  1. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    OpenAIRE

    Jovanović Filip P.; Berić Ivana M.; Jovanović Petar M.; Jovanović Aca D.

    2016-01-01

    This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reductio...

  2. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    Directory of Open Access Journals (Sweden)

    Jovanović Filip P.

    2016-01-01

    Full Text Available This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reduction of the quantity of coke, whose production requires large amounts of energy, reduction of harmful exhaust emission and increase productivity of blast furnaces through the reduction of production costs. The project was complex and had high costs, so that it was necessary to predict risk events and plan responses to identified risks at an early stage of implementation, in the course of the project design, in order to minimise losses and implement the project in accordance with the defined time and cost limitations. [Projekat Ministarstva nauke Republike Srbije, br. 179081: Researching contemporary tendencies of strategic management using specialized management disciplines in function of competitiveness of Serbian economy

  3. Coal refuse reclamation project

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.

    1979-04-06

    A 13.8 ha abandoned coal refuse site in southwestern Illinois was reclaimed by recontouring the refuse material and covering it with a minimum 30 cm of soil. The reclamation procedure included determination of the site's final land use, collection of preconstruction environmental data, and development and implementation of engineering plans. The project is demonstrating methods that can be used to reclaim abandoned coal refuse sites, and a multidisciplinary approach is being used to evaluate postconstruction environmental and economic effects of the reclamation effort. Surface water quality has shown significant improvement and plant cover is becoming established on the site. Soil microbial populations are developing and wildlife habitats are forming. The economic value of the site and adjacent properties has increased substantially and the area's aesthetic value has been enhanced. This project is providing valuable design data for future reclamation efforts of this type.

  4. EIA projections of coal supply and demand

    International Nuclear Information System (INIS)

    Klein, D.E.

    1989-01-01

    Contents of this report include: EIA projections of coal supply and demand which covers forecasted coal supply and transportation, forecasted coal demand by consuming sector, and forecasted coal demand by the electric utility sector; and policy discussion

  5. Clean Coal Diesel Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Robert Wilson

    2006-10-31

    A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

  6. An update on blast furnace granular coal injection

    Energy Technology Data Exchange (ETDEWEB)

    Hill, D.G. [Bethlehem Steel Corp., Burns Harbor, IN (United States); Strayer, T.J.; Bouman, R.W. [Bethlehem Steel Corp., PA (United States)

    1997-12-31

    A blast furnace coal injection system has been constructed and is being used on the furnace at the Burns Harbor Division of Bethlehem Steel. The injection system was designed to deliver both granular (coarse) and pulverized (fine) coal. Construction was completed on schedule in early 1995. Coal injection rates on the two Burns Harbor furnaces were increased throughout 1995 and was over 200 lbs/ton on C furnace in September. The injection rate on C furnace reached 270 lbs/ton by mid-1996. A comparison of high volatile and low volatile coals as injectants shows that low volatile coal replaces more coke and results in a better blast furnace operation. The replacement ratio with low volatile coal is 0.96 lbs coke per pound of coal. A major conclusion of the work to date is that granular coal injection performs very well in large blast furnaces. Future testing will include a processed sub-bituminous coal, a high ash coal and a direct comparison of granular versus pulverized coal injection.

  7. The NOXSO clean coal project

    Energy Technology Data Exchange (ETDEWEB)

    Black, J.B.; Woods, M.C.; Friedrich, J.J.; Browning, J.P. [NOXSO Corp., Bethel Park, PA (United States)

    1997-12-31

    The NOXSO Clean Coal Project will consist of designing, constructing, and operating a commercial-scale flue-gas cleanup system utilizing the NOXSO Process. The process is a waste-free, dry, post-combustion flue-gas treatment technology which uses a regenerable sorbent to simultaneously adsorb sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) from flue gas from coal-fired boilers. The NOXSO plant will be constructed at Alcoa Generating Corporation`s (AGC) Warrick Power Plant near Evansville, Indiana and will treat all the flue gas from the 150-MW Unit 2 boiler. The NOXSO plant is being designed to remove 98% of the SO{sub 2} and 75% of the NO{sub x} when the boiler is fired with 3.4 weight percent sulfur, southern-Indiana coal. The NOXSO plant by-product will be elemental sulfur. The elemental sulfur will be shipped to Olin Corporation`s Charleston, Tennessee facility for additional processing. As part of the project, a liquid SO{sub 2} plant has been constructed at this facility to convert the sulfur into liquid SO{sub 2}. The project utilizes a unique burn-in-oxygen process in which the elemental sulfur is oxidized to SO{sub 2} in a stream of compressed oxygen. The SO{sub 2} vapor will then be cooled and condensed. The burn-in-oxygen process is simpler and more environmentally friendly than conventional technologies. The liquid SO{sub 2} plant produces 99.99% pure SO{sub 2} for use at Olin`s facilities. The $82.8 million project is co-funded by the US Department of Energy (DOE) under Round III of the Clean Coal Technology program. The DOE manages the project through the Pittsburgh Energy Technology Center (PETC).

  8. Temperature field distribution of coal seam in heat injection

    OpenAIRE

    Zhang Zhizhen; Peng Weihong; Shang Xiaoji; Wang Kun; Li Heng; Ma Wenming

    2017-01-01

    In this article, we present a natural boundary element method (NBEM) to solve the steady heat flow problem with heat sources in a coal seam. The boundary integral equation is derived to obtain the temperature filed distribution of the coal seam under the different injecting conditions.

  9. Brayton Point coal conversion project (NEPCO)

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, W.F. Jr.

    1982-05-01

    The New England Power Company (NEPCO) recently converted Brayton Point Power Station Units 1, 2, and 3 from oil to coal. The coal conversion project is the largest coal conversion project in the nation to date. Stone and Webster Engineering Corporation (SWEC) was hired as the engineer/constructor for the project. Units 1 and 2 are 250-MW Combustion Engineering boilers, and Unit 3 is a 650-MW Babcock and Wilcox boiler. All three units were originally designed to burn pulverized coal but were converted to oil during the years of low oil prices. Studies performed by NEPCO and SWEC indicated that the areas discussed in the following paragraphs required upgrading before the units could efficiently burn coal and meet Federal and State environmental requirements. All units have been converted and are operating. This paper discusses design modifications required to burn coal, startup, and initial operating problems, and solutions.

  10. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  11. Healy Clean Coal Project: A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2003-09-01

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) Program is to provide the energy marketplace with advanced, more efficient, and environmentally responsible coal utilization options by conducting demonstrations of new technologies. These demonstration projects are intended to establish the commercial feasibility of promising advanced coal technologies that have been developed to a level at which they are ready for demonstration testing under commercial conditions. This document serves as a DOE post-project assessment (PPA) of the Healy Clean Coal Project (HCCP), selected under Round III of the CCT Program, and described in a Report to Congress (U.S. Department of Energy, 1991). The desire to demonstrate an innovative power plant that integrates an advanced slagging combustor, a heat recovery system, and both high- and low-temperature emissions control processes prompted the Alaska Industrial Development and Export Authority (AIDEA) to submit a proposal for this project. In April 1991, AIDEA entered into a cooperative agreement with DOE to conduct this project. Other team members included Golden Valley Electric Association (GVEA), host and operator; Usibelli Coal Mine, Inc., coal supplier; TRW, Inc., Space & Technology Division, combustor technology provider; Stone & Webster Engineering Corp. (S&W), engineer; Babcock & Wilcox Company (which acquired the assets of Joy Environmental Technologies, Inc.), supplier of the spray dryer absorber technology; and Steigers Corporation, provider of environmental and permitting support. Foster Wheeler Energy Corporation supplied the boiler. GVEA provided oversight of the design and provided operators during demonstration testing. The project was sited adjacent to GVEA's Healy Unit No. 1 in Healy, Alaska. The objective of this CCT project was to demonstrate the ability of the TRW Clean Coal Combustion System to operate on a blend of run-of-mine (ROM) coal and waste coal, while meeting strict

  12. Taipower - latest projects to boost coal import levels

    Energy Technology Data Exchange (ETDEWEB)

    Hargreaves, D

    1985-05-01

    The activities are reviewd for Taipower, the state enterprise electrical power utility for Taiwan RC: its generating facilities and comparability; the status of major projects, especially the Taichung thermal project; the status of coal; coal burn performance; air pollution controls; coal ash performance; coal imports; transport logistics; including terminal facilities at the Taichung thermal power plant.

  13. The Healy clean coal project: An overview

    Energy Technology Data Exchange (ETDEWEB)

    Olson, J.B.; McCrohan, D.V. [Alaska Industrial Development and Export Authority, Anchorage, AK (United States)

    1997-12-31

    The Healy Clean Coal Project, selected by the US Department of Energy under Round III of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is scheduled to be completed in August of 1997, with startup activity concluding in December of 1997. Demonstration, testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of NOx, SO{sub 2} and particulates from this 50 megawatt plant are expected to be significantly lower than current standards. The project status, its participants, a description of the technology to be demonstrated, and the operational and performance goals of this project are presented.

  14. An injection technique for in-situ remediation of abandoned underground coal mines

    International Nuclear Information System (INIS)

    Canty, G.A.; Everett, J.W.

    1998-01-01

    Remediation of underground mines can prove to be a difficult task, given the physical constraints associated with introducing amendments to a subterranean environment. An acid mine abatement project involving in-situ chemical treatment method was conducted by the University of Oklahoma. The treatment method involved the injection of an alkaline coal combustion by-product (CCB) slurry into a flooded mine void (pH 4.4) to create a buffered zone. Injection of the CCB slurry was possible through the use of equipment developed by the petroleum industry for grouting recovery wells. This technology was selected because the CCB slurry could be injected under significant pressure and at a high rate. With higher pressure and rates of injection, a large quantity of slurry can be introduced into the mine within a limited amount of time. Theoretically, the high pressure and rate would improve dispersal of the slurry within the void. In addition, the high pressure is advantageous in fracturing or breaking-down obstructions to injection. During the injection process, a total of 418 tons of CCB was introduced within 15 hours. The mine did not refuse any of the material, and it is likely that a much larger mass could have been added. One injection well was drilled into a pillar of coal. Normally this would pose a problem when introducing a slurry; however, the coal pillar was easily fractured during the injection process. Currently, the pH of the mine discharge is above 6.5 and the alkalinity is approximately 100 mg/L as CACO 3

  15. Computational Fluid Dynamics (CFD) Modeling for High Rate Pulverized Coal Injection (PCI) to Blast Furnaces

    International Nuclear Information System (INIS)

    Zhou, Chenn

    2008-01-01

    Pulverized coal injection (PCI) into the blast furnace (BF) has been recognized as an effective way to decrease the coke and total energy consumption along with minimization of environmental impacts. However, increasing the amount of coal injected into the BF is currently limited by the lack of knowledge of some issues related to the process. It is therefore important to understand the complex physical and chemical phenomena in the PCI process. Due to the difficulty in attaining trus BF measurements, Computational fluid dynamics (CFD) modeling has been identified as a useful technology to provide such knowledge. CFD simulation is powerful for providing detailed information on flow properties and performing parametric studies for process design and optimization. In this project, comprehensive 3-D CFD models have been developed to simulate the PCI process under actual furnace conditions. These models provide raceway size and flow property distributions. The results have provided guidance for optimizing the PCI process

  16. HIGH PRESSURE COAL COMBUSTON KINETICS PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Stefano Orsino

    2005-03-30

    As part of the U.S. Department of Energy (DoE) initiative to improve the efficiency of coal-fired power plants and reduce the pollution generated by these facilities, DOE has funded the High-Pressure Coal Combustion Kinetics (HPCCK) Projects. A series of laboratory experiments were conducted on selected pulverized coals at elevated pressures with the specific goals to provide new data for pressurized coal combustion that will help extend to high pressure and validate models for burnout, pollutant formation, and generate samples of solid combustion products for analyses to fill crucial gaps in knowledge of char morphology and fly ash formation. Two series of high-pressure coal combustion experiments were performed using SRI's pressurized radiant coal flow reactor. The first series of tests characterized the near burner flame zone (NBFZ). Three coals were tested, two high volatile bituminous (Pittsburgh No.8 and Illinois No.6), and one sub-bituminous (Powder River Basin), at pressures of 1, 2, and 3 MPa (10, 20, and 30 atm). The second series of experiments, which covered high-pressure burnout (HPBO) conditions, utilized a range of substantially longer combustion residence times to produce char burnout levels from 50% to 100%. The same three coals were tested at 1, 2, and 3 MPa, as well as at 0.2 MPa. Tests were also conducted on Pittsburgh No.8 coal in CO2 entrainment gas at 0.2, 1, and 2 MPa to begin establishing a database of experiments relevant to carbon sequestration techniques. The HPBO test series included use of an impactor-type particle sampler to measure the particle size distribution of fly ash produced under complete burnout conditions. The collected data have been interpreted with the help of CFD and detailed kinetics simulation to extend and validate devolatilization, char combustion and pollutant model at elevated pressure. A global NOX production sub-model has been proposed. The submodel reproduces the performance of the detailed chemical

  17. Clean Coal Technology Programs: Completed Projects (Volume 2)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  18. Microbial transformation of coal and coal relevant structures - presentation of a BMBF joint research project

    Energy Technology Data Exchange (ETDEWEB)

    Sinder, C.; Schacht, S.; Pfeifer, F.; Klein, J. [DMT-Gesellschaft fuer Forschung und Pruefung mbH, Essen (Germany)

    1997-12-31

    Investigations in the joint research project `Microbial transformation of coal and coal relevant structures` supported by the Ministry of Education, Science, Research and Technology (BMBF) of the Federal Republic of Germany and coordinated by the DMT-Gesellschaft fuer Forschung und Pruefung mbH (DMT) are focussed on research and development of biotechnological coal conversion processes. Up to now investigations carried out in the project lead to a number of important results. During work on the project a great number of different microorganisms was found able to degrade or solubilize coal or lignite. Enzymatic as well as regulation mechanisms of the microbial depolymerization processes have been characterized successfully. (orig.)

  19. Case study on ground surface deformation induced by CO2 injection into coal seam

    International Nuclear Information System (INIS)

    Li Hong; Tang Chun'an

    2010-01-01

    To monitor a geomechanical response of injecting CO 2 into relatively shallow coal seams, tiltmeters were set as an array to cover the ground surface area surrounding the injection well, and to measure the ground deformation during a well fracturing stimulation and a short-term CO 2 injection test. In this paper, an attempt to establish a quantitative relationship between the in-situ coal swelling and the corresponding ground deformation was made by means of numerical simulation study. (authors)

  20. NuCoal CTL wood mountain project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-09-15

    The province of Saskatchewan experienced significant growth between 2005 and 2008. The growing economy included an abundance of different commodities and made Saskatchewan the newest hub for the latest technologies and investment. This report outlined the various opportunities in Saskatchewan for a coal to liquids plant and its technologies. The coal from southern Saskatchewan is generally lignite, which is found in the Ravenscrag Formation near the Big Muddy Badlands. The report discussed the Ravenscrag Formation as well as mining activity that was largely concentrated near Estevan and Bienfait in southeastern Saskatchewan, where Sherritt International operated two surface mines. The Coronach Poplar River Power Station, located 10 kilometres north of the Canada-United States border in southern Saskatchewan was also discussed. Population density, labour, land use, First Nations, and proximity to major centres were factors that were discussed. The programs that were identified included the Saskatchewan immigrant nominee program, an alternative program to the Canadian federal immigration program for those who want to come to Saskatchewan as a permanent resident of Canada; the Weyburn-Midale carbon dioxide project, the world's first carbon dioxide measuring, monitoring and verification initiative; and the Federated Co-op in Regina, a 100,000 barrel/day refinery located close to the Coronach area in Saskatchewan. Political climate, access to the electrical grid, access to water, access to major pipelines, access to rail lines, and access to highways were other topics that were presented. It was concluded that southern Saskatchewan had a broad range of opportunities for a coal to liquids plant. The area has numerous advantages including access to rail and pipelines. refs., tabs., figs., appendices.

  1. Thermal analysis evaluation of the reactivity of coal mixtures for injection in the blast furnace

    Directory of Open Access Journals (Sweden)

    Maria de Lourdes Ilha Gomes

    2006-03-01

    Full Text Available Pulverized Coal Injection (PCI is an important standard technology replacing coke partially by pulverized coal into the blast furnace that allows a significant reduction of hot metal costs and environmental impact, contributing to a decrease of coke requirements for ironmaking. Coals typically used in this process in Brazil are, at current time, exclusively imported from many countries, although economic important coal-measures occur in the southern part of the country. The Brazilian coals have a low rank, higher contents of inert components, proportioning nocoking properties and an expected high reactivity. Due to these caractheristics, these coals could be used for injection in the blast furnaces in order to decrease the dependency on high cost imported coals. The efficiency in the combustion and the coal reactivity are considered important parameters in the blast furnace, since a larger amount of char (unburned coal causes severe problems to the furnace operation. The aim of the present work is to compare the reactivity of a south Brazilian coal, obtained from Faxinal mine, with two imported coals and the blends of the Brazilian coal with the imported ones. The reactivity of these coals and their blends were evaluated in a thermogravimetric analyzer. In the experiments, various mass ratios of Faxinal coal and the imported coals were used to compose the blends. The gasification reaction with pure CO2 was conducted under isothermal conditions at 1050 °C and atmospheric pressure. The experimental results show the greater reactivity of the Faxinal coal. The additive behavior was confirmed. The blends with a composition of up to 50% Faxinal coal have parameters according to the usual limits used for PCI.

  2. Coal char combustion under a CO{sub 2}-rich atmosphere: Implications for pulverized coal injection in a blast furnace

    Energy Technology Data Exchange (ETDEWEB)

    Borrego, A.G.; Casal, M.D. [Instituto Nacional del Carbon, CSIC. P.O. Box 73, 33080 Oviedo (Spain); Osorio, E.; Vilela, A.C.F. [Laboratorio de Siderurgia, DEMET/PPGEM - Universidade Federal do Rio Grande do Sul. P.O. Box 15021, 91501-970 Porto Alegre (Brazil)

    2008-11-15

    Pulverized coal injection (PCI) is employed in blast furnace tuyeres attempting to maximize the injection rate without increasing the amount of unburned char inside the stack of the blast furnace. When coal is injected with air through the injection lance, the resolidified char will burn in an atmosphere with a progressively lower oxygen content and higher CO{sub 2} concentration. In this study an experimental approach was followed to separate the combustion process into two distinct devolatilization and combustion steps. Initially coal was injected into a drop tube furnace (DTF) operating at 1300 C in an atmosphere with a low oxygen concentration to ensure the combustion of volatiles and prevent the formation of soot. Then the char was refired into the DTF at the same temperature under two different atmospheres O{sub 2}/N{sub 2} (typical combustion) and O{sub 2}/CO{sub 2} (oxy-combustion) with the same oxygen concentration. Coal injection was also performed under a higher oxygen concentration in atmospheres typical for both combustion and oxy-combustion. The fuels tested comprised a petroleum coke and coals currently used for PCI injection ranging from high volatile to low volatile bituminous rank. Thermogravimetric analyses and microscopy techniques were used to establish the reactivity and appearance of the chars. Overall similar burnouts were achieved with N{sub 2} and CO{sub 2} for similar oxygen concentrations and therefore no loss in burnout should be expected as a result of enrichment in CO{sub 2} in the blast furnace gas. The advantage of increasing the amount of oxygen in a reacting atmosphere during burnout was found to be greater, the higher the rank of the coal. (author)

  3. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  4. Massive injection of coal and superoxygenated blast into the blast furnace

    Energy Technology Data Exchange (ETDEWEB)

    Toxopeus, H.L.; Danloy, G.; Franssen, R.; Havelange, O. [Corus, IJmuiden (Netherlands)

    2002-07-01

    The aim of the present project was to demonstrate the industrial feasibility of a massive injection of coal, {+-}270 kg/tHM, combined with a high O{sub 2} enrichment of the blast. The coke rate would thus be reduced to well below 250 kg/tHM. A reference level of 200-220 kg coal/tHM was successfully accomplished. However, the technical condition of the blast furnace hearths overruled all ambitions, the anticipated trial scheme had to be abandoned and no further trials were performed. A very short trial was aborted shortly after reaching an injection level of around 265 coal/tHM, due to excessive generation of very fine sludge originating from incomplete combustion. This forced the operators to investigate the merits of combustion more in depth. At the aimed low coke-rate detailed information about the gas distribution is of utmost importance. Therefore, in conjunction with the industrial tests, CRM designed a gas tracing method. Measurement of the transfer time between the injection point (a tuyere) and the sampling points (on an above-burden probe) would allow deduction of the radial gas distribution. CRM made the design and the start-up of an installation built by Hoogovens on blast furnace 7 of IJmuiden. Since then, repeated measurements have shown that the gas transfer time profiles are consistent with the data measured at the blast furnace top and at the wall. The modifications of the moveable armour position are reflected better and faster on the gas distribution as measured by helium tracing than on the skin flow temperatures.

  5. Injection of alkaline ashes into underground coal mines for acid mine drainage abatement

    International Nuclear Information System (INIS)

    Aljoe, W.W.

    1996-01-01

    The injection of alkaline coal combustion waste products into abandoned underground coal mines for acid mine drainage (AMD) abatement has obvious conceptual appeal. This paper summarizes the findings of the baseline hydrogeologic and water quality evaluations at two sites--one in West Virginia and one in Maryland--where field demonstrations of the technique are being pursued in cooperative efforts among State and Federal agencies and/or private companies. The West Virginia site produces severe AMD from three to seven AMD sources that are spaced over about a 1.2 km stretch of the down-dip side of the mine workings. By completely filling the most problematic portion of the mine workings with coal combustion ashes, the State expects that the costs and problems associated with AMD treatment will be greatly reduced. At the Maryland site, it is expected that the AMD from a relatively small target mine will be eliminated completely by filling the entire mine void with a grout composed of a mixture of fly ash, fluidized-bed combustion ash, and flue gas desulfurization sludge. This project will also demonstrate the potential cost-effectiveness of the technique at other sites, both for the purpose of AMD remediation and control of land subsidence

  6. Lance for injecting highly-loaded coal slurries into the blast furnace

    Energy Technology Data Exchange (ETDEWEB)

    Illuminati, D.

    1991-10-29

    A lance is used to inject fuel oil into a blast furnace. This simple design permits conversion of coal water and coal tar slurries to a fine mist at very low flow rates. This design prevents the build-up of deposits which increases service life and steadies the flow rate.

  7. Abstracts and research accomplishments of university coal research projects

    International Nuclear Information System (INIS)

    1991-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their projects in time for distribution at a grantees conference. This book is a compilation of the material received in response to the request. Abstracts discuss the following area: coal science, coal surface science, reaction chemistry, advanced process concepts, engineering fundamentals and thermodynamics, environmental science

  8. Abstracts and research accomplishments of university coal research projects

    Energy Technology Data Exchange (ETDEWEB)

    1991-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their projects in time for distribution at a grantees conference. This book is a compilation of the material received in response to the request. Abstracts discuss the following area: coal science, coal surface science, reaction chemistry, advanced process concepts, engineering fundamentals and thermodynamics, environmental science.

  9. Enchancing the use of coal by gas reburning and sorben injection

    International Nuclear Information System (INIS)

    Keen, R.T.; Hong, C.C.; Opatrny, J.C.; Sommer, T.M.; Folsom, B.A.; Payne, R.; Ritz, H.J.; Pratapas, J.M.; May, T.J.; Krueger, M.S.

    1993-01-01

    The Gas Reburning-Sorbent Injection (GR-SI) Process was demonstrated on a 71 MWe net tangentially fired boiler at Hennepin, Illinois, and is being demonstrated on a 33 MWe net cyclone-fired boiler at Springfield, Illinois as a Clean Coal Technology Round I demonstration project. The Hennepin demonstration was completed after more than 2,000 hours of successful operation. In long-term demonstration testing at a Ca/S molar ratio of 1.75 an 19 percent gas heat input, 53 percent SO 2 reduction and 67 percent NO x reduction were achieved without any adverse impacts on boiler performance or electrostatic precipitator performance with flue gas humidification. These achievements exceeded the project goals of 50 and 60 percent, respectively. The CO 2 reduction due to the use of 18 percent natural gas was 8 percent

  10. Carbon burnout project-coal fineness effects

    Energy Technology Data Exchange (ETDEWEB)

    Mike Celechin [Powergen UK plc, Nottingham (United Kingdom)

    2004-02-01

    The aim of this DTI project is to establish good quality plant and rig data to demonstrate the effect of changing coal fineness on carbon burnout in a controlled manner, which can then be used to support computational fluid dynamics (CFD) and engineering models of the process. The modelling elements of the project were completed by Mitsui Babcock Energy Ltd., and validated using the data produced by the other partners. The full scale plant trials were successfully completed at Powergen's Kingsnorth Power Station and a full set of tests were also completed on Powergen's CTF. During these test both carbon-in-ash and NOx levels were seen to increase with increasing fuel particle size. Laboratory analysis of fly ash produced during the plant and rig trials revealed that only small differences in char morphology and reactivity could be detected in samples produced under significantly different operating conditions. Thermo Gravimetric Analysis was also undertaken on a range of PF size fractions collected form mills operating at different conditions. 3 refs., 13 figs., 1 tab.

  11. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  12. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  13. Grace announces coal-to-methanol project

    Energy Technology Data Exchange (ETDEWEB)

    Myers, R

    1980-02-15

    WR Grace and Co. are planning a feasibility study for a plant to produce 5000 tons/day of methanol and 6000 tons/day of carbon dioxide from captive coal reserves in Colorado. The study will be performed by Energy Transition Co. (ETCo). The producers would be used for pipeline transmission of pulverised coal, probably to California. At the destination the coal would go to a power station, the methanol to a gas turbine and the carbon dioxide to an oil producer for tertiary recovery.

  14. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW`s Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  15. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW's Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  16. Three-dimensional simulation of flow and combustion for pulverised coal injection

    Energy Technology Data Exchange (ETDEWEB)

    Guo, B.Y.; Zulli, P.; Rogers, H.; Mathieson, J.G.; Yu, A.B. [BlueScope Steel Research, Port Kembla, NSW (Australia)

    2005-07-01

    A three-dimensional numerical model of pulverised coal injection has been developed for simulating coal flow and combustion in the tuyere and raceway of a blast furnace. The model has been used to simulate previously reported combustion tests, which feature an inclined co-axial lance with an annular cooling gas. The predicted coal burnout agrees well with that measured for three coals with volatile contents and particle size ranging between 20.2-36.4% and particle sizes 1-200 {mu}m. Many important phenomena including flow asymmetry, recirculating flow and particle dispersion in the combustion chamber have been predicted. The current model can reproduce the experimental observations including the effects on burnout of coal flowrate and the introduction of methane for lance cooling.

  17. Injection of FGD Grout to Abate Acid Mine Drainage in Underground Coal Mines

    Energy Technology Data Exchange (ETDEWEB)

    Mafi, S.; Damian, M.T.; Senita, R.E.; Jewitt, W.C.; Bair, S.; Chin, Y.C.; Whitlatch, E.; Traina, S.; Wolfe, W.

    1997-07-01

    Acid Mine Drainage (AMD) from abandoned underground coal mines in Ohio is a concern for both residents and regulatory agencies. Effluent from these mines is typically characterized by low pH and high iron and sulfate concentrations and may contaminate local drinking-water supplies and streams. The objective of this project is to demonstrate the technical feasibility of injecting cementitious alkaline materials, such as Flue Gas Desulfurization (FGD) material to mitigate current adverse environmental impacts associated with AMD in a small, abandoned deep mine in Coshocton County Ohio. The Flue Gas Desulfurization material will be provided from American Electric Power`s (AEP) Conesville Plant. It will be injected as a grout mix that will use Fixated Flue Gas Desulfurization material and water. The subject site for this study is located on the border of Coshocton and Muskingum Counties, Ohio, approximately 1.5 miles south-southwest of the town of Wills Creek. The study will be performed at an underground mine designated as Mm-127 in the Ohio Department of Natural Resources register, also known as the Roberts-Dawson Mine. The mine operated in the mid-1950s, during which approximately 2 million cubic feet of coal was removed. Effluent discharging from the abandoned mine entrances has low pH in the range of 2.8-3.0 that drains directly into Wills Creek Lake. The mine covers approximately 14.6 acres. It is estimated that 26,000 tons of FGD material will be provided from AEP`s Conesville Power Plant located approximately 3 miles northwest of the subject site.

  18. Injection of FGD Grout to Abate Acid Mine Drainage in Underground Coal Mines

    International Nuclear Information System (INIS)

    Mafi, S.; Damian, M.T.; Senita, R.E.; Jewitt, W.C.; Bair, S.; Chin, Y.C.; Whitlatch, E.; Traina, S.; Wolfe, W.

    1997-07-01

    Acid Mine Drainage (AMD) from abandoned underground coal mines in Ohio is a concern for both residents and regulatory agencies. Effluent from these mines is typically characterized by low pH and high iron and sulfate concentrations and may contaminate local drinking-water supplies and streams. The objective of this project is to demonstrate the technical feasibility of injecting cementitious alkaline materials, such as Flue Gas Desulfurization (FGD) material to mitigate current adverse environmental impacts associated with AMD in a small, abandoned deep mine in Coshocton County Ohio. The Flue Gas Desulfurization material will be provided from American Electric Power's (AEP) Conesville Plant. It will be injected as a grout mix that will use Fixated Flue Gas Desulfurization material and water. The subject site for this study is located on the border of Coshocton and Muskingum Counties, Ohio, approximately 1.5 miles south-southwest of the town of Wills Creek. The study will be performed at an underground mine designated as Mm-127 in the Ohio Department of Natural Resources register, also known as the Roberts-Dawson Mine. The mine operated in the mid-1950s, during which approximately 2 million cubic feet of coal was removed. Effluent discharging from the abandoned mine entrances has low pH in the range of 2.8-3.0 that drains directly into Wills Creek Lake. The mine covers approximately 14.6 acres. It is estimated that 26,000 tons of FGD material will be provided from AEP's Conesville Power Plant located approximately 3 miles northwest of the subject site

  19. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  20. Control of spontaneous combustion of coal in goaf at high geotemperatureby injecting liquid carbon dioxide: inertand cooling characteristics of coal

    Science.gov (United States)

    Liu, Zhenling; Wen, Hu; Yu, Zhijin; Wang, Chao; Ma, Li

    2018-02-01

    The spontaneous combustion of coal in goaf at high geo temperatures is threatening safety production in coalmine. The TG-DSC is employed to study the variation of mass and energy at 4 atmospheres (mixed gases of N2, O2 and CO2) and heating rates (10°C/min) during oxidation of coal samples. The apparent activation energy and pre-exponential factor of coal oxidation decrease rapidly with increasing theCO2 concentration. Furthermore, its reaction rate is slow, its heat released reduces. Based on the conditions of 1301 face in the Longgucoalmine, a three-dimensional geometry model is developed to simulate the distributions stream field and temperature field and the variation characteristics ofCO2 concentration field after injecting liquidCO2. The results indicate that oxygen reached to depths of˜120m in goaf, 100m in the side of inlet air, and 10m in the side of outlet air before injecting liquidCO2. After injecting liquidCO2for 28.8min, the width of oxidation and heat accumulation zone is shortened by 20m, and the distance is 80m in the side of working face and 40˜60m in goafin the direction of dip affected by temperature.

  1. The ENCOAL Mild Coal Gasification Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2002-03-15

    This report is a post-project assessment of the ENCOAL{reg_sign} Mild Coal Gasification Project, which was selected under Round III of the U.S. Department of Energy (DOE) Clean Coal Technology (CCT) Demonstration Program. The CCT Demonstration Program is a government and industry cofunded technology development effort to demonstrate a new generation of innovative coal utilization processes in a series of commercial-scale facilities. The ENCOAL{reg_sign} Corporation, a wholly-owned subsidiary of Bluegrass Coal Development Company (formerly SMC Mining Company), which is a subsidiary of Ziegler Coal Holding Company, submitted an application to the DOE in August 1989, soliciting joint funding of the project in the third round of the CCT Program. The project was selected by DOE in December 1989, and the Cooperative Agreement (CA) was approved in September 1990. Construction, commissioning, and start-up of the ENCOAL{reg_sign} mild coal gasification facility was completed in June 1992. In October 1994, ENCOAL{reg_sign} was granted a two-year extension of the CA with the DOE, that carried through to September 17, 1996. ENCOAL{reg_sign} was then granted a six-month, no-cost extension through March 17, 1997. Overall, DOE provided 50 percent of the total project cost of $90,664,000. ENCOAL{reg_sign} operated the 1,000-ton-per-day mild gasification demonstration plant at Triton Coal Company's Buckskin Mine near Gillette, Wyoming, for over four years. The process, using Liquids From Coal (LFC{trademark}) technology originally developed by SMC Mining Company and SGI International, utilizes low-sulfur Powder River Basin (PRB) coal to produce two new fuels, Process-Derived Fuel (PDF{trademark}) and Coal-Derived Liquids (CDL{trademark}). The products, as alternative fuel sources, are capable of significantly lowering current sulfur emissions at industrial and utility boiler sites throughout the nation thus reducing pollutants causing acid rain. In support of this overall

  2. The ENCOAL Mild Coal Gasification Project, A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    This report is a post-project assessment of the ENCOAL(reg s ign) Mild Coal Gasification Project, which was selected under Round III of the U.S. Department of Energy (DOE) Clean Coal Technology (CCT) Demonstration Program. The CCT Demonstration Program is a government and industry cofunded technology development effort to demonstrate a new generation of innovative coal utilization processes in a series of commercial-scale facilities. The ENCOAL(reg s ign) Corporation, a wholly-owned subsidiary of Bluegrass Coal Development Company (formerly SMC Mining Company), which is a subsidiary of Ziegler Coal Holding Company, submitted an application to the DOE in August 1989, soliciting joint funding of the project in the third round of the CCT Program. The project was selected by DOE in December 1989, and the Cooperative Agreement (CA) was approved in September 1990. Construction, commissioning, and start-up of the ENCOAL(reg s ign) mild coal gasification facility was completed in June 1992. In October 1994, ENCOAL(reg s ign) was granted a two-year extension of the CA with the DOE, that carried through to September 17, 1996. ENCOAL(reg s ign) was then granted a six-month, no-cost extension through March 17, 1997. Overall, DOE provided 50 percent of the total project cost of$90,664,000. ENCOAL(reg s ign) operated the 1,000-ton-per-day mild gasification demonstration plant at Triton Coal Company's Buckskin Mine near Gillette, Wyoming, for over four years. The process, using Liquids From Coal (LFC(trademark)) technology originally developed by SMC Mining Company and SGI International, utilizes low-sulfur Powder River Basin (PRB) coal to produce two new fuels, Process-Derived Fuel (PDF(trademark)) and Coal-Derived Liquids (CDL(trademark)). The products, as alternative fuel sources, are capable of significantly lowering current sulfur emissions at industrial and utility boiler sites throughout the nation thus reducing pollutants causing acid rain. In support of this overall

  3. Abstract and research accomplishments of University Coal Research Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their respective projects in time for distribution at a conference on June 13--14, 1995 at Tennessee State University in Nashville, Tennessee. This book is a compilation of the material received in response to that request. For convenience, the 70 grants reported in this book are stored into eight technical areas, Coal Science, Coal Surface Science, Reaction Chemistry, Advanced Process Concepts, Engineering Fundamentals and Thermodynamics, Environmental Science, high Temperature Phenomena, and Special topics. Indexes are provided for locating projects by subject, principal investigators, and contracting organizations. Each extended abstract describes project objectives, work accomplished, significance to the Fossil Energy Program, and plans for the next year.

  4. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  5. Sorbent Injection for Small ESP Mercury Control in Low Sulfur Eastern Bituminous Coal Flue Gas

    Energy Technology Data Exchange (ETDEWEB)

    Carl Richardson; Katherine Dombrowski; Douglas Orr

    2006-12-31

    This project Final Report is submitted to the U.S. Department of Energy (DOE) as part of Cooperative Agreement DE-FC26-03NT41987, 'Sorbent Injection for Small ESP Mercury Control in Low Sulfur Eastern Bituminous Coal Flue Gas.' Sorbent injection technology is targeted as the primary mercury control process on plants burning low/medium sulfur bituminous coals equipped with ESP and ESP/FGD systems. About 70% of the ESPs used in the utility industry have SCAs less than 300 ft2/1000 acfm. Prior to this test program, previous sorbent injection tests had focused on large-SCA ESPs. This DOE-NETL program was designed to generate data to evaluate the performance and economic feasibility of sorbent injection for mercury control at power plants that fire bituminous coal and are configured with small-sized electrostatic precipitators and/or an ESP-flue gas desulfurization (FGD) configuration. EPRI and Southern Company were co-funders for the test program. Southern Company and Reliant Energy provided host sites for testing and technical input to the project. URS Group was the prime contractor to NETL. ADA-ES and Apogee Scientific Inc. were sub-contractors to URS and was responsible for all aspects of the sorbent injection systems design, installation and operation at the different host sites. Full-scale sorbent injection for mercury control was evaluated at three sites: Georgia Power's Plant Yates Units 1 and 2 [Georgia Power is a subsidiary of the Southern Company] and Reliant Energy's Shawville Unit 3. Georgia Power's Plant Yates Unit 1 has an existing small-SCA cold-side ESP followed by a Chiyoda CT-121 wet scrubber. Yates Unit 2 is also equipped with a small-SCA ESP and a dual flue gas conditioning system. Unit 2 has no SO2 control system. Shawville Unit 3 is equipped with two small-SCA cold-side ESPs operated in series. All ESP systems tested in this program had SCAs less than 250 ft2/1000 acfm. Short-term parametric tests were conducted on Yates

  6. DEMONSTRATION OF SORBENT INJECTION TECHNOLOGY ON A TANGENTIALLY COAL-FIRED UTILITY BOILER (YORKTOWN LIMB DEMONSTRATION)

    Science.gov (United States)

    The report summarizes activities conducted and results achieved in an EPA-sponsored program to demonstrate Limestone Injection Multistage Burner (LIMB) technology on a tangentially fired coal-burning utility boiler, Virginia Power's 180-MWe Yorktown Unit No. 2. his successfully d...

  7. Wabash River Coal Gasification Combined Cycle Repowering Project: Clean Coal Technology Program

    International Nuclear Information System (INIS)

    1993-05-01

    The proposed project would result in a combined-cycle power plant with lower emissions and higher efficiency than most existing coal-fired power plants of comparable size. The net plant heat rate (energy content of the fuel input per useable electrical generation output; i.e., Btu/kilowatt hour) for the new repowered unit would be a 21% improvement over the existing unit, while reducing SO 2 emissions by greater than 90% and limiting NO x emissions by greater than 85% over that produced by conventional coal-fired boilers. The technology, which relies on gasified coal, is capable of producing as much as 25% more electricity from a given amount of coal than today's conventional coal-burning methods. Besides having the positive environmental benefit of producing less pollutants per unit of power generated, the higher overall efficiency of the proposed CGCC project encourages greater utilization to meet base load requirements in order to realize the associated economic benefits. This greater utilization (i.e., increased capacity factor) of a cleaner operating plant has global environmental benefits in that it is likely that such power would replace power currently being produced by less efficient plants emitting a greater volume of pollutants per unit of power generated

  8. Impact of thermal processes on CO2 injectivity into a coal seam

    International Nuclear Information System (INIS)

    Qu, H Y; Liu, J S; Pan, Z J; Connell, L

    2010-01-01

    The objective of this study is to investigate how thermal gradients, caused by CO2 injection, expansion and adsorption, affect the permeability and adsorption capacity of coal during CO2 sequestration. A new permeability model is developed in which the concept of elastic modulus reduction ratio is introduced to partition the effective strain between coal matrix and fracture. This model is implemented into a fully coupled mechanical deformation, gas flow and heat transport finite element simulator. To predict the amount of CO2 sequested, the extended Langmuir sorption model is used, with parameters values taken from the literature. The coupled heat and gas flow equations, are solved in COMSOL using the finite element method. The simulation results for a constant volume reservoir demostrate that thermal strain acts to significantly reduce both CO2 injectivity and adsorption capacity. These impacts need to be considered in the calculation of the optimum injection rate and the total sequestration capacity.

  9. IEA low NOx combustion project Stage III. Low NOx combustion and sorbent injection demonstration projects. V.2

    International Nuclear Information System (INIS)

    Payne, R.

    1991-03-01

    This report summarizes the main results from an IES project concerning the demonstration of low-NO x combustion and sorbent injection as techniques for the control of NO x and SO x emissions from pulverized coal fired utility boilers. The project has built upon information generated in two previous stages of activity, where NO x and SO x control processes were evaluated at both fundamental and pilot-scales. The concept for this stage of the project was for a unique collaboration, where the participating countries (Canada, Denmark and Sweden, together with the United States) have pooled information from full scale boiler demonstrations of low-NO x burner and sorbent injection technologies, and have jointly contributed to establishing a common basis for data evaluation. Demonstration testing was successfully carried out on five wall-fired commercial boiler systems which ranged in size from a 20 MW thermal input boiler used for district heating, up to a 300 MW electric utility boiler. All of these units were fired on high-volatile bituminous coals with sulfur contents ranging from 0.6-3.2 percent. At each site the existing burners were either modified or replaced to provide for low-NO x combustion, and provisions were made to inject calcium based sorbent materials into the furnace space for SO 2 emission control. The results of sorbent injection testing showed moderate levels of SO 2 removal which ranged from approximately 15 to 55 percent at an injected calcium to sulfur molar ratio to 2.0 and with boiler operation at nominal full load. Sulfur capture was found to depend upon the combined effects of parameters such as: sorbent type and reactivity; peak sorbent temperature; coal sulfur content; and the thermal characteristics of the boilers. (8 refs., 58 figs., 6 tabs.)

  10. Coal background paper. Coal demand

    International Nuclear Information System (INIS)

    1997-01-01

    Statistical data are presented on coal demands in IEA and OECD member countries and in other countries. Coal coaking and coaking coal consumption data are tabulated, and IEA secretariat's coal demand projections are summarized. Coal supply and production data by countries are given. Finally, coal trade data are presented, broken down for hard coal, steam coal, coking coal (imports and export). (R.P.)

  11. Steam gasification of coal, project prototype plant nuclear process heat

    International Nuclear Information System (INIS)

    Heek, K.H. van

    1982-05-01

    This report describes the tasks, which Bergbau-Forschung has carried out in the field of steam gasification of coal in cooperation with partners and contractors during the reference phase of the project. On the basis of the status achieved to date it can be stated, that the mode of operation of the gas-generator developed including the direct feeding of caking high volatile coal is technically feasible. Moreover through-put can be improved by 65% at minimum by using catalysts. On the whole industrial application of steam gasification - WKV - using nuclear process heat stays attractive compared with other gasification processes. Not only coal is conserved but also the costs of the gas manufactured are favourable. As confirmed by recent economic calculations these are 20 to 25% lower. (orig.) [de

  12. Financing clean coal projects in Eastern Europe

    International Nuclear Information System (INIS)

    Jackson, G.

    1992-01-01

    The Trade and Development Program (TDP), a U.S. Government agency, provides funding for US firms to carry out feasibility studies, consultancies, and other planning services related to major projects in developing countries. By providing assistance in project planning, TDP promotes economic development; at the same time, TDP helps US firms get involved in projects that offer significant export opportunities. TDP has programs throughout the developing world, including Central and Eastern Europe, and has recently been authorized to operate in the Newly Independent States (NIS) of the former Soviet Union. The vast size and population of this region, as well as its tremendous infrastructural and basic industrial needs, present new challenges to TDP. The basic TDP program is described below; it is likely to be modified somewhat to meet the specific requirements of the NIS

  13. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    Energy Technology Data Exchange (ETDEWEB)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage

  14. Coal Transition in the Czech Republic. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Reckova, Dominika; Recka, Lukacs; Scasny, Milan

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. Content: History of coal production and coal reserves; Key features of the Czech economy; Fuel mix in the Czech Republic 1990 - 2014; Key features of coal sector in the Czech Republic after 1990; The use of coal in the Czech Republic and its possible replacement: A. Coal as source of Electricity, B. Coal as Heating source, C. Non - energy coal use; The state role in the coal sector after 1990 - mining limits; Measures to ease transition: Phasing-out of mining activities, Rehabilitation of environmentally damaged land, Programmes financing the remediation of ecological damage, Remediation of environmental damage caused by mining; Future outlook; Lessons learned; References; Annex

  15. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  16. CFD modelling and analysis of pulverized coal injection in blast furnace: an overview

    Energy Technology Data Exchange (ETDEWEB)

    Shen, Yansong; Yu, Aibing [Laboratory for Simulation and Modelling of Particulate Systems, School of Materials Science and Engineering, The University of New South Wales (UNSW), Sydney, NSW 2052 (Australia); Zulli, Paul [BlueScope Steel Research (BSR), P.O. Box 202, Port Kembla, NSW 2505 (Australia)

    2011-05-15

    In order to understand the complicated phenomena of pulverized coal injection (PCI) process in blast furnace (BF), several mathematical models have been developed by the UNSW and BSR cooperation. These models are featuring from coal combustion in a pilot-scale test rig, to coal combustion in a real BF, and then to coal/coke combustion in a real BF, respectively. This paper reviews these PCI models in aspects of model developments and model applicability. The model development is firstly discussed in terms of model formulation, their new features and geometry/regions considered. The model applicability is then discussed in terms of main findings followed by the model evaluation on their advantages and limitations. It is indicated that the three PCI models are all able to describe PCI operation qualitatively. The model of coal/coke combustion in a real BF is more reliable for simulating in-furnace phenomena of PCI operation qualitatively and quantitatively. Such model gives a more reliable burnout prediction over the raceway surface, which could better represent the amount of unburnt char entering the coke bed. These models are useful for understanding the flow-thermo-chemical behaviours and then optimising the PCI operation in practice. (Copyright copyright 2011 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  17. Coal Transition in the United States. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Kok, Irem

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. Over the past decade, the US started to cut down the production and the use of coal, which was affected by unfavorable market dynamics and changing federal regulatory environment. Even before the shale gas revolution and uptake of renewables diminish the use of coal in power generation, coal communities were struggling to meet ends. The regional cost differences between producing states, such as the Appalachian and the Powder River Basins, indicates that coal-impacted communities and workers have lived through the impacts of coal transition at varying magnitudes and time periods. In the period between 2014 and 2016, we have seen the crash of major US coal companies due to declining demand for US coal domestically and internationally. Furthermore, Obama administration's climate change policies negatively impacted coal-fired power plants with additional GHG emission requirements, contributing to declining domestic demand for coal. Combined with market downturn, US coal producers already struggle to pay for high operational costs and legal liabilities under bankruptcy conditions. With under-funded state budgets, coal states are also grappling with financial exposure resulting from pension, health care and reclamation liabilities of bankrupt coal companies. In 2016, former President Obama announced the Power Plus Plan to aid coal-impacted communities and workers to prepare for a low carbon future. The federal budget plan targeted diversification of local economies, funding of health and pension funds of miners and retraining for

  18. Coal Transition in the Netherlands. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Gales, Ben; Hoelsgens, Rick

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. This document provides on overview of coal transitions in the Netherlands in the post-war period. The main focus is an in depth case study of the reconversion of the Limburg region in the South-east of the country which took place from 1965 to 1990. This is discussed in the first part of the document. The later part of the document discusses the re-emergence of coal as an energy source in the Netherlands and present challenges to phasing out coal use

  19. Lessons from previous 'coal Transitions'. High-level summary for decision-makers, Part of 'Coal Transitions: Research and Dialogue on the Future of Coal' Project

    International Nuclear Information System (INIS)

    Caldecott, Ben; Sartor, Oliver; Spencer, Thomas

    2017-01-01

    The need for a so-called 'just transition' is acknowledged, away from carbon intensive activities, such as coal production and use. But what might a just transition look like in practice? What specific risks need to be managed and what are the best approaches to managing them? There is an urgent need to develop a deeper understanding of these issues. It is to this need that this report tries to respond. It provides a summary of lessons from six historical case studies of regional coal mining transitions that have occurred or are ongoing in Europe and the United States in recent decades. These case studies and this report were developed as part of a broader project led by IDDRI and Climate Strategies, entitled 'Coal Transitions: Research and Dialogue on the Future of Coal'. This project seeks to utilise these historical lessons to facilitate the development of feasible coal transition scenarios in large coal producing countries today'

  20. Japan`s sunshine project. 17.. 1992 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This report describes the achievement of coal liquefaction and gasification technology development in the Sunshine Project for FY 1992. It presents the research and development of coal liquefaction which includes studies on reaction mechanism of coal liquefaction and catalysts for coal liquefaction, the research and development of coal gasification technologies which includes studies on gasification characteristics of various coals and improvement of coal gasification efficiency, the development of bituminous coal liquefaction which includes engineering, construction and operation of a bituminous coal liquefaction pilot plant and research by a process supporting unit (PSU), the development of brown coal liquefaction which includes research on brown coal liquefaction with a pilot plant and development of techniques for upgrading coal oil from brown coal, the development of common base technologies which includes development of slurry letdown valves and study on upgrading technology of coal-derived distillates, the development of coal-based hydrogen production technology with a pilot plant, the development of technology for entrained flow coal gasification, the assessment of coal hydrogasification, and the international co-operation. 4 refs., 125 figs., 39 tabs.

  1. Australia's export coal industry: a project of the Coal Australia Promotion Program. 2. ed.

    International Nuclear Information System (INIS)

    1995-01-01

    This booklet presents an overview of the Australian coal industry, emphasises the advantages of using Australian coal and outlines government policies, both Commonwealth and State, which impact on coal mine development, mine ownership and coal exports. It also provides information on the operations and products of each producer supplying coal and coke to export markets and gives contact details for each. The emphasis is on black coal, but information on coal briquettes and coke is also provided. Basic information on the rail networks used for the haulage of export coal and on each of the bulk coal loading terminals is also included.(Author). 3 figs., photos

  2. Volatile release and particle formation characteristics of injected pulverized coal in blast furnaces

    International Nuclear Information System (INIS)

    Chen, Wei-Hsin; Du, Shan-Wen; Yang, Tsung-Han

    2007-01-01

    Volatiles release and particle formation for two kinds of pulverized coals (a high volatile bituminous coal and a low volatile bituminous coal) in a drop tube furnace are investigated to account for the reactions of pulverized coal injected in blast furnaces. Two different sizes of feed particles are considered; one is 100-200 mesh and the other is 200-325 mesh. By evaluating the R-factor, the devolatilization extent of the larger feed particles is found to be relatively poor. However, the swelling behavior of individual or two agglomerated particles is pronounced, which is conducive to gasification of the chars in blast furnaces. In contrast, for the smaller feed particles, volatiles liberated from the coal particles can be improved in a significant way as a result of the amplified R-factor. This enhancement can facilitate the performance of gas phase combustion. Nevertheless, the residual char particles are characterized by agglomeration, implying that the reaction time of the char particles will be lengthened, thereby increasing the possibility of furnace instability. Double peak distributions in char particle size are observed in some cases. This possibly results from the interaction of the plastic state and the blowing effect at the particle surface. Considering the generation of tiny aerosols composed of soot particles and tar droplets, the results indicate that their production is highly sensitive to the volatile matter and elemental oxygen contained in the coal. Comparing the reactivity of the soot to that of the unburned char, the former is always lower than the latter. Consequently, the lower is the soot formation, the better is the blast furnace stability

  3. Central Arkansas Energy Project. Coal to medium-Btu gas

    Science.gov (United States)

    1982-05-01

    The Central Arkansas Energy Project has as its objective the conversion of coal in a central location to a more readily usable energy source, medium Btu gas (MBG), for use at dispersed locations as fuel for power production and steam generation, or as a feedstock for chemical processing. The project elements consist of a gasification facility to produce MBG from coal, a pipeline to supply the MBG to the dispersed sites. The end of line users investigated were the repowering or refueling of an existing Arkansas Power and Light Co. Generating station, an ammonia plant, and a combined cycle cogeneration facility for the production of steam and electricity. Preliminary design of the gasification plant including process engineering design bases, process flow diagrams, utility requirements, system description, project engineering design, equipment specifications, plot plan and section plot plans, preliminary piping and instrument diagrams, and facilities requirements. Financial analyses and sensitivities are determined. Design and construction schedules and manpower loadings are developed. It is concluded that the project is technically feasible, but the financial soundness is difficult to project due to uncertainty in energy markets of competing fuels.

  4. Coal Calorific Value Prediction Based on Projection Pursuit Principle

    OpenAIRE

    QI Minfang; FU Zhongguang; JING Yuan

    2012-01-01

    The calorific value of coal is an important factor for the economic operation of coal-fired power plant. However, calorific value is tremendous difference between the different coal, and even if coal is from the same mine. Restricted by the coal market, most of coal fired power plants can not burn the designed-coal by now in China. The properties of coal as received are changing so frequently that pulverized coal firing is always with the unexpected condition. Therefore, the researches on the...

  5. Toward an understanding of coal combustion in blast furnace tuyere injection

    Energy Technology Data Exchange (ETDEWEB)

    John G. Mathieson; John S. Truelove; Harold Rogers [BlueScope Steel Research, Port Kembla, NSW (Australia)

    2005-07-01

    The former Broken Hill Proprietary Company Limited, along with its successors BlueScope Steel and BHP Billiton, like many of their iron and steel making counterparts, has had a long history of investigating pulverised coal injection and combustion under the conditions of blast furnace tuyere injection. A succession of pilot scale hot models and combustion test rigs have been constructed and operated at the company's Newcastle Laboratories beginning with the pilot scale hot raceway model in 1981. Each successive generation of test rig has attempted to provide a closer approximation to the actual blast furnace situation with the current test rig (1998 to present) seeking to promote an 'expanding' combusting coal plume. Test rig configuration is demonstrated to have a significant effect on coal burnout at a nominal transit time of 20 ms. The development of the combustion test rigs has been supported through the co-development of a range of sampling and measuring techniques and the application of a number of numerical combustion models. This paper reviews some of the milestones along the path of these investigations, the current understandings and what the future potentially holds. It's not solved yet! 17 refs., 11 figs.

  6. Clean coal technology - Study on the pilot project experiment of underground coal gasification

    International Nuclear Information System (INIS)

    Yang Lanhe; Liang Jie; Yu Li

    2003-01-01

    In this paper, the gasification conditions, the gasifier structure, the measuring system and the gasification rationale of a pilot project experiment of underground coal gasification (UCG) in the Liuzhuang Colliery, Tangshan, are illustrated. The technique of two-phase underground coal gasification is proposed. The detection of the moving speed and the length of the gasification working face is made using radon probing technology. An analysis of the experiment results indicates that the output of air gas is 3000 m 3 /h with a heating value of about 4.18 MJ/m 3 , while the output of water gas is 2000 m 3 /h with a heating value of over 11.00 MJ/m 3 , of which H 2 content is above 40% with a maximum of 71.68%. The cyclical time of two-phase underground gasification is 16 h, with 8 h for each phase. This prolongs the time when the high-heating value gas is produced. The moving speed of the gasification working face in two alternative gasifiers is identified, i.e. 0.204 and 0.487 m/d, respectively. The success of the pilot project experiment of the underground gasification reveals the strides that have been made toward the commercialization of the UCG in China. It also further justifies the reasonability and feasibility of the new technology of long channel, big section, two-phase underground gasification. A conclusion is also drawn that the technology of the pilot project experiment can be popularized in old and discarded coal mines

  7. CO2 Capture and Storage in Coal Gasification Projects

    Science.gov (United States)

    Rao, Anand B.; Phadke, Pranav C.

    2017-07-01

    concerns about climate change problem. Carbon Capture and Storage (CCS) is being considered as a promising carbon mitigation technology, especially for large point sources such as coal power plants. Gasification of coal helps in better utilization of this resource offering multiple advantages such as pollution prevention, product flexibility (syngas and hydrogen) and higher efficiency (combined cycle). It also enables the capture of CO2 prior to the combustion, from the fuel gas mixture, at relatively lesser cost as compared to the post-combustion CO2 capture. CCS in gasification projects is considered as a promising technology for cost-effective carbon mitigation. Although many projects (power and non-power) have been announced internationally, very few large-scale projects have actually come up. This paper looks at the various aspects of CCS applications in gasification projects, including the technical feasibility and economic viability and discusses an Indian perspective. Impacts of including CCS in gasification projects (e.g. IGCC plants) have been assessed using a simulation tool. Integrated Environmental Control Model (IECM) - a modelling framework to simulate power plants - has been used to estimate the implications of adding CCS units in IGCC plants, on their performance and costs.

  8. Optimal scheduling for enhanced coal bed methane production through CO2 injection

    International Nuclear Information System (INIS)

    Huang, Yuping; Zheng, Qipeng P.; Fan, Neng; Aminian, Kashy

    2014-01-01

    Highlights: • A novel deterministic optimization model for CO 2 -ECBM production scheduling. • Maximize the total profit from both sales of natural gas and CO 2 credits trading in the carbon market. • A stochastic model incorporating uncertainties and dynamics of NG price and CO 2 credit. - Abstract: Enhanced coal bed methane production with CO 2 injection (CO 2 -ECBM) is an effective technology for accessing the natural gas embedded in the traditionally unmineable coal seams. The revenue via this production process is generated not only by the sales of coal bed methane, but also by trading CO 2 credits in the carbon market. As the technology of CO 2 -ECBM becomes mature, its commercialization opportunities are also springing up. This paper proposes applicable mathematical models for CO 2 -ECBM production and compares the impacts of their production schedules on the total profit. A novel basic deterministic model for CO 2 -ECBM production including the technical and chemical details is proposed and then a multistage stochastic programming model is formulated in order to address uncertainties of natural gas price and CO 2 credit. Both models are nonlinear programming problems, which are solved by commercial nonlinear programming software BARON via GAMS. Numerical experiments show the benefits (e.g., expected profit gain) of using stochastic models versus deterministic models

  9. Damage Effects and Fractal Characteristics of Coal Pore Structure during Liquid CO2 Injection into a Coal Bed for E-CBM

    Directory of Open Access Journals (Sweden)

    Li Ma

    2018-05-01

    Full Text Available Pore structure has a significant influence on coal-bed methane (CBM enhancement. Injecting liquid CO2 into coal seams is an effective way to increase CBM recovery. However, there has been insufficient research regarding the damage effects and fractal characteristics of pore structure at low temperature induced by injecting liquid CO2 into coal samples. Therefore, the methods of low-pressure nitrogen adsorption-desorption (LP-N2-Ad and mercury intrusion porosimetry (MIP were used to investigate the damage effects and fractal characteristics of pore structure with full aperture as the specimens were frozen by liquid CO2. The adsorption isotherms revealed that the tested coal samples belonged to type B, indicating that they contained many bottle and narrow-slit shaped pores. The average pore diameter (APD; average growth rate of 18.20%, specific surface area (SSA; average growth rate of 7.38%, and total pore volume (TPV; average growth rate of 18.26% increased after the specimens were infiltrated by liquid CO2, which indicated the generation of new pores and the transformation of original pores. Fractal dimensions D1 (average of 2.58 and D2 (average of 2.90 of treated coal samples were both larger the raw coal (D1, average of 2.55 and D2, average of 2.87, which indicated that the treated specimens had more rough pore surfaces and complex internal pore structures than the raw coal samples. The seepage capacity was increased because D4 (average of 2.91 of the treated specimens was also higher than the raw specimens (D4, average of 2.86. The grey relational coefficient between the fractal dimension and pore structure parameters demonstrated that the SSA, APD, and porosity positively influenced the fractal features of the coal samples, whereas the TPV and permeability exerted negative influences.

  10. Report on the achievements in the Sunshine Project in fiscal 1987. Surveys on coal selection and coal types (Surveys on coal resources for liquefaction); 1987 nendo tanshu sentei chosa tanshu chosa seika hokokusho. Ekikayo sekitan shigen chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The survey purpose is to identify availability of coal resources for liquefaction in major coal producing countries in the Pacific basin area. Therefore, collection is carried out on such data as coal existing conditions, coal qualities, production quantities, and infrastructures on coal mines being operated and projects under development or investigation. Coal samples are collected in wide range and exhaustively unbiased to particular coal fields and mines to acquire data to perform selection and evaluation of coals that can be fed to coal liquefying plants. The present survey was intended to acquire fundamental data for the liquefying coal selection, such as coal existing conditions, natures, and infrastructures for the coal resources, taking up as the survey object countries the State of Alaska, U.S.A. and Indonesia. The coal types as the object of the survey are mainly sub-bituminous coal, and additionally brown coal and partly bituminous coal. The amount of coal deposit as the subject of the investigation is 100 million tons or more as the verified reserve. The subject areas cover coal mines in the State of Alaska, U.S.A. (Northern Alaska, Nenana, Beluga, and Matanuska coal fields), and Indonesia (the Sumatra and Kalimantan islands). The survey items are made up of 14 items (see the coal mine survey tables in JN0040851). (NEDO)

  11. Socio-economic impacts - an overview based on coal mining projects

    International Nuclear Information System (INIS)

    Singh, V.K.

    1994-01-01

    Socio-economic impacts of coal projects have assumed importance as new projects are affecting tribal/underdeveloped areas. The paper highlights the impacts on land uses and on life and culture of the habitats. It assesses socio-economic impacts and furnishes financial implications of rehabilitation. Some suggestions have also been given to neutralize the stresses developed due to development of coal fields

  12. Coal Transition in the United Kingdom. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Fothergill, Steve

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. The UK has virtually completed its move away from the production and use of coal - an astonishing transformation for an economy that once relied overwhelmingly on coal power. This is however a transformation that was never really 'planned' and the move away from coal started long before concerns about climate change achieved political prominence. Until as late as November 2015, for example, there was no government commitment to phase out coal in UK electricity generation. But it was already happening, and some of the most rapid change was actually in 2016, triggered in particular by the impact of a 'carbon tax' which has tipped the economics away from coal to gas-fired generation. A handful of coal-fired power stations will remain on the grid for a few years to help meet peak demand, but to all intents the UK is already entering the post-coal era. Whether this has been achieved without undue pain to coal mining areas is however deeply questionable. Job losses were for many years managed by a combination of redundancies and transfers to surviving mines. Redundancy payments, welfare benefits and early access to pensions provided support former miners, and careers advice and training was on offer. Most former miners have now reached retirement age. The big problem for mining communities has been replacement of the lost jobs. The UK has a long history of efforts to regenerate areas affected by coal closures and there is clear evidence that this has delivered positive results in the form of new jobs. Nevertheless, there continues to

  13. Coal

    International Nuclear Information System (INIS)

    Teissie, J.; Bourgogne, D. de; Bautin, F.

    2001-12-01

    Coal world production represents 3.5 billions of tons, plus 900 millions of tons of lignite. 50% of coal is used for power generation, 16% by steel making industry, 5% by cement plants, and 29% for space heating and by other industries like carbo-chemistry. Coal reserves are enormous, about 1000 billions of tons (i.e. 250 years of consumption with the present day rate) but their exploitation will be in competition with less costly and less polluting energy sources. This documents treats of all aspects of coal: origin, composition, calorific value, classification, resources, reserves, production, international trade, sectoral consumption, cost, retail price, safety aspects of coal mining, environmental impacts (solid and gaseous effluents), different technologies of coal-fired power plants and their relative efficiency, alternative solutions for the recovery of coal energy (fuel cells, liquefaction). (J.S.)

  14. Coal Transition in Poland. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Szpor, Aleksander

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. The restructuring of the Polish coal sector is inextricably related to the democratic transformation which began in 1989. The economic dimension of the transformation is manifested in the shift from central planning to the free market. Although this process brought economic growth, it has had severe social costs. The main goals of the coal sector restructuring were to achieve its profitability and competitiveness on the global market. However, even with a very quick down-sizing of production and employment, which positively affected the mines' productivity, these goals were not achieved. Neither the profitability of the sector nor the sustainability of the labour restructuring were achieved. There were three main reasons for lack of success in this process. Firstly, the rapid changes of governments making impossible implementation of long term strategies and ensure implementation of market rules in the sector. Secondly, the pressure from trade unions on sustaining the status quo - state owed structure of mining companies, professional privileges and increasing salaries. Thirdly, the lack of sufficient incentives for retraining the miners and revitalising the areas exposed the most on the coal sector restructuring. Content: Introduction; Historical background; Structure of the coal and energy sector; Policies for the restructuring of the coal sector: Main actors in the process, Governmental programs, Instruments for easing the restructuring processes; Conclusions and lessons learnt

  15. Synchronized droplet size measurements for Coal-Water-Slurry (CWS) diesel sprays of an electronically-controlled fuel injection system

    Science.gov (United States)

    Kihm, K. D.; Terracina, D. P.; Payne, S. E.; Caton, J. A.

    Experiments were completed to study intermittent coal-water slurry (CWS) fuel sprays injected from an electronically-controlled accumulator injector system. A laser diffraction particle analyzing (LDPA) technique was used to measure the spray diameters (Sauter mean diameter, SMD) assuming the Rosin-Rammler two parameter model. In order to ensure an accurate synchronization of the measurement with the intermittent sprays, a new synchronization technique was developed using the light extinction signal as a triggering source for the data taking initiation. This technique allowed measurement of SMD's near the spray tip where the light extinction was low and the data were free from the multiscattering bias. Coal-water slurry fuel with 50% coal loading in mass containing 5 (mu)m mass median diameter coal particulates was considered. Injection pressures ranging from 28 to 110 MPa, two different nozzle orifice diameters, 0.2 ad 0.4 mm, and four axial measurement locations from 60 to 120 mm from the nozzle orifice were studied. Measurements were made for pressurized (2.0 MPa in gauge) and for ambient chamber conditions. The spray SMD showed an increase with the distance of the axial measurement location and with the ambient gas density, and showed a decrease with increasing injection pressure. A correlation of the Sauter mean diameter with the injection conditions was determined. The results were also compared with previous SMD correlations that were available only for diesel fuel sprays.

  16. Technical project of complex fast cycle heat treatment of hydrogenous coal preparation

    OpenAIRE

    Moiseev, V. A.; Andrienko, V. G.; Pileckij, V. G.; Urvancev, A. I.; Gvozdyakov, Dmitry Vasilievich; Gubin, Vladimir Evgenievich; Matveev, Aleksandr Sergeevich; Savostiyanova, Ludmila Viktorovna

    2015-01-01

    Problems of heat-treated milled hydrogenous coal preparation site creation in leading fast cycle heat treatment complex were considered. Conditions for effective use of electrostatic methods of heat-treated milled hydrogenous coal preparation were set. Technical project of heat treatment of milled hydrogenous coal preparation site was developed including coupling of working equipment complex on fast heat treatment and experimental samples of equipment being designed for manufacturing. It was ...

  17. Method of cutting steeply falling coal beds. [Bacteria, which only grow on methane, are injected into the coal bed and form low viscosity polysaccharides: as a result the coal collapses into the haulage gallery and is hauled away

    Energy Technology Data Exchange (ETDEWEB)

    Gretsinger, B Ye; Chernyshenko, D V; Levin, A D; Malashenko, Yu R; Shinkovskiy, V A; Shurova, Z P; Volkov, V I

    1982-01-01

    The purpose of the invention is to reduce outlays for collapse and output of coal by creating artificial cavities of sliding along the coal bed in the surrounding rocks. This goal is achieved because in the well drilled in the bed for the entire height of the level, a suspension of cells of methane-oxidizing microorganisms is injected. The methane-oxidizing microorganisms used are, for example, the thermophilic culture Methylococcus thermophilus of strains ShP which grow at 45-65/sup 0/ C, or the mesophilic culture Methanomonas rubna of strains 15 Sh growing at 20-37/sup 0/ C. As a result of the vital activity of these cultures, polysaccharides are formed with viscosity of 5-7 and 3-4 St respectively. The mine pressure disrupts the blocks between the wells, and the outline section of the steeply dropping coal bed, being destroyed, slides on the products of vital activity of the microorganisms to the haulage gallery. Then the coal drops on cross cuts to the field gallery through which it is transported. Studies established that the only coal substrate which is suitable for growth of these microorganism cultures is methane. The synthesis of one g of absolutely dry substance of these microorganism requires 1.78 g of methane and 4.7 g of oxygen. The cultures are resistant to hydrostatic pressure from 20 to 150 atm and short-term pressure of gradient drops which occur during injection of the cellular suspension into the coal bed. They are filtered through the coal with preservation of the oxidizing and reproductive properties and are cultivated on the methane contained in the bed and form considerable number of exopolysaccarides. The polysaccarides weaken the bond between the bed and the surrounding rocks and serve as a unique lubricant promoting the sliding towards the haulage gallery of the coal blocks destroyed by mine pressure.

  18. Plan for injection of coal combustion byproducts into the Omega Mine for the reduction of acid mine drainage

    International Nuclear Information System (INIS)

    Gray, T.A.; Moran, T.C.; Broschart, D.W.; Smith, G.A.

    1998-01-01

    The Omega Mine Complex is located outside of Morgantown, West Virginia. The mine is in the Upper Freeport Coal, an acid-producing coal seam. The coal was mined in a manner that has resulted in acid mine drainage (AMD) discharges at multiple points. During the 1990's, the West Virginia Division of Environmental Protection (WVDEP) assumed responsibility for operating a collection and treatment system for the AMD. Collection and treatment costs are approximately $300,000 per year. Injecting grout into the mine workings to reduce AMD (and thus reducing treatment costs) is proposed. The procedure involves injecting grout mixes composed primarily of coal combustion byproducts (CCB's) and water, with a small quantity of cement. The intention of the injection program is to fill the mine voids in the north lobe of the Omega Mine (an area where most of the acidity is believed to be generated) with the grout, thus reducing the contact of air and water with potentially acidic material. The grout mix design consists of an approximate 1:1 ratio of fly ash to byproducts from fluidized bed combustion. Approximately 100 gallons of water per cubic yard of grout is used to achieve flowability. Observation of the mine workings via subsurface borings and downhole video camera confirmed that first-mined areas were generally open while second-mined areas were generally partially collapsed. The injection program was developed to account for this by utilizing closer injection hole spacing in second-mined areas. Construction began in January 1998, with grout injection expected to commence in mid-April 1998

  19. Port projects put on hold as coal imports peak

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-15

    UK ports and rail operators have invested heavily to improve available capacity, but now imports are leveling off. In January to May 2007, UK coal imports totalled 19.2 mt, a drop of 6% compared to the same period in 2006. Indigenous production dropped more drastically, 23.8% to 6.62 mt. UK coal demand will be determined by such factors as the Large Combustion Plant Directive. There appears to be a second wave in the 'dash for gas' generation game as gas prices have fallen. Investment at Immingham's terminal has enabled the UK to cope with increased coal imports. ABP is now considering another coal terminal outside the locks at Hull. These plans are outlined in the article. Coal handling at Newcastle is also reported. 3 figs., 1 photos.

  20. Coal-fired MHD combustor development project: Phase 3D

    Science.gov (United States)

    1985-05-01

    This fourth quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase 3D) presents the accomplishments during the period February 1 to April 30, 1985. The scope of work covered by this quarterly report encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, assembly and checkout of first and second stage hardware, second stage design verification testing, designs for a continuous slag rejector and low preheat inlet section, and planning for power train testing. Progress includes the following: assembly and checkout of the second first stage, two second stages, and PEM was completed and the hardware was shipped to CDIF and FETS; integration of first and second stage hardware on the FETS Cell No. 2 test stand was completed, cold flow functional tests were performed, and hot fire checkout testing was initiated; assembly of the continuous slag rejector test set-up was 70% completed; the low preheat air inlet section Preliminary Design Review was held (work on the detail design was initiated and is 85% complete); and the Users' Manual was updated to include material for the second stage and final revisions to the power train test plan were made.

  1. Dustfall design of open coal yard in the power plant-a case study on the closed reconstruction project of coal storage yard in shengli power plant

    Science.gov (United States)

    Wang, Kunpeng; Ji, Weidong; Zhang, Feifei; Yu, Wei; Zheng, Runqing

    2018-02-01

    This thesis, based on the closed reconstruction project of the coal storage yard of Shengli Power Plant which is affiliated to Sinopec Shengli Petroleum Administration, first makes an analysis on the significance of current dustfall reconstruction of open coal yard, then summarizes the methods widely adopted in the dustfall of large-scale open coal storage yard of current thermal power plant as well as their advantages and disadvantages, and finally focuses on this project, aiming at providing some reference and assistance to the future closed reconstruction project of open coal storage yard in thermal power plant.

  2. Energy saving and emission reduction: A project of coal-resource integration in Shanxi Province, China

    International Nuclear Information System (INIS)

    Zhang Jianjun; Fu Meichen; Geng Yuhuan; Tao Jin

    2011-01-01

    The small or middle coal mines with illegal operations in developing countries or regions can cause bad energy waste and environmental disruption. The project of coal-resource integration in Shanxi Province of China gives a new idea or an approach to energy saving and emission reduction. It is a social- and economic-ecological project. The paper shows the targets of energy saving and emission reduction in Shanxi Province, and analyses the aims, significance, design process and implementation of the integration project. Based on that, the paper discusses the challenges and opportunities the project brings. The analysis shows that the project of coal-resource integration in developing countries or regions can effectively improve mining technologies, collect capital and impel international cooperation and exchange. Finally, the paper analyses the concerns about the future, including the possible problems of implementation period, industrial updating, environmental impact and re-employment. However, the successful integration of coal resources can mitigate energy crisis and climate crisis and promote cleaner production effectively. - Highlights: → Coal-resource integration gives a new idea or an approach to energy saving and emission reduction. → Coal-resource integration mitigates climate crisis and promotes cleaner production. → Coal-resource integration brings challenges and opportunities to traditional mining industries.

  3. Indirect coal liquefaction - the first commercial CTL project in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, K.; Battensby, D.; Marsico, C.; Hooper, M.; Mather, C. [Uhde GmbH (Germany)

    2006-07-01

    The polygeneration of fuels, chemical and power offers an innovative and economically advantageous way to utilise disadvantaged fuels, such as lignite, waste coal and petroleum coke, in a coal-to-liquids (CTL) plant by means of integration of three main process blocks: gasification island to convert coal into clean synthesis gas; Fischer-Tropsch synthesis to convert synthesis gas into clean liquid fuels and chemicals; and combustion of synthesis gas to produce electric power and steam. This paper describes the process and technology side of this indirect coal liquefaction project with key plant data that has been elaborated for a commercial scale CTL project, which is expected to be the first CTL plant in the USA. The plant will use the Shell Coal Gasification process. 6 figs.

  4. Japan`s New Sunshine Project. 20. 1995 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The paper described a summary of the 1995 study on coal liquefaction and gasification under the New Sunshine Project. As for coal liquefaction, a study was made of liquefaction characteristics and catalysts of various coals. Also studied were liquefaction conditions for quality improvement of liquefaction products, an evaluation method of quality of coal liquid, and a utilization method of coal liquid. In order to prevent carbonization and realize effective liquefaction, a study was conducted for elucidation of the reaction mechanism of high pressure hydrogenation. In a 150t/d pilot plant using hydrogen transfer hydrogenation solvents, the NEDOL method was studied using various catalysts and kinds of coals. This is a step prior to data acquisition for engineering, actual construction of equipment and operation. A 1t/d process supporting unit is a unit to support it. The unit conducts studies on slurry letdown valves and synthetic iron sulfide catalysts, screening of Chinese coals, etc. As to coal gasification, the paper added to the basic research the combined cycle power generation using entrained flow coal gasification for improvement of thermal efficiency and environmental acceptability and the HYCOL method for hydrogen production. 68 refs., 40 figs.

  5. Dry sorbent injection of trona to control acid gases from a pilot-scale coal-fired combustion facility

    Directory of Open Access Journals (Sweden)

    Tiffany L. B. Yelverton

    2016-01-01

    Full Text Available  Gaseous and particulate emissions from the combustion of coal have been associated with adverse effects on human and environmental health, and have for that reason been subject to regulation by federal and state governments. Recent regulations by the United States Environmental Protection Agency have further restricted the emissions of acid gases from electricity generating facilities and other industrial facilities, and upcoming deadlines are forcing industry to consider both pre- and post-combustion controls to maintain compliance. As a result of these recent regulations, dry sorbent injection of trona to remove acid gas emissions (e.g. HCl, SO2, and NOx from coal combustion, specifically 90% removal of HCl, was the focus of the current investigation. Along with the measurement of HCl, SO2, and NOx, measurements of particulate matter (PM, elemental (EC, and organic carbon (OC were also accomplished on a pilot-scale coal-fired combustion facility. Gaseous and particulate emissions from a coal-fired combustor burning bituminous coal and using dry sorbent injection were the focus of the current study. From this investigation it was shown that high levels of trona were needed to achieve the goal of 90% HCl removal, but with this increased level of trona injection the ESP and BH were still able to achieve greater than 95% fine PM control. In addition to emissions reported, measurement of acid gases by standard EPA methods were compared to those of an infrared multi-component gas analyzer. This comparison revealed good correlation for emissions of HCl and SO2, but poor correlation in the measurement of NOx emissions.

  6. Successful continuous injection of coal into gasification and PFBC system operating pressures exceeding 500 psi - DOE funded program results

    Energy Technology Data Exchange (ETDEWEB)

    Saunders, T.; Aldred, D.; Rutkowski, M. [Stamet Inc., North Holywood, CA (United States)

    2006-07-01

    The current US energy program is focussed towards commercialisation of coal-based power and IGCC technologies that offer significant improvements in efficiency and reductions in emissions. For gasification and pressurised fluidized bed combustors to be widely accepted, certain operational components need to be significantly improved. One of the most pressing is provision of reliable, controlled and cost-effective solid fuel feeding into the pressure environment. The US Department of Energy has funded research to develop the unique Stamet 'Posimetric{reg_sign} Solids Pump' to be capable of feeding coal into current gasification and PFBC operating pressures. The research objective is a mechanical rotary device able to continuously feed and meter coal into pressured environments of at least 34 bar (500 psi). The research program comprised an initial design and testing phase to feed coal into 20 bar (300 psi) and a second phase for feeding into 34 bar (500 psi). The first phase target was achieved in December 2003. Following modification and optimization, in January 2005, the Stamet Pump achieved a world-record pressure level for continuous injection of coal of 38 bar (560 psi). Research is now targeting 69 bar (1000 psi). The paper reviews the successful pump design, optimisations and results of the testing. 16 figs., 2 tabs.

  7. Report on evaluation for SRC-2 coal liquefaction project; SRC-II sekitan ekika project hyoka sagyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-10-01

    Among the EDS, H-Coal and SRC-2 lined up in the coal liquefaction project of the U.S., the SRC is aimed at producing 6,000 t/day as a module for a 30,000 t/day commercial plant. They expect Ash contents (iron, sulfur, etc.) in coal without basically using catalysts. The products are applicable to fuels for electricity and gas for the moment. In the element technology, there are some problems in manufacturing hydrogen by gasification of residuals as well as in slurry systems, reaction towers, etc.. In the 30,000 ton commercial plant, the coal-liquefied oil costs $19.89/bbl (price as of 1978) assuming coal costs $29.47; therefore, the feasibility is strong as a substitute for petroleum. Japan's share for the required funds will be 86.8 billion yen (if 250 yen per dollar). Since the kinds of coal are conceivably increased in number through the improvement of the process, the Pacific rim countries and these which lie on the Indian Ocean are assumed to be the major coal producing countries for Japan. The stability in storage of coal-liquefied oil is experimentally excellent, as is the compatibility with petroleum products for example. Great results can be expected in the technical know-how and the spread of element technology for Japan. (NEDO)

  8. Report on evaluation for SRC-2 coal liquefaction project; SRC-II sekitan ekika project hyoka sagyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-10-01

    Among the EDS, H-Coal and SRC-2 lined up in the coal liquefaction project of the U.S., the SRC is aimed at producing 6,000 t/day as a module for a 30,000 t/day commercial plant. They expect Ash contents (iron, sulfur, etc.) in coal without basically using catalysts. The products are applicable to fuels for electricity and gas for the moment. In the element technology, there are some problems in manufacturing hydrogen by gasification of residuals as well as in slurry systems, reaction towers, etc.. In the 30,000 ton commercial plant, the coal-liquefied oil costs $19.89/bbl (price as of 1978) assuming coal costs $29.47; therefore, the feasibility is strong as a substitute for petroleum. Japan's share for the required funds will be 86.8 billion yen (if 250 yen per dollar). Since the kinds of coal are conceivably increased in number through the improvement of the process, the Pacific rim countries and these which lie on the Indian Ocean are assumed to be the major coal producing countries for Japan. The stability in storage of coal-liquefied oil is experimentally excellent, as is the compatibility with petroleum products for example. Great results can be expected in the technical know-how and the spread of element technology for Japan. (NEDO)

  9. FY 2001 report on the coal engineer training project. Advanced course; 2001 nendo sekitan gijutsusha yose jigyo. Jokyu kosu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    The paper summed up the details of the training in the coal engineer training project (advanced course) carried out in FY 2001. The term of training was from June 1 to November 14, 2001. In the business training, lectures were given on coal geology, coal exploration technology, coal mining technology, draft survey, coal sampling and analysis method, maritime freight transport mainly of coal, coal utilization technology, environmental protection technology related to coal utilization, projects on overseas coal development, physical properties/chemical characteristics and usage of coal, and coal situation in China. In the inspection training, inspectional visits were paid to Taiheiyo Coal Mining Co., Noshiro Power Plant of the Tohoku Electric Power Co., Kumagaya Plant of Taiheiyo Cement Corp. and Keihin Steelworks of NKK Corp. In the training overseas, inspectional visits were paid to the following in Australia: coal mines of Moonee, Rix's Creek, West Wallsend, Bloomfield, Beltana, Bulga, South Bulga, Mt. Thorley, Warkworth, Liddell, Wambo, Mount Owen, Camberwell, etc. and harbors of Port Newcastle, Port Kembla Coal Terminal, etc. (NEDO)

  10. Interim report on Tanjung Enim IV coal exploration project. South Arahan area (1998/1999)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The exploration project in Indonesia covered geological mapping, drilling, geophysical logging, underground water pumping tests, vertical seismic profiling (VSP), and seismic reflection survey. Ten boreholes were drilled. Moreover, coal property analysis, geotechnical rock test, geochemical analysis, and the like were conducted by examining core specimens sampled from the boreholes. It was found that there are three main coal beds which continuously extend to the two ends of the synclinic structure. It was also found that there is a 6m-thick coal bed 200m further below the three main coal beds, and it is estimated to produce approximately 6,000kcal/kg. Coal from two of the three beds produces 5,000kcal/kg, containing but a little ash and sulfur. Coal from the third includes 1.17% of sulfur. Coal in all the beds is summed up, and then it is estimated that there is approximately 1,054-million tons of coal in reserve in the South Arahan area. (NEDO)

  11. Coal Transition in Spain. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Del Rio, Pablo

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. Spain has had a long tradition of coal mining at least since the 18. century. However, it is also one of the jurisdictions committing to phase-out of subsidies and implementing it in recent times. This case study discusses the main features of the coal transition in Spain, the factors influencing this transition as well as the policies which both drove it and accompanied their detrimental socioeconomic effects on the workers and regions. The analysis is based on a desktop research of relevant documents, including official communications from the Ministry of Industry (MINETUR) and the European Commission as well as statements of position from the industry association (CARBUNION) and labour unions (UGT and CCOO). Documents on national coal from other institutions (Foundations, NGOs) have also been consulted. Finally, an analysis of articles in the mass media has been carried out. This contains useful statements from different types of stakeholders. A strong reduction in production and employment in the coal industry has been experienced at least in the last two decades in this country. Successive plans by the government have aimed at reducing coal production, early retirement of workers and closing mines. Caught in the middle of the mining coalition on the one hand and EU legislation and public opinion on the other, the government has had to approve drastic measures leading to phase out. On the other hand, it has tried to accompany the phase out with measures which have tried to mitigate the negative impact on the affected zones

  12. A study of the solid and gaseous products generated by a dc plasma torch under coal and steam injection

    International Nuclear Information System (INIS)

    Beuthe, T.G.; Chang, J.S.; Irons, G.A.; Lu, W.K.; Berezin, A.A.; Chu, E.Y.

    1988-01-01

    In this work, the solid and gaseous products generated by a DC plasma torch under simultaneous coal powder and supersaturated steam injection are examined. A range of steam (0.75[g/min]) and coal powder (0-10[g/min]) were injected into the hot argon plasma and the product gases were analyzed by gas chromatographic techniques, an optical multichannel analyzer and infrared CO and CO/sub 2/ analyzers. The solid product generated by the present process was analyzed using neutron activation analysis and scanning electron microscopy. Results indicate that the most common product constituents consisted of simple compounds such as carbon dioxide, carbon monoxide, hydrogen, oxygen and nitrogen. Detailed analysis using infra-red analyzers and gas chromatographic techniques showed that the product gas contained significant amounts of H/sub 2/(--2[%], CO(0.5-4.5[%]) and CO/sub 2/(0.5-1.0[%]) gases, where approximately 80 (%) was still argon gas. Evidence was found of slight amounts of OH, but no significant amount of CH/sub 2/ compounds were detected. The energy yields of the CO/sub 2/ and CO production rates were in the range of 4-10 and 5-25 [g/kWhr] respectively. The produced gas CO:CO/sub 2/ concentration ratio was approximately in the order of 10. Neutron activation analysis shows that the solid product generated in the present process is significantly different from the ash produced by a conventional coal fired furnace. The overall concentrations of trace oxides are significantly lower in the solid product than in conventional ash, tending to support the hypothesis that the solid product is a coke rather than an ash. The conditions in the plasma torch also seem to favour the removal of Ca, S and Si oxides from the coal. Downstream temperature analysis indicates the product gas can be heated from 600 to 1500(K) depending on the torch operating conditions and injectant flowrates

  13. Mercury Emissions Capture Efficiency with Activated Carbon Injection at a Russian Coal-Fired Thermal Power Plant

    Science.gov (United States)

    This EPA-led project, conducted in collaboration with UNEP, the Swedish Environmental Institute and various Russian Institutes, that demonstrates that the mercury emission control efficiencies of activated carbon injection technologies applied at a Russian power plant burning Rus...

  14. Task 27 -- Alaskan low-rank coal-water fuel demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    Development of coal-water-fuel (CWF) technology has to-date been predicated on the use of high-rank bituminous coal only, and until now the high inherent moisture content of low-rank coal has precluded its use for CWF production. The unique feature of the Alaskan project is the integration of hot-water-drying (HWD) into CWF technology as a beneficiation process. Hot-water-drying is an EERC developed technology unavailable to the competition that allows the range of CWF feedstock to be extended to low-rank coals. The primary objective of the Alaskan Project, is to promote interest in the CWF marketplace by demonstrating the commercial viability of low-rank coal-water-fuel (LRCWF). While commercialization plans cannot be finalized until the implementation and results of the Alaskan LRCWF Project are known and evaluated, this report has been prepared to specifically address issues concerning business objectives for the project, and outline a market development plan for meeting those objectives.

  15. Environmental Assessment for Lignite Fuel Enhancement Project, Coal Creek Station, Great River Energy, Underwood, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-01-16

    The US Department of Energy (DOE) has prepared this EA to assess the environmental impacts of the commercial application of lignite fuel enhancement. The proposed demonstration project would be implemented at Great River Energy's Coal Creek Station near Underwood, North Dakota. The proposed project would demonstrate a technology to increase the heating value of lignite and other high-moisture coals by reducing the moisture in the fuels. Waste heat that would normally be sent to the cooling towers would be used to drive off a percentage of the moisture contained within the lignite. Application of this technology would be expected to boost power-generating efficiencies, provide economic cost savings for lignite and sub-bituminous power plants, and reduce air emissions. The proposed project would be constructed on a previously disturbed site within the Coal Creek Station and no negative impacts would occur in any environmental resource area.

  16. CO2 Injectivity in Geological Storages: an Overview of Program and Results of the GeoCarbone-Injectivity Project

    International Nuclear Information System (INIS)

    Lombard, J.M.; Egermann, P.; Azaroual, M.; Pironon, J.; Broseta, D.; Egermann, P.; Munier, G.; Mouronval, G.

    2010-01-01

    The objective of the GeoCarbone-Injectivity project was to develop a methodology to study the complex phenomena involved in the near well bore region during CO 2 injection. This paper presents an overview of the program and results of the project, and some further necessary developments. The proposed methodology is based on experiments and simulations at the core scale, in order to understand (physical modelling and definition of constitutive laws) and quantify (calibration of simulation tools) the mechanisms involved in injectivity variations: fluid/rock interactions, transport mechanisms, geomechanical effects. These mechanisms and the associated parameters have then to be integrated in the models at the well bore scale. The methodology has been applied for the study of a potential injection of CO 2 in the Dogger geological formation of the Paris Basin, in collaboration with the other ANR GeoCarbone projects. (authors)

  17. Scrubbing King Coal's dirty face : a new gasification project southeast of Edmonton hopes to make coal cleaner now and for future generations

    Energy Technology Data Exchange (ETDEWEB)

    Collison, M.

    2008-01-15

    This article described the proposed Dodds-Roundhill Coal Gasification Project. This first commercial coal gasification plant in Canada will be developed by Edmonton-based Sherritt International Corporation, in a 50/50 partnership with the Ontario Teachers' Pension Plan. The project will include a surface coal mine and a coal gasification facility located approximately 80 km southeast of Edmonton, Alberta. Coal gasification is emerging as a clean alternative for converting coal into energy products. It involves the gasification process which breaks down coal to produce hydrogen, carbon monoxide and carbon dioxide, collectively known as synthesis gas (syngas). The syngas can then be used for fuel, as a petrochemical feedstock, or it can be further processed into hydrogen for use by bitumen upgraders and crude oil refineries in Alberta. Carbon dioxide, which is highly concentrated are relatively easy to capture will be either sequestered or used in enhanced oil recovery. Construction will begin in mid-2009 following project application and an environmental impact assessment. 3 figs.

  18. Enhancing the use of coals by gas reburning-sorbent injection: Volume 4 -- Gas reburning-sorbent injection at Lakeside Unit 7, City Water, Light and Power, Springfield, Illinois. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A demonstration of Gas Reburning-Sorbent Injection (GR-SI) has been completed at a cyclone-fired utility boiler. The Energy and Environmental Research Corporation (EER) has designed, retrofitted and tested a GR-SI system at City Water Light and Power`s 33 MWe Lakeside Station Unit 7. The program goals of 60% NO{sub x} emissions reduction and 50% SO{sub 2} emissions reduction were exceeded over the long-term testing period; the NO{sub x} reduction averaged 63% and the SO{sub 2} reduction averaged 58%. These were achieved with an average gas heat input of 22% and a calcium (sorbent) to sulfur (coal) molar ratio of 1.8. GR-SI resulted in a reduction in thermal efficiency of approximately 1% at full load due to firing natural gas which forms more moisture in flue gas than coal and also results in a slight increase in air heater exit gas temperature. Minor impacts on other areas of unit performance were measured and are detailed in this report. The project at Lakeside was carried out in three phases, in which EER designed the GR-SI system (Phase 1), completed construction and start-up activities (Phase 2), and evaluated its performance with both short parametric tests and a long-term demonstration (Phase 3). This report contains design and technical performance data; the economics data for all sites are presented in Volume 5.

  19. Wettability determination by contact angle measurements: hvbB coal-water system with injection of synthetic flue gas and CO2.

    Science.gov (United States)

    Shojai Kaveh, Narjes; Rudolph, E Susanne J; Wolf, Karl-Heinz A A; Ashrafizadeh, Seyed Nezameddin

    2011-12-01

    Geological sequestration of pure carbon dioxide (CO(2)) in coal is one of the methods to sequester CO(2). In addition, injection of CO(2) or flue gas into coal enhances coal bed methane production (ECBM). The success of this combined process depends strongly on the wetting behavior of the coal, which is function of coal rank, ash content, heterogeneity of the coal surface, pressure, temperature and composition of the gas. The wetting behavior can be evaluated from the contact angle of a gas bubble, CO(2) or flue gas, on a coal surface. In this study, contact angles of a synthetic flue gas, i.e. a 80/20 (mol%) N(2)/CO(2) mixture, and pure CO(2) on a Warndt Luisenthal (WL) coal have been determined using a modified pendant drop cell in a pressure range from atmospheric to 16 MPa and a constant temperature of 318 K. It was found that the contact angles of flue gas on WL coal were generally smaller than those of CO(2). The contact angle of CO(2) changes from water-wet to gas-wet by increasing pressure above 8.5 MPa while the one for the flue gas changes from water-wet to intermediate-wet by increasing pressure above 10 MPa. Copyright © 2011 Elsevier Inc. All rights reserved.

  20. Energy and exergy analysis of alternating injection of oxygen and steam in the low emission underground gasification of deep thin coal

    DEFF Research Database (Denmark)

    Eftekhari, Ali Akbar; Wolf, Karl Heinz; Rogut, Jan

    2017-01-01

    Recent studies have shown that by coupling the underground coal gasification (UCG) with the carbon capture and storage (CCS), the coal energy can be economically extracted with a low carbon footprint. To investigate the effect of UCG and CCS process parameters on the feasibility of the UCG-CCS pr....... Additionally, we show that the zero-emission conversion of unmineable deep thin coal resources in a coupled UCG-CCS process, that is not practical with the current state of technology, can be realized by increasing the energy efficiency of the carbon dioxide capture process.......-CCS process, we utilize a validated mathematical model, previously published by the same authors, that can predict the composition of the UCG product, temperature profile, and coal conversion rate for alternating injection of air and steam for unmineable deep thin coal layers. We use the results of the model...

  1. Potential for visible plume formation at a coal-fired boiler using ammonia injection for non-catalytic NOx control

    International Nuclear Information System (INIS)

    Hess, T.

    1993-01-01

    Circulating fluidized bed boilers utilizing ammonia injection for non-catalytic NO x reduction have been highly successful in reducing NO x emissions to very low levels. However, one limitation on this technology is the potential for the formation of visible plumes. One plant, with uncontrolled NO x of about 190 ppm, reduces NO x concentrations to the 20-25 ppm range by injecting ammonia in the boiler's cyclones. However, infrequent, short-lived, white, detached plumes have been noted extending for short distances downwind of the stack. Because unreacted ammonia is present in the flue gas along with HCl from coal combustion, the formation of solid NH 4 Cl in the atmosphere was suspected to be the most likely cause of the visible plume. Simple thermodynamic calculations predict the formation of solid ammonium chloride very soon after the flue gas mixes with cooler ambient air and plume optical density calculations are in reasonable agreement with observed plume density. Stack testing and other tests have been conducted during both plume and non-plume events to confirm that NH 4 Cl formation is the most likely cause of the capacity. As presented in this paper, the test data and theoretical calculations indicate that a visible plume may be expected when as little as 5 ppm of ammonia and HCl are present in the flue gas, depending on observation conditions. Analyses of fuel samples taken during stack tests show about 40% of the chlorine in the low chloride coal fired, typically less than 0.04%, is released from the stack as HCl. Ammonia slip is somewhat variable depending on combustion conditions in the boiler and the temperature at the ammonia injection points

  2. Report of activities of the advanced coal extraction systems definition project, 1979 - 1980

    Science.gov (United States)

    Lavin, M. L.; Isenberg, L.

    1981-01-01

    During this period effort was devoted to: formulation of system performance goals in the areas of production cost, miner safety, miner health, environmental impact, and coal conservation, survey and in depth assessment of promising technology, and characterization of potential resource targets. Primary system performance goals are to achieve a return on incremental investment of 150% of the value required for a low risk capital improvement project and to reduce deaths and disability injuries per million man-hour by 50%. Although these performance goals were developed to be immediately applicable to the Central Appalachian coal resources, they were also designed to be readily adaptable to other coals by appending a geological description of the new resource. The work done on technology assessment was concerned with the performance of the slurry haulage system.

  3. Environmental considerations of coal gasification technology and the Wabash River Repowering Project

    International Nuclear Information System (INIS)

    Lessig, W.S.; Frederick, J.D.

    1993-01-01

    The Clean Air Act Amendments of 1990 have mandated a significant reduction in sulfur dioxide emissions. Coal gasification can assist coal burning utilities in meeting this challenge. The use of combustion turbines in the cycle is an important factor in terms of efficiency and pollution control technologies. The gasification process can be utilized in several applications including 'repowering' existing coal-fired facilities as well as new 'greenfield' projects. This paper addresses the environmental benefits of the repowering application at PSI Energy's Wabash River Station. The environmental impacts of air, water, solid waste, trace hazardous air pollutants, and fuel sources are addressed. Specifically, sulfur removal is discussed on both a technical and an economic level

  4. Coal/Biomass-to-Liquids Demonstration Testing for DLA Energy: Report on Project Tests, Evaluations, and Recommendations

    Science.gov (United States)

    2015-08-20

    Report January 2010-August 2015 Coal/ Biomass -to-Liquids Demonstration Testing for DLA Energy Report on Project Tests, Evaluations, and...produced commercially from coal and biomass mixtures while meeting the requirements of Section 526, which requires that GHG emissions from...gasification equipment, coals, and biomass used, and reports and analyzes the test results. Additionally, the team worked with DOE NETL to conduct

  5. FY 1981 Report on the results of Sunshine Project. Coal energy; 1981 nendo sunshine keikaku seika hokokusho. Sekitan energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    This report presents the results of (researches on solvolysis liquefaction mechanisms and reaction promotion with oil- and coal-based solvents), conducted as part of the research and development project for coal liquefaction techniques. The FY 1981 program includes researches on (1) the effects of liquefaction reaction conditions on liquefaction yield and production of light products for coal species of low degree of carbonization, including brown coal, (2) the effects of pretreatment of coal on its liquefaction reactivity, and (3) up-grading of the solvolysis coal liquid (SCL). For the item (1), HA240 (hydrogenated Ashland's A240) is used to investigate its liquefaction capacity for various coal species of low degree of carbonization, including brown coal. For the item (2), the effects of pretreatment in a hot water bath with reflux was investigated for sub-bituminous coal in the FY 1980. In the FY 1981, various pretreatment methods are attempted for enhancing liquefaction reactivity of brown coal. As a result, it is found that ash content of brown coal is decreased to one-third of the initial level, when it is treated in a diluted hydrochloric acid bath with reflux. For the item (3), SCL hydrogenated by Birch reduction (B-SCL, 1) is compared with H-SCL with respect to properties, structures and thermal crackability, to discuss the items required for the catalyst to be used in the second stage by clarifying effectiveness of the catalyst. (NEDO)

  6. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  7. Comprehensive report to Congress Clean Coal Technology Program. Four Rivers Energy Modernization Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    One of the five projects selected for funding within the Clean Coal Technology Program is a project proposed by Air Products and Chemicals, Inc. (APCI) of Allentown, Pennsylvania. APCI requested financial assistance from DOE for the design, construction, and operation of a 95 megawatt-electric (MWe) gross equivalent, second generation, pressurized, circulating fluidized bed (PCFB) combustor cogeneration facility. The project, named the Four Rivers Energy Modernization Project, is co be located adjacent to an existing APCI chemicals manufacturing facility in Calvert City, Kentucky. Four Rivers Energy Partners, L.P. (FREP), will execute the project. The demonstration plant will produce approximately 70 MWe for the utility grid and an average of 310,000 pounds per hour of process steam for the chemicals manufacturing facility. The project, including the demonstration phase, will last 80 months at a total cost of $360,707,500. DOE`s share of the project cost will be 39.5 percent, or $142,460,000. The objective of the proposed project is to demonstrate a second generation PCFB system based on technology being supplied by Foster Wheeler Energy Corporation (FWEC), Westinghouse Electric Corporation (Westinghouse), and LLB Lurgi Lentjes Babcock Energietechnik GmbH (LLB). The integrated performance to be demonstrated will involve all of the process systems, including coal preparation and feed, sorbent feed, carbonizer, char transfer, PCFB combustor, carbonizer and combustor hot-gas filtration, carbonizer and combustor alkali removal, topping combustor, gas turbine-generator, heat recovery steam generator (HRSG), steam turbine-generator, and balance-of-plant systems. The project will utilize Western Kentucky and Southern Illinois bituminous coal.

  8. Report on the achievements in the Sunshine Project in investigations and studies on treatment technologies for coals used in coal gasification. A report on coal type investigation; Sekitan gas ka yotan no shori gijutsu ni kansuru chosa kenkyu. Tanshu chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    This paper reports the investigation on coal types for coal gasification in the Sunshine Project. With regard to the status of existence, production and dressing of coals as the material for coal gasification and liquefaction, summarized site investigations and sampling were performed on underground mining coal mines being operated in Japan. Test sample coals are put into a data file as the important fundamental data for gasification and liquefaction characteristics tests at the Japan Coal Energy Center. The sampling investigation is planned to start in fiscal 1988. The coal mines having been investigated to date include: Taiheiyo Coal Mine (Kushiro), Mitsui Coal Mining Industry (Miike), Matsushima Coal Mine (Ikejima), Mitsubishi Coal Mining Industry (Minami O-Yubari), Sumitomo Coal Akabira Coal Mine (Akabira), Mitsui Coal Mining Industry (Ashibetsu), and Sorachi Coal Mine (Sorachi). Coal beds subjected to the sampling were selected upon carefully discussing with the site engineers on the current status of the coal mine, and the coal beds that could be operated in the future. The sampling method was such that the whole coal bed from the upper bed to the lower bed at the facing was sampled and put into vinyl sampling bags each at about 2 kg as the target. (NEDO)

  9. Alaska Regional Energy Resources Planning Project. Phase 2: coal, hydroelectric and energy alternatives. Volume I. Beluga Coal District Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Rutledge, G.; Lane, D.; Edblom, G.

    1980-01-01

    This volume deals with the problems and procedures inherent in the development of the Beluga Coal District. Socio-economic implications of the development and management alternatives are discussed. A review of permits and approvals necessary for the initial development of Beluga Coal Field is presented. Major land tenure issues in the Beluga Coal District as well as existing transportation routes and proposed routes and sites are discussed. The various coal technologies which might be employed at Beluga are described. Transportation options and associated costs of transporting coal from the mine site area to a connecting point with a major, longer distance transportation made and of transporting coal both within and outside (exportation) the state are discussed. Some environmental issues involved in the development of the Beluga Coal Field are presented. (DMC)

  10. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  11. Assessment of PCDD/F and PBDD/F Emissions from Coal-fired Power Plants during Injection of Brominated Activated Carbon for Mercury Control

    Science.gov (United States)

    The effect of the injection of brominated powdered activated carbon (Br-PAC) on the emission of brominated and chlorinated dioxins and furans in coal combustion flue gas has been evaluated. The tests were performed at two U.S. Department of Energy (DOE) demonstration sites where ...

  12. The fate of injectant coal in blast furnaces: The origin of extractable materials of high molecular mass in blast furnace carryover dusts

    Energy Technology Data Exchange (ETDEWEB)

    Dong, S.N.; Wu, L.; Paterson, N.; Herod, A.A.; Dugwell, D.R.; Kandiyoti, R. [University of London Imperial College of Science & Technology, London (United Kingdom). Dept. of Chemical Engineering

    2005-07-01

    The aim of the work was to investigate the fate of injectant coal in blast furnaces and the origin of extractable materials in blast furnace carryover dusts. Two sets of samples including injectant coal and the corresponding carryover dusts from a full sized blast furnace and a pilot scale rig have been examined. The samples were extracted using 1-methyl-2-pyrrolidinone (NMP) solvent and the extracts studied by size exclusion chromatography (SEC). The blast furnace carryover dust extracts contained high molecular weight carbonaceous material, of apparent mass corresponding to 10{sup 7}-10{sup 8} u, by polystyrene calibration. In contrast, the feed coke and char prepared in a wire mesh reactor under high temperature conditions did not give any extractable material. Meanwhile, controlled combustion experiments in a high-pressure wire mesh reactor suggest that the extent of combustion of injectant coal in the blast furnace tuyeres and raceways is limited by time of exposure and very low oxygen concentration. It is thus likely that the extractable, soot-like material in the blast furnace dust originated in tars is released by the injectant coal. Our results suggest that the unburned tars were thermally altered during the upward path within the furnace, giving rise to the formation of heavy molecular weight (soot-like) materials.

  13. Clean Coal Technology Demonstration Program: Project fact sheets 2000, status as of June 30, 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The Clean Coal Technology Demonstration Program (CCT Program), a model of government and industry cooperation, responds to the Department of Energy's (DOE) mission to foster a secure and reliable energy system that is environmentally and economically sustainable. The CCT Program represents an investment of over $5.2 billion in advanced coal-based technology, with industry and state governments providing an unprecedented 66 percent of the funding. With 26 of the 38 active projects having completed operations, the CCT Program has yielded clean coal technologies (CCTs) that are capable of meeting existing and emerging environmental regulations and competing in a deregulated electric power marketplace. The CCT Program is providing a portfolio of technologies that will assure that U.S. recoverable coal reserves of 274 billion tons can continue to supply the nation's energy needs economically and in an environmentally sound manner. As the nation embarks on a new millennium, many of the clean coal technologies have realized commercial application. Industry stands ready to respond to the energy and environmental demands of the 21st century, both domestically and internationally, For existing power plants, there are cost-effective environmental control devices to control sulfur dioxide (S02), nitrogen oxides (NO,), and particulate matter (PM). Also ready is a new generation of technologies that can produce electricity and other commodities, such as steam and synthetic gas, and provide efficiencies and environmental performance responsive to global climate change concerns. The CCT Program took a pollution prevention approach as well, demonstrating technologies that remove pollutants or their precursors from coal-based fuels before combustion. Finally, new technologies were introduced into the major coal-based industries, such as steel production, to enhance environmental performance. Thanks in part to the CCT Program, coal--abundant, secure, and economical

  14. Modelling of limestone injection for SO2 capture in a coal fired utility boiler

    International Nuclear Information System (INIS)

    Kovacik, G.J.; Reid, K.; McDonald, M.M.; Knill, K.

    1997-01-01

    A computer model was developed for simulating furnace sorbent injection for SO 2 capture in a full scale utility boiler using TASCFlow TM computational fluid dynamics (CFD) software. The model makes use of a computational grid of the superheater section of a tangentially fired utility boiler. The computer simulations are three dimensional so that the temperature and residence time distribution in the boiler could be realistically represented. Results of calculations of simulated sulphur capture performance of limestone injection in a typical utility boiler operation were presented

  15. Groundwater and underground coal gasification in Alberta

    International Nuclear Information System (INIS)

    Haluszka, A.; MacMillan, G.; Maev, S.

    2010-01-01

    Underground coal gasification has potential in Alberta. This presentation provided background information on underground coal gasification and discussed groundwater and the Laurus Energy demonstration project. A multi-disciplined approach to project assessment was described with particular reference to geologic and hydrogeologic setting; geologic mapping; and a hydrogeologic numerical model. Underground coal gasification involves the conversion of coal into synthesis gas or syngas. It can be applied to mined coal at the surface or applied to non-mined coal seams using injection and production wells. Underground coal gasification can effect groundwater as the rate of water influx into the coal seams influences the quality and composition of the syngas. Byproducts created include heat as well as water with dissolved concentrations of ammonia, phenols, salts, polyaromatic hydrocarbons, and liquid organic products from the pyrolysis of coal. A process overview of underground coal gasification was also illustrated. It was concluded that underground coal gasification has the potential in Alberta and risks to groundwater could be minimized by a properly designed project. refs., figs.

  16. FY 2000 Feasibility study on the environmentally-friendly coal utilization systems as part of the international project for coal utilization measures. Feasibility study on supporting introduction of the environmentally-friendly coal utilization systems in Vietnam (Model project for introduction of advanced coal preparation systems); 2000 nendo kokusai sekitan riyo taisaku jigyo chosa hokokusho. Kankyo chowagata sekitan riyo system kanosei chosa jigyo Vietnam ni okeru kankyo chowagata sekitan riyo system donyu shien jigyo (kodo sentan system donyu model jigyo kanosei chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    The feasibility study was conducted on a model project in Vietnam, aimed at solving the environmental pollution problems resulting from use of coal by demonstrating and disseminating the Japan's environmental technologies in the Southeast Asian countries. The feasibility study was conducted for the Cua Ong Coal Preparation Enterprise, which has the largest coal preparation capacity in Vietnam and port facilities. It is treating raw coal from 10 coal mines for classification and preparation, and shipping coal of various types that meet the standards for domestic use and export. The survey results point out that unrecovered coal remains in waste water discharged from the coal preparation plants to pollute the sea area, and that quantity of the refuse increases because of the unrecovered coal it contains. The environmental technologies needed to introduce include modification to variable wave pattern type jigging separator, refuse height measuring instrument and automatic controller, circulating heavy medium gravimeter, highly functional settling pond, and flocculent facilities. (NEDO)

  17. Case history of a successful CO{sub 2} miscible gas WAG injection project

    Energy Technology Data Exchange (ETDEWEB)

    Harpole, Ken

    1998-07-01

    A successful fieldwide CO{sub 2} miscible gas injection project has been underway at the East Vacuum Grayburg San Andres Unit (EVGSAU) in eastern New Mexico, USA since 1985. This presentation follows the evolution of CO{sub 2} miscible gas WAG injection operations at EVGSAU and discusses some of the significant changes in reservoir strategy management which have been implemented over the past 13 years. These changes parallel the evolution in the industry's understanding of and experience with CO{sub 2} miscible gs injection processes. The operating problems and reservoir management challenges encountered at East Vacuum - injection performance, sweep efficiency, effective management of WAG operations, rapidly changing requirements for handling produced gas, and maintaining efficient utilization of injected CO{sub 2} - reflect the kinds of challenges typically encountered in managing a large CO{sub 2} injection project. 1 fig., 1 tab.

  18. THE OHIO RIVER VALLEY CO2 STORAGE PROJECT - PRELIMINARY ASSESSMENT OF DEEP SALINE RESERVOIRS AND COAL SEAMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Mudd; Howard Johnson; Charles Christopher; T.S. Ramakrishnan, Ph.D.

    2003-08-01

    This report describes the geologic setting for the Deep Saline Reservoirs and Coal Seams in the Ohio River Valley CO{sub 2} Storage Project area. The object of the current project is to site and design a CO{sub 2} injection facility. A location near New Haven, WV, has been selected for the project. To assess geologic storage reservoirs at the site, regional and site-specific geology were reviewed. Geologic reports, deep well logs, hydraulic tests, and geologic maps were reviewed for the area. Only one well within 25 miles of the site penetrates the deeper sedimentary rocks, so there is a large amount of uncertainty regarding the deep geology at the site. New Haven is located along the Ohio River on the border of West Virginia and Ohio. Topography in the area is flat in the river valley but rugged away from the Ohio River floodplain. The Ohio River Valley incises 50-100 ft into bedrock in the area. The area of interest lies within the Appalachian Plateau, on the western edge of the Appalachian Mountain chain. Within the Appalachian Basin, sedimentary rocks are 3,000 to 20,000 ft deep and slope toward the southeast. The rock formations consist of alternating layers of shale, limestone, dolomite, and sandstone overlying dense metamorphic continental shield rocks. The Rome Trough is the major structural feature in the area, and there may be some faults associated with the trough in the Ohio-West Virginia Hinge Zone. The area has a low earthquake hazard with few historical earthquakes. Target injection reservoirs include the basal sandstone/Lower Maryville and the Rose Run Sandstone. The basal sandstone is an informal name for sandstones that overlie metamorphic shield rock. Regional geology indicates that the unit is at a depth of approximately 9,100 ft below the surface at the project site and associated with the Maryville Formation. Overall thickness appears to be 50-100 ft. The Rose Run Sandstone is another potential reservoir. The unit is located approximately 1

  19. Application for Underground Injection Control Permit for the PUNA Geothermal Venture Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-06-01

    Puna Geothermal Venture (PGV) plans to construct and operate the 25 MW Puna Geothermal Venture Project in the Puna District of the Island of Hawaii. The project will drill geothermal wells within a dedicated 500-acre project area, use the produced geothermal fluid to generate electricity for sale to the Hawaii Electric Light Company for use on the Island of Hawaii, and inject all the produced geothermal fluids back into the geothermal reservoir. Since the project will use injection wells, it will require an Underground Injection Control (UIC) permit from the Drinking Water Section of the State of Hawaii Department of Health. The PGV Project is consistent with the State and County of Hawaii's stated objectives of providing energy self-sufficiency and diversifying Hawaii's economic base. The project will develop a new alternate energy source as well as provide additional information about the nature of the geothermal resource.

  20. Joint verification project on environmentally friendly coal utilization systems. Joint verification project on the water-saving coal preparation system; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In this verification project, clean technology which should be spread in China was verified and the base structure for its spread was prepared for the purpose of controlling emissions of environmental pollutants associated with the coal utilization in China and of contributing to secure energy acquisition of Japan. As joint verification projects, a general rehabilitation type coal preparation system was installed in the Wangfenggang coal preparation plant, and a central control coal preparation system was installed in the Qingtan coal preparation plant. In the former, a system is verified in which optimum operation, water-saving, high quality, and heightening of efficiency can be obtained by introducing two computing systems for operation control and quality control, various measuring instruments, and analyzers to coal preparation plants where analog operation is conducted helped by Russia and Porland and have problems about quality control. In the latter, a central control system achieving water saving is verified by introducing rapid ash meters, scales, desitometers and computers to coal preparation plants having zigzag or heavy-fluid cyclon and connecting various kinds of information through network. For fiscal 1994, investigation and study were conducted. 51 figs., 9 tabs.

  1. The Tactics of Persuasion: Environmental negotiations over a corporate coal project in coastal India

    International Nuclear Information System (INIS)

    Kohli, Kanchi; Menon, Manju

    2016-01-01

    Following the earthquake of 2001 in the Kutch district of Gujarat (India), the state government and corporate investors have focussed on the coastal areas of Kutch, India's largest district, for economic and infrastructure development. Within a decade of industrialisation of this landscape, these projects have had profound impacts on the environment, livelihoods and futures of its Kutchi inhabitants. Today, the coastline between the old Kandla and Mundra ports is drawn into a three-way battle between International Financial Institutions (IFIs) investing in coal projects, technical experts of sustainable development and international anti-coal campaigners. These three groups have selectively engaged the project affected Kutchis on the importance of economic development, environmental management and climate change. But the affected local people comprising artisanal fisherfolk who belong to a minority community, economically powerful salt and agricultural farmers and a traditional pastoral community of camel herders, frame, debate and act upon the impacts of the project in pragmatic ways. The range of remedies sought by them can be located between the practical expediency of everyday life and ethical questions about correct action. These remedies offer a glimpse of what regulatory bodies should be paying attention to rather than abstract or procedural justice. - Highlights: • The Bhuj earthquake of 2001 lead to the economic reshaping of Kutch. • Coal based imports, transportation and power generation has undermined local livelihood and ecology. • Without remedies, affected people are drawn into corporate patronage relations. • Impacts need to be addressed soon, close to the site, and with local involvement. • If embedded in the locality, energy regulation can become mutually beneficial.

  2. Performance indicators for water injections projects; Indicadores de desempenho para projetos de injecao de agua

    Energy Technology Data Exchange (ETDEWEB)

    Hastenreiter, Livia; Correa, Antonio C. de F.; Mendes, Roberta A. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Currently, the water injection process into oil reservoirs is the method of secondary recovery more important to increase the recovery factor. Thus, it is necessary an efficient project management, with constant data acquisitions and interpretation. This paper aims to present some indicators to evaluate the performance of water injection projects. Each indicator is presented based on a methodology that transforms the data collected in information. The results are expressed in graphical form for better viewing of the indicators measurement. (author)

  3. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  4. Preliminary project definition for long duration. Tests of coal fired MHD generators

    International Nuclear Information System (INIS)

    Van der Laken, R.A.

    1992-01-01

    In its final report the Faraday Working Group recommended the CEC amongst others to explore the possibility of a long duration test of a 'state-of-the-art', MHD-generator in order to remove uncertainties concerning the lifetime and availability of such a generator design. The duration of the test should be several thousands of hours, considerably more than the duration tests carried out until now. The scope of the present study is to prepare a project definition document for a long duration test of a coal fired, state-of-the-art MHD-generator

  5. Report on the achievements in the Sunshine Project in fiscal 1993 on development of a jet flow bed gasification electric power plant. Investigative research on a technology to treat coals used for coal gasification (investigation for coal type selection); 1993 nendo funryusho gas ka hatsuden plant kaihatsu seika hokokusho. Sekitan gas kayotan no shori gijutsu ni kansuru chosa kenkyu (tanshu sentei chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1984-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1993 in the investigation for coal type selection. The investigation is purposed to elucidate the status of existence and resources of coals as the raw material for coal gasification and liquefaction, the coal quality features, and the gasification and liquefaction characteristics. The results will be used as the fundamental materials for technological development. Discussions will also be given on the coal applicability to the composite gasification power generation system in which liquefied residue generated in the process are mixed with the supplied coal. Coal quality analysis and a liquefaction test under the standard condition were completed on 389 test samples composed of 136 kinds of coals produced in Canada, Australia, the U.S.A., China and Indonesia. Coal types were enumerated according to the oil yield. A gasification test was performed on the specific gravity separated coals of Chinese coals to discuss the effect of change in the ash amount on the gasification characteristics. A partial coal combustion test revealed that fuel ratio, oxygen partial pressure, and oxygen molar fraction parameters affect the combustion characteristics. The micro-gravity field is effective in discussing the combustion characteristics of particulate groups of dust coal. A coal oxidizing test was performed, wherein oxidizing characteristics and spontaneous ignition performance were estimated successfully from temperature rise of heat stored in coal. The coal type matrix data were prepared. (NEDO)

  6. Strengthening national coal transitions to raise climate ambition. Issue Brief. Part of the 'Coal Transitions: Research and Dialogue on the Future of Coal' Project

    International Nuclear Information System (INIS)

    Sartor, Oliver

    2017-11-01

    The issue of coal transitions is coming into focus in both national and international climate policy discussions. There are several drivers of this. At one level, the Paris Agreement marked a significant shift in the pace, scope and ambition of global climate change mitigation action. Consequently, it is now clear that coal will need to play a more and more diminished role in the global energy mix in the coming decades, despite carbon capture and storage (CCS) technologies. It is also increasingly clear that non-climate policy-related factors, such as rapid declines in the cost of renewable energy and battery storage, will continue to challenge the previously strong role of steam coal in the global energy mix (Randall, 2015). The business-as-usual scenario is therefore evolving quickly and the downside risks to coal demand appear to be increasing. The accumulation of these factors has in turn led to a call for an assurance of 'just transition', especially from stakeholders-notably coal sector workers and their communities-whose economic livelihoods depend on the future of an industry that will be in decline. In this context, parties to the UNFCCC will be called upon via the Facilitative Dialogue of 2018 to re-evaluate the adequacy progress and subsequently to revise their levels of ambition in their nationally determined contributions (NDCs). This moment presents an important opportunity for governments to raise the overall ambition of their policies on coal transition. But how should they do this? (author)

  7. Fiscal 1998 engineer interchange project on the engineer interchange project (coal mine technology field), international interchange project. Preliminary study in Russia; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Russia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the engineer interchange project (coal mine technology field), field survey for collecting information was made on the level and trend of production technology through visits to some coal industry organizations by specialists in Russia which is one candidate for the engineer training project by sending and receiving. Although coal is positioned as an important energy resource in Russia, poor business performance and a decrease in production are reported because of privatization and cur off of subsidies during a transfer period to a market economy. In addition, severe environment surrounding the Russian coal industry such as a delay of facility renewal due to poor funds, overage facilities, and moral reduction of workers due to a rationing delay has a potential for further reduction of production. The research group thus surveyed the current state of the Russian coal industry such as actual production structures, actual coal mines, technical levels, and various problem points in Moscow and Baykal districts. (NEDO)

  8. Full scale calcium bromide injection with subsequent mercury oxidation and removal within wet flue gas desulphurization system: Experience at a 700 MW coal-fired power facility

    Science.gov (United States)

    Berry, Mark Simpson

    The Environmental Protection Agency promulgated the Mercury and Air Toxics Standards rule, which requires that existing power plants reduce mercury emissions to meet an emission rate of 1.2 lb/TBtu on a 30-day rolling average and that new plants meet a 0.0002 lb/GWHr emission rate. This translates to mercury removals greater than 90% for existing units and greater than 99% for new units. Current state-of-the-art technology for the control of mercury emissions uses activated carbon injected upstream of a fabric filter, a costly proposition. For example, a fabric filter, if not already available, would require a 200M capital investment for a 700 MW size unit. A lower-cost option involves the injection of activated carbon into an existing cold-side electrostatic precipitator. Both options would incur the cost of activated carbon, upwards of 3M per year. The combination of selective catalytic reduction (SCR) reactors and wet flue gas desulphurization (wet FGD) systems have demonstrated the ability to substantially reduce mercury emissions, especially at units that burn coals containing sufficient halogens. Halogens are necessary for transforming elemental mercury to oxidized mercury, which is water-soluble. Plants burning halogen-deficient coals such as Power River Basin (PRB) coals currently have no alternative but to install activated carbon-based approaches to control mercury emissions. This research consisted of investigating calcium bromide addition onto PRB coal as a method of increasing flue gas halogen concentration. The treated coal was combusted in a 700 MW boiler and the subsequent treated flue gas was introduced into a wet FGD. Short-term parametric and an 83-day longer-term tests were completed to determine the ability of calcium bromine to oxidize mercury and to study the removal of the mercury in a wet FGD. The research goal was to show that calcium bromine addition to PRB coal was a viable approach for meeting the Mercury and Air Toxics Standards rule

  9. Venezuelan coal

    International Nuclear Information System (INIS)

    Vazquez, L.U.

    1991-01-01

    The existence of coal deposits in Venezuela has been known since the early nineteenth century, when the Naricual Mines were discovered in the State of Anzoategui Eastern Venezuela. Through the years the Venezuelan coal business had its ups and downs, but it was not until 1988 that we could properly say that our coal began to play a role in the international market. This paper reports that it is only now, in the nineties, that Venezuelan coal projects have come under a planning, promotional and developmental policy preparing the ground for the great projects Venezuela will have in the not-too-distant future

  10. Joint European project on underground coal gasification in Spain; Proyecto europeo conjunto de gasificacion subterranea de carbon en Espana

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, J.M.; Obis, A.; Menendez, E.; Albeniz, M.A.; Chandelle, V.; Mostade, M.; Bailey, A.C. [ITGE, Madrid (Spain)

    1992-09-01

    Organizations from Spain, Belgium and the United Kingdom are collaborating in a field test of underground coal gasification which is being implemented in the north of Teruel Province (Spain). The test is first phase of a European development programme on in-situ coal gasification, being carried out with financial help from the Commission of the European Communities. This paper covers a forecast of the future energy demand for Europe, the potential of in-situ coal gasification, and a summary of the recent development of in-situ coal gasification. The circumstances which led to the formation of a European organisation (UEE) which will implement the project are described, and its objectives are presented. The geological characteristics of the proposed region are detailed, together with the test programme, and its successive phases in realising the principle parameters of the operations.

  11. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  12. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  13. Japan's New Sunshine Project. 1994 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This paper summarizes the report for fiscal 1994 on research and development related to coal liquefaction and gasification. In the research and development of coal liquefaction technologies, reports were given on research of liquefaction characteristics of different coals and liquefaction process thereof, and on research of catalysts for the coal liquefaction. In the research and development of coal gasification technologies, reports were given on fundamental studies on gasification characteristics of different coals. In the research and development of liquefaction technologies for bituminous coal, reports were given on design, construction and operation of a bituminous coal liquefaction pilot plant with a capacity of 150 t/d, and the operation supporting studies on the pilot plant. In the fundamental research on the coal liquefaction process, reports were given on refining technologies and utilization of the refined materials, and studies on environment preservation in applying the coal liquefaction technologies. In the research on hydrogen manufacturing technologies by using the fundamental coal technology, reports were given on design, construction and operational studies of a pilot plant. In the research and development of the coal gasification technologies, reports were given on development of a jet-flow gasified coal electric power plant, selection of coals, and development of a data processing system. (NEDO)

  14. Japan's New Sunshine Project. 1994 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This paper summarizes the report for fiscal 1994 on research and development related to coal liquefaction and gasification. In the research and development of coal liquefaction technologies, reports were given on research of liquefaction characteristics of different coals and liquefaction process thereof, and on research of catalysts for the coal liquefaction. In the research and development of coal gasification technologies, reports were given on fundamental studies on gasification characteristics of different coals. In the research and development of liquefaction technologies for bituminous coal, reports were given on design, construction and operation of a bituminous coal liquefaction pilot plant with a capacity of 150 t/d, and the operation supporting studies on the pilot plant. In the fundamental research on the coal liquefaction process, reports were given on refining technologies and utilization of the refined materials, and studies on environment preservation in applying the coal liquefaction technologies. In the research on hydrogen manufacturing technologies by using the fundamental coal technology, reports were given on design, construction and operational studies of a pilot plant. In the research and development of the coal gasification technologies, reports were given on development of a jet-flow gasified coal electric power plant, selection of coals, and development of a data processing system. (NEDO)

  15. A collaborative project on the effects of coal quality on NO{sub x} emissions and carbon burnout in pulverised coal-fired utility boilers

    Energy Technology Data Exchange (ETDEWEB)

    Tilley, H.A.; O`Connor, M.; Stephenson, P.L.; Whitehouse, M.; Richards, D.G.; Hesselmann, G.; MacPhail, J.; Lockwood, F.C.; Williamson, J.; Williams, A.; Pourkashanian, M. [ETSU, Harwell (United Kingdom)

    1998-12-01

    This paper describes a UK Department of Trade and Industry-supported collaborative project entitled `The Effects of Coal Quality on Emission of Oxides of Nitrogen (NO{sub x}) and Carbon Burnout in Pulverised Coal-fired Utility Boilers`. The project involved extensive collaboration between the UK power generators, boiler and burner manufacturers and research groups in both industry and academia, together with several of the world`s leading computational fluid dynamics (CFD) `software houses`. The prime objectives of the project were to assess the relationship between NO{sub x} emissions and carbon burnout and to develop and validate predictive tools for assessing coals. Experimental work was carried out on various laboratory-scale apparatus and on single burner test facilities ranging from 160 kW{sub th} to 40 MW{sub th} in size and measurements were obtained from full-scale 500 MW{sub e} utility boiler trials. This data and basic coal data were then used to develop mathematical models to predict full-scale boiler performance with respect to NO{sub x} emissions and carbon-in-ash. Results showed good correlations for NO{sub x} and carbon burnout when comparing data from full-scale and large-scale rig trials. Laboratory-scale tests were found to be useful but the influence of burner aerodynamics was more difficult to quantify. Modelling showed that predicted NO{sub x} emissions were encouragingly close to measured emissions but predicting carbon burnout was less successful. 24 refs., 4 figs., 6 tabs.

  16. Japan`s New Sunshine Project. 1996 Annual Summary of Coal Liquefaction and Gasification; 1996 nendo new sunshine keikaku seika hokokusho gaiyoshu. Sekitan no ekika gasuka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    In reference to the results of the research and development under the fiscal 1996 New Sunshine Project, a report was summed up on coal liquefaction and coal gasification. As to the R and D of coal liquefaction technology, researches were conducted on liquefaction characteristics and engineering properties by coal kind, catalysts for coal liquefaction, liquefaction reaction of coal and reformation utilization of the liquefied products, liquefaction reaction mechanism and coking mechanism, solubility of coal in solvent and catalytic reaction mechanism, solvent reaction mechanism by hydrogen donor solvent, etc. Concerning the R and D of coal gasification technology, made were the basic study of eco-technology adaptable gasification technology and the study of coal gasification enhancing technology. Further, as to the development of bituminous coal liquefaction technology, carried out were the study in pilot plants and the support study of pilot plants. Additionally, R and D were done of the basic technology of coal liquefaction such as upgrading technology and environmentally acceptable coal liquefaction technology, and of coal hydrogasification technology. 3 refs., 81 figs., 25 tabs.

  17. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  18. Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates

    Energy Technology Data Exchange (ETDEWEB)

    Burford, D.P. [Southern Company Services, Inc., Birmingham, AL (United States)

    1997-12-31

    The Chiyoda Thoroughbred CT-121 flue gas desulfurization (FGD) process at Georgia Power`s Plant Yates completed a two year demonstration of its capabilities in late 1994 under both high- and low-particulate loading conditions. This $43 million demonstration was co-funded by Southern Company, the Electric Power Research Institute and the DOE under the auspices of the US Department of Energy`s Round II Innovative Clean Coal Technology (ICCT) program. The focus of the Yates Project was to demonstrate several cost-saving modifications to Chiyoda`s already efficient CT-121 process. These modifications included: the extensive use of fiberglass reinforced plastics (FRP) in the construction of the scrubber vessel and other associated vessels, the elimination of flue gas reheat through the use of an FRP wet chimney, and reliable operation without a spare absorber module. This paper focuses on the testing results from the last trimester of the second phase of testing (high-ash loading). Specifically, operation under elevated ash loading conditions, the effects of low- and high-sulfur coal, air toxics verification testing results and unexpected improvements in byproduct gypsum quality are discussed.

  19. ACARP Project C10059. ACARP manual of modern coal testing methods. Volume 1: The manual

    Energy Technology Data Exchange (ETDEWEB)

    Sakurovs, R.; Creelman, R.; Pohl, J.; Juniper, L. [CSIRO Energy Technology, Sydney, NSW (Australia)

    2002-07-01

    The Manual summarises the purpose, applicability, and limitations of a range of standard and modern coal testing methods that have potential to assist the coal company technologist to better evaluate coal performance. The first volume sets out the Modern Coal Testing Methods in summarised form that can be used as a quick guide to practitioners to assist in selecting the best technique to solve their problems.

  20. ACARP Project C10059. ACARP manual of modern coal testing methods. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Sakurovs, R.; Creelman, R.; Pohl, J.; Juniper, L. [CSIRO Energy Technology, Sydney, NSW (Australia)

    2002-07-01

    The Manual summarises the purpose, applicability, and limitations of a range of standard and modern coal testing methods that have potential to assist the coal company technologist to better evaluate coal performance. It is presented in two volumes. This second volume provides more detailed information regarding the methods discussed in Volume 1.

  1. Fiscal 1999 research cooperation project report. Research cooperation on coal liquefaction technology; 1999 nendo sekitan ekika gijutsu ni kansuru kenkyu kyoryoku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the fiscal 1999 research cooperation project result on coal liquefaction technology. Cooperative FS was made on coal liquefaction technology of Indonesian coal as petroleum substituting energy. To obtain the basic data necessary for the FS, study was made on the applicability of Indonesian natural minerals as catalytic materials. Promising low-cost abundant Soroako Limonite ore showed a high catalytic activity for liquefaction reaction of Banko coal, and an excellent grindability. Improved BCL process including hydrogenation process was promising for production of high-quality coal liquid superior in storage stability with less nitrogen and sulfur contents. Survey was made on the general conditions of Tanjung Enim area including South Banko coal field concerned, and the geological features and coal seam of South Banko coal field which is composed of 3 seams including coal deposits of 6.35 hundred million tons. To study the marketability of coal liquid, survey was made on the current situation of oil, oil product standards, and blendability of coal liquid. Hydrogen for the liquefaction process can be obtained by coal gasification. (NEDO)

  2. Milliken Clean Coal Technology Demonstration Project. Environmental monitoring report, July--September 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    New York State Electric and Gas Corporation (NYSEG) has installed and is presently operating a high-efficiency flue gas desulfurization (FGD) system to demonstrate innovative emissions control technology and comply with the Clean Air Act Amendments of 1990. The host facility for this demonstration project is NYSEG`s Milliken Station, in the Town of Lansing, New York. The primary objective of this project is to demonstrate a retrofit of energy-efficient SO{sub 2} and NO{sub x} control systems with minimal impact on overall plant efficiency. The demonstration project has added a forced oxidation, formic acid-enhanced wet limestone FGD system, which is expected to reduce SO{sub 2} emissions by at least 90 percent. NYSEG also made combustion modifications to each boiler and plans to demonstrate selective non-catalytic reduction (SNCR) technology on unit 1, which will reduce NO{sub x} emissions. Goals of the proposed demonstration include up to 98 percent SO{sub 2} removal efficiency while burning high-sulfur coal, 30 percent NO{sub x} reductions through combustion modifications, additional NO{sub x} reductions using SNCR technology, production of marketable commercial-grade gypsum and calcium chloride by-products to minimize solid waste disposal, and zero wastewater discharge.

  3. Report for fiscal 2000 on joint seminar for coal engineer training project; 2000 nendo sekitan gijutsusha yosei jigyo godo semina hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    This paper summarizes the contents of the joint seminar for coal engineer training project in fiscal 2000, which has been held in Tokyo on September 25, 2000. The lectures included 'Coal Resources in Gunnedah Basin - Future Coal Supply Potential and Geophysical Exploration' by Ms. Julie Ann Moloney, senior geographical engineer at NSW Department of Mineral Resources, Australia, 'Human Resources Development for Coal Mining in Indonesia' by Mr. Bangun Usman Harahap at the Ministry of Mines and Energy in Indonesia, 'Queensland Rail, a strategic partner - linking Coal Producers to World Markets' by Mr. John Stuart Burrows at Coal Queensland Rail, Australia, and 'The export coal mines of western Canada - A review' by Mr. Ron Smyth, director BC Geological Survey Branch, Ministry of Energy and Mines, British Columbia, Canada. Questions and answers were exchanged actively for these lectures. (NEDO)

  4. Report for fiscal 2000 on joint seminar for coal engineer training project; 2000 nendo sekitan gijutsusha yosei jigyo godo semina hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    This paper summarizes the contents of the joint seminar for coal engineer training project in fiscal 2000, which has been held in Tokyo on September 25, 2000. The lectures included 'Coal Resources in Gunnedah Basin - Future Coal Supply Potential and Geophysical Exploration' by Ms. Julie Ann Moloney, senior geographical engineer at NSW Department of Mineral Resources, Australia, 'Human Resources Development for Coal Mining in Indonesia' by Mr. Bangun Usman Harahap at the Ministry of Mines and Energy in Indonesia, 'Queensland Rail, a strategic partner - linking Coal Producers to World Markets' by Mr. John Stuart Burrows at Coal Queensland Rail, Australia, and 'The export coal mines of western Canada - A review' by Mr. Ron Smyth, director BC Geological Survey Branch, Ministry of Energy and Mines, British Columbia, Canada. Questions and answers were exchanged actively for these lectures. (NEDO)

  5. Report on the achievements in the Sunshine Project in fiscal 1986. Surveys on coal type selection (coal type survey); 1986 nendo tanshu sentei chosa seika hokokusho. Tanshu chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The purpose of the present study is to elucidate coal quality features of different types of coals and identify the relationship between the coal quality features and the liquefaction characteristics by performing liquefaction characteristic evaluation tests. Based on the result therefrom, a method is established for coal field assessment that can estimate yield of liquefaction in coal fields and coal mines to serve for selection of coal types suitable for liquefaction. Coal quality feature surveys and liquefaction characteristics evaluation tests under the standard conditions have been completed on 48 coal types including Canadian, Australian and American coals. Elucidating the coal quality features of different coals can specify parameters for the coal quality features related to the liquefaction characteristics. Coal ranks elucidate the vitrinite reflectance, structure constituent factors the vitrinite content, composite factors the volatile matter content, quantity of heat generation, and number of H/C and O/C atoms. Investigating the relationship between the coal quality features and the liquefaction characteristics can provide fundamental data for primary screening of raw material coals for liquefaction. The result of the liquefaction characteristics evaluation test under the standard conditions can be the detailed comparative data relative to data derived from the simplified liquefaction characteristics test that is performed to estimate liquefaction yield of specific coal field and coal mine. (NEDO)

  6. Multiscale Characterization and Quantification of Arsenic Mobilization and Attenuation During Injection of Treated Coal Seam Gas Coproduced Water into Deep Aquifers

    Science.gov (United States)

    Rathi, Bhasker; Siade, Adam J.; Donn, Michael J.; Helm, Lauren; Morris, Ryan; Davis, James A.; Berg, Michael; Prommer, Henning

    2017-12-01

    Coal seam gas production involves generation and management of large amounts of co-produced water. One of the most suitable methods of management is injection into deep aquifers. Field injection trials may be used to support the predictions of anticipated hydrological and geochemical impacts of injection. The present work employs reactive transport modeling (RTM) for a comprehensive analysis of data collected from a trial where arsenic mobilization was observed. Arsenic sorption behavior was studied through laboratory experiments, accompanied by the development of a surface complexation model (SCM). A field-scale RTM that incorporated the laboratory-derived SCM was used to simulate the data collected during the field injection trial and then to predict the long-term fate of arsenic. We propose a new practical procedure which integrates laboratory and field-scale models using a Monte Carlo type uncertainty analysis and alleviates a significant proportion of the computational effort required for predictive uncertainty quantification. The results illustrate that both arsenic desorption under alkaline conditions and pyrite oxidation have likely contributed to the arsenic mobilization that was observed during the field trial. The predictive simulations show that arsenic concentrations would likely remain very low if the potential for pyrite oxidation is minimized through complete deoxygenation of the injectant. The proposed modeling and predictive uncertainty quantification method can be implemented for a wide range of groundwater studies that investigate the risks of metal(loid) or radionuclide contamination.

  7. NEDO coal mining structure adjustment subcommittee. 18th project report meeting; NEDO sekitan kogyo kozo chosei bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Concerning the subject matter, a NEDO (New Energy and Industrial Technology Development Organization) director Keishiro Kawamo reports on NEDO's projects designed to smoothly implement the 'new coal policy'. Nobuaki Terasaka, chief of the planning division, coal and new energy department, Agency of Natural Resources and Energy, takes up the current status of the coal policy and the tasks it faces, and discusses, predicting the development of the coal policy, the assurance of stable supply of coal from abroad, development of clean coal technologies that will rightly deal with the world-wide environmental problems, and the international diffusion of the clean coal technologies and the completion of the basement therefor. Concerning the 'development of zeolite-related commodities,' a report is delivered on the manufacture of a soil improving material and a deodorant for fish grill from zeolite found rich in coal layers of Pacific Coal Mine Co., Ltd. Concerning the 'polycrystalline diamond manufacturing project,' a polycrystalline diamond synthesizing method making use of the blasting technique employed at coal mines is reported. (NEDO)

  8. Nuclear economics 2000: Deterministic and probabilistic projections of nuclear and coal electric power generation costs for the year 2000

    International Nuclear Information System (INIS)

    Williams, K.A.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1987-06-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base-load nuclear and coal-fired power plants with a startup date of January 2000. For the Midwest region a complete data set that specifies each parameter used to obtain the comparative results is supplied. When based on the reference set of input variables, the comparison of power generation costs is found to favor nuclear in most regions of the country. Nuclear power is most favored in the northeast and western regions where coal must be transported over long distances; however, coal-fired generation is most competitive in the north central region where large reserves of cheaply mineable coal exist. In several regions small changes in the reference variables could cause either option to be preferred. The reference data set reflects the better of recent electric utility construction cost experience (BE) for nuclear plants. This study assumes as its reference case a stable regulatory environment and improved planning and construction practices, resulting in nuclear plants typically built at the present BE costs. Today's BE nuclear-plant capital investment cost model is then being used as a surrogate for projected costs for the next generation of light-water reactor plants. An alternative analysis based on today's median experience (ME) nuclear-plant construction cost experience is also included. In this case, coal is favored in all ten regions, implying that typical nuclear capital investment costs must improve for nuclear to be competitive

  9. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  10. Report to Congress: Expressions of interest in commercial clean coal technology projects in foreign countries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report was prepared in response to the guidance provided by the Congress in the course of the Fiscal Year 1995 appropriations process for the Department of Energy`s (DOE) Office of Fossil Energy (FE). As described in detail below, DOE was directed to make the international dissemination of Clean Coal Technologies (CCTs) an integral part of its policy to reduce greenhouse gas emissions in developing countries. Congress directed DOE to solicit ``Statements of Interest`` in commercial projects employing CCTs in countries projected to have significant growth in greenhouse gas emissions. Additionally, DOE was asked to submit to the Congress a report that analyzes the information contained in the Statements of Interest, and that identifies the extent to which various types of Federal incentives would accelerate the commercial availability of these technologies in an international context. In response to DOE`s solicitation of 18 November 1994, 77 Statements of Interest were received from 33 companies, as well as five additional materials. The contents of these submittals, including the requested Federal incentives, the CCTs proposed, the possible host countries, and the environmental aspects of the Statements of Interest, are described and analyzed in the chapters that follow.

  11. Technical support to the Solvent Refined Coal (SRC) demonstration projects: assessment of current research and development

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, M.S.; Rodgers, B.R.; Brown, C.H.; Carlson, P.K.; Gambill, W.R.; Gilliam, T.M.; Holmes, J.M.; Krishnan, R.P.; Parsly, L.F.

    1980-12-01

    A program to demonstrate Solvent Refined Coal (SRC) technology has been initiated by the US Department of Energy (DOE) in partnership with two industrial groups. Project management responsibility has been assigned to the Oak Ridge Operations Office (ORO) of DOE. ORO requested that the Oak Ridge National Laboratory assess current research and development (R and D) activities and develop recommendations for those activities that might contribute to successful completion of the SRC demonstration plant projects. The objectives of this final report are to discuss in detail the problem areas in SRC; to discuss the current and planned R and D investigations relevant to the problems identified; and to suggest appropriate R and D activities in support of designs for the SRC demonstration plants. Four types of R and D activities are suggested: continuation of present and planned activities; coordination of activities and results, present and proposed; extension/redirection of activities not involving major equipment purchase or modifications; and new activities. Important examples of the first type of activity include continuation of fired heater, slurry rheology, and slurry mixing studies at Ft. Lewis. Among the second type of activity, coordination of data acquisition and interpretation is recommended in the areas of heat transfer, vapor/liquid equilibria, and physical properties. Principal examples of recommendations for extension/redirection include screening studies at laboratory scale on the use of carbonaceous precoat (e.g., anthracite) infiltration, and 15- to 30-day continuous tests of the Texaco gasifier at the Texaco Montebello facility (using SRC residues).

  12. Fiscal 1999 report on results of joint demonstrative project for environmentally benign coal utilization system. Demonstrative project concerning coal preparation technology (China); 1999 nendo kankyo chowagata sekitan riyo system kyodo jissho jigyo seika hokokusho. Sentan gijutsu ni kakawaru jissho jigyo (Chugoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper describes the demonstrative project for coal preparation technology, as a part of the measures against environmental pollution due to the structuring of demonstration and dissemination basis for clean coal technologies in China, The results for fiscal 1999 is reported. In the utilization of coal in China, a problem of urgency is the highly efficient selection and removal of sulfur contents in raw coal. Coal production in Chongquing City is yearly 30 million tons, of which 90% contains sulfur contents of 3% or higher. At Jinjia Colliery of Panjiang Coal and Electric Co. Ltd., Guizhou Province, a site for the present project, a number of coal seams are unsuitable for single utilization because of high sulfur contents. The coal preparation technologies to be introduced are expected to improve coal preparation efficiency and desulfurization ratio in terms of both the washability of raw coal and the accuracy of the coal washer. This is the third year of the project, with the following activities performed, namely, research/design, manufacturing/procurement of equipment, design for construction work, training of operators or the like, and documentation. The manufacturing and procurement are for such equipment as vacuum disk filter with accessories, waste water thickener, pressure filter for tailings with accessories, flocculant pump/piping, slurry tank/pump, high-shear mixer with accessories, and electric instrumentation. All the equipment arrived at the site in January, 2001. (NEDO)

  13. Technical engineers exchange project (coal mine technology field). Training in China; Gijutsusha koryu jigyo (tanko gijutsu bun`ya). Chugoku no kenshu ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Adachi, T. [Japan Coal Energy Center, Tokyo (Japan)

    1998-07-01

    The paper described JCOAL`s project on the exchange of technical coal engineers of China. In the project on sending of engineers to China in the first term, coal mine engineers of Japan (Taiheiyo Coal Mine, Kushiro Works, Training Center) were sent to the Daitun coal-thermal power plant, Peixuan city, Jiangsu province, in September, 1997 to introduce the production control technology in Japan. They contributed to the heightening of productivity in coal mines in China. Eighteen Chinese participated in the training. Mechanization has been comparatively well in progress, and it was 83% in coal mining and 91% in drilling. The kind of coal is mostly a raw material coal. The stuff members are 30,000, and expert engineers are 4,200. The plant has an output of 130,000 kWh, owns its railroad, is run on the general multiple management, and is largely developing. The project on sending of engineers to China in the last term was carried out in February 1998 for tracing/confirming how the results of the training conducted in September are made the most of and if or not there is something bad and for obtaining the detailed data. A certain degree of promotion and effects were able to be confirmed. A project on training of the head, sub-head, etc. who were invited to Japan to lean production/management control was also carried out in November and December 1997. 1 tab.

  14. Influencing factors of public support for modern coal-fired power plant projects: An empirical study from China

    International Nuclear Information System (INIS)

    Liu, Feng; Lyu, Tao; Pan, Li; Wang, Fei

    2017-01-01

    With the development of clean coal technology, modern coal-fired power plants have achieved the similar emission standards as gas power plants. However, due to the impressions of high pollution and high emission in traditional coal-fired power plants, such projects are often opposed by local residents, which hinder the promotion of this technology. This manuscript aims to investigate public attitudes toward these projects and to analyze the influencing mechanisms of the factors of public support. The conceptual model was built with sense of place, trust and environmental attitude as the independent variables, benefit and cost perceptions as the mediating variables and public support as the dependent variable. The model was tested and modified by structural equation modelling. The results revealed that sense of place had a slight indirect impact (−0.043) on public support through benefit perception, whereas trust had a direct impact (0.332) on public support and indirect impacts (0.298) through benefit and cost perceptions. Environmental attitude had indirect impacts on public support through benefit perception (0.180) and cost perception (−0.115). In addition, policy suggestions on decision-making, project publicity and compensation strategy are proposed to enhance public support for similar projects. - Highlights: • This manuscript aims at eliminating the NIMBY effects on modern coal-fired power plant project. • A SEM model is proposed to explore how potential factors affect public support. • Trust is the dominant influencing factor to improve public support with both direct and indirect impacts. • Environmental attitude can also have positive effect on public support through rational compensation plans.

  15. Mechanization of operations in underground workings in coal mines and research project trends. [Poland

    Energy Technology Data Exchange (ETDEWEB)

    Reich, K; Skoczynski, W; Sikora, W

    1985-01-01

    Structure of black coal reserves of Poland, imported and Polish made equipment for underground mining, prospects for mechanization of selected operations in underground mines and research programs of the KOMAG Center for Mechanization of Mining are evaluated. Prospects for longwall mining with caving or stowing in thick coal seams (slice mining), thin (0.8 to 1.2 m), level or inclined coal seams and steep seams are analyzed. The following equipment for mechanization of underground mining is evaluated: integrated face systems, shearer loaders, chain conveyors, belt conveyors, coal plows, equipment for mine drivage, hoists, drive systems for mining equipment. The following research programs of the KOMAG Center are reviewed: modernization of face systems for coal seams with uncomplicated mining conditions, development of equipment for thin seam mining, development of types of mining equipment for coal seams from 1.5 to 3.0 m thick with dip angles to 25 degrees, modernization of equipment for thick seam mining, increasing efficiency of mine drivage (new types of heading machines, materials handling equipment for mine drivage), mechanization of auxiliary operations in underground coal mines, improving quality of mining equipment, development of equipment for coal preparation, increasing occupational safety in underground mining.

  16. Fiscal 1995 survey report on the environmentally friendly type coal utilization system joint demonstration project. Water-saving coal preparation system joint demonstration project; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This project makes demonstration of clean coal technology (CCT) in China and preparation for the base of its spread, controlled environmental pollution due to the coal use by the countries concerned, and contributes to stably secure energy of Japan. The paper made analog operation in the 1960s-1970s, supported by Russia and Poland, introduced two computer systems for operational control and quality control, densimeter, level meter, flow meter and analyzer to coal preparation plants having problems on productivity and quality control, made the optimum operational diagnosis for the plants, and at the same time, demonstrated the comprehensive rehabilitation type system by which water saving, high quality and high effectiveness are obtained. Various types of sensors such as rapid ash meter, scale and densitometer and computers are introduced to coal preparation plants which were recently constructed in China, have jig or heavy liquid cyclone as main preparation equipment and conducts operational control. There, the central control system was demonstrated in which various information collected in the central operation room and in-site equipment is combined by network for high-grade data processing and water saving is achieved. 50 figs., 11 tabs.

  17. Grey relation projection model for evaluating permafrost environment in the Muli coal mining area, China

    Energy Technology Data Exchange (ETDEWEB)

    Wei Cao; Yu Sheng; Yinghong Qin; Jing Li; Jichun Wu [Chinese Academy of Sciences, Lanzhou (China). State Key Laboratory of Frozen Soil Engineering

    2010-12-15

    This study attempts to estimate the current stage of the permafrost environment in the Muli coal mining area, an opencast mining site in the Qinghai-Tibet plateau, China. The estimation is done by regarding this site's permafrost environment as a system which was divided into three subsystems consisting of permafrost freeze-thaw erosion sensibility, permafrost thermal stability, and permafrost ecological fragility. The subsystems were characterized with their influencing indicators, each of which was assigned with a weight according to analytic hierarchy process. The relationship between these indictors is established using an environmental evaluation model based on grey system theory. The evaluated results show that currently the normalised grey relation projection values (GRPV) of permafrost freezing-thawing erosion sensibility, permafrost thermal stability, permafrost ecological fragility and permafrost environment are 0.58 (general situation), 0.47 (bad situation), 0.63 (general situation) and 0.56 (general situation), respectively. These values imply that the permafrost environment has been deteriorated to a certain degree by human activities and potentially could be further degraded. However, at this degree, a new equilibrium could be achieved if the current environmental degradation ratio is held and if effective treatments are constructed against further damages.

  18. Report on the coal group in the Sunshine Project in fiscal 1988. Studies on a coal treatment technology in the initial process in liquefaction; 1989 nendo ekika shoki kotei ni okeru sekitan shori gijutsu no kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    This paper reports the achievements in the Sunshine Project in fiscal 1988 in studies on the studies of the initial process in liquefaction. It is intended to identify the swelling phenomenon in coal particles in the coal slurry preparation and preheating processes, and change in the slurry viscosity associated with the heating. The slurry viscosity starts decreasing from around 300 degrees C at which the liquefying reaction begins, and decreases sharply at around 350 degrees C. Therefore, rise in the viscosity at temperatures below 300 degrees C is caused by factors other than the liquefying reaction. The rise starting at 100 to 120 degrees C is due to absorption of the solvent by coal. The rise starting at 210 to 260 degrees C requires further discussions. The equilibrium swelling ratio was measured on different types of coals by using the hydrogenated anthracene oil solvent. No coals swelled at 100 degrees C. The temperature of 200 degrees C largely divides coals into those swelling and those not swelling. At 300 degrees C, the coals were divided into those shrinking after largely swelling, those not swelling and those swelling monotonously. For consideration of the utilization as an auxiliary solvent, petroleum-based heavy oil was used to perform coal liquefaction to discuss effects of the solvent on the liquefaction rates. (NEDO)

  19. Project to develop and demonstrate methods to eliminate frozen coal handling problems. Status report I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-15

    For too many years, problems associated with frozen coal have plagued the companies who mine it, the companies who handle it in transit and the utilities and other industrial concerns that finally burn it. But never before has the magnitude of the frozen coal problem been as great as it is today because of two primary factors, i.e. (1) the majority of coal currently transported and used has been ground to a very fine mesh that absorbs water readily, thus providing more surface area for freezing, and (2) the substantially increased importance of coal, indeed, the now critical necessity for more coal to be used in displacing dangerously uncertain foreign oil supplies that currently account for 50 percent of our daily domestic oil consumption. Frozen coal problems can and do have a devastating effect upon the ability to provide energy from coal during harsh winter months when it is not needed. The majority of these problems have been involved with removing frozen coal from rail cars. To allay the problem, numerous techniques have been tried, all with some measure of success. As an example, certain chemicals have been sprayed on the coal; another common treatment has been widespread use of thaw sheds, which, whether electrically or gas-fired, are all energy intensive, time consuming, hard on rail equipment and expensive to operate over long periods of time. From sledge hammers and crow bars to gas-fired jets and electric thaw sheds, available mechanical de-icing methods often damage coal handling equipment, are time consuming and, therefore, very expensive when demurrage losses must be added to significant investment and/or operating costs.

  20. FY 2000 international exchange project on exchanges of engineers - Coal mine technology field. Overseas workshop (China); 2000 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Chugoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of making technical exchanges with coal mine related engineers in China and surveying levels of coal production technology and the needs in China and possibilities of technology transfer from Japan, workshop was held and technical tours were made. On December 13, 2000, a workshop was held in China which was named 'Japan-China Joint Coal Project Workshop: Environment/Production/Security.' Participants were 112 including 16 from Japan and 96 from China. Subjects were as follows: subjects on coal resource and technical strategy in the 21st century, technical exchange project and technical development, Japan-China technical cooperation project, report on the operational situation of China Coal Industry Environmental Preservation Safety Training Center, Japan-China Joint Project on spontaneous combustion prevention technology, CMG recovery/utilization system joint demonstration project, Japan-China joint coal exploration project, Japan-China coal field geology joint exploration project, etc. (NEDO)

  1. Engineer exchanging project (coal mine technology field) in fiscal 1999. International information exchanging project (advance survey on Russia); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Roshia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This advance survey on Russia has performed visiting surveys and information collection at coal related organizations inside Japan and in overseas countries on production technology levels, trends and technology exchange needs in overseas coal producing countries. The project is intended to serve for improvement in the contents of and smooth execution of the engineer exchange project in the 'coal mine technology field. It was carried out by expertise people as the site surveys and the engineer reception and exchange surveys. Because of the economic crisis that has hit Russia in 1998, unprofitable coal mines were closed one after another under the coal mine scrap and build policy under the initiative of the World Bank. This situation is giving serious impacts on coal mines in the Far East Russia and the coastal areas. However, the importance of coal as the primary energy source has not been changed at all in the Far East Russia. Thus, the areas have fallen into a situation that they must rely on a great amount of introduced and imported coals as a result of weakening in coal mines in the Far Eastern area on the other hand. This paper reports mainly the situation in which the coal industries in the coastal areas are placed, and the possibilities of technology exchange. (NEDO)

  2. Fate(s) of injected CO2 in a coal-bearing formation, Louisiana, Gulf Coast Basin: Chemical and isotopic tracers of microbial-brine-rock-CO2 interactions

    Science.gov (United States)

    Shelton, Jenna L.

    2013-01-01

    Coal beds are one of the most promising reservoirs for geologic carbon dioxide (CO₂) sequestration, as CO₂ can strongly adsorb onto organic matter and displace methane; however, little is known about the long-term fate of CO₂ sequestered in coal beds. The "2800' sand" of the Olla oil field is a coal-bearing, oil and gas-producing reservoir of the Paleocene–Eocene Wilcox Group in north-central Louisiana. In the 1980s, this field, specifically the 2800' sand, was flooded with CO₂ in an enhanced oil recovery (EOR) project, with 9.0×10⁷m³ of CO₂ remaining in the 2800' sand after injection ceased. This study utilized isotopic and geochemical tracers from co-produced natural gas, oil and brine from reservoirs located stratigraphically above, below and within the 2800' sand to determine the fate of the remaining EOR-CO₂, examining the possibilities of CO₂ migration, dissolution, mineral trapping, gas-phase trapping, and sorption to coal beds, while also testing a previous hypothesis that EOR-CO₂ may have been converted by microbes (CO₂-reducing methanogens) into methane, creating a microbial "hotspot". Reservoirs stratigraphically-comparable to the 2800' sand, but located in adjacent oil fields across a 90-km transect were sampled to investigate regional trends in gas composition, brine chemistry and microbial activity. The source field for the EOR-CO₂, the Black Lake Field, was also sampled to establish the δ¹³C-CO₂ value of the injected gas (0.9‰ +/- 0.9‰). Four samples collected from the Olla 2800' sand produced CO₂-rich gas with δ¹³C-CO₂ values (average 9.9‰) much lower than average (pre-injection) conditions (+15.9‰, average of sands located stratigraphically below the 2800' sand in the Olla Field) and at much higher CO₂ concentrations (24.9 mole %) than average (7.6 mole %, average of sands located stratigraphically below the 2800' sand in the Olla Field), suggesting the presence of EOR-CO₂ and gas-phase trapping as

  3. FY 2000 survey of the geological structure overseas, etc. Japan-China joint coal exploration - Yu Xian project; 2000 nendo kaigai chishitsu kozo nado chosa - futai shiryoshu. Nippon Chugoku sekitan kyodo tansa Yu Xian project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This data book summarized the proceedings and the technical report of the management committee on the Japan-China geological structure survey based on the consultation concluded between NEDO and China's bureau of coal field geology and a report meeting on the Yu Xian project. In the exploration, conducted were the boring survey of 10 boreholes, seismic survey of 2D (71 traverse lines, 180.105km) and 3D (1.5km{sup 2}), VSP (6 holes (345 shots)) and the low velocity band survey (2,072 shots). The geological structure of the area presented the syncline structure with a gentle line associated with foldings and a number of faults and was classified into the medium class or the class of a little complication in the Chinese standard. The number of the faults confirmed in this exploration totaled 57. Coal reserves by coal seam were 157.22 million tons at No. 5 seam and 102.57 million tons at No. 1 seam. The total amount of the two seams was 79.1% of the total coal amount in all area. The coal quality of Nos. 1 and 5 was brown coal - flame coal in the Chinese classification, and subbituminous coal B - subbituminous coal C in the ASTM classification. The coal, however, cannot be used for process raw coal. There is a technical potentiality of the fixed bed pressurized gasification. (NEDO)

  4. Fiscal 1999 engineer exchange project (field of coal mining technology), international exchange project. Domestic workshop; 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kokunai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The domestic workshop invites Japanese engineers and engineers from coal producing countries for the exchange of coal mining technologies and aims to substantiate and facilitate the dispatching and receiving of engineers under training programs. The main subject of the Asia-Pacific coal technology workshop was 'Coal for the 21st century - resources and technology,' and there were two sessions held on September 8, titled 'Trends and tasks of coal resources exploitation' and 'Coal resources and production technology.' Lectures were delivered by five overseas and five Japanese coal engineering experts. On September 9, nine essays were presented concerning 'Coal resources and security problems' and 'Coal resources and environmental problems.' In addition, a panel discussion was held, titled 'Coal resources assessment and technology.' Importance was emphasized of the correct assessment of the magnitude of resources, development of probing technologies to collect more detailed information, improvement of digging speeds applicable to faces for large and high-efficiency mining, development of coal mining technologies for increased recovery, etc. Information was exchanged on various occasions and partnership was enhanced between the participants to the advantage of engineer exchanging projects in the future. (NEDO)

  5. British Coal Compass Project summary: colliery based manpower, personnel, scheduling and safety systems and processes

    Energy Technology Data Exchange (ETDEWEB)

    Long, V. (Oasis Group PLC (United Kingdom))

    1994-01-01

    In early 1991, British Coal reviewed its existing personnel and manpower planning systems and concluded they were inadequate for the future needs of the business. With wages accounting for 40% British Coal's 1990/91 operational costs, the Corporation targeted manpower management as an area to deliver further improvements. British Coal's strategy to continue to improve productivity required payroll and personnel related systems which could support new flexible working hours and variable shifts. This strategy would enable machine running time to be increased, leading to improved productivity levels. 3 figs.

  6. The Injection System of the INFN-SuperB Factory Project: Preliminary Design

    Energy Technology Data Exchange (ETDEWEB)

    Boni, Roberto; /INFN, Rome; Guiducci, Susanna; /INFN, Rome; Preger, Miro; /INFN, Rome; Raimondi, Pantaleo; /INFN, Rome; Chance, Antoine; /Saclay; Dadoun, Olivier; /Orsay, LAL; Poirier, Freddy; /Orsay, LAL; Variola, Alessandro; /Orsay, LAL; Seeman, John; /SLAC

    2012-07-05

    The ultra high luminosity B-factory (SuperB) project of INFN requires a high performance and reliable injection system, providing electrons at 4 GeV and positrons at 7 GeV, to fulfil the very tight requirements of the collider. Due to the short beam lifetime, continuous injection of electron and positron bunches in both LER and HER rings is necessary to maintain an high average luminosity. Polarized electrons are required for experiments and must be delivered by the injection system, due to the beam lifetime shorter than the ring polarization build-up: they will be produced by means of a SLAC-SLC polarized gun. The emittance and the energy spread of the e{sup -}/e{sup +} beams are reduced in a 1 GeV Damping Ring (DR) before injection in the main rings. Two schemes for positron production are under study, one with e{sup -}/e{sup +} conversion at low energy (< 1 Gev) and one with conversion at 6 GeV and a recirculation line to bring the positrons back to the DR. Acceleration through the Linac is provided by a 2856 MHz RF system made of travelling wave (TW), room temperature accelerating structures.

  7. Converting coal

    Energy Technology Data Exchange (ETDEWEB)

    Avigliano, A. [Bedeschi (Italy)

    2006-10-15

    In September 2005, Bedeschi was commissioned to design and supply a coal unloading, conveying and storage facility for a new raw coal line system within Hatien II Cement Co. The new plant is composed of a grab unloader, a conveyor system, a storage shed with stacking and reclaiming facilities, a complete dedusting system and civil and steel structure engineering. The scope of supply includes a local fabrication portion; however, main components will be imported. The project will be completed in 21 months. The paper looks into the mechanics of loading and unloading coal. 4 figs., 4 photos.

  8. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  9. The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression

    Directory of Open Access Journals (Sweden)

    Holtam V. R.

    2006-11-01

    Full Text Available The daily oil production from the Schoonebeek Oilfield amounts to some 1400 m3 /d, of which ca. 65% is produced from a high pressure (85 bar steam injection project. This project was started in 1981 and originally consisted of 7 structurally downdip/middip steam injectors. However, following the initially somewhat disappointing project performance, steam injection was moved to 4 middip/ updip injectors in 1984. This change in the location of the steam injectors, together with an increase in the level of surveillance and a more pragmatic reservoir management policy, has resulted in improved project performance. The ultimate extra oil/steam ratio for the total project is now expected to be 0. 7 m3 oil/ton of steam injected. La production de pétrole du gisement de Schoonebeek est d'environ 1400 m3/jour, dont près de 65% sont obtenus par injection de vapeur à haute pression (85 bar. Ce projet lancé en 1981 comportait initialement 7 injecteurs de vapeur orientés vers l'aval-pendage. En raison de performances décevantes, l'injection de vapeur a été transférée en 1984 sur 4 injecteurs travaillant vers l'amont-pendage. Ce changement de position des injecteurs, accompagné d'une surveillance renforcée et d'une politique de gestion du gisement plus pragmatique, a donné des résultats favorables. On pense que le rapport pétrole/vapeur pour l'ensemble du projet devrait être en dernière analyse de 0,7 m3 de pétrole par tonne de vapeur injectée.

  10. Leaching behavior of coal combustion products and the environmental implication in road construction : project progress report.

    Science.gov (United States)

    2009-01-01

    The use of coal fly ash in road base and sub-base applications can provide better properties and performance, and is superior to it being otherwise disposed and becoming a possible environmental liability. Understanding the metal leaching behavior fo...

  11. Japan`s Sunshine Project. 1991 annual summary of coal liquefaction and gasification; 1991 nendo sunshine keikaku seika hokokusho gaiyoshu. Sekitan no ekika gas ka

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    Out of the research and development on the 1991 Sunshine Project, the results of coal liquefaction/gasification are reported. The basic research of coal liquefaction/gasification is conducted. The research plan for a 150 ton/day scale pilot plant (PP) is worked out for the development of bituminous coal liquefaction technology by NEDOL process. Data of PSU (Process Support Units) operation, especially, are studied. Concerning the data obtained through dismantling of the 50 ton/day PP in Australia which uses Australian Victoria coal due to completion of its operation and also obtained from its support research, they are reflected in the design of a demonstration plant, and the results are arranged for study. Research and development on refining technology of coal-derived liquid such as Illinois coal liquid and on application technology of its products are made. For the development of coal-use hydrogen production technology, conducted is the research of a high temperature gasification PP by entrained flow bed process which is the core of the coal gasification technology. Elementary study with a 2 ton/day furnace is made for the development of the entrained flow bed coal gasification combined cycle power generation system. Also conducted are PP construction, adjusting operation and the overall research operation.

  12. LLNL Underground-Coal-Gasification Project. Quarterly progress report, July-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, D.R.; Clements, W. (eds.)

    1981-11-09

    We have continued our laboratory studies of forward gasification in small blocks of coal mounted in 55-gal drums. A steam/oxygen mixture is fed into a small hole drilled longitudinally through the center of the block, the coal is ignited near the inlet and burns toward the outlet, and the product gases come off at the outlet. Various diagnostic measurements are made during the course of the burn, and afterward the coal block is split open so that the cavity can be examined. Development work continues on our mathematical model for the small coal block experiments. Preparations for the large block experiments at a coal outcrop in the Tono Basin of Washington State have required steadily increasing effort with the approach of the scheduled starting time for the experiments (Fall 1981). Also in preparation is the deep gasification experiment, Tono 1, planned for another site in the Tono Basin after the large block experiments have been completed. Wrap-up work continues on our previous gasification experiments in Wyoming. Results of the postburn core-drilling program Hoe Creek 3 are presented here. Since 1976 the Soviets have been granted four US patents on various aspects of the underground coal gasification process. These patents are described here, and techniques of special interest are noted. Finally, we include ten abstracts of pertinent LLNL reports and papers completed during the quarter.

  13. Safety and Acceptability of Community-Based Distribution of Injectable Contraceptives: A Pilot Project in Mozambique.

    Science.gov (United States)

    Jacinto, Ana; Mobaracaly, Mahomed Riaz; Ustáb, Momade Bay; Bique, Cassimo; Blazer, Cassandra; Weidert, Karen; Prata, Ndola

    2016-09-28

    Mozambique has witnessed a climbing total fertility rate in the last 20 years. Nearly one-third of married women have an unmet need for family planning, but the supply of family planning services is not meeting the demand. This study aimed to explore the safety and effectiveness of training 2 cadres of community health workers-traditional birth attendants (TBAs) and agentes polivalentes elementares (APEs) (polyvalent elementary health workers)-to administer the injectable contraceptive depot-medroxyprogesterone acetate (DMPA), and to provide evidence to policy makers on the feasibility of expanding community-based distribution of DMPA in areas where TBAs and APEs are present. A total of 1,432 women enrolled in the study between February 2014 and April 2015. The majority (63% to 66%) of women in the study started using contraception for the first time during the study period, and most women (over 66%) did not report side effects at the 3-month and 6-month follow-up visits. Very few (less than 0.5%) experienced morbidities at the injection site on the arm. Satisfaction with the performance of TBAs and APEs was high and improved over the study period. Overall, the project showed a high continuation rate (81.1%) after 3 injections, with TBA clients having significantly higher continuation rates than APE clients after 3 months and after 6 months. Clients' reported willingness to pay for DMPA (64%) highlights the latent demand for modern contraceptives. Given Mozambique's largely rural population and critical health care workforce shortage, community-based provision of family planning in general and of injectable contraceptives in particular, which has been shown to be safe, effective, and acceptable, is of crucial importance. This study demonstrates that community-based distribution of injectable contraceptives can provide access to family planning to a large group of women that previously had little or no access. © Jacinto et al.

  14. Fiscal 1997 technological survey report. Engineer exchange project - coal mine technological field (Advanced coal producing country survey - U.S.A. survey); 1997 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) senshin santankoku chosa. Beikoku chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    While the introduction and adaptation of the Longwall excavation technology were carried forward for coal producing countries in the Pacific region, U.S.A. information was collected by making tours of coal mines in the West and Washington/Colorado/Utah States, with the intention of ascertaining technological trend so as to carry out efficient technological transfer, and for the purpose of replenishing the contents and contributing to the smooth implementation of the engineer exchange project in 'coal mine technological field'. The coal reserves are 400 billion tons, with 840 million tons produced and with 80 million tons exported; not less than 56% of the U.S. domestic electricity rests on coal. Production by open-pit mining is the majority while the output by underground mining is 38%; the Longwall method has increased as a digging method, taking 18% of all digging output. The productivity is 4.24 ton/person per day and ranks as the world highest. The coal mining technological trend in the U.S. can be summarized as follows. The coal mining output in the West is increasing, with the number of mines decreasing, so that the output per mine is increasing. With the output ratio by open-pit mining increasing, the digging method in the mine is being changed to the Longwall. (NEDO)

  15. Engineer exchanging project on coal mine technology field in fiscal 1999. International information exchanging project (advance survey on North America); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Hokubei)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project has been performed with an intention of making visiting surveys and information collection at coal related organizations in overseas coal producing countries on production technology levels and trends. The project is intended to serve for improvement in the contents of and smooth execution of the engineer exchange project in the 'coal mine technology field. It was carried out by the site surveys. The surveys revealed that the situation of the American coal industry is expected of stable increase in the demand and supply in the future, but the coal price is on the falling trend, and therefore, the industry is compelled to further increase the intensity and enhance the productivity. The industry is strongly influenced by the amended air pollution prevention act and nature destruction problems, hence further coal mine curtailment is estimated. Under such a background, it was found that the long-wall mining process progressing toward larger scale and higher productivity, and the high-wall mining process that provides higher productivity at lower cost and has less impact on the environmental problems can continue development in mountainous areas, particularly in the Appalachian area. The high-wall mining process mines coal at exposed facings on the side of a mountain by using a continuous miner, and transports the coal using machines. (NEDO)

  16. Tanjung Enim IV coal exploration project. Volume III. Preliminary mining plan for South Arahan area

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Based on the results of the survey carried out at Tanjung Enim in South Sumatra, a mining plan in the South Arahan area was studied. The plan was studied with geological structure, coal quality and social basement facilities as restriction conditions, with the mining amount, selling price and land transportation expenses as fluctuation factors, and using the optimum mining area determination method (pit optimizer), etc. The results of the survey were classified into the following 11 items: 1) assumptions; 2) pit optimization; 3) pit design; 4) long term scheduling; 5) detailed scheduling; 6) waste dumping; 7) mining equipment model case simulation; 8) mine facilities; 9) mine economics; 10) investigation of coal transportation; 11) conclusion. In 1), study was made on geological modeling, coal quality data and mining economics. (NEDO)

  17. The projects of reducing environmental pollution at the collieries belonging to Petrosani Autonomous Bituminous Coal Administration

    International Nuclear Information System (INIS)

    Arad, V.; Arad, S.; Costinas, B.; Marchis, G.

    1997-01-01

    The economic development in the Jiu Valley, as practised in the mining and processing of bituminous coal, has had a dynamic character without taking into account, however, the harmful impact on the environment. The most severe problem of environmental pollution in the Jiu Valley is that of the pollution of the Jiu River due to the discharge of waste water from the technological processes of mining and processing coal. This paper presents some solutions for reducing this environmental pollution, especially the Jiu water pollution. 1 ref

  18. Report on the FY 1998 results of the New Sunshine Project (B version). Data attached 2. Development of coal liquefaction technology (Development of base technology of liquefaction (Project on internationalization of coal liquefaction technology)); 1998 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B ban). Ekika kiban gijutsu no kaihatsu (sekitan ekika gijutsu no kokusaika jigyo (fuzoku shiryo 2))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the project for internationalization of coal liquefaction technology, this paper reported on the potential survey for location of Indonesian low grade coal liquefaction (study of applicability of the improved BCL process and survey of hydrogen production technology using coal gasification). The survey was conducted of a locational possibility of a coal liquefaction commercial plant to be located at mine site in South Sumatra for Banko coal raw material. The improved BCL process was applied in which the results of the study by NBCL Takasago Research Institute were reflected. Further, the hydrogen production was studied by gasification of Banko coal, and the comparison was made with the conventional natural gas reforming method. As a result of the study using information/knowledge obtained during the conceptual design of Australian brown coal, the construction cost of commercial scale liquefaction plant with the Banko coal processing amount of 30,000 tons/day became 549.8 billion yen in the case of using natural gas as raw material for hydrogen production. This construction cost is the lowest as compared with 601.7 billion yen in the demonstrative BCL process and with 577.1 billion yen in the advanced BCL process. This is a process making use of features of Banko coal. The process for hydrogen production by the steam reforming method using natural gas has an advantage of increasing the production amount of coal-derived liquid the most of the three other methods. (NEDO)

  19. Report on the FY 1998 results of the New Sunshine Project (B version). Data attached 1. Development of coal liquefaction technology (Development of base technology of liquefaction (Project on internationalization of coal liquefaction technology)); 1998 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B ban). Ekika kiban gijutsu no kaihatsu (sekitan ekika gijutsu no kokusaika jigyo (fuzoku shiryo-1))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the project for internationalization of coal liquefaction technology, this paper reported on the potential survey for location of Indonesian low grade coal liquefaction (study of applicability of the improved BCL process and survey of hydrogen production technology using coal gasification). The survey was conducted of a locational possibility of a coal liquefaction commercial plant to be located at mine site in South Sumatra for Banko coal raw material. The improved BCL process was applied in which the results of the study by NBCL Takasago Research Institute were reflected. Further, the hydrogen production was studied by gasification of Banko coal, and the comparison was made with the conventional natural gas reforming method. As a result of the study using information/knowledge obtained during the conceptual design of Australian brown coal, the construction cost of commercial scale liquefaction plant with the Banko coal processing amount of 30,000 tons/day became 549.8 billion yen in the case of using natural gas as raw material for hydrogen production. This construction cost is the lowest as compared with 601.7 billion yen in the demonstrative BCL process and with 577.1 billion yen in the advanced BCL process. This is a process making use of features of Banko coal. The process for hydrogen production by the steam reforming method using natural gas has an advantage of increasing the production amount of coal-derived liquid the most of the three other methods. (NEDO)

  20. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Pre-survey in Europe; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Oshu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This survey in Europe surveyed the current status of the coal industry, supporting directions and policies of governments on the coal industry, and summarized the information thereof. The survey included movements in policies and activities in transfer of technologies to overseas countries by governments and corporations of different countries, and the current status of the coal technology training project. The survey covered Britain and Germany. The British coal industry is facing a serious difficulty because the electric power industry being the major coal purchaser has changes its sourcing to natural gas. In addition, the open-cut mining which has been considered high in productivity has no further hope of big progress due to regulations in the environmental aspects. However, as a result of having performed positively research and development on production cost reduction, the production efficiency has grown excellently. Using this situation as the base, positive advancement into overseas countries is being carried out. The German coal industry has, in spite of having reduced the production size and the number of coal mines, shifted coal purchasers to electric power generation and steel making areas, and its quality and supply capability stand equivalent to those of imported coals. (NEDO)

  1. Burnout, Depression and Proactive Coping in Underground Coal Miners in Serbia - Pilot Project

    Directory of Open Access Journals (Sweden)

    Manić Saška

    2017-03-01

    Full Text Available Mining is unsurprisingly considered a high-risk occupation because it involves continuous hard labour under highly demanding and stressful conditions. Many of these work stressors can impair individuals’ well-being in both a physiological and psychological sense. The aims of this study were to assess the prevalence of burnout and depressive symptoms and to evaluate aspects of proactive coping among underground coal miners in Serbia. The study involved 46 male underground coal miners. Burnout was measured with the Copenhagen Burnout Inventory, depression was assessed with the Patient Health Questionnaire-9, and level of proactive coping was measured with the Proactive Coping Inventory. The results showed a low level of burnout syndrome among the underground coal miners (12.46±4.879. Depression was slightly above the minimum (1.2±2.094, and the majority of the participants had no symptoms of depression (93.5%. Overall, the underground coal miners’ ability to proactively cope with work stress was very good (42.17±6.567. This is in contrast to the findings of the few previous international studies and is a good basis for further research using a larger sample in Serbia.

  2. Economic impacts on West Virginia from projected future coal production and implications for policymakers

    International Nuclear Information System (INIS)

    Richardson, L J; Cleetus, R; Clemmer, S; Deyette, J

    2014-01-01

    Multiple economic and geologic factors are driving fundamental changes in the nation’s energy system, weakening coal’s dominance as a fuel for electricity generation, with significant implications for places like West Virginia that are heavily dependent on coal for economic activity. Some of these factors include low natural gas prices, rising labor costs and declining productivity, economic competition with other coal mining regions, environmental regulations to reduce pollution and safeguard public health, state energy efficiency and renewable electricity standards, falling costs of renewable energy resources like wind and solar, and the likely prospect of future limits on greenhouse gas emissions. This analysis uses an input–output model to examine the effects on West Virginia’s economy from these multiple factors by exploring a range of scenarios for coal production through 2020. In addition to changes in the coal industry, hypothetical investments in additional sectors of the economy are considered as a way to gauge potential alternative economic opportunities. This paper offers recommendations to policymakers for alternative economic development strategies needed to create new jobs and diversify the state’s economy, and highlights the importance of transition assistance at the federal level. (paper)

  3. Coal 95

    International Nuclear Information System (INIS)

    Sparre, C.

    1995-01-01

    The report deals with the use of coal and coke in Sweden during 1994. Some information about technology, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from Statistics Sweden have also been used.The use of steam coal for heating purposes has been unchanged during 1994 at a level of 1 Mtons. The production in the cogeneration plants has been constant, but has increased for electricity production. The minor plants have increased their use of forest fuels. The use of steam coal will probably go down in the next years both for heat and cogeneration plants. During the top year 1987 coal was used in 18 hot water and 11 cogeneration plants. 1994 these figures are 3 and 12. Taxes and environmental reasons explain this trend. The use of steam coal in industry has been constant at the level 0.7 Mtons. The import of metallurgical coal in 1993 was 1.6 Mtons, like 1992. Import of 0.3 Mtons of coke gives the total consumption of coke in industry as 1.5 Mtons. the average price of steam coal imported to Sweden was 317 SEK/ton, 3% higher than 1993. All Swedish plants meet their emission limit of dust, SO 2 and NO x as given by county administrations or concession boards. The cogeneration plants all have some SO 2 removal system. The biggest cogeneration plant (Vaesteraas) has recently invested in a SCR NO x cleaning system. Most other plants use low NO x burners or SNR injection systems based on ammonia or urea. 2 figs, 13 tabs

  4. Fiscal 2000 coal engineer training project. Report on senior course; 2000 nendo sekitan gijutsusha yosei jigyo jokyu course hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The above-named course consisted of three weeks of lectures and three months of visits to coal mines and harbor facilities and tours to coal consumers such as power stations and steel manufacturing plants. The report has turned out to be an introductory manual on coal mining consisting of coal mining technologies such as coal resource exploration, coal mining, and coal preparation, and the state of Australian coal industry. The manual comprises (1) job training in Japan (attendance at lectures), (2) inspection and training in Japan (coal consumers), (3) intensified lectures at University of New South Wales (coal mining and preparation), (4) current state of Austrian coal industry, (5) inspection tours to Australian coal mines, (6) inspection tours to Australian harbor facilities, and (7) the state of Australian coal mine management. Fifteen intensified lectures were given, including the 'Overview of Australian coal industry' and 'Coal handling and transport.' Nine coal mines were visited in Queensland, and 21 in New South Wales. As for the state of Australian coal mine management, there is a trend toward contract mining but self-mining constitutes the mainstream. (NEDO)

  5. Seismic characterization of CO{sub 2} in coals

    Energy Technology Data Exchange (ETDEWEB)

    McCrank, J.; Lawton, D.C. [Calgary Univ., AB (Canada). Dept. of Geoscience, Consortium for Research in Elastic Wave Exploration Seismology

    2008-07-01

    The Mynheer coal seam was targeted for an enhanced coalbed methane (CBM) experiment. During initial testing of the reservoir permeability, 180 tonnes of carbon dioxide (CO{sub 2}) was injected into the seam. The objective of the study was to characterize the coal zones and to determine if the small volume of CO{sub 2} in the thinly bedded and seismically tuned reservoir can be detected in the 3D surface seismic data. The multi-well pilot project took place in the Pembina Field of west-central Alberta. The Ardley coals were tested for CO{sub 2} injection, enhanced CBM production, and CO{sub 2} sequestration. The seismic survey captured the condition of the reservoir after formation permeability tests. It was concluded that the anomalies seen in the seismic data can be attributed to changes in the physical properties of the coal due to CO{sub 2} adsorption. 2 refs., 5 figs.

  6. Report on investigations in fiscal 2000 on the projects to support introduction of environment friendly coal utilization system. Green helmet project for briquette production plant - Mae Moh coal mine, Thailand; 2000 nendo kankyo chowagata sekitan riyo system donyu shien jigyo chosa hokokusho. Briquette seizo setsubi ni kakawaru green helmet jigyo (Thai koku Mae Moh tanko)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    This Green Helmet Project is intended to suppress generation of environment polluting substances in association with coal utilization in Thailand by demonstrating and improving the proliferation infrastructure for the clean coal technology to be used widely in Thailand. The project is also intended to serve for stabilized assurance of energies for Japan. The demonstration project related to briquette manufacturing facilities executed as one of the 'Projects to support introduction of environment friendly coal utilization system' is intended to manufacture at low cost a briquette which is low in odor, free of smoke, and suppressed largely of sulfur oxide generation. The briquette is made by adding clayish minerals, sulfur, a fixing agent and a binder into brown coal being a low grade coal. The project implements proliferation of the technology to reduce environmental load associated with coal utilization in developing countries according to the situation and needs of the counterpart countries. The present project has performed the site surveys and guidance of operation and maintenance techniques as follow-up works of the demonstration project having been completed by cooperation between Japan and Thailand. It is considered that what had been intended in the beginning has been achieved sufficiently. (NEDO)

  7. Coal information 1996

    International Nuclear Information System (INIS)

    1997-01-01

    Coal Information (1997 edition) is the latest edition of a publication that has been produced annually by the IEA since 1983. The report is intended to provide both Member countries of the OECD and those employed in all sectors of the coal industry with information on current world coal market trends and long-term prospects. It includes information on coal prices, demand, trade, supply, production capacity, transport, environmental issues (including emission standards for coal-fired boilers), coal ports, coal-fired power stations and coal used in non -OECD countries. Part I of the publication contains a wide ranging review of world coal market developments in 1996 and current prospects to 2010. The review is based on historical data of OECD energy supply and demand, data on other world regions, projections of OECD coal supply, demand and trade and information provided by the CIAB. Part II provides, in tabular and graphical form, a more detailed and comprehensive statistical picture of coal developments and future prospects for coal in the OECD, by region and for individual Member countries. Readers interested in projections are strongly advised to read the notes for individual countries in Principles and Definitions in Part II. Coal statistics for non-OECD countries are presented in Part III of the book. Summary data are available on hard coal supply and end-use statistics for about 40 countries and regions world-wide. Data are based on official national submissions to the United Nations in Geneva and New York, national energy publications, information provided to the IEA Secretariat by national statistical offices as well as other unofficial Secretariat sources. Further information on coal used in non-OECD countries is published annually by the IEA in Energy Statistics and Balances of Non-OECD Countries. Also included in Part III are the Survey of Coal Ports world-wide and the Survey of Coal-fired Power Stations in coal-importing countries

  8. Underground coal gasification: An overview of groundwater contamination hazards and mitigation strategies

    Energy Technology Data Exchange (ETDEWEB)

    Camp, David W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); White, Joshua A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-03-13

    Underground coal gasification is the in situ conversion of coal into an energy-rich product gas. It takes place deep underground, using chemical reactions to consume the coal and grow a cavity. Gas wells, drilled into the coal seam, inject reactant air, oxygen, and/or steam to sustain the reactions. Production wells then extract the product gas. Careful analysis and understanding of likely failure modes will help prevent and minimize impacts. This document provides a general description of the relevant processes, potential failure modes, and practical mitigation strategies. It can guide critical review of project design and operations.

  9. Comprehensive report to Congress Clean Coal Technology Program

    International Nuclear Information System (INIS)

    1992-06-01

    This project will provide a full-scale demonstration of Micronized Coal Reburn (MCR) technology for the control of NO x on a wall-fired steam generator. This demonstration is expected to reduce NO x emissions by 50 to 60%. Micronized coal is coal that has been very finely pulverized (80% less than 325 mesh). This micronized coal, which may comprise up to 30% of the total fuel fired in the furnace, is fired high in the furnace in a fuel-rich reburn zone at a stoichiometry of 0.8. Above the reburn zone, overfire air is injected into the burnout zone at high velocity for good mixing to ensure complete combustion. Overall excess air is 15%. MCR technology reduces NO x emissions with minimal furnace modifications, and the improved burning characteristics of micronized coal enhance boiler performance

  10. AIDS incidence and mortality in injecting drug users: the AjUDE-Brasil II Project

    Directory of Open Access Journals (Sweden)

    Cardoso Mauro Nogueira

    2006-01-01

    Full Text Available This paper presents AIDS incidence and mortality among injecting drug users (IDUs reached by the AjUDE-Brasil II Project. From a cross-sectional survey, 478 IDUs were interviewed in three Brazilian cities: Porto Alegre, São José do Rio Preto, and Itajaí. The cohort was followed up in the Brazilian surveillance database for AIDS and mortality during 2000 and 2001. AIDS incidence was 1.1 cases per 100 person-years, and the mortality rate was 2.8 deaths per 100 person-years. AIDS cases only occurred in IDUs who reported ever having shared injecting equipment. Female gender (RR = 5.30, homelessness (RR = 6.16, and report of previous sexual relations with same-sex partners (RR = 6.21 were associated with AIDS. Deaths occurred only among males. Homelessness (RR = 3.00, lack of income (RR = 2.65, HIV seropositive status (RR = 4.52, and no history of incarceration (RR = 3.71 were also associated with death. These findings support evidence that gender and socioeconomic conditions are both determinants of morbidity and mortality in Brazilian IDUs.

  11. Projecting Sexual and Injecting HIV Risks into Future Outcomes with Agent-Based Modeling

    Science.gov (United States)

    Bobashev, Georgiy V.; Morris, Robert J.; Zule, William A.

    Longitudinal studies of health outcomes for HIV could be very costly cumbersome and not representative of the risk population. Conversely, cross-sectional approaches could be representative but rely on the retrospective information to estimate prevalence and incidence. We present an Agent-based Modeling (ABM) approach where we use behavioral data from a cross-sectional representative study and project the behavior into the future so that the risks of acquiring HIV could be studied in a dynamical/temporal sense. We show how the blend of behavior and contact network factors (sexual, injecting) play the role in the risk of future HIV acquisition and time till obtaining HIV. We show which subjects are the most likely persons to get HIV in the next year, and whom they are likely to infect. We examine how different behaviors are related to the increase or decrease of HIV risks and how to estimate the quantifiable risk measures such as survival HIV free.

  12. Monitoring a large volume CO2 injection: Year two results from SECARB project at Denbury’s Cranfield, Mississippi, USA

    Science.gov (United States)

    Hovorka, Susan D.; Meckel, Timothy A.; Trevino, Ramon H.; Lu, Jiemin; Nicot, Jean-Philippe; Choi, Jong-Won; Freeman, David; Cook, Paul; Daley, Thomas M.; Ajo-Franklin, Jonathan B.; Freifeild, Barry M.; Doughty, Christine; Carrigan, Charles R.; La Brecque, Doug; Kharaka, Yousif K.; Thordsen, James J.; Phelps, Tommy J.; Yang, Changbing; Romanak, Katherine D.; Zhang, Tongwei; Holt, Robert M.; Lindler, Jeffery S.; Butsch, Robert J.

    2011-01-01

    The Southeast Regional Carbon Sequestration Partnership (SECARB) early project in western Mississippi has been testing monitoring tools and approaches to document storage efficiency and storage permanence under conditions of CO2 EOR as well as downdip injection into brine. Denbury Onshore LLC is host for the study and has brought a depleted oil and gas reservoir, Cranfield Field, under CO2 flood. Injection was started in July 2008 and has now achieved injection rates greater than 1.2 million tons/year though 23 wells, with cumulative mass injected as of August, 2010 of 2.2 million metric tons. Injection is into coarse grained fluvial deposits of the Cretaceous lower Tuscaloosa Formation in a gentle anticline at depths of 3300 m. A team of researchers from 10 institutions has collected data from five study areas, each with a different goal and different spatial and temporal scale.

  13. Summary of FY 1980 results of Sunshine Project. Development of coal liquefaction techniques; 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sunshine keikaku itaku kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the results of the 3 R and D themes for coal liquefaction techniques, pursued by the Sunshine Project; (1) development of solvent extraction type liquefaction plant, and brown coal liquefaction technique R and D demonstration surveys, (2) development of solvolysis type liquefaction plant, and (3) development of direct hydrogenation type liquefaction plant. For the theme (1), the 1 T/D test plant, solid/liquid separator and small-size continuous settlement separator are constructed, and partly completed. The elementary studies include solvent extraction type liquefaction process, materials for coal liquefaction plant and solid/liquid separation. Australia's Victoria brown coal and Chinese coal are studied to clarify the possible problems involved in liquefaction of these coal species for commercialization of the liquefaction techniques in the early stage. The elementary techniques studied include dehydration of brown coal, milling at high temperature in oil, de-ashing, and secondary and primary hydrogenation. For the theme (2), the 1 T/D plant is inspected and maintained to clarify the problems involved in the continuous operation, revamped and repaired as necessary, given preventive maintenance, and tested for operability confirmation. The elementary studies include solvolysis type liquefaction process, scale-up, hydrogenation plant for solvolysis pitch. For the item (3), the 2.4 T/D test plant is constructed, and the elementary studies are conducted, for, e.g., liquefaction reactions in the presence of an iron-based catalyst. (NEDO)

  14. Summary of FY 1980 results of Sunshine Project. Development of coal liquefaction techniques; 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sunshine keikaku itaku kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the results of the 3 R and D themes for coal liquefaction techniques, pursued by the Sunshine Project; (1) development of solvent extraction type liquefaction plant, and brown coal liquefaction technique R and D demonstration surveys, (2) development of solvolysis type liquefaction plant, and (3) development of direct hydrogenation type liquefaction plant. For the theme (1), the 1 T/D test plant, solid/liquid separator and small-size continuous settlement separator are constructed, and partly completed. The elementary studies include solvent extraction type liquefaction process, materials for coal liquefaction plant and solid/liquid separation. Australia's Victoria brown coal and Chinese coal are studied to clarify the possible problems involved in liquefaction of these coal species for commercialization of the liquefaction techniques in the early stage. The elementary techniques studied include dehydration of brown coal, milling at high temperature in oil, de-ashing, and secondary and primary hydrogenation. For the theme (2), the 1 T/D plant is inspected and maintained to clarify the problems involved in the continuous operation, revamped and repaired as necessary, given preventive maintenance, and tested for operability confirmation. The elementary studies include solvolysis type liquefaction process, scale-up, hydrogenation plant for solvolysis pitch. For the item (3), the 2.4 T/D test plant is constructed, and the elementary studies are conducted, for, e.g., liquefaction reactions in the presence of an iron-based catalyst. (NEDO)

  15. Public views of reclaiming an abandoned coal mine: the Macoupin County project

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, J. R.

    1980-07-01

    An abandoned underground coal mine waste area in Macoupin County, Illinois, has been reclaimed for demonstration and research purposes near the city of Staunton. According to federal law, end uses of reclaimed coal mines must be determined in part by local concerns. This study examined local residents' preferences for land uses and their social and economic evaluations of reclamation at the Macoupin County site. Personal interviews with 119 residents revealed preferences for recreational use of the demonstration area; however, responses were probably influenced by prior awareness of land-use intentions. Generally, very positive evaluations of the reclamation were received. Willingness to pay for reclamation appears to be linked to fulfillment of desired recreational uses on the site and socioeconomic status of the respondent. In general, the research results provide further evidence that the value of abatement of environmental damage from mining is recognized and supported in economic terms at the public level.

  16. British Coal Compass project summary: colliery based manpower, personnel, scheduling and safety systems and processes

    Energy Technology Data Exchange (ETDEWEB)

    Long, V. [Oasis Group plc (United Kingdom)

    1995-12-01

    In early 1991 British Coal reviewed its existing personnel and manpower planning systems and concluded they were inadequate for the future needs of the business. British Coal`s strategy to continue to improve productivity required payroll and personnel related systems which could support new flexible working hours and variable shifts. This strategy would enable machine running time to be increased, leading to improved productivity levels. The Corporation chose to install a distributed, integrated computer system, code named `Compass` to devolve many of the responsibilities for the management and payment of the industrial workforce from Corporate headquarters` functions to all its collieries. The system consists of eight main software systems: an on-line, real-time time and attendance system; a ristering system; a colliery personnel system; a strategic manpower planning system; a local data capture system; a central, core payroll system; a corporate personnel database; and a fail-safe, resilience system. The article describes the technology used and discusses the benefits of the system which started operations in autumn 1993. 3 figs.

  17. A sustainable livelihood framework to implement CSR project in coal mining sector

    Directory of Open Access Journals (Sweden)

    Sapna A. Narula

    2017-01-01

    Full Text Available Corporate social responsibility (CSR in mining areas has increased momentum especially in countries like India where it has been made mandatory. The primary objective of this paper is to document actual social challenges of mining in field areas and find out how companies in the coal sector can work in a systematic manner to achieve uplift of affected communities. The first part of the paper draws evidence from three different bodies of literature, i.e. CSR and coal mining, capacity building and livelihood generation in mining areas. We try to converge the literature to propose a novel framework for livelihood generation work through capacity building with the help of CSR investments. The paper also documents a live case of planning and the implementation of capacity building activities in Muriadih coal mines in the Jharkhand state of India and offers lessons to both business and policy makers. The proposed framework has only been experimented in a local context, yet has the potential to be replicated in other mining areas.

  18. Coal -98

    International Nuclear Information System (INIS)

    Sparre, C.

    1998-01-01

    Energi, Haesselbyverket, has now invested in equipment for burning pellets instead of coal. In Linkoeping wastes of rubber are mixed with coal. Also Soederenergi AB has rebuilt their three coal boilers and replaced 100 % of the coal by peat and wood fuels. Coal is a reserve fuel. Several co-generation plants like Linkoeping, Norrkoeping, Uppsala and Oerebro use both coal and forest fuels. The use of coal is then concentrated to the electricity production. The average price of steam coal imported in Sweden in 1997 was 370 SEK/ton or 10 per cent higher than in 1996. For the world, the average import price fell to 46 USD/ton. The price fall was concentrated to the 4th quarter. The prices have continued to fall during 1998 as a result of the crisis in Asia. All Swedish plants meet their emission limits of dust, SO 2 and NO x given by county administrations or concession boards. The co-generation plants have all some sort of SO 2 -removal system. Mostly used is the wet-dry method. The biggest co-generation plant, Vaesteraas, has newly invested in a ca talytic NO x -cleaning system type SCR, which is reducing the emission level 80-90 %. Most other plants are using low NO x -burners or injection systems type SNCR, based on ammonium or urea, which are reducing the emissions 50-70 %. A positive effect of the recently introduced NO x -duties is a 60 % reduction compared to some years ago, when the duties were introduced. World hard coal production was about 3 800 tons in 1997, a minor increase compared to 1996. The coal demand in the OECD-countries has increased about 1.7 % yearly during the last ten years. The coal share of the energy supply is about 20% in the OECD-countries and 27% in the whole world. Several sources estimate a continuing growth during the next 20 years in spite of an increasing use of natural gas and nuclear power. The reason is a strong demand for electrical power in the Asian countries and the developing countries. However, greater efforts to minimize the

  19. A Poromechanical Model for Coal Seams Injected with Carbon Dioxide: From an Isotherm of Adsorption to a Swelling of the Reservoir Un modéle poromécanique pour l’injection de dioxyde de carbone dans des veines de charbon : d’une isotherme d’adsorption à un gonflement du réservoir

    Directory of Open Access Journals (Sweden)

    Nikoosokhan S.

    2012-11-01

    Full Text Available Injecting carbon dioxide into deep unminable coal seams can enhance the amount of methane recovered from the seam. This process is known as CO2-Enhanced Coal Bed Methane production (CO2-ECBM. The seam is a porous medium whose porous system is made of cleats (small natural fractures and of coal pores (whose radius can be as small as a few angström. During the injection process, the molecules of CO2 get adsorbed in the coal pores. Such an adsorption makes the coal swell, which, in the confined conditions that prevail underground, induces a closure of the cleat system of the coal bed reservoir and a loss of injectivity. In this work, we develop a poromechanical model which, starting from the knowledge of an adsorption isotherm and combined with reservoir simulations, enables to estimate the variations of injectivity of the coal bed reservoir over time during the process of injection. The model for the coal bed reservoir is based on poromechanical equations that explicitly take into account the effect of adsorption on the mechanical behavior of a microporous medium. We consider the coal bed reservoir as a dual porosity (cleats and coal porosity medium, for which we derive a set of linear constitutive equations. The model requires as an input the adsorption isotherm on coal of the fluid considered. Reversely, the model provides a way to upscale an adsorption isotherm into a meaningful swelling of the coal bed reservoir at the macroscopic scale. The parameters of the model are calibrated on data on coal samples available in the literature. Reservoir simulations of an injection of carbon dioxide in a coal seam are performed with an in-house finite volume and element code. The variations of injection rate over time during the process of injection are obtained from the simulations. The effect of the compressibility of the coal matrix on those variations is discussed. L’injection de dioxyde de carbone dans des veines de charbon profondes peut augmenter

  20. Report on the achievements in the Sunshine Project. A comprehensive report on development of coal liquefaction technologies and a performance test on Chinese coal liquefaction (fiscals 1981 through 1987); Sekitan ekika gijutsu kaihatsu seika hokokusho. Chugokutan ekika seino shiken sogo hokokusho (1981 nendo kara 1987 nendo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The present Japan-China joint development project is intended to study liquefaction performance of different types of Chinese coals, select coal types suitable for coal liquefaction, and serve for enhancement in the coal liquefaction technologies employed by the Chinese side. Since a small continuous testing device has been installed in fiscal 1982 and begun with the trial operation in March 1983, the liquefaction test has been performed for about five years, and is scheduled to continue another three years. Chinese coals produced in seven provinces and two autonomous regions have been subjected to the coal type selection, on which discussions were given for liquefying reaction characteristics by using autoclave testing and small continuous testing devices. As a result, circulation tests were performed by the end of fiscal 1987 on five coal types, namely Beisu coal, Texgxian coal, Xianfeng coal, Shenmu coal, and Meihekou coal. Data were acquired during the circulation and at the equilibrium. Comparison of the results of tests on these five coal types with the results having been acquired from the 0.1-t/d BSU in Japan before modification verified the result being nearly reasonable. (NEDO)

  1. PETROBRAS green petroleum coke used as partial replacement for coal injected mixtures in blast furnaces; Utilizacao do coque verde de petroleo da PETROBRAS em substituicao parcial ao carvao mineral das misturas injetadas em altos fornos

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Agenor Medrado da; Medrado, Swami Botelho; Noblat, Sebastiao Jorge Xavier [Companhia Siderurgia Nacional. CSN. Gerencia Geral de Processos Siderurgicos. RJ (Brazil)], e-mails: ams@csn.com.br, swami@csn.com.br, s.noblat@csn.com.br; Carvalho Junior, Joao Andrade de [Universidade Estadual Paulista Julio de Mesquita Filho. Faculdade de Engenharia de Guaratingueta. Departamento de Energia, SP (Brazil)], e-mail: joao@feg.unesp.br

    2010-04-15

    The PETROBRAS produced green petroleum coke (GPC) is a carbon rich fuel, virtually ash-free, with low sulfur content and is a fuel suitable to replace metallurgical coke in blast furnaces. The GPC was tested in a pulverized coal injection simulator built in the Volta Redonda research center. It presented a low burning efficiency due to low volatile material content and high substitution rate by the carbon content. The industrial-scale tests were carried out in blast furnaces with up to 50% PETROBRAS GPC in the coal blends, which has never been done before in the steel industry. The injected coal/CVP mixtures produced no negative side effects in the blast furnace grinding systems, pneumatic conveying or operating process. The mixture burning process inside the blast furnace, showed a decrease in fuel consumption, with a significant reduction in metallurgical coke consumption. The industrial-scale tests of the GPC mixtures did not reach the 70% maximum for lack of the GPC feedstock, it being necessary to continue with standard coal mixtures. (author)

  2. Indonesian coal export potential

    International Nuclear Information System (INIS)

    Millsteed, Ch.; Jolly, L.; Stuart, R.

    1993-01-01

    Indonesia's coal mining sector is expanding rapidly. Much of the increase in coal production since the mid-1980s has been exported. Indonesian coal mining companies have large expansion programs and continuing strong export growth is projected for the remainder of the 1990s. The low mining costs of indonesian coal, together with proximity to Asian markets, mean that Indonesia is well placed to compete strongly with other thermal coal exporters and win market share in the large and expanding thermal coal market in Asia. However, there is significant uncertainty about the likely future level of Indonesia's exportable surplus of coal. The government's planned expansion in coal fired power generation could constrain export growth, while the ability of producers to meet projected output levels is uncertain. The purpose in this article is to review coal supply and demand developments in Indonesia and, taking account of the key determining factors, to estimate the level of coal exports from Indonesia to the year 2000. This time frame has been chosen because all currently committed mine developments are expected to be on stream by 2000 and because it is difficult to project domestic demand for coal beyond that year. 29 refs., 8 tabs., 7 figs

  3. Managing produced water from coal seam gas projects: implications for an emerging industry in Australia.

    Science.gov (United States)

    Davies, Peter J; Gore, Damian B; Khan, Stuart J

    2015-07-01

    This paper reviews the environmental problems, impacts and risks associated with the generation and disposal of produced water by the emerging coal seam gas (CSG) industry and how it may be relevant to Australia and similar physical settings. With only limited independent research on the potential environmental impacts of produced water, is it necessary for industry and government policy makers and regulators to draw upon the experiences of related endeavours such as mining and groundwater extraction accepting that the conclusions may not always be directly transferrable. CSG is widely touted in Australia as having the potential to provide significant economic and energy security benefits, yet the environmental and health policies and the planning and regulatory setting are yet to mature and are continuing to evolve amidst ongoing social and environmental concerns and political indecision. In this review, produced water has been defined as water that is brought to the land surface during the process of recovering methane gas from coal seams and includes water sourced from CSG wells as well as flowback water associated with drilling, hydraulic fracturing and gas extraction. A brief overview of produced water generation, its characteristics and environmental issues is provided. A review of past lessons and identification of potential risks, including disposal options, is included to assist in planning and management of this industry.

  4. Equipment sizing in a coal-fired municipal heating plant modernisation project with support for renewable energy and cogeneration technologies

    International Nuclear Information System (INIS)

    Kalina, Jacek

    2014-01-01

    Highlights: • Sizing of biomass fired cogeneration block is performed for existing heating plant. • Mathematical model for cogeneration block optimisation is presented. • Impact of financial support mechanisms on optimal solution is discussed. • Influence of short term variations of prices and support intensity is presented. • Different design parameters are suggested by economic and technical quality indices. - Abstract: The paper presents results of design parameters optimisation of a wood chips fired steam boiler based heat and power block in a sample project of coal fired municipal heating plant modernisation. The project assumes the conversion of the heating plant into a dual fuel heat and power plant. The problem that is presented is selection of cogeneration block structure and thermodynamic parameters taking into account financial support mechanisms for cogeneration and renewable energy technologies. There are examined energy conversion and financial performances of the project. The results show that without the financial support the project is not profitable although it generates savings of primary energy of fossil fuels. If an administrative incentives are applied the optimal technical solution is different than suggested by energy conversion efficiency or fossil fuel savings. Financial calculations were performed for Polish marked conditions in the years 2011 and 2014 showing the impact of relatively short term variations of prices and support intensity on optimal plant design parameters

  5. The coal cleat system: A new approach to its study

    Directory of Open Access Journals (Sweden)

    C.F. Rodrigues

    2014-06-01

    Full Text Available After a general analysis regarding the concept of coal “cleat system”, its genetic origin and practical applications to coalbed methane (CBM commercial production and to CO2 geological sequestration projects, the authors have developed a method to answer, quickly and accurately in accordance with the industrial practice and needs, the following yet unanswered questions: (1 how to define the spatial orientation of the different classes of cleats presented in a coal seam and (2 how to determine the frequency of their connectivites. The new available and presented techniques to answer these questions have a strong computer based tool (geographic information system, GIS, able to build a complete georeferentiated database, which will allow to three-dimensionally locate the laboratory samples in the coalfield. It will also allow to better understand the coal cleat system and consequently to recognize the best pathways to gas flow through the coal seam. Such knowledge is considered crucial for understanding what is likely to be the most efficient opening of cleat network, then allowing the injection with the right spatial orientation, of pressurized fluids in order to directly drain the maximum amount of gas flow to a CBM exploitation well. The method is also applicable to the CO2 geological sequestration technologies and operations corresponding to the injection of CO2 sequestered from industrial plants in coal seams of abandoned coal mines or deep coal seams.

  6. Coal in Canada

    International Nuclear Information System (INIS)

    Salaff, S.

    1991-01-01

    This article examines the potential market for coal-fired independent power projects in western Canada. The topics of the article include emissions issues, export potential for power produced, and financial and other assistance to independent power producers offered by British Columbia Hydro and coal mining companies in the region, including financing of projects and power distribution services including connecting to the USA grids

  7. Report on the coal energy achievements in the Sunshine Project in fiscal 1988; 1989 nendo sunshine keikaku seika hokokusho. Sekitan energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This paper describes the achievements in the Sunshine Project in fiscal 1988 in studies on coal liquefaction. The liquefaction mechanisms may be conceived to work in the following three manners: radicals produced by spontaneous bond and cleavage of coal molecules draw out hydrogen from the donor and stabilize it; bond, cleavage and stabilization due to hydrogenation from the donor to coal aromatic nucleus; and cleavage and stabilization due to work of active hydrogen discharged from the donor. How these mechanisms contribute to composition of the products depends on coals, liquefying conditions, and reactivity of the donor. Selection of the donor solvent requires design by which high liquefaction yield can be obtained with small amount of solvent. The oil plus asphaltene yield could have been approached to the ideal value through the moving liquefaction of gaseous phase hydrogen and catalyst-free hydrogen, with the 4HFL to coal ratio at 1.5 to 1. The gaseous phase hydrogen was found effective in reducing 4HFL. Liquefaction residual oil manufactured from Morwell brown coal subjected to BCL was hydrogenated in single stage or two stages to compare and discuss the solvent sorting constituents, reactivity of CLVR, and how the catalytic activity deteriorates. The cause for the catalyst deterioration was elucidated, and considerations were given on catalysts and reaction conditions for lightening and refining of CLVR. (NEDO)

  8. Leaching Behavior of Coal Combustion Products and the Environmental Implication in Road Construction : Project Progress Report

    Science.gov (United States)

    2009-01-26

    This is the third annual report for Project #043352. Project #043352 is designed to establish the leaching characteristics for several different types of ash using a relatively rigorous leaching procedure developed by Kosson et al (2002) for a wide r...

  9. Coal-to-liquid

    Energy Technology Data Exchange (ETDEWEB)

    Cox, A.W.

    2006-03-15

    With crude oil prices rocketing, many of the oil poor, but coal rich countries are looking at coal-to-liquid as an alternative fuel stock. The article outlines the two main types of coal liquefaction technology: direct coal liquefaction and indirect coal liquefaction. The latter may form part of a co-production (or 'poly-generation') project, being developed in conjunction with IGCC generation projects, plus the production of other chemical feedstocks and hydrogen. The main part of the article, based on a 'survey by Energy Intelligence and Marketing Research' reviews coal-to-liquids projects in progress in the following countries: Australia, China, India, New Zealand, the Philippines, Qatar and the US. 2 photos.

  10. Research report of FY 1997 on the environmentally acceptable coal utilization system feasibility survey. Clean coal technology model project seminar held in Thailand; 1997 nendo seika hokokusho. Kankyo chowagata sekitan riyo system kanosei chosa (Tai ni okeru clean coal technology model jigyo seminar no kaisai)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    To reduce SOx with coal utilization, the desulfurization seminar diffusing the demonstration project of simplified desulfurizer introduction was held at the site in Thailand. The purpose is to reduce the environmental pollutants and contribute to the effective utilization of energy with coal utilization in Thailand. Invitation letters were sent to users of coal and heavy oil boilers through the Department of Factories, Ministry of Industry, Thailand, to call participation in the seminar. Inspection of the desulfurizer introduced in the factory of Thai Union Paper Public was included in the seminar for diffusing the project. The inspection site is in the demonstration project site of simplified desulfurizer introduction. There were a lot of participants from Thai users and from Japan. The seminar included the presentations from NEDO, JETRO, FTI, and MOSTE, introduction of general technology for processes of ENAA desulfurizer, introduction of demonstration unit plan by IHI, and introduction of operation of demonstration unit by TUP. 31 figs., 6 tabs.

  11. Fiscal 1998 overseas geological structure survey report on the engineer interchange project (coal mine technology field), Indonesia; 1998 nendo kaigai chishitsu kozo nado chosa gijutsusha koryu jigyo (tanko gijutsu bun'ya), Indonesia hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project aims at improvement of coal mining technology and productivity in Indonesia by Japanese production control technology and business management technology for underground coal mining, through interchange of coal engineers between Japan and Indonesia. This project is composed of the short- term and long-term dispatch project of engineers to Indonesia, and the training project of Indonesian engineers in Japan. In fiscal 1998, the short-term dispatch was made for the training in Indonesia on underground coal mine development (development planning, pit mouth selection, main gallery design, mining system selection, transport planning, ventilation planning, under-river mining, mine water proofing, drainage). The long-term dispatch was made for contact and negotiation with concerned Indonesian organizations, support of the training project, and collection of information on the trend of Indonesian economy and energy, and the present and trend of the coal industry for conducting smooth and effective engineer interchange. (NEDO)

  12. EROI Analysis for Direct Coal Liquefaction without and with CCS: The Case of the Shenhua DCL Project in China

    Directory of Open Access Journals (Sweden)

    Zhaoyang Kong

    2015-01-01

    Full Text Available Currently, there are considerable discrepancies between China’s central government and some local governments in attitudes towards coal to liquids (CTL technology. Energy return on investment (EROI analysis of CTL could provide new insights that may help solve this dilemma. Unfortunately, there has been little research on this topic; this paper therefore analyses the EROI of China’s Shenhua Group Direct Coal Liquefaction (DCL project, currently the only DCL commercial project in the world. The inclusion or omission of internal energy and by-products is controversial. The results show that the EROIstnd without by-product and with internal energy is 0.68–0.81; the EROIstnd (the standard EROI without by-product and without internal energy is 3.70–5.53; the EROIstnd with by-product and with internal energy is 0.76–0.90; the EROIstnd with by-product and without internal energy is 4.13–6.14. Furthermore, it is necessary to consider carbon capture and storage (CCS as a means to control the CO2 emissions. Considering the added energy inputs of CCS at the plant level, the EROIs decrease to 0.65–0.77, 2.87–3.97, 0.72–0.85, and 3.20–4.40, respectively. The extremely low, even negative, net energy, which may be due to high investments in infrastructure and low conversion efficiency, suggests CTL is not a good choice to replace conventional energy sources, and thus, Chinese government should be prudent when developing it.

  13. Coal geopolitics

    International Nuclear Information System (INIS)

    Giraud, P.N.; Suissa, A.; Coiffard, J.; Cretin, D.

    1991-01-01

    This book divided into seven chapters, describes coal economic cycle. Chapter one: coals definition; the principle characteristics and properties (origin, calorific power, international classification...) Chapter two: the international coal cycle: coal mining, exploration, coal reserves estimation, coal handling coal industry and environmental impacts. Chapter three: the world coal reserves. Chapter four: the consumptions, productions and trade. Chapter five: the international coal market (exporting mining companies; importing companies; distributors and spot market operators) chapter six: the international coal trade chapter seven: the coal price formation. 234 refs.; 94 figs. and tabs [fr

  14. Coal fired steam generation for heavy oil recovery

    International Nuclear Information System (INIS)

    Firmin, K.

    1992-01-01

    In Alberta, some 21,000 m 3 /d of heavy oil and bitumen are produced by in-situ recovery methods involving steam injection. The steam generation requirement is met by standardized natural-gas-fired steam generators. While gas is in plentiful supply in Alberta and therefore competitively priced, significant gas price increases could occur in the future. A 1985 study investigating the alternatives to natural gas as a fuel for steam generation concluded that coal was the most economic alternative, as reserves of subbituminous coal are not only abundant in Alberta but also located relatively close to heavy oil and bitumen production areas. The environmental performance of coal is critical to its acceptance as an alternate fuel to natural gas, and proposed steam generator designs which could burn Alberta coal and control emissions satisfactorily are assessed. Considerations for ash removal, sulfur dioxide sorption, nitrogen oxides control, and particulate emission capture are also presented. A multi-stage slagging type of coal-fired combustor has been developed which is suitable for application with oilfield steam generators and is being commissioned for a demonstration project at the Cold Lake deposit. An economic study showed that the use of coal for steam generation in heavy oil in-situ projects in the Peace River and Cold Lake areas would be economic, compared to natural gas, at fuel price projections and design/cost premises for a project timing in the mid-1990s. 7 figs., 3 tabs

  15. UNEP Demonstrations of Mercury Emission Reduction at Two Coal-fired Power Plants in Russia

    Directory of Open Access Journals (Sweden)

    Jozewicz W.

    2013-04-01

    Full Text Available The United Nations Environment Programme (UNEP partnership area “Mercury releases from coal combustion” (The UNEP Coal Partnership has initiated demonstrations of mercury air emission reduction at two coal-fired power plants in Russia. The first project has modified the wet particulate matter (PM scrubber installed in Toliatti thermal plant to allow for addition of chemical reagents (oxidants into the closedloop liquid spray system. The addition of oxidant resulted in significant improvement of mercury capture from 20% total mercury removal (without the additive up to 60% removal (with the additive. It demonstrates the effectiveness of sorbent injection technologies in conjunction with an electrostatic precipitator (ESP. ESPs are installed at 60%, while wet PM scrubbers are installed at 30% of total coal-fired capacity in Russia. Thus, the two UNEP Coal Partnership projects address the majority of PM emission control configurations occurring in Russia.

  16. Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

    International Nuclear Information System (INIS)

    1992-06-01

    The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

  17. Coal development potential in Pakistan

    Energy Technology Data Exchange (ETDEWEB)

    Khan, M N; Pelofsky, A H [eds.

    1986-01-01

    A total of 48 papers were presented, and covered the following topics: the current situation in Pakistan with respect to development and utilization of coal resources; the policies that have been responsible for the development and utilization of coal resources in Pakistan; coal development and utilization in other developing nations e.g. Indonesia, Greece, Philippines, China, Thailand and Haiti; and technological developments in coal exploration; extraction, handling, transport and utilization which could accelerate future development of Pakistan's coal resources. Specific subjects covered include the use of coal in the cement industry of Pakistan; the production of briquettes for domestic use, development and training of personnel for the coal industry; and sources of finance for coal development projects. Particular emphasis is given throughout the conference to the Lakhra coal mine/power plant project which aims to develop and effectively utilize the lignite reserves of Sind Province. 47 papers have been abstracted separately.

  18. Clean coal initiatives in Indiana

    Science.gov (United States)

    Bowen, B.H.; Irwin, M.W.; Sparrow, F.T.; Mastalerz, Maria; Yu, Z.; Kramer, R.A.

    2007-01-01

    Purpose - Indiana is listed among the top ten coal states in the USA and annually mines about 35 million short tons (million tons) of coal from the vast reserves of the US Midwest Illinois Coal Basin. The implementation and commercialization of clean coal technologies is important to the economy of the state and has a significant role in the state's energy plan for increasing the use of the state's natural resources. Coal is a substantial Indiana energy resource and also has stable and relatively low costs, compared with the increasing costs of other major fuels. This indigenous energy source enables the promotion of energy independence. The purpose of this paper is to outline the significance of clean coal projects for achieving this objective. Design/methodology/approach - The paper outlines the clean coal initiatives being taken in Indiana and the research carried out at the Indiana Center for Coal Technology Research. Findings - Clean coal power generation and coal for transportation fuels (coal-to-liquids - CTL) are two major topics being investigated in Indiana. Coking coal, data compilation of the bituminous coal qualities within the Indiana coal beds, reducing dependence on coal imports, and provision of an emissions free environment are important topics to state legislators. Originality/value - Lessons learnt from these projects will be of value to other states and countries.

  19. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  20. Reports on 1976 result of Sunshine Project. Investigation on development policy and position of various coal liquefaction processes in Japan; 1976 nendo Nippon ni okeru kakushu sekitan ekika process no kaihatsu hoshin to ichizuke ni kansuru chosa seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-03-01

    This report is the summary of the 'investigation results concerning development policy and position of various coal liquefaction processes in Japan'. The purpose of this investigative research is primarily to clarify the position of coal energy in the future energy supply, technologies of converting coal to clean fuel as the form of coal energy utilization most suitable for Japan, and the position of coal liquefaction in such converting technologies, and also to decide on the policy of R and D on coal liquefaction process in Japan at present. Accordingly, this paper investigates the status quo of various liquefaction processes including the coal liquefaction technologies for which R and D are conducted under the Sunshine Project; making analysis/assessment from such viewpoint as clean process as environmental safeguard and a precondition for coal energy utilization, technical problems concerning coal import and transportation, and suitability for the present energy consumption structure centering on oil; and further, examining the position of coal liquefaction in the general effective utilization of coal as organic carbonaceous resources in the distant future. (NEDO)

  1. Coal Mines, Reclamation Sites - Mine Drainage Treatment/Land Recycling Project Locations

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Mine Drainage Treatment/Land Reclamation Locations are clean-up projects that are working to eliminate some form of abandoned mine. The following sub-facility types...

  2. Clean Coal Technology III: 10 MW Demonstration of Gas Suspension Absorption final project performance and economics report

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, F.E.

    1995-08-01

    The 10 MW Demonstration of the Gas Suspension Absorption (GSA) program is a government and industry co-funded technology development. The objective of the project is to demonstrate the performance of the GSA system in treating a 10 MW slipstream of flue gas resulting from the combustion of a high sulfur coal. This project involves design, fabrication, construction and testing of the GSA system. The Project Performance and Economics Report provides the nonproprietary information for the ``10 MW Demonstration of the Gas Suspension Absorption (GSA) Project`` installed at Tennessee Valley Authority`s (TVA) Shawnee Power Station, Center for Emissions Research (CER) at Paducah, Kentucky. The program demonstrated that the GSA flue-gas-desulfurization (FGD) technology is capable of achieving high SO{sub 2} removal efficiencies (greater than 90%), while maintaining particulate emissions below the New Source Performance Standards (NSPS), without any negative environmental impact (section 6). A 28-day test demonstrated the reliability and operability of the GSA system during continuous operation. The test results and detailed discussions of the test data can be obtained from TVA`s Final Report (Appendix A). The Air Toxics Report (Appendix B), prepared by Energy and Environmental Research Corporation (EERC) characterizes air toxic emissions of selected hazardous air pollutants (HAP) from the GSA process. The results of this testing show that the GSA system can substantially reduce the emission of these HAP. With its lower capital costs and maintenance costs (section 7), as compared to conventional semi-dry scrubbers, the GSA technology commands a high potential for further commercialization in the United States. For detailed information refer to The Economic Evaluation Report (Appendix C) prepared by Raytheon Engineers and Constructors.

  3. Coal engineer training project for fiscal 1999. Report on general course training; 1999 nendo sekitan gijutsusha yosei jigyo. Ippan course kenshu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-19

    This report was made on the general course training in the coal engineer training project implemented in fiscal 1999. The training was conducted from June 7 through November 19 with total 7 participating trainees from an electric power company, mining company, etc.. In the training, the lectures were given by speakers from domestic coal related companies, universities, laboratories and the like at the University of International Resources, a foundation, for about three weeks. An English training was carried out by three instructors at the same University for about eleven weeks with the purpose of acquiring the linguistic ability required for overseas coal development. The joint seminar was conducted in Tokyo by inviting lecturers, two from Australia and one each from Canada and Indonesia. The training by visiting the domestic coal related companies was such that the overseas lecturers and trainees visited Matsushima Mining Co., the Electric Power Development Company, NKK Corp and others. The overseas study and training were performed on a 35 day schedule by visiting energy-related institutions, mining companies, railway companies, coal loading/unloading harbors, and thermal power stations in Canada, the U.S., and Australia. (NEDO)

  4. Tanjung Enim IV coal exploration project. Volume I. Exploration work of South Arahan area in 2000/2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In the 1996-2001 period, the project has been carried out in Banjarsari/Tanjung Enim areas and South Arahan area of South Sumatra. This report described the results of the project conducted in South Arahan area in 2000/2001. The area for survey is 40km{sup 2} in north block and 10km{sup 2} in south block, and the following were carried out: surface reconnaissance, geological mapping, drilling, geophysical logging, seismic survey (seismic reflection survey and VSP survey), and sampling for coal quality analysis. The number of boreholes drilled was 11 including 8 in north area and 3 in south area, and the total length was 1,847m. Physical logging was executed in all 11 boreholes, and VSP survey was done in one borehole per each block. As to the hydraulic test, water poring test was conducted at 3 boreholes in north block. In the report, the results of the survey were classified into the following 4 items: 1) outline of the survey; 2) field activities; 3) analysis of the results; 4) summarization. (NEDO)

  5. FY 1999 report on the survey of the overseas geological structure, etc. Japan-Indonesia joint Tanjung Enim coal exploration project; 1999 nendo kaigai chishitsu kozo nado chosa hokokusho. Nippon Indonesia sekitan kyodo tansa Tanjung Enim project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The paper summed up the FY 1999 results of the survey conducted based on the agreement on the Tanjung Enim IV coal exploration project which was concluded between NEDO and Indonesia's Ministry of Mining Energy. The survey was made for an area of approximately 40km{sup 2} which is a north block of the south Arahan region, Tanjung Enim, South Sumatra, Indonesia. To grasp the succession of strata/rock facies/geological structure and the state of existence of the coal seams to be drilled, surveys were conducted on ground surface and boreholes. A total of 10 holes was test-drilled, and all the boreholes were physically logged. As a result of the survey, each of A1, A2, B, C and E coal seams was confirmed as main seams. A1, A2 and B seams are low in ash and sulfur contents with heating values of approximately 4,800 kcal/kg, C seam is high in sulfur content, and E seam is high in heating value, 6,000 kcal/kg. As coal seams for open pit mining, existence of A, B and C seams is expected which lay in the shallow part from ground surface to sea level of 0m and in the range of depth of approximately 100m. The proved coal reserves of these coals were estimated at 189 million tons. (NEDO)

  6. FY 1980 Report on results of research and development project, commissioned by Sunshine Project. Analysis and evaluation of coal liquefied oil, and development of its applications; 1980 nendo sekitan ekikayu no bunseki hyoka to yoto kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the results of the first year of the 5-year survey/research project for analysis/evaluation of coal-liquefied oil, structural analysis and development of its applications. The program for analysis/evaluation of coal-liquefied oil includes surveys on the analytical methods for liquefied coal, which are compared with those for oil products, elementary analysis of the ashes in SRC, binder performance tests, and extraction of the problems to be solved for proposal of the analytical methods for coal-liquefied oil. The program for structural analysis includes that of coal-liquefied oil fractionated into middle distillate, fuel oil asphalt and pitches, configurations of a large-size liquefaction process, and characteristics of the oil produced thereby, and some examples of structural analysis are reported. The molecular species and compositions are determined for the middle distillate fraction.. The fuel oil shows average structures of diversified mixtures. The program for developing applications of coal-liquefied oil includes extraction of the problems anticipated when it is used as fuel, technical/economic evaluation of the upgrading techniques, and results and evaluation of conversion of the oil into stocks for chemicals. (NEDO)

  7. MINIMIZATION OF CARBON LOSS IN COAL REBURNING

    Energy Technology Data Exchange (ETDEWEB)

    Vladimir M. Zamansky; Vitali V. Lissianski

    2001-09-07

    This project develops Fuel-Flexible Reburning (FFR), which combines conventional reburning and Advanced Reburning (AR) technologies with an innovative method of delivering coal as the reburning fuel. The overall objective of this project is to develop engineering and scientific information and know-how needed to improve the cost of reburning via increased efficiency and minimized carbon in ash and move the FFR technology to the demonstration and commercialization stage. Specifically, the project entails: (1) optimizing FFR with injection of gasified and partially gasified fuels with respect to NO{sub x} and carbon in ash reduction; (2) characterizing flue gas emissions; (3) developing a process model to predict FFR performance; (4) completing an engineering and economic analysis of FFR as compared to conventional reburning and other commercial NO{sub x} control technologies, and (5) developing a full-scale FFR design methodology. The project started in August 2000 and will be conducted over a two-year period. The work includes a combination of analytical and experimental studies to identify optimum process configurations and develop a design methodology for full-scale applications. The first year of the program included pilot-scale tests to evaluate performances of two bituminous coals in basic reburning and modeling studies designed to identify parameters that affect the FFR performance and to evaluate efficiency of coal pyrolysis products as a reburning fuel. Tests were performed in a 300 kW Boiler Simulator Facility to characterize bituminous coals as reburning fuels. Tests showed that NO{sub x} reduction in basic coal reburning depends on process conditions, initial NO{sub x} and coal type. Up to 60% NO{sub x} reduction was achieved at optimized conditions. Modeling activities during first year concentrated on the development of coal reburning model and on the prediction of NO{sub x} reduction in reburning by coal gasification products. Modeling predicted that

  8. MINIMIZATION OF CARBON LOSS IN COAL REBURNING

    International Nuclear Information System (INIS)

    Zamansky, Vladimir M.; Lissianski, Vitali V.

    2001-01-01

    This project develops Fuel-Flexible Reburning (FFR), which combines conventional reburning and Advanced Reburning (AR) technologies with an innovative method of delivering coal as the reburning fuel. The overall objective of this project is to develop engineering and scientific information and know-how needed to improve the cost of reburning via increased efficiency and minimized carbon in ash and move the FFR technology to the demonstration and commercialization stage. Specifically, the project entails: (1) optimizing FFR with injection of gasified and partially gasified fuels with respect to NO x and carbon in ash reduction; (2) characterizing flue gas emissions; (3) developing a process model to predict FFR performance; (4) completing an engineering and economic analysis of FFR as compared to conventional reburning and other commercial NO x control technologies, and (5) developing a full-scale FFR design methodology. The project started in August 2000 and will be conducted over a two-year period. The work includes a combination of analytical and experimental studies to identify optimum process configurations and develop a design methodology for full-scale applications. The first year of the program included pilot-scale tests to evaluate performances of two bituminous coals in basic reburning and modeling studies designed to identify parameters that affect the FFR performance and to evaluate efficiency of coal pyrolysis products as a reburning fuel. Tests were performed in a 300 kW Boiler Simulator Facility to characterize bituminous coals as reburning fuels. Tests showed that NO x reduction in basic coal reburning depends on process conditions, initial NO x and coal type. Up to 60% NO x reduction was achieved at optimized conditions. Modeling activities during first year concentrated on the development of coal reburning model and on the prediction of NO x reduction in reburning by coal gasification products. Modeling predicted that composition of coal

  9. FY 1998 annual report on the survey on overseas geological structures. Project for exchanging engineers (coal mining technology area) (Vietnam); 1998 nendo kaigai chishitsu kozo nado chosaa. Gijutsusha koryu jigyo (tanko gijutsu bun'ya) (Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The project for exchanging engineers has been implemented, in order to improve production and managemental techniques of coal mining engineers in the Asia-Pacific region, promote smooth and efficient projects for surveying overseas geological structures, and facilitate stable supply of overseas coal to Japan. The FY 1998 project was concentrated on Vietnam, to which Japanese coal mining engineers were sent, and from which production management engineers were invited to Japan as trainees. The Japanese engineers sent to Vietnam educated the underground coal mining techniques. The Vietnamese management engineers invited were trained for, e.g., production management techniques (e.g., those for workplaces and organizations) in the Japanese mines, administrative management techniques, and techniques to improve safety and productivity in the mines. Coal Energy Center and Taiheiyo Mining's Kushiro Mine provided training facilities. (NEDO)

  10. FY 1981 Report on the results of Sunshine Project. Research and development of techniques for liquefaction of coal (Development of extraction type liquefaction plant using brown coal-based solvent and researches on milling at high temperature in oil); 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu, kattankei yozai chushutsu ekika plant no kaihatsu seika hokokusho. Koon yuchu funsai no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    This program is aimed at establishment of the techniques for milling of brown coal treated by primary dehydration and slurry adjustment, and secondary hydration plant, as part of the project for developing the techniques for liquefaction of brown coal. Brown coal (Australian Yallourn coal) treated by primary dehydration, solvents (creosote and decrystallized anthracene), and catalysts are used as the stock samples, to investigate the coal characteristics with respect to milling crushability, dehydration and liquefaction reactivity, and the slurries are prepared by changing coal charge rate, solvent and preparation temperature, to collect the data regarding, e.g., coal concentration, coal particle size, moisture level and liquefaction reactivity. It is found that milling crushability tends to decrease as coal charge rate or solvent/coal ratio increases whether creosote or decrystallized anthracene is used as the solvent. Milling crushability is unaffected by slurry preparation temperature. Content of residual moisture in the slurry decreases to 1% or less, when slurry preparation temperature is increased to 100 degrees C or higher. Liquefaction reactivity of the slurry shows slight dependence on slurry preparation temperature, when it is increased to 180 degrees C. (NEDO)

  11. Characterizing near-surface CO2 conditions before injection - Perspectives from a CCS project in the Illinois Basin, USA

    Science.gov (United States)

    Locke, R.A.; Krapac, I.G.; Lewicki, J.L.; Curtis-Robinson, E.

    2011-01-01

    The Midwest Geological Sequestration Consortium is conducting a large-scale carbon capture and storage (CCS) project in Decatur, Illinois, USA to demonstrate the ability of a deep saline formation to store one million tonnes of carbon dioxide (CO2) from an ethanol facility. Beginning in early 2011, CO2 will be injected at a rate of 1,000 tonnes/day for three years into the Mount Simon Sandstone at a depth of approximately 2,100 meters. An extensive Monitoring, Verification, and Accounting (MVA) program has been undertaken for the Illinois Basin Decatur Project (IBDP) and is focused on the 0.65 km2 project site. Goals include establishing baseline conditions to evaluate potential impacts from CO2 injection, demonstrating that project activities are protective of human health and the environment, and providing an accurate accounting of stored CO2. MVA efforts are being conducted pre-, during, and post- CO2 injection. Soil and net CO2 flux monitoring has been conducted for more than one year to characterize near-surface CO2 conditions. More than 2,200 soil CO2 flux measurements have been manually collected from a network of 118 soil rings since June 2009. Three ring types have been evaluated to determine which type may be the most effective in detecting potential CO 2 leakage. Bare soil, shallow-depth rings were driven 8 cm into the ground and were prepared to minimize surface vegetation in and near the rings. Bare soil, deep-depth rings were prepared similarly, but were driven 46 cm. Natural-vegetation, shallow-depth rings were driven 8 cm and are most representative of typical vegetation conditions. Bare-soil, shallow-depth rings had the smallest observed mean flux (1.78 ??mol m-2 s-1) versus natural-vegetation, shallow-depth rings (3.38 ??mol m-2 s-1). Current data suggest bare ring types would be more sensitive to small CO2 leak signatures than natural ring types because of higher signal to noise ratios. An eddy covariance (EC) system has been in use since June

  12. Integrated engineering and cost model for management of coal combustion byproducts

    Energy Technology Data Exchange (ETDEWEB)

    Sevim, H. [Department of Mining Engineering, Southern Illinois University at Carbondale, Carbondale, Illinois (United States); Renninger, S. [US Department of Energy, Morgantown Energy Technology Center, Morgantown, West Virginia (United States)

    1998-07-01

    An integrated engineering and cost model has been developed as a part of an overall research project for exploring the technical, environmental and economic feasibility of disposing coal combustion byproducts and flue gas desulfurisation products in underground coal mines in Illinois. The features of the model have been keyed in user-friendly software. In this paper, the purpose and the structure of the model are described. The capabilities of the software are illustrated through an example involving transportation of byproducts in containers from a power plant to a mine site, and subsequent placement of the byproducts in a abandoned underground coal mine using a hydraulic injection system. 3 refs.

  13. Report on the research achievements in the Sunshine Project in fiscal 1992. Studies on improving the efficiency of coal gasification; 1992 nendo sekitan gas ka no kokoritsuka ni kansuru kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1992 in studies on improving the efficiency of coal gasification. Three kinds of coals were gasified under the atmosphere of hydrogen, He or CO2 by using the TPR method. The sulfur removing rate varies depending on coals even under the same reaction atmosphere, and so does the degree of influence of the atmospheric gases depending on coals. Very little effect of the atmospheric gases was found on the sulfur removing rate in Taiheiyo and Wandoan coals. While Tatung coal presents the same removing rate under the atmosphere of He and CO2, it shows 1.8 times greater removing rate under the hydrogen atmosphere. Generation patterns for H{sub 2}S and COS also vary depending on coal types and atmospheric gases. Inorganic sulfur shows the same behavior in the reaction process regardless of coal type and atmosphere, but organic sulfur behaves differently. The sulfur removing rate is determined by how easily the organic sulfur can be removed, which attributes to the difference in kinds and structures of organic sulfur compounds in the coal, together with the gas generation patterns. In order to discuss gasification of char, investigations were performed on effects of coal types and heat treatment temperatures, with regard to the gasification characteristics that can be estimated from the industrial and element analyses. (NEDO)

  14. Geothermal Injection Monitoring Project. Phase I status report, April 1981-April 1982

    Energy Technology Data Exchange (ETDEWEB)

    Younker, L.; Hanson, J.; Didwall, E.; Kasameyer, P.; Smith, A.; Hearst, J.; Daily, W.; Crow, N.; Younker, J.; Murray, W.

    1982-08-13

    The feasibility of using remote geophysical techniques to monitor the movement of injected brine has been evaluated. It was established that no single approach is likely to be identified that can be used to accurately monitor the precise location of the injected fluid. Several approaches have been considered in parallel because they add new dimensions to the existing monitoring capabilities, and are likely to cover a range of applications at a variety of geothermal sites. These include: microseismicity - a seismic net is used to record small magnitude events associated with injection; streaming potential - self potential anomalies produced by a moving fluid identify fluid flow direction; cross borehole geotomography - two-dimensional image of flow pathways is constructed using electromagnetic waves; and well pressure response to solid earth tide - changes in pore pressures are used to discriminate fracture/pore porosity and estimate fracture orientations.

  15. Federal Government response to the September 12, 2000 environmental assessment report of the EUB-CEAA Joint Review Panel on the Cheviot Coal Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-04-01

    The Federal Court noted four deficiencies in the joint EUB-CEAA environmental review dated September 12, 2000 for the Cheviot Coal Project. The Joint Review Panel reconvened to hear additional evidence about these deficiencies. This memorandum to cabinet comprises the Government of Canada's response to the additional evidence. Some of the Panel's recommendations are accepted. Comments are included regarding migratory birds, protection of traditional aboriginal sites, economic benefits, grizzly bears, and fish habitat.

  16. Coal: the dinosaur wakes up

    International Nuclear Information System (INIS)

    Rousseau, Y.; Cosnard, D.

    2005-01-01

    In western countries, coal is considered as an industry of the past, but at the Earth's scale the situation is radically the opposite. Since three years, coal is the faster developing energy source, in particular thanks to China expansion and to the oil crisis which makes coal more competitive. This short paper presents the situation of coal mining in China: projects, working conditions and environmental impact. (J.S.)

  17. Coal surface control for advanced physical fine coal cleaning technologies

    Energy Technology Data Exchange (ETDEWEB)

    Morsi, B.I.; Chiang, S.H.; Sharkey, A.; Blachere, J.; Klinzing, G.; Araujo, G.; Cheng, Y.S.; Gray, R.; Streeter, R.; Bi, H.; Campbell, P.; Chiarlli, P.; Ciocco, M.; Hittle, L.; Kim, S.; Kim, Y.; Perez, L.; Venkatadri, R.

    1992-01-01

    This final report presents the research work carried out on the Coal Surface Control for Advanced Physical Fine Coal Cleaning Technologies project, sponsored by the US Department of Energy, Pittsburgh Energy Technology Center (DOE/PETC). The project was to support the engineering development of the selective agglomeration technology in order to reduce the sulfur content of US coals for controlling SO[sub 2] emissions (i.e., acid rain precursors). The overall effort was a part of the DOE/PETCs Acid Rain Control Initiative (ARCI). The overall objective of the project is to develop techniques for coal surface control prior to the advanced physical fine coal cleaning process of selective agglomeration in order to achieve 85% pyrite sulfur rejection at an energy recovery greater than 85% based on run-of-mine coal. The surface control is meant to encompass surface modification during grinding and laboratory beneficiation testing. The project includes the following tasks: Project planning; methods for analysis of samples; development of standard beneficiation test; grinding studies; modification of particle surface; and exploratory R D and support. The coal samples used in this project include three base coals, Upper Freeport - Indiana County, PA, Pittsburgh NO. 8 - Belmont County, OH, and Illinois No. 6 - Randolph County, IL, and three additional coals, Upper Freeport - Grant County- WV, Kentucky No. 9 Hopkins County, KY, and Wyodak - Campbell County, WY. A total of 149 drums of coal were received.

  18. Environmentally friendly type coal utilization technology transfer project. Downstream field; Kankyo chowagata sekitan riyo gijutsu iten jigyo. Karyu bun`ya

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The paper arranged the result of the clean coal technology transfer project carried out during October to December, 1996. For the purpose of supporting introduction/spread of clean coal technology (CCT) in Asian and Pacific countries, the project invited engineers of the countries to Japan, aiming at fermentation of the understanding of CCT and improvement in ability. The project was held by NEDO and managed by Center for Coal Utilization, Japan. The manager course is for policy decision makers, management and senior management (plant manager class). By taking up CCT assessment and a menu of economical efficiency, prepared was the environment to which CCT is introduced in case of working out policy and planning plant/equipment investment. Moreover, the engineer course is for policy planners, medium-class management (section chief class), senior engineers (planners), and takes up materials for judgment in case of planning CCT facilities and proposing measures to reduce environmental loads by management and improvement of facilities at the same time. Fifteen engineers were invited: 6 from China, 3 from Indonesia, 3 from the Philippines, and 3 from Thailand

  19. The Indonesian coal industry

    International Nuclear Information System (INIS)

    Cook, A.; Daulay, B.

    2000-01-01

    In this comprehensive article the authors describe the origins and progress of the Indonesian coal industry and the role it plays, and will play, in the domestic energy scene and world coal trade. In the '80s, the Indonesian coal industry laid the basis for major expansion such that coal production rose from under a million tonnes in 1983 to 10.6 million tonnes in 1990, 50.9 million tonnes by 1996 and 61.2 million tonnes in 1992. At the same time, exports have increased from 0.4 million tonnes to 44.8 million tonnes. Current export levels are higher than originally expected, due in part to a slow down in the construction of electric power stations and a partial switch to natural gas. This has slowed the rate at which domestic coal demand has built up. The majority of coals currently exported are low rank steam coals, but some of the higher rank and very low ash coals are used for blast furnace injection, and a very small proportion may even be used within coking blends, even though they have poor coking properties. The Indonesian coal industry has developed very rapidly over the last six years to become a significant exporter, especially within the ASEAN context. The resources base appears to be large enough to support further increases in production above those already planned. It is probable that resources and reserves can be increased above the current levels. It is likely that some reserves of high value coals can be found, but it is also probable that the majority of additions to reserves will be lower in rank (and therefore quality) compared with the average of coals currently being mined. Reserves of qualities suitable for export will support that industry for a considerable period of time. However, in the longer term, the emphasis of production will increasingly swing to the domestic market

  20. Measurement of batter movements in brown coal open cuts - results of a research project

    Energy Technology Data Exchange (ETDEWEB)

    Nehring, H

    1984-05-01

    In the course of a research project sponsored by the State of North Rhine-Westphalia the mine surveying methods used when measuring deformation on open cut batters were further developed, by taking into account the special conditions prevailing in open cuts, to such an extent that the essential monitoring of soil movements can be carried out reliably and promptly. As an integral part of an optimised, accurate geodetic measurement of points, the direct measurement of longitude across the open cut was introduced as a rapid measuring method. The aerophotogrammetric measurement of points is practically as accurate as terrestrial surveying. The author describes the prototype of an automatically operated instrument system for the monitoring of points. In conclusion he also stresses that the first promising advance has already been made as regards the sufficiently accurate monitoring of rock movements in boreholes.

  1. MINIMIZATION OF CARBON LOSS IN COAL REBURNING

    Energy Technology Data Exchange (ETDEWEB)

    Vladimir Zamansky; Vitali Lissianski; Pete Maly; Richard Koppang

    2002-09-10

    This project develops Fuel-Flexible Reburning (FFR) technology that is an improved version of conventional reburning. In FFR solid fuel is partially gasified before injection into the reburning zone of a boiler. Partial gasification of the solid fuel improves efficiency of NO{sub x} reduction and decreases LOI by increasing fuel reactivity. Objectives of this project were to develop engineering and scientific information and know-how needed to improve the cost of reburning via increased efficiency and minimized LOI and move the FFR technology to the demonstration and commercialization stage. All project objectives and technical performance goals have been met, and competitive advantages of FFR have been demonstrated. The work included a combination of experimental and modeling studies designed to identify optimum process conditions, confirm the process mechanism and to estimate cost effectiveness of the FFR technology. Experimental results demonstrated that partial gasification of a solid fuel prior to injection into the reburning zone improved the efficiency of NO{sub x} reduction and decreased LOI. Several coals with different volatiles content were tested. Testing suggested that incremental increase in the efficiency of NO{sub x} reduction due to coal gasification was more significant for coals with low volatiles content. Up to 14% increase in the efficiency of NO{sub x} reduction in comparison with basic reburning was achieved with coal gasification. Tests also demonstrated that FFR improved efficiency of NO{sub x} reduction for renewable fuels with high fuel-N content. Modeling efforts focused on the development of the model describing reburning with gaseous gasification products. Modeling predicted that the composition of coal gasification products depended on temperature. Comparison of experimental results and modeling predictions suggested that the heterogeneous NO{sub x} reduction on the surface of char played important role. Economic analysis confirmed

  2. MINIMIZATION OF CARBON LOSS IN COAL REBURNING

    International Nuclear Information System (INIS)

    Vladimir Zamansky; Vitali Lissianski; Pete Maly; Richard Koppang

    2002-01-01

    This project develops Fuel-Flexible Reburning (FFR) technology that is an improved version of conventional reburning. In FFR solid fuel is partially gasified before injection into the reburning zone of a boiler. Partial gasification of the solid fuel improves efficiency of NO x reduction and decreases LOI by increasing fuel reactivity. Objectives of this project were to develop engineering and scientific information and know-how needed to improve the cost of reburning via increased efficiency and minimized LOI and move the FFR technology to the demonstration and commercialization stage. All project objectives and technical performance goals have been met, and competitive advantages of FFR have been demonstrated. The work included a combination of experimental and modeling studies designed to identify optimum process conditions, confirm the process mechanism and to estimate cost effectiveness of the FFR technology. Experimental results demonstrated that partial gasification of a solid fuel prior to injection into the reburning zone improved the efficiency of NO x reduction and decreased LOI. Several coals with different volatiles content were tested. Testing suggested that incremental increase in the efficiency of NO x reduction due to coal gasification was more significant for coals with low volatiles content. Up to 14% increase in the efficiency of NO x reduction in comparison with basic reburning was achieved with coal gasification. Tests also demonstrated that FFR improved efficiency of NO x reduction for renewable fuels with high fuel-N content. Modeling efforts focused on the development of the model describing reburning with gaseous gasification products. Modeling predicted that the composition of coal gasification products depended on temperature. Comparison of experimental results and modeling predictions suggested that the heterogeneous NO x reduction on the surface of char played important role. Economic analysis confirmed economic benefits of the FFR

  3. Report on the achievements in the Sunshine Project in fiscal 1991 on research and development of coal energy. Studies on coal liquefying catalysts and a method for analyzing liquefied oil; 1991 nendo sekitan ekikayo shokubai oyobi ekikayu bunseikiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1991 on research of coal liquefying catalysts and a method for analyzing liquefied oil. Alkalis and alkali earth metals present during coal liquefied oil hydrogenation treatment deteriorate the activity remarkably as an effect of metal deposition from an Mo-based catalyst on the activity deterioration. Discussions were given on hydrogenating decomposition paths for bi-cyclic compounds by using reaction of model substances. Preliminary discussions were given jointly under the Japanese and Canadian technical cooperation on enhancing the quality of co-treated oil in the coal liquefaction, and on catalysts used therein. A 1-t/d PSU circulating solvent was studied to support the NEDO's bituminous coal liquefaction program. Analyses were carried out on acenaphthenes, biphenyls, phenanthrenes, and anthracenes in the oil liquefied from Wandoan coal. Discussions were given on CoMo/Al{sub 2}O{sub 3} on the effects of catalyst concentrations and particle sizes in the coal liquefying reaction. In order to elucidate different non-covalently bonded high-order structures of coal polymer assemblies, chemical treatment was applied to coals under a relatively mild condition (room temperature to 150 degrees C). Chemical structures as a result of the non-covalent bond in the coals were investigated from change due to the treatment in the pyridine extraction characteristics. (NEDO)

  4. Report on the achievements in the Sunshine Project in fiscal 1991 on research and development of coal energy. Studies on coal liquefying catalysts and a method for analyzing liquefied oil; 1991 nendo sekitan ekikayo shokubai oyobi ekikayu bunseikiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1991 on research of coal liquefying catalysts and a method for analyzing liquefied oil. Alkalis and alkali earth metals present during coal liquefied oil hydrogenation treatment deteriorate the activity remarkably as an effect of metal deposition from an Mo-based catalyst on the activity deterioration. Discussions were given on hydrogenating decomposition paths for bi-cyclic compounds by using reaction of model substances. Preliminary discussions were given jointly under the Japanese and Canadian technical cooperation on enhancing the quality of co-treated oil in the coal liquefaction, and on catalysts used therein. A 1-t/d PSU circulating solvent was studied to support the NEDO's bituminous coal liquefaction program. Analyses were carried out on acenaphthenes, biphenyls, phenanthrenes, and anthracenes in the oil liquefied from Wandoan coal. Discussions were given on CoMo/Al{sub 2}O{sub 3} on the effects of catalyst concentrations and particle sizes in the coal liquefying reaction. In order to elucidate different non-covalently bonded high-order structures of coal polymer assemblies, chemical treatment was applied to coals under a relatively mild condition (room temperature to 150 degrees C). Chemical structures as a result of the non-covalent bond in the coals were investigated from change due to the treatment in the pyridine extraction characteristics. (NEDO)

  5. Coal liquefaction becomes viable

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-11-15

    In 2003 the May/June issue of CoalTrans International speculated that coal liquefaction would become viable due to falling coal prices. This has not proved the case but the sustained high oil price is sparking new interest. A survey by Energy Intelligence and Marketing Research during November 2005 revealed a growth in the number of projects under development or at the feasibility stage. The article reports projects in China, the USA, Australia, New Zealand, the Philippines and India. China is commissioning the first wave of large liquefaction plants. The key question is whether other countries, particularly the USA, will follow.

  6. The Cedar Project: Historical trauma, sexual abuse and HIV risk among young Aboriginal people who use injection and non-injection drugs in two Canadian cities☆

    Science.gov (United States)

    For the Cedar Project Partnership; Pearce, Margo E.; Christian, Wayne M.; Patterson, Katharina; Norris, Kat; Moniruzzaman, Akm; Craib, Kevin J.P.; Schechter, Martin T.; Spittal, Patricia M.

    2016-01-01

    Recent Indigenist scholarship has situated high rates of traumatic life experiences, including sexual abuse, among Indigenous peoples of North America within the larger context of their status as colonized peoples. Sexual abuse has been linked to many negative health outcomes including mental, sexual and drug-related vulnerabilities. There is a paucity of research in Canada addressing the relationship between antecedent sexual abuse and negative health outcomes among Aboriginal people including elevated risk of HIV infection. The primary objectives of this study were to determine factors associated with sexual abuse among participants of the Cedar Project, a cohort of young Aboriginal people between the ages of 14 and 30 years who use injection and non-injection drugs in two urban centres in British Columbia, Canada; and to locate findings through a lens of historical and intergenerational trauma. We utilized post-colonial perspectives in research design, problem formulation and the interpretation of results. Multivariate modeling was used to determine the extent to which a history of sexual abuse was predictive of negative health outcomes and vulnerability to HIV infection. Of the 543 eligible participants, 48% reported ever having experienced sexual abuse; 69% of sexually abused participants were female. The median age of first sexual abuse was 6 years for both female and male participants. After adjusting for sociodemographic variables and factors of historical trauma, sexually abused participants were more likely to have ever been on the streets for more than three nights, to have ever self-harmed, to have suicide ideation, to have attempted suicide, to have a diagnosis of mental illness, to have been in the emergency department within the previous 6 months, to have had over 20 lifetime sexual partners, to have ever been paid for sex and to have ever overdosed. The prevalence and consequences of sexual abuse among Cedar Project participants are of grave concern

  7. Technical data. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This volume includes a description of the railway to transport the coal; possible unbalance in the electrical power supply is considered in detail, as well as communications, signalling, etc. The railway will also be used to transport ashes and sludges for waste disposal. Coal fines in the coal supply will be burned to generate power. A very brief description of the coal gasification plant and its components is accompanied by a printout of the dates final engineering is to be completed. Permit applications are listed and socio-economic factors are discussed. The financing plan is discussed in some detail: basically, a loan guarantee from the Synthetic Fuels Corporation; equity provided by investment tax credit, deferred taxes, AFUDC and the sponsors; price support; and gas purchase agreement (this whole section includes several legal details.). (LTN)

  8. Projections of Demand for Waterborne Transportation, Ohio River Basin, 1980, 1990, 2000, 2020, 2040. Volume 3. Group I. Coal & Coke.

    Science.gov (United States)

    1980-12-01

    of Ohio. In 1976, it accounted for 77.1 𔄁| --. 1- percent of metal lurgi al d(oal consumpt in i ir tiv PSAs IIt heI mlo , comsumIng areas tI metal I...Model" "A Behavioral Description of the FOSSIL 1 Model" "Implemention of the EMF’s ’Coal in Transition’ Scenarios with the Gulf/SRI Model" Coal in

  9. TVA coal-gasification commercial demonstration plant project. Volume 5. Plant based on Koppers-Totzek gasifier. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    This volume presents a technical description of a coal gasification plant, based on Koppers-Totzek gasifiers, producing a medium Btu fuel gas product. Foster Wheeler carried out a conceptual design and cost estimate of a nominal 20,000 TPSD plant based on TVA design criteria and information supplied by Krupp-Koppers concerning the Koppers-Totzek coal gasification process. Technical description of the design is given in this volume.

  10. NEDO coal resources exploitation subcommittee. 18th project report meeting; NEDO sekitan shigen kaihatsu bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    In a report on a 'survey for coal transportation system optimization in southern Sumatra' which is to contribute to the improvement of coal exploitation efficiency in the Musi river area in southern Sumatra, the coal transportation system from the coal mine to the harbor is reviewed, scenarios on funding and cost effectiveness and environmental impact are comprehensively examined, and suggestions are submitted for higher efficiency and cost effectiveness. In a report on a 'current utilization status and effectiveness of a non-destructive electromagnetic vibrator shock source,' an electromagnetic vibrator shock source out of several new coal exploration technologies which are combinations of test boring and seismic prospecting is taken up, and is compared, in terms of technical feature and cost effectiveness, with the seismic reflection survey technique that uses an explosive shock source, and then a conclusion is reported that an electromagnetic vibration shock source method is superior. Using the new electromagnetic method, a seismic wave frequency is so chosen as to be suitable for a given depth. Since it is non-destructive and emits less noise, it is expected that it will serve in various fields other than coal mining. (NEDO)

  11. The utility of three-dimensional optical projection tomography in nerve injection injury imaging

    Czech Academy of Sciences Publication Activity Database

    Cvetko, E.; Čapek, Martin; Damjanovska, M.; Reina, M. A.; Eržen, I.; Stopar-Pintarič, T.

    2015-01-01

    Roč. 70, č. 8 (2015), s. 939-947 ISSN 0003-2409 R&D Projects: GA ČR(CZ) GA13-12412S; GA MŠk(CZ) LH13028 Institutional support: RVO:67985823 Keywords : optical projection tomography * 3D nerve visualization * nerve disruption Subject RIV: EA - Cell Biology Impact factor: 3.794, year: 2015

  12. Violet Grove CO{sub 2} injection project : monitoring with timelapse VSP surveys

    Energy Technology Data Exchange (ETDEWEB)

    Coueslan, M.; Lawton, D. [Calgary Univ., Calgary, AB (Canada); Jones, M. [Schlumberger Canada Ltd., Calgary, AB (Canada)

    2006-07-01

    Several oil and gas fields in western Canada have been depleted through primary production and secondary recovery methods. Injecting carbon dioxide (CO{sub 2}) into a reservoir can enhance oil recovery (EOR) and has the potential benefit of CO{sub 2} sequestration, which reduces greenhouse gas emissions into the atmosphere. It has been estimated that western Canada has a practical CO{sub 2} storage capacity of about 3.3 Gt in its oil and gas reservoirs. In order to claim a reduction in CO{sub 2} emissions, however, the injected CO{sub 2} must be monitored to prove that it is being trapped in these reservoirs. For that reason, the Violet Grove site, near Drayton Valley, Alberta was chosen as a pilot site to study CO{sub 2} injection into a reservoir for enhanced recovery and carbon sequestration purposes. The reservoir is located in the Cardium Formation in the Pembina Field. It was expected that the CO{sub 2} would flow preferentially in the reservoir's dominant fracture orientation, which is northeast-southwest. Simultaneously acquired time-lapse multicomponent surface and borehole seismic surveys were used to monitor changes in the reservoir. Prior to CO{sub 2} injection, a baseline survey was acquired in March 2005. A second survey was acquired 8 months after CO{sub 2} injection. The borehole seismic data displayed higher bandwidth and increased resolution compared to the surface seismic data. The PS-wave borehole seismic data in particular showed much better results. Together, these seismic surveys provide lateral coverage of the area as well as high resolution images near the observation well. Preliminary results from the time-lapse analysis show an increase of 30 to 60 per cent in the reservoir reflectivity amplitudes in the 8 months between the baseline and monitor surveys, suggesting that the CO{sub 2} flood has progressed southwest of the injector, most likely along the dominant fracture trend. 7 refs., 5 figs.

  13. Coal Corporation of Victoria annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Information is presented on operations, strategic planning, brown coal production and finance. Divisional reports are presented for the following divisions of the Coal Corporation of Victoria: marketing, technical marketing and special projects, research and development, and corporate services. The activities of the technical marketing and special projects division are discussed under the following headings: the coal for industry programme, the Brown Coal Liquefaction (Victoria) Pty. Ltd. project, dried brown coal activities, and resource development planning and policy activities. The corporation is currently conducting research into the following areas: ion exchange materials, activated carbons, and horticultural and agricultural applications of brown coal.

  14. Clean Coal Technology Demonstration Program. Program update 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The Clean Coal Technology Demonstration Program (CCT Program) is a $7.14 billion cost-shared industry/government technology development effort. The program is to demonstrate a new generation of advanced coal-based technologies, with the most promising technologies being moved into the domestic and international marketplace. Clean coal technologies being demonstrated under the CCT program are creating the technology base that allows the nation to meet its energy and environmental goals efficiently and reliably. The fact that most of the demonstrations are being conducted at commercial scale, in actual user environments, and under conditions typical of commercial operations allows the potential of the technologies to be evaluated in their intended commercial applications. The technologies are categorized into four market sectors: advanced electric power generation systems; environmental control devices; coal processing equipment for clean fuels; and industrial technologies. Sections of this report describe the following: Role of the Program; Program implementation; Funding and costs; The road to commercial realization; Results from completed projects; Results and accomplishments from ongoing projects; and Project fact sheets. Projects include fluidized-bed combustion, integrated gasification combined-cycle power plants, advanced combustion and heat engines, nitrogen oxide control technologies, sulfur dioxide control technologies, combined SO{sub 2} and NO{sub x} technologies, coal preparation techniques, mild gasification, and indirect liquefaction. Industrial applications include injection systems for blast furnaces, coke oven gas cleaning systems, power generation from coal/ore reduction, a cyclone combustor with S, N, and ash control, cement kiln flue gas scrubber, and pulse combustion for steam coal gasification.

  15. Fiscal 2000 survey report on project for promoting international cooperation. Survey on coal utilization in APEC region (Coal note); 2000 nendo kokusai kyoryoku suishin jigyo chosa hokokusho. APEC iki nai ni okeru sekitan riyo jokyo tou chosa (Koru note)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With the purpose of contributing to the infrastructure for promoting clean coal technology (CCT), there were compiled as the 'coal note' various kinds of coal-related information in China, Indonesia, Philippine, Thailand and Vietnam among APEC countries. Concerning China, for example, economic growth and energy supply/demand in the category of the energy outline were described in detail; as were the guiding principle. individual guidance plan, and specific energy policy of the 10th five year plan, in the category of the energy policy; coal deposits, geological summary, coal quality in each coal forming period, and the status quo of development, in the category of the coal mines and development; coal supply/demand, production, consumption, and export, in the category of the present status of the coal industry; producers, sales, quality of product coal, distribution, and price, in the category of the domestic supply; present state of environmental problems relating to coal, and environmental measures intended for coal, in the category of the coal-related environmental issues; and development, production, coal cleaning, quality control, safety control, and utilization (combustion, liquefaction and gasification), in the category of coal utilization technology, respectively. (NEDO)

  16. Enhanced coal bed methane production and sequestration of CO2 in unmineable coal

    Energy Technology Data Exchange (ETDEWEB)

    Locke, James [CONSOL Energy Inc., South Park, PA (United States); Winschel, Richard [CONSOL Energy Inc., South Park, PA (United States)

    2005-03-01

    The Marshall County Project was undertaken by CONSOL Energy Inc. (CONSOL) with partial funding from the U. S. Department of Energy’s (DOE) Carbon Storage Program (CSP). The project, initiated in October 2001, was conducted to evaluate opportunities for carbon dioxide CO2 sequestration in an unmineable coal seam in the Northern Appalachian Basin with simultaneous enhanced coal bed methane recovery. This report details the final results from the project that established a pilot test in Marshall County, West Virginia, USA, where a series of coal bed methane (CBM) production wells were developed in an unmineable coal seam (Upper Freeport (UF)) and the overlying mineable Pittsburgh (PIT) seam. The initial wells were drilled beginning in 2003, using slant-hole drilling procedures with a single production leg, in a down-dip orientation that provided limited success. Improved well design, implemented in the remaining wells, allowed for greater CBM production. The nearly-square-shaped project area was bounded by the perimeter production wells in the UF and PIT seams encompassing an area of 206 acres. Two CBM wells were drilled into the UF at the center of the project site, and these were later converted to serve as CO2 injection wells through which, 20,000 short tons of CO2 were planned to be injected at a maximum rate of 27 tons per day. A CO2 injection system comprised of a 50-ton liquid CO2 storage tank, a cryogenic pump, and vaporization system was installed in the center of the site and, after obtaining a Class II underground injection permit (UIC) permit from the West Virginia Department of Environmental Protection (WVDEP), CO2 injection, through the two center wells, into the UF was initiated in September 2009. Numerous complications limited CO2 injection continuity, but CO2 was injected until breakthrough was encountered in September 2013, at which point the project had achieved an injection total of 4,968 tons of CO2. During the injection and post-injection

  17. FY 2000 report on the survey of geological structures overseas, etc. Volume 2. 'Tanjung Enim IV Coal Exploration Project between Japan and Indonesia'; 2000 nendo kaigai chishitsu kozo chosa hokokusho. 2. Nippon Indonesia sekitan kyodo tansa Tanjung Enim project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The survey was finished in the final fiscal year (FY 2000) of the Tanjung Enim IV Coal Exploration Project between Japan and Indonesia, and a report was summarized on the preliminary coal mining plan. In the design of the optimum mining area and pit, in terms of 3 cases of coal price of $8, $10, and $12/ton, the pit design was made considering rivers, houses, power transmission lines, etc., and the actual coal yield was asked. In the case of coal price of $8/ton, the actual coal yield in pit was 315 million tons in north block and 171 million tons in south block. In the case of coal price of $10/ton, pits are expandable in north block, but not in south block. For all the pit shapes designed, long-term mining plans were worked out. In each of the cases of coal production amount of 1 million, 3 million and 5 million tons, indicated were secular changes in overburden amount and coal quality because of the difference in mining direction. Further studies were made on the deposition plan, simulation of models of mining heavy machines, coal mine facilities, economical efficiency of coal mines, etc. (NEDO)

  18. Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

    Science.gov (United States)

    Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm

    2017-09-01

    The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

  19. New coal

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    Specially dedicated to coal, this edition comprises a series of articles of general interest dealing with the position of the French coalmining industry (interview with M.P. Gardent), the coal market in France, the work of CERCHAR, etc. New techniques, in-situ gasification of deep coal, gasification of coal by nuclear methods, the conversion of coal into petrol, the Emile Huchet power plant of Houilleres du Bassin de Lorraine, etc., are dealt with.

  20. Coal upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, S. [IEA Clean Coal Centre, London (United Kingdom)

    2009-10-15

    This report examines current technologies and those likely to be used to produce cleaner coal and coal products, principally for use in power generation and metallurgical applications. Consideration is also given to coal production in the leading coal producing countries, both with developed and developing industries. A range of technologies are considered. These include the coal-based liquid fuel called coal water mixture (CWM) that may compete with diesel, the production of ultra-clean coal (UCC) and coal liquefaction which competes with oil and its products. Technologies for upgrading coal are considered, especially for low rank coals (LRC), since these have the potential to fill the gap generated by the increasing demand for coal that cannot be met by higher quality coals. Potential advantages and downsides of coal upgrading are outlined. Taking into account the environmental benefits of reduced pollution achieved through cleaner coal and reduced transport costs, as well as other positive aspects such as a predictable product leading to better boiler design, the advantages appear to be significant. The drying of low rank coals improves the energy productively released during combustion and may also be used as an adjunct or as part of other coal processing procedures. Coal washing technologies vary in different countries and the implications of this are outlined. Dry separation technologies, such as dry jigging and electrostatic separation, are also described. The demonstration of new technologies is key to their further development and demonstrations of various clean coal technologies are considered. A number of approaches to briquetting and pelletising are available and their use varies from country to country. Finally, developments in upgrading low rank coals are described in the leading coal producing countries. This is an area that is developing rapidly and in which there are significant corporate and state players. 81 refs., 32 figs., 3 tabs.

  1. Techno-Economic Analysis of Scalable Coal-Based Fuel Cells

    Energy Technology Data Exchange (ETDEWEB)

    Chuang, Steven S. C. [Univ. of Akron, OH (United States)

    2014-08-31

    Researchers at The University of Akron (UA) have demonstrated the technical feasibility of a laboratory coal fuel cell that can economically convert high sulfur coal into electricity with near zero negative environmental impact. Scaling up this coal fuel cell technology to the megawatt scale for the nation’s electric power supply requires two key elements: (i) developing the manufacturing technology for the components of the coal-based fuel cell, and (ii) long term testing of a kW scale fuel cell pilot plant. This project was expected to develop a scalable coal fuel cell manufacturing process through testing, demonstrating the feasibility of building a large-scale coal fuel cell power plant. We have developed a reproducible tape casting technique for the mass production of the planner fuel cells. Low cost interconnect and cathode current collector material was identified and current collection was improved. In addition, this study has demonstrated that electrochemical oxidation of carbon can take place on the Ni anode surface and the CO and CO2 product produced can further react with carbon to initiate the secondary reactions. One important secondary reaction is the reaction of carbon with CO2 to produce CO. We found CO and carbon can be electrochemically oxidized simultaneously inside of the anode porous structure and on the surface of anode for producing electricity. Since CH4 produced from coal during high temperature injection of coal into the anode chamber can cause severe deactivation of Ni-anode, we have studied how CH4 can interact with CO2 to produce in the anode chamber. CO produced was found able to inhibit coking and allow the rate of anode deactivation to be decreased. An injection system was developed to inject the solid carbon and coal fuels without bringing air into the anode chamber. Five planner fuel cells connected in a series configuration and tested. Extensive studies on the planner fuels

  2. Differential behavioral profile induced by the injection of dipotassium chlorazepate within brain areas that project to the nucleus accumbens septi.

    Science.gov (United States)

    Llano López, Luis H; Caif, Fernando; Fraile, Miriam; Tinnirello, Belén; de Gargiulo, Adriana I Landa; Lafuente, José V; Baiardi, Gustavo C; Gargiulo, Pascual A

    2013-01-01

    The effect of the agonism on γ-aminobutyric acid (GABA) receptors was studied within medial prefrontal cortex (mPFC), amygdala (AMY) and ventral hipocampus (VH) in the plus-maze test in male rats bilaterally cannulated. These structures send glutamatergic projections to the nucleus accumbens septi (NAS), in which interaction and integration between these afferent pathways has been described. In a previous study of our group, blockade of glutamatergic transmission within NAS induced an anxiolytic like effect. Three rat groups received either saline or dipotassium chlorazepate (1 or 2 μg/1 μl solution) 15 min before testing. Time spent in the open arms (TSOA), time per entry (TPE), extreme arrivals (EA), open and closed arms entries (OAE, CAE) and relationship between open- and closed-arms quotient (OCAQ) were recorded. In the AMY injected group TSOA, OAE and EA were increased by the higher doses of dipotassium chlorazepate (p < 0.01). In the mPFC, TPE was decreased by both doses (p < 0.05). Injection within ventral hippocampus (VH) decreased TSOA, OAE and OCAQ with lower doses (p < 0.05). When the three studied saline groups were compared, TSOA, OAE, EA and OCAQ were enhanced in the VH group when compared to mPFC and AMY (p < 0.001). Insertion of inner canula (p < 0.001, p < 0.01, p < 0.01) and saline injection showed an increasing significant difference (p < 0.001 in all cases) with the action of guide cannula alone within VH in TSOA, OAE and EA. We conclude that the injection of dipotassium chlorazepate has a differential effect depending of the brain area, leading to facilitatory and inhibitory effects on anxiety processing.

  3. China's coal industry

    Energy Technology Data Exchange (ETDEWEB)

    Karmazin, V A

    1988-09-01

    Presents data on China's coal industry. China's coal reserves are estimated to be 4,000 million Mt; annual production is over 800 Mt. Eleven new mining projects have been recently completed. They were financed with participation of foreign capital (US$ 1,400 million). Twenty-five new mines with 32.27 Mt production capacity were planned to be put into operation in 1988. Annual coal production is expected to increase to 870 Mt in 1990 at a cost of US$ 8,500 million. Numerical data on China's individual coal basins, new schemes, capital outlay and foreign capital participation are given. The dynamic development of China's coal industry since 1949 is briefly reviewed and management methods are explained.

  4. Modeling of carbon sequestration in coal-beds: A variable saturated simulation

    International Nuclear Information System (INIS)

    Liu Guoxiang; Smirnov, Andrei V.

    2008-01-01

    Storage of carbon dioxide in deep coal seams is a profitable method to reduce the concentration of green house gases in the atmosphere while the methane as a byproduct can be extracted during carbon dioxide injection into the coal seam. In this procedure, the key element is to keep carbon dioxide in the coal seam without escaping for a long term. It is depended on many factors such as properties of coal basin, fracture state, phase equilibrium, etc., especially the porosity, permeability and saturation of the coal seam. In this paper, a variable saturation model was developed to predict the capacity of carbon dioxide sequestration and coal-bed methane recovery. This variable saturation model can be used to track the saturation variability with the partial pressures change caused by carbon dioxide injection. Saturation variability is a key factor to predict the capacity of carbon dioxide storage and methane recovery. Based on this variable saturation model, a set of related variables including capillary pressure, relative permeability, porosity, coupled adsorption model, concentration and temperature equations were solved. From results of the simulation, historical data agree with the variable saturation model as well as the adsorption model constructed by Langmuir equations. The Appalachian basin, as an example, modeled the carbon dioxide sequestration in this paper. The results of the study and the developed models can provide the projections for the CO 2 sequestration and methane recovery in coal-beds within different regional specifics

  5. Fiscal 1994 survey of the base arrangement promotion for foreign coal import. Project to heighten the quality of subbituminous coal by low temperature carbonization process; 1994 nendo kaigaitan yunyu kiban seibi sokushin chosa. Teion kanryuho ni yoru arekiseitan no kohinshitsuka jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The low-temperature carbonization process of coal is a technology to produce high grade reformed coal corresponding to bituminous coal and coal oil corresponding to heavy oil from subbituminous coal and supply them at prices close to the present market ones. From viewpoints of diversified sources and multiple export harbors, an initial-stage survey was conducted of the whole flow from new development of undeveloped mining areas in the northwest of Sumatra, Indonesia to bringing by ships to Japan of products reformed by LFC process of the US SGI`s low-temperature carbonization technology. Clean coal prepared after mining is produceable at a little higher than $12. At processing ability of 10,000 tons/day of raw coal, production is expected of approximately 5,700 tons/day of solid products of more than 6,500 kcal/kg and approximately 1,000 tons/day of low sulfur C heavy oil class oil. The finished cost of solid products is about $25/ton, which becomes about $40/ton at the harbor price in Japan. In conclusion, the project to enhance the quality of subbituminous coal by the low-temperature carbonization is promising as a total system. 10 refs., 54 figs., 30 tabs.

  6. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    International Nuclear Information System (INIS)

    Duckwitz, Noel

    2011-01-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, 'Facility Safety,' and the expectations of DOE-STD-1189-2008, 'Integration of Safety into the Design Process,' provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  7. Fiscal 1995 survey report on the environmentally friendly type coal utilization system introduction support project. Verification project on the circulating fluidized bed boiler; Kankyo chowagata sekitan riyo system donyu shien jigyo. Junkan ryudosho boiler ni kakawaru jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    In relation to the circulating fluidized bed boiler which reduces the amount of sulfur oxides emitted in coal utilization, a verification project was carried out on installation of the equipment and spread activity in China and the Philippines contributing to the control of environmental pollutant associated with coal utilization and the effective use of energy. At the Fanshan area, installed was a 10t/h internal circulating fluidized bed boiler. At the performance test, coal includes around 7% of impurities such as stone, and the impurities should be excluded continuously at the time of actual run. Therefore, the boiler efficiency had to be changed from 89.5% to 85.8%. Further, power generation facilities have not yet been finished, and the overall operation of boiler turbine has not been executed. At the Zibo area, a 30t/h external circulating fluidized bed boiler was installed. The boiler efficiency reached 86.1%, over the targeted value. At the Batangas area in the Philippines, a 10t/h internal circulating fluidized bed boiler was installed. The boiler efficiency reached 85.8%, over the designed value. About the coal produced in the Philippines, slagging was feared, but the combustion state was favorable. 82 figs., 21 tabs.

  8. Development of coal resources

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    It is an important issue to expand stable coal supply areas for Japan, especially to assure stable supply of overseas coals. The investigations on geological structures in foreign countries perform surveys on geological structures in overseas coal producing countries and basic feasibility studies. The investigations select areas with greater business risks in coal producing countries and among private business entities. The geological structure investigations were carried out on China, Indonesia and Malaysia and the basic feasibility studies on Indonesia during fiscal 1994. The basic coal resource development investigations refer to the results of previous physical explorations and drilling tests to develop practical exploration technologies for coal resources in foreign countries. The development feasibility studies on overseas coals conduct technological consultation, surface surveys, physical explorations, and trial drilling operations, and provide fund assistance to activities related thereto. Fiscal 1994 has provided fund assistance to two projects in Indonesia and America. Fund loans are provided on investigations for development and import of overseas coals and other related activities. Liability guarantee for development fund is also described.

  9. Coal-92

    International Nuclear Information System (INIS)

    Hillring, B.; Sparre, C.

    1992-11-01

    Swedish consumption of coal and coke during 1991 and trends in technology, environment and market aspects of coal use are reported. Steam coal use in the heating sector was unchanged from 1991, 1.2 Mtons. Reduced consumption in smaller district heating units (due to conversion to biofuels and gas) was compensated by increased use for power generation in cogeneration plants. Coal consumption in industry fell 0.10 Mton to 0.84 Mton due to lower production in one industry branch. Import of steam coal was 1.1 Mton (down 0.5 Mton from 1990) since new rules for strategic reserves allowed a reduction of stocks. During the last five years stocks have been reduced by 2 Mtons. Import of metallurgical coal was 1.6 Mton, unchanged from 1990. The report also gives statistics for the coal using plants in Sweden, on coal R and D, and on emission laws for coal firing. (9 tabs., 2 figs.)

  10. Coal conversion. 1977 technical report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    The status and progress in US DOE's projects in coal gasification, liquefaction, and fluidized-bed combustion are reviewed with financing, flowsheets, history, progress and status of each (57 projects). (LTN)

  11. Fiscal 2000 feasibility research on environmentally friendly coal utilization system. Seminar holding project (China: Zaozhuang, Yanshan, Jianshan, Jinzhou); 2000 nendo kankyo chowagata sekitan riyo system kanosei chosa hokokusho. Seminar kaisai jigyo (Chugoku Zhaozhuang, Yanshan, Jianshan, Jinzhou)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Seminars were held in China for the delivery of reports on the results of model projects with a view to popularizing the results of the clean coal technology model projects, which had been completed, for the purpose of contributing to the improvement on coal utilization technology and to the enhancement of environmental protection. The seminars took place at the sites of demonstration model projects just completed in China, namely, Zhejiang Huba Corporation (low-grade coal combustion system); Chaili Colliery, Zaozhuang Coal Mining Administration (CFBC - circulating fluidized bed combustion); Jinzhou Heat Power General Co., Ltd. (CFBC); and Beijing Yanshan Petrochemical Corporation (desulfurizing agent-added coal-water mixture system). At each of the project implementation sites, lectures were given on technical matters, technical know-how was exchanged, and study tours were organized to facilities concerned, which meant to promote the diffusion of the related technologies throughout China and, eventually, to contribute to the enhancement of environmental protection. The main subjects at the seminars included the introduction of GAP (green aid plan) projects in China, introduction of the outlines of technologies related to the model projects, verification and achievements, latest trends, and measures for the diffusion of the technologies. Study tours were made, and videos were shown relating to the local conditions. Every one of the seminars was successfully attended by 60-70 participants. (NEDO)

  12. The new deal of coal

    International Nuclear Information System (INIS)

    Kalaydjian, F.; Cornot-Gandolphe, S.

    2008-01-01

    While coal appears as an inescapable resource to answer the energy needs of the 21. century, its highly CO 2 emitting combustion represents a major risk with respect to the requirements of the fight against climate change. In the first part of this book, the basic aspects of energy markets are explained and in particular the role that coal is going to play in the world's energy supplies. In the second part, the new coal usages are presented, which, combined with CO 2 capture and sequestration techniques, should allow to conciliate a massive use of coal and the respect of environmental constraints. This book is based on the works presented in February 2008 by the French institute of petroleum (IFP) about the new outlets of coal and the risks for climate change. Content: 1 - coal, energy of the 21. century: abundant and well distributed reserves; growing up world production; exponential world demand; international trade: still limited but in full expansion; 2 - Technologies for a CO 2 -free coal: CO 2 capture and sequestration technologies; towards poly-generation; production of coal-derived liquid fuels; 3 - Appendices: coals formation; coal in China: status and perspectives; coal in the USA: status and perspectives; coal in India: status and perspectives; COACH: an ambitious European project; CBM - E-CBM, status and perspectives. (J.S.)

  13. Industrial use of coal and clean coal technology

    Energy Technology Data Exchange (ETDEWEB)

    Leibson, I; Plante, J J.M.

    1990-06-01

    This report builds upon two reports published in 1988, namely {ital The use of Coal in the Industrial, Commercial, Residential and Transportation Sectors} and {ital Innovative Clean Coal Technology Deployment}, and provides more specific recommendations pertaining to coal use in the US industrial sector. The first chapter addresses industrial boilers which are common to many industrial users. The subsequent nine chapters cover the following: coke, iron and steel industries; aluminium and other metals; glass, brick, ceramic, and gypsum industries; cement and lime industries; pulp and paper industry; food and kindred products; durable goods industry; textile industry; refining and chemical industry. In addition, appendices supporting the contents of the study are provided. Each chapter covers the following topics as applicable: energy overview of the industry sector being discussed; basic processes; foreign experience; impediments to coal use; incentives that could make coal a fuel of choice; current and projected use of clean coal technology; identification of coal technology needs; conclusions; recommendations.

  14. Final Scientific/Technical Report for project “Geomechanical Monitoring for CO2 Hub Storage: Production and Injection at Kevin Dome

    Energy Technology Data Exchange (ETDEWEB)

    Daley, Thomas M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Vasco, Don [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ajo-Franklin, Jonathan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dobeck, Laura [Montana State Univ., Bozeman, MT (United States); Spangler, Lee [Montana State Univ., Bozeman, MT (United States); Leonti, Michelle [Montana State Univ., Bozeman, MT (United States)

    2017-06-27

    After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storage (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.

  15. FY 2000 report on the survey of geological structures overseas, etc. Volume 1. 'Tanjung Enim IV Coal Exploration Project between Japan and Indonesia'; 2000 nendo kaigai chishitsu kozo nado chosa hokokusho. 1. Nippon Indonesia sekitan kyodo tansa Tanjung Enim project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper summarized the results of the surveys in the final fiscal year (FY 2000) and in the past five years of the Tanjung Enim IV Coal Exploration Project between Japan and Indonesia. In FY 2000, conducted in the South Arahan area were the surface reconnaissance (50km+ACI-2), boring survey (11 holes, 1,847m), borehole physical logging (11 holes), reflection method seismic survey (3 traverse lines), pumping test, coal analysis (112 specimens), etc. As a result of the exploration/study made during 5 years, coal reserves in the South Arahan area were 223 million tons in north block (proved coal reserves: 213 million tons) and 332 million tons (proved coal reserves: 303 million tons) in south block. The coal in the area is in the depth of {+-}0m from surface, and the coal reserve is enough for large scale open pit mining. Further, coal reserves in the Banjarsari area were 442 million tons (proved coal reserves: 330 million tons) in the whole area and 223 million tons (proved coal reserves: 214 million tons) in the syncline part. About the syncline part promising as that for open pit mining, the overburden ratio was divided into three for calculation: 2:1, 3:1 and 4:1 or below. (NEDO)

  16. Projections of air toxic emissions from coal-fired utility combustion: Input for hazardous air pollutant regulators

    International Nuclear Information System (INIS)

    Szpunar, C.B.

    1993-01-01

    The US Environmental Protection Agency (EPA) is required by the 1990 CAAA to promulgate rules for all ''major'' sources of any of these HAPs. According to the HAPs section of the new Title III, any stationary source emitting 10 tons per year (TPY) of one HAP or 25 TPY of a combination of HAPs will be considered and designated a major source. In contrast to the original National Emission Standards for Hazardous Air Pollutants (NESHAP), which were designed to protect public health to ''an ample margin of safety,'' the new Title III, in its first phase, will regulate by industrial category those sources emitting HAPs in excess of the 10/25-TPY threshold levels, regardless of health risks. The trace elements normally associated with coal mineral matter and the various compounds formed during coal combustion have the potential to produce hazardous air toxic emissions from coal-fired electric utilities. Under Title III, the EPA is required to perform certain studies, prior to any regulation of electric utilities; these studies are currently underway. Also, the US Department of Energy (DOE) maintains a vested interest in addressing those energy policy questions affecting electric utility generation, coal mining, and steel producing critical to this country's economic well-being, where balancing the costs to the producers and users of energy with the benefits of environmental protection to the workers and the general populace remains of significant concern

  17. Experimental Plan: Uranium Stabilization Through Polyphosphate Injection 300 Area Uranium Plume Treatability Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Wellman, Dawn M.; Fruchter, Jonathan S.; Vermeul, Vince R.

    2006-09-20

    This Test Plan describes a laboratory-testing program to be performed at Pacific Northwest National Laboratory (PNNL) in support of the 300-FF-5 Feasibility Study (FS). The objective of the proposed treatability test is to evaluate the efficacy of using polyphosphate injections to treat uranium contaminated groundwater in situ. This study will be used to: (1) Develop implementation cost estimates; (2) Identify implementation challenges; and (3) Investigate the technology's ability to meet remedial objectives These activities will be conducted in parallel with a limited field investigation, which is currently underway to more accurately define the vertical extent of uranium in the vadose zone, and in the capillary fringe zone laterally throughout the plume. The treatability test will establish the viability of the method and, along with characterization data from the limited field investigation, will provide the means for determining how best to implement the technology in the field. By conducting the treatability work in parallel with the ongoing Limited Field Investigation, the resulting Feasibility Study (FS) will provide proven, site-specific information for evaluating polyphosphate addition and selecting a suitable remediation strategy for the uranium plume within the FS time frame at an overall cost savings.

  18. Coal 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    ACR's Coal 1992, the successor to the ACR Coal Marketing Manual, contains a comprehensive set of data on many aspects of the Australian coal industry for several years leading up to 1992. Tables and text give details of coal production and consumption in New South Wales, Queensland and other states. Statistics of the Australian export industry are complemented by those of South Africa, USA, New Zealand, Canada, Indonesia, China, Colombia, Poland and ex-USSR. Also listed are prices of Australian coking and non-coking coal, Australian coal stocks (and those of other major countries), loading port capacities, freight rates and coal quality requirements (analysis of coals by brand and supplier). A listing of Australian coal exporting companies is provided. A description of the spot Coal Screen Dealing System is given. World hard coal imports are listed by country and coal imports by major Asian countries tabulated. A forecast of demand by coal type and country up to the year 2000 is included.

  19. A MILP for multi-machine injection moulding sequencing in the scope of C2NET Project

    Directory of Open Access Journals (Sweden)

    Beatriz Andrés

    2018-01-01

    Full Text Available The goal of C2NET European H2020 Funded Project is the creation of cloud-enabled tools for supporting the SMEs supply network optimization of manufacturing and logistic assets based on collaborative demand, production and delivery plans. In the scope of C2NET Project, and particularly in the Optimisation module (C2NET OPT, this paper proposes a novel holistic mixed integer linear programing (MILP model to optimise the injection sequencing in a multi-machine case. The results of the MILP will support the production planner decision-making process in the calculation of (i moulds setup in certain machines, and (ii the amount of products to produce in order to minimise the setup, inventory, and backorders costs. The designed MILP takes part of the algorithms repository created in C2NET European Funded Project to solve realistic industry planning problems. The MILP is verified in realistic data considering three data sets with different sizes, in order to test it’s the computation efficiency.

  20. Development and start up of a co-injection system of coal tar/natural gas in blast furnace no. 4; Desarrollo y puesta en operacion de un sistema de co-inyeccion de alquitran/gas natural en el alto horno no. 4

    Energy Technology Data Exchange (ETDEWEB)

    Falcon Rodriguez, Manuel I; Mata Esparza, Hector Rolando; Arevalo Ballesteros, Gerardo [Altos Hornos de Mexico S. A., Coahuila (Mexico)

    1994-12-31

    The crisis has attracted the world`s attention on the need for energy conservation and the development in a greater extent the utilization of carbon base fuels and other energy sources (nuclear energy). Being a blast furnace, not only an energy consumer but also an energy producer, the greatest contribution to the pig iron cost is the energy needed to melt and reduce to metallic state the iron ores, this energy is mainly derived from coke. The dependence on coal via the coking plant to produce first fusion iron is incremented day after day as a result of the high levels of production. Altos Hornos de Mexico (AHMSA), contemplated within its strategic plan, the reduction in the production of its coking plants derived from the natural aging of its furnaces, consequently the shortage of coke for productions higher than 2.6 MMT of pig iron is pending. The injection of fuels into a blast furnace through its nozzles is a technology used for the diminishing the coke consumption of coke, its use implies a change in the philosophy of the blast furnace operation, and is currently employed in most of the blast furnaces of the world. AHMSA taking advantage of coal tar production (approx. 130 tons/day) in its coking plants decided the design and put into operation a co-injection system of coal tar and natural gas. The activities tending to carry out this project were initiated on April 1993, performing all of them with its own resources, completing them on July 18, 1993, day on which the injection of coal tar/natural gas in blast furnace No. 4 in a stable form. To date (October 1993), the coal tar injection has been increased up to 36 kg/ton of pig iron. During the injection periods, the presence of operational, mechanical and instrumentation problems have not been an obstacle for the evolution on the injection, fulfilling its function of substituting coke in a replacing relationship of 1:1, i.e. 1 kg of coal tar per each kg of coke, without affecting the product quality

  1. Development and start up of a co-injection system of coal tar/natural gas in blast furnace no. 4; Desarrollo y puesta en operacion de un sistema de co-inyeccion de alquitran/gas natural en el alto horno no. 4

    Energy Technology Data Exchange (ETDEWEB)

    Falcon Rodriguez, Manuel I.; Mata Esparza, Hector Rolando; Arevalo Ballesteros, Gerardo [Altos Hornos de Mexico S. A., Coahuila (Mexico)

    1993-12-31

    The crisis has attracted the world`s attention on the need for energy conservation and the development in a greater extent the utilization of carbon base fuels and other energy sources (nuclear energy). Being a blast furnace, not only an energy consumer but also an energy producer, the greatest contribution to the pig iron cost is the energy needed to melt and reduce to metallic state the iron ores, this energy is mainly derived from coke. The dependence on coal via the coking plant to produce first fusion iron is incremented day after day as a result of the high levels of production. Altos Hornos de Mexico (AHMSA), contemplated within its strategic plan, the reduction in the production of its coking plants derived from the natural aging of its furnaces, consequently the shortage of coke for productions higher than 2.6 MMT of pig iron is pending. The injection of fuels into a blast furnace through its nozzles is a technology used for the diminishing the coke consumption of coke, its use implies a change in the philosophy of the blast furnace operation, and is currently employed in most of the blast furnaces of the world. AHMSA taking advantage of coal tar production (approx. 130 tons/day) in its coking plants decided the design and put into operation a co-injection system of coal tar and natural gas. The activities tending to carry out this project were initiated on April 1993, performing all of them with its own resources, completing them on July 18, 1993, day on which the injection of coal tar/natural gas in blast furnace No. 4 in a stable form. To date (October 1993), the coal tar injection has been increased up to 36 kg/ton of pig iron. During the injection periods, the presence of operational, mechanical and instrumentation problems have not been an obstacle for the evolution on the injection, fulfilling its function of substituting coke in a replacing relationship of 1:1, i.e. 1 kg of coal tar per each kg of coke, without affecting the product quality

  2. Testing gravitational-wave searches with numerical relativity waveforms: results from the first Numerical INJection Analysis (NINJA) project

    International Nuclear Information System (INIS)

    Aylott, Benjamin; Baker, John G; Camp, Jordan; Centrella, Joan; Boggs, William D; Buonanno, Alessandra; Boyle, Michael; Buchman, Luisa T; Chu, Tony; Brady, Patrick R; Brown, Duncan A; Bruegmann, Bernd; Cadonati, Laura; Campanelli, Manuela; Faber, Joshua; Chatterji, Shourov; Christensen, Nelson; Diener, Peter; Dorband, Nils; Etienne, Zachariah B

    2009-01-01

    The Numerical INJection Analysis (NINJA) project is a collaborative effort between members of the numerical relativity and gravitational-wave data analysis communities. The purpose of NINJA is to study the sensitivity of existing gravitational-wave search algorithms using numerically generated waveforms and to foster closer collaboration between the numerical relativity and data analysis communities. We describe the results of the first NINJA analysis which focused on gravitational waveforms from binary black hole coalescence. Ten numerical relativity groups contributed numerical data which were used to generate a set of gravitational-wave signals. These signals were injected into a simulated data set, designed to mimic the response of the initial LIGO and Virgo gravitational-wave detectors. Nine groups analysed this data using search and parameter-estimation pipelines. Matched filter algorithms, un-modelled-burst searches and Bayesian parameter estimation and model-selection algorithms were applied to the data. We report the efficiency of these search methods in detecting the numerical waveforms and measuring their parameters. We describe preliminary comparisons between the different search methods and suggest improvements for future NINJA analyses.

  3. A proposal of a beam injection device for the proton storage ring of JAERI neutron science project

    International Nuclear Information System (INIS)

    Suzuki, Yasuo

    1998-01-01

    A new injection device (a charge-exchange device) with light and magnetic field, is proposed for a proton storage ring of JAERI Neutron Science Project. This injection device is composed of a neutralizer and an ionizer. The neutralizer strips electrons of H 0 beam into H - one with the undulator magnetic field. The ionizer which is composed of undulator magnets and an optical resonator placed along a straight part in the storage ring, can ionize effectively the H 0 beam excited to n=3 level by a laser beam into H + one. Adopting the 2nd harmonics of Nd : YAG laser, the powerful laser on the market can be used, and the required items of the technological development can be minimized. The energy of the particle beam, however, should be accelerated up to 1.587 GeV by 6% increase from 1.5 GeV. In this device, the non-charge-exchange rate and beam-spill can be minimized by decreasing the deflection angle of the beam which occurs at the charge-exchange process. This method can be realized with exiting technologies and there are not any effects on the trajectory of the ring-circulating proton beam due to scatterings by the foil as the usual charge-exchange devices. This device, therefore, will be an optimal and highly effective method of the least beam-spill as the injector of the high power proton storage ring. (author)

  4. Pharmacological Interventions Including Medical Injections for Neck Pain: An Overview as Part of the ICON§ Project

    Science.gov (United States)

    Peloso, Paul M; Khan, Mahweesh; Gross, Anita R; Carlesso, Lisa; Santaguida, Lina; Lowcock, Janet; MacDermid, Joy C; Walton, Dave; Goldsmith, Charlie H; Langevin, Pierre; Shi, Qiyun

    2013-01-01

    Objectives: To conduct an overview (review-of-reviews) on pharmacological interventions for neck pain. Search Strategy: Computerized databases and grey literature were searched from 2006 to 2012. Selection Criteria: Systematic reviews of randomized controlled trials (RCT) in adults with acute to chronic neck pain reporting effects of pharmacological interventions including injections on pain, function/disability, global perceived effect, quality of life and patient satisfaction. Data Collection & Analysis: Two independent authors selected articles, assessed risk of bias and extracted data The GRADE tool was used to evaluate the body of evidence and an external panel provided critical review. Main Results: We found 26 reviews reporting on 47 RCTs. Most pharmacological interventions had low to very low quality methodologic evidence with three exceptions. For chronic neck pain, there was evidence of: a small immediate benefit for eperison hydrochloride (moderate GRADE, 1 trial, 157 participants);no short-term pain relieving benefit for botulinum toxin-A compared to saline (strong GRADE; 5 trial meta-analysis, 258 participants) nor for subacute/chronic whiplash (moderate GRADE; 4 trial meta-analysis, 183 participants) including reduced pain, disability or global perceived effect; andno long-term benefit for medial branch block of facet joints with steroids (moderate GRADE; 1 trial, 120 participants) over placebo to reduce pain or disability; Reviewers' Conclusions: While in general there is a lack of evidence for most pharmacological interventions, current evidence is against botulinum toxin-A for chronic neck pain or subacute/chronic whiplash; against medial branch block with steroids for chronic facet joint pain; but in favour of the muscle relaxant eperison hydrochloride for chronic neck pain. PMID:24155805

  5. Coal pump

    Science.gov (United States)

    Bonin, John H.; Meyer, John W.; Daniel, Jr., Arnold D.

    1983-01-01

    A device for pressurizing pulverized coal and circulating a carrier gas is disclosed. This device has utility in a coal gasification process and eliminates the need for a separate collection hopper and eliminates the separate compressor.

  6. Specifications of the Field Quality at Injection Energy of the New Magnets for the HL-LHC Upgrade Project

    CERN Document Server

    De Maria, R; Giovannozzi, M

    2013-01-01

    The HL-LHC project relies on new magnet designs and technologies to achieve very small beta* values. In particular, Nb$_{3}$Sn magnets show large allowed multipole imperfections at low current. These field imperfections may have a non-negligible impact on the dynamic aperture and beam life time in the HL-LHC, also because of the smaller-than- nominal beta* values foreseen IR1 and IR5 at injection energy, which aims at decreasing the dynamic range of the squeeze and therefore contributing to optimize the turn around time. The paper describes an analysis of the machine performance based on analytical estimates and tracking simulations with the goal of providing field quality specifications for the new magnets.

  7. Twisted injectivity in projected entangled pair states and the classification of quantum phases

    Energy Technology Data Exchange (ETDEWEB)

    Buerschaper, Oliver, E-mail: obuerschaper@perimeterinstitute.ca

    2014-12-15

    We introduce a class of projected entangled pair states (PEPS) which is based on a group symmetry twisted by a 3-cocycle of the group. This twisted symmetry is expressed as a matrix product operator (MPO) with bond dimension greater than 1 and acts on the virtual boundary of a PEPS tensor. We show that it gives rise to a new standard form for PEPS from which we construct a family of local Hamiltonians which are gapped, frustration-free and include fixed points of the renormalization group flow. Based on this insight, we advance the classification of 2D gapped quantum spin systems by showing how this new standard form for PEPS determines the emergent topological order of these local Hamiltonians. Specifically, we identify their universality class as DIJKGRAAF–WITTEN topological quantum field theory (TQFT). - Highlights: • We introduce a new standard form for projected entangled pair states via a twisted group symmetry which is given by nontrivial matrix product operators. • We construct a large family of gapped, frustration-free Hamiltonians in two dimensions from this new standard form. • We rigorously show how this new standard form for low energy states determines the emergent topological order.

  8. Status of the S.E. Geysers effluent pipeline & injection project

    Energy Technology Data Exchange (ETDEWEB)

    Dellinger, M. [Lake County Sanitation District, Lakeport, CA (United States)

    1997-12-31

    A unique public/private partnership of local, state, federal, and corporate stakeholders is constructing the world`s first wastewater-to-electricity system in Lake County, California. A rare example of a genuinely {open_quotes}sustainable{close_quotes} system, three Lake County communities will recycle their treated wastewater effluent through the Geysers geothermal steamfield to produce an estimated 625,000 MWh of electricity annually from six existing geothermal power plants. The concept is shown schematically. Construction was initiated in October 1995, and as of this writing, the system is approximately 85% complete. Operational start-up is expected in October 1997. The key to the project`s success thus far has been its emphasis on cooperative action among affected stakeholders; and a broad, community-based view of solving problems rather than the traditional, narrower view of engineering-driven technical solutions. Special attention has been given to environmentally-responsive engineering design to avoid or minimize adverse environmental impacts.

  9. Report on investigations in fiscal 2000 on the basic investigation on promotion of joint implementation. Project to utilize coal bed methane gas for power generation in Poland; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Poland tanko methane gas hatsuden riyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Having the Mining Industry Restructuring Public Corporation located in the city of Katowice, Poland as the counterpart, a feasibility study has been executed on a project to utilize coal bed gas for power generation. Selected for the study are the 'Budryk coal mine' owned by KWK 'Budryk' Coal Company and the 'Pniowek coal mine' owned by Jastrzebie Coal Company. Since the Pniowek coal mine can utilize the whole quantity of recovered methane by 2001, the Budryk coal mine was selected as the object of the project. As a result of the trial calculation on the economy when the new gas power plant is installed in the Budryk coal mine, the energy substitution effect was found to equal to a power amount at transmission terminal of 6 MWh/year. Furthermore, when proliferation effect is taken into consideration, an enormous effect can be expected if new coal mines are developed and the existing cola mines will go further deeper, because the Silesian coal mine presently has the coal resource quantity of 57 billion tons and the annual gas discharge quantity of 750 million m{sup 3}. Therefore, if the technologies to recover, manage and utilize the gas are established at the Budryk coal mine, a large effect leading to an aspiration would be expected under the current situation of the structural reorganization under which the Polish coal companies are placed. (NEDO)

  10. Reduction of SO{sub 2} Emissions in Coal Power Plants by means of Spray-Drying RESOX Research Project; Acondicionamiento de Gases de Combustion para la Reduccion de Emisiones de Particulas en Centrales Termicas de Carbon

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    In this experimental study, two important matters concerning the spray-drying technology for the desulphurisation of combustion gases, from pulverized coal boilers, have been analyzed: (1) the behaviour of the spray-dryer absorber under different operating conditions and (2) the behaviour of an electrostatic precipitator that operates downstream form a spray-dryer. The results of this project are of great interest for evaluating the application of this semi-dry desulphurisation technology in existing power plants that already have electrostatic precipitators. Additionally, the conclusions drawn are useful for establishing the optimum design and operating conditions for an integrated SD-ESP flue gas treatment facility. More than 45 experimental tests have been conducted on a 10,000 Nm``3/h spray-drying desulphurisation pilot plant. The effects of SO{sub 2} and fly ash concentration, Ca/S ratio, approach to saturation temperature, density of the slurry and unit load changes on both spray dryer behaviour and treated flue gas properties have been analyzed. In two additional specific tests, the effect of injecting calcium chloride and of preparing the slurry with seawater has also been studied. The impact of spray-dryer desulphurization on the behaviour of the electrostatic precipitators ha been evaluated comparing experimental data (efficiency, emission level, electrical consumption) for the behaviour of the electrostatic precipitator, obtained in two different experimental conditions: with and without desulphurization. Additionally, the possibility of reducing the power consumption of the precipitator by means of intermittent energization has been analyzed. (Author)

  11. NONEQUILIBRIUM SULFUR CAPTURE & RETENTION IN AN AIR COOLED SLAGGING COAL COMBUSTOR

    Energy Technology Data Exchange (ETDEWEB)

    Bert Zauderer

    2003-04-21

    Calcium oxide injected in a slagging combustor reacts with the sulfur from coal combustion to form sulfur-bearing particles. The reacted particles impact and melt in the liquid slag layer on the combustor wall by the centrifugal force of the swirling combustion gases. Due to the low solubility of sulfur in slag, it must be rapidly drained from the combustor to limit sulfur gas re-evolution. Prior analyses and laboratory scale data indicated that for Coal Tech's 20 MMBtu/hour, air-cooled, slagging coal combustor slag mass flow rates in excess of 400 lb/hr should limit sulfur re-evolution. The objective of this 42-month project was to validate this sulfur-in-slag model in a group of combustor tests. A total of 36 days of testing on the combustor were completed during the period of performance of this project. This was more that double the 16 test days that were required in the original work statement. The extra tests were made possible by cost saving innovations that were made in the operation of the combustor test facility and in additional investment of Coal Tech resources in the test effort. The original project plan called for two groups of tests. The first group of tests involved the injection of calcium sulfate particles in the form of gypsum or plaster of Paris with the coal into the 20 MMBtu/hour-combustor. The second group of tests consisted of the entire two-step process, in which lime or limestone is co-injected with coal and reacts with the sulfur gas released during combustion to form calcium sulfate particles that impact and dissolve in the slag layer. Since this sulfur capture process has been validated in numerous prior tests in this combustor, the primary effort in the present project was on achieving the high slag flow rates needed to retain the sulfur in the slag.

  12. A study of toxic emissions from a coal-fired power plant utilizing an ESP while demonstrating the ICCT CT-121 FGD Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-16

    The US Department of Energy is performing comprehensive assessments of toxic emissions from eight selected coal-fired electric utility units. This program responds to the Clean Air Act Amendments of 1990, which require the US Environmental Protection Agency (EPA) to evaluate emissions of hazardous air pollutants (HAPs) from electric utility power plants for Potential health risks. The resulting data will be furnished to EPA utility power plants and health risk determinations. The assessment of emissions involves the collection and analysis of samples from the major input, process, and output streams of each of the eight power plants for selected hazardous Pollutants identified in Title III of the Clean Air Act. Additional goals are to determine the removal efficiencies of pollution control subsystems for these selected pollutants and the Concentrations associated with the particulate fraction of the flue gas stream as a function of particle size. Material balances are being performed for selected pollutants around the entire power plant and several subsystems to identify the fate of hazardous substances in each utility system. Radian Corporation was selected to perform a toxics assessment at a plant demonstrating an Innovative Clean Coal Technology (ICCT) Project. The site selected is Plant Yates Unit No. 1 of Georgia Power Company, which includes a Chiyoda Thoroughbred-121 demonstration project.

  13. National Coal Quality Inventory (NACQI)

    Energy Technology Data Exchange (ETDEWEB)

    Robert Finkelman

    2005-09-30

    The U.S. Geological Survey (USGS) conducted the National Coal Quality Inventory (NaCQI) between 1999 and 2005 to address a need for quality information on coals that will be mined during the next 20-30 years. Collaboration between the USGS, State geological surveys, universities, coal burning utilities, and the coal mining industry plus funding support from the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) permitted collection and submittal of coal samples for analysis. The chemical data (proximate and ultimate analyses; major, minor and trace element concentrations) for 729 samples of raw or prepared coal, coal associated shale, and coal combustion products (fly ash, hopper ash, bottom ash and gypsum) from nine coal producing States are included. In addition, the project identified a new coal reference analytical standard, to be designated CWE-1 (West Elk Mine, Gunnison County, Colorado) that is a high-volatile-B or high-volatile-A bituminous coal with low contents of ash yield and sulfur, and very low, but detectable contents of chlorine, mercury and other trace elements.

  14. Fiscal 1998 research report. Improvement project of low-grade coals in Chongqing City, China for CO{sub 2} reduction (Feasibility study on the production business of coal- biomass briquette); 1998 nendo chosa hokokusho. CO{sub 2} sakugen no tame no Chuka Jinmin Kyowakoku Jukei chokkatsushi no teihin'i sekitanshitsu no kaizen project (Bio briquette seizo jigyo no chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the effect of introduction of production technology of coal-biomass briquette (Japanese coal improvement technology) in Chongqing City on reduction of greenhouse effect gases and acid rain causative substances, and sustainable economic growth. The study result on the feasibility of this project and reduction of greenhouse effect gases was summarized. In this feasibility study, Japan-China joint field survey, and both proximate and ultimate analyses of obtained raw materials were carried out. Based on the experimental result in the pilot briquette plant in Chongqing City, study was made on the necessary of the 1 Mtons/y class pilot plant in the pilot area including Nantong coal mine in Chongqing City, and the location, investment, production cost and distribution means of the plant. Based on the evaluation result on CO{sub 2} reduction effect, economical efficiency, environment effect and social effect, its urgency and effectiveness as international cooperation project by yen credit were also confirmed. It is extremely important to promote localization of the plant in the future. (NEDO)

  15. Fiscal 1998 research report. Improvement project of low-grade coals in Chongqing City, China for CO{sub 2} reduction (Feasibility study on the production business of coal- biomass briquette); 1998 nendo chosa hokokusho. CO{sub 2} sakugen no tame no Chuka Jinmin Kyowakoku Jukei chokkatsushi no teihin'i sekitanshitsu no kaizen project (Bio briquette seizo jigyo no chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the effect of introduction of production technology of coal-biomass briquette (Japanese coal improvement technology) in Chongqing City on reduction of greenhouse effect gases and acid rain causative substances, and sustainable economic growth. The study result on the feasibility of this project and reduction of greenhouse effect gases was summarized. In this feasibility study, Japan-China joint field survey, and both proximate and ultimate analyses of obtained raw materials were carried out. Based on the experimental result in the pilot briquette plant in Chongqing City, study was made on the necessary of the 1 Mtons/y class pilot plant in the pilot area including Nantong coal mine in Chongqing City, and the location, investment, production cost and distribution means of the plant. Based on the evaluation result on CO{sub 2} reduction effect, economical efficiency, environment effect and social effect, its urgency and effectiveness as international cooperation project by yen credit were also confirmed. It is extremely important to promote localization of the plant in the future. (NEDO)

  16. ICPP injection well alternative project, Idaho National Engineering Laboratory. Final report

    International Nuclear Information System (INIS)

    1980-10-01

    The Idaho Chemical Processing Plant (ICPP) portion of the Idaho National Engineering Laboratory (INEL) has been obtaining water needed for its operations from the Snake River aquifer, which occupies the entire region underlying the site. Most of this water has been used for cooling operating equipment, while a small portion has found various process uses. After passing through the ICPP process area, these waters are then returned to the aquifer. A small portion (about 1%) of the returned stream contains measurable amounts of radioactivity derived from the miscellaneous process users. This report and the recommendations contained herein are based upon stream flows projected for 1985 as supplied by DOE for the ICPP. 26 different alternatives for handling cooling water, chemical, and low level radioactive water disposal are examined. These cases are considered from technical, environmental, safety, and economic points of view. The level of detail is sufficient to eliminate non-viable cases, and to identify those which offer improvements over present practice. The Environmental/Safety Risk Factors were evaluated on a qualitative comparison basis only. Before a recommended improvement is incorporated into the waste disposal system, a conceptual design study should be made which would evaluate all those secondary effects and environmental factors that, by the very nature of the screening process, this study has not provided. Certain synergistic combinations have been noted and are discussed. This report does note whether the operations considered are in regulatory compliance, or are likely to be capable of providing lasting improvement to the waste water system. Qualitative comparisons were made between the various alternatives to confirm their relationship with applicable standards

  17. Fiscal 1998 engineer interexchange project (coal mine technology field). Preliminary survey on the international interexchange project in America; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Beikoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the fiscal 1998 international interexchange project in a coal mine technology field, the survey was made in America. Geological engineering problem has large effect on the protection and productivity of underground coal mines. Promotion of long wall mining has contributed to reduction of disasters, however, recently deaths due to roof collapse and wall collapse are on the increase. A roof evaluation technique was developed for adequate selection of mining methods and support design, and its standardization and diffusion are in promotion. Integration and improvement advanced in facility technology because of worldwide integration by acquisition of coal mine facility manufacturers. Introduction of high-power high-capacity facilities is increasing with introduction of large long wall working faces, and development of rear transport system technology and labor saving by remote control are also in promotion according to such trend. As automation and labor saving technology of mining facilities, the automated direction detection and control system by laser and gyroscope is under development. (NEDO)

  18. Demonstration of advanced combustion NO(sub X) control techniques for a wall-fired boiler. Project performance summary, Clean Coal Technology Demonstration Program

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The project represents a landmark assessment of the potential of low-NO(sub x) burners, advanced overtire air, and neural-network control systems to reduce NO(sub x) emissions within the bounds of acceptable dry-bottom, wall-fired boiler performance. Such boilers were targeted under the Clean Air Act Amendments of 1990 (CAAA). Testing provided valuable input to the Environmental Protection Agency ruling issued in March 1994, which set NO(sub x) emission limits for ''Group 1'' wall-fired boilers at 0.5 lb/10(sup 6) Btu to be met by January 1996. The resultant comprehensive database served to assist utilities in effectively implementing CAAA compliance. The project is part of the U.S. Department of Energy's Clean Coal Technology Demonstration Program established to address energy and environmental concerns related to coal use. Five nationally competed solicitations sought cost-shared partnerships with industry to accelerate commercialization of the most advanced coal-based power generation and pollution control technologies. The Program, valued at over$5 billion, has leveraged federal funding twofold through the resultant partnerships encompassing utilities, technology developers, state governments, and research organizations. This project was one of 16 selected in May 1988 from 55 proposals submitted in response to the Program's second solicitation. Southern Company Services, Inc. (SCS) conducted a comprehensive evaluation of the effects of Foster Wheeler Energy Corporation's (FWEC) advanced overfire air (AOFA), low-NO(sub x) burners (LNB), and LNB/AOFA on wall-fired boiler NO(sub x) emissions and other combustion parameters. SCS also evaluated the effectiveness of an advanced on-line optimization system, the Generic NO(sub x) Control Intelligent System (GNOCIS). Over a six-year period, SCS carried out testing at Georgia Power Company's 500-MWe Plant Hammond Unit 4 in Coosa, Georgia. Tests proceeded in a logical sequence using rigorous statistical analyses to

  19. A Comprehensive Overview of CO2 Flow Behaviour in Deep Coal Seams

    Directory of Open Access Journals (Sweden)

    Mandadige Samintha Anne Perera

    2018-04-01

    Full Text Available Although enhanced coal bed methane recovery (ECBM and CO2 sequestration are effective approaches for achieving lower and safer CO2 levels in the atmosphere, the effectiveness of CO2 storage is greatly influenced by the flow ability of the injected CO2 through the coal seam. A precious understanding of CO2 flow behaviour is necessary due to various complexities generated in coal seams upon CO2 injection. This paper aims to provide a comprehensive overview on the CO2 flow behaviour in deep coal seams, specifically addressing the permeability alterations associated with different in situ conditions. The low permeability nature of natural coal seams has a significant impact on the CO2 sequestration process. One of the major causative factors for this low permeability nature is the high effective stresses applying on them, which reduces the pore space available for fluid movement with giving negative impact on the flow capability. Further, deep coal seams are often water saturated where, the moisture behave as barriers for fluid movement and thus reduce the seam permeability. Although the high temperatures existing at deep seams cause thermal expansion in the coal matrix, reducing their permeability, extremely high temperatures may create thermal cracks, resulting permeability enhancements. Deep coal seams preferable for CO2 sequestration generally are high-rank coal, as they have been subjected to greater pressure and temperature variations over a long period of time, which confirm the low permeability nature of such seams. The resulting extremely low CO2 permeability nature creates serious issues in large-scale CO2 sequestration/ECBM projects, as critically high injection pressures are required to achieve sufficient CO2 injection into the coal seam. The situation becomes worse when CO2 is injected into such coal seams, because CO2 movement in the coal seam creates a significant influence on the natural permeability of the seams through CO2

  20. 15 years of Spanish participation in the international projects of R and D coal technology coordinated by OCICARBON; 15 Anos de Participacion Espanola en los foros Internacionales de I+D Tecnologico del Carbon coordinados por OCICARBON

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    As fulfillment of strategy objectives, OCICARBON ( the Spanish Management Association for Coal Research and Development Projects) has maintained a strong link with European and International entities, devoted to coal research and development activities. As consequence of these collaborations, it has been reached uncountable economical and technological benefits, from the projects carried out by Spanish industries and technological entities, under the European Programmes umbrella. In this summary report, it is informed about how the co-ordination of national and international entities, was organised and structured; and the national results, obtained as consequence of the activities carried out by OCICARBON. (Author)

  1. Buckets of money for coal

    International Nuclear Information System (INIS)

    Anon

    2001-01-01

    The revival of coal prices is providing record profits for Australian coal producers. As the world's largest coal exporter, any move in coal prices has significant ramifications for the Australian economy. The coal boom of the mid-1980s resulted in a massive increase in mine capacity and subsequently excess supply. This resulted in the decade between 1990 and 2000 seeing benchmark prices for coking coal in Japan plummeting to $US 39 a tonne (down from around the $US 52 mark) and a price of $US 28 for a tonne of steaming coal. Asia's financial problems, late in the decade coupled with a rapid fall in Asian steel making, also added to our coal export woes. As a result for most of the 1990s, Australia's coal sector delivered inadequate returns, was seen as over-capitalised and suffered from a profound investor indifference. But the sector is now seeing a definite turnaround in fortunes. Prices for thermal coal are on the rise and the benchmark coking coal prices to Asia have also jumped. Market analysts reported the price for contract deliveries of thermal coal in April this year were $US 34.50 ($AUD 69.35) up by $US 5.75 from the same time last year. The increased production is expected on the back of a continued rise in export demand, further improvement in prices, significant improvements in mine productivity, a weak Australian dollar and the probability of new projects and mine extensions going into operation. The improved returns have also flowed into rising valuations for listed coal miners. Over the last year, coal miners such as MIM and Gympie Gold, have delighted in share price gains of 12 per cent and 55 per cent respectively. These sort of performances are being repeated across the Australian industry

  2. Characterizing toxic emissions from a coal-fired power plant demonstrating the AFGD ICCT Project and a plant utilizing a dry scrubber/baghouse system: Bailly Station Units 7 and 8 and AFGD ICCT Project. Final report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Dismukes, E.B.

    1994-10-20

    This report describes results of assessment of the risk of emissions of hazardous air pollutants at one of the electric power stations, Bailly Station, which is also the site of a Clean Coal Technology project demonstrating the Pure Air Advanced Flue Gas Desulfurization process (wet limestone). This station represents the configuration of no NO{sub x} reduction, particulate control with electrostatic precipitators, and SO{sub 2} control with a wet scrubber. The test was conducted September 3--6, 1993. Sixteen trace metals were determined along with 5 major metals. Other inorganic substances and organic compounds were also determined.

  3. FY 1980 Report on results of Sunshine Project by Coal Group. Basic researches on coal liquefaction techniques by solvolysis; 1980 nendo sunshine keikaku sekitanhan hokokusho. Sekitan no solvolysis ekika gijutsu no kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    The basic experimental researches were carried out for coal liquefaction by solvolysis. The studied items include hydrogenation conditions for treating the primary liquefied products, asphalt, pitch and model solvents (e.g., anthracene oil) in the presence of a commercial catalyst, solvolysis conditions for finely divided, molten coal using a hydrogenation recycled solvent, hydrotreating solvents, analysis of solvolysis-liquefied products, and liquefaction capacity of fractionated solvents for finely divided, molten coal. The studied items for separation of minerals include settlement at high temperature of the solid residue from the first liquefaction stage, and changed coal particle size distribution as a result of the first-stage liquefaction reactions in the presence of a hydrogenation solvent. The experimental study results indicate that conversion of finely divided molten coal into asphaltenes and preasphaltenes is notably accelerated in the phase-II coal liquefaction process by solvolysis, when a hydrotreating solvent is used for the first stage solvolysis process. (NEDO)

  4. U.S. coal outlook in Asia

    International Nuclear Information System (INIS)

    Johnson, C.J.

    1997-02-01

    Coal exports from the US to Asia are declining over time as a result of (1) increased competition from coal suppliers within the Asia-Pacific region, (2) changing steel making technologies, (3) decreased emphasis on security of coal supplies, and (4) deregulation of the energy industry--particularly electric utilities. There are no major changes on the horizon that are likely to alter the role of the US as a modest coal supplier to the Asia-Pacific region. The downward trend in US coal exports to Asia is expected to continue over the 1997--2010 period. But economic and policy changes underway in Asia are likely to result in periodic coal shortages, lasting a few months to a year, and short term increased export opportunities for US coal. US coal exports to Asia are projected to fluctuate within the following ranges over the 2000--2010 period: 10--17 million tons in total exports, 6--12 million tons in thermal coal exports, and 4--9 million tons in coking coal exports. The most important role for US coal, from the perspective of Asian coal importing countries, is to ensure a major alternative source of coal supplies that can be turned to in the event of unforeseen disruptions in coal supplies from the Asia-Pacific region or South Africa. However, the willingness of consumers to pay a premium to ensure US export capacity is declining, with increased emphasis on obtaining the lowest cost coal supplies

  5. Report on the achievements in the Sunshine Project in fiscal 1988. Development of a coal liquefaction technology (Liquefaction performance test on Chinese coals); 1988 nendo sekitan ekika gijutsu kaihatsu, Chugokutan ekika seino shiken seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-03-01

    Development has been carried out on a Chinese coal liquefaction technology jointly by Japan and China. The Japanese side fabricated and built a small continuous testing equipment. Shenbei coal produced in Liaoning Province, Tienju coal produced in Gansu Province and Shenmu coal produced in Shaanxi Province were used as test sample coals. These coals were crushed, washed with water, sorted, dried, pulverized below 100 mesh, and used as the test samples. For catalysts, a reagent Fe{sub 2}O{sub 3} and S as an auxiliary catalyst made in China were used. Anthracene oil freed from crystal was used as a starting solvent when making one-through operation and recycling operation. Hydrogen used had purity of 99.5% or higher. The current fiscal year has performed smoothly to the end either of the one-through operation or the solvent circulating operation on RUN-2200, 2300 (Chenbei coal) and 2,400, 2500 (Tienju coal). Operation of 2600, 2700 (Shenmu coal) experienced noise in the stirrer of the reactor, and leakage of the circulating gas from the recycled gas compressor. In addition, the differential pressure during operating the last run has increased to 50 k, when the temperature and pressure were reduced, and substances clogging the reactor inlet line were removed. Three kinds of the liquefied oils were brought back to Japan for detailed analyses. (NEDO)

  6. Coal 95; Kol - 95

    Energy Technology Data Exchange (ETDEWEB)

    Sparre, C

    1996-12-31

    The report deals with the use of coal and coke in Sweden during 1994. Some information about technology, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from Statistics Sweden have also been used.The use of steam coal for heating purposes has been unchanged during 1994 at a level of 1 Mtons. The production in the cogeneration plants has been constant, but has increased for electricity production. The minor plants have increased their use of forest fuels. The use of steam coal will probably go down in the next years both for heat and cogeneration plants. During the top year 1987 coal was used in 18 hot water and 11 cogeneration plants. 1994 these figures are 3 and 12. Taxes and environmental reasons explain this trend. The use of steam coal in industry has been constant at the level 0.7 Mtons. The import of metallurgical coal in 1993 was 1.6 Mtons, like 1992. Import of 0.3 Mtons of coke gives the total consumption of coke in industry as 1.5 Mtons. the average price of steam coal imported to Sweden was 317 SEK/ton, 3% higher than 1993. All Swedish plants meet their emission limit of dust, SO{sub 2} and NO{sub x} as given by county administrations or concession boards. The cogeneration plants all have some SO{sub 2} removal system. The biggest cogeneration plant (Vaesteraas) has recently invested in a SCR NO{sub x} cleaning system. Most other plants use low NO{sub x} burners or SNR injection systems based on ammonia or urea. 2 figs, 13 tabs.

  7. Report on the achievements in the Sunshine Project in fiscal 1990 on research and development of coal energy. Studies on coal liquefying catalysts and a method for analyzing liquefied oil; 1990 nendo sekitan ekikayo shokubai oyobi ekikayu bunsekiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1990 on research of coal liquefying catalysts and a method for analyzing liquefied oil. Regenerating deteriorated hydrogenating catalysts for coal liquefied oil makes the restoration non-reversible because of residual sulfate. Discussions were given on the regenerating mechanisms. It was found that adding Ru enhances activity of an Ni-Mo catalyst for hydrogenating denitrification and hydrogenation. In studying coal liquefying reaction, a basic study was performed to analyze a catalytic mechanism in the hydrogenating decomposition. Sequential lightening reaction process is being analyzed at molecular levels on coal, preasphaltene, asphaltene and oil. Investigations were carried out on hydrogenating denitrification, deoxygenation, ring opening, decomposition mechanism and catalytic action. A study on precision structural analysis has begun on PSU circulating solvent as a NEDO bituminous coal liquefaction supporting technology. In fiscal 1990, a preliminary study was performed to identify the overall image of the composition of the Wandoan coal liquefied oil. Detailed analysis was executed on naphthalenes and their hydrides. This paper also describes composition analysis and reaction analysis by using the GC/MS ion chromatogram method. It also dwells on the study on catalyst utilizing systems. (NEDO)

  8. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis

    Directory of Open Access Journals (Sweden)

    Tańczuk Mariusz

    2017-01-01

    Full Text Available District heating technologies should be efficient, effective and environmentally friendly. The majority of the communal heating systems in Poland produce district hot water in coal-fired boilers. A large number of them are considerably worn out, low-efficient in the summer time and will not comply with forthcoming regulations. One of the possible solution for such plants is repowering with new CHP systems or new boilers fuelled with fuels alternative to coal. Optimisation analysis of the target configuration of municipal heat generating plant is analysed in the paper. The work concerns repowering the existing conventional heat generating plant according to eight different scenarios of the plant configuration meeting technical and environmental requirements forecasted for the year of 2035. The maximum demand for heat of the system supplied by the plant is 185 MW. Taking into account different technical configurations on one side, and different energy and fuel prices on the other side, the comparative cost-benefits analysis of the assumed scenarios has been made. The basic economical index NPV (net present value has been derived for each analysed scenario and the results have been compared and discussed. It was also claimed that the scenario with CHP based on ICE engines is optimal.

  9. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis

    Science.gov (United States)

    Tańczuk, Mariusz; Radziewicz, Wojciech; Olszewski, Eligiusz; Skorek, Janusz

    2017-10-01

    District heating technologies should be efficient, effective and environmentally friendly. The majority of the communal heating systems in Poland produce district hot water in coal-fired boilers. A large number of them are considerably worn out, low-efficient in the summer time and will not comply with forthcoming regulations. One of the possible solution for such plants is repowering with new CHP systems or new boilers fuelled with fuels alternative to coal. Optimisation analysis of the target configuration of municipal heat generating plant is analysed in the paper. The work concerns repowering the existing conventional heat generating plant according to eight different scenarios of the plant configuration meeting technical and environmental requirements forecasted for the year of 2035. The maximum demand for heat of the system supplied by the plant is 185 MW. Taking into account different technical configurations on one side, and different energy and fuel prices on the other side, the comparative cost-benefits analysis of the assumed scenarios has been made. The basic economical index NPV (net present value) has been derived for each analysed scenario and the results have been compared and discussed. It was also claimed that the scenario with CHP based on ICE engines is optimal.

  10. Australian coal

    Energy Technology Data Exchange (ETDEWEB)

    1985-11-01

    Total export shipments of coal in Australia in the year ending June 30 1985 reached a record of 83.8 Mt. The export trade is expected to bring in an income of 4 billion Australian dollars in the current year making coal Australia's biggest revenue-earning export commodity. This article presents a brief overview of the Australian coal industry with production and export statistics and information on major open pit and underground mines.

  11. Report on the research achievements in the Sunshine Project in fiscal 1992. Studies on liquefying reaction in coal, and reforming and utilization of the products; 1992 nendo sekitan no ekika hanno to seiseibutsu no kaishitsu riyo no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1992 in studies on liquefying reaction in coal, and reforming of the products. High conversion rate was attained in the co-treatment of bitumen and Taiheiyo coals by using highly dispersing oil soluble solvent without performing coking, even if the asphaltene concentration is high. When a very highly acidic trifluoromethane sulfonic acid catalyst is used, hydrogenation and conversion to solubilized low molecules is possible even with a solvent having low affinity with coal. Swelling effect by tetralin is remarkable in pulverized coal, and the conversion rate was improved greatly under high-pressure hydrogen. When naphtha of the Wandoan coal liquefied oil is given extraction treatment with base and acid/base, the gas production decreases noticeably when hydrogenating and refining the extracts, resulting in reduced hydrogen consumption and improved oil recovery rate. Furthermore, when the extraction treated naphtha is hydrogenated, denitrification can be achieved completely. Kerosene and light oil liquefied from the Wandoan coal were cracked by fluidity contact, whereas the light gravity product yield due to the decomposition was found low because of containing a great amount of two-ring aromatics. The pressure crystal deposition method using solvent is effective in separation of high-melting point compounds including anthracene from heavy gravity oil. (NEDO)

  12. FY 2000 report on the survey of the overseas geological structure. Japan-China joint coal exploration - Yu Xian project; 2000 nendo kaigai chishitsu kozo nado chosa hokokusho. Nippon Chugoku sekitan kyodo tansa Yu Xian project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The geological survey was carried out which is needed for coal mine design in the Yu Xian coal mine area, Yu Xian coal field, Hebei province, China. The term of survey was 5 years from 1996 to 2000. Activities are mainly for seismic survey and boring survey. Japan was in charge of the seismic survey, and China in charge of the boring survey. Both attained the goal. The results of the activities were summed up in the following 7 items: 1) outline of the survey; 2) general investigation; 3) state of the exploration related materials/machinery; 4) field survey; 5) items of survey; 6) results of the survey; 7) conclusion. In 6), the geological analysis, coal quality survey and coal amount survey were conducted. In the geological analysis, analyzed were the succession of strata, geological structure, and the situation of existence of coal seams. In 7), the following were made clear: geological structure of the survey area, coal seam, coal quality, hydrological geology, other conditions of drilling technology, and coal amount. The coal amount was 328.34 million tons in a total of A/B/C class coals. The total coal amount of Nos. 1 and 5 coal seams was 259.79 million tons, which was 79.1% of the total coal amount in all area. The average thickness of Nos. 1 and 5 coal seams, which are the main minable coal seams, was 3.10m and 2.66m, respectively. (NEDO)

  13. Coal - 96

    International Nuclear Information System (INIS)

    Sparre, C.

    1996-09-01

    The report deals mainly with coal consumption, but also gives some information about technology, environmental aspects and markets. Data have been collected by questionnaires or via telephone. The use of steam coal for heating was 0.8 Mtons (down 20% from 1994). Cogeneration plants were the main users. Taxes and environmental reasons cause a reduction of the coal use that will probably continue the next years. Use of steam coal in industry has been constant at a level of 0.7 Mtons. The import of metallurgical coal rests constant at a level of 1.6 Mtons. 1.2 Mtons of coke was produced, and 0.3 Mtons imported. The PFBC-plant at Vaertan, Stockholm used 0.13 Mtons of coal, while some coal fired power plants have been converted to peat and wood fuels. The average price of steam coal imported to Sweden in 1995 was 333 SEK/ton, 6% higher than in 1994. The contract prices for delivery 1996 are about the same as at the end of 1995. All cogeneration plants have some sort of SO 2 removal system, mostly wet-dry. The largest plant, at Vaesteraas, has recently invested in a SCR system for NO x removal. Most other plants are using low NO x burners or SNCR systems, based on ammonia or urea, which reduce the emissions 50 - 70%. Some statistic about the world coal market is also given in the report

  14. Projection of coal prices in international turnover in comparison to other primary energy sources; Przewidywane ceny wegla w handlu miedzynarodowym w porownaniu z innymi nosnikami energii pierwotnej

    Energy Technology Data Exchange (ETDEWEB)

    Gawlik, L.; Grudzinski, Z. [Polish Academy of Sciences, Krakow (Poland). Mineral and Energy Economy Institute

    2004-07-01

    The paper looks at trends in both steam coal and coking coal prices up to the year 2000 and then compares the trends of coal with crude oil and natural gas for the years 1987-2001. It presents forecasts for fossil fuel prices up to the year 2015. Despite temporary fluctuation, prices of coal are predicted to remain relatively stable as far as 2030, with a slight tendency to grow. 11 refs., 6 figs., 1 tab.

  15. The power of Indonesian coal

    Energy Technology Data Exchange (ETDEWEB)

    Rosiak, T. [Duke/Fluor Daniel (United States)

    2003-02-01

    The paper presents three Indonesian projects carried out by Duke/Fluor Daniel whose unique construction and operation have demonstrated the versatility and value of coal-fired power generation. These are: the construction of units 7 and 8 of the Paiton Private Power Project, a 1230 MW pulverised coal plant in Paiton, East Java; construction of a coal fired generation plant and transmission system to provide power for the expansion of a copper and gold mine on the island of Papua; and construction of four 28 MW pulverized coal units to provide 'heavy lifting' for a new mine at Batu Hijau on the island of Sumbawa. Coal was found to cost less than diesel for power generation. 2 photos.

  16. Report on the achievements in the Sunshine Project in fiscal 1986. Surveys on coal type selection and surveys on coal types (Data file); 1986 nendo tanshu sentei chosa tanshu chosa seika hokokusho. Data file

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    This data file is a data file concerning coal types for liquefaction in the report on the achievements in the surveys on coal type selection and on coal types (JN0040843). Such items of information were filed as existence and production of coals, various kinds of analyses, and test values relative to data for liquefaction tests that have been collected and sent to date. The file consists of two files of a test sample information file related to existence and production of coals and coal mines, and an analysis and test file accommodating the results of different analyses and tests. However, the test sample information files (1) through (6) have not been put into order on such items of information as test samples and sample collection, geography, geology, ground beds, coal beds, coal mines, development and transportation. The analysis and test file contains (7) industrial analyses, (8) element analysis, (9) ash composition, (10) solubility of ash, (11) structure analysis, (12) liquefaction characteristics (standard version), (13) analysis of liquefaction produced gas, (14) distillation characteristics of liquefaction produced oil, (15) liquefaction characteristics (simplified version), (16) analysis of liquefaction produced gas (simplified version), and (17) distillation characteristics of liquefaction produced oil (simplified version). However, the information related to liquefaction test using a tubing reactor in (15) through (17) has not been put into order. (NEDO)

  17. Achievement report for fiscal 1999 on project for supporting the formation of energy/environmental technology verification project. International joint verification research project (Verification project relative to ignition and NOx reduction using plasma sub-burner in pulverized coal-fired furnace); 1999 nendo plasma sabubana ni yoru bifuntan nenshoro ni okeru chakka oyobi NO{sub x} teigen gijutsu ni kansuru jissho project seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project is executed through the cooperation of a Russian research institute, Akita Prefectural University, and the Ishikawajima-Harima Heavy Industries Co., Ltd. In the development of a plasma sub-burner and the basic research for its verification, a pulverized coal burning plasma sub-burner is designed and fabricated, a basic burning experiment is conducted for the plasma sub-burner, and plasma stabilization in a pulverized coal flow is simulated. In the verification study of the ignition by the plasma sub-burner in a pulverized coal-fired furnace, it is found that the newly-developed plasma sub-burner satisfies the prescribed operating conditions in the system and that the ignition of pulverized coal takes place across the air ratio range of 0.5-1.5 when pulverized coal is fed to the sub-burner. It is also found that NOx is reduced a great deal when a plasma operating on an orifice gas of air or nitrogen is generated in a gas which contains NOx. (NEDO)

  18. Coal summit II

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Various papers were presented on world coal trade. Papers include: Poland as a producer and exporter of coal; the dynamics of world coal trade; Cerrejon coal production perspectives; present state of the Australian coal industry; present state of the EC coal market and future prospects; prospects of US coal exports to Europe; forecast of Italian coal supply and demand through 1990; statistics from coal transportation outlook; status of world coal ports.

  19. The World Coal Quality Inventory: South America

    Science.gov (United States)

    Karlsen, Alex W.; Tewalt, Susan J.; Bragg, Linda J.; Finkelman, Robert B.

    2006-01-01

    Executive Summary-Introduction: The concepts of a global environment and economy are strongly and irrevocably linked to global energy issues. Worldwide coal production and international coal trade are projected to increase during the next several decades in an international energy mix that is still strongly dependent on fossil fuels. Therefore, worldwide coal use will play an increasingly visible role in global environmental, economic, and energy forums. Policy makers require information on coal, including coal quality data, to make informed decisions regarding domestic coal resource allocation, import needs and export opportunities, foreign policy objectives, technology transfer policies, foreign investment prospects, environmental and health assessments, and byproduct use and disposal issues. The development of a worldwide, reliable, coal quality database would help ensure the most economically and environmentally efficient global use of coal. The U.S. Geological Survey (USGS), in cooperation with many agencies and scientists from the world's coal producing countries, originally undertook a project to obtain representative samples of coal from most of the world's producing coal provinces during a limited period of time (roughly 1998-2005), which is called the World Coal Quality Inventory (WoCQI). The multitude of producing coal mines, coal occurrences, or limited accessibility to sites in some countries can preclude collecting more than a single sample from a mine. In some areas, a single sample may represent an entire coal mining region or basin. Despite these limitations in sampling and uneven distribution of sample collection, the analytical results can still provide a general overview of world coal quality. The USGS intends to present the WoCQI data in reports and, when possible, in Geographic Information System (GIS) products that cover important coal bearing and producing regions.

  20. Report on the FY 1999 project for training coal engineers. Advanced course; 1999 nendo sekitan gijutsusha yosei jigyo hokokusho. Jokyusha course

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This is a report on the training for coal technology which two Japanese engineers received in Australia. In Chapter 3 (Outline of Australia), they studied the national land, constitution of the national land, population, history, politics, economy and trade. In Chapter 4 (Coal geology), they read lecture data of university. In Chapter 5 (Outline of coal supply/demand), the coal export amount from Australia is 167 million tons. Steam coal of a little less than 50% is exported to Japan. In Chapter 6 (Coal mining technology), 100 million tons of NSW state and 100 million and 570 thousand tons of QLD state are mined by underground mining and open pit mining. Training was conducted on overburden/drilling/transportation of the open pit mining coal. As coal mining methods of underground mining, they learned the board and pillar coal mining and high wall mining as an extension of open pit mining. In Chapter 7 (Coal preparation), they observed/studied the jig, heavy media separator, heavy media cyclone separator, flotation equipment, spiral ore dressing equipment, fine powder centrifugal dewatering equipment, thickener, sieve, etc. They studied by data or by observation in Chapters 8 (Outline of coal mine), 9 (Outline of export port), 10 (Outline of railroad transportation), and 11 (Quality management). (NEDO)

  1. Coal 99; Kol 99

    Energy Technology Data Exchange (ETDEWEB)

    Sparre, C

    2000-07-01

    in equipment for burning pellets instead of coal. In Linkoeping waste of rubber is mixed with coal. Also Soederenergi AB has rebuilt their three coal boilers and replaced 100 % of the coal by peat and wood fuels. Coal is a reserve fuel. Several co-generation plants like Linkoeping, Norrkoeping, Uppsala and Oerebro use both coal and forest fuels. The use of coal is then concentrated to the electricity production. The average price of steam coal imported in Sweden in 1998 was 370 SEK/ton or the same as in 1997. For the world, the average import price fell about 6 USD/ton to 32 USD/ton. The price fall was concentrated to the 4th quarter. The prices have continued to fall during 1999 as a result of the crisis in Asia but are now stabilising as a result of increasing oil prices. All Swedish plants meet their emission limits of dust, SO{sub 2} and NO{sub x}, given by county administrations or concession boards. The co-generation plants have all some sort of SO{sub 2}-removal system. Mostly used is the wet-dry method. The biggest co-generation plant, in Vaesteraas, has recently invested in a catalytic NO{sub x}-cleaning system type SCR, which is reducing the emission level 80-90 %. Most other plants are using low NO{sub x}- burners or injection systems type SNCR, based on ammonium or urea, which are reducing the emissions 50-70 %. A positive effect of the recently introduced NO{sub x}-duties is a 60 % reduction compared to some years ago, when the duties were introduced. World hard coal production was about 3 700 tons in 1998, a minor decrease compared to 1997. The trade, however, has increased about 3 % to 520 mill tons. The coal demand in the OECD-countries has increased about 1,7 % yearly during the last ten years. The coal share of the energy supply is about 20% in the OECD-countries and 27% in the whole world. Several sources estimate a continuing growth during the next 20 years in spite of an increasing use of natural gas and nuclear power. The reason is a strong

  2. Clean coal technology: The new coal era

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The Clean Coal Technology Program is a government and industry cofunded effort to demonstrate a new generation of innovative coal processes in a series of full-scale showcase`` facilities built across the country. Begun in 1986 and expanded in 1987, the program is expected to finance more than $6.8 billion of projects. Nearly two-thirds of the funding will come from the private sector, well above the 50 percent industry co-funding expected when the program began. The original recommendation for a multi-billion dollar clean coal demonstration program came from the US and Canadian Special Envoys on Acid Rain. In January 1986, Special Envoys Lewis and Davis presented their recommendations. Included was the call for a 5-year, $5-billion program in the US to demonstrate, at commercial scale, innovative clean coal technologies that were beginning to emerge from research programs both in the US and elsewhere in the world. As the Envoys said: if the menu of control options was expanded, and if the new options were significantly cheaper, yet highly efficient, it would be easier to formulate an acid rain control plan that would have broader public appeal.

  3. PNNL Coal Gasification Research

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Douglas J.; Cabe, James E.; Bearden, Mark D.

    2010-07-28

    This report explains the goals of PNNL in relation to coal gasification research. The long-term intent of this effort is to produce a syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in materials, catalysts, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for 4 hours using coal feedstock. In addition, system modifications to increase operational flexibility and reliability or accommodate other fuel sources that can be used for syngas production could be useful.

  4. International Coal Report's coal year 1991

    Energy Technology Data Exchange (ETDEWEB)

    McCloskey, G [ed.

    1991-05-31

    Following introductory articles on factors affecting trade in coal and developments in the freight market, tables are given for coal exports and coal imports for major countries worldwide for 1989 and 1990. Figures are also included for coal consumption in Canada and the Eastern bloc,, power station consumption in Japan, coal supply and demand in the UK, electric utility coal consumption and stocks in the USA, coal production in Australia, Canada and USA by state, and world hard coal production. A final section gives electricity production and hard coal deliveries in the EEC, sales of imported and local coal and world production of pig iron and steel.

  5. Coal fires in Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Whitehouse, Alfred E.; Mulyana, Asep A.S. [Office of Surface Mining/Ministry of Energy and Mineral Resources Coal Fire Project, Ministry of Energy and Mineral Resources, Agency for Training and Education, Jl. Gatot Subroto, Kav. 49, Jakarta 12950 (Indonesia)

    2004-07-12

    Indonesia's fire and haze problem is increasingly being ascribed to large-scale forest conversion and land clearing activities making way for pulpwood, rubber and oil palm plantations. Fire is the cheapest tool available to small holders and plantation owners to reduce vegetation cover and prepare and fertilize extremely poor soils. Fires that escaped from agricultural burns have ravaged East Kalimantan forests on the island of Borneo during extreme drought periods in 1982-1983, 1987, 1991, 1994 and 1997-1998. Estimates based on satellite data and ground observations are that more than five million hectares were burned in East Kalimantan during the 1997/1998 dry season. Not only were the economic losses and ecological damage from these surface fires enormous, they ignited coal seams exposed at the ground surface along their outcrops.Coal fires now threaten Indonesia's shrinking ecological resources in Kutai National Park and Sungai Wain Nature Reserve. Sungai Wain has one of the last areas of unburned primary rainforest in the Balikpapan-Samarinda area with an extremely rich biodiversity. Although fires in 1997/1998 damaged nearly 50% of this Reserve and ignited 76 coal fires, it remains the most valuable water catchment area in the region and it has been used as a reintroduction site for the endangered orangutan. The Office of Surface Mining provided Indonesia with the capability to take quick action on coal fires that presented threats to public health and safety, infrastructure or the environment. The US Department of State's Southeast Asia Environmental Protection Initiative through the US Agency for International Development funded the project. Technical assistance and training transferred skills in coal fire management through the Ministry of Energy and Mineral Resource's Training Agency to the regional offices; giving the regions the long-term capability to manage coal fires. Funding was also included to extinguish coal fires as

  6. Development of coal energy utilization technologies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Coal liquefaction produces new and clean energy by performing hydrogenation, decomposition and liquefaction on coal under high temperatures and pressures. NEDO has been developing bituminous coal liquefaction technologies by using a 150-t/d pilot plant. It has also developed quality improving and utilization technologies for liquefied coal, whose practical use is expected. For developing coal gasification technologies, construction is in progress for a 200-t/d pilot plant for spouted bed gasification power generation. NEDO intends to develop coal gasification composite cycle power generation with high efficiency and of environment harmonious type. This paper summarizes the results obtained during fiscal 1994. It also dwells on technologies to manufacture hydrogen from coal. It further describes development of technologies to manufacture methane and substituting natural gas (SNG) by hydrogenating and gasifying coal. The ARCH process can select three operation modes depending on which of SNG yield, thermal efficiency or BTX yield is targeted. With respect to promotion of coal utilization technologies, description is given on surveys on development of next generation technologies for coal utilization, and clean coal technology promotion projects. International coal utilization and application projects are also described. 9 figs., 3 tabs.

  7. Biomass CFB gasifier connected to a 350 MW{sub t}h steam boiler fired with coal and natural gas - THERMIE demonstration project in Lahti in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, J. [Foster Wheeler Energia Oy, Varkaus (Finland). Varkaus Global New Products

    1997-12-31

    Laempoevoima Oy`s Kymijaervi power plant gasification project is to demonstrate the direct gasification of wet biofuel and the use of hot, raw and very low-calorific gas directly in the existing coal-fired boiler. The gasification of biofuels and co-combustion of gases in the existing coal-fired boiler offers many advantages such as: recycling of CO{sub 2}, decreased SO{sub 2} and NO{sub x} emissions, efficient way to utilize biofuels and recycled refuse fuels, low investment and operation costs, and utilization of the existing power plant capacity. Furthermore, only small modifications are required in the boiler, possible disturbances in the gasifier do not shut down the power plant. (author)

  8. Biomass CFB gasifier connected to a 350 MW{sub t}h steam boiler fired with coal and natural gas - THERMIE demonstration project in Lahti in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, J [Foster Wheeler Energia Oy, Varkaus (Finland). Varkaus Global New Products

    1998-12-31

    Laempoevoima Oy`s Kymijaervi power plant gasification project is to demonstrate the direct gasification of wet biofuel and the use of hot, raw and very low-calorific gas directly in the existing coal-fired boiler. The gasification of biofuels and co-combustion of gases in the existing coal-fired boiler offers many advantages such as: recycling of CO{sub 2}, decreased SO{sub 2} and NO{sub x} emissions, efficient way to utilize biofuels and recycled refuse fuels, low investment and operation costs, and utilization of the existing power plant capacity. Furthermore, only small modifications are required in the boiler, possible disturbances in the gasifier do not shut down the power plant. (author)

  9. Report on the achievements in the Sunshine Project in fiscal 1992 on research and development of coal energy. Studies on coal liquefying catalysts and a method for analyzing liquefied oil; 1992 nendo sekitan ekikayo shokubai oyobi ekikayu bunsekiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1992 on research of coal liquefying catalysts and a method for analyzing liquefied oil. Oxidative regeneration was performed on an Ni-W based waste catalyst used in reforming (hydrogenating) coal liquefied light oil fraction. If the regeneration can be done with low oxygen partial pressure and step-wise temperature rise, the activity after the regeneration can be restored to the level of a new catalyst, with sulfate production being suppressed. Model reaction was discussed by changing the amount of W and Mo carried by alumina. Suppressing the carrying amount can control the hydrogenation activity and the hydrogenating decomposition activity. Comparison was given on compositions of woods and such hydrogenation products as peat and coal. Analysis was performed on composition of the circulating solvent used in the NEDO bituminous coal liquefying PSU. In the initial stage of the operation, the solvent had higher concentrations in the groups of compounds not having alkyl groups, and compounds having the alkyl groups increased in the end of the operation. Discussions were given also on index materials to control the operation of solvent hydrogenating process. Efficient preparation conditions were discussed on an iron sulfide particulate catalyst that utilizes surface reaction of a solid metal while mechanical impact such as vibration is being given. Effects of the catalyst concentration in coal liquefaction were experimented by using oil soluble molybdenum, wherein no change was found in the reaction mechanism. (NEDO)

  10. Biochemical Removal of HAP Precursors From Coal

    International Nuclear Information System (INIS)

    Olson, G.; Tucker, L.; Richards, J.

    1997-07-01

    This project addresses DOE's interest in advanced concepts for controlling emissions of air toxics from coal-fired utility boilers. We are determining the feasibility of developing a biochemical process for the precombustion removal of substantial percentages of 13 inorganic hazardous air pollutant (HAP) precursors from coal. These HAP precursors are Sb, As, Be, Cd, Cr, Cl, Co, F, Pb, Hg, Mn, Ni, and Se. Although rapid physical coal cleaning is done routinely in preparation plants, biochemical processes for removal of HAP precursors from coal potentially offer advantages of deeper cleaning, more specificity, and less coal loss. Compared to chemical processes for coal cleaning, biochemical processes potentially offer lower costs and milder process conditions. Pyrite oxidizing bacteria, most notably Thiobacillusferrooxidans, are being evaluated in this project for their ability to remove HAP precursors from U.S. coals

  11. Biochemical Removal of HAP Precursors From Coal

    Energy Technology Data Exchange (ETDEWEB)

    Olson, G.; Tucker, L.; Richards, J.

    1997-07-01

    This project addresses DOE`s interest in advanced concepts for controlling emissions of air toxics from coal-fired utility boilers. We are determining the feasibility of developing a biochemical process for the precombustion removal of substantial percentages of 13 inorganic hazardous air pollutant (HAP) precursors from coal. These HAP precursors are Sb, As, Be, Cd, Cr, Cl, Co, F, Pb, Hg, Mn, Ni, and Se. Although rapid physical coal cleaning is done routinely in preparation plants, biochemical processes for removal of HAP precursors from coal potentially offer advantages of deeper cleaning, more specificity, and less coal loss. Compared to chemical processes for coal cleaning, biochemical processes potentially offer lower costs and milder process conditions. Pyrite oxidizing bacteria, most notably Thiobacillusferrooxidans, are being evaluated in this project for their ability to remove HAP precursors from U.S. coals.

  12. Coal's sleeping market: non-utility generators

    International Nuclear Information System (INIS)

    McMahan, R.L.; Knutson, K.S.

    1992-01-01

    The article briefly profiles the coal market for non-utility generation (NUG). Coal consumption by NUGs, currently estimated at around 6.1 million tons, is projected to reach nearly 13.6 million tons by 1995 and 21.2 million tons by 2000. If the projected growth is achieved the NUG market may become one of the strongest market segments for the coal industry into the next century. 3 figs., 2 tabs

  13. Numerical Investigation into the Impact of CO2-Water-Rock Interactions on CO2 Injectivity at the Shenhua CCS Demonstration Project, China

    Directory of Open Access Journals (Sweden)

    Guodong Yang

    2017-01-01

    Full Text Available A 100,000 t/year demonstration project for carbon dioxide (CO2 capture and storage in the deep saline formations of the Ordos Basin, China, has been successfully completed. Field observations suggested that the injectivity increased nearly tenfold after CO2 injection commenced without substantial pressure build-up. In order to evaluate whether this unique phenomenon could be attributed to geochemical changes, reactive transport modeling was conducted to investigate CO2-water-rock interactions and changes in porosity and permeability induced by CO2 injection. The results indicated that using porosity-permeability relationships that include tortuosity, grain size, and percolation porosity, other than typical Kozeny-Carman porosity-permeability relationship, it is possible to explain the considerable injectivity increase as a consequence of mineral dissolution. These models might be justified in terms of selective dissolution along flow paths and by dissolution or migration of plugging fines. In terms of geochemical changes, dolomite dissolution is the largest source of porosity increase. Formation physical properties such as temperature, pressure, and brine salinity were found to have modest effects on mineral dissolution and precipitation. Results from this study could have practical implications for a successful CO2 injection and enhanced oil/gas/geothermal production in low-permeability formations, potentially providing a new basis for screening of storage sites and reservoirs.

  14. Clean coal technology

    International Nuclear Information System (INIS)

    Abelson, P.H.

    1990-01-01

    One of the major technology challenges in the next decade will be to develop means of using coal imaginatively as a source of chemicals and in a more energy-efficient manner. The Clean Air Act will help to diminish the acid rain but will not reduce CO 2 emissions. The Department of Energy (DOE) is fostering many innovations that are likely to have a positive effect on coal usage. Of the different innovations in the use of coal fostered by DOE, two are of particular interest. One is the new pressurized fluid bed combustion (PFBC) combined-cycle demonstration. The PFBC plant now becoming operational can reduce SO 2 emissions by more than 90% and NO x emissions by 50-70%. A second new technology co-sponsored by DOE is the Encoal mild coal gasification project that will convert a sub-bituminous low-BTU coal into a useful higher BTU solid while producing significant amounts of a liquid fuel

  15. Bright outlook for coal

    International Nuclear Information System (INIS)

    Anon

    2001-01-01

    After enduring contract price cuts over the past two years of almost 17% for thermal coal and 23% for hard coking coal, the New South Wales coal industry is looking forward to a reversal of fortune for 2001. Increased export demand, improved prices, significant improvements in mine site productivity, a weak Australian dollar and the probability of a number of new projects or extensions progressing to development are likely to result in an increase in NSW saleable production to around 110 million tonnes (Mt) in 2000-01. Sharply weaker coal prices over the past two years, intensified international competition and the Asian economic downturn had a negative impact on profitability, investment, exports and employment in the NSW coal industry. As a result, the industry has undergone substantial restructuring. The restructuring process has led to a consolidation in ownership, reduced production costs and improved operational efficiency. The outcome is an industry well positioned to take advantage of the positive market conditions and one likely to experience levels of profitability not achieved over the past few years

  16. Coal liquids -- Who needs them?

    International Nuclear Information System (INIS)

    Gray, D.; Tomlinson, G.

    1995-01-01

    The paper discusses the global energy demand situation as presented at the last World Energy Congress. The total energy demand was calculated for each country and projected to 2100. The paper then discusses the energy situation in the United States, especially the forecasted demand for crude oil and natural gas liquids. Imports will be needed to make up the shortfall in domestic production. The shortfall in conventional petroleum could be supplied by converting coal into liquid fuels. Currently the cost of high quality coal liquids is too high to compete with petroleum, but trends suggest that the price will be competitive in the year 2030 using current technology. Continuing research on coal liquefaction will reduce the price of coal liquids so that coal liquids could play a significant role sooner

  17. Clean coal technology and advanced coal-based power plants

    International Nuclear Information System (INIS)

    Alpert, S.B.

    1991-01-01

    Clean Coal Technology is an arbitrary terminology that has gained increased use since the 1980s when the debate over acid raid issues intensified over emissions of sulfur dioxide and nitrogen oxides. In response to political discussions between Prime Minister Brian Mulroney of Canada and President Ronald Reagan in 1985, the US government initiated a demonstration program by the Department of Energy (DOE) on Clean Coal Technologies, which can be categorized as: 1. precombustion technologies wherein sulfur and nitrogen are removed before combustion, combustion technologies that prevent or lower emissions as coal is burned, and postcombustion technologies wherein flue gas from a boiler is treated to remove pollutants, usually transforming them into solids that are disposed of. The DOE Clean Coal Technology (CCT) program is being carried out with $2.5 billion of federal funds and additional private sector funds. By the end of 1989, 38 projects were under way or in negotiation. These projects were solicited in three rounds, known as Clean Coal I, II, and III, and two additional solicitations are planned by DOE. Worldwide about 100 clean coal demonstration projects are being carried out. This paper lists important requirements of demonstration plants based on experience with such plants. These requirements need to be met to allow a technology to proceed to commercial application with ordinary risk, and represent the principal reasons that a demonstration project is necessary when introducing new technology

  18. The underground coal gasification First step of community collaboration; Gasification Subterranea del Carbon. Primer Intento en el Ambito de una Colaboracion Comunitaria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The objective of the project was to demonstrate the technical feasibility of underground coal gasification in coal seams at 600 metre depth, in order to asses its potential as a means of energy exploitation in Europe. The trial was based on the use of deviated boreholes and a retractable injection system techniques, which have both been developed by the oil and gas industries. One borehole, the injection well, was drilled in the coal seam. The other, the vertical production well, was run to intercept it in the lower part of the coal seam as closely as possible, in order to construct a continuous channel for gasification. The well were completed with casing and concentric tubing to provide the necessary paths for production, injection, purging gas and cooling water flows. A coiled tubing located in the injection well was used to execute the retraction (or CRIP) manoeuvre, which is a process in which the injector head for the gasification agents, i. e. oxygen and water, and the ignitor, are directed to a specific section of the coal seam. The gasification products passes to a surface production line for flow measurement and sampling of gas and condensate products. Production gases were either flared or incinerated, while the liquids were collected for appropriate disposal. The first trial achieved its principal objectives of in seam drilling, channel communication, the CRIP manoeuvres and the gasification of significant quantity of coal. The post-gasification study also identified the shape and extent of the cavity. The study has demonstrated the technical feasibility of underground coal gasification at the intermediate depths of European coal and proposals are made for further development and semi-commercial exploitation of this promising extraction technology. (Author) 11 refs.

  19. Coal competitiveness?

    International Nuclear Information System (INIS)

    Rogeaux, B.

    2006-01-01

    Will coal electrical plants be more competitive in the coming years? Answering this one cannot be limited to merely comparing estimates based on reference electricity production costs. The competitiveness of coal will indeed depend on the final product marketed, as the MWhs are not equal: is the purpose to produce base, half-base MWh? Does the electrical equipment structure require flexible MWh (for instance in the event of significant intermittent renewable energy amounts), and therefore plants able to adjust their power rapidly? But the competitiveness of coal will also depend on many factors that will correct reference cost estimates: uncertainties, risks, externalities. These factors will need to be appreciated on a case by case basis. We introduce some of the reasoning used to better appreciate the future competitiveness of coal, and the main factors conditioning it in three contrasting regions of the world: Europe, USA, china. (author)

  20. Survey of state water laws affecting coal slurry pipeline development

    Energy Technology Data Exchange (ETDEWEB)

    Rogozen, M.B.

    1980-11-01

    This report summarizes state water laws likely to affect the development of coal slurry pipelines. It was prepared as part of a project to analyze environmental issues related to energy transportation systems. Coal slurry pipelines have been proposed as a means to expand the existing transportation system to handle the increasing coal shipments that will be required in the future. The availability of water for use in coal slurry systems in the coal-producing states is an issue of major concern.

  1. Preliminary survey report for fiscal 1999 on engineer exchange project (field of coal mining technology), international exchange project. Europe; 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo jizen chosa. Oshu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Europe, international division is in progress as the result of market internationalization, and the coal market is experiencing an increasingly intensive competition in the storm of deregulation. The coal industry of Britain is away from a crisis for the time being, thanks to a new 5-year contract concluded with the electric utilities who are the primary purchasers, but it has to compete with imported coal and natural gas. The industry is also hit by the control imposed on the development of new opencast coal mines. Production is on the decline in the German coal market, which is one the largest in Western Europe, due to reduced subsidies, unfavorable geological conditions, lowered price, etc. The German coal industry is positively striving to exploit coal mines overseas and to export coal mining technologies. In Spain and France, the coal industry is forced to shrink and, in France, there is a plan to terminate coal mining completely in 2005. In Poland, the introduction of market economy has resulted in the influx of low-price coal from Russia etc., and all the Polish mines are now in the red. Its joining the European Union in the near future will further increase the pressure from other nations. It is learned that in Britain, Germany, etc., coal businesses are accelerating their transfer of technology to developing countries and are positively strengthening their presence abroad. (NEDO)

  2. Coal - 97

    International Nuclear Information System (INIS)

    Sparre, C.

    1997-01-01

    The report deals with the use of coal and coke during 1996. Some information about techniques, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from SCB have also been used. The use of steam coal for heating purposes during 1996 was 1,2 mill tons and 50% higher than in 1995. The increase is probably temporary and due to high prices of electricity because of lack of water power. The co-generation plants were the main users of coal. The minor plants have increased their use of forest fuels. Probably the use of steam coal will go down in the immediate years both in the heat generating and the co-generation plants. During the top year 1987 coal was used in 18 hotwater plants and 11 co-generation plants. 1996 these figures are 3 and 12. Taxes and environmental reasons explain this trend. The use of steam coal in the industry has been constant at the level 700 000 tons. This level is supposed to be constant or to vary with business cycles. The import of metallurgical coal in 1996 was 1,6 mill tons like the year before. 1,2 mill tons coke were produced. The coke consumption in the industry was 1,5 mill tons. 0,3 mill tons of coke were imported. The average price of steam coal imported in Sweden in 1996 was 340 SEK/ton or 2% higher than in 1995. For the world, the average import price was 51,5 USD/ton, nearly the same as the year before. The contract prices for delivery during 1997 are about equal as the end of 1996. All Swedish plants meet their emission limits of dust, SO 2 and NO x given by county administrations or concession boards

  3. Power Generation from Coal 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This report focuses mainly on developments to improve the performance of coal-based power generation technologies, which should be a priority -- particularly if carbon capture and storage takes longer to become established than currently projected. A close look is taken of the major ongoing developments in process technology, plant equipment, instrumentation and control. Coal is an important source of energy for the world, particularly for power generation. To meet the growth in demand for energy over the past decade, the contribution from coal has exceeded that of any other energy source. Additionally, coal has contributed almost half of total growth in electricity over the past decade. As a result, CO2 emissions from coal-fired power generation have increased markedly and continue to rise. More than 70% of CO2 emissions that arise from power generation are attributed to coal. To play its role in a sustainable energy future, its environmental footprint must be reduced; using coal more efficiently is an important first step. Beyond efficiency improvement, carbon capture and storage (CCS) must be deployed to make deep cuts in CO2 emissions. The need for energy and the economics of producing and supplying it to the end-user are central considerations in power plant construction and operation. Economic and regulatory conditions must be made consistent with the ambition to achieve higher efficiencies and lower emissions. In essence, clean coal technologies must be more widely deployed.

  4. Research report of FY 1997 on the environmentally acceptable coal utilization system introduction support project. Demonstration project of circulating fluidized bed boiler (Jinzhou Coal-Thermal Power Corporation); 1997 nendo seika hokokusho (kankyo chowagata sekitan riyo system donyu shien jigyo). Junkan ryudosho boiler ni kakawaru jissho jigyo (Jinzhou netsuden sokoji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    To verify the clean coal technology to be diffused in China and consolidate its diffusion basis, demonstration project of circulating fluidized bed boiler was conducted through the cooperation with China which is positive in its introduction. This report describes its characteristics. Coal and limestone are supplied in a lower part of combustion chamber, and are mixed with circulating ash by fluidized air for combustion. Densely fluidized bed the same as the bubbling fluidized bed is formed in the lower part of combustion chamber, which provides excellent stability in ignition and combustion. Particles including ash, char and limestone formed during the combustion are discharged into the cyclone through the convection heat transfer part at the outlet of combustion chamber with the combustion gas flow. Since the gas temperature is lowered to 400 to 500degC at the convection heat transfer part, troubles of the ash circulating system can be prevented. The combustion gas separated from ash at the cyclone is discharged through the heat exchanger and precipitator, and the collected ash is returned to the lower part of combustion chamber. In FY 1997, design, fabrication, procurement/inspection, field survey/meeting, survey of visitors/meeting, and education were carried out. 4 figs., 4 tabs.

  5. FY 1980 Report on results of Sunshine Project. Development of coal liquefaction techniques (Development of materials for the coal liquefaction plant); 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sekitan ekika plant zairyo no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    A 1 T/D solvent-extraction type coal liquefaction test plant was constructed and operated to obtain the technical data for the design of, and establish the techniques for, an efficient coal liquefaction plant. The FY 1980 program includes surveys on the materials for coal liquefaction plants, covering those already developed and under development, to clarify the problematical points; drafting the test schedules; and conceptual designs of the material testing facilities. The major problems involved in the materials for coal liquefaction plants include erosion by fluidizing coal slurry, hydrogen embrittlement of the reactor materials, and corrosion by the liquefaction products (e.g., stress-corrosion cracking of austenitic steel, and corrosion by organic acids). The surveys on materials research trends suggest that USA seems to concentrate their research efforts on the reactor materials. The corrosion tests are mostly of in-plant tests, but the stress corrosion and slurry erosion tests are conducted on a laboratory scale. The conceptual designs are drawn for some testing units, e.g., the loop type material testing unit and basic testing unit for jet-spray type slurry erosion. (NEDO)

  6. Report on the achievements in the Sunshine Project in fiscal 1988. Coal energy (Studies on coal liquefying catalysts and a method for analyzing liquefied oil); 1988 nendo sekitan ekikayo shokubai oyobi ekikayu binsekiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-03-01

    The present study, as part of the studies on coal liquefying technologies, was originally intended to develop optimal catalysts that make it possible to manufacture a liquid fuel from hydrogenation treatment of coal, and establish optimal reaction operation for the liquefaction process. To achieve the intentions, studies were moved forward on the following four sub-themes: (1) fundamentals and developmental research on catalysts for the direct liquefaction, (2) chemical structures of organic constituents in the coal liquefaction process, (3) research on the optimal reaction operation in the direct coal liquefaction process, and (4) studies on nature and behavior of ash constituent in the coal liquefaction process. The current fiscal year has performed the discussions on the following items based on the achievements attained by fiscal 1987: 1. as a study on liquefaction catalysts, (1) a study on properties of liquefaction catalysts, and (2) a study on characteristics of the liquefying reaction; 2. as a study on the analytic method, (1) a study on the liquefying reaction analyzing method, and (2) a study on the liquefied oil property analyzing method. In Item 1-(1), a prototype zeolite-based catalyst having high hydrogenating decomposition activity was used to execute a reaction to lighten the liquefied oil. As a result, it was revealed that the liquefied oil can be lightened efficiently by having the oil go through a two-stage reforming reaction. (NEDO)

  7. The relationship with the Other as a platform for discussion about conflicts. Comments on the Orzesze coal mine project

    Directory of Open Access Journals (Sweden)

    Belzyt Joanna Iza

    2017-06-01

    Full Text Available An analysis was made of comments in media reports on the selected case, the „Orzesze” mining project, posted by Internet users on news websites during the period July 2014 - December 2016 This article is an attempt to examine the relationship with the Other/Alien when thinking about conflicts around investment projects which will interfere with the surrounding social and natural environment. The article considers the theories on the sources of conflict and the development of the conflict process and its consequences and suggests possible courses of action to prevent the escalation of such conflicts particularly with respect to the “Orzesze” mining project in the Upper Silesia, Poland. Taking into account that the Data, Relationship, Value, and Interest conflicts can all be sources of conflict, it should be underlined that good social communication is extremely important in the prevention and resolution of conflicts and the mitigation of their destructive influence. In a cooperation/communication oriented environment it would be much easier to focus on finding solutions rather than finding the guilty party as this can lead to an escalation of the conflict as searching for the guilty party is inextricably linked with the desire to win or to take revenge.

  8. Asia's coal and clean coal technology market potential

    International Nuclear Information System (INIS)

    Johnson, C.J.; Binsheng Li

    1992-01-01

    The Asian region is unique in the world in having the highest economic growth rate, the highest share of coal in total primary energy consumption and the highest growth rate in electricity generation capacity. The outlook for the next two decades is for accelerated efforts to control coal related emissions of particulates and SO 2 and to a lessor extent NO x and CO 2 . Only Japan has widespread use of Clean Coal Technologies (CCTs) however a number of economies have plans to install CCTs in future power plants. Only CCTs for electricity generation are discussed, and are defined for the purpose of this paper as technologies that substantially reduce SO 2 and/or NO x emissions from coal-fired power plants. The main theses of this paper are that major increases in coal consumption will occur over the 1990-2010 period, and this will be caccompanied by major increases in coal related pollution in some Asian economies. Coal fired electricity generation is projected to grow at a high rate of about 6.9 percent per year over the 1990-2010 period. CCTs are projected to account for about 150 GW of new coal-fired capacity over the 1990-2010 period of about one-third of all new coal-fired capacity. A speculative conclusion is that China will account for the largest share of CCT additions over the 1990-2010 period. Both the US and Japan have comparative advantages that might be combined through cooperation and joint ventures to gain a larger share of the evolving CCT market in Asia. 5 refs., 7 figs., 4 tabs

  9. The exergy underground coal gasification technology for power generation and chemical applications

    Energy Technology Data Exchange (ETDEWEB)

    Blinderman, M.S. [Ergo Exergy Technologies Inc., Montreal, PQ (Canada)

    2006-07-01

    Underground coal gasification (UCG) is a gasification process carried out in non-mined coal seams using injection and production wells drilled from the surface, converting coal in situ into a product gas usable for chemical processes and power generation. The UCG process developed, refined and practised by Ergo Exergy Technologies is called the Exergy UCG Technology or {epsilon}UCG{trademark} technology. This paper describes the technology and its applications. The {epsilon}UCG technology is being applied in numerous power generation and chemical projects worldwide, some of which are described. These include power projects in South Africa, India, Pakistan and Canada, as well as chemical projects in Australia and Canada. A number of {epsilon}UCG{trademark} based industrial projects are now at a feasibility usage in India, New Zealand, USA and Europe. An {epsilon}UCG{trademark} IGCC power plant will generate electricity at a much lower cost than existing fossil fuel power plants. CO{sub 2} emissions of the plant can be reduced to a level 55% less than those of a supercritical coal-fired plant and 25% less than the emissions of NG CC. 10 refs., 8 figs.

  10. Management of social and economic impacts associated with the construction of large-scale projects: experiences from the Western coal development communities

    Energy Technology Data Exchange (ETDEWEB)

    Greene, M.R.; Curry, M.G.

    1977-06-01

    The construction and operation of large-scale energy or resource development projects are accompanied by environmental, social, and economic changes or impacts. Impact assessment is the key tool used to determine which impact areas will most severely affect the community and will thus need to be managed. Impact management, only recently recognized as part of the assessment process, includes public and private actions to ameliorate impacts. The use of available impact management strategies can affect the outcome or change in the social and economic environment in a community. Therefore, an inventory of available strategies and the capabilities of local governments to use such strategies should be an integral part of any social and economic impact assessment. This provides a link between impact assessment and management. This report provides an introductory analysis to some of the more complex issues raised by social and economic impact management, with experiences cited from Western coal-development communities. Following an introduction, the paper is divided into sections corresponding to the major social and economic impacts experienced by rural communities surrounding an energy development. Each section contains a brief introductory description of the types of problems typically associated with the impact sector, and a discussion of management strategies either proposed or implemented for the impact. The management strategies are presented in tabular form, indicating the level of government responsible for implementation. 10 tables, 72 references. (MCW)

  11. Coal preparation

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The acid rain control legislation has prompted the Department of Energy (DOE) to seek new technology using the Clean Coal Technology program solicitation. The main goal of the program is to reduce SO 2 emissions below 9 Mt/a (10 million stpy) and NO x emission below 5.4 Mt/a (6 million stpy) by the year 2000. This would be accomplished by using precombustion, combustion, post combustion and conversion technology. Utilities are considering installing new scrubbers, switching fuel or possibly deep clean. However, the time required to implement the control technology is short. Due to the legislation, about 110 plants will have to adopt one of the approaches. This paper reports that in characterization of coal, Ames Laboratory used a scanning electron microscope- based, automated image analysis (SEM-AIA) technique to identify coal and mineral matter association. Various forms of organic sulfur were identified using peroxyacetic acid oxidation of coal. This was followed by subsequent microscopic, GC-MS, and HRMS analysis by Southern Illinois University. In ultrafine grinding of coal, it was reported by the Mining and Mineral Institute of Alabama that silica sand or flint shot used less energy compared to steel ball mills

  12. Observer-based Coal Mill Control using Oxygen Measurements

    DEFF Research Database (Denmark)

    Andersen, Palle; Bendtsen, Jan Dimon; S., Tom

    2006-01-01

    This paper proposes a novel approach to coal flow estimation in pulverized coal mills, which utilizes measurements of oxygen content in the flue gas. Pulverized coal mills are typically not equipped with sensors that detect the amount of coal injected into the furnace. This makes control...... of the coal flow difficult, causing stability problems and limits the plant's load following capabilities. To alleviate this problem without having to rely on expensive flow measurement equipment, a novel observer-based approach is investigated. A Kalman filter based on measurements of combustion air flow led...... into the furnace and oxygen concentration in the flue gas is designed to estimate the actual coal flow injected into the furnace. With this estimate, it becomes possible to close an inner loop around the coal mill itself, thus giving a better disturbance rejection capability. The approach is validated against...

  13. The Impact of Variability of Selected Geological and Mining Parameters on the Value and Risks of Projects in the Hard Coal Mining Industry

    Science.gov (United States)

    Kopacz, Michał

    2017-09-01

    The paper attempts to assess the impact of variability of selected geological (deposit) parameters on the value and risks of projects in the hard coal mining industry. The study was based on simulated discounted cash flow analysis, while the results were verified for three existing bituminous coal seams. The Monte Carlo simulation was based on nonparametric bootstrap method, while correlations between individual deposit parameters were replicated with use of an empirical copula. The calculations take into account the uncertainty towards the parameters of empirical distributions of the deposit variables. The Net Present Value (NPV) and the Internal Rate of Return (IRR) were selected as the main measures of value and risk, respectively. The impact of volatility and correlation of deposit parameters were analyzed in two aspects, by identifying the overall effect of the correlated variability of the parameters and the indywidual impact of the correlation on the NPV and IRR. For this purpose, a differential approach, allowing determining the value of the possible errors in calculation of these measures in numerical terms, has been used. Based on the study it can be concluded that the mean value of the overall effect of the variability does not exceed 11.8% of NPV and 2.4 percentage points of IRR. Neglecting the correlations results in overestimating the NPV and the IRR by up to 4.4%, and 0.4 percentage point respectively. It should be noted, however, that the differences in NPV and IRR values can vary significantly, while their interpretation depends on the likelihood of implementation. Generalizing the obtained results, based on the average values, the maximum value of the risk premium in the given calculation conditions of the "X" deposit, and the correspondingly large datasets (greater than 2500), should not be higher than 2.4 percentage points. The impact of the analyzed geological parameters on the NPV and IRR depends primarily on their co-existence, which can be

  14. Research report of FY 1997 on the clean coal technology promotion project and region model survey. Measures for environmental load reduction: feasibility survey on the environmental load reduction-type utilization Energy Center (interim report); 1997 nendo chosa hokokusho. Clean coal technology suishin jigyo chiiki model chosa `kankyo fuka teigen taisaku: kankyo fuka teigengata sekitan riyo energy center feasibility chosa` chosa hokokusho (chukan hokoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The survey has given an eye to the coal that it can be easily burnt together with combustible waste and supplements unstable generation of waste. Thus, the establishment of the Energy Center at the place where infrastructure of coal will be arranged, a lot of combustible waste will be expected to generate and a considerable aniybt if energy will be used, has been planned, and this survey is intended to study the scale of Energy Center, its economy and the problems to be solved. In power plant project using RDF for above-mentioned local governments, the construction of power plant and the renewal time of the existing incinerator to RDF facility can be planned separately in this system. The power plant will be economically constructed and the amount of coal can be decreased in accordance with increased RDF to meet wide range of refuse treatment. In FY 1997, the actual situation of the waste treatment and the infrastructure of coal supply was surveyed, and selection of the place suitable for the Energy Center and its scale was studied. 69 figs., 50 tabs.

  15. Distilling coal

    Energy Technology Data Exchange (ETDEWEB)

    Blythe, F C

    1914-09-14

    In the destructive distillation of bituminous coal, heavy hydrocarbon oil, such as petroleum, kerosine, shale oil, and heavy tar oil, obtained in some cases during the process, is added to the coal, which is then distilled under pressure and at a comparatively low temperature regulated so as to produce a large proportion of hydrocarbon oils and a small proportion of permanent gas. In one method, about 5 to 10 parts of hydrocarbon oil are mixed with 100 parts of crushed or ground coal, and the mixture is heated in a closed vessel, provided in some cases with an agitator, under a pressure of about 60 lb/in/sup 2/, and the temperature may be gradually raised to 350/sup 0/C and then to about 500/sup 0/C. The heating may be by means of superheated steam with or without external heat.

  16. CoalVal-A coal resource valuation program

    Science.gov (United States)

    Rohrbacher, Timothy J.; McIntosh, Gary E.

    2010-01-01

    CoalVal is a menu-driven Windows program that produces cost-of-mining analyses of mine-modeled coal resources. Geological modeling of the coal beds and some degree of mine planning, from basic prefeasibility to advanced, must already have been performed before this program can be used. United States Geological Survey mine planning is done from a very basic, prefeasibility standpoint, but the accuracy of CoalVal's output is a reflection of the accuracy of the data entered, both for mine costs and mine planning. The mining cost analysis is done by using mine cost models designed for the commonly employed, surface and underground mining methods utilized in the United States. CoalVal requires a Microsoft Windows? 98 or Windows? XP operating system and a minimum of 1 gigabyte of random access memory to perform operations. It will not operate on Microsoft Vista?, Windows? 7, or Macintosh? operating systems. The program will summarize the evaluation of an unlimited number of coal seams, haulage zones, tax entities, or other area delineations for a given coal property, coalfield, or basin. When the reader opens the CoalVal publication from the USGS website, options are provided to download the CoalVal publication manual and the CoalVal Program. The CoalVal report is divided into five specific areas relevant to the development and use of the CoalVal program: 1. Introduction to CoalVal Assumptions and Concepts. 2. Mine Model Assumption Details (appendix A). 3. CoalVal Project Tutorial (appendix B). 4. Program Description (appendix C). 5. Mine Model and Discounted Cash Flow Formulas (appendix D). The tutorial explains how to enter coal resource and quality data by mining method; program default values for production, operating, and cost variables; and ones own operating and cost variables into the program. Generated summary reports list the volume of resource in short tons available for mining, recoverable short tons by mining method; the seam or property being mined

  17. Report on the final evaluation on the 'development of a bituminous coal liquefaction technology (NEDOL method)' in the Sunshine Project; Rekiseitan ekika gijutsu (NEDOL ho) kaihatsu saishu hyoka hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    Development of a bituminous coal liquefaction technology (NEDOL method) can be judged appropriate as a national project in the comprehensive view with the 21st century just around the corner. It is a fact that this project has spent the national budget not in a small amount. There is no prospect of the technology to be put into practical use in Japan at the present time. The coal liquefaction technology is a technology required inevitably in the situation where shortage of crude oil supply may endanger the existence of a nation. Therefore, there is sufficient significance in having demonstrated the effectiveness of the NEDOL method which can be applied to a large number of coal types and expected of high liquefaction yield. The contents of the 'technological package' to be prepared are so demanded that its usefulness can be retained until the time of a demonstration plant design and operation will come in the future. It is also desired that the human resources and the testing devices will be kept ensured, and the technologies developed under this project will be maintained and expanded. The present technology has low necessity of immediately putting into practical use in Japan at the present time. However, the technology should be kept available for use at any time, and retained for use in an urgent situation. (NEDO)

  18. Tasks in development of the USSR coal industry

    Energy Technology Data Exchange (ETDEWEB)

    Bratchenko, B F

    1981-08-01

    Minister of the Soviet coal industry evaluates social and economic development plan of the Soviet coal industry from 1981 to 1985. Planned coal production should increase to 770-800 Mt, exceeding coal production in 1980 by 53 to 83 Mt. Proportion of coal mined by surface methods will further increase. Investment program concentrates on: construction of the Kansk-Achinsk fuel and energy basin, construction of the South Yakut coal basin and further development of surface mines in the Ehkibastuz basin. Proportion of coal mined in the Kuzbass will increase to 45% of the total coal output. Construction of the Kansk-Achinsk basin has the highest priority among the investment projects. Investment projects (construction of new coal mines and modernization of existing mines) in major coal basins in 1981 are analyzed. Mining machines and equipment for underground and surface black and brown coal mining are evaluated. Plans for developing new mining systems are described (e.g. narrow web coal cutter with chainless haulage system for thin and medium coal seams with drive system with power ranging from 110 to 315 kW). The following types of machines are discussed: coal cutters, shearer loaders, heading machines, belt conveyors, loaders. Selected social problems associated with manpower shortages for underground mining and for coal mines operating under extreme climatic conditions are also discussed.

  19. Fiscal 1975 Sunshine Project. Technology assessment on coal gasification and liquefaction; 1975 nendo sekitan no gas ka ekika gijutsu no technology assessment seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-03-31

    This research was intended to find the desirable direction of technological development, by discussing the effects of coal gasification/liquefaction technologies from every angle, for the purpose coping with the social demand for steadily and continuously obtaining clean energy. This year, the examination was conducted not only on the energy conversion technologies of coal gasification/liquefaction, but also on the impact generating from the entire supply system of coal energy from coal mine development to mining, transportation, storage and conversion to secondary energy. For this purpose, while the outline was grasped of coal resources in the world as well as each technology for the mining, transportation, storage, electric power generation by gasification, and high calorie gasification, a case study was made on the assumption that electric power generation and high calorie gasification were conducted by importing 1,000 tons of coal from overseas, extracting the impact on the basis of this case study. In addition, examination was made on the position of coal energy in the energy supply of the future, with an impact investigated on condition that about 300 million tons were imported equivalent to roughly 16% of energy supply in the year 2000 or about. (NEDO)

  20. Report on the Sunshine Project in fiscal 1990. Studies on liquefaction characteristics by coal types and on engineering properties; 1990 nendo tanshu ni yoru ekika tokusei to kogakuteki busseichi ni kansuru kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-07-01

    This paper describes the achievements at the Government Industrial Development Laboratory, Hokkaido in the Sunshine Project in fiscal 1990. Surveys were carried on different catalytic activities for co-liquefaction of various types of coals. The Ru system was found preferable in acquiring fatty family products of low boiling points. Reactions of co-liquefaction constituents do not progress independently, but have positive interaction. Adding Ru is effective in accelerating hydrogenation of condensed aromatic rings and hydrogenation of cleaving nucleus, but in view of the hydrogenating decomposition capability, the Mo-system may be better. In a liquefaction plant test, diesel oil was manufactured by reforming and improving the Yallourn coal light oil. However, the oxygen content was too high, aggravating the temperature distribution control in catalyst bed, and not having achieved the intended denitrification rate. Discussions were given on co-liquefaction of the depressurization residues of Cold Lake (CLVB[vacuum bottom])/Athabasca (ATVB) and Battle River coal. The CLCVB and ATVB were turned into lower molecules easily through hydrogenation treatment. The reaction characteristics reflected the characteristics of medium oil. Depolymerization of coal has progressed faster in ATVB. In the study on the engineering property values, discussions were given on behavior of solid particles in a bubble column, and gas hold-up of slurry. (NEDO)

  1. Report on the research achievements in the Sunshine Project in fiscal 1990. Studies on coal liquefying reaction, and reforming and utilization of the products; 1990 nendo sekitan no ekika hanno to seiseibutsu no kaishitsu riyo no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1990 on research of coal liquefying reaction. The research contributes to developing a coal liquefaction technology as one of the methods for manufacturing clean energy and chemical raw materials from coal. In the fundamental study on the liquefaction, primarily liquefied heavy constituents in different types of coals were divided into such constituents as HI, TI, and THFI to discuss the performance and coking behavior of each constituent as solvent. Furthermore, effects of hydrogenation treatment were also elucidated. Decomposing reaction was performed on different heavy products to discuss effects of the reaction conditions. In the liquefying reaction using petroleum-based heavy oil as solvent, different shale oils were used in experiments for comparison with the case of using tar sand bitumen. In the study of reforming the product, comparison was carried out on reactions in hydrogenation treatment and contact decomposition of medium to heavy fractions of liquefied oil. A separation experiment was made on hetero compounds by means of solvent extraction and pressure crystallization of liquefied oil naphtha and light oil fraction. Effects of additive were investigated in an engine test on the stabilized and balanced light oil fraction. Discussions were given on high level utilization of heat treated oil recovered from residues in liquefaction distillation. (NEDO)

  2. FY 2000 report on the project for promotion of clean coal technology. Survey of zero emission coal technology; 2000 nendo clean coru technology suishin jigyo. Zero emission coru technology chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper surveyed a plan on the zero emission coal technology including up to CO2 fixation which is proposed in the U.S. and the present situation of the related study, and studied the viability of this plan including the R and D similar to this plan in Japan. Los Alamos National Laboratory in the U.S. thought of a concept of the technology to produce hydrogen from coal and recover CO2 at the same time for underground fixation, and is proceeding with the practical application. The process does not need oxygen, combustion, nor heating to be newly made. What is needed except coal is only water and lime, both of which can be recycled. The process, which discharges nothing into the air, is a closed cycle. The HyPr-RING process in Japan is a technology to decompose coal in high temperature (about 650 degrees C)/high pressure (100-200 atm) water for hydrogen formation, absorbing the formed CO2 by CaO, etc. Both of the processes have the problem, but it is necessary to make information exchanges since Japan and the U.S. devised the process at the same time. (NEDO)

  3. Conversion of metallurgical coke and coal using a Coal Direct Chemical Looping (CDCL) moving bed reactor

    International Nuclear Information System (INIS)

    Luo, Siwei; Bayham, Samuel; Zeng, Liang; McGiveron, Omar; Chung, Elena; Majumder, Ankita; Fan, Liang-Shih

    2014-01-01

    Highlights: • Accumulated more than 300 operation hours were accomplished for the moving bed reducer reactor. • Different reactor operation variables were investigated with optimal conditions identified. • High conversions of sub-bituminous coal and bituminous coal were achieved without flow problems. • Co-current and counter-current contact modes were tested and their applicability was discussed. - Abstract: The CLC process has the potential to be a transformative commercial technology for a carbon-constrained economy. The Ohio State University Coal Direct Chemical Looping (CDCL) process directly converts coal, eliminating the need for a coal gasifier oran air separation unit (ASU). Compared to other solid-fuel CLC processes, the CDCL process is unique in that it consists of a countercurrent moving bed reducer reactor. In the proposed process, coal is injected into the middle of the moving bed, whereby the coal quickly heats up and devolatilizes, splitting the reactor roughly into two sections with no axial mixing. The top section consists of gaseous fuel produced from the coal volatiles, and the bottom section consists of the coal char mixed with the oxygen carrier. A bench-scale moving bed reactor was used to study the coal conversion with CO 2 as the enhancing gas. Initial tests using metallurgical cokefines as feedstock were conducted to test the effects of operational variables in the bottom section of the moving bed reducer, e.g., reactor temperature, oxygen carrier to char ratio, enhancer gas CO 2 flow rate, and oxygen carrier flow rates. Experiments directly using coal as the feedstock were subsequently carried out based on these test results. Powder River Basin (PRB) coal and Illinois #6 coal were tested as representative sub-bituminous and bituminous coals, respectively. Nearly complete coal conversion was achieved using composite iron oxide particles as the oxygen carriers without any flow problems. The operational results demonstrated that a

  4. Coal liquefaction process streams characterization and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1992-03-01

    CONSOL R D is conducting a three-year program to characterize process and product streams from direct coal liquefaction process development projects. The program objectives are two-fold: (1) to obtain and provide appropriate samples of coal liquids for the evaluation of analytical methodology, and (2) to support ongoing DOE-sponsored coal liquefaction process development efforts. The two broad objectives have considerable overlap and together serve to provide a bridge between process development and analytical chemistry.

  5. Clean coal technology. Coal utilisation by-products

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-08-15

    The need to remove the bulk of ash contained in flue gas from coal-fired power plants coupled with increasingly strict environmental regulations in the USA result in increased generation of solid materials referred to as coal utilisation by-products, or CUBs. More than 40% of CUBs were sold or reused in the USA in 2004 compared to less than 25% in 1996. A goal of 50% utilization has been established for 2010. The American Coal Ash Association (ACCA) together with the US Department of Energy's Power Plant Improvement Initiative (PPPI) and Clean Coal Power Initiative (CCPI) sponsor a number of projects that promote CUB utilization. Several are mentioned in this report. Report sections are: Executive summary; Introduction; Where do CUBs come from?; Market analysis; DOE-sponsored CUB demonstrations; Examples of best-practice utilization of CUB materials; Factors limiting the use of CUBs; and Conclusions. 14 refs., 1 fig., 5 tabs., 14 photos.

  6. Assessment of passive safety injection systems of ALWRs. Final report of the European Commission 4th framework programme. Project FI4I-CT95-004 (APSI)

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. [VTT Energy, Espoo (Finland). Nuclear Energy; Vihavainen, J. [Lappeenranta Univ. of Technology (Finland); D' Auria, F. [Univ. of Pisa (Italy); Kimber, G. [AEA Technology (United Kingdom)

    1999-07-01

    The European Commission 4th Framework Programme project 'Assessment of Passive Safety Injection Systems of Advanced Light Water Reactors (FI4I-CT95-0004)' involved experiments on the PACTEL test facility and computer simulations of selected experiments. The experiments focused on the performance of Passive Safety Injection Systems (PSIS) of Advanced Light Water Reactors (ALWRs) in Small Break Loss-Of-Coolant Accident (SBLOCA) conditions. The PSIS consisted of a Core Make-up Tank (CMT) and two pipelines. A pressure balancing line (PBL) connected the CMT to one cold leg. The injection line (IL) connected it to the downcomer. The project involved 15 experiments in three series. The experiments provided valuable information about condensation and heat transfer processes in the CMT, thermal stratification of water in the CMT, and natural circulation flow through the PSIS lines. The experiments showed the examined PSIS works efficiently in SBLOCAs although the flow through the PSIS may stop in very small SBLOCAs, when the hot water fills the CMT. The experiments also demonstrated the importance of flow distributor (sparger) in the CMT to limit rapid condensation. The project included validation of three thermal-hydraulic computer codes (APROS, CATHARE and RELAP5). The analyses showed the codes are capable of simulating the overall behaviour of the transients. The codes predicted accurately the core heatup, which occurred when the primary coolant inventory was reduced so much that the core top became free of water. The detailed analyses of the calculation results showed that some models in the codes still need improvements. Especially, further development of models for thermal stratification, condensation and natural circulation flow with small driving forces would be necessary for accurate simulation of phenomena in the PSIS. (orig.)

  7. Assessment of passive safety injection systems of ALWRs. Final report of the European Commission 4th framework programme. Project FI4I-CT95-004 (APSI)

    International Nuclear Information System (INIS)

    Tuunanen, J.; D'Auria, F.; Kimber, G.

    1999-01-01

    The European Commission 4th Framework Programme project 'Assessment of Passive Safety Injection Systems of Advanced Light Water Reactors (FI4I-CT95-0004)' involved experiments on the PACTEL test facility and computer simulations of selected experiments. The experiments focused on the performance of Passive Safety Injection Systems (PSIS) of Advanced Light Water Reactors (ALWRs) in Small Break Loss-Of-Coolant Accident (SBLOCA) conditions. The PSIS consisted of a Core Make-up Tank (CMT) and two pipelines. A pressure balancing line (PBL) connected the CMT to one cold leg. The injection line (IL) connected it to the downcomer. The project involved 15 experiments in three series. The experiments provided valuable information about condensation and heat transfer processes in the CMT, thermal stratification of water in the CMT, and natural circulation flow through the PSIS lines. The experiments showed the examined PSIS works efficiently in SBLOCAs although the flow through the PSIS may stop in very small SBLOCAs, when the hot water fills the CMT. The experiments also demonstrated the importance of flow distributor (sparger) in the CMT to limit rapid condensation. The project included validation of three thermal-hydraulic computer codes (APROS, CATHARE and RELAP5). The analyses showed the codes are capable of simulating the overall behaviour of the transients. The codes predicted accurately the core heatup, which occurred when the primary coolant inventory was reduced so much that the core top became free of water. The detailed analyses of the calculation results showed that some models in the codes still need improvements. Especially, further development of models for thermal stratification, condensation and natural circulation flow with small driving forces would be necessary for accurate simulation of phenomena in the PSIS. (orig.)

  8. Coal Bed Methane Primer

    Energy Technology Data Exchange (ETDEWEB)

    Dan Arthur; Bruce Langhus; Jon Seekins

    2005-05-25

    During the second half of the 1990's Coal Bed Methane (CBM) production increased dramatically nationwide to represent a significant new source of income and natural gas for many independent and established producers. Matching these soaring production rates during this period was a heightened public awareness of environmental concerns. These concerns left unexplained and under-addressed have created a significant growth in public involvement generating literally thousands of unfocused project comments for various regional NEPA efforts resulting in the delayed development of public and fee lands. The accelerating interest in CBM development coupled to the growth in public involvement has prompted the conceptualization of this project for the development of a CBM Primer. The Primer is designed to serve as a summary document, which introduces and encapsulates information pertinent to the development of Coal Bed Methane (CBM), including focused discussions of coal deposits, methane as a natural formed gas, split mineral estates, development techniques, operational issues, producing methods, applicable regulatory frameworks, land and resource management, mitigation measures, preparation of project plans, data availability, Indian Trust issues and relevant environmental technologies. An important aspect of gaining access to federal, state, tribal, or fee lands involves education of a broad array of stakeholders, including land and mineral owners, regulators, conservationists, tribal governments, special interest groups, and numerous others that could be impacted by the development of coal bed methane. Perhaps the most crucial aspect of successfully developing CBM resources is stakeholder education. Currently, an inconsistent picture of CBM exists. There is a significant lack of understanding on the parts of nearly all stakeholders, including industry, government, special interest groups, and land owners. It is envisioned the Primer would being used by a variety of

  9. Chinese coal supply and future production outlooks

    International Nuclear Information System (INIS)

    Wang, Jianliang; Feng, Lianyong; Davidsson, Simon; Höök, Mikael

    2013-01-01

    China's energy supply is dominated by coal, making projections of future coal production in China important. Recent forecasts suggest that Chinese coal production may reach a peak in 2010–2039 but with widely differing peak production levels. The estimated URR (ultimately recoverable resources) influence these projections significantly, however, widely different URR-values were used due to poor understanding of the various Chinese coal classification schemes. To mitigate these shortcomings, a comprehensive investigation of this system and an analysis of the historical evaluation of resources and reporting issues are performed. A more plausible URR is derived, which indicates that many analysts underestimate volumes available for exploitation. Projections based on the updated URR using a modified curve-fitting model indicate that Chinese coal production could peak as early as 2024 at a maximum annual production of 4.1 Gt. By considering other potential constraints, it can be concluded that peak coal in China appears inevitable and immediate. This event can be expected to have significant impact on the Chinese economy, energy strategies and GHG (greenhouse gas) emissions reduction strategies. - Highlights: • Review of Chinese coal geology and resources/reserves. • Presentation of the Chinese coal classification system. • Forecasting future Chinese coal production using Hubbert curves. • Critical comparison with other forecasts. • Discussions transportation, environmental impact, water consumption, etc

  10. Prospects For Coal And Clean Coal Technologies In Kazakhstan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-12-15

    The coal sector in Kazakhstan is said to have enough reserves to last over 100 years, but the forecasted reserves are expected to last several hundreds of years. This makes investing in the fuel and energy sector of the country an attractive option for many international and private organisations. The proven on-shore reserves will ensure extraction for over 30 years for oil and 75 years for gas. The future development of the domestic oil sector depends mainly on developing the Kazakh sector of the Caspian Sea. The coal sector, while not a top priority for the Kazakh government, puts the country among the world's top ten coal-rich countries. Kazakhstan contains Central Asia's largest recoverable coal reserves. In future, the development of the raw materials base will be achieved through enriching and improving the quality of the coal and the deep processing of coal to obtain fluid fuel and synthetic substances. Developing shale is also topical. The high concentration of methane in coal layers makes it possible to extract it and utilise it on a large scale. However, today the country's energy sector, which was largely established in the Soviet times, has reached its potential. Kazakhstan has about 18 GW of installed electricity capacity, of which about 80% is coal fired, most of it built before 1990. Being alert to the impending problems, the government is planning to undertake large-scale modernisation of the existing facilities and construct new ones during 2015-30. The project to modernise the national electricity grid aims to upgrade the power substations to ensure energy efficiency and security of operation. The project will result in installation of modern high-voltage equipment, automation and relay protection facilities, a dispatch control system, monitoring and data processing and energy management systems, automated electricity metering system, as well as a digital corporate telecommunication network.

  11. FY 2000 report on the basic survey to promote Joint Implementation, etc. Project on methane gas recovery use in the Donetsk coal field/coal mine; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Donetsk tanden tanko methane gas kaishu riyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of getting petroleum substitution energy and reducing greenhouse effect gas emission, an investigational study was carried out of the project for methane gas recovery/utilization at the Donbassa coal mine in Ukraine. At the Donbassa coal mine, degassing by test boring is being conducted to reduce the gas emission at coal face for safety, but most of the gas is discharged into the air. In this project, the following were studied: degassing boring/gas induction from bore hole/measurement in gas induction pipe, gas recovery system combined with gas induction in flyash, and installation/operation of gas engine power generation facilities (1,710kW x 7 units) with exhaust heat recovery boiler using the recovered methane gas as fuel. The results obtained were the petroleum substitution amount of 31,000 toe/y and the amount of greenhouse effect gas reduction of 480,000 t/y. In the economical estimation, the initial investment amount was 3 billion yen, the profitability of the total investment used was 2.9%, and the internal earning rate was 6.5%. (NEDO)

  12. Coal pillar design procedures

    CSIR Research Space (South Africa)

    York, G

    2000-03-01

    Full Text Available Final Project Report Coal pillar design procedures G. York, I. Canbulat, B.W. Jack Research agency: CSIR Mining Technology Project number: COL 337 Date: March 2000 2 Executive Summary Examination of collapsed pillar cases outside of the empirical... in strength occurs with increasing specimen size. 45 40 35 30 25 20 15 10 5 0 20 40 60 80 100 120 140 160 UNIAX IA L COMPR EHEN SIV E S TR ENG TH (M Pa ) CUBE SIZE (cm) Figure 1...

  13. Oxy-coal Combustion Studies

    Energy Technology Data Exchange (ETDEWEB)

    Wendt, J. [Univ. of Utah, Salt Lake City, UT (United States); Eddings, E. [Univ. of Utah, Salt Lake City, UT (United States); Lighty, J. [Univ. of Utah, Salt Lake City, UT (United States); Ring, T. [Univ. of Utah, Salt Lake City, UT (United States); Smith, P. [Univ. of Utah, Salt Lake City, UT (United States); Thornock, J. [Univ. of Utah, Salt Lake City, UT (United States); Y Jia, W. Morris [Univ. of Utah, Salt Lake City, UT (United States); Pedel, J. [Univ. of Utah, Salt Lake City, UT (United States); Rezeai, D. [Univ. of Utah, Salt Lake City, UT (United States); Wang, L. [Univ. of Utah, Salt Lake City, UT (United States); Zhang, J. [Univ. of Utah, Salt Lake City, UT (United States); Kelly, K. [Univ. of Utah, Salt Lake City, UT (United States)

    2012-01-06

    The objective of this project is to move toward the development of a predictive capability with quantified uncertainty bounds for pilot-scale, single-burner, oxy-coal operation. This validation research brings together multi-scale experimental measurements and computer simulations. The combination of simulation development and validation experiments is designed to lead to predictive tools for the performance of existing air fired pulverized coal boilers that have been retrofitted to various oxy-firing configurations. In addition, this report also describes novel research results related to oxy-combustion in circulating fluidized beds. For pulverized coal combustion configurations, particular attention is focused on the effect of oxy-firing on ignition and coal-flame stability, and on the subsequent partitioning mechanisms of the ash aerosol.

  14. JV Task 126 - Mercury Control Technologies for Electric Utilities Burning Bituminous Coal

    Energy Technology Data Exchange (ETDEWEB)

    Jason Laumb; John Kay; Michael Jones; Brandon Pavlish; Nicholas Lentz; Donald McCollor; Kevin Galbreath

    2009-03-29

    The EERC developed an applied research consortium project to test cost-effective mercury (Hg) control technologies for utilities burning bituminous coals. The project goal was to test innovative Hg control technologies that have the potential to reduce Hg emissions from bituminous coal-fired power plants by {ge}90% at costs of one-half to three-quarters of current estimates for activated carbon injection (ACI). Hg control technology evaluations were performed using the EERC's combustion test facility (CTF). The CTF was fired on pulverized bituminous coals at 550,000 Btu/hr (580 MJ/hr). The CTF was configured with the following air pollution control devices (APCDs): selective catalytic reduction (SCR) unit, electrostatic precipitator (ESP), and wet flue gas desulfurization system (WFDS). The Hg control technologies investigated as part of this project included ACI (three Norit Americas, Inc., and eleven Envergex sorbents), elemental mercury (Hg{sup 0}) oxidation catalysts (i.e., the noble metals in Hitachi Zosen, Cormetech, and Hitachi SCR catalysts), sorbent enhancement additives (SEAs) (a proprietary EERC additive, trona, and limestone), and blending with a Powder River Basin (PRB) subbituminous coal. These Hg control technologies were evaluated separately, and many were also tested in combination.

  15. Coal Mines Security System

    OpenAIRE

    Ankita Guhe; Shruti Deshmukh; Bhagyashree Borekar; Apoorva Kailaswar; Milind E.Rane

    2012-01-01

    Geological circumstances of mine seem to be extremely complicated and there are many hidden troubles. Coal is wrongly lifted by the musclemen from coal stocks, coal washeries, coal transfer and loading points and also in the transport routes by malfunctioning the weighing of trucks. CIL —Coal India Ltd is under the control of mafia and a large number of irregularities can be contributed to coal mafia. An Intelligent Coal Mine Security System using data acquisition method utilizes sensor, auto...

  16. Coal at the crossroads

    International Nuclear Information System (INIS)

    Scaroni, A.W.; Davis, A.; Schobert, H.; Gordon, R.L.; Ramani, R.V.; Frantz, R.L.

    1992-01-01

    Worldwide coal reserves are very large but coal suffers from an image of being an environmentally unfriendly and inconvenient fuel. Aspects discussed in the article include: coal's poor image; techniques for coal analysis, in particular instrumented techniques; developments in clean coal technology e.g. coal liquefaction, fluidized bed combustion, co-generation and fuel slurries; the environmental impact of mining and land reclamation; and health aspects. It is considered that coal's future depends on overcoming its poor image. 6 photos

  17. Investigation cost subsidizing project for improving development of overseas coals in fiscal 1999. Investigations on improving development of Asian and Pacific coals (Investigation on production expansion of high quality coal in Shanxi Province, China); 1999 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Chugoku Shanxi sho ni okeru kohin'itan no seisan kakudai ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Evaluation was given on improvement measures to enhance quality of coal in Shanxi Province in China (Datong coal), which is exported to Japan in a large quantity. Quality problems in the Datong coal are mixture of foreign materials and quality level variation. In spite of the demands from the Japanese side, no large progress has been made in the past decade. As a result of discussions, the following improvement measures were enumerated: review on works at blast boring facings, more thorough cleaning of freight cars at the mines, exhaustive separation and recovery of plus 50 mm in coal dressing, completely mechanized boring, dressing treatment on coals purchased from other mines, whole grain size dressing treatment, establishment of the sales system of one mine selling one kind of coal, use of dedicated freight cars for Datong coal for export in railway transportation, assurance of dedicated coal storage yards in embarking ports, and improvement in the blending system at embarking ports. Understanding on quality control by highest executives at the Datong Mining Bureau and managers of each mine has been considerably deepened through the present investigation having been done over two fiscal years. As a result, the quality control mechanism was structured, the whole grain size dressing is performed, simplified dressing facilities were newly installed, and magnet separators were installed additionally. (NEDO)

  18. Investigation cost subsidizing project for improving development of overseas coals in fiscal 1999. Investigations on improving development of Asian and Pacific coals (Investigation on optimizing the coal transportation system in East Karimantan Province in Indonesia); 1999 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Indonesia Higashi Karimantan shu ni okeru sekitan yuso system saitekika chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Evaluation was given on coal production quantity and coal transportation capability in areas scheduled of future development in Karimantan, Indonesia. Discussions were given on an optimal coal transportation system in East Karimantan Province. The coal production quantity in East Karimantan in fiscal 1999 was 35.27 million tons, accounting for 48% of the total Indonesian coal production. Production of 81.90 million tons is anticipated in 2020. Quality of the coal being produced is low in ash and high in water content in general. Calorific power is 5800 kcal or more. Sulfur content is 0.5% or more, not necessarily a low sulfur coal. The result of analyzing the optimal transportation routes by using the LP model may be summarized as follows: such scenarios are regarded to be largely profitable and advantageous that assume making railways utilizable as the land transportation in addition to use of trucks, belt conveyers, and barges, expanding coal terminals at the ports of PBCT, KPC, BCT and NPLCT, and newly building ports at Tarakan, TgSengatta, BPCTH, and Mangkapadie. (NEDO)

  19. Observer-Based Fuel Control Using Oxygen Measurement. A study based on a first-principles model of a pulverized coal fired Benson Boiler

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, Palle; Bendtsen, Jan Dimon; Mortensen, Jan Henrik; Just Nielsen, Rene; Soendergaard Pedersen, Tom [Aalborg Univ. (Denmark). Dept. of Control Engineering

    2005-01-01

    This report describes an attempt to improve the existing control of coal mills used at the Danish power plant Nordjyllandsvaerket Unit 3. The coal mills pulverize raw coal to a fine-grained powder, which is injected into the furnace of the power plant. In the furnace the coal is combusted, producing heat, which is used for steam production. With better control of the coal mills, the power plant can be controlled more efficiently during load changes, thus improving the overall availability and efficiency of the plant. One of the main difficulties from a control point of view is that the coal mills are not equipped with sensors that detect how much coal is injected into the furnace. During the project, a fairly detailed, non-linear differential equation model of the furnace and the steam circuit was constructed and validated against data obtained at the plant. It was observed that this model was able to capture most of the important dynamics found in the data. Based on this model, it is possible to extract linearized models in various operating points. The report discusses this approach and illustrates how the model can be linearized and reduced to a lower-order linear model that is valid in the vicinity of an operating point by removing states that have little influence on the overall response. A viable adaptive control strategy would then be to design controllers for each of these simplified linear models, i.e., the control loop that sets references to the coal mills and feedwater, and use the load as a separate input to the control. The control gains should then be scheduled according to the load. However, the variations and uncertainties in the coal mill are not addressed directly in this approach. Another control approach was taken in this project, where a Kalman filter based on measurements of air flow blown into the furnace and the oxygen concentration in the flue gas is designed to estimate the actual coal flow injected into the furnace. With this estimate

  20. Financing of coal development in the PRC

    Energy Technology Data Exchange (ETDEWEB)

    Schofield, B J

    1984-01-01

    The financing of individual coal development projects in China is discussed. External finance can be raised from various sources including international and national aid institutions together with export credit agencies and commercial banks, or by means of a compensation trade agreement whereby the value of the coal produced meets the cost of equipment, etc.

  1. Reassessment of coal pillar design procedure

    CSIR Research Space (South Africa)

    Madden, BJ

    1995-12-01

    Full Text Available The SIMRAC project COL 021A entitled “a reassessment of coal pillar design procedures” set out to achieve a coal pillar design procedure that takes cognisance of different geological and structural factors as well as the influence...

  2. Report on the achievements in the Sunshine Project in fiscal 1986. Coal energy (Studies on coal liquefying catalysts and a liquefied oil analyzing method); 1986 nendo sekitan ekikayo shokubai oyobi ekikayu bunsekiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The present studies are intended to study catalysts that make manufacture of liquid fuel possible through coal liquefying reactions, and establish a liquefied oil analyzing method. The following items are discussed based on the achievements obtained by fiscal 1985: in the studies on coal liquefying catalysts, (1) a study on selectively liquefying catalysts, in which elucidation is made on effects of catalyst carriers on reaction selectivity and life of coal liquefying catalysts, and fundamental data are accumulated toward designing the catalysts with respect to catalyst carriers capable of selective hydrogenating reactions, and to carrying conditions; and (2) a study on solvent properties and reaction conditions. in which Mo-based catalysts are used to perform kinetic discussions on the relationship between the liquefying reaction conditions and compositions of solvents and produced oil to accumulate data for elucidating the action mechanisms of the Mo-based catalysts. In the study of the liquefied oil analyzing method, discussions are carried out on a measuring technology to expand the conventional method for liquefied oil analysis to hard-to-volatilize components. For the light and medium oils, an analyzing method will be established that utilizes effectively the NMR method and the MS method that have been established to date. (NEDO)

  3. Engineer exchanging project on coal mine technology field in fiscal 1999. International information exchanging project (the overseas workshop in Vietnam); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Technical information exchange was performed with Vietnamese engineers related to coal mine technologies through the overseas workshop and the technical tour. At the same time, investigations were executed on the production technology levels and needs in Vietnam, and on possibilities of transfer of Japanese technologies. The 'Overseas workshop (Vietnam)' was held on September 28, 1999 with the 'trends and problems in coal production technologies' as the main theme. Lectures were given in the session related to coal production technologies by Vietnamese coal technology experts, each from VINACOAL and IMSAT, and by two Japanese coal technology experts. A comprehensive discussion was also executed, and items of technical information were exchanged on the coal production technologies. The number of persons actually participated in the workshop counted 58, with the proceedings presented by them distributed. The Mao Khe and Duong Huy coal mines in Quang Ninh Province were visited as the technical tour, whereas the coal mine sites were inspected and opinions were exchanged with the site engineers. Gas analysis was performed in the Mao Khe mine from the viewpoint of a gas control technology, and site investigation was carried out on lock bolts in the Duong Huy mine from the viewpoint of a roof control technology. (NEDO)

  4. Coal in Asia-Pacific. Vo.9 No.2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This article includes `JAPAC International Symposium: Coal Flow 1997,` `Study to consolidate infrastructure to import overseas coal,` and `China`s coal-fired thermal power development plans and Japan`s subjects.` The theme of Coal Flow 1997 was `The supply and demand of coal up to 2020 - Its outlook and related issues.` The main subject for discussion was `a review of the long-term outlook for coal supply and demand from now into the year 2020 in coal producing and consuming members of the Asia-Pacific community, of which economic growth rate is expected to continue.` For the study to consolidate infrastructure to import overseas coal, subjects for stable Australian coal supply under environmental constraints are outlined. Coal resources and reserves in Australia, Australia`s coal supply capabilities, and export markets for Australian coal and its supply capabilities to Japan are discussed. For China`s coal-fired thermal power development plans and Japan`s subjects, subjects of coal-fired thermal power, coal-fired thermal power development plans and foreign-funded projects, and Japan`s cooperation and subjects are outlined. 26 figs., 26 tabs.

  5. Coal industry annual 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    Coal Industry Annual 1997 provides comprehensive information about US coal production, number of mines, prices, productivity, employment, productive capacity, and recoverable reserves. US Coal production for 1997 and previous years is based on the annual survey EIA-7A, Coal Production Report. This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report includes a national total coal consumption for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. 14 figs., 145 tabs.

  6. Coal industry annual 1997

    International Nuclear Information System (INIS)

    1998-12-01

    Coal Industry Annual 1997 provides comprehensive information about US coal production, number of mines, prices, productivity, employment, productive capacity, and recoverable reserves. US Coal production for 1997 and previous years is based on the annual survey EIA-7A, Coal Production Report. This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report includes a national total coal consumption for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. 14 figs., 145 tabs

  7. Testosterone Injection

    Science.gov (United States)

    ... typical male characteristics. Testosterone injection works by supplying synthetic testosterone to replace the testosterone that is normally ... as a pellet to be injected under the skin.Testosterone injection may control your symptoms but will ...

  8. Coal marketing manual 1987

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    This manual provides information on the international coal market in tabulated format. Statistics are presented for the Australian coal industry, exports, currency movements, world coal production, coal and coke imports and exports. Detailed information is provided on the Australian coal industry including mine specific summaries. Pricing summaries for thermal and coking coal in 1987, coal quality standards and specifications, trends in coal prices and stocks. Imports and exports for World coal and coke, details of shipping, international ports and iron and steel production. An exporters index of Australian and overseas companies with industry and government contacts is included. 15 figs., 67 tabs.

  9. Coal industry annual 1996

    International Nuclear Information System (INIS)

    1997-11-01

    This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality, and emissions for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States.This report does not include coal consumption data for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. Consumption for nonutility power producers not included in this report is estimated to be 24 million short tons for 1996. 14 figs., 145 tabs

  10. Coal industry annual 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality, and emissions for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States.This report does not include coal consumption data for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. Consumption for nonutility power producers not included in this report is estimated to be 24 million short tons for 1996. 14 figs., 145 tabs.

  11. Coal Industry Annual 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. Consumption for nonutility power producers not included in this report is estimated to be 21 million short tons for 1995.

  12. Coal Industry Annual 1995

    International Nuclear Information System (INIS)

    1996-10-01

    This report presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. Consumption for nonutility power producers not included in this report is estimated to be 21 million short tons for 1995

  13. Microbial reactions in coal and coal relevant structures. Part project: fungal and enzymatic depolarisation of brown coal for the production of low-molecular compounds. Interim report; Mikrobielle Umsetzung an Kohle und kohlenrelevanten Strukturen. Teilvorhaben: Pilzliche und enzymatische Depolymerisation von Braunkohle zur Gewinnung niedermolekularer Verbindungen. Zwischenbericht (Berichtszeitraum 01.01.1998 - 31.12.1998)

    Energy Technology Data Exchange (ETDEWEB)

    Ziegenhagen, D.; Bublitz, F.; Sorge, S.; Ullrich, R.; Hofrichter, M.; Fritsche, W.

    1999-04-29

    The present research project involved a study of the depolymerisation of brown coal constituents. The purpose of the depolymerisation experiments, which were carried out with fungi as well as their (acellular) enzymes, was to obtain products with a potential market value. Research focussed on one of the key enzymes of lignocellulose degradation, namely manganese (II) peroxidase (MnP). The effects of this enzyme on the depolymerisation of brown coal was studied in detail in acellular systems. The insights gained in this way then served as a basis for optimising the fungal and enzymatic depolymerisation processes for maximum yields of low-molecular products. The experiments carried out during the period under review were oriented to finding new types of lignolytically active organisms, isolating lignolytic enzymes and immobilising them on natural support materials, and further examining the action spectrum of MnP. Different model substrates were used in order to gain information on what bond types are MnP-cleavable and on possible reaction products. Substrates were either fixed to silica gel as support material or used without support material. The idea of using substrates fixed to support materials was motivated by the need to distinguish between intracellular and extracellular reactions involving the fungal mycelium. [Deutsch] Im Rahmen des Forschungsvorhabens wird die Depolymerisation von Braunkohle-Bestandteilen untersucht. Ziel der sowohl mit Pilzorganismen als auch mit deren Enzymen (zellfrei) durchgefuehrten Depolymerisationsversuche ist die Gewinnung von Produkten mit potentiellem Werkstoffcharakter. Im Mittelpunkt der Forschung steht eines der Schluesselenzyme des Ligninozellulose-Abbaus: Die Mangan(II)-Peroxidase (MnP). Die Wirkung dieses Enzyms bei der Depolymerisation von Braunkohle (Bk) in zellfreien Systemen wird weitergehend untersucht. Auf Grundlage der gewonnenen Erkenntnisse werden die pilzlichen und enzymatischen Depolymerisationsprozesse so

  14. Coal and recycling mark the way forward

    Energy Technology Data Exchange (ETDEWEB)

    Bignell, E.

    2000-11-01

    A report is given of this year's Mineral Engineering Society's annual conference held in Scarborough, UK. The themes of recycling and coal were chosen for the two days of technical presentations. Topics included the cleaning up of brown field sites; the use of recycled waste oxide to replace iron ore pellets for cooling furnaces in steel making; high pressure filtration of industrial mineral effluent; iron ore mining in Australia; screen development; the status of coal preparation technology, by RJB Mining; study of movement of material (to simulate coal) in a hopper; and a UK-Chinese project on reduction of sulphur in coal.

  15. Coal could quadruple by 2000. [Canada

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    The federal and most provincial governments are encouraging coal as an energy source. Coal production will increase 4-5 times by 2000 and world trade double with further increases to 2025. The Canadian steel industry is producing near capacity and forecasts a growth rate of 4% over the next ten years. Problems facing Canadian steel industry include the E1k River project, St. Lawrence toll increases, environmental coal requirements, and Chinese crude steel. Coal industry should have an excellent future if the Canadian governments can fill their leadership roles.

  16. In-seam seismics for coal

    Energy Technology Data Exchange (ETDEWEB)

    Saviron Cidon, L [OCICARBON, Madrid (Spain)

    1989-11-01

    The project objective is to assess the degree of applicability of in-seam seismic technology in Spanish coal mines for use as a tool to predict the presence of irregularities in coal seams. By the very nature of coal mining, a large number of in-seam seismic research results are put directly to the test by the ensuing underground operations. The statistics from this continuous process of verification in other countries show this method to be extremely successful. Indeed, the use of the method has become habitual and it is recognised as an efficient instrument for aiding the location of faults and other irregularities in coal seams. 3 figs., 2 tabs.

  17. Coal and Energy.

    Science.gov (United States)

    Bryant, Reba; And Others

    This teaching unit explores coal as an energy resource. Goals, student objectives, background information, and activity options are presented for each major section. The sections are: (1) an introduction to coal (which describes how and where coal was formed and explains the types of coal); (2) the mining of coal (including the methods and ways of…

  18. Innovative Clean Coal Technology (ICCT): Demonstration of selective catalytic reduction (SCR) technology for the control of nitrogen oxide (NO{sub x}) emissions from high-sulfur coal-fired boilers. Technical progress report, third and fourth quarters 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The objective of this project is to demonstrate and evaluate commercially available selective catalytic reduction (SCR) catalysts from U.S., Japanese, and European catalyst suppliers on a high-sulfur U.S. Coal-fired boiler. SCR is a post-combustion nitrogen oxide (NO{sub x}) control technology that involves injecting ammonia into the flue gas generated from coal combustion in an electric utility boiler. The flue gas containing ammonia is then passed through a reactor that contains a specialized catalyst. In the presence of the catalyst, the ammonia reacts with NO{sub x} to form nitrogen and water vapor. Although SCR is widely practiced in Japan and European gas-, oil-, and low-sulfur coal-fired boilers, there are several technical uncertainties associated with applying SCR to U.S. coals. These uncertainties include: (1) potential catalyst deactivation due to poisoning by trace metal species present in U.S. coals that are not present in other fuels; (2) performance of the technology and effects on the balance-of-plant equipment in the presence of high amounts of SO{sub 2} and SO{sub 3}; performance of a wide variety of SCR catalyst compositions, geometries, and methods of manufacture under typical high-sulfur coal-fired utility operating conditions. These uncertainties are being explored by operating a series of small- scale SCR reactors and simultaneously exposing different SCR catalysts to flue gas derived from the combustion of high sulfur U.S. coal. The demonstration is being performed at Gulf Power Company`s Plant Crist Unit No. 5 (75 MW capacity) near Pensacola, Florida. The project is funded by the U.S. Department of Energy (DOE), Southern Company Services, Inc. (SCS on behalf of the entire Southern electric system), the Electric Power Research Institute (EPRI), and Ontario Hydro. SCS is the participant responsible for managing al aspects of this project. 1 ref., 69 figs., 45 tabs.

  19. Report on the FY 1998 results of the New Sunshine Project (B version). Development of coal liquefaction technology (Development of base technology of liquefaction (Project on internationalization of coal liquefaction technology)); 1998 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B ban). Ekika kiban gijutsu no kaihatsu (sekitan ekika gijutsu no kokusaika jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In 1994, a memorandum on the research cooperation was agreed between NEDO and BPPT (The Agency for the Assessment and Application Technology) in Indonesia, based on the request for the coal liquefaction technology cooperation from BPPT. It includes the following items: conference for professionals to be held, invitation and training of Indonesian engineers, activity for joint field survey and potential survey of location of coal liquefaction commercial plant. Further in 1997, the secondary memorandum was concluded for the potential survey for securing the hydrogen required for coal liquefaction by coal gasification. The survey was summarized as the potential survey for location of coal liquefaction. In the testing study for improving economical efficiency of liquefaction process, it was made clear that the higher the Fe content of Banko coal is, the higher the reaction of liquefaction is, and that Fe compounds in coal show catalysis. In the Soroako area in Sulawesi island, there are the nickel mine run by PT. Inco. Soroako limonite is promising as catalyst material for commercial-scale coal liquefaction. In the gasification method, the plant construction cost increases, but the production amount of coal-derived liquid can be increased. That is more profitable than the production of hydrogen from natural gas. (NEDO)

  20. Low-ph injection grout for deep repositories. Summary report from a co-operation project between NUMO (Japan), Posiva (Finland) and SKB (Sweden)

    Energy Technology Data Exchange (ETDEWEB)

    Boden, A. (ed.) [SwedPower Ab, Stockholm (Sweden); Sievaenen, U. (ed.) [JP-Suoraplan Oy, Vantaa (Finland)

    2006-02-15

    This report summarises results achieved in the joint SKB, Posiva and NUMO project 'Injection grout for deep repositories'. The work has been carried out in four subprojects with SKB and Posiva as responsible for two sub-projects each. This report summarises the original reporting. Posiva was responsible for the studies on low-pH cementitious grout, while SKB was responsible for the studies on non-cementitious grout. The work was done by literature surveys, laboratory analyses and field tests A result of the project is that there are both low-pH cementitious material for grouting larger fractures ((>-) 100 {mu}m) and non-cementitious material for grouting smaller fractures ((<-) 100 {mu}m) that will, after further optimisation work, be recommended for grouting of deep repositories. This project concentrated on the technical development of properties for the low pH grouts. Long-term safety and environmental aspects and durability of materials were preliminarily considered. Continued evaluations have to be carried out. (orig.)

  1. Novel Fuel Cells for Coal Based Systems

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Tao

    2011-12-31

    The goal of this project was to acquire experimental data required to assess the feasibility of a Direct Coal power plant based upon an Electrochemical Looping (ECL) of Liquid Tin Anode Solid Oxide Fuel Cell (LTA-SOFC). The objective of Phase 1 was to experimentally characterize the interaction between the tin anode, coal fuel and cell component electrolyte, the fate of coal contaminants in a molten tin reactor (via chemistry) and their impact upon the YSZ electrolyte (via electrochemistry). The results of this work will provided the basis for further study in Phase 2. The objective of Phase 2 was to extend the study of coal impurities impact on fuel cell components other than electrolyte, more specifically to the anode current collector which is made of an electrically conducting ceramic jacket and broad based coal tin reduction. This work provided a basic proof-of-concept feasibility demonstration of the direct coal concept.

  2. Clean Coal Technology Programs: Program Update 2009

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-10-01

    The purpose of the Clean Coal Technology Programs: Program Update 2009 is to provide an updated status of the U.S. Department of Energy (DOE) commercial-scale demonstrations of clean coal technologies (CCT). These demonstrations have been performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII), and the Clean Coal Power Initiative (CCPI). Program Update 2009 provides: (1) a discussion of the role of clean coal technology demonstrations in improving the nation’s energy security and reliability, while protecting the environment using the nation’s most abundant energy resource—coal; (2) a summary of the funding and costs of the demonstrations; and (3) an overview of the technologies being demonstrated, along with fact sheets for projects that are active, recently completed, or recently discontinued.

  3. Effects of calcium magnesium acetate on the combustion of coal-water slurries. Final project report, 1 September 1989--28 February 1993

    Energy Technology Data Exchange (ETDEWEB)

    Levendis, Y.A.; Wise, D.; Metghalchi, H.; Cumper, J.; Atal, A.; Estrada, K.R.; Murphy, B.; Steciak, J.; Hottel, H.C.; Simons, G.

    1993-07-01

    To conduct studies on the combustion of coal water fuels (CWFs) an appropriate facility was designed and constructed. The main components were (1) a high-temperature isothermal laminar flow furnace that facilitates observation of combustion events in its interior. The design of this system and its characterization are described in Chapter 1. (2) Apparatus for slurry droplet/agglomerate particle generation and introduction in the furnace. These devices are described in Chapters 1 and 3 and other attached publications. (3) An electronic optical pyrometer whose design, construction theory of operation, calibration and performance are presented in Chapter 2. (4) A multitude of other accessories, such as particle fluidization devices, a suction thermometer, a velocimeter, high speed photographic equipment, calibration devices for the pyrometer, etc., are described throughout this report. Results on the combustion of CWF droplets and CWF agglomerates made from micronized coal are described in Chapter 3. In the same chapter the combustion of CWF containing dissolved calcium magnesium acetate (CMA) axe described. The combustion behavior of pre-dried CWF agglomerates of pulverized grain coal is contrasted to that of agglomerates of micronized coal in Chapter 4. In the same chapter the combustion of agglomerates of carbon black and diesel soot is discussed as well. The effect of CMA on the combustion of the above materials is also discussed. Finally, the sulfur capture capability of CMA impregnated micronized and pulverized bituminous coals is examined in Chapter 5.

  4. Retort for distilling coal oil

    Energy Technology Data Exchange (ETDEWEB)

    Gibbon, J

    1865-12-20

    The construction of a retort for extracting or distilling coal oil or other products from cannel coal, shale, or schist, and more particularly of small coal or dust technically called slack, consists in applying self-acting feed and discharge apparatus to a revolving cylindrical wrought or cast iron retort, and constructing the inner surface of the cylindrical retort with a projecting ridge which encircles the interior of the retort in a spiral manner, the same as the interior of a female screw, and the ridge may be either cast upon or riveted on the internal surface, and is so arranged to cause the material to be operated upon to advance from one end of the retort to the other, as the retort revolves by following the course of the spiral screw or worm formed by the projecting ridge.

  5. Coal -94

    International Nuclear Information System (INIS)

    Sparre, C.

    1994-05-01

    This report deals with use of coal and coke during 1993; information about techniques, environmental questions and markets are also given. Use of steamcoal for heating purposes has been reduced about 3 % during 1993 to 1,0 mill tons. This is the case especially for the heat generating boilers. Production in co-generation plants has been constant and has increased for electricity production. Minor plants have increased their use of forest fuels, LPG and NG. Use of steamcoal will probably go down in the immediate years both in heat generating and co-generating plants. Coal-based electricity has been imported from Denmark during 1993 corresponding to about 400 000 tons of coal, when several of our nuclear plants were stopped. Use of steamcoal in the industry has been constant at 700 000 tons. This level is supposed to be constant or to vary with business cycles. The import of metallurgical coal in 1993 was 1,6 mill tons like the year before. 1,2 mill tons coke were produced. Coke consumption in industry was 1,4 mill tons. 0,2 mill tons of coke were imported. Average price of steamcoal imported to Sweden in 1993 was 308 SEK/ton or 13 % higher than in 1992; this can be explained by the dollar price level increasing 34% in 1993. For the world, the average import price was 50,0 USD/ton, a decrease of 6 %. The coal market during 1993 was affected by less consumption in Europe, shut downs of European mines and decreasing prices. High freight price raises in Russia has affected the Russian export and the market in northern Europe. The prices have been stabilized recently. All Swedish plants meet emission limits of dust, SO 2 and NO x . Co-generation plants all have some sort of SO 2 -removal system; the wet-dry method is mostly used. A positive effect of the recently introduced NO x -duties is a 40% reduction

  6. Oxidation and carbonisation of coals: a case study of coal fire affected coals from the Wuda coalfield, Inner Mongolia, China

    Science.gov (United States)

    Kus, Jolanta; Meyer, Uwe; Ma, Jianwei; Chen-Brauchler, Dai

    2010-05-01

    At the coalfield of Wuda (Inner Mongolia, PR China) extensive underground coal fires cause widespread thermal and oxidative effects in coal seams. Within phase B of the Coal Fire Research Project of the Sino-German Initiative, methods for innovative fire-extinguishing technologies were investigated in multifaceted research approaches. Extensive investigations of oxidative and thermally affected coal seams in coal fire zone 18 were conducted in 2008 prior to application of new fire-extinguishing methods. We present results from the outcrop of coal seam No. 4 in the fire zone 18. The coal of seam No. 4 is of Early Permian age and belongs stratigraphically to the Shanxi Formation. The unaffected coal displays a high volatile bituminous A rank with a background value of random vitrinite reflectance ranging from 0.90 to 0.96 % Rr. Coal channel samples were coallected at actively extracted coal faces along multiple profiles with surface temperatures ranging from about 50° to 600°C. Microscopic examinations revealed a variety of products of coal exposure to the fire. Within coal samples, a marked rise in vitrinite reflectance from background values to 5.55% Rr (6.00 % Rmax) is encountered. In addition, a number of coal samples showed suppressed vitrinite reflectances ranging between 0.82 to 0.88% Rr. Further, seemingly heat unaffected coal samples display intensive development of oxidations rims at coal grain edges and cracks as well as shrinkage cracks and formation of iron oxides/hydroxides. Instead, thermally affected coal samples with higher coalification grade are further characterised by development of macropores (devolatilisation pores) in vitrinitic streaks, transformation of liptinite to meta-liptinite and micrinite as well as by natural coke particles of mostly porous nature and fine to coarse grained anisotropic mosaic. Coal petrographic investigations confirmed a hypothesis that both, oxidations as well as low temperature carbonisation govern the thermal

  7. Fiscal 1999 international engineer exchange project (Coal mining technology field). Overseas workshop (Australia); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Goshu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the technology exchange with Australian coal mining engineers, the technical levels and needs on coal production, safety and environment in Australia, and the FS result on transfer of Japanese technologies, engineer exchange and joint research in a coal mining technology field. The overseas workshop (Australia) was held on Nov. 9, 1999 (Tues.) in Brisbane, Queensland. The Australia-Japan Technology Exchange Workshop on coal resources and coal mining technology includes 5 sessions (keynote address, trends and issues of coal resource development, coal resources and production technology, coal resources and safety technology, coal resources and environmental problems), and the open forum discussion on innovative technologies for coal mining. 6 Japanese specialists and 11 Australian specialists read papers. After the workshop, the participants visited Liddell Mine in New South Wales to master natural conditions, and production and safety technology levels of Australian coal mines, and to exchange various information with Australian coal mining engineers. (NEDO)

  8. Coal: the dinosaur wakes up; Charbon: le dinosaure se reveille

    Energy Technology Data Exchange (ETDEWEB)

    Rousseau, Y.; Cosnard, D

    2005-10-01

    In western countries, coal is considered as an industry of the past, but at the Earth's scale the situation is radically the opposite. Since three years, coal is the faster developing energy source, in particular thanks to China expansion and to the oil crisis which makes coal more competitive. This short paper presents the situation of coal mining in China: projects, working conditions and environmental impact. (J.S.)

  9. Sequestration and Enhanced Coal Bed Methane: Tanquary Farms Test Site, Wabash County, Illinois

    Energy Technology Data Exchange (ETDEWEB)

    Frailey, Scott; Parris, Thomas; Damico, James; Okwen, Roland; McKaskle, Ray; Monson, Charles; Goodwin, Jonathan; Beck, E; Berger, Peter; Butsch, Robert; Garner, Damon; Grube, John; Hackley, Keith; Hinton, Jessica; Iranmanesh, Abbas; Korose, Christopher; Mehnert, Edward; Monson, Charles; Roy, William; Sargent, Steven; Wimmer, Bracken

    2012-05-01

    The Midwest Geological Sequestration Consortium (MGSC) carried out a pilot project to test storage of carbon dioxide (CO{sub 2}) in the Springfield Coal Member of the Carbondale Formation (Pennsylvanian System), in order to gauge the potential for large-scale CO{sub 2} sequestration and/or enhanced coal bed methane recovery from Illinois Basin coal beds. The pilot was conducted at the Tanquary Farms site in Wabash County, southeastern Illinois. A four-well design an injection well and three monitoring wells was developed and implemented, based on numerical modeling and permeability estimates from literature and field data. Coal cores were taken during the drilling process and were characterized in detail in the lab. Adsorption isotherms indicated that at least three molecules of CO{sub 2} can be stored for each displaced methane (CH{sub 4}) molecule. Microporosity contributes significantly to total porosity. Coal characteristics that affect sequestration potential vary laterally between wells at the site and vertically within a given seam, highlighting the importance of thorough characterization of injection site coals to best predict CO{sub 2} storage capacity. Injection of CO{sub 2} gas took place from June 25, 2008, to January 13, 2009. A continuous injection period ran from July 21, 2008, to December 23, 2008, but injection was suspended several times during this period due to equipment failures and other interruptions. Injection equipment and procedures were adjusted in response to these problems. Approximately 92.3 tonnes (101.7 tons) of CO{sub 2} were injected over the duration of the project, at an average rate of 0.93 tonne (1.02 tons) per day, and a mode injection rate of 0.6-0.7 tonne/day (0.66-0.77 ton/day). A Monitoring, Verification, and Accounting (MVA) program was set up to detect CO{sub 2 leakage. Atmospheric CO{sub 2} levels were monitored as were indirect indicators of CO{sub 2} leakage such as plant stress, changes in gas composition at

  10. Clean Coal Technology Programs: Program Update 2003 (Volume 1)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  11. Fiscal 1998 overseas geological structure survey. Japan-China joint coal survey Mei-Xian project; 1998 nendo kaigai chishitsu kozo nado chosa hokokusho. Nippon Chugoku sekitan kyodo tansa Mei-Xian project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Japan-China joint coal survey was made through seismic prospecting by Japanese group and drilling prospecting by Chinese group. Mei-Xian mine property includes coal seams of the Jurassic period, and is covered with the quaternary period stratum without any coal seam. The base of the quaternary period stratum exists at depth of 50-400m, while the coal seams at depth of 300-700m. Among 11 existing seams, the 1st and 5th seams are main objects for prospecting. The 5th seam of 0.2-8.96m (2.95m in average) thick is the most expected important one, distributing all over the mine property. The 5th seam also has branch seams spreading over 2.5km from east to west and 1.2km from south to north in the center part of the mine property. The 1st seam of 0-8.62m (2.90m in average) thick is most thick in the south part of the mine property. The theoretical amount of coal deposits in the whole coal seam is estimated to be nearly 290,000,000t by Chinese group (nearly 50% of it in the 5th seam). That is also estimated to be nearly 346,000,000t by Japanese group (155,000,000t in the 5th seam). Both 1st and 5th seams are composed of sub-bituminous coal. (NEDO)

  12. Coal statistics 1977

    Energy Technology Data Exchange (ETDEWEB)

    Statistical Office of the European Communities

    1978-01-01

    Presents tables of data relating to the coal market in the European Community in 1977. The tables cover hard coal production, supply and trade; briquettes; cokes; lignite, brown coal briquettes and peat; and mines and coke ovens.

  13. Australian coal yearbook 1989

    Energy Technology Data Exchange (ETDEWEB)

    Aylward, A [ed.

    1989-01-01

    This yearbook contains a mine directory; details of coal export facilities and ports; annual coal statistics; a buyers' guide; names and addresses of industry organisations and an index of coal mine owners.

  14. Coal industry annual 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-06

    Coal Industry Annual 1993 replaces the publication Coal Production (DOE/FIA-0125). This report presents additional tables and expanded versions of tables previously presented in Coal Production, including production, number of mines, Productivity, employment, productive capacity, and recoverable reserves. This report also presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for a wide audience including the Congress, Federal and State agencies, the coal industry, and the general public. In addition, Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility Power Producers who are not in the manufacturing, agriculture, mining, construction, or commercial sectors. This consumption is estimated to be 5 million short tons in 1993.

  15. Coal industry annual 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Coal Industry Annual 1993 replaces the publication Coal Production (DOE/FIA-0125). This report presents additional tables and expanded versions of tables previously presented in Coal Production, including production, number of mines, Productivity, employment, productive capacity, and recoverable reserves. This report also presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for a wide audience including the Congress, Federal and State agencies, the coal industry, and the general public. In addition, Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility Power Producers who are not in the manufacturing, agriculture, mining, construction, or commercial sectors. This consumption is estimated to be 5 million short tons in 1993

  16. Australian black coal statistics 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This second edition of Australian black coal statistics replaces the Joint Coal Board's publication 'Black coal in Australia'. It includes an expanded international coal trade supplement. Sections cover resources of black coal, coal supply and demand, coal production, employment and productivity of mines, export data, coal consumption and a directory of producers.

  17. Preliminary experimental studies of waste coal gasification

    Energy Technology Data Exchange (ETDEWEB)

    Su, S.; Jin, Y.G.; Yu, X.X.; Worrall, R. [CSIRO, Brisbane, QLD (Australia). Advanced Coal Technology

    2013-07-01

    Coal mining is one of Australia's most important industries. It was estimated that coal washery rejects from black coal mining was approximately 1.82 billion tonnes from 1960 to 2009 in Australia, and is projected to produce another one billion tonnes by 2018 at the current production rate. To ensure sustainability of the Australian coal industry, we have explored a new potential pathway to create value from the coal waste through production of liquid fuels or power generation using produced syngas from waste coal gasification. Consequently, environmental and community impacts of the solid waste could be minimized. However, the development of an effective waste coal gasification process is a key to the new pathway. An Australian mine site with a large reserve of waste coal was selected for the study, where raw waste coal samples including coarse rejects and tailings were collected. After investigating the initial raw waste coal samples, float/sink testing was conducted to achieve a desired ash target for laboratory-scale steam gasification testing and performance evaluation. The preliminary gasification test results show that carbon conversions of waste coal gradually increase as the reaction proceeds, which indicates that waste coal can be gasified by a steam gasification process. However, the carbon conversion rates are relatively low, only reaching to 20-30%. Furthermore, the reactivity of waste coal samples with a variety of ash contents under N{sub 2}/air atmosphere have been studied by a home-made thermogravimetric analysis (TGA) apparatus that can make the sample reach the reaction temperature instantly.

  18. Comparison of the Wymark CO2 Reservoir with the Midale Beds at the Weyburn CO2 Injection Project

    International Nuclear Information System (INIS)

    Ryerson, F.; Johnson, J.

    2010-01-01

    The Devonian carbonates of the Duperow Formation on the western flank of the Williston Basin in southwest Saskatchewan contain natural accumulations of CO 2 , and may have done so for as long as 50 m.y. in the views of some investigations. These carbonate sediments are characterized by a succession of carbonate cycles capped by anhydrite-rich evaporites that are thought to act as seals to fluid migration. The Weyburn CO 2 injection site lies 400 km to the east in a series of Mississippian carbonates that were deposited in a similar depositional environment. That natural CO 2 can be stored long-term within carbonate strata has motivated the investigation of the Duperow rocks as a potential natural analogue to storage of anthropogenic CO 2 that may ultimately provide additional confidence for CO 2 sequestration in carbonate lithologies. For the Duperow strata to represent a legitimate analog for Midale injection and storage, the similarity in lithofacies, whole rock compositions, mineral compositions and porosity with the Midale Beds must be established. Previous workers have demonstrated the similarity of the lithofacies at both sites. Here we compare the whole rock compositions, mineralogy and mineral compositions. The major mineral phases at both locales are calcite, dolomite and anhydrite. In addition, accessory pyrite, fluorite and celestine are also observed. The distribution of porosity in the Midale Vuggy units is virtually identical to that of the Duperow Formation, but the Marly units of the Midale have significantly higher porosity. The Duperow Formation is topped by the Dinesmore evaporite that is particularly rich in anhydrite, and often contains authigenic K-feldspar. The chemistry of dolomite and calcite from the two localities also overlaps. Silicate minerals are in low abundance within the analyzed Duperow samples, < 3 wt% on a normative basis, with quartz the only phase identifiable in x-ray diffraction patterns. The Midale Beds contain

  19. Differential behavioral profile induced by the injection of dipotassium chlorazepate within brain areas that project to the nucleus accumbens septi.

    OpenAIRE

    Llano López, Luis H.; Caif, Fernando; Fraile, Miriam; Tinnirello, Belén; Landa-Gargiulo, Adriana I.; Lafuente, José V.; Baiardi, Gustavo Carlos; Gargiulo, Pascual Angel

    2015-01-01

    The effect of the agonism on g-aminobutyric acid (GABA) receptors was studied within medial prefrontal cortex (mPFC), amygdala (AMY) and ventral hipocampus (VH) in the plus-maze test in male rats bilaterally cannulated. These structures send glutamatergic projections to the nucleus accumbens septi (NAS), in which interaction and integration between these afferent pathways has been described. In a previous study of our group, blockade of glutamatergic transmission within NAS induced an anxioly...

  20. MERCURY CONTROL IN MUNICIPAL WASTE COMBUSTORS AND COAL-FIRED UTILITIES

    Science.gov (United States)

    Control of mercury (Hg) emissions from municipal waste combustors (MWCs) and coal-fired utilities has attracted attention due to current and potential regulations. Among several techniques evaluated for Hg control, dry sorbent injection (primarily injection of activated carbon) h...

  1. Shahejie-Shahejie/Guantao/Wumishan and Carboniferous/Permian Coal-Paleozoic Total Petroleum Systems in the Bohaiwan Basin, China (based on geologic studies for the 2000 World Energy Assessment Project of the U.S. Geological Survey)

    Science.gov (United States)

    Ryder, Robert T.; Qiang, Jin; McCabe, Peter J.; Nuccio, Vito F.; Persits, Felix

    2012-01-01

    This report discusses the geologic framework and petroleum geology used to assess undiscovered petroleum resources in the Bohaiwan basin province for the 2000 World Energy Assessment Project of the U.S. Geological Survey. The Bohaiwan basin in northeastern China is the largest petroleum-producing region in China. Two total petroleum systems have been identified in the basin. The first, the Shahejie&ndashShahejie/Guantao/Wumishan Total Petroleum System, involves oil and gas generated from mature pods of lacustrine source rock that are associated with six major rift-controlled subbasins. Two assessment units are defined in this total petroleum system: (1) a Tertiary lacustrine assessment unit consisting of sandstone reservoirs interbedded with lacustrine shale source rocks, and (2) a pre-Tertiary buried hills assessment unit consisting of carbonate reservoirs that are overlain unconformably by Tertiary lacustrine shale source rocks. The second total petroleum system identified in the Bohaiwan basin is the Carboniferous/Permian Coal–Paleozoic Total Petroleum System, a hypothetical total petroleum system involving natural gas generated from multiple pods of thermally mature coal beds. Low-permeability Permian sandstones and possibly Carboniferous coal beds are the reservoir rocks. Most of the natural gas is inferred to be trapped in continuous accumulations near the center of the subbasins. This total petroleum system is largely unexplored and has good potential for undiscovered gas accumulations. One assessment unit, coal-sourced gas, is defined in this total petroleum system.

  2. Report on the achievements in the Sunshine Project in fiscal 1986. Surveys on systems to structure a coal liquefaction database; 1986 nendo sekitan ekika database kochiku no tame no system chosa seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    Surveys are carried out on the current status of information control systems for development projects being performed or planned in developing coal liquefaction technologies. The conception for structuring a coal liquefaction database (CLDB) is made clear to manage comprehensively and utilize effectively the information in the systems. Section 3 investigated and analyzed the current status of data processing for experimental plants. The data for each experimental plant are processed individually. Therefore, it is preferable that the CLDB shall be provided with accommodating locations to receive respective data. Section 4 put into order the flows of operation and information in the coal liquefaction research, and depicted an overall configuration diagram for the system. Section 5 discusses problems in structuring this system. There is a large number of problems to be discussed from now on, not only in the technological aspect, but in analyzing the organizational roles of NEDO and commissioned business entities, and the needs of users. The last section summarizes the steps and schedule for developing this system. The development steps should preferably be implemented stepwise along the progress of the experimental plants, in such an order as the fundamental database, analysis database and engineering database. (NEDO)

  3. Externalities of fuel cycles 'ExternE' project. Coal fuel cycle. Estimation of physical impacts and monetary valuation for priority impact pathways

    International Nuclear Information System (INIS)

    Berry, J.E.; Holland, M.R.; Watkiss, P.R.

    1994-01-01

    agreement on a variety of methodological issues was reached on both sides of the Atlantic. Since 1993 the study has continued in Europe as the ExternE-Project, and now involves an international team of more than 30 organisations. The current study has 4 principal objectives; 1) To design a unified methodology for quantifying the various social costs associated with the production and consumption of energy. 2) To produce a framework to account for the external costs that result from incremental use of different fuels. 3) To use the methodology in an international comparative analysis. 4) To identify critical methodological issues and research requirements. At the same time as the publication of the present report, further reports are being published on the other major fuel cycles for electricity generation, including uranium, lignite, oil, gas, wind and biomass. In addition a further volume, providing greater detail on the methodology used for assessment of the fossil fuel cycles will also be published shortly. This document assesses the progress made in quantifying environmental and health damages associated with the coal fuel cycle. Estimates of impacts have been made following critical review of existing data and models rather than from original basic research. This review has been performed by a multi-disciplinary team including specialists in the fields of health, forestry, ecology, materials science, atmospheric chemistry and physics, energy technology, computer science and economics

  4. 1982 Australian coal conference papers

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    This third Australian coal conference included papers discussing the market for coal, finance and investment, use of computers, mining, coal research, coal preparation and waste disposal, marketing and trade, and the transport of coal. All papers have been individually abstracted.

  5. Energy strategy would slow coal's growth, says DOE

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The National Energy Strategy (NES) recently announced by the Bush Administration would slow the growth in use of coal by hundreds of millions of tons of coal by hundreds of millions of tons after 2000, according to the Department of Energy's (DOE) own figures. If today's policies are continued, coal consumption will nearly triple by 2030. Current annual consumption of more than 900 million tons (19 quadrillion Btus) would rise to 1,550 million tons in 2010 and to nearly 2,600 million tons by 2030. Coal's share of electricity generation, now about 55%, would grow to 75% by 2030 under the current policy base assumptions of the DOE. The NES, however, projects that surge of nuclear power plant construction will stem the growth of coal use. The strategy would still increase coal use, from 19 quadrillion Btus today to about 28 quads in 2010, but to only 32 quads by 2030. By 2030, coal would account for less than 50% of electricity generation under the NES. Total clean coal technologies capacity is substantially lower under the NES scenario case than under the clean coal actions alone. The strategy also contains good news for the coal industry in the short run. It holds out two main goals for coal policy: maintaining coal's competitiveness while meeting environmental, health and safety requirements; and creating a favorable export climate for US coal and coal technology

  6. Research report of FY 1997 on the environmentally acceptable coal utilization system introduction support project. Follow-up project on circulating fluidized bed boiler introduction (Calaca Batangas Thermal Power Station); 1997 nendo chosa hokokusho. Kankyo chowagata sekitan riyo system donyu shien jigyo (junkan ryudosho boiler ni kakawaru follow up jigyo (Calaca Batangas karyoku hatsudensho))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    For the follow-up project, to promote the diffusion of results of the clean coal technology (CCT) model projects, experts of circulating fluidized bed boilers were dispatched, to guide and advise for the operation of facilities introduced in these projects. The purpose of these projects is to diffuse the CCTs, and to support the promotion of environmental measures. Some guidance and advice about operation processes, data processing, operation regulation, maintenance, and boiler maintenance works were provided to the Ministry of Energy and Electric Power Corporation of the Philippines. Semirara, Malangas, and Samar coals in the Philippines were used for the tests. The boiler facilities could be operated by Philippine operators themselves. Based on the guidance and advice about operation processes, combustion tests using various Philippine coals were also planned and conducted by themselves. The maintenance techniques were transferred to Philippine operators through the inspection, repair and advice. The Philippine side understood the technologies well, and the circulating fluidized bed boiler technology was independently educated in the Philippines. 23 figs., 16 tabs.

  7. Development of dry coal feeders

    Science.gov (United States)

    Bonin, J. H.; Cantey, D. E.; Daniel, A. D., Jr.; Meyer, J. W.

    1977-01-01

    Design and fabrication of equipment of feed coal into pressurized environments were investigated. Concepts were selected based on feeder system performance and economic projections. These systems include: two approaches using rotating components, a gas or steam driven ejector, and a modified standpipe feeder concept. Results of development testing of critical components, design procedures, and performance prediction techniques are reviewed.

  8. Fabrication and installment of hard-wired I and C works for the neutral beam injection system of the KSTAR project

    International Nuclear Information System (INIS)

    Jung, Ki Sok; Oh, Byung Hun; In, Sang Ryul; Yoon, Jae Sung

    2004-01-01

    Instrumentation and Control(I and C) of the neutral beam injection(NBI) system for the K-STAR national fusion research project has been working from the start of the project to answer diverse requests arising from various facets of the development and construction phases of the project. In a parallel effort with the software oriented I and C development, there has been existing an enormous amount of hard-wiring I and C works for the NBI facility to be developed and fabricated in schedule. Circuits and hardwired functions have been designed, tested, fabricated, and finally installed to the relevant parts of the system. Some examples of those hard-wired I and C works are related to the vacuum system, gas feeding system, arc detector circuit, ion source monitoring, bending magnet and calorimeter. They are one of those integral parts for the proper operation of the NBI system. Examples of those hard-wired I and C works are introduced in this presentation

  9. Fabrication and installment of the hard-wired I and C works for the neutral beam injection test stand of the K-STAR project

    International Nuclear Information System (INIS)

    Jung, Ki Sok; Oh, Byung Hun

    2004-12-01

    Instrumentation and Control(I and C) of the neutral beam injection test stand (NBI-TS) for the K-STAR national fusion research project has been underway since the start of the project to answer the diverse requests arising from the various facets of the development and construction phases of the project. In a parallel effort with the software oriented I and C development, there has been existing an enormous amount of hard-wiring I and C works for the NBI facility to be developed and fabricated in schedule. Circuits and hardwired functions have been designed, tested, fabricated, and finally installed to the relevant parts of the system. Examples of those hard-wired I and C works are related to the vacuum system, gas feeding system, arc detector circuit, ion source monitoring, bending magnet and calorimeter. Another one to be mentioned is the interlock circuitry. One of the interlock circuits are related to the coolant flow failure. The other is the interlock circuit related to the vacuum failure. All of the above mentioned circuitry now constitutes integral parts for the proper operation of the NBI system; details of those hard-wired I and C work are described in this report

  10. NONEQUILIBRIUM SULFUR CAPTURE AND RETENTION IN AN AIR COOLED SLAGGING COAL COMBUSTOR

    International Nuclear Information System (INIS)

    Dr. Bert Zauderer

    1999-01-01

    Calcium oxide injected in a slagging combustor reacts with the sulfur from coal combustion to form sulfur-bearing particles. They are deposited on the liquid slag layer on the combustor wall. Due to the low solubility of sulfur in slag, slag must be rapidly drained from the combustor to limit sulfur gas re-evolution. Analysis indicated that slag mass flow rates in excess of 400 lb/hr should limit sulfur re-evolution. The objective of this 42-month project was to perform a series of tests to determine the factors that control the retention of the sulfur in the slag. 36 days of testing on the combustor were completed prior to the end of this reporting period, 12/31/98. This compares with 16 tests required in the original project plan. Combustor tests in early 1997 with high (37%) ash, Indian coal confirmed that high slag mass flow rates of about 500 lb/hr resulted in retention in the slag of up to 20% of the injected sulfur content mineral matter. To further increase the slag flow rate, rice husks, which contain 20% ash, and rice husk char, which contain 70% ash, were co-fired with coal in the combustor. A series of 13 combustor tests were performed in fourth quarter of 1997 and a further 6 tests were performed in January 1998 and in the summer of 1998. The test objective was to achieve slag flow rates between 500 and 1,000 lb/hr. Due to the very low bulk density of rice husk, compared to pulverized coal, almost the entire test effort focused on developing methods for feeding the rice husks into combustor. In the last test of December 1997, a peak mineral matter, injection rate of 592 lb/hr was briefly achieved by injection of coal, rice husk char, gypsum, and limestone into the combustor. However, no significant sulfur concentration was measured in the slag removed from the combustor. The peak injection rate reached with biomass in the 1997 tests was 310 lb/hr with rice husk, and 584 lb/hr with rice husk char

  11. 2nd clean coal & carbon capture - securing the future. Conference documentation and delegate information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The presentations covered: policies and the regulatory environment - creating opportunities for clean coal technologies; mastering the economics of clean coal - gaining finance and investment for key projects; international initiatives in clean coal technologies; power plant developments; broader uses for coal; and carbon capture and storage.

  12. 76 FR 336 - Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) for PacRim Coal's Proposed...

    Science.gov (United States)

    2011-01-04

    ... Environmental Impact Statement (SEIS) for PacRim Coal's Proposed Chuitna Coal Project AGENCY: U.S. Army Corps of... Chuitna Coal Project. It is anticipated that the Environmental Protection Agency (EPA), the Native Village... the Alaska Surface Coal Mining Control and Reclamation Act (ASCMCRA) permit, which governs all aspects...

  13. Microseismic Monitoring of CO2 Injection at the Penn West Enhanced Oil Recovery Pilot Project, Canada: Implications for Detection of Wellbore Leakage

    Directory of Open Access Journals (Sweden)

    Gonzalo Zambrano-Narváez

    2013-09-01

    Full Text Available A passive seismic monitoring campaign was carried out in the frame of a CO2-Enhanced Oil Recovery (EOR pilot project in Alberta, Canada. Our analysis focuses on a two-week period during which prominent downhole pressure fluctuations in the reservoir were accompanied by a leakage of CO2 and CH4 along the monitoring well equipped with an array of short-period borehole geophones. We applied state of the art seismological processing schemes to the continuous seismic waveform recordings. During the analyzed time period we did not find evidence of induced micro-seismicity associated with CO2 injection. Instead, we identified signals related to the leakage of CO2 and CH4, in that seven out of the eight geophones show a clearly elevated noise level framing the onset time of leakage along the monitoring well. Our results confirm that micro-seismic monitoring of reservoir treatment can contribute towards improved reservoir monitoring and leakage detection.

  14. Microseismic monitoring of CO2 injection at the Penn West Enhanced Oil Recovery pilot project, Canada: implications for detection of wellbore leakage.

    Science.gov (United States)

    Martínez-Garzón, Patricia; Bohnhoff, Marco; Kwiatek, Grzegorz; Zambrano-Narváez, Gonzalo; Chalaturnyk, Rick

    2013-09-02

    A passive seismic monitoring campaign was carried out in the frame of a CO2-Enhanced Oil Recovery (EOR) pilot project in Alberta, Canada. Our analysis focuses on a two-week period during which prominent downhole pressure fluctuations in the reservoir were accompanied by a leakage of CO2 and CH4 along the monitoring well equipped with an array of short-period borehole geophones. We applied state of the art seismological processing schemes to the continuous seismic waveform recordings. During the analyzed time period we did not find evidence of induced micro-seismicity associated with CO2 injection. Instead, we identified signals related to the leakage of CO2 and CH4, in that seven out of the eight geophones show a clearly elevated noise level framing the onset time of leakage along the monitoring well. Our results confirm that micro-seismic monitoring of reservoir treatment can contribute towards improved reservoir monitoring and leakage detection.

  15. FY 1999 report on the potential survey of the environmentally friendly type coal utilization system - Dispatch of engineers. A. Project for supporting the introduction of the environmentally friendly type coal utilization system (model project)/pre-survey for the potential survey; 1999 nendo kankyo chowa gata sekitan riyo system kanosei chosa. Senmomka haken A. kankyo chowa gata sekitan riyo system donyu shien jigyo (model jigyo) - Kanosei chosa no jizen chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of the improvement of coal utilization technology and environmental preservation, the paper conducted the pre-survey of the introduction of coke oven gas desulfurization facilities in China and pre-survey of potentiality of the environmentally friendly type coal utilization system in India. The pre-survey in China was made for Anyang Steel Group Co. Ltd. and Laiwu Steel Group Co. Ltd. to judge their adaptability as site for the demonstrative project on the introduction of coke oven gas desulfurization facilities. As a result, it was confirmed that the former satisfied the conditions on Japan side such as the space for installation and prospect for fund raising. However, the amount of COG treatment was larger than that planned at Japan side, and it was found that as to the recovered sulfur, the company wanted the solid sulfur different from the fused sulfur planned at Japan side. In the survey in India, explanations were made to India of CFBC and the fluidized bed cement sintering system, bio-briquette production facilities, facilities for environmental measures, coal reforming technology, etc. At the same time, the site survey was made to examine/analyze possibilities of spread/development of Japan's CCT. (NEDO)

  16. Coal surface control for advanced physical fine coal cleaning technologies. Final report, September 19, 1988--August 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Morsi, B.I.; Chiang, S.H.; Sharkey, A.; Blachere, J.; Klinzing, G.; Araujo, G.; Cheng, Y.S.; Gray, R.; Streeter, R.; Bi, H.; Campbell, P.; Chiarlli, P.; Ciocco, M.; Hittle, L.; Kim, S.; Kim, Y.; Perez, L.; Venkatadri, R.

    1992-12-31

    This final report presents the research work carried out on the Coal Surface Control for Advanced Physical Fine Coal Cleaning Technologies project, sponsored by the US Department of Energy, Pittsburgh Energy Technology Center (DOE/PETC). The project was to support the engineering development of the selective agglomeration technology in order to reduce the sulfur content of US coals for controlling SO{sub 2} emissions (i.e., acid rain precursors). The overall effort was a part of the DOE/PETCs Acid Rain Control Initiative (ARCI). The overall objective of the project is to develop techniques for coal surface control prior to the advanced physical fine coal cleaning process of selective agglomeration in order to achieve 85% pyrite sulfur rejection at an energy recovery greater than 85% based on run-of-mine coal. The surface control is meant to encompass surface modification during grinding and laboratory beneficiation testing. The project includes the following tasks: Project planning; methods for analysis of samples; development of standard beneficiation test; grinding studies; modification of particle surface; and exploratory R&D and support. The coal samples used in this project include three base coals, Upper Freeport - Indiana County, PA, Pittsburgh NO. 8 - Belmont County, OH, and Illinois No. 6 - Randolph County, IL, and three additional coals, Upper Freeport - Grant County- WV, Kentucky No. 9 Hopkins County, KY, and Wyodak - Campbell County, WY. A total of 149 drums of coal were received.

  17. Ultravitrinite coals from Chukotka

    Energy Technology Data Exchange (ETDEWEB)

    Lapo, A.V.; Letushova, I.A.

    1979-03-01

    Chemical and petrographic analysis was conducted on coals from the Anadyrya and Bukhti Ugol'noi deposits. Characteristics of the most prevalent type of vitrinite coals in both regions are presented here. Anadyrya coals belong to a transitional phase between brown coal and long flame. Ultravitrinite coals predominate. Gas coals from Bukti Ugol'noi have a higher carbon content than Anadyrya coals. They also have a higher hydrogen content and yield of initial resin. In several cases there was also a higher yield of volatile substances. Chukotka coals are characterized by a 10 percent higher initial resin yield than equally coalified Donetsk coals, other indicators were equal to those of Donetsk coals. Because of this, Chukotka coals are suitable for fuel in power plants and as raw materials in the chemical industry. (15 refs.) (In Russian)

  18. The European Coal Market: Will Coal Survive the EC's Energy and Climate Policies?

    International Nuclear Information System (INIS)

    Cornot-Gandolphe, Sylvie

    2012-01-01

    conventional reserves of fossil fuels. Coal contributes to the economic activity and employment in the region. The EU mining industry employs 260,000 workers (direct jobs) and the turnover of the whole coal industry is estimated at Euros 25 billion a year. Coal prices, despite their rising trend in the past few years, are much lower than competing fuels: half the price of natural gas imported in Europe. As coal ensures safe, reliable, affordable and sustainable energy for all, it will be very much needed in the years to come. However, coal is proscribed in a CO 2 -free environment. Its combustion in thermal power plants - its main outlet in Europe - emits twice as much CO 2 as gas plants. Although a lot of R and D work is done to capture CO 2 emissions from coal plants and store it, no zero emission commercial plants have yet started operation. Several CCS projects have been delayed, or even cancelled, in the past few years due to regulatory uncertainties, a lack of funding and public opposition to CO 2 storage. The current European economic crisis and the large sovereign debts have also reduced public funding in CCS projects. The future of coal in Europe is therefore very uncertain. Will CCS development allows it to remain a fuel of choice, given large available reserves at low prices, compared with competing energy sources? Or will coal disappear from the European energy mix? How fast will the decline in European coal production be? This report looks at these issues and highlights some facts, trends and regulation that may affect the supply and demand of coal in the future. The analysis concentrates on steam coal used to generate electricity, since the power generation sector is by far the largest user of coal in Europe. The first part of this report looks at the European coal market region-wide. Chapter 1 describes the EU coal market in the global context. Chapter 2 analyses the significance of the European coal mining industry and its future after the end of state aid

  19. Coal Tar and Coal-Tar Pitch

    Science.gov (United States)

    Learn about coal-tar products, which can raise your risk of skin cancer, lung cancer, and other types of cancer. Examples of coal-tar products include creosote, coal-tar pitch, and certain preparations used to treat skin conditions such as eczema, psoriasis, and dandruff.

  20. Pre-Test CFD for the Design and Execution of the Enhanced Injection and Mixing Project at NASA Langley Research Center

    Science.gov (United States)

    Drozda, Tomasz G.; Axdahl, Erik L.; Cabell, Karen F.

    2014-01-01

    With the increasing costs of physics experiments and simultaneous increase in availability and maturity of computational tools it is not surprising that computational fluid dynamics (CFD) is playing an increasingly important role, not only in post-test investigations, but also in the early stages of experimental planning. This paper describes a CFD-based effort executed in close collaboration between computational fluid dynamicists and experimentalists to develop a virtual experiment during the early planning stages of the Enhanced Injection and Mixing project at NASA Langley Research Center. This projects aims to investigate supersonic combustion ramjet (scramjet) fuel injection and mixing physics, improve the understanding of underlying physical processes, and develop enhancement strategies and functional relationships relevant to flight Mach numbers greater than 8. The purpose of the virtual experiment was to provide flow field data to aid in the design of the experimental apparatus and the in-stream rake probes, to verify the nonintrusive measurements based on NO-PLIF, and to perform pre-test analysis of quantities obtainable from the experiment and CFD. The approach also allowed for the joint team to develop common data processing and analysis tools, and to test research ideas. The virtual experiment consisted of a series of Reynolds-averaged simulations (RAS). These simulations included the facility nozzle, the experimental apparatus with a baseline strut injector, and the test cabin. Pure helium and helium-air mixtures were used to determine the efficacy of different inert gases to model hydrogen injection. The results of the simulations were analyzed by computing mixing efficiency, total pressure recovery, and stream thrust potential. As the experimental effort progresses, the simulation results will be compared with the experimental data to calibrate the modeling constants present in the CFD and validate simulation fidelity. CFD will also be used to

  1. Achievement report for fiscal 1981 on Sunshine Program-assisted project. Survey of Australian industrial capability and construction capability relative to Australian brown coal liquefaction plant construction project; 1981 nendo Goshu kattan ekika plant no kensetsu ni kakawaru kogyoryoku, kensetsu kojiryoku ni kansuru chosa seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    The industrial capability and construction capability of Australia are surveyed in relation with the project of constructing a brown coal liquefaction plant there. Australian heavy industry is conspicuously advanced in the field of mining machinery involving coal, iron ore, and other mineral resources. On the other hand, in the fields of general-purpose machinery for plants and of civil engineering machinery, it is behind other countries in terms of technology and cost because of the small market. When an industrial project is implemented in Australia, consulting firms, engineering contractors, etc., operate independently from each other, and the project is propelled forward under a perfect specialization system. Labor-related problems in the civil engineering and construction industry are the recruitment of laborers which is difficult and the delay in and suspension of construction due to labor disputes that take place very frequently. In Victoria State where a brown coal liquefaction plant is under construction, the availability of laborers specializing in construction is rather higher than in other states, and there is no important problem in this respect. One cannot be too prudent in Victoria State, however, since it includes a region which is the most notorious in Australia in terms of labor-management dispute. (NEDO)

  2. Record coking coal settlements

    Energy Technology Data Exchange (ETDEWEB)

    Macdonald, C.

    2005-02-01

    The US$100/tonne psychological barrier in coking coal prices has been well and truly smashed. The article examines developments in coal pricing. It includes quotes from many senior executives in the coal industry as collected at McCloskey's Australian Coal.04 conference held in Sydney, 18-19 November 2004. 2 photos.

  3. COAL Conference Poster

    OpenAIRE

    Brown, Taylor Alexander; McGibbney, Lewis John

    2017-01-01

    COAL Conference Poster This archive contains the COAL conference poster for the AGU Fall Meeting 2017 by Taylor Alexander Brown. The Inkscape SVG source is available at https://github.com/capstone-coal/coal-conference-poster/ under the Creative Commons Attribution-ShareAlike 4.0 International license.

  4. Granisetron Injection

    Science.gov (United States)

    Granisetron immediate-release injection is used to prevent nausea and vomiting caused by cancer chemotherapy and to ... nausea and vomiting that may occur after surgery. Granisetron extended-release (long-acting) injection is used with ...

  5. Edaravone Injection

    Science.gov (United States)

    Edaravone injection is used to treat amyotrophic lateral sclerosis (ALS, Lou Gehrig's disease; a condition in which ... die, causing the muscles to shrink and weaken). Edaravone injection is in a class of medications called ...

  6. Meropenem Injection

    Science.gov (United States)

    ... injection is in a class of medications called antibiotics. It works by killing bacteria that cause infection.Antibiotics such as meropenem injection will not work for colds, flu, or other viral infections. Taking ...

  7. Chloramphenicol Injection

    Science.gov (United States)

    ... injection is in a class of medications called antibiotics. It works by stopping the growth of bacteria..Antibiotics such as chloramphenicol injection will not work for colds, flu, or other viral infections. Taking ...

  8. Colistimethate Injection

    Science.gov (United States)

    ... injection is in a class of medications called antibiotics. It works by killing bacteria.Antibiotics such as colistimethate injection will not work for colds, flu, or other viral infections. Using ...

  9. Defibrotide Injection

    Science.gov (United States)

    Defibrotide injection is used to treat adults and children with hepatic veno-occlusive disease (VOD; blocked blood ... the body and then returned to the body). Defibrotide injection is in a class of medications called ...

  10. Nalbuphine Injection

    Science.gov (United States)

    ... injection is in a class of medications called opioid agonist-antagonists. It works by changing the way ... suddenly stop using nalbuphine injection, you may experience withdrawal symptoms including restlessness; teary eyes; runny nose; yawning; ...

  11. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  12. Coal option. [Shell Co

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    This paper notes the necessity of developing an international coal trade on a very large scale. The role of Shell in the coal industry is examined; the regions in which Shell companies are most active are Australia, Southern Africa, Indonesia; Europe and North America. Research is being carried out on marketing and transportation, especially via slurry pipelines; coal-oil emulsions; briquets; fluidized-bed combustion; recovery of coal from potential waste material; upgrading of low-rank coals; unconventional forms of mining; coal conversion (the Shell/Koppers high-pressure coal gasification process). Techniques for cleaning flue gas (the Shell Flue Gas Desulfurization process) are being examined.

  13. Concerning coal: an anthology

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, M.; Hawse, M.L.; Maloney, P.J. [eds.

    1997-12-31

    The anthology takes a humanistic look at coal mining in Illinois. One of its goals is to increase public awareness of coal in American society; it also seeks to enhance understanding of the historical aspects of coal and to study the impact of coal on mining families. Many of the 25 selections in the anthology come from Coal Research Center publications, `Concerning coal` and `Mineral matters`. Articles are arranged in three parts entitled: life in the mining community; mining in folklore, story telling, literature, art and music; and technology as it affected the people of the coal fields. 117 refs., 25 photos. 1 map.

  14. Research on mechanism of and catalysts for extraction liquefaction of coal using coal-based solvents; Sekitankei yozai ni yoru sekitan no chushutsu ekika kiko to shokubai no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    Papers of Professor Yoshio Kamiya of Tokyo University are compiled into this report. The list of the papers includes (1) Synthesis of heavy fuel oils from coal; (2) Research and development of coal liquefaction; (3) Dissolution reaction of coal by hydrogen-donating aromatic solvents (I); (4) Effect of hydrogen-donor solvent on the liquefaction of coal; (5) Recent studies on the chemical structure of solvent refined coal; (6) Dissolution reaction of coal by hydrogen-donating aromatic solvents (II); (7) Future of coal as energy material; (8), (9), (10) same as (6) in the subject discussed; (11) Recent studies on coal liquefaction catalysts; (12) Environmental problems and drain treatment to accompany processes of converting fossil resources into fuels; (13) Chemistry of coal oxidation; (14) Fractionation and analysis of solvent refined coal by gel permeation chromatography; (15) Current state of research and development of coal liquefaction; (16) Properties and components of coal oils from coal liquefaction processes under development; (17) Solvent effect of coal derived aromatic compounds on the liquefaction of Akabira coal; (18) Chemistry of coal liquefaction; (19) Research and development of coal liquefaction in the U.S.; (20) Thermal treatment of coal-related aromatic ethers in tetralin solution; (21) Recent technology of utilizing heavy carbon resources; (22) Chemical properties and reactivity of coal; (23) Current state and future of development of coal liquefaction processes; and (24) Development of overseas coal liquefaction projects. (NEDO)

  15. Coal information 1995

    International Nuclear Information System (INIS)

    1996-01-01

    This volume is a comprehensive reference book on current world coal market trends and long-term prospects to 2010. It contains an in-depth analysis of the 1995 international coal market covering prices, demand, trade, supply and production capacity as well as over 450 pages of country specific statistics on OECD and key non-OECD coal producing and consuming countries. The book also includes a summary of environmental policies on climate change and on coal-related air quality issues as well as essential facts on coal-fired power stations in coal-importing regions, on coal ports world-wide and on emission standards for coal-fired boilers in OECD countries. Coal Information is one of a series of annual IEA statistical publications on major energy sources; other reports are Oil and Gas Information and Electricity Information. Coal Information 1995 is published in July 1996. (author)

  16. Coal yearbook 1993

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    This book is the first coal yearbook published by ATIC (France). In a first chapter, economical context of coal worldwide market is analyzed: comparative evaluations on coal exports and imports, coal industry, prices, production in USA, Australia, South Africa, China, former USSR, Poland, Colombia, Venezuela and Indonesia are given. The second chapter describes the french energy context: national coal production, imports, sectorial analysis, maritime transport. The third chapter describes briefly the technologies of clean coal and energy saving developed by Charbonnages de France: fossil-fuel power plants with combined cycles and cogeneration, fluidized beds for the recovery of coal residues, recycling of agricultural wastes (sugar cane wastes) in thermal power plant, coal desulfurization for air pollution abatement. In the last chapter, statistical data on coal, natural gas and crude oil are offered: world production, world imports, world exports, french imports, deliveries to France, coal balance, french consumption of primary energy, power generation by fuel type

  17. Report on the achievements in the Sunshine Project in fiscal 1987. Collection of data from coal liquefaction processes, and development of a disposal system; 1987 nendo sekitan ekika process nado no data no shushu, shori system nado no kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The present study is intended to investigate the current status of the information control system in the coal liquefaction technology development project, and structure a coal liquefaction database system to manage and utilize comprehensively the items of information provided by the system. Section 2 shows the result of epitomizing opinions on the purpose of the coal liquefaction database by means of a questionnaire survey to NEDO, and opinions of people of experience and academic standing. Section 3 depicts the basic conception of a coal database total system. Section 4 summarizes the conceptual idea of the fundamental database by washing out the data input and output, and the contents recorded in the database. Section 5 summarizes the basic sub-system required for management and utilization of the database, and different application systems for data analysis required in each stage of performing the coal liquefaction technology development, and for operation assistance. Section 6 summarizes a general technological information retrieval system, in which general information on coal liquefaction is recorded, processed, and registered and accumulated in the database, and then the information retrieval and the original information providing service are carried out. Section 7 summarizes philosophies on development and operation of the coal liquefaction database, operating institutions, and problems to be solved. (NEDO)

  18. Report on the fiscal 1997 result of the Japan-China joint demonstration project of environment-friendly cost utilization systems. Low grade coal combustion system (Zhejiang Huba Co. Ltd.); 1997 nendo seika hokokusho kankyo chowagata sekitan riyo system kyodo jissho jigyo. Teihin`itan nensho system ni kakawaru jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This demonstration project aims at reduction of pollutants derived from coal utilization in China by demonstration of CCT to be diffused in China and preparation of diffusion bases, and stable import of energy for Japan. A low-grade coal combustion system burns low-grade coal by use of an internal circulating fluidized bed boiler which burns coal by uniform mixing and circulation of coal and some particles such as limestone and ash. Main specifications of the boiler are as follows: evaporation rate of 35t/h, steam pressure of 3.82MPa (39.0kg/cm{sup 2}), steam temperature of 450degC, water supply temperature of 150degC, internal circulating fluidized bed combustion type, boiler efficiency of 75%, and desulfurization rate of 90% or more. Main properties of low-grade coal are as follows: calorific value of 1830kcal/kg, coal size of 10mm or less, total water content of 2.5%, total S content of 2.7%, ash content of 67.7%, limestone purity of 50% or more, and stone size of 3mm or less. The results in fiscal 1997 are as follows: field survey and arrangement, basic planning and design, design, production and procurement of equipment, training, and dispatch of field supervisor. 26 figs., 3 tabs.

  19. ACR coal 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This publication is a comprehensive reference document on production, exports, prices and demand of coal in world markets. A forecast of demand by coal type and country up to the year 2000 is provided. Statistics of the Australian export industry are complemented by those of South Africa, USA, Canada, Indonesia, China, C.I.S. and Colombia. A very comprehensive coal quality specification for nearly all the coal brands exported from Australia, as well as leading non-Australian coal brands, is included.

  20. Assessing coal burnout

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, A. [Pacific Power, Sydney, NSW (Australia)

    1999-11-01

    Recent research has allowed a quantitative description of the basic process of burnout for pulverized coals to be made. The Cooperative Research Centre for Black Coal Utilization has built on this work to develop a coal combustion model which will allow plant engineers and coal company representatives to assess their coals for combustion performance. The paper describes the model and its validation and outlines how it is run. 2 figs.

  1. Analytical support for coal technologies

    Directory of Open Access Journals (Sweden)

    Valášek Václav

    1998-09-01

    Full Text Available On the basis of success in the selection negotiation The Brown Coal Research Institute j.s.c. Most was authorized to process the project Phare D5/93 with the title "Analytical support to clean coal technologies". The elaboration of the task run in 1997 in a close cooperation with the Mining University - TU Ostrava; DBI - AUA GmbH, Freiberg, Germany; DMT mbH, Essen, Germany and Cerchar, Mazingarbe, France. In the work the available reserves of brown and hard coal and from them following possible levels of annual minings in relation to prognosed needs of the electro-energetics and heating-industry were evaluated. The knowledge about the contents of selected trace elements (As, Be, Cd, Cl, Co, Cr, Cu, F, Hg, Mn, Ni, Pb, Sb, Se, Te, Tl, V, Zn in Czech (CZ coal were also evaluated it was investigated. Further, the distribution of trace elements during the burning process in four types of boilers in CZ. was investigated. The CZ and EU legislation related to trace elements in coal and combustion products was finally comparred. It was stated that the CZ legal standards are not at variant with EU the standards.

  2. Basic studies on coal liquefaction reaction, reforming and utilization of liquefaction products

    Energy Technology Data Exchange (ETDEWEB)

    Shiraishi, M. (National Institute for Resources and Environment, Tsukuba (Japan))

    1993-09-01

    This report describes the achievement of research and development of coal liquefaction technologies in the Sunshine Project for FY 1992, regarding the coal liquefaction reaction, reforming and utilization of liquefaction products. For the fundamental study on coal liquefaction reaction, were investigated effect of asphaltene in petroleum residue on coprocessing, pretreatment effect in coprocessing of Taiheiyo coal and tarsand bitumen using oil soluble catalyst, solubilization and liquefaction of Taiheiyo coal at mild conditions with the aid of super acid, and flash hydropyrolysis of finely pulverized swollen coal under high hydrogen pressure. On the other hand, for the study on hydrotreatment of coal derived liquid, were investigated catalytic hydroprocessing of Wandoan coal liquids, production of gasoline from coal liquids by fluid catalytic cracking, solvent extraction of phenolic compounds from coal liquids, and separation of hetero compounds in coal liquid by means of high pressure crystallization. Further progress in these studies has been confirmed. 9 figs., 6 tabs.

  3. Report on 1981 result of Sunshine Project. Research on direct liquefaction reactor of coal; 1981 nendo sekitan no chokusetsu ekika hannoki no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    This paper explains the results of research on direct liquefaction reaction of coal in fiscal 1981. The direct liquefaction is a reaction of three phases, gas-liquid-solid, under high temperature and high pressure. A tube type was employed in order to increase volume efficiency of the reactor, the continuous phase disperse number was decreased in order to bring it close to plug flow, and the paste Re number was increased to some extent in order to prevent sedimentation of coal particles. Hydrogen was supplied from the tube halfway for the purpose of supplementing the lowering of hydrogen partial pressure with the progress of reaction. A gas-liquid separator was installed so that increase in gas quantity was controlled in the rear stage of the reactor. As for catalysts, iron ore-sulfur system was examined which was promising as a disposable catalyst in place of the conventional iron system. Effect of catalytic addition was clearly recognizable in comparison with non-catalytic, with an exothermic peak observed comparable to the coal hydrogenation reaction of 350-420 degree C. Its catalytic effect was also presumable from the high pressure differential thermal analysis curve. The catalytic mechanism in the case where sulfur is added to hematite and limonite is similar to that of Fe{sub 2}O{sub 3} - sulfur catalyst, with the center of activity supposed to be Fe{sub 1-x}S. The catalytic effect is largely dependent on the particle size. (NEDO)

  4. Study of China's coal supply cost

    International Nuclear Information System (INIS)

    Schneider, K.

    1998-01-01

    The Department of Primary Industries and Energy is funding a joint research project between ABARE and the Energy Research Institute of China's State Planning Commission, China's leading organisation undertaking policy-related energy sector research. Together, the two organisations will analyse the economic costs and impacts of moving large quantities of coal from China's northern coal fields to, power stations in the rapidly growing south-eastern coastal provinces. The study will also compare the true economic costs of using domestic coal - including the costs of subsidies on coal production and transport - with the costs of using imported coal. ABARE will use its dynamic model, MEGABARE, to undertake ky parts of the study, taking into account the complex linkages between sectors in an economy and between different economies

  5. A clean coal: myth or reality?

    International Nuclear Information System (INIS)

    2010-01-01

    The first part of this report comments the evolution of coal demand which has doubled during the last 35 years for different reasons (increase of electricity production, development of China and India), but is still based on local production although coal international trade increased indeed quicker than coal demand. It notices that there is still a lot of coal available for the future, and that demand will keep on increasing. It outlines that coal will have to reduce its impacts on the environment, and presents the technologies which will allow this reduction. It also presents the technologies for CO 2 capture and storage (CCS), and evokes its regulatory issues and its environmental impacts. Some research and development projects in CCS in different countries (Europe, Germany, United States, Australia) are presented. Finally, it stresses the importance of a global deployment of much less polluting technologies to limit greenhouse gas emissions

  6. The directory of US coal and technology export resources

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-01

    The purpose of The Directory remains focused on offering a consolidated resource to potential buyers of US coal, coal technology, and expertise. This is consistent with the US policy on coal and coal technology trade, which continues to emphasize export market strategy implementation. Within this context, DOE will continue to support the teaming'' approach to marketing; i.e., vertically integrated large project teams to include multiple industry sectors, such as coal producers, engineering and construction firms, equipment manufacturers, financing and service organizations.

  7. China’s farewell to coal: A forecast of coal consumption through 2020

    International Nuclear Information System (INIS)

    Hao, Yu; Zhang, Zong-Yong; Liao, Hua; Wei, Yi-Ming

    2015-01-01

    In recent decades, China has encountered serious environmental problem, especially severe air pollution that has affected eastern and northern China frequently. Because most air pollutants in China are closely related to coal combustion, the restriction of coal consumption is critical to the improvement of the environment in China. In this study, a panel of 29 Chinese provinces from 1995 to 2012 is utilized to predict China’s coal consumption through 2020. After controlling for the spatial correlation of coal consumption among neighboring provinces, an inverted U-shaped Environmental Kuznets Curve (EKC) between coal consumption per capita and GDP per capita in China is detected. Furthermore, based on the estimation results and reasonable predictions of key control variables, China’s provincial and national coal consumption through 2020 is forecasted. Specifically, under the benchmark scenario, consumption is expected to continue growing at a decreasing rate until 2020, when China’s coal consumption would be approximately 4.43 billion tons. However, if China can maintain relatively high growth rate (an annual growth rate of 7.8 percent), the turning point in total coal consumption would occur in 2019, with projected consumption peaking at 4.16 billion tons. - Highlights: • Provincial panel data is used to investigate the influential factors of coal consumption in China. • The spatial correlations of coal consumption in neighboring provinces are fully considered. • An inverted-U shaped Environmental Kuznets Curve for coal consumption in China has been found. • Based on the estimation results, China’s national coal consumption before 2020 is forecasted. • Under the basic scenario, China’s national coal consumption will grow at a decreasing speed till 2020.

  8. Methods for producing and upgrading liquid hydrocarbons from Alberta coal

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    This publication describes a number of research projects into hydrotreating, the treatment necessary for synthetic crude oils to become suitable as feedstocks for refineries. The projects include the hydroprocessing of coal-based liquids, functional group analysis, isotopic studies of co-processing schemes, and co-processing coal and bitumen with molten halide catalysts.

  9. Analysis of CO2 Separation from Flue Gas, Pipeline Transportation, and Sequestration in Coal

    Energy Technology Data Exchange (ETDEWEB)

    Eric P. Robertson

    2007-09-01

    This report was written to satisfy a milestone of the Enhanced Coal Bed Methane Recovery and CO2 Sequestration task of the Big Sky Carbon Sequestration project. The report begins to assess the costs associated with separating the CO2 from flue gas and then injecting it into an unminable coal seam. The technical challenges and costs associated with CO2 separation from flue gas and transportation of the separated CO2 from the point source to an appropriate sequestration target was analyzed. The report includes the selection of a specific coal-fired power plant for the application of CO2 separation technology. An appropriate CO2 separation technology was identified from existing commercial technologies. The report also includes a process design for the chosen technology tailored to the selected power plant that used to obtain accurate costs of separating the CO2 from the flue gas. In addition, an analysis of the costs for compression and transportation of the CO2 from the point-source to an appropriate coal bed sequestration site was included in the report.

  10. Hospitalization patterns associated with Appalachian coal mining.

    Science.gov (United States)

    Hendryx, Michael; Ahern, Melissa M; Nurkiewicz, Timothy R

    2007-12-01

    The goal of this study was to test whether the volume of coal mining was related to population hospitalization risk for diseases postulated to be sensitive or insensitive to coal mining by-products. The study was a retrospective analysis of 2001 adult hospitalization data (n = 93,952) for West Virginia, Kentucky, and Pennsylvania, merged with county-level coal production figures. Hospitalization data were obtained from the Health Care Utilization Project National Inpatient Sample. Diagnoses postulated to be sensitive to coal mining by-product exposure were contrasted with diagnoses postulated to be insensitive to exposure. Data were analyzed using hierarchical nonlinear models, controlling for patient age, gender, insurance, comorbidities, hospital teaching status, county poverty, and county social capital. Controlling for covariates, the volume of coal mining was significantly related to hospitalization risk for two conditions postulated to be sensitive to exposure: hypertension and chronic obstructive pulmonary disease (COPD). The odds for a COPD hospitalization increased 1% for each 1462 tons of coal, and the odds for a hypertension hospitalization increased 1% for each 1873 tons of coal. Other conditions were not related to mining volume. Exposure to particulates or other pollutants generated by coal mining activities may be linked to increased risk of COPD and hypertension hospitalizations. Limitations in the data likely result in an underestimate of associations.

  11. China's Coal: Demand, Constraints, and Externalities

    Energy Technology Data Exchange (ETDEWEB)

    Aden, Nathaniel; Fridley, David; Zheng, Nina

    2009-07-01

    This study analyzes China's coal industry by focusing on four related areas. First, data are reviewed to identify the major drivers of historical and future coal demand. Second, resource constraints and transport bottlenecks are analyzed to evaluate demand and growth scenarios. The third area assesses the physical requirements of substituting coal demand growth with other primary energy forms. Finally, the study examines the carbon- and environmental implications of China's past and future coal consumption. There are three sections that address these areas by identifying particular characteristics of China's coal industry, quantifying factors driving demand, and analyzing supply scenarios: (1) reviews the range of Chinese and international estimates of remaining coal reserves and resources as well as key characteristics of China's coal industry including historical production, resource requirements, and prices; (2) quantifies the largest drivers of coal usage to produce a bottom-up reference projection of 2025 coal demand; and (3) analyzes coal supply constraints, substitution options, and environmental externalities. Finally, the last section presents conclusions on the role of coal in China's ongoing energy and economic development. China has been, is, and will continue to be a coal-powered economy. In 2007 Chinese coal production contained more energy than total Middle Eastern oil production. The rapid growth of coal demand after 2001 created supply strains and bottlenecks that raise questions about sustainability. Urbanization, heavy industrial growth, and increasing per-capita income are the primary interrelated drivers of rising coal usage. In 2007, the power sector, iron and steel, and cement production accounted for 66% of coal consumption. Power generation is becoming more efficient, but even extensive roll-out of the highest efficiency units would save only 14% of projected 2025 coal demand for the power sector. A new wedge of

  12. BOILER MATERIALS FOR ULTRASUPERCRITICAL COAL POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    R. Viswanathan; K. Coleman; R.W. Swindeman; J. Sarver; J. Blough; W. Mohn; M. Borden; S. Goodstine; I. Perrin

    2003-10-20

    The principal objective of this project is to develop materials technology for use in ultrasupercritical (USC) plant boilers capable of operating with 760 C (1400 F), 35 MPa (5000 psi) steam. This project has established a government/industry consortium to undertake a five-year effort to evaluate and develop of advanced materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 760 C, will increase the efficiency of coal-fired boilers from an average of 35% efficiency (current domestic fleet) to 47% (HHV). This efficiency increase will enable coal-fired power plants to generate electricity at competitive rates (irrespective of fuel costs) while reducing CO{sub 2} and other fuel-related emissions by as much as 29%. Success in achieving these objectives will support a number of broader goals. First, from a national prospective, the program will identify advanced materials that will make it possible to maintain a cost-competitive, environmentally acceptable coal-based electric generation option. High sulfur coals will specifically benefit in this respect by having these advanced materials evaluated in high-sulfur coal firing conditions and from the significant reductions in waste generation inherent in the increased operational efficiency. Second, from a national prospective, the results of this program will enable domestic boiler manufacturers to successfully compete in world markets for building high-efficiency coal-fired power plants.

  13. Pulverized coal burnout in blast furnace simulated by a drop tube furnace

    Energy Technology Data Exchange (ETDEWEB)

    Du, Shan-Wen [Steel and Aluminum Research and Development Department, China Steel Corporation, Kaohsiung 812 (China); Chen, Wei-Hsin [Department of Greenergy, National University of Tainan, Tainan 700 (China); Lucas, John A. [School of Engineering of the University of Newcastle, Callaghan, NSW 2308 (Australia)

    2010-02-15

    Reactions of pulverized coal injection (PCI) in a blast furnace were simulated using a drop tube furnace (DTF) to investigate the burnout behavior of a number of coals and coal blends. For the coals with the fuel ratio ranging from 1.36 to 6.22, the experimental results indicated that the burnout increased with decreasing the fuel ratio, except for certain coals departing from the general trend. One of the coals with the fuel ratio of 6.22 has shown its merit in combustion, implying that the blending ratio of the coal in PCI operation can be raised for a higher coke replacement ratio. The experiments also suggested that increasing blast temperature was an efficient countermeasure for promoting the combustibility of the injected coals. Higher fuel burnout could be achieved when the particle size of coal was reduced from 60-100 to 100-200 mesh. However, once the size of the tested coals was in the range of 200 and 325 mesh, the burnout could not be improved further, resulting from the agglomeration of fine particles. Considering coal blend reactions, the blending ratio of coals in PCI may be adjusted by the individual coal burnout rather than by the fuel ratio. (author)

  14. COAL DUST EMISSION PROBLEM

    Directory of Open Access Journals (Sweden)

    M. M. Biliaiev

    2016-12-01

    Full Text Available Purpose. The article aims to develop 2D numerical models for the prediction of atmospheric pollution during transportation of coal in the railway car, as well as the ways to protect the environment and the areas near to the mainline from the dust emission due to the air injection installation. Methodology. To solve this problem there were developed numerical models based on the use of the equations of motion of an inviscid incompressible fluid and mass transfer. For the numerical integration of the transport equation of the pollutant the implicit alternating-triangular difference scheme was used. For numerical integration of the 2D equation for the velocity potential the method of total approximation was used. The developed numerical models are the basis of established software package. On the basis of the constructed numerical models it was carried out a computational experiment to assess the level of air pollution when transporting bulk cargo by rail when the railway car has the air injection. Findings. 2D numerical models that belong to the class «diagnostic models» were developed. These models take into account the main physical factors affecting the process of dispersion of dust pollution in the atmosphere during transportation of bulk cargo. The developed numerical models make it possible to calculate the dust loss process, taking into account the use of the air injection of the car. They require a small cost of the computer time during practical realization at the low and medium power machines. There were submitted computational calculations to determine pollutant concentrations and the formation of the zone of pollution near the train with bulk cargo in «microscale» scale taking into account the air curtains. Originality. 2D numerical models taking into account the relevant factors influencing the process of dispersion of pollutants in the atmosphere, and the formation of the zone of pollution during transportation of bulk cargo by

  15. Fiscal 1998 geological survey overseas. Report on Tanjung Enim project for Japan-Indonesia joint coal exploration; 1998 nendo kaigai chishitsu kozo nado chosa hokokusho. Nippon Indonesia sekitan kyodo tansa Tanjung Enim project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For disclosing stratigraphy and lithofacies and for clarifying the status of coal beds in the southern Arahan area (55km{sup 2}), South Sumatra, ground surface exploration, borehole drilling, borehole geophysical logging, and seismic reflection monitoring were carried out. The survey covered a rectangular area, 11km from east to west and 5km from north to south and 60m to 130m in elevation. In the ground surface exploration effort, trenching was performed at three spots in coal bed outcrops in an quasi-accurate survey with route gaps of roughly 1,200m. Ten boreholes w