Sample records for characterization work plan

  1. In-situ bioremediation drilling and characterization work plan

    International Nuclear Information System (INIS)

    This work plan describes the design and construction of proposed wells and outlines the characterization activities to be performed in support of the In Situ Bioremediation Task for FY 1994. The purpose of the well-design is to facilitate implementation and monitoring of in situ biodegradation of CCl4 in ground water. However, the wells will also be used to characterize the geology, hydrology, microbiology, and contaminant distribution, which will all feed into the design of the technology. Implementation and design of this remediation demonstration technology will be described separately in an integrated test plan

  2. Site Characterization Work Plan for Gasbuggy, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2000-12-14

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  3. In-well vapor stripping drilling and characterization work plan

    International Nuclear Information System (INIS)

    This work plan provides the information necessary for drilling, sampling, and hydrologic testing of wells to be completed in support of a demonstration of the in-well vapor stripping system. The in-well vapor stripping system is a remediation technology designed to preferentially extract volatile organic compounds (VOCs) from contaminated groundwater by converting them to a vapor phase. Air-lift pumping is used to lift and aerate groundwater within the well. The volatiles escaping the aerated water are drawn off by a slight vacuum and treated at the surface while the water is allowed to infiltrate the vadose zone back to the watertable

  4. Project Work Plan Chromium Vadose Zone Characterization and Geochemistry

    Energy Technology Data Exchange (ETDEWEB)

    Ainsworth, Calvin C.

    2006-05-23

    The major objectives of the proposed study are to 1) determine the leaching characteristics of Cr(VI) from contaminated sediments collected from 100 area spill sites, 2) elucidate possible Cr(VI) mineral and/or chemical associations that may be responsible for Cr(VI) retention in the Hanford site 100 areas through the use of i) macroscopic solubility studies and ii) microscale characterization of contaminated sediments, and 3) from these data construct a conceptual model of Cr(VI) geochemistry in the Hanford 100 area vadose zone. These objectives are based on locating and obtaining contaminated sediment with depth and at varying Cr(VI) concentrations as we hypothesize that mineral/chemical-Cr(VI) associations should be related to the total Cr concentration and other master geochemical variables (e.g., pH, counter-cation type and concentration, and water content). In addressing these objectives, additional benefits accrued will be (1) a fuller understanding of Cr(VI) entrained in the vadose zone that will that can be utilized in modeling potential Cr(VI) source terms, and 2) accelerating the Columbia River 100 area corridor cleanup by developing remedial action based on a fundamental understanding of Cr(VI) vadose zone geochemistry.

  5. Technical work plan for the privatization waste characterization data quality objective process

    International Nuclear Information System (INIS)

    This work plan addresses the activities necessary to complete the data quality objectives process for the purpose of providing sufficient characterization information to successfully stage, pretreat, and immobilize low-activity waste per the requirements and specifications identified in the Tank Waste Remediation System Privatization Request for Proposal. The scope of this task is to complete the data quality objectives process, the results of which will provide a technical basis for sampling and characterization needs related to privatization of pretreatment and low-activity waste immobilization

  6. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  7. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  8. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-25

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  9. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002); FINAL

    International Nuclear Information System (INIS)

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities

  10. Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    The health and safety plan/work plan describes a strategy for characterizing the contents of 172 liquid waste and 33 solid waste drums. It also addresses the control measures that will be taken to (1) prevent or minimize any adverse impact on the environment or personnel safety and health and (2) meet standards that define acceptable management of hazardous and radioactive materials and wastes. When writing this document, the authors considered past experiences, recommendations, and best management practices to minimize possible hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or unplanned releases of hazardous or radioactive materials to air, soil, or surface water

  11. Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Abston, J.P.; Burman, S.N.; Jones, D.L.

    1995-10-01

    The health and safety plan/work plan describes a strategy for characterizing the contents of 172 liquid waste and 33 solid waste drums. It also addresses the control measures that will be taken to (1) prevent or minimize any adverse impact on the environment or personnel safety and health and (2) meet standards that define acceptable management of hazardous and radioactive materials and wastes. When writing this document, the authors considered past experiences, recommendations, and best management practices to minimize possible hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or unplanned releases of hazardous or radioactive materials to air, soil, or surface water.

  12. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002); FINAL

    International Nuclear Information System (INIS)

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document

  13. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  14. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan

  15. Site characterization plan:

    International Nuclear Information System (INIS)

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs

  16. Site characterization plan:

    International Nuclear Information System (INIS)

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed

  17. Enhanced radiological work planning; TOPICAL

    International Nuclear Information System (INIS)

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  18. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm;

    2012-01-01

    trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  19. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  20. TWRS Systems Engineering Working Plan

    International Nuclear Information System (INIS)

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations

  1. 105-C Facility characterization plan

    International Nuclear Information System (INIS)

    This facility characterization plan is a site-specific document that describes how quantification and qualification of the radiological sources and the radioactive contamination in the 105-C Building will be accomplished. Characterization of hazardous materials will be addressed in a separate plan. This plan was developed from review of video tapes, photographs, and records. The purpose of this characterization plan is to provide an efficient and cost-effective method for determining the distribution of radioactive contamination at the 105-C Facility

  2. PUREX facility preclosure work plan

    Energy Technology Data Exchange (ETDEWEB)

    Engelmann, R.H.

    1997-04-24

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D).

  3. PUREX facility preclosure work plan

    International Nuclear Information System (INIS)

    This preclosure work plan presents a description of the PUREX Facility, the history of the waste managed, and addresses transition phase activities that position the PUREX Facility into a safe and environmentally secure configuration. For purposes of this documentation, the PUREX Facility does not include the PUREX Storage Tunnels (DOE/RL-90/24). Information concerning solid waste management units is discussed in the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Appendix 2D)

  4. Radiological Work Planning and Procedures

    International Nuclear Information System (INIS)

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD

  5. Final work plan: Expedited Site Characterization of the IES Industries, Inc., Site at Marshalltown, Iowa. Ames Expedited Site Characterization Project, Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-04

    The overall goal of the Ames Laboratory Expedited Site Characterization (ESC) project is to evaluate and promote both innovative and state-of-the-practice site characterization and/or monitoring technologies. This will be accomplished by fielding both types of technologies together in the context of an expedited site characterization. The first site will be at a former manufactured gas plant (FMGP) in Marshalltown, Iowa. The project will field three areas of technology: geophysical, analytical, and data fusion. Geophysical technologies are designed to understand the subsurface geology to help predict fate and transport of the target contaminants. Analytical technologies/methods are designed to detect and quantify the target contaminants. Data fusion technology consists of software systems designed to rapidly integrate or fuse all site information into a conceptual site model that then becomes the decision making tool for the site team to plan subsequent sampling activity. Not all of the contaminants present can be located at the action level. Polynuclear aromatic hydrocarbons (PAHs) are the signature organics associated with the coal tar activities that took place at the site. As a result, PAHs were selected as the target compounds. Screening analytical instruments and nonintrusive geophysical techniques will be fielded to qualitatively map the spatial contaminant distribution. Soil gas surveys, immunoassay testing (IMA), innovative optical techniques, and passive organic sorbent sensors will be deployed along with the geophysical methods. Gas chromatography/mass spectrometry (GC/MS) instruments and a cone penetrometer system equipped with a laser-induced fluorescence (LIF) probe will quantitatively map the action level edges of the PAH plume(s). Samples will be taken both by the cone penetrometer test system (CPT) and the Geoprobe {reg_sign} sampler system.

  6. Characterization Of Robot Work Cell

    Science.gov (United States)

    Anderson, Ronald R.; Paternoster, Vincent Y.; Guthmiller, Wayne A.

    1990-01-01

    Iterative process of measurement and computation used to characterize work cell of robot, increasing accuracy of mathematical model of work cell. Characterization needed because model used in off-line programming (OLP) to compute paths to control motion of robot. Increases accuracies of model and paths.

  7. Technical WOrk Plan for: Construction Effects Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    S. Goodin

    2006-09-14

    This document is the technical work plan (TWP) for performing the Construction Effects Monitoring (CEM) activity, which is one of 20 testing and monitoring activities included in Performance Confirmation Plan (BSC 2004 [DIRS 172452]). Collectively, the 20 activities make up the Performance Confirmation Program described in the plan. Each of the other 19 activities will have a separate TWP. This plan, though titled Construction Effects Monitoring, in accordance with the Performance Confirmation Plan, also includes testing that may be performed in addition to monitoring, if required. Performance confirmation is required by regulation 10 CFR Part 63 [DIRS 173273], and was started during site characterization (consistent with the regulation) and will continue until permanent closure of the repository (10 CFR 63.13 1 (b) [DIRS 173273]). This CEM activity has two primary goals: (1) to collect, analyze, and report on repository rock properties data for the purpose of confirming geotechnical and design parameters used in repository design, and (2) to provide information intended to confirm that the ability to retrieve waste from the repository has been preserved. It will be necessary for information from this CEM activity to be evaluated in combination with that obtained from other Performance Confirmation Program activities to achieve these goals. These relationships with other Performance Confirmation Program activities (e.g., drift inspection, subsurface mapping, and seismicity monitoring) will be discussed in later sections of this TWP.

  8. Technical Work Plan for: Construction Effects Monitoring

    International Nuclear Information System (INIS)

    This document is the technical work plan (TWP) for performing the Construction Effects Monitoring (CEM) activity, which is one of 20 testing and monitoring activities included in Performance Confirmation Plan (BSC 2004 [DIRS 172452]). Collectively, the 20 activities make up the Performance Confirmation Program described in the plan. Each of the other 19 activities will have a separate TWP. This plan, though titled Construction Effects Monitoring, in accordance with the Performance Confirmation Plan, also includes testing that may be performed in addition to monitoring, if required. Performance confirmation is required by regulation 10 CFR Part 63 [DIRS 173273], and was started during site characterization (consistent with the regulation) and will continue until permanent closure of the repository (10 CFR 63.13 1 (b) [DIRS 173273]). This CEM activity has two primary goals: (1) to collect, analyze, and report on repository rock properties data for the purpose of confirming geotechnical and design parameters used in repository design, and (2) to provide information intended to confirm that the ability to retrieve waste from the repository has been preserved. It will be necessary for information from this CEM activity to be evaluated in combination with that obtained from other Performance Confirmation Program activities to achieve these goals. These relationships with other Performance Confirmation Program activities (e.g., drift inspection, subsurface mapping, and seismicity monitoring) will be discussed in later sections of this TWP

  9. A Marketing Plan That Works

    Science.gov (United States)

    Sparks, Jack D.

    1976-01-01

    Olivet College's marketing plan included survey of students, alumni, townspeople, and doners and analysis of the college's customer appeal, prices, and product mix. The author reports that the marketing objectives are being met and discusses the rationale and problems of applying business marketing principles to education. (JT)

  10. Materials Characterization Center program plan

    International Nuclear Information System (INIS)

    The Materials Characterization Center (MCC) has been established at Pacific Northwest Laboratory as part of the Materials Characterization Organization for providing an authoritative, referenceable basis for establishing nuclear waste material properties and test methods. The MCC will provide a data base that will include information on the components of the waste emplacement package - the spent fuel or processed waste form and the engineered barriers - and their interaction with each other and as affected by the environment. The MCC will plan materials testing, develop and document procedures, collect and analyze existing materials data, and conduct tests as necessary

  11. WRAP process area development control work plan

    Energy Technology Data Exchange (ETDEWEB)

    Leist, K.L., Fluor Daniel Hanford

    1997-02-27

    This work plan defines the manner in which the Waste Receiving and Processing Facility, Module I Process Area will be maintained under development control status. This status permits resolution of identified design discrepancies, control system changes, as-building of equipment, and perform modifications to increase process operability and maintainability as parallel efforts. This work plan maintains configuration control as these efforts are undertaken. This task will end with system testing and reissue of field verified design drawings.

  12. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  13. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  14. Housekeeping category corrective action unit work plan

    International Nuclear Information System (INIS)

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process

  15. Work Plan of Digitizing Chinese Photographic Plates

    OpenAIRE

    Tang, Zheng-Hong; Zhao, Jian-Hai; Yu, Yong

    2012-01-01

    Supported by Ministry of of Science and Technology of China, the project of digitizing Chinese photographic plates starts from April of 2012 and will last 5 years. Over 30000 plates covering different kinds of objects, such as binaries, variable stars, radio stars, asteroids, comets, extragalactic galaxies, and so on, will be scanned by a special scanner with high precision astrometry and photometry. The initial work plan of this project is introduced. Collaboration with colleagues with good ...

  16. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  17. Production, staff, working time and financial planning

    OpenAIRE

    Orlando Boiteux; Albert Corominas; Amaia Lusa; Carme Martinez

    2009-01-01

    Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.

  18. Integrating ALARA into work planning and organization

    International Nuclear Information System (INIS)

    This paper presents various organizational structures and systematic approaches that can be of benefit in integrating ALARA into work planning and organization. It is possible to have elegant policy statements, procedures and organizations and yet fail to implement ALARA effectively. The real key to success in ALARA work management is to recognize that ALARA is primarily a way of thinking and to secure the commitment of individuals at all levels within the organization, from senior management to workers carrying out specific tasks. The authors explain that the recommendations of ICRP Publication 60 will have an impact and will maintain the downward pressure on individual doses. 6 figs

  19. 7 CFR 23.6 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall...

  20. 7 CFR 23.13 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.13 Section 23.13 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded...

  1. Wyoming Basin Rapid Ecoregional Assessment: Work Plan

    Science.gov (United States)

    Carr, Natasha B.; Garman, Steven L.; Walters, Annika; Ray, Andrea; Melcher, Cynthia P.; Wesner, Jeff S.; O’Donnell, Michael S.; Sherrill, Kirk R.; Babel, Nils C.; Bowen, Zachary H.

    2013-01-01

    The overall goal of the Rapid Ecoregional Assessments (REAs) being conducted for the Bureau of Land Management (BLM) is to provide information that supports regional planning and analysis for the management of ecological resources. The REA provides an assessment of baseline ecological conditions, an evaluation of current risks from drivers of ecosystem change, and a predictive capacity for evaluating future risks. The REA also may be used for identifying priority areas for conservation or restoration and for assessing the cumulative effects of a variety of land uses. There are several components of the REAs. Management Questions, developed by the BLM and partners for the ecoregion, identify the information needed for addressing land-management responsibilities. Conservation Elements represent regionally significant aquatic and terrestrial species and communities that are to be conserved and (or) restored. The REA also will evaluate major drivers of ecosystem change (Change Agents) currently affecting or likely to affect the status of Conservation Elements. We selected 8 major biomes and 19 species or species assemblages to be included as Conservation Elements. We will address the four primary Change Agents—development, fire, invasive species, and climate change—required for the REA. The purpose of the work plan for the Wyoming Basin REA is to document the selection process for, and final list of, Management Questions, Conservation Elements, and Change Agents. The work plan also presents the overall assessment framework that will be used to assess the status of Conservation Elements and answer Management Questions.

  2. Participatory planning intercultural: Reflections for social work

    Directory of Open Access Journals (Sweden)

    Esperanza Gómez Hernández

    2012-01-01

    Full Text Available Since the nineties, participatory planning has emerged as a linking strategy for various social, political, economic and cultural sectors that assessed it as a potential for building consensus in the making of local processes forsocial improvement. Similarly, it was legitimized as a setting for practice for professionals trained in the social sciences, mainly Social Work. This article, from a geopolitical and geo-cultural perspective, presents contextual elements that determined the configuration of participatory planning in Latin America. These elements shall be staged in order to redefine diversity and the intercultural perspective that has been linked to this mobilizing strategy, against the institutionalized discourse of development and for the emergence of crisis and ruptures with this social paradigm from other practices and worldviews of life in the territories.

  3. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  4. TRU waste inventory collection and work off plans for the centralization of TRU waste characterization/certification at INL - on your mark - get set - 9410

    Energy Technology Data Exchange (ETDEWEB)

    Mctaggert, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila A [Los Alamos National Laboratory; Gadbury, Casey [CBFO

    2008-01-01

    The U.S. Department of Energy (DOE) amended the Record of Decision (ROD) for the Waste Management Program: Treatment and Storage of Transuranic Waste to centralize transuranic (TRU) waste characterization/certification from fourteen TRU waste sites. This centralization will allow for treatment, characterization and certification ofTRU waste from the fourteen sites, thirteen of which are sites with small quantities ofTRU waste, at the Idaho National Laboratory (INL) prior to shipping the waste to the Waste Isolation Pilot Plant (WIPP) for disposal. Centralization of this TRU waste will avoid the cost of building treatment, characterization, certification, and shipping capabilities at each of the small quantity sites that currently do not have existing facilities. Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Nuclear Technology and Engineering Center (INTEC) will provide centralized shipping facilities, to WIPP, for all of the small quantity sites. Hanford, the one large quantity site identified in the ROD, has a large number of waste in containers that are overpacked into larger containers which are inefficient for shipment to and disposal at WIPP. The AMWTF at the INL will reduce the volume of much of the CH waste and make it much more efficient to ship and dispose of at WIPP. In addition, the INTEC has a certified remote handled (RH) TRU waste characterization/certification program at INL to disposition TRU waste from the sites identified in the ROD.

  5. TRU waste inventory collection and work-off plans for the centralization of TRU waste characterization at INL - on your mark - get set - 9410

    Energy Technology Data Exchange (ETDEWEB)

    Mctaggert, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila [Los Alamos National Laboratory; Gadbury, Casey [CBFO

    2009-01-01

    The U.S. Department of Energy (DOE) amended the Record of Decision (ROD) for the Waste Management Program: Treatment and Storage ofTransuranic Waste to centralize transuranic (TRU) waste characterization/certification from fourteen TRU waste sites. This centralization will allow for treatment, characterization and certification ofTRU waste from the fourteen sites, thirteen of which are sites with small quantities ofTRU waste, at the Idaho National Laboratory (INL) prior to shipping the waste to the Waste Isolation Pilot Plant (WIPP) for disposal. Centralization ofthis TRU waste will avoid the cost ofbuilding treatment, characterization, certification, and shipping capabilities at each ofthe small quantity sites that currently do not have existing facilities. Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Nuclear Technology and Engineering Center (INTEC) will provide centralized shipping facilities, to WIPP, for all ofthe small quantity sites. Hanford, the one large quantity site identified in the ROD, has a large number ofwaste in containers that are overpacked into larger containers which are inefficient for shipment to and disposal at WIPP. The AMWTP at the INL will reduce the volume ofmuch of the CH waste and make it much more efficient to ship and dispose of at WIPP. In addition, the INTEC has a certified remote handled (RH) TRU waste characterization/certification program at INL to disposition TRU waste from the sites identified in the ROD.

  6. Tank 241-TY-101 Tank Characterization Plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-TY-101

  7. Tank 241-C-101 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-C-101

  8. Tank 241-U-105 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-U-105

  9. Tank 241-C-101 tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D.

    1994-12-06

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-C-101.

  10. Tank 241-AX-102 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-AX-102

  11. Tank 241-S-111: Tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, ORNL, and PNL tank vapor program. Scope of this plan is to provide guidance for sampling and analysis of vapor samples from tank 241-S-111 (this tank is on the organic and flammable gas watch list). This tank received Redox plant waste, among other wastes

  12. Tank 241-U-103 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-U-103

  13. Tank 241-BY-105 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, PNL 325 Analytical Chemistry Laboratory, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-BY-105

  14. Tank 241-U-204 tank characterization plan

    International Nuclear Information System (INIS)

    This document is the tank characterization plan for Tank 241-U-204 located in the 200 Area Tank Farm on the Hanford Reservation in Richland, Washington. This plan describes Data Quality Objectives (DQO) and presents historical information and scheduled sampling events for tank 241-U-204

  15. Tank 241-BX-103 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-BX-103

  16. Tank 241-SX-103 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-SX-103

  17. Tank 241-C-102 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-C-102

  18. Tank 241-AP-107 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-AP-107

  19. Tank 241-S-111: Tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Homi, C.S.

    1995-03-07

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, ORNL, and PNL tank vapor program. Scope of this plan is to provide guidance for sampling and analysis of vapor samples from tank 241-S-111 (this tank is on the organic and flammable gas watch list). This tank received Redox plant waste, among other wastes.

  20. Tank 241-TY-104 Tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D. [Westinghouse Hanford Co., Richland, WA (United States)

    1995-02-15

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 222-C Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-TY-104.

  1. Tank 241-BX-104 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-BX-104

  2. Tank 241-T-107 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-T-107

  3. Tank 241-TY-106 Tank Characterization Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D.

    1995-02-22

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-TY-106.

  4. Tank 241-BX-103 tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Bell, K.E. [Westinghouse Hanford Co., Richland, WA (United States)

    1995-04-21

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-BX-103.

  5. Tank 241-C-203: Tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D.

    1995-03-06

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 222-S Laboratory. Scope of this plan is to provide guidance for sampling and analysis of samples for tank 241-C-203.

  6. Tank 241-U-201 tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D.

    1995-02-21

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 22-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-U-201.

  7. Tank 241-SX-115 tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, L.M.

    1995-04-24

    This document is a plan which serves as the contractual agreement between the Characterization Project, Sampling Operations, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-SX-115.

  8. Tank 241-C-202: Tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D.

    1995-03-06

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 222-S Laboratory. Scope of this plan is to provide guidance for sampling and analysis of samples for tank 241-C-202.

  9. Tank 241-U-202 tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D.

    1995-02-21

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-U-202.

  10. Tank 241-BY-106 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, PNL 325 Analytical Chemistry Laboratory, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-BY-106

  11. Tank 241-SX-115 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Project, Sampling Operations, and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-SX-115

  12. Tank 241-TY-101 Tank Characterization Plan

    Energy Technology Data Exchange (ETDEWEB)

    Homi, C.S.

    1995-03-20

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-TY-101.

  13. Tank 241-BY-103 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, Oak Ridge National Laboratory, and PNL 329 Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-BY-103

  14. Tank 241-T-111 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-T-111

  15. Tank 241-TX-105 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, Oak Ridge National Laboratory, and PNL tank vapor program. The scope of this plan is to provide guidance for the sampling and analysis of vapor samples from tank 241-TX-105

  16. Tank 241-C-105 tank characterization plan

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-C-105

  17. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  18. Site characterization plan thermal goals reevaluation

    International Nuclear Information System (INIS)

    The Site Characterization Plan (SCP) (DOE, 1988) attempted to define surrogate criteria that could be used to establish potential repository performance. These criteria or SCP thermal goals were developed from knowledge existing at the time and, as a reference case, emphasized performance for waste emplacement in a vertical borehole. Since that time, new knowledge has become available and some additional analyses of thermal loading have been performed. Additionally, other emplacement modes such as in-drift emplacement are being considered to accommodate larger waste packages. New concepts such as ''extended hot'' are also being considered as possible methods to achieve improved waste isolation. Thus it became clear that the thermal goals established in the SCP should be reevaluated. A Working Group was formed to reassess the SCP thermal goals to determine whether each goal was still valid, if there were goals that needed to be added, and what if any effort was needed to reduce the uncertainty associated with a particular goal. The objectives of the effort were to: (1) provide thermal goals that would support the FY 1993 Thermal Loading Systems Study; (2) help focus the planned testing and analysis efforts; and (3) acquire data that potentially could be used to initiate a change to the project technical baseline. Sixteen thermal goals were evaluated; fifteen were from various sections of the SCP; one goal was added, and another was split into two to include in-drift emplacement. The group's findings and recommendations are presented

  19. Material stabilization characterization management plan

    International Nuclear Information System (INIS)

    This document presents overall direction for characterization needs during stabilization of SNM at the Plutonium Finishing Plant (PFP). Technical issues for needed data and equipment are identified. Information on material categories and links to vulnerabilities are given. Comparison data on the material categories is discussed to assist in assessing the relative risks and desired processing priority

  20. Remedial investigation work plan for the Upper East Fork Poplar Creek characterization area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Oak Ridge Y-12 Plant, located within the Oak Ridge Reservation (ORR), is owned by the US Department of Energy (DOE) and managed by Lockheed Martin Energy Systems, Inc. The entire ORR was placed on the National Priorities List (NPL) of CERCLA sites in November 1989. Following CERCLA guidelines, sites under investigation require a remedial investigation (RI) to define the nature and extent of contamination, evaluate the risks to public health and the environment, and determine the goals for a feasibility study (FS) of potential remedial actions. The need to complete RIs in a timely manner resulted in the establishment of the Upper East Fork Poplar Creek (UEFPC) Characterization Area (CA) and the Bear Creek CA. The CA approach considers the entire watershed and examines all appropriate media within it. The UEFPC CA, which includes the main Y-12 Plant area, is an operationally and hydrogeologically complex area that contains numerous contaminants and containment sources, as well as ongoing industrial and defense-related activities. The UEFPC CA also is the suspected point of origin for off-site groundwater and surface-water contamination. The UEFPC CA RI also will address a carbon-tetrachloride/chloroform-dominated groundwater plume that extends east of the DOE property line into Union Valley, which appears to be connected with springs in the valley. In addition, surface water in UEFPC to the Lower East Fork Poplar Creek CA boundary will be addressed. Through investigation of the entire watershed as one ``site,`` data gaps and contaminated areas will be identified and prioritized more efficiently than through separate investigations of many discrete units.

  1. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge will begin developing its Comprehensive Conservation Plan in fiscal year 2005. This Annual Habitat Work Planning report will summarize accomplishments...

  2. 10 CFR 60.17 - Contents of site characterization plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Contents of site characterization plan. 60.17 Section 60... GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.17 Contents of site characterization plan. The site characterization plan shall contain— (a) A general plan for site characterization activities to...

  3. Quadrant I RCRA Facility Investigation Work Plan

    International Nuclear Information System (INIS)

    The objective of this Facility Investigation (FRI) at the Portsmouth Gaseous Diffusion Plant (PORTS) is to acquire, analyze and interpret data which will: (1) characterize the environmental setting including ground water, surface water and sediment, soil and air; (2) define and characterize sources of contamination; (3) characterize the vertical and horizontal extent and degree of contamination of the environment; (4) assess the risk to human health and the environment resulting from possible exposure to contaminants; and, (5) support the Corrective Measures Study (CMS) which will follow the RFI. Investigations to characterize the environmental setting, sources of contamination, and vertical and horizontal extent and degree of contamination will be conducted relative to individual potential sources which have been identified in the Quadrant I Description of Current Conditions. These unit investigations will follow the systematic approach which is outlined below

  4. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential...

  5. Planning that works: Empowerment through stakeholder focused interactive planning (SFIP)

    International Nuclear Information System (INIS)

    This paper describes a powerful planning tool that can enable government, private industries, and public interest organizations to actualize their visions through sound decision making. The stakeholder focused interactive planning model is designed to integrate and ultimately gain stakeholder investment in the success of attainment of their vision. The only concessions required of the planning organization using this process is the acceptance of the premise that sustained vision success requires the support of both internal and external stakeholders and that each step in the process must be used as a validation of the previous step and essential to the completion of the next step. What is stakeholder/public involvement? It is the process in which the stakeholders (both internal and external) values, interests and expectations are included in decision-making processes. The primary goal of public involvement efforts is to include all those who have a stake in the decision, whether or not they have already been identified. Stakeholders are individuals, contractors, clients, suppliers, public organizations, state and local governments, Indian tribes, federal agencies, and other parties affected by decisions

  6. Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches

    International Nuclear Information System (INIS)

    This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs

  7. Draft Level 1 Remedial Investigation Work Plan: 316-3 waste disposal trenches

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This work plan describes the work to be performed for the initial level of site characterization for the 316.3 Trenches at the Hanford Site. This initial site characterization effort will include a review of existing environmental contamination data for the 300 Area as well as collection and analysis of environmental samples to better characterize subsurface contamination at the site. 7 refs., 10 figs., 7 tabs.

  8. Project Management Plan (PMP) for Work Management Implementation

    Energy Technology Data Exchange (ETDEWEB)

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  9. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  10. 77 FR 67635 - Fiscal Year 2013 Draft Work Plan

    Science.gov (United States)

    2012-11-13

    ... with passage of the October 21, 1998 Denali Commission Act (Act) (Title III of Pub. L. 105-277, 42 U.S.C. 3121). The Act requires that the Commission develop proposed work plans for future spending and... Year 2013 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice. SUMMARY: The Denali...

  11. Work-Family Planning Attitudes among Emerging Adults

    Science.gov (United States)

    Basuil, Dynah A.; Casper, Wendy J.

    2012-01-01

    Using social learning theory as a framework, we explore two sets of antecedents to work and family role planning attitudes among emerging adults: their work-family balance self-efficacy and their perceptions of their parents' work-to-family conflict. A total of 187 college students completed a questionnaire concerning their work-family balance…

  12. Digface characterization test plan (remote testing)

    Energy Technology Data Exchange (ETDEWEB)

    Croft, K.; Hyde, R.; Allen, S.

    1993-08-01

    The objective of the Digface Characterization (DFC) Remote Testing project is to remotely deploy a sensor head (Mini-Lab) across a digface to determine if it can characterize the contents below the surface. The purpose of this project is to provide a robotics technology that allows removal of workers from hazards, increases speed of operations, and reduces life cycle costs compared to alternate methods and technologies. The Buried Waste Integrated Demonstration (BWID) is funding the demonstration, testing, and evaluation of DFC. This document describes the test plan for the DFC remote deployment demonstration for the BWID. The purposes of the test plan are to establish test parameters so that the demonstration results are deemed useful and usable and perform the demonstration in a safe manner and within all regulatory requirements.

  13. Digface characterization test plan (remote testing)

    International Nuclear Information System (INIS)

    The objective of the Digface Characterization (DFC) Remote Testing project is to remotely deploy a sensor head (Mini-Lab) across a digface to determine if it can characterize the contents below the surface. The purpose of this project is to provide a robotics technology that allows removal of workers from hazards, increases speed of operations, and reduces life cycle costs compared to alternate methods and technologies. The Buried Waste Integrated Demonstration (BWID) is funding the demonstration, testing, and evaluation of DFC. This document describes the test plan for the DFC remote deployment demonstration for the BWID. The purposes of the test plan are to establish test parameters so that the demonstration results are deemed useful and usable and perform the demonstration in a safe manner and within all regulatory requirements

  14. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  15. Work hazard prevention plans; Plan de prevencion de riesgos laborales

    Energy Technology Data Exchange (ETDEWEB)

    Albertos Campos, F.

    2009-07-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  16. How Medicare Prescription Drug Coverage Works with a Medicare Advantage Plan or Medicare Cost Plan

    Science.gov (United States)

    ... Medicare Prescription Drug Coverage Works with a Medicare Advantage Plan or Medicare Cost Plan Medicare offers prescription ... elect the drug coverage. 2. Join a Medicare Advantage Plan— like a Health Maintenance Organization (HMO), Preferred ...

  17. Characterization plan for TNX Burying Ground, Savannah River Plant

    International Nuclear Information System (INIS)

    The TNX Burying Ground, which is located within the TNX security fenceline, was originally built in 1953 for the disposal of waste and debris from an experimental evaporator explosion. The material buried contained approximately 590 kg of uranyl nitrate, with unspecified amounts of tin, conduit, timbers, and other debris. Partial removals were performed in the early 1980s when the waste was encountered during the construction of buildings and process structures at TNX. This Characterization Plan has been prepared to fulfill requirements outlined in the ''Scope of Work for Technical Assistance on Characterization of the TNX Burying Ground.'' This plan provides recommendations for collection of technical data to characterize the Savannah River Plant (SRP) TNX Burying Ground by identifying the numbers, types, depths, and locations of samples, the analyses to be performed, and the methodologies for collection

  18. Environmental education work force pipeline strategic plan

    Energy Technology Data Exchange (ETDEWEB)

    Ortega, S.U.; Jackson, E.R.

    1992-11-01

    This document describes an educational program designed to provide a pool of highly qualified administrative, technical, and managerial graduates that are familiar with the Hanford Site and business operations. The program is designed to provide work experience and mentoring to a culturally diverse student base which enhances affirmative employment goals. Short-term and long-term objectives of the program are outlined in the report, and current objectives are discussed in more detail. Goals to be completed by the year 2003 are aimed at defining the criteria necessary to establish partnerships between schools, community organizations, and human resources departments. Actions to be implemented includes providing instructors and equipment, enhancing skills of local teachers, and establishing collaboration with human resources organizations. Long-term goals of the program are to ensure a constant supply of qualified, trained workers to support industry missions. 6 refs., 1 tab.

  19. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    International Nuclear Information System (INIS)

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H ampersand S) plan, and a waste management plan

  20. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey, a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.

  1. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  2. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    1999-09-09

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

  3. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  4. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

  5. NWRS Region 5 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 5, Inventory and Monitoring Program IM outlines the implementation...

  6. Annual Habitat Work Plan, North Mississippi Refuges Complex 2006

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2006 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  7. Annual Habitat Work Plan, North Mississippi Refuges Complex 2010

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2010 on Dahomey, Tallhatchie, Coldwater River Refuges and the Henson FSA Tract of the North MS Refuge...

  8. Annual Habitat Work Plan, North Mississippi Refuges Complex 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2007 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  9. Annual Habitat Work Plan, North Mississippi Refuges Complex 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2004 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  10. Annual Habitat Work Plan, North Mississippi Refuges Complex 2008

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2008 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  11. Annual Habitat Work Plan, North Mississippi Refuges Complex 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2012 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  12. Annual Habitat Work Plan, North Mississippi Refuges Complex 2013

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2013 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  13. Annual Habitat Work Plan, North Mississippi Refuges Complex 2011

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2011 on Dahomey, Tallhatchie, Coldwater River Refuges and the Henson FSA Tract of the North MS Refuge...

  14. Annual Habitat Work Plan, North Mississippi Refuges Complex 2009

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2009 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  15. Region 3 Fiscal Year 2012 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 3 discusses the goals and objectives of the Inventory and Monitoring IM program for fiscal year 2012. The introduction includes the...

  16. Region 2 (Southwest Region) Fiscal Year 2012 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 2 discusses the goals and objectives of the Inventory and Monitoring IM program for fiscal year 2012. The introduction includes the...

  17. Region 5 Fiscal Year 2012 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 5 discusses the goals and objectives of the Inventory and Monitoring IM program for fiscal year 2012. The introduction includes the...

  18. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a plan that outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience. Wetland objectives...

  19. NWRS Region 6 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 6, Inventory and Monitoring Program (I present vision and...

  20. Annual Habitat Work Plan, North Mississippi Refuges Complex 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2005 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  1. NWRS Region 2 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 2, Inventory and Monitoring Program IM outlines the implementation...

  2. NWRS Region 3 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 3, Inventory and Monitoring Program IM outlines the implementation...

  3. NWRS Region 7 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 7, Inventory and Monitoring Program IM outlines the implementation...

  4. NWRS Region 4 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 4, Inventory and Monitoring Program IM outlines the implementation...

  5. NWRS Region 8 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  6. WIPP Facility Work Plan for Solid Waste Management Units

    International Nuclear Information System (INIS)

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A

  7. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  8. Transuranic waste characterization sampling and analysis plan

    International Nuclear Information System (INIS)

    Los Alamos National Laboratory (the Laboratory) is located approximately 25 miles northwest of Santa Fe, New Mexico, situated on the Pajarito Plateau. Technical Area 54 (TA-54), one of the Laboratory's many technical areas, is a radioactive and hazardous waste management and disposal area located within the Laboratory's boundaries. The purpose of this transuranic waste characterization, sampling, and analysis plan (CSAP) is to provide a methodology for identifying, characterizing, and sampling approximately 25,000 containers of transuranic waste stored at Pads 1, 2, and 4, Dome 48, and the Fiberglass Reinforced Plywood Box Dome at TA-54, Area G, of the Laboratory. Transuranic waste currently stored at Area G was generated primarily from research and development activities, processing and recovery operations, and decontamination and decommissioning projects. This document was created to facilitate compliance with several regulatory requirements and program drivers that are relevant to waste management at the Laboratory, including concerns of the New Mexico Environment Department

  9. Transuranic waste characterization sampling and analysis plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Los Alamos National Laboratory (the Laboratory) is located approximately 25 miles northwest of Santa Fe, New Mexico, situated on the Pajarito Plateau. Technical Area 54 (TA-54), one of the Laboratory`s many technical areas, is a radioactive and hazardous waste management and disposal area located within the Laboratory`s boundaries. The purpose of this transuranic waste characterization, sampling, and analysis plan (CSAP) is to provide a methodology for identifying, characterizing, and sampling approximately 25,000 containers of transuranic waste stored at Pads 1, 2, and 4, Dome 48, and the Fiberglass Reinforced Plywood Box Dome at TA-54, Area G, of the Laboratory. Transuranic waste currently stored at Area G was generated primarily from research and development activities, processing and recovery operations, and decontamination and decommissioning projects. This document was created to facilitate compliance with several regulatory requirements and program drivers that are relevant to waste management at the Laboratory, including concerns of the New Mexico Environment Department.

  10. Dose exposure work planning using DMU kinematics tools

    International Nuclear Information System (INIS)

    The study on the possibility of using DMU Kinematics module in CAE tools for dose exposure work planning was carried out. A case scenario was created using 3D CAD software and transferred to DMU Kinematics module in CAE software. A work plan was created using DMU Kinematics tools and animated to simulate a real time scenario. Data on the phantom position against the radioactive source was collected by activating positioning sensors in the module. The data was used to estimate dose rate exposure for the phantom. The results can be used to plan the safest and optimum procedures in carrying out the radiation related task. (author)

  11. Draft reclamation program plan for site characterization

    International Nuclear Information System (INIS)

    As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation's first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs

  12. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation......The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...

  13. Second ILAW Site Borehole Characterization Plan

    Energy Technology Data Exchange (ETDEWEB)

    SP Reidel

    2000-08-10

    The US Department of Energy's Hanford Site has the most diverse and largest amounts of radioactive tank waste in the US. High-level radioactive waste has been stored at Hanford since 1944. Approximately 209,000 m{sup 3} (54 Mgal) of waste are currently stored in 177 tanks. Vitrification and onsite disposal of low-activity tank waste (LAW) are embodied in the strategy described in the Tri-Party Agreement. The tank waste is to be retrieved, separated into low- and high-level fractions, and then immobilized. The low-activity vitrified waste will be disposed of in the 200 East Area of the Hanford Site. This report is a plan to drill and characterize the second borehole for the Performance Assessment. The first characterization borehole was drilled in 1998. The plan describes data collection activities for determining physical and chemical properties of the vadose zone and saturated zone on the northeast side of the proposed disposal site. These data will then be used in the 2005 Performance Assessment.

  14. Site characterization plan: Gulf Coast salt domes

    International Nuclear Information System (INIS)

    The National Waste Terminal Storage (NWTS) program of the US Department of Energy (DOE) is responsible for developing technology and providing facilities for safe, environmentally acceptable, permanent disposal of high-level nuclear waste. The Office of Nuclear Waste Isolation has been intensively investigating Gulf Coast Salt Dome Basin salt domes and bedded salt in Texas and Utah since 1978. In the Gulf Coast, the application of screening criteria in the region phase led to selection of eight domes for further study in the location phase. Further screening in the area phase identified four domes for more intensive study in the location phase: Oakwood Dome, Texas; Vacherie Dome, Louisiana; and Richton Dome and Cypress Creek Dome, Mississippi. For each dome, this Site Characterization Plan identifies specific hydrologic, geologic, tectonic, geochemical, and environmental key issues that are related to the DOE/NWTS screening criteria or affect the feasibility of constructing an exploratory shaft. The Site Characterization Plan outlines studies need to: (1) resolve issues sufficiently to allow one or more salt domes to be selected and compared to bedded salt sites in order to determine a prime salt site for an exploratory shaft; (2) conduct issue-related studies to provide a higher level of confidence that the preferred salt dome site is viable for construction of an exploratory shaft; and (3) provide a vehicle for state input to issues. Extensive references, 7 figures, 20 tables

  15. Second ILAW Site Borehole Characterization Plan

    International Nuclear Information System (INIS)

    The US Department of Energy's Hanford Site has the most diverse and largest amounts of radioactive tank waste in the US. High-level radioactive waste has been stored at Hanford since 1944. Approximately 209,000 m3 (54 Mgal) of waste are currently stored in 177 tanks. Vitrification and onsite disposal of low-activity tank waste (LAW) are embodied in the strategy described in the Tri-Party Agreement. The tank waste is to be retrieved, separated into low- and high-level fractions, and then immobilized. The low-activity vitrified waste will be disposed of in the 200 East Area of the Hanford Site. This report is a plan to drill and characterize the second borehole for the Performance Assessment. The first characterization borehole was drilled in 1998. The plan describes data collection activities for determining physical and chemical properties of the vadose zone and saturated zone on the northeast side of the proposed disposal site. These data will then be used in the 2005 Performance Assessment

  16. Tank 241-AW-101 tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Sathyanarayana, P.

    1994-11-22

    The first section gives a summary of the available information for Tank AW-101. Included in the discussion are the process history and recent sampling events for the tank, as well as general information about the tank such as its age and the risers to be used for sampling. Tank 241-AW-101 is one of the 25 tanks on the Flammable Gas Watch List. To resolve the Flammable Gas safety issue, characterization of the tanks, including intrusive tank sampling, must be performed. Prior to sampling, however, the potential for the following scenarios must be evaluated: the potential for ignition of flammable gases such as hydrogen-air and/or hydrogen-nitrous oxide; and the potential for secondary ignition of organic-nitrate/nitrate mixtures in crust layer initiated by the burning of flammable gases or by a mechanical in-tank energy source. The characterization effort applicable to this Tank Characterization Plan is focused on the resolution of the crust burn flammable gas safety issue of Tank AW-101. To evaluate the potential for a crust burn of the waste material, calorimetry tests will be performed on the waste. Differential Scanning Calorimetry (DSC) will be used to determine whether an exothermic reaction exists.

  17. Tank 241-AW-101 tank characterization plan

    International Nuclear Information System (INIS)

    The first section gives a summary of the available information for Tank AW-101. Included in the discussion are the process history and recent sampling events for the tank, as well as general information about the tank such as its age and the risers to be used for sampling. Tank 241-AW-101 is one of the 25 tanks on the Flammable Gas Watch List. To resolve the Flammable Gas safety issue, characterization of the tanks, including intrusive tank sampling, must be performed. Prior to sampling, however, the potential for the following scenarios must be evaluated: the potential for ignition of flammable gases such as hydrogen-air and/or hydrogen-nitrous oxide; and the potential for secondary ignition of organic-nitrate/nitrate mixtures in crust layer initiated by the burning of flammable gases or by a mechanical in-tank energy source. The characterization effort applicable to this Tank Characterization Plan is focused on the resolution of the crust burn flammable gas safety issue of Tank AW-101. To evaluate the potential for a crust burn of the waste material, calorimetry tests will be performed on the waste. Differential Scanning Calorimetry (DSC) will be used to determine whether an exothermic reaction exists

  18. Sandia SWiFT Site Safe Work Planning Manual.

    Energy Technology Data Exchange (ETDEWEB)

    White, Jonathan

    2016-02-01

    The Department of Energy's Scaled Wind Farm Technology (SWiFT) facility provides research site with multiple wind turbines at a scale useful for the experimental study of wake dynamics, advanced rotor development, turbine control, and advanced sensing for production-scale wind farms. Safety of workers and the public is the top and overriding priority at SWiFT. Central to safe operations are formal planning processes . This manual provides an overview of test planning and work planning processes and requirements in adherence with the Sandia corporate Engineered Safety Work Planning and Control process. It is required reading for all SWiFT site staff, Sandia workers, and collaborators who oversee, conduct, or participate in test activities or who are involved in modifying Sandia SWiFT site assets.

  19. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  20. Advance care planning in South Korea: Social work perspective.

    Science.gov (United States)

    Kwon, Sung Ae; Kolomer, Stacey

    2016-08-01

    As ethical issues arise concerning the continuation of futile medical treatment for dying patients in Korean society, advance directive planning initiatives have been put into place to guide practice. This article describes the awareness and attitudes of social workers in Korea regarding advance care planning and related factors. A total of 246 gerontological/geriatric social workers completed a mailed or in-person survey regarding awareness and attitudes toward advance care planning. Seventy-three percent (n = 180) of the participants reported no knowledge of advance directives. Social workers who emphasized self-determination as a professional value, professed a preference for hospice care, and who were comfortable discussing death were more likely to have a positive attitudes toward advance care planning. This study reinforces the need for the infusion of advance care planning and end-of-life training in social work education in Korea. PMID:27428654

  1. Information System Model of A Work-Plan Budget

    OpenAIRE

    Bens Pardamean; Hutanti Setyodewi

    2014-01-01

    As a form of accountability in carrying out its duties, functions, and authority, a government agency must prepare a budget and work plan. The budgeting process in many government agencies utilizes manual processes with various documents, resulting in long processing time, numerous errors, and difficulty in data searching. Furthermore, the lack of data integration interferes with the need to meet requirements, standards, and budget-planning deadlines. The research methods were conducted throu...

  2. Characterization plan for Hanford spent nuclear fuel

    International Nuclear Information System (INIS)

    Reprocessing of spent nuclear fuel (SNF) at the Hanford Site Plutonium-Uranium Extraction Plant (PUREX) was terminated in 1972. Since that time a significant quantity of N Reactor and Single-Pass Reactor SNF has been stored in the 100 Area K-East (KE) and K-West (KW) reactor basins. Approximately 80% of all US Department of Energy (DOE)-owned SNF resides at Hanford, the largest portion of which is in the water-filled KE and KW reactor basins. The basins were not designed for long-term storage of the SNF and it has become a priority to move the SNF to a more suitable location. As part of the project plan, SNF inventories will be chemically and physically characterized to provide information that will be used to resolve safety and technical issues for development of an environmentally benign and efficient extended interim storage and final disposition strategy for this defense production-reactor SNF

  3. Corrective measures evaluation work plan Technical Area V groundwater.

    Energy Technology Data Exchange (ETDEWEB)

    Lebow, Patrick S.; Dettmers, Dana L.; Hall, Kevin A.

    2004-04-01

    This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, identifies and outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories New Mexico Technical Area (TA)-V Groundwater. The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for the TA-V Groundwater. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of the corrective measures process.

  4. Corrective measures evaluation work plan : Tijeras Arroyo Groundwater : revision 0.

    Energy Technology Data Exchange (ETDEWEB)

    Wymore, Ryan A.; Collins, Sue S.; Skelly, Michael Francis; Koelsch, Michael C.

    2004-12-01

    This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories Tijeras Arroyo Groundwater (TAG). The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for TAG. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of the corrective measures process.

  5. 10 CFR 60.16 - Site characterization plan required.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Site characterization plan required. 60.16 Section 60.16... REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding to sink shafts at any area which has been approved by the President for site characterization, DOE...

  6. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  7. Work plan addendum for the remedial investigation and feasibility study of the Salmon Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

  8. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  9. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    Energy Technology Data Exchange (ETDEWEB)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-12-31

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

  10. Improving work efficiency in Traffic Planning : Finnair Plc

    OpenAIRE

    Tonteri, Antti

    2015-01-01

    The purpose of the present thesis was to find out the most important improvement areas in the work of Traffic Planning team, which is part of Resource Management department at Finnair Plc. Finnair is a Finnish commercial airline focusing on the traffic between Europe and Asia. The team members have reported dissatisfaction about the working environment especially during the last two years. The objective of this this study was to identify the main problem areas and find solution(s) to improve ...

  11. Operating planning of local work at railway polygon

    OpenAIRE

    Каньовська, Дарина Василівна

    2012-01-01

    Basic factors of effective rail freight traffic volume management on the railway have been shown. The task of minimization of expanses which are caused by the empty cars run at operational planning of local work organization on polygon have been set

  12. Technical Support Section annual work plan for FY 1997

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Allison, K.L.; Effler, R.P.; Hess, R.A.; Keeble, T.A.; Odom, S.M.; Smelcer, D.R.

    1996-10-01

    The Technical Support Section (TSS) of the Instrumentation and Controls (I&C) Division of Oak Ridge National Laboratory (ORNL) provides technical services such as fabrication, modification, installation, calibration, operation, repair, and preventive maintenance of instruments and other related equipment. Work performed by TSS is in support of basic and applied research and development (R&D), engineering, and instrument and computer systems managed by ORNL. Because the activities and priorities of TSS must be adapted to the technical support needs of ORNL, the TSS Annual Work Plan is derived from, and driven directly by, current trends in the budgets and activities of each ORNL division for which TSS provides support such as reductions in the staffing levels. TSS does not have an annual budget to cover operating expenses incurred in providing instrument maintenance support to ORNL. Each year, TSS contacts ORNL division finance managers or division finance officers to obtain information concerning projected funding levels of programs and facilities they manage. TSS workforce and resource projections are based on the information obtained and are weighted depending on the percentage of support provided to that division or program. The Long- Range Work Plan is based on estimates of impact of the long-range priorities and directions of the Laboratory. Identifiable proposed new facilities and programs provide additional basis for long-range planning. After identifying long-range initiatives, TSS planning includes future training requirements, re-evaluation of qualifications for new hires, and identification of essential test equipment needed in new work.

  13. Tank 241-B-101 tank characterization plan

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D. [Westinghouse Hanford Co., Richland, WA (United States)

    1995-04-28

    The Defense Nuclear Facilities Safety Board (DNFSB) has advised the US Department of Energy (DOE) to concentrate the near-term sampling and analysis activities on identification and resolution of safety issues (Conway 1993). The data quality objective (DQO) process was chosen as a tool to be used to identify the sampling and analytical needs for the resolution of safety issues. As a result, a revision in the Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) milestone M-44 has been made, which states that ``A Tank Characterization Plan (TCP) will be developed for each double-shell tank (DST) and single-shell tank (SST) using the DQO process``. This document satisfies that requirement for tank 241-B-101 (B-101) sampling activities. Tank B-101 is identified as a low-heat load non-Watch List tank, and is classified as an assumed leaker. The tank is passively ventilated, interim stabilized, and intrusion prevention measures have been completed. As of January 31, 1995, approximately 428,000 liters of non-complexed waste was contained in the tank. Tank B-101 is expected to have two primary layers. A layer of saltcake waste generated from the 242-B evaporator, followed by a top layer of sludge composed of B-Plant high-level, B-Plant low-level, and unknown waste.

  14. Tank 241-B-103 tank characterization plan

    International Nuclear Information System (INIS)

    The Defense Nuclear Facilities Safety Board (DNFSB) has advised the US Department of Energy (DOE) to concentrate the near-term sampling and analysis activities on identification and resolution of safety issues. The data quality objective (DQO) process was chosen as a tool to be used to identify sampling and analytical needs for the resolution of safety issues. As a result, a revision in the Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA) milestone M-44-00 has been made, which states that ''A Tank Characterization Plan (TCP) will also be developed for each double-shell tank (DST) and single-shell tank (SST) using the DQO process... Development of TCPs by the DQO process is intended to allow users (e.g., Hanford Facility user groups, regulators) to ensure their needs will be met and that resources are devoted to gaining only necessary information.'' This document satisfies that requirement for Tank 241-B-103 (B-103) sampling activities. Tank B-103 was placed on the Organic Watch List in January 1991 due to review of TRAC data that predicts a TOC content of 3.3 dry weight percent. The tank was classified as an assumed leaker of approximately 30,280 liters (8,000 gallons) in 1978 and declared inactive. Tank B-103 is passively ventilated with interim stabilization and intrusion prevention measures completed in 1985

  15. Tank 244A tank characterization plan

    International Nuclear Information System (INIS)

    The Double-Shell Tank (DST) System currently receives waste from the Single-Shell Tank (SST) System in support of SST stabilization efforts or from other on-site facilities which generate or store waste. Waste is also transferred between individual DSTs. The mixing or commingling of potentially incompatible waste types at the Hanford Site must be addressed prior to any waste transfers into the DSTs. The primary goal of the Waste Compatibility Program is to prevent the formation of an Unreviewed Safety Question (USQ) as a result of improper waste management. Tank 244A is a Double Contained Receiver Tank (DCRT) which serves as any overflow tank for the East Area Farms. Waste material is able to flow freely between the underground storage tanks and tank 244A. Therefore, it is necessary to test the waste in tank 244A for compatibility purposes. Two issues related to the overall problem of waste compatibility must be evaluated: Assurance of continued operability during waste transfer and waste concentration and Assurance that safety problems are not created as a result of commingling wastes under interim storage. The results of the grab sampling activity prescribed by this Tank Characterization Plan shall help determine the potential for four kinds of safety problems: criticality, flammable gas accumulation, energetics, and corrosion and leakage

  16. Tank waste remediation system multi-year work plan

    International Nuclear Information System (INIS)

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging open-quotes out sourcingclose quotes of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders

  17. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  18. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  19. Half-liter supernatant sampler system engineering work plan

    Energy Technology Data Exchange (ETDEWEB)

    Ritter, G.A.

    1995-06-06

    The Tank Waste Remediation System (TWRS) pretreatment facility project W-236B, known as the Initial Pretreatment Module (IPM), requires samples of supernatants and sludges from 200 Area tank farms for planned hot testing work in support of IPM design. The IPM project has proposed the development of several new sampler systems. These systems include a 0.5-l supernatant sampler, 3-l and 25-l supernatant and sludge samplers, and a 4,000-l sampler system. The 0.5-l sampler will support IPM sampling needs in the 1 to 3 l range starting in late fiscal year 1995. This sampler is intended to be used in conjunction with the existing 100 ml bottle-on-a-string. The 3-l and 25-l systems will be based on the Savannah River Site`s sampler system and will support IPM sampling needs in the 3 to 100 liter range. Most of the hot testing required for design of the IPM must be accomplished in the next 3 years. This work plan defines the tasks associated with the development of a 0.5-l sampler system. This system will be referred to as the Half-Liter Supernatant Sampler System (HLSSS). Specifically, this work plan will define the scope of work, identify organizational responsibilities, identify major technical requirements, describe configuration control and verification requirements, and provide estimated costs and schedule. The sampler system will be fully operational, including trained staff and operating procedures, upon completion of this task.

  20. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  1. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    This characterization plan has been developed as part of the U.S. Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  2. Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  3. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-02-14

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  4. What Works Scotland & West Dunbartonshire Community Planning Partnership – Community-Led Action Planning Report

    OpenAIRE

    Bynner, Claire

    2015-01-01

    At the heart of the What Works Scotland initiative is a programme of Collaborative Action Research (CAR) that is being taken forward with representatives from four case study Community Planning Partnerships (CPPs). The aim of this work is to build capacity and capability in the use of evidence to support local improvement projects and to capture evidence from practice as to what works in achieving public service reform. West Dunbartonshire is one of four WWS national case study...

  5. Tank 241-AZ-101 tank characterization plan

    International Nuclear Information System (INIS)

    The Defense Nuclear Facilities Safety Board has advised the DOE to concentrate the near-term sampling and analysis activities on identification and resolution of safety issues. The Data Quality Objective (DQO) process was chosen as a tool to be used in the resolution of safety issues. As a result, A revision in the Federal Facilities Agreement and Consent Order (Tri-Party Agreement) milestone M-44 has been made, which states that ''A Tank Characterization Plan (TCP) will also be developed for each double-shell tank (DST) and single-shell tank (SST) using the DQO process. Development of TCPs by the DQO process is intended to allow users to ensure their needs will be met and that resources are devoted to gaining only necessary information''. This document satisfies that requirement for Tank 241-AZ-101 (AZ-101) sampling activities. Tank AZ-101 is currently a non-Watch List tank, so the only DQOs applicable to this tank are the safety screening DQO and the compatibility DQO, as described below. The contents of Tank AZ-101, as of October 31, 1994, consisted of 3,630 kL (960 kgal) of dilute non-complexed waste and aging waste from PUREX (NCAW, neutralized current acid waste). Tank AZ-101 is expected to have two primary layers. The bottom layer is composed of 132 kL of sludge, and the top layer is composed of 3,500 kL of supernatant, with a total tank waste depth of approximately 8.87 meters

  6. Tank 241-AZ-102 tank characterization plan

    International Nuclear Information System (INIS)

    The Defense Nuclear Facilities Safety Board has advised the DOE to concentrate the near-term sampling and analysis activities on identification and resolution of safety issues. The Data Quality Objective (DQO) process was chosen as a tool to be used in the resolution of safety issues. As a result, a revision in the Federal Facilities Agreement and Consent Order (Tri-Party Agreement) milestone M-44 has been made, which states that ''A Tank Characterization Plan (TCP) will also be developed for each double-shell tank (DST) and single-shell tank (SST) using the DQO process ... Development of TCPs by the DQO process is intended to allow users to ensure their needs will be met and that resources are devoted to gaining only necessary information''. This document satisfies that requirement for tank 241-AZ-102 (AZ-102) sampling activities. Tank AZ-102 is currently a non-Watch List tank, so the only DQOs applicable to this tank are the safety screening DQO and the compatibility DQO, as described below. The current contents of Tank AZ-102, as of October 31, 1994, consisted of 3,600 kL (950 kgal) of dilute non-complexed waste and aging waste from PUREX (NCAW, neutralized current acid waste). Tank AZ-102 is expected to have two primary layers. The bottom layer is composed of 360 kL of sludge, and the top layer is composed of 3,240 kL of supernatant, with a total tank waste depth of approximately 8.9 meters

  7. IMPROVEMENT PLANNING WORK OF RAILWAYS IN EMPOWERMENT LOGISTICS METHOD

    OpenAIRE

    Shevcheko, A.

    2014-01-01

    The article considers the problems of rail transport. The necessity of use of the latest techniques in planning logistics operative work rail. The necessity of intensive use and modernize the existing information systems creation of new software systems to carry out operations on processing of goods to satisfy customers' needs. Considered shippers requirements that must be performed to improve the profitability of the railway and the competitive attractiveness of rail transport. Considered do...

  8. Planning and Evaluating Educational Work in Slovene Preschools

    Directory of Open Access Journals (Sweden)

    Marcela Batistič Zorec

    2012-01-01

    Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.

  9. Work plan, AP-102 mixer pump removal and pump replacement

    International Nuclear Information System (INIS)

    The objective of this work plan is to plan the steps and estimate the costs required to remove the failed AP-102 mixer pump, and to plan and estimate the cost of the necessary design and specification work required to order a new, but modified, mixer pump including the pump and pump pit energy absorbing design. The main hardware required for the removal of the mixer is as follows: a flexible receiver and blast shield; a metal container for the pulled mixer pump; and a trailer and strongback to haul and manipulate the container. Additionally: a gamma scanning device will be needed to detect the radioactivity emanating from the mixer as it is pulled from the tank; a water spray system will be required to remove tank waste from the surface of the mixer as it is pulled from the AP-102 tank; and a lifting yoke to lift the mixer from the pump pit (the SY-101 Mixer Lifting Yoke will be used). A ''green house'' will have to be erected over the AP-102 pump pit and an experienced Hoisting and Rigging crew must be assembled and trained in mixer pump removal methods before the actual removal is undertaken

  10. Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This standard guide applies to developing nuclear facility characterization plans to define the type, magnitude, location, and extent of radiological and chemical contamination within the facility to allow decommissioning planning. This guide amplifies guidance regarding facility characterization indicated in ASTM Standard E 1281 on Nuclear Facility Decommissioning Plans. This guide does not address the methodology necessary to release a facility or site for unconditional use. This guide specifically addresses: 1.1.1 the data quality objective for characterization as an initial step in decommissioning planning. 1.1.2 sampling methods, 1.1.3 the logic involved (statistical design) to ensure adequate characterization for decommissioning purposes; and 1.1.4 essential documentation of the characterization information. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate saf...

  11. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  12. A plan of radiation work market on the web

    International Nuclear Information System (INIS)

    In Japan there are many kinds of radiation facilities, and a great number of radiation employees are engaged in plant repairing. It is therefore, very important to strive for employee controls, radiation controls, health examinations and data control. Furthermore, it is necessary to establish a total data management system that processes numerous amounts of data concerning radiation employees. The present paper proposes the establishment of a radiation work market on the web using a total data management system. The system will include radiation employee control information service for members who are planning new employment contracts. (author)

  13. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  14. Action Planning Mediates Guidance of Visual Attention from Working Memory

    Directory of Open Access Journals (Sweden)

    Tobias Feldmann-Wüstefeld

    2015-01-01

    Full Text Available Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles, thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences.

  15. Action Planning Mediates Guidance of Visual Attention from Working Memory.

    Science.gov (United States)

    Feldmann-Wüstefeld, Tobias; Schubö, Anna

    2015-01-01

    Visual search is impaired when a salient task-irrelevant stimulus is presented together with the target. Recent research has shown that this attentional capture effect is enhanced when the salient stimulus matches working memory (WM) content, arguing in favor of attention guidance from WM. Visual attention was also shown to be closely coupled with action planning. Preparing a movement renders action-relevant perceptual dimensions more salient and thus increases search efficiency for stimuli sharing that dimension. The present study aimed at revealing common underlying mechanisms for selective attention, WM, and action planning. Participants both prepared a specific movement (grasping or pointing) and memorized a color hue. Before the movement was executed towards an object of the memorized color, a visual search task (additional singleton) was performed. Results showed that distraction from target was more pronounced when the additional singleton had a memorized color. This WM-guided attention deployment was more pronounced when participants prepared a grasping movement. We argue that preparing a grasping movement mediates attention guidance from WM content by enhancing representations of memory content that matches the distractor shape (i.e., circles), thus encouraging attentional capture by circle distractors of the memorized color. We conclude that templates for visual search, action planning, and WM compete for resources and thus cause interferences. PMID:26171241

  16. Scope and purpose of the preliminary planning work

    International Nuclear Information System (INIS)

    The results of preliminary planning work are usually expressed in a number of recommendations covering mainly: long-term national policy in the field of energy resources and selection of projects to be further studied at the feasibility level. Moreover, recommendations on further actions are made including: inventory of generation and transmission facilities recommended for the implementation in order to meet the load forecasted for medium-term period, preparation of a preliminary calender of decisions to be taken for the implementation of the projects recommended, preparation of a preliminary construction schedule, preparation of a preliminary investment program, preparation of a program of necessary engineering works, and performance of study on electricity rates which would adjust existing tariffs to proposed development program of the utility. (HP)

  17. Environmental Regulatory Compliance Plan for Site Characterization

    International Nuclear Information System (INIS)

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with applicable environmental statutes and regulations. These objectives are described in DOE Order 5400.1 (Environmental Protection Program Requirements). This document -- the Environmental Regulatory Compliance Plan (ERCP) -- is one method of implementing the policy set forth in DOE Order 5400.1 and the NWPA. The ERCP describes the plan by which the DOE will comply with applicable Federal environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statutes and regulations. 180 refs., 27 figs., 1 tab

  18. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  19. Transuranic Waste Characterization Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes

  20. Tank 241-BY-103 Tank Characterization Plan. Revision 1

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations and WHC 222-S Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples for tank 241-BY-103

  1. Tank 241-C-101: Tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the characterization program, sampling operations, and WHC 222-S Laboratory. Scope of this plan is to provide guidance for sampling and analysis of samples for tank 241-C-101. The sampling type has been changed from push mode core sampling to auger sampling

  2. Tank 241-C-101: Tank characterization plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Schreiber, R.D.

    1995-03-08

    This document is a plan which serves as the contractual agreement between the characterization program, sampling operations, and WHC 222-S Laboratory. Scope of this plan is to provide guidance for sampling and analysis of samples for tank 241-C-101. The sampling type has been changed from push mode core sampling to auger sampling.

  3. Tank 241-C-103 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    This document is a plan which serves as the contractual agreement between the Characterization Program, Sampling Operations, WHC 222-S Laboratory, and PNL 325 Analytical Chemistry Laboratory. The scope of this plan is to provide guidance for the sampling and analysis of samples from tank 241-C-103

  4. Characterization plan for the Hanford Generating Plant (HGP)

    International Nuclear Information System (INIS)

    This characterization plan describes the sample collection and sample analysis activities to characterize the Hanford Generating Plant and associated solid waste management units (SWMUs). The analytical data will be used to identify the radiological contamination in the Hanford Generating Plant as well as the presence of radiological and hazardous materials in the SWMUs to support further estimates of decontamination interpretation for demolition

  5. Characterization plan for the 108-F Biological Laboratory

    International Nuclear Information System (INIS)

    This characterization plan describes the sample collection and sample analysis activities to characterize the 108-F Biological Laboratory, which is located at the Hanford Site in Richland, Washington. The analytical data will be used to identify the radiological contamination and presence of hazardous materials to support disposal of the demolition debris

  6. Characterization plan for the 331-A Virology Laboratory Building

    International Nuclear Information System (INIS)

    This characterization plan presents the rationale and strategy for the sampling and analysis activities proposed in support of the demolition of the 331-A Virology Laboratory Building. The purpose of the sampling and analysis is to characterize the building structure to support disposing the building demolition debris in the Environmental Remediation Disposal Facility

  7. Final work plan : investigation of potential contamination at the former USDA facility in Ramona, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.

  8. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  9. Technical Work Plan for: Thermodynamic Database for Chemical Modeling

    Energy Technology Data Exchange (ETDEWEB)

    C.F. Jovecolon

    2006-09-07

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parameter values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species.

  10. Technical Work Plan for: Thermodynamic Databases for Chemical Modeling

    International Nuclear Information System (INIS)

    The objective of the work scope covered by this Technical Work Plan (TWP) is to correct and improve the Yucca Mountain Project (YMP) thermodynamic databases, to update their documentation, and to ensure reasonable consistency among them. In addition, the work scope will continue to generate database revisions, which are organized and named so as to be transparent to internal and external users and reviewers. Regarding consistency among databases, it is noted that aqueous speciation and mineral solubility data for a given system may differ according to how solubility was determined, and the method used for subsequent retrieval of thermodynamic parameter values from measured data. Of particular concern are the details of the determination of ''infinite dilution'' constants, which involve the use of specific methods for activity coefficient corrections. That is, equilibrium constants developed for a given system for one set of conditions may not be consistent with constants developed for other conditions, depending on the species considered in the chemical reactions and the methods used in the reported studies. Hence, there will be some differences (for example in log K values) between the Pitzer and ''B-dot'' database parameters for the same reactions or species

  11. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  12. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    International Nuclear Information System (INIS)

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site

  13. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

  14. Tank farm waste characterization Technology Program Plan

    International Nuclear Information System (INIS)

    This document presents technological and analytical methods development activities required to characterize, process, and dispose of Hanford Site wastes stored in underground waste tanks in accordance with state and federal environmental regulations. The document also lists the need date, current (fiscal year 1989) funding, and estimate of future funding for each task. Also identified are the impact(s) if an activity is not completed. The document integrates these needs to minimize duplication of effort between the various programs involved

  15. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  16. Single-shell tank closure work plan. Revision A

    International Nuclear Information System (INIS)

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs

  17. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  18. A working plan for working group 2 'enrichment' within the scope of INFCE

    International Nuclear Information System (INIS)

    A working plan for INFCE/WG.2 is presented, outlining the major questions which the group needs to answer under the headings: 1. Enrichment needs and supply, 2. Models for cross-investment, 3. Market situation, 4. Technical and economic assessment of the different enrichment technologies, and 5. Safeguards aspects. It is suggested that the group's assessment should include: 1. Future enrichment capacities, 2. Multinational or regional fuel cycle centres, 3. Possible patterns for guarantees of supply, and 4. Special needs of developing countries

  19. Tank 241-C-103 tank characterization plan

    International Nuclear Information System (INIS)

    The data quality objective (DQO) process was chosen as a tool to be used to identify the sampling analytical needs for the resolution of safety issues. A Tank Characterization Plant (TCP) will be developed for each double shell tank (DST) and single-shell tank (SST) using the DQO process. There are four Watch list tank classifications (ferrocyanide, organic salts, hydrogen/flammable gas, and high heat load). These classifications cover the six safety issues related to public and worker health that have been associated with the Hanford Site underground storage tanks. These safety issues are as follows: ferrocyanide, flammable gas, organic, criticality, high heat, and vapor safety issues. Tank C-103 is one of the twenty tanks currently on the Organic Salts Watch List. This TCP will identify characterization objectives pertaining to sample collection, hot cell sample isolation, and laboratory analytical evaluation and reporting requirements in accordance with the appropriate DQO documents. In addition, the current contents and status of the tank are projected from historical information. The relevant safety issues that are of concern for tanks on the Organic Salts Watch List are: the potential for an exothermic reaction occurring from the flammable mixture of organic materials and nitrate/nitrite salts that could result in a release of radioactive material and the possibility that other safety issues may exist for the tank

  20. Characterization Program Management Plan for Hanford K Basin Spent Nuclear Fuel (SNF) (OCRWM)

    International Nuclear Information System (INIS)

    The management plan developed to characterize the K Basin spent nuclear fuel (SNF) and sludge was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the SNF stored at the Hanford K Basins. The plan also addressed necessary characterization for the removal, transport, and storage of the sludge from the Hanford K Basins. This plan was revised in 1999 (i.e., Revision 2) to incorporate actions necessary to respond to the deficiencies revealed as the result of Quality Assurance surveillances and audits in 1999 with respect to the fuel characterization activities. Revision 3 to this Program Management Plan responds to a Worker Assessment resolution determined in Fical Year 2000. This revision includes an update to current organizational structures and other revisions needed to keep this management plan consistent with the current project scope. The plan continues to address both the SNF and the sludge accumulated at K Basins. Most activities for the characterization of the SNF have been completed. Data validation, Office of Civilian Radioactive Waste Management (OCRWM) document reviews, and OCRWM data qualification are the remaining SNF characterization activities. The transport and storage of K Basin sludge are affected by recent path forward revisions. These revisions require additional laboratory analyses of the sludge to complete the acquisition of required supporting engineering data. Hence, this revision of the management plan provides the overall work control for these remaining SNF and sludge characterization activities given the current organizational structure of the SNF Project

  1. Interim measure work plan/design for Agra, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  2. Will a Quota Plan for Asylum Seekers Plan Work —and Why Not?

    DEFF Research Database (Denmark)

    Seeberg, Peter

    The article describes the recent situation in the Mediterranean, where the number of asylum seekers arriving from countries south and east of the Mediterranean Sea is increasing significantly. The European Commission has suggested a plan, “A European Agenda on Migration”, which will redistribute...... idea from the EU-Commission of a mandatory quota plan for asylum seekers will not work, because too many states will pretend, that the problem does not really belong to them. They fear that accepting a system according to which each state has to accept a fixed quota of asylum seekers in a recent...... context might later on lead to a common EU migra-tion policy, which are beyond national control and would make it difficult to avoid responsibilities for internal crisis situations emerging in other parts of the Middle East or North Africa in the future....

  3. 2005 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River Refuge is currently developing a Habitat Management Plan, and expects a draft HMP by summer of 2006. The Refuge finalized a master plan in 1986;...

  4. 75 FR 7256 - Denali Commission Fiscal Year 2010 Draft Work Plan

    Science.gov (United States)

    2010-02-18

    ...). The Denali Commission Act requires that the Commission develop proposed work plans for future spending... Commission Fiscal Year 2010 Draft Work Plan AGENCY: Denali Commission. ACTION: Denali Commission Fiscal Year 2010 Draft Work Plan request for comments. SUMMARY: The Denali Commission (Commission) is...

  5. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction work plans-distribution borrowers. 1710... LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.251 Construction work plans..., including the related costs of installation, is limited to capital equipment designed to influence the...

  6. TWRS phase I privatization site environmental baseline and characterization plan

    International Nuclear Information System (INIS)

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan

  7. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  8. Final work plan for targeted investigation at Hilton, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  9. Plans for characterization of salt sites in the United States of America

    International Nuclear Information System (INIS)

    The characterization plans presented in this paper are considered to be basic in nature and are the minimum program that meets project needs. The proposed basic program can be applied to any of the salt sites under consideration. It has been designed to provide the data required to support the design, performance assessment, and licensing of each of the principal project elements: the repository, the shafts, and the surface facilities. The work has been sequenced to meet the design and licensing schedule. It is anticipated that additional characterization activities will be performed to address site-specific considerations and to provide additional information to address questions which arise during the evaluation of characterization data. The information obtained during the characterization program will be incorporated into: the site characterization plan, the site recommendation report, the environmental impact statement, and the construction authorization application

  10. Work plan for defining a standard inventory estimate for wastes stored in Hanford Site underground tanks

    International Nuclear Information System (INIS)

    This work plan addresses the Standard Inventory task scope, deliverables, budget, and schedule for fiscal year 1997. The goal of the Standard Inventory task is to resolve differences among the many reported Hanford Site tank waste inventory values and to provide inventory estimates that will serve as Standard Inventory values for all waste management and disposal activities. These best-basis estimates of chemicals and radionuclides will be reported on both a global and tank-specific basis and will be published in the Tank Characterization Database

  11. Annual Habitat Work Plan Seatuck National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines management activities that include forest protection, grassland management, wetland restoration, wildlife nesting structures, invasive vegetation...

  12. JOYO MK-III modification work on heat transport system. Working plan and plant control

    International Nuclear Information System (INIS)

    The MK-III project to improve the irradiation capability of the experimental fast reactor JOYO have been in underway since 1987. The increase of fast neutron flux and the enlargement of that field increase the reactor thermal rate from 100 MWt to 140 MWt. To increase cooling capacity of heat transport system, intermediate heat exchangers (IHXs), dump heat exchangers (DHXs), piping connecting to IHXs and DHXs, main motors on primary and secondary main circulation pumps were replaced. The replacement of these large components was carried out under following hard conditions. 1) Limitation of work space, 2) Fuel subassembly and molten sodium in the reactor vessel, 3) high radiation circumstances for primary cooling system, 4) treatment of radioactive sodium (radioactive sodium and corrosion product such as 60Co, 54Mn). There are little experiences of this kind of work in the world. Therefore the organization, working plan and safety management points were carefully examined and established, based on the previous experience of JOYO operation and maintenance, research and development results of safety treatment of sodium, experience of previous work on sodium facilities. Followings results were obtained and effectiveness was confirmed in the work. (1) Development of most suitable working plan derived from elements and full size mock up experiments, reduction of exposure time by workers training, reduction of radiation dose by installation of temporal radiation shielding were useful to reduce radiation dose. The usage of seal bag was useful to prevent the contamination spreading over. (2) The usage of seal bag, oxygen concentration monitoring in the seal bag, nitrogen concentration monitoring in the cooling system cover gas, low pressure control of cover gas were useful to reduce the inflow of oxygen to cooling system. (3) The bite cutting method for piping in air and press down cutting by roller cutter in the seal bag to prevent inflow of cutting piece, stopper insertion

  13. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    International Nuclear Information System (INIS)

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility

  14. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  15. 324 Building life cycle dose estimates for planned work

    International Nuclear Information System (INIS)

    This report describes a tool for use by organizational management teams to plan, manage, and oversee personnel exposures within their organizations. The report encompasses personnel radiation exposures received from activities associated with the B-Cell Cleanout Project, Surveillance and Maintenance Project, the Mk-42 Project, and other minor activities. It is designed to provide verifiable Radiological Performance Reports. The primary area workers receive radiation exposure is the Radiochemical Engineering Complex airlock. Entry to the airlock is necessary for maintenance of cranes and other equipment, and to set up the rail system used to move large pieces of equipment and shipping casks into and out of the airlock. Transfers of equipment and materials from the hot cells in the complex to the airlock are required to allow dose profiles of waste containers, shuffling of waste containers to allow grouting activities to go on, and to allow maintenance of in-cell cranes. Both DOE and the Pacific Northwest Laboratory (PNL) are currently investing in state-of-the-art decontamination equipment. Challenging goals for exposure reduction were established for several broad areas of activity. Exposure estimates and goals developed from these scheduled activities will be compared against actual exposures for scheduled and unscheduled activities that contributed to exposures received by personnel throughout the year. Included in this report are life cycle exposure estimates by calendar year for the B-Cell Cleanout project, a three-year estimate of exposures associated with Surveillance and Maintenance, and known activities for Calendar Year (CY) 1995 associated with several smaller projects. These reports are intended to provide a foundation for future dose estimates, by year, requiring updating as exposure conditions change or new avenues of approach to performing work are developed

  16. Final work plan for targeted investigation at Inman, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-11-05

    In 1997, low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5 {micro}g/L) were detected in groundwater at Inman, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1997 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Inman from 1954 to 1965. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Inman is located in southwest McPherson County, approximately 10 mi southwest of the city of McPherson (Figure 1.1). To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation at Inman, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. For this work plan, Argonne compiled historical data related to the previous investigations and grain storage operations at Inman. Through a review of documents acquired from all available sources, other potential contaminant source areas (in addition to the former CCC/USDA facility) have been identified as (1) the commercial grain storage structures northwest of Inman, along the railroad right-of-way, and (2) small former private grain storage facilities west of Main Street and near the former CCC/USDA facility at the southern edge of Inman (Figure 1.2). Previous investigations and the potential source areas are discussed in Section 2.

  17. Socioeconomic monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    The objective of the SMMP is to document compliance with the NWPA. In order to do so, a summary description of site characterization activities based on the consultation draft of the Site Characterization Plan and the final EA is provided. Subsequent chapters identify issues related to the potential for significant adverse impacts and the monitoring plans proposed to determine whether those impacts occur. Should monitoring confirm the potential for significant adverse impact, mitigative maesures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicable, any significant adverse environmental impacts. Proposed site characterization activites involve a variety of surface and subsurface activities including site preparation, access road construction and improvment, exploratory drilling and testing, geophysical surveys, geological mapping, and construction of the exploratory shaft facility. It is not anticipated that any significant adverse socioeconomic impacts will result form any of the proposed site characterization activities. However, the assessment of impacts in the EA, especially impacts related to employment and population growth, was based on assumptions concerning activities and conditions during the site characterization phase

  18. Treatability study on the Bear Creek Valley characterization area at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Phase II work plan for S-3 site contaminated groundwater interception--in-field media evaluation and groundwater capture methods

    International Nuclear Information System (INIS)

    A treatability study is being conducted to support implementation:of early actions at the S-3 Site in the Bear Creek Valley (BCV) Characterization Area (CA). The objectives of the early actions Will be (1) to reduce concentrations of uranium and nitrate in Bear Creek and (2) to reduce contaminants of concern in North Tributary (NT)-1 and NT-2. The BCV CA is located within the US DOE's Oak Ridge Reservation in Tennessee. Hazardous and radioactive materials from the Y-12 Plant operations were, disposed of at various sites within BCV. Groundwater and surface water in the BCV CA have been contaminated. The remedial investigation (RI) for the BCV CA identified that the greatest mass flux of contaminants from the various sources migrates via groundwater at the source and discharges to surface water in Bear Creek and its tributaries. In the RI, the combined discharge from the S-3 Site and the Boneyard/Burnyard (BYBY) was identified as accounting for 75% of the cancer risk and more than 80% of the chemical toxicity to Potential downgradient human receptors. In addition, the S-3 Site has caused degradation of surface water quality in upper Bear Creek and two of its tributaries. The BCV CA treatability study focuses on capture and treatment of shallow groundwater before it discharges to tributary waters. The objectives Of treatment of this groundwater are (1) to reduce the concentrations of uranium and nitrate in NT-1 and Bear Creek such that the concentrations of these chemicals in surface water and groundwater are reduced to acceptable levels, (2) to reduce the concentrations of nitrate and metals, and reduce the overall concentration of total dissolved solids; and (3) to hydraulically contain the plume of contaminated, groundwater that is moving in bedrock in the Nolichucky Shale such that the rate of contaminant discharge will be reduced in the long term. The objective of Phase II is to produce conceptual designs for treatment system configurations

  19. Annual Habitat Work Plan Conscience Point National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines the goals and objectives for management of the refuge’s grasslands and wetlands that includes the recovery effort for Sandplain Gerardia, the...

  20. Annual Habitat Work Plan Chincoteague National Wildlife Refuge 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan provides specific goals and objectives for how the refuge will manage its wetlands, beach, uplands, invasive species and artificial nesting.

  1. Annual Habitat Work Plan Wertheim National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management activities outlined in this plan include forest protection, grassland management, and wetland restoration, wildlife nesting structures and restoring...

  2. Test plan for FY-94 digface characterization field experiments

    International Nuclear Information System (INIS)

    The digface characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since fiscal year (FY) 1992 through the support of the Buried Waste Integrated Demonstration Program. A digface characterization system conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation digface and collects data that provide a basis for detecting, locating, and classifying buried materials and hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes ongoing efforts to test the digface characterization concept at the INEL's Cold Test Pit using a simplified prototype deployment apparatus and off-the-shelf sensors. FY-94 field experiments will explore problems in object detection and classification. Detection and classification of objects are fundamental to three of the four primary functions of digface characterization during overburden removal. This test plan establishes procedures for collecting and validating the digface characterization data sets. Analysis of these data will focus on testing and further developing analysis methods for object detection and classification during overburden removal

  3. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    International Nuclear Information System (INIS)

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

  4. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    Grabaskas, David [Argonne National Lab. (ANL), Argonne, IL (United States); Bucknor, Matthew [Argonne National Lab. (ANL), Argonne, IL (United States); Jerden, James [Argonne National Lab. (ANL), Argonne, IL (United States); Brunett, Acacia J. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-02-01

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

  5. 241-Z-361 Sludge Characterization Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    BANNING, D.L.

    1999-07-29

    This sampling and analysis plan (SAP) identifies the type, quantity, and quality of data needed to support characterization of the sludge that remains in Tank 241-2-361. The procedures described in this SAP are based on the results of the 241-2-361 Sludge Characterization Data Quality Objectives (DQO) (BWHC 1999) process for the tank. The primary objectives of this project are to evaluate the contents of Tank 241-2-361 in order to resolve safety and safeguards issues and to assess alternatives for sludge removal and disposal.

  6. 241-Z-361 Sludge Characterization Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    BANNING, D.L.

    1999-08-05

    This sampling and analysis plan (SAP) identifies the type, quantity, and quality of data needed to support characterization of the sludge that remains in Tank 241-2-361. The procedures described in this SAP are based on the results of the 241-2-361 Sludge Characterization Data Quality Objectives (DQO) (BWHC 1999) process for the tank. The primary objectives of this project are to evaluate the contents of Tank 241-2-361 in order to resolve safety and safeguards issues and to assess alternatives for sludge removal and disposal.

  7. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure

  8. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  9. Yucca Mountain Site Characterization Project Waste Package Plan

    International Nuclear Information System (INIS)

    The goal of the US Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP) waste package program is to develop, confirm the effectiveness of, and document a design for a waste package and associated engineered barrier system (EBS) for spent nuclear fuel and solidified high-level nuclear waste (HLW) that meets the applicable regulatory requirements for a geologic repository. The Waste Package Plan describes the waste package program and establishes the technical approach against which overall progress can be measured. It provides guidance for execution and describes the essential elements of the program, including the objectives, technical plan, and management approach. The plan covers the time period up to the submission of a repository license application to the US Nuclear Regulatory Commission (NRC). 1 fig

  10. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... Appropriation funding. Sustainability Policy All energy construction grants will proceed after business plans... storage in most villages is used for these power plants for distribution. Alternative means of generating... resources to meet commercial- ready renewable technology needs are available, yet a gap in meeting...

  11. Test plan for dig-face characterization performance testing

    Energy Technology Data Exchange (ETDEWEB)

    Josten, N.E.

    1993-09-01

    The dig-face characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since FY 1992 through the support of the Buried Waste Integrated Demonstration Program. A Dig-face Characterization System conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation dig-face and collects data that provide a basis for detecting, locating, and identifying hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes initial efforts to test the dig-face characterization concept at the INEL Cold Test Pit using a simplified prototype apparatus and off-the-shelf sensors. The Cold Test Pit is a simulated waste site containing hazardous and radioactive waste surrogates at known locations. Testing will be directed toward three generic characterization problems: metal detection, plume detection, and radioactive source detection. The prototype apparatus will gather data using magnetometers, a ground conductivity meter, a trace gas analyzer, and a gamma ray sensor during simulated retrieval of the surrogate waste materials. The data acquired by a dig-face characterization system are unique because of the high precision, high data density, and multiple viewpoints attainable through the dig-face deployment approach. The test plan establishes procedures for collecting and validating a representative dig-face characterization data set. Analysis of these data will focus on developing criteria for predicting the depth, location, composition, and other characteristics of the surrogate waste materials. If successful, this proof-of-concept exercise will provide a foundation for future development of a fully-operational system that is capable of operating on an actual waste site.

  12. Work function characterization of electroactive materials using an E MOSFET

    OpenAIRE

    Anh, Dam Thi Van; Olthuis, Wouter; Bergveld, Piet

    2004-01-01

    Materials with redox properties have been widely used in sensing applications. Understanding the redox properties of these materials is an important issue. In order to investigate the redox properties, there are several methods, such as using the Kelvin probe and a conductivity sensor, or using other well-known electrochemical techniques. In this paper, we introduce another possibility to characterize redox materials by investigating their work function using an electrolyte metal-oxide semico...

  13. Information system planning work on maintenance metrological equipment

    Directory of Open Access Journals (Sweden)

    Dmitry V. Shtoller

    2011-05-01

    Full Text Available Computerization has entered into all human activities. Important role in the work now is a workstation, which increases productivity. Did not remain without attention and work of the metrological services of enterprises. Electronic records can help solve many problems for the organization of data.

  14. Resilience in the planning of rail engineering work

    OpenAIRE

    Ferreira, Pedro N.P.

    2011-01-01

    The railway industry is today broadly recognised as a complex sociotechnical system that operates under considerable pressures for increased capacity and reliability. These pressures impact across the industry, in particular on rail engineering because of its responsibility in providing and maintaining the rail infrastructure. Within rail engineering, there is a growing need to address safety and operational risks emerging from high complexity. Planning has been identified as a fundamenta...

  15. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  16. The Work Incentives Planning and Assistance Program Promoting Employment Among Social Security Disability Beneficiaries

    OpenAIRE

    Jody Schimmel; Bonnie O'Day; Allison Roche

    2012-01-01

    This issue brief summarizes findings from the Work Incentives Planning and Assistance program, a Social Security Administration program to promote employment by providing beneficiaries with information about federal work supports.

  17. Final Hanford Site Transuranic (TRU) Waste Characterization Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP

  18. Geotechnical information as an important element when planning and designing civil engineering work Bogotá

    OpenAIRE

    Denisse Cangrejo Aljure; Carlos Gustavo Infante

    2010-01-01

    The city of Bogota provides a dynamic scenario re civil construction work; it is thereby essential to have relevant information available for the suitable planning and evaluation of engineering work from both the structural and budgetary points of view. The moisture content of soil has become a most important variable, given its great impact on placing structures in Bogota. This is why this work on city zoning aimed at orientating planning and designing civil engineering work has been done a...

  19. Simple Analysis of the university counsellors’ daily work and planning

    Institute of Scientific and Technical Information of China (English)

    Chen Juan

    2014-01-01

    Summary:Counsellor act as the backbone effect in students’ ideological and political work, who specialized in students’Ideological education and behavior management, and they are important component in teaching staff.

  20. Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)

    International Nuclear Information System (INIS)

    The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describes the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs

  1. Health and safety plan for characterization sampling of ETR and MTR facilities

    International Nuclear Information System (INIS)

    This health and safety plan establishes the procedures and requirements that will be used to minimize health and safety risks to persons performing Engineering Test Reactor and Materials Test Reactor characterization sampling activities, as required by the Occupational Safety and Health Administration standard, 29 CFR 1910.120. It contains information about the hazards involved in performing the tasks, and the specific actions and equipment that will be used to protect persons working at the site

  2. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  3. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites

  4. Characterization plan for the immobilized low-activity waste borehole

    International Nuclear Information System (INIS)

    The US Department of Energy's (DOE's) Hanford Site has the most diverse and largest amounts of radioactive tank waste in the US. High-level radioactive waste has been stored at Hanford in large underground tanks since 1944. Approximately 209,000 m3 (54 Mgal) of waste are currently stored in 177 tanks. Vitrification and onsite disposal of low activity tank waste (LAW) are embodied in the strategy described in the Tri-Party Agreement. The tank waste is to be retrieved, separated into low- and high-level fractions, and then immobilized by private vendors. The DOE will receive the vitrified waste from private vendors and dispose of the low-activity fraction in the Hanford Site 200 East Area. The Immobilized Low-Activity Waste Disposal Complex (ILAWDC) is part of the disposal complex. This report is a plan to drill the first characterization borehole and collect data at the ILAWDC. This plan updates and revises the deep borehole portion of the characterization plan for the ILAWDC by Reidel and others (1995). It describes data collection activities for determining the physical and chemical properties of the vadose zone and the saturated zone at and in the immediate vicinity of the proposed ILAWDC. These properties then will be used to develop a conceptual geohydrologic model of the ILAWDC site in support of the Hanford ILAW Performance Assessment

  5. Geodetic works in the process of planning and constructing telecommunication network

    OpenAIRE

    Zorc, Maruša

    2013-01-01

    The thesis deals with surveying work during the planning and construction of telecommunication network and subsequent entry into the cadastre of public infrastructure. Surveyor starts to work in the planning stage, because the constructor needs the correct underlay for the planning. At the same time surveyor provides a geodetic survey of the existing situation of the terrain. Then construction designed lines and facilities have to be staked out in nature. After the completion of construction ...

  6. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  7. Review of Taxation Work in 2005 and Plans for 2006

    Institute of Scientific and Technical Information of China (English)

    State Administration of Taxation

    2006-01-01

    @@ In 2005,China's total tax revenue topped 3.0866 trillion Yuan (excluding tariffs and agricultural taxes), up 20%and 514.8 billion Yuan over 2004 and exceeding 3 trillion Yuan for the first time. During the 10th five-year plan period,the total tax revenue remitted into the state coffer amounts to 10.9217 trillion Yuan, with an average annual increase of 19.5%; and the revenue in the fifth year more than doubles that in the first year. The fast and steady growth of the tax revenue in pace with the economic growth has greatly enhanced the country's financial strength and provided solid financial guarantee for the country's efforts to build a well-off society in an all-round way.

  8. Review of Taxation Work in 2005 and Plans for 2006

    Institute of Scientific and Technical Information of China (English)

    State; Administration; of; Taxation

    2006-01-01

      In 2005,China's total tax revenue topped 3.0866 trillion Yuan (excluding tariffs and agricultural taxes), up 20%and 514.8 billion Yuan over 2004 and exceeding 3 trillion Yuan for the first time. During the 10th five-year plan period,the total tax revenue remitted into the state coffer amounts to 10.9217 trillion Yuan, with an average annual increase of 19.5%; and the revenue in the fifth year more than doubles that in the first year. The fast and steady growth of the tax revenue in pace with the economic growth has greatly enhanced the country's financial strength and provided solid financial guarantee for the country's efforts to build a well-off society in an all-round way.……

  9. Predicting College Women's Career Plans: Instrumentality, Work, and Family

    Science.gov (United States)

    Savela, Alexandra E.; O'Brien, Karen M.

    2016-01-01

    This study examined how college women's instrumentality and expectations about combining work and family predicted early career development variables. Specifically, 177 undergraduate women completed measures of instrumentality (i.e., traits such as ambition, assertiveness, and risk taking), willingness to compromise career for family, anticipated…

  10. Group Work and Outreach Plans for College Counselors

    Science.gov (United States)

    Fitch, Trey, Ed.; Marshall, Jennifer L., Ed.

    2011-01-01

    In this book, group work and college counseling leaders offer step-by-step instruction in the effective use and processing of structured group activities on topics such as test anxiety; stress and anxiety management; ADHD; career development; substance abuse; eating disorders; and the unique concerns faced by GLBT students, first-generation…

  11. Environmental Monitoring and Mitigation Plan for site characterization:

    International Nuclear Information System (INIS)

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with the letter and the spirit of applicable environmental statues and regulations. This document - the NNWSI Project's Environmental Regulatory Compliance Plan (ERCP) - is one means of implementing the policy. The ERCP describes the plan by which the NNWSI Project Office will comply with applicable environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statues and regulations. To achieve the goals of DOE, the ERCP will be developed in phases. This version of the ERCP is the first phase in this development. It represents the NNWSI Project's understanding of environmental regulatory requirements for site characterization of Yucca Mountain. After consultation with appropriate Federal and State agencies, the ERCP will be updated to reflect the results of these consultations. 29 figs., 1 tab

  12. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  13. Collaborative for Historical Information and Analysis: Vision and Work Plan

    OpenAIRE

    Vladimir Zadorozhny; Patrick Manning; Daniel J. Bain; Ruth Mostern

    2013-01-01

    This article conveys the vision of a world-historical dataset, constructed in order to provide data on human social affairs at the global level over the past several centuries. The construction of this dataset will allow the routine application of tools developed for analyzing “Big Data” to global, historical analysis. The work is conducted by the Collaborative for Historical Information and Analysis (CHIA). This association of groups at universities and research institutes in the U.S. and Eu...

  14. Environmental monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    The purpose of the EMMP is: to identify, in consultation with the affected states and Indian tribes, potentially significant adverse environmental impacts that could result from site characterization activities, to describe data collection methods that will be used to monitor any such identified impacts, and procedures for mitigating them. Chapter 2 of the EMMP provides an overview of the background and scope of the document. Chapter 3 of the EMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construct the exploratory shafts and surface support facilities. The rationale for developing environmental monitoring studies is presented in Chapeter 4. Chapter 5 contains descriptions of the environmental monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the EMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 21 figs., 10 tabs

  15. [To develop the family planning work deeply through following the working method of "taking three as the keys"].

    Science.gov (United States)

    1982-11-29

    In recent years family planning work in China's Rongcheng County has been accomplished through "sudden attacks" on the problem, and although these concentrated work efforts have been successful, nevertheless there have been deleterious effects, e.g., a drain on the leadership such that work is affected, overburdened hospital workloads that lead to surgical mistakes, and pressure on the people's spirits. In order to ameliorate the situation, longterm planning was proposed in 1981 "to take three as the keys," i.e., to take propaganda education as the key in its relationship to economic measures, to take birth control as the key in its relationship to abortion, and to take longterm work as the key in its relationship to shortterm work. In 1981 Roncheng County increased its propaganda education efforts by making family planning the subject of numerous meetings, radio broadcasts, recordings, posters, and drama. It also emphasized positive education (i.e., teaching the good qualities of life conduct) and commended good people and good deeds. Family planning work also strengthened political education, making people aware of the policy of 1 child per family. Due to a sudden rise in unplanned 2nd pregnancies in Roncheng County, the number of abortions was high, so scientific knowledge of contraceptive use was widely disseminated to all fertile women. In order to make family planning function on a continous basis, one must grasp surely and carefully the primary work of organizations at all levels and be systematic in follow-ups. The results of "taking three as the keys" include: for the first 6 months of 1982 the single child rate was 95.63%; contraceptive use was more effective, causing the abortion rate to drop 10.3% from a comparable period in 1981; and 99.52% of 1-child-couples applied for Single Child Certificates. PMID:12159366

  16. Collaborative for Historical Information and Analysis: Vision and Work Plan

    Directory of Open Access Journals (Sweden)

    Vladimir Zadorozhny

    2013-02-01

    Full Text Available This article conveys the vision of a world-historical dataset, constructed in order to provide data on human social affairs at the global level over the past several centuries. The construction of this dataset will allow the routine application of tools developed for analyzing “Big Data” to global, historical analysis. The work is conducted by the Collaborative for Historical Information and Analysis (CHIA. This association of groups at universities and research institutes in the U.S. and Europe includes five groups funded by the National Science Foundation for work to construct infrastructure for collecting and archiving data on a global level. The article identifies the elements of infrastructure-building, shows how they are connected, and sets the project in the context of previous and current efforts to build large-scale historical datasets. The project is developing a crowd-sourcing application for ingesting and documenting data, a broad and flexible archive, and a “data hoover” process to locate and gather historical datasets for inclusion. In addition, the article identifies four types of data and analytical questions to be explored through this data resource, addressing development, governance, social structure, and the interaction of social and natural variables.

  17. Minister Peng inspects family planning work in Shandong.

    Science.gov (United States)

    1991-06-01

    Family planning (FP) programs in various villages in Shandong Province, China are discussed in terms of Minister Peng Peiyun's inspection. The visit by the State FP Commission officer was conducted with the Vice Governor and the Provincial FP Committee Director. 8 townships and villages in Yantai and Waihai prefectures were involved in the visits: Nanche Village of Shitou Town of Rongchen City, Zhangjia Township of Wendeng City, Yujia Village of Penglai County, and Xibeizhang Village of Pinglidian Town of Laizhou City. FP efforts and Minister Peng's comments are provided for these areas. IN Nanche village, Minister Peng said that farmers will support FP when the vast masses of the people of childbearing age are served. FP is important to political and social stability and economic development. In Zhangjia, Minister Peng visited a subcenter on education and said a solid basis for implementing FP is derived from paying sufficient attention to education on the basic principles of FP. In Yujia Village where there were no unplanned births, the village head answered the inquiry about FP success by saying the community persevered in developing the economy while simultaneously controlling population reproduction. A collective economy was formed with 7 small factories and 3 orchards. Annual income/capita in 1990 was 1,400 RMB Yuan. 300,000 RMB Yuan is devoted to the establishment of a kindergarten and primary school. An insurance system is operable. Childbearing desires changed with the relief from worries and the intensified education on population and FP. In Xibeizhang Village, which was designated a model for FP by governments in Shandong Province and Laizhou City, a provincial FP worker spoke directly to Minister Peng about the local activities. Encouragement on developing the 3 (educational and publicity, contraception, and daily management) to a new level and on surging ahead to bring about new achievement in FP was provided by Minister Peng to FP workers. PMID

  18. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation.

  19. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    International Nuclear Information System (INIS)

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation

  20. Technical Work Plan For: Meteorological Monitoring and Data Analysis

    International Nuclear Information System (INIS)

    The meteorological monitoring and analysis program has three overall objectives. First, the program will acquire qualified meteorological data from monitoring activities in the Environmental Safety and Health (ES and H) network, including appropriate controls on measuring and test equipment. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The continuously operating monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. Second, the program will process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. Third, reports containing analyses or calculations could be created to provide information to data requesters

  1. 76 FR 14995 - Comment Request for Information Collection for Work-Flex Plan Submission and Reporting...

    Science.gov (United States)

    2011-03-18

    ... Investment Act (Pub. L. 105-220, August 7, 1998) permits states to apply for a workforce flexibility (Work... program improvements. The Act provides that the Secretary may grant Work-Flex waiver authority for up to... Request for Information Collection for Work-Flex Plan Submission and Reporting Requirements;...

  2. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  3. Technical Work Plan for: Additional Multiscale Thermohydrologic Modeling

    International Nuclear Information System (INIS)

    will be evaluated and justified. Some of this evaluation will be conducted in conjunction with the post-model development validation activity involving comparisons of predicted TH conditions with measured TH conditions in the DST. The expected result is that, consistent with what was found in Revision 03 of Multiscale Thermohydrologic Model (BSC 2005 [DIRS 173944], Section 6.3.9), near-field/in-drift TH behavior is insensitive to a wide range of host-rock hydrologic property values. It is the intention of the work described in this TWP to propagate the new infiltration fluxes from the replacement infiltration model, by using the percolation fluxes from the revised site-scale unsaturated zone (UZ) flow model that has applied those new infiltration fluxes. The percolation flux distributions will be obtained from the updated site-scale UZ flow model, which has applied updated infiltration flux maps. Another objective of the work scope is to develop, implement, and validate a revised TH submodel-construction approach. This revised approach utilizes interpolation among a set of generic LDTH submodels that are run for a range of percolation flux histories that cover a sufficiently broad range of infiltration flux uncertainty, as well as for four host-rock units (two lithophysal units and two nonlithophysal units), and for three thermal property sets (low, mean, and high). A key motivation for this revised LDTH submodel-construction approach is to enable the MSTHM to be more flexible in addressing a broad range of infiltration flux cases. This approach allows the generic LDTH submodel simulations to be conducted prior to receiving percolation flux maps

  4. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1988-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501. the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1989. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3 of the Program. The Work Plan includes schedules with key milestones for FY 1989 and beyond, and is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded projects discussed in the FY 1989 Work Plan are listed in Tables 1 and 2 according to their current status. Table 1 (pp. 3-11) lists completed, ongoing, and deferred projects. Table 2 (pp. 12-13) lists all projects which BPA plans to fund as ''new'' projects in FY 1989. ''Ongoing'' status indicates that the project started in FY 1988 or before, and that it was still being implemented by BPA at the end of FY 1988. &apos

  5. Tank 241-AP-106 tank characterization plan: Revision 1

    International Nuclear Information System (INIS)

    Tank 241-AP-106 (AP-106) is a candidate feed tank which is expected to be processed at the 242-A Evaporator. Three issues related to the overall concern of the evaporator must be evaluated: compatibility of the candidate waste with respect to feed tank, slurry tank, and evaporator requirements; safety parameters of the candidate waste tank to avoid a facility condition which is outside the safety boundaries; and compliance of the waste as dictated by regulations from various government and environmental agencies. The characterization efforts of this Tank Characterization Plan are focused on the resolution of the issues above. To evaluate the potential for waste incompatibility with the feed tank, slurry tank, and evaporator, as well as relevant safety issues, analyses will be performed on the grab samples obtained from tank AP-106. These analyses are discussed in Section 4.0. Once the characterization of tank AP-106 has been performed, the waste compatibility and safety assessment shall be conducted. This effort is discussed elsewhere

  6. Site characterization and the method of multiple working hypotheses

    International Nuclear Information System (INIS)

    Geologic investigations are necessary to determine whether a site is suitable for repository development and, if suitable, whether the site complies with regulatory requirements. Geologic processes and events often cannot be characterized without some degree of residual uncertainty. The method of multiple working hypotheses (MWH) is an approach in which alternative explanations for natural processes and/or events are identified, tested, and evaluated. This paper reports that in practice, several hypotheses may remain viable after all reasonable studies have been completed. Within the context of waste management and civil construction projects, all viable hypotheses that correspond with potential natural hazards must be analyzed in terms of adverse consequences to public health and safety, including radiological safety. For the repository licensing process, viable hypotheses remaining after the evaluation of data and quantification of uncertainty must be analyzed with regard to their consequences related to waste isolation. This approach can be used to determine whether additional studies are necessary to complete the license application

  7. Characterization of low concentration uranium glass working materials

    Energy Technology Data Exchange (ETDEWEB)

    Eppich, G. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wimpenny, J. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Leever, M. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Knight, K. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hutcheon, I. D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Ryerson, F. J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-03-22

    A series of uranium-doped silicate glasses were created at (Lawrence Livermore National Laboratory) LLNL, to be used as working reference material analogs for low uranium concentration research. Specifically, the aim of this effort was the generation of well-characterized glasses spanning a range of concentrations and compositions, and of sufficient homogeneity in uranium concentration and isotopic composition, for instrumentation research and development purposes. While the glasses produced here are not intended to replace or become standard materials for uranium concentration or uranium isotopic composition, it is hoped that they will help fill a current gap, providing low-level uranium glasses sufficient for methods development and method comparisons within the limitations of the produced glass suite. Glasses are available for research use by request.

  8. 77 FR 43237 - Genome in a Bottle Consortium-Work Plan Review Workshop

    Science.gov (United States)

    2012-07-24

    ... National Institute of Standards and Technology Genome in a Bottle Consortium--Work Plan Review Workshop.... SUMMARY: NIST announces the Genome in a Bottle Consortium meeting to be held on Thursday and Friday, August 16 and 17, 2012. The Genome in a Bottle Consortium is planning to develop the reference...

  9. Natural Resource Program Center Inventory and Monitoring Fiscal Year 2012 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Natural Resource Program Center annual work plan discusses the goals and objectives of the Inventory and Monitoring IM program for fiscal year 2012. The...

  10. National Wildlife Refuge System Region 4 Inventory and Monitoring Fiscal Year 2012 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 4 discusses the goals and objectives of the Inventory and Monitoring IM program for fiscal year 2012. The introduction includes the...

  11. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Science.gov (United States)

    2010-01-01

    ... approved work plan represents a commitment by a power supply borrower and its members, or by a large... the majority of the members that are borrowers. (j) The borrower's board of directors must approve...

  12. National Wildlife Refuge System Region 7 Inventory and Monitoring Regional Annual Work Plan Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 7 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  13. Region 1 National Wildlife Refuge System Inventory and Monitoring Program : Annual Work Plan : Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 1 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  14. METHOD OF PLANNING OF TRAINING LOAD FACTORED IN RESULT OF WORK OF TEACHERS

    OpenAIRE

    Grigorash O. V.

    2013-01-01

    This article proposes a method of planning of academic teaching staff training load based on teaching and guiding and research work in the accounting period, which allowing to increase the performance indicator

  15. Region 8 (Pacific Southwest Region) Fiscal Year 2012 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 8 discusses the goals and objectives of the Inventory and Monitoring IM program for fiscal year 2012. The introduction includes the...

  16. FY2004 Progress Summary and FY2005 Program Plan Statement of Work and Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Meier, W; Bibeau, C

    2006-01-23

    FY2004 progress summary and FY2005 program plan statement of work and deliverables for development of high average power diode-pumped solid state lasers, and complementary technologies for applications in energy and defense.

  17. Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan

    International Nuclear Information System (INIS)

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)

  18. Didactical-methodical aspects of planning the educative work at the Macedonian educational system

    OpenAIRE

    Mirascieva, Snezana

    2010-01-01

    This paper is about one new didactical- methodical approach in the planning of the educational work at the educational institutions in Macedonia which is in function of the professional development of the teaching staff. The paper presents a new practice which is introduced at the educational system in Republic of Macedonia, and which refers on two key questions like integrated planning of the educational work and ecology education at the educational institutions on three levels: pre-school, ...

  19. Tank 241-AP-107 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    Defense Nuclear Facilities Safety Board has directed the DOE to concentrate ear-term sampling and analysis activities on identification and resolution of issues (Conway 1993). The Data Quality Objective (DQO) process was chosen as a tool to be used in the resolution of safety issues. As a result, a revision in the Federal Facilities Agreement and Consent Order (Tri-Party Agreement) milestone M-44-00 has been made, which states that ''A Tank Characterization Plan (TCP) will be developed for each double-shell tank (DST) and single-shell tank (SST) using the DQO process; Development of TCPs by the DQO process is intended to allow users (e.g., Hanford Facility user groups, regulators) to ensure their needs will be met and that resources are devoted to gaining only necessary information.'' This document satisfies that requirement for the tank 241-AP-107 (AP-107)

  20. RFI/RI work plan for the Road A Chemical Basin 904-111G

    Energy Technology Data Exchange (ETDEWEB)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  1. RFI/RI work plan for the Road A Chemical Basin 904-111G

    International Nuclear Information System (INIS)

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities

  2. Final work plan : targeted groundwater sampling and monitoring well installation for potential site reclassification at Barnes, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-07-11

    This ''Work Plan'' outlines the scope of work for a targeted groundwater sampling investigation and monitoring well installation at Barnes, Kansas. This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with the intergovernmental agreement between the KDHE and the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA). Data resulting from the proposed work will be used to determine the hydraulic gradient near the former CCC/USDA facility, delineate the downgradient carbon tetrachloride plume, and determine additional monitoring requirements at Barnes. The overall goal is to establish criteria for monitoring leading to potential site reclassification. The proposed work will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The Farm Service Agency of the USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a ''Master Work Plan'' (Argonne 2002) to provide general guidance for all investigations at former CCC/USDA facilities in Kansas. The ''Master Work Plan'', approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Barnes.

  3. Understanding work-related social media use: An extension of theory of planned behavior.

    NARCIS (Netherlands)

    W. van Zoonen; J.W.M. Verhoeven; W.J.L. Elving

    2014-01-01

    This study examines the motives of employees to engage in work related social media use - i.e. the use of personal social media accounts to communicate about work-related issues. The theory of planned behavior (TPB) was used to explain this behavior. Because social media can enable users to express

  4. Knowledge Transfer Plan of Action for Biomass. Working Group Technology and Knowledge August 2003 - August 2004

    International Nuclear Information System (INIS)

    As part of the title Plan of Action six working groups are involved in finding solutions to the most important bottlenecks in the market introduction of bio-energy systems. In the working group on Technology and Knowledge an overview is given of the best biomass technology/product combinations

  5. Working with the NCL - Process Overview - Nanotechnology Characterization Laboratory

    Science.gov (United States)

    The Nanotechnology Characterization Lab's (NCL) charter is to serve as a national characterization facility for nanomaterials submitted from academia, industry, and other government laboratories, i.e., intramural and extramural sources.

  6. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    Pentecost, E.D.; Vinikour, W.S. [Argonne National Lab., IL (United States)

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods.

  7. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  8. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  9. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  10. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  11. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  12. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  13. Management of comments on DOE's Site Characterization Plan (SCP) and integration with the planned geotechnical program

    International Nuclear Information System (INIS)

    The US DOE has committed to respond to comments on the SCP throughout the site characterization process. As of January 1990 DOE has received 4,574 comments on both the SCP/Consultation Draft and the statutory SCP. Of these, 2,662 responses have been completed and returned to the originators. Many comments are programmatic in nature and express diverse concerns beyond the scope of the SCP. DOE uses a three-tiered process in responding to comments that integrated technical and management responsibilities. The process defines specific roles in developing, reviewing, and concurring on responses. Commitments or open-items can be generated in DOE responses to comments, which are tracked on a relational database. Major changes reflected in the Secretary of Energy's 1989 reassessment of the high-level waste program were advocated in comments on the SCP. Most DOE commitments, however, deal with consideration of recommendations contained in SCP comments relevant to low-levels of technical planning detail (SCP Study Plans). Commitments are discharged when referred to the appropriate quality-affecting or management process whereupon their merits can be evaluated

  14. Description of work for 200-UP-1 characterization of monitoring wells

    International Nuclear Information System (INIS)

    This description of work details the field activities associated with the drilling, soil sampling, and construction of groundwater monitoring and dual-use wells as part of the Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit and will serve as a field guide for those performing the work. It will be used in conjunction with DOE-RE and Environmental Investigations and Site Characterization Manual. Groundwater wells are being constructed to characterize the vertical and horizontal extent of the Uranium and 99Tc plumes and to define aquifer properties such as hydraulic communication between aquifers and hydrostratigraphy. Some of these wells may be utilized for extraction purposes during the Interim Remedial Measures (IRM) phase anticipated at this operable unit and are being designed with a dual use in mind. These data will be used to optimize the IRM for the cleanup of these two plumes. The data will also be used with later Limited Field Investigation data to perform a Qualitative Risk Assessment for the operable unit. The locations for the proposed groundwater wells are presented. The contaminants of concern for the project are presented also

  15. 118-C-4 Horizontal Rod Cave characterization plan

    International Nuclear Information System (INIS)

    This characterization plan provides instructions for obtaining and analyzing samples for waste designation and disposal. The 118-C-4 Horizontal Rod Cave is located in the 100-C Area about 328 ft (100 m) southeast of the 105-C Reactor (Figure 1). The 118-C-4 Horizontal Rod Cave (Figure 2) is a reinforced concrete bunker approximately 70- ft (21.3-m) long, 7-ft (2.1-m) high, and 12-ft (3.6-m) wide, with triangular-shaped concrete ends 3-ft (0.9-m) high. The rod cave was used to store radiologically contaminated control-rod tips. If control rod tips are present, release of control rod activation products will not change expectations with respect to principal contaminants. The north portion of the cave is empty and the south portion contains two aluminum tubes that may contain rod tips (Figure 3). The caves are contaminated with activation and fission products (e.g., 60Co and 137Cs) common to the 100 Areas (see Appendix for data). Dose rates up to 0.7 mR/hr were measured in the south cave and 0.5 mR/hr in the north cave during an inspection of the facility in December 1996

  16. Sectored Clean-up Work Plan for Housekeeping Category Waste Sites

    International Nuclear Information System (INIS)

    The Sectored Clean-up Work Plan (SCWP) replaces the Housekeeping Category Corrective Action Unit Work Plan and provides a strategy to be used for conducting housekeeping activities using a sectored clean-up approach. This work plan provides a process by which one or more existing housekeeping category Corrective Action Sites (CASS) from the Federal Facility Agreement and Consent Order and/or non-FFACO designated waste site(s) are grouped into a sector for simultaneous remediation and cleanup. This increases effectiveness and efficiencies in labor, materials, equipment, cost, and time. This plan is an effort by the U.S. Department of Energy to expedite work in a more organized and efficient approach. The objectives of this plan are to: Group housekeeping FFACO CASS and non-FFACO housekeeping sites into sectors and remediate during the same field visit; Provide consistent documentation on FFACO CAS and non-FFACO clean-up activities; Perform similar activities under one approved document; Remediate areas inside the Deactivation and Decommissioning facilities and compounds in a campaign-style remediation; and Increase efficiencies and cost-effectiveness, accelerate cleanups, reduce mobilization, demobilization, and remediation costs

  17. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  18. Characterization of HDR Ir-192 source for 3D planning system

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Gabriel P.; Yoriyaz, Helio; Antunes, Paula C.G.; Siqueira, Paulo T.D., E-mail: gabriel.fonseca@usp.b, E-mail: hyoriyaz@ipen.b, E-mail: ptsiquei@ipen.b [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil); Rubo, Rodrigo [Universidade de Sao Paulo (HC/FMUSP), Sao Paulo, SP (Brazil). Hospital das Clinicas. Servico de Radioterapia; Minamisawa, Renato A., E-mail: renato.minamisawa@psi.c [Paul Scherrer Institut (PSI), Villigen (Switzerland); Ferreira, Louise A. [Universidade Estadual de Maringa (UEM), PR (Brazil). Fac. de Medicina

    2011-07-01

    Brachytherapy treatment involves surgical or cavitary insertion of radioactive sources for diseases treatments, such as: lung, gynecologic or prostate cancer. This technique has great ability to administer high doses to the tumor, with adjacent normal tissue preservation equal or better than external beam radiation therapy. Several innovations have been incorporated in this treatment technique, such as, 3D treatment planning system and computer guided sources. In detriment to scientific advances there are no protocols that relate dose with tumor volume, organs or A point, established by ICRU38 and used to prescribe dose in treatment planning system. Several international studies, like as EMBRACE, the multicentre international study, has been trying to correlate the dose volume using 3D planning systems and medical images, as those obtained by CT or MRI, to establish treatment protocols. With the objective of analyzing the 3D dose distribution, a micro Selectron-HDR remote afterloading device for high dose-rate (HDR) was characterized in the present work. Through the data provided by the manufacturer the source was simulated, using the MCNP5 code to calculate American Association of Physicists in Medicine Task Group No. 43 report (AAPM TG43) specified parameters. The simulations have shown great agreement when compared to the ONCENTRA planning system results and those provided by literature. The micro Selectron-HDR remote afterloading device will be utilized to simulate 3D dose distribution through CT images processed by an auxiliary software which process DICOM images. (author)

  19. Multi-Year Work Plan to De-Inventory TRU Waste Stored at LANL - 12121

    International Nuclear Information System (INIS)

    The Los Alamos National Laboratory (LANL) continues to accelerate disposition of transuranic (TRU) waste stored at its Technical Area 54 (TA-54) Area G waste management facility. The current focus is on complete removal of all non-cemented above-grade Legacy and newly-generated TRU waste that was in storage on October 1, 2011, by no later than June 30, 2014. This inventory of above-grade TRU is defined as 3,706 m3 of material. Legacy TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory are largely in place, but two additional oversize box processing lines are being implemented in 2012. Multiple work shifts are planned for most remediation lines in 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 70 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Processing of the 3,706 m3 is projected to result in about 4,500 55-gallon (208 L) drums and 1,000 standard waste boxes that will be shipped to WIPP. About 385 shipments from LANL to WIPP are projected before June 30, 2014, to ship these

  20. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-22

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  1. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  2. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  3. Planning Student Work-Study Time in an Objectives-Based Medical Curriculum

    Science.gov (United States)

    Colvin, Robert H.; Taylor, D. Dax

    1978-01-01

    By developing, validating, and using a formula for predicting students' time commitment to their studies, those responsible for developing curricula can make their planning more precise. The Estimated Module Work-Study Time formula developed at Southern Illinois University School of Medicine is described. (Author/LBH)

  4. The effects of moderate heat stress and open-plan office noise distraction on office work

    DEFF Research Database (Denmark)

    Witterseh, Thomas; Wyon, David; Clausen, Geo

    2002-01-01

    Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P...

  5. The Interplay between Women's Life Course Work Patterns and Financial Planning for Later Life

    Science.gov (United States)

    Berger, Ellie D.; Denton, Margaret A.

    2004-01-01

    In order to gain a comprehensive understanding of the interplay between women's life course work patterns and their financial planning for later life, we examined data from semi-structured interviews with retired women (n = 28) aged 59 to 92. The majority of women disrupted their careers at some point in time, for an average of 14 years, primarily…

  6. Planning of work of on-board systems of spacecrafts using the coordinate control methods

    OpenAIRE

    Ожінський, Віктор Васильович; Парфенюк, Василь Григорович

    2016-01-01

    The approaches to develop the tasks of planning the work of on-board systems of spacecrafts (IS) of Earth observation using the coordinate control methods by on-board and ground-based equipment are considered. The new methods of functioning of on-board control complex in the autonomous flight suggested.

  7. Work plan for defining a standard inventory estimate for wastes stored in Hanford site underground tanks

    International Nuclear Information System (INIS)

    This work plan addresses the methodology for defining a tank waste database that will provide a best basis estimate of waste characteristics for each underground storage tank. The resulting database is expected to be in place in a network accessible electronic form by September 1996

  8. Planning of Allowable Cut in Working Forest Groups of Calabrian Pine for Timber Production

    OpenAIRE

    Gül, Altay Uğur

    1998-01-01

    Linear programming models were developed and solved according to different interest rates and rotation periods for the planning of allowable cut using data obtained from working forest groups of calabrian pine in the Gazipaşa Forest Enterprise in Antalya. Then, the most suitable rotation period; regeneration and afforestation area; total and annual allowable cut; and present net value were determined.

  9. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Science.gov (United States)

    2010-01-01

    ... 25.403. Agriculture Office of the Secretary of Agriculture RURAL EMPOWERMENT ZONES AND ENTERPRISE COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment... conditional upon the designation of the community as an Empowerment Zone; and (iv) Documentation...

  10. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

  11. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    International Nuclear Information System (INIS)

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts

  12. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    International Nuclear Information System (INIS)

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable

  13. Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1

    International Nuclear Information System (INIS)

    This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn't bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem

  14. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    International Nuclear Information System (INIS)

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided

  15. The IAU Division A Working Group on the Third Realization of the ICRF: Background, Goals, Plans

    Science.gov (United States)

    Gaume, Ralph

    2015-08-01

    The XXVIII General Assembly of the IAU (Beijing, 2012) established the Division A Working Group on the Third Realization of the International Celestial Reference Frame (ICRF). The adopted charter of the ICRF3 Working Group includes a commitment to report on the implementation and execution plans for ICRF3 during the XXIX General Assembly of the IAU along with a targeted completion and presentation of ICRF3 in 2018 to the XXX General Assembly for adoption. This talk will discuss the background, purpose, and overall implementation plan for ICRF3, and motivate the concept, currently under consideration by the ICRF3 Working Group, that future realizations of the ICRF be based on multi-frequency astrometric data, starting with ICRF3.

  16. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  17. Repository safety in the post-charging phase (framework plan for necessary R and D work)

    International Nuclear Information System (INIS)

    The framework plan gives an account of the current status and further, still necessary research and development work for the elaboration of scientific fundamentals and for the development of methods for the safety analysis of a future Federal radwaste repository for heat-releasing radioactive waste in salt formations. The framework plan is subdivided into a task catalog and a part with project descriptions. The task catalog covers the four subject areas: Scenarios and programs, chemical effects in the close-in area, geotechnical and physical effects in the close-in area, transport processes in the geosphere. (DG)

  18. Basic planning and work performance of Hanford Site environmental management activities

    International Nuclear Information System (INIS)

    This document provides an overview of the basic planning and work of the Department of Energy Richland Operations Office (DOE-RL). It defines key terms, concepts, and processes used in Hanford's Environmental Management (EM) activities. It is not intended to provide complete details on the topics discussed. It does, however, provide a roadmap of the overall process so that opportunities for tribal, regulator, and public involvement can be clearly identified. Many documents are referenced in this plan. Each is described in some detail in Section 5, and cross-references to that section are provided throughout the discussion in Sections 1 through 4

  19. Benchmark requirements for the Energy Emergency Management Information System (EEMIS). Phase 1. Work plan

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-22

    EEMIS has responsibility for providing special information and communication services to government officials, at Federal and state levels, who must deal with energy emergencies. Because of proprietary information residing in the data base used for Federal purposes, a special system (EEMIS-S) must be established for use by the states. It is planned to acquire teleprocessing services for EEMIS-S from a time-sharing commercial vendor, and the process for procurement must meet guidelines for approval. The work plan and schedule for meeting these guidelines are discussed. Tasks to be included contain estimates of time, cost, and resources required, all of which are briefly described.

  20. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  1. Tank 241-U-111 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-U-111

  2. Tank 241-BX-103 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-BX-103

  3. Tank 241-BX-109 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-BX-109

  4. Tank 241-BX-106 tank characterization plan. Revision 1

    International Nuclear Information System (INIS)

    This document is a plan that identifies the information needed to address relevant issues concerning short-term and long-term safe storage and long-term management of Single-Shell Tank (SST) 241-BX-106

  5. Inadequacy of von Neumann entropy for characterizing extractable work

    International Nuclear Information System (INIS)

    The lack of knowledge that an observer has about a system limits the amount of work it can extract. This lack of knowledge is normally quantified using the Gibbs/von Neumann entropy. We show that this standard approach is, surprisingly, only correct in very specific circumstances. In general, one should use the recently developed smooth entropy approach. For many common physical situations, including large but internally correlated systems, the resulting values for the extractable work can deviate arbitrarily from those suggested by the standard approach.

  6. Quantified diagnostic work-up casts: applications for interdisciplinary treatment planning.

    Science.gov (United States)

    Solow, Roger A

    2016-01-01

    Diagnostic casts that accurately replicate a patient's occlusion are essential for planning comprehensive care and interdisciplinary treatment. These casts can reveal the actual problem in the spatial relationship between the maxilla and the mandible, which may not be apparent on intraoral examination. Duplicate casts can be altered and measured to quantify the extent of the correction necessary for a predictable result. Treatment planning for interdisciplinary cases requires thorough evaluation of the entire problem and solution set as well as coordination of all procedures. Severe problems and invasive treatments require precise treatment planning. This case report illustrates these principles through multiple applications of quantified diagnostic work-up casts for a patient requiring orthognathic surgery, orthodontics, and occlusal adjustment after a mandibular subcondylar fracture. PMID:27148655

  7. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-03-05

    his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  8. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-03-05

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  9. Work plan, health and safety plan, and quality assurance project plan for hazardous waste removal at the CTF K-1654B underground collection tank

    Energy Technology Data Exchange (ETDEWEB)

    Panter, M.S.; Burman, S.N.; Landguth, D.C.; Uziel, M.S.

    1991-10-01

    The Central Training Facility (CTF), located on Bear Creek Road approximately two miles south of the K-25 Site, is utilized for training security personnel at Martin Marietta Energy Systems, Inc., Oak Ridge, Tennessee. At the request of the CTF staff, this plan has been developed for the removal of the waste contents in the facility's 500-gal septic tank and associated distribution box. The septic tank and distribution box were historically located beneath the K-1654B trailer and adjacent to the K-1654A Indoor Firing Range. Recently, however, the K-1654B trailer was removed to accommodate the objectives of this work plan as well as future construction activities planned at CTF. The purpose of this plan is to develop and assign responsibilities, establish personnel protection requirements and mandatory safety procedures, and provide for contingencies that may arise while operations are being conducted by ORNL/MAD at the CTF K-1654B underground collection tank site. This document addresses requirements of 29 CFR 1910.120, Final Rule, with respect to aspects of health and safety applicable to an underground collection tank waste removal.

  10. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  11. Determination of the work scope for removal of speed restrictions related to the track plan

    Directory of Open Access Journals (Sweden)

    I.P. Korzhenevich

    2012-08-01

    Full Text Available The greatest number of restrictions is related to the parameters and condition of curvilinear track sections. The technique for determination of cost of reorganization of curves at introduction of high-speed traffic for difficult sections of the track plan is developed. The law of work scope change depending on methods of the curve reorganization is established: expanding an existing track bed, adding a new track bed to existing one or shifting a track bed to a new route.

  12. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement.

  13. Geodetic works in the process of planning and constructing a biogas plant

    OpenAIRE

    Hajdenek, Lidija

    2011-01-01

    Land surveying plays an important role in the process of building constructions. Apart from providing geodetic plans, land surveying also manages procedures that are necessary for the real estate data recording. At the same time the legislation of land survey services needs to be followed, because the changes of legislation consequently play the role in land surveying in the process of building construction. The land surveying works must be carried out with high quality, because they present ...

  14. Work plan for testing silicone impression material and fixture on pool cell capsule

    International Nuclear Information System (INIS)

    The purpose of this work plan is to provide a safe procedure to test a cesium capsule impression fixture at Waste Encapsulation and Storage Facility (WESF). The impression will be taken with silicone dental impression material pressed down upon the capsule using the impression fixture. This test will evaluate the performance of the fixture and impression material under high radiation and temperature conditions on a capsule in a WESF pool cell

  15. Project Work Plan: Hanford 100-D Area Treatability Demonstration - In Situ Biostimulation for Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Fruchter, Jonathan S.; Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.

    2006-05-31

    This work plan supports a new, integrated approach to accelerate cleanup of chromium in the Hanford 100 Areas. This new approach will provide supplemental treatment upgradient of the ISRM barrier by directly treating chromium and other oxidizing species in groundwater (i.e., nitrate and dissolved oxygen), thereby increasing the longevity of the ISRM barrier and protecting the ecological receptors and human health at the river boundary.

  16. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  17. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  18. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy's (DOE's) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow

  19. Informal work and formal plans: Articulating the active role of patients in cancer trajectories

    DEFF Research Database (Denmark)

    Dalsted, R.; Hølge-Hazelton, Bibi; Kousgaard, MB; Andersen, John Sahl

    2013-01-01

    Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer trajectories....... participation. When looking at integrated care from the perspective of patients, the development of a more holistic and personalized approach is needed....... patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  20. ALARA database value in future outage work planning and dose management

    International Nuclear Information System (INIS)

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system's ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed

  1. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1987-1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide Bonneville Power Administration (BPA) in carrying out our responsibility to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gave BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife were affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for Program implementation during Fiscal Year (FY) 1988. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Program's Action Plan: to provide a solid, timely, and focused basis for budgeting and planning. Additionally, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3. It includes schedules with key milestones for FY 1988 through FY 1990. The Work Plan is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program.

  2. West African cattle breeds characterizations: Review of CIRDES genetic works

    International Nuclear Information System (INIS)

    Full text: The improvement of domestical animal breeds productivity or the animal genetic diversity maintenance to allow breeders to select animals or to create new breeds in order to adapt to environmental modifications, new diseases and societies needs, requires first a detailed inventory and, secondly, a genetic characterization of domestic animal breeds. Indeed, in developing countries, the notion of breed is not clear; visual parameters are often used even if these procedures are subjective. So it is necessary to complete this phenotypic approach by a genomic one in order to contribute to an efficient characterization. At CIRDES, a regional center for subhumid livestock research and development, these studies have been conducted during the past ten years. They permitted (i) to describe the cattle phenotypic traits and their geographical localization and to highlight the breeds threatened with extinction, (ii) to determine zebu introgression level in taurine trypanotolerant cattle (iii) to identify specific alleles of different cattle breeds, and (iv) to quantify the importance of Robertson translocation in livestock production. Data collection has been realized using a bibliography study, completed by investigations in seven countries of West Africa. Blood collection has been also done for an analysis of 4 categories of genome markers (11 blood group systems, 3 blood protein loci, microsatellites and chromosomes). According to phenotypic description and to the conceptions of autochtone human population, 13 local cattle breeds have been identified: Ndama, Kouri, the group Baoule-Somba, the group Lagoon cattle, zebu Azawak, zebu Maure, zebu Touareg, zebu Goudali, zebu Bororo, zebu White Fulani, zebu Djelli, zebu peuhl soudanien, zebu Gobra, and their crossbreds (Zebu x Ndama and Zebu x West African Shorthorns). Nine exotic breeds have been also identified: American Brahman, Gir, Girolando, Droughtmaster, Santa Gertrudis, Holstein, Montbeliarde, Jersey and Brown

  3. Waste Characterization Plan for the Hanford Site single-shell tanks. Appendix D, Quality Assurance Project Plan for characterization of single-shell tanks: Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Hill, J.G.; Winters, W.I.; Simpson, B.C. [Westinghouse Hanford Co., Richland, WA (United States); Buck, J.W.; Chamberlain, P.J.; Hunter, V.L. [Pacific Northwest Lab., Richland, WA (United States)

    1991-09-01

    This section of the single-shell tank (SST) Waste Characterization Plan describes the quality control (QC) and quality assurance (QA) procedures and information used to support data that is collected in the characterization of SST wastes. The section addresses many of the same topics discussed in laboratory QA project plans (QAPjP) (WHC 1989, PNL 1989) and is responsive to the requirements of QA program plans (QAPP) (WHC 1990) associated with the characterization of the waste in the SSTs. The level of QC for the project depends on how the data is used. Data quality objectives (DQOs) are being developed to support decisions made using this data. It must be recognized that the decisions and information related to this part of the SST program deal with the materials contained within the tank only and not what may be in the environment/area surrounding the tanks. The information derived from this activity will be used to determine what risks may be incurred by the environment but are not used to define what actual constituents are contained within the soil surrounding the tanks. The phases defined within the DQOs on this Waste Characterization Plan follow the general guidance of the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) yet are pertinent to analysis of the contents of the tanks and not the environment.

  4. Evaluation of the probabilistic safety assessment portfolio for NSD. Plan of work

    International Nuclear Information System (INIS)

    The aim is to use the research portfolio evaluation protocol developed by HSL to evaluate the Probabilistic Safety Assessment (PSA) portfolio, both to draw conclusions about the PSA portfolio and as a pilot study to show the suitability of the evaluation protocol. The objectives of the work are: (1) To collect sufficient information to carry out a preliminary review of the portfolio; (2) o produce a plan of work detailing the time and costs to carry out a full evaluation of the PSA portfolio; (3) to evaluate the PSA portfolio of research; (4) to produce a report of the evaluation of the PSA portfolio; (5) if necessary, to make changes to the methodology in light of the experience gained in the evaluation of the PSA research portfolio. This report completes objectives 1 and 2. It details the plan of work for the evaluation of the PSA research portfolio. The plan has shown that the evaluation of the PSA research portfolio has many difficulties to overcome. It is suitable as a pilot study to show the suitability of the portfolio evaluation protocol and will provide valuable information that can be used to improve it. The evaluation of the PSA portfolio will require a considerable amount of time and effort to complete. The task analysis has shown it to be of the order of Pound Sterling 25k and to take two months to complete after this preliminary data collection. The plan to evaluate the PSA research portfolio detailed in this report should be carried out and the lessons learned by carrying out this pilot study should be used to improve the evaluation protocol

  5. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer...

  6. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment, safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal...

  7. Risk-Informed Safety Margin Characterization Methods Development Work

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Curtis L; Ma, Zhegang; Tom Riley; Mandelli, Diego; Nielsen, Joseph W; Alfonsi, Andrea; Rabiti, Cristian

    2014-09-01

    This report summarizes the research activity developed during the Fiscal year 2014 within the Risk Informed Safety Margin and Characterization (RISMC) pathway within the Light Water Reactor Sustainability (LWRS) campaign. This research activity is complementary to the one presented in the INL/EXT-??? report which shows advances Probabilistic Risk Assessment Analysis using RAVEN and RELAP-7 in conjunction to novel flooding simulation tools. Here we present several analyses that prove the values of the RISMC approach in order to assess risk associated to nuclear power plants (NPPs). We focus on simulation based PRA which, in contrast to classical PRA, heavily employs system simulator codes. Firstly we compare, these two types of analyses, classical and RISMC, for a Boiling water reactor (BWR) station black out (SBO) initiating event. Secondly we present an extended BWR SBO analysis using RAVEN and RELAP-5 which address the comments and suggestions received about he original analysis presented in INL/EXT-???. This time we focus more on the stochastic analysis such probability of core damage and on the determination of the most risk-relevant factors. We also show some preliminary results regarding the comparison between RELAP5-3D and the new code RELAP-7 for a simplified Pressurized Water Reactors system. Lastly we present some conceptual ideas regarding the possibility to extended the RISMC capabilities from an off-line tool (i.e., as PRA analysis tool) to an online-tool. In this new configuration, RISMC capabilities can be used to assist and inform reactor operator during real accident scenarios.

  8. European Climate Change Programme. Working Group II. Impacts and Adaptation. Urban Planning and Construction. Sectoral Report

    International Nuclear Information System (INIS)

    Adaptation is a new policy area for the European Climate Change Policy. The Impacts and Adaptation Workgroup has been set up as part of European Climate Change Programme (ECCP II). The main objective of the workgroup is to explore options to improve Europe's resilience to climate change impacts, to encourage the integration of climate change adaptation into other policy areas at the European, national, regional and local level and to define the role of EU-wide policies complementing action by Member States. The aim of this initial programme of work is to identify good practice in the development of adaptation policy and foster learning from different sectoral experiences and explore a possible EU role in adaptation policies. The Commission has led a series of 10 sectoral meetings looking at adaptation issues for different sectors. One of these meetings looked at the impacts on urban planning and infrastructure in particular. This report summarises the state of play in the urban planning sector in relation to adaptation to climate change on the basis of the information gathered at the stakeholder meeting. Some of the other stakeholder meetings, such as the meeting on human health, have a strong connection with the urban planning agenda. Therefore, some actions in the sector report on adaptation and human health relate to urban planning and infrastructure considerations

  9. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmon recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.

  10. Characterization program management plan for Hanford K basin spent nuclear fuel

    International Nuclear Information System (INIS)

    The program management plan for characterization of the K Basin spent nuclear fuel was revised to incorporate corrective actions in response to SNF Project QA surveillance 1K-FY-99-060. This revision of the SNF Characterization PMP replaces Duke Eng

  11. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    Energy Technology Data Exchange (ETDEWEB)

    SCHULTZ, E.A.

    1998-10-01

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  12. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    Directory of Open Access Journals (Sweden)

    Toni L. Griffin

    2014-10-01

    Full Text Available In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and abandoned property, bringing total vacancy to roughly the size of Manhattan. In addition to physical and economic challenges, Detroiters had also acknowledged significant barriers to effective civic engagement. Foremost among these barriers were a profound sense of immobilization, planning fatigue, and a general perception of cynicism about planning and engagement efforts. These challenges were compounded by historic racial dynamics and tension. This case study elaborates on the comprehensive and innovative civic engagement executed in a citywide planning process called the Detroit Works Project, which took place from late 2010 through late 2012. For the citywide planning process to be successful and sustainable, civic leaders and project funders committed to a planning initiative that would be different from previous efforts, in large part because the “owners” of the process would be diverse and inclusive across all community sectors. The case study, written by three of the key consultants from the project, describes four key civic engagement strategies deployed in the creation of the strategic framework: (1 addressing profound challenges of culture, race, and politics by deliberately building trust; (2 elevating community expertise by fostering a sense of ownership of the process; (3 blending technical and community expertise; and (4 viewing civic engagement as an ongoing two-way conversation rather than a series of large-scale episodic events. This

  13. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    International Nuclear Information System (INIS)

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems' ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL's groundwater problems

  14. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    Science.gov (United States)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  15. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems` ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL`s groundwater problems.

  16. Monitoring plan for characterization of the Building 3019 leak site

    International Nuclear Information System (INIS)

    The Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program to provide comprehensive management of areas where past research, development, and waste management activities have resulted in residual contamination of facilities or the environment. In the winter of 1985, elevated levels of strontium-90 were detected in White Oak Creek and the ORNL sewage treatment plant. A leak was subsequently identified in a low-level waste transfer line north of Building 3019. The period of leakage and the exact chemical composition of the effluent are unknown. Two dye tests conducted at the leak site have identified several possible pathways for contaminant migration. The discovery of a solution cavity in the Chickamauga bedrock underlying the leak site and the rapid appearance of dye in the sump at Building 3042 indicate the extension of the cavity system along strike to the east. This report outlines the available published and unpublished background information pertaining to the site and proposes a monitoring plan consisting of soil sample collection and monitor well installation to provide a preliminary assessment of the types and extent of contamination at the leak site. The plan is also designed to provide additional geologic and hydrologic data for evaluating possible contaminant migration pathways. 6 refs., 10 figs., 1 tab

  17. Characterization plan for Solid Waste Storage Area 6

    International Nuclear Information System (INIS)

    Solid Waste Storage Area 6 (SWSA-6) is the only currently operating low-level radioactive waste (LLW) shallow land burial facility at the Oak Ridge National Laboratory. The US Department of Energy (DOE) recently issued DOE Order 5820.2, which provides new policy and guidelines for the management of radioactive wastes. To ensure that SWSA-6 complies with this Order it will be necessary to establish whether sufficient data on the geology, hydrology, soils, and climatology of SWSA-6 exist, and to develop plans to obtain any additional information required. It will also be necessary to establish a source term from the buried waste and provide geochemical information for hydrologic and dosimetric calculations. Where data gaps exist, methodology for obtaining this information must be developed. The purpose of this Plan is to review existing information on SWSA-6 and develop cost estimates and schedules for obtaining any required additional information. Routine operation of SWSA-6 was initiated in 1973, and it is estimated that about 29,100 m3 (1,000,000 ft3) of LLW containing about 250,000 Ci of radioactivity have been buried through 1984. Since SWSA-6 was sited prior to enactment of current disposal regulations, a detailed site survey of the geologic and hydrologic properties of the site was not performed before wastes were buried. However, during the operation of SWSA-6 some information on site characteristics has been collected

  18. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  19. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  20. Site characterization plan overview: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Consultation Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE`s repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab.

  1. Site characterization plan overview: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Consultation Draft

    International Nuclear Information System (INIS)

    The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE's repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab

  2. Plan for Characterization of K Basin Spent Nuclear Fuel (SNF) and Sludge (OCRWM)

    International Nuclear Information System (INIS)

    This is an update of the plan for the characterization of spent nuclear fuel (SNF) and sludge stored in the Hanford K West and K East Basins. The purpose of the characterization program is to provide fuel and sludge data in support of the SNF Project in the effort to remove the fuel from the K Basins and place it into dry storage. Characterization of the K Basin fuel and sludge was initiated in 1994 and has been guided by the characterization plans (Abrefah 1994, Lawrence 1995a, Lawrence 1995b) and the characterization program management plan (PMP) (Lawrence 1995c, Lawrence 1998, Trimble 1999). The fuel characterization was completed in 1999. Summaries of these activities were documented by Lawrence (1999) and Suyama (1999). Lawrence (1999) is a summary report providing a road map to the detailed documentation of the fuel characterization. Suyama (1999) provides a basis for the limited characterization sample size as it relates to supporting design limits and the operational safety envelope for the SNF Project. The continuing sludge characterization is guided by a data quality objective (DQO) (Makenas 2000) and a sampling and analysis plan (SAP) (Baker, Welsh and Makenas 2000) The original intent of the characterization program was ''to provide bounding behavior for the fuel'' (Lawrence 1995a). To accomplish this objective, a fuel characterization program was planned that would provide data to augment data from the literature. The program included in-situ examinations of the stored fuel and laboratory testing of individual elements and small samples of fuel (Lawrence 1995a). Some of the planned tests were scaled down or canceled due to the changing needs of the SNF Project. The fundamental technical basis for the process that will be used to place the K Basin fuel into dry storage was established by several key calculations. These calculations characterized nominal and bounding behavior of fuel in Multi-Canister Overpacks (MCOs) during processing and storage

  3. Working Group 1: Current plans of various organisations for lunar activities

    Science.gov (United States)

    Balsiger, H.; Pilcher, C.

    1994-01-01

    Summaries of presentations by representatives of several space agencies and the International Academy of Astronautics concerning lunar activities are presented. Participating space agencies reported two different types of lunar planning, long term planning and scenarios and lunar missions competing within regular programs. The long term plans of the various agencies look remarkably similar. They all involve a phased approach (coincidentally all incorporating four phases) and all address three prime scientific elements: science of, on, and from the Moon. The missions under consideration by the second group of agencies could readily fit as elements in the longer term program. There is great interest in lunar astronomy. There is a great deal of potential infrastructure and lunar transport capability already available. There is also a wide range of interesting technological developments that could form part of a lunar program. A well concerted and coordinated international effort could lead to an affordable program. Recommendations are: an international conference on lunar exploration should be held every other year; an electronic network should be established for the daily exchange of information; and a mechanism should be established for regular working level coordination of activities.

  4. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  5. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan

  6. Tank characterization project (TWRS) process engineering data management plan

    International Nuclear Information System (INIS)

    The Tank Characterization Data Management (TCDM) system provides customers and users with data and information of known and acceptable quality when they are needed, in the form they are needed, and at a reasonable cost. The TCDM mission will be accomplished by the following: (1) maintaining and managing tank characterization data and information based on business needs and objectives including transfer of ownership to future contractors; (2) capturing data where it originates and entering it only once to control data consistency, electronic data and information management shall be emphasized to the extent practicable; (3) establishing data quality standards, and managing and certifying databases and data sources against these standards to maintain the proper level of data and information quality consistent with the importance of the data and information, data obtained at high cost with significant implications to decision making regarding tank safety and/or disposal will be maintained and managed at the highest necessary levels of quality; (4) establishing and enforcing data management standards for the Tank Characterization Database (TCD) and supporting data sources including providing mechanisms for discovering and correcting data errors before they propagate; (5) emphasizing electronic data sharing with all authorized users, customers, contractors, and stakeholders to the extent practicable; (6) safeguarding data and information from unauthorized alteration or destruction; (7) providing standards for electronic information deliverables to subcontractors and vendors to achieve uniformity in electronic data management; and (8) investing in new technology (hardware and/or software) as prudent and necessary to accomplish the mission in an efficient and effective manner

  7. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  8. Determination of the learning needs of doctors working in the Mountain Plan in Cienfuegos province.

    Directory of Open Access Journals (Sweden)

    Manuel Fernández Urquiza

    2003-12-01

    Full Text Available Introduction: It is of great importance for the country´s educational strategy the constant studying of the staff already formed either technically or professionally . The actions within the Post graduate subsystem have been growing in organisation and maturity. The learning are determined and priorised taking into account the improving principles of the determination of the health personnel needs, the population needs and their level of satisfaction. Objectives: To carry out the diagnosis of the professional´s learning needs who are working at hospitals and consultations offices at the Turquino Plan in Cienfuegos province. Method: It is a qualitative research . The universe is formed by the staff working at the 2 hospitals and the 18 consultation offices at the Turquino Plan in Cienfuegos. The methods used are: Observation, Interviews to experts, Surveys and Group Dynamics. The techniques were applied taking into consideration David Leyva´s deductive model and Peter Park Investigation in Action. Results: learning needs were identified derived from professional competence . The Infrastructure problems that limit such competence was also defined

  9. Crack characterization for in-service inspection planning

    International Nuclear Information System (INIS)

    During in-service inspection by non destructive testing the reliability is highly dependent on how the equipment is adjusted to the specific object and to the anticipated crack feature.The crack feature and morphology vary widely between different cracking mechanisms and between material types in which the cracks appear. The major objective of this study was to characterize a number of morphology parameters for common crack mechanism and structure material combinations. Critical morphology parameters are crack orientation, shape, width, surface roughness and branching. The crack parameters were evaluated from failure analyses reported from the nuclear and non-nuclear industry. In addition, a literature review was carried out on crack parameter reports and on failure analysis reports, which were further evaluated. The evaluated crack parameters were plotted and statistically processed in data groups with respect to crack mechanism and material type. The fatigue crack mechanism were classified as mechanical, thermal or corrosion fatigue and stress corrosion crack mechanism as intergranular, transgranular or inter dendritic stress corrosion cracking. Furthermore, some common weld defects were characterized for comparison. The materials were divided into three broad groups, ferritic low alloy steels, stainless steels and nickel base alloys. The results indicate significant differences between crack parameters when comparing data from different crack mechanism/material type combinations. Typical parameter values and scatter were derived for several combinations where the data was sufficient for statistical significance. 10 refs, 105 figs, 14 tabs

  10. Demonstration testing and evaluation of in situ soil heating. Treatability study work plan (Revision 2)

    International Nuclear Information System (INIS)

    A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85 degrees to 95 degrees C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern. This document is a Treatability Study Work Plan for the demonstration program. The document contains a description of the proposed treatability study, background of the EM heating process, description of the field equipment, and demonstration test design

  11. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S ampersand M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S ampersand M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  12. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  13. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  14. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing

  15. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Heinemann, J.L.

    1997-08-13

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP.

  16. Work plan for the removal and subsequent management of specific waste from David Witherspoon, Inc., Knoxville, Tennessee

    International Nuclear Information System (INIS)

    The Tennessee Department of Environment and Conservation (TDEC) and the Department of Energy (DOE) have made the determination that approximately 258 drums of waste and 10 open-top boxes of waste now located at the site known as David Witherspoon, Inc., (DWI) in south Knoxville, Tennessee, should be repackaged as necessary and transferred to the K-25 Site in Oak Ridge, Tennessee, for management. This work plan addresses the four phases of activity planned and the methods of accomplishment The lint phase will consist of an assessment to determine requirements for managing the waste. Items to be investigated include site access, site conditions, personal protective equipment, waste characterization needs, packaging and labeling, transportation, receipt and storage of the waste at the K-25 Site, and site controls and monitoring required during the packaging operations to be conducted at DWI. The second phase will include mobilization of on-site support and operating facilities, sampling and transferral of a randomly selected representative fraction of the 232 drums now stored on-site in sea/land containers to storage facilities at the K-25 Site, and sampling of the waste now stored in the 26 drums inside the main process building and the 10 open-top boxes of waste stored outside and adjacent to the building. The third phase will include repackaging and transferral of the 26 drums and 10 boxes of waste to the K-25 Site and placement of the containerized waste into appropriate storage at the K-25 Site. Participants in the fourth phase of activity will demobilize the support and operating facilities from DWI, conduct an on-site evaluation at the K-25 site to verify compliance with storage and other management requirements, prepare a closeout report for the activity assessing the actions, and develop a plan for the final management method for the waste

  17. FY 1995 remedial investigation work plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Watkins, D.R.; Herbes, S.E. [eds.

    1994-09-01

    Field activities to support the remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) include characterization of the nature and extent of contamination in WAG 2, specifically to support risk-based remediation decisions. WAG 2 is the major drainage system downgradient of other WAGs containing significant sources of contamination at ORNL. The RI of WAG 2 is developed in three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upgradient WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate reevaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Specifically, Phase 2 activities are required to track key areas to determine if changes have occurred in WAG 2 that would require (1) interim remedial action to protect human health and the environment or (2) changes in remedial action plans and schedules for WAG2 because of changing contaminant release patterns in upslope WAGs or because of the effects of interim remedial or removal actions in other WAGs. This report defines activities to be conducted in FY 1995 for completion of the Phase 1 RI and initiation of limited Phase 2 field work.

  18. FY 1995 remedial investigation work plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Field activities to support the remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) include characterization of the nature and extent of contamination in WAG 2, specifically to support risk-based remediation decisions. WAG 2 is the major drainage system downgradient of other WAGs containing significant sources of contamination at ORNL. The RI of WAG 2 is developed in three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upgradient WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate reevaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Specifically, Phase 2 activities are required to track key areas to determine if changes have occurred in WAG 2 that would require (1) interim remedial action to protect human health and the environment or (2) changes in remedial action plans and schedules for WAG2 because of changing contaminant release patterns in upslope WAGs or because of the effects of interim remedial or removal actions in other WAGs. This report defines activities to be conducted in FY 1995 for completion of the Phase 1 RI and initiation of limited Phase 2 field work

  19. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  20. Digital Instrumentation and Control working group (DICWG) - MDEP DICWG Programme Plan 2012 2013

    International Nuclear Information System (INIS)

    The Multinational Design Evaluation Programme (MDEP) Digital Instrumentation and Controls Working Group (DICWG) was approved by MDEP's Policy Group in March 2008 and meets approximately 3 times a year. All MDEP members and the IAEA are invited to participate in this working group's activities. The DICWG's main objectives are as follows: - to document common positions in the DI and C safety systems design areas; - to harmonise and converge national codes, standards and regulatory requirements and practices in this area while recognising the sovereign rights and responsibilities of national regulators in carrying out their safety reviews of new reactor designs (see the DICWG programme plan for more details of the group's work). The DICWG interacts regularly with the following organisations: - IEC (International Electro-technical Commission) Subcommittee 45A, Instrumentation and Control of Nuclear Facilities; - IEEE (Institute of Electric and Electronics Engineers); - other organisations involved in the design of digital I and C safety systems for nuclear power plants. The DICWG reports its status to the MDEP Steering Technical Committee at the latter's thrice annual meetings. This document presents the 2012 and 2013 programme plan and its products: the Generic Common Position DICWG-02 on Software Tools; the Generic Common Position DICWG-03 on Verification and Validation throughout the Life Cycle of Safety Systems Using Digital Computers; the Generic Common Position DICWG-04 on Communication Independence; the Generic Common Position DICWG-05 on Treatment of Hardware Description Language (HDL) Programmed Devices for Use in Nuclear Safety Systems; the Generic Common Position DICWG-06 on Simplicity in Design; the Generic Common Position DICWG-08 on Impact of Cyber Security Features on Digital I and C Safety Systems

  1. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  2. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to

  3. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to

  4. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  5. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  6. National Wildlife Refuge System Inventory and Monitoring Regional Annual Work Plan : Mountain-Prairie Region 6 Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 6 discusses the goals and objectives of the Inventory and Monitoring IM program for fiscal year 2012. The introduction includes the...

  7. Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200­-SW­-2 Operable Unit at the U.S. Department of Energy’s Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Christian D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nimmons, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-09-01

    A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200­SW­1 and 200­SW­2 Collaborative Workshops-Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

  8. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    International Nuclear Information System (INIS)

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ''scores'' and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process

  9. 华盛顿核安全峰会工作计划%Work Plan of Washington Nuclear Security Summit

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    @@ This Work Plan supports the Communiqué of the Washington Nuclear Security Summit.It constitutes a political commitlnent bv the participating states to catty out,on a voluntary basis,applicable portions of this Work Plan,consistent with respective national laws and intemational obligations,in all aspects of the storage,use,transportation and disposal of uclear materials and in preventing non-state actors from obtaining the information required to use such materials for malicious purposes.

  10. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  11. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  12. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  13. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  14. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    Science.gov (United States)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  15. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  16. Site observational work plan for the UMTRA Project site at Falls City, Texas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

  17. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  18. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  19. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  20. Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Hayse, J.; Kuperman, R. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [and others

    1995-03-01

    The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct an ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.

  1. The Removal Action Work Plan for CPP-603A Basin Facility

    Energy Technology Data Exchange (ETDEWEB)

    B. T. Richards

    2006-06-05

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center.

  2. 111-B Metal Examination Facility Concrete Tanks Characterization Plan

    International Nuclear Information System (INIS)

    The 111-B Metal Examination Facility was a single-story, wood frame 'L'-shaped building built on a concrete floor slab. The facility served as a fuel failure inspection facility. Irradiated fuel pieces were stored and examined in two below grade concrete storage tanks filled with water. The tanks have been filled with grout to stabilize the contamination they contained, and overall dimensions are 5 ft 9 in. (1.5 m 22.8 cm ) wide, 9 ft 1 in. (2.7 m 2.54 cm ) deep, and 10 ft 8 in. (3.0 m 20.32 cm) long, and are estimated to weigh 39 tons. The tanks were used to store and examine failed fuel rods, using water as a radiation shield. The tanks were lined with stainless steel; however, drawings show the liner has been removed from at least one tank (south tank) and was partially filled with grout. The south tank was used to contain the Sample Storage Facility, a multi-level metal storage rack for failed nuclear fuel rods (shown in drawings H-1-2889 and -2890). Both tanks were completely grouted sometime before decontamination and demolition (D ampersand D) of the above ground facility in 1984. The 111-B Metal Examination Facility contained two concrete tanks located below floor level for storage and examination of failed fuel. The tanks were filled with concrete as part of decommissioning the facility prior to 1983 (see Appendix A for description of previous work). Funding for removal and disposal of the tanks ran out before they could be properly disposed

  3. Work.

    Science.gov (United States)

    Haines, Annette M.

    2003-01-01

    Draws upon Maria Montessori's writings to examine work as a universal human tendency throughout life. Discusses the work of adaptation of the infant, work of "psycho-muscular organism" for the preschooler, work of the imagination for the elementary child, community work of the adolescent, and work of the adult. Asserts that Montessorians' role is…

  4. RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1

    International Nuclear Information System (INIS)

    This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988

  5. Accuracy characterization and measurement point planning for workpiece localization

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    [1]Ding, H., Zhu, L. M., Xiong, Z. H., A survey on coordinate measurement, geometric modeling and PR or NC code generation from measured data points, Chinese Journal of Mechanical Engineering, 2003, 39(11): 28-37.[2]Zhu, L. M., Xiong, Z. H., Ding, H. et al., A distance function based approach for localization and profile error evaluation of complex surface, Transactions of ASME, Journal of Manufacturing Science & Engineering, 2004, 126(3): 542-554.[3]Zhu, L. M., Ding, H., Application of kinematic geometry to computational metrology: distance function based heirarchical algorithms for cylindricity evaluation, International Journal of Machine Tools & Manufacture, 2003, 43(2): 203-215.[4]Li, Z., Gou, J., Chu, Y., Geometric algorithms for workpiece localization, IEEE Transactions on Robotics and Automation, 1998, 14: 864-878.[5]Sourlier, D., Bucher, A., Surface-independent, theoretically exact bestfit for arbitrary sculptured, complex, or standard geometries, Precision Engineering, 1995, 17: 101-113.[6]Forbes, A. B., Least-squares best-fit geometric elements, in Algorithms for Approximation II (ed. Mason, J. C., Cox, M. G.), London: Chapman and Hall, 1990, 311-319.[7]Hong, J. W., Tan, X. L., Method and apparatus for determining position and orientation of mechanical objects, U.S. Patent 5208763, 1990.[8]Yan, Z. C., Meng, C. H., Uncertainty analysis and variation reduction of three-dimensional coordinate metrology, International Journal of Machine Tools & Manufacture, 1999, 39: 1199-1261.[9]Yau, H. T., Uncertainty analysis in geometric best fit, International Journal of Machine Tools and Manufacture, 1998, 38: 1323-1342.[10]Murray, R. M., Li, Z., Sastry, S. S., A Mathematical Introduction to Robotic Manipulation, Boca Raton: CRC Press, 1994.[11]Wang, M. Y., Characterizations of localization accuracy of fixtures, IEEE Transactions on Robotics and Automation, 2002, 18(6): 976-981.[12]Chu, Y. X., Gou, J. B., Li, Z. X

  6. State of work for services provided by the Waste Sampling and Characterization Facility for effluent monitoring

    International Nuclear Information System (INIS)

    This document defines the services the Waste Sampling and Characterization Facility (WSCF) shall provide Effluent Monitoring (EM) throughout the calendar year for analysis. The internal memo contained in Appendix A identifies the samples Em plans to submit for analysis in CY-1995. Analysis of effluent (liquid and air discharges) and environmental (air, liquid, animal, and vegetative) samples is required using standard laboratory procedures, in accordance with regulatory and control requirements. This report describes regulatory reporting requirements and WSCF services and data quality objectives

  7. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index

    International Nuclear Information System (INIS)

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE's Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules

  8. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

  9. Task Technical and Quality Assurance Plan for the Characterization of Tank 25F Saltcake Core Samples

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) recognizes the need for the characterization of High-Level Waste (HLW) saltcake in the Savannah River Site (SRS) F- and H-area tank farms to support upcoming salt processing activities. As part of the enhanced characterization efforts, Tank 25F will be sampled and the samples analyzed at the Savannah River National Laboratory (SRNL). This Task Technical and Quality Assurance Plan documents the planned activities for the physical, chemical, and radiological analysis of the Tank 25F saltcake core samples. This plan does not cover other characterization activities that do not involve core sample analysis and it does not address issues regarding sampling or sample transportation. The objectives of this report are: (1) Provide information useful in projecting the composition of dissolved salt batches by quantifying important components (such as actinides, 137Cs, and 90Sr) on a per batch basis. This will assist in process selection for the treatment of salt batches and provide data for the validation of dissolution modeling. (2) Determine the properties of the heel resulting from dissolution of the bulk saltcake. Also note tendencies toward post-mixing precipitation. (3) Provide a basis for determining the number of samples needed for the characterization of future saltcake tanks. Gather information useful towards performing characterization in a manner that is more cost and time effective

  10. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  11. Annual Habitat Work Plan – 2003 : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River National Wildlife Refuge is currently developing a habitat management plan for its management. The Refuge finalized a master plan in 1986; however,...

  12. Annual Habitat Work Plan – 2004 : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River Refuge is currently developing a Habitat Management Plan, and expects a final HMP by fall of 2005. The Refuge finalized a master plan in 1986; however,...

  13. An Integrated Work Force Planning Strategy For The Health Services 2009 - 2012

    OpenAIRE

    Department of Health and Children

    2009-01-01

    Workforce planning identifies the composition of the workforce required to deliver health service goals. It encompasses a range of human resource activities aimed at the short, medium and long-term. Workforce planning that is integrated with service and financial planning offers the best opportunity for linking human resource decisions to the strategic goals for the health services. Systems and structures are required to support and develop workforce planning activities

  14. Integration of Nevada Test Site (NTS) Work Control Programs and Incorporating Integrated Safety Management (ISM) into Activity Level Work Planning and Control

    International Nuclear Information System (INIS)

    This session will examine a method developed by Federal and Contractor personnel at the Nevada Site Office (NSO) to improve the planning and execution of work activities utilizing an Activity Level Work Control process in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations. The process was initially developed during Fiscal Year (FY) 2007, and implementation is commencing during the fourth quarter of FY 2008. This process will significantly enhance the flexibility and the appropriate rigor in the performance of work activities

  15. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act

    International Nuclear Information System (INIS)

    Chapter six describes the basis for facility design, the completed facility conceptual design, the completed analytical work relating to the resolution of design issues, and future design-related work. The basis for design and the conceptual design information presented in this chapter meet the requiremenrs of the Nuclear Waste Policy Act of 1982, for a conceptual repository design that takes into account site-specific requirements. This information is presented to permit a critical evaluation of planned site characterization activities. Chapter seven describes waste package components, emplacement environment, design, and status of research and development that support the Nevada Nuclear Waste Storage Investigation (NNWSI) Project. The site characterization plan (SCP) discussion of waste package components is contained entirely within this chapter. The discussion of emplacement environment in this chapter is limited to considerations of the environment that influence, or which may influence, if perturbed, the waste packages and their performance (particularly hydrogeology, geochemistry, and borehole stability). The basis for conceptual waste package design as well as a description of the design is included in this chapter. The complete design will be reported in the advanced conceptual design (ACD) report and is not duplicated in the SCP. 367 refs., 173 figs., 68 tabs

  16. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    Chapter six describes the basis for facility design, the completed facility conceptual design, the completed analytical work relating to the resolution of design issues, and future design-related work. The basis for design and the conceptual design information presented in this chapter meet the requirements of the Nuclear Waste Policy Act of 1982, for a conceptual repository design that takes into account site-specific requirements. This information is presented to permit a critical evaluation of planned site characterization activities. Chapter seven describes waste package components, emplacement environment, design, and status of research and development that support the Nevada Nuclear Waste Storage Investigation (NNWSI) Project. The site characterization plan (SCP) discussion of waste package components is contained entirely within this chapter. The discussion of emplacement environment in this chapter is limited to considerations of the environment that influence, or which may influence, if perturbed, the waste packages and their performance (particularly hydrogeology, geochemistry, and borehole stability). The basis for conceptual waste package design as well as a description of the design is included in this chapter. The complete design will be reported in the advanced conceptual design (ACD) report and is not duplicated in the SCP. 367 refs., 173 figs., 68 tabs.

  17. Microstructural Characterization and Mechanical Performance of Hot Work Tool Steel Processed by Selective Laser Melting

    Science.gov (United States)

    Holzweissig, Martin Joachim; Taube, Alexander; Brenne, Florian; Schaper, Mirko; Niendorf, Thomas

    2015-04-01

    Microstructural characterization of hot work tool steel processed by selective laser melting was carried out. The findings shed light on the interrelationship between processing parameters and the microstructural evolution. It was found that the microstructure after layer-wise processing partially consists of metastable-retained austenite which transforms to martensite in a subsequent tensile test. This improves the mechanical properties of the hot work tool steel enabling direct application.

  18. Technical know-how relevant to planning of borehole investigation for fault characterization

    Science.gov (United States)

    Mizuno, T.; Takeuchi, R.; Tsuruta, T.; Matsuoka, T.; Kunimaru, T.; Saegusa, H.

    2011-12-01

    As part of the national R&D program for geological disposal of high-level radioactive waste (HLW), the broad scientific study of the deep geological environment, JAEA has established the Mizunami Underground Research Laboratory (MIU) in Central Japan as a generic underground research laboratory (URL) facility. The MIU Project focuses on the crystalline rocks. In the case of fractured rock, a fault is one of the major discontinuity structures which control the groundwater flow conditions. It is important to estimate geological, hydrogeological, hydrochemical and rock mechanical characteristics of faults, and then to evaluate its role in the engineering design of repository and the assessment of long-term safety of HLW disposal. Therefore, investigations for fault characterization have been performed to estimate its characteristics and to evaluate existing conceptual and/or numerical models of the geological environment in the MIU project. Investigations related to faults have been conducted based on the conventional concept that a fault consists of a "fault core (FC)" characterized by distribution of the faulted rocks and a "fractured zone (FZ)" along FC. With the progress of investigations, furthermore, it is clear that there is also a case in which an "altered zone (AZ)" characterized by alteration of host rocks to clay minerals can be developed around the FC. Intensity of alteration in AZ generally decreases with distance from the FC, and AZ transits to FZ. Therefore, the investigation program focusing on properties of AZ is required for revising the existing conceptual and/or numerical models of geological environment. In this study, procedures for planning of fault characterizations have been summarized based on the technical know-how learnt through the MIU Project for the development of Knowledge Management System performed by JAEA under a contract with the Ministry of Economy, Trade and Industry as part of its R&D supporting program for developing geological

  19. The Palau AHEC--academizing the public health work plan: capacity development and innovation in Micronesia.

    Science.gov (United States)

    Dever, Greg; Finau, Sitaleki; Kuartei, Stevenson; Durand, A Mark; Rykken, David; Yano, Victor; Untalan, Pedro; Withy, Kelley; Tellei, Patrick; Baravilala, Wame; Pierantozzi, Sandra; Tellei, Jullie

    2005-03-01

    The Palau Area Health Education Center (AHEC)--a program of the University of Hawaii's John A. Burns School of Medicine (JABSOM) and based at Palau Community College--was established in 2001 in response to the recommendations of the 1998 Institute of Medicine (IOM) report--Pacific Partnerships for Health--Charting a New Course for the 21st Century1. One of IOM's core recommendations was to promote the training of the primary health care workforce among the U.S.-Associated Pacific Islands. Since its inception in 2001, the Palau AHEC has coordinated overall 37 postgraduate and undergraduate courses in General Practice and Public Health taught by the University of Auckland Faculty of Medicine and Health Sciences and the Fiji School of Medicine's School of Public Health and Primary Care (SPH&PC) in Palau, Yap State, and the Republic of the Marshall Islands. Currently 139 physicians, nurses, health administrators, and environmental health workers are registered as active students in Palau (58), Yap State (22), and the RMI (59). Notably, the Palau AHEC and the SPH&PC have worked in an innovative partnership with the Palau Ministry of Health to operationalize the MOH's public health work plan to implement a comprehensive community health survey of all 4,376 households in Palau, interviewing 79% of the total population, to determine Palau's health indicators. To accomplish this, the SPH&PC developed and taught a curriculum for Palau physicians and public health nurses on how to design the survey, gather, and analyze data in order to develop and implement appropriately responsive intervention and treatment programs to address Palau's old and newer morbidities. In early FY2005, two other Micronesian AHECs--the Yap State and Commonwealth of the Northern Mariana Islands AHECs--were funded through JABSOM administered grants which will also address the primary care training needs of Micronesia's remote and isolated health workforce. PMID:18181474

  20. NRC staff site characterization analysis of the Department of Energy's Site Characterization Plan, Yucca Mountain Site, Nevada

    International Nuclear Information System (INIS)

    This Site Characterization Analysis (SCA) documents the NRC staff's concerns resulting from its review of the US Department of Energy's (DOE's) Site Characterization Plan (SCP) for the Yucca Mountain site in southern Nevada, which is the candidate site selected for characterization as the nation's first geologic repository for high-level radioactive waste. DOE's SCP explains how DOE plans to obtain the information necessary to determine the suitability of the Yucca Mountain site for a repository. NRC's specific objections related to the SCP, and major comments and recommendations on the various parts of DOE's program, are presented in SCA Section 2, Director's Comments and Recommendations. Section 3 contains summaries of the NRC staff's concerns for each specific program, and Section 4 contains NRC staff point papers which set forth in greater detail particular staff concerns regarding DOE's program. Appendix A presents NRC staff evaluations of those NRC staff Consultation Draft SCP concerns that NRC considers resolved on the basis of the SCP. This SCA fulfills NRC's responsibilities with respect to DOE's SCP as specified by the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18. 192 refs., 2 tabs

  1. NRC staff site characterization analysis of the Department of Energy`s Site Characterization Plan, Yucca Mountain Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-08-01

    This Site Characterization Analysis (SCA) documents the NRC staff`s concerns resulting from its review of the US Department of Energy`s (DOE`s) Site Characterization Plan (SCP) for the Yucca Mountain site in southern Nevada, which is the candidate site selected for characterization as the nation`s first geologic repository for high-level radioactive waste. DOE`s SCP explains how DOE plans to obtain the information necessary to determine the suitability of the Yucca Mountain site for a repository. NRC`s specific objections related to the SCP, and major comments and recommendations on the various parts of DOE`s program, are presented in SCA Section 2, Director`s Comments and Recommendations. Section 3 contains summaries of the NRC staff`s concerns for each specific program, and Section 4 contains NRC staff point papers which set forth in greater detail particular staff concerns regarding DOE`s program. Appendix A presents NRC staff evaluations of those NRC staff Consultation Draft SCP concerns that NRC considers resolved on the basis of the SCP. This SCA fulfills NRC`s responsibilities with respect to DOE`s SCP as specified by the Nuclear Waste Policy Act (NWPA) and 10 CFR 60.18. 192 refs., 2 tabs.

  2. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-05-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

  3. Status of the conversion working plan in the High Flux Reactor (Petten, The Netherlands)

    International Nuclear Information System (INIS)

    The conversion from HEU to LEU has often many disadvantages: flux penalties, increase of fuel consumption, cost and delay to obtain a new license etc. But to fulfill the non-proliferation programme, and to simplify the future fuel supply, the HFR renewed in 1998 studies on conversion possibilities. To minimize the conversion costs, these studies were made with a progressive conversion that avoids the need of one new core and permits to begin the conversion with a replacement of 5 elements at each cycle. Hence the conversion can be made in 7 cycles, without special elements and with a normal bum-up for each element. To avoid an increase of fuel consumption, an increase of the fuel cycle length from 24.7 to 28.3 days was also considered. This point allows reducing the number of annual cycles from 1 to 10 and enables in one cycle to have the possibility of four successive irradiations for Molybdenum production (7 days) in one irradiation position. A working plan for fuel licensing has been sent to the safety authorities and is presented in the paper. (author)

  4. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    International Nuclear Information System (INIS)

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA

  5. Hypersensitivity to electricity: working definition and additional characterization of the syndrome.

    Science.gov (United States)

    Hillert, L; Hedman, B K; Söderman, E; Arnetz, B B

    1999-11-01

    Those who believe that electric appliances trigger adverse symptoms have coined the label hypersensitivity to electricity. Scientific research has not been able to identify a direct link between electromagnetic fields and symptoms, and no diagnostic criteria exist. Groups with reported hypersensitivity are very heterogeneous. A need exists for an operational working definition and improved characterization of groups. We report an investigation of symptoms and risk indicators associated with reported hypersensitivity to electricity-based on a survey at a high-technology, multinational telecommunications corporation. Comparisons are also made with patients referred to a university department of occupational and environmental health. No association was found between specific psychosocial work characteristics nor personal traits and hypersensitivity to electricity. We present skin and neurovegetative symptom indices. Results indicate that skin, and not neurovegetative symptoms, characterize the syndrome, at least during the first years of illness. For characterization, we propose a set of dimensions, including triggering factors, behavior, and duration of symptoms. PMID:10624841

  6. Contribution of reactive and proactive control to children's working memory performance: Insight from item recall durations in response sequence planning.

    Science.gov (United States)

    Chevalier, Nicolas; James, Tiffany D; Wiebe, Sandra A; Nelson, Jennifer Mize; Espy, Kimberly Andrews

    2014-07-01

    The present study addressed whether developmental improvement in working memory span task performance relies upon a growing ability to proactively plan response sequences during childhood. Two hundred thirteen children completed a working memory span task in which they used a touchscreen to reproduce orally presented sequences of animal names. Children were assessed longitudinally at 7 time points between 3 and 10 years of age. Twenty-one young adults also completed the same task. Proactive response sequence planning was assessed by comparing recall durations for the 1st item (preparatory interval) and subsequent items. At preschool age, the preparatory interval was generally shorter than subsequent item recall durations, whereas it was systematically longer during elementary school and in adults. Although children mostly approached the task reactively at preschool, they proactively planned response sequences with increasing efficiency from age 7 on, like adults. These findings clarify the nature of the changes in executive control that support working memory performance with age. PMID:24773104

  7. [How to promote birth planning in the wake of transfer of agricultural production responsibility to the work crew].

    Science.gov (United States)

    1981-04-01

    Mianzhu County is among Sichuan Province's more successful counties in family planning. Following Marx's theory of the 2-fold character of production, Mianzhu County in 1980 simultaneously transferred both agricultural production and family planning work to the work crew by implementing "double transfer of responsiblity," thereby mobilizing cadres and people to understand both time material production and human reproduction, i.e., "grains, money and people." Last year when the agricultural production responsiblity system was established and production was contracted to the work crew, it was decided to transfer both production and birth quotas to the work crew through a system of monetary rewards for sucessful family planning and fines for unplanned births. Results from the double responsiblity system show that: the grain production kept up with 1979 levels; the rate of natural population increase dropped from 1979's 4.1/1000 to 1.57/1000 in 1980; the single-child family rate was 94%; the multiple child family rate was .3/1000; the rate of applications for the Single Child Certificate was 97.5%. At first the work crew felt that their repsonsibility was production and that family planning was a personal matter. But after extensive propaganda efforts to teach Marxist population theory and to stress the need to control population, the work crew realized that family planning is everyone's concern just as production is everyone's concern. With the "double transfer or responsiblity," the working relationship among communes, production brigades, production teams, and work crews improved, and advocacy of the single-child family was strengthened and expanded. PMID:12266520

  8. Technical Work Plan for: Near Field Environment: Engineered System: Radionuclide Transport Abstraction Model Report

    Energy Technology Data Exchange (ETDEWEB)

    J.D. Schreiber

    2006-12-08

    This technical work plan (TWP) describes work activities to be performed by the Near-Field Environment Team. The objective of the work scope covered by this TWP is to generate Revision 03 of EBS Radionuclide Transport Abstraction, referred to herein as the radionuclide transport abstraction (RTA) report. The RTA report is being revised primarily to address condition reports (CRs), to address issues identified by the Independent Validation Review Team (IVRT), to address the potential impact of transport, aging, and disposal (TAD) canister design on transport models, and to ensure integration with other models that are closely associated with the RTA report and being developed or revised in other analysis/model reports in response to IVRT comments. The RTA report will be developed in accordance with the most current version of LP-SIII.10Q-BSC and will reflect current administrative procedures (LP-3.15Q-BSC, ''Managing Technical Product Inputs''; LP-SIII.2Q-BSC, ''Qualification of Unqualified Data''; etc.), and will develop related Document Input Reference System (DIRS) reports and data qualifications as applicable in accordance with prevailing procedures. The RTA report consists of three models: the engineered barrier system (EBS) flow model, the EBS transport model, and the EBS-unsaturated zone (UZ) interface model. The flux-splitting submodel in the EBS flow model will change, so the EBS flow model will be validated again. The EBS transport model and validation of the model will be substantially revised in Revision 03 of the RTA report, which is the main subject of this TWP. The EBS-UZ interface model may be changed in Revision 03 of the RTA report due to changes in the conceptualization of the UZ transport abstraction model (a particle tracker transport model based on the discrete fracture transfer function will be used instead of the dual-continuum transport model previously used). Validation of the EBS-UZ interface model

  9. Low-level waste characterization plan for the WSCF Laboratory Complex

    International Nuclear Information System (INIS)

    The Waste Characterization Plan for the Waste Sampling and Characterization Facility (WSCF) complex describes the organization and methodology for characterization of all waste streams that are transferred from the WSCF Laboratory Complex to the Hanford Site 200 Areas Storage and Disposal Facilities. Waste generated at the WSCF complex typically originates from analytical or radiological procedures. Process knowledge is derived from these operations and should be considered an accurate description of WSCF generated waste. Sample contribution is accounted for in the laboratory waste designation process and unused or excess samples are returned to the originator for disposal. The report describes procedures and processes common to all waste streams; individual waste streams; and radionuclide characterization methodology

  10. The sequential encoding of competing action goals involves dynamic restructuring of motor plans in working memory.

    Science.gov (United States)

    Gallivan, Jason P; Bowman, Natasha A R; Chapman, Craig S; Wolpert, Daniel M; Flanagan, J Randall

    2016-06-01

    Recent neural and behavioral findings provide support for the influential idea that in situations in which multiple action options are presented simultaneously, we prepare action plans for each competing option before deciding between and executing one of those plans. However, in natural, everyday environments, our available action options frequently change from one moment to the next, and there is often uncertainty as to whether additional options will become available before having to select a particular course of action. Here, with the use of a target-directed reaching task, we show that in this situation, the brain specifies a competing action for each new, sequentially presented potential target and that recently formed action plans can be revisited and updated so as to conform with separate, more newly developed, plans. These findings indicate that the brain forms labile motor plans for sequentially arising target options that can be flexibly restructured to accommodate new motor plans. PMID:27030738

  11. Kinetic characterization and of recrystallization of the aluminum alloy 6063 after S work hardening treatment

    International Nuclear Information System (INIS)

    The aluminum 6063 alloy possesses a great industrial interest, presenting characteristics that justify its frequent use, when compared to the other aluminum alloys: the precipitation hardening and high cold work capacity. These alloys present high ductility, that allows their use in operations with high deformation degrees, as the cold work. The objective of this work is to show comparative analysis of the hardness Vickers of the commercial aluminum 6063 alloy, after cold work with different area reduction degree and thermal treatment. Considering the frequent utilization aluminium 6063 alloy, this work studies the characterization and recrystallization of this alloy, after the plastic deformation in different area reduction degrees, thermal treatment and convenient treatment times - Thermo mechanic Treatments. (author)

  12. Site Characterization Plan for the Old Hydrofracture Facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    The aboveground structures of the Old Hydrofracture Facility (OHF) at Oak Ridge National Laboratory (ORNL) are scheduled for decontamination and decommissioning (D ampersand D). This Site Characterization Plan presents the strategy and techniques to be used to characterize the OHF D ampersand D structures in support of D ampersand D planning, design, and implementation. OHF is located approximately 1 mile southwest of the main ORNL complex. From 1964 to 1979, OHF was used in the development and full-scale application of hydrofracture operations in which 969,000 gal of liquid low-level waste (LLLW) was mixed with grout and then injected under high pressure into a low-permeability shale formation approximately 1/6 mile underground

  13. Quality Assurance Plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    This quality assurance plan summarizes requirements for conducting work on the Upper East 9 Fork Poplar Creek (UEFPC) Characterization Area (CA). The reader is referred to the Expanded Task Work Agreement for Upper East Fork Poplar Creek Characterization Area, Remedial Investigation/Feasibility Study (RI/FS) for details regarding the activities, roles, and responsibilities summarized here. UEFPC is designated a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site and thus requires a remedial investigation (RI) and a feasibility study (FS). The RI objectives are to evaluate the nature and extent of known and suspected contaminates, to provide data to perform baseline ecological and human health risk assessments, and to support development and evaluation of remedial alternatives for the FS,. Existing data will be used as much as possible. Additional sampling may be required to fill data gaps. The goal of the RI is to prioritize the major sources of contaminants to exit pathways and to understand their characteristics for risk characterization and development of remedial alternatives. The FS objectives are to investigate technologies and develop and evaluate alternatives based on 2031 CERCLA guidance

  14. Statistical characterization of deviations from planned flight trajectories in air traffic management

    CERN Document Server

    Bongiorno, C; Lillo, F; Mantegna, R N; Miccichè, S

    2016-01-01

    Understanding the relation between planned and realized flight trajectories and the determinants of flight deviations is of great importance in air traffic management. In this paper we perform an in depth investigation of the statistical properties of planned and realized air traffic on the German airspace during a 28 day periods, corresponding to an AIRAC cycle. We find that realized trajectories are on average shorter than planned ones and this effect is stronger during night-time than daytime. Flights are more frequently deviated close to the departure airport and at a relatively large angle to destination. Moreover, the probability of a deviation is higher in low traffic phases. All these evidences indicate that deviations are mostly used by controllers to give directs to flights when traffic conditions allow it. Finally we introduce a new metric, termed difork, which is able to characterize navigation points according to the likelihood that a deviation occurs there. Difork allows to identify in a statist...

  15. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  16. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  17. Planning, Management and Evaluation: Realizing PIC Potential. Private Industry Council Guide. Working Draft.

    Science.gov (United States)

    National Alliance of Business, Inc., Washington, DC.

    This Planning, Management, and Evaluation (PME) guide was developed by the National Alliance of Business as part of its program of management assistance for Private Industry Councils (PICs). The guide is a tool which PICs can use to improve their capability to plan, manage, and evaluate the programs which they administer, and to establish locally…

  18. Site study plan for borehole search and characterization, Deaf Smith County Site, Texas: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1987-12-22

    This site study plan describes the Borehole Search and Characterization field activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field program has been designed to provide data useful in addressing information/data needs resulting from Federal/State/Local regulatory requirements and repository program requirements. Air and ground surveys, an extensive literature search, and landowner interviews will be conducted to locate wells within and adjacent to the proposed nuclear waste repository site in Deaf Smith County. Initially, the study will center around the planned Exploratory Shaft Facilities location and will expand outward from that location. Findings from this study may lead to preparation of a new site study plan to search suspected borehole locations, and excavate or reenter known boreholes for additional characterization or remedial action. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technical Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 13 refs., 6 figs., 3 tabs.

  19. Site study plan for borehole search and characterization, Deaf Smith County Site, Texas: Revision 1

    International Nuclear Information System (INIS)

    This site study plan describes the Borehole Search and Characterization field activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field program has been designed to provide data useful in addressing information/data needs resulting from Federal/State/Local regulatory requirements and repository program requirements. Air and ground surveys, an extensive literature search, and landowner interviews will be conducted to locate wells within and adjacent to the proposed nuclear waste repository site in Deaf Smith County. Initially, the study will center around the planned Exploratory Shaft Facilities location and will expand outward from that location. Findings from this study may lead to preparation of a new site study plan to search suspected borehole locations, and excavate or reenter known boreholes for additional characterization or remedial action. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technical Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 13 refs., 6 figs., 3 tabs

  20. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.

  1. The Application of Factor Analysis to Determine the Parameters of Planning Work-Zone in the Road Repair and Maintenance

    OpenAIRE

    Mohammad Mehdi Khabiri

    2016-01-01

    Building and maintaining transport infrastructure is essential for economic and social development of each country. The high costs of repair and maintenance of the existing road networks required to manage the road repair and maintenance and systematic planning for this process. The scope of where the operational performance of road repair and maintenance are carried is called work zone. The measures are carried in the work zone caused traffic and increased the likelihood of traffic accidents...

  2. Contribution of reactive and proactive control to children's working memory performance: Insight from item recall durations in response sequence planning

    OpenAIRE

    Chevalier, Nicolas; James, Tiffany D.; Wiebe, Sandra A.; Nelson, Jennifer Mize; Espy, Kimberly Andrews

    2014-01-01

    The present study addressed whether developmental improvement in working memory span task performance relies upon a growing ability to proactively plan response sequences during childhood. 213 children completed a working memory span task in which they used a touchscreen to reproduce orally presented sequences of animal names. Children were assessed longitudinally at seven time points between 3 and 10 years of age, and 21 young adults completed the same task. Proactive response sequence plann...

  3. Identification and characterization of conservative organic tracers for use as hydrologic tracers for the Yucca Mountain site characterization project: Quality Assurance Project Plan, Revision 1

    International Nuclear Information System (INIS)

    The purpose of this work is to identify and characterize candidate conservative organic tracers for use as hydrologic tracers for experiments to be conducted at the Yucca Mountain C-well complex. During this quarter the main effort was directed towards rewriting the quality assurance program in preparation for a review and audit by the USGS. However, due to budget constraints the review and audit were not carried out. The tracer QA plan and standard operating procedures (SOPs) were revised and copies are included in the report. Instrumental problems were encountered and corrected with the addition of new integration and sample control software. In the sampling, there was an unexplained peak in the chromatograms of the tracers being tested in the light tuff. This was not correctable and these experiments will be repeated in the next quarter

  4. Final work plan : supplemental upward vapor intrusion investigation at the former CCC/USDA grain storage facility in Hanover, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-12-15

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of the city of Hanover, Kansas, from 1950 until the early 1970s. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In February 1998, trace to low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5.0 {micro}g/L) were detected in two private wells near the former grain storage facility at Hanover, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. In 2007, the CCC/USDA conducted near-surface soil sampling at 61 locations and also sampled indoor air at nine residences on or adjacent to its former Hanover facility to address the residents concerns regarding vapor intrusion. Low levels of carbon tetrachloride were detected at four of the nine homes. The results were submitted to the KDHE in October 2007 (Argonne 2007). On the basis of the results, the KDHE requested sub-slab sampling and/or indoor air sampling (KDHE 2007). This Work Plan describes, in detail, the proposed additional scope of work requested by the KDHE and has been developed as a supplement to the comprehensive site investigation work plan that is pending (Argonne 2008). Indoor air samples collected previously from four homes at Hanover were shown to contain the carbon tetrachloride at low concentrations (Table 2.1). It cannot be concluded from these previous data that the source of the detected carbon tetrachloride is vapor intrusion attributable to former grain storage operations of the CCC/USDA at Hanover. The technical objective of the vapor intrusion investigation described here is to assess the risk to human health due to the potential for upward migration of carbon tetrachloride and

  5. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  6. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    International Nuclear Information System (INIS)

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted

  7. Technology Partnership Organization: Quality Work Force Planning in East Texas. Final Report for Project Year 1990-1991.

    Science.gov (United States)

    Fabac, John N.

    The Technology Partnership Organization (TPO) is one of 24 Quality Work Force Planning (QWFP) entities in Texas. The TPO met its objectives through a variety of activities, including the following: (1) establishing a QWFP committee for the region; (2) providing an inventory of key regional industries with the greatest job opening potential and…

  8. Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab.

  9. Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 15 figs., 1 tab

  10. Working together on automated vehicle guidance AVG : preliminary business plan, abridged version.

    NARCIS (Netherlands)

    Awareness (ed.)

    1998-01-01

    This plan describes the questions which will have to be answered in the short term, and the action which need to be taken in a phased and structured manner to gain insight into the potential of automated vehicle guidance (AVG).

  11. 2009-2010 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 2006, Parker River NWR completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years....

  12. 2006-07 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River NWR recently completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years....

  13. Geology of Libya Montes and the Interbasin Plains of Northern Tyrrhena Terra, Mars: Project Introduction and First Year Work Plan

    Science.gov (United States)

    Skiner, J. A., Jr.; Rogers, A. D.; Seelos, K. D.

    2009-01-01

    The highland-lowland boundary (HLB) of Mars is interpreted to be a complex tectonic and erosional transition that may hold evidence for past geologic processes and environments. The HLB-abutting margin of the Libya Montes and the interbasin plains of northern Tyrrhena Terra display an exceptional view of the earliest to middle history of Mars that has yet to be fully characterized. This region contains some of the oldest exposed materials on the Martian surface as well as aqueous mineral signatures that may be potential chemical artifacts of early highland formational processes. However, a full understanding of the regions geologic and stratigraphic evolution is remarkably lacking. Some outstanding questions regarding the geologic evolution of Libya Montes and northern Tyrrhena Terra in-clude: Does combining geomorphology and composition advance our understanding of the region s evolution? Can highland materials be subdivided into stratigraphically discrete rock and sediment sequences? What do major physiographic transitions imply about the balanced tectonism, climate change, and erosion? Where is the erosional origin and what is the post-depositional history of channel and plains units? When and in what types of environments did aqueous mineral signatures arise? This abstract introduces the geologic setting, science rationale, and first year work plan of a recently-funded 4-year geologic mapping proposal (project year = calendar year). The objective is to delineate the geologic evolution of Libya Montes and northern Tyrrhena Terra at 1:1M scale using both classical geomorphological and compositional mapping techniques. The funded quadrangles are MTMs 00282, -05282, -10282, 00277, -05277, and -10277.

  14. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs.

  15. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    International Nuclear Information System (INIS)

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs

  16. The association between psychosocial work environment, attitudes towards older workers (ageism) and planned retirement

    DEFF Research Database (Denmark)

    Thorsen, Sannie; Rugulies, Reiner; Løngaard, Katja;

    2012-01-01

    The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account.......The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account....

  17. The challenge of climate change adaptation in urban planning. FINADAPT Working Paper 13

    OpenAIRE

    Peltonen, Lasse; HaanpÀÀ, Simo; Lehtonen, Samuli

    2005-01-01

    Based on a literature review and a series of round-table discussions with actors engaged in urban planning, this paper addresses adaptation issues relevant in urban planning. Different adaptation challenges are discussed, together with aspects of vulnerability such as awareness, geographical context, institutional frames and organisational capacities. The round table discussions took place in three different locations in Finland, reflecting different geographical and socio-economical conditio...

  18. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment

  19. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment.

  20. Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York

    Energy Technology Data Exchange (ETDEWEB)

    1990-06-01

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs.

  1. Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York

    International Nuclear Information System (INIS)

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs

  2. Planning annualised hours with a finite set of weekly working hours and cross-trained workers.

    OpenAIRE

    Corominas Subias, Albert; Lusa García, Amaia; Pastor Moreno, Rafael

    2007-01-01

    Annualising working hours (i.e., the possibility of irregularly distributing the total number of working hours over a year) permits companies to adapt capacity to fluctuations in demand, thus reducing overtime, temporary workers and inventory costs. Since annual hours can lead to a worsening of the staff’s working conditions, many laws and collective bargaining agreements contain constraints that affect the distribution of working time. This paper proposes a MILP model to solve an annualised ...

  3. Planning annualised hours with a finite set of weekly working hours and joint holidays

    OpenAIRE

    Corominas Subias, Albert; Lusa García, Amaia; Pastor Moreno, Rafael

    2004-01-01

    Annualising working hours (i.e., the possibility of irregularly distributing a total number of working hours over a year) permits companies to adapt capacity to fluctuations in demand, thus reducing overtime, temporary workers and inventory costs. Since annual hours can lead to a worsening of the staff’s working conditions, many laws and collective bargaining agreements contain constraints that affect the distribution of working time. This paper proposes a MILP model to solve an annualised wo...

  4. Analytical Chemistry Laboratory Quality Assurance Project Plan for the Transuranic Waste Characterization Program

    Energy Technology Data Exchange (ETDEWEB)

    Sailer, S.J.

    1996-08-01

    This Quality Assurance Project Plan (QAPJP) specifies the quality of data necessary and the characterization techniques employed at the Idaho National Engineering Laboratory (INEL) to meet the objectives of the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Transuranic Waste Characterization Quality Assurance Program Plan (QAPP) requirements. This QAPJP is written to conform with the requirements and guidelines specified in the QAPP and the associated documents referenced in the QAPP. This QAPJP is one of a set of five interrelated QAPjPs that describe the INEL Transuranic Waste Characterization Program (TWCP). Each of the five facilities participating in the TWCP has a QAPJP that describes the activities applicable to that particular facility. This QAPJP describes the roles and responsibilities of the Idaho Chemical Processing Plant (ICPP) Analytical Chemistry Laboratory (ACL) in the TWCP. Data quality objectives and quality assurance objectives are explained. Sample analysis procedures and associated quality assurance measures are also addressed; these include: sample chain of custody; data validation; usability and reporting; documentation and records; audits and 0385 assessments; laboratory QC samples; and instrument testing, inspection, maintenance and calibration. Finally, administrative quality control measures, such as document control, control of nonconformances, variances and QA status reporting are described.

  5. Development of Methods of Evaluating Abilities to Make Plans in New Group Work

    Science.gov (United States)

    Kiriyama, Satoshi

    The ability to evaluate something vague which is, for example, originality can be regarded as one of important elements which constitute the ability to make plans. The author has made use of cooperative activities in which every member undertakes each stage of a plan-do-check-cycle in order to develop training methods and evaluating methods of evaluating ability. The members of a CHECK team evaluated activities of a PLAN team and a DO team. The author tried to grasp the abilities of the members of a CHECK team by analyzing results of the evaluation. In addition, the author have made some teachers evaluate a sample in order to study the accuracy of criteria and extracted some challenges.

  6. Planning and implementation of a "Work and study in French" event in the French Institute

    OpenAIRE

    Tallus, Mirka

    2015-01-01

    This thesis was commissioned by the French Institute in order to create a link between it and Haaga-Helia students. The main focus of this thesis involved the planning process of creating an event. The primary objective was to plan and implement an event for the French Institute. A limitation to this study was that a budget was not determined. Marketing was implemented via the Institute’s partners, social media and complimentary tools provided by Haaga-Helia. This study is a project-based...

  7. Quality Assurance Program Plan for the Waste Isolation Pilot Plant Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    This Quality Assurance Program Plan (QAPP) identifies the quality of data necessary to meet the specific objectives associated with the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Experimental-Waste Characterization Program (the Program). DOE plans to conduct experiments in the WIPP during a Test Phase of approximately 5 years. These experiments will be conducted to reduce the uncertainties associated with the prediction of several processes (e.g., gas generation) that may influence repository performance. The results of the experiments will be used to assess the ability of the WIPP to meet regulatory requirements for the long-term protection of human health and the environment from the disposal of TRU wastes. 37 refs., 25 figs., 18 tabs

  8. Walking the Torque: Proposed Work Plan for Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Electric motor-driven system is the largest single energy end use accounting for more than 40% of global electricity consumption. This paper sets out an ambitious but achievable target with the global work plan to improve the energy efficiency of electric motor-driven system by 10% to 15% based on the finding of working paper ''Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems (Waide et al., 2011)''. If governments commit to the proposed work plan immediately and maintain resourcing levels, this could be achieved by 2030 and it would be equivalent to reducing total global electricity use by around 5%. The proposed work plan of this paper is to align regulatory settings within a globally applicable scheme. The IEA believes this target can only be achieved through global co-operation leading to aligned national policy settings that countries can unlock the economies of scale that will result from using more energy efficient EMDS.

  9. Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    International Nuclear Information System (INIS)

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone No.3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  10. Integrated Program of Experimental Diagnostics at the NNSS. An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-09-01

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  11. Solid waste programs Fiscal Year 1995 multi-year program plan/fiscal year work plan WBS 1.2.1

    International Nuclear Information System (INIS)

    The Hanford Mission Plan, Volume 1, Site Guidance identifies the need for the Solid Waste Program to treat, store, and dispose of a wide variety of solid material types consisting of multiple radioactive and hazardous waste classes. This includes future Hanford Site activities which will generate new wastes that must be handled as cleanup activities are completed. Solid wastes are typically categorized as transuranic waste, low level waste, low level mixed waste, and hazardous waste. To meet this need the Solid Waste Program has defined its mission as the following - receive, store, treat, decontaminate, and dispose of solid radioactive and nonradioactive dangerous wastes in a safe, cost effective and environmentally compliant manner. This workbook contains the program overview, program baselines and fiscal year work plan for the Solid Waste Program

  12. An experimental test plan for the characterization of molten salt thermochemical properties in heat transport systems

    Energy Technology Data Exchange (ETDEWEB)

    Pattrick Calderoni

    2010-09-01

    Molten salts are considered within the Very High Temperature Reactor program as heat transfer media because of their intrinsically favorable thermo-physical properties at temperatures starting from 300 C and extending up to 1200 C. In this context two main applications of molten salt are considered, both involving fluoride-based materials: as primary coolants for a heterogeneous fuel reactor core and as secondary heat transport medium to a helium power cycle for electricity generation or other processing plants, such as hydrogen production. The reference design concept here considered is the Advanced High Temperature Reactor (AHTR), which is a large passively safe reactor that uses solid graphite-matrix coated-particle fuel (similar to that used in gas-cooled reactors) and a molten salt primary and secondary coolant with peak temperatures between 700 and 1000 C, depending upon the application. However, the considerations included in this report apply to any high temperature system employing fluoride salts as heat transfer fluid, including intermediate heat exchangers for gas-cooled reactor concepts and homogenous molten salt concepts, and extending also to fast reactors, accelerator-driven systems and fusion energy systems. The purpose of this report is to identify the technical issues related to the thermo-physical and thermo-chemical properties of the molten salts that would require experimental characterization in order to proceed with a credible design of heat transfer systems and their subsequent safety evaluation and licensing. In particular, the report outlines an experimental R&D test plan that would have to be incorporated as part of the design and operation of an engineering scaled facility aimed at validating molten salt heat transfer components, such as Intermediate Heat Exchangers. This report builds on a previous review of thermo-physical properties and thermo-chemical characteristics of candidate molten salt coolants that was generated as part of the

  13. IMPLICATIONS OF RESOURCE PLANNING, INNOVATION AND LEARNING FOR WORK PROCESSES AND PERFORMANCE MANAGEMENT

    OpenAIRE

    Marius-Dan Dalotă; Laura Tănăsoaica

    2010-01-01

    This paper focuses on the implementation issues associated with the innovation of enterprise resource planning (ERP) to achieve innovative large-scale change in organisations. If innovation and learning become part of a firm's leading performance indicators, this is sure to have implications for performance management (PM).

  14. Liquid effluents 1994 fiscal year work plan: WBS 1.2.2.1

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, F.L. Jr.

    1993-08-01

    The program mission is to manage current and future liquid effluent streams in a safe, responsible, cost effective and legally compliant manner. This is achieved through planning and integration, public and stakeholder interaction, definition of requirements for generators and provision of timely treatment, storage, disposal capability, and waste minimization of waste streams where applicable.

  15. 76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2011-06-17

    ... developing Alaska's communities. Particular focus will be given to the collaborative efforts of the... unique collaborative effort. No funding is dedicated to this activity. Energy Program The Energy Program... Program has been methodically investing in the planning, design and construction of primary care...

  16. Promoting and Expanding Apprenticeship: A Strategic Plan for Preparing America's Work Force of Tomorrow (Phase I).

    Science.gov (United States)

    Employment and Training Administration (DOL), Washington, DC. Office of Work-Based Learning.

    A strategic plan to strengthen and expand the nation's existing apprenticeship system contains three components: apprenticeship promotion and marketing, national registration and tracking system, and quality. Efforts to promote apprenticeship must involve a two-pronged strategy that seeks both to develop new programs and expose potential program…

  17. Developing strategic marketing plans that really work a toolkit for public libraries

    CERN Document Server

    Kendrick, Terry

    2006-01-01

    Many government and other reports stress the need to get public libraries back into the lives of potential users, and this requires significant marketing effort on the part of the libraries. This book de-mystifies the marketing planning process and sets it in the context of modern public library services.

  18. Site characterization plan overview: reference repository location, Hanford Site, Washington: Consultation draft: Nuclear Waste Policy Act (Section 113)

    International Nuclear Information System (INIS)

    As part of the process for siting the nation's first geologic repository for radioactive waste, the Department of Energy (DOE) is preparing a site characterization plan for the Hanford site in Benton County, Washington. As a step in the preparation of that plan, the DOE has provided, for information and review, a consultation draft of the plan to the State of Washington, the affected Indian Tribes - the Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Indian Tribe, and the Yakima Indian Nation - and the US Nuclear Regulatory Commission. The Hanford site is one of three sites that the DOE currently plans to characterize;the other sites are the Deaf Smith County site in Texas and the Yucca Mountain site in Nevada. After site characterization has been completed and its results evaluated, the DOE will identify from among the three characterized sites the site that is preferred for the repository. The overview presented here consists of brief summaries of important topics covered in the consulation draft of the site characterization plan;it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with breif descriptions of the dispoal system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Hanford site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization

  19. Plan for the Characterization of HIRF Effects on a Fault-Tolerant Computer Communication System

    Science.gov (United States)

    Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Miner, Paul S.; Koppen, Sandra V.

    2008-01-01

    This report presents the plan for the characterization of the effects of high intensity radiated fields on a prototype implementation of a fault-tolerant data communication system. Various configurations of the communication system will be tested. The prototype system is implemented using off-the-shelf devices. The system will be tested in a closed-loop configuration with extensive real-time monitoring. This test is intended to generate data suitable for the design of avionics health management systems, as well as redundancy management mechanisms and policies for robust distributed processing architectures.

  20. Work plan for the remedial investigation/feasibility study-environmental impact statement for the Maywood site, Maywood, New Jersey

    International Nuclear Information System (INIS)

    This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Maywood site located in northern New Jersey in the boroughs of Maywood and Lodi and the township of Rochelle Park. Remedial action at the Maywood site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information currently known about the Maywood site, presents a conceptual site model that identifies potential routes of human exposure to site contaminants, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. It is DOE policy to integrate the requirements of the CERCLA and NEPA processes for remedial actions at sites for which it has responsibility. This work plan also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 150 refs., 26 figs., 17 tabs

  1. Quality Assurance Program Plan for the Waste Isolation Pilot Plant Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    This Quality Assurance Program Plan (QAPP) identifies the quality of data necessary to meet the specific objectives associated with the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Experimental-Waste Characterization Program (the Program). This experimental-waste characterization program is only one part of the WIPP Test Phase, both in the short- and long-term, to quantify and evaluate the characteristics and behavior of transuranic (TRU) wastes in the repository environment. Other parts include the bin-scale and alcove tests, drum-scale tests, and laboratory experiments. In simplified terms, the purpose of the Program is to provide chemical, physical, and radiochemical data describing the characteristics of the wastes that will be emplaced in the WIPP, while the remaining WIPP Test Phase is directed at examining the behavior of these wastes in the repository environment. 50 refs., 35 figs., 33 tabs

  2. Planning of sales on the example of the companyindustry works related to the construction of buildings and civil engineering

    OpenAIRE

    Marcin, Wojnowski

    2013-01-01

    The aim of the report is the proposal next year's sales for the analyzed company. In the report, in addition to the proposal is a brief description of the company and the chosen method of sales planning with the argument of choice. Another part of the report are presented with a description of the calculations and the whole is finished with a short summary of the work.

  3. A Guided Workbook Intervention (WorkPlan) to Support Work-Related Goals Among Cancer Survivors: Protocol of a Feasibility Randomized Controlled Trial

    Science.gov (United States)

    Woods, Pernille Luxhøj; Schumacher, Lauren; Sadhra, Steven S; Sutton, Andrew J; Zarkar, Anjali; Rolf, Pauline

    2016-01-01

    Background Returning to and staying at work following illness is associated with better physical and psychological functioning. Not working has been shown to be associated with reduced self-esteem, lowered self-efficacy, and decreased belief in one's ability to return to the workplace. Although there is a growing body of research looking at what predicts return to work following cancer treatment, there are fewer studies examining interventions targeting return to work. Objective The primary objective is to assess the feasibility and acceptability of a theoretically led workbook intervention designed to support cancer patients in returning to work to inform a fully powered randomized controlled trial (RCT). Methods This is a multicenter feasibility RCT where the main analysis uses a qualitative approach. Sixty participants (aged 18-65 years) who have received a diagnosis of cancer and who intend to return to work will be randomized to either the WorkPlan intervention group or a usual care group (ratio 1:1). Participants in the intervention group will receive a guided workbook intervention (which contains activities aimed at eliciting thoughts and beliefs, identifying targets and actions, and concrete steps to achieve goals) and will receive telephone support over a 4-week period. The primary outcome measure is time taken to return to work (in days), and secondary outcome measures include mood, quality of life, illness perceptions, and job satisfaction. Data will be collected through postal questionnaires administered immediately postintervention and at 6- and 12-month follow-ups. In addition, interviews will be undertaken immediately postintervention (to explore acceptability of the intervention and materials) and at 12-month follow-up (to explore perceptions of participation in the trial and experiences of returning to work). Results Enrollment for the study will be completed in May 2016. Data analysis will commence in April 2017, and the first results are expected

  4. DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    Good, D.E.

    1997-08-19

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline.

  5. DynCorp Tricities Services, Inc. Hanford fire department FY 1998 annual work plan

    International Nuclear Information System (INIS)

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the U.S. Department of Energy operated Hanford site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. This fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This plan provides a program overview, program baselines, and schedule baseline

  6. First National Conference on the Work-Study-Play or Platoon Plan. Bulletin, 1922, No. 35

    Science.gov (United States)

    Barrows, Alice

    1922-01-01

    In February, 1922, the United States Commissioner of Education, John J. Tigert, called the First National Conference on the Work-Study-Play, or Platoon. One result of this conference was that the superintendents who attended asked the United States Bureau of Education to serve as a clearing house of information in regard to the work-study-play…

  7. The theory of planned behaviour, self-identity, and moral disengagement: what predicts sustainability at work?

    OpenAIRE

    Nigbur, D.; Coen, S.; Fernandez, A; Franz, A; Hocking, I.

    2012-01-01

    Objectives: On the occasion of the Green Impact sustainability initiative at our university, we sought to identify predictors of sustainability-related behaviours (recycling, energy saving and sustainable transport choices) among staff. Design: A quantitative on-line survey was conducted among university staff. In line with the theory of planned behaviour (TPB), we measured intentions (to recycle, to save energy, and to choose sustainable transport), attitudes, subjective norm, and percei...

  8. Detroit Works Long-Term Planning Project: Engagement Strategies for Blending Community and Technical Expertise

    OpenAIRE

    Toni L. Griffin; Dan Cramer; Megan Powers

    2014-01-01

    In January 2013, civic leaders, community stakeholders, and residents came together to release Detroit Future City: 2012 Detroit Strategic Framework Plan, a guiding blueprint for transforming Detroit from its current state of population loss and excessive vacancy into a model for the reinvention of post-industrial American cities. Three years prior, the U.S. Census had reported that the city had lost 24% of its population over the last decade and had experienced a 20% increase in vacant and a...

  9. Synthesis and trace metal characterization of potassium plutonium sulphate: working reference material for plutonium

    International Nuclear Information System (INIS)

    An attempt was made to prepare potassium plutonium sulphate, which is proposed to be the working reference material for analyzing plutonium based fuel samples and associated materials. X-ray diffraction was employed for phase characterization and the structure was found to be monoclinic in nature with a space group of P21/c. Trace metallic impurity analyses was carried out for the 26 elements e.g. Ag, Al, B, Ba, Ca, Cd, Co, Cr, Cu, Fe, Li, Mg, Mn, Mo, Na, Ni, Pb, Si, Sn, Sr, W, Zn, Dy, Eu, Sm and Gd using ICP-AES as well as D.C.Arc AES. (author)

  10. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casella, Amanda J.; Pereira, Mario M.; Steen, Franciska H.

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  11. Characterization plan for Fort St. Vrain and Peach Bottom graphite fuels

    International Nuclear Information System (INIS)

    Part of Fort St. Vrain (FSV) and most of the Peach Bottom (PB) reactor spent fuels are currently stored at INEL and may remain in storage for many years before disposal. Three disposal pathways have been proposed: intact disposal, fuels partially disassembled and the high-level waste fraction conditioned prior to disposal, and fuels completed disassembled and conditioned prior to disposal. Many options exist within each of these pathways. PNL evaluated the literature and other reference to develop a fuels characterization plan for these fuels. This plan provides guidance for the characteristics of the fuel which will be needed to pursue any of the storage or disposal pathways. It also provides a suggested fuels monitoring program for the current storage facilities. This report recommends a minimum of 7 fuel elements be characterized: PB Core 1 fuel: one Type II nonfailed element, one Type II failed element, and one Type III nonfailed element; PB Core 2 fuel: two Type II nonfailed fuel elements; and FSV fuel: at least two fuel blocks from regions of high temperature and fluence and long in-reactor performance (preferably at reactor end-of- life). Selection of PB fuel elements should focus on these between radial core position 8 and 14 and on compacts between compact numbers 10 and 20. Selection of FSV fuel elements should focus on these from Fuel Zones II and III, located in Core Layers 6, 7, and possibly 8

  12. Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

    International Nuclear Information System (INIS)

    The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) is a test program designed to yield data on measurement system capability to characterize drummed transuranic (TRU) waste generated throughout the Department of Energy (DOE) complex. The tests are conducted periodically and provide a mechanism for the independent and objective assessment of NDA system performance and capability relative to the radiological characterization objectives and criteria of the Office of Characterization and Transportation (OCT). The primary documents requiring an NDA PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC), which requires annual characterization facility participation in the PDP, and the Quality Assurance Program Document (QAPD). This NDA PDP implements the general requirements of the QAPD and applicable requirements of the WAC. Measurement facilities must demonstrate acceptable radiological characterization performance through measurement of test samples comprised of pre-specified PDP matrix drum/radioactive source configurations. Measurement facilities are required to analyze the NDA PDP drum samples using the same procedures approved and implemented for routine operational waste characterization activities. The test samples provide an independent means to assess NDA measurement system performance and compliance per criteria delineated in the NDA PDP Plan. General inter-comparison of NDA measurement system performance among DOE measurement facilities and commercial NDA services can also be evaluated using measurement results on similar NDA PDP test samples. A PDP test sample consists of a 55-gallon matrix drum containing a waste matrix type representative of a particular category of the DOE waste inventory and nuclear material standards of known radionuclide and isotopic composition typical of DOE radioactive material. The PDP sample components are made available to participating measurement facilities as designated by the

  13. Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

    Energy Technology Data Exchange (ETDEWEB)

    Carlsbad Field Office

    2005-08-03

    The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) is a test program designed to yield data on measurement system capability to characterize drummed transuranic (TRU) waste generated throughout the Department of Energy (DOE) complex. The tests are conducted periodically and provide a mechanism for the independent and objective assessment of NDA system performance and capability relative to the radiological characterization objectives and criteria of the Office of Characterization and Transportation (OCT). The primary documents requiring an NDA PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC), which requires annual characterization facility participation in the PDP, and the Quality Assurance Program Document (QAPD). This NDA PDP implements the general requirements of the QAPD and applicable requirements of the WAC. Measurement facilities must demonstrate acceptable radiological characterization performance through measurement of test samples comprised of pre-specified PDP matrix drum/radioactive source configurations. Measurement facilities are required to analyze the NDA PDP drum samples using the same procedures approved and implemented for routine operational waste characterization activities. The test samples provide an independent means to assess NDA measurement system performance and compliance per criteria delineated in the NDA PDP Plan. General inter-comparison of NDA measurement system performance among DOE measurement facilities and commercial NDA services can also be evaluated using measurement results on similar NDA PDP test samples. A PDP test sample consists of a 55-gallon matrix drum containing a waste matrix type representative of a particular category of the DOE waste inventory and nuclear material standards of known radionuclide and isotopic composition typical of DOE radioactive material. The PDP sample components are made available to participating measurement facilities as designated by the

  14. Making Investments in Dryland Development Work: Participatory Scenario Planning in the Makanya Catchment, Tanzania

    OpenAIRE

    Deborah Bossio; Peterson, Garry D.; Gordon, Line J.; Elin I. Enfors

    2008-01-01

    The agro-ecosystems of semi-arid and dry sub-humid SSA are inherently dynamic. At this point in time they are also experiencing a series of complex social–ecological changes that make their future even more uncertain. To ensure that development investments made today in the small-scale farming systems that dominate these regions make sense also in a long-term perspective they should benefit the local communities over a range of potential futures. We applied a participatory scenario plan...

  15. Work Plan for Developing Double Shell Tank (DST) Sub-System Specifications (TBR-120.015)

    International Nuclear Information System (INIS)

    The DST System stores waste from the processing of nuclear material at the Hanford Nuclear Reservation. The program to dispose of this waste has been divided into several phases with Phase 1 being the demonstration of the waste disposal technology by a private contractor. Subsystem specifications are being prepared providing requirements for the subsystem that are necessary for the continued safe storage of waste in the DST System and the removal of selected waste for processing by the privatized facility during Phase 1. This document provides the detailed plans for developing subsystem specification not developed during FY99

  16. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  17. 21st Century jobs initiative - building the foundations for a 21st Century economy. Appendix A, cluster working group initiative business plans

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The business and community leaders who participated in a four-month long series of working groups developed business plans for initiatives which would lead to further growth and competitiveness of each of the industrial clusters. This appendix contains those business plans as they stood at the end of the working group session mid-September, 1995.

  18. Huge natural gas reserves central to capacity work, construction plans in Iran

    International Nuclear Information System (INIS)

    Questions about oil production capacity in Iran tend to mask the country's huge potential as a producer of natural gas. Iran is second only to Russia in gas reserves, which National Iranian Gas Co. estimates at 20.7 trillion cu m. Among hurdles to Iran's making greater use of its rich endowment of natural gas are where and how to sell gas not used inside the country. The marketing logistics problem is common to other Middle East holders of gas reserves and a reason behind the recent proliferation of proposals for pipeline and liquefied natural gas schemes targeting Europe and India. But Iran's challenges are greater than most in the region. Political uncertainties and Islamic rules complicate long-term financing of transportation projects and raise questions about security of supply. As a result, Iran has remained mostly in the background of discussions about international trade of Middle Eastern gas. The country's huge gas reserves, strategic location, and existing transport infrastructure nevertheless give it the potential to be a major gas trader if the other issues can be resolved. The paper discusses oil capacity plans, gas development, gas injection for enhanced oil recovery, proposals for exports of gas, and gas pipeline plans

  19. Final work plan : Phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-10-12

    . This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigative activities at Savannah will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with the DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Savannah will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Savannah investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Savannah site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne will issue a Provisional Master Work Plan (PMWP; Argonne 2007) that will be submitted to the MoDNR for review and approval. The agency has already reviewed and approved (with minor changes) the present Master Work Plan (Argonne 2002) under which Argonne currently operates in Kansas. The PMWP (Argonne 2007) will provide detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by

  20. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre at sign ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4