  1. A systematic assessment of the state of hazardous waste clean-up technologies. Quarterly technical progress report, April 1--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Berg, M.T.; Reed, B.E.; Gabr, M.

    1993-07-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushing (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.

  2. Particulate hot gas stream cleanup technical issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    This is the tenth in a series of quarterly reports describing the activities performed under Contract No. DE-AC21-94MC31160. Analyses of Hot Gas Stream Cleanup (HGCU) ashes and descriptions of filter performance address aspects of filter operation that are apparently linked to the characteristics of the collected ash or the performance of the ceramic bed filter elements. Task I is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters (APFS) and to relate these ash properties to the operation and performance of these filters. Task 2 concerns testing and failure analysis of ceramic filter elements. Under Task I during the past quarter, analyses were performed on a particulate sample from the Transport Reactor Demonstration Unit (TRDU) located at the University of North Dakota Energy and Environmental Research Center. Analyses are in progress on ash samples from the Advanced Particulate Filter (APF) at the Pressurized Fluidized-Bed Combustor (PFBC) that was in operation at Tidd and ash samples from the Pressurized Circulating Fluid Bed (PCFB) system located at Karhula, Finland. A site visit was made to the Power Systems Development Facility (PSDF) to collect ash samples from the filter vessel and to document the condition of the filter vessel with still photographs and videotape. Particulate samples obtained during this visit are currently being analyzed for entry into the Hot Gas Cleanup (HGCU) data base. Preparations are being made for a review meeting on ash bridging to be held at Department of Energy Federal Energy Technology Center - Morgantown (DOE/FETC-MGN) in the near future. Most work on Task 2 was on hold pending receipt of additional funds; however, creep testing of Schumacher FT20 continued. The creep tests on Schumacher FT20 specimens just recently ended and data analysis and comparisons to other data are ongoing. A summary and analysis of these creep results will be sent out shortly. Creep

  3. Particulate hot gas stream cleanup technical issues

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    This is the eleventh in a series of quarterly reports describing the activities performed under Contract No. DE-AC21-94MC31160. Analyses of Hot Gas Stream Cleanup (HGCU) ashes and descriptions of filter performance address aspects of filter operation that are apparently linked to the characteristics of the collected ash or the performance of the ceramic bed filter elements. Task 1 is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters (APFS) and to relate these ash properties to the operation and performance of these filters. Task 2 concerns testing and failure analysis of ceramic filter elements. Under Task 1 during the past quarter, analyses were completed on samples obtained during a site visit to the Power Systems Development Facility (PSDF). Analyses are in progress on ash samples from the Advanced Particulate Filter (APF) at the Pressurized Fluidized-Bed Combustor (PFBC) that was in operation at Tidd and ash samples from the Pressurized Circulating Fluid Bed (PCFB) system located at Karhula, Finland. An additional analysis was performed on a particulate sample from the Transport Reactor Demonstration Unit (TRDU) located at the University of North Dakota Energy and Environmental Research Center. A manuscript and poster were prepared for presentation at the Advanced Coal-Based Power and Environmental Systems `97 Conference scheduled for July 22 - 24, 1997. A summary of recent project work covering the mechanisms responsible for ash deposit consolidation and ash bridging in APF`s collecting PFB ash was prepared and presented at FETC-MGN in early July. The material presented at that meeting is included in the manuscript prepared for the Contractor`s Conference and also in this report. Task 2 work during the past quarter included mechanical testing and microstructural examination of Schumacher FT20 and Pall 326 as- manufactured, after 540 hr in service at Karhula, and after 1166 hr in service at

  4. Particulate hot gas stream cleanup technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Pontius, D.H.; Snyder, T.R.

    1999-09-30

    The analyses of hot gas stream cleanup particulate samples and descriptions of filter performance studied under this contract were designed to address problems with filter operation that have been linked to characteristics of the collected particulate matter. One objective of this work was to generate an interactive, computerized data bank of the key physical and chemical characteristics of ash and char collected from operating advanced particle filters and to relate these characteristics to the operation and performance of these filters. The interactive data bank summarizes analyses of over 160 ash and char samples from fifteen pressurized fluidized-bed combustion and gasification facilities utilizing high-temperature, high pressure barrier filters.

  5. The ecological impact of land restoration and cleanup. Technical report

    International Nuclear Information System (INIS)

    The report is concerned with the ecological impacts of specific cleanup treatment on the land where they were carried out. The cleanup procedures given apply equally to chemical or radioactive materials. Guidance is provided for cleanup procedures likely to be suggested by government, industry, or environmental groups. The basic types of cleanup procedures for removing or deactiving spilled contamination involve moving people and animals from the affected area, scraping and grading the contaminated soil into windrows, plowing the contamination under, or digging up the contamination and hauling it away. The report describes and evaluates the various land-type cleanup effects in terms of impact of the techniques on the environment. Part I defines several natural ecosystems and some of their natural derivations. Part II presents managed ecosystems which are imposed on natural ecosystems and are no longer bound by the initial native ecosystem balances. Part III deals with avion and mammilian wild life displaced by cleanup

  6. Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

  7. Power systems development facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This quarterly technical progress report summarizes work completed during the last quarter of the Second Budget Period, January 1 through March 31, 1994, entitled {open_quotes}Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.{close_quotes} The objective of this project is to evaluate hot gas particulate control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

  8. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  9. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  10. Yucca Mountain Site Characterization Project Technical Data Catalog (Quarterly supplement)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  11. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  12. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the first Quarterly Technical Progress Report for Year 2 of the Agreement. This report reflects the progress and/or efforts performed on the sixteen (16) technical projects encompassed by the Year 2 Agreement for the period of January 1 through March 31, 1994. In situ bioremediation of chlorinated organic solvents; Microbial enrichment for enhancing in-situ biodegradation of hazardous organic wastes; Treatment of volatile organic compounds (VOCs) using biofilters; Drain-enhanced soil flushing (DESF) for organic contaminants removal; Chemical destruction of chlorinated organic compounds; Remediation of hazardous sites with steam reforming; Soil decontamination with a packed flotation column; Use of granular activated carbon columns for the simultaneous removal of organics, heavy metals, and radionuclides; Monolayer and multilayer self-assembled polyion films for gas-phase chemical sensors; Compact mercuric iodide detector technology development; Evaluation of IR and mass spectrometric techniques for on-site monitoring of volatile organic compounds; A systematic database of the state of hazardous waste clean-up technologies; Dust control methods for insitu nuclear and hazardous waste handling; Winfield Lock and Dam remediation; and Socio-economic assessment of alternative environmental restoration technologies.

  13. Quarterly Technical Progress Report June 2015

    Energy Technology Data Exchange (ETDEWEB)

    Buchholz, Bruce A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-08

    The project has two main goals: 1) Identify the types of adducts naphthalene (NA) forms with DNA and 2) determine whether adduct formation correlates with site selective tumor formation in defined subcompartments of the respiratory tract (respiratory and olfactory nasal epithelium and airways of mice, rats and rhesus monkeys). Five tasks are associated with the completion of the goals. Task 1: Contracting and Animal Use Approvals. IACUC and ACURO approvals are complete, The subcontract with UC Davis (UCD) was executed in December 2014. Task 2: Perform In Vitro Study for Goal 1. Rat samples exposed and in freezer while adduct standards are being made. Mouse samples need to be exposed in next quarter. Task 3: Perform In Vitro Study for Goal 2. Mouse ex vivo samples completed. Rat and monkey samples need to be completed in the next quarter. Task 4: Sample Preparation and Analysis. Mouse Goal 2 samples completed. Other samples remain to be done. Task 5: Data Interpretation and Reporting. Need rat data to write paper on adduct formation.

  14. Technical support for the EPA cleanup rule on radioactively contaminated sites

    Energy Technology Data Exchange (ETDEWEB)

    Hull, H.B.; Newman, A.; Wolbarst, A.B. [Environmental Protection Agency, Washington, DC (United States)] [and others

    1995-12-31

    The U.S. Environmental Protection Agency (EPA) is developing a radiation site cleanup regulation for the protection of the public from radionuclide contamination at sites that are to be cleaned up and released for public use. The regulation will apply to sites under the control of Federal agencies, and to sites licensed by the Nuclear Regulatory Commission (NRC) or NRC Agreement States. The agency is therefore conducting a comprehensive technical analysis aimed at developing information that will be used to support the rule. This presentation describes the regulation and the approach developed to determine how radiological health impacts and volumes of soil requiring remediation vary as functions of the possible cleanup dose or risk level.

  15. EPA's technical methodology for the development of cleanup regulations for radioactively-contaminated soils and buildings

    International Nuclear Information System (INIS)

    The total number of sites contaminated with radionuclides in the United States is in the thousands. These sites range in size from corners of laboratories to sprawling nuclear weapons facilities covering many square miles of land. The U.S. Environmental Protection Agency (EPA) is proposing regulations for the protection of the public from radionuclide contamination at sites that are to be cleaned up and released for public use. The rule will apply to site under the control of Federal agencies, and to sites licensed by the Nuclear Regulatory Commission (NRC) or NRC Agreement States. In support of this rulemaking, EPA is conducting a comprehensive technical analysis which will provide information on the volumes of soil requiring remediation at various possible dose and risk levels. The analysis will also provide information at different cleanup levels on the number of potential adverse health effects among people living or working on or near a site following the cleanup of its radioactive contamination. This paper summarizes the overall approach for the technical analysis. (author)

  16. Technical Data Catalog: Yucca Mountain Site Characterization Project. Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-30

    This report presents reference information contained in the Yucca Mountain Project Automated Technical Data Tracking System. The Department of Energy is seeking to design and maintain a geologic repository for the disposal of high-level radioactive wastes. However, before this repository can be built, the DOE must first do a comprehensive site evaluation. This evaluation is subject to many regulations. This report fulfills the reporting requirements of the Site-Specific Procedural Agreement for Geologic Repository to develop and maintain a catalog of data which will be updated and provided to the Nuclear Regulatory Commission on a quarterly basis. This catalog contains: description of data; time, place, and method of acquisition; and where data may be examined.

  17. Technical Data Catalog: Yucca Mountain Site Characterization Project. Quarterly supplement

    International Nuclear Information System (INIS)

    This report presents reference information contained in the Yucca Mountain Project Automated Technical Data Tracking System. The Department of Energy is seeking to design and maintain a geologic repository for the disposal of high-level radioactive wastes. However, before this repository can be built, the DOE must first do a comprehensive site evaluation. This evaluation is subject to many regulations. This report fulfills the reporting requirements of the Site-Specific Procedural Agreement for Geologic Repository to develop and maintain a catalog of data which will be updated and provided to the Nuclear Regulatory Commission on a quarterly basis. This catalog contains: description of data; time, place, and method of acquisition; and where data may be examined

  18. Technical papers presented at a DOE meeting on criteria for cleanup of transuranium elements in soil

    International Nuclear Information System (INIS)

    Transuranium element soil contamination cleanup experience gained from nuclear weapons accidents and cleanup at Eniwetok Atoll was reviewed. Presentations have been individually abstracted for inclusion in the data base

  19. Technical papers presented at a DOE meeting on criteria for cleanup of transuranium elements in soil

    Energy Technology Data Exchange (ETDEWEB)

    1984-09-01

    Transuranium element soil contamination cleanup experience gained from nuclear weapons accidents and cleanup at Eniwetok Atoll was reviewed. Presentations have been individually abstracted for inclusion in the data base. (ACR)

  20. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1997, July--September

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. This report contains the third quarter 1997 abstracts

  1. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1997, July--September

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, L.L.

    1998-01-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. This report contains the third quarter 1997 abstracts.

  2. Building organizational technical capabilities: a new approach to address the office of environmental management cleanup challenges in the 21. century

    International Nuclear Information System (INIS)

    The United States Department of Energy (DOE), Office of Environmental Management (EM) is responsible for the nations nuclear weapons program legacy wastes cleanup. The EM cleanup efforts continue to progress, however the cleanup continues to be technologically complex, heavily regulated, long-term, and a high life cycle cost estimate (LCCE) effort. Over the past few years, the EM program has undergone several changes to accelerate its cleanup efforts with varying degrees of success. Several cleanup projects continued to experience schedule delays and cost growth. The schedule delays and cost growth have been attributed to several factors such as changes in technical scope, regulatory and safety considerations, inadequacy of acquisition approach and project management. This article will briefly review the background and schools of thought on strategic management and organizational change practiced in the United States over the last few decades to improve an organisation's competitive edge and cost performance. The article will briefly review examples such as the change at General Electric, and the recent experience obtained from the nuclear industry, namely the long-term response to the 1986 Chernobyl accident. The long-term response to Chernobyl, though not a case of organizational change, could provide some insight in the strategic management approaches used to address people issues. The article will discuss briefly EM attempts to accelerate cleanup over the past few years, and the subsequent paradigm shift. The paradigm shift targets enhancing and/or creating organizational capabilities to achieve cost savings. To improve its ability to address the 21. century environmental cleanup challenges and achieve cost savings, EM has initiated new corporate changes to develop new and enhance existing capabilities. These new and enhanced organizational capabilities include a renewed emphasis on basics, especially technical capabilities including safety, project management

  3. Potential impact of licensee default on cleanup of TMI-2. Technical report

    International Nuclear Information System (INIS)

    Financial repercussions of the accident at Three Mile Island Unit 2 on the ability of the Licensee, Metropolitan Edison Co., to complete cleanup of the facility are examined. Potential impacts of licensee default on cleanup and alternatives to minimize the potential of bankruptcy are discussed. Specific recommendations are made regarding steps the Nuclear Regulatory Commission might take in keeping with its regulatory functions and its mission to protect the public health and safety

  4. Plasma-assisted cleanup of flue gas. [Quarterly] technical report, March 1, 1993--May 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Dhali, S.K. [Southern Illinois Univ., Carbondale, IL (United States). Dept. of Electrical Engineering

    1993-09-01

    The objective of the proposed research is to design and implement a novel scheme for the combined removal of SO{sub 2} and NO{sub x} using a dielectric-barrier discharge in conjunction with UV irradiation. This investigation requires the design of a dielectric-barrier reactor and testing the proposed scheme under different conditions. The testing of the uniformity of the discharge with UV irradiation has been very successful. The details are provide-din this report and has been submitted to the Applied Physics Letter. In this reporting period both experimental and simulation work were carried out on the removal of SO{sub 2} and NO{sub x}. With the improved reactor, we have achieved a removal of SO{sub 2} up to 85%. The simulation studies indicate that complete removal of NO{sub x} is possible at reduced electric fields (E/N) of above 100 Td.

  5. Technical basis for EPA's proposed regulation on the cleanup of sites contaminated with radioactivity

    International Nuclear Information System (INIS)

    The US Environmental Protection Agency is proposing a regulation for the protection of the public and radioactive contamination at sites that are to be cleaned up and released for public use. The rule will apply to sites under the control of Federal agencies, and will impose limits on radiation doses to individuals living or working on a site following cleanup; it will thereby provide site owners and managers with uniform, consistent cleanup criteria for planning and carrying out remediation. This paper presents an overview of EPA's approach to assessing some of the beneficial and adverse effects associated with various possible values for the annual dose limit. In particular, it discusses the method developed to determine how the choice of cleanup criterion affects (1) the time-integrated potential numbers of non-fatal and fatal radiogenic cancers averted among future populations, (2) the occurrence of radiogenic cancers among remediation workers and the public caused by the cleanup process itself, and (3) the volumes of contaminated soil that may require remediation. The analytic methods described here were used to provide input data and assumptions for the Regulatory Impact Analysis (RIA) that supports the proposed regulation; the RIA also considered non-radiological benefits and costs (i.e., public health, economic, and ecological) of the standards. 56 refs., 4 figs., 6 tabs

  6. PFBC HGCU Test Facility. Technical progress report: Third Quarter, CY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the sixteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC (pressurized fluidized-bed combustion) Hot Gas Clean Up Test Facility (HGCU). This report covers the period of work completed during the Third Quarter of CY 1993. During this quarter, the Advanced Particle Filter (APF) was operated for a total of 1295 hours. This represents 58% availability during July, August, September, and including June 30 of the previous quarter. The operating dates and times since initial operation are summarized. The APF operating temperatures and differential pressures are provided. Details of the APF runs during this quarter are included in this report.

  7. Regulatory and technical reports: (Abstract index journal). Compilation for first quarter 1997, January--March

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation is published quarterly and cummulated annually. Reports consist of staff-originated reports, NRC-sponsored conference reports, NRC contractor-prepared reports, and international agreement reports

  8. Regulatory and technical reports: (Abstract index journal). Compilation for first quarter 1997, January--March

    Energy Technology Data Exchange (ETDEWEB)

    Sheehan, M.A.

    1997-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation is published quarterly and cummulated annually. Reports consist of staff-originated reports, NRC-sponsored conference reports, NRC contractor-prepared reports, and international agreement reports.

  9. quarters

    Directory of Open Access Journals (Sweden)

    Elena Grigoryeva

    2016-12-01

    Full Text Available Are there many words combining both space and time? A quarter is one of such rare words: it means both a part of the city space and a period of the year. A regular city has parts bordered by four streets. For example, Chita is a city with an absolutely orthogonal historical center. This Utopian city was designed by Decembrists in the depth of Siberian ore-mines (120. The 130 Quarter in Irkutsk is irregular from its inception because of its triangular form. Located between two roads, the forked quarter was initially bordered by flows along the west-east axis – the main direction of the country. That is why it appreciated the gift for the 350 anniversary of its transit existence – a promenade for an unhurried flow of pedestrians. The quarter manages this flow quite well, while overcoming the difficulties of new existence and gathering myths (102. Arousing many expectations, the “Irkutsk’s Quarters” project continues the theme that was begun by the 130 Quarter and involved regeneration, revival and search for Genius Loci and the key to each single quarter (74. Beaded on the trading axis, these shabby and unfriendly quarters full of rubbish should be transformed for the good of inhabitants, guests and the small business. The triptych by Lidin, Rappaport and Nevlyutov is about happiness of urbanship and cities for people, too (58. The City Community Forum was also devoted to the urban theme (114. Going through the last quarter of the year, we hope that Irkutsk will keep to the right policy, so that in the near future the wooden downtown quarters will become its pride, and the design, construction and investment complexes will join in desire to increase the number of comfortable and lively quarters in our city. The Baikal Beam will get one more landmark: the Smart School (22 for Irkutsk’s children, including orphans, will be built in several years on the bank of Chertugeevsky Bay.

  10. Mechanism for Clastogenic Activity of Naphthalene. Quarterly Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Buchholz, B. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-02-05

    The project has two main goals: 1) Identify the types of adducts naphthalene (NA) forms with DNA and 2) determine whether adduct formation correlates with site selective tumor formation in defined subcompartments of the respiratory tract (respiratory and olfactory nasal epithelium and airways of mice, rats and rhesus monkeys). Five tasks are associated with the completion of the goals. Task 1: Contracting and Animal Use Approvals. IACUC and ACURO approvals are complete. The subcontract with UC Davis (UCD) was executed in December 2014. Task 2: Perform In Vitro Study for Goal 1. Rat and mouse samples exposures completed. Monkey samples need to be exposed in next quarter. Task 3: Perform In Vitro Study for Goal 2. Mouse and rat ex vivo exposures completed. Monkey samples need to be completed in the next quarter. Task 4: Sample Preparation and Analysis. Mouse and Rat Goal 2 samples completed. Monkey samples remain to be done for Goal 2. Rat samples completed for Goal 1. Mouse and Monkey samples for Goal 1 need to be completed. Task 5: Data Interpretation and Reporting. Poster will be presented at 2016 Society of Toxicology Meeting. Outline for paper on adduct formation complete and similar to poster for SOT meeting.

  11. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  12. Quarterly technical progress report, October 1-December 30, 1983

    Energy Technology Data Exchange (ETDEWEB)

    1984-04-01

    Several new initiatives were begun in coal preparation, including a project to develop a liquid CO/sub 2/ coalescence process that will produce a superclean coal containing less than 1% ash. Another new project in this area is focusing on chemical coal cleaning for the removal of harmful trace elements, such as arsenic, lead, and zinc. Milestones were reached in both of our major electron beam flue gas cleanup projects. In the area of coal-water mixtures, our major industrial contracts are now approaching critical milestones. The analysis of our in-house combustion testing of micronized coal-water mixtures in PETC's 700-horsepower oil-designed boiler has been completed. By reducing the coal particle size from 90% minus 200 mesh down to 87% minus 19 microns, the carbon conversion efficiency increased from a level of 96% to 98%. Combustion tests with a commercially available CWM showed that combustion air enriched to 23% oxygen reduced the needed air preheat temperature from 370/sup 0/ to 200/sup 0/F. Work also got underway in the new projects selected last summer to investigate advanced direct liquefaction processes. At Kerr-McGee, three scoping runs on their 350 pound/day integrated bench-scale unit were successfully completed. The objective of these runs was to evaluate subbituminous coal process options in terms of catalyst performance, distillate yields, and generation of coke precursors. Cities Service began its project on the characterization of hydrogen donor solvents in two-stage liquefaction. 7 figures, 33 tables.

  13. Regulatory and technical reports. Compilation for second quarter 1982, April to June

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, and NUREG/CR-XXXX. A detailed explanation of the entries precedes each index

  14. Central receiver solar thermal system. Phase 1, CDRL item 10. Second quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1976-04-01

    Results of analysis and design efforts are summarized. This is the second quarterly technical progress report published on the Phase 1 Central Receiver Solar Thermal Power System contract. The dominant activities during the reporting period have involved the detailed definition of the subsystem research experiments and the design of the test articles and test facilities. Summaries of these activities are presented. Design changes to the 10-MWe pilot plant preliminary design baseline which have occurred during the report period are also described.

  15. Quarterly technical progress report, February 1, 1996--April 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-28

    This report from the Amarillo National REsource Center for PLutonium provides research highlights and provides information regarding the public dissemination of information. The center is a a scientific resource for information regarding the issues of the storage, disposition, potential utilization and transport of plutonium, high explosives, and other hazardous materials generated from nuclear weapons dismantlement. The center responds to informational needs and interpretation of technical and scientific data raised by interested parties and advisory groups. Also, research efforts are carried out on remedial action programs and biological/agricultural studies.

  16. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  17. Thermoelectric materials evaluation program. Quarterly technical task report No. 46

    International Nuclear Information System (INIS)

    This forty-sixth Technical Task Report prepared under contract E(11-1)-2331 with the U.S. AEC and U.S. ERDA covers the performance period from October 1, 1975, to December 31, 1975. Highlights include the following tasks: N-type material development (material synthesis--gadolinium selenide compositions; material analyses; material processing; element contacting; ingradient compatibility and life testing; mechanical property characterization), TPM-217 P-type characterization (material preparation and analyses; element contacting; thermodynamic stability; isothermal chemical compatibility; ingradient compatibility and ingradient life testing; performance mapping of contacted and noncontacted elements; high-temperature partitioned P-legs), couple development (design and development of TPM-217/gadolinium selenide rare earth chalcogenide couple; design and development of TPM-217/3N-PbTe couples; advanced generator concepts), module development, liaison with Jet Propulsion Laboratory and material supply, liaison with GGA, and program management. 24 figures, 27 tables

  18. PFBC HGCU test facility technical progress report. First Quarter, CY 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This is the eighteenth Technical Progress Report submitted in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. During this quarter, the Tidd Hot Gas Clean Up System operated for 835 hours during six separate test runs. The system was starting into a seventh run at the end of the quarter. Highlights of this period are summarized below: the longest run during the quarter was approximately 333 hours; filter pressure drop was stable during all test runs this quarter using spoiling air to the primary cyclone upstream of the Advanced Particle Filter (APF); the tempering air system was commissioned this quarter which enabled the unit to operate at full load conditions while limiting the gas temperature in the APF to 1,400 F; during a portion of the one run, the tempering air was removed and the filter operated without problems up to 1,450 F; ash sampling was performed by Battelle personnel upstream and downstream of the APF and ash loading and particle size distribution data were obtained, a summary report is included; a hot area on the APF head was successfully repaired in service; a hot spot on the top of an expansion joint was successfully repaired by drilling holes from the inside of the pipe and pumping in refractory insulation; a corrosion inspection program for the HGCU system was issued giving recommendations for points to inspect; filter internal inspections following test runs 13 and 17 revealed a light coating (up to 1/4 inch thick) of residual ash on the candles and some ash bridging between the dust sheds and inner rows of candles. Data from these inspections are included with this report.

  19. Regulatory and technical reports: compilation for third quarter 1982 July-September

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, and NUREG/CR-XXXX. This precede the following indexes: Contractor Report Number Index; Personal Author Index; Subject Index; NRC Originating Organization Index (Staff Reports); NRC Contract Sponsor Index (Contractor Reports); Contractor Index; and Licensed Facility Index

  20. Projects at the component development and integration facility. Quarterly technical progress report, April 1, 1994--June 30, 1994

    International Nuclear Information System (INIS)

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY94. The CDIF is a major Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; and Spray Casting Project

  1. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  2. Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually.

  3. Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  4. Quarterly technical progress report for the period ending June 30, 1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The Magnetohydrodynamics Program (Component Development and Integration Facility) in Butte, Montana, continued its site preparation for the TRW first-stage combustor installation. In the area of flue gas cleanup, our in-house research program is continuing its investigation into the causes of sorbent attrition in PETC's fluidized-bed copper oxide process for simultaneous SO/sub 2//NO/sub x/ removal. Interwoven with these tests is a series of spray dryer/electrostatic precipitator tests that are being conducted with the cooperation of Wheelabrator-Frye, Inc. This test series was completed this quarter, and the data show that when using a Kentucky coal, Wheelabrator-Frye's electrostatic precipitator provides excellent particulate control efficiency while using a spray dryer for sulfur dioxide removal. A unique project at Carnegie-Mellon University is looking at the concept of integrated environmental control for coal-fired power plants making use of precombustion, combustion, and postcombustion control, including systems for the simultaneous removal of more than one pollutant. The objective of this research is to develop a computer model and assessment for integrated environmental control systems that utilize conventional or advanced systems. The Liquid Phase Methanol Project Development Unit in LaPorte, Texas, was restarted after a successful shakedown run was completed. PETC has recently begun an in-house research project aimed at exploring the basic chemistry of liquefying coal in the presence of water under supercritical conditions. In the Alternative Fuels Technology Program, the Gulf Research and Development Company has completed the preliminary testing phase of its erosion test loop. Their results indicate that when pumping a coal-water slurry fuel through a flow loop, the erosion rate increases as velocity increases, suggesting a well-defined relationship between these two parameters.

  5. Healy clean coal project: Technical progress report. Quarterly report number 14, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The primary objective of the HCCP is to demonstrate a new power plant design integrating an advanced combustor and heat recovery system coupled with both high and low temperature emission control processes. Alaskan bituminous and subbituminous coals will be the fuels. Emissions of SO{sub 2} and NO{sub x} from the plant will be controlled using a slagging coal combustor with limestone injection, in conjunction with a boiler. Further SO{sub 2} and particulate removal will be accomplished using an Activated Recycle Spray Absorber System. Environmental efforts during this quarter concentrated on supporting the Alaska Department of Environmental Conservation`s (ADEC) insurance of the Final Prevention of Significant Deterioration (PSD)/Permit to Operate, preparation of post-construction Air Quality Monitoring and Visibility Monitoring Plans, preparation of a General Wastewater Discharge Permit Application for disposal of wastewater from on-site excavations, review of a PreDraft National Pollutant Discharge Elimination System (NPDES) Permit and Fact Sheet and discussions with the Environmental Protection Agency (EPA) and ADEC on NPDES Permit limitations, and preparation of a draft Storm Water Pollution Prevention Plan for HCCP construction. The final PSD/Permit to Operate No. 9431-AA001 and Technical Analysis Report (TAR) was issued on May 12, 1994. Finalization of engineering and design continued on the boiler, combustors, flue gas desulfurization (FGD), and turbine/generator systems and balance of plant.

  6. MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  7. MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

  8. Decontamination Systems Information and Research Program. Quarterly technical progress report, July 1--September 30, 1993

    International Nuclear Information System (INIS)

    Progress reports are presented for the following projects: systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies--drain-enhanced soil flushing (DESF) for organic contaminants removal; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors--monolayer and multilayer self-assembled films for chemical sensors; Winfield Lock and Dam remediation; Winfield cleanup survey; assessment of technologies for hazardous waste site remediation--non-treatment technologies and pilot scale test facility implementation; assessment of environmental remediation storage technology; assessment of environmental remediation excavation technology; assessment of environmental remediation monitoring technology; and remediation of hazardous sites with steam reforming

  9. Decontamination Systems Information and Research Program. Quarterly technical progress report, July 1--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    Progress reports are presented for the following projects: systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies--drain-enhanced soil flushing (DESF) for organic contaminants removal; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors--monolayer and multilayer self-assembled films for chemical sensors; Winfield Lock and Dam remediation; Winfield cleanup survey; assessment of technologies for hazardous waste site remediation--non-treatment technologies and pilot scale test facility implementation; assessment of environmental remediation storage technology; assessment of environmental remediation excavation technology; assessment of environmental remediation monitoring technology; and remediation of hazardous sites with steam reforming.

  10. [National Institute for Petroleum and Energy Research] quarterly technical report, October 1--December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    Accomplishments for the past quarter are described for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and microbial technology.

  11. Power systems development facility. Quarterly technical progress report, July 1, 1994--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  12. Advanced liquefaction using coal swelling and catalyst dispersion techniques. Quarterly technical progress report, April--June 1992

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, C.W. [Auburn Univ., AL (United States); Gutterman, C. [Foster Wheeler Development Corp., Livingston, NJ (United States); Chander, S. [Pennsylvania State Univ., University Park, PA (United States)

    1992-08-26

    Research in this project centers upon developing a new approach to the direct liquefaction of coal to produce an all-distillate product slate at a sizable cost reduction over current technology. The approach integrates all aspects of the coal liquefaction process including coal selection, pretreatment, coal swelling with catalyst impregnation, coal liquefaction experimentation, product recovery with characterization, alternate bottoms processing, and a technical assessment including an economic evaluation. The project is being carried out under contract to the United States Department of Energy. On May 28, 1992, the Department of Energy authorized starting the experimental aspects of this projects; therefore, experimentation at Amoco started late in this quarterly report period. Research contracts with Auburn University, Pennsylvania State University, and Foster Wheeler Development Corporation were signed during June, 1992, so their work was just getting underway. Their work will be summarized in future quarterly reports. A set of coal samples were sent to Hazen Research for beneficiation. The samples were received and have been analyzed. The literature search covering coal swelling has been up-dated, and preliminary coal swelling experiments were carried out. Further swelling experimentation is underway. An up-date of the literature on the liquefaction of coal using dispersed catalysts is nearing completion; it will be included in the next quarterly report.

  13. Bench-scale testing of the micronized magnetite process. Second quarterly technical progress report, October 1994--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-19

    This document contains the Quarterly Technical Progress Report for the Micronized Magnetite Testing Project being performed at PETC`s Process Research Facility (PRF). This second quarterly report covers the period from October, 1994 through December, 1994. The main accomplishments of Custom Coals and the project subcontractors, during this period, included: (1) Submitted all overdue project documents and kept up with routine reporting requirements; (2) Worked with CLI Corporation, the design subcontractor, and completed the circuit design and finalized all design drawings; (3) Specified and procured all of the process equipment for the circuit, as well as a number of ancillary equipment, instruments, and supplies; (4) Assisted Vangura Iron Inc. in detailing and constructing the structural and platework steel; (5) Subcontracted Rizzo & Sons to perform the circuit mechanical and electrical installation, and prepared for January 23rd installation start date; (6) Organized and prepared for coal and magnetite procurement; (7) Specified and organized an operating personnel plan for the commissioning and testing tasks in the project; (8) Assessed analytical challenges for project, and began to research problem areas. This report contains a short discussion of the project description, objectives, budget, schedule, and teaming arrangement. It also includes a detailed discussion of the abovementioned project accomplishments and plans, organized by the various task series within the project work plan. The final section contains an outline of the specific project goals for the next quarterly reporting period.

  14. Liquid fossil-fuel technology. Quarterly technical progress report, January-March 1983

    Energy Technology Data Exchange (ETDEWEB)

    Linville, B. (ed.)

    1983-07-01

    Accomplishments for the quarter ending March 1983 are presented under the following headings: liquid fossil fuel cycle, processing, utilization, and project integration and technology transfer. Feature articles for this quarter are: (1) abandoned oil field reports issued; (2) oilfield water data bank report published; (3) microbial enhanced recovery report issued; (4) polymer-augmented project could be economic today; (5) carbon dioxide EOR estimates given; (6) BETC passes 65th milestone; and (7) fifty achievements for fifty years (1918-1968). BETC publications are also listed. (ATT)

  15. Management of dry flue gas desulfurization by-products in underground mines. Quarterly technical progress report, April 1995--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    Chugh, Y.P.; Dutta, D.; Esling, S. [and others

    1995-07-01

    On September 30, 1993, the U.S. Department of Energy-Morgantown Energy Technology Center and Southern Illinois University at Carbondale (SIUC) entered into a cooperative research agreement entitled {open_quotes}Management of Dry Flue Gas Desulfurization By-Products in Underground Mines{close_quotes} (DE-FC21-93MC30252). Under the agreement Southern Illinois University at Carbondale will develop and demonstrate several technologies for the placement of coal combustion residues in abandoned coal mines, and will assess the environmental impact of such underground residues placement. Previous quarterly Technical Progress Reports have set forth the specific objectives of the program, and a discussion of these is not repeated here. Rather, this report discusses the technical progress made during the period April 1 - June 30, 1995. A final topical report on the SEEC, Inc. demonstration of its technology for the transporting of coal combustion residues was completed during the quarter, although final printing of the report was accomplished early in July, 1995. The SEEC technology involves the use of Collapsible Intermodal Containers (CIC`s) developed by SEEC, and the transportation of such containers - filled with fly ash or other coal combustion residues - on rail coal cars or other transportation means. Copies of the final topical report, entitled {open_quotes}The Development and Testing of Collapsible Intermodal Containers for the Handling and Transport of Coal Combustion Residues{close_quotes} were furnished to the Morgantown Energy Technology Center. The Rapid Aging Test colums were placed in operation during the quarter. This test is to determine the long-term reaction of both the pneumatic and hydraulic mixtures to brine as a leaching material, and simulates the conditions that will be encountered in the actual underground placement of the coal combustion residues mixtures. The tests will continue for about one year.

  16. Amarillo National Resource Center for Plutonium quarterly technical progress report, August 1, 1997--October 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This report summarizes activities of the Amarillo National Resource Center for Plutonium during the quarter. The report describes the Electronic Resource Library; DOE support activities; current and future environmental health and safety programs; pollution prevention and pollution avoidance; communication, education, training, and community involvement programs; and nuclear and other material studies, including plutonium storage and disposition studies.

  17. Projects at the Western Environmental Technology Office. Quarterly technical progress report, January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This quarterly report briefly describes recent progress in eight projects. The projects are entitled Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Spray Casting Project; and Watervliet Arsenal Project.

  18. PFBC HGCU Test facility. Technical progress report, Fourth quarter, CY 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    During this quarter, the Tidd Hot Gas Clean Up System completed a 691-hour test run which began during the third quarter. Table 1 summarizes all test runs since initial operation. Following this test run the system was shut down and the filter opened for inspection and recandling. The system remained out of service during the remainder of the quarter. In addition to monitoring and evaluating the performance of the HGCU system during testing, engineering effort was devoted to posttest inspection of the APF (Advanced Particle Filter) and evaluation of the effects of totally spoiling the primary cyclone. In addition, the authors worked with Westinghouse in the selection of replacement candles that were installed during the fourth quarter. During the unit outage this quarter, the primary cyclone upstream of the APF was modified to force all of the ash to pass through the cyclone and enter the APF without using spoiling air. Appendices to this report describe the dust shroud support strap design; an analysis of the effect of support-transferred vibrations on the failure of ceramic candle filters; the Tidd APF operation; the Tidd APF boroscope inspection; a general inspection of Tidd filter internals; tally of Tidd filters; ash formations in the W-APF-October 1994 post-test inspection; characterization of the as-manufactured and PFBC-exposed 3M CVI-SiC composite filter matrix; strength characterization of the first and second generation candle filters after 1,705 hours of PFBC operation at Tidd; and filters used in the December 1994 recandling effort at Tidd.

  19. [Geothermal system temperature-depth database and model for data analysis]. 5. quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Blackwell, D.D.

    1998-04-25

    During this first quarter of the second year of the contract activity has involved several different tasks. The author has continued to work on three tasks most intensively during this quarter: the task of implementing the data base for geothermal system temperature-depth, the maintenance of the WWW site with the heat flow and gradient data base, and finally the development of a modeling capability for analysis of the geothermal system exploration data. The author has completed the task of developing a data base template for geothermal system temperature-depth data that can be used in conjunction with the regional data base that he had already developed and is now implementing it. Progress is described.

  20. Automotive stirling engine development program. Quarterly technical progress report, April 1978--June 1978

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    The report covers the third quarter (April--June, 1978) effort of the Ford/DOE Automotive Stirling Engine Development Program, specifically Task I of that effort which is Fuel Economy Assessment. At the end of the previous quarter (March 31, 1978) the total fourth generation fuel economy projection was 23.7 mpg with a confidence level of 40%. At the end of this quarter (June 30, 1978) the total fourth generation fuel economy projection was 26.12 mpg with a confidence level of 44%. This represents an improvement of 66.4% over the baseline M-H fuel economy of 15.7 mpg. The confidence level for the original 20.6 mpg goal has been increased from 53 to 57%. Engine 3X17 has now accumulated a total of 213 h of variable speed running. A summary of the individual sub-tasks of Task I is presented. The sub-tasks are grouped into two categories: Category 1 consists of those sub-tasks which are directly related to fuel economy and Category 2 consists of those sub-tasks which are not directly related to fuel economy but are an integral part of the Task I effort.

  1. Innovative technologies for groundwater cleanup

    International Nuclear Information System (INIS)

    These notes provide a broad overview of current developments in innovative technologies for groundwater cleanup. In this context, groundwater cleanup technologies include site remediation methods that deal with contaminants in ground water or that may move from the vadose zone into ground water. This discussion attempts to emphasize approaches that may be able to achieve significant improvements in groundwater cleanup cost or effectiveness. However, since data for quantitative performance and cost comparisons of new cleanup methods are scarce, preliminary comparisons must be based on the scientific approach used by each method and on the site-specific technical challenges presented by each groundwater contamination situation. A large number of technical alternatives that are now in research, development, and testing can be categorized by the scientific phenomena that they employ and by the site contamination situations that they treat. After reviewing a representative selection of these technologies, one of the new technologies, the Microbial Filter method, is discussed in more detail to highlight a promising in situ groundwater cleanup technology that is now being readied for field testing

  2. Innovative technologies for soil cleanup

    International Nuclear Information System (INIS)

    These notes provide a broad overview of current developments in innovative technologies for soil cleanup. In this context, soil cleanup technologies include site remediation methods that deal primarily with the vadose zone and with relatively shallow, near-surface contamination of soil or rock materials. This discussion attempts to emphasize approaches that may be able to achieve significant improvements in soil cleanup cost or effectiveness. However, since data for quantitative performance and cost comparisons of new cleanup methods are scarce, preliminary comparisons must be based on the scientific approach used by each method and on the sits-specific technical challenges presented by each sold contamination situation. A large number of technical alternatives that are now in research, development, and testing can be categorized by the scientific phenomena that they employ and by the site contamination situations that they treat. After cataloging a representative selection of these technologies, one of the new technologies, Dynamic Underground Stripping, is discussed in more detail to highlight a promising soil cleanup technology that is now being field tested

  3. Regulatory and technical reports (abstract index journal): Compilation for third quarter 1994, July--September. Volume 19, Number 3

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issues by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, NUREG/CR-XXXX, and NUREG/IA-XXXX. These precede the following indexes: Secondary Report Number Index, Personal Author Index, Subject Index, NRC Originating Organization Index (Staff Reports), NRC Originating Organization Index (International Agreements), NRC Contract Sponsor Index (Contractor Reports) Contractor Index, International Organization Index, Licensed Facility Index. A detailed explanation of the entries precedes each index

  4. Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly technical progress report No. 4

    Energy Technology Data Exchange (ETDEWEB)

    Smit, F.J.; Hogsett, R.F.; Jha, M.C.

    1993-11-04

    This project is a major step in the Department of Energy`s program to show that ultra-clean coal-water slurry fuel (CWF) can be produced from selected coals and that this premium fuel will be a cost-effective replacement for oil and natural gas now fueling some of the industrial and utility boilers in the United States. The replacement of oil and gas with CWF can only be realized if retrofit costs are kept to a minimum and retrofit boiler emissions meet national goals for clean air. These concerns establish the specifications for maximum ash and sulfur levels and combustion properties of the CWF. This cost-share contract is a 48-month program which started on September 30, 1992. This report discusses the technical progress made during the 4th quarter of the project from July 1 to September 30, 1993.

  5. Regulatory and technical reports (abstract index journal): Compilation for third quarter 1996 July--September. Volume 21, Number 3

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, NUREG/CR-XXXX, and NUREG/IA-XXXX. These precede the following indexes: secondary report number index; personal author index; subject index; NRC originating organization index (staff reports); NRC originating organization index (international agreements); NRC contract sponsor index (contractor reports); contractor index; international organization index; and licensed facility index. A detailed explanation of the entries precedes each index

  6. Regulatory and technical reports (abstract index journal): Compilation for third quarter 1996 July--September. Volume 21, Number 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, NUREG/CR-XXXX, and NUREG/IA-XXXX. These precede the following indexes: secondary report number index; personal author index; subject index; NRC originating organization index (staff reports); NRC originating organization index (international agreements); NRC contract sponsor index (contractor reports); contractor index; international organization index; and licensed facility index. A detailed explanation of the entries precedes each index.

  7. Regulatory and technical reports (abstract index journal): Compilation for third quarter 1994, July--September. Volume 19, Number 3

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-12-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issues by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, NUREG/CR-XXXX, and NUREG/IA-XXXX. These precede the following indexes: Secondary Report Number Index, Personal Author Index, Subject Index, NRC Originating Organization Index (Staff Reports), NRC Originating Organization Index (International Agreements), NRC Contract Sponsor Index (Contractor Reports) Contractor Index, International Organization Index, Licensed Facility Index. A detailed explanation of the entries precedes each index.

  8. Environmental Hazards Assessment Program. Quarterly report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-04

    The objectives of the EHAP program are to: Develop a holistic, national basis for risk assessment, risk management and risk communication; Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and; Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter of year two (January-March, 1994) of the grant. To better accomplish objectives, grant efforts are organized into three major elements: The Crossroads of Humanity Series; Research, Science and Education Programs; and Program Management. The Crossroads of Humanity Series charted a new course, incorporating lessons learned during previous quarters into a series of programs designed to address environmental issues in a real world setting. Reports are included on the various research programs with milestones and deliverables from the third quarter.

  9. Nucla circulating atmospheric fluidized bed demonstration project. Quarterly technical progress report, October--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  10. Salt Repository Project technical progress report for the quarter 1 January--31 March 1987

    International Nuclear Information System (INIS)

    This document reports the progress being made each quarter on the development of a geologic repository in salt for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Nuclear Waste Isolation, a prime contractor of the US Department of energy (DOE) Salt Repository Project Office. The studies include work by other DOE prime contractors and by contractors to the Office of Nuclear Waste Isolation. 23 refs., 1 fig

  11. Salt repository project: Technical progress report for the quarter 1 April--30 June 1987

    International Nuclear Information System (INIS)

    This document reports the progress being made each quarter on the development of a geologic repository in salt for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Nuclear Waste Isolation, a prime contractor of the US Department of Energy (DOE) Salt Repository Project Office. The studies include work by other DOE prime contractors and by contractors to the Office of Nuclear Waste Isolation

  12. NST Quarterly

    International Nuclear Information System (INIS)

    NST Quarterly reports current development in nuclear science and technology in Malaysia. It keeps readers informed on the progress of research, services, application of nuclear science and technology, and other technical news. It highlights MINT activities and also announces coming events

  13. University of Tennessee Space Institute. Quarterly technical progress report, April-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    1984-05-01

    The major activities discussed in this quarterly report are concerned with the initiation of testing in the DOE Coal Fired Flow Facility in the LMF1D test series. This test series is designed to provide basic data on seed/slag interaction as a function of diffuser exit temperature and slag carryover rate for the coal fired MHD system with slag screen installed. During the quarter two shakedown tests and three tests in the test series were conducted. Data is reported on the flow train performance, including the combustor, the slag screen, radiant furnace and the materials test module. Analysis of data from the LMF1C test series continues and a summary of the NO/sub x/ data analysis is provided. A summary of the results of application of advanced diagnostic equipment provided by UTSI, Mississippi State University and the Babcock and Wilcox Company is included. In Task 2 the arrival on site of the low temperature air heater is reported. A progress report on the procurement, engineering and installation of the superheater components is included.

  14. Products of motor burnout. Second quarterly technical report, October 1, 1994--December 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hawley-Fedder, R.

    1995-01-15

    The OSP (Operating Safety Procedure) required for performance of electrical arc testing of CFC replacement fluids was renewed. Electrical breakdown tests at one atmosphere pressure have been performed for R-22, R-134a, and R-125/R-143a (50:50 blend; R-507), and breakdown products identified. No differences in HCFC breakdown products are seen in the presence or absence of lubricant oils. The design of the high pressure-high temperature test stand has been finalized, and construction initiated during this quarter. Three motor stators and rotors were received from Tecumseh Products Company for use in motor burnout tests. A test plan for the motor breakdown tests is in preparation.

  15. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    International Nuclear Information System (INIS)

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations

  16. Technical progress report for the quarter 1 October-31 December 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    This report describes the technical accomplishments on the commercial nuclear waste management programs and on the geologic disposal of nuclear wastes. The program is organized into eight tasks: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management. (DLC)

  17. Technical progress report for the quarter 1 October-31 December 1980

    International Nuclear Information System (INIS)

    This report describes the technical accomplishments on the commercial nuclear waste management programs and on the geologic disposal of nuclear wastes. The program is organized into eight tasks: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management

  18. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, May 1--July 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Progress is reported on research projects related to the following: Electronic resource library; Environment, safety, and health; Communication, education, training, and community involvement; Nuclear and other materials; and Reporting, evaluation, monitoring, and administration. Technical studies investigate remedial action of high explosives-contaminated lands, radioactive waste management, nondestructive assay methods, and plutonium processing, handling, and storage.

  19. GBRN/DOE Project: Dynamic enhanced recovery technologies. Quarterly technical report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.N.

    1994-04-15

    Global Basins Research Network will perform a field demonstration of their ``Dynamic Enhanced Recovery Technology`` to test the concept that the growth faults in EI-330 field are conduits through which producing reservoirs are charged and that enhanced production can be developed by producing directly from the fault zone. The site, operated by Penzoil, is located in 250 feet of water the productive depth intervals include 4000 to 9000 feet. Previous work, which incorporated pressure, temperature, fluid flow, heat flow, seismic, production, and well log data, indicated active fluid flow along fault zones. The field demonstration will be accomplished by drilling and production test of growth fault systems associated with the EI-330 field. The project utilizes advanced 3-D seismic analysis, geochemical studies, structural and stratigraphic reservoir characterization, reservoir simulation, and compact visualization systems. The quarterly progress reports contains accomplishments to date for the following tasks: Management start-up; database management; field and demonstration equipment; reservoir characterization, modeling; geochemistry; and data integration.

  20. Microwave plasma source for neutral-beam injection systems. Quarterly technical progress report

    International Nuclear Information System (INIS)

    The overall program is described and the technical and programmatic reasons for the decision to pursue both the RFI and ECH sources into the current hydrogen test stage is discussed. We consider the general characteristics of plasma sources in the parameter regime of interest for neutral beam applications. The operatonal characteristics, advantages and potential problems of RFI and ECH sources are discussed. In these latter two sections we rely heavily on experience derived from developing RFI and ECH ion engine sources for NASA

  1. I-NERI QUARTERLY TECHNICAL PROGRESS REPORT - JANUARY 1 - MARCH 31, 2005

    International Nuclear Information System (INIS)

    The objective of this Korean/United States/laboratory/university collaboration is to develop new advanced computational methods for safety analysis codes for very-high-temperature gas-cooled reactors (VHTGRs) and numerical and experimental validation of these computer codes. The research will improve two well-respected light water reactor transient response codes (RELAP5/ATHENA and MELCOR) in the modeling of molecular diffusion and chemical equilibrium, and to validate these codes against the VHTGR accident data, i.e., air ingress and others from the literature. The VHTGR is intrinsically safe, has a proliferation-resistant fuel cycle, and many advantages relative to light water reactors (LWRs). This study consists of five tasks for FY-03: (1) development of computational methods for the VHTGR, (2) theoretical modification of aforementioned computer codes for molecular diffusion (RELAP5/ATHENA) and modeling CO and CO2 equilibrium (MELCOR), (3) development of a state-of-the-art methodology for VHTGR neutronic analysis and calculation of accurate power distributions and decay heat deposition rates, (4) reactor cavity cooling system experiment, and (5) graphite oxidation experiment. First quarter of Year 3: (A) Prof. NO and Kim continued Task 1. We first performed the chemical reaction test for the VELUNA pebble oxidation experiment and then the analysis of the air ingress accident for PBMR 268MWt. In the GAMMA analysis, significant rise in pebble temperature was observed at the bottom of the core due to graphite oxidation. Since the air ingress process depends on the vault conditions, further analysis coupled with more detailed vault or containment modeling would be necessary as a future study. (B) Prof. Park continued Task 2. The experiments for SNU-RCCS were continued to provide the experimental data for the validation of the thermal hydraulic code being developed at KAIST and to evaluate the performance of the system using the experiments and system analysis codes

  2. Exxon catalytic coal gasification process development program. Quarterly technical progress report, January 1-March 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    This report covers the activites for the Exxon Catalytic Coal Gasification Development Program during the quarter January 1-March 31, 1979. Construction of a bench apparatus to study reactions of product and recycle gas in furnace and heat exchanger tubes was completed and checkout of the apparatus was begun. A Startup and Initial Operation Schedule, a Checkout Test Plan, and an Initial Startup Plan were developed for the Process Develoment Unit (PDU). The PDU will be started up in a sequential manner, with the gasification system being started up on a once-through basis first. The gas separation system will be started up next, followed by the catalyst recovery system. The programmable controller, which handles valve sequencing, alarming, and other miscellaneous functions on the PDU, was programmed and checkout was completed on the coal feed, gas feed, and filter systems. Work continued on defining the cause of the breakdown of char and lime during digestion in the prototype catalyst recovery unit. It was concluded that both the lime and char particles are fragile and will break down to fines if handled roughly. Removal of the potassium from the char by water washing does not cause the char particles to disintegrate. The perferred processing sequence for catalyst recovery in the PDU has been identified. Bench scale tests confirmed that the change in catalyst from K/sub 2/CO/sub 3/ to KOH was not responsible for the differences in fluidized bed densities between the present and the predevelopment operations of the FBG. Work was completed on a revised offsites facilities definition and cost estimate to update the CCG Commercial Plant Study Design prepared during the predevelopment program.

  3. Methane coupling by membrane reactor. Quarterly technical progress report, September 25, 1995--December 24, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-15

    The performance of the third type of catalytic membrane reactor configuration, with catalyst deposited in the membrane and no catalyst or inert materials in the tube side, was evaluated. The C{sub 2} selectivity obtained was about 10% due to the gas phase reaction in the empty tube side of the reactor. The membrane reactor with an oxygen-permeable dense membrane has been built. The use of a dense membrane will eliminate the loss of hydrocarbon from the tube side to the shell side, as observed in the Vycor glass membrane reactor. Also, air can be used as the oxygen source without contaminating the product. La/MgO was synthesized and will be used as the catalyst for the dense membrane reactor. This catalyst was reported in the literature to show significant improvement of C{sub 2} selectivity and yield for oxidative coupling of methane in a packed-bed reactor by using the operation mode of staged-feed of oxygen. A reactor mode for methane oxidative coupling in reactors with both distributed oxygen feed and C{sub 2} product removal was developed based on the general model of cross-flow reactors reported in the last quarterly report. A distributed oxygen feed could give rise to much higher C{sub 2} yield than the co-feed reactor as long as the space time is long enough. In the case of a two-membrane reactor, where oxygen is supplied by one membrane and products are removed through the other membrane, a high separation factor of C{sub 2} product to methane for the product-removal membrane is critical to achieve high C{sub 2} yield.

  4. Solvent refined coal (SRC) process. Quarterly technical progress report, January 1980-March 1980. [In process streams

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    This report summarizes the progress of the Solvent Refined Coal (SRC) project at the SRC Pilot Plant in Fort Lewis, Wahsington, and the Process Development Unit (P-99) in Harmarville, Pennsylvania. After the remaining runs of the slurry preheater survey test program were completed January 14, the Fort Lewis Pilot Plant was shut down to inspect Slurry Preheater B and to insulate the coil for future testing at higher rates of heat flux. Radiographic inspection of the coil showed that the welds at the pressure taps and the immersion thermowells did not meet design specifications. Slurry Preheater A was used during the first 12 days of February while weld repairs and modifications to Slurry Preheater B were completed. Two attempts to complete a material balance run on Powhatan No. 6 Mine coal were attempted but neither was successful. Slurry Preheater B was in service the remainder of the quarter. The start of a series of runs at higher heat flux was delayed because of plugging in both the slurry and the hydrogen flow metering systems. Three baseline runs and three slurry runs of the high heat flux program were completed before the plant was shut down March 12 for repair of the Inert Gas Unit. Attempts to complete a fourth slurry run at high heat flux were unsuccessful because of problems with the coal feed handling and the vortex mix systems. Process Development Unit (P-99) completed three of the four runs designed to study the effect of dissolver L/D ratio. The fourth was under way at the end of the period. SRC yield correlations have been developed that include coal properties as independent variables. A preliminary ranking of coals according to their reactivity in PDU P-99 has been made. Techniques for studying coking phenomenona are now in place.

  5. Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 7, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The purpose of this contract is to develop a process for converting light alkane gases to methyl chloride via oxyhydrochlorination using highly selective, stable catalysts in fixed-bed reactors designed to remove the large amount of heat generated, so as to control the reaction temperature. Further, the objective is to obtain the engineering data base necessary for developing a commercially feasible process and to evaluate the economics of the process. Several key technology areas were evaluated this quarter. The catalyst definition effort focused on the determination of the role of the Li and La promoters that have been found to be useful in enhancing Cu based oxyhydrochlorination of methane catalysts. Initial experiments show that the La acts to provide a much more active catalyst than the Cu only case. The role of the Li is ambiguous at this point. The Li enhances the stability of the La promoted catalyst, but gives only marginal improvement by itself This work will be continued, with additional emphasis on the analysis of the catalysts to determine the structural role that the promoters may play. The separation unit operation definition made significant progress by demonstrating in a laboratory system that a process solvent may be used to remove the product CH{sub 3}Cl from the reactor effluent stream. To date the data has been qualitative, but clear. Work will continue to gather the information possible in the laboratory to help with PDU design. An extensive amount of testing was performed on the chosen process solvent, Multitherm. A comprehensive review of all the thermal testing and associated FTIR, UV/VIS, and physical property testing is included in this report. This work shows that Multitherm should give the desired stability and solubility that are necessary to make the separation unit operation successful.

  6. Bench-scale testing of the micronized magnetite process. Third quarterly technical progress report, January 1995--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-29

    The major focus of the project, which is scheduled to occur through December 1995, will be to install and test a 500{number_sign}/hr. fine-coal cleaning circuit at DOE`s Process Research Facility (PRF), located at the Pittsburgh Energy Technology Center (PETC). The circuit will utilize an extremely fine, micron-sized magnetite media and small diameter cyclones to make efficient density separations on minus-28-Mesh coal. The overall objectives of the project are to: Determine the effects of operating time on the characteristics of the recirculating medium in a continuous integrated processing circuit, and subsequently, the sensitivity of cyclone separation performance to the quality of the recirculating medium; and determine the technical and economic feasibility of various unit operations and systems in optimizing the separation and recovery of the micronized magnetite from the coal products. This report contains a short discussion of the project description, objectives, budget, schedule, and teaming arrangement. The final section contains an outline of the specific project goals for the next quarterly reporting period.

  7. Advanced coal liquefaction research. Quarterly technical progress report, July 1, 1983-September 30, 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-04-01

    Work this quarter focused on staged liquefaction. The effect of residence time on conversion in single pass experiments was found to be quite different for the subbituminous Belle Ayr Mine and bituminous Illinois No. 6 coals studied. With bituminous coal, conversion to soluble material is quite high and the limit of conversion is approached in only a few minutes. With a subbituminous coal, however, conversion is much lower and the limit of conversion is approached much more slowly. Short contact time (SCT) dissolution of Belle Ayr coal was studied as a possible first stage in a two-stage process. Conversion, hydrocarbon gas yield and hydrogen consumption were increased as residence time or temperature were increased. Conversion was also significantly increased by partial slurry recycle. Pyrite was found to be the most effective slurry catalyst for increasing conversion, followed by ammonium molybdate emulsion and finally nickel-molybdenum on alumina. Illinois No. 6 coal was liquefied in two stages. Conditions in the first stage dissolution were varied to determine the effect on upgradability in the second stage. An SCT (6 minute) coal dissolution stage is preferred over one at 30 minutes because hydrocarbon gas yield was much lower while overall oil yields for the combined dissolution and upgrading stages were nearly the same. Use of a NiMo/Al/sub 2/O/sub 3/ catalyst in a trickle-bed second stage resulted in a higher oil yield and lower product heteroatom content than use of the same catalyst in the slurry phase. The total oil yield was lower with a pyrite slurry catalyst than with a NiMo/Al/sub 2/O/sub 3/ slurry catalyst. With Belle Ayr coal and added pyrite, there was no change in total oil yield, conversion or product quality brought about by adding an 8-minute first stage at 450/sup 0/C (842/sup 0/F) to a 2-hour second stage operated at 420/sup 0/C (788/sup 0/F). 39 figures, 12 tables.

  8. I-NERI Quarterly Technical Report (April 1 to June 30, 2005)

    International Nuclear Information System (INIS)

    The objective of this Korean/United States/laboratory/university collaboration is to develop new advanced computational methods for safety analysis codes for very-high-temperature gas-cooled reactors (VHTGRs) and numerical and experimental validation of these computer codes. This study consists of five tasks for FY-03: (1) development of computational methods for the VHTGR, (2) theoretical modification of aforementioned computer codes for molecular diffusion (RELAP5/ATHENA) and modeling CO and CO2 equilibrium (MELCOR), (3) development of a state-of-the-art methodology for VHTGR neutronic analysis and calculation of accurate power distributions and decay heat deposition rates, (4) reactor cavity cooling system experiment, and (5) graphite oxidation experiment. Second quarter of Year 3: (A) Prof. NO and Kim continued Task 1. As a further plant application of GAMMA code, we conducted two analyses: IAEA GT-MHR benchmark calculation for LPCC and air ingress analysis for PMR 600MWt. The GAMMA code shows comparable peak fuel temperature trend to those of other country codes. The analysis results for air ingress show much different trend from that of previous PBR analysis: later onset of natural circulation and less significant rise in graphite temperature. (B) Prof. Park continued Task 2. We have designed new separate effect test device having same heat transfer area and different diameter and total number of U-bands of air cooling pipe. New design has smaller pressure drop in the air cooling pipe than the previous one as designed with larger diameter and less number of U-bands. With the device, additional experiments have been performed to obtain temperature distributions of the water tank, the surface and the center of cooling pipe on axis. The results will be used to optimize the design of SNU-RCCS. (C) Prof. NO continued Task 3. The experimental work of air ingress is going on without any concern: With nuclear graphite IG-110, various kinetic parameters and reaction

  9. Great Plains Coal Gasification Project, Mercer County, North Dakota. Quarterly technical and environmental report, fourth quarter, 1983. [Great Plains, Mercer County, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Activities remain on schedule to meet Great Plains Gasification Associates' full gas production date. Gasification Plant: detailed engineering in the Contractors' home office was completed in the fourth quarter. The remaining engineering tasks, which include field support activities and special projects, will be performed by the Contractors' Field Engineering Group. A substantial amount of construction progress was achieved during the fourth quarter. Although the Plant's construction activities are still slightly behind schedule, it is currently forecasted that the construction schedule will be regained by the end of June 1984. Start-Up operations are continuing at a rapid pace. The current emphasis is on system turnover and commissioning activities. The environmental permitting for the construction phase is complete. Freedom Mine: mine development activities remain on schedule.

  10. Biochemical removal of HAP precursors from coal. Quarterly technical progress report, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Shake flask tests were completed of microbial pyrite and HAP precursor removal from Rosebud subbituminous coal. Significant amounts of Ni, F, Mn, Cd, Co and Be were removed from this coal. Analyses in connection with leach column tests of Pittsburgh coal were completed and confirmed significant removal of Ni, F, Mn, Cd, Co and As from this coal. Although Hg was not removed from Pittsburgh coal by microbial attack, there was a correlation between HCl leaching of Hg from this coal and the extent of depyritization. Since HgS is soluble in HCl, the results suggest HgS is exposed by chemical and microbial dissolution of coal pyrite. Column tests with cleaned Indiana No. 5 coal are in progress and show significant early dissolution of Ni, Mn, Cd, Co and As. A final shake flask test with Kentucky No. 9 coal was begun. Pittsburgh coal with a low content of fines was shipped to the Idaho National Engineering Laboratory (INEL) in preparation for slurry column tests of HAP precursor removal. Project results were presented at the PETC contractor`s conference held in Pittsburgh. A project progress review meeting was also held with the PETC technical project monitor.

  11. Semiconductor grade, solar silicon purification project. Technical quarterly report No. 10, April 1--June 30, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Ingle, W.M.; Chaney, R.; Thompson, S.; Rosler, D.; Jackson, J.

    1978-07-25

    The technical progress reported is divided into seven task areas. They are as follows: (1) thermal disproportionation of Si/sub x/F/sub y/ homologues on Si packed beds. Effort has been directed toward the study of the thermal disproportionation of Si/sub x/F/sub y/ homologues on Si packed beds at 850/sup 0/C and 500/sup 0/C. (2) review of experimental results on the near-continuous reactor. The silicon transport data from forty runs conducted on the near-continuous reactor are summarized and discussed. (3) thermal analysis of (SiF/sub 2/)/sub x/ polymer. At 276 to 286/sup 0/C a strong exothermic transition occurs in the (SiF/sub 2/)/sub x/ polymer. The enthalpy (..delta..H) measured by D.S.C. was -44.37 cal/gm. Other smaller endotherms were observed at 96/sup 0/C and 363/sup 0/C. (4) motorola purification therodynamics. In the Appendix can be found thermodynamic calculations for the predicted SiF/sub 4/ to SiF/sub 2/ conversion efficiencies for Step I in the SiF/sub 4/ transport purification process. (5) polymer condensation. It was concluded from the polymer condensation experiments at 0/sup 0/C that substrates and higher pressures in the polymer condensation unit increase condensation efficiency. However, the higher pressure occurring in these experiments markedly reduced the Step I reaction efficiency. (6) crystal growth. Single crystal silicon grown from silicon powder from the near-continuous reactor was shown to be 0.95 ohm cm ''p'' type at the seed end and 2 to 7 ohm cm ''N'' type at the tang. (7) process plant costing. Revised process plant costing estimates for a 1000 metric ton/year plant projects a $7.71/kg total product cost. This is based on a fixed capital investment of $9.1 MM in January 1975 dollars.

  12. An experimental study of NO{sub x} recycle in the NOXSO flue gas cleanup process. Quarterly technical progress report, January 1--March 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-08-01

    NO{sub x} recycle is one part of the NOXSO process. In this process, 90% of the acid pollutants (NO{sub x} and SO{sub 2}) can be removed simultaneously by adsorption on the surface of a PO sorbent material. The sorbent is subsequently regenerated by heating and contacting the hot sorbent with a reducing gas followed by steam. The NO{sub x} is removed in the heating process, and the SO{sub 2} is removed by the chemical reaction of the reducing gas and steam. The NO {sub x} stream produced is returned to the combustion process with combustion air, which is called the NO{sub x} recycle. The NO{sub x} is reduced in the flame to N{sub 2}, H{sub 2}0, and CO{sub 2}. NO{sub x} recycle will be implemented at the full-scale commercial demonstration plant at Niles. The concept of NO{sub x} recycle has been tested previously at DOE-Pittsburgh Energy Technology Center (PETC) using a 500 lb/hr coal combustor used for the 3/4 MW tests and also using a tunnel furnace capable of being fired with a variety of fuels including gas, fuel oil, coal, and coal-water mixtures. The results were very promising and demonstrated the destruction of NO{sub x} compounds when fed to the combustion system. The data also indicate that the extent of NO{sub x} reduction is determined by the location of the NO{sub x} injection and the combustor design. This current project is pilot-scale testing of NO{sub x} destruction mechanisms and to help with the implementation at the Niles station.

  13. [National Institute for Petroleum and Energy Research] quarterly technical report, October 1--December 31, 1992. Volume 2, Energy production research

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    Accomplishments for the past quarter are described for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and microbial technology.

  14. Production and screening of carbon products precursors from coal. Quarterly technical progress report No. 5, January 1,1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    Individual quarterly reports of four industrial participants of this project are included in this report. The technical emphasis continues to be the supply of coal-based feedstocks to the industrial participants. There have been several iterations of samples and feedback to meet feedstock characteristics for a wide variety of carbon products. Technology transfer and marketing of the Carbon Products Consortium (CPC) is a continual effort. Interest in the program and positive results from the research continue to grow. In several aspects, the program is ahead of schedule.

  15. Environmental assessment of Oklahoma abandoned drilling and production sites and associated public education outreach activities. Quarterly technical progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    Terry, M.

    1996-01-29

    Oklahoma oil producers and royalty owners are taking part in the nation`s first oil industry funded environmental cleanup and education program. The program is administered by the Oklahoma Energy Resources Board (OERB), a state agency which was created by the Oklahoma Independent Energy Education and Marketing Act. The purpose of this project will be accomplished through two primary objectives: (1) Conduct environmental assessment of abandoned oil and gas drilling and production sites where no responsible owner can be found and transfer environmental technology to oil and gas operators; and (2) Provide a comprehensive public education/outreach program to increase public awareness of the importance of the Oklahoma oil (and gas) industry. Technical progress is reported for these tasks.

  16. Superior catalysts for selective catalytic reduction of nitric oxide. Quarterly technical progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Li, W.B.; Yang, R.T.

    1995-12-31

    During the last quarter, we studied selective catalytic reduction (SCR) of NO with ethylene over Cu{sup 2+}-exchanged pillared clay and the important effect of O{sub 2} concentration. Also, the mechanism of the reaction was discussed. Details are presented in this report.

  17. Support of enhanced oil recovery to independent producers in Texas. Quarterly technical progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Fotouh, K.H.

    1995-09-30

    The main objective of this project is to support independent oil producers in Texas and to improve the productivity of marginal wells utilizing enhanced oil recovery techniques. The main task carried out this quarter was the generation of an electronic data base.

  18. Technical Issues Map for the NHI System Interface and Support Systems Area: 3rd Quarter FY 07

    International Nuclear Information System (INIS)

    This document provides a mapping of technical issues associated with development of the Next Generation Nuclear Plant (NGNP) intermediate heat transport loop and nuclear hydrogen plant support systems to the work that has been accomplished or is currently underway. The technical issues are ranked according to priority and by assumed resolution dates. Due to funding limitations, not all high-priority technical issues are under study at the present time, and more resources will need to be dedicated to tackling such issues in the future. This technical issues map is useful for understanding the relative importance of various technical challenges and will be used as a planning tool by the NHI technical leadership for future work package planning. The technical map in its present form will be discontinued in FY08 and will be folded into a larger NHI System Interface and Support Systems project management plan and scope baseline statement in FY08

  19. Enabling cleanup technology transfer

    International Nuclear Information System (INIS)

    Technology transfer in the environmental restoration, or cleanup, area has been challenging. While there is little doubt that innovative technologies are needed to reduce the times, risks, and costs associated with the cleanup of federal sites, particularly those of the Departments of Energy (DOE) and Defense, the use of such technologies in actual cleanups has been relatively limited. There are, of course, many reasons why technologies do not reach the implementation phase or do not get transferred from developing entities to the user community. For example, many past cleanup contracts provided few incentives for performance that would compel a contractor to seek improvement via technology applications. While performance-based contracts are becoming more common, they alone will not drive increased technology applications. This paper focuses on some applications of cleanup methodologies and technologies that have been successful and are illustrative of a more general principle. The principle is at once obvious and not widely practiced. It is that, with few exceptions, innovative cleanup technologies are rarely implemented successfully alone but rather are implemented in the context of enabling processes and methodologies. And, since cleanup is conducted in a regulatory environment, the stage is better set for technology transfer when the context includes substantive interactions with the relevant stakeholders. Examples of this principle are drawn from Argonne National Laboratory's experiences in Adaptive Sampling and Analysis Programs (ASAPs), Precise Excavation, and the DOE Technology Connection (TechCon) Program. The lessons learned may be applicable to the continuing challenges posed by the cleanup and long-term stewardship of radioactive contaminants and unexploded ordnance (UXO) at federal sites

  20. Bench-scale testing of on-line control of column flotation using a novel analyzer. Second quarterly technical progress report, January 1, 1993--March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-16

    This document contains the second quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTE{trademark} Column Flotation Technology and PTI`s On-Line Quality Monitor and Control System. The twelve-month project involves installation and testing of a 200--300 lb/hr. bench-scale testing circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) for two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). The project schedule timeline by task series for the twelve month project, as it was laid out in the initial Project Work Plan. At the present time, all tasks are progressing according to schedule with the exception of the Task 800 Circuit Testing and Sample Prep and Task 1000 Circuit Decommissioning, which have slipped approximately five weeks due to delays incurred within in the project.

  1. Central Receiver Solar Thermal Power System, Phase 1. CDRL Item 10. Third quarterly technical progress report, 1 April 1976--30 June 1976. [10 MW

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1976-07-01

    Results of analysis and design efforts by McDonnell Douglas Astronautics Company (MDAC), Rocketdyne, Stearns-Roger, Inc., Sheldahl, Inc., and the University of Houston between 1 April 1976 and 30 June 1976 on ERDA Contract No. EY-76-C-03-1108 are summarized. This is the third quarterly technical progress report published on the Phase 1 Central Receiver Solar Thermal Power System contract. The dominant activities during the reporting period have involved the preparation of test facilities for the subsystem research experiments and the fabrication of the test hardware. Summaries of these activities are presented. Alternative design approaches for the 10-MWe pilot plant system and the current pilot plant project schedule are also presented and described.

  2. Low-rank coal research under the UND/DOE cooperative agreement. Quarterly technical progress report, April 1983-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, Jr., G. A.

    1983-01-01

    Progress reports are presented for the following tasks: (1) gasification wastewater treatment and reuse; (2) fine coal cleaning; (3) coal-water slurry preparation; (4) low-rank coal liquefaction; (5) combined flue gas cleanup/simultaneous SO/sub x/-NO/sub x/ control; (6) particulate control and hydrocarbons and trace element emissions from low-rank coals; (7) waste characterization; (8) combustion research and ash fowling; (9) fluidized-bed combustion of low-rank coals; (10) ash and slag characterization; (11) organic structure of coal; (12) distribution of inorganics in low-rank coals; (13) physical properties and moisture of low-rank coals; (14) supercritical solvent extraction; and (15) pyrolysis and devolatilization.

  3. Cleanup of contaminated areas

    International Nuclear Information System (INIS)

    The paper deals with the problem of contaminated areas cleanup, in order to eliminate every possible damage for man safety and environment and to site recovery for some utilization, The first step of cleanup operation is site characterization, that is followed by a pianificazion activity for a better definition of staff qualification, technology to be used, protection and prevention instruments for the risks due to contaminants handling. The second section describes the different remedial technologies for contaminated sites. Remedial technologies may be divided into on-site/off-site and in-situ treatments, according to whether materials (waste, soil, water) are moved to another location or not, respectively. Finally, it is outlined that contaminated areas cleanup is a typical multidisciplinary activity because very different competences are required. (author)

  4. Regulatory and technical reports (Abstract Index Journal). Compilation for third quarter 1985, July-September. Volume 10, No. 3

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal Regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation covers the period from July through September, 1985

  5. VHF EPR analysis of organic sulfur in coal. [Quarterly] technical report, March 1, 1993--May 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Clarkson, R.B.; Belford, R.L. [Illinois Univ., Urbana, IL (United States)

    1993-09-01

    One important goal of this project is the development of methods to analyze the Very High Frequency Electron Paramagnetic Resonance (VHF EPR) spectra from Illinois coals in order to determine the concentration of organic sulfur in them. In this third Quarter, the axially symmetric model for the simulation of VHF EPR coal spectra was refined for routine quantitative percent sulfur determination. The computer modeling technique which we have developed makes use of a sophisticated multi-dimensional simplex strategy for optimization. The percent sulfur determined from VHF-EPR of sporinite, vitrinite, and two blends of these macerals (from Illinois Herrin No. 6) show excellent linear correlation with far less reliable, time consuming, and difficult techniques.

  6. Synthesis of acrylates and methacrlyates from coal-derived syngas. Quarterly technical progress report, January 1, 1995--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Tischer, R.E.; Spivey, J.J.

    1995-08-01

    The objective Task 1, Synthesis of Propionates, is to develop the technology for the synthesis of low-cost propionates. These propionates are the basic feedstock for the subsequent reaction with formaldehyde to produce the target molecule, methyl methacrylate (MMA). Eastman has explored several possible routes to the propionates and has concluded that the most promising is the synthesis of propionic anhydride from the reaction of propionic acid from and ethylene (and also hydrogen in some cases). The main advantage of the anhydride over the acid is that its subsequent reaction with formaldehyde does not produce water, which can lead to undesired byproducts. Bechtel is carrying out a cost analysis of the Eastman route to the anhydride to determine if it is potentially competitive with commercially practiced routes to the same molecule. The answer is expected next quarter. The objective Task 2, Condensation Catalysis to develop catalysts for the condensation of the propionate (propionic anhydride is our target molecule) with formaldehyde. This reaction produces methacrylic acid (MAA), which would then be reacted with methanol to produce MMA in the slurry reactor. We have synthesized a wide range of catalysts and the results show that there is substantial byproduct formation, including 3-pentanone and some propionic acid. Our results show the highest yields of MAA using an alkalized alumina (1%Na/{sub y}-AI{sub 2}O{sub 3}). Although the condensation of propionic acid with formaldehyde is well studied in the literature, little is reported on the condensation of the anhydride. Although it is likely that the same general types of acid/base catalysts that promote the acid condensation will also promote that of the anhydride, the strength and balance of the acid and base sites is likely to be different. We plan to explore the relationship of the catalyst properties and MMA yields using the Altamira system, due to be delivered this next quarter.

  7. [Sonic Enhanced Ash Agglomeration and Sulfur Capture]. [Quarterly technical progress report, September 27, 1993--January 2, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    A major concern with the utilization of coal in directly fired gas turbines is the control of particulate emissions and reduction of sulfur dioxide, and alkali vapor from combustion of coal, upstream of the gas turbine. The Sonic Enhanced Ash Agglomeration and Sulfur Capture program focuses upon the application of an MTCI proprietary invention (Patent No. 5,197,399) for simultaneously enhancing sulfur capture and particulate agglomeration of the combustor effluent. This application can be adapted as either a ``hot flue gas cleanup`` subsystem for the current concepts for combustor islands or as an alternative primary pulse combustor island in which slagging, sulfur capture, particulate agglomeration and control, and alkali gettering as well as NO{sub x} control processes become an integral part of the pulse combustion process. The goal of the program is to support the DOE mission in developing coal-fired combustion gas turbines. In particular, the MTCI proprietary process for bimodal ash agglomeration and simultaneous sulfur capture will be evaluated and developed. The technology embodiment of the invention provides for the use of standard grind, moderately beneficiated coal and WEM for firing the gas turbine with efficient sulfur capture and particulate emission control upstream of the turbine. The process also accommodates injection of alkali gettering material if necessary. This is aimed at utilization of relatively inexpensive coal fuels, thus realizing the primary benefit being sought by direct firing of coal in such gas turbine systems.

  8. Environmental compliance and cleanup

    International Nuclear Information System (INIS)

    This section of the 1994 Hanford Site Environmental Report summarizes the roles of the principal agencies, organizations, and public in environmental compliance and cleanup of the Hanford Site. Regulatory oversight, the Federal Facility Agreement and Consent Order, the role of Indian tribes, public participation, and CERCLA Natural Resource Damage Assessment Trustee Activities are all discussed

  9. Environmental compliance and cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the roles of the principal agencies, organizations, and public in environmental compliance and cleanup of the Hanford Site. Regulatory oversight, the Federal Facility Agreement and Consent Order, the role of Indian tribes, public participation, and CERCLA Natural Resource Damage Assessment Trustee Activities are all discussed.

  10. Tritium research laboratory cleanup and transition project final report

    International Nuclear Information System (INIS)

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project's multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition

  11. Tritium research laboratory cleanup and transition project final report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  12. Environmental Hazards Assessment Program. Quarterly report, July 1994--September 1994

    International Nuclear Information System (INIS)

    The objectives of the Environmental Hazards Assessment Program (EHAP) stated in the proposal to DOE are as follows: Development of a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; development of a pool of talented scientist and experts in cleanup activities, especially in human health aspects; identification of needs and development of programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This is a progress report of the first quarter of the third year of the grant. It reports progress against these grant objectives and the Program Implementation Plan (published at the end of the first year of the grant)

  13. Environmental Hazards Assessment Program. Quarterly report, April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-31

    The objectives of this report are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards, both chemical and radiation, on the health and well-being of all; (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes the progress made this quarter in the following areas: public and professional outreach; science programs; clinical programs; and information support and access systems.

  14. Environmental Hazards Assessment Program. Quarterly report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-31

    This report describes activities and reports on progress for the first quarter (July--September) of the fourth year of the grant to support the Environmental Hazards Assessment Program (EHAP) at the Medical University of South Carolina. It reports progress against the grant objectives and the Program Implementation Plan published at the end of the first year of the grant. The objectives of EHAP stated in the proposal to DOE are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health-oriented aspects of environmental restoration and waste management.

  15. Regulatory and technical reports (Abstract Index Journal). Compilation for first quarter 1986, January-March. Volume 11, No. 1

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission staff and its contractors, as well as conference proceedings. Entries are indexed by contractor report number, personal author, subject, NRC originating organization, NRC contract sponsor, contractor, and licensed facility

  16. US nuclear cleanup shows signs of progress

    International Nuclear Information System (INIS)

    The U.S. Department of Energy's program for dealing with the radioactive and hazardous wastes at its former nuclear weapons production sites and at the national laboratories has been criticized for its expense and slow pace of cleanup. The largest environmental restoration and waste management program in the world faces formidable technical and scientific problems and these, according to numerous investigative committees and commissions, have been compounded by poor management, misuse of technology, and failure to appreciate the need for new basic scientific knowledge to solve many of the cleanup problems. In the past three years, DOE's Office of Environmental Management (EM), often spurred by congressional action, has begun to trim costs and accomplish more. New measures have been introduced to improve contract efficiency, better utilize existing remediation technologies, renegotiate compliance agreements, and begin basic research. Environmental Management Assistant Undersecretary Alvin Alm, appointed in May 1996, is seeking to solidify these changes into an ambitious plan to clean up most of DOE's 130 sites by 2006. But there are widespread doubts that EM has the money, skill, and will to turn itself around. There are also concerns that, in the name of efficiency and economy, EM may be negotiating lower cleanup standards and postponing some difficult cleanup tasks. This article discusses these issues. 7 refs

  17. Bioconversion of coal derived synthesis gas to liquid fuels. Final quarterly technical progress report, July 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jain, M.K.; Worden, R.M.; Grethlein, H.

    1993-10-25

    The overall objective of the project is to develop an integrated two stage fermentation process for conversion of coal-derived synthesis gas to a mixture of alcohols. This is achieved in two steps. In the first step, Butyribacterium methylotrophicum converts carbon monoxide (CO) to butyric and acetic acids. Subsequent fermentation of the acids by Clostridium acetobutylicum leads to the production of butanol and ethanol. The tasks for this quarter were: (1) development/isolation of superior strains for fermentation of syngas, (2) optimization of process conditions for fermentation of syngas, (3) evaluation of bioreactor configuration for improved mass transfer of syngas, (4) development of a membrane-based pervaporation system, (5) optimization of process conditions for reducing carbon and electron loss by H{sub 2}-CO{sub 2} fermentation, and (6) synthesis gas fermentation in single-stage by co-culture. Progress is reported in isolation of CO utilizing anaerobic strains; investigating the product profile for the fermentation of syngas by B. methylotrophicum; and determining the effect of carbon monoxide on growth of C. acetobutylicum.

  18. Coal combustion under conditions of blast furnace injection. [Quarterly] technical report, 1 December 1993--28 February 1994

    Energy Technology Data Exchange (ETDEWEB)

    Crelling, J.C. [Southern Illinois Univ., Carbondale, IL (United States). Dept. of Geology

    1994-06-01

    A potentially new use for Illinois coal is its use as a fuel injected into a blast furnace to produce molten iron as the first step in steel production. Because of its increasing cost and decreasing availability, metallurgical coke is now being replaced by coal injected at the tuyere area of the furnace where the blast air enters. The purpose of this study is to evaluate the combustion of coal during the blast furnace injection process and to delineate the optimum properties of the feed coal. This proposal is a follow-up to one funded for the 1992--1993 period. It is intended to complete the study already underway with the Armco Inc. Steel Company and to initiate a new cooperative study along somewhat similar lines with the Inland Steel Company. The results of this study will lead to the development of a testing and evaluation protocol that will give a unique and much needed understanding of the behavior of coal in the injection process and prove the potential of Illinois coals for such use. During this quarter a sample of the feed coal that is being used for injection into the No. 7 Blast Furnace of Inland Steel has been analyzed petrographically and compared to both the Herrin No. 6 coal and Armco feed coal. Additional characterization is underway and an advanced program of pyrolysis and reactivity testing has been initiated.

  19. Development of molten carbonate fuel cell power plant technology. Quarterly technical progress report No. 2, January 1-March 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Healy, H. C.; Sanderson, R. A.; Wertheim, F. J.; Farris, P. F.; Mientek, A. P.; Maricle, D. L.; Briggs, T. A.; Preston, Jr., J. L.; Louis, G. A.; Abrams, M. L.; Bushnell, C. L.; Nickols, R. C.; Gelting, R. L.; Katz, M.; Stewart, R. C.; Kunz, H. R.; Gruver, G. A.; Bregoli, L. J.; Steuernagel, W. H.; Smith, R.; Smith, S. W.; Szymanski, S. T.

    1980-08-01

    The overall objective of this 29-month program is to develop and verify the design of a prototype molten carbonate fuel cell stack which meets the requirements of 1990's competitive coal-fired electrical utility central station or industrial cogeneration power plants. During this quarter, effort was continued in all four major task areas: Task 1 - system studies to define the reference power plant design; Task 2 - cell and stack design, development and verification; Task 3 - preparation for fabrication and testing of the full-scale prototype stack; and Task 4 - developing the capability for operation of stacks on coal-derived gas. In the system study activity of Task 1, preliminary module and cell stack design requirements were completed. Fuel processor characterization has been completed by Bechtel National, Inc. Work under Task 2 defined design approaches for full-scale stack busbars and electrical isolation of reactant manifolds and reactant piping. Preliminary design requirements were completed for the anode. Conductive nickel oxide for cathode fabrication has been made by oxidation and lithiation of porous nickel sheet stock. A method of mechanizing the tape casting process for increased production rates was successfully demonstrated under Task 3. In Task 4, theoretical calculations indicated that hydrogen cyanide and ammonia, when present as impurities in the stack fuel gas, will have no harmful effects. Laboratory experiments using higher than anticipated levels of ethylene showed no harmful effects. Components for the mobile test facility are being ordered.

  20. A characterization and evaluation of coal liquefaction process streams. Quarterly technical progress report, January 1, through March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The objectives of this project are to support the DOE direct coal liquefaction process development program and to improve the useful application of analytical chemistry to direct coal liquefaction process development. Independent analyses by well-established methods will be obtained of samples produced in direct coal liquefaction processes under evaluation by DOE. Additionally, analytical instruments and techniques which are currently underutilized for the purpose of examining coal-derived samples will be evaluated. The data obtained from this study will be used to help guide current process development and to develop an improved data base on coal and coal liquids properties. A sample bank will be established and maintained for use in this project and will be available for use by other researchers. The reactivity of the non-distillable resids toward hydrocracking at liquefaction conditions (i.e., resid reactivity) will be examined. From the literature and data experimentally obtained, a mathematical kinetic model of resid conversion will be constructed. It is anticipated that such a model will provide insights useful for improving process performance and thus the economics of direct coal liquefaction. Accomplishments for this quarter are described.

  1. Deuterium tracer method for investigating the chemistry of coal liquefaction. Quarterly technical progress report, October--December 1976. [4 refs

    Energy Technology Data Exchange (ETDEWEB)

    Skowronski, R.P.; Ratto, J.J.; Heredy, L.A.

    1977-01-01

    The first pair of hydrogenation experiments with protium and deuterium has been completed and the products from each test have been solvent-fractionated. The good agreement with respect to yields between the two sets of solvent-fractionation data suggests that the products from these two tests should provide excellent material for developing, evaluating, and establishing the deuterium tracer technique. Products from the hydrogenation experiments have been analyzed by elemental analysis. Gel permeation chromatography has been used to investigate molecular weight distributions. Also, the absolute weight fraction of deuterium in these products have been determined. The water formed during the combustion analyses has been condensed and analyzed by mass spectrometry for /sup 1/H/sub 2/O, /sup 1/H/sup 2/HO, and /sup 2/H/sub 2/O content. The soluble products obtained have been analyzed by proton, deuteron, and carbon-13 nuclear magnetic resonance spectroscopy. Evaluation of all the spectra has been completed. The conditions under which this test pair had been conducted led to an extensive distribution of the deuterium label with respect to structural positions in the products. A third hydrogenation experiment with protium was performed during this quarter at a lower temperature and for a shorter reaction time in an attempt to enhance the specificity of the deuterium uptake.

  2. Quarterly Technical Progress Report of Radioisotope Power System Materials Production and Technology Program tasks for April 2000 through June 2000

    Energy Technology Data Exchange (ETDEWEB)

    Moore, J.P.

    2000-10-23

    The Office of Space and Defense Power Systems (OSDPS) of the Department of Energy (DOE) provides Radioisotope Power Systems (RPS) for applications where conventional power systems are not feasible. For example, radioisotope thermoelectric generators were supplied by the DOE to the National Aeronautics and Space Administration for deep space missions including the Cassini Mission launched in October of 1997 to study the planet Saturn. The Oak Ridge National Laboratory (ORNL) has been involved in developing materials and technology and producing components for the DOE for more than three decades. For the Cassini Mission, for example, ORNL was involved in the production of carbon-bonded carbon fiber (CBCF) insulator sets, iridium alloy blanks and foil, and clad vent sets (CVSs) and weld shields (WSs). This quarterly report has been divided into three sections to reflect program guidance from OSDPS for fiscal year (FY) 2000. The first section deals primarily with maintenance of the capability to produce flight quality carbon-bonded carbon fiber (CBCF) insulator sets, iridium alloy blanks and foil, clad vent sets (CVSs), and weld shields (WSs). In all three cases, production maintenance is assured by the manufacture of limited quantities of flight quality (FQ) components. The second section deals with several technology activities to improve the manufacturing processes, characterize materials, or to develop technologies for two new RPS. The last section is dedicated to studies of the potential for the production of 238Pu at ORNL.

  3. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1984, July-September. Volume 9, No. 3

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, and NUREG/CR-XXXX. These precede the following indexes: Contractor Report Number, Personal Author, Subject, NRC Originating Organization (Staff Reports), NRC Contract Sponsor (Contractor Reports), Contractor, and Licensed Facility

  4. Low-rank coal research under the UND/DOE cooperative agreement. Quarterly technical progress report, July-September 1983

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, G.A. Jr.

    1983-01-01

    Two long gasification tests were accomplished (66 and 72 hours of slagging operation) this quarter, and the balance of the wastewater needed for the second cooling tower (CT) test (approx. 11,000 gallons) was generated. Eleven thousand gallons of slagging fixed-bed gasifier (SFBG) wastewater were solvent extracted and ammonia stripped (AS) to nominal levels of 160 mg/1 phenol and 600 mg/1 NH/sub 3/. This wastewater is being further treated by activated sludge (AS) and granular activated carbon (GAC) processing to prepare a high quality makeup for the second CT test. Phenol mass balances indicated that > 90 pct of the phenol was stripped from the tower, indicating that previous assumptions of high levels of biodegradation were erroneous. Over 80 pct of the ammonia and about 25 pct of the methanol were also stripped. Data collected during steady state operation of the bench-scale rotating biological contractor indicate complete removal of phenolics and alcohols, and 94 pct removal of BOD. Nitrification also occurred in this unit, with over 30 pct removal of ammonia. Problems due to individual bacteria, present in the biotreated wastewater, passing through the multi-media filter and thus decreasing the carbon adsorption efficiency of the GAC system, have resulted in lower treatment rates than originally anticipated. As a result, to achieve the desired treatment, the contact time of the wastewater with the carbon in the granular activated carbon system has been increased. Since this has decreased the treatment rate, a larger carbon adsorption system has been designed and is presently being constructed.

  5. A characterization and evaluation of coal liquefaction process streams. Quarterly technical progress report, July 1--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1995-12-01

    The objectives of this project are to support the DOE direct coal liquefaction process development program and to improve the useful application of analytical chemistry to direct coal liquefaction process development. Independent analyses by well-established methods will be obtained of samples produced in direct coal liquefaction processes under evaluation by DOE. Additionally, analytical instruments and techniques which are currently underutilized for the purpose of examining coal-derived samples will be evaluated. The data obtained from this study will be used to help guide current process development and to develop an improved data base on coal and coal liquids properties. A sample bank will be established and maintained for use in this project and will be available for use by other researchers. The reactivity of the non-distillable resids toward hydrocracking at liquefaction conditions (i.e., resid reactivity) will be examined. From the literature and data experimentally obtained, a mathematical kinetic model of resid conversion will be constructed. It is anticipated that such a model will provide insights useful for improving process performance and thus the economics of direct coal liquefaction. Some of the contract activities for this quarter are: We completed many of the analyses on the 81 samples received from HTI bench-scale run CMSL-9, in which coal, coal/mixed plastics, and coal/high density polyethylene were fed; Liquid chromatographic separations of the 15 samples in the University of Delaware sample set were completed; and WRI completed CP/MAS {sup 13}C-NMR analyses on the Delaware sample set.

  6. Carbonaceous shales of Indiana as sources of energy, petrochemicals, and ceramic materials. Quarterly technical progress report, April, May, June, 1978

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    Activities in survey programs are reported. A site for taking a core of New Albany Shale has been selected in Clark County. Work continued on drafting final copies of the interlocking stratigraphic cross sections in the Illinois and Michigan Basins. Minor corrections and additions are being made as drafting continues. Illinois Basin: Work continues on preparation of the preliminary isopach map of the Sweetland Creek Member in the Illinois Basin. Samples from key wells were examined to establish the relationship of the Sweetland Creek Member with the overlying Grassy Creek Member and underlying Blocher Member as accurately as possible. Preparation of an isopach map of the Blocher also continued during the quarter. Correlations have been established for the unit from its type section in Scott County to sections in the Illinois Basin and along the outcrop. Sample studies are being made at intervals along each of the stratigraphic cross section lines. Maps showing structure and gas wells are being compared with other maps of the region on which lineaments are plotted. A summary of the study of these relationships will be included in the preprints of the Second Eastern Gas Shales symposium.Preliminary results of x-ray and petrographic studies of New Albany Shale from the Phegley well, from Survey Drill Hole No. 275, and from core C-2, which was drilled near Indianapolis by the American Aggregates Company are shown in the tables which accompany this report. These tables indicate a preliminary but rather complete, summary of the minerals comprising the New Albany Shale. A summary of efforts devoted to chemical analysis of drill cores is also included. (JRD)

  7. Laser ultrasonic furnace tube coke monitor. Quarterly technical progress report No. 2 for reporting period August 1, 1998--November 1, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-10

    This report summarizes the technical progress achieved during the first quarter of the ERIP project entitled, ``Laser Ultrasonic Furnace Tube Coke Monitor.`` The focus of work during this reporting period was the testing of a novel device for introducing a broad bandwidth ultrasonic pulse at the surface of a simulated furnace tube. The device employs a sacrificial stand-off composed of a fusible alloy that conforms to hot furnace tube surface upon contact. Conventional high-temperature couplants have a maximum operating temperature of about 550{degrees}C, which limits their use for contact against ethylene cracker furnace tube surfaces that typically operate at about 1000{degrees}C. In the absence of a couplant, insufficient ultrasonic energy can be transmitted from the transducer to the tube surface. By using a fusible alloy, the device efficiently couples the transducer to the hot furnace tube surface, even for rough and convex tube surfaces operating at temperatures of 1800{degrees}F and above. Initial tests confirmed the ability to resolve pulse echoes in a simulated furnace tube using a 5 MHz piezoelectric transducer with a fusible stand-off.

  8. Production and screening of carbon products precursors from coal. Quarterly technical progress report and key personnel staffing report No. 6, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    The main goal of this program is to demonstrate the utility of coal extracts from the West Virginia University (WVU) extraction process as suitable base raw materials for the carbon products encompassed by the Carbon Products Consortium (CPC) team. This quarterly report covers activities during the period from April 1, 1996 through June 30, 1996. The first year of the project ended in February, 1996; however, the WVU research effort has continued on a no-cost extension of the original contract. Samples have been supplied to CPC participants so they could conduct their portions of the project as contracted through ORNL. Progress reports are presented for the following tasks: project planning and administration; consortium administration and reporting; coal extraction; technical/economic evaluation of WVU extraction process; and technology transfer. Previous work has shown that the WVU coal extraction process coupled with hydrotreatment, does have the potential for producing suitable base raw materials for carbon products. Current effort, therefore, involved the screening and evaluation of extracts produced by the WVU Group and recommending appropriate materials for scaleup for subsequent evaluation by Consortium Team members. As part of this program, the activation of the coal extraction residues was investigated for the purpose of producing a useful active carbon. A further task, which was started towards the end of the program, was to fabricate a small graphite artifact using Coke derived from coal extract as the filler and the coal extract itself as a binder. The results of these studies are summarized in this report.

  9. Advanced direct liquefaction concepts for PETC generic units, Phase 2. Quarterly technical progress report, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The aims of this research program are to advance to bench-scale testing, concepts that have the potential for making net reductions in direct coal liquefaction process costs. The research involves a teaming arrangement between the University of Kentucky Center for Applied Energy Research (CAER), Consolidation Coal Company (CONSOL), Sandia National Laboratories (SNL), and LDP Associates. Progress reports are presented for: Task 2.1.1 development of a catalyst screening test (UK/CAER); Task 2.1.2 activation of impregnated catalysts (UK/CAER); Task 2.2 laboratory support (CONSOL); Task 3 continuous operations/parametric studies (Hydrocarbon Technologies, Inc.) and; Task 4.4 conceptual design, preliminary technical assessment (LDP Associates).

  10. Cleanup contract protest upheld

    International Nuclear Information System (INIS)

    Cleanup of the huge Hanford nuclear weapon site in Washington state, long mired in disputes over contract awards, faces another potential delay. On October 12 the US General Accounting Office upheld a protest to the award of the site's $800-million Environmental Restoration Management Contract (ERMC). GAO has ordered the US DOE to review the contract award to a team led by Bechtel Group Inc., a process observers say could be quick or a quagmire. GAO sustained part of a protest filed in early 1993 by Parsons Environmental Services Inc., Pasadena, California, which led an unsuccessful team bid for the ERMC

  11. Reactor coolant cleanup facility

    International Nuclear Information System (INIS)

    A depressurization device is disposed in pipelines upstream of recycling pumps of a reactor coolant cleanup facility to reduce a pressure between the pressurization device and the recycling pump at the downstream, thereby enabling high pressure coolant injection from other systems by way of the recycling pumps. Upon emergency, the recycling pumps of the coolant cleanup facility can be used in common to an emergency reactor core cooling facility and a reactor shutdown facility. Since existent pumps of the emergency reactor core cooling facility and the reactor shutdown facility which are usually in a stand-by state can be removed, operation confirmation test and maintenance for equipments in both of facilities can be saved, so that maintenance and reliability of the plant are improved and burdens on operators can also be mitigated. Moreover, low pressure design can be adopted for a non-regenerative heat exchanger and recycling coolant pumps, which enables to improve the reliability and economical property due to reduction of possibility of leakage. (N.H.)

  12. CO{sub 2} Huff-n-Puff process in a light oil shallow shelf carbonate reservoir. Quarterly technical progress report, October--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    Wehner, S.; Prieditis, J.

    1996-12-31

    The principal objective of the Central Vacuum Unit (CVU) CO{sub 2} Huff-n-Puff (H-n-P) project is to determine the feasibility and practicality of the technology in a waterflooded shallow shelf carbonate environment. The results of parametric simulation of the CO{sub 2} H-n-P process, coupled with the CVU reservoir characterization components will be used to determine if this process is technically and economically feasible for field implementation. The technology transfer objective of the project is to disseminate the knowledge gained through an innovative plan in support of the Department of energy`s (DOE) objective of increasing domestic oil production and deferring the abandonment of shallow shelf carbonate reservoirs. Texaco Exploration and Production Inc`s. (TEPI) mid-term plans are to implement a full-scale miscible CO{sub 2} project in the CVU. TEPI concluded all of the tasks associated with the First Budget Period by October, 1995. The DOE approved the TEPI continuation application. Budget Period No. 2 is in progress. Initial injection of CO{sub 2} began in November, and after a short shut-in period for the soak, the well was returned to production in late December, 1995. This report, covers TEPI`s efforts at history matching the results of the field demonstration. Costs and economics of the work are presented. The majority of effort during the fourth quarter has revolved around the selection of a new project site and refinement of the demonstration design and well selection.

  13. Cleanup of demineralizer resins

    International Nuclear Information System (INIS)

    Radiocesium is being removed from demineralizers A and B (DA and DB) by a process that was developed from laboratory tests on small samples of resin from the demineralizers. The process was designed to elute the radiocesium from the demineralizer resins and then to resorb it onto the zeolite ion exchangers contained in the Submerged Demineralizer System (SDS). It was also required to limit the maximum cesium activities in the resin eluates (SDSD feeds) so that the radiation field surrounding the pipelines would not be excessive. The process consisted of 17 stages of batch elution. In the initial stage, the resin was contacted with 0.18 M boric acid. Subsequent stages subjected the resin to increasing concentrations of sodium in NaH2BO3-H3BO3 solution (total boron= 0.35 M) and then 1 M sodium hydroxide in the final stages. Results on the performance of the process in the cleanup of the demineralizers at TMI-2 are compared with those obtained from laboratory tests with small samples of the DA and DB resins. To date, 15 stages of batch elution have been completed on the demineralizers at TMI-2, which resulted in the removal of about 750 Ci of radiocesium from DA and about 3300 Ci from DB

  14. Graphite waste pit cleanup

    International Nuclear Information System (INIS)

    The UP1 plant in Marcoule reprocessed nearly 20,000 tons of used natural uranium gas cooled reactor fuel coming from the first generation of civil nuclear reactors in France. During more than 40 years, the decladding operations produced thousands of tons of processed waste, mainly magnesium and graphite fragments. In the absence of a French repository for the graphite waste, the graphite sludge content of the storage pit had to be retrieved and transferred into a newer and safer pit. So, this project consists in the full retrieval and transfer of 15 m3 of water mixed with graphite dust located in the decladding facility, as well as the complete cleanup and decontamination of the pit. The equipment and process necessary for retrieval operations were designed, built and tested. The process is mainly based on the use of two pumps (one to capture and the other one to transfer the sludge) working one after the other and a robotic arm mounted on a telescopic mast. A dedicated process was also set up for the removal of the biggest fragments. In the pit, the sludge retrieval and transfer operations have been almost completed. Most of the non-pumpable graphite fragments has been removed and transferred to a new storage pit. As irradiant fragments have been discovered in the pit, specific studies are in progress in order to remove them to the laboratory for dissolution. This work is expected to 2014. (authors)

  15. Cleanups in my Community Widget

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Cleanups in my Community widget returns facilities within the area of interest that are in the process of being cleaned up, or have been cleaned up, by programs...

  16. United States Policies for Cleanup at Radioactively Contaminated Sites

    International Nuclear Information System (INIS)

    The United States Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation is responsible for implementing the long term (non-emergency) portion of a key law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed ‘Superfund.’ This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, and to ensure protection of human health and the environment. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a manner consistent with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund’s primary programme for long term cleanup (the National Priorities List), chemical contamination is also present. (author)

  17. (Pittsburgh Energy Technology Center): Quarterly technical progress report for the period ending June 30, 1987. [Advanced Coal Research and Technology Development Programs

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-02-01

    Research programs on coal and coal liquefaction are presented. Topics discussed are: coal science, combustion, kinetics, surface science; advanced technology projects in liquefaction; two stage liquefaction and direct liquefaction; catalysts of liquefaction; Fischer-Tropsch synthesis and thermodynamics; alternative fuels utilization; coal preparation; biodegradation; advanced combustion technology; flue gas cleanup; environmental coordination, and technology transfer. Individual projects are processed separately for the data base. (CBS)

  18. Needs for Risk Informing Environmental Cleanup Decision Making - 13613

    International Nuclear Information System (INIS)

    This paper discusses the needs for risk informing decision making by the U.S. Department of Energy (DOE) Office of Environmental Management (EM). The mission of the DOE EM is to complete the safe cleanup of the environmental legacy brought about from the nation's five decades of nuclear weapons development and production and nuclear energy research. This work represents some of the most technically challenging and complex cleanup efforts in the world and is projected to require the investment of billions of dollars and several decades to complete. Quantitative assessments of health and environmental risks play an important role in work prioritization and cleanup decisions of these challenging environmental cleanup and closure projects. The risk assessments often involve evaluation of performance of integrated engineered barriers and natural systems over a period of hundreds to thousands of years, when subject to complex geo-environmental transformation processes resulting from remediation and disposal actions. The requirement of resource investments for the cleanup efforts and the associated technical challenges have subjected the EM program to continuous scrutiny by oversight entities. Recent DOE reviews recommended application of a risk-informed approach throughout the EM complex for improved targeting of resources. The idea behind this recommendation is that by using risk-informed approaches to prioritize work scope, the available resources can be best utilized to reduce environmental and health risks across the EM complex, while maintaining the momentum of the overall EM cleanup program at a sustainable level. In response to these recommendations, EM is re-examining its work portfolio and key decision making with risk insights for the major sites. This paper summarizes the review findings and recommendations from the DOE internal reviews, discusses the needs for risk informing the EM portfolio and makes an attempt to identify topics for R and D in integrated

  19. Accelerating cleanup: Paths to closure

    International Nuclear Information System (INIS)

    This report describes the status of Environmental Management's (EM's) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE's 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM's accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document

  20. Accelerating cleanup: Paths to closure

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    This report describes the status of Environmental Management`s (EM`s) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE`s 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM`s accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document.

  1. The TMI-2 clean-up project collection and databases

    International Nuclear Information System (INIS)

    A publicly accessible collection containing several thousand of the videotapes, photographs, slides and technical reports generated during the clean-up of the TMI-2 reactor has been established by the Pennsylvania State University Libraries. The collection is intended to serve as a technical resource for the nuclear industry as well as the interested public. Two Internet-searchable databases describing the videotapes and technical reports have been created. The development and use of these materials and databases are described in this paper. (orig.)

  2. Oil spills and their cleanup

    International Nuclear Information System (INIS)

    Oil spills are an unfortunately common occurrence in the world's seas and can have extensive damaging environmental consequences. This article examines various methods of cleaning up oil spills, evaluates their effectiveness in various situations, and identifies areas where, current methods being inadequate, further research is needed. Containment, mechanical removal, shoreline cleanup, chemical treating agents, in situ burning, natural recovery and enhanced bioremediation are all assessed. The cleanup method must be selected to match environmental conditions. Results are good in quiet, sheltered waters, but need extensive development in open waters and high seas. (UK)

  3. Commercial demonstration of the NOXSO SO{sub 2}/NO{sub x} removal flue gas cleanup system. Quarterly technical progress report No. 13, March 1, 1994--May 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The NOXSO process is a dry, post-combustion flue gas treatment technology which uses a regenerable sorbent to simultaneously adsorb sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) from the flue gas of a coal-fired utility boiler. In the process, the SO{sub 2} is converted to a sulfur by-product and the NO{sub x} is converted to nitrogen and oxygen. It is predicted that the process can economically remove 90% of the acid rain precursor gases from the flue gas stream in a retrofit or new facility. The objective of the NOXSO Demonstration Project is to design, construct, and operate a flue gas treatment system utilizing the NOXSO process. The effectiveness of the process will be demonstrated by achieving significant reductions in emissions of sulfur and nitrogen oxides. In addition, sufficient operating data will be obtained to confirm the process economics and provide a basis to guarantee performance on a commercial scale. The project is presently in the project definition and preliminary design phase. Data obtained during pilot plant testing which was completed on July 30, 1993 is being incorporated in the design of the commercial size plant. A suitable host site to demonstrate the NOXSO process on a commercial scale is presently being sought. Preliminary engineering activities involved evaluating various design options for the major process vessels with the principal focus being on the sorbent heater vessel, which is operated at the highest temperature. Additionally, the impact of the NOXSO system on power plant particulate emissions and opacity was estimated. It is predicted that particulate emissions will decrease slightly while opacity will increase slightly. Neither change will be significant enough to have an impact on emissions compliance. Advertised performance of the proposed adsorber separator is being verified by laboratory testing. Process studies activities included POC equipment inspection and materials evaluations.

  4. Nuclear arms cleanup

    International Nuclear Information System (INIS)

    The Soviet Union's demise five years ago brought an end to the Cold War, the 45-year arms race between the Soviet superpower and the United States. The euphoria that greeted the end of this bloodless conflict has dampened somewhat, however, as U.S. officials and their counterparts in the former Soviet republics come to grips with its legacy: thousands of highly toxic and politically destabilizing nuclear weapons. With no more perceived need for much of their vast arsenals, the governments have agreed to dismantle large numbers of nuclear warheads. But the agencies involved in this task face a daunting technical and political problem: what to do with the thousands of tons of plutonium and uranium that are the main ingredients of nuclear weapons

  5. Innovative Clean Coal Technology (ICCT): 500 MW demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. Technical progress report: First quarter 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly report discusses the technical progress of an Innovative Clean Coal Technology (ICCT) demonstration being conducted at Georgia Power Company`s Plant Hammond Unit 4 located near Rome, Georgia. The primary goal of this project is the characterization of the low NO{sub x} combustion equipment through the collection and analysis of long-term emissions data. A target of achieving fifty percent NO{sub x} reduction using combustion modifications has been established for the project. The project provides a stepwise retrofit of an advanced overfire air (AOFA) system followed by low NO{sub x} burners (LNB). During each test phase of the project, diagnostic, performance, long-term, and verification testing will be performed. These tests are used to quantify the NO{sub x} reductions of each technology and evaluate the effects of those reductions on other combustion parameters such as particulate characteristics and boiler efficiency. During this quarter, long-term testing of the LNB + AOFA configuration continued and no parametric testing was performed. Further full-load optimization of the LNB + AOFA system began on March 30, 1993. Following completion of this optimization, comprehensive testing in this configuration will be performed including diagnostic, performance, verification, long-term, and chemical emissions testing. These tests are scheduled to start in May 1993 and continue through August 1993. Preliminary engineering and procurement are progressing on the Advanced Low NOx Digital Controls scope addition to the wall-fired project. The primary activities during this quarter include (1) refinement of the input/output lists, (2) procurement of the distributed digital control system, (3) configuration training, and (4) revision of schedule to accommodate project approval cycle and change in unit outage dates.

  6. Historical research in the Hanford site waste cleanup

    International Nuclear Information System (INIS)

    This paper will acquaint the audience with role of historical research in the Hanford Site waste cleanup - the largest waste cleanup endeavor ever undertaken in human history. There were no comparable predecessors to this massive waste remediation effort, but the Hanford historical record can provide a partial road map and guide. It can be, and is, a useful tool in meeting the goal of a successful, cost-effective, safe and technologically exemplary waste cleanup. The Hanford historical record is rich and complex. Yet, it poses difficult challenges, in that no central and complete repository or data base exists, records contain obscure code words and code numbers, and the measurement systems and terminology used in the records change many times over the years. Still, these records are useful to the current waste cleanup in technical ways, and in ways that extend beyond a strictly scientific aspect. Study and presentations of Hanford Site history contribute to the huge educational and outreach tasks of helping the Site's work force deal with 'culture change' and become motivated for the cleanup work that is ahead, and of helping the public and the regulators to place the events at Hanford in the context of WWII and the Cold War. This paper traces historical waste practices and policies as they changed over the years at the Hanford Site, and acquaints the audience with the generation of the major waste streams of concern in Hanford Site cleanup today. It presents original, primary-source research into the waste history of the Hanford Site. The earliest, 1940s knowledge base, assumptions and calculations about radioactive and chemical discharges, as discussed in the memos, correspondence and reports of the original Hanford Site (then Hanford Engineer Works) builders and operators, are reviewed. The growth of knowledge, research efforts, and subsequent changes in Site waste disposal policies and practices are traced. Examples of the strengths and limitations of the

  7. Recycling Facilities - Land Recycling Cleanup Locations

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — Land Recycling Cleanup Location Land Recycling Cleanup Locations (LRCL) are divided into one or more sub-facilities categorized as media: Air, Contained Release or...

  8. Development of a risk-based approach to Hanford Site cleanup

    International Nuclear Information System (INIS)

    In response to a request from Mr. Thomas Grumbly, Assistant Secretary of Energy for Environmental Management, the Hanford Site contractors developed a conceptual set of risk-based cleanup strategies that (1) protect the public, workers, and environment from unacceptable risks; (2) are executable technically; and (3) fit within an expected annual funding profile of 1.05 billion dollars. These strategies were developed because (1) the US Department of Energy and Hanford Site budgets are being reduced, (2) stakeholders are dissatisfied with the perceived rate of cleanup, (3) the US Congress and the US Department of Energy are increasingly focusing on risk and riskreduction activities, (4) the present strategy is not integrated across the Site and is inconsistent in its treatment of similar hazards, (5) the present cleanup strategy is not cost-effective from a risk-reduction or future land use perspective, and (6) the milestones and activities in the Tri-Party Agreement cannot be achieved with an anticipated funding of 1.05 billion dollars annually. The risk-based strategies described herein were developed through a systems analysis approach that (1) analyzed the cleanup mission; (2) identified cleanup objectives, including risk reduction, land use, and mortgage reduction; (3) analyzed the existing baseline cleanup strategy from a cost and risk perspective; (4) developed alternatives for accomplishing the cleanup mission; (5) compared those alternatives against cleanup objectives; and (6) produced conclusions and recommendations regarding the current strategy and potential risk-based strategies

  9. Development of a risk-based approach to Hanford Site cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Hesser, W.A.; Daling, P.M. [Pacific Northwest Lab., Richland, WA (United States); Baynes, P.A. [Westinghouse Hanford Co., Richland, WA (United States)] [and others

    1995-06-01

    In response to a request from Mr. Thomas Grumbly, Assistant Secretary of Energy for Environmental Management, the Hanford Site contractors developed a conceptual set of risk-based cleanup strategies that (1) protect the public, workers, and environment from unacceptable risks; (2) are executable technically; and (3) fit within an expected annual funding profile of 1.05 billion dollars. These strategies were developed because (1) the US Department of Energy and Hanford Site budgets are being reduced, (2) stakeholders are dissatisfied with the perceived rate of cleanup, (3) the US Congress and the US Department of Energy are increasingly focusing on risk and riskreduction activities, (4) the present strategy is not integrated across the Site and is inconsistent in its treatment of similar hazards, (5) the present cleanup strategy is not cost-effective from a risk-reduction or future land use perspective, and (6) the milestones and activities in the Tri-Party Agreement cannot be achieved with an anticipated funding of 1.05 billion dollars annually. The risk-based strategies described herein were developed through a systems analysis approach that (1) analyzed the cleanup mission; (2) identified cleanup objectives, including risk reduction, land use, and mortgage reduction; (3) analyzed the existing baseline cleanup strategy from a cost and risk perspective; (4) developed alternatives for accomplishing the cleanup mission; (5) compared those alternatives against cleanup objectives; and (6) produced conclusions and recommendations regarding the current strategy and potential risk-based strategies.

  10. Methodology for setting cleanup criteria

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) has developed guidance for establishing cleanup criteria or authorized limits for sites containing residual radioactive material. The DOE requires that the as-low-as-reasonably-achievable (ALARA) process be applied. This process results in the development of cleanup levels that are as low as practicable giving due consideration to health, environment, economics, cultural, and natural resources and other factors. The process employs a cost-benefit optimization analysis and, where appropriate and feasible, considers multiple attributes. Frequently, some important factors or attributes do not lend themselves to quantification in a cost-benefit study and therefore must be considered qualitatively in the process. While the cost-benefit analysis is not the only consideration, it is an important clement in the establishment of cleanup criteria and selection of remedial alternatives. Key to the cost-benefit process is the relation between cleanup level and dose. This is determined through pathway analysis methodology. This paper discusses the pathway analysis process and will cover radiologically and nonradiologically contaminated sites and building contamination

  11. 500 MW demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. Technical progress report, second quarter 1994, April 1994--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This quarterly report discusses the technical progress of an Innovative Clean Coal Technology (ICCT) demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NOx) emissions from coal-fired boilers. The project is being conducted at Georgia Power Company`s Plant Hammond Unit 4 located near Rome, Georgia. The primary goal of this project is the characterization of the low NOx combustion equipment through the collection and analysis of long-term emissions data. A target of achieving fifty percent NOx reduction using combustion modifications has been established for the project. The project provides a stepwise retrofit of an advanced overfire air (AOFA) system followed by low NOx burners (LNB). During each test phase of the project, diagnostic, performance, long-term, and verification testing will be performed. These tests are used to quantify the NOx reductions of each technology and evaluate the effects of those reductions on other combustion parameters. Results are described.

  12. Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly technical progress report 11, April--June, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Moro, N.; Shields, G.L.; Smit, F.J.; Jha, M.C.

    1995-07-31

    The primary goal of this project is the engineering development of two advanced physical fine coal cleaning processes, column flotation and selective agglomeration, for premium fuel applications. The project scope includes laboratory research and bench-scale testing on six coals to optimize these processes, followed by design, and construction of a 2-t/hr process development unit (PDU). The PDU will then be operated to generate 200 tons of each of three project coals, by each process. During Quarter 11 (April--June, 1995), work continued on the Subtask 3.2 in-plant testing of the Microcel{trademark} flotation column at the Lady Dunn Preparation Plant with the installation and calibration of a refurbished 30-inch diameter column. The evaluation of toxic trace element data for column flotation samples continued, with preliminary analysis indicating that reasonably good mass balances were achieved for most elements, and that significant reductions in the concentration of many elements were observed from raw coal, to flotation feed, to flotation product samples. Significant progress was made on Subtask 6.5 selective agglomeration bench-scale testing. Data from this work indicates that project ash specifications can be met for all coals evaluated, and that the bulk of the bridging liquid (heptane) can be removed from the product for recycle to the process. The detailed design of the 2 t/hr selective agglomeration module progressed this quarter with the completion of several revisions of both the process flow, and the process piping and instrument diagrams. Procurement of coal for PDU operation began with the purchase of 800 tons of Taggart coal. Construction of the 2 t/hr PDU continued through this reporting quarter and is currently approximately 60% complete.

  13. Identification and validation of heavy metal and radionuclide accumulating terrestrial plant species. Quarterly technical progress report, June 21, 1995--September 20, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Kochian, L.

    1995-12-31

    This quarterly report describes experiments on uptake of a variety of heavy metals by plants. Titles of report sections are (1) Alleviation of heavy-metal induced micronutrient deficiency through foliar fertilization, (2) Second screen for Zn, Cu, and Cd accumulation, (3) Characterization of the root Zn hyperaccumulation by Thlaspi caerulescens, (4) Comparison of commercial Brassica accessions obtained from the Iowa seed bank, (5) Second screening experiment for the accumulation of Cs and Sr by plants, (6) Effect of Ca on Cs and Sr accumulation by selected dicot species, and (7) Preliminary investigations into the forms of uranium taken up by plants.

  14. Decontamination systems information and research programs. Quarterly report, July 1--August 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The US contains numerous hazardous waste sites. Many sites are on private land near operating units of various companies. An effort is being made to determine the conditions under which such sites can be remediated voluntarily. The objective of the project will be to first assess the interest and willingness of industry in the Kanawha River Valley, WV to participate in discussions that would lead toward voluntary cleanup activities. The second will be to implement the activities agreed upon by the interested parties. The project will first involve individual discussions with the industrial, government, and other organized groups in the area. These discussions will help determine the feasibility of organizing voluntary efforts. If the discussions indicate that conditions may be favorable for developing individual or group voluntary cleanup projects, a working group will be convened to establish the environmental goals of the project as well as the technical approach for achieving those goals. The projects for the 1996 WVU Cooperative Agreement are categorized into three task focus areas: Task 1.0 Contaminant Plume Containment and Remediation, Task 2.0 Cross Cutting Innovative Technologies, and Task 3.0 Small Business Support Program. Summaries of the accomplishments for the subtasks reporting under these categories during the third quarter, 1 July 96 through 30 September 96, are presented.

  15. Short-term energy outlook. Quarterly projections, first quarter 1995

    International Nuclear Information System (INIS)

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). The forecast period for this issue of the Outlook extends from the first quarter of 1995 through the fourth quarter of 1996. Values for the fourth quarter of 1994, however, are preliminary EIA estimates or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service

  16. Radioactive Waste and Clean-up: Introduction

    International Nuclear Information System (INIS)

    The primary mission of the Radioactive Waste and Clean-up division is to propose, to develop and to evaluate solutions for a safe, acceptable and sustainable management of radioactive waste. The Radioactive Waste and Clean-up division programme consists in research, studies, development and demonstration aiming to realise the objective of Agenda 21 on sustainable development in the field of radioactive waste and rehabilitation on radioactively contaminated sites. Indeed, it participates in the realisation of an objective which is to ensure that radioactive wastes are safely managed, transported, stored and disposed of, with a view to protecting human health and the environment, within a wider framework of an interactive and integrated approach to radioactive waste management and safety. We believe that nuclear energy will be necessary for the sustainable development of mankind in the 21st century, but we well understand that it would not be maintained if it is not proven that within benefits of nuclear energy a better protection of the environment is included. Although the current waste management practices are both technically and from the environmental point of view adequate, efforts in relation of future power production and waste management technologies should be put on waste minimisation. Therefore, the new and innovative reactors, fuel cycle and waste management processes and installations should be designed so that the waste generation can be kept in minimum. In addition to the design, the installations should be operated so as to create less waste; consideration should be given e.g. to keeping water chemistry clean and other quality factors. SCK-CEN in general and the Radioactive Waste and Clean-up division in particular are present in international groups preparing the development of innovative nuclear reactors, as Generation 4 and INPRO. Because performance assessments are often black boxes for the public, demonstration is needed for the acceptation of

  17. Environmental Hazards Assessment Program quarterly report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-30

    The objectives of the Environmental Hazards Assessment Program (EHAP) stated in the proposal to DOE are to: develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter (January--March) of the third year of the grant. It reports progress against these grant objectives and the Program Implementation Plan published at the end of the first year of the grant. Questions, comments, or requests for further information concerning the activities under this grant can be forwarded to Jack Davis in the EHAP office of the Medical University of South Carolina at (803) 727-6450.

  18. Helping with the clean-up

    International Nuclear Information System (INIS)

    Successes in public involvement efforts for nuclear waste management are so few that they deserve careful documentation and analysis. This paper chronicles the goals, process, problems and outcomes of one such success, the Northwest Defense Waste Citizens Forum (CF), created by the DOE-Richland manager in 1986 to advise DOE on its plans for nuclear waste disposal and cleanup of the Hanford site n eastern Washington state. In the evolving, often-controversial, highly-visible area of agency-public interactions, citizen task forces (TFs) have been shown to be useful in developing public policy at the local level. Making them work at the state level is more problematic. This case shows that a diverse, two-state citizen group can make significant contributions to complex EIS evaluations with heavy technical components. The CFs principal contribution to public policy was communication of its findings to business and professional groups, to area political representatives and state agencies, thereby laying the ground work for refocusing the Northwest upon the need for action on DW cleanup at Hanford. In going well beyond NEPA requirements for public involvement in agency decision making, DOE-Richland demonstrated innovative ways of dealing with the difficult issues of public confidence and public trust by means of agency openness, responsiveness to citizen needs for information, and good faith two-way communication. The success of this pro-active DOE initiative was due to many factors including selecting the right issue (existing wastes), structuring the CF at a broad, regional level, and intensive implementation of trust-building strategies

  19. Accelerating cleanup: Paths to closure

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, C.

    1998-06-30

    This document was previously referred to as the Draft 2006 Plan. As part of the DOE`s national strategy, the Richland Operations Office`s Paths to Closure summarizes an integrated path forward for environmental cleanup at the Hanford Site. The Hanford Site underwent a concerted effort between 1994 and 1996 to accelerate the cleanup of the Site. These efforts are reflected in the current Site Baseline. This document describes the current Site Baseline and suggests strategies for further improvements in scope, schedule and cost. The Environmental Management program decided to change the name of the draft strategy and the document describing it in response to a series of stakeholder concerns, including the practicality of achieving widespread cleanup by 2006. Also, EM was concerned that calling the document a plan could be misconstrued to be a proposal by DOE or a decision-making document. The change in name, however, does not diminish the 2006 vision. To that end, Paths to Closure retains a focus on 2006, which serves as a point in time around which objectives and goals are established.

  20. Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly technical progress report 15, April--June 1996

    Energy Technology Data Exchange (ETDEWEB)

    Moro, N.; Shields, G.L.; Smit, F.J.; Jha, M.C.

    1996-07-25

    Goal is engineering development of two advanced physical fine coal cleaning processes, column flotation and selective agglomeration, for premium fuel applications. Scope includes laboratory research and bench-scale testing on 6 coals to optimize these processes, followed by design/construction/operation of a 2-t/hr PDU. During this quarter, parametric testing of the 30-in. Microcel{trademark} flotation column at the Lady Dunn plant was completed and clean coal samples submitted for briquetting. A study of a novel hydrophobic dewatering process continued at Virginia Tech. Benefits of slurry PSD (particle size distribution) modification and pH adjustment were evaluated for the Taggart and Hiawatha coals; they were found to be small. Agglomeration bench-scale test results were positive, meeting product ash specifications. PDU Flotation Module operations continued; work was performed with Taggart coal to determine scaleup similitude between the 12-in. and 6-ft Microcel{trademark} columns. Construction of the PDU selective agglomeration module continued.

  1. Hazardous materials in aquatic environments of the Mississippi River Basin Project management. Technical quarterly progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    McLachlan, J.; Ide, C.F.; O`Connor, S.

    1996-08-01

    This quarterly report summarizes accomplishments for the Project examining hazardous materials in aquatic environments of the Mississippi River Basin. Among the many research areas summarized are the following: assessment of mechanisms of metal-induced reproductive toxicity in aquatic species as a biomarker of exposure; hazardous wastes in aquatic environment;ecological sentinels of aquatic contamination in the lower Mississippi River System; remediation of selected contaminants; rapid on-site immunassay for heavy metal contamination; molecular mechanisms of developmental toxicity induced by retinoids and retinoid-like molecules; resuseable synthetic membranes for the removal of aromatic and halogenated organic pollutants from waste water; Effects of steroid receptor activation in neurendocrine cell of the mammalian hypothalamus; modeling and assessment of environmental quality of louisiana bayous and swamps; enhancement of environmental education. The report also contains a summary of publications resulting from this project and an appendix with analytical core protocals and target compounds and metals.

  2. Catalytic reduction of SO{sub 2} with methane over molybdenum catalyst. Quarterly technical report, September 1, 1994--November 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Wiltowski, T.

    1995-03-01

    One of the primary concerns in coal utilization is the emission of sulfur compounds, especially SO{sub 2}. This project deals with catalytic reduction of SO{sub 2} with methane using molybdenum sulfide catalyst supported on different activated carbons: Darco TRS, Norit ROZ-3, and an activated carbon prepared from Illinois coal IBC-110. The work conducted during this quarter has concentrated on catalyst preparation and characterization along with synthesis of activated carbon from IBC-110 coal, as well as, construction of the apparatus for catalytic tests of SO{sub 2} reduction with methane. It was found that Darco TRS supported catalysts have larger surface area than the pure activated carbon, whereas the impregnation of Norit ROZ-3 did not significantly change the BET surface area. Also, the synthesis of activated carbon support from IBC-110 is in progress.

  3. Materials compatibility and lubricants research on CFC-refrigerant substitutes. Quarterly MCLR program technical progress report, January 1, 1995--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Szymurski, S.R.; Hourahan, G.C.; Godwin, D.S.

    1995-04-01

    The Materials Compatibility and Lubricants Research (MCLR) program supports critical research to accelerate the introduction of CFC and HCFC refrigerant substitutes. The MCLR program addresses refrigerant and lubricant properties and materials compatibility. The primary elements of the work include data collection and dissemination, materials compatibility testing, and methods development. The work is guided by an Advisory Committee consisting of technical experts from the refrigeration and air-conditioning industry and government agencies. The Air-Conditioning and Refrigeration Technology Institute, Inc., (ARTI) manages and contracts multiple research projects and a data collection and dissemination effort. Detailed results from these projects are reported in technical reports prepared by each subcontractor.

  4. Post-accident cleanup of radioactivity at the Three Mile Island Nuclear Power Station

    International Nuclear Information System (INIS)

    The technical staff of the President's Commission on the Accident at Three Mile Island (TMI) requested that Oak Ridge National Laboratory (ORNL) prepare documentation concerned with the cleanup of radioactivity on the Three Mile Island site following the March 28, 1979 accident. The objective of this report is to provide information in a summarized form, which will be of direct usefulness to the commissioners. The information contained herein includes discussion of on-site assistance and accomplishments following the accident, flowsheet development for the TMI recovery team (by the Technical Advisory Group), and the numerous reports already generated on the TMI cleanup and recovery

  5. Luminous Processes Co.: the cleanup of a low-level radioactive waste site

    International Nuclear Information System (INIS)

    Luminous Processes Co., located in Athens, Georgia, painted luminous watch dials and clock faces with paint containing radium-226 and tritium. Following bankruptcy, Luminous left the site in a contaminated condition. The State of Georgia ultimately declared the site their number one priority for cleanup under Superfund. In the bidding process, O.H. Materials Co., of Findlay, Ohio, was judged as having the most technically superior cleanup approach in addition to being the low bidder. Decontamination of the site included excavation of soil adjacent to the main building, removal of interior walls and fixtures from inside the building, and decontamination of various items on the premises. The decontamination of the site was successfully completed, well under budget. All cleanup objectives were met and the site was rehabilitated without a single incident of exposure to any of the participants in the cleanup operation

  6. Federal Assistance Program Quarterly Project Progress Report. Geothermal Energy Program: Information Dissemination, Public Outreach, and Technical Analysis Activities. Reporting Period: January 1 - March 31, 2001 [Final report

    Energy Technology Data Exchange (ETDEWEB)

    Lund, John W.

    2002-03-22

    The final report of the accomplishments of the geothermal energy program: information dissemination, public outreach and technical analysis activities by the project team consisting of the Geo-Heat Center, Geothermal Resources Council, Geothermal Education Office, Geothermal Energy Association and the Washington State University Energy Program.

  7. Development of a new chemical technology for cleanup of VVER steam generators

    International Nuclear Information System (INIS)

    As shows the maintenance experience of SG's, the long-time maintenance them without chemical cleanup on secondary-side results in accumulation of considerable amounts of depositions of oxides of iron with a high content of copper on outside of tubes. The deposit accumulation creates conditions for concentrating of salts which promote corrosion and, then, the loosing of inter-contour tightness. Therefore the experts do not have any doubts in necessity of chemical cleanups and the chemical cleanups were carried out at some NPP's with VVER during last years. However it is possible to say, that these cleanups were carried out not by the best mode - the same main reagents had been used in order to dissolve the copper and iron oxides. For example, all cleanups at Balakovo NPP in 1996-1997 years had the common deficiency - even during 5. final stage of process the copper prolongs to be washed. By our opinion, the reasons of it are the poor scientific and technical justification of this process. Therefore at various NPP's with VVER cleanups realize by various techniques. The process of chemical cleanup, close to offered in the present work, was repeated many times utilized at BN-600 Belojarsk NPP and at BN-350 Shevtchenko NPP. The purposes of the present work are: 1. Research the behaviours of physicochemical processes during dissolution of components of depositions and their mixtures with use of the various formulas; 2. Analysis of the carried out chemical cleanups of PGV-1000M at an example of Balakovo NPP; 3. Development of a new process of SG's cleanup on the base of experimental researches and analysis; 4. Check of this process on the samples of full-scale depositions from SG Balakovo NPP. (authors)

  8. Development of a new chemical technology for cleanup of VVER steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Smykov, V.B.; Yermolaev, N.P. [IPPE, Obninsk (Russian Federation); Ivanov, V.N. [Balakovo NPP (Russian Federation)

    2002-07-01

    As shows the maintenance experience of SG's, the long-time maintenance them without chemical cleanup on secondary-side results in accumulation of considerable amounts of depositions of oxides of iron with a high content of copper on outside of tubes. The deposit accumulation creates conditions for concentrating of salts which promote corrosion and, then, the loosing of inter-contour tightness. Therefore the experts do not have any doubts in necessity of chemical cleanups and the chemical cleanups were carried out at some NPP's with VVER during last years. However it is possible to say, that these cleanups were carried out not by the best mode - the same main reagents had been used in order to dissolve the copper and iron oxides. For example, all cleanups at Balakovo NPP in 1996-1997 years had the common deficiency - even during 5. final stage of process the copper prolongs to be washed. By our opinion, the reasons of it are the poor scientific and technical justification of this process. Therefore at various NPP's with VVER cleanups realize by various techniques. The process of chemical cleanup, close to offered in the present work, was repeated many times utilized at BN-600 Belojarsk NPP and at BN-350 Shevtchenko NPP. The purposes of the present work are: 1. Research the behaviours of physicochemical processes during dissolution of components of depositions and their mixtures with use of the various formulas; 2. Analysis of the carried out chemical cleanups of PGV-1000M at an example of Balakovo NPP; 3. Development of a new process of SG's cleanup on the base of experimental researches and analysis; 4. Check of this process on the samples of full-scale depositions from SG Balakovo NPP. (authors)

  9. Materials Compatibility and Lubricants Research on CFC-refrigerant substitutes. Quarterly MCLR Program technical progress report, July 1--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Szymurski, S.R.; Hourahan, G.C.; Godwin, D.S.; Amrane, K.

    1995-10-01

    The Materials Compatibility and Lubricants Research (MCLR) program supports critical research to accelerate the introduction of CFC and HCFC refrigerant substitutes. The MCLR program addresses refrigerant and lubricant properties and materials compatibility. The primary elements of the work include data collection and dissemination, materials compatibility testing, and methods development. This report summarizes the research conducted during the third quarter of calendar year 1995 on the following projects: Thermophysical properties of HCFC alternatives; Compatibility of manufacturing process fluids with HFC refrigerants and ester lubricants; Compatibility of motor materials used in air-conditioning for retrofits with alternative refrigerants and lubricants; Compatibility of lubricant additives with HFC refrigerants and synthetic lubricants; Products of motor burnouts; Accelerated test methods for predicting the life of motor materials exposed to refrigerant-lubricant mixtures; Investigation of flushing and clean-out methods; Investigation into the fractionation of refrigerant blends; Lean flammability limits as a fundamental refrigerant property; Effect of selected contaminants in AC and R equipment; Study of foaming characteristics; Study of lubricant circulation in systems; Evaluation of HFC-245ca for commercial use in low pressure chillers; Infrared analysis of refrigerant mixtures; Refrigerant database; Refrigerant toxicity survey; Thermophysical properties of HFC-32, HFC-123, HCFC-124 and HFC-125; Thermophysical properties of HFC-143a and HFC-152a; Theoretical evaluations of R-22 alternative fluids; Chemical and thermal stability of refrigerant-lubricant mixtures with metals; Miscibility of lubricants with refrigerants; Viscosity, solubility and density measurements of refrigerant-lubricant mixtures; Electrohydrodynamic enhancement of pool and in-tube boiling of alternative refrigerants; Accelerated screening methods; and more.

  10. Development of molten carbonate fuel cell power plant technology. Quarterly technical progress report No. 1, October 1, 1979-December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Healy, H. C.; Sanderson, R. A.; Wertheim, R. J.; Farris, P. F.; Mientek, A. P.; Nickols, R. C.; Katz, M.; Iczkowski, R. P.; Fredley, R. R.; Stewart, R. C.; Kunz, H. R.; Gruver, G. A.; Bregoli, L. J.; Smith, S. W.; Steuernagel, W. H.; Szymanski, S. T.

    1980-03-01

    The overall objective of this 29-month program is to develop and verify the design of a prototype molten carbonate fuel cell stack which meets the requirements of 1990's competitive coal-fired electrical utility central station or industrial cogeneration power plants. During the first quarter, effort was initiated in all four major task areas: Task 1 - system studies to define the reference power plant design; Task 2 - cell and stack design, development and verification; Task 3 - preparation for fabrication and testing of the full-scale prototype stack; and Task-4 developing the capability for operation of stacks on coal-derived gas. In the system study task, a study baseline fuel cell system and module configuration were established. Studies to determine user requirements and to characterize the fuel cell power block and coal gasifier subsystems were initiated. Cell stack design was initiated with completion of preliminary design requirements for the cell cathodes. Laboratory tests were also initiated to identify alternative materials for separator plates, reactant manifold seals, and electrolyte tile fillers. A mechanical tape casting technique for producing 18 x 24 inch sheets of electrolyte matrix tape was successfully demonstrated in Task 3. In Task 4, theoretical and experimental studies were initiated to define the effects of known sulfur contaminants on cell performance. A literature survey was initiated to identify other possible contaminants. Planning and design efforts for construction of a mobile cell test unit were initiated. The mobile unit will be used to verify the molten carbonate cell's ability to operate on gasified coal by tests at a gasifier site.

  11. Surfactant loss control in chemical flooding: Spectroscopic and calorimetric study of adsorption and precipitation on reservoir minerals. Quarterly technical progress report, April 1, 1993--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Somasundaran, P.

    1993-08-31

    The aim of this contract is to elucidate the mechanisms underlying adsorption and surface precipitation of flooding surfactants on reservoir minerals. The results of this study should help in controlling surfactant loss in chemical flooding and also in developing optimum structures and conditions for efficient chemical flooding processes. Adsorption of single surfactants on silica and alumina as well as the solution behavior of surfactant mixtures was studied during this quarter. The adsorption of surfactants at the solid-liquid interface was correlated with changes in interfacial behavior such as wettability and zeta potential. Surface tension was used to study interactions between surfactant mixtures in solution. Mixed micellization of sodium dodecyl sulfate and dodecyl phenoxy polyethoxylated alcohol was found to be non-ideal. Regular solution theory adequately describes the interactions. The adsorption isotherm of a cationic surfactant, tetradecyl trimethyl ammonium chloride (TTAC), on alumina was determined at two values of pH. Changes in the settling rate of alumina suspensions after TTAC adsorption were also followed to describe the evolution of the adsorbed layer. At high surface coverage it was observed that the alumina surface became hydrophilic suggesting the formation of a TTAC bilayer at the surface. Wettability of silica after adsorption of nonyl phenyl polyethoxylated alcohols (with number of polyethylene oxide groups varying from 10-40) was measured using flotation to determine the orientation of the adsorbed layer. Effect of number of ethylene oxide groups was also determined. The amount of silica floated after the nonionic surfactant adsorption was same irrespective of the ethylene oxide chain length.

  12. Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly technical progress report 9, October 1, 1994--December 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Moro, N.; Shields, G.L.; Smit, F.J.; Jha, M.C. [AMAX Research and Development Center, Golden, CO (United States)

    1995-01-25

    The primary goal of this project is the engineering development of two advanced physical fine coal cleaning processes, column flotation and selective agglomeration, for premium fuel applications. The project scope includes laboratory research and bench-scale testing on six coals to optimize these processes, followed by design, and construction of a 2-t/hr process development unit (PDU). The PDU will then be operated to generate 200 ton lots of each of three project coals, by each process. The project began in October, 1992 and is scheduled for completion by March, 1997. During Quarter 9 (October--December, 1995), parametric and optimization testing was completed for the Taggart, Sunnyside, and Indiana VII coal using a 12-inch Microcel{trademark} flotation column. The detailed design of the 2-t/hr PDU grinding, flotation, and dewatering circuits neared completion with the specification of the major pieces of capital equipment to be purchased for these areas. Selective agglomeration test work investigated the properties of various industrial grades of heptane for use during bench- and PDU-scale testing. It was decided to use a hydrotreated grade of commercial heptane due to its low cost and low concentration of aromatic compounds. The final Subtask 6.4 CWF Formulation Studies Test Plan was issued. A draft version of the Subtask 6.5 Preliminary Design and Test Plan Report was also issued, discussing the progress made in the design of the bench-scale selective agglomeration unit. PDU construction work moved forward through the issuing of 26 request for quotations and 21 award packages for capital equipment.

  13. Environmental guidance documents for exploration, development, Production, and transportation of crude oil and natural gas in texas: Quarterly technical report, January 1, 1997-March 31, 1997

    International Nuclear Information System (INIS)

    The following technical report provides a detailed status report of the DOE grant project entitled ''Environmental Guidance Documents for Exploration, Development, Production, and Transportation of Crude Oil and Natural Gas in Texas.'' The grant funding allocated is for the purpose of provided the Railroad Commission of Texas (Commission) with resources and capabilities to draft, publish and distribute documents that provide guidance to oil and gas operators on issues concerning oil and gas naturally occurring radioactive material (NORM) waste, oil and gas hazardous waste, remediation of crude oil spills, management of non-hazardous oil and gas wastes, and mechanical integrity testing of Class II injection and disposal wells

  14. Innovative Clean Coal Technology (ICCT): 500 MW demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. Technical progress report, fourth quarter 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-21

    This quarterly report discusses the technical progress of an Innovative Clean Coal Technology (ICCT) demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. The project is being conducted at Georgia Power Company`s Plant Hammond Unit 4 located near Rome, Georgia. The primary goal of this project is the characterization of the low NO{sub x} combustion equipment through the collection and analysis of long-term emissions data. A target of achieving fifty percent NO{sub x} reduction using combustion modifications has been established for the project. The project provides a stepwise retrofit of an advanced overfire air (AOFA) system followed by low NO{sub x} burners (LNB). During each test phase of the project, diagnostic, performance, long-term, and verification testing will be performed. These tests are used to quantify the NO{sub x} reductions of each technology and evaluate the effects of those reductions on other combustion parameters such as parameters such as particulate characteristics and boiler efficiency.

  15. Enhancing aquifer cleanup with reinjection

    International Nuclear Information System (INIS)

    Injection of water or steam, with or without chemical surfactants, is a common petroleum industry technique to enhance product recovery. In the geothermal industry, reinjection (reinjection is used to mean the injection of ground water that was previously injected) of heat- depleted subsurface fluids is commonly used to maintain reservoir pressure, thus prolonging field productivity. The use reinjection in ground-water remediation projects allows for the application of both traditional production field management and a variety of additional enhancements to the cleanup process. Development of the ideas in this paper was stimulated by an initial suggestion by Dr. Jacob Bear (personal discussions, 1990--1991) that reinjected water might be heated to aid the desorption process

  16. Public participation in the evaluation of innovative environmental cleanup technology

    International Nuclear Information System (INIS)

    Technologies for remediation of contamination are urgently needed to clean up US Department of Energy (DOE) sites across the country. DOE is managing a national program to develop, demonstrate, and deploy new technologies with promise to expedite this cleanup. The Integrated Demonstration for Cleanup of Volatile Organic Compounds at Arid Sites (VOC-Arid ID) is one such effort. Time and resources, however, are too limited to be invested in methods of remediation that will never be deployed because they have not been rigorously evaluated or because they face the withering opposition of stakeholders. Therefore the VOC-Arid ID is assessing technology both in terms of its technical effectiveness and its stakeholder acceptability. Only if a technology performs as required and is acceptable to regulators, users of technology, and the public will the VOC-Arid ID recommend its use. What distinguishes public involvement in the VOC-Arid ID is the direct influence stakeholders have on the design of technology demonstrations by working directly with technology developers. Stakeholders participated in defining the criteria with which innovative environmental cleanup technology is being evaluated. The integrated demonstration is committed to providing stakeholders with the information they've indicated they need to reach reasoned judgments about the use of specific cleanup technologies. A guiding principle of the VOC-Arid ID is that stakeholder participation improves the technologies being developed, enhances the acceptance of the technologies, and will lead to the broad and timely deployment of appropriate and effective methods of environmental remediation. The VOC-Arid ID has involved stakeholders from the host demonstration site, Hanford, Washington, and from other and sites where the ID technologies may be deployed

  17. HANFORD SITE RIVER CORRIDOR CLEANUP

    International Nuclear Information System (INIS)

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km2 Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal

  18. Assessment of research directions for high voltage direct current power systems. Quarterly technical progress report, October 1, 1978--December 31, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Long, W.F.

    1979-01-01

    Two Priority One activities have received major attention during this reporting period. Application credits for HVDC systems imbedded in ac links are expected to evolve out of a system study wherein dc is introduced into a system where the breakeven criterion is not satisfied. Alternative benefits of the dc link will be quantified in an attempt to develop an expanded economic basis for HVDC systems. HVDC circuit breaker development is being examined, as there appears to be a relationship between the acceptance of multiterminal dc systems and the availability of a dc breaker. At the present time there is a large technical gap between laboratory status and field availability. Further investigation of dc interruption techniques is recommended, together with the establishment of operating criteria and design specifications. A variety of other HVDC activities was undertaken, including proposal review, contract progress report assessment, inverter commutation with series capacitor assistance, and conference planning.

  19. Advanced atomization concept for CWF burning in small combustors. Phase 2, Quarterly technical progress report No. 3, 1 April 1991--30 June 1991

    Energy Technology Data Exchange (ETDEWEB)

    Heaton, H.; McHale, E.

    1991-12-31

    The present project involves the second phase of research on a new concept in coal-water fuel (CWF) atomization that is applicable to burning in small combustors. It is intended to address the most important problem associated with CWF combustion; i.e., production of small spray droplets in an efficient manner by an atomization device. Phase 1 of this work was successfully completed with the development of an opposed-jet atomizer that met the goals of the first contract. Performance as a function of operating conditions was measured, and the technical feasibility of the device established in the Atlantic Research Atomization Test Facility employing a Malvern Particle Size Analyzer. Testing then proceeded to a combustion stage in a test furnace at a firing rate of 0.5 to 1.5 MMBtu/H.

  20. Advanced development of fine coal desulfurization and recovery technology. Quarterly technical progress report, October 1, 1976--December 31, 1976. [53 references

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, R.W.; Wheelock, T.D.

    1977-02-01

    The improvement and technical development of promising methods for desulfurizing and recovering fine coal underway includes froth flotation, selective oil agglomeration, pelletization, and a chemical desulfurization process which involves leaching fine coal with a hot dilute solution of sodium carbonate containing dissolved oxygen under pressure. A preliminary assessment of the state of the art and review of the technical literature has been made. Equipment and apparatus have been assembled for small-scale laboratory experiments in froth flotation, oil agglomeration and chemical desulfurization. Preliminary froth flotation tests have been carried out on an Iowa coal to establish baseline data. Quite unexpectedly these tests indicated that aluminum nitrate may be an activator for coal because it served to increase the recovery of coal. Several potential flotation depressants for pyrite have been screened by measurement at the zeta potential and floatability of pyrite or coal in aqueous suspensions containing the potential depressants. The following reagents show some promise as pyrite depressants: ferric chloride, sodium cyanide, ammonium thiocyanate, and the disodium salt of ethylenediaminetetraacetic acid. Preliminary plans have been prepared for a continuous flow bench-scale system to demonstrate the process. This system will include equipment for grinding and pretreating the coal as well as equipment for demonstrating froth flotation, selective oil agglomeration and pelletization. An investigation of coal microstructure as it relates to coal beneficiation methods has also been initiated. The distribution of various forms of pyrite by size and crystal structure has been determined for two cannel samples of coal through application of scanning electron microscope techniques.

  1. Increasing waterflood reserves in the Wilmington oil field through improved reservoir characterization and reservoir management. Quarterly technical progress report, March 21, 1995--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, D.; Clarke, D. [Long Beach City Dept. of Oil Properties, CA (United States); Walker, S.; Phillips, C.; Nguyen, J. [Tidelands Oil Production Co. (United States); Moos, D. [Stanford Univ. (United States); Tagbor, K. [MPI (United States)

    1995-07-26

    The main objective of this project is the transfer of technologies, methodologies, and findings developed and applied in this project to other operators of Slope and Basin Clastic Reservoirs. This project will study methods to identify sands with high remaining oil saturation and to recomplete existing wells using advanced completion technology. The identification of the sands with high remaining oil saturation will be accomplished by developing a deterministic 3-D geologic model and by using a state of the art reservoir management computer software. The wells identified by the geologic and reservoir engineering work as having the best potential will be logged with a pulsed acoustic cased-hole logging tool. The application of the logging tools will be optimized in the lab by developing a rock-log model. The wells that are shown to have the best oil production potential will be recompleted. The recompletions will be optimized by evaluating short radius and ultra-short radius lateral recompletions. Technical progress is reported for the following tasks: Reservoir characterization; reservoir engineering; 3-D geologic modeling; pulsed acoustic logging; and technology transfer.

  2. Improvement of storage, handling, and transportability of fine coal. Quarterly technical progress report No. 5, January 1, 1995--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-21

    The Mulled Coal process was developed as a means of overcoming the adverse handling characteristics of wet fine coal without thermal drying. The process involves the addition of a low cost, harmless reagent to wet fine coal using off-the-shelf mixing equipment. Based on laboratory- and bench-scale testing, Mulled Coal can be stored, shipped, and burned without causing any of the plugging, pasting, carryback and freezing problems normally associated with wet coal. The objectives of this project are to demonstrate that: the Mulled Coal process, which has been proven to work on a wide range of wet fine coals at bench scale, will work equally well on a continuous basis, producing consistent quality at a convincing rate of production in a commercial coal preparation plant; the wet product from a fine coal cleaning circuit can be converted to a solid fuel form for ease of handling and cost savings in storage and rail car transportation; and a wet fine coal product thus converted to a solid fuel form, can be stored, shipped, and burned with conventional fuel handling, transportation, and combustion systems. During this reporting period, virtually all of the technical activities and progress was made in the areas of circuit installation and startup operations. Work in these activity areas are described.

  3. Direct-hydrogen-fueled proton-exchange-membrane (PEM) fuel cell system for transportation applications. Quarterly technical progress report No. 4, April 1, 1995--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Oei, D.

    1995-08-03

    This is the fourth Technical Progress Report for DOE Contract No. DE-AC02-94CE50389 awarded to Ford Motor Company on July 1, 1994. The overall objective of this contract is to advance the Proton-Exchange-Membrane (PEM) fuel cell technology for automotive applications. Specifically, the objectives resulting from this contract are to: (1) Develop and demonstrate on a laboratory propulsion system within 2-1/2 years a fully functional PEM Fuel Cell Power System (including fuel cell peripherals, peak power augmentation and controls). This propulsion system will achieve, or will be shown to have the growth potential to achieve, the weights, volumes, and production costs which are competitive with those same attributes of equivalently performing internal combustion engine propulsion systems; (2) Select and demonstrate a baseline onboard hydrogen storage method with acceptable weight, volume, cost, and safety features and analyze future alternatives; and (3) Analyze the hydrogen infrastructure components to ensure that hydrogen can be safely supplied to vehicles at geographically widespread convenient sites and at prices which are less than current gasoline prices per vehicle-mile; (4) Identify any future R&D needs for a fully integrated vehicle and for achieving the system cost and performance goals.

  4. HANFORD SITE CENTRAL PLATEAU CLEANUP COMPLETION STRATEGY

    Energy Technology Data Exchange (ETDEWEB)

    BERGMAN TB

    2011-01-14

    Cleanup of the Hanford Site is a complex and challenging undertaking. The U.S. Department of Energy (DOE) has developed a comprehensive vision for completing Hanford's cleanup mission including transition to post-cleanup activities. This vision includes 3 principle components of cleanup: the {approx}200 square miles ofland adjacent to the Columbia River, known as the River Corridor; the 75 square miles of land in the center of the Hanford Site, where the majority of the reprocessing and waste management activities have occurred, known as the Central Plateau; and the stored reprocessing wastes in the Central Plateau, the Tank Wastes. Cleanup of the River Corridor is well underway and is progressing towards completion of most cleanup actions by 2015. Tank waste cleanup is progressing on a longer schedule due to the complexity of the mission, with construction of the largest nuclear construction project in the United States, the Waste Treatment Plant, over 50% complete. With the progress on the River Corridor and Tank Waste, it is time to place increased emphasis on moving forward with cleanup of the Central Plateau. Cleanup of the Hanford Site has been proceeding under a framework defmed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In early 2009, the DOE, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency signed an Agreement in Principle in which the parties recognized the need to develop a more comprehensive strategy for cleanup of the Central Plateau. DOE agreed to develop a Central Plateau Cleanup Completion Strategy as a starting point for discussions. This DOE Strategy was the basis for negotiations between the Parties, discussions with the State of Oregon, the Hanford Advisory Board, and other Stakeholder groups (including open public meetings), and consultation with the Tribal Nations. The change packages to incorporate the Central Plateau Cleanup Completion Strategy were

  5. Use of decision analysis techniques to determine Hanford cleanup priorities

    International Nuclear Information System (INIS)

    In January 1991, the U.S. Department of Energy (DOE) Richland Field Office, Westinghouse Hanford Company, and the Pacific Northwest Laboratory initiated the Hanford Integrated Planning Process (HIPP) to ensure that technically sound and publicly acceptable decisions are made that support the environmental cleanup mission at Hanford. One of the HIPP's key roles is to develop an understanding of the science and technology (S and T) requirements to support the cleanup mission. This includes conducting an annual systematic assessment of the S and T needs at Hanford to support a comprehensive technology development program and a complementary scientific research program. Basic to success is a planning and assessment methodology that is defensible from a technical perspective and acceptable to the various Hanford stakeholders. Decision analysis techniques were used to help identify and prioritize problems and S and T needs at Hanford. The approach used structured elicitations to bring many Hanford stakeholders into the process. Decision analysis, which is based on the axioms and methods of utility and probability theory, is especially useful in problems characterized by uncertainties and multiple objectives. Decision analysis addresses uncertainties by laying out a logical sequence of decisions, events, and consequences and by quantifying event and consequence probabilities on the basis of expert judgments

  6. Mechanism involved in trichloroethylene-induced liver cancer: Importance to environmental cleanup. 1997 annual progress report

    International Nuclear Information System (INIS)

    'The Pacific Northwest National Lab. was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996. This section gives a summary of how each grant is addressing significant DOE cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is primarily focused in three areas-Tank Waste Remediation, Soil and Groundwater Cleanup, and Health Effects.'

  7. Mechanism involved in trichloroethylene-induced liver cancer: Importance to environmental cleanup. 1997 annual progress report

    Energy Technology Data Exchange (ETDEWEB)

    Bull, R.J.

    1997-06-01

    'The Pacific Northwest National Lab. was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996. This section gives a summary of how each grant is addressing significant DOE cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is primarily focused in three areas-Tank Waste Remediation, Soil and Groundwater Cleanup, and Health Effects.'

  8. Alternatives for Ground Water Cleanup

    Science.gov (United States)

    Hudak, P. F.

    Aquifer remediation is one of our most difficult environmental challenges; technological limitations and problems arising from the physical and chemical complexities of contaminated subsurface environments thwart our best efforts. A 19-member committee of leaders in environmental engineering, hydrogeology, epidemiology, environmental economics, and environmental policy has written an ambitious book that broadly addresses the groundwater remediation problem. Topics include site characterization, capabilities and limitations of pump-and-treat and alternative technologies, alternative goals for ground water cleanup, and policy implications.One of the book's strengths is its information base, which includes various public and private groups, data from 80 pump-and-treat sites, and an extensive literature review. The text is clearly written and well organized. Specific conclusions are stated at the end of each major chapter, and sound policy recommendations are offered at the end of the final chapter. An appendix summarizes pump-andtreat systems reviewed during the study. Several case studies, diagrams, and photographs effectively illustrate concepts and ideas conveyed in the text.

  9. Bioventing reduces soil cleanup costs

    International Nuclear Information System (INIS)

    An offshoot technology from soil venting, bioventing offers a win-win solution for soils contaminated with volatile organic compounds (VOCs) and nonvolatile contaminants such as diesel and fuel oil. Using low air flowrates through permeable soils, bioventing injects sufficient oxygen to support naturally-occurring bacteria, which biodegraded the VOCs and other contaminants into benign byproducts. Waste gas can be directly discharged to atmosphere without further treatment. This results in no offgas treatment required. Bioventing is a cost-effective alternative to traditional soil-venting techniques. Soil venting uses air to volatilize organic-compound contamination from the vadose zone, the unsaturated soil layer above groundwater. Unfortunately, this simple-and-fast approach creates a waste offgas that requires further treatment before discharge, thus adding significantly to overall project costs. In contrast, bioventing uses low air flowrates, which require lower capital and operating costs. No offgas treatment further reduces equipment and operating costs and often eliminates air permitting. As in all treatment strategies, the process must meet the cleanup objectives. Bioventing is an alternative technique making inroads into refining and petrochemical soil-remediation applications

  10. Increased leukemia risk in Chernobyl cleanup workers

    Science.gov (United States)

    A new study found a significantly elevated risk for chronic lymphocytic leukemia among workers who were engaged in recovery and clean-up activities following the Chernobyl power plant accident in 1986.

  11. Nuclear radiation cleanup and uranium prospecting

    Energy Technology Data Exchange (ETDEWEB)

    Mariella, Jr., Raymond P.; Dardenne, Yves M.

    2016-02-02

    Apparatus, systems, and methods for nuclear radiation cleanup and uranium prospecting include the steps of identifying an area; collecting samples; sample preparation; identification, assay, and analysis; and relating the samples to the area.

  12. Assessment, Cleanup and Redevelopment Exchange System (ACRES)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Assessment, Cleanup and Redevelopment Exchange System (ACRES) is an online database for Brownfields Grantees to electronically submit data directly to EPA.

  13. Bioavailability: implications for science/cleanup policy

    Energy Technology Data Exchange (ETDEWEB)

    Denit, Jeffery; Planicka, J. Gregory

    1998-12-01

    This paper examines the role of bioavailability in risk assessment and cleanup decisions. Bioavailability refers to how chemicals ''behave'' and their ''availability'' to interact with living organisms. Bioavailability has significant implications for exposure risks, cleanup goals, and site costs. Risk to human health and the environment is directly tied to the bioavailability of the chemicals of concern.

  14. HARVESTING EMSP RESEARCH RESULTS FOR WASTE CLEANUP

    International Nuclear Information System (INIS)

    The extent of environmental contamination created by the nuclear weapons legacy combined with expensive, ineffective waste cleanup strategies at many U.S. Department of Energy (DOE) sites prompted Congress to pass the FY96 Energy and Water Development Appropriations Act, which directed the DOE to: ''provide sufficient attention and resources to longer-term basic science research, which needs to be done to ultimately reduce cleanup costs'', ''develop a program that takes advantage of laboratory and university expertise, and'' ''seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective.'' In response, the DOE initiated the Environmental Management Science Program (EMSP)-a targeted, long-term research program intended to produce solutions to DOE's most pressing environmental problems. EMSP funds basic research to lower cleanup cost and reduce risk to workers, the public, and the environment; direct the nation's scientific infrastructure towards cleanup of contaminated waste sites; and bridge the gap between fundamental research and technology development activities. EMSP research projects are competitively awarded based on the project's scientific, merit coupled with relevance to addressing DOE site needs. This paper describes selected EMSP research projects with long, mid, and short-term deployment potential and discusses the impacts, focus, and results of the research. Results of EMSP research are intended to accelerate cleanup schedules, reduce cost or risk for current baselines, provide alternatives for contingency planning, or provide solutions to problems where no solutions exist

  15. Clean-up and disposal process of polluted sediments from urban rivers

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    In this paper, the discussion is concentrated on the properties of the polluted sediments and the combination of clean-up and disposal process for the upper layer heavily polluted sediments with good flowability. Based on the systematic analyses of various clean-up processes, a suitable engineering process has been evaluated and recommended. The process has been applied to the river reclamation in Yangpu District of Shanghai metropolis. An improved centrifuge is used for dewatering the dredged sludge,which plays an important role in the combination of clean-up and disposal process. The assessment of the engineering process shows its environmental and technical economy feasibility, which is much better than that of traditional dredging-disposal processes.

  16. Document image cleanup and binarization

    Science.gov (United States)

    Wu, Victor; Manmatha, Raghaven

    1998-04-01

    Image binarization is a difficult task for documents with text over textured or shaded backgrounds, poor contrast, and/or considerable noise. Current optical character recognition (OCR) and document analysis technology do not handle such documents well. We have developed a simple yet effective algorithm for document image clean-up and binarization. The algorithm consists of two basic steps. In the first step, the input image is smoothed using a low-pass filter. The smoothing operation enhances the text relative to any background texture. This is because background texture normally has higher frequency than text does. The smoothing operation also removes speckle noise. In the second step, the intensity histogram of the smoothed image is computed and a threshold automatically selected as follows. For black text, the first peak of the histogram corresponds to text. Thresholding the image at the value of the valley between the first and second peaks of the histogram binarizes the image well. In order to reliably identify the valley, the histogram is smoothed by a low-pass filter before the threshold is computed. The algorithm has been applied to some 50 images from a wide variety of source: digitized video frames, photos, newspapers, advertisements in magazines or sales flyers, personal checks, etc. There are 21820 characters and 4406 words in these images. 91 percent of the characters and 86 percent of the words are successfully cleaned up and binarized. A commercial OCR was applied to the binarized text when it consisted of fonts which were OCR recognizable. The recognition rate was 84 percent for the characters and 77 percent for the words.

  17. Hanford: A Conversation About Nuclear Waste and Cleanup

    International Nuclear Information System (INIS)

    The author takes us on a journey through a world of facts, values, conflicts, and choices facing the most complex environmental cleanup project in the United States, the U.S. Department of Energy's Hanford Site. Starting with the top-secret Manhattan Project, Hanford was used to create tons of plutonium for nuclear weapons. Hundreds of tons of waste remain. In an easy-to-read, illustrated text, Gephart crafts the story of Hanford becoming the world's first nuclear weapons site to release large amounts of contaminants into the environment. This was at a time when radiation biology was in its infancy, industry practiced unbridled waste dumping, and the public trusted what it was told. The plutonium market stalled with the end of the Cold War. Public accountability and environmental compliance ushered in a new cleanup mission. Today, Hanford is driven by remediation choices whose outcomes remain uncertain. It's a story whose epilogue will be written by future generations. This book is an information resource, written for the general reader as well as the technically trained person wanting an overview of Hanford and cleanup issues facing the nuclear weapons complex. Each chapter is a topical mini-series. It's an idea guide that encourages readers to be informed consumers of Hanford news, to recognize that knowledge, high ethical standards, and social values are at the heart of coping with Hanford's past and charting its future. Hanford history is a window into many environmental conflicts facing our nation; it's about building upon success and learning from failure. And therein lies a key lesson, when powerful interests are involved, no generation is above pretense. Roy E. Gephart is a geohydrologist and senior program manager at the Pacific Northwest National Laboratory, Richland, Washington. He has 30 years experience in environmental studies and the nuclear waste industry

  18. A software tool for soil clean-up technology selection

    International Nuclear Information System (INIS)

    Soil remediation is a difficult, time-consuming and expensive operation. A variety of mature and emerging soil remediation technologies is available and future trends in remediation will include continued competition among environmental service companies and technology developers, which will definitely result in further increase in the clean-up options. Consequently, the demand has enhanced developing decision support tools that could help the decision makers to select the most appropriate technology for the specific contaminated site, before the costly remedial actions are taken. Therefore, a software tool for soil clean-up technology selection is currently being developed with the aim of closely working with human decision makers (site owners, local community representatives, environmentalists, regulators, etc.) to assess the available technologies and preliminarily select the preferred remedial options. The analysis for the identification of the best remedial options is based on technical, financial, environmental, and social criteria. These criteria are ranked by all involved parties to determine their relative importance for a particular project. (author)

  19. HARVESTING EMSP RESEARCH RESULTS FOR WASTE CLEANUP

    Energy Technology Data Exchange (ETDEWEB)

    Guillen, Donna Post; Nielson, R. Bruce; Phillips, Ann Marie; Lebow, Scott

    2003-02-27

    The extent of environmental contamination created by the nuclear weapons legacy combined with expensive, ineffective waste cleanup strategies at many U.S. Department of Energy (DOE) sites prompted Congress to pass the FY96 Energy and Water Development Appropriations Act, which directed the DOE to: ''provide sufficient attention and resources to longer-term basic science research, which needs to be done to ultimately reduce cleanup costs'', ''develop a program that takes advantage of laboratory and university expertise, and'' ''seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective.'' In response, the DOE initiated the Environmental Management Science Program (EMSP)-a targeted, long-term research program intended to produce solutions to DOE's most pressing environmental problems. EMSP funds basic research to lower cleanup cost and reduce risk to workers, the public, and the environment; direct the nation's scientific infrastructure towards cleanup of contaminated waste sites; and bridge the gap between fundamental research and technology development activities. EMSP research projects are competitively awarded based on the project's scientific, merit coupled with relevance to addressing DOE site needs. This paper describes selected EMSP research projects with long, mid, and short-term deployment potential and discusses the impacts, focus, and results of the research. Results of EMSP research are intended to accelerate cleanup schedules, reduce cost or risk for current baselines, provide alternatives for contingency planning, or provide solutions to problems where no solutions exist.

  20. Retroactive insurance may fund TMI-2 cleanup

    International Nuclear Information System (INIS)

    A Pennsylvania task force recommended that nuclear utilities insure their plants with a mandatory national property insurance program. The proposed Nuclear Powerplant Property Damage Insurance Act of 1981 will cover the cleanup costs of onsite damage in excess of $350 million for a single accident ($50 million when private insurance is added on) and a ceiling of two billion dollars. Participation in the insurance pool would be in conjunction with licensing and would permit no grandfathering. Total payout for Three Mile Island-2 would cover 75% of the cleanup costs, the remainder to be apportioned among other parties. The insurance pool will have a $750 million goal supported by utility premiums

  1. Final report: Fuel spill cleanup at the Del Air Unit

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report summarizes the cleanup of a fuel spill on the Delair Unit of Great River NWR in 1994. Soil test results are provided, the cleanup process is summarized,...

  2. CONOCO DOLOMITE HOT GAS CLEANUP SYSTEM

    Science.gov (United States)

    This report analyzes a proposal that EPA sponsor a large-scale pilot plant to develop the Conoco (formerly Consol) Dolomite Hot Gas Clean-up system. The report includes a history of the prior development program, the technology involved comparisons with competitive technologies i...

  3. Experience in mining plutonium for soil cleanup

    International Nuclear Information System (INIS)

    Plutonium contamination from nuclear tests in 1962 is present at Johnston Atoll in soil throughout a 10-ha site. Since the middle 1980s, the Defense Nuclear Agency has been developing a mining operation to cleanup the contaminated soil. A plant now routinely mines plutonium from soil to make most of the soil clean and suitable for beneficial use. Before this initiative, the mining paradigm was to concentrate a valuable substance and leave waste tailings. Mining for cleanup represents a paradigm shift as it concentrates the radioactive substance for waste disposal and leaves the valuable substance, clean soil. The cleanup plant combines conventional mining and milling technology, radiation detection equipment, and microprocessor computer controls. A variety of technologies have been evaluated since the plant was first started in 1990. Success has come from soil sorters and classifiers. To May 1993, there were 37 weeks with some soil cleanup. The plant processed 17,000 tons of soil and made 98% clean. Production at 1,000 tons/week is routine. The plant concentrate will be further processed to reduce waste below 2%

  4. Evaluation of contaminated groundwater cleanup objectives

    International Nuclear Information System (INIS)

    The US Department of Energy's (DOE's) Environmental Restoration Program will be responsible for remediating the approximately 230 contaminated groundwater sites across the DOE Complex. A major concern for remediation is choosing the appropriate cleanup objective. The cleanup objective chosen will influence the risk to the nearby public during and after remediation; risk to remedial and non-involved workers during remediation; and the cost of remediation. This paper discusses the trends shown in analyses currently being performed at Oak Ridge National Laboratories' (ORNL's) Center for Risk Management (CRM). To evaluate these trends, CRM is developing a database of contaminated sites. This paper examines several contaminated groundwater sites selected for assessment from CRM's data base. The sites in this sample represent potential types of contaminated groundwater sites commonly found at an installation within DOE. The baseline risk from these sites to various receptors is presented. Residual risk and risk during remediation is reported for different cleanup objectives. The cost associated with remediating to each of these objectives is also estimated for each of the representative sites. Finally, the general trends of impacts as a function of cleanup objective will be summarized. The sites examined include the Savannah River site, where there was substantial ground pollution from radionuclides, oil, coal stockpiles, and other forms of groundwater contamination. The effects of various types of groundwater contamination on various types of future user is described. 4 refs., 3 figs., 2 tabs

  5. Radioactive Waste and Clean-up Division

    International Nuclear Information System (INIS)

    The main objectives of the Radioactive Waste and Clean-up division of SCK-CEN are outlined. The division's programme consists of research, development and demonstration projects and aims to contribute to the objectives of Agenda 21 on sustainable development in the field of radioactive waste and rehabilitation of radioactively contaminated sites

  6. Cleanups In My Community (CIMC) - Recovery Act Funded Cleanups, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Recovery Act Funded Cleanup sites as part of the CIMC web service. The American Recovery and Reinvestment Act was signed into law...

  7. Restoration principles and criteria: superfund program policy for cleanup at radiation contaminated sites

    International Nuclear Information System (INIS)

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) is responsible for implementing the long-term (non-emergency) portion of a key U.S. law regulating cleanup: the Comprehensive Environmental Response, Compensation and Liability Act, CERCLA, nicknamed 'Superfund'. The purpose of the Superfund program is to protect human health and the environment over the long term from releases or potential releases of hazardous substances from abandoned or uncontrolled hazardous waste sites. The focus of this paper is on Superfund, including how radiation is addressed by the Superfund program. This paper provides a brief overview of the approach used by EPA to conduct Superfund cleanups at contaminated sites, including those that are contaminated with radionuclides, to ensure protection of human health and the environment. The paper addresses how EPA Superfund determines if a site poses a risk to human health and the framework used to determine cleanup levels. The theme emphasized throughout the paper is that within the Superfund remediation framework, radioactive contamination is dealt with in a consistent manner as with chemical contamination, except to account for the technical differences between radionuclides and chemicals. This consistency is important since at every radioactively contaminated site being addressed under Superfund's primary program for long-term cleanup, the National Priorities List (NPL), chemical contamination is also present. (author)

  8. Studies of Plutonium Aerosol Resuspension at the Time of the Maralinga Cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Shinn, J

    2003-08-01

    ), prior to the cleanup (Johnston et al, 1992, Williams 1993, Johnston et al 1993, Burns et al 1994, Burns et al 1995). ARPANSA staff made major contributions to delineate the areas with Pu in the soil, to determine the degree of secondary soil contamination by fission products from nuclear testing, to measure Pu resuspension by wind erosion of the undisturbed soil, and to prepare assessments of the human health risk from residual soil Pu. In addition, ARPANSA supported the Maralinga cleanup to assure compliance with criteria set by an independent technical advisory committee. During the cleanup ARPANSA monitored the residual Pu in the soil and certified that the cleanup was complete according to the criteria. It was not the reduction in potential inhalation exposure that usually was the main driver of the cleanup, but the requirement to also remove individual hot particles and fragments. It is the residual microscopic particles of Pu in the soil, however, that have the potential for long-term human exposure. The resuspension of respirable-size Pu particles has been studied with specialized equipment at the Nevada Test Site (Gilbert et al 1988a, Gilbert et al 1988b, Shinn et al 1989, and Shinn 1992), and at Bikini and Enewetak in the Marshall Islands (Shinn et al 1997). These efforts were in large part contributed by the Health and Ecological Assessment Division, University of California, Lawrence Livermore National Laboratory (LLNL). The study reported here is a collaboration between ARPANSA and LLNL, and was jointly supported by the United States Department of Energy, and the Commonwealth of Australia Department of Primary Industry and Energy.

  9. GPU seeks new funding for TMI cleanup

    International Nuclear Information System (INIS)

    General Public Utilities (GPU) wants approval for annual transfer of money from base rate increases in other accounts to pay for the cleanup at Three Mile Island (TMI) until TMI-1 returns to service or the public utility commission takes further action. This proposal confirms fears of a delay in TMI-1 startup and demonstrates that the January negotiated settlement will produce little funding for TMI-2 cleanup. A review of the settlement terms outlines the three-step process for base rate increases and revenue adjustments after the startup of TMI-1, and points out where controversy and delays due to psychological stress make a new source of money essential. GPU thinks customer funding will motivate other parties to a broad-based cost-sharing agreement

  10. Cleanup around an old waste site

    International Nuclear Information System (INIS)

    42,500 m3 of contaminated soil were removed from off-site areas around an old, low-level radioactive waste site near Port Hope, Ontario. The cleanup was done by means of conventional excavation equipment to criteria developed by Eldorado specific to the land use around the company's waste management facility. These cleanup criteria were based on exposure analyses carried out for critical receptors in two different scenarios. The excavated soils, involving eight different landowners, were placed on the original burial area of the waste management facility. Measures were also undertaken to stabilize the soils brought on-site and to ensure that there would be no subsequent recontamination of the off-site areas

  11. Major clean-up effort in the ATLAS cavern

    CERN Multimedia

    Marzio Nessi

    On Tuesday 10 October, 58 ATLAS collaborators volunteered to give a hand for a major clean-up of the ATLAS detector prior to the toroid magnet ramp-up. This special task monopolised all of the technical coordination team and eight supervisors to oversee the volunteers who were assigned to two separate five-hour shifts. The volunteers removed all sorts of loose material inside and outside the detector, focusing mainly on potentially magnetic material lost inside the detector and dirt accumulated over several months, not to mention zillions of clipped cable ties! The technical crew provided 120 garbage bags and all were used. All sorts of material that had been lost inside the detector by various people was retrieved, in particular small tools which could potentially damage the detector, as well as metallic fillings hazardous for the electronics once the magnet will be ramped up. A more detailed inspection followed for all the inside of the detector, making sure the current on the magnet could be raised to 5KA ...

  12. Methodologies for estimating shoreline cleanup costs

    Energy Technology Data Exchange (ETDEWEB)

    Etkin, D.S. [Environmental Research Consulting, Winchester, MA (United States)

    2001-07-01

    Once oil from an offshore oil spill hits a shoreline, cleanup operations become more complicated, expensive and time consuming because shoreline and intertidal ecosystems are complex and susceptible to serious impacts both from oiling and response functions. This paper described and compared methodologies for estimating shoreline cleanup costs for hypothetical spill scenarios based on projected shoreline oiling from oil spill trajectory modelling and on the factors that influence cost. It is important to estimate cleanup costs in order to optimize the allocation of resources for shoreline response and restoration. The factors that influence the amount of work needed and resulting cost are the characteristics of the impacted shoreline, the type of oil that has been spilled, and the standards to which cleanup is conducted. The cost estimation methods described in this paper were based on algorithms derived from statistical analyses of historical oil spill cost data in the Environmental Research Consulting database. This included modelling of labour requirements for different types of shorelines and types of oils, as well as other research studies. It was noted that there are serious limitations to these cost estimation methods. These include the fact that vessel and facility response plans are required to address worst case scenarios which have never actually occurred in the US or anywhere else in the world. Some strategies were recommended for improving the modelling of shoreline response costs. It was suggested that the predicted costs should be adjusted to take into account variations in spill situations. Also, contingency plans stress the importance of keeping the oil off the shoreline with booms, skimmers and dispersants. 31 refs., 22 figs.

  13. Accelerating cleanup. Paths to closure Hanford Site

    International Nuclear Information System (INIS)

    This document was previously referred to as the Draft 2006 Plan. As part of the DOE's national strategy, the Richland Operations Office's Paths to Closure summarizes an integrated path forward for environmental cleanup at the Hanford Site. The Hanford Site underwent a concerted effort between 1994 and 1996 to accelerate the cleanup of the Site. These efforts are reflected in the current Site Baseline. This document describes the current Site Baseline and suggests strategies for further improvements in scope, schedule and cost. The Environmental Management program decided to change the name of the draft strategy and the document describing it in response to a series of stakeholder concerns, including the practicality of achieving widespread cleanup by 2006. Also, EM was concerned that calling the document a plan could be misconstrued to be a proposal by DOE or a decision-making document. The change in name, however, does not diminish the 2006 vision. To that end, Paths to Closure retains a focus on 2006, which serves as a point in time around which objectives and goals are established

  14. Reactor safety research programs. Quarterly progress report, January 1--March 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Romano, A.J. (comp.)

    1977-05-01

    The projects reported each quarter are the following: Gas Reactor Safety Evaluation, THOR Code Development, SSC Code Development, LMFBR and LWR Safety Experiments, Fast Reactor Safety Code Validation, Technical Coordination of Structural Integrity, and Fast Reactor Safety Reliability Assessment.

  15. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster dsplays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume II covers papers presented at sessions 5 and 6 on system for the production of synthesis gas, and on system for the production of power. All papers have been processed for inclusion in the Energy Data Base.

  16. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster displays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume I covers information presented at sessions 1 through 4 on systems for the production of Co-products and industrial fuel gas, environmental projects, and components and materials. Individual papers have been processed for the Energy Data Base.

  17. Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2: Gas Cleanup Design and Cost Estimates -- Wood Feedstock

    Energy Technology Data Exchange (ETDEWEB)

    Nexant Inc.

    2006-05-01

    As part of Task 2, Gas Cleanup and Cost Estimates, Nexant investigated the appropriate process scheme for treatment of wood-derived syngas for use in the synthesis of liquid fuels. Two different 2,000 metric tonne per day gasification schemes, a low-pressure, indirect system using the gasifier, and a high-pressure, direct system using gasification technology were evaluated. Initial syngas conditions from each of the gasifiers was provided to the team by the National Renewable Energy Laboratory. Nexant was the prime contractor and principal investigator during this task; technical assistance was provided by both GTI and Emery Energy.

  18. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  19. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  20. EMSL Quarterly Highlights Report: 1st Quarter, FY08

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-01-28

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  1. Development of a risk-based approach to Hanford site cleanup

    International Nuclear Information System (INIS)

    In response to a request from Mr. Thomas Grumbly, Assistant Secretary of Energy for Environmental Management, the Hanford Site contractors developed a set of risk-based cleanup strategies that (1) protect the public, workers, and environment from unacceptable risks; (2) are executable technically; and (3) fit within currently expected annual funding profiles. These strategies were developed because (1) the U.S. Department of Energy and Hanford Site budgets are being reduced, (2) stakeholders are dissatisfied with the perceived rate of cleanup, (3) the U.S. Congress and the U.S. Department of Energy are increasingly focusing on risk and risk-reduction activities, (4) the present strategy is not integrated across the Site and is inconsistent in its treatment of similar hazards, (5) the present cleanup strategy is not cost-effective from a risk-reduction or future land use perspective, and (6) the milestones and activities in the Tri-Party Agreement cannot be achieved with an anticipated funding of 1.05 billion dollars, or less, annually. This analysis produced a framework and a set of tools that are available for dealing with changes to anticipated funding levels, changes in risk cleanup standards, and Congressional initiatives and inquiries. The tools include land-supply curves, cost profiles, risk profiles, mortgage reduction curves, and minimum operations costs. This paper describes the methodology used to develop mortgage-based, risk-based, and land-based cleanup strategies and how those strategies differ in terms of the work to be performed, its sequence, and the resulting end states

  2. Issues in UK cleanup and decommissioning; a strategic R and D programme

    International Nuclear Information System (INIS)

    Nexia Solutions is contracted to manage and carry out research on behalf of the Nuclear Decommissioning Authority (NDA). This paper will describe the nuclear research ongoing and how it fits in with the UK cleanup and decommissioning strategy. The aim of the strategic R and D programme is to assist the NDA in maintaining a technical portfolio which will:- - identify and address challenges and clean-up problems that do not have an existing solution; - resolve potential inconsistencies between sites in the technical bases for certain strategic decisions and their implementation; - maintain options while developing strategy (emerging risks); - save costs by developing multi-site solutions; - provide technology, skills and facilities on the timescale required. The strategy for the R and D programme has been developed from a top-level approach by understanding the challenges which need to be addressed and prioritising these according to the objectives of the programme. The programme has demonstrated that a technical portfolio comprising six areas, each containing a number of key themes, is appropriate to address the technical challenges which the NDA faces and aligns with the NDA's technical issues register. An important aspect of the R and D programme is that it should create opportunities for undertaking the NDA mission more effectively. This arises from the emphasis given in those technical programmes which define the challenge more precisely and thus provide a platform from which to produce innovative solutions. The paper will present an overview of the strategic R and D programme along with the key technical programme areas. Examples will be provided of the technical work ongoing, and the results obtained so far. (author)

  3. Preplanning of early cleanup. Annual report 1996

    International Nuclear Information System (INIS)

    A pre-study 'Pre-planning of early cleanup after fallout of radioactive material' made by Studvik EcoSafe has pointed out the need and request for pre-planning of actions. Based on the pre-study this project was started with the goal to work out guidelines and checklists. Because of the common interest between the Nordic countries NKS is the organization responsible for the project. The results of the project will be a document pointing out what can be planned in advance, including guidelines and checklists, regarding early cleanup actions after a nuclear plant accident in or in the vicinity of the Nordic countries. In this work 'early' means the three first weeks after an accident. The project only deals with questions concerning external radiation. The document shall be usable by persons in charge of planning or decision makers on the appropriate level of organization for each country. The document shall principally be aimed towards persons without professional competence in the field of radiology. The result will be presented for a limited number of generalized environments and fallout situations: urban/suburban/rural (concentrating on urban/suburban); regional differences (in for example house types and constructing material); dry or wet deposition. Five housing environments, ten cleanup actions and wet or dry deposition are treated. For 66 combinations calculations are made and the results are documented as data sheets, each describing the beneficial effects, costs and disadvantages of application of a feasible method for cleaning in the early phase of a specific type of surface in one of five different urban or suburban environments. This data forms the foundation for the recommendations on guidelines, which are the ultimate goal of the EKO-5 project. (EG)

  4. Shoreline clean-up methods : biological treatments

    Energy Technology Data Exchange (ETDEWEB)

    Massoura, S.T. [Oil Spill Response Limited, Southampton (United Kingdom)

    2009-07-01

    The cleanup of oil spills in shoreline environments is a challenging issue worldwide. Oil spills receive public and media attention, particularly in the event of a coastal impact. It is important to evaluate the efficiency and effectiveness of cleanup methods when defining the level of effort and consequences that are appropriate to remove or treat different types of oil on different shoreline substrates. Of the many studies that have compared different mechanical, chemical and biological treatments for their effectiveness on various types of oil, biological techniques have received the most attention. For that reason, this paper evaluated the effectiveness and effects of shoreline cleanup methods using biological techniques. It summarized data from field experiments and oil spill incidents, including the Exxon Valdez, Sea Empress, Prestige, Grand Eagle, Nakhodka, Guanabara Bay and various Gulf war oil spills. Five major shoreline types were examined, notably rocky intertidal, cobble/pebble/gravel, sand/mud, saltmarsh, and mangrove/sea-grass. The biological techniques that were addressed were nutrient enrichment, hydrocarbon-utilizing bacteria, vegetable oil biosolvents, plants, surf washing, oil-particle interactions and natural attenuation. The study considered the oil type, volume and fate of stranded oil, location of coastal materials, extent of pollution and the impact of biological techniques. The main factors that affect biodegradation of hydrocarbons are the volume, chemical composition and weathering state of the petroleum product as well as the temperature, oxygen availability of nutrients, water salinity, pH level, water content, and microorganisms in the shoreline environment. The interaction of these factors also affect the biodegradation of oil. It was concluded that understanding the fate of stranded oil can help in the development of techniques that improve the weathering and degradation of oil on complex shoreline substrates. 39 refs.

  5. Oil spill cleanup method and apparatus

    Energy Technology Data Exchange (ETDEWEB)

    Mayes, F.M.

    1980-06-24

    A method for removing oil from the surface of water where an oil spill has occurred, particularly in obstructed or shallow areas, which comprises partially surrounding a hovercraft with a floating oil-collecting barrier, there being no barrier at the front of the hovercraft, moving the oil-barrier-surrounded-hovercraft into oil contaminated water, and collecting oil gathered within the barrier behind the hovercraft through a suction line which carries the oil to a storage tank aboard the hovercraft. The invention also embodies the hovercraft adapted to effect an oil spill cleanup.

  6. Landfill gas cleanup for fuel cells

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    EPRI is to test the feasibility of using a carbonate fuel cell to generate electricity from landfill gas. Landfills produce a substantial quantity of methane gas, a natural by-product of decaying organic wastes. Landfill gas, however, contains sulfur and halogen compounds, which are known contaminants to fuel cells and their fuel processing equipment. The objective of this project is to clean the landfill gas well enough to be used by the fuel cell without making the process prohibitively expensive. The cleanup system tested in this effort could also be adapted for use with other fuel cells (e.g., solid oxide, phosphoric acid) running on landfill gas.

  7. High-level waste vitrification off-gas cleanup technology

    International Nuclear Information System (INIS)

    This brief overview is intended to be a basis for discussion of needs and problems existing in the off-gas clean-up technology. A variety of types of waste form and processes are being developed in the United States and abroad. A description of many of the processes can be found in the Technical Alternative Documents (TAD). Concurrently, off-gas processing systems are being developed with most of the processes. An extensive review of methodology as well as decontamination factors can be found in the literature. Since it is generally agreed that the most advanced solidification process is vitrification, discussion here centers about the off-gas problems related to vitrification. With a number of waste soldification facilities around the world in operation, it can be shown that present technology can satisfy the present requirement for off-gas control. However, a number of areas within the technology base show potential for improvement. Fundamental as well as verification studies are needed to obtain the improvements

  8. Technical Workers in Great Demand

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    The Labor and Social Security Ministry conducted a survey on 81 labor markets across China in the second quarter of this year, the results of which showed that the demand for technical workers, especially those of middle and senior titles, far outnumbers the supply.The survey shows that the demand/supply

  9. Design of the JAERI Fuel Cleanup System for the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    TSTA is operated under the US-Japan collaboration program for the study of fusion fuel cycle technology. A plasma exhaust processing subsystem, JAERI Fuel Cleanup (JFCU) was fabricated in Japan, and installed at the TSTA as a major subsystem of the TSTA loop under the agreement. This process is based on some Japanese developed components, and designed to meet TSTA requirements by both parties. This document describes all the technical and safety features in accordance with the LANL QA format. The process has a capability to process simulated plasma exhaust at the flow rate of 15 mol/h, that is 1/5 for ITER. (author)

  10. Bioavailability: implications for science/cleanup policy; FINAL

    International Nuclear Information System (INIS)

    This paper examines the role of bioavailability in risk assessment and cleanup decisions. Bioavailability refers to how chemicals ''behave'' and their ''availability'' to interact with living organisms. Bioavailability has significant implications for exposure risks, cleanup goals, and site costs. Risk to human health and the environment is directly tied to the bioavailability of the chemicals of concern

  11. Architecture synthesis basis for the Hanford Cleanup system: First issue

    International Nuclear Information System (INIS)

    This document describes a set of candidate alternatives proposed to accomplish the Hanford Cleanup system functions defined in a previous work. Development of alternatives is part of a sequence of system engineering activities which lead to definition of all the products which, when completed, accomplish the cleanup mission. The alternative set is developed to functional level four or higher depending on need

  12. Hanford Federal Facility Agreement and Consent Order quarterly progress report for the period ending June 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This is the ninth quarterly report as required by the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1990), also known as the Tri-Party Agreement, established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The Tri-Party Agreement sets the plan and schedule for achieving regulatory compliance and cleanup of waste sites at the Hanford Site. This report covers progress for the quarter that ended June 30, 1991. A total of 87 milestones have been completed to date. 39 refs., 1 fig.

  13. Saudis map $450 million gulf spill cleanup

    International Nuclear Information System (INIS)

    This paper reports on Saudi Arabia which has earmarked about $450 million to clean up Persian Gulf beaches polluted by history's worst oil spills, created during the Persian Gulf crisis. Details of the proposed cleanup measures were outlined by Saudi environmental officials at a seminar on the environment in Dubai, OPEC News Agency reported. The seminar was sponsored by the Gulf Area Oil Companies Mutual Aid Organization, an environmental cooperative agency set up by Persian Gulf governments. Meantime, a Saudi government report has outlined early efforts designed to contain the massive oil spills that hit the Saudi coast before oil could contaminate water intakes at the huge desalination plants serving Riyadh and cooling water facilities at Al Jubail

  14. Improving oiled shoreline cleanup with COREXIT 9580

    Energy Technology Data Exchange (ETDEWEB)

    Fiocco, R.J.; Lessard, R.R. [Exxon Research and Engineering Co., Florham Park, NJ (United States); Canevari, G.P. [G.P. Canevari Associates, Cranford, NJ (United States)

    1996-08-01

    The cleanup of oiled shorelines has generally been by mechanical, labor-intensive means. The use of a chemical shoreline cleaner to assist in water-flushing oil from the surfaces can result in more complete and more rapid cleaning. Not only is the cleaning process more efficient, but it can also be less environmentally damaging since there is potentially much less human intrusion and stress on the biological community. This paper describes research and applications of COREXIT 9580 shoreline cleaner for treatment of oiled shorelines, including four recent applications in Puerto Rico, Bermuda, Texas and Nova Scotia. Research work on shoreline vegetation, such as mangroves, has also demonstrated the potential use of this product to save and restore oiled vegetation.

  15. Quarterly Report (QR1)

    OpenAIRE

    Loomis, Charles; O'Callaghan, David; Bégin, Marc-Elian; Floros, Evangelos; Caceres, Juan

    2010-01-01

    In the first quarter of the project, the participants have successfully laid the foundations for creating a stable, comprehensive, open-source cloud platform. The project has put in place the tools and processes to quickly build and expand the StratusLab distribution. Through dialog with targeted communities and through the partners' experience it has developed the initial architecture of the StratusLab distribution. The initial releases have been validated on the project's cloud infrastructu...

  16. EDF - Quarterly Financial Information

    International Nuclear Information System (INIS)

    EDF's sales in the first quarter of 2014 were euro 21.2 billion, down 3.9% from the first quarter of 2013. At constant scope and exchange rates, sales were down 4.2% due to mild weather conditions, which impacted sales of electricity in France, gas sales abroad and trading activities in Europe. UK sales were nonetheless sustained by B2B sales due to higher realised wholesale market prices. In Italy, sales growth was driven by an increase in electricity volumes sold. The first quarter of 2014 also saw the strengthening of the Group's financial structure with the second phase of its multi-annual hybrid funding programme (nearly euro 4 billion equivalent) as well as the issue of two 100-year bonds in dollars and sterling aimed at significantly lengthening average debt maturity. 2014 outlook and 2014-2018 vision: - EDF Group has confirmed its financial objectives for 2014; - Group EBITDA excluding Edison: organic growth of at least 3%; - Edison EBITDA: recurring EBITDA target of euro 1 billion and at least euro 600 million in 2014 before effects of gas contract re-negotiations; - Net financial debt / EBITDA: between 2x and 2.5x; - Pay-out ratio of net income excluding non-recurring items post-hybrid: 55% to 65%. The Group has reaffirmed its goal of achieving positive cash flow after dividends, excluding Linky, in 2018

  17. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1999

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K. [ed.

    1999-12-01

    Quarterly reports on the operation of Finnish NPPs describe events and observations relating to nuclear and radiation safety that the Finnish Radiation and Nuclear Safety Authority (STUK) considers safety significant. Safety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and the environment and tabulated data on the plants' production and load factors. All Finnish NPP units were in power operation for the whole second quarter of 1999, with the exception of the annual maintenance outages of the Olkiluoto plant units. The load factor average of the plant units in this quarter was 93.1%. Two events in this quarter were classified Level 1 on the INKS Scale. At Olkiluoto 1, a valve of the containment gas treatment system had been in an incorrect position for almost a month, owing to which the system would not have been available as planned in an accident. At Olkiluoto 2, main circulation pump work was done during the annual maintenance outage and a containment personnel air lock was briefly open in violation of the Technical Specifications. Water leaking out of the reactor in an accident could not have been directed to the emergency cooling system because it would have leaked out from the containment via the open personnel air lock. Other events in this quarter had no bearing on the nuclear or radiation safety of the plant units. The individual doses of NPP personnel and also radioactive releases off-site were well below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  18. Discrepancies Between Quarterly GDP Estimates

    OpenAIRE

    Adriaan M. Bloem

    1997-01-01

    Countries compiling quarterly estimates for gross domestic product (GDP) often use alternative approaches simultaneously. This may result in the publication of different measures of quarterly GDP and discrepancies between these measures. Such discrepancies are unavoidable, unless reconciliation takes place or the measures are mutually interdependent. This paper examines international practices in this respect, focusing on OECD member countries that publish quarterly GDP data. Of these, five p...

  19. Establishing the SECME Model in the District of Columbia. Quarterly report, September 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    Technical progress and Federal Cash Transaction reports are presented for the first quarter. The work has been valuable in providing opportunities for greater academic achievement in mathematics and science for minority students in the District of Columbia.

  20. Tephra fall clean-up in urban environments

    Science.gov (United States)

    Hayes, Josh L.; Wilson, Thomas M.; Magill, Christina

    2015-10-01

    Tephra falls impact urban communities by disrupting transport systems, contaminating and damaging buildings and infrastructures, and are potentially hazardous to human health. Therefore, prompt and effective tephra clean-up measures are an essential component of an urban community's response to tephra fall. This paper reviews case studies of tephra clean-up operations in urban environments around the world, spanning 50 years. It identifies methods used in tephra clean-up and assesses a range of empirical relationships between level of tephra accumulation and clean-up metrics such as collected tephra volume, costs, and duration of operations. Results indicate the volume of tephra collected from urban areas is proportional to tephra accumulation. Urban areas with small tephra accumulations (1,000 m3/km2 or an average of 1 mm thickness) may collect 50,000 m3/km2 or an average of 50 mm thickness) remove up to 80%. This relationship can inform impact and risk assessments by providing an estimate of the likely response required for a given tephra fall. No strong relationship was found between tephra fall accumulation and clean-up cost or duration for urban environments which received one-off tephra falls, suggesting that these aspects of tephra fall clean-up operations are context specific. Importantly, this study highlights the advantage of effective planning for tephra clean-up and disposal in potentially exposed areas.

  1. Research and evaluation of biomass resources/conversion/utilization systems (market/experimental analysis for development of a data base for a fuels from biomass model). Quarterly technical progress report, August 1, 1979-October 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Y.K.; Chen, Y.C.; Chen, H.C.; Nelson, E.T.; Stringer, R.P.

    1979-01-01

    Market analyses information now stored in the biomass feedstock data base includes for each species: feedstock amount by region and season in tons/year; heating values in Btu/lb for those feedstock for which published data are available, and; feedstock cost in $/mm Btu. Information now stored in the product data base includes for each product: product amount by region in mm Btu/year and product cost in $/mm Btu. Biomass characterization procedures have now been developed and these will be used to characterize approximately 100 biomass species. TGA analyses will be supplemented with a pyrogram and a pyrochromatogram to further characterize each biomass. Tests were run on the PDU in the fluidized bed mode to determine the effects of particle size on reaction time. Thirteen tests were run during this quarter to verify the results from previous testing. The PDU is being modified to accommodate future sustained runs. Allocation modeling program is now functional and being tested as data is provided to the feedstock and product data banks. A mathematical model has been developed by modifying the Texaco Entrained Bed Pilot Plant Gasifier Model to simulate biomass gasification in an Entrained Bed. Results are being evaluated. Models for other reaction modes are being evaluated. A biomass economic program has been developed to provide average product fuel costs using 15 thermochemical processes.

  2. Eye pathologies of Chernobyl clean-up workers

    International Nuclear Information System (INIS)

    Diseases of the nervous system and sense organs have become the most significant pathologies of Chernobyl clean-up workers during the last four years. The aim of this work was to evaluate the incidence of eye disorders among Chernobyl clean-up workers to provide more information for health specialists. During the last 10 years, the most common eye pathology has been angiopathia retinae, followed by myopia and cataracta. Statistical analyses showed that the clean-up workers have higher risk to develop angiopathia retinae than the control group. (author)

  3. Assessing mixtures risks for cleanup and stewardship

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) is responsible for addressing contamination from past research, production, and disposal activities at over 100 sites and facilities across the country. Use of emerging science to assess risks for these facilities is the key to defining appropriate solutions. Safely managing contamination is a priority to protect workers in the near term, and sustained protection is a priority for local communities over the long term. The Department conducts its environmental management program with input from a number of groups who have expressed concern about the safety of DOE sites over time and the possible conversion of some lands to other uses. In general, past facility activities and disposal operations have contaminated about 10% of the total collective area of DOE sites while surrounding lands have served as buffer zones. Portions of several sites have been released for other uses, such as wildlife preserves. Soil, surface water, and groundwater have been contaminated in most instances, and on-site waste disposal is targeted for many sites. Wastes and contamination that will remain in the environment are at the heart of ongoing future use and long-term management deliberations. For this reason, oversight groups and local citizens are scrutinizing the risk assessments being conducted to support decisions on final cleanup and long-term stewardship. Contaminants exist throughout the world not as individual chemicals but as combinations. The standard risk assessment process broadly applied to support cleanup decisions for contaminated sites is based on single-chemical analyses that do not consider joint toxicity. That is, possible nonadditive effects (commonly termed synergistic or antagonistic) of multiple exposures to multiple chemicals are not generally addressed. The U.S. Environmental Protection Agency (EPA) has been developing a process to assess risks of multiple chemicals (EPA 1990, 2000), but it is not yet being applied to address

  4. Central Plateau Cleanup at DOE's Hanford Site - 12504

    International Nuclear Information System (INIS)

    The discussion of Hanford's Central Plateau includes significant work in and around the center of the Hanford Site - located about 7 miles from the Columbia River. The Central Plateau is the area to which operations will be shrunk in 2015 when River Corridor cleanup is complete. This work includes retrieval and disposal of buried waste from miles of trenches; the cleanup and closure of massive processing canyons; the clean-out and demolition to 'slab on grade' of the high-hazard Plutonium Finishing Plant; installation of key groundwater treatment facilities to contain and shrink plumes of contaminated groundwater; demolition of all other unneeded facilities; and the completion of decisions about remaining Central Plateau waste sites. A stated goal of EM has been to shrink the footprint of active cleanup to less than 10 square miles by 2020. By the end of FY2011, Hanford will have reduced the active footprint of cleanup by 64 percent exceeding the goal of 49 percent. By 2015, Hanford will reduce the active footprint of cleanup by more than 90 percent. The remaining footprint reduction will occur between 2015 and 2020. The Central Plateau is a 75-square-mile region near the center of the Hanford Site including the area designated in the Hanford Comprehensive Land Use Plan Environmental Impact Statement (DOE 1999) and Record of Decision (64 FR 61615) as the Industrial-Exclusive Area, a rectangular area of about 20 square miles in the center of the Central Plateau. The Industrial-Exclusive Area contains the 200 East and 200 West Areas that have been used primarily for Hanford's nuclear fuel processing and waste management and disposal activities. The Central Plateau also encompasses the 200 Area CERCLA National Priorities List site. The Central Plateau has a large physical inventory of chemical processing and support facilities, tank systems, liquid and solid waste disposal and storage facilities, utility systems, administrative facilities, and groundwater monitoring

  5. Cleanup and decommissioning of a nuclear reactor after a severe accident

    International Nuclear Information System (INIS)

    Although the development of commercial nuclear power plants has in general been associated with an excellent record of nuclear safety, the possibility of a severe accident resulting in major fuel and core damage cannot be excluded and such accidents have in fact already occurred. For over a decade, IAEA publications have provided technical guidance and recommendations for post-accident planning to be considered by appropriate authorities. Guidance and recommendations have recently been published on the management of damaged nuclear fuel, sealing of the reactor building and related safety and performance assessment aspects. The present technical report on the cleanup and decommissioning of reactors which have undergone a severe accident represents a further publication in the series. Refs, figs and tabs.

  6. PROGRESS and CHALLENGES IN CLEANUP OF HANFORDS TANK WASTES

    International Nuclear Information System (INIS)

    The River Protection Project (RPP), which is managed by the Department of Energy (DOE) Office of River Protection (ORP), is highly complex from technical, regulatory, legal, political, and logistical perspectives and is the largest ongoing environmental cleanup project in the world. Over the past three years, ORP has made significant advances in its planning and execution of the cleanup of the Hartford tank wastes. The 149 single-shell tanks (SSTs), 28 double-shell tanks (DSTs), and 60 miscellaneous underground storage tanks (MUSTs) at Hanford contain approximately 200,000 m3 (53 million gallons) of mixed radioactive wastes, some of which dates back to the first days of the Manhattan Project. The plan for treating and disposing of the waste stored in large underground tanks is to: (1) retrieve the waste, (2) treat the waste to separate it into high-level (sludge) and low-activity (supernatant) fractions, (3) remove key radionuclides (e.g., Cs-137, Sr-90, actinides) from the low-activity fraction to the maximum extent technically and economically practical, (4) immobilize both the high-level and low-activity waste fractions by vitrification, (5) interim store the high-level waste fraction for ultimate disposal off-site at the federal HLW repository, (6) dispose the low-activity fraction on-site in the Integrated Disposal Facility (IDF), and (7) close the waste management areas consisting of tanks, ancillary equipment, soils, and facilities. Design and construction of the Waste Treatment and Immobilization Plant (WTP), the cornerstone of the RPP, has progressed substantially despite challenges arising from new seismic information for the WTP site. We have looked closely at the waste and aligned our treatment and disposal approaches with the waste characteristics. For example, approximately 11,000 m3 (2-3 million gallons) of metal sludges in twenty tanks were not created during spent nuclear fuel reprocessing and have low fission product concentrations. We plan to

  7. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects.

  8. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1997, mid-year progress report

    International Nuclear Information System (INIS)

    The Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996. This report gives a summary of how each grant is addressing significant DOE cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is primarily focused in three areas--Tank Waste Remediation, Soil and Groundwater Cleanup, and Health Effects

  9. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report

    International Nuclear Information System (INIS)

    Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects

  10. Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1997 mid-year progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996. This report gives a summary of how each grant is addressing significant DOE cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is primarily focused in three areas--Tank Waste Remediation, Soil and Groundwater Cleanup, and Health Effects.

  11. Fourth quarterly report 1976

    International Nuclear Information System (INIS)

    The 4th quarterly report 1976 describes activities which were carried out within the framework of the Fast Breeder project at the Gesellschaft fuer Kernforschung, Karlsruhe, or on its behalf. The sections refer to the following subjects: Fuel rod development; material studies and development; corrosion experiments and coolant analysis; physics experiments; reactor theory; fast breeder safety; instrumentation and signal processing for core control; effects on the environment; sodium technology experiments; thermo- and fluid-dynamic tests in gas; design studies concerning sodium-cooled breeders. (HR)

  12. Reactor cavity cleanup system shielded filter installation

    International Nuclear Information System (INIS)

    The Seabrook Station reactor cavity cleanup system provides a flow path for refueling pool purification and drain down during plant refueling evolutions. The original system design included refueling pool surface skimmers and drains, a skimmer pump, an unshielded duplex basket type pump suction strainer and interconnecting stainless steel piping. The piping design utilized socket welded joints in small bore pipe with diaphragm values installed in the horizontal pipe runs downstream of the skimmer pump. The previously installed unshielded strainer in addition to the skimmer pump downstream piping components were determined to be inconsistent with Seabrook's proactive approach to dose reduction. To be consistent with ALARA (As Low As Reasonably Achievable) policy, a plant design change was authorized to install a lead shielded filter unit as a replacement for the existing duplex strainer. This filter unit, which utilizes multiple micron rating disposable basket type cartridges, has a threefold function of protecting the skimmer pump from large solids, providing bulk filtration of activated corrosion products from the refueling water in order to minimize CRUD buildup in downstream components, and enabling retrieval of foreign material drawn into the refueling pool drains

  13. Oil spill cleanup for soft sediments

    International Nuclear Information System (INIS)

    A series of experimental trials are in progress to investigate the effectiveness and consequences of oil spill cleanup methods for areas of mud flats and salt marsh. Trials have shown that wheeled and tracked vehicles have limited utility. Field measurements of the load bearing capacity of the mud can show where such vehicles may be used. Lightweight hover craft provide a useful means of transport. Shallow-draft boats can have a useful transport role: whether such craft can be used depends on the local topography and tidal regime. The trials showed that practical problems associated with implementing low-pressure flushing operations (lack of water for flushing, recovery of the flushed oil) can be overcome - although the environmental effects have yet to be assessed. The use of straw matting as a sorbent material was also demonstrated. The objective of the first two phases of the project, reported here, was to select workable methods with a view to subsequently employing them in larger-scale trials. The environmental consequences of using the selected methods will be examined in the later trials

  14. Dillingham plan attacks oil spill cleanup problem

    Energy Technology Data Exchange (ETDEWEB)

    1970-07-27

    A detailed scheme has been proposed for combating oil spills in U.S. offshore waters, hopefully moving oil spill control out of its infancy and at least into the toddler stage. In a comprehensive one-year systems study for the American Petroleum Institute (API), the results of which were released this week, Dillingham Environmental Co., studied major past oil spills and analyzed equipment and control techniques currently available to deal with them. The project director and his 5-man group recommend a multicomponent scheme including booms, absorbents, sinking agents, and chemical dispersants for oil containment and cleanup. The first phase, definition of the nature and scope of the problem, includes analysis of past oil spills to determine the basic characteristics of major oil spills; delineation of geographic regions where oil spills are likely to occur; and analysis of how oil spills affect, and are affected by the environment. The Dillingham report examines the effect of past oil spills on the environment. It concludes that isolated oil spills do not appear to present a major environmental threat resulting in lasting damage.

  15. Cleanup of a jet fuel spill

    Science.gov (United States)

    Fesko, Steve

    1996-11-01

    Eaton operates a corporate aircraft hanger facility in Battle Creek, Michigan. Tests showed that two underground storage tanks leaked. Investigation confirmed this release discharged several hundred gallons of Jet A kerosene into the soil and groundwater. The oil moved downward approximately 30 feet and spread laterally onto the water table. Test results showed kerosene in the adsorbed, free and dissolved states. Eaton researched and investigated three clean-up options. They included pump and treat, dig and haul and bioremediation. Jet fuel is composed of readily biodegradable hydrocarbon chains. This fact coupled with the depth to groundwater and geologic setting made bioremediation the low cost and most effective alternative. A recovery well was installed at the leading edge of the dissolved contamination. A pump moved water from this well into a nutrient addition system. Nutrients added included nitrogen, phosphorous and potassium. Additionally, air was sparged into the water. The water was discharged into an infiltration gallery installed when the underground storage tanks were removed. Water circulated between the pump and the infiltration basin in a closed loop fashion. This oxygenated, nutrient rich water actively and aggressively treated the soils between the bottom of the gallery and the top of the groundwater and the groundwater. The system began operating in August of 1993 and reduced jet fuel to below detection levels. In August of 1995 The State of Michigan issued a clean closure declaration to the site.

  16. Molten metal, Martin Marietta target DOE, DOD cleanup markets

    International Nuclear Information System (INIS)

    This article describes a joint venture between Martin Marietta Corp. and Molten Metal Technology, Inc. to sell MMT innovative waste processing technology to the Energy and Defense departments, environmental cleanup programs

  17. The Secretary's Vision of the Cleanup Program

    Energy Technology Data Exchange (ETDEWEB)

    Golan, Paul

    2003-02-24

    This paper discusses the Secretary of Energy's vision of the cleanup program. Topics include development a new plan to swiftly clean up serious problems at sites and reduce the risks to human health, safety and the environment.

  18. Cleanup Verification Package for the 300-18 Waste Site

    International Nuclear Information System (INIS)

    This cleanup verification package documents completion of remedial action for the 300-18 waste site. This site was identified as containing radiologically contaminated soil, metal shavings, nuts, bolts, and concrete

  19. IMPROVED SILICA GEL CLEANUP METHOD FOR ORGANOPHOSPHORUS PESTICIDES

    Science.gov (United States)

    Quantitative recovery of some organophosphorus pesticide residues has not been possible with existing silica gel-cleanup procedures. The authors have developed a modification that permits quantitative recovery of all organophosphorus pesticides tested, except those with a carbama...

  20. Geographical information system (GIS) support for shoreline cleanup operations

    International Nuclear Information System (INIS)

    A GIS-based system was introduced which was capable of simplifying map production. The importance of an accurate map in shoreline cleanup operations was emphasized. Maps are used to analyze data and are also an effective communication tool, simplifying work coordination between teams. A GIS-based system allows spatial representations to be used much more extensively in integrating information. Two software products, SHORECLEAN and MAPINFO, were used to create a set of maps to be evaluated. The four main categories of tasks involved in shoreline operations were: (1) to collect data on the state of oiling, (2) to plan cleanup operations, (3) to keep track of cleanup operations, and (4) to monitor long-term changes in the state of the shoreline. It was suggested that electronic data captured directly with the portable computer on site on an oiled shoreline, helps accelerate the cleanup decision making process. 14 refs., 2 tabs., 8 figs

  1. Environmental Biosciences Program Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2009-01-30

    Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on several trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River

  2. Budgeting for environmental clean-up of Army bases

    OpenAIRE

    Goette, Herbert

    1996-01-01

    Approved for public release; distribution is unlimited The United States Army obtained congressional approval in 1995 to close or realign 40 installations. These actions create a unique opportunity for the civilian communities surrounding the installations to reuse them to satisfy commercial or community needs. However, future reuse can be impeded by the need for environmental clean-up, which is an expensive business. The current clean-up cost estimate for 32 of the 40 installations is $1 ...

  3. Optimal Discounting of Benefits From Cleanup at Waste Sites

    OpenAIRE

    Lyon, Kenneth S.; Caliendo, Frank

    2005-01-01

    This paper uses a general equilibrium optimal growth model to discuss the role of optimal discounting of future benefits from cleanup at high level toxic waste sites. Cleanup simultaneously generates two streams of benefits. One of these is directly from utility and the other is indirectly from the added productivity of workers. We note that the optimal discount rate is different for these two types of benefits. Along the optimal path, the former are discounted at the rate of time preference ...

  4. An investigation into improving non-NPS cleanup process.

    OpenAIRE

    Whitson, Mark E.

    1992-01-01

    Approved for public release; distribution is unlimited This research investigates the process required to remediate (cleanup) non-National Priorities List (non-NPL) hazardous waste sites. The research addresses the many laws and regulations on hazardous waste cleanup specific to Department of Defence and Navy processes to correct and remediate existing sites. The thesis gathered data through survey of the seven Engineering Field Divisions within the Naval Facilities Command organi...

  5. Cleanup Verification Package for the 118-F-2 Burial Ground

    International Nuclear Information System (INIS)

    This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-2 Burial Ground. This burial ground, formerly called Solid Waste Burial Ground No. 1, was the original solid waste disposal site for the 100-F Area. Eight trenches contained miscellaneous solid waste from the 105-F Reactor and one trench contained solid waste from the biology facilities

  6. Solvent degradation and cleanup: a survey and recent ORNL studies

    International Nuclear Information System (INIS)

    This paper surveys the mechanisms for degradation of the tributyl phosphate and diluent components of Purex solvent by acid and radiation, reviews the problems encountered in plant operations resulting from the presence of these degradation products, and discusses methods for minimizing the formation of degradation products and accomplishing their removal. Scrubbing solutions containing sodium carbonate or hydroxylamine salts and secondary cleanup of solvents using solid sorbents are evaluated. Finally, recommendations for improved solvent cleanup are presented. 50 references, 4 figures, 3 tables

  7. Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2: Gas Cleanup Design and Cost Estimates -- Black Liquor Gasification

    Energy Technology Data Exchange (ETDEWEB)

    Nexant Inc.

    2006-05-01

    As part of Task 2, Gas Cleanup and Cost Estimates, Nexant investigated the appropriate process scheme for removal of acid gases from black liquor-derived syngas for use in both power and liquid fuels synthesis. Two 3,200 metric tonne per day gasification schemes, both low-temperature/low-pressure (1100 deg F, 40 psi) and high-temperature/high-pressure (1800 deg F, 500 psi) were used for syngas production. Initial syngas conditions from each of the gasifiers was provided to the team by the National Renewable Energy Laboratory and Princeton University. Nexant was the prime contractor and principal investigator during this task; technical assistance was provided by both GTI and Emery Energy.

  8. LFCM vitrification technology. Quarterly progress report, October-December 1985

    Energy Technology Data Exchange (ETDEWEB)

    Burkholder, H.C.; Jarrett, J.H.; Minor, J.E. (comps.)

    1986-09-01

    This report is compiled by the Nuclear Waste Treatment Program and the Hanford Waste Vitrification Program at Pacific Northwest Laboratory to document progress on liquid-fed ceramic melter (LFCM) vitrification technology. Progress in the following technical subject areas during the first quarter of FY 1986 is discussed: melting process chemistry and glass development, feed preparation and transfer systems, melter systems, canister filling and handling systems, off-gas systems, process/product modeling and control, and supporting studies.

  9. THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND

    Energy Technology Data Exchange (ETDEWEB)

    JEWETT MA

    2011-01-14

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  10. Science To Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards; FINAL

    International Nuclear Information System (INIS)

    Pacific Northwest National Laboratory (PNNL) was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, nine in fiscal year 1998, seven in fiscal year 1999, and five in fiscal year 2000. All of the fiscal year 1996 award projects have published final reports. The 1997 and 1998 award projects have been completed or are nearing completion. Final reports for these awards will be published, so their annual updates will not be included in this document. This section summarizes how each of the 1999 and 2000 grants address significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. The 1999 and 2000 EMSP awards at PNNL are focused primarily in two areas: Tank Waste Remediation, and Soil and Groundwater Cleanup

  11. Clean-up at the ISR

    CERN Multimedia

    2001-01-01

    After six months of work, the part of the ISR coming under EP Division has been emptied and refurbished. The area is now ready to start building the LHC experiments. People who know the ISR from way back are likely to be surprised when they push open the doors to the old collider. Whereas the part of the tunnel allocated to EP (Experimental Physics) Division now stands empty, a few months ago, it was piled high with odds and ends. For more than 20 years, this part of the former Intersecting Storage Rings, a full quarter of the loop, had been used as storage space. Both items of value and pure junk had been dumped there, ranging from detector prototypes and 30 years old pumps with signs saying 'not to be thrown out', down to planks, a beautiful velvet armchair, and hundreds of electricity racks. Aloïs Girardoz, lost in the huge ISR hall, which will now be used for building the muon chambers of CMS. An audit carried out in 1996 on the research sector storage areas and accelerators signalled an end t...

  12. NRC quarterly [status] report

    International Nuclear Information System (INIS)

    This report covers the third quarter of calendar year 1987. The NRC licensing activity during the period of this report included the issuance of a full-power license for Beaver Valley 2 on August 14, 1987, and operating license restricted to five percent power for South Texas Unit 1 on August 21, 1987. Additional licensing delay for Shoreham is projected due to complex litigation. Also, licensing delay may occur for Comanche Peak Unit 1, because the duration of the hearing is uncertain. Although a license authorizing fuel loading and precriticality testing for Seabrook Unit 1 has been issued, there is a projected delay for low-power licensing. Full-power licensing for Seabrook Unit 1 will be delayed due to offsite emergency preparedness issues. The length of the delay is not known at this time. With the exception of Seabrook and Shoreham, regulatory delays in this report are not impacted by the schedules for resolving off-site emergency preparedness issues

  13. Environmental Hazards Assessment Program. Quarterly report, July--September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    The objectives of the EHAP program stated in the proposal to DOE are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication which recognizes the direct impact of environmental hazards on the health and well-being of all, (2) develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management.

  14. Quarterly coal report, July--September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

  15. Coordinating NRC License Closure/Termination and Army Corps of Engineers FUSRAP Cleanups

    International Nuclear Information System (INIS)

    Overlapping regulatory cleanup programs present a significant challenge for business entities seeking to close and redevelop properties in an environmentally-appropriate but cost-effective manner. In the nuclear decontamination context, this challenge has been recognized in Memoranda of Understanding ('MOUs') between regulators with overlapping responsibilities seeking to minimize duplicative efforts/costs while fulfilling their respective regulatory obligations. For instance, an MOU between the Army Corps of Engineers (the 'Corps') and the Nuclear Regulatory Commission ('NRC') for coordinating Corps' cleanups under the Formerly Utilized Sites Remedial Action Program ('FUSRAP') and NRC D and D to close and terminate an NRC license was reached in July 2001. Similarly, U.S. Environmental Protection Agency ('EPA') and NRC entered into an MOU in October 2002 addressing the interaction between NRC decontamination and decommissioning ('D and D') oversight and EPA's authority under the Comprehensive Environmental Response, Compensation and Liability Act ('CERCLA') at NRC-licensed sites. Yet, despite these MOU agreements, the simultaneous application of different regulatory programs, differing perspectives on their respective objectives and limited experience in addressing such circumstances often can lead to issues that demand creative solutions. This paper examines the interplay of these regulatory programs, the MOU of the agencies seeking to address their responsibilities under them and the coordination of the cleanups and license closure/termination process under the programs. It also offers technical and practical suggestions and insight to cost-effectively manage such efforts based on experiences with these programs and the regulators and stakeholders involved (at the federal, state and local levels). (authors)

  16. NST Quarterly. October 1996 issue

    International Nuclear Information System (INIS)

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in latex vulcanization (first RVNRL-based rubber gloves produced in Malaysia), tank floor scanning system (TAFLOSS), incineration and radiotherapeutic agent

  17. NST Quarterly. July 1996 issue

    International Nuclear Information System (INIS)

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in in-vitro mutagenesis of ornamental plants, soil erosion studies and animal feed production from agricultural waste

  18. Worldwide analysis of marine oil spill cleanup cost factors

    International Nuclear Information System (INIS)

    The many factors that influence oil spill response costs were discussed with particular emphasis on how spill responses differ around the world because of differing cultural values, socio-economic factors and labor costs. This paper presented an analysis of marine oil spill cleanup costs based on the country, proximity to shoreline, spill size, oil type, degree of shoreline oiling and cleanup methodology. The objective was to determine how each factor impacts per-unit cleanup costs. Near-shore spills and in-port spills were found to be 4-5 times more expensive to clean than offshore spills. Responses to spills of heavy fuels also cost 10 times more than for lighter crudes and diesel. Spill responses for spills under 30 tonnes are 10 times more costly than on a per-unit basis, for spills of 300 tonnes. A newly developed modelling technique that can be used on different types of marine spills was described. It is based on updated cost data acquired from case studies of more than 300 spills in 40 countries. The model determines a per-unit cleanup cost estimation by taking into consideration oil type, location, spill size, cleanup methodology, and shoreline oiling. It was concluded that the actual spill costs are totally dependent on the actual circumstances of the spill. 13 refs., 10 tabs., 3 figs

  19. Consolidating federal facility cleanup: Some pros and cons

    International Nuclear Information System (INIS)

    It has been suggested that Congress establish a permanent, full-time, independent national commission for radioactive waste management activities at DOE's Nuclear Weapons Complex. DOE regulates certain aspects of its treatment, storage, and disposal of radioactive waste by orders that are not promulgated by ''notice and comment'' or other procedures in the Administration Procedures Act. Because many agencies are not legally and technologically structured to handle their own cleanup problems, these activities might be conducted by one entity that can share information and staff among these agencies. There are rational arguments for both sides of this issue. Some of the advantages of such an organization include: focusing Congress's attention on an integrated federal facility cleanup instead of a fragmented, agency by agency approach, and an ability to prioritize cleanup decisions among agencies. Some significant obstacles include: reluctance by Congress and the executive branch to create any new bureaucracy at a time of budget deficits, and a loss of momentum from the progress already being made by the agencies. Given that more than $9 billion was proposed for FY 93 alone for federal facilities' cleanup programs and that decades will pass before all problems are addressed, it is appropriate to consider new approaches to environmental cleanup. This paper begins the dialogue about new ways to improve decision-making and government spending

  20. Yakama Indian Nation Treaty rights and development of cleanup standards for D and D and ER actions

    International Nuclear Information System (INIS)

    The Yakama Indian Nation (YIN) is a sovereign government located in the Northwestern United States. In 1855, the US government recognized Yakama Nation dominion on 12.2 million acres of land, or more than one-quarter of present-day Washington State. In the Treaty of 1855 between US and Yakama representatives, the YIN ceded control on 10.8 million acres of its ancestral land to the US government, but retained certain perpetual rights to that land. The Hanford Nuclear Site is located on Yakama ceded land, upon which the YIN retains rights to fish, hunt, gather roots and berries, and to pasture horses and cattle. The YIN has been recognized by the US Department of Energy as having regulatory authority concerning Hanford operations. This authority requires incorporation of YIN Treaty rights in the development of environmental cleanup standards for D and D and ER actions. The legal and policy framework upon which YIN environmental protection standards are based includes protection of the health, safety and well-being of YIN Tribal members, protection of the environment necessary to support Treaty protected resources, and preservation of the culture which sustains the unique YIN lifestyle and religion. The basis for Yakama cleanup standards will address risk, environmental, and cultural factors. It is recognized that the unique Yakama lifestyle and diet create specific exposure pathways for hazardous and radioactive materials which are not routinely factored into risk models used to calculate doses

  1. Environmental Biosciences Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2007-01-31

    In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems. Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this

  2. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL's Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed

  3. Implications of the KONVERGENCE Model for Difficult Cleanup Decisions

    Energy Technology Data Exchange (ETDEWEB)

    Piet, Steven James; Dakins, Maxine Ellen; Gibson, Patrick Lavern; Joe, Jeffrey Clark; Kerr, Thomas A; Nitschke, Robert Leon

    2002-08-04

    Abstract—Some cleanup decisions, such as cleanup of intractable contaminated sites or disposal of spent nuclear fuel, have proven difficult to make. Such decisions face high resistance to agreement from stakeholders possibly because they do not trust the decision makers, view the consequences of being wrong as too high, etc. Our project’s goal is to improve sciencebased cleanup decision-making. This includes diagnosing intractable situations, as a step to identifying a path toward sustainable solutions. Companion papers describe the underlying philosophy of the KONVERGENCE Model for Sustainable Decisions,1 and the overall framework and process steps.2 Where knowledge, values, and resources converge (the K, V, and R in KONVERGENCE), you will find a sustainable decision – a decision that works over time. For intractable cases, serious consideration of the adaptable class of alternatives is warranted – if properly implemented and packaged.

  4. Coolant clean-up method in PWR type reactors

    International Nuclear Information System (INIS)

    Purpose: To perform coolant clean-up while climinating the need of replacing boric acid with plant primary coolants and using anionic exchange resins in which the amount of Cl anionic exchange resins as impurities is decreased. Method: OH type anionic exchange resins are previously treated with an aqueous boric acid not containing radioactivity at a place other than the equipment for use (that is desalting tower) into boric acid type anionic ion exchange resins and, thereafter, the boric acid type anionic exchange resins are filled into a desalting tower of the clean-up system to perform primary coolant clean-up. In this case, since the resins can be used directly for the purpose without performing boric acid replacement after charging into the equipment for use, the procedures in the plant being in operation can be saved. (Yoshino, Y.)

  5. Interim Site Assessment and Clean-up Guidebook

    International Nuclear Information System (INIS)

    In April 1995 an Interim Site Investigation and Clean-up Guidebook (for petroleum hydrocarbon and volatile organic compound impacted sites) was developed for public use. The purpose of the Guidebook was to offer a new approach to the site cleanup process: one that reduces time, cuts costs, and establishes a defined endpoint for investigations and cleanup actions. The Guidebook provided a matrix to screen for low-risk contaminated sites. After a year of use, the Guidebook was revised in May 1996. The most notable change was in the Petroleum Hydrocarbon Section and the modification of the screening table for petroleum hydrocarbon contaminated sites. The changes considered the strong influence of lithology on contaminant transport and recognized the large attenuation of the long chain, heavy oil and tar, hydrocarbons in soils

  6. Uranium mill tailings cleanup: Federal leadership at last

    International Nuclear Information System (INIS)

    The Department of Energy has proposed legislation that would allow it to enter into cooperative agreements with various States to clean up residual radioactive materials--commonly called uranium mill tailings--at 22 inactive uranium mills. About 25 million tons of mill tailings have accumulated at these sites since the 1940s. GAO analyzed the need for, and adequacy of, the proposed legislation and recommends that the cleanup program be endorsed. While the Federal Government has no apparent legal responsibility for such a cleanup, it does have a moral responsibility since the mills primarily produced uranium for Federal programs. Further, it is the only organization able to undertake such a cleanup program on a comprehensive basis. GAO also suggests several areas where the proposed legislation could be strengthened

  7. Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

    1997-01-01

    Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL`s Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed.

  8. UTILIZING THE RIGHT MIX OF ENVIRONMENTAL CLEANUP TECHNOLOGIES

    International Nuclear Information System (INIS)

    The Savannah River Site (SRS) Figure 1 is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units that are required by environmental regulations, to undergo characterization and, if needed, remediation. In the initial years of the SRS environmental cleanup program (early 1990s), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical/pH-adjusting injection, phytoremediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baroballs, electrical resistance heating, soil vapor extraction, and microblowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works proactively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup

  9. Cleanup/stimulation of a horizontal wellbore using propellants

    Energy Technology Data Exchange (ETDEWEB)

    Rougeot, J.E.; Lauterbach, K.A.

    1993-01-01

    This report documents the stimulation/cleanup of a horizontal well bore (Wilson 25) using propellants. The Wilson 25 is a Bartlesville Sand well located in the Flatrock Field, Osage County, Oklahoma. The Wilson 25 was drilled to determine if horizontal drilling could be used as a means to economically recover primary oil that had been left in place in a mostly abandoned oil field because of the adverse effects of water coning. Pump testing of the Wilson 25 horizontal well bore before cleanup or stimulation produced 6 barrels of oil and .84 barrels of water per day. The high percentage of daily oil production to total daily fluid production indicated that the horizontal well bore had accessed potentially economical oil reserves if the fluid production rate could be increased by performing a cleanup/stimulation treatment. Propellants were selected as an inexpensive means to stimulate and cleanup the near well bore area in a uniform manner. The ignition of a propellant creates a large volume of gas which penetrates the formation, creating numerous short cracks through which hydrocarbons can travel into the well bore. More conventional stimulation/cleanup techniques were either significantly more expensive, less likely to treat uniformly, or could not be confined to the near well bore area. Three different propellant torpedo designs were tested with a total of 304' of horizontal well bore being shot and producible. The initial test shot caused 400' of the horizontal well bore to become plugged off, and subsequently it could not be production tested. The second and third test shots were production tested, with the oil production being increased 458% and 349%, respectively, on a per foot basis. The Wilson 25 results indicate that a propellant shot treatment is an economically viable means to cleanup/stimulate a horizontal well bore.

  10. Cleanup standards for inland oil spills : a review

    International Nuclear Information System (INIS)

    There are a wide range of issues that should be addressed in the development of oil spill cleanup criteria and standards, yet there is currently no clear and concise decision procedure that can be applied by a spill response management team. This paper presented three inland spill cases which demonstrated different parts of the spectrum of cleanup standards. These case study examples showed that there is a progression with increasing levels of concern and increasing levels of treatment or cleanup effort. The first case study described the removal of mobile oil in a remote location. It involved a series of large crude oil spills in 1994 from sections of the Vosei-Golovnye pipeline in the Komi Republic of Russia. The second case study described multiple standards for the removal of oil residues and oiled vegetation in a populated rural region. It involved a spill of 29,000 bbl of mixed crude oil and condensate in January 2000 from the OSSA II pipeline at the Rio Desaguadero river crossing in Bolivia. The third case study described the restoration of a salmon spawning stream to a lowest effects concentration. It involved a gasoline release, explosion and fire that resulted from the Olympic Pipe Line rupture in June 1999 in Bellingham, Washington. Each of the three response operations was based on different objectives and different cleanup standards for the completion of the cleanup. The process by which criteria are developed for inland oil spills was described. The choice of treatment ranges from no treatment to a zero tolerance position. Deciding which measure is appropriate is a social and political process that is not based on science alone. While soil and water quality standards have been established by government agencies, these are intended mostly for chronic situations rather than for one-time events such as oil spills. Almost all assessments of an appropriate cleanup program consider the net environmental benefits (NEB) and risk associated with different

  11. UTILIZING THE RIGHT MIX OF ENVIRONMENTAL CLEANUP TECHNOLOGIES

    Energy Technology Data Exchange (ETDEWEB)

    Bergren, C; Wade Whitaker, W; Mary Flora, M

    2007-05-25

    The Savannah River Site (SRS) Figure 1 is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units that are required by environmental regulations, to undergo characterization and, if needed, remediation. In the initial years of the SRS environmental cleanup program (early 1990s), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical/pH-adjusting injection, phytoremediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baroballs, electrical resistance heating, soil vapor extraction, and microblowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works proactively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup

  12. Accelerated cleanup Initiatives Putting the Acceleration Plans into Action

    International Nuclear Information System (INIS)

    This paper describes project successes during the last year and presents strategies for accomplishing work required to accelerate waste retrieval, treatment and closure of 177 large underground waste tanks at the Hanford Site. The tanks contain approximately 53 million gallons of liquid, sludge, and solid waste resulting from decades of national defense production. The Hanford Site is a 560 square-mile area in southeastern Washington State. One of the nation's largest rivers, the Columbia River, flows through the site and within seven miles of the waste tanks. The US. Department of Energy (DOE) Office of River Protection and CH2M HILL Hanford Group, Inc. (CH2M HILL) drew upon the recommendations in the DOE's Top-To-Bottom Review and the ideas that emerged from the Cleanup Challenges and Constraints Team (C3T) when creating new initiatives last fall in accelerated tank cleanup. The initiatives reflect discussions and planning during the last year by the DOE, regulatory,agencies, Hanford stakeholders, and CH2M HILL on how to accelerate tank cleanup and closure. The initiatives focus on near-term risk reduction, deployment of proven cleanup technologies, and completing the feed delivery and waste storage systems needed to support Hanford's Waste Treatment Plant. Working with the Office of River Protection, CH2M HILL is changing the way it does business to align with the new focus on accelerated tank cleanup initiatives. A key concept of this new approach is to deploy simple, proven technologies whenever possible to accomplish program goals. Finding existing technologies and evaluating whether they can be applied to or adapted to Hanford tank cleanup provide the best chance for success in achieving treatment of all of Hanford's tank waste by 2028

  13. Bioremediation: environmental clean-up through pathway engineering.

    Science.gov (United States)

    Singh, Shailendra; Kang, Seung Hyun; Mulchandani, Ashok; Chen, Wilfred

    2008-10-01

    Given the immense risk posed by widespread environmental pollution by inorganic and organic chemicals, novel methods of decontamination and clean-up are required. Owing to the relatively high cost and the non-specificity of conventional techniques, bioremediation is a promising alternative technology for pollutant clean-up. Advances in bioremediation harness molecular, genetic, microbiology, and protein engineering tools and rely on identification of novel metal-sequestering peptides, rational and irrational pathway engineering, and enzyme design. Recent advances have been made for enhanced inorganic chemical remediation and organic chemical degradation using various pathway-engineering approaches and these are discussed in this review. PMID:18760355

  14. Sodium cleanup system of fast reactor NPP (retrospectively - prospective outlook)

    International Nuclear Information System (INIS)

    When reasoned the coolant cleanup system of perspective fast reactor NPPs the traditional methods of coolant purification (cold traps, sorbents for cesium) as well as possibility to use hot traps for sodium purification from oxygen have been analyzed. It is shown that cold trap must be a mandatory element of cleanup system built in tank; hot traps can provide sodium coolant purification from oxygen during NPP nominal condition. Recommendations on further lines of work for improving cold traps characteristics are given, and further lines of work for hot traps parameters optimization are considered

  15. Quarterly environmental data summary for fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1997 is prepared in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data presented constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the fourth quarter of 1997. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined ``above normal`` level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in response to such data. Data received and verified during the fourth quarter were within a permissible range of variability except for those which are detailed.

  16. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-14

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  17. Regulatory and technical reports (abstract index journal)

    International Nuclear Information System (INIS)

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  18. Quarterly coal report, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1997 and aggregated quarterly historical data for 1991 through the first quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

  19. Quarterly Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    David Gray; Glen Tomlinson

    1998-11-12

    The Federal Energy Technology Center (FETC) at Pittsburgh contracted with the MJTRE Corporation to perform Research Guidance Studies that will assist the Center and other relevant offices in the Department of Energy in evaluating and prioritizing research in the areas of coal and natural gas conversion. MITRE was reorganized in December 1995, which resulted in the formation of Mitretek Systems Inc. Mitretek has been performing this work on MITRE's behalf awaiting completion of contract novation to Mitretek. The contract was novated in February 1998 to Mitretek Systems. The overall objectives of this contract are to provide support to DOE in the following areas: (1) technical and economic analyses of current and future coal-based energy conversion technologies and other similar emerging technologies such as coal-waste coprocessing, natural gas conversion, and biomass conversion technologies for the production of fuels, chemicals and electric power,(2) monitor progress in these technologies with respect to technical, economic, and environmental impact (including climate change), (3) conduct specific and generic project economic and technical feasibility studies based on these technologies, (4) identify long-range R&D areas that have the greatest potential for process improvements, and (5) investigate optimum configurations and associated costs for production of high quality energy products via refining and their performance in end-use applications.

  20. Disposal of waste from the cleanup of large areas contaminated as a result of a nuclear accident

    International Nuclear Information System (INIS)

    The report provides an overview of the methodology and technology available to load, transport and dispose of large volumes of contaminated material arising from the cleanup of areas after a nuclear accident and includes data on the planning, implementation, management and costing of such activities. To demonstrate the use of this information, three cleanup and disposal scenarios are examined, ranging from disposal in many small mounds or trenches within the contaminated area to disposal in a large facility away from the plant. As in the two companion reports, it is assumed that the population has been evacuated from the affected area. The report reviews the generic types of low level radioactive waste which are likely to arise from such a cleanup. The report does not deal with the recovery and disposal of intermediate and high level radioactive material on or near the plant site. This material will have to be recovered, packaged, transported and stored on-site or disposed of at an appropriate facility. These operations should be done by specialist teams using shielded or remotely operated equipment. Also not included are methods of in situ stabilization of contamination, for example ploughing to bury the top contaminated layer at a suitable depth. These techniques, which are likely to be widely used in part of the evacuated are, are discussed in IAEA Technical Reports Series No. 300, Vienna, 1989. 50 refs, 18 figs, 4 tabs

  1. Lessons learned in the cleanup of Three Mile Island Unit 2 as determined by the TMI-2 safety advisory board

    International Nuclear Information System (INIS)

    The Three Mile Island Unit 2 Safety Advisor Board (SAB) was established on March 16, 1981, to provide GPU Nuclear Corporation management with a high-level, independent appraisal of the cleanup program as related to public and worker health safety. In its 7 1/2 yr of existence, the SAB has reviewed many aspects of cleanup activities, including regulations, safety, risk assessment, project organization, project financing, project procedures, technical planning, and public communications. The primary objective of the SAB has been to ensure the continued safety of the surrounding community and of the on-site work force. It was of paramount importance that the reactor plant be placed in a stable, controllable condition as soon as possible. The work of the SAB can be described under three major headings: scientific, engineering, and administrative. Included under the scientific heading is recriticality, environmental effects, and accident scenario. The engineering heading includes removal of fuel debris, methods of decontamination, control of personnel exposures, and personnel contamination control. The administrative heading includes over control of cleanup operations, cost and schedule control, organization, project planning, and communications with the public

  2. Hanford Cleanup... Restore the Columbia River Corridor Transition the Central Plateau Prepare and Plan for the End State

    International Nuclear Information System (INIS)

    The U.S. Department of Energy's (DOE) Hanford Site in southeastern Washington State was established during World War II to produce plutonium for nuclear weapons as part of the top-secret Manhattan Project. In 1989, Hanford's mission changed to cleanup and closure; today the site is engaged in one of the world's largest and most aggressive programs to clean up radioactive and hazardous wastes. The size and complexity of Hanford's environmental problems are made even more challenging by the overlapping technical, political, regulatory, financial and cultural issues associated with the cleanup. The physical challenges at the Hanford Site are daunting. More than 50 million gallons of liquid radioactive waste in 177 underground storage tanks; 2,300 tons of spent nuclear fuel;12 tons of plutonium in various forms; 25 million cubic feet of buried or stored solid waste; 270 billion gallons of groundwater contaminated above drinking-water standards spread out over about 80 square miles; more than 1,700 waste sites; and approximately 500 contaminated facilities. With a workforce of approximately 7,000 and a budget of about $1.8 billion dollars this fiscal year, Hanford cleanup operations are expected to be complete by 2035, at a cost of $60 billion dollars. (authors)

  3. Collaboration Results - Applying Technical Solutions To Environmental Remediation Problems

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, G.; Fiore, J.; Walker, J.; DeRemer, C.; Wight, E.

    2002-02-26

    Within the Department of Energy's Office of Environmental Management (EM), the Office of Science and Technology (OST) identifies and develops innovative technologies that accelerate cleanup of high-priority environmental contamination problems and enable EM closure sites to meet closure schedules. OST manages an integrated research and development program that is essential to completing timely and cost-effective cleanup and stewardship of DOE sites. While innovative technologies can make significant contributions to the cleanup process, in some cases, EM has encountered unexpected barriers to their implementation. Technical obstacles are expected, but administrative challenges-such as regulatory, organizational, and stakeholder issues-must also be addressed. OST has found that collaborative needs identification and problem solving are essential components in overcoming these barriers. Collaboration helps EM meet its cleanup goals, close sites, and reduce the overall cost of cleanup at DOE sites nationwide. This paper presents examples of OST's collaboration efforts that expedite site closure and solve specific cleanup problems at EM sites.

  4. Planning for cleanup of large areas contaminated as a result of a nuclear accident

    International Nuclear Information System (INIS)

    The cleanup of large areas of contaminated as a result of an accident at a nuclear facility could cost hundreds of millions of dollars and cause inconvenience to the public. Such a cleanup programme would be undertaken only if the detriment to health and social life resulting from cleanup activities would be less than that resulting from further exposures. All reasonable means should, however, be used to minimize the costs and detriment to humans of such a cleanup. For such a cleanup to be carried out safely, efficiently and as quickly as possible under adverse conditions requires: Good preliminary and final planning; A cleanup team having a well defined management structure and well trained personnel; and Suitable cleanup methods and equipment and cleanup criteria. 35 refs, 8 figs, 5 tabs

  5. ITER task T299 (1996) : fuel cleanup system demonstration tests

    International Nuclear Information System (INIS)

    The objective of this task is to demonstrate processes for efficient cleanup and detritiation of the plasma exhaust. In this subtask, the objectives were to provide further design data on the HITEX process, and to build and demonstrate 2-stage high-detritiation HITEX performance. (author). 9 refs., 1 tab., 11 figs

  6. Enewetak fact book (a resume of pre-cleanup information)

    International Nuclear Information System (INIS)

    The book contains a group of short treatises on the precleanup condition of the islands in Enewetak Atoll. Their purpose was to provide brief guidance to the radiological history and radiological condition of the islands for use in cleanup of the atoll

  7. Cleanup Verification Package for the 118-F-6 Burial Ground

    International Nuclear Information System (INIS)

    This cleanup verification package documents completion of remedial action for the 118-F-6 Burial Ground located in the 100-FR-2 Operable Unit of the 100-F Area on the Hanford Site. The trenches received waste from the 100-F Experimental Animal Farm, including animal manure, animal carcasses, laboratory waste, plastic, cardboard, metal, and concrete debris as well as a railroad tank car

  8. Enewetak fact book (a resume of pre-cleanup information)

    Energy Technology Data Exchange (ETDEWEB)

    Bliss, W. (comp.)

    1982-09-01

    The book contains a group of short treatises on the precleanup condition of the islands in Enewetak Atoll. Their purpose was to provide brief guidance to the radiological history and radiological condition of the islands for use in cleanup of the atoll. (ACR)

  9. Cleanup at Los Alamos National Laboratory - the challenges - 9493

    Energy Technology Data Exchange (ETDEWEB)

    Stiger, Susan G [Los Alamos National Laboratory; Hargis, Kenneth M [Los Alamos National Laboratory; Graham, Michael J [Los Alamos National Laboratory; Rael, George J [NNSL/LASO

    2008-01-01

    This paper provides an overview of environmental cleanup at the Los Alamos National Laboratory (LANL) and some of the unique aspects and challenges. Cleanup of the 65-year old Department of Energy Laboratory is being conducted under a RCRA Consent Order with the State of New Mexico. This agreement is one of the most recent cleanup agreements signed in the DOE complex and was based on lessons learned at other DOE sites. A number of attributes create unique challenges for LANL cleanup -- the proximity to the community and pueblos, the site's topography and geology, and the nature of LANL's on-going missions. This overview paper will set the stage for other papers in this session, including papers that present: Plans to retrieve buried waste at Material Disposal Area B, across the street from oen of Los Alamos' commercial districts and the local newspaper; Progress to date and joint plans with WIPP for disposal of the remaining inventory of legacy transuranic waste; Reviews of both groundwater and surface water contamination and the factors complicating both characterization and remediation; Optimizing the disposal of low-level radioactive waste from ongoing LANL missions; A stakeholder environmental data transparency project (RACER), with full public access to all available information on contamination at LANL, and A description of the approach to waste processing cost recovery from the programs that generate hazardous and radioactive waste at LANL.

  10. Cleanup at the Los Alamos National Laboratory - The Challenges

    International Nuclear Information System (INIS)

    This paper provides an overview of environmental cleanup at the Los Alamos National Laboratory (LANL) and some of the unique aspects and challenges. Cleanup of the 65-year old Department of Energy laboratory is being conducted under a RCRA Consent Order with the State of New Mexico. This agreement is one of the most recent cleanup agreements signed in the DOE complex and was based on lessons learned at other DOE sites. A number of attributes create unique challenges for LANL cleanup - the proximity to the community and pueblos, the site's topography and geology, and the nature of LANL's on-going missions. This overview paper will set the stage for other papers in this session, including papers that present: - Plans to retrieve buried waste at Material Disposal Area B, across the street from one of Los Alamos' commercial districts and the local newspaper; - Progress to date and joint plans with WIPP for disposal of the remaining inventory of legacy transuranic waste; - Reviews of both groundwater and surface water contamination and the factors complicating both characterization and remediation; - Optimizing the disposal of low-level radioactive waste from ongoing LANL missions; - A stakeholder environmental data transparency project (RACER), with full public access to all available information on contamination at LANL, and - A description of the approach to waste processing cost recovery from the programs that generate hazardous and radioactive waste at LANL. (authors)

  11. Modeling of vapour generator for clean-up separator module

    International Nuclear Information System (INIS)

    233U clean-up process plays an important role in the thorium fuel cycle. This process is based on laser isotope separation (LIS) using atomic vapour, where the impure 233U (containing 232U) is evaporated in high vacuum environment. The vapour is interacted with laser beam to selectively ionize 232U, which is removed by electrostatic means

  12. Cleanup Verification Package for the 618-2 Burial Ground

    International Nuclear Information System (INIS)

    This cleanup verification package documents completion of remedial action for the 618-2 Burial Ground, also referred to as Solid Waste Burial Ground No. 2; Burial Ground No. 2; 318-2; and Dry Waste Burial Site No. 2. This waste site was used primarily for the disposal of contaminated equipment, materials and laboratory waste from the 300 Area Facilities

  13. Application of State and Federal Guidelines for Establishing Alternate Soil Clean-Up Levels for the Protection of Groundwater at the Hanford Site

    International Nuclear Information System (INIS)

    Risk-based soil cleanup levels that are protective of groundwater have been calculated for use in environmental remediation activities at the Hanford Site using vadose zone fate and transport modeling. The determination of soil cleanup levels is important because it involves the technical basis for the levels of contamination that can be left in place, which are protective of human health and the environment. The determination of risk-based soil cleanup levels is an especially important issue at the Hanford Site where site conditions such as a semi-arid climate, and a thick vadose zone of over 100 meters necessitate the use of appropriate risk-based methods. In the absence of an alternative risk-based approach, the cleanup levels default to background, detection limits, or simplistic formulas not intended for applications involving these distinctive site conditions. However, the use of vadose zone fate and transport modeling for risk-based applications such as the determination of soil cleanup levels in the vadose zone are not as well established as modeling for groundwater applications. Thus, the use of models in this manner involves additional challenges for the demonstration of the efficacy of its use for risk-based applications, in accordance with federal and state regulatory requirements and guidelines. An approach has been developed to integrate with federal and state regulatory guidelines in conjunction with the development of the risk-based methodology. Demonstration of integration with these guidelines primarily involves documentation of the objectives of the problem to be solved, the technical basis and rationale associated with the selection of an appropriate risk-based method (e.g., model type and code selection), and documentation associated with the use of the model, e.g., conceptual site model, parameter estimation, uncertainty and assumptions analyses, and model results. (authors)

  14. Quarterly coal report, July--September 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1998 and aggregated quarterly historical data for 1992 through the second quarter of 1998. 58 tabs.

  15. Aircraft Nuclear Propulsion Project Quarterly Progress Report for Period Ending December 31, 1956

    Energy Technology Data Exchange (ETDEWEB)

    NA, NA [ORNL

    1957-03-12

    This quarterly progress report of the Aircraft Nuclear Propulsion Project at ORNL records the technical progress of research on circulating-fuel reactors and other ANP research at the Laboratory. The report is divided into five major parts: 1) Aircraft Reactor Engineering, 2) Chemistry, and 3) Metallurgy, 4) Heat Transfer and Physical Properties, Radiation Damage, and Fuel Recovery and Reprocessing, and 5) Reactor Shielding.

  16. Coal gasification. Quarterly report, January-March 1979. [US DOE supported

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    Progress in DOE-supported coal gasification pilot plant projects is reported: company, location, contract number, funding, process description, history and progress in the current quarter. Two support projects are discussed: preparation of a technical data book and mathematical modeling of gasification reactors. (LTN)

  17. 77 FR 9847 - Safety Zone; Kinnickinnic River Containment and Cleanup; Milwaukee, WI

    Science.gov (United States)

    2012-02-21

    ... SECURITY Coast Guard 33 CFR Part 165 RIN 1625-AA00 Safety Zone; Kinnickinnic River Containment and Cleanup... presented by the containment and cleanup of petroleum product are immediate and do not allow time for a... Michigan, has determined that the containment and cleanup poses a serious risk of injury to persons...

  18. First quarter 2005 sales data

    International Nuclear Information System (INIS)

    This press release brings information on the AREVA group sales data. First quarter 2005 sales for the group were 2,496 millions of euros, up 3,6% year-on-year from 2,41 millions. The change in foreign exchange rates between the two periods show a negative impact of 22 millions euros, which is much lower than in the first quarter of 2004. It analyzes also in more details the situation of the front end, the reactors and service division, the back end division, the transmission and distribution division and the connectors division. (A.L.B.)

  19. Yucca Mountain Site Characterization Project Technical Data Catalog

    International Nuclear Information System (INIS)

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993 (this edition), should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994

  20. Hanford tank clean up: A guide to understanding the technical issues

    International Nuclear Information System (INIS)

    One of the most difficult technical challenges in cleaning up the US Department of Energy's (DOE) Hanford Site in southeast Washington State will be to process the radioactive and chemically complex waste found in the Site's 177 underground storage tanks. Solid, liquid, and sludge-like wastes are contained in 149 single- and 28 double-shelled steel tanks. These wastes contain about one half of the curies of radioactivity and mass of hazardous chemicals found on the Hanford Site. Therefore, Hanford cleanup means tank cleanup. Safely removing the waste from the tanks, separating radioactive elements from inert chemicals, and creating a final waste form for disposal will require the use of our nation's best available technology coupled with scientific advances, and an extraordinary commitment by all involved. The purpose of this guide is to inform the reader about critical issues facing tank cleanup. It is written as an information resource for the general reader as well as the technically trained person wanting to gain a basic understanding about the waste in Hanford's tanks -- how the waste was created, what is in the waste, how it is stored, and what are the key technical issues facing tank cleanup. Access to information is key to better understanding the issues and more knowledgeably participating in cleanup decisions. This guide provides such information without promoting a given cleanup approach or technology use

  1. Hanford tank clean up: A guide to understanding the technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Gephart, R.E.; Lundgren, R.E.

    1995-12-31

    One of the most difficult technical challenges in cleaning up the US Department of Energy`s (DOE) Hanford Site in southeast Washington State will be to process the radioactive and chemically complex waste found in the Site`s 177 underground storage tanks. Solid, liquid, and sludge-like wastes are contained in 149 single- and 28 double-shelled steel tanks. These wastes contain about one half of the curies of radioactivity and mass of hazardous chemicals found on the Hanford Site. Therefore, Hanford cleanup means tank cleanup. Safely removing the waste from the tanks, separating radioactive elements from inert chemicals, and creating a final waste form for disposal will require the use of our nation`s best available technology coupled with scientific advances, and an extraordinary commitment by all involved. The purpose of this guide is to inform the reader about critical issues facing tank cleanup. It is written as an information resource for the general reader as well as the technically trained person wanting to gain a basic understanding about the waste in Hanford`s tanks -- how the waste was created, what is in the waste, how it is stored, and what are the key technical issues facing tank cleanup. Access to information is key to better understanding the issues and more knowledgeably participating in cleanup decisions. This guide provides such information without promoting a given cleanup approach or technology use.

  2. 10 CFR 34.29 - Quarterly inventory.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR... RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly physical inventory to account for all sealed sources and for devices containing depleted uranium...

  3. Short-term energy outlook: Quarterly projections, Third quarter 1992

    International Nuclear Information System (INIS)

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The principal users of the Outlook are managers and energy analysts in private industry and government. The forecast period for this issue of the Outlook extends from the third quarter of 1992 through the fourth quarter of 1993. Values for the second quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding

  4. Short-term energy outlook, Quarterly projections. Third quarter 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-08-04

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the third quarter of 1993 through the fourth quarter of 1994. Values for the second quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  5. Short-term energy outlook, quarterly projections, first quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

  6. Applied Meteorology Unit (AMU) Quarterly Report First Quarter FY-04

    Science.gov (United States)

    Bauman, William; Wheeler, Mark; Labert, Winifred; Jonathan Case; Short, David

    2004-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the First Quarter of Fiscal Year 2004 (October - December 2003). Tasks reviewed are: (1) Objective Lightning Probability Forecast, (2) Mesonet Temperature and Wind Climatology, (3) Severe Weather Forecast Decision Aid and (4) Anvil Transparency Relationship to Radar Reflectivity

  7. Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-05

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

  8. Technical approach to groundwater restoration

    International Nuclear Information System (INIS)

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  9. Cleanup procedures at the Nevada Test Site and at other radioactively contaminated sites including representative costs of cleanup and treatment of contaminated areas

    International Nuclear Information System (INIS)

    This review summarizes available information on cleanup procedures at the Nevada Test Site and at other radioactively contaminated sites. Radionuclide distribution and inventory, size of the contaminated areas, equipment, and cleanup procedures and results are included. Information about the cost of cleanup and treatment for contaminated land is presented. Selected measures that could be useful in estimating the costs of cleaning up radioactively contaminated areas are described. 76 refs., 16 tabs

  10. Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 9: Mixed Alcohols From Syngas -- State of Technology

    Energy Technology Data Exchange (ETDEWEB)

    Nexant Inc.

    2006-05-01

    This deliverable is for Task 9, Mixed Alcohols from Syngas: State of Technology, as part of National Renewable Energy Laboratory (NREL) Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Task 9 supplements the work previously done by NREL in the mixed alcohols section of the 2003 technical report Preliminary Screening--Technical and Economic Assessment of Synthesis Gas to Fuels and Chemicals with Emphasis on the Potential for Biomass-Derived Syngas.

  11. Technical Support and Transfer of Geothrmal Technical Knowledge and Information

    Energy Technology Data Exchange (ETDEWEB)

    John W. Lund; Toni" Boyd

    2007-11-14

    The Geo-Heat Center (GHC) staff provided responses to 1442 technical support requests during the contract period (April 1, 2006 to September 30, 2007), which were six quarters under this contract. Our website, consisting of 1900 files, also contributes to our technical assistance activity. Downloaded files were 1,889,323 (3,448 per day) from our website, the total number of users was 1,365,258 (2,491 per day), and the total number of hits were 6,008,500 (10,064 per day). The GHC staff attended 60 workshops, short course and professional meeting and made 29 technical presentations. The staff also prepared and mailed out 2,000 copies of each of five issues of the GHC Quaterly Bulletin which contained 26 articles. We also mailed out approximately 5,000 papers and publications to interested individuals and organizations.

  12. Quarterly coal report, April--June, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1998 and aggregated quarterly historical data for 1992 through the first quarter of 1998. Appendix A displays, from 1992 on, detailed quarterly historical coal imports data. 58 tabs.

  13. Quarterly coal report, October--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for October through December 1996 and aggregated quarterly historical data for 1990 through the third quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 72 tabs.

  14. Quarterly coal report, January--March 1998

    Energy Technology Data Exchange (ETDEWEB)

    Young, P.

    1998-08-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for January through March 1998 and aggregated quarterly historical data for 1992 through the fourth quarter of 1997. Appendix A displays, from 1992 on, detailed quarterly historical coal imports data. To provide a complete picture of coal supply and demand in the United States, historical information has been integrated in this report. 58 tabs.

  15. Quarterly coal report, October--December 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for October through December 1998 and aggregated quarterly historical data for 1992 through the third quarter of 1998. Appendix A displays, from 1992 on, detailed quarterly historical coal imports data. 58 tabs.

  16. Equine disease surveillance: quarterly summary.

    Science.gov (United States)

    2016-05-14

    Multiple reports of equine herpesvirus type 1 in the UKFirst cases of dourine in Botswana and equine infectious anaemia in GreeceSummary of UK surveillance testing, October to December 2015These are among matters discussed in the most recent quarterly equine disease surveillance report, prepared by Defra, the Animal Health Trust and the British Equine Veterinary Association. PMID:27179087

  17. Indonesia Economic Quarterly FY13

    OpenAIRE

    World Bank

    2013-01-01

    The Indonesia economic quarterly reports on and synthesizes the past three months key developments in Indonesia s economy. It places them in a longer-term and global context, and assesses the implications of these developments and other changes in policy for the outlook for Indonesia s economic and social welfare. Its coverage ranges from the macroeconomy to financial markets to indicators of ...

  18. Equine disease surveillance: quarterly summary.

    Science.gov (United States)

    2016-07-30

    National and international disease outbreaksAfrican horse sickness in South AfricaRising EHV-1 abortion cases in the UKSummary of surveillance testing, January to March 2016 These are among matters discussed in the most recent quarterly equine disease surveillance report, prepared by Defra, the Animal Health Trust and the British Equine Veterinary Association. PMID:27474057

  19. NST Quarterly. January 1996 issue

    International Nuclear Information System (INIS)

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in nuclear medicine, healthcare products sterilization, industrial irradiation dosimetry and heavy metals determination in food. The Malaysian standard for food irradiation was discussed in this issue

  20. Inactive waste sites at Hanford: The technical and management challenge

    International Nuclear Information System (INIS)

    This paper examines some of the key technical and management challenges facing the Hanford Site in developing a coordinated and consistent approach to the cleanup of inactive waste sites. These challenges are similar to those of the original Hanford Site selection and the development of nuclear technology some 45 years ago. To help in understanding these challenges, early Hanford Site history, onsite operations, past waste storage/disposal activities,and Hanford's approach to the characterization and cleanup of inactive waste sites are also described. 28 refs., 5 figs

  1. Utilizing the right mix of environmental cleanup technologies

    International Nuclear Information System (INIS)

    The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units that are required by environmental regulations, to undergo characterization and, if needed, remediation. In the initial years of the SRS environmental cleanup program (early 1990's), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical / pH-adjusting injection, phyto-remediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baro-balls, electrical resistance heating, soil vapor extraction, and micro-blowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works pro-actively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup

  2. Enhanced Practical Photosynthetic CO2 Mitigation. Quarterly Technical Report

    International Nuclear Information System (INIS)

    This report highlights significant achievements in the Enhanced Practical Photosynthetic CO2 Mitigation Project during the ending 12/31/2004. Specific results and accomplishments for the program include review of pilot scale testing and design of a new bioreactor. Testing confirmed that algae can be grown in a sustainable fashion in the pilot bioreactor, even with intermittent availability of sunlight. The pilot-scale tests indicated that algal growth rate followed photon delivery during productivity testing

  3. First quarter technical progress report for Thermally Modified Sand

    Energy Technology Data Exchange (ETDEWEB)

    Gilfilian, R.E.

    1994-02-28

    This report documents progress on a project to demonstrate suitability of Thermally Modified Sand (TMS) for large scale use by demonstrating its performance on icy roadways maintained by the State of Alaska Department of Transportation. This report deals primarily with the startup of the project and includes initial observations of the effectiveness of the use of the TMS versus the typical salt/sand combination.

  4. Second quarter technical progress report for Thermally Modified Sand

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    The objective was to have the Alaska Department of Transportation & Public Facilities Operation & Maintenance Section use Thermally Modified Sand (TMS) for treatment of icy state roadways. The project included the evaluation on the workability of a large stockpile of TMS material left undisturbed throughout the 1993/94 winter season.

  5. Quarterly technical progress report, April-June 1980

    International Nuclear Information System (INIS)

    Progress and activities are reported on the following four lines of assurance (LOA-1 through 4): prevent accidents, limit core damage, maintain containment integrity, and attenuate radiological consequences

  6. Technical Division quarterly progess report, July 1--September 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Slansky, C.M.; Musgrave, B.C.; Dickey, B.R.; Rohde, K.L.

    1977-10-01

    Results are presented on the fluidized-bed calcination of simulated radioactive waste from the reprocessing of spent commercial nuclear fuel, on the post treatment of the calcine, and on the removal of actinide elements from the waste prior to calcination. Other programs include the development of storage technology for {sup 85}Kr waste; a study of the hydrogen mordenite catalyzed reaction between NO{sub x} and NH{sub 3}; the adsorption and storage of {sup 129}I on silver exchanged mordenite; physical properties, materials of construction, and unit operations studies on the evaporation of high-level waste; the behavior of volatile radionuclides during the combustion of HTGR graphite-based fuel; and the use of the uranium-ruthenium system in age-dating uranium ore bodies.

  7. Technical Division quarterly progress report, January 1--March 31, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Slansky, C.M. (ed.)

    1978-07-01

    Fuel Cycle Research and Development: Results are presented on the fluidized-bed calcination of simulated waste from the reprocessing of spent commercial nuclear fuel, on the post-treatment of the resultant calcine, and on the use of bidentate extractants for the separation of actinide elements from the high-level waste prior to calcination. In addition, the development of storage technology for krypton-85 waste, and the behavior of RuO/sub 2/ in fluidized-bed combustion of HTGR fuel are reported. Special Materials Production: Reported are the long-term management of defense waste from the ICPP, the chemistry and pilot plant-studies on the removal of actinides and mercury from ICPP first cycle raffinate, the calcined solids retrieval and handling of ICPP waste stored in vaults, and the preparation of environmental impact statements on options given the Defense Waste Document. Process improvements are given on the Fluorinel headend process for zircaloy-clad fuel and on methods for uranium accountability. Other development results reported are on the Rover process for graphite based fuels, on the calcination of sodium-bearing waste, Fluorinel waste, tank WM-183 waste, and electrolytic process waste. Assistance to the Waste Calcination Process Plant is reported as well as support to the New Waste Calcination Process and methods for the monitoring of gaseous effluents. Other Projects Supporting Energy Developments: Results are reported on nuclear materials security, the behavior of liquid-solid fluidized-bed heat exchangers, in-plant reactor source term measurements, burnup methods for fast breeder reactor fuels, absolute thermal fission yields, analytical support to light water breeder reactor development, and species of iodine in the environment. Research on analytical methods cover iodine-129 in calciner feed, computing room improvements, stack gas sampling for particulates, analysis of glassified calcined waste, and specific components in various materials.

  8. Oak Ridge Reservation Federal Facility Agreement quarterly report for the Environmental Restoration Program, Volume 1, October--December 1992

    International Nuclear Information System (INIS)

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program which are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1992(first quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been formally approved as FY 1993 commitments. This first section is followed by: significant accomplishments; technical status at Y-12 operable units, Oak Ridge National Laboratory, Oak Ridge K-25 site, Clinch River, Oak Ridge Associated Universities, and technical oversight and technical programs; and response action contractor assignments

  9. Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

  10. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  11. The AMTEX Partnership. Third quarterly report, FY 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lemon, D.K.; Quisenberry, R.K. [AMTEX Partnership (United States)

    1995-06-01

    Key activities for the quarter were the initiation of tactical work on the OPCon Project, development of a draft of the AMTEX Policies and Procedures document, and a meeting of the Industry Technical Advisory Committee. A significant milestone was reached when a memorandum of understanding was signed between the DOE and The Department of Commerce. The agreement signified the official participation of the National Institute of Standards and Technology on the Demand Activated Manufacturing Architecture (DAMA) project in AMTEX. Project accomplishments are given for: computer-aided manufacturing, cotton biotechnology, DAMA, electronic embedded fingerprints, rapid cutting, sensors for agile manufacturing, and textile resource conservation.

  12. Integrated Data Collection Analysis (IDCA) Program — Quarterly Review Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Sandstrom, Mary M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brown, Geoffrey W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Warner, Kirstin F. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Sorensen, Daniel N. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Remmers, Daniel L. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Shelley, Timothy J. [Air Force Research Lab. (AFRL/RXQF), Tyndall AFB, FL (United States); Reyes, Jose A. [Applied Research Associates, Inc., Tyndall AFB, FL (United States); Phillips, Jason J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hsu, Peter C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Reynolds, John G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-12-05

    On November 9 and 10, 2011 the IDCA had the annual quarterly meeting. The meeting started the afternoon of the first day with a tour of the NSWC IHD explosives safety testing and analysis facilities. The meeting on the second day addressed the formal sponsor review and further technical issues for the IDCA. Examination of the IHD equipment during the tour, lead to a long discussion on liquid test methods. The discussion resulted in revision of liquid test methods in the impact test and selection of a new liquid test standard. In addition, modifications to friction, spark and thermal test methods were discussed.

  13. Combining innovative technology demonstrations with dense nonaqueous phase liquids cleanup

    International Nuclear Information System (INIS)

    Radioactively contaminated acidic aqueous wastes and organic liquids were discharged to the soil column at three disposal sites within the 200 West Area of the Hanford Site, Washington. As a result, a portion of the underlying groundwater is contaminated with carbon tetrachloride several orders of magnitude above the maximum contaminant level accepted for a drinking water supply. Treatability testing and cleanup actions have been initiated to remove the contamination from both the unsaturated soils to minimize further groundwater contamination and the groundwater itself. To expedite cleanup, innovative technologies for (1) drilling, (2) site characterization, (3) monitoring, (4) well field development, and (5) contaminant treatment are being demonstrated and subsequently used where possible to improve the rates and cost savings associated with the removal of carbon tetrachloride from the soils and groundwater

  14. A systematic assessment of the state of hazardous waste clean-up technologies

    International Nuclear Information System (INIS)

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ''Decontamination Systems Information and Research Programs.'' Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushing (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming

  15. Cleanup Verification Package for the 600-259 Waste Site

    Energy Technology Data Exchange (ETDEWEB)

    J. M. Capron

    2006-02-09

    This cleanup verification package documents completion of remedial action for the 600-259 waste site. The site was the former site of the Special Waste Form Lysimeter, consisting of commercial reactor isotope waste forms in contact with soils within engineered caissons, and was used by Pacific Northwest National Laboratory to collect data regarding leaching behavior for target analytes. A Grout Waste Test Facility also operated at the site, designed to test leaching rates of grout-solidified low-level radioactive waste.

  16. Cleanup Verification Package for the 618-8 Burial Ground

    International Nuclear Information System (INIS)

    This cleanup verification package documents completion of remedial action for the 618-8 Burial Ground, also referred to as the Solid Waste Burial Ground No. 8, 318-8, and the Early Solid Waste Burial Ground. During its period of operation, the 618-8 site is speculated to have been used to bury uranium-contaminated waste derived from fuel manufacturing, and construction debris from the remodeling of the 313 Building

  17. Cleanup Verification Package for the 618-3 Burial Ground

    Energy Technology Data Exchange (ETDEWEB)

    M. J. Appel

    2006-09-12

    This cleanup verification package documents completion of remedial action for the 618-3 Solid Waste Burial Ground, also referred to as Burial Ground Number 3 and the Dry Waste Burial Ground Number 3. During its period of operation, the 618-3 site was used to dispose of uranium-contaminated construction debris from the 311 Building and construction/demolition debris from remodeling of the 313, 303-J and 303-K Buildings.

  18. Cleanup Verification Package for the 618-3 Burial Ground

    International Nuclear Information System (INIS)

    This cleanup verification package documents completion of remedial action for the 618-3 Solid Waste Burial Ground, also referred to as Burial Ground Number 3 and the Dry Waste Burial Ground Number 3. During its period of operation, the 618-3 site was used to dispose of uranium-contaminated construction debris from the 311 Building and construction/demolition debris from remodeling of the 313, 303-J and 303-K Buildings

  19. Characterization of plutonium contamination at Maralinga: Dosimetry and cleanup criteria

    International Nuclear Information System (INIS)

    An area of South Australia remained contaminated following British atomic tests at Maralinga during 1955-1963. Of importance is the long lived 239Pu of which some 24 kg was explosively dispersed in several 'minor trials'. The extent, quantities and physical characteristics of the plutonium have been assessed and estimates of dose, dominated by the inhalation pathway in the critical group of Aborigines living a semi-traditional lifestyle, have been made for potential occupants. Dosimetry, together with social and economic factors, underpins the setting of cleanup criteria in terms of activity concentrations averaged over large areas and permissible concentrations of contaminated particles. The possibility of intentional behaviour such as fragment scavenging has also influenced limits on particulate contamination. Rehabilitation of the most contaminated areas is underway, with scraping of surface soil and burial on site completed. Vehicular-mounted radiation detector systems for wide area and particle monitoring have been developed, and procedures established for determining cleanup boundaries and for the verification monitoring to ensure that the cleanup process has met the specified criteria. Data are being obtained for a final dose and health risk assessment of the cleaned up site. (author)

  20. A risk-based cleanup criterion for PCE in soil

    International Nuclear Information System (INIS)

    The most important attribute of a chemical contaminant at a hazardous-wastes site for decision makers to consider with regard to its cleanup is the potential risk associated with human exposure. For this reason we have developed a strategy for establishing a risk-based cleanup criterion for chemicals in soil. We describe this strategy by presenting a cleanup criterion for tetrachloroethylene (PCE) in soil associated with a representative California landscape. We being by discussing the environmental fate and transport model, developed at the Lawrence Livermore National Laboratory (LLNL), that we used to predict the equilibrium concentration of PCE in five environmental media from a steady-state source in soil. Next, we explain the concept and application of pathway-exposure factors (PEFs), the hazard index, and cancer-potency factors (CPFs) for translating the predicted concentrations of PCE into estimated potential hazard or risk for hypothetically exposed individuals. Finally, the relationship between concentration and an allowable level of risk is defined and the societal and financial implications are discussed. 22 refs., 6 tabs

  1. Rocky Flats Cleanup Agreement implementation successes and challenges

    International Nuclear Information System (INIS)

    On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations

  2. Oil, Gas, Coal and Electricity - Quarterly statistics. Second Quarter 2012

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-15

    This publication provides up-to-date and detailed quarterly statistics on oil, coal, natural gas and electricity for the OECD countries. Oil statistics cover production, trade, refinery intake and output, stock changes and consumption for crude oil, NGL and nine selected oil product groups. Statistics for electricity, natural gas, hard coal and brown coal show supply and trade. Import and export data are reported by origin and destination. Moreover, oil and hard coal production are reported on a worldwide basis.

  3. Applied Meteorology Unit (AMU) Quarterly Report Fourth Quarter FY-04

    Science.gov (United States)

    Bauman, William; Wheeler, Mark; Lambert, Winifred; Case, Jonathan; Short, David

    2004-01-01

    This report summarizes the Applied Meteorology Unit (A MU) activities for the fourth quarter of Fiscal Year 2004 (July -Sept 2004). Tasks covered are: (1) Objective Lightning Probability Forecast: Phase I, (2) Severe Weather Forecast Decision Aid, (3) Hail Index, (4) Shuttle Ascent Camera Cloud Obstruction Forecast, (5) Advanced Regional Prediction System (ARPS) Optimization and Training Extension and (5) User Control Interface for ARPS Data Analysis System (ADAS) Data Ingest.

  4. Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

  5. Decontamination Systems Information and Research Program: Quarterly report, July--September 1994

    International Nuclear Information System (INIS)

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ''Decontamination Systems Information and Research Programs'' (DOE Instrument No.: DE-FC21-92MC29467). Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the eighth Quarterly Technical Progress Report for the Agreement. This report reflects the progress and/or efforts performed on the 16 technical projects encompassed by the Agreement for the period of July 1 through September 30, 1994. These projects focus on the following: Bio-remediation of organic compounds, heavy metals, and radionuclides; miscellaneous remediation technologies; instrumentation; and technology assessments

  6. Commercial LFCM vitrification technology. Quarterly progress report, October-December 1984

    International Nuclear Information System (INIS)

    This report is the first in a series of quarterly reports compiled by the Nuclear Waste Treatment Program Office at Pacific Northwest Laboratory to document progress on commercial liquid-fed ceramic melter (LFCM) vitrification technology. Progress in the following technical subject areas during the first quarter of FY 1985 is discussed: pretreatment systems, melting process chemistry, glass development and characterization, feed preparation and transfer systems, melter systems, canister filling and handling systems, off-gas systems, process/product modeling and control, and supporting studies. 33 figs., 12 tabs

  7. Technical Shibboleths.

    Science.gov (United States)

    Harris, John S.

    1998-01-01

    Focuses on technical sub-languages to reveal sociological functions of language that transcend mere transfer of substantive information. Finds one sociological feature, the shibboleth, acting widely throughout technical fields. (PA)

  8. Cleanup Verification Package for the 300-8 Waste Site

    International Nuclear Information System (INIS)

    This cleanup verification package documents completion of remedial action for the 300-8 waste site. This waste site was formerly used to stage scrap metal from the 300 Area in support of a program to recycle aluminum. This cleanup verification package documents completion of remedial action for the 300-8 waste site. The 300-8 site is located within the 300-FF-2 Operable Unit in the 300 Area of the Hanford Site in southeastern Washington State. The site was formerly used to stage scrap metal from the 300 Area in support of a program to recycle aluminum. Staging and loading activities at the site scattered scrap metal over an approximately 34,000-m2 (366,000-ft2) area, with residual metallic debris generally present within the top 0.4 m (1.5 ft) of soil. Site excavation and waste disposal are complete, and post-excavation geophysical surveys confirm the removal of residual metallic debris. The exposed surfaces have been sampled and analyzed to verify attainment of the remedial action goals. Results of the sampling, laboratory analyses, and data evaluations for the 300-8 site indicate that all remedial action objectives and goals for direct exposure, protection of groundwater, and protection of the Columbia River have been met for industrial land use (Table ES-1). Because residual soil concentrations indicated that cleanup levels for more stringent land uses may have been achieved for the 300-8 site, a supplemental evaluation was performed against unrestricted land-use cleanup objectives established in the Explanation of Significant Differences for the 300-FF-2 Operable Unit Record of Decision (EPA 2004). Results of the evaluation (Table ES-2) demonstrate that residual contaminant concentrations do not preclude any future uses (as bounded by the rural-residential scenario) and allow for unrestricted use of shallow zone soils (i.e., surface to 4.6 m (15 ft) deep). This site does not have a deep zone; therefore, no deep zone institutional controls are required. The site

  9. The Role Of Land Use In Environmental Decision Making At Three DOE Mega-Cleanup Sites, Fernald, Rocky Flats, and Mound

    International Nuclear Information System (INIS)

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  10. Geothermal direct-heat utilization assistance. Quarterly report, October--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-97. It describes 174 contracts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  11. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1995--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1995-12-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-95. It describes 80 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal energy cost evaluation and marketing strategy for geothermal district heating. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  12. 4. Quarterly progress report, 1982

    International Nuclear Information System (INIS)

    This quarterly report of the SCPRI exposes an interpretation of the principal results concerning the surveillance of radioactivity in the environment: atmospheric dusts, rainwater, surface water, underground water, irrigation water, drinking water, food chain, sea water around nuclear plant sites and other sites. The activities of various radioisotopes are presented in tables (7Be, 58Co, 60Co, 134Cs, 137Cs, 125Sb, 90Sr, 106Ru, K, 54Mn, U and T). A bibliographic selection is also presented

  13. Third quarter 2005 sales figures

    International Nuclear Information System (INIS)

    With manufacturing facilities in over 40 countries and a sales network in over 100, AREVA offers customers technological solutions for nuclear power generation and electricity transmission and distribution. The group also provides interconnect systems to the telecommunications, computer and automotive markets. This document presents the sales figures of the group for the third quarter of 2005: sales revenues in the front end division, in the reactor and services division, in the back end division and in the transmission and distribution division

  14. 2. Quarterly progress report, 1983

    International Nuclear Information System (INIS)

    This quarterly report of the SCPRI exposes an interpretation of the principal results concerning the surveillance of radioactivity in the environment: atmospheric dusts, rainwater, surface water, underground water, irrigation water, drinking water, food chain, sea water around nuclear plant sites and other sites. The activities of various radioisotopes are presented in tables (7Be, 58Co, 60Co, 134Cs, 137Cs, 90Sr, 106Ru, K, 54Mn, U and T). A bibliographic selection is also presented

  15. NST Quarterly - July 1997 issue

    International Nuclear Information System (INIS)

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in incineration and thermal treatment technology of radioactive and toxic wastes. MINT celebrates it's Silver Jubilee celebration this year (1997). In this issue, it announces the programmes outlined for this memorable year include a series of talks and lectures by distinguished guest speakers, international conference, essay and quiz contests for schools

  16. 3. Quarterly progress report 1982

    International Nuclear Information System (INIS)

    This quarterly report of the SCPRI exposes an interpretation of the principal results concerning the surveillance of radioactivity in the environment: atmospheric dusts, rainwater, surface water, underground water, irrigation water, drinking water, food chain, sea water around nuclear plant sites and other sites. The activities of various radioisotopes are presented in tables (7Be, 58Co, 60Co 134Cs, 137Cs, 90Sr, 106Ru, K, 54Mn, U and T). A bibliographic selection is also presented

  17. 3. quarter 2006 sales revenue

    International Nuclear Information System (INIS)

    This document presents the sales revenue of the 3. quarter 2006 for the Group AREVA. The sales revenues for the first nine months of 2006 are up by 8,1% to 7,556 millions euros; the nuclear operations are up by 5,2% reflecting strong performance in the front end division; the transmission and distribution division is up by 14%. (A.L.B.)

  18. Indonesia Economic Quarterly, December 2015

    OpenAIRE

    World Bank

    2015-01-01

    The Indonesia Economic Quarterly (IEQ) has two main aims. First, it reports on the key developments over the past three months in Indonesia’s economy, and places these in a longerterm and global context. Based on these developments, and on policy changes over the period, the IEQ regularly updates the outlook for Indonesia’s economy and social welfare. Second, the IEQ provides a more in-dep...

  19. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards -- Fiscal Year 2002 Mid-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Bredt, Paul R.; Ainsworth, Calvin C.; Brockman, Fred J.; Camaioni, Donald M.; Egorov, Oleg B.; Felmy, Andrew R.; Gorby, Yuri A.; Grate, Jay W.; Greenwood, Margaret S.; Hay, Benjamin P.; Hess, Nancy J.; Hubler, Timothy L.; Icenhower, Jonathan P.; Mattigod, Shas V.; McGrail, B. Peter; Meyer, Philip D.; Murray, Christopher J.; Panetta, Paul D.; Pfund, David M.; Rai, Dhanpat; Su, Yali; Sundaram, S. K.; Weber, William J.; Zachara, John M.

    2002-06-11

    Pacific Northwest National Laboratory has been awarded a total of 80 Environmental Management Science Program (EMSP) research grants since the inception of the program in 1996. The Laboratory has collaborated on an additional 14 EMSP awards with funding received through other institution. This report describes how each of the projects awarded in 1999, 2000, and 2001 addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in the individual project reports included in this document. Projects are under way in three main areas: Tank Waste Remediation, Decontamination and Decommissioning, and Soil and Groundwater Cleanup.

  20. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    International Nuclear Information System (INIS)

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998, and seven in fiscal year 1999. All of the fiscal year 1996 award projects have been completed and will publish final reports, so their annual updates will not be included in this document. This section summarizes how each of the currently funded grants addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation; Decontamination and Decommissioning; Spent Nuclear Fuel and Nuclear Materials; and Soil and Groundwater Cleanup

  1. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Clark D.; Bennett, Sheila Q.

    2000-07-25

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998 and seven in fiscal year 1999.(a) All of the fiscal year 1996 awards have been completed and the Principal Investigators are writing final reports, so their summaries will not be included in this document. This section summarizes how each of the currently funded grants addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, and Soil and Groundwater Cleanup.

  2. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    CD Carlson; SQ Bennett

    2000-07-25

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998, and seven in fiscal year 1999. All of the fiscal year 1996 award projects have been completed and will publish final reports, so their annual updates will not be included in this document. This section summarizes how each of the currently funded grants addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation; Decontamination and Decommissioning; Spent Nuclear Fuel and Nuclear Materials; and Soil and Groundwater Cleanup.

  3. Quarterly coal report, October--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-23

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for October through December 1994 and aggregated quarterly historical data for 1986 through the third quarter of 1994. Appendix A displays, from 1986 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  4. Quarterly coal report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-24

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1995 and aggregated quarterly historical data for 1987 through the fourth quarter of 1994. Appendix A displays, from 1987 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  5. Quarterly coal report, October--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities. This report presents detailed quarterly data for october through December 1997 and aggregated quarterly historical data for 1991 through the third quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data, as specified in Section 202 of the energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

  6. Quarterly coal report, January--March 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    This Quarterly Coal Report (QCR) provides comprehensive information about U.S. coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience,including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. The data presented in the QCR are collected and published by the Energy Information Administration (EIA) to fulfill data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275), as amended. This report presents detailed quarterly data for January through March 1997 and aggregated quarterly historical data for 1991 through the fourth quarter of 1996. Appendix A displays, from 1988 on, detailed quarterly historical coal imports data, as specified in Section 202 of the Energy Policy and Conservation Amendments Act of 1985 (Public Law 99-58). Appendix B gives selected quarterly tables converted to metric tons.

  7. Quarterly coal report, April--June 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-11-02

    The Quarterly Coal Report provides comprehensive information about US coal production, exports, imports, receipts, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. This issue presents detailed quarterly data for April 1990 through June 1990, aggregated quarterly historical data for 1982 through the second quarter of 1990, and aggregated annual historical data for 1960 through 1989 and projected data for selected years from 1995 through 2010. To provide a complete picture of coal supply and demand in the United States, historical information and forecasts have been integrated in this report. 7 figs., 37 tabs.

  8. EBR-II cover-gas cleanup system upgrade

    International Nuclear Information System (INIS)

    Technology advances in the past few years have prompted an effort at Argonne National Laboratory to replace existing equipment with high-performance digital computers and color-graphic displays. Improved operation of process systems can be achieved by utilizing state-of-the-art computer technology in the areas of process control and process monitoring. The cover-gas cleanup system (CGCS) at the Experimental Breeder Reactor II (EBR-II) is the first system to be upgraded with high-performance digital equipment. The upgrade consisted of a main control computer, a distributed control computer, a front-end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper describes the main control computer and the operator interface control software. Argonne National Laboratory's EBR-II is a pool-type nuclear reactor demonstration facility that uses liquid sodium as the primary system and secondary system coolant. The primary system tank contains ∼330000 ell of liquid sodium blanketed with an argon cover gas. Despite this inert atmosphere, the primary system requires a cover-gas monitoring and cleanup system, the CGCS. The CGCS maintains low levels of impurities in the cover gas so that even small levels of impurities can be detected to flag a failed fuel element and to support mass spectrometer analysis to identify a failed fuel element. Impurities can be introduced to the argon cover gas by the failure of fuel element cladding and the subsequent release of gaseous fission products or xenon open-quotes tag gasclose quotes placed in the fuel elements for the purpose of signaling a fuel element breach. The CGCS consists of a main cleanup loop and a gas analysis system

  9. The value of superfund cleanups : evidence from U.S. Environmental Protection Agency decisions

    OpenAIRE

    Gupta, Shreekant; Van Houtven, George; Cropper, Maureen L.; DEC

    1994-01-01

    Under the Superfund law, the U.S. Environmental Protection Agency (EPA) is responsible for inspecting hazardous waste sites and for putting those with the most serious contamination problems on a national priorities list. The EPA then oversees the cleanup of these sites, suing potentially responsible parties for the costs of cleanup when possible, and funding the cleanup of"orphaned"sites out of the Superfund, money raised taxing chemical and petroleum products. The Superfund program is contr...

  10. Short-term energy outlook, quarterly projections, second quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

  11. Applied Meteorology Unit (AMU) Quarterly Report Third Quarter FY-08

    Science.gov (United States)

    Bauman, William; Crawford, Winifred; Barrett, Joe; Watson, Leela; Dreher, Joseph

    2008-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the third quarter of Fiscal Year 2008 (April - June 2008). Tasks reported on are: Peak Wind Tool for User Launch Commit Criteria (LCC), Anvil Forecast Tool in AWIPS Phase II, Completion of the Edward Air Force Base (EAFB) Statistical Guidance Wind Tool, Volume Averaged Height Integ rated Radar Reflectivity (VAHIRR), Impact of Local Sensors, Radar Scan Strategies for the PAFB WSR-74C Replacement, VAHIRR Cost Benefit Analysis, and WRF Wind Sensitivity Study at Edwards Air Force Base

  12. Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-09

    Science.gov (United States)

    Bauman, William; Crawford, Winifred; Barrett, Joe; Watson, Leela; Wheeler, Mark

    2009-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the fourth quarter of Fiscal Year 2009 (July - September 2009). Tasks reports include: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool. Phase III, (3) Peak Wind Tool for General Forecasting. Phase II, (4) Update and Maintain Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS), (5) Verify MesoNAM Performance (6) develop a Graphical User Interface to update selected parameters for the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLlT)

  13. Applied Meteorology Unit (AMU) Quarterly Report. First Quarter FY-05

    Science.gov (United States)

    Bauman, William; Wheeler, Mark; Lambert, Winifred; Case, Jonathan; Short, David

    2005-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the first quarter of Fiscal Year 2005 (October - December 2005). Tasks reviewed include: (1) Objective Lightning Probability Forecast: Phase I, (2) Severe Weather Forecast Decision Aid, (3) Hail Index, (4) Stable Low Cloud Evaluation, (5) Shuttle Ascent Camera Cloud Obstruction Forecast, (6) Range Standardization and Automation (RSA) and Legacy Wind Sensor Evaluation, (7) Advanced Regional Prediction System (ARPS) Optimization and Training Extension, and (8) User Control Interface for ARPS Data Analysis System (ADAS) Data Ingest

  14. EBR-II cover-gas cleanup system

    International Nuclear Information System (INIS)

    Operation of EBR-II with breached elements results in the continuous release of fission gases to the argon cover gas. To control activity in the reactor, a cover-gas cleanup system (CGCS) was installed to remove xenon and krypton from the cover gas by cryogenic distillation. Although only one breached fuel element will, by intention, be in-core during the early stages of the run-beyond-cladding-breach (RBCB) program now under way, the CGCS is designed to handle the activity released by up to 12 mixed-oxide elements

  15. NHC's contribution to cleanup of the Hanford Site

    International Nuclear Information System (INIS)

    The one billion dollars per year Project Hanford Management Contract (PHMC), managed by Fluor Daniel Hanford, calls for cleanup of the Hanford Site for the Department of Energy. Project Hanford comprises four major subprojects, each managed by a different major contractor. Numatec Hanford Corporation (NHC) is a fifth major subcontractor which provides energy and technology to each of the Hanford projects. NHC draws on the experience and capabilities of its parent companies, COGEMA and SGN, and relies on local support from its sister Company in Richland, COGEMA Engineering Corporation, to bring the best commercial practices and new technology to the Project

  16. Cleanup Verification Package for the 118-F-1 Burial Ground

    International Nuclear Information System (INIS)

    This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste

  17. Fernald restoration: ecologists and engineers integrate restoration and cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Woods, Eric; Homer, John

    2002-07-15

    As cleanup workers excavate pits and tear down buildings at the Fernald site in southwest Ohio, site ecologists are working side-by-side to create thriving wetlands and develop the early stages of forest, prairie, and savanna ecosystems to restore natural resources that were impacted by years of site operations. In 1998, the U.S. Department of Energy-Fernald Office (DOE-FN) and its cleanup contractor, Fluor Fernald, Inc., initiated several ecological restoration projects in perimeter areas of the site (e.g., areas not used for or impacted by uranium processing or waste management). The projects are part of Fernald's final land use plan to restore natural resources over 904 acres of the 1,050-acre site. Pete Yerace, the DOE-FN Natural Resource Trustee representative is working with the Fernald Natural Resource Trustees in an oversight role to resolve the state of Ohio's 1986 claim against DOE for injuries to natural resources. Fluor Fernald, Inc., and DOE-FN developed the ''Natural Resource Restoration Plan'', which outlines 15 major restoration projects for the site and will restore injured natural resources at the site. In general, Fernald's plan includes grading to maximize the formation of wetlands or expanded floodplain, amending soil where topsoil has been removed during excavation, and establishing native vegetation throughout the site. Today, with cleanup over 35 percent complete and site closure targeted for 2006, Fernald is entering a new phase of restoration that involves heavily remediated areas. By working closely with engineers and cleanup crews, site ecologists can take advantage of remediation fieldwork (e.g., convert an excavated depression into a wetland) and avoid unnecessary costs and duplication. This collaboration has also created opportunities for relatively simple and inexpensive restoration of areas that were discovered during ongoing remediation. To ensure the survival of the plant material in heavily

  18. Risky business: Assessing cleanup plans for waste sites

    International Nuclear Information System (INIS)

    ORNL was chosen to perform human health and ecological risk assessments for DOE because of its risk assessment expertise. The U.S. Department of Energy's many production and research sites contain radioactive and hazardous wastes. These waste sites pose potential risks to the health and safety of remediation and waste management workers and the public. The risks, however, vary from site to site. Some sites undoubtedly present larger risks than others and should be cleaned up first. However, before the cleanup begins, DOE is required by law to prepare an environmental impact statement on any actions that may significantly affect the environment-even actions that would clean it up

  19. Cleanup Verification Package for the 116-K-2 Effluent Trench

    Energy Technology Data Exchange (ETDEWEB)

    J. M. Capron

    2006-04-04

    This cleanup verification package documents completion of remedial action for the 116-K-2 effluent trench, also referred to as the 116-K-2 mile-long trench and the 116-K-2 site. During its period of operation, the 116-K-2 site was used to dispose of cooling water effluent from the 105-KE and 105-KW Reactors by percolation into the soil. This site also received mixed liquid wastes from the 105-KW and 105-KE fuel storage basins, reactor floor drains, and miscellaneous decontamination activities.

  20. Land Use and Land Cover - MO 2008 Brownfields Voluntary Cleanup Program Sites (SHP)

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — The Brownfields/Voluntary Cleanup Program (BVCP) provides property buyers, sellers, developers, bankers, development agencies, local government and other voluntary...

  1. Hanford Long Term Stewardship Program and Transition [Preparing for Environmental Management Cleanup Completion

    International Nuclear Information System (INIS)

    Long-term stewardship (LTS) at the Hanford Site begins at the completion of the U.S. Department of Energy (DOE), Office of Environmental Management (EM) cleanup mission and is the management of the risks (human health and environmental) associated with any residual contamination and the management of the Site's cultural, biological, and natural resources that remain after the Site is reduced to its post-cleanup-mission size. This document describes the anticipated post-cleanup LTS program, the preparations planned to facilitate the safe and timely transition from the completion of the cleanup program to a future LTS program, and when LTS is complete. Although the completion of cleanup remains several decades away, actions are being taken now to ensure the following: DOE's commitment to meet its long-term, post-cleanup obligations is reaffirmed and that its planning efforts to comply with those obligations are visible; The interface between the cleanup program and the LTS program will be clearly defined; Cleanup decisions will include careful and well-documented consideration of their long-term ramifications (e.g., long-term effectiveness and costs) and Potential impediments to a safe and timely turnover from cleanup to LTS are anticipated and a risk management approach is developed and implemented

  2. Quarterly coal report, January--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-20

    The United States produced 242 million short tons of coal in the first quarter of 1993, a decrease of 6 percent (14 million short tons) from the amount produced during the first quarter of 1992. The decrease was due to a decline in production east of the Mississippi River. All major coal-producing States in this region had lower coal production levels led by West Virginia, which produced 5 million short tons less coal. The principal reasons for the overall drop in coal output compared to a year earlier were: A decrease in demand for US coal in foreign markets; a slower rate of producer/distributor stock build-up; and a drawn-down of electric utility coal stocks. Distribution of US coal in the first quarter of 1993 was 10 million short tons lower than in the first quarter of 1992, with 5 million short tons less distributed to both electric utilities and overseas markets. The average price of coal delivered to electric utilities during the first quarter of 1993 was $28.65 per short ton, the lowest value since the first quarter of 1980. Coal consumption in the first quarter of 1993 was 230 million short tons, 4 percent higher than in the first quarter of 1992, due primarily to a 5-percent increase in consumption at electric utility plants. Total consumer stocks, at 153 million short tons, and electric utility stocks, at 144 million short tons, were at their lowest quarterly level since the end of 1989. US. coal exports totaled 19 million short tons, 6 million short tons less than in the first quarter of 1992, and the lowest quarterly level since 1988. The decline was primarily due to a 1-million-short-ton drop in exports to each of the following destinations: Italy, France, Belgium and Luxembourg, and Canada.

  3. Quarterly coal report, January--March 1993

    International Nuclear Information System (INIS)

    The United States produced 242 million short tons of coal in the first quarter of 1993, a decrease of 6 percent (14 million short tons) from the amount produced during the first quarter of 1992. The decrease was due to a decline in production east of the Mississippi River. All major coal-producing States in this region had lower coal production levels led by West Virginia, which produced 5 million short tons less coal. The principal reasons for the overall drop in coal output compared to a year earlier were: A decrease in demand for US coal in foreign markets; a slower rate of producer/distributor stock build-up; and a drawn-down of electric utility coal stocks. Distribution of US coal in the first quarter of 1993 was 10 million short tons lower than in the first quarter of 1992, with 5 million short tons less distributed to both electric utilities and overseas markets. The average price of coal delivered to electric utilities during the first quarter of 1993 was $28.65 per short ton, the lowest value since the first quarter of 1980. Coal consumption in the first quarter of 1993 was 230 million short tons, 4 percent higher than in the first quarter of 1992, due primarily to a 5-percent increase in consumption at electric utility plants. Total consumer stocks, at 153 million short tons, and electric utility stocks, at 144 million short tons, were at their lowest quarterly level since the end of 1989. US. coal exports totaled 19 million short tons, 6 million short tons less than in the first quarter of 1992, and the lowest quarterly level since 1988. The decline was primarily due to a 1-million-short-ton drop in exports to each of the following destinations: Italy, France, Belgium and Luxembourg, and Canada

  4. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  5. Imagining Technicities

    DEFF Research Database (Denmark)

    Liboriussen, Bjarke; Plesner, Ursula

    2011-01-01

    to the elements of taste and skill. In the final analysis those references were synthesized as five imagined technicities: the architect, the engineer, the client, the Chinese, and the Virtual World native. Because technicities are often assumed and rarely discussed as actants who influence practice......, this article focuses on innovative uses of virtual worlds in architecture. We interviewed architects, industrial designers and other practitioners. Conceptually supported by an understanding of technicity found in Cultural Studies, the interviews were then coded with a focus on interviewees’ references......, their role in cooperation and development of ICTs seems to pass unnoticed. However, since they are aligned into ICTs, technicities impact innovation....

  6. NST Quarterly - January 1999 issue

    International Nuclear Information System (INIS)

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in radioactive tracer technique and medical services. Special report on the sediment tracing technique to study the sedimentation pattern at the power stations was presented. The syopsis on two new book launched by MINT also were reviewed. The books are Research Highlights on the Use of Induced Mutations for Plant Improvement in Malaysia and Rice Agro-Ecosystem of the Muda Irrigation Scheme, Malaysia. In medical services, MINT has a group, provide medical physics services such as QA checks on the country's diagnostic radiology equipment and related services

  7. Low-rank coal research. Quarterly report, January--March 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-08-01

    This document contains several quarterly progress reports for low-rank coal research that was performed from January-March 1990. Reports in Control Technology and Coal Preparation Research are in Flue Gas Cleanup, Waste Management, and Regional Energy Policy Program for the Northern Great Plains. Reports in Advanced Research and Technology Development are presented in Turbine Combustion Phenomena, Combustion Inorganic Transformation (two sections), Liquefaction Reactivity of Low-Rank Coals, Gasification Ash and Slag Characterization, and Coal Science. Reports in Combustion Research cover Fluidized-Bed Combustion, Beneficiation of Low-Rank Coals, Combustion Characterization of Low-Rank Coal Fuels, Diesel Utilization of Low-Rank Coals, and Produce and Characterize HWD (hot-water drying) Fuels for Heat Engine Applications. Liquefaction Research is reported in Low-Rank Coal Direct Liquefaction. Gasification Research progress is discussed for Production of Hydrogen and By-Products from Coal and for Chemistry of Sulfur Removal in Mild Gas.

  8. The strategic planning initiative for accelerated cleanup of Rocky Flats

    International Nuclear Information System (INIS)

    The difficulties associated with the congressional funding cycles, regulatory redirection, remediation schedule deadlines, and the lack of a mixed waste (MW) repository have adversely impacted the environmental restoration (ER) program across the entire U.S. Department of Energy (DOE) complex including Rocky Flats Plant (RFP). In an effort to counteract and reduce the impacts of these difficulties, RFP management saw the need for developing a revised ER Program. The objective of the revised ER approach is to identify an initiative that would accelerate the cleanup process and reduce costs without compromising either protection of human health or the environment. A special analysis with that assigned objective was initiated in June 1993 using a team that included DOE Headquarters and Rocky Flats Field Office (RFFO), EG ampersand G personnel, and experts from nationally recognized ER firms. The analysis relied on recent regulatory and process innovations such as DOE's Streamlined Approach for Environmental Restoration (SAFER) and EPA's Superfund Accelerated Cleanup Model (SACM) and Corrective Action Management Units (CAMU). The analysis also incorporated other ongoing improvements efforts initiated by RFP, such as the Quality Action Team and the Integrated Planning Process

  9. Solvent cleanup using base-treated silica gel solid adsorbent

    International Nuclear Information System (INIS)

    A solvent cleanup method using silica gel columns treated with either sodium hydroxide (NaOH) or lithium hydroxide (LiOH) has been investigated. Its effectiveness compares favorably with that of traditional wash methods. After treatment with NaOH solution, the gels adsorb HNO3, dibutyl phosphate (DBP), UO22+, Pu4+, various metal-ion fission products, and other species from the solvent. Adsorption mechanisms include neutralization, hydrolysis, polymerization, and precipitation, depending on the species adsorbed. Sodium dibutyl phosphate, which partially distributes to the solvent from the gels, can be stripped with water; the stripping coefficient ranges from 280 to 540. Adsorption rates are diffusion controlled such that temperature effects are relatively small. Recycle of the gels is achieved either by an aqueous elution and recycle sequence or by a thermal treatment method, which may be preferable. Potential advantages of this solvent cleanup method are that (1) some operational problems are avoided and (2) the amount of NaNO3 waste generated per metric ton of nuclear fuel reprocessed would be reduced significantly. 19 references, 6 figures, 12 tables

  10. Hydrophobic modification of polyurethane foam for oil spill cleanup

    International Nuclear Information System (INIS)

    To improve the oleophilic/hydrophobic properties of polyurethane (PU) foams for oil spill cleanup, PU samples were modified by grafting with oleophilic monomer Lauryl methacrylate (LMA) in solvent and/or coating with LMA microspheres through heating and curing. Modified PU cubes were characterized by field emission scanning electron microscopy (FE-SEM) and Fourier transform infrared spectroscopy (FTIR). The water sorption of modified PU cubes was decreased by 24–50%, while the diesel or kerosene sorption of modified PU cubes was increased by 18–27%. In water–oil system, compared with blank PU cubes, the sorption capacity of PU cubes grafted with LMA was increased by 44% for diesel and 100% for kerosene. The sorption capacity of PU cubes coated with LMA microspheres was increased by 20% for diesel and 7% for kerosene. The solvent sorption of modified PU cubes could reach 50–69 g/g. The modified PU cubes can be effectively used in oil/solvent spill cleanup.

  11. A computer program for deriving soil cleanup criteria

    International Nuclear Information System (INIS)

    The US Department of Energy (DOE) has issued a new order, DOE Order 5400.5, for Radiation Protection of the Public and the Environment. In this order, the DOE sets forth radiological protection guidelines for the cleanup of residual radioactive materials. Radionuclide concentrations and radioactivity levels have been established that are acceptable if a site is to be used without radiological restrictions. The guidelines can be categorized as either generic (site independent), that is, taken from existing radiation protection standards, or site specific, that is, derived from the basic dose limit using site-specific data and models. The generic guidelines for soil concentrations of 226Ra, 228Ra, 230Th, and 232Th adopted in DOE Order 5400.5 are generally consistent with US Environmental Protection Agency standards in Title 40, Code of Federal Regulations, Part 192. Procedures and data for deriving site-specific guidelines for other radionuclides in soil have been coded in a microcomputer program called RESRAD. The RESRAD code has been used by the DOE and its contractors to calculate postremediation doses and cleanup guidelines. The RESRAD code is a useful, easy to run, and very user-friendly tool

  12. Aviation safely management, Valdez oil spill clean-up

    International Nuclear Information System (INIS)

    The March 24, 1989 Exxon Valdez oil spill in Alaska's Prince William Sound (PWS) resulted in an unprecedented mobilization of personnel and oil spill clean-up equipment. This paper describes the comprehensive safety management system implemented for aviation operations supporting the clean-up response in PWS and the Gulf of Alaska (GOA). Aviation support operations quickly expanded to over 100 aircraft obtained from numerous sources. Beginning with early surveillance flights, aviation operations were subject to comprehensive safety management programs, including safety assessments, minimum flight weather criteria, operational standards and procedures, air carrier qualifications, equipment and procedure audits, and emergency response. Communication networks and flight following procedures were established, arctic survival training was conducted, and a full complement of survival equipment was required. These programs were largely responsible for safety performance of the spill response effort-during the 1989-92 response activities, over 56,000 flight hours, 159,000 equivalent passengers, and 20,000 tons of cargo were handled without an aviation related injury. The programs are applicable to offshore development and operational activities, particularly those located in more remote, severe environments

  13. 5 CFR 332.311 - Quarterly examinations.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Quarterly examinations. 332.311 Section... AND SELECTION THROUGH COMPETITIVE EXAMINATION Period of Competition and Eligibility Acceptance of Applications After Closing Date of Examinations § 332.311 Quarterly examinations. (a) A 10-point...

  14. Expansion of the Geo-Heat Quarterly Bulletin. Final report, 15 June 1978-30 June 1979

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.J.

    1979-06-30

    The work of the Center is described in the areas of: public information dissemination service, technical assistance to developers, regional resource planning, and applied research projects. Included in the appendix are four issues of the Geo-Heat Utilization Center Quarterly Bulletin. (MHR)

  15. Idaho National Laboratory Quarterly Occurrence Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, Lisbeth Ann [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-11-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 85 reportable events (18 from the 4th Qtr FY-15 and 67 from the prior three reporting quarters), as well as 25 other issue reports (including events found to be not reportable and Significant Category A and B conditions) identified at INL during the past 12 months (8 from this quarter and 17 from the prior three quarters).

  16. Combustion characterization of beneficiated coal-based fuels. Quarterly report No. 7, October 1990--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Hargrove, M.J.; Chow, O.K.; Nsakala, N.Y.

    1991-02-01

    During the fourth quarter of 1990, the following technical progress was made: (1) Calculated the kinetic characteristics of chars from the combustion of microbubble flotation beneficiated products; (2) continued drop tube combustion tests of the spherical oil agglomeration beneficiated products; (3) analyzed the data from three (MIT) pilot-scale combustion tests of the Upper Freeport feed coal; and (4) continued analyses of the data from the CE pilot-scale tests of nine fuels.

  17. LFCM [liquid-fed ceramic melter] vitrification technology: Quarterly progress report, January--March 1987

    International Nuclear Information System (INIS)

    This report is compiled by the Nuclear Waste Treatment Program and the Hanford Waste Vitrification Program at Pacific Northwest Laboratory to describe the progress in developing, testing, applying and documenting liquid-fed ceramic melter vitrification technology. Progress in the following technical subject areas during the second quarter of FY 1987 is discussed: melting process chemistry and glass development, feed preparation and transfer systems, melter systems, canister filling and handling systems, and process/product modeling. 23 refs., 14 figs., 10 tabs

  18. Design and prototyping of HL-LHC double quarter wave crab cavities for SPS test

    International Nuclear Information System (INIS)

    The LHC high luminosity project envisages the use of the crabbing technique for increasing and levelling the LHC luminosity. Double Quarter Wave (DQW) resonators are compact cavities especially designed to meet the technical and performance requirements for LHC beam crabbing. Two DQW crab cavities are under fabrication and will be tested with beam in the Super Proton Synchrotron (SPS) at CERN by 2017. This paper describes the design and prototyping of the DQW crab cavities for the SPS test.

  19. Design and prototyping of HL-LHC double quarter wave crab cavities for SPS test

    Energy Technology Data Exchange (ETDEWEB)

    Verdu-Andres, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Skaritka, J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wu, Q. [Brookhaven National Lab. (BNL), Upton, NY (United States); Xiao, B. [Brookhaven National Lab. (BNL), Upton, NY (United States); Belomestnykh, S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Stony Brook Univ., NY (United States); Ben-Zvi, I. [Brookhaven National Lab. (BNL), Upton, NY (United States); Stony Brook Univ., NY (United States); Alberty, L. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Artoos, K. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Calaga, R. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Capatina, O. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Capelli, T. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Carra, F. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Leuxe, R. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Kuder, N. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Zanoni, C. [European Organization for Nuclear Research (CERN), Geneva (Switzerland); Li, Z. [SLAC National Accelerator Lab., Menlo Park, CA (United States); Ratti, A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-05-03

    The LHC high luminosity project envisages the use of the crabbing technique for increasing and levelling the LHC luminosity. Double Quarter Wave (DQW) resonators are compact cavities especially designed to meet the technical and performance requirements for LHC beam crabbing. Two DQW crab cavities are under fabrication and will be tested with beam in the Super Proton Synchrotron (SPS) at CERN by 2017. This paper describes the design and prototyping of the DQW crab cavities for the SPS test.

  20. Design and Prototyping of HL-LHC Double Quarter Wave Crab Cavities for SPS Test

    CERN Document Server

    Verdú-Andrés, S; Wu, Q; Xiao, B P; Belomestnykh, S; Ben-Zv, I; Alberty, L; Artoos, Kurt; Calaga, Rama; Capatina, Ofelia; Capelli, Teddy; Carra, Federico; Leuxe, Raphael; Kuder, Norbert; Zanoni, Carlo; Li, Z; Ratti, A

    2015-01-01

    The LHC high luminosity project envisages the use of the crabbing technique for increasing and levelling the LHC luminosity. Double Quarter Wave (DQW) resonators are compact cavities especially designed to meet the technical and performance requirements for LHC beam crabbing. Two DQW crab cavities are under fabrication and will be tested with beam in the Super Proton Synchrotron (SPS) at CERN by 2017. This paper describes the design and prototyping of the DQW crab cavities for the SPS test.

  1. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report

    International Nuclear Information System (INIS)

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects

  2. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Peurrung, L.M.

    1999-06-30

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects.

  3. 40 CFR 312.25 - Searches for recorded environmental cleanup liens.

    Science.gov (United States)

    2010-07-01

    ... local law. (b) All information collected regarding the existence of such environmental cleanup liens... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Searches for recorded environmental cleanup liens. 312.25 Section 312.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...

  4. Preliminary cleanup activities at vicinity properties near Salt Lake City, Utah: Environmental assessment

    International Nuclear Information System (INIS)

    This document describes the preliminary cleanup activities and their impacts for the approximately 100 properties in Salt Lake Valley that have been contaminated by radioactive tailings from the site of the inactive Vitro uranium mill. The 23 properties already included on the official list for cleanup have been used as the basis for estimating impacts at all 100 sites

  5. Techniques for laser spectroscopy of actinide elements: developments in the clean-up process

    International Nuclear Information System (INIS)

    Configuration of an efficient laser clean-up process requires a large amount of basic atomic data provided by careful high resolution spectroscopic experiments involving one or several lasers, both pulsed and cw. Efforts in developing such sources for high resolution spectroscopy in the context of the clean-up process are discussed

  6. Full automatic clean-up robot for dioxin/PCB analysis

    Energy Technology Data Exchange (ETDEWEB)

    Matsumura, T.; Masuzaki, Y.; Takahashi, A.; Koizumi, A. [METOCEAN Environment Inc., Shizuoka (Japan). Environmental Risk Research Center, Inst. of General Science for Environment; Okuyama, H.; Kawada, Y.; Higashiguchi, T. [Moritex Corporation, Yokohama (Japan)

    2004-09-15

    Dioxin analysis requires several steps of clean-up procedures by combination of several column chromatography (e.g. silica gel column chromatography, carbon column chromatography) and sulfuric acid treatment. Full Automatic Clean-up Robot for Dioxin and PCB were developed.

  7. Cleanup Verification Package for the 118-F-5 PNL Sawdust Pit

    Energy Technology Data Exchange (ETDEWEB)

    L. D. Habel

    2008-05-20

    This cleanup verification package documents completion of remedial action, sampling activities, and compliance with cleanup criteria for the 118-F-5 Burial Ground, the PNL (Pacific Northwest Laboratory) Sawdust Pit. The 118-F-5 Burial Ground was an unlined trench that received radioactive sawdust from the floors of animal pens in the 100-F Experimental Animal Farm.

  8. Monitoring methods for determining compliance with decommissioning cleanup criteria at uranium recovery sites

    International Nuclear Information System (INIS)

    Decommissioning of a uranium processing site requires radiological surveys to: (1) identify buildings, equipment, and open land areas that require cleanup; (2) verify that cleanup operations have been successful; and (3) provide a record of the radiological condition of the site following cleanup. This report describes the instruments, measurements, quality assurance, and statistical procedures that can be used to perform pre- and post-cleanup surveys. The procedures described include: (1) gamma-radiation exposure-rate measurements using micro-R-meters, (2) beta-gamma measurements using Geiger-Mueller tubes, (3) wipe tests for surface contamination, and (4) soil analyses for 226Ra and other 238U daughters. During the pre-cleanup survey, locations likely to have 226Ra concentrations that exceed standards can be identified by gamma-radiation exposure-rate measurements. Samples of soil or other material from locations showing elevated exposure rates then can be analyzed for 226Ra to determine the boundaries of areas that exceed standards. Measurements of 238U in the samples can be used to determine whether the 226Ra is due to mill tailings. Beta-gamma measurements and wipe-sample analyses at locations that are suspected of being contaminated with uranium can be used to determine whether uranium concentrations exceed standards for either fixed or removable contamination. A post-cleanup survey that is similar to the pre-cleanup survey can be used to verify that cleanup has been successful. 16 refs

  9. Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-10

    Science.gov (United States)

    Bauman, William; Crawford, Winifred; Barrett, Joe; Watson, Leela; Wheeler, Mark

    2010-01-01

    Three AMU tasks were completed in this Quarter, each resulting in a forecast tool now being used in operations and a final report documenting how the work was done. AMU personnel completed the following tasks (1) Phase II of the Peak Wind Tool for General Forecasting task by delivering an improved wind forecasting tool to operations and providing training on its use; (2) a graphical user interface (GUI) she updated with new scripts to complete the ADAS Update and Maintainability task, and delivered the scripts to the Spaceflight Meteorology Group on Johnson Space Center, Texas and National Weather Service in Melbourne, Fla.; and (3) the Verify MesoNAM Performance task after we created and delivered a GUI that forecasters will use to determine the performance of the operational MesoNAM weather model forecast.

  10. Pursing other deep pockets: California's underground storage tank cleanup fund and insurance policies

    International Nuclear Information System (INIS)

    When faced with a potentially very expensive environmental cleanup, most companies and individuals try to do the only sensible thing, which is to find out if anyone else will pay the bill. This presentation will outline two avenues that may provide a substantial financial contribution to environmental cleanups: (a) California's Underground Storage Tank Cleanup Fund and (b) insurance policies. The Underground Storage Tank Cleanup Fund was established in 1989 to help eligible owners and operators of petroleum underground storage tanks (USTs) to: (a) get reimbursed for costs of unauthorized releases of petroleum from USTs; (b) get reimbursed for damages awarded to third parties as a result of unauthorized releases of petroleum from USTs; and (c) meet federal and state requirements that the UST owner and/or operator be able to pay for cleanup costs and damages to third parties caused by unauthorized releases of petroleum

  11. Statistical design and analysis in the cleanup of environmental radionuclide contamination. DRI publication No. 45012

    International Nuclear Information System (INIS)

    The cleanup of Eniwetok Island before the return of former residents is discussed. Of the contaminants in the soil of the atoll, the most important for cleanup are Pu-238, 239,240, and Am-241, which are present in sufficient quantities to require cleanup, and isotopes of Sr and Cs which also are present and must be considered since these elements can be taken up by food plants such as coconut, pandanus, and breadfruit, and passed on to man. The design of the cleanup sampling program is described. In addition to soil contamination, much metal and concrete debris, not all of it contaminated, as well as buildings and equipment, remain from the testing. The clean-up agreement covered all of this material, contaminated or not

  12. Clean-up criteria for remediation of contaminated soils

    International Nuclear Information System (INIS)

    'How clean is clean?' is a question commonly raised in the remediation of contaminated soils. To help with the answer, criteria are proposed to serve as guidelines for remedial actions and to define a clean-up level such that the remaining contaminant residuals in the soil will not violate the Drinking Water Standards (DWS). The equations for computing those criteria are developed from the principle of conservation of mass and are functions of the maximum concentration level in the water (MCL) and the sorption coefficient. A multiplier, ranging from 10 to 1000, is also factored into the soil standard equation to reflect the effectiveness of various remediation techniques. Maximum allowable concentration in the soil (MSCL) is presented for several contaminants which are being regulated at the present time. Future modifications are recommended for better estimates of the MSCLs as additional transport mechanisms are incorporated to account for other potentially dominant effects

  13. Statistical methods for evaluating the attainment of cleanup standards

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, R.O.; Simpson, J.C.

    1992-12-01

    This document is the third volume in a series of volumes sponsored by the US Environmental Protection Agency (EPA), Statistical Policy Branch, that provide statistical methods for evaluating the attainment of cleanup Standards at Superfund sites. Volume 1 (USEPA 1989a) provides sampling designs and tests for evaluating attainment of risk-based standards for soils and solid media. Volume 2 (USEPA 1992) provides designs and tests for evaluating attainment of risk-based standards for groundwater. The purpose of this third volume is to provide statistical procedures for designing sampling programs and conducting statistical tests to determine whether pollution parameters in remediated soils and solid media at Superfund sites attain site-specific reference-based standards. This.document is written for individuals who may not have extensive training or experience with statistical methods. The intended audience includes EPA regional remedial project managers, Superfund-site potentially responsible parties, state environmental protection agencies, and contractors for these groups.

  14. Soil, groundwater cleanup takes the gamble out of casino operation

    International Nuclear Information System (INIS)

    Colorado's rich stores of gold and silver sparked development of towns like Black Hawk and Central City in the 1890s. Today, these communities are the homes of limited-stakes gaming operations. However casino operators are discovering that having gold and silver underground in the form of tailings is not as desirable as collecting it aboveground in slot machines. A unique environmental engineering approach allowed construction of two new casinos and reclamation of the tailings, as well as cleanup of petroleum-saturated soils and groundwater. A treatment system was designed and constructed to treat groundwater at the Black Hawk site. The most economical alternative for disposing treated groundwater was to discharge it into nearby North Clear Creek. An NPDES permit was obtained requiring treatment of the groundwater for petroleum, heavy metals and pH before discharging it

  15. Hot Chili Peppers: Extraction, Cleanup, and Measurement of Capsaicin

    Science.gov (United States)

    Huang, Jiping; Mabury, Scott A.; Sagebiel, John C.

    2000-12-01

    Capsaicin, the pungent ingredient of the red pepper or Capsicum annuum, is widely used in food preparation. The purpose of this experiment was to acquaint students with the active ingredients of hot chili pepper (capsaicin and dihydrocapsaicin), the extraction, cleanup, and analysis of these chemicals, as a fun and informative analytical exercise. Fresh peppers were prepared and extracted with acetonitrile, removing plant co-extractives by addition to a C-18 solid-phase extraction cartridge. Elution of the capsaicinoids was accomplished with a methanol-acetic acid solution. Analysis was completed by reverse-phase HPLC with diode-array or variable wavelength detection and calibration with external standards. Levels of capsaicin and dihydrocapsaicin were typically found to correlate with literature values for a specific hot pepper variety. Students particularly enjoyed relating concentrations of capsaicinoids to their perceived valuation of "hotness".

  16. RCRA corrective action: Action levels and media cleanup standards

    International Nuclear Information System (INIS)

    This Information Brief describes how action levels (ALs), which are used to determine if it is necessary to perform a Corrective Measures Study (CMS), and media cleanup standards (MCSs), which are used to set the standards for remediation performed in conjunction with Corrective Measures Implementation (CMI) are set. It is one of a series of Information Briefs on RCRA Corrective Action. ALs are health-and-environmentally-based levels of hazardous constituents in ground water, surface water, soil, or air, determined to be indicators for protection of human health and the environment. In the corrective action process, the regulator uses ALs to determine if the owner/operator of a treatment, storage, or disposal facility is required to perform a CMS

  17. The Fort McMurray Historic Uranium Cleanup Project

    Energy Technology Data Exchange (ETDEWEB)

    Geddes, R.B. [AMEC Earth and Environmental, Environmental Div., Oakville, Ontario (Canada)]. E-mail: brian.geddes@amec.com; Case, G.G. [Atomic Energy of Canada Limited, Port Hope, Ontario (Canada)]. E-mail: caseg@aecl.ca; Doney, R. [Marshall Macklin Moaghan Limited, Environmental Management, Thornhill, Ontario (Canada)]. E-mail: Doneyr@mmm.ca

    2006-07-01

    The Fort McMurray Historic Uranium Cleanup Project involved the removal of 42,000 m{sup 3} of soils contaminated with uranium ores and ore concentrates from various properties in the City of Fort McMurray, Alberta. These soils were placed into long-term management in a dedicated, locally developed and secure facility. The soil contamination addressed by the program was the result of incidental spillage and tracking of ores during the unloading of barges and the loading of rail cars as materials were transported via Fort McMurray from uranium mines in the Northwest Territories to a refinery in Port Hope, Ontario. The project was executed over a 10- year time period, involved the participation of the local community at critical junctures, and restored 28 ha of land to productive use. (author)

  18. Williston Reservoir: Site preparation and post-flood cleanup

    International Nuclear Information System (INIS)

    Williston Reservoir is the second largest in Canada and ranks ninth on the world scale. It was formed by the construction of the W.A.C. Bennet Dam and is the most important hydroelectric storage reservoir and largest body of fresh water in British Columbia. Site preparation for the reservoir began in 1962, with pre-flood clearing involving salvage of merchantable timber, handfalling, machine downing, burning of slash and burial. Post-flood cleanup included timber salvage, bailing and burning debris, tractor piling and burning, crane piling in shallows, underwater cutting, and hand cutting during low drawdown. Various types of floating debris have presented problems for recreational use, log booming and transport, waterways and aviation. Protection of the spillway is accomplished with a floating boom upstream of the channel. Administration, funding, forest clearance, salvage methods, clearing standards, wood volumes, project costs, environmental concerns, and future priorities are discussed. 5 figs., 2 tabs

  19. Technologies for environmental cleanup: Toxic and hazardous waste management

    International Nuclear Information System (INIS)

    This is the second in a series of EUROCOURSES conducted under the title, ''Technologies for Environmental Cleanup.'' To date, the series consist of the following courses: 1992, soils and groundwater; 1993, Toxic and Hazardous Waste Management. The 1993 course focuses on recent technological developments in the United States and Europe in the areas of waste management policies and regulations, characterization and monitoring of waste, waste minimization and recycling strategies, thermal treatment technologies, photolytic degradation processes, bioremediation processes, medical waste treatment, waste stabilization processes, catalytic organic destruction technologies, risk analyses, and data bases and information networks. It is intended that this course ill serve as a resource of state-of-the-art technologies and methodologies for the environmental protection manager involved in decisions concerning the management of toxic and hazardous waste

  20. Technology for the oil spills clean-up which provides preliminary accumulation of sorbents into the area of emergence and localization oil spills

    Directory of Open Access Journals (Sweden)

    M.L.Soroka

    2012-12-01

    Full Text Available Introduction: The implementation of measures for the prevention and spill of dangerous goods is an important aspect of sustainable development of railway transport. oil spills accident are the most dangerous. They are accompanied by significant pollution of all environmental objects. Studying and development of oil localization and clean-up technologies of such accidents is an important problem of environmental protection to modern conditions of railway transport development. The purpose: to improve the effectiveness of traditional methods of oil spill elimination and the development of new clean-up technologies adapted to the real conditions of the railway transport of Ukraine. Methods: To achieve the research purposes was used analysis of material flows, typical for places emergence and localization of the oil spill on the railways. Results: Analysis of standard technological scheme for the oil spills eliminations has shown that the most difficult task of effective clean-up surfaces is the timely delivery of oil sorbents and special equipment to the area spill containment. The general effectiveness of the elimination activities specifies the time from the beginning contact of dangerous goods with environmental objects to the absorption it into the structure of sorbent . Us was developed the technological scheme of oil spill elimination. This scheme provide a permanent and fast access to the sorbents into the oil spill localization area. It was proposed to device that allows you to transport the sorbent into sorption booms directly on the tank for transportation of petroleum products. Conclusions: Preventative accumulation of sorbents to the oil spill elimination into the localization area provides the organizational and operational simplicity of all stages of clean-up technology. Technical and economic assessment shows that the proposed technology is effective, technologically feasible and economically competitive.

  1. Soil and groundwater cleanup: benefits and limits of emerging technologies

    Energy Technology Data Exchange (ETDEWEB)

    Caliman, Florentina Anca; Robu, Brindusa Mihaela; Smaranda, Camelia; Pavel, Vasile Lucian; Gavrilescu, Maria [Technical University of Iasi, Department of Environmental Engineering and Management, Faculty of Chemical Engineering and Environmental Protection, Iasi (Romania)

    2011-04-15

    Contaminated soil and groundwater have been the subject of study and research, so that the field of remediation has grown and evolved, continually developing and adopting new technologies in attempts to improve the decontamination. The cleanup of environmental pollution involves a variety of techniques, ranging from simple biological processes to advanced engineering technologies. Cleanup activities may also address a wide range of contaminants. This article is a short analysis of the technologies for cleaning up groundwater and soil, highlighting knowledge and information gaps. Challenges and strategies for cleaning up different types of contaminants, mainly heavy metals and persistent organic compounds are described. Included are technologies that treat ground water contaminants in place in the subsurface and soil technologies that treat the soil either in place or on site in a treatment unit. Emerging technologies such as those based on oxidation-reduction, bioremediation, and nanotechnologies are covered. It is evident that for a good efficiency of remediation, techniques or even whole new technologies may be incorporated into an existing technology as a treatment train, improving its performance or overcome limitations. Several economic and decision-making elements are developed in the final part, based on the analysis carried out throughout the article. The work highlights the fact that excellence in research and technology progress could be attained by the development of technologies to deal more effectively and economically with certain toxic contaminants such as heavy metals, volatile organic compounds, and persistent organic pollutants, associated with optimization of technologies under field remediation conditions and requirements, improving capacity and yields, and reducing costs. Moreover, increasing knowledge of the scope and problem of equipment development could improve the benefits. (orig.)

  2. Plutonium contamination at Maralinga - dosimetry and clean-up criteria

    International Nuclear Information System (INIS)

    An area of South Australia remained contaminated following British nuclear weapons tests at Maralinga during 1955 - 1963. Of importance is the long-lived 239-Pu of which some 24 kg was explosively dispersed in several 'minor trials'. The extent, quantities and physical characteristics of the plutonium have been assessed and estimates of dose, dominated by the inhalation pathway in the critical group of Aborigines living a semi-traditional lifestyle, have been made for potential occupants. Rehabilitation of the most contaminated areas is underway, involving scraping of surface soil and burial at depth on site. Dosimetry, together with social and economic factors, underpins the setting of clean-up criteria in terms of activity concentrations averaged over large areas and permissible concentrations of contaminated particles. The possibility of intentional behaviour such as fragment scavenging has also influenced limits on particulate contamination.The standard for this intervention is that the annual committed dose, for any scenario involving permanent occupancy by semi-traditional Aborigines, will be less than 5 mSv. In fact, following the clean-up, annual doses are not expected to exceed 1 mSv for all realistic scenarios. The possibility of intentional behaviour, such as fragment scavenging, has led to limits on particulate contamination. Three plutonium-contaminated sites have been treated by soil-removal. At Taranaki, the most contaminated site, by limiting the activity of the remaining soil to below about 400 kBq/m2 of 239Pu, and by limiting occupancy factors to those typical of hunting activities in a particular location (0.8%), the dose criteria will be met. An area of about 1.5 km2 has been treated by removal of surface soil at Taranaki. At the other two sites, with no occupancy constraints, more stringent soil-removal criteria have been applied

  3. Oil spill cleanup in severe weather and open ocean conditions

    International Nuclear Information System (INIS)

    Most serious oil spills occur in open water under severe weather conditions. At first the oil stays on the surface, where it is spread by winds and water currents. The action of the waves then mixes the oil into the water column. With time the light elements of crude oil evaporate. The remaining residue is of very low commercial value, but of significant environmental impact. The oil spill can move either out to sea or inshore, where it ends up on the beaches. Normal procedures are to let outbound oil disperse by evaporation and mixing into the water column, and to let the inbound oil collect on the beaches, where the cleanup operations are concentrated. The reason for this is that there is no capability to clean the surface of the water in wave conditions-present-day oil skimmers are ineffective in waves approaching 4 ft in height. It would be simpler, more effective and environmentally more beneficial to skim the oil right at the spill location. This paper describes a method to do this. In the case of an oil spill in open water and high wave conditions, it is proposed to reduce the height of the ocean waves by the use of floating breakwaters to provide a relatively calm area. In such protected areas existing oil skimmers can be used to recover valuable oil and clean up the spill long before it hits the beaches. A floating breakwater developed at the University of Rhode Island by the author can be of great benefit in oil spill cleanup for open ocean conditions. This breakwater is constructed from scrap automobile tires. It is built in units of 20 tires each, which are easily transportable and can be connected together at the spill site to form any desired configuration

  4. Plutonium contamination at Maralinga - dosimetry and clean-up criteria

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, M.B.; Martin, L.J.; O`Brien, R.S.; Williams, G.A. [Australian Radiation Laboratory, Yallambie, VIC (Australia)

    1998-12-31

    An area of South Australia remained contaminated following British nuclear weapons tests at Maralinga during 1955 - 1963. Of importance is the long-lived 239-Pu of which some 24 kg was explosively dispersed in several `minor trials`. The extent, quantities and physical characteristics of the plutonium have been assessed and estimates of dose, dominated by the inhalation pathway in the critical group of Aborigines living a semi-traditional lifestyle, have been made for potential occupants. Rehabilitation of the most contaminated areas is underway, involving scraping of surface soil and burial at depth on site. Dosimetry, together with social and economic factors, underpins the setting of clean-up criteria in terms of activity concentrations averaged over large areas and permissible concentrations of contaminated particles. The possibility of intentional behaviour such as fragment scavenging has also influenced limits on particulate contamination.The standard for this intervention is that the annual committed dose, for any scenario involving permanent occupancy by semi-traditional Aborigines, will be less than 5 mSv. In fact, following the clean-up, annual doses are not expected to exceed 1 mSv for all realistic scenarios. The possibility of intentional behaviour, such as fragment scavenging, has led to limits on particulate contamination. Three plutonium-contaminated sites have been treated by soil-removal. At Taranaki, the most contaminated site, by limiting the activity of the remaining soil to below about 400 kBq/m2 of 239Pu, and by limiting occupancy factors to those typical of hunting activities in a particular location (0.8%), the dose criteria will be met. An area of about 1.5 km{sup 2} has been treated by removal of surface soil at Taranaki. At the other two sites, with no occupancy constraints, more stringent soil-removal criteria have been applied

  5. Quarter-wave pulse tube

    Science.gov (United States)

    Swift, G. W.; Gardner, D. L.; Backhaus, S. N.

    2011-10-01

    In high-power pulse-tube refrigerators, the pulse tube itself can be very long without too much dissipation of acoustic power on its walls. The pressure amplitude, the volume-flow-rate amplitude, and the time phase between them evolve significantly along a pulse tube that is about a quarter-wavelength long. Proper choice of length and area makes the oscillations at the ambient end of the long pulse tube optimal for driving a second, smaller pulse-tube refrigerator, thereby utilizing the acoustic power that would typically have been dissipated in the first pulse-tube refrigerator's orifice. Experiments show that little heat is carried from the ambient heat exchanger to the cold heat exchanger in such a long pulse tube, even though the oscillations are turbulent and even when the tube is compactly coiled.

  6. My Quarter Century with Jan

    CERN Document Server

    Lewin, W H G

    2001-01-01

    A quarter century ago, Jan van Paradijs and I started on a scientific journey, our lives became entwined, and a friendship evolved that shaped both our lives scientifically and in personal matters. To tell our story was very difficult for me. I went through 24 years of notes in my calendars and re-lived more than 8000 days of my own and Jan's life, 20 years of slides, 15 years of e-mail. There were times that I had to stop and leave it alone for a week or more as it became too emotional. Few people know (perhaps only two) what we meant for each other. When Jan died, part of me died.

  7. Econometric Methods within Romanian Quarterly National Accounts

    Directory of Open Access Journals (Sweden)

    Livia Marineta Drăguşin

    2013-04-01

    Full Text Available The aim of the present paper is to synthesise the main econometric methods (including the mathematical and statistical ones used in the Romanian Quarterly National Accounts compilation, irrespectively of Quarterly Gross Domestic Product (QGDP. These methods are adapted for a fast manner to operatively provide information about the country macroeconomic evolution to interested users. In this context, the mathematical and econometric methods play an important role in obtaining quarterly accounts valued in current prices and in constant prices, in seasonal adjustments and flash estimates of QGDP.

  8. Reader-Centered Technical Writing

    Science.gov (United States)

    Narayanan, M.

    2012-12-01

    an old schema. This reinforces basic engineering and mathematical design concepts. Accommodation: Here, it may work in a different manner. Writers may have to accommodate an old schema to a new object. This helps engineers to focus more on applications. Adaptation: Assimilation and accommodation are the two sides of adaptation, Jean Piaget's term for what most of us would call learning. Mathematical design concepts generated by students should be suitable for creative engineering applications. References : Phillips, D. C. and Soltis, Jonas F. (2003) "Piagetian Structures and Psychological Constructivism," in Perspectives on Learning (4th edition). New York: Teachers College Press. Salvo, Michael J. (2001). Ethics of Engagement: User-Centered Design and Rhetorical Methodology. Technical Communication Quarterly Volume 10, Issue 3, 2001. pages 273-290. http://www.ship.edu/~cgboeree/piaget.html http://owl.english.purdue.edu/owl/resource/624/01/

  9. Ocean energy systems. Quarterly report, October-December 1982

    Energy Technology Data Exchange (ETDEWEB)

    1982-12-01

    Research progress is reported on developing Ocean Thermal Energy Conversion (OTEC) systems that will provide synthetic fuels (e.g., methanol), energy-intensive products such as ammonia (for fertilizers and chemicals), and aluminum. The work also includes assessment and design concepts for hybrid plants, such as geothermal-OTEC (GEOTEC) plants. Another effort that began in the spring of 1982 is a technical advisory role to DOE with respect to their management of the conceptual design activity of the two industry teams that are designing offshore OTEC pilot plants that could deliver power to Oahu, Hawaii. In addition, a program is underway in which tests of a different kind of ocean-energy device, a turbine that is air-driven as a result of wave action in a chamber, are being planned. This Quarterly Report summarizes the work on the various tasks as of 31 December 1982.

  10. Quarterly coal report, January--March 1992

    International Nuclear Information System (INIS)

    The United States produced 257 million short tons of coal in the first quarter of 1992. This was the second highest quarterly production level ever recorded. US coal exports in January through March of 1992 were 25 million short tons, the highest first quarter since 1982. The leading destinations for US coal exports were Japan, Italy, France, and the Netherlands, together receiving 46 percent of the total. Coal exports for the first quarter of 1992 were valued at $1 billion, based on an average price of $42.28 per short ton. Steam coal exports totaled 10 million short tons, an increase of 34 percent over the level a year earlier. Metallurgical coal exports amounted to 15 million short tons, about the same as a year earlier. US coal consumption for January through March 1992 was 221 million short tons, 2 million short tons more than a year earlier (Table 45). All sectors but the residential and commercial sector reported increased coal consumption

  11. 76 FR 22910 - ACHP Quarterly Business Meeting

    Science.gov (United States)

    2011-04-25

    ... From the Federal Register Online via the Government Publishing Office ADVISORY COUNCIL ON HISTORIC PRESERVATION ACHP Quarterly Business Meeting AGENCY: Advisory Council on Historic Preservation. ACTION: Notice... c. Southwest Renewable Energy Development and Historic Preservation Working Group IX. New Business...

  12. Quarterly Fishery Surveys - Salton Sea [ds428

    Data.gov (United States)

    California Department of Resources — In the spring of 2003, California Department of Fish and Game (CDFG) personnel began quarterly sampling of Salton Sea fish at fourteen stations around the sea, as...

  13. Cleanup of areas contaminated as a result of a nuclear accident

    International Nuclear Information System (INIS)

    In spite of all precautions, the possibility of an accident at a nuclear power plant which would result in the release of unacceptable amounts of radioactive material and cause serious contamination of surrounding areas cannot be excluded. One protective measure which may be required during the intermediate and late phases of an accident is the cleanup of contaminated areas. The term cleanup includes decontamination, stabilization or isolation of the contamination, along with the transport and disposal of the wastes arising form cleanup. If the Emergency Director decides to implement cleanup after a serious accident, all reasonable means should be used to minimize the huge costs and the detriment to humans. To ensure that the cleanup can be quickly and efficiently carried out requires good preliminary planning, clear strategies, a good managerial team, well trained workers and suitable equipment. To assist Member States in the development of their emergency preparedness plans for cleanup, the IAEA is preparing publications which provide an integrated overview of the overall operational planning for cleanup, methods and equipment to carry out these actions and the means to transport safely and dispose of the large volumes of waste. The paper provides an overview of the information in those reports. (author). 27 refs, 2 figs, 2 tabs

  14. Yucca Mountain Site Characterization Project Technical Data Catalog

    International Nuclear Information System (INIS)

    The June 1, 1985, Department of Energy (DOE)/Nuclear, Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  15. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1996-11-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  16. Technical progress report, 1 April-30 June 1981

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    This report describes the technical accomplishments during the quarter ending June 1981, on the commercial nuclear waste management programs under the direction of the Office of Nuclear Waste Isolation (ONWI). The ONWI program is organized into 8 tasks entitled: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management. Principal investigators in each of these areas have submitted summaries of quarterly highlights for inclusion in this report. Separate abstracts have been prepared for 5 of these tasks for inclusion in the Energy Data Base. (DMC)

  17. Depleted uranium in the air during the cleanup operations at Cape Arza

    Directory of Open Access Journals (Sweden)

    PERKO VUKOTIC

    2004-12-01

    Full Text Available Cape Arza was contaminated with depleted uranium (DU in the air strikes of NATO aeroplanes on May 30, 1999. The cleanup and decontamination of the site started in 2001. Here the results of air monitoring performed during the cleanup operations in Spring 2002. are presented. The collected air samples were analyzed by high-resolution alpha spectrometry. The obtained concentrations of airborne uranium are about ten times higher than the average value usually reported for air. The ratio of the 234U/238U activities indicates the presence of depleted uranium in the air during the cleanup action, due to resuspension and soil disturbance in the contaminated teritory.

  18. Environmental Biosciences Program Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2007-07-31

    In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this

  19. Environmental Biosciences Program Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2006-10-31

    In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this cooperative agreement can be forwarded to Dr. Lawrence C. Mohr in the EBP office of the Medical University of South Carolina at (843) 792-1532.

  20. Environmental Biosciences First Quarter Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2003-09-30

    In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risk issues. These initiatives are consistent with the Medical University's role as a comprehensive state-supported health sciences institution and the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable the Medical University to be a national resource for the scientific investigation of environmental health issues. EBP's success in convening worldwide scientific expertise is due in part to the inherent credibility the Medical University brings to the process of addressing these complex issues. Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene (TCE), polychlorinated biphenyls (PCBs), asbestos and low-dose ionizing radiation. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making.

  1. Environmental Biosciences Program Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2008-01-31

    In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making.

  2. Regulatory Strategies To Minimize Generation Of Regulated Wastes From Cleanup, Continued Use Or Decommissioning Of Nuclear Facilities Contaminated With Polychlorinated Biphenyls (PCBS) - 11198

    International Nuclear Information System (INIS)

    Disposal costs for liquid PCB radioactive waste are among the highest of any category of regulated waste. The high cost is driven by the fact that disposal options are extremely limited. Toxic Substances Control Act (TSCA) regulations require most liquids with PCBs at concentration of (ge) 50 parts-per-million to be disposed by incineration or equivalent destructive treatment. Disposal fees can be as high as $200 per gallon. This figure does not include packaging and the cost to transport the waste to the disposal facility, or the waste generator's labor costs for managing the waste prior to shipment. Minimizing the generation of liquid radioactive PCB waste is therefore a significant waste management challenge. PCB spill cleanups often generate large volumes of waste. That is because the removal of PCBs typically requires the liberal use of industrial solvents followed by a thorough rinsing process. In a nuclear facility, the cleanup process may be complicated by the presence of radiation and other occupational hazards. Building design and construction features, e.g., the presence of open grating or trenches, may also complicate cleanup. In addition to the technical challenges associated with spill cleanup, selection of the appropriate regulatory requirements and approach may be challenging. The TSCA regulations include three different sections relating to the cleanup of PCB contamination or spills. EPA has also promulgated a separate guidance policy for fresh PCB spills that is published as Subpart G of 40 CFR 761 although it is not an actual regulation. Applicability is based on the circumstances of each contamination event or situation. Other laws or regulations may also apply. Identification of the allowable regulatory options is important. Effective communication with stakeholders, particularly regulators, is just as important. Depending on the regulatory path that is taken, cleanup may necessitate the generation of large quantities of regulated waste

  3. From Cleanup to Stewardship. A companion report to Accelerating Cleanup: Paths to Closure and background information to support the scoping process required for the 1998 PEIS Settlement Study

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-10-01

    Long-term stewardship is expected to be needed at more than 100 DOE sites after DOE's Environmental Management program completes disposal, stabilization, and restoration operations to address waste and contamination resulting from nuclear research and nuclear weapons production conducted over the past 50 years. From Cleanup to stewardship provides background information on the Department of Energy (DOE) long-term stewardship obligations and activities. This document begins to examine the transition from cleanup to long-term stewardship, and it fulfills the Secretary's commitment to the President in the 1999 Performance Agreement to provide a companion report to the Department's Accelerating Cleanup: Paths to Closure report. It also provides background information to support the scoping process required for a study on long-term stewardship required by a 1998 Settlement Agreement.

  4. Third Quarter Hanford Seismic Report for Fiscal Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-09-30

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 771 local earthquakes during the third quarter of FY 2009. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during the January – March 2009 time period and reported in the previous quarterly report (Rohay et al, 2009). The frequency of Wooded Island events has subsided with 16 events recorded during June 2009. Most of the events were considered minor (magnitude (Mc) less than 1.0) with 25 events in the 2.0-3.0 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 2.2 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. However, some Hanford employees working within a few miles of the area of highest activity

  5. Idaho National Laboratory Quarterly Occurrence Analysis - 1st Quarter FY 2016

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, Lisbeth Ann [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    This report is published quarterly by the Idaho National Laboratory (INL) Quality and Performance Management Organization. The Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS), as prescribed in DOE Order 232.2, “Occurrence Reporting and Processing of Operations Information,” requires a quarterly analysis of events, both reportable and not reportable, for the previous 12 months. This report is the analysis of 74 reportable events (16 from the 1st Qtr FY-16 and 58 from the prior three reporting quarters), as well as 35 other issue reports (including events found to be not reportable and Significant Category A and B conditions) identified at INL during the past 12 months (15 from this quarter and 20 from the prior three quarters).

  6. Some statistical aspects of the cleanup of Enewetak Atoll

    International Nuclear Information System (INIS)

    Cleaning up the radionuclide contamination at Enewetak Atoll has involved a number of statistical design problems. Theoretical considerations led to choosing a grid sampling pattern; practical problems sometimes lead to resampling on a finer grid. Other problems associated with using grids have been both physical and statistical. The standard sampling system is an in situ intrinsic gamma detector which measures americium concentration. The cleanup guidelines include plutonium concentration, so additional sampling of soil is required to establish Pu/Am ratios. The soil sampling design included both guidelines for location of the samples and also a special pattern of subsamples making up composite samples. The large variance of the soil, sample results makes comparison between the two types difficult anyway, but this is compounded by vegetation attenuation of the in situ readings, soil disturbance influences, and differences in devegetation methods. The constraints inherent in doing what amounts to a research and development project, on a limited budget of time and money, in a field engineering environment are also considered

  7. Clean-up of a jet fuel spill

    International Nuclear Information System (INIS)

    Eaton operates a corporate aircraft hangar facility in Battle Creek, Michigan. Tests showed that two underground storage tanks leaked. Investigation confirmed this release discharged several hundred gallons of Jet A kerosene into the soil and groundwater. The oil moved downward approximately 30 feet and spread laterally onto the water table. Test results showed kerosene in the adsorbed, free and dissolved states. Eaton researched and investigated three clean-up options. They included pump and treat, dig and haul and bioremediation. Jet fuel is composed of readily biodegradable hydrocarbon chains. This fact coupled with the depth to groundwater and geologic setting made bioremediation the low cost and most effective alternative. A recovery well was installed at the leading edge of the dissolved contamination. A pump moved water from this well into a nutrient addition system. Nutrients added included nitrogen, phosphorus and potassium. Additionally, air was sparged into the water. The water was discharged into an infiltration gallery installed when the underground storage tanks were removed. Water circulated between the pump and the infiltration basin in a closed loop fashion. This oxygenated, nutrient rich water actively and aggressively treated the soils between the bottom of the gallery and the top of the groundwater and the groundwater. The system began operating in August of 19923 and reduced jet fuel to below detection levels. In August of 1995 The State of Michigan issued a clean closure declaration to the site

  8. Thermal cleanups using dynamic underground stripping and hydrous pyrolysis oxidation

    Energy Technology Data Exchange (ETDEWEB)

    Aines, R D; Knauss, K; Leif, R; Newmark, R L

    1999-05-01

    In the early 1990s, in collaboration with the School of Engineering at the University of California, Berkeley, Lawrence Livermore National Laboratory developed dynamic underground stripping (DUS), a method for treating subsurface contaminants with heat that is much faster and more effective than traditional treatment methods. more recently, Livermore scientists developed hydrous pyrolysis/oxidation (HPO), which introduces both heat and oxygen to the subsurface to convert contaminants in the ground to such benign products as carbon dioxide, chloride ion, and water. This process has effectively destroyed all contaminants it encountered in laboratory tests. With dynamic underground stripping, the contaminants are vaporized and vacuumed out of the ground, leaving them still to be destroyed elsewhere. Hydrous pyrolysis/oxidation technology takes the cleanup process one step further by eliminating the treatment, handling, and disposal requirements and destroying the contamination in the ground. When used in combination, HPO is especially useful in the final polishing of a site containing significant free-product contaminant, once the majority of the contaminant has been removed.

  9. Cleanup of the Millstone 2 spent fuel pool

    International Nuclear Information System (INIS)

    In 1987, Millstone Nuclear Power Station developed a need for cleanup of their Unit 2 spent fuel pool (SFP). This pool had lost normal water chemistry due to high concentrations of TOC and had lost clarity and viewing capabilities required for fuel handling. After reviewing the various technologies that could be utilized to remove these contaminants, Millstone personnel determined that the reverse osmosis (RO) technology was the most reliable, cost effective, and efficient method for resolving their spent fuel pool clarity problems. The complete water restoration program was accomplished in less than 40 days including mobilization, setup, operation, maintenance, and teardown time. Over 1.38 million gallons of water were processed in 24 days of processing. The program resulted in the successful restoration of water clarity and reduction of the contaminants while maintaining a large percentage of the boron in the water. USE achieved TOC rejection rates of up to 99 percent during the program. The results of the program verify that RO technology is a viable alternative for carrying out water restoration programs in the nuclear industry

  10. Alternative formulations of regenerable flue gas cleanup catalysts

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, M.B.; White, M.G.

    1991-01-01

    The major source of man-made SO{sub 2} in the atmosphere is the burning of coal for electric power generation. Coal-fired utility plants are also large sources of NO{sub x} pollution. Regenerable flue gas desulfurization/NO{sub x} abatement catalysts provide one mechanism of simultaneously removing SO{sub 2} and NO{sub x} species from flue gases released into the atmosphere. The purpose of this project is to examine routes of optimizing the adsorption efficiency, the adsorption capacity, and the ease of regeneration of regenerable flue gas cleanup catalysts. We are investigating two different mechanisms for accomplishing this goal. The first involves the use of different alkali and alkaline earth metals as promoters for the alumina sorbents to increase the surface basicity of the sorbent and thus adjust the number and distribution of adsorption sites. The second involves investigation of non-aqueous impregnation, as opposed to aqueous impregnation, as a method to obtain an evenly dispersed monolayer of the promoter on the surface.

  11. How the K(d) Approach Undermines Groundwater Cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Bethke, Craig M.; Brady, Patrick V.

    1999-07-19

    Environmental scientists have long appreciated that the distribution coefficient (the ''K{sub d}'' or ''constant K{sub d}'') approach predicts the partitioning of heavy metals between sediment and groundwater inaccurately; nonetheless, transport models applied to problems of environmental protection and groundwater remediation almost invariably employ this technique. To examine the consequences of this practice, we consider transport in one dimension of Pb and other heavy metals through an aquifer containing hydrous ferric oxide, onto which heavy metals sorb strongly. We compare the predictions of models calculated using the K{sub d} approach to those given by surface complexation theory, which is more realistic physically and chemically. The two modeling techniques give qualitatively differing results that lead to divergent cleanup strategies. The results for surface complexation theory show that water flushing is ineffective at displacing significant amounts of Pb from the sorbing surface. The effluent from such treatment contains a ''tail'' of small but significant levels of contamination that persists indefinitely. Subsurface zones of Pb contamination, furthermore, are largely immobile in flowing groundwater. These results stand in sharp contrast to the predictions of models constructed using the k{sub d} approach, yet are consistent with experience in the laboratory and field.

  12. Zooremediation, a new biotechnology solution for shoreline protection and cleanup

    International Nuclear Information System (INIS)

    This paper presented the results of a field study in which a zooremediation method was used to clean up an oil spill in the shoreline of Kola Bay in the Barents Sea. The objective was to confirm that the next generation of environmental remediation tools will include remediation and restoration technology based on phytoremediation, bioremediation and zooremediation for the in situ treatment of polluted sites. These techniques are promising, offering effective and ecologically sound cleanup of spill affected sites. The direct effect of zooremediation is uptake, accumulation, and transformation. The main indirect effect of zooremediation is stimulation on microbial population due to the release of nutrients, enzymes and some bio-active metabolites. In this study, oil degradation in the intertidal zone was accelerated 10 to 20 times using zooremediation in which littoral bivalves M. edulis and M. balthica were used. Survival of the bivalves in this area was much higher than in the control area. It was concluded that the bivalves can take up hydrocarbons from oil contaminated sites and treat them in a manner which makes the petroleum hydrocarbons more biologically available for biodegradation. It was concluded that the presence of bivalves in the shoreline can increase oil bioremediation capacity of natural ecosystems. 21 refs., 3 tabs., 4 figs

  13. Selecting protective gloves for oil spill response and cleanup

    International Nuclear Information System (INIS)

    Oil spill responders and cleanup workers must be provided with gloves that prevent skin contact while permitting them to do their job safely and efficiently. Glove selection is largely based on professional judgment, considering permeation, resistance to puncture and abrasion, and whether the material gets slick when coated with oil. This paper consolidates the most useful information from various studies and presents a selection rationale. In general, we found neoprene, polyvinyl chloride (PVC), and nitrile to be the glove materials of choice for protection in oil spills. The skin toxicity potential for most petroleum materials encountered in a spill is low. Some fresh crudes may contain hydrocarbon molecules that may penetrate the skin and cause some systemic toxicity with high enough exposure. However, as crude weathers, the more volatile hydrocarbons evaporate rapidly, leaving behind the heavier fraction, which often contains polynuclear aromatic (PNA) compounds. Some PNAs have caused skin cancer in animals after prolonged and repeated contact. As a reference, most weathered crude is similar to used motor oil in skin toxicity; prolonged and repeated skin contact should be avoided, but there is no cause for concern if some gets on the skin. The typical skin problems from excessive skin contact are drying and cracking from the defatting action of the oil itself or from the soap or hand cleaners used to remove the oil, and pustules (similar to boils) if the oil plugs the sweat glands in the skin

  14. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    Energy Technology Data Exchange (ETDEWEB)

    Seed, Ian; James, Paula [Cogentus Consulting (United States); Mathieson, John [NDA United Kingdom (United Kingdom); Judd, Laurie [NuVision Engineering, Inc. (United States); Elmetti-Ramirez, Rosa; Han, Ana [US DOE (United States)

    2013-07-01

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  15. Investing in International Information Exchange Activities to Improve the Safety, Cost Effectiveness and Schedule of Cleanup - 13281

    International Nuclear Information System (INIS)

    With decreasing budgets and increasing pressure on completing cleanup missions as quickly, safely and cost-effectively as possible, there is significant benefit to be gained from collaboration and joint efforts between organizations facing similar issues. With this in mind, the US Department of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) have formally agreed to share information on lessons learned on the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of the cleanup legacy wastes. To facilitate information exchange a range of tools and methodologies were established. These included tacit knowledge exchange through facilitated meetings, conference calls and Site visits as well as explicit knowledge exchange through document sharing and newsletters. A DOE web-based portal has been established to capture these exchanges and add to them via discussion boards. The information exchange is operating at the Government-to-Government strategic level as well as at the Site Contractor level to address both technical and managerial topic areas. This effort has resulted in opening a dialogue and building working relationships. In some areas joint programs of work have been initiated thus saving resource and enabling the parties to leverage off one another activities. The potential benefits of high quality information exchange are significant, ranging from cost avoidance through identification of an approach to a problem that has been proven elsewhere to cost sharing and joint development of a new technology to address a common problem. The benefits in outcomes significantly outweigh the costs of the process. The applicability of the tools and methods along with the lessons learned regarding some key issues is of use to any organization that wants to improve value for money. In the waste management marketplace, there are a multitude of challenges being addressed by multiple organizations and

  16. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball

    2010-01-01

    Operational Experience At the end of the first full-year running period of LHC, CMS is established as a reliable, robust and mature experiment. In particular common systems and infrastructure faults accounted for <0.6 % CMS downtime during LHC pp physics. Technical operation throughout the entire year was rather smooth, the main faults requiring UXC access being sub-detector power systems and rack-cooling turbines. All such problems were corrected during scheduled technical stops, in the shadow of tunnel access needed by the LHC, or in negotiated accesses or access extensions. Nevertheless, the number of necessary accesses to the UXC averaged more than one per week and the technical stops were inevitably packed with work packages, typically 30 being executed within a few days, placing a high load on the coordination and area management teams. It is an appropriate moment for CMS Technical Coordination to thank all those in many CERN departments and in the Collaboration, who were involved in CMS techni...

  17. TECHNICAL COORDINATION

    CERN Multimedia

    A. Ball

    2010-01-01

    Operational Experience Since the closure of the detector in February, the technical operation of CMS has been quite smooth and reliable. Some minor interventions in UXC were required to cure failures of power supplies, fans, readout boards and rack cooling connections, but all these failures were repaired in scheduled technical stops or parasitically during access dedicated to fixing LHC technical problems. The only occasion when CMS had to request an access between fills was to search for the source of an alarm from the leak-detection cables mounted in the DT racks. After a few minutes of diagnostic search, a leaking air-purge was found. Replacement was complete within 2 hours. This incident demonstrated once more the value of these leak detection cables; the system will be further extended (during the end of year technical stop) to cover more racks in UXC and the floor beneath the detector. The magnet has also been operating reliably and reacted correctly to the 14s power cut on 29 May (see below). In or...

  18. Hanford Site cleanup and transition: Risk data needs for decision making (Hanford risk data gap analysis decision guide)

    International Nuclear Information System (INIS)

    Given the broad array of environmental problems, technical alternatives, and outcomes desired by different stakeholders at Hanford, DOE will have to make difficult resource allocations over the next few decades. Although some of these allocations will be driven purely by legal requirements, almost all of the major objectives of the cleanup and economic transition missions involve choices among alternative pathways. This study examined the following questions: what risk information is needed to make good decisions at Hanford; how do those data needs compare to the set(s) of risk data that will be generated by regulatory compliance activities and various non-compliance studies that are also concerned with risk? This analysis examined the Hanford Site missions, the Hanford Strategic Plan, known stakeholder values, and the most important decisions that have to be made at Hanford to determine a minimum domain of risk information required to make good decisions that will withstand legal, political, and technical scrutiny. The primary risk categories include (1) public health, (2) occupational health and safety, (3) ecological integrity, (4) cultural-religious welfare, and (5) socio-economic welfare

  19. Technical Training: Technical Training Seminar

    CERN Multimedia

    2004-01-01

    TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch Monday 9 February 2004 From 10:00 to 12:00 - IT Auditorium - bldg. 31, 3rd floor ANSOFT High-Frequency Seminar David Prestaux, Application Engineer, ANSOFT F-78535 BUC, France This Technical Training seminar will present two Ansoft application products: Ansoft HFSS and Ansoft Designer. Ansoft HFSS makes use of the Finite Element Method (FEM) to calculate field solutions from first principles. It can accurately predict all high-frequency behaviours such as dispersion, mode conversion, and losses due to materials and radiation. Ansoft Designer is a suite of design tools to fully integrate high-frequency, physics-based electromagnetic simulations into a seamless system-level simulation environment. Ansoft Designer uses a simple interface to give complete control over every design task, by a method allowing multiple solvers, Solver on Demand. • Introduction • Overview of the Ansoft Total solution • Ansoft HFSS 9...

  20. Answers to frequently asked questions about cleanup activities at Three Mile Island, Unit 2

    International Nuclear Information System (INIS)

    This question-and-answer report provides answers in nontechnical language to frequently asked questions about the status of cleanup activities at Three Mile Island, Unit 2. The answers update information first prepared in 1981, shortly after the cleanup got under way. Since then, a variety of important developments in the cleanup has occurred. The information in the report should be read in conjunction with NUREG 1060, a discussion of increased occupational exposure estimates for the cleanup. The questions and answers in this report cover purpose and community involvement, decontamination of water and reactor, fuel removal, radwaste transport, environmental impact, social and economic effects, worker exposures and safety, radiation monitoring, potential for accidents, and schedule and funding

  1. Cleanup and treatment of radioactively contaminated land including areas near nuclear facilities. A selected bibliography

    International Nuclear Information System (INIS)

    This annotated bibliography of 337 references summarizes the literature published on the cleanup and treatment of radioactively contaminated land. Specifically, this bibliography focuses on literature concerned with the methods of cleanup and treatment being applied - chemical, physical, or vegetative stabilization; the types of equipment being used; and the influence of climatic conditions on the method selected for use. The emphasis in such literature is placed on hazardous site cleanup efforts that have been completed as well as those that are in progress and are being planned. Appendix A includes 135 additional references to literature identified but not included in the bibliography because of time and funding constraints. Appendix B consists of a table that identifies the cleanup and treatment research conducted at specific sites. All of the information included in this bibliography is stored in a computerized form that is readily available upon request

  2. Options for improving hazardous waste cleanups using risk-based criteria

    International Nuclear Information System (INIS)

    This paper explores how risk- and technology-based criteria are currently used in the RCRA and CERCLA cleanup programs. It identifies ways in which risk could be further incorporated into RCRA and CERCLA cleanup requirements and the implications of risk-based approaches. The more universal use of risk assessment as embodied in the risk communication and risk improvement bills before Congress is not addressed. Incorporating risk into the laws and regulations governing hazardous waste cleanup, will allow the use of the best scientific information available to further the goal of environmental protection in the United States while containing costs. and may help set an example for other countries that may be developing cleanup programs, thereby contributing to enhanced global environmental management

  3. Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample

    International Nuclear Information System (INIS)

    In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.

  4. Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample

    Energy Technology Data Exchange (ETDEWEB)

    Crawford, C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-01-11

    In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.

  5. Technical safety

    International Nuclear Information System (INIS)

    Technical risks are compared to the publically consciously or unconsciously accepted risks. This kind of risk analysis has the aim to achieve an optimum safety with a justifiable effort. The realization of this target requires the solving of technical, economic and sociopolitical problems. In order to minimize the risk, one can reduce the probability of occurence as well as the extent of damage. Risk situations for the population due to natural occurences such as earthquakes, strike of lightning, frost, high water etc. can be relatively well quantified. These are therefore suitable a a basis for comparison. This basis risk is increased by individual traffic and by human force effects such as terror and war. On the other hand, life in the neighbourhood of a nuclear power plant does not measurably contribute to increasing individual risk. In principle, by increased expenditure one can reduce technical risks. Due to the lack of means, one must then save correspondingly somewhere else. The safety risks there can then possibly increase overproportionally or at least the wide-spread desire for a higher standard of living cannot be fulfilled. Nevertheless, absolute safety can never be reached. The insurance business is responsible for covering the financial damage. Fault trees are used in technology to analyse the weak points. This is explained taking the example of a propylene low-temperature tank. If one keeps below the base risk it must be possible to build technical plants, even nuclear power plants, in densely populated areas. Technical safety analyses, however, only embrace one side of it, rigid building and material control and extensive elimination of human error ar just as important. (orig.)

  6. Depleted uranium in the air during the cleanup operations at Cape Arza

    OpenAIRE

    PERKO VUKOTIC; MILOJKO KOVACEVIC; TOMISLAV ANDJELIC; MIRJANA RADENKOVIC

    2004-01-01

    Cape Arza was contaminated with depleted uranium (DU) in the air strikes of NATO aeroplanes on May 30, 1999. The cleanup and decontamination of the site started in 2001. Here the results of air monitoring performed during the cleanup operations in Spring 2002. are presented. The collected air samples were analyzed by high-resolution alpha spectrometry. The obtained concentrations of airborne uranium are about ten times higher than the average value usually reported for air. The ratio of the 2...

  7. Spreading, retention and clean-up of oil spills. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, Jr, M P

    1976-05-01

    This study reviews and assesses the technology of oil spill spreading, retention and cleanup and proposes research needs in these areas. Sources of oil spills are analyzed and the difficulty of gathering meaningful statistics is discussed. Barrier technology is reviewed and problem areas analyzed. Natural and forced biodegradation and natural and chemical dispersion of oil spills are considered. Research recommendations are categorized under the following two headings (1) Preventive techniques and (2) Containment, Cleanup and Dispersion.

  8. Technical Targets - A Tool to Support Strategic Planning in the Subsurface Contaminants Focus Area

    International Nuclear Information System (INIS)

    The Subsurface Contaminants Focus Area (SCFA) is supported by a lead laboratory consisting of technical representatives from DOE laboratories across the country. This broadly representative scientific group has developed and implemented a process to define Technical Targets to assist the SCFA in strategic planning and in managing their environmental research and development portfolio. At an initial meeting in Golden Colorado, an initial set of Technical Targets was identified using a rapid consensus based technical triage process. Thirteen Technical Targets were identified and described. Vital scientific and technical objectives were generated for each target. The targets generally fall into one of the following five strategic investment categories: Enhancing Environmental Stewardship, Eliminating Contaminant Sources, Isolating Contaminants, Controlling Contaminant Plumes, Enabling DOEs CleanUp Efforts. The resulting targets and the detail they comprise on what is, and what is not, needed to meet Environmental Management needs provide a comprehensive technically-based framework to assist in prioritizing future work and in managing the SCFA program

  9. Administrative practices to limit dose in environmental cleanup operations involving plutonium

    International Nuclear Information System (INIS)

    The Rocky Flats Plant is a U.S. Federal Government-owned contractor-operated facility utilizing plutonium, uranium, beryllium and other metals to fabricate nuclear components for the United States weapons programme. The plant is located 26km from Denver, Colorado. During the history of plant operations, various events occurred which allowed radioactivity to reach the environment. When these events occurred, plutonium operations in the United States were conducted under the guidance of ICRP 2 recommendations. Radioactivity concentrations measured in air, water, and soil, together with calculations of doses to workers and the population, were well within guide values. The advent of ALARA in 1973 (ICRP 22) and further development of dose limitation concepts (ICRP 26), necessitated reevaluation of contaminated areas to determine improvements that might be needed. Heightened public environmental interest and increased legal regulations emphasized the need to ensure that doses were limited to the lowest levels reasonably achievable. Documentation of past releases and a radiometric survey of the plant site identified areas where environmental cleanup could be beneficial. Cleanup priorities were established, and scope of work to be accomplished was defined for funding request. Stringent, but achievable, criteria were developed for environmental cleanup activities. Action limits far below existing legal limitations were defined based on background measurements and plant operating experience. Exposure and emission data were periodically reported. No measurable exposures resulted to workers involved in environmental cleanup efforts. Monitoring stations near cleanup areas show a decline in activity following cleanup efforts. (author)

  10. Assessment of coal gasification/hot gas cleanup based advanced gas turbine systems

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    The major objectives of the joint SCS/DOE study of air-blown gasification power plants with hot gas cleanup are to: (1) Evaluate various power plant configurations to determine if an air-blown gasification-based power plant with hot gas cleanup can compete against pulverized coal with flue gas desulfurization for baseload expansion at Georgia Power Company's Plant Wansley; (2) determine if air-blown gasification with hot gas cleanup is more cost effective than oxygen-blown IGCC with cold gas cleanup; (3) perform Second-Law/Thermoeconomic Analysis of air-blown IGCC with hot gas cleanup and oxygen-blown IGCC with cold gas cleanup; (4) compare cost, performance, and reliability of IGCC based on industrial gas turbines and ISTIG power island configurations based on aeroderivative gas turbines; (5) compare cost, performance, and reliability of large (400 MW) and small (100 to 200 MW) gasification power plants; and (6) compare cost, performance, and reliability of air-blown gasification power plants using fluidized-bed gasifiers to air-blown IGCC using transport gasification and pressurized combustion.

  11. Decontamination systems information and research program. Quarterly report, January 1996--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    West Virginia University (WVU) and the US Department of Energy, Morgantown Energy Technology Center (DOE/METC) entered into a Cooperative Agreement in August 1992 titled {open_quotes}Decontamination Systems Information and Research Programs{close_quotes} (DOE Instrument No.: DE-FC21-92MC29467). Requirements stipulated by the Agreement require WVU to submit quarterly Technical Progress reports. This report contains the efforts of the research projects comprising the Agreement for the 1st calendar quarter of 1996. For the period January 1 through December 31, 1996 twelve projects have been selected for funding, and the Kanawha Valley will continue under a no-cost extension. Three new projects have also been added to the program. This document describes these projects involving decontamination, decommissioning and remedial action issues and technologies.

  12. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-04-04

    This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’ Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.

  13. Decontamination systems information and research program. Quarterly report, January 1996--March 1996

    International Nuclear Information System (INIS)

    West Virginia University (WVU) and the US Department of Energy, Morgantown Energy Technology Center (DOE/METC) entered into a Cooperative Agreement in August 1992 titled open-quotes Decontamination Systems Information and Research Programsclose quotes (DOE Instrument No.: DE-FC21-92MC29467). Requirements stipulated by the Agreement require WVU to submit quarterly Technical Progress reports. This report contains the efforts of the research projects comprising the Agreement for the 1st calendar quarter of 1996. For the period January 1 through December 31, 1996 twelve projects have been selected for funding, and the Kanawha Valley will continue under a no-cost extension. Three new projects have also been added to the program. This document describes these projects involving decontamination, decommissioning and remedial action issues and technologies

  14. CORTICAL CLEANUP WITHOUT SIDE PORT IN SMALL INCISION CATARACT SURGERY

    Directory of Open Access Journals (Sweden)

    Udaya Kumar

    2015-11-01

    Full Text Available The aim of study was to achieve complete cortical cleanup and avoid problems related with sideport during Small Incision Cataract Surgery (SICS so as to have a good visual out come with minimal recovery period, and a better quality of life. After nucleus delivery, cortical cleanup is an important step in any cataract surgical procedure. Cortex especially subincisional area (11 to 1 o’clock is difficult to manage intraoperatively. Bimanual irrigation aspiration through two side ports, aspiration by J cannula, iris massage manoeuver, ice cream scoop manoeuver are various techniques of cortical matter aspiration. We acquired the technique of aspiration of subincisional cortex without using side port in all cases by paying attention on type of cataract, status of pupil, use of Adrenalin mixed BSS intraoperatively, Tunnel construction, Capsulorhexis size and capsular rim size at 12 o’clock. MATERIAL AND METHODS In this retrospective study of 1 year from 2013 to 2014, 60 patients (60 eyes aged 40 years or older attending the General Ophthalmic Department were included in the study group with another group of 60 patients (60 eyes as controls. The study was on age related cataracts which are basically. 1 Cortical cataract 2 Nuclear cataract 3 Subcapsular cataract. Proper assessment of cortical cataract based on its maturity such as a Immature b Mature c Hyper mature and d Morgagnian cataract, nucleus for its opalescence and color, size of posterior subcapsular opacity and pupillary status (Dilating well or not with mydriatics were taken into consideration. Eyes with pseudoexfoliation having poor pupillary dilation were also included. Eyes with congenital anomalies, congenital cataract, gross corneal and retinal pathologies, and glaucoma were excluded. RESULTS Among 60 study eyes in the study group 35 presented with cortical, 20 with nuclear cataract and 5 with posterior subcapsular cataracts. In 58(96.6% cases, sideport was not required; 3(5% eyes

  15. Cleanup under Airlock of an Old Uranium Foundry - 13273

    International Nuclear Information System (INIS)

    Since 2004, AREVA's subsidiary SICN has been conducting the cleanup and dismantling of an old uranium foundry located in the town of Annecy (France). The first operations consisted in the removal of the foundry's production equipment, producing more than 300 metric tons (MT) of waste. The second step consisted in performing the radiological characterization of the 1,600 m2 (17,200 ft2) building, including underground trenches and galleries. The building was precisely inventoried, based on operations records and direct measurements. All sub-surfaces, which needed to be cleaned up were characterized, and a determination of the contamination migration was established, in particular with trenches and galleries. The wall thicknesses to be treated were empirically justified, knowing that the maximal migration depth inside concrete is 5 mm for a liquid transfer vector. All singularities such as cracks, anchoring points, etc. were spotted for a complete and systematic treatment. Building structures not laying directly on the soil, such as floor slabs, were not cleaned up but directly deconstructed and disposed of as waste. The facility was located within the town of Annecy. Therefore, in order to avoid the risk of dusts dispersion and public exposure during the building deconstruction and the soil treatment, a third of the building's surface was confined in a sliding airlock built from a metal structure capable of resisting to wind and snow, which are frequent in this area. This particular structure provided a static confinement over the half of the building which was covered and a dynamic confinement using a ventilation and high efficiency air filtration system, sized to provide 2.5 air changes per hour. The enclosure and its metallic structure is 33 m long (108 feet), 25 m wide (82 feet), and 13 m high (42 feet), for a volume of 10,000 m3 (353,000 ft3). It was made up of a double skin envelope, allowing the recycling of its structure and outside envelope. After cleaning

  16. ARM Operations Quarterly Report October 1-December 31, 2013

    Energy Technology Data Exchange (ETDEWEB)

    Voyles, Jimmy W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-31

    The U.S. Department of Energy requires national user facilities to report time-based operating data. This quarterly report is written to comply with this requirement. This reports on the first quarter facility statistics.

  17. New technologies aid DOE in site characterization, cleanup

    International Nuclear Information System (INIS)

    The Department of Energy is using what reportedly is the world's largest remotely operated mobile-work system to excavate a landfill contaminated with radioactive materials at the Idaho National Engineering Laboratory. The 1,500-ton, self-propelled machine made by Sonsub Inc. (Houston) will span and excavate landfills up to 120 feet wide. As the unit digs, it will separate waste from the soil, package the waste for transport, then backfill the pit. DOE will use the machine to excavate Pit 9, a 400-foot-long, 120-foot-wide landfill that was used as a waste-disposal site in the 1960s. Using computer modeling applications to identify hazardous and radioactive wastes can protect workers from exposure and, in some cases, reduce remediation costs. Canberra Industries (Meridien, Conn.) in November was awarded a contract by EG and G Mound Applied Technologies to perform gamma spectroscopy radiological waste characterization on waste containers that have been stored since 1978 at the Mound site in Ohio. The 55-gallon drums and boxes at the site reportedly contain transuranic waste; however, officials say they anticipate that, once characterization is performed, about 25% of the waste will be downgraded to low-level waste (below 100nCI/gm). In another application involving landfill cleanup, Komar Industries Inc. (Groveport, Ohio) in late 1995 was contracted to design and construct a system for processing radioactive waste from an unnamed DOE landfill. The company says it will design a triauger with injector configuration to serve as a fully contained size-reduction, blending and feeding system that will allow engineers to blend a variety of wastes found at the site. Machined, O-ring, sealed surfaces will maintain a negative water column under normal operations. The system will be designed to handle pressures up to 10 bar, while the processor will have a 6-cubic-yard charge capacity and the ability to accept 15 to 20 charges per hour

  18. North Slope (Wahluke Slope) expedited response action cleanup plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

  19. North Slope (Wahluke Slope) expedited response action cleanup plan

    International Nuclear Information System (INIS)

    The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi2 (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives

  20. TECHNICAL COORDINATION

    CERN Document Server

    A. Ball and W. Zeuner

    2011-01-01

    In this report we will review the main achievements of the Technical Stop and the progress of several centrally-managed projects to support CMS operation and maintenance and prepare the way for upgrades. Overview of the extended Technical Stop  The principal objectives of the extended Technical Stop affecting the detector itself were the installation of the TOTEM T1 telescopes on both ends, the readjustment of the alignment link-disk in YE-2, the replacement of the light-guide sleeves for all PMs of both HFs, and some repairs on TOTEM T2 and CASTOR. The most significant tasks were, however, concentrated on the supporting infrastructure. A detailed line-by-line leak search was performed in the C6F14 cooling system of the Tracker, followed by the installation of variable-frequency drives on the pump motors of the SS1 and SS2 tracker cooling plants to reduce pressure transients during start-up. In the electrical system, larger harmonic filters were installed in ...