WorldWideScience

Sample records for coal ii project

  1. Report on evaluation for SRC-2 coal liquefaction project; SRC-II sekitan ekika project hyoka sagyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-10-01

    Among the EDS, H-Coal and SRC-2 lined up in the coal liquefaction project of the U.S., the SRC is aimed at producing 6,000 t/day as a module for a 30,000 t/day commercial plant. They expect Ash contents (iron, sulfur, etc.) in coal without basically using catalysts. The products are applicable to fuels for electricity and gas for the moment. In the element technology, there are some problems in manufacturing hydrogen by gasification of residuals as well as in slurry systems, reaction towers, etc.. In the 30,000 ton commercial plant, the coal-liquefied oil costs $19.89/bbl (price as of 1978) assuming coal costs $29.47; therefore, the feasibility is strong as a substitute for petroleum. Japan's share for the required funds will be 86.8 billion yen (if 250 yen per dollar). Since the kinds of coal are conceivably increased in number through the improvement of the process, the Pacific rim countries and these which lie on the Indian Ocean are assumed to be the major coal producing countries for Japan. The stability in storage of coal-liquefied oil is experimentally excellent, as is the compatibility with petroleum products for example. Great results can be expected in the technical know-how and the spread of element technology for Japan. (NEDO)

  2. Report on evaluation for SRC-2 coal liquefaction project; SRC-II sekitan ekika project hyoka sagyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-10-01

    Among the EDS, H-Coal and SRC-2 lined up in the coal liquefaction project of the U.S., the SRC is aimed at producing 6,000 t/day as a module for a 30,000 t/day commercial plant. They expect Ash contents (iron, sulfur, etc.) in coal without basically using catalysts. The products are applicable to fuels for electricity and gas for the moment. In the element technology, there are some problems in manufacturing hydrogen by gasification of residuals as well as in slurry systems, reaction towers, etc.. In the 30,000 ton commercial plant, the coal-liquefied oil costs $19.89/bbl (price as of 1978) assuming coal costs $29.47; therefore, the feasibility is strong as a substitute for petroleum. Japan's share for the required funds will be 86.8 billion yen (if 250 yen per dollar). Since the kinds of coal are conceivably increased in number through the improvement of the process, the Pacific rim countries and these which lie on the Indian Ocean are assumed to be the major coal producing countries for Japan. The stability in storage of coal-liquefied oil is experimentally excellent, as is the compatibility with petroleum products for example. Great results can be expected in the technical know-how and the spread of element technology for Japan. (NEDO)

  3. Coal summit II

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Various papers were presented on world coal trade. Papers include: Poland as a producer and exporter of coal; the dynamics of world coal trade; Cerrejon coal production perspectives; present state of the Australian coal industry; present state of the EC coal market and future prospects; prospects of US coal exports to Europe; forecast of Italian coal supply and demand through 1990; statistics from coal transportation outlook; status of world coal ports.

  4. Coal refuse reclamation project

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.

    1979-04-06

    A 13.8 ha abandoned coal refuse site in southwestern Illinois was reclaimed by recontouring the refuse material and covering it with a minimum 30 cm of soil. The reclamation procedure included determination of the site's final land use, collection of preconstruction environmental data, and development and implementation of engineering plans. The project is demonstrating methods that can be used to reclaim abandoned coal refuse sites, and a multidisciplinary approach is being used to evaluate postconstruction environmental and economic effects of the reclamation effort. Surface water quality has shown significant improvement and plant cover is becoming established on the site. Soil microbial populations are developing and wildlife habitats are forming. The economic value of the site and adjacent properties has increased substantially and the area's aesthetic value has been enhanced. This project is providing valuable design data for future reclamation efforts of this type.

  5. Indian coal tars. II

    Energy Technology Data Exchange (ETDEWEB)

    Basu, A N; Bhatnagar, J N; Roy, A K

    1954-01-01

    Laboratory experiments were carried out on these efforts: (1) rank and specific-gravity fractions on tar yield; (2) addition of water to the coal charge, or steam during carbonization, on yield of tar and tar acids; (3) the presence of a cracking agent (shale) with and without steam addition on the yield of tar and tar acids (the particular shale used without steam reduced the yield, and the restricted use of steam brought the yield to the former noncatalyzed level); and (4) catalytic effect of three different samples of shale, firebrick, quartz, coke, and silica-alumina on the cracking of tar acids (the most active were two of the shales, a freshly-prepared coke, and the Al/sub 2/O/sub 3/-SiO/sub 2/ catalysts that gave conversion up to 98%). The products were mainly carbon, aromatic hydrocarbons of the naphthalene series and gases (CO and H/sub 2/). The yield of the tar becomes less as coal of lower specific gravity is used or when higher temperatures are used for carbonization. The mineral matter associated with Indian coals acts as a decomposition catalyst for tar acids, as shown by experiments on the decomposition of PhOH at temperatures above 800/sup 0/.

  6. EIA projections of coal supply and demand

    International Nuclear Information System (INIS)

    Klein, D.E.

    1989-01-01

    Contents of this report include: EIA projections of coal supply and demand which covers forecasted coal supply and transportation, forecasted coal demand by consuming sector, and forecasted coal demand by the electric utility sector; and policy discussion

  7. Clean Coal Diesel Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Robert Wilson

    2006-10-31

    A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

  8. The NOXSO clean coal project

    Energy Technology Data Exchange (ETDEWEB)

    Black, J.B.; Woods, M.C.; Friedrich, J.J.; Browning, J.P. [NOXSO Corp., Bethel Park, PA (United States)

    1997-12-31

    The NOXSO Clean Coal Project will consist of designing, constructing, and operating a commercial-scale flue-gas cleanup system utilizing the NOXSO Process. The process is a waste-free, dry, post-combustion flue-gas treatment technology which uses a regenerable sorbent to simultaneously adsorb sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) from flue gas from coal-fired boilers. The NOXSO plant will be constructed at Alcoa Generating Corporation`s (AGC) Warrick Power Plant near Evansville, Indiana and will treat all the flue gas from the 150-MW Unit 2 boiler. The NOXSO plant is being designed to remove 98% of the SO{sub 2} and 75% of the NO{sub x} when the boiler is fired with 3.4 weight percent sulfur, southern-Indiana coal. The NOXSO plant by-product will be elemental sulfur. The elemental sulfur will be shipped to Olin Corporation`s Charleston, Tennessee facility for additional processing. As part of the project, a liquid SO{sub 2} plant has been constructed at this facility to convert the sulfur into liquid SO{sub 2}. The project utilizes a unique burn-in-oxygen process in which the elemental sulfur is oxidized to SO{sub 2} in a stream of compressed oxygen. The SO{sub 2} vapor will then be cooled and condensed. The burn-in-oxygen process is simpler and more environmentally friendly than conventional technologies. The liquid SO{sub 2} plant produces 99.99% pure SO{sub 2} for use at Olin`s facilities. The $82.8 million project is co-funded by the US Department of Energy (DOE) under Round III of the Clean Coal Technology program. The DOE manages the project through the Pittsburgh Energy Technology Center (PETC).

  9. Brayton Point coal conversion project (NEPCO)

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, W.F. Jr.

    1982-05-01

    The New England Power Company (NEPCO) recently converted Brayton Point Power Station Units 1, 2, and 3 from oil to coal. The coal conversion project is the largest coal conversion project in the nation to date. Stone and Webster Engineering Corporation (SWEC) was hired as the engineer/constructor for the project. Units 1 and 2 are 250-MW Combustion Engineering boilers, and Unit 3 is a 650-MW Babcock and Wilcox boiler. All three units were originally designed to burn pulverized coal but were converted to oil during the years of low oil prices. Studies performed by NEPCO and SWEC indicated that the areas discussed in the following paragraphs required upgrading before the units could efficiently burn coal and meet Federal and State environmental requirements. All units have been converted and are operating. This paper discusses design modifications required to burn coal, startup, and initial operating problems, and solutions.

  10. Coal-fired power materials - Part II

    Energy Technology Data Exchange (ETDEWEB)

    Viswanathan, V.; Purgert, R.; Rawls, P. [Electric Power Research Institute, Palo Alto, CA (United States)

    2008-09-15

    Part 1 discussed some general consideration in selection of alloys for advanced ultra supercritical (USC) coal-fired power plant boilers. This second part covers results reported by the US project consortium, which has extensively evaluated the steamside oxidation, fireside corrosion, and fabricability of the alloys selected for USC plants. 3 figs.

  11. WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2000-09-01

    The close of 1999 marked the completion of the Demonstration Period of the Wabash River Coal Gasification Repowering Project. This Final Report summarizes the engineering and construction phases and details the learning experiences from the first four years of commercial operation that made up the Demonstration Period under Department of Energy (DOE) Cooperative Agreement DE-FC21-92MC29310. This 262 MWe project is a joint venture of Global Energy Inc. (Global acquired Destec Energy's gasification assets from Dynegy in 1999) and PSI Energy, a part of Cinergy Corp. The Joint Venture was formed to participate in the Department of Energy's Clean Coal Technology (CCT) program and to demonstrate coal gasification repowering of an existing generating unit impacted by the Clean Air Act Amendments. The participants jointly developed, separately designed, constructed, own, and are now operating an integrated coal gasification combined-cycle power plant, using Global Energy's E-Gas{trademark} technology (E-Gas{trademark} is the name given to the former Destec technology developed by Dow, Destec, and Dynegy). The E-Gas{trademark} process is integrated with a new General Electric 7FA combustion turbine generator and a heat recovery steam generator in the repowering of a 1950's-vintage Westinghouse steam turbine generator using some pre-existing coal handling facilities, interconnections, and other auxiliaries. The gasification facility utilizes local high sulfur coals (up to 5.9% sulfur) and produces synthetic gas (syngas), sulfur and slag by-products. The Project has the distinction of being the largest single train coal gasification combined-cycle plant in the Western Hemisphere and is the cleanest coal-fired plant of any type in the world. The Project was the first of the CCT integrated gasification combined-cycle (IGCC) projects to achieve commercial operation.

  12. Healy Clean Coal Project: A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2003-09-01

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) Program is to provide the energy marketplace with advanced, more efficient, and environmentally responsible coal utilization options by conducting demonstrations of new technologies. These demonstration projects are intended to establish the commercial feasibility of promising advanced coal technologies that have been developed to a level at which they are ready for demonstration testing under commercial conditions. This document serves as a DOE post-project assessment (PPA) of the Healy Clean Coal Project (HCCP), selected under Round III of the CCT Program, and described in a Report to Congress (U.S. Department of Energy, 1991). The desire to demonstrate an innovative power plant that integrates an advanced slagging combustor, a heat recovery system, and both high- and low-temperature emissions control processes prompted the Alaska Industrial Development and Export Authority (AIDEA) to submit a proposal for this project. In April 1991, AIDEA entered into a cooperative agreement with DOE to conduct this project. Other team members included Golden Valley Electric Association (GVEA), host and operator; Usibelli Coal Mine, Inc., coal supplier; TRW, Inc., Space & Technology Division, combustor technology provider; Stone & Webster Engineering Corp. (S&W), engineer; Babcock & Wilcox Company (which acquired the assets of Joy Environmental Technologies, Inc.), supplier of the spray dryer absorber technology; and Steigers Corporation, provider of environmental and permitting support. Foster Wheeler Energy Corporation supplied the boiler. GVEA provided oversight of the design and provided operators during demonstration testing. The project was sited adjacent to GVEA's Healy Unit No. 1 in Healy, Alaska. The objective of this CCT project was to demonstrate the ability of the TRW Clean Coal Combustion System to operate on a blend of run-of-mine (ROM) coal and waste coal, while meeting strict

  13. Taipower - latest projects to boost coal import levels

    Energy Technology Data Exchange (ETDEWEB)

    Hargreaves, D

    1985-05-01

    The activities are reviewd for Taipower, the state enterprise electrical power utility for Taiwan RC: its generating facilities and comparability; the status of major projects, especially the Taichung thermal project; the status of coal; coal burn performance; air pollution controls; coal ash performance; coal imports; transport logistics; including terminal facilities at the Taichung thermal power plant.

  14. The Healy clean coal project: An overview

    Energy Technology Data Exchange (ETDEWEB)

    Olson, J.B.; McCrohan, D.V. [Alaska Industrial Development and Export Authority, Anchorage, AK (United States)

    1997-12-31

    The Healy Clean Coal Project, selected by the US Department of Energy under Round III of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is scheduled to be completed in August of 1997, with startup activity concluding in December of 1997. Demonstration, testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of NOx, SO{sub 2} and particulates from this 50 megawatt plant are expected to be significantly lower than current standards. The project status, its participants, a description of the technology to be demonstrated, and the operational and performance goals of this project are presented.

  15. HIGH PRESSURE COAL COMBUSTON KINETICS PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Stefano Orsino

    2005-03-30

    As part of the U.S. Department of Energy (DoE) initiative to improve the efficiency of coal-fired power plants and reduce the pollution generated by these facilities, DOE has funded the High-Pressure Coal Combustion Kinetics (HPCCK) Projects. A series of laboratory experiments were conducted on selected pulverized coals at elevated pressures with the specific goals to provide new data for pressurized coal combustion that will help extend to high pressure and validate models for burnout, pollutant formation, and generate samples of solid combustion products for analyses to fill crucial gaps in knowledge of char morphology and fly ash formation. Two series of high-pressure coal combustion experiments were performed using SRI's pressurized radiant coal flow reactor. The first series of tests characterized the near burner flame zone (NBFZ). Three coals were tested, two high volatile bituminous (Pittsburgh No.8 and Illinois No.6), and one sub-bituminous (Powder River Basin), at pressures of 1, 2, and 3 MPa (10, 20, and 30 atm). The second series of experiments, which covered high-pressure burnout (HPBO) conditions, utilized a range of substantially longer combustion residence times to produce char burnout levels from 50% to 100%. The same three coals were tested at 1, 2, and 3 MPa, as well as at 0.2 MPa. Tests were also conducted on Pittsburgh No.8 coal in CO2 entrainment gas at 0.2, 1, and 2 MPa to begin establishing a database of experiments relevant to carbon sequestration techniques. The HPBO test series included use of an impactor-type particle sampler to measure the particle size distribution of fly ash produced under complete burnout conditions. The collected data have been interpreted with the help of CFD and detailed kinetics simulation to extend and validate devolatilization, char combustion and pollutant model at elevated pressure. A global NOX production sub-model has been proposed. The submodel reproduces the performance of the detailed chemical

  16. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    Energy Technology Data Exchange (ETDEWEB)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage

  17. Coal reverse flotation. Part II: Cleaning of a subbituminous coal

    Energy Technology Data Exchange (ETDEWEB)

    Ding, K.J.; Laskowski, J.S. [University of British Columbia, Vancouver, BC (Canada). Dept. for Mining Engineering

    2006-01-15

    Reverse flotation of a subbituminous coal was investigated and it turned out that a large amount of DTAC was needed in this process. The application of the zero-conditioning time method along with the use of PAM significantly reduced DTAC consumption from over 6 kg/t down to 1.375 kg/t. Dextrin was necessary to improve the selectivity. The addition of a dispersant (tannic acid) improved further the quality of concentrate. The concentrate ash content of 16.7% at 50.4% yield was obtained for the feed ash content of 34.6%. Although this gives only about 64% combustible recovery, since the inherent ash content for this coal was determined to be 10% the room for further improvement is very limited. The best separation was obtained around a natural pH of 7.5-8.4 for this coal.

  18. Clean Coal Technology Programs: Completed Projects (Volume 2)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  19. Microbial transformation of coal and coal relevant structures - presentation of a BMBF joint research project

    Energy Technology Data Exchange (ETDEWEB)

    Sinder, C.; Schacht, S.; Pfeifer, F.; Klein, J. [DMT-Gesellschaft fuer Forschung und Pruefung mbH, Essen (Germany)

    1997-12-31

    Investigations in the joint research project `Microbial transformation of coal and coal relevant structures` supported by the Ministry of Education, Science, Research and Technology (BMBF) of the Federal Republic of Germany and coordinated by the DMT-Gesellschaft fuer Forschung und Pruefung mbH (DMT) are focussed on research and development of biotechnological coal conversion processes. Up to now investigations carried out in the project lead to a number of important results. During work on the project a great number of different microorganisms was found able to degrade or solubilize coal or lignite. Enzymatic as well as regulation mechanisms of the microbial depolymerization processes have been characterized successfully. (orig.)

  20. NuCoal CTL wood mountain project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-09-15

    The province of Saskatchewan experienced significant growth between 2005 and 2008. The growing economy included an abundance of different commodities and made Saskatchewan the newest hub for the latest technologies and investment. This report outlined the various opportunities in Saskatchewan for a coal to liquids plant and its technologies. The coal from southern Saskatchewan is generally lignite, which is found in the Ravenscrag Formation near the Big Muddy Badlands. The report discussed the Ravenscrag Formation as well as mining activity that was largely concentrated near Estevan and Bienfait in southeastern Saskatchewan, where Sherritt International operated two surface mines. The Coronach Poplar River Power Station, located 10 kilometres north of the Canada-United States border in southern Saskatchewan was also discussed. Population density, labour, land use, First Nations, and proximity to major centres were factors that were discussed. The programs that were identified included the Saskatchewan immigrant nominee program, an alternative program to the Canadian federal immigration program for those who want to come to Saskatchewan as a permanent resident of Canada; the Weyburn-Midale carbon dioxide project, the world's first carbon dioxide measuring, monitoring and verification initiative; and the Federated Co-op in Regina, a 100,000 barrel/day refinery located close to the Coronach area in Saskatchewan. Political climate, access to the electrical grid, access to water, access to major pipelines, access to rail lines, and access to highways were other topics that were presented. It was concluded that southern Saskatchewan had a broad range of opportunities for a coal to liquids plant. The area has numerous advantages including access to rail and pipelines. refs., tabs., figs., appendices.

  1. Wabash River coal gasification repowering project -- first year operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  2. Abstracts and research accomplishments of university coal research projects

    International Nuclear Information System (INIS)

    1991-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their projects in time for distribution at a grantees conference. This book is a compilation of the material received in response to the request. Abstracts discuss the following area: coal science, coal surface science, reaction chemistry, advanced process concepts, engineering fundamentals and thermodynamics, environmental science

  3. Abstracts and research accomplishments of university coal research projects

    Energy Technology Data Exchange (ETDEWEB)

    1991-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their projects in time for distribution at a grantees conference. This book is a compilation of the material received in response to the request. Abstracts discuss the following area: coal science, coal surface science, reaction chemistry, advanced process concepts, engineering fundamentals and thermodynamics, environmental science.

  4. Carbon burnout project-coal fineness effects

    Energy Technology Data Exchange (ETDEWEB)

    Mike Celechin [Powergen UK plc, Nottingham (United Kingdom)

    2004-02-01

    The aim of this DTI project is to establish good quality plant and rig data to demonstrate the effect of changing coal fineness on carbon burnout in a controlled manner, which can then be used to support computational fluid dynamics (CFD) and engineering models of the process. The modelling elements of the project were completed by Mitsui Babcock Energy Ltd., and validated using the data produced by the other partners. The full scale plant trials were successfully completed at Powergen's Kingsnorth Power Station and a full set of tests were also completed on Powergen's CTF. During these test both carbon-in-ash and NOx levels were seen to increase with increasing fuel particle size. Laboratory analysis of fly ash produced during the plant and rig trials revealed that only small differences in char morphology and reactivity could be detected in samples produced under significantly different operating conditions. Thermo Gravimetric Analysis was also undertaken on a range of PF size fractions collected form mills operating at different conditions. 3 refs., 13 figs., 1 tab.

  5. TJ-II project

    International Nuclear Information System (INIS)

    Alejaldre, C.; Gozalo, J.J.A.; Perez, J.B.; Magaria, F.C.; Diaz, J.R.C.; Perez, J.G.; Lopez-Fraguas, A.; Garcia, L.; Krivenski, V.I.; Martin, R.; Navarro, A.P.; Perea, A.; Rodriguez-Yunta, A.; Ayza, M.S.; Varias, A.

    1990-01-01

    The TJ-II device is a medium-size helical-axis stellarator to be built in Madrid. Its main characteristics are potential for high-beta operation; flexibility, i.e., its rotational transform can be varied over a wide range and its shear to some extent; and bean-shaped plasma cross section. The latest understanding of TJ-II physics in the fields of electron cyclotron resonance heating, transport, and magneto-hydrodynamics, and the engineering solutions introduced in its final design are discussed

  6. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million

  7. Grace announces coal-to-methanol project

    Energy Technology Data Exchange (ETDEWEB)

    Myers, R

    1980-02-15

    WR Grace and Co. are planning a feasibility study for a plant to produce 5000 tons/day of methanol and 6000 tons/day of carbon dioxide from captive coal reserves in Colorado. The study will be performed by Energy Transition Co. (ETCo). The producers would be used for pipeline transmission of pulverised coal, probably to California. At the destination the coal would go to a power station, the methanol to a gas turbine and the carbon dioxide to an oil producer for tertiary recovery.

  8. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW`s Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  9. Healy Clean Coal Project: Healy coal firing at TRW Cleveland Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Koyama, T.; Petrill, E.; Sheppard, D.

    1991-08-01

    A test burn of two Alaskan coals was conducted at TRW's Cleveland test facility in support of the Healy Clean Coal Project, as part of Clean Coal Technology III Program in which a new power plant will be constructed using a TRW Coal Combustion System. This system features ash slagging technology combined with NO{sub x} and SO{sub x} control. The tests, funded by the Alaska Industrial Development and Export Authority (AIDEA) and TRW, were conducted to verify that the candidate Healy station coals could be successfully fired in the TRW coal combustor, to provide data required for scale-up to the utility project size requirements, and to produce sufficient flash-calcined material (FCM) for spray dryer tests to be conducted by Joy/NIRO. The tests demonstrated that both coals are viable candidates for the project, provided the data required for scale-up, and produced the FCM material. This report describes the modifications to the test facility which were required for the test burn, the tests run, and the results of the tests.

  10. Hovdabrekka Project II

    DEFF Research Database (Denmark)

    Hovden, Jan

    2008-01-01

    The Hovdabrekka group is a group of nordic researchers doing survey studies of Nordic journalism schools (2005,2008). This site is dedicated to information from this project. The current members are: Norway: Rune Ottosen,Gunn Bjørnsen and Jan Fredrik Hovden Sweden: Jenny Wiik Denmark: Ida Willig...... and Jannie Møller Hartley. Finland: Henrika Zilliacus-Tikkanen and Raimo Solokangas Former members: Jan Dyberg and Hanne Jørndrup (Denmark), Marina Ghersetti (Sweden) Project Hovdabrekka originated at the Nordic conference for journalist teachers at Hovdabrekka, Iceland September 2004, where a small group...... of scientists/lecturers assembled with a desire to do a comparative quantitative study of students at Nordic journalism schools. Until very recently, there existed little systematic knowledge on the students of journalism in the Nordic countries. For these reasons, the Hovdabrekka group planned and sent out...

  11. Solvent-refined-coal (SRC) process. Volume II. Sections V-XIV. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    This report documents the completion of development work on the Solvent Refined Coal Process by The Pittsburgh and Midway Coal Mining Co. The work was initiated in 1966 under Office of Coal Research, US Department of Interior, Contract No. 14-01-0001-496 and completed under US Department of Energy Contract No. DE-AC05-79ET10104. This report discusses work leading to the development of the SRC-I and SRC-II processes, construction of the Fort Lewis Pilot Plant for the successful development of these processes, and results from the operation of this pilot plant. Process design data generated on a 1 ton-per-day Process Development Unit, bench-scale units and through numerous research projects in support of the design of major demonstration plants are also discussed in summary form and fully referenced in this report.

  12. The Healy Clean Coal Project: Design verification tests

    International Nuclear Information System (INIS)

    Guidetti, R.H.; Sheppard, D.B.; Ubhayakar, S.K.; Weede, J.J.; McCrohan, D.V.; Rosendahl, S.M.

    1993-01-01

    As part of the Healy Clean Coal Project, TRW Inc., the supplier of the advanced slagging coal combustors, has successfully completed design verification tests on the major components of the combustion system at its Southern California test facility. These tests, which included the firing of a full-scale precombustor with a new non-storage direct coal feed system, supported the design of the Healy combustion system and its auxiliaries performed under Phase 1 of the project. Two 350 million BTU/hr combustion systems have been designed and are now ready for fabrication and erection, as part of Phase 2 of the project. These systems, along with a back-end Spray Dryer Absorber system, designed and supplied by Joy Technologies, will be integrated with a Foster Wheeler boiler for the 50 MWe power plant at Healy, Alaska. This paper describes the design verification tests and the current status of the project

  13. The ENCOAL Mild Coal Gasification Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2002-03-15

    This report is a post-project assessment of the ENCOAL{reg_sign} Mild Coal Gasification Project, which was selected under Round III of the U.S. Department of Energy (DOE) Clean Coal Technology (CCT) Demonstration Program. The CCT Demonstration Program is a government and industry cofunded technology development effort to demonstrate a new generation of innovative coal utilization processes in a series of commercial-scale facilities. The ENCOAL{reg_sign} Corporation, a wholly-owned subsidiary of Bluegrass Coal Development Company (formerly SMC Mining Company), which is a subsidiary of Ziegler Coal Holding Company, submitted an application to the DOE in August 1989, soliciting joint funding of the project in the third round of the CCT Program. The project was selected by DOE in December 1989, and the Cooperative Agreement (CA) was approved in September 1990. Construction, commissioning, and start-up of the ENCOAL{reg_sign} mild coal gasification facility was completed in June 1992. In October 1994, ENCOAL{reg_sign} was granted a two-year extension of the CA with the DOE, that carried through to September 17, 1996. ENCOAL{reg_sign} was then granted a six-month, no-cost extension through March 17, 1997. Overall, DOE provided 50 percent of the total project cost of $90,664,000. ENCOAL{reg_sign} operated the 1,000-ton-per-day mild gasification demonstration plant at Triton Coal Company's Buckskin Mine near Gillette, Wyoming, for over four years. The process, using Liquids From Coal (LFC{trademark}) technology originally developed by SMC Mining Company and SGI International, utilizes low-sulfur Powder River Basin (PRB) coal to produce two new fuels, Process-Derived Fuel (PDF{trademark}) and Coal-Derived Liquids (CDL{trademark}). The products, as alternative fuel sources, are capable of significantly lowering current sulfur emissions at industrial and utility boiler sites throughout the nation thus reducing pollutants causing acid rain. In support of this overall

  14. The ENCOAL Mild Coal Gasification Project, A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    This report is a post-project assessment of the ENCOAL(reg s ign) Mild Coal Gasification Project, which was selected under Round III of the U.S. Department of Energy (DOE) Clean Coal Technology (CCT) Demonstration Program. The CCT Demonstration Program is a government and industry cofunded technology development effort to demonstrate a new generation of innovative coal utilization processes in a series of commercial-scale facilities. The ENCOAL(reg s ign) Corporation, a wholly-owned subsidiary of Bluegrass Coal Development Company (formerly SMC Mining Company), which is a subsidiary of Ziegler Coal Holding Company, submitted an application to the DOE in August 1989, soliciting joint funding of the project in the third round of the CCT Program. The project was selected by DOE in December 1989, and the Cooperative Agreement (CA) was approved in September 1990. Construction, commissioning, and start-up of the ENCOAL(reg s ign) mild coal gasification facility was completed in June 1992. In October 1994, ENCOAL(reg s ign) was granted a two-year extension of the CA with the DOE, that carried through to September 17, 1996. ENCOAL(reg s ign) was then granted a six-month, no-cost extension through March 17, 1997. Overall, DOE provided 50 percent of the total project cost of$90,664,000. ENCOAL(reg s ign) operated the 1,000-ton-per-day mild gasification demonstration plant at Triton Coal Company's Buckskin Mine near Gillette, Wyoming, for over four years. The process, using Liquids From Coal (LFC(trademark)) technology originally developed by SMC Mining Company and SGI International, utilizes low-sulfur Powder River Basin (PRB) coal to produce two new fuels, Process-Derived Fuel (PDF(trademark)) and Coal-Derived Liquids (CDL(trademark)). The products, as alternative fuel sources, are capable of significantly lowering current sulfur emissions at industrial and utility boiler sites throughout the nation thus reducing pollutants causing acid rain. In support of this overall

  15. Abstract and research accomplishments of University Coal Research Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Principal Investigators of the grants supported by the University Coal Research Program were requested to submit abstracts and highlight accomplishments of their respective projects in time for distribution at a conference on June 13--14, 1995 at Tennessee State University in Nashville, Tennessee. This book is a compilation of the material received in response to that request. For convenience, the 70 grants reported in this book are stored into eight technical areas, Coal Science, Coal Surface Science, Reaction Chemistry, Advanced Process Concepts, Engineering Fundamentals and Thermodynamics, Environmental Science, high Temperature Phenomena, and Special topics. Indexes are provided for locating projects by subject, principal investigators, and contracting organizations. Each extended abstract describes project objectives, work accomplished, significance to the Fossil Energy Program, and plans for the next year.

  16. Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2002-01-01

    The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December

  17. Wabash River Coal Gasification Combined Cycle Repowering Project: Clean Coal Technology Program

    International Nuclear Information System (INIS)

    1993-05-01

    The proposed project would result in a combined-cycle power plant with lower emissions and higher efficiency than most existing coal-fired power plants of comparable size. The net plant heat rate (energy content of the fuel input per useable electrical generation output; i.e., Btu/kilowatt hour) for the new repowered unit would be a 21% improvement over the existing unit, while reducing SO 2 emissions by greater than 90% and limiting NO x emissions by greater than 85% over that produced by conventional coal-fired boilers. The technology, which relies on gasified coal, is capable of producing as much as 25% more electricity from a given amount of coal than today's conventional coal-burning methods. Besides having the positive environmental benefit of producing less pollutants per unit of power generated, the higher overall efficiency of the proposed CGCC project encourages greater utilization to meet base load requirements in order to realize the associated economic benefits. This greater utilization (i.e., increased capacity factor) of a cleaner operating plant has global environmental benefits in that it is likely that such power would replace power currently being produced by less efficient plants emitting a greater volume of pollutants per unit of power generated

  18. Coal background paper. Coal demand

    International Nuclear Information System (INIS)

    1997-01-01

    Statistical data are presented on coal demands in IEA and OECD member countries and in other countries. Coal coaking and coaking coal consumption data are tabulated, and IEA secretariat's coal demand projections are summarized. Coal supply and production data by countries are given. Finally, coal trade data are presented, broken down for hard coal, steam coal, coking coal (imports and export). (R.P.)

  19. Steam gasification of coal, project prototype plant nuclear process heat

    International Nuclear Information System (INIS)

    Heek, K.H. van

    1982-05-01

    This report describes the tasks, which Bergbau-Forschung has carried out in the field of steam gasification of coal in cooperation with partners and contractors during the reference phase of the project. On the basis of the status achieved to date it can be stated, that the mode of operation of the gas-generator developed including the direct feeding of caking high volatile coal is technically feasible. Moreover through-put can be improved by 65% at minimum by using catalysts. On the whole industrial application of steam gasification - WKV - using nuclear process heat stays attractive compared with other gasification processes. Not only coal is conserved but also the costs of the gas manufactured are favourable. As confirmed by recent economic calculations these are 20 to 25% lower. (orig.) [de

  20. Financing clean coal projects in Eastern Europe

    International Nuclear Information System (INIS)

    Jackson, G.

    1992-01-01

    The Trade and Development Program (TDP), a U.S. Government agency, provides funding for US firms to carry out feasibility studies, consultancies, and other planning services related to major projects in developing countries. By providing assistance in project planning, TDP promotes economic development; at the same time, TDP helps US firms get involved in projects that offer significant export opportunities. TDP has programs throughout the developing world, including Central and Eastern Europe, and has recently been authorized to operate in the Newly Independent States (NIS) of the former Soviet Union. The vast size and population of this region, as well as its tremendous infrastructural and basic industrial needs, present new challenges to TDP. The basic TDP program is described below; it is likely to be modified somewhat to meet the specific requirements of the NIS

  1. Coal Transition in the Czech Republic. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Reckova, Dominika; Recka, Lukacs; Scasny, Milan

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. Content: History of coal production and coal reserves; Key features of the Czech economy; Fuel mix in the Czech Republic 1990 - 2014; Key features of coal sector in the Czech Republic after 1990; The use of coal in the Czech Republic and its possible replacement: A. Coal as source of Electricity, B. Coal as Heating source, C. Non - energy coal use; The state role in the coal sector after 1990 - mining limits; Measures to ease transition: Phasing-out of mining activities, Rehabilitation of environmentally damaged land, Programmes financing the remediation of ecological damage, Remediation of environmental damage caused by mining; Future outlook; Lessons learned; References; Annex

  2. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  3. Coal Transition in the United States. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Kok, Irem

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. Over the past decade, the US started to cut down the production and the use of coal, which was affected by unfavorable market dynamics and changing federal regulatory environment. Even before the shale gas revolution and uptake of renewables diminish the use of coal in power generation, coal communities were struggling to meet ends. The regional cost differences between producing states, such as the Appalachian and the Powder River Basins, indicates that coal-impacted communities and workers have lived through the impacts of coal transition at varying magnitudes and time periods. In the period between 2014 and 2016, we have seen the crash of major US coal companies due to declining demand for US coal domestically and internationally. Furthermore, Obama administration's climate change policies negatively impacted coal-fired power plants with additional GHG emission requirements, contributing to declining domestic demand for coal. Combined with market downturn, US coal producers already struggle to pay for high operational costs and legal liabilities under bankruptcy conditions. With under-funded state budgets, coal states are also grappling with financial exposure resulting from pension, health care and reclamation liabilities of bankrupt coal companies. In 2016, former President Obama announced the Power Plus Plan to aid coal-impacted communities and workers to prepare for a low carbon future. The federal budget plan targeted diversification of local economies, funding of health and pension funds of miners and retraining for

  4. Coal Transition in the Netherlands. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Gales, Ben; Hoelsgens, Rick

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. This document provides on overview of coal transitions in the Netherlands in the post-war period. The main focus is an in depth case study of the reconversion of the Limburg region in the South-east of the country which took place from 1965 to 1990. This is discussed in the first part of the document. The later part of the document discusses the re-emergence of coal as an energy source in the Netherlands and present challenges to phasing out coal use

  5. Lessons from previous 'coal Transitions'. High-level summary for decision-makers, Part of 'Coal Transitions: Research and Dialogue on the Future of Coal' Project

    International Nuclear Information System (INIS)

    Caldecott, Ben; Sartor, Oliver; Spencer, Thomas

    2017-01-01

    The need for a so-called 'just transition' is acknowledged, away from carbon intensive activities, such as coal production and use. But what might a just transition look like in practice? What specific risks need to be managed and what are the best approaches to managing them? There is an urgent need to develop a deeper understanding of these issues. It is to this need that this report tries to respond. It provides a summary of lessons from six historical case studies of regional coal mining transitions that have occurred or are ongoing in Europe and the United States in recent decades. These case studies and this report were developed as part of a broader project led by IDDRI and Climate Strategies, entitled 'Coal Transitions: Research and Dialogue on the Future of Coal'. This project seeks to utilise these historical lessons to facilitate the development of feasible coal transition scenarios in large coal producing countries today'

  6. Japan`s sunshine project. 17.. 1992 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This report describes the achievement of coal liquefaction and gasification technology development in the Sunshine Project for FY 1992. It presents the research and development of coal liquefaction which includes studies on reaction mechanism of coal liquefaction and catalysts for coal liquefaction, the research and development of coal gasification technologies which includes studies on gasification characteristics of various coals and improvement of coal gasification efficiency, the development of bituminous coal liquefaction which includes engineering, construction and operation of a bituminous coal liquefaction pilot plant and research by a process supporting unit (PSU), the development of brown coal liquefaction which includes research on brown coal liquefaction with a pilot plant and development of techniques for upgrading coal oil from brown coal, the development of common base technologies which includes development of slurry letdown valves and study on upgrading technology of coal-derived distillates, the development of coal-based hydrogen production technology with a pilot plant, the development of technology for entrained flow coal gasification, the assessment of coal hydrogasification, and the international co-operation. 4 refs., 125 figs., 39 tabs.

  7. Australia's export coal industry: a project of the Coal Australia Promotion Program. 2. ed.

    International Nuclear Information System (INIS)

    1995-01-01

    This booklet presents an overview of the Australian coal industry, emphasises the advantages of using Australian coal and outlines government policies, both Commonwealth and State, which impact on coal mine development, mine ownership and coal exports. It also provides information on the operations and products of each producer supplying coal and coke to export markets and gives contact details for each. The emphasis is on black coal, but information on coal briquettes and coke is also provided. Basic information on the rail networks used for the haulage of export coal and on each of the bulk coal loading terminals is also included.(Author). 3 figs., photos

  8. Central Arkansas Energy Project. Coal to medium-Btu gas

    Science.gov (United States)

    1982-05-01

    The Central Arkansas Energy Project has as its objective the conversion of coal in a central location to a more readily usable energy source, medium Btu gas (MBG), for use at dispersed locations as fuel for power production and steam generation, or as a feedstock for chemical processing. The project elements consist of a gasification facility to produce MBG from coal, a pipeline to supply the MBG to the dispersed sites. The end of line users investigated were the repowering or refueling of an existing Arkansas Power and Light Co. Generating station, an ammonia plant, and a combined cycle cogeneration facility for the production of steam and electricity. Preliminary design of the gasification plant including process engineering design bases, process flow diagrams, utility requirements, system description, project engineering design, equipment specifications, plot plan and section plot plans, preliminary piping and instrument diagrams, and facilities requirements. Financial analyses and sensitivities are determined. Design and construction schedules and manpower loadings are developed. It is concluded that the project is technically feasible, but the financial soundness is difficult to project due to uncertainty in energy markets of competing fuels.

  9. Coal Calorific Value Prediction Based on Projection Pursuit Principle

    OpenAIRE

    QI Minfang; FU Zhongguang; JING Yuan

    2012-01-01

    The calorific value of coal is an important factor for the economic operation of coal-fired power plant. However, calorific value is tremendous difference between the different coal, and even if coal is from the same mine. Restricted by the coal market, most of coal fired power plants can not burn the designed-coal by now in China. The properties of coal as received are changing so frequently that pulverized coal firing is always with the unexpected condition. Therefore, the researches on the...

  10. Clean coal technology - Study on the pilot project experiment of underground coal gasification

    International Nuclear Information System (INIS)

    Yang Lanhe; Liang Jie; Yu Li

    2003-01-01

    In this paper, the gasification conditions, the gasifier structure, the measuring system and the gasification rationale of a pilot project experiment of underground coal gasification (UCG) in the Liuzhuang Colliery, Tangshan, are illustrated. The technique of two-phase underground coal gasification is proposed. The detection of the moving speed and the length of the gasification working face is made using radon probing technology. An analysis of the experiment results indicates that the output of air gas is 3000 m 3 /h with a heating value of about 4.18 MJ/m 3 , while the output of water gas is 2000 m 3 /h with a heating value of over 11.00 MJ/m 3 , of which H 2 content is above 40% with a maximum of 71.68%. The cyclical time of two-phase underground gasification is 16 h, with 8 h for each phase. This prolongs the time when the high-heating value gas is produced. The moving speed of the gasification working face in two alternative gasifiers is identified, i.e. 0.204 and 0.487 m/d, respectively. The success of the pilot project experiment of the underground gasification reveals the strides that have been made toward the commercialization of the UCG in China. It also further justifies the reasonability and feasibility of the new technology of long channel, big section, two-phase underground gasification. A conclusion is also drawn that the technology of the pilot project experiment can be popularized in old and discarded coal mines

  11. CO2 Capture and Storage in Coal Gasification Projects

    Science.gov (United States)

    Rao, Anand B.; Phadke, Pranav C.

    2017-07-01

    concerns about climate change problem. Carbon Capture and Storage (CCS) is being considered as a promising carbon mitigation technology, especially for large point sources such as coal power plants. Gasification of coal helps in better utilization of this resource offering multiple advantages such as pollution prevention, product flexibility (syngas and hydrogen) and higher efficiency (combined cycle). It also enables the capture of CO2 prior to the combustion, from the fuel gas mixture, at relatively lesser cost as compared to the post-combustion CO2 capture. CCS in gasification projects is considered as a promising technology for cost-effective carbon mitigation. Although many projects (power and non-power) have been announced internationally, very few large-scale projects have actually come up. This paper looks at the various aspects of CCS applications in gasification projects, including the technical feasibility and economic viability and discusses an Indian perspective. Impacts of including CCS in gasification projects (e.g. IGCC plants) have been assessed using a simulation tool. Integrated Environmental Control Model (IECM) - a modelling framework to simulate power plants - has been used to estimate the implications of adding CCS units in IGCC plants, on their performance and costs.

  12. Military Family Coping Project - Phase II

    Science.gov (United States)

    2015-05-01

    Anxiety, Life Satisfaction , Addiction, Trauma 4 The Military Family Coping Project reflects two phases. The first consisted of a series of focus...need for and guided the work of the Military Family Coping Project Phase II funded by TATRC. The Military Family Coping Project Phase II was...solidarity. For the purposes of family functioning analyses, married and unmarried soldiers were analyzed separately because marital status affects

  13. Report on the achievements in the Sunshine Project in fiscal 1987. Surveys on coal selection and coal types (Surveys on coal resources for liquefaction); 1987 nendo tanshu sentei chosa tanshu chosa seika hokokusho. Ekikayo sekitan shigen chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The survey purpose is to identify availability of coal resources for liquefaction in major coal producing countries in the Pacific basin area. Therefore, collection is carried out on such data as coal existing conditions, coal qualities, production quantities, and infrastructures on coal mines being operated and projects under development or investigation. Coal samples are collected in wide range and exhaustively unbiased to particular coal fields and mines to acquire data to perform selection and evaluation of coals that can be fed to coal liquefying plants. The present survey was intended to acquire fundamental data for the liquefying coal selection, such as coal existing conditions, natures, and infrastructures for the coal resources, taking up as the survey object countries the State of Alaska, U.S.A. and Indonesia. The coal types as the object of the survey are mainly sub-bituminous coal, and additionally brown coal and partly bituminous coal. The amount of coal deposit as the subject of the investigation is 100 million tons or more as the verified reserve. The subject areas cover coal mines in the State of Alaska, U.S.A. (Northern Alaska, Nenana, Beluga, and Matanuska coal fields), and Indonesia (the Sumatra and Kalimantan islands). The survey items are made up of 14 items (see the coal mine survey tables in JN0040851). (NEDO)

  14. Converting coal

    Energy Technology Data Exchange (ETDEWEB)

    Avigliano, A. [Bedeschi (Italy)

    2006-10-15

    In September 2005, Bedeschi was commissioned to design and supply a coal unloading, conveying and storage facility for a new raw coal line system within Hatien II Cement Co. The new plant is composed of a grab unloader, a conveyor system, a storage shed with stacking and reclaiming facilities, a complete dedusting system and civil and steel structure engineering. The scope of supply includes a local fabrication portion; however, main components will be imported. The project will be completed in 21 months. The paper looks into the mechanics of loading and unloading coal. 4 figs., 4 photos.

  15. Coal information 1996

    International Nuclear Information System (INIS)

    1997-01-01

    Coal Information (1997 edition) is the latest edition of a publication that has been produced annually by the IEA since 1983. The report is intended to provide both Member countries of the OECD and those employed in all sectors of the coal industry with information on current world coal market trends and long-term prospects. It includes information on coal prices, demand, trade, supply, production capacity, transport, environmental issues (including emission standards for coal-fired boilers), coal ports, coal-fired power stations and coal used in non -OECD countries. Part I of the publication contains a wide ranging review of world coal market developments in 1996 and current prospects to 2010. The review is based on historical data of OECD energy supply and demand, data on other world regions, projections of OECD coal supply, demand and trade and information provided by the CIAB. Part II provides, in tabular and graphical form, a more detailed and comprehensive statistical picture of coal developments and future prospects for coal in the OECD, by region and for individual Member countries. Readers interested in projections are strongly advised to read the notes for individual countries in Principles and Definitions in Part II. Coal statistics for non-OECD countries are presented in Part III of the book. Summary data are available on hard coal supply and end-use statistics for about 40 countries and regions world-wide. Data are based on official national submissions to the United Nations in Geneva and New York, national energy publications, information provided to the IEA Secretariat by national statistical offices as well as other unofficial Secretariat sources. Further information on coal used in non-OECD countries is published annually by the IEA in Energy Statistics and Balances of Non-OECD Countries. Also included in Part III are the Survey of Coal Ports world-wide and the Survey of Coal-fired Power Stations in coal-importing countries

  16. Measurement and modeling of advanced coal conversion processes, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Solomon, P.R.; Serio, M.A.; Hamblen, D.G. [and others

    1993-06-01

    A two dimensional, steady-state model for describing a variety of reactive and nonreactive flows, including pulverized coal combustion and gasification, is presented. The model, referred to as 93-PCGC-2 is applicable to cylindrical, axi-symmetric systems. Turbulence is accounted for in both the fluid mechanics equations and the combustion scheme. Radiation from gases, walls, and particles is taken into account using a discrete ordinates method. The particle phase is modeled in a lagrangian framework, such that mean paths of particle groups are followed. A new coal-general devolatilization submodel (FG-DVC) with coal swelling and char reactivity submodels has been added.

  17. Socio-economic impacts - an overview based on coal mining projects

    International Nuclear Information System (INIS)

    Singh, V.K.

    1994-01-01

    Socio-economic impacts of coal projects have assumed importance as new projects are affecting tribal/underdeveloped areas. The paper highlights the impacts on land uses and on life and culture of the habitats. It assesses socio-economic impacts and furnishes financial implications of rehabilitation. Some suggestions have also been given to neutralize the stresses developed due to development of coal fields

  18. Coal Transition in the United Kingdom. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Fothergill, Steve

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. The UK has virtually completed its move away from the production and use of coal - an astonishing transformation for an economy that once relied overwhelmingly on coal power. This is however a transformation that was never really 'planned' and the move away from coal started long before concerns about climate change achieved political prominence. Until as late as November 2015, for example, there was no government commitment to phase out coal in UK electricity generation. But it was already happening, and some of the most rapid change was actually in 2016, triggered in particular by the impact of a 'carbon tax' which has tipped the economics away from coal to gas-fired generation. A handful of coal-fired power stations will remain on the grid for a few years to help meet peak demand, but to all intents the UK is already entering the post-coal era. Whether this has been achieved without undue pain to coal mining areas is however deeply questionable. Job losses were for many years managed by a combination of redundancies and transfers to surviving mines. Redundancy payments, welfare benefits and early access to pensions provided support former miners, and careers advice and training was on offer. Most former miners have now reached retirement age. The big problem for mining communities has been replacement of the lost jobs. The UK has a long history of efforts to regenerate areas affected by coal closures and there is clear evidence that this has delivered positive results in the form of new jobs. Nevertheless, there continues to

  19. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  20. Project Final Report: HPC-Colony II

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Terry R [ORNL; Kale, Laxmikant V [University of Illinois, Urbana-Champaign; Moreira, Jose [IBM T. J. Watson Research Center

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  1. Coal

    International Nuclear Information System (INIS)

    Teissie, J.; Bourgogne, D. de; Bautin, F.

    2001-12-01

    Coal world production represents 3.5 billions of tons, plus 900 millions of tons of lignite. 50% of coal is used for power generation, 16% by steel making industry, 5% by cement plants, and 29% for space heating and by other industries like carbo-chemistry. Coal reserves are enormous, about 1000 billions of tons (i.e. 250 years of consumption with the present day rate) but their exploitation will be in competition with less costly and less polluting energy sources. This documents treats of all aspects of coal: origin, composition, calorific value, classification, resources, reserves, production, international trade, sectoral consumption, cost, retail price, safety aspects of coal mining, environmental impacts (solid and gaseous effluents), different technologies of coal-fired power plants and their relative efficiency, alternative solutions for the recovery of coal energy (fuel cells, liquefaction). (J.S.)

  2. Coal Transition in Poland. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Szpor, Aleksander

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. The restructuring of the Polish coal sector is inextricably related to the democratic transformation which began in 1989. The economic dimension of the transformation is manifested in the shift from central planning to the free market. Although this process brought economic growth, it has had severe social costs. The main goals of the coal sector restructuring were to achieve its profitability and competitiveness on the global market. However, even with a very quick down-sizing of production and employment, which positively affected the mines' productivity, these goals were not achieved. Neither the profitability of the sector nor the sustainability of the labour restructuring were achieved. There were three main reasons for lack of success in this process. Firstly, the rapid changes of governments making impossible implementation of long term strategies and ensure implementation of market rules in the sector. Secondly, the pressure from trade unions on sustaining the status quo - state owed structure of mining companies, professional privileges and increasing salaries. Thirdly, the lack of sufficient incentives for retraining the miners and revitalising the areas exposed the most on the coal sector restructuring. Content: Introduction; Historical background; Structure of the coal and energy sector; Policies for the restructuring of the coal sector: Main actors in the process, Governmental programs, Instruments for easing the restructuring processes; Conclusions and lessons learnt

  3. Technical project of complex fast cycle heat treatment of hydrogenous coal preparation

    OpenAIRE

    Moiseev, V. A.; Andrienko, V. G.; Pileckij, V. G.; Urvancev, A. I.; Gvozdyakov, Dmitry Vasilievich; Gubin, Vladimir Evgenievich; Matveev, Aleksandr Sergeevich; Savostiyanova, Ludmila Viktorovna

    2015-01-01

    Problems of heat-treated milled hydrogenous coal preparation site creation in leading fast cycle heat treatment complex were considered. Conditions for effective use of electrostatic methods of heat-treated milled hydrogenous coal preparation were set. Technical project of heat treatment of milled hydrogenous coal preparation site was developed including coupling of working equipment complex on fast heat treatment and experimental samples of equipment being designed for manufacturing. It was ...

  4. The Sudbury Neutrino Observatory project and the Kamiokande II project

    International Nuclear Information System (INIS)

    Beier, E.W.

    1991-01-01

    This document is a technical progress report on work performed at the University of Pennsylvania during the current year on the Sudbury Neutrino Observatory project and on the Kamiokande II project. The motivation for both experiments is the measurement of neutrinos emitted by the sun. The Kamiokande II experiment was an adaptation of an existing nucleon decay detector located in Japan to search for neutrinos emitted by the sun. It has been operational since 1986. Data taking was concluded in 1990 and work will terminate at the end of this grant year. The topics discussed in this report are: the Sudbury Neutrino Observatory project; photomultiplier tube measurements; photomultiplier bases; signal processing electronics; electronics system issues; software management and development; and Kamiokande II

  5. Port projects put on hold as coal imports peak

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-15

    UK ports and rail operators have invested heavily to improve available capacity, but now imports are leveling off. In January to May 2007, UK coal imports totalled 19.2 mt, a drop of 6% compared to the same period in 2006. Indigenous production dropped more drastically, 23.8% to 6.62 mt. UK coal demand will be determined by such factors as the Large Combustion Plant Directive. There appears to be a second wave in the 'dash for gas' generation game as gas prices have fallen. Investment at Immingham's terminal has enabled the UK to cope with increased coal imports. ABP is now considering another coal terminal outside the locks at Hull. These plans are outlined in the article. Coal handling at Newcastle is also reported. 3 figs., 1 photos.

  6. Health Activities Project (HAP), Trial Edition II.

    Science.gov (United States)

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) trial edition (set II) are a teacher information folio and numerous student activity folios which center around the idea that students in grades 5-8 can control their own health and safety. Each student folio is organized into a Synopsis, Health Background, Materials, Setting Up, and Activities…

  7. Coal-fired MHD combustor development project: Phase 3D

    Science.gov (United States)

    1985-05-01

    This fourth quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase 3D) presents the accomplishments during the period February 1 to April 30, 1985. The scope of work covered by this quarterly report encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, assembly and checkout of first and second stage hardware, second stage design verification testing, designs for a continuous slag rejector and low preheat inlet section, and planning for power train testing. Progress includes the following: assembly and checkout of the second first stage, two second stages, and PEM was completed and the hardware was shipped to CDIF and FETS; integration of first and second stage hardware on the FETS Cell No. 2 test stand was completed, cold flow functional tests were performed, and hot fire checkout testing was initiated; assembly of the continuous slag rejector test set-up was 70% completed; the low preheat air inlet section Preliminary Design Review was held (work on the detail design was initiated and is 85% complete); and the Users' Manual was updated to include material for the second stage and final revisions to the power train test plan were made.

  8. Dustfall design of open coal yard in the power plant-a case study on the closed reconstruction project of coal storage yard in shengli power plant

    Science.gov (United States)

    Wang, Kunpeng; Ji, Weidong; Zhang, Feifei; Yu, Wei; Zheng, Runqing

    2018-02-01

    This thesis, based on the closed reconstruction project of the coal storage yard of Shengli Power Plant which is affiliated to Sinopec Shengli Petroleum Administration, first makes an analysis on the significance of current dustfall reconstruction of open coal yard, then summarizes the methods widely adopted in the dustfall of large-scale open coal storage yard of current thermal power plant as well as their advantages and disadvantages, and finally focuses on this project, aiming at providing some reference and assistance to the future closed reconstruction project of open coal storage yard in thermal power plant.

  9. Energy saving and emission reduction: A project of coal-resource integration in Shanxi Province, China

    International Nuclear Information System (INIS)

    Zhang Jianjun; Fu Meichen; Geng Yuhuan; Tao Jin

    2011-01-01

    The small or middle coal mines with illegal operations in developing countries or regions can cause bad energy waste and environmental disruption. The project of coal-resource integration in Shanxi Province of China gives a new idea or an approach to energy saving and emission reduction. It is a social- and economic-ecological project. The paper shows the targets of energy saving and emission reduction in Shanxi Province, and analyses the aims, significance, design process and implementation of the integration project. Based on that, the paper discusses the challenges and opportunities the project brings. The analysis shows that the project of coal-resource integration in developing countries or regions can effectively improve mining technologies, collect capital and impel international cooperation and exchange. Finally, the paper analyses the concerns about the future, including the possible problems of implementation period, industrial updating, environmental impact and re-employment. However, the successful integration of coal resources can mitigate energy crisis and climate crisis and promote cleaner production effectively. - Highlights: → Coal-resource integration gives a new idea or an approach to energy saving and emission reduction. → Coal-resource integration mitigates climate crisis and promotes cleaner production. → Coal-resource integration brings challenges and opportunities to traditional mining industries.

  10. Indirect coal liquefaction - the first commercial CTL project in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, K.; Battensby, D.; Marsico, C.; Hooper, M.; Mather, C. [Uhde GmbH (Germany)

    2006-07-01

    The polygeneration of fuels, chemical and power offers an innovative and economically advantageous way to utilise disadvantaged fuels, such as lignite, waste coal and petroleum coke, in a coal-to-liquids (CTL) plant by means of integration of three main process blocks: gasification island to convert coal into clean synthesis gas; Fischer-Tropsch synthesis to convert synthesis gas into clean liquid fuels and chemicals; and combustion of synthesis gas to produce electric power and steam. This paper describes the process and technology side of this indirect coal liquefaction project with key plant data that has been elaborated for a commercial scale CTL project, which is expected to be the first CTL plant in the USA. The plant will use the Shell Coal Gasification process. 6 figs.

  11. Chiyoda Thoroughbred CT-121 clean coal project at Georgia Power`s Plant Yates

    Energy Technology Data Exchange (ETDEWEB)

    Burford, D.P. [Southern Company Services, Inc., Birmingham, AL (United States)

    1997-12-31

    The Chiyoda Thoroughbred CT-121 flue gas desulfurization (FGD) process at Georgia Power`s Plant Yates completed a two year demonstration of its capabilities in late 1994 under both high- and low-particulate loading conditions. This $43 million demonstration was co-funded by Southern Company, the Electric Power Research Institute and the DOE under the auspices of the US Department of Energy`s Round II Innovative Clean Coal Technology (ICCT) program. The focus of the Yates Project was to demonstrate several cost-saving modifications to Chiyoda`s already efficient CT-121 process. These modifications included: the extensive use of fiberglass reinforced plastics (FRP) in the construction of the scrubber vessel and other associated vessels, the elimination of flue gas reheat through the use of an FRP wet chimney, and reliable operation without a spare absorber module. This paper focuses on the testing results from the last trimester of the second phase of testing (high-ash loading). Specifically, operation under elevated ash loading conditions, the effects of low- and high-sulfur coal, air toxics verification testing results and unexpected improvements in byproduct gypsum quality are discussed.

  12. Proceedings of the advanced coal-fired power systems `95 review meeting, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, H.M.; Mollot, D.J.; Venkataraman, V.K.

    1995-06-01

    This report contains papers which were presented at the advanced coal-fired power sytems review meeting. This is volume II. Topics include: hot gas filter issues, hazardous air pollutants, sorbent development, and separation technologies. Individual papers were processed separately for the United States Department of Energy databases.

  13. Evaluation of the effect of coal cleaning of fugitive elements. Part II. Analytical methods. Final report, Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Bosshart, R.E.; Price, A.A.; Ford, C.T.

    1980-03-01

    This report contains the analytical and test methods which were used routinely at Bituminous Coal Research, Inc. during the project. The procedures contained herein should aid coal industry laboratories and others, including commercial laboratories, who might be required to determine trace elements in coal. Some of the procedures have been presented in previous BCR reports; however, this report includes additional procedures which are described in greater detail. Also presented are many as the more basic coal methods which have been in use at BCR for many years, or which have been adapted or refined from other standard reference sources for coal and water. The basis for choosing specific analytical procedures for trace elements in coal is somewhat complex. At BCR, atomic absorption was selected as the basic method in the development of these procedures. The choice was based on sensitivity, selectivity, accuracy, precision, practicability, and economy. Whenever possible, the methods developed had to be both adequate and amenable for use by coal industry laboratories by virtue of relative simplicity and cost. This is not to imply that the methods described are simple or inexpensive; however, atomic abosrption techniques do meet these criteria in relation to more complex and costly methods such as neutron activation, mass spectrometry, and x-ray fluorescence, some of which require highly specialized personnel as well as access to sophisticated nuclear and computational facilities. Many of the analytical procedures for trace elements in coal have been developed or adapted specifically for the BCR studies. Their presentation is the principal purpose of this report.

  14. Japan`s New Sunshine Project. 20. 1995 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The paper described a summary of the 1995 study on coal liquefaction and gasification under the New Sunshine Project. As for coal liquefaction, a study was made of liquefaction characteristics and catalysts of various coals. Also studied were liquefaction conditions for quality improvement of liquefaction products, an evaluation method of quality of coal liquid, and a utilization method of coal liquid. In order to prevent carbonization and realize effective liquefaction, a study was conducted for elucidation of the reaction mechanism of high pressure hydrogenation. In a 150t/d pilot plant using hydrogen transfer hydrogenation solvents, the NEDOL method was studied using various catalysts and kinds of coals. This is a step prior to data acquisition for engineering, actual construction of equipment and operation. A 1t/d process supporting unit is a unit to support it. The unit conducts studies on slurry letdown valves and synthetic iron sulfide catalysts, screening of Chinese coals, etc. As to coal gasification, the paper added to the basic research the combined cycle power generation using entrained flow coal gasification for improvement of thermal efficiency and environmental acceptability and the HYCOL method for hydrogen production. 68 refs., 40 figs.

  15. FY 2000 report on the results of the project supplementary to the New Sunshine Project - Feasibility of coal hydrogasification technology in China. II - Final report. Investigational study of the social adaptability (Feasibility study of the international cooperation - Report of Beijing Research Institute of Coal Chemistry); 2000 nendo New Sunshine keikaku hojo jigyo (Bessatsu kokusai kyoryoku kanosei chosa Pekin Bai kagaku kenkyujo) hokokusho. Sekitan suiso tenka gaska gijutsu kaihatsu - Shakai tekigo sei ni kansuru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of establishing the coal hydrogasification technology which has a possibility of producing high-quality substitute natural gas in quantity and at low cost, an investigational study of the social adaptability was made. In this fiscal year, the following were carried out: natural gas resource and the plan for the use in China, actual state of the town gas business and the future plan, etc. As a part of the study, Beijing Research Institute of Coal Chemistry, China Coal Research Institute, made a survey under the research contract. As a result of the survey, the following was found out: In Xinjiang and Urumchi, Uigur Autonomous Region, there is an abundant coal resource that is suitable for coal hydrogasification, the transportation pipeline of natural gas had been constructed, and public facilities are prepared, and therefore, both cities are suitable for the construction of coal hydrogasification plant. Datong, Shanxi Province, is a largest city of coal production, enables the long-term coal supply for coal hydrogasification, and has a plan for remodeling of old facilities and construction of new facilities for the introduction of natural gas, and therefore, the city is suitable for the construction of coal hydrogasification plant. (NEDO)

  16. FY 2001 report on the coal engineer training project. Advanced course; 2001 nendo sekitan gijutsusha yose jigyo. Jokyu kosu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    The paper summed up the details of the training in the coal engineer training project (advanced course) carried out in FY 2001. The term of training was from June 1 to November 14, 2001. In the business training, lectures were given on coal geology, coal exploration technology, coal mining technology, draft survey, coal sampling and analysis method, maritime freight transport mainly of coal, coal utilization technology, environmental protection technology related to coal utilization, projects on overseas coal development, physical properties/chemical characteristics and usage of coal, and coal situation in China. In the inspection training, inspectional visits were paid to Taiheiyo Coal Mining Co., Noshiro Power Plant of the Tohoku Electric Power Co., Kumagaya Plant of Taiheiyo Cement Corp. and Keihin Steelworks of NKK Corp. In the training overseas, inspectional visits were paid to the following in Australia: coal mines of Moonee, Rix's Creek, West Wallsend, Bloomfield, Beltana, Bulga, South Bulga, Mt. Thorley, Warkworth, Liddell, Wambo, Mount Owen, Camberwell, etc. and harbors of Port Newcastle, Port Kembla Coal Terminal, etc. (NEDO)

  17. Interim report on Tanjung Enim IV coal exploration project. South Arahan area (1998/1999)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The exploration project in Indonesia covered geological mapping, drilling, geophysical logging, underground water pumping tests, vertical seismic profiling (VSP), and seismic reflection survey. Ten boreholes were drilled. Moreover, coal property analysis, geotechnical rock test, geochemical analysis, and the like were conducted by examining core specimens sampled from the boreholes. It was found that there are three main coal beds which continuously extend to the two ends of the synclinic structure. It was also found that there is a 6m-thick coal bed 200m further below the three main coal beds, and it is estimated to produce approximately 6,000kcal/kg. Coal from two of the three beds produces 5,000kcal/kg, containing but a little ash and sulfur. Coal from the third includes 1.17% of sulfur. Coal in all the beds is summed up, and then it is estimated that there is approximately 1,054-million tons of coal in reserve in the South Arahan area. (NEDO)

  18. Coal Transition in Spain. An historical case study for the project 'Coal Transitions: Research and Dialogue on the Future of Coal'

    International Nuclear Information System (INIS)

    Del Rio, Pablo

    2017-01-01

    This is one of the 6 country case-studies commissioned to collect experience on past coal transitions. The 6 countries are: Czech Republic, the Netherlands, Poland, Spain, UK, USA. Their role in the Coal Transitions project was to provide background information for a Synthesis Report for decision makers, and provide general lessons for national project teams to take into account in developing their coal transitions pathways for the future. Spain has had a long tradition of coal mining at least since the 18. century. However, it is also one of the jurisdictions committing to phase-out of subsidies and implementing it in recent times. This case study discusses the main features of the coal transition in Spain, the factors influencing this transition as well as the policies which both drove it and accompanied their detrimental socioeconomic effects on the workers and regions. The analysis is based on a desktop research of relevant documents, including official communications from the Ministry of Industry (MINETUR) and the European Commission as well as statements of position from the industry association (CARBUNION) and labour unions (UGT and CCOO). Documents on national coal from other institutions (Foundations, NGOs) have also been consulted. Finally, an analysis of articles in the mass media has been carried out. This contains useful statements from different types of stakeholders. A strong reduction in production and employment in the coal industry has been experienced at least in the last two decades in this country. Successive plans by the government have aimed at reducing coal production, early retirement of workers and closing mines. Caught in the middle of the mining coalition on the one hand and EU legislation and public opinion on the other, the government has had to approve drastic measures leading to phase out. On the other hand, it has tried to accompany the phase out with measures which have tried to mitigate the negative impact on the affected zones

  19. Status of the FRM-II project

    International Nuclear Information System (INIS)

    Boening, K.

    1994-01-01

    The new research reactor FRM-II at Garching near Munich is planned to become a high performance source of slow neutrons in Germany. Its design concept provides for a very compact reactor core cooled by light water and placed within a heavy water moderator tank, where a high thermal neutron flux will be obtained at only 20 MW power. - This paper begins with an overview over some of the essential design features and some more recent design modifications. It then reports on the status of the project, the most important event being a positive decision which the Bavarian State Government has made in January 1993 and which represented a green light for the project to enter the next project phase. Consequently, two official requests have been made by the Technical University of Munich, one for the nuclear licensing of the facility and the other for the so called 'Raumordnungsverfahren'. In this context the final version of the FRM-II safety report has been submitted to the nuclear licensing authority. (author)

  20. Final project report: TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1993-02-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project including, Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 M 3 of mixed waste

  1. Final project report, TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1992-01-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project, including Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 m 3 of low-level solid radioactive waste and 5 m 3 of mixed waste

  2. Combined Final Report for Colony II Project

    Energy Technology Data Exchange (ETDEWEB)

    Kale, Laxmikant [University of Illinois; Jones, Terry [Oak Ridge National Laboratory; Moreira, Jose [IBM Corp.

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the results obtained over the performance period of the project.

  3. Task 27 -- Alaskan low-rank coal-water fuel demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    Development of coal-water-fuel (CWF) technology has to-date been predicated on the use of high-rank bituminous coal only, and until now the high inherent moisture content of low-rank coal has precluded its use for CWF production. The unique feature of the Alaskan project is the integration of hot-water-drying (HWD) into CWF technology as a beneficiation process. Hot-water-drying is an EERC developed technology unavailable to the competition that allows the range of CWF feedstock to be extended to low-rank coals. The primary objective of the Alaskan Project, is to promote interest in the CWF marketplace by demonstrating the commercial viability of low-rank coal-water-fuel (LRCWF). While commercialization plans cannot be finalized until the implementation and results of the Alaskan LRCWF Project are known and evaluated, this report has been prepared to specifically address issues concerning business objectives for the project, and outline a market development plan for meeting those objectives.

  4. Environmental Assessment for Lignite Fuel Enhancement Project, Coal Creek Station, Great River Energy, Underwood, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-01-16

    The US Department of Energy (DOE) has prepared this EA to assess the environmental impacts of the commercial application of lignite fuel enhancement. The proposed demonstration project would be implemented at Great River Energy's Coal Creek Station near Underwood, North Dakota. The proposed project would demonstrate a technology to increase the heating value of lignite and other high-moisture coals by reducing the moisture in the fuels. Waste heat that would normally be sent to the cooling towers would be used to drive off a percentage of the moisture contained within the lignite. Application of this technology would be expected to boost power-generating efficiencies, provide economic cost savings for lignite and sub-bituminous power plants, and reduce air emissions. The proposed project would be constructed on a previously disturbed site within the Coal Creek Station and no negative impacts would occur in any environmental resource area.

  5. Project Monitor: Part II. Conservation in small business: an exploratory study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, P Y

    1979-08-01

    Project Monitor examined the energy conservation attitude and behavior of small samples of small business owners/operators in Allegheny County, Pennsylvania, focusing on manufacturing concerns and retailers. Section I reports the findings on the energy conserving behavior of 92 smaller manufacturers and Section II identifies the factors which affect decision making concerning energy consuming activities by the owners/operators of 94 small retail establishments. In each, the impact of Project Pacesetter and of the coal strike and the general energy situation is considered. (MCW)

  6. Area 3, SRC-II coal slurry preheater studies report for the technical data analysis program

    Energy Technology Data Exchange (ETDEWEB)

    1984-08-01

    This report reviews the raw data gathered from the Preheater B test runs at Ft. Lewis, and also the Preheater B results presented in the Solvent Refined Coal (SRC) Process Final Report, Volumes 1 and 2 of Slurry Preheater Design, SRC-II Process and the Ft. Lewis Slurry Preheater Data Analysis, 1 1/2 Inch Coil by Gulf Science and Technology Corporation of Pittsburgh, Pennsylvania. attempts were made to correlate several variables not previously considered with slurry viscosity and thermal conductivity. Only partial success was realized. However, in the process of attempting to correlate these variables an understanding of why some variables could not be correlated was achieved. An attempt was also made, using multiple linear regression, to correlate coal slurry viscosity and thermal conductivity with several independent variables among which were temperature, coal concentration, total solids, coal type, slurry residence time, shear rate, and unit size. The final correlations included some, but not all, of these independent variables. This report is not a stand alone document and should be considered a supplement to work already done. It should be read in conjunction with the reports referenced above.

  7. Scrubbing King Coal's dirty face : a new gasification project southeast of Edmonton hopes to make coal cleaner now and for future generations

    Energy Technology Data Exchange (ETDEWEB)

    Collison, M.

    2008-01-15

    This article described the proposed Dodds-Roundhill Coal Gasification Project. This first commercial coal gasification plant in Canada will be developed by Edmonton-based Sherritt International Corporation, in a 50/50 partnership with the Ontario Teachers' Pension Plan. The project will include a surface coal mine and a coal gasification facility located approximately 80 km southeast of Edmonton, Alberta. Coal gasification is emerging as a clean alternative for converting coal into energy products. It involves the gasification process which breaks down coal to produce hydrogen, carbon monoxide and carbon dioxide, collectively known as synthesis gas (syngas). The syngas can then be used for fuel, as a petrochemical feedstock, or it can be further processed into hydrogen for use by bitumen upgraders and crude oil refineries in Alberta. Carbon dioxide, which is highly concentrated are relatively easy to capture will be either sequestered or used in enhanced oil recovery. Construction will begin in mid-2009 following project application and an environmental impact assessment. 3 figs.

  8. Performance improvement with ISO 9001:2000: a case of PKOC-II project

    Energy Technology Data Exchange (ETDEWEB)

    Behera, U.K.; Prasad, K.S.N. [Singareni Collieries Co. Ltd. (India)

    2006-07-01

    The present study is limited to the study of main step towards ISO 9001:2000 (QMS) development, implementation and improvements of PKOC-II project and the same are discussed. In line with increasing global concern for quality, environmental protection and occupational health and safety, Singareni Collieries Co. Ltd (SCCL) has taken the strategic decision to implement ISO 9001:2000 (QMS), ISO 14001:2004 EMS (environmental management system) and occupational health and safety assessment series 18001:1999 (OHSAS) at the PK OC-II project. This is the first project to implement all three management systems QMS, OHSAS, and EMS, in the Indian coal industry. 25 refs., 12 figs., 2 tabs.

  9. Fractional distillation as a strategy for reducing the genotoxic potential of SRC-II coal liquids: a status report

    Energy Technology Data Exchange (ETDEWEB)

    Pelroy, R.A.; Wilson, B.W.

    1981-09-01

    This report presents results of studies on the effects of fractional distillation on the genotoxic potential of Solvent Refined Coal (SRC-II) liquids. SRC-II source materials and distilled liquids were provided by Pittsburg and Midway Coal Mining Co. Fractional distillations were conducted on products from the P-99 process development unit operating under conditions approximating those anticipated at the SRC-II demonstration facility. Distillation cuts were subjected to chemical fractionation, in vitro bioassay and initial chemical analysis. Findings are discussed as they relate to the temperature at which various distillate cuts were produced. This document is the first of two status reports scheduled for 1981 describing these studies.

  10. HORIZON 2020 - Project SITEX-II

    International Nuclear Information System (INIS)

    Nachmilner, L.

    2016-01-01

    In the mid of 2015 a coordination action SITEX-II was initiated within the EC programme Horizon 2020. It aims at implementing in practice activities along with the interaction models issued by the SITEX project (carried out within FP7 programme in 2012-13), in view of developing an Expertise function network. This network is expected to ensure sustainable capacity of developing and coordination joint and harmonised activities related to the independent technical expertise in the field of safety of deep geological disposal of radioactive waste. SITEX-II tasks include: • The definition of the Strategic Research Agenda (SRA) based on the common R orientations defined by SITEX, the definition of ToR for the implementation of specific topics of from the SRA, and the interaction with IGD-TP and other external entities mandated to implement research on radioactive waste disposal regarding the potential setting up of a respective European Joint Programming; • The production of a guidance on the technical review of the safety case at its different phases of development, fostering a common understanding on the interpretation and proper implementation of safety requirements for developing, operating and closing a geological repository and on then verification of compliance with these requirements; • The commitment of a Civil Society (CS) in the definition of the SRA mentioned above, considering the expectations and technical questions to be considered when developing R for the purpose of Expert function. Close interactions between experts conducting the review work and CS representatives will enhance establishing the safety culture and, more globally, proposing governance patterns with CS in the framework of geological disposal; • The preparation of the ‚administrative‘ framework for creating a sustainable network of Technical Safety Organisations from EU members states by addressing the legal organisational and management aspects. (author)

  11. PULSE COMBUSTOR DESIGN QUALIFICATION TEST AND CLEAN COAL FEEDSTOCK TEST - VOLUME I AND VOLUME II; FINAL

    International Nuclear Information System (INIS)

    Unknown

    2002-01-01

    For this Cooperative Agreement, the pulse heater module is the technology envelope for an indirectly heated steam reformer. The field of use of the steam reformer pursuant to this Cooperative Agreement with DOE is for the processing of sub-bituminous coals and lignite. The main focus is the mild gasification of such coals for the generation of both fuel gas and char-for the steel industry is the main focus. An alternate market application for the substitution of metallurgical coke is also presented. This project was devoted to qualification of a 253-tube pulse heater module. This module was designed, fabricated, installed, instrumented and tested in a fluidized bed test facility. Several test campaigns were conducted. This larger heater is a 3.5 times scale-up of the previous pulse heaters that had 72 tubes each. The smaller heater has been part of previous pilot field testing of the steam reformer at New Bern, North Carolina. The project also included collection and reduction of mild gasification process data from operation of the process development unit (PDU). The operation of the PDU was aimed at conditions required to produce char (and gas) for the Northshore Steel Operations. Northshore Steel supplied the coal for the process unit tests

  12. PULSE COMBUSTOR DESIGN QUALIFICATION TEST AND CLEAN COAL FEEDSTOCK TEST - VOLUME I AND VOLUME II

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2002-02-08

    For this Cooperative Agreement, the pulse heater module is the technology envelope for an indirectly heated steam reformer. The field of use of the steam reformer pursuant to this Cooperative Agreement with DOE is for the processing of sub-bituminous coals and lignite. The main focus is the mild gasification of such coals for the generation of both fuel gas and char--for the steel industry is the main focus. An alternate market application for the substitution of metallurgical coke is also presented. This project was devoted to qualification of a 253-tube pulse heater module. This module was designed, fabricated, installed, instrumented and tested in a fluidized bed test facility. Several test campaigns were conducted. This larger heater is a 3.5 times scale-up of the previous pulse heaters that had 72 tubes each. The smaller heater has been part of previous pilot field testing of the steam reformer at New Bern, North Carolina. The project also included collection and reduction of mild gasification process data from operation of the process development unit (PDU). The operation of the PDU was aimed at conditions required to produce char (and gas) for the Northshore Steel Operations. Northshore Steel supplied the coal for the process unit tests.

  13. Environmental control implications of generating electric power from coal. Technology status report. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-12-01

    This is the first in a series of reports evaluating environmental control technologies applicable to the coal-to-electricity process. The technologies are described and evaluated from an engineering and cost perspective based upon the best available information obtained from utility experience and development work in progress. Environmental control regulations and the health effects of pollutants are also reviewed. Emphasis is placed primarily upon technologies that are now in use. For SO/sub 2/ control, these include the use of low sulfur coal, cleaned coal, or flue-gas desulfurization systems. Electrostatic precipitators and fabric filters used for the control of particulate matter are analyzed, and combustion modifications for NO/sub x/ control are described. In each area, advanced technologies still in the development stage are described briefly and evaluated on the basis of current knowledge. Fluidized-bed combustion (FBC) is a near-term technology that is discussed extensively in the report. The potential for control of SO/sub 2/ and NO/sub x/ emissions by use of FBC is analyzed, as are the resulting solid waste disposal problems, cost estimates, and its potential applicability to electric utility systems. Volume II presents the detailed technology analyses complete with reference citations. This same material is given in condensed form in Volume I without references. A brief executive summary is also given in Volume I.

  14. Preparation and Evaluation of Adsorbents from Coal and Irvingia gabonensis Seed Shell for the Removal of Cd(II and Pb(II Ions from Aqueous Solutions

    Directory of Open Access Journals (Sweden)

    Mercy A. Ezeokonkwo

    2018-01-01

    Full Text Available Cd(II and Pb(II ions removal using adsorbents prepared from sub-bituminous coal, lignite, and a blend of coal and Irvingia gabonensis seed shells was investigated. Fourier transform infrared, scanning electron microscope and X-ray fluorescence analyses implicated hydroxyl, carbonyl, Al2O3, and SiO2 as being responsible for attaching the metal ions on the porous adsorbents. The optimum adsorption of carbonized lignite for the uptake of Cd(II and Pb(II ions from aqueous media were 80.93 and 87.85%, respectively. Batch adsorption was done by effect of adsorbent dosage, pH, contact time, temperature, particle size, and initial concentration. Equilibrium for the removal of Pb(II and Cd(II was established within 100 and 120 min respectively. Blending the lignite-derived adsorbent with I. gabonensis seed shell improved the performance significantly. More improvement was observed on modification of the blend using NaOH and H3PO4. Pb(II was preferentially adsorbed than Cd(II in all cases. Adsorption of Cd(II and Pb(II ions followed Langmuir isotherm. The adsorption kinetics was best described by pseudo-second order model. The potential for using a blend of coal and agricultural byproduct (I. gabonensis seed shell was found a viable alternative for removal of toxic heavy metals from aqueous solutions.

  15. Report of activities of the advanced coal extraction systems definition project, 1979 - 1980

    Science.gov (United States)

    Lavin, M. L.; Isenberg, L.

    1981-01-01

    During this period effort was devoted to: formulation of system performance goals in the areas of production cost, miner safety, miner health, environmental impact, and coal conservation, survey and in depth assessment of promising technology, and characterization of potential resource targets. Primary system performance goals are to achieve a return on incremental investment of 150% of the value required for a low risk capital improvement project and to reduce deaths and disability injuries per million man-hour by 50%. Although these performance goals were developed to be immediately applicable to the Central Appalachian coal resources, they were also designed to be readily adaptable to other coals by appending a geological description of the new resource. The work done on technology assessment was concerned with the performance of the slurry haulage system.

  16. Environmental considerations of coal gasification technology and the Wabash River Repowering Project

    International Nuclear Information System (INIS)

    Lessig, W.S.; Frederick, J.D.

    1993-01-01

    The Clean Air Act Amendments of 1990 have mandated a significant reduction in sulfur dioxide emissions. Coal gasification can assist coal burning utilities in meeting this challenge. The use of combustion turbines in the cycle is an important factor in terms of efficiency and pollution control technologies. The gasification process can be utilized in several applications including 'repowering' existing coal-fired facilities as well as new 'greenfield' projects. This paper addresses the environmental benefits of the repowering application at PSI Energy's Wabash River Station. The environmental impacts of air, water, solid waste, trace hazardous air pollutants, and fuel sources are addressed. Specifically, sulfur removal is discussed on both a technical and an economic level

  17. Coal/Biomass-to-Liquids Demonstration Testing for DLA Energy: Report on Project Tests, Evaluations, and Recommendations

    Science.gov (United States)

    2015-08-20

    Report January 2010-August 2015 Coal/ Biomass -to-Liquids Demonstration Testing for DLA Energy Report on Project Tests, Evaluations, and...produced commercially from coal and biomass mixtures while meeting the requirements of Section 526, which requires that GHG emissions from...gasification equipment, coals, and biomass used, and reports and analyzes the test results. Additionally, the team worked with DOE NETL to conduct

  18. FY 1981 Report on the results of Sunshine Project. Coal energy; 1981 nendo sunshine keikaku seika hokokusho. Sekitan energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    This report presents the results of (researches on solvolysis liquefaction mechanisms and reaction promotion with oil- and coal-based solvents), conducted as part of the research and development project for coal liquefaction techniques. The FY 1981 program includes researches on (1) the effects of liquefaction reaction conditions on liquefaction yield and production of light products for coal species of low degree of carbonization, including brown coal, (2) the effects of pretreatment of coal on its liquefaction reactivity, and (3) up-grading of the solvolysis coal liquid (SCL). For the item (1), HA240 (hydrogenated Ashland's A240) is used to investigate its liquefaction capacity for various coal species of low degree of carbonization, including brown coal. For the item (2), the effects of pretreatment in a hot water bath with reflux was investigated for sub-bituminous coal in the FY 1980. In the FY 1981, various pretreatment methods are attempted for enhancing liquefaction reactivity of brown coal. As a result, it is found that ash content of brown coal is decreased to one-third of the initial level, when it is treated in a diluted hydrochloric acid bath with reflux. For the item (3), SCL hydrogenated by Birch reduction (B-SCL, 1) is compared with H-SCL with respect to properties, structures and thermal crackability, to discuss the items required for the catalyst to be used in the second stage by clarifying effectiveness of the catalyst. (NEDO)

  19. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  20. Enginnering development of coal-fired high performance power systems phase II and III

    International Nuclear Information System (INIS)

    1998-01-01

    This report presents work carried out under contract DE-AC22-95PC95144 ''Engineering Development of Coal-Fired High Performance Systems Phase II and III.'' The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) that is capable of: thermal efficiency (HHV) >47%; NOx, SOx, and particulates 65% of heat input; all solid wastes benign; cost of electricity <90% of present plants. Phase I, which began in 1992, focused on the analysis of various configurations of indirectly fired cycles and on technical assessments of alternative plant subsystems and components, including performance requirements, developmental status, design options, complexity and reliability, and capital and operating costs. Phase I also included preliminary R ampersand D and the preparation of designs for HIPPS commercial plants approximately 300 MWe in size. This phase, Phase II, involves the development and testing of plant subsystems, refinement and updating of the HIPPS commercial plant design, and the site selection and engineering design of a HIPPS prototype plant. Work reported herein is from: Task 2.2 HITAF Air Heaters; Task 6 HIPPS Commercial Plant Design Update

  1. FEBEX II Project THG Laboratory Experiments

    International Nuclear Information System (INIS)

    Missana, T.

    2004-01-01

    The main roles of the bentonite in a radioactive waste repository is to act as a geochemical barrier against the radionuclides migration. The effectiveness of this geochemical barrier depends on the surface properties of the solid phases and on the physico-chemical environment generated by the interaction of the solid phases with the groundwater. Within the FEBEX (Full-scale Engineered Barriers Experiment) project, a program of laboratory tests was designed to study and to understand the processes taking place in the clay barrier. Since the first stages of the project, these laboratory tests enabled to isolate different processes, making easier their interpretation, and provided fundamental parameters to be used in the Thermo Hydro Mechanical (THM) and Thermo Hydro Geochemical (THG) models. Additionally, experimental data enabled to check the predictive capability of these models. In the second phase of the project, laboratory tests focused on all those relevant aspects not sufficiently covered during FEBEX I. Particularly, the following main objectives were proposed for the THG investigations during FEBEX II : Attainment of a reliable description of the pore water chemistry at different geochemical conditions. Identification of the different types of water present in the bentonite and to determine the amount of available water for the solute transport.Evaluation of the potential effects of the extraction pressure in the chemical composition of the water obtained by squeezing methods.Study of the effects of the exchange complex in the rheological properties of the clay.Identification and modelling of the surface processes occurring in smectite, determination of the solubility constants of smectite and the formation constants of the surface complexes.Understanding of the mechanisms involved in the sorption of different radionuclides in the bentonite. Investigation of the diffusion mechanisms of conservative neutral and anionic species to have a deeper insight on the

  2. FEBEX II Project THG Laboratory Experiments

    Energy Technology Data Exchange (ETDEWEB)

    Missana, T.

    2004-07-01

    The main roles of the bentonite in a radioactive waste repository is to act as a geochemical barrier against the radionuclides migration. The effectiveness of this geochemical barrier depends on the surface properties of the solid phases and on the physico-chemical environment generated by the interaction of the solid phases with the groundwater. Within the FEBEX (Full-scale Engineered Barriers Experiment) project, a program of laboratory tests was designed to study and to understand the processes taking place in the clay barrier. Since the first stages of the project, these laboratory tests enabled to isolate different processes, making easier their interpretation, and provided fundamental parameters to be used in the Thermo Hydro Mechanical (THM) and Thermo Hydro Geochemical (THG) models. Additionally, experimental data enabled to check the predictive capability of these models. In the second phase of the project, laboratory tests focused on all those relevant aspects not sufficiently covered during FEBEX I. Particularly, the following main objectives were proposed for the THG investigations during FEBEX II : Attainment of a reliable description of the pore water chemistry at different geochemical conditions. Identification of the different types of water present in the bentonite and to determine the amount of available water for the solute transport.Evaluation of the potential effects of the extraction pressure in the chemical composition of the water obtained by squeezing methods.Study of the effects of the exchange complex in the rheological properties of the clay.Identification and modelling of the surface processes occurring in smectite, determination of the solubility constants of smectite and the formation constants of the surface complexes.Understanding of the mechanisms involved in the sorption of different radionuclides in the bentonite. Investigation of the diffusion mechanisms of conservative neutral and anionic species to have a deeper insight on the

  3. Comprehensive report to Congress Clean Coal Technology Program. Four Rivers Energy Modernization Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    One of the five projects selected for funding within the Clean Coal Technology Program is a project proposed by Air Products and Chemicals, Inc. (APCI) of Allentown, Pennsylvania. APCI requested financial assistance from DOE for the design, construction, and operation of a 95 megawatt-electric (MWe) gross equivalent, second generation, pressurized, circulating fluidized bed (PCFB) combustor cogeneration facility. The project, named the Four Rivers Energy Modernization Project, is co be located adjacent to an existing APCI chemicals manufacturing facility in Calvert City, Kentucky. Four Rivers Energy Partners, L.P. (FREP), will execute the project. The demonstration plant will produce approximately 70 MWe for the utility grid and an average of 310,000 pounds per hour of process steam for the chemicals manufacturing facility. The project, including the demonstration phase, will last 80 months at a total cost of $360,707,500. DOE`s share of the project cost will be 39.5 percent, or $142,460,000. The objective of the proposed project is to demonstrate a second generation PCFB system based on technology being supplied by Foster Wheeler Energy Corporation (FWEC), Westinghouse Electric Corporation (Westinghouse), and LLB Lurgi Lentjes Babcock Energietechnik GmbH (LLB). The integrated performance to be demonstrated will involve all of the process systems, including coal preparation and feed, sorbent feed, carbonizer, char transfer, PCFB combustor, carbonizer and combustor hot-gas filtration, carbonizer and combustor alkali removal, topping combustor, gas turbine-generator, heat recovery steam generator (HRSG), steam turbine-generator, and balance-of-plant systems. The project will utilize Western Kentucky and Southern Illinois bituminous coal.

  4. Report on the achievements in the Sunshine Project in investigations and studies on treatment technologies for coals used in coal gasification. A report on coal type investigation; Sekitan gas ka yotan no shori gijutsu ni kansuru chosa kenkyu. Tanshu chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    This paper reports the investigation on coal types for coal gasification in the Sunshine Project. With regard to the status of existence, production and dressing of coals as the material for coal gasification and liquefaction, summarized site investigations and sampling were performed on underground mining coal mines being operated in Japan. Test sample coals are put into a data file as the important fundamental data for gasification and liquefaction characteristics tests at the Japan Coal Energy Center. The sampling investigation is planned to start in fiscal 1988. The coal mines having been investigated to date include: Taiheiyo Coal Mine (Kushiro), Mitsui Coal Mining Industry (Miike), Matsushima Coal Mine (Ikejima), Mitsubishi Coal Mining Industry (Minami O-Yubari), Sumitomo Coal Akabira Coal Mine (Akabira), Mitsui Coal Mining Industry (Ashibetsu), and Sorachi Coal Mine (Sorachi). Coal beds subjected to the sampling were selected upon carefully discussing with the site engineers on the current status of the coal mine, and the coal beds that could be operated in the future. The sampling method was such that the whole coal bed from the upper bed to the lower bed at the facing was sampled and put into vinyl sampling bags each at about 2 kg as the target. (NEDO)

  5. Alaska Regional Energy Resources Planning Project. Phase 2: coal, hydroelectric and energy alternatives. Volume I. Beluga Coal District Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Rutledge, G.; Lane, D.; Edblom, G.

    1980-01-01

    This volume deals with the problems and procedures inherent in the development of the Beluga Coal District. Socio-economic implications of the development and management alternatives are discussed. A review of permits and approvals necessary for the initial development of Beluga Coal Field is presented. Major land tenure issues in the Beluga Coal District as well as existing transportation routes and proposed routes and sites are discussed. The various coal technologies which might be employed at Beluga are described. Transportation options and associated costs of transporting coal from the mine site area to a connecting point with a major, longer distance transportation made and of transporting coal both within and outside (exportation) the state are discussed. Some environmental issues involved in the development of the Beluga Coal Field are presented. (DMC)

  6. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  7. Clean Coal Technology Demonstration Program: Project fact sheets 2000, status as of June 30, 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The Clean Coal Technology Demonstration Program (CCT Program), a model of government and industry cooperation, responds to the Department of Energy's (DOE) mission to foster a secure and reliable energy system that is environmentally and economically sustainable. The CCT Program represents an investment of over $5.2 billion in advanced coal-based technology, with industry and state governments providing an unprecedented 66 percent of the funding. With 26 of the 38 active projects having completed operations, the CCT Program has yielded clean coal technologies (CCTs) that are capable of meeting existing and emerging environmental regulations and competing in a deregulated electric power marketplace. The CCT Program is providing a portfolio of technologies that will assure that U.S. recoverable coal reserves of 274 billion tons can continue to supply the nation's energy needs economically and in an environmentally sound manner. As the nation embarks on a new millennium, many of the clean coal technologies have realized commercial application. Industry stands ready to respond to the energy and environmental demands of the 21st century, both domestically and internationally, For existing power plants, there are cost-effective environmental control devices to control sulfur dioxide (S02), nitrogen oxides (NO,), and particulate matter (PM). Also ready is a new generation of technologies that can produce electricity and other commodities, such as steam and synthetic gas, and provide efficiencies and environmental performance responsive to global climate change concerns. The CCT Program took a pollution prevention approach as well, demonstrating technologies that remove pollutants or their precursors from coal-based fuels before combustion. Finally, new technologies were introduced into the major coal-based industries, such as steel production, to enhance environmental performance. Thanks in part to the CCT Program, coal--abundant, secure, and economical

  8. Impact of National Fadama Development Project II on Rice farmers ...

    African Journals Online (AJOL)

    ... examined the impact of National Fadama Development Project II on the profitability of rice farmers and assessed the extent to which the various innovations disseminated by the project were adopted by the rice farmer beneficiaries. The project which had all operating expenses cofinanced by the various key stakeholders ...

  9. FY 2000 Feasibility study on the environmentally-friendly coal utilization systems as part of the international project for coal utilization measures. Feasibility study on supporting introduction of the environmentally-friendly coal utilization systems in Vietnam (Model project for introduction of advanced coal preparation systems); 2000 nendo kokusai sekitan riyo taisaku jigyo chosa hokokusho. Kankyo chowagata sekitan riyo system kanosei chosa jigyo Vietnam ni okeru kankyo chowagata sekitan riyo system donyu shien jigyo (kodo sentan system donyu model jigyo kanosei chosa jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    The feasibility study was conducted on a model project in Vietnam, aimed at solving the environmental pollution problems resulting from use of coal by demonstrating and disseminating the Japan's environmental technologies in the Southeast Asian countries. The feasibility study was conducted for the Cua Ong Coal Preparation Enterprise, which has the largest coal preparation capacity in Vietnam and port facilities. It is treating raw coal from 10 coal mines for classification and preparation, and shipping coal of various types that meet the standards for domestic use and export. The survey results point out that unrecovered coal remains in waste water discharged from the coal preparation plants to pollute the sea area, and that quantity of the refuse increases because of the unrecovered coal it contains. The environmental technologies needed to introduce include modification to variable wave pattern type jigging separator, refuse height measuring instrument and automatic controller, circulating heavy medium gravimeter, highly functional settling pond, and flocculent facilities. (NEDO)

  10. Coal liquefaction: A research and development needs assessment: Final report, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Schindler, H.D.; Burke, F.P.; Chao, K.C.; Davis, B.H.; Gorbaty, M.L.; Klier, K.; Kruse, C.W.; Larsen, J.W.; Lumpkin, R.E.; McIlwain, M.E.; Wender, I.; Stewart, N.

    1989-03-01

    Volume II of this report on an assessment of research needs for coal liquefaction contains reviews of the five liquefaction technologies---direct, indirect, pyrolysis, coprocessing, and bioconversion. These reviews are not meant to be encyclopedic; several outstanding reviews of liquefaction have appeared in recent years and the reader is referred to these whenever applicable. Instead, these chapters contain reviews of selected topics that serve to support the panel's recommendations or to illustrate recent accomplishments, work in progress, or areas of major research interest. At the beginning of each of these chapters is a brief introduction and a summary of the most important research recommendations brought out during the panel discussions and supported by the material presented in the review. A review of liquefaction developments outside the US is included. 594 refs., 100 figs., 60 tabs.

  11. Removal of Mn(II) from the acid mine wastewaters using coal fired bottom ash

    Science.gov (United States)

    Mahidin, M.; Sulaiman, T. N.; Muslim, A.; Gani, A.

    2017-06-01

    Acid mine wastewater (AMW), the wastewater from mining activities which has low pH about 3-5 and contains hazardous heavy metals such as Cu, Fe, Mn, Zn, Pb, etc. Those heavy metals pollution is of prime concern from the environmental view point. Among the heavy metals, Mn occupies the third position in the AMW from one the iron ore mining company in Aceh, Indonesia. In this study, the possibility use of bottom ash from coal fired boiler of steam power plants for the removal of Mn(II) in AMW has been investigated. Experimental has been conducted as follows. Activation of bottom ash was done both by physical and chemical treatments through heating at 270 °C and washing with NaOH activator 0.5 and 1 M. Adsorption test contains two parts observation; preliminary and primary experiments. Preliminary study is addressed to select the best condition of three independent variables i.e.: pH of AMW (3 & 7), bottom ash particle size (40, 60 & 100 mesh) and initial Mn(II) concentrations (100 & 600 mg/l). AMW used was synthetics wastewater. It was found that the best value for NaOH is 1 M, pH is 7, particle size is 100 meshes and initial Mn(II) concentration is 600 mg/l from the adsorption efficiency point of view. The maximum adsorption capacity (q e) is 63.7 mg/g with the efficiency of 85%.

  12. Lifts of projective congruence groups, II

    DEFF Research Database (Denmark)

    Kiming, Ian

    2014-01-01

    We continue and complete our previous paper ``Lifts of projective congruence groups'' concerning the question of whether there exist noncongruence subgroups of  that are projectively equivalent to one of the groups  or . A complete answer to this question is obtained: In case of  such noncongruence...

  13. Sears Point Tidal Marsh Restoration Project: Phase II

    Science.gov (United States)

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase II, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  14. Action of coal gas on plants. II. Action on green plants

    Energy Technology Data Exchange (ETDEWEB)

    Wehmer, C

    1917-01-01

    Experiments were performed to determine the effects of coal gas on cress. Although the seeds are not killed by coal gas, they are prevented from germinating. Cress will grow in as much as 30% coal gas, but it will not survive higher concentrations. Coal gas contains both toxic and non-toxic constituents. CO, C/sub 2/H/sub 4/, C/sub 2/H/sub 2/, CS/sub 2/, H/sub 2/S are not toxic at concentrations found in coal gas. The toxic effects of coal gas are not caused by the lack of O/sub 2/, but by minor impurities in the gas.

  15. LHC related projects and studies - Part (II)

    International Nuclear Information System (INIS)

    Rossi, L.; De Maria, R.

    2012-01-01

    The session was devoted to address some aspects of the HL-LHC (High Luminosity LHC) project and explore ideas on new machines for the long term future. The session had two parts. The former focused on some of the key issues of the HL-LHC projects: beam current limits, evolution of the collimation system, research plans for the interaction region magnets and crab cavities. The latter explored the ideas for the long term future projects (LHeC and HE-LHC) and how the current research-development program for magnets and RF structures could fit in the envisaged scenarios

  16. Joint verification project on environmentally friendly coal utilization systems. Joint verification project on the water-saving coal preparation system; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In this verification project, clean technology which should be spread in China was verified and the base structure for its spread was prepared for the purpose of controlling emissions of environmental pollutants associated with the coal utilization in China and of contributing to secure energy acquisition of Japan. As joint verification projects, a general rehabilitation type coal preparation system was installed in the Wangfenggang coal preparation plant, and a central control coal preparation system was installed in the Qingtan coal preparation plant. In the former, a system is verified in which optimum operation, water-saving, high quality, and heightening of efficiency can be obtained by introducing two computing systems for operation control and quality control, various measuring instruments, and analyzers to coal preparation plants where analog operation is conducted helped by Russia and Porland and have problems about quality control. In the latter, a central control system achieving water saving is verified by introducing rapid ash meters, scales, desitometers and computers to coal preparation plants having zigzag or heavy-fluid cyclon and connecting various kinds of information through network. For fiscal 1994, investigation and study were conducted. 51 figs., 9 tabs.

  17. The Tactics of Persuasion: Environmental negotiations over a corporate coal project in coastal India

    International Nuclear Information System (INIS)

    Kohli, Kanchi; Menon, Manju

    2016-01-01

    Following the earthquake of 2001 in the Kutch district of Gujarat (India), the state government and corporate investors have focussed on the coastal areas of Kutch, India's largest district, for economic and infrastructure development. Within a decade of industrialisation of this landscape, these projects have had profound impacts on the environment, livelihoods and futures of its Kutchi inhabitants. Today, the coastline between the old Kandla and Mundra ports is drawn into a three-way battle between International Financial Institutions (IFIs) investing in coal projects, technical experts of sustainable development and international anti-coal campaigners. These three groups have selectively engaged the project affected Kutchis on the importance of economic development, environmental management and climate change. But the affected local people comprising artisanal fisherfolk who belong to a minority community, economically powerful salt and agricultural farmers and a traditional pastoral community of camel herders, frame, debate and act upon the impacts of the project in pragmatic ways. The range of remedies sought by them can be located between the practical expediency of everyday life and ethical questions about correct action. These remedies offer a glimpse of what regulatory bodies should be paying attention to rather than abstract or procedural justice. - Highlights: • The Bhuj earthquake of 2001 lead to the economic reshaping of Kutch. • Coal based imports, transportation and power generation has undermined local livelihood and ecology. • Without remedies, affected people are drawn into corporate patronage relations. • Impacts need to be addressed soon, close to the site, and with local involvement. • If embedded in the locality, energy regulation can become mutually beneficial.

  18. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  19. EBR-II and TREAT Digitization Project

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, George W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rabiti, Cristian [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Digitizing the technical drawings for EBR-II and TREAT provides multiple benefits. Moving the scanned or hard copy drawings to modern 3-D CAD (Computer Aided Drawing) format saves data that could be lost over time. The 3-D drawings produce models that can interface with other drawings to make complex assemblies. The 3-D CAD format can also include detailed material properties and parametric coding that can tie critical dimensions together allowing easier modification. Creating the new files from the old drawings has found multiple inconsistencies that are being flagged or corrected improving understanding of the reactor(s).

  20. EBR-II and TREAT Digitization Project

    International Nuclear Information System (INIS)

    Griffith, George W.; Rabiti, Cristian

    2015-01-01

    Digitizing the technical drawings for EBR-II and TREAT provides multiple benefits. Moving the scanned or hard copy drawings to modern 3-D CAD (Computer Aided Drawing) format saves data that could be lost over time. The 3-D drawings produce models that can interface with other drawings to make complex assemblies. The 3-D CAD format can also include detailed material properties and parametric coding that can tie critical dimensions together allowing easier modification. Creating the new files from the old drawings has found multiple inconsistencies that are being flagged or corrected improving understanding of the reactor(s).

  1. Status of the DESY II project

    International Nuclear Information System (INIS)

    Hemmie, G.

    1987-01-01

    DESY II has been extensively tested at low magnet current excitations corresponding to 1 GeV maximum energy. After the old DESY I synchrotron was turned off in Nov. 86 the provisional power supplies were replaced by magnet- and rf-power supplies of full 8 GeV rating. All external beam lines have now been connected to the new machine. Some modifications on components are described. A report on the results from the initial tests of the machine under full power conditions is given

  2. Preliminary project definition for long duration. Tests of coal fired MHD generators

    International Nuclear Information System (INIS)

    Van der Laken, R.A.

    1992-01-01

    In its final report the Faraday Working Group recommended the CEC amongst others to explore the possibility of a long duration test of a 'state-of-the-art', MHD-generator in order to remove uncertainties concerning the lifetime and availability of such a generator design. The duration of the test should be several thousands of hours, considerably more than the duration tests carried out until now. The scope of the present study is to prepare a project definition document for a long duration test of a coal fired, state-of-the-art MHD-generator

  3. Report on the achievements in the Sunshine Project in fiscal 1993 on development of a jet flow bed gasification electric power plant. Investigative research on a technology to treat coals used for coal gasification (investigation for coal type selection); 1993 nendo funryusho gas ka hatsuden plant kaihatsu seika hokokusho. Sekitan gas kayotan no shori gijutsu ni kansuru chosa kenkyu (tanshu sentei chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1984-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1993 in the investigation for coal type selection. The investigation is purposed to elucidate the status of existence and resources of coals as the raw material for coal gasification and liquefaction, the coal quality features, and the gasification and liquefaction characteristics. The results will be used as the fundamental materials for technological development. Discussions will also be given on the coal applicability to the composite gasification power generation system in which liquefied residue generated in the process are mixed with the supplied coal. Coal quality analysis and a liquefaction test under the standard condition were completed on 389 test samples composed of 136 kinds of coals produced in Canada, Australia, the U.S.A., China and Indonesia. Coal types were enumerated according to the oil yield. A gasification test was performed on the specific gravity separated coals of Chinese coals to discuss the effect of change in the ash amount on the gasification characteristics. A partial coal combustion test revealed that fuel ratio, oxygen partial pressure, and oxygen molar fraction parameters affect the combustion characteristics. The micro-gravity field is effective in discussing the combustion characteristics of particulate groups of dust coal. A coal oxidizing test was performed, wherein oxidizing characteristics and spontaneous ignition performance were estimated successfully from temperature rise of heat stored in coal. The coal type matrix data were prepared. (NEDO)

  4. Strengthening national coal transitions to raise climate ambition. Issue Brief. Part of the 'Coal Transitions: Research and Dialogue on the Future of Coal' Project

    International Nuclear Information System (INIS)

    Sartor, Oliver

    2017-11-01

    The issue of coal transitions is coming into focus in both national and international climate policy discussions. There are several drivers of this. At one level, the Paris Agreement marked a significant shift in the pace, scope and ambition of global climate change mitigation action. Consequently, it is now clear that coal will need to play a more and more diminished role in the global energy mix in the coming decades, despite carbon capture and storage (CCS) technologies. It is also increasingly clear that non-climate policy-related factors, such as rapid declines in the cost of renewable energy and battery storage, will continue to challenge the previously strong role of steam coal in the global energy mix (Randall, 2015). The business-as-usual scenario is therefore evolving quickly and the downside risks to coal demand appear to be increasing. The accumulation of these factors has in turn led to a call for an assurance of 'just transition', especially from stakeholders-notably coal sector workers and their communities-whose economic livelihoods depend on the future of an industry that will be in decline. In this context, parties to the UNFCCC will be called upon via the Facilitative Dialogue of 2018 to re-evaluate the adequacy progress and subsequently to revise their levels of ambition in their nationally determined contributions (NDCs). This moment presents an important opportunity for governments to raise the overall ambition of their policies on coal transition. But how should they do this? (author)

  5. Fiscal 1998 engineer interchange project on the engineer interchange project (coal mine technology field), international interchange project. Preliminary study in Russia; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Russia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    For the engineer interchange project (coal mine technology field), field survey for collecting information was made on the level and trend of production technology through visits to some coal industry organizations by specialists in Russia which is one candidate for the engineer training project by sending and receiving. Although coal is positioned as an important energy resource in Russia, poor business performance and a decrease in production are reported because of privatization and cur off of subsidies during a transfer period to a market economy. In addition, severe environment surrounding the Russian coal industry such as a delay of facility renewal due to poor funds, overage facilities, and moral reduction of workers due to a rationing delay has a potential for further reduction of production. The research group thus surveyed the current state of the Russian coal industry such as actual production structures, actual coal mines, technical levels, and various problem points in Moscow and Baykal districts. (NEDO)

  6. Research on mechanism of and catalysts for extraction liquefaction of coal using coal-based solvents; Sekitankei yozai ni yoru sekitan no chushutsu ekika kiko to shokubai no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    Papers of Professor Yoshio Kamiya of Tokyo University are compiled into this report. The list of the papers includes (1) Synthesis of heavy fuel oils from coal; (2) Research and development of coal liquefaction; (3) Dissolution reaction of coal by hydrogen-donating aromatic solvents (I); (4) Effect of hydrogen-donor solvent on the liquefaction of coal; (5) Recent studies on the chemical structure of solvent refined coal; (6) Dissolution reaction of coal by hydrogen-donating aromatic solvents (II); (7) Future of coal as energy material; (8), (9), (10) same as (6) in the subject discussed; (11) Recent studies on coal liquefaction catalysts; (12) Environmental problems and drain treatment to accompany processes of converting fossil resources into fuels; (13) Chemistry of coal oxidation; (14) Fractionation and analysis of solvent refined coal by gel permeation chromatography; (15) Current state of research and development of coal liquefaction; (16) Properties and components of coal oils from coal liquefaction processes under development; (17) Solvent effect of coal derived aromatic compounds on the liquefaction of Akabira coal; (18) Chemistry of coal liquefaction; (19) Research and development of coal liquefaction in the U.S.; (20) Thermal treatment of coal-related aromatic ethers in tetralin solution; (21) Recent technology of utilizing heavy carbon resources; (22) Chemical properties and reactivity of coal; (23) Current state and future of development of coal liquefaction processes; and (24) Development of overseas coal liquefaction projects. (NEDO)

  7. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Giordano, Anthony P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-25

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  8. Project management at Heysham II and Torness

    International Nuclear Information System (INIS)

    Taylor, D.

    1987-01-01

    The National Nuclear Corporation (NNC) have contracts from the Central Electricity Generating Board (CEGB) and the South of Scotland Electricity Board (SSEB) for the design and construction of the AGR Nuclear Power Stations at Heysham II and Torness. Within these contracts, procurement and construction of the various components making up the Nuclear Island are managed by NNC as agents of the two generating boards. Other responsibilities are for the design of the whole station, preparation of the safety case and on-site management of the Nuclear Island at both stations. Additional responsibilities are included in the Torness contract such that NNC manage almost the whole of the site works. Construction of both stations started in August 1980 and power raising is expected to commence on time at the end of this year. Both stations are close to the original budget. This paper examines factors which have contributed to this success including the relationship between NNC, the contractors, clients and the safety authority. (author)

  9. Refining and end use study of coal liquids II - linear programming analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lowe, C.; Tam, S.

    1995-12-31

    A DOE-funded study is underway to determine the optimum refinery processing schemes for producing transportation fuels that will meet CAAA regulations from direct and indirect coal liquids. The study consists of three major parts: pilot plant testing of critical upgrading processes, linear programming analysis of different processing schemes, and engine emission testing of final products. Currently, fractions of a direct coal liquid produced form bituminous coal are being tested in sequence of pilot plant upgrading processes. This work is discussed in a separate paper. The linear programming model, which is the subject of this paper, has been completed for the petroleum refinery and is being modified to handle coal liquids based on the pilot plant test results. Preliminary coal liquid evaluation studies indicate that, if a refinery expansion scenario is adopted, then the marginal value of the coal liquid (over the base petroleum crude) is $3-4/bbl.

  10. Venezuelan coal

    International Nuclear Information System (INIS)

    Vazquez, L.U.

    1991-01-01

    The existence of coal deposits in Venezuela has been known since the early nineteenth century, when the Naricual Mines were discovered in the State of Anzoategui Eastern Venezuela. Through the years the Venezuelan coal business had its ups and downs, but it was not until 1988 that we could properly say that our coal began to play a role in the international market. This paper reports that it is only now, in the nineties, that Venezuelan coal projects have come under a planning, promotional and developmental policy preparing the ground for the great projects Venezuela will have in the not-too-distant future

  11. Engineering development of advanced coal-fired low-emissions boiler system. Phase II subsystem test design and plan - an addendum to the Phase II RD & T Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    Shortly after the year 2000 it is expected that new generating plants will be needed to meet the growing demand for electricity and to replace the aging plants that are nearing the end of their useful service life. The plants of the future will need to be extremely clean, highly efficient and economical. Continuing concerns over acid rain, air toxics, global climate changes, ozone depletion and solid waste disposal are expected to further then regulations. In the late 1980`s it was commonly believed that coal-fired power plants of the future would incorporate either some form of Integrated Gasification Combined Cycle (IGCC) or first generation Pressurized Fluidized Bed Combustion (PFBS) technologies. However, recent advances In emission control techniques at reduced costs and auxiliary power requirements coupled with significant improvements In steam turbine and cycle design have clearly indicated that pulverized coal technology can continue to be competitive In both cost and performance. In recognition of the competitive potential for advanced pulverized coal-fired systems with other emerging advanced coal-fired technologies, DOE`s Pittsburgh Energy Technology Center (PETC) began a research and development initiative In late 1990 named, Combustion 2000, with the intention of preserving and expanding coal as a principal fuel In the Generation of electrical power. The project was designed for two stages of commercialization, the nearer-term Low Emission Boiler System (LEBS) program, and for the future, the High Performance Power System (HIPPS) program. B&W is participating In the LEBS program.

  12. Brazilian Decimetric Array (BDA) project - Phase II

    Science.gov (United States)

    Faria, C.; Stephany, S.; Sawant, H. S.; Cecatto, J. R.; Fernandes, F. C. R.

    2010-02-01

    The configuration of the second phase of the Brazilian Decimetric Array (BDA), installed at Cachoeira Paulista, Brazil (Longitude 45° 0‧ 20″ W and Latitude 22° 41‧ 19″ S), is a T-shaped array where 21 antennas are being added to existing 5 antennas of the first phase. In the third phase, in each arm of the T array, four more antennas will be added and baselines will be increased to 2.5 × 1.25 km in east-west and south directions, respectively. The antennas will be equally spaced at the distances of 250 meters from the central antenna of the T-array. Also, the frequency range will be increased to 1.2-1.7, 2.8 and 5.6 GHz. The Second phase of the BDA should be operational by the middle of 2010 and will operate in the frequency range of (1.2-1.7) GHz for solar and non solar observations. Here, we present the characteristics of the second phase of the BDA project, details of the array configuration, the u-v coverage, the synthesized beam obtained for the proposed configuration.

  13. A status report on the PBFA II construction project

    International Nuclear Information System (INIS)

    Barr, G.W.; Furaus, J.P.; Cook, D.L.; Shirley, C.G.

    1985-01-01

    The Particle Beam Fusion Accelerator II (PBFA II) is under construction at Sandia National Laboratories (SNL). PBFA II contains 36 individual power modules configured in a stacked radial geometry and synchronized to provide greater than 3.5 MJ of energy into the vacuum section in a single 55-ns-wide 90-TW peak power pulse. This R and D construction project is being implemented in a fast track schedule mode in which final design of the accelerator components occurs in parallel with the construction of the laboratory building and the accelerator tank. PBFA II is scheduled to become operational in January 1986 with its first multi-module shot into an applied-B ion diode that will generate and transport a beam of lithium ions. Plans are now being made for experimental work on PBFA II beyond the construction phase

  14. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  15. Joint European project on underground coal gasification in Spain; Proyecto europeo conjunto de gasificacion subterranea de carbon en Espana

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, J.M.; Obis, A.; Menendez, E.; Albeniz, M.A.; Chandelle, V.; Mostade, M.; Bailey, A.C. [ITGE, Madrid (Spain)

    1992-09-01

    Organizations from Spain, Belgium and the United Kingdom are collaborating in a field test of underground coal gasification which is being implemented in the north of Teruel Province (Spain). The test is first phase of a European development programme on in-situ coal gasification, being carried out with financial help from the Commission of the European Communities. This paper covers a forecast of the future energy demand for Europe, the potential of in-situ coal gasification, and a summary of the recent development of in-situ coal gasification. The circumstances which led to the formation of a European organisation (UEE) which will implement the project are described, and its objectives are presented. The geological characteristics of the proposed region are detailed, together with the test programme, and its successive phases in realising the principle parameters of the operations.

  16. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  17. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Overseas workshop; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The international exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998, the 'Overseas workshop' has performed exchange in technologies with Australian coal mine engineers. The project refers to the Australian technological levels and needs in coal production, safety control and environment, as well as transfer of the Japanese coal mine technologies. This report summarizes the result of a survey on the engineer exchange project in the coal mine technology area and the possibility of joint researches. The 'overseas workshop' was held in November 1998 for two days in Brisbane City in QLD Province as the 'Japan-Australia coal technology workshop'. The 'Japan-Australia coal technology workshop' gave lectures in five sessions (the basic lecture, Japan-Australia high-speed excavation project, coal mine gas control project, exploration and resources, and development and experience of Japan). It also discussed two themes (mine safety management and rules, and greenhouse effect gases and coal mining). Two coal mines were visited thereafter to deepen the exchange with the Australian coal mine engineers. (NEDO)

  18. Japan's New Sunshine Project. 1994 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This paper summarizes the report for fiscal 1994 on research and development related to coal liquefaction and gasification. In the research and development of coal liquefaction technologies, reports were given on research of liquefaction characteristics of different coals and liquefaction process thereof, and on research of catalysts for the coal liquefaction. In the research and development of coal gasification technologies, reports were given on fundamental studies on gasification characteristics of different coals. In the research and development of liquefaction technologies for bituminous coal, reports were given on design, construction and operation of a bituminous coal liquefaction pilot plant with a capacity of 150 t/d, and the operation supporting studies on the pilot plant. In the fundamental research on the coal liquefaction process, reports were given on refining technologies and utilization of the refined materials, and studies on environment preservation in applying the coal liquefaction technologies. In the research on hydrogen manufacturing technologies by using the fundamental coal technology, reports were given on design, construction and operational studies of a pilot plant. In the research and development of the coal gasification technologies, reports were given on development of a jet-flow gasified coal electric power plant, selection of coals, and development of a data processing system. (NEDO)

  19. Japan's New Sunshine Project. 1994 annual summary of coal liquefaction and gasification

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This paper summarizes the report for fiscal 1994 on research and development related to coal liquefaction and gasification. In the research and development of coal liquefaction technologies, reports were given on research of liquefaction characteristics of different coals and liquefaction process thereof, and on research of catalysts for the coal liquefaction. In the research and development of coal gasification technologies, reports were given on fundamental studies on gasification characteristics of different coals. In the research and development of liquefaction technologies for bituminous coal, reports were given on design, construction and operation of a bituminous coal liquefaction pilot plant with a capacity of 150 t/d, and the operation supporting studies on the pilot plant. In the fundamental research on the coal liquefaction process, reports were given on refining technologies and utilization of the refined materials, and studies on environment preservation in applying the coal liquefaction technologies. In the research on hydrogen manufacturing technologies by using the fundamental coal technology, reports were given on design, construction and operational studies of a pilot plant. In the research and development of the coal gasification technologies, reports were given on development of a jet-flow gasified coal electric power plant, selection of coals, and development of a data processing system. (NEDO)

  20. FY 1980 Report on results of Sunshine Project by Coal Group. Basic researches on coal liquefaction techniques by solvolysis; 1980 nendo sunshine keikaku sekitanhan hokokusho. Sekitan no solvolysis ekika gijutsu no kiso kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    The basic experimental researches were carried out for coal liquefaction by solvolysis. The studied items include hydrogenation conditions for treating the primary liquefied products, asphalt, pitch and model solvents (e.g., anthracene oil) in the presence of a commercial catalyst, solvolysis conditions for finely divided, molten coal using a hydrogenation recycled solvent, hydrotreating solvents, analysis of solvolysis-liquefied products, and liquefaction capacity of fractionated solvents for finely divided, molten coal. The studied items for separation of minerals include settlement at high temperature of the solid residue from the first liquefaction stage, and changed coal particle size distribution as a result of the first-stage liquefaction reactions in the presence of a hydrogenation solvent. The experimental study results indicate that conversion of finely divided molten coal into asphaltenes and preasphaltenes is notably accelerated in the phase-II coal liquefaction process by solvolysis, when a hydrotreating solvent is used for the first stage solvolysis process. (NEDO)

  1. A collaborative project on the effects of coal quality on NO{sub x} emissions and carbon burnout in pulverised coal-fired utility boilers

    Energy Technology Data Exchange (ETDEWEB)

    Tilley, H.A.; O`Connor, M.; Stephenson, P.L.; Whitehouse, M.; Richards, D.G.; Hesselmann, G.; MacPhail, J.; Lockwood, F.C.; Williamson, J.; Williams, A.; Pourkashanian, M. [ETSU, Harwell (United Kingdom)

    1998-12-01

    This paper describes a UK Department of Trade and Industry-supported collaborative project entitled `The Effects of Coal Quality on Emission of Oxides of Nitrogen (NO{sub x}) and Carbon Burnout in Pulverised Coal-fired Utility Boilers`. The project involved extensive collaboration between the UK power generators, boiler and burner manufacturers and research groups in both industry and academia, together with several of the world`s leading computational fluid dynamics (CFD) `software houses`. The prime objectives of the project were to assess the relationship between NO{sub x} emissions and carbon burnout and to develop and validate predictive tools for assessing coals. Experimental work was carried out on various laboratory-scale apparatus and on single burner test facilities ranging from 160 kW{sub th} to 40 MW{sub th} in size and measurements were obtained from full-scale 500 MW{sub e} utility boiler trials. This data and basic coal data were then used to develop mathematical models to predict full-scale boiler performance with respect to NO{sub x} emissions and carbon-in-ash. Results showed good correlations for NO{sub x} and carbon burnout when comparing data from full-scale and large-scale rig trials. Laboratory-scale tests were found to be useful but the influence of burner aerodynamics was more difficult to quantify. Modelling showed that predicted NO{sub x} emissions were encouragingly close to measured emissions but predicting carbon burnout was less successful. 24 refs., 4 figs., 6 tabs.

  2. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    OpenAIRE

    Jovanović Filip P.; Berić Ivana M.; Jovanović Petar M.; Jovanović Aca D.

    2016-01-01

    This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reductio...

  3. Japan`s New Sunshine Project. 1996 Annual Summary of Coal Liquefaction and Gasification; 1996 nendo new sunshine keikaku seika hokokusho gaiyoshu. Sekitan no ekika gasuka

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    In reference to the results of the research and development under the fiscal 1996 New Sunshine Project, a report was summed up on coal liquefaction and coal gasification. As to the R and D of coal liquefaction technology, researches were conducted on liquefaction characteristics and engineering properties by coal kind, catalysts for coal liquefaction, liquefaction reaction of coal and reformation utilization of the liquefied products, liquefaction reaction mechanism and coking mechanism, solubility of coal in solvent and catalytic reaction mechanism, solvent reaction mechanism by hydrogen donor solvent, etc. Concerning the R and D of coal gasification technology, made were the basic study of eco-technology adaptable gasification technology and the study of coal gasification enhancing technology. Further, as to the development of bituminous coal liquefaction technology, carried out were the study in pilot plants and the support study of pilot plants. Additionally, R and D were done of the basic technology of coal liquefaction such as upgrading technology and environmentally acceptable coal liquefaction technology, and of coal hydrogasification technology. 3 refs., 81 figs., 25 tabs.

  4. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  5. Critical Analysis of Underground Coal Gasification Models. Part II: Kinetic and Computational Fluid Dynamics Models

    Directory of Open Access Journals (Sweden)

    Alina Żogała

    2014-01-01

    Originality/value: This paper presents state of art in the field of coal gasification modeling using kinetic and computational fluid dynamics approach. The paper also presents own comparative analysis (concerned with mathematical formulation, input data and parameters, basic assumptions, obtained results etc. of the most important models of underground coal gasification.

  6. Clean coal technology and advanced coal-based power plants

    International Nuclear Information System (INIS)

    Alpert, S.B.

    1991-01-01

    Clean Coal Technology is an arbitrary terminology that has gained increased use since the 1980s when the debate over acid raid issues intensified over emissions of sulfur dioxide and nitrogen oxides. In response to political discussions between Prime Minister Brian Mulroney of Canada and President Ronald Reagan in 1985, the US government initiated a demonstration program by the Department of Energy (DOE) on Clean Coal Technologies, which can be categorized as: 1. precombustion technologies wherein sulfur and nitrogen are removed before combustion, combustion technologies that prevent or lower emissions as coal is burned, and postcombustion technologies wherein flue gas from a boiler is treated to remove pollutants, usually transforming them into solids that are disposed of. The DOE Clean Coal Technology (CCT) program is being carried out with $2.5 billion of federal funds and additional private sector funds. By the end of 1989, 38 projects were under way or in negotiation. These projects were solicited in three rounds, known as Clean Coal I, II, and III, and two additional solicitations are planned by DOE. Worldwide about 100 clean coal demonstration projects are being carried out. This paper lists important requirements of demonstration plants based on experience with such plants. These requirements need to be met to allow a technology to proceed to commercial application with ordinary risk, and represent the principal reasons that a demonstration project is necessary when introducing new technology

  7. A ProCoS II Project Final Report: ESPRIT Basic Research project 707

    DEFF Research Database (Denmark)

    Bowen, J. P.; Hoare, C. A. R.; Langmaack, Hans

    1996-01-01

    An overview of the research and associated activities of the Europeancollaborative ESPRIT Basic Research ProCoS II project (no. 7071) on``Provably Correct Systems'' which ran from 1992 to 1995 is presented.This was a follow-on project to ProCoS (no. 3104) and ran inparallel with the ProCoS Working...

  8. ACARP Project C10059. ACARP manual of modern coal testing methods. Volume 1: The manual

    Energy Technology Data Exchange (ETDEWEB)

    Sakurovs, R.; Creelman, R.; Pohl, J.; Juniper, L. [CSIRO Energy Technology, Sydney, NSW (Australia)

    2002-07-01

    The Manual summarises the purpose, applicability, and limitations of a range of standard and modern coal testing methods that have potential to assist the coal company technologist to better evaluate coal performance. The first volume sets out the Modern Coal Testing Methods in summarised form that can be used as a quick guide to practitioners to assist in selecting the best technique to solve their problems.

  9. Kinetics, equilibrium, and thermodynamics investigation on the adsorption of lead(II) by coal-based activated carbon.

    Science.gov (United States)

    Yi, Zhengji; Yao, Jun; Zhu, Mijia; Chen, Huilun; Wang, Fei; Liu, Xing

    2016-01-01

    The goal of this research is to investigate the feasibility of using activated coal-based activated carbon (CBAC) to adsorb Pb(II) from aqueous solutions through batch tests. Effects of contact time, pH, temperature and initial Pb(II) concentration on the Pb(II) adsorption were examined. The Pb(II) adsorption is strongly dependent on pH, but insensitive to temperature. The best pH for Pb(II) removal is in the range of 5.0-5.5 with more than 90 % of Pb(II) removed. The equilibrium time was found to be 60 min and the adsorption data followed the pseudo-second-order kinetics. Isotherm data followed Langmuir isotherm model with a maximum adsorption capacity of 162.33 mg/g. The adsorption was exothermic and spontaneous in nature. The Fourier transform infrared spectroscopy and scanning electron microscopy analysis suggested that CBAC possessed a porous structure and was rich in carboxyl and hydroxyl groups on its surface, which might play a major role in Pb(II) adsorption. These findings indicated that CBAC has great potential as an alternative adsorbent for Pb(II) removal.

  10. ACARP Project C10059. ACARP manual of modern coal testing methods. Volume 2: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Sakurovs, R.; Creelman, R.; Pohl, J.; Juniper, L. [CSIRO Energy Technology, Sydney, NSW (Australia)

    2002-07-01

    The Manual summarises the purpose, applicability, and limitations of a range of standard and modern coal testing methods that have potential to assist the coal company technologist to better evaluate coal performance. It is presented in two volumes. This second volume provides more detailed information regarding the methods discussed in Volume 1.

  11. Environmental compatibility investigation of the Garzweiler II open cast mine project

    International Nuclear Information System (INIS)

    Oster, A.; Gaertner, D.

    1994-01-01

    Based on an EEC directive, the law on the investigation of ecological compatibility came into force in 1990. With the application of these European directives in national law, investigations to determine the ecological compatibility must now be carried out for projects to exploit brown coal. In this connection and in conjunction with the licensing procedure for Garzweiler II, Rheinbraun in 1992 for the first time compiled data on the investigations carried out to determine the ecological compatibility of an open cast mine. The data on these investigations include information on the necessity of the open cast mine and on alternative projects that have been examined, as well as a description of the project in question as regards its nature and extent. As far as the legally specified protected objects are concerned, i.e. people, water, air, nature (animals and plants, soil, climate and landscape) as well as cultural and other material objects, itemized data are furnished on the development and effects of the project and on countermeasures and the planned traffic and transport concept. (orig.) [de

  12. Studies on classifying Indian coals. Part II. A new system for grading and pricing

    Energy Technology Data Exchange (ETDEWEB)

    Tumuluri, S.G.; Shrikhande, S.K.; Rao, S.K.; Haque, R.

    1985-07-01

    The new system is self-complete through grading to pricing. It grades non-coking coal by moisture and ash contents. Coking coal is graded by GKLT coke type and ash content. Volatile matter content is used as a supporting indexer, where necessary. Through the grade data, a coal is evaluated into a single numeral which depicts the coaly matter content and its nature or effectiveness. This value, called effective coaly matter, is converted to a relative rupee value or price index/price. Pragmatics and versatility of the system are discussed.

  13. Fiscal 1999 research cooperation project report. Research cooperation on coal liquefaction technology; 1999 nendo sekitan ekika gijutsu ni kansuru kenkyu kyoryoku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the fiscal 1999 research cooperation project result on coal liquefaction technology. Cooperative FS was made on coal liquefaction technology of Indonesian coal as petroleum substituting energy. To obtain the basic data necessary for the FS, study was made on the applicability of Indonesian natural minerals as catalytic materials. Promising low-cost abundant Soroako Limonite ore showed a high catalytic activity for liquefaction reaction of Banko coal, and an excellent grindability. Improved BCL process including hydrogenation process was promising for production of high-quality coal liquid superior in storage stability with less nitrogen and sulfur contents. Survey was made on the general conditions of Tanjung Enim area including South Banko coal field concerned, and the geological features and coal seam of South Banko coal field which is composed of 3 seams including coal deposits of 6.35 hundred million tons. To study the marketability of coal liquid, survey was made on the current situation of oil, oil product standards, and blendability of coal liquid. Hydrogen for the liquefaction process can be obtained by coal gasification. (NEDO)

  14. Milliken Clean Coal Technology Demonstration Project. Environmental monitoring report, July--September 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    New York State Electric and Gas Corporation (NYSEG) has installed and is presently operating a high-efficiency flue gas desulfurization (FGD) system to demonstrate innovative emissions control technology and comply with the Clean Air Act Amendments of 1990. The host facility for this demonstration project is NYSEG`s Milliken Station, in the Town of Lansing, New York. The primary objective of this project is to demonstrate a retrofit of energy-efficient SO{sub 2} and NO{sub x} control systems with minimal impact on overall plant efficiency. The demonstration project has added a forced oxidation, formic acid-enhanced wet limestone FGD system, which is expected to reduce SO{sub 2} emissions by at least 90 percent. NYSEG also made combustion modifications to each boiler and plans to demonstrate selective non-catalytic reduction (SNCR) technology on unit 1, which will reduce NO{sub x} emissions. Goals of the proposed demonstration include up to 98 percent SO{sub 2} removal efficiency while burning high-sulfur coal, 30 percent NO{sub x} reductions through combustion modifications, additional NO{sub x} reductions using SNCR technology, production of marketable commercial-grade gypsum and calcium chloride by-products to minimize solid waste disposal, and zero wastewater discharge.

  15. Application of Biologically Activated Brown Coal in Cu(II Sorption

    Directory of Open Access Journals (Sweden)

    Andrea Beňová

    2004-12-01

    Full Text Available The removal of heavy metal ions from wastewaters using different adsorbents is currently of great interest. Adsorption of cooper ions from aqueous solutions on biologically activated brown coal was investigated. Four families of adsorbents were prepared from brown coal by microorganisms activity. There were used soi microfungi such as Aspergillus niger, Aspergillus clavatus, Penicillium glabrum and Trichoderma viride. The equilibrium of the adsorption process was well described by the Langmuir isotherm and the maximum capacity of the sorbents was determined.

  16. Report for fiscal 2000 on joint seminar for coal engineer training project; 2000 nendo sekitan gijutsusha yosei jigyo godo semina hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    This paper summarizes the contents of the joint seminar for coal engineer training project in fiscal 2000, which has been held in Tokyo on September 25, 2000. The lectures included 'Coal Resources in Gunnedah Basin - Future Coal Supply Potential and Geophysical Exploration' by Ms. Julie Ann Moloney, senior geographical engineer at NSW Department of Mineral Resources, Australia, 'Human Resources Development for Coal Mining in Indonesia' by Mr. Bangun Usman Harahap at the Ministry of Mines and Energy in Indonesia, 'Queensland Rail, a strategic partner - linking Coal Producers to World Markets' by Mr. John Stuart Burrows at Coal Queensland Rail, Australia, and 'The export coal mines of western Canada - A review' by Mr. Ron Smyth, director BC Geological Survey Branch, Ministry of Energy and Mines, British Columbia, Canada. Questions and answers were exchanged actively for these lectures. (NEDO)

  17. Report for fiscal 2000 on joint seminar for coal engineer training project; 2000 nendo sekitan gijutsusha yosei jigyo godo semina hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    This paper summarizes the contents of the joint seminar for coal engineer training project in fiscal 2000, which has been held in Tokyo on September 25, 2000. The lectures included 'Coal Resources in Gunnedah Basin - Future Coal Supply Potential and Geophysical Exploration' by Ms. Julie Ann Moloney, senior geographical engineer at NSW Department of Mineral Resources, Australia, 'Human Resources Development for Coal Mining in Indonesia' by Mr. Bangun Usman Harahap at the Ministry of Mines and Energy in Indonesia, 'Queensland Rail, a strategic partner - linking Coal Producers to World Markets' by Mr. John Stuart Burrows at Coal Queensland Rail, Australia, and 'The export coal mines of western Canada - A review' by Mr. Ron Smyth, director BC Geological Survey Branch, Ministry of Energy and Mines, British Columbia, Canada. Questions and answers were exchanged actively for these lectures. (NEDO)

  18. Report on the achievements in the Sunshine Project in fiscal 1986. Surveys on coal type selection (coal type survey); 1986 nendo tanshu sentei chosa seika hokokusho. Tanshu chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The purpose of the present study is to elucidate coal quality features of different types of coals and identify the relationship between the coal quality features and the liquefaction characteristics by performing liquefaction characteristic evaluation tests. Based on the result therefrom, a method is established for coal field assessment that can estimate yield of liquefaction in coal fields and coal mines to serve for selection of coal types suitable for liquefaction. Coal quality feature surveys and liquefaction characteristics evaluation tests under the standard conditions have been completed on 48 coal types including Canadian, Australian and American coals. Elucidating the coal quality features of different coals can specify parameters for the coal quality features related to the liquefaction characteristics. Coal ranks elucidate the vitrinite reflectance, structure constituent factors the vitrinite content, composite factors the volatile matter content, quantity of heat generation, and number of H/C and O/C atoms. Investigating the relationship between the coal quality features and the liquefaction characteristics can provide fundamental data for primary screening of raw material coals for liquefaction. The result of the liquefaction characteristics evaluation test under the standard conditions can be the detailed comparative data relative to data derived from the simplified liquefaction characteristics test that is performed to estimate liquefaction yield of specific coal field and coal mine. (NEDO)

  19. NEDO coal mining structure adjustment subcommittee. 18th project report meeting; NEDO sekitan kogyo kozo chosei bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Concerning the subject matter, a NEDO (New Energy and Industrial Technology Development Organization) director Keishiro Kawamo reports on NEDO's projects designed to smoothly implement the 'new coal policy'. Nobuaki Terasaka, chief of the planning division, coal and new energy department, Agency of Natural Resources and Energy, takes up the current status of the coal policy and the tasks it faces, and discusses, predicting the development of the coal policy, the assurance of stable supply of coal from abroad, development of clean coal technologies that will rightly deal with the world-wide environmental problems, and the international diffusion of the clean coal technologies and the completion of the basement therefor. Concerning the 'development of zeolite-related commodities,' a report is delivered on the manufacture of a soil improving material and a deodorant for fish grill from zeolite found rich in coal layers of Pacific Coal Mine Co., Ltd. Concerning the 'polycrystalline diamond manufacturing project,' a polycrystalline diamond synthesizing method making use of the blasting technique employed at coal mines is reported. (NEDO)

  20. Nuclear economics 2000: Deterministic and probabilistic projections of nuclear and coal electric power generation costs for the year 2000

    International Nuclear Information System (INIS)

    Williams, K.A.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1987-06-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base-load nuclear and coal-fired power plants with a startup date of January 2000. For the Midwest region a complete data set that specifies each parameter used to obtain the comparative results is supplied. When based on the reference set of input variables, the comparison of power generation costs is found to favor nuclear in most regions of the country. Nuclear power is most favored in the northeast and western regions where coal must be transported over long distances; however, coal-fired generation is most competitive in the north central region where large reserves of cheaply mineable coal exist. In several regions small changes in the reference variables could cause either option to be preferred. The reference data set reflects the better of recent electric utility construction cost experience (BE) for nuclear plants. This study assumes as its reference case a stable regulatory environment and improved planning and construction practices, resulting in nuclear plants typically built at the present BE costs. Today's BE nuclear-plant capital investment cost model is then being used as a surrogate for projected costs for the next generation of light-water reactor plants. An alternative analysis based on today's median experience (ME) nuclear-plant construction cost experience is also included. In this case, coal is favored in all ten regions, implying that typical nuclear capital investment costs must improve for nuclear to be competitive

  1. Projected costs of generating electricity from nuclear and coal-fired power stations for commissioning in 1995

    International Nuclear Information System (INIS)

    1986-01-01

    This report updates and extends the previous NEA study, ''The Costs of Generating Electricity in Nuclear and Coal-fired Power Stations'', published by the OECD in late 1983. Despite the changed expectations concerning coal prices and the considerable movements in exchange rates since the first study was completed, the conclusions remain essentially the same. Nuclear Power is projected to be economically superior by a significant margin to coal-fired plants for base load electricity production in Europe, Japan and some regions of North America. In areas of North America in close proximity to supplies of cheap coal, this would be the more economic fuel, unless future nuclear investment costs can be reduced to match the best US and Canadian experience. In all regions considered, the economic advantage of both coal and nuclear over oil and gas-fired plants for commissioning in the mid-1990s is expected to be substantial. These conclusions are based on an analysis of cost projections for 900 MWe to 1400 MWe Light Water Reactors to be commissioned in 1995, operating at a levelised load factor of about 72 per cent over an assumed 25 years economic life and calculated with a 5 per cent (real) discount rate. This parallels the reference reactor selected for the NEA report ''The Economics of the Nuclear Fuel Cycle'', which was published by the OECD in June 1985, though it deviates somewhat from the reference conditions of the previous generation cost study. Contemporary coal-fired stations ranging in capacity from 330 MWe to 700 MWe with the same assumed economic life and load factor provide the basis for comparison. Some data are included on CANDU Pressurised Heavy Water Reactors, and a brief comment is annexed on the relevance of the comparisons for the smaller plants that may be of interest to countries with smaller electricity networks or where special circumstances apply

  2. Report to Congress: Expressions of interest in commercial clean coal technology projects in foreign countries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report was prepared in response to the guidance provided by the Congress in the course of the Fiscal Year 1995 appropriations process for the Department of Energy`s (DOE) Office of Fossil Energy (FE). As described in detail below, DOE was directed to make the international dissemination of Clean Coal Technologies (CCTs) an integral part of its policy to reduce greenhouse gas emissions in developing countries. Congress directed DOE to solicit ``Statements of Interest`` in commercial projects employing CCTs in countries projected to have significant growth in greenhouse gas emissions. Additionally, DOE was asked to submit to the Congress a report that analyzes the information contained in the Statements of Interest, and that identifies the extent to which various types of Federal incentives would accelerate the commercial availability of these technologies in an international context. In response to DOE`s solicitation of 18 November 1994, 77 Statements of Interest were received from 33 companies, as well as five additional materials. The contents of these submittals, including the requested Federal incentives, the CCTs proposed, the possible host countries, and the environmental aspects of the Statements of Interest, are described and analyzed in the chapters that follow.

  3. Technical support to the Solvent Refined Coal (SRC) demonstration projects: assessment of current research and development

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, M.S.; Rodgers, B.R.; Brown, C.H.; Carlson, P.K.; Gambill, W.R.; Gilliam, T.M.; Holmes, J.M.; Krishnan, R.P.; Parsly, L.F.

    1980-12-01

    A program to demonstrate Solvent Refined Coal (SRC) technology has been initiated by the US Department of Energy (DOE) in partnership with two industrial groups. Project management responsibility has been assigned to the Oak Ridge Operations Office (ORO) of DOE. ORO requested that the Oak Ridge National Laboratory assess current research and development (R and D) activities and develop recommendations for those activities that might contribute to successful completion of the SRC demonstration plant projects. The objectives of this final report are to discuss in detail the problem areas in SRC; to discuss the current and planned R and D investigations relevant to the problems identified; and to suggest appropriate R and D activities in support of designs for the SRC demonstration plants. Four types of R and D activities are suggested: continuation of present and planned activities; coordination of activities and results, present and proposed; extension/redirection of activities not involving major equipment purchase or modifications; and new activities. Important examples of the first type of activity include continuation of fired heater, slurry rheology, and slurry mixing studies at Ft. Lewis. Among the second type of activity, coordination of data acquisition and interpretation is recommended in the areas of heat transfer, vapor/liquid equilibria, and physical properties. Principal examples of recommendations for extension/redirection include screening studies at laboratory scale on the use of carbonaceous precoat (e.g., anthracite) infiltration, and 15- to 30-day continuous tests of the Texaco gasifier at the Texaco Montebello facility (using SRC residues).

  4. MANHATTAN DISTRICT HISTORY PROJECT Y THE LOS ALAMOS PROJECT VOL. II AUGUST 1945 THROUGH DECEMBER 1946

    Energy Technology Data Exchange (ETDEWEB)

    Truslow, E. C.; Smith, R. C.

    1961-12-01

    THESE TWO VOLUMES CONSTITUTE A RECORD OF THE TECHNICAL, ADMINISTRATIVE , AND POLICY-MAKING ACTIVITIES OF THE LOS ALAMOS PROJECT (PROJECT Y) FROM ITS INCEPTION UNDER THE MANHATTAN DISTRICT THROUGH THE DEVELOPMENT OF THE ATOMIC BOMB (VOL. I), AND DURING THE PERIOD FOLLOWING THE END OF WORLD WAR II UNTIL THE MANHATTAN DISTRICT RELINQUISHED CONTROL TO THE ATOMIC ENERGY COMMISSION AS OF JANUARY 1947 (VOL. II). ALTHOUGH SEC URITY REGULATIONS HAVE REQUIRED SOME DELETIONS IN THE ORIGINAL TEXT OF THE TWO VOLUMES, EVERY EFFORT HAS BEEN MADE TO RETAIN THE ORIGINAL LANGUGAGE AND EXPERSSIONS OF THE AUTHORS.

  5. Hoe Creek II field experiment on underground coal gasification, preliminary results

    Energy Technology Data Exchange (ETDEWEB)

    Aiman, W.R.; Thorsness, C.B.; Hill, R.W.; Rozsa, R.B.; Cena, R.; Gregg, D.W.; Stephens, D.R.

    1978-02-27

    A second in-situ coal gasification experiment was performed by Lawrence Livermore Laboratory at Hoe Creek in Wyoming. The Linked Vertical Wells scheme for in-situ coal gasification was used. The experiment took 100 days for air flow testing, reverse combustion linking, forward combustion gasification, and post-burn steam flow. Air was used for gasification except for a 2-day test with oxygen and steam. Reverse combustion linking took 14 days at 1.6 m/day. Air requirements for linking were 0.398 Mgmol per meter of link assuming a single direct link. The coal pyrolysed during linking was 17 m/sup 3/, which corresponds to a single link 1.0 m in diameter. There was, however, strong evidence of at least two linkage paths. The detected links stayed below the 3 m level in the 7.6 coal seam; however, the product flow from the forward-burn gasification probably followed the coal-overburden interface not the reverse burn channels at the 3 m level. A total of 232 Mgmols (194 Mscf) of gas was produced with heating value above 125 kJ/mol (140 Btu/scf) for significant time periods and an average of 96 kJ/mol (108 Btu/scf). During the oxygen-steam test the heating value was above 270 kJ/gmol (300 Btu/scf) twice and averaged 235 kJ/gmol (265 Btu/scf). The coal recovery was 1310 m/sup 3/ (1950 ton). Gasification was terminated because of decreasing product quality not because of burn through. The product quality decreased because of increasing underground heat loss.

  6. Multi-objective Optimization of Coal-fired Boiler Combustion Based on NSGA-II

    OpenAIRE

    Tingfang Yu; Hongzhen Zhu; Chunhua Peng

    2013-01-01

    NOx emission characteristics and overall heat loss model for a 300MW coal-fired boiler were established by Back Propagation (BP) neural network, by which the the functional relationship between outputs (NOx emissions & overall heat loss of the boiler) and inputs (operational parameters of the boiler) of a coal-fired boiler can be predicted. A number of field test data from a full-scale operating 300MWe boiler were used to train and verify the BP model. The NOx emissions & heat loss pr...

  7. Fiscal 1999 report on results of joint demonstrative project for environmentally benign coal utilization system. Demonstrative project concerning coal preparation technology (China); 1999 nendo kankyo chowagata sekitan riyo system kyodo jissho jigyo seika hokokusho. Sentan gijutsu ni kakawaru jissho jigyo (Chugoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This paper describes the demonstrative project for coal preparation technology, as a part of the measures against environmental pollution due to the structuring of demonstration and dissemination basis for clean coal technologies in China, The results for fiscal 1999 is reported. In the utilization of coal in China, a problem of urgency is the highly efficient selection and removal of sulfur contents in raw coal. Coal production in Chongquing City is yearly 30 million tons, of which 90% contains sulfur contents of 3% or higher. At Jinjia Colliery of Panjiang Coal and Electric Co. Ltd., Guizhou Province, a site for the present project, a number of coal seams are unsuitable for single utilization because of high sulfur contents. The coal preparation technologies to be introduced are expected to improve coal preparation efficiency and desulfurization ratio in terms of both the washability of raw coal and the accuracy of the coal washer. This is the third year of the project, with the following activities performed, namely, research/design, manufacturing/procurement of equipment, design for construction work, training of operators or the like, and documentation. The manufacturing and procurement are for such equipment as vacuum disk filter with accessories, waste water thickener, pressure filter for tailings with accessories, flocculant pump/piping, slurry tank/pump, high-shear mixer with accessories, and electric instrumentation. All the equipment arrived at the site in January, 2001. (NEDO)

  8. Technical engineers exchange project (coal mine technology field). Training in China; Gijutsusha koryu jigyo (tanko gijutsu bun`ya). Chugoku no kenshu ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Adachi, T. [Japan Coal Energy Center, Tokyo (Japan)

    1998-07-01

    The paper described JCOAL`s project on the exchange of technical coal engineers of China. In the project on sending of engineers to China in the first term, coal mine engineers of Japan (Taiheiyo Coal Mine, Kushiro Works, Training Center) were sent to the Daitun coal-thermal power plant, Peixuan city, Jiangsu province, in September, 1997 to introduce the production control technology in Japan. They contributed to the heightening of productivity in coal mines in China. Eighteen Chinese participated in the training. Mechanization has been comparatively well in progress, and it was 83% in coal mining and 91% in drilling. The kind of coal is mostly a raw material coal. The stuff members are 30,000, and expert engineers are 4,200. The plant has an output of 130,000 kWh, owns its railroad, is run on the general multiple management, and is largely developing. The project on sending of engineers to China in the last term was carried out in February 1998 for tracing/confirming how the results of the training conducted in September are made the most of and if or not there is something bad and for obtaining the detailed data. A certain degree of promotion and effects were able to be confirmed. A project on training of the head, sub-head, etc. who were invited to Japan to lean production/management control was also carried out in November and December 1997. 1 tab.

  9. Influencing factors of public support for modern coal-fired power plant projects: An empirical study from China

    International Nuclear Information System (INIS)

    Liu, Feng; Lyu, Tao; Pan, Li; Wang, Fei

    2017-01-01

    With the development of clean coal technology, modern coal-fired power plants have achieved the similar emission standards as gas power plants. However, due to the impressions of high pollution and high emission in traditional coal-fired power plants, such projects are often opposed by local residents, which hinder the promotion of this technology. This manuscript aims to investigate public attitudes toward these projects and to analyze the influencing mechanisms of the factors of public support. The conceptual model was built with sense of place, trust and environmental attitude as the independent variables, benefit and cost perceptions as the mediating variables and public support as the dependent variable. The model was tested and modified by structural equation modelling. The results revealed that sense of place had a slight indirect impact (−0.043) on public support through benefit perception, whereas trust had a direct impact (0.332) on public support and indirect impacts (0.298) through benefit and cost perceptions. Environmental attitude had indirect impacts on public support through benefit perception (0.180) and cost perception (−0.115). In addition, policy suggestions on decision-making, project publicity and compensation strategy are proposed to enhance public support for similar projects. - Highlights: • This manuscript aims at eliminating the NIMBY effects on modern coal-fired power plant project. • A SEM model is proposed to explore how potential factors affect public support. • Trust is the dominant influencing factor to improve public support with both direct and indirect impacts. • Environmental attitude can also have positive effect on public support through rational compensation plans.

  10. 78 FR 41946 - Notice of Competitive Coal Lease Sale Maysdorf II North, WY

    Science.gov (United States)

    2013-07-12

    ... of the Powder River Basin. The tract will be leased to the qualified bidder of the highest cash amount provided that the high bid meets or exceeds the BLM's estimate of the fair market value (FMV) of... stripping ratio of the coal in bank cubic yards per ton is approximately 4.5:1. Potential bidders for the...

  11. Mechanization of operations in underground workings in coal mines and research project trends. [Poland

    Energy Technology Data Exchange (ETDEWEB)

    Reich, K; Skoczynski, W; Sikora, W

    1985-01-01

    Structure of black coal reserves of Poland, imported and Polish made equipment for underground mining, prospects for mechanization of selected operations in underground mines and research programs of the KOMAG Center for Mechanization of Mining are evaluated. Prospects for longwall mining with caving or stowing in thick coal seams (slice mining), thin (0.8 to 1.2 m), level or inclined coal seams and steep seams are analyzed. The following equipment for mechanization of underground mining is evaluated: integrated face systems, shearer loaders, chain conveyors, belt conveyors, coal plows, equipment for mine drivage, hoists, drive systems for mining equipment. The following research programs of the KOMAG Center are reviewed: modernization of face systems for coal seams with uncomplicated mining conditions, development of equipment for thin seam mining, development of types of mining equipment for coal seams from 1.5 to 3.0 m thick with dip angles to 25 degrees, modernization of equipment for thick seam mining, increasing efficiency of mine drivage (new types of heading machines, materials handling equipment for mine drivage), mechanization of auxiliary operations in underground coal mines, improving quality of mining equipment, development of equipment for coal preparation, increasing occupational safety in underground mining.

  12. Staunton 1 Reclamation Demonstration Project. Progress report II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process on a 13.8-ha abandoned deep coal mine refuse site in southwestern Illinois. The procedure included collection of preconstruction environmental data, determination of the site's final land use, and development and implementation of a detailed site development plan. Approximately 9.3 ha of refuse material was recontoured, covered with a minimum of 30 cm of soil obtained on site, and seeded with a mixture of grasses and legumes. Hydrologic investigation indicates some improvement in groundwater quality. Surface water quality also has shown improvement, but development of the aquatic ecosystem in the newly-constructed pond is slow. Revegetation has been successful, and a protective plant cover has been established on most areas of the site. Soil tests indicate that acceptable plant growth media have been constructed; however, continued application of fertilizer and limestone will probably be necessary to maintain the vegetation. The soil microbial community has achieved total numbers equal to those of old fields, but species' diversity is low. Small mammals, birds, reptiles, and amphibians have invaded and are utilizing the site. The economic value of the site and adjacent property has increased substantially, and the area's aesthetic value has been enhanced significantly. The two-year period of intensive monitoring and evaluation has been utilized to develop recommendations for improving the designs of future reclamation efforts.

  13. The PEP-II project-wide database

    International Nuclear Information System (INIS)

    Chan, A.; Calish, S.; Crane, G.; MacGregor, I.; Meyer, S.; Wong, J.

    1995-05-01

    The PEP-II Project Database is a tool for monitoring the technical and documentation aspects of this accelerator construction. It holds the PEP-II design specifications, fabrication and installation data in one integrated system. Key pieces of the database include the machine parameter list, magnet and vacuum fabrication data. CAD drawings, publications and documentation, survey and alignment data and property control. The database can be extended to contain information required for the operations phase of the accelerator and detector. Features such as viewing CAD drawing graphics from the database will be implemented in the future. This central Oracle database on a UNIX server is built using ORACLE Case tools. Users at the three collaborating laboratories (SLAC, LBL, LLNL) can access the data remotely, using various desktop computer platforms and graphical interfaces

  14. Fiscal 1995 survey report on the environmentally friendly type coal utilization system joint demonstration project. Water-saving coal preparation system joint demonstration project; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This project makes demonstration of clean coal technology (CCT) in China and preparation for the base of its spread, controlled environmental pollution due to the coal use by the countries concerned, and contributes to stably secure energy of Japan. The paper made analog operation in the 1960s-1970s, supported by Russia and Poland, introduced two computer systems for operational control and quality control, densimeter, level meter, flow meter and analyzer to coal preparation plants having problems on productivity and quality control, made the optimum operational diagnosis for the plants, and at the same time, demonstrated the comprehensive rehabilitation type system by which water saving, high quality and high effectiveness are obtained. Various types of sensors such as rapid ash meter, scale and densitometer and computers are introduced to coal preparation plants which were recently constructed in China, have jig or heavy liquid cyclone as main preparation equipment and conducts operational control. There, the central control system was demonstrated in which various information collected in the central operation room and in-site equipment is combined by network for high-grade data processing and water saving is achieved. 50 figs., 11 tabs.

  15. Grey relation projection model for evaluating permafrost environment in the Muli coal mining area, China

    Energy Technology Data Exchange (ETDEWEB)

    Wei Cao; Yu Sheng; Yinghong Qin; Jing Li; Jichun Wu [Chinese Academy of Sciences, Lanzhou (China). State Key Laboratory of Frozen Soil Engineering

    2010-12-15

    This study attempts to estimate the current stage of the permafrost environment in the Muli coal mining area, an opencast mining site in the Qinghai-Tibet plateau, China. The estimation is done by regarding this site's permafrost environment as a system which was divided into three subsystems consisting of permafrost freeze-thaw erosion sensibility, permafrost thermal stability, and permafrost ecological fragility. The subsystems were characterized with their influencing indicators, each of which was assigned with a weight according to analytic hierarchy process. The relationship between these indictors is established using an environmental evaluation model based on grey system theory. The evaluated results show that currently the normalised grey relation projection values (GRPV) of permafrost freezing-thawing erosion sensibility, permafrost thermal stability, permafrost ecological fragility and permafrost environment are 0.58 (general situation), 0.47 (bad situation), 0.63 (general situation) and 0.56 (general situation), respectively. These values imply that the permafrost environment has been deteriorated to a certain degree by human activities and potentially could be further degraded. However, at this degree, a new equilibrium could be achieved if the current environmental degradation ratio is held and if effective treatments are constructed against further damages.

  16. Report on the coal group in the Sunshine Project in fiscal 1988. Studies on a coal treatment technology in the initial process in liquefaction; 1989 nendo ekika shoki kotei ni okeru sekitan shori gijutsu no kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-03-01

    This paper reports the achievements in the Sunshine Project in fiscal 1988 in studies on the studies of the initial process in liquefaction. It is intended to identify the swelling phenomenon in coal particles in the coal slurry preparation and preheating processes, and change in the slurry viscosity associated with the heating. The slurry viscosity starts decreasing from around 300 degrees C at which the liquefying reaction begins, and decreases sharply at around 350 degrees C. Therefore, rise in the viscosity at temperatures below 300 degrees C is caused by factors other than the liquefying reaction. The rise starting at 100 to 120 degrees C is due to absorption of the solvent by coal. The rise starting at 210 to 260 degrees C requires further discussions. The equilibrium swelling ratio was measured on different types of coals by using the hydrogenated anthracene oil solvent. No coals swelled at 100 degrees C. The temperature of 200 degrees C largely divides coals into those swelling and those not swelling. At 300 degrees C, the coals were divided into those shrinking after largely swelling, those not swelling and those swelling monotonously. For consideration of the utilization as an auxiliary solvent, petroleum-based heavy oil was used to perform coal liquefaction to discuss effects of the solvent on the liquefaction rates. (NEDO)

  17. Project to develop and demonstrate methods to eliminate frozen coal handling problems. Status report I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-15

    For too many years, problems associated with frozen coal have plagued the companies who mine it, the companies who handle it in transit and the utilities and other industrial concerns that finally burn it. But never before has the magnitude of the frozen coal problem been as great as it is today because of two primary factors, i.e. (1) the majority of coal currently transported and used has been ground to a very fine mesh that absorbs water readily, thus providing more surface area for freezing, and (2) the substantially increased importance of coal, indeed, the now critical necessity for more coal to be used in displacing dangerously uncertain foreign oil supplies that currently account for 50 percent of our daily domestic oil consumption. Frozen coal problems can and do have a devastating effect upon the ability to provide energy from coal during harsh winter months when it is not needed. The majority of these problems have been involved with removing frozen coal from rail cars. To allay the problem, numerous techniques have been tried, all with some measure of success. As an example, certain chemicals have been sprayed on the coal; another common treatment has been widespread use of thaw sheds, which, whether electrically or gas-fired, are all energy intensive, time consuming, hard on rail equipment and expensive to operate over long periods of time. From sledge hammers and crow bars to gas-fired jets and electric thaw sheds, available mechanical de-icing methods often damage coal handling equipment, are time consuming and, therefore, very expensive when demurrage losses must be added to significant investment and/or operating costs.

  18. FY 2000 international exchange project on exchanges of engineers - Coal mine technology field. Overseas workshop (China); 2000 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Chugoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of making technical exchanges with coal mine related engineers in China and surveying levels of coal production technology and the needs in China and possibilities of technology transfer from Japan, workshop was held and technical tours were made. On December 13, 2000, a workshop was held in China which was named 'Japan-China Joint Coal Project Workshop: Environment/Production/Security.' Participants were 112 including 16 from Japan and 96 from China. Subjects were as follows: subjects on coal resource and technical strategy in the 21st century, technical exchange project and technical development, Japan-China technical cooperation project, report on the operational situation of China Coal Industry Environmental Preservation Safety Training Center, Japan-China Joint Project on spontaneous combustion prevention technology, CMG recovery/utilization system joint demonstration project, Japan-China joint coal exploration project, Japan-China coal field geology joint exploration project, etc. (NEDO)

  19. The continual fuel management modification in Qinshan project II

    International Nuclear Information System (INIS)

    Ye Guodong; Pan Zefei; Zhang Xingtian

    2010-01-01

    The fuel management strategy is the basis of the nuclear power plants. The performance of the fuel management strategy affects the plants' safety and economy indicators directly. The paper summarizes all the modifications on the fuel management work in Qinshan Project II since the plant was established. It includes the surveillance system of physics tests, fetching in high performance fuel assemblies, reloading pattern optimization, and the modifications of the final safety analysis report. At the same time, it evaluates the benefit of the modifications in the few years. The experience in this paper is much helpful and could be implemented on the same type plants. (authors)

  20. Engineer exchanging project (coal mine technology field) in fiscal 1999. International information exchanging project (advance survey on Russia); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Roshia)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This advance survey on Russia has performed visiting surveys and information collection at coal related organizations inside Japan and in overseas countries on production technology levels, trends and technology exchange needs in overseas coal producing countries. The project is intended to serve for improvement in the contents of and smooth execution of the engineer exchange project in the 'coal mine technology field. It was carried out by expertise people as the site surveys and the engineer reception and exchange surveys. Because of the economic crisis that has hit Russia in 1998, unprofitable coal mines were closed one after another under the coal mine scrap and build policy under the initiative of the World Bank. This situation is giving serious impacts on coal mines in the Far East Russia and the coastal areas. However, the importance of coal as the primary energy source has not been changed at all in the Far East Russia. Thus, the areas have fallen into a situation that they must rely on a great amount of introduced and imported coals as a result of weakening in coal mines in the Far Eastern area on the other hand. This paper reports mainly the situation in which the coal industries in the coastal areas are placed, and the possibilities of technology exchange. (NEDO)

  1. FY 2000 survey of the geological structure overseas, etc. Japan-China joint coal exploration - Yu Xian project; 2000 nendo kaigai chishitsu kozo nado chosa - futai shiryoshu. Nippon Chugoku sekitan kyodo tansa Yu Xian project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    This data book summarized the proceedings and the technical report of the management committee on the Japan-China geological structure survey based on the consultation concluded between NEDO and China's bureau of coal field geology and a report meeting on the Yu Xian project. In the exploration, conducted were the boring survey of 10 boreholes, seismic survey of 2D (71 traverse lines, 180.105km) and 3D (1.5km{sup 2}), VSP (6 holes (345 shots)) and the low velocity band survey (2,072 shots). The geological structure of the area presented the syncline structure with a gentle line associated with foldings and a number of faults and was classified into the medium class or the class of a little complication in the Chinese standard. The number of the faults confirmed in this exploration totaled 57. Coal reserves by coal seam were 157.22 million tons at No. 5 seam and 102.57 million tons at No. 1 seam. The total amount of the two seams was 79.1% of the total coal amount in all area. The coal quality of Nos. 1 and 5 was brown coal - flame coal in the Chinese classification, and subbituminous coal B - subbituminous coal C in the ASTM classification. The coal, however, cannot be used for process raw coal. There is a technical potentiality of the fixed bed pressurized gasification. (NEDO)

  2. Fiscal 1999 engineer exchange project (field of coal mining technology), international exchange project. Domestic workshop; 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kokunai workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The domestic workshop invites Japanese engineers and engineers from coal producing countries for the exchange of coal mining technologies and aims to substantiate and facilitate the dispatching and receiving of engineers under training programs. The main subject of the Asia-Pacific coal technology workshop was 'Coal for the 21st century - resources and technology,' and there were two sessions held on September 8, titled 'Trends and tasks of coal resources exploitation' and 'Coal resources and production technology.' Lectures were delivered by five overseas and five Japanese coal engineering experts. On September 9, nine essays were presented concerning 'Coal resources and security problems' and 'Coal resources and environmental problems.' In addition, a panel discussion was held, titled 'Coal resources assessment and technology.' Importance was emphasized of the correct assessment of the magnitude of resources, development of probing technologies to collect more detailed information, improvement of digging speeds applicable to faces for large and high-efficiency mining, development of coal mining technologies for increased recovery, etc. Information was exchanged on various occasions and partnership was enhanced between the participants to the advantage of engineer exchanging projects in the future. (NEDO)

  3. Experimental research on combustion fluorine retention using calcium-based sorbents during coal combustion (II)

    Energy Technology Data Exchange (ETDEWEB)

    Qi, Q.; Ma, X.; Liu, J.; Wu, X.; Zhou, J.; Cen, K. [Liaoning Technical University, Fuxin (China). College of Resource and Environment Engineering

    2008-12-15

    Fluoride pollution produced by coal burning can be controlled with the calcium-based sorbent combustion fluorine technique in which calcium-based sorbents are mixed with the coal or sprayed into the combustion chamber. In a fixed bed tube furnace combustion experiment using one calcium-based natural mineral, limestone and one calcium-based building material, it was shown that the calcium-based sorbent particle grain size and pore structure have a big influence on the combustion fluorine retention effect. Reducing the calcium-based sorbent particle grain size and improving the calcium sorbent structure characteristics at very high temperature to enhance the fluorine retention effect is the important approach to the fluorine retention agent development. 8 refs., 1 fig., 5 tabs.

  4. British Coal Compass Project summary: colliery based manpower, personnel, scheduling and safety systems and processes

    Energy Technology Data Exchange (ETDEWEB)

    Long, V. (Oasis Group PLC (United Kingdom))

    1994-01-01

    In early 1991, British Coal reviewed its existing personnel and manpower planning systems and concluded they were inadequate for the future needs of the business. With wages accounting for 40% British Coal's 1990/91 operational costs, the Corporation targeted manpower management as an area to deliver further improvements. British Coal's strategy to continue to improve productivity required payroll and personnel related systems which could support new flexible working hours and variable shifts. This strategy would enable machine running time to be increased, leading to improved productivity levels. 3 figs.

  5. Test Plan for Hydrogen Getters Project - Phase II

    International Nuclear Information System (INIS)

    Mroz, G.

    1999-01-01

    Hydrogen levels in many transuranic (TRU) waste drums are above the compliance threshold, therefore deeming the drums non-shippable to the Waste Isolation Pilot Plant (WIPP). Hydrogen getters (alkynes and dialkynes) are known to react irreversibly with hydrogen in the presence of certain catalysts. The primary purpose of this investigation is to ascertain the effectiveness of a hydrogen getter in an environment that contains gaseous compounds commonly found in the headspace of drums containing TRU waste. It is not known whether the volatile organic compounds (VOCs) commonly found in the headspace of TRU waste drums will inhibit (''poison'') the effectiveness of the hydrogen getter. The result of this study will be used to assess the feasibility of a hydrogen-getter system, which is capable of removing hydrogen from the payload containers or the Transuranic Package Transporter-II (TRUPACT-II) inner containment vessel to increase the quantity of TRU waste that can be shipped to the WIPP. Phase II for the Hydrogen Getters Project will focus on four primary objectives: Conduct measurements of the relative permeability of hydrogen and chlorinated VOCs through Tedlar (and possibly other candidate packaging materials) Test alternative getter systems as alternatives to semi-permeable packaging materials. Candidates include DEB/Pd/Al2O3 and DEB/Cu-Pd/C. Develop, test, and deploy kinetic optimization model Perform drum-scale test experiments to demonstrate getter effectiveness

  6. DECOVALEX II PROJECT Technical Report - Task 2C

    International Nuclear Information System (INIS)

    Jing, L.; Stephansson, O.; Chijimatzu, M.; Tsang, C.F.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment of T-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the

  7. DECOVALEX II PROJECT Technical Report - Task 2C

    Energy Technology Data Exchange (ETDEWEB)

    Jing, L.; Stephansson, O. [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Civil and Environmental Engineering; Boergesson, L. [Clay Technology AB, IDEON Research Center, Lund (Sweden); Chijimatzu, M. [Japan Nuclear Cycle Development Inst., Ibaraki (Japan). Waste Management and Fuel Cycle Research Center; Kautsky, F. [Swedish Nuclear Power Inspectorate (SKI), Stockholm (Sweden); Tsang, C.F. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Earth Science Div.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment ofT-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the definition

  8. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  9. Leaching behavior of coal combustion products and the environmental implication in road construction : project progress report.

    Science.gov (United States)

    2009-01-01

    The use of coal fly ash in road base and sub-base applications can provide better properties and performance, and is superior to it being otherwise disposed and becoming a possible environmental liability. Understanding the metal leaching behavior fo...

  10. Japan`s Sunshine Project. 1991 annual summary of coal liquefaction and gasification; 1991 nendo sunshine keikaku seika hokokusho gaiyoshu. Sekitan no ekika gas ka

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    Out of the research and development on the 1991 Sunshine Project, the results of coal liquefaction/gasification are reported. The basic research of coal liquefaction/gasification is conducted. The research plan for a 150 ton/day scale pilot plant (PP) is worked out for the development of bituminous coal liquefaction technology by NEDOL process. Data of PSU (Process Support Units) operation, especially, are studied. Concerning the data obtained through dismantling of the 50 ton/day PP in Australia which uses Australian Victoria coal due to completion of its operation and also obtained from its support research, they are reflected in the design of a demonstration plant, and the results are arranged for study. Research and development on refining technology of coal-derived liquid such as Illinois coal liquid and on application technology of its products are made. For the development of coal-use hydrogen production technology, conducted is the research of a high temperature gasification PP by entrained flow bed process which is the core of the coal gasification technology. Elementary study with a 2 ton/day furnace is made for the development of the entrained flow bed coal gasification combined cycle power generation system. Also conducted are PP construction, adjusting operation and the overall research operation.

  11. LLNL Underground-Coal-Gasification Project. Quarterly progress report, July-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, D.R.; Clements, W. (eds.)

    1981-11-09

    We have continued our laboratory studies of forward gasification in small blocks of coal mounted in 55-gal drums. A steam/oxygen mixture is fed into a small hole drilled longitudinally through the center of the block, the coal is ignited near the inlet and burns toward the outlet, and the product gases come off at the outlet. Various diagnostic measurements are made during the course of the burn, and afterward the coal block is split open so that the cavity can be examined. Development work continues on our mathematical model for the small coal block experiments. Preparations for the large block experiments at a coal outcrop in the Tono Basin of Washington State have required steadily increasing effort with the approach of the scheduled starting time for the experiments (Fall 1981). Also in preparation is the deep gasification experiment, Tono 1, planned for another site in the Tono Basin after the large block experiments have been completed. Wrap-up work continues on our previous gasification experiments in Wyoming. Results of the postburn core-drilling program Hoe Creek 3 are presented here. Since 1976 the Soviets have been granted four US patents on various aspects of the underground coal gasification process. These patents are described here, and techniques of special interest are noted. Finally, we include ten abstracts of pertinent LLNL reports and papers completed during the quarter.

  12. Fiscal 1997 technological survey report. Engineer exchange project - coal mine technological field (Advanced coal producing country survey - U.S.A. survey); 1997 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) senshin santankoku chosa. Beikoku chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    While the introduction and adaptation of the Longwall excavation technology were carried forward for coal producing countries in the Pacific region, U.S.A. information was collected by making tours of coal mines in the West and Washington/Colorado/Utah States, with the intention of ascertaining technological trend so as to carry out efficient technological transfer, and for the purpose of replenishing the contents and contributing to the smooth implementation of the engineer exchange project in 'coal mine technological field'. The coal reserves are 400 billion tons, with 840 million tons produced and with 80 million tons exported; not less than 56% of the U.S. domestic electricity rests on coal. Production by open-pit mining is the majority while the output by underground mining is 38%; the Longwall method has increased as a digging method, taking 18% of all digging output. The productivity is 4.24 ton/person per day and ranks as the world highest. The coal mining technological trend in the U.S. can be summarized as follows. The coal mining output in the West is increasing, with the number of mines decreasing, so that the output per mine is increasing. With the output ratio by open-pit mining increasing, the digging method in the mine is being changed to the Longwall. (NEDO)

  13. Engineering development of coal-fired high performance power systems, Phase II and III

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-04-01

    The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) that is capable of: thermal efficiency (HHV) {ge} 47%, NOx, SOx, and particulates {le} 10% NSPS (New Source Performance Standard) coal providing {ge} 65% of heat input, all solid wastes benign, and cost of electricity {le} 90% of present plants. Phase 1, which began in 1992, focused on the analysis of various configurations of indirectly fired cycles and on technical assessments of alternative plant subsystems and components, including performance requirements, developmental status, design options, complexity and reliability, and capital and operating costs. Phase 1 also included preliminary R and D and the preparation of designs for HIPPS commercial plants approximately 300 MWe in size. This phase, Phase 2, involves the development and testing of plant subsystems, refinement and updating of the HIPPS commercial plant design, and the site selection and engineering design of a HIPPS prototype plant. Work reported herein is from: Task 2.1 HITAC Combustors; Task 2.2 HITAF Air Heaters; Task 6 HIPPS Commercial Plant Design Update.

  14. Emission projections 2008-2012 versus national allocation plans II

    International Nuclear Information System (INIS)

    Neuhoff, Karsten; Ferrario, Federico; Grubb, Michael; Gabel, Etienne; Keats, Kim

    2006-01-01

    We compare the national allocation plans (NAPs), proposed and submitted by EU Member States as of October 2006, with our estimations for CO 2 emissions by the installations covered by these NAPs. The collective allocations proposed under phase II NAPs exceed the historic trend of emissions extrapolated forward. Using our projections we find, depending on uncertainty in fuel prices, economic growth rates, performance of the non-power sector and CDM/JI availability, a 15% chance of a 'dead market' with emissions below cap even at zero prices. With an expected inflow of committed CDM/JI credits of 100 MtCO 2 /year, allowance supply will exceed demand in 50% of cases without any carbon price, and in 80% of our euros20/tCO 2 scenarios. Banking of allowances towards post-2012 conditions could create additional demand, but this is difficult to anticipate and conditional on policy evolution. The proposed phase II NAPs would result in low prices and only small volumes of CDM/JI would enter the EU ETS. CDM/JI would almost exclusively be public-sector funded, placing the cost of Kyoto compliance entirely upon governments. (Author)

  15. Engineer exchanging project on coal mine technology field in fiscal 1999. International information exchanging project (advance survey on North America); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Hokubei)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project has been performed with an intention of making visiting surveys and information collection at coal related organizations in overseas coal producing countries on production technology levels and trends. The project is intended to serve for improvement in the contents of and smooth execution of the engineer exchange project in the 'coal mine technology field. It was carried out by the site surveys. The surveys revealed that the situation of the American coal industry is expected of stable increase in the demand and supply in the future, but the coal price is on the falling trend, and therefore, the industry is compelled to further increase the intensity and enhance the productivity. The industry is strongly influenced by the amended air pollution prevention act and nature destruction problems, hence further coal mine curtailment is estimated. Under such a background, it was found that the long-wall mining process progressing toward larger scale and higher productivity, and the high-wall mining process that provides higher productivity at lower cost and has less impact on the environmental problems can continue development in mountainous areas, particularly in the Appalachian area. The high-wall mining process mines coal at exposed facings on the side of a mountain by using a continuous miner, and transports the coal using machines. (NEDO)

  16. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  17. Breckinridge Project, initial effort. Report VII, Volume II. Environmental baseline report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Ashland Synthetic Fuels, Inc. (ASFI) and Airco Energy Company, Inc. (AECI) have recently formed the Breckinridge Project and are currently conducting a process and economic feasibility study of a commercial scale facility to produce synthetic liquid fuels from coal. The coal conversion process to be used is the H-COAL process, which is in the pilot plant testing stage under the auspices of the US Department of Energy at the H-COAL Pilot Plant Project near Catlettsburg, Kentucky. The preliminary plans for the commercial plant are for a 18,140 metric ton/day (24,000 ton/day) nominal coal assumption capacity utilizing the abundant high sulfur Western Kentucky coals. The Western Kentucky area offers a source of the coal along with adequate water, power, labor, transportation and other factors critical to the successful siting of a plant. Various studies by federal and state governments, as well as private industry, have reached similar conclusions regarding the suitability of such plant sites in western Kentucky. Of the many individual sites evaluated, a site in Breckinridge County, Kentucky, approximately 4 kilometers (2.5 miles) west of the town of Stephensport, has been identified as the plant location. Actions have been taken to obtain options to insure that this site will be available when needed. This report contains an overview of the regional setting and results of the baseline environmental studies. These studies include collection of data on ambient air and water quality, sound, aquatic and terrestrial biology and geology. This report contains the following chapters; introduction, review of significant findings, ambient air quality monitoring, sound, aquatic ecology, vegetation, wildlife, geology, soils, surface water, and ground water.

  18. Tanjung Enim IV coal exploration project. Volume III. Preliminary mining plan for South Arahan area

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Based on the results of the survey carried out at Tanjung Enim in South Sumatra, a mining plan in the South Arahan area was studied. The plan was studied with geological structure, coal quality and social basement facilities as restriction conditions, with the mining amount, selling price and land transportation expenses as fluctuation factors, and using the optimum mining area determination method (pit optimizer), etc. The results of the survey were classified into the following 11 items: 1) assumptions; 2) pit optimization; 3) pit design; 4) long term scheduling; 5) detailed scheduling; 6) waste dumping; 7) mining equipment model case simulation; 8) mine facilities; 9) mine economics; 10) investigation of coal transportation; 11) conclusion. In 1), study was made on geological modeling, coal quality data and mining economics. (NEDO)

  19. Dedicated OO expertise applied to Run II software projects

    International Nuclear Information System (INIS)

    Amidei, D.

    2000-01-01

    The change in software language and methodology by CDF and D0 to object-oriented from procedural Fortran is significant. Both experiments requested dedicated expertise that could be applied to software design, coding, advice and review. The Fermilab Run II offline computing outside review panel agreed strongly with the request and recommended that the Fermilab Computing Division hire dedicated OO expertise for the CDF/D0/Computing Division joint project effort. This was done and the two experts have been an invaluable addition to the CDF and D0 upgrade software projects and to the Computing Division in general. These experts have encouraged common approaches and increased the overall quality of the upgrade software. Advice on OO techniques and specific advice on C++ coding has been used. Recently a set of software reviews has been accomplished. This has been a very successful instance of a targeted application of computing expertise, and constitutes a very interesting study of how to move toward modern computing methodologies in HEP

  20. Blade System Design Study. Part II, final project report (GEC).

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its

  1. The projects of reducing environmental pollution at the collieries belonging to Petrosani Autonomous Bituminous Coal Administration

    International Nuclear Information System (INIS)

    Arad, V.; Arad, S.; Costinas, B.; Marchis, G.

    1997-01-01

    The economic development in the Jiu Valley, as practised in the mining and processing of bituminous coal, has had a dynamic character without taking into account, however, the harmful impact on the environment. The most severe problem of environmental pollution in the Jiu Valley is that of the pollution of the Jiu River due to the discharge of waste water from the technological processes of mining and processing coal. This paper presents some solutions for reducing this environmental pollution, especially the Jiu water pollution. 1 ref

  2. Report on the FY 1998 results of the New Sunshine Project (B version). Data attached 2. Development of coal liquefaction technology (Development of base technology of liquefaction (Project on internationalization of coal liquefaction technology)); 1998 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B ban). Ekika kiban gijutsu no kaihatsu (sekitan ekika gijutsu no kokusaika jigyo (fuzoku shiryo 2))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the project for internationalization of coal liquefaction technology, this paper reported on the potential survey for location of Indonesian low grade coal liquefaction (study of applicability of the improved BCL process and survey of hydrogen production technology using coal gasification). The survey was conducted of a locational possibility of a coal liquefaction commercial plant to be located at mine site in South Sumatra for Banko coal raw material. The improved BCL process was applied in which the results of the study by NBCL Takasago Research Institute were reflected. Further, the hydrogen production was studied by gasification of Banko coal, and the comparison was made with the conventional natural gas reforming method. As a result of the study using information/knowledge obtained during the conceptual design of Australian brown coal, the construction cost of commercial scale liquefaction plant with the Banko coal processing amount of 30,000 tons/day became 549.8 billion yen in the case of using natural gas as raw material for hydrogen production. This construction cost is the lowest as compared with 601.7 billion yen in the demonstrative BCL process and with 577.1 billion yen in the advanced BCL process. This is a process making use of features of Banko coal. The process for hydrogen production by the steam reforming method using natural gas has an advantage of increasing the production amount of coal-derived liquid the most of the three other methods. (NEDO)

  3. Report on the FY 1998 results of the New Sunshine Project (B version). Data attached 1. Development of coal liquefaction technology (Development of base technology of liquefaction (Project on internationalization of coal liquefaction technology)); 1998 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B ban). Ekika kiban gijutsu no kaihatsu (sekitan ekika gijutsu no kokusaika jigyo (fuzoku shiryo-1))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the project for internationalization of coal liquefaction technology, this paper reported on the potential survey for location of Indonesian low grade coal liquefaction (study of applicability of the improved BCL process and survey of hydrogen production technology using coal gasification). The survey was conducted of a locational possibility of a coal liquefaction commercial plant to be located at mine site in South Sumatra for Banko coal raw material. The improved BCL process was applied in which the results of the study by NBCL Takasago Research Institute were reflected. Further, the hydrogen production was studied by gasification of Banko coal, and the comparison was made with the conventional natural gas reforming method. As a result of the study using information/knowledge obtained during the conceptual design of Australian brown coal, the construction cost of commercial scale liquefaction plant with the Banko coal processing amount of 30,000 tons/day became 549.8 billion yen in the case of using natural gas as raw material for hydrogen production. This construction cost is the lowest as compared with 601.7 billion yen in the demonstrative BCL process and with 577.1 billion yen in the advanced BCL process. This is a process making use of features of Banko coal. The process for hydrogen production by the steam reforming method using natural gas has an advantage of increasing the production amount of coal-derived liquid the most of the three other methods. (NEDO)

  4. International exchange project for the engineer exchange project (in coal mine technology area) in fiscal 1998. Pre-survey in Europe; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Oshu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This survey in Europe surveyed the current status of the coal industry, supporting directions and policies of governments on the coal industry, and summarized the information thereof. The survey included movements in policies and activities in transfer of technologies to overseas countries by governments and corporations of different countries, and the current status of the coal technology training project. The survey covered Britain and Germany. The British coal industry is facing a serious difficulty because the electric power industry being the major coal purchaser has changes its sourcing to natural gas. In addition, the open-cut mining which has been considered high in productivity has no further hope of big progress due to regulations in the environmental aspects. However, as a result of having performed positively research and development on production cost reduction, the production efficiency has grown excellently. Using this situation as the base, positive advancement into overseas countries is being carried out. The German coal industry has, in spite of having reduced the production size and the number of coal mines, shifted coal purchasers to electric power generation and steel making areas, and its quality and supply capability stand equivalent to those of imported coals. (NEDO)

  5. Burnout, Depression and Proactive Coping in Underground Coal Miners in Serbia - Pilot Project

    Directory of Open Access Journals (Sweden)

    Manić Saška

    2017-03-01

    Full Text Available Mining is unsurprisingly considered a high-risk occupation because it involves continuous hard labour under highly demanding and stressful conditions. Many of these work stressors can impair individuals’ well-being in both a physiological and psychological sense. The aims of this study were to assess the prevalence of burnout and depressive symptoms and to evaluate aspects of proactive coping among underground coal miners in Serbia. The study involved 46 male underground coal miners. Burnout was measured with the Copenhagen Burnout Inventory, depression was assessed with the Patient Health Questionnaire-9, and level of proactive coping was measured with the Proactive Coping Inventory. The results showed a low level of burnout syndrome among the underground coal miners (12.46±4.879. Depression was slightly above the minimum (1.2±2.094, and the majority of the participants had no symptoms of depression (93.5%. Overall, the underground coal miners’ ability to proactively cope with work stress was very good (42.17±6.567. This is in contrast to the findings of the few previous international studies and is a good basis for further research using a larger sample in Serbia.

  6. Economic impacts on West Virginia from projected future coal production and implications for policymakers

    International Nuclear Information System (INIS)

    Richardson, L J; Cleetus, R; Clemmer, S; Deyette, J

    2014-01-01

    Multiple economic and geologic factors are driving fundamental changes in the nation’s energy system, weakening coal’s dominance as a fuel for electricity generation, with significant implications for places like West Virginia that are heavily dependent on coal for economic activity. Some of these factors include low natural gas prices, rising labor costs and declining productivity, economic competition with other coal mining regions, environmental regulations to reduce pollution and safeguard public health, state energy efficiency and renewable electricity standards, falling costs of renewable energy resources like wind and solar, and the likely prospect of future limits on greenhouse gas emissions. This analysis uses an input–output model to examine the effects on West Virginia’s economy from these multiple factors by exploring a range of scenarios for coal production through 2020. In addition to changes in the coal industry, hypothetical investments in additional sectors of the economy are considered as a way to gauge potential alternative economic opportunities. This paper offers recommendations to policymakers for alternative economic development strategies needed to create new jobs and diversify the state’s economy, and highlights the importance of transition assistance at the federal level. (paper)

  7. Fiscal 2000 coal engineer training project. Report on senior course; 2000 nendo sekitan gijutsusha yosei jigyo jokyu course hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The above-named course consisted of three weeks of lectures and three months of visits to coal mines and harbor facilities and tours to coal consumers such as power stations and steel manufacturing plants. The report has turned out to be an introductory manual on coal mining consisting of coal mining technologies such as coal resource exploration, coal mining, and coal preparation, and the state of Australian coal industry. The manual comprises (1) job training in Japan (attendance at lectures), (2) inspection and training in Japan (coal consumers), (3) intensified lectures at University of New South Wales (coal mining and preparation), (4) current state of Austrian coal industry, (5) inspection tours to Australian coal mines, (6) inspection tours to Australian harbor facilities, and (7) the state of Australian coal mine management. Fifteen intensified lectures were given, including the 'Overview of Australian coal industry' and 'Coal handling and transport.' Nine coal mines were visited in Queensland, and 21 in New South Wales. As for the state of Australian coal mine management, there is a trend toward contract mining but self-mining constitutes the mainstream. (NEDO)

  8. Report on investigations in fiscal 2000 on the projects to support introduction of environment friendly coal utilization system. Green helmet project for briquette production plant - Mae Moh coal mine, Thailand; 2000 nendo kankyo chowagata sekitan riyo system donyu shien jigyo chosa hokokusho. Briquette seizo setsubi ni kakawaru green helmet jigyo (Thai koku Mae Moh tanko)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    This Green Helmet Project is intended to suppress generation of environment polluting substances in association with coal utilization in Thailand by demonstrating and improving the proliferation infrastructure for the clean coal technology to be used widely in Thailand. The project is also intended to serve for stabilized assurance of energies for Japan. The demonstration project related to briquette manufacturing facilities executed as one of the 'Projects to support introduction of environment friendly coal utilization system' is intended to manufacture at low cost a briquette which is low in odor, free of smoke, and suppressed largely of sulfur oxide generation. The briquette is made by adding clayish minerals, sulfur, a fixing agent and a binder into brown coal being a low grade coal. The project implements proliferation of the technology to reduce environmental load associated with coal utilization in developing countries according to the situation and needs of the counterpart countries. The present project has performed the site surveys and guidance of operation and maintenance techniques as follow-up works of the demonstration project having been completed by cooperation between Japan and Thailand. It is considered that what had been intended in the beginning has been achieved sufficiently. (NEDO)

  9. Studies on coal vitrinoid substances and their carbonized products. Volumes I and II

    Energy Technology Data Exchange (ETDEWEB)

    Davis, A

    1965-01-01

    The purposes of this research were to investigate some of the physical and chemical properties of coal vitrinoid substances and the changes in those properties which occurred during the carbonization of the vitrinoids and to compare, wherever possible the processes of coalification and carbonization. The construction and use of a direct reading reflectometer is described and tests which revealed that the average maximum and minimum reflectances obtained from particulate blocks of vitrinoid could be accepted as approximations of the true maximum and minimum reflectances. Reflectance determinations upon oriented samples formed the basis of this research and lead to the suggestion that there are two overlapping segments of the curve relating reflectance to either carbon content of aromaticity. The apparent step in reflectance is considered to be at least partly due to a mottling of the lower-reflecting vitrinoids caused by a marked difference in appearance of various of the coalified plant cell wall layers and cell contents. Various of the properties of the vitrinoids, including behavior upon carbonization, indicated that the lower-reflecting group of vitrinoids from Northumberland and North Durham were all of lower rank than other, higher-reflecting vitrinoids, in spite of the overlapping carbon content. The changes in density, optical properties and chemical analyses of the vitrinoids following carbonization at temperatures up to 600C are described: increase in reflectance is reported for some low-rank vitrinoids carbonized at 200C and significant changes in the anisotropy of some carbonized vitrinoids are given in terms of bireflectance.

  10. Summary of FY 1980 results of Sunshine Project. Development of coal liquefaction techniques; 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sunshine keikaku itaku kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the results of the 3 R and D themes for coal liquefaction techniques, pursued by the Sunshine Project; (1) development of solvent extraction type liquefaction plant, and brown coal liquefaction technique R and D demonstration surveys, (2) development of solvolysis type liquefaction plant, and (3) development of direct hydrogenation type liquefaction plant. For the theme (1), the 1 T/D test plant, solid/liquid separator and small-size continuous settlement separator are constructed, and partly completed. The elementary studies include solvent extraction type liquefaction process, materials for coal liquefaction plant and solid/liquid separation. Australia's Victoria brown coal and Chinese coal are studied to clarify the possible problems involved in liquefaction of these coal species for commercialization of the liquefaction techniques in the early stage. The elementary techniques studied include dehydration of brown coal, milling at high temperature in oil, de-ashing, and secondary and primary hydrogenation. For the theme (2), the 1 T/D plant is inspected and maintained to clarify the problems involved in the continuous operation, revamped and repaired as necessary, given preventive maintenance, and tested for operability confirmation. The elementary studies include solvolysis type liquefaction process, scale-up, hydrogenation plant for solvolysis pitch. For the item (3), the 2.4 T/D test plant is constructed, and the elementary studies are conducted, for, e.g., liquefaction reactions in the presence of an iron-based catalyst. (NEDO)

  11. Summary of FY 1980 results of Sunshine Project. Development of coal liquefaction techniques; 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sunshine keikaku itaku kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the results of the 3 R and D themes for coal liquefaction techniques, pursued by the Sunshine Project; (1) development of solvent extraction type liquefaction plant, and brown coal liquefaction technique R and D demonstration surveys, (2) development of solvolysis type liquefaction plant, and (3) development of direct hydrogenation type liquefaction plant. For the theme (1), the 1 T/D test plant, solid/liquid separator and small-size continuous settlement separator are constructed, and partly completed. The elementary studies include solvent extraction type liquefaction process, materials for coal liquefaction plant and solid/liquid separation. Australia's Victoria brown coal and Chinese coal are studied to clarify the possible problems involved in liquefaction of these coal species for commercialization of the liquefaction techniques in the early stage. The elementary techniques studied include dehydration of brown coal, milling at high temperature in oil, de-ashing, and secondary and primary hydrogenation. For the theme (2), the 1 T/D plant is inspected and maintained to clarify the problems involved in the continuous operation, revamped and repaired as necessary, given preventive maintenance, and tested for operability confirmation. The elementary studies include solvolysis type liquefaction process, scale-up, hydrogenation plant for solvolysis pitch. For the item (3), the 2.4 T/D test plant is constructed, and the elementary studies are conducted, for, e.g., liquefaction reactions in the presence of an iron-based catalyst. (NEDO)

  12. Public views of reclaiming an abandoned coal mine: the Macoupin County project

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, J. R.

    1980-07-01

    An abandoned underground coal mine waste area in Macoupin County, Illinois, has been reclaimed for demonstration and research purposes near the city of Staunton. According to federal law, end uses of reclaimed coal mines must be determined in part by local concerns. This study examined local residents' preferences for land uses and their social and economic evaluations of reclamation at the Macoupin County site. Personal interviews with 119 residents revealed preferences for recreational use of the demonstration area; however, responses were probably influenced by prior awareness of land-use intentions. Generally, very positive evaluations of the reclamation were received. Willingness to pay for reclamation appears to be linked to fulfillment of desired recreational uses on the site and socioeconomic status of the respondent. In general, the research results provide further evidence that the value of abatement of environmental damage from mining is recognized and supported in economic terms at the public level.

  13. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    Directory of Open Access Journals (Sweden)

    Jovanović Filip P.

    2016-01-01

    Full Text Available This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reduction of the quantity of coke, whose production requires large amounts of energy, reduction of harmful exhaust emission and increase productivity of blast furnaces through the reduction of production costs. The project was complex and had high costs, so that it was necessary to predict risk events and plan responses to identified risks at an early stage of implementation, in the course of the project design, in order to minimise losses and implement the project in accordance with the defined time and cost limitations. [Projekat Ministarstva nauke Republike Srbije, br. 179081: Researching contemporary tendencies of strategic management using specialized management disciplines in function of competitiveness of Serbian economy

  14. British Coal Compass project summary: colliery based manpower, personnel, scheduling and safety systems and processes

    Energy Technology Data Exchange (ETDEWEB)

    Long, V. [Oasis Group plc (United Kingdom)

    1995-12-01

    In early 1991 British Coal reviewed its existing personnel and manpower planning systems and concluded they were inadequate for the future needs of the business. British Coal`s strategy to continue to improve productivity required payroll and personnel related systems which could support new flexible working hours and variable shifts. This strategy would enable machine running time to be increased, leading to improved productivity levels. The Corporation chose to install a distributed, integrated computer system, code named `Compass` to devolve many of the responsibilities for the management and payment of the industrial workforce from Corporate headquarters` functions to all its collieries. The system consists of eight main software systems: an on-line, real-time time and attendance system; a ristering system; a colliery personnel system; a strategic manpower planning system; a local data capture system; a central, core payroll system; a corporate personnel database; and a fail-safe, resilience system. The article describes the technology used and discusses the benefits of the system which started operations in autumn 1993. 3 figs.

  15. A sustainable livelihood framework to implement CSR project in coal mining sector

    Directory of Open Access Journals (Sweden)

    Sapna A. Narula

    2017-01-01

    Full Text Available Corporate social responsibility (CSR in mining areas has increased momentum especially in countries like India where it has been made mandatory. The primary objective of this paper is to document actual social challenges of mining in field areas and find out how companies in the coal sector can work in a systematic manner to achieve uplift of affected communities. The first part of the paper draws evidence from three different bodies of literature, i.e. CSR and coal mining, capacity building and livelihood generation in mining areas. We try to converge the literature to propose a novel framework for livelihood generation work through capacity building with the help of CSR investments. The paper also documents a live case of planning and the implementation of capacity building activities in Muriadih coal mines in the Jharkhand state of India and offers lessons to both business and policy makers. The proposed framework has only been experimented in a local context, yet has the potential to be replicated in other mining areas.

  16. Deep subsurface drip irrigation using coal-bed sodic water: part II. geochemistry

    Science.gov (United States)

    Bern, Carleton R.; Breit, George N.; Healy, Richard W.; Zupancic, John W.

    2013-01-01

    Waters with low salinity and high sodium adsorption ratios (SARs) present a challenge to irrigation because they degrade soil structure and infiltration capacity. In the Powder River Basin of Wyoming, such low salinity (electrical conductivity, EC 2.1 mS cm-1) and high-SAR (54) waters are co-produced with coal-bed methane and some are used for subsurface drip irrigation(SDI). The SDI system studied mixes sulfuric acid with irrigation water and applies water year-round via drip tubing buried 92 cm deep. After six years of irrigation, SAR values between 0 and 30 cm depth (0.5-1.2) are only slightly increased over non-irrigated soils (0.1-0.5). Only 8-15% of added Na has accumulated above the drip tubing. Sodicity has increased in soil surrounding the drip tubing, and geochemical simulations show that two pathways can generate sodic conditions. In soil between 45-cm depth and the drip tubing, Na from the irrigation water accumulates as evapotranspiration concentrates solutes. SAR values >12, measured by 1:1 water-soil extracts, are caused by concentration of solutes by factors up to 13. Low-EC (-1) is caused by rain and snowmelt flushing the soil and displacing ions in soil solution. Soil below the drip tubing experiences lower solute concentration factors (1-1.65) due to excess irrigation water and also contains relatively abundant native gypsum (2.4 ± 1.7 wt.%). Geochemical simulations show gypsum dissolution decreases soil-water SAR to 14 and decreasing EC in soil water to 3.2 mS cm-1. Increased sodicity in the subsurface, rather than the surface, indicates that deep SDI can be a viable means of irrigating with sodic waters.

  17. Nuclear magnetic resonance studies of ancient buried wood-II. Observations on the origin of coal from lignite to bituminous coal

    Science.gov (United States)

    Hatcher, P.G.; Breger, I.A.; Szeverenyi, N.; Maciel, G.E.

    1982-01-01

    Coalified logs ranging in age from Late Pennsylvania to Miocene and in rank from lignite B to bituminous coal were analyzed by 13C nuclear magnetic resonance (NMR) utilizing the cross-polarization, magic-angle spinning technique, as well as by infrared spectroscopy. The results of this study indicate that at least three major stages of coalification can be observed as wood gradually undergoes transformation to bituminous coal. The first stage involves hydrolysis and loss of cellulose from wood with retention and differential concentration of the resistant lignin. The second stage involves conversion of the lignin residues directly to coalified wood of lignitic rank, during which the oxygen content of intermediate diagenetic products remains constant as the hydrogen content and the carbon content increases. These changes are thought to involve loss of methoxyl groups, water, and C3 side chains from the lignin. In the third major stage of coalification, the coalified wood increases in rank to subbituminous and bituminous coal; during this stage the oxygen content decreases, hydrogen remains constant, and the carbon content increases. These changes are thought to result from loss of soluble humic acids that are rich in oxygen and that are mobilized during compaction and dewatering. Relatively resistant resinous substances are differentially concentrated in the coal during this stage. The hypothesis that humic acids are formed as mobile by-products of the coalification of lignin and function only as vehicles for removal of oxygen represents a dramatic departure from commonly accepted views that they are relatively low-molecular-weight intermediates formed during the degradation of lignin that then condense to form high-molecular-weight coal structures. ?? 1982.

  18. Report on the achievements in the Sunshine Project. A comprehensive report on development of coal liquefaction technologies and a performance test on Chinese coal liquefaction (fiscals 1981 through 1987); Sekitan ekika gijutsu kaihatsu seika hokokusho. Chugokutan ekika seino shiken sogo hokokusho (1981 nendo kara 1987 nendo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The present Japan-China joint development project is intended to study liquefaction performance of different types of Chinese coals, select coal types suitable for coal liquefaction, and serve for enhancement in the coal liquefaction technologies employed by the Chinese side. Since a small continuous testing device has been installed in fiscal 1982 and begun with the trial operation in March 1983, the liquefaction test has been performed for about five years, and is scheduled to continue another three years. Chinese coals produced in seven provinces and two autonomous regions have been subjected to the coal type selection, on which discussions were given for liquefying reaction characteristics by using autoclave testing and small continuous testing devices. As a result, circulation tests were performed by the end of fiscal 1987 on five coal types, namely Beisu coal, Texgxian coal, Xianfeng coal, Shenmu coal, and Meihekou coal. Data were acquired during the circulation and at the equilibrium. Comparison of the results of tests on these five coal types with the results having been acquired from the 0.1-t/d BSU in Japan before modification verified the result being nearly reasonable. (NEDO)

  19. Paiton II financing locked up

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The 2 x 610 MW Paiton II coal-fired independent power project in Indonesia became a reality last week with the completion of a 1.36 billion dollars commercial financing for the 1.65 billion dollar undertaking. Details of the financing are given. A table lists Indonesia`s independent power projects and their current status.

  20. Removal of Pb(II) from wastewater using Al2O3-NaA zeolite composite hollow fiber membranes synthesized from solid waste coal fly ash.

    Science.gov (United States)

    Zhu, Li; Ji, Jiayou; Wang, Shulin; Xu, Chenxi; Yang, Kun; Xu, Man

    2018-09-01

    Al 2 O 3 -NaA zeolite composite hollow fiber membranes were successfully fabricated via hydrothermal synthesis by using industrial solid waste coal fly ash and porous Al 2 O 3 hollow fiber supports. The as-synthesized Al 2 O 3 -NaA zeolite composite hollow fiber membranes were then characterized by scanning electron microscopy (SEM) and X-ray diffraction (XRD). The hollow fiber membranes were used to remove lead ions (Pb(II), 50 mg L -1 ) from synthetic wastewater with a removal efficiency of 99.9% at 0.1 MPa after 12 h of filtration. This study showed that the Al 2 O 3 -NaA zeolite composite hollow fiber membranes (the pore size of the membrane was about 0.41 nm in diameter) synthesized from coal fly ash could be efficiently used for treating low concentration Pb(II) wastewater. It recycled solid waste coal fly ash not only to solve its environment problems, but also can produce high-value Al 2 O 3 -NaA zeolite composite hollow fiber membranes for separation application in treating wastewater containing Pb(II). Copyright © 2018 Elsevier Ltd. All rights reserved.

  1. Indonesian coal export potential

    International Nuclear Information System (INIS)

    Millsteed, Ch.; Jolly, L.; Stuart, R.

    1993-01-01

    Indonesia's coal mining sector is expanding rapidly. Much of the increase in coal production since the mid-1980s has been exported. Indonesian coal mining companies have large expansion programs and continuing strong export growth is projected for the remainder of the 1990s. The low mining costs of indonesian coal, together with proximity to Asian markets, mean that Indonesia is well placed to compete strongly with other thermal coal exporters and win market share in the large and expanding thermal coal market in Asia. However, there is significant uncertainty about the likely future level of Indonesia's exportable surplus of coal. The government's planned expansion in coal fired power generation could constrain export growth, while the ability of producers to meet projected output levels is uncertain. The purpose in this article is to review coal supply and demand developments in Indonesia and, taking account of the key determining factors, to estimate the level of coal exports from Indonesia to the year 2000. This time frame has been chosen because all currently committed mine developments are expected to be on stream by 2000 and because it is difficult to project domestic demand for coal beyond that year. 29 refs., 8 tabs., 7 figs

  2. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  3. Managing produced water from coal seam gas projects: implications for an emerging industry in Australia.

    Science.gov (United States)

    Davies, Peter J; Gore, Damian B; Khan, Stuart J

    2015-07-01

    This paper reviews the environmental problems, impacts and risks associated with the generation and disposal of produced water by the emerging coal seam gas (CSG) industry and how it may be relevant to Australia and similar physical settings. With only limited independent research on the potential environmental impacts of produced water, is it necessary for industry and government policy makers and regulators to draw upon the experiences of related endeavours such as mining and groundwater extraction accepting that the conclusions may not always be directly transferrable. CSG is widely touted in Australia as having the potential to provide significant economic and energy security benefits, yet the environmental and health policies and the planning and regulatory setting are yet to mature and are continuing to evolve amidst ongoing social and environmental concerns and political indecision. In this review, produced water has been defined as water that is brought to the land surface during the process of recovering methane gas from coal seams and includes water sourced from CSG wells as well as flowback water associated with drilling, hydraulic fracturing and gas extraction. A brief overview of produced water generation, its characteristics and environmental issues is provided. A review of past lessons and identification of potential risks, including disposal options, is included to assist in planning and management of this industry.

  4. Equipment sizing in a coal-fired municipal heating plant modernisation project with support for renewable energy and cogeneration technologies

    International Nuclear Information System (INIS)

    Kalina, Jacek

    2014-01-01

    Highlights: • Sizing of biomass fired cogeneration block is performed for existing heating plant. • Mathematical model for cogeneration block optimisation is presented. • Impact of financial support mechanisms on optimal solution is discussed. • Influence of short term variations of prices and support intensity is presented. • Different design parameters are suggested by economic and technical quality indices. - Abstract: The paper presents results of design parameters optimisation of a wood chips fired steam boiler based heat and power block in a sample project of coal fired municipal heating plant modernisation. The project assumes the conversion of the heating plant into a dual fuel heat and power plant. The problem that is presented is selection of cogeneration block structure and thermodynamic parameters taking into account financial support mechanisms for cogeneration and renewable energy technologies. There are examined energy conversion and financial performances of the project. The results show that without the financial support the project is not profitable although it generates savings of primary energy of fossil fuels. If an administrative incentives are applied the optimal technical solution is different than suggested by energy conversion efficiency or fossil fuel savings. Financial calculations were performed for Polish marked conditions in the years 2011 and 2014 showing the impact of relatively short term variations of prices and support intensity on optimal plant design parameters

  5. Coal in Canada

    International Nuclear Information System (INIS)

    Salaff, S.

    1991-01-01

    This article examines the potential market for coal-fired independent power projects in western Canada. The topics of the article include emissions issues, export potential for power produced, and financial and other assistance to independent power producers offered by British Columbia Hydro and coal mining companies in the region, including financing of projects and power distribution services including connecting to the USA grids

  6. Report on the coal energy achievements in the Sunshine Project in fiscal 1988; 1989 nendo sunshine keikaku seika hokokusho. Sekitan energy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This paper describes the achievements in the Sunshine Project in fiscal 1988 in studies on coal liquefaction. The liquefaction mechanisms may be conceived to work in the following three manners: radicals produced by spontaneous bond and cleavage of coal molecules draw out hydrogen from the donor and stabilize it; bond, cleavage and stabilization due to hydrogenation from the donor to coal aromatic nucleus; and cleavage and stabilization due to work of active hydrogen discharged from the donor. How these mechanisms contribute to composition of the products depends on coals, liquefying conditions, and reactivity of the donor. Selection of the donor solvent requires design by which high liquefaction yield can be obtained with small amount of solvent. The oil plus asphaltene yield could have been approached to the ideal value through the moving liquefaction of gaseous phase hydrogen and catalyst-free hydrogen, with the 4HFL to coal ratio at 1.5 to 1. The gaseous phase hydrogen was found effective in reducing 4HFL. Liquefaction residual oil manufactured from Morwell brown coal subjected to BCL was hydrogenated in single stage or two stages to compare and discuss the solvent sorting constituents, reactivity of CLVR, and how the catalytic activity deteriorates. The cause for the catalyst deterioration was elucidated, and considerations were given on catalysts and reaction conditions for lightening and refining of CLVR. (NEDO)

  7. Leaching Behavior of Coal Combustion Products and the Environmental Implication in Road Construction : Project Progress Report

    Science.gov (United States)

    2009-01-26

    This is the third annual report for Project #043352. Project #043352 is designed to establish the leaching characteristics for several different types of ash using a relatively rigorous leaching procedure developed by Kosson et al (2002) for a wide r...

  8. Coal-to-liquid

    Energy Technology Data Exchange (ETDEWEB)

    Cox, A.W.

    2006-03-15

    With crude oil prices rocketing, many of the oil poor, but coal rich countries are looking at coal-to-liquid as an alternative fuel stock. The article outlines the two main types of coal liquefaction technology: direct coal liquefaction and indirect coal liquefaction. The latter may form part of a co-production (or 'poly-generation') project, being developed in conjunction with IGCC generation projects, plus the production of other chemical feedstocks and hydrogen. The main part of the article, based on a 'survey by Energy Intelligence and Marketing Research' reviews coal-to-liquids projects in progress in the following countries: Australia, China, India, New Zealand, the Philippines, Qatar and the US. 2 photos.

  9. Research report of FY 1997 on the environmentally acceptable coal utilization system feasibility survey. Clean coal technology model project seminar held in Thailand; 1997 nendo seika hokokusho. Kankyo chowagata sekitan riyo system kanosei chosa (Tai ni okeru clean coal technology model jigyo seminar no kaisai)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    To reduce SOx with coal utilization, the desulfurization seminar diffusing the demonstration project of simplified desulfurizer introduction was held at the site in Thailand. The purpose is to reduce the environmental pollutants and contribute to the effective utilization of energy with coal utilization in Thailand. Invitation letters were sent to users of coal and heavy oil boilers through the Department of Factories, Ministry of Industry, Thailand, to call participation in the seminar. Inspection of the desulfurizer introduced in the factory of Thai Union Paper Public was included in the seminar for diffusing the project. The inspection site is in the demonstration project site of simplified desulfurizer introduction. There were a lot of participants from Thai users and from Japan. The seminar included the presentations from NEDO, JETRO, FTI, and MOSTE, introduction of general technology for processes of ENAA desulfurizer, introduction of demonstration unit plan by IHI, and introduction of operation of demonstration unit by TUP. 31 figs., 6 tabs.

  10. Fiscal 1998 overseas geological structure survey report on the engineer interchange project (coal mine technology field), Indonesia; 1998 nendo kaigai chishitsu kozo nado chosa gijutsusha koryu jigyo (tanko gijutsu bun'ya), Indonesia hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    This project aims at improvement of coal mining technology and productivity in Indonesia by Japanese production control technology and business management technology for underground coal mining, through interchange of coal engineers between Japan and Indonesia. This project is composed of the short- term and long-term dispatch project of engineers to Indonesia, and the training project of Indonesian engineers in Japan. In fiscal 1998, the short-term dispatch was made for the training in Indonesia on underground coal mine development (development planning, pit mouth selection, main gallery design, mining system selection, transport planning, ventilation planning, under-river mining, mine water proofing, drainage). The long-term dispatch was made for contact and negotiation with concerned Indonesian organizations, support of the training project, and collection of information on the trend of Indonesian economy and energy, and the present and trend of the coal industry for conducting smooth and effective engineer interchange. (NEDO)

  11. EROI Analysis for Direct Coal Liquefaction without and with CCS: The Case of the Shenhua DCL Project in China

    Directory of Open Access Journals (Sweden)

    Zhaoyang Kong

    2015-01-01

    Full Text Available Currently, there are considerable discrepancies between China’s central government and some local governments in attitudes towards coal to liquids (CTL technology. Energy return on investment (EROI analysis of CTL could provide new insights that may help solve this dilemma. Unfortunately, there has been little research on this topic; this paper therefore analyses the EROI of China’s Shenhua Group Direct Coal Liquefaction (DCL project, currently the only DCL commercial project in the world. The inclusion or omission of internal energy and by-products is controversial. The results show that the EROIstnd without by-product and with internal energy is 0.68–0.81; the EROIstnd (the standard EROI without by-product and without internal energy is 3.70–5.53; the EROIstnd with by-product and with internal energy is 0.76–0.90; the EROIstnd with by-product and without internal energy is 4.13–6.14. Furthermore, it is necessary to consider carbon capture and storage (CCS as a means to control the CO2 emissions. Considering the added energy inputs of CCS at the plant level, the EROIs decrease to 0.65–0.77, 2.87–3.97, 0.72–0.85, and 3.20–4.40, respectively. The extremely low, even negative, net energy, which may be due to high investments in infrastructure and low conversion efficiency, suggests CTL is not a good choice to replace conventional energy sources, and thus, Chinese government should be prudent when developing it.

  12. Coal geopolitics

    International Nuclear Information System (INIS)

    Giraud, P.N.; Suissa, A.; Coiffard, J.; Cretin, D.

    1991-01-01

    This book divided into seven chapters, describes coal economic cycle. Chapter one: coals definition; the principle characteristics and properties (origin, calorific power, international classification...) Chapter two: the international coal cycle: coal mining, exploration, coal reserves estimation, coal handling coal industry and environmental impacts. Chapter three: the world coal reserves. Chapter four: the consumptions, productions and trade. Chapter five: the international coal market (exporting mining companies; importing companies; distributors and spot market operators) chapter six: the international coal trade chapter seven: the coal price formation. 234 refs.; 94 figs. and tabs [fr

  13. FEBEX II Project Post-mortem analysis EDZ assessment

    International Nuclear Information System (INIS)

    Bazargan Sabet, B.; Shao, H.; Autio, J.; Elorza, F. J.

    2004-01-01

    Within the framework of the FEBEX II project a multidisciplinary team studied the mechanisms of creation of the potential damaged zone around the test drift. The research program includes laboratory and in situ investigations as well as the numerical modelling of the observed phenomena. Where laboratory investigations are concerned, the 14C-PMMA technique was applied to study the spatial distribution of porosity in the samples taken from the test drift wall. In addition complementary microscopy and scanning electron microscopy (SEM) studies were performed to make qualitative investigations on the pore apertures and minerals in porous regions. The results obtained with the PMMA method have not shown any clear increased porosity zone adjacent to the tunnel wall. The total porosity of the samples varied between 0.6-1.2%. The samples of unplugged region did not differ from the samples of plugged region. A clear increase in porosity to depths of 10-15 mm from the tunnel wall was detected in lamprophyre samples. According to the SEM/EDX analyses the excavation-disturbed zone in the granite matrix extended to depths of 1-3 mm from the wall surface. A few quartz grains were crushed and some micro fractures were found. Gas permeability tests were carried out on two hollow cylinder samples of about 1m long each taken on the granite wall perpendicular to the drift axis. The first sample was cored in the service area far from the heated zone and the second one at the level of the heater. The tests were performed at constant gas pressure by setting a steady state radial flow through a section of 1cm wide isolated by means of four mini-packers. The profile of the gas permeability according to the core length has been established. The results obtained for both considered samples have shown permeability ranging between 3.5 10-18 and 8.4 10-19m2, pointing out the absence of a marked damage. Acoustic investigations have been carried out with the objective of quantifying the

  14. FEBEX II Project Post-mortem analysis EDZ assessment

    Energy Technology Data Exchange (ETDEWEB)

    Bazargan Sabet, B.; Shao, H.; Autio, J.; Elorza, F. J.

    2004-07-01

    Within the framework of the FEBEX II project a multidisciplinary team studied the mechanisms of creation of the potential damaged zone around the test drift. The research program includes laboratory and in situ investigations as well as the numerical modelling of the observed phenomena. Where laboratory investigations are concerned, the 14C-PMMA technique was applied to study the spatial distribution of porosity in the samples taken from the test drift wall. In addition complementary microscopy and scanning electron microscopy (SEM) studies were performed to make qualitative investigations on the pore apertures and minerals in porous regions. The results obtained with the PMMA method have not shown any clear increased porosity zone adjacent to the tunnel wall. The total porosity of the samples varied between 0.6-1.2%. The samples of unplugged region did not differ from the samples of plugged region. A clear increase in porosity to depths of 10-15 mm from the tunnel wall was detected in lamprophyre samples. According to the SEM/EDX analyses the excavation-disturbed zone in the granite matrix extended to depths of 1-3 mm from the wall surface. A few quartz grains were crushed and some micro fractures were found. Gas permeability tests were carried out on two hollow cylinder samples of about 1m long each taken on the granite wall perpendicular to the drift axis. The first sample was cored in the service area far from the heated zone and the second one at the level of the heater. The tests were performed at constant gas pressure by setting a steady state radial flow through a section of 1cm wide isolated by means of four mini-packers. The profile of the gas permeability according to the core length has been established. The results obtained for both considered samples have shown permeability ranging between 3.5 10-18 and 8.4 10-19m2, pointing out the absence of a marked damage. Acoustic investigations have been carried out with the objective of quantifying the

  15. A Manhattan Project in Educational Technology, Part II.

    Science.gov (United States)

    Roberts, Wesley K.

    The initial four phases of the Training Extension Course (TEC), a project to remedy deficiencies in training programs for armed forces recruits, employed systematic instructional development and extensive audiovisual resources. The project required subcontracting for lesson production and modifications in personnel and budgeting. Posttest evidence…

  16. Comprehensive report to Congress, Clean Coal Technology program: Pinon Pine IGCC Power Project

    International Nuclear Information System (INIS)

    1992-06-01

    The objective of the proposed project is to demonstrate an advanced IGCC system based upon the air-blown, fluidized-bed KRW gasifier with in-bed desulfurization using limestone sorbent and an external fixed- bed zinc ferrite sulfur removal system. Sierra Pacific Power Company (SPPC) requested financial assistance from DOE for the design, construction, and operation of a nominal 800 ton-per-day (86-Megawatt gross), air blown integrated gasification combined-cycle (IGCC) demonstration plant. The project, named the Pinon Pine IGCC Power Project, is to be located at SPPC's Tracy Station, a power generation facility located on a rural 400-acre plot about 17 miles east of Reno. The demonstration plant will produce electrical power for the utility grid. The project, including the demonstration phase, will last 96 months at a total cost of $269,993,100. DOE's share of the project cost will be 50 percent, or $134,996,550

  17. Coal development potential in Pakistan

    Energy Technology Data Exchange (ETDEWEB)

    Khan, M N; Pelofsky, A H [eds.

    1986-01-01

    A total of 48 papers were presented, and covered the following topics: the current situation in Pakistan with respect to development and utilization of coal resources; the policies that have been responsible for the development and utilization of coal resources in Pakistan; coal development and utilization in other developing nations e.g. Indonesia, Greece, Philippines, China, Thailand and Haiti; and technological developments in coal exploration; extraction, handling, transport and utilization which could accelerate future development of Pakistan's coal resources. Specific subjects covered include the use of coal in the cement industry of Pakistan; the production of briquettes for domestic use, development and training of personnel for the coal industry; and sources of finance for coal development projects. Particular emphasis is given throughout the conference to the Lakhra coal mine/power plant project which aims to develop and effectively utilize the lignite reserves of Sind Province. 47 papers have been abstracted separately.

  18. Wind River Watershed Project; 1998 Annual Report; Volume II

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    1999-01-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds

  19. 139 the impact of the national fadama ii development project

    African Journals Online (AJOL)

    OLUWOLE AKINNAGBE

    Key words: Impact, National Fadama II Facility, Poverty Alleviation, Agricultural ... production but enhance the income of the ... of employment has the higher incidence of ... This widening gap between ... each group (i.e. those earning ... Source: Field Survey data, 2007 .... increased as evidence has shown that the level.

  20. Clean coal initiatives in Indiana

    Science.gov (United States)

    Bowen, B.H.; Irwin, M.W.; Sparrow, F.T.; Mastalerz, Maria; Yu, Z.; Kramer, R.A.

    2007-01-01

    Purpose - Indiana is listed among the top ten coal states in the USA and annually mines about 35 million short tons (million tons) of coal from the vast reserves of the US Midwest Illinois Coal Basin. The implementation and commercialization of clean coal technologies is important to the economy of the state and has a significant role in the state's energy plan for increasing the use of the state's natural resources. Coal is a substantial Indiana energy resource and also has stable and relatively low costs, compared with the increasing costs of other major fuels. This indigenous energy source enables the promotion of energy independence. The purpose of this paper is to outline the significance of clean coal projects for achieving this objective. Design/methodology/approach - The paper outlines the clean coal initiatives being taken in Indiana and the research carried out at the Indiana Center for Coal Technology Research. Findings - Clean coal power generation and coal for transportation fuels (coal-to-liquids - CTL) are two major topics being investigated in Indiana. Coking coal, data compilation of the bituminous coal qualities within the Indiana coal beds, reducing dependence on coal imports, and provision of an emissions free environment are important topics to state legislators. Originality/value - Lessons learnt from these projects will be of value to other states and countries.

  1. Microbial reactions in coal and coal relevant structures. Part project: fungal and enzymatic depolarisation of brown coal for the production of low-molecular compounds. Interim report; Mikrobielle Umsetzung an Kohle und kohlenrelevanten Strukturen. Teilvorhaben: Pilzliche und enzymatische Depolymerisation von Braunkohle zur Gewinnung niedermolekularer Verbindungen. Zwischenbericht (Berichtszeitraum 01.01.1998 - 31.12.1998)

    Energy Technology Data Exchange (ETDEWEB)

    Ziegenhagen, D.; Bublitz, F.; Sorge, S.; Ullrich, R.; Hofrichter, M.; Fritsche, W.

    1999-04-29

    The present research project involved a study of the depolymerisation of brown coal constituents. The purpose of the depolymerisation experiments, which were carried out with fungi as well as their (acellular) enzymes, was to obtain products with a potential market value. Research focussed on one of the key enzymes of lignocellulose degradation, namely manganese (II) peroxidase (MnP). The effects of this enzyme on the depolymerisation of brown coal was studied in detail in acellular systems. The insights gained in this way then served as a basis for optimising the fungal and enzymatic depolymerisation processes for maximum yields of low-molecular products. The experiments carried out during the period under review were oriented to finding new types of lignolytically active organisms, isolating lignolytic enzymes and immobilising them on natural support materials, and further examining the action spectrum of MnP. Different model substrates were used in order to gain information on what bond types are MnP-cleavable and on possible reaction products. Substrates were either fixed to silica gel as support material or used without support material. The idea of using substrates fixed to support materials was motivated by the need to distinguish between intracellular and extracellular reactions involving the fungal mycelium. [Deutsch] Im Rahmen des Forschungsvorhabens wird die Depolymerisation von Braunkohle-Bestandteilen untersucht. Ziel der sowohl mit Pilzorganismen als auch mit deren Enzymen (zellfrei) durchgefuehrten Depolymerisationsversuche ist die Gewinnung von Produkten mit potentiellem Werkstoffcharakter. Im Mittelpunkt der Forschung steht eines der Schluesselenzyme des Ligninozellulose-Abbaus: Die Mangan(II)-Peroxidase (MnP). Die Wirkung dieses Enzyms bei der Depolymerisation von Braunkohle (Bk) in zellfreien Systemen wird weitergehend untersucht. Auf Grundlage der gewonnenen Erkenntnisse werden die pilzlichen und enzymatischen Depolymerisationsprozesse so

  2. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  3. Final report on the maintenance asset management project : phase II.

    Science.gov (United States)

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  4. Reports on 1976 result of Sunshine Project. Investigation on development policy and position of various coal liquefaction processes in Japan; 1976 nendo Nippon ni okeru kakushu sekitan ekika process no kaihatsu hoshin to ichizuke ni kansuru chosa seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-03-01

    This report is the summary of the 'investigation results concerning development policy and position of various coal liquefaction processes in Japan'. The purpose of this investigative research is primarily to clarify the position of coal energy in the future energy supply, technologies of converting coal to clean fuel as the form of coal energy utilization most suitable for Japan, and the position of coal liquefaction in such converting technologies, and also to decide on the policy of R and D on coal liquefaction process in Japan at present. Accordingly, this paper investigates the status quo of various liquefaction processes including the coal liquefaction technologies for which R and D are conducted under the Sunshine Project; making analysis/assessment from such viewpoint as clean process as environmental safeguard and a precondition for coal energy utilization, technical problems concerning coal import and transportation, and suitability for the present energy consumption structure centering on oil; and further, examining the position of coal liquefaction in the general effective utilization of coal as organic carbonaceous resources in the distant future. (NEDO)

  5. Coal Mines, Reclamation Sites - Mine Drainage Treatment/Land Recycling Project Locations

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Mine Drainage Treatment/Land Reclamation Locations are clean-up projects that are working to eliminate some form of abandoned mine. The following sub-facility types...

  6. Clean Coal Technology III: 10 MW Demonstration of Gas Suspension Absorption final project performance and economics report

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, F.E.

    1995-08-01

    The 10 MW Demonstration of the Gas Suspension Absorption (GSA) program is a government and industry co-funded technology development. The objective of the project is to demonstrate the performance of the GSA system in treating a 10 MW slipstream of flue gas resulting from the combustion of a high sulfur coal. This project involves design, fabrication, construction and testing of the GSA system. The Project Performance and Economics Report provides the nonproprietary information for the ``10 MW Demonstration of the Gas Suspension Absorption (GSA) Project`` installed at Tennessee Valley Authority`s (TVA) Shawnee Power Station, Center for Emissions Research (CER) at Paducah, Kentucky. The program demonstrated that the GSA flue-gas-desulfurization (FGD) technology is capable of achieving high SO{sub 2} removal efficiencies (greater than 90%), while maintaining particulate emissions below the New Source Performance Standards (NSPS), without any negative environmental impact (section 6). A 28-day test demonstrated the reliability and operability of the GSA system during continuous operation. The test results and detailed discussions of the test data can be obtained from TVA`s Final Report (Appendix A). The Air Toxics Report (Appendix B), prepared by Energy and Environmental Research Corporation (EERC) characterizes air toxic emissions of selected hazardous air pollutants (HAP) from the GSA process. The results of this testing show that the GSA system can substantially reduce the emission of these HAP. With its lower capital costs and maintenance costs (section 7), as compared to conventional semi-dry scrubbers, the GSA technology commands a high potential for further commercialization in the United States. For detailed information refer to The Economic Evaluation Report (Appendix C) prepared by Raytheon Engineers and Constructors.

  7. Coal engineer training project for fiscal 1999. Report on general course training; 1999 nendo sekitan gijutsusha yosei jigyo. Ippan course kenshu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-11-19

    This report was made on the general course training in the coal engineer training project implemented in fiscal 1999. The training was conducted from June 7 through November 19 with total 7 participating trainees from an electric power company, mining company, etc.. In the training, the lectures were given by speakers from domestic coal related companies, universities, laboratories and the like at the University of International Resources, a foundation, for about three weeks. An English training was carried out by three instructors at the same University for about eleven weeks with the purpose of acquiring the linguistic ability required for overseas coal development. The joint seminar was conducted in Tokyo by inviting lecturers, two from Australia and one each from Canada and Indonesia. The training by visiting the domestic coal related companies was such that the overseas lecturers and trainees visited Matsushima Mining Co., the Electric Power Development Company, NKK Corp and others. The overseas study and training were performed on a 35 day schedule by visiting energy-related institutions, mining companies, railway companies, coal loading/unloading harbors, and thermal power stations in Canada, the U.S., and Australia. (NEDO)

  8. Tanjung Enim IV coal exploration project. Volume I. Exploration work of South Arahan area in 2000/2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    In the 1996-2001 period, the project has been carried out in Banjarsari/Tanjung Enim areas and South Arahan area of South Sumatra. This report described the results of the project conducted in South Arahan area in 2000/2001. The area for survey is 40km{sup 2} in north block and 10km{sup 2} in south block, and the following were carried out: surface reconnaissance, geological mapping, drilling, geophysical logging, seismic survey (seismic reflection survey and VSP survey), and sampling for coal quality analysis. The number of boreholes drilled was 11 including 8 in north area and 3 in south area, and the total length was 1,847m. Physical logging was executed in all 11 boreholes, and VSP survey was done in one borehole per each block. As to the hydraulic test, water poring test was conducted at 3 boreholes in north block. In the report, the results of the survey were classified into the following 4 items: 1) outline of the survey; 2) field activities; 3) analysis of the results; 4) summarization. (NEDO)

  9. S-1 project. Volume II. Hardware. 1979 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This volume includes highlights of the design of the Mark IIA uniprocessor (SMI-2), and the SCALD II user's manual. SCALD (structured computer-aided logic design system) cuts the cost and time required to design logic by letting the logic designer express ideas as naturally as possible, and by eliminating as many errors as possible - through consistency checking, simulation, and timing verification - before the hardware is built. (GHT)

  10. Accelerator Physics Challenges for the NSLS-II Project

    Energy Technology Data Exchange (ETDEWEB)

    Krinsky,S.

    2009-05-04

    The NSLS-II is an ultra-bright synchrotron light source based upon a 3-GeV storage ring with a 30-cell (15 super-period) double-bend-achromat lattice with damping wigglers used to lower the emittance below 1 nm. In this paper, we discuss the accelerator physics challenges for the design including: optimization of dynamic aperture; estimation of Touschek lifetime; achievement of required orbit stability; and analysis of ring impedance and collective effects.

  11. The EMIL project at BESSY II: Beamline design and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hendel, Stefan, E-mail: stefan.hendel@helmholtz-berlin.de; Schäfers, Franz; Reichardt, Gerd; Scheer, Michael; Bahrdt, Johannes; Lips, Klaus [Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Albert-Einstein-Straße 15, 12489 Berlin (Germany); Hävecker, Michael [Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Albert-Einstein-Straße 15, 12489 Berlin (Germany); MPI for Chemical Energy Conversion, Stiftstrasse 34-36, 45470 Mülheim an der Ruhr (Germany)

    2016-07-27

    The Energy Materials In-Situ Laboratory Berlin (EMIL) at BESSY-II is currently under construction. Two canted undulators for soft- and hard X-rays will be installed into the BESSY II storage ring in one straight section, complex beamlines with more than twenty optical elements will be set up and a new laboratory building attached to BESSY II will host three endstations and a large UHV-transfer system connecting various HV- and UHV-deposition systems. The undulators, UE48 and U17, provide a broad energy spectrum of 80 - 10000 eV, of which the harder radiation (>700 eV) is provided by a cryogenic in-vacuum device. Three monochromators (two plane grating monochromators (PGM) and one LN{sub 2}-cooled double crystal monochromator (DCM)) disperse the radiation into separate pathways of 65 m length, while downstream of the monochromators split-mirror chambers distribute the photon beam to one (or simultaneously to two) of five upcoming endstations. Three of these endstations are designed for the full energy range with spatial overlap of the soft and hard foci, whereas one endstation (PEEM) uses only the soft and another one (PINK) only the hard branch, respectively.

  12. FY 1999 report on the survey of the overseas geological structure, etc. Japan-Indonesia joint Tanjung Enim coal exploration project; 1999 nendo kaigai chishitsu kozo nado chosa hokokusho. Nippon Indonesia sekitan kyodo tansa Tanjung Enim project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The paper summed up the FY 1999 results of the survey conducted based on the agreement on the Tanjung Enim IV coal exploration project which was concluded between NEDO and Indonesia's Ministry of Mining Energy. The survey was made for an area of approximately 40km{sup 2} which is a north block of the south Arahan region, Tanjung Enim, South Sumatra, Indonesia. To grasp the succession of strata/rock facies/geological structure and the state of existence of the coal seams to be drilled, surveys were conducted on ground surface and boreholes. A total of 10 holes was test-drilled, and all the boreholes were physically logged. As a result of the survey, each of A1, A2, B, C and E coal seams was confirmed as main seams. A1, A2 and B seams are low in ash and sulfur contents with heating values of approximately 4,800 kcal/kg, C seam is high in sulfur content, and E seam is high in heating value, 6,000 kcal/kg. As coal seams for open pit mining, existence of A, B and C seams is expected which lay in the shallow part from ground surface to sea level of 0m and in the range of depth of approximately 100m. The proved coal reserves of these coals were estimated at 189 million tons. (NEDO)

  13. FY 1980 Report on results of research and development project, commissioned by Sunshine Project. Analysis and evaluation of coal liquefied oil, and development of its applications; 1980 nendo sekitan ekikayu no bunseki hyoka to yoto kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the results of the first year of the 5-year survey/research project for analysis/evaluation of coal-liquefied oil, structural analysis and development of its applications. The program for analysis/evaluation of coal-liquefied oil includes surveys on the analytical methods for liquefied coal, which are compared with those for oil products, elementary analysis of the ashes in SRC, binder performance tests, and extraction of the problems to be solved for proposal of the analytical methods for coal-liquefied oil. The program for structural analysis includes that of coal-liquefied oil fractionated into middle distillate, fuel oil asphalt and pitches, configurations of a large-size liquefaction process, and characteristics of the oil produced thereby, and some examples of structural analysis are reported. The molecular species and compositions are determined for the middle distillate fraction.. The fuel oil shows average structures of diversified mixtures. The program for developing applications of coal-liquefied oil includes extraction of the problems anticipated when it is used as fuel, technical/economic evaluation of the upgrading techniques, and results and evaluation of conversion of the oil into stocks for chemicals. (NEDO)

  14. [To live well: health care or life project? Part II].

    Science.gov (United States)

    Viniegra Velázquez, Leonardo

    On the basis that life project as the driving force behind the life experience, the quest for human dignity is the way for true progress and the improvement of human condition. It's pointed out the need to be aware of the meaning of life understanding the motives behind our will to live that is the antecedent of life project. The proposed life project is a cognitive adventure, capable of transcending consumerism, individualism and passivity, toward the creation of a more inclusive world where the improvement spiritual, intellectual and moral can be viable. Said life project entails: a) A primary need: to link oneself with like-minded people that synergize against the prevailing order b) A core: The everlasting struggle for sublimated dignity c) A desideratum: The well-being of the majority d) An unavoidable purpose: The creation of a suitable world build on different ethical, political, lawful, cognitive and ecological foundations. In conclusion, this paper analyzes the influence of projects with an alternate proposal to the endeavors centered in healthcare that favor individualism, passivity and the current status quo. The best example of said alternate proposals is the commonly called "good death". Copyright © 2016 Hospital Infantil de México Federico Gómez. Publicado por Masson Doyma México S.A. All rights reserved.

  15. FY 1998 annual report on the survey on overseas geological structures. Project for exchanging engineers (coal mining technology area) (Vietnam); 1998 nendo kaigai chishitsu kozo nado chosaa. Gijutsusha koryu jigyo (tanko gijutsu bun'ya) (Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The project for exchanging engineers has been implemented, in order to improve production and managemental techniques of coal mining engineers in the Asia-Pacific region, promote smooth and efficient projects for surveying overseas geological structures, and facilitate stable supply of overseas coal to Japan. The FY 1998 project was concentrated on Vietnam, to which Japanese coal mining engineers were sent, and from which production management engineers were invited to Japan as trainees. The Japanese engineers sent to Vietnam educated the underground coal mining techniques. The Vietnamese management engineers invited were trained for, e.g., production management techniques (e.g., those for workplaces and organizations) in the Japanese mines, administrative management techniques, and techniques to improve safety and productivity in the mines. Coal Energy Center and Taiheiyo Mining's Kushiro Mine provided training facilities. (NEDO)

  16. SmartPark Technology Demonstration Project, Phase II: Final Report

    Science.gov (United States)

    2018-05-01

    The purpose of FMCSA's SmartPark project was to determine the feasibility of a technology for providing truck parking space availability information in real time to truckers on the road. SmartPark consisted of two phases. Phase I was a field operatio...

  17. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  18. SEL/Project Language. Level II, Kindergarten, Teacher's Handbook.

    Science.gov (United States)

    Valladares, Ann E.; Lynch, Helen C.

    The Teacher's Handbook is part of the publication series of the Southeastern Education Laboratory/Project Language (SEL/PL), an 8-year language-centered program designed to alleviate the language deficiencies of disadvantaged children between the ages of four and eleven. For teachers utilizing SEL/PL, the Handbook provides a research summary and…

  19. Projective limits of state spaces II. Quantum formalism

    Science.gov (United States)

    Lanéry, Suzanne; Thiemann, Thomas

    2017-06-01

    In this series of papers, we investigate the projective framework initiated by Kijowski (1977) and Okołów (2009, 2014, 2013), which describes the states of a quantum theory as projective families of density matrices. A short reading guide to the series can be found in Lanéry (2016). After discussing the formalism at the classical level in a first paper (Lanéry, 2017), the present second paper is devoted to the quantum theory. In particular, we inspect in detail how such quantum projective state spaces relate to inductive limit Hilbert spaces and to infinite tensor product constructions (Lanéry, 2016, subsection 3.1) [1]. Regarding the quantization of classical projective structures into quantum ones, we extend the results by Okołów (2013), that were set up in the context of linear configuration spaces, to configuration spaces given by simply-connected Lie groups, and to holomorphic quantization of complex phase spaces (Lanéry, 2016, subsection 2.2) [1].

  20. Savanna ecosystem project: phase I summary and phase II progress

    CSIR Research Space (South Africa)

    Huntely, BJ

    1978-07-01

    Full Text Available A summary of the results of the first phase (mid 1974 to mid 1976) of the South African Savanna Ecosystem Project being undertaken at Nylsvley in the northern Transvaal is presented. Phase I of this ten year study of the structure and functioning...

  1. EBR-II spent fuel treatment demonstration project

    International Nuclear Information System (INIS)

    Benedict, R.W.; Henslee, S.P.

    1997-01-01

    For approximately 10 years, Argonne National Laboratory was developed a fast reactor fuel cycle based on dry processing. When the US fast reactor program was canceled in 1994, the fuel processing technology, called the electrometallurgical technique, was adapted for treating unstable spent nuclear fuel for disposal. While this technique, which involves electrorefining fuel in a molten salt bath, is being developed for several different fuel categories, its initial application is for sodium-bonded metallic spent fuel. In June 1996, the Department of Energy (DOE) approved a radiation demonstration program in which 100 spent driver assemblies and 25 spent blanket assemblies from the Experimental Breeder Reactor-II (EBR-II) will be treated over a three-year period. This demonstrated will provide data that address issues in the National Research Council's evaluation of the technology. The planned operations will neutralize the reactive component (elemental sodium) in the fuel and produce a low enriched uranium product, a ceramic waste and a metal waste. The fission products and transuranium elements, which accumulate in the electrorefining salt, will be stabilized in the glass-bonded ceramic waste form. The stainless steel cladding hulls, noble metal fission products, and insoluble residues from the process will be stabilized in a stainless steel/zirconium alloy. Upon completion of a successful demonstration and additional environmental evaluation, the current plans are to process the remainder of the DOE sodium bonded fuel

  2. FY 1981 Report on the results of Sunshine Project. Research and development of techniques for liquefaction of coal (Development of extraction type liquefaction plant using brown coal-based solvent and researches on milling at high temperature in oil); 1981 nendo sekitan ekika gijutsu no kenkyu kaihatsu, kattankei yozai chushutsu ekika plant no kaihatsu seika hokokusho. Koon yuchu funsai no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-03-01

    This program is aimed at establishment of the techniques for milling of brown coal treated by primary dehydration and slurry adjustment, and secondary hydration plant, as part of the project for developing the techniques for liquefaction of brown coal. Brown coal (Australian Yallourn coal) treated by primary dehydration, solvents (creosote and decrystallized anthracene), and catalysts are used as the stock samples, to investigate the coal characteristics with respect to milling crushability, dehydration and liquefaction reactivity, and the slurries are prepared by changing coal charge rate, solvent and preparation temperature, to collect the data regarding, e.g., coal concentration, coal particle size, moisture level and liquefaction reactivity. It is found that milling crushability tends to decrease as coal charge rate or solvent/coal ratio increases whether creosote or decrystallized anthracene is used as the solvent. Milling crushability is unaffected by slurry preparation temperature. Content of residual moisture in the slurry decreases to 1% or less, when slurry preparation temperature is increased to 100 degrees C or higher. Liquefaction reactivity of the slurry shows slight dependence on slurry preparation temperature, when it is increased to 180 degrees C. (NEDO)

  3. Quantitative imaging studies with PET VI. Project II

    International Nuclear Information System (INIS)

    Copper, M.; Chen, C.T.; Yasillo, N.; Gatley, J.; Ortega, C.; DeJesus, O.; Friedman, A.

    1985-01-01

    This project is focused upon the development of hardware and software to improve PET image analysis and upon clinical applications of PET. In this report the laboratory's progress in various attenuation correction methods for brain imaging are described. The use of time-of-flight information for image reconstruction is evaluated. The location of dopamine D1 and D2 receptors in brain was found to be largely in the basal ganghia. 1 tab. (DT)

  4. Report on the research achievements in the Sunshine Project in fiscal 1992. Studies on improving the efficiency of coal gasification; 1992 nendo sekitan gas ka no kokoritsuka ni kansuru kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1992 in studies on improving the efficiency of coal gasification. Three kinds of coals were gasified under the atmosphere of hydrogen, He or CO2 by using the TPR method. The sulfur removing rate varies depending on coals even under the same reaction atmosphere, and so does the degree of influence of the atmospheric gases depending on coals. Very little effect of the atmospheric gases was found on the sulfur removing rate in Taiheiyo and Wandoan coals. While Tatung coal presents the same removing rate under the atmosphere of He and CO2, it shows 1.8 times greater removing rate under the hydrogen atmosphere. Generation patterns for H{sub 2}S and COS also vary depending on coal types and atmospheric gases. Inorganic sulfur shows the same behavior in the reaction process regardless of coal type and atmosphere, but organic sulfur behaves differently. The sulfur removing rate is determined by how easily the organic sulfur can be removed, which attributes to the difference in kinds and structures of organic sulfur compounds in the coal, together with the gas generation patterns. In order to discuss gasification of char, investigations were performed on effects of coal types and heat treatment temperatures, with regard to the gasification characteristics that can be estimated from the industrial and element analyses. (NEDO)

  5. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  6. Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground

    Science.gov (United States)

    Newman, Walter S.; Fairbridge, Rhodes W.

    This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sea-level regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of “Project NOAH”.

  7. Federal Government response to the September 12, 2000 environmental assessment report of the EUB-CEAA Joint Review Panel on the Cheviot Coal Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-04-01

    The Federal Court noted four deficiencies in the joint EUB-CEAA environmental review dated September 12, 2000 for the Cheviot Coal Project. The Joint Review Panel reconvened to hear additional evidence about these deficiencies. This memorandum to cabinet comprises the Government of Canada's response to the additional evidence. Some of the Panel's recommendations are accepted. Comments are included regarding migratory birds, protection of traditional aboriginal sites, economic benefits, grizzly bears, and fish habitat.

  8. Coal: the dinosaur wakes up

    International Nuclear Information System (INIS)

    Rousseau, Y.; Cosnard, D.

    2005-01-01

    In western countries, coal is considered as an industry of the past, but at the Earth's scale the situation is radically the opposite. Since three years, coal is the faster developing energy source, in particular thanks to China expansion and to the oil crisis which makes coal more competitive. This short paper presents the situation of coal mining in China: projects, working conditions and environmental impact. (J.S.)

  9. Coal surface control for advanced physical fine coal cleaning technologies

    Energy Technology Data Exchange (ETDEWEB)

    Morsi, B.I.; Chiang, S.H.; Sharkey, A.; Blachere, J.; Klinzing, G.; Araujo, G.; Cheng, Y.S.; Gray, R.; Streeter, R.; Bi, H.; Campbell, P.; Chiarlli, P.; Ciocco, M.; Hittle, L.; Kim, S.; Kim, Y.; Perez, L.; Venkatadri, R.

    1992-01-01

    This final report presents the research work carried out on the Coal Surface Control for Advanced Physical Fine Coal Cleaning Technologies project, sponsored by the US Department of Energy, Pittsburgh Energy Technology Center (DOE/PETC). The project was to support the engineering development of the selective agglomeration technology in order to reduce the sulfur content of US coals for controlling SO[sub 2] emissions (i.e., acid rain precursors). The overall effort was a part of the DOE/PETCs Acid Rain Control Initiative (ARCI). The overall objective of the project is to develop techniques for coal surface control prior to the advanced physical fine coal cleaning process of selective agglomeration in order to achieve 85% pyrite sulfur rejection at an energy recovery greater than 85% based on run-of-mine coal. The surface control is meant to encompass surface modification during grinding and laboratory beneficiation testing. The project includes the following tasks: Project planning; methods for analysis of samples; development of standard beneficiation test; grinding studies; modification of particle surface; and exploratory R D and support. The coal samples used in this project include three base coals, Upper Freeport - Indiana County, PA, Pittsburgh NO. 8 - Belmont County, OH, and Illinois No. 6 - Randolph County, IL, and three additional coals, Upper Freeport - Grant County- WV, Kentucky No. 9 Hopkins County, KY, and Wyodak - Campbell County, WY. A total of 149 drums of coal were received.

  10. Environmentally friendly type coal utilization technology transfer project. Downstream field; Kankyo chowagata sekitan riyo gijutsu iten jigyo. Karyu bun`ya

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The paper arranged the result of the clean coal technology transfer project carried out during October to December, 1996. For the purpose of supporting introduction/spread of clean coal technology (CCT) in Asian and Pacific countries, the project invited engineers of the countries to Japan, aiming at fermentation of the understanding of CCT and improvement in ability. The project was held by NEDO and managed by Center for Coal Utilization, Japan. The manager course is for policy decision makers, management and senior management (plant manager class). By taking up CCT assessment and a menu of economical efficiency, prepared was the environment to which CCT is introduced in case of working out policy and planning plant/equipment investment. Moreover, the engineer course is for policy planners, medium-class management (section chief class), senior engineers (planners), and takes up materials for judgment in case of planning CCT facilities and proposing measures to reduce environmental loads by management and improvement of facilities at the same time. Fifteen engineers were invited: 6 from China, 3 from Indonesia, 3 from the Philippines, and 3 from Thailand

  11. Measurement of batter movements in brown coal open cuts - results of a research project

    Energy Technology Data Exchange (ETDEWEB)

    Nehring, H

    1984-05-01

    In the course of a research project sponsored by the State of North Rhine-Westphalia the mine surveying methods used when measuring deformation on open cut batters were further developed, by taking into account the special conditions prevailing in open cuts, to such an extent that the essential monitoring of soil movements can be carried out reliably and promptly. As an integral part of an optimised, accurate geodetic measurement of points, the direct measurement of longitude across the open cut was introduced as a rapid measuring method. The aerophotogrammetric measurement of points is practically as accurate as terrestrial surveying. The author describes the prototype of an automatically operated instrument system for the monitoring of points. In conclusion he also stresses that the first promising advance has already been made as regards the sufficiently accurate monitoring of rock movements in boreholes.

  12. Coal competition: prospects for the 1980s

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    This report consists of 10 chapters which present an historical overview of coal and the part it has played as an energy source in the economic growth of the United States from prior to World War II through 1978. Chapter titles are: definition of coals, coal mining; types of coal mines; mining methods; mining work force; development of coal; mine ownership; production; consumption; prices; exports; and imports. (DMC)

  13. LIFAC Demonstration at Richmond Power and Light Whitewater Valley Unit No. 2 Volume II: Project Performance and Economics

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1998-04-01

    The C1ean Coal Technology (CCT) Program has been recognized in the National Energy Strategy as a major initiative whereby coal will be able to reach its full potential as a source of energy for the nation and the international marketplace. Attainment of this goal depends upon the development of highly efficient, environmentally sound, competitive coal utilization technologies responsive to diverse energy markets and varied consumer needs. The CCT Program is an effort jointly funded by government and industry whereby the most promising of the advanced coal-based technologies are being moved into the marketplace through demonstration. The CCT Program is being implemented through a total of five competitive solicitations. LIFAC North America, a joint venture partnership of ICF Kaiser Engineers, Inc., and Tampella Power Corporation, is currently demonstrating the LIFAC flue gas desulfurization technology developed by Tampella Power. This technology provides sulfur dioxide emission control for power plants, especially existing facilities with tight space limitations. Sulfur dioxide emissions are expected to be reduced by up to 85% by using limestone as a sorbent. The LIFAC technology is being demonstrated at Whitewater Valley Unit No. 2, a 60-MW coal-fired power plant owned and operated by Richmond Power and Light (RP&L) and located in Richmond, Indiana. The Whitewater plant consumes high-sulfur coals, with sulfur contents ranging from 2.0-2.9 $ZO. The project, co-funded by LIFAC North America and DOE, is being conducted with the participation of Richmond Power and Light, the State of Indiana, the Electric Power Research Institute (EPRI), and the Black Beauty Coal Company. The project has a total cost of $21.4 million and a duration of 48 months from the preliminary design phase through the testing program.

  14. Studsvik SUPER-RAMP-II: 9x9 Project

    International Nuclear Information System (INIS)

    Djurle, S.

    1991-12-01

    EPRI participated in an international program involving ramp-testing of 9 x 9 fuel rod segments in a test reactor in Sweden. The principal objective was to establish the pellet-cladding interaction (PCI) failure threshold for this type of fuel. Several segmented fuel rods were irradiated in Dresden-2 BWR with time-averaged linear heat ratings ranging from 13 to 17 kW/m up to average burnup ranging from 26 to 34 MWd/kgU. The segments were subsequently subjected to ramp-testing in the R2 reactor at Studsvik Nuclear. The ramp-testing consisted of an initial irradiation of peak linear heat rating between 12 to 16 kW/m for about two hours, followed by a rapid increase to a power level in the range of 36 to 50 kW/m. The upper power level was maintained for twelve hours or until the fuel failure was detected. The study concluded that for 9 x 9 fuel type the PCI failure threshold is ∼38 kW/m, independent of the burnup in the range of 26 to 34 MWd/kgU. This failure threshold is about 5 kW/m greater than that of traditional 8 x 8 design. Although the significance of this difference can be argued, the interim and final fuel examinations performed in this project by destructive and nondestructive methods revealed valuable detailed information on fuel performance, which is also documented and discussed in this report

  15. Report on the achievements in the Sunshine Project in fiscal 1991 on research and development of coal energy. Studies on coal liquefying catalysts and a method for analyzing liquefied oil; 1991 nendo sekitan ekikayo shokubai oyobi ekikayu bunseikiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1991 on research of coal liquefying catalysts and a method for analyzing liquefied oil. Alkalis and alkali earth metals present during coal liquefied oil hydrogenation treatment deteriorate the activity remarkably as an effect of metal deposition from an Mo-based catalyst on the activity deterioration. Discussions were given on hydrogenating decomposition paths for bi-cyclic compounds by using reaction of model substances. Preliminary discussions were given jointly under the Japanese and Canadian technical cooperation on enhancing the quality of co-treated oil in the coal liquefaction, and on catalysts used therein. A 1-t/d PSU circulating solvent was studied to support the NEDO's bituminous coal liquefaction program. Analyses were carried out on acenaphthenes, biphenyls, phenanthrenes, and anthracenes in the oil liquefied from Wandoan coal. Discussions were given on CoMo/Al{sub 2}O{sub 3} on the effects of catalyst concentrations and particle sizes in the coal liquefying reaction. In order to elucidate different non-covalently bonded high-order structures of coal polymer assemblies, chemical treatment was applied to coals under a relatively mild condition (room temperature to 150 degrees C). Chemical structures as a result of the non-covalent bond in the coals were investigated from change due to the treatment in the pyridine extraction characteristics. (NEDO)

  16. Report on the achievements in the Sunshine Project in fiscal 1991 on research and development of coal energy. Studies on coal liquefying catalysts and a method for analyzing liquefied oil; 1991 nendo sekitan ekikayo shokubai oyobi ekikayu bunseikiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1991 on research of coal liquefying catalysts and a method for analyzing liquefied oil. Alkalis and alkali earth metals present during coal liquefied oil hydrogenation treatment deteriorate the activity remarkably as an effect of metal deposition from an Mo-based catalyst on the activity deterioration. Discussions were given on hydrogenating decomposition paths for bi-cyclic compounds by using reaction of model substances. Preliminary discussions were given jointly under the Japanese and Canadian technical cooperation on enhancing the quality of co-treated oil in the coal liquefaction, and on catalysts used therein. A 1-t/d PSU circulating solvent was studied to support the NEDO's bituminous coal liquefaction program. Analyses were carried out on acenaphthenes, biphenyls, phenanthrenes, and anthracenes in the oil liquefied from Wandoan coal. Discussions were given on CoMo/Al{sub 2}O{sub 3} on the effects of catalyst concentrations and particle sizes in the coal liquefying reaction. In order to elucidate different non-covalently bonded high-order structures of coal polymer assemblies, chemical treatment was applied to coals under a relatively mild condition (room temperature to 150 degrees C). Chemical structures as a result of the non-covalent bond in the coals were investigated from change due to the treatment in the pyridine extraction characteristics. (NEDO)

  17. SEL/Project Language. Level II, Kindergarten, Volume II (Lessons 17-32).

    Science.gov (United States)

    Valladares, Ann E.; And Others

    This curriculum guide contains the Southeastern Education Laboratory/Project Language Lessons 17-32 stressing listening, speaking, and reading readiness for disadvantaged kindergarten children. The lessons are designed to be used in the SEL's mobile preschool units or as readiness materials for kindergarten. The major emphasis of this intervention…

  18. Title IV Quality Control Project, Stage II. Management Option II: Delivery System Quality Improvements.

    Science.gov (United States)

    Advanced Technology, Inc., Reston, VA.

    Stage Two of the Title IV Quality Control Project is an integrated study of quality in five related Federal financial aid programs for postsecondary students. Section 1 of the paper establishes a framework for defining quality improvements, in order to identify the types of changes that would tend to improve quality across all facets of the…

  19. Coal liquefaction becomes viable

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-11-15

    In 2003 the May/June issue of CoalTrans International speculated that coal liquefaction would become viable due to falling coal prices. This has not proved the case but the sustained high oil price is sparking new interest. A survey by Energy Intelligence and Marketing Research during November 2005 revealed a growth in the number of projects under development or at the feasibility stage. The article reports projects in China, the USA, Australia, New Zealand, the Philippines and India. China is commissioning the first wave of large liquefaction plants. The key question is whether other countries, particularly the USA, will follow.

  20. Field test corrosion experiments in Denmark with biomass fuels Part II Co-firing of straw and coal

    DEFF Research Database (Denmark)

    Montgomery, Melanie; Larsen, OH

    2002-01-01

    undertaken where coal has been co-fired with 10% straw and 20% straw (% energy basis) for up to approx. 3000 hours. Two types of exposure were undertaken to investigate corrosion: a) the exposure of metal rings on water/air cooled probes, and b) the exposure of a range of materials built into the existing...... and potassium sulphate. These components give rise to varying degrees of accelerated corrosion. This paper concerns co-firing of straw with coal to reduce the corrosion rate from straw to an acceptable level. A field investigation at Midtkraft Studstrup suspension-fired power plant in Denmark has been...... for 100% straw-firing. The corrosion products and course of corrosion for the various steel types were investigated using light optical and scanning electron microscopy. Catastrophic corrosion due to potassium chloride was not observed. Instead a more modest corrosion rate due to potassium sulphate rich...

  1. Update of progress for Phase II of B&W`s advanced coal-fired low-emission boiler system

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, D.K. [Babcock & Wilcox, Barberton, OH (United States); Madden, D.A.; Rodgers, L.W. [Babcock & Wilcox, Alliance, OH (United States)] [and others

    1995-11-01

    Over the past five years, advances in emission control techniques at reduced costs and auxiliary power requirements coupled with significant improvements in steam turbine and cycle design have significantly altered the governing criteria by which advanced technologies have been compared. With these advances, it is clear that pulverized coal technology will continue to be competitive in both cost and performance with other advanced technologies such as Integrated Gasification Combined Cycle (IGCC) or first generation Pressurized Fluidized Bed Combustion (PFBC) technologies for at least the next decade. In the early 1990`s it appeared that if IGCC and PFBC could achieve costs comparable to conventional pulverized coal plants, their significantly reduced NO{sub x} and SO{sub 2} emissions would make them more attractive. A comparison of current emission control capabilities shows that all three technologies can already achieve similarly low emissions levels.

  2. Technical data. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This volume includes a description of the railway to transport the coal; possible unbalance in the electrical power supply is considered in detail, as well as communications, signalling, etc. The railway will also be used to transport ashes and sludges for waste disposal. Coal fines in the coal supply will be burned to generate power. A very brief description of the coal gasification plant and its components is accompanied by a printout of the dates final engineering is to be completed. Permit applications are listed and socio-economic factors are discussed. The financing plan is discussed in some detail: basically, a loan guarantee from the Synthetic Fuels Corporation; equity provided by investment tax credit, deferred taxes, AFUDC and the sponsors; price support; and gas purchase agreement (this whole section includes several legal details.). (LTN)

  3. Pelletised fuel production from coal tailings and spent mushroom compost - Part II. Economic feasibility based on cost analysis

    International Nuclear Information System (INIS)

    Ryu, Changkook; Khor, Adela; Sharifi, Vida N.; Swithenbank, Jim

    2008-01-01

    Due to the growing market for sustainable energy, in order to increase the quality of the fuels, pellets are being produced from various materials such as wood and other biomass energy crops, and municipal waste. This paper presents the results from an economic feasibility study for pellet production using blends of two residue materials: coal tailings from coal cleaning and spent mushroom compost (SMC) from mushroom production. Key variables such as the mixture composition, raw material haulage and plant scale were considered and the production costs were compared to coal and biomass energy prices. For both wet materials, the moisture content was the critical parameter that influenced the fuel energy costs. The haulage distance of the raw materials was another factor that can pose a high risk. The results showed that the pellet production from the above two materials can be viable when a less energy-intensive drying process is utilised. Potential market outlets and ways to lower the costs are also discussed in this paper. (author)

  4. Projections of Demand for Waterborne Transportation, Ohio River Basin, 1980, 1990, 2000, 2020, 2040. Volume 3. Group I. Coal & Coke.

    Science.gov (United States)

    1980-12-01

    of Ohio. In 1976, it accounted for 77.1 𔄁| --. 1- percent of metal lurgi al d(oal consumpt in i ir tiv PSAs IIt heI mlo , comsumIng areas tI metal I...Model" "A Behavioral Description of the FOSSIL 1 Model" "Implemention of the EMF’s ’Coal in Transition’ Scenarios with the Gulf/SRI Model" Coal in

  5. TVA coal-gasification commercial demonstration plant project. Volume 5. Plant based on Koppers-Totzek gasifier. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    This volume presents a technical description of a coal gasification plant, based on Koppers-Totzek gasifiers, producing a medium Btu fuel gas product. Foster Wheeler carried out a conceptual design and cost estimate of a nominal 20,000 TPSD plant based on TVA design criteria and information supplied by Krupp-Koppers concerning the Koppers-Totzek coal gasification process. Technical description of the design is given in this volume.

  6. D4SCIENCE-II - Report on inter-projects coordination and collaboration

    OpenAIRE

    Castelli, Donatella; Zoppi, Franco

    2010-01-01

    This deliverable reports on the collaborations with other FP7 projects and R&D programmes established by D4Science-II from the beginning of the project until July 2010. The collaborations described are of different nature, as they range from purely technical exchanges involving mutual exploitation of technologies to the sharing of e- Infrastructure resources and to the joint organization of networking and dissemination events. The deliverable presents these collaborations clustered into: (i) ...

  7. NEDO coal resources exploitation subcommittee. 18th project report meeting; NEDO sekitan shigen kaihatsu bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    In a report on a 'survey for coal transportation system optimization in southern Sumatra' which is to contribute to the improvement of coal exploitation efficiency in the Musi river area in southern Sumatra, the coal transportation system from the coal mine to the harbor is reviewed, scenarios on funding and cost effectiveness and environmental impact are comprehensively examined, and suggestions are submitted for higher efficiency and cost effectiveness. In a report on a 'current utilization status and effectiveness of a non-destructive electromagnetic vibrator shock source,' an electromagnetic vibrator shock source out of several new coal exploration technologies which are combinations of test boring and seismic prospecting is taken up, and is compared, in terms of technical feature and cost effectiveness, with the seismic reflection survey technique that uses an explosive shock source, and then a conclusion is reported that an electromagnetic vibration shock source method is superior. Using the new electromagnetic method, a seismic wave frequency is so chosen as to be suitable for a given depth. Since it is non-destructive and emits less noise, it is expected that it will serve in various fields other than coal mining. (NEDO)

  8. FALSIRE Phase II. CSNI project for Fracture Analyses of Large-Scale International Reference Experiments (Phase II). Comparison report

    International Nuclear Information System (INIS)

    Sievers, J.; Schulz, H.; Bass, R.; Pugh, C.; Keeney, J.

    1996-11-01

    A summary of Phase II of the Project for Fracture Analysis of Large-Scale International Reference Experiments (FALSIRE) is presented. A FALSIRE II Workshop focused on analyses of reference fracture experiments. More than 30 participants representing 22 organizations from 12 countries took part in the workshop. Final results for 45 analyses of the reference experiments were received from the participating analysts. For each experiment, analysis results provided estimates of variables that include temperature, crack-mouth-opening displacement, stress, strain, and applied K and J values. The data were sent electronically to the Organizing Committee, who assembled the results into a comparative data base using a special-purpose computer program. A comparative assessment and discussion of the analysis results are presented in the report. Generally, structural responses of the test specimens were predicted with tolerable scatter bands. (orig./DG)

  9. Prioritizing sewer rehabilitation projects using AHP-PROMETHEE II ranking method.

    Science.gov (United States)

    Kessili, Abdelhak; Benmamar, Saadia

    2016-01-01

    The aim of this paper is to develop a methodology for the prioritization of sewer rehabilitation projects for Algiers (Algeria) sewer networks to support the National Sanitation Office in its challenge to make decisions on prioritization of sewer rehabilitation projects. The methodology applies multiple-criteria decision making. The study includes 47 projects (collectors) and 12 criteria to evaluate them. These criteria represent the different issues considered in the prioritization of the projects, which are structural, hydraulic, environmental, financial, social and technical. The analytic hierarchy process (AHP) is used to determine weights of the criteria and the Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE II) method is used to obtain the final ranking of the projects. The model was verified using the sewer data of Algiers. The results have shown that the method can be used for prioritizing sewer rehabilitation projects.

  10. Project inspection using mobile technology - phase II : assessing the impacts of mobile technology on project inspection.

    Science.gov (United States)

    2015-01-01

    As mobile technology becomes widely available and affordable, transportation agencies can use this : technology to streamline operations involved within project inspection. This research, conducted in two : phases, identified opportunities for proces...

  11. Coal Corporation of Victoria annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Information is presented on operations, strategic planning, brown coal production and finance. Divisional reports are presented for the following divisions of the Coal Corporation of Victoria: marketing, technical marketing and special projects, research and development, and corporate services. The activities of the technical marketing and special projects division are discussed under the following headings: the coal for industry programme, the Brown Coal Liquefaction (Victoria) Pty. Ltd. project, dried brown coal activities, and resource development planning and policy activities. The corporation is currently conducting research into the following areas: ion exchange materials, activated carbons, and horticultural and agricultural applications of brown coal.

  12. Fiscal 2000 survey report on project for promoting international cooperation. Survey on coal utilization in APEC region (Coal note); 2000 nendo kokusai kyoryoku suishin jigyo chosa hokokusho. APEC iki nai ni okeru sekitan riyo jokyo tou chosa (Koru note)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With the purpose of contributing to the infrastructure for promoting clean coal technology (CCT), there were compiled as the 'coal note' various kinds of coal-related information in China, Indonesia, Philippine, Thailand and Vietnam among APEC countries. Concerning China, for example, economic growth and energy supply/demand in the category of the energy outline were described in detail; as were the guiding principle. individual guidance plan, and specific energy policy of the 10th five year plan, in the category of the energy policy; coal deposits, geological summary, coal quality in each coal forming period, and the status quo of development, in the category of the coal mines and development; coal supply/demand, production, consumption, and export, in the category of the present status of the coal industry; producers, sales, quality of product coal, distribution, and price, in the category of the domestic supply; present state of environmental problems relating to coal, and environmental measures intended for coal, in the category of the coal-related environmental issues; and development, production, coal cleaning, quality control, safety control, and utilization (combustion, liquefaction and gasification), in the category of coal utilization technology, respectively. (NEDO)

  13. Review of the water management systems in the Gujarat Medium Irrigation II Project (Credit 1496-IN)

    NARCIS (Netherlands)

    Brouwer, R.

    1993-01-01

    Different activities are ongoing in the Medium Irrigation II project simultaneously. These are: - emancipation of farmers through their involvement in the operation and management; - change over from Sheshpali type water management to RWS type water management; - design and construction of remaining

  14. 76 FR 55947 - Industrial Relations Promotion Project, Phase II in Vietnam

    Science.gov (United States)

    2011-09-09

    ... DEPARTMENT OF LABOR Office of the Secretary Industrial Relations Promotion Project, Phase II in... to perform the type of activity to be funded.. DAI, through its Industrial Relations Promotion... provided a letter in support of continued funding of DAI/IRRP based, on part, on the importance of the...

  15. Solvent refined coal (SRC) process. Flashing of SRC-II slurry in the vacuum column on Process Development Unit P-99. Interim report, February-June 1980

    Energy Technology Data Exchange (ETDEWEB)

    Gray, J. A.; Mathias, S. T.

    1980-10-01

    This report presents the results of 73 tests on the vacuum flash system of Process Development Unit P-99 performed during processing of three different coals; the second batch, fourth shipment (low ash batch) of Powhatan No. 5 Mine (LR-27383), Powhatan No. 6 Mine (LR-27596) and Ireland Mine (LR-27987). The objective of this work was to obtain experimental data for use in confirming and improving the design of the vacuum distillation column for the 6000 ton/day SRC-II Demonstration Plant. The 900/sup 0/F distillate content of the bottoms and the percent of feed flashed overhead were correlated with flash zone operating conditions for each coal, and the observed differences in performance were attributed to differences in the feed compositions. Retrogressive reactions appeared to be occurring in the 900/sup 0/F+ pyridine soluble material leading to an increase in the quantity of pyridine insoluble organic matter. Stream physical properties determined include specific gravity, viscosity and melting point. Elemental, distillation and solvent analyses were used to calculate component material balances. The Technology and Materials Department has used these results in a separate study comparing experimental K-values and vapor/liquid split with CHAMP computer program design predictions.

  16. DECOVALEX II PROJECT. Technical report - Task 1A and 1B

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove; Kautsky, F.

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX I, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 1A and 1B - the predictions and model calibrations for the RCF 3 pumping test at Sellafield. Presented in this report are the descriptions of the project, tasks, approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and submitted to the project secretariat, and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  17. FY 2000 report on the survey of geological structures overseas, etc. Volume 2. 'Tanjung Enim IV Coal Exploration Project between Japan and Indonesia'; 2000 nendo kaigai chishitsu kozo chosa hokokusho. 2. Nippon Indonesia sekitan kyodo tansa Tanjung Enim project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The survey was finished in the final fiscal year (FY 2000) of the Tanjung Enim IV Coal Exploration Project between Japan and Indonesia, and a report was summarized on the preliminary coal mining plan. In the design of the optimum mining area and pit, in terms of 3 cases of coal price of $8, $10, and $12/ton, the pit design was made considering rivers, houses, power transmission lines, etc., and the actual coal yield was asked. In the case of coal price of $8/ton, the actual coal yield in pit was 315 million tons in north block and 171 million tons in south block. In the case of coal price of $10/ton, pits are expandable in north block, but not in south block. For all the pit shapes designed, long-term mining plans were worked out. In each of the cases of coal production amount of 1 million, 3 million and 5 million tons, indicated were secular changes in overburden amount and coal quality because of the difference in mining direction. Further studies were made on the deposition plan, simulation of models of mining heavy machines, coal mine facilities, economical efficiency of coal mines, etc. (NEDO)

  18. New coal

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    Specially dedicated to coal, this edition comprises a series of articles of general interest dealing with the position of the French coalmining industry (interview with M.P. Gardent), the coal market in France, the work of CERCHAR, etc. New techniques, in-situ gasification of deep coal, gasification of coal by nuclear methods, the conversion of coal into petrol, the Emile Huchet power plant of Houilleres du Bassin de Lorraine, etc., are dealt with.

  19. Coal upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, S. [IEA Clean Coal Centre, London (United Kingdom)

    2009-10-15

    This report examines current technologies and those likely to be used to produce cleaner coal and coal products, principally for use in power generation and metallurgical applications. Consideration is also given to coal production in the leading coal producing countries, both with developed and developing industries. A range of technologies are considered. These include the coal-based liquid fuel called coal water mixture (CWM) that may compete with diesel, the production of ultra-clean coal (UCC) and coal liquefaction which competes with oil and its products. Technologies for upgrading coal are considered, especially for low rank coals (LRC), since these have the potential to fill the gap generated by the increasing demand for coal that cannot be met by higher quality coals. Potential advantages and downsides of coal upgrading are outlined. Taking into account the environmental benefits of reduced pollution achieved through cleaner coal and reduced transport costs, as well as other positive aspects such as a predictable product leading to better boiler design, the advantages appear to be significant. The drying of low rank coals improves the energy productively released during combustion and may also be used as an adjunct or as part of other coal processing procedures. Coal washing technologies vary in different countries and the implications of this are outlined. Dry separation technologies, such as dry jigging and electrostatic separation, are also described. The demonstration of new technologies is key to their further development and demonstrations of various clean coal technologies are considered. A number of approaches to briquetting and pelletising are available and their use varies from country to country. Finally, developments in upgrading low rank coals are described in the leading coal producing countries. This is an area that is developing rapidly and in which there are significant corporate and state players. 81 refs., 32 figs., 3 tabs.

  20. The neutron utilization and promotion program of TRR-II research reactor project in Taiwan

    International Nuclear Information System (INIS)

    Gone, J.K.; Huang, Y.H.

    2001-01-01

    The objective of the Taiwan research reactor system improvement and utilization promotion project is to reconstruct the old Taiwan research reactor (TRR), which was operated by the Institute of Nuclear Energy Research (INER) between 1973 and 1988, into a multi-purpose medium flux research reactor (TRR-II). The project started in 1998, and the new reactor is scheduled to have its first critical in June of 2006. The estimated maximum unperturbed thermal neutron flux (E 14 n/cm 2 sec, and it is about one order of magnitude higher than other operating research reactors in Taiwan. The new reactor will equip with secondary neutron sources to provide neutrons with different energies, which will be an essential tool for advanced material researches in Taiwan. One of the major tasks of TRR-II project is to promote domestic utilization of neutrons generated at TRR-II. The traditional uses of neutrons in fuel/material research, trace element analysis, and isotope production has been carried out at INER for many years. On the other hand, it is obvious that promotions of neutron spectrometric technique will be a major challenge for the project team. The limited neutron flux from operating research reactors had discouraged domestic users in developing neutron spectrometric technique for many years, and only few researchers in Taiwan are experienced in using spectrometers. It is important for the project team to encourage domestic researchers to use neutron spectrometers provided by TRR-II as a tool for their future researches in various fields. This paper describes the current status of TRR-II neutron utilization and promotion program. The current status and future plans for important issues such as staff recruiting, personnel training, international collaboration, and promotion strategy will be described. (orig.)

  1. China's coal industry

    Energy Technology Data Exchange (ETDEWEB)

    Karmazin, V A

    1988-09-01

    Presents data on China's coal industry. China's coal reserves are estimated to be 4,000 million Mt; annual production is over 800 Mt. Eleven new mining projects have been recently completed. They were financed with participation of foreign capital (US$ 1,400 million). Twenty-five new mines with 32.27 Mt production capacity were planned to be put into operation in 1988. Annual coal production is expected to increase to 870 Mt in 1990 at a cost of US$ 8,500 million. Numerical data on China's individual coal basins, new schemes, capital outlay and foreign capital participation are given. The dynamic development of China's coal industry since 1949 is briefly reviewed and management methods are explained.

  2. THE OHIO RIVER VALLEY CO2 STORAGE PROJECT - PRELIMINARY ASSESSMENT OF DEEP SALINE RESERVOIRS AND COAL SEAMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Mudd; Howard Johnson; Charles Christopher; T.S. Ramakrishnan, Ph.D.

    2003-08-01

    This report describes the geologic setting for the Deep Saline Reservoirs and Coal Seams in the Ohio River Valley CO{sub 2} Storage Project area. The object of the current project is to site and design a CO{sub 2} injection facility. A location near New Haven, WV, has been selected for the project. To assess geologic storage reservoirs at the site, regional and site-specific geology were reviewed. Geologic reports, deep well logs, hydraulic tests, and geologic maps were reviewed for the area. Only one well within 25 miles of the site penetrates the deeper sedimentary rocks, so there is a large amount of uncertainty regarding the deep geology at the site. New Haven is located along the Ohio River on the border of West Virginia and Ohio. Topography in the area is flat in the river valley but rugged away from the Ohio River floodplain. The Ohio River Valley incises 50-100 ft into bedrock in the area. The area of interest lies within the Appalachian Plateau, on the western edge of the Appalachian Mountain chain. Within the Appalachian Basin, sedimentary rocks are 3,000 to 20,000 ft deep and slope toward the southeast. The rock formations consist of alternating layers of shale, limestone, dolomite, and sandstone overlying dense metamorphic continental shield rocks. The Rome Trough is the major structural feature in the area, and there may be some faults associated with the trough in the Ohio-West Virginia Hinge Zone. The area has a low earthquake hazard with few historical earthquakes. Target injection reservoirs include the basal sandstone/Lower Maryville and the Rose Run Sandstone. The basal sandstone is an informal name for sandstones that overlie metamorphic shield rock. Regional geology indicates that the unit is at a depth of approximately 9,100 ft below the surface at the project site and associated with the Maryville Formation. Overall thickness appears to be 50-100 ft. The Rose Run Sandstone is another potential reservoir. The unit is located approximately 1

  3. Fiscal 1994 survey of the base arrangement promotion for foreign coal import. Project to heighten the quality of subbituminous coal by low temperature carbonization process; 1994 nendo kaigaitan yunyu kiban seibi sokushin chosa. Teion kanryuho ni yoru arekiseitan no kohinshitsuka jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The low-temperature carbonization process of coal is a technology to produce high grade reformed coal corresponding to bituminous coal and coal oil corresponding to heavy oil from subbituminous coal and supply them at prices close to the present market ones. From viewpoints of diversified sources and multiple export harbors, an initial-stage survey was conducted of the whole flow from new development of undeveloped mining areas in the northwest of Sumatra, Indonesia to bringing by ships to Japan of products reformed by LFC process of the US SGI`s low-temperature carbonization technology. Clean coal prepared after mining is produceable at a little higher than $12. At processing ability of 10,000 tons/day of raw coal, production is expected of approximately 5,700 tons/day of solid products of more than 6,500 kcal/kg and approximately 1,000 tons/day of low sulfur C heavy oil class oil. The finished cost of solid products is about $25/ton, which becomes about $40/ton at the harbor price in Japan. In conclusion, the project to enhance the quality of subbituminous coal by the low-temperature carbonization is promising as a total system. 10 refs., 54 figs., 30 tabs.

  4. DECOVALEX II PROJECT. Technical report - Task 2A and 2B. (Revised edition)

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX 1, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 2A and 2B - the predictions and model calibration for the hydro-mechanical effect of the excavation of the test pit for the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan. Presented in this report are the descriptions of the project, definition of Task 2, and approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  5. Phase II Final Project Report SBIR Project: "A High Efficiency PV to Hydrogen Energy System"

    Energy Technology Data Exchange (ETDEWEB)

    Slade, A; Turner, J; Stone, K; McConnell, R

    2008-09-02

    The innovative research conducted for this project contributed greatly to the understanding of generating low-cost hydrogen from solar energy. The project’s research identified two highly leveraging and complementary pathways. The first pathway is to dramatically increase the efficiency of converting sunlight into electricity. Improving solar electric conversion efficiency directly increases hydrogen production. This project produced a world record efficiency for silicon solar cells and contributed to another world record efficiency for a solar concentrator module using multijunction solar cells. The project’s literature review identified a second pathway in which wasted heat from the solar concentration process augments the electrolysis process generating hydrogen. One way to do this is to use a “heat mirror” that reflects the heat-producing infrared and transmits the visible spectrum to the solar cells; this also increases solar cell conversion efficiency. An economic analysis of this concept confirms that, if long-term concentrator photovoltaic (CPV) and solid-oxide electrolyzer cost goals can be achieved, hydrogen will be produced from solar energy cheaper than the cost of gasoline. The potential public benefits from this project are significant. The project has identified a potential energy source for the nation’s future electricity and transportation needs that is entirely “home grown” and carbon free. As CPV enter the nation’s utility markets, the opportunity for this approach to be successful is greatly increased. Amonix strongly recommends further exploration of this project’s findings.

  6. Fiscal 1995 survey report on the environmentally friendly type coal utilization system introduction support project. Verification project on the circulating fluidized bed boiler; Kankyo chowagata sekitan riyo system donyu shien jigyo. Junkan ryudosho boiler ni kakawaru jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    In relation to the circulating fluidized bed boiler which reduces the amount of sulfur oxides emitted in coal utilization, a verification project was carried out on installation of the equipment and spread activity in China and the Philippines contributing to the control of environmental pollutant associated with coal utilization and the effective use of energy. At the Fanshan area, installed was a 10t/h internal circulating fluidized bed boiler. At the performance test, coal includes around 7% of impurities such as stone, and the impurities should be excluded continuously at the time of actual run. Therefore, the boiler efficiency had to be changed from 89.5% to 85.8%. Further, power generation facilities have not yet been finished, and the overall operation of boiler turbine has not been executed. At the Zibo area, a 30t/h external circulating fluidized bed boiler was installed. The boiler efficiency reached 86.1%, over the targeted value. At the Batangas area in the Philippines, a 10t/h internal circulating fluidized bed boiler was installed. The boiler efficiency reached 85.8%, over the designed value. About the coal produced in the Philippines, slagging was feared, but the combustion state was favorable. 82 figs., 21 tabs.

  7. Development of coal resources

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    It is an important issue to expand stable coal supply areas for Japan, especially to assure stable supply of overseas coals. The investigations on geological structures in foreign countries perform surveys on geological structures in overseas coal producing countries and basic feasibility studies. The investigations select areas with greater business risks in coal producing countries and among private business entities. The geological structure investigations were carried out on China, Indonesia and Malaysia and the basic feasibility studies on Indonesia during fiscal 1994. The basic coal resource development investigations refer to the results of previous physical explorations and drilling tests to develop practical exploration technologies for coal resources in foreign countries. The development feasibility studies on overseas coals conduct technological consultation, surface surveys, physical explorations, and trial drilling operations, and provide fund assistance to activities related thereto. Fiscal 1994 has provided fund assistance to two projects in Indonesia and America. Fund loans are provided on investigations for development and import of overseas coals and other related activities. Liability guarantee for development fund is also described.

  8. Coal-92

    International Nuclear Information System (INIS)

    Hillring, B.; Sparre, C.

    1992-11-01

    Swedish consumption of coal and coke during 1991 and trends in technology, environment and market aspects of coal use are reported. Steam coal use in the heating sector was unchanged from 1991, 1.2 Mtons. Reduced consumption in smaller district heating units (due to conversion to biofuels and gas) was compensated by increased use for power generation in cogeneration plants. Coal consumption in industry fell 0.10 Mton to 0.84 Mton due to lower production in one industry branch. Import of steam coal was 1.1 Mton (down 0.5 Mton from 1990) since new rules for strategic reserves allowed a reduction of stocks. During the last five years stocks have been reduced by 2 Mtons. Import of metallurgical coal was 1.6 Mton, unchanged from 1990. The report also gives statistics for the coal using plants in Sweden, on coal R and D, and on emission laws for coal firing. (9 tabs., 2 figs.)

  9. Coal conversion. 1977 technical report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    The status and progress in US DOE's projects in coal gasification, liquefaction, and fluidized-bed combustion are reviewed with financing, flowsheets, history, progress and status of each (57 projects). (LTN)

  10. Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Farris; Johanna Oxstrand; Gregory Weatherby

    2011-09-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive

  11. Advanced Instrumentation, Information and Control (II and C) Research and Development Facility Buildout and Project Execution of LWRS II and C Pilot Projects 1 and 3

    International Nuclear Information System (INIS)

    Farris, Ronald; Oxstrand, Johanna; Weatherby, Gregory

    2011-01-01

    The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II and C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II and C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results

  12. Fiscal 2000 feasibility research on environmentally friendly coal utilization system. Seminar holding project (China: Zaozhuang, Yanshan, Jianshan, Jinzhou); 2000 nendo kankyo chowagata sekitan riyo system kanosei chosa hokokusho. Seminar kaisai jigyo (Chugoku Zhaozhuang, Yanshan, Jianshan, Jinzhou)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Seminars were held in China for the delivery of reports on the results of model projects with a view to popularizing the results of the clean coal technology model projects, which had been completed, for the purpose of contributing to the improvement on coal utilization technology and to the enhancement of environmental protection. The seminars took place at the sites of demonstration model projects just completed in China, namely, Zhejiang Huba Corporation (low-grade coal combustion system); Chaili Colliery, Zaozhuang Coal Mining Administration (CFBC - circulating fluidized bed combustion); Jinzhou Heat Power General Co., Ltd. (CFBC); and Beijing Yanshan Petrochemical Corporation (desulfurizing agent-added coal-water mixture system). At each of the project implementation sites, lectures were given on technical matters, technical know-how was exchanged, and study tours were organized to facilities concerned, which meant to promote the diffusion of the related technologies throughout China and, eventually, to contribute to the enhancement of environmental protection. The main subjects at the seminars included the introduction of GAP (green aid plan) projects in China, introduction of the outlines of technologies related to the model projects, verification and achievements, latest trends, and measures for the diffusion of the technologies. Study tours were made, and videos were shown relating to the local conditions. Every one of the seminars was successfully attended by 60-70 participants. (NEDO)

  13. The new deal of coal

    International Nuclear Information System (INIS)

    Kalaydjian, F.; Cornot-Gandolphe, S.

    2008-01-01

    While coal appears as an inescapable resource to answer the energy needs of the 21. century, its highly CO 2 emitting combustion represents a major risk with respect to the requirements of the fight against climate change. In the first part of this book, the basic aspects of energy markets are explained and in particular the role that coal is going to play in the world's energy supplies. In the second part, the new coal usages are presented, which, combined with CO 2 capture and sequestration techniques, should allow to conciliate a massive use of coal and the respect of environmental constraints. This book is based on the works presented in February 2008 by the French institute of petroleum (IFP) about the new outlets of coal and the risks for climate change. Content: 1 - coal, energy of the 21. century: abundant and well distributed reserves; growing up world production; exponential world demand; international trade: still limited but in full expansion; 2 - Technologies for a CO 2 -free coal: CO 2 capture and sequestration technologies; towards poly-generation; production of coal-derived liquid fuels; 3 - Appendices: coals formation; coal in China: status and perspectives; coal in the USA: status and perspectives; coal in India: status and perspectives; COACH: an ambitious European project; CBM - E-CBM, status and perspectives. (J.S.)

  14. Industrial use of coal and clean coal technology

    Energy Technology Data Exchange (ETDEWEB)

    Leibson, I; Plante, J J.M.

    1990-06-01

    This report builds upon two reports published in 1988, namely {ital The use of Coal in the Industrial, Commercial, Residential and Transportation Sectors} and {ital Innovative Clean Coal Technology Deployment}, and provides more specific recommendations pertaining to coal use in the US industrial sector. The first chapter addresses industrial boilers which are common to many industrial users. The subsequent nine chapters cover the following: coke, iron and steel industries; aluminium and other metals; glass, brick, ceramic, and gypsum industries; cement and lime industries; pulp and paper industry; food and kindred products; durable goods industry; textile industry; refining and chemical industry. In addition, appendices supporting the contents of the study are provided. Each chapter covers the following topics as applicable: energy overview of the industry sector being discussed; basic processes; foreign experience; impediments to coal use; incentives that could make coal a fuel of choice; current and projected use of clean coal technology; identification of coal technology needs; conclusions; recommendations.

  15. FY 2000 report on the survey of geological structures overseas, etc. Volume 1. 'Tanjung Enim IV Coal Exploration Project between Japan and Indonesia'; 2000 nendo kaigai chishitsu kozo nado chosa hokokusho. 1. Nippon Indonesia sekitan kyodo tansa Tanjung Enim project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper summarized the results of the surveys in the final fiscal year (FY 2000) and in the past five years of the Tanjung Enim IV Coal Exploration Project between Japan and Indonesia. In FY 2000, conducted in the South Arahan area were the surface reconnaissance (50km+ACI-2), boring survey (11 holes, 1,847m), borehole physical logging (11 holes), reflection method seismic survey (3 traverse lines), pumping test, coal analysis (112 specimens), etc. As a result of the exploration/study made during 5 years, coal reserves in the South Arahan area were 223 million tons in north block (proved coal reserves: 213 million tons) and 332 million tons (proved coal reserves: 303 million tons) in south block. The coal in the area is in the depth of {+-}0m from surface, and the coal reserve is enough for large scale open pit mining. Further, coal reserves in the Banjarsari area were 442 million tons (proved coal reserves: 330 million tons) in the whole area and 223 million tons (proved coal reserves: 214 million tons) in the syncline part. About the syncline part promising as that for open pit mining, the overburden ratio was divided into three for calculation: 2:1, 3:1 and 4:1 or below. (NEDO)

  16. Projections of air toxic emissions from coal-fired utility combustion: Input for hazardous air pollutant regulators

    International Nuclear Information System (INIS)

    Szpunar, C.B.

    1993-01-01

    The US Environmental Protection Agency (EPA) is required by the 1990 CAAA to promulgate rules for all ''major'' sources of any of these HAPs. According to the HAPs section of the new Title III, any stationary source emitting 10 tons per year (TPY) of one HAP or 25 TPY of a combination of HAPs will be considered and designated a major source. In contrast to the original National Emission Standards for Hazardous Air Pollutants (NESHAP), which were designed to protect public health to ''an ample margin of safety,'' the new Title III, in its first phase, will regulate by industrial category those sources emitting HAPs in excess of the 10/25-TPY threshold levels, regardless of health risks. The trace elements normally associated with coal mineral matter and the various compounds formed during coal combustion have the potential to produce hazardous air toxic emissions from coal-fired electric utilities. Under Title III, the EPA is required to perform certain studies, prior to any regulation of electric utilities; these studies are currently underway. Also, the US Department of Energy (DOE) maintains a vested interest in addressing those energy policy questions affecting electric utility generation, coal mining, and steel producing critical to this country's economic well-being, where balancing the costs to the producers and users of energy with the benefits of environmental protection to the workers and the general populace remains of significant concern

  17. Coal 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    ACR's Coal 1992, the successor to the ACR Coal Marketing Manual, contains a comprehensive set of data on many aspects of the Australian coal industry for several years leading up to 1992. Tables and text give details of coal production and consumption in New South Wales, Queensland and other states. Statistics of the Australian export industry are complemented by those of South Africa, USA, New Zealand, Canada, Indonesia, China, Colombia, Poland and ex-USSR. Also listed are prices of Australian coking and non-coking coal, Australian coal stocks (and those of other major countries), loading port capacities, freight rates and coal quality requirements (analysis of coals by brand and supplier). A listing of Australian coal exporting companies is provided. A description of the spot Coal Screen Dealing System is given. World hard coal imports are listed by country and coal imports by major Asian countries tabulated. A forecast of demand by coal type and country up to the year 2000 is included.

  18. Decontamination and decommissioning project status of the TRIGA Mark II and III in Korea

    International Nuclear Information System (INIS)

    Paik, S.T.; Park, S.K.; Chung, K.W.; Chung, U.S.; Jung, K.J.

    1999-01-01

    TRIGA Mark-II, the first research reactor in Korea, has operated since 1962, and the second one, TRIGA Mark-III since 1972. Both of them had their operation phased out in 1995 due to their lives and operation of the new research reactor, HANARO (High-flux Advanced Neutron Application Reactor) at the Korea Atomic Energy Institute (KAERI) in Taejon. Decontamination and decommissioning (D and D) project of TRIGA Mark-II and Mark-III was started in January 1997 and will be completed in December 2002. The first year of the project, work was performed in preparation of the decommissioning plan, start of the environmental impact assessment and setup licensing procedure and documentation for the project with cooperation of Korea Institute of Nuclear Safety (KINS). Hyundai Engineering Company (HEC) is the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels plc (BNFL) is the technical assisting partner of HEC. The decommissioning plan document was submitted to the Ministry of Since and Technology (MOST) for the decommissioning license in December 1998, and it expecting to be issued a license in mid 1999. The goal of this project is to release the reactor site and buildings as an unrestricted area. This paper summarizes current status and future plan for the D and D project. (author)

  19. HIFS VNL Monthly Progress Report Preparation for NDCX-II Project

    International Nuclear Information System (INIS)

    Logan, Grant; Kwan, Joe; Barnard, John; Friedman, Alex; Gilson, Erik; Leitner, Matthaeus; Waldron, Will; Bieniosek, Frank

    2009-01-01

    In preparation for the project and for anticipated review in August, the HIFS-VNL hosted an NDCX-II Advisory Meeting at LBNL on May 27, 2009. A number of experts in accelerator physics, engineering, and construction were asked to visit for a full day, listen to presentations on the project, its goals, and its status, and to offer their advice on how best to proceed, what topics needed attention, and what technical options seemed most attractive to them. This was a productive meeting, and the Committee's comments will provide useful guidance.

  20. Implementation of MOAS II diagnosis system at the OECD Halden Reactor project

    International Nuclear Information System (INIS)

    Kim, I.S.; Grini, R.E.; Nilsen, S.

    1995-01-01

    MOAS II is a surveillance and diagnosis system that uses several techniques for knowledge acquisition and diagnostic reasoning, e.g., goal tree-success tree, simplified directed graphs, diagnosis trees, and detailed knowledge of the process, such as mass or energy balance. This new approach was used at the Halden Man-Machine Laboratory of the OECD Halden Reactor Project. The performance of MOAS II, developed in G2 real-time expert system shell for the high-pressure preheaters of the NORS process, was tested against a variety of transient scenarios, including failures of control valves and sensors, and leakage of tubes of the preheaters. These tests showed that MOAS II successfully carried out its intended functions, i.e., quickly recognizing an occurring disturbance, correctly diagnosing its cause, and presenting advice on its control to the operator. The insights gained during the implementation are discussed

  1. Coal pump

    Science.gov (United States)

    Bonin, John H.; Meyer, John W.; Daniel, Jr., Arnold D.

    1983-01-01

    A device for pressurizing pulverized coal and circulating a carrier gas is disclosed. This device has utility in a coal gasification process and eliminates the need for a separate collection hopper and eliminates the separate compressor.

  2. Report on investigations in fiscal 2000 on the basic investigation on promotion of joint implementation. Project to utilize coal bed methane gas for power generation in Poland; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Poland tanko methane gas hatsuden riyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Having the Mining Industry Restructuring Public Corporation located in the city of Katowice, Poland as the counterpart, a feasibility study has been executed on a project to utilize coal bed gas for power generation. Selected for the study are the 'Budryk coal mine' owned by KWK 'Budryk' Coal Company and the 'Pniowek coal mine' owned by Jastrzebie Coal Company. Since the Pniowek coal mine can utilize the whole quantity of recovered methane by 2001, the Budryk coal mine was selected as the object of the project. As a result of the trial calculation on the economy when the new gas power plant is installed in the Budryk coal mine, the energy substitution effect was found to equal to a power amount at transmission terminal of 6 MWh/year. Furthermore, when proliferation effect is taken into consideration, an enormous effect can be expected if new coal mines are developed and the existing cola mines will go further deeper, because the Silesian coal mine presently has the coal resource quantity of 57 billion tons and the annual gas discharge quantity of 750 million m{sup 3}. Therefore, if the technologies to recover, manage and utilize the gas are established at the Budryk coal mine, a large effect leading to an aspiration would be expected under the current situation of the structural reorganization under which the Polish coal companies are placed. (NEDO)

  3. Monitoring, field experiments, and geochemical modeling of Fe(II) oxidation kinetics in a stream dominated by net-alkaline coal-mine drainage, Pennsylvania, USA

    Science.gov (United States)

    Cravotta,, Charles A.

    2015-01-01

    Watershed-scale monitoring, field aeration experiments, and geochemical equilibrium and kinetic modeling were conducted to evaluate interdependent changes in pH, dissolved CO2, O2, and Fe(II) concentrations that typically take place downstream of net-alkaline, circumneutral coal-mine drainage (CMD) outfalls and during aerobic treatment of such CMD. The kinetic modeling approach, using PHREEQC, accurately simulates observed variations in pH, Fe(II) oxidation, alkalinity consumption, and associated dissolved gas concentrations during transport downstream of the CMD outfalls (natural attenuation) and during 6-h batch aeration tests on the CMD using bubble diffusers (enhanced attenuation). The batch aeration experiments demonstrated that aeration promoted CO2 outgassing, thereby increasing pH and the rate of Fe(II) oxidation. The rate of Fe(II) oxidation was accurately estimated by the abiotic homogeneous oxidation rate law −d[Fe(II)]/dt = k1·[O2]·[H+]−2·[Fe(II)] that indicates an increase in pH by 1 unit at pH 5–8 and at constant dissolved O2 (DO) concentration results in a 100-fold increase in the rate of Fe(II) oxidation. Adjusting for sample temperature, a narrow range of values for the apparent homogeneous Fe(II) oxidation rate constant (k1′) of 0.5–1.7 times the reference value of k1 = 3 × 10−12 mol/L/min (for pH 5–8 and 20 °C), reported by Stumm and Morgan (1996), was indicated by the calibrated models for the 5-km stream reach below the CMD outfalls and the aerated CMD. The rates of CO2 outgassing and O2ingassing in the model were estimated with first-order asymptotic functions, whereby the driving force is the gradient of the dissolved gas concentration relative to equilibrium with the ambient atmosphere. Although the progressive increase in DO concentration to saturation could be accurately modeled as a kinetic function for the conditions evaluated, the simulation of DO as an instantaneous equilibrium process did not affect the

  4. Protocol in NORM industries. Central thermal coal production; Protocolo de actuacion en industrial NORM. Centrales de produccion termica de carbon

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Mora, J. C.; Corbacho, J. A.; Baeza, A.; Cancio, D.

    2011-07-01

    This protocol arises from the execution of R and D project Study of the radiological impact of coal power plants on their environment, funded by the Nuclear Safety Council. Its main objective was to assess the radiological impact exerted on workers and their environments, the four coal-fired power more currently in Spain: As Pontes (A Coruna), Compostilla II (Leon ),Litoral (Almeria) and Andorra (Teruel). (Author)

  5. A study of toxic emissions from a coal-fired power plant utilizing an ESP while demonstrating the ICCT CT-121 FGD Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-16

    The US Department of Energy is performing comprehensive assessments of toxic emissions from eight selected coal-fired electric utility units. This program responds to the Clean Air Act Amendments of 1990, which require the US Environmental Protection Agency (EPA) to evaluate emissions of hazardous air pollutants (HAPs) from electric utility power plants for Potential health risks. The resulting data will be furnished to EPA utility power plants and health risk determinations. The assessment of emissions involves the collection and analysis of samples from the major input, process, and output streams of each of the eight power plants for selected hazardous Pollutants identified in Title III of the Clean Air Act. Additional goals are to determine the removal efficiencies of pollution control subsystems for these selected pollutants and the Concentrations associated with the particulate fraction of the flue gas stream as a function of particle size. Material balances are being performed for selected pollutants around the entire power plant and several subsystems to identify the fate of hazardous substances in each utility system. Radian Corporation was selected to perform a toxics assessment at a plant demonstrating an Innovative Clean Coal Technology (ICCT) Project. The site selected is Plant Yates Unit No. 1 of Georgia Power Company, which includes a Chiyoda Thoroughbred-121 demonstration project.

  6. Observed Type II supernova colours from the Carnegie Supernova Project-I

    Science.gov (United States)

    de Jaeger, T.; Anderson, J. P.; Galbany, L.; González-Gaitán, S.; Hamuy, M.; Phillips, M. M.; Stritzinger, M. D.; Contreras, C.; Folatelli, G.; Gutiérrez, C. P.; Hsiao, E. Y.; Morrell, N.; Suntzeff, N. B.; Dessart, L.; Filippenko, A. V.

    2018-06-01

    We present a study of observed Type II supernova (SN II) colours using optical/near-infrared photometric data from the Carnegie Supernovae Project-I. We analyse four colours (B - V, u - g, g - r, and g - Y) and find that SN II colour curves can be described by two linear regimes during the photospheric phase. The first (s1, colour) is steeper and has a median duration of ˜40 d. The second, shallower slope (s2, colour) lasts until the end of the `plateau' (˜80 d). The two slopes correlate in the sense that steeper initial colour curves also imply steeper colour curves at later phases. As suggested by recent studies, SNe II form a continuous population of objects from the colour point of view as well. We investigate correlations between the observed colours and a range of photometric and spectroscopic parameters including the absolute magnitude, the V-band light-curve slopes, and metal-line strengths. We find that less luminous SNe II appear redder, a trend that we argue is not driven by uncorrected host-galaxy reddening. While there is significant dispersion, we find evidence that redder SNe II (mainly at early epochs) display stronger metal-line equivalent widths. Host-galaxy reddening does not appear to be a dominant parameter, neither driving observed trends nor dominating the dispersion in observed colours. Intrinsic SN II colours are most probably dominated by photospheric temperature differences, with progenitor metallicity possibly playing a minor role. Such temperature differences could be related to differences in progenitor radius, together with the presence or absence of circumstellar material close to the progenitor stars.

  7. Technical realisation of the VISA-II project, phase I, part IV, IZ-165-o268-1962

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1962-12-01

    Project VISA-II is described in IX chapters as follows: introduction, definition of experiments and possibilities of performance; VISA-II channel, new experimental space in the RA reactor; hydraulic tests in the VISA-II channel; measurement of fast neutron and gamma flux in VISA-II channels; measurement of water flow through different VISA-2 irradiation capsules; fabrication of VISA-II capsules; corrosion and heavy water purity problems; safety problems of experiment VISA-2; experimental operation of VISA-II. This chapter VI includes documentation for each type of capsule, review about each experiment within the VISA-II project, the objective and purpose of the experiment as well as experimental device [sr

  8. National Coal Quality Inventory (NACQI)

    Energy Technology Data Exchange (ETDEWEB)

    Robert Finkelman

    2005-09-30

    The U.S. Geological Survey (USGS) conducted the National Coal Quality Inventory (NaCQI) between 1999 and 2005 to address a need for quality information on coals that will be mined during the next 20-30 years. Collaboration between the USGS, State geological surveys, universities, coal burning utilities, and the coal mining industry plus funding support from the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) permitted collection and submittal of coal samples for analysis. The chemical data (proximate and ultimate analyses; major, minor and trace element concentrations) for 729 samples of raw or prepared coal, coal associated shale, and coal combustion products (fly ash, hopper ash, bottom ash and gypsum) from nine coal producing States are included. In addition, the project identified a new coal reference analytical standard, to be designated CWE-1 (West Elk Mine, Gunnison County, Colorado) that is a high-volatile-B or high-volatile-A bituminous coal with low contents of ash yield and sulfur, and very low, but detectable contents of chlorine, mercury and other trace elements.

  9. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    Science.gov (United States)

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  10. Fly ash from a Mexican mineral coal. II. Source of W zeolite and its effectiveness in arsenic (V) adsorption

    International Nuclear Information System (INIS)

    Medina, Adriana; Gamero, Procoro; Almanza, Jose Manuel; Vargas, Alfredo; Montoya, Ascencion; Vargas, Gregorio; Izquierdo, Maria

    2010-01-01

    Coal-fired plants in Coahuila (Mexico) produce highly reactive fly ash (MFA), which is used in a one-step process as a raw material in producing zeolite. We explored two routes in the synthesis of zeolite: (a) direct MFA zeolitization, which resulted in the formation of W zeolite with KOH and analcime with NaOH and (b) a MFA fusion route, which resulted in the formation of zeolite W or chabazite with KOH and zeolite X or P with NaOH. No residual crystalline phases were present. When LiOH was employed, ABW zeolite with quartz and mullite were obtained. For both zeolitization routes, the nature of the alkali (KOH, NaOH, LiOH), the alkali/MFA ratio (0.23-1.46), and the crystallization temperature and time (90-175 o C; 8-24 h) were evaluated. Additionally, the effect of temperature and time on MFA fusion was studied. W zeolite was obtained by both zeolitization methods. The direct route is preferred because it is a straightforward method using soft reaction conditions that results in a high yield of low cost zeolites with large crystal agglomerates. It was demonstrated that aluminum modified W zeolite has the ability to remove 99% of the arsenic (V) from an aqueous solution of Na 2 HAsO 4 .7H 2 O originally containing 740 ppb.

  11. Volatilisation of aromatic hydrocarbons from soil: part II, fluxes from coal tar contaminated soils residing below the soil surface

    International Nuclear Information System (INIS)

    Lindhardt, B.; Christensen, T.H.

    1996-01-01

    The non-steady-state fluxes of aromatic hydrocarbons from coal tar contaminated soil, placed below a 5 cm deep layer of uncontaminated soil, were measured in the laboratory over a period of 53 days. The contaminated soil originated from a former gasworks site and contained concentrations of 11 selected aromatic hydrocarbons between 50 to 840 μg/cm 3 . Where the microbial activity was inhibited, the fluxes stabilized on a semi-steady-state level for the monocyclic aromatic hydrocarbons, naphthalene and 1-methylnaphthalene after a period of 10-20 days. Fluxes of acenaphthene and fluorene were only measurable in an experiment that utilized a cover soil with a low organic content. The fluxes were predicted by a numerical model assuming that the compounds acted independently of each other and that local equilibrium between the air, water, and sorbed phases existed. The model overestimated the fluxes for all the detected aromatic hydrocarbons by a factor of 1.3 to 12. When the cover soil was adapted to degrade naphthalene, the fluxes of naphthalene and 1-methylnaphthalene approached the detection limit after 5 to 8 days. Thereafter the fluxes of these two compounds were less than predicted by the model employing half-life values of 0.5 and 1 day for naphthalene and 1-methylnaphthalene respectively. 10 refs., 6 figs., 7 tabs

  12. Fly ash from a Mexican mineral coal. II. Source of W zeolite and its effectiveness in arsenic (V) adsorption

    Energy Technology Data Exchange (ETDEWEB)

    Medina, Adriana [CINVESTAV IPN-Unidad Saltillo, Carretera Saltillo-Monterrey Km 13.5, C.P. 25900, Ramos Arizpe, Coahuila (Mexico); Gamero, Procoro, E-mail: pgamerom@hotmail.com [CINVESTAV IPN-Unidad Saltillo, Carretera Saltillo-Monterrey Km 13.5, C.P. 25900, Ramos Arizpe, Coahuila (Mexico); Almanza, Jose Manuel [CINVESTAV IPN-Unidad Saltillo, Carretera Saltillo-Monterrey Km 13.5, C.P. 25900, Ramos Arizpe, Coahuila (Mexico); Vargas, Alfredo; Montoya, Ascencion [Instituto Mexicano del Petroleo, Eje Central Lazaro Cardenas 152, G.A. Madero, C.P. 07730, Distrito Federal (Mexico); Vargas, Gregorio [CINVESTAV IPN-Unidad Saltillo, Carretera Saltillo-Monterrey Km 13.5, C.P. 25900, Ramos Arizpe, Coahuila (Mexico); Izquierdo, Maria [Instituto de Ciencias de la Tierra ' Jaume Almera' , CSIC, C/Luis Sole Sabaris, s/n 08028 Barcelona (Spain)

    2010-09-15

    Coal-fired plants in Coahuila (Mexico) produce highly reactive fly ash (MFA), which is used in a one-step process as a raw material in producing zeolite. We explored two routes in the synthesis of zeolite: (a) direct MFA zeolitization, which resulted in the formation of W zeolite with KOH and analcime with NaOH and (b) a MFA fusion route, which resulted in the formation of zeolite W or chabazite with KOH and zeolite X or P with NaOH. No residual crystalline phases were present. When LiOH was employed, ABW zeolite with quartz and mullite were obtained. For both zeolitization routes, the nature of the alkali (KOH, NaOH, LiOH), the alkali/MFA ratio (0.23-1.46), and the crystallization temperature and time (90-175 {sup o}C; 8-24 h) were evaluated. Additionally, the effect of temperature and time on MFA fusion was studied. W zeolite was obtained by both zeolitization methods. The direct route is preferred because it is a straightforward method using soft reaction conditions that results in a high yield of low cost zeolites with large crystal agglomerates. It was demonstrated that aluminum modified W zeolite has the ability to remove 99% of the arsenic (V) from an aqueous solution of Na{sub 2}HAsO{sub 4}.7H{sub 2}O originally containing 740 ppb.

  13. 46 CFR 111.105-35 - Vessels carrying coal.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Vessels carrying coal. 111.105-35 Section 111.105-35...-GENERAL REQUIREMENTS Hazardous Locations § 111.105-35 Vessels carrying coal. (a) The following are Class II, Division 1, (Zone 10 or Z) locations on a vessel that carries coal: (1) The interior of each coal...

  14. Fiscal 1998 research report. Improvement project of low-grade coals in Chongqing City, China for CO{sub 2} reduction (Feasibility study on the production business of coal- biomass briquette); 1998 nendo chosa hokokusho. CO{sub 2} sakugen no tame no Chuka Jinmin Kyowakoku Jukei chokkatsushi no teihin'i sekitanshitsu no kaizen project (Bio briquette seizo jigyo no chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the effect of introduction of production technology of coal-biomass briquette (Japanese coal improvement technology) in Chongqing City on reduction of greenhouse effect gases and acid rain causative substances, and sustainable economic growth. The study result on the feasibility of this project and reduction of greenhouse effect gases was summarized. In this feasibility study, Japan-China joint field survey, and both proximate and ultimate analyses of obtained raw materials were carried out. Based on the experimental result in the pilot briquette plant in Chongqing City, study was made on the necessary of the 1 Mtons/y class pilot plant in the pilot area including Nantong coal mine in Chongqing City, and the location, investment, production cost and distribution means of the plant. Based on the evaluation result on CO{sub 2} reduction effect, economical efficiency, environment effect and social effect, its urgency and effectiveness as international cooperation project by yen credit were also confirmed. It is extremely important to promote localization of the plant in the future. (NEDO)

  15. Fiscal 1998 research report. Improvement project of low-grade coals in Chongqing City, China for CO{sub 2} reduction (Feasibility study on the production business of coal- biomass briquette); 1998 nendo chosa hokokusho. CO{sub 2} sakugen no tame no Chuka Jinmin Kyowakoku Jukei chokkatsushi no teihin'i sekitanshitsu no kaizen project (Bio briquette seizo jigyo no chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Feasibility study was made on the effect of introduction of production technology of coal-biomass briquette (Japanese coal improvement technology) in Chongqing City on reduction of greenhouse effect gases and acid rain causative substances, and sustainable economic growth. The study result on the feasibility of this project and reduction of greenhouse effect gases was summarized. In this feasibility study, Japan-China joint field survey, and both proximate and ultimate analyses of obtained raw materials were carried out. Based on the experimental result in the pilot briquette plant in Chongqing City, study was made on the necessary of the 1 Mtons/y class pilot plant in the pilot area including Nantong coal mine in Chongqing City, and the location, investment, production cost and distribution means of the plant. Based on the evaluation result on CO{sub 2} reduction effect, economical efficiency, environment effect and social effect, its urgency and effectiveness as international cooperation project by yen credit were also confirmed. It is extremely important to promote localization of the plant in the future. (NEDO)

  16. Fiscal 1998 engineer interexchange project (coal mine technology field). Preliminary survey on the international interexchange project in America; 1998 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Jizen chosa (Beikoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    As a part of the fiscal 1998 international interexchange project in a coal mine technology field, the survey was made in America. Geological engineering problem has large effect on the protection and productivity of underground coal mines. Promotion of long wall mining has contributed to reduction of disasters, however, recently deaths due to roof collapse and wall collapse are on the increase. A roof evaluation technique was developed for adequate selection of mining methods and support design, and its standardization and diffusion are in promotion. Integration and improvement advanced in facility technology because of worldwide integration by acquisition of coal mine facility manufacturers. Introduction of high-power high-capacity facilities is increasing with introduction of large long wall working faces, and development of rear transport system technology and labor saving by remote control are also in promotion according to such trend. As automation and labor saving technology of mining facilities, the automated direction detection and control system by laser and gyroscope is under development. (NEDO)

  17. Demonstration of advanced combustion NO(sub X) control techniques for a wall-fired boiler. Project performance summary, Clean Coal Technology Demonstration Program

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The project represents a landmark assessment of the potential of low-NO(sub x) burners, advanced overtire air, and neural-network control systems to reduce NO(sub x) emissions within the bounds of acceptable dry-bottom, wall-fired boiler performance. Such boilers were targeted under the Clean Air Act Amendments of 1990 (CAAA). Testing provided valuable input to the Environmental Protection Agency ruling issued in March 1994, which set NO(sub x) emission limits for ''Group 1'' wall-fired boilers at 0.5 lb/10(sup 6) Btu to be met by January 1996. The resultant comprehensive database served to assist utilities in effectively implementing CAAA compliance. The project is part of the U.S. Department of Energy's Clean Coal Technology Demonstration Program established to address energy and environmental concerns related to coal use. Five nationally competed solicitations sought cost-shared partnerships with industry to accelerate commercialization of the most advanced coal-based power generation and pollution control technologies. The Program, valued at over$5 billion, has leveraged federal funding twofold through the resultant partnerships encompassing utilities, technology developers, state governments, and research organizations. This project was one of 16 selected in May 1988 from 55 proposals submitted in response to the Program's second solicitation. Southern Company Services, Inc. (SCS) conducted a comprehensive evaluation of the effects of Foster Wheeler Energy Corporation's (FWEC) advanced overfire air (AOFA), low-NO(sub x) burners (LNB), and LNB/AOFA on wall-fired boiler NO(sub x) emissions and other combustion parameters. SCS also evaluated the effectiveness of an advanced on-line optimization system, the Generic NO(sub x) Control Intelligent System (GNOCIS). Over a six-year period, SCS carried out testing at Georgia Power Company's 500-MWe Plant Hammond Unit 4 in Coosa, Georgia. Tests proceeded in a logical sequence using rigorous statistical analyses to

  18. 15 years of Spanish participation in the international projects of R and D coal technology coordinated by OCICARBON; 15 Anos de Participacion Espanola en los foros Internacionales de I+D Tecnologico del Carbon coordinados por OCICARBON

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    As fulfillment of strategy objectives, OCICARBON ( the Spanish Management Association for Coal Research and Development Projects) has maintained a strong link with European and International entities, devoted to coal research and development activities. As consequence of these collaborations, it has been reached uncountable economical and technological benefits, from the projects carried out by Spanish industries and technological entities, under the European Programmes umbrella. In this summary report, it is informed about how the co-ordination of national and international entities, was organised and structured; and the national results, obtained as consequence of the activities carried out by OCICARBON. (Author)

  19. Buckets of money for coal

    International Nuclear Information System (INIS)

    Anon

    2001-01-01

    The revival of coal prices is providing record profits for Australian coal producers. As the world's largest coal exporter, any move in coal prices has significant ramifications for the Australian economy. The coal boom of the mid-1980s resulted in a massive increase in mine capacity and subsequently excess supply. This resulted in the decade between 1990 and 2000 seeing benchmark prices for coking coal in Japan plummeting to $US 39 a tonne (down from around the $US 52 mark) and a price of $US 28 for a tonne of steaming coal. Asia's financial problems, late in the decade coupled with a rapid fall in Asian steel making, also added to our coal export woes. As a result for most of the 1990s, Australia's coal sector delivered inadequate returns, was seen as over-capitalised and suffered from a profound investor indifference. But the sector is now seeing a definite turnaround in fortunes. Prices for thermal coal are on the rise and the benchmark coking coal prices to Asia have also jumped. Market analysts reported the price for contract deliveries of thermal coal in April this year were $US 34.50 ($AUD 69.35) up by $US 5.75 from the same time last year. The increased production is expected on the back of a continued rise in export demand, further improvement in prices, significant improvements in mine productivity, a weak Australian dollar and the probability of new projects and mine extensions going into operation. The improved returns have also flowed into rising valuations for listed coal miners. Over the last year, coal miners such as MIM and Gympie Gold, have delighted in share price gains of 12 per cent and 55 per cent respectively. These sort of performances are being repeated across the Australian industry

  20. IAEA fast reactor knowledge preservation initiative. Project focus: KNK-II reactor, Karlsruhe, Germany

    International Nuclear Information System (INIS)

    2004-08-01

    This Working Material (including the attached CD-ROM) documents progress made in the IAEA's initiative to preserve knowledge in the fast reactor domain. The brochure describes briefly the context of the initiative and gives an introduction to the contents of the CD-ROM. In 2003/2004 a first focus of activity was concentrated on the preservation of knowledge related to the KNK-II experimental fast reactor in Karlsruhe, Germany. The urgency of this project was given by the impending physical destruction of the installation, including the office buildings. Important KNK-II documentation was brought to safety and preserved just in time. The CD-ROM contains the full texts of 264 technical and scientific documents describing research, development and operating experience gained with the KNK-II installation over a period of time from 1965 to 2002, extending through initial investigations, 17 years of rich operating experience, and final shutdown and decommissioning. The index to the documents on the CD-ROM is printed at the end of this booklet in chronological order and is accessible on the CD by subject index and chronological index. The CD-ROM contains in its root directory also the document 'fr c lassification.pdf' which describes the classification system used for the present collection of documents on the fast reactor KNK-II

  1. Characterizing toxic emissions from a coal-fired power plant demonstrating the AFGD ICCT Project and a plant utilizing a dry scrubber/baghouse system: Bailly Station Units 7 and 8 and AFGD ICCT Project. Final report. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Dismukes, E.B.

    1994-10-20

    This report describes results of assessment of the risk of emissions of hazardous air pollutants at one of the electric power stations, Bailly Station, which is also the site of a Clean Coal Technology project demonstrating the Pure Air Advanced Flue Gas Desulfurization process (wet limestone). This station represents the configuration of no NO{sub x} reduction, particulate control with electrostatic precipitators, and SO{sub 2} control with a wet scrubber. The test was conducted September 3--6, 1993. Sixteen trace metals were determined along with 5 major metals. Other inorganic substances and organic compounds were also determined.

  2. U.S. coal outlook in Asia

    International Nuclear Information System (INIS)

    Johnson, C.J.

    1997-02-01

    Coal exports from the US to Asia are declining over time as a result of (1) increased competition from coal suppliers within the Asia-Pacific region, (2) changing steel making technologies, (3) decreased emphasis on security of coal supplies, and (4) deregulation of the energy industry--particularly electric utilities. There are no major changes on the horizon that are likely to alter the role of the US as a modest coal supplier to the Asia-Pacific region. The downward trend in US coal exports to Asia is expected to continue over the 1997--2010 period. But economic and policy changes underway in Asia are likely to result in periodic coal shortages, lasting a few months to a year, and short term increased export opportunities for US coal. US coal exports to Asia are projected to fluctuate within the following ranges over the 2000--2010 period: 10--17 million tons in total exports, 6--12 million tons in thermal coal exports, and 4--9 million tons in coking coal exports. The most important role for US coal, from the perspective of Asian coal importing countries, is to ensure a major alternative source of coal supplies that can be turned to in the event of unforeseen disruptions in coal supplies from the Asia-Pacific region or South Africa. However, the willingness of consumers to pay a premium to ensure US export capacity is declining, with increased emphasis on obtaining the lowest cost coal supplies

  3. Exploratory research on solvent refined coal liquefaction. Annual technical progress report, January 1-December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This report summarizes the progress of the Exploratory Research on Solvent Refined Coal Liquefaction project by The Pittsburg and Midway Coal Mining Co.'s Merriam Laboratory during 1979. In a series of experiments with varying feed gas composition, low levels (5 to 10 mole %) of carbon monoxide had little effect on the SRC II processing of Pittsburgh Seam coal (Powhatan No. 5 Mine) while higher levels (20 to 40 mole %) resulted in a general degradation of operability and reduced oil yields. Addition of finely divided (approx. 1 ..mu..m) pyrite to the reactive Powhatan coal had little effect on oil yields although the molecular weight of the distillation residue was apparently decreased. When finely divided pyrite and magnetite were added to the less reactive coals from the Loveridge and Blacksville No. 1 Mines (also Pittsburgh Seam), however, substantial increases in oil yields and product quality were obtained. In a comparison of upflow and downflow dissolver configurations with Powhatan coal in the SRC II mode, there was no difference in yields or product quality. A study characterizing specific reactors revealed a significantly higher conversion in the SRC I mode with a reactor approximating plug flow conditions compared to a completely backmixed reactor. In the SRC II mode there was only a slightly higher oil yield with the plug flow reactor.

  4. Report on the achievements in the Sunshine Project in fiscal 1988. Development of a coal liquefaction technology (Liquefaction performance test on Chinese coals); 1988 nendo sekitan ekika gijutsu kaihatsu, Chugokutan ekika seino shiken seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-03-01

    Development has been carried out on a Chinese coal liquefaction technology jointly by Japan and China. The Japanese side fabricated and built a small continuous testing equipment. Shenbei coal produced in Liaoning Province, Tienju coal produced in Gansu Province and Shenmu coal produced in Shaanxi Province were used as test sample coals. These coals were crushed, washed with water, sorted, dried, pulverized below 100 mesh, and used as the test samples. For catalysts, a reagent Fe{sub 2}O{sub 3} and S as an auxiliary catalyst made in China were used. Anthracene oil freed from crystal was used as a starting solvent when making one-through operation and recycling operation. Hydrogen used had purity of 99.5% or higher. The current fiscal year has performed smoothly to the end either of the one-through operation or the solvent circulating operation on RUN-2200, 2300 (Chenbei coal) and 2,400, 2500 (Tienju coal). Operation of 2600, 2700 (Shenmu coal) experienced noise in the stirrer of the reactor, and leakage of the circulating gas from the recycled gas compressor. In addition, the differential pressure during operating the last run has increased to 50 k, when the temperature and pressure were reduced, and substances clogging the reactor inlet line were removed. Three kinds of the liquefied oils were brought back to Japan for detailed analyses. (NEDO)

  5. Technical realisation of the VISA-II Project, Phase II, Chapter X, Vol. VI; Tehnicka realizacija projekta VISA-II, II faza, Glava X, Album VI

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M; Nikolic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-01-15

    The second phase of the 'Project VISA-2 described in this chapter of Vol. VI includes the project specifications and technical drawings of the 'measuring system of VISA-2 for testing the VISA-2 channels outside and in the reactor'. In addition to the task objective, description of the measuring system, action plan, description of the work done it contains the definition of the task 'Leak testing' and instructions for the instrumentation personnel on duty. [Serbo-Croat] Druga faza zadatka {sup T}ehnicka realizacija projekta VISA-2' opisana u ovom poglavlju Albuma VI, sadrzi tehnicki opis i crteze 'Mernog sistema VISA-2 i ispitivanje kanala VISA-2 van reaktora i u reaktoru'. Pored definicije zadatka, opisa mernog sistema VISA-2, razrade zadatka, tekstualnog dela projekta i opisa izvedenih radova, ovo poglavlje obuhvata definiciju i razradu podzadatka 'Ispitivanje hermeticnosti' i dodatak sa instrukcijama za dezurne instrumentatore u vezi eksperimenta VISA-2.

  6. Report on the achievements in the Sunshine Project in fiscal 1990 on research and development of coal energy. Studies on coal liquefying catalysts and a method for analyzing liquefied oil; 1990 nendo sekitan ekikayo shokubai oyobi ekikayu bunsekiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1990 on research of coal liquefying catalysts and a method for analyzing liquefied oil. Regenerating deteriorated hydrogenating catalysts for coal liquefied oil makes the restoration non-reversible because of residual sulfate. Discussions were given on the regenerating mechanisms. It was found that adding Ru enhances activity of an Ni-Mo catalyst for hydrogenating denitrification and hydrogenation. In studying coal liquefying reaction, a basic study was performed to analyze a catalytic mechanism in the hydrogenating decomposition. Sequential lightening reaction process is being analyzed at molecular levels on coal, preasphaltene, asphaltene and oil. Investigations were carried out on hydrogenating denitrification, deoxygenation, ring opening, decomposition mechanism and catalytic action. A study on precision structural analysis has begun on PSU circulating solvent as a NEDO bituminous coal liquefaction supporting technology. In fiscal 1990, a preliminary study was performed to identify the overall image of the composition of the Wandoan coal liquefied oil. Detailed analysis was executed on naphthalenes and their hydrides. This paper also describes composition analysis and reaction analysis by using the GC/MS ion chromatogram method. It also dwells on the study on catalyst utilizing systems. (NEDO)

  7. Computerized transportation model for the NRC Physical Protection Project. Versions I and II

    International Nuclear Information System (INIS)

    Anderson, G.M.

    1978-01-01

    Details on two versions of a computerized model for the transportation system of the NRC Physical Protection Project are presented. The Version I model permits scheduling of all types of transport units associated with a truck fleet, including truck trailers, truck tractors, escort vehicles and crews. A fixed-fleet itinerary construction process is used in which iterations on fleet size are required until the service requirements are satisfied. The Version II model adds an aircraft mode capability and provides for a more efficient non-fixed-fleet itinerary generation process. Test results using both versions are included

  8. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis

    Directory of Open Access Journals (Sweden)

    Tańczuk Mariusz

    2017-01-01

    Full Text Available District heating technologies should be efficient, effective and environmentally friendly. The majority of the communal heating systems in Poland produce district hot water in coal-fired boilers. A large number of them are considerably worn out, low-efficient in the summer time and will not comply with forthcoming regulations. One of the possible solution for such plants is repowering with new CHP systems or new boilers fuelled with fuels alternative to coal. Optimisation analysis of the target configuration of municipal heat generating plant is analysed in the paper. The work concerns repowering the existing conventional heat generating plant according to eight different scenarios of the plant configuration meeting technical and environmental requirements forecasted for the year of 2035. The maximum demand for heat of the system supplied by the plant is 185 MW. Taking into account different technical configurations on one side, and different energy and fuel prices on the other side, the comparative cost-benefits analysis of the assumed scenarios has been made. The basic economical index NPV (net present value has been derived for each analysed scenario and the results have been compared and discussed. It was also claimed that the scenario with CHP based on ICE engines is optimal.

  9. Projected configuration of a coal-fired district heating source on the basis of comparative technical-economical optimization analysis

    Science.gov (United States)

    Tańczuk, Mariusz; Radziewicz, Wojciech; Olszewski, Eligiusz; Skorek, Janusz

    2017-10-01

    District heating technologies should be efficient, effective and environmentally friendly. The majority of the communal heating systems in Poland produce district hot water in coal-fired boilers. A large number of them are considerably worn out, low-efficient in the summer time and will not comply with forthcoming regulations. One of the possible solution for such plants is repowering with new CHP systems or new boilers fuelled with fuels alternative to coal. Optimisation analysis of the target configuration of municipal heat generating plant is analysed in the paper. The work concerns repowering the existing conventional heat generating plant according to eight different scenarios of the plant configuration meeting technical and environmental requirements forecasted for the year of 2035. The maximum demand for heat of the system supplied by the plant is 185 MW. Taking into account different technical configurations on one side, and different energy and fuel prices on the other side, the comparative cost-benefits analysis of the assumed scenarios has been made. The basic economical index NPV (net present value) has been derived for each analysed scenario and the results have been compared and discussed. It was also claimed that the scenario with CHP based on ICE engines is optimal.

  10. Australian coal

    Energy Technology Data Exchange (ETDEWEB)

    1985-11-01

    Total export shipments of coal in Australia in the year ending June 30 1985 reached a record of 83.8 Mt. The export trade is expected to bring in an income of 4 billion Australian dollars in the current year making coal Australia's biggest revenue-earning export commodity. This article presents a brief overview of the Australian coal industry with production and export statistics and information on major open pit and underground mines.

  11. Report on the research achievements in the Sunshine Project in fiscal 1992. Studies on liquefying reaction in coal, and reforming and utilization of the products; 1992 nendo sekitan no ekika hanno to seiseibutsu no kaishitsu riyo no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1992 in studies on liquefying reaction in coal, and reforming of the products. High conversion rate was attained in the co-treatment of bitumen and Taiheiyo coals by using highly dispersing oil soluble solvent without performing coking, even if the asphaltene concentration is high. When a very highly acidic trifluoromethane sulfonic acid catalyst is used, hydrogenation and conversion to solubilized low molecules is possible even with a solvent having low affinity with coal. Swelling effect by tetralin is remarkable in pulverized coal, and the conversion rate was improved greatly under high-pressure hydrogen. When naphtha of the Wandoan coal liquefied oil is given extraction treatment with base and acid/base, the gas production decreases noticeably when hydrogenating and refining the extracts, resulting in reduced hydrogen consumption and improved oil recovery rate. Furthermore, when the extraction treated naphtha is hydrogenated, denitrification can be achieved completely. Kerosene and light oil liquefied from the Wandoan coal were cracked by fluidity contact, whereas the light gravity product yield due to the decomposition was found low because of containing a great amount of two-ring aromatics. The pressure crystal deposition method using solvent is effective in separation of high-melting point compounds including anthracene from heavy gravity oil. (NEDO)

  12. FY 2000 report on the survey of the overseas geological structure. Japan-China joint coal exploration - Yu Xian project; 2000 nendo kaigai chishitsu kozo nado chosa hokokusho. Nippon Chugoku sekitan kyodo tansa Yu Xian project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The geological survey was carried out which is needed for coal mine design in the Yu Xian coal mine area, Yu Xian coal field, Hebei province, China. The term of survey was 5 years from 1996 to 2000. Activities are mainly for seismic survey and boring survey. Japan was in charge of the seismic survey, and China in charge of the boring survey. Both attained the goal. The results of the activities were summed up in the following 7 items: 1) outline of the survey; 2) general investigation; 3) state of the exploration related materials/machinery; 4) field survey; 5) items of survey; 6) results of the survey; 7) conclusion. In 6), the geological analysis, coal quality survey and coal amount survey were conducted. In the geological analysis, analyzed were the succession of strata, geological structure, and the situation of existence of coal seams. In 7), the following were made clear: geological structure of the survey area, coal seam, coal quality, hydrological geology, other conditions of drilling technology, and coal amount. The coal amount was 328.34 million tons in a total of A/B/C class coals. The total coal amount of Nos. 1 and 5 coal seams was 259.79 million tons, which was 79.1% of the total coal amount in all area. The average thickness of Nos. 1 and 5 coal seams, which are the main minable coal seams, was 3.10m and 2.66m, respectively. (NEDO)

  13. Coal - 96

    International Nuclear Information System (INIS)

    Sparre, C.

    1996-09-01

    The report deals mainly with coal consumption, but also gives some information about technology, environmental aspects and markets. Data have been collected by questionnaires or via telephone. The use of steam coal for heating was 0.8 Mtons (down 20% from 1994). Cogeneration plants were the main users. Taxes and environmental reasons cause a reduction of the coal use that will probably continue the next years. Use of steam coal in industry has been constant at a level of 0.7 Mtons. The import of metallurgical coal rests constant at a level of 1.6 Mtons. 1.2 Mtons of coke was produced, and 0.3 Mtons imported. The PFBC-plant at Vaertan, Stockholm used 0.13 Mtons of coal, while some coal fired power plants have been converted to peat and wood fuels. The average price of steam coal imported to Sweden in 1995 was 333 SEK/ton, 6% higher than in 1994. The contract prices for delivery 1996 are about the same as at the end of 1995. All cogeneration plants have some sort of SO 2 removal system, mostly wet-dry. The largest plant, at Vaesteraas, has recently invested in a SCR system for NO x removal. Most other plants are using low NO x burners or SNCR systems, based on ammonia or urea, which reduce the emissions 50 - 70%. Some statistic about the world coal market is also given in the report

  14. Projection of coal prices in international turnover in comparison to other primary energy sources; Przewidywane ceny wegla w handlu miedzynarodowym w porownaniu z innymi nosnikami energii pierwotnej

    Energy Technology Data Exchange (ETDEWEB)

    Gawlik, L.; Grudzinski, Z. [Polish Academy of Sciences, Krakow (Poland). Mineral and Energy Economy Institute

    2004-07-01

    The paper looks at trends in both steam coal and coking coal prices up to the year 2000 and then compares the trends of coal with crude oil and natural gas for the years 1987-2001. It presents forecasts for fossil fuel prices up to the year 2015. Despite temporary fluctuation, prices of coal are predicted to remain relatively stable as far as 2030, with a slight tendency to grow. 11 refs., 6 figs., 1 tab.

  15. The power of Indonesian coal

    Energy Technology Data Exchange (ETDEWEB)

    Rosiak, T. [Duke/Fluor Daniel (United States)

    2003-02-01

    The paper presents three Indonesian projects carried out by Duke/Fluor Daniel whose unique construction and operation have demonstrated the versatility and value of coal-fired power generation. These are: the construction of units 7 and 8 of the Paiton Private Power Project, a 1230 MW pulverised coal plant in Paiton, East Java; construction of a coal fired generation plant and transmission system to provide power for the expansion of a copper and gold mine on the island of Papua; and construction of four 28 MW pulverized coal units to provide 'heavy lifting' for a new mine at Batu Hijau on the island of Sumbawa. Coal was found to cost less than diesel for power generation. 2 photos.

  16. Report on the achievements in the Sunshine Project in fiscal 1986. Surveys on coal type selection and surveys on coal types (Data file); 1986 nendo tanshu sentei chosa tanshu chosa seika hokokusho. Data file

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    This data file is a data file concerning coal types for liquefaction in the report on the achievements in the surveys on coal type selection and on coal types (JN0040843). Such items of information were filed as existence and production of coals, various kinds of analyses, and test values relative to data for liquefaction tests that have been collected and sent to date. The file consists of two files of a test sample information file related to existence and production of coals and coal mines, and an analysis and test file accommodating the results of different analyses and tests. However, the test sample information files (1) through (6) have not been put into order on such items of information as test samples and sample collection, geography, geology, ground beds, coal beds, coal mines, development and transportation. The analysis and test file contains (7) industrial analyses, (8) element analysis, (9) ash composition, (10) solubility of ash, (11) structure analysis, (12) liquefaction characteristics (standard version), (13) analysis of liquefaction produced gas, (14) distillation characteristics of liquefaction produced oil, (15) liquefaction characteristics (simplified version), (16) analysis of liquefaction produced gas (simplified version), and (17) distillation characteristics of liquefaction produced oil (simplified version). However, the information related to liquefaction test using a tubing reactor in (15) through (17) has not been put into order. (NEDO)

  17. CSNI Project for Fracture Analyses of Large-Scale International Reference Experiments (FALSIRE II)

    Energy Technology Data Exchange (ETDEWEB)

    Bass, B.R.; Pugh, C.E.; Keeney, J. [Oak Ridge National Lab., TN (United States); Schulz, H.; Sievers, J. [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Koeln (Gemany)

    1996-11-01

    A summary of Phase II of the Project for FALSIRE is presented. FALSIRE was created by the Fracture Assessment Group (FAG) of the OECD/NEA`s Committee on the Safety of Nuclear Installations (CNSI) Principal Working Group No. 3. FALSIRE I in 1988 assessed fracture methods through interpretive analyses of 6 large-scale fracture experiments in reactor pressure vessel (RPV) steels under pressurized- thermal-shock (PTS) loading. In FALSIRE II, experiments examined cleavage fracture in RPV steels for a wide range of materials, crack geometries, and constraint and loading conditions. The cracks were relatively shallow, in the transition temperature region. Included were cracks showing either unstable extension or two stages of extensions under transient thermal and mechanical loads. Crack initiation was also investigated in connection with clad surfaces and with biaxial load. Within FALSIRE II, comparative assessments were performed for 7 reference fracture experiments based on 45 analyses received from 22 organizations representing 12 countries. Temperature distributions in thermal shock loaded samples were approximated with high accuracy and small scatter bands. Structural response was predicted reasonably well; discrepancies could usually be traced to the assumed material models and approximated material properties. Almost all participants elected to use the finite element method.

  18. CSNI Project for Fracture Analyses of Large-Scale International Reference Experiments (FALSIRE II)

    International Nuclear Information System (INIS)

    Bass, B.R.; Pugh, C.E.; Keeney, J.; Schulz, H.; Sievers, J.

    1996-11-01

    A summary of Phase II of the Project for FALSIRE is presented. FALSIRE was created by the Fracture Assessment Group (FAG) of the OECD/NEA's Committee on the Safety of Nuclear Installations (CNSI) Principal Working Group No. 3. FALSIRE I in 1988 assessed fracture methods through interpretive analyses of 6 large-scale fracture experiments in reactor pressure vessel (RPV) steels under pressurized- thermal-shock (PTS) loading. In FALSIRE II, experiments examined cleavage fracture in RPV steels for a wide range of materials, crack geometries, and constraint and loading conditions. The cracks were relatively shallow, in the transition temperature region. Included were cracks showing either unstable extension or two stages of extensions under transient thermal and mechanical loads. Crack initiation was also investigated in connection with clad surfaces and with biaxial load. Within FALSIRE II, comparative assessments were performed for 7 reference fracture experiments based on 45 analyses received from 22 organizations representing 12 countries. Temperature distributions in thermal shock loaded samples were approximated with high accuracy and small scatter bands. Structural response was predicted reasonably well; discrepancies could usually be traced to the assumed material models and approximated material properties. Almost all participants elected to use the finite element method

  19. Wet treatment of low-quality coal. II stage. Pilot Plant; Tratamiento en fase humeda de carbones de baja calidad 2 fase: planta piloto

    Energy Technology Data Exchange (ETDEWEB)

    1999-09-01

    At this second stage, the project was aimed at determining the appropriate operating conditions which permit the use of slack with a high ratio of inert materials after a treatment by means of wet oxidation at thigh pressure as well as carrying out an economic feasibility study. Based on the conclusions of the first stage, four representative samples were selected and the pilot plant for testing the influence of different process variables was designed. Continuous tests were conducted and the basic engineering was determined (process diagram, material, energy and equipment balances). An economic analysis for the erecting of an industrial plant for the treatment of low-quality coal using this technology was also carried out in order to establish whether a short-term or medium-term profitability of the required investment for the erecting could be achieved. It can be deduced from both the theoretical and experimental studies carried out that the technology of wet oxidation can be applied to the treatment of slacks, but the energetic efficiency of the reaction is so low that its use is not advisable for the proposed purposes. (Author)

  20. OC5 Project Phase II: Validation of Global Loads of the DeepCwind Floating Semisubmersible Wind Turbine

    DEFF Research Database (Denmark)

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.

    2017-01-01

    This paper summarizes the findings from Phase II of the Offshore Code Comparison, Collaboration, Continued, with Correlation project. The project is run under the International Energy Agency Wind Research Task 30, and is focused on validating the tools used for modeling offshore wind systems thro...

  1. Achievement report for fiscal 1999 on project for supporting the formation of energy/environmental technology verification project. International joint verification research project (Verification project relative to ignition and NOx reduction using plasma sub-burner in pulverized coal-fired furnace); 1999 nendo plasma sabubana ni yoru bifuntan nenshoro ni okeru chakka oyobi NO{sub x} teigen gijutsu ni kansuru jissho project seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project is executed through the cooperation of a Russian research institute, Akita Prefectural University, and the Ishikawajima-Harima Heavy Industries Co., Ltd. In the development of a plasma sub-burner and the basic research for its verification, a pulverized coal burning plasma sub-burner is designed and fabricated, a basic burning experiment is conducted for the plasma sub-burner, and plasma stabilization in a pulverized coal flow is simulated. In the verification study of the ignition by the plasma sub-burner in a pulverized coal-fired furnace, it is found that the newly-developed plasma sub-burner satisfies the prescribed operating conditions in the system and that the ignition of pulverized coal takes place across the air ratio range of 0.5-1.5 when pulverized coal is fed to the sub-burner. It is also found that NOx is reduced a great deal when a plasma operating on an orifice gas of air or nitrogen is generated in a gas which contains NOx. (NEDO)

  2. National Centers for Environmental Prediction-Department of Energy (NCEP-DOE) Atmospheric Model Intercomparison Project (AMIP)-II Reanalysis (Reanalysis-2)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The NCEP-DOE Atmospheric Model Intercomparison Project (AMIP-II) reanalysis is a follow-on project to the "50-year" (1948-present) NCEP-NCAR Reanalysis Project....

  3. The World Coal Quality Inventory: South America

    Science.gov (United States)

    Karlsen, Alex W.; Tewalt, Susan J.; Bragg, Linda J.; Finkelman, Robert B.

    2006-01-01

    Executive Summary-Introduction: The concepts of a global environment and economy are strongly and irrevocably linked to global energy issues. Worldwide coal production and international coal trade are projected to increase during the next several decades in an international energy mix that is still strongly dependent on fossil fuels. Therefore, worldwide coal use will play an increasingly visible role in global environmental, economic, and energy forums. Policy makers require information on coal, including coal quality data, to make informed decisions regarding domestic coal resource allocation, import needs and export opportunities, foreign policy objectives, technology transfer policies, foreign investment prospects, environmental and health assessments, and byproduct use and disposal issues. The development of a worldwide, reliable, coal quality database would help ensure the most economically and environmentally efficient global use of coal. The U.S. Geological Survey (USGS), in cooperation with many agencies and scientists from the world's coal producing countries, originally undertook a project to obtain representative samples of coal from most of the world's producing coal provinces during a limited period of time (roughly 1998-2005), which is called the World Coal Quality Inventory (WoCQI). The multitude of producing coal mines, coal occurrences, or limited accessibility to sites in some countries can preclude collecting more than a single sample from a mine. In some areas, a single sample may represent an entire coal mining region or basin. Despite these limitations in sampling and uneven distribution of sample collection, the analytical results can still provide a general overview of world coal quality. The USGS intends to present the WoCQI data in reports and, when possible, in Geographic Information System (GIS) products that cover important coal bearing and producing regions.

  4. Report on the FY 1999 project for training coal engineers. Advanced course; 1999 nendo sekitan gijutsusha yosei jigyo hokokusho. Jokyusha course

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This is a report on the training for coal technology which two Japanese engineers received in Australia. In Chapter 3 (Outline of Australia), they studied the national land, constitution of the national land, population, history, politics, economy and trade. In Chapter 4 (Coal geology), they read lecture data of university. In Chapter 5 (Outline of coal supply/demand), the coal export amount from Australia is 167 million tons. Steam coal of a little less than 50% is exported to Japan. In Chapter 6 (Coal mining technology), 100 million tons of NSW state and 100 million and 570 thousand tons of QLD state are mined by underground mining and open pit mining. Training was conducted on overburden/drilling/transportation of the open pit mining coal. As coal mining methods of underground mining, they learned the board and pillar coal mining and high wall mining as an extension of open pit mining. In Chapter 7 (Coal preparation), they observed/studied the jig, heavy media separator, heavy media cyclone separator, flotation equipment, spiral ore dressing equipment, fine powder centrifugal dewatering equipment, thickener, sieve, etc. They studied by data or by observation in Chapters 8 (Outline of coal mine), 9 (Outline of export port), 10 (Outline of railroad transportation), and 11 (Quality management). (NEDO)

  5. Clean coal technology: The new coal era

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The Clean Coal Technology Program is a government and industry cofunded effort to demonstrate a new generation of innovative coal processes in a series of full-scale showcase`` facilities built across the country. Begun in 1986 and expanded in 1987, the program is expected to finance more than $6.8 billion of projects. Nearly two-thirds of the funding will come from the private sector, well above the 50 percent industry co-funding expected when the program began. The original recommendation for a multi-billion dollar clean coal demonstration program came from the US and Canadian Special Envoys on Acid Rain. In January 1986, Special Envoys Lewis and Davis presented their recommendations. Included was the call for a 5-year, $5-billion program in the US to demonstrate, at commercial scale, innovative clean coal technologies that were beginning to emerge from research programs both in the US and elsewhere in the world. As the Envoys said: if the menu of control options was expanded, and if the new options were significantly cheaper, yet highly efficient, it would be easier to formulate an acid rain control plan that would have broader public appeal.

  6. Coal Mine Health and Safety Regulation 2006 under the Coal Mine Health and Safety Act 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-12-22

    The aim of the Act is to secure the health, safety and welfare of people in connection with coal operations (which include all places of work where coal is mined and certain other places). The Regulation contains provisions about the following matters: (a) places of work to which the Act does not apply, (b) duties relating to health, welfare and safety at coal operations, including the following: (i) the nomination of the operator of a coal operation and the provision of health and safety information for incoming operators, (ii) the contents of health and safety management systems for coal operations, (iii) major hazards and the contents of major hazard management plans for coal operations, (iv) duties relating to contractors, (v) the contents of management structures and emergency management systems for coal operations, escape and rescue plans and fire fighting plans and high risk activities, (c) notifications, including (i) notification of incidents, (ii) inquiries, (iii) notification of other matters to the Chief Inspector), (d) aspects of safety at coal operations, including the following: (i) controlled materials, plants and practices, (ii) coal dust explosion prevention and suppression, (iii) ventilation at coal operations, (iv) escape from coal operations, (v) the operation of transport at coal operations, (vi) surveys and certified plans, (vii) employment at coal operations, (e) the licensing of certain activities, (f) competence standards, (g) the Coal Competence Board, (h) check inspectors, (i) exemptions from provisions of this Regulation, (j) the following miscellaneous matters concerning coal mine health and safety: (i) the keeping of records and reporting, (ii) penalties, the review of decisions by the Administrative Decisions Tribunal, fees and charges, consultation, information and other miscellaneous matters, (k) savings and transitional provisions.

  7. PNNL Coal Gasification Research

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Douglas J.; Cabe, James E.; Bearden, Mark D.

    2010-07-28

    This report explains the goals of PNNL in relation to coal gasification research. The long-term intent of this effort is to produce a syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in materials, catalysts, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for 4 hours using coal feedstock. In addition, system modifications to increase operational flexibility and reliability or accommodate other fuel sources that can be used for syngas production could be useful.

  8. Preliminary Conceptual Design Report for the FACET-II Project at SLAC National Accelerator Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, Mark [SLAC National Accelerator Lab., Menlo Park, CA (United States)

    2016-04-22

    Plasma wakefield acceleration has the potential to dramatically shrink the size and cost of particle accelerators. Research at the SLAC National Accelerator Laboratory has demonstrated that plasmas can provide 1,000 times the acceleration in a given distance compared with current technologies. Developing revolutionary and more efficient acceleration techniques that allow for an affordable high-energy collider is the focus of FACET, a National User Facility at SLAC. The existing FACET National User Facility uses part of SLAC’s two-mile-long linear accelerator to generate high-density beams of electrons and positrons. FACET-II is a new test facility to develop advanced acceleration and coherent radiation techniques with high-energy electron and positron beams. It is the only facility in the world with high energy positron beams. FACET-II provides a major upgrade over current FACET capabilities and the breadth of the potential research program makes it truly unique. It will synergistically pursue accelerator science that is vital to the future of both advanced acceleration techniques for High Energy Physics, ultra-high brightness beams for Basic Energy Science, and novel radiation sources for a wide variety of applications. The design parameters for FACET-II are set by the requirements of the plasma wakefield experimental program. To drive the plasma wakefield requires a high peak current, in excess of 10kA. To reach this peak current, the electron and positron design bunch size is 10μ by 10μ transversely with a bunch length of 10μ. This is more than 200 times better than what has been achieved at the existing FACET. The beam energy is 10 GeV, set by the Linac length available and the repetition rate is up to 30 Hz. The FACET-II project is scheduled to be constructed in three major stages. Components of the project discussed in detail include the following: electron injector, bunch compressors and linac, the positron system, the Sector 20 sailboat and W chicanes

  9. International Coal Report's coal year 1991

    Energy Technology Data Exchange (ETDEWEB)

    McCloskey, G [ed.

    1991-05-31

    Following introductory articles on factors affecting trade in coal and developments in the freight market, tables are given for coal exports and coal imports for major countries worldwide for 1989 and 1990. Figures are also included for coal consumption in Canada and the Eastern bloc,, power station consumption in Japan, coal supply and demand in the UK, electric utility coal consumption and stocks in the USA, coal production in Australia, Canada and USA by state, and world hard coal production. A final section gives electricity production and hard coal deliveries in the EEC, sales of imported and local coal and world production of pig iron and steel.

  10. Coal fires in Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Whitehouse, Alfred E.; Mulyana, Asep A.S. [Office of Surface Mining/Ministry of Energy and Mineral Resources Coal Fire Project, Ministry of Energy and Mineral Resources, Agency for Training and Education, Jl. Gatot Subroto, Kav. 49, Jakarta 12950 (Indonesia)

    2004-07-12

    Indonesia's fire and haze problem is increasingly being ascribed to large-scale forest conversion and land clearing activities making way for pulpwood, rubber and oil palm plantations. Fire is the cheapest tool available to small holders and plantation owners to reduce vegetation cover and prepare and fertilize extremely poor soils. Fires that escaped from agricultural burns have ravaged East Kalimantan forests on the island of Borneo during extreme drought periods in 1982-1983, 1987, 1991, 1994 and 1997-1998. Estimates based on satellite data and ground observations are that more than five million hectares were burned in East Kalimantan during the 1997/1998 dry season. Not only were the economic losses and ecological damage from these surface fires enormous, they ignited coal seams exposed at the ground surface along their outcrops.Coal fires now threaten Indonesia's shrinking ecological resources in Kutai National Park and Sungai Wain Nature Reserve. Sungai Wain has one of the last areas of unburned primary rainforest in the Balikpapan-Samarinda area with an extremely rich biodiversity. Although fires in 1997/1998 damaged nearly 50% of this Reserve and ignited 76 coal fires, it remains the most valuable water catchment area in the region and it has been used as a reintroduction site for the endangered orangutan. The Office of Surface Mining provided Indonesia with the capability to take quick action on coal fires that presented threats to public health and safety, infrastructure or the environment. The US Department of State's Southeast Asia Environmental Protection Initiative through the US Agency for International Development funded the project. Technical assistance and training transferred skills in coal fire management through the Ministry of Energy and Mineral Resource's Training Agency to the regional offices; giving the regions the long-term capability to manage coal fires. Funding was also included to extinguish coal fires as

  11. Development of coal energy utilization technologies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Coal liquefaction produces new and clean energy by performing hydrogenation, decomposition and liquefaction on coal under high temperatures and pressures. NEDO has been developing bituminous coal liquefaction technologies by using a 150-t/d pilot plant. It has also developed quality improving and utilization technologies for liquefied coal, whose practical use is expected. For developing coal gasification technologies, construction is in progress for a 200-t/d pilot plant for spouted bed gasification power generation. NEDO intends to develop coal gasification composite cycle power generation with high efficiency and of environment harmonious type. This paper summarizes the results obtained during fiscal 1994. It also dwells on technologies to manufacture hydrogen from coal. It further describes development of technologies to manufacture methane and substituting natural gas (SNG) by hydrogenating and gasifying coal. The ARCH process can select three operation modes depending on which of SNG yield, thermal efficiency or BTX yield is targeted. With respect to promotion of coal utilization technologies, description is given on surveys on development of next generation technologies for coal utilization, and clean coal technology promotion projects. International coal utilization and application projects are also described. 9 figs., 3 tabs.

  12. Biomass CFB gasifier connected to a 350 MW{sub t}h steam boiler fired with coal and natural gas - THERMIE demonstration project in Lahti in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, J. [Foster Wheeler Energia Oy, Varkaus (Finland). Varkaus Global New Products

    1997-12-31

    Laempoevoima Oy`s Kymijaervi power plant gasification project is to demonstrate the direct gasification of wet biofuel and the use of hot, raw and very low-calorific gas directly in the existing coal-fired boiler. The gasification of biofuels and co-combustion of gases in the existing coal-fired boiler offers many advantages such as: recycling of CO{sub 2}, decreased SO{sub 2} and NO{sub x} emissions, efficient way to utilize biofuels and recycled refuse fuels, low investment and operation costs, and utilization of the existing power plant capacity. Furthermore, only small modifications are required in the boiler, possible disturbances in the gasifier do not shut down the power plant. (author)

  13. Biomass CFB gasifier connected to a 350 MW{sub t}h steam boiler fired with coal and natural gas - THERMIE demonstration project in Lahti in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Palonen, J [Foster Wheeler Energia Oy, Varkaus (Finland). Varkaus Global New Products

    1998-12-31

    Laempoevoima Oy`s Kymijaervi power plant gasification project is to demonstrate the direct gasification of wet biofuel and the use of hot, raw and very low-calorific gas directly in the existing coal-fired boiler. The gasification of biofuels and co-combustion of gases in the existing coal-fired boiler offers many advantages such as: recycling of CO{sub 2}, decreased SO{sub 2} and NO{sub x} emissions, efficient way to utilize biofuels and recycled refuse fuels, low investment and operation costs, and utilization of the existing power plant capacity. Furthermore, only small modifications are required in the boiler, possible disturbances in the gasifier do not shut down the power plant. (author)

  14. Report on the achievements in the Sunshine Project in fiscal 1992 on research and development of coal energy. Studies on coal liquefying catalysts and a method for analyzing liquefied oil; 1992 nendo sekitan ekikayo shokubai oyobi ekikayu bunsekiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1992 on research of coal liquefying catalysts and a method for analyzing liquefied oil. Oxidative regeneration was performed on an Ni-W based waste catalyst used in reforming (hydrogenating) coal liquefied light oil fraction. If the regeneration can be done with low oxygen partial pressure and step-wise temperature rise, the activity after the regeneration can be restored to the level of a new catalyst, with sulfate production being suppressed. Model reaction was discussed by changing the amount of W and Mo carried by alumina. Suppressing the carrying amount can control the hydrogenation activity and the hydrogenating decomposition activity. Comparison was given on compositions of woods and such hydrogenation products as peat and coal. Analysis was performed on composition of the circulating solvent used in the NEDO bituminous coal liquefying PSU. In the initial stage of the operation, the solvent had higher concentrations in the groups of compounds not having alkyl groups, and compounds having the alkyl groups increased in the end of the operation. Discussions were given also on index materials to control the operation of solvent hydrogenating process. Efficient preparation conditions were discussed on an iron sulfide particulate catalyst that utilizes surface reaction of a solid metal while mechanical impact such as vibration is being given. Effects of the catalyst concentration in coal liquefaction were experimented by using oil soluble molybdenum, wherein no change was found in the reaction mechanism. (NEDO)

  15. Biochemical Removal of HAP Precursors From Coal

    International Nuclear Information System (INIS)

    Olson, G.; Tucker, L.; Richards, J.

    1997-07-01

    This project addresses DOE's interest in advanced concepts for controlling emissions of air toxics from coal-fired utility boilers. We are determining the feasibility of developing a biochemical process for the precombustion removal of substantial percentages of 13 inorganic hazardous air pollutant (HAP) precursors from coal. These HAP precursors are Sb, As, Be, Cd, Cr, Cl, Co, F, Pb, Hg, Mn, Ni, and Se. Although rapid physical coal cleaning is done routinely in preparation plants, biochemical processes for removal of HAP precursors from coal potentially offer advantages of deeper cleaning, more specificity, and less coal loss. Compared to chemical processes for coal cleaning, biochemical processes potentially offer lower costs and milder process conditions. Pyrite oxidizing bacteria, most notably Thiobacillusferrooxidans, are being evaluated in this project for their ability to remove HAP precursors from U.S. coals

  16. Biochemical Removal of HAP Precursors From Coal

    Energy Technology Data Exchange (ETDEWEB)

    Olson, G.; Tucker, L.; Richards, J.

    1997-07-01

    This project addresses DOE`s interest in advanced concepts for controlling emissions of air toxics from coal-fired utility boilers. We are determining the feasibility of developing a biochemical process for the precombustion removal of substantial percentages of 13 inorganic hazardous air pollutant (HAP) precursors from coal. These HAP precursors are Sb, As, Be, Cd, Cr, Cl, Co, F, Pb, Hg, Mn, Ni, and Se. Although rapid physical coal cleaning is done routinely in preparation plants, biochemical processes for removal of HAP precursors from coal potentially offer advantages of deeper cleaning, more specificity, and less coal loss. Compared to chemical processes for coal cleaning, biochemical processes potentially offer lower costs and milder process conditions. Pyrite oxidizing bacteria, most notably Thiobacillusferrooxidans, are being evaluated in this project for their ability to remove HAP precursors from U.S. coals.

  17. Coal's sleeping market: non-utility generators

    International Nuclear Information System (INIS)

    McMahan, R.L.; Knutson, K.S.

    1992-01-01

    The article briefly profiles the coal market for non-utility generation (NUG). Coal consumption by NUGs, currently estimated at around 6.1 million tons, is projected to reach nearly 13.6 million tons by 1995 and 21.2 million tons by 2000. If the projected growth is achieved the NUG market may become one of the strongest market segments for the coal industry into the next century. 3 figs., 2 tabs

  18. Groundwater and underground coal gasification in Alberta

    International Nuclear Information System (INIS)

    Haluszka, A.; MacMillan, G.; Maev, S.

    2010-01-01

    Underground coal gasification has potential in Alberta. This presentation provided background information on underground coal gasification and discussed groundwater and the Laurus Energy demonstration project. A multi-disciplined approach to project assessment was described with particular reference to geologic and hydrogeologic setting; geologic mapping; and a hydrogeologic numerical model. Underground coal gasification involves the conversion of coal into synthesis gas or syngas. It can be applied to mined coal at the surface or applied to non-mined coal seams using injection and production wells. Underground coal gasification can effect groundwater as the rate of water influx into the coal seams influences the quality and composition of the syngas. Byproducts created include heat as well as water with dissolved concentrations of ammonia, phenols, salts, polyaromatic hydrocarbons, and liquid organic products from the pyrolysis of coal. A process overview of underground coal gasification was also illustrated. It was concluded that underground coal gasification has the potential in Alberta and risks to groundwater could be minimized by a properly designed project. refs., figs.

  19. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  20. Pelletization of fine coals. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, K.V.S.

    1995-12-31

    Coal is one of the most abundant energy resources in the US with nearly 800 million tons of it being mined annually. Process and environmental demands for low-ash, low-sulfur coals and economic constraints for high productivity are leading the coal industry to use such modern mining methods as longwall mining and such newer coal processing techniques as froth flotation, oil agglomeration, chemical cleaning and synthetic fuel production. All these processes are faced with one common problem area--fine coals. Dealing effectively with these fine coals during handling, storage, transportation, and/or processing continues to be a challenge facing the industry. Agglomeration by the unit operation of pelletization consists of tumbling moist fines in drums or discs. Past experimental work and limited commercial practice have shown that pelletization can alleviate the problems associated with fine coals. However, it was recognized that there exists a serious need for delineating the fundamental principles of fine coal pelletization. Accordingly, a research program has been carried involving four specific topics: (i) experimental investigation of coal pelletization kinetics, (ii) understanding the surface principles of coal pelletization, (iii) modeling of coal pelletization processes, and (iv) simulation of fine coal pelletization circuits. This report summarizes the major findings and provides relevant details of the research effort.

  1. Clean coal technology

    International Nuclear Information System (INIS)

    Abelson, P.H.

    1990-01-01

    One of the major technology challenges in the next decade will be to develop means of using coal imaginatively as a source of chemicals and in a more energy-efficient manner. The Clean Air Act will help to diminish the acid rain but will not reduce CO 2 emissions. The Department of Energy (DOE) is fostering many innovations that are likely to have a positive effect on coal usage. Of the different innovations in the use of coal fostered by DOE, two are of particular interest. One is the new pressurized fluid bed combustion (PFBC) combined-cycle demonstration. The PFBC plant now becoming operational can reduce SO 2 emissions by more than 90% and NO x emissions by 50-70%. A second new technology co-sponsored by DOE is the Encoal mild coal gasification project that will convert a sub-bituminous low-BTU coal into a useful higher BTU solid while producing significant amounts of a liquid fuel

  2. Bright outlook for coal

    International Nuclear Information System (INIS)

    Anon

    2001-01-01

    After enduring contract price cuts over the past two years of almost 17% for thermal coal and 23% for hard coking coal, the New South Wales coal industry is looking forward to a reversal of fortune for 2001. Increased export demand, improved prices, significant improvements in mine site productivity, a weak Australian dollar and the probability of a number of new projects or extensions progressing to development are likely to result in an increase in NSW saleable production to around 110 million tonnes (Mt) in 2000-01. Sharply weaker coal prices over the past two years, intensified international competition and the Asian economic downturn had a negative impact on profitability, investment, exports and employment in the NSW coal industry. As a result, the industry has undergone substantial restructuring. The restructuring process has led to a consolidation in ownership, reduced production costs and improved operational efficiency. The outcome is an industry well positioned to take advantage of the positive market conditions and one likely to experience levels of profitability not achieved over the past few years

  3. Coal liquids -- Who needs them?

    International Nuclear Information System (INIS)

    Gray, D.; Tomlinson, G.

    1995-01-01

    The paper discusses the global energy demand situation as presented at the last World Energy Congress. The total energy demand was calculated for each country and projected to 2100. The paper then discusses the energy situation in the United States, especially the forecasted demand for crude oil and natural gas liquids. Imports will be needed to make up the shortfall in domestic production. The shortfall in conventional petroleum could be supplied by converting coal into liquid fuels. Currently the cost of high quality coal liquids is too high to compete with petroleum, but trends suggest that the price will be competitive in the year 2030 using current technology. Continuing research on coal liquefaction will reduce the price of coal liquids so that coal liquids could play a significant role sooner

  4. Coal competitiveness?

    International Nuclear Information System (INIS)

    Rogeaux, B.

    2006-01-01

    Will coal electrical plants be more competitive in the coming years? Answering this one cannot be limited to merely comparing estimates based on reference electricity production costs. The competitiveness of coal will indeed depend on the final product marketed, as the MWhs are not equal: is the purpose to produce base, half-base MWh? Does the electrical equipment structure require flexible MWh (for instance in the event of significant intermittent renewable energy amounts), and therefore plants able to adjust their power rapidly? But the competitiveness of coal will also depend on many factors that will correct reference cost estimates: uncertainties, risks, externalities. These factors will need to be appreciated on a case by case basis. We introduce some of the reasoning used to better appreciate the future competitiveness of coal, and the main factors conditioning it in three contrasting regions of the world: Europe, USA, china. (author)

  5. Materials information for science and technology (MIST): Project overview: Phases I and II and general considerations

    Energy Technology Data Exchange (ETDEWEB)

    Grattidge, W.; Westbrook, J.; McCarthy, J.; Northrup, C. Jr.; Rumble, J. Jr.

    1986-01-01

    This report documents the initial phases of the Materials Information for Science and Technology (MIST) project jointly supported by the Department of Energy and the National Bureau of Standards. The purpose of MIST is to demonstrate the power and utility of computer access to materials property data. The initial goals include: to exercise the concept of a computer network of materials databases and to build a demonstration of such a system suitable for use as the core of operational systems in the future. Phases I and II are described in detail herein. In addition, a discussion is given of the expected usage of the system. The primary MIST prototype project is running on an IBM 3084 under STS at the Stanford University's Information Technology Services (ITS). Users can access the Stanford system via ARPANET, TELENET, and TYMNET, as well as via commercial telephone lines. For fastest response time and use of the full screen PRISM interface, direct connection using a 2400 baud modem with the MNP error-correcting protocol over standard telephone lines gives the best results - though slower speed connections and a line-oriented interface are also available. This report gives detailed plans regarding the properties to be enterend and the materials to be entered into the system.

  6. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  7. Solubilities of hydrogen and methane in coal liquids

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Ho-mu; Sebastian, H M; Simnick, J J; Chao, Kwang Chu

    1981-04-01

    The solubilities of hydrogen and methane in Exxon Donor Solvent (EDS) and Solvent Refined Coal II (SRC-II) coal liquids are determined at 190 and 270 C and pressures to 250 atm. Two narrow boiling distillate cuts from EDS and three from SRC-II are studied.

  8. Survey of state water laws affecting coal slurry pipeline development

    Energy Technology Data Exchange (ETDEWEB)

    Rogozen, M.B.

    1980-11-01

    This report summarizes state water laws likely to affect the development of coal slurry pipelines. It was prepared as part of a project to analyze environmental issues related to energy transportation systems. Coal slurry pipelines have been proposed as a means to expand the existing transportation system to handle the increasing coal shipments that will be required in the future. The availability of water for use in coal slurry systems in the coal-producing states is an issue of major concern.

  9. Preliminary survey report for fiscal 1999 on engineer exchange project (field of coal mining technology), international exchange project. Europe; 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo jizen chosa. Oshu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Europe, international division is in progress as the result of market internationalization, and the coal market is experiencing an increasingly intensive competition in the storm of deregulation. The coal industry of Britain is away from a crisis for the time being, thanks to a new 5-year contract concluded with the electric utilities who are the primary purchasers, but it has to compete with imported coal and natural gas. The industry is also hit by the control imposed on the development of new opencast coal mines. Production is on the decline in the German coal market, which is one the largest in Western Europe, due to reduced subsidies, unfavorable geological conditions, lowered price, etc. The German coal industry is positively striving to exploit coal mines overseas and to export coal mining technologies. In Spain and France, the coal industry is forced to shrink and, in France, there is a plan to terminate coal mining completely in 2005. In Poland, the introduction of market economy has resulted in the influx of low-price coal from Russia etc., and all the Polish mines are now in the red. Its joining the European Union in the near future will further increase the pressure from other nations. It is learned that in Britain, Germany, etc., coal businesses are accelerating their transfer of technology to developing countries and are positively strengthening their presence abroad. (NEDO)

  10. Coal - 97

    International Nuclear Information System (INIS)

    Sparre, C.

    1997-01-01

    The report deals with the use of coal and coke during 1996. Some information about techniques, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from SCB have also been used. The use of steam coal for heating purposes during 1996 was 1,2 mill tons and 50% higher than in 1995. The increase is probably temporary and due to high prices of electricity because of lack of water power. The co-generation plants were the main users of coal. The minor plants have increased their use of forest fuels. Probably the use of steam coal will go down in the immediate years both in the heat generating and the co-generation plants. During the top year 1987 coal was used in 18 hotwater plants and 11 co-generation plants. 1996 these figures are 3 and 12. Taxes and environmental reasons explain this trend. The use of steam coal in the industry has been constant at the level 700 000 tons. This level is supposed to be constant or to vary with business cycles. The import of metallurgical coal in 1996 was 1,6 mill tons like the year before. 1,2 mill tons coke were produced. The coke consumption in the industry was 1,5 mill tons. 0,3 mill tons of coke were imported. The average price of steam coal imported in Sweden in 1996 was 340 SEK/ton or 2% higher than in 1995. For the world, the average import price was 51,5 USD/ton, nearly the same as the year before. The contract prices for delivery during 1997 are about equal as the end of 1996. All Swedish plants meet their emission limits of dust, SO 2 and NO x given by county administrations or concession boards

  11. The PEP-II/BaBar Project-Wide Database using World Wide Web and Oracle*Case

    International Nuclear Information System (INIS)

    Chan, A.; Crane, G.; MacGregor, I.; Meyer, S.

    1995-12-01

    The PEP-II/BaBar Project Database is a tool for monitoring the technical and documentation aspects of the accelerator and detector construction. It holds the PEP-II/BaBar design specifications, fabrication and installation data in one integrated system. Key pieces of the database include the machine parameter list, components fabrication and calibration data, survey and alignment data, property control, CAD drawings, publications and documentation. This central Oracle database on a UNIX server is built using Oracle*Case tools. Users at the collaborating laboratories mainly access the data using World Wide Web (WWW). The Project Database is being extended to link to legacy databases required for the operations phase

  12. Coal mining situation in the Federal Republic of Germany. The 1st quarter 2010

    International Nuclear Information System (INIS)

    2010-01-01

    The report on coal mining situation in the Federal Republic of Germany in the 1st quarter 2010 contains the statistical data concerning the following issues: (i) black coal mining: part I: production, resources, accomplishments; employees, part II: marketing and foreign trade; (ii) brown coal mining: part I: production, resources, accomplishments; employees, part II: marketing and foreign trade.

  13. Power Generation from Coal 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This report focuses mainly on developments to improve the performance of coal-based power generation technologies, which should be a priority -- particularly if carbon capture and storage takes longer to become established than currently projected. A close look is taken of the major ongoing developments in process technology, plant equipment, instrumentation and control. Coal is an important source of energy for the world, particularly for power generation. To meet the growth in demand for energy over the past decade, the contribution from coal has exceeded that of any other energy source. Additionally, coal has contributed almost half of total growth in electricity over the past decade. As a result, CO2 emissions from coal-fired power generation have increased markedly and continue to rise. More than 70% of CO2 emissions that arise from power generation are attributed to coal. To play its role in a sustainable energy future, its environmental footprint must be reduced; using coal more efficiently is an important first step. Beyond efficiency improvement, carbon capture and storage (CCS) must be deployed to make deep cuts in CO2 emissions. The need for energy and the economics of producing and supplying it to the end-user are central considerations in power plant construction and operation. Economic and regulatory conditions must be made consistent with the ambition to achieve higher efficiencies and lower emissions. In essence, clean coal technologies must be more widely deployed.

  14. Coal -98

    International Nuclear Information System (INIS)

    Sparre, C.

    1998-01-01

    The following report deals with the use of coal and coke during 1997. Some information about technic, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from SCB have also been used. The use of steam coal for heating purposes during 1997 was 730 000 tons and about 500 000 tons lower than in 1996. The extremely high figures of 1996 were due to twice the production of electricity because of lack of hydro power. The co-generation plants were the main users of coal. The minor plants have increased their use of forest fuels. Probably the use of steam coal will go down in the immediate years both in the heat generating and the co-generating plants. Some foreign analysts, however, estimate a doubled use of coal for energy use after 2020 because of the plans to phase out the nuclear power. During the top year 1987 coal was used in 18 hot water plants and 11 co-generation plants. 1997 these figures are 2 and 8. Taxes and environmental reasons explain this trend. The use of steam coal in the industry has been constant at the level 700 000 tons. This level is supposed to be constant or to vary with business cycles. The import of metallurgical coal in 1997 was 1.6 mill tons like the year before. 1.2 mill tons coke were produced. The coke consumption in the industry was 1.5 Mill tons. 0.3 mill tons of coke were imported. Several other plants have plans to replace the coal with forest fuels, waste fuels and NG. Even the biggest plant, Vaesteraas, has plans to build a block for bio fuels. Helsingborg has started to use wood pellets. The pellets replace most of the coal for the heat production in the co-generation plant. Norrkoeping Kraft AB has taken a fluid bed boiler for different fuels in operation, leading to more than half the coal consumption compared with previous years. They have also rebuilt one of their travelling grates for bio fuels. Stockholm

  15. Summary of fish and wildlife information needs to surface mine coal in the United States. Part 3. A handbook for meeting fish and wildlife information needs to surface mine coal: OSM Region II. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hinkle, C.R.; Ambrose, R.E.; Wenzel, C.R.

    1981-02-01

    The report contains information to assist in protecting, enhancing, and reducing impacts to fish and wildlife resources during surface mining of coal. It gives information on the premining, mining, reclamation and compliance phases of surface mining. Methods and sources to obtain information to satisfy state and Federal regulations are presented. This volume is specifically for the states of Kentucky, Tennessee, North Carolina, South Carolina, Georgia, Alabama, Mississippi and Florida.

  16. Research report of FY 1997 on the environmentally acceptable coal utilization system introduction support project. Demonstration project of circulating fluidized bed boiler (Jinzhou Coal-Thermal Power Corporation); 1997 nendo seika hokokusho (kankyo chowagata sekitan riyo system donyu shien jigyo). Junkan ryudosho boiler ni kakawaru jissho jigyo (Jinzhou netsuden sokoji)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    To verify the clean coal technology to be diffused in China and consolidate its diffusion basis, demonstration project of circulating fluidized bed boiler was conducted through the cooperation with China which is positive in its introduction. This report describes its characteristics. Coal and limestone are supplied in a lower part of combustion chamber, and are mixed with circulating ash by fluidized air for combustion. Densely fluidized bed the same as the bubbling fluidized bed is formed in the lower part of combustion chamber, which provides excellent stability in ignition and combustion. Particles including ash, char and limestone formed during the combustion are discharged into the cyclone through the convection heat transfer part at the outlet of combustion chamber with the combustion gas flow. Since the gas temperature is lowered to 400 to 500degC at the convection heat transfer part, troubles of the ash circulating system can be prevented. The combustion gas separated from ash at the cyclone is discharged through the heat exchanger and precipitator, and the collected ash is returned to the lower part of combustion chamber. In FY 1997, design, fabrication, procurement/inspection, field survey/meeting, survey of visitors/meeting, and education were carried out. 4 figs., 4 tabs.

  17. FY 1980 Report on results of Sunshine Project. Development of coal liquefaction techniques (Development of materials for the coal liquefaction plant); 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sekitan ekika plant zairyo no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    A 1 T/D solvent-extraction type coal liquefaction test plant was constructed and operated to obtain the technical data for the design of, and establish the techniques for, an efficient coal liquefaction plant. The FY 1980 program includes surveys on the materials for coal liquefaction plants, covering those already developed and under development, to clarify the problematical points; drafting the test schedules; and conceptual designs of the material testing facilities. The major problems involved in the materials for coal liquefaction plants include erosion by fluidizing coal slurry, hydrogen embrittlement of the reactor materials, and corrosion by the liquefaction products (e.g., stress-corrosion cracking of austenitic steel, and corrosion by organic acids). The surveys on materials research trends suggest that USA seems to concentrate their research efforts on the reactor materials. The corrosion tests are mostly of in-plant tests, but the stress corrosion and slurry erosion tests are conducted on a laboratory scale. The conceptual designs are drawn for some testing units, e.g., the loop type material testing unit and basic testing unit for jet-spray type slurry erosion. (NEDO)

  18. Report on the achievements in the Sunshine Project in fiscal 1988. Coal energy (Studies on coal liquefying catalysts and a method for analyzing liquefied oil); 1988 nendo sekitan ekikayo shokubai oyobi ekikayu binsekiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-03-01

    The present study, as part of the studies on coal liquefying technologies, was originally intended to develop optimal catalysts that make it possible to manufacture a liquid fuel from hydrogenation treatment of coal, and establish optimal reaction operation for the liquefaction process. To achieve the intentions, studies were moved forward on the following four sub-themes: (1) fundamentals and developmental research on catalysts for the direct liquefaction, (2) chemical structures of organic constituents in the coal liquefaction process, (3) research on the optimal reaction operation in the direct coal liquefaction process, and (4) studies on nature and behavior of ash constituent in the coal liquefaction process. The current fiscal year has performed the discussions on the following items based on the achievements attained by fiscal 1987: 1. as a study on liquefaction catalysts, (1) a study on properties of liquefaction catalysts, and (2) a study on characteristics of the liquefying reaction; 2. as a study on the analytic method, (1) a study on the liquefying reaction analyzing method, and (2) a study on the liquefied oil property analyzing method. In Item 1-(1), a prototype zeolite-based catalyst having high hydrogenating decomposition activity was used to execute a reaction to lighten the liquefied oil. As a result, it was revealed that the liquefied oil can be lightened efficiently by having the oil go through a two-stage reforming reaction. (NEDO)

  19. Weaving Ecosystem Service Assessment into Environmental Impact Assessments of Thar Coal Field: Impact of Coal Mining on Socio-Ecological Systems of Rural Communities.

    Science.gov (United States)

    Hina, A.

    2016-12-01

    The Research takes into account Block II Mining and Power Plant Project of Thar Coal field in Pakistan by carrying out ecosystem service assessment of the region to identify the impact on important ecosystem service losses and the contribution of mining companies to mitigate the socio-economic problems as a part of their Corporate Social Responsibility (CSR). The study area includes 7 rural settlements, around 921 households and 7000 individuals, dependent on agriculture and livestock for their livelihoods. Currently, the project has adopted the methods of strip mining (also called open-cut mining, open-cast mining, and stripping), undergoing removing the overburden in strips to enable excavation of the coal seams. Since the consequences of mine development can easily spill across community and ecological boundaries, the rising scarcity of some ecosystem services makes the case to examine both project impact and dependence on ecosystem services. A preliminary Ecosystem Service review of Thar Coal Field identifies key ecosystems services owing to both high significance of project impact and high project dependence are highlighted as: the hydrogeological study results indicate the presence of at least three aquifer zones: one above the coal zone (the top aquifer), one within the coal and the third below the coal zone. Hence, Water is identified as a key ecosystem service to be addressed and valued due to its high dependency in the area for livestock, human wellbeing, agriculture and other purposes. Crop production related to agricultural services, in association with supply services such as soil quality, fertility, and nutrient recycling and water retention need to be valued. Cultural services affected in terms of land use change and resettlement and rehabilitation factors are recommended to be addressed.

  20. Coal 95

    International Nuclear Information System (INIS)

    Sparre, C.

    1995-01-01

    The report deals with the use of coal and coke in Sweden during 1994. Some information about technology, environmental questions and markets are also given. Data have been collected by questionnaires to major users and by telephone to minor users. Preliminary statistical data from Statistics Sweden have also been used.The use of steam coal for heating purposes has been unchanged during 1994 at a level of 1 Mtons. The production in the cogeneration plants has been constant, but has increased for electricity production. The minor plants have increased their use of forest fuels. The use of steam coal will probably go down in the next years both for heat and cogeneration plants. During the top year 1987 coal was used in 18 hot water and 11 cogeneration plants. 1994 these figures are 3 and 12. Taxes and environmental reasons explain this trend. The use of steam coal in industry has been constant at the level 0.7 Mtons. The import of metallurgical coal in 1993 was 1.6 Mtons, like 1992. Import of 0.3 Mtons of coke gives the total consumption of coke in industry as 1.5 Mtons. the average price of steam coal imported to Sweden was 317 SEK/ton, 3% higher than 1993. All Swedish plants meet their emission limit of dust, SO 2 and NO x as given by county administrations or concession boards. The cogeneration plants all have some SO 2 removal system. The biggest cogeneration plant (Vaesteraas) has recently invested in a SCR NO x cleaning system. Most other plants use low NO x burners or SNR injection systems based on ammonia or urea. 2 figs, 13 tabs

  1. The relationship with the Other as a platform for discussion about conflicts. Comments on the Orzesze coal mine project

    Directory of Open Access Journals (Sweden)

    Belzyt Joanna Iza

    2017-06-01

    Full Text Available An analysis was made of comments in media reports on the selected case, the „Orzesze” mining project, posted by Internet users on news websites during the period July 2014 - December 2016 This article is an attempt to examine the relationship with the Other/Alien when thinking about conflicts around investment projects which will interfere with the surrounding social and natural environment. The article considers the theories on the sources of conflict and the development of the conflict process and its consequences and suggests possible courses of action to prevent the escalation of such conflicts particularly with respect to the “Orzesze” mining project in the Upper Silesia, Poland. Taking into account that the Data, Relationship, Value, and Interest conflicts can all be sources of conflict, it should be underlined that good social communication is extremely important in the prevention and resolution of conflicts and the mitigation of their destructive influence. In a cooperation/communication oriented environment it would be much easier to focus on finding solutions rather than finding the guilty party as this can lead to an escalation of the conflict as searching for the guilty party is inextricably linked with the desire to win or to take revenge.

  2. Asia's coal and clean coal technology market potential

    International Nuclear Information System (INIS)

    Johnson, C.J.; Binsheng Li

    1992-01-01

    The Asian region is unique in the world in having the highest economic growth rate, the highest share of coal in total primary energy consumption and the highest growth rate in electricity generation capacity. The outlook for the next two decades is for accelerated efforts to control coal related emissions of particulates and SO 2 and to a lessor extent NO x and CO 2 . Only Japan has widespread use of Clean Coal Technologies (CCTs) however a number of economies have plans to install CCTs in future power plants. Only CCTs for electricity generation are discussed, and are defined for the purpose of this paper as technologies that substantially reduce SO 2 and/or NO x emissions from coal-fired power plants. The main theses of this paper are that major increases in coal consumption will occur over the 1990-2010 period, and this will be caccompanied by major increases in coal related pollution in some Asian economies. Coal fired electricity generation is projected to grow at a high rate of about 6.9 percent per year over the 1990-2010 period. CCTs are projected to account for about 150 GW of new coal-fired capacity over the 1990-2010 period of about one-third of all new coal-fired capacity. A speculative conclusion is that China will account for the largest share of CCT additions over the 1990-2010 period. Both the US and Japan have comparative advantages that might be combined through cooperation and joint ventures to gain a larger share of the evolving CCT market in Asia. 5 refs., 7 figs., 4 tabs

  3. Management of social and economic impacts associated with the construction of large-scale projects: experiences from the Western coal development communities

    Energy Technology Data Exchange (ETDEWEB)

    Greene, M.R.; Curry, M.G.

    1977-06-01

    The construction and operation of large-scale energy or resource development projects are accompanied by environmental, social, and economic changes or impacts. Impact assessment is the key tool used to determine which impact areas will most severely affect the community and will thus need to be managed. Impact management, only recently recognized as part of the assessment process, includes public and private actions to ameliorate impacts. The use of available impact management strategies can affect the outcome or change in the social and economic environment in a community. Therefore, an inventory of available strategies and the capabilities of local governments to use such strategies should be an integral part of any social and economic impact assessment. This provides a link between impact assessment and management. This report provides an introductory analysis to some of the more complex issues raised by social and economic impact management, with experiences cited from Western coal-development communities. Following an introduction, the paper is divided into sections corresponding to the major social and economic impacts experienced by rural communities surrounding an energy development. Each section contains a brief introductory description of the types of problems typically associated with the impact sector, and a discussion of management strategies either proposed or implemented for the impact. The management strategies are presented in tabular form, indicating the level of government responsible for implementation. 10 tables, 72 references. (MCW)

  4. Coal preparation

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The acid rain control legislation has prompted the Department of Energy (DOE) to seek new technology using the Clean Coal Technology program solicitation. The main goal of the program is to reduce SO 2 emissions below 9 Mt/a (10 million stpy) and NO x emission below 5.4 Mt/a (6 million stpy) by the year 2000. This would be accomplished by using precombustion, combustion, post combustion and conversion technology. Utilities are considering installing new scrubbers, switching fuel or possibly deep clean. However, the time required to implement the control technology is short. Due to the legislation, about 110 plants will have to adopt one of the approaches. This paper reports that in characterization of coal, Ames Laboratory used a scanning electron microscope- based, automated image analysis (SEM-AIA) technique to identify coal and mineral matter association. Various forms of organic sulfur were identified using peroxyacetic acid oxidation of coal. This was followed by subsequent microscopic, GC-MS, and HRMS analysis by Southern Illinois University. In ultrafine grinding of coal, it was reported by the Mining and Mineral Institute of Alabama that silica sand or flint shot used less energy compared to steel ball mills

  5. The Impact of Variability of Selected Geological and Mining Parameters on the Value and Risks of Projects in the Hard Coal Mining Industry

    Science.gov (United States)

    Kopacz, Michał

    2017-09-01

    The paper attempts to assess the impact of variability of selected geological (deposit) parameters on the value and risks of projects in the hard coal mining industry. The study was based on simulated discounted cash flow analysis, while the results were verified for three existing bituminous coal seams. The Monte Carlo simulation was based on nonparametric bootstrap method, while correlations between individual deposit parameters were replicated with use of an empirical copula. The calculations take into account the uncertainty towards the parameters of empirical distributions of the deposit variables. The Net Present Value (NPV) and the Internal Rate of Return (IRR) were selected as the main measures of value and risk, respectively. The impact of volatility and correlation of deposit parameters were analyzed in two aspects, by identifying the overall effect of the correlated variability of the parameters and the indywidual impact of the correlation on the NPV and IRR. For this purpose, a differential approach, allowing determining the value of the possible errors in calculation of these measures in numerical terms, has been used. Based on the study it can be concluded that the mean value of the overall effect of the variability does not exceed 11.8% of NPV and 2.4 percentage points of IRR. Neglecting the correlations results in overestimating the NPV and the IRR by up to 4.4%, and 0.4 percentage point respectively. It should be noted, however, that the differences in NPV and IRR values can vary significantly, while their interpretation depends on the likelihood of implementation. Generalizing the obtained results, based on the average values, the maximum value of the risk premium in the given calculation conditions of the "X" deposit, and the correspondingly large datasets (greater than 2500), should not be higher than 2.4 percentage points. The impact of the analyzed geological parameters on the NPV and IRR depends primarily on their co-existence, which can be

  6. Research report of FY 1997 on the clean coal technology promotion project and region model survey. Measures for environmental load reduction: feasibility survey on the environmental load reduction-type utilization Energy Center (interim report); 1997 nendo chosa hokokusho. Clean coal technology suishin jigyo chiiki model chosa `kankyo fuka teigen taisaku: kankyo fuka teigengata sekitan riyo energy center feasibility chosa` chosa hokokusho (chukan hokoku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The survey has given an eye to the coal that it can be easily burnt together with combustible waste and supplements unstable generation of waste. Thus, the establishment of the Energy Center at the place where infrastructure of coal will be arranged, a lot of combustible waste will be expected to generate and a considerable aniybt if energy will be used, has been planned, and this survey is intended to study the scale of Energy Center, its economy and the problems to be solved. In power plant project using RDF for above-mentioned local governments, the construction of power plant and the renewal time of the existing incinerator to RDF facility can be planned separately in this system. The power plant will be economically constructed and the amount of coal can be decreased in accordance with increased RDF to meet wide range of refuse treatment. In FY 1997, the actual situation of the waste treatment and the infrastructure of coal supply was surveyed, and selection of the place suitable for the Energy Center and its scale was studied. 69 figs., 50 tabs.

  7. Self-reliance and innovation of Qinshan phase II NPP project

    International Nuclear Information System (INIS)

    Ye Qizhen; Yang Lanhe

    2007-01-01

    This article mainly describes the self-reliance and innovation of Qinshan nuclear power project of phase II, in-between it contains new reactor core design, as well as related experimental and calculation analysis, especially for new reactor design produced fluid-induced vibration model test, theoretical analysis and testing in-built reactor; aiming at two-loop NSSS a series improvement made for safety systems and related safety analysis to enhance their reliability and redundancy; according to specialty of two-loop NSSS an optimization made for NPP parameters and design of related equipments, for the purpose to make the output of NPP maximal; design of main reactor building and T-G building also improved according to characteristics of two-loop NSSS and site conditions. CRDM and refueling machine are researched and manufactured on base of self-reliance, their performance are better than design requirements, large portion of key equipments are localized through different way. In construction first time realized the integrated erection of containment dome. During the commissioning non-nuclear steam driving of T-G set, as well as 500 kV high voltage rising using emergent diesel generator, etc. are carried out.In period of operation still continuous innovation and improvement are made, so that to keep the good record of operation. (authors)

  8. Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility

    International Nuclear Information System (INIS)

    Queen, R.L.

    1991-06-01

    The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction

  9. Project management of the build of the shore test facility for the prototype of PWR II

    International Nuclear Information System (INIS)

    Clarkson, D.T.

    1987-01-01

    The PWR II is a new design of nuclear steam raising plant for the Royal Navy's submarines. It features improved engineering for safety, increased power, increased shock resistance, reduced noise transmission to sea and reduced manning requirement. It is to be tested in a new prototype testing facility, the Shore Test Facility, which is a section of submarine hull containing a prototype of the nuclear steam raising plant and its support system. It is installed at the Vulcan Naval Reactor Test establishment at Dounreay in Scotland. The function of the establishment is to test new designs of core and reactor plant, validate the mathematical models used in their design, develop improved methods of operation and maintenance of the plant and test new items of equipment. The Shore Test Facility was built in large sections at Barrow-in-Furness and transported to Scotland. The project management for the construction of the Shore Test Facility is explained. It involves personnel from the Royal Navy, and a large number of people working for the contractors involved in the buildings, transportation, operation and maintenance of the Facility. (U.K.)

  10. AIDS incidence and mortality in injecting drug users: the AjUDE-Brasil II Project

    Directory of Open Access Journals (Sweden)

    Cardoso Mauro Nogueira

    2006-01-01

    Full Text Available This paper presents AIDS incidence and mortality among injecting drug users (IDUs reached by the AjUDE-Brasil II Project. From a cross-sectional survey, 478 IDUs were interviewed in three Brazilian cities: Porto Alegre, São José do Rio Preto, and Itajaí. The cohort was followed up in the Brazilian surveillance database for AIDS and mortality during 2000 and 2001. AIDS incidence was 1.1 cases per 100 person-years, and the mortality rate was 2.8 deaths per 100 person-years. AIDS cases only occurred in IDUs who reported ever having shared injecting equipment. Female gender (RR = 5.30, homelessness (RR = 6.16, and report of previous sexual relations with same-sex partners (RR = 6.21 were associated with AIDS. Deaths occurred only among males. Homelessness (RR = 3.00, lack of income (RR = 2.65, HIV seropositive status (RR = 4.52, and no history of incarceration (RR = 3.71 were also associated with death. These findings support evidence that gender and socioeconomic conditions are both determinants of morbidity and mortality in Brazilian IDUs.

  11. Distilling coal

    Energy Technology Data Exchange (ETDEWEB)

    Blythe, F C

    1914-09-14

    In the destructive distillation of bituminous coal, heavy hydrocarbon oil, such as petroleum, kerosine, shale oil, and heavy tar oil, obtained in some cases during the process, is added to the coal, which is then distilled under pressure and at a comparatively low temperature regulated so as to produce a large proportion of hydrocarbon oils and a small proportion of permanent gas. In one method, about 5 to 10 parts of hydrocarbon oil are mixed with 100 parts of crushed or ground coal, and the mixture is heated in a closed vessel, provided in some cases with an agitator, under a pressure of about 60 lb/in/sup 2/, and the temperature may be gradually raised to 350/sup 0/C and then to about 500/sup 0/C. The heating may be by means of superheated steam with or without external heat.

  12. CoalVal-A coal resource valuation program

    Science.gov (United States)

    Rohrbacher, Timothy J.; McIntosh, Gary E.

    2010-01-01

    CoalVal is a menu-driven Windows program that produces cost-of-mining analyses of mine-modeled coal resources. Geological modeling of the coal beds and some degree of mine planning, from basic prefeasibility to advanced, must already have been performed before this program can be used. United States Geological Survey mine planning is done from a very basic, prefeasibility standpoint, but the accuracy of CoalVal's output is a reflection of the accuracy of the data entered, both for mine costs and mine planning. The mining cost analysis is done by using mine cost models designed for the commonly employed, surface and underground mining methods utilized in the United States. CoalVal requires a Microsoft Windows? 98 or Windows? XP operating system and a minimum of 1 gigabyte of random access memory to perform operations. It will not operate on Microsoft Vista?, Windows? 7, or Macintosh? operating systems. The program will summarize the evaluation of an unlimited number of coal seams, haulage zones, tax entities, or other area delineations for a given coal property, coalfield, or basin. When the reader opens the CoalVal publication from the USGS website, options are provided to download the CoalVal publication manual and the CoalVal Program. The CoalVal report is divided into five specific areas relevant to the development and use of the CoalVal program: 1. Introduction to CoalVal Assumptions and Concepts. 2. Mine Model Assumption Details (appendix A). 3. CoalVal Project Tutorial (appendix B). 4. Program Description (appendix C). 5. Mine Model and Discounted Cash Flow Formulas (appendix D). The tutorial explains how to enter coal resource and quality data by mining method; program default values for production, operating, and cost variables; and ones own operating and cost variables into the program. Generated summary reports list the volume of resource in short tons available for mining, recoverable short tons by mining method; the seam or property being mined

  13. Report on the final evaluation on the 'development of a bituminous coal liquefaction technology (NEDOL method)' in the Sunshine Project; Rekiseitan ekika gijutsu (NEDOL ho) kaihatsu saishu hyoka hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-01

    Development of a bituminous coal liquefaction technology (NEDOL method) can be judged appropriate as a national project in the comprehensive view with the 21st century just around the corner. It is a fact that this project has spent the national budget not in a small amount. There is no prospect of the technology to be put into practical use in Japan at the present time. The coal liquefaction technology is a technology required inevitably in the situation where shortage of crude oil supply may endanger the existence of a nation. Therefore, there is sufficient significance in having demonstrated the effectiveness of the NEDOL method which can be applied to a large number of coal types and expected of high liquefaction yield. The contents of the 'technological package' to be prepared are so demanded that its usefulness can be retained until the time of a demonstration plant design and operation will come in the future. It is also desired that the human resources and the testing devices will be kept ensured, and the technologies developed under this project will be maintained and expanded. The present technology has low necessity of immediately putting into practical use in Japan at the present time. However, the technology should be kept available for use at any time, and retained for use in an urgent situation. (NEDO)

  14. Tasks in development of the USSR coal industry

    Energy Technology Data Exchange (ETDEWEB)

    Bratchenko, B F

    1981-08-01

    Minister of the Soviet coal industry evaluates social and economic development plan of the Soviet coal industry from 1981 to 1985. Planned coal production should increase to 770-800 Mt, exceeding coal production in 1980 by 53 to 83 Mt. Proportion of coal mined by surface methods will further increase. Investment program concentrates on: construction of the Kansk-Achinsk fuel and energy basin, construction of the South Yakut coal basin and further development of surface mines in the Ehkibastuz basin. Proportion of coal mined in the Kuzbass will increase to 45% of the total coal output. Construction of the Kansk-Achinsk basin has the highest priority among the investment projects. Investment projects (construction of new coal mines and modernization of existing mines) in major coal basins in 1981 are analyzed. Mining machines and equipment for underground and surface black and brown coal mining are evaluated. Plans for developing new mining systems are described (e.g. narrow web coal cutter with chainless haulage system for thin and medium coal seams with drive system with power ranging from 110 to 315 kW). The following types of machines are discussed: coal cutters, shearer loaders, heading machines, belt conveyors, loaders. Selected social problems associated with manpower shortages for underground mining and for coal mines operating under extreme climatic conditions are also discussed.

  15. Thermal-Mechanical Study of 3.9 GHz CW Coupler and Cavity for LCLS-II Project

    Energy Technology Data Exchange (ETDEWEB)

    Gonin, Ivan [Fermilab; Harms, Elvin [Fermilab; Khabiboulline, Timergali [Fermilab; Solyak, Nikolay [Fermilab; Yakovlev, Vyacheslav [Fermilab

    2017-05-01

    Third harmonic system was originally developed by Fermilab for FLASH facility at DESY and then was adopted and modified by INFN for the XFEL project [1-3]. In contrast to XFEL project, all cryomodules in LCLS-II project will operate in CW regime with higher RF average power for 1.3 GHz and 3.9 GHz cavities and couplers. Design of the cavity and fundamental power coupler has been modified to satisfy LCLS-II requirements. In this paper we discuss the results of COMSOL thermal and mechanical analysis of the 3.9 GHz coupler and cavity to verify proposed modifica-tion of the design. For the dressed cavity we present simulations of Lorentz force detuning, helium pressure sensitivity df/dP and major mechanical resonances.

  16. Fiscal 1975 Sunshine Project. Technology assessment on coal gasification and liquefaction; 1975 nendo sekitan no gas ka ekika gijutsu no technology assessment seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-03-31

    This research was intended to find the desirable direction of technological development, by discussing the effects of coal gasification/liquefaction technologies from every angle, for the purpose coping with the social demand for steadily and continuously obtaining clean energy. This year, the examination was conducted not only on the energy conversion technologies of coal gasification/liquefaction, but also on the impact generating from the entire supply system of coal energy from coal mine development to mining, transportation, storage and conversion to secondary energy. For this purpose, while the outline was grasped of coal resources in the world as well as each technology for the mining, transportation, storage, electric power generation by gasification, and high calorie gasification, a case study was made on the assumption that electric power generation and high calorie gasification were conducted by importing 1,000 tons of coal from overseas, extracting the impact on the basis of this case study. In addition, examination was made on the position of coal energy in the energy supply of the future, with an impact investigated on condition that about 300 million tons were imported equivalent to roughly 16% of energy supply in the year 2000 or about. (NEDO)

  17. RETROFIT COSTS FOR SO2 AND NOX CONTROL OPTIONS AT 200 COAL-FIRED PLANTS, VOLUME II - SITE SPECIFIC STUDIES FOR AL, DE. FL, GA, IL

    Science.gov (United States)

    The report gives results of a study, the objective of which was to significantly improve engineering cost estimates currently being used to evaluate the economic effects of applying SO2 and NOx controls at 200 large SO2-emitting coal-fired utility plants. To accomplish the object...

  18. Report on the Sunshine Project in fiscal 1990. Studies on liquefaction characteristics by coal types and on engineering properties; 1990 nendo tanshu ni yoru ekika tokusei to kogakuteki busseichi ni kansuru kenkyu hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-07-01

    This paper describes the achievements at the Government Industrial Development Laboratory, Hokkaido in the Sunshine Project in fiscal 1990. Surveys were carried on different catalytic activities for co-liquefaction of various types of coals. The Ru system was found preferable in acquiring fatty family products of low boiling points. Reactions of co-liquefaction constituents do not progress independently, but have positive interaction. Adding Ru is effective in accelerating hydrogenation of condensed aromatic rings and hydrogenation of cleaving nucleus, but in view of the hydrogenating decomposition capability, the Mo-system may be better. In a liquefaction plant test, diesel oil was manufactured by reforming and improving the Yallourn coal light oil. However, the oxygen content was too high, aggravating the temperature distribution control in catalyst bed, and not having achieved the intended denitrification rate. Discussions were given on co-liquefaction of the depressurization residues of Cold Lake (CLVB[vacuum bottom])/Athabasca (ATVB) and Battle River coal. The CLCVB and ATVB were turned into lower molecules easily through hydrogenation treatment. The reaction characteristics reflected the characteristics of medium oil. Depolymerization of coal has progressed faster in ATVB. In the study on the engineering property values, discussions were given on behavior of solid particles in a bubble column, and gas hold-up of slurry. (NEDO)

  19. Report on the research achievements in the Sunshine Project in fiscal 1990. Studies on coal liquefying reaction, and reforming and utilization of the products; 1990 nendo sekitan no ekika hanno to seiseibutsu no kaishitsu riyo no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-03-01

    This paper describes the achievements in the Sunshine Project in fiscal 1990 on research of coal liquefying reaction. The research contributes to developing a coal liquefaction technology as one of the methods for manufacturing clean energy and chemical raw materials from coal. In the fundamental study on the liquefaction, primarily liquefied heavy constituents in different types of coals were divided into such constituents as HI, TI, and THFI to discuss the performance and coking behavior of each constituent as solvent. Furthermore, effects of hydrogenation treatment were also elucidated. Decomposing reaction was performed on different heavy products to discuss effects of the reaction conditions. In the liquefying reaction using petroleum-based heavy oil as solvent, different shale oils were used in experiments for comparison with the case of using tar sand bitumen. In the study of reforming the product, comparison was carried out on reactions in hydrogenation treatment and contact decomposition of medium to heavy fractions of liquefied oil. A separation experiment was made on hetero compounds by means of solvent extraction and pressure crystallization of liquefied oil naphtha and light oil fraction. Effects of additive were investigated in an engine test on the stabilized and balanced light oil fraction. Discussions were given on high level utilization of heat treated oil recovered from residues in liquefaction distillation. (NEDO)

  20. FY 2000 report on the project for promotion of clean coal technology. Survey of zero emission coal technology; 2000 nendo clean coru technology suishin jigyo. Zero emission coru technology chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The paper surveyed a plan on the zero emission coal technology including up to CO2 fixation which is proposed in the U.S. and the present situation of the related study, and studied the viability of this plan including the R and D similar to this plan in Japan. Los Alamos National Laboratory in the U.S. thought of a concept of the technology to produce hydrogen from coal and recover CO2 at the same time for underground fixation, and is proceeding with the practical application. The process does not need oxygen, combustion, nor heating to be newly made. What is needed except coal is only water and lime, both of which can be recycled. The process, which discharges nothing into the air, is a closed cycle. The HyPr-RING process in Japan is a technology to decompose coal in high temperature (about 650 degrees C)/high pressure (100-200 atm) water for hydrogen formation, absorbing the formed CO2 by CaO, etc. Both of the processes have the problem, but it is necessary to make information exchanges since Japan and the U.S. devised the process at the same time. (NEDO)

  1. Techno-Economic Analysis of Scalable Coal-Based Fuel Cells

    Energy Technology Data Exchange (ETDEWEB)

    Chuang, Steven S. C. [Univ. of Akron, OH (United States)

    2014-08-31

    Researchers at The University of Akron (UA) have demonstrated the technical feasibility of a laboratory coal fuel cell that can economically convert high sulfur coal into electricity with near zero negative environmental impact. Scaling up this coal fuel cell technology to the megawatt scale for the nation’s electric power supply requires two key elements: (i) developing the manufacturing technology for the components of the coal-based fuel cell, and (ii) long term testing of a kW scale fuel cell pilot plant. This project was expected to develop a scalable coal fuel cell manufacturing process through testing, demonstrating the feasibility of building a large-scale coal fuel cell power plant. We have developed a reproducible tape casting technique for the mass production of the planner fuel cells. Low cost interconnect and cathode current collector material was identified and current collection was improved. In addition, this study has demonstrated that electrochemical oxidation of carbon can take place on the Ni anode surface and the CO and CO2 product produced can further react with carbon to initiate the secondary reactions. One important secondary reaction is the reaction of carbon with CO2 to produce CO. We found CO and carbon can be electrochemically oxidized simultaneously inside of the anode porous structure and on the surface of anode for producing electricity. Since CH4 produced from coal during high temperature injection of coal into the anode chamber can cause severe deactivation of Ni-anode, we have studied how CH4 can interact with CO2 to produce in the anode chamber. CO produced was found able to inhibit coking and allow the rate of anode deactivation to be decreased. An injection system was developed to inject the solid carbon and coal fuels without bringing air into the anode chamber. Five planner fuel cells connected in a series configuration and tested. Extensive studies on the planner fuels

  2. Coal liquefaction process streams characterization and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1992-03-01

    CONSOL R D is conducting a three-year program to characterize process and product streams from direct coal liquefaction process development projects. The program objectives are two-fold: (1) to obtain and provide appropriate samples of coal liquids for the evaluation of analytical methodology, and (2) to support ongoing DOE-sponsored coal liquefaction process development efforts. The two broad objectives have considerable overlap and together serve to provide a bridge between process development and analytical chemistry.

  3. Clean coal technology. Coal utilisation by-products

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-08-15

    The need to remove the bulk of ash contained in flue gas from coal-fired power plants coupled with increasingly strict environmental regulations in the USA result in increased generation of solid materials referred to as coal utilisation by-products, or CUBs. More than 40% of CUBs were sold or reused in the USA in 2004 compared to less than 25% in 1996. A goal of 50% utilization has been established for 2010. The American Coal Ash Association (ACCA) together with the US Department of Energy's Power Plant Improvement Initiative (PPPI) and Clean Coal Power Initiative (CCPI) sponsor a number of projects that promote CUB utilization. Several are mentioned in this report. Report sections are: Executive summary; Introduction; Where do CUBs come from?; Market analysis; DOE-sponsored CUB demonstrations; Examples of best-practice utilization of CUB materials; Factors limiting the use of CUBs; and Conclusions. 14 refs., 1 fig., 5 tabs., 14 photos.

  4. Horonobe Underground Research Laboratory project. Synthesis of phase II (construction phase) investigations to a depth of 350 m

    International Nuclear Information System (INIS)

    Sato, Toshinori; Sasamoto, Hiroshi; Ishii, Eiichi; Matsuoka, Toshiyuki; Hayano, Akira; Miyakawa, Kazuya; Fujita, Tomoo; Tanai, Kenji; Nakayama, Masashi; Takeda, Masaki; Yokota, Hideharu; Aoyagi, Kazuhei; Ohno, Hirokazu; Shigeta, Naotaka; Hanamuro, Takahiro; Ito, Hiroaki

    2017-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. This report summarizes the results of the Phase II investigations carried out from April 2005 to June 2014 to a depth of 350 m. Integration of work from different disciplines into a 'geosynthesis' ensures that the Phase II goals have been successfully achieved and identifies key issues that need to be addressed in the Phase II investigations. Efforts are made to summarize as many lessons learnt from the Phase II investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. (author)

  5. Absorptive capacity, knowledge circulation and coal cleaning innovation : the Netherlands in the 1930s

    NARCIS (Netherlands)

    Davids, M.; Tjong Tjin Tai, S.E.

    2009-01-01

    Before World War II, Dutch State Mines, the national, state owned coal corporation, was confronted with major challenges, specifically that foreign coal was sold at dumping prices in the home market. At the same time, coal cleaning needed to be improved in order to offer higher quality coal against

  6. Possibility of chemical products from coal

    Energy Technology Data Exchange (ETDEWEB)

    Harris, G A; Sinnett, C E; Swift, H E

    1982-01-01

    An account of the SRC-II plant, which produces solvent refined coal (SRC), a liquid product. SRC is a raw material with potential as a new source of hydrocarbons. Topics discussed include the possibilities of its use as a petrochemical feedstock; derivatives and the amounts obtained; economic assessments and expected prices. The translator of this article puts forward the view that, due to the difficulty of obtaining the type of coal needed for SRC-II, the best policy for Japanese coal liquefaction is methanol synthesis.

  7. Coal Bed Methane Primer

    Energy Technology Data Exchange (ETDEWEB)

    Dan Arthur; Bruce Langhus; Jon Seekins

    2005-05-25

    During the second half of the 1990's Coal Bed Methane (CBM) production increased dramatically nationwide to represent a significant new source of income and natural gas for many independent and established producers. Matching these soaring production rates during this period was a heightened public awareness of environmental concerns. These concerns left unexplained and under-addressed have created a significant growth in public involvement generating literally thousands of unfocused project comments for various regional NEPA efforts resulting in the delayed development of public and fee lands. The accelerating interest in CBM development coupled to the growth in public involvement has prompted the conceptualization of this project for the development of a CBM Primer. The Primer is designed to serve as a summary document, which introduces and encapsulates information pertinent to the development of Coal Bed Methane (CBM), including focused discussions of coal deposits, methane as a natural formed gas, split mineral estates, development techniques, operational issues, producing methods, applicable regulatory frameworks, land and resource management, mitigation measures, preparation of project plans, data availability, Indian Trust issues and relevant environmental technologies. An important aspect of gaining access to federal, state, tribal, or fee lands involves education of a broad array of stakeholders, including land and mineral owners, regulators, conservationists, tribal governments, special interest groups, and numerous others that could be impacted by the development of coal bed methane. Perhaps the most crucial aspect of successfully developing CBM resources is stakeholder education. Currently, an inconsistent picture of CBM exists. There is a significant lack of understanding on the parts of nearly all stakeholders, including industry, government, special interest groups, and land owners. It is envisioned the Primer would being used by a variety of

  8. Chinese coal supply and future production outlooks

    International Nuclear Information System (INIS)

    Wang, Jianliang; Feng, Lianyong; Davidsson, Simon; Höök, Mikael

    2013-01-01

    China's energy supply is dominated by coal, making projections of future coal production in China important. Recent forecasts suggest that Chinese coal production may reach a peak in 2010–2039 but with widely differing peak production levels. The estimated URR (ultimately recoverable resources) influence these projections significantly, however, widely different URR-values were used due to poor understanding of the various Chinese coal classification schemes. To mitigate these shortcomings, a comprehensive investigation of this system and an analysis of the historical evaluation of resources and reporting issues are performed. A more plausible URR is derived, which indicates that many analysts underestimate volumes available for exploitation. Projections based on the updated URR using a modified curve-fitting model indicate that Chinese coal production could peak as early as 2024 at a maximum annual production of 4.1 Gt. By considering other potential constraints, it can be concluded that peak coal in China appears inevitable and immediate. This event can be expected to have significant impact on the Chinese economy, energy strategies and GHG (greenhouse gas) emissions reduction strategies. - Highlights: • Review of Chinese coal geology and resources/reserves. • Presentation of the Chinese coal classification system. • Forecasting future Chinese coal production using Hubbert curves. • Critical comparison with other forecasts. • Discussions transportation, environmental impact, water consumption, etc

  9. Prospects For Coal And Clean Coal Technologies In Kazakhstan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-12-15

    The coal sector in Kazakhstan is said to have enough reserves to last over 100 years, but the forecasted reserves are expected to last several hundreds of years. This makes investing in the fuel and energy sector of the country an attractive option for many international and private organisations. The proven on-shore reserves will ensure extraction for over 30 years for oil and 75 years for gas. The future development of the domestic oil sector depends mainly on developing the Kazakh sector of the Caspian Sea. The coal sector, while not a top priority for the Kazakh government, puts the country among the world's top ten coal-rich countries. Kazakhstan contains Central Asia's largest recoverable coal reserves. In future, the development of the raw materials base will be achieved through enriching and improving the quality of the coal and the deep processing of coal to obtain fluid fuel and synthetic substances. Developing shale is also topical. The high concentration of methane in coal layers makes it possible to extract it and utilise it on a large scale. However, today the country's energy sector, which was largely established in the Soviet times, has reached its potential. Kazakhstan has about 18 GW of installed electricity capacity, of which about 80% is coal fired, most of it built before 1990. Being alert to the impending problems, the government is planning to undertake large-scale modernisation of the existing facilities and construct new ones during 2015-30. The project to modernise the national electricity grid aims to upgrade the power substations to ensure energy efficiency and security of operation. The project will result in installation of modern high-voltage equipment, automation and relay protection facilities, a dispatch control system, monitoring and data processing and energy management systems, automated electricity metering system, as well as a digital corporate telecommunication network.

  10. FY 2000 report on the basic survey to promote Joint Implementation, etc. Project on methane gas recovery use in the Donetsk coal field/coal mine; 2000 nendo kyodo jisshi nado suishin kiso chosa hokokusho. Donetsk tanden tanko methane gas kaishu riyo keikaku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of getting petroleum substitution energy and reducing greenhouse effect gas emission, an investigational study was carried out of the project for methane gas recovery/utilization at the Donbassa coal mine in Ukraine. At the Donbassa coal mine, degassing by test boring is being conducted to reduce the gas emission at coal face for safety, but most of the gas is discharged into the air. In this project, the following were studied: degassing boring/gas induction from bore hole/measurement in gas induction pipe, gas recovery system combined with gas induction in flyash, and installation/operation of gas engine power generation facilities (1,710kW x 7 units) with exhaust heat recovery boiler using the recovered methane gas as fuel. The results obtained were the petroleum substitution amount of 31,000 toe/y and the amount of greenhouse effect gas reduction of 480,000 t/y. In the economical estimation, the initial investment amount was 3 billion yen, the profitability of the total investment used was 2.9%, and the internal earning rate was 6.5%. (NEDO)

  11. PENGEMBANGAN ASESMEN ALTERNATIF PRAKTIKUM KIMIA DASAR II MELALUI CHEMISTRY FAIR PROJECT (CFP BERBASIS KONSERVASI DENGAN MEMANFAATKAN DAILY CHEMICAL

    Directory of Open Access Journals (Sweden)

    Indah Urwatin Wusqo

    2016-12-01

    Full Text Available Penelitian ini bertujuan untuk (1 Mengembangkan asesmen alternatif pada praktikum kimia dasar II melalui chemistry fair project berbasis konservasi dengan memanfaatkan daily chemical(2 Mengetahui tingkat kevalidan, kepraktisan dan keefektifannya. Penelitian ini merupakan penelitian pengembangan (Development Research Model pengembangan yang diterapkan Dick dan Carey (1985. Subjek uji coba terbatas maupun subjek uji coba lapangan adalah dosen dan mahasiswa Prodi Pendidikan IPA UNNES. Sampel ditentukan secara purposive, yaitu dosen pengampu dan mahasiswa yang menempuh mata kuliah Praktikum Kimia Dasar II. Data yang diperoleh dari uji coba ini adalah: (1 masukan dari pakar, untuk menentukan validitas isi dan konstruk dari fitur asesmen; (2 masukan dari sampel uji coba terbatas, untuk menentukan kepraktisan petunjuk chemistry fair project (CFP berbasis konservasi dengan memanfaatkan daily chemical ; Instrumen pengumpul data berupa angket keterbacaan petunjuk pembuatan chemistry fair project (CFP berbasis konservasi dengan memanfaatkan daily chemical, pedoman penskoran. (3 data hasil belajar siswa untuk mengetahui efektivitas asesmen. Masukan dari pakar angket mahasiswa, dan nilai chemistry fair project (CFP sampel ujicoba terbatas dianalisis secara kualitatif, dan kuantitatif. Asesmen alternative Praktikum Kimia Dasar II yang dikembangkan dikatakan berhasil baik apabila asesmen yang dikembangkan valid, praktis, dan efektif.

  12. Coal pillar design procedures

    CSIR Research Space (South Africa)

    York, G

    2000-03-01

    Full Text Available Final Project Report Coal pillar design procedures G. York, I. Canbulat, B.W. Jack Research agency: CSIR Mining Technology Project number: COL 337 Date: March 2000 2 Executive Summary Examination of collapsed pillar cases outside of the empirical... in strength occurs with increasing specimen size. 45 40 35 30 25 20 15 10 5 0 20 40 60 80 100 120 140 160 UNIAX IA L COMPR EHEN SIV E S TR ENG TH (M Pa ) CUBE SIZE (cm) Figure 1...

  13. World War II, The CANOL project and the Marwell Tar Pit: a case study

    International Nuclear Information System (INIS)

    Dobrowolsky, H.

    2000-01-01

    The CANOL project was a joint U.S.-Canada undertaking during World War II. It entailed the construction of a road and pipeline from the oil fields of Norman Wells on the Mackenzie River, 960 kms over the Mackenzie Mountains to a new refinery at Whitehorse. The goal was to provide a secure supply of aviation fuel far from the menace of Japanese bombers. Initially, the pipeline was expected to operate by October 1942. In actual fact, the first gasoline was not produced in the crude distillation unit until April 24, 1944, and it was not until November 1944 that the refinery finally began producing aviation fuel. Four months later, the pipeline and the refinery were shut down. The project cost American taxpayers $ 134 million. A total of 2650 kms of pipeline was laid. During the first nine months of pipeline operation 46,000 barrels of oil was spilled, much of it directly into the Mackenzie River. Total production from the refinery, which itself cost $ 27 million, wa 866,670 barrels of products. When the refinery was shut down, most of the refinery structures were dismantled and moved, via the Alaska Highway, to the newly discovered Leduc oilfields, but buildings, tanks and hydrocarbon waste were left behind. In a 1960 report it was estimated that some four million litres of oil has been pumped into a pit located within the containment berm formerly surrounding an 80,000 barrel oil storage tank which was dismantled after the shutdown. The bureaucratic dispute about who is responsible for cleaning up has been an issue ever since. The cost of cleanup was estimated at about $ 4 million in 1994. Since the federal government, the original owners of the land , transferred the land to provincial jurisdiction in 1970, it disclaimed any responsibility for site cleanup, however, there has been some recent evidence of willingness on the part of the Department of National Defence and the Department of Indian and Northern Affairs to determine proper actions to clean up the site

  14. Development and field evaluation of animal feed supplementation packages (AFRA project II-17 - RAF/5/041). Project summary

    International Nuclear Information System (INIS)

    Makkar, H.P.S.

    2002-01-01

    The Joint FAO/IAEA programme has supported animal production research in Africa for many years through country Technical Co-operation (TC) Projects, Regional Projects (AFRA) and Co-ordinated Research Project (CRP). These activities have helped to build up the infrastructure needed in the countries concerned to conduct much of the research in animal reproduction and nutrition. In the past the Agency has provided technical assistance in defining reproductive indices of ruminant livestock species and identifying nutritional constraints to productivity of animals maintained on smallholder farms under various topographical and environmental conditions. In view of the satisfactory progress of AFRA Project VIII in identifying the major constraints to livestock productivity in the region, and the recognition of many Member States of the importance of supplementary feeding for improving milk and meat production, a regional strategy was proposed for developing affordable and sustainable supplementation packages for improving productivity from smallholder farms using locally available feed resources. The new Regional Project was initiated in 1997 with the following objectives: 1. To produce a supplementary feed in the form of a convenient and easy-to-use package for improving milk and meat production in peri-urban areas 2. To promote the uptake of this technology through demonstrations of its advantages in terms of increased productivity and benefit: cost ratio 3. To maximize the use of locally available feed material such as molasses, cereal bran, legume tree leaves, oil seed meals, etc. for feeding ruminant livestock, thereby reducing the use of high cost concentrate feeds 4. To promote technical co-operation amongst developing countries (TCDC) in the region and take advantage of established infrastructure and available human and technical resources to solve problems of common interest. From 1997 until 2000 the project has been operational with 13 Member States

  15. Oxy-coal Combustion Studies

    Energy Technology Data Exchange (ETDEWEB)

    Wendt, J. [Univ. of Utah, Salt Lake City, UT (United States); Eddings, E. [Univ. of Utah, Salt Lake City, UT (United States); Lighty, J. [Univ. of Utah, Salt Lake City, UT (United States); Ring, T. [Univ. of Utah, Salt Lake City, UT (United States); Smith, P. [Univ. of Utah, Salt Lake City, UT (United States); Thornock, J. [Univ. of Utah, Salt Lake City, UT (United States); Y Jia, W. Morris [Univ. of Utah, Salt Lake City, UT (United States); Pedel, J. [Univ. of Utah, Salt Lake City, UT (United States); Rezeai, D. [Univ. of Utah, Salt Lake City, UT (United States); Wang, L. [Univ. of Utah, Salt Lake City, UT (United States); Zhang, J. [Univ. of Utah, Salt Lake City, UT (United States); Kelly, K. [Univ. of Utah, Salt Lake City, UT (United States)

    2012-01-06

    The objective of this project is to move toward the development of a predictive capability with quantified uncertainty bounds for pilot-scale, single-burner, oxy-coal operation. This validation research brings together multi-scale experimental measurements and computer simulations. The combination of simulation development and validation experiments is designed to lead to predictive tools for the performance of existing air fired pulverized coal boilers that have been retrofitted to various oxy-firing configurations. In addition, this report also describes novel research results related to oxy-combustion in circulating fluidized beds. For pulverized coal combustion configurations, particular attention is focused on the effect of oxy-firing on ignition and coal-flame stability, and on the subsequent partitioning mechanisms of the ash aerosol.

  16. Coal Mines Security System

    OpenAIRE

    Ankita Guhe; Shruti Deshmukh; Bhagyashree Borekar; Apoorva Kailaswar; Milind E.Rane

    2012-01-01

    Geological circumstances of mine seem to be extremely complicated and there are many hidden troubles. Coal is wrongly lifted by the musclemen from coal stocks, coal washeries, coal transfer and loading points and also in the transport routes by malfunctioning the weighing of trucks. CIL —Coal India Ltd is under the control of mafia and a large number of irregularities can be contributed to coal mafia. An Intelligent Coal Mine Security System using data acquisition method utilizes sensor, auto...

  17. Coal at the crossroads

    International Nuclear Information System (INIS)

    Scaroni, A.W.; Davis, A.; Schobert, H.; Gordon, R.L.; Ramani, R.V.; Frantz, R.L.

    1992-01-01

    Worldwide coal reserves are very large but coal suffers from an image of being an environmentally unfriendly and inconvenient fuel. Aspects discussed in the article include: coal's poor image; techniques for coal analysis, in particular instrumented techniques; developments in clean coal technology e.g. coal liquefaction, fluidized bed combustion, co-generation and fuel slurries; the environmental impact of mining and land reclamation; and health aspects. It is considered that coal's future depends on overcoming its poor image. 6 photos

  18. Investigation cost subsidizing project for improving development of overseas coals in fiscal 1999. Investigations on improving development of Asian and Pacific coals (Investigation on production expansion of high quality coal in Shanxi Province, China); 1999 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Chugoku Shanxi sho ni okeru kohin'itan no seisan kakudai ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Evaluation was given on improvement measures to enhance quality of coal in Shanxi Province in China (Datong coal), which is exported to Japan in a large quantity. Quality problems in the Datong coal are mixture of foreign materials and quality level variation. In spite of the demands from the Japanese side, no large progress has been made in the past decade. As a result of discussions, the following improvement measures were enumerated: review on works at blast boring facings, more thorough cleaning of freight cars at the mines, exhaustive separation and recovery of plus 50 mm in coal dressing, completely mechanized boring, dressing treatment on coals purchased from other mines, whole grain size dressing treatment, establishment of the sales system of one mine selling one kind of coal, use of dedicated freight cars for Datong coal for export in railway transportation, assurance of dedicated coal storage yards in embarking ports, and improvement in the blending system at embarking ports. Understanding on quality control by highest executives at the Datong Mining Bureau and managers of each mine has been considerably deepened through the present investigation having been done over two fiscal years. As a result, the quality control mechanism was structured, the whole grain size dressing is performed, simplified dressing facilities were newly installed, and magnet separators were installed additionally. (NEDO)

  19. Investigation cost subsidizing project for improving development of overseas coals in fiscal 1999. Investigations on improving development of Asian and Pacific coals (Investigation on optimizing the coal transportation system in East Karimantan Province in Indonesia); 1999 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Indonesia Higashi Karimantan shu ni okeru sekitan yuso system saitekika chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Evaluation was given on coal production quantity and coal transportation capability in areas scheduled of future development in Karimantan, Indonesia. Discussions were given on an optimal coal transportation system in East Karimantan Province. The coal production quantity in East Karimantan in fiscal 1999 was 35.27 million tons, accounting for 48% of the total Indonesian coal production. Production of 81.90 million tons is anticipated in 2020. Quality of the coal being produced is low in ash and high in water content in general. Calorific power is 5800 kcal or more. Sulfur content is 0.5% or more, not necessarily a low sulfur coal. The result of analyzing the optimal transportation routes by using the LP model may be summarized as follows: such scenarios are regarded to be largely profitable and advantageous that assume making railways utilizable as the land transportation in addition to use of trucks, belt conveyers, and barges, expanding coal terminals at the ports of PBCT, KPC, BCT and NPLCT, and newly building ports at Tarakan, TgSengatta, BPCTH, and Mangkapadie. (NEDO)

  20. The mechanism of coking pressure generation II: Effect of high volatile matter coking coal, semi-anthracite and coke breeze on coking pressure and contraction

    Energy Technology Data Exchange (ETDEWEB)

    Merrick Mahoney; Seiji Nomura; Koichi Fukuda; Kenji Kato; Anthony Le Bas; David R. Jenkins; Sid McGuire [BHP Billiton Technology, Shortland, NSW (Australia)

    2010-07-15

    One of the most important aspects of the cokemaking process is to control and limit the coking pressure since excessive coking pressure can lead to operational problems and oven wall damage. Following on from a previous paper on plastic layer permeability we have studied the effect of contraction of semi-coke on coking pressure and the effect of organic additives on contraction. A link between contraction (or simulated contraction) outside the plastic layer and coking pressure was demonstrated. The interaction between this contraction, local bulk density around the plastic layer and the dependence of the permeability of the plastic layer on bulk density was discussed as possible mechanisms for the generation of coking pressure. The effect of blending either a high volatile matter coal or one of two semi-anthracites with low volatile matter, high coking pressure coals on the coking pressure of the binary blends has been explained using this mechanism. 25 refs., 10 figs., 4 tabs.

  1. Financing of coal development in the PRC

    Energy Technology Data Exchange (ETDEWEB)

    Schofield, B J

    1984-01-01

    The financing of individual coal development projects in China is discussed. External finance can be raised from various sources including international and national aid institutions together with export credit agencies and commercial banks, or by means of a compensation trade agreement whereby the value of the coal produced meets the cost of equipment, etc.

  2. Reassessment of coal pillar design procedure

    CSIR Research Space (South Africa)

    Madden, BJ

    1995-12-01

    Full Text Available The SIMRAC project COL 021A entitled “a reassessment of coal pillar design procedures” set out to achieve a coal pillar design procedure that takes cognisance of different geological and structural factors as well as the influence...

  3. Report on the achievements in the Sunshine Project in fiscal 1986. Coal energy (Studies on coal liquefying catalysts and a liquefied oil analyzing method); 1986 nendo sekitan ekikayo shokubai oyobi ekikayu bunsekiho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    The present studies are intended to study catalysts that make manufacture of liquid fuel possible through coal liquefying reactions, and establish a liquefied oil analyzing method. The following items are discussed based on the achievements obtained by fiscal 1985: in the studies on coal liquefying catalysts, (1) a study on selectively liquefying catalysts, in which elucidation is made on effects of catalyst carriers on reaction selectivity and life of coal liquefying catalysts, and fundamental data are accumulated toward designing the catalysts with respect to catalyst carriers capable of selective hydrogenating reactions, and to carrying conditions; and (2) a study on solvent properties and reaction conditions. in which Mo-based catalysts are used to perform kinetic discussions on the relationship between the liquefying reaction conditions and compositions of solvents and produced oil to accumulate data for elucidating the action mechanisms of the Mo-based catalysts. In the study of the liquefied oil analyzing method, discussions are carried out on a measuring technology to expand the conventional method for liquefied oil analysis to hard-to-volatilize components. For the light and medium oils, an analyzing method will be established that utilizes effectively the NMR method and the MS method that have been established to date. (NEDO)

  4. Engineer exchanging project on coal mine technology field in fiscal 1999. International information exchanging project (the overseas workshop in Vietnam); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Vietnam)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Technical information exchange was performed with Vietnamese engineers related to coal mine technologies through the overseas workshop and the technical tour. At the same time, investigations were executed on the production technology levels and needs in Vietnam, and on possibilities of transfer of Japanese technologies. The 'Overseas workshop (Vietnam)' was held on September 28, 1999 with the 'trends and problems in coal production technologies' as the main theme. Lectures were given in the session related to coal production technologies by Vietnamese coal technology experts, each from VINACOAL and IMSAT, and by two Japanese coal technology experts. A comprehensive discussion was also executed, and items of technical information were exchanged on the coal production technologies. The number of persons actually participated in the workshop counted 58, with the proceedings presented by them distributed. The Mao Khe and Duong Huy coal mines in Quang Ninh Province were visited as the technical tour, whereas the coal mine sites were inspected and opinions were exchanged with the site engineers. Gas analysis was performed in the Mao Khe mine from the viewpoint of a gas control technology, and site investigation was carried out on lock bolts in the Duong Huy mine from the viewpoint of a roof control technology. (NEDO)

  5. Coal in Asia-Pacific. Vo.9 No.2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This article includes `JAPAC International Symposium: Coal Flow 1997,` `Study to consolidate infrastructure to import overseas coal,` and `China`s coal-fired thermal power development plans and Japan`s subjects.` The theme of Coal Flow 1997 was `The supply and demand of coal up to 2020 - Its outlook and related issues.` The main subject for discussion was `a review of the long-term outlook for coal supply and demand from now into the year 2020 in coal producing and consuming members of the Asia-Pacific community, of which economic growth rate is expected to continue.` For the study to consolidate infrastructure to import overseas coal, subjects for stable Australian coal supply under environmental constraints are outlined. Coal resources and reserves in Australia, Australia`s coal supply capabilities, and export markets for Australian coal and its supply capabilities to Japan are discussed. For China`s coal-fired thermal power development plans and Japan`s subjects, subjects of coal-fired thermal power, coal-fired thermal power development plans and foreign-funded projects, and Japan`s cooperation and subjects are outlined. 26 figs., 26 tabs.

  6. Coal industry annual 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    Coal Industry Annual 1997 provides comprehensive information about US coal production, number of mines, prices, productivity, employment, productive capacity, and recoverable reserves. US Coal production for 1997 and previous years is based on the annual survey EIA-7A, Coal Production Report. This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report includes a national total coal consumption for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. 14 figs., 145 tabs.

  7. Coal industry annual 1997

    International Nuclear Information System (INIS)

    1998-12-01

    Coal Industry Annual 1997 provides comprehensive information about US coal production, number of mines, prices, productivity, employment, productive capacity, and recoverable reserves. US Coal production for 1997 and previous years is based on the annual survey EIA-7A, Coal Production Report. This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report includes a national total coal consumption for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. 14 figs., 145 tabs

  8. Coal marketing manual 1987

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    This manual provides information on the international coal market in tabulated format. Statistics are presented for the Australian coal industry, exports, currency movements, world coal production, coal and coke imports and exports. Detailed information is provided on the Australian coal industry including mine specific summaries. Pricing summaries for thermal and coking coal in 1987, coal quality standards and specifications, trends in coal prices and stocks. Imports and exports for World coal and coke, details of shipping, international ports and iron and steel production. An exporters index of Australian and overseas companies with industry and government contacts is included. 15 figs., 67 tabs.

  9. Coal industry annual 1996

    International Nuclear Information System (INIS)

    1997-11-01

    This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality, and emissions for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States.This report does not include coal consumption data for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. Consumption for nonutility power producers not included in this report is estimated to be 24 million short tons for 1996. 14 figs., 145 tabs

  10. Coal industry annual 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This report presents data on coal consumption, coal distribution, coal stocks, coal prices, and coal quality, and emissions for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States.This report does not include coal consumption data for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. Consumption for nonutility power producers not included in this report is estimated to be 24 million short tons for 1996. 14 figs., 145 tabs.

  11. Coal Industry Annual 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. Consumption for nonutility power producers not included in this report is estimated to be 21 million short tons for 1995.

  12. Coal Industry Annual 1995

    International Nuclear Information System (INIS)

    1996-10-01

    This report presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for Congress, Federal and State agencies, the coal industry, and the general public. Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility power producers that are not in the manufacturing, agriculture, mining, construction, or commercial sectors. Consumption for nonutility power producers not included in this report is estimated to be 21 million short tons for 1995

  13. Coal and recycling mark the way forward

    Energy Technology Data Exchange (ETDEWEB)

    Bignell, E.

    2000-11-01

    A report is given of this year's Mineral Engineering Society's annual conference held in Scarborough, UK. The themes of recycling and coal were chosen for the two days of technical presentations. Topics included the cleaning up of brown field sites; the use of recycled waste oxide to replace iron ore pellets for cooling furnaces in steel making; high pressure filtration of industrial mineral effluent; iron ore mining in Australia; screen development; the status of coal preparation technology, by RJB Mining; study of movement of material (to simulate coal) in a hopper; and a UK-Chinese project on reduction of sulphur in coal.

  14. Coal could quadruple by 2000. [Canada

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    The federal and most provincial governments are encouraging coal as an energy source. Coal production will increase 4-5 times by 2000 and world trade double with further increases to 2025. The Canadian steel industry is producing near capacity and forecasts a growth rate of 4% over the next ten years. Problems facing Canadian steel industry include the E1k River project, St. Lawrence toll increases, environmental coal requirements, and Chinese crude steel. Coal industry should have an excellent future if the Canadian governments can fill their leadership roles.

  15. In-seam seismics for coal

    Energy Technology Data Exchange (ETDEWEB)

    Saviron Cidon, L [OCICARBON, Madrid (Spain)

    1989-11-01

    The project objective is to assess the degree of applicability of in-seam seismic technology in Spanish coal mines for use as a tool to predict the presence of irregularities in coal seams. By the very nature of coal mining, a large number of in-seam seismic research results are put directly to the test by the ensuing underground operations. The statistics from this continuous process of verification in other countries show this method to be extremely successful. Indeed, the use of the method has become habitual and it is recognised as an efficient instrument for aiding the location of faults and other irregularities in coal seams. 3 figs., 2 tabs.

  16. Coal and Energy.

    Science.gov (United States)

    Bryant, Reba; And Others

    This teaching unit explores coal as an energy resource. Goals, student objectives, background information, and activity options are presented for each major section. The sections are: (1) an introduction to coal (which describes how and where coal was formed and explains the types of coal); (2) the mining of coal (including the methods and ways of…

  17. Report on the FY 1998 results of the New Sunshine Project (B version). Development of coal liquefaction technology (Development of base technology of liquefaction (Project on internationalization of coal liquefaction technology)); 1998 nendo sekitan ekika gijutsu kaihatsu seika hokokusho (B ban). Ekika kiban gijutsu no kaihatsu (sekitan ekika gijutsu no kokusaika jigyo)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In 1994, a memorandum on the research cooperation was agreed between NEDO and BPPT (The Agency for the Assessment and Application Technology) in Indonesia, based on the request for the coal liquefaction technology cooperation from BPPT. It includes the following items: conference for professionals to be held, invitation and training of Indonesian engineers, activity for joint field survey and potential survey of location of coal liquefaction commercial plant. Further in 1997, the secondary memorandum was concluded for the potential survey for securing the hydrogen required for coal liquefaction by coal gasification. The survey was summarized as the potential survey for location of coal liquefaction. In the testing study for improving economical efficiency of liquefaction process, it was made clear that the higher the Fe content of Banko coal is, the higher the reaction of liquefaction is, and that Fe compounds in coal show catalysis. In the Soroako area in Sulawesi island, there are the nickel mine run by PT. Inco. Soroako limonite is promising as catalyst material for commercial-scale coal liquefaction. In the gasification method, the plant construction cost increases, but the production amount of coal-derived liquid can be increased. That is more profitable than the production of hydrogen from natural gas. (NEDO)

  18. Novel Fuel Cells for Coal Based Systems

    Energy Technology Data Exchange (ETDEWEB)

    Thomas Tao

    2011-12-31

    The goal of this project was to acquire experimental data required to assess the feasibility of a Direct Coal power plant based upon an Electrochemical Looping (ECL) of Liquid Tin Anode Solid Oxide Fuel Cell (LTA-SOFC). The objective of Phase 1 was to experimentally characterize the interaction between the tin anode, coal fuel and cell component electrolyte, the fate of coal contaminants in a molten tin reactor (via chemistry) and their impact upon the YSZ electrolyte (via electrochemistry). The results of this work will provided the basis for further study in Phase 2. The objective of Phase 2 was to extend the study of coal impurities impact on fuel cell components other than electrolyte, more specifically to the anode current collector which is made of an electrically conducting ceramic jacket and broad based coal tin reduction. This work provided a basic proof-of-concept feasibility demonstration of the direct coal concept.

  19. Clean Coal Technology Programs: Program Update 2009

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-10-01

    The purpose of the Clean Coal Technology Programs: Program Update 2009 is to provide an updated status of the U.S. Department of Energy (DOE) commercial-scale demonstrations of clean coal technologies (CCT). These demonstrations have been performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII), and the Clean Coal Power Initiative (CCPI). Program Update 2009 provides: (1) a discussion of the role of clean coal technology demonstrations in improving the nation’s energy security and reliability, while protecting the environment using the nation’s most abundant energy resource—coal; (2) a summary of the funding and costs of the demonstrations; and (3) an overview of the technologies being demonstrated, along with fact sheets for projects that are active, recently completed, or recently discontinued.

  20. Effect of participation in the Fadama–II project on Participants' socio ...

    African Journals Online (AJOL)

    For most respondents, the socioeconomic status changed positively following participation in the project. Majority of the respondents in the study area participated actively in fadama meetings and other activities involved in project. Benefits derived from taking part in the project were generally high for most respondents (95.5 ...

  1. Effects of calcium magnesium acetate on the combustion of coal-water slurries. Final project report, 1 September 1989--28 February 1993

    Energy Technology Data Exchange (ETDEWEB)

    Levendis, Y.A.; Wise, D.; Metghalchi, H.; Cumper, J.; Atal, A.; Estrada, K.R.; Murphy, B.; Steciak, J.; Hottel, H.C.; Simons, G.

    1993-07-01

    To conduct studies on the combustion of coal water fuels (CWFs) an appropriate facility was designed and constructed. The main components were (1) a high-temperature isothermal laminar flow furnace that facilitates observation of combustion events in its interior. The design of this system and its characterization are described in Chapter 1. (2) Apparatus for slurry droplet/agglomerate particle generation and introduction in the furnace. These devices are described in Chapters 1 and 3 and other attached publications. (3) An electronic optical pyrometer whose design, construction theory of operation, calibration and performance are presented in Chapter 2. (4) A multitude of other accessories, such as particle fluidization devices, a suction thermometer, a velocimeter, high speed photographic equipment, calibration devices for the pyrometer, etc., are described throughout this report. Results on the combustion of CWF droplets and CWF agglomerates made from micronized coal are described in Chapter 3. In the same chapter the combustion of CWF containing dissolved calcium magnesium acetate (CMA) axe described. The combustion behavior of pre-dried CWF agglomerates of pulverized grain coal is contrasted to that of agglomerates of micronized coal in Chapter 4. In the same chapter the combustion of agglomerates of carbon black and diesel soot is discussed as well. The effect of CMA on the combustion of the above materials is also discussed. Finally, the sulfur capture capability of CMA impregnated micronized and pulverized bituminous coals is examined in Chapter 5.

  2. Results of the project 'combustion modelling' (BKM II); Ergebnisse des Projekts 'Brennkammermodellierung' (BKM II)

    Energy Technology Data Exchange (ETDEWEB)

    Noll, B.; Rachner, M.; Frank, P.; Schmitz, G.; Geigle, K.P.; Meier, W.; Schuetz, H.; Aigner, M. [DLR Deutsches Zentrum fuer Luft- und Raumfahrt e.V., Stuttgart (Germany). Inst. fuer Verbrennungstechnik; Kessler, R. [DLR Deutsches Zentrum fuer Luft- und Raumfahrt e.V., Goettingen (Germany). Inst. fuer Aerodynamik und Stroemungstechnik; Lehmann, B. [DLR Deutsches Zentrum fuer Luft- und Raumfahrt e.V., Koeln (Germany). Inst. fuer Antriebstechnik; Forkert, T. [DLR Deutsches Zentrum fuer Luft- und Raumfahrt e.V., Koeln (Germany). Simulation und Softwaretechnik

    2002-07-01

    In the year 1996 the spheres of competence of several DLR-Institutes working in the areas of fluid dynamics, reaction kinetics, combustion, numerical methods and laser measuring techniques have been brought together while contributing to the internal DLR project 'combustion chamber modelling (BKM)', in order to proceed with the computational simulation of combustion processes in combustion chambers of gas turbines. The main issue was the development of a research code for numerical simulation of fluid flow in real combustion chambers. Here the development of computational models of physical and chemical processes was emphasized, among other processes the formation of soot was treated. Moreover, a worldwide outstanding database of measured data for the purpose of code validation has been created within the framework of the BKM project using the laboratory facilities of the DLR, which are in Germany unique for the experimental investigation of the various processes in combustion chambers of gas turbines. The project BKM is part of the specific DLR-programme 'energy'. With the successful completion of the first phase of the project in 1998, a second project phase of three years (BKM II) has been launched at the beginning of 1999. Here the work of the first phase continued and new topics were tackled. The second phase of the project was partly founded by the DLR-programme 'aeronautics'. (orig.) [German] Im Jahr 1996 wurden die Faehigkeiten mehrerer DLR-Institute auf den Gebieten Stroemungsmechanik, Reaktionskinetik, Verbrennung sowie Numerische Verfahren und Laser-Messverfahren in dem DLR-internen Projekt 'Brennkammermodellierung' (BKM) zusammengefuehrt, um die rechnerische Simulation der Verbrennungsvorgaenge in Gasturbinen-Brennkammern voranzutreiben. Dabei war die Entwicklung eines Forschungscodes zur numerischen Simulation von realen Brennkammerstroemungen das vorrangige Ziel der Arbeiten. Ein besonderes Schwergewicht lag

  3. Educación Compensatoria. Aprendizaje temprano, éxito posterior (II: Carolina Abecedarian Project . [Compensatory education. Early learning, later success (II: Carolina Abecedarian Project

    Directory of Open Access Journals (Sweden)

    Eduardo López López

    2007-01-01

    Full Text Available This is a review study which analyzes research that evaluates the long term effects of an early education program, the Abecedarian Project. The Abecedarian Project (ABC is a preventive compensatory education program for children from 0 to 5 years of high risk mothers. The experimental group (E received an intensive preschool treatment, while the control (C group did not. At five years old, each group was divided into another two groups: Two of these new groups (EE and CE received intensive schooling until the children reached 8 years old, while the other groups (EC and CC received no special treatment. The total sample was measured until each child reached 21 years. The results were as follows: The young adults, treated in the preschool years, had on average significantly higher cognitive test scores, earned higher scores on reading and math tests; they completed more years of education, they were more likely to attend a 4-year college or university, and they were less likely to become teen parents. Furthermore, the mothers of these students were more likely to reach a higher level of instruction and employment. Finally, the article discusses the validity of the study and the factors associated to the benefits (the early beginning, intensity and continuity of the program. Este es un estudio de revisión en el que se analizan las investigaciones que evalúan los efectos a lo largo del tiempo del temprano Abecedarian Project (ABC. El ABC es un programa compensador preventivo de 0-5 años y entresacados de madres de alto riesgo. El grupo experimental (E recibe tratamiento preescolar intensivo, no el control (C. Se prolongó escolarmente hasta los 8 años, subdividiéndose ambos grupos: Dos -EE y CE- recibieron tratamiento intensivo; otros (EC y CC convencional. Fueron medidos hasta los 21. Resultados: Los jóvenes adultos, tratados preescolarmente, mejoraron en rendimiento mental, lector y matemático; alcanzaron mayores instrucción y presencia en

  4. Development of advanced blanket performance under irradiation and system integration through JUPITER-II project

    Energy Technology Data Exchange (ETDEWEB)

    Abe, Katsunori; Kohyama, Akira; Tanaka, Satoru; Namba, C.; Terai, T.; Kunugi, T.; Muroga, Takeo; Hasegawa, Akira; Sagara, A.; Berk, S.; Zinkle, Steven J.; Sze, Dai Kai; Petti, D. A.; Abdou, Mohamed A.; Morley, Neil B.; Kurtz, Richard J.; Snead, Lance L.; Ghoniem, Nasr M.

    2008-12-01

    This report describes an outline of the activities of the JUPITER-II collaboration (japan-USA program of Irradiation/Integration test for Fusion Research-II), Which has bee carried out through six years (2001-2006) under Phase 4 of the collabroation implemented by Amendment 4 of Annex 1 to the DOE (United States Department of Energy)-MEXT (Ministry of Education ,Culture,Sports,Science and Technology) Cooperation. This program followed the RTNS-II Program (Phase1:1982-4986), the FFTF/MOTA Program (Phase2:1987-1994) and the JUPITER Program (Phase 3: 1995-2000) [1].

  5. Retort for distilling coal oil

    Energy Technology Data Exchange (ETDEWEB)

    Gibbon, J

    1865-12-20

    The construction of a retort for extracting or distilling coal oil or other products from cannel coal, shale, or schist, and more particularly of small coal or dust technically called slack, consists in applying self-acting feed and discharge apparatus to a revolving cylindrical wrought or cast iron retort, and constructing the inner surface of the cylindrical retort with a projecting ridge which encircles the interior of the retort in a spiral manner, the same as the interior of a female screw, and the ridge may be either cast upon or riveted on the internal surface, and is so arranged to cause the material to be operated upon to advance from one end of the retort to the other, as the retort revolves by following the course of the spiral screw or worm formed by the projecting ridge.

  6. Coal -94

    International Nuclear Information System (INIS)

    Sparre, C.

    1994-05-01

    This report deals with use of coal and coke during 1993; information about techniques, environmental questions and markets are also given. Use of steamcoal for heating purposes has been reduced about 3 % during 1993 to 1,0 mill tons. This is the case especially for the heat generating boilers. Production in co-generation plants has been constant and has increased for electricity production. Minor plants have increased their use of forest fuels, LPG and NG. Use of steamcoal will probably go down in the immediate years both in heat generating and co-generating plants. Coal-based electricity has been imported from Denmark during 1993 corresponding to about 400 000 tons of coal, when several of our nuclear plants were stopped. Use of steamcoal in the industry has been constant at 700 000 tons. This level is supposed to be constant or to vary with business cycles. The import of metallurgical coal in 1993 was 1,6 mill tons like the year before. 1,2 mill tons coke were produced. Coke consumption in industry was 1,4 mill tons. 0,2 mill tons of coke were imported. Average price of steamcoal imported to Sweden in 1993 was 308 SEK/ton or 13 % higher than in 1992; this can be explained by the dollar price level increasing 34% in 1993. For the world, the average import price was 50,0 USD/ton, a decrease of 6 %. The coal market during 1993 was affected by less consumption in Europe, shut downs of European mines and decreasing prices. High freight price raises in Russia has affected the Russian export and the market in northern Europe. The prices have been stabilized recently. All Swedish plants meet emission limits of dust, SO 2 and NO x . Co-generation plants all have some sort of SO 2 -removal system; the wet-dry method is mostly used. A positive effect of the recently introduced NO x -duties is a 40% reduction

  7. Oxidation and carbonisation of coals: a case study of coal fire affected coals from the Wuda coalfield, Inner Mongolia, China

    Science.gov (United States)

    Kus, Jolanta; Meyer, Uwe; Ma, Jianwei; Chen-Brauchler, Dai

    2010-05-01

    At the coalfield of Wuda (Inner Mongolia, PR China) extensive underground coal fires cause widespread thermal and oxidative effects in coal seams. Within phase B of the Coal Fire Research Project of the Sino-German Initiative, methods for innovative fire-extinguishing technologies were investigated in multifaceted research approaches. Extensive investigations of oxidative and thermally affected coal seams in coal fire zone 18 were conducted in 2008 prior to application of new fire-extinguishing methods. We present results from the outcrop of coal seam No. 4 in the fire zone 18. The coal of seam No. 4 is of Early Permian age and belongs stratigraphically to the Shanxi Formation. The unaffected coal displays a high volatile bituminous A rank with a background value of random vitrinite reflectance ranging from 0.90 to 0.96 % Rr. Coal channel samples were coallected at actively extracted coal faces along multiple profiles with surface temperatures ranging from about 50° to 600°C. Microscopic examinations revealed a variety of products of coal exposure to the fire. Within coal samples, a marked rise in vitrinite reflectance from background values to 5.55% Rr (6.00 % Rmax) is encountered. In addition, a number of coal samples showed suppressed vitrinite reflectances ranging between 0.82 to 0.88% Rr. Further, seemingly heat unaffected coal samples display intensive development of oxidations rims at coal grain edges and cracks as well as shrinkage cracks and formation of iron oxides/hydroxides. Instead, thermally affected coal samples with higher coalification grade are further characterised by development of macropores (devolatilisation pores) in vitrinitic streaks, transformation of liptinite to meta-liptinite and micrinite as well as by natural coke particles of mostly porous nature and fine to coarse grained anisotropic mosaic. Coal petrographic investigations confirmed a hypothesis that both, oxidations as well as low temperature carbonisation govern the thermal

  8. Scientists help the children of Chernobyl. The GAST/VDEW project. Report on phase II: 1. April 1996 - 31. March 1998

    International Nuclear Information System (INIS)

    Reiners, Ch.; Biko, J.; Streffer, C.

    2000-05-01

    In this project phase II, from 1. April 1996 until 31. March 1998, the activities under the four partial projects entitled 'Therapy and training', 'Biological dosimetry', 'Dosimetry and risk assessment', and 'Coordination and examination authority at Minsk' have been continued and concluded, except for the partial project 'Therapy and training'. (orig./CB) [de

  9. Fiscal 1999 international engineer exchange project (Coal mining technology field). Overseas workshop (Australia); 1999 nendo gijutsusha koryu jigyo (tanko gijutsu bun'ya) kokusai koryu jigyo. Kaigai workshop (Goshu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the technology exchange with Australian coal mining engineers, the technical levels and needs on coal production, safety and environment in Australia, and the FS result on transfer of Japanese technologies, engineer exchange and joint research in a coal mining technology field. The overseas workshop (Australia) was held on Nov. 9, 1999 (Tues.) in Brisbane, Queensland. The Australia-Japan Technology Exchange Workshop on coal resources and coal mining technology includes 5 sessions (keynote address, trends and issues of coal resource development, coal resources and production technology, coal resources and safety technology, coal resources and environmental problems), and the open forum discussion on innovative technologies for coal mining. 6 Japanese specialists and 11 Australian specialists read papers. After the workshop, the participants visited Liddell Mine in New South Wales to master natural conditions, and production and safety technology levels of Australian coal mines, and to exchange various information with Australian coal mining engineers. (NEDO)

  10. Coal: the dinosaur wakes up; Charbon: le dinosaure se reveille

    Energy Technology Data Exchange (ETDEWEB)

    Rousseau, Y.; Cosnard, D

    2005-10-01

    In western countries, coal is considered as an industry of the past, but at the Earth's scale the situation is radically the opposite. Since three years, coal is the faster developing energy source, in particular thanks to China expansion and to the oil crisis which makes coal more competitive. This short paper presents the situation of coal mining in China: projects, working conditions and environmental impact. (J.S.)

  11. Clean Coal Technology Programs: Program Update 2003 (Volume 1)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  12. Fiscal 1998 overseas geological structure survey. Japan-China joint coal survey Mei-Xian project; 1998 nendo kaigai chishitsu kozo nado chosa hokokusho. Nippon Chugoku sekitan kyodo tansa Mei-Xian project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Japan-China joint coal survey was made through seismic prospecting by Japanese group and drilling prospecting by Chinese group. Mei-Xian mine property includes coal seams of the Jurassic period, and is covered with the quaternary period stratum without any coal seam. The base of the quaternary period stratum exists at depth of 50-400m, while the coal seams at depth of 300-700m. Among 11 existing seams, the 1st and 5th seams are main objects for prospecting. The 5th seam of 0.2-8.96m (2.95m in average) thick is the most expected important one, distributing all over the mine property. The 5th seam also has branch seams spreading over 2.5km from east to west and 1.2km from south to north in the center part of the mine property. The 1st seam of 0-8.62m (2.90m in average) thick is most thick in the south part of the mine property. The theoretical amount of coal deposits in the whole coal seam is estimated to be nearly 290,000,000t by Chinese group (nearly 50% of it in the 5th seam). That is also estimated to be nearly 346,000,000t by Japanese group (155,000,000t in the 5th seam). Both 1st and 5th seams are composed of sub-bituminous coal. (NEDO)

  13. Coal statistics 1977

    Energy Technology Data Exchange (ETDEWEB)

    Statistical Office of the European Communities

    1978-01-01

    Presents tables of data relating to the coal market in the European Community in 1977. The tables cover hard coal production, supply and trade; briquettes; cokes; lignite, brown coal briquettes and peat; and mines and coke ovens.

  14. Australian coal yearbook 1989

    Energy Technology Data Exchange (ETDEWEB)

    Aylward, A [ed.

    1989-01-01

    This yearbook contains a mine directory; details of coal export facilities and ports; annual coal statistics; a buyers' guide; names and addresses of industry organisations and an index of coal mine owners.

  15. Coal industry annual 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-06

    Coal Industry Annual 1993 replaces the publication Coal Production (DOE/FIA-0125). This report presents additional tables and expanded versions of tables previously presented in Coal Production, including production, number of mines, Productivity, employment, productive capacity, and recoverable reserves. This report also presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for a wide audience including the Congress, Federal and State agencies, the coal industry, and the general public. In addition, Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility Power Producers who are not in the manufacturing, agriculture, mining, construction, or commercial sectors. This consumption is estimated to be 5 million short tons in 1993.

  16. Coal industry annual 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Coal Industry Annual 1993 replaces the publication Coal Production (DOE/FIA-0125). This report presents additional tables and expanded versions of tables previously presented in Coal Production, including production, number of mines, Productivity, employment, productive capacity, and recoverable reserves. This report also presents data on coal consumption, coal distribution, coal stocks, coal prices, coal quality, and emissions for a wide audience including the Congress, Federal and State agencies, the coal industry, and the general public. In addition, Appendix A contains a compilation of coal statistics for the major coal-producing States. This report does not include coal consumption data for nonutility Power Producers who are not in the manufacturing, agriculture, mining, construction, or commercial sectors. This consumption is estimated to be 5 million short tons in 1993

  17. Australian black coal statistics 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This second edition of Australian black coal statistics replaces the Joint Coal Board's publication 'Black coal in Australia'. It includes an expanded international coal trade supplement. Sections cover resources of black coal, coal supply and demand, coal production, employment and productivity of mines, export data, coal consumption and a directory of producers.

  18. Preliminary experimental studies of waste coal gasification

    Energy Technology Data Exchange (ETDEWEB)

    Su, S.; Jin, Y.G.; Yu, X.X.; Worrall, R. [CSIRO, Brisbane, QLD (Australia). Advanced Coal Technology

    2013-07-01

    Coal mining is one of Australia's most important industries. It was estimated that coal washery rejects from black coal mining was approximately 1.82 billion tonnes from 1960 to 2009 in Australia, and is projected to produce another one billion tonnes by 2018 at the current production rate. To ensure sustainability of the Australian coal industry, we have explored a new potential pathway to create value from the coal waste through production of liquid fuels or power generation using produced syngas from waste coal gasification. Consequently, environmental and community impacts of the solid waste could be minimized. However, the development of an effective waste coal gasification process is a key to the new pathway. An Australian mine site with a large reserve of waste coal was selected for the study, where raw waste coal samples including coarse rejects and tailings were collected. After investigating the initial raw waste coal samples, float/sink testing was conducted to achieve a desired ash target for laboratory-scale steam gasification testing and performance evaluation. The preliminary gasification test results show that carbon conversions of waste coal gradually increase as the reaction proceeds, which indicates that waste coal can be gasified by a steam gasification process. However, the carbon conversion rates are relatively low, only reaching to 20-30%. Furthermore, the reactivity of waste coal samples with a variety of ash contents under N{sub 2}/air atmosphere have been studied by a home-made thermogravimetric analysis (TGA) apparatus that can make the sample reach the reaction temperature instantly.

  19. An introduction to the PISC II project - programme for the inspection of steel components

    International Nuclear Information System (INIS)

    Nichols, R.; McDonald, N.R.

    1987-01-01

    The paper describes the work of the Plate Inspection Steering Committee (PISC) on the non-destructive examination of reactor pressure vessel steels. A description is given of the PISC I exercise on flaw measurements in test plates, including the PISC procedure and the alternative procedures in the PISC I exercise. The motivation for a PISC II programme is described, together with the objectives and terms of reference of PISC II. (U.K.)

  20. Capital cost: high and low sulfur coal plants-1200 MWe. [High sulfur coal

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    This Commercial Electric Power Cost Study for 1200 MWe (Nominal) high and low sulfur coal plants consists of three volumes. The high sulfur coal plant is described in Volumes I and II, while Volume III describes the low sulfur coal plant. The design basis and cost estimate for the 1232 MWe high sulfur coal plant is presented in Volume I, and the drawings, equipment list and site description are contained in Volume II. The reference design includes a lime flue gas desulfurization system. A regenerative sulfur dioxide removal system using magnesium oxide is also presented as an alternate in Section 7 Volume II. The design basis, drawings and summary cost estimate for a 1243 MWe low sulfur coal plant are presented in Volume III. This information was developed by redesigning the high sulfur coal plant for burning low sulfur sub-bituminous coal. These coal plants utilize a mechanical draft (wet) cooling tower system for condenser heat removal. Costs of alternate cooling systems are provided in Report No. 7 in this series of studies of costs of commercial electrical power plants.

  1. Shahejie-Shahejie/Guantao/Wumishan and Carboniferous/Permian Coal-Paleozoic Total Petroleum Systems in the Bohaiwan Basin, China (based on geologic studies for the 2000 World Energy Assessment Project of the U.S. Geological Survey)

    Science.gov (United States)

    Ryder, Robert T.; Qiang, Jin; McCabe, Peter J.; Nuccio, Vito F.; Persits, Felix

    2012-01-01

    This report discusses the geologic framework and petroleum geology used to assess undiscovered petroleum resources in the Bohaiwan basin province for the 2000 World Energy Assessment Project of the U.S. Geological Survey. The Bohaiwan basin in northeastern China is the largest petroleum-producing region in China. Two total petroleum systems have been identified in the basin. The first, the Shahejie&ndashShahejie/Guantao/Wumishan Total Petroleum System, involves oil and gas generated from mature pods of lacustrine source rock that are associated with six major rift-controlled subbasins. Two assessment units are defined in this total petroleum system: (1) a Tertiary lacustrine assessment unit consisting of sandstone reservoirs interbedded with lacustrine shale source rocks, and (2) a pre-Tertiary buried hills assessment unit consisting of carbonate reservoirs that are overlain unconformably by Tertiary lacustrine shale source rocks. The second total petroleum system identified in the Bohaiwan basin is the Carboniferous/Permian Coal–Paleozoic Total Petroleum System, a hypothetical total petroleum system involving natural gas generated from multiple pods of thermally mature coal beds. Low-permeability Permian sandstones and possibly Carboniferous coal beds are the reservoir rocks. Most of the natural gas is inferred to be trapped in continuous accumulations near the center of the subbasins. This total petroleum system is largely unexplored and has good potential for undiscovered gas accumulations. One assessment unit, coal-sourced gas, is defined in this total petroleum system.

  2. Report on the achievements in the Sunshine Project in fiscal 1986. Surveys on systems to structure a coal liquefaction database; 1986 nendo sekitan ekika database kochiku no tame no system chosa seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-03-01

    Surveys are carried out on the current status of information control systems for development projects being performed or planned in developing coal liquefaction technologies. The conception for structuring a coal liquefaction database (CLDB) is made clear to manage comprehensively and utilize effectively the information in the systems. Section 3 investigated and analyzed the current status of data processing for experimental plants. The data for each experimental plant are processed individually. Therefore, it is preferable that the CLDB shall be provided with accommodating locations to receive respective data. Section 4 put into order the flows of operation and information in the coal liquefaction research, and depicted an overall configuration diagram for the system. Section 5 discusses problems in structuring this system. There is a large number of problems to be discussed from now on, not only in the technological aspect, but in analyzing the organizational roles of NEDO and commissioned business entities, and the needs of users. The last section summarizes the steps and schedule for developing this system. The development steps should preferably be implemented stepwise along the progress of the experimental plants, in such an order as the fundamental database, analysis database and engineering database. (NEDO)

  3. Externalities of fuel cycles 'ExternE' project. Coal fuel cycle. Estimation of physical impacts and monetary valuation for priority impact pathways

    International Nuclear Information System (INIS)

    Berry, J.E.; Holland, M.R.; Watkiss, P.R.

    1994-01-01

    agreement on a variety of methodological issues was reached on both sides of the Atlantic. Since 1993 the study has continued in Europe as the ExternE-Project, and now involves an international team of more than 30 organisations. The current study has 4 principal objectives; 1) To design a unified methodology for quantifying the various social costs associated with the production and consumption of energy. 2) To produce a framework to account for the external costs that result from incremental use of different fuels. 3) To use the methodology in an international comparative analysis. 4) To identify critical methodological issues and research requirements. At the same time as the publication of the present report, further reports are being published on the other major fuel cycles for electricity generation, including uranium, lignite, oil, gas, wind and biomass. In addition a further volume, providing greater detail on the methodology used for assessment of the fossil fuel cycles will also be published shortly. This document assesses the progress made in quantifying environmental and health damages associated with the coal fuel cycle. Estimates of impacts have been made following critical review of existing data and models rather than from original basic research. This review has been performed by a multi-disciplinary team including specialists in the fields of health, forestry, ecology, materials science, atmospheric chemistry and physics, energy technology, computer science and economics

  4. 1982 Australian coal conference papers

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    This third Australian coal conference included papers discussing the market for coal, finance and investment, use of computers, mining, coal research, coal preparation and waste disposal, marketing and trade, and the transport of coal. All papers have been individually abstracted.

  5. Energy strategy would slow coal's growth, says DOE

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The National Energy Strategy (NES) recently announced by the Bush Administration would slow the growth in use of coal by hundreds of millions of tons of coal by hundreds of millions of tons after 2000, according to the Department of Energy's (DOE) own figures. If today's policies are continued, coal consumption will nearly triple by 2030. Current annual consumption of more than 900 million tons (19 quadrillion Btus) would rise to 1,550 million tons in 2010 and to nearly 2,600 million tons by 2030. Coal's share of electricity generation, now about 55%, would grow to 75% by 2030 under the current policy base assumptions of the DOE. The NES, however, projects that surge of nuclear power plant construction will stem the growth of coal use. The strategy would still increase coal use, from 19 quadrillion Btus today to about 28 quads in 2010, but to only 32 quads by 2030. By 2030, coal would account for less than 50% of electricity generation under the NES. Total clean coal technologies capacity is substantially lower under the NES scenario case than under the clean coal actions alone. The strategy also contains good news for the coal industry in the short run. It holds out two main goals for coal policy: maintaining coal's competitiveness while meeting environmental, health and safety requirements; and creating a favorable export climate for US coal and coal technology

  6. Research report of FY 1997 on the environmentally acceptable coal utilization system introduction support project. Follow-up project on circulating fluidized bed boiler introduction (Calaca Batangas Thermal Power Station); 1997 nendo chosa hokokusho. Kankyo chowagata sekitan riyo system donyu shien jigyo (junkan ryudosho boiler ni kakawaru follow up jigyo (Calaca Batangas karyoku hatsudensho))

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    For the follow-up project, to promote the diffusion of results of the clean coal technology (CCT) model projects, experts of circulating fluidized bed boilers were dispatched, to guide and advise for the operation of facilities introduced in these projects. The purpose of these projects is to diffuse the CCTs, and to support the promotion of environmental measures. Some guidance and advice about operation processes, data processing, operation regulation, maintenance, and boiler maintenance works were provided to the Ministry of Energy and Electric Power Corporation of the Philippines. Semirara, Malangas, and Samar coals in the Philippines were used for the tests. The boiler facilities could be operated by Philippine operators themselves. Based on the guidance and advice about operation processes, combustion tests using various Philippine coals were also planned and conducted by themselves. The maintenance techniques were transferred to Philippine operators through the inspection, repair and advice. The Philippine side understood the technologies well, and the circulating fluidized bed boiler technology was independently educated in the Philippines. 23 figs., 16 tabs.

  7. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  8. Development of dry coal feeders

    Science.gov (United States)

    Bonin, J. H.; Cantey, D. E.; Daniel, A. D., Jr.; Meyer, J. W.

    1977-01-01

    Design and fabrication of equipment of feed coal into pressurized environments were investigated. Concepts were selected based on feeder system performance and economic projections. These systems include: two approaches using rotating components, a gas or steam driven ejector, and a modified standpipe feeder concept. Results of development testing of critical components, design procedures, and performance prediction techniques are reviewed.

  9. 2nd clean coal & carbon capture - securing the future. Conference documentation and delegate information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The presentations covered: policies and the regulatory environment - creating opportunities for clean coal technologies; mastering the economics of clean coal - gaining finance and investment for key projects; international initiatives in clean coal technologies; power plant developments; broader uses for coal; and carbon capture and storage.

  10. Summary report of Japan-US joint project. JUPITER-II. FuY 2001 - 2006

    International Nuclear Information System (INIS)

    Abe, K.; Kohyama, A.; Tanaka, S.; Muroga, T.; Namba, C.; Sze, D.K.

    2008-03-01

    This report summarizes the scientific accomplishments achieved through the JUPITER-II Japan-US Collaboration Program. The JUPITER-II collaboration (Japan-USA Program of Irradiation/Integration Test for Fusion Research -II) has been carried out through six years (2001-2006) under Phase 4 of the collaboration implemented by Amendment 4 of Annex I to the MEXT (Ministry of Education, Culture, Sports, Science and Technology)-DOE (United States Department of Energy) Cooperation. This program followed the RTNS-II Program (Phase 1: 1982-1986), the FFTF/MOTA Program (Phase 2: 1987-1994) and the JUPITER Program (Phase 3: 1995-2000). The JUPITER-II collaboration was established to provide the scientific foundations for understanding the integrated behavior of blanket materials combinations operating under conditions characteristic of fusion reactors, including interactive neutron irradiation effects, high temperature coolant flow phenomena, heat and mass transport in blanket materials, and coolant chemistry and its interactions with surrounding materials. The scientific concept of this program is to study the key technology in macroscopic system integration for advanced blanket based on an understanding of the relevant mechanics at the microscopic level. The 44 of the presented papers are indexed individually. (J.P.N.)

  11. 76 FR 336 - Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) for PacRim Coal's Proposed...

    Science.gov (United States)

    2011-01-04

    ... Environmental Impact Statement (SEIS) for PacRim Coal's Proposed Chuitna Coal Project AGENCY: U.S. Army Corps of... Chuitna Coal Project. It is anticipated that the Environmental Protection Agency (EPA), the Native Village... the Alaska Surface Coal Mining Control and Reclamation Act (ASCMCRA) permit, which governs all aspects...

  12. The use of coal mining wastes as soilles growing medium; Utilizacion de los Esteriles del Carbon como Sustratos en Cultivos sin Suelo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    This project was aimed at evaluating the technical appropriateness of coal mining wastes as: (I) substrate in soilless culture (hydroponics) being used as the only medium or in a mixture with other materials; (II) basic component for container gardening of decorative plants in order to determine the standard mixture with other materials and the most appropriate plant. A greenhouse was built for conducting the tests, vegetables and decorative plants were planted and an exhaustive control of the plantations was carried out. The results obtained proved that coal mining wastes can be used as soilless growing medium for vegetables and for container gardening. At present, the company HORPLASMA with three greenhouses (11,300 m``2) is dedicated to the growing of vegetables with coal mining wastes as substrate and the pot-culture of more than 30,000 decorative plants using as substrate a mixture of 60% coal mining wastes and 40% turf. (Author)

  13. FY 1999 report on the potential survey of the environmentally friendly type coal utilization system - Dispatch of engineers. A. Project for supporting the introduction of the environmentally friendly type coal utilization system (model project)/pre-survey for the potential survey; 1999 nendo kankyo chowa gata sekitan riyo system kanosei chosa. Senmomka haken A. kankyo chowa gata sekitan riyo system donyu shien jigyo (model jigyo) - Kanosei chosa no jizen chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of the improvement of coal utilization technology and environmental preservation, the paper conducted the pre-survey of the introduction of coke oven gas desulfurization facilities in China and pre-survey of potentiality of the environmentally friendly type coal utilization system in India. The pre-survey in China was made for Anyang Steel Group Co. Ltd. and Laiwu Steel Group Co. Ltd. to judge their adaptability as site for the demonstrative project on the introduction of coke oven gas desulfurization facilities. As a result, it was confirmed that the former satisfied the conditions on Japan side such as the space for installation and prospect for fund raising. However, the amount of COG treatment was larger than that planned at Japan side, and it was found that as to the recovered sulfur, the company wanted the solid sulfur different from the fused sulfur planned at Japan side. In the survey in India, explanations were made to India of CFBC and the fluidized bed cement sintering system, bio-briquette production facilities, facilities for environmental measures, coal reforming technology, etc. At the same time, the site survey was made to examine/analyze possibilities of spread/development of Japan's CCT. (NEDO)

  14. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY II QUALITY ASSURANCE PROJECT PLANS

    Science.gov (United States)

    Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...

  15. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume II: Final Career Education Evaluation Report.

    Science.gov (United States)

    Stenner, A. Jackson; And Others

    This document contains the second of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  16. Coal surface control for advanced physical fine coal cleaning technologies. Final report, September 19, 1988--August 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Morsi, B.I.; Chiang, S.H.; Sharkey, A.; Blachere, J.; Klinzing, G.; Araujo, G.; Cheng, Y.S.; Gray, R.; Streeter, R.; Bi, H.; Campbell, P.; Chiarlli, P.; Ciocco, M.; Hittle, L.; Kim, S.; Kim, Y.; Perez, L.; Venkatadri, R.

    1992-12-31

    This final report presents the research work carried out on the Coal Surface Control for Advanced Physical Fine Coal Cleaning Technologies project, sponsored by the US Department of Energy, Pittsburgh Energy Technology Center (DOE/PETC). The project was to support the engineering development of the selective agglomeration technology in order to reduce the sulfur content of US coals for controlling SO{sub 2} emissions (i.e., acid rain precursors). The overall effort was a part of the DOE/PETCs Acid Rain Control Initiative (ARCI). The overall objective of the project is to develop techniques for coal surface control prior to the advanced physical fine coal cleaning process of selective agglomeration in order to achieve 85% pyrite sulfur rejection at an energy recovery greater than 85% based on run-of-mine coal. The surface control is meant to encompass surface modification during grinding and laboratory beneficiation testing. The project includes the following tasks: Project planning; methods for analysis of samples; development of standard beneficiation test; grinding studies; modification of particle surface; and exploratory R&D and support. The coal samples used in this project include three base coals, Upper Freeport - Indiana County, PA, Pittsburgh NO. 8 - Belmont County, OH, and Illinois No. 6 - Randolph County, IL, and three additional coals, Upper Freeport - Grant County- WV, Kentucky No. 9 Hopkins County, KY, and Wyodak - Campbell County, WY. A total of 149 drums of coal were received.

  17. Ultravitrinite coals from Chukotka

    Energy Technology Data Exchange (ETDEWEB)

    Lapo, A.V.; Letushova, I.A.

    1979-03-01

    Chemical and petrographic analysis was conducted on coals from the Anadyrya and Bukhti Ugol'noi deposits. Characteristics of the most prevalent type of vitrinite coals in both regions are presented here. Anadyrya coals belong to a transitional phase between brown coal and long flame. Ultravitrinite coals predominate. Gas coals from Bukti Ugol'noi have a higher carbon content than Anadyrya coals. They also have a higher hydrogen content and yield of initial resin. In several cases there was also a higher yield of volatile substances. Chukotka coals are characterized by a 10 percent higher initial resin yield than equally coalified Donetsk coals, other indicators were equal to those of Donetsk coals. Because of this, Chukotka coals are suitable for fuel in power plants and as raw materials in the chemical industry. (15 refs.) (In Russian)

  18. The European Coal Market: Will Coal Survive the EC's Energy and Climate Policies?

    International Nuclear Information System (INIS)

    Cornot-Gandolphe, Sylvie

    2012-01-01

    conventional reserves of fossil fuels. Coal contributes to the economic activity and employment in the region. The EU mining industry employs 260,000 workers (direct jobs) and the turnover of the whole coal industry is estimated at Euros 25 billion a year. Coal prices, despite their rising trend in the past few years, are much lower than competing fuels: half the price of natural gas imported in Europe. As coal ensures safe, reliable, affordable and sustainable energy for all, it will be very much needed in the years to come. However, coal is proscribed in a CO 2 -free environment. Its combustion in thermal power plants - its main outlet in Europe - emits twice as much CO 2 as gas plants. Although a lot of R and D work is done to capture CO 2 emissions from coal plants and store it, no zero emission commercial plants have yet started operation. Several CCS projects have been delayed, or even cancelled, in the past few years due to regulatory uncertainties, a lack of funding and public opposition to CO 2 storage. The current European economic crisis and the large sovereign debts have also reduced public funding in CCS projects. The future of coal in Europe is therefore very uncertain. Will CCS development allows it to remain a fuel of choice, given large available reserves at low prices, compared with competing energy sources? Or will coal disappear from the European energy mix? How fast will the decline in European coal production be? This report looks at these issues and highlights some facts, trends and regulation that may affect the supply and demand of coal in the future. The analysis concentrates on steam coal used to generate electricity, since the power generation sector is by far the largest user of coal in Europe. The first part of this report looks at the European coal market region-wide. Chapter 1 describes the EU coal market in the global context. Chapter 2 analyses the significance of the European coal mining industry and its future after the end of state aid

  19. Coal Tar and Coal-Tar Pitch

    Science.gov (United States)

    Learn about coal-tar products, which can raise your risk of skin cancer, lung cancer, and other types of cancer. Examples of coal-tar products include creosote, coal-tar pitch, and certain preparations used to treat skin conditions such as eczema, psoriasis, and dandruff.

  20. Horonobe Underground Research Laboratory project. Plans of investigations during shaft and drift excavation (Construction of underground facilities: Phase II)

    International Nuclear Information System (INIS)

    2005-06-01

    Horonobe Underground Research Laboratory Project is planned for over 20 years to establish the scientific and technical basis for the underground disposal of high-level radioactive wastes in Japan. The investigations are conducted by JNC in three phases, from the surface (Phase I), during the construction of the underground facilities (Phase II), and using the facilities (Phase III). This report concerns the investigation plans for Phase II. During excavation of shafts and drifts, detailed geological and borehole investigation will be conducted and the geological model constructed in Phase I is evaluated and revised by newly acquired data of geophysical and geological environment. Detailed in-situ experiments, as well as the effects of shaft excavation, are also done to study long-term changes, rock properties, groundwater flow and chemistry to ensure the reliability of repository technology and establish safety assessment methodology. (S. Ohno)