Sample records for cleanup technical issues

  1. Hanford tank clean up: A guide to understanding the technical issues

    International Nuclear Information System (INIS)

    Gephart, R.E.; Lundgren, R.E.

    1995-01-01

    One of the most difficult technical challenges in cleaning up the US Department of Energy's (DOE) Hanford Site in southeast Washington State will be to process the radioactive and chemically complex waste found in the Site's 177 underground storage tanks. Solid, liquid, and sludge-like wastes are contained in 149 single- and 28 double-shelled steel tanks. These wastes contain about one half of the curies of radioactivity and mass of hazardous chemicals found on the Hanford Site. Therefore, Hanford cleanup means tank cleanup. Safely removing the waste from the tanks, separating radioactive elements from inert chemicals, and creating a final waste form for disposal will require the use of our nation's best available technology coupled with scientific advances, and an extraordinary commitment by all involved. The purpose of this guide is to inform the reader about critical issues facing tank cleanup. It is written as an information resource for the general reader as well as the technically trained person wanting to gain a basic understanding about the waste in Hanford's tanks -- how the waste was created, what is in the waste, how it is stored, and what are the key technical issues facing tank cleanup. Access to information is key to better understanding the issues and more knowledgeably participating in cleanup decisions. This guide provides such information without promoting a given cleanup approach or technology use

  2. Hanford tank clean up: A guide to understanding the technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Gephart, R.E.; Lundgren, R.E.

    1995-12-31

    One of the most difficult technical challenges in cleaning up the US Department of Energy`s (DOE) Hanford Site in southeast Washington State will be to process the radioactive and chemically complex waste found in the Site`s 177 underground storage tanks. Solid, liquid, and sludge-like wastes are contained in 149 single- and 28 double-shelled steel tanks. These wastes contain about one half of the curies of radioactivity and mass of hazardous chemicals found on the Hanford Site. Therefore, Hanford cleanup means tank cleanup. Safely removing the waste from the tanks, separating radioactive elements from inert chemicals, and creating a final waste form for disposal will require the use of our nation`s best available technology coupled with scientific advances, and an extraordinary commitment by all involved. The purpose of this guide is to inform the reader about critical issues facing tank cleanup. It is written as an information resource for the general reader as well as the technically trained person wanting to gain a basic understanding about the waste in Hanford`s tanks -- how the waste was created, what is in the waste, how it is stored, and what are the key technical issues facing tank cleanup. Access to information is key to better understanding the issues and more knowledgeably participating in cleanup decisions. This guide provides such information without promoting a given cleanup approach or technology use.

  3. Particulate hot gas stream cleanup technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Pontius, D.H.; Snyder, T.R.

    1999-09-30

    The analyses of hot gas stream cleanup particulate samples and descriptions of filter performance studied under this contract were designed to address problems with filter operation that have been linked to characteristics of the collected particulate matter. One objective of this work was to generate an interactive, computerized data bank of the key physical and chemical characteristics of ash and char collected from operating advanced particle filters and to relate these characteristics to the operation and performance of these filters. The interactive data bank summarizes analyses of over 160 ash and char samples from fifteen pressurized fluidized-bed combustion and gasification facilities utilizing high-temperature, high pressure barrier filters.

  4. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  5. Particulate hot gas stream cleanup technical issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    This is the tenth in a series of quarterly reports describing the activities performed under Contract No. DE-AC21-94MC31160. Analyses of Hot Gas Stream Cleanup (HGCU) ashes and descriptions of filter performance address aspects of filter operation that are apparently linked to the characteristics of the collected ash or the performance of the ceramic bed filter elements. Task I is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters (APFS) and to relate these ash properties to the operation and performance of these filters. Task 2 concerns testing and failure analysis of ceramic filter elements. Under Task I during the past quarter, analyses were performed on a particulate sample from the Transport Reactor Demonstration Unit (TRDU) located at the University of North Dakota Energy and Environmental Research Center. Analyses are in progress on ash samples from the Advanced Particulate Filter (APF) at the Pressurized Fluidized-Bed Combustor (PFBC) that was in operation at Tidd and ash samples from the Pressurized Circulating Fluid Bed (PCFB) system located at Karhula, Finland. A site visit was made to the Power Systems Development Facility (PSDF) to collect ash samples from the filter vessel and to document the condition of the filter vessel with still photographs and videotape. Particulate samples obtained during this visit are currently being analyzed for entry into the Hot Gas Cleanup (HGCU) data base. Preparations are being made for a review meeting on ash bridging to be held at Department of Energy Federal Energy Technology Center - Morgantown (DOE/FETC-MGN) in the near future. Most work on Task 2 was on hold pending receipt of additional funds; however, creep testing of Schumacher FT20 continued. The creep tests on Schumacher FT20 specimens just recently ended and data analysis and comparisons to other data are ongoing. A summary and analysis of these creep results will be sent out shortly. Creep

  6. Facilitating Site Specific and Citizens Advisory Boards: Running Effective Meetings that Involve Complex Technical Issues

    International Nuclear Information System (INIS)

    Freeman, J.

    2009-01-01

    Environmental cleanup issues at federal sites are more often than not on the agendas of meetings of the Site Specific Advisory Boards (SSABs), also called Citizens Advisory Boards (CABs), that exist at most U.S. Department of Energy (DOE) sites with an Environmental Management (EM) mission. In 1994, when Congress established these committees comprised of local citizens, it enabled community stakeholders to become more directly involved in DOE EM cleanup decisions. This involvement is to help the agency make cost-effective and environmentally sound decisions which lead to faster, safer cleanups. Eight local Boards that fall under the Federal Advisory Committee Act-chartered EM SSAB charter are found in Hanford, Washington; Idaho; Northern New Mexico; Nevada; Oak Ridge, Tennessee; Paducah, Kentucky; Portsmouth, Ohio; and at the Savannah River Site in South Carolina. These boards provide advice and recommendations about EM site-specific issues such as cleanup standards (how clean is clean?), environmental restoration, waste management, the stabilization and disposal of non-stockpile nuclear materials, future land use and long-term stewardship, risk assessment and management, and cleanup science and technology activities. These issues are, by their very nature, loaded with complicated technical terms and strategies, scientific data and interpretations, and long histories of studies and reports. The members of SSABs and CABs rotate on and off the Boards according to defined terms of office, thereby routinely opening the Boards' ranks to new members, many of whom are new to the issues. In addition, members of the public who have access to public comment periods at each Board meeting run up against the same daunting menu of obscure acronyms, scientific terms and notations, and an historical trail which is not always evident except to those involved with the issues over many years. How does a facilitator effectively guide such a group of citizens, each of whom arrives to

  7. Recent developments in NRC guidelines for atmosphere cleanup systems

    International Nuclear Information System (INIS)

    Bellamy, R.R.

    1976-01-01

    The Nuclear Regulatory Commission (NRC) maintains the policy of updating when necessary, its published guidance for the design of engineered safety feature (ESF) and normal ventilation systems. The guidance is disseminated by means of issuing new, or revisions to, existing Regulatory Guides, Standard Review Plans, Branch Technical Positions and Technical Specifications. A revised Regulatory Guide, new Technical Specifications and new Standard Review Plans with Branch Technical Positions for atmosphere cleanup systems are discussed. Regulatory Guide 1.52, ''Design, Testing and Maintenance Criteria for Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants,'' was issued in July 1973. The major comments received from the nuclear industry since the guide was issued, NRC's experience in implementing the guide in recent license applications, status of operating plants in meeting the guidelines and NRC's continuing assessment of operating data and laboratory tests to assure that the guide reflects the latest technology are discussed

  8. Technical support for the EPA cleanup rule on radioactively contaminated sites

    Energy Technology Data Exchange (ETDEWEB)

    Hull, H.B.; Newman, A.; Wolbarst, A.B. [Environmental Protection Agency, Washington, DC (United States)] [and others

    1995-12-31

    The U.S. Environmental Protection Agency (EPA) is developing a radiation site cleanup regulation for the protection of the public from radionuclide contamination at sites that are to be cleaned up and released for public use. The regulation will apply to sites under the control of Federal agencies, and to sites licensed by the Nuclear Regulatory Commission (NRC) or NRC Agreement States. The agency is therefore conducting a comprehensive technical analysis aimed at developing information that will be used to support the rule. This presentation describes the regulation and the approach developed to determine how radiological health impacts and volumes of soil requiring remediation vary as functions of the possible cleanup dose or risk level.

  9. U Plant Geographic Zone Cleanup Prototype

    International Nuclear Information System (INIS)

    Romine, L.D.; Leary, K.D.; Lackey, M.B.; Robertson, J.R.

    2006-01-01

    The U Plant geographic zone (UPZ) occupies 0.83 square kilometers on the Hanford Site Central Plateau (200 Area). It encompasses the U Plant canyon (221-U Facility), ancillary facilities that supported the canyon, soil waste sites, and underground pipelines. The UPZ cleanup initiative coordinates the cleanup of the major facilities, ancillary facilities, waste sites, and contaminated pipelines (collectively identified as 'cleanup items') within the geographic zone. The UPZ was selected as a geographic cleanup zone prototype for resolving regulatory, technical, and stakeholder issues and demonstrating cleanup methods for several reasons: most of the area is inactive, sufficient characterization information is available to support decisions, cleanup of the high-risk waste sites will help protect the groundwater, and the zone contains a representative cross-section of the types of cleanup actions that will be required in other geographic zones. The UPZ cleanup demonstrates the first of 22 integrated zone cleanup actions on the Hanford Site Central Plateau to address threats to groundwater, the environment, and human health. The UPZ contains more than 100 individual cleanup items. Cleanup actions in the zone will be undertaken using multiple regulatory processes and decision documents. Cleanup actions will include building demolition, waste site and pipeline excavation, and the construction of multiple, large engineered barriers. In some cases, different cleanup actions may be taken at item locations that are immediately adjacent to each other. The cleanup planning and field activities for each cleanup item must be undertaken in a coordinated and cohesive manner to ensure effective execution of the UPZ cleanup initiative. The UPZ zone cleanup implementation plan (ZCIP) [1] was developed to address the need for a fundamental integration tool for UPZ cleanup. As UPZ cleanup planning and implementation moves forward, the ZCIP is intended to be a living document that will

  10. The cleanup of Three Mile Island Unit 2: A technical history, 1979--1990

    International Nuclear Information System (INIS)

    Holton, W.C.; Negin, C.A.; Owrutsky, S.L.

    1990-09-01

    The Electric Power Research Institute has sponsored a technical history project to ensure that the logic and consequences of decisions made during the Three Mile Island Unit 2 (TMI-2) cleanup are available for recovery from an accident involving damaged fuel and fission product release. The objectives of the history project are to identify the major questions and challenges facing management; describe the influencing factors and the options available; and present the final decisions and their consequences. This history of decision-making is intended to assist a project manager who must respond to a fuel damage accident, even if the scale is much smaller than TMI-2. The history has focused on decisions related to seven major aspects of the cleanup: cleanup management, postaccident stabilization, personnel protection, data acquisition, radioactive waste management, decontamination, and defueling. A detailed chronology and extensive bibliography accompany the text

  11. Systems engineering functions and requirements for the Hanford cleanup mission. First issue, Addendum 2

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, J.J.

    1994-01-01

    This addendum provides the technical detail of a systems engineering functional analysis for the Hanford cleanup mission. Details of the mission analysis including mission statement, scope, problem statement, initial state definition, and final state definition are provided in the parent document. The functional analysis consists of Input Computer Automated Manufacturing Definition (IDEFO) diagrams an definitions, which will be understood by systems engineers, but which may be difficult for others to comprehend. For a more complete explanation of this work, refer to the parent document. The analysis covers the total Hanford cleanup mission including the decomposition levels at which the various Hanford programs or integrated activities are encountered.

  12. Particulate hot gas stream cleanup technical issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    This is the eleventh in a series of quarterly reports describing the activities performed under Contract No. DE-AC21-94MC31160. Analyses of Hot Gas Stream Cleanup (HGCU) ashes and descriptions of filter performance address aspects of filter operation that are apparently linked to the characteristics of the collected ash or the performance of the ceramic bed filter elements. Task 1 is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters (APFS) and to relate these ash properties to the operation and performance of these filters. Task 2 concerns testing and failure analysis of ceramic filter elements. Under Task 1 during the past quarter, analyses were completed on samples obtained during a site visit to the Power Systems Development Facility (PSDF). Analyses are in progress on ash samples from the Advanced Particulate Filter (APF) at the Pressurized Fluidized-Bed Combustor (PFBC) that was in operation at Tidd and ash samples from the Pressurized Circulating Fluid Bed (PCFB) system located at Karhula, Finland. An additional analysis was performed on a particulate sample from the Transport Reactor Demonstration Unit (TRDU) located at the University of North Dakota Energy and Environmental Research Center. A manuscript and poster were prepared for presentation at the Advanced Coal-Based Power and Environmental Systems `97 Conference scheduled for July 22 - 24, 1997. A summary of recent project work covering the mechanisms responsible for ash deposit consolidation and ash bridging in APF`s collecting PFB ash was prepared and presented at FETC-MGN in early July. The material presented at that meeting is included in the manuscript prepared for the Contractor`s Conference and also in this report. Task 2 work during the past quarter included mechanical testing and microstructural examination of Schumacher FT20 and Pall 326 as- manufactured, after 540 hr in service at Karhula, and after 1166 hr in service at

  13. Innovative technologies for groundwater cleanup

    International Nuclear Information System (INIS)

    Yow, J.L. Jr.

    1992-09-01

    These notes provide a broad overview of current developments in innovative technologies for groundwater cleanup. In this context, groundwater cleanup technologies include site remediation methods that deal with contaminants in ground water or that may move from the vadose zone into ground water. This discussion attempts to emphasize approaches that may be able to achieve significant improvements in groundwater cleanup cost or effectiveness. However, since data for quantitative performance and cost comparisons of new cleanup methods are scarce, preliminary comparisons must be based on the scientific approach used by each method and on the site-specific technical challenges presented by each groundwater contamination situation. A large number of technical alternatives that are now in research, development, and testing can be categorized by the scientific phenomena that they employ and by the site contamination situations that they treat. After reviewing a representative selection of these technologies, one of the new technologies, the Microbial Filter method, is discussed in more detail to highlight a promising in situ groundwater cleanup technology that is now being readied for field testing

  14. Innovative technologies for soil cleanup

    International Nuclear Information System (INIS)

    Yow, J.L. Jr.

    1992-09-01

    These notes provide a broad overview of current developments in innovative technologies for soil cleanup. In this context, soil cleanup technologies include site remediation methods that deal primarily with the vadose zone and with relatively shallow, near-surface contamination of soil or rock materials. This discussion attempts to emphasize approaches that may be able to achieve significant improvements in soil cleanup cost or effectiveness. However, since data for quantitative performance and cost comparisons of new cleanup methods are scarce, preliminary comparisons must be based on the scientific approach used by each method and on the sits-specific technical challenges presented by each sold contamination situation. A large number of technical alternatives that are now in research, development, and testing can be categorized by the scientific phenomena that they employ and by the site contamination situations that they treat. After cataloging a representative selection of these technologies, one of the new technologies, Dynamic Underground Stripping, is discussed in more detail to highlight a promising soil cleanup technology that is now being field tested

  15. EPA's technical methodology for the development of cleanup regulations for radioactively-contaminated soils and buildings

    International Nuclear Information System (INIS)

    Hull, H.B.; Doehnert, M.; Wolbarst, A.; Mauro, J.J.; Ralston, L.

    1995-01-01

    The total number of sites contaminated with radionuclides in the United States is in the thousands. These sites range in size from corners of laboratories to sprawling nuclear weapons facilities covering many square miles of land. The U.S. Environmental Protection Agency (EPA) is proposing regulations for the protection of the public from radionuclide contamination at sites that are to be cleaned up and released for public use. The rule will apply to site under the control of Federal agencies, and to sites licensed by the Nuclear Regulatory Commission (NRC) or NRC Agreement States. In support of this rulemaking, EPA is conducting a comprehensive technical analysis which will provide information on the volumes of soil requiring remediation at various possible dose and risk levels. The analysis will also provide information at different cleanup levels on the number of potential adverse health effects among people living or working on or near a site following the cleanup of its radioactive contamination. This paper summarizes the overall approach for the technical analysis. (author)

  16. US nuclear cleanup shows signs of progress

    International Nuclear Information System (INIS)

    Renner, R.

    1997-01-01

    The U.S. Department of Energy's program for dealing with the radioactive and hazardous wastes at its former nuclear weapons production sites and at the national laboratories has been criticized for its expense and slow pace of cleanup. The largest environmental restoration and waste management program in the world faces formidable technical and scientific problems and these, according to numerous investigative committees and commissions, have been compounded by poor management, misuse of technology, and failure to appreciate the need for new basic scientific knowledge to solve many of the cleanup problems. In the past three years, DOE's Office of Environmental Management (EM), often spurred by congressional action, has begun to trim costs and accomplish more. New measures have been introduced to improve contract efficiency, better utilize existing remediation technologies, renegotiate compliance agreements, and begin basic research. Environmental Management Assistant Undersecretary Alvin Alm, appointed in May 1996, is seeking to solidify these changes into an ambitious plan to clean up most of DOE's 130 sites by 2006. But there are widespread doubts that EM has the money, skill, and will to turn itself around. There are also concerns that, in the name of efficiency and economy, EM may be negotiating lower cleanup standards and postponing some difficult cleanup tasks. This article discusses these issues. 7 refs

  17. Mechanism involved in trichloroethylene-induced liver cancer: Importance to environmental cleanup. 1997 annual progress report

    International Nuclear Information System (INIS)

    Bull, R.J.

    1997-01-01

    'The Pacific Northwest National Lab. was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996. This section gives a summary of how each grant is addressing significant DOE cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is primarily focused in three areas-Tank Waste Remediation, Soil and Groundwater Cleanup, and Health Effects.'

  18. Mechanism involved in trichloroethylene-induced liver cancer: Importance to environmental cleanup. 1997 annual progress report

    Energy Technology Data Exchange (ETDEWEB)

    Bull, R.J.

    1997-06-01

    'The Pacific Northwest National Lab. was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996. This section gives a summary of how each grant is addressing significant DOE cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is primarily focused in three areas-Tank Waste Remediation, Soil and Groundwater Cleanup, and Health Effects.'

  19. Hot gas cleanup test facility for gasification and pressurized combustion. Quarterly technical progress report, July 1--September 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source; hot Gas Cleanup Units to mate to all gas streams; and Combustion Gas Turbine. Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  20. Deep vadose zone remediation: technical and policy challenges, opportunities, and progress in achieving cleanup endpoints

    International Nuclear Information System (INIS)

    Wellman, D.M.; Freshley, M.D.; Truex, M.J.; Lee, M.H.

    2013-01-01

    Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical. Use of risk-informed alternate endpoints provides a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable the establishment of a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment that integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system-based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches. (authors)

  1. Deep vadose zone remediation: technical and policy challenges, opportunities, and progress in achieving cleanup endpoints

    Energy Technology Data Exchange (ETDEWEB)

    Wellman, D.M.; Freshley, M.D.; Truex, M.J.; Lee, M.H. [Pacific Northwest National Laboratory, Richland, Washington (United States)

    2013-07-01

    Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical. Use of risk-informed alternate endpoints provides a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable the establishment of a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment that integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system-based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches. (authors)

  2. Architecture synthesis basis for the Hanford Cleanup system: First issue

    International Nuclear Information System (INIS)

    Holmes, J.J.

    1994-06-01

    This document describes a set of candidate alternatives proposed to accomplish the Hanford Cleanup system functions defined in a previous work. Development of alternatives is part of a sequence of system engineering activities which lead to definition of all the products which, when completed, accomplish the cleanup mission. The alternative set is developed to functional level four or higher depending on need

  3. Helping with the clean-up

    International Nuclear Information System (INIS)

    Peelle, E.

    1990-01-01

    Successes in public involvement efforts for nuclear waste management are so few that they deserve careful documentation and analysis. This paper chronicles the goals, process, problems and outcomes of one such success, the Northwest Defense Waste Citizens Forum (CF), created by the DOE-Richland manager in 1986 to advise DOE on its plans for nuclear waste disposal and cleanup of the Hanford site n eastern Washington state. In the evolving, often-controversial, highly-visible area of agency-public interactions, citizen task forces (TFs) have been shown to be useful in developing public policy at the local level. Making them work at the state level is more problematic. This case shows that a diverse, two-state citizen group can make significant contributions to complex EIS evaluations with heavy technical components. The CFs principal contribution to public policy was communication of its findings to business and professional groups, to area political representatives and state agencies, thereby laying the ground work for refocusing the Northwest upon the need for action on DW cleanup at Hanford. In going well beyond NEPA requirements for public involvement in agency decision making, DOE-Richland demonstrated innovative ways of dealing with the difficult issues of public confidence and public trust by means of agency openness, responsiveness to citizen needs for information, and good faith two-way communication. The success of this pro-active DOE initiative was due to many factors including selecting the right issue (existing wastes), structuring the CF at a broad, regional level, and intensive implementation of trust-building strategies

  4. Tritium research laboratory cleanup and transition project final report

    International Nuclear Information System (INIS)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project's multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition

  5. Cleanup criteria for the West Valley demonstration project

    International Nuclear Information System (INIS)

    Parrott, J.D.

    1999-01-01

    The US Nuclear Regulatory Commission (NRC) is prescribing decontamination and decommissioning (cleanup) criteria for the West Valley Demonstration Project and the West Valley, New York, site. The site is contaminated with various forms of residual radioactive contamination and contains a wide variety of radioactive waste. The NRC is planning to issue cleanup criteria for public comment in Fall 1999. Due to the complexity of the site, and the newness of NRC's cleanup criteria policy, applying NRC's cleanup criteria to this site will be an original regulatory undertaking. (author)

  6. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1997, mid-year progress report

    International Nuclear Information System (INIS)

    1997-06-01

    The Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996. This report gives a summary of how each grant is addressing significant DOE cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is primarily focused in three areas--Tank Waste Remediation, Soil and Groundwater Cleanup, and Health Effects

  7. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1997 mid-year progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996. This report gives a summary of how each grant is addressing significant DOE cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is primarily focused in three areas--Tank Waste Remediation, Soil and Groundwater Cleanup, and Health Effects.

  8. Technical issues for WIPP

    International Nuclear Information System (INIS)

    Hunter, T.O.

    1979-01-01

    Emplacement of wastes in the WIPP will include experiments on various waste types which will provide essential data on waste-rock interaction and repository response. These experiments will include evolution of the synergistic effects of both heat production, radiation, and actual waste forms. While these studies will provide essential data on the validity of waste isolation in bedded salt, they will be preceded by a broad-based experimental program which will resolve many of the current technical issues providing not only an assessment of the safety of performing such experiments but also the technical basis for assurance that the appropriate experiments are performed. Data and predictive modeling techniques, which are currently available, can bound the consequences associated with these technical issues. Predictions of the impact on public safety based on these analyses indicate that safe waste disposal in WIPP salt beds is achievable; however, a major use of WIPP will be to conduct realistic experiments with HLW forms to address some of the unresolved details of these waste/salt interactions

  9. Potential impact of licensee default on cleanup of TMI-2. Technical report

    International Nuclear Information System (INIS)

    Roberts, J.O.; Saltzman, J.

    1980-11-01

    Financial repercussions of the accident at Three Mile Island Unit 2 on the ability of the Licensee, Metropolitan Edison Co., to complete cleanup of the facility are examined. Potential impacts of licensee default on cleanup and alternatives to minimize the potential of bankruptcy are discussed. Specific recommendations are made regarding steps the Nuclear Regulatory Commission might take in keeping with its regulatory functions and its mission to protect the public health and safety

  10. Needs for Risk Informing Environmental Cleanup Decision Making - 13613

    International Nuclear Information System (INIS)

    Zhu, Ming; Moorer, Richard

    2013-01-01

    This paper discusses the needs for risk informing decision making by the U.S. Department of Energy (DOE) Office of Environmental Management (EM). The mission of the DOE EM is to complete the safe cleanup of the environmental legacy brought about from the nation's five decades of nuclear weapons development and production and nuclear energy research. This work represents some of the most technically challenging and complex cleanup efforts in the world and is projected to require the investment of billions of dollars and several decades to complete. Quantitative assessments of health and environmental risks play an important role in work prioritization and cleanup decisions of these challenging environmental cleanup and closure projects. The risk assessments often involve evaluation of performance of integrated engineered barriers and natural systems over a period of hundreds to thousands of years, when subject to complex geo-environmental transformation processes resulting from remediation and disposal actions. The requirement of resource investments for the cleanup efforts and the associated technical challenges have subjected the EM program to continuous scrutiny by oversight entities. Recent DOE reviews recommended application of a risk-informed approach throughout the EM complex for improved targeting of resources. The idea behind this recommendation is that by using risk-informed approaches to prioritize work scope, the available resources can be best utilized to reduce environmental and health risks across the EM complex, while maintaining the momentum of the overall EM cleanup program at a sustainable level. In response to these recommendations, EM is re-examining its work portfolio and key decision making with risk insights for the major sites. This paper summarizes the review findings and recommendations from the DOE internal reviews, discusses the needs for risk informing the EM portfolio and makes an attempt to identify topics for R and D in integrated

  11. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report

    International Nuclear Information System (INIS)

    1998-05-01

    Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects

  12. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects.

  13. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  14. Needs for Risk Informing Environmental Cleanup Decision Making - 13613

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Ming; Moorer, Richard [U.S. Department of Energy, Washington, DC 20585 (United States)

    2013-07-01

    This paper discusses the needs for risk informing decision making by the U.S. Department of Energy (DOE) Office of Environmental Management (EM). The mission of the DOE EM is to complete the safe cleanup of the environmental legacy brought about from the nation's five decades of nuclear weapons development and production and nuclear energy research. This work represents some of the most technically challenging and complex cleanup efforts in the world and is projected to require the investment of billions of dollars and several decades to complete. Quantitative assessments of health and environmental risks play an important role in work prioritization and cleanup decisions of these challenging environmental cleanup and closure projects. The risk assessments often involve evaluation of performance of integrated engineered barriers and natural systems over a period of hundreds to thousands of years, when subject to complex geo-environmental transformation processes resulting from remediation and disposal actions. The requirement of resource investments for the cleanup efforts and the associated technical challenges have subjected the EM program to continuous scrutiny by oversight entities. Recent DOE reviews recommended application of a risk-informed approach throughout the EM complex for improved targeting of resources. The idea behind this recommendation is that by using risk-informed approaches to prioritize work scope, the available resources can be best utilized to reduce environmental and health risks across the EM complex, while maintaining the momentum of the overall EM cleanup program at a sustainable level. In response to these recommendations, EM is re-examining its work portfolio and key decision making with risk insights for the major sites. This paper summarizes the review findings and recommendations from the DOE internal reviews, discusses the needs for risk informing the EM portfolio and makes an attempt to identify topics for R and D in

  15. The TMI-2 clean-up project collection and databases

    International Nuclear Information System (INIS)

    Osif, B.A.; Conkling, T.W.

    1996-01-01

    A publicly accessible collection containing several thousand of the videotapes, photographs, slides and technical reports generated during the clean-up of the TMI-2 reactor has been established by the Pennsylvania State University Libraries. The collection is intended to serve as a technical resource for the nuclear industry as well as the interested public. Two Internet-searchable databases describing the videotapes and technical reports have been created. The development and use of these materials and databases are described in this paper. (orig.)

  16. Development of a risk-based approach to Hanford Site cleanup

    International Nuclear Information System (INIS)

    Hesser, W.A.; Daling, P.M.; Baynes, P.A.

    1995-06-01

    In response to a request from Mr. Thomas Grumbly, Assistant Secretary of Energy for Environmental Management, the Hanford Site contractors developed a conceptual set of risk-based cleanup strategies that (1) protect the public, workers, and environment from unacceptable risks; (2) are executable technically; and (3) fit within an expected annual funding profile of 1.05 billion dollars. These strategies were developed because (1) the US Department of Energy and Hanford Site budgets are being reduced, (2) stakeholders are dissatisfied with the perceived rate of cleanup, (3) the US Congress and the US Department of Energy are increasingly focusing on risk and riskreduction activities, (4) the present strategy is not integrated across the Site and is inconsistent in its treatment of similar hazards, (5) the present cleanup strategy is not cost-effective from a risk-reduction or future land use perspective, and (6) the milestones and activities in the Tri-Party Agreement cannot be achieved with an anticipated funding of 1.05 billion dollars annually. The risk-based strategies described herein were developed through a systems analysis approach that (1) analyzed the cleanup mission; (2) identified cleanup objectives, including risk reduction, land use, and mortgage reduction; (3) analyzed the existing baseline cleanup strategy from a cost and risk perspective; (4) developed alternatives for accomplishing the cleanup mission; (5) compared those alternatives against cleanup objectives; and (6) produced conclusions and recommendations regarding the current strategy and potential risk-based strategies

  17. Post-accident cleanup of radioactivity at the Three Mile Island Nuclear Power Station

    International Nuclear Information System (INIS)

    Brooksbank, R.E.; Armento, W.J.

    1980-02-01

    The technical staff of the President's Commission on the Accident at Three Mile Island (TMI) requested that Oak Ridge National Laboratory (ORNL) prepare documentation concerned with the cleanup of radioactivity on the Three Mile Island site following the March 28, 1979 accident. The objective of this report is to provide information in a summarized form, which will be of direct usefulness to the commissioners. The information contained herein includes discussion of on-site assistance and accomplishments following the accident, flowsheet development for the TMI recovery team (by the Technical Advisory Group), and the numerous reports already generated on the TMI cleanup and recovery

  18. Technical papers presented at a DOE meeting on criteria for cleanup of transuranium elements in soil

    International Nuclear Information System (INIS)

    1984-09-01

    Transuranium element soil contamination cleanup experience gained from nuclear weapons accidents and cleanup at Eniwetok Atoll was reviewed. Presentations have been individually abstracted for inclusion in the data base

  19. Hanford: A Conversation About Nuclear Waste and Cleanup

    International Nuclear Information System (INIS)

    Gephart, Roy E.

    2003-01-01

    The author takes us on a journey through a world of facts, values, conflicts, and choices facing the most complex environmental cleanup project in the United States, the U.S. Department of Energy's Hanford Site. Starting with the top-secret Manhattan Project, Hanford was used to create tons of plutonium for nuclear weapons. Hundreds of tons of waste remain. In an easy-to-read, illustrated text, Gephart crafts the story of Hanford becoming the world's first nuclear weapons site to release large amounts of contaminants into the environment. This was at a time when radiation biology was in its infancy, industry practiced unbridled waste dumping, and the public trusted what it was told. The plutonium market stalled with the end of the Cold War. Public accountability and environmental compliance ushered in a new cleanup mission. Today, Hanford is driven by remediation choices whose outcomes remain uncertain. It's a story whose epilogue will be written by future generations. This book is an information resource, written for the general reader as well as the technically trained person wanting an overview of Hanford and cleanup issues facing the nuclear weapons complex. Each chapter is a topical mini-series. It's an idea guide that encourages readers to be informed consumers of Hanford news, to recognize that knowledge, high ethical standards, and social values are at the heart of coping with Hanford's past and charting its future. Hanford history is a window into many environmental conflicts facing our nation; it's about building upon success and learning from failure. And therein lies a key lesson, when powerful interests are involved, no generation is above pretense. Roy E. Gephart is a geohydrologist and senior program manager at the Pacific Northwest National Laboratory, Richland, Washington. He has 30 years experience in environmental studies and the nuclear waste industry

  20. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards -- Fiscal Year 2002 Mid-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Bredt, Paul R.; Ainsworth, Calvin C.; Brockman, Fred J.; Camaioni, Donald M.; Egorov, Oleg B.; Felmy, Andrew R.; Gorby, Yuri A.; Grate, Jay W.; Greenwood, Margaret S.; Hay, Benjamin P.; Hess, Nancy J.; Hubler, Timothy L.; Icenhower, Jonathan P.; Mattigod, Shas V.; McGrail, B. Peter; Meyer, Philip D.; Murray, Christopher J.; Panetta, Paul D.; Pfund, David M.; Rai, Dhanpat; Su, Yali; Sundaram, S. K.; Weber, William J.; Zachara, John M.

    2002-06-11

    Pacific Northwest National Laboratory has been awarded a total of 80 Environmental Management Science Program (EMSP) research grants since the inception of the program in 1996. The Laboratory has collaborated on an additional 14 EMSP awards with funding received through other institution. This report describes how each of the projects awarded in 1999, 2000, and 2001 addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in the individual project reports included in this document. Projects are under way in three main areas: Tank Waste Remediation, Decontamination and Decommissioning, and Soil and Groundwater Cleanup.

  1. Regulatory and institutional issues impending cleanup at US Department of Energy sites: Perspectives gained from an office of environmental restoration workshop

    Energy Technology Data Exchange (ETDEWEB)

    Fallon, W E; Gephart, J M; Gephart, R E; Quinn, R D; Stevenson, L A

    1991-05-01

    The US Department of Energy's (DOE) nuclear weapons and energy operations are conducted across a nation-wide industrial complex engaged in a variety of manufacturing, processing, testing, and research and development activities. The overall mission of DOE Office of Environmental Restoration and Waste Management (EM) is to protect workers, the public, and the environment from waste materials generated by past, current, and future DOE activities and to bring the DOE complex into compliance with all applicable laws, regulations, and agreements related to health, safety, and the environment. EM addresses this broad mandate through related and interdependent programs that include corrective actions, waste operations, environmental restoration, and technology development. The EM Office of Environmental Restoration (EM-40) recognizes the importance of implementing a complex-wide process to identify and resolve those issues that may impede progress towards site cleanup. As a first step in this process, FM-40 sponsored an exercise to identify and characterize major regulatory and institutional issues and to formulate integrated action steps towards their resolution. This report is the first product of that exercise. It is intended that the exercise described here will mark the beginning of an ongoing process of issue identification, tracking, and resolution that will benefit cleanup activities across the DOE complex.

  2. The Approach to Cleanup at West Cumbria's Nuclear Sites

    International Nuclear Information System (INIS)

    Price, T.

    2006-01-01

    The cleanup of West Cumbria's nuclear sites is one of the most important and demanding managerial, technical and environmental challenges facing the UK over the next century. Considerable progress has already been made in cleaning up the Sellafield, Calder Hall, and Low-level Waste Repository (LLWR) sites but there remains significant challenge ahead. There are more than 200 nuclear facilities at the sites including redundant fuel storage ponds, redundant chemical plants and silos of solid waste and sludge. These legacy buildings exist alongside commercially operating reprocessing and fuel fabrication facilities. They are all linked together by a complex network of services including gas supplies, water supplies, waste disposal routes, and chemical supply routes. Many of the buildings requiring cleanup are very old and date back to the early years of the British nuclear industry. They were not designed with decommissioning in mind, and some require substantial improvement to provide a safe foundation from which to retrieve waste and decommission. The cleanup of these legacy facilities must be carefully balanced with the ongoing operations that provide services to commercial customers. Cleanup must be carried out safely and efficiently, without impacting upon commercial operations whose revenue is vital to funding the Cleanup organizations scope of work. This paper will introduce the cleanup approach at West Cumbria's Sellafield nuclear site. It will provide an overview of what is being done in preparation to meet the formidable but rewarding challenge ahead. (authors)

  3. Oiling and cleanup issues in wetlands, M/T Julie N spill, Portland, Maine

    International Nuclear Information System (INIS)

    Michel, J.; Lehmann, S.M.; Henry, C.B.Jr.

    1998-01-01

    The clean up and environmental assessment techniques which were used following the September 1996 oil spill from the M/T Julie N in Portland Harbor, Maine were reviewed and documented. The spill resulted in heavy oiling of wetland. Aerial photography, ground-truth surveys, transects and chemical sampling were conducted to try to assess the impact to wetlands and to decide on appropriate cleanup options. A range of cleanup methods were attempted including low-pressure flushing, shoreline cleaning agents, vegetation cutting, and natural recovery. 9 refs., 3 tabs., 1 fig

  4. Post-accident cleanup and decommissioning of a reference pressurized-water reactor

    International Nuclear Information System (INIS)

    Murphy, E.S.; Holter, G.M.

    1982-10-01

    This paper summarizes the results of a conceptual study to evaluate the technical requirements, costs, and safety impacts of the cleanup and decommissioning of a large pressurized water reactor (PWR) involved in an accident. The costs and occupational doses for post-accident cleanup and dcommissioning are estimated to be substantially higher than those for decommissioning following the orderly shutdown of a reactor. A major factor in these cost and occupational dose increases is the high radiation environment that exists in the containment building following an accident which restricts worker access and increases the difficulty of performing certain tasks. Other factors which influence accident cleanup and decommissioning costs are requirements for the design and construction of special tools and equipment, increased requirements for regulatory approvals, and special waste management needs. Radiation doses to the public from routine accident cleanup and decommissioning operations are estimated to be below permissible radiation dose levels in unrestricted areas and within the range of annual doses from normal background

  5. Large Water Cherenkov Detectors - Technical Issues -

    CERN Document Server

    Aihara, H

    2010-01-01

    We address technical issues and challenges to construct a one-megaton scale water Cherenkov detector for neutrino detection. Studies presented here are mostly based on preliminary work for Hyper Kamiokande project.

  6. Current technical issues in international safeguards

    International Nuclear Information System (INIS)

    Bennett, C.A.

    1977-01-01

    Safeguards systems, and the associated need for technical and systems development, reflect changing conditions and concerns associated with the nuclear fuel cycle and the safety and security of nuclear materials and facilities. In particular, the implementation of international safeguards has led to the recognition of certain technical issues, both old and new, which are in need of resolution. These are: 1. The grading of nuclear materials and facilities with respect to their relative safeguards significance. 2. The extension and upgrading of safeguards techniques to maintain adequate protection in view of constantly increasing amounts of material to be safeguarded. 3. The balance between safeguards mechanisms based on physical protection and material accounting, and the role of surveillance and containment in each case. 4. The role of information systems as a basis for both analytical feedback and the determination of the factors affecting system effectiveness and their interrelationship. 5. A determination of the degree to which the overall technical effectiveness of international inspection activities can be quantified. Each of these technical issues must be considered in light of the specific objectives of international safeguards, which differ from domestic safeguards in terms of the level of the threat, the safeguards mechanisms available, and the diversion strategies assumed. Their resolution in this international context is essential if the effectiveness and viability of international safeguards are to be maintained

  7. Science To Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards; FINAL

    International Nuclear Information System (INIS)

    Bredt, Paul R; Brockman, Fred J; Grate, Jay W; Hess, Nancy J; Meyer, Philip D; Murray, Christopher J; Pfund, David M; Su, Yali; Thornton, Edward C; Weber, William J; Zachara, John M

    2001-01-01

    Pacific Northwest National Laboratory (PNNL) was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, nine in fiscal year 1998, seven in fiscal year 1999, and five in fiscal year 2000. All of the fiscal year 1996 award projects have published final reports. The 1997 and 1998 award projects have been completed or are nearing completion. Final reports for these awards will be published, so their annual updates will not be included in this document. This section summarizes how each of the 1999 and 2000 grants address significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. The 1999 and 2000 EMSP awards at PNNL are focused primarily in two areas: Tank Waste Remediation, and Soil and Groundwater Cleanup

  8. Post-accident cleanup and decommissioning of a reference pressurized water reactor

    International Nuclear Information System (INIS)

    Murphy, E.S.; Holter, G.M.

    1982-01-01

    This paper summarizes the results of a conceptual study to evaluate the technical requirements, costs, and safety impacts of the cleanup and decommissioning of a large pressurized water reactor (PWR) involved in an accident. The costs and occupational doses for post-accident cleanup and decommissioning are estimated to be substantially higher than those for decommissioning following the orderly shutdown of a reactor. A major factor in these cost and occupational dose increases is the high radiation environment that exists in the containment building following an accident which restricts worker access and increases the difficulty of performing certain tasks. Other factors which influence accident cleanup and decommissioning costs are requirements for the design and construction of special tools and equipment, increased requirements for regulatory approvals, and special waste management needs. Radiation doses to the public from routine accident cleanup and decommissioning operations are estimated to be below permissible radiation dose levels in unrestricted areas and within the range of annual doses from normal background. 6 references, 1 figure, 7 tables

  9. Worker Safety and Health Issues Associated with the DOE Environmental Cleanup Program: Insights From the DOE Laboratory Directors' Environmental and Occupational/Public health Standards Steering Group

    International Nuclear Information System (INIS)

    M.C. Edelson; Samuel C. Morris; Joan M. Daisey

    2001-01-01

    The U.S. Department of Energy (DOE) Laboratory Directors' Environmental and Occupational/Public Health Standards Steering Group (or ''SSG'') was formed in 1990. It was felt then that ''risk'' could be an organizing principle for environmental cleanup and that risk-based cleanup standards could rationalize clean up work. The environmental remediation process puts workers engaged in cleanup activities at risk from hazardous materials and from the more usual hazards associated with construction activities. In a real sense, the site remediation process involves the transfer of a hypothetical risk to the environment and the public from isolated contamination into real risks to the workers engaged in the remediation activities. Late in its existence the SSG, primarily motivated by its LANL representative, Dr. Harry Ettinger, actively investigated issues associated with worker health and safety during environmental remediation activities. This paper summarizes the insights noted by the SSG. Most continue to be pertinent today

  10. Mold: Cleanup and Remediation

    Science.gov (United States)

    ... National Center for Environmental Health (NCEH) Cleanup and Remediation Recommend on Facebook Tweet Share Compartir On This ... CDC and EPA on mold cleanup, removal and remediation. Cleanup information for you and your family Homeowner’s ...

  11. Consolidating federal facility cleanup: Some pros and cons

    International Nuclear Information System (INIS)

    Raynes, D.B.; Boss, G.R.

    1993-01-01

    It has been suggested that Congress establish a permanent, full-time, independent national commission for radioactive waste management activities at DOE's Nuclear Weapons Complex. DOE regulates certain aspects of its treatment, storage, and disposal of radioactive waste by orders that are not promulgated by ''notice and comment'' or other procedures in the Administration Procedures Act. Because many agencies are not legally and technologically structured to handle their own cleanup problems, these activities might be conducted by one entity that can share information and staff among these agencies. There are rational arguments for both sides of this issue. Some of the advantages of such an organization include: focusing Congress's attention on an integrated federal facility cleanup instead of a fragmented, agency by agency approach, and an ability to prioritize cleanup decisions among agencies. Some significant obstacles include: reluctance by Congress and the executive branch to create any new bureaucracy at a time of budget deficits, and a loss of momentum from the progress already being made by the agencies. Given that more than $9 billion was proposed for FY 93 alone for federal facilities' cleanup programs and that decades will pass before all problems are addressed, it is appropriate to consider new approaches to environmental cleanup. This paper begins the dialogue about new ways to improve decision-making and government spending

  12. Issues involved in translating technical texts from English into ...

    African Journals Online (AJOL)

    Issues involved in translating technical texts from English into Northern Sotho. ... some of the problems encountered by the translator, such as the lack of equivalent technical terms in the target language. ... AJOL African Journals Online.

  13. Technical review of externalities issues. Final report

    International Nuclear Information System (INIS)

    Niemeyer, V.

    1994-12-01

    Externalities has become the catchword for a major experiment in electric utility regulation. Together with increased competition as a means for economic regulation, this experiment represents a potential revolution in how electric utilities are regulated. It is very important for utilities and policy makers to understand the technical issues and arguments driving the externality experiment. This Technical Review presents four papers covering topics in economics that may play important roles in this revolution. The four papers are: Economic Issues in the Application of Externalities to Electricity Resource Selection; Climate Change, the Marginal Cost of Carbon Dioxide Emissions and the Implications for Carbon Dioxide Emissions Adders; Positive Externalities and Benefits from Electricity; and Socioeconomic Effects of Externality Adders for Electric Utility Emissions

  14. Development of a new chemical technology for cleanup of VVER steam generators

    International Nuclear Information System (INIS)

    Smykov, V.B.; Yermolaev, N.P.; Ivanov, V.N.

    2002-01-01

    As shows the maintenance experience of SG's, the long-time maintenance them without chemical cleanup on secondary-side results in accumulation of considerable amounts of depositions of oxides of iron with a high content of copper on outside of tubes. The deposit accumulation creates conditions for concentrating of salts which promote corrosion and, then, the loosing of inter-contour tightness. Therefore the experts do not have any doubts in necessity of chemical cleanups and the chemical cleanups were carried out at some NPP's with VVER during last years. However it is possible to say, that these cleanups were carried out not by the best mode - the same main reagents had been used in order to dissolve the copper and iron oxides. For example, all cleanups at Balakovo NPP in 1996-1997 years had the common deficiency - even during 5. final stage of process the copper prolongs to be washed. By our opinion, the reasons of it are the poor scientific and technical justification of this process. Therefore at various NPP's with VVER cleanups realize by various techniques. The process of chemical cleanup, close to offered in the present work, was repeated many times utilized at BN-600 Belojarsk NPP and at BN-350 Shevtchenko NPP. The purposes of the present work are: 1. Research the behaviours of physicochemical processes during dissolution of components of depositions and their mixtures with use of the various formulas; 2. Analysis of the carried out chemical cleanups of PGV-1000M at an example of Balakovo NPP; 3. Development of a new process of SG's cleanup on the base of experimental researches and analysis; 4. Check of this process on the samples of full-scale depositions from SG Balakovo NPP. (authors)

  15. Hanford Cleanup... Restore the Columbia River Corridor Transition the Central Plateau Prepare and Plan for the End State

    International Nuclear Information System (INIS)

    Klein, Keith A.

    2006-01-01

    The U.S. Department of Energy's (DOE) Hanford Site in southeastern Washington State was established during World War II to produce plutonium for nuclear weapons as part of the top-secret Manhattan Project. In 1989, Hanford's mission changed to cleanup and closure; today the site is engaged in one of the world's largest and most aggressive programs to clean up radioactive and hazardous wastes. The size and complexity of Hanford's environmental problems are made even more challenging by the overlapping technical, political, regulatory, financial and cultural issues associated with the cleanup. The physical challenges at the Hanford Site are daunting. More than 50 million gallons of liquid radioactive waste in 177 underground storage tanks; 2,300 tons of spent nuclear fuel;12 tons of plutonium in various forms; 25 million cubic feet of buried or stored solid waste; 270 billion gallons of groundwater contaminated above drinking-water standards spread out over about 80 square miles; more than 1,700 waste sites; and approximately 500 contaminated facilities. With a workforce of approximately 7,000 and a budget of about $1.8 billion dollars this fiscal year, Hanford cleanup operations are expected to be complete by 2035, at a cost of $60 billion dollars. (authors)

  16. Historical research in the Hanford site waste cleanup

    International Nuclear Information System (INIS)

    Gerber, Michele S.

    1992-01-01

    This paper will acquaint the audience with role of historical research in the Hanford Site waste cleanup - the largest waste cleanup endeavor ever undertaken in human history. There were no comparable predecessors to this massive waste remediation effort, but the Hanford historical record can provide a partial road map and guide. It can be, and is, a useful tool in meeting the goal of a successful, cost-effective, safe and technologically exemplary waste cleanup. The Hanford historical record is rich and complex. Yet, it poses difficult challenges, in that no central and complete repository or data base exists, records contain obscure code words and code numbers, and the measurement systems and terminology used in the records change many times over the years. Still, these records are useful to the current waste cleanup in technical ways, and in ways that extend beyond a strictly scientific aspect. Study and presentations of Hanford Site history contribute to the huge educational and outreach tasks of helping the Site's work force deal with 'culture change' and become motivated for the cleanup work that is ahead, and of helping the public and the regulators to place the events at Hanford in the context of WWII and the Cold War. This paper traces historical waste practices and policies as they changed over the years at the Hanford Site, and acquaints the audience with the generation of the major waste streams of concern in Hanford Site cleanup today. It presents original, primary-source research into the waste history of the Hanford Site. The earliest, 1940s knowledge base, assumptions and calculations about radioactive and chemical discharges, as discussed in the memos, correspondence and reports of the original Hanford Site (then Hanford Engineer Works) builders and operators, are reviewed. The growth of knowledge, research efforts, and subsequent changes in Site waste disposal policies and practices are traced. Examples of the strengths and limitations of the

  17. Reactor water clean-up device

    International Nuclear Information System (INIS)

    Tanaka, Koji; Egashira, Yasuo; Shimada, Fumie; Igarashi, Noboru.

    1983-01-01

    Purpose: To save a low temperature reactor water clean-up system indispensable so far and significantly simplify the system by carrying out the reactor water clean-up solely in a high temperature reactor water clean-up system. Constitution: The reactor water clean-up device comprises a high temperature clean-up pump and a high temperature adsorption device for inorganic adsorbents. The high temperature adsorption device is filled with amphoteric ion adsorbing inorganic adsorbents, or amphoteric ion adsorbing inorganic adsorbents and anionic adsorbing inorganic adsorbents. The reactor water clean-up device introduces reactor water by the high temperature clean-up pump through a recycling system to the high temperature adsorption device for inorganic adsorbents. Since cations such as cobalt ions and anions such as chlorine ions in the reactor water are simultaneously removed in the device, a low temperature reactor water clean-up system which has been indispensable so far can be saved to realize the significant simplification for the entire system. (Seki, T.)

  18. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    International Nuclear Information System (INIS)

    CD Carlson; SQ Bennett

    2000-01-01

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998, and seven in fiscal year 1999. All of the fiscal year 1996 award projects have been completed and will publish final reports, so their annual updates will not be included in this document. This section summarizes how each of the currently funded grants addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation; Decontamination and Decommissioning; Spent Nuclear Fuel and Nuclear Materials; and Soil and Groundwater Cleanup

  19. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Clark D.; Bennett, Sheila Q.

    2000-07-25

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998 and seven in fiscal year 1999.(a) All of the fiscal year 1996 awards have been completed and the Principal Investigators are writing final reports, so their summaries will not be included in this document. This section summarizes how each of the currently funded grants addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, and Soil and Groundwater Cleanup.

  20. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    CD Carlson; SQ Bennett

    2000-07-25

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998, and seven in fiscal year 1999. All of the fiscal year 1996 award projects have been completed and will publish final reports, so their annual updates will not be included in this document. This section summarizes how each of the currently funded grants addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation; Decontamination and Decommissioning; Spent Nuclear Fuel and Nuclear Materials; and Soil and Groundwater Cleanup.

  1. Worker Safety and Health Issues Associated with the DOE Environmental Cleanup Program: Insights From the DOE Laboratory Directors' Environmental and Occupational/Public health Standards Steering Group

    Energy Technology Data Exchange (ETDEWEB)

    M.C. Edelson; Samuel C. Morris; Joan M. Daisey

    2001-03-01

    The U.S. Department of Energy (DOE) Laboratory Directors' Environmental and Occupational/Public Health Standards Steering Group (or ''SSG'') was formed in 1990. It was felt then that ''risk'' could be an organizing principle for environmental cleanup and that risk-based cleanup standards could rationalize clean up work. The environmental remediation process puts workers engaged in cleanup activities at risk from hazardous materials and from the more usual hazards associated with construction activities. In a real sense, the site remediation process involves the transfer of a hypothetical risk to the environment and the public from isolated contamination into real risks to the workers engaged in the remediation activities. Late in its existence the SSG, primarily motivated by its LANL representative, Dr. Harry Ettinger, actively investigated issues associated with worker health and safety during environmental remediation activities. This paper summarizes the insights noted by the SSG. Most continue to be pertinent today.

  2. Methods for assessing environmental impacts of a FUSRAP property-cleanup/interim-storage remedial action

    International Nuclear Information System (INIS)

    Wyman, D.J.

    1982-12-01

    This document provides a description of a property-cleanup/interim-storage action, explanation of how environmental impacts might occur, comprehensive treatment of most potential impacts that might occur as a result of this type of action, discussion of existing methodologies for estimating and assessing impacts, justification of the choice of specific methodologies for use in FUSRAP environmental reviews, assessments of representative impacts (or expected ranges of impacts where possible), suggested mitigation measures, and some key sources of information. The major topical areas covered are physical and biological impacts, radiological impacts, and socioeconomic impacts. Some project-related issues were beyond the scope of this document, including dollar costs, specific accident scenarios, project funding and changes in Congressional mandates, and project management (contracts, labor relations, quality assurance, liability, emergency preparedness, etc.). These issues will be covered in other documents supporting the decision-making process. Although the scope of this document covers property-cleanup and interim-storage actions, it is applicable to other similar remedial actions. For example, the analyses discussed herein for cleanup activities are applicable to any FUSRAP action that includes site cleanup

  3. Lessons learned at TMI: cleanup for respiratory protection

    International Nuclear Information System (INIS)

    Parfitt, B.A.; Gee, E.F.

    1987-01-01

    The March 28, 1979, accident at Three Mile Island Unit 2 (TMI-2) presented GPU Nuclear with technical challenges unprecedented in the nuclear power industry. Among these challenges were a myriad of health physics problems that had to be solved to ensure a radiologically safe environment for workers performing cleanup activities. The application of the as-low-as-reasonably-achievable (ALARA) philosophy has been a fundamental aspects in protecting cleanup workers. The unique conditions produced by the accident, however, have necessitated novel and innovative approaches in making this philosophy effective. The option to use respirators is based on which method will result in the lowest radiation dose to the worker. Inherent to this program has been the training of workers to overcome the perception that any internal contamination is of foremost concern and is orders of magnitude greater in biological effect than an identical external dose. It is, of course, the total dose (internal dose plus external dose) that must be minimized to implement a true ALARA philosophy. The need for considering the total radiation dose when making decisions to use respirators has been clear during the TMI-2 cleanup. Prescribing respirators is not always good for the ALARA concept

  4. Development of a risk-based approach to Hanford site cleanup

    International Nuclear Information System (INIS)

    Hesser, W.A.

    1996-01-01

    In response to a request from Mr. Thomas Grumbly, Assistant Secretary of Energy for Environmental Management, the Hanford Site contractors developed a set of risk-based cleanup strategies that (1) protect the public, workers, and environment from unacceptable risks; (2) are executable technically; and (3) fit within currently expected annual funding profiles. These strategies were developed because (1) the U.S. Department of Energy and Hanford Site budgets are being reduced, (2) stakeholders are dissatisfied with the perceived rate of cleanup, (3) the U.S. Congress and the U.S. Department of Energy are increasingly focusing on risk and risk-reduction activities, (4) the present strategy is not integrated across the Site and is inconsistent in its treatment of similar hazards, (5) the present cleanup strategy is not cost-effective from a risk-reduction or future land use perspective, and (6) the milestones and activities in the Tri-Party Agreement cannot be achieved with an anticipated funding of 1.05 billion dollars, or less, annually. This analysis produced a framework and a set of tools that are available for dealing with changes to anticipated funding levels, changes in risk cleanup standards, and Congressional initiatives and inquiries. The tools include land-supply curves, cost profiles, risk profiles, mortgage reduction curves, and minimum operations costs. This paper describes the methodology used to develop mortgage-based, risk-based, and land-based cleanup strategies and how those strategies differ in terms of the work to be performed, its sequence, and the resulting end states

  5. Technical issues associated with in situ vitrification of the INEL Subsurface Disposal Area

    International Nuclear Information System (INIS)

    Stoots, C.M.; Bates, S.O.; Callow, R.A.; Campbell, K.A.; Farnsworth, R.K.; Gratson, G.K.; McKellar, M.G.; Nickelson, D.F.; Slater, C.E.

    1992-01-01

    In situ vitrification (ISV) has been identified as an alternative technology for remediation of the Acid Pit and Transuranic Pits and Trenches (TRU-PTs) that are present at the Idaho National Engineering Laboratory (INEL) Subsurface Disposal Area (SDA). However, a number of technical issues exist that must be resolved before ISV can be considered applicable to these waste sites. To assist in the ISV technology evaluation, an ISV Steering Committee was formed to identify, prioritize, and develop closure roadmaps for technical issues associated with ISV application at the INEL SDA. The activities of the ISV Steering Committee are summarized in three volumes of this report. Volume 1 identifies the systematic approach used to identify and prioritize the ISV technical issues, and briefly discusses the methodology that will be employed to resolve these issues. This document Volume 2 and Volume 3 discusses each technical issue in greater detail and suggest specific closure roadmaps to be used in resolving technical issues associated with ISV at the SDA Acid Pit and TRU-PTs, respectively

  6. Enabling cleanup technology transfer

    International Nuclear Information System (INIS)

    Ditmars, J. D.

    2002-01-01

    Technology transfer in the environmental restoration, or cleanup, area has been challenging. While there is little doubt that innovative technologies are needed to reduce the times, risks, and costs associated with the cleanup of federal sites, particularly those of the Departments of Energy (DOE) and Defense, the use of such technologies in actual cleanups has been relatively limited. There are, of course, many reasons why technologies do not reach the implementation phase or do not get transferred from developing entities to the user community. For example, many past cleanup contracts provided few incentives for performance that would compel a contractor to seek improvement via technology applications. While performance-based contracts are becoming more common, they alone will not drive increased technology applications. This paper focuses on some applications of cleanup methodologies and technologies that have been successful and are illustrative of a more general principle. The principle is at once obvious and not widely practiced. It is that, with few exceptions, innovative cleanup technologies are rarely implemented successfully alone but rather are implemented in the context of enabling processes and methodologies. And, since cleanup is conducted in a regulatory environment, the stage is better set for technology transfer when the context includes substantive interactions with the relevant stakeholders. Examples of this principle are drawn from Argonne National Laboratory's experiences in Adaptive Sampling and Analysis Programs (ASAPs), Precise Excavation, and the DOE Technology Connection (TechCon) Program. The lessons learned may be applicable to the continuing challenges posed by the cleanup and long-term stewardship of radioactive contaminants and unexploded ordnance (UXO) at federal sites

  7. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster displays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume I covers information presented at sessions 1 through 4 on systems for the production of Co-products and industrial fuel gas, environmental projects, and components and materials. Individual papers have been processed for the Energy Data Base.

  8. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster dsplays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume II covers papers presented at sessions 5 and 6 on system for the production of synthesis gas, and on system for the production of power. All papers have been processed for inclusion in the Energy Data Base.

  9. Vocational technical and adult education: Status, trends and issues related to electronic delivery

    Science.gov (United States)

    Rothenberg, D.

    1973-01-01

    Data are analyzed, and trends and issues are discussed to provide information useful to the systems designer who wishes to identify and assess the opportunities for large scale electronic delivery in vocational/technical and adult education. Issues connected with vocational/technical education are investigated, with emphasis on those issues in the current spotlight which are relevant to the possibilities of electronic delivery. The current role of media is examined in vocational/technical instruction.

  10. A systematic assessment of the state of hazardous waste clean-up technologies. Quarterly technical progress report, April 1--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Berg, M.T.; Reed, B.E.; Gabr, M.

    1993-07-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushing (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.

  11. Waste is a Terrible Thing to Mind: Perspectives on the Cleanup of the United States Nuclear Weapons Complex

    Science.gov (United States)

    Bodde, David

    1997-03-01

    Symposium will address this cleanup from the perspective of contemporary issues, rather than the mistakes of the past. Dr. David Bodde, currently Co-Chair of the Environmental Management Advisory Board, which advises the DoE on technical and policy issues pertaining to the cleanup, will chair the Symposium. Dr. Frank Parker, Distinguished Professor of Environmental and Water Resources Engineering at Vanderbilt University, will provide a general description of these problems and issues, including cultural and historical factors, a technical description of the wastes, and what is physically required for resolution. The Honorable Alvin Alm, Assistant Secretary of Energy for Environmental Management, will describe the current strategy for solving the problem, how this differs from approaches used in the past, what can realistically be accomplished and when and at what cost. Mr. Thomas Winston of the Ohio Environmental Protection Agency, will present the perspective of the affected localities. And Dr. Charles Powers, Executive Director of the Environmental and Occupational Health Sciences Institute, will speak to the current role and future prospects for risk analysis in improving the allocation of resources for cleanup.

  12. Technical issues associated with in situ vitrification of the INEL Subsurface Disposal Area

    International Nuclear Information System (INIS)

    Stoots, C.M.; Bates, S.O.; Callow, R.A.; Campbell, K.A.; Farnsworth, R.K.; Krisman, G.K.; McKellar, M.G.; Nickelson, D.F.; Slater, C.E.

    1992-07-01

    In situ vitrification (ISV) has been identified as an alternative technology for remediation of the acid pit and transuranic pits and trenches (TRU-PTs) at the Idaho National Engineering Laboratory (INEL) Subsurface Disposal Area (SDA). However, a number of technical issues must be resolved before ISV can be considered applicable to these waste sites. To assist in the ISV technology evaluation, an ISV Steering Committee was formed to identify, prioritize, and develop closure roadmaps for technical issues lated with ISV application at the SDA. The activities of the ISV Steering Committee are summarized in a three-volume report. Volume I identifies the systematic approach used to identify and prioritize the ISV technical issues and briefly discusses the methodology that will be employed to resolve these issues. Volumes 2 and 3 discuss each technical issue in greater detail and suggest specific closure roadmaps to be used in resolving technical issues associated with ISV at the SDA Acid Pit and TRU-PTS, respectively. The three-volume report is a working document that will be updated as necessary to reflect current evaluation strategy for the ISV technology. This is Volume 3

  13. Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

  14. Continuing Clean-up at Oak Ridge, Portsmouth and Paducah-Successes and Near-Term Plans

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, L. L.; Houser, S. M.; Starling, D. A.

    2002-02-26

    This paper describes the complexities and challenges associated with the Oak Ridge Environmental Management (EM) cleanup program and the steps that DOE and Bechtel Jacobs Company LLC (the Oak Ridge EM team) have collaboratively taken to make significant physical progress and get the job done. Maintaining significant environmental cleanup progress is a daunting challenge for the Oak Ridge EM Team. The scale and span of the Oak Ridge Operations (ORO) cleanup is immense-five major half-century-old installations in three states (three installations are complete gaseous diffusion plants), with concurrent cleanup at the fully operational Oak Ridge National Laboratory and Y-12 National Security Complex, and with regulatory oversight from three states and two United States (US) Environmental Protection Agency (EPA) Regions. Potential distractions arising from funding fluctuations and color-of-money constraints, regulatory negotiations, stakeholder issues, or any one of a number of other potential delay phenomena can not reduce the focus on safely achieving project objectives to maintain cleanup momentum.

  15. Use of decision analysis techniques to determine Hanford cleanup priorities

    International Nuclear Information System (INIS)

    Fassbender, L.; Gregory, R.; Winterfeldt, D. von; John, R.

    1992-01-01

    In January 1991, the U.S. Department of Energy (DOE) Richland Field Office, Westinghouse Hanford Company, and the Pacific Northwest Laboratory initiated the Hanford Integrated Planning Process (HIPP) to ensure that technically sound and publicly acceptable decisions are made that support the environmental cleanup mission at Hanford. One of the HIPP's key roles is to develop an understanding of the science and technology (S and T) requirements to support the cleanup mission. This includes conducting an annual systematic assessment of the S and T needs at Hanford to support a comprehensive technology development program and a complementary scientific research program. Basic to success is a planning and assessment methodology that is defensible from a technical perspective and acceptable to the various Hanford stakeholders. Decision analysis techniques were used to help identify and prioritize problems and S and T needs at Hanford. The approach used structured elicitations to bring many Hanford stakeholders into the process. Decision analysis, which is based on the axioms and methods of utility and probability theory, is especially useful in problems characterized by uncertainties and multiple objectives. Decision analysis addresses uncertainties by laying out a logical sequence of decisions, events, and consequences and by quantifying event and consequence probabilities on the basis of expert judgments

  16. A software tool for soil clean-up technology selection

    International Nuclear Information System (INIS)

    Vranes, S.; Gonzalez-Valencia, E.; Lodolo, A.; Miertus, S.

    2002-01-01

    Soil remediation is a difficult, time-consuming and expensive operation. A variety of mature and emerging soil remediation technologies is available and future trends in remediation will include continued competition among environmental service companies and technology developers, which will definitely result in further increase in the clean-up options. Consequently, the demand has enhanced developing decision support tools that could help the decision makers to select the most appropriate technology for the specific contaminated site, before the costly remedial actions are taken. Therefore, a software tool for soil clean-up technology selection is currently being developed with the aim of closely working with human decision makers (site owners, local community representatives, environmentalists, regulators, etc.) to assess the available technologies and preliminarily select the preferred remedial options. The analysis for the identification of the best remedial options is based on technical, financial, environmental, and social criteria. These criteria are ranked by all involved parties to determine their relative importance for a particular project. (author)

  17. Technical design issues for a field-portable supercritical fluid extractor

    Energy Technology Data Exchange (ETDEWEB)

    Wright, B.W.; Zemanian, T.S.; Robins, W.H.; Wright, C.W.

    1995-01-01

    Supercritical fluid extraction is gaining acceptance as an alternative sample preparation method for trace organic analysis. The development of SFE instrumentation optimized for field use requires taking several technical design issues including size and weight requirements, user-friendly operation, and technical performance capabilities into consideration. Parameters associated with a prototype SFE instrument under development for potential use in conducting on-site inspections of the Chemical Weapons Convention and its preliminary technical and operational performance are described.

  18. Research and Development Issues for Interactive Electronic Technical Manuals

    National Research Council Canada - National Science Library

    Ricci, Katrina

    2002-01-01

    .... While there is a wide range of research issues associated with technical manuals, the focus of the Intelligent Performance Support and Training effort is the development and evaluation of various...

  19. Technical issues associated with in situ vitrification of the INEL Subsurface Disposal Area

    International Nuclear Information System (INIS)

    Stoots, C.M.; Bates, S.O.; Callow, R.A.; Campbell, K.A.; Farnsworth, R.K.; Gratson, G.K.; McKellar, M.G.; Nickelson, D.F.; Slater, C.E.

    1991-12-01

    In situ vitrification (ISV) has been identified as an alternative technology for remediation of the Acid Pit and Transuranic Pits and Trenches (TRU-PTs) that are present at the Idaho National Engineering Laboratory (INEL) Subsurface Disposal Area (SDA). However, a number of technical issues exist that must be resolved before ISV can be considered applicable to these waste sites. To assist in the ISV technology evaluation, an ISV Steering Committee was formed to identify, prioritize, and develop closure roadmaps for technical issues associated with ISV application at the INEL SDA. The activities of the ISV Steering Committee are summarized in three volumes of this report. This document, Volume 1, identifies the systematic approach used to identify and prioritize the ISV technical issues, and briefly discusses the methodology that will be employed to resolve these issues

  20. Accelerating cleanup: Paths to closure

    International Nuclear Information System (INIS)

    1998-06-01

    This report describes the status of Environmental Management's (EM's) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE's 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM's accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document

  1. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    International Nuclear Information System (INIS)

    Seed, Ian; James, Paula; Mathieson, John; Judd, Laurie; Elmetti-Ramirez, Rosa; Han, Ana

    2013-01-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  2. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    Energy Technology Data Exchange (ETDEWEB)

    Seed, Ian; James, Paula [Cogentus Consulting (United States); Mathieson, John [NDA United Kingdom (United Kingdom); Judd, Laurie [NuVision Engineering, Inc. (United States); Elmetti-Ramirez, Rosa; Han, Ana [US DOE (United States)

    2013-07-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  3. Technical Issues Map for the NHI System Interface and Support Systems Area: 1st Quarter FY 07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2006-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool for future work package planning

  4. Coolant cleanup system for a nuclear reactor

    International Nuclear Information System (INIS)

    Shiina, Atsushi; Usui, Naoshi; Yamamoto, Michiyoshi; Osumi, Katsumi.

    1983-01-01

    Purpose: To maintain the electric conductivity of reactor water lower and to minimize the heat loss in the cleanup system by providing a low temperature cleanup system and a high temperature cleanup system together. Constitution: A low temperature cleanup system using ion exchange resins as filter aids and a high temperature cleanup system using inorganic ion exchange materials as filter aids are provided in combination. A part of the reactor water in a reactor pressure vessel is passed through a conductivity meter, one portion of which flows into the high temperature cleanup system having no heat exchanger and filled with inorganic ion exchange materials by way of a first flow rate control valve and the other portion of which flows into the low temperature cleanup system having heat exchangers and filled with the ion exchange materials by way of a second control valve. The first control valve is adjusted so as to flow, for example, about more than 15% of the feedwater flow rate to the high temperature cleanup system and the second control valve is adjusted with its valve opening degree depending on the indication of the conductivity meter so as to flow about 2 - 7 % of the feedwater flow rate into the low temperature cleanup system, to thereby control the electric conductivity to between 0.055 - 0.3 μS/cm. (Moriyama, K.)

  5. HANFORD SITE CENTRAL PLATEAU CLEANUP COMPLETION STRATEGY

    International Nuclear Information System (INIS)

    Bergman, T.B.

    2011-01-01

    Cleanup of the Hanford Site is a complex and challenging undertaking. The U.S. Department of Energy (DOE) has developed a comprehensive vision for completing Hanford's cleanup mission including transition to post-cleanup activities. This vision includes 3 principle components of cleanup: the ∼200 square miles ofland adjacent to the Columbia River, known as the River Corridor; the 75 square miles of land in the center of the Hanford Site, where the majority of the reprocessing and waste management activities have occurred, known as the Central Plateau; and the stored reprocessing wastes in the Central Plateau, the Tank Wastes. Cleanup of the River Corridor is well underway and is progressing towards completion of most cleanup actions by 2015. Tank waste cleanup is progressing on a longer schedule due to the complexity of the mission, with construction of the largest nuclear construction project in the United States, the Waste Treatment Plant, over 50% complete. With the progress on the River Corridor and Tank Waste, it is time to place increased emphasis on moving forward with cleanup of the Central Plateau. Cleanup of the Hanford Site has been proceeding under a framework defmed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In early 2009, the DOE, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency signed an Agreement in Principle in which the parties recognized the need to develop a more comprehensive strategy for cleanup of the Central Plateau. DOE agreed to develop a Central Plateau Cleanup Completion Strategy as a starting point for discussions. This DOE Strategy was the basis for negotiations between the Parties, discussions with the State of Oregon, the Hanford Advisory Board, and other Stakeholder groups (including open public meetings), and consultation with the Tribal Nations. The change packages to incorporate the Central Plateau Cleanup Completion Strategy were signed by the

  6. Defining the framework for environmentally compliant cleanup: The Hanford site tri-party agreement

    International Nuclear Information System (INIS)

    Austin, B.A.; Wisness, S.H.

    1994-01-01

    The Hanford Federal Facility Agreement and Consent Order, commonly called the Tri-Party Agreement, was signed by the U.S. Environmental Protection Agency (EPA), the State of Washington Department of Ecology (Ecology), and the U.S. Department of Energy (DOE) in May of 1989. It was the first three-party agreement of its magnitude in the country and was touted as a landmark agreement. It was one of the most significant actions that has been taken to define the framework for environmentally compliant cleanup actions at the Hanford Site. Accomplishments thus far represent a lot of planning, permitting, and development activities either required by regulation or necessary to ensure an adequate infrastructure to support cleanup activities. Actual cleanup work and construction of new facilities are beginning to accelerate as the Hanford Site moves out of study and development phases into actual cleanup activities. Significant changes to the Hanford Tri-Party Agreement were negotiated between May 1993 and January 1994. These negotiations were precipitated by the completion of a 15-month rebaselining study of the Hanford Site's Tank Waste Remediation System. The revised agreement is based on comments and values the three agencies heard from people of the region during the negotiation process. The recent renegotiation reflected an ability of the agencies and the agreement to change commensurate with technical, economic, and political realities of today. Hanford has moved into a new era of public participation which will continue to watch and guide cleanup efforts in manners satisfactory to regional concerns and values

  7. Technical issues in licensing low-level radioactive waste facilities

    Energy Technology Data Exchange (ETDEWEB)

    Junkert, R. [California Dept. of Health Services, CA (United States)

    1993-03-01

    The California Department of Health Service spent two years in the review of an application for a low-level radioactive waste disposal facility in California. During this review period a variety of technical issues had to be evaluated and resolved. One of the first issues was the applicability and use of NRC guidance documents for the development of LLW disposal facilities. Other technical issues that required intensive evaluations included surface water hydrology, seismic investigation, field and numerical analysis of the unsaturated zone, including a water infiltration test. Source term verification became an issue because of one specific isotope that comprised more than 90% of the curies projected for disposal during the operational period. The use of trench liners and the proposed monitoring of the unsaturated zone were reviewed by a highly select panel of experts to provide guidance on the need for liners and to ensure that the monitoring system was capable of monitoring sufficient representative areas for radionuclides in the soil, soil gas, and soil moisture. Finally, concerns about the quality of the preoperational environmental monitoring program, including data, sample collection procedures, laboratory analysis, data review and interpretation and duration of monitoring caused a significant delay in completing the licensing review.

  8. Technical Issues Map for the NHI System Interface and Support Systems Area: 3rd Quarter FY 07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2007-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool by the NHI technical leadership for future work package planning. The technical map in its present form will be discontinued in FY08 and will be folded into a larger NHI System Interface and Support Systems project management plan and scope baseline statement in FY08

  9. Public participation in the evaluation of innovative environmental cleanup technology

    International Nuclear Information System (INIS)

    Peterson, T.; McCabe, G.; Serie, P.; Niesen, K.

    1994-08-01

    Technologies for remediation of contamination are urgently needed to clean up US Department of Energy (DOE) sites across the country. DOE is managing a national program to develop, demonstrate, and deploy new technologies with promise to expedite this cleanup. The Integrated Demonstration for Cleanup of Volatile Organic Compounds at Arid Sites (VOC-Arid ID) is one such effort. Time and resources, however, are too limited to be invested in methods of remediation that will never be deployed because they have not been rigorously evaluated or because they face the withering opposition of stakeholders. Therefore the VOC-Arid ID is assessing technology both in terms of its technical effectiveness and its stakeholder acceptability. Only if a technology performs as required and is acceptable to regulators, users of technology, and the public will the VOC-Arid ID recommend its use. What distinguishes public involvement in the VOC-Arid ID is the direct influence stakeholders have on the design of technology demonstrations by working directly with technology developers. Stakeholders participated in defining the criteria with which innovative environmental cleanup technology is being evaluated. The integrated demonstration is committed to providing stakeholders with the information they've indicated they need to reach reasoned judgments about the use of specific cleanup technologies. A guiding principle of the VOC-Arid ID is that stakeholder participation improves the technologies being developed, enhances the acceptance of the technologies, and will lead to the broad and timely deployment of appropriate and effective methods of environmental remediation. The VOC-Arid ID has involved stakeholders from the host demonstration site, Hanford, Washington, and from other and sites where the ID technologies may be deployed

  10. Development and Use of Life-Cycle Analysis Capabilities To Evaluate, Select, and Implement Plans to Accelerate Hanford Site Cleanup

    International Nuclear Information System (INIS)

    Shay, Michael R.; Johnson, Wayne L.; Frey, Jeffrey A.

    2004-01-01

    Over the past year the U.S. Department of Energy (DOE) has made significant progress in developing and executing plans to transform and accelerate cleanup of the Hanford Site. Notable progress has been in the cleanup of the River Corridor, including the relocation of spent nuclear fuel to the Central Plateau, and the stabilization of plutonium materials. However, difficult work still remains. DOE has already accelerated the completion of the Environmental Management (EM) cleanup mission from 2070 to 2035 and believes its completion can be achieved even sooner by reducing excess conservatism, substantively changing technical strategy and management approach, and making new front-end investments. Work is well under way in the detailed planning, analyses and decision making required to implement and support the execution of the accelerated cleanup program at Hanford. Various cleanup, contract, and regulatory approaches are being explored. DOE has instituted a process that allows DOE to efficiently explore and test alternative cleanup approaches using a life-cycle model. This paper provides a means to share the planning approach and the life-cycle modeling and analysis tools used with other sites and interested parties. This paper will be of particular interest to analysts performing similar planning and evaluations at other sites as well as provide insight into the current status of Hanford's cleanup program and DOE's plans for the future

  11. Technical findings related to Generic Issue 23: Reactor coolant pump seal failure

    International Nuclear Information System (INIS)

    Ruger, C.J.; Luckas, W.J. Jr.

    1989-03-01

    Reactor coolant pumps contain mechanical seals to limit the leakage of pressurized coolant from the reactor coolant system to the containment. These seals have the potential to leak, and a few have degraded and even failed resulting in a small break loss of coolant accident (LOCA). As a result, ''Reactor Coolant Pump Seal Failure,'' Generic Issue 23 was established. This report summarizes the findings of a technical investigation generated as part of the program to resolve this issue. These technical findings address the various fact-finding issue tasks developed for the action plan associated with the generic issue, namely background information on seal failure, evaluation of seal cooling, and mechanical- and maintenance-induced failure mechanisms. 46 refs., 15 figs., 14 tabs

  12. Coolant clean-up system in nuclear reactor

    International Nuclear Information System (INIS)

    Tsuburaya, Hirobumi; Akita, Minoru; Shiraishi, Tadashi; Kinoshita, Shoichiro; Okura, Minoru; Tsuji, Akio.

    1987-01-01

    Purpose: To ensure a sufficient urging pressure at the inlet of a coolant clean-up system pump in a nuclear reactor and eliminate radioactive contaminations to the pump. Constitution: Coolant clean-up system (CUW) pump in a nuclear reactor is disposed to the downstream of a filtration desalter and, for compensating the insufficiency of the urging pressure at the pump inlet, the reactor water intake port to the clean-up system is disposed to the downstream of the after-heat removing pump and the heat exchanger. By compensating the net positive suction head (NPSH) of the clean-up system from the residual heat removing system, the problems of insufficient NPSH for the CUW pump upon reactor shut-down can be dissolved and, accordingly, the reactor clean-up system can be arranged in the order of the heat exchanger, clean-up device and pump. Thus, the CUW pump acts on reactor water after cleaned-up in the clean-up device to reduce the radioactivity contamination to the pump. (Kawakami, Y.)

  13. Technical and Regulatory Considerations in Using Freight Containers as Industrial Packages

    Energy Technology Data Exchange (ETDEWEB)

    Hawk, Mark B [ORNL; Opperman, Erich [Washington Savannah River Company; Natali, Ronald [R. B. Natali Consulting, Inc.

    2008-01-01

    The US Department of Energy (DOE), Office of Environmental Management (EM), is actively pursuing activities to reduce the radiological risk and clean up the environmental legacy of the nation's nuclear weapons programmes. The EM has made significant progress in recent years in the clean-up and closure of sites and is also focusing on longer term activities necessary for the completion of the clean-up programme. The packaging and transportation of contaminated demolition debris and low level waste materials in a safe and cost effective manner are essential in completing this mission. Toward this end, the US Department of Transportation's Final Rule on Hazardous Materials Regulation issued on 26 January 2004, included a new provision authorising the use of freight containers (e.g. 20 and 40 ft ISO containers) as industrial packages type 2 or 3. This paper will discuss the technical and regulatory considerations in using these newly authorised and large packages for the packaging and transportation of low level waste materials.

  14. Restoration principles and criteria: superfund program policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Walker, Stuart

    2006-01-01

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) is responsible for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund program. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a consistent manner as with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund's primary program for long-term cleanup, the National Priorities List (NPL), chemical contamination is also present. (author)

  15. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report

    International Nuclear Information System (INIS)

    Peurrung, L.M.

    1999-05-01

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects

  16. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Peurrung, L.M.

    1999-06-30

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects.

  17. Cleanup of contaminated areas

    International Nuclear Information System (INIS)

    Beone, G.; Carbone, A.I.; Zagaroli, M.

    1989-01-01

    The paper deals with the problem of contaminated areas cleanup, in order to eliminate every possible damage for man safety and environment and to site recovery for some utilization, The first step of cleanup operation is site characterization, that is followed by a pianificazion activity for a better definition of staff qualification, technology to be used, protection and prevention instruments for the risks due to contaminants handling. The second section describes the different remedial technologies for contaminated sites. Remedial technologies may be divided into on-site/off-site and in-situ treatments, according to whether materials (waste, soil, water) are moved to another location or not, respectively. Finally, it is outlined that contaminated areas cleanup is a typical multidisciplinary activity because very different competences are required. (author)

  18. Implementing the shoreline cleanup assessment team process in the Gulf of Mexico

    International Nuclear Information System (INIS)

    Debusschere, K.; Penland, S.; Ramsey, K.E.; Lindstedt, D.; Westphal, K.A.; Seal, R.; McBride, R.A.; Byrnes, M.R.; Owens, E.

    1993-01-01

    Louisiana State University (LSU) and Woodward-Clyde Consultants are working with state and federal agencies and industry through the LSU Gulf of Mexico Oil Spill Research and Response Program to establish a shoreline cleanup assessment team program (SCAT) in the Gulf of Mexico. Each SCAT team consists of a coastal geomorphologist and ecologist (and archaeologist when appropriate), as well as representatives from the responsible federal, state, and private agencies. This cooperative effort is aimed at identifying oil spill impact and interagency coastal resource concerns and recommendations, and developing a cleanup strategy based on interagency cooperation and concurrence within a systematic and standardized framework. The SCAT program provides interagency coordination, SCAT preparedness, spill drill participation, interagency training, geographic information systems services, monitoring, and routine aerial videotape surveys. It also offers technical support to the decision-making process within spill response operations

  19. The Virtual Orchestra: Technical and Creative Issues

    Science.gov (United States)

    BIANCHI, F. W.; CAMPBELL, R. H.

    2000-04-01

    The interactive multi-channel computer music system known as the Virtual Orchestra has been used several times in professional opera and theater as an alternative to a live pit orchestra. The technical issues associated with this emerging technology, and the logistical problems of implementing it are discussed. In addition, this paper describes the equally important issues regarding the creative impact this will have on the industry. In particular, this paper explores the role of the musician/technologist and suggests that many of the fundamental premises of opera production will change as the industry begins to retool. This would include the way opera is rehearsed and performed, how it is created and disseminated, and how it will adjust to changing demographics.

  20. Public involvement in cleanup - the Rocky Flats experience

    International Nuclear Information System (INIS)

    Paukert, J.; Pennock, S.; Schassburger, R.

    1992-01-01

    The U.S. Department of Energy's Rocky Flats Plant recently completed and implemented the Rocky Flats Plant Community Relations Plan for public involvement in environmental restoration of the site. The plan was developed in cooperation with the plant's regulators, the U.S. Environmental Protection Agency and the Colorado Department of Health. In addition, citizens near the plant played a significant role in shaping the document through extensive community interviews and public comment. The result of these cooperative efforts is a plan that meets and exceeds the applicable federal and state community relations requirements for a cleanup program. In fact, the U.S. Environmental Protection Agency has used the Rocky Flats Plant Community Relations Plants a model for similar plans at other federal facilities. Plan development, however, is only the starting point for an effective community relations effort. The Rocky Flats Plant and the public will face many challenges together as we implement the plan and build a partnership for addressing environmental cleanup issues. (author)

  1. Data clean-up and management a practical guide for librarians

    CERN Document Server

    Hogarth, Margaret

    2012-01-01

    Data use in the library has specific characteristics and common problems. Data Clean-up and Management addresses these, and provides methods to clean up frequently-occurring data problems using readily-available applications. The authors highlight the importance and methods of data analysis and presentation, and offer guidelines and recommendations for a data quality policy. The book gives step-by-step how-to directions for common dirty data issues.focused towards libraries and practicing librariansdeals with practical, real-life issues and addresses common problems that all libraries faceoffe

  2. Cleanup of radioactivity contamination in environment

    International Nuclear Information System (INIS)

    Kosako, Toshiso

    1994-01-01

    Environmental radioactivity cleanup is needed under a large scale accident in a reactor or in an RI irradiation facility which associates big disperse of radioactivities. Here, the fundamental concept including a radiation protection target, a period classification, planning, an information data base, etc. Then, the methods and measuring instruments on radioactivity contamination and the cleanup procedure are explained. Finally, the real site examples of accidental cleanup are presented for a future discussion. (author)

  3. Recycling Facilities - Land Recycling Cleanup Locations

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Land Recycling Cleanup Location Land Recycling Cleanup Locations (LRCL) are divided into one or more sub-facilities categorized as media: Air, Contained Release or...

  4. Investigating Technical and Pedagogical Usability Issues of Collaborative Learning with Wikis

    Science.gov (United States)

    Hadjerrouit, Said

    2012-01-01

    Wikis have been recently promoted as tools that foster collaborative learning. However, there has been little research devoted to the criteria that are suitable to address issues pertinent to collaborative learning. This paper proposes a set of criteria to explore technical and pedagogical usability issues of collaborative learning with wikis. The…

  5. Socio-technical Issues for Ubiquitous Information Society in 2010

    Science.gov (United States)

    Funabashi, Motohisa; Homma, Koichi; Sasaki, Toshiro; Sato, Yoshinori; Kido, Kunihiko; Fukumoto, Takashi; Yano, Koujin

    Impact of the ubiquitous information technology on our society is so significant that directing technological development and preparing institutional apparatus are quite important and urgent. The present paper elaborates, with the efforts by both humanity and engineering disciplines, to find out the socio-technical issues of ubiquitous information society in 2010 by inspecting social implications of emerging technology as well as social expectations. In order to deliberate the issues, scenarios are developed that describes possible life in ubiquitous information society. The derived issues cover integrating information technology and human body, producing smart sharable environment, protecting individual rights, fostering new service business, and forming community.

  6. Power system technical performance issues related to the application of long HVAC cables

    DEFF Research Database (Denmark)

    Wiechowski, on behalf of Cigre WG C4.502, W.; Sluis, L. V. der; Ohno, Teruo

    2011-01-01

    This paper reports the progress of work of Cigre Working Group C4.502 “Power system technical performance issues related to the application of long HVAC cables”. The primary goal of the WG C4.502 is to write a technical brochure that will serve as practical guide for performing studies necessary...... for assessing the technical performance of HV/EHV systems with large share of AC cable lines. This paper besides providing a background for formulation of WG C4.502 and its overall aim, describes the tasks that were accomplished before the interim report was submitted to Study Committee C4 System Technical...... Performance in August 2010. The work in the WG is ongoing and final report will be ready according to the time schedule in 2012. The focus of this paper is in particular to show all issues related to system technical performance with assigned weights in terms of their importance and/or uniqueness for cable...

  7. On technical security issues in cloud computing

    DEFF Research Database (Denmark)

    Jensen, Meiko; Schwenk, Jörg; Gruschka, Nils

    2009-01-01

    , however, there are still some challenges to be solved. Amongst these are security and trust issues, since the user's data has to be released to the Cloud and thus leaves the protection sphere of the data owner. Most of the discussions on this topics are mainly driven by arguments related to organisational......The Cloud Computing concept offers dynamically scalable resources provisioned as a service over the Internet. Economic benefits are the main driver for the Cloud, since it promises the reduction of capital expenditure (CapEx) and operational expenditure (OpEx). In order for this to become reality...... means. This paper focusses on technical security issues arising from the usage of Cloud services and especially by the underlying technologies used to build these cross-domain Internet-connected collaborations....

  8. Applicability of the Clean Water Act to Indian tribes - may tribes stop or constrain a cleanup?

    International Nuclear Information System (INIS)

    Emge, M.L.

    1993-01-01

    Indian tribes retain their sovereign rights of self-government and self-determination unless it is specifically waived by the tribe or abrogated by the US Congress, through treaty or statute. The Clean Water Act does not specifically abrogate tribal sovereignty. This raises the issue of what would occur if an on-scene coordinator decides that cleanup of tribal lands is necessary to protect the public health and welfare, but the tribe does not want the cleanup activities to proceed? May a tribe impede cleanup efforts? During the cleanup of the barge Nestucca oil spill, this occurred when the Quinault Tribe did not allow the OSC to clean lands that the tribe holds sacred. This issue with the Clean Water Act has not been decided by Congress, nor by the courts. Recently, courts have applied at least three different approaches to determine if a statute of general application, such as the Clean Water Act, applies to Indian tribes. The different tests do not always yield the same result. An on-scene coordinator, when confronted with this scenario, might handle the situation in several different ways, or perhaps move to prevent such an occurrence. The different approaches used by the courts can be taken together to gain a sense of whether the Clean Water Act may preempt tribal sovereignty

  9. Effectiveness of cleanup criteria relative to an accidental nuclear release

    International Nuclear Information System (INIS)

    Chen, S.Y.; Yuan, Y.C.

    1988-01-01

    In the event of an accidental nuclear release, the associated long-term radiological risks would result primarily from ground contamination pathways. Cleanup of the contaminated ground surfaces is a necessary step toward reducing the radiological risk to the general population. Ideally, the radiological risk decreases as the level of cleanup effort increases; however, as the cleanup criterion (i.e., the required contaminant concentration after cleanup) becomes more stringent, the cleanup effort may become prohibitively costly. This study examines several factors that are important in determining the effectiveness of the cleanup criteria for selected radionuclides: (a) annual individual dose commitment (mrem/yr), (b) total population environmental dose commitment (person-rem), and (c) total area (km 2 ) requiring cleanup following an accident. To effectively protect the general population, the benefits of cleanup should be weighed against the potentially large increase in cleanup area (and the associated costs) as the cleanup criterion becomes more stringent. The effectiveness of cleanup will vary, depending largely on site-specific parameters such as population density and agricultural productivity as well as on the amount and type of radionuclide released. Determination of an optimum cleanup criterion should account for all factors, including a comprehensive cost/benefit analysis

  10. The cloud security ecosystem technical, legal, business and management issues

    CERN Document Server

    Ko, Ryan

    2015-01-01

    Drawing upon the expertise of world-renowned researchers and experts, The Cloud Security Ecosystem comprehensively discusses a range of cloud security topics from multi-disciplinary and international perspectives, aligning technical security implementations with the most recent developments in business, legal, and international environments. The book holistically discusses key research and policy advances in cloud security - putting technical and management issues together with an in-depth treaties on a multi-disciplinary and international subject. The book features contributions from key tho

  11. Cleanup and decommissioning of a nuclear reactor after a severe accident

    International Nuclear Information System (INIS)

    1992-01-01

    Although the development of commercial nuclear power plants has in general been associated with an excellent record of nuclear safety, the possibility of a severe accident resulting in major fuel and core damage cannot be excluded and such accidents have in fact already occurred. For over a decade, IAEA publications have provided technical guidance and recommendations for post-accident planning to be considered by appropriate authorities. Guidance and recommendations have recently been published on the management of damaged nuclear fuel, sealing of the reactor building and related safety and performance assessment aspects. The present technical report on the cleanup and decommissioning of reactors which have undergone a severe accident represents a further publication in the series. Refs, figs and tabs.

  12. A study on the regulatory approach of major technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Keun Sun; Choi, J. T.; Kim, I. J. [Sunmoon Univ., Asan (Korea, Republic of); Lee, S. H.; Baek, W. P.; Yang, S. H. [Korea Association for Nuclear Technology, Taejon (Korea, Republic of)

    1998-06-15

    This project is to provide the regulatory direction of 4 major technical issues for the Korean Next Generation Reactors, which are parts of major technical issues resulted from the safety regulation R and D on the KNGR. The outstanding results are as follows : reliability of risk significant SSCs established during design stage must be maintained through the operating life of the plant, currently used classification method of plant conditions and safety requirement were reviewed, and a quantitative classification method is needed to be developed further, the basic regulatory directions are proposed for multiple failures such as SBO, TLOFW, multiple SGTR and ATWS, safety requirements are proposed for survivability/availability of severe accident mitigation design features by 5 items if basic requirements, selection of initial event, identification of available equipment and instruments, identification of environmental conditions and verification methods.

  13. US Department of Energy Environmental Cleanup Technology Development program: Business and research opportunities guide

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    The US Department of Energy (DOE) Office of Environmental Restoration and Waste Management (EM) is charged with overseeing a multi-billion dollar environmental cleanup effort. EM leads an aggressive national research, development, demonstration, testing, and evaluation program to provide environmental restoration and waste management technologies to DOE sites, and to manage DOE-generated waste. DOE is firmly committed to working with industry to effectuate this cleanup effort. We recognize that private industry, university, and other research and development programs are valuable sources of technology innovation. The primary purpose of this document is to provide you with information on potential business opportunities in the following technical program areas: Remediation of High-Level Waste Tanks; Characterization, Treatment, and Disposal of Mixed Waste; Migration of Contaminants; Containment of Existing Landfills; Decommissioning and Final Disposition, and Robotics.

  14. Shoreline clean-up methods : biological treatments

    Energy Technology Data Exchange (ETDEWEB)

    Massoura, S.T. [Oil Spill Response Limited, Southampton (United Kingdom)

    2009-07-01

    The cleanup of oil spills in shoreline environments is a challenging issue worldwide. Oil spills receive public and media attention, particularly in the event of a coastal impact. It is important to evaluate the efficiency and effectiveness of cleanup methods when defining the level of effort and consequences that are appropriate to remove or treat different types of oil on different shoreline substrates. Of the many studies that have compared different mechanical, chemical and biological treatments for their effectiveness on various types of oil, biological techniques have received the most attention. For that reason, this paper evaluated the effectiveness and effects of shoreline cleanup methods using biological techniques. It summarized data from field experiments and oil spill incidents, including the Exxon Valdez, Sea Empress, Prestige, Grand Eagle, Nakhodka, Guanabara Bay and various Gulf war oil spills. Five major shoreline types were examined, notably rocky intertidal, cobble/pebble/gravel, sand/mud, saltmarsh, and mangrove/sea-grass. The biological techniques that were addressed were nutrient enrichment, hydrocarbon-utilizing bacteria, vegetable oil biosolvents, plants, surf washing, oil-particle interactions and natural attenuation. The study considered the oil type, volume and fate of stranded oil, location of coastal materials, extent of pollution and the impact of biological techniques. The main factors that affect biodegradation of hydrocarbons are the volume, chemical composition and weathering state of the petroleum product as well as the temperature, oxygen availability of nutrients, water salinity, pH level, water content, and microorganisms in the shoreline environment. The interaction of these factors also affect the biodegradation of oil. It was concluded that understanding the fate of stranded oil can help in the development of techniques that improve the weathering and degradation of oil on complex shoreline substrates. 39 refs.

  15. Risk assessment applications for determining cleanup limits for uranium in treated and untreated soils

    International Nuclear Information System (INIS)

    Armstrong, A.Q.; Layton, D.W.; Rutz, E.E.

    1994-01-01

    Uranium-contaminated soils are present at various locations across the US where uranium was processed for nuclear fuels or atomic weapons. Important issues relative to such contamination include the assessment of potential health risks associated with human exposures to the residual uranium and the determination of safe levels of uranium in soils that have been treated by a given technology. This paper discusses various risk assessment considerations that must be dealt with when developing cleanup limits for uranium in treated and untreated soils. Key issues addressed include alternative land use scenarios, potential exposure pathways, characterization of the bioavailability of uranium compounds in food and water, a brief overview of health risks associated with uranium and its daughter products as well as a summary of considerations for development of risk-based cleanup limits for uranium in soils

  16. Credibility and trust in federal facility cleanups

    International Nuclear Information System (INIS)

    Raynes, D.B.

    1995-01-01

    The most important indicator of a well-managed site cleanup effort may no longer be funding or scientific expertise. While support for federal facility cleanup has included appropriations of more than $10 billion annually, these expenditures alone are unlikely to assure progress toward environmental remediation. open-quotes Trustclose quotes is now overwhelmingly mentioned as a prerequisite for progress with site cleanup in DOE's weapons complex. In part, federal budget deficits are forcing participants to focus on factors that build consensus and lead to cost-effective cleanup actions. In some cases, the stakeholders at cleanup sites are making efforts to work cooperatively with federal agencies. A report by 40 representatives of federal agencies, tribal and state governments, associations, and others developed recommendations to create a open-quotes new era of trust and consensus-building that allows all parties to get on with the job of cleaning up federal facilities in a manner that reflects the priorities and concerns of all stakeholders.close quotes Changes are underway affecting how federal agencies work with federal and state regulators reflecting this concept of shared responsibility for conducting cleanup. This paper addresses these changes and provides examples of the successes and failures underway

  17. Fast-Track Cleanup at Closing DoD Installations

    Science.gov (United States)

    The Fast-Track Cleanup program strives to make parcels available for reuse as quickly as possible by the transfer of uncontaminated or remediated parcels, the lease of contaminated parcels where cleanup is underway, or the 'early transfer' of contaminated property undergoing cleanup.

  18. Suggested technical scheme to help resolve regulatory issues

    Energy Technology Data Exchange (ETDEWEB)

    Harvey, T.

    1978-07-01

    A management-planning model envisioned as a useful tool for planning and guiding the development of a nuclear waste repository data base is described. It incorporates the technical assessment goals and objectives of the US Nuclear Regulatory Commission, and it provides a strategy for reaching them. The model strategy includes provisions for the breadth, timeliness, and defensibility of its predictions. Consideration is given to observational data, its structure, and future refinements. The structure of the data is consistent with the needs of a systems model whose structure is proposed to resolve questions about repository safety. Uncertainties are categorized as an aid in defining and resolving technical issues. The model provides a framework for ultimately exposing all the sensitive and controversial factors. Some quantitative aspects of data acquisition are presented. 12 figures.

  19. Suggested technical scheme to help resolve regulatory issues

    International Nuclear Information System (INIS)

    Harvey, T.

    1978-07-01

    A management-planning model envisioned as a useful tool for planning and guiding the development of a nuclear waste repository data base is described. It incorporates the technical assessment goals and objectives of the US Nuclear Regulatory Commission, and it provides a strategy for reaching them. The model strategy includes provisions for the breadth, timeliness, and defensibility of its predictions. Consideration is given to observational data, its structure, and future refinements. The structure of the data is consistent with the needs of a systems model whose structure is proposed to resolve questions about repository safety. Uncertainties are categorized as an aid in defining and resolving technical issues. The model provides a framework for ultimately exposing all the sensitive and controversial factors. Some quantitative aspects of data acquisition are presented. 12 figures

  20. Coolant clean-up and recycle systems

    International Nuclear Information System (INIS)

    Ito, Takao.

    1979-01-01

    Purpose: To increase the service life of mechanical seals in a shaft sealing device, eliminate leakages and improve the safety by providing a recycle pump for feeding coolants to a coolant clean-up device upon reactor shut-down and adapting the pump treat only low temperature and low pressure coolants. Constitution: The system is adapted to partially take out coolants from the pipeways of a recycling pump upon normal operation and feed them to a clean-up device. Upon reactor shut-down, the recycle pump is stopped and coolants are extracted by the recycle pump for shut-down into the clean-up device. Since the coolants are not fed to the clean-up device by the recycle pump during normal operation as conducted so far, high temperature and high pressure coolants are not directly fed to the recycle pump, thereby enabling to avoid mechanical problems in the pump. (Kamimura, M.)

  1. TECHNICAL AND REGULATORY CONSIDERATIONS IN USING FREIGHT CONTAINERS AS INDUSTRIAL PACKAGES

    Energy Technology Data Exchange (ETDEWEB)

    Opperman, E; Mark Hawk, M; Ron Natali, R

    2007-10-16

    The United States (US) Department of Energy (DOE), Office of Environmental Management (EM), is actively pursuing activities to reduce the radiological risk and clean up the environmental legacy of the nation's nuclear weapons programs. EM has made significant progress in recent years in the clean-up and closure of sites and is also focusing on longer-term activities necessary for the completion of the clean-up program. The packaging and transportation of contaminated demolition debris and low-level waste (LLW) materials in a safe and cost-effective manner are essential in completing this mission. Toward this end, the US Department of Transportation's (DOT) Final Rule on Hazardous Materials Regulation Final Rule issued January 26, 2004, included a new provision authorizing the use of Freight Containers (e.g., 20 and 40-foot ISO Containers) as Industrial Packages Type 1, 2, or 3 (IP-1, IP-2, and IP-3). This paper will discuss the technical and regulatory considerations in using these newly authorized and large packages for the packaging and transportation of LLW materials.

  2. Sorters for soil cleanup

    International Nuclear Information System (INIS)

    Bramlitt, E.T.; Johnson, N.R.; Tomicich, M.J.

    1991-01-01

    A soil sorter is a system with conveyor, radiation detectors, and a gate. The system activates the gate based on radiation measurements to sort soil to either clean or contaminated paths. Automatic soil sorters have been perfected for use in the cleanup of plutonium contaminated soil at Johnston Atoll. The cleanup processes soil through a plant which mines plutonium to make soil clean. Sorters at various locations in the plant effectively reduce the volume of soil for mining and they aid in assuring clean soil meets guidelines

  3. Development of teleoperated cleanup system

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Park, J. J.; Yang, M. S.; Kwon, H. J.

    2005-01-01

    This report describes the development of a teleoperated cleanup system for use in a highly radioactive environment of DFDF(DUPIC Fuel Demonstration Facility) at KAERI where direct human access to the in-cell is strictly limited. The teleoperated cleanup system was designed to remotely remove contaminants placed or fixed on the floor surface of the hot-cell by mopping them with wet cloth. This cleanup system consists of a mopping slave, a mopping master and a control console. The mopping slave located at the in-cell comprises a mopping tool with a mopping cloth and a mobile platform, which were constructed in modules to facilitate maintenance. The mopping master that is an input device to control the mopping slave has kinematic dissimilarity with the mopping slave. The control console provides a means of bilateral control flows and communications between the mopping master and the mopping slave. In operation, the human operator from the out-of-cell performs a series of decontamination tasks remotely by manipulating the mopping slave located in-cell via a mopping master, having a sense of real mopping. The environmental and mechanical design considerations, and control systems of the developed teleoperated cleanup system are also described

  4. Containment-emergency-sump performance. Technical findings related to Unresolved Safety Issue A-43

    International Nuclear Information System (INIS)

    1983-04-01

    This report summarizes key technical findings related to the Unresolved Safety Issue A-43, Containment Emergency Sump Performance, and provides recommendations for resolution of attendant safety issues. The key safety questions relate to: (a) effects of insulation debris on sump performance; (b) sump hydraulic performance as determined by design features, submergence, and plant induced effects, and (c) recirculation pump performance wherein air and/or particulate ingestion can occur. The technical findings presented in this report provide information relevant to the design and performance evaluation of the containment emergency sump

  5. Corrective measures evaluation report for technical area-v groundwater.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Johnathan L (North Wind, Inc., Idaho Falls, ID); Orr, Brennon R. (North Wind, Inc., Idaho Falls, ID); Dettmers, Dana L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID); Howard, Hope (North Wind, Inc., Idaho Falls, ID)

    2005-07-01

    This Corrective Measures Evaluation Report was prepared as directed by the Compliance Order on Consent issued by the New Mexico Environment Department to document the process of selecting the preferred remedial alternative for contaminated groundwater at Technical Area V. Supporting information includes background information about the site conditions and potential receptors and an overview of work performed during the Corrective Measures Evaluation. Evaluation of remedial alternatives included identification and description of four remedial alternatives, an overview of the evaluation criteria and approach, qualitative and quantitative evaluation of remedial alternatives, and selection of the preferred remedial alternative. As a result of the Corrective Measures Evaluation, it was determined that monitored natural attenuation of all contaminants of concern (trichloroethene, tetrachloroethene, and nitrate) was the preferred remedial alternative for implementation as the corrective measure to remediate contaminated groundwater at Technical Area V of Sandia National Laboratories/New Mexico. Finally, design criteria to meet cleanup goals and objectives and the corrective measures implementation schedule for the preferred remedial alternative are presented.

  6. Integrating stakeholders' issues and concerns into Nirex's technical research

    International Nuclear Information System (INIS)

    Atherton, Elisabeth

    2004-01-01

    This note outlines some of the activities that Nirex has undertaken to try and integrate stakeholders' issues and concerns into the technical research we have undertaken and how we are attempting to address their issues. Nirex arranges a range of dialogue activities including workshops, meetings, interviews and focus groups with a wide range of stakeholders. These events are coordinated under what is called the Nirex Involvement Programme. The feedback and inputs we have received at these events have been used to influence the work that we undertake. Nirex's interactions with stakeholders, particularly members of the public and local councillors in the aftermath of losing the 1997 rock characterisation facility public inquiry at Sellafield, has been fundamental to changing our whole approach. We are now trying to understand people's issues and recognising that Nirex is accountable to a wide constituency of stakeholders, but particularly the general public and their elected representatives. It has also enabled Nirex to attempt to integrate people's issues and concerns into its work programmes. Specific examples of where stakeholders' issues have impacted on the technical work Nirex undertakes are outlined. (author)

  7. Major clean-up effort in the ATLAS cavern

    CERN Document Server

    Marzio Nessi

    On Tuesday 10 October, 58 ATLAS collaborators volunteered to give a hand for a major clean-up of the ATLAS detector prior to the toroid magnet ramp-up. This special task monopolised all of the technical coordination team and eight supervisors to oversee the volunteers who were assigned to two separate five-hour shifts. The volunteers removed all sorts of loose material inside and outside the detector, focusing mainly on potentially magnetic material lost inside the detector and dirt accumulated over several months, not to mention zillions of clipped cable ties! The technical crew provided 120 garbage bags and all were used. All sorts of material that had been lost inside the detector by various people was retrieved, in particular small tools which could potentially damage the detector, as well as metallic fillings hazardous for the electronics once the magnet will be ramped up. A more detailed inspection followed for all the inside of the detector, making sure the current on the magnet could be raised to 5KA ...

  8. Moderator clean-up system in a heavy water reactor

    International Nuclear Information System (INIS)

    Sasada, Yasuhiro; Hamamura, Kenji.

    1983-01-01

    Purpose: To decrease the fluctuation of the poison concentration in heavy water moderator due to a heavy water clean-up system. Constitution: To a calandria tank filled with heavy water as poison-containing moderators, are connected both end of a pipeway through which heavy water flows and to which a clean-up device is provided. Strongly basic resin is filled within the clean-up device and a cooler is disposed to a pipeway at the upstream of the clean-up device. In this structure, the temperature of heavy water at the inlet of the clean-up device at a constant level between the temperature at the exit of the cooler and the lowest temperature for the moderator to thereby decrease the fluctuation in the poison concentration in the heavy water moderator due to the heavy water clean-up device. (Moriyama, K.)

  9. Overview of technical Issues Associated with the Long Term Storage of Light Water Reactor used Nuclear Fuel

    International Nuclear Information System (INIS)

    Sorenson, Ken B.

    2014-01-01

    The nuclear power technical community is developing the technical basis for demonstrating the safety of storing used nuclear fuel for extended periods of time. The combination of reactor operations that off-load spent fuel to interim storage, coupled with delays in repository construction, has resulted in the expectation that storage periods may be for longer periods of time than originally intended. As more fuel continues to be off-loaded from operating reactors, the need for expanded interim storage also increases. As repository programs are delayed, interim storage requirements will likely exceed licensing term limits. To address these operational realities, there has been a concerted international effort to identify and prioritize the technical issues that need to be addressed in order to demonstrate the safety of storing used nuclear fuel for extended periods of time. Since this is an international effort, different storage systems, regulations, and policies need to be considered. This results in differences in technical issues, as well as differences in priorities. However, this effort also identifies important commonalities in some technical areas that need to be addressed. A broad-based international evaluation of these technical issues provides a better understanding of technical concerns as they relate to individual storage systems and specific national regulatory frameworks. While there are several international activities underway that are focused on long term storage, this paper will discuss the activities of the Electric Power Research Institute (EPRI)/Extended Storage Collaboration Program (ESCP) International Subcommittee. A status report detailing the identification and prioritization of the technical issues was presented at the PSAM11 Conference in June 2012 (1). Since that conference, a final report has been completed by the EPRI/ESCP International Subcommittee (2). This paper will provide important results of the final report as well as

  10. HARVESTING EMSP RESEARCH RESULTS FOR WASTE CLEANUP

    International Nuclear Information System (INIS)

    Guillen, Donna Post; Nielson, R. Bruce; Phillips, Ann Marie; Lebow, Scott

    2003-01-01

    The extent of environmental contamination created by the nuclear weapons legacy combined with expensive, ineffective waste cleanup strategies at many U.S. Department of Energy (DOE) sites prompted Congress to pass the FY96 Energy and Water Development Appropriations Act, which directed the DOE to: ''provide sufficient attention and resources to longer-term basic science research, which needs to be done to ultimately reduce cleanup costs'', ''develop a program that takes advantage of laboratory and university expertise, and'' ''seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective.'' In response, the DOE initiated the Environmental Management Science Program (EMSP)-a targeted, long-term research program intended to produce solutions to DOE's most pressing environmental problems. EMSP funds basic research to lower cleanup cost and reduce risk to workers, the public, and the environment; direct the nation's scientific infrastructure towards cleanup of contaminated waste sites; and bridge the gap between fundamental research and technology development activities. EMSP research projects are competitively awarded based on the project's scientific, merit coupled with relevance to addressing DOE site needs. This paper describes selected EMSP research projects with long, mid, and short-term deployment potential and discusses the impacts, focus, and results of the research. Results of EMSP research are intended to accelerate cleanup schedules, reduce cost or risk for current baselines, provide alternatives for contingency planning, or provide solutions to problems where no solutions exist

  11. Technical issues in the geologic disposal of radioactive wastes

    International Nuclear Information System (INIS)

    Weart, W.D.

    1980-01-01

    The status of technical understanding regarding radioactive waste repositories in geologic media is improving at a rapid rate. Within a few years the knowledge regarding non-salt repositories will be on a par with that which now exists for salt. To date there is no technical reason to doubt that geologic repositories in several different geologic media can be safely implemented to provide long-term isolation of radioactive wastes. Indeed, for bedded salt, there is now sufficient knowledge to allow all the identified phenomena to be bounded with satisfactory resultant consequences. It is possible to now proceed with technical confidence in an orderly development of a bedded-salt repository at a satisfactory site. This development would call for in-situ experiments, at the earliest possible stage, to confirm or validate the predictions made for the site. These in-situ experiments will be necessary for each repository in a different rock type. If, for non-technical reasons, repository development is delayed, field test facilities should be located as soon as possible in geologic settings typical of proposed repositories. Extensive testing to resolve generic issues will allow subsequent development of repositories to proceed more rapidly with only minimal in-situ testing required to resolve site-specific concerns

  12. Eye pathologies of Chernobyl clean-up workers

    International Nuclear Information System (INIS)

    Eglite, A.; Ozola, G.; Curbakova, E.

    1998-01-01

    Diseases of the nervous system and sense organs have become the most significant pathologies of Chernobyl clean-up workers during the last four years. The aim of this work was to evaluate the incidence of eye disorders among Chernobyl clean-up workers to provide more information for health specialists. During the last 10 years, the most common eye pathology has been angiopathia retinae, followed by myopia and cataracta. Statistical analyses showed that the clean-up workers have higher risk to develop angiopathia retinae than the control group. (author)

  13. PETC Review, Issue 2, September 1990

    Energy Technology Data Exchange (ETDEWEB)

    Blaustein, B.; Reiss, J.; Riehle, B.; Brown, J.; Hammer, D. [eds.

    1990-09-01

    This issue of PETC Review provides short discussion on research programs in (1) combustion technology, (2) flue gas cleanup technology, (3) coal science and chemistry. An overview of the PETC New Fuels Evaluation Facility is given, the US Clean Coal Technology Program`s activities in Poland are discussed, and the NOXSO flue gas cleanup process is outlined. Supplemental sections on events, special focuses, publication listings, etc. are also included.

  14. PETC Review, Issue 2, September 1990

    Energy Technology Data Exchange (ETDEWEB)

    Blaustein, B.; Reiss, J.; Riehle, B.; Brown, J.; Hammer, D. (eds.)

    1990-09-01

    This issue of PETC Review provides short discussion on research programs in (1) combustion technology, (2) flue gas cleanup technology, (3) coal science and chemistry. An overview of the PETC New Fuels Evaluation Facility is given, the US Clean Coal Technology Program's activities in Poland are discussed, and the NOXSO flue gas cleanup process is outlined. Supplemental sections on events, special focuses, publication listings, etc. are also included.

  15. A computer program for deriving soil cleanup criteria

    International Nuclear Information System (INIS)

    Yu, C.

    1990-01-01

    The US Department of Energy (DOE) has issued a new order, DOE Order 5400.5, for Radiation Protection of the Public and the Environment. In this order, the DOE sets forth radiological protection guidelines for the cleanup of residual radioactive materials. Radionuclide concentrations and radioactivity levels have been established that are acceptable if a site is to be used without radiological restrictions. The guidelines can be categorized as either generic (site independent), that is, taken from existing radiation protection standards, or site specific, that is, derived from the basic dose limit using site-specific data and models. The generic guidelines for soil concentrations of 226 Ra, 228 Ra, 230 Th, and 232 Th adopted in DOE Order 5400.5 are generally consistent with US Environmental Protection Agency standards in Title 40, Code of Federal Regulations, Part 192. Procedures and data for deriving site-specific guidelines for other radionuclides in soil have been coded in a microcomputer program called RESRAD. The RESRAD code has been used by the DOE and its contractors to calculate postremediation doses and cleanup guidelines. The RESRAD code is a useful, easy to run, and very user-friendly tool

  16. Statistical aspects of the cleanup of Enewetak Atoll

    International Nuclear Information System (INIS)

    Giacomini, J.J.; Miller, F.L. Jr.

    1981-01-01

    The Desert Research Institute participated in the Enewetak Atoll Radiological Cleanup by providing data-base management and statistical analysis support for the Department of Energy team. The data-base management responsibilities included both design and implementation of a system for recording (in machine-retrievable form) all radiological measurements made during the cleanup, excluding personnel dosimetry. Statistical analyses were performed throughout the cleanup and were used to guide excavation activities

  17. 1997 DOE technical standards program workshop: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Department of Energy held its annual Technical Standards Program Workshop on July 8--10, 1997, at the Loews L`Enfant Plaza Hotel in Washington, DC. The workshop focused on aspects of implementation of the National Technology Transfer and Advancement Act of 1995 [Public Law (PL) 104-113] and the related revision (still pending) to OMB Circular A119 (OMB A119), Federal Participation in the Development and Use of Voluntary Standards. It also addressed DOE`s efforts in transitioning to a standards-based operating culture, and, through this transition, to change from a developer of internal technical standards to a customer of external technical standards. The workshop was designed to provide a forum to better understand how the new law is affecting Department activities. Panel topics such as ``Public Law 104-113 and Its Influence on Federal Agency Standards Activities`` and ``Update on Global Standards Issues`` provided insight on both the internal and external effects of the new law. Keynote speaker Richard Meier of Meadowbrook International (and formerly the Deputy Assistant US Trade Representative) addressed the subject of international trade balance statistics. He pointed out that increases in US export figures do not necessarily indicate increases in employment. Rather, increased employment results from product growth. Mr Meier also discussed issues such as the US migration to the sue of the metric system, the impact of budget limitations on Government participation in voluntary standards organizations, international standards ISO 9000 and ISO 14000, and DOE`s role in the worldwide transition from weapons production to cleanup.

  18. Cleanups In My Community (CIMC) - Recovery Act Funded Cleanups, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Recovery Act Funded Cleanup sites as part of the CIMC web service. The American Recovery and Reinvestment Act was signed into law...

  19. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    International Nuclear Information System (INIS)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.; Metzler, D.

    1994-01-01

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequately attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars

  20. DOE pursuing accelerated cleanup at Fernald

    International Nuclear Information System (INIS)

    Borgman, T.

    1996-01-01

    The timing is right, and officials at Fernald are ready to initiate final cleanup actions-at an accelerated pace. open-quotes We have a viable, aggressive plan in place that will reduce the risks associated with the site by accelerating the cleanup schedule, and save a lot of time and money in the process,close quotes said Don Ofte, president of the Fernald Environmental Restoration management Corporation (FERMCO). Ofte is referring to the accelerated cleanup plan that the U.S. Department of Energy has approved to complete the remediation of Fernald in approximately 10 years-instead of 25-30 years-at a cost savings to taxpayers of almost $3 billion. This article describes the scenario at Fernald and politically which has lead to this decision

  1. HARVESTING EMSP RESEARCH RESULTS FOR WASTE CLEANUP

    Energy Technology Data Exchange (ETDEWEB)

    Guillen, Donna Post; Nielson, R. Bruce; Phillips, Ann Marie; Lebow, Scott

    2003-02-27

    The extent of environmental contamination created by the nuclear weapons legacy combined with expensive, ineffective waste cleanup strategies at many U.S. Department of Energy (DOE) sites prompted Congress to pass the FY96 Energy and Water Development Appropriations Act, which directed the DOE to: ''provide sufficient attention and resources to longer-term basic science research, which needs to be done to ultimately reduce cleanup costs'', ''develop a program that takes advantage of laboratory and university expertise, and'' ''seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective.'' In response, the DOE initiated the Environmental Management Science Program (EMSP)-a targeted, long-term research program intended to produce solutions to DOE's most pressing environmental problems. EMSP funds basic research to lower cleanup cost and reduce risk to workers, the public, and the environment; direct the nation's scientific infrastructure towards cleanup of contaminated waste sites; and bridge the gap between fundamental research and technology development activities. EMSP research projects are competitively awarded based on the project's scientific, merit coupled with relevance to addressing DOE site needs. This paper describes selected EMSP research projects with long, mid, and short-term deployment potential and discusses the impacts, focus, and results of the research. Results of EMSP research are intended to accelerate cleanup schedules, reduce cost or risk for current baselines, provide alternatives for contingency planning, or provide solutions to problems where no solutions exist.

  2. Reliability of reactor plant water cleanup pumps

    International Nuclear Information System (INIS)

    Pearson, J.L.

    1979-01-01

    Carolina Power and Light Company's Brunswick 2 nuclear plant experienced a high reactor water cleanup pump-failure rate until inlet temperature and flow were reduced and mechanical modifications were implemented. Failures have been zero for about one year, and water cleanup efficiency has increased

  3. Approaching Environmental Cleanup Costs Liability Through Insurance Principles

    National Research Council Canada - National Science Library

    Corbin, Michael A

    1994-01-01

    .... Applying insurance industry principles to environmental cleanup costs liability will provide a firm foundation to reduce the risk of loss to the taxpayer, reduce cleanup costs, and stimulate private...

  4. Bioavailability: implications for science/cleanup policy

    Energy Technology Data Exchange (ETDEWEB)

    Denit, Jeffery; Planicka, J. Gregory

    1998-12-01

    This paper examines the role of bioavailability in risk assessment and cleanup decisions. Bioavailability refers to how chemicals ''behave'' and their ''availability'' to interact with living organisms. Bioavailability has significant implications for exposure risks, cleanup goals, and site costs. Risk to human health and the environment is directly tied to the bioavailability of the chemicals of concern.

  5. United States: Ukraine Technical Exchange II trip report

    International Nuclear Information System (INIS)

    Moak, D.J.; Wendling, M.A.

    1995-02-01

    May 15--21, 1994, the first technical conference was held at Hanford between Ukraine-Chornobyl, Westinghouse Hanford, and SAIC, to exchange technical information and experience gained in cleanup and stabilization of radioactive contamination at Hanford and Chornobyl. Protocol was signed for a second exchange and technology demonstration program in Kiev and near Chornobyl power plants. Technical Exchange No. 2 was held from August 28--September 9, 1994, with 3 focus areas: field demonstration of DOE-Hanford technologies and application to cleanup of contaminated lands resulting from 1986 Chornobyl accident; application of other US DOE-technologies; and observation/evaluation of Ukraine-developed technologies for potential application in USA. Three radiological mapping systems were demonstrated near Chornobyl: man-carried Ultrasonic Ranging and Data System, a mobile radiological data system, and NOMAD field gamma spectroscopy system. The Ukraine-Chornobyl team hosted technical presentations, discussions and field trips for 4.5 days, providing insight on the Chornobyl problem and allowing the US team to present overviews on DOE technologies that may be applicable to the Chornobyl situation. It is concluded that Ukrainian scientists have tremendous talent and expended considerable energy in attempting to tackle such a problem, but economic and cultural conditions with Ukraine have prevented them from acquiring the resources to implement basic aspects of characterization and remediation activities. Most of their publications are in Russian only. Their translation, plus resources to carry out proposals for bench scale and field demonstration projects, could benefit the DOE complex and other nuclear programs. The considerable cultural and economic change occurring in Ukraine, is providing opportunities for private industries to assist in the changes and for DOE, others to apply cleanup technologies, and it is essential that close institutional relations be established

  6. Non-technical issues in safety assessments for nuclear disposal facilities

    International Nuclear Information System (INIS)

    Kallenbach-Herbert, Beate; Brohmann, Bettina

    2010-09-01

    The paper highlights that a comprehensive approach to safety affords the consideration of technology, organisation, personnel and social environment. In several safety relevant contexts of nuclear waste disposal these fields are closely interrelated. The approach for the consideration of socio-scientific aspects which is sketched in this paper supports the systematic treatment of safety relevant non-technical issues in the safety case or in safety assessments for a disposal project. Furthermore it may foster the dialogue among specialists from the technical, the natural- and the socio-scientific field on questions of disposal safety. In this way it may contribute to a better understanding among the affected scientific disciplines in nuclear waste disposal.

  7. Research on Evaluation Methodology for High Temperature Components and Technical Issues

    International Nuclear Information System (INIS)

    Kim, Y.J.; Han, S.B.

    2007-03-01

    The research on evaluation methodology for high temperature components and technical issues includes the comparison of evaluation technology of Very High Temperature Reactors(VHTRs) with that of present commercial reactors, the review of Hot Gas Duct(HGD) insulation designs, the analysis of the codes related to VHTR component construction and the analysis of technical issues on application of present codes to HGD construction. Codes to assure the integrity of the VHTR components are not fully prepared yet in any country. To understand the evaluation technology of the VHTR-related codes, key requirements of ASME B and PV Code Section III, Subsection NB and NH were compared. Six kinds of HGD designs were reviewed and compared. A reference which analyzed seven kinds of present component codes were reviewed and the limitations of them were summarized. Especially it was found that the selection of materials is limited, material property data are not enough, and design analysis methodology is not fully specified

  8. Fitness for duty in the nuclear industry: Update of the technical issues 1996

    International Nuclear Information System (INIS)

    Durbin, N.; Grant, T.

    1996-05-01

    The purpose of this report is to provide an update of information on the technical issues surrounding the creation, implementation, and maintenance of fitness-for-duty (FFD) policies and programs. It has been prepared as a resource for Nuclear Regulatory Commission (NRC) and nuclear power plant personnel who deal with FFD programs. It contains a general overview and update on the technical issues that the NRC considered prior to the publication of its original FFD rule and the revisions to that rule (presented in earlier NUREG/CRs). It also includes chapters that address issues about which there is growing concern and/or about which there have been substantial changes since NUREG/CR-5784 was published. Although this report is intended to support the NRC's rule making on fitness for duty, the conclusions of the authors of this report are their own and do not necessarily represent the opinions of the NRC

  9. Hazards ahead: Managing cleanup worker health and safety at the nuclear weapons complex. Background paper

    International Nuclear Information System (INIS)

    1993-02-01

    Cold War nuclear weapons production has left a legacy of environmental contamination that is unprecented in scope and complexity. The Department of Energy has begun cleaning up pollution at the Nuclear Weapons Complex (NWC)--an expensive, decades-long task that will require a workforce numbering tens of thousands of scientists, technicians, and laborers. Protecting their health and safety must be a major goal of the cleanup effort. Achieving the goal will require DOE to successfully confront significant technical and managerial challenges, but it also poses a unique opportunity to advance state-of-the-art occupational health and safety technologies and practices. The report provides an evaluation of environmental restoration and waste management at the DOE Nuclear Weapons Complex. It examines risks workers might face in cleaning up contamination at the complex and evaluates the effectiveness of DOE's occupational safety and health programs for cleanup workers

  10. Briefing Products - Tools for Communicating Technical Issues to a Non-Technical Audience

    International Nuclear Information System (INIS)

    Clark, Harvey; Foster, Kevin T.

    2011-01-01

    Briefing Products are a new NARAC/IMAAC product line designed to communicate the consequences of a radiological, nuclear, chemical or biological agent incident to non-technical decision makers and key leaders. Each Briefing Product addresses a single decision or issue focused on potential actions that should be considered when responding to a hazard, while avoiding the use of technical or regulatory jargon. Briefing Products do not make protective action recommendations, although they do concretely assist decision-makers with development of their own protective actions by quoting or paraphrasing the published guidance relevant to the decision at hand. Briefing Products are produced in sets tailored to specific types of incident which together depict the key decisions and characteristics of the incident. Each Briefing Product in the set consists of three elements: (1) Primary Effects, (2) Key Points and (3) Presenter Notes. Both the Primary Effects and Key Points are ready for direct presentation, while the Presenter Notes are designed to provide background information to the presenter and are not for direct presentation to the audience. The Briefing Products themselves are alternative presentations of results from the customary standard NARAC/IMAAC technical products. Currently, Briefing Products are available for detonation of both RDDs (Radiological Dispersal Devices) and INDs (Improvised Nuclear Devices). A new set of products tailored to nuclear power plant (NPP) accidents is currently under development. This paper describes the scope, structure and content of the Briefing Product sets. Examples from the two sets of Briefing Products now available are presented.

  11. Radioactive Waste and Clean-up: Introduction

    International Nuclear Information System (INIS)

    Collard, G.

    2007-01-01

    The primary mission of the Radioactive Waste and Clean-up division is to propose, to develop and to evaluate solutions for a safe, acceptable and sustainable management of radioactive waste. The Radioactive Waste and Clean-up division programme consists in research, studies, development and demonstration aiming to realise the objective of Agenda 21 on sustainable development in the field of radioactive waste and rehabilitation on radioactively contaminated sites. Indeed, it participates in the realisation of an objective which is to ensure that radioactive wastes are safely managed, transported, stored and disposed of, with a view to protecting human health and the environment, within a wider framework of an interactive and integrated approach to radioactive waste management and safety. We believe that nuclear energy will be necessary for the sustainable development of mankind in the 21st century, but we well understand that it would not be maintained if it is not proven that within benefits of nuclear energy a better protection of the environment is included. Although the current waste management practices are both technically and from the environmental point of view adequate, efforts in relation of future power production and waste management technologies should be put on waste minimisation. Therefore, the new and innovative reactors, fuel cycle and waste management processes and installations should be designed so that the waste generation can be kept in minimum. In addition to the design, the installations should be operated so as to create less waste; consideration should be given e.g. to keeping water chemistry clean and other quality factors. SCK-CEN in general and the Radioactive Waste and Clean-up division in particular are present in international groups preparing the development of innovative nuclear reactors, as Generation 4 and INPRO. Because performance assessments are often black boxes for the public, demonstration is needed for the acceptation of

  12. All hazardous waste politics is local: Grass-roots advocacy and public participation in siting and cleanup decisions

    Energy Technology Data Exchange (ETDEWEB)

    Lowry, R.C.

    1998-12-31

    The combined effects of federalism and interest group pluralism pose particularly difficult problems for hazardous waste siting and cleanup decisions. Most national environmental groups have only limited involvement in local hazardous waste politics, while local grass-roots advocates have very different interests and sometimes are pitted against one another. Both the Environmental protection Agency and the Department of energy recently have begun to use site-specific citizen advisory boards at cleanup sites. This approach appears to improve communications at some sites, but does not address the issues of ``not in my back yard`` politics and alleged inequitable exposure to hazardous wastes.

  13. Oil spills and their cleanup

    International Nuclear Information System (INIS)

    Fingas, M.

    1995-01-01

    Oil spills are an unfortunately common occurrence in the world's seas and can have extensive damaging environmental consequences. This article examines various methods of cleaning up oil spills, evaluates their effectiveness in various situations, and identifies areas where, current methods being inadequate, further research is needed. Containment, mechanical removal, shoreline cleanup, chemical treating agents, in situ burning, natural recovery and enhanced bioremediation are all assessed. The cleanup method must be selected to match environmental conditions. Results are good in quiet, sheltered waters, but need extensive development in open waters and high seas. (UK)

  14. Regulatory Strategies To Minimize Generation Of Regulated Wastes From Cleanup, Continued Use Or Decommissioning Of Nuclear Facilities Contaminated With Polychlorinated Biphenyls (PCBS) - 11198

    International Nuclear Information System (INIS)

    Lowry, N.

    2010-01-01

    . Allowable options must be evaluated carefully in order to reduce compliance risks, protect personnel, limit potential negative impacts on facility operations, and minimize the generation of wastes subject to TSCA. This paper will identify critical factors in selecting the appropriate TSCA regulatory path in order to minimize the generation of radioactive PCB waste and reduce negative impacts to facilities. The importance of communicating pertinent technical issues with facility staff, regulatory personnel, and subsequently, the public, will be discussed. Key points will be illustrated by examples from five former production reactors at the DOE Savannah River Site. In these reactors a polyurethane sealant was used to seal piping penetrations in the biological shield walls. During the intense neutron bombardment that occurred during reactor operation, the sealant broke down into a thick, viscous material that seeped out of the piping penetrations over adjacent equipment and walls. Some of the walls were painted with a PCB product. PCBs from the paint migrated into the degraded sealant, creating PCB 'spill areas' in some of these facilities. The regulatory cleanup approach selected for each facility was based on its operational status, e.g., active, inactive or undergoing decommissioning. The selected strategies served to greatly minimize the generation of radioactive liquid PCB waste. It is expected that this information would be useful to other DOE sites, DOD facilities, and commercial nuclear facilities constructed prior to the 1979 TSCA ban on most manufacturing and uses of PCBs.

  15. Key technical issues associated with a method of pulse compression. Final technical report

    International Nuclear Information System (INIS)

    Hunter, R.O. Jr.

    1980-06-01

    Key technical issues for angular multiplexing as a method of pulse compression in a 100 KJ KrF laser have been studied. Environmental issues studied include seismic vibrations man-made vibrations, air propagation, turbulence, and thermal gradient-induced density fluctuations. These studies have been incorporated in the design of mirror mounts and an alignment system, both of which are reported. A design study and performance analysis of the final amplifier have been undertaken. The pulse compression optical train has been designed and assessed as to its performance. Individual components are described and analytical relationships between the optical component size, surface quality, damage threshold and final focus properties are derived. The optical train primary aberrations are obtained and a method for aberration minimization is presented. Cost algorithms for the mirrors, mounts, and electrical hardware are integrated into a cost model to determine system costs as a function of pulse length, aperture size, and spot size

  16. Pipeline abandonment - a discussion paper on technical and environmental issues

    International Nuclear Information System (INIS)

    1996-11-01

    The technical and environmental issues associated with pipeline abandonment were reviewed to provide a basis for the development of guidelines that companies could follow in order to abandon oil and gas pipelines in an environmentally safe and economic manner. Some of the topics discussed include land use management, ground subsidence, soil and groundwater contamination, erosion and the potential to create water conduits. A major issue still to be resolved, i.e., the legal and financial aspects of pipeline abandonment, was addressed. An industry-financed fund has been created to cover the cost of reclamation and abandonment of orphaned pipelines and certain associated pipeline facilities. 30 refs., 4 tabs., 3 figs

  17. Technical approach to groundwater restoration

    International Nuclear Information System (INIS)

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  18. Fitness for duty in the nuclear industry: Update of the technical issues 1996

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, N.; Grant, T. [eds.] [Battelle Seattle Research Center, WA (United States)

    1996-05-01

    The purpose of this report is to provide an update of information on the technical issues surrounding the creation, implementation, and maintenance of fitness-for-duty (FFD) policies and programs. It has been prepared as a resource for Nuclear Regulatory Commission (NRC) and nuclear power plant personnel who deal with FFD programs. It contains a general overview and update on the technical issues that the NRC considered prior to the publication of its original FFD rule and the revisions to that rule (presented in earlier NUREG/CRs). It also includes chapters that address issues about which there is growing concern and/or about which there have been substantial changes since NUREG/CR-5784 was published. Although this report is intended to support the NRC`s rule making on fitness for duty, the conclusions of the authors of this report are their own and do not necessarily represent the opinions of the NRC.

  19. Key issues and technical route of cyber physical distribution system

    Science.gov (United States)

    Zheng, P. X.; Chen, B.; Zheng, L. J.; Zhang, G. L.; Fan, Y. L.; Pei, T.

    2017-01-01

    Relying on the National High Technology Research and Development Program, this paper introduced the key issues in Cyber Physical Distribution System (CPDS), mainly includes: composite modelling method and interaction mechanism, system planning method, security defence technology, distributed control theory. Then on this basis, the corresponding technical route is proposed, and a more detailed research framework along with main schemes to be adopted is also presented.

  20. Design and operational experience with a portable tritium cleanup system

    International Nuclear Information System (INIS)

    Maienschein, J.L.; Wilson, S.W.; Garcia, F.

    1991-06-01

    We built a portable tritium cleanup system to scavenge tritium from contaminated gases in any tritium-containing system in the LLNL Tritium Facility. The cleanup system uses standard catalytic oxidation of tritium to water followed by water removal with a molecular sieve dryer. The cleanup unit, complete with instrumentation, is contained in a portable cart that is rolled into place and connected to the apparatus to be cleaned. The cleanup systems is effective, low-tech, simple, and reliable. The nominal flow rate of the system is 30 liters/minute, and the decontamination factor is > 1000. In this paper we will show design information on our portable cleanup system, and will discuss our operational experience with it over the past several years

  1. Louisiana's statewide beach cleanup

    Science.gov (United States)

    Lindstedt, Dianne M.; Holmes, Joseph C.

    1989-01-01

    Litter along Lousiana's beaches has become a well-recognized problem. In September 1987, Louisiana's first statewide beach cleanup attracted about 3300 volunteers who filled 16,000 bags with trash collected along 15 beaches. An estimated 800,173 items were gathered. Forty percent of the items were made of plastic and 11% were of polystyrene. Of all the litter collected, 37% was beverage-related. Litter from the oil and gas, commercial fishing, and maritime shipping industries was found, as well as that left by recreational users. Although beach cleanups temporarily rid Louisiana beaches of litter, the real value of the effort is in public participation and education. Civic groups, school children, and individuals have benefited by increasing their awareness of the problems of trash disposal.

  2. Cleanups in My Community

    Data.gov (United States)

    U.S. Environmental Protection Agency — Cleanups in My Community (CIMC) is a public web application that enables integrated access through maps, lists and search filtering to site-specific information EPA...

  3. Diabetes mellitus morbidity in Chernobyl clean-up workers

    International Nuclear Information System (INIS)

    Tolstaya, E.V.; Ermakova, D.P.; Glinskaya, T.N.

    2016-01-01

    Acute and total diabetes mellitus morbidity in Chernobyl clean-up workers was examined during 1995-2014 period. During all the period of investigations levels of acute and total morbidity were higher in clean-up workers, than in total Belarusian population. (authors)

  4. Next steps in the development of ecological soil clean-up values for metals.

    Science.gov (United States)

    Wentsel, Randall; Fairbrother, Anne

    2014-07-01

    This special series in Integrated Environmental Assessment Management presents the results from 6 workgroups that were formed at the workshop on Ecological Soil Levels-Next Steps in the Development of Metal Clean-Up Values (17-21 September 2012, Sundance, Utah). This introductory article presents an overview of the issues assessors face when conducting risk assessments for metals in soils, key US Environmental Protection Agency (USEPA) documents on metals risk assessment, and discusses the importance of leveraging from recent major terrestrial research projects, primarily to address Registration, Evaluation, Authorization and Restriction of Chemical Substances (REACH) requirements in Europe, that have significantly advanced our understanding of the behavior and toxicity of metals in soils. These projects developed large data sets that are useful for the risk assessment of metals in soil environments. The workshop attendees met to work toward developing a process for establishing ecological soil clean-up values (Eco-SCVs). The goal of the workshop was to progress from ecological soil screening values (Eco-SSLs) to final clean-up values by providing regulators with the methods and processes to incorporate bioavailability, normalize toxicity thresholds, address food-web issues, and incorporate background concentrations. The REACH data sets were used by workshop participants as case studies in the development of the ecological standards for soils. The workshop attendees discussed scientific advancements in bioavailability, soil biota and wildlife case studies, soil processes, and food-chain modeling. In addition, one of the workgroups discussed the processes needed to frame the topics to gain regulatory acceptance as a directive or guidance by Canada, the USEPA, or the United States. © 2013 SETAC.

  5. Gender Issues in Technical Communication Studies: An Overview of the Implications for the Profession, Research, and Pedagogy.

    Science.gov (United States)

    Allen, Jo

    1991-01-01

    Presents an overview of research and unanswered questions related to gender issues in technical communication. Addresses the consequences of the feminization of technical communication, research on gender differences in technical communication, and the means for encouraging a more gender-balanced view of business and industry. (SR)

  6. Cleanup procedures at the Nevada Test Site and at other radioactively contaminated sites including representative costs of cleanup and treatment of contaminated areas

    International Nuclear Information System (INIS)

    Talmage, S.S.; Chilton, B.D.

    1987-09-01

    This review summarizes available information on cleanup procedures at the Nevada Test Site and at other radioactively contaminated sites. Radionuclide distribution and inventory, size of the contaminated areas, equipment, and cleanup procedures and results are included. Information about the cost of cleanup and treatment for contaminated land is presented. Selected measures that could be useful in estimating the costs of cleaning up radioactively contaminated areas are described. 76 refs., 16 tabs

  7. Development of international criteria for the cleanup of contaminated areas

    International Nuclear Information System (INIS)

    Hedemann-Jensen, P.; Barraclough, I.; Meck, R.; Gnugnoli, G.; Stegnar, P.

    1999-01-01

    IAEA TECDOC-987, Application of radiation protection principles to the cleanup of contaminated areas, provides a coherent framework and consistent guidance needed for approaches to cleanup that encompass the entire range of contamination situations. A major goal of cleanup is usually to re-establish that the environment can acceptably support habitation and use. Difficult situations include chronic exposures due to radioactivity associated with the discovery of contamination from a previously discontinued practice and post-accident situations. and post-accident situations. The concepts of justification, optimization, and limitation can be applied to cleanup from 'trivial' to 'intolerable' situations by taking into account not only radiological risk, but the entire range of social values including the ability of the society to feed and shelter itself and to sustain a productive economy. TECDOC-987 proposes six ranges, or bands, of doses that correspond to trivial, acceptable, tolerable - clean-up unlikely (unless constrained), tolerable - clean-up likely, unacceptable, and intolerable risks. Remedial actions may vary from 'none' to elaborate decontamination or restricted or prohibited use. (author)

  8. Investigating Some Technical Issues on Cohesive Zone Modeling of Fracture

    Science.gov (United States)

    Wang, John T.

    2011-01-01

    This study investigates some technical issues related to the use of cohesive zone models (CZMs) in modeling fracture processes. These issues include: why cohesive laws of different shapes can produce similar fracture predictions; under what conditions CZM predictions have a high degree of agreement with linear elastic fracture mechanics (LEFM) analysis results; when the shape of cohesive laws becomes important in the fracture predictions; and why the opening profile along the cohesive zone length needs to be accurately predicted. Two cohesive models were used in this study to address these technical issues. They are the linear softening cohesive model and the Dugdale perfectly plastic cohesive model. Each cohesive model constitutes five cohesive laws of different maximum tractions. All cohesive laws have the same cohesive work rate (CWR) which is defined by the area under the traction-separation curve. The effects of the maximum traction on the cohesive zone length and the critical remote applied stress are investigated for both models. For a CZM to predict a fracture load similar to that obtained by an LEFM analysis, the cohesive zone length needs to be much smaller than the crack length, which reflects the small scale yielding condition requirement for LEFM analysis to be valid. For large-scale cohesive zone cases, the predicted critical remote applied stresses depend on the shape of cohesive models used and can significantly deviate from LEFM results. Furthermore, this study also reveals the importance of accurately predicting the cohesive zone profile in determining the critical remote applied load.

  9. A decision-making process on cleanup of contaminated surface soil

    International Nuclear Information System (INIS)

    Yasuda, Hiroshi

    1996-01-01

    This study presents principles for determining derived intervention levels (DILs) for surface soil cleanup. The people concerned were divided into major three groups: residents, responsible parties, and cleanup workers; it was considered that each group has different interests. The DILs for soil cleanup were determined from the viewpoints of these three groups: safety of residence, advantages of the countermeasures, and safety of cleanup activities, respectively. An example process for determination of the DILs in accordance with the principles was also presented for a site contaminated by 137 Cs. This decision-making frame is expected to be applicable to other contaminants. (author)

  10. A study on the regulatory approach of major technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Keun Sun; Oh, S. H.; Kang, H. J.; Kim, G. S. [Sunmoon Univ., Asan (Korea, Republic of); Lee, S. H.; Baek, W. P.; Yang, S. H.; Jeong, Y. H. [Korea Association for Nuclear Technology, Taejon (Korea, Republic of)

    1999-02-15

    This project is to provide the regulatory direction of 4 major technical issues for the Korean Next Generation Reactors, which are parts of major technical issues resulted from the safety regulation R and D on the KNGR. The outstanding results are are as follows : related to the classification and acceptance criteria of plant conditions, currently used classification and safety requirement were reviewed and regulatory direction was proposed. Among multiple failures, it is identified that SBO, TLOFW, multiple SGTR and ATWS are basically to be considered for additional requirements for advanced reactors. This study reviewed risk aspects, design consideration, and trends of safety requirements, and proposed fundamental safety requirements to be applied for KNGR. Multiple steam generator tube failure is a significant safety concern because of the possibility of release of radionuclides to the environment through containment bypass. Proposed safety requirement for this event can be categorized mainly as analysis requirement, design evaluation requirement and PSA requirement; For protection of containment failure, a reasonable safety position is necessary through and integrated review of possibility of severe accident occurrence, effects of sever accident mitigation features and cost effects of these design features. With this consideration safety requirements developed are the analysis requirement, provision of protective measures and survivability/availability of protective measures.

  11. Technical findings and regulatory analysis for Generic Safety Issue II.E.4.3, ''Containment Integrity Check''

    International Nuclear Information System (INIS)

    Serkiz, A.W.

    1988-04-01

    This report contains the technical findings and regulatory analysis for Generic Safety Issue II.E.4.3, ''Containment Integrity Check.'' An evaluation of the containment isolation history from 1965 to 1983 reveals that (except for a small number of events) containment integrity has been maintained and that the majority of reported events have been events related to exceeding Technical Specification limits (or 0.6 of the allowable leakage level). In addition, more recent risk analyses have shown that allowable leakage rates even if increased by a factor of 10 would not significantly increase risk. Potential methods of continuous monitoring are identified and evaluated. Therefore, these technical findings and risk evaluations support closure of Generic Safety Issue II.E.4.3

  12. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  13. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  14. Regulatory and management requirements for investigation-derived waste generated during environmental investigations and cleanups

    International Nuclear Information System (INIS)

    Clary, M.B.

    1994-01-01

    Environmental cleanup efforts often result in the generation of waste materials, such as soil samples, drill cuttings, decontamination water, drilling muds, personal protective equipment, and disposable sampling equipment. The management of associated with site characterization and remediation issues is a complicated issue at many CERCLA/RCRA facilities throughout the country, primarily because of the federal hazardous waste regulations. The hazardous waste regulations were intended to apply to the active generation of hazardous waste at industrial facilities and do not often make sense when applied to sites con by poor disposal practices of the past. In order to manage investigation derived waste in a more rational, logical manner, EPA issued guidance on the management of investigation-derived waste (IDW) at Superfund sites in January, 1992. The basic intent of the EPA guidance is to provide Superfund Site Managers with options for handling, managing, and disposing of IDW. The second part of this paper provides a detailed analysis of current IDW practices at various Department of Energy (DOE) facilities and Superfund sites across the nation. Some sites, particularly the DOE facilities, with more complicated on-going cleanup efforts have developed site-specific written procedures for managing IDW, often incorporating risk assessment. In come cases, these site-specific policies are going farther than the current EPA and Colorado policies in terms of conservatively managing IDW

  15. Evaluation of contaminated groundwater cleanup objectives

    International Nuclear Information System (INIS)

    Arquiett, C.; Gerke, M.; Datskou, I.

    1996-01-01

    The US Department of Energy's (DOE's) Environmental Restoration Program will be responsible for remediating the approximately 230 contaminated groundwater sites across the DOE Complex. A major concern for remediation is choosing the appropriate cleanup objective. The cleanup objective chosen will influence the risk to the nearby public during and after remediation; risk to remedial and non-involved workers during remediation; and the cost of remediation. This paper discusses the trends shown in analyses currently being performed at Oak Ridge National Laboratories' (ORNL's) Center for Risk Management (CRM). To evaluate these trends, CRM is developing a database of contaminated sites. This paper examines several contaminated groundwater sites selected for assessment from CRM's data base. The sites in this sample represent potential types of contaminated groundwater sites commonly found at an installation within DOE. The baseline risk from these sites to various receptors is presented. Residual risk and risk during remediation is reported for different cleanup objectives. The cost associated with remediating to each of these objectives is also estimated for each of the representative sites. Finally, the general trends of impacts as a function of cleanup objective will be summarized. The sites examined include the Savannah River site, where there was substantial ground pollution from radionuclides, oil, coal stockpiles, and other forms of groundwater contamination. The effects of various types of groundwater contamination on various types of future user is described. 4 refs., 3 figs., 2 tabs

  16. March 28, 1979 plus 42 months, or a status report on the TMI-2 cleanup program

    International Nuclear Information System (INIS)

    Dieckamp, Herman

    1982-01-01

    The author gives a general overview of the TMI-2 cleanup program, including regulatory, financial, and public or political aspects. He reviews some of the major technical accomplishments, including the controlled venting of krypton, processing of more than half a million gallons of water from the auxiliary building using the EPICOR-II process, decontamination of over 600,000 gallons of water from the containment building using the submerged demineralizer system, processing of water from the reactor coolant system, and manned entries into the containment building. Cleaning up after a major reactor accident is expensive, not only because of the hostile physical environment in which the work must be carried out, but also because of regulatory, political and public acceptance constraints. The technological ingredients of a cleanup program exist, but the task of assembling those ingredients, ensuring a balance between cost, schedule and risk, and selling the resulting program to regulators and the public is a demanding one

  17. Technical challenges in the qualitative ecological risk assessments performed on the Hanford Site operable units

    International Nuclear Information System (INIS)

    Probasco, K.M.

    1994-01-01

    Qualitative Risk Assessments (QRAS) have been selected as the method for providing the risk-driver indications for interim, remedial, and cleanup actions for the Hanford Site operable units' ecological risk assessments. This expedited response action path has been developed for the Hanford Site to facilitate time-critical decisions and generate immediate emergency cleanup actions. Tight budgets and aggressive time schedules are a major factor in the development of the QRA process. The QRA is a quick way to find immediate threats and a good precursor to a full risk assessment. However, numerous technical challenges have been identified with the QRA approach. The QRA approach differs from a baseline risk assessment in several ways. The main differences involve the use of data that have previously been gathered from the site, and the development of a ''bias-for-action'' document that would reveal qualitative risks from the contaminants identified at the operable units. Technical challenges concerning the ecological portion of these QRAs have raised questions about using the ORA for decision-making and may have weakened the validity of its use in the established procedural framework. Challenges involving such issues as the extrapolation of the contaminant data, data validation and screening techniques, receptor selections, and the final risk characterization outcome threaten the feasibility of the QRA as a decision-making tool. This discussion provides insight into resolving technical challenges and may be a ''lessons-learned'' device for those interested in the QRA approach. Ultimately, these challenges are proving to be learning tools for scientists, regulators, and ecologists and are identifying the data gaps and research direction for future ecological baseline risk assessments

  18. Impact of occupational issues on DOE's environmental restoration program

    International Nuclear Information System (INIS)

    Siegel, M.R.; Lesperance, A.M.; Smith, D.

    1992-01-01

    The U.S. Department of Energy (DOE) is in the midst of a 30-yr, multi-billion-dollar environmental restoration program for most of the facilities included in its nuclear weapons complex. Long-term planning efforts are under way to identify strategies and approaches for carrying out this extraordinarily complicated task. The DOE has already entered into interagency agreements with the U.S. Environmental Protection Agency and states for many of its environmental restoration sites. These agreements set legally enforceable deadlines for cleanup activities at these sites. In addition, DOE has made other commitments to Congress and the public regarding its environmental restoration schedule. Thousands of workers will be directly involved in environmental restoration activities at DOE sites. Cleanup activity will be carried out in environments involving potential exposure to highly toxic chemical substances and radionuclides. It is inevitable that occupational safety and health (OSH) issues will become both critical and highly visible to DOE. The OSH issues associated with cleanup activities will likely attract the attention of workers, unions, the media, regulators, and the public. This paper reviews three case studies describing OSH activities in DOE's environmental restoration program. These case studies will help alert DOE officials to ways that various OSH issues should be considered when planning environmental restoration activities. This activity is being coordinated with other DOE work to identify occupational requirements that are applicable to DOE cleanup work

  19. Non-technical Issues in Design and Development of Personal Portable Devices.

    Science.gov (United States)

    Lhotska, Lenka; Cheshire, Paul; Pharow, Peter; Macku, David

    2016-01-01

    Mobile technologies are constantly evolving and with the development of Internet of Things we can expect continuous increase of various applications. Mobile technologies have undeniable opportunities to play an important role in health services. Concerning purely technical aspects, almost every problem can be solved. However, there are still many unsolved and unclear issues related with ethics and governance mechanisms for mobile phone applications. These issues are even more critical in medical and health care applications of mobile technologies. This paper tries to analyse ethical, and privacy-related challenges that may occur when introducing Personal Portable Devices (PPD) to collect and record personal health data in health care and welfare environment.

  20. Dryland ecohydrology and climate change: critical issues and technical advances

    Directory of Open Access Journals (Sweden)

    L. Wang

    2012-08-01

    Full Text Available Drylands cover about 40% of the terrestrial land surface and account for approximately 40% of global net primary productivity. Water is fundamental to the biophysical processes that sustain ecosystem function and food production, particularly in drylands where a tight coupling exists between ecosystem productivity, surface energy balance, biogeochemical cycles, and water resource availability. Currently, drylands support at least 2 billion people and comprise both natural and managed ecosystems. In this synthesis, we identify some current critical issues in the understanding of dryland systems and discuss how arid and semiarid environments are responding to the changes in climate and land use. The issues range from societal aspects such as rapid population growth, the resulting food and water security, and development issues, to natural aspects such as ecohydrological consequences of bush encroachment and the causes of desertification. To improve current understanding and inform upon the needed research efforts to address these critical issues, we identify some recent technical advances in terms of monitoring dryland water dynamics, water budget and vegetation water use, with a focus on the use of stable isotopes and remote sensing. These technological advances provide new tools that assist in addressing critical issues in dryland ecohydrology under climate change.

  1. Planning for cleanup of large areas contaminated as a result of a nuclear accident

    International Nuclear Information System (INIS)

    1991-01-01

    The cleanup of large areas of contaminated as a result of an accident at a nuclear facility could cost hundreds of millions of dollars and cause inconvenience to the public. Such a cleanup programme would be undertaken only if the detriment to health and social life resulting from cleanup activities would be less than that resulting from further exposures. All reasonable means should, however, be used to minimize the costs and detriment to humans of such a cleanup. For such a cleanup to be carried out safely, efficiently and as quickly as possible under adverse conditions requires: Good preliminary and final planning; A cleanup team having a well defined management structure and well trained personnel; and Suitable cleanup methods and equipment and cleanup criteria. 35 refs, 8 figs, 5 tabs

  2. Options for improving hazardous waste cleanups using risk-based criteria

    International Nuclear Information System (INIS)

    Elcock, D.

    1995-01-01

    This paper explores how risk- and technology-based criteria are currently used in the RCRA and CERCLA cleanup programs. It identifies ways in which risk could be further incorporated into RCRA and CERCLA cleanup requirements and the implications of risk-based approaches. The more universal use of risk assessment as embodied in the risk communication and risk improvement bills before Congress is not addressed. Incorporating risk into the laws and regulations governing hazardous waste cleanup, will allow the use of the best scientific information available to further the goal of environmental protection in the United States while containing costs. and may help set an example for other countries that may be developing cleanup programs, thereby contributing to enhanced global environmental management

  3. 75 FR 68780 - Reliability Monitoring, Enforcement and Compliance Issues; Agenda for the Technical Conference

    Science.gov (United States)

    2010-11-09

    ... Commissioner-led Technical Conference on November 18, 2010 in the above-referenced proceeding to explore issues...://www.ferc.gov . Anyone with Internet access who desires to listen to this event can do so by navigating...

  4. KBS Annual Report 1982. Summaries of technical reports issued during 1982

    International Nuclear Information System (INIS)

    1983-07-01

    The purpose of the KBS Annual Report is to inform interested organizations and individuals of the research and development work perfomed by the division KBS within the Swedish Nuclear Fuel Supply Co. (SKBF) on the handling, treatment and final storage of nuclear wastes in Sweden. In the Annual Report for 1982 the summaries of 27 technical reports and other publications issued during the year are listed. (K.A.E.)

  5. (Review Draft) Radiation Site Cleanup Regulations: Technical Support Document For The Development Of Radionuclide Cleanup Levels For Soil

    Science.gov (United States)

    This document describes parts of the technical analysis being undertaken in support of standards that ensure certain sites are cleaned up to a level that is protective of human health and the environment before they are released for public use.

  6. Amine-based post-combustion CO2 capture in air-blown IGCC systems with cold and hot gas clean-up

    International Nuclear Information System (INIS)

    Giuffrida, A.; Bonalumi, D.; Lozza, G.

    2013-01-01

    Highlights: • Hot fuel gas clean-up is a very favorable technology for IGCC concepts. • IGCC net efficiency reduces to 41.5% when realizing post-combustion CO 2 capture. • Complex IGCC layouts are necessary if exhaust gas recirculation is realized. • IGCC performance does not significantly vary with exhaust gas recirculation. - Abstract: This paper focuses on the thermodynamic performance of air-blown IGCC systems with post-combustion CO 2 capture by chemical absorption. Two IGCC technologies are investigated in order to evaluate two different strategies of coal-derived gas clean-up. After outlining the layouts of two power plants, the first with conventional cold gas clean-up and the second with hot gas clean-up, attention is paid to the CO 2 capture station and to issues related to exhaust gas recirculation in combined cycles. The results highlight that significant improvements in IGCC performance are possible if hot coal-derived gas clean-up is realized before the syngas fuels the combustion turbine, so the energy cost of CO 2 removal in an amine-based post-combustion mode is less strong. In particular, IGCC net efficiency as high as 41.5% is calculated, showing an interesting potential if compared to the one of IGCC systems with pre-combustion CO 2 capture. Thermodynamic effects of exhaust gas recirculation are investigated as well, even though IGCC performance does not significantly vary against a more complicated plant layout

  7. High-level waste vitrification off-gas cleanup technology

    International Nuclear Information System (INIS)

    Hanson, M.S.

    1980-01-01

    This brief overview is intended to be a basis for discussion of needs and problems existing in the off-gas clean-up technology. A variety of types of waste form and processes are being developed in the United States and abroad. A description of many of the processes can be found in the Technical Alternative Documents (TAD). Concurrently, off-gas processing systems are being developed with most of the processes. An extensive review of methodology as well as decontamination factors can be found in the literature. Since it is generally agreed that the most advanced solidification process is vitrification, discussion here centers about the off-gas problems related to vitrification. With a number of waste soldification facilities around the world in operation, it can be shown that present technology can satisfy the present requirement for off-gas control. However, a number of areas within the technology base show potential for improvement. Fundamental as well as verification studies are needed to obtain the improvements

  8. Some challenges and issues in managing, and preserving access to, long-lived collections of digital scientific and technical data

    Directory of Open Access Journals (Sweden)

    W L Anderson

    2006-01-01

    Full Text Available One goal of the Committee on Data for Science and Technology is to solicit information about, promote discussion of, and support action on the many issues related to scientific and technical data preservation, archiving, and access. This brief paper describes four broad categories of issues that help to organize discussion, learning, and action regarding the work needed to support the long-term preservation of, and access to, scientific and technical data. In each category, some specific issues and areas of concern are described.

  9. Air pathway analysis for cleanup at the chemical plant area of the Weldon Spring site

    International Nuclear Information System (INIS)

    Chang, Y.S.

    1994-01-01

    The Weldon Spring site is a mixed waste site located in St. Charles County, Missouri. Cleanup of the site is in the planning and design stage, and various engineering activities were considered for remedial action, including excavating soils, dredging sludge, treating various contaminated media in temporary facilities, transporting and staging supplies and contaminated material, and placing waste in an engineered disposal cell. Both contaminated and uncontaminated emissions from these activities were evaluated to assess air quality impacts and potential health effects for workers and the general public during the cleanup period. A site-specific air quality modeling approach was developed to address several complex issues, such as a variety of emission sources, an array of source/receptor configurations, and complicated sequencing/scheduling. This approach can be readily adapted to reflect changes in the expected activities as engineering plans are finalized

  10. Report on the Current Technical Issues on ASME Nuclear Code and Standard

    International Nuclear Information System (INIS)

    Koo, Gyeong Hoi; Lee, B. S.; Yoo, S. H.

    2008-11-01

    This report describes the analysis on the current revision movement related to the mechanical design issues of the U.S ASME nuclear code and standard. ASME nuclear mechanical design in this report is composed of the nuclear material, primary system, secondary system and high temperature reactor. This report includes the countermeasures based on the ASME Code meeting for current issues of each major field. KAMC(ASME Mirror Committee) of this project is willing to reflect a standpoint of the domestic nuclear industry on ASME nuclear mechanical design and play a technical bridge role for the domestic nuclear industry in ASME Codes application

  11. Hot Gas Cleanup Test Facility for gasification and pressurized combustion. Quarterly report, October--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. The major emphasis during this reporting period was continuing the detailed design of the facility and integrating the particulate control devices (PCDs) into structural and process designs. Substantial progress in underground construction activities was achieved during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. MWK equipment at the grade level and the first tier are being set in the structure.

  12. Design of the JAERI Fuel Cleanup System for the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Konishi, Satoshi; Hayashi, Takumi; Naruse, Yuji; Okuno, Kenji; Carlson, R.V.; Anderson, J.L.

    1993-03-01

    TSTA is operated under the US-Japan collaboration program for the study of fusion fuel cycle technology. A plasma exhaust processing subsystem, JAERI Fuel Cleanup (JFCU) was fabricated in Japan, and installed at the TSTA as a major subsystem of the TSTA loop under the agreement. This process is based on some Japanese developed components, and designed to meet TSTA requirements by both parties. This document describes all the technical and safety features in accordance with the LANL QA format. The process has a capability to process simulated plasma exhaust at the flow rate of 15 mol/h, that is 1/5 for ITER. (author)

  13. Technical issues of fabrication technologies of reduced activation ferritic/martensitic steels

    International Nuclear Information System (INIS)

    Tanigawa, Hiroyasu; Sakasegawa, Hideo; Hirose, Takanori

    2013-01-01

    Highlights: • The key technical issues of RAFM steel fabrication are the control of Ta, and deoxidation of the steel with a limited amount of Al addition. • Addition of Ta with poor deoxidation might results in the agglomeration of inclusions at 1/2t position. • ESR was proved to be effective removing Ta oxide inclusions and avoiding agglomeration of inclusions at 1/2t position, and achieving low oxygen concentration. -- Abstract: The key issue for DEMO application is that Reduced activation ferritic/martensitic (RAFM) steels fabrication technologies has to be highly assured, especially with respect to high availability, reliability and reduced activation capability on the DEMO level fabrication, which requires not a few tons but thousand tons RAFM fabrication. One of the key technical issues of RAFM fabrication is the control of Ta, and deoxidation of the steel with a limited amount of Al addition. The series of F82H (Fe–8Cr–2W–V, Ta) melting revealed that Ta have tendency to form oxide on melting process, and this will have large impact on reliability of the steels. Al is also the key elements, as it is commonly used for deoxidation of steels, and achieving lower oxygen level is essential to obtain good mechanical properties, but the maximum concentration of Al is limited in view of reduced activation capability. These tendency and limitation resulted in the Ta oxide agglomeration in the middle of plate, but the remelting process, ESR (electro slag remelting), was found to be successful on removing those Ta oxides

  14. Methodology and data used for estimating the complex-wide impacts of alternative environmental restoration clean-up goals

    International Nuclear Information System (INIS)

    Shay, M.R.; Short, S.M.; Stiles, D.L.

    1994-03-01

    This paper describes the methodologies and data used for estimating the complex-wide impacts of alternative strategies for conducting remediation of all DOE sites and facilities, but does not address issues relating to Waste Management capabilities. Clean-up strategies and their corresponding goals for contaminated media may be driven by concentration-based regulatory standards, land-use standards (e.g., residential, industrial, wild life reserve, or totally restricted), risk-based standards, or other standards determined through stakeholder input. Strategies implemented to achieve these goals usually require the deployment of (a) clean-up technologies to destroy, remove, or contain the contaminants of concern; (b) institutional controls to prevent potential receptors from coming into contact with the contaminants; or (c) a combination of the above

  15. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  16. Utilizing the right mix of environmental cleanup technologies

    International Nuclear Information System (INIS)

    Whitaker, Wade; Bergren, Chris; Flora, Mary

    2007-01-01

    The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units that are required by environmental regulations, to undergo characterization and, if needed, remediation. In the initial years of the SRS environmental cleanup program (early 1990's), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical / pH-adjusting injection, phyto-remediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baro-balls, electrical resistance heating, soil vapor extraction, and micro-blowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works pro-actively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup

  17. UTILIZING THE RIGHT MIX OF ENVIRONMENTAL CLEANUP TECHNOLOGIES

    International Nuclear Information System (INIS)

    Bergren, C; Wade Whitaker, W; Mary Flora, M

    2007-01-01

    The Savannah River Site (SRS) Figure 1 is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units that are required by environmental regulations, to undergo characterization and, if needed, remediation. In the initial years of the SRS environmental cleanup program (early 1990s), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical/pH-adjusting injection, phytoremediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baroballs, electrical resistance heating, soil vapor extraction, and microblowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works proactively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup

  18. Worldwide analysis of marine oil spill cleanup cost factors

    International Nuclear Information System (INIS)

    Etkin, D.S.

    2000-01-01

    The many factors that influence oil spill response costs were discussed with particular emphasis on how spill responses differ around the world because of differing cultural values, socio-economic factors and labor costs. This paper presented an analysis of marine oil spill cleanup costs based on the country, proximity to shoreline, spill size, oil type, degree of shoreline oiling and cleanup methodology. The objective was to determine how each factor impacts per-unit cleanup costs. Near-shore spills and in-port spills were found to be 4-5 times more expensive to clean than offshore spills. Responses to spills of heavy fuels also cost 10 times more than for lighter crudes and diesel. Spill responses for spills under 30 tonnes are 10 times more costly than on a per-unit basis, for spills of 300 tonnes. A newly developed modelling technique that can be used on different types of marine spills was described. It is based on updated cost data acquired from case studies of more than 300 spills in 40 countries. The model determines a per-unit cleanup cost estimation by taking into consideration oil type, location, spill size, cleanup methodology, and shoreline oiling. It was concluded that the actual spill costs are totally dependent on the actual circumstances of the spill. 13 refs., 10 tabs., 3 figs

  19. Governance of Technical Education in India : Key Issues, Principles, and Case Studies

    OpenAIRE

    Blom, Andreas; Cheong, Jannette

    2010-01-01

    Tertiary education, and in particular technical and engineering education, is critical to India's aspirations of strengthening its reputation as a major competitive player in the Global knowledge economy. The system is huge and complex, and there is a consensus that reforms are imperative. Issues of fair access and affordable participation in higher education are critical if India is to em...

  20. Technical issues of electric nanopulse contact lithotripsy as factors affecting lithotripsy effectiveness and probe resourses

    Directory of Open Access Journals (Sweden)

    L. Yu. Ivanova

    2012-01-01

    Full Text Available To assess the relationship of main technical issues of electric nanopulse contact lithotripsy (CLT with lithotripsy effectiveness and lithotripsy resources of probe.Electric nanopulses were transmitted by the flexible probes and the lithotripter «Urolit». The relationship between lithotripsy effectiveness and tip diameter of probes, pulse energy, pulse frequency was assessed, and resources of lithotripsy probes with different diameters of the tip were analyzed.Sufficient number of electric nanopulse to destroy stone models was less when tip diameter, nanopulse energy and frequency were greater.Effectiveness of electric nanopulse CLT can be enhanced with the increase of nanopulse energy, frequency and probe diameter. Complex correction of technical issues of electric nanopulse CLT can be a way of probe resources saving.

  1. Socio-technical issues and challenges in implementing safe patient handovers: insights from ethnographic case studies.

    Science.gov (United States)

    Balka, Ellen; Tolar, Marianne; Coates, Shannon; Whitehouse, Sandra

    2013-12-01

    Ineffective handovers in patient care, including those where information loss occurs between care providers, have been identified as a risk to patient safety. Computerization of health information is often offered as a solution to improve the quality of care handovers and decrease adverse events related to patient safety. The purpose of this paper is to broaden our understanding of clinical handover as a patient safety issue, and to identify socio-technical issues which may come to bear on the success of computer based handover tools. Three in depth ethnographic case studies were undertaken. Field notes were transcribed and analyzed with the aid of qualitative data analysis software. Within case analysis was performed on each case, and subsequently, cross case analyses were performed. We identified five types of socio-technical issues which must be addressed if electronic handover tools are to succeed. The inter-dependencies of these issues are addressed in relation to arenas in which health care work takes place. We suggest that the contextual nature of information, ethical and medico-legal issues arising in relation to information handover, and issues related to data standards and system interoperability must be addressed if computerized health information systems are to achieve improvements in patient safety related to handovers in care. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  2. Review of technical issues related to the failure of Rosemount pressure transmitters due to fill oil loss. Final report

    International Nuclear Information System (INIS)

    James, R.W.; Gaertner, J.P.; Burns, E.T.; Horn, A.; Lee, L.K.

    1994-08-01

    Rosemount pressure transmitters are extensively used in both safety and non-safety applications in US nuclear power plants. They are used to measure pressure, flow, and water level. Rosemount pressure transmitter models 1151, 1152, 1153A, 1153, and 1154 use a fill oil to hydraulically transmit process pressure exerted on outer isolating diaphragms to internal diaphragms. The resulting deflection of the internal diaphragms changes the distance between them and a central diaphragm separating the transmitter interior into two volumes. The change in distance is measured as a change in electrical capacitance between the isolating diaphragms and the central diaphragm and can be related to differential pressure. The fill oil also functions as a dielectric. It has been well established that this fill oil can potentially leak over time, decreasing transmitter accuracy and increasing transmitter response time. Ultimately, the transmitter can fail. An extensive effort has been expended by the nuclear power industry collectively to analyze this issue and develop technically sound and reasonable requirements to mitigate the effects of oil loss in Rosemount pressure transmitters. Despite this, technical concerns have still been raised regarding the technical validity of the past analyses of this problem and its scope. In May 1993, the NRC created an internal group to comprehensively review the Rosemount issue and the NRC's action in addressing it to ensure that all available technical information has been considered. Because this issue remains of active technical interest and because the past work on this subject has been done by many different groups and organizations, EPRI has prepared this report to thoroughly document the current technical understanding of this issue, to perform additional analysis, and to identify any appropriate additional technical research activities regarding oil loss in Rosemount pressure transmitters

  3. Sectored Clean-up Work Plan for Housekeeping Category Waste Sites

    International Nuclear Information System (INIS)

    Nacht, S. J.

    2000-01-01

    The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs

  4. Electronic Scholarly Journals: A Review of Technical Issues in Digital Environment

    Directory of Open Access Journals (Sweden)

    Golnessa Galyani Moghaddam

    2006-12-01

    Full Text Available Scholarly journals are known as the most important medium for scholarly communication since long time back. As technology transforms the flow of information and idea everywhere, it changes the nature of scholarly communications and publishing of scholarly journals as well. The electronic scholarly publishing rapidly produced an expectation, among researchers of the availability of articles at their desktop, rather than the previous scenario of visiting the library to read a print journal issue. There are lots of technological improvements in electronic journals publishing. The present paper looks at some of technical issues in electronic publishing such as DOI, DOI-X, CrossRef, Citation/Reference Linking, OpenURL, SFX and MetaLib which are being used in the World Wide Web.

  5. The Role Of Land Use In Environmental Decision Making At Three DOE Mega-Cleanup Sites, Fernald, Rocky Flats, and Mound

    International Nuclear Information System (INIS)

    Jewett, M.A.

    2011-01-01

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  6. A study on technical issues of materials and design bases in ASME section III subsection NH code

    International Nuclear Information System (INIS)

    Lee, Hyeong Yeon; Kim, Jong Bum; Yoo, Bong

    2000-12-01

    In this study, an analysis of evaluation report by ORNL on the technical issues of elevated temperatures design guide line, ASME Code Section III Subsection NH was conducted and a brief evaluation procedure of the creep-fatigue damage was presented. ORNL published the report in 1993 and reviewed the issue areas where code rules or regulatory guides may be lacking or inadequate to ensure safe operation over the expected life cycles for liquid metal reactor systems. From historical viewpoint of the ASME NH code development, ASME Code Case 47 was changed much in 1989 edition, which includes the stress relaxation behavior in creep damage evaluation. Afterwards the 1992 version of CC N-47 was upgraded to Subsection NH in 1995 edition, which is the same with that of CC N-47 1992 edition except few material data. This report brings up the technical and regulatory issues that can not guarantee the safe and reliable operation of the ALMR which got the conceptual design certification from NRC. Twenty three technical issues were raised and settlement methodology were proposed. Additionally, the status of items approved by ASME code subgroup of elevated temperature design committee for the revision of the most recent 1998 edition of ASME NH was described

  7. A systematic assessment of the state of hazardous waste clean-up technologies

    International Nuclear Information System (INIS)

    Berg, M.T.; Reed, B.E.; Gabr, M.

    1993-07-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ''Decontamination Systems Information and Research Programs.'' Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushing (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming

  8. 40 CFR 312.25 - Searches for recorded environmental cleanup liens.

    Science.gov (United States)

    2010-07-01

    ... cleanup liens. 312.25 Section 312.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS INNOCENT LANDOWNERS, STANDARDS FOR... cleanup liens. (a) All appropriate inquiries must include a search for the existence of environmental...

  9. Review of State Soil Cleanup Levels for Dioxin (December 2009)

    Science.gov (United States)

    This final report summarizes a survey of state soil cleanup levels for dioxin and characterizes the science underlying these values. The objective of this project was to summarize existing state cleanup levels for dioxin in soil, together with their scientific bases where availa...

  10. Technical issues related to NUREG 0800, Chapter 18: Human Factors Engineering/Standard Review Plan

    International Nuclear Information System (INIS)

    Savage, J.W.

    1982-01-01

    The revision of Chapter 18 of NUREG 0800, Human Factors Engineering Standard Review Plan (SRP) will be based on SECY 82-111 and guidance contained in NUREG 0700, NUREG 0801 and NUREG 0835, plus other references. In conducting field reviews of control rooms, the NRC has identified technical issues which can be used to enhance the development of the revised version of NUREG 0800, and to establish priorities among the list of possible Branch Technical Positions (BTP) in NUREG 0800, Rev. 0, Table 18.0-2. This report is a compilation of comments and suggestions from the people who used NUREG 0700 in the Control Room field reviews. This information was used to establish possible BTP topic priorities so that the most important BTPs could be issued first. The comments and suggestions are included for HFEB review in conjunction with the table of priorities

  11. Technical and socio-political issues in radioactive waste disposal 1986. Vol. 1

    International Nuclear Information System (INIS)

    Parker, F.L.; Kasperson, R.E.; Andersson, T.L.; Parker, S.A.

    1987-11-01

    The purpose of the study was to provide an integrated technical and socio-political analysis of how six countries (Federal Republic of Germany, France, Sweden, Switzerland, United Kingdom and the United States of America) have responded to four key issues in radioactive waste management: a) What constitutes 'safe' or 'absolutely safe' disposal, b) site selection processes, c) timing and type of interim storage. (orig./HP)

  12. Cleanup around an old waste site

    International Nuclear Information System (INIS)

    Vandergaast, G.; Moffett, D.; Lawrence, B.E.

    1988-01-01

    42,500 m 3 of contaminated soil were removed from off-site areas around an old, low-level radioactive waste site near Port Hope, Ontario. The cleanup was done by means of conventional excavation equipment to criteria developed by Eldorado specific to the land use around the company's waste management facility. These cleanup criteria were based on exposure analyses carried out for critical receptors in two different scenarios. The excavated soils, involving eight different landowners, were placed on the original burial area of the waste management facility. Measures were also undertaken to stabilize the soils brought on-site and to ensure that there would be no subsequent recontamination of the off-site areas

  13. Environmental compliance and cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the roles of the principal agencies, organizations, and public in environmental compliance and cleanup of the Hanford Site. Regulatory oversight, the Federal Facility Agreement and Consent Order, the role of Indian tribes, public participation, and CERCLA Natural Resource Damage Assessment Trustee Activities are all discussed.

  14. Environmental compliance and cleanup

    International Nuclear Information System (INIS)

    Black, D.G.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the roles of the principal agencies, organizations, and public in environmental compliance and cleanup of the Hanford Site. Regulatory oversight, the Federal Facility Agreement and Consent Order, the role of Indian tribes, public participation, and CERCLA Natural Resource Damage Assessment Trustee Activities are all discussed

  15. Technical and Ethical Issues in Indicator Systems

    Directory of Open Access Journals (Sweden)

    Carol Taylor Fitz-Gibbon

    2002-01-01

    Full Text Available Most indicator systems are top-down, published, management systems, addressing primarily the issue of public accountability. In contrast we describe here a university-based suite of "grass-roots," research-oriented indicator systems that are now subscribed to, voluntarily, by about 1 in 3 secondary schools and over 4,000 primary schools in England. The systems are also being used by groups in New Zealand, Australia and Hong Kong, and with international schools in 30 countries. These systems would not have grown had they not been cost-effective for schools. This demanded the technical excellence that makes possible the provision of one hundred percent accurate data in a very timely fashion. An infrastructure of powerful hardware and ever-improving software is needed, along with extensive programming to provide carefully chosen graphical and tabular presentations of data, giving at-a-glance comparative information. Highly skilled staff, always learning new techniques, have been essential, especially as we move into computer-based data collection. It has been important to adopt transparent, readily understood methods of data analysis where we are satisfied that these are accurate, and to model the processes that produce the data. This can mean, for example, modelling separate regression lines for 85 different examination syllabuses for one age group, because any aggregation can be shown to represent unfair comparisons. Ethical issues are surprisingly often lurking in technical decisions. For example, reporting outcomes from a continuous measure in terms of the percent of students who surpassed a certain level, produces unethical behavior: a concentration of teaching on borderline students. Distortion of behavior and data corruption are ever-present concerns in indicator systems. The systems we describe would have probably failed to thrive had they not addressed schools' on-going concerns about education. Moreover, data interpretation can only be

  16. Accelerating cleanup. Paths to closure Hanford Site

    International Nuclear Information System (INIS)

    Edwards, C.

    1998-01-01

    This document was previously referred to as the Draft 2006 Plan. As part of the DOE's national strategy, the Richland Operations Office's Paths to Closure summarizes an integrated path forward for environmental cleanup at the Hanford Site. The Hanford Site underwent a concerted effort between 1994 and 1996 to accelerate the cleanup of the Site. These efforts are reflected in the current Site Baseline. This document describes the current Site Baseline and suggests strategies for further improvements in scope, schedule and cost. The Environmental Management program decided to change the name of the draft strategy and the document describing it in response to a series of stakeholder concerns, including the practicality of achieving widespread cleanup by 2006. Also, EM was concerned that calling the document a plan could be misconstrued to be a proposal by DOE or a decision-making document. The change in name, however, does not diminish the 2006 vision. To that end, Paths to Closure retains a focus on 2006, which serves as a point in time around which objectives and goals are established

  17. Prioritization of environmental cleanup problems at Hanford

    International Nuclear Information System (INIS)

    Fassbender, L.L.

    1994-01-01

    New technologies and scientific research are needed to clean up the Hanford Site. However, there is insufficient funding to develop every technology that is identified or to undertake every scientific research project that is proposed. Thus, the Department of Energy (DOE) must focus its resources on science and technology (S ampersand T) that will have the most significant impacts on the overall cleanup effort. Hanford has recognized the importance of identifying and prioritizing its most critical problems and the most promising solutions to them. Hanford cleanup will require numerous decisions about technology development and implementation, which will be complicated because there are substantial uncertainties about the risks and the costs of new technologies. Further, the choice of a specific technology for a specific application must be evaluated with respect to multiple (and often conflicting) objectives (e.g., risk reduction, increasing effectiveness, cost reduction, increasing public acceptability, regulatory compliance). This paper provides an overview of the decision analysis methodology that was used to prioritize S ampersand T needs for Hanford cleanup

  18. Providing support for day-to-day monitoring of shoreline cleanup operations

    International Nuclear Information System (INIS)

    Lamarche, A.; Tarpley, J.

    1997-01-01

    Experiences gained during the 'Cape Mohican' incident in October 1996, in San Francisco Bay, were recounted and proposed as a potential example of day-to-day monitoring, evaluation and reporting of shoreline cleanup effort. During this cleanup a set of communications procedures, progress reports and maps were developed which should be equally useful in other similar situations. The cartographic representations were specially highlighted as they focused on ways to provide a clear picture of the short term modifications in oiling conditions of the affected shoreline. The most important lesson learned from this oil spill was the importance of having personnel and equipment sufficiently matched to the task in order to evaluate oil conditions, produce cleanup recommendations, execute and communicate the status of the cleanup effort as fast, and as efficiently and effectively as possible. It was clearly demonstrated that unless the decision process is streamlined and supported with the best, most up-to-date information, the efforts of the cleanup team would be seriously undermined. 8 refs., 2 tabs., 6 figs

  19. Independent technical review of Savannah River Site Defense Waste Processing Facility technical issues

    International Nuclear Information System (INIS)

    1992-07-01

    The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) will vitrify high-level radioactive waste that is presently stored as liquid, salt-cake, and sludge in 51 waste-storage tanks. Construction of the DWPF began in 1984, and the Westinghouse Savannah Company (WSRC) considers the plant to be 100% turned over from construction and 91% complete. Cold-chemical runs are scheduled to begin in November 1992, and hot start up is projected for June 1994. It is estimated that the plant lifetime must exceed 15 years to complete the vitrification of the current, high-level tank waste. In a memo to the Assistant Secretary for Defense Programs (DP-1), the Assistant Secretary for Environmental Restoration and Waste management (EM-1) established the need for an Independent Technical Review (ITR), or the Red Team, to ''review process technology issues preventing start up of the DWPF.'' This report documents the findings of an Independent Technical Review (ITR) conducted by the Department of Energy (DOE), Office of Environmental Restoration and Waste Management (EM), at the request of the Assistant Secretary for Environmental Restoration and Waste Management, of specified aspects of Defense Waste Process Facility (DWPF) process technology. Information for the assessment was drawn from documents provided to the ITR Team by the Westinghouse Savannah River Company (WSRC), and presentations, discussions, interviews, and tours held at the Savannah River Site (SRS) during the weeks of February and March 9, 1992

  20. Cleanup of contaminated areas; La bonifica di aree contaminate

    Energy Technology Data Exchange (ETDEWEB)

    Beone, G; Carbone, A I; Zagaroli, M [ENEA - Dipartimento Protezione Ambientale e Salute dell' Uomo, Centro Ricerche Energia, Casaccia (Italy)

    1989-01-15

    The paper deals with the problem of contaminated areas cleanup, in order to eliminate every possible damage for man safety and environment and to site recovery for some utilization, The first step of cleanup operation is site characterization, that is followed by a pianificazion activity for a better definition of staff qualification, technology to be used, protection and prevention instruments for the risks due to contaminants handling. The second section describes the different remedial technologies for contaminated sites. Remedial technologies may be divided into on-site/off-site and in-situ treatments, according to whether materials (waste, soil, water) are moved to another location or not, respectively. Finally, it is outlined that contaminated areas cleanup is a typical multidisciplinary activity because very different competences are required. (author)

  1. Buying time: Franchising hazardous and nuclear waste cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Hale, D.R. [Dept. of Energy, Washington, DC (United States)

    1997-05-01

    This paper describes a private franchise approach to long-term custodial care, monitoring and eventual cleanup of hazardous and nuclear waste sites. The franchise concept could be applied to Superfund sites, decommissioning commercial reactors and safeguarding their wastes and to Department of Energy sites. Privatization would reduce costs by enforcing efficient operations and capital investments during the containment period, by providing incentives for successful innovation and by sustaining containment until the cleanup`s net benefits exceed its costs. The franchise system would also permit local governments and citizens to demand and pay for more risk reduction than provided by the federal government. In principle, they would have the option of taking over site management. The major political drawback of the idea is that it requires society to be explicit about what it is willing to pay for now to protect current and future generations. Hazardous waste sites are enduring legacies of energy development. Abandoned mines, closed refineries, underground storage tanks and nuclear facilities have often become threats to human health and water quality. The policy of the United States government is that such sites should quickly be made nonpolluting and safe for unrestricted use. That is, the policy of the United States is prompt cleanup. Orphaned commercial hazardous waste sites are addressed by the US Environmental Protection Agency`s Superfund program. 17 refs., 2 tabs.

  2. Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 9: Mixed Alcohols From Syngas -- State of Technology

    Energy Technology Data Exchange (ETDEWEB)

    Nexant Inc.

    2006-05-01

    This deliverable is for Task 9, Mixed Alcohols from Syngas: State of Technology, as part of National Renewable Energy Laboratory (NREL) Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Task 9 supplements the work previously done by NREL in the mixed alcohols section of the 2003 technical report Preliminary Screening--Technical and Economic Assessment of Synthesis Gas to Fuels and Chemicals with Emphasis on the Potential for Biomass-Derived Syngas.

  3. Disposal of waste from the cleanup of large areas contaminated as a result of a nuclear accident

    International Nuclear Information System (INIS)

    1992-01-01

    The report provides an overview of the methodology and technology available to load, transport and dispose of large volumes of contaminated material arising from the cleanup of areas after a nuclear accident and includes data on the planning, implementation, management and costing of such activities. To demonstrate the use of this information, three cleanup and disposal scenarios are examined, ranging from disposal in many small mounds or trenches within the contaminated area to disposal in a large facility away from the plant. As in the two companion reports, it is assumed that the population has been evacuated from the affected area. The report reviews the generic types of low level radioactive waste which are likely to arise from such a cleanup. The report does not deal with the recovery and disposal of intermediate and high level radioactive material on or near the plant site. This material will have to be recovered, packaged, transported and stored on-site or disposed of at an appropriate facility. These operations should be done by specialist teams using shielded or remotely operated equipment. Also not included are methods of in situ stabilization of contamination, for example ploughing to bury the top contaminated layer at a suitable depth. These techniques, which are likely to be widely used in part of the evacuated are, are discussed in IAEA Technical Reports Series No. 300, Vienna, 1989. 50 refs, 18 figs, 4 tabs

  4. Power systems development facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This quarterly technical progress report summarizes work completed during the last quarter of the Second Budget Period, January 1 through March 31, 1994, entitled {open_quotes}Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.{close_quotes} The objective of this project is to evaluate hot gas particulate control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

  5. Report on DOE labs takes aim at cleanup

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This article is a review of the Galvin report on the environmental restoration activities at DOE nuclear facilities. The report is highly critical of DOE efforts, calling for a management overhaul and partial privitization of some facilities. Urging that the facilities be more integrated into the environmental management program, the report asserts that the low quality of science and technology in field cleanup work is the most important reason for the limited pace of cleanup activities. Excessive administrative costs were also cited

  6. Technical issues and solutions on ITER first wall beryllium application. Industrial viewpoint

    International Nuclear Information System (INIS)

    Iwadachi, T.; Uda, M.; Ito, M.; Miyakawa, M.; Ibuki, M.

    2004-01-01

    Beryllium is selected as reference armor material of ITER primary first wall and is joined to the copper alloy heat sink such as CuCrZr or Dispersion Strengthened Copper (DSCu) Various joining technologies have been successfully developed and the manufacturing possibilities of large size first wall panels with beryllium armor has been demonstrated. Based on such results, further technical improvement is needed to reduce manufacturing cost and ensure the reliability of joining in actual size first wall. The technical issues to optimize the fabrication process of beryllium attachment were shown in this paper from an industrial point of view. Determination of the optimum size and the surface qualities of beryllium tiles are important issues in term of the material specification to ensure joining reliability and to reduce cost. The consolidation method and the finish machining methods of beryllium tiles are also critical in terms of material cost. These items should be determined by paying concern to the accommodation of the joining methods. The selections of slitting methods for attached beryllium have a great influence on fabrication cost. In the actual fabrication of beryllium attachment, safety provisions for exposure to beryllium in working environment and the recycling of the waste from the fabrication processes will be concerned sufficiently. (author)

  7. Cleanup standards and pathways analysis methods

    International Nuclear Information System (INIS)

    Devgun, J.S.

    1993-01-01

    Remediation of a radioactively contaminated site requires that certain regulatory criteria be met before the site can be released for unrestricted future use. Since the ultimate objective of remediation is to protect the public health and safety, residual radioactivity levels remaining at a site after cleanup must be below certain preset limits or meet acceptable dose or risk criteria. Release of a decontaminated site requires proof that the radiological data obtained from the site meet the regulatory criteria for such a release. Typically release criteria consist of a composite of acceptance limits that depend on the radionuclides, the media in which they are present, and federal and local regulations. In recent years, the US Department of Energy (DOE) has developed a pathways analysis model to determine site-specific soil activity concentration guidelines for radionuclides that do not have established generic acceptance limits. The DOE pathways analysis computer code (developed by Argonne National Laboratory for the DOE) is called RESRAD (Gilbert et al. 1989). Similar efforts have been initiated by the US Nuclear Regulatory Commission (NRC) to develop and use dose-related criteria based on genetic pathways analyses rather than simplistic numerical limits on residual radioactivity. The focus of this paper is radionuclide contaminated soil. Cleanup standards are reviewed, pathways analysis methods are described, and an example is presented in which RESRAD was used to derive cleanup guidelines

  8. Myelodysplastic syndromes in Chernobyl clean-up workers.

    Science.gov (United States)

    Gluzman, Daniil F; Sklyarenko, Lilia M; Koval, Stella V; Rodionova, Nataliia K; Zavelevich, Michael P; Ivanivskaya, Tetiana S; Poludnenko, Liudmyla Yu; Ukrainskaya, Nataliia I

    2015-10-01

    The studies of the recent decades posed the question of the association between radiation exposure and myelodysplastic syndromes (MDS). This association has been proved in secondary MDS originating upon exposure to chemotherapeutics and/or radiation therapy. The long-term study in Japanese atomic (A)-bomb survivors demonstrated the significant linear dose-response for MDS confirming the link between radiation exposure and this form of hematopoietic malignancies. All these findings provide the strong basis for studying MDS in the persons exposed to radiation following the Chernobyl disaster, especially those in the cohort of Chernobyl clean-up workers of 1986-1987. The data on MDS among Chernobyl clean-up workers (1986-1987) diagnosed in 1996-2012 at the reference laboratory of RE Kavetsky Institute of Experimental Pathology, Oncology and Radiobiology are summarized. MDS cases were diagnosed in 23 persons (21 males and 2 females) having been exposed to radiation as clean-up workers of 1986-1987. Refractory anemia (RA) has been detected in 13, refractory anemia with ring sideroblasts (RARS)-in 2, and refractory anemia with excess blasts (RAEB)-in 8 patients. The median age of those MDS patients was 62.0 years. In addition, 5 cases of chronic myelomonocytic leukemia (CMML) were recorded in the group of Chernobyl clean-up workers with the median time of 14.8 years from 1986-1987 to diagnosis. The association between radiation exposure and MDS is discussed. The suggested life-long risk for myelodysplastic syndromes among A-bomb survivors in Japan highlights the importance of the continuing follow-up studies in the affected populations in the post-Chernobyl period.

  9. Review on technical issues influencing the performance of chemical barriers of TRU waste repository

    International Nuclear Information System (INIS)

    Fujita, Tomonari; Sugiyama, Daisuke; Tsukamoto, Masaki; Yokoyama, Hayaichi

    1997-01-01

    Studies of technical issues influencing the performance assessment of TRU waste disposal which is occurred from the nuclear fuel reprocessing were reviewed in related to the development of safety analysis method. Especially, the chemical containment was investigated as a key barrier to radionuclide migration. TRU waste including long-lived radionuclides need long-term performance assessment which could be assumed only by the chemical barrier. The description of technical issues concerned with the performance of TRU waste repository has been divided into the following categories: long-term degradation of cementitious materials as engineered barrier for radionuclide migration, effect of colloids, organic macromolecules and organic degradation products on chemical behavior of radionuclides, gas generation by corrosion of metallic wastes, and effects of microbial activity. Preliminary performance assessment indicated that important factors affecting performance of chemical barriers in near-field were the distribution coefficient and the solubility of radionuclides in near-field groundwater. Therefore, it was identified that key issues associated with performance of chemical barrier were evaluation of (a) the long-term change of distribution coefficient of cementitious material through the degradation under repository condition and (b) chemical speciation change of radionuclides such as increase of solubility by the presence of colloidal-size materials. (author)

  10. Retroactive insurance may fund TMI-2 cleanup

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    A Pennsylvania task force recommended that nuclear utilities insure their plants with a mandatory national property insurance program. The proposed Nuclear Powerplant Property Damage Insurance Act of 1981 will cover the cleanup costs of onsite damage in excess of $350 million for a single accident ($50 million when private insurance is added on) and a ceiling of two billion dollars. Participation in the insurance pool would be in conjunction with licensing and would permit no grandfathering. Total payout for Three Mile Island-2 would cover 75% of the cleanup costs, the remainder to be apportioned among other parties. The insurance pool will have a $750 million goal supported by utility premiums

  11. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  12. Biomass gasification hot gas cleanup for power generation

    Energy Technology Data Exchange (ETDEWEB)

    Wiant, B.C.; Bachovchin, D.M. [Westinghouse Electric Corp., Orlando, FL (United States); Carty, R.H.; Onischak, M. [Institute of Gas Technology, Chicago, IL (United States); Horazak, D.A. [Gilbert/Commonwealth, Reading, PA (United States); Ruel, R.H. [The Pacific International Center for High Technology Research, Honolulu, HI (United States)

    1993-12-31

    In support of the US Department of Energy`s Biomass Power Program, a Westinghouse Electric led team consisting of the Institute of Gas Technology (IGT), Gilbert/Commonwealth (G/C), and the Pacific International Center for High Technology Research (PICHTR), is conducting a 30 month research and development program. The program will provide validation of hot gas cleanup technology with a pressurized fluidized bed, air-blown, biomass gasifier for operation of a gas turbine. This paper discusses the gasification and hot gas cleanup processes, scope of work and approach, and the program`s status.

  13. Denmark; Systemic Issues in Mortgage Loans and Covered Bond Finance: Technical Note

    OpenAIRE

    International Monetary Fund

    2014-01-01

    This technical note analyzes systemic issues in mortgage loans and covered bond finance in Denmark. Mortgage lending has seen significant product innovation in recent years. Loans with adjustable interest rates and/or interest-only periods, which have been introduced since the late 1990s, had grown to 75 percent and 53 percent, respectively, of total outstanding mortgage loans at the end of 2013. The major changes in the characteristics of the underlying mortgage loans have naturally been ref...

  14. Waste Cleanup: Status and Implications of Compliance Agreements Between DOE and Its Regulators

    International Nuclear Information System (INIS)

    Jones, G. L.; Swick, W. R.; Perry, T. C.; Kintner-Meyer, N.K.; Abraham, C. R.; Pollack, I. M.

    2003-01-01

    This paper discusses compliance agreements that affect the Department of Energy's (DOE) cleanup program. Compliance agreements are legally enforceable documents between DOE and its regulators, specifying cleanup activities and milestones that DOE has agreed to achieve. Over the years, these compliance agreements have been used to implement much of the cleanup activity at DOE sites, which is carried our primarily under two federal laws - the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA) and the Resource Conservation and Recovery Act of 0f 1976, as amended (RCRA). Our objectives were to determine the types of compliance agreements in effect at DOE cleanup sites, DOE's progress in achieving the milestones contained in the agreements, whether the agreements allowed DOE to prioritize work across sites according to relative risk, and possible implications the agreements have on DOE's efforts to improve the cleanup program

  15. Pursing other deep pockets: California's underground storage tank cleanup fund and insurance policies

    International Nuclear Information System (INIS)

    Almanza, P.R.

    1995-01-01

    When faced with a potentially very expensive environmental cleanup, most companies and individuals try to do the only sensible thing, which is to find out if anyone else will pay the bill. This presentation will outline two avenues that may provide a substantial financial contribution to environmental cleanups: (a) California's Underground Storage Tank Cleanup Fund and (b) insurance policies. The Underground Storage Tank Cleanup Fund was established in 1989 to help eligible owners and operators of petroleum underground storage tanks (USTs) to: (a) get reimbursed for costs of unauthorized releases of petroleum from USTs; (b) get reimbursed for damages awarded to third parties as a result of unauthorized releases of petroleum from USTs; and (c) meet federal and state requirements that the UST owner and/or operator be able to pay for cleanup costs and damages to third parties caused by unauthorized releases of petroleum

  16. Mental disorders among Chernobyl cleanup workers from Estonia: A clinical assessment.

    Science.gov (United States)

    Laidra, Kaia; Rahu, Kaja; Kalaus, Katri-Evelin; Tekkel, Mare; Leinsalu, Mall

    2017-08-01

    To assess, at a clinical level, the mental health of former Chernobyl cleanup workers from Estonia by comparing them with same-age controls. The Mini International Neuropsychiatric Interview (MINI) was administered during 2011-2012 to 99 cleanup workers and 100 population-based controls previously screened for mental health symptoms. Logistic regression analysis showed that cleanup workers had higher odds of current depressive disorder (odds ratio [OR] = 3.07, 95% confidence interval [CI: 1.34, 7.01]), alcohol dependence (OR = 3.47, 95% CI [1.29, 9.34]), and suicide ideation (OR = 3.44, 95% CI [1.28, 9.21]) than did controls. Except for suicide ideation, associations with Chernobyl exposure became statistically nonsignificant when adjusted for education and ethnicity. A quarter of a century after the Chernobyl accident, Estonian cleanup workers were still at increased risk of mental disorders, which was partly attributable to sociodemographic factors. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  17. Significance of radon exposures in developing cleanup criteria for radium-contaminated soil at the Weldon Spring Site

    International Nuclear Information System (INIS)

    Blunt, D.L.; Peterson, J.M.; Hillman, D.J.

    1993-10-01

    The Weldon Spring site, located in St. Charles County, Missouri, is included on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) is currently conducting cleanup activities at the site. This paper discusses the significance of radon exposures that may result from radium-contaminated soil and the approach currently being taken at the Weldon Spring site to address this issue

  18. Rocky Flats Cleanup Agreement implementation successes and challenges

    International Nuclear Information System (INIS)

    Shelton, D.C.

    1997-01-01

    On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations

  19. Comparison study for the CCME reference method for determination of PHC in soil by using internal and external standard methods and by using silica gel column cleanup and in-situ silica gel cleanup methods

    International Nuclear Information System (INIS)

    Wang, Z.; Fingas, M.; Sigouin, L.; Yang, C.; Hollebone, B.

    2003-01-01

    The assessment, cleanup, and remediation of hydrocarbon contaminated sites is covered in the Reference Method for Canada-Wide Standard for Petroleum Hydrocarbons-Tier 1 Method. It replaces several analytical methods used in the past by some laboratories and jurisdictions in Canada. The authors conducted two comparative evaluations to validate the Tier 1 Analytical Method. The first compared the Internal and External Standard Methods, and the second compared the Silica Gel Column Cleanup Method with the In-situ Silica Gel Cleanup Method. The Canadian Council of Ministers of the Environment (CCME) Tier 1 Method recommends and requires the External Standard Method to determine petroleum hydrocarbons (PHC) in soil samples. The Internal Method is widely used to quantify various organic and inorganic pollutants in environmental samples. The Tier 1 Method offers two options for the same extract cleanup. They are: Option A - In-situ Silica Gel Cleanup, and Option B - Silica Gel Column Cleanup. Linearity, precision, and PHC quantification results were the parameters considered for diesel and motor oil solutions, for diesel spiked soil samples, and for motor oil spiked soil samples. It was concluded that both the External and Internal Standard Methods for gas chromatograph (GC) determination of PHC in soil possess their own advantages. The PHC results obtained using the In-Situ Silica Gel Cleanup Method were lower than those obtained with the Silica Gel Column Cleanup Methods. The more efficient and effective sample cleanup method proved to be the Silica Gel Column Method. 13 refs., 7 tabs., 7 figs

  20. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1997-01-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL`s Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed.

  1. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1997-01-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL's Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed

  2. Power systems development facility. Quarterly technical progress report, July 1, 1994--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  3. Evolution of EPA/DOE technical cooperation in remediation of radiation/mixed waste contaminated sites

    International Nuclear Information System (INIS)

    Dyer, Robert S.; Garcia-Frias, Beverly; Wolbarst, Anthony B.; Coe, Larry J.

    1992-01-01

    The EPA Office of Radiation Programs (ORP) and the DOE Office of Environmental Restoration and Waste Management (EM) are cooperating in efforts related to restoration of radioactive and mixed waste sites. The impetus for these efforts derived from DOE's need to perform restoration activities according to CERCLA/RCRA requirements, and from ORP's role as a supplier of radiation expertise to federal agencies. These activities include: assessing remediation technology, developing radioanalytical protocols; matching cleanup technologies to soil characteristics; developing a process for the evaluation, selection, and appropriate use of groundwater models; reviewing incinerator practices; and addressing technical issues associated with the WIPP. Cooperative projects planned for the future include: evaluation of methodologies for streamlining the restoration process; assessment of the applicability of process knowledge for waste characterization; evaluation of recycling of radioactive metals; and expansion of selected environmental protection initiatives at the International Atomic Energy Agency (IAEA). Public acceptance is a crucial component of the remediation process. An underlying objective of these cooperative initiatives is to address issues of concern to the public in an open and honest fashion. (author)

  4. Evaluation of systems interactions in nuclear power plants: Technical findings related to Unresolved Safety Issue A-17

    International Nuclear Information System (INIS)

    Thatcher, D.

    1989-05-01

    This report presents a summary of the activities related to Unresolved Safety Issue (USI)A-17, ''Systems Interactions in Nuclear Power Plants,'' and also includes the NRC staff's conclusions based on those activities. The staff's technical findings provide the framework for the final resolution of this unresolved safety issue. The final resolution will be published later as NUREG-1229. 52 refs., 4 tabs

  5. Assessment, Cleanup and Redevelopment Exchange System (ACRES)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Assessment, Cleanup and Redevelopment Exchange System (ACRES) is an online database for Brownfields Grantees to electronically submit data directly to EPA.

  6. Approaching Technical Issues in Architectural Education

    DEFF Research Database (Denmark)

    Pugnale, Alberto; Parigi, Dario

    2012-01-01

    This paper discusses teaching of technical subjects in architecture, presenting two experimental activities, recently organized at Aalborg University - a two week long workshop and a one day long lecture. From the pedagogical point of view, the activities are strategically placed between conventi......This paper discusses teaching of technical subjects in architecture, presenting two experimental activities, recently organized at Aalborg University - a two week long workshop and a one day long lecture. From the pedagogical point of view, the activities are strategically placed between...

  7. Cleanup at the Los Alamos National Laboratory - The Challenges

    International Nuclear Information System (INIS)

    Stiger, S.G.; Hargis, K.; Graham, M.; Rael, G.

    2009-01-01

    This paper provides an overview of environmental cleanup at the Los Alamos National Laboratory (LANL) and some of the unique aspects and challenges. Cleanup of the 65-year old Department of Energy laboratory is being conducted under a RCRA Consent Order with the State of New Mexico. This agreement is one of the most recent cleanup agreements signed in the DOE complex and was based on lessons learned at other DOE sites. A number of attributes create unique challenges for LANL cleanup - the proximity to the community and pueblos, the site's topography and geology, and the nature of LANL's on-going missions. This overview paper will set the stage for other papers in this session, including papers that present: - Plans to retrieve buried waste at Material Disposal Area B, across the street from one of Los Alamos' commercial districts and the local newspaper; - Progress to date and joint plans with WIPP for disposal of the remaining inventory of legacy transuranic waste; - Reviews of both groundwater and surface water contamination and the factors complicating both characterization and remediation; - Optimizing the disposal of low-level radioactive waste from ongoing LANL missions; - A stakeholder environmental data transparency project (RACER), with full public access to all available information on contamination at LANL, and - A description of the approach to waste processing cost recovery from the programs that generate hazardous and radioactive waste at LANL. (authors)

  8. Cleanup Verification Package for the 118-F-2 Burial Ground

    International Nuclear Information System (INIS)

    Capron, J.M.; Anselm, K.A.

    2008-01-01

    This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-2 Burial Ground. This burial ground, formerly called Solid Waste Burial Ground No. 1, was the original solid waste disposal site for the 100-F Area. Eight trenches contained miscellaneous solid waste from the 105-F Reactor and one trench contained solid waste from the biology facilities

  9. Subsurface Contaminant Focus Area: Monitored Natural Attenuation (MNA)--Programmatic, Technical, and Regulatory Issues

    Energy Technology Data Exchange (ETDEWEB)

    Krupka, Kenneth M.; Martin, Wayne J.

    2001-07-23

    Natural attenuation processes are commonly used for remediation of contaminated sites. A variety of natural processes occur without human intervention at all sites to varying rates and degrees of effectiveness to attenuate (decrease) the mass, toxicity, mobility, volume, or concentration of organic and inorganic contaminants in soil, groundwater, and surface water systems. The objective of this review is to identify potential technical investments to be incorporated in the Subsurface Contaminant Focus Area Strategic Plan for monitored natural attenuation. When implemented, the technical investments will help evaluate and implement monitored natural attenuation as a remediation option at DOE sites. The outcome of this review is a set of conclusions and general recommendations regarding research needs, programmatic guidance, and stakeholder issues pertaining to monitored natural attenuation for the DOE complex.

  10. HANDBOOK ON THE BENEFITS, COSTS, AND IMPACTS OF LAND CLEANUP AND REUSE

    Science.gov (United States)

    Summarizes the theoretical and empirical literature addressing benefit-cost and impact assessment of the land cleanup and reuse scenario. When possible, recommendations are provided for conducting economic analysis of land cleanup and reuse sites and programs. The knowledge base ...

  11. Status of Pesticides and Degradation Products in Soil After Clean-up ...

    African Journals Online (AJOL)

    The status of pesticide residues in soil samples collected from a former storage site one year after clean-up of stockpiles and treatment with NaOH was investigated. The analytes were extracted from samples by pressurized fluid extraction using n-hexane:acetone (75:25) mixture. Clean-up of extracts was conducted by ...

  12. Mental health and alcohol problems among Estonian cleanup workers 24 years after the Chernobyl accident.

    Science.gov (United States)

    Laidra, Kaia; Rahu, Kaja; Tekkel, Mare; Aluoja, Anu; Leinsalu, Mall

    2015-11-01

    To study the long-term mental health consequences of the 1986 Chernobyl nuclear accident among cleanup workers from Estonia. In 2010, 614 Estonian Chernobyl cleanup workers and 706 geographically and age-matched population-based controls completed a mail survey that included self-rated health, the Posttraumatic Stress Disorder Checklist (PCL), alcohol symptoms (AUDIT), and scales measuring depressive, anxiety, agoraphobia, fatigue, insomnia, and somatization symptoms. Respondents were dichotomized into high (top quartile) and low symptom groups on each measure. Logistic regression analysis detected significant differences between cleanup workers and controls on all measures even after adjustment for ethnicity, education, marital status, and employment status. The strongest difference was found for somatization, with cleanup workers being three times more likely than controls to score in the top quartile (OR = 3.28, 95% CI 2.39-4.52), whereas for alcohol problems the difference was half as large (OR = 1.52, 95% CI 1.16-1.99). Among cleanup workers, arrival at Chernobyl in 1986 (vs. later) was associated with sleep problems, somatization, and symptoms of agoraphobia. The toll of cleanup work was evident 24 years after the Chernobyl accident among Estonian cleanup workers indicating the need for focused mental health interventions.

  13. Thyroid disorders in Chernobyl clean-up workers from Latvia

    International Nuclear Information System (INIS)

    Kurjane, N.; Orlikovs, G.; Ritenberga, R.; Skudra, M.; Lemane, R.; Lemanis, A.; Curbakova, E.; Groma, V.; Socnevs, A.

    1999-01-01

    The condition of thyroid was examined in 2188 Chernobyl clean-up workers residing in Latvia and a control group consisting of 1041 employees of the Ministry of International Affairs. Thyroid examinations included palpation, ultrasonography, selective scintigraphy and detection of the level of thyroid hormones in blood serum:L STH (thyroid-stimulating hormone), total T3 (triiodothyronine), and T4 (thyroxine). Thyroid was registered in 394 Chernobyl clean-up workers. Of these cases, 28 patients with suspected thyroid cancer were operated, and morphological examinations revealed papillary adenocarcinoma (in 5 patients), follicular adenocarcinoma (2), nodular colloid goiter (16); toxic diffuse goiter (1), papillary-follicular adenoma (3), and chronic thyroiditis (1). It was determined that the thyroid pathology in the Chernobyl clean-up workers had a tendency to progress (27 cases in 1987 versus 394 cases in 1998 in total; and absence of thyroid cancer in 1987, compared with 7 cases in 1998); thyroid nodules increased twice (64 cases in 1997, compare with 126 cases in 1998). (author)

  14. Evaluation of beach cleanup effects using linear system analysis.

    Science.gov (United States)

    Kataoka, Tomoya; Hinata, Hirofumi

    2015-02-15

    We established a method for evaluating beach cleanup effects (BCEs) based on a linear system analysis, and investigated factors determining BCEs. Here we focus on two BCEs: decreasing the total mass of toxic metals that could leach into a beach from marine plastics and preventing the fragmentation of marine plastics on the beach. Both BCEs depend strongly on the average residence time of marine plastics on the beach (τ(r)) and the period of temporal variability of the input flux of marine plastics (T). Cleanups on the beach where τ(r) is longer than T are more effective than those where τ(r) is shorter than T. In addition, both BCEs are the highest near the time when the remnants of plastics reach the local maximum (peak time). Therefore, it is crucial to understand the following three factors for effective cleanups: the average residence time, the plastic input period and the peak time. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. A review of occupational safety and health issues relevant to the Environmental Restoration Program: Selected case histories and associated issues

    International Nuclear Information System (INIS)

    Lesperance, A.M.; Siegel, M.R.; McKinney, M.C.

    1994-08-01

    Since the 1940s, US Department of Energy (DOE) sites have been used for nuclear materials processing and production, warhead testing, and weapons research and development. These activities have resulted in extensive environmental contamination. DOE has established a goal to cleanup and restore the groundwater, soils, sediments, and surface water at its facilities across the nation. To achieve this goal, many workers will be needed to conduct the cleanup. These workers will need training and will be required to follow occupational safety and health (OSH) regulations and guidelines. Compliance with the OSH regulations and guidelines will have an anomous influence on the schedule, money, and technology needed for environmental restoration. Therefore, one area that must be considered in the early stages of long-term planning is the impact of OSH issues on the environmental restoration process. The DOE Office of Environmental Restoration and Waste Management has requested that the Pacific Northwest Laboratory (PNL) investigate the impact of these issues on the environmental restoration process

  16. GPU seeks new funding for TMI cleanup

    International Nuclear Information System (INIS)

    Utroska, D.

    1982-01-01

    General Public Utilities (GPU) wants approval for annual transfer of money from base rate increases in other accounts to pay for the cleanup at Three Mile Island (TMI) until TMI-1 returns to service or the public utility commission takes further action. This proposal confirms fears of a delay in TMI-1 startup and demonstrates that the January negotiated settlement will produce little funding for TMI-2 cleanup. A review of the settlement terms outlines the three-step process for base rate increases and revenue adjustments after the startup of TMI-1, and points out where controversy and delays due to psychological stress make a new source of money essential. GPU thinks customer funding will motivate other parties to a broad-based cost-sharing agreement

  17. Website design: technical, social and medical issues for self-reporting by elderly patients.

    Science.gov (United States)

    Taylor, Mark J; Stables, Rod; Matata, Bashir; Lisboa, Paulo J G; Laws, Andy; Almond, Peter

    2014-06-01

    There is growing interest in the use of the Internet for interacting with patients, both in terms of healthcare information provision and information gathering. In this article, we examine the issues in designing healthcare websites for elderly users. In particular, this article uses a year-long case study of the development of a web-based system for self-reporting of symptoms and quality of life with a view to examine the issues relating to website design for elderly users. The issues identified included the technical, social and medical aspects of website design for elderly users. The web-based system developed was based on the European Quality of Life 5-Dimensions health-status questionnaire, a commonly used tool for patient self-reporting of quality of life, and the more specific coronary revascularisation outcome questionnaire. Currently, self-reporting is generally administered in the form of paper-based questionnaires to be completed in the outpatient clinic or at home. There are a variety of issues relating to elderly users, which imply that websites for elderly patients may involve different design considerations to other types of websites.

  18. Retrospective Dosimetry and Clinical Follow-up Programme of Chernobyl Accident Clean-up Workers in Latvia

    International Nuclear Information System (INIS)

    Mironova-Ulmane, N.; Pavlenko, A.; Zvagule, T.; Karner, T.; Bruvere, R.; Volrate, A.

    2001-01-01

    Full text: About 6500 Latvian inhabitants were recruited for clean-up works at Chernobyl Nuclear Power Plant during 1986-1991. Absorbed doses for them are usually unknown, because only less then half of the clean-up workers cohort had officially documented external exposure. Clinical investigations show high morbidity rate of clean-up workers compared with general population. The results of Electronic Spin Resonance (ESR) dose reconstruction (doses absorbed in the tooth enamel) for the clean-up workers were always higher as documented of exposure doses of physical measurements. In many cases more than half of total absorbed dose is due to 90 Sr accumulated in teeth. Most of the clean-up workers have poli-symptomatic sicknesses that exhibit tendency to progress, and their morbidity exceeds that observed in general population. ESR dosimetry programs and clinical follow-up improved existing knowledge in the field of radiation medicine. These data will help to develop and apply the proper treatment and rehabilitation procedures for clean-up workers. (author)

  19. The Estonian study of Chernobyl cleanup workers. I. Introduction

    International Nuclear Information System (INIS)

    Rahu, Mati

    1999-01-01

    The most comprehensive epidemiological project ever performed in Estonia - The Estonian Study of Chernobyl Cleanup Workers - was the joint effort of researchers from Estonia, Finland and USA. Until September 1999, the results of this study were published in English only. To familiarize the readership of 'Eesti Arst' with the major study findings, the abridged versions of four original papers from 'Radiation Research' are presented in the current issue of the journal. For the Estonian epidemiologists, the work under this project that consists of eight sub projects was a real challenge. In the course of the study, skills were developed in writing a study protocol, preparing a questionnaire, progress reporting, documenting the structure of databases, record linkage, and problem solving. It was an exciting experience to work with top scientists like William Bigbee, John Boice, Timo Hakulinen, Ronald Jensen and Gayle Littlefield. (author)

  20. Comparative study on cleanup procedures for the determination of organophosphorus pesticides in vegetables

    International Nuclear Information System (INIS)

    Alvin, Chai Lian Kuet; Lau, Seng

    2008-01-01

    A study was carried out to compare the cleanup procedures for the determination of organophosphorus pesticides in vegetables. Eleven organophosphorus pesticides were extracted with acetone and methylene chloride. Extracts were cleanup by solid-phase extraction (SPE) mixed-mode column using quaternary amine and aminopropyl (SAX/ NH 2 ) or octadecyl (C 18 ) sorbents. The pesticides were determined by gas chromatography with flame photometric detector. The recovery results obtained from the SPE SAX/ NH 2 and C 18 cleanups in carrot, cucumber and green mustard samples were in the range of 71.0 % to 115 %. Lower recoveries were obtained for polar pesticides, methamidophos and dimethoate. These results were compared to the method currently used in the laboratory which does not include any cleanup. (author)

  1. Increased leukemia risk in Chernobyl cleanup workers

    Science.gov (United States)

    A new study found a significantly elevated risk for chronic lymphocytic leukemia among workers who were engaged in recovery and clean-up activities following the Chernobyl power plant accident in 1986.

  2. Radiation Dose to Post-Chernobyl Cleanup Workers

    Science.gov (United States)

    Radiation dose calculation for post-Chernobyl Cleanup Workers in Ukraine - both external radiation exposure due to fallout and internal doses due to inhalation (I131 intake) or ingestion of contaminated foodstuffs.

  3. Literature Survey on Technical Issues and Insights of Multi-Unit PSA

    International Nuclear Information System (INIS)

    Baek, Sejin; Park, Soyoung; Heo, Gyunyoung

    2016-01-01

    The need consider the risk impact in case of multi-unit in a single site increased after the accident at Fukushima Daiichi in March 2011. This means that we have to consider the single-unit initiators impacting the other units and the simultaneous accidents of the multi-unit on the same site. Particularly, this kind of technical concern is serious in case of the Republic of Korea where multi-units had to be located in high-density population area due to geographical features. The Nuclear Safety and Security Commission (NSSC) in the Republic of Korea has been trying to identify the state of the art of international and domestic regulations and techniques on multi-unit risk assessment and planning the road map for the safety researches. However, we have to say that finding a common accepted methodology along with safety criteria for multi-unit PSA was not an easy task up to now. This paper summarizes and analyzes related international and domestic journals' papers, conferences' papers and reports about the multi-unit PSA classifying categories with themes to understand the technical tendency of multi-unit PSA. In addition, some insights that were obtained from this classification have been arranged too. This paper investigated the technical trend of the multi-unit PSA as collecting of the international and domestic journals' papers, conferences papers and reports, and analyzing them. Upon the literature survey, a few statistics, technical issues, and insights were summarized. Both of the fundamental and practical researches need to find a globally accepted methodology to calculate and determine quantitative objectives for a multi-unit PSA. We want to expect that this paper can be shared to understand the current status of multi-unit PSA

  4. Literature Survey on Technical Issues and Insights of Multi-Unit PSA

    Energy Technology Data Exchange (ETDEWEB)

    Baek, Sejin; Park, Soyoung; Heo, Gyunyoung [Kyung Hee Univ., Yongin (Korea, Republic of)

    2016-10-15

    The need consider the risk impact in case of multi-unit in a single site increased after the accident at Fukushima Daiichi in March 2011. This means that we have to consider the single-unit initiators impacting the other units and the simultaneous accidents of the multi-unit on the same site. Particularly, this kind of technical concern is serious in case of the Republic of Korea where multi-units had to be located in high-density population area due to geographical features. The Nuclear Safety and Security Commission (NSSC) in the Republic of Korea has been trying to identify the state of the art of international and domestic regulations and techniques on multi-unit risk assessment and planning the road map for the safety researches. However, we have to say that finding a common accepted methodology along with safety criteria for multi-unit PSA was not an easy task up to now. This paper summarizes and analyzes related international and domestic journals' papers, conferences' papers and reports about the multi-unit PSA classifying categories with themes to understand the technical tendency of multi-unit PSA. In addition, some insights that were obtained from this classification have been arranged too. This paper investigated the technical trend of the multi-unit PSA as collecting of the international and domestic journals' papers, conferences papers and reports, and analyzing them. Upon the literature survey, a few statistics, technical issues, and insights were summarized. Both of the fundamental and practical researches need to find a globally accepted methodology to calculate and determine quantitative objectives for a multi-unit PSA. We want to expect that this paper can be shared to understand the current status of multi-unit PSA.

  5. Application of EnviroTRADE information system for the cleanup of the former Soviet Union (FSU) site at Komarom Base, Hungary

    International Nuclear Information System (INIS)

    Matalucci, R.V.; Harrington, M.W.; Harlan, C.P.; Kuperberg, J.M.; Biczo, I.L.

    1994-01-01

    During a NATO Advanced Research Workshop (ARW) held in Visegrad, Hungary, June 21-23, 1994, portions of contamination data from the Former Soviet Union (FSU) site at Komarom, Hungary were used to demonstrate the international EnviroTRADE Information System as a tool to assist with the identification of alternative cleanup measures for contaminated sites. The NATO ARW was organized and conducted by the joint Florida State University and the Technical University of Budapest, Center for Hungarian-American Environmental Research, Studies, and Exchanges (CHAERSE). The purpose of the workshop was to develop a strategy for the identification and selection of appropriate low-cost and innovative site remediation technologies and approaches for a typical abandoned FSU site. The EnviroTRADE information system is a graphical, photographical, and textual environmental management tool under development by the U.S. Department of Energy (USDOE) at Sandia National Laboratories (SNL) as a part of the cleanup program of the nuclear weapons complex. EnviroTRADE provides a single, powerful, multi-purpose, multi-user, multi-media, and interactive computer information system for worldwide environmental restoration and waste management (ER/WM). Graphical, photographic, and textual data from the Komarom FSU site were entered into EnviroTRADE. These data were used to make comparative evaluations of site characterization and remediation technologies that might be used to clean up primarily hydrocarbon contamination in the groundwater and soil. Available Hydrogeological and geological features, contaminated soil profiles, and topographical maps were included in the information profiles. Although EnviroTRADE is currently only partially populated (approximately 350 technologies for cleanup are included in the database), the utility of the information system to evaluate possible options for cleanup of the Komarom site has been demonstrated

  6. Cleanup Verification Package for the 118-F-5 PNL Sawdust Pit

    International Nuclear Information System (INIS)

    Habel, L.D.

    2008-01-01

    This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-5 Burial Ground, the PNL (Pacific Northwest Laboratory) Sawdust Pit. The 118-F-5 Burial Ground was an unlined trench that received radioactive sawdust from the floors of animal pens in the 100-F Experimental Animal Farm

  7. UTILIZING INNOVATIVE TECHNOLOGIES FOR ENVIRONMENTAL CLEAN-UP AT SAVANNAH RIVER SITE

    International Nuclear Information System (INIS)

    Bergren, C.

    2009-01-01

    The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units and facilities that are required by environmental regulations, to undergo characterization and, if needed, remediation. In the initial years of the SRS environmental cleanup program (early 1990s), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical/pH-adjusting injection, phytoremediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baroballs, electrical resistance heating, soil vapor extraction, and microblowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works proactively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup

  8. Perceptions of on-site hunters: Environmental concerns, future land use, and cleanup options at the Savannah River Site

    International Nuclear Information System (INIS)

    Burger, J.; Sanchez, J.

    1999-01-01

    The Department of Energy owns land in 34 states, and most of these lands have been off limits to the public for over 50 years. Although some parts of each site are contaminated, most of many sites are not. With the ending of the Cold War, the department is considering alternative land uses. In this article, the perceptions of hunters and fishermen allowed on site for a limited time were examined, about environmental concerns, future land use, and cleanup options. Although loss of jobs was the foremost concern, preserving parts of the site had more support as a future land use than continuing the nuclear mission, and nearly three-quarters of the sample supported cleanup, regardless of cost. On-site employment was a significant indicator of lower concern about safety and environmental issues, less support for designating the site for research, and more concern for maintaining jobs

  9. Three Mile Island Cleanup: experiences, waste disposal, and environmental impact

    International Nuclear Information System (INIS)

    King, L.J.; Opelka, J.H.

    1982-01-01

    These papers were presented in a two-session symposium during the American Institute of Chemical Engineers 1981 Summer National meeting in Detroit, Michigan, August 16-19, 1981. The cleanup activities described included the venting of the gases, mostly krypton-85, from the reactor containment building and several entries of personnel into the containment building to determine the physical conditions and the levels of radiation and radioactive contamination. Results of the latest process development tests of the flowsheet for the submerged Demineralizer Water Treatment System for decontaminating the water in the containment building were presented. The status of existing knowledge of radiation effects on ion exchange materials used in radioactive waste management were reviewed. A program to demonstrate incorporation of the loaded zeolite into a glass as a final waste form was also described. The generation, classification, treatment, and disposal of solid waste forms resulting from the cleanup were discussed with special consideration of the ion exchange media used for cleanup of liquids with relatively high radionuclide concentrations. The radiological, socioeconomic, and psychological impacts of the cleanup were evaluated. This work formed the basis for the recent issuance by the NRC of a programmatic environmental impact statement relative to decontamination and disposal of the radioactive wastes resulting from the accidents

  10. Resolution of digital instrumentation and control and human factors technical and regulatory issues for new plants and for modernization of operating plants

    International Nuclear Information System (INIS)

    Naser, J.A.; Torok, R.C.; Canavan, K.T.

    2008-01-01

    There are several technical and regulatory issues in the areas of digital I and C, human factors, and control rooms needing generic resolution. If they are not generically resolved, they can contribute to protracted regulatory reviews for operating plant license amendments and substantial delays and increased costs for new plant COL approvals. Therefore; a coordinated, proactive program has been established to resolve key issues. Both Industry and NRC have roles in resolving these key issues and addressing them in future design efforts and regulatory reviews. The Industry initiative is led by the NEI Digital I and C and Human Factors Working Group. NRC has established Task Working Groups under the NRC Digital I and C Steering Committee to address the issues and interact with Industry. EPRI is providing technical input and resolution leadership for some of the issues being addressed in three of the task working groups. For the Highly Integrated Control Room - Human Factors Task area, EPRI has taken the lead in developing draft industry position technical reports for the following three issues: 1) Minimum inventory of human system interfaces, 2) Computerized procedures and associated topics of automation and soft controls, and 3) Methodology to determine the acceptability of manual operator actions response times for a BTP 7-19 software common cause failure. For the Diversity and Defense-in-Depth area, EPRI has taken the lead in developing two draft industry position technical papers on the following topics: 1) Integrating defensive measures and diversity attributes to protect against digital common cause failures and 2) Susceptibility of digital devices and components to common cause failures. For the Risk Informing area, EPRI has taken the lead in developing two draft industry position technical papers on the following topics: 1) Clarifying how to use current methods to model digital systems in a PRA and 2) Application of PRA to specific digital I and C issues

  11. Cleanup at Los Alamos National Laboratory - the challenges - 9493

    Energy Technology Data Exchange (ETDEWEB)

    Stiger, Susan G [Los Alamos National Laboratory; Hargis, Kenneth M [Los Alamos National Laboratory; Graham, Michael J [Los Alamos National Laboratory; Rael, George J [NNSL/LASO

    2008-01-01

    This paper provides an overview of environmental cleanup at the Los Alamos National Laboratory (LANL) and some of the unique aspects and challenges. Cleanup of the 65-year old Department of Energy Laboratory is being conducted under a RCRA Consent Order with the State of New Mexico. This agreement is one of the most recent cleanup agreements signed in the DOE complex and was based on lessons learned at other DOE sites. A number of attributes create unique challenges for LANL cleanup -- the proximity to the community and pueblos, the site's topography and geology, and the nature of LANL's on-going missions. This overview paper will set the stage for other papers in this session, including papers that present: Plans to retrieve buried waste at Material Disposal Area B, across the street from oen of Los Alamos' commercial districts and the local newspaper; Progress to date and joint plans with WIPP for disposal of the remaining inventory of legacy transuranic waste; Reviews of both groundwater and surface water contamination and the factors complicating both characterization and remediation; Optimizing the disposal of low-level radioactive waste from ongoing LANL missions; A stakeholder environmental data transparency project (RACER), with full public access to all available information on contamination at LANL, and A description of the approach to waste processing cost recovery from the programs that generate hazardous and radioactive waste at LANL.

  12. Geologic disposal of radioactive waste: Ethical and technical issues

    International Nuclear Information System (INIS)

    Pigford, T.H.

    1999-01-01

    Ethical goals that future people should be protected and should not have to protect themselves from our radioactive waste are claimed by geologic repository projects. The best test of sufficient protection is to show that the calculated individual doses to future farming families are well below a regulatory limit. That limit should be no greater than what is now adopted to protect the public from operating licensed facilities. Present US calculations show doses, at times well beyond 10,000 years, that exceed current accepted limits by at least three orders of magnitude. Notwithstanding, there is a good chance that the goals can still be achieved by careful technical design of the geologic confinement system. But many in the US now propose ways that would allow greater individual exposures from radionuclides that eventually leak from a geologic repository. Examples include: (a) the 10,000-year cutoff proposed by industry, the US Congress, EPA, and DOE, thus obscuring the later times when higher doses are certain to result; (b) the vicinity-average dose proposed by industry and the US Congress; (c) the probabilistic critical groups proposed by EPRI and by the National Research Council's TYMS committee; (d) proposals to rely on future humans to detect and cleanup excessive amounts of radioactivity that may escape from a repository, and (e) the move to base compliance on calculated doses from well water drawn at considerable distance from Yucca Mountain. Each of these proposals would lead to a far more lenient radiation protection standard than current standards. Each of these proposals is without sufficient scientific basis for its use as a protector of public health. Each of these proposals would violate one or more of the ethical goals. Each is made without adequate discussion and explanation and without explaining how and why it would violate one or more of the ethical goals. What if serious work on alternatives fails to produce conservatively calculated and

  13. Immune state of patients of vegeto-vascular dystonia, clean-up workers of the Chernobyl accident

    International Nuclear Information System (INIS)

    Sakhno, T.A.; Davydova, T.I.; Bazika, D.A.; Chumak, A.A.

    1995-01-01

    Immune state of 272 clean-up workers, participants of the Chernobyl Power Plant accident, suffering from vegeto-vascular dystonia is studied. Comparison groups were formed by 20 healthy clean-up workers, 25 vegeto-vascular dystonia patients non-participating in the clean-up works, and 60 healthy donors. Immune state disturbances in the vegeto-vascular dystonia patients have unidirectional changing but among the clear-up workers their expression was much significant coinciding with the more severe clinical courses of disease comparing to the patients non-participating in the clean-up works

  14. The Use of the Hanford Onsite Packaging and Transportation Safety Program to Meet Cleanup Milestones Under the Hanford Site Cleanup 2015 Vision and the American Recovery and Reinvestment Act of 2009 - 12403

    Energy Technology Data Exchange (ETDEWEB)

    Lavender, John C. [CH2M HILL Plateau Remediation Company, Richland, WA 99354 (United States); Edwards, W. Scott [Areva Federal Services, Richland, WA 99354 (United States); Macbeth, Paul J.; Self, Richard J. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); West, Lori D. [Materials and Energy Corporation, Richland, WA 99354 (United States)

    2012-07-01

    The Hanford Site presents unique challenges in meeting the U.S. Department of Energy Richland Operations Office (DOE-RL) 2015 Cleanup Vision. CH2M Hill Plateau Remediation Company (CHPRC), its subcontractors, and DOE-RL were challenged to retrieve, transport and remediate a wide range of waste materials. Through a collaborative effort by all Hanford Onsite Central Plateau Cleanup Team Members, disposition pathways for diverse and seemingly impossible to ship wastes were developed under a DOE Order 460.1C-compliant Hanford Onsite Transportation Safety Program. The team determined an effective method for transporting oversized compliant waste payloads to processing and disposition facilities. The use of the onsite TSD packaging authorizations proved to be vital to safely transporting these materials for processing and eventual final disposition. The American Recovery and Reinvestment Act of 2009 (ARRA) provided additional resources to expedite planning and execution of these important cleanup milestones. Through the innovative and creative use of the TSD, the Hanford Onsite Central Plateau Cleanup Team Members have developed and are executing an integrated project plan that enables the safe and compliant transport of a wide variety of difficult-to-transport waste items, accelerating previous cleanup schedules to meet cleanup milestones. (authors)

  15. Efforts to earn public support and confidence in Hanford site cleanup work

    International Nuclear Information System (INIS)

    Brown, M.C.; Edwards, C.; Beers, A.A.

    1991-01-01

    Public involvement is needed for Hanford Site cleanup to succeed. If people do not know about, understand, and support cleanup, it will be more difficult and expensive. The Tri-Party Agreement (1) calls for public involvement in decisions about cleanup options and schedules. This paper defines what public involvement means and how the Washington State Department of Ecology (Ecology), US Environmental Protection Agency (EPA), and US Department of Energy (DOE) have conducted it. Experience and survey research have shown ways to improve our performance. While we have improved our conduct of public meetings, we must identify other ways to involve the public. Efforts continue to open decision making earlier in the decision process, to share information that is clear and understandable, and to open the channels of communication. We have made good progress. We have many opportunities to continue to improve. This paper describes some of the highlights and lessons learned in public involvement in Hanford Site cleanup

  16. Effort to earn public support and confidence in Hanford Site cleanup work

    International Nuclear Information System (INIS)

    Brown, M.C.; Edwards, C.; Beers, A.A.

    1991-09-01

    Public involvement is needed for Hanford Site cleanup to succeed. If people do not know about, understand, and support cleanup, it will be more difficult and expensive. The Tri-Party Agreement calls for public involvement in decisions about cleanup options and schedules. This paper defines what public involvement means and how the Washington State Department of Ecology (Ecology), US Environmental Protection Agency (EPA), and US Department of Energy (DOE) have conducted it. Experience and survey research have shown ways to improve our performance. While we have improved our conduct of public meetings, we must identify other ways to involve the public. Efforts continue to open decision making earlier in the decision process, to share information that is clear and understandable, and to open the channels of communication. We have made good progress. We have many opportunities to continue to improve. This paper describes some of the highlights and lessons learned in public involvement in Hanford Site cleanup. 4 refs

  17. Chromosome aberrations and rogue cells in lymphocytes of Chernobyl clean-up workers

    International Nuclear Information System (INIS)

    Lazutka, J.R.

    1996-01-01

    A cytogenetic analysis was performed on peripheral blood lymphocytes from 183 Chernobyl clean-up workers and 27 control individuals. Increased frequencies of chromosome aberrations were associated with exposure to radiation at Chernobyl, alcohol abuse and a history of recent influenza infection. However, only approximately 20% of Chernobyl clean-up workers had an increased frequency of dicentric and ring chromosomes. At the same time, an increased frequency of acentric fragments in lymphocytes of clean-up workers was characteristic. The use of multivitamins as dietary supplement significantly decreased the frequency of chromosome aberrations, especially of chromatid breaks. Rogue cells were found in lymphocytes of 28 clean-up workers and 3 control individuals. The appearance of rogue cells was associated with a recent history of acute respiratory disease (presumably caused by adenoviral infection) and, probably, alcohol abuse. Dicentric chromosomes in rogue cells were distributed according to a negative binomial distribution. Occurrence of rogue cells due to a perturbation of cell cycle control and abnormal apoptosis is suggested

  18. Answers to frequently asked questions about cleanup activities at Three Mile Island, Unit 2

    International Nuclear Information System (INIS)

    1984-03-01

    This question-and-answer report provides answers in nontechnical language to frequently asked questions about the status of cleanup activities at Three Mile Island, Unit 2. The answers update information first prepared in 1981, shortly after the cleanup got under way. Since then, a variety of important developments in the cleanup has occurred. The information in the report should be read in conjunction with NUREG 1060, a discussion of increased occupational exposure estimates for the cleanup. The questions and answers in this report cover purpose and community involvement, decontamination of water and reactor, fuel removal, radwaste transport, environmental impact, social and economic effects, worker exposures and safety, radiation monitoring, potential for accidents, and schedule and funding

  19. 77 FR 9847 - Safety Zone; Kinnickinnic River Containment and Cleanup; Milwaukee, WI

    Science.gov (United States)

    2012-02-21

    ... Kinnickinnic River due to the petroleum cleanup efforts. This temporary safety zone is necessary to protect the...-AA00 Safety Zone; Kinnickinnic River Containment and Cleanup; Milwaukee, WI AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary safety zone on the...

  20. Phenotypical characteristics of leukocyte membranes in Chernobyl clean-up workers from Latvia: use of the fluorescent probe ABM

    International Nuclear Information System (INIS)

    Kalnina, I.; Meirovics, I.; Garbuseva, N.; Bruvere, R.; Heisele, O.; Zvagule, T.; Volrate, A.; Feldmane, G.

    2001-01-01

    A fluorescent probe - aminoderivative of benzanthrone, AMB (developed at the Riga Technical University, Riga, Latvia) - has been previously shown to localise within the phospholipid bilayer of the cell membrane, and shown to affect the structural and functional properties of peripheral blood mononuclear cells (PBMC). The probe ABM was used to characterise the PBMC membranes of 97 Chernobyl clean-up workers from Latvia. The study was conducted in the years 1997-1998. After addition of the probe to PBMC, fluorescence intensity of ABM (F) was measured, the depolarisation value P was calculated, and emission spectra were recorded. Screening of all individuals showed 5 different patterns of fluorescence spectra. Four of the patterns had never been previously observed in healthy individuals or patients with tuberculosis, multiple sclerosis, oncologic patients, etc., examined by us. The spectral patterns of ABM suspensions were associated with ability of leukocytes to produce interferons, with the levels of immunoglobulins A, G, and M, the concentration of lead in peripheral blood, and with several neurologic diseases. The use of ABM allowed to show phenotypic differences in PBMC between Chernobyl clean-up workers and individuals who had never had professional contact with radioactivity. (author)

  1. Spreading, retention and clean-up of oil spills. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Jr, M P

    1976-05-01

    This study reviews and assesses the technology of oil spill spreading, retention and cleanup and proposes research needs in these areas. Sources of oil spills are analyzed and the difficulty of gathering meaningful statistics is discussed. Barrier technology is reviewed and problem areas analyzed. Natural and forced biodegradation and natural and chemical dispersion of oil spills are considered. Research recommendations are categorized under the following two headings (1) Preventive techniques and (2) Containment, Cleanup and Dispersion.

  2. Epidemiology of Late Health Effects in Ukrainian Chornobyl Cleanup Workers.

    Science.gov (United States)

    Bazyka, Dimitry; Prysyazhnyuk, Anatoly; Gudzenko, Natalya; Dyagil, Iryna; Belyi, David; Chumak, Vadim; Buzunov, Volodymyr

    2018-07-01

    This article summarizes the results of 30 y of follow-up of cancer and noncancer effects in Ukrainian cleanup workers after the Chornobyl accident. The number of power plant employees and first responders with acute radiation syndrome under follow-up by the National Research Center for Radiation Medicine decreased from 179 in 1986-1991 to 105 in 2011-2015. Cancers and leukemia (19) and cardiovascular diseases (21) were the main causes of deaths among acute radiation syndrome survivors (54) during the postaccident period. Increased radiation risks of leukemia in the Ukrainian cohort of 110,645 cleanup workers exposed to low doses are comparable to those among survivors of the atomic bomb explosions in Japan in 1945. Additionally, an excess of chronic lymphocytic leukemia was demonstrated in the cleanup workers cohort for 26 y after the exposure. A significant excess of multiple myeloma incidence [standardized incidence rate (SIR) 1.61 %, 95% confidence interval (CI) 1.01-2.21], thyroid cancer (SIR 4.18, 95% CI 3.76-4.59), female breast cancer (SIR 1.57 CI 1.40-1.73), and all cancers combined (SIR 1.07; 95% CI 1.05-1.09) was registered. High prevalence was demonstrated for cardio- and cerebrovascular diseases and mental health changes. However, the reasons for the increases require further investigation. To monitor other possible late effects of radiation exposure in Chornobyl cleanup workers, analytical cohort and case-control studies need to include cardiovascular pathology, specifically types of potentially radiogenic cancers using a molecular epidemiology approach. Possible effects for further study include increased rates of thyroid, breast, and lung cancers and multiple myeloma; reduction of radiation risks of leukemia to population levels; and increased morbidity and mortality of cleanup workers from cardio- and cerebrovascular pathology.

  3. Nuclear cleanup and decontamination for dismantling operations

    International Nuclear Information System (INIS)

    Bargues, S.; Solignac, Y.; Lapierre, Y.

    2003-01-01

    In the May 2003 issue of the review 'Controle', the French Nuclear Safety Authority (Autorite de Surete Nucleaire or ASN) reviewed the radiation protection and waste management principles applicable to dismantling operations carried out on nuclear installations, i.e. reactors, research laboratories, fuel cycle installations and nuclear power reactors. Estelle Chapelain, of the DGSNR (French General Directorate for Nuclear Safety and Radiation Protection), pointed out that dismantling work does not involve the same radioactive risks as operating an installation. For instance, 'the risk of disseminating radioactive material is generally greater because the dismantling process supposes the removal of one or more containment barriers'. In addition to this risk of internal exposure, the possibility of external irradiation of personnel must be taken into account due to the nature of the work carried out by the operators. The probability of conventional hazards is also accentuated, these hazards varying as work progresses (fire hazards during cutting operations, hazards associated with handling tasks, etc). Other risks must also be considered: hazards due to the ageing of installations, to loss of traceability, and finally the risks associated with waste management. Waste management falls within a strict regulatory framework specified by the decree dated December 31, 1999, which makes it compulsory to carry out a 'waste survey' with the aim of producing an inventory of waste and improving waste management. These surveys include 'waste zoning' to identify those areas liable to have been contaminated. These requirements lead operators to adapt their cleanup methodology in order to distinguish suspect rooms or equipment from those that can be deemed with certainty to be conventional. In its conclusion, the safety authority recalls the importance of 'the safety and radiation protection of dismantling operations being effectively managed and optimised, without imposing

  4. TECHNICAL APPROACHES TO CHARACTERIZING AND CLEANUP OF AUTOMOTIVE RECYCLING BROWNFIELDS

    Science.gov (United States)

    The guidance document gives assistance to communities, decision-makers, states and municipalities, academia, and the private sector to address issues related to the redevelopment of Brownfields sites, specifically automotive recycling sites. The document helps users to understand...

  5. Cleanup at the Los Alamos National Laboratory - the challenges - 9493

    International Nuclear Information System (INIS)

    Stiger, Susan G.; Hargis, Kenneth M.; Graham, Michael J.; Rael, George J.

    2008-01-01

    This paper provides an overview of environmental cleanup at the Los Alamos National Laboratory (LANL) and some of the unique aspects and challenges. Cleanup of the 65-year old Department of Energy Laboratory is being conducted under a RCRA Consent Order with the State of New Mexico. This agreement is one of the most recent cleanup agreements signed in the DOE complex and was based on lessons learned at other DOE sites. A number of attributes create unique challenges for LANL cleanup -- the proximity to the community and pueblos, the site's topography and geology, and the nature of LANL's on-going missions. This overview paper will set the stage for other papers in this session, including papers that present: Plans to retrieve buried waste at Material Disposal Area B, across the street from oen of Los Alamos' commercial districts and the local newspaper; Progress to date and joint plans with WIPP for disposal of the remaining inventory of legacy transuranic waste; Reviews of both groundwater and surface water contamination and the factors complicating both characterization and remediation; Optimizing the disposal of low-level radioactive waste from ongoing LANL missions; A stakeholder environmental data transparency project (RACER), with full public access to all available information on contamination at LANL, and A description of the approach to waste processing cost recovery from the programs that generate hazardous and radioactive waste at LANL.

  6. Radioactive Waste and Clean-up Division

    International Nuclear Information System (INIS)

    Collard, G.

    2001-01-01

    The main objectives of the Radioactive Waste and Clean-up division of SCK-CEN are outlined. The division's programme consists of research, development and demonstration projects and aims to contribute to the objectives of Agenda 21 on sustainable development in the field of radioactive waste and rehabilitation of radioactively contaminated sites

  7. Thyroid Nodularity and cancer in Chernobyl clean-up workers from Latvia

    International Nuclear Information System (INIS)

    Kurjane, N.; Farbtuha, T.; Matisane, L.

    2004-01-01

    The Chernobyl nuclear reactor accident on April 26, 1986, resulted in massive radioactive contamination of the surrounding area. Radiation exposure was from rapidly decaying radioactive iodines, as well as from 137 CS and other long-lived radioisotopes. About 6000 clean-up workers of the Chernobyl Power Plant accident were from Latvia. External radiation exposure was defined for 40% of them and the doses were 0.01-0.5 Grey (Gy). Although according to conclusions of authoritative experts of different countries, the actual doses of radiation might be at least 3-4 times higher. Because the thyroid is highly susceptible to cancer induction by ionizing radiation, our examination was conducted in 2001 to determine the prevalence of thyroid tumors in 1990-2000 and other nodular thyroid disease 14 years after the accident in Latvia's Chernobyl clean-up workers. The Latvian State Register for persons who have received ionising radiation in Chernobyl and Latvia's Cancer Register were used in this work as well as 1000 Chernobyl accident clean-up workers medical ambulatory cards were analysed. We have received that occurrence of thyroid cancer in Chernobyl clean-up workers was 10,6 times higher than in Latvia's population (men) in 1990-2000 and also it occurs at earlier age in comparison with population data (40-50 and 55-65 accordingly). This can be explained in two ways: either due to effect of the short-term or long-term external and internal radiation exposure (including, from the incorporated 131 I) on the thyroid tissue, or due to a better dispensarisation (obligatory thyroid ultrasound examination once per year) of the examined group. The first thyroid cancer was discovered in 1996 -after ten years of latent period. The relative risk of thyroid cancer in Chernobyl clean-up workers in 1996 was 33.27, and in 1997 -42.64. Then, the morbidity of the thyroid cancer exhibits tendency to decrease (RR 18.27 in 1998, and 9.42 in 1999). The presence of thyroid benign nodules was

  8. Solvent degradation and cleanup: a survey and recent ORNL studies

    International Nuclear Information System (INIS)

    Mailen, J.C.; Tallent, O.K.

    1984-01-01

    This paper surveys the mechanisms for degradation of the tributyl phosphate and diluent components of Purex solvent by acid and radiation, reviews the problems encountered in plant operations resulting from the presence of these degradation products, and discusses methods for minimizing the formation of degradation products and accomplishing their removal. Scrubbing solutions containing sodium carbonate or hydroxylamine salts and secondary cleanup of solvents using solid sorbents are evaluated. Finally, recommendations for improved solvent cleanup are presented. 50 references, 4 figures, 3 tables

  9. Where is New York State relative to cleanup standards for soils contaminated with radioactive materials

    International Nuclear Information System (INIS)

    Merges, P.J.

    1995-01-01

    In September 1993, New York State adopted a cleanup guideline for radioactively contaminated sites being remediated for unrestricted release. This paper reviews this cleanup guideline and discusses its implementation by Bureau of Radiation staff. A cleanup guideline (1) has been adopted by the State of New York which applies to residual radiological contamination on sites undergoing remediation for unrestricted use. The guideline is flexible and allows for alternative site cleanup approaches. The application of this guidance by radiation control program staff is discussed herein. There may be a need to revisit properties that were felt to be open-quotes cleanclose quotes previously - but fail to meet the new guidance

  10. Flood Cleanup to Protect Indoor Air Quality

    Science.gov (United States)

    During a flood cleanup, the indoor air quality in your home or office may appear to be the least of your problems. However, failure to remove contaminated materials and to reduce moisture and humidity can present serious long-term health risks.

  11. Technical evaluation report of the Fort St. Vrain final draft upgraded technical specifications

    International Nuclear Information System (INIS)

    Kimura, C.Y.

    1989-01-01

    This report is a technical evaluation of the final draft of the Fort St. Vrain (FSV) Upgraded Technical Specifications (UT/S) as issued by Public Service of Colorado (PSC) on May 27, 1988 with subsequent supplemental updates issued on June 15, 1988 and August 5, 1988. It has been compared for consistency, and safety conservatism with the Fort St. Vrain (FSV) Updated Final Safety Analysis Report (FSAR), the FSV Safety Evaluation Report (SER), the Facility Operating License, DPR-34, and all amendments to the Facility Operating License issued as of June 1, 1988, and Appendix A to the Operating License DPR-34, Technical Specifications. Because of the age of the plant, no supplements to the Fort St. Vrain SER have been issued since the original SER was not issued as a WASH or a NUREG report. This made it necessary to review all amendments to the Facility Operating License since they would contain the safety evaluations done to support changes to the Facility Operating License. The upgraded Fort St. Vrain Technical Specifications were also broadly compared with the latest Westinghouse Standard Technical Specifications (WSTS) to assure that what was proposed for Fort St. Vrain was consistent with the latest NRC staff practices for standard technical specifications

  12. Technology for the oil spills clean-up which provides preliminary accumulation of sorbents into the area of emergence and localization oil spills

    Directory of Open Access Journals (Sweden)

    M.L.Soroka

    2012-12-01

    Full Text Available Introduction: The implementation of measures for the prevention and spill of dangerous goods is an important aspect of sustainable development of railway transport. oil spills accident are the most dangerous. They are accompanied by significant pollution of all environmental objects. Studying and development of oil localization and clean-up technologies of such accidents is an important problem of environmental protection to modern conditions of railway transport development. The purpose: to improve the effectiveness of traditional methods of oil spill elimination and the development of new clean-up technologies adapted to the real conditions of the railway transport of Ukraine. Methods: To achieve the research purposes was used analysis of material flows, typical for places emergence and localization of the oil spill on the railways. Results: Analysis of standard technological scheme for the oil spills eliminations has shown that the most difficult task of effective clean-up surfaces is the timely delivery of oil sorbents and special equipment to the area spill containment. The general effectiveness of the elimination activities specifies the time from the beginning contact of dangerous goods with environmental objects to the absorption it into the structure of sorbent . Us was developed the technological scheme of oil spill elimination. This scheme provide a permanent and fast access to the sorbents into the oil spill localization area. It was proposed to device that allows you to transport the sorbent into sorption booms directly on the tank for transportation of petroleum products. Conclusions: Preventative accumulation of sorbents to the oil spill elimination into the localization area provides the organizational and operational simplicity of all stages of clean-up technology. Technical and economic assessment shows that the proposed technology is effective, technologically feasible and economically competitive.

  13. Technical resolution of Generic Safety Issue A-29

    International Nuclear Information System (INIS)

    1989-09-01

    This report summarizes key technical findings related to Generic Safety Issue A-29, ''Nuclear Power Plant Design for Reduction of Vulnerability to Industrial Sabotage.'' The findings in this report deal with (1) a historical review of reported sabotage-related events at nuclear facilities, (2) NRC physical security requirements, (3) industry measures to prevent/mitigate sabotage, (4) design and procedural approaches that could be used to deter sabotage, (5) current NRC and industry initiatives aimed at personnel screening and selection, and (6) design considerations applicable to Advanced Light Water Reactors (ALWRs). The results reveal that insider sabotage at operating nuclear plants has not been a significant problem in the United States to date and that there are no singular design modifications or procedures that by themselves would completely eliminate or mitigate the threat of insider sabotage. Rather, it will take a combination of systematic and focused improvements in the three areas of reliable personnel, effective design features, and plant procedures developed to provide a strategy to deal with prevention of insider sabotage and to be able to mitigate adverse actions. 24 refs., 2 figs., 5 tabs

  14. Approaching socio-technical issues in Knowledge Communication

    DEFF Research Database (Denmark)

    Kampf, Constance; Islas Sedano, Carolina

    2008-01-01

    This paper looks at the connection between technology, knowledge management and knowledge communication theory from a process perspective. Knowledge management and knowledge communication processes are examined through the iterations in creating project goals and objectives which connect the social...... and objectives with respect to knowledge communication theory, demonstrating the potential of knowledge communication concepts for socio-technical design processes, as well as the implications of socio-technical design processes in extending our understanding of knowledge communication....

  15. Proceedings of the 26. Arctic and Marine Oilspill Program (AMOP) Technical Seminar

    International Nuclear Information System (INIS)

    2003-01-01

    The papers presented at this Arctic and Marine Oilspill Program (AMOP) technical seminar reviewed the latest technologies that can be applied to the recovery and mitigation of marine oil spills. The very first seminar was held back in 1976 in response to public concerns regarding the potential for oil spills associated with offshore drilling in the Beaufort Sea in the Canadian Arctic. This twenty-sixth issue includes an appendix listing more than 1,200 AMOP papers from the first 25 years of the conference. Today, the AMOP conference has become international in nature and is the only surviving technical conference on oil spill science and technology in the world. While technical presentations about oil spills are the primary focus of the conference, many presentations also deal with other topics of interest, including contingency planning and legislation. In recent years, the conference has attracted about 200 people each year from 20 countries. The different sessions at this conference were entitled: (1) physical and chemical properties and behaviour of spilled oil, (2) activity updates and contingency planning, (3) detection, tracking and remote sensing, (4) biological effects of oil and hydrocarbons and oil biodegradation, (5) technical seminar on chemical spills with a special session on counter-terrorism, (6) technical seminar on chemical spills, (7) containment and recovery, (8) BIOSS, (9) in-situ burning and shoreline protection and cleanup, (10) oil spill treating agents, (11) spill modelling, and, (12) recent spill experiences. Several presentations described the process of oil in water interactions and were aimed at optimizing response functions, strategy development for marine oil spill response, equipment deployment, containment, recovery, and shoreline assessment. Several studies also presented new treatments for oil spills. Relevant papers and/or presentations were indexed separately for inclusion in the database

  16. San Diego perspective on UST clean-ups

    International Nuclear Information System (INIS)

    Anderson, J.P.

    1996-01-01

    In June 1994, CalEPA State Water Resources Control Board (State Board) contracted with the Lawrence Livermore National Laboratory/University of California (LLNL/UC) to review the current UST regulatory framework and cleanup process. As a result of their review, LLNL/UC recommended changes to expedite the cleanup process at leaking UST sites. The LLNL/UC report concludes that natural attenuation of petroleum is an important factor in stabilizing plumes and may be the only remedial activity necessary in the absence of the source. After a review of existing literature and a study of selected leaking UST cases primarily from Coastal Range sedimentary or valley alluvium hydrogeochemical provinces, the LLNL/UC report found that petroleum plumes tend to stabilize close to the source, generally occur in shallow groundwater, and rarely impact drinking water wells in the state. The study and report recommendations focused solely on fuel petroleum hydrocarbon constituents

  17. Technical Issues Map for the NHI System Interface and Support Systems Area: 2nd Quarter FY07

    International Nuclear Information System (INIS)

    Steven R. Sherman

    2007-01-01

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway in the 2nd quarter of FY07

  18. Development of a matrix approach to estimate soil clean-up levels for BTEX compounds

    International Nuclear Information System (INIS)

    Erbas-White, I.; San Juan, C.

    1993-01-01

    A draft state-of-the-art matrix approach has been developed for the State of Washington to estimate clean-up levels for benzene, toluene, ethylbenzene and xylene (BTEX) in deep soils based on an endangerment approach to groundwater. Derived soil clean-up levels are estimated using a combination of two computer models, MULTIMED and VLEACH. The matrix uses a simple scoring system that is used to assign a score at a given site based on the parameters such as depth to groundwater, mean annual precipitation, type of soil, distance to potential groundwater receptor and the volume of contaminated soil. The total score is then used to obtain a soil clean-up level from a table. The general approach used involves the utilization of computer models to back-calculate soil contaminant levels in the vadose zone that would create that particular contaminant concentration in groundwater at a given receptor. This usually takes a few iterations of trial runs to estimate the clean-up levels since the models use the soil clean-up levels as ''input'' and the groundwater levels as ''output.'' The selected contaminant levels in groundwater are Model Toxic control Act (MTCA) values used in the State of Washington

  19. From Cleanup to Stewardship. A companion report to Accelerating Cleanup: Paths to Closure and background information to support the scoping process required for the 1998 PEIS Settlement Study

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1999-10-01

    Long-term stewardship is expected to be needed at more than 100 DOE sites after DOE's Environmental Management program completes disposal, stabilization, and restoration operations to address waste and contamination resulting from nuclear research and nuclear weapons production conducted over the past 50 years. From Cleanup to stewardship provides background information on the Department of Energy (DOE) long-term stewardship obligations and activities. This document begins to examine the transition from cleanup to long-term stewardship, and it fulfills the Secretary's commitment to the President in the 1999 Performance Agreement to provide a companion report to the Department's Accelerating Cleanup: Paths to Closure report. It also provides background information to support the scoping process required for a study on long-term stewardship required by a 1998 Settlement Agreement.

  20. Warm Cleanup of Coal-Derived Syngas: Multicontaminant Removal Process Demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Spies, Kurt A.; Rainbolt, James E.; Li, Xiaohong S.; Braunberger, Beau; Li, Liyu; King, David L.; Dagle, Robert A.

    2017-02-15

    Warm cleanup of coal- or biomass-derived syngas requires sorbent and catalytic beds to protect downstream processes and catalysts from fouling. Sulfur is particularly harmful because even parts-per-million amounts are sufficient to poison downstream synthesis catalysts. Zinc oxide (ZnO) is a conventional sorbent for sulfur removal; however, its operational performance using real gasifier-derived syngas and in an integrated warm cleanup process is not well reported. In this paper, we report the optimal temperature for bulk desulfurization to be 450oC, while removal of sulfur to parts-per-billion levels requires a lower temperature of approximately 350oC. Under these conditions, we found that sulfur in the form of both hydrogen sulfide and carbonyl sulfide could be absorbed equally well using ZnO. For long-term operation, sorbent regeneration is desirable to minimize process costs. Over the course of five sulfidation and regeneration cycles, a ZnO bed lost about a third of its initial sulfur capacity, however sorbent capacity stabilized. Here, we also demonstrate, at the bench-scale, a process and materials used for warm cleanup of coal-derived syngas using five operations: 1) Na2CO3 for HCl removal, 2) regenerable ZnO beds for bulk sulfur removal, 3) a second ZnO bed for trace sulfur removal, 4) a Ni-Cu/C sorbent for multi-contaminant inorganic removal, and 5) a Ir-Ni/MgAl2O4 catalyst employed for ammonia decomposition and tar and light hydrocarbon steam reforming. Syngas cleanup was demonstrated through successful long-term performance of a poison-sensitive, Cu-based, water-gas-shift catalyst placed downstream of the cleanup process train. The tar reformer is an important and necessary operation with this particular gasification system; its inclusion was the difference between deactivating the water-gas catalyst with carbon deposition and successful 100-hour testing using 1 LPM of coal-derived syngas.

  1. SKB annual report 1993. Including summaries of technical reports issued during 1993

    International Nuclear Information System (INIS)

    1994-05-01

    This is the annual report on the activities of the Swedish Nuclear and Waste Management Co., SKB. It contains in part I an overview of SKB activities in different fields. Part II gives a description of the research and development work on nuclear waste disposal performed during 1993. Lectures and publications during 1993 as well as reports issued in the SKB technical series are listed in part III. Part IV contains the summaries of all technical reports issued during 1993. SKB is the owner of CLAB, the Central Facility for Interim Storage of Spent Nuclear Fuel, located at Oskarshamn. CLAB was taken into operation in July 1985 and to the end of 1993 in total 1 885 tonnes of spent fuel (measured as uranium) have been received. Transportation from the nuclear sites to CLAB is made by a special ship, M/S Sigyn. At Forsmark the final repository for Radioactive Waste - SFR - was taken into operation in April 1988. The repository is situated in crystalline rock under the Baltic Sea. At the end of 1993 a total of 13 000 m 3 of waste have been deposited in SFR. SKB is in charge of a comprehensive research and development programme on geological disposal of nuclear waste. Some of the main areas for SKB research are: Groundwater movements; Bedrock stability; Groundwater chemistry and nuclide migration; Methods and instruments for in situ characterization of crystalline bedrock; Characterization and leaching of spent nuclear fuel; Properties of bentonite for buffer, backfilling and sealing; Radionuclide transport in biosphere and dose evaluations; Development of performance and safety assessment methodology and assessment models; Construction of an underground research laboratory

  2. Type B liquid package technical issues -- Experience with LR-56 safety analysis

    International Nuclear Information System (INIS)

    Smith, A.C.; Alstine, M.N. van; Gromada, R.J.; Hensel, S.J.; Gupta, N.K.

    1997-01-01

    In the course of the development of nuclear industry in France, shipment of Type B quantities (i.e., quantities having significant radiological consequences) of radioactive liquids between different, sites became necessary. Based on the experience acquired at the Commissariat a l'Energie Atomique (CEA) nuclear centers, a series of tanker trailers has been developed to meet this need. Similarly, as part of the ongoing program to process wastes to stable end forms, a need exists to move radioactive liquids at several DOE sites. The LR-56, developed by CEA to transport liquids of medium to high activity, was selected for these US applications, based on its design features and successful operating experience in France. No comparable Type B liquid packages are certified in the US Packages employed in transport of Type B quantities of liquids are either only suitable for small volumes, or are used within site boundaries with extensive administrative controls employed to insure that an adequate level of safety is maintained. The requirement is to provide safety equivalent to the level established by federal regulations in 10 CFR 71. Type B radioactive materials packages (RAM packages) are typically simple, rugged containers which are designed and fabricated in accordance with the ASME Boiler and Pressure Vessel Code to provide containment under the normal conditions of transport (NCT) and hypothetical accident conditions (HAC) established by the regulations. Packages designed for liquid contents must address a number of technical issues which are not common to packages for solid contents. This paper reviews the technical issues associated with Type B liquid packages from the perspective of the experience gained from the evaluation of the LR-56 for use at DOE sites

  3. Cleanup levels for Am-241, Pu-239, U-234, U-235 and U-238 in soils at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Roberts, R.; Colby, B.; Brooks, L.; Slaten, S.

    1997-01-01

    This presentation briefly outlines a cleanup program at a Rocky Flats site through viewgraphs and an executive summary. Exposure pathway analyses to be performed are identified, and decontamination levels are listed for open space and office worker exposure areas. The executive summary very briefly describes the technical approach, RESRAD computer code to be used for analyses, recommendations for exposure levels, and application of action levels to multiple radionuclide contamination. Determination of action levels for surface and subsurface soils, based on radiation doses, is discussed. 1 tab

  4. Technical Targets - A Tool to Support Strategic Planning in the Subsurface Contaminants Focus Area

    International Nuclear Information System (INIS)

    Looney, B.B.

    2002-01-01

    The Subsurface Contaminants Focus Area (SCFA) is supported by a lead laboratory consisting of technical representatives from DOE laboratories across the country. This broadly representative scientific group has developed and implemented a process to define Technical Targets to assist the SCFA in strategic planning and in managing their environmental research and development portfolio. At an initial meeting in Golden Colorado, an initial set of Technical Targets was identified using a rapid consensus based technical triage process. Thirteen Technical Targets were identified and described. Vital scientific and technical objectives were generated for each target. The targets generally fall into one of the following five strategic investment categories: Enhancing Environmental Stewardship, Eliminating Contaminant Sources, Isolating Contaminants, Controlling Contaminant Plumes, Enabling DOEs CleanUp Efforts. The resulting targets and the detail they comprise on what is, and what is not, needed to meet Environmental Management needs provide a comprehensive technically-based framework to assist in prioritizing future work and in managing the SCFA program

  5. Summary of Model Toxics Control Act (MTCA) Potential Impacts Related to Hanford Cleanup and the Tri-Party Agreement (TPA)

    Energy Technology Data Exchange (ETDEWEB)

    IWATATE, D.F.

    2000-07-14

    This white paper provides an initial assessment of the potential impacts of the Model Toxics Control Act (MTCA) regulations (and proposed revisions) on the Hanford site cleanup and addresses concerns that MTCA might impose inappropriate or unachievable clean-up levels and drive clean-up costs higher. The white paper and supporting documentation (Appendices A and B) provide DOE with a concise and up-to-date review of potential MTCA impacts to cost and schedule for the Hanford site activities. MTCA, Chapter 70.105D RCW, is the State of Washington's risk based law governing clean-up of contaminated sites and is implemented by The Washington Department of Ecology (Ecology) under the MTCA Clean-up Regulations, Chapter 173-340 WAC. Hanford cleanup is subject to the MTCA requirements as Applicable, Relevant and Appropriate Requirements (ARARs) for those areas of Hanford being managed under the authority of the Federal Resource Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), and the state Dangerous Waste Regulations. MTCA provides Ecology with authority to implement site clean-up actions under both the federal RCRA and CERCLA regulations as well as the state regulations. Most of the Hanford clean-up actions are being implemented under the CERCLA program, however, there is a trend is toward increased use of MTCA procedures and standards. The application of MTCA to the Hanford clean-up has been an evolving process with some of the Hanford clean-up actions considering MTCA standards as an ARAR and using MTCA procedures for remedy selection. The increased use and application of MTCA standards and procedures could potentially impact both cost and schedule for the Hanford cleanup.

  6. Analysis of the Current Technical Issues on ASME Code and Standard for Nuclear Mechanical Design(2009)

    International Nuclear Information System (INIS)

    Koo, Gyeong Hoi; Lee, B. S.; Yoo, S. H.

    2009-11-01

    This report describes the analysis on the current revision movement related to the mechanical design issues of the U.S ASME nuclear code and standard. ASME nuclear mechanical design in this report is composed of the nuclear material, primary system, secondary system and high temperature reactor. This report includes the countermeasures based on the ASME Code meeting for current issues of each major field. KAMC(ASME Mirror Committee) of this project is willing to reflect a standpoint of the domestic nuclear industry on ASME nuclear mechanical design and play a technical bridge role for the domestic nuclear industry in ASME Codes application

  7. Analysis of the Current Technical Issues on ASME Code and Standard for Nuclear Mechanical Design(2009)

    Energy Technology Data Exchange (ETDEWEB)

    Koo, Gyeong Hoi; Lee, B. S.; Yoo, S. H.

    2009-11-15

    This report describes the analysis on the current revision movement related to the mechanical design issues of the U.S ASME nuclear code and standard. ASME nuclear mechanical design in this report is composed of the nuclear material, primary system, secondary system and high temperature reactor. This report includes the countermeasures based on the ASME Code meeting for current issues of each major field. KAMC(ASME Mirror Committee) of this project is willing to reflect a standpoint of the domestic nuclear industry on ASME nuclear mechanical design and play a technical bridge role for the domestic nuclear industry in ASME Codes application

  8. Coolant cleanup system for BWR type reactor

    International Nuclear Information System (INIS)

    Kinoshita, Shoichiro; Araki, Hidefumi.

    1993-01-01

    The cleanup system of the present invention removes impurity ions and floating materials accumulated in a reactor during evaporation of coolants in the nuclear reactor. That is, coolants pass pipelines from a pressure vessel using pressure difference between a high pressure in the pressure vessel and a low pressure at the upstream of a condensate filtration/desalting device of a condensate/feed water system as a driving source, during which cations and floating materials are removed in a high temperature filtration/desalting device and coolants flow into the condensate/feedwater system. Impurities containing anions are removed here by the condensates filtration/desalting device. Then, they return to the pressure vessel while pressurized and heated by a condensate pump, a feed water pump and a feed water heater. At least pumps, a heat exchanger for heating, a filtration/desalting device for removing anions and pipelines connecting them used exclusively for the coolant cleanup system are no more necessary. (I.S.)

  9. A tritium vessel cleanup experiment in TFTR

    International Nuclear Information System (INIS)

    Caorlin, M.; Kamperschroer, J.; Owens, D.K.; Voorhees, D.; Mueller, D.; Ramsey, A.T.; La Marche, P.H.; Loughlin, M.J.

    1995-03-01

    A simple tritium cleanup experiment was carried out in TFTR following the initial high power deuterium-tritium discharges in December 1993. A series of 34 ohmic and deuterium neutral beam fueled shots was used to study the removal of tritium implanted into the wall and limiters. A very large plasma was created in each discharge to ''scrub'' an area as large as possible. Beam-fueled shots at 2.5 to 7.5 MW of injected power were used to monitor tritium concentration levels in the plasma by detection of DT-neutrons. The neutron signal decreased by a factor of 4 during the experiment, remaining well above the expected T-burnup level. The amount of tritium recovered at the end of the cleanup was about 8% of the amount previously injected with high power DT discharges. The experience gained suggests that measurements of tritium inventory in the torus are very difficult to execute and require dedicated systems with overall accuracy of 1%

  10. Engaging Local Stakeholders on Technical Issues: Test Case at the La Hague Reprocessing Plant - 59211

    International Nuclear Information System (INIS)

    Gilli, Ludivine

    2012-01-01

    In 2009 and 2010, the Institute for Nuclear Safety and Radiation Protection (IRSN) lead a pilot action dealing with the decommissioning of a workshop located on the site of Areva's La Hague fuel-reprocessing plant site in Northwestern France. The purpose of the pilot program was to test ways for IRSN and a few local stakeholders (Non-Governmental Organizations (NGOs) members, local elected officials, etc.) to engage in technical discussions. The discussions were intended to enable the local stakeholders to review the operator's decommissioning application and provide input. The pilot program confirmed there is a definite challenge in successfully opening a meaningful dialogue to discuss technical issues. Three factors influence the extent of the challenge: the knowledge gap between experts and local stakeholders, the conflict between transparency and confidentiality which is inherent with technical topics, and the difficulty for an official expertise institute to hold a dialogue with 'outsiders' during an ongoing reviewing process in which it is participating. The pilot program, given its mixed results, also provided valuable lessons for further improvement of stakeholders' involvement. (authors)

  11. Cancer incidence and thyroid disease among Estonian Chernobyl clean-up workers

    Energy Technology Data Exchange (ETDEWEB)

    Auvinen, A; Salomaa, S [eds.; Radiation and Nuclear Safety Authority, Helsinki (Finland); Rahu, M; Veidebaum, T; Tekkel, M [eds.; Inst. of Experimental and Clinical Medicine, Tallinn (Estonia); Hakulinen, T [ed.; Finnish Cancer Registry, Helsinki (Finland); Boice, Jr, J D [ed.; Int. Epidemiology Inst., MD (United States)

    1998-09-01

    The report describes the development and summarizes the results of the project Cancer incidence and thyroid disease among Estonian Chernobyl clean-up workers. One of the goals of the report is to give research protocols and questionnaires for researchers involved in other studies. Eight previously published articles are also included summarizing the results. The development of the collaboration work of the project is described in the introduction of the report. Epidemiological methods are described in an article complemented by the protocol and English version of the questionnaire administered to all cleanup workers, as well as the data collection form of the thyroid study. The results from biological biodosimetry using both glycophorin A and FISH methods have shown that the radiation doses received by the Chernobyl cleanup workers were relatively low. Thyroid nodularity was not associated with any radiation exposure characteristic in the thyroid screening study. Estonian Chernobyl cleanup workers were followed up for cancer incidence through the Estonian Cancer Registry. No cases of leukemia or thyroid cancer were observed by the end of 1993. It is too early to observe possible effect on other types of cancer. However, mortality from suicides was increased compared with general population. Further follow-up and the extension to other Baltic countries in the future will undoubtedly strengthen the study. There are also plans for future projects covering areas from psychosocial factors to radiation biology

  12. Critical technical issues and evaluation and comparison studies for inertial fusion energy reactors

    International Nuclear Information System (INIS)

    Abdou, M.A.; Ying, A.Y.; Tillack, M.S.; Ghoniem, N.M.; Waganer, L.M.; Driemeyer, D.E.; Linford, G.J.; Drake, D.J.

    1994-01-01

    The critical issues, evaluation and comparison of two inertial fusion energy (IFE) reactor design concepts developed in the Prometheus studies are presented. The objectives were (1) to identify and characterize the critical issues and the R and D required to solve them, and (2) to establish a sound basis for future IFE technical and programmatic decisions by evaluating and comparing the different design concepts. Quantitative evaluation and comparison of the two design options have been made with special focus on physics feasibility, engineering feasibility, economics, safety and environment, and research and development (R and D) requirements. Two key conclusions are made based on the overall evaluation analysis: (1) The heavy-ion driven reactors appear to have an overall advantage over laser-driven reactors; and: (2) The differences in scores are not large and future results of R and D could change the overall ranking of the two IFE concepts

  13. Introduction to the special issue on the technical status of materials for a fusion reactor

    Science.gov (United States)

    Stork, D.; Zinkle, S. J.

    2017-09-01

    Materials determine in a fundamental way the performance and environmental attractiveness of a fusion reactor: through the size (power fluxes to the divertor, neutron fluxes to the first wall); economics (replacement lifetime of critical in-vessel components, thermodynamic efficiency through operating temperature etc); plasma performance (erosion by plasma fluxes to the divertor surfaces); robustness against off-normal accidents (safety); and the effects of post-operation radioactivity on waste disposal and maintenance. The major philosophies and methodologies used to formulate programmes for the development of fusion materials are outlined, as the basis for other articles in this special issue, which deal with the fundamental understanding of the issues regarding these materials and their technical status and prospects for development.

  14. Editorial HPJ Special Issue Introduction

    International Nuclear Information System (INIS)

    Farfan, E.

    2011-01-01

    Radioecology is the study of the fate and transport and potential effects of radionuclides and associated contaminants in the environment. In short, it is the science that describes the fundamental connection between environmental health and human health risks. As such, radioecology can and has provided the credible, consistent and defensible basis for the successful and cost-effective environmental cleanup and closure of nuclear production and waste sites. In addition, radioecology also provides the technical basis for making timely and reliable decisions on cleanup in the aftermath of nuclear incidents such as Chernobyl and Fukushima. The 1986 Chernobyl Nuclear Power Plant (ChNPP) accident resulted in catastrophic health, social, and economic consequences in many countries, predominantly, Ukraine, Belarus, and Russia. The extent of radioactive contamination, levels and forms of contamination, and diversity of the ecosystems affected by the accident did not have any precedent and provided unique opportunities for environmental scientists around the world. Following the natural course of their development, populations of species and their communities found themselves in conditions of chronic radiation exposure that exceeded the natural background by factors of hundreds and thousands. Anything similar would have been extremely difficult if not impossible to recreate in a scientific laboratory. Consequently, since the first few years after the accident, many teams of scientists have visited the Chernobyl Exclusion Zone (ChEZ). The knowledge gained by studying the consequences of this accident has tremendous importance. The concept of an international research and technical center to address the problems involving nuclear and radiological accidents became a reality with the establishment of the International Chernobyl Center (ICC). In May 1995, the US and Ukraine signed a Protocol of Intent on establishment of the ICC, and the government of Ukraine appealed to the

  15. Glufosinate ammonium clean-up procedure from water samples using SPE

    Science.gov (United States)

    Tayeb M., A.; Ismail B., S.; Mardiana-Jansar, K.; Ta, Goh Choo; Agustar, Hani Kartini

    2015-09-01

    For the determination of glufosinate ammonium residue in soil and water samples, different solid phase extraction (SPE) sorbent efficiency was studied. Four different SPE sorbents i.e.: CROMABOND PS-H+, CROMABOND PS-OH-, ISOLUTE ENV+, Water Sep-Pak and OASIS HLB were used. Sample clean-up performance was evaluated using high performance liquid chromatography (Agilent 1220 infinity LC) with fluorescence detector. Detection of FMO-derivatives was done at λ ex = 260 nm and λ em= 310 nm. OASIS HLB column was the most suitable for the clean-up in view of the overall feasibility of the analysis.

  16. The Office of Technology Development technical reports. A bibliography

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The US Department of Energy`s Office of Technology Development (OTD) within the Office of Environmental Management was established in 1989 to conduct an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT&E) for innovative environmental cleanup solutions that are safer and more time- and cost-effective than those currently available. In many cases, the development of new technology presents the best hope for ensuring a substantive reduction in risk to the environment and improved worker/public safety within realistic financial constraints. Five major remediation and waste management problem areas have been identified to date within the DOE weapons complex; Contaminant Plume Containment and Remediation; Mixed Waste Characterization, Treatment, and Disposal; High-Level Waste Tank Remediation; Landfill Stabilization; and Facility Transitioning, Decommissioning, and Final Disposition. New technologies to address these problem areas are demonstrated to the point that they are proven to work and that they can be transferred to the private sector end-users. This bibliography contains information on scientific and technical reports sponsored by the Office of Environmental Management from its inception in 1989 through June 1994. Future issues contain reports from Technology Development activities and will be published biannually.

  17. Biological effects of three different shoreline cleanup methods

    Energy Technology Data Exchange (ETDEWEB)

    Mattsson, J.; Lethinen, C.; Linden, O.

    1981-06-01

    In order to simulate a real oil spill the shore of a small island in the Baltic proper was treated with a weathered crude oil. The aim of the study was to investigate and compare environmental impact of some shoreline cleanup techniques as well as the effectiveness of these methods. Hot water was the quickest cleanup method, whereas cleaning with a solvent took twice as much time and mechanical recovery three and a half time as much. The hot water treatment resulted in the smallest amounts of oil left in the soil compared to the two other methods, where two to three times as much was left. The oil content in sedimenting material and in mussels was highest outside the area cleaned with hot water. The oil content in mussel tissues increased 75 times after cleaning and the sediment contained about twice as much oil as outside the other areas. The vegetation on all four oiled areas was considerably reduced and the soil fauna was completely eliminated. Since no animals were found on the four oiled areas, not even on the untreated area, it appeared to be the oil itself that caused this effect. The number of animals caught with pitfall traps decreased after oiling and cleanup to between 10-40 % of the original amount. The results from the investigation of the fauna in the Cladophora-belt do not indicate any effects so far.

  18. Proceedings of the 30. Arctic and Marine Oilspill Program (AMOP) Technical Seminar

    International Nuclear Information System (INIS)

    2007-01-01

    This conference was a forum for technology transfer among professionals working in the field of Arctic and marine oil spills, spill assessment, cleanup and control. It was attended by researchers developing oil spill countermeasures technology as well as regulators interested in controlling and managing oil spills. The conference included a technical seminar on chemical spills (TSOCS) for those involved in preventing, managing and controlling spills of hazardous materials. Biological solutions for remediating and rehabilitating contaminated sites were also presented. The presentations on leading-edge technologies used in marine oil spill response operations were presented during different sessions of the conference entitled: (1) physical and chemical properties and behaviour of spilled oil, (2) oil spill treating agents, (3) activity updates and contingency planning, (4) biological effects of oil and hydrocarbons and oil biodegradation, (5) containment and recovery, (6) shoreline protection and cleanup/in-situ burning, (7) detection, tracking and remote sensing, and (8) spill modelling. In addition to a poster session with papers, the conference also featured a technical seminar on chemical spills with a special session on DRDC field trials. The conference featured 55 presentations, of which 36 have been catalogued separately for inclusion in this database. refs., tabs., figs

  19. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site

    International Nuclear Information System (INIS)

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m 2 grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards

  20. BWR feedwater nozzle and control rod drive return line nozzle cracking: resolution of generic technical activity A-10. Technical report

    International Nuclear Information System (INIS)

    Snaider, R.

    1980-11-01

    This report summarizes work performed by the NRC staff in the resolution of Generic Technical Activity A-10, 'BWR Nozzle Cracking'. Generic Technical Activity A-10 is one of the generic technical subjects designated as 'unresolved safety issues' pursuant to Section 210 of the Energy Reorganization Act of 1974. The report describes the technical issues, the technical studies and analyses performed by the General Electric Company and the NRC staff, the staff's technical positions based on these studies, and the staff's plans for continued implementation of its technical positions. It also provides information for further work to resolve the non-destructive examination issue

  1. Efficiency enhancement in IGCC power plants with air-blown gasification and hot gas clean-up

    International Nuclear Information System (INIS)

    Giuffrida, Antonio; Romano, Matteo C.; Lozza, Giovanni

    2013-01-01

    Air-blown IGCC systems with hot fuel gas clean-up are investigated. In detail, the gas clean-up station consists of two reactors: in the first, the raw syngas exiting the gasifier and passed through high-temperature syngas coolers is desulfurized by means of a zinc oxide-based sorbent, whereas in the second the sulfided sorbent is duly regenerated. The hot fuel gas clean-up station releases H 2 S-free syngas, which is ready to fuel the combustion turbine after hot gas filtration, and a SO 2 -laden stream, which is successively treated in a wet scrubber. A thermodynamic analysis of two air-blown IGCC systems, the first with cold fuel gas clean-up and the second with hot fuel gas clean-up, both with a state-of-the-art combustion turbine as topping cycle, shows that it is possible to obtain a really attractive net efficiency (more than 51%) for the second system, with significant improvements in comparison with the first system. Nevertheless, higher efficiency is accomplished with a small reduction in the power output and no sensible efficiency improvements seem to be appreciated when the desulfurization temperature increases. Other IGCC systems, with an advanced 1500 °C-class combustion turbine as the result of technology improvements, are investigated as well, with efficiency as high as 53%. - Highlights: ► Hot fuel gas clean-up is a highly favorable technology for IGCC concepts. ► Significant IGCC efficiency improvements are possible with hot fuel gas clean-up. ► Size reductions of several IGCC components are possible. ► Higher desulfurization temperatures do not sensibly affect IGCC efficiency. ► IGCC efficiency as high as 53% is possible with a 1500°C-class combustion turbine

  2. KBS Annual Report 1983. Including summaries of technical reports issued during 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The purpose of the KBS Annual Report is to inform interested organizations and individuals of the research and development work performed by the division KBS within the Swedish Nuclear Fuel Supply Co (SKBF) on the handling, treatment and final storage of nuclear wastes in Sweden. The Annual Report normally contains a presentation of the legal and organizational situation followed by an account of the progress within different areas of the R and D-work. This account also includes indications of the activities planned for the future. At the end of the report the summaries of 76 technical reports and other publications issued during the year are listed in special appendices. (K.A.E.)

  3. Fitness for duty in the nuclear power industry: A review of technical issues

    International Nuclear Information System (INIS)

    Moore, C.; Barnes, V.; Hauth, J.

    1989-05-01

    This report presents information gathered and analyzed in support of the US Nuclear Regulatory Commission's (NRC's) efforts to develop a rule that will ensure that workers with unescorted access to protected areas of nuclear power plants are fit for duty. This report supplements information previously published in NUREG/CR-5227, Fitness for Duty in the Nuclear Power Industry: A Review of Technical Issues (Barnes et al., 1988). The primary potential fitness-for-duty concern addressed in both of these reports is impairment caused by substance abuse, although other fitness concerns are discussed. This report addresses issues pertaining to workers' use and misuse of alcohol, prescription drugs, and over-the-counter drugs as fitness-for-duty concerns; responds to several questions raised by NRC Commissioners; discusses subversion of the chemical testing process and methods of preventing such subversion; and examines concerns about the urinalysis cutoff levels used when testing for marijuana metabolites, amphetamines, and phencyclidine

  4. Cleanup Verification Package for the 300-18 Waste Site

    International Nuclear Information System (INIS)

    Capron, J.M.

    2005-01-01

    This cleanup verification package documents completion of remedial action for the 300-18 waste site. This site was identified as containing radiologically contaminated soil, metal shavings, nuts, bolts, and concrete

  5. An analysis of the CERCLA response program and the RCRA corrective action program in determining cleanup strategies for federal facilities which have been proposed for listing on the National Priorities List

    International Nuclear Information System (INIS)

    Baker, P.; Vinson, R.

    1994-01-01

    This document was prepared as an issue paper for the Department of Energy to serve in the decision-making process for environmental restoration activities. The paper compares cleanup requirements under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and those currently proposed under Subpart S of the Resource Conservation and Recovery Act (RCRA). The history and regulatory framework for both laws is discussed, and the process for environmental restoration actions under both regulatory programs is compared and contrasted. Contaminants regulated under CERCLA and RCRA differ significantly in that radioactive contaminants are subject to Environmental Protection Agency jurisdiction only under CERCLA. The DOE has the jurisdiction to implement radioactive waste management and cleanup levels under the Atomic Energy Act (AEA) at nuclear weapons facilities. For sites with significant amounts of contaminants which are radioactive only, cleanup under RCRA can present significant advantages, since the DOE can then manage restoration activities under its own authority. There are, conversely several significant advantages for a remedial action being conducted at a CERCLA site recognized on the National Priorities List (NPL). Other provisions in the CERCLA remediation and the RCRA corrective action process offer both advantages and disadvantages related to DOE environmental restoration programs. This paper presents a discussion of significant issues which should be considered in such negotiations

  6. The Estonian study of Chernobyl cleanup workers. II. Cohort assembling and questionnaire study

    International Nuclear Information System (INIS)

    Tekkel, Mare; Rahu, Mati; Veidebaum, Toomas

    1999-01-01

    An abridged version of the published paper, Radiation Research 1997, 147, 641-652. A cohort of 4832 Chernobyl cleanup workers from Estonia was assembled. Response rate to the mailed questionnaire was 81.4%. The majority of workers were 20-39 years old, and they were less educated than their counterparts in the general population. Most of the cleanup workers were sent to the Chernobyl area in 1986-1987 and more than half of them spent about three months there. Four hundred and twenty seven cleanup workers worked on the roofs near the damaged reactor, clearing the highly radioactive debris. The most commonly performed task was removal and burial of topsoil (55% of the workers). Potassium iodide was given to over 18% of the men. (author)

  7. Shoreline oil cleanup, recovery and treatment evaluation system (SOCRATES)

    International Nuclear Information System (INIS)

    Rusin, J.; Lunel, T.; Sommerville, M.; Tyler, A.; Marshall, I.

    1996-01-01

    A beach cleanup computer system was developed to mitigate the impact of shoreline oiling. The program, entitled SOCRATES, was meant to determine the most suitable cleanup methodologies for a range of different spill scenarios. The development, operation and capabilities of SOCRATES was described, with recent examples of successful use during the Sea Empress spill. The factors which influenced decision making and which were central to the numerical solution were: (1) the volumetric removal rate of oil, (2) area removal rate of oil, (3) length of oil slick removed per hour, (4) volumetric removal rate of oily waste, (5) area of the oil slick, (6) length of the oil slick, (7) volume of liquid emulsion, and (8) length of beach. 14 figs

  8. Experimental results obtained with the simulated cold moderator system. System characteristics and technical issues

    CERN Document Server

    Aso, T; Hino, R; Kaminaga, M; Kinoshita, H; Takahashi, T

    2002-01-01

    The Japan Atomic Energy Research Institute and the High Energy Accelerator Research Organization have been developing a Mega-Watt scale spallation target system. In the system, neutrons generated in a target are sorted out their energy to the proper values in liquid-hydrogen moderators. Then, the liquid-hydrogen is forced to circulate in order to suppress hydrogen temperature increase. In the operation of moderators, it is very important to establish a safety protection system against emergency shutdown of the accelerator or accidents of the cold moderator system. In order to obtain a technical data for design and safety review of the liquid-hydrogen system, we have fabricated an experimental apparatus simulated the cold moderator system using liquid nitrogen (max. 1.5 MPa, mini. 77 K) instead of liquid hydrogen. The experiments on a controllability of the system were carried out to investigate dynamic characteristics of the system. This report presents the experimental results and technical issues for the co...

  9. Characterization of plutonium contamination at Maralinga: Dosimetry and cleanup criteria

    International Nuclear Information System (INIS)

    Cooper, M.B.; Martin, L.J.; Williams, G.A.; Harries, J.R.

    2000-01-01

    An area of South Australia remained contaminated following British atomic tests at Maralinga during 1955-1963. Of importance is the long lived 239 Pu of which some 24 kg was explosively dispersed in several 'minor trials'. The extent, quantities and physical characteristics of the plutonium have been assessed and estimates of dose, dominated by the inhalation pathway in the critical group of Aborigines living a semi-traditional lifestyle, have been made for potential occupants. Dosimetry, together with social and economic factors, underpins the setting of cleanup criteria in terms of activity concentrations averaged over large areas and permissible concentrations of contaminated particles. The possibility of intentional behaviour such as fragment scavenging has also influenced limits on particulate contamination. Rehabilitation of the most contaminated areas is underway, with scraping of surface soil and burial on site completed. Vehicular-mounted radiation detector systems for wide area and particle monitoring have been developed, and procedures established for determining cleanup boundaries and for the verification monitoring to ensure that the cleanup process has met the specified criteria. Data are being obtained for a final dose and health risk assessment of the cleaned up site. (author)

  10. Decontamination issues for chemical and biological warfare agents: how clean is clean enough?

    Science.gov (United States)

    Raber, E; Jin, A; Noonan, K; McGuire, R; Kirvel, R D

    2001-06-01

    The objective of this assessment is to determine what level of cleanup will be required to meet regulatory and stakeholder needs in the case of a chemical and/or biological incident at a civilian facility. A literature review for selected, potential chemical and biological warfare agents shows that dose information is often lacking or controversial. Environmental regulatory limits or other industrial health guidelines that could be used to help establish cleanup concentration levels for such agents are generally unavailable or not applicable for a public setting. Although dose information, cleanup criteria, and decontamination protocols all present challenges to effective planning, several decontamination approaches are available. Such approaches should be combined with risk-informed decision making to establish reasonable cleanup goals for protecting health, property, and resources. Key issues during a risk assessment are to determine exactly what constitutes a safety hazard and whether decontamination is necessary or not for a particular scenario. An important conclusion is that cleanup criteria are site dependent and stakeholder specific. The results of a modeling exercise for two outdoor scenarios are presented to reinforce this conclusion. Public perception of risk to health, public acceptance of recommendations based on scientific criteria, political support, time constraints, and economic concerns must all be addressed in the context of a specific scenario to yield effective and acceptable decontamination.

  11. Remediation of soils contaminated with heavy metals

    Energy Technology Data Exchange (ETDEWEB)

    Boni, M.R.; D' Aprile, L. [Univ. of Rome ' ' La Sapienza' ' , Dept. of Hydraulic Transportation and Roads (Italy)

    2001-07-01

    In December 1999 Italy issued the national regulation (DM 471/99) for the clean-up of contaminated sites. This regulation applies both to derelict and to still operating industrial plants and waste management facilities. Target concentration values for clean-up interventions are issued and the requirements for design and planning of technical operation are defined. The selection of the appropriate clean-up technology are based on the following main criteria: - reduce the concentration in environmental media and the migration of pollutants without removing soil off-site; - in order to reduce contaminated material removal and transportation, remedial actions of soil, subsoil and groundwater should preferably be based on in-situ treatments. In-situ technologies commonly applied in Italy to the remediation of soils contaminated by heavy metals (As, Cd, Cr, Hg, Pb) are: - containment (caps, vertical barriers); - soil flushing; - cement based solidification/stabilization. (orig.)

  12. Biotechnologies for Marine Oil Spill Cleanup: Indissoluble Ties with Microorganisms

    KAUST Repository

    Mapelli, Francesca; Scoma, Alberto; Michoud, Gregoire; Aulenta, Federico; Boon, Nico; Borin, Sara; Kalogerakis, Nicolas; Daffonchio, Daniele

    2017-01-01

    The ubiquitous exploitation of petroleum hydrocarbons (HCs) has been accompanied by accidental spills and chronic pollution in marine ecosystems, including the deep ocean. Physicochemical technologies are available for oil spill cleanup, but HCs must ultimately be mineralized by microorganisms. How environmental factors drive the assembly and activity of HC-degrading microbial communities remains unknown, limiting our capacity to integrate microorganism-based cleanup strategies with current physicochemical remediation technologies. In this review, we summarize recent findings about microbial physiology, metabolism and ecology and describe how microbes can be exploited to create improved biotechnological solutions to clean up marine surface and deep waters, sediments and beaches.

  13. Epidemiology of non-tumor diseases in Chernobyl clean-up workers

    International Nuclear Information System (INIS)

    Buzunov, V.A.; Pirogova, E.A.; Tereshchenko, V.M.; Krasnikova, L.I.; Vojchulene, Yu.S.

    2004-01-01

    Epidemiological study of non-tumor diseases in Chernobyl clean-up workers was effectuated on the materials of State Registry of Ukraine for Victims of Chernobyl NPP Accident. Percent of healthy people among the clean-up workers of 1986 - 1987 decreased from 67.6% in 1988 to 9.6% in 1998, patients with chronic diseases increased from 12,8% in 1988 to 79,1% in 1998. Quantitative risk-analysis proves to possible relationship with absorbed doses prevalences of diseases of blood and hemopoietic organs, coronary hearth disease, cerebrovascular diseases, thyroid pathology. The age at the time of investigation, tobacco smoking and stress were statistically significant non-radiation factors of relative risk

  14. Biotechnologies for Marine Oil Spill Cleanup: Indissoluble Ties with Microorganisms

    KAUST Repository

    Mapelli, Francesca

    2017-05-13

    The ubiquitous exploitation of petroleum hydrocarbons (HCs) has been accompanied by accidental spills and chronic pollution in marine ecosystems, including the deep ocean. Physicochemical technologies are available for oil spill cleanup, but HCs must ultimately be mineralized by microorganisms. How environmental factors drive the assembly and activity of HC-degrading microbial communities remains unknown, limiting our capacity to integrate microorganism-based cleanup strategies with current physicochemical remediation technologies. In this review, we summarize recent findings about microbial physiology, metabolism and ecology and describe how microbes can be exploited to create improved biotechnological solutions to clean up marine surface and deep waters, sediments and beaches.

  15. The role of risk assessment in remedial action cleanup programs (RACP): A case history

    International Nuclear Information System (INIS)

    Fessler, R.G.; Bergmann, W.R.; Greenberg, A.J.

    1988-01-01

    A RACP (Remedial Action Cleanup Program) selects site cleanup criteria that protect human health and the environment and are cost effective. They generally use existing environmental standards and/or guidelines which include safe drinking water, RCRA groundwater protection, threshold limit values and air quality standards, and recommended soil cleanup level guidelines. If these are the only criteria used, the RACP may be more stringent and expensive than necessary. Another step, a risk assessment program, should then be considered in the cleanup decision process. A risk assessment uses chemical concentrations observed in soils, groundwater, and air to project their impact on human health and the environment. Toxicological data on human exposure to these concentrations (LD 50s and carcinogenic action levels) are used to assess risks to human health and the environment. The risk assessment also considers the probability of exposure. E.g., remedial programs at Superfund sites consider three criteria in order to assess risks to human health and the environment: (1) pathways of exposure, (2) population at risk, and (3) chemicals of concern. By eliminating or severely limiting the significance of any criteria, the site may no longer represent a significant risk. This paper presents a RACP case history where a risk assessment was needed to select a cost effective and environmentally acceptable cleanup program

  16. Evaluation of containment failure and cleanup time for Pu shots on the Z machine.

    Energy Technology Data Exchange (ETDEWEB)

    Darby, John L.

    2010-02-01

    Between November 30 and December 11, 2009 an evaluation was performed of the probability of containment failure and the time for cleanup of contamination of the Z machine given failure, for plutonium (Pu) experiments on the Z machine at Sandia National Laboratories (SNL). Due to the unique nature of the problem, there is little quantitative information available for the likelihood of failure of containment components or for the time to cleanup. Information for the evaluation was obtained from Subject Matter Experts (SMEs) at the Z machine facility. The SMEs provided the State of Knowledge (SOK) for the evaluation. There is significant epistemic- or state of knowledge- uncertainty associated with the events that comprise both failure of containment and cleanup. To capture epistemic uncertainty and to allow the SMEs to reason at the fidelity of the SOK, we used the belief/plausibility measure of uncertainty for this evaluation. We quantified two variables: the probability that the Pu containment system fails given a shot on the Z machine, and the time to cleanup Pu contamination in the Z machine given failure of containment. We identified dominant contributors for both the time to cleanup and the probability of containment failure. These results will be used by SNL management to decide the course of action for conducting the Pu experiments on the Z machine.

  17. Environmental biotechnology for waste treatment, environmental science research, Volume 41

    Energy Technology Data Exchange (ETDEWEB)

    Saylor, G.S.; Fox, R.; Blackburn, J.W.

    1991-01-01

    This book contains the proceedings of the symposium entitled [open quotes]Environmental Biotechnology: Moving from the Flask to the Field[close quotes] held in October 17th through 19th, 1990, in Knoxville, Tennessee. Environmental biotechnology involves the use of microorganisms and their processes for the clean-up of environmental contamination, specific examples of which include ground-water treatment, treatment of leachates, and clean-up of contaminated soils, sludges, and sediments. In comparison with other technologies, environmental biotechnology (or bioremediation) has the advantages of affecting mineralization of toxic compounds to innocuous end-products, being energy-effective with processes able to take place at a moderate temperature and pressure, safety, and economy and is, therefore, perceived to hold great potential for environmental clean-up. Bioremediation treatment technologies for contaminated soils and groundwater can take the form of: (1) solid-phase biotreatment; (2) slurry-phase treatment; (3) in situ treatment; and (4) combination biological and physical/chemical treatment. The goal of the symposium was to pressure technical accomplishments at the laboratory and field-scale levels, future technical directions and economic, public and regulatory concerns in environmental biotechnology. The book is divided into five major sections on Current Perceptions, Field-Scale Studies, Technical Issues and Concerns in Implementation, Nontechnical Issues and Concerns in Implementation, International Activities, and ends with a critical review of the symposium.

  18. Multimedia approach to estimating target cleanup levels for soils at hazardous waste sites

    International Nuclear Information System (INIS)

    Hwang, S.T.

    1990-04-01

    Contaminated soils at hazardous and nuclear waste sites pose a potential threat to human health via transport through environmental media and subsequent human intake. To minimize health risks, it is necessary to identify those risks and ensure that appropriate actions are taken to protect public health. The regulatory process may typically include identification of target cleanup levels and evaluation of the effectiveness of remedial alternatives and the corresponding reduction in risks at a site. The US Environmental Protection Agency (EPA) recommends that exposure assessments be combined with toxicity information to quantify the health risk posed by a specific site. This recommendation then forms the basis for establishing target cleanup levels. An exposure assessment must first identify the chemical concentration in a specific medium (soil, water, air, or food), estimate the exposure potential based on human intake from that media, and then combined with health criteria to estimate the upperbound health risks for noncarcinogens and carcinogens. Estimation of target cleanup levels involves the use of these same principles but can occur in reverse order. The procedure starts from establishing a permissible health effect level and ends with an estimated target cleanup level through an exposure assessment process. 17 refs

  19. Preplanning of early cleanup. Annual report 1996

    International Nuclear Information System (INIS)

    1997-01-01

    A pre-study 'Pre-planning of early cleanup after fallout of radioactive material' made by Studvik EcoSafe has pointed out the need and request for pre-planning of actions. Based on the pre-study this project was started with the goal to work out guidelines and checklists. Because of the common interest between the Nordic countries NKS is the organization responsible for the project. The results of the project will be a document pointing out what can be planned in advance, including guidelines and checklists, regarding early cleanup actions after a nuclear plant accident in or in the vicinity of the Nordic countries. In this work 'early' means the three first weeks after an accident. The project only deals with questions concerning external radiation. The document shall be usable by persons in charge of planning or decision makers on the appropriate level of organization for each country. The document shall principally be aimed towards persons without professional competence in the field of radiology. The result will be presented for a limited number of generalized environments and fallout situations: urban/suburban/rural (concentrating on urban/suburban); regional differences (in for example house types and constructing material); dry or wet deposition. Five housing environments, ten cleanup actions and wet or dry deposition are treated. For 66 combinations calculations are made and the results are documented as data sheets, each describing the beneficial effects, costs and disadvantages of application of a feasible method for cleaning in the early phase of a specific type of surface in one of five different urban or suburban environments. This data forms the foundation for the recommendations on guidelines, which are the ultimate goal of the EKO-5 project. (EG)

  20. Cleanup and treatment of radioactively contaminated land including areas near nuclear facilities. A selected bibliography

    International Nuclear Information System (INIS)

    Fore, C.S.; Faust, R.A.; Brewster, R.H.

    1982-09-01

    This annotated bibliography of 337 references summarizes the literature published on the cleanup and treatment of radioactively contaminated land. Specifically, this bibliography focuses on literature concerned with the methods of cleanup and treatment being applied - chemical, physical, or vegetative stabilization; the types of equipment being used; and the influence of climatic conditions on the method selected for use. The emphasis in such literature is placed on hazardous site cleanup efforts that have been completed as well as those that are in progress and are being planned. Appendix A includes 135 additional references to literature identified but not included in the bibliography because of time and funding constraints. Appendix B consists of a table that identifies the cleanup and treatment research conducted at specific sites. All of the information included in this bibliography is stored in a computerized form that is readily available upon request

  1. Hanford Site cleanup and transition: Risk data needs for decision making (Hanford risk data gap analysis decision guide)

    International Nuclear Information System (INIS)

    Gajewski, S.; Glantz, C.; Harper, B.; Bilyard, G.; Miller, P.

    1995-10-01

    Given the broad array of environmental problems, technical alternatives, and outcomes desired by different stakeholders at Hanford, DOE will have to make difficult resource allocations over the next few decades. Although some of these allocations will be driven purely by legal requirements, almost all of the major objectives of the cleanup and economic transition missions involve choices among alternative pathways. This study examined the following questions: what risk information is needed to make good decisions at Hanford; how do those data needs compare to the set(s) of risk data that will be generated by regulatory compliance activities and various non-compliance studies that are also concerned with risk? This analysis examined the Hanford Site missions, the Hanford Strategic Plan, known stakeholder values, and the most important decisions that have to be made at Hanford to determine a minimum domain of risk information required to make good decisions that will withstand legal, political, and technical scrutiny. The primary risk categories include (1) public health, (2) occupational health and safety, (3) ecological integrity, (4) cultural-religious welfare, and (5) socio-economic welfare

  2. Statistical evaluation of cleanup: How should it be done?

    International Nuclear Information System (INIS)

    Gilbert, R.O.

    1993-02-01

    This paper discusses statistical issues that must be addressed when conducting statistical tests for the purpose of evaluating if a site has been remediated to guideline values or standards. The importance of using the Data Quality Objectives (DQO) process to plan and design the sampling plan is emphasized. Other topics discussed are: (1) accounting for the uncertainty of cleanup standards when conducting statistical tests, (2) determining the number of samples and measurements needed to attain specified DQOs, (3) considering whether the appropriate testing philosophy in a given situation is ''guilty until proven innocent'' or ''innocent until proven guilty'' when selecting a statistical test for evaluating the attainment of standards, (4) conducting tests using data sets that contain measurements that have been reported by the laboratory as less than the minimum detectable activity, and (5) selecting statistical tests that are appropriate for risk-based or background-based standards. A recent draft report by Berger that provides guidance on sampling plans and data analyses for final status surveys at US Nuclear Regulatory Commission licensed facilities serves as a focal point for discussion

  3. Resting-state FMRI confounds and cleanup

    Science.gov (United States)

    Murphy, Kevin; Birn, Rasmus M.; Bandettini, Peter A.

    2013-01-01

    The goal of resting-state functional magnetic resonance imaging (FMRI) is to investigate the brain’s functional connections by using the temporal similarity between blood oxygenation level dependent (BOLD) signals in different regions of the brain “at rest” as an indicator of synchronous neural activity. Since this measure relies on the temporal correlation of FMRI signal changes between different parts of the brain, any non-neural activity-related process that affects the signals will influence the measure of functional connectivity, yielding spurious results. To understand the sources of these resting-state FMRI confounds, this article describes the origins of the BOLD signal in terms of MR physics and cerebral physiology. Potential confounds arising from motion, cardiac and respiratory cycles, arterial CO2 concentration, blood pressure/cerebral autoregulation, and vasomotion are discussed. Two classes of techniques to remove confounds from resting-state BOLD time series are reviewed: 1) those utilising external recordings of physiology and 2) data-based cleanup methods that only use the resting-state FMRI data itself. Further methods that remove noise from functional connectivity measures at a group level are also discussed. For successful interpretation of resting-state FMRI comparisons and results, noise cleanup is an often over-looked but essential step in the analysis pipeline. PMID:23571418

  4. Influence of the Chernobyl accident on the frequency of chromosomal damage and health status of Lithuanian clean-up workers

    International Nuclear Information System (INIS)

    Lazutka, R. J.; Ridmeika, G. J.

    2006-01-01

    Chromosomal damage and health status were analyzed in Chernobyl clean-up workers currently residing in Lithuania. Statistically significantly (P < 0.05) increased frequencies of chromosome-type aberrations (chromosome breaks, dicentric and ring chromosomes) as well as aberrant cells were found in the peripheral blood lymphocytes of clean-up workers when measured 6-8 years after the exposure. Significant health impairment was characteristic of these persons as well. On average, 5.6 diseases per patient were diagnosed in clean-up workers suffering from cardiovascular diseases. This high co-morbidity resulted in quite high rates of metabolic syndrome (16.7%). Among Chernobyl clean-up workers that had experienced post-traumatic stress disorder, 76% suffered from highly expressed sleep disturbances. Analysis of thyroid diseases among 500 clean-up workers has revealed that 27.6% individuals have different pathology of thyroid gland. Thus, even 20 years after the Chernobyl disaster, clean-up workers must be considered as a group of primary interest both for researchers and physicians. (author)

  5. Hazardous Waste Cleanup: Veolia ES Technical Solutions, L.L.C. in Middlesex, New Jersey

    Science.gov (United States)

    Veolia ES Technical Solutions is located at 125 Factory Lane in Middlesex, New Jersey. Veolia owns and operates a solvent-reprocessing facility that is located on a four-acre site in an industrial area of Middlesex Borough.

  6. Potential for preparation of hot gas cleanup sorbents from spent hydroprocessing catalysts

    Energy Technology Data Exchange (ETDEWEB)

    Furimsky, E.; Biagini, M. [Canada Centre for Mineral and Energy Technology, Ottawa, ON (Canada). Energy Research Labs.

    1996-01-01

    Three spent-decoked hydroprocessing catalysts and two corresponding fresh catalysts were tested as hot gas clean-up sorbents and compared with the zinc ferrite using a simulated coal gasification gas mixture. The catalysts deposited only by coke exhibited relatively good cleaning efficiency. The catalyst deposited by coke and metals such as vanadium and nickel was less efficient. The useful life of the spent hydroprocessing catalysts may be extended if utilized as hot gas clean-up sorbents. 12 refs., 3 figs., 4 tabs.

  7. Dyscirculatory encephalopathy in Chernobyl disaster clean-up workers (a 20-year study).

    Science.gov (United States)

    Podsonnaya, I V; Shumakher, G I; Golovin, V A

    2010-05-01

    Results obtained over 20-years of following 536 Chernobyl clean-up workers and 436 control subjects are presented. Dyscirculatory encephalopathy developed more frequently in persons exposed to radiation at age 30 years. As compared with the control group, workers were characterized by early onset of disease, faster progression, stable symptomatology for 5-6 years, and further progression of disease in the form of autonomic dysfunction, psycho-organic syndrome, and epilepsy. Major strokes were also more common in clean-up workers.

  8. Green Remediation Best Management Practices: Overview of EPA's Methodology to Address the Environmental Footprint of Site Cleanup

    Science.gov (United States)

    Contaminated site cleanups involving complex activities may benefit from a detailed environmental footprint analysis to inform decision-making about application of suitable best management practices for greener cleanups.

  9. Review of recent ORNL studies in solvent cleanup and diluent degradation. Consolidated Fuel-Reprocessing Program

    International Nuclear Information System (INIS)

    Mailen, J.C.; Tallent, O.K.

    1982-01-01

    Testing of solvent cleanup methods to replace the use of sodium carbonate in the Purex process has been ongoing for several years in order to reduce the quantity of waste sodium nitrate generated and to improve phase separation. Alternate solvent cleanup methods include the use of packed columns of base-treated silica gel or solvent scrubbing with hydrazine oxalate. Degradation of the diluent was shown to generate long-chain organic acids which appear to be the major culprits in the phase separation problems encountered in sodium carbonate scrubbers. Solvent scrubbing with hydrazine oxalate gives improved phase separations. Solvent cleanup in columns packed with base-treated silica gel avoids the phase separation problem since a dispersable aqueous phase is not present. Removals of TBP degradation products and metal-ion complexes by sodium carbonate, hydrazine salts, or by packed beds of base-treated silica gel are all satisfactory. Solvent scrubbing by hydrazine oxalate solutions is the prime candidate for solvent cleanup in fuel reprocessing plants

  10. Surface and subsurface cleanup protocol for radionuclides Gunnison, Colorado, UMTRA Project Processing Site

    International Nuclear Information System (INIS)

    1994-05-01

    The supplemental standards provisions of Title 40, Code of Federal Regulations, Part 192 (40 CFR Part 192) require the cleanup of radionuclides other than radium-226 (Ra-226) to levels ''as low as reasonably achievable'' (ALARA), taking into account site-specific conditions, if sufficient quantities and concentrations are present to constitute a significant radiation hazard. In this context, thorium-230 (Th-230) at the Gunnison, Colorado, processing site will require remediation. However, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Characterization data indicate that in the offpile areas, the removal of residual in situ bulk Ra-226 and Th-230 such that the 1000-year projected Ra-226 concentration (Ra-226 concentration in 1000 years due to the decay of in situ Ra-226 and the in-growth of Ra-226 from in situ Th-230) complies with the US Environmental Protection Agency (EPA) cleanup standard for in situ Ra-226 and the cleanup protocol for in situ Th-230 can be readily achieved using conventional excavation techniques for bulk contamination without encountering significant impacts due to groundwater. The EPA cleanup standard and criterion for Ra-226 and the 1000-year projected Ra-226 are 5 and 15 picocuries per gram (pCi/g) above background, respectively, averaged over 15-centimeter (cm) deep surface and subsurface intervals and 100-square-meter (m 2 ) grid areas. Significant differential migration of Th-230 relative to Ra-226 has occurred over 40 percent of the subpile area. To effectively remediate the site with respect to Ra-226 and Th-230, supplemental standard is proposed and discussed in this report

  11. Impact of Federal R and D funding on Three Mile Island cleanup costs

    International Nuclear Information System (INIS)

    1982-01-01

    The Chairman and the Ranking Minority Member of the House Committee on Interior and Insular Affairs requested that GAO respond to several questions concerning the administration's proposed $123 million in Federal funding for data acquisition and research and development activities during the cleanup of the Three Mile Island nuclear reactor Unit 2. GAO found that: adequate legislative authority exists to support DOE's proposed data acquisition and research and development activities during the cleanup process; adherence to the estimated timetable for cleanup completion will allow DOE to meet its program objectives within the proposed budget, but slippages would probably make additional funding necessary; and the DOE program will reduce the utility company's financial needs by an estimated $66 to $69 million, about one-third of the Federal share proposed by the Governor of Pennsylvania on July 9, 1981

  12. Cleanup operations at the Oak Ridge Gaseous Diffusion Plant contaminated metal scrapyard

    International Nuclear Information System (INIS)

    Williams, L.C.

    1987-01-01

    Cleanup operations at the contaminated metal storage yard located at the Oak Ridge, Tennessee, Gaseous Diffusion Plant have been completed. The storage yard, in existence since the early 1970s, contained an estimated 35,000 tons of mixed-type metals spread over an area of roughly 30 acres. The overall cleanup program required removing the metal from the storage yard, sorting by specific metal types, and size reduction of specific types for future processing. This paper explains the methods and procedures used to accomplish this task

  13. Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update

    International Nuclear Information System (INIS)

    L. V. Street

    2007-01-01

    The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility

  14. Procurement activities required by the nuclear program developed by nuclearelectrica national company- technical issues versus public acquisitions legal issues

    International Nuclear Information System (INIS)

    Vatamanu, Mariana

    2007-01-01

    Public procurement is one of the areas of the single market where the results of the liberalization drive have not yet measured up to expectations. This communication presents some technical issues versus public acquisition legal issues and suggests ways and means of improving contract award procedures. Procurement area includes the acquisition of goods, services and works, thus assumption not only for purchasing equipment, components, spare-parts or materials, but also hiring of the contractors or consultants to carry out services and works. Procurement is related to the function of management of supply, which encompasses aside range of planning function, coding and classification, stockholding policies, store-keeping, stores accounting, etc. but it is also related to the hiring of contractors or consultants for work or services. As an answer to the challenge of the increasing market globalization it has been developed the ISO quality system, within 9000 family of standards. The very intensive competition for all market clients, either locally or globally, encouraged development of a new concept of quality management systems. Due to its specificity of activity and with respect to the rules and legislation requirements imposed either by the internal Romanian Laws and Regulations or/and by international market rules and constrains, the development, construction and operation of a Nuclear Power Plant shall be performed in a controlled condition and based on specific authorizations obtained by the Owner of the NPP from the Romanian Regulatory Authorities. The experience, accumulated by over 10 years of operation of Cernavoda NPP Unit 1 by our company, demonstrates the high importance of the Quality Management System that imposes the quality of the components installed on the plant, the services and the works developed to assure a safety operation of the nuclear unit, with a strongly dependence by the procurement system established for purchasing of goods, services and

  15. Technical Issues in the development of high burnup and long cycle fuel pellets

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Joo; Yang, Jae Ho; Oh, Jang Soo; Kim, Keon Sik; Rhee, Young Woo; Kim, Jong Hun; Nam, Ik Hui [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-10-15

    Over the last half century, a nuclear fuel cycle, a fuel discharged burnup and a uranium enrichment of the LWR (Light Water Reactor) fuel have continuously increased. It was the efforts to reduce the LWR fuel cycle cost, and to make reactor operation more efficiently. Improved fuel and reactor performance contribute further to the reduction and management efficiency of spent fuels. The primary incentive for operating nuclear reactor fuel to higher burnup and longer cycle is the economic benefits. The fuel cycle costs could be reduced by extending fuel discharged burnup and fuel cycle length. The higher discharged burnup can increase the energy production per unit fuel mass or fuel assembly. The longer fuel cycle can increase reactor operation flexibility and reduce the fuel changing operation and the spent fuel management burden. The margin to storage capacity limits would be also increased because high burnup and long cycle fuel reduces the mass of spent fuels. However, increment of fuel burnup and cycle length might result in the acceleration of material aging consisting fuel assembly. Then, the safety and integrity of nuclear fuel will be degraded. Therefore, to simultaneously enhance the safety and economics of the LWR fuel through the fuel burnup and cycle extension, it is indispensable to develop the innovative nuclear fuel material concepts and technologies which can overcome degradation of fuel safety. New fuel research project to extend fuel discharged burnup and cycle length has been launched in KAERI. Main subject is to develop innovative LWR fuel pellets which can provide required fuel performance and safety at extended fuel burnup and cycle length. In order to achieve the mission, we need to know that what the impediments are and how to break through current limit of fuel pellet properties. In this study, the technical issues related to fuel pellets at high burnup were surveyed and summarized. We have collected the technical issues in the literatures

  16. Technical Issues in the development of high burnup and long cycle fuel pellets

    International Nuclear Information System (INIS)

    Kim, Dong Joo; Yang, Jae Ho; Oh, Jang Soo; Kim, Keon Sik; Rhee, Young Woo; Kim, Jong Hun; Nam, Ik Hui

    2012-01-01

    Over the last half century, a nuclear fuel cycle, a fuel discharged burnup and a uranium enrichment of the LWR (Light Water Reactor) fuel have continuously increased. It was the efforts to reduce the LWR fuel cycle cost, and to make reactor operation more efficiently. Improved fuel and reactor performance contribute further to the reduction and management efficiency of spent fuels. The primary incentive for operating nuclear reactor fuel to higher burnup and longer cycle is the economic benefits. The fuel cycle costs could be reduced by extending fuel discharged burnup and fuel cycle length. The higher discharged burnup can increase the energy production per unit fuel mass or fuel assembly. The longer fuel cycle can increase reactor operation flexibility and reduce the fuel changing operation and the spent fuel management burden. The margin to storage capacity limits would be also increased because high burnup and long cycle fuel reduces the mass of spent fuels. However, increment of fuel burnup and cycle length might result in the acceleration of material aging consisting fuel assembly. Then, the safety and integrity of nuclear fuel will be degraded. Therefore, to simultaneously enhance the safety and economics of the LWR fuel through the fuel burnup and cycle extension, it is indispensable to develop the innovative nuclear fuel material concepts and technologies which can overcome degradation of fuel safety. New fuel research project to extend fuel discharged burnup and cycle length has been launched in KAERI. Main subject is to develop innovative LWR fuel pellets which can provide required fuel performance and safety at extended fuel burnup and cycle length. In order to achieve the mission, we need to know that what the impediments are and how to break through current limit of fuel pellet properties. In this study, the technical issues related to fuel pellets at high burnup were surveyed and summarized. We have collected the technical issues in the literatures

  17. Experimental results obtained with the simulated cold moderator system. System characteristics and technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Aso, Tomokazu; Kaminaga, Masanori; Haga, Katsuhiro; Kinoshita, Hidetaka; Takahashi, Toshio; Hino, Ryutaro [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-12-01

    The Japan Atomic Energy Research Institute and the High Energy Accelerator Research Organization have been developing a Mega-Watt scale spallation target system. In the system, neutrons generated in a target are sorted out their energy to the proper values in liquid-hydrogen moderators. Then, the liquid-hydrogen is forced to circulate in order to suppress hydrogen temperature increase. In the operation of moderators, it is very important to establish a safety protection system against emergency shutdown of the accelerator or accidents of the cold moderator system. In order to obtain a technical data for design and safety review of the liquid-hydrogen system, we have fabricated an experimental apparatus simulated the cold moderator system using liquid nitrogen (max. 1.5 MPa, mini. 77 K) instead of liquid hydrogen. The experiments on a controllability of the system were carried out to investigate dynamic characteristics of the system. This report presents the experimental results and technical issues for the construction of a practical liquid-hydrogen moderator system of the Mega-Watt scale target system. (author)

  18. Characteristic of the immunological state of Chernobyl accident clean-up workers in a late period after the accident

    International Nuclear Information System (INIS)

    Kurjane, N.; Zvagule, T.; Curbakova, E.; Bruvere, R.; Romanova, T.; Sitova, O; Hagina, E.; Socnevs, A.

    2001-01-01

    No differences in the number of immunologically competent cells and other immunological variables were found among the clean-up workers, depending on the time they were in Chernobyl. However, a statistically significant reduction in the number of CD3+, CD4+, CD16+ and CD19+, decrease in the levels of IgG and suppression of APH and the phagocytic activity of neutrophils with a simultaneous increase in the levels of IgA and C3d was found in all clean-up workers when compared to controls. In a small group of clean-up workers, the levels of some plasma cytokines were detected. A statistically significant increase in IL-6 levels was found in the clean-up workers when compared to controls. The irradiation received by the Chernobyl accident clean-up workers was large enough to cause disturbances in the function of cells and organ systems through immune system disorders with a resultant weakening of the body response and adaptation mechanisms. (authors)

  19. Magnetic fusion energy plasma interactive and high heat flux components. Volume II. Technical assessment of the critical issues and problem areas in high heat flux materials and component development

    International Nuclear Information System (INIS)

    Abdou, M.A.; Boyd, R.D.; Easor, J.R.

    1984-06-01

    A technical assessment of the critical issues and problem areas for high heat flux materials and components (HHFMC) in magnetic fusion devices shows these problems to be of critical importance for the successful operation of near-term fusion experiments and for the feasibility and attractiveness of long-term fusion reactors. A number of subgroups were formed to assess the critical HHFMC issues along the following major lines: (1) source conditions, (2) systems integration, (3) materials and processes, (4) thermal hydraulics, (5) thermomechanical response, (6) electromagnetic response, (7) instrumentation and control, and (8) test facilities. The details of the technical assessment are presented in eight chapters. The primary technical issues and needs for each area are highlighted

  20. Magnetic fusion energy plasma interactive and high heat flux components. Volume II. Technical assessment of the critical issues and problem areas in high heat flux materials and component development

    Energy Technology Data Exchange (ETDEWEB)

    Abdou, M.A.; Boyd, R.D.; Easor, J.R.; Gauster, W.B.; Gordon, J.D.; Mattas, R.F.; Morgan, G.D.; Ulrickson, M.A,; Watson, R.D.; Wolfer, W.G,

    1984-06-01

    A technical assessment of the critical issues and problem areas for high heat flux materials and components (HHFMC) in magnetic fusion devices shows these problems to be of critical importance for the successful operation of near-term fusion experiments and for the feasibility and attractiveness of long-term fusion reactors. A number of subgroups were formed to assess the critical HHFMC issues along the following major lines: (1) source conditions, (2) systems integration, (3) materials and processes, (4) thermal hydraulics, (5) thermomechanical response, (6) electromagnetic response, (7) instrumentation and control, and (8) test facilities. The details of the technical assessment are presented in eight chapters. The primary technical issues and needs for each area are highlighted.

  1. HANFORD SITE RIVER CORRIDOR CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.

    2006-01-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km 2 Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal

  2. Critical technical issues and evaluation and comparison studies for inertial fusion energy reactors

    Energy Technology Data Exchange (ETDEWEB)

    Abdou, M.A. (Mechanical, Aerospace and Nuclear Engineering Dept., Univ. of California, Los Angeles, CA (United States)); Ying, A.Y. (Mechanical, Aerospace and Nuclear Engineering Dept., Univ. of California, Los Angeles, CA (United States)); Tillack, M.S. (Mechanical, Aerospace and Nuclear Engineering Dept., Univ. of California, Los Angeles, CA (United States)); Ghoniem, N.M. (Mechanical, Aerospace and Nuclear Engineering Dept., Univ. of California, Los Angeles, CA (United States)); Waganer, L.M. (McDonnell Douglas Aerospace, St. Louis, MI (United States)); Driemeyer, D.E. (McDonnell Douglas Aerospace, St. Louis, MI (United States)); Linford, G.J. (TRW Space and Electronics Div., Redondo Beach, CA (United States)); Drake, D.J.

    1994-01-01

    Two inertial fusion energy (IFE) reactor design concepts developed in the Prometheus studies were evaluated. Objectives were to identify and characterize critical issues and the R and D required to resolve them, and to establish a sound basis for future IFE technical and programmatic decisions. Each critical issue contains several key physics and engineering issues associated with major reactor components and impacts key aspects of feasibility, safety, and economic potential of IFE reactors. Generic critical issues center around: demonstration of moderate gain at low driver energy, feasibility of direct drive targets, feasibility of indirect drive targets for heavy ions, feasibility of indirect drive targets for lasers, cost reduction strategies for heavy ion drivers, demonstration of higher overall laser driver efficiency, tritium self-sufficiency in IFE reactors, cavity clearing at IFE pulse repetition rates, performance/reliability/lifetime of final laser optics, viability of liquid metal film for first wall protection, fabricability/reliability/lifetime of SiC composite structures, validation of radiation shielding requirements, design tools, and nuclear data, reliability and lifetime of laser and heavy ion drivers, demonstration of large-scale non-linear optical laser driver architecture, demonstration of cost effective KrF amplifiers, and demonstration of low cost, high volume target production techniques. Quantitative evaluation and comparison of the two design options have been made with special focus on physics feasibility, engineering feasibility, economics, safety and environment, and research and development (R and D) requirements. Two key conclusions are made based on the overall evaluation analysis. The heavy-ion driven reactors appear to have an overall advantage over laser-driven reactors.

  3. Cleanup of a jet fuel spill

    Science.gov (United States)

    Fesko, Steve

    1996-11-01

    Eaton operates a corporate aircraft hanger facility in Battle Creek, Michigan. Tests showed that two underground storage tanks leaked. Investigation confirmed this release discharged several hundred gallons of Jet A kerosene into the soil and groundwater. The oil moved downward approximately 30 feet and spread laterally onto the water table. Test results showed kerosene in the adsorbed, free and dissolved states. Eaton researched and investigated three clean-up options. They included pump and treat, dig and haul and bioremediation. Jet fuel is composed of readily biodegradable hydrocarbon chains. This fact coupled with the depth to groundwater and geologic setting made bioremediation the low cost and most effective alternative. A recovery well was installed at the leading edge of the dissolved contamination. A pump moved water from this well into a nutrient addition system. Nutrients added included nitrogen, phosphorous and potassium. Additionally, air was sparged into the water. The water was discharged into an infiltration gallery installed when the underground storage tanks were removed. Water circulated between the pump and the infiltration basin in a closed loop fashion. This oxygenated, nutrient rich water actively and aggressively treated the soils between the bottom of the gallery and the top of the groundwater and the groundwater. The system began operating in August of 1993 and reduced jet fuel to below detection levels. In August of 1995 The State of Michigan issued a clean closure declaration to the site.

  4. Technical issues in fusion reactors

    International Nuclear Information System (INIS)

    Rohatgi, V.K.; Vijayan, T.

    1989-01-01

    In this paper the issues in fusion reactor technology are examined. Rapid progress in fusion technology research in recent years can be attributed to the advances in various technologies. The commercial generation of fusion power greatly depends on the evolution and improvements in these technologies. With better understanding of plasma physics, fusion reactor designs are becoming more and more realistic and comprehensive. It is now possible to compare various concepts within the framework of established technologies. The technological issues needing better understanding and solutions to problem areas are identified. Various instabilities and energy losses are major problem areas. Extensive developments in reactor-relevant advanced materials, compact and powerful superconducting magnets, high-power systems, and plasma heating drivers need to be undertaken and emphasized

  5. Superfund at work: Hazardous waste cleanup efforts nationwide, spring 1993 (Radium Chemical Site profile, Queens, New York)

    International Nuclear Information System (INIS)

    1993-01-01

    The Radium Chemical hazardous waste site in Queens, New York was contaminated with radium, posing a grave potential threat to the community. The US Environmental Protection Agency (EPA) used the Superfund program to design a long-term cleanup for the site using input from citizens and the business community. Superfund staff: Mobilized a quick cleanup action to remove 10,000 small containers of radium; Developed a streamlined approach to long-term cleanup; Secured the site to reduce the possibility of radiation exposure to the local residents; Cooperated with the community to design a well-organized emergency response plan; and Educated local citizens about site hazards, incorporating community concerns into the cleanup process. The Radium Chemical site is a clear example of EPA's effective management and problem-solving strategies at Superfund sites

  6. EBR-II Cover Gas Cleanup System upgrade process control system structure

    International Nuclear Information System (INIS)

    Carlson, R.B.; Staffon, J.D.

    1992-01-01

    The Experimental Breeder Reactor II (EBR-II) Cover Gas Cleanup System (CGCS) control system was upgraded in 1991 to improve control and provide a graphical operator interface. The upgrade consisted of a main control computer, a distributed control computer, a front end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper briefly describes the Cover Gas Cleanup System and the overall control system; describes the main control computer hardware and system software features in more detail; and, then, describes the real-time control tasks, and how they interact with each other, and how they interact with the operator interface task

  7. Technical issues and a prospect of ICAI. Chiteki CAI no gijutsu kadai to kongo no doko

    Energy Technology Data Exchange (ETDEWEB)

    Otsuki, S. (Kyushu Institute of Technology, Kitakyushu (Japan))

    1992-12-10

    This paper explains technical issues and a prospect for intelligent computer assisted instruction (ICAI) which combines the intelligent tutoring system (ITS) with an open-ended (discovery) type education system. The paper summarizes the ITS characterized by modelling students based on error-origin diagnostic technologies; various functions that have been realized for the first time therefrom; different methods for error diagnosis and error-origin diagnosis; and criteria to evaluate these methods (evaluating generality, coverage, and tractability). The paper indicates that no complete diagnostic methods have been obtained according to these criteria, that, therefore, an issue of incompleteness in the student model still remains, and that unsolved issues in the ITS include some that exceed the framework of the ITS. Also mentioned in the paper are that the discovery type education system has a possibility of realizing an education with new quality, and that a new attempt is being performed to merge the ITS with the discovery type education system. 17 refs., 2 figs.

  8. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site

    International Nuclear Information System (INIS)

    Gonzales, D.

    1993-12-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing site are summarized as follows: In accordance with EPA-promulgated land cleanup standards, in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100m 2 grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 clean up protocol has been developed. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR Part 192 relative to supplemental standards

  9. Illustrating Environmental Issues by Using the Production-Possibility Frontier: A Classroom Experiment

    Science.gov (United States)

    Carson, Nancy; Tsigaris, Panagiotis

    2011-01-01

    The authors develop a new classroom experimental game to illustrate environmental issues by using the production-possibility frontier in an introductory economics course. Waste evolves as a byproduct of the production of widgets. Environmental cleanup is produced by reallocating scarce resources away from the production of the dirty good. In…

  10. Volume overload cleanup: An approach for on-line SPE-GC, GPC-GC, and GPC-SPE-GC

    NARCIS (Netherlands)

    Kerkdijk, H.; Mol, H.G.J.; Nagel, B. van der

    2007-01-01

    A new concept for cleanup, based on volume overloading of the cleanup column, has been developed for on-line coupling of gel permeation chromatography (GPC), solid-phase extraction (SPE), or both, to gas chromatography (GC). The principle is outlined and the applicability demonstrated by the

  11. Uranium Mill Tailings Remedial Action Project: technical approach document

    International Nuclear Information System (INIS)

    1986-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978, PL95-604, grants the Secretary of Energy authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards from inactive uranium mill sites. These cleanup actions are to be performed in compliance with the EPA standards (40 CFR Part 192) which became final on March 7, 1983. This document describes the general technical approaches and design criteria that are adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPA standards

  12. Aligning Career and Technical Education

    Science.gov (United States)

    Workman, Ed; Stubbs, Joyce

    2011-01-01

    The issues and concerns facing Kentucky Career and Technical Teacher Education (KY CTTE), university teacher educators and state department Career and Technical Education (CTE) leaders in providing and preparing the best CTE teachers possible are not unique to Kentucky. In an effort to better understand these issues and concerns a team of state…

  13. Fernald restoration: ecologists and engineers integrate restoration and cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Woods, Eric; Homer, John

    2002-07-15

    As cleanup workers excavate pits and tear down buildings at the Fernald site in southwest Ohio, site ecologists are working side-by-side to create thriving wetlands and develop the early stages of forest, prairie, and savanna ecosystems to restore natural resources that were impacted by years of site operations. In 1998, the U.S. Department of Energy-Fernald Office (DOE-FN) and its cleanup contractor, Fluor Fernald, Inc., initiated several ecological restoration projects in perimeter areas of the site (e.g., areas not used for or impacted by uranium processing or waste management). The projects are part of Fernald's final land use plan to restore natural resources over 904 acres of the 1,050-acre site. Pete Yerace, the DOE-FN Natural Resource Trustee representative is working with the Fernald Natural Resource Trustees in an oversight role to resolve the state of Ohio's 1986 claim against DOE for injuries to natural resources. Fluor Fernald, Inc., and DOE-FN developed the ''Natural Resource Restoration Plan'', which outlines 15 major restoration projects for the site and will restore injured natural resources at the site. In general, Fernald's plan includes grading to maximize the formation of wetlands or expanded floodplain, amending soil where topsoil has been removed during excavation, and establishing native vegetation throughout the site. Today, with cleanup over 35 percent complete and site closure targeted for 2006, Fernald is entering a new phase of restoration that involves heavily remediated areas. By working closely with engineers and cleanup crews, site ecologists can take advantage of remediation fieldwork (e.g., convert an excavated depression into a wetland) and avoid unnecessary costs and duplication. This collaboration has also created opportunities for relatively simple and inexpensive restoration of areas that were discovered during ongoing remediation. To ensure the survival of the plant material in heavily

  14. A Numerical Study of Factors Affecting Fracture-Fluid Cleanup and Produced Gas/Water in Marcellus Shale: Part II

    Energy Technology Data Exchange (ETDEWEB)

    Seales, Maxian B.; Dilmore, Robert; Ertekin, Turgay; Wang, John Yilin

    2017-04-01

    Horizontal wells combined with successful multi-stage hydraulic fracture treatments are currently the most established method for effectively stimulating and enabling economic development of gas bearing organic-rich shale formations. Fracture cleanup in the Stimulated Reservoir Volume (SRV) is critical to stimulation effectiveness and long-term well performance. However, fluid cleanup is often hampered by formation damage, and post-fracture well performance frequently falls below expectations. A systematic study of the factors that hinder fracture fluid cleanup in shale formations can help optimize fracture treatments and better quantify long term volumes of produced water and gas. Fracture fluid cleanup is a complex process influenced by multi-phase flow through porous media (relative permeability hysteresis, capillary pressure etc.), reservoir rock and fluid properties, fracture fluid properties, proppant placement, fracture treatment parameters, and subsequent flowback and field operations. Changing SRV and fracture conductivity as production progresses further adds to the complexity of this problem. Numerical simulation is the best, and most practical approach to investigate such a complicated blend of mechanisms, parameters, their interactions, and subsequent impact on fracture fluid cleanup and well deliverability. In this paper, a 3-dimensional, 2-phase, dual-porosity model was used to investigate the impact of multiphase flow, proppant crushing, proppant diagenesis, shut-in time, reservoir rock compaction, gas slippage, and gas desorption on fracture fluid cleanup, and well performance in Marcellus shale. The research findings have shed light on the factors that substantially constrains efficient fracture fluid cleanup in gas shales, and provided guidelines for improved fracture treatment designs and water management.

  15. Technical Proposal Salton Sea Geothermal Power Pilot Plant Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1975-03-28

    The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in which developmental geothermal utilization concepts can be tested and evaluated. Program efforts will be divided into four sub-programs; Power Generation, Mineral Extraction, Reservoir Production, and the Area Resources Test Facility. The Power Generation Subprogram will include testing of scale and corrosion control methods, and critical power cycle components; power cycle selection based on an optimization of technical, environmental and economic analyses of candidate cycles; preliminary design of a pilot geothermal-electric generating station to be constructed in Phase 2 of this program. The Mineral Extraction Subprogram will involve the following: selection of an optimum mineral recovery process; recommendation of a brine clean-up process for well injection enhancement; engineering, construction and operation of mineral recovery and brine clean-up facilities; analysis of facility operating results from environmental, economical and technical point-of-view; preliminary design of mineral recovery and brine clean-up facilities of sufficient size to match the planned pilot power plant. The Reservoir Production Subprogram will include monitoring the operation and maintenance of brine production, handling and injection systems which were built with private funding in phase 0, and monitoring of the brine characteristics and potential subsidence effects during well production and injection. Based on the above, recommendations and specifications will be prepared for production and

  16. Postclosure risks at the proposed Yucca Mountain repository: A review of methodological and technical issues

    International Nuclear Information System (INIS)

    Emel, J.; Kasperson, R.E.; Goble, R.; Renn, O.

    1988-06-01

    Accordingly, the first section of the report provides an overview and critique of the risk analysis methodology proposed by the US Department of Energy (DOE 1988) in the Draft Site Characterization Plan (SCP) and related documents. The second section addresses specific technical problems associated with the site. Each section considers the significance or implications of the issues for the successful long-term isolation of radioactive wastes from the biosphere. We conclude with overall observations on the adequacy of current understandings and approaches in the waste disposal program and implications for the State of Nevada

  17. Dosimetric monitoring at time of Chernobyl clean-up. A retrospective view

    International Nuclear Information System (INIS)

    Chumak, V.V.; Bakhanova, E.V.; Musijachenko, N.V.; Krjuchkov, V.P.

    2000-01-01

    Although at time of the accident many thousands of individuals were subjected to personal dosimetric monitoring, a status of dosimetric support of clean-up activities performed in 1986-1987 remains one of the most uncertain radiological issues related to Chernobyl accident. It is known that the scope, practical coverage and methodologies of dosimetry at time of the accident significantly varied. Unfortunately, the dose records available now in a number registries and databases are lacking direct indications of the methods of dosimetry, locations of work and tasks performed by liquidators. Moreover, data record linkage in many cases is problematic due to lack of unique identifiers in the databases of concern. However, this information, collected in course of dosimetric monitoring is extremely valuable for epidemiological consideration of this cohort and, therefore, cannot be neglected because of problems with strait forward application of this data. Retrospective consideration of dosimetric monitoring data was conducted along several lines. First, data sets (in some cases impersonal), related to the known dosimetric practices were studied in order to determine regularities in their dose distributions, evaluate possible distortions caused by extraneous admixtures to dose arrays and evaluate possible contribution of falsified dose records. Another effort was directed towards individualization of information regarding affiliation and tasks of the liquidators included into the State Chernobyl Registry (SCR), which is, essentially, the main pool of subjects for observation in the framework of post Chernobyl epidemiological studies. The SCR in its original shape was missing this crucial information. In order to recover this information gap, a wide scale postal survey of liquidators was undertaken. Those persons who are included into the State Chernobyl Registry and have official dose records were asked to respond to a simple five-entry questionnaire, dealing with their

  18. Enewetak fact book (a resume of pre-cleanup information)

    International Nuclear Information System (INIS)

    Bliss, W.

    1982-09-01

    The book contains a group of short treatises on the precleanup condition of the islands in Enewetak Atoll. Their purpose was to provide brief guidance to the radiological history and radiological condition of the islands for use in cleanup of the atoll

  19. Distributed generation - SHPP - Small hydroelectric power plants: technical and environmental issues; Geracao distribuida - PCH'S: aspectos tecnicos e ambientais

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Moacyr Trindade de Oliveira [Comissao de Servicos Publicos de Energia do Estado de Sao Paulo (CSPE), SP (Brazil)]. E-mail: mtandrade@sp.gov.br

    2004-07-01

    The Brazilian electrical system is presenting significant changes in its organizational structure in order to adapt to the new government's policies, market characteristics and the need for expansion of generation systems (supply), transmission and distribution (transport), and commercialization (demand) of energy. The previous structure propitiated the absolute control of the Union in the introduction of new plants, searching for a prioritization to their unit cost of energy, used as an 'Index of Merit' and expressed by U.S. $ / MWh, with planning costs increasing extent. This alternative did not address the environmental issues, referring only those technical aspects and costs of implementation. The socio-environmental issues were relegated to second plan. The significant interest of manufacturers prioritized the {sup b}ig construction{sup ,} as the simultaneous achievement of several big constructions enabling the consolidation of a constant flow of resources and sedimentary longevity of the situation. This paper aims to discuss and present the benefits of distributed generation electric power, with features to complement the offer, but with benefits for micro-regions in which they are deployed, based on technical, economic and socio environmental issues. (author)

  20. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

  1. Aviation safely management, Valdez oil spill clean-up

    International Nuclear Information System (INIS)

    Friesenhahn, M.J.; McKeown, W.L.; Williams, R.G.

    1993-01-01

    The March 24, 1989 Exxon Valdez oil spill in Alaska's Prince William Sound (PWS) resulted in an unprecedented mobilization of personnel and oil spill clean-up equipment. This paper describes the comprehensive safety management system implemented for aviation operations supporting the clean-up response in PWS and the Gulf of Alaska (GOA). Aviation support operations quickly expanded to over 100 aircraft obtained from numerous sources. Beginning with early surveillance flights, aviation operations were subject to comprehensive safety management programs, including safety assessments, minimum flight weather criteria, operational standards and procedures, air carrier qualifications, equipment and procedure audits, and emergency response. Communication networks and flight following procedures were established, arctic survival training was conducted, and a full complement of survival equipment was required. These programs were largely responsible for safety performance of the spill response effort-during the 1989-92 response activities, over 56,000 flight hours, 159,000 equivalent passengers, and 20,000 tons of cargo were handled without an aviation related injury. The programs are applicable to offshore development and operational activities, particularly those located in more remote, severe environments

  2. Evaluation of water-hammer experience in nuclear power plants. Technical findings relevant to Unresolved Safety Issue A-1

    International Nuclear Information System (INIS)

    Serkiz, A.W.

    1983-05-01

    This report summarizes key technical findings relevant to the Unresolved Safety Issue A-1, Water Hammer. These findings were derived from studies of reported water hammer occurrences and underlying causes and provide key insights into means to minimize or eliminate further water hammer occurrences. It should also be noted that this report does not represent a substitute for current rules and regulations

  3. Evaluation of water hammer occurrence in nuclear power plants: technical findings relevant to unresolved safety issue A-1

    International Nuclear Information System (INIS)

    1984-03-01

    This report, which includes responses to public comments, summarizes key technical findings relevant to the Unresolved Safety Issue A-1, Water Hammer. These findings were derived from studies of reported water hammer occurrences and underlying causes and provide key insights into means to minimize or eliminate further water hammer occurrences. This report does not represent a substitute for current rules and regulations

  4. Accelerated solvent extraction method with one-step clean-up for hydrocarbons in soil

    International Nuclear Information System (INIS)

    Nurul Huda Mamat Ghani; Norashikin Sain; Rozita Osman; Zuraidah Abdullah Munir

    2007-01-01

    The application of accelerated solvent extraction (ASE) using hexane combined with neutral silica gel and sulfuric acid/ silica gel (SA/ SG) to remove impurities prior to analysis by gas chromatograph with flame ionization detector (GC-FID) was studied. The efficiency of extraction was evaluated based on the three hydrocarbons; dodecane, tetradecane and pentadecane spiked to soil sample. The effect of ASE operating conditions (extraction temperature, extraction pressure, static time) was evaluated and the optimized condition obtained from the study was extraction temperature of 160 degree Celsius, extraction pressure of 2000 psi with 5 minutes static extraction time. The developed ASE with one-step clean-up method was applied in the extraction of hydrocarbons from spiked soil and the amount extracted was comparable to ASE extraction without clean-up step with the advantage of obtaining cleaner extract with reduced interferences. Therefore in the developed method, extraction and clean-up for hydrocarbons in soil can be achieved rapidly and efficiently with reduced solvent usage. (author)

  5. Combining innovative technology demonstrations with dense nonaqueous phase liquids cleanup

    International Nuclear Information System (INIS)

    Hagood, M.C.; Koegler, K.J.; Rohay, V.J.; Trent, S.J.; Stein, S.L.; Brouns, T.M.; McCabe, G.H.; Tomich, S.

    1993-05-01

    Radioactively contaminated acidic aqueous wastes and organic liquids were discharged to the soil column at three disposal sites within the 200 West Area of the Hanford Site, Washington. As a result, a portion of the underlying groundwater is contaminated with carbon tetrachloride several orders of magnitude above the maximum contaminant level accepted for a drinking water supply. Treatability testing and cleanup actions have been initiated to remove the contamination from both the unsaturated soils to minimize further groundwater contamination and the groundwater itself. To expedite cleanup, innovative technologies for (1) drilling, (2) site characterization, (3) monitoring, (4) well field development, and (5) contaminant treatment are being demonstrated and subsequently used where possible to improve the rates and cost savings associated with the removal of carbon tetrachloride from the soils and groundwater

  6. Funding Site Cleanup at Closing Army Installations: A Stochastic Optimization Approach

    National Research Council Canada - National Science Library

    Ardic, Sureyya

    2001-01-01

    ...) to help determine how to allocate limited yearly funding to installations for environmental cleanup, Considering environmental policies and yearly installation funding requests from 2002 to 2015...

  7. PROGRESS & CHALLENGES IN CLEANUP OF HANFORDS TANK WASTES

    Energy Technology Data Exchange (ETDEWEB)

    HEWITT, W.M.; SCHEPENS, R.

    2006-01-23

    The River Protection Project (RPP), which is managed by the Department of Energy (DOE) Office of River Protection (ORP), is highly complex from technical, regulatory, legal, political, and logistical perspectives and is the largest ongoing environmental cleanup project in the world. Over the past three years, ORP has made significant advances in its planning and execution of the cleanup of the Hartford tank wastes. The 149 single-shell tanks (SSTs), 28 double-shell tanks (DSTs), and 60 miscellaneous underground storage tanks (MUSTs) at Hanford contain approximately 200,000 m{sup 3} (53 million gallons) of mixed radioactive wastes, some of which dates back to the first days of the Manhattan Project. The plan for treating and disposing of the waste stored in large underground tanks is to: (1) retrieve the waste, (2) treat the waste to separate it into high-level (sludge) and low-activity (supernatant) fractions, (3) remove key radionuclides (e.g., Cs-137, Sr-90, actinides) from the low-activity fraction to the maximum extent technically and economically practical, (4) immobilize both the high-level and low-activity waste fractions by vitrification, (5) interim store the high-level waste fraction for ultimate disposal off-site at the federal HLW repository, (6) dispose the low-activity fraction on-site in the Integrated Disposal Facility (IDF), and (7) close the waste management areas consisting of tanks, ancillary equipment, soils, and facilities. Design and construction of the Waste Treatment and Immobilization Plant (WTP), the cornerstone of the RPP, has progressed substantially despite challenges arising from new seismic information for the WTP site. We have looked closely at the waste and aligned our treatment and disposal approaches with the waste characteristics. For example, approximately 11,000 m{sup 3} (2-3 million gallons) of metal sludges in twenty tanks were not created during spent nuclear fuel reprocessing and have low fission product concentrations. We

  8. Selection of a new nuclear unit for Slovakia: possibilities and key technical issues

    International Nuclear Information System (INIS)

    Misak, J.

    2009-01-01

    Plans for construction of new nuclear unit at Jaslovske Bohunice brings forward the issue of selection of reactor design. This paper compares technical characteristics (safety and operational) of pressurized water reactors that are at present available in the market, such as AP 1000 (WEC), EPR (AREVA), AES 2006 (ASE), APWR 1700 (Mitsubishi) and APR 1400 (Korea Hydro and Nuclear). Selected parameters that require close attention in future negotiations with potential suppliers are discussed in detail. Compared are parameters as type of the reactor, reactor output power, quantified level of safety, compliance with national legislature and international safety requirements, operational flexibility in meeting requirements of the grid, using of verified technology, measures for coping with severe accidents, resistance against extreme external conditions etc. (authors)

  9. Improving Sampling, Analysis, and Data Management for Site Investigation and Cleanup

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA) supports the adoption of streamlined approaches to sampling, analysis, and data management activities conducted during site assessment, characterization, and cleanup.

  10. A simple cleanup method for the isolation of nitrate from natural water samples for O isotopes analysis

    International Nuclear Information System (INIS)

    Haberhauer, G.; Blochberger, K.

    1999-09-01

    The analysis of O-isotopic composition of nitrate has many potential applications in studies of environmental processes. O-isotope nitrate analysis require sample free of other oxygen-containing compounds. More than 100 % of non-NO 3 - oxygen relative to NO 3 - oxygen can still be found in forest soil water samples after cleanup if improper cleanup strategies, e.g., adsorption onto activated carbon, are used. Such non-NO 3 - oxygen compounds will bias O-isotropic data. Therefore, an efficient cleanup method was developed to isolate nitrate from natural water samples. In a multistep cleanup procedure using adsorption onto water-insoluble poly(vinylpyrrolidone), removal of almost all other oxygen-containing compounds, such as fulvic acids, and isolation of nitrate was achieved. The method supplied samples free of non-NO 3 - oxygen which can be directly combusted to CO 2 for subsequent O-isotope analysis. (author)

  11. 40 CFR 761.125 - Requirements for PCB spill cleanup.

    Science.gov (United States)

    2010-07-01

    ... greater which are subject to decontamination requirements under TSCA, including those spills listed under... required. (2) Disposal of cleanup debris and materials. All concentrated soils, solvents, rags, and other... than 1 pound of PCBs by weight (less than 270 gallons of untested mineral oil)—(1) Decontamination...

  12. Cleanup Verification Package for the 300 VTS Waste Site

    International Nuclear Information System (INIS)

    Clark, S.W.; Mitchell, T.H.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 300 Area Vitrification Test Site, also known as the 300 VTS site. The site was used by Pacific Northwest National Laboratory as a field demonstration site for in situ vitrification of soils containing simulated waste

  13. Cleanup Verification Package for the 300 VTS Waste Site

    Energy Technology Data Exchange (ETDEWEB)

    S. W. Clark and T. H. Mitchell

    2006-03-13

    This cleanup verification package documents completion of remedial action for the 300 Area Vitrification Test Site, also known as the 300 VTS site. The site was used by Pacific Northwest National Laboratory as a field demonstration site for in situ vitrification of soils containing simulated waste.

  14. Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update

    Energy Technology Data Exchange (ETDEWEB)

    L. V. Street

    2007-04-01

    The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility.

  15. Evolution of the Business Environment Surrounding the UK's Nuclear Site Cleanup Program

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Lees, P.M.; Wall, C.E.E.

    2006-01-01

    In April 2005 twenty civil nuclear sites in the United Kingdom became the responsibility of the Nuclear Decommissioning Authority (NDA), a new organization created by the British Government to manage the cleanup of these sites. As a key part of this transition, the NDA became the owner and manager of these sites, which formerly were owned by the site operators, British Nuclear Fuels Limited plc (BNFL) and the United Kingdom Atomic Energy Authority (UKAEA). This was one of the most significant events in the history of the United Kingdom's nuclear industry and represented a true sea change, affecting many aspects of life and business on and around these sites as well as nationally. The NDA's budget for the cleanup of the twenty sites and the management of the overall cleanup program is approximately pounds 2 Billion per annum, almost $4 Billion. It is important to note that approximately half of this amount is spent with the supply chains which serve the management and operations contractors, including pounds 500 million at Sellafield alone. Additionally, the site management and operations contractors receive most of the pounds 2 Billion through contracts between the NDA and the various site management companies. This represents a lot of government money moving through contracts between entities, which invokes procurement and contracting rules and regulations, that while not new, have not previously been this broadly applied to nuclear site cleanup activities throughout the UK. The current estimate for the total life cycle cleanup costs for all twenty civil nuclear sites is pounds 56 Billion, a figure that is likely to increase further. The first rules to mention are the European Union Procurement Guidelines, which are designed to help ensure that procurements involving government funds are conducted in an open, fair, and transparent environment. While it is difficult to argue with the intent of these rules, at least for now they are having a slowing down effect on

  16. An exercise on clean-up actions in an urban environment after a nuclear accident. Report of the NKS EKO 4 programme

    International Nuclear Information System (INIS)

    French, S.; Haemaelaeinen, R.; Naadland, E.; Roed, J.; Salo, A.; Sinkko, K.

    1996-03-01

    The EKO 4/c working group of the environmental effects and emergency preparedness programme (EKO) of the Nordic Nuclear Safety Research (NKS) organised a decision conference on August 30th and 31st, 1995 in Stockholm, Sweden. The meeting was designed to be attended by those responsible for planning and deciding on protective actions in the Nordic countries after a nuclear accident. Issues concerning clean-up strategies in an urban environment after a hypothetical and very severe reactor accident were discussed at the meeting. The objectives of the meeting were to provide a shared understanding between the decision makers and the radiation protection community on concerns and issues related to decision on protective actions after a nuclear accident. (6 refs., 2 figs., 3 tabs.)

  17. An exercise on clean-up actions in an urban environment after a nuclear accident. Report of the NKS EKO 4 programme

    Energy Technology Data Exchange (ETDEWEB)

    French, S. [ed.] [Leeds Univ. (United Kingdom). School of Computer Studies; Finck, R. [ed.] [Swedish Radiation Protection Inst., Stockholm (Sweden); Haemaelaeinen, R. [ed.] [Helsinki Univ. of Technology, Espoo (Finland); Naadland, E. [ed.] [Norwegian Radiation Protection Authority, Oesteraas (Norway); Roed, J. [ed.] [Risoe National Lab., Roskilde (Denmark); Salo, A. [ed.] [Helsinki (Finland); Sinkko, K. [ed.] [Finnish Centre for Radiation and Nuclear Safety, Helsinki (Finland)

    1996-03-01

    The EKO 4/c working group of the environmental effects and emergency preparedness programme (EKO) of the Nordic Nuclear Safety Research (NKS) organised a decision conference on August 30th and 31st, 1995 in Stockholm, Sweden. The meeting was designed to be attended by those responsible for planning and deciding on protective actions in the Nordic countries after a nuclear accident. Issues concerning clean-up strategies in an urban environment after a hypothetical and very severe reactor accident were discussed at the meeting. The objectives of the meeting were to provide a shared understanding between the decision makers and the radiation protection community on concerns and issues related to decision on protective actions after a nuclear accident. (6 refs., 2 figs., 3 tabs.).

  18. Technical and perceptual issues on head-related transfer functions sets for use in binaural synthesis

    DEFF Research Database (Denmark)

    Toledo, Daniela

    of binaural synthesis in providing a realistic and/or convincing virtual sonic experience relies largely on technical and perceptual issues inherent to the HRTFs and their use, particularly on how well the spectral features of the HRTFs used match those of the listener. This PhD thesis focused on identifying...... the spectral features that cue sound localization in the mid-sagittal plane. Listening tests were conducted from which groups of individual and non-individual HRTFs that evoked the same direction were obtained. Analysis of these HRTFs suggested that the relevant spectral cues covered a broad range...

  19. Biomass Gasification - A synthesis of technical barriers and current research issues for deployment at large scale

    Energy Technology Data Exchange (ETDEWEB)

    Heyne, Stefan [Chalmers Univ. of Technology, Gothenburg (Sweden); Liliedahl, Truls [KTH, Royal Inst. of Technology, Stockholm (Sweden); Marklund, Magnus [Energy Technology Centre, Piteaa (Sweden)

    2013-09-01

    Thermal gasification at large scale for cogeneration of power and heat and/or production of fuels and materials is a main pathway for a sustainable deployment of biomass resources. However, so far no such full scale production exists and biomass gasification projects remain at the pilot or demonstration scale. This report focuses on the key critical technology challenges for the large-scale deployment of the following biomass-based gasification concepts: Direct Fluidized Bed Gasification (FBG), Entrained Flow Gasification (EFG) and indirect Dual Fluidized Bed Gasification (DFBG). The main content in this report is based on responses from a number of experts in biomass gasification obtained from a questionnaire. The survey was composed of a number of more or less specific questions on technical barriers as to the three gasification concepts considered. For formalising the questionnaire, the concept of Technology Readiness Level (TRL 1-9) was used for grading the level of technical maturity of the different sub-processes within the three generic biomass gasification technologies. For direct fluidized bed gasification (FBG) it is mentioned that the technology is already available at commercial scale as air-blown technology and thus that air-blown FBG gasification may be reckoned a mature technology. The remaining technical challenge is the conversion to operation on oxygen with the final goal of producing chemicals or transport fuels. Tar reduction, in particular, and gas cleaning and upgrading in general are by far the most frequently named technical issues considered problematic. Other important aspects are problems that may occur when operating on low-grade fuels - i.e. low-cost fuels. These problems include bed agglomeration/ash sintering as well as alkali fouling. Even the preparation and feeding of these low-grade fuels tend to be problematic and require further development to be used on a commercial scale. Furthermore, efficient char conversion is mentioned by

  20. How public issues shape environmental restoration plans - experiences with Colorado UMTRA projects

    International Nuclear Information System (INIS)

    Hunt, B.; Monaghan, J.

    1991-01-01

    Federal environmental restoration plans are being significantly impacted by open-quotes grassrootsclose quotes public pressure and by community demands, some of which have little relation to the technical standards of remediation and which go well beyond authorizing legislation. These demands often represent significant additional project costs. A review of Uranium Mill Tailings Remedial Action (UMTRA) Program experiences in Colorado suggests that the more serious open-quotes grassrootsclose quotes issues associated with remediation rarely diminish and, in fact, will intensify over time. This presents program administrators with the dilemma of attempting to adhere to program mandates and keep projects within budget, while at the same time trying to be responsive to community concerns. Such high-profiled community debates have the ability to delay remediation and even jeopardize important projects. After prolonged public debate, when it becomes clear an issue will not dissipate, project officials may be forced to meet certain community demands. Often, this results in not only increased costs, but a loss of public confidence in clean-up efforts. Evidence also suggests, however, that when critical public issues can be identified and addressed before they become overly contentious, significant problems and controversy can be avoided; but, the situation is made difficult because project officials often lack the policy guidance to determine which, if any, community demands should be addressed and to what extent they should be met. The adoption of several key public policy principles by program administrators will provide a greater ability to address community demands in a timely and successful manner

  1. Fuel cleanup system for the tritium systems test assembly: design and experiments

    International Nuclear Information System (INIS)

    Kerr, E.C.; Bartlit, J.R.; Sherman, R.H.

    1980-01-01

    A major subsystem of the Tritium Systems Test Assembly is the Fuel Cleanup System (FCU) whose functons are to: (1) remove impurities in the form of argon and tritiated methane, water, and ammonia from the reactor exhaust stream and (2) recover tritium for reuse from the tritiated impurities. To do this, a hybrid cleanup system has been designed which utilizes and will test concurrently two differing technologies - one based on disposable, hot metal (U and Ti) getter beds and a second based on regenerable cryogenic asdorption beds followed by catalytic oxidation of impurities to DTO and stackable gases and freezout of the resultant DTO to recover essentially all tritium for reuse

  2. Technical issues of reduced activation ferritic/martensitic steels for fabrication of ITER test blanket modules

    International Nuclear Information System (INIS)

    Tanigawa, H.; Hirose, T.; Shiba, K.; Kasada, R.; Wakai, E.; Serizawa, H.; Kawahito, Y.; Jitsukawa, S.; Kimura, A.; Kohno, Y.; Kohyama, A.; Katayama, S.; Mori, H.; Nishimoto, K.; Klueh, R.L.; Sokolov, M.A.; Stoller, R.E.; Zinkle, S.J.

    2008-01-01

    Reduced activation ferritic/martensitic steels (RAFMs) are recognized as the primary candidate structural materials for fusion blanket systems. The RAFM F82H was developed in Japan with emphasis on high-temperature properties and weldability. Extensive irradiation studies have conducted on F82H, and it has the most extensive available database of irradiated and unirradiated properties of all RAFMs. The objective of this paper is to review the R and D status of F82H and to identify the key technical issues for the fabrication of an ITER test blanket module (TBM) suggested from the recent research achievements in Japan. This work clarified that the primary issues with F82H involve welding techniques and the mechanical properties of weld joints. This is the result of the distinctive nature of the joint caused by the phase transformation that occurs in the weld joint during cooling, and its impact on the design of a TBM will be discussed

  3. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  4. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  5. Green Remediation Best Management Practices: Integrating Renewable Energy into Site Cleanup

    Science.gov (United States)

    The U.S. Environmental Protection Agency (EPA) Principles for Greener Cleanups outline the Agency's policy for evaluating and minimizing the environmental 'footprint' of activities undertaken when cleaning up a contaminated site.

  6. Development of cleanup criteria for historic low-level radioactive waste sites in Canada

    International Nuclear Information System (INIS)

    Pollock, R.W.; Chambers, D.B.; Lowe, L.M.

    1995-01-01

    This paper will describe recent work performed to develop cleanup criteria, and their current status, for historic low-level radioactive waste sites in Canada. These historic wastes date back to 1933, when a radium refinery began operation in Port Hope, Ontario. The problem of residual wastes and contaminated buildings and soils in Port Hope, resulting from the practices in the early years of radium and uranium production, was discovered in the mid-1970s, and a large scale cleanup program carried out. This work was concentrated on developed properties. As a result, substantial quantities of contaminated materials remained in a number of large undeveloped areas. A number of additional historic waste sites have subsequently been discovered at other locations in Canada, where buildings and/or soils were contaminated with uranium ores or concentrates spilled during transport, or with processing residues, or as a result of the use of radium containing materials. There has been substantial evolution of the criteria for cleanup of these sites over the almost 20 year period since work started at the first sites

  7. Restoration principles and criteria: Superfund programme policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    Shapiro, M.

    2000-01-01

    The Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response is responsible for implementing two key US laws regulating waste management and cleanup: the Resource Conservation and Recovery Act, and the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed ''Superfund''. The purpose of the Superfund programme is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund programme. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in the identical way as chemical contamination. (author)

  8. Risk newsboy: approach for addressing uncertainty in developing action levels and cleanup limits

    International Nuclear Information System (INIS)

    Cooke, Roger; MacDonell, Margaret

    2007-01-01

    Site cleanup decisions involve developing action levels and residual limits for key contaminants, to assure health protection during the cleanup period and into the long term. Uncertainty is inherent in the toxicity information used to define these levels, based on incomplete scientific knowledge regarding dose-response relationships across various hazards and exposures at environmentally relevant levels. This problem can be addressed by applying principles used to manage uncertainty in operations research, as illustrated by the newsboy dilemma. Each day a newsboy must balance the risk of buying more papers than he can sell against the risk of not buying enough. Setting action levels and cleanup limits involves a similar concept of balancing and distributing risks and benefits in the face of uncertainty. The newsboy approach can be applied to develop health-based target concentrations for both radiological and chemical contaminants, with stakeholder input being crucial to assessing 'regret' levels. Associated tools include structured expert judgment elicitation to quantify uncertainty in the dose-response relationship, and mathematical techniques such as probabilistic inversion and iterative proportional fitting. (authors)

  9. Superfund: right-to-know and hazardous waste site cleanup. Hearing before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session, December 20, 1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    Representatives of local and state offices and the congressional representative of St. Paul, Minnesota testified at a field hearing on the Superfund program. The focus of the hearing was on community right-to-know aspects and the cleanup of hazardous materials that were abandoned on federal sites. At issue was environmental problems at the 38 priority sites listed for Minnesota and the lack of information on health effects after over 20 years of environmental study of toxic substances. The proposed legislation would subject federal facilities and sites to the same standards, cleanup schedules, and oversite as private sites. A new enforcement bill would encourage citizen suits to force cleanup. Military arsenals that contribute to water and soil pollution were of particular concern. Witnesses discussed the need for a national right-to-know law so that businesses would not be tempted to relocate to avoid Minnesota's environmental policy. The hearing record covers the testimony of seven witnesses.

  10. Enhancing aquifer cleanup with reinjection

    International Nuclear Information System (INIS)

    Isherwood, W.F.; Ziagos, J.; Rice, D. Jr.; Krauter, P.; Nichols, E.

    1992-09-01

    Injection of water or steam, with or without chemical surfactants, is a common petroleum industry technique to enhance product recovery. In the geothermal industry, reinjection (reinjection is used to mean the injection of ground water that was previously injected) of heat- depleted subsurface fluids is commonly used to maintain reservoir pressure, thus prolonging field productivity. The use reinjection in ground-water remediation projects allows for the application of both traditional production field management and a variety of additional enhancements to the cleanup process. Development of the ideas in this paper was stimulated by an initial suggestion by Dr. Jacob Bear (personal discussions, 1990--1991) that reinjected water might be heated to aid the desorption process

  11. Houdini: Site and locomotion analysis-driven design of an in-tank mobile cleanup robot

    International Nuclear Information System (INIS)

    Schempf, H.

    1995-10-01

    This paper describes design and locomotion analysis efforts to develop a new reconfigurable and collapsible working machine, dubbed Houdini, to remotely clean up hazardous-waste and petroleum storage tanks. The tethered robot system is designed to allow remote entry through man-way openings as small as 0.61 m in diameter, after which it expands its locomotors and opens up its collapsible backhoe/manipulator and plow to subsequently perform waste or material handling operations. The design is optimized to meet stringent site and safety requirements, and represents a viable alternative to (1) the long-reach manipulation systems proposed for hazardous storage tank cleanup, and (2) confined-entry manual cleanup approaches. The system development has been funded to provide waste mobilization and removal solutions for the hazardous waste storage tanks in the Department of Energy (DoE) Fernald and Oak Ridge complexes. Other potential applications areas are the cleanup of heavy-crude petroleum storage tanks. The author has developed a fully operational prototype which is currently undergoing testing

  12. Hebei Spirit Oil Spill Exposure and Subjective Symptoms in Residents Participating in Clean-Up Activities

    Science.gov (United States)

    Cheong, Hae-Kwan; Lee, Jong Seong; Kwon, Hojang; Ha, Eun-Hee; Hong, Yun-Chul; Choi, Yeyong; Jeong, Woo-Chul; Hur, Jongil; Lee, Seung-Min; Kim, Eun-Jung; Im, Hosub

    2011-01-01

    Objectives This study was conducted to examine the relationship between crude oil exposure and physical symptoms among residents participating in clean-up work associated with the Hebei Spirit oil spill, 2007 in Korea. Methods A total of 288 residents responded to a questionnaire regarding subjective physical symptoms, sociodemographic characteristics and clean-up activities that occurred between two and eight weeks after the accident. Additionally, the urine of 154 of the respondents was analyzed for metabolites of volatile organic compounds (VOCs) and polycyclic aromatic hydrocarbons (PAHs) and heavy metals. To compare the urinary levels of exposure biomarkers, the urine of 39 inland residents who were not directly exposed to the oil spill were analyzed. Results Residents exposed to oil remnants through clean-up work showed associations between physical symptoms and the exposure levels defined in various ways, including days of work, degree of skin contamination, and levels of some urinary exposure biomarkers of VOCs, metabolites and metals, although no major abnormalities in urinary exposure biomarkers were observed. Conclusions This study provides evidence of a relationship between crude oil exposure and acute human health effects and suggests the need for follow-up to evaluate the exposure status and long-term health effects of clean-up participants. PMID:22125768

  13. Reactor coolant cleanup device

    International Nuclear Information System (INIS)

    Igarashi, Noboru.

    1986-01-01

    Purpose: To enable to introduce reactor water at high temperature and high pressure as it is, as well as effectively adsorb to eliminate cobalt in reactor water. Constitution: The coolant cleanup device comprises a vessel main body inserted to coolant pipeway circuits in a water cooled reactor power plant and filters contained within the vessel main body. The filters are prepared by coating and baking powder of metal oxides such as manganese ferrite having a function capable of adsorbing cobalt in the coolants onto the surface of supports made of metals or ceramics resistant to strong acids and alkalies in the form of three-dimensional network structure, for example, zircaloy-2, SUS 303 and the zirconia (baking) to form a basic filter elements. The basic filter elements are charged in plurality to the vessel main body. (Kawaiami, Y.)

  14. 'Mini'-Roadmapping - Ensuring Timely Sites' Cleanup/Closure by Resolving Science and Technology Issues

    International Nuclear Information System (INIS)

    Luke, D.E.; Dixon, B.W.; Murphy, J.A.

    2003-01-01

    Roadmapping is a powerful tool to manage technical risks and opportunities associated with complex problems. Roadmapping identifies technical capabilities required for both project- and program-level efforts and provides the basis for plans that ensure the necessary enabling activities will be done when needed. Roadmapping reveals where to focus further development of the path forward by evaluating uncertainties for levels of complexity, impacts, and/or the potential for large payback. Roadmaps can be customized to the application, a ''graded approach'' if you will. Some roadmaps are less detailed. We have called these less detailed, top-level roadmaps ''mini-roadmaps''. These mini roadmaps are created to tie the needed enablers (e.g., technologies, decisions, etc.) to the functions. If it is found during the mini-roadmapping that areas of significant risk exist, then those can be roadmapped further to a lower level of detail. Otherwise, the mini-roadmap may be sufficient to manage the project/program risk. Applying a graded approach to the roadmapping can help keep the costs down. Experience has indicated that it is best to do mini-roadmapping first and then evaluate the risky areas to determine whether to further evaluate those areas. Roadmapping can be especially useful for programs/projects that have participants from multiple sites, programs, or other entities which are involved. Increased synergy, better communications, and increased cooperation are the results from roadmapping a program/project with these conditions

  15. Technical Issues Associated With the Use of Intermediate Ethanol Blends (>E10) in the U.S. Legacy Fleet

    Energy Technology Data Exchange (ETDEWEB)

    Rich, Bechtold [Alliance Technical Services; Thomas, John F [ORNL; Huff, Shean P [ORNL; Szybist, James P [ORNL; West, Brian H [ORNL; Theiss, Timothy J [ORNL; Timbario, Tom [Alliance Technical Services; Goodman, Marc [Alliance Technical Services

    2007-08-01

    The Oak Ridge National Laboratory (ORNL) supports the U.S. Department of Energy (DOE) in assessing the impact of using intermediate ethanol blends (E10 to E30) in the legacy fleet of vehicles in the U.S. fleet. The purpose of this report is to: (1) identify the issues associated with intermediate ethanol blends with an emphasis on the end-use or vehicle impacts of increased ethanol levels; (2) assess the likely severity of the issues and whether they will become more severe with higher ethanol blend levels, or identify where the issue is most severe; (3) identify where gaps in knowledge exist and what might be required to fill those knowledge gaps; and (4) compile a current and complete bibliography of key references on intermediate ethanol blends. This effort is chiefly a critical review and assessment of available studies. Subject matter experts (authors and selected expert contacts) were consulted to help with interpretation and assessment. The scope of this report is limited to technical issues. Additional issues associated with consumer, vehicle manufacturer, and regulatory acceptance of ethanol blends greater than E10 are not considered. The key findings from this study are given.

  16. Hebei Spirit Oil Spill Exposure and Subjective Symptoms in Residents Participating in Clean-Up Activities

    OpenAIRE

    Cheong, Hae-Kwan; Ha, Mina; Lee, Jong Seong; Kwon, Hojang; Ha, Eun-Hee; Hong, Yun-Chul; Choi, Yeyong; Jeong, Woo-Chul; Hur, Jongil; Lee, Seung-Min; Kim, Eun-Jung; Im, Hosub

    2011-01-01

    Objectives This study was conducted to examine the relationship between crude oil exposure and physical symptoms among residents participating in clean-up work associated with the Hebei Spirit oil spill, 2007 in Korea. Methods A total of 288 residents responded to a questionnaire regarding subjective physical symptoms, sociodemographic characteristics and clean-up activities that occurred between two and eight weeks after the accident. Additionally, the urine of 154 of the respondents was ana...

  17. Modeling emissions and dispersion of contaminants from cleanup activities at a mixed waste site to estimate air impacts and risks

    International Nuclear Information System (INIS)

    Chang, Y.S.; Menlove, S.

    1993-09-01

    The transport and dispersion of contaminants via the air pathway is a major concern during cleanup of contaminated sites. Impacts to air quality and human health during cleanup were evaluated for the Weldon Spring site by using site-specific information for source areas, activities, and receptor locations. In order to ensure protection of human health and the environment, results are being used to focus on those cleanup activities for which release controls should be emphasized

  18. ''How clean is clean'' in the United States federal and Washington State cleanup regulations

    International Nuclear Information System (INIS)

    Landau, H.G.

    1993-01-01

    The enactment of legislation and promulgation of implementing regulations generally involves the resolution of conflicting goals. Defining ''How Clean is Clean?'' in federal and state cleanup laws, regulations, and policies is no exception. Answering the ''How Clean is Clean?'' question has resulted in the identification of some important and sometimes conflicting goals. Continuing resolution of the following conflicting goals is the key to effect cleanup of hazardous waste sites: Expediency vs. Fairness; Flexibility vs. Consistency; Risk Reduction vs. Risk Causation; and Permanence vs. Cost Effectiveness

  19. A risk-based approach to cleanup: Problems and pitfalls

    International Nuclear Information System (INIS)

    Anspaugh, L.

    1995-10-01

    This paper details information dealing with the meetings of the International Council of Scientific Unions (ICSU). Topics discussed include: Radtest program to summarize all data on radiation doses resulting from nuclear weapons testing; current status of US cleanup strategies; development of new milestones for the project due to reduced budgets; health hazards; and risk reduction

  20. Solvent cleanup using base-treated silica gel solid adsorbent

    International Nuclear Information System (INIS)

    Tallent, O.K.; Mailen, J.C.; Pannell, K.D.

    1984-06-01

    A solvent cleanup method using silica gel columns treated with either sodium hydroxide (NaOH) or lithium hydroxide (LiOH) has been investigated. Its effectiveness compares favorably with that of traditional wash methods. After treatment with NaOH solution, the gels adsorb HNO 3 , dibutyl phosphate (DBP), UO 2 2+ , Pu 4+ , various metal-ion fission products, and other species from the solvent. Adsorption mechanisms include neutralization, hydrolysis, polymerization, and precipitation, depending on the species adsorbed. Sodium dibutyl phosphate, which partially distributes to the solvent from the gels, can be stripped with water; the stripping coefficient ranges from 280 to 540. Adsorption rates are diffusion controlled such that temperature effects are relatively small. Recycle of the gels is achieved either by an aqueous elution and recycle sequence or by a thermal treatment method, which may be preferable. Potential advantages of this solvent cleanup method are that (1) some operational problems are avoided and (2) the amount of NaNO 3 waste generated per metric ton of nuclear fuel reprocessed would be reduced significantly. 19 references, 6 figures, 12 tables

  1. A new direction for prioritizing federal agency cleanups

    International Nuclear Information System (INIS)

    McCrillis, L.

    1995-01-01

    Departments and agencies of the federal government manage a vast array of activities at 27,000 facilities. Due to the nature of such activities, federal facilities could be contaminated with hazardous substances. It is estimated that the federal government ultimately will be responsible for or have a significant role in the cleanup of up to 500,000 sites. Although federal facilities comprise only a small percentage of the community regulated under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), federal facilities owned or operated by the Department of Energy (DOE) and the Department of Defense (DOD) are usually larger and more complex than their private industrial counterparts. Federal facilities routinely have a larger number of sites on their facilities with varying degrees of risk. At present, the approaches for allocating resources for environmental restoration of federal facilities, for incorporating stakeholder concerns in the allocation, and for obtaining funding from Congress vary greatly from one agency to another. In light of these concerns, the federal government recognizes the need to evaluate the current resource allocation system for funding remediation projects and to establish a broader-based publicly supported priority-setting method. This paper outlines a possible new direction and summarizes the conclusions reached in a handful of forums created to address the issue of priority setting

  2. PROGRESS and CHALLENGES IN CLEANUP OF HANFORDS TANK WASTES

    International Nuclear Information System (INIS)

    HEWITT, W.M.; SCHEPENS, R.

    2006-01-01

    The River Protection Project (RPP), which is managed by the Department of Energy (DOE) Office of River Protection (ORP), is highly complex from technical, regulatory, legal, political, and logistical perspectives and is the largest ongoing environmental cleanup project in the world. Over the past three years, ORP has made significant advances in its planning and execution of the cleanup of the Hartford tank wastes. The 149 single-shell tanks (SSTs), 28 double-shell tanks (DSTs), and 60 miscellaneous underground storage tanks (MUSTs) at Hanford contain approximately 200,000 m 3 (53 million gallons) of mixed radioactive wastes, some of which dates back to the first days of the Manhattan Project. The plan for treating and disposing of the waste stored in large underground tanks is to: (1) retrieve the waste, (2) treat the waste to separate it into high-level (sludge) and low-activity (supernatant) fractions, (3) remove key radionuclides (e.g., Cs-137, Sr-90, actinides) from the low-activity fraction to the maximum extent technically and economically practical, (4) immobilize both the high-level and low-activity waste fractions by vitrification, (5) interim store the high-level waste fraction for ultimate disposal off-site at the federal HLW repository, (6) dispose the low-activity fraction on-site in the Integrated Disposal Facility (IDF), and (7) close the waste management areas consisting of tanks, ancillary equipment, soils, and facilities. Design and construction of the Waste Treatment and Immobilization Plant (WTP), the cornerstone of the RPP, has progressed substantially despite challenges arising from new seismic information for the WTP site. We have looked closely at the waste and aligned our treatment and disposal approaches with the waste characteristics. For example, approximately 11,000 m 3 (2-3 million gallons) of metal sludges in twenty tanks were not created during spent nuclear fuel reprocessing and have low fission product concentrations. We plan to

  3. Cleanup Verification Package for the 618-2 Burial Ground

    Energy Technology Data Exchange (ETDEWEB)

    W. S. Thompson

    2006-12-28

    This cleanup verification package documents completion of remedial action for the 618-2 Burial Ground, also referred to as Solid Waste Burial Ground No. 2; Burial Ground No. 2; 318-2; and Dry Waste Burial Site No. 2. This waste site was used primarily for the disposal of contaminated equipment, materials and laboratory waste from the 300 Area Facilities.

  4. Cleanup Verification Package for the 600-47 Waste Site

    International Nuclear Information System (INIS)

    Cutlip, M.J.

    2005-01-01

    This cleanup verification package documents completion of interim remedial action for the 600-47 waste site. This site consisted of several areas of surface debris and contamination near the banks of the Columbia River across from Johnson Island. Contaminated material identified in field surveys included four areas of soil, wood, nuts, bolts, and other metal debris

  5. Cleanup Verification Package for the 618-2 Burial Ground

    International Nuclear Information System (INIS)

    Thompson, W.S.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 618-2 Burial Ground, also referred to as Solid Waste Burial Ground No. 2; Burial Ground No. 2; 318-2; and Dry Waste Burial Site No. 2. This waste site was used primarily for the disposal of contaminated equipment, materials and laboratory waste from the 300 Area Facilities

  6. Fixed-bed gasifier and cleanup system engineering summary report through Test Run No. 100

    Energy Technology Data Exchange (ETDEWEB)

    Pater, K. Jr.; Headley, L.; Kovach, J.; Stopek, D.

    1984-06-01

    The state-of-the-art of high-pressure, fixed-bed gasification has been advanced by the many refinements developed over the last 5 years. A novel full-flow gas cleanup system has been installed and tested to clean coal-derived gases. This report summarizes the results of tests conducted on the gasifier and cleanup system from its inception through 1982. Selected process summary data are presented along with results from complementary programs in the areas of environmental research, process simulation, analytical methods development, and component testing. 20 references, 32 figures, 42 tables.

  7. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This reports reports the progress/efforts performed on six technical projects: 1. systematic assessment of the state of hazardous waste clean-up technologies; 2. site remediation technologies (SRT):drain- enhanced soil flushing for organic contaminants removal; 3. SRT: in situ bio-remediation of organic contaminants; 4. excavation systems for hazardous waste sites: dust control methods for in-situ nuclear waste handling; 5. chemical destruction of polychlorinated biphenyls; and 6. development of organic sensors: monolayer and multilayer self-assembled films for chemical sensors.

  8. Containment Emergency Sump Performance. Technical findings related to Unresolved Safety Issue A-43. Revision 1

    International Nuclear Information System (INIS)

    1985-10-01

    This report summarizes key technical findings related to Unresolved Safety Issue (USI) A-43, Containment Emergency Sump Performance. Both BWRs and PWRs are considered in this report. Emergency core cooling systems require a clean, reliable water source to maintain long-term recirculation following a loss-of-coolant accident (LOCA). PWRs rely on the containment emergency sump to provide such a water supply to residual heat removal pumps and containment spray pumps. BWRs rely on pump suction intakes in the suppression pool or wet well to provide water to residual heat removal and core spray systems. Thus, the technical findings in this report provide information on post-LOCA recirculation. These findings have been derived from extensive experimental studies, generic plant studies, and assessments of sumps used for long-term cooling. Results of hydraulic tests have shown that the potential for air ingestion is less severe than previously hypothesized. The effects of debris blockage on NPSH margin must be dealt with on a plant-specific basis. These findings have been used to develop revisions to Regulatory Guide 1.82 and Standard Review Plan Section 6.2.2 (NUREG-0800)

  9. Technical and Vocational Education for Zimbabwe's Rural ...

    African Journals Online (AJOL)

    The main purpose of this paper is to highlight some issues and concerns in the Zimbabwean educational system in general, and in particular, issues and concerns within the purview for technical and vocational education. The paper will further provoke debate within the context of technical and vocational education as a ...

  10. Analysis of concentrating PV-T systems for the commercial/industrial sector. Volume III. Technical issues and design guidance

    Energy Technology Data Exchange (ETDEWEB)

    Schwinkendorf, W.E.

    1984-09-01

    This report provide appropriate guidance for addressing the major technical issues associated with the design and installation of a photovoltaic-thermal (PV-T) system. Nomographs are presented for developing preliminary sizing and costing, and issues associated with specific components and the overall design of the electrical and mechanical system are discussed. SAND82-7157/2 presents a review of current PV-T technology and operating systems and a study of potential PV-T applications. Detailed PV-T system designs for three selected applications and the results of a trade-off study for these applications are presented in SAND82-7157/4. A summary of the major results of this entire study and conclusions concerning PV-T systems and applications is presented in SAND82-7157/1.

  11. Issues in Data Labelling

    NARCIS (Netherlands)

    Cowie, Roddy; Cox, Cate; Martin, Jeam-Claude; Batliner, Anton; Heylen, Dirk K.J.; Karpouzis, Kostas; Cowie, Roddy; Pelachaud, Catherine; Petta, Paolo

    2011-01-01

    Labelling emotion databases is not a purely technical matter. It is bound up with theoretical issues. Different issues affect labelling of emotional content, labelling of the signs that convey emotion, and labelling of the relevant context. Linked to these are representational issues, involving time

  12. The nuclear controversy-what are the issues

    International Nuclear Information System (INIS)

    Wyatt, A.

    1976-01-01

    The various issues raised by anti-nuclear groups are outlined and rebutted. Issues are grouped under four headingss - Economic; Technical; Social/Ethical/Moral; Political. Issues debated under economic aspects include conservation, unemployment resulting from energy use, use of alternative enrgy sources, high capital cost of nuclear power, high energy consumption in construction of plants, performance unreliability, depletion of uranium and excessive cost of decommissioning. Technically related issues, reactor safety, possibility of nuclear power plant explosion, waste managment, toxicity of plutonium, emission of radioactive material, thermal pollution and environmental effect of heavy water production are also discussed. Social/ethical/moral issues rebutted include radiation effects on health and genetic effects, deaths among uranium miners, morality of long-term waste storage, lack of faith in technical solutions and technical people, opposition to current life style, secrecy of information, nuclear proliferation and unsuitability of nuclear technology to the needs of developing countries. Political issues discussed are sabotage/terrorism possibilites, police state tactics in protection of nuclear facilities, misuse of technolgy by society, high energy society is capitalist and low energy society is Marxist, centralization of power, need for a great nuclear debate and the question of who pays for safety. Scientists and technical people are called upon to debate in their areas of specialty and are cautioned to be aware of tactics involved in meeting challengers head-on. (J.T.A.)

  13. Clean-up of the sea bed in the North Sea 1996

    International Nuclear Information System (INIS)

    1997-01-01

    The petroleum activities in the North Sea have inadvertently caused some conflict with fishermen getting their trawls etc. into trash from littering of the sea bed. In the present report, the Norwegian Petroleum Directorate describes a clean-up operation undertaken in 1996 and paid by the State. A clean-up area of 1000 km 2 off Karmoey was selected. This area was mapped by side scan sonar along survey lines 300 m equidistant and a sonar range of 200 m. The sonar data were continuously interpreted by a geophysicist. Selected targets were then identified by ROV and eventually removed. Of the 59 targets examined, 11 were removed and dumped onshore. The largest part elevated was a chain cable of 9 tons. There is also a brief discussion of the compensation agreement with Norwegian fishermen. 4 figs

  14. Predictors of employer satisfaction: technical and non-technical skills.

    Science.gov (United States)

    Danielson, Jared A; Wu, Tsui-Feng; Fales-Williams, Amanda J; Kirk, Ryan A; Preast, Vanessa A

    2012-01-01

    Employers of 2007-2009 graduates from Iowa State University College of Veterinary Medicine were asked to respond to a survey regarding their overall satisfaction with their new employees as well as their new employees' preparation in several technical and non-technical skill areas. Seventy-five responses contained complete data and were used in the analysis. Four technical skill areas (data collection, data interpretation, planning, and taking action) and five non-technical skill areas (interpersonal skills, ability to deal with legal issues, business skills, making referrals, and problem solving) were identified. All of the skill area subscales listed above had appropriate reliability (Cronbach's alpha>0.70) and were positively and significantly correlated with overall employer satisfaction. Results of two simultaneous regression analyses indicated that of the four technical skill areas, taking action is the most salient predictor of employer satisfaction. Of the five non-technical skill areas, interpersonal skills, business skills, making referrals, and problem solving were the most important skills in predicting employer satisfaction. Hierarchical regression analysis revealed that all technical skills explained 25% of the variation in employer satisfaction; non-technical skills explained an additional 42% of the variation in employer satisfaction.

  15. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Howe, Gary [RTI International, Research Triangle Park, NC (United States); Albritton, John [RTI International, Research Triangle Park, NC (United States); Denton, David [RTI International, Research Triangle Park, NC (United States); Turk, Brian [RTI International, Research Triangle Park, NC (United States); Gupta, Raghubir [RTI International, Research Triangle Park, NC (United States)

    2018-01-31

    technology has great potential to provide clean syngas from coal and petcoke-based gasification at increased efficiency and at significantly lower capital and operating costs than conventional syngas cleanup technologies. However, before the technology can be deemed ready for scale-up to a full commercial-scale demonstration, additional R&D testing is needed at the site to address the following critical technical risks: WDP sorbent stability and performance; Impact of WDP on downstream cleanup and conversion steps; Metallurgy and refractory; Syngas cleanup performance and controllability; Carbon capture performance and additional syngas cleanup The proposed plan to acquire this additional R&D data involves: Operation of the units to achieve an additional 3,000 hours of operation of the system within the performance period, with a target of achieving 1,000 hours of those hours via continuous operation of the entire integrated pre-commercial demonstration system; Rapid turnaround of repairs and/or modifications required as necessary to return any specific unit to operating status with documentation and lessons learned to support technology maturation, and; Proactive performance of maintenance activities during any unplanned outages and if possible while operating.

  16. The Use of Ascorbic Acid as a Food Additive: Technical-Legal Issues

    Science.gov (United States)

    Varvara, Michele; Bozzo, Giancarlo; Celano, Giuseppe; Disanto, Chiara; Pagliarone, Cosimo Nicola

    2016-01-01

    Ascorbic acid (C6H8O6) is an organic compound belonging to the family of monosaccharide. It is highly soluble in water, and is often called one of the secrets of the Mediterranean diet. Its use is widespread in the food industry is also important, having always been exploited for its antioxidant and stabilising ability. Many indeed are the additive formulations that take advantage of these properties. The purpose of this paper is to explain the characteristics that make ascorbic acid an important food additive and to emphasise the technical and legal issues related to its use in food productions. In particular, in the course of this employment, laws and scientific studies have been applied to the resolution of a lawsuit, having as its object the use of ascorbic acid in preparations of ground beef sold at a butcher shop. The views expressed in court by the technical consultant have led to the acquittal of the accused, in the light of the demonstrated and proven non-toxicity of the molecule and the use of a mixture of additives for the production of sausage. The European and national legislations, supported by numerous scientific studies, define the possible use of ascorbic acid according to the principle of quantum satis, and it can be used in foods for children. Our work aims to represent further evidence of the safety of use of ascorbic acid as a food additive, and – as confirmed by the legal decision reported – it wants to bring out the prospects for use of ascorbic acid for technological purposes even by registered establishments. PMID:27800425

  17. Technical and Vocational Education in Nigeria: Issues, Challenges and a Way Forward

    Science.gov (United States)

    Okoye, Reko; Arimonu, Maxwell Onyenwe

    2016-01-01

    Technical education, as enshrined in the Nigerian national policy on education, is concerned with qualitative technological human resources development directed towards a national pool of skilled and self reliant craftsmen, technicians and technologists in technical and vocational education fields. In Nigeria, the training of technical personnel…

  18. NRC's rulemaking to require materials licensees to be financially responsible for cleanup of accidental releases

    International Nuclear Information System (INIS)

    Seeman, M.J.

    1987-01-01

    On June 7, 1985, the US Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking (ANPRM) in the Federal Register to address funding for cleanup of accidents and unexpected decontamination by certain materials licensees. The NRC asked for public comment to help them determine whether to amend its regulations to require certain materials and fuel cycle licensees to demonstrate that they possess adequate financial means to pay for cleanup of accidental releases of radioactive materials. If licensees lack adequate financial resources and funds are to available for prompt cleanup, the consequences could be potentially significant for the public, the licencee and the federal government. The purpose of this paper is to explain the purpose and scope of the Commission's proposed regulatory action, as well as describing several accidents that made the Commission consider this action. Additionally, the paper will address other regulatory precedents. Finally, the paper will conclude by generally characterizing the public comments and items of concern raised by commenters

  19. Effectiveness of clean-up procedures on stain susceptibility of different orthodontic adhesives

    Directory of Open Access Journals (Sweden)

    Swati Pundlik Mane

    2014-01-01

    Conclusion: Chemical-cure adhesive showed higher stain susceptibility than light-cure adhesive in all clean-up procedures. Both adhesives would show less stain susceptibility with polishing step with rubber cup and pumice.

  20. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    International Nuclear Information System (INIS)

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  1. Towards technical interoperability in telemedicine.

    Energy Technology Data Exchange (ETDEWEB)

    Craft, Richard Layne, II

    2004-05-01

    For telemedicine to realize the vision of anywhere, anytime access to care, the question of how to create a fully interoperable technical infrastructure must be addressed. After briefly discussing how 'technical interoperability' compares with other types of interoperability being addressed in the telemedicine community today, this paper describes reasons for pursuing technical interoperability, presents a proposed framework for realizing technical interoperability, identifies key issues that will need to be addressed if technical interoperability is to be achieved, and suggests a course of action that the telemedicine community might follow to accomplish this goal.

  2. Health complaints among subjects involved in oil cleanup operations during oil spillage from a Greek tanker "Tasman Spirit".

    Science.gov (United States)

    Meo, Sultan Ayoub; Al-Drees, Abdul Majeed; Rasheed, Shahzad; Meo, Imran Mu; Al-Saadi, Muslim M; Ghani, Hamza A; Alkandari, Jasem Ramadan

    2009-01-01

    Oil spillage in the sea water is a disaster for marine life and humans in the vicinity. The study aimed at investigating health complaints among subjects involved in oil cleanup operations during a spillage from a Greek oil tanker "Tasman Spirit". The project was conducted under the supervision of the Department of Physiology, College of Medicine, King Khalid University Hospital, King Saud University, Riyadh, Saudi Arabia. The study concerned the respiratory and general health complaints in 50 apparently healthy, non-smoking male workers exposed to crude oil during oil cleanup operations. The exposed group was matched with a similar number of male, non-smoking controls. The health complaints were evaluated based on a comprehensive interview. The subjects involved in oil cleanup operations had significantly higher rates of health complaints including cough (38%), runny nose (36%), eye irritation/redness (32%), sore throat (28%), headache (28%), nausea (24%) and general illness (18%), compared to their matched controls. Air pollution due to crude oil spillage into sea water may cause respiratory and general health complaints in workers involved in oil cleanup operations.

  3. Radioactive waste spill and cleanup on storage tank at the Savannah River Plant

    International Nuclear Information System (INIS)

    Boore, W.G.; McNatt, F.G.; Ryland, R.K.; Scaggs, R.A.; Strother, E.D.; Wilson, R.W.

    1986-03-01

    This report was prepared for historical purpose to document events associated with a radioactive spill and subsequent cleanup efforts at the Savannah River Plant. On December 29, 1983, approximately 100 gallons of liquid radioactive waste, containing an estimated 200-600 curies of cesium-137, leaked from a flushwater line onto the top of the Savannah River Plant's Tank 13 in H-area. The highest measured radiation rate was 100 R/hr at 12 inches from the evaporator feed pump riser. The leak was caused by a series of events involving inadequate heat tracing on a flushwater line, failure of a gasket in 7 0 F weather, failure of personnel to follow a procedure, and leakage across a gate valve seat. Some of the leaked solution migrated into storm water ditches during rain, and a total of 237 millicuries migrated to a nearby stream over several months. However, no significant increase in the cesium-137 concentration occurred in the Savannah River or in the groundwater under the impacted area. Cleanup, costing 3.7 million dollars, took place over the following eighteen months. Cleanup involved water flushing, chemical flushing and mechanical removal of a portion of the concrete tank-top surface, followed by excavation of 1383 cubic yards of soil surrounding the tank. Stringent and effective radiological controls, including development of remote decontamination methods, allowed the cleanup to be accomplished with a total radiation dose to personnel of 58 rems. New safeguards were built into the system to protect against spills and to provide greater assurance of spill containment. Lead sheeting and a 4- to 6-inch-thick concrete overpour were bonded over the remaining contaminated concrete to reduce the radiation levels to less than 20 mR/hr at 3 feet. The Tank 13 evaporator feed system resumed operation in June 1985. 3 refs., 42 figs., 2 tabs

  4. Investigation and feasibility study of a former manufactured gas plant site in Tuttlingen (Germany), based on individually determined clean-up criteria

    Energy Technology Data Exchange (ETDEWEB)

    Heinecker, C.; Pickel, H.-J.; Duffek, J. [HPC Harress Pickel Consult GmbH, Fuldatal (Germany)

    1995-12-31

    At the request of the former plant operator, a manufactured gas plant site in Tuttlingen, Germany, was investigated from 1988 through 1992 for subsurface soil contamination resulting from former activities. In 1991, the contents of the former tar pits and parts of the adjacent soil contaminations were removed in the course of clean-up activities by means of excavation and disposed at a special waste site. Following an initial risk assessment, a remedial investigation was carried out in order to further delineate the contaminated areas as well as to create a reliable database for a feasibility study of remedial alternatives. The feasibility study followed applicable Baden-Wurttemberg state guidelines, including the following elements: Determination of the clean-up goals for soils; pre-selection of the clean-up procedure; cost estimate; cost-effectiveness study; Non-monetary evaluation; and total evaluation/clean-up proposal. The following general alternatives were available for the definition of clean-up goals: background values (`H-values`); general guidelines values (`SZ-values`); and clean-up goals based on contaminant fate and transport as well as site use (`SZA-values`).

  5. Eliciting Public Attitudes Regarding Bioremediation Cleanup Technologies: Lessons Learned from a Consensus Workshop in Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Denise Lach, Principle Investigator; Stephanie Sanford, Co-P.I.

    2003-03-01

    During the summer of 2002, we developed and implemented a ''consensus workshop'' with Idaho citizens to elicit their concerns and issues regarding the use of bioremediation as a cleanup technology for radioactive nuclides and heavy metals at Department of Energy (DOE) sites. The consensus workshop is a derivation of a technology assessment method designed to ensure dialogue between experts and lay people. It has its origins in the United States in the form of ''consensus development conferences'' used by the National Institutes of Health (NIH) to elicit professional knowledge and concerns about new medical treatments. Over the last 25 years, NIH has conducted over 100 consensus development conferences. (Jorgensen 1995). The consensus conference is grounded in the idea that technology assessment and policy needs to be socially negotiated among many different stakeholders and groups rather than narrowly defined by a group of experts. To successfully implement new technology, the public requires access to information that addresses a full complement of issues including understanding the organization proposing the technology. The consensus conference method creates an informed dialogue, making technology understandable to the general public and sets it within perspectives and priorities that may differ radically from those of the expert community. While specific outcomes differ depending on the overall context of a conference, one expected outcome is that citizen panel members develop greater knowledge of the technology during the conference process and, sometimes, the entire panel experiences a change in attitude toward the technology and/or the organization proposing its use (Kluver 1995). The purpose of this research project was to explore the efficacy of the consensus conference model as a way to elicit the input of the general public about bioremediation of radionuclides and heavy metals at Department of Energy sites

  6. Eliciting Public Attitudes Regarding Bioremediation Cleanup Technologies: Lessons Learned from a Consensus Workshop in Idaho

    International Nuclear Information System (INIS)

    Denise Lach, Principle Investigator; Stephanie Sanford, Co-P.I.

    2003-01-01

    During the summer of 2002, we developed and implemented a ''consensus workshop'' with Idaho citizens to elicit their concerns and issues regarding the use of bioremediation as a cleanup technology for radioactive nuclides and heavy metals at Department of Energy (DOE) sites. The consensus workshop is a derivation of a technology assessment method designed to ensure dialogue between experts and lay people. It has its origins in the United States in the form of ''consensus development conferences'' used by the National Institutes of Health (NIH) to elicit professional knowledge and concerns about new medical treatments. Over the last 25 years, NIH has conducted over 100 consensus development conferences. (Jorgensen 1995). The consensus conference is grounded in the idea that technology assessment and policy needs to be socially negotiated among many different stakeholders and groups rather than narrowly defined by a group of experts. To successfully implement new technology, the public requires access to information that addresses a full complement of issues including understanding the organization proposing the technology. The consensus conference method creates an informed dialogue, making technology understandable to the general public and sets it within perspectives and priorities that may differ radically from those of the expert community. While specific outcomes differ depending on the overall context of a conference, one expected outcome is that citizen panel members develop greater knowledge of the technology during the conference process and, sometimes, the entire panel experiences a change in attitude toward the technology and/or the organization proposing its use (Kluver 1995). The purpose of this research project was to explore the efficacy of the consensus conference model as a way to elicit the input of the general public about bioremediation of radionuclides and heavy metals at Department of Energy sites. Objectives of the research included: (1

  7. Reactor water clean-up device

    International Nuclear Information System (INIS)

    Sawa, Toshio; Takahashi, Sankichi; Takashima, Yoshie.

    1983-01-01

    Purpose: To efficiently eliminate radioactive materials such as iron oxide and cobalt ions with less heat loss by the use of an electrode assembly applied with a direct current. Constitution: In a reactor water clean-up device adapted to pass reactor water through an electrode assembly comprising at least a pair of anode and cathode applied with a direct current to eliminate various types of ions contained in the reactor water by way of the electrolysis or charge neutralization at the anode, the cathode is constituted with a corrosion resistant grid-like or porous metal plate and a layer to the upper portion of the metal plate filled with a plurality of metal spheres of about 1 - 5 mm diameter, and the anode is made of insoluble porous or spirally wound metal material. (Seki, T.)

  8. Hanford Site Cleanup Challenges and Opportunities for Science and Technology--A Strategic Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Thomas W.; Johnson, Wayne L.; Kreid, Dennis K.; Walton, Terry L.

    2001-02-01

    The sheer expanse of the Hanford Site, the inherent hazards associated with the significant inventory of nuclear materials and wastes, the large number of aging contaminated facilities, the diverse nature and extent of environmental contamination, and the proximity to the Columbia River make Hanford perhaps the world's largest and most complex environmental cleanup project. It is not possible to address the more complex elements of this enormous challenge in a cost-effective manner without strategic investments in science and technology. Success requires vigorous and sustained efforts to enhance the science and technology basis, develop and deploy innovative solutions, and provide firm scientific bases to support site cleanup and closure decisions at Hanford.

  9. Hanford Site Cleanup Challenges and Opportunities for Science and Technology--A Strategic Assessment

    International Nuclear Information System (INIS)

    Wood, Thomas W.; Johnson, Wayne L.; Kreid, Dennis K.; Walton, Terry L.

    2001-01-01

    The sheer expanse of the Hanford Site, the inherent hazards associated with the significant inventory of nuclear materials and wastes, the large number of aging contaminated facilities, the diverse nature and extent of environmental contamination, and the proximity to the Columbia River make Hanford perhaps the world's largest and most complex environmental cleanup project. It is not possible to address the more complex elements of this enormous challenge in a cost-effective manner without strategic investments in science and technology. Success requires vigorous and sustained efforts to enhance the science and technology basis, develop and deploy innovative solutions, and provide firm scientific bases to support site cleanup and closure decisions at Hanford

  10. Latvian Chernobyl clean-up workers dynamics of morbidity 15 years of the post radiation period

    International Nuclear Information System (INIS)

    Zvagule, T.; Eglite, M.; Bruvere, R.; Gabruseva, N.; Feldmane, G.

    2003-01-01

    Nearly 1.0% of the male population of Latvia were sent (1986-1991) to Chernobyl to assist in the clean-up activities after the nuclear power plant accident (1986). The prevalence of all types of diseases, dynamic of breaking out of the key symptoms and interferon status were evaluated in respect to date of work, duration of work and kind of work in the whole clean-up workers group and in the particular group with seizures of unconsciousness. The disease incidence in clean-up workers from Latvia exceeds that observed in age and sex matched male population. Most had several diseases each and their poly-symptomatic sicknesses exhibited tendency to progress even 10-14 years after the exposure (during 1996-2000). Diseases of nervous, digestive and circulatory system, mental disorders and diseases of muscles and connective tissue were the most frequent. The primary outset of symptoms being low in the first 2-3 years after the work gradually increased during the following 10 years. Leukopenia was predominant in 1990-1993 and leucocytosis in 1997-2000. Ability of leukocytes to produce interferons was significantly decreased. Since the external radiation doses did not exceed 50 centyGy (cGy) there is sufficient reasons to believe that the principal cause of the gradually increased frequency of health problems is the long-life radioisotopes incorporated in the clean-up workers bodies as permanent radiation and toxic compounds source. (authors)

  11. Regulatory and institutional issues for development of remedial action strategies at ORNL

    International Nuclear Information System (INIS)

    Kocher, D.C.

    1988-01-01

    This paper discusses a number of unresolved regulatory and institutional issues of fundamental importance to the development of strategies for cleanup of sites contaminated by the radioactive materials at Oak Ridge National Laboratory. These issues include the development of criteria for limiting radiation exposures of the public from remedial action sites, the time period to be assumed for active institutional controls over contaminated sites and the location at which such controls will be maintained, and the applicability of current standards for radioactivity in drinking water to surface waters and ground waters on the Oak Ridge Reservation. Proposals for resolution of these issues emphasize the need to protect public health, but in a cost-effective manner. 21 refs

  12. Technical Elements (CCT1)

    DEFF Research Database (Denmark)

    Thomsen, Kirsten Engelund; Wittchen, Kim Bjarne

    2017-01-01

    Many of the aspects dealt with in the CA EPBD are closely interlinked with each other and may refer to both new and existing buildings, as well as to inspection and certification. This is also true for technical aspects, such as the calculation methodologies, and how to include technical systems......’ efficiency or how to integrate renewable energy within them. The central team for Technical Elements deals with issues of a technical nature, which are common to new and existing buildings, and/or with minimum demands, certification and inspection. This report focuses on the implementation of Articles 3, 4...

  13. Three technical issues in fatigue damage assessment of nuclear power plant components

    International Nuclear Information System (INIS)

    Ware, A.G.; Shah, V.N.

    1991-01-01

    This paper addresses three technical issues that affect the fatigue damage assessment of nuclear power plant components: the effect of the environment on the fatigue life, the importance of the loading sequence in calculating the fatigue crack-initiation damage, and the adequacy of current inservice inspection requirements and methods to characterize fatigue cracks. The environmental parameters that affect the fatigue life of carbon and low alloy steel components are the sulphur content in the steel, the temperature, the amount of dissolved oxygen in the coolant, and the presence of oxidizing agents such as copper oxide. The occurrence of large-amplitude stress cycles early in a component's life followed by low-amplitude stress cycles may cause crack initiation at a cumulative usage factor less than 1.0. The current inservice inspection requirements include volumetric inspections of welds but not of some susceptible sites in the base metal. In addition, the conventional ultrasonic testing techniques need to be improved for reliable detection and accurate sizing of fatigue cracks. 28 refs., 4 figs., 1 tab

  14. The Estonian study of Chernobyl cleanup workers: II. Incidence of cancer and mortality

    International Nuclear Information System (INIS)

    Rahu, M.; Tekkel, M.; Veidebaum, T.

    1997-01-01

    A cohort of 4,472 men from Estonia who had participated in the cleanup activities in the Chernobyl area sometime between 1986 and 1991 and were followed through 1993 was analyzed with respect to the incidence of cancer and mortality. Incidence and mortality in the cleanup workers were assessed relative to national rates. No increases were found in all cancers (25 incident cases compared to 26.5 expected) or in leukemia (no cases observed, 1.0 expected). Incidence did not differ statistically significantly from expectation for any individual cancer site or type, though lung cancer and non-Hodgkin's lymphoma both occurred slightly more often than expected. A total of 144 deaths were observed [standardized mortality ratio (SMR) = 0.98; 95% confidence interval (CI) = 0.82-1.14] during an average of 6.5 years of follow-up. Twenty-eight deaths (19.4%) were suicides (SMR = 1.52; 95% CI = 1.01-2.19). Exposure to ionizing radiation while at Chernobyl has not caused a detectable increase in the incidence of cancer among cleanup workers from Estonia. At least for the short follow-up period, diseases directly attributable to radiation appear to be of relatively minor importance when compared with the substantial excess of deaths due to suicide. 28 refs., 3 tabs

  15. Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site: Final

    International Nuclear Information System (INIS)

    1994-01-01

    Thorium 230 (Th-230) at the Gunnison, Colorado processing site will require remediation, however, a seasonally fluctuating groundwater table at the site significantly complicates conventional remedial action with respect to cleanup. Therefore, to effectively remediate the site with respect to Radium 226 (Ra-226) and Th-230, the following supplemental standard is proposed: In situ Ra-26 will be remediated to the EPA soil cleanup standards independent of groundwater considerations. In situ Th-230 concentrations will be remediated in the region above the encountered water table so the 1000-year projected Ra-226 concentration complies with the EPA soil cleanup concentration limits. If elevated Th-230 persists to the water table, an additional foot of excavation will be performed and the grid will be backfilled. Excavated grids will be backfilled to the final remedial action grade with clean cobbly soil. Final grid verification that is required below the water table will be performed by extracting and analyzing a single bulk soil sample with the bucket of a backhoe. Modeled surface radon flux values will be estimated and documented. A recommendation will be made that land records should be annotated to identify the presence of residual Th-230

  16. Research and Development Issues for Interactive Electronic Technical Manuals

    National Research Council Canada - National Science Library

    Ricci, Katrina

    2002-01-01

    ... technologies to support Interactive Electronic Technical Manuals (IETMs). A workshop was conducted at the NAVAIR Orlando, Training Systems Division to discuss the domain and to present current research in this area...

  17. EBR-II Cover Gas Cleanup System upgrade distributed control and front end computer systems

    International Nuclear Information System (INIS)

    Carlson, R.B.

    1992-01-01

    The Experimental Breeder Reactor II (EBR-II) Cover Gas Cleanup System (CGCS) control system was upgraded in 1991 to improve control and provide a graphical operator interface. The upgrade consisted of a main control computer, a distributed control computer, a front end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper briefly describes the Cover Gas Cleanup System and the overall control system; gives reasons behind the computer system structure; and then gives a detailed description of the distributed control computer, the front end computer, and how these computers interact with the main control computer. The descriptions cover both hardware and software

  18. High Temperature Syngas Cleanup Technology Scale-up and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Gardner, Ben [Research Triangle Inst. (RTI), Research Triangle Park, NC (United States); Turk, Brian [Research Triangle Inst. (RTI), Research Triangle Park, NC (United States); Denton, David [Research Triangle Inst. (RTI), Research Triangle Park, NC (United States); Gupta, Raghubir [Research Triangle Inst. (RTI), Research Triangle Park, NC (United States)

    2015-09-30

    Gasification is a technology for clean energy conversion of diverse feedstocks into a wide variety of useful products such as chemicals, fertilizers, fuels, electric power, and hydrogen. Existing technologies can be employed to clean the syngas from gasification processes to meet the demands of such applications, but they are expensive to build and operate and consume a significant fraction of overall parasitic energy requirements, thus lowering overall process efficiency. RTI International has developed a warm syngas desulfurization process (WDP) utilizing a transport-bed reactor design and a proprietary attrition-resistant, high-capacity solid sorbent with excellent performance replicated at lab, bench, and pilot scales. Results indicated that WDP technology can improve both efficiency and cost of gasification plants. The WDP technology achieved ~99.9% removal of total sulfur (as either H2S or COS) from coal-derived syngas at temperatures as high as 600°C and over a wide range of pressures (20-80 bar, pressure independent performance) and sulfur concentrations. Based on the success of these tests, RTI negotiated a cooperative agreement with the U.S. Department of Energy for precommercial testing of this technology at Tampa Electric Company’s Polk Power Station IGCC facility in Tampa, Florida. The project scope also included a sweet water-gas-shift process for hydrogen enrichment and an activated amine process for 90+% total carbon capture. Because the activated amine process provides some additional non-selective sulfur removal, the integration of these processes was expected to reduce overall sulfur in the syngas to sub-ppmv concentrations, suitable for most syngas applications. The overall objective of this project was to mitigate the technical risks associated with the scale up and integration of the WDP and carbon dioxide capture technologies, enabling subsequent commercial-scale demonstration. The warm syngas cleanup pre-commercial test unit

  19. Control of heavy loads at nuclear power plants: Resolution of Generic Technical Activity A-36. Technical report

    International Nuclear Information System (INIS)

    George, H.J.

    1980-07-01

    This report summarizes work performed by the NRC staff in the resolution of Generic Technical Activity A-36, Control of Heavy Loads Near Spent Fuel. Generic Technical Activity A-36 is one of the generic technical subjects designated as unresolved safety issues pursuant to Section 210 of the Energy Reorganization Act of 1974. The report describes the technical studies and evaluations performed by the NRC staff, the staff's guidelines based on these studies, and the staff's plans for implementaton of its technical guidelines

  20. Field guide for the protection and cleanup of oiled Arctic shorelines

    International Nuclear Information System (INIS)

    Owens, E.H.

    1996-01-01

    Practical suggestions for the protection, treatment and cleanup of oiled shorelines during summer and open-water conditions are described. This manual was developed as a field guide to be used during spill response operations for the rapid identification of shoreline response options. Special attention is given to techniques that are normally available and appropriate for shoreline types and coastal environmental setting that are typical of Arctic regions. The guide is divided into four main sections: (1) shoreline protection, (2) treatment strategy by shoreline type, (3) treatment or cleanup methods, and (4) response strategies for specific environments. The importance of the type and volume of oil spilled, and the environmental factors that should be taken into account in the event of a spill (time of year, weather, ice and wave conditions) are stressed. The presence of sensitive resources such as wildlife, fish stocks, plant communities and human-use activities are also considered. tabs., figs

  1. Cleanup of large areas contaminated as a result of a nuclear accident

    International Nuclear Information System (INIS)

    1989-01-01

    The purposes of the report are to provide an overview of the methodology and technology available to clean up contaminated areas and to give preliminary guidance on matters related to the planning, implementation and management of such cleanups. This report provides an integrated overview of important aspects related to the cleanup of very large areas contaminated as a result of a serious nuclear accident, including information on methods and equipment available to: characterize the affected area and the radioactive fallout; stabilize or isolate the contamination; and clean up contaminated urban, rural and forested areas. The report also includes brief sections on planning and management considerations and the transport and disposal of the large volumes of wastes arising from such cleanups. For the purposes of this report, nuclear accidents which could result in the deposition of decontamination over large areas if the outer containment fails badly include: 1) An accident with a nuclear weapon involving detonation of the chemical high explosive but little, if any, nuclear fission. 2) A major loss of medium/high level liquid waste (HLLW) due to an explosion/fire at a storage site for such waste. 3) An accident at a nuclear power plant (NPP), for example a loss of coolant accident, which results in some core disruption and fuel melting. 4) An accident at an NPP involving an uncontrolled reactivity excursion resulting in the violent ejection of a reactor core material and rupture of the containment building. 117 refs, 32 figs, 12 tabs

  2. Use Of Renewable Energy In The Electric Power Generation Sector In Mexico: Political, Regulatory, Economic And Technical Issues From 1965 To 2018

    Energy Technology Data Exchange (ETDEWEB)

    Elizalde-Baltierra, Alberto; Sasse, Diana; Zeferino-Abundis, Yolanda; Quiroz-Juarez, Carolina; Lopez-Satow, Edgar; Beltran-Mora, Hector; Crisostomo-Ramirez, David

    2010-09-15

    The aim of this work is to analyze the political, regulatory, economic and technical issues that have determined the use of primary energies for power generation in Mexico from 1965 to 2008, and its perspectives for the next 10 years, in particular the prospects of using renewable energies. In the 60's, hydro was the preferred source of energy to produce electricity for economical and technical reasons. Under the 'oil boom' in the 70s, transition to hydrocarbons resources (fuel oil) was progressive. As a result of implementing environmental policies, electricity has mainly been generated with natural gas since the early 2000.

  3. Cleanup Verification Package for the 618-8 Burial Ground

    International Nuclear Information System (INIS)

    Appel, M.J.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 618-8 Burial Ground, also referred to as the Solid Waste Burial Ground No. 8, 318-8, and the Early Solid Waste Burial Ground. During its period of operation, the 618-8 site is speculated to have been used to bury uranium-contaminated waste derived from fuel manufacturing, and construction debris from the remodeling of the 313 Building

  4. Cleanup Verification Package for the 618-3 Burial Ground

    International Nuclear Information System (INIS)

    Appel, M.J.

    2006-01-01

    This cleanup verification package documents completion of remedial action for the 618-3 Solid Waste Burial Ground, also referred to as Burial Ground Number 3 and the Dry Waste Burial Ground Number 3. During its period of operation, the 618-3 site was used to dispose of uranium-contaminated construction debris from the 311 Building and construction/demolition debris from remodeling of the 313, 303-J and 303-K Buildings

  5. An automated online turboflow cleanup LC/MS/MS method for the determination of 11 plasticizers in beverages and milk.

    Science.gov (United States)

    Ates, Ebru; Mittendorf, Klaus; Senyuva, Hamide

    2013-01-01

    An automated sample preparation technique involving cleanup and analytical separation in a single operation using an online coupled TurboFlow (RP-LC system) is reported. This method eliminates time-consuming sample preparation steps that can be potential sources for cross-contamination in the analysis of plasticizers. Using TurboFlow chromatography, liquid samples were injected directly into the automated system without previous extraction or cleanup. Special cleanup columns enabled specific binding of target compounds; higher MW compounds, i.e., fats and proteins, and other matrix interferences with different chemical properties were removed to waste, prior to LC/MS/MS. Systematic stepwise method development using this new technology in the food safety area is described. Selection of optimum columns and mobile phases for loading onto the cleanup column followed by transfer onto the analytical column and MS detection are critical method parameters. The method was optimized for the assay of 10 phthalates (dimethyl, diethyl, dipropyl, butyl benzyl, diisobutyl, dicyclohexyl, dihexyl, diethylhexyl, diisononyl, and diisododecyl) and one adipate (diethylhexyl) in beverages and milk.

  6. CERCLA and RCRA requirements affecting cleanup of a hazardous waste management unit at a Superfund site: A case study

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1995-03-01

    The Fernald Environmental Management Project (FEMP) attempted to address both RCRA and CERCLA requirements at the fire training facility (FTF) by integrating a CERCLA removal action work plan with a RCRA closure plan. While the regulatory agencies involved with the FTF cleanup agreed the integrated document was a good idea, implementation proved complicated, owing to disposition of clean debris from a Superfund site, treatment of contaminated media, duration of cleanup activities, and cleanup certification. While all the complications have not been resolved, solutions to all have been proposed to Ohio EPA and U.S. EPA. Both agencies have worked closely with FEMP to find the most effective fulfillment of RCRA and CERCLA requirements

  7. Private-Sector Cleanup Expenditures and Transaction Costs at 18 Superfund Sites (1993)

    Science.gov (United States)

    Superfund allows the government either to clean up a site and recover its cost from the potentially responsible parties (PRPs) or to require the PRPs to undertake the cleanup themselves. This study examines private-sector expenditures and transaction-costs

  8. The socio-technical system and nuclear safety

    International Nuclear Information System (INIS)

    Stefanescu, Petre; Mihailescu, Nicolae; Dragusin, Octavian

    1999-01-01

    In the field of nuclear safety there have been defined notions like 'technical factors' and 'human factors'. The technical factors depend on designing and manufacturing of components/equipment, actually depend on the people's work. The study of human factors consists in analyzing and recommending the terms that allow an individual to be a reliable and safety agent. Accordingly, he/she is placed in working conditions corresponding to human abilities, associating the means of three levels: - designing, i.e. the action upon the technical system and upon work organization; - correction, i.e. the action upon the evolution of the technical system and organizing; - formation/training, i.e. action upon operators. The paper presents a characterization of the socio-technical system and on this basis discusses the issue of individual adjustment to the socio-technical system and reciprocally, the issue of the socio-technical system adjustment to the individual. Concepts as: ergonomics, physical medium, man/machine interface and support of the operator, man/machine task sharing, the work organizing are put in relation with the central subject, the nuclear safety

  9. Power Systems Development Facility. Quarterly report, July 1--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This quarterly technical progress report summarizes the work completed during the third quarter of a project entitled Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion. The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phase expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  10. 48 CFR 952.242-70 - Technical direction.

    Science.gov (United States)

    2010-10-01

    ... contract. (d) All technical direction shall be issued in writing by the COR. (e) The Contractor must... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  11. 48 CFR 1552.237-71 - Technical direction.

    Science.gov (United States)

    2010-10-01

    .... (d) Technical direction will be issued in writing or confirmed in writing within five (5) days after... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Technical direction. 1552... Technical direction. As prescribed in 1537.110, insert a clause substantially the same as the following...

  12. CTBT technical issues handbook

    International Nuclear Information System (INIS)

    Zucca, J.J.

    1994-05-01

    The purpose of this handbook is to give the nonspecialist in nuclear explosion physics and nuclear test monitoring an introduction to the topic as it pertains to a Comprehensive Test Ban Treaty (CTBT). The authors have tried to make the handbook visually oriented, with figures paired to short discussions. As such, the handbook may be read straight through or in sections. The handbook covers four main areas and ends with a glossary, which includes both scientific terms and acronyms likely to be encountered during CTBT negotiations. The following topics are covered: (1) Physics of nuclear explosion experiments. This is a description of basic nuclear physics and elementary nuclear weapon design. Also discussed are testing practices. (2) Other nuclear experiments. This section discusses experiments that produce small amounts of nuclear energy but differ from explosion experiments discussed in the first chapter. This includes the type of activities, such as laser fusion, that would continue after a CTBT is in force. (3) Monitoring tests in various environments. This section describes the different physical environments in which a test could be conducted (underground, in the atmosphere, in space, underwater, and in the laboratory); the sources of non-nuclear events (such as earthquakes and mining operations); and the opportunities for evasion. (4) On-site inspections. A CTBT is likely to include these inspections as an element of the verification provisions, in order to resolve the nature of ambiguous events. This chapter describes some technical considerations and technologies that are likely to be useful. (5) Selecting verification measures. This chapter discusses the uncertain nature of the evidence from monitoring systems and how compliance judgments could be made, taking the uncertainties into account. It also discusses how to allocate monitoring resources, given the likelihood of testing by various countries in various environments

  13. 48 CFR 2452.237-73 - Conduct of Work and Technical Guidance.

    Science.gov (United States)

    2010-10-01

    ... conditions of the contract. (c) The GTR will issue technical guidance in writing or, if issued orally, he/she... Technical Guidance. 2452.237-73 Section 2452.237-73 Federal Acquisition Regulations System DEPARTMENT OF... Provisions and Clauses 2452.237-73 Conduct of Work and Technical Guidance. As prescribed in 2437.110(d...

  14. Technical Issues and Proposes on the Legislation of Probabilistic Safety Assessment in Periodic Safety Review

    International Nuclear Information System (INIS)

    Hwang, Seok-Won; Jeon, Ho-Jun; Na, Jang-Hwan

    2015-01-01

    Korean Nuclear Power Plants have performed a comprehensive safety assessment reflecting design and procedure changes and using the latest technology every 10 years. In Korea, safety factors of PSR are revised to 14 by revision of IAEA Safety Guidelines in 2003. In the revised safety guidelines, safety analysis field was subdivided into deterministic safety analysis, PSA (Probabilistic safety analysis), and hazard analysis. The purpose to examine PSA as a safety factor on PSR is to make sure that PSA results and assumptions reflect the latest state of NPPs, validate the level of computer codes and analytical models, and evaluate the adequacy of PSA instructions. In addition, its purpose is to derive the plant design change, operating experience of other plants and safety enhancement items as well. In Korea, PSA is introduced as a new factor. Thus, the overall guideline development and long-term implementation strategy are needed. Today in Korea, full-power PSA model revision and low-power and shutdown (LPSD) PSA model development is being performed as a part of the post Fukushima action items for operating plants. The scope of the full-power PSA is internal/external level 1, 2 PSA. But in case of fire PSA, the scope is level 1 PSA using new method, NUREG/CR-6850. In case of LPSD PSA, level 1 PSA for all operating plants, and level 2 PSA for 2 demonstration plants are under development. The result of the LPSD PSA will be used as major input data for plant specific SAMG (Severe Accident Management Guideline). The scope of PSA currently being developed in Korea cannot fulfill 'All Mode, All Scope' requirements recommended in the IAEA Safety Guidelines. Besides the legislation of PSA, step-by-step development strategy for non-performed scopes such as level 3 PSA and new fire PSA is one of the urgent issues in Korea. This paper suggests technical issues and development strategies for each PSA technical elements.

  15. DOE technical standards list: Department of Energy standards index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    This Department of Energy (DOE) technical standards list (TSL) has been prepared by the Office of Nuclear Safety Policy and Standards (EH-31) on the basis of currently available technical information. Periodic updates of this TSL will be issued as additional information is received on standardization documents being issued, adopted, or canceled by DOE. This document was prepared for use by personnel involved in the selection and use of DOE technical standards and other Government and non-Government standards. This TSL provides listings of current DOE technical standards, non-Government standards that have been adopted by DOE, other standards-related documents in which DOE has a recorded interest, and canceled DOE technical standards. Information on new DOE technical standards projects, technical standards released for coordination, recently published DOE technical standards, and activities of non-Government standards bodies that may be of interest to DOE is published monthly in Standards Actions.

  16. Optimized cleanup method for the determination of short chain polychlorinated n-alkanes in sediments by high resolution gas chromatography/electron capture negative ion-low resolution mass spectrometry

    International Nuclear Information System (INIS)

    Gao Yuan; Zhang Haijun; Chen Jiping; Zhang Qing; Tian Yuzeng; Qi Peipei; Yu Zhengkun

    2011-01-01

    Graphical abstract: The sediment sample could be purified by the optimized cleanup method, and satisfying cleanup efficiency was obtained. Highlights: → The elution characters of sPCAs and interfering substances were evaluated on three adsorbents. → An optimized cleanup method was developed for sPCAs with satisfying cleanup efficiency. → The cleanup method combined with HRGC/ECNI-LRMS was applied for sPCAs analysis. → The sPCAs levels range from 53.6 ng g -1 to 289.3 ng g -1 in tested sediment samples. - Abstract: The performances of three adsorbents, i.e. silica gel, neutral and basic alumina, in the separation of short chain polychlorinated n-alkanes (sPCAs) from potential interfering substances such as polychlorinated biphenyls (PCBs) and organochlorine pesticides were evaluated. To increase the cleanup efficiency, a two-step cleanup method using silica gel column and subsequent basic alumina column was developed. All the PCB and organochlorine pesticides could be removed by this cleanup method. The very satisfying cleanup efficiency of sPCAs has been achieved and the recovery in the cleanup method reached 92.7%. The method detection limit (MDL) for sPCAs in sediments was determined to be 14 ng g -1 . Relative standard deviation (R.S.D.) of 5.3% was obtained for the mass fraction of sPCAs by analyzing four replicates of a spiked sediment sample. High resolution gas chromatography/electron capture negative ion-low resolution mass spectrometry (HRGC/ECNI-LRMS) was used for sPCAs quantification by monitoring [M-HCl]· - ions. When applied to the sediment samples from the mouth of the Daliao River, the optimized cleanup method in conjunction with HRGC/ECNI-LRMS allowed for highly selective identifications for sPCAs. The sPCAs levels in sediment samples are reported to range from 53.6 ng g -1 to 289.3 ng g -1 . C 10 - and C 11 -PCAs are the dominant residue in most of investigated sediment samples.

  17. Study of tunnelling through water-bearing fracture zones. Baseline study on technical issues with NE-1 as reference

    International Nuclear Information System (INIS)

    Yanting Chang; Swindell, Robert; Bogdanoff, Ingvar; Lindstroem, Beatrice; Termen, Jens; Starsec, Peter

    2005-04-01

    , based on the review of the geological and hydrogeological characteristics of the deformation zone NE-1. In the descriptive model, the water-bearing fracture zone consists of an 8 metre wide central core zone and a 15 meter wide transition zone sited on either side of the core zone. Rock mechanical and hydrogeological properties of the rock mass as well as in situ rock stresses are assigned in the descriptive model. To highlight the important technical issues in tunnelling through water-bearing fracture zones, system analysis and problem identification based on a literature review of relevant case histories are conducted. The identified important technical issues, namely large water inflow and tunnel stability, will be the objects to be analysed in this study. Control of water inflows is the key issue for the safe passage of a tunnel through a water-bearing fracture zone with the characteristics of NE-1. Technical issues associated with the two most used methods for water inflow control, namely grouting and ground freezing are discussed. The analyses regarding water inflows associated with grouting are presented. The degree of difficulty for water inflow control increases with depth. The study indicates that control of water inflows at all the depths could be achieved by grouting with current technology. But ground freezing might be an alternative for the core zone, for instance at a depth of 600 metres. Due to the high water pressure that may be encountered at a depth of 600 metres, precautions must be taken in the decision making process in selecting the most appropriate methods of groundwater control. The deformation analysis indicates that large deformations are unlikely to occur in the transition zone, even at a depth of 600 metres. The reduction in rock mass quality in the core zone, however, is likely to result in large deformations at great depths. The estimated mean values of deformation for an unsupported tunnel in the core zone are 60 mm and 130 mm at depths

  18. Study of tunnelling through water-bearing fracture zones. Baseline study on technical issues with NE-1 as reference

    Energy Technology Data Exchange (ETDEWEB)

    Yanting Chang; Swindell, Robert; Bogdanoff, Ingvar; Lindstroem, Beatrice; Termen, Jens [WSP Sweden, Stockholm (Sweden) ; Starsec, Peter [SGI, Linkoeping (Sweden)

    2005-04-01

    established, based on the review of the geological and hydrogeological characteristics of the deformation zone NE-1. In the descriptive model, the water-bearing fracture zone consists of an 8 metre wide central core zone and a 15 meter wide transition zone sited on either side of the core zone. Rock mechanical and hydrogeological properties of the rock mass as well as in situ rock stresses are assigned in the descriptive model. To highlight the important technical issues in tunnelling through water-bearing fracture zones, system analysis and problem identification based on a literature review of relevant case histories are conducted. The identified important technical issues, namely large water inflow and tunnel stability, will be the objects to be analysed in this study. Control of water inflows is the key issue for the safe passage of a tunnel through a water-bearing fracture zone with the characteristics of NE-1. Technical issues associated with the two most used methods for water inflow control, namely grouting and ground freezing are discussed. The analyses regarding water inflows associated with grouting are presented. The degree of difficulty for water inflow control increases with depth. The study indicates that control of water inflows at all the depths could be achieved by grouting with current technology. But ground freezing might be an alternative for the core zone, for instance at a depth of 600 metres. Due to the high water pressure that may be encountered at a depth of 600 metres, precautions must be taken in the decision making process in selecting the most appropriate methods of groundwater control. The deformation analysis indicates that large deformations are unlikely to occur in the transition zone, even at a depth of 600 metres. The reduction in rock mass quality in the core zone, however, is likely to result in large deformations at great depths. The estimated mean values of deformation for an unsupported tunnel in the core zone are 60 mm and 130 mm at

  19. Fernald incident underscores DOE cleanup woes

    International Nuclear Information System (INIS)

    Lobsenz, G.

    1994-01-01

    Miscalculations and poor safety planning led to a large release of deadly gas during an error-plagued effort to plug a leaking uranium hexafluoride canister discovered lying in a scrap heap at the Energy Department's Fernald plant last year, according to a DOE investigative report. Investigators with DOE's Office of Environment, Safety and Health said serious injury was avoided only because the wind happened to blow the toxic cloud of hydrogen fluoride gas away from inadequately protected Fernald workers watching the July 1993 canister-plugging operation at the Ohio plant. The investigators said the 25-minute canister repair effort - captured on videotape - was marked by poor planning by the Fernald Environmental Restoration Management Corp. (FERMCO), a Fluor Daniel subsidiary hired by DOE for its cleanup expertise

  20. Solar-Assisted Fast Cleanup of Heavy Oil Spill by a Photothermal Sponge

    KAUST Repository

    Chang, Jian; Shi, Yusuf; Wu, Mengchun; Li, Renyuan; Shi, Le; Jin, Yong; Qing, Weihua; Tang, Chuyang; Wang, Peng

    2018-01-01

    of the photothermal effect to heating the heavy oil by using sunlight as energy source to significantly reduce the viscosity of the heavy oil and thus to achieve a fast heavy oil cleanup. A carbon nanotube (CNT) modified polyurethane sponge was fabricated

  1. Magnetic fusion energy plasma interactive and high heat flux components. Volume I. Technical assessment of the critical issues and problem areas in the plasma materials interaction field

    International Nuclear Information System (INIS)

    Conn, R.W.; Gauster, W.B.; Heifetz, D.; Marmar, E.; Wilson, K.L.

    1984-01-01

    A technical assessment of the critical issues and problem areas in the field of plasma materials interactions (PMI) in magnetic fusion devices shows these problems to be central for near-term experiments, for intermediate-range reactor devices including D-T burning physics experiments, and for long-term reactor machines. Critical technical issues are ones central to understanding and successful operation of existing and near-term experiments/reactors or devices of great importance for the long run, i.e., ones which will require an extensive, long-term development effort and thus should receive attention now. Four subgroups were formed to assess the critical PMI issues along four major lines: (1) PMI and plasma confinement physics experiments; (2) plasma-edge modelling and theory; (3) surface physics; and (4) materials technology for in-vessel components and the first wall. The report which follows is divided into four major sections, one for each of these topics

  2. Opukushi horizontal well campaign: completion design and wellbore clean-up

    Energy Technology Data Exchange (ETDEWEB)

    Osode, P. I.; Dijkema, R. W. [Shell Petroleum Development Company of Nigeria (Nigeria)

    1998-12-31

    A three-well completion design and installation technique, and a horizontal well clean-up procedure employed as part of the on-going initiative to improve the Opukushi Oilfield in Nigeria was described. In an effort to improve the Field`s ultimate recovery and production potential, horizontal well technology was introduced during the second phase of field development which started in 1995. Openhole liner completion was the design of choice, dictated by the unconsolidated sandstone formation which characterizes the shallow horizons of the field. All three wells were completed in thin oil rim sands of about 70 ft, with 5-1/2 inch by 4-1/2 inch tapered slotted liner assemblies installed across 2300 to 3300 ft of 8-1/2 inch drainhole sections. Drilling was completed with low-solids drilling fluid; well clean-up was done with a coil-tubing unit using nitrified acid at underbalance condition. In addition to a description of the design and liner completion considerations, the paper also includes a comparison of performance data from the three wells with performance of conventional wells. A productivity improvement factor of 10 or better was reported for each of the wells. 6 refs., 2 tabs., 14 figs.

  3. New arrangement for the air cleanup system to recover tritium

    International Nuclear Information System (INIS)

    Nishikawa, Masabumi; Takahashi, Kohsaku; Munakata, Kenzo; Fukada, Satoshi; Kotoh, Kenji; Takeishi, Toshiharu

    1997-01-01

    At present, the standard arrangement of the air cleanup system responsible for emergency tritium recovery from room air is a catalytic oxidation bed with a heater followed by an adsorption bed with a cooler. One disadvantage of this arrangement is that trouble with the heater or the cooler could result in a loss of capacity to recover tritium. Another disadvantage of the catalyst-adsorption-bed arrangement is that tritiated water must be recovered with a high decontamination factor after dilution with a large amount of water vapor in the working atmosphere. The performance of a new arrangement for the air cleanup system, which consists of a precious metal catalyst bed preceded by an adsorption bed without heating equipment, is discussed. According to calculations, most of the tritium released to the room air is recovered in the catalyst bed through oxidation, adsorption, and isotope exchange reaction when the new arrangement is applied. The adsorption bed placed before the catalyst bed dehumidifies the process gas to such a degree that the oxidation reaction of tritium in the catalyst bed is not hindered by water vapor. 15 refs., 6 figs., 6 tabs

  4. Early aging in Chernobyl clean-up workers: long-term study.

    Science.gov (United States)

    Krasnov, V; Kryukov, V; Samedova, E; Emelianova, I; Ryzhova, I

    2015-01-01

    This paper represents data of long-term open prospective study. 312 male clean-up workers, who participated in elimination of the Chernobyl disaster consequences in 1986-87, were observed and examined in Moscow Research Institute of Psychiatry. The average age of patients was 57,0 ± 6,8 years. All patients were diagnosed with psychoorganic syndrome, caused by combination of different factors, which led to early cerebrovascular pathology, which was confirmed by clinical, neuropsychological, and instrumental examination. Anamnesis and the level of social adaptation were also assayed. Clinical estimation was done with the use of specially developed Clinical Psychopathological Chart. All the symptoms were divided into 4 groups (asthenic, psychovegetative, dysthymic, and cognitive symptom-complexes). No pronounced signs of dementia were observed. The control group included 44 clean-up workers without mental disorders. Predomination of various exogenous factors before and after accident was noted. Therapy included different vasotropic remedies, as well as family therapy, art therapy, and cognitive training. The possibilities of the reverse development of symptoms were statistically proved. The results allow making a conclusion that these disorders could not be explained either by radiation effects or by PTSD but connected with cerebrovascular pathology.

  5. Early Aging in Chernobyl Clean-Up Workers: Long-Term Study

    Directory of Open Access Journals (Sweden)

    V. Krasnov

    2015-01-01

    Full Text Available This paper represents data of long-term open prospective study. 312 male clean-up workers, who participated in elimination of the Chernobyl disaster consequences in 1986-87, were observed and examined in Moscow Research Institute of Psychiatry. The average age of patients was 57,0 ± 6,8 years. All patients were diagnosed with psychoorganic syndrome, caused by combination of different factors, which led to early cerebrovascular pathology, which was confirmed by clinical, neuropsychological, and instrumental examination. Anamnesis and the level of social adaptation were also assayed. Clinical estimation was done with the use of specially developed Clinical Psychopathological Chart. All the symptoms were divided into 4 groups (asthenic, psychovegetative, dysthymic, and cognitive symptom-complexes. No pronounced signs of dementia were observed. The control group included 44 clean-up workers without mental disorders. Predomination of various exogenous factors before and after accident was noted. Therapy included different vasotropic remedies, as well as family therapy, art therapy, and cognitive training. The possibilities of the reverse development of symptoms were statistically proved. The results allow making a conclusion that these disorders could not be explained either by radiation effects or by PTSD but connected with cerebrovascular pathology.

  6. Efficiency of different protocols for enamel clean-up after bracket debonding: an in vitro study

    Directory of Open Access Journals (Sweden)

    Lara Carvalho Freitas Sigilião

    2015-10-01

    Full Text Available Objective: This study aimed to assess the efficiency of six protocols for cleaning-up tooth enamel after bracket debonding.Methods:A total of 60 premolars were divided into six groups, according to the tools used for clean-up: 12-blade bur at low speed (G12L, 12-blade bur at high speed (G12H, 30-blade bur at low speed (G30L, DU10CO ORTHO polisher (GDU, Renew System (GR and Diagloss polisher (GD. Mean roughness (Ra and mean roughness depth (Rz of enamel surface were analyzed with a profilometer. Paired t-test was used to assess Ra and Rz before and after enamel clean-up. ANOVA/Tukey tests were used for intergroup comparison. The duration of removal procedures was recorded. The association between time and variation in enamel roughness (∆Ra, ∆Rz were evaluated by Pearson's correlation test. Enamel topography was assessed by scanning electron microscopy (SEM.Results:In Groups G12L and G12H, original enamel roughness did not change significantly. In Groups G30L, GDU, GR and GD, a smoother surface (p < 0.05 was found after clean-up. In Groups G30L and GD, the protocols used were more time-consuming than those used in the other groups. Negative and moderate correlation was observed between time and (∆Ra, ∆Rz; Ra and (∆Ra, ∆Rz; Rz (r = - 0.445, r = - 0.475, p < 0.01.Conclusion:All enamel clean-up protocols were efficient because they did not result in increased surface roughness. The longer the time spent performing the protocol, the lower the surface roughness.

  7. TRUEX process solvent cleanup with solid sorbents

    International Nuclear Information System (INIS)

    Tse, Pui-Kwan; Reichley-Yinger, L.; Vandegrift, G.F.

    1989-01-01

    Solid sorbents, alumina, silica gel, and Amberlyst A-26 have been tested for the cleanup of degraded TRUEX-NPH solvent. A sodium carbonate scrub alone does not completely remove acidic degradation products from highly degraded solvent and cannot restore the stripping performance of the solvent. By following the carbonate scrub with either neutral alumina or Amberlyst A-26 anion exchange resin, the performance of the TRUEX-NPH is substantially restored. The degraded TRUEX-NPH was characterized before and after treatment by supercritical fluid chromatography. Its performance was evaluated by americium distribution ratios, phase-separation times, and lauric acid distribution coefficients. 17 refs., 2 figs., 5 tabs

  8. Nordic study on reactor waste. Technical part 1 and 2

    International Nuclear Information System (INIS)

    1981-08-01

    An important part of the Nordic studies on system- and safety analysis of the management of low and medium level radioactive waste from nuclear power plants, is the safety analysis of a Reference System. This reference system was established within the study and is described in this Technical Part 1. The reference system covers waste management Schemes that are potential possibilities in either one of the four participating Nordic countries. The reference system is based on: a power reactor system consisting of 6 BWR's of 500 MWe each, operated simultaneously over the same 30 year period, and deep bed granular ion exchange resin wastes from the Reactor Water Clean-Up System (RWCS and powdered ion exchange resin from the Spent Fuel Pool Cleanup System (SFPCS)). Both waste types are supposed to be solidified by mixing with cement and bitumen. Two basic types of containers are considered. Standard 200 liter steel drums and specially made cubicreinforced concrete moulds with a net volume of 1 m 3 . The Nordic study assumes temporary storage of the solidified waste for a maximum of 50 years before the waste is transferred to the disposal site. Transportation of the waste from the storage facilitiy to the disposal site will be by road or sea. Three different disposal facilities are considered: Shallow land burial, near surface concrete bunker, and rock cavern with about 30 m granite cover. (EG)

  9. Determination of fusaric acid in maize using molecularly imprinted SPE clean-up

    Science.gov (United States)

    A new liquid chromatography method to detect fusaric acid in maize is reported based on molecularly imprinted polymer solid phase extraction clean-up (MISPE) using mimic-templated molecularly-imprinted polymers. Picolinic acid was used as a toxin analog for imprinting polymers during a thermolytic s...

  10. Works Technical Department progress report, March 1961

    Energy Technology Data Exchange (ETDEWEB)

    None

    1961-04-19

    This document details the activities of the Savannah River Works Technical Department during the month of March 1961. Topics discussed are: Reactor Technology, Separations Technology, Engineering Assistance, Health Physics, Laboratories Overview, and Technical Papers Issued.

  11. Negotiating NORM cleanup and land use limits: Practical use of dose assessment and cost benefit analysis

    International Nuclear Information System (INIS)

    Blanchard, A.D.H.

    1997-01-01

    Oil companies are presently faced with complex and costly environmental decisions, especially concerning NORM cleanup and disposal. Strict cleanup limits and disposal restrictions are established, in theory, to protect public health and environment. While public health is directly measured in terms of dose (mrem/yr), most NORM regulations adopt soil concentration limits to ensure future public health is maintained. These derived soil limits create the potential for unnecessary burden to operators without additional health benefit to society. Operators may use a dose assessment to show direct compliance with dose limits, negotiating less restrictive cleanup levels and land use limits. This paper discusses why a dose assessment is useful to Oilfield operators, NORM exposure scenarios and pathways, assessment advantages, variables and recommendations and one recent dose assessment application. Finally, a cost benefit analysis tool for regulatory negotiations will be presented allowing comparison of Oilfield NORM health benefit costs to that of other industries. One use for this tool--resulting in the savings of approximately $100,000--will be discussed

  12. Cleanup Verification Package for the 118-F-6 Burial Ground

    International Nuclear Information System (INIS)

    Sulloway, H.M.

    2008-01-01

    This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car

  13. Public comments and responses to the 1989 Hanford cleanup five-year plan

    International Nuclear Information System (INIS)

    1991-06-01

    In April 1990 the US Department of Energy (DOE) issued a site- specific Five-Year Plan (DOE-RL 1989a) on Hanford's cleanup for public review and comment. The plan guides Hanford in carrying out DOE's national plan for environmental restoration and waste management. During the 90-day public comment period, DOE held nine public meetings to answer questions and gather comments on the plan. This report is in three main sections. The first presents consolidated public comments and responses. These were compiled from both verbal comments from public meetings and written comments. The second section contains comments not responded to in this plan. Those comments were outside this plan's scope, related to how we gathered public comments, or intended for and directed to DOE-Headquarters. In the appendixes are the written comment letters we received and a short glossary and list of special terms we use. The source of comments is shown in parentheses after the comment. The individual who made the comment, the city of the public meeting, or the organization name is generally used. When several sources gave the same comment, a source was not listed. 26 refs

  14. Bioremediation case study: Fuel-contaminated soil cleanup in the Marshall Islands

    International Nuclear Information System (INIS)

    Machanoff, R.

    1992-01-01

    Using microbes to degrade fuels in contaminated soils is becoming increasingly more attractive as an approach to environmental restoration. Removing contamination by traditional methods is costly, does not always eliminate the problem, and often just moves it somewhere else. Biodegradation of contaminants can often be accomplished in situ, resulting in the actual destruction of the contaminants by microbial conversion to harmless by-products. Bioremediation is not applicable to all forms of environmental contamination but has been demonstrated to be particularly effective on petroleum hydrocarbon based fuels. Bioremediation can offer a cost-effective means for site cleanup, particularly where challenging logistical considerations have to be factored into cleanup projects. Logistical considerations have made bioremediation the method of choice for the decontamination of fuel-containing soils on Kwajalein Island, Republic of the Marshall Islands. Kwajalein is located more than 2,100 miles west of Hawaii in the southernmost part of the North Pacific. The site of a major missile range of the Strategic Defense Command (SDC), Kwajalein has been the center of US defense activities for almost 50 years. The island is part of a typical coral atoll and is only 2.5 miles long and 0.5 miles wide. Mission-related activities over the past 5 decades have resulted in about 10% of the island being contaminated with diesel, gasoline, and jet fuels. SDC has executed an agreement with the Department of Energy for the Hazardous Waste Remedial Actions Program (HAZWRAP), a division of Martin Marietta Energy Systems, Inc., to assist the US Army Kwajalein Atoll (USAKA) in the management of the Base restoration activities on Kwajalein Atoll. HAZWRAP initiated sampling and feasibility studies to determine whether bioremediation was a viable choice for site cleanup at USAKA

  15. Improvements of primary coolant shutdown chemistry and reactor coolant system cleanup

    International Nuclear Information System (INIS)

    Gaudard, G.; Gilles, B.; Mesnage, F.; Cattant, F.

    2002-01-01

    In the framework of a radiation exposure management program entitled >, EDF aims at decreasing the mass dosimetry of nuclear power plants workers. So, the annual dose per unit, which has improved from 2.44 m.Sv in 1991 to 1.08 in 2000, should target 0.8 mSv in the year 2005 term in order to meet the results of the best nuclear operators. One of the guidelines for irradiation source term reduction is the optimization of operation parameters, including reactor coolant system (RCS) chemistry in operation, RCS shutdown chemistry and RCS cleanup improvement. This paper presents the EDF strategy for the shutdown and start up RCS chemistry optimization. All the shutdown modes have been reviewed and for each of them, the chemical specifications will be fine tuned. A survey of some US PWRs shutdown practices has been conducted for an acid and reducing shutdown chemistry implementation test at one EDF unit. This survey shows that deviating from the EPRI recommended practice for acid and reducing shutdown chemistry is possible and that critical path impact can be minimized. The paper also presents some investigations about soluble and insoluble species behavior and characterization; the study focuses here on 110m Ag, 122 Sb, 124 Sb and iodine contamination. Concerning RCS cleanup improvement, the paper presents two studies. The first one highlights some limited design modifications that are either underway or planned, for an increased flow rate during the most critical periods of the shutdown. The second one focuses on the strategy EDF envisions for filters and resins selection criteria. Matching the study on contaminants behavior with the study of filters and resins selection criteria should allow improving the cleanup efficiency. (authors)

  16. SLIM-MAUD: an approach to assessing human error probabilities using structured expert judgment. Volume II. Detailed analysis of the technical issues

    International Nuclear Information System (INIS)

    Embrey, D.E.; Humphreys, P.; Rosa, E.A.; Kirwan, B.; Rea, K.

    1984-07-01

    This two-volume report presents the procedures and analyses performed in developing an approach for structuring expert judgments to estimate human error probabilities. Volume I presents an overview of work performed in developing the approach: SLIM-MAUD (Success Likelihood Index Methodology, implemented through the use of an interactive computer program called MAUD-Multi-Attribute Utility Decomposition). Volume II provides a more detailed analysis of the technical issues underlying the approach

  17. Public Communication of Technical Issues in Today's Changing Visual Language - 12436

    Energy Technology Data Exchange (ETDEWEB)

    Hermann, Laura [Potomac Communications Group (United States)

    2012-07-01

    Communication regarding the management of radioactive materials is a well-established challenge. Residents and consumers have suspected for years that companies and governments place short-term economic concerns ahead of health and safety. This skepticism is compounded with increased attention to safety issues at nuclear power plants everywhere after Fukushima. Nonetheless, today's environment presents unexpected opportunities to transform public fear into teachable moments that bring knowledge and facts to discussions on nuclear energy. In the weeks following Japan's crisis, the lack of reliable information on radiation levels saw citizens taking to the streets with dosimeters and Geiger counters in crowd-sourced radiation monitoring efforts. Efforts, based mainly online, represent a growing set of examples of how internet and cell-phone technology are being put to use in emergency situations. The maps, graphs and tables created to meet public interest also exemplify some of the psychological priorities of audiences and present learning tools that can improve future education efforts in non-emergency situations. Industry outreach efforts often consist of technical details and quantitative data that are difficult for lay audiences to interpret. The intense attention to nuclear energy issues since last March has produced a wide array of visual samples. Citizen monitors, news organizations, government agencies and others have displayed quantitative information in innovative ways. Their efforts offer new perspective on what charts, maps and info graphics do - or need to do - to illustrate requirements, record assessments and promote understanding of nuclear-waste issues. Surveying the best examples, nuclear communicators can improve their offerings of easy-to-use, evidence-based visuals to inform stakeholders. Familiar to most communications professionals in the nuclear industry, risk communication is a science-based approach with over three decades of

  18. 'Mini'-Roadmapping - Ensuring Timely Sites' Cleanup/Closure by Resolving Science and Technology Issues

    International Nuclear Information System (INIS)

    Dale Luke; James Murphy

    2003-01-01

    Roadmapping is a powerful tool to manage technical risks and opportunities associated with complex problems. Roadmapping identifies technical capabilities required for both project- and program-level efforts and provides the basis for plans that ensure the necessary enabling activities will be done when needed. Roadmapping reveals where to focus further development of the path forward by evaluating uncertainties for levels of complexity, impacts, and/or the potential for large payback. Roadmaps can be customized to the application, a ''graded approach'' if you will. Some roadmaps are less detailed. We have called these less detailed, top-level roadmaps ''mini-roadmaps''. These miniroadmaps are created to tie the needed enablers (e.g., technologies, decisions, etc.) to the functions. If it is found during the mini-roadmapping that areas of significant risk exist, then those can be road mapped further to a lower level of detail. Otherwise, the mini-roadmap may be sufficient to manage the project/program risk. Applying a graded approach to the roadmapping can help keep the costs down. Experience has indicated that it is best to do mini-roadmapping first and then evaluate the risky areas to determine whether to further evaluate those areas. Roadmapping can be especially useful for programs/projects that have participants from multiple sites, programs, or other entities which are involved. Increased synergy, better communications, and increased cooperation are the results from roadmapping a program/project with these conditions. And, as with any trip, the earlier you use a roadmap, the more confidence you will have that you will arrive at your destination with few, if any, problems. The longer the trip or complicated the route, the sooner the map is needed. This analogy holds true for using roadmapping for laying out program/project baselines and any alternative (contingency) plans. The mini-roadmapping process has been applied to past projects like the hydrogen gas

  19. A simplified model of natural and mechanical removal to estimate cleanup equipment efficiency

    International Nuclear Information System (INIS)

    Lehr, W.

    2001-01-01

    Oil spill response organizations rely on modelling to make decisions in offshore response operations. Models are used to test different cleanup strategies and to measure the expected cost of cleanup and the reduction in environmental impact. The oil spill response community has traditionally used the concept of worst case scenario in developing contingency plans for spill response. However, there are many drawbacks to this approach. The Hazardous Materials Response Division of the National Oceanic and Atmospheric Administration in Cooperation with the U.S. Navy Supervisor of Salvage and Diving has developed a Trajectory Analysis Planner (TAP) which will give planners the tool to try out different cleanup strategies and equipment configurations based upon historical wind and current conditions instead of worst-case scenarios. The spill trajectory model is a classic example in oil spill modelling that uses advanced non-linear three-dimensional hydrodynamical sub-models to estimate surface currents under conditions where oceanographic initial conditions are not accurately known and forecasts of wind stress are unreliable. In order to get better answers, it is often necessary to refine input values rather than increasing the sophistication of the hydrodynamics. This paper described another spill example where the level of complexity of the algorithms needs to be evaluated with regard to the reliability of the input, the sensitivity of the answers to input and model parameters, and the comparative reliability of other algorithms in the model. 9 refs., 1 fig

  20. Major issues associated with DOE commercial recycling initiatives

    International Nuclear Information System (INIS)

    Motl, G.P.; Burns, D.D.; Rast, D.M.

    1994-01-01

    Major initiatives are underway within DOE to recycle large volumes of scrap material generated during cleanup of the DOE Weapons Complex. These recycling initiatives are driven not only by the desire to conserve natural resources, but also by the recognition that shallow level burial is not a politically acceptable option. The Fernald facility is in the vanguard of a number of major DOE recycling efforts. These early efforts have brought issues to light that can have a major impact on the ability of Fernald and other major DOE sites to expand recycling efforts in the future. Some of these issues are; secondary waste deposition, title to material and radioactive contaminants, mixed waste generated during recycling, special nuclear material possession limits, cost benefit, transportation of waste to processing facilities, release criteria, and uses for beneficially reused products