  1. Preliminary evaluation of the seismic hazard at Cernavoda NPP site

    International Nuclear Information System (INIS)

    Mingiuc, C.; Serban, V.; Androne, M.

    2001-01-01

    The probabilistic seismic hazard analysis (PSHA) is a methodology by which one evaluates the probability of exceeding different parameters of the ground motions (the maximum ground acceleration - PGA and the ground response spectrum - SA) as effect of the seismic action, on a given site at a future time moment. Due to the large uncertainties in the geological, geophysical, seismological input data, as well as, in the models utilised, various interpretation schemes are applied in the PSHA analyses. This interpretation schemes lead to opinion discrepancies among specialists which finally lead to disagreements in estimating the values of the seismic design for a given site. In order to re-evaluate the methodology and to improve the PSHA result stability, U.S. Nuclear Regulatory Commission (NRC), U.S. Department of Energy (DOE) and Electric Power Research Institute (EPRI) sponsored a project for defining methodological guides of performing PSHA analyses. The project was implemented by a panel of 7 experts, the Senior Seismic Hazard Analysis Committee - SSHAC. This paper presents a preliminary evaluation of the seismic hazard for the Cernavoda NPP site by application of the methodology mentioned, by taking into account the possible sources which could affect the site (the Vrancea focus, Galati - Tulcea fault, Sabla - Dulovo fault and local earthquakes)

  2. Cernavoda NPP Knowledge Transfer

    International Nuclear Information System (INIS)

    Valache, C. M.

    2016-01-01

    Full text: The paper presents a description of the Knowledge Transfer (KT) process implemented at Cernavoda NPP, its designing and implementation. It is underlined that applying a KT approach should improve the value of existing processes of the organization through: • Identifying business, operational and safety risks due to knowledge gaps, • Transfer of knowledge from the ageing workforce to the peers and/or the organization, • Continually learning from successes and failures of individual or teams, • Convert tacit knowledge to explicit knowledge, • Improving operational and safety performance through creating both new knowledge and better access to existing knowledge. (author

  3. Cernavoda NPP simulator - next generation

    International Nuclear Information System (INIS)

    Tatar, F.; Ionescu, T.; Dascalu, M.

    2003-01-01

    Demand for extending the amount of training and scope for Cernavoda Unit 1 as well as the new trend in the simulator owners world, led to a change in the Romanian philosophy of simulator specification. Up to now the training was conducted on a Full Scope simulator, a 1:1 replica of Cernavoda Unit 1 reference plant. The present task is to define the simulation facilities and structure capable to meet the requirements for training, qualification and licensing of personnel for both Cernavoda Unit 1 and Unit 2. Obviously, the Cernavoda Unit 2 belongs to the same technological family but has rather different control room layout. Since this target requires a new simulator the costs would be rather high in accordance to the degree of automation of Cernavoda NPP. Therefore, depending on training requirements and financing, the Cernavoda Unit 1 simulator modernization, which also provides an alternative to full scope control room simulator, may be a viable option. Therefore the solution that with discuss for Cernavoda training extension is the migration of Cernavoda Unit 1 simulator to state-of-the-art. Consequently, the Cernavoda Unit 1 simulator modernization task will be organized as project including the following major items: 1. Rehost existing U1 simulation software from VAX 4500 to: - Best commercial multi-processor server for simulation server (HP, O/S Linux); - Best commercial single processor PC for I/O communications (HP, O/S Linux); 2. Replace DCC with enhanced emulated version: Best commercial individual PC for DCC emulation (HP, O/S Windows); Support for actual keyboards; Replacement of RAMTEK System and CONRAC Monitors with X terminals or PC's; 3. Conversion of AutoCAD-based panel graphic pages to RAVE-based; 4. Install the required software tools for developing enhanced simulation modules; 5. Replace the simulation modules with advanced modules; 6. Replace the present Windows Instructor Facilities with ISIS; 7. Development of a selection of MCR-U1 virtual

  4. Radiological impact on the surrounding area of Cernavoda NPP operation

    International Nuclear Information System (INIS)

    Busnita, M.; Penescu, M.; Neacsu, L.; Ion, M.; Moldoveanu, E.

    1996-01-01

    The objective of this paper is to present the protective measures provided to Cernavoda NPP for population and environment in case of normal operation and accidental situations. The paper describes the nuclear safety concept with the two aspects, the technical safety and the radiation protection, respectively, which represent the theoretical basis of the NPP design, construction and operation. The assessment of the potential radiological effects of Cernavoda NPP operation on the population and other environmental factors have been done by using the following input data: the natural and social characteristics of the site and the technical characteristics of the plant. The effects of Cernavoda NPP operation are also exposed in health risks which are compared with the daily risks of the population exposed of the natural phenomena or to the activities like transportation, domestics or industrial. (author). 1 tab., 6 refs

  5. Considerations related to Cernavoda NPP lifetime management

    International Nuclear Information System (INIS)

    Cojan, Mihail

    2007-01-01

    Cernavoda NPP, the first CANDU in Europe, is one of the original CANDU 6 plants and the first CANDU 6 producing over 706 MWe. While the first series of CANDU 6 plants (which entered service in the early 1980 s) have now reached the 2/3 of their 30 years design life, the Cernavoda NPP was put into service on the 2nd December 1996. After 10 years of operation the Plant Life Management (PLiM) Program for Cernavoda should be an increasingly important program to Utility ('CNE - Prod') in order to protect the investment and the continued success of plant operation. The goal of the paper is to present some considerations related to Cernavoda NPP lifetime management. The Plant Life Management Program, known as PLiM Program is concerned with the analysis of technical limits of the safe operation - from the point of view of nuclear safety - in NPP units, aiming at attaining the planned 30 years life duration and its extension to 40 or even 50 years of safe and economical operation. For the CANDU reactors the so-called PLiM and PLEX Programs are just applied. These are applied research programs that approach with priority the current practices for assessing the capability of safe operation within the limits of nuclear safety (fitness-for-service assessment). These programs also approach inspection, monitoring are prevention of degrading due to the ageing of critical systems, structures and components (CSSCs). As each nuclear plant is somewhat different in its components and systems, materials composition, procurement, construction, and operational history, directed research and development programs into materials behavior, monitoring techniques, and methods to mitigate ageing are required to support the lifetime management. Over the past 6 years, INR Pitesti (Institute for Nuclear Research - Romania) has been working on R and D Programs to support a comprehensive and integrated Cernavoda NPP Life Management Program (PLiM) that will see the Cernavoda NPP successfully and

  6. Overview of Cernavoda NPP training programme

    International Nuclear Information System (INIS)

    Valache, Cornelia

    2005-01-01

    Full text: The paper presents a general assessment of Cernavoda NPP personnel training programme, highlighting the role of training in human performance improvement. Cernavoda NPP Personnel Training and Authorization Department (PTAD) is the one responsible for the training of Unit 1 and 2 staff. PTAD is structured in such a manner as to support and respond to all Cernavoda NPP training, qualification and authorization requirements. The training of personnel is continuously adapted based on IAEA Guides and INPO/WANO recommendations, to keep with world standards, based on the internal and external reviews. At Cernavoda NPP the Training Concept and the Training Programmes are based on SAT - Systematic Approach to Training. The Training Concept is established on a set of training documents (RD's, SI's, IDP's), which address all the SAT phases: Analysis, Design, Development, Implementation and Evaluation. The Training Programmes are structured on the initial and continuing personnel training. Their content and goals respond to the training specific needs for each plant major job family. In order to successfully support NPP training programmes, CNPP training center has upgraded classrooms with new presentation facilities and there are plans to expand the space of the building, to develop additional operator and maintenance skills facilities. There are also a number of general areas for improvement of PTAD activity, such as operators and maintenance training, initial and continuing training of both Unit 1 and 2 staff. By responding in a timely and completely manner to all plant training requirements PTAD will help in rising human performance of Cernavoda NPP personnel, supporting the safe, efficient and cost effective production of power. (author)

  7. Cernavoda NPP operations training programs

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this document is to describe the philosophy, content and minimum requirements for the Cernavoda Training Programs for all Station staff and to identify the training department organization and respective responsibilities necessary to provide the required training. The hierarchical documentation and requirements related to these programs is shown in figure Rd-TR1-1

  8. Training needs analysis at Cernavoda NPP - Romania

    International Nuclear Information System (INIS)

    Georgescu, L.M.

    2002-01-01

    The paper is mainly on training needs analysis applied at Cernavoda NPP and will outline the Cernavoda (CNPP) approach in establishing what kind of training is necessary for CNPP employees, from the moment they are hired until they become qualified. The training methodology adapted at CNPP is one which adheres to the principles of the Systematic Approach to Training (SAT). SAT adoption at CNPP provides a broad integrated approach emphasizing not only technical knowledge and skills but also human factors knowledge, skills and attitudes. The analysis of SAT at CNPP consists of a 'table-top' analysis of training and qualification requirements. This paper will illustrate how a 'table-top' analysis by Subject Matter Experts is organized, carried out and recorded, and which categories of staff have begun this table-top analysis at CNPP. It will also give an example how this analysis is done: how the tasks of each job are rated, which are the used criteria, and how to proceed with the incorporation of the tasks into initial and continuing training, as appropriate. (author)

  9. Perspectives on managing nuclear safety at Cernavoda NPP past, present and future

    International Nuclear Information System (INIS)

    Serban, M.

    1997-01-01

    The presentation considers the following issues: background of Romanian nuclear programme; 1990 management issues involved in Cernavoda project, nuclear safety perspectives; Cernavoda U1 operating organization today (safety related issues); good practices at Cernavoda NPP

  10. Perspectives on managing nuclear safety at Cernavoda NPP past, present and future

    Energy Technology Data Exchange (ETDEWEB)

    Serban, M [Technical Safety Directorate, Unit 1., Cernavoda Nuclear Power Plant (Romania)

    1997-12-01

    The presentation considers the following issues: background of Romanian nuclear programme; 1990 management issues involved in Cernavoda project, nuclear safety perspectives; Cernavoda U1 operating organization today (safety related issues); good practices at Cernavoda NPP.

  11. NPP Cernavoda Unit 2 Financing Completion Works

    International Nuclear Information System (INIS)

    Chirica, T.; Stefanescu, A.; Constantin, C.; Dobrin, M.

    2002-01-01

    NPP Cernavoda Unit 2 completion is the highest priority of the Romanian power sector strategy. The nuclear energy represents, through its technological features of adopted solution (a CANDU nuclear power plant) and also through technological and economical performance indicators, the best solution to fulfill the demands concerning the sustainable development and the electricity request. The guidelines of energy strategy regarding the nuclear sector development in Romania are framing in the general policy for energy system development at least costs and they are responding to requests concerning the environment and people protection. The paper presents the financing alternatives for Unit 2 completion works taking into consideration the financing market conditions. The paper presents the impact of the financing conditions on the project efficiency, as well as the facilities offered by the Romanian Government in order to support this project. (author)

  12. Training change control process at Cernavoda NPP

    International Nuclear Information System (INIS)

    Valache, Cornelia Mariana

    2005-01-01

    The paper presents the process of 'Training Change Control' at Cernavoda NPP. This process is a systematic approach that allows determination of the most effective training and/or non-training solutions for challenges that may influence the content and conditions for a training program or course. Changes may be the result of: - response to station systems or equipment modifications; - new or revised procedures; - regulatory requirements; - external organizations requirements; - internal evaluations meaning feedback from trainees, trainers, management or post-training evaluations; - self-assessments; - station condition reports; - operating experience (OPEX); - modifications of job scope; - management input. The Training Change Control Process at Cernavoda NPP includes the following aspects. The first step is the identification of all the initiating factors for a potential training change. Then, retain only those, which could have an impact on training and classify them in two categories: as deficiencies or as enhancement suggestions. The process is different for the two categories. The deficiency category supposes the application of the Training Needs Analysis (TNA) process. This is a performance-oriented process, resulting in more competent employees, solving existing and potential performance problems. By using needs analysis to systematically determine what people or courses and programs are expected to do and gathering data to reveal what they are really doing, we can receive a clear picture of the problem and then we can establish corrective action plans to fix it. The process is supported by plant subjects matter and by training specialists. On the other hand, enhancements suggestions are assessed by designated experienced persons and then are implemented in the training process. Regarding these two types of initiating factors for the training change control process, the final result consists of a training improvement, raising the effectiveness, efficiency or

  13. ALARA and radiation protection optimization status of Cernavoda NPP

    International Nuclear Information System (INIS)

    Hau, D.I.

    2000-01-01

    ALARA in Radiation Protection is specifically applied as a tool in lowering B the risk of high exposure when performing necessary activities by reducing the doses as much and as reasonably possible. Is ALARA also a matter of IMAGE? ALARA is one of the main aspects that contributes to forming the image of a certain facility. Many experiences in the world show a decrease in the collective dose per station after proper ALARA implementation. This trend is more relevant for 'adult' nuclear sites. At Cernavoda NPP the authorization process itself included implementation of an effective ALARA program. (author)

  14. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  15. Full scope simulator commissioning and training experience at Cernavoda NPP

    International Nuclear Information System (INIS)

    Balan, M.

    2000-01-01

    The paper presents the experience gained during commissioning and the initial use of the CANDU training full-scope simulator for operation personnel at Cernavoda NPP. The full-scope simulator as an integral part of the training programs that take place in Cernavoda Nuclear Training Department (CNTD), is mainly used for the development of operational skills, knowledge and attitudes required to operate the plant in a safe and efficient manner. (author)

  16. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant, including decommissioning. (authors)

  17. Strengthening the control on radioactive sources - Cernavoda NPP operating experience

    International Nuclear Information System (INIS)

    Daian, I.; Simionov, V.

    2005-01-01

    Full text: This paper presents the national legal frame governing the radioactive source management, legislative requirements introduced during last years and current status of controlled radioactive sources program at Cernavoda NPP. Romania has only one nuclear power plant, Cernavoda NPP, equipped with five PHWR - CANDU-6 Canadian type reactors - with a 700 MW(e) gross capacity each, in different implementation stages. The legal representative of the nuclear power production sector in Romania is 'Nuclearelectrica' S.A. National Company (SNN). SNN is a governmental company controlled by the Ministry of Industry and Trade. The company has headquarters in Bucharest and three subsidiaries: - CNE-PROD Cernavoda (CNE-PROD), operating the Cernavoda NPP - Unit 1; - CNE-INVEST Cernavoda, in charge with the completion of Unit 2 and with the preservation of Units 3,4,5; - Nuclear Fuel Plant in Pitesti (FCN). Unit 1 is in commercial operation since December 2, 1996, Unit 2 is under construction (80% completed) and Units 3, 4, 5 are under preservation. The operation of Cernavoda NPP implies use of radioactive sources that may present a significant risk to health, property and the environment when control is lost. Within the last years CNCAN issued new regulations stating clear responsibilities for the different institutions involved in radioactive materials control programs. To manage radioactive sources in a safe way CNE-PROD established and revised the Controlled Radioactive Sources Program, as part of Station Radiation Protection Regulation, ensuring strict recording of the radioactive sources and their usage, ensuring physical and radiological security, protecting the personnel, members of the public and the environment from the hazards of ionizing radiation during the life cycle of the plant. (authors)

  18. Results and development prospects for the Cernavoda NPP

    International Nuclear Information System (INIS)

    Rotaru, Ioan

    2001-01-01

    The new competitive market in the power sector offers favorable conditions for continual developing of Nuclear Power in Romania. The principal arguments in this respect are: the CANDU technology is a western technology recognized world wide both for its operation reliability and its economical performances. The results obtained by Cernavoda NPP Unit 1 over a period of four years and a half commercial operation confirms the validity of the CANDU project in Romania in the new conditions of competitive market. Accomplishing the Unit 2 of Cernavoda NPP represents for the time being one of the most cost-effective investment in the Romanian power sector. Also, the participation of the local industry to the project implementation is important as it ensures the initial heavy water and nuclear fuel charging, specific materials and equipment production, design and construction works, etc. Heaving in view all these favorable arguments, the construction of Unit 2 of Cernavoda NPP represents one of the highest priorities of the State Budget of the present administration in year 2001. The Nuclear Power Project in Romania, based on CANDU technology meets national as well as EU regulations concerning nuclear power and as such its development poses no significant problems both in the context of EU extension and in the frame of the developing competitive market in the power sector. For SNN SA the main objectives in view for the next stage are: operating Cernavoda NPP Unit 1 in conditions of highest nuclear safety and economical efficiency; finalizing the Cernavoda NPP Unit 2 and creation of an organisation for operating the two units; promoting of a functional system characteristic to the competitive market economy and open to privatization; creating opportunities for exporting electrical energy. The contribution contains the following sections: 1. General overlook; 2. Performance of the power production in the year 2000; 2.1. Unit 1 of Cernavoda NPP; 2.2. Nuclear Fuel Plant

  19. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2001-01-01

    The paper reflects some key aspects related to the shift of generations during the project's development, including the present stage. Further, the place of Cernavoda NPP Unit 1 in the Romanian power sector and among other nuclear stations in the world is presented. The operational performances achieved 'in service' up to the end of 1999, with reference to the performance indicators for electrical energy production, nuclear safety, radiation protection, radioactive wastes and nuclear fuel are illustrated. For all of these items, comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. Finally, some comments about Cernavoda NPP Unit 2 project status and need to completion and commissioning it are included. (authors)

  20. Elements and strategies of Knowledge Management at Cernavoda NPP

    International Nuclear Information System (INIS)

    Valache, C.

    2010-01-01

    The paper highlights that there are Knowledge Management (KM) elements already implemented at Cernavoda NPP, ensuring the safe operation of the plant. The KM process is not formalized yet, but the following elements are part of existing KM practices for Cernavoda NPP organization: Plant policies and procedures are in place; Document control is in place using Document Management system; Configuration management is a complex and well structured process; Training and qualification is based on SAT; Learning from operating experience internal and external is a day by day practice, (procedures, PJB, PROEM, Simulator, RCA, Training, etc.); Work control system is implemented via Ventrix Work Management System; Corrective action tracking is implemented; Workforce planning and human resources management is a continuous process; Communications are implemented by the plant personnel; Company intranet and other web-based solutions (CBT) are put in place; Human performance improvement programme is on going. Also, it is reinforced the need to develop and implement a structured knowledge transfer and retention process for the Cernavoda NPP in order to preserve unique knowledge and skills that could be lost through attrition or planned staffing changes. (author)

  1. New approach of second Romanian NPP siting

    International Nuclear Information System (INIS)

    Mauna, Traian

    2010-01-01

    The NPP sitting studies in Romania began before 1975. The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units. Gained the experience from Cernavoda NPP sitting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the NPP Cernavoda project to the new parameters of close water cooling circuit and hard less and no rock foundation strata. The studies were carrying out in different stages on the inner rivers Olt, Mures, Somes in Transylvania historical region. This paper tries to reconsider shortly the old analysis according to the last IAEA Safety Standards, taking into account the new NPP generation requirement. Paper is focused on geological aspects and other local sites characteristics. (authors)

  2. Management of maintenance activities at Cernavoda NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Urjan, R.; Marinescu, S.; Corlan, L.

    2000-01-01

    After the Construction and Commissioning phases are over, the safety and economic performances of each nuclear unit are determined by the quality of its operation as well as by the combination of reliability and availability of the systems consisting the whole unit. Therefore, the value of a good maintenance program in making a safe and profitable operation is now widely recognized; all stations operating with excellent performance have well-defined policies and effectively administered programs to govern maintenance activities. The Cernavoda maintenance optimization initiative is derived from good practices suggested by such recognized bodies as the IAEA, INPO and EPRI. It should be noted that the program is evolving at this time and that this paper is an attempt to summarize the myriad of activities and plans required to finally implement the maintenance program. Although many of the elements of the program are in place, many are in various stages of completion. The main components of the program (policy's objectives, strategies used, specific subprograms, maintenance plans and their integration) are presented in brief along with the performance indicators used to assess the effectiveness of the program and maintenance activities. The new programs intended to be developed are also specified, as well as the main comments and recommendations received from IAEA experts. (author)

  3. Management of occupational exposure at Cernavoda NPP

    International Nuclear Information System (INIS)

    Chitu, C.; Popescu, I.; Simionov, V.

    2009-01-01

    Full text. Ionising radiations represent a particular risk associated with nuclear power plant operation. An effective and efficient radiation protection program must: - prevent the detriment of health due to deterministic effects; - keep all the exposures as low as reasonably achievable in order to limit the detriment of health due to stochastic effects. - provide safety and health conditions as good as other safe industries. Radiation protection of occupationally exposed workers is part of Health and Safety of Work Program. Effective dose limits, as recommended by ICRP and required by CNCAN regulations are reasonably low in order to avoid deterministic effects and to limit the probability of stochastic effects to an acceptable level. The health status of CNE Cernavoda employees is appropriately surveyed. There were not recorded cases of occupational diseases and / or other indicators of relevant biological effects in order to establish the specific response of the human body to the occupational illness risk factors. Starting since 2002 cytogenesis blood analysis for occupationally exposed individuals have been performed at the beginning of their employment and periodically for those working for more than five years in the plant. A number of up to 1900 employees have been investigated with no indication of genetic modifications. (authors)

  4. Aspects of accident management in Cernavoda NPP

    International Nuclear Information System (INIS)

    Dascalu, N.

    1999-01-01

    As a general conclusion, the accident management system as implemented at Cerna voda NPP is expected to be appropriate for handling a severe accident, should it occur, in such a way that the environmental radiological consequences would be insignificant and radiation exposure of the personnel be within recommendations. It is recognized, however, that continued development and verification of the system as well as effective personnel training programs are essential to maintain the safety level achieved. (author)

  5. Implementing the Environmental Management System ISO 14001 at the Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Jelev, Adrian

    2003-01-01

    An environmental management plan (EMP) has been developed for the Cernavoda NPP Unit 1. It contains the necessary components for identification and management of the environmental aspects of NPP. The environmental policy of the 'Nuclearelectrica' National Society and the associated EMP are the basis for the Environment Management System that will be implemented at Cernavoda NPP. The final step of this process will be the ISO 14001 certification. This paper points out to the main aspects concerning the implementation of the ISO 14001 system at Cernavoda NPP Unit 1. (author)

  6. The contract for the completion and commissioning of Cernavoda NPP - Unit

    International Nuclear Information System (INIS)

    2001-01-01

    On May 18, 2001 the commercial contract for the completion and commissioning of the Cernavoda NPP Unit 2 has been signed by Nuclearelectrica National Company (SNN SA) and its partners, AECL-Canada and ANSALDO-Italy. This contract represents a continuation of the cooperation with AECL-Canada (the owner of the licence and the designer of the nuclear part of Cernavoda NPP Unit1) and ANSALDO-Italy (the designer of the conventional part of Cernavoda NPP Unit1). The completion is scheduled to last for 54 months (4.5 years) since the date the contract takes effect and the nuclear reactor start-up (the first criticality) is scheduled for the 49 th month. The total negotiated cost for the completion was estimated to amount to 689 million dollars, against the 750 million dollars initially estimated. The works at the site will be managed by an integrated staff team of specialized personnel form AECL-Canada (111 positions), ANSALDO-Italy (72 positions) and Romania (1200 positions)

  7. Modelling the impact of Cernavoda NPP on the environment

    International Nuclear Information System (INIS)

    Constantin, A.-I.

    2001-01-01

    In connection with a stay as a visiting researcher at VTT Energy (Technical Research Center of Finland), a study was conducted related to the atmospheric dispersion and dose assessment for radioactive releases from nuclear power plants. The most important aspects of this study are described in this paper. These include: the application of the TRADOS dispersion and dose assessment model in the case of the Cernavoda NPP and the development of a special program INTEGRATION for the calculation of cloud gamma dose rate of 72 nuclides. (authors)

  8. Cernavoda NPP Unit 1 - a plant of several generations

    International Nuclear Information System (INIS)

    Rotaru, I.; Metes, M.; Anghelescu, M.S.

    2000-01-01

    Cernavoda NPP Unit 1, the first nuclear power unit in Romania, has a long and tormented history. It represents a rather unique case in Eastern Europe. The project started well before 1989 (the construction phase lasted 17 years and generations were involved in its completion), but it is effectively based on western technology (Candu). Meanwhile, the national nuclear program underwent many changes, affecting the lives and careers of Romanian nuclear professionals. Finally, on December 2 nd 1996, the unit began its c ommercial operation , being operated at its nominal power rating of 706 MW e . It now provides a reliable source of electricity for Romanian economy, supplying to the national grid about 10% of the country's average annual demand. The paper reflects some aspects related to the shift of generations during the project's development, including the present stage. The operational performances achieved 'in service' by Cernavoda NPP Unit 1 up to the end of 1999 , are also presented. Reference to the electrical energy production, performance indicators, production costs, nuclear safety, radiation protection, radioactive wastes, nuclear fuel consumption and nuclear fuel performances are included. Comparisons are performed with similar indicators reported by other worldwide nuclear power plants, in order to assess our results. (authors)

  9. Cernavoda NPP: Training for safety and reliability

    International Nuclear Information System (INIS)

    Postolache, Laura Lia

    2001-01-01

    The safe and reliable operation of NPP require successful integration of plant and system design (1), programmes and procedures (2) and qualified human resources (3). Of these three components, station personnel and management have capability to influence and improve programmes and competence of qualified personnel. Qualifying personnel includes selection, training and evaluation that meet the established performance standards. Training, therefore prepares people to achieve such competence. The critical role of operations personnel has been rightly emphasized by every country with a nuclear power programme. So far as operation team is concerned, they have to work, on the one hand with exacting safety rules and at the same time, they have to do the right thing at all times. In essence, they have to be prepared for new, emergency situations as well as for routine work. The plant operation in the Control Room is essentially a man - machine interaction and a safe and reliable operation requires them to take high quality decisions even under stressful conditions. Here lies therefore the need for high competent and licensed operations engineers who will ensure operation within the operating license of the station under the all conditions. The development of a long-term comprehensive training for Operation Staff is a requirement. The program addresses the qualification requirements of the various nuclear positions on shift, the outline content of the required training programs and the evaluation per the Systematic Approach to Training (SAT). A nuclear operator's training begins the moment he/she enters the station. It takes four to six years to develop the skills required to demonstrate that the candidate is an appropriate choice for the position. Then there's a further about two years of intense training at the Training Center on a simulator. After successful completion of the program, the candidate is authorized by the CNCAN (National Commission for Control of Nuclear

  10. The environmental constraint needs for design improvements to the Saligny I/LLW-repository near Cernavoda NPP

    International Nuclear Information System (INIS)

    Barariu, Gheorghe

    2007-01-01

    The paper presents the new perspectives on the development of the L/ILW Final Repository Project which will be built near Cernavoda NPP. The Repository is designed to satisfy the main performance objectives in accordance to IAEA recommendation. Starting in October 1996, Romania became a country with an operating nuclear power plant. Reactor 2 reached the criticality on May 6, 2007 and it will be put in commercial operation in September 2007. The Ministry of Economy and Finance has decided to proceed with the commissioning of Units 3 and 4 of Cernavoda NPP till 2014. The Strategy for radioactive waste management was elaborated by National Agency for Radioactive Waste (ANDRAD), the jurisdictional authority for definitive disposal and the coordination of nuclear spent fuel and radioactive waste management (Order 844/2004) with attributions established by Governmental Decision (GO) 31/2006. The Strategy specifies the commissioning of the Saligny L/IL Radwaste Repository near Cernavoda NPP in 2014. When designing the L/IL Radwaste Repository, the following prerequisites have been taken into account: 1) Cernavoda NPP will be equipped with 4 Candu 6 units. 2) National Legislation in radwaste management will be reviewed and/or completed to harmonize with UE standards 3) The selected site is now in process of confirmation after a comprehensive set of interdisciplinary investigations. (author)

  11. Operator refresher training and requalification at Cernavoda NPP

    International Nuclear Information System (INIS)

    Timoftei, D.

    2002-01-01

    The paper presents the Operator's training program for refresher and requalification purposes, which were developed using the CANDU training full-scope simulator at Cernavoda NPP. First the purpose of both programs is described, and then more details on how these programs are delivered are given. The Refresher Training Program, part of the Operator Continuing Training Program, and the Requalification Training Program are periodically training given to the previously authorised operating personnel. The training and the evaluation are conducted both on an individual and on the team basis. Both programs are tailored according with Systematic Approach to Training concept. In addition to that the importance of the training on simulator arises from the fact that the training is mostly related to plant transients/accidents that in real life may never happens, but the operators should be always prepared for the worst. Continuing Training Program (CTP) applies to the authorized positions of Shift Supervisor (SS) and Control Room Operator (CRO) at CNE-PROD Cernavoda. Also, the program is establishing the criteria and the process, which will allow the authorised SS and CRO to maintain their authorised status. (author)

  12. Diagnosis methods based on noise analysis at Cernavoda NPP, Romania

    International Nuclear Information System (INIS)

    Banica, Constantin; Dobrea, Dumitru

    1999-01-01

    This paper describes a recent noise analysis of the neutronic signals provided by in-core flux detectors (ICFD) and ion chambers (IC). This analysis is part of on-going program developed for Unit 1 of the Cernavoda NPP, Romania, with the following main objectives: - prediction of detector failures based on pattern recognition; - determination of fast excursions from steady states; - detection of abnormal mechanical vibrations in the reactor core. The introduction presents briefly the reactor, the location of ICFD's and IC's. The second section presents the data acquisition systems and their capabilities. The paper continues with a brief presentation of the numerical methods used for analysis (section 3). The most significant results can be found in section 4, while section 5 concludes about useful information that can be obtained from the neutronic signals at high power steady-state operation. (authors)

  13. Risk management solutions for Cernavoda Unit #2 NPP completion

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.

    2002-01-01

    The greatest risk facing today's electric utilities is change. Utility risk managers are being challenged to address the changes of deregulation, new technologies and changing work force. The utilities must be more aware of where all its costs are located to face with the challenge of competition, forcing them to respond with lower prices and innovative services. For completion of large projects, like Cernavoda NPP, Unit 2, the utilities are facing also with certain specific risks: politic, economic, social. The natural perils or machinery breakdown are common risks for operation as well as for construction-commissioning projects. Beyond the explicit challenges associated with the completion of a nuclear power plant in a transition economy environment, the utilities are facing with new risk factors such as professional liability, political risk, product warranty and liability, international exposure, etc. Changes in other governmental policies are also affecting large projects, mentioning healthcare, workplace safety, workers' compensation, environmental clean up, etc.(author)

  14. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  15. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  16. Characterization of the solid radioactive waste from Cernavoda NPP

    International Nuclear Information System (INIS)

    Iordache, M.; Lautaru, V.; Bujoreanu, D.

    2005-01-01

    During the operation of a nuclear plant significant quantities of radioactive waste result that have a very large diversity. At Cernavoda NPP large amounts of wastes are either non-radioactive wastes or radioactive wastes, each of these being managed completely different from each other. For a CANDU type reactor, the occurrence of radioactive wastes is due to contamination with the following types of radioactive substances: - fission products resulting from nuclear fuel burning; - activated products from materials composing the technological systems; - activated products in process fluids. Radioactive wastes can be in solid, liquid or gas form. At Cernavoda NPP the solid wastes represent about 70% of the waste volume which is produced during plant operation and as a consequence of maintenance and decontamination operations. The most important types of solid wastes that are obtained and then handled, processed (if necessary) and temporarily stored are: solid low-level radioactive wastes (classified as compactible and non-compactible), solid medium radioactive wastes, spent resins, used filters and filter cartridges. The liquid radioactive waste class includes organic liquids (used oil, scintillator liquids and used solvents) and aqueous wastes resulting from process system operating, from decontamination and maintenance operations. Radioactive gas wastes occur subsequently to the fission process inside the fuel elements as well as due to the neutron activation of process fluids in the reactor systems. As result of plant operation, iodine, noble gases, tritium and radioactive particles occur and are passed toward the ventilation stack in a controlled manner so that environmental release of radioactive materials with concentrations exceeding the maximum permissible level could not occur. (authors)

  17. Characterization of the solid radioactive waste From Cernavoda NPP

    International Nuclear Information System (INIS)

    Iordache, M.; Laotaru, V.

    2005-01-01

    Full text: During the operation of a nuclear plant significant quantities of radioactive waste result that have a very large diversity. At Cernavoda NPP large amounts of wastes are either non-radioactive wastes or radioactive wastes, each of these being managed completely different from which other. For a CANDU type reactor, the appearance of radioactive wastes is due to contamination with the following types of radioactive substances: - fission products resulting from nuclear fuel burning; - activated products from materials composing the technological systems; - activated products in process fluids. Radioactive wastes can be in solid, liquid or gas form. At Cernavoda NPP the solid wastes represent about 70% of the waste volume which is produced during plant operation and as a consequence of maintenance and decontamination operations. The most important types of solid wastes that are obtained and then handled, processed (if necessary) and temporarily stored are: solid low-level radioactive wastes (classified as compactible and non-compactible), solid medium radioactive wastes, spent resins, used filters and filter cartridges. The liquid radioactive waste class includes organic liquids (used oil, scintillator liquids and used solvents) and aqueous wastes resulting from process system operating, from decontamination and maintenance operations. Radioactive gas wastes occur subsequently to the fission process inside the fuel elements as well as due to the neutron activation of process fluids in the reactor systems. As result of plant operation, iodine, noble gases, tritium and radioactive particles occur and are passed toward the ventilation stack in a controlled manner so that environmental release of radioactive materials with concentrations exceeding the maximum permissible level could not occur. (authors)

  18. Determination of the NPP Cernavoda reactor building seismic response

    International Nuclear Information System (INIS)

    Krutzik, N.J.; Rotaru, I.; Bobei, M.; Mingiuc, C.; Serban, V.

    1997-01-01

    Seismic input for systems and equipment installed in buildings depends on: - the seismic movement in free field on site; - the building movement in the soil; - the building deflection. The percentage of the 3 movements for the system and equipment input, depends on the position of the systems and equipment inside the building as well on the type of the foundation soil. The type of the foundation soil is important because if it is stiff it transfers a lot of energy to the building, energy which amplify the movement of the building on the top. If the foundation soil is soft, it accommodates the overall movement of the building in the soil, amplifying the movement to lower levels and the building response is attenuated if a resonance phenomenon between the whole building movement and the seismic excitation does not exist. This input is given with the design floor response spectra (FRS), in the logarithmic scale and seismic anchor movement (SAM). The design floor response spectra for NPP Cernavoda U1 Nuclear Building were determined in several stages starting with simple models (STICK type) without twisting movement and ending with detailed 3-dimensional models. From the point of view of dynamic behavior, the Reactor Building can be considered to be made up of 4 sub-structures: the containment building, internal structures containing separate elements such as the reactor vault, the fuel transfer structure and itself. Each sub-structure has its own movement (some of the structures present also some local effects) which combines with the overall movement of the building in the soil and the seismic excitation produce the total movement so that the response spectrum for each point of the sub-structure is specific. One should note that for structures which also show the twisting effect, the selection of the points on the floor, for the determination on the response spectra, is an engineering decision so that the response should be relevant for the equipment installed on the

  19. Status of the spent fuel dry storage programme for Cernavoda NPP

    International Nuclear Information System (INIS)

    Radu, M.

    1999-01-01

    The Cernavoda NPP Unit 1 (600 MWe Standard type) is in operation since December 1996. Within the framework of the R and D Radioactive Waste and Spent Fuel Management Programme, investigations, studies and research are carried out on site identification and conceptual designs for both a Spent Fuel Interim Storage Facility and a Spent Fuel Disposal Facility. The status of the work performed in the framework of this programme as well as the situation of the spent fuel resulting from the Research Institutes will be presented in the paper. (author)

  20. Cernavoda NPP impact study on terrestrial and aquatic biota. Preliminary results

    International Nuclear Information System (INIS)

    Bobric, Elena; Bucur, Cristina; Popescu, Ion; Simionov, Vasile; Titescu, Gheorghe; Varlam, Carmen

    2010-01-01

    Recently, the awareness of the vulnerability of the environment has increased and the need to protect it against industrial pollutants has been recognized. The concept of sustainable development, requires new and developing international policies for environmental protection. See 'Protection of the environment from the effects of ionizing radiation' IAEA-TECDOC-1091, International Atomic Energy Agency, Vienna. As it is recommended in 'Cernavoda Unit No. 2 NPP Environmental Impact Assessment CES-03702-IAD-006', it is Cernavoda NPP responsibility to conduct an Ecological Risk Assessment study, mainly to assess the impact of nuclear power plant operation on terrestrial and aquatic biota. Long records from normal operation of Cernavoda Unit 1, wind pattern, meteorological conditions, and source terms data were used to evaluate areas of interest for environmental impact, conducting to a circle of 20 km radius around mentioned nuclear objective. The screening campaign established tritium level (because Cernavoda NPP is a CANDU type reactor, and tritium is the most important radioisotope evacuated in the environment) in air, water, soil and vegetation, focusing the interest area on particular ecosystem. Using these primary data it was evaluated which are the monitored ecological receptors and which are the measurement endpoints.This paper presents the Ecological Risk Assessment at Cernavoda NPP technical requirements, and the preliminary results of evaluating criteria for representative ecosystem components at Cernavoda NPP. (authors)

  1. Cernavoda NPP environmental management system - tool for managing the impact on the environment

    International Nuclear Information System (INIS)

    Gabriel, B.; Adrian, J.

    2009-01-01

    Nuclearelectrica SA (SNN SA) is a state owned company which produces nuclear-generated electricity, heat and CANDU 6 type nuclear fuel. The company has also an active participation in the power development program in Romania. The Cernavovoda NPP, one of the SNN branches is situated at 180 km east of Bucharest, in Constanta County at about 2 km SE from Cernavoda town is a CANDU 6 type. Cernavoda Nuclear Power Plant (NPP) is dedicated to generate electrical and thermal power, safely and efficiently for at least 30 years. Having an annual gross output of 5.2 - 5.4 MWh, the Cernavoda Unit 1 NPP provides 10% of the Romanian electric power production. Starting January 01 2007, the Cernavoda Unit 1 NPP supplied into the grid 5518346 MWh electric power and during 1997 - 2007 the Cernavoda Unit 1 NPP supplied into the grid 55769213 MWh electric powers. Over the same period Unit 1 also provided the partial district heating of the town of the Cernavoda supplying about 601517.9 Gcal. Romania second CANDU nuclear power plant, Cernavoda Unit 2, was officially placed in service on Friday, October 5, 2007 together with Unit 1, the CNE-Cernavoda Station is the largest power producer in the country. It now accounts for about 18 per cent of Romania energy supply and significantly reduces its dependency on expensive energy resources from outside of Europe. It provides a structured approach to planning and implementing environmental protection measures. It also establishes a framework for tracking, evaluating and communicating environmental performance. SNN SA mission is to operate the Cernavoda NPP - in a competitive, safe and environmental friendly manner so that the production is optimized and the economic life time of the plant is as long as possible. One major accomplishment is the achievement of ISO 14001 certification for our Environmental Management System (EMS) at Cernavoda NPP. The aim of this paper is to present the EMS implemented and to emphasize the outcomes of the

  2. Specific aspects for Cernavoda - Unit 1 NPP life assurance

    International Nuclear Information System (INIS)

    Rucareanu, R.

    2002-01-01

    Full text: The main scope of a Plant Life Management Program is to operate the NPP in a safe manner and at a competitive cost during the reactor life. To achieve this goal, it is important to continuously evaluate the degradation of the main structures and components of the NPP. Background -Cernavoda NPP design life is 30 years. Compared with this target, the operation history is not long (Unit 1 is in commercial operation since 1997). It is still important to begin a plant life management program early to identify the critical components and structures, to establish the data needed for their monitoring and to find methods to mitigate their degradation. A specific aspect for Cernavoda NPP - Unit 1 is the long delay between the fabrication of the main components and the start-up. Most components were procured 10-15 years before start-up. First criticality was achieved in 1996, but the containment perimeter wall sliding was complete in 1983, the Calandria vessel was installed in 1985, the Steam Generators were in position in 1987, the fuel channels were installed in 1989. In evaluating the history of these components, the preservation period must be observed. For Unit 2, which will be in service around 2005, the delay will be longer. For this reason, CNCAN (the Romanian Regulatory Authority) imposed, as a condition to resume the work, to evaluate the ageing of the existing components and structures in order to establish their acceptability for use in the plant. The results of this evaluation can be used as references for subsequent evaluations. Plant Life Assurance Programme - The first step of a PLIM programme is to identify the components and structures that are important for the plant life management. Critical components and structures selection is done using the following criteria: safety criteria - components and structures whose failure can cause a release of radioactivity or which have to mitigate the release of radioactivity in case of a failure of other

  3. Conditioning the radioactive oils released from the Cernavoda NPP operation

    International Nuclear Information System (INIS)

    Popescu, I.; Deneanu, N.; Dulama, M.; Baboiescu, E.

    2001-01-01

    The radioactive oils released during the Cernavoda NPP operation are lubricating oils used in the primary circuit pumps, hydraulic oils used in the reactor charging machine, as well as, waste turbine oils. The primary cooling circuit is the main way of contamination. This waste contain variable amounts of tritium of activities up to 10 8 Bq/l and relatively small amounts of β/γ emitting radionuclides. The radioactive oils resulting of the heat transport system may contain as much as 1.8 TBq/l of tritium. At INR Pitesti, Department of Radioactive Waste Processing, studies were done concerning the radioactive oils conditioning in concrete. It was found that the minimal compression level required for disposal, of 50 MPa, was exceeded. As consequence, the conditioned waste fulfils the conditions of acceptance provided by the Radioactive Waste National Repository at Baita-Bihor. The main stages of the process are: - dosing the radioactive oil, water and NOFOX9 and NOFOX4 emulsion additives for the 220 l or 80 l barrel; - mixing these ingredients up to reaching the emulsion state; - dosing the cement and lime; - adding the enhancing silicate and shaking the mixture to get a homogeneous matrix; - closing the barrel; - conditioning the 80 l barrel within the 220 l container. The production capacity is of 5 to 8 barrels/shift

  4. Configuration management and change control at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Gheorghiu, Virgil

    1998-01-01

    Effective configuration management requires that: 1. the design basis of station structures, systems, equipment and components be maintained at all times; 2. only accurate and approved technical, operational and maintenance information is available for performance of station activities; 3. correct operating manuals, flowsheets, operating sequences, operating task and training manuals are prepared and maintained currently. Design Engineering at Cernavoda NPP is primarily the responsibility of the Engineering Services Department supported if necessary by the Technical Unit. The key elements needed to achieve excellence in design engineering support for station operation, including design process and implementation of modification are investigated by answering the questions: 1. What is the station expectation for design change control?; 2. How is this provided?. Concerning design, the following aspects are stressed: Detailed Design Development; Design Verification; Design Change Implementation. The present design process is auditable and well documented. It consists of detailed design development, and design output documents such as applicable drawings, procurement specifications, installation and test requirement and the results of design and safety reviews. The design change implementation does not proceed until an Inspection Test Plan has been developed and approved as required. (author)

  5. Estimation of radionuclide releases in atmosphere from Cernavoda NPP based on continuous gaseous effluent monitoring

    International Nuclear Information System (INIS)

    Bobric, E.; Murgoci, S.; Popescu, I.; Ibadula, R.

    2001-01-01

    Monitoring of gaseous effluents from Cernavoda NPP is performed to assess the environmental impact of the plant operation. The results of the monitoring program are used to evaluate the population doses in order to ensure that the emissions of radionuclides in air are below regulatory limits and radiation doses are maintained ALARA. It complements, but is independent from the Operational Environmental Monitoring Program for Cernavoda NPP. Gaseous effluent monitors provide continuous indication of the radioactivity content in atmospheric emissions. Except for noble gases, these monitors also collect samples for later detailed analysis in the station Health Physics Laboratory. This paper presents the main equipment and the results of the gaseous effluents monitoring program in order to assess the impact of Cernavoda NPP operation and to predict the future releases as function of radionuclides concentrations in CANDU systems, based on the identified trends.(author)

  6. Experimental determinations of the turbine condenser operation at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Romascu, Gabriel; Dragusin, Dumitru; Rogociu, Ioan; Macodean, Luminita; Marciulescu, George

    1999-01-01

    The condenser system represents one of the most important BOP (balance of plant) systems of the CANDU 700 MW Unit at Cernavoda NPP. The paper presents theoretical calculation elements, mathematical model for simulation of condenser operation and the results obtained by model implementation as compared to operation data. The model could be adapted to other turbine and operation regime types. (authors)

  7. Cernavoda NPP Unit 2 and Romanian nuclear industry

    International Nuclear Information System (INIS)

    Mocanu Horia

    2001-01-01

    On 18 May 2001, in the presence of Mr. Adrian Nastase, the Prime-Minister of Romania, the presidents of AECL, ANSALDO and Director General of SN Nuclearelectrica, the commercial and management contract for completing the Cernavoda NPP Unit 2 was signed. This document stipulates the goal and the partners' commitments, leadership organization, the SN Nuclearelectrica's control of the Budget, costs for the technical assistance (around 180 specialists from abroad), as well as the costs of equipment supplied from Canada and Italy. Services and equipment supplied by Canada and Italy amounts up to around USD 300 millions. Efforts are currently undertaken to obtain a loan of USD 300 millions from EURATOM, beginning from 2003. An auction process, implying around 10 companies, is underway and by the completion of the process, in February 2002, the practical delivery of equipment will start. The so-far invested capital amounts around USD 650 millions while the capital funds remaining to be invested amounts up to about USD 689 millions. From the latter figure, around USD 100 millions represent the costs for heavy water and the initial nuclear fuel charging. The personnel dynamics is presented as well as problems relating with recruitment and salary policy. Romanian nuclear industry is engaged for supply of a series of important components. General Turbo SA, supplied already components of some tens USD millions for the turbogenerator complex. PETROTUB company from Roman, Romania supplied already one thousand tones of non-nuclear carbon steel tubing valued at about USD 300 millions. ARIO, Bistrita, Romania, has signed contracts valued at about USD 400,000 for non-nuclear reinforcing materials. Other companies like AVERSA SA and Ventilatorul SA supplied reliable equipment for Unit 1 and will continue to do the same for Unit 2. Contracts of over one million USD are carried on with VULCAN for carbon steel fittings and with TITAN Nuclear Equipment for components of the fueling

  8. Cernavoda NPP Unit 2: 'A year of progress'

    International Nuclear Information System (INIS)

    Cullen, Ronald G.

    2004-01-01

    The year 2004 is now coming to an end and has proven to be 'A Year of Progress' at the Cernavoda 2 nuclear project. Staffing levels have reached their peak in all departments with the exception of Commissioning. The Management Team (MT) now has more than 1600 staff employed. There are 18 contractors working on the site, 3 Romanian Engineering organizations working out of Bucharest and countless manufacturers supplying materials for 2500 Romanian domestic orders, 440 Romanian International orders, 400 Canadian orders and 212 Italian orders. To date the project has met all milestones, most notably in 2004 was the First Energization of the Station Service Transformer in October, marking the start of the commissioning program. The Primary Heat Transport piping was completed ahead of schedule, and installation of the Stand-by Diesel Generators were effected. The D 2 O up-grader building was erected, the Main Moderator pumps, piping and heat exchangers were installed, and the Main Control Room was completed with the majority of the panels installed including the Digital Control Computers. By the end of the year 12 of the more than 290 systems will have been transferred from Construction to Commissioning and the overall project will be approximately 78% complete. A significant event for the year was the approval of the EURATOM loan, which provides financial stability for the remainder of the project. The request for the first draw against this loan has been made and disbursement is expected early in the New Year. There were problems that had to be overcome during the year. Securing qualified construction contractor's staff and qualified vendors has proven to be a major challenge. The introduction of electronic management tools in the Management organization has required significant training and inputting of a backlog of data. Refurbishment of existing equipment on all safety systems and materials has placed an added demand on resources and delays in having material

  9. Annx IV. Delayed nuclear power plant project management experience Cernavoda 2 NPP, Romania

    International Nuclear Information System (INIS)

    2008-01-01

    greater contingency due to the uncertainty of the legacy equipment inventory, the possible effect of code changes during the legacy period, and the possibility of schedule extensions. One of the critical success factors for the construction restart of Cernavoda NPP Unit 2 was the condition and assessment of existing material and equipment stored in the warehouses or installed in the field. A preservation program was implemented separately for site-installed materials and managed through the construction division. Subsequently, a refurbishment program was also implemented on identified equipment, which including checking and testing of equipment and changing materials defined as obsolete or undesirable for further use in operation of equipment. For the most part, the extent of testing of equipment is the same as for a new build project. However, some major components require additional testing which should be performed early enough in the program to take corrective action if required. A good example of this is the Main Output Transformers T01, and T02, which were manufactured 20 years ago by Electroputere in Romania. These transformers have been preserved on site and recently refurbished. The Cernavoda 2 Project provided many opportunities to better define the correct approach to a successful completion of a delayed project. Most significant is the need to have a full assessment and definition of the remaining scope of work before the beginning of the Completion Contract. In conclusion, MT Project Management team adapted their work processes and procedures to suit the specificity and challenges of the Cernavoda 2 project. Interfaces with internal groups and external organizations were optimized through efficient communication processes. This allowed timely identification of issues through to the Engineering, Procurement, Construction, Planning, and Commissioning organizations. It was clearly demonstrated that teamwork, creativity and dedication to quality and productivity

  10. The influence of increased temperature of waters from Cernavoda NPP on underground water sources

    International Nuclear Information System (INIS)

    Isbasoiu, Eugen Constantin; Marinov, Anca Mariana; Moraru, Carina Nicoleta; Rizescu, Gheorghe

    1997-01-01

    The operation of Cernavoda NPP implies the change of thermal regime of waters in the Danube-Black Sea channel zone. The Danube water is used to cool the NPP systems before being delivered into channel and used in irrigations. The temperature increase of water in Cernavoda NPP installations is between 7 and 12 deg. C. The negative effects of this warming are: 1. limitation of water use for irrigations; 2. occurrence and persistence of fog in channel area; 3. thermal pollution of underground waters and limitation of underground potable water supply. The paper presents a general approach of thermal pollution problems of an aquifer and a mathematical model of forecasting the underground water temperature variation in Danube-Black Sea channel area. (authors)

  11. Radioactive waste management at Cernavoda NPP after 5 years of experience

    International Nuclear Information System (INIS)

    Raducea, D.

    2002-01-01

    Many human activities generate waste but people are worried about those produced in nuclear power plants. Their concern is an unjustified fear toward the hazard from radioactive wastes because any country, which produces electrical power in this way, pays a lot of attention of all relevant parties involved in radioactive waste management. The same policy is applied for Cernavoda NPP. Our concept establishes the general approach required for the collection, handling, conditioning and storage of radioactive waste from Cernavoda NPP Unit 1 and will be ready for expansion when other units are brought into service. Among others, a major objective is to reduce the radioactive waste production and volume. In this regard we are trying to improve as much as possible our procedures and radioactive wastes management. Further, it will be presented the radioactive waste management, including the improvements in our program and the future plans.(author)

  12. Cernavoda NPP risk - Based test and maintenance planning - Methodology development

    International Nuclear Information System (INIS)

    Georgescu, G.; Popa, P.; Petrescu, A.; Naum, M.; Gutu, M.

    1997-01-01

    The Cernavoda Power Plant starts the commercial operation in November 1996. During operation of the nuclear power plant, several mandatory tests and maintenance are performed on stand-by safety system components to ensure their availability in case of accident. The basic purpose of such activities is the early detection of any failure and degradation, and timely correction of deteriorations. Because of the large number of such activities, emphasis on plant safety and allocation of resources becomes difficult. The probabilistic model and methodology can be effectively used to obtain the risk significance of these activities so that the resources are directed to the most important areas. The proposed Research Contract activity is strongly connected with other safety related areas under development. Since, the Cernavoda Probabilistic Safety Evaluation Level 1 PSA Study (CPSE) was performed and now the study is revised taking into account the as-built information, it is recommended to implement into the model the necessary modeling features to support further PSA application, especially related to Test and Maintenance optimization. Methods need to be developed in order to apply the PSA model including risk information together with other needed information for Test and Maintenance optimization. Also, in parallel with the CPSE study updating, the software interface for the PSA model is under development (Risk Monitor Software class), methods and models needing to be developed for the purpose of using it for qualified monitoring of Test and Maintenance Strategy efficiency. Similar, the Data Collection System need to be appropriate for the purpose of an ongoing implementation of a risk - based Test and Maintenance Strategy. (author). 4 refs, 1 fig

  13. Cernavoda NPP: The contribution of ANSALDO ENERGIA to the development of the Nuclear Program in Romania

    International Nuclear Information System (INIS)

    Graziosi, G.; Benvenuto, F.

    2005-01-01

    Full text: The development of east European countries has been very slow during the second part of the 20th century, but, with the end of the cold war, they are recovering through a continuous improvement of their economy. The continuous improvement of the countries is usually accompanied by an increase of the energy demand and, as consequence, a rapid increase of their energy production is taking place. It is strategic that the energy production of these countries be based on earliest technologies available today, in order to avoid the worsening of the problems deriving from the energy policies adopted by the western countries: one for all the CO 2 emission in the atmosphere. Clearly to promote the use of new technologies in the growing east European countries, a tied collaboration between western and eastern European countries is essential. This is the case of Romania. The agreement reached by Romania with the Italian and Canadian industries (Ansaldo Energia and AECL) has permitted: - The construction and commissioning of Cernavoda Unit 1 NPP, realized adopting CANDU technology and in operation since 1996; - The continuous maintenance / surveillance / improvement (through a specific service agreement) that assures the safe production of the energy; - The realization of a new Nuclear Power Station: Cernavoda Unit 2, adopting the last technology available for the CANDU type. Its operation is expected to start in 2007. Furthermore, benefit/cost evaluation is under analysis in order to verify the possibility to realize Cernavoda Unit 3 NPP. (authors)

  14. Cernavoda NPP: The contribution of ANSALDO ENERGIA to the development of the Nuclear Program in Romania

    International Nuclear Information System (INIS)

    Graziosi, G.; Benvenuto, F.

    2005-01-01

    The development of east European countries has been very slow during the second part of the 20th century, but, with the end of the cold war, they are recovering through a continuous improvement of their economy. The continuous improvement of the countries is usually accompanied by an increase of the energy demand and, as consequence, a rapid increase of their energy production is taking place. It is strategic that the energy production of these countries be based on earliest technologies available today, in order to avoid the worsening of the problems deriving from the energy policies adopted by the western countries: one for all the CO 2 emission in the atmosphere. Clearly to promote the use of new technologies in the growing east European countries, a tied collaboration between western and eastern European countries is essential. This is the case of Romania. The agreement reached by Romania with the Italian and Canadian industries (ANSALDO ENERGIA and AECL) has permitted: - The construction and commissioning of Cernavoda Unit 1 NPP, realized adopting CANDU technology and in operation since 1996; - The continuous maintenance / surveillance / improvement (through a specific service agreement) that assures the safe production of the energy; - The realization of a new Nuclear Power Station: Cernavoda Unit 2, adopting the last technology available for the CANDU type. Its operation is expected to start in 2007. Furthermore, benefit/cost evaluation is under analysis in order to verify the possibility to realize Cernavoda Unit 3 NPP. (authors)

  15. Developing technologies for conditioning the liquid organic radioactive wastes from Cernavoda NPP

    International Nuclear Information System (INIS)

    Deneanu, N.; Popescu, I. V.; Teoreanu, I.

    2004-01-01

    The Institute for Nuclear Research (INR)-Pitesti has developed technologies for conditioning liquid organic radioactive wastes (oils, miscellaneous solvent and liquid scintillation cocktail) for Cernavoda NPP. This paper describes the new and viable solidification technology to convert liquid organic radioactive wastes into a stable monolithic form, which minimizes the probability to release tritium in the environment during interim storage, transportation and final disposal. These are normally LLW containing only relatively small quantities of beta/gamma emitting radionuclides and variable amounts of tritium with activity below E+08Bq/l. The INR research staff in the radwaste area developed treatment/conditioning techniques and also designed and tested the containers for the final disposal, following the approach in the management of radwaste related to the nuclear fuel cycle. Thus, the INR focused this type of activity on treating and conditioning the wastes generated at Cernavoda Nuclear Power Plant consisting of lubricants from primary fuelling machines and turbine, the miscellaneous solvent from decontamination operation and the liquid scintillation cocktail used in radiochemical analysis. Laboratory studies on cementation of liquid organic radioactive wastes have been undertaken at INR Pitesti. One simple system, similar to a conventional cement solidification unit, can treat radioactive liquid wastes, which are the major components of low- and medium-level radioactive wastes generated by a Nuclear Power Plant. It was proved that the solidified waste could meet the Waste Acceptance Criteria of the disposal site, in this case Baita-Bihor National Repository, as follows: - The wastes are deposited in type A packages; - The maximum expected quantities of this waste stream that will be produced in the future are 50 drums per year. The maximum specific tritium activity per drum is 10 9 Bq/m 3 ; - Compressive strengths of the samples should be greater than 50 MPa

  16. ICEMENERG technologies of water treatment applied at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Stanca, Angela; Bolma, Aurelia; Serbanescu, Agnes; Raducanu, Alice

    2002-01-01

    The paper presents the ICEMENERG technologies for water treatment applied at Cernavoda Unit 1, the treatment of the additional water for power steam generators and the chemical treatment of cooling system water. The requirements for quality of water totally demineralized as imposed by the AECL-ANSALDO consortium are as following: electrical conductivity, < 0.2 mS/cm; total silicon, <0.02 mg/L; ionic silicon, <0.01 mg/L; sodium, < 0.05 mg/L; TOC, <0.300 mg/L. These requirements raise rather difficult problems to be solved because the raw water source in case of Cernavoda NPP is Danube River which presents a raising trend of organic and inorganic contamination. Accordingly, experiments at laboratory scale reproducing the entire technological flow were conducted. The following operations were studied: pretreatment with limewash, ferric chloride (with and without coagulation additives); demineralization with ion exchangers of Purolite and Amberlite types. The system consisted of a cationic stage, formed of an strongly acid step with countercurrent recovery and an anionic stage formed of two steps, namely, a weakly basic step and a strongly basic step with recovery inserted; finishing on mixed bed. The paper presents also the chemical treatment/conditioning of the cooling loop of turbine condenser. The Cernavoda NPP cooling system is an open system with a single flow of cooling water comprising two systems, namely, the circulation water system ensuring the steam condenser cooling and the servicing water system ensuring the cooling of heat exchangers in the recirculated water circuit (RCWS), the turbine oil coolants, the coolants of auxiliary steam as well as the emergency core cooling system. Studies were conducted to ensure the chemical conditioning of the raw water from Danube River, particularly, to destroy and remove the shells, the algae and other components. Finally, the following four steps of conditioning the water of the cooling system are summarized: 1

  17. The Romanian experience on introduction of CANDU-600 reactor at the Cernavoda NPP

    International Nuclear Information System (INIS)

    Rapeanu, S.N.; Bujor, A.; Comsa, O.

    1998-01-01

    The Cernavoda Nuclear Power Plant (NPP) Project is a key component of the Romanian nuclear development program. Selection of the CANDU design represents a major contribution to this development, due to the technological feasibility for manufacturing of parts, components and the nuclear fuel based on the uranium resources in Romania. The Romanian nuclear development program also involves a nuclear fuel manufacturing plant, a heavy water production plant and organizations specialized in research, engineering, manufacturing and completion for systems and components. The agreement on technological transfer between Canada and Romania is supporting the Romanian involvement to the achievement of the Project, with a degree of participation that is gradually increasing from the first to the last NPP Unit. (author)

  18. Modelling of preheated regenerative chain in Cernavoda NPP using MMS calculation code

    International Nuclear Information System (INIS)

    Bigu, M.; Nita, I.; Prisecaru, I.; Dupleac, D.

    2005-01-01

    Full text: In this work it was studied operation of preheated regenerative chain from NPP Cernavoda. To obtain this analysis coupled analyses of condensate system, water supply system, and drain cooler system were effected. The analysis boundaries are: Upstream: - Steam condensers - Turbine Bleed Steam Downstream: - Steam Generators. The analysis was made in two steps: 1) Getting of hydraulic characteristic of pipe network from steam condensers to steam generators at nominal regime; this step was obtained with hydraulic package called PIPENET. 2) Real thermal hydraulic analyses were done based on hydraulic characteristic of pipe network and supplementary data required for heat transfer calculation in equipment of preheated regenerative chain. Thermal analyses were done using MMS package and refered to normal operating regimes, namely, nominal operating regime required for calibration of calculating model, shutdown regime, start-up regime from zero power hot to nominal power and to abnormal operating regimes, namely, turbine trip, reactor trip and loss of two condensate pumps. The results were compared with already existing analysis and showed the largest differences at interface areas (i.e. 5%). This led us to idea of extending analysis to all secondary circuits in order to reduce the number of boundary conditions which can generate uncertainty in analysis. In this analysis we obtained an advanced model of preheated regenerative chain of secondary circuit in Cernavoda NPP which could be extended up to cover the whole secondary circuit by including the analysis of steam generators, turbine, and steam condenser. (authors)

  19. Modelling of preheated regenerative chain in Cernavoda NPP using MMS calculation code

    International Nuclear Information System (INIS)

    Bigu, M.; Nita, I.; Prisecaru, I.; Dupleac, D.

    2005-01-01

    In this work it was studied operation of preheated regenerative chain from NPP Cernavoda. To obtain this analysis coupled analyses of condensate system, water supply system, and drain cooler system were effected. The analysis boundaries are: Upstream: - Steam condensers - Turbine Bleed Steam Downstream: - Steam Generators. The analysis was made in two steps: 1) Getting of hydraulic characteristic of pipe network from steam condensers to steam generators at nominal regime; this step was obtained with hydraulic package called PIPENET. 2) Real thermal hydraulic analyses were done based on hydraulic characteristic of pipe network and supplementary data required for heat transfer calculation in equipment of preheated regenerative chain. Thermal analyses were done using MMS package and referred to normal operating regimes, namely, nominal operating regime required for calibration of calculating model, shutdown regime, start-up regime from zero power hot to nominal power and to abnormal operating regimes, namely, turbine trip, reactor trip and loss of two condensate pumps. The results were compared with already existing analysis and showed the largest differences at interface areas (i.e. 5%). This led US to idea of extending analysis to all secondary circuits in order to reduce the number of boundary conditions which can generate uncertainty in analysis. In this analysis we obtained an advanced model of preheated regenerative chain of secondary circuit in Cernavoda NPP which could be extended up to cover the whole secondary circuit by including the analysis of steam generators, turbine, and steam condenser. (authors)

  20. Public debates - key issue in the environmental licensing process for the completion of the Cernavoda NPP Unit 2

    International Nuclear Information System (INIS)

    Rotaru, Ioan; Jelev, Adrian

    2003-01-01

    SN 'NUCLEARELECTRICA' S.A., the owner of Cernavoda NPP, organized, in 2001, several public consultations related to environmental impact of the completion of the Cernavoda NPP Unit 2, as required by the Romanian environmental law, part of project approval. Public consultations on the environmental assessment for the completion of the Cernavoda NPP - Unit 2 took place in 2001 between August 15 and September 21 in accordance with the provisions of Law No. 137/95 and Order No. 125/96. Romanian environmental legislation, harmonization of national environmental legislation with European Union, Romanian legislative requirements, information distributed to the public, issues raised and follow-up, they all are topics highlighted by this paper and they are addressing the environmental licensing process of the Cernavoda 2 NPP. The public consultation process described fulfils all the Romanian requirements for carrying out meaningful consultation with its relevant shareholders. The process also satisfies EDC (Export Development Corporation - Canada) requirements for public consultation and disclosure with relevant shareholders in the host country. SNN is fully committed to consulting as necessary with relevant shareholders throughout the construction and operation of the Project. Concerns of the public have been taken into account with the operations of Unit 1 and will continue to be addressed during the Unit 2 Project

  1. Management of the used ion-exchangers contaminated with C-14 generated by NPP Cernavoda

    International Nuclear Information System (INIS)

    Boteanu, O.; Valeca, M.; Arsene, C.

    2016-01-01

    For the conditioning of ion-exchangers generated from operation of Cernavoda NPP Unit 1, techniques of direct immobilization in cement, bitumen and organic polymers have been experimented. The selected process for conditioning of spent resins is the bituminization. The bituminization process consists of the incorporation in bitumen of the spent resin, at temperatures between 110 and 1200C, and the solidification of the mixture by cooling. The percentage of incorporated spent resin in bitumen is ranged from 40 to 50% dry resin. The advantages of bituminization are: the bitumen is insoluble in water, the bituminization installation is simple, the matrix is not cost expensive, the temperature process is low, bitumen is compatible with wastes having various compositions, and the volume of the final product is smaller. The main disadvantage is that bitumen is combustible, although not easily flammable, and, at high temperature, interaction between bitumen matrix and chemical components, might occur. (authors)

  2. Reliability problems in the recirculated cooling water system at Cernavoda NPP and corrective maintenance operations adopted

    International Nuclear Information System (INIS)

    Bucur, Ionel; Metes, Mircea

    2002-01-01

    Between February 18 and March 5, 2002 the Unit 1 of Cernavoda NPP was shutdown in an un-planned outage necessary to repair a crack on the piping of the Recirculated Cooling Water System. The large pipe diameter and the requirement of maintaining the system in operation during the outage, imposed a special technology for fixing the leak (isolation of the line with ice plugs). The paper presents information about the performed repair work. After repair operations the failed duct was checked by non-destructive methods and the results were submitted and approved by regulation authorities. The repair was considered successfully completed and the Unit restarted on March 5, 2002 at 0.57 am when the electric generator was switched on in parallel to the national electric power system. (authors)

  3. Technical solutions for tritium removal from Cernavoda NPP heavy water systems

    International Nuclear Information System (INIS)

    Barariu, Gheorghe; Panait, Adrian

    2002-01-01

    In CANDU nuclear plants 2400 KCi/GW(e) - year tritium is generated. At a CANDU - 600 reactor similar to Cernavoda NPP Unit 1, 1500 KCi/year of tritium is generated 95% being in the D 2 O moderator, which can achieve a radioactivity level of 80 - 100 Ci/kg. Tritium in heavy water contributes with 30 - 50% to the doses received by operation personnel and with 20% to the radioactivity released to the environment. The extraction of tritium heavy water at CANDU reactors implies the following possibilities: - the radioactivity level reduction in the operation area; - the maintenance and repair cost reduction due to reduction of personnel protection measures and increased labor productivity; - the increase of NPP utilization factor by shutdown time reduction for maintenance and repair; - tritium concentration reduction from technological systems, ensuring thus the possibility of redesigning the systems in order to lower the cost of investment; - profitable use of extracted tritium. Technical measures provided by AECL project for CANDU 600 at Cernavoda make possible to satisfy the current standards concerning tritium concentration in the operation area atmosphere of 5 x 10 -6 Ci/m 3 . The regulations recommend that the radioactivity level should be maintained as low as possible in conformity with ALARA principles. Also, it is possible that norms will become more restrictive in the future, so the tritium removal technology is a good preventive measure which may become very necessary. The methods, which currently reached the industrial or pilot stages, are based on catalyzed chemical exchange, the heavy water electrolysis, and deuterium distillation. They are known as: VPCE - Vapour Phase Catalytic Exchange; LPCE - Liquid Phase Catalytic Exchange; DE - Direct Electrolysis; CD - Cryogenic Distillation. As transfer processes the catalyzed chemical exchange and heavy water electrolysis are used while concentration of tritium gas is done by cryogenic distillation. At present the

  4. Characterisation of radioactive waste at Cernavoda NPP Unit 1 during normal operation

    International Nuclear Information System (INIS)

    Iordache, M.; Bujoreanu, L.; Popescu, I. V.

    2008-01-01

    During the operation of a nuclear plant significant quantities of radioactive waste results that have a very large diversity. At Cernavoda NPP the important waste categories are non-radioactive wastes and radioactive wastes, which are manipulated completely different from which other. For a CANDU type reactor, the production of radioactive wastes is due to contamination with the following types of radioactive substances: - fission products resulting from nuclear fuel burning; - activated products of materials which form part of the technological systems; - activated products of process fluids. Radioactive wastes can be in solid, liquid or gas form. At Cernavoda NPP the solid wastes represent about 70% of the waste volume which is produced during plant operation and as a consequence of maintenance and decontamination activities. The most important types of solid wastes that are obtained and then handled, processed (if required) and temporarily stored are: solid low level radioactive wastes (classified as compact and non-compact), solid medium radioactive wastes, spent resins, used filters and filter cartridges. The liquid radioactive waste class includes organic liquids (used oil, scintillator liquids and used solvents) and aqueous wastes resulting from process system operating, decontamination and maintenance operations. Radioactive gas wastes occur subsequent to the fission process inside the fuel elements as well as due to the process fluids neutron activation in the reactor systems. As result of the plant operation, iodine, noble gases, tritium and radioactive particles occur and are passed to the ventilation stack in a controlled manner so that an exceeding of the maximum permissible concentrations of radioactive material to the environment should not occur. (authors)

  5. Estimation of the future nuclear power research in Romania, based on the present Cernavoda NPP evolution

    International Nuclear Information System (INIS)

    Dumitrache, Ion

    2001-01-01

    For more than four decades, the electric power needs of Romania were evaluated on the basis of the State Plan for Economic Development. To identify the optimal solution, the 'least price per produced MWh' was practically the only criterion. Now, there is no convincing estimation of the future economic development and at least two additional criteria play a significant role, 'the safety in the supply of the needed electric power', and 'the need of limiting the environmental impact of electricity generation'. The analysis dedicated to evaluation of future electric power solutions must take into account several features of the present situation. There are no available internal funds to finance the construction of new generating units of the order of several hundreds of MW. Even the so-called 'refurbishing' of the existing thermal power plants is based on foreign loan. In the 2000 year, about 80 electricity generation units reached 30 years of operation, i.e., the design life. Other thermal power plants proved very modest performances during 15-20 years of operation. Consequently, the future of almost 100 generating units is either in shutdown + decommissioning or shutdown + modernization situation. The Government analyzed the situation and decided to continue the completion of the Cernavoda NPP. The Unit 2 will be commissioned in a couple of years, and there is a schedule of negotiations relating the future of the Unit 3. After almost five years of successful operation of the Unit 1, the collaboration between RDT Institutes and NPP has clear features. Based on the experience related to this collaboration and taking into account the evolution of the Cernavoda NPP, we estimated that five research domains have significant chances to obtain a stable (and, hopefully, consistent) financial support. 1. Nuclear Safety, in particular Accident Analysis. As the Government re-iterated the firm decision to meet the conditions required for European integration, most of the nuclear

  6. Satellite infrared imagery for thermal plume contamination monitoring in coastal ecosystem of Cernavoda NPP

    Science.gov (United States)

    Zoran, M. A.; Zoran, Liviu Florin V.; Dida, Adrian I.

    2017-10-01

    Satellite remote sensing is an important tool for spatio-temporal analysis and surveillance of NPP environment, thermal heat waste of waters being a major concern in many coastal ecosystems involving nuclear power plants. As a test case the adopted methodology was applied for 700x2 MW Cernavoda nuclear power plant (NPP) located in the South-Eastern part of Romania, which discharges warm water affecting coastal ecology. The thermal plume signatures in the NPP hydrological system have been investigated based on TIR (Thermal Infrared) spectral bands of NOAA AVHRR, Landsat TM/ETM+/OLI, and MODIS Terra/Aqua time series satellite data during 1990-2016 period. If NOAA AVHRR data proved the general pattern and extension of the thermal plume signature in Danube river and Black Sea coastal areas, Landsat TM/ETM and MODIS data used for WST (Water Surface Temperature) change detection, mapping and monitoring provided enhanced information about the plume shape, dimension and direction of dispersion in these waters. Thermal discharge from two nuclear reactors cooling is dissipated as waste heat in Danube-Black -Sea Channel and Danube River. From time-series analysis of satellite data during period 1990-2016 was found that during the winter season thermal plume was localized to an area of a few km of NPP, and the mean temperature difference between the plume and non-plume areas was about 1.7 oC. During summer and fall, derived mean temperature difference between the plume and non-plume areas was of about 1.3°C and thermal plume area was extended up to 5- 10 km far along Danube Black Sea Channel.

  7. New appraisement of siting for a NPP on Mures river

    International Nuclear Information System (INIS)

    Traian Mauna

    2010-01-01

    The studies for a second NPP siting on inner Romanian rivers began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. The experience gained from Cernavoda NPP siting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the CANDU type NPP Cernavoda project to the new parameters of close water cooling circuit and of hard less or no rock foundation strata. The new sites conditions mean a lot of changes of CANDU license and a decrease the output power supplied to the national electric grid. The studies on the Mures river as alternative site of Olt river in Transylvania region began in 1986 and were stopped after 1990. This paper tries to reconsider shortly the old analysis focused on geological and geotechnical aspects and other local sites characteristics according to the last IAEA Safety Standards taking into account also the last types of NPP generations and the number of units. (author)

  8. Using residual tritiated water from Cernavoda NPP to study Danube - Black Sea Canal hydrodynamics

    International Nuclear Information System (INIS)

    Varlam, C.; Stefanescu, I.; Lazar, R.; Varlam, M.; Patrascu, V.; Bucur, C.; Bobric, E.

    2003-01-01

    By benefiting of Cernavoda NPP's location in the neighbourhood of Danube - Black Sea Canal one suggests extending the area of interest along this canal particularly to use the residual tritiated water from this CANDU type reactor as tracing means in the study of canal's hydrodynamics. This canal appears to be ideal for such a study because releases in normal operation of NPP are occasional. The tritiated water can be used for simulating the transport and dispersion of soluble pollutants because it has the same physical characteristics as the usual water. By measuring response curves produced at injecting a known amount of tracer one can developed an efficient method for estimating: the soluble pollutant velocity along the canal; attenuation rate of concentration peak as a function of time as well as the time required by the propagation front of the soluble pollutant to reach a given point along the canal. In this work the calculation of the mixture length as a function of the particular characteristics of the canal is presented as well as different experimental formulas. Also the reference level of tritium concentration in the investigated area is established for future experiments

  9. Cernavoda NPP Unit 1: Ensuring heat sink at very low Danube river levels

    International Nuclear Information System (INIS)

    Urjan, D.

    2005-01-01

    Full text: On August 24, 2003 the summer heat wave has caused the Danube River to drop to its lowest level in more than a century, forcing a government commission of experts and a team of technical specialists from Cernavoda NPP to close Romania's unique nuclear reactor in operation at Cernavoda. The paper presents some of the required actions needed for plant shutdown and ensuring adequate fuel cooling at very low suction bay levels, due to the Danube River level drop (Danube waters cools the reactor). The water level in the Danube River at Cernavoda village, where the reactor is located, fell to a depth of less than three meters (10 feet) on Saturday, down from its usual level of almost seven meters (23 feet). Consequently, the Unit 1 nuclear power plant was shut down Sunday due to this record drought, which left insufficient water to cool down the reactor. Operating Instruction procedures were elaborated in order to provide a logical sequence of actions when the bay level decreases under 2.25 m, or the estimated level after 3 days will be lower than 1.8 m. When Raw Service Water (RSW) is lost, Recirculated Cooling Water (RCW) will remain in service only for Moderator, ESC, HT Pumps, HT Purification, D/C Cooler, LAC's, and D 2 O Feed Pump. Alternate water sources, like potable water and water from the fire protection system were taken in consideration in order to ensure heat sink to the RCW loads. At the same time, in case of total loss of Class III and Class IV Power, and Stand-By Diesel Generators unavailable because of the loss of heat sink provided by the RSW, Emergency Power System (EPS) was configured to supply directly the Class III Power 6 kV bus (BUG bus). Economical Impact According to a report, closing the nuclear plant costs Romania $500,000 a day. The total cost includes also losses due to a 40 percent reduction in hydroelectric power generation due to reduced river flow. The country had to cease power exports until the reactor comes back on line

  10. Overview of the solid radioactive waste management programme for Cernavoda NPP

    International Nuclear Information System (INIS)

    Raducea, D.

    2001-01-01

    The wastes generated from nuclear power plants have a very large diversity, and can be grouped into non-radioactive and radioactive wastes. These two types are manipulated completely different ways from each other. Among radioactive wastes, solid radioactive wastes are important, because of their diversity, their method of treatment and of their volume compared to the others types. The strategy for their treatment and characterisation has a dynamic character and allows modification after the identification of new solutions at the international level, or after the production of new waste types. The Radioactive Waste Management concept for Cernavoda NPP established the general approach required for the collection, handling, conditioning and storage of radioactive wastes, while maintaining acceptable levels of safety for workers, members of the public and the environment. The radioactive waste management programme has the following major characteristics: plant operation at all times ensures that radioactive wastes are minimised; procedures are established to ensure that radiation doses to operating staff and members of the public are in accordance with ALARA and contamination from collection, transportation and storage of wastes are eliminated; all staff is trained and qualified to carry out their responsibilities. This presentation does not address the management of spent fuel, contaminated heavy water and the disposal of the solid radioactive wastes.(author)

  11. Analysis of electrical systems from Cernavoda NPP - Unit 1 based on commissioning activity

    International Nuclear Information System (INIS)

    Goia, M.L.; Manolescu, I.

    1996-01-01

    Several design solutions regarding the electrical part of Cernavoda NPP Unit 1 station auxiliaries are discussed in this paper. The solutions mentioned may have different variants which should be taken into consideration in the design of Units U2 - U5. This work offers an ample debate on such matters as the supply source connection of the station auxiliaries, the use of two different voltages for the mean voltage (MV) supply, the consequence of the lack of breakers on the 24 kV part of station auxiliary transformers T03 - T04, the protection devices non correlated with the breakers to which they react, as well as the consequences of low subtransient reactance of the new stand-by Diesel generators. Besides these design solutions that can influence the station auxiliaries reliability, matters as malfunctioning of the dry type MV/LV transformers and unreliable behaviour of some MV composite insulators are also discussed. For some of the above mentioned problems the authors proposed several solutions. (authors). 1 fig., 1 tab

  12. An integrated approach for investigation of failed nuclear fuel used at NPP Cernavoda Unit 1

    International Nuclear Information System (INIS)

    Tuturici, I.L.; Parvan, M.; Popov, M.; Dobrin, R.; Staicu, C.

    1996-01-01

    At NPP Cernavoda-Unit 1 the fuel surveillance and the defect detection system in operation are based on monitoring the coolant activity concentration and on measuring the flux of delayed neutrons emitted by some short-lived fission products. In order to identify the failed fuel underwater non-destructive examination has to be performed. The major interest for the availability of underwater examination consists in the necessity of a speedy acquisition of the data on failed fuel in operation and of appropriate follow-up actions to be taken. Often the identification operation will be followed by more detailed examinations on selected fuel rods in the hot cells of the Post-irradiation Examination Laboratory of the Institute for Nuclear Research at Pitesti. Transfer of selected fuel rods will be done by the use of a type B(U) road transportation cask. Such an integrated approach will help to keep the level of activity concentration of the primary circuit well below the authorized limits. (author). 2 figs., 1 tab., 2 refs

  13. Radiation shielding and dose rate evaluation at the interim storage facility for spent fuel from Cernavoda NPP

    International Nuclear Information System (INIS)

    Stanciu, Marcela; Mateescu, Silvia; Pantazi, Doina; Penescu, Maria

    2000-01-01

    At present studies necessary to license the Interim Storage Facility for the Spent Fuel (CANDU type) from Cernavoda NPP are developed in our country.The spent fuel from Cernavoda NPP is discharged into Spent Fuel Bay in Service Building of the plant, where it remains several years for cooling. After this period, the bundles of spent fuel are to be transferred to the Interim Storage Facility.The dry interim storage solution seems to be the most appropriate variant for Cernavoda NPP.The design of the Spent Fuel Interim Storage Facility must meet the applicable safety requirements in order to ensure radiological protection of the personnel, public and environment during all phases of the facility achievement. In this paper we intend to present the calculation of radiation shielding at the spent fuel interim storage facility for two technical solutions: - Concrete Monolithic Module and Concrete Storage Cask. In order to quantify the fuel composition after irradiation, the isotope generation and depletion code ORIGEN 2.1 has been used, taking into account a cooling time of 7 years and 9 years, respectively, for these two variants. The shielding calculations have been performed using the computer codes QAD-5K and MICROSHIELD-4. The evaluations refer only to gamma radiation because the resulting neutron source (from (α,n) reactions and spontaneous fission) is insignificant as compared to the gamma source. The final results consist in the minimum thickness of the shielding and the corresponding external dose rates, ensuring a design average dose rate based on national and international regulations. (authors)

  14. Experience in the application of S.A.T. for maintenance training at Cernavoda N.P.P. - U1

    International Nuclear Information System (INIS)

    Erdinici, Abdula

    1999-01-01

    A short history of Maintenance Training at Cernavoda NPP Unit 1 will be presented highlighting the fact that: - Cernavoda NPP Unit 1 is the first nuclear power plant in Romania; - Construction/Commissioning and initial operation was done under the direct supervision of expert specialists (from Canada, Italy and US). In addition, the application of Systematic Approach to Training (S.A.T.) principles at Cernavoda NPP for all training activities will be addressed. A short history of how maintenance training activity developed over time will be detailed to address the following issues: - how the S.A.T. stages were applied; - how maintenance experience was gained during Unit 1 Construction/Commissioning initial operation and how this experience has been evaluated, credited and transferred; - how maintenance training was documented; - how the maintenance training activity is organized; - on-the-job training for maintenance personnel. Concerning other training activities at Cernavoda NPP the maintenance begins with a training needs analysis for each maintenance position. These needs are documented through Job Related Training requirements (JRTR's) produced for each maintenance position. During commissioning/initial operation, only necessary maintenance training has been delivered, such as: pump alignments, use of maintenance procedure, application of maintenance documentation. The 'hands-on' activities under expatriates specialists supervision was the main training activity. Training coordinators for each maintenance activity (Mechanical, EI. I-and-C, and Services maintenance) have been appointed to administer maintenance training. Following the declaration of the unit in commercial operation, a new approach has been taken related to maintenance Bucharest A Task Force to evaluate maintenance training status and experience has been established. This group was initiated at the Training Department initiative and it was initially co-ordinated by a Canadian maintenance

  15. Management of tritium exposures for professionally exposed workers at Cernavoda 1 NPP

    Energy Technology Data Exchange (ETDEWEB)

    Chitu, Catalina; Simionov, Vasile [CNE-PROD Cernavoda NPP, No. 1, Medgidiei Str. Cernavoda 905200 (Romania)

    2004-07-01

    Operating experience to date of CANDU reactors has indicated that the major contributor to the internal dose of professionally exposed workers is the tritiated heavy water (DTO). CANDU reactors are both moderated and cooled by heavy water (D{sub 2}O). Tritium is produced in CANDU reactors by neutron reactions with deuterium, boron, and lithium and by ternary fission. Even small leaks from these systems can produce important contaminations with tritiated water vapours of the air in the reactor building and thus increased individual and collective internal doses. Professionally exposed workers are subject to a combination of acute and chronic tritium exposure and HTO dosimetry program at Cernavoda NPP is based on multiple sample results. The routine urine bioassay program performs the monitoring and dosimetry functions for DTO. A specialized laboratory using Liquid Scintillation Spectrometry methods currently determines tritium activities in urine samples. The frequency of biological samples submission depends on the tritium concentration in the last sample. Dose assignments resulting from routinely measured weekly and monthly urinary levels of tritium oxide are based on the method of linear interpolation unless it is known that there has been no exposure between samples (vacation). All information about these doses is stored into a dedicated electronic database and used to make periodical reports and to ensure that the legal and administrative individual and annual limits are not exceeded. A chronic unprotected exposure to small tritium dose rate (< 50{mu}Sv/h) may lead to internal doses that exceed the intervention level. In case of acute exposure an increased daily water intake combined with a proper medical intervention could reduce the effective half time of tritium 2-3 times. (authors)

  16. Installing the detritiation facility at Cernavoda NPP. Technical solutions and national participation

    International Nuclear Information System (INIS)

    Barariu, Gheorghe

    2002-01-01

    Generation and accumulation almost linear of tritium in the heavy water used as moderator and coolant in CANDU type reactors appears to be a drawback with implication upon the long term operation of the nuclear station. In the CANDU type reactors about 2400 kCi/GW(e) of tritium is generated annually. In case of CANDU-600 reactors as, those operating at Cernavoda NPP, the amount of tritium generated is 1500 kCi/y from which about 95% is found in moderator water what leads to an activity level of about 80-100 Ci/kg. Due to the specific working conditions about 85 Mg/y of D 2 O are eliminated from the circuits of which some 95% is recovered. About 30-50% of the radiation dose to which the operation personnel is exposed is due to the tritium from heavy water, while its contribution to the radioactivity released in the environment is about 20%. Detritiation ensures a radioactivity level due to the tritium contained in the moderator heavy water of about 5 Ci/kg in D 2 O moderator and about 1 Ci/kg in the coolant. Consequently, the radiation dose due to tritium is reduced three times while the tritium amount released in the environment is diminished by about 10 times. At present, the price of tritium is 2-3 USD/Ci what means that the tritium recovered from a CANDU reactor could reach a value of about USD 3 - 4.5 million/y. The detritiation procedures are based on catalyzed chemical exchange, heavy water electrolysis and deuterium distillation. Following experimentations and cost/benefit analyses the Institute for Cryogenics and Isotopic Technologies, ICSI, at Rm. Valcea, adopted for detritiation the procedure LPCE - CD, i.e. Liquid Phase Catalytic Exchange - Cryogenic Distillation. The procedure allows tritium transfer from the heavy water in gaseous deuterium in a column equipped with hydrophobic catalyst and phosphorous bronze packing. In the second stage of the technological process, the tritium is extracted from the gaseous phase by liquid deuterium distillation and

  17. Economic viability of Cernavoda project

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.; Chirica, T.; Glodeanu, F.

    1998-01-01

    Cernavoda project started in 1978, when the CANDU technology procurement contract and other contracts for engineering, technical assistance and procurement were signed with AECL. The works on site started in 1980. In February 1981, a contract was signed with GE - USA and Ansaldo - Italy for balance of plant. After 1989 the concept for project implementation was essentially changed. The completion of Cernavoda NPP Unit-1, established as the first priority by Romanian authorities was implemented by AECL-Ansaldo Consortium (AAC). The objective of the contract signed with AAC consisted in overtaking the management of Cernavoda Unit-1 project, in order to complete, commission and operate the plant for 18 months. The plant was successfully completed, commissioned and commercially operated since December 2, 1996. As concerns Unit-2, only preservation and some remedial works were performed since 1991. In order to support the decision to complete Unit-2, a complete process was initiated: - identification of the activities and associated costs required for plan completion; - plant integration in the utility's least cost development study; - Unit-2 cash flow analysis. A joint RENEL-AECL-ANSALDO team performed a detailed analysis using Cernavoda Unit-1 as reference project and taking advantage of the experience gained during construction, commissioning and operation of the first unit. The least cost power generation development study finalized by SEP and EDF, based on a PHARE funding, ranked Cernavoda Unit-2 on the second place, after two small hydroelectric plants of 53 and 8 Mw e. A cash flow model developed by a RENEL-ANSALDO joint team shows that Cernavoda Unit-2 is an economically feasible project. The financing scenario provides that all resources will be from loans. Other arguments for completion of Cernavoda Unit-2 are: - good performances in operation of Unit-1; - the need to provide jobs for the specialists in the nuclear field; - opportunity for electricity export

  18. NPP Cernavoda unit 2 economic viability: The challenge for an advanced financing scheme

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.

    1999-01-01

    The completion of Cernavoda Unit-2 being no doubt, the viability of the project was analyzed and strengthened. Economic justification of the decision to complete Unit-2 is described, including assessment of its safety design guides, design requirements and engineering design solutions in the light of changes in codes, guideline, standards and actual regulatory requirements. Cost-benefit analysis demonstrates the economic viability of the project

  19. Time depending assessment of low and intermediate radioactive waste characteristics from Cernavoda NPP

    International Nuclear Information System (INIS)

    Mateescu, S.; Pantazi, D.; Stanciu, M.

    2002-01-01

    Low and intermediate radioactive gaseous, liquid and solid waste produced at Cernavoda Nuclear Power Plant must be well known from the point of view of contained radionuclide activity, during all steps of their processing, storage and transport, to ensure the nuclear safety of radioactive waste management. As in intermediate storage stage, the waste activity changes by radioactive decay and nuclear transmutation, the evolution in time of these sources is necessary to be assessed, for the purpose of biological shielding determination at any time. On the other hand, during the transport of waste package at the repository, the external dose rates must meet the national and international requirements concerning radioactive materials transportation on public roads. In this paper, a calculation methodology for waste characterization based on external exposure rate measurement and on sample analysis results is presented. The time evolution of waste activity, as well as the corresponding shielding at different moments of management process, have been performed using MICROSHIELD-5 code. The spent resins proceeded from clean-up and purification systems and solutions from decontamination have been analyzed. The proposed methodology helps us to assess radiation protection during the handling of low and intermediate - level radioactive waste drums, ensuring safety conditions for the public and environment.(author)

  20. The settlement Cernavoda III culture on the site Bubanj near Niš

    Directory of Open Access Journals (Sweden)

    Milanović Dragan

    2011-01-01

    Full Text Available Archaeological investigations carried out between 2008 and 2010 in the east sector of site Bubanj near Niš (Plan 1; Figs. 1-3 confirmed the existence of horizon of the Cernavoda III culture. In features 22, 23 and 31, which are the remains of settlement buildings, have been found archaeological material mostly pottery vessels, which according to style of decoration, technological and morphological characteristics could be ascribed to the initial period of late Eneolithic. Also, the dwelling structures of Krivodol-Salcuþa-Bubanj cultural complex have been recorded in the layer of brown soil with the remains of above mentioned Cernavoda III buildings. In the vertical stratigraphy of trench I (Fig. 4 the mentioned layer was encountered immediately under the layer of whitish/gray ashy soil and thin layer of compact soil of gray color (Fig. 5, which date from the advanced phases of the late Eneolithic and above the early Eneolithic layers. The settlement features recorded during 2009 excavations are parts of the structures from the settlement of Cernavoda III culture (Fig. 6; T. I-III. Feature 22 is section of devastated probably aboveground building, feature 23 is shallow pit and feature 31 is most probably the rubbish pit. Very similar stratigraphy of the site had been recorded by investigations of M. Garašanin in 1954. In the layer of brown soil, the material of Cernavoda III culture was discovered in level III, and in level IV both Cernavoda III and the material of the earlier Krivodol-Salcuþa-Bubanj cultural complex was recorded. These building horizons are at different depths within approximately same area of the trench and have been identified on the basis of considerable amount of daub and stone, two floor levels, wooden building material and fragmented pottery vessels (T. IV-VI. Despite the lack of technical field documentation remains of one above ground structure could be identified at level III according to descriptions from field

  1. Development of new process network for gas chromatograph and analyzers connected with SCADA system and Digital Control Computers at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Deneanu, Cornel; Popa Nemoiu, Dragos; Nica, Dana; Bucur, Cosmin

    2007-01-01

    The continuous monitoring of gas mixture concentrations (deuterium/ hydrogen/oxygen/nitrogen) accumulated in 'Moderator Cover Gas', 'Liquid Control Zone' and 'Heat Transport D 2 O Storage Tank Cover Gas', as well as the continuous monitoring of Heavy Water into Light Water concentration in 'Boilers Steam', 'Boilers Blown Down', 'Moderator heat exchangers', and 'Recirculated Water System', sensing any leaks of Cernavoda NPP U1 led to requirement of developing a new process network for gas chromatograph and analyzers connected to the SCADA system and Digital Control Computers of Cernavoda NPP Unit 1. In 2005 it was designed and implemented the process network for gas chromatograph which connected the gas chromatograph equipment to the SCADA system and Digital Control Computers of the Cernavoda NPP Unit 1. Later this process network for gas chromatograph has been extended to connect the AE13 and AE14 Fourier Transform Infrared (FTIR) analyzers with either. The Gas Chromatograph equipment measures with best accuracy the mixture gases (deuterium/ hydrogen/oxygen/nitrogen) concentration. The Fourier Transform Infrared (FTIR) AE13 and AE14 Analyzers measure the Heavy Water into Light Water concentration in Boilers Steam, Boilers BlownDown, Moderator heat exchangers, and Recirculated Water System, monitoring and signaling any leaks. The Gas Chromatograph equipment and Fourier Transform Infrared (FTIR) AE13 and AE14 Analyzers use the new OPC (Object Link Embedded for Process Control) technologies available in ABB's VistaNet network for interoperability with automation equipment. This new process network has interconnected the ABB chromatograph and Fourier Transform Infrared analyzers with plant Digital Control Computers using new technology. The result was an increased reliability and capability for inspection and improved system safety

  2. The licensing process of the design modifications of Cernavoda 2 NPP resulting from the operating experience of CANDU plants

    International Nuclear Information System (INIS)

    Goicea, L.

    2005-01-01

    The CANDU 6 plant now under construction in Cernavoda include over two hundred significant improvements made in order to comply with current codes and standards and licensing requirements relative to the operating CANDU 6 in Romania. These evolutionary improvements are incorporated in CANDU 6 design taking advance of CANDU operating experience, of the designer company research and development and technical advances worldwide in order to further enhance safety, reliability and economics. This paper gives a general idea of the evaluation of the modifications of the Cernavoda 2 nuclear power plant against the design of Cernavoda 1 and states the safety principles and requirements which are the basis for this evaluation. (author)

  3. Design configuration for Cernavoda - 2

    International Nuclear Information System (INIS)

    Lindsay, R.I.; Keil, H.; Hapwood, J.M.; Hum, J.

    1998-01-01

    The Cernavoda - 2 NPP project is based on a repeat of the recently completed plant, Cernavoda - 1 NPP which has been operating well, and the other CANDU 6 units in Canada, Argentina and Korea, which have had an excellent operating record. The reference plant design for Cernavoda - 2 is Cernavoda - 1 with appropriate design enhancements incorporating lessons learned from CANDU 6 and other nuclear operations, and including appropriate design enhancements from the most recent CANDU 6 projects at Wolsung in Korea, and Qinshan in China, while recognizing the significant degree of project completion. The results of this combination of proven design with systematic design feedback, will be a unit which combines reliability supported by the many years of successful operation of CANDU 6 units, together with a significant number of design enhancements. (authors)

  4. The impact of the internalisation of the decommissioning costs at Cernavoda NPP

    International Nuclear Information System (INIS)

    Metes, Mircea; Goicea, Andrei

    2004-01-01

    The 'decommissioning of the nuclear power plant' means to release the site where a nuclear installation has been operated in such manner that this site could be further used, without any restriction, by the present or future generations. This is an important and complex requirement related to sustainable development. The decommissioning is a complicated and costly process; therefore it is imperative to start its preparation as early as possible, to ensure the creation of the necessary financial resources and to carefully schedule all the phases to be performed after the plant's permanently shutdown. The paper presents different possible strategies for the decommissioning, recommended by the International Atomic Energy Agency-Vienna, as well as some elements of the decommissioning experience acquired in the world. Special attention is given to the issue of the financial resources which must be provided by the nuclear power plant, during its operational life, with the corresponding impact on the cost of the electrical energy delivered by the plant. The practice of the internalization of the decommissioning costs is worldwide accepted; it is an approach specific to nuclear sector, proving once more its compatibility with the environmental protection and sustainable development. The sustainable development consists in such solutions that are able to satisfy the needs of the present generation without hampering the ability of the future generations to satisfy their own needs. In the nuclear energy sector, sustainability is provided by the following specific features: (1) Nuclear energy was and shall be in the future an important factor in security of energy supply. Due to the availability of the primary energy resources (fissile and fertile materials), nuclear electricity is and shall be accessible at affordable price on a permanent and reliable basis. (2) Nuclear energy as a part of the energy mix can diminish non-renewable energy consumption, prevent the exhaustion of

  5. Influence of the crustal and subcrustal Vrancea seismic sources on Cernavoda nuclear power plant site

    International Nuclear Information System (INIS)

    Marmureanu, Gheorghe; Popescu, Emilia; Mircea Radulian

    2002-01-01

    The basis of the seismic hazard assessment in different geographical regions with dense-populated areas and strategic objectives (dams, nuclear power plants, etc.) is the study of seismicity of the seismogenic sources which affect these sites. The purpose of this paper is to provide a complete set of information relative to the Vrancea seismic source (in the crust and the intermediate depth domains) that is fundamental for the seismic hazard evaluation at Cernavoda nuclear power plant site. The analysis that we propose has to deal with the following items: (1) geometrical definition of the seismic sources; (2) setting the earthquake catalog associated to each seismic source; (3) estimation of the maximum possible magnitude; (4) estimation of the frequency - magnitude relationship; (5) computation of the distribution function for focal distance; (6) correlation between focal depth and magnitude; (7) attenuation law. We discuss also the implications of the model parameters on the seismic hazard level. (authors)

  6. Customization of RODOS 5.0 system for the assesment of a CANDU Cernavoda NPP nuclear accident scenario

    International Nuclear Information System (INIS)

    Mateescu, Gh.; Galeriu, D.; Slavnicu, D.; Vamanu, D.; Craciunescu, T.; Turcanu, C.; Melintescu, C.A.; Gheorghiu, D.; Gheorghiu, A.

    2003-01-01

    The RODOS expert system is designed to be run in real time and on-line for multiuser operation in local, regional and national nuclear emergency centers responsible for off-site nuclear emergency management. RODOS provides continuously updated, consistent, comprehensive and timely information as an input for making decisions at local, national and European scale, in early or late phase of an accident, for all types of actions and countermeasures in an emergency situation. For testing the customization of RODOS in prototype version 5.0 to Romanian conditions an accident scenario for CANDU reactor was considered. This accident scenario is the early reactor core disruption with hydrogen burning. For customization a more detailed geographic database was created and was updated according to the radioecological database for our country. The goal of testing is to assess the accident consequences in early phase and also the banning, processing and disposal of agricultural products. One figure presents the evacuation zone and a second one shows the iodine tablet intake (for children). Another application was the estimation of HTO concentration and OBT (organic bound tritium) in cow's milk and also the tritium ingestion dose, having in view that CANDU reactor is an important source of tritium in the case of an accidental release. Other important estimations regard the assessment of concentration of important radionuclides as Cs-137, I-131 and Sr-90 which has an important impact on organs like muscles, thyroid and bones. In case of countermeasures for long term it is very important to estimate the number of persons to be relocated as well as the relocation lapse. The system provides economic estimations corresponding to different countermeasure strategies regarding the costs of food consumption and decontamination activities of radioactively contaminated regions. RODOS is adapted to evaluate accident or incident consequences for all nuclear risk zones in Romania (Cernavoda

  7. Degradation tests for C 32/40 concrete used for perimetral wall, reactor base and components of Cernavoda NPP containment, under thermal stress conditions and liner degradation

    International Nuclear Information System (INIS)

    Carlan, P.; Paraschiv, I.; Dinu, A.; Stanciulescu, M.; Olteanu, A. M.; Voica, I.; Stelian, R.; Buc, G.

    2016-01-01

    In order to evaluate the effect of thermal degradation on C 32/40 concrete used in nuclear constructions at Cernavoda NPP, continuous thermal stress tests were performed at 65, 80 and 100°C and cyclic thermal stress tests at 65°C in dry conditions. This paper presents the macroscopic properties of concrete, obtained after these treatments and also the microstructural changes that occur in the cement paste from the concrete composition, which has been tested in the same conditions as the concrete samples. Determinations performed for macroscopic properties of concrete included: compressive strength, loss of density, permeability and modulus of elasticity. Cement paste samples were analysed by XRD (for mineralogical composition) and SEM (for morphology). The obtained results shown an appropriate behaviour of the concrete used in this study; changes are insignificant and follow the normal evolution process of concrete, proving that concrete will preserve its safety functions, as part of the containment structure. (authors)

  8. Seismic characterization of the NPP Krsko site

    International Nuclear Information System (INIS)

    Obreza, J.

    2000-01-01

    The goal of NPP Krsko PSA Project Update was the inclusion of plant changes (i.e. configuration/operational related) through the period January 1, 1993 till the OUTAGE99 (April 1999) into the integrated Internal/External Level 1/Level 2 NPP Krsko PSA RISK SPECTRUM model. NPP Krsko is located on seismotectonic plate. Highest earthquake was recorded in 1917 with magnitude 5.8 at a distance of 7-9 km. Site (founded) on Pliocene sediments which are as deep as several hundred meters. No surface faulting at the Krsko site has been observed and thus it is not to be expected. NPP Krsko is equipped with seismic instrumentation, which allows it to complete OBE (SSE). The seismic PSA successfully showed high seismic margin at Krsko plant. NPP Krsko seismic design is based on US regulations and standards

  9. Near Regional and Site Investigations of the Temelin NPP Site

    International Nuclear Information System (INIS)

    Prachar, Ivan; Vacek, Jiri; Heralecky, Pavel

    2011-01-01

    The Temelin NPP is worldwide through heated discussion with nuclear energetic opposition. In addition this discussion goes beyond a border of the Czech Republic. On the other side, results of several international supervisions shown that Temelin NPP is fully comparable with the safest nuclear power plants in the world regarding its technical design and safety functions. This presentation deals with the near regional and site investigations of the Temelin NPP Site. It must be noted that although the Temelin site is situated in the area with low seismicity, item of seismicity is a basic argument against Temelin NPP and therefore a detail seismic hazard assessment was performed

  10. Low-water considerations for NPP sites

    International Nuclear Information System (INIS)

    Jensen, J.; Frank, T.; Wahl, T.

    2009-01-01

    In the frame of reactor safety considerations flood protection and the evaluation of low-water events are safety relevant issues. Therefore low-water statistics were performed for the coastal region Cuxhaven and the Elbe river estuary. The consideration of the longitudinal profile of water levels during low-tide in connection with surface water effects, morphodynamic changes of the river and anthropogenic modifications is of importance for conclusions concerning the NPP sites in some distance of the reference tide gauge. The authors performed a statistical low-tide analysis for the NPP sites Brunsbuettel and Brokdorf.

  11. Considerations related to plant life management for Cernavoda-1

    International Nuclear Information System (INIS)

    Cojan, Mihail

    2002-01-01

    Cernavoda-1 NPP, the first CANDU 6 Unit in Eastern Europe, is one of the original five CANDU 6 plants and the first CANDU 6 producing over 700 MWe. CANDU Pressurized Heavy Water Reactors (PHWR) continues to play a significant role in electricity supply both in Canada and some offshore countries (Korea, Argentina, Romania). The commercial versions of CANDU reactors were put into service more than 30 years ago. While the first series of CANDU 6 plants (which entered service in the early 1980's) have now reached the middle portion of their 30 years design life, the Cernavoda-1 was put into service on 2 December 1996. However, the Cernavoda-1 Plant Life Management should be an increasingly important program to Utility ('CNE-Prod') in order to protect the investment and the continued success of plant operation. Over the past three years, INR (Institute for Nuclear Research - Romania) has been working with AECL-Canada on R and D Programs to support a comprehensive and integrated Cernavoda-1 Plant Life Management (PLiM) program that will see the Cernavoda-1 NPP successfully and reliably through to design life and beyond. The PLiM program has a focus on critical systems, structures, and components (CSSCs) and will be applied in three phases: Phase 1 - Planning (assessment and recommendations); Phase 2 - Life attainment implementation, and; Phase 3 - Plant Life Extension (PLEx), also known as plant extended operation. The key activities during each phase are shown. The schedule of each Phase are shown using the in service date of 1983 as the basis. This schedule applies to three original CANDU 6 plants with an in-service date of 1983: Point Lepreau, Gentilly-2, Wolsong-1 and shortly thereafter (1984) the 4th original CANDU 6 Embalse NPP was declared in service. Cernavoda-1 is the 5th original CANDU 6 plant and was put into service on 2 December 1996 (on site activities were started in 1980). The paper will describe the elements of an integrated program, the multiphase

  12. Cernavoda Unit 2: - BOP 3D model proposal for a possible organization of site activities

    International Nuclear Information System (INIS)

    Ghiesura, G.; Scarsin, Sioli; Orlandi, S.

    1999-01-01

    The scope of this activity is to define characteristics and advantages of the 3D model of Cernavoda BOP to this set up at site for engineering and construction activities. This model will provide a modern and proven tool able to strongly support the site activities with particular regard to the following: 1. engineering activities, - plant arrangement 'double check' for resolution of clashing; - easy management of future design changes; - real time plant configuration updating as soon as any design modification is approved and integrated in the model; - preparation of high quality documentation for procurement, construction and commissioning; - prompt availability of the as built configuration of the plant as soon as the last modification is frozen; 2. material procurement activities, - definition of the priorities in the construction material procurement according to the construction planning by area; - inventory list of equipment, pipes, fittings, valves, cable trays and ventilation ducts to be installed in each construction area; 3. construction activities, - definition of construction sequences, with particular reference in the congested areas, for piping cable trays (electrical and C-and-I) and ventilations ducts; - definition of piping spools by construction contractors; - follow-up of the activities in each area (i.e. construction, painting, insulation, flushing, pressure testing, etc); 4. turn-over and commissioning, - check of the progress. The success of this approach is based on the following: i) proper management of the remote workstations providing easy and reliable access to the model; ii) subdivision of the Integrated Building in construction areas, whose detail design may be allotted to Romanian organizations with multidisciplinary tasks; iii) integration in the model of the remote developed engineering in order to validate the details of the design. (authors)

  13. Probabilistic safety assessment (Cernavoda). Experience and strategies

    International Nuclear Information System (INIS)

    Mircea, Mariana

    2000-01-01

    An IAEA project named 'Support for PSA related activities for Cernavoda NPP' was agreed at the beginning of 2000. The objectives were: upgrading of capability and framework to perform deterministic analyses as support for PSA (accident analyses and severe accident analyses); upgrading of capability and framework to extend the scope of PSA model for Cernavoda NPP to include internal and external hazards (internal fire, internal flooding, earthquake); upgrading of capability and framework to perform the Level 2 PSA for Cernavoda NPP. valuation was done for the status of the development of the seismic PSA, fire PSA and flooding PSA. For seismic PSA it was concluded by IAEA experts that this work needs adequate human and financial resources. Decision was taken to coordinate this project from Cernavoda but using specialists from external institutions. A Fire Hazard Assessment-FHA is in progress for Unit 1. First stage, regarding the methodology, was reviewed by IAEA experts in November 1999. In present, work is done for Reactor and Service Buildings. Work on flooding PSA was not started yet. To extend the PSA scope: Capability will be extended to develop the seismic PSA, fire PSA, flooding PSA (procurement of supplementary computer codes and specialist training); the extension of PSA scope to include internal and external hazards will continue after the completion of deterministic studies and is expected that the effective inclusion in the PSA model will start at the end of 2002

  14. Hydrodynamics and sediment transport at Muria Peninsula NPP Site

    International Nuclear Information System (INIS)

    Heni Susiati; Berni A Subki; Harman A

    2011-01-01

    Coastal along the coast of the Muria Peninsula, particularly the location of the Muria NPP site candidate is a dynamic region, the interaction between physical oceanographic factors such as currents, waves and tides in the coastal sediments cause abrasion or accretion. Interactions have resulted in coastal dynamics needs to be considered in siting NPP is essential in order to plan. Capacity of hydro-oceanographic data is essential in order to plan the development of the Muria NPP. The process of selecting a safe site for hydro-oceanographic aspects carried out according to IAEA safety standards on site selection. For the evaluation stage of hydro oceanographic potential site (site survey stage), the analysis is more focused on the tidal along the northern coast, bathymetry, potential water resources and hydrologic systems in the Muria NPP siting locations, Jepara. The method used is a secondary, confirmation of field data collection and interpretation of modeling results. The results showed that the preparation for the construction of NPP need to be evaluated further to coastal conditions with respect to the increase coastal erosion in the area of prospective NPP siting. (author)

  15. Selection of suitable sites for NPP in Slovenia (stage 3)

    International Nuclear Information System (INIS)

    Grgic, M.; Fabjan, L.; Premru, U.

    1977-01-01

    Selection of suitable sites for nuclear power plants in Slovenia is considered. This includes the studies of available data on regional and local characteristics specified in general site suitability criteria for NPP. The most suitable selected sites will be included into land use urbanistic planning of Slovenia

  16. Chernobyl NPP decommissioning efforts - Past, Present and Future. Decommissioning Efforts on Chernobyl NPP site - Past, Present

    International Nuclear Information System (INIS)

    Kuchinskiy, V.

    2017-01-01

    Two unique large-scale projects are underway at the moment within the Chernobyl - Exclusion zone - Shelter object transformation into ecologically safe system and the decommissioning of 3 Chernobyl NPP Units. As a result of beyond design accident in 1986 the entire territory of the industrial site and facilities located on it was heavily contaminated. Priority measures were carried out at the damaged Unit under very difficult conditions to reduce the accident consequences and works to ensure nuclear and radiation safety are continuous, and the Unit four in 1986 was transformed into the Shelter object. Currently, works at the Shelter object are in progress. Under assistance of the International Community new protective construction was built above the existing Shelter object - New Safe Confinement, which will ensure the SO Safety for the long term - within up to 100 years. The second major project is the simultaneous decommissioning of Chernobyl NPP Units 1, 2 and 3. Currently existing Chernobyl NPP decommissioning Strategy has been continuously improved starting from the Concept of 1992. Over the years the following was analyzed and taken into account: the results of numerous research and development works, international experience in decommissioning, IAEA recommendations, comments and suggestions from the governmental and regulatory bodies in the fields of nuclear energy use and radioactive waste management. In 2008 the final decommissioning strategy option for Chernobyl NPP was approved, that was deferred gradual dismantling (SAFSTOR). In accordance with this strategy, decommissioning will be carried out in 3 stages (Final Shutdown and Preservation, Safe Enclosure, Dismantling). The SAFSTOR strategy stipulates: -) the preservation of the reactor, the primary circuit and the reactor compartment equipment; -) the dismantling of the equipment external in relation to the reactor; -) the safe enclosure (under the supervision); -) the gradual dismantling of the primary

  17. Cernavoda - Unit 2. A strategic project for Romania

    International Nuclear Information System (INIS)

    Saroudis, J.I.; Chirica, T.; Villabruna, G.

    1999-01-01

    The paper presents some key aspects of the Romanian nuclear program, focusing on Cernavoda NPP Unit No. 2 and the partnership with Atomic Energy of Canada Ltd. (AECL) and ANSALDO Italy for completion of this project. A brief historical presentation of the Romanian nuclear program is included. The success of Cernavoda NPP Unit 1 represents an important element in finalizing Unit 2 in an advanced state of equipment installation and more than 40 % complete. Also, the national infrastructure, including the legal framework and new Electricity Law represents a positive element for Project completion. The Romanian Nuclear Regulatory Body represents the guarantee for the safe operation of CANDU reactors in Romania.(author)

  18. Autoevaluation process at SNN SA-CNE PROD Cernavoda

    International Nuclear Information System (INIS)

    Florescu, N.

    2005-01-01

    Implementation of the autoevaluation process requires identification of the activities carried with performance under the limits imposed by international standards. The following activity areas were established for autoevaluation at Cernavoda NPP: 1. General activities; 2. Operation activities; 3. Work control; 4. Maintenance activities; 5. Preparing activities; 6. Technical activities; 7. Radioprotection activities; 8. Emergency plans; 9. Environment control activities; 10. Chemical control; 11. Materials control; 12. Physical protection; 13. Document control; 14. Fuel manipulation. In order to improve the performances at Cernavoda NPP the WANO autoevaluation model was adopted

  19. Improving in organization of in-site planning for NPP

    International Nuclear Information System (INIS)

    Gitel'man, L.D.; Khanin, V.V.; Trunov, V.M.; Khanin, R.V.

    1986-01-01

    The organization of NPP section activity planning is considered. With regard to the structure of in-site plans by time and content, their distribution in organization control structure, order of plan development, stimulation, accounting and estimation of plan fulfillment, plan indices for each shop and plan-assignment form are developed

  20. Disposal of the radioactive contaminated soils from the NPP site

    International Nuclear Information System (INIS)

    Matusek, I.; Plsko, J.; Sajtlava, M.; Hulla, J.; Kovacs, T.

    2004-01-01

    Disposal of contaminated soils at site of NPP is one of the most important task within the frame of research and development tasks of the NPP decommissioning. The works within this field can be seen in several areas. Considered soil activity monitoring, observation of its geo-technical and geo-chemical parameters, volume balance, research of the radio nuclides behaviour in the soil and simulation of their influence on the surrounding environment with special emphasis on underground water, project studies and construction of the disposal facility for contaminated soils. This work presents overview of gained results in the mentioned areas of the research and development. (author)

  1. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  2. Probabilistic site dependent design spectra for a NPP

    International Nuclear Information System (INIS)

    Chavez, M.; Arroyo, M.; Romo, M.P.

    1985-01-01

    A methodology is proposed to compute the design spectra for a NPP site. Near field earthquakes are included by using an appropriately scaled sample of response spectra. Site effects are considered through a probabilistic site response analysis in the frequency domain which considers nonlinear behaviour of soils. The uncertainties of the soil shear modulus, G, are introduced by using Rosenblueth's point estimates. Strong motion duration is treated by using sensitivity analysis. The procedure is applied to a NPP site and the results are: a) the USNCR R.G.1.60 underestimate the spectral amplitudes for frequencies of interest; b) the omission of the uncertainties on the G leads to under or over-estimate the spectral amplitudes at certain frequency bands; c) the effect of considering the actual strong motion duration instead of an average value is to reduce the peak spectral amplitudes by a ten per cent. (orig.)

  3. Geological-Hydrological Site Evaluation for NPP Planning

    Energy Technology Data Exchange (ETDEWEB)

    Faust, Brigitte; Mini, Paolo [Nordostsschweizerische Kraftwerke AG NOK, Parkstrasse 23, 5401 Baden (Switzerland)

    2008-07-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  4. Geological-Hydrological Site Evaluation for NPP Planning

    International Nuclear Information System (INIS)

    Faust, Brigitte; Mini, Paolo

    2008-01-01

    NOK is investigating the potential replacement of the current NPP in Beznau. In order to meet the requirements with respect to a general licence application, geological, seismological, and geotechnical engineering, but also hydrological boundary conditions have been defined. These conditions define the nature of necessary investigations to obtain the geological, seismic, geotechnical and hydrological data themselves forming the basis to determine the site suitability. Viability has to be provided that a NPP can be built and operated at the proposed site without compromising public health, safety and environment. The collected data are also the basis for the design of all safety relevant structures, systems, and components. For example, the latter have to withstand the effects of natural phenomena such as earthquakes and human induced impact such as airplane crash without loosing their capability to perform the assigned safety functions. (authors)

  5. NPP site selection: A systems engineering approach

    Energy Technology Data Exchange (ETDEWEB)

    Pwani, Henry; Kamanja, Florah; Zolkaffly, Zulfakar; Jung, J. C. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2012-10-15

    The necessity for improved decision making concerning the siting and licensing of major power facilities has been accelerated in the past decade by the increased environmental consciousness of the public and by the energy crisis. These problems are exceedingly complex due to their multiple objective nature, the many interest groups, the long range time horizons, and the inherent uncertainties of the potential impacts of any decision. Along with the relatively objective economic and engineering concerns, the more subjective factors involving safety, environmental, and social issues are crucial to the problem. The preferences of the general public, as consumers, the utility companies, as builders and operators of power plant facilities, and environmentalists and the government must be accounted for in analyzing power plant siting and licensing issues. We advocate for a systems engineering approach that articulates stake holder's requirements, expert judgements, and a systems decision making approach. The appropriateness and application of systems decision making process is illustrated in this paper.

  6. NPP site selection: A systems engineering approach

    International Nuclear Information System (INIS)

    Pwani, Henry; Kamanja, Florah; Zolkaffly, Zulfakar; Jung, J. C.

    2012-01-01

    The necessity for improved decision making concerning the siting and licensing of major power facilities has been accelerated in the past decade by the increased environmental consciousness of the public and by the energy crisis. These problems are exceedingly complex due to their multiple objective nature, the many interest groups, the long range time horizons, and the inherent uncertainties of the potential impacts of any decision. Along with the relatively objective economic and engineering concerns, the more subjective factors involving safety, environmental, and social issues are crucial to the problem. The preferences of the general public, as consumers, the utility companies, as builders and operators of power plant facilities, and environmentalists and the government must be accounted for in analyzing power plant siting and licensing issues. We advocate for a systems engineering approach that articulates stake holder's requirements, expert judgements, and a systems decision making approach. The appropriateness and application of systems decision making process is illustrated in this paper

  7. Bouguer density analysis using nettleton method at Banten NPP site

    International Nuclear Information System (INIS)

    Yuliastuti; Hadi Suntoko; Yarianto SBS

    2017-01-01

    Sub-surface information become crucial in determining a feasible NPP site that safe from external hazards. Gravity survey which result as density information, is essential to understand the sub-surface structure. Nevertheless, overcorrected or under corrected will lead to a false interpretation. Therefore, density correction in term of near-surface average density or Bouguer density is necessary to be calculated. The objective of this paper is to estimate and analyze Bouguer density using Nettleton method at Banten NPP Site. Methodology used in this paper is Nettleton method that applied in three different slices (A-B, A-C and A-D) with density assumption range between 1700 and 3300 kg/m"3. Nettleton method is based on minimum correlation between gravity anomaly and topography to determine density correction. The result shows that slice A-B which covers rough topography difference, Nettleton method failed. While using the other two slices, Nettleton method yield with a different density value, 2700 kg/m"3 for A-C and 2300 kg/m"3 for A-D. A-C provides the lowest correlation value which represents the Upper Banten tuff and Gede Mt. volcanic rocks in accordance with Quartenary rocks exist in the studied area. (author)

  8. Environmental aspects of Greenfield NPP site in northern Finland

    International Nuclear Information System (INIS)

    Kopisto, L.

    2015-01-01

    Fennovoima will build a nuclear power plant of 1200 MW at Hanhikivi headland in Pyhaejoki, Northern Finland on the shore of the Baltic Sea. According to the target schedule the plant will produce electricity in 2024. The plant supplier is Rusatom Overseas, subsidiary of the Russian Rosatom. No industrial activity is practiced in the immediate surroundings of the site area and the headland and its surroundings are sparsely populated. The area is in its natural state. This means that all the preparatory and infrastructure works needs to be done before the construction of NPP can start. The environmental and nature conservation aspects have to be taken into consideration in planning, construction and operation of the NPP. Northern location sets some challenges to the design of the power plant. The sea area is normally covered with ice almost half of the year which has to be taken into account in the design of the power plant. But there are also advantages: in winter when the cooling water is cold the efficiency of electricity production is estimated to be exceptionally good, approximately 39 %. Since 2008, Fennovoima has carried out several environmental studies and surveys in the site area and has collected information about the nature conditions on land and in the sea area. The collected environmental data has been utilized in land use planning, environmental impact assessment procedure and in applying for conventional permits. The environmental data can also be used as baseline data. The document is composed of an abstract and the presentation slides

  9. Seismic hazard analysis of the NPP Kozloduy site

    International Nuclear Information System (INIS)

    Petrovski, D.; Stamatovska, S.; Arsovski, M.; Hadzievski, D.; Sokerova, D.; Solakov, D.; Vaptzarov, I.; Satchanski, S.

    1993-01-01

    The principal objective of this study is to define the seismic hazard for the NPP Kozloduy site. Seismic hazard is by rule defined by the probability distribution function of the peak value of the chosen ground motion parameter in a defined time interval. The overall study methodology consists of reviewing the existing geological, seismological and tectonic information to formulate this information into a mathematical model of seismic activity of the region and using this assess earthquake ground motion in terms of probability. Detailed regional and local seismological investigations have been performed. Regional investigations encompass the area within a radius of 320 km from the NPP Kozloduy site. The results of these investigations include all seismological parameters that are necessary for determination of the mathematical model of the seismicity of the region needed for the seismic hazard analysis. Regional geological and neotectonic investigations were also performed for the wider area including almost the whole territory of Bulgaria, a large part of Serbia, part of Macedonia and almost the whole south part of Romania

  10. The GMF (Group of European Municipalities with Nuclear Facilities) conference at Cernavoda. Opening talk

    International Nuclear Information System (INIS)

    Chirica, Teodor

    2006-01-01

    The conference 'Local Competence Building and Public Information in European Nuclear Territories', part of an European Commission project, took place at the Training Center of Cernavoda NPP, on 5-6 April, 2006. Organized by GMF with the support of the town hall and of the Cernavoda NPP, the manifestation gathered over 200 participants, among which representatives of the local public administration in Cernavoda, SN Nuclearelectrica SA, Ministry of Economy and Commerce, Nuclear Agency, CNCAN, ANDRAD, Local Communities and NGOs. The main topics of discussion was the collaboration relationship between local authorities and representatives of the plant regarding public safety and local development. The Mayor of Cernavoda, Gheorghe Hansa and the director of the NPP, Ionel Bucur, stressed that the location of the nuclear plant brings important contributions to the local budget, the socio-economical development of the area, ensuring jobs for most of the town's inhabitants. Speeches were given by Mr Gheorghe Hansa, Ms Blohm-Hieber, the director of the Transport and Energy Division from European Commission, and Mr Ionel Bucur who spoked about the relationship of the plant with the local community. Representatives from France, Slovenia, Sweden, Spain, Hungary and Romania shared their experience about 'The impact on the neighboring areas and the demands from the local authorities'. In his opening talk Mr Chirica Teodor, director general of SN Nuclearelectrica SA, showed that nuclear power in Romania has been based from its very inception on the Western safe technology, as reflected by the excellent safety an economical performances of Cernavoda NPP-Unit 1. Based on the long-term-commitment to nuclear power of the Romanian Government, the commercial operation of Cernavoda NPP Unit 2 is scheduled for the mid of 2007, and will supply 17-18% of the electricity production in Romania. The Romanian Government stressed his strong intention to complete Unit 3 and possibly Unit 4 at

  11. Standard protocol for evaluation of environmental transfer factors around NPP sites

    International Nuclear Information System (INIS)

    Hegde, A.G.; Verma, P.C.; Rao, D.D.

    2009-01-01

    This document presents the standard procedures for evaluation of site specific environmental transfer factors around NPP sites. The scope of this document is to provide standard protocol to be followed for evaluation of environmental transfer factors around NPP sites. The studies on transfer factors are being carried out at various NPP sites under DAE-BRNS projects for evaluation of site specific transfer factors for radionuclides released from power plants. This document contains a common methodology in terms of sampling, processing, measurements and analysis of elemental/radionuclides, while keeping the site specific requirements also in place. (author)

  12. Knowledge capture and preservation at Cernavoda Unit 2 Project

    International Nuclear Information System (INIS)

    Condu, M.; Chirica, T.; Popescu, D.; Marculescu, N.

    2007-01-01

    processes aimed to capture Unit 2 Project knowledge, including Feedback control by/from Cernavoda Unit 2 Project: owned by the Project Management Team, it is a process under the control of 'Discipline Manager' and 'Division General Manager'. It excludes any personal opinion type of feed-back. Main topic covered include: design technical, design process, procurement process, contract items and systems. Commissioning completion assurance (CCA) certificate: they are issued for a system or group of systems to provide assurance that each system has been adequately tested, its performance assessed to meet the design intent for a specified control point, and succeeding commissioning tests can proceed safely. Within this process specific attention is given to the problems discovered during commissioning and recommendations are provided for Units 3 and 4 in the commissioning report. The process is owned by the Commissioning Team within the project Management Team. C2 Experience: owned by the Owner and intended to focus on all important topics in a NPP construction and commissioning project. In the development of database structure the IAEA-TECDOC- 1390 was a valuable source of information. C2 Experience is a small project specifically designed with a focus on capturing tacit knowledge. It is addressed to all managers from a certain level upward and senior specialists within the Project, who were invited to participate and provide their opinion on things that could be improved or streamlined on a number of 18 topics, including contract, financing, design, procurement, QA/QS, site infrastructure and IT tools. It consists in inputs provided in a web-accessed database specifically designed to provide a friendly user interface and in exit interviews with selected specialists. Minimising the time needed to input an information was a special request considering that the final stage of a project keeps very busy those requested to share project experience and lessons learned. The process is

  13. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  14. Cernavoda NPP integration in the Romanian grid

    International Nuclear Information System (INIS)

    Prodan, R.C.

    2000-01-01

    The intention of this material is to present our point of view about some specific matters that arise from having a relatively large power production unit (706 MW) connected to a National Grid in which the second largest units are only 330 MW. The material consists in three major parts. In the first section is presented the 'big picture' of the Romanian National Grid. The second section covers the role played by CNPP in the grid power balance and frequency/voltage adjustment. CNPP is located at the base of the daily load curve and thus not normally participating at frequency adjustment. CNPP also has a contribution in increasing the dynamic stability of the National Grid. The third section is a more detailed presentation of CNPP behavior during grid upsets, with reference to the reactor and turbine control systems, and also the types of transients that our plant could induce to the grid due to internal malfunctions. The over-all unit control is based on the 'reactor power constant' policy, all the fluctuations in the power output to the grid being compensated by the Boiler Pressure Control System. Some features of the Turbine Electro-Hydraulic Control System and how it interacts with the Boiler Pressure Control Sys. will also be presented. The types of transients that CNPP could experience are reactor power setbacks (automatic ramped power reductions), reactor power step-backs (fast controlled power reduction) and unit trips, which are the most severe. There are two ways from the grid point of view to deal with such transients; to compensate the power loss by increasing the production and to disconnect unimportant power consumers. These actions are taken both automatically and manually (some details will be presented). (author)

  15. Cernavoda power simulator modernization - A step forward in Romanian low cost maintenance simulation technology

    International Nuclear Information System (INIS)

    Bucur, I.; Tatar, F.; Ionescu, Teodor

    2004-01-01

    At Cernavoda NPP the training is conducted on a Full Scope Simulator, a 1:1 replica of Cernavoda Unit 1 reference plant. For the improvement of training delivery the current task is to define the simulation facilities and structure capable to meet the increased requirements for training, qualification and licensing of nuclear personnel. Besides, this upgrade of simulation facilities should be considered if we are addressing the task of extension of training for Cernavoda Unit 2. In order to achieve this target, if we take into account the deployment of a new simulator, the costs would be extremely high. Many utilities carried out similar strategies, utilizing alternative simulators as a complement to full scope simulator in the areas of training and model maintenance. Therefore, depending upon training requirements and finances, the Cernavoda Unit 1 Simulator modernization providing also an alternative to full scope control room simulator may be a viable option. In this case, the solution that we discuss for Cernavoda training extension is the migration of Cernavoda Unit 1 Simulator to state-of-the-art. The paper has the following contents: - Considerations; - Benefits; - Required tasks; - Simulator Modernization Hardware; - Software Scope; - Executive System Programs; - Development and Debug Programs; - Modeling Software; - Plant System Models; - Graphical Model Builder; - Emulation Software; - Instructor Station Software; - Cernavoda 2 simulation facilities; - Limitations

  16. Design of NPP of new generation being constructed at the Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitsky, V.

    1999-01-01

    The design of a new generation NPP is described, underscoring advances in physical attributes and passive safety systems based on experiences with earlier designs at operating NPPs. This paper elaborates on systems for handling and storing radioactive wastes, on refinements in containment measures and on experimental and analytic validation of critical design factors. (author)

  17. BigFoot NPP Surfaces for North and South American Sites, 2000-2004

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: The BigFoot project gathered Net Primary Production (NPP) data for nine EOS Land Validation Sites located from Alaska to Brazil from 2000 to 2004. Each...

  18. NPP Temperate Forest: OTTER Project Sites, Oregon, USA, 1989-1991, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides net primary productivity (NPP) estimates and associated field measurements for six sites located along the 250-km, west-east transect of the...

  19. Remote technology in RBMK-1000 spent fuel management at NPP site

    International Nuclear Information System (INIS)

    Makarchuk, T.F.; Kozlov, Y.V.; Tikhonov, N.S.; Tokarenko, A.I.; Spichev, V.V.; Kaljazin, N.N.

    1999-01-01

    The report describes the remote technologies employed in the nuclear power plant with RBMK-1000 type. Spent fuel transfer and handling operations at reactor (AR) and away from reactor (AFR) on reactor site (RS) facilities are illustrated by the example of the Leningradskaya NPP and are typical for all NPPs with RBMK-1000. The current approach to spent fuel management at NPP sites is also presented. (author)

  20. Update on Cernavoda

    International Nuclear Information System (INIS)

    Boucher, R.

    1994-01-01

    The Cernavoda project in Romania is for five 700 MWe CANDU units. Construction began in 1980, but because of problems occurring, many of them associated with political, social, and economic changes in Romania, in 1991 the management of construction of Unit 1 was transferred from RENEL (Regia Nationala de Electricitate) to a consortium formed by AECL and Ansaldo. This had been one of the chief recommendations of a pr-operational safety review conducted by the I.A.E.A. By May 1994, Unit 1 was 93.4% complete, but progress was hampered by the need to rework a number of components, mainly piping. A continuous quality assurance program was in place. Ninety-two Romanian operators were trained by New Brunswick Power at Point Lepreau. As of the date of the conference, the target date for grid connection was March 1995, nine months ahead of the contractual target

  1. Update from Cernavoda

    International Nuclear Information System (INIS)

    Sommerville, J.D.

    1996-01-01

    On April 16 1995 Cernavoda Unit 1 achieved criticality. This event marked the culmination of roughly 17 years of effort and one of the most troubled histories experienced by any nuclear construction project worldwide. It was also a major milestone in the program begun by AAC (AECL-ANSALDO CONSORTIUM) in 1991 and due to end in June 1997 with the hand-over to RENEL (The Romanian National Electric Utility) of a fully operational CANDU 600 Power Plant. This paper briefly outlines the history of the project, the organisational structure in place and the funding schemes used to ensure its completion. Most attention is given to the present status of the project and those areas and/or issues which have been or continue to be significant problem areas. The future program for the achievement of 100% power and hand-over of the station to RENEL is outlined and potential future problem areas are discussed. (author). 9 appendices

  2. System for ecological monitoring and assessment for NPP site environment

    International Nuclear Information System (INIS)

    Vorob'ev, E.I.; Olejnikov, N.F.; Reznichenko, V.Yu.

    1987-01-01

    On the basis of the Leningrad NPP named after V.I. Lenin the development of a system for ecological monitoring and assessment (EMA) of the environment state and health of personnel and population has started in the EMA program framework. The program of ecological monitoring and assessment coordinates the works on the study of NPP effect on the nature and people, effect of separate factors and their combination, methods and models for the description of the effects, forecasting and evaluation, selection of the optimal protection strategies. Scientific foundations, structure and content of the EMA program are given to coordinate the works carried out according to the program with other works carried out in the country in this direction. The paper deals with the composition of monitoring parameters of the standard system of ecological monitoring of the environment for NPP

  3. Sitting Safety Aspects of Second Romanian NPP

    International Nuclear Information System (INIS)

    Mauna, T.

    2010-01-01

    The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units like the Wolsong applied design project for nuclear island. For the BOP parts the ASALDO-GE project was applied with the careful about the interface connection NSP requirements. The new NPP sitting studies began from 1982 in a serious manner as first part on Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. For develop the all package of the studies in concordance with the first IAEA Safety Standards recommendations. Till the 1982 the first mission of design and research multi-branch of specialists team was to adapt the NPP Cernavoda project having a open water cooling circuit to the new parameters of close water cooling circuit. But the team was looking at the other type of NPP for sitting. Also in the same time was studied the possibility of NSP foundation on hard less or soft soil foundation strata in connection with safety aspects. The close circuit of cooling water means others parameters of systems and need very large cooling towers. Also must be reconsidering the safety systems design and performance as new solution. In the south of Transylvania historical region in Romania the Olt River run from west to east having medium multi annual flow around 70 m3/s. The Olt River has a chain of small hydropower in operation and other planned. From geological and geophysical points of view two main faults, along the Olt river valley, one of this having seismically small activities was detected. Site region geotechnical studies show small quantity underground natural gas, salt and peat. The initial nuclear program has imposed 4 NPP units site near Olt River. Taking into account the orogenesis, water cooling needs and other local feature can't be built more than two NPP units on a site. This paper tries to reconsider the old analysis from the last IAEA Safety Standards point of view taking into account the new

  4. Results on improved environmental monitoring at the Ignalina NPP site

    International Nuclear Information System (INIS)

    Gudelis, A.; Remeikis, V.; Gubachev, I.; Batalin, J.

    2002-01-01

    Within the IAEA TC Project 'Radioecology in the vicinity of the Ignalina NPP' (LIT/9/003) a high efficiency HPGe well-type detector was obtained in 1998 for the investigations in environmental radioactivity in Lithuania. Efficiency calibration for this detector was done in the energy range 122-1461 keV by using reference standard solution with single-photon emitting radionuclides. At the same time, the coincidence-summing correction factor was experimentally determined for 60 Co. Earlier investigations carried out in moss samples in 1996 have shown that the site-specific radionuclide 60 Co was distributed on the ground mainly in the area of radius of 5-7 km from the source, and the maximum activity concentration on the earth surface was found to be 22 Bq/m 2 . However, only natural 7 Be and globally distributed 137 Cs were permanently measured in aerosol filter samples taken at 7 Ignalina NPP (INPP) monitoring stations, before the introduction of efficient HPGe well-type detector. Normally, the aerosol filters have been pressed into tablets and counted on the end cap of the Ge(Li)-detector that had relatively high MDA value (of the order of 0.5 Bq per sample for 137 Cs). It was, therefore, expected that the use of 4π geometry attainable inside a well would considerably improve the detection probability for 60 Co and other artificial radionuclides of the INPP origin. In order to prepare the aerosol filter samples for counting in new geometry they had to be ashed at 450 deg C. The final volume of ash samples was close to 2 cm 3 , and this amount could be easily fit into well that could accommodate samples of up to 4 cm 3 . For this geometry, the MDA values for 60 Co and 137 Cs were determined as 20 mBq and 12 mBq, respectively, when counting time was set to 100,000 s. After the remeasuring the aerosol filter samples in high-efficiency geometry a number of samples revealed the content of activation products 54 Mn and 60 Co that were not detected when Ge

  5. Seismic site evaluation practice and seismic design guide for NPP in Continent of China

    Energy Technology Data Exchange (ETDEWEB)

    Yuxian, Hu [State Seismological Bureau, Beijing, BJ (China). Inst. of Geophysics

    1997-03-01

    Energy resources, seismicity, NPP and related regulations of the Continent of China are briefly introduced in the beginning and two codes related to the seismic design of NPP, one on siting and another on design, are discussed in some detail. The one on siting is an official code of the State Seismological Bureau, which specifies the seismic safety evaluation requirements of various kinds of structures, from the most critic and important structures such as NPP to ordinary buildings, and including also engineering works in big cities. The one on seismic design of NPP is a draft subjected to publication now, which will be an official national code. The first one is somewhat unique but the second one is quite similar to those in the world. (author)

  6. Seismic site evaluation practice and seismic design guide for NPP in Continent of China

    International Nuclear Information System (INIS)

    Hu Yuxian

    1997-01-01

    Energy resources, seismicity, NPP and related regulations of the Continent of China are briefly introduced in the beginning and two codes related to the seismic design of NPP, one on siting and another on design, are discussed in some detail. The one on siting is an official code of the State Seismological Bureau, which specifies the seismic safety evaluation requirements of various kinds of structures, from the most critic and important structures such as NPP to ordinary buildings, and including also engineering works in big cities. The one on seismic design of NPP is a draft subjected to publication now, which will be an official national code. The first one is somewhat unique but the second one is quite similar to those in the world. (author)

  7. Preliminary site investigation for LL and IL radwaste disposal for Qinshan NPP

    International Nuclear Information System (INIS)

    Huang Yawen; Chen Zhangru

    1993-01-01

    With the purpose of selecting a disposal site for the low- and intermediate-level radwastes arising from Qinshan NPP, site investigations were carried out in several districts of Zhejiang Province. Investigation objectives included the circumstances of geology, hydrogeology, environmental ecology, and social economy. On the basis of collected data, five possible sites were recommended for policy-making reference and further investigation

  8. Construction of Site Risk Model using Individual Unit Risk Model in a NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Ho Gon; Han, Sang Hoon [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Since Fukushima accident, strong needs to estimate site risk has been increased to identify the possibility of re-occurrence of such a tremendous disaster and prevent such a disaster. Especially, in a site which has large fleet of nuclear power plants, reliable site risk assessment is very emergent to confirm the safety. In Korea, there are several nuclear power plant site which have more than 6 NPPs. In general, risk model of a NPP in terms of PSA is very complicated and furthermore, it is expected that the site risk model is more complex than that. In this paper, the method for constructing site risk model is proposed by using individual unit risk model. Procedure for the development of site damage (risk) model was proposed in the present paper. Since the site damage model is complicated in the sense of the scale of the system and dependency of the components of the system, conventional method may not be applicable in many side of the problem.

  9. Development of Tsunami PSA method for Korean NPP site

    International Nuclear Information System (INIS)

    Kim, Min Kyu; Choi, In Kil; Park, Jin Hee

    2010-01-01

    A methodology of tsunami PSA was developed in this study. A tsunami PSA consists of tsunami hazard analysis, tsunami fragility analysis and system analysis. In the case of tsunami hazard analysis, evaluation of tsunami return period is major task. For the evaluation of tsunami return period, numerical analysis and empirical method can be applied. The application of this method was applied to a nuclear power plant, Ulchin 56 NPP, which is located in the east coast of Korean peninsula. Through this study, whole tsunami PSA working procedure was established and example calculation was performed for one of real nuclear power plant in Korea

  10. An Extreme Meteorological Events Analysis For Nuclear Power Plant (NPP) Siting Project at Bangka Island, Indonesia

    Science.gov (United States)

    Septiadi, Deni; S, Yarianto Sugeng B.; Sriyana; Anzhar, Kurnia; Suntoko, Hadi

    2018-03-01

    The potential sources of meteorological phenomena in Nuclear Power Plant (NPP) area of interest are identified and the extreme values of the possible resulting hazards associated which such phenomena are evaluated to derive the appropriate design bases for the NPP. The appropriate design bases shall be determined according to the Nuclear Energy Regulatory Agency (Bapeten) applicable regulations, which presently do not indicate quantitative criteria for purposes of determining the design bases for meteorological hazards. These meteorological investigations are also carried out to evaluate the regional and site specific meteorological parameters which affect the transport and dispersion of radioactive effluents on the environment of the region around the NPP site. The meteorological hazards are to be monitored and assessed periodically over the lifetime of the plant to ensure that consistency with the design assumptions is maintained throughout the full lifetime of the facility.

  11. Determination of potential NPP site with GIS in the coastal Provinces West Kalimantan

    International Nuclear Information System (INIS)

    Heni Susiati

    2014-01-01

    The IAEA has published the IAEA Safety Guide NS-R-3 and BAPETEN has issued the Chairman Decree (Perka BAPETEN No. 5, 2007) on site evaluation for NPP to ensure safe and secure operation of NPP’s that will be built. In relation with a preparatory program of NPP in Kalimantan Barat, BATAN conducted site survey along the coastal area of Ketapang and Kayong Utara, Kalimantan Barat. This study is aimed to get potential sites along the coastal area of Ketapang and Kayong Utara based on weighting of criteria and spatial modeling and GIS. Determination of potential site is done based on following criteria: slope, lithology, geology, topography, rainfall, hazard vulnerability, proximity to water bodies, distance of residential areas, land use, peat existence, hydrogeology, etc. Based on weighting and scoring, the study identified 4 potential sites on the coastal area of Kendawangan, Sukadana, Matan Hilir Utara and Matan Hilir Selatan. (author)

  12. Cernavoda CANDU severe accident evaluation

    International Nuclear Information System (INIS)

    Negut, G.; Marin, A.

    1997-01-01

    The papers present the activities dedicated to Romania Cernavoda Nuclear Power Plant first CANDU Unit severe accident evaluation. This activity is part of more general PSA assessment activities. CANDU specific safety features are calandria moderator and calandria vault water capabilities to remove the residual heat in the case of severe accidents, when the conventional heat sinks are no more available. Severe accidents evaluation, that is a deterministic thermal hydraulic analysis, assesses the accidents progression and gives the milestones when important events take place. This kind of assessment is important to evaluate to recovery time for the reactor operators that can lead to the accident mitigation. The Cernavoda CANDU unit is modeled for the of all heat sinks accident and results compared with the AECL CANDU 600 assessment. (orig.)

  13. Hydrology and Oceanography Analysis Regarding The NPP Site Screening Process at Banten Province

    International Nuclear Information System (INIS)

    Yarianto-S-Budi-Susilo

    2007-01-01

    Regarding the NPP development in the future, it is needed to make inventory of potential site in the Java Island as well as in the outside Java Island. The NPP site inventory availability is to answer the energy demand challenge. Site screening process should be performed in accordance with the IAEA safety standard regarding the site selection, investigating several aspects related to the NPP safety (exclusion, safety and suitability factor) in the large area to obtain potential site candidates. For the site survey stage of hydrology and oceanography aspects, the analysis are more focused on the tidal phenomena along the north coastline, bathymetry, water resource, and hydrology system in the Banten Province. The method used are secondary data collection, field confirmation and internet searching. The result of the study showed that Tanjung Pujut and Tanjung Pasir are suitable based on the bathymetry and water intake facility consideration. Meanwhile Tanjung Kait and Tanjung Pasir more suitable considering tsunami aspects that may be generated by Krakatau Volcano. (author)

  14. Design of NPP of new generation being constructed at Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitskij, V.

    2000-01-01

    The design of a new-generation nuclear power plant with advanced WWER-1000 units, currently under construction at Novovoronezh, is dealt with in considerable detail. Information is given on the general layout of the power plant, and the monoblock comprising the four-loop reactor plant with double containment, the turbine hall with two turbine-driven feedwater pumps and safety and auxiliary systems is described. In a separate building at the power plant site, a new fuel storage facility is located designed for extreme external effects. The operations involved in fuel handling, in both the storage facility and the reactor department, are mentioned. The management of various types of radioactive waste is highlighted. The basic principles of the engineering solutions pertaining to the plant's electrical part are outlined. The concept of the instrumentation and control system is explained. Information is also given on the double containment system. A considerable part of the presentation is devoted to the philosophy and concept of the power plant safety, to the results of safety evaluation and to the research carried out in this respect. The paper is concluded with a discussion of the experiments and analyses performed with the aim to justify the design solutions as regards the passive heat removal system. (A.K.)

  15. Identification of flora and fauna biodiversity at Berau, East Kalimantan in NPP pre site survey

    International Nuclear Information System (INIS)

    June Mellawati; Fepriadi; Yarianto; Tajudin Laddade

    2010-01-01

    In pre survey activity of NPP site candidate, environmental aspect is a part of non safety aspect, but the existence as an important area is needed to consider. Pre survey activity of NPP site at Berau East Kalimantan is done for follow up result of agreement of Governor in Kalimantan. Purpose of study is to identify fauna and flora biodiversity in Berau Kalalimantn Timur to complete the data base of environmental aspect at survey activity of NPP site candidate The method used is to conduct an inventory and identification of flora-fauna through secondary data collection, making zoning area based on the type of endangered species, and analyze and evaluate the suitability. The survey location priority the coast area such as Sambaliung District, Derawan, Maratua, Tabalar, Biatan-Lempake, Talisayan, Batu Putih and Biduk-Biduk District, Berau Regency, East Kalimantan Province. Activity is done at June 2008 - June 2009. The results showed that there were various species of flora and fauna that are categorized protected under Law Decree no. 5 of 1990 in the study location. However, some areas such as Tanjung Pandan, Tanjung Bohe northern, southern of Tanjung Ulingan, District Derawan Island, and Batu Putih Talisayan District, and Teluk Sulaiman, Biduk-Biduk District need further study and consideration for zoning interest in nuclear power plants because they meet the existing criteria. (author)

  16. Analyses of thermal plume of Cernavoda nuclear power plant by satellite remote sensing data

    Science.gov (United States)

    Zoran, M. A.; Nicolae, D. N.; Talianu, C. L.; Ciobanu, M.; Ciuciu, J. G.

    2005-10-01

    The synergistic use of multi-temporal and multi-spectral remote sensing data offers the possibility of monitoring of environment quality in the vicinity of nuclear power plants (NPP). Advanced digital processing techniques applied to several LANDSAT, MODIS and ASTER data are used to assess the extent and magnitude of radiation and non-radiation effects on the water, near field soil, vegetation and air for NPP Cernavoda , Romania . Cernavoda Unit 1 power plant, using CANDU technology, having 706.5 MW power, is successfully in operation since 1996. Cernavoda Unit 2 which is currently under construction will be operational in 2007. Thermal discharge from nuclear reactor cooling is dissipated as waste heat in Danube-Black -Sea Canal and Danube river. Water temperature distributions captured in thermal IR imagery are correlated with meteorological parameters. Additional information regarding flooding events and earthquake risks is considered . During the winter, the thermal plume is localized to an area within a few km of the power plant, and the temperature difference between the plume and non-plume areas is about 1.5 oC. During the summer and fall, there is a larger thermal plume extending 5-6 km far along Danube Black Sea Canal, and the temperature change is about 1.0 oC. Variation of surface water temperature in the thermal plume is analyzed. The strong seasonal difference in the thermal plume is related to vertical mixing of the water column in winter and to stratification in summer. Hydrodynamic simulation leads to better understanding of the mechanisms by which waste heat from NPP Cernavoda is dissipated in the environment.

  17. Hydrodynamic models of the possibility of flooding Zaporizhya NPP site beyond the extreme earthquakes and hurricanes

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Gablaya, T.V.; Vashchenko, V.N.; Gerasimenko, T.V.; Kozlov, I.L.

    2014-01-01

    We propose a hydrodynamic model of possible flooding of the industrial site at Zaporozh'e NPP design basis earthquakes and hurricane. In contrast to the quasi-stationary approach of stress tests in the proposed model takes into account the dynamic nature of the processes of flooding, as well as a direct impact of external influences on extreme Kakhovske reservoir. As a result of hydrodynamic modeling, the possible conditions and criteria for the flooding of the industrial site at Zaporozhe extreme external influences

  18. Chernobyl NPP: Completion of LRW Treatment Plant and LRW Management on Site - 12568

    Energy Technology Data Exchange (ETDEWEB)

    Fedorov, Denis; Adamovich, Dmitry [SIA ' RADON' , Moscow (Russian Federation); Klimenko, I.; Taranenko, L. [IVL Engineering, Kiev (Ukraine)

    2012-07-01

    Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m3 of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010 SIA RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. Currently, the LRTP is getting ready to perform the following activities: 1. retrieval of waste from tanks stored at ChNPP LWS using waste retrieval system with existing equipment involved; 2. transfer of retrieved waste into LRTP reception tanks with partial use of existing transfer pipelines; 3. laboratory chemical and radiochemical analysis of reception tanks contest to define the full spectrum of characteristics before processing, to acknowledge the necessity of preliminary processing and to select end product recipe; 4. preliminary processing of the waste to meet the requirements for further stages of the process; 5. shrinkage (concentrating) of preliminary processed waste; 6. solidification of preliminary processed waste with concrete to make a solid-state (end product) and load of concrete compound into 200-l drums; 7. curing of end product drums in LRTP curing hall; 8. radiologic monitoring of end product drums and their loading into special overpacks; 9. overpack radiological monitoring; 10. send for disposal (ICSRM Lot 3); The current technical decisions allow to control and return to ChNPP of process media and supporting systems outputs until they satisfy the following quality norms: salt content: < 100 g/l; pH: 1 - 11; anionic surface-active agent: < 25 mg/l; oil

  19. Cernavoda unit2 recirculated cooling water system transient analysis

    International Nuclear Information System (INIS)

    Nita, I. P.; Pancef, R.

    2015-01-01

    The paper is an approach to calculate the response of Cernavoda NPP Unit 2 RCW System to transient regimes during normal and abnormal regimes. Then one started to analyse the system response to reactor trip on class III and IV of power, LOCA on class IV of power, LOCA on class III power, LOIA on class IV of power, and LOIA on class III power. Moreover, one analysed the system transient due to requirement of changeover of a RCW operating pump, planned and unplanned changeover. This is the first transient approach to this system that took in consideration all building of the system, obtaining a very large system model, with over 900 pipe, 4 pumps, 50 consumers, 21 control valves. The changeover procedure was required to be analysed in order to change the nominal operating mode for Unit 2, from current 2 pumps in operation to 3 pump operations during summer operating mode. (authors)

  20. Radioactive dispersion analysis for hypothetical nuclear power plant (NPP) candidate site in Perak state, Malaysia

    Science.gov (United States)

    Shamsuddin, Shazmeen Daniar; Basri, Nor Afifah; Omar, Nurlyana; Koh, Meng-Hock; Ramli, Ahmad Termizi; Saridan Wan Hassan, Wan Muhamad

    2017-10-01

    Malaysia is planning to build a nuclear power plant (NPP) by 2030 to diversify the national electricity supply and resources. Selection of an NPP site must consider various factors, especially nuclear safety consideration to fulfil the nuclear safety objectives. Environmental Risk Assessment Analysis is a part of safety requirements by the International Atomic Energy Agency (IAEA) prior to the NPP commissioning process. Risk Assessments Analysis (RIA) is compulsory for the NPP site evaluation. One of RIA methods are Radioactive Dispersion Analysis using probabilistic risk analysis software. It is also important to perform studies to estimate the impact to the neighbouring population in the case of a nuclear accident at the power plant. In the present work, aimed to study the impact of a hypothetical nuclear accident by simulating the dispersion pattern of radionuclides originated from a candidate site at Manjung, Perak. The work has been performed using the HotSpot Health Physics codes. Two types of radionuclides have been considered namely 137Cs and 131I. In calculations, the initial concentration of radioactive materials of Fukushima Daiichi accident data are used which are 2.06 x 1016 Bq and 1.68 x 1017 Bq respectively for the two radionuclides. The result shows that the dispersion distance obtained from both software are not the same. It shows that 137Cs and 131I can be dispersed as far as 16 km and 80 km away from the site during radiological accident respectively, reaching major towns in Perak. Using HOTSPOT, the estimated total effective dose equivalent (TEDE) for 137Cs and 131I at major towns in Perak such as Lumut and Sitiawan are 1.2 mSv and 9.9 mSv. As for Taiping, Ipoh, Kampar, and Teluk Intan the estimated TEDE is around 0.2 mSv and 1.6 mSv respectively. In conclusion, the dispersion can reach as far as 80 km from the site. However, estimated annual effective dose is not more than 1 mSv limit, which is considered acceptable in the point of view of

  1. Radioactive dispersion analysis for hypothetical nuclear power plant (NPP candidate site in Perak state, Malaysia

    Directory of Open Access Journals (Sweden)

    Shamsuddin Shazmeen Daniar

    2017-01-01

    Full Text Available Malaysia is planning to build a nuclear power plant (NPP by 2030 to diversify the national electricity supply and resources. Selection of an NPP site must consider various factors, especially nuclear safety consideration to fulfil the nuclear safety objectives. Environmental Risk Assessment Analysis is a part of safety requirements by the International Atomic Energy Agency (IAEA prior to the NPP commissioning process. Risk Assessments Analysis (RIA is compulsory for the NPP site evaluation. One of RIA methods are Radioactive Dispersion Analysis using probabilistic risk analysis software. It is also important to perform studies to estimate the impact to the neighbouring population in the case of a nuclear accident at the power plant. In the present work, aimed to study the impact of a hypothetical nuclear accident by simulating the dispersion pattern of radionuclides originated from a candidate site at Manjung, Perak. The work has been performed using the HotSpot Health Physics codes. Two types of radionuclides have been considered namely 137Cs and 131I. In calculations, the initial concentration of radioactive materials of Fukushima Daiichi accident data are used which are 2.06 x 1016 Bq and 1.68 x 1017 Bq respectively for the two radionuclides. The result shows that the dispersion distance obtained from both software are not the same. It shows that 137Cs and 131I can be dispersed as far as 16 km and 80 km away from the site during radiological accident respectively, reaching major towns in Perak. Using HOTSPOT, the estimated total effective dose equivalent (TEDE for 137Cs and 131I at major towns in Perak such as Lumut and Sitiawan are 1.2 mSv and 9.9 mSv. As for Taiping, Ipoh, Kampar, and Teluk Intan the estimated TEDE is around 0.2 mSv and 1.6 mSv respectively. In conclusion, the dispersion can reach as far as 80 km from the site. However, estimated annual effective dose is not more than 1 mSv limit, which is considered acceptable in the point

  2. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    Energy Technology Data Exchange (ETDEWEB)

    Kassim, Moath [Kyunghe Univ., Yongin (Korea, Republic of); Kessel, David S. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-05-15

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value.

  3. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    International Nuclear Information System (INIS)

    Kassim, Moath; Kessel, David S.

    2015-01-01

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value

  4. Systematic evaluation of the Cernavoda nuclear power plant physical protection system

    International Nuclear Information System (INIS)

    Ionescu, D.S.

    2002-01-01

    Full text: For three years at Cernavoda NPP is working a process to systematic evaluating the effectiveness of the Physical Protection System (PPS). Due to the fact that this evaluation has to be continuous, the first important step is to define a baseline to compare periodically the performance of PPS against it. The necessity of that process has been identified as follows: the continuous changes in the field of perceived threats against Cernavoda NPP and the necessary measures to respond to that changing climate; the needful to improve the performance of PPS against certain threats in conjunction with the needful to allocate substantially financial and human resources to cover the discovered weakness in the system; an assistant to take the appropriate measure in case of indisponibility of one or more components or parts of the PPS. The second step is the continuous tracking of the behavior of PPS in order to determine: the maintenance resource allocation and the priorities of the work; the predictive behavior of installed components to determine the future appropriate measures, including budget dimensioning. SAVI is a PC compatible program developed by SANDIA Laboratory (USA) for comprehensive analysis of PPS effectiveness. That program is organized in two modules: the Adversary Sequence Diagram (ASD) module and the outsider module modeling trough specific codes both the characteristics of PPS and of the predicted adversary. Combining the two modules related to a specific PPS and adversary is possible to find out the effectiveness of the physical protection system for each vital zone along to ten possible paths to penetrate by adversary, starting with the most vulnerable one. Because of two conservative assumption considered by the SAVI algorithm (adversary know the PPS characteristics and they use an optimal penetration strategy), the measure of effectiveness (probability of interruption - P I ) is very realistic and conservative related to the necessary

  5. Database system of geological information for geological evaluation base of NPP sites(I)

    International Nuclear Information System (INIS)

    Lim, C. B.; Choi, K. R.; Sim, T. M.; No, M. H.; Lee, H. W.; Kim, T. K.; Lim, Y. S.; Hwang, S. K.

    2002-01-01

    This study aims to provide database system for site suitability analyses of geological information and a processing program for domestic NPP site evaluation. This database system program includes MapObject provided by ESRI and Spread 3.5 OCX, and is coded with Visual Basic language. Major functions of the systematic database program includes vector and raster farmat topographic maps, database design and application, geological symbol plot, the database search for the plotted geological symbol, and so on. The program can also be applied in analyzing not only for lineament trends but also for statistic treatment from geologically site and laboratory information and sources in digital form and algorithm, which is usually used internationally

  6. Radionuclide Distribution in the Soil on the Stabatishkes Site in the Vicinity of the Ignalina NPP

    Directory of Open Access Journals (Sweden)

    Jevgenij Aliončik

    2011-02-01

    Full Text Available A near surface repository for low and intermediate-level short-lived radioactive waste will be built on the Stabatiškės site in the vicinity of Ignalina NPP during decommissioning works. The reservoir can also be used for the waste stored in the temporary repositories of the Ignalina NPP. Engineering and nature protective barriers are used in the repository for radioactive waste, however, radionuclides can spread into the environment, extend in the biosphere and cause (define the external power light exposure of the environment due to the natural and premature (prescheduled degradation of the engineering barriers of the repository. The properties of the soil (acidity, quantity of organic substances, humidity are being investigated for estimating the possible migration and dispersion of radionuclides. The activity of radionuclides in the soil is also estimated before building the repository. Natural and artificial radionuclides make the pollution of the soil, and therefore the accumulation and vertical migration of artificial (137Cs, 60Co and natural (226Ra, 232Th, 40K radionuclides are being researched in the soil on the Stabatiškės site.Article in Lithuanian

  7. NPP Boreal Forest: Consistent Worldwide Site Estimates, 1965-1995, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides estimates of above- and below-ground biomass, above- and below-ground NPP (ANPP and BNPP), and total NPP(TNPP) for selected North American and...

  8. Seismic assessment of a site using the time series method

    International Nuclear Information System (INIS)

    Krutzik, N.J.; Rotaru, I.; Bobei, M.; Mingiuc, C.; Serban, V.; Androne, M.

    1997-01-01

    To increase the safety of a NPP located on a seismic site, the seismic acceleration level to which the NPP should be qualified must be as representative as possible for that site, with a conservative degree of safety but not too exaggerated. The consideration of the seismic events affecting the site as independent events and the use of statistic methods to define some safety levels with very low annual occurrence probability (10 -4 ) may lead to some exaggerations of the seismic safety level. The use of some very high value for the seismic acceleration imposed by the seismic safety levels required by the hazard analysis may lead to very costly technical solutions that can make the plant operation more difficult and increase maintenance costs. The considerations of seismic events as a time series with dependence among the events produced, may lead to a more representative assessment of a NPP site seismic activity and consequently to a prognosis on the seismic level values to which the NPP would be ensured throughout its life-span. That prognosis should consider the actual seismic activity (including small earthquakes in real time) of the focuses that affect the plant site. The paper proposes the applications of Autoregressive Time Series to issue a prognosis on the seismic activity of a focus and presents the analysis on Vrancea focus that affects NPP Cernavoda site, by this method. The paper also presents the manner to analyse the focus activity as per the new approach and it assesses the maximum seismic acceleration that may affect NPP Cernavoda throughout its life-span (∼ 30 years). Development and applications of new mathematical analysis method, both for long - and short - time intervals, may lead to important contributions in the process of foretelling the seismic events in the future. (authors)

  9. Site ultrasonic measurement on RPV stud-bolt loading under hot transient of Qinshan NPP

    International Nuclear Information System (INIS)

    Qu Jiadi; Dou Yikang; Zhu Shiming

    1994-08-01

    It expounds that the key of solving thermal transient sealing problem is to obtain the thermal increment of stud-bolt loading. This loading, as a primary stress loading, is directly related to the bolt fatigue life and transient loading spectrum for vessel analysis. The fundamental works and main results of ultrasonic measurement on RPV stud-bolt loading on Qinshan site are also presented. The measuring capability has exceeded 1 m in length and temperature of 280 degree C, therefore, it is possible to be used in the field of NPP. The paper is the continuation of research work for sealing analysis and tests on the RPV (see SMiRT-9, 10)

  10. Spatial distribution of uranium in groundwater around proposed NPP site at Kovvada Andhra Pradesh

    International Nuclear Information System (INIS)

    Sahoo, S.K.; Lenka, P.; Patra, A.C.; Tripathi, R.M.; Rama Rao, D.; Yungndhar, M.; Vinod Kumar, A.

    2018-01-01

    Uranium is the basic nuclear fuel of the present nuclear power programme. To meet the demand of electrical energy, it is proposed for establishment of two atomic power stations (2 x 1000 MW LWR) at Kovvada, Ranasthalam mandal of Srikakulam district of Andhra Pradesh. It is mandatory to generate the prevailing baseline levels of natural and manmade radionuclides along with conventional water and air quality parameters of the site. Under the baseline study, a comprehensive groundwater quality of the site is taken to establish the radionuclide levels in ground water samples of the coastal site. Natural radiation and radioactivity is a present in all the ecosystems naturally. Uranium is a naturally occurring low specific activity radionuclide present in the rock since the inception of the earth. Groundwater interact with the host rocks and the wet weathering process facilitate the solubility of uranium in groundwater. The physiochemical characteristics of the host rock and groundwater influence the leachability of uranium from rock to water and the contact time, temperature, salinity are also few influencing parameters. In the present study, an attempt has been made to study the spatial distribution of uranium in groundwater around the proposed NPP site at Kovvada, Andhra Pradesh

  11. Managing delayed projects. Cernavoda NPP - Romania. Importance of NGO involvement

    International Nuclear Information System (INIS)

    Rotaru, I.

    2003-01-01

    In Romania there is a diversity of civil societies with respect to the attitude towards nuclear power. Among the dedicated societies supporting nuclear power development there are: the Romanian Atomic Forum (Ratomet), affiliated to the European Atomic Forum; the Romanian Nuclear Power Association (Arden), affiliated to the European Nuclear Society; the Romanian Radioprotection Society (SR Rp), affiliated to the Radiation Protection Association. The main dedicated activities of above mentioned Non-governmental Organizations (Ng) are: establishing contacts and organizing meeting with Romanian political decision making factors, mass media representatives, institutional entities, civil society ect.; orienting and co-coordinating activities of Romanian companies involved in production and services for nuclear energy; serving as contact point for relevant international communication and business relation; creating internal working groups for certain theme or sub-domain and suggested solution for a particular issue, including experts even from outside of the association; performing lobby activities ect

  12. ALARA tools and performance indicators at Cernavoda NPP

    International Nuclear Information System (INIS)

    Chitu, C.; Popescu, V.; Simionov, V.

    2009-01-01

    Work efficiency is an area of high concern to nuclear power plant operators. Job planning has to be done so that there will be enough time for ALARA actions to be implemented. The control of the activities involving radiological risk is part of ALARA Process. An effective control supposes the implementation of a process to systematically identify the activities performed in radiological areas. Plant Performance Indicators related to ionizing radiation exposure have been established to improve station safe performance. They are assessed and reported periodically to reflect the safe operation objectives. If target values are exceeded 'abnormal condition reports' are generated. Corrective and preventive actions aim at work planning, technical aspects, and human performance. All the staff is informed about these events and corrective actions described through the training program are implemented. (authors)

  13. ALARA and radiation protection optimization status of Cernavoda NPP

    International Nuclear Information System (INIS)

    Hau, D.I.

    2001-01-01

    ALARA (As Low As Reasonably Achievable) in Radiation Protection is specifically applied as a tool in lowering the risk of exposure when performing necessary activities, leading to a reduction of individual and collective doses of workers as much and as reasonable possible. (authors)

  14. Digital control computer upgrade at the Cernavoda NPP simulator

    International Nuclear Information System (INIS)

    Ionescu, T.

    2006-01-01

    The Plant Process Computer equips some Nuclear Power Plants, like CANDU-600, with Centralized Control performed by an assembly of two computers known as Digital Control Computers (DCC) and working in parallel for safely driving of the plan at steady state and during normal maneuvers but also during abnormal transients when the plant is automatically steered to a safe state. The Centralized Control means both hardware and software with obligatory presence in the frame of the Full Scope Simulator and subject to changing its configuration with specific requirements during the plant and simulator life and covered by this subsection

  15. Cernavoda NPP - A competitive energy source for sustainable development

    International Nuclear Information System (INIS)

    Rotaru, Ioan; Bilegan, I.C.; Jelev, Adrian

    2004-01-01

    At present a trend manifests world wide toward promoting nuclear power, for increasing its performances, toward maintaining competitiveness and sustaining the programs of development and application of advanced nuclear technologies. These objectives will be achieved by improving: operation performances; management of life-cycle, quality management; technical infrastructure; human resource performances; international cooperation for developing innovative nuclear technologies; technologies and applications of advanced reactors. Fostering the Romanian nuclear power on the basis of CANDU 6 type rectors, the developing in Romania of an advanced industrial infrastructure, the economical, environmental and social aspects and their interplay with nuclear power development are the main subjects presented in this work

  16. Cernavoda NPP - Boiler and steam cycle chemistry control

    International Nuclear Information System (INIS)

    Zotica, D.

    2001-01-01

    Steam generators protection against corrosion and fouling is an ongoing issue for nuclear power plants. The true effectiveness of the secondary chemistry control program is best judged by the absence of secondary side corrosion related tube degradation particularly that leads to tube plugging or sleeving or tube support degradation. To continue striving for excellence in chemical control, the following issues should be considered: Continuous evaluation of the effectiveness of the chemistry control program in mitigating SG damage; Evaluation of plant compliance with the program; Laboratory quality assurance program to assure that laboratory analyses are accurate and reproductibile; Quality assurance program for on-line monitoring equipment to assure that results from this equipment are accurate. (R.P.)

  17. Geological evaluation of spent fuel storage and low-intermediate level radwaste disposal in the site of NPP candidate

    International Nuclear Information System (INIS)

    Sucipta; Yatim, S.; Martono, H.; Pudyo, A.

    1997-01-01

    Based on the consideration of techno-economy and environmental safety, the radioactive waste treatment installation (RWI), interim storage of spen fuel (ISSF) and low-intermediate level disposal shall be sited in the surrounding of NPP area. The land suitability of NPP's site candidate at Muria Peninsula as spent fuel storage and low-intermediate level radwaste disposal need to be studied. Site selection was conducted by overlay method and scoring method, and based on safety criteria which include geological and environmental aspects. Land evaluation by overlay method has given result a potential site which have highest suitable land at surrounding of borehole L-15 about 17.5 hectares. Land evaluation by scoring method has given result two land suitability classes, i.e. moderate suitability class (includes 14 borehole) and high suitability class, include borehole L-2, L-14 and L-15 (author)

  18. NPP Siting in Western Part of Java Island Indonesia: Regional Analysis Stage

    International Nuclear Information System (INIS)

    Sastratenaya, A.S.; Yuliastuti

    2011-01-01

    Full text of publication follows: Considering that Banten and West Java Provinces are dense regions of industry, therefore they require a large amount of electricity. Nuclear power plant is one option to be considered to anticipate the future electricity demand. To support the program, it is needed to look for some potential locations through NPP siting. The siting should meet the requirement of safety, safety aspects of the natural external events, human induced external events, public and environmental safety. Site selection is performed in several stages, where each stage has specific assessment criteria. Siting is commenced with pre-survey activity to obtain several interest areas, the activity covers a wide area but the used data is very limited and only apply general criteria. The following activities after pre survey are site survey consisting of (1) regional analysis, (2) site screening, and (3) comparison and ranking stages. The objective of regional analysis is to obtain potential sites in the study area of 150 km radius from each interest area by using both general and specific criteria. The potential sites then screened to obtain selected candidate sites by using more detailed secondary data as well as survey activities such as geophysical investigation, a few of drilling, etc., within the radius of 50 km from each potential site. All the selected candidate sites are then compared and ranked to obtain preferred candidate site. Site evaluation is the next step to evaluate all site-specific parameter to obtain design basis parameters and as the basis for preparing site permit document. This paper presents the methodology and result of regional analysis stage. The objective of the activity is to obtain potential sites in the north coast of West Java and Banten Provinces by considering fourteen study aspects which could be categorize into safety related aspects, non-safety related aspect and public education. However, this paper only considers the safety

  19. Foreign Material Exclusion Program at CNE Cernavoda Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Urjan, Daniel [S.N. ' Nuclearelectrica' SA, CNE Cernavoda Nuclear Power Plant, Medgidiei 2 Street, 905200 Cernavoda, Constanta (Romania)

    2008-07-01

    In the face of a continuing attention to operations and maintenance costs at nuclear power plants, the future of the industry depends largely upon increasing plant availability and improving operating efficiency. The success in achieving these objectives is dependent upon the success of each plant's equipment maintenance program. Preventing the introduction of foreign materials into a nuclear power plant system or component requires a careful, thoughtful, and professional approach by all site personnel. This paper describes a proactive approach to prevent the introduction of foreign material into systems and components, by providing an overview of technical considerations required to develop, implement, and manage a foreign material exclusion program at CNE Cernavoda Unit 1 and 2 Nuclear Power Station. It is also described an example of Foreign Material Intrusion which happened during the 2003 planned maintenance outage at Cernavoda Unit no.1. This paper also defines personnel responsibilities and key nomenclature and a means for evaluating prospective work tasks and activities against standardized criteria, in order to identify the appropriate level of the required FME controls. (author)

  20. Foreign Material Exclusion Program at CNE Cernavoda Nuclear Generating Station

    Energy Technology Data Exchange (ETDEWEB)

    Urjan, Daniel [S.N. ' Nuclearelectrica' SA, CNE Cernavoda Nuclear Power Plant, Medgidiei 2 Street, 905200 Cernavoda, Constanta (Romania)

    2008-07-01

    In the face of a continuing attention to operations and maintenance costs at nuclear power plants, the future of the industry depends largely upon increasing plant availability and improving operating efficiency. The success in achieving these objectives is dependent upon the success of each plant's equipment maintenance program. Preventing the introduction of foreign materials into a nuclear power plant system or component requires a careful, thoughtful, and professional approach by all site personnel. This paper describes a proactive approach to prevent the introduction of foreign material into systems and components, by providing an overview of technical considerations required to develop, implement, and manage a foreign material exclusion program at CNE Cernavoda Unit 1 and 2 Nuclear Power Station. It is also described an example of Foreign Material Intrusion which happened during the 2003 planned maintenance outage at Cernavoda Unit no.1. This paper also defines personnel responsibilities and key nomenclature and a means for evaluating prospective work tasks and activities against standardized criteria, in order to identify the appropriate level of the required FME controls. (author)

  1. Foreign Material Exclusion Program at CNE Cernavoda Nuclear Generating Station

    International Nuclear Information System (INIS)

    Urjan, Daniel

    2008-01-01

    In the face of a continuing attention to operations and maintenance costs at nuclear power plants, the future of the industry depends largely upon increasing plant availability and improving operating efficiency. The success in achieving these objectives is dependent upon the success of each plant's equipment maintenance program. Preventing the introduction of foreign materials into a nuclear power plant system or component requires a careful, thoughtful, and professional approach by all site personnel. This paper describes a proactive approach to prevent the introduction of foreign material into systems and components, by providing an overview of technical considerations required to develop, implement, and manage a foreign material exclusion program at CNE Cernavoda Unit 1 and 2 Nuclear Power Station. It is also described an example of Foreign Material Intrusion which happened during the 2003 planned maintenance outage at Cernavoda Unit no.1. This paper also defines personnel responsibilities and key nomenclature and a means for evaluating prospective work tasks and activities against standardized criteria, in order to identify the appropriate level of the required FME controls. (author)

  2. Implementing Data Acquisition Systems DAS1 and DAS2 at Cernavoda Full-Scope Simulator Main Control Room based on the SIEN2007 solution

    International Nuclear Information System (INIS)

    Ionescu, Ana Maria; Tutuianu, Bogdan; Ionescu, Teodor

    2009-01-01

    Modern personnel training, re-training and licensing is a guarantee of NPP's safe reliable operation. Cernavoda NPP personnel training system is the main objective of its specialized department built up as Training Center (TC), directly supervised by Administration of the National Nuclearelectrica Society (SNN) and National Regulatory Body for Nuclear Activities (CNCAN). It was implemented to ensure the abilities, skills and knowledge required by the safe reliable operation of the nuclear reactor by the Main Control Room (MCR) operators. This objective was reached through training lessons taught and tested on the Full Scope Simulator (FSS), the TC's main training tool, a replica of the MCR of the real plant. Its description is the subject of this paper. The TC's FSS includes a computer network equipped with a software connected to the specialized program DATAPATH supplied for Cernavoda FSS by the FSS provider, delivered by L-3/ MAPPS. An alternative to DATAPATH Communication of the L 3/MAPPS Simulation System, developed by Cernavoda Full Scope Simulator Staff, was presented in the previous edition of the symposium (see the SIEN 2007 paper). This original solution is now already applied in order to connect to simulation process Data Acquisition Systems DAS1 and DAS2, two new systems already installed in the real MCR but not included by the Cernavoda FSS initial design. Communication between simulation software and DAS1 and DAS2, considered to be simple receivers of simulated data both as much alike as the two DASs from real plant, is performed in parallel with DATAPATH in a safe mode and without affecting simulation process. This paperwork presents the above mentioned application of this communication solution, developed by the Cernavoda NPP Full Scope Simulator Staff with details about the hardware/software solutions and their performance, training impact, cost and benefits. (authors)

  3. Report of the IPERS (International Peer Review Service) review mission for the Cernavoda nuclear power plant probabilistic safety evaluation (CPSE -PHASE B) in Romania 3 to 14 July 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the results of the IAEA International Peer Review Services review of the internal events Level 1 probabilistic safety assessment (PSA) for the Cernavoda, Unit 1 NPP. The review was based on the PSA documentation available and on intensive communications with the analysis team and representatives from the utility and the plant operator. 7 refs, figs, tabs

  4. NPP Tropical Forest: Consistent Worldwide Site Estimates, 1967-1999, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains documented field measurements of NPP components for 39 old-growth tropical forests distributed worldwide between latitudes 23.58 N and 23.58...

  5. Experience from the transportation of irradiated WWER-440 fuel assemblies at the Kozloduy NPP site after a short cooling time

    International Nuclear Information System (INIS)

    Stoyanova, I.; Kamenov, A.; Byrzev, L.; Christoskov, I.

    2003-01-01

    Results from the analysis and experimental verification of the radiation and shielding characteristics of non-standard loading patterns of the VSPOT transport cask used for transportation of irradiated fuel assemblies after a short cooling time (120 180 days) on the site of the Kozloduy NPP are presented. An additional safety criterion related to the introduced modifications to the standard procedure of using the transport cask is formulated and discussed (Authors)

  6. The Cernavoda project - past and future

    International Nuclear Information System (INIS)

    Glodeanu, F.; Campureanu, T.; Chirica, T.; Popescu, D.

    1995-01-01

    The history of the Cernavoda nuclear power station in Romania is traced. It was conceived in 1977 as five unit CANDU-6 station and agreements were concluded on engineering, procurement and financial assistance with Atomic Energy of Canada Ltd (AECL) and Ansaldo of Italy. Delays in construction were created from the first, however, by efforts to manufacture as many components as possible in Romania, unfamiliarity with nuclear project management and the disadvantages of a highly centralised economy. Political changes since December 1989 have led to a new approach to project implementation. The Romanian Electricity Authority (RENEL), signed a new contract with AECL and Ansaldo in August 1991 to perform the project management for the completion of Cernavoda 1. The project has progressed very well and by the beginning of 1995 more than 90% of the plant systems were ready for commissioning and a full operating shift was in place. As a second phase of the nuclear power programme RENEL plans to complete Cernavoda 2, the construction of which was suspended at 30% completion. The three other units will be preserved in their present preliminary stage of construction up to 2000 while finance is sought for their completion. Nuclear power is seen as an environmentally clean means of meeting Romania's growing energy demand as the economy develops. (UK)

  7. Belene NPP

    International Nuclear Information System (INIS)

    Tsvetanov, P.

    1990-01-01

    The book presents the main results of the studies of the Bulgarian Academy of Sciences (BAS) on the construction of a new nuclear power plant at Belene on the Danube river. The programme of the studies comprises five areas: the socio-economic and energy development and the necessity of the commissioning; a technical project and design level of the equipment (safety, radioactivity control, waste disposal and economic efficiency of the power plant); the seismic properties of the construction site; the corresponding risk and design features of the plant; the ecological impacts of the NPP and public opinion. The studies in the different areas have been carried out by independent teams, fully responsible for the formulated topical conclusions. The general opinion of the BAS voiced in the book is that the construction of Belene NPP is not sufficiently substantiated and is considered unacceptable. 94 refs., 53 fig., 56 tabs. (R.Ts.)

  8. Provisional English Translation by the IAEA of Notification Faxes Sent by the Fukushima Daiichi NPP Site Superintendent to Off-Site Officials on 11 March 2011. Annex I of Technical Volume 3

    International Nuclear Information System (INIS)

    2015-01-01

    This annex contains a provisional English translation of the faxes sent by the Fukushima Daiichi NPP Site Superintendent to METI, the Governor of Fukushima Prefecture and the Mayors of Okuma and Futaba on 11 March 2011

  9. Approach to development and use of PSA Level 2 analysis for the Cernavoda nuclear power plant

    International Nuclear Information System (INIS)

    Turcu, I.; Deaconu, R.; Radu, G.

    1998-01-01

    This paper first describes the status of PSA activities for the Cernavoda NPP and the extension of the PSA work to include Level 2 PSA. Important characteristics of this reactor type for Level 2 PSA are outlined. Due to the specific layout of the CANDU reactor the evolution of severe accidents is considerably different to vessel type LWRs. Accidents can be roughly categorized into three categories, ''''severe accidents'''' which lead to the loss of core structural integrity, delayed loss of core structural integrity as a consequence of the loss of heat sinks, and fuel channel failures. The current work for modelling accident progression in the core region is described. The elements for the Level 2 PSA including definition of PDSs, probabilistic containment logic and source term calculation are outlined. It is pointed out that uncertainties have to be considered which are contained in the models to bridge knowledge gaps. For this purpose sensitivity studies will be carried out for key modelling assumptions. (author)

  10. Cernavoda nuclear power plant: Modifications in the fire protection measures of the CANDU 6 standard design

    International Nuclear Information System (INIS)

    Covalschi, V.

    1998-01-01

    Having as purpose the improvement of fire safety at the Cernavoda NPP - both in the prevention and the protection aspects in the case of fire - we implemented some modifications in the CANDU 6 standard design. These improvements are inspired, mainly, from two sources: the world-wide achievements in the field of fire protection techniques, introduced in nuclear power plants since the middle of 70's, when the CANDU 6 design was completed; the national practice and experience in fire protection, usually applied in industrial objectives (conventional power plants, in particular). The absence of any incident may be considered as a proof of the efficiency of the implemented fire preventing and protection measures. (author)

  11. Optimal organization of structural analysis and site inspection for the seismic requalification of Paks NPP

    International Nuclear Information System (INIS)

    Contri, P.

    1996-01-01

    The analysis described in this report deals with a numerical procedure aimed for the assessment of a methodology for the optimal organization of data collection, in the context of seismic requalification of structures and components of existing nuclear power plants. The presented procedure has quite a general application and an example was chosen for the Paks NPP where seismic requalification is in progress. The assessment was carried out in reference to the following main tasks: structure and soil data analysis; numerical model generation; deterministic dynamic analysis description; reliability analysis framework discussion; transfer function calculation via response surface approach; and the sensitivity evaluation

  12. Strategic maintenance plan for Cernavoda steam generators

    International Nuclear Information System (INIS)

    Cicerone, T.; Dhar, D.; VandenBerg, J.P.

    2002-01-01

    Steam generators are among the most important pieces of equipment in a nuclear power plant. They are required full time during the plant operation and obviously no redundancy exists. Past experience has shown that those utilities which implemented comprehensive steam generator inspection and maintenance programs and strict water chemistry controls, have had good steam generator performance that supports good overall plant performance. The purpose of this paper is to discuss a strategic Life Management and Operational-monitoring program for the Cernavoda steam generators. The program is first of all to develop a base of expertise for the management of the steam generator condition; and that is to be supported by a program of actions to be accomplished over time to assess their condition, to take measures to avoid degradation and to provide for inspections, cleaning and modifications as necessary. (author)

  13. Initial data of seismic input and soil conditions of Kozloduy NPP site. Extension to Part 2 soil conditions, issued October '93

    International Nuclear Information System (INIS)

    Boyadjiev, Z.

    1995-01-01

    On the basis of the results of the carried out experimental (laboratory and in situ) investigations of the dynamic characteristics, the following conclusions for the Kozloduy NPP site are presented. (1) The established through experimental studies relationships for the shear module and the damping factor as strain dependent of representative samples of soils of the site profile, can be used for all similar soils in the profile in the different parts of the site, taking into account the possible differences by means of the initial shear module in the normalized relationship for the respective generalized soil type. (2) When solving the problems of the site response and the 'soil - structure analysis', the geotechnical seismic model of the 'free field' profile can be assumed for all parts of the NPP site. (3) The changes of the lithological profile in different parts of the site, in respect to type and thickness, as well as in view of the different way and depth of the NPP structures foundation, make it necessary the elaboration of a geotechnical seismic model of the profile below the foundation plates of the reactor buildings of the NPP units in each particular case. These models can be made out on the basis of the summarized data about the shear velocities of the soil types, the lithological data of the studied boreholes in these places and the data having natural bulk density from 30 - 40 m depth determined by the laboratory studies of samples of these soils, assuming with approximation that the geotechnical seismic model below this depth is the same as the one of the 'free field'. (4) Studies have been carried out through in situ and laboratory studies of all the fundamental structures on the NPP site and the results of them are sufficient as an addition to the present initial data for solving the problems of the site response and the 'soil-structure inter-action' analyses of each structure

  14. Modernization of tritium in air monitoring system for CANDU type NPP

    International Nuclear Information System (INIS)

    Purghel, L.; Iancu, R.; Popescu, M.

    2009-01-01

    Nuclear energy provides at present one third of Europe's electricity with nearly no greenhouse-gas emissions. Sustained efforts are now being conducted to harmonize regulations all over Europe through WENRA and to converge on technical nuclear safety practices within the TSO network ETSON (European Technical Safety Organizations Network). In order to achieve this goals of safety function, IFIN-HH together with CITON developed a new solution to improve the Tritium Monitoring System (TMS) of Cernavoda NPP and the new generation of CANDU type reactors, using Tritium in air Intelligent Monitors (TIM) developed and patented by IFIN-HH. The paper presents a comparative analysis between the technical characteristics of traditional solutions implemented in CANDU type NPP, particularly in Cernavoda NPP Unit 2 and the newly proposed solution. (authors)

  15. Seismic assessment of a site using the time series method

    International Nuclear Information System (INIS)

    Krutzik, N.J.; Rotaru, I.; Bobei, M.; Mingiuc, C.; Serban, V.; Androne, M.

    2001-01-01

    1. To increase the safety of a NPP located on a seismic site, the seismic acceleration level to which the NPP should be qualified must be as representative as possible for that site, with a conservative degree of safety but not too exaggerated. 2. The consideration of the seismic events affecting the site as independent events and the use of statistic methods to define some safety levels with very low annual occurrence probabilities (10 -4 ) may lead to some exaggerations of the seismic safety level. 3. The use of some very high values for the seismic accelerations imposed by the seismic safety levels required by the hazard analysis may lead to very expensive technical solutions that can make the plant operation more difficult and increase the maintenance costs. 4. The consideration of seismic events as a time series with dependence among the events produced may lead to a more representative assessment of a NPP site seismic activity and consequently to a prognosis on the seismic level values to which the NPP would be ensured throughout its life-span. That prognosis should consider the actual seismic activity (including small earthquakes in real time) of the focuses that affect the plant site. The method is useful for two purposes: a) research, i.e. homogenizing the history data basis by the generation of earthquakes during periods lacking information and correlation of the information with the existing information. The aim is to perform the hazard analysis using a homogeneous data set in order to determine the seismic design data for a site; b) operation, i.e. the performance of a prognosis on the seismic activity on a certain site and consideration of preventive measures to minimize the possible effects of an earthquake. 5. The paper proposes the application of Autoregressive Time Series to issue a prognosis on the seismic activity of a focus and presents the analysis on Vrancea focus that affects Cernavoda NPP site by this method. 6. The paper also presents the

  16. A tsunami PSA methodology and application for NPP site in Korea

    International Nuclear Information System (INIS)

    Kim, Min Kyu; Choi, In-Kil

    2012-01-01

    Highlights: ► A methodology of tsunami PSA was developed in this study. ► Tsunami return period was evaluated by empirical method using historical tsunami record and tidal gauge record. ► Procedure of tsunami fragility analysis was established and target equipments and structures for investigation of tsunami fragility assessment were selected. ► A sample fragility calculation was performed for the equipment in Nuclear Power Plant. ► Accident sequence of tsunami event is developed by according to the tsunami run-up and draw down, and tsunami induced core damage frequency (CDF) is determined. - Abstract: A methodology of tsunami PSA was developed in this study. A tsunami PSA consists of tsunami hazard analysis, tsunami fragility analysis and system analysis. In the case of tsunami hazard analysis, evaluation of tsunami return period is a major task. For the evaluation of tsunami return period, numerical analysis and empirical method can be applied. In this study, tsunami return period was evaluated by empirical method using historical tsunami record and tidal gauge record. For the performing a tsunami fragility analysis, procedure of tsunami fragility analysis was established and target equipments and structures for investigation of tsunami fragility assessment were selected. A sample fragility calculation was performed for the equipment in Nuclear Power Plant. In the case of system analysis, accident sequence of tsunami event is developed by according to the tsunami run-up and draw down, and tsunami induced core damage frequency (CDF) is determined. For the application to the real Nuclear Power Plant, the Ulchin 56 NPP which located in east coast of Korean peninsula was selected. Through this study, whole tsunami PSA working procedure was established and example calculation was performed for one of real Nuclear Power Plant in Korea. But for more accurate tsunami PSA result, there are many researches needed for evaluation of hydrodynamic force, effect of

  17. Issues on safe radioactive waste management at ChNPP site in International Shelter Implementation Plan

    International Nuclear Information System (INIS)

    Bykov, V.; Kilochytska, T.; Gromyko, S.; Kadkin, Y.; Kondratiev, S.; Pavlenko, A.; Bogorinski, P.

    2003-01-01

    The International Shelter Implementation Plan (SIP) [1], is aimed to convert the ChNPP unit 4, destroyed by a beyond-design accident in 1986, into an environmentally safe facility by means of large-scale projects such as stabilization of the existing Sarcophagus (Shelter), construction of a New Safe Confinement (NSC), and installation of engineering and monitoring systems. This report presents some important safety issues concerning radioactive waste (RAW) management at the Shelter. One of the main problems of RAW management is to dispose of large volumes of RAW generated during ground preparation work. It is necessary that RAW be sorted carefully to separate low-active radioactive waste (LLW), which will be the majority, from high-level waste. Considering the fact that the Shelter is in the exclusion zone, the interim storage of LLW in this zone is possible, but a set of safety measures is required, e.g. prevention of dust generation or spreading of radioactivity with water. Another problem is high level RAW management. Highly radioactive fragments of the core, including fuel were ejected during the accident and are now buried under the man-made layer around the Shelter. Unanticipated disclosure of such fragments may happen during any ground preparation work as well as during clearing of premises inside the damaged buildings. Therefore, permanent radiation monitoring is required to prevent any intolerable exposure of workers. Unanticipated disclosure of high-active radioactive waste (HLW) could lead to considerable delay of any work. Since it is particularly difficult to remove HLW from those locations, which can not be easily accessed with removal equipment, such waste needs to be confined and properly shielded at in situ. Due to absence of a permanent HLW storage, an interim storage needs to be provided for in the territory of the Sarcophagus. (author)

  18. Contributions to a methodology for periodical verification of the parameters of the control systems at Cernavoda Nuclear plant Unit 1

    International Nuclear Information System (INIS)

    Tapu, Cornel; Anescu, George

    1998-01-01

    A model identification methodology for periodical verification of the regulating system parameters at Cernavoda NPP Unit 1 was developed. As support to this methodology, the computer program MODELIDENT was implemented in the Java programming language. This program is used for off-line evaluation of the real regulating systems characteristic parameters using an identification algorithm which takes as input data the system response collected for different input excitation signals, a structurally similar model of the analyzed regulating system, and some starting guess value of the unknown parameters. The real values of the parameters are determined during MODELIDENT program execution by applying an iterative algorithm and afterwards are retained as nominal reference values. The success of the identification algorithm is strongly dependent on how appropriately the structure of model's transfer function is chosen. By repeating periodically the identification method, using newly collected data from the process, the current value of the parameters are determined. Any deviations of the new values relative to the nominal reference values are interpreted as de-calibration of the control equipment and in this case corrective maintenance actions have to be taken. With the implementation of the presented methodology at Cernavoda NPP Unit 1 we can make the statement that the preventive maintenance activity is gaining a predictive feature, which can lead to the elimination of major degradation possibilities in the performances of the RS equipment and consequently to increase the NPP availability. On the basis of the experience gained in the practical application of the presented methodology we expect that the identification method will also have beneficial effects in the optimal control of the process systems and also in the activity of Full Scope Simulator software maintenance (the reference values of the identified parameters being used for fine tuning of the simulation models

  19. Developing Off-site Emergency Preparedness and Response Model (OEPRM) for Severe Accident of NPP in a Densely Populated Country Using System Dynamics Approach

    Energy Technology Data Exchange (ETDEWEB)

    Hossena, Muhammed Mufazzal; Kang, Kyoung Ho; Song, Jin Ho [KAERI, Deajeon (Korea, Republic of)

    2016-05-15

    The main objectives of this study are to find the influencing factors of systems and sub-systems of OEPRM, to find the interdependency among the influencing factors, and to develop a conceptual qualitative OEPRM for densely populated NPP country in case of SA using system dynamics (SD). NPP accidents are classified as nuclear accidents and incidents depending on the severity. Severe accident (SA) is certain low probability accident that are beyond design basis accident which may arise due to multiple failures of safety systems leading to significant core degradation and jeopardize the integrity of many or all of the barriers to the release of radioactive material. The weakness to the off-site emergency response in the time of Fukushima accident was observed. So, it is crucial to develop an off-site emergency preparedness and responses model (OEPRM) for radiological emergency in densely populated country from the Fukushima emergency response lesson. In this study, an OEPRM is developed for densely populated NPP country to mitigate radiological effects in case of SA using SD approach. Besides, this study focuses the weakness of emergency response in Fukushima accident and proposed solution approach. The development of OEPRM in case of SA of NPP is very complex because of the involvement of various organization and it requires highly specialized agencies and technical experts. Moreover, if the country is agriculture based, it will make completely sophisticated.

  20. Developing Off-site Emergency Preparedness and Response Model (OEPRM) for Severe Accident of NPP in a Densely Populated Country Using System Dynamics Approach

    International Nuclear Information System (INIS)

    Hossena, Muhammed Mufazzal; Kang, Kyoung Ho; Song, Jin Ho

    2016-01-01

    The main objectives of this study are to find the influencing factors of systems and sub-systems of OEPRM, to find the interdependency among the influencing factors, and to develop a conceptual qualitative OEPRM for densely populated NPP country in case of SA using system dynamics (SD). NPP accidents are classified as nuclear accidents and incidents depending on the severity. Severe accident (SA) is certain low probability accident that are beyond design basis accident which may arise due to multiple failures of safety systems leading to significant core degradation and jeopardize the integrity of many or all of the barriers to the release of radioactive material. The weakness to the off-site emergency response in the time of Fukushima accident was observed. So, it is crucial to develop an off-site emergency preparedness and responses model (OEPRM) for radiological emergency in densely populated country from the Fukushima emergency response lesson. In this study, an OEPRM is developed for densely populated NPP country to mitigate radiological effects in case of SA using SD approach. Besides, this study focuses the weakness of emergency response in Fukushima accident and proposed solution approach. The development of OEPRM in case of SA of NPP is very complex because of the involvement of various organization and it requires highly specialized agencies and technical experts. Moreover, if the country is agriculture based, it will make completely sophisticated

  1. Risk analysis of NPP in multi-unit site for configuration of AAC power source

    International Nuclear Information System (INIS)

    Kim, Myung Ki

    2000-01-01

    Because of the difficulties in finding new sites for nuclear power plants, more units are being added to the existing sites. In these multi-unit sites, appropriate countermeasures should be established to cope with the potential station blackout (SBO) accident. Currently, installation of additional diesel generator (DG) is considered to ensure an alternative AC power source, but it has not been decided yet how many DGs should be installed in a multi-unit site. In this paper, risk informed decision making method, which evaluates reliability of electrical system, core damage frequency, and site average core damage frequency, is introduced to draw up the suitable number of DG in multi-unit site. The analysis results show that installing two DGs lowered the site average core damage frequency by 1.4% compared to one DG in six unit site. In the light of risk-informed decisions in regulatory guide 1.174, there is no difference of safety between two alternatives. It is concluded that one emergency diesel generator sufficiently guarantees safety against station blackout of nuclear power plants in multi-unit site. (author)

  2. The Hifrensa Site of Vandellos I NPP, Basis for a New Future

    International Nuclear Information System (INIS)

    Albet, V.

    2000-01-01

    This article presents the HIFRENSA Site in Vandellos as the basis for a new future and explains the process developed to achieve this new reality. This includes a brief description of the site, an explanation of the analysis that has been carried out on installation reuse, and a review of the potential uses. Finally, it reflects on the strategic value of the Site that gives meaning to all the business efforts and actions undertaken by HIFRENSA to manage the future value of this asset both for the company itself and for society in general. (Author)

  3. Safety assessment of multi-unit NPP sites subject to external events

    International Nuclear Information System (INIS)

    Samaddar, Sujit; Hibino, Kenta; Coman, Ovidiu

    2014-01-01

    This paper presents a framework for conducting a probabilistic safety assessment of multi-unit sites against external events. The treatment of multiple hazard on a unit, interaction between units, implementation of severe accident measures, human reliability, environmental conditions, metric of risk for both reactor and non-reactor sources, integration of risk and responses and many such important factors need to be addressed within the context of this framework. The framework facilitates the establishment of a comprehensive methodology that can be applied internationally to the peer review of safety assessment of multi-unit sites under the impact of multiple external hazards. In summary, it can be said that the site safety assessment for a multi-unit site will be quite complex and need to start with individual unit risk assessments, these need to be combined considering the interactions between units and their responses, and the fragilities of the installations established considering the combined demands from all interactions. Using newly established risk metric the risk can then be integrated for the overall site. Fig. 2 shows schematically such a proposal. Much work has to done and the IAEA has established a working group that is systematically establishing the structure and process to incorporate the many issues that are a part of a multi-unit site safety assessment. (authors)

  4. Geomorphological condition and sea bottom sediment characteristics of Sebagin coast for NPP site evaluation in South Bangka

    International Nuclear Information System (INIS)

    Yuliastuti; Heni Susiati; Yarianto Sugeng Budi Susilo

    2015-01-01

    Study on geomorphological condition and sea bottom sediment in the coastal area of Sebagin, South Bangka Regency, Bangka Belitung Province has been performed. Geomorphological of the seabed was valuable to identify geological structures that exist on the seabed layers. Whereas, sediments seabed characteristics was useful to provide portrait of seabed layer due to the stability of NPP site concerning the seismic aspect and the determination of water intake position. The objective of the study was to evaluate geomorphological condition and sea bed sediment characteristics in the South Bangka sea. Methodology used for evaluating geomorphological of the sea bed were Multi Beam Echo Sounder (MBES) and Single Beam Echo Sounder (SBES), while for sea bottom sediment characteristics, high resolution seismic reflection using SBP together with sediment sample analysis were used. The result of the study showed that the study area was a shallow water sea with a depth range of 1-59 m. Geomorphological profile of the sea bed tend to be irregular and based on the seismic interpretation, there were no fault exists. Result analysis on the sea bottom sediment showed that clay distribution dominated the study area. (author)

  5. Treatment, conditioning and packaging for final disposal of low and intermediate level waste from Cernavoda: a techno-economic assessment

    Energy Technology Data Exchange (ETDEWEB)

    Suryanarayan, S.; Husain, A. [Kinectrics Inc., Toronto, ON (Canada); Fellingham, L.; Nesbitt, V. [Nuvia Ltd., Didcot, Oxfordshire (United Kingdom); Toro, L. [Mate-fin, Bucharest (Romania); Simionov, V.; Dumitrescu, D. [Cernavoda Nuclear Power Plant, Cernavoda (Romania)

    2011-07-01

    National Nuclearelectrica Society (SNN) owns and operates two CANDU-6 plants at Cernavoda in Romania. Two additional units are expected to be built on the site in the future. Low and intermediate level short-lived radioactive wastes from Cernavoda are planned to be disposed off in a near-surface repository to be built at Saligny. The principal waste streams are IX resins, filters, compactable wastes, non-compactables, organic liquids and oil-solid mixtures. Their volumetric generation rates per reactor unit are estimated to be: IX resins (6 m{sup 3}/y), filters (2 m{sup 3}/y), compactables (23 m{sup 3}/y) and non-compactables (15 m{sup 3}/y). A techno-economic assessment of the available options for a facility to treat and condition Cernavoda's wastes for disposal was carried out in 2009 based on projected waste volumes from all four units. A large number of processes were first screened to identify viable options. They were further considered to develop overall processing options for each waste stream. These were then consolidated to obtain options for the entire plant by minimizing the number of unit operations required to process the various waste streams. A total of 9 plant options were developed for which detailed costing was undertaken. Based on a techno-economic assessment, two top ranking plant options were identified. Several scenarios were considered for implementing these options. Amongst them, a contractor run operation of a facility located on the Cernavoda site was considered to be more cost effective than operating the facility using SNN personnel. (author)

  6. Technical assessment concept of geological aspect to define site NPP prospectus in Indonesia

    International Nuclear Information System (INIS)

    Akhmad Muktaf Haifani

    2013-01-01

    Geological aspects become an important aspect in determining the prospective nuclear power plant site. Geological investigation can be categorized based on the spatial scale of Regional and Local and every stage will have different levels of investigation. Understanding Regional Tectonics and Regional Geology of Indonesia is very important and helps to facilitate the evaluators to review documents. Unification of standard of site conformity assessment in terms tectonic aspect particularly geological stability becomes very necessary in the assessment of the suitability of the proposed licensed document, given the tectonic-forming process in Indonesia is highly variable. Safety criteria is key parameters that must be considered to solve any problems and a proper bridge in determining the site parameters of the proposed by applicants and compliance with any requirement of Regulatory Body. (author)

  7. End of mission report on seismic safety review mission for Belene NPP site

    International Nuclear Information System (INIS)

    Gurpinar, A.; Mohammadioun, B.; Schneider, H.; Serva, L.

    1995-01-01

    Upon the invitation of the Bulgarian government through the Committee for the Peaceful Uses of Atomic Energy and within the framework of the implementation of the Technical Cooperation project BUL/9/012 related to site and seismic of NPPs, a mission visited Sofia 3 - 7 July 1995. The mission constituted a follow-up of the interim review of subjects related to tectonic stability and seismic hazard characterization of the site which was performed in September 1993. The main objective of the mission was the final review of the subjects already reviewed in September 1993 as well as issues related to geotechnical engineering and foundation safety. The main terms of reference of the present mission was to verify the implementation of the recommendations of the Site Safety Review Mission of June 1990. This document gives findings on geology-tectonics, seismology and foundation safety. In the end conclusions and recommendations of the mission are presented

  8. Application of GIS in prediction and assessment system of off-site accident consequence for NPP

    International Nuclear Information System (INIS)

    Wang Xingyu; Shi Zhongqi

    2002-01-01

    The assessment and prediction software system of off-site accident consequence for Guangdong Nuclear Power Plant (GNARD2.0) is a GIS-based software system. The spatial analysis of radioactive materials and doses with geographic information is available in this system. The structure and functions of the GNARD system and the method of applying ArcView GIS are presented

  9. Vandellos 1 NPP partial site release after level 2 decommissioning, using Marssim

    Energy Technology Data Exchange (ETDEWEB)

    Medinilla, G.; Sanchez, M.; Peinador, M. [Initec-Westinghouse, Madrid (Spain); Lopez, M.T. [ENRESA, Madrid (Spain)

    2008-07-01

    The Vandellos 1 nuclear power plant is a french technology 480 MWe graphite gas cooled reactor, located in the spanish mediterranean coast, in the province of Tarragona. It started commercial operations in 1972 and that was definitively shutdown after a turbine fire in 1989, being decommissioned by ENRESA to reach IAEA level 2 in 2005, starting a dormancy period that will last around 20 years before the final phase of the decommissioning is executed to reach the ''greenfield'' state. For the plant remaining structures during this dormancy period the site needs not to keep its original size of approx. 130000 m{sup 2}, so ENRESA took the decision of starting a partial site release process of almost a half of the site aiming to exclude that part from regulatory control, applying US MARSSIM methodology. Main activities included: - Site radiological characterization - Derived concentration guideline limits calculation - Definition and classification of survey units Development and testing of scanning devices and procedures - Pilot application of full process to two survey units A summary of the scope and results of these activities is presented in this paper. (authors)

  10. The dry spent RBMK fuel cask storage site at the Ignalina NPP in Lithuania

    International Nuclear Information System (INIS)

    Penkov, V.V.; Diersch, R.

    1999-01-01

    At present, there are about 15,000 spent RBMK fuel assemblies stored in the water pools near the reactors at the Ignalina Nuclear Power Plant (INPP). Part of them are cut in two bundles and stored in standardized baskets in the pools. Each basket is loaded with 102 bundles. For long-term interim storage of this fuel, it was decided to use dry storage in casks. For this reason, the total activity to be stored is split into individual units (casks). Each cask represents a closed and independent safety system, fulfilling all safety-relevant requirements for both normal operational and hypothetical accidental conditions. The main safety relevant features of the storage cask system are: (1) Inherent safety system; (2) Double barrier system; (3) Passive cooling by natural convection; (4) Safety against accidents. The cask dry storage system is a cost effective and multi-functional system for storage, transport after the operation time and final disposal under consideration of additional protective elements. From an economical point of view, cask storage has a number of advantages. Two cask types have been intended for the INPP storage site: (1) The CASTOR RBMK cask made of ductile cast iron; (2) The CONSTOR RBMK sandwich cask made of an inner and outer steel shell and reinforced heavy concrete. The CASTOR RBMK and the CONSTOR RBMK casks are designed to withstand severe storage site accidents and with help of impact limiters - to fulfil the IAEA test criteria for type B(U)F packages. The INPP spent RBMK fuel storage site is designed as an open air storage for an operational time of 50 years. The casks are arranged on the concrete storage pad. The site is equipped with a crane for cask handling and technological buildings and security systems. The safety analyses for fuel and cask handling and for cask handling and for cask technology at the site have been made and accepted by the Lithuanian Competent Authority. (author)

  11. Assessment of Muria geochemistry evolution and related to volcanic hazard to NPP site at Muria

    International Nuclear Information System (INIS)

    Basuki Wibowo; June Mellawati; Heni Susiati

    2011-01-01

    Study of geochemistry evolution aspect in Mt. Muria cycle to predict the level of volcanic hazards posed in the future on Muria nuclear power plant site was conducted. The purpose of the study was to determine the Muria geochemistry condition, tectonic patterns and to predict the level of volcanic hazard in the future on Muria nuclear power plant sites. The methodology used is the collection of secondary data on the complex geochemical conditions Muria volcanic in their life cycle, perform correlation geochemical cycle in its path towards conditions that most likely experienced tectonic, volcanic, and interpretation of the hazard posed. The study shows that geochemical conditions in Muria Volcano complex composed of potassium, low-yield product predicted high-temperature molten magma (decompression) and high potassium levels (compression). Pattern of tectonic decompression geochemical conditions associated with low potassium in Muria old, while the pattern of tectonic compression geochemical conditions associated with high potassium in young Muria. The level of volcanic hazard in the future indicated by the nature of non capable of Mt. Muria. (author)

  12. Screening criteria of volcanic hazards aspect in the NPP site evaluation

    International Nuclear Information System (INIS)

    Nur Siwhan

    2013-01-01

    Studies have been conducted on the completeness of regulation in Indonesia particularly on volcanic hazards aspects in the evaluation of nuclear power plant site. Volcanic hazard aspect needed to identify potential external hazards that may endanger the safety of the operation of nuclear power plants. There are four stages for evaluating volcanic hazards, which are initial assessment, characterization sources of volcanic activity in the future, screening volcanic hazards and assessment of capable volcanic hazards. This paper discuss the third stage of the general evaluation which is the screening procedure of volcanic hazards. BAPETEN Chairman Regulation No. 2 Year of 2008 has only one screening criteria for missile volcanic phenomena, so it required screening criteria for other hazard phenomena that are pyroclastic flow density; lava flows; avalanche debris materials; lava; opening hole new eruptions, volcano missile; tsunamis; ground deformation; and hydrothermal system and ground water anomaly. (author)

  13. IAEA Coordinates International Mission on Remediation of Areas Off-site Fukushima Daiichi NPP

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency (IAEA) will dispatch an international expert mission to Japan to assist the country in its planning to remediate the areas off-site from the Fukushima Daiichi Nuclear Power Plant. Following a request by the Government of Japan, the mission, comprising 12 international and IAEA experts from several countries, will visit Japan between 7 and 15 October 2011 under the leadership of Mr. Juan Carlos Lentijo, General Director for Radiation Protection at Spain's nuclear regulatory authority. The team will go to several locations in the Fukushima Prefecture and conduct meetings in Tokyo with Japanese officials to: Provide assistance to Japan in its plans to manage remediation efforts; Review the country's remediation strategies, plans and work; and Share its findings with the international community. The IAEA mission will provide an opportunity for the international experts to exchange views with the Japanese authorities involved in the decontamination effort and other interested parties. It will also provide an opportunity for the IAEA to take stock of lessons learned from this important decontamination initiative. At the end of the mission a preliminary summary report will be provided to the Government of Japan and be made publically available. The team is also planning to hold a press briefing at the end of the mission. The final report of the mission will be presented to the Government in the month following the conclusion of the mission. Background The accident at Fukushima Daiichi Nuclear Power Plant has led to the radiological contamination of large areas. The Government of Japan has been formulating a strategy and plans to implement countermeasures to remediate these areas. The IAEA organized an International Fact Finding Expert Mission Of The Fukushima Daiichi Nuclear Power Plant Accident Following The Great East Japan Earthquake And Tsunami, which was held between 24 May and 2 June 2011. The current mission is a

  14. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP KRSKO. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and the results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economical aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling all activities necessary for the decommissioning of the NPP KRSKO are presented. (author)

  15. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP Krsko. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for a decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill the decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economic aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling of all activities necessary for the decommissioning of the NPP Krsko are presented. (author)

  16. Application of remote sensing data and geographic information system (GIS) in the selection of a NPP potential site in west Kalimantan

    International Nuclear Information System (INIS)

    Heni Susiati; Yarianto SBS; Kurnia Anzhar; Bansyah Kironi; June Mellawati

    2015-01-01

    Potential site selection on spatial basis which applied throughout the coast of West Kalimantan has been performed by adding additional criteria compare to the criteria used in 2014. The objective of research is to get the potential site of nuclear power plants (NPP) in the coastal areas of West Kalimantan Province based on the applicable criteria. Research methods include collecting of primary data, interpretation of remote sensing data, and weighting analysis based on SIG. The research results obtained six of potential site for NPP, i e., Air Besar Village Kendawangan Sub-district Ketapang Regency (first rank), Sie Village Simpang Hilir Sub-district Kayong Regency (second rank), Sungai Kanan Village Muara Sub-district Ketapang Regency (third rank), Sungai Nanjung Village Matan Sodascorbate Ketapang Regency (fourth rank), Kendawangan Kanan Village Kendawangan Sub-district Ketapang Regency (fifth rank) dan Sungai Nanjung Village Matan Sub-district Ketapang Regency, Matang Village Paloh Sub-district, Sambas Regency (sixth rank). Analysis of land suitability showed that all potential has met the general and specific criteria, among other things because it is not a peat and far away from the settlements. (author)

  17. Technology for NPP decantate treatment realized at Kola NPP

    International Nuclear Information System (INIS)

    Stakhiv, Michael; Avezniyazov, Slava; Savkin, Alexander; Fedorov, Denis; Dmitriev, Sergei; Kornev, Vladimir

    2007-01-01

    At Moscow SIA 'Radon' jointly with JSC 'Alliance Gamma', the technology for NPP Decantate Treatment was developed, tested and realized at Kola NPP. This technology consists of dissolving the salt residue and subsequent treatment by ozonization, separation of the deposits formed from ozonization and selective cleaning by ferro-cyanide sorbents. The nonactive salt solution goes to an industrial waste disposal site or a repository specially developed at NPP sites for 'exempt waste' products by IAEA classification. This technology was realized at Kola NPP in December 2006 year. At this time more than 1000 m 3 of decantates log time stored are treated. It allows solving very old problem to empty decantates' tanks at NPPs in environmentally safe manner and with high volume reduction factor. (authors)

  18. NPP Prevlaka - Preparation of construction

    International Nuclear Information System (INIS)

    Bojic, K.

    1984-01-01

    On the basis of study 'Optimal electricity generation structure till the year 2000' production of 3 x 500 MWe in nuclear power plants has been anticipated. Second Croatian-Slovenian NPP project will be based on the same principles the first one (NPP Krsko) was based on. Preconstruction investigation studies are performed at site Prevlaka on river Sava downstream of Zagreb. Licensing procedure has started with republic Urban countryside planning activities. Preconstruction activities are planned to be finished by the end of 1986. while the construction is expected to start during 1987. Parallel to investigation studies for NPP Prevlaka, evaluation of nuclear technology and reactor type is planned to be made. (author)

  19. The seismic reassessment Mochovce NPP

    International Nuclear Information System (INIS)

    Baumeister, P.

    2004-01-01

    The design of Mochovce NPP was based on the Novo-Voronez type WWER-440/213 reactor - twin units. Seismic characteristic of this region is characterized by very low activity. Mochovce NPP site is located on the rock soil with volcanic layer (andesit). Seismic reassessment of Mochovce NPP was done in two steps: deterministic approach up to commissioning confirmed value Horizontal Peak Ground Acceleration HPGA=0.1 g and activities after commissioning as a consequence of the IAEA mission indicate higher hazard values. (author)

  20. Measurement of long-lived radionuclides in surface soil around F1NPP accident site by Accelerator Mass Spectrometry

    Energy Technology Data Exchange (ETDEWEB)

    Miyake, Yasuto; Matsuzaki, Hiroyuki [Department of Nuclear Engineering and Management, School of Engineering, The University of Tokyo, 7-3-1 Hongo, Bunkyo-ku, Tokyo (Japan); Sasa, Kimikazu; Takahashi, Tsutomu [AMS Group, Tandem Accelerator Complex, Research Facility Center for Science and Technology, University of Tsukuba, Tsukuba, Ibaraki 305-8577 (Japan)

    2015-10-15

    In March 2011, vast amounts of radionuclides were released into the environment due to the Fukushima Daiichi Nuclear Power Plant (F1NPP) accident. However, very little work has been done concerning accident-derived long-lived nuclides such as {sup 129}I (T{sub 1/2} = 1.57 × 10{sup 7} year) and {sup 36}Cl (T{sub 1/2} = 3.01 × 10{sup 5} year). {sup 129}I and {sup 131}I are both produced by {sup 235}U fission in nuclear reactors. Being isotopes of iodine, these nuclides are expected to behave similarly in the environment. This makes {sup 129}I useful for retrospective reconstruction of {sup 131}I distribution during the initial stages of the accident. On the other hand, {sup 36}Cl is generated during reactor operation via neutron capture reaction of {sup 35}Cl, an impurity in the coolant or reactor component. Resulting {sup 36}Cl/Cl ratio within the reactor is thus much higher compared to that in environment. Similar to {sup 129}I, {sup 36}Cl is expected to have leaked out during the accident and it is important to evaluate its effects. In this study, {sup 129}I concentrations were determined in several surface soil samples collected around F1NPP. Average {sup 129}I/{sup 131}I ratio was estimated to be 26.1 ± 5.8 as of March 11, 2011, consistent with calculations using ORIGEN2 code and other published data. {sup 36}Cl/Cl ratios in some of the soil samples were likewise measured and ranged from 1.1 × 10{sup −12} to 2.6 × 10{sup −11}. These are higher compared to ratios measured around F1NPP before the accident. A positive correlation between {sup 36}Cl and {sup 129}I concentration was observed.

  1. Measurement of long-lived radionuclides in surface soil around F1NPP accident site by Accelerator Mass Spectrometry

    Science.gov (United States)

    Miyake, Yasuto; Matsuzaki, Hiroyuki; Sasa, Kimikazu; Takahashi, Tsutomu

    2015-10-01

    In March 2011, vast amounts of radionuclides were released into the environment due to the Fukushima Daiichi Nuclear Power Plant (F1NPP) accident. However, very little work has been done concerning accident-derived long-lived nuclides such as 129I (T1/2 = 1.57 × 107 year) and 36Cl (T1/2 = 3.01 × 105 year). 129I and 131I are both produced by 235U fission in nuclear reactors. Being isotopes of iodine, these nuclides are expected to behave similarly in the environment. This makes 129I useful for retrospective reconstruction of 131I distribution during the initial stages of the accident. On the other hand, 36Cl is generated during reactor operation via neutron capture reaction of 35Cl, an impurity in the coolant or reactor component. Resulting 36Cl/Cl ratio within the reactor is thus much higher compared to that in environment. Similar to 129I, 36Cl is expected to have leaked out during the accident and it is important to evaluate its effects. In this study, 129I concentrations were determined in several surface soil samples collected around F1NPP. Average 129I/131I ratio was estimated to be 26.1 ± 5.8 as of March 11, 2011, consistent with calculations using ORIGEN2 code and other published data. 36Cl/Cl ratios in some of the soil samples were likewise measured and ranged from 1.1 × 10-12 to 2.6 × 10-11. These are higher compared to ratios measured around F1NPP before the accident. A positive correlation between 36Cl and 129I concentration was observed.

  2. Simulating the transient regime for main condensate system at Cernavoda NPP

    International Nuclear Information System (INIS)

    Nita, Iulian; Gheorghiu, Mihai; Prisecaru, Ilie; Dupleac, Daniel

    2005-01-01

    The purpose of this project is to make a Thermal Hydraulic Analysis of Main Condensate System for getting real-time answer of installation during regimes occurring during normal and abnormal operation. To obtain the analyses the MMS code was used. The boundaries of the systems analysis are extended to Main Feedwater System in order to get a realistic response of Deaerator equipment which are situated between those two systems and have entrances from both systems. In this way we made a complex analysis with main condenser and steam generators as boundaries. We obtained a model for the entire chain of condensate and feedwater preheater with interface just turbine bleed steam. From that we could reduce the number of assumptions necessary to make the analysis. The analyses consist in hydraulics and thermal hydraulics analyses, respectively. For the first case analysed are: - the nominal operation regime with main condensate pumps; - start-up regime with total circulate of condensate to condenser; - 25% MCR (Maximum Continuous Rate) regime (this regime was used in designing the condensate regulating valves at low flow; - 40% MCR regime (with circulate of some condensate flow to condenser); - operating regime of 60% MCR with one main condensate pump operating; - operating regime with auxiliary condensate pump; - operating regime with discharging a condensate flow to condensate storage tank. The thermal hydraulic analyses deal with normal and abnormal operating regimes, respectively. In the first case analysed are the following regimes: - nominal operating regime with main condensate pump operating 100% MCR; - transient regime, 100-80% MCR; - transient regime, 100-80-60% MCR with two pumps in operation and 60 % MCR with one main condensate pump in operation; - transient regime, 100-80-60-60-40 % MCR; - shut-down regime; - start-up regime from Hot zero power to rated power regime. Finally, for the abnormal operating regimes the analyses concerned: - transient regime 100-90% MCR with by-pass of LP1 (low pressure heater) and CC (Condensate Cooler); - transient regime, 100-90% MCR with by-pass of LP2 and LP3; - turbine trip; - reactor trip; - loss of two main condensate pumps. The results were compared with Heat Balance made by General Electric (turbine supplier) for several stationary regimes. (authors)

  3. Cernavoda NPP Unit 1: Operating experience program and plant specific performance indicators (level 2)

    International Nuclear Information System (INIS)

    Teodor, Vasile; Popa, Viorel

    1998-01-01

    The basis for the Operating Experience Program was set in place since early stages of the commissioning phase (1993), when a system based on the Canadian approach was implemented for reporting, reviewing, assessing and establishing of the necessary corrective action for unplanned events. This system provided excellent opportunity to train staff in unplanned event assessment methodology, and prepare the station for the formal reporting process following criticality in accordance with the licensing requirements. The formal process, set in place after criticality is described in Station Instruction Procedure SI-01365-P13 'Unplanned Event Report' and was developed under the supervision of Safety and Compliance Department. In parallel, a program for information exchange and trending of performance indicators was developed by Technical Services Department. The WANO recommendations following August 1997 Peer Review provided the opportunity for a better understanding and reconsideration of the Operating Experience Program. As a result, all the activities related to this topic were assigned to a new structure, within Safety and Compliance Department. As such an Operating Experience Group was created and a new program is now being developed in an integrated and centralized manner. The content of the paper is the following: - Overview; - Operating Experience Program; - Event Analysis (Unplanned Events Assessment System - UEIR Process- and Systematic Analysis of Operational Events - ACR Process); - Information Exchange Program; - Monitoring of Operating Experience - Plant Specific Performance Indicators; - Purpose; - Level 2 Performance Indicators. Four appendices are added containing: - A. Station performance indicators/targets (Level 2); - B. SPI (Station Performance Indicators - Level 2) - Graphics; - C. UEIR, LRS (Safety and Licensing Review Sheet), UEFR (Unplanned Event Follow-up Report), ACR and OPEX forms. (authors)

  4. Preventive maintenance program of motorized operated valves (MOV) at Cernavoda NPP

    International Nuclear Information System (INIS)

    Groza, M.; Moldoveanu, Edy

    2001-01-01

    This is a Power Point presentation. The following objectives are addressed: A. Determine the target of MOV program; B. Define the strategy for MOV; C. Establish the MOV program execution phases; D. Identification of key parameters; E. Examples. The target of MOV program is to improve the safety by ensuring the adequacy of safety valves and the reliability of safety equipment and, subsequently, to ensure the economic operation of the plant. Consequences of MV malfunction are indicated. The strategy for MOV program development is both general, namely, to define the minimal requirements of preventive /corrective maintenance activities for all MOV's according to design/ manufacture specification and particular, namely to identify MV's specific problems and the need for increasing/decreasing the preventing maintenance tasks or frequency established in 'general' MOV program. Strategy for MOV program development implies: - Establish MOV program applicability; - Develop diagnostic strategy (define key parameters ); - Perform program for engineering review; - Establish program for preventive maintenance; - Revise procedures for operating and maintenance tests; - Dynamic evaluation of MOV. The program execution phases are listed as follows: 1. Perform risk assessment of the MOV's to determine criticality level (program applicability); 2. Collect data to fill in MOV Application Data Sheet; 3. Perform engineering review to determine functional parameters acceptable range and determine key parameters; 4. Analysis for maintenance tasks / frequencies selection and determination of implementing actions (engineer review); 5. Prepare work packages for availability confirmation; 6. Schedule and plan corrective actions or provide input to other programs; 7. Schedule and plan implementing actions in preparation for program field execution; 8. Program field implementation; 9. Program monitoring, evaluation and optimization. The criteria defining the key operational and maintenance parameters are presented. Examples are given for minimum periodic maintenance tasks as well as for mechanical inspections and I - C measurements. Diagnostic sheets are also presented

  5. Assessing the consequences in a nuclear accident scenario at Cernavoda NPP

    International Nuclear Information System (INIS)

    Margeanu, Sorin; Angelescu, Tatiana

    2004-01-01

    Having in view a possible nuclear incident, considerable planning is necessary to reduce at manageable levels the types of decisions leading to effective responses concerning the public protection. One of the most important parts of an emergency response plan is the computerized system which allows to predict the radiological impact of the accident and to provide information in a manageable and effective form for evaluating alternative countermeasure strategies in the various stages of the accident. In this paper the PC-COSYMA results for early containment failure of a CANDU reactor are presented. The deterministic health effects arising in nuclear accident situation are also presented. As source term we have used the core inventory obtained with ORIGEN computer code. The essential input parameters for PC-COSYMA computer code are also done. (authors)

  6. Successful factors to a better maintenance effectiveness in Cernavoda NPP 's Unit 1

    International Nuclear Information System (INIS)

    Riedel, M.; Bigu, D.

    2001-01-01

    Two tables are presented titled 'Existing maintenance-specific and maintenance-related plant programs' and 'New programs intended to be developed', respectively. In the first table the following items are indicated and commented: 1. Corrective maintenance program; 2. EQ Program; 3. Equipment maintenance history program; 4. In service inspection program; 5. Lube oil analysis program; 6. MOVs program; 7. Operational test procedures; 8. Performance evaluation program; 9. Preventive maintenance program; 10. Spares management program; 11. Vibration monitoring program. In table 2 the following items are indicated and commented: 1. Check Valves program; 2. Electrical Cable Diagnostics; 3. Erosion-corrosion; 4. Temperature monitoring (infra red thermography; noncontact thermometer); 5. Airborne Ultrasound Detection program; 6. PdM Program. A flowchart is presented in figure 1 showing the maintenance strategies' selection. In figure 2 there is presented a flowchart showing the plants maintenance current approach. Finally, in figure 3 the station maintenance program is presented in a diagram structured on the following fields: concepts, requirements, strategies, specific programs and plans

  7. Experience from transportation of irradiated WWER-440 fuel assemblies at Kozloduy NPP site after a short cooling time

    International Nuclear Information System (INIS)

    Stoyanova, I.; Kamenov, A.; Byrzev, L.; Christoskov, I.

    2003-01-01

    The presented results from the computation and analysis of the radiation characteristics of the irradiated fuel assemblies by the date of their transportation according to the selected loading patterns of the VSPOT cask and following the modified technology of transportation, i.e. without replacement of the pool solution by pure condensate, as well as the corresponding experimental results, confirm the applicability of the newly introduced safety criterion for the selection of a loading pattern of the cask with irradiated fuel assemblies after a short cooling time. The comparison between measured and computed surface dose rates shows that during the procedure of transfer of irradiated fuel assemblies from the pools of Units 1 and 2 to the pools of Kozloduy NPP Units 3 and 4 all safety limits, incl. the radiation protection requirements, were met

  8. Simplified study for the proposed APR1400 condenser performance based on EL-DABAA SITE, EGYPT, with respect to BNPP and SHIN KORI NPP

    Energy Technology Data Exchange (ETDEWEB)

    Abdoelatef, M. Gomaa; Rezk, Osama; Lee, YonKwan [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-10-15

    • Perception of nuclear power as a convenient, economically competitive and viable source of energy which, if introduced in the country, would not only complement the traditional energy sources, but would also promote technological development and serve as an incentive for social and economic progress. In this paper we will introduce APR-1400 as the most likely selected reactor type for 1st Egyptian Nuclear Power Plant. Then we will study the optimized APR-1400 condenser performance based on El-Dabaa site conditions. As the climate conditions, especially the seawater temperatures (intake for the cooling system) having a direct effects on the condenser performance and the overall NPP Efficiency, we studied the seawater temperature change based on EL-Dabaa site conditions and it's feedback on the proposed APR-1400 condenser performance and the NPP efficiency. All of the calculations and analysis had been executed by using KINGS NPA by applying EL-Dabaa seawater temperature variations for the 2 types of APR-1400 Condensers (Shinkori, south Korea and Barakah, UAE), and the main findings were as follow: For the APR-1400 condensers (Shinkori and Barakah) performance • The average difference all over the year for saturation temperature, cooling water outlet temperature, and condenser pressure are 0.135 .deg. C, .05785 .deg. C, and 0.3948 mHgA respectively. This shows that the Barakah condenser performance is not significantly better than the shinkori condenser performance based on EL-Dabaa Conditions, especially if we considered the cost difference between the two condensers designs. For APR-1400 NPPs (Shinkori and Barakah) net efficiency • The average difference all over the year for the power productions and net efficiency are 1.4791 MWe and .00037 %, respectively.

  9. Emergency preparedness at Barsebaeck NPP in Sweden

    International Nuclear Information System (INIS)

    Olsson, R.; Lindvall, C.

    1998-01-01

    On-site emergency preparedness plan at Barsebaeck NPP is presented. In an emergency the responsibility of the NPP is to alarm the emergency organizations, spend all efforts to restore safe operation, assess the potential source term as to size and time, protect their own personnel, inform personnel and public. Detailed emergency procedures overview is provided

  10. Chernobyl NPP accident. Overcoming experience. Acquired lessons

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Vasil'chenko, V.N.; Klyuchnikov, A.A.; Prister, B.S.

    2006-01-01

    This book is devoted to the 20 anniversary of accident on the Chernobyl NPP unit 4. History of construction, causes of the accident and its consequences, actions for its mitigation are described. Modern situation with Chernobyl NPP decommissioning and transferring of 'Ukryttya' shelter into ecologically safe system are mentioned. The future of Chernobyl site and exclusion zone was discussed

  11. The FMEA Analysis for Fuel Handling System at Cernavoda Unit 2

    International Nuclear Information System (INIS)

    Park, Jin Hee; Kim, Tae Woon; Rhee, Bo Wook; Yoon, Chul; Kim, Hyeong Tae; Cho, In Gil; Kim, Seong Ho

    2006-01-01

    A Nuclear Safety Evaluation was performed by an independent assessor at the request of the regulatory authority CNCAN (Comisia Nationala pentru Controlul Activitatilor Nucleare. National Committee for Nuclear Activities Control in Romania) to provide an independent overview of all the nuclear safety aspects of Cernavoda Unit 2 under construction and an expert opinion whether the completed Cernavoda Unit-2 Nuclear Power Plant would satisfy current Western European nuclear safety objectives and practices. A report was produced (Cernavoda 2 Nuclear Safety Expert Project, 'Task 10 . Safety Evaluation Report', A.F.Parsons, NNC Limited, December 2001) and contains recommendations either mandatory or advisory. The FMEA study, one of the mandatory recommendations, is performing now for fuel handling system and radioactive waste handling system for Cernavoda unit 2 in Romania sponsored by KHNP. In this paper, only the FMEA study for fuel handling system is presented

  12. Organization of monitoring of agricultural products in NPP region

    International Nuclear Information System (INIS)

    Panteleev, L.I.; Spirin, E.V.; Sanzharova, N.I.

    1990-01-01

    Problem of organizing chemical and radiation monitoring of agricultural products in NPP region is considered. Attention is paid to monitoring during NPP siting and designing, to monitoring of radioactive contamination of agricultural products under normal NPP operation, emergency situations and decommissioning

  13. Spain in South Ukraine NPP

    International Nuclear Information System (INIS)

    Ibanez, M.

    1994-01-01

    A Technical Assistance Protocol was signed between the Governments of the GIS and the Commission of the European Union (CEU) on August 2, 1991 and this was the starting point of the TACIS program. In this article, the activities described are those related to the TACIS-92/93/94 on site technical assistance to South Ukraine NPP (SUK NPP). Within the scope of the TACIS 92 Program the CEU and the Ukrainian Authorities agreed a list of projects to be implemented at South Ukraine NPP with the aim to improve the operational safety of the plant. This part of the program is called TACIS 92 on-site activities. The total budget allocated to these projects is a MECU. The European Union ''utility'' selected to lead this program at South Ukraine NPP was UNESA and the first contract to cover our activities was signed in July 1993 between the CEU (Mr. Pablo Benavides) and UNESA (Mr. Pedro Rivero). The projects will be implemented at SUK NPP but according to the contract UNESA is ''The Consultant'' and GOSKOMATON (The Ukrainian Sate Committee on Nuclear Power Utilization) is the ''Recipient Institution''. (Author)

  14. Beyond designed functional margins in CANDU type NPP. Radioactive nuclei assessment in an LOCA type accident

    Directory of Open Access Journals (Sweden)

    Budu Andrei Razvan

    2015-01-01

    Full Text Available European Union's energy roadmap up to year 2050 states that in order to have an efficient and sustainable economy, with minimum or decreasing greenhouse gas emissions, along with use of renewable resources, each constituent state has the option for nuclear energy production as one desirable option. Every scenario considered for tackling climate change issues, along with security of supply positions the nuclear energy as a recommended option, an option that is highly competitive with respect to others. Nuclear energy, along with other renewable power sources are considered to be the main pillars in the energy sector for greenhouse gas emission mitigation at European level. European Union considers that nuclear energy must be treated as a highly recommended option since it can contribute to security of energy supply. Romania showed excellent track-records in operating in a safe and economically sound manner of Cernavoda NPP Units 1&2. Both Units are in top 10 worldwide in terms of capacity factor. Due to Romania's need to ensure the security of electricity supply, to meet the environmental targets and to move to low carbon generation technologies, Cernavoda Units 3&4 Project appears as a must. This Project was started in 2010 and it is expected to have the Units running by 2025. Cost effective and safety operation of a Nuclear Power Plant is made taking into consideration functional limits of its equipment. As common practice, every nuclear reactor type (technology used is tested according to the worse credible accident or equipment failure that can occur. For CANDU type reactor, this is a Loss of Cooling Accident (LOCA. In a LOCA type accident in a CANDU NPP, using RELAP/SCDAP code for fuel bundle damage assessment the radioactive nuclei are to be quantified. Recently, CANDU type NPP accidents are studied using the RELAP/SCDAP code only. The code formerly developed for PWR type reactors was adapted for the CANDU geometry and can assess the

  15. Cuba: Juragua NPP. Project Control. Annex 5

    International Nuclear Information System (INIS)

    Serradet, M.A.

    1999-01-01

    This annex deals with project control. The long suspension of Juragua NPP has affected personnel, equipment and site structures. Efforts are being made to revive the plant and to protect existing resources (assets). An action plan has been prepared. (author)

  16. Decommissioning of NPP A-1

    International Nuclear Information System (INIS)

    Anon

    2009-01-01

    In this presentation the Operation history of A1 NPP, Project 'Decommissioning of A1 NPP' - I stage, Project 'Decommissioning of A1 NPP ' - II stage and Next stages of Project 'Decommissioning of A1 NPP ' are discussed.

  17. Assessment of stability of the response versus scan angle for the S-NPP VIIRS reflective solar bands using pseudo-invariant desert and Dome C sites

    Science.gov (United States)

    Wu, Aisheng; Xiong, Xiaoxiong J.; Cao, Changyong

    2017-09-01

    The Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi NPP (National Polar-orbiting Partnership) satellite has been in operation for over five years. VIIRS has 22 bands with a spectral range from 0.4 μm to 2.2 μm for the reflective solar bands (RSB). The Earth view swath covers a distance of 3000 km over scan angles of +/- 56.0° off nadir. The on-board calibration of the RSB relies on a solar diffuser (SD) located at a fixed scan angle and a solar diffuser stability monitor (SDSM). The response versus scan angle (RVS) was characterized prelaunch in ambient conditions and is currently used to determine the on-orbit response for all scan angles relative to the SD scan angle. Since the RVS is vitally important to the quality of calibrated level 1B products, it is important to monitor its on-orbit stability, particularly at the short wavelengths (blue) where the most degradation occurs. In this study, the RVS stability is examined based on reflectance trends collected at various scan angles over the selected pseudo-invariant desert sites in Northern Africa and the Dome C snow site in Antarctica. These trends are corrected by the site dependent BRDF (bi-directional reflectance function) model to reduce seasonally related fluctuations. The BRDF corrected trends are examined so any systematic drifts in the scan angle direction would indicate a potential change in RVS. The results of this study provide useful information on VIIRS RVS on-orbit stability performance.

  18. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2015-09-01

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  19. Mochovce NPP simulator

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Mochovce NPP simulator basic features and detailed description of its characteristics are presented with its performance, certification and application for training of NPP operators as well as the training scenario

  20. Grohnde. Documentation of the police operation during the demonstration against the NPP Grohnde on 19.03.1977 and the evacuation of the occupied cooling tower site on 23.08.1977

    International Nuclear Information System (INIS)

    Stricker, Michael

    2014-01-01

    The documentation of the police operation during the demonstration against the NPP Grohnde on 16.03.1977 and the evacuation of the occupied cooling tower site on 23.08.1977 covers the following issues: involved action forces: police Niedersachsen, police Nordrhein-Westfalen, police Schleswig-Holstein, police Bremen and the Bundesgrenzschutz; concept of the police operation, provisions (lodging and board) for the police, operating resources, details of the operation sequence; post-processing of the operation; the Grohnde trials.

  1. Assessment of seismic hazard for NPP sites in France analysis of several aftershocks of November 8, 1983, Liege earthquake

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Mohammadioun, G.; Bresson, A.

    1984-03-01

    Current French practice for assessing seismic hazard on the sites of nuclear facilities is outlined. The procedure calls for as rich and varied an assortment of actual earthquake recordings as can be procured, including earthquakes in France itself and in nearby countries, recorded by the CEA/IPSN's own staff. Following the November 8, 1983, Liege earthquake, suitably equipped, temporary recording stations were set up in the epicentral area in order to record its aftershocks. Ground motion time histories and response spectra were computed for several of these, and a quality factor Q was derived from these data for the most superficial sedimentary layers of the area. The values obtained show reasonable agreement with ones found for similar materials in other regions

  2. Bases of updating of nuclear safety regulations for NPP in Romania

    International Nuclear Information System (INIS)

    Biro, Lucian; Serbanescu, Dan

    1999-01-01

    The paper presents the basic principles of reviewing and updating process of the regulatory environment pyramid. The main part of this review process refers to Cernavoda NPP Unit 2. However, there is an important impact on Cernavoda NPP Unit 1. The basic principles were defined in 1993/1994 when the licensing process for Unit 1 was resumed in order to be in accordance with the latest developments of Candu 600 worldwide and with the IAEA and NEA latest recommended documents and practices. After the licensing process for the Unit 1 was completed up to operation stage, CNCAN developed new updated regulations on nuclear safety and the regulatory pyramid in the framework of the RAMG PHARE project. CNCAN issued in 1996 the regulatory Policy for Unit 2, self-sustained and independent of future possible revisions of the regulations. The use of the concept of hierarchical systems, systematic review of safety criteria and objectives and margins along with the feedback from international and national experience on this topic ensured issuance of a reference document for future approach of nuclear safety in Romania. (authors)

  3. Radionuclide localization at the Chernobyl' NPP territory

    International Nuclear Information System (INIS)

    Mamaev, L.A.; Galkin, G.A.; Khrabrov, S.L.; Polyakov, A.S.; Mikhejkin, S.V.

    1989-01-01

    Experience is generalized of using different dust suppression (DS) compounds during Chernobyl' accident consequence elimination. Polymer DS compounds were used at the NPP operating site; the compounds kept dust-like radioactive contaminations during 1-2 months. DS at the country was realized by means of the compound on base of latex. The conclusion is made that the DS measures improved radiation situation in the NPP zone. 7 refs

  4. Radioactive waste management at nuclear power plant Cernavoda

    International Nuclear Information System (INIS)

    Raducea, D.

    2002-01-01

    Many human activities generate waste, but people are worried about wastes produced in nuclear power plants (NPPs). Their concern is an unjustified fear toward the hazards from radioactive waste, probably because in any country generating electric power by NPPs a lot of attention is paid to relevant parties involved in radioactive waste management. Significant attention is also given to the management of radioactive waste at the Cemavoda NPP. The general approach required for the collection, handling, conditioning and storage of radioactive wastes, while maintaining acceptable levels of safety for workers, members of the public and the environment, is conceptually established. The overall programme provides the necessary facilities to adequately manage solid radioactive waste from Cemavoda NPP Unit 1 and will be capable of expansion when other units are brought into service. (author)

  5. Welding facilities for NPP assembling

    International Nuclear Information System (INIS)

    Rojtenberg, S.S.

    1987-01-01

    Recommendations concerning the choice of equipment for welding in pre-assembling work shops, in the enlarging assembling shops and at the assembling site, are given. Advanced production automatic welders and semiautomatic machines, applied during the NPP equipment assembling as well as automatic machines specially produced for welding the main reactor components and pipelines are described. Automatic and semiautomatic machine and manual welding post supply sources are considered

  6. Decommissioning of Brennilis NPP

    International Nuclear Information System (INIS)

    Baize, Jean-Marc

    1998-01-01

    This EDF press communique give information related to the decommissioning of the Brennilis NPP. The following five items are developed in this report: 1. the level-2 decommissioning operations at the Brennilis NPP; 2. the Brennilis NPP, a pilot operation from the commissioning up to the decommissioning; 3. history of the Brennilis NPP decommissioning; 4. the types of radioactive wastes generated by the Brennilis NPP decommissioning; 5. the Brennilis NPP - a yard management as a function of the wastes. The document contains also seven appendices addressing the following subjects: 1. the share of decommissioning assigned to EDF and the decommissioning steps; 2. the EDF installations in course of decommissioning; 3. the CEA decommissioned installations or in course of decommissioning; 4. regulations; 5. costs; 6. waste management - principles; 7. data on the decommissioning yard

  7. Comparison of phototoxic effects of pregnant rats exposure in Chernobyl NPP site and external prolonged exposure in the dose of 0.5 Gy

    International Nuclear Information System (INIS)

    Grigor'eva, E.E.; Rogov, Yu.I.

    2007-01-01

    The morphometric study showed that within the 10-kilometre zone of the Chernobyl NPP delay of the rat fetus cerebral cortex maturation occurred, whereas used in the experiment prolonged low-dose irradiation did not cause essential disorders of cortical ontogenesis.(authors)

  8. NPP life management (abstracts)

    International Nuclear Information System (INIS)

    Litvinskij, L.L.; Barbashev, S.V.

    2002-01-01

    Abstracts of the papers presented at the International conference of the Ukrainian Nuclear Society 'NPP Life Management'. The following problems are considered: modernization of the NPP; NPP life management; waste and spent nuclear fuel management; decommissioning issues; control systems (including radiation and ecological control systems); information and control systems; legal and regulatory framework. State nuclear regulatory control; PR in nuclear power; training of personnel; economics of nuclear power engineering

  9. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  10. Main principles of NPP project ecological expert investigation

    International Nuclear Information System (INIS)

    Dibobes, I.K.; Revina, S.K.; Glushkov, V.P.

    1983-01-01

    NPP project ecological expert investigation among the other objectives is to provide implementation of standards, rules and requirements as well as government decrees and international obligations of the USSR concerning the environment protection. The expert investigation takes into consideration both environment protection, regional, resources, ecological, demographic and economic aspects. The NPP siting and the local environment and resources state are estimated as well as the structure of utilization of the latter, the expected damage to the environment due to NPP construction and the measures directed towards the optimal using of natural resources. On the basis of the presented issues suggestions about NPP projects coordination with Goskomgidromet's institutions are given [ru

  11. Engineering geological and hydrogeological invstigations for storage of medium and low-activity nuclear waste at Cernavoda, Romania. Soil stabilisation using the CONSOLID system; Ingenieurgeologische und hydrogeologische Untersuchungen zur Lagerung mittel- und schwachradioaktiver Abfaelle in Cernavoda Rumaenien. Baugrundstabilisierung mit dem CONSOLID-System

    Energy Technology Data Exchange (ETDEWEB)

    Giurgea, V.; Merkler, G.P.; Hoetzl, H.; Hannich, D. [Karlsruhe Univ. (T.H.) (Germany). Lehrstuhl fuer Angewandte Geologie

    1998-12-31

    In Cernavoda/Romania investigations and planning from a low and middle radioactive waste disposal site have been carried out. A multitude of hydrogeological, geological, engineering geological criteria`s and constructional security measures were examined with respect to the strict regulations for such a waste site. This studies and measures are shortly analyzed and discussed in this paper. In accordance with the selection criteria for such a hazardous waste site, several laboratory and `in situ` tests, soil-mechanic studies, numerical modeling and foundation tests for soil stabilization with the CONSOLID-System are presented. (orig.) [Deutsch] Zur Einhaltung der strengen Vorgaben, die bei einem Deponiestandort fuer mittel- und schwachradioaktive Abfaelle gestellt werden, sind in Cernavoda/Rumaenien eine Vielzahl von hydrogeologischen und ingenieurgeologischen Untersuchungen sowie bautechnischen Sicherungsmassnahmen vorgesehen, die im Rahmen dieser Publikation kurz analysiert und diskutiert werden. Im Zusammenhang mit den geologischen und hydrogeologischen Auswahlkriterien des Standortes werden eine Reihe von Labor- und `in situ` Untersuchungen, Modellrechnungen sowie Baugrundstabilisierungsmassnahmen mit dem CONSOLID-System vorgestellt. (orig.)

  12. An assessment of the fire protection requirements throughout a NPP life related to current IAEA regulations and American, Canadian and UE regulations

    International Nuclear Information System (INIS)

    Branzeu, N.; Necula, D.; Badea, M.; Teodorescu, D.; Peteu, M.

    2006-01-01

    Statistics on fires has surprisingly shown that the frequency of fires in a nuclear power plant are as high as in the conventional industrial units. The analyses on fires occurred in a NPP need to consider both their well-known severe damages and the nuclear consequences. In 1975 a severe fire occurred in BROWNS FERRY NPP due to the ignition of the polyurethane foam used in the electric cable penetration sealings. The fire propagated to the cable channels and damaged over 1600 cables. The fire event revealed important shortcomings in the fire protection design and procedures. The fire represented a crucial event that changed fundamentally the fire protection regulation in the United States nuclear industry. The fire protection programs, standards and guides currently applied, have been developed on basis of this fire analysis and gained conclusions/experience. The purpose of the article is to be a short presentation of the fire protection requirements for all NPP life stages (i.e. design, construction, commissioning, operation and decommissioning), including the most recent issues of the standards, codes, guides and regulations in US, Canada, IAEA and some European countries. Such documentation represented the main technical support in establishing the national fire protection standard design regarding all the stages of a CANDU-6 NPP life, all the types of operational NPPs, particularly for Cernavoda NPP Unit 1 and Unit 2 (now in an advanced stage of construction). In order to satisfy the requirements provided by this documentation, as practically as possible, a list of analyses and fire protection improvement measures for Cernavoda NPP is presented. (authors)

  13. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  14. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  15. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  16. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  17. Optimal test intervals for shutdown systems for the Cernavoda nuclear power station

    International Nuclear Information System (INIS)

    Negut, Gh.; Laslau, F.

    1993-01-01

    Cernavoda nuclear power station required a complete PSA study. As a part of this study, an important goal to enhance the effectiveness of the plant operation is to establish optimal test intervals for the important engineering safety systems. The paper presents, briefly, the current methods to optimize the test intervals. For this reason it was used Vesely methods to establish optimal test intervals and Frantic code to survey the influence of the test intervals on system availability. The applications were done on the Shutdown System no. 1, a shutdown system provided whit solid rods and on Shutdown System no. 2 provided with injecting poison. The shutdown systems receive nine total independent scram signals that dictate the test interval. Fault trees for the both safety systems were developed. For the fault tree solutions an original code developed in our Institute was used. The results, intended to be implemented in the technical specifications for test and operation of Cernavoda NPS are presented

  18. A dose assessment for final low level waste disposal located at Cernavoda

    International Nuclear Information System (INIS)

    Moldoveanu, E.

    1995-01-01

    This paper presents the first step in the radiological effect evaluation of the low radioactive wastes disposal which will be located in Cernavoda's area. The calculations are done with some approximations based on pessimistic hypotheses. In this sense, the primary step of the accident scenario is a total failure of the wastes disposal and a total emission of radioactive wastes in the environment. The results are estimated versus the time in which radioisotopes migrate through geological formations until they arrive at the underground water. It is considered that for Cernavoda, a town situated in the vicinity of the disposal, the water is contaminated with all radioisotopes arising in this way, and people ingest this water (2 l/day). The results are presented in tables and figures. (author)

  19. Moving the largest capacity PWR dual-purpose cask in the world from Goesgen NPP to the Zwilag interim storage site

    International Nuclear Information System (INIS)

    Delannay, M.; Dudragne, S.

    2002-01-01

    The Swiss Goesgen nuclear power plant (NPP) has decided to use two different methods for the disposal of its spent fuel. (1) To reprocess some of its spent fuel in dedicated facilities. Some of the vitrified waste from the reprocessing will be shipped back to Switzerland using the new COGEMA Logistics, TN81 cask. (2) To ship the other part of its spent fuel to the central interim storage facility of Zwilag (Switzerland) using a COGEMA Logistics dual-purpose TN24G cask. The TN24G is the heaviest and largest dual-purpose cask manufactured so far by COGEMA Logistics in Europe. It is intended for the transport and storage of 37 pressurised water-reactor (PWR) spent fuel assemblies. Four casks were delivered by COGEMA Logistics to Goesgen NPP. Three transports of loaded TN24G casks between Goesgen and Zwilag were successfully performed at the beginning of 2002 with the new COGEMA Logistics Q76 wagon specifically designed to transport heavy casks. This article describes the procedure of operations and shipments for the first TN24G casks up to storage at Zwilag. The fourth transport of loaded TN24G was due to happen in October 2002. The TN24G cask, as part of the TN24 casks family, proved to be a very efficient solution for the KKG spent fuel management. (author)

  20. Regulatory approach to NPP ageing in Romania

    International Nuclear Information System (INIS)

    Benescu, C.G.; Hossu, A.

    2000-01-01

    In this paper the Romanian requirements for ageing management of systems and components important to safety of Cernavoda nuclear power plant (one Candu type reactor, heavy water moderated power reactor) are presented

  1. External hazards considered for Paks NPP

    International Nuclear Information System (INIS)

    Kiss, Tibor

    2000-01-01

    PAKS NPP was built according to Soviet construction standards which took into account meteorological aspects but no documents for other external hazards were available. Main activities concerning earthquakes cover reevaluation of the plant site, seismic safety technological concept, improving the seismic resistance, installation of seismic monitoring and protection system, and seismic PSA

  2. Slovakia: Mochovce NPP. Project control. Annex 10

    International Nuclear Information System (INIS)

    Bodorik, K.

    1999-01-01

    This annex deals with project control. Mochovce NPP suffered considerable delay primarily due to lack of money. This situation was corrected and construction resumed in 1996. Throughout the 'dormant' period the plant received considerable support from the major contractors, who maintained skeleton staff at site. Significant safety and managerial improvements are being introduced and a strategic plan for the plant has been developed. (author)

  3. Gamma irradiation tests of concrete material recommended for storage casks of spent nuclear fuel arising from Cernavoda NPP

    International Nuclear Information System (INIS)

    Dulama, M.; Deneanu, N.; Dulama, C.; Baboescu, E.

    2001-01-01

    Considerable effort is being devoted to the Romania's Nuclear Spent Fuel and Waste Management R and D Program to develop engineered barriers for the containment of nuclear fuel waste under conditions of deep geological disposal. Engineering practice suggests that the concrete should fulfil the requirements of long term physical stability and resistance to radiation. With an appropriate system of metal reinforcement, it should be possible to obtain the tensile and impact strength required, avoiding the risk of mechanical damage during handling and emplacement. In accordance with the concept developed by CITON-Bucharest, presently, the dry storage of spent nuclear fuel is thought by two choices: - The alternative of dry storage type MMB3; - The alternative of dry storage type TRANSTOR. By using ORIGEN and PELSHIE computer codes, we evaluated the gamma radiation dose absorbed by the concrete walls of the storage vault both in MMB3 and in TRANSTOR designing variants. The irradiation tests were performed at the Gamma Irradiation Facility of the Institute for Nuclear Research. (authors)

  4. Thermal-hydraulic analyses of the recirculated cooling water from cernavoda n.p.p. unit 1

    International Nuclear Information System (INIS)

    Pancef, R.; Anghel, N.; Nita, I. P.

    2013-01-01

    The paper presents the results from a very complex and large analysis performed for the Recirculated Cooling Water System. The analysis was required in order to increase the flow rate for moderator heat exchangers and introduction of a new consumer: urban heating. The system capability to supply with cooling agent all this consumers at all operating regimes from the design manual of the system had to be checked. One concluded that the required modification to the system had no influence in operating the system in all operating condition but there is an issue is regarding the necessity to recalculate the heat load from the moderator heater. The analysis was calibrated by using measurements from the plant, which have been obtained with ultrasonic flowmeters and local indicators. The analysis concludes that the system can change the requirements to the moderator heat exchangers and a new turbine building consumer (urban heating) can be introduced. (authors)

  5. Knowledge management during decommissioning of Chornobyl NPP

    International Nuclear Information System (INIS)

    Gora, A.D.; Kuchinskij, V.K.; Stel'makh, D.A.; Tsivun, T.A.

    2010-01-01

    The article deals with issues on knowledge management during decommissioning by the example of the Chornobyl NPP. This includes how the duration of decommissioning stage, change in organization goal and final state of the site influence on human resources and knowledge management system. The main attention is focused on human assets and intellectual strength of Chornobyl NPP. Mathematical dependencies are proposed to substantiate numerical values. An analysis is given for the current situation, and forecast estimates for values dynamics is performed. The conclusion gives solutions on providing experienced staff in the future.

  6. Safeguards at Kozloduy NPP - Experience and expectations

    International Nuclear Information System (INIS)

    Elenkov, Todor

    2001-01-01

    Bulgaria is a party of Non Proliferation Treaty since 5 September 1969. The agreement between IAEA and Bulgaria - INFCIRC 178 - has been in force since 29 February 1972. At that time Bulgaria had one research reactor IRT-2000 in Sofia and two power reactors of WWER-440 type under construction. Now at Kozloduy NPP site there are 4 facilities, which consist of 4 WWER-440 and 2 WWER-1000 type power reactors, producing almost 50% of the electricity in Bulgaria and 1 wet away from reactor spent fuel storage. In 1991 under the green movements and social pressure, the research reactor in Sofia was closed and the construction of the second NPP in Belene with 2 WWER-1000 type reactors was halted. After the transfer in 1994 of the fresh fuel from the research reactor to Kozloduy due to security reasons practically NPP Kozloduy remains the only significant (from safeguards point of view) nuclear site in Bulgaria. In 1972 a 'Nuclear Fuel' group was formed at the Physicists Department in NPP Kozloduy with responsibilities to carry out for safeguards records and reports, fresh and spent fuel transport and control. In 1990 this group was transferred to the Safety Section and since 1992 it exists as 'Control and Accounting for of the Nuclear Materials' - a section in the Safety Department. Currently the section serves all four facilities in NPP Kozloduy and has four people: section head, chief inspector and two inspectors. The main activities of the section include: a) Control of the nuclear fuel location as well as meeting the storage and transport conditions regulations; b) Control of the conditions for normal operations of the installed IAEA surveillance systems; c) Preparation of documents for licensing of fresh and spent nuclear fuel transport; d) Preparation of the official information on nuclear materials location and quantity; e) Preparation of accounting records and the reports for IAEA (ICR, PIL, MBR); f) Co-ordination of the IAEA safeguards inspection activities at NPP

  7. Reactor plant for Belene NPP completion

    International Nuclear Information System (INIS)

    Dragunov, Yu. G.; Ryzhov, S. B.; Ermakov, D. N.; Repin, A. I.

    2004-01-01

    Construction of 'Belene' NPP was started at the end of 80-ties using project U-87 with V-320 reactor plant, general designer of this plant is OKB 'Gidropress'. At the beginning of 90-ties, on completing the considerable number of deliveries and performance of civil engineering work at the site the NPP construction was suspended. Nowadays, considering the state of affairs at the site and the work performed by Bulgarian Party on preservation of the equipment delivered, the most perspective is supposed to be implementation of the following versions in completing 'Belene' NPP: for completion of Unit 1 - reactor plant VVER-1000 on the basis of V-320 reactor with the maximum use of the delivered equipment (V-320M) having the extended service life and safety improvement; for Unit 2 - advanced reactor plant VVER-1000. For the upgraded reactor plant V-230M the basic solutions and characteristics are presented, as well as the calculated justification of strength and safety analyses, design of the reactor core and fuel cycle, instrumentation and control systems, application of the 'leak-before break' in the project and implementation of safety measures. For the modernised reactor plant V-392M the main characteristics and basic changes are presented, concerning reactor pressure vessel, steam generator, reactor coolant pump set. Design of NPP with the modernized reactor plant V-320M meets the up-to-date requirements and can be licensed for completion and operation. In the design of NPP with the advanced reactor plant the basic solutions and the equipment are used that are similar to those used in standard reactor plant V-320 and new one with VVER-1000 under construction and completion in Russia, and abroad. Compliance of reactor design with the up-to-date international requirements, considering the extended service life of the main equipment, shows its rather high potential for implementation during completion of 'Belene' NPP

  8. The dependence level analysis between the human actions in NPP Operation

    International Nuclear Information System (INIS)

    Farcasiu, M.; Nitoi, M.; Apostol, M.; Florescu, G.; Prisecaru, Ilie

    2009-01-01

    The Human Reliability Analysis (HRA) is an important method in Probabilistic Safety Assessment (PSA) studies and offers desirability for concrete improvement of the man - machine - organization interfaces, reliability and safety. An important step in HRA is the dependence level analysis between the human actions performed by the same person or between the actions performed by different persons, step in quantitative analysis of the human errors probabilities. The purpose of this paper is to develop a model to analyze the dependence level between human actions for Nuclear Power Plant (NPP) operation. The model estimates the conditional human error probabilities (CHEP) and joint human error probabilities (JHEP). The achieved sensitivity analyses determine human performance sensibility to systematic variations for dependence level between human actions. The human error probabilities estimated in this paper are adequate values for integration both in HRA and in PSA realized for NPP. This type of analysis helps in finding and analyzing the ways of reducing the likelihood of human errors, so that the impact of human factor to systems availability, reliability and safety can be realistically estimated. In order to demonstrate the usability of this model an analysis is performed upon the dependences between the necessary human actions in mitigating the consequences of LOCA events, particularly for the case of Cernavoda NPP. (authors)

  9. The experience in the Cernavoda Unit 1 operation - a stimulating argument for future nuclear power development in Romania

    International Nuclear Information System (INIS)

    Rotaru, I.; Bucur, I.; Galeriu, A.C.; Budan, O.

    1999-01-01

    The Romanian nuclear program has been developed based on the option for CANDU type reactors. At the beginning, this program was unrealistically conceived and its management was inappropriate. The program was reconsidered in 1990 and the management policy and organization structure were also adapted accordingly. The paper presents, in the first part, the actual organization structure, adapted for the execution of the current and future activities, related to the nuclear power program. The performance achieved by Cernavoda Unit 1 constitutes the main part of the paper. The performances described demonstrate that the Cernavoda Unit 1 is a success and the Romania's electricity needs are satisfied in a proportion of about 12% by the nuclear power. The paper also presents a general view on Cernavoda Unit 2 perspectives. The essential conclusion of the paper is that the continuation of the nuclear program appears to be a logical option, generally accepted in Romania, limited only by financial restraints. (author)

  10. EMAS at Doel NPP

    International Nuclear Information System (INIS)

    Nolan, Peter; Thoelen, Els

    1998-01-01

    In October 1995, Doel NPP of Electrabel, Belgium opted to seek registration under the EC Eco-management and Audit Scheme (EMAS). A comprehensive environmental management system (EMS) has been introduced and implemented, encompassing all four PWRs and the supporting departments. A critical step was to seek certification from an accredited environmental auditing body against the International Standard ISO 14001. This provided the foundation for the publicly available environmental statement required by EMAS. The complications of achieving EMAS at a time when national and international standards were being re-formulated were successfully overcome and Doel NPP passed its EMAS audit in June 1997. (author)

  11. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 1. Data related to sites and plants: Paks NPP, Kozloduy NPP. Working material

    International Nuclear Information System (INIS)

    1995-01-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on data related to sites and NPPs Paks and Kozloduy

  12. Co-ordinated research programme on benchmark study for the seismic analysis and testing of WWER-type nuclear power plants. V. 1. Data related to sites and plants: Paks NPP, Kozloduy NPP. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Co-ordinated research programme on the benchmark study for the seismic analysis and testing of WWER-type nuclear power plants was initiated subsequent to the request from representatives of Member States. The conclusions adopted at the Technical Committee Meeting on Seismic Issues related to existing nuclear power plants held in Tokyo in 1991 called for the harmonization of methods and criteria used in Member States in issues related to seismic safety. The Consulltants' Meeting which followed resulted in producing a working document for CRP. It was decided that a benchmark study is the most effective way to achieve the principal objective. Two types of WWER reactors (WWER-440/213 and WWER-1000) were selected as prototypes for the benchmark exercise to be tested on a full scale using explosions and/or vibration generators. The two prototypes are Kozloduy Units 5/6 for WWER-1000 and Paks for WWER-440/213 nuclear power plants. This volume of Working material contains reports on data related to sites and NPPs Paks and Kozloduy.

  13. Modernization and safety improvement project of the NPP V-2 Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Michal, V.; Losonsky, B.; Magdolen, J.

    2000-01-01

    This contribution deals with the form, present state, and results of the Nuclear Power Plants Research Institute (the Slovak acronym is VUJE - Vyskumny Ustav Jadrovych Elektrarni) participation in the NPP V-2 Jaslovske Bohunice Modernization and Safety Improvement Project. A short description of VUJE history, activity, and results is also presented as well as NPPs Jaslovske Bohunice characterization. VUJE was established in 1977 and deals with scientific and research needs of nuclear power plants, such as design, construction, commissioning and operation. The next fields of VUJE activity are, NPP reconstruction, NPP personnel training, radioactive waste management technology, and NPP decommissioning. The nuclear power plant, Jaslovske Bohunice, is situated approximately 15 km from the district town of Trnava in the southwestern region of the Slovak Republic. The construction of the first Czechoslovak NPP A-1 began on this site in 1957 .The construction of the double-unit NPP V-1 with WWER-440 (type V-230) reactor began in 1972. The first unit of NPP V-1 began operation in 1978 and the second in 1980. NPPs construction on the Bohunice site continued with NPP V-2, which has two units with WWER-440 (type V-213) reactors. Unit 1 and Unit 2 of NPP V-2 were commissioned in 1984 and 1985, respectively. Slovak electric utility Slovenske elektrarne (SE) is the owner/commissioner of NPP V-2. This NPP is responsible for more than 20% of the total electrical energy production of SE, making it an essential supporter of the Slovak economy. (authors)

  14. An Investigation of a Novel Cross-Calibration Method of FY-3C/VIRR against NPP/VIIRS in the Dunhuang Test Site

    Directory of Open Access Journals (Sweden)

    Caixia Gao

    2016-01-01

    Full Text Available Radiometric cross-calibration of Earth observation sensors is an effective approach to evaluate instrument calibration performance, identify and diagnose calibration anomalies, and quantify the consistency of measurements from different sensors. In this study a novel cross-calibration method is proposed, taking into account the spectral and viewing angle differences adequately; the method is applied to the FY-3C/Visible Infrared Radiometer (VIRR, taking the Suomi National Polar-Orbiting Partnership (NPP/Visible Infrared Imaging Radiometer Suite (VIIRS as a reference. The results show that the relative difference between the two sets increases from January to May 2014, and becomes lower for the data on 24 July, 11 September, and 16 September, within approximately 10%. This phenomenon is caused by the updating of the calibration coefficients in the VIRR datasets with results from a vicarious method on June 2014. After performing an approximate estimation of the uncertainty, it is demonstrated that this calibration has a total uncertainty of 5.5%–6.0%, which is mainly from the uncertainty of the Bidirectional Reflectance Distribution Function model.

  15. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  16. Transfer time estimation of 129I, 99Tc and 14C in the geological layers of the Saligny site

    International Nuclear Information System (INIS)

    Dogaru, Daniela; Niculae, Ortenzia; Terente, M.; Jinescu, Gh.; Duliu, O.G.

    2009-01-01

    The paper describes the assessment of transfer time of 129 I, 99 Tc and 14 C in the geological layers of Saligny site, selected as Near Surface Final Repository for short-lived low and intermediate level radioactive waste generated by the operation and decommissioning of the four units of Cernavoda NPP equipped with the CANDU-6 Canadian type reactors. The geological aspects of Saligny site are presented for which the transfer time of radio-nuclides is necessary to assess. The conceptual model of the repository as well as the associated mathematical model which describes the transfer of radio-nuclides from radioactive waste disposal system to aquifer is also presented in the paper. The transfer time of these radionuclides is derived from the time difference when a radionuclide reaches the highest peak value of concentration into two adjacent compartments. The transfer time is compared with the half-life of radio-nuclides in order to asses the role of geological layers of the site in delaying the transfer of radio-nuclides. The evaluation was performed using the AMBER computing code. also a comparison with results from HYDRUS computer code is done. (authors)

  17. Temelin NPP commissioning experiences

    International Nuclear Information System (INIS)

    Hanus, V.

    2002-01-01

    The Building Permit for the Temelin NPP with four VVER units was issued in 1986, which is a long time ago. Since then, however, was taken a route that is very different from what anybody imagined. Described are the legislative and design changes and given is a current condition of the power plant

  18. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  19. Two managerial grids in NPP

    International Nuclear Information System (INIS)

    Zhao Hui

    2012-01-01

    Today, the nuclear power corporation (NPC) enjoys the profit of LCEP (the low carbon economic policy). at the same time, they also enduring more and more pressure. For example, the partner competition or the NPP potential occupational risk . The efficient counterplot of risk is the self-ability cultivation. It is essential to research the NPP managerial flow. The nuclear power plant (NPP) unit is a carrier of the NPC enterprise management system, and has taken on a new look 'pull one portion then the whole moving'. The NPP has three systematical characters, the security responsibility center, the man-machine system and the input-output system. The manufacturing system and the enterprise management system are the great constituents of the NPP managerial flows. Means of systems analysis, we can find out the truth of the NPP running interface. In CHINA, there are many operating experiences near 20 years. It indicates that the NPP manufacturing system and the enterprise system are the roots of the nuclear power corporation, the core of the all NPP systems must be based on it. So the ability cultivation is the work core to NPP. It is reliably to ensure the NPP to be up against problems, for instance, the security duty, the costing control and the man-machine system running harmoniously. This paper introduces the NPP managerial flow and the present state of QNPC, also come up with a proposal to refer for the NPC development actions of collective measure, specialization, standardization, fine. (author)

  20. Site characterization techniques used in restoration of agricultural areas on the territory of the Russian Federation contaminated after the accident at the Chernobyl NPP

    International Nuclear Information System (INIS)

    Fesenko, S.V.; Alexakhin, R.M.; Sanzharova, N.I.

    2000-01-01

    The experience gained in the aftermath after the heavy radiation accidents shows the need for improvement in site characterisation techniques and methodology in order to provide a link between site characterisation and the selection of restoration strategies. This paper gives an overview of the site characterisation techniques used in restoration of contaminated agricultural lands on the territory of the Russian Federation. The approach used for site characterisation and selection of restoration strategies is described. The main site specific factors influencing the choice of restoration options are identified. Data on the efficiency of major restoration measures used for the remediation of agricultural lands after the Chernobyl Nuclear Power Plant and the Kyshtym accidents are given. A description of the decision support system FORCON, designed to simplify the selection of restoration options, is presented. (author)

  1. Supercompaction of radioactive waste at NPP Krsko

    International Nuclear Information System (INIS)

    Fink, K.; Sirola, P.

    1996-01-01

    The problem of radioactive waste management is both scientifically and technically complex and also deeply emotional issue. In the last twenty years the first two aspects have been mostly resolved up to the point of safe implementation. In the Republic of Slovenia, certain fundamentalist approaches in politics and the use of radioactive waste problem as a political tool, brought the final radioactive repository siting effort to a stop. Although small amounts of radioactive waste are produced in research institutes, hospitals and industry, major source of radioactive waste in Slovenia is the Nuclear Power Plant Krsko. When Krsko NPP was originally built, plans were made to construct a permanent radioactive waste disposal facility. This facility was supposed to be available to receive waste from the plant long before the on site storage facility was full. However, the permanent disposal facility is not yet available, and it became necessary to retain the wastes produced at the plant in the on-site storage facility for an extended period of time. Temporary radioactive storage capacity at the plant site has limited capacity and having no other options available NPP Krsko is undertaking major efforts to reduce waste volume generated to allow normal operation. This article describes the Radioactive Waste Compaction Campaign performed from November, 1994 through November, 1995 at Krsko NPP, to enhance the efficiency and safety of storage of radioactive waste. The campaign involved the retrieval, segmented gamma-spectrum measurement, dose rate measurement, compaction, re-packaging, and systematic storage of radioactive wastes which had been stored in the NPP radioactive waste storage building since plant commissioning. (author)

  2. Use of reconnaissance level information for environmental assessment. [Information available from existing sources that satisfies information needs of siting and operational aspects of NPP

    Energy Technology Data Exchange (ETDEWEB)

    Foster, R.F.; Rickard, W.H.; Strand, J.A.; Warner, M.L.

    1979-11-01

    Reconnaissance level information (RLI) sufficient for comparing the environmental and socio-economic features of candidate sites for nuclear power stations and for guiding plant design, baseline surveys, and operational practices is usually available from published reports, public records, and knowledgeable individuals. Environmental concerns of special importance for site evaluation include: aquatic ecology, terrestrial ecology, land and water use, socio-economics, and institutional constraints. A scheme is suggested for using RLI to assign classifications to candidate sites based on the potential level of concern associated with the different environmental features.

  3. Conceptual design of covering method for the proposed LILW near-surface repository at Cernavoda

    International Nuclear Information System (INIS)

    Diaconu, Daniela

    2003-01-01

    The disposal concept of the low and intermediate level (LIL) wastes resulting during NPP operation combines both the natural and engineered barriers in order to ensure the safety of the environment and population. Saligny site has been proposed for LIL waste disposal. Preliminary performance assessments indicate that the loess and clay layers are efficient natural barriers against water flow and radionuclide migration through the vadose zone to the local aquifers. At present, the studies on site characterization are concentrated on investigation of the potential factors affecting the long-term integrity of the disposal facility. This analysis showed that surface erosion by wind and water and bio-intrusion by plant roots and burrowing animals could affect the long-term disposal safety. Based on the preliminary erosion results, as well as on the high probability of bio-intrusion by the plant roots and burrowing animals (i.e. moles, mice), different covering systems able to ensure the long-term safety of the repository has been proposed and analyzed. FEHM and HYDRUS 2D water flow simulations have been performed in order to compare their efficiency in the diminution of the infiltration rate in the repository. From this point of view, the covering system combining the capillary barrier and the resistive layer proved to have the best behavior

  4. The regulatory requirements, design bases, researches and assessments in the field of Ukrainian NPP's seismic safety

    International Nuclear Information System (INIS)

    Mykolaychuk, O.; Mayboroda, O.; Krytskyy, V.; Karnaukhov, O.

    2001-01-01

    State Nuclear Regulatory Authority of Ukraine (SNRA) pays large attention to problem of nuclear installations seismic stability. As a result the seismic design regulatory guides is revised, additional seismic researches of NPP sites are conducted, seismic reassessment of NPP designs were begun. The experts involved address all seismic related factors under close contact with the staff of NPP, design institutes and research organizations. This document takes stock on the situation and the research programs. (author)

  5. Krsko NPP radioactive waste characteristics

    International Nuclear Information System (INIS)

    Skanata, D.; Kroselj, V.; Jankovic, M.

    2007-01-01

    In May 2005 Krsko NPP initiated the Radioactive Waste Characterization Project and commissioned its realization to the consulting company Enconet International, Zagreb. The Agency for Radwaste Management was invited to participate on the Project. The Project was successfully closed out in August 2006. The main Project goal consisted of systematization the existing and gathering the missing radiological, chemical, physical, mechanical, thermal and biological information and data on radioactive waste. In a general perspective, the Project may also be considered as a part of broader scope of activities to support state efforts to find a disposal solution for radioactive waste in Slovenia. The operational low and intermediate level radioactive waste has been structured into 6 waste streams that contain evaporator concentrates and tank sludges, spent ion resins, spent filters, compressible and non-compressible waste as well as specific waste. For each of mentioned waste streams, process schemes have been developed including raw waste, treatment and conditioning technologies, waste forms, containers and waste packages. In the paper the main results of the Characterization Project will be briefly described. The results will indicate that there are 17 different types of raw waste that have been processed by applying 9 treatment/conditioning technologies. By this way 18 different waste forms have been produced and stored into 3 types of containers. Within each type of container several combinations should be distinguished. Considering all of this, there are 34 different types of waste packages altogether that are currently stored in the Solid Radwaste Storage Facility at the Krsko NPP site. Because of these findings a new identification system has been recommended and consequently the improvement of the existing database on radioactive waste has been proposed. The potential areas of further in depth characterization are indicated. In the paper a brief description on the

  6. Evaluation of specific tritium transfer parameters in equilibrium conditions for Cernavoda area

    International Nuclear Information System (INIS)

    Paunescu, N.; Galeriu, D.; Mocanu, N.; Margineanu, R.

    1998-01-01

    In Romania, a CANDU nuclear power plant with five reactors of 600 MWe is under construction. The first unit reached its criticality on April 1996 and became operational at full power on December 1996. The nuclear power plant is placed in Cernavoda area, in the S-E of Romania, between the Danube River and the Danube-Black Sea Canal. The prevalent local climate is continental and agricultural activity in the neighbourhood of the nuclear power plant is of intensive type. The routine atmospheric tritium release from the 3 GWe nuclear power plant is expected to be about 460 TBq/year and the aqueous release is expected to be 350 TBq/year. The aim of this study was to evaluate the environmental tritium reference level before commissioning the nuclear power plant. Representative samples for Cernavoda area were analysed: air humidity; water from Danube River, Danube-Black Sea Canal, lakes; drinking and ground water, rain (snow) water; soil at different depths; tissue free water tritium in vegetal and animal foodstuff relevant for human diet: cereals (wheat, maize, barley), vegetables (potato, tomato, cabbage, onion, bean), fruits, grapes, wine and milk; organically bound tritium in wheat and maize grains. The equipment and methods used were: Liquid scintillation analyzer of type TRICARB 1900 TR; scintillation cocktails of Instagel and Pico Fluor LLT type; sampling system for trapping the atmospheric tritium on molecular sieves; furnace; vacuum line and freeze trap (-60 deg. C); equipment for simple, fractionating and azeotropic distillation. The background level of tritium concentration was determined in environmental samples in Cernavoda area, in preoperational stage of nuclear power plant. The mean values determined during 1994-early 1996 are : (7.4±5.5) Bq/L in air humidity, (3.1±1.0) Bq/L in water, (3.53±0.4) Bq/L in tissue water from vegetable and (4.9±1.7) Bq/L in tissue water from cereals (grains). The values of tritium concentration in air, water, soil and

  7. Grohnde. Documentation of the police operation during the demonstration against the NPP Grohnde on 19.03.1977 and the evacuation of the occupied cooling tower site on 23.08.1977; Grohnde. Dokumentation der Polizeieinsaetze anlaesslich der Demonstration gegen das Kernkraftwerk Grohnde am 19.03.1977 und der Raeumung des besetzten Kuehlturmgelaendes am 23.08.1977

    Energy Technology Data Exchange (ETDEWEB)

    Stricker, Michael

    2014-07-01

    The documentation of the police operation during the demonstration against the NPP Grohnde on 16.03.1977 and the evacuation of the occupied cooling tower site on 23.08.1977 covers the following issues: involved action forces: police Niedersachsen, police Nordrhein-Westfalen, police Schleswig-Holstein, police Bremen and the Bundesgrenzschutz; concept of the police operation, provisions (lodging and board) for the police, operating resources, details of the operation sequence; post-processing of the operation; the Grohnde trials.

  8. The performance shaping factors influence analysis on the human reliability for NPP operation

    International Nuclear Information System (INIS)

    Farcasiu, M.; Nitoi, M.; Apostol, M.; Florescu, G.

    2008-01-01

    The Human Reliability Analysis (HRA) is an important step in Probabilistic Safety Assessment (PSA) studies and offers an advisability for concrete improvement of the man - machine - organization interfaces, reliability and safety. The goals of this analysis are to obtain sufficient details in order to understand and document all-important factors that affect human performance. The purpose of this paper is to estimate the human errors probabilities in view of the negative or positive effect of the human performance shaping factors (PSFs) for the mitigation of the initiating events which could occur in Nuclear Power Plant (NPP). Using THERP and SPAR-H methods, an analysis model of PSFs influence on the human reliability is performed. This model is applied to more important activities, that are necessary to mitigate 'one steam generator tube failure' event at Cernavoda NPP. The results are joint human error probabilities (JHEP) values estimated for the following situations: without regarding to PSFs influence; with PSFs in specific conditions; with PSFs which could have only positive influence and with PSFs which could have only negative influence. In addition, PSFs with negative influence were identified and using the DOE method, the necessary activities for changing negative influence were assigned. (authors)

  9. Dukovany NPP operation

    International Nuclear Information System (INIS)

    Vlcek, Jaroslav

    2010-01-01

    The topics discussed include: Dukovany NPP among CEZ Group power plants; International missions at the plant; Plant operation results; and Strategic goals and challenges. Historical data are presented in the graphical form, such as the unit capacity factor, unplanned capability loss factor, unplanned automatic scrams, fuel reliability, industrial safety accident rate, collective radiation exposure, WANO index, power generation data, and maximum achievable power by the end of year. Also discussed were the company culture and human resources, maintenance, power uprate, and related phenomena. (P.A.)

  10. Operation safety at Ignalina NPP

    International Nuclear Information System (INIS)

    Zheltobriukh, G.

    1999-01-01

    An improvement of operational safety at Ignalina NPP covers: improvement of management structure and safety culture; symptom-based emergency operating procedures; staff training and full scope simulator; program of components ageing; metal inspection; improvement of fire safety. The first plan of Ignalina NPP Safety culture development for 1997 purposed to the SAR recommendation implementation was prepared and approved by the General Director

  11. Preparation for Ignalina NPP decommissioning

    International Nuclear Information System (INIS)

    Medeliene, D.

    2004-01-01

    Latest developments of atomic energy in Lithuania, works done to prepare Ignalina NPP for final shutdown and decommissioning are described. Information on decommissioning program for Ignalina NPP unit 1, decommissioning method, stages and funding is presented. Other topics: radiation protection, radioactive waste management and disposal. Key facts related to nuclear energy in Lithuania are listed

  12. Assessment of the cryogenic distillation system in Cernavoda tritium removal facility

    International Nuclear Information System (INIS)

    Pasca, Gheorghe; Draghia, Mirela; Porcariu, Florina; Ana, George

    2010-01-01

    Full text: This paper aims at presenting an assessment of the Cryogenic Distillation system (CD) in the Cernavoda Tritium Removal Facility (CTRF). The cryogenic distillation system is one of the key components of the CTRF which comprises other systems as: the liquid phase catalytic exchange system, designed to transfer tritium from heavy water to a deuterium stream to be fed into the CD system; the atmosphere detritiation system; the tritium recovery system; the tritium/hydrogen monitoring system; the central interlocking system; the tritium extraction and storage system. Thus, the need to build a tritium separation and recovery system results from economic opportunities offered both by heavy water reuse and tritium production, but, at the same time, it offers an alternative for the storage of tritiated heavy water as radioactive waste. (authors)

  13. Fuel handling at Cernavoda 1 N.P.S. - commissioning and training philosophy

    Energy Technology Data Exchange (ETDEWEB)

    Standen, G W [AECL-Ansaldo Consortium, Cernavoda (Romania); Tiron, C; Marinescu, S [Regia Nationala de Electricitate (RENEL), Cernavoda (Romania); [Filiala Centrala Nuclearo Electrica (FCNE), Cernavoda (Romania)

    1997-12-31

    Efficient operation of a Candu nuclear power plant depends greatly on the reliable and safe operation of the fuel handling system. Successful commissioning of the system is obviously a key aspect of the reliability of the system and this coupled with a rigorous training programme for the fuel handling staff will ensure the system`s safe operation. This paper describes the philosophy used at Cernavoda 1 N.P.S. for the commissioning of the fuel handling systems and for the training of staff for operation and maintenance of these systems. The paper also reviews the commissioning programme, describing the milestones achieved and discussing some of the more interesting technical aspects which includes some unique Romanian input. In conclusion the paper looks at the organization of the mature fuel handling department from the operations, maintenance and technical support points of view and the long term plans for the future. (author). 1 fig.

  14. Fuel handling at Cernavoda 1 N.P.S. - commissioning and training philosophy

    International Nuclear Information System (INIS)

    Standen, G.W.; Tiron, C.; Marinescu, S.

    1996-01-01

    Efficient operation of a Candu nuclear power plant depends greatly on the reliable and safe operation of the fuel handling system. Successful commissioning of the system is obviously a key aspect of the reliability of the system and this coupled with a rigorous training programme for the fuel handling staff will ensure the system's safe operation. This paper describes the philosophy used at Cernavoda 1 N.P.S. for the commissioning of the fuel handling systems and for the training of staff for operation and maintenance of these systems. The paper also reviews the commissioning programme, describing the milestones achieved and discussing some of the more interesting technical aspects which includes some unique Romanian input. In conclusion the paper looks at the organization of the mature fuel handling department from the operations, maintenance and technical support points of view and the long term plans for the future. (author). 1 fig

  15. Analysis of the failed threaded rod from the support of the pipelines from CNE Cernavoda

    International Nuclear Information System (INIS)

    Fulger, M.; Mihalache, M.; Velciu, L.; Nitu, A.; Puscasu, C.

    2016-01-01

    The goal of the current study was analysis of one threaded rod from the support of pipelines from CNE Cernavoda raw water cooling system (RCW) to identify the causes of its breakage. For the failure analysis, were used following techniques: optical microscopy, scanning electron microscopy/ energy dispersive X - ray spectrometry (EDS) and mechanical tries (Brinell hardness). The conclusion was the failure had been caused by improper mounting of the rod in the spring guide system. Thus, a complex distribution of tensions emerged, rather than the vertical distribution as designed for the guide with spring. On the other hand, the presence of a hard impurity (titanium carbide), in the threaded region and the usage of a material with greater hardness and with higher chrome composition than specified in the project, had favored the appearance of a fatigue fissure, leading to a tear in the rod. (authors)

  16. Danube quality water assessment from the microbiological point of view in Cernavoda nuclear plant area

    International Nuclear Information System (INIS)

    Sundri, Mirela Iuliana

    2003-01-01

    Herein are analysed the following microbiological parameters: total viable count, total coliforms and faecal coliforms, which represent a standard indicator for water quality. The study has been done during 1998-2002 upon the water in the Danube River and in the channels for cooling water used by Cernavoda Nuclear Power Plant condensers. In this area, based on these values of evaluated parameters, the water feature is placed in the quality classes II and III (moderate and critical pollution), in conformity with European Community Directives. Bacterial communities, component part of aquatic biocenoses, are very important for matter and energy flux. Their contribution to self-purification processes of rivers is of great interest related to the water quality assessment. Microorganisms are ideal sensors, because they respond fast to the fluctuation of environmental conditions by specific changes, detectable physiologically and metabolically. The temperature is a major factor, which directly affects the intensity of all microbial processes. Because the microorganisms are interconnected with the other living organisms, the qualitative or quantitative changes of their activity will affect the functions of the whole ecosystem. Bacterial indicators such as total viable count (colony count), total coliforms or faecal coliforms (thermo-tolerant coliforms) are widely applied to the assessment of water quality. Because of their mostly allochthonus origin, these are used as indicators of changes in the natural water conditions; they point out an organic matter or faecal water pollution. Although the water quality can be considered acceptable from the chemical or biological point of view, the bacteriological parameters might be detected in critical concentration. The objectives of this microbiological assessment are analysis of the variation of bacteriological indicators in some sampling points of Cernavoda aquatic ecosystems area, and monitoring the manner of using the water by

  17. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  18. Chernobyl'-88. Reports of the 1. All-Union scientific and technical meeting on results of accident effect elimination at the Chernobyl' NPP. V. 7. Part 1. Localization of accident consequences at the 4th power unit, operating site of the Chernobyl NPP and adjoining territories

    International Nuclear Information System (INIS)

    Ignatenko, E.I.

    1989-01-01

    The next data on the accident consequence elimination are presented: temperature monitoring results, gamma radiation exposure dose rates, neutron and gamma fields, aerosol disperse composition. The information system for scientific researches FINISH and automatic subsystems for radiation control and the Ukrytie object diagnostics are described. Decontamination of the Chernobyl' NPP territory, equipment and rooms is described too

  19. Chernobyl'-88. Reports of the 1. All-Union scientific and technical meeting on results of accident effect elimination at the Chernobyl' NPP. V. 7. Part 2. Localization of accident consequences at the 4th power unit, operating site of the Chernobyl' NPP and adjoining territories

    International Nuclear Information System (INIS)

    Ignatenko, E.I.

    1989-01-01

    The next data on the accident consequence elimination are presented: temperature monitoring results, gamma radiation exposure dose rates, neutron and gamma fields, aerosol disperse composition. The information system for scientific researches FINISH and automatic subsystems for radiation control and the Ukrytie object diagnostics are described. Decontamination of the Chernobyl' NPP territory, equipment and rooms is described too

  20. Impact of nuclear information on the public acceptance. Case study for young people in Cernavoda and Pitesti towns

    International Nuclear Information System (INIS)

    Constantin, Marin; Diaconu, Daniela

    2007-01-01

    The general objective of this work was to investigate the impact of nuclear information on young people's knowledge and attitudes by using different Methods/Participatory Tools in an Educational Programme. The investigation started with a baseline survey of six groups of youngsters, three each from Pitesti and Cernavoda, which was completed early in 2005. After analysing the results an Educational Programme was proposed and developed following the FP6- COWAM2 Annual Seminar at Ljubljana. The Programme was produced by November 2005 and three methods were selected: classical methods usually used for school teaching, the discovery method, and a method involving simulation of a Local Committee. Three groups from Pitesti and four from Cernavoda attended the Programme, which was followed by a new questionnaire-based measurement (May 2006). (authors)

  1. GOES-R Advanced Baseline Imager: spectral response functions and radiometric biases with the NPP Visible Infrared Imaging Radiometer Suite evaluated for desert calibration sites.

    Science.gov (United States)

    Pearlman, Aaron; Pogorzala, David; Cao, Changyong

    2013-11-01

    The Advanced Baseline Imager (ABI), which will be launched in late 2015 on the National Oceanic and Atmospheric Administration's Geostationary Operational Environmental Satellite R-series satellite, will be evaluated in terms of its data quality postlaunch through comparisons with other satellite sensors such as the recently launched Visible Infrared Imaging Radiometer Suite (VIIRS) aboard the Suomi National Polar-orbiting Partnership satellite. The ABI has completed much of its prelaunch characterization and its developers have generated and released its channel spectral response functions (response versus wavelength). Using these responses and constraining a radiative transfer model with ground reflectance, aerosol, and water vapor measurements, we simulate observed top of atmosphere (TOA) reflectances for analogous visible and near infrared channels of the VIIRS and ABI sensors at the Sonoran Desert and White Sands National Monument sites and calculate the radiometric biases and their uncertainties. We also calculate sensor TOA reflectances using aircraft hyperspectral data from the Airborne Visible/Infrared Imaging Spectrometer to validate the uncertainties in several of the ABI and VIIRS channels and discuss the potential for validating the others. Once on-orbit, calibration scientists can use these biases to ensure ABI data quality and consistency to support the numerical weather prediction community and other data users. They can also use the results for ABI or VIIRS anomaly detection and resolution.

  2. Public acceptance of nuclear energy in Indonesia. A traditional puppet show for NPP in Java

    International Nuclear Information System (INIS)

    Suyudi Soeliarno

    1995-01-01

    In Indonesia, activities on public relation have been carried out since the establishment of the agency responsible for research and development of atomic energy in 1958 (which later in the year 1964 became Batan, National Atomic Energy Agency), wile activities on public acceptance started 'at the end of 1985. After the Government indicated that it has to look seriously into the construction of the NPP, as from 1990, the public acceptance (PA) activities have been intensified in anticipation of the construction of the first NPP. An important part of the preparatory activities for the construction of the NPP is preparing the people, particularly those who live near the NPP site, to accept and to support the NPP program. The interdepartmental team has bee established in August 1990 consisting of representatives of several institutions, namely, Ministry of Information, Ministry of Domestic Affairs, Ministry of Defense, Land Utilization Agency, State Electricity Corporation, Office of the Minister for Population and Environment, and Batan. This team, called the 'Team on Public Acceptance of NPP', has the main task providing extensive information to the public concerning the government plan to construct nuclear power plants in Indonesia. From 1990 through the middle of 1994 the activity of the Team on Public Acceptance of NPP was focused on providing information on te NPP program to the local community leaders and the public, particularly in the districts of the NPP site in the Muria Peninsula region. Its main purpose was to precondition the people who live near the NPP site to accept the NPP in their neighbourhood without fear

  3. NPOESS Preparatory Project (NPP) Science Overview

    Science.gov (United States)

    Butler, James J.

    2011-01-01

    NPP Instruments are: (1) well understood thanks to instrument comprehensive test, characterization and calibration programs. (2) Government team ready for October 25 launch followed by instrument activation and Intensive Calibration/Validation (ICV). NPP Data Products preliminary work includes: (1) JPSS Center for Satellite Applications and Research (STAR) team ready to support NPP ICV and operational data products. (2) NASA NPP science team ready to support NPP ICV and EOS data continuity.

  4. Workflow in Almaraz NPP

    International Nuclear Information System (INIS)

    Gonzalez Crego, E.; Martin Lopez-Suevos, C.

    2000-01-01

    Almaraz NPP decided to incorporate Workflow into its information system in response to the need to provide exhaustive follow-up and monitoring of each phase of the different procedures it manages. Oracle's Workflow was chosen for this purpose and it was integrated with previously developed applications. The objectives to be met in the incorporation of Workflow were as follows: Strict monitoring of procedures and processes. Detection of bottlenecks in the flow of information. Notification of those affected by pending tasks. Flexible allocation of tasks to user groups. Improved monitoring of management procedures. Improved communication. Similarly, special care was taken to: Integrate workflow processes with existing control panels. Synchronize workflow with installation procedures. Ensure that the system reflects use of paper forms. At present the Corrective Maintenance Request module is being operated using Workflow and the Work Orders and Notice of Order modules are about to follow suit. (Author)

  5. The main steps of the Romanian nuclear power program development - Accumulated experience

    International Nuclear Information System (INIS)

    Chirica, T.; Popescu, D.; Condu, M.; Vatamanu, M.

    1998-01-01

    The paper presents a historical summary of the Romanian Nuclear Power Program development, providing details for the main criteria and principles the Program was based upon, the contracts signed with the foreign partners to implement it, and the national participation (site contractors, suppliers and design organizations). The effect of the equipment assimilation program on the NPP Cernavoda (5x700 MWe) and especially on Unit 1 schedule and performance is analyzed. Further on the impact of the transition from centralized to a market economy over the Romanian Nuclear Power Program development is analyzed, providing information's on its actual status and perspectives for the next 20 years. A description of the NPP Cernavoda Unit 1 actual progress and of the main steps performed by RENEL to get finance to complete NPP Cernavoda Unit 2 is included. Finally there is summarized the accumulated experience, and its feed back on RENEL strategy to complete NPP Cernavoda Unit 2. (author)

  6. Shock absorber in Ignalina NPP

    International Nuclear Information System (INIS)

    Bulavas, A.; Muralis, J.

    1996-09-01

    Theoretical calculation and experimental analysis of models of shock absorber in Ignalina NPP is presented. The results obtained from the investigation with model of shock absorber coincide with the theoretical calculation. (author). 2 figs., 3 refs

  7. Dukovany NPP - Safely 16 TERA

    International Nuclear Information System (INIS)

    Vlcek, J.

    2008-01-01

    In this presentation increasing of power output of the Dukovany NPP is reviewed. To operate all Dukovany Units safely with the perspective of long-term operation (LTO) of 50 - 60 years it is proposed.

  8. Selection of NPP for Kazakhstan

    International Nuclear Information System (INIS)

    Zhotabaev, Zh.R.

    2003-01-01

    Commercial NPP for Kazakhstan should to meet to several main requirements: 1). Safety operation (accident probability not more than 10 -6 1/p. year). 2). High efficiency > 40 %. 3). Possibility of use for high-temperature chemistry and hydrogen production. 4). Possibility for manufacturing of considerable part of equipment in Kazakhstan. 5). Possibility for fuel production and reprocessing in Kazakhstan. 6). Independence from existence of large water-supply sources. Comparative analysis of several NPP with different reactors (WWR-1000, Candu, BREST, VG-400; graphite molten salt reactor) shows that NPP with the graphite molten salt reactor meets to all above requirements, but hydrogen production it is possible by more complete 4-stage technology, since coolant temperature is 800 Deg. C. The principle advantage is possibility of manufacturing of main equipment and fuel in Kazakhstan that reduce the cost of NPP construction and operation

  9. Modernization programme at Dukovany NPP

    International Nuclear Information System (INIS)

    Trnka, M.

    2000-01-01

    The main goal of each NPP is to produce electricity safely, economically and without influence to environment. For Dukovany NPP it means to upgrade all documentation and perform the Equipment Upgrading Programme. All these activities are time and money consuming and therefore the determination of priority of all items was necessary. In the presentation there are mentioned some important changes in documentation, results of PSA studies and reason for Equipment Upgrading Programme performance. It was selected the most important item from the list of Equipment Upgrading Programme the I and C upgrading. Management has decided that Dukovany NPP will become among the best NPPs with WWER type of reactor. It seems this decision is the best way how to extend lifetime of the NPP. (author)

  10. Psychology of NPP operation safety

    International Nuclear Information System (INIS)

    Tret'yakov, V.P.

    1993-01-01

    The book is devoted to psychologic investigations into different aspects of NPP operative personnel activities. The whole set of conditions on which successful and accident-free personnel operation depends, is analysed. Based on original engineering and socio-psychologic investigations complex psychologic support for NPP personnel and a system of training and upkeep of operative personnel skills are developed. The methods proposed have undergone a practical examination and proved their efficiency. 154 refs., 12 figs., 9 tabs

  11. Experience in exchanging pipes in NPP containments

    International Nuclear Information System (INIS)

    Russell, D.J.

    1987-01-01

    Very careful planning and scheduling of NPP retrofit projects involving replacement of piping, valves, pumps and steam generators is essential. To meet the schedule, the approved design engineering documents must be prepared in good time. A viable electronic data processing program must be adopted to track progress and feedback on-site, and care must be exercised during the last phase of the project, i.e. in preparation of the documentation packages. In addition, there must be training of a sufficient number of skilled and responsible personnel, and all necessary job positions must be manned adequately, with close attention paid to health physics

  12. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  13. Report of the IPERS (International Peer Review Service) pre-review mission for the Cernavoda nuclear power plant probabilistic safety evaluation (CPSE - PHASE B) in Romania 31 October to 3 November 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This report presents the results of the IAEA international peer review services pre-review mission which reviewed the status of the present version of the Cernavoda probabilistic safety evaluation, a Level 1 internal events Probabilistic Safety Assessment for the Cernavoda, Unit 1, nuclear power plant. 2 refs

  14. Survey of public participation potential regarding the Muria NPP program

    International Nuclear Information System (INIS)

    Yarianto-SBS; Sri Hariani Syarif; Heni Susiati; Imam Hamzah; Fepriadi

    2003-01-01

    Socio-culture aspect is a part of site feasibility evaluation of Nuclear Power Plant (NPP)program. Indonesia is under going democratization, therefore the paradigm of development has also been changed where the people have freedom or liberty and they can express their opinion independently. The people are significant factor that involving in the decision making of regional development.Even the socio-culture, such as social riot can reject the site. Therefore socio-culture aspect should be considered in the NPP site evaluation. The first step of the study,mapping of public participation potential should be conducted by field survey. The method used in there search is quantitative approach with field survey guided by questioner without any treatment of object sampled. Qualitative approach was also conducted by in-depth interview technique to collect more detailed information. Information were collected from general public without any stratification in the 10 km radius from NPP site. Sampling method used was full random sampling technique. The results of survey show that the most of the people have significant potential for participating in the NPP Program. Conducive atmosphere should be maintained by social setting, therefore the present good momentum will not be lost. (author)

  15. NPP Decommissioning: the concept; state of activities

    International Nuclear Information System (INIS)

    Nemytov, S.; Zimin, V.

    2001-01-01

    The main principles of NPP decommissioning concept in Russia are given. The conditions with fulfillment of works on NPP unit pre-decommissioning and decommissioning including: development of the normative documentation, creation of special fund for financing NPP decommissioning activities, deriving the Gosatomnadzor license for decommissioning of shut down NPP units, development of the equipment and technologies for waste and spent fuel management are presented. The decommissioning cost and labour intensity of one WWER-440 unit are shown. The practical works, executed on shut down units at Beloyarsk NPP (Unit1 and 2) and Novo Voronezh NPP (Unit 1 and 2) are outlined

  16. Development status of the cryogenic distillation system in Cernavoda Tritium Removal Facility

    International Nuclear Information System (INIS)

    Draghia, Mirela; Ana, George; Pasca, Gheorghe; Porcariu, Florina

    2009-01-01

    Full text: The reference design technology for the heavy water detritiation plant of Cernavoda CANDU station is based on combination of Liquid Phase Catalytic Exchange (LPCE) and Cryogenic Distillation (CD) processes. Based on this technology, tritium is transferred from the heavy water to a deuterium stream in the catalyzed isotopic exchange process, LPCE, followed by a final enrichment within the cryogenic distillation cascade. The final step is the tritium storage on metallic hydride. The basic function of the Cryogenic Distillation System (CDS) is the separation of tritium from the tritiated deuterium coming from the LPCE column in the following conditions: - the final product has to be tritium with a concentration of at least 99%; - it must be provided a detritiation factor of at least 100 (the ration between the tritium concentration in the deuterium stream fed to the CD system and the tritium concentration in the returned stream to the LPCE); - the deuterium must be enriched up to 99.995%, by removing the protium; - provisions for safe discharge of the entire inventory of the CD cascade into buffer vessels shall be implemented. To summarize, the present status of the project consists of technical documentation for all the components of CDS, including the P and ID (Pipping and Instrumentation Diagram), preliminary data sheets, technical specifications, drawings for the major components as the buffer vessels, coldbox, etc, and 3D models as well for almost all the components. (authors)

  17. Russian normative approach to the question of management of NPP life time

    International Nuclear Information System (INIS)

    Karpunin, N.I.

    2002-01-01

    Full text: In Russia, the designated service life of a nuclear power plant (NPP) is 30 years. During the period 2001-2010, 15 Russian NPP units will reach the end of their service life. The 'Basic Provisions of NPP Safety Assurance', OPB-88/97, Item 5.1.14, provide for a possible extension of NPP operation beyond the designated service life. For such an extension, the NPP operating organization must apply for a license renewal to Gosatomnadzor, which needs to specify the relevant requirements. GAN is developing regulatory documents to provide a basis for NPP license renewal/extension of NPP operation, which would benefit from international experience. In accordance with 'The program of Atomic Energy Development in the Russian Federation for 1998-2005 and up to 2010' adopted by Decree No. 815 of the Government of the Russian Federation on 21 July 1998, priority is placed on the preparation of NPPs for extension of service life and on ensuring safety in the extended operating period. The length of the extension beyond the designated service life is to be determined on the basis of a range of technical and economic considerations, including: The ability to ensure and maintain operational safety; Sufficient residual service life of the unit's non-repairable components; The availability of temporary storage facilities for the additional spent nuclear fuel and radioactive waste, or the possibility of its transport off-site; The ability to ensure safe handling of the radioactive waste generated during the extension period; To extend the lifetime of an NPP unit, the plant Operator is required to perform the following tasks: Carry out a comprehensive survey of the NPP unit; Draw up a programme of preparation for lifetime extension; Prepare the NPP unit for operation in the extended period; Carry out the necessary tests. There are also some normative documents, which regulate management of NPP life time. (author)

  18. Emergency preparedness at Ignalina NPP

    International Nuclear Information System (INIS)

    Kairys, A.

    1998-01-01

    Brief review of Ignalina NPP safety upgrading and personnel preparedness to act in cases of accidents is presented. Though great activities are performed in enhancing the plant operation safety, the Ignalina NPP management pays a lot of attention to preparedness for emergency elimination and take measures to stop emergency spreading. A new Ignalina NPP emergency preparedness plan was drawn up and became operational. It is the main document to carry out organizational, technical, medical, evacuation and other activities to protect plant personnel, population, the plant and the environment from accident consequences. Great assistance was rendered by Swedish experts in drawing this new emergency preparedness plan. The plan consists of 3 parts: general part, operative part and appendixes. The plan is applied to the Ignalina NPP personnel, Special and Fire Brigade and also to other contractor organizations personnel carrying out works at Ignalina NPP. There are set the following emergency classes: incident, emergency situation, alert, local emergency, general emergency. Separate intervention level corresponds to each emergency class. Overview of personnel training to act in case of an emergency is also presented

  19. On-site and off-site activities

    International Nuclear Information System (INIS)

    Martin, H.D.

    1986-01-01

    Design principles for NPP training programs. Effects of NPP contracts. Effects of domestic industrial activities. The role of international bodies. Requirements for on-site training. Training abroad, technical, financial and social aspects. Training center on-site, an evaluation. (orig.)

  20. Regulatory approach to NPP ageing in Bulgaria

    International Nuclear Information System (INIS)

    Vassilev, D.

    2000-01-01

    In this contribution summary information of Kozloduy NPP units is presented. The nuclear legislation, regulatory approach for managing safety aspects on NPP ageing, short term programme, complex programme PRG'97 ant other aspects of ageing management are discussed

  1. Some problems of NPP personnel training

    International Nuclear Information System (INIS)

    Vajshnis, P.P.; Kumkov, L.P.; Omel'chuk, V.V.

    1984-01-01

    Shortcomings of NPP personnel training are discussed. Development of full-scale training systems is necessary for qualitative training operative personnel. Primary problems that should be necessarily solved for ensuring effective training NPP personnel are considered

  2. Strategy for decommissioning of NPP's in Germany

    International Nuclear Information System (INIS)

    Rittscher, D.; Sterner, H.

    2003-01-01

    According to German Atomic Law, two different strategies are possible, i.e. direct dismantling and safe enclosure before dismantling. Both approaches have their advantages and disadvantages. Taking into account the site and plant specific conditions the optimal strategy can be evaluated. Both approaches have been applied in Germany in the past. The German Atomic Law and the Radiation Protection Ordinance (June 2002) were adapted recently (July 2002). Additionally, the life operation time of the German NPP's was fixed in a new law (April 2002): Orderly Termination of the Commercial Production of Nuclear Electricity. These issues have made it necessary for the power utilities to review the strategies applied. As long as the final disposal in Germany is still an open issue, the construction of local Interim Stores is necessary to be able to dismantle a NPP. The basic strategies are not excluding each other and it seems clear today, that the optimal approach is a combination of these strategies, e.g. dismantling of all auxiliary systems and leaving activated parts for a longer SE period. Within this approach the advantages of both basic strategies have been integrated in one. The EWN GmbH has developed such integrated but still different approaches for the decommissioning projects of the Kernkraftwerke Greifswald (KGR) and the Arbeitsgemeinschaft Versuchsreaktor (AVR) Juelich. It can be stated that the decommissioning of a NPP does not present technical issues of concern, but is more a project management issue, although surrounded by sometime intricate political and juridical boundary conditions. A major strategy change is to be expected only when final disposal capacities are available in the future. (authors)

  3. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Kastchiev, G.

    1999-01-01

    Extensive review of the NPP Safety is presented including tasks of Ministry of Health, Ministry of Internal Affairs, Ministry of Environment and Waters, Ministry of Defense in the field of national system for monitoring the nuclear power. In the frame of national nuclear safety legislation Bulgaria is in the process of approximation of the national legislation to that of EC. Detailed analysis of the status of regulatory body, its functions, organisation structure, responsibilities and future tasks is included. Basis for establishing the system of regulatory inspections and safety enforcement as well as intensification of inspections is described. Assessment of safety modifications is concerned with complex program for reconstruction of Units 1-4 of Kozloduy NPP, as well as for modernisation of Units 5 and 6. Qualification and licensing of the NPP personnel, Year 2000 problem, priorities and the need of international assistance are mentioned

  4. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  5. Safety culture at Mochovce NPP

    International Nuclear Information System (INIS)

    Markus, Jozef; Feik, Karol

    2002-01-01

    This article presents the approach of Mochovce NPP to the Safety culture. It presents activities, which have been taken by Mochovce NPP up to date in the area of Safety culture enhancement with the aim of getting the term into the subconscious of each employee, and thus minimising the human factor impact on occurrence of operational events in all safety areas. The article furthermore presents the most essential information on how the elements characterising a continuous progress in reaching the planned Safety culture goals of the company management have been implemented at Mochovce NPP, as well as the management's efforts to get among the best nuclear power plant operators in this area and to be an example for the others. (author)

  6. Radioactive wastes management of NPP

    International Nuclear Information System (INIS)

    Klyuchnikov, A.A.; Pazukhin, Eh.M.; Shigera, Yu. M.; Shigera, V.Yu.

    2005-01-01

    Modern knowledge in the field of radiation waste management on example of the most serious man-made accident at Chernobyl NPP are illuminated. This nuclear power plant that after accident in 1986 became in definite aspect an experimental scientific ground, includes all variety of problems which have to be solved by NPP personnel and specialists from scientific organizations. This book is aimed for large sphere of readers. It will be useful for students, engineers, specialists and those working in the field of nuclear power, ionizing source and radiation technology use for acquiring modern experience in nuclear material management

  7. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  8. NPP Krsko secondary side analysis

    International Nuclear Information System (INIS)

    Fabijan, Lj.

    1987-01-01

    The purpose of this work is to analyze secondary side thermohydraulics response on steam generator tube plugging in order to ensure nominal NPP power. We had established that the additional opening of the governing valve No. 3 and 4 can compensate pressure drop caused by steam generator tube plugging. Two main steam flows with four governing valves were simulated. Steam expansion in turbine and feed water system was modeled separately. All important process point and steam moisture changes impact on nominal NPP power were analysed. (author)

  9. The Chernobyl NPP decommissioning: Current status and alternatives

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Steinberg, N.

    1996-01-01

    After the Chernobyl accident of April 26, 1986, many contradictory decisions were taken concerning the Chernobyl nuclear power plant (NPP) future. The principal source of contradictions was a deadline for a final shutdown of the Chernobyl NPP units. Alterations in a political and socioeconomic environment resulted in the latest decision of the Ukrainian Authorities about 2000 as a deadline for a beginning of the Chernobyl NPP decommissioning. The date seems a sound compromise among the parties concerned. However, in order to meet the data a lot of work should be done. First of all, a decommissioning strategy has to be established. The problem is complicated due to both site-specific aspects and an absence of proven solutions for the RBMK-type reactor decommissioning. In the paper the problem of decommissioning option selection is considered taking into account an influence of the following factors: relevant legislative and regulatory requirements; resources required to carry out decommissioning (man-power, equipment, technologies, waste management infrastructure, etc.); radiological and physical status of the plant, including structural integrity and predictable age and weather effects; impact of planned activities at the destroyed unit 4 and within the 30-km exclusion zone of the Chernobyl NPP; planed use of the site; socio-economic considerations

  10. Low level radioactive waste disposal in Kozloduy NPP in Bulgaria

    International Nuclear Information System (INIS)

    Stanchev, V.

    2001-01-01

    Kozloduy NPP is the biggest power plant in the Republic of Bulgaria. It is in operation since 1974 and for the past 25 years it has generated over 263 billion kWh electric power. The NPP share in the total electric production in 1998 was about 50%. It has six units in operation - four WWER 440 B-230 and two WWER 1000 B-320. In the nuclear reactor operation the generation of radioactive waste (RAW) is an inevitable process. The waste must be conditioned, stored and disposed of in a safe manner. There are no national radioactive waste disposal facilities, for waste generated by an NPP, in Bulgaria to the moment. This situation necessitates the storage of operational RAW to be carried out on site for a long period of time (30 to 50 years). Following the principle for protection of human health and environment now and in the future, Kozloduy NPP adopted the concept for conditioning the RAW to a stable solid form and placing the waste in a package which should keep its features for a sufficiently long term so that the package can be safely transported to the disposal site. (author)

  11. The V-1 NPP and V-2 NPP upgrading

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities in the V-1 NPP and V-2 NPP upgrading as well as maintenance carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. The V-1 NPP applied the so called 'Small Backfitting Programme'covering 81 points of the Czechoslovak Atomic energy Commission Decree No 5/91. Continual upgrading continued after the Backfitting Programme completion with the Safety Report and following Nuclear Regulatory Authority of Slovak Republic (NRA SR) Decrees No 1/94 and 110/94 setting spheres and procedure for adopting and implementation of measures enabling the units to operate further on. Results of expert missions, analyses and assessments of components identified by Basic Engineering became the basis for the development of the Gradual Reconstruction Programme. The Programme outputs underwent economic and probabilistic assessing their contribution to nuclear safety. This process resulted in finalizing the Gradual Reconstruction Programme which started to be implemented in 1996 and will be completed in 1999. It is implemented by the REKON consortium and covers 17 areas including Instrumentation and Control, self-consumption emergency supply, leakage monitoring, emergency core cooling system, seismic reinforcement and radioactivity localisation. Both units will reach internationally acceptable safety standards for the remaining life-time period. The V-2 NPP Upgrading and Safety Enhancement Programme includes results of activities performed in the course of last years to define all important activities leading to enhancement of nuclear safety and performance reliability and effectiveness within the plant life-time period and to establish conditions for extending the life-time of these units for 40 years. The V-2 NPP Upgrading and Safety Enhancement Programme aims to assure safe operation with a probability of the core damages less than 10 -4 /reactor · year

  12. Safety aspects of NPP ageing

    International Nuclear Information System (INIS)

    1995-01-01

    Preparation of safety practices on assessment and management of aging of major NPP components important to safety, CRP on management of aging of concrete containment buildings, CRP on management of aging of in-containment instrumentation and control cables are outlined

  13. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  14. Radiation protection in decommissioning of the NPP V1

    International Nuclear Information System (INIS)

    Svitek, J.; Kaizer, J.; Siska, J.

    2014-01-01

    What's new in decommissioning of the NPP V1? In 2014 the first stage of the decommissioning should be finished. The program of the first stage was characterized by decommissioning of the non-contaminated facilities and buildings (facilities and buildings out of the control area). However, during the first stage, two key activities were done during which radiation protection had to be especially supervised: BIDSF project - Treatment and Conditioning of Wet Historical Waste - Sludge and Sorbents in the operational tanks NPP V1 (the treatment has been the condition of the regulatory body for the ending of the first stage) and preparation of decontamination of both primary circuits NPP (without reactors). In the year 2015, the second stage of decommissioning should be started. Program for the second stage is broad and it includes fragmentation and treatment of activated parts of the primary circuits (reactors, their internal parts, shielding cassettes). Modification of the radiation protection equipment on the NPP site has been made by BIDSF projects. During the first stage, two basic projects have been done: C12 - Refurbishment of the radiation protection monitoring equipment and C-10 - Free release of decommissioning materials. The present state of monitoring systems, as the result of the aforementioned projects, and the first experiences are main part of this presentation. Another activity, which prepared basic conditions for an execution of radiation protection in the second stage of decommissioning, was the preparation of documents for the procurement of license for the second stage of decommissioning. (authors)

  15. Redesign of emergency water supply system by-pass line from Cernavoda NPP Unit 1 and 2 using self regulating valves

    International Nuclear Information System (INIS)

    Tenescu, Mircea; Bigu, Melania; Nita, Iulian Pavel

    2010-01-01

    In this paper one considered improving the EWS (emergency water supply system) by-pass line in order to replace current manual operated valve with an self operated valve. This change is necessary in order to reduce the human error events in operation of the system in case of a DBE (design basis earthquake). The paper describes a theoretical and practical operation of a system using self regulating flow rate valves. Basically, the elimination of a possible human error in operating a system is important for nuclear safety in case of a DBE because it makes it avoidable in normal reactor cooling systems. The paper describes checking of the functioning of this equipment in operating conditions, investigating how it responds to various operating regimes. (authors)

  16. Role of PRA in new NPP projects

    International Nuclear Information System (INIS)

    Julin, A.; Sandberg, J.; Virolainen, R.

    2012-01-01

    In Finland, a plant specific, Level 1 and 2 Probabilistic Risk Analysis (PRA) is required as a prerequisite for issuing the construction license and operating license. The use of PRA in various applications and the main insights are presented. These applications include e.g. PRA support to the design of SSCs (Systems, Structures and Components), definition of pre-service and in-service inspection programs, evaluation of the safety classification of SSCs, development of procedures, training and in definition of risk informed technical specifications, periodic testing and on-line preventive maintenance programs. In addition, PRA shall be used to assess the adequacy and coverage of the phase and system commissioning programs. Also the potential risks related to commissioning tests during nuclear test phase, shall be assessed with the help of PRA. In OL3 project, risk informed approach has been applied on a large scale for the first time in the design, construction and commissioning of a new NPP unit. Pre-nuclear commissioning tests have started at OL3 site and the plant is foreseen to begin commercial operation in 2013. Decisions have been made to launch new NPP projects. Teollisuuden Voima Oyj (TVO) is planning to build a new unit (OL4) at Olkiluoto site and a new utility, Fennovoima, is planning to build one unit at one of two alternative green field sites in Northern parts of Finland. Insights from PRAs of operating NPPs have been used in the evaluation of possible new sites to ensure that the site specific concerns and environmental conditions are adequately taken into account in the design of SSCs. Although the seismic activity at the Olkiluoto site is low, a comprehensive seismic risk analysis is being conducted. Its results support the review of the deterministic seismic design. For new sites, a probabilistic seismic hazard analysis has been carried out for the determination of the design earthquake. Experiences from OL3 licensing have been utilized in the

  17. Evaluation of the atmospheric transport modeling tools used at the Ignalina NPP

    International Nuclear Information System (INIS)

    Jasiulionis, R.

    2004-01-01

    The atmospheric transport modeling system at the Ignalina NPP is part of the radionuclide monitoring system and is designed to help associate radionuclide network signals with possible source regions. The evaluation of the Atmospheric Transport Modeling Tools Used at the Ignalina NPP was based on results published in last years. The model based on semi-empirical formulae of turbulent diffusion in the air and local meteorological data were used for calculation of concentration of radionuclides emitted through the Ignalina NPP stack. Meteorological data (wind velocity and direction as well as temperature at a height of 2 and 30 meters) were obtained from the meteorological station of the Ignalina NPP at Visaginas. Using the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model, trajectories of air masses transport to the Ignalina NPP region (56.55 N, 26.57 E) during 95 hours at heights of 100, 500 and 1000 m were calculated. The dispersion in the ground-level air of emissions through the Ignalina NPP stack can also be calculated using the HYSPLIT model. The data on the radionuclide activity concentrations in the air at the measurements site and results of calculation can used for the establishment of their field in the Ignalina NPP region. (author)

  18. Seismic safety of building structures of NPP Kozloduy III

    International Nuclear Information System (INIS)

    Varbanov, G.I.; Kostov, M.K.; Stefanov, D.D.; Kaneva, A.D.

    2005-01-01

    In the proposed paper is presented a general summary of the analyses carried out to evaluate the dynamic behavior and to assess the seismic safety of some safety related building structures of NPP Kozloduy. The design seismic loads for the site of Kozloduy NPP has been reevaluated and increased during and after the construction of investigated Units 5 and 6. Deterministic and probabilistic approaches are applied to assess the seismic vulnerability of the investigated structures, taking into account the newly defined seismic excitations. The presented results show sufficient seismic safety for the studied critical structures and good efficiency of the seismic upgrading. The applicability of the investigated structures at sites with some higher seismic activities is discussed. The presented study is dealing mainly with the civil structures of the Reactor building, Turbine hall, Diesel Generator Station and Water Intake Structure. (authors)

  19. 'Kozloduy' NPP geological environment as a barrier against radionuclide migration

    International Nuclear Information System (INIS)

    Antonov, D.

    2000-01-01

    The aim of this report is to present an analysis of the geological settings along Kozloduy NPP area from the viewpoint of a natural, protective barrier against unacceptable radionuclides migration in the environment. Possible sources of such migration could be an eventual accident in an active nuclear plant; radioactive releases from decommissioned Power Units or from temporary or permanent radioactive waste repositories. The report is directed mainly to the last case, and especially to the site selection for near surface short lived low and intermediate level (LILW) radioactive repository. The main conclusion of the geological settings assessment and of the many years monitoring is that the Kozloduy NPP area offers good possibilities for site selection of LILW repository. (author)

  20. Report on Fukushima Daiichi NPP precursor events

    International Nuclear Information System (INIS)

    2014-01-01

    The main questions to be answered by this report were: The Fukushima Daiichi NPP accident, could it have been prevented? If there is a next severe accident, may it be prevented? To answer the first question, the report addressed several aspects. First, the report investigated whether precursors to the Fukushima Daiichi NPP accident existed in the operating experience; second, the reasons why these precursors did not evolve into a severe accident. Third, whether lessons learned from these precursor events were adequately considered by member countries; and finally, if the operating experience feedback system needs to be improved, based on the previous analysis. To address the second question which is much more challenging, the report considered precursor events identified through a search and analysis of the IRS database and also precursors events based on risk significance. Both methods can point out areas where further work may be needed, even if it depends heavily on design and site-specific factors. From the operating experience side, more efforts are needed to ensure timely and full implementation of lessons learnt from precursor events. Concerning risk considerations, a combined use of risk precursors and operating experience may drive to effective changes to plants to reduce risk. The report also contains a short description and evaluation of selected precursors that are related to the course of the Fukushima Daiichi NPP accident. The report addresses the question whether operating experience feedback can be effectively used to identify plant vulnerabilities and minimize potential for severe core damage accidents. Based on several of the precursor events national or international in-depth evaluations were started. The vulnerability of NPPs due to external and internal flooding has clearly been addressed. In addition to the IRS based investigation, the WGRISK was asked to identify important precursor events based on risk significance. These precursors have

  1. Estimating decontamination efficiency of territory, adjoining to the Chernobyl' NPP

    International Nuclear Information System (INIS)

    Konstantinov, E.A.; Sanitarov, V.A.; Stepanov, I.K.; Senin, E.V.; Filippov, E.M.; Shiraj, A.P.; Umanets, M.P.

    1989-01-01

    The NPP territory decontamination was fulfilled according to the next scheme: 1) removal of the soil upper layer and its moving avay for burial; 2) concrete plate laying; 3) concreting seams between plates and piling up polymer coatings. The conclusion is made that substantial improvement of radiation situation at the operating site is possible only after removal of radiation sources at the machine room roofing. 1 ref.; 5 figs.; 2 tabs

  2. ASSET experience at Paks NPP

    International Nuclear Information System (INIS)

    Szabo, I.

    1997-01-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones

  3. Retrofitting of NPP Computer systems

    International Nuclear Information System (INIS)

    Pettersen, G.

    1994-01-01

    Retrofitting of nuclear power plant control rooms is a continuing process for most utilities. This involves introducing and/or extending computer-based solutions for surveillance and control as well as improving the human-computer interface. The paper describes typical requirements when retrofitting NPP process computer systems, and focuses on the activities of Institute for energieteknikk, OECD Halden Reactor project with respect to such retrofitting, using examples from actual delivery projects. In particular, a project carried out for Forsmarksverket in Sweden comprising upgrade of the operator system in the control rooms of units 1 and 2 is described. As many of the problems of retrofitting NPP process computer systems are similar to such work in other kinds of process industries, an example from a non-nuclear application area is also given

  4. ASSET experience at Paks NPP

    Energy Technology Data Exchange (ETDEWEB)

    Szabo, I [Operational Safety Dept., Paks NPP, Paks (Hungary)

    1997-10-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones.

  5. Nuclear Fuel in Cofrentes NPP

    International Nuclear Information System (INIS)

    2002-01-01

    Fuel is an essential in the nuclear power generating business because of its direct implications on safety, generating costs and the operating conditions and limitations of the facility. Fuel management in Cofrentes NPP has been targeted at optimized operation, enhanced reliability and the search for an in-depth knowledge of the design and licensing processes that will provide Iberdrola,as the responsible operator, with access to independent control of safety aspects related to fuel and free access to manufacturing markets. (Author)

  6. NPP Krsko Living PSA Concept

    International Nuclear Information System (INIS)

    Vrbanic, I.; Spiler, J.

    2000-01-01

    NPP Krsko developed PSA model of internal and external initiators within the frame of the Individual Plant Examination (IPE) project. Within this project PSA model was used to examine the existing plant design features. In order to continue with use of this PSA model upon the completion of IPE in various risk-informed applications in support of plant operation and evaluations of design changes, an appropriate living PSA concept needed to be defined. The Living PSA concept is in NPP Krsko considered as being a set of activities pursued in order to update existing PSA model in a manner that it appropriately represents the plant design, operation practice and history. Only a PSA model which is being updated in this manner can serve as a platform for plant-specific risk informed applications. The NPP Krsko living PSA concept is based on the following major ponts. First, the baseline PSA model is defined, which is to be maintained and updated and which is to be reference point for any risk-informed application. Second, issues having a potential for impact on baseline PSA model are identified and procedure and responsibilities for their permanent monitoring and evaluation are established. Third, manner is defined in which consequential changes to baseline PSA model are implemented and controlled, together with associated responsibilities. Finally, the process is defined by which the existing version of baseline PSA model is superseded by a new one. Each time a new version of baseline PSA model is released, it would be re-quantified and the results evaluated and interpreted. By documenting these re-quantifications and evaluations of results in a sequence, the track is being kept of changes in long-term averaged risk perspective, represented by long-term averaged frequencies of core damage and pre-defined release categories. These major topics of NPP Krsko living PSA concept are presented and discussed in the paper. (author)

  7. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  8. On the NPP structural reliability

    International Nuclear Information System (INIS)

    Klemin, A.I.; Polyakov, E.F.

    1980-01-01

    Reviewed are the main statements peculiarities and possibilities of the first branch guiding technical material (GTM) ''The methods of calculation of structural reliability of NPP and its systems at the stage of projecting''. It is stated, that in GTM presented are recomendations on the calculation of reliability of such specific systems, as the system of the reactor control and protection the system of measuring instruments and automatics and safe systems. GTM are based on analytical methods of modern theory of realibility with the Use of metodology of minimal cross sections of complex systems. It is stressed, that the calculations on the proposed methods permit to calculate a wide complex of reliability parameters, reflecting separately or together prorerties of NPP dependability and maintainability. For NPP, operating by a variable schedule of leading, aditionally considered are parameters, characterizing reliability with account of the proposed regime of power change, i.e. taking into account failures, caused by decrease of the obtained power lower, than the reguired or increase of the required power higher, than the obtained

  9. Site selection for nuclear power plants

    International Nuclear Information System (INIS)

    Ehjchkholz, D.

    1980-01-01

    Problem of NPP site selection in the USA including engineering factors, radiation and environmental protection factors is stated in detail. Floating and underground sites are considered especially. The attention in paid to waste storage and risk criterium in siting [ru

  10. Prospects for the NPP Krsko Radioactive Waste Management

    International Nuclear Information System (INIS)

    Knapp, A.; Levanat, I.; Saponja-Milutinovic, D.

    2016-01-01

    Croatia adopted Strategy of radioactive waste, used sources and spent fuel management in 2014, and its Law on radiological and nuclear safety was accordingly modified in 2015. The Strategy foresees (though with some flexibility) and the Law declares decidedly that Croatia will establish a Center for radioactive waste management, in which all necessary facilities for storage and subsequent disposal of the Croatian share of the NPP Krsko radioactive waste and spent fuel will be developed. However, Slovenia and Croatia have recently agreed that a long-term dry storage for spent fuel will be established on the NPP premises by the year 2019. Therefore, only the issues of low and intermediate level waste (LILW) are addressed here. In Slovenia, the LILW repository site Vrbina in Krsko municipality was officially confirmed in 2009. Based on the 2013 investment program for a silo-type disposal facility, preparation of the repository project documentation was contracted with a national engineering company in 2014. Slovenian repository concept has been developed in two variants: one for the Slovenian LILW only, and the other intended to accept the Croatian share of LILW from the NPP as well. In the summer of 2015 Slovenia for the first time made an official offer to Croatia to use Vrbina repository for that purpose. However, the Croatian Strategy also does not preclude the option of management of all LILW from the NPP in Croatia. Therefore, present plan of activities for the third revision of the NPP radioactive waste and spent fuel management program outlines hypothetically symmetrical LILW management options: all in Slovenia, or all in Croatia, or one half in each country. So, what shall it be? This paper discusses the prospects for each of the three above mentioned options. The major problem of the Slovenian disposal plan is its high cost, mostly due to high compensations to the local community, which will be hard to finance without Croatian participation. The simplest

  11. Review of the main issues connected with the Belene NPP project

    International Nuclear Information System (INIS)

    Simeonov, P.

    1996-01-01

    The basic seismic studies connected with the construction of the second NPP in Bulgaria are outlined. The site selected for this plant is located on the right bank of the Donau River, near the Belene town. The seismicity of the site is investigated by the Bulgarian Academy of Sciences (BAS) and Energoproject Ltd., Sofia, and assessed by IAEA, Siemens, EQE and Westinghouse experts. The suggested coefficient for maximum seismic acceleration of 0.24 g takes into account the safety of the site, structures and equipment of the NPP. The conclusion made is that from seismic point of view the site is not hazardous. Construction works started in 1987 and were stopped in 1990 due to financial and socio-ecological reasons. The author's opinion is that the construction of the Belene NPP has no alternative and should be completed providing higher safety and reliability of the plant operation

  12. Metamorphosis of NPP A1, V1, V2

    International Nuclear Information System (INIS)

    Dobak, D.; Moncekova, M.

    2005-01-01

    In this book the history of construction, commissioning and exploitation of NPP A1, NPP V1 and NPP V2 in Jaslovske Bohunice is presented on documentary photos. Vicinity around of these NPPs is presented, too

  13. Ignalina NPP: living and working conditions

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The conference was devoted to discuss the social problems related with the operation of Ignalina NPP. The main topics are the following: analysis of public opinion of surrounding region of Ignalina NPP including neighbouring Daugavpils district in Latvia, environment impact evaluation of Daugavpils district, assessment of the influence of Ignalina NPP operation to the development of business in the region, investigation of problems of Visaginas town - residence of Ignalina NPP personnel. The specificity of Visaginas (former Sniechkus) is defined by the majority of non-native Lithuanians living there. Cultural transformation and political organization of the region were surveyed as well

  14. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    according to Corrective Action Program, which establishes guidance on the effective and efficient use of operating experience information to improve plant/personnel safety, plant reliability and commercial performance. The primary objectives of the Operating Experience Program are to promote the identification and transfer of lessons learned from internal and industry events to the plant personnel, and assure that such lessons are shared between Krsko NPP and the nuclear industry. The Operating Experience Program expects to prevent similar events from occurring at Krsko NPP by increasing plant personnel awareness of previous on-site and industry events and issues. Operating Experience Program should also identify and analyze weaknesses of the minor events and near misses in order to prevent occurrence of significant events. The purpose of this article is to present part of the Krsko NPP Operating Experience Program regarding to industry events. It will describe the methodology for receiving, processing, screening, reviewing, evaluating, status reporting, defining and implementing preventive/corrective actions in response to operating experience information of the events occurring off-site.(author).

  15. Consideration for a tritium removal facility at the Cernavoda Nuclear Power Station

    International Nuclear Information System (INIS)

    2006-01-01

    Full text: A pre-feasibility study considering process options for a Tritium Removal Facility at the Cernavoda Nuclear Power Station has been completed by ICIT and AECL. Three different process options were considered. These three options differ in the front-end process used to transfer tritium from heavy water to deuterium gas. All three options use cryogenic distillation (CD) as a back end process to extract tritium from the deuterium gas stream and concentrate it into a small volume stream of pure DT or T 2 that can be immobilized on a titanium sponge. The first option for the front-end process is Liquid Phase Catalytic Exchange (LPCE). The LPCE column is used to transfer the tritium from the heavy water to a recirculating stream of deuterium gas. The separation of hydrogen isotopes takes place in the cryogenic distillation column. Tritium-depleted deuterium gas from the CD system is fed back to the LPCE column. The cryogenic distillation system concentrates the tritium into a small volume of elemental tritium for storage. Tritiated heavy water that has been purified to remove catalyst poisons is fed to the top of the LPCE column. The heavy water leaving the column is depleted in deuterium. Both existing detritiation plants built to detritiate CANDU reactors (the Darlington TRF in Canada and the Wolsung TRF in Korea) use variations of the LPCE-CD process. The second option uses electrolysis to convert tritiated heavy water into oxygen and tritiated deuterium gas. The deuterium gas is sent to the Cryogenic Distillation system to extract and concentrate the tritium. The tritium depleted deuterium gas is recombined with the electrolytic oxygen to give a tritium-depleted heavy water product. The third option uses a Combined Electrolysis and Catalytic Exchange (CECE) front end. A CECE process concentrates the tritium in the water and, using water electrolysis, converts the concentrated tritium into deuterium gas. An overhead catalytic recombiner converts the

  16. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  17. Radiation monitoring in the NPP environment, control of radioactivity in NPP-environment system

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1987-01-01

    Problems of radiation monitoring and control of the NPP-environment system (NPPES) are considered. Radiation control system at the NPP and in the environment provides for the control of the NPP, considered as the source of radioactive releases in the environment and for the environmental radiation climate control. It is shown, that the radiation control of the NPP-environment system must be based on the ecological normalization principles of the NPP environmental impacts. Ecological normalization should be individual for the NPP region of each ecosystem. The necessity to organize and conduct radiation ecological monitoring in the NPP regions is pointed out. Radiation ecological monitoring will provide for both environmental current radiation control and information for mathematical models, used in the NPPES radiation control

  18. Display systems for NPP control

    International Nuclear Information System (INIS)

    Rozov, S.S.

    1988-01-01

    Main trends in development of display systems used as the means for image displaying in NPP control systems are considered. It is shown that colour display devices appear to be the most universal means for concentrated data presentation. Along with digital means the display systems provide for high-speed response, sufficient for operative control of executive mechanisms. A conclusion is drawn that further development of display systems will move towards creation of large colour fields (on reflection base or with multicolour gas-discharge elements)

  19. Safety culture in Ignalina NPP, regulatory view

    Energy Technology Data Exchange (ETDEWEB)

    Maksimovas, G [VATESI (Lithuania)

    1997-09-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP.

  20. Safety culture in Ignalina NPP, regulatory view

    International Nuclear Information System (INIS)

    Maksimovas, G.

    1997-01-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP

  1. Constructive approaches to the space NPP designing

    International Nuclear Information System (INIS)

    Eremin, A.G.; Korobkov, L.S.; Matveev, A.V.; Trukhanov, Yu.L.; Pyshko, A.P.

    2000-01-01

    An example of designing a space NPP intended for power supply of telecommunication satellite is considered. It is shown that the designing approach based on the introduction of a leading criterion and dividing the design problems in two independent groups (reactor with radiation shield and equipment module) permits to develop the optimal design of a space NPP [ru

  2. NPP Bohunice experience with ASSET services

    International Nuclear Information System (INIS)

    Klimo, J.

    1996-01-01

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author)

  3. NPP Bohunice experience with ASSET services

    Energy Technology Data Exchange (ETDEWEB)

    Klimo, J [Bohunice NPP (Slovakia)

    1997-12-31

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author).

  4. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  5. Barsebaeck NPP in Sweden - Decommissioning Project

    International Nuclear Information System (INIS)

    Hakan, Lorentz

    2009-01-01

    Barsebaeck 1 and 2, type BWR (Boiling Water Reactor) with a capacity of 615 MWe was closed down permanently on 30 November 1999 respective 31 May 2005 due to political decision. Both units together have been in Service operation (Care and maintenance) since 1 December 2006. Barsebaeck NPP will stay in Service operation until beginning of 2018 when Dismantling operation begins with the aim of a free-realized site in the beginning of 2025. That means that the remaining buildings, including equipment should be declared free-released or dismantled. It would then be up to the owner, E.ON Kaernkraft Sverige AB (EKS) to decide what is to be done with the site in the future. There was a re-organisation at Barsebaeck Kraft AB (BKAB) in 1 January 2007 and the company is organised in the following areas of function: site service operation, decommissioning planning, new business and BO replacement. The Organisation at BKAB has gone down from 450 during operation of Barsebaeck 1 and 2 to 50 employees (2009-01-01) involved in Service operation of both units. But still there are in total 250 persons placed at Barsebaeck NPP with different kinds of job assignments. A lot of activities have been carried out since 2000 and up to now for example: - All nuclear fuel has been transported away to interim storage at CLAB in Oskarshamn. - BKAB have built up contact nets and competence by taking part in different kinds of national and international organisations (SKB, IAEA, OECD/NEA TAG, WNA, ENISS, WANO, EPRI etc) commissions. - The Electrical and operational systems have been rebuilt for the actual demands and requirements for the Service operation. - The central control room is unattended since 17 December 2007 and the supervision of the Service operation is handled by a system of VDI (duty engineers) and LOP (alarm operators). - Full system decontamination on unit 1 and 2. Barsebaeck's approach today and for the future dismantling are: - Safer; - Faster; - Cost effective. BKAB

  6. Planning, conduct and principal features of NPP emergency exercises in Switzerland

    International Nuclear Information System (INIS)

    Baggenstos, M.

    1993-01-01

    Emergency exercises for each NPP are required on a regular basis by the Swiss Nuclear Safety Inspectorate. The purpose of such exercises is to train the NPP staff and the on-site emergency organization in the application of the emergency procedures and the cooperation with off-site emergency teams and public authorities. The paper discusses the purpose of the emergency exercises and experiences made especially with bilateral exercises. The responsibilities for the preparation and execution of the different emergency exercises in Switzerland are explained

  7. Seismic soil-structure-equipment interaction analysis of unit 5/6, Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kostov, M [Bulgarian Academy of Sciences, Central Laboratory for Seismic Mechanics and Earthquake Engineering, Sofia (Bulgaria)

    1995-07-01

    This research project is aimed to analyse problems of soil-structure-equipment interaction under seismic excitation in case of Kozloduy NPP. Reevaluation and upgrading of Kozloduy NPP has started after 1977 Vrancea earthquake. New Safe Shutdown Earthquake (SSE) level was defined, upgrading most of structural equipment was performed, seismic instrumentation was installed. New investigations were initiated after 1990 IAEA mission visited the site. A comprehensive site confirmation project was started with a subsequent structural and equipment reevaluation and upgrading. This work deals with Units 5 and 6 of WWER-1000 type only.

  8. Integrated risk assessment for multi-unit NPP sites—A comparison

    International Nuclear Information System (INIS)

    Kumar, C. Senthil; Hassija, Varun; Velusamy, K.; Balasubramaniyan, V.

    2015-01-01

    Highlights: • Framework for integrated risk assessment for multi-unit NPP sites. • Categorization of external and internal events. • Modelling of key issues: mission time, cliff-edge, common cause failures, etc. • Safety goals for multi-unit NPP sites. • Comparison of site core damage frequency in one, two, three and four unit sites. - Abstract: Most of the nuclear power producing sites in the world houses multiple units. Such sites are faced with hazards generated from external events: earthquake, tsunami, flood, etc. and can threaten the safety of nuclear power plants. Further, risk from a multiple unit site and its impact on the public and environment was evident during the Fukushima nuclear disaster in March 2011. It is therefore important to evolve a methodology to systematically assess the risk from multi-unit site. For a single unit site, probabilistic risk assessment technique identifies the potential accident scenarios, their consequences, and estimates the core damage frequency that arise due to internal and external hazards. This challenging task becomes even more complex for a multiple unit site, especially when the external hazards that has the potential to generate one or more correlated hazards or a combination of non-correlated hazards are to be modelled. This paper presents an approach to evaluate risk for multiple NPP sites and also compare the risk for sites housing single, double and multiple nuclear plants.

  9. Integrated risk assessment for multi-unit NPP sites—A comparison

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, C. Senthil, E-mail: cskumar@igcar.gov.in [AERB-Safety Research Institute, Kalpakkam (India); Hassija, Varun; Velusamy, K. [Reactor Design Group, Indira Gandhi Centre for Atomic Research, Kalpakkam (India); Balasubramaniyan, V. [AERB-Safety Research Institute, Kalpakkam (India)

    2015-11-15

    Highlights: • Framework for integrated risk assessment for multi-unit NPP sites. • Categorization of external and internal events. • Modelling of key issues: mission time, cliff-edge, common cause failures, etc. • Safety goals for multi-unit NPP sites. • Comparison of site core damage frequency in one, two, three and four unit sites. - Abstract: Most of the nuclear power producing sites in the world houses multiple units. Such sites are faced with hazards generated from external events: earthquake, tsunami, flood, etc. and can threaten the safety of nuclear power plants. Further, risk from a multiple unit site and its impact on the public and environment was evident during the Fukushima nuclear disaster in March 2011. It is therefore important to evolve a methodology to systematically assess the risk from multi-unit site. For a single unit site, probabilistic risk assessment technique identifies the potential accident scenarios, their consequences, and estimates the core damage frequency that arise due to internal and external hazards. This challenging task becomes even more complex for a multiple unit site, especially when the external hazards that has the potential to generate one or more correlated hazards or a combination of non-correlated hazards are to be modelled. This paper presents an approach to evaluate risk for multiple NPP sites and also compare the risk for sites housing single, double and multiple nuclear plants.

  10. Full scale dynamic testing of Kozloduy NPP unit 5 structures

    International Nuclear Information System (INIS)

    Da Rin, E.M.

    1999-01-01

    As described in this report, the Kozloduy NPP western site has been subjected to low level earthquake-like ground shaking - through appropriately devised underground explosions - and the resulting dynamic response of the NPP reactor Unit 5 important structures appropriately measured and digitally recorded. In-situ free-field response was measured concurrently more than 100 m aside the main structures of interest. The collected experimental data provide reference information on the actual dynamic characteristics of the Kozloduy NPPs main structures, as well as give some useful indications on the dynamic soil-structure interaction effects for the case of low level excitation. Performing the present full-scale dynamic structural testing activities took advantage of the experience gained by ISMES during similar tests, lately performed in Italy and abroad (in particular, at the Paks NPP in 1994). The IAEA promoted dynamic testing of the Kozloduy NPP Unit 5 by means of pertinently designed buried explosion-induced ground motions which has provided a large amount of data on the dynamic structural response of its major structures. In the present report, the conducted investigation is described and the acquired digital data presented. A series of preliminary analyses were undertaken for examining in detail the ground excitation levels that were produced by these weak earthquake simulation experiments, as well as for inferring some structural characteristics and behaviour information from the collected data. These analyses ascertained the high quality of the collected digital data. Presumably due to soil-structure dynamic interaction effects, reduced excitation levels were observed at the reactor building foundation raft level with respect to the concurrent free-field ground motions. measured at a 140 m distance from the reactor building centre. Further more detailed and systematic analyses are worthwhile to be performed for extracting more complete information about the

  11. Analysis of 14C level around Qinshan NPP base

    International Nuclear Information System (INIS)

    Huang Renjie; Liang Haiyan; Chen Qianyuan; Ni Shiying; He Jun; Zeng Guangjian; Ma Yongfu

    2012-01-01

    By using the method of alkaline solution absorption, the activity concentrations of Carbon-14 as well as its variation tendency in air and biological samples were analyzed. The air samples and biological samples were collected around the Qinshan nuclear power plant base (Qinshan NPP Base) in 2002 to 2009 and 2007 to 2009 respectively. The results showed that, since 2002, the annual average activity concentrations of Carbon-14 in air samples were in the range of 38.3 mBq/m 3 to 55.4 mBq/m 3 . Although the monitoring results of Xiajiawan village and Yanliucun village were comparatively higher than the reference site in Hangzhou City, the results were still at the same level. Meanwhile, monitoring results of Xiajiawan village and Yangliucun village in the summer of 2004 and 2005 are relatively high, with the peak value of 55.4 mBq/m 3 appeared in Xiajiawan village during the summer of 2005. Correspondingly the annual airborne Carbon-14 of 2004 and 2005 discharged from the Qinshan NPP 3 rd Phase were higher than normal as well, it can therefore be concluded that the activity concentration of Carbon-14 around the Qinshan NPP Base are related to the discharged source term. The activity concentration of Carbon-14 in rice and leaf vegetable samples from Xiajiawan village and Yangliucun village were slightly higher, but within the same level, than that of Hangzhou. The activity concentration of Carbon-14 in the mullet samples collected from the sea area around Qinshan NPP Base are approximately the same with the sea area of Zhoushan. (authors)

  12. Does climate directly influence NPP globally?

    Science.gov (United States)

    Chu, Chengjin; Bartlett, Megan; Wang, Youshi; He, Fangliang; Weiner, Jacob; Chave, Jérôme; Sack, Lawren

    2016-01-01

    The need for rigorous analyses of climate impacts has never been more crucial. Current textbooks state that climate directly influences ecosystem annual net primary productivity (NPP), emphasizing the urgent need to monitor the impacts of climate change. A recent paper challenged this consensus, arguing, based on an analysis of NPP for 1247 woody plant communities across global climate gradients, that temperature and precipitation have negligible direct effects on NPP and only perhaps have indirect effects by constraining total stand biomass (Mtot ) and stand age (a). The authors of that study concluded that the length of the growing season (lgs ) might have a minor influence on NPP, an effect they considered not to be directly related to climate. In this article, we describe flaws that affected that study's conclusions and present novel analyses to disentangle the effects of stand variables and climate in determining NPP. We re-analyzed the same database to partition the direct and indirect effects of climate on NPP, using three approaches: maximum-likelihood model selection, independent-effects analysis, and structural equation modeling. These new analyses showed that about half of the global variation in NPP could be explained by Mtot combined with climate variables and supported strong and direct influences of climate independently of Mtot , both for NPP and for net biomass change averaged across the known lifetime of the stands (ABC = average biomass change). We show that lgs is an important climate variable, intrinsically correlated with, and contributing to mean annual temperature and precipitation (Tann and Pann ), all important climatic drivers of NPP. Our analyses provide guidance for statistical and mechanistic analyses of climate drivers of ecosystem processes for predictive modeling and provide novel evidence supporting the strong, direct role of climate in determining vegetation productivity at the global scale. © 2015 John Wiley & Sons Ltd.

  13. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2009-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  14. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2008-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  15. Study on human factor at NPP

    International Nuclear Information System (INIS)

    Nopp, I.

    1984-01-01

    Factors affecting the reliabilty of the reactor control by an NPP operator are considered on the base of the Czechoslovakia NPP operating experience. The reliability level of NPP operators depends on objective factors (conditions and regime of labour) determining the labour productivity and on subjective ones (psychological morale, physical and mental abilities and occupational level of personnel). Problems of the effect of physical and mental abilities and professional level on the reliability of personnel are considered to be the most important ones. The effect of individual abilities and specific features of the human body on changes in his occupational abilities can be estimated only to a certain degree

  16. Inspection Qualification Centre in NPP 'Kozloduy'

    International Nuclear Information System (INIS)

    Mikhovski, M.

    2000-01-01

    In May 1999 according to the working plan of the IAEA project RER 4/020 and the decision of the NPP the Inspection Qualification Centre (IQC) has been established in order to provide examination services in the NPP. During year 1999 IVC (AEA Technology) in the framework of the DTI project provides consulting and technical assistance to the NPP, IQC, Bulgarian Academy of Sciences and Regulatory Authorities in setting up the IQC infrastructure. Now IQC work as an independent inspection body B type. The IQC activities for the period 1999-2000 are presented and further tasks are outlined

  17. A brief overview of Ignalina NPP safety issues

    International Nuclear Information System (INIS)

    Almenas, K.; Ushpuras, E.

    1998-01-01

    A description of the safety of Ignalina NPP in a very popular form is presented. Answers to the most frequently recurring questions concerning the Ignalina NPP are provided based on recently completed international studies. Questions are like these: can a similar accident to the one that occurred in Chernobyl take place at Ignalina NPP, does the Ignalina NPP have a containment, what are the probabilities and potential consequences of accidents, etc. The brochure contains a short description of Ignalina NPP safety improvement programs

  18. Experience Practices on Decontamination Activity in NPP Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Suk Bon; Kim, Jeongju; Sohn, Wook [Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning of a nuclear power plant (NPP) involves various technical and administrative activities for a utility to terminate its license, which allows the plant site to be released from the regulatory control (site release). Decontamination activity in NPP decommissioning is one of the main technical activities to be performed during the decommissioning. The decontamination at decommissioning sites is usually performed due to several reasons such as reducing personnel dose and disposal costs, and cleanup to meet license termination requirements by using physical or chemical removal techniques proven through the previous experience practices. This paper introduces the best and worst practices for the decontamination activities collected from the decommissioning operational experiences through the implementation of nuclear decommissioning projects around the world. Review of the experiences of decontamination shows that it is important to conduct an advanced planning for optimized implementation of decontamination taking into considering site specific conditions such as operating time, reactor type, system, and so on. Also, a review of newer decontamination methods is necessary to safely and economically decommission the nuclear facility.

  19. Treatment of NPP wastes using vitrification

    International Nuclear Information System (INIS)

    Sobolev, I.A.; Lifanov, F.A.; Stefanovsky, S.V.; Kobelev, A.P.; Savkin, A.E.; Kornev, V.I.

    1998-01-01

    Glass-based materials to immobilize various liquid and solid radioactive wastes generated at nuclear power plants (NPP) were designed. Glassy waste forms can be produced using electric melting including a cold crucible melting. Leach rate of cesium was found to be 10 -5 -10 -6 g/(cm 2 day) (IAEA technique). Volume reduction factor after vitrification reached 4-5. Various technologies for NPP waste vitrification were developed. Direct vitrification means feeding of source waste into the melter with formation of glassy waste form to be disposed. Joule heated ceramic melter, and cold crucible were tested. Process variables at treatment of Kursk, Chernobyl (RBMK), Kalinin, Novovoronezh (VVER) NPP wastes were determined. The most promising melter was found to be the cold crucible. Pilot plant based on the cold crucibles has been designed and constructed. Solid burnable NPP wastes are incinerated and slags are incorporated in glass. (author)

  20. Environmental impact assessment of NPP decommissioning

    International Nuclear Information System (INIS)

    Hinca, R.

    2009-01-01

    In this presentation the following potential impacts of decommissioning of NPP are discussed: - Impacts on population; Impacts on natural environment; Land impacts; Impacts on urban complex and land utilisation; Possible impacts on area as a result of failure.

  1. Radiation ecological monitoring in NPP region

    International Nuclear Information System (INIS)

    Egorov, Yu.A.; Kazakov, S.V.

    1985-01-01

    The known principle of sanitary-hygienic regulation of NPP radiation effect on man and environment is analyzed. An ecological approach is required to optimize NPP relations with the environment and to regulate radioactivity of the NPP - environment system. The ecological approach envisages the development of standards of permissible concentrations of radioactive and chemical substances (as well as heat) in natural environment, taking into account their synergism, corresponding to ecologically permissible response reactions of biota to their effect. The ecological approach also comprises the sanitary-hygienic principle of radiation protection of man. Attention is paid to ecological monitoring in NPP region, comprising consideration of factors, affecting the environment, evaluation of the actual state of the environment, prediction of the environmental state, evaluation of the expected environmental state

  2. NPP operation and modern high technologies

    International Nuclear Information System (INIS)

    Kuznetsov, V.V.

    1992-01-01

    Examples are considered of modern high technology introduction into daily practice of NPP operation, namely: satellite communication systems, robots, non-destructive testing, optical-fiber techniques, laser measuring means and others

  3. Krsko NPP Periodic Safety Review program

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  4. NPP A-1 decommissioning - Phase I

    International Nuclear Information System (INIS)

    Krstenik, A.; Blazek, J.

    2000-01-01

    Nuclear power plant A-1 with output 150 MW e , with metallic natural uranium fuelled, CO 2 cooled and heavy water moderated reactor had been prematurely finally shut down in 1977. It is necessary to mention that neither operator nor regulatory and other authorities have been prepared for the solution of such situation. During next two consecutive years after shutdown main effort of operator focused on technical and administrative activities which are described in the previous paper together with approach, condition and constraints for NPP A-1 decommissioning as well as the work and research carried out up to the development and approval of the Project for NPP A-1 decommissioning - I. phase. Subject of this paper is description of: (1) An approach to NPP A -1 decommissioning; (2) An approach to development of the project for NPP A-1 decommissioning; (3) Project - tasks, scope, objectives; (4) Mode of the Project realisation; (5) Progress achieved up to the 1999 year. (authors)

  5. Nuclear Power Plant (NPP) safety in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    The multidisciplinary aspects of the activities involved in the nuclear power plant (NPP) licensing, are presented. The activities of CNEN's technical staff in the licensing of Angra-1 and Angra-2 power plants are shown. (E.G.) [pt

  6. Training human resource for NPP in Vietnam

    International Nuclear Information System (INIS)

    Nguyen, Trung Tinh; Dam, Xuan Hiep

    2008-01-01

    Vietnam will establish the first NPP in the near future. With us the first important thing is the human resource, but now there is no university in Vietnam training nuclear engineers. In EPU (Electric Power University), now we are preparing for training nuclear engineers. In this paper, we review the nuclear man power and the way to train the high quality human resource for NPP and for other nuclear application in Vietnam. (author)

  7. Ignalina NPP Safety Analysis: Models and Results

    International Nuclear Information System (INIS)

    Uspuras, E.

    1999-01-01

    Research directions, linked to safety assessment of the Ignalina NPP, of the scientific safety analysis group are presented: Thermal-hydraulic analysis of accidents and operational transients; Thermal-hydraulic assessment of Ignalina NPP Accident Localization System and other compartments; Structural analysis of plant components, piping and other parts of Main Circulation Circuit; Assessment of RBMK-1500 reactor core and other. Models and main works carried out last year are described. (author)

  8. Heat delivery from Bohunice NPP, Slovakia

    International Nuclear Information System (INIS)

    Paley, I.

    1998-01-01

    Experience with nuclear district heating in the Slovak Republic is reported. The heating system of the town of Trnava is supplied by the Bohunice NPP and conventional sources. Construction of the hot water heating system from the Bohunice NPP began in 1983. Commercial operation began on 10 December 1987. Heat delivery has gradually increased from 478 TJ in 1988, to 1,104 TJ in 1995. The heat cost is low, resulting in an increasing number of consumers. (author)

  9. Knowledge Management and Organizational Proficiency with NPP

    International Nuclear Information System (INIS)

    Marler, M.

    2016-01-01

    Full text: The pace of new NPP construction, startup, and operation is straining the supply of proficient operators, technicians, and engineers. This technical brief explains an approach implemented by a US nuclear utility to capture and transfer knowledge possessed by proficient workers to new workers using the VISION learning content management system. This approach could also be used to accelerate worker proficiency in new NPP organizations. (author

  10. Study on increasing spent fuel storage capacity at Juragua NPP

    International Nuclear Information System (INIS)

    Guerra Valdes, R.; Lopez Aldama, D.; Rodriguez Gual, M.; Garcia Yip, F.

    1999-01-01

    The delay in decision about the final disposal of the spent fuel, led to longer interim storage. The reracking og the storage pools was an economical and feasible option to increase the storage capacity on the site. Reracking of the storage facility led to the analysis of the new conditions for criticality, shielding, residual heat removal and mechanical loads over the structures. This paper includes a summary of the studies on criticality and dose rate changes in the vicinity of the storage pool of Juragua NPP

  11. Managing RTP Console Upgrading Project: Best Practice for Nuclear Malaysia as TSO in Supporting NPP Development

    International Nuclear Information System (INIS)

    Nurfarhana Ayuni Joha; Syahirah Abdul Rahman; Izhar Abu Hussin

    2011-01-01

    Human Resource Development (HRD) is required for Nuclear Power Programme (NPP). To be a Technical Support Organisation (TSO) for NPP, Nuclear Malaysia should be ready to take the responsibility in supporting Nuclear Regulatory Agency (NRA) and NPP Operators. In nurturing Nuclear Malaysia as TSO, the prime important and focus of HRD for the NPP is the reactor engineering technology. Nuclear Malaysia gives various phases of supports needed to build NPP such as during siting, design, planning, licensing, construction, commissioning, operation and maintenance in its own way and capability. The current Nuclear Malaysia unique approach is the TRIGA PUSPATI reactor (RTP) upgrading project. Research reactor plays an important role in Research and Developpement organization as a nuclear facility to assist the development of NPP. Therefore, upgrading the research reactor is needed to build the skills and gain knowledge of workers to work safely. After 29 years of operation, the RTP system is facing aging problems due to many components in the reactor are outdated. Therefore, immediate action should be carried out to mitigate the aging factor of the reactor to prevent the worsening of the aging problem, and to prevent untoward incident from happening. Action should also cover short and long term planning to prevent current situation from recurring. Currently, RTP is upgrading its console from analog to digital system. One of the achievements in this console upgrading project is the development and implementation of project management. This paper comprises the overview on the RTP console upgrading project, the project management and how this project can lead Nuclear Malaysia to be a good TSO for the development of NPP. (author)

  12. Vandellos 1 NPP decommissioning feedback experience

    International Nuclear Information System (INIS)

    Fernandez, Rodriguez A.

    2003-01-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  13. Vandellos 1 NPP decommissioning feedback experience

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Rodriguez A. [Empresa Nacional de Residuos Radioactivos, ENPRESA, Madrid (Spain)

    2003-07-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  14. Methodology transfer for the preparation of NPP decommissioning for leading personnel of the Ignalina NPP and for the representatives of Lithuanian authorities

    International Nuclear Information System (INIS)

    Ackermann, L.; Baecker, A.

    2004-01-01

    At request of the Lithuanian government to receive support for the preparation of the decommissioning of Ignalina NPP, a bilateral project was financed by the German federal government to transfer experience from the decommissioning of the Greifswald and Rheinsberg NPPs to the management staff of the Ignalina NPP and to the representatives of the Lithuanian authorities in charge of the decommissioning. The methodology transfer project was prepared and carried out under the leadership of the Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH. The practical implementation was within the responsibility of Energiewerke Nord GmbH (EWN) in cooperation with other German subcontractors. The methodology transfer comprised the task fields of project management, project planning, licensing procedure and waste management as well as social aspects of the further development of the industrial site. Five intensive one-week seminars were conducted mainly at the Greifswald NPP site and the knowledge gained was then consolidated in two evaluation seminars at the Ignalina NPP. As the basis for the training realised in 2002 and 2003, EWN provided about 2000 power-point illustrations, more than 200 transparencies and four video films. The training handouts produced by EWN were delivered to the seminar participants in Russian and English language and documented in the database ''Technische Dokumentation Ost'' (DOKU OST) of GRS. (orig.)

  15. Suomi NPP Ground System Performance

    Science.gov (United States)

    Grant, K. D.; Bergeron, C.

    2013-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). JPSS will replace the afternoon orbit component and ground processing system of the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA. The JPSS satellites will carry a suite of sensors designed to collect meteorological, oceanographic, climatological and geophysical observations of the Earth. The first satellite in the JPSS constellation, known as the Suomi National Polar-orbiting Partnership (Suomi NPP) satellite, was launched on 28 October 2011, and is currently undergoing product calibration and validation activities. As products reach a beta level of maturity, they are made available to the community through NOAA's Comprehensive Large Array-data Stewardship System (CLASS). CGS's data processing capability processes the satellite data from the Joint Polar Satellite System satellites to provide environmental data products (including Sensor Data Records (SDRs) and Environmental Data Records (EDRs)) to NOAA and Department of Defense (DoD) processing centers operated by the United States government. CGS is currently processing and delivering SDRs and EDRs for Suomi NPP and will continue through the lifetime of the Joint Polar Satellite System programs. Following the launch and sensor activation phase of the Suomi NPP mission, full volume data traffic is now flowing from the satellite through CGS's C3, data processing, and data delivery systems. Ground system performance is critical for this operational system. As part of early system checkout, Raytheon measured all aspects of data acquisition, routing, processing, and delivery to ensure operational performance requirements are met, and will continue to be met throughout the mission. Raytheon developed a tool to measure, categorize, and

  16. Comparison of Chinese criteria for intervention in NPP emergency exposure situations with IAEA guideline

    International Nuclear Information System (INIS)

    Yu Hong; Liu Yongmei

    2015-01-01

    The Chinese criteria for protective action, intervention level, operational intervention level and off-site emergency zones are compared with IAEA guideline in the paper. The suggestions are put forward to implement the intervention in Chinese NPP emergency exposure situations. (authors)

  17. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  18. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  19. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  20. Checking of seismic and tsunami hazard for coastal NPP of Chinese continent after Fukushima nuclear accident

    Institute of Scientific and Technical Information of China (English)

    Chang Xiangdong; Zhou Bengang; Zhao Lianda

    2013-01-01

    A checking on seismic and tsunami hazard for coastal nuclear power plant (NPP) of Chinese continent has been made after Japanese Fukushima nuclear accident caused by earthquake tsunami.The results of the checking are introduced briefly in this paper,including the evaluations of seismic and tsunami hazard in NPP siting period,checking results on seismic and tsunami hazard.Because Chinese coastal area belongs to the continental shelf and far from the boundary of plate collision,the tsunami hazard is not significant for coastal area of Chinese continent.However,the effect from tsunami still can' t be excluded absolutely since calculated result of Manila trench tsunami source although the tsunami wave is lower than water level from storm surge.The research about earthquake tsunami will continue in future.The tsunami warning system and emergency program of NPP will be established based on principle of defense in depth in China.

  1. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV; Especificacion de los requerimientos para tramitar una licencia de una instalacion independiente de almacenamiento temporal en seco de combustible gastado (ISFSI) en el sitio de la CNLV

    Energy Technology Data Exchange (ETDEWEB)

    Serrano R, M. L., E-mail: mlserrano@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Barragan 779, Col. Narvarte, 03020 Ciudad de Mexico (Mexico)

    2015-09-15

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  2. Decommissioning Study of Oskarshamn NPP

    International Nuclear Information System (INIS)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias

    2013-06-01

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding

  3. Decommissioning study of Forsmark NPP

    International Nuclear Information System (INIS)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias

    2013-06-01

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding

  4. ORSEC technological risks, Blayais NPP

    International Nuclear Information System (INIS)

    2016-01-01

    The Particular intervention plan (PPI in French) is an emergency plan which foresees the measures and means to be implemented to address the potential risks of the presence and operation of a nuclear facility. This plan is implemented and developed by the Prefect in case of nuclear accident (or incident leading to a potential accident), the impact of which extending beyond the facility perimeter. It represents a special section of the organisation plan for civil protection response (ORSEC plan). The PPI foresees the necessary measures and means for crisis management during the first hours following the accident and is triggered by the Department Prefect according to the information provided by the facility operator. Its aim is to protect the populations leaving within 10 km of the facility against a potential radiological hazard. The PPI describes: the facility, the intervention area, the protection measures for the population, the conditions of emergency plan triggering, the crisis organisation, the action forms of the different services, and the post-accident stage. This document is the public version of the Particular intervention plan of the Blayais NPP (Gironde, France)

  5. Decommissioning Study of Oskarshamn NPP

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  6. Decommissioning study of Forsmark NPP

    Energy Technology Data Exchange (ETDEWEB)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  7. Changing NPP consumption patterns in the Holocene: from Megafauna "liberated" NPP to "ecological bankruptcy"

    Science.gov (United States)

    Doughty, C.

    2015-12-01

    There have been vast changes in how net primary production (NPP) is consumed by humans and animals during the Holocene beginning with a potential increase in availability following the Pleistocene megafauna extinctions. This was followed by the development of agriculture which began to gradually restrict availability of NPP for wild animals. Finally, humans entered the industrial era using non-plant based energies to power societies. Here I ask the following questions about these three energy transitions: 1. How much NPP energy may have become available following the megafauna extinctions? 2. When did humans, through agriculture and domestic animals, consume more NPP than wild mammals in each country? 3. When did humans and wild mammals use more energy than was available in total NPP in each country? To answer this last question I calculate NPP consumed by wild animals, crops, livestock, and energy use (all converted to units of MJ) and compare this with the total potential NPP (also in MJ) for each country. We develop the term "ecological bankruptcy" to refer to the level of consumption where not all energy needs can be met by the country's NPP. Currently, 82 countries and a net population of 5.4 billion are in the state of ecologically bankruptcy, crossing this threshold at various times over the past 40 years. By contrast, only 52 countries with a net population of 1.2 billion remain ecologically solvent. Overall, the Holocene has seen remarkable changes in consumption patterns of NPP, passing through three distinct phases. Humans began in a world where there was 1.6-4.1% unclaimed NPP to consume. From 1700-1850, humans began to consume more than wild animals (globally averaged). At present, >82% of people live in countries where not even all available plant matter could satisfy our energy demands.

  8. Accident management insights after the Fukushima Daiichi NPP accident

    International Nuclear Information System (INIS)

    Degueldre, Didier; Viktorov, Alexandre; Tuomainen, Minna; Ducamp, Francois; Chevalier, Sophie; Guigueno, Yves; Tasset, Daniel; Heinrich, Marcus; Schneider, Matthias; Funahashi, Toshihiro; Hotta, Akitoshi; Kajimoto, Mitsuhiro; Chung, Dae-Wook; Kuriene, Laima; Kozlova, Nadezhda; Zivko, Tomi; Aleza, Santiago; Jones, John; McHale, Jack; Nieh, Ho; Pascal, Ghislain; ); Nakoski, John; Neretin, Victor; Nezuka, Takayoshi; )

    2014-01-01

    The Fukushima Daiichi nuclear power plant (NPP) accident, that took place on 11 March 2011, initiated a significant number of activities at the national and international levels to reassess the safety of existing NPPs, evaluate the sufficiency of technical means and administrative measures available for emergency response, and develop recommendations for increasing the robustness of NPPs to withstand extreme external events and beyond design basis accidents. The OECD Nuclear Energy Agency (NEA) is working closely with its member and partner countries to examine the causes of the accident and to identify lessons learnt with a view to the appropriate follow-up actions to be taken by the nuclear safety community. Accident management is a priority area of work for the NEA to address lessons being learnt from the accident at the Fukushima Daiichi NPP following the recommendations of Committee on Nuclear Regulatory Activities (CNRA), Committee on the Safety of Nuclear Installations (CSNI), and Committee on Radiation Protection and Public Health (CRPPH). Considering the importance of these issues, the CNRA authorised the formation of a task group on accident management (TGAM) in June 2012 to review the regulatory framework for accident management following the Fukushima Daiichi NPP accident. The task group was requested to assess the NEA member countries needs and challenges in light of the accident from a regulatory point of view. The general objectives of the TGAM review were to consider: - enhancements of on-site accident management procedures and guidelines based on lessons learnt from the Fukushima Daiichi NPP accident; - decision-making and guiding principles in emergency situations; - guidance for instrumentation, equipment and supplies for addressing long-term aspects of accident management; - guidance and implementation when taking extreme measures for accident management. The report is built on the existing bases for capabilities to respond to design basis

  9. Construction and mounting technology of NPP in France

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    Principal peculiarities of construction sequence of building 1300 MW(e) single-unit NPPs in France are described. A NPP is housed in a two-layer containment building with 1.5% leakage of medium per day. The internal shell, 900 mm thich, is made of prestressed reinforced concrete; the external shell is made of reinforced concrete. The sequence and organizing of concrete operations using concrete pumps with capacity of 50 m 3 /h, concrete distributors ensuring concrete delivery to a distance of 46 m and belt conveyers assuring 80-100 m 3 /h concrete placing are described. A concrete plant of 120-180 μ 3 /h productive capacity equipped with a system for computerized automatic programming of the mixture composition is built to provide concrete mixture for NPP construction sites. The workshops are developed at the construction site to fabricate concrete structures with specific reinforcement consumption up to 250 kg/m 3 . The reinforcement is assembled with the use of special pipe couplings, welding of reinforcement is prohibited. Enlarged reinforced concrete blocks sized up to 250 t are employed to reduce the construction terms and to improve the quality of work

  10. Automatic control system at the ''Loviisa'' NPP

    International Nuclear Information System (INIS)

    Kukhtevich, I.V.; Mal'tsev, B.K.; Sergievskaya, E.N.

    1980-01-01

    Automatic control system of the Loviisa-1 NPP (Finland) is described. According to operation conditions of Finland power system the Loviisa-1 NPP must operate in the mode of week and day control of loading schedule and participate in current control of power system frequency and capacity. With provision for these requirements NPP is equipped with the all-regime system for automatic control functioning during reactor start-up, shut-down, in normal and transient regimes and in emergency situations. The automatic control system includes: a data subsystem, an automatic control subsystem, a discrete control subsystem including remote, a subsystem for reactor control and protection and overall station system of protections: control and dosimetry inside the reactor. Structures of a data-computer complex, discrete control subsystems, reactor control and protection systems, neutron flux control system, inside-reactor control system, station protection system and system for control of fuel element tightness are presented in short. Two-year experience of the NPP operation confirmed advisability of the chosen volume of automatization. The Loviisa-1 NPP operates successfully in the mode of the week and day control of supervisor schedule and current control of frequency (short-term control)

  11. Environmental impact of the NPP Krsko

    International Nuclear Information System (INIS)

    Novosel, N.

    1996-01-01

    The Ministry of Economic Affairs has for six years now been monitoring the operation of the Krsko NPP (NEK) and its impact on the environment. A bulletin titled 'NEK - Energy and Environment' is being issued every three months. It contains information on operation of the Krsko NPP for the previous three months, a graph of duration of temperature increase of water in the Sava river (delta T) in that period, an assessment of the radiological impact of Krsko NPP on the environment through an equivalent dose cumulatively throughout the calendar year, and a short current text related to Krsko NPP. The Ministry of Economic Affairs organizes a press conference on every issue of the bulletin, as an attempt of introducing this subject to the media and to the public. This paper contains a review of information given in the NEK bulletin from 1990 to 1995 with a special emphasis on the contribution of the Krsko NPP to the artificially caused radiation on the border between the Republic of croatia and the Republic of Slovenia. (author)

  12. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  13. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Stuller, J.; Brandejs, P.; Miasnikov, A.; Svab, M.

    1999-01-01

    In beginning, a history of legislative process regulating industrial utilisation of nuclear energy is given, including detailed list of decrees issued by the first regulatory body supervising Czech nuclear installations - Czechoslovak Atomic Energy Commission (CSKAE). Current status of nuclear regulations and radiation protection, especially in connection with Atomic Act (Act No 18/1997 Coll.), is described. The Atomic Act transfers into the Czech legal system a number of obligations following from the Vienna Convention on Civil Liability for Nuclear Damage and Joint Protocol relating to the Application of the Vienna and Paris Convention, to which the Czech Republic had acceded. Actual duties and competence of current nuclear regulatory body - State Office for Nuclear Safety (SUJB) - are given in detail. Execution of the State supervision of peaceful utilisation of nuclear energy and ionising radiation is laid out in several articles of the Act, which comprises: control activities of the SUJB, remedial measures, penalties. Material and human resources are sufficient for fulfilment of the basic functions for which SUJB is authorised by the law. For 1998, the SUJB allotted staff of 149, approximately 2/3 of that number are nuclear safety and radiation protection inspectors. The SUJB budget for 1998 is approximately 180 million Czech crowns (roughly 6 million US dollars). Inspection activity of SUJB is carried out in three different ways: routine inspections, planned specialised inspections, inspections as a response to a certain situation (ad-hoc inspections). Approach to the licensing of major plant upgrades and backfittings are mainly illustrated on the Temelin NPP licensing. Regulatory position and practices concerning review activities are presented. (author)

  14. Research on the NPP human factors engineering operating experience review

    International Nuclear Information System (INIS)

    Ren Xiangchen; Miao Hongxing; Ning Zhonghe

    2006-01-01

    This paper addresses the importance of the human factors engineering (HFE) for the design of nuclear power plant (NPP), especially for the design of human-machine interface in the NPP. It also summarizes the scope and content of the NPP HFE. The function, scope, content and process of the NPP human factors engineering operating experience review (OER) are mainly focused on, and significantly discussed. Finally, it briefly introduces the situation of the studies on the OER in China. (authors)

  15. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  16. New trends in designing NPP control boards

    International Nuclear Information System (INIS)

    Kondrat'ev, V.V.

    1981-01-01

    A short analytical summary of the latest developments and future trends in designing NPP control boards is given. The designs of the Westinghause and the Hynkley-Point NPP control boards are described in detail. The essence of the advanced control board concept consists , firstly, in expanded use of computer-controlled displays for the sake of reducing the content of unimportant information presented to an operator, and, secondary, in better account of human possibilities to convert the NPP operation information into a more suitable form. An enlarged use of the direct digital reactor control utilizing microprocessors is expected. Besides, the employment of full-scale control board mock-ups and information desks as well as testing newly-developed control boards at computer reactor simulators are concluded to be used at all-growing rate [ru

  17. Qinshan NPP large break LOCA safety analysis

    International Nuclear Information System (INIS)

    Shi Guobao; Tang Jiahuan; Zhou Quanfu; Wang Yangding

    1997-01-01

    Qinshan NPP is the first nuclear power plant in the mainland of China, a 300 MW(e) two-loop PWR. Large break LOCA is the design-basis accident of Qinshan NPP. Based on available computer codes, the own analysis method which complies with Appendix k of 10 CFR 50 has been established. The RELAP4/MOD7 code is employed for the calculations of blowdown, refill and reflood phase of the RCS respectively. The CONTEMPT-LT/028 code is used for the containment pressure and temperature analysis. The temperature transient in the hot rod is calculated using the FRAP-6T code. Conservative initial and functional assumptions were adopted during Qinshan NPP large break LOCA analysis. The results of the analysis show the applicable acceptance criteria for the loss-of-coolant accident are met

  18. Perspectives of NPP personnel training in the future?

    International Nuclear Information System (INIS)

    Khess, R.E.

    1996-01-01

    Problems of the NPP personnel education are discussed during radical reorganization of the state regulation of energy production and distribution when nuclear energetics will appears in the market conditions. Effective methods of the NPP personnel training developed by the corporation GPU Nuclear are given. Potentials of the application of simulators and computerized programs for increasing the NPP personnel education efficiency are considered

  19. Current status of Chernobyl NPP decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Strategy of Chernobyl NPP decommissioning with the decommissioning license 2002-2064 is presented. The main activities at the stage of ChNPP units shutdown (2002 - 2012) are: units maintenance in safe state; decommissioning infrastructure construction; unloading of SNF – main activity determining the stage duration; systems and elements final shutdown; decommissioning life-support systems reconstruction; Comprehensive engineering and radiation survey (CERS); dismantling of the reactor facilities external equipment; removal of RAW from units; decommissioning documentation development. The decommissioning activities main results are presented

  20. Radioactive waste problems in the Kozloduy NPP

    International Nuclear Information System (INIS)

    Videnov, N.; Stanchev, V.

    1995-01-01

    An average volume of 1400 m 3 a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed

  1. NPP Krsko natural circulation performance evaluation

    International Nuclear Information System (INIS)

    Segon, Velimir; Bajs, Tomislav; Frogheri, Monica

    1999-01-01

    The present document deals with an evaluation of the natural circulation performance of the Krsko nuclear power plant. Two calculation have been performed using the NPP Krsko nodalization (both similar to the LOBI A2-77 natural circulation experiment) - the first with the present steam generators at NPP Krsko (Westinghouse, 18% plugged), the second with the future steam generators (Siemens, 0% plugged). The results were evaluated using the natural circulation flow map derived in /1/, and were compared to evaluate the influence of the new steam generators on the natural circulation performance. (author)

  2. Radioactive waste problems in the Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Videnov, N; Stanchev, V [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1996-12-31

    An average volume of 1400 m{sup 3} a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed.

  3. Medical consequences of NPP and TPP operation

    International Nuclear Information System (INIS)

    Bliznakov, V.

    1996-01-01

    Results from a comparative analysis of health conditions of the staff in the Kozloduy NPP and the Maritsa Iztok TPP are reported. It is found that the general disease incidence with temporary incapacity for work of Kozloduy workers is lower than those data for the workers at thermal power stations. The incidence of some social diseases like neoplasms, TBC, hypertension, ischemia etc. is also lower for the staff of NPP. No cases of radiation injuries have been registered for a period of 21 years

  4. Nuclear fuel operation at Balakovo NPP

    International Nuclear Information System (INIS)

    Morozov, A.

    2015-01-01

    The presentation addressed the positive experience of the TVS-2M assemblies implementation at Balakovo NPP in 18 month fuel cycles, at uprated power (104%) and the usage of the axial profiled Gd-rods in order to minimize the power peaking factors and linear heat rate in the upper part in some of the fuel rods. The results of the test operation of fuel rods with different claddings, made by E110M, E125 and E635M alloys at Balakovo NPP were also provided. The recently observed problem with the “white crust” on the cladding surfaces was also discussed

  5. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  6. Lifetime evaluation of Bohunice NPP components

    International Nuclear Information System (INIS)

    Kupca, L.

    2001-01-01

    The paper discuss some aspects of the main primary components lifetime evaluation program in Bohunice NPP which is performed by Nuclear Power Plant Research Institute (NPPRI) Trnava in cooperation with Bohunice and other organizations involved. Facts presented here are based on the NPPRI research report which is regularly issued after each reactor fuel campaign under conditions of project resulted from the contract between NPPRI and Bohunice NPP. For the calculations, there has been used some computer codes adapted (or made) by NPPRI and the results are just the conclusive and very brief, presented here in Tables (Figures). (authors)

  7. NPP Krsko small break LOCA analysis

    International Nuclear Information System (INIS)

    Mavko, B.; Petelin, S.; Peterlin, G.

    1987-01-01

    Parametric analysis of small break loss of coolant accident for the Krsko NPP was calculated by using RELAP5/MOD1 computer code. The model that was used in our calculations has been improved over several years and was previously tested in simulation (s) of start-up tests and known NPP Krsko transients. In our calculations we modelled automatic actions initiated by control, safety and protection systems. We also modelled the required operator actions as specified in emergency operating instructions. In small-break LOCA calculations, we varied break sizes in the cold leg. The influence of steam generator tube plugging on small break LOCA accidents was also analysed. (author)

  8. Activity level of gross α and gross β in airborne aerosol samples around the Qinshan NPP

    International Nuclear Information System (INIS)

    Chen Bin; Ye Jida; Chen Qianyuan; Wu Xiaofei; Song Weili; Wang Hongfeng

    2007-01-01

    The monitoring results of gross α and gross 13 activity from 2001 to 2005 for environmental airborne aerosol samples around the Qinshan NPP base are presented in this paper. A total of 170 aerosol samples were collected from monitoring sites of Caichenmen village, Qinlian village, Xiajiawan village and Yangliucun village around the Qinshan NPP base. The measured specific activity of gross α and gross β are in the range of 0.02-0.38 mBq/m 3 and 0.10-1.81 mBq/m 3 , respectively, with an average of 0.11 mBq/m 3 and 0.45mBq/m 3 , respectively. They are lower than the average of 0.15 mBq/m 3 and 0.52 mBq/m 3 , of reference site at Hangzhou City. It is indicated that the specific activity of gross α and gross β for environmental aerosol samples around the Qinshan NPP base had not been increased in normal operating conditions of the NPP. (authors)

  9. New ICRP recommendations and radiation safety of an NPP

    International Nuclear Information System (INIS)

    Janzekovic, H.

    2007-01-01

    In March 2007 the fundamental radiation protection recommendations used world-widely in nuclear facilities were approved by the ICRP. Implementation of radiation safety standards in an NPP is a challenging issue related to all NPP phases from planning a site and its design to its decommissioning also because if neglected it could be very difficult if not impossible to implement improvement of radiation safety later during operation or decommissioning without a substantial cost. The standards are changing with a period of 15 years which is small regarding a prolonged lifetime of many NPPs and also foreseen lifetime of new NPPs, i.e. 60 years. The new recommendations are actually an upgrading of the ICRP 60. Among other changes new sets of wR and wT are given, as well as an update of around 50 different values related to doses. Two new concepts are also tackled i.e. terrorist attacks and protection of the environment. The influence of the new recommendations on the radiation safety of NPPs can be analysed by a selection of four renewed or new concepts: types of exposure situation, dose constraints, source-related approach and safety and security. Their implementation could lead to upgrading the radiation safety of future or existing NPPs as well as of decommissioning processes. Some of the concepts were already extensively and successfully used by designers of modifications or of new NPPs, as well as by operators. (author)

  10. External flood probabilistic safety analysis of a coastal NPP

    International Nuclear Information System (INIS)

    Pisharady, Ajai S.; Chakraborty, M.K.; Acharya, Sourav; Roshan, A.D.; Bishnoi, L.R.

    2015-01-01

    External events pose a definitive challenge to safety of NPP, solely due to their ability to induce common cause failures. Flooding incidents at Le Blayais NPP, France, Fort Calhoun NPP, USA and Fukushima Daiichi have pointed to the importance of external flooding as an important contributor to NPP risk. A methodology developed for external flood PSA of a coastal NPP vulnerable to flooding due to tsunami, cyclonic storm and intense local precipitation is presented in this paper. Different tasks for EFPSA has been identified along with general approach for completing each task

  11. Principles of tariff determination for NPP electric power generation

    International Nuclear Information System (INIS)

    Ratnikov, B.E.; Gitel'man, L.D.; Artemov, Yu.N.; Fiantsev, V.S.

    1988-01-01

    Foundations of price-setting and order of accounting arrangement for NPP electric power are considered. NPP tariffs are established proceeding from standard costs of power generation. The standards are differentiated as to NPP groups, depending on technical, regional and natural geographic factors, taking into account the facility type, unit capacity and the number of similar NPP units. The conclusion is made that under conditions of NPP economic independence expansion and creation of prerequisites for going over to self-financing principles and also due to the qualitatively new stage of nuclear power generation development the level of efficiency, forseen by the tariffs, should be increased

  12. Akkuyu NPP – the first Turkish NPP. The new history of the project

    International Nuclear Information System (INIS)

    Tzocheva, V.

    2012-01-01

    An overview is given to the Turkish energy sector and nuclear power plans. The project for the construction of the first NPP in Turkey is presented. The general parameters of the Project are: CAPEX: $ 20 bln; Project design: NPP-2006; (VVER- 1200); Number of units: 4; Total capacity: 4 800 MW; Construction period: 2014 – 2023; PPA period; 15 years, fixed price terms. An account of the activities during 2011, the Worley Parsons participation are presented and a tentative project schedule is given

  13. Radioactive source management in Daya Bay NPP

    International Nuclear Information System (INIS)

    Mao Chun Yang

    2000-01-01

    'Small sources causes big accidents' had occurred worldwide many times. Radioactive source management in Nuclear Power Plant in very important for its safety record. This paper introduces the way and experience of radioactive source management in Daya Bay NPP from aspects of clarifying the responsibilities, centralizing the management of high radioactivity sources, work process management and experience feedback etc. (author)

  14. Safety upgrading of Bohunice V1 NPP

    International Nuclear Information System (INIS)

    2001-01-01

    This CD is multimedia presentation of programme safety upgrading of Bohunice V1 NPP. It consist of next chapters: (1) Introductory speeches; (2) Nuclear power plant WWER 440; (3) Safety improvement; (4) Bohunice Nuclear power plants subsidiary; (5) Siemens; (6) REKON; (7) VUJE Trnava, Inc. - Engineering, Design and Research Organisation; (8) Album

  15. NPP Mochovce - a project of extraordinay significance

    International Nuclear Information System (INIS)

    Chwolik, I.; Debru, M.

    2000-01-01

    In this paper and in this presentation the reactor safety upgrading of two blocks of the NPP V-1 Bohunice, some results of participation on safety upgrading by the German-French consortium EUCOM (Framatome and Siemens-KWU) are presented. (author)

  16. Jose Cabrera NPP severe accident management activities

    International Nuclear Information System (INIS)

    Blanco, J.; Almeida, P.; Saiz, J.; Sastre, J.L.; Delgado, R.

    1998-01-01

    To prepare a common acting plan with respect to Severe Accident Management, in 1994 was founded the severe accident management ''ad-hoc'' working group from the Spanish Westinghouse PWR Nuclear Power Plant Owners Group. In this group actively collaborated the Jose Cabrera NPP Training Centre and the Department of Nuclear Engineering of UNION FENOSA. From this moment, Jose Cabrera NPP began the planning of its specific Severe Accident Management Program, which main point are Severe Accident Management Guidelines (SAMG). To elaborate this guidelines, the Spanish translation of Westinghouse Owners Group (WOG) Severe Accident Management Guidelines were considered the reference documents. The implementation of this Guidelines to Jose Cabrera NPP started on January 1997. Once the specific guidelines have been implemented to the plant, training activities for the personnel involved in severe accident issues will be developed. To prepare the training exercises MAAP4 code will be used, and with this intention, a specific Jose Cabrera NPP MAAP-GRAAPH screen has been developed. Furthermore, a wide selection of MAAP input files for the simulation of different scenarios and accidental events is available. (Author)

  17. Maintenance training centre at NPP Paks, Hungary

    International Nuclear Information System (INIS)

    Babos, K.

    1996-01-01

    The lecture shows the feature of WWER-440/213 units maintenance, the existing maintenance training system, the necessity of the change in maintenance training system at NPP Paks. The author introduces the would-be maintenance training centre, the training facilities and the main tasks related to the maintenance training. (author)

  18. Safety culture development at Daya Bay NPP

    International Nuclear Information System (INIS)

    Zhang Shanming

    2001-01-01

    From view on Organization Behavior theory, the concept, development and affecting factors of safety culture are introduced. The focuses are on the establishment, development and management practice for safety culture at Daya Bay NPP. A strong safety culture, also demonstrated, has contributed greatly to improving performance at Daya Bay

  19. Operational experiences feedback in Bohunice NPP

    Energy Technology Data Exchange (ETDEWEB)

    Betak, A [NPP Bohunice (Slovakia)

    1997-10-01

    The presentation reviews the following issues: OEF team in Bohunice NPP - structure; training and qualification: ASSET seminars on Prevention of incidents - INES manual handling, NRA-NRC the training on event investigation methods, NU - the training on HPES; legislation - documentation prepared in the frame of QA programme; results of OEF team activities; ASSET mission Dukovany - Experiences; the perspective activities.

  20. Development of the NPP Kozloduy informational system

    Energy Technology Data Exchange (ETDEWEB)

    Katsarov, Y; Manchev, B [Risk Engineering Ltd., Sofia (Bulgaria)

    1996-12-31

    A unified computer system to be implemented in the Kozloduy NPP is described. It allows to generate all general indicators and documents for plant operation needed according to the national regulation and WANO Performance Indicators. The system combines multi-purpose data collection with probabilistic analysis, evaluation of the human factor and optimization of the regulated verification of the equipment. 3 refs.

  1. NPP radioactive waste processing and solidification

    International Nuclear Information System (INIS)

    Nikiforov, A.S.; Polyakov, A.S.; Zakharova, K.P.

    1983-01-01

    The problems of proce-sing NPP intermediate level- and low-level liquid radioactive wastes (LRW) are considered. Various methods are compared of LWR solidification on the base of bituminization, cement grouting and inclusion into synthetic resins. It is concluded that the considered methods ensure radioactive radionuclides effluents into open hydronetwork at the level below the sanitary, standards

  2. Biotic elements of NPP techno-ecosystem

    International Nuclear Information System (INIS)

    Protasov, A.A.; Silaeva, A.A.

    2013-01-01

    Specific features of biotic elements in the NPP techno-ecosystems were considered and compared with natural ecosystems. Relationships between biotic communities and environmental factors that are specific to the techno-ecosystems were discussed, and the problems of limitation of biological hindrances in operation of equipment, principles of hydrobiological and environmental monitoring were considered.

  3. Development of NPP safety regulation in Russia

    International Nuclear Information System (INIS)

    Vishnevsky, Y.G.; Gutsalov, A.T.; Bukrinsky, A.M.; Gordon, B.G.

    1999-01-01

    The presentation describes the organisation scheme of Russian safety regulatory bodies, their tasks and responsibilities. Legislative and regulatory basis of NPP safety regulations rely on the federal laws: Law on the Use of Nuclear Energy and Law on Radiation Safety of the Population. Role of international cooperation and Improvement of regulatory activities in Russia are emphasised

  4. Safety Analysis Report for Ignalina NPP

    International Nuclear Information System (INIS)

    Negrivoda, G.

    1997-01-01

    In December 1994 an agreement was signed between the European Bank for Reconstruction and Development and the Republic of Lithuania for the grant of 32.86 MECU for the safety Improvement at Ignalina NPP. One of the conditions for the provision of the grant, was a requirement for an in-depth analysis of the safety level at Ignalina NPP in the scope and according to the standards acceptable for a western nuclear power plant, and to publish a Safety Analysis Report (SAR). The report should investigate and analyze any factor that could limit a safe operation of the plant, and provide recommendations for actual safety improvements. According to the agreement, Lithuania had to finalize the SAR until 31 December, 1995. The bank has also organized and financed investigation of safety at Ignalina NPP and preparation of the SAR. EBRD made an agreement with Sweden's Vattenfall, which subcontracted well-known companies from Canada, USA, Germany, etc., and also the Russian Research and Development Institute of Power Engineering (NIKIET), reactor designer of Ignalina NPP. The SAR is a very comprehensive document and contains about 8000 pages of text, diagrams and tables. The main findings of the SAR are provided in the article. A large number of discrepancies with modern rules and western practices was detected, but they were not proved to be serious enough to require reactors shutdown. Based on the recommendations of the SAR Ignalina NPP has worked out Safety Improvement Program No. 2 (SIP-2), which is planned for three years and will cost 486 MLT. (author)

  5. Mochovce site

    International Nuclear Information System (INIS)

    1997-01-01

    In Mochovce site the construction of four units of WWER 440 NPP with V-213 type of reactor is being carried out. The financing of Mochovce units completion was resolved in April 1996. The completion work commenced at the construction site under leadership of SKODA Prague, the general supplier. The completion work on building part and tests of constructional electric distributions and lightning constructors started. The revisions in technological part were finished, and final protocols from revisions are the basis for starting of completion work. The assembly of transport container anchorage,ventilation system in hermetic areas and hermetic coverage of pools for stored spent nuclear fuel is being carried out. The pre-completion tests of instrumentation and control of ventilation systems, individual dosimetric control in medical station, and tests of nuclear programme according to commissioning and assembling work schedule at the equipment for physical protection of the NPP area started. Inspection activities at Mochovce were performed in accordance with inspection plan for 1996. Evaluation of routine inspections was performed by means of quarterly protocols. Main findings from the inspections performed in Mochovce were in the following areas: (a) deficiencies in the knowledge of the respective regulation and conditions from the Resolution of the state regulatory body, concerning selected employees; (b) training of the selected employees; (c) aim of the measures imposes by inspectors is to eliminate deficiencies in preparation of programmes for pre-completion and completion testing. NRA SR assessment activities at Mochovce NPP were focused mainly on approving and inspecting of design modification to approving programmes for pre-completion and completion testing of system s and equipment and on approving quality assurance programmes. The suggestions of international missions, which reviewed Mochovce safety in the years, were taken into consideration in the programme

  6. Evaluating external costs of human health and environmental impacts using IAEA model SIMPACTS

    International Nuclear Information System (INIS)

    Bobric, Elena; Jelev, Adrian

    2005-01-01

    SIMPACTS (Simplified Approach for Estimating Impacts and External Costs of Electricity Generation) model developed at the International Atomic Energy Agency is a powerful and convenient tool for evaluating external costs induced by different energy sources. The model was developed for industrial countries and for developing countries as well where studies of alternatives of sustainable energy policies are conducted. The SIMPACTS allow the decision making factors involved in energy policy to have reasonable estimates of environment impacts and relating costs appealing to a rather low number of input parameters. The paper aims at analyzing by means of SIMPACTS the environmental impact produced by Cernavoda NPP operation in two cases: a) the impact of the Cernavoda NPP itself; b) the impact of an hypothetical coal based power plant of the same power level and located on the Cernavoda NPP site. The SIMPACTS modules AIRPACTS and NUCPACTS were applied to assess the impacts on human health, agricultural crops and building materials from exposure to routine atmospheric emissions and as well to quantify and value the adverse effects on human health due to routine atmospheric release of radionuclides from the NPP, via radioactive waste ground disposal or resulting from accidents in nuclear facility, respectively. The conclusion of this study based on SIMPACTS model application to assess the health effects and damage cost per year is that the Cernavoda NPP presents the lower health effects and damage cost comparing with power plants of other types

  7. Seismic re-evaluation of Kozloduy NPP criteria, methodology, implementation

    International Nuclear Information System (INIS)

    Kostov, M.

    2003-01-01

    The paper describes some features of the methodology applied for seismic upgrading of civil structures at the site of the Kozloduy NPP. The essence of the methodology is the use of as-build data, realistic damping and inelastic reduction factors. As an example of seismic upgrading the analyses of units 3 and 4 are presented. The analyses are showing that for effective seismic upgrading detailed investigations are needed in order to understand the significant response modes of the structures. In the presented case this is the rotation of the attached flexible structures to the stiff reactor building. Based on this an upgrading approach is applied to increase the seismic resistance for the predominant motion. The second significant approach applied is the strengthening of the prefabricated element joints. Although it is very simple it allows use of the available element capacity. (author)

  8. The Effect of NPP's Stack Height to Radiation Dose

    International Nuclear Information System (INIS)

    Pandi, Liliana Yetta; Rohman, Budi

    2003-01-01

    The purpose of dose calculation for accidents is to analyze the capability of NPP to maintain the safety of public and workers in case an accident occurs on the Plant in a site. This paper calculates the Loss of Coolant Accident in PWR plant. The calculation results shows that no risks of serious radiation exposure are given to the neighboring public even if such a large accident occurred, and the effect of stack height can be predicted by analysis of the calculation results. The whole dose is calculated for some location (100 m, 300 m, 500 m, 700 m, 900 m, 1500 m, and 2000 m) with three difference stack height i.e. 0 m, 40 m and 100 m. The result of the whole dose calculation is under permitted criteria for whole dose : 0.25 Sv and thyroid dose : 3.0 Sv. The calculation of radiation dose in this paper use EEDCDQ code

  9. Determination of source term for Krsko NPP extended fuel cycle

    International Nuclear Information System (INIS)

    Nemec, T.; Persic, A.; Zagar, T.; Zefran, B.

    2004-01-01

    The activity and composition of the potential radioactive releases (source term) is important in the decision making about off-site emergency measures in case of a release into environment. Power uprate of Krsko NPP during modernization in 2000 as well as changing of the fuel type and the core design have influenced the source term value. In 2003 a project of 'Jozef Stefan' Institute and Slovenian nuclear safety administration determined a plantspecific source term for new conditions of fuel type and burnup for extended fuel cycle. Calculations of activity and isotopic composition of the core have been performed with ORIGEN-ARP program. Results showed that the core activity for extended 15 months fuel cycle is slightly lower than for the 12 months cycles, mainly due to larger share of fresh fuel. (author)

  10. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  11. Two important safety-related verification tests in the design of Qinshan NPP 600 MWe reactor

    International Nuclear Information System (INIS)

    Li Pengzhou; Li Tianyong; Yu Danping; Sun Lei

    2005-01-01

    This paper summarizes two most important verification tests performed in the design of reactor of Qinshan NPP Phase II: seismic qualification test of control rod drive line (CRDL), flow-induced vibration test of reactor internals both in 1:5 scaled model and on-site measurement during heat function testing (HFT). Both qualification tests proved that the structural design of the reactor has large safety margin. (authors)

  12. Modernization of the oldest Swedish NPP

    International Nuclear Information System (INIS)

    Hagberth, Ronald

    1998-01-01

    OKG operates three BWR units of ABB design: Oskarshamn 1 with a net capacity of 440' MW, Oskarshamn 2 of 600 MW and Oskarshamn 3 of 1160 MW. Oskarshamn 1 NPP was commissioned in 1972 as the first commercial nuclear unit in Sweden. After more than twenty years of successful operation, the unit is now also the first reactor in Sweden to undergo a large safety modernization program. In the year 2000 the Oskarshamn 1 NPP will be modernized to a high level of safety standard and ready for operation for another period of at least 20 years. Experience gained can be used when modernizing other NPPs. The investment program for life extension is reasonable and shows that NPPs can be operated with an expected life span of more than 40 years at an ever-increasing safety level and still be very competitive in a deregulated market. (author)

  13. Intelligent system for accident identification in NPP

    International Nuclear Information System (INIS)

    Hernandez, J.L.

    1998-01-01

    Accidental situations in NPP are great concern for operators, the facility, regulatory bodies and the environmental. This work proposes a design of intelligent system aimed to assist the operator in the process of decision making initiator events with higher relative contribution to the reactor core damage occur. The intelligent System uses the results of the pre-operational Probabilistic safety Assessment and the Thermal hydraulic Safety Analysis of the NPP Juragua as source for building its knowledge base. The nucleus of the system is presented as a design of an intelligent hybrid from the combination of the artificial intelligence techniques fuzzy logic and artificial neural networks. The system works with variables from the process of the first circuit, second circuit and the containment and it is presented as a model for the integration of safety analyses in the process of decision making by the operator when tackling with accidental situations

  14. Quality of Industry Support to NPP Krsko

    International Nuclear Information System (INIS)

    Nemcic, K.

    2008-01-01

    NPP Krsko developed program for Supplier evaluation and performance. During the regular control of suppliers and evaluation of industry support to NPP Krsko quality problems were reported. Different quality systems were evaluated and different suppliers as: design organizations, equipment manufacturers, material vendors were audited or surveillance was performed. This paper discuss and report various cases where quality issues were problems based on audit results and present actions and efforts undertaken by the NE Krsko Quality Assurance Department to improve performance of the contractors, vendors, suppliers. New and different quality standards as approach in numerous articles are described as improvement or quality changes but also 'different opinion exist'. This paper also presents the author view and approach how to solve the possible future problems with different quality systems and organisations used by industry who support daily operation of NE Krsko and give recommendations for future nuclear projects.(author)

  15. SAT for NPP personnel training in USA

    International Nuclear Information System (INIS)

    Spinney, R.

    1995-01-01

    This discussion addressed the experience with the application of SAT at USA NPPs. In particular, the transition of NPP training processes, staff composition, and reporting structure from the TMI accident to present. As well, oversight and guidance activities of the INPO and more intensive inspection by the NRC began during this period. The average NPP training staff grew to 30-40 per unit, along with a change in reporting line from plant to corporate management. With the reduction of resources occurring in the late 1980s, overall training staff size decreased, the composition changed, and reporting line reverted to plant management. The overall lessons-learned for application of the SAT consisted of the need for simplification, management involvement, and exploitation of the technology

  16. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  17. NPP Temelin. Status of safety improvements

    International Nuclear Information System (INIS)

    1999-01-01

    The WWER-1000 Temelin NPP under construction has been subjected as other NPPs of the same type to numerous project reviews resulting in quite a number of recommendations for design changes. Results of the IAEA mission to review the resolution of WWER-1000 safety issues at Temelin NPP are cited in this paper. The main conclusions emphasize that a combination of eastern and western technology and practices led to safety improvements in comparison with the international practices. Plant managers are clearly committed to implementation of operational programs which are consistent with effective western operational safety practices. Considerable effort remains to bring planned programs to successful implementation, in particular in meeting the need to foster strong safety culture among all personnel

  18. External hazards at Kozloduy and Belene NPP sites

    International Nuclear Information System (INIS)

    Kostov, Marin; Varbanov, Georgy; Andonov, Anton

    2011-01-01

    Conclusions 1. KNPP and BNPP have adequate seismic design base that corresponds to the current standards 2. There is available seismic margin and cliff-edge effects are not probable 3. The external flooding hazard is properly assessed and there is available design margin 4. Anthropogenic hazards are properly assessed and there is available margin. The BNPP is designed also for the largest available aircraft impact (malevolent) 5. The tornado hazard in Bulgaria is negligible. The extreme combination of EQ, flooding, extreme wind, extreme cold and hot weather have to be studied 7. The risk of failure of all surrounding infrastructure due to earthquake, flooding or anthropogenic actions have to be studied 8. The preparedness for extreme hazards have to be improved and trained 9. The extreme hazard mitigation measures have to be constant and continuous effort

  19. Organizational aspects of NPP operator training

    International Nuclear Information System (INIS)

    Vel'chinskij, V.I.

    1992-01-01

    The main points of the document regulating the selection, prepation, permission for work and in-service control of NPP personnel developed on the basis of the IAEA requirements are considered. The specialists engaged for work are subjected to qualification, medical, professional, psychological and psychophysiological selections. The scheduled monthly instructive lessons are conducted during the work. The antiaccident and fire-fighting trainings are organized not rarely than twice in three months

  20. Current status of NPP generation IV

    International Nuclear Information System (INIS)

    Yohanes Dwi Anggoro; Dharu Dewi; Nurlaila; Arief Tris Yuliyanto

    2013-01-01

    Today development of nuclear technology has reached the stage of research and development of Generation IV nuclear power plants (advanced reactor systems) which is an innovative development from the previous generation of nuclear power plants. There are six types of power generation IV reactors, namely: Very High Temperature Reactor (VHTR), Sodium-cooled Fast Reactor (SFR), Gas-cooled Fast Reactor (GFR), Lead-cooled Fast Reactor (LFR), Molten Salt Reactor (MSR), and Super Critical Water-cooled Reactor (SCWR). The purpose of this study is to know the development of Generation IV nuclear power plants that have been done by the thirteen countries that are members of the Gen IV International Forum (GIF). The method used is review study and refers to various studies related to the current status of research and development of generation IV nuclear power. The result of this study showed that the systems and technology on Generation IV nuclear power plants offer significant advances in sustainability, safety and reliability, economics, and proliferation resistance and physical protection. In addition, based on the research and development experience is estimated that: SFR can be used optimally in 2015, VHTR in 2020, while NPP types GFR, LFR, MSR, and SCWR in 2025. Utilization of NPP generation IV said to be optimal if fulfill the goal of NPP generation IV, such as: capable to generate energy sustainability and promote long-term availability of nuclear fuel, minimize nuclear waste and reduce the long term stewardship burden, has an advantage in the field of safety and reliability compared to the previous generation of NPP and VHTR technology have a good prospects in Indonesia. (author)

  1. AGNES - safety reassessment of Paks NPP

    International Nuclear Information System (INIS)

    Gado, J.

    1995-01-01

    The main goal of the AGNES (Advanced General and New Evaluation of Safety) project for the reassessment of the safety of Paks Nuclear Power Plant, Hungary, was to improve the safety culture of the technology at Paks. A report was prepared on the reassessment of the Paks NPP safety. The analysis was divided into four groups: systems analysis, analysis of design basis accidents, severe accident analysis, and level 1 probabilistic safety analysis. Proposed safety enhancement measures are discussed. (N.T.)

  2. Design safety improvements of Kozloduy NPP

    International Nuclear Information System (INIS)

    Hinovski, I.

    1999-01-01

    Design safety improvements of Kozloduy NPP, discussed in detail, are concerned with: primary circuit integrity; reactor pressure vessel integrity; primary coolant piping integrity; primary coolant overpressure protection; leak before break status; design basis accidents and transients; severe accident analysis; improvements of safety and support systems; containment/confinement leak tightness and strength; seismic safety improvements; WWER-1000 control rod insertion; upgrading and modernization of Units 5 and 6; Year 2000 problem

  3. On some methods of NPP functional diagnostics

    International Nuclear Information System (INIS)

    Babkin, N.A.

    1988-01-01

    Methods for NPP functional diagnosis, in which space and time dependences for controlled variable anomalous deviations change are used as characteristic features, are suggested. The methods are oriented for operative recognition of suddenly appearing defects and envelop quite a wide range of possible anomalous effects in an onject under diagnostics. Analysis of transients dynamic properties caused by a failure is realized according to the rules, which do not depend on the character of anomalous situation development

  4. Using bentonite for NPP liquid waste treatment

    International Nuclear Information System (INIS)

    Bui Dang Hanh

    2015-01-01

    During operation, nuclear power plants (NPPs) release a large quantity of water waste containing radionuclides required treatment for protection of the radiation workers and the environment. This paper introduces processes used to treat water waste from Paks NPP in Hungary and it also presents the results of a study on the use of Vietnamese bentonite to remove radioactive Caesium from a simulated water waste containing Cs. (author)

  5. Perspectives of Living PSA in NPP Krsko

    International Nuclear Information System (INIS)

    Vrbanic, I.; Kastelan, M.

    1996-01-01

    Nuclear power plant Krsko has completed the Level 1/Level 2 Probabilistic Safety Analysis (PSA) for internal initiating events and is in the process of completing the same for the external initiators. The analysis completed up to now has provided a valuable insight into a plant risk profile. In NPP Krsko there is a plan to use the PSA model as a permanent tool for the risk based applications and incorporate it into a decision making process. In order to achieve this there is a need to permanently maintain the PSA model in a manner that it reflects both the plan configuration/design at a time point and the operational experience up to the time point. All the activities aimed toward keeping the PSA model up-to-dated in this sense are usually referred to as a Living PSA (LPSA) program. NPP Krsko is in the process of defining and proceduralizing a LPSA program that would be plant specific and based on known world practices. Further, in order to be suitable for risk based applications the PSA model must be flexible in a sense that modifications to the base case model may be done easily and requantifications performed quickly as to evaluate various conditions imposed by real or hypothetical situations. NPP Krsko PSA model has been based on licensing type software. The requirements specified above dictate the transfer of the overall model to an application oriented software of newer generation with larger capabilities. The transfer becomes a part of a mentioned ongoing effort aimed at establishing LPSA model and concept. The paper present this effort and the perspectives of LPSA concept and risk based applications in NPP Krsko. (author)

  6. Simulation of reinforced concrete NPP structures

    International Nuclear Information System (INIS)

    Zverev, A.B.; Yaskevich, E.E.; Tarannikov, V.N.; Loginov, A.Ya.; Lagutov, V.I.

    1989-01-01

    Analysis of stress-strained state of NPP frame structures at different stages of their operation using the method of physical simulation, is conducted. Comparison of model investigations to the data of full-scale deformation measurement allows one to define the strength resource of the structures under operation. Bench test layout and results of investigations into strength, deformation, thermal-physical and acoustic emission parameters of the investigated processes during model loading, are presented

  7. Conference: Nuclear Safety at the Ignalina NPP - Achievements and Challenges

    International Nuclear Information System (INIS)

    1999-01-01

    Brief description of conference which took place in Vilnius on 8-9 April 1999 is presented. The aim of the international conference is to review the work carried out, to evaluate its influence on the nuclear safety, to get acquainted with the safety system of the Ignalina NPP. On December 31, the Ignalina NPP celebrated its 15 year anniversary. During that period the Ignalina NPP has produced more than 182 billion kWh of electricity. Nuclear power is not only immense economic benefit but also a syndrome of fear of an atomic bomb and the Chernobyl accident that has formed over the years. Numerous comprehensive international studies have been performed at the Ignalina NPP. After the Chernobyl accident many steps have been taken to improve the safety of the Ignalina NPP. The introduced changes guaranteed that the void coefficient remained negative in all possible circumstances. The Ignalina NPP is intensively preparing for licensing of unit 1

  8. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  9. Ageing management database development for PWR NPP steam generator

    International Nuclear Information System (INIS)

    Liu Hongyun; Xu Liangjun; Xiong Changhuai; Wang Xianyuan

    2005-01-01

    Steam generator (SG) is one of the key safe important equipment of NPP, which is covered by NPP aging management program. Steam Generator Aging Management Dabatase (SGAMDB) is developed to provide necessary information for SG aging management. RINPO is developing SGAMDB for domestic NPP. This system contains information and data about SG design, manufacture, operation and maintenance. The information include NPP fundamental data, SG design data, SG aging mechanism, SG operation data, SG ISI data, SG maintenance data and SG evaluation interface. The system runs at the intranet of Qinshan-1 NPP with B/S mode. It can provide information inquire and fundamental analysis for NPP SG aging team and SG aging researcher's. In addition, it provides necessary information and data for SG aging analysis and evaluation, such as all pressure test process and flaws of tubes, and collects the analysis results. (authors)

  10. Fuel leak testing performance at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Slugen, V.; Krnac, S.; Smiesko, I.

    1995-01-01

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR's. 1 tab., 2 figs., 3 refs

  11. Fuel leak testing performance at NPP Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Slugen, V; Krnac, S [Slovak Technical Univ., Bratislava (Slovakia); Smiesko, I [Nuclear Powr Plant EBO, Jaslovske Bohuce (Slovakia)

    1996-12-31

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR`s. 1 tab., 2 figs., 3 refs.

  12. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  13. About choosing the power unit of NPP

    International Nuclear Information System (INIS)

    Alekseev, P.N.; Mordashev, V.M.; Proshkin, A.A.; Stukalov, V.A.; Subbotin, S.A.; Tsibul'skij, V.F.; Chernilin, Yu.F.

    2008-01-01

    The present-day domestic nuclear power industry faces the necessity to make both process and economy related decisions. The mentioned decisions should cover all the aspects of the nuclear power complex. In particular, as of now, no substantiation of the present-day and the future requirements for the power unit of the WWER and fast reactor NPPs is available. The choice of the unit power of an NPP should involve consideration of all factors and should not be boiled down to the efforts to ensure the minimization of the investment and the operation constituents of the electric power generation costs. The aim of the present paper was to ensure elaboration of the recommendations to substantiate the optimal unit power of NPP power units based on the analysis of various factors to design, to construct and to operate an NPP (investment, time of construction, the unscheduled shutdown losses, the unification, the fabrication quality, the accident damage, etc.), and the electrical network potentialities and the regional electric power demands [ru

  14. Safety parameter display system for Kalinin NPP

    International Nuclear Information System (INIS)

    Andreev, V.I.; Videneev, E.N.; Tissot, J.C.; Joonekindt, D.; Davidenko, N.N.; Shaftan, G.I.; Dounaev, V.G.; Neboyan, V.T.

    1995-01-01

    The paper discusses the safety parameter display system (SPDS), which is being designed for Kalinin NPP. The assessment of the safety status of the plant is done by the continuous monitoring of six critical safety functions and the corresponding status trees. Besides, a number of additional functions are realized within the scope of KlnNPP, aimed at providing the operator and the safety engineer in the main control room with more detailed information in accidental situation as well as during the normal operation. In particular, these functions are: archiving, data logs and alarm handling, safety actions monitoring, mnemonic diagrams indicating the state of main technological equipment and basic plant parameters, reference data, etc. As compared with the traditional scope of functions of this kind of systems, the functionality of KlnNPP SPDS is significantly expanded due to the inclusion in it the operator support function ''computerized procedures''. The basic SPDS implementation platform is ADACS of SEMA GROUP design. The system architecture includes two workstations in the main control room: one is for reactor operator and the other one for safety engineer. Every station has two CRT screens which ensures computerized procedures implementation and provides for extra services for the operator. Also, the information from the SPDS is transmitted to the local crisis center and to the crisis center of the State utility organization concern ''Rosenergoatom''. (author). 3 refs, 6 figs, 1 tab

  15. The NPP Isar comprehensive Aging Management Program

    International Nuclear Information System (INIS)

    Zander, Andre; Ertl, Stefan

    2012-01-01

    The majority of System, Structure and Components (SSC) in a nuclear power plants are designed to experience a service life, which is far above the intended design life. In most cases, only a small percentage of SSCs are subject to significant aging effects, which may affect the integrity or the function of the component. The process of aging management (AM) has the objective to monitor and control degradation effects which may compromise safety functions of the plant. And furthermore, to ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects. Safety-related aspects and the targeted high availability of the power plant as well as the requirements stipulated by German regulatory authorities prompted the operator of NPP ISAR to introduce an aging surveillance program. The NPP Isar as well as the German NPPs has to be following in the scope of aging management the KTA 1403 guideline. The NPP Isar surveillance program based on the KTA 1403 guideline covers the following aspects: - Scoping and screening of safety relevant Systems, Structures and Components (SSC); - Identification of possible degradation mechanisms for safety relevant SSC; - Ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects; - Transferability check of industry experience (internal and external events); - Annual preparation of an AM status report. (author)

  16. Tritium liquid effluents from the Krsko NPP

    International Nuclear Information System (INIS)

    Savli, S.; Krizman, M.; Nemec, T.; Cindro, M.; Stritar, A.; Vokal Nemec, B.; Janzekovic, H.

    2007-01-01

    In the past, 12-months' fuel cycles in the Krsko NPP had not caused any problems regarding compliance with its Technical Specifications and license limits on liquid tritium releases (20 TBq/year, 8 TBq/three months). The first 18-months' fuel cycle, which was introduced in 2004, required fuel with higher enrichment, higher boron concentration in the primary coolant and more fuel rods with burnable poisons. In 2005, the NPP operated without refueling outage for the whole year and produced the highest amount of energy so far. Due to these facts and a few unplanned shutdowns and power reductions, production of tritium and releases increased strongly in 2005. As a result, the Krsko NPP hardly succeeded to stay within regulatory limits on tritium releases. However, the three-months' limit was exceeded in the first quarter of 2006. On the basis of conclusions acquired from the SNSA's study and practice of other European countries the SNSA considerably increased the annual limit of permitted liquid tritium releases (from 20 TBq to 45 TBq) and abolished the three-months' limit. At the same time, the SNSA reduced the limit of fission and activation products by halves. (author)

  17. Optimization of radiation protection at Bohunice NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Svitek, J.

    2003-01-01

    Bohunice Nuclear Power Plant is situated in south - western part of Slovakia about 50 km away from Bratislava. There are four PWR reactors 440 MW e each - two units with reactors WWER - 230 (V1 NPP) and two units with WWER - 213 (V2 NPP). requirements for the optimization process are given in the mentioned Code No.12 of Ministry of Health. Code 12 stipulates the technical and organizational requirements for proving the Rational Achievable Level (RAL) of radiation protection. This level can be proved by means of the comparison of the dose distribution to the costs of protection. An example of two figures of dose constraints is: collective dose 20 man mSv for the specific task; individual exposure 1 mSv per day. The values of the financial equivalents of personal exposure - so called the alpha coefficients - are used for the calculation of the benefit of proposed measures. Impact of legislative changes into Bohunice NPP and optimization process are presented. Apparently the new law and the associate code created a base of transparent and understandable policy of radiation protection and optimization in Slovak Republic. The radiation protection legislative was implemented into the praxis and persons became familiar with it. Defining clear and unambiguous terms facilitated the communication between users and the regulatory body - State Health Institute. Optimization was generally accepted by the workers and managers and began to be a part of safety culture of operation at nuclear power plants. (authors)

  18. Knowledge management in the NPP domain

    International Nuclear Information System (INIS)

    Nilsen, Svein; Bisio, Rossella; Ludvigsen, Jan Tore

    2004-03-01

    This report gives an outlook on Knowledge Management (KM) activities within NPP related establishments as of today. There may be less activity in the NPP world as compared to many other industrial sectors. Still there is an awakening within the NPP industry demanding that KM should be attended to at a larger scale. The most notable reason for this is maybe an imminent increase in the number of people going into retirement. The types of establishments involved cover the major kinds such as utilities, research institutes and worldwide nuclear organizations. The report sums up a few of those efforts that are presently being implemented. Moreover the report looks at general advancements within the field of knowledge management. Simply stated the endeavours belong to either one of two classes. The first class emphasize the use of technology to solve knowledge management problems. The second class regard knowledge management as a problem pertaining to human factors and organizational issues. This report maintain that knowledge management initiatives should make due considerations to both perspectives. This report also sums up the Halden Reactor Project short term KM initiative. (Author)

  19. Application of the SASSI soil structure interaction method to CANDU 6 NPP seismic analysis

    International Nuclear Information System (INIS)

    Ricciuti, R.A.; Elgohary, M.; Usmani, S.A.

    1996-01-01

    The standard CANDU 6 NPP has been conservatively qualified for a Design Basis Earthquake (DBE) peak horizontal ground acceleration of 0.2 g. Currently there are potential opportunities for siting the CANDU 6 at higher seismicity sites. In order to be able to extend the use of a standardized design for sites with higher seismicity than the standard plant, various design options, including the use of the SASSI Soil Structure Interaction (SSI) analysis method, are being evaluated. This paper presents the results of a study to assess the potential benefits from utilization of the SASSI computer program and the use of more realistic damping ratios for the structures

  20. Document status for 1 and 2 Kozloduy NPP decommissioning activities -Phase 'Final Shutdown'

    International Nuclear Information System (INIS)

    Vangev, A.; Boyadjiev, Z.

    1997-01-01

    Decommissioning process (D and D) is the final phase of each nuclear reactor life cycle. The first nuclear reactor generation has reached his expiration life date. Decommissioning working documentation had not been taken into account at the project and construction stage. The decommissioning activities, planning and legislation has to develop along their operation. Most of developed nuclear energetic countries have gathered good experience and have create their own decommissioning strategy. This report represents in brief an overview of different country's approaches and the Kozloduy NPP decommissioning activity intention in near future and reviews the D and D working document status for 1 and 2 Kozloduy NPP Units decommissioning. Kozloduy NPP D and D task to the moment is to plan the first stage of the decommissioning process - 'The Final Shutdown' and to prepare the working documents for the phase execution. The Final Shutdown of Kozloduy NPP - 1 is the termination of operation of the Units 1 and 2 and the electricity production cessation after their useful life exhaust. In accordance with the legal legislation in Bulgaria only the normal planned termination of operation on units 1 and 2 should be prescribed. The project results concern the initial condition of the equipment and systems, their preparation and sequence for defueling, decontamination and dismantling. A plan for activities' organization for D and D and Complex Characterization of the Site under consideration will contain the following documents: 1. Time-schedule for the sequence of activities during the stages of the Final Shutdown and Safe Enclosure preparation. Technical project for organization of work related to Final Shutdown; 2. Complex Characterization Programme for a condition investigation of the Units 1 and 2 equipment and systems. 3. Technical project for design modifications and dismantling of equipment and systems which violate the radiation and nuclear safety during the Final Shutdown

  1. Application of ARCON96 in NPP control room habitability assessment and its comparison with composite wake model

    International Nuclear Information System (INIS)

    Fang Sheng; Li Hong; Fang Dong

    2012-01-01

    ARCON96 is the current NRC-recommended atmospheric dispersion model that may be used to estimate atmospheric relative concentration in assessing the habitability of a NPP control room during design basis radiological events. Based on meteorological data from a NPP site in China, the atmospheric relative concentration was calculated and analyzed using ARCON96, and then compared with calculations by the composite wake model. Results demonstrated that ARCON96 is feasible for atmospheric relative concentration estimation and its estimate is more conservative than the composite wake model. (authors)

  2. Some features of South-Ukrainian NPP information centre's interaction with mass media in post Chernobyl period

    International Nuclear Information System (INIS)

    Kiyashko, S.; Kurilchik, N.

    1995-01-01

    Using the above methods of interaction with the off-site media helped the South Ukraine NPP information centre achieve meaningful results in restoring the image of nuclear power ad making it more trustworthy. This is supported by a review of media Publications since 1989. Quantitative and qualitative modifications of the information flow to the media have yielded substantial changes of the structure of news releases about the South Ukraine NPP and nuclear power. Background information has increased from 1. 5 to 50 percent. Negative information is no longer dominating, and the Chernobyl topic is counterbalanced with diverse NucNet materials about nuclear from throughout the world. (author)

  3. Seismic safety programme at NPP Paks. Propositions for coordinated international activity in seismic safety of the WWER-440 V-213

    International Nuclear Information System (INIS)

    Katona, T.

    1995-01-01

    This paper presents the Paks NPP seismic safety program, highlighting the specifics of the WWER-440/213 type in operation, and the results of work obtained so far. It covers the following scope: establishment of the seismic safety program (original seismic design, current requirements, principles and structure of the seismic safety program); implementation of the seismic safety program (assessing the seismic hazard of the site, development of the new concept of seismic safety for the NPP, assessing the seismic resistance of the building and the technology); realization of the seismic safety of higher level (technical solutions, drawings, realization); ideas and propositions for coordinated international activity

  4. On psichological problem of NPP operation and control

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1994-01-01

    The role of psichological factor as a reserve for increasing NPP safety connected with human factor is discussed. It is emphasized that the process of NPP personnel professional training should not be restricted by formation of a certain set of knowledge, skills and experience. It is necessary to initiate ability for constant self-developing. Control for assurance of effective interaction of the whole NPP personnel is an important problem

  5. Safety Culture Survey in Krsko NPP

    International Nuclear Information System (INIS)

    Strucic, M.; Bilic Zadric, T.

    2008-01-01

    The high level of nuclear safety, stability and competitiveness of electricity production, and public acceptability are the main objectives of Krsko Nuclear Power Plant. This is achievable only in environment where strong Safety Culture is taking dominant place in the way how employees communicate, perform tasks, share their ideas and attitudes, and demonstrate their concern in all aspects of work and coexistence. To achieve these objectives, behaviour of all employees as well as specific ethical values must become more transparent and that must arise from the heart of organization. Continuous ongoing and periodic self assessments of Safety Culture in Krsko NPP present major tools in implementation process of this approach. Benefits from Periodic interdisciplinary focused self assessment approach, which main intention is finding the strengths and potential areas for improvements, was used second time to assess the area of Safety Culture in Krsko NPP. Main objectives of self assessment, performed in 2006, were to increase the awareness of the present culture, to serve as a basis for improvement and to keep track of the effects of change or improvement over a longer period of time. For the purpose of effective self assessment, extensive questionnaire was used to obtain information that is representative for whole organization. Wide range of questions was chosen to cover five major characteristics of safety culture: Accountability for safety is clear, Safety is integrated into all activities, Safety culture is learning-driven, Leadership for safety is clear and Safety is a clearly recognized value. 484 Krsko NPP employees and 96 contractors were participated in survey. 70-question survey provided information that was quantified and results compared between groups. Anonymity of participant, as well as their willingness to contribute in this assessment implicates the high level of their openness in answering the questions. High number of participant made analysis of

  6. Dissemination of Knowledge about NPP Instrumentation and Control Systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.

    2016-01-01

    Full text: Instrumentation and control (I&C) systems are the most variable part in the nuclear power plants (NPP) comparatively with any other NPP systems. This statement is connected with the wide use of computers, rapid changes in information technologies, with the appearance of new computer complex electronic components, e.g., field programmable gate arrays (FPGA) and with appropriate point of their insertion into NPP I&C life cycle. The changes in NPP I&C systems require the dissemination of the knowledge about these systems. Lessons after Fukushima accident increase necessity of these actions. The elaboration and following dissemination of this knowledge took place in different directions: • Writing and issue of three new books about NPP I&C systems for specialists and for students which were issued in Ukrainian and USA public houses (the last book was issued in 2014); • Organization of five international scientific technical conferences, devoted to NPP I&C safety problems; • Elaboration of national (Ukrainian) standards and regulations pertaining to safety important NPP I&C systems (the last standard was issued in 2015) and participation in elaboration of international standards; • Lecturing for university students, NPP specialists and I&C designers. These actions in all directions are added to IAEA activity in the area NPP I&C systems (e.g., IAEA NP-T-3.12 “Core Knowledge on I&C systems in NPP”). (author

  7. Leningrad NPP and energetics of north-western Russia

    International Nuclear Information System (INIS)

    Belov, I.

    2000-01-01

    Problems of Leningrad NPP operating units modernization, their design service life finishing by year of 2010, are discussed. To assure safe operation of unit 1 investments in the amount of 30 mln. dol are necessary. Estimations suggest economic efficiency of the measures, permitting saving of 300 mln. dol worth of gas. Unfortunately, without a rise in tariff for electric power produced by NPP it seems impossible. It is recommended that substantiated tariffs are set for electric power produced by NPP starting from January, 2000. The measure is indispensable for raising investment funds intended for operating NPP modernization [ru

  8. Probabilistic assessment of NPP safety under aircraft impact

    International Nuclear Information System (INIS)

    Birbraer, A.N.; Roleder, A.J.; Arhipov, S.B.

    1999-01-01

    Methodology of probabilistic assessment of NPP safety under aircraft impact is described below. The assessment is made taking into account not only the fact of aircraft fall onto the NPP building, but another casual parameters too, namely an aircraft class, velocity and mass, as well as point and angle of its impact with the building structure. This analysis can permit to justify the decrease of the required structure strength and dynamic loads on the NPP equipment. It can also be especially useful when assessing the safety of existing NPP. (author)

  9. Predisposal of Radioactive Waste from NPP 1000 MWe

    International Nuclear Information System (INIS)

    Suryantoro

    2007-01-01

    Predisposal of radioactive waste from NPP 1000 MW which was planned to be operated in 2016 has been conducted. In this study NPP applying PWR type was assumed. This assessment comprises all aspects of radioactive waste coming from NPP. One through cycle was chosen consequently no reprocessing step will be conducted. The assessment shows that technologically all radioactive waste treatment process rising from NPP operation has similarities to the existing radioactive waste process conducted by RWI which has lower scale of waste amount. (author)

  10. From the chronicle of training of Dukovany NPP staff

    International Nuclear Information System (INIS)

    2005-01-01

    The long way the Dukovany NPP had to go before the plant staff was fully qualified and skilled is described. First the training concept was prepared, then the necessary training facilities were set up, lecturers and instructors were hired and trained, training programmes and training materials were developed, and ultimately the first training course was launched in 1979. A training NPP was constructed and a full-scope simulator of the Dukovany NPP was set up. The current status of organization of NPP staff training by the CEZ utility is highlighted. (author)

  11. Training center of Rovenskaya NPP. The experience of creation

    International Nuclear Information System (INIS)

    Fedorov, O.M.; Aristov, B.N.

    1991-01-01

    Experience in creation of a teaching-training centre at the Rovno NPP, which uses means available at unified NPPs, at most is discussed. The centre hardware complex functions include the event filing and providing for user-friendly interface with NPP technical personnel under training. The system of personnel training at the Rovno NPP teaching-training centre gives an opportunity to analyze accidents and emergency conditions more completely and carefully. The taching analysis of failures and accidents by a NPP operators using the complex of the teaching-training centre hardware sufficiently improves knowledge of particular accidents

  12. Safety enhancement in NPP Bohunice

    International Nuclear Information System (INIS)

    Lipar, M.; Mihalik, M.

    1997-01-01

    The upgrading and safety enhancement of both the Bohunice V-1 and V-2 reactors is described in detail. The total estimated cost of the gradual reconstruction of these two units during 1996 to 1999 is 180 mil. US dollars. For the 1995 to 1997 period, the actions common for both units include a quality assurance programme, a personnel training programme, installation of a multifunction simulator, implementation of symptom-oriented operation procedures, installation of diagnostic systems, of a site security system, and of a teledosimetric system. At present, the main maintenance tasks are: to carry out major repair of units, to remedy service interruptions, to enhance equipment service availability, to enhance the technical level of corrective actions at equipment. Investment into maintenance level upgrade has grown from 7.5 mil. Slovak crowns in 1994 to estimated 32 mil. in 2000. The partners of international cooperation are mentioned. (M.D.)

  13. Organizational development at Forsmark NPP

    International Nuclear Information System (INIS)

    Metzen, H.

    2001-01-01

    Forsmark is a three unit BWR site with a total capacity of 3200 MW. Units 1 and two are identical and went into commercial operation in 1980 and 1981. Unit 3 is of a later design with an output of 1200 MW and has been operating since 1985. The average availability for the site has been over 90% for the last 10 years, and the total busbar cost has been competitive. A consistent management strategy has been used to achieve the good results. Several organizational modifications have been made during the years to adapt the organization to changing internal and external conditions. An overall goal regarding staffing has been to keep the number of employees at the same level as in 1985 when Unit 3 went into commercial operation. During the time period from 1975, when the operational organization was formed, until today, the focus for the organization has changed several times. During the commissioning period the focus was on training and establishing routines and procedures. During the first years of operation development of maintenance programs and taking over activities from the supplier dominated. Next area in focus was increasing availability and making the outages more efficient. Several minor modifications to the plant were made to support maintenance activities. More focus on cost reduction and increasing the production through technical modifications were next. After 15 years of operation the need for replacement of components to ensure reliable operation was evident. A program for major modifications was developed, aiming at 40 years lifetime. Deregulation of the Nordic Electricity Market now calls for further reductions in production costs. (author)

  14. Construction work organization at the Paluel NPP (France)

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    Construction work organization at French Paluel NPP, comprising four 1300 MWe power units with PWR type reactors, has been described. Ground works have been performed by three excavating machines with dipper capacity 5.5, 7.6 and 8.3 m 3 , total productivity of them reaching 1200 m 3 /hr. To transport the ground 22 dump trucks with bulk body capacity 18 cm 3 , load-carrying capacity 35 t were used. Each dump truck was loaded in 49-90 s, daily average productivity reached 45000 m 3 , which permitted to fulfil the ground works in two years. To produce concrete mixture at the NPP construction site a concrete plant is built with the productivity 160 m 3 /hr with two computer-controlled concrete-mixing installations. Concrete-placing machines with a telescopic boom transported concrete mixture to 42 m at the boom inclination up to 30 deg. Them the mixture was transported by belt conveyers with the length of a separate link 30 m and it was supplied to rotating conveyer, permitting to place concrete in the radius of 12.5 m at the angle of approximately 24 deg. The rate of placement of concrete in cylindrical part of containment reached 10 m/month and was realized by two concrete-delnvery pipelines up to 118 m long. When erecting building constructions 14 tower cranes with load-carrying capacity of 3-15 t and one tower crane with load carrying capacity of 500 t were used

  15. Seismic response analysis of Wolsung NPP structure and equipment subjected to scenario earthquakes

    Energy Technology Data Exchange (ETDEWEB)

    Choi, In Kil; Ahn, Seong Moon; Choun, Young Sun; Seo, Jeong Moon

    2005-03-15

    The standard response spectrum proposed by US NRC has been used as a design earthquake for the design of Korean nuclear power plant structures. However, it does not reflect the characteristic of seismological and geological of Korea. In this study, the seismic response analysis of Wolsung NPP structure and equipment were performed. Three types of input motions, artificial time histories that envelop the US NRC Regulatory Guide 1.60 spectrum and the probability based scenario earthquake spectra developed for the Korean NPP site and a typical near-fault earthquake recorded at thirty sites, were used as input motions. The acceleration, displacement and shear force responses of Wolsung containment structure due to the design earthquake were larger than those due to the other input earthquakes. But, considering displacement response increases abruptly as Wolsung NPP structure does nonlinear behavior, the reassessment of the seismic safety margin based on the displacement is necessary if the structure does nonlinear behavior; although it has adequate the seismic safety margin within elastic limit. Among the main safety-related devices, electrical cabinet and pump showed the large responses on the scenario earthquake which has the high frequency characteristic. This has great effects of the seismic capacity of the main devices installed inside of the building. This means that the design earthquake is not so conservative for the safety of the safety related nuclear power plant equipments.

  16. Lessons learned from current Qinshan CANDU project and the impact on future NPP's

    International Nuclear Information System (INIS)

    Hedges, K. R.; Didsbury, R.; Yu, S. K. W.

    2000-01-01

    AECL has adopted an evolutionary approach to the development of the CANDU 6 and CANDU 9 Nuclear Power Plant (NPP) designs. Each new NPP project benefits from previous projects and contains an increasing number of fully proven enhancements. In accordance with this evolutionary design approach, AECL has built on the Wolsong and Qinshan successes and the solid performance of the reference CANDU stations to define, review and implement the enhancements for the CANDU 9 NPP. Some of these enhancements include fully integrated project information systems and databases, safety enhancements coming from PSA studies and licensing activities, distributed control systems for plant-wide control and an advanced control center which addresses human factors engineering concepts. Examples of the Qinshan CANDU project delivery enhancements are the utilization of electronic engineering tools for the complete plant, and the linking of these tools with the project material management system and document management systems. The project information is reviewed and approved at the engineering office in Canada and then transmitted to site electronically. Once the electronic data is at site the information packages are extracted as necessary to enable construction and facilitate contract needs with minimum effort. This paper will provide details of the CANDU Qinshan project experiences as well as describing some of the corresponding CANDU 9 enhancements. (author)

  17. Seismic response analysis of Wolsung NPP structure and equipment subjected to scenario earthquakes

    International Nuclear Information System (INIS)

    Choi, In Kil; Ahn, Seong Moon; Choun, Young Sun; Seo, Jeong Moon

    2005-03-01

    The standard response spectrum proposed by US NRC has been used as a design earthquake for the design of Korean nuclear power plant structures. However, it does not reflect the characteristic of seismological and geological of Korea. In this study, the seismic response analysis of Wolsung NPP structure and equipment were performed. Three types of input motions, artificial time histories that envelop the US NRC Regulatory Guide 1.60 spectrum and the probability based scenario earthquake spectra developed for the Korean NPP site and a typical near-fault earthquake recorded at thirty sites, were used as input motions. The acceleration, displacement and shear force responses of Wolsung containment structure due to the design earthquake were larger than those due to the other input earthquakes. But, considering displacement response increases abruptly as Wolsung NPP structure does nonlinear behavior, the reassessment of the seismic safety margin based on the displacement is necessary if the structure does nonlinear behavior; although it has adequate the seismic safety margin within elastic limit. Among the main safety-related devices, electrical cabinet and pump showed the large responses on the scenario earthquake which has the high frequency characteristic. This has great effects of the seismic capacity of the main devices installed inside of the building. This means that the design earthquake is not so conservative for the safety of the safety related nuclear power plant equipments

  18. Diversity of microflora at the fourth destroyed unit of the ChNPP

    International Nuclear Information System (INIS)

    Parenyuk, O.Yu.; Shavanova, K.Je.; Yilljenko, V.V.; Gudkov, Yi.M.; Nanba, K.; Takasi, T.; Syimutyin, Yi.O.; Samofalova, D.O.; Ribalka, V.B.

    2017-01-01

    DNA of the substrate, sampled from six points in the destroyed 4-th power unit of ChNPP, where the dose rate on the microorganisms ranges from 0.008 to 0.12 Gy/h, was analyzed by New Generation Sequencing technology. It was found that the most diverse and stable microbiome occurs in sample, located outside of the ''Ukryttya'' object on the industrial site (conditional control). There are no dominants in it, which means that it is the most balanced and approximate to the general state of the soil microbiome of ecosystems surrounding the ChNPP. As for the sample, taken from the spot, where the dose rate was the highest, total number of species represented appeared eight times smaller, but dominance index was the highest, which indicates the formation of distinct microbiome dominants.

  19. System, economy and ecology viewpoints of the Krsko NPP lifetime extension

    International Nuclear Information System (INIS)

    Novsak, M.; Spiler, J.; Zagar, T.; Pirs, B.; Bole, A.; Bregar, Z.; Cuhalev, I.; Derganc, B.; Ivanjko, S.; Matvoz, D.; Sustersic, A.; Valencic, L.; Zabric, I.; Zlatarev, G.; Babuder, M.

    2007-01-01

    Krsko NPP plant life extension was analysed and evaluated with respect to system, economy and ecology viewpoints. From the system perspective it was established that also in the extended lifetime the plant will remain in operation as a base load electricity supplier. The systematic review was performed to determine its overall competitiveness against advanced coal, gas and new nuclear units. The analysis considered also hydro and renewable sources. Analysis and evaluations resulted in the conclusion that the Krsko NPP lifetime extension is the most effective alternative for base load production due to small additional capital investments, low fuel costs, no new siting requirements, lowest climate and environmental impact, and reliable and safe operation. (author)

  20. AREVA NP products and services for NPP operation and maintenance improvement

    International Nuclear Information System (INIS)

    Dechelette, Anne; Rat, Guy Le

    2009-01-01

    AREVA supplies customized services throughout the reactor improvement process according to clients' requirements: safety, performance, availability, obsolescence, operating and maintenance conditions, environment and technical assistance. Form design studies to on site modification and implementation including requalification tests, AREVA, as OEM*, has various products and services in the field of Engineering and Upgrading to satisfy client demands. In keeping with Inpo's AP913 approach, AREVA is particularly skilled in this methodology to help utilities improve availability factor and maintenance programs. AREVA has customized its services to many utilities in cooperating with local partners, suppliers, and engineering service providers through partnerships, consortiums, joint ventures, etc. AREVA's knowledge of the fleet's operation and maintenance experience helps NPP clients to identify the most cost effective improvements and approaches. Different examples of modifications of modifications and improvements performed in France and abroad illustrate AREVA's involvement in the NPP continuous upgrade process

  1. Regulatory supervision of the radiation protection and release during the dismantling of the German NPP Wuergassen

    International Nuclear Information System (INIS)

    Boerchers, F.; Hillberg, M.

    2003-01-01

    The NPP Wuergassen (KWW) is a commercial, single unit boiling water reactor with a capacity of 670 MW el . It was commissioned by PreussenElektra and constructed by AEG/KWU between 1968 and 1971. This NPP was finally shut down in 1994. The decommissioning, started in April 1997, is still under progress. Up to now, approx. 9,500 Mg of various materials (e.g. metal scrap, cable, concrete) have been deconstructed and released from the site. In this paper we describe the contribution from the authority and the independent expert during the radiological characterisation, the dismantling work, and the material flow up to the release. Special focus will be on the necessary control steps and the documentation regarding the dismantling work and the procedure of release. There is always a close fit between the radiation protection and the release of material on the basis of the radiological characterisation. (authors)

  2. Jpss System Architecture Npp to the Future

    Science.gov (United States)

    Furgerson, J.; Trumbower, G.

    2012-12-01

    The National Oceanic and Atmospheric Administration (NOAA) is acquiring the next-generation weather and environmental satellite system, named the Joint Polar Satellite System (JPSS). The National Aeronautics and Space Administration (NASA) serves as the acquisition and development agent. JPSS replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA in the 1330 local time of ascending node (LTAN) orbit. The Suomi National Polar-orbiting Partnership (NPP) was launched into the 1330 LTAN orbit on October 28, 2011, and carries advanced sensors which will be featured on JPSS. It serves as a bridge mission and provides continuity for the NASA Earth Observation System and the POES. JPSS-1 is scheduled to launch in 2017. The Defense Meteorological Satellite Program (DMSP) managed by the DoD is operating in the 1730 LTAN orbit. The DoD is developing the Defense Weather Satellite Follow-on (WSF) system which will continue in the 1730 orbit. NASA is developing the Common Ground System (CGS) with the capability to process data from both the JPSS and WSF constellations. The CGS will be operated by NOAA. This poster will provide a top level status update of the program, as well as an overview of the JPSS system architecture. The space segment carries a suite of sensors that collect meteorological, oceanographic, and climatological observations of the earth and atmosphere. The system design allows centralized mission management and delivers high quality environmental products to military, civil and scientific users through a Command, Control, and Communication Segment (C3S). The data processing for NPP/JPSS is accomplished through an Interface Data Processing Segment (IDPS)/Field Terminal Segment (FTS) that processes NPP/JPSS satellite data to provide environmental data products to NOAA and DoD processing centers as well as remote terminal users.

  3. Corporate portal system at PAKS NPP, Hungary

    International Nuclear Information System (INIS)

    2009-01-01

    The new Corporate Portal System (CPS) of Paks NPP was launched in November 2006. The portal is based on one of the latest technologies, Plumtree Enterprise WEB 5.0. The main purpose of the installation of the new technology was to serve the working culture change, to give a platform to access all information and applications including the integrated process model used at the NPP. The new technology also supports those goals which were defined in the organization development programme: e.g. to improve internal communication with the establishment of communities of practice. Installation of the CPS has provided a powerful tool for knowledge management; it is possible to share and find all information through a controlled access in documents from various sources, to have links to people, portlets and different communities. Document management of the Paks NPP is supported by the integration of the Document 5 application, as the new Electronic Data Management System (EDMS) and the CPS. Depending on their access rights, all users of the CPS, through Microsoft Internet Explorer, can access technical, economic and human resources documents which are stored anywhere on the internal network (file servers, EDMS, old INRANET). The CPS is also accessible from the internet through a secure connection. The main concept is the integration of all applications to one platform and to help users to find all information they need. An access control list specifies which users and groups have access to an object (and what kind of access privileges they have such as read, select, edit, admin)

  4. Near Real Time Processing Chain for Suomi NPP Satellite Data

    Science.gov (United States)

    Monsorno, Roberto; Cuozzo, Giovanni; Costa, Armin; Mateescu, Gabriel; Ventura, Bartolomeo; Zebisch, Marc

    2014-05-01

    Since 2009, the EURAC satellite receiving station, located at Corno del Renon, in a free obstacle site at 2260 m a.s.l., has been acquiring data from Aqua and Terra NASA satellites equipped with Moderate Resolution Imaging Spectroradiometer (MODIS) sensors. The experience gained with this local ground segmenthas given the opportunity of adapting and modifying the processing chain for MODIS data to the Suomi NPP, the natural successor to Terra and Aqua satellites. The processing chain, initially implemented by mean of a proprietary system supplied by Seaspace and Advanced Computer System, was further developed by EURAC's Institute for Applied Remote Sensing engineers. Several algorithms have been developed using MODIS and Visible Infrared Imaging Radiometer Suite (VIIRS) data to produce Snow Cover, Particulate Matter estimation and Meteo maps. These products are implemented on a common processor structure based on the use of configuration files and a generic processor. Data and products have then automatically delivered to the customers such as the Autonomous Province of Bolzano-Civil Protection office. For the processing phase we defined two goals: i) the adaptation and implementation of the products already available for MODIS (and possibly new ones) to VIIRS, that is one of the sensors onboard Suomi NPP; ii) the use of an open source processing chain in order to process NPP data in Near Real Time, exploiting the knowledge we acquired on parallel computing. In order to achieve the second goal, the S-NPP data received and ingested are sent as input to RT-STPS (Real-time Software Telemetry Processing System) software developed by the NASA Direct Readout Laboratory 1 (DRL) that gives as output RDR files (Raw Data Record) for VIIRS, ATMS (Advanced Technology Micorwave Sounder) and CrIS (Cross-track Infrared Sounder)sensors. RDR are then transferred to a server equipped with CSPP2 (Community Satellite Processing Package) software developed by the University of

  5. Contamination control by laundry monitor at NPP

    International Nuclear Information System (INIS)

    Singh, Vishwanath P.; Rana, P.K.; Lokeshwar Rao, S.; Managanvi, S.S.

    2010-01-01

    The operation of nuclear power reactor produces electricity as well as small quantity of radioactive waste as gaseous, liquid and solid. The waste contains radionuclides produced by fission and activation in reactor systems with wide spectrum of energy and half life. The long-lived nuclides Sr, Cs, Ba, Iodine and Co etc compared to short-lived are important in view of radiation protection. The radioactive contamination on the materials, human body or other places where it is undesirable is enormously harmful to workers at Nuclear Power Plant (NPP). The spread of radioactive from controlled areas is very complex problem for power reactor plant management

  6. Preparation of NPP Dukovany periodic safety review

    International Nuclear Information System (INIS)

    Dubsky, L.; Vymazal, P.

    2004-01-01

    Dukovany NPP in Czech Republic performs a periodic safety review for the second time after approximately 20 years of operation. The history of the Safety Report and its transformation into an internationally accepted form complying with IAEA standards is described. The deterministic and probabilistic assessment of the plant's safety-related design and state is applied to determine whether and to what extend the relevant protective goals are fulfilled by the existing plant design. A description of the step-by-step process is presented together with the creation of methods and criteria for PSR evaluation prepared by Nuclear Research Institute Rez

  7. Chernobyl NPP accident: a year later

    International Nuclear Information System (INIS)

    Asmolov, V.G.; Borovoj, A.A.; Demin, V.F.

    1988-01-01

    Consideration is being given to measures on liquidation of Chernobyl accident aftereffects, conducted since August, 1986. One of the most important measures lay in construction of the ''shelter'', which must provide long-term conservation of accidental unit. Works on decontamination of reactor area and contaminated populated regions were continued. Measures on providing safety of population and its health protection were performed. An attention was paid to long-term investigations on studying delayed aftereffects of the accident, monitoring of invironment, development and introduction of measures on improving NPP safety. Prospects of further development of nuclear power engeneering and possibilities of improving its safety are considered

  8. WWER-type NPP spray ponds screen

    International Nuclear Information System (INIS)

    Nikolova, M.; Jordanov, M.; Denev, J.; Markov, D.

    2003-01-01

    The objective of this study is to develop a protection screen of WWER-type NPP spray ponds. The screen design is to ensure reduction of the water droplets blown by the wind and, if possible, their return back to the spray ponds. The cooling capacity of the ponds is not to be changed below the design level for safety reasons. Computational fluid dynamics analysis is used to assess the influence of each design variant on the behavior of the water droplets distribution. Two variants are presented here. The one with plants is found not feasible. The second variant, with steel screen and terrain profile modification is selected for implementation. (author)

  9. The accidents during shutdown conditions Temelin NPP

    International Nuclear Information System (INIS)

    Sykora, M.; Mlady, O.

    1996-01-01

    Two parallel activities oriented for the accidents during shutdown conditions are performed at Temelin NPP: Development of symptom based emergency operating procedures (EOPs) applicable for the accidents which could occur during operational modes 1 through 4; independent evaluation of plant safety as part of the Temelin Shutdown probabilistic assessment to define the accidents which could occur during mode 5 and 6 for which the EOPs must be extended. Both these activities are in progress now because Temelin plant is still in the construction phase

  10. Safe 15 Terawatt of Temelin NPP

    International Nuclear Information System (INIS)

    Sula, M.

    2010-01-01

    In this work author presents a project Safe 15 Terawatt realised on the Temelin NPP. This project is one of the eight key projects of the CEZ group, associated in the 'Programme of efficiency'. The project started in June 2007 with long-term goals for horizon of year 2012. The safety indicators will be reached of the first quarter level of world's nuclear power plant - by the end of the first decade. By the end of year 2012 we will have achieved annual production of 15 billion kWh - in the Czech Republic: 15 Terawatt.

  11. Social consequences of closing the Ignalina NPP

    International Nuclear Information System (INIS)

    Baubinas, R.; Burneika, D.

    2001-01-01

    The possible social consequences of closing the Ignalina Nuclear Power Plant are studied. The social and economical situation in Visaginas and in the Utena region as a precondition for possible social consequences is shown. Also, two main groups of factors that can possibly influence the situation in the labour market are analysed. The problems of the enterprises that create working places and of the inhabitants of Visaginas whose possible behaviour can affect the situation in the labour market are discussed. Also, some proposals to neutralize the social costs of closing the Ignalina NPP are made. (author)

  12. Characterization of Ignalina NPP RBMK Reactors Graphite

    International Nuclear Information System (INIS)

    Hacker, P.J.; Neighbour, G.B.; Levinskas, R.; Milcius, D.

    2001-01-01

    The paper concentrates on the investigations of the initial physical properties of graphite used in production of graphite bricks of Ignalina NPP. These graphite bricks are used as nuclear moderator and major core structural components. Graphite bulk density is calculated by mensuration, pore volumes are measured by investigation of helium gas penetration in graphite pore network, the Young's modulus is determined using an ultrasonic time of flight method, the coefficient of thermal expansion is determined using a Netzsch dilatometer 402C, the fractured and machined graphite surfaces are studied using SEM, impurities are investigated qualitatively by EDAX, the degree of graphitization of the material is tested using X-ray diffraction. (author)

  13. Students education and training for Slovak NPP

    International Nuclear Information System (INIS)

    Lipka, J.; Slugen, V.; Hascik, J.; Miglierini, M.

    2004-01-01

    Slovak University of Technology is the largest and also the oldest university of technology in Slovakia. Surely more than 50% of high-educated technicians who work nowadays in nuclear industry have graduated from this university. The Department of Nuclear Physics and Technology of the Faculty of Electrical Engineering and Information Technology as a one of seven faculties of this University feels responsibility for proper engineering education and training for Slovak NPP operating staff. The education process is realised via undergraduate (Bc.), graduate (MSc.) and postgraduate (PhD.) study as well as via specialised training courses in a frame of continuous education system. (author)

  14. Core power capability verification for PWR NPP

    International Nuclear Information System (INIS)

    Xian Chunyu; Liu Changwen; Zhang Hong; Liang Wei

    2002-01-01

    The Principle and methodology of pressurized water reactor nuclear power plant core power capability verification for reload are introduced. The radial and axial power distributions of normal operation (category I or condition I) and abnormal operation (category II or condition II) are simulated by using neutronics calculation code. The linear power density margin and DNBR margin for both categories, which reflect core safety, are analyzed from the point view of reactor physics and T/H, and thus category I operating domain and category II protection set point are verified. Besides, the verification results of reference NPP are also given

  15. Mochovce NPP safety improvement and completion

    International Nuclear Information System (INIS)

    1997-01-01

    6th Nuclear society information meeting dealt with the completion of the Mochovce NPP with regard to implementation of safety measures. It was aimed to next problems: I. 'Survey' presentation on the situation of the nuclear power industry in partner countries; II. Basic technical presentations; III. Presentations of operators of the other VVER 440/213 NPPs on their activities in the field of safety improvement in relation to IAEA recommendations; IV. Technical solutions of safety improvements ranked with IAEA degree 3 (Report SC 108 VVER); V: Technical solutions of selected Safety Measures ranked with IAEA degree 2 and 1 (Report SC 108 VVER)

  16. Calculation of NPP pipeline seismic stability

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Ambriashvili, Yu.K.; Kaliberda, I.V.

    1982-01-01

    A simplified design procedure of seismic pipeline stability of NPP at WWER reactor is described. The simplified design procedure envisages during the selection and arrangement of pipeline saddle and hydraulic shock absorbers use of method of introduction of resilient mountings of very high rigidity into the calculated scheme of the pipeline and performance of calculations with step-by-step method. It is concluded that the application of the design procedure considered permits to determine strains due to seismic loads, to analyze stressed state in pipeline elements and supporting power of pipe-line saddle with provision for seismic loads to plan measures on seismic protection

  17. Nuclear Oversight Function at Krsko NPP

    International Nuclear Information System (INIS)

    Bozin, B.; Kavsek, D.

    2010-01-01

    The nuclear oversight function is used at the Krsko NPP constructively to strengthen safety and improve performance. Nuclear safety is kept under constant examination through a variety of monitoring techniques and activities, some of which provide an independent review. The nuclear oversight function at the Krsko NPP is accomplished by Quality and Nuclear Oversight Division (SKV). SKV has completed its mission through a combination of compliance, performance and effectiveness-based assessments. The performance-based assessment is an assessment using various techniques (observations, interviews, walk-downs, document reviews) to assure compliance with standards and regulations, obtain insight into performance, performance trends and also to identify opportunities to improve effectiveness of implementation. Generally, the performance-based approach to oversight function is based on some essential elements. The most important one which is developed and implemented is an oversight program (procedure). The program focuses on techniques, activities and objectives commensurate with their significance to plant operational safety. These techniques and activities are: self-assessments, assessments, audits, performance indicators, monitoring of corrective action program (CAP), industry independent reviews (such as IAEA's OSART and WANO Peer Review), industry benchmarking etc. Graded approach is an inherent product of a performance based program and ranking process. It is important not only to focus on the highest ranked performance based attributes but to lead to effective utilization of an oversight program. The attributes selected for oversight need to be based on plant specific experience, current industry operating experience, supplier's performance and quality issues. Collaboration within the industry and effective utility oversight of processes and design activities are essential for achieving good plant performance. So the oversight program must integrate relevant

  18. Sociological investigations on Ignalina NPP and within its surroundings

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The purpose of this study was to determine the impact of Ignalina NPP and Visaginas town on the social territorial processes in the region and to reveal the impact of Ignalina NPP on the regional economic, social, demographic, political and cultural processes in the context of ecological and psychological affect. According to the results of this research three quarters of the inhabitants and the functionaries of local administration hold an opinion that operation of Ignalina NPP posses threat for the population and environment. Meanwhile they are sure that danger of Ignalina NPP is not critical. 21 - 35 % of the local administrators speak for the closure of Ignalina NPP , whereas half of Visaginas residents and three quarters of the local administrators indicate that operation of reactors is expedient. Over 90% of the population do not have sufficient information on the operation of Ignalina NPP. In the opinion of the rest Lithuanian people Ignalina NPP zone is related with the physical danger and the image of Visaginas residents as the 'others', 'strangers'. More than 90% of Ignalina NPP employees are Russian speaking, not native Lithuanians. The social relations of Visaginas with the environment are poor as a result of the situation of the town, lack of communications and cultural self isolation. (author)

  19. Selection of index complex for the NPP operator activity efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Kolesnik, A I; Chertorizhskij, E A

    1984-01-01

    Preconditions for choice of NPP operator activity efficiency index are determined. Results of the choice are given and a method for determination of generalized and particular parameters by means of which NPP operator activity efficiency can be estimated is considered. An algorithm of diagnosis of reason for unsuccess of operator activity based on assessment of psychological factors of complicacy is suggested.

  20. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities