WorldWideScience

Sample records for cern ps booster

  1. Study of an energy upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M E; Bartmann, W; Bartolome, S; Bertone, C; Blas, A; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Dahlen, P; Dobers, T; Findlay, A; Folch, R; Gilbert, N; Hansen, J; Hermanns, T; Jensen, S; Le Roux, P; Lopez-Hernandez, L A; Mahner, E; Masi, A; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Nonis, M; Olek, S; Paoluzzi, M; Pittet, S; Puccio, B; Raginel, V; Ruehl, I; Tan, J; Todd, B; Weterings, W; Widorski, W

    2011-01-01

    CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading for increased luminosity in the coming years. In order to overcome bottlenecks in the injector chain, an increase of the beam transfer energy from the CERN Proton Synchrotron Booster (PSB) to the Proton Synchrotron (PS) has been investigated as a possible upgrade scenario. This paper gives an overview of the technical solutions and summarizes the conclusions of the feasibility study.

  2. PS Booster - Festive colloquium

    CERN Document Server

    2012-01-01

    A festive colloquium will be held to celebrate the 40th anniversary of the PS Booster on Friday, 28 September at 2 p.m. in the CERN council chamber. The meeting will be open to everybody. Read more on the PS Booster in the CERN Bulletin and in the CERN Courier.

  3. Sources of Emittance Growth at the CERN PS Booster to PS Transfer

    CERN Document Server

    Bartmann, Wolfgang; Burkart, Florian; Goddard, Brennan; Jentzsch, Jennifer; Ostojić, Ranko

    2016-01-01

    The CERN PS Booster (PSB) has four vertically stacked rings. After extraction from each ring, the bunches are recombined in two stages, comprising septum and kicker systems, such that the accumulated bunch train is injected through a single line into the PS. Bunches from the four rings go through a different number of vertical bends, which leads to differences in the betatron and dispersion functions due to edge focussing. The fast pulsed systems at PSB extraction, recombination and PS injection lead to systematic errors of delivery precision at the injection point. These error sources are quantified in terms of emittance growth and particle loss. Mitigations to reduce the overall emittance growth at the PSB to PS transfer within the LHC injectors upgrade are presented.

  4. Reliability and maintenance analysis of the CERN PS booster

    CERN Document Server

    Staff, P S B

    1977-01-01

    The PS Booster Synchrotron being a complex accelerator with four superposed rings and substantial additional equipment for beam splitting and recombination, doubts were expressed at the time of project authorization as to its likely operational reliability. For 1975 and 1976, the average down time was 3.2% (at least one ring off) or 1.5% (all four rings off). The items analysed are: operational record, design features, maintenance, spare parts policy, operating temperature, effects of thunderstorms, fault diagnostics, role of operations staff and action by experts. (15 refs).

  5. Acceleration of lead ions in the CERN PS booster and the CERN PS

    CERN Document Server

    Blas, F; Cappi, R; Cyvoct, G; Garoby, R; Gelato, G; Haseroth, H; Jensen, E; Manglunki, Django; Metzmacher, K D; Pedersen, F; Rasmussen, N; Schindl, Karlheinz; Schneider, G C; Schönauer, Horst Otto; Sermeus, L; Thivent, M; Van Rooij, M; Völker, F V; Wildner, E

    1996-01-01

    The new CERN Heavy Ion Accelerating Facility also requires besides a new Linac substantial modifications of existing accelerators. They are imposed by the low speed and the low intensity of the ion beam and, crucially at low energy, by the short lifetime of the partially stripped ions due to charge exchange with the atoms of the residual gas. The upgraded vacuum system hits the limits of a non-bakeable machine and consequently the acceleration had to be sped up by all means. In the Booster this led to injection and RF capture on a fast-rising magnet cycle and a new digital RF beam control system. Beam current transformers had to be replaced by new, heavily shielded ones. Other modifications include a new staircase magnet to distribute ions over the four Booster rings, lengthening of septa and kicker pulses, plus new, bakeable extraction septa and an energy stabilizing RF loop on the flat top in the CPS, and a stripper in the transfer line to the SPS.

  6. LHC Pilot Bunches from the CERN PS Booster

    CERN Document Server

    Benedikt, Michael

    2003-01-01

    For the first commissioning phase of the LHC, a single proton bunch is required. The production of this so-called "LHC pilot bunch" will follow a different scheme than the one of the nominal LHC proton bunch train. Both the transverse and the longitudinal LHC bunch characteristics should already be established in the PS Booster. The parameter space for the LHC pilot bunch spans a factor 66 in beam brightness. To cover the whole parameter space, a mixture of several ingredients was required: intensity adjustment with low voltage rf-capture; definition of the transverse emittance with shavers; controlled blow-up followed by longitudinal shaving to define the longitudinal emittance. All beam variants were produced on harmonic two, with only one bunch being sent to the downstream accelerator chain. To cover also the lowest intensity side, the Linac beam was reduced by a factor 5 with a "sieve". The pilot bunches corresponding to the "corners" of the parameter space and a few selected inner reference points were s...

  7. Dispersion Matching of a Space Charge dominated Beam at Injection into the CERN PS Booster

    CERN Document Server

    Hanke, Klaus; Scrivens, Richard

    2005-01-01

    In order to match the dispersion at injection into the CERN PS Booster, the optics of the injection line was simulated using two different codes (MAD and TRACE). The simulations were benchmarked versus experimental results. The model of the line was then used to re-match the dispersion. Experimental results are presented for different optics of the line. Measurements with varying beam current show the independence of the measured quantity of space-charge effects.

  8. Adapting the CERN PS booster to oxygen acceleration

    International Nuclear Information System (INIS)

    After the successful experience of passing deuterons and alphas through the PSB for achieving more intense beams in the late ISR, it was decided to include the PSB in the CERN oxygen ion acceleration programme. Particular features of this project are: (i) development of high sensitivity instrumentation and low-level electronics to handle some 108 charges; (ii) RF gymnastics required to cover the large frequency range; (iii) operation of the ion programme while continuing to provide the other users with protons. New instrumentation, such as several types of beam transformer, are described. The extension of the radial position and phase detection systems towards these low intensities, enabling the beam to be accelerated in closed loop, is presented. Difficulties arising from the pulse-sharing mode (108 and 1013 chargesring to be accelerated on alternate cycles) are discussed in the light of recent beam tests

  9. Space Charge effects and mitigation in the CERN PS Booster, in view of the Upgrade

    CERN Document Server

    Benedetto, Elena; Forte, Vincenzo; Schmidt, Frank

    2016-01-01

    The CERN PS Booster (PSB) is presently running with a space charge tune spread larger than 0.5 at injection. Since the High Luminosity LHC (HL-LHC) will require beams with twice the intensity and brightness of today, the LHC Injector Upgrade (LIU) Project is putting in place an upgrade program for all the injector chain and, in particular, it relies on the important assumption that the PS Booster can successfully produce these beams after the implementation of the 160 MeV H- injection from Linac4. This contribution describes the studies (measure-ments and simulations) that have been carried out to con- firm that the PSB can indeed perform as needed in terms of beam brightness for the future HL-LHC runs. The importance of the mitigation measures already in place, such as the correction of the half-integer line, and the effects of non-linear resonances on the beam are also discussed.

  10. Longitudinal coupled-bunch instability around 1 GHZ at the CERN PS booster

    CERN Document Server

    Caspers, P; Schönauer, Horst Otto; Søby, L; Dyachkov, M

    1998-01-01

    The fast-growing "Ring 4" instability occurring at intensities above 6.5 1012 protons in the top one of the four rings of the CERN PS Booster (PSB) is finally explained by an asymmetry in the 40 vacuum pump manifolds common to all rings. Impedance measurements (by wire method) and numerical calculations show a sharp resonant peak (Q~2000) at 1100 MHz and shunt impedances two times higher for the Ring 4 ports as compared to the other rings. This factor is sufficient to explain that the threshold of the instability falls below the maximum intensity only in Ring 4. A final, but labor-intensive and expensive, cure consists of inserting short-circuiting sleeves into all 160 beam ports. Results of beam and impedance measurements and the planned cure will be presented and discussed

  11. CERN PS Booster space charge simulations with a realistic model for alignement and field errors

    CERN Document Server

    Forte, V; McAteer, M

    2014-01-01

    The CERN PS Booster is one of the machines of the LHC injector chain which will be upgraded within the LIU (LHC Injectors upgrade) project. The injection energy of the PSB will be increased to 160MeV in order to mitigate direct space charge effects, considered to be the main performance limitation, thus allowing to double the brightness for the LHC beams. In order to better predict the gain to be expected, space charge simulations are being carried out. Efforts to establish a realistic modeling of field and alignment errors aim at extending the basic model of the machine towards a more realistic one. Simulations of beam dynamics with strong direct space charge and realistic errors are presented and analysed in this paper.

  12. The new low frequency accelerating systems for the CERN PS booster

    CERN Document Server

    Krusche, A

    1998-01-01

    A set of four, ferrite-loaded, low-frequency RF cavities equipped with local RF feedback has been built and installed in the CERN PS Booster rings. Together with the modified existing RF systems they now serve for acceleration as well as RF gymnastics of protons and heavy ions up to the highest beam intensities. The systems specifications with a frequency range of about 0.6 to 1.8 MHz and a nomina l RF peak voltage of 8 kV satisfy specifically the requirements of acceleration on harmonic 1 of the future proton beam for the LHC. The system design has been guided by the request for safety margins for high beam intensity operation and ease of maintenance and repair. Some design aspects are presented as well as the performance achieved.

  13. Design of the New Wideband RF System for the CERN PS Booster

    CERN Document Server

    Paoluzzi, Mauro; Angoletta, Maria Elena; Arnaudon, Luca; Energico, Salvatore; Findlay, Alan; Haase, Matthias; Jaussi, Michael; Jones, Anthony; Landré, David; Molendijk, John; Quartullo, Danilo; Shaposhnikova, Elena

    2016-01-01

    For the renovation and upgrade of the CERN PS Booster (PSB) RF systems a development project was launched in 2012. The design, based on a new approach, aimed at replacing the existing tuned, narrowband RF systems with wideband, modular, solid-state driven units. A wide range of issues had to be addressed spanning from RF power production, radiation hardness of solid-state devices, active cancellation of beam-induced voltages, dedicated low-level electronics allowing multi-harmonic operation and beam stability. Following a three-year prototyping and testing campaign and two international reviews, the project endorsement came at the end of year 2015. It foresees the complete removal of present h1, h2 and h10 systems and the deployment of a new one covering all the frequency ranges from 1 MHz to 18 MHz. The four PSB rings will be equipped with 144 identical acceleration cells providing 24 kV total RF voltage per ring. This paper describes the design concepts, the retained solutions, the expected performances and...

  14. Shaping of proton distribution for raising the space-charge of the CERN PS Booster

    CERN Document Server

    Delahaye, J P; Magnani, L; Nassibian, G; Pedersen, F; Reich, K H; Schindl, Karlheinz; Schönauer, H O

    1980-01-01

    The intensity of the PS Booster is limited by space-charge defocusing forces which create a spread in the betatron tunes of up to Delta G approximately=0.5. Shaping of the transverse and longitudinal distributions was used for accommodating more particles in a given working area and enabled the Booster to accelerate 2*10/sup 13/ protons per pulse, twice the design intensity. Modifying the RF potential well by an experimental second harmonic cavity yields beam intensities and densities well beyond the present performance. The corresponding PSB experiments and improvements are described and an outlook on future developments is given. (14 refs).

  15. Shaping of proton distribution for raising the space-charge of the CERN PS booster

    International Nuclear Information System (INIS)

    The intensity of the PS booster is limited by space-charge defocusing forces which create a spread in the betatron tunes of up to ΔQ approximately equal to 0.5. Shaping of the transverse and longitudinal distributions was used for accommodating more particles in a given working area and enabled the Booster to accelerate 2 x 1013 protons per pulse, twice the design intensity. Modifying the RF potential well by an experimental second-harmonic cavity yields beam intensities well beyond the present performance. The corresponding PSB experiments and improvements are described and an outlook on future developments is given. (Auth.)

  16. The PS booster

    CERN Multimedia

    1972-01-01

    The PS booster which accelerates protons from the linac at an energy of 50 MeV to an energy of 800 MeV before injecting them into the main magnet ring of the synchrotron. The booster consists of four superposed rings. In the photograph can be seen the input beam line from the linac and the output beam lines, where beams from the four booster levels have been combined into two beams before final recombination.

  17. 3D Emittances Tailoring Techniques and Optimization with Space Charge for the Future CERN PS Booster Operations with Linac4

    CERN Document Server

    Forte, Vincenzo; Benedetto, Elena; Bracco, Chiara; Cieslak-Kowalska, Magdalena; Di Giovanni, Gian Piero

    2016-01-01

    In the frame of the LIU (LHC Injectors Upgrade) project, the CERN PS Booster is going to be renovated to host a new H⁻ charge-exchange injection from the Linac4. One important feature of the new injection scheme is the possibility to tailor a wide range of 3D emittances for CERN's different users in an intensity span in the order of 5·10⁹ to 1.6·10¹³ protons per PSB ring. This paper gives an overview of 3D multi-turn injection techniques, focusing on the future LHC beams, which aim at reaching high brightness, and on highest intensity beams (ISOLDE), where losses are the main concern. Complete RF capture simulations and transverse injection maps, including space charge effects, are presented and also intended to be used during the commissioning with Linac4.

  18. The PS Booster hits 40

    CERN Multimedia

    Joannah Caborn Wengler

    2012-01-01

    Many accelerators’ "round" birthdays are being celebrated at CERN these days – the PS turned 50 in 2009, the SPS was 35 in 2011, and this year it's the turn of the PS Booster to mark its 40th anniversary. Originally designed to accelerate 1013 protons to 800 MeV, it has far exceeded its initial design performance over the years.   The PS Booster in the 1970s. Imagine the scene: a group of accelerator physicists staring expectantly at a monitor, when suddenly a shout of joy goes up as a signal flickers across the screen. Does that sound familiar? Well, turn the clock back 40 years (longer hair, wider trouser legs) and you have the situation at the PS Booster on 26 May 1972. On that day, beam was injected into the Booster for the first time. “It was a real buzz,” says Heribert Koziol, then Chairman of the Running-in Committee. “We were very happy – and also a little relieved – when the beam finally...

  19. New space-charge methods in Accsim and their application to injection in the CERN PS Booster

    CERN Document Server

    Jones, F W

    1999-01-01

    The tracking and simulation code Accsim has recently been upgraded with new treatments of transverse space charge, one based on a conventional multiple-Fourier-transform technique and another using a new hybrid-fast-multipole (HFM) method. We present the application of the code to the study of multiturn injection in the CERN PS Booster in its LHC-injector-chain operation scenario. In particular, the ability of the HFM method to accurately model the turn-by-turn stacking and subsequent development of the beam is evaluated, especially its development near the sharp cutoff produced by beam loss on the injection septum. Results are compared with measured injection efficiencies and betatron amplitude distributions. (6 refs) .

  20. Studies on a wideband, solid-state driven RF system for the CERN PS booster

    CERN Document Server

    Paoluzzi, M M; Arnaudon, L; Chritin, N S; Mikulec, B; Hanke, K; Tardy, T

    2012-01-01

    In the framework of the LHC Injectors Upgrade project (LIU) the PS Booster (PSB) will undergo in depth consolidation and upgrade programs [1]. The aim is increasing the extraction energy to 2 GeV, exploiting the potential of Linac4 and allowing reliable operations during the next 25 years. For the RF system, substantial improvements could come from the replacement of the existing narrowband, tuned systems covering the h=1 and h=2 frequency ranges (0.6 ÷ 1.8 MHz and 1.2 ÷ 3.6 MHz respectively) with wideband (0.5 ÷ 4 MHz) Finemet® loaded cavities. The new system would be modular, allow multi-harmonic operation, use solid-state power stages and include fast RF feedback to compensate beam loading effects to some extent. A proof of principle system providing ≈3.0 kV accelerating voltage has been designed, constructed and installed in one of the PSB rings. This paper provides details on the design and measurements as well as information on the project status.

  1. Study of a Rapid Cycling Synchrotron to replace the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M E; Balhan, B; Bartmann, W; Benedikt, M; Borburgh, J; Bozzini, D; Carli, C; Dahlen, P; Dobers, T; Fitterer, M; Garoby, R; Gilardoni, S; Goddard, B; Hansen, J; Hermanns, T; Lopez-Hernandez, L A; Hourican, M; Jensen, S; Kosmicki, A; Meddahi, M; Mikulec, B; Newborough, A; Nonis, M; Olek, S; Paoluzzi, M; Pittet, S; Puccio, B; Raginel, V; Ruehl, I; Schönauer, H; Sermeus, L; Steerenberg, R; Tan, J; Tückmantel, J; Vretenar, M; Widorski, M

    2011-01-01

    CERN’s proton injector chain is undergoing a massive consolidation and upgrade program in order to deliver beams meeting the needs of the LHC Luminosity Upgrade. As an alternative to the upgrade of the existing Proton Synchrotron Booster (PSB), the construction of a Rapid Cycling Synchrotron (RCS) has been studied. This machine would replace the PSB and deliver beams to the LHC as well as to CERN’s rich fixed-target physics program. This paper summarizes the outcome of the feasibility study along with a tentative RCS design.

  2. Experience with ISOLDE molten metal targets at the CERN PS-Booster

    International Nuclear Information System (INIS)

    By moving the ISOLDE mass separators from the 600 MeV Synchrocyclotron (SC) to the 1 GeV-Booster Synchrotron the instantaneous energy density of the proton beam went up by 3 orders of magnitude. Sixteen molten targets and ion-source units have been used under pulsed proton beam conditions at ISOLDE between 1991 and 1995 and the development of the SC-units to match these requirements is described. Sets of baffles have been designed. Installed in the transfer lines which link the targets and the ion-sources they prevent splashes of the molten metals to flow into the ion sources. The liquid metal containment has been modified so that the electron beam welds are no longer in contact with the melt. A pyrocarbon disk inserted behind the proton beam obtained by spatial defocusing and time staggered extraction allowed to reduce the shock effect of the pulsed proton beam. (author) 7 figs., 8 refs

  3. Detailed magnetic model simulations of the H- injection chicane magnets for the CERN PS Booster Upgrade, including eddy currents and influence on beam dynamics

    CERN Document Server

    Benedetto, E; Borburgh, J; Carli, C; Martini, M; Forte, V

    2014-01-01

    The CERN PS Booster will be upgraded with an H- injection system. The chicanemagnets for the injection bump ramp-down in 5 ms and generate eddy currents in the inconel vacuum chamber which perturb the homogeneity of the magnetic field. The multipolar field components are extracted from 3D OPERA simulations and are included in the lattice model. The -beating correction is computed all along the ramp and complete tracking simulations including space-charge are performed to evaluate the impact of these perturbations and correction on beam dynamics.

  4. Evolution of High Intensity Beams in the CERN PS Booster after H⁻ Injection and Phase Space Painting

    CERN Document Server

    Cieslak-Kowalska, Magdalena; Benedetto, Elena; Bracco, Chiara

    2016-01-01

    With the LHC Injector Upgrade (LIU) project, the injection energy of PS Booster (PSB) ' first circular accelerator in the LHC injector chain ' will be raised from 50 MeV to 160 MeV and the present multiturn injection will be upgraded to H⁻ injection with transverse and longitudinal painting. In the scope of this project, it is planned to double the beam intensities, profiting from the fact that the βγ2 factor will be two times larger (0.35 at 50 MeV and 0.71 at 160 MeV), so the resulting tune spread driven by a direct space charge should remain similar. This paper describes the feasibility to double the intensity of high intensity and large emittance beams, looking into the evolution under space charge and taking into account losses constrains in the ring and in the extraction lines.

  5. CERN News: Slow ejection efficiency at the PS; Vacuum tests on the ISR; Fire in the neutrino beam-line; Prototype r.f . cavity for the Booster; Crane-bridge in ISR experimental hall; Modifications to the r.f . system at the PS

    CERN Multimedia

    1969-01-01

    CERN News: Slow ejection efficiency at the PS; Vacuum tests on the ISR; Fire in the neutrino beam-line; Prototype r.f . cavity for the Booster; Crane-bridge in ISR experimental hall; Modifications to the r.f . system at the PS

  6. Design study of the large hadron electron collider and a rapid cycling synchrotron as alternative to the PS booster upgrade at CERN

    Energy Technology Data Exchange (ETDEWEB)

    Fitterer, Miriam

    2013-02-22

    With the Large Hadron Collider (LHC) the exploration of particle physics at center of mass energies at the TeV scale has begun. To extend the discovery potential of the LHC, a major upgrade is foreseen around 2020 of the LHC itself and the LHC injectors - the chain of accelerators preparing the beam for the LHC. One of the injectors - the second one in the chain - is the Proton Synchrotron (PS) Booster. Its performance is currently limited by the space-charge effect, which is the effect of the electromagnetic field of the particle beam on itself. This effect becomes weaker with higher energy, and therefore an energy upgrade of the PS Booster to 2 GeV maximum beam energy is foreseen. As the PS Booster is with its 40 years already an old machine, the construction of a new accelerator, a Rapid Cycling Synchrotron (RCS), to replace the PS Booster has been proposed. In this thesis different options for the beam guidance in the RCS - referred to as lattice and optics - are studied, followed by a more general comparison of different lattices and optics and their performance under consideration of the space-charge effect. To further complement the LHC physics program, also the possibility of deep inelastic lepton-nucleon scattering at the LHC has been suggested, referred to as Large Hadron Electron Collider (LHeC). In this case the proton beam of the LHC collides with the electron beam, which is accelerated in a separate newly built machine. Two options are considered as electron accelerator: a new energy recovery linac - the Linac-Ring option - and the installation of an electron ring in the existing LHC tunnel - the Ring-Ring option. One of the main challenges of the Ring-Ring option is the integration of the electron ring in the current LHC tunnel. A layout, lattice and optics of the electron accelerator is developed in this thesis, which meets the requirements with regard to integration and reaches the beam parameters demanded by the particle physics experiments.

  7. Design study of the large hadron electron collider and a rapid cycling synchrotron as alternative to the PS booster upgrade at CERN

    International Nuclear Information System (INIS)

    With the Large Hadron Collider (LHC) the exploration of particle physics at center of mass energies at the TeV scale has begun. To extend the discovery potential of the LHC, a major upgrade is foreseen around 2020 of the LHC itself and the LHC injectors - the chain of accelerators preparing the beam for the LHC. One of the injectors - the second one in the chain - is the Proton Synchrotron (PS) Booster. Its performance is currently limited by the space-charge effect, which is the effect of the electromagnetic field of the particle beam on itself. This effect becomes weaker with higher energy, and therefore an energy upgrade of the PS Booster to 2 GeV maximum beam energy is foreseen. As the PS Booster is with its 40 years already an old machine, the construction of a new accelerator, a Rapid Cycling Synchrotron (RCS), to replace the PS Booster has been proposed. In this thesis different options for the beam guidance in the RCS - referred to as lattice and optics - are studied, followed by a more general comparison of different lattices and optics and their performance under consideration of the space-charge effect. To further complement the LHC physics program, also the possibility of deep inelastic lepton-nucleon scattering at the LHC has been suggested, referred to as Large Hadron Electron Collider (LHeC). In this case the proton beam of the LHC collides with the electron beam, which is accelerated in a separate newly built machine. Two options are considered as electron accelerator: a new energy recovery linac - the Linac-Ring option - and the installation of an electron ring in the existing LHC tunnel - the Ring-Ring option. One of the main challenges of the Ring-Ring option is the integration of the electron ring in the current LHC tunnel. A layout, lattice and optics of the electron accelerator is developed in this thesis, which meets the requirements with regard to integration and reaches the beam parameters demanded by the particle physics experiments.

  8. Measuring target for the PS Booster

    CERN Multimedia

    1971-01-01

    The measuring target for the PS Booster (originally 800 MeV, now 1.4 GeV). It measures the size of the beam by destroying all particles with amplitudes greater than the size of the fork, the position and width of which are adjustable. The plunging time is only 20 ms and the acceleration at the tip of the fork reaches 90 g. The servo-controlled linear motor is shown detached from the mechanism. See also 7602008.

  9. Position pickup of the PS Booster

    CERN Multimedia

    1975-01-01

    The beam position around the 4 rings of the PS Booster (originally 800 MeV, now 1.4 GeV), is measured with electrostatic pickups (PU). They consist of a ceramic cylinder forming part of the vacuum chamber, and, in order to save space, they are located inside the multipole lenses. The inside of the ceramic is coated with a metallic layer, into which the form of the electrodes was cut by computer-controlled micro-sandblasting. Each PU has a pair of horizontal and a pair of vertical electrodes, as well as a separate intensity-sensing circular electrode.

  10. The PS Booster Fast Wire Scanner

    CERN Document Server

    Burger, S; Priestnall, K; Raich, U

    2003-01-01

    The very tight emittance budget for LHC type beams makes precise emittance measurements in the injector complex a necessity. The PS machine uses 2 fast wire scanners per transverse plane for emittance measurement of the circulating beams. In order to ease comparison the same type of wire scanners have been newly installed in the upstream machine, the PS Booster, where each of the 4 rings is equipped with 2 wire scanners measuring the horizontal and vertical profiles. Those wire scanners use new and more modern control and readout electronics featuring dedicated intelligent motor movement controllers, which relieves the very stringent real time constraints due to the very high speed of 20m/s. In order to be able to measure primary beams at the very low injection energy of the Booster (50MeV) secondary emission currents from the wire can be measured as well as secondary particle flows at higher primary particle energies during and after acceleration. The solution adopted for the control of the devices is descri...

  11. MD on Head-Tail Instability in the PS Booster

    CERN Document Server

    Kornilov, V; Mikulec, B; Aumon, S; Rumolo, G

    2013-01-01

    Machine study experiments on the coherent instabilities appearing along the magnetic ramp have been performed at the CERN PS Booster synchrotron in the week of June 11-15, 2012. The space- and time structure of the head-tail instabilities was recorded by the triggered pick-up signals due to reproducibility of the occurrence time in the shot-by-shot sense. The intensity thresholds, the absolute growth rates and the mode structure have been compared for the bunches in the single-rf and in three types of the double-rf operation. The growth rates are compared to the instantaneous synchrotron frequencies, in the cases of the large corresponding ratio the head-tail mode structure is deformed by the driving impedance. Bunch parameters measurements indicate that the PSB bunches are in the regime of very strong transverse space-charge all along the magnetic ramp.

  12. LS1 Report: PS Booster prepares for beam

    CERN Multimedia

    Katarina Anthony

    2014-01-01

    With Linac2 already up and running, the countdown to beam in the LHC has begun! The next in line is the PS Booster, which will close up shop to engineers early next week. The injector will be handed over to the Operations Group who are tasked with getting it ready for active duty.   Taken as we approach the end of LS1 activities, this image shows where protons will soon be injected from Linac2 into the four PS Booster rings. Over the coming two months, the Operations Group will be putting the Booster's new elements through their paces. "Because of the wide range of upgrades and repairs carried out in the Booster, we have a very full schedule of tests planned for the machine," says Bettina Mikulec, PS Booster Engineer in Charge. "We will begin with cold checks; these are a wide range of tests carried out without beam, including system tests with power on/off and with varying settings, as well as verification of the controls system and timings." Amon...

  13. Multipole stack for the 4 rings of the PS Booster

    CERN Multimedia

    1976-01-01

    The PS Booster (originally 800 MeV, now 1.4 GeV) saw first beam in 1972, routine operation began in 1973. The strive for ever higher intensities required the addition of multipoles. Manufacture of 8 stacks of multipoles was launched in 1974, for installation in 1976. For details, see 7511120X.

  14. N$_2$ and Xe Gas Scintillation Cross-Section, Spectrum, and Lifetime Measurements from 50 MeV to 26 GeV at the CERN PS and Booster

    CERN Document Server

    Bosser, Jacques; MacCaferri, R; Plüm, M A

    2002-01-01

    Beam parameters in CERN's Proton Synchrotron (PS) accelerator must be controlled (and measured) with tighter precision than ever before to meet the stringent requirements of the Large Hadron Collider (LHC) programme. A non-destructive beam profile measurement system would be a valuable diagnostic tool. To this end, we measured N2 and Xe gas scintillation absolute cross-sections and lifetimes for proton beam energies from 1.4 to 25 GeV, which should prove valuable in the design and construction of a gas scintillation profile measurement system. We also measured relative cross-sections for proton beam energies between 0.05 and 1.4 GeV.

  15. Preparations for Upgrading the RF Systems of the PS Booster

    CERN Document Server

    Albright, Simon; Shaposhnikova, Elena

    2016-01-01

    The accelerators of the LHC injector chain need to be upgraded to provide the HL-LHC beams. The PS Booster, the first synchrotron in the LHC injection chain, uses three different RF systems (first, second and up to tenth harmonic) in each of its four rings. As part of the LHC Injector Upgrade the current ferrite RF systems will be replaced with broadband Finemet cavities, increasing the flexibility of the RF system. A Finemet test cavity has been installed in Ring 4 to investigate its effect on machine performance, especially beam stability, during extensive experimental studies. Due to large space charge impedance Landau damping is lost through most of the cycle in single harmonic operation, but is recovered when using the second harmonic and controlled longitudinal emittance blow-up. This paper compares beam parameters during acceleration with and without the Finemet test cavity. Comparisons were made using beam measurements and simulations with the BLonD code based on a full PS Booster impedance model. Thi...

  16. The HARP detector at the CERN PS

    CERN Document Server

    Catanesi, M G; Radicioni, E; Simone, S; Edgecock, R; Ellis, M; Robbins, S; Soler, F J P; Gößling, C; Mass, M; Bunyatov, S; Chukanov, A; Klimov, O; Krasin, I; Krasnoperov, A; Kustov, D; Popov, B; Serdiouk, V; Tereshchenko, V; Carassiti, V; Di Capua, E; Evangelisti, F; Vidal-Sitjes, G; Artamonov, A; Arce, P; Brocard, R; Decreuse, G; Friend, B; Giani, S; Gilardoni, S; Gorbunov, p; Grant, A; Grossheim, A; Gruber, P; Ivanchenko, V; Legrand, J C; Kayis-Topaksu,A; Panman, P; Papadopoulos, I; Pasternak, J; Chernyaev, E; Tsukerman, I; van der Vlugt, R; Veenhof, R; Wiebusch, C; Zucchelli, P; Blondel, A; Borghi, S; Campanelli, M; Cervera-Villanueva, A; Morone, M C; Prior, G; Schroeter, R; Kato, I; Gastaldi, Ugo; Mills, G B; Graulich, J S; Grégoire, G; Bonesini, M; Chignoli, F; Ferri, F; Paleari, F; Kirsanov, M; Postoev, V; Bagulya A; Grichine, V; Polukhina, N; Palladino, V; Coney, L; Schmitz, D; Barr, G; De Santo, A; Pattison, C; Zuber, K; Barichello, G; Bobisut, F; Gibin, D; Guglielmi, A; Laveder, M; Menegolli, A; Mezzetto M; Pepato, Adriano; Dumarchez, J; Troquereau, S; Vannucci, F; Dore, U; Iaciofano, A; Lobello, M; Marinilli, F; Orestano, D; Panayotov, D; Pasquali, M; Pastore, F; Tonazzo, A; Tortora, L; Booth, C; Buttar, C; Hodgson, P; Howlett, L; Nicholson, R; Bogomilovw, M; Burin, K; Chizhov, M; Kolev, D; Petev, P; Rusinov, I; Tsenov, R; Piperov, S; Temnikov, P; Apollonio, M; Chimenti, P; Giannini, G; Santin, G; Burguet-Castell, J; Gómez-Cadenas, J J; Novella, P; Sorel, M; Tornero, A

    2007-01-01

    HARP is a high-statistics, large solid angle experiment to measure hadron production using proton and pion beams with momenta between 1.5 and 15 GeV/c impinging on many different solid and liquid targets from low to high Z. The experiment, located in the T9 beam of the CERN PS, took data in 2001 and 2002. For the measurement of momenta of produced particles and for the identification of particle types, the experiment includes a large-angle spectrometer, based on a Time Projection Chamber and a system of Resistive Plate Chambers, and a forward spectrometer equipped with a set of large drift chambers, a threshold Cherenkov detector, a time-of-flight wall and an electromagnetic calorimeter. The large angle system uses a solenoidal magnet, while the forward spectrometer is based on a dipole magnet. Redundancy in particle identification has been sought, to enable the cross-calibration of efficiencies and to obtain a few percent overall accuracy in the cross-section measurements. Detector construction, operation an...

  17. The HARP detector at the CERN PS

    Science.gov (United States)

    Catanesi, M. G.; Muciaccia, M. T.; Radicioni, E.; Simone, S.; Edgecock, R.; Ellis, M.; Robbins, S.; Soler, F. J. P.; Gößling, C.; Mass, M.; Bunyatov, S.; Chukanov, A.; Klimov, O.; Krasin, I.; Krasnoperov, A.; Kustov, D.; Popov, B.; Serdiouk, V.; Tereshchenko, V.; Carassiti, V.; Di Capua, E.; Evangelisti, F.; Vidal-Sitjes, G.; Artamonov, A.; Arce, P.; Brocard, R.; Decreuse, G.; Friend, B.; Giani, S.; Gilardoni, S.; Gorbunov, P.; Grant, A.; Grossheim, A.; Gruber, P.; Ivanchenko, V.; Legrand, J.-C.; Kayis-Topaksu, A.; Panman, J.; Papadopoulos, I.; Pasternak, J.; Tcherniaev, E.; Tsukerman, I.; van der Vlugt, R.; Veenhof, R.; Wiebusch, C.; Zucchelli, P.; Blondel, A.; Borghi, S.; Campanelli, M.; Cervera-Villanueva, A.; Morone, M. C.; Prior, G.; Schroeter, R.; Kato, I.; Gastaldi, U.; Mills, G. B.; Graulich, J. S.; Grégoire, G.; Bonesini, M.; Chignoli, F.; Ferri, F.; Paleari, F.; Kirsanov, M.; Postoev, V.; Bagulya, A.; Grichine, V.; Polukhina, N.; Palladino, V.; Coney, L.; Schmitz, D.; Barr, G.; De Santo, A.; Pattison, C.; Zuber, K.; Barichello, G.; Bobisut, F.; Gibin, D.; Guglielmi, A.; Laveder, M.; Menegolli, A.; Mezzetto, M.; Pepato, A.; Dumarchez, J.; Troquereau, S.; Vannucci, F.; Dore, U.; Iaciofano, A.; Lobello, M.; Marinilli, F.; Orestano, D.; Panayotov, D.; Pasquali, M.; Pastore, F.; Tonazzo, A.; Tortora, L.; Booth, C.; Buttar, C.; Hodgson, P.; Howlett, L.; Nicholson, R.; Bogomilov, M.; Burin, K.; Chizhov, M.; Kolev, D.; Petev, P.; Rusinov, I.; Tsenov, R.; Piperov, S.; Temnikov, P.; Apollonio, M.; Chimenti, P.; Giannini, G.; Santin, G.; Burguet-Castell, J.; Gómez-Cadenas, J. J.; Novella, P.; Sorel, M.; Tornero, A.

    2007-02-01

    HARP is a high-statistics, large solid angle experiment to measure hadron production using proton and pion beams with momenta between 1.5 and 15 GeV/ c impinging on many different solid and liquid targets from low to high Z. The experiment, located in the T9 beam of the CERN PS, took data in 2001 and 2002. For the measurement of momenta of produced particles and for the identification of particle types, the experiment includes a large-angle spectrometer, based on a Time Projection Chamber and a system of Resistive Plate Chambers, and a forward spectrometer equipped with a set of large drift chambers, a threshold Cherenkov detector, a time-of-flight wall and an electromagnetic calorimeter. The large angle system uses a solenoidal magnet, while the forward spectrometer is based on a dipole magnet. Redundancy in particle identification has been sought, to enable the cross-calibration of efficiencies and to obtain a few percent overall accuracy in the cross-section measurements. Detector construction, operation and initial physics performances are reported. In addition, the full chain for data recording and analysis, from trigger to the software framework, is described.

  18. Multipole Stack for the 800 MeV PS Booster

    CERN Multimedia

    1975-01-01

    The 800 MeV PS Booster had seen first beam in its 4 superposed rings in 1972, routine operation began in 1973. In the strive for ever higher beam intensities, the need for additional multipole lenses became evident. After detailed studies, the manufacture of 8 stacks of multipoles was launched in 1974. Each stack consists of 4 superposed multipoles and each multipole has 4 concentric shells. From the innermost to the outermost shell, Type A contains octupole, skew-octupole, sextupole, skew-sextupole. Type B contains skew-octupole, skew-sextupole, vertical dipole, horizontal dipole. Completion of installation in 1976 opened the way to higher beam intensities. M. Battiaz is seen here with a multipole stack and its many electrical connections.

  19. A New CERN PS Transverse Damper

    CERN Document Server

    Blas, A; Benedetto, E; Caspers, Friedhelm; Glenat, D C; Louwerse, R; Martini, M; Métral, E; Rossi, V; Sladen, J

    2010-01-01

    Since 1999 the PS has been operated without active transverse damping thanks to an increase of the coupling between the transverse planes and the reduction of injection steering errors. Although the LHC requirements are met by these means, a new transverse feedback system has been commissioned to reinforce the robustness of operation and avoid the blow-up generated by residual injection steering errors. This system could also allow the reduction of the chromaticity and reduce the slow incoherent losses during the long PS injection plateau. It could also stabilize the high energy instabilities that appear occasionally with the LHC nominal beam and may be a limiting factor for ultimate LHC beam. Highlights include a signal processing with an automatic delay adapting itself to the varying revolution frequency, a programmable betatron phase adjustment along the cycle, pick-ups that have been re-furbished with electronics covering the very low frequency of the first betatron line and a compact wideband high-power ...

  20. The CERN PS/SL Controls Java Application Programming Interface

    International Nuclear Information System (INIS)

    The PS/SL Convergence Project was launched in March 1998. Its objective is to deliver a common control as infrastructure for the CERN accelerators by year 2001. In the framework of this convergence activity, a project was launched to develop a Java Application Programming Interface (API) between programs written in the Java language and the PS and SL accelerator equipment. This Java API was specified and developed in collaboration with TJNAF. It is based on the Java CDEV [1] package that has been extended in order to end up with a CERN/TJNAF common product. It implements a detailed model composed of devices organized in named classes that provide a property-based interface. It supports data subscription and introspection facilities. The device model is presented and the capabilities of the API are described with syntax examples. The software architecture is also described

  1. Electron cloud in the CERN accelerators (PS, SPS, LHC)

    OpenAIRE

    Iadarola, G.; Rumolo, G.

    2013-01-01

    Several indicators have pointed to the presence of an Electron Cloud (EC) in some of the CERN accelerators, when operating with closely spaced bunched beams. In particular, spurious signals on the pick ups used for beam detection, pressure rise and beam instabilities were observed at the Proton Synchrotron (PS) during the last stage of preparation of the beams for the Large Hadron Collider (LHC), as well as at the Super Proton Synchrotron (SPS). Since the LHC has started operation in 2009, ty...

  2. Evaluation of the broadband longitudinal impedance of the CERN PS

    CERN Document Server

    Damerau, H; Hancock, S; Migliorati, M; Palumbo, L; Persichelli, S; CERN. Geneva. ATS Department

    2012-01-01

    The CERN Proton Synchrotron (PS) produces beams well beyond its original parameters and especially the high-brightness beams delivered to the Large Hadron Collider are close to present stability limitations. Within the framework of the LHC Injectors Upgrade project, a signicant increase in beam intensity is planned. With this background, collective effects triggered by the self-induced electromagnetic elds, which are generated by the interaction of the beam with the surrounding environment, may play an important role in beam stability and machine performance. In this paper we study the short range wakeelds and the corresponding longitudinal broadband coupling impedance of the PS by measuring the incoherent quadrupole synchrotron frequency as a function of beam intensity and comparing the results with the evaluation of the contribution of several machine installations to the total impedance budget.

  3. The 1.4 GeV PS Booster in its tunnel.

    CERN Multimedia

    Patrice Loïez

    2002-01-01

    The PS Improvement Programme, launched as early as 1964, had a "Booster" as the key element in the quest for higher beam intensity and density. These were limited in the PS at injection of the 50 MeV proton beam from the linac by the incoherent (Laslett-) Q-shift. Boosting the linac beam to 800 MeV would raise the PS intensity limit by an order of magnitude, from 1E12 protons per pulse to 1E13. The main motivation was the supply of intense beams to the ISR. Soon, the Booster proved to be crucial for the neutral current experiment. A unique feature of the Booster are its 4 superposed rings. Its lattice is also unusual: between its 32 bending magnets, every second straight section contains a quadrupole triplet (F,D,F), while the alternate ones are drift spaces (mostly filled with essential components like septa, kickers, RF-cavities, etc.). In each picture we see one of the 16 periods. Following the direction of the beam from right to left: a bending magnet (green); an empty straight section; a bending magnet; ...

  4. Upgrade Strategies for the Proton Synchrotron Booster Dump at CERN

    CERN Document Server

    Sarrio Martinez, A; Maglioni, C

    2012-01-01

    CERN’s LHC Injection chain Upgrade (LIU) involves a revision of the Proton Synchrotron Booster dump, which was designed in the 1960’s to cope with beam energies reaching 800 MeV and intensities of 1e+13 particles per pulse. Thermo-mechanical studies highlighted the need for an upgrade of the dump, so that it is capable of withstanding energies in the order of 2 GeV and intensities up to 1e+14 particles per pulse. This paper proposes a new design of the dump in the light of various constraints and choices such as the geometry, materials and the integration of the required cooling system. Further topics discussed include the strategy for dismantling the old device, which has been continuously irradiated for almost 40 years and presents a difficult access. Therefore, a detailed ALARA procedure is being prepared in order to carry out the upgrade works in the area.

  5. Injection Bump Synchronization Study for the CERN PS

    CERN Document Server

    Serluca, Maurizio; Gilardoni, Simone; CERN. Geneva. ATS Department

    2016-01-01

    In the framework of the LHC Injector Upgrade (LIU) project the CERN PS injection kinetic energy will be upgraded from 1.4 to 2 GeV. The present injection bump is made by four bumpers in Straight Section (SS) 40, 42, 43, 44 and it will be converted in a five bumpers system to allow additional flexibility in the bump shape with a reduction of the proton losses during the bump closure. The injection section SS42 has being redesigned to accommodate a new eddy current septum which will host a new bumper magnet in the same vacuum vessel due to reduced longitudinal space availability. The synchronization and amplitude variation of the power converter of the in-vacuum bumper 42 with respect to the remaining outside vacuum bumpers 40, 41, 43, 44 can lead to orbit distortion and consequent losses during injection. In this note we present the experimental results from Machine Development (MD) studies along with simulations for the present system at 1.4 GeV to quantify the acceptable orbit distortion and the performance ...

  6. A search for sterile neutrinos at CERN-PS

    International Nuclear Information System (INIS)

    The LSND experiment has observed a 3.8 sigma excess of ν-bar e events from an ν-bar μ beam coming from pions at rest. If confirmed, the LSND anomaly would imply new physics beyond the standard model. The MiniBooNE experiment shows a 1.6 σ disagreement with LSND results, but it introduces an unexplained, new 3.0 sigma anomaly at lower energies, down to 200 MeV. The proposal for a new experiment based on two liquidArgon TPCs at CERN-PS is presented in this paper. The superior quality of the Liquid Argon imaging TPC and its unique electron - pi-zero discrimination allow full rejection of the NC background, without efficiency loss for electron neutrino detection. The use of two detectors at a near and a far location enables to minimize the effects of systematic uncertainties related to the neutrino beam and to the neutrino cross-sections. This experiment could collect 106 charged current events in two years data taking, thus allowing for a high priecision and high statistics study of the LSND and MiniBoone anomalies.

  7. ACTIVE LONGITUDINAL PAINTING FOR THE H-CHARGE EXCHANGE INJECTION OF THE LINAC4 BEAM INTO THE PS BOOSTER

    CERN Document Server

    CARLI, C; CERN. Geneva. AB Department

    2008-01-01

    Linac4 will provide 160 MeV H- to the PS Booster synchrotron. The H-beam will be injected by charge exchange injection allowing injecting several times into the same volumes of phase space. Thus, a large number of turns can be injected with high efficiencies and â€ワpainting” in order to shape the initial particle distribution for optimum performance becomes possible. In particular, a chopper makes longitudinal painting possible in addition to painting in transverse phase spaces. The slow synchrotron motion in the PS Booster implies an active longitudinal painting scheme, where the Linac4 output energy is modulated. Several active longitudinal painting schemes are presented. One scheme, based on a triangular Linac energy modulation, is proposed for the PS Booster H- injection with Linac4.

  8. Design of Air-Cooled Beam Dump for Extraction Line of PS Booster

    CERN Document Server

    Perillo-Marcone, A; Venturi, V; Antonakakis, T; Vlachoudis, V; Nowak, E; Mason, G; Battistin, M; Czapski, M; Sgobba, S

    2013-01-01

    A new beam dump has been designed, which withstands the future proton beam extracted from the Proton Syncrotron Booster (PSB) at CERN, consisting of up to 1E14 protons per pulse at 2 GeV after its upgrade in 2018/2019. In order to be able to efficiently release the deposited heat, the new dump will be made out of a single cylindrical block of a copper alloy and cooled by forced ventilation. In order to determine the energy density distribution deposited by the beam in the dump, Monte Carlo simulations were performed using FLUKA, and thermomechanical analyses carried out by importing the energy density into Ansys. In addition, CFD simulations of the airflow were carried out in order to accurately estimate the heat transfer convection coefficient on the surface of the dump. This paper describes the design process and highlights the constraints of integrating a new dump for increased beam power into the existing facility.

  9. Lead ion beam emittance and transmission studies in the PS-SPS complex at CERN

    CERN Document Server

    Arduini, Gianluigi; Bohl, T; Burkhardt, H; Cappi, R; Carter, C; Cornelis, Karel; Dach, M; de Rijk, G; Faugier, A; Ferioli, G; Jakob, H; Jonker, M; Manglunki, Django; Martini, G; Martini, M; Riunaud, J P; Scheidenberger, C; Vandorpe, B; Vos, L; Zanolli, M

    1996-01-01

    In the Lead Ion Facility at CERN [1] Pb53+ ion beams are accelerated up to a kinetic energy of 4.2 GeV/u in the CERN PS, extracted and stripped to Pb82+ in the transfer line from PS to SPS where they are injected and accelerated up to 157 GeV/u. The stripping efficiency, emittance growth and energy loss in Al strippers of different thicknesses have been measured and they are in good agreement with the theoretical values. The results of these measurements and considerations on the PS-SPS transmission efficiency are presented. [1] D. Warner, ed., ŒCERN Heavy-Ion Facility Design Report¹, CERN 93-01.

  10. High Energy Booster Options for a Future Circular Collider at CERN

    CERN Document Server

    Stoel, Linda; Bartmann, Wolfgang; Burkart, Florian; Goddard, Brennan; Herr, Werner; Kramer, Thomas; Milanese, Attilio; Rumolo, Giovanni; Shaposhnikova, Elena

    2016-01-01

    In case a Future Circular Collider for hadrons (FCC-hh) is constructed at CERN, the tunnels for SPS, LHC and the 100 km collider will be available to house a High Energy Booster (HEB). The different machine options cover a large technology range from an iron-dominated machine in the 100 km tunnel to a superconducting machine in the SPS tunnel. Using a modified LHC as reference, these options are compared with respect to their energy reach, magnet technology and filling time of the collider. Potential issues with beam transfer, reliability and beam stability are presented.

  11. Beam tests of MedAustron RF-jump at CERN’s PS Booster

    CERN Document Server

    Angoletta, M E; Hancock, S; Dorda, U

    2013-01-01

    MedAustron is a centre for ion beam cancer therapy (protons and carbon ions) and non-clinical research currently under construction in Wiener-Neustadt (Austria). MedAustron’s synchrotron Low-Level RF (LLRF) system is being developed in collaboration with CERN’s RF group. As part of the preparation of the beam for the betatron-core driven, horizontal third order slow resonant extraction, an RF-jump to the unstable phase must be executed which creates a uniform momentum spread of fixed width. A conceptual feasibility study of this RF-gymnastic was carried out during the 2012 run at CERN’s PS Booster (PSB). This consisted of several machine development sessions where the beam in PSB ring 4 was accelerated via a prototype Digital LLRF (DLLRF) system and a jump to the unstable phase and back was carried out in a controlled way. The aim of the study was to define the beam control features required to carry out this RF gymnastic and if possible to validate their implementation. This note describes the MedAu...

  12. Beam Quality Preservation in the CERN PS-SPS Complex

    CERN Document Server

    Arduini, Gianluigi

    2004-01-01

    The LHC will require beams of unprecedented transverse and longitudinal brightness. Their production imposes tight constraints on the emittance growth in each element of the LHC injector chain, namely the PS-SPS Accelerator Complex. The problems encountered at the different stages of the acceleration in the complex span a wide range of topics, such as injection matching, RF gymnastics, space charge, transverse and longitudinal single- and coupled-bunch instabilities, and electron cloud effects. The measurement techniques developed and applied to identify and study the various sources of emittance dilution to the high precision required for the LHC beams and the solutions found to control such phenomena are illustrated.

  13. Supervision Application for the New Power Supply of the CERN PS (POPS)

    CERN Document Server

    Milcent, H; Gonzalez-Berges, M; Voitier, A

    2011-01-01

    The power supply system for the magnets of the CERN PS has been recently upgraded to a new system called POPS (POwer for PS). The old mechanical machine has been replaced by a system based on capacitors. The equipments as well as the low level controls have been provided by an external company (CONVERTEAM). The supervision application has been developed at CERN reusing the technologies and tools used for the LHC Accelerator and Experiments (UNICOS and JCOP frameworks, SIMATIC WinCC Open Architecture SCADA tool). The paper describes the full architecture of the control application, and the challenges faced for the integration with an outsourced system. The benefits of reusing the CERN industrial control frameworks and the required adaptations will be discussed. Finally, the initial operational experience will be presented.

  14. Beams in the CERN PS complex after the RF upgrades for LHC

    CERN Document Server

    Blas, A; Garoby, R; Hancock, S; Schindl, Karlheinz; Vallet, J L

    1998-01-01

    In preparation for the Large Hadron Collider (LHC), extensive modifications have been made to the RF equipment of the PS Booster (PSB) and of the PS during the winter shut down 97-98. Low-frequency RF systems (0.6 - 1.8 MHz and 1.2 - 3.9 MHz) have been installed in the PSB and fixed frequency (40 and 80 MHz) systems in the PS. The longitudinal characteristics of all beams are changed to make the best use of the new capabilities. This paper summarises the characteristics of the new equipment and describes the RF gymnastics used to generate the various beams. The performances achieved so far ar e reported and compared to former results. Future plans are sketched.

  15. Simulation of Instability at Transition Energy with a New Impedance Model for CERN PS

    CERN Document Server

    Wang, Na; Biancacci, Nicolo; Migliorati, Mauro; Persichelli, Serena; Sterbini, Guido

    2016-01-01

    Instabilities driven by the transverse impedance are proven to be one of the limitations for the high intensity reach of the CERN PS. Since several years, fast single bunch vertical instability at transition energy has been observed with the high intensity bunch serving the neu-tron Time-of-Flight facility (n-ToF). In order to better understand the instability mechanism, a dedicated meas-urement campaign took place. The results were compared with macro-particle simulations with PyHEADTAIL based on the new impedance model developed for the PS. Instability threshold and growth rate for different longitu-dinal emittances and beam intensities were studied.

  16. Measurements at TRIUMF on a 80 MHz Cavity Model for the CERN PS Upgrade for LHC.

    Science.gov (United States)

    Mitra, A. K.; Poirier, R. L.; Losito, R.

    1997-05-01

    The RF system of the CERN PS being upgraded to bunch a beam that can be captured by the SPS 200 MHz RF system for injection into LHC. Two identical 80 MHz cavities are part of this PS upgrade programme. At CERN, the cavity has been designed using SUPERFISH and MAFIA concerning its shape, tuning devices and amplifier coupling loop. TRIUMF has built a simplified full-scale, copper-lined, wooden model, designed such that the field patters of the fundamental accelerating mode and the longitudinal modes agree closely to CERN cavity ones. The aim of constructing the wooden model was primarily to check the design of the capacitive tuners, the power coupling loop and the HOM dampers for the longitudinal modes up to 1 GHz. The results of the measurements were used to define the parameters of the tuners and a reliable model to describe the interaction of the coupling look with the fundamental mode of the final CERN cavity. Five quarter-wave antennae are adequate to damp the first fifteen longitudinal modes. In order not to decrease the shunt impedance of the fundamental mode by more than 5%, a three-element filter has been used with the antenna which damps the first longitudinal mode at 256 MHz.

  17. Upgrade of the CERN Proton Synchrotron Booster bending magnets for 2 GeV Operation

    CERN Document Server

    Newborough, A; Chritin, R

    2013-01-01

    Since its first operation in 1972 at an energy of 800MeV the CERN Proton Synchrotron Booster, which consists of 4 super imposed synchrotrons, has seen two upgrades: once to 1.0 GeV in 1988 and then to 1.4 GeV in 1999. During this time the main magnets of the machine have remained largely unchanged with small differences (<1%) between the inner and outer gaps of the main bending magnet fields being compensated by trim power supplies. The future upgrade of the machine will demand to extract protons at an energy of 2.0 GeV and require almost double the original dipole field. At this field, due to saturation effects, the inner and outer gaps of the main dipole magnets will differ by up to 4%. This paper presents the design and implementation of a modification of the magnetic circuit strongly reducing these effects. We also discuss the results of experimental tests concerning the effects on field quality and eddy current transients, including the implications for the real-time magnetic field measurement system ...

  18. Studies of Space Charge Effects in the Proposed CERN PS2

    Energy Technology Data Exchange (ETDEWEB)

    Qiang, Ji; /LBL, Berkeley; Ryne, Robert; /LBL, Berkeley; De Maria, Riccardo; /Brookhaven; Macridin, Alexandru; /Fermilab; Spentzouris, Panagiotis; /Fermilab; Papaphilippou, Yannis; /CERN; Wienands, Ulrich; /SLAC

    2012-06-22

    A new proton synchrotron, the PS2, is under design study to replace the current proton synchrotron at CERN for the LHC upgrade. Nonlinear space charge effects could cause significant beam emittance growth and particle losses and limit the performance of the PS2. In this paper, we report on studies of the potential space-charge effects at the PS2 using three-dimensional self-consistent macroparticle tracking codes, IMPACT, MaryLie/IMPACT, and Synergia. We will present initial benchmark results among these codes. Effects of space-charge on the emittance growth, especially due to synchrotron coupling, aperture sizes, initial painted distribution, and RF ramping scheme will also be discussed.

  19. Progress in space-charge limited machines: Four times the design intensity in the CERN Proton Synchrotron Booster

    International Nuclear Information System (INIS)

    Starting from rather modes performances, the CERN Proton Synchrotron Booster has now reached its sum-of-four-rings design intensity of 1013 protons per pulse in each ring, featuring the outstanding maximum space-charge tune shift of 0.6 units. The latter requires dynamic compensation of half and (even systematic) third integer stopbands. More measures were introduced to push the intensity ceiling higher: careful choice of working area, controlled linear coupling to enhance injection efficiency and to fill the full aperture with a better-suited transverse charge distribution; bunch shaping by addition of a second-harmonic RF system, beam loading compensated by fast feedback; RF feedforward in the fundamental cavities; feedback systems taming longitudinal coupled-bunch instabilities, and transverse wide-band dampers replacing octupoles previously used. The article reviews these techniques as well as some of the Booster's unique beam diagnostics, crucial to the achievement of these performances

  20. The Low-Level Control System for the CERN PS Multi-Turn Extraction Kickers

    CERN Document Server

    Schipper, J; Boucly, C; Carlier, E; Fowler, T; Gaudillet, H; Noulibos, R; Sermeus, L

    2010-01-01

    To reduce the beam losses when preparing high intensity proton beam for the CERN Neutrino to Gran Sasso (CNGS) facility, a new Multi-Turn extraction (MTE) scheme has been implemented in the PS, to replace the present Continuous Transfer (CT) to the SPS. Industrial off-the-shelf components have been used for the low-level part of the MTE kicker control system. National Instruments PXI systems are used to control the high voltage pulse generators and a SIEMENS programmable logic controller (PLC) handles the centralised oil cooling and gas insulation sub-systems

  1. Control protocol: large scale implementation at the CERN PS complex - a first assessment

    Energy Technology Data Exchange (ETDEWEB)

    Abie, H. (CERN, 1211, Geneva 23 (Switzerland)); Benincasa, G. (CERN, 1211, Geneva 23 (Switzerland)); Coudert, G. (CERN, 1211, Geneva 23 (Switzerland)); Davydenko, Y. (CERN, 1211, Geneva 23 (Switzerland)); Dehavay, C. (CERN, 1211, Geneva 23 (Switzerland)); Gavaggio, R. (CERN, 1211, Geneva 23 (Switzerland)); Gelato, G. (CERN, 1211, Geneva 23 (Switzerland)); Heinze, W. (CERN, 1211, Geneva 23 (Switzerland)); Legras, M. (CERN, 1211, Geneva 23 (Switzerland)); Lustig, H. (CERN, 1211, Geneva 23 (Switzerland)); Merard, L. (CERN, 1211, Geneva 23 (Switzerland)); Pearson, T. (CERN, 1211, Geneva 23 (Switzerland)); Strubin, P. (CERN, 1211, Geneva 23 (Switzerland)); Tedesco, J. (CERN, 1211, Geneva 23 (Switzerland))

    1994-12-15

    The Control Protocol is a model-based, uniform access procedure from a control system to accelerator equipment. It was proposed at CERN about 5 years ago and prototypes were developed in the following years. More recently, this procedure has been finalized and implemented at a large scale in the PS Complex. More than 300 pieces of equipment are now using this protocol in normal operation and another 300 are under implementation. These include power converters, vacuum systems, beam instrumentation devices, RF equipment, etc. This paper describes how the single general procedure is applied to the different kinds of equipment. The advantages obtained are also discussed. ((orig.))

  2. Control protocol: large scale implementation at the CERN PS complex - a first assessment

    International Nuclear Information System (INIS)

    The Control Protocol is a model-based, uniform access procedure from a control system to accelerator equipment. It was proposed at CERN about 5 years ago and prototypes were developed in the following years. More recently, this procedure has been finalized and implemented at a large scale in the PS Complex. More than 300 pieces of equipment are now using this protocol in normal operation and another 300 are under implementation. These include power converters, vacuum systems, beam instrumentation devices, RF equipment, etc. This paper describes how the single general procedure is applied to the different kinds of equipment. The advantages obtained are also discussed. ((orig.))

  3. Supervision application for the new power supply of the CERN PS (POPS)

    International Nuclear Information System (INIS)

    The power supply system for the magnets of the CERN PS (Proton Synchrotron) has been recently upgraded to a new system called POPS (Power for PS). The old mechanical machine has been replaced by a system based on capacitors. The equipment as well as the low level controls have been provided by an external company (CONVERTEAM). The supervision application has been developed at CERN reusing the technologies and tools used for the LHC Accelerator and Experiments (UNICOS and JCOP frameworks, SIMATIC WinCC Open Architecture SCADA tool). The POPS control system architecture is a 3 layer control system. The first layer is the field layer with remote input/output module connected to the control layer. This layer is composed of WAGO modules interfaced with the control layer via the PROFIBUS field-bus. The second layer is the control layer with CONVERTEAM hardware and software based on VME cards, holding the closed control loops and the voltage and capacitors control. The CONVERTEAM control system is distributed over four CPUs and remote IO modules. Each CPU is monitoring the link with the Supervision layer; the interruption of the communication stops the powering of the system. The third layer is the supervision layer. In this layer, process views are provided for the monitoring and the control/command interface of the control system. Other typical functions (e.g. archiving, trending, alarm handling) are also provided by this layer. The paper describes the full architecture of the control application, and the challenges faced for the integration with an out-sourced system. The benefits of reusing the CERN industrial control frameworks and the required adaptations will be discussed. Finally, the initial operational experience will be presented

  4. IMPEDANCE CONSIDERATIONS FOR THE DESIGN OF THE VACUUM SYSTEM OF THE CERN PS2

    Energy Technology Data Exchange (ETDEWEB)

    Bane, K.L.F.; Stupakov, G.; Wienands, U.; Benedikt, M.; Grudiev, A.; Mahner, E.; /SLAC /CERN

    2010-08-26

    In order for the LHC to reach an ultimate luminosity goal of 10{sup 35}/cm{sup 2}/s, CERN is considering upgrade options for the LHC injector chain, including a new 50 GeV synchrotron of about 1.3 km length for protons and heavy ions, to be called the PS2 [1]. The proton energy will be ramped from 4 GeV to 50 GeV in 1.2 s, and the design proton current for LHC operation is 2.7 A. In the LARP framework, we are studying the instability thresholds and the impedance requirements of the vacuum system for the PS2. Goal of this study is to develop an impedance budget for the machine. We consider the standard single and multi-bunch collective effects that may be an issue in the PS2. For single bunch, we study the microwave instability and the transverse mode coupling instability (TMCI); for multi-bunch, the transverse coupled bunch instability. While the impedance budget will include many components in the machine, at present, we only have sufficient information to include the resistance of the beam pipe, the vacuum flanges that connect the various pieces of the vacuum chamber, and space charge impedance in our estimate. Note that earlier estimates of the impedance and its effects in the PS2 can be found in Ref. [2]. Table 1 presents selected PS2 parameters that will be used in the calculations. The equations used, unless indicated otherwise, can be found in Ref. [3].

  5. A Directory Service for the CERN PS/SL Java Programming Interface

    International Nuclear Information System (INIS)

    The CERN PS and SL accelerator control groups developed a common application programming interface (API) in Java [1]. Part of this API is a directory service that provide information about the underlying hardware and software. With this information, it is possible to write generic programs that do general actions on lists of devices without hard coding of device names. And, starting from a device name, full details about related devices, the device itself and its class and properties, can be obtained, including the meaning of bits and bit-patterns in status words. The interface definition is independent of any implementation but a reference implementation is provided using Java Database Connectivity (JDBC) against a set of tables in a relational database. Data from very different systems can be brought together and presented in a uniform way to the user. The full potential of the directory service is reached when it is used in software components (Java Beans)

  6. The Merit(nTOF-11) High Intensity Liquid Mercury Target Experiment at the CERN PS

    CERN Document Server

    Efthymiopoulos, I; Caretta, O; Carroll, A J; Fabich, A; Graves, V B; Grudiev, A; Haug, F; Kirk, H G; Lettry, Jacques; Loveridge, P; McDonald, K T; Mokhov, N; Palm, M; Park, H; Pernegger, H; Spampinato, P T; Steerenberg, R; Striganov, S; Tsang, T

    2008-01-01

    The MERIT(nTOF-11) experiment is a proof-ofprinciple test of a target system for a high power proton beam to be used as front-end for a neutrino factory or a muon collider. The experiment took data in autumn 2007 with the fast-extracted beam from the CERN Proton Synchrotron (PS) to a maximum intensity of $30 × 10^{12}$ per pulse. The target system, based on a free mercury jet, is capable of intercepting a 4-MW proton beam inside a 15-T magnetic field required to capture the low energy secondary pions as the source for intense muon beams. Partice detectors installed around the target setup measure the secondary particle flux out of the target and can probe cavitation effects in the mercury jet when excited by an intense proton beam.Preliminary results of the data analysis will be presented here.

  7. The application software of the CERN PS accelerator controls system - analysis of its cost and resources

    International Nuclear Information System (INIS)

    The CERN PS accelerators have evolved into one of the world's most sophisticated high energy physics facility. The variety of beams and their high repetition rate means that a most sophisticated controls system is required. This reflects on the application software. At the time of the completion of the new control system, nearly 1000 programs, amounting to around 450 000 lines of code, have been developed at the cost of approximately 120 man-years. The span of this software ranges from real-time application programs to special purpose development and management tools. This paper documents the cost, resources and production of this software project. These are analyzed in terms of the structure of the application software. Rules-of-thumb are suggested for estimating the required effort at various phases of the project and to define the implementation strategy. (orig.)

  8. Workstations as consoles for the CERN-PS complex, setting-up the environment

    International Nuclear Information System (INIS)

    Within the framework of the rejuvenation project of the CERN control systems, commercial workstations have to replace existing home-designed operator consoles. RISC-based workstations with UNIX, X-windowTM and OSF/MotifTM have been introduced for the control of the PS complex. The first versions of general functionalities like synoptic display, program selection and control panels have been implemented and the first large scale application has been realized. This paper describes the different components of the workstation environment for the implementation of the applications. The focus is on the set of tools which have been used, developed or integrated, and on how we plan to make them evolve. (author)

  9. Engineering a large application software project: the controls of the CERN PS accelerator complex

    International Nuclear Information System (INIS)

    The CERN PS accelerator complex has been progressively converted to full computer controls without interrupting its full-time operation (more than 6000 hours per year with on average not more than 1% of the total down-time due to controls). The application software amounts to 120 man-years and 450'000 instructions: it compares with other large software projects, also outside the accelerator world: e.g. Skylab's ground support software. This paper outlines the application software structure which takes into account technical requirements and constraints (resulting from the complexity of the process and its operation) and economical and managerial ones. It presents the engineering and management techniques used to promote implementation, testing and commissioning within budget, manpower and time constraints and concludes with experience gained

  10. A Directory Service for the CERN PS/SL Java Programming Interface

    CERN Document Server

    Charrue, P; Di Maio, F; Kostro, K; Watson, W

    1999-01-01

    The CERN PS and SL accelerator control groups developed a common application programming interface (API) in Java [1]. Part of this API is a directory service that provides information about the underlying hardware and software. With this information it is possible to write generic programs that do general actions on lists of devices without hard coding of device names. And, starting from a device name, full details about related devices, the device itself and its class and properties, can be obtained, including the meaning of bits and bitpatterns in status words. The interface definition is independent of any implementation but a reference implementation is provided using Java Database Connectivity (JDBC) against a set of tables in a relational database. Data from very different systems can be brought together and presented in a uniform way to the user. The full potential of the directory service is reached when it is used in software components (Java Beans).

  11. New Control Structure of the 10 MHz RF System in the CERN PS

    CERN Document Server

    Damerau, H

    2013-01-01

    The 10MHz cavities comprise the main RF system in the CERN PS and the only one that allows acceleration. In total 11 tunable cavities (10 operational and a hot spare, grouped into 3+1 tuning groups and up to presently 6 voltage program groups) are distributed all around the circumference of the PS ring. Next to the RF drive signal each of the cavities is controlled by a voltage program and timing pulses to open and close the relays to short-circuit the cavity gaps. These control signals are presently generated by a dedicated hardware matrix. It translates voltage functions and relay timing pulses per cavity group into functions and timings per cavity. However, due to its central position in the RF beam control system, the dedicated hardware matrix can cause significant downtime in case of a major hardware failure. Instead of upgrading the existing obsolete hardware, this note suggests a replacement by standard controls hardware and dedicated application software. Thanks to advanced software concepts like “M...

  12. CERN的ISOLDE装置上的ECR离子剥离器Phoenix的最新进展%Recent Developments on the Phoenix ECR Booster at ISOLDE,CERN

    Institute of Scientific and Technical Information of China (English)

    M.Marie-Jeanne; P.Delahaye

    2007-01-01

    At ISOLDE(CERN),an on-line test bench is dedicated to charge breeding experiments with a 14GHz Phoenix ion source,for the investigation of the 1+→ n+ scenario at next generation ISOL-type facilities.This year,various technical developments have been undertaken for intensifying the tests of the online performances of the booster with a high diversity of stable and radioactive ion beams.This contribution will present an overview of the latest developments,the current challenges,and some perspectives for the future use of the Phoenix booster for physics experiments at ISOLDE.

  13. MERIT - The high intensity liquid mercury target experiment at the CERN PS

    CERN Document Server

    Efthymiopoulos, I

    2009-01-01

    The MERIT experiment is a proof-of-principle test of a target system for high power proton beams to be used as front-end for a Neutrino Factory complex or a Muon Collider. The experiment took data in autumn 2007 with the fast extracted beam from the CERN Proton Synchrotron (PS) to a maximum intensity of about 30 × 1012 protons per pulse. The target system, based on a free mercury jet, allowed investigation of the interseption of a 4-MW proton beam inside a 15-T magnetic field required to capture the low-energy secondary pions as the source of the required intense muon beams. Particle detectors have been installed around the target setup to measure the secondary particle flux out of the target and probe cavitation effects in the mercury jet when exited with a beam of variable intensity. With the analysis of the data ongoing, results will be presented here that demonstrate the validity of the liquid target concept.

  14. Septum magnet MNP-23 for the CERN PS experimental area and its fast interlock system

    CERN Document Server

    Borburgh, J; Prost, A; Zickler, T

    2004-01-01

    Two MNP-23 septum-like magnets are installed at CERN in the transfer line from the Proton Synchrotron (PS) to the East Hall Experimental Area. They are exposed to extremely high doses of ionizing radiation. In the past, the magnets experienced two catastrophic failures due to overheating of its coils and cannot be repaired. The magnets of improved design which is subject of this article are built as replacements for the magnets presently installed. The MNP-23 is a resistive C shaped iron-dominated magnet made of solid low carbon steel blocks. The excitation windings consist of two water-cooled coils wound from hollow copper conductor. The septum design of these magnets implies a high current density which requires an efficient water cooling system. The newly designed cooling circuit provides better cooling performance and more reliability. To avoid failures due to coil overheating, an elaborate interlock system was developed and installed. It consists of two parts: firstly a slow, more classic sensor, to dete...

  15. Design of Injection and Extraction Systems with Optimisation of Lattice and Layout for the CERN PS2 Synchrotron

    CERN Document Server

    Bartmann, W

    2009-01-01

    The CERN Proton Synchrotron PS2 is one of the foreseen accelerators for the LHC injector upgrade. This upgrade aims first at increasing the instantaneous luminosity of LHC and second at providing a reliable beam for the CERN accelerator complex. From this aspect, the main characteristics of the PS2 are high reliability for high intensity beams. The goal of this thesis was the design of the machine’s lattice and injection/extraction systems meeting the constraints coming mainly from the LHC beam type but also from beam requirements of experiments at PS2 and the SPS. In the design, the given energy range together with filling schemes for different beam types and RF cogging were first used to define the circumference of the machine. Estimates on the space requirements of injection/extraction systems were made in order to divide the total machine length between arc and long straight section. Existing tunnels for transfer lines together with the minimisation of the total transfer line length favoured a race trac...

  16. The Booster

    CERN Multimedia

    1972-01-01

    Where the beams from the Booster's four rings begin to recombine, before transfer to the PS. On the left are dipoles for vertical steering, and on the right is the tank containing two septum magnets which form the first combining element.

  17. Beam Tests and Plans for the CERN PS Transverse Damper System

    CERN Document Server

    Blas, A; Sterbini, G

    2013-01-01

    The CERN Proton Synchrotron (CPS) has been running without any transverse damping equipment since 1998, thanks to the stabilizing effect of the linear coupling applied between horizontal and vertical planes. \

  18. LS1 Report: first beams in the Booster

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Monday, 2 June, the Operations Group injected the first beams into the PS Booster (PSB). The PSB, the second machine in the LHC injector chain to be recommissioned (Linac2 was the first), also provides beams for non-LHC experiments, some of which will need beams for physics as early as this summer.   The PS Booster. The Operations Group has been back in control of the PS Booster for a month now, having taken over where the engineers and experts of the EN Department, who were responsible for the maintenance work, left off. The group first ran tests with no beam (known as “cold check-out”) to check and requalify all the machine instrumentation, from the control room to the ring itself. Now in beam mode, the Booster is being prepared both to begin supplying the PS at the end of June and, above all, for physics to restart in the ISOLDE experimental area. The PS Booster console in the CERN Control Centre. “We have around 15 types of beams to ‘prepa...

  19. Status of the anti-proton production beam in the CERN PS

    International Nuclear Information System (INIS)

    A new scheme was put into operation in November 1988 to upgrade the proton beam delivered by the 26 GeV Proton Synchrotron (PS) for anti-proton production. It makes use of quasi-adiabatic manipulations of the RF parameters to squeeze a beam filling 1/2 of the PS circumference into a 1/4 turn and can in theory preserve the longitudinal emittance. A maximum intensity of 1.68 e13 ppp in 5 bunches at 26 GeV has been reached in the course of 22 weeks of operation. The limitations of the performance are analysed together with possible improvements. (author) 6 refs., 9 figs

  20. The CERN ps as e+e- accelerator in the LEP injector chain: First results

    International Nuclear Information System (INIS)

    The role of the 28 GeV Proton Synchrotron (PS) in the LEP injector chain (1) is to accelerate up to 3.5 GeV and transfer to the SPS e+ and e- delivered by the Electron Positron Accumulator (EPA) at 600 MeV. First injection in the PS of e- at 500 MeV and acceleration was achieved, as scheduled, in September 1986. As required by future operation, these first tests were carried out while delivering beams of different particles to the other PS users. Two different modes of acceleration and bunch shaping needed for stability at injection in SPS have been successfully tried up to twice the nominal intensity: 1) with two new high Q 114 MHz cavities (2) (''Bunch Expansion''), 2) with the existing ferrite cavities tuned at 3.8 MHz and one new high Q 114 MHz cavity (''Long Bunch Expansion''). As a consequence of the combined function magnets in the PS, the longitudinal and horizontal damping partition numbers are Je = 4 and Jx =-1 respectively, therefore electron acceleration is horizontally unstable. Because of this, in all three modes the damping partition numbers, and thus longitudinal and horizontal beam emittance, were controlled by Robinson wigglers. Synchrotron radiation effects were also studied during a dedicated run. This paper describes the problems encountered and the performance achieved so far

  1. The Proton Beams for the New Time-of-Flight Neutron Facility at the CERN-PS

    CERN Document Server

    Cappi, R; Métral, G

    2000-01-01

    The experimental determination of neutron cross sections in fission and capture reactions as a function of the neutron energy is of primary importance in nuclear physics. Recent developments at CERN and elsewhere have shown that many fields of research and development, such as the design of Accelerator-Driven Systems (ADS) for nuclear waste incineration, nuclear astrophysics, fundamental nuclear physics, dosimetry for radiological protection and therapy, would benefit from a better knowledge of neutron cross sections. A neutron facility at the CERN-PS has been proposed with the aim of carrying out a systematic and high resolution study of neutron cross sections through Time-Of-Flight (n-TOF) measurement. The facility requires a high intensity proton beam (about 0.7x1013 particles/bunch) distributed in a short bunch (about 25 ns total length) to produce the neutrons by means of a spallation process in a lead target. To achieve these characteristics, a number of complex beam gymnastics have to be performed. All...

  2. Multi-turn Extraction system of the PS at CERN: information management and planning

    OpenAIRE

    Vergara Fernández, Rocío

    2007-01-01

    CERN es el Consejo Europeo de la Investigación Nuclear. Es el mayor laboratorio de física de partículas, donde científicos de todo el mundo estudian la estructura de la materia y las fuerzas que las mantienen unidas para así conseguir entender mejor el comportamiento y el origen del Universo. Actualmente se está construyendo el mayor acelerador del mundo (ya en su fase de puesta en marcha), el Large Hadron Collider (LHC) situado en la frontera franco-suiza, ocupando un túnel 27...

  3. Accelerating and separating mixed beams of ions with similar charge to mass ratio in the CERN ps complex

    International Nuclear Information System (INIS)

    This paper reports that sulphur 32 ions were accelerated by the CERN machines to a world record energy of 6.4 TeV. An Electron Cyclotron Resonance source produces sulphur ions as a 5 per cent contamination of an oxygen ion beam. As their charge-to-mass ratios differ by only 5.4 E-4, the two species are not distinguishable by the downstream accelerators (RFQ, Linac 1, PSB), though measurable in a specially equipped spectrometer line. In this way, enough current is available for controlled acceleration at low beta in the PSB. However, at phase transition energy in the PS - about 6 GeV/nucleon (GeV/u) - this synchrotron becomes an extremely fine spectrometer, with sulphur 16+ ions being driven inwards, and oxygen 8+ outwards. This can be used for separating the beams by manipulating the low-level radio-frequency system at transition, so that either oxygen or sulphur is selected. Indeed, the SPS could be fed with a fairly intense oxygen beam for setting-up, and later with some 2E7 sulphur ions per PS cycle. The required RF manipulations, the present understanding on beam dynamics at transition, as well as diagnostic techniques for determining the amount of sulphur are presented

  4. Measurement of the mean radial position of a lead ion beam in the CERN PS

    CERN Document Server

    Belleman, J; González, J; Johnston, S; Schulte, E C; Thivent, E

    1996-01-01

    The intensity of the lead ion beam in the PS, nominally 4×108 charges of Pb53+ per bunch, is too low for the closed orbit measurement system. However, for successful acceleration it is sufficient to know the mean radial position (MRP). A system was thus designed for simultaneous acquisition of revolution frequency and magnetic field. The frequency measurement uses a direct digital synthesiser (DDS), phase-locked to the beam signal from a special high-sensitivity pick-up. The magnetic field is obtained from the so-called B-train. From these two values, the MRP is calculated. The precision depends on the frequency measurement and on the accuracy of the value for the magnetic field. Furthermore, exact knowledge of the transition energy is essential. This paper describes the hardware and software developed for the MRP system, and discusses the issue of calibration, with a proton beam, of the B measurement.

  5. Replacing the Beam Dump at the Booster

    CERN Multimedia

    2013-01-01

    The PS Booster Dump, designed in the 1960’s to cope with beam energies in the order of 800 MeV, has been dismantled and replaced with a new one, capable of withstanding the 2 GeV beam provided by the upcoming LINAC4 at CERN. This video shows the installation of that new dump core inside a one-metre diameter cavity, surrounded by five shielding rings made of concrete and steel. It is the culmination of months of preparation, an interdisciplinary work involving several teams from the Engineering, Beams and Technology Departments, as well as the collaboration and supervision of radio-protection experts.

  6. Electron-cloud simulation studies for the CERN-PS in the framework of the LHC Injectors Upgrade project

    CERN Document Server

    Rioja Fuentelsaz, Sergio

    The present study aims to provide a consistent picture of the electron cloud effect in the CERN Proton Synchrotron (PS) and to investigate possible future limitations due to the requirements foreseen by the LHC Injectors Upgrade (LIU) project. It consists of a complete simulation survey of the electron cloud build-up in the different beam pipe sections of the ring depending on several controllable beam parameters and vacuum chamber surface properties, covering present and future operation parameters. As the combined function magnets of the accelerator constitute almost the $80\\%$ in length of the ring, the implementation of a new feature for the simulation of any external magnetic field on the PyECLOUD code, made it possible to perform this study. All the results of the simulations are given as a function of the vacuum chamber surface properties in order to deduce them, both locally and globally, when compared with experimental data. In a first step, we characterize locally the maximum possible number of ...

  7. New safety training for access to the PS complex areas

    CERN Multimedia

    2012-01-01

    Since 10/08/2012, a new course dedicated to the specific radiological risks in the accelerators of the PS complex has been available on SIR (https://sir.cern.ch/). This course complements the general classroom-based Radiation Safety training. Successful completion of the course will be obligatory and verified by the access system as from 01/11/2012 for access to the following accelerator areas: LINAC2, BOOSTER, PS and TT2. Information and reminder e-mails will be sent to all persons currently authorized to access the accelerators of the PS complex. For questions please contact the HSE unit and in particular, the Radiation Protection Group (+41227672504 or safety-rp-ps-complex@cern.ch).

  8. Cern

    CERN Multimedia

    2009-01-01

    "La réparation de l'accélérateur géant de particules LHC, qui devrait redémarrer mi-novembre aprés une panne de plus d'un an, a coûté 23 millions d'euros, selon un haut responsable du Centre européen de recherche nucléaire (CERN), cité vendredi par les médias espagnols" (1 paragraph)

  9. CERN Central Library : 2000 year old technology transfer. Two fragments of columns from a Roman building discovered during excavations for the PS in 1956 have prominent places in the Library where they can be enjoyed by all

    CERN Multimedia

    Laurent Guiraud

    2001-01-01

    CERN Central Library : 2000 year old technology transfer. Two fragments of columns from a Roman building discovered during excavations for the PS in 1956 have prominent places in the Library where they can be enjoyed by all

  10. Mapping of the thermal neutron distribution in the lead block assembly of the PS-211 experiment at CERN, using thermoluminescence and nuclear track detectors

    CERN Document Server

    Savvidis, E; Kitis, G

    2002-01-01

    The main purpose of the TARC (transmutation by adiabatic resonance crossing) experiment (PS-211), was to demonstrate the possibility to destroy efficiently long-lived fission fragments (LLFF) in accelerator driven systems (ADS). The experimental set-up which consisted of a lead block with dimensions 3.3 * 3.3 * 3 m/sup 3/, was installed in a CERN proton synchrotron (PS) beam line. The proton beam at 2.5 GeV/c and 3.5 GeV/c, was incident in the centre of the lead block assembly producing neutrons via spallation reactions. Neutron flux measurements are presented in the lead block assembly using thermoluminescence and nuclear track detectors. The results are in good agreement with Monte Carlo calculations as well as with the results of the other methods used in the framework of the TARC experiment. (5 refs).

  11. Study of relativistic nucleus reactions induced by /sup 16/O beams of 9-13 GeV per nucleon at the CERN PS

    CERN Document Server

    Angert, N; Bock, R; Gutbrod, H H; Harris, H; Maier, M R; Poskanzer, A M; Pugh, H G; Pühlhofer, F; Renford, R E; Ritter, H G; Sandoval, A; Schröder, L S; Skrzypczak, E; Stock, R; Ströbele, H; Szwed, R; Warwick, A; Weik, F; Wiemann, H; Wolf, K L

    1982-01-01

    Proposes to study the target fragmentation modes and\\pi/sup +or-/, K ^{0}, Lambda , p and Lambda production in collisions of /sup 16/O with target nuclei ranging from /sup 40/Ca to /sup 206/Pb. The acceleration of /sup 16/O in the PS will be facilitated by a high charge state ion source installed at the Linac I. Experimental equipment will be the Plastic Ball spectrometer, currently employed at the Bevalac, LBL Berkeley, and the streamer chamber of the MPI-Munchen group, presently used at the SPS inside a CERN Vertex magnet. The experiments require the acceleration of 10/sup 7/ oxygen ions per PS cycle and two splits in the East Hall external beam system delivering about 10/sup 5/ ions/s to the streamer chamber and the main part of the intensity to the Plastic Ball.

  12. Determination of the Neutron Fluence, the Beam Characteristics and the Backgrounds at the CERN-PS TOF Facility

    CERN Multimedia

    Leal, L C; Kitis, G; Guber, K H; Quaranta, A; Koehler, P E

    2002-01-01

    In the scope of our programme we propose to start in July 2000 with measurements on elements of well known cross sections, in order to check the reliability of the whole experimental installation at the CERN-TOF facility. These initial exploratory measurements will provide the key-parameters required for the further experimentation at the CERN-TOF neutron beam. The neutron fluence and energy resolution will be determined as a function of the neutron kinetic energy by reproducing standard capture and fission cross sections. The measurements of capture cross sections on elements with specific cross section features will allow to us to disentangle the different components of backgrounds and estimate their level in the experimental area. The time-energy calibration will be determined and monitored with a set of monoenergetic filters as well as by the measurements of elements with resonance-dominated cross sections. Finally, in this initial phase the behaviour of several detectors scheduled in successive measureme...

  13. Fifty years of the CERN Proton Synchrotron Volume 2

    CERN Document Server

    CERN. Geneva; Manglunki, Django; Burnet, Jean-Paul; Carli, Christian; Chanel, Michel; Garoby, Roland; Giovannozzi, Massimo; Hancock, Steven; Haseroth, Helmut; Hübner, Kurt; Küchler, Detlef; Lewis, Julian; Lombardi, Alessandra; Martini, Michel; Maury, Stephan; Métral, Elias; Möhl, Dieter; Plass, Günther; Rinolfi, Louis; Scrivens, Richard; Steerenberg, Rende; Steinbach, Charles; Vretenar, Maurizio; Zickler, Thomas

    2013-01-01

    This report sums up in two volumes the first 50 years of operation of the CERN Proton Synchrotron. After an introduction on the genesis of the machine, and a description of its magnet and powering systems, the first volume focuses on some of the many innovations in accelerator physics and instrumentation that it has pioneered, such as transition crossing, RF gymnastics, extractions, phase space tomography, or transverse emittance measurement by wire scanners. The second volume describes the other machines in the PS complex: the proton linear accelerators, the PS Booster, the LEP pre-injector, the heavy-ion linac and accumulator, and the antiproton rings.

  14. Fifty years of the CERN Proton Synchrotron Volume 1

    CERN Document Server

    CERN. Geneva; Carli, Christian; Chanel, Michel; Garoby, Roland; Gilardoni, Simone; Giovannozzi, Massimo; Hancock, Steven; Haseroth, Helmut; Hübner, Kurt; Küchler, Detlef; Lewis, Julian; Lombardi, Alessandra; Manglunki, Django; Martini, Michel; Maury, Stephan; Métral, Elias; Möhl, Dieter; Plass, Günther; Rinolfi, Louis; Scrivens, Richard; Steerenberg, Rende; Steinbach, Charles; Vretenar, Maurizio; Zickler,Thomas

    2011-01-01

    This report sums up in two volumes the first 50 years of operation of the CERN Proton Synchrotron. After an introduction on the genesis of the machine, and a description of its magnet and powering systems, the first volume focuses on some of the many innovations in accelerator physics and instrumentation that it has pioneered, such as transition crossing, RF gymnastics, extractions, phase space tomography, or transverse emittance measurement by wire scanners. The second volume describes the other machines in the PS complex: the proton linear accelerators, the PS Booster, the LEP pre-injector, the heavy-ion linac and accumulator, and the antiproton rings.

  15. A High-power Superconducting H$^-$ Linac (SPL) at CERN

    CERN Document Server

    Chiaveri, Enrico

    2001-01-01

    The conceptual design of a superconducting H^- linear accelerator at CERN for a beam energy of 2.2 GeV and a power of 4 MW is presented. Using most of the superconducting RF cavities available after the decommissioning of LEP, it operates at 352 MHz and delivers 10^16 protons per second. At an early stage it will upgrade the performance of the PS complex by replacing Linac2 and the PS booster, by injecting protons directly into the PS. The brilliance of the LHC beam will thus be tripled. The present ISOLDE facility can be supplied with five times more beam current than to-day. In conjunction with an accumulator and a compressor, the purpose of its design is to be the proton driver of a neutrino factory at CERN.

  16. Intensity effects in the formation of stable islands in phase space during the multi-turn extraction process at the CERN PS

    CERN Document Server

    machida, Shinji; Prior, Chris; Gilardoni, Simone; Giovannozzi, Massimo; Hirlander, Simon; Huschauer, Alexander

    2016-01-01

    The CERN PS utilises a Multi-Turn Extraction (MTE) scheme to stretch the beam pulse length to optimise the filling process of the SPS. MTE is a novel technique to split a beam in transverse phase space into nonlinear stable islands. The recent experimental results indicate that the positions of the islands depend on the total beam intensity. Particle simulations have been performed to understand the detailed mechanism of the intensity dependence. The analysis carried out so far suggests space charge effects through image charges and image currents on the vacuum chamber and the magnets iron cores dominate the observed behaviour. In this talk, the latest analysis with realistic modelling of the beam environment is discussed and it is shown how this further improves the understanding of intensity effects in MTE.

  17. Excitation of Longitudinal Coupled-bunch Oscillations with the Wide-band Cavity in the CERN PS

    CERN Document Server

    Ventura, Letizia; Migliorati, Mauro; Sterbini, Guido

    2016-01-01

    Longitudinal coupled-bunch oscillations in the CERN Proton Synchrotron have been studied in the past years and they have been recognized as one of the major challenges to reach the high brightness beam required by the High Luminosity LHC project. In the frame of the LHC Injectors Upgrade project in 2014 a new wide-band Finemet cavity has been installed in the Proton Synchrotron as a part of the coupled-bunch feedback system. To explore the functionality of the Finemet cavity during 2015 a dedicated measurement campaign has been performed. Coupled-bunch oscillations have been excited with the cavity around each harmonic of the revolution frequency with both a uniform and nominal filling pattern. In the following the measurements procedure and results are presented.

  18. CERN-PS Main Power Converter Renovation How to Provide and Control the Large Flow of Energy for a Rapid Cyclic Machine?

    CERN Document Server

    Bordry, Frederick; Völker, F V

    2005-01-01

    The PS accelerator (Proton-Synchrotron) at CERN, which is part of the LHC injector chain, is composed of one hundred magnets connected in series. During a typical acceleration cycle (taking 2.4 seconds), the active power at the magnet terminals varies from plus to minus 40 MW. As this large active power variation was not acceptable to the electrical network, a motor-generator set (M-G) was inserted between the grid and the load. The M-G set (of 1968) acts as a fly-wheel with a stored kinetic energy of 233 MJ and the magnets are fed via two 12-pulse thyristor rectifiers. A renovation or replacement of the installation is planned in the near future as part of the consolidation of the LHC injectors to avoid any major breakdown, to improve overall availability and to reduce operation and maintenance costs. This paper presents a first comparison of technical solutions available to build such a power system and the strategy that will be applied for the up-grade of the system.

  19. Design Study of the Large Hadron Electron Collider and a Rapid Cycling Synchrotron as Alternative to the PS Booster Upgrade at CERN

    OpenAIRE

    Fitterer, Miriam

    2013-01-01

    To further extend the discovery potential of the Large Hadron Collider (LHC), a major upgrade is foreseen around 2020 of the LHC itself and the LHC injectors. Furthermore it has been suggested to built a new electron accelerator in order to allow for deep inelastic lepton-nucleon scattering at the LHC, referred to as Large Hadron Electron Collider (LHeC). In this thesis design options for a new LHC injector - a Rapid Cycling Synchrotron - and an electron accelerator for the LHeC are presented.

  20. CERN Heavy-Ion Facility design report

    International Nuclear Information System (INIS)

    The design of the CERN Heavy-Ion Facility is described. This facility will be based on a new ion linear accelerator (Linac 3), together with improvements to the other accelerators of the CERN complex to allow them to cope with heavy ions, i.e. to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and the Super Proton Synchrotron (SPS). For this reference design, the pure isotope of lead, 208Pb, is considered. The bulk of the report describes Linac 3, a purpose-built heavy-ion linac mainly designed and constructed in collaboration with several CERN member state laboratories, but also with contributions from non-member states. Modifications and improvements to existing CERN accelerators essentially concern the RF acceleration, beam control and beam monitoring (all machines), beam kickers and septa at the input and output of the PSB, and major vacuum improvements, aiming to reduce the pressure by factors of at least seven and three in the PSB and PS respectively. After injection from the Electron Cyclotron Resonance source at 2.5 keV/u the partially stripped heavy-ion beam is accelerated successively by a Radio Frequency Quadrupole and an Interdigital-H linac to 4.2 MeV/u. After stripping to 208Pb53+, the beam is again accelerated, firstly in the PSB (to 98.5 MeV/u), then in the PS (to 4.25 GeV/u). The final stage of acceleration in the SPS takes the fully stripped 208Pb82+ ions to 177 GeV/u, delivering a beam of 4.108 ions per SPS supercycle (15.2 s) to the experiments. The first physics run with lead ions is scheduled for the end of 1994. Finally, some requirements for carrying out heavy-ion physics at the Large Hadron Collider are mentioned. (orig.)

  1. CERN OVERVIEW animation

    CERN Multimedia

    Arzur Catel Torres

    2015-01-01

    This animation shows how the Large Hadron Collider (LHC) works. The film begins with an aerial view of CERN near Geneva, with outlines of the accelerator complex, including the underground Large Hadron Collider (LHC), 27-km in circumference. The positions of the four largest LHC experiments, ALICE, ATLAS, CMS and LHCb are revealed before we see protons travelling around the LHC ring. The proton source is a simple bottle of hydrogen gas. An electric field is used to strip hydrogen atoms of their electrons to yield protons. Linac 2, the first accelerator in the chain, accelerates the protons to the energy of 50 MeV. The beam is then injected into the Proton Synchrotron Booster (PSB), which accelerates the protons to 1.4 GeV, followed by the Proton Synchrotron (PS), which pushes the beam to 25 GeV. Protons are then sent to the Super Proton Synchrotron (SPS) where they are accelerated to 450 GeV. The protons are finally transferred to the two beam pipes of the LHC. The beam in one pipe circulates clockwise while ...

  2. Development of Upgraded Magnetic Instrumentation for CERN Real-Time Reference Field Measurement Systems

    CERN Document Server

    Buzio, M; Galbraith, P; Golluccio, G; Giloteaux, D; Gilardoni, S; Petrone, C; Walckiers, L

    2010-01-01

    The control of five of the accelerators in the CERN injector chain (PS, PS Booster, SPS, LEIR and AD) is based upon real-time measurements in a reference magnet. These so-called “B-train” systems include a field marker to signal the achievement of a given field value, complemented by one or more pick-up coils to integrate flux changes. Recently, some concerns were raised about long-term reliability and performance improvements, in terms of both resolution and operational flexibility, for these systems. This paper reports the status of three related R&D activities, namely: the development of a novel dynamic NMR field marker for the PS; a campaign aimed at the detailed measurement of the magnetic state of a PS main magnet; and the design of a standardized electronic signal acquisition and conditioning system.

  3. A great start for the whole CERN accelerator chain

    CERN Multimedia

    2016-01-01

    With physics data-taking under way this week at the LHC, I’d like to take a look at what’s been happening at the rest of the CERN accelerator chain.   The LHC tends to dominate the news from CERN for all kinds of reasons, beech martens included, but we should not forget that there is a unique chain of accelerators upstream of the LHC, tended to and operated by an incredible group of people. If our whole accelerator chain does not work perfectly, nor can the LHC, and in addition to forming the LHC’s injector chain, our upstream accelerators support their own experiments, bringing great diversity to the CERN research programme. The chain begins with the proton source and Linac2, which have been faithfully delivering beams since 1978. This year, Linac2 accelerated its first beams on 29 February. Beams were then passed on to the PS Booster and the veteran PS, the linchpin of the CERN accelerator complex and in operation since 1959. The final link in the chain before the ...

  4. CERN : Nouveaux records lors d'une période d'exploitation au PS/SPS ; Un nouveau rôle pour les ISR ; Deuxième région d'intersection pour le système pp du SPS ; Détermination de la durée de vie du charme ; Calcul en Sicile et au CERN

    CERN Multimedia

    1979-01-01

    CERN : Nouveaux records lors d'une période d'exploitation au PS/SPS ; Un nouveau rôle pour les ISR ; Deuxième région d'intersection pour le système pp du SPS ; Détermination de la durée de vie du charme ; Calcul en Sicile et au CERN

  5. Measurement targets of the PS Booster

    CERN Document Server

    1976-01-01

    On the left is a vacuum pumping station, followed by a stack of multipole lenses. In the centre of the picture, i.e. in the middle of the long straight section, is a stack of measurement targets. Each of the four sets has a horizontal and a vertical plunging fork. The size of the beam is measured by destroying all particles with an amplitude exceeding the size of the fork. See 7112180 for details.

  6. Immunity booster

    International Nuclear Information System (INIS)

    The immunity booster is, according to its patent description, microbiologically pure water with an D/(D+H) isotopic concentration of 100 ppm, with physical-chemical characteristics similar to those of distilled water. It is obtained by sterilization of a mixture of deuterium depleted water, with a 25 ppm isotopic concentration, with distilled water in a volume ratio of 4:6. Unlike natural immunity boosters (bacterial agents as Bacillus Chalmette-Guerin, Corynebacterium parvum; lipopolysaccharides; human immunoglobulin) or synthetical products (levamysol; isoprinosyne with immunostimulating action), which cause hypersensitivity and shocks, thrill, fever, sickness and the immunity complex disease, the water of 100 ppm D/(D + H) isotopic concentration is a toxicity free product. The testing for immune reaction of the immunity booster led to the following results: - an increase of cell action capacity in the first immunity shielding stage (macrophages), as evidenced by stimulation of a number of essential characterizing parameters, as well as of the phagocytosis capacity, bactericide capacity, and opsonic capacity of serum; - an increase of the number of leucocyte particularly of the granulocyte in peripheral blood, produced especially when medullar toxic agents like caryolysine are used; - it hinders the effect of lowering the number of erythrocytes in peripheral blood produced by experimentally induced chronic inflammation; - an increase of nonspecific immunity defence capacity against specific bacterial aggression of both Gram-positive bacteria (Streptococcus pneumoniae558) and of the Gram-negative ones (Klebsiella pneumoniae 507); - an increase of immunity - stimulating activity (proinflamatory), like that of levamisole as evidenced by the test of stimulation of experimentally induced inflammation by means of carrageenan. The following advantages of the immunity booster are stressed: - it is toxicity free and side effect free; - can be orally administrated as food

  7. Sharing resources@CERN

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    The library is launching a 'sharing resources@CERN' campaign, aiming to increase the library's utility by including the thousands of books bought by individual groups at CERN. This will improve sharing of information among CERN staff and users. Photo 01: L. to r. Eduardo Aldaz, from the PS division, Corrado Pettenati, Head Librarian, and Isabel Bejar, from the ST division, read their divisional copies of the same book.

  8. PS injection area

    CERN Multimedia

    1974-01-01

    Looking against the direction of protons in the main ring (left): the beam coming from the linac 1 either goes to the booster (on the right) or is deflected towards the PS to be directly injected into section 26 (facing the camera). Also shown the start of the TT2 line, ejected from straight section 16 to go towards the ISR passing over the beam line from the linac. (see Photo Archive 7409009)

  9. CERN Linac4. The space charge challenge

    Energy Technology Data Exchange (ETDEWEB)

    Hein, Lutz Matthias

    2013-08-06

    In the first phase of the upgrade program of the CERN accelerator complex the proton injector Linac2 will be replaced by a new, normal-conducting H-ion Linac, Linac4, allowing a significant increase of the proton flux intensity along the downstream accelerator complex. In the design of Linac4 three beam transport sections are implemented to match the beam between the different accelerator elements and to model the longitudinal pulse structure. These three beam transport sections, which are the most critical locations in terms of beam quality preservation, are in the focus of this thesis. During the work of this thesis the Low Energy Beam Transport (LEBT), which is required to match the source beam to the radiofrequency quadrupole (RFQ), has been commissioned and its beam dynamics re-constructed. The measurement campaign used to reconstruct the LEBT beam dynamics was performed with the aim to prepare the RFQ commissioning and to maximise the LEBT performance. Downstream of the Linac4 accelerator the beam is transported along a 180 m long transfer line to the Proton Synchrotron Booster (PS-Booster). The transfer line optics was studied, optimised and sections were completely re-designed. The new transfer line optics is characterised by an improved preservation of the beam emittance, higher stability of the optical solution with respect to alignment errors and field jitters of the transfer line magnets and it is matched to each of the PS-Booster injection schemes. In a concluding ''Start-To-End'' simulation based on the measured beam characteristics at the LEBT exit the beam dynamics of the downstream Linac, including the transfer line, was calculated. To minimise particle losses within acceptable emittance preservation the beam optics of the Medium Energy Beam Transport (MEBT) was adapted to the measured beam parameters. This ''Start-To-End'' simulation was performed to identify critical sections of the Linac4 beam dynamics and

  10. CERN Linac4. The space charge challenge

    International Nuclear Information System (INIS)

    In the first phase of the upgrade program of the CERN accelerator complex the proton injector Linac2 will be replaced by a new, normal-conducting H-ion Linac, Linac4, allowing a significant increase of the proton flux intensity along the downstream accelerator complex. In the design of Linac4 three beam transport sections are implemented to match the beam between the different accelerator elements and to model the longitudinal pulse structure. These three beam transport sections, which are the most critical locations in terms of beam quality preservation, are in the focus of this thesis. During the work of this thesis the Low Energy Beam Transport (LEBT), which is required to match the source beam to the radiofrequency quadrupole (RFQ), has been commissioned and its beam dynamics re-constructed. The measurement campaign used to reconstruct the LEBT beam dynamics was performed with the aim to prepare the RFQ commissioning and to maximise the LEBT performance. Downstream of the Linac4 accelerator the beam is transported along a 180 m long transfer line to the Proton Synchrotron Booster (PS-Booster). The transfer line optics was studied, optimised and sections were completely re-designed. The new transfer line optics is characterised by an improved preservation of the beam emittance, higher stability of the optical solution with respect to alignment errors and field jitters of the transfer line magnets and it is matched to each of the PS-Booster injection schemes. In a concluding ''Start-To-End'' simulation based on the measured beam characteristics at the LEBT exit the beam dynamics of the downstream Linac, including the transfer line, was calculated. To minimise particle losses within acceptable emittance preservation the beam optics of the Medium Energy Beam Transport (MEBT) was adapted to the measured beam parameters. This ''Start-To-End'' simulation was performed to identify critical sections of the Linac4 beam dynamics and to adjust the commissioning strategies.

  11. SUPERCOLLIDER: Boosters

    International Nuclear Information System (INIS)

    Full text: The conventional construction contract for the Low Energy Booster (LEB) at the Superconducting Supercollider (SSC) being built in Ellis County, Texas, was awarded in December to Cajun Contractors of Dallas, Texas. The construction includes 1870 feet of cut-and-cover tunnel with a shielding berm, an equipment access corridor, and provision for emergency exits. It also includes ten surface buildings, as well as the usual infrastructure (concrete pads, roads, and utilities). In addition, 575 feet of cut and- cover tunnel for the next machine in the chain, the medium Energy Booster (MEB), is included. Beneficial occupancy of all structures is projected for mid-April next year. The ring magnets for the LEB include 96 conventional (non-superconducting) dipoles, each 2 metres long, and a total of 90 quadrupoles of the same cross-section as the dipoles but in eight different lengths between 0.55 and 0.71 meters. Prototypes of the dipoles and quadrupoles are being constructed by Stanford (SLAC) and Lawrence Berkeley Laboratory respectively. Production magnets are expected to be fabricated in collaboration with the Budker Institute for Nuclear Physics (BINP), Novosibirsk, starting this summer. BINP is also collaborating on the design and the fabrication of 12 dipole and 20 quadrupole magnets for the beam transfer and abort lines from the LEB to the Medium Energy Booster (MEB). The ring magnets for the MEB include 364 conventional dipoles (340 6.45 metres long and 24 5.75 metres long) and 230 quadrupoles (206 2.40 metres long and 12 each 2.8 and 0.54 metres long). A full-size development model of the dipole magnets is under construction at Fermilab. The Moscow Radiotechnical Institute is being considered as a collaborative source for the production of the quadrupole magnets, with production to start in summer of 1994 after approval of prototypes. The increasing Russian involvement in the SSC project was formalized in January when US Department of Energy Secretary

  12. Proposal to study $\\overline{p}$-nucleon interactions in the Cern 2m Hydrogen and deuterium BC, with $\\overline{p}$ at the highest energies alowed by the RF separators (10-15 GeV with the present PS intensity) by the Padua and Pisa TC Groups.

    CERN Document Server

    CERN. Geneva. Track Chamber Committee

    1966-01-01

    Proposal to study $\\overline{p}$-nucleon interactions in the Cern 2m Hydrogen and deuterium BC, with $\\overline{p}$ at the highest energies alowed by the RF separators (10-15 GeV with the present PS intensity) by the Padua and Pisa TC Groups.

  13. $\\pi^{-}p \\to (K\\overline{K})^{\\pm}\\pi^{\\mp}\\eta$ bei 16 GeV/c, ein Experiment mit dem Omega-Spektrometer am CERN-PS und Bestimmung von Spin und Parität des D(1285)-Mesons im neutralen $(K\\overline{K}\\pi)$-System

    CERN Document Server

    Aebischer, Bernard; Otter, Gerd

    1979-01-01

    $\\pi^{-}p \\to (K\\overline{K})^{\\pm}\\pi^{\\mp}\\eta$ bei 16 GeV/c, ein Experiment mit dem Omega-Spektrometer am CERN-PS und Bestimmung von Spin und Parität des D(1285)-Mesons im neutralen $(K\\overline{K}\\pi)$-System

  14. CMS Centre at CERN

    CERN Multimedia

    2007-01-01

    A new "CMS Centre" is being established on the CERN Meyrin site by the CMS collaboration. It will be a focal point for communications, where physicists will work together on data quality monitoring, detector calibration, offline analysis of physics events, and CMS computing operations. Construction of the CMS Centre begins in the historic Proton Synchrotron (PS) control room. The historic Proton Synchrotron (PS) control room, Opened by Niels Bohr in 1960, will be reused by CMS to built its control centre. TThe LHC@FNAL Centre, in operation at Fermilab in the US, will work very closely with the CMS Centre, as well as the CERN Control Centre. (Photo Fermilab)The historic Proton Synchrotron (PS) control room is about to start a new life. Opened by Niels Bohr in 1960, the room will be reused by CMS to built its control centre. When finished, it will resemble the CERN Contro...

  15. An on-line evaluation of the relative mean radial position of the CERN PS beam using a high-precision chronometer

    International Nuclear Information System (INIS)

    A method of evaluating on-line the relative Mean Radial Position (MRP) of the beam in the CERN Proton Synchrotron based on the radio-frequency acceleration of the beam is discussed. A high-precision chronometer capable of measuring the time for a set number of periods of oscillation of the acceleration radio frequency with an accuracy of -+0.5 nsecs is used. This high accuracy means that the evaluation may be carried out without recourse to the computation of the first differentials with respect to time of frequency or flux density and with an accuracy better than 0.2 mm. This method of MRP measured is much simpler than previous procedures and permits a continuous measurement every cycle or supercycle depending on the synchronization used. (U.K.)

  16. Accelerating RF cavity of the Booster

    CERN Multimedia

    CERN PhotoLab

    1981-01-01

    Each of the 4 PS Booster rings has a single accelerating cavity. It consists of 2 quarter-wave ferrite-loaded resonators. There are 2 figure-of-eight loops on the ferrite loads for tuning the frequency throughout the acceleration cycle, from 3 to 8 MHz (from 50 MeV at injection to the original Booster energy of 800 MeV, 2 GeV today). The cavities have a flat design, to fit the ring-to-ring distance of 36 cm. The tube for forced-air cooling is visible in the left front. See also 8301084.

  17. Accelerating RF cavity of the Booster

    CERN Multimedia

    1983-01-01

    Each of the 4 PS Booster rings has a single accelerating cavity.It consists of 2 quarter-wave ferrite-loaded resonators. 2 figure-of-eight loops tune the frequency throughout the accelerating cycle, from 3 to 8 MHz (from 50 MeV at injection to the original Booster energy of 800 MeV, 2 GeV today). The cavities have a flat design, to fit the ring-to-ring distance of 36 cm, and are forced-air cooled. The 2 round objects in the front-compartments are the final-stage power-tetrodes. See also 8111095.

  18. The electron accelerator for the AWAKE experiment at CERN

    Science.gov (United States)

    Pepitone, K.; Doebert, S.; Burt, G.; Chevallay, E.; Chritin, N.; Delory, C.; Fedosseev, V.; Hessler, Ch.; McMonagle, G.; Mete, O.; Verzilov, V.; Apsimon, R.

    2016-09-01

    The AWAKE collaboration prepares a proton driven plasma wakefield acceleration experiment using the SPS beam at CERN. A long proton bunch extracted from the SPS interacts with a high power laser and a 10 m long rubidium vapour plasma cell to create strong wakefields allowing sustained electron acceleration. The electron bunch to probe these wakefields is supplied by a 20 MeV electron accelerator. The electron accelerator consists of an RF-gun and a short booster structure. This electron source should provide beams with intensities between 0.1 and 1 nC, bunch lengths between 0.3 and 3 ps and an emittance of the order of 2 mm mrad. The wide range of parameters should cope with the uncertainties and future prospects of the planned experiments. The layout of the electron accelerator, its instrumentation and beam dynamics simulations are presented.

  19. Sharing resources@CERN

    CERN Multimedia

    2002-01-01

    The library is launching a 'sharing resources@CERN' campaign, aiming to increase the library's utility by including the thousands of books bought by individual groups at CERN. This will improve sharing of information among CERN staff and users. Until now many people were unaware that copies of the same book (or standard, or journal) are often held not only by the library but by different divisions. (Here Eduardo Aldaz, from the PS division, and Isabel Bejar, from the ST division, read their divisional copies of the same book.) The idea behind the library's new sharing resources@CERN' initiative is not at all to collect the books in individual collections at the CERN library, but simply to register them in the Library database. Those not belonging to the library will in principle be unavailable for loan, but should be able to be consulted by anybody at CERN who is interested. "When you need a book urgently and it is not available in the library,' said PS Division engineer Eduardo Aldaz Carroll, it is a sham...

  20. The PS locomotive runs again

    CERN Multimedia

    2001-01-01

    Over forty years ago, the PS train entered service to steer the magnets of the accelerator into place... ... a service that was resumed last Tuesday. Left to right: Raymond Brown (CERN), Claude Tholomier (D.B.S.), Marcel Genolin (CERN), Gérard Saumade (D.B.S.), Ingo Ruehl (CERN), Olivier Carlier (D.B.S.), Patrick Poisot (D.B.S.), Christian Recour (D.B.S.). It is more than ten years since people at CERN heard the rumbling of the old PS train's steel wheels. Last Tuesday, the locomotive came back into service to be tested. It is nothing like the monstrous steel engines still running on conventional railways -just a small electric battery-driven vehicle employed on installing the magnets for the PS accelerator more than 40 years ago. To do so, it used the tracks that run round the accelerator. In fact, it is the grandfather of the LEP monorail. After PS was commissioned in 1959, the little train was used more and more rarely. This is because magnets never break down, or hardly ever! In fact, the loc...

  1. submitter Radiation Protection Studies for CERN LINAC4/SPL Accelerator Complex

    CERN Document Server

    Mauro, Egidio; Silari, Marco

    2009-01-01

    CERN is presently designing a new chain of accelerators to replace the present Proton Synchrotron (PS) complex: a 160 MeV room-temperature H$^-$ linac (Linac4) to replace the present 50 MeV proton linac injector, a 3.5 GeV Superconducting Proton Linac (SPL) to replace the 1.4 GeV PS booster (PSB) and a 50 GeV synchrotron (named PS2) to replace the 26 GeV PS. Linac4 has been funded and the civil engineering work started in October 2008, whilst the SPL is in an advanced stage of design. Beyond injecting into the future 50 GeV PS, the ultimate goal of the SPL is to generate a 4 MW beam for the production of intense neutrino beams. The radiation protection design is driven by the latter requirement. This thesis summarizes the radiation protection studies conducted for Linac4. FLUKA Monte Carlo simulations, complemented by analytical estimates, were performed 1) to evaluate the propagation of neutrons through the waveguide, ventilation and cable ducts placed along the accelerator, 2) to estimate the radiological i...

  2. BROOKHAVEN: Booster boost

    International Nuclear Information System (INIS)

    After three months of intensive dedicated machine studies, Brookhaven's new Booster accelerated 5 x 1013 protons over four cycles, about 85% of the design intensity. This was made possible by careful matching of Linac beam into the Booster and by extensive resonance stop band corrections implemented during Booster acceleration. The best single cycle injection into the AGS Alternating Gradient Synchrotron was 1.14 x 1013 protons from the Booster. 1.05 x 1013 protons were kept in the AGS, a 92% combined efficiency of extraction, transfer, and injection. The maximum injected 1994 shutdown period, enabling the 1994 physics run to make use of the full Booster intensity and go for the stated AGS objective of 4x1013 protons per pulse

  3. BROOKHAVEN: Booster commissioned

    International Nuclear Information System (INIS)

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  4. Progress in the Construction of Linac4 at CERN

    CERN Document Server

    Vretenar, M; Baudrenghien, P; Bertone, C; Body, Y; Broere, J; Brunner, O; Bellodi, G; Buzio, M; Carli, C; Roncarolo, F; Ramberger, S; Raich, U; Puccio, B; Paoluzzi, M; Nisbet, D; Mikulec, B; Mathot, S; Maglioni, C; Lopez-Hernandez, LA; Lombardi, A; Lallement, J B; Lettry, J; Kozsar, I; Hansen, J; Hanke, K; Hammouti, L; Gerigk, F; Garoby, R; Funken, A; Fuchs, J F; Dos Santos, N; Dallocchio, A; Coupard, J; Corso, JP; Scrivens, R; Schwerg, N; Vollaire, J; Zickler, T; Weisz, S; Wegner, R; Vandoni, G; Rossi, C

    2013-01-01

    As first step of the LHC luminosity upgrade program CERN is building a new 160 MeV H¯ linear accelerator, Linac4, to replace the ageing 50 MeV Linac2 as injector to the PS Booster (PSB). Linac4 is an 86-m long normalconducting linac made of a 3 MeV injector followed by 22 accelerating cavities of three different types. The general service infrastructure has been installed in the new tunnel and surface building and its commissioning is progressing; high power RF equipment is being installed in the hall and installations in the tunnel will start soon. Construction of the accelerator parts is in full swing involving industry, the CERN workshops and a network of international collaborations. The injector section including a newly designed and built H¯ source, a 3-m long RFQ and a chopping line is being commissioned in a dedicated test stand. Beam commissioning of the linac will take place in steps of increasing energy between 2013 and 2015. From end of 2014 Linac4 could deliver 50 MeV protons i...

  5. People and things. CERN Courier, Jun 1979, v. 19(4)

    International Nuclear Information System (INIS)

    On 1 April, six months ahead of schedule, electrons were injected into the 8 GeV electron-positron storage ring, CESR, at Cornell. Two weeks later beam was accumulated at an energy of 5.5 GeV. The contract for the management and construct/on of the conventional facilities of the ISABELLE 400 GeV proton storage rings to be built at the Brookhaven Laboratory has been awarded to the New York firm of Ammann and Whitney. Greatly helped by the quality of the beams from the new linac, the CERN 800 MeV four-ring Booster has achieved several new records which bode well for the role it has to play with the PS in feeding the high energy machines in the coming years

  6. Feasibility Study of the PS Injection for 2 GeV LIU Beams with an Upgraded KFA-45 Injection Kicker System Operating in Short Circuit Mode

    CERN Document Server

    Kramer, Thomas; Borburgh, Jan; Ducimetière, Laurent; Feliciano, Luis; Ferrero Colomo, Alvaro; Goddard, Brennan; Sermeus, Luc

    2016-01-01

    Under the scope of the LIU project the CERN PS Booster to PS beam transfer will be modified to match the requirements for the future 2 GeV beams. This paper describes the evaluation of the proposed upgrade of the PS injection kicker. Different schemes of an injection for LIU beams into the PS have been outlined in the past already under the aspect of individual transfer kicker rise and fall time performances. Homogeneous rise and fall time requirements in the whole PSB to PS transfer chain have been established which allowed to consider an upgrade option of the present injection kicker system operated in short circuit mode. The challenging pulse quality constraints require an improvement of the flat top and post pulse ripples. Both operation modes, terminated and short circuit mode are analysed and analogue circuit simulations for the present and upgraded system are outlined. Recent measurements on the installed kickers are presented and analysed together with the simulation data. First measurements verifying...

  7. Vertical distributor in the Booster injection line

    CERN Multimedia

    1979-01-01

    The beam from the 50 MeV linac filled the 4 rings of the PS Booster(originally 800 MeV, now 1.4 GeV) one after the other (in multiturn injection). A fast-switchable vertical steering magnet, the "distributor", directed the beam first to the top ring (nb.4), and after a preset number of turns to next lower ring, and so on. After filling the bottom ring, the tail of the linac beam was directed into a dump.

  8. High duty factor plasma generator for CERN's Superconducting Proton Linac

    International Nuclear Information System (INIS)

    CERN's Linac4 is a 160 MeV linear accelerator currently under construction. It will inject negatively charged hydrogen ions into CERN's PS-Booster. Its ion source is a noncesiated rf driven H- volume source directly inspired from the one of DESY and is aimed to deliver pulses of 80 mA of H- during 0.4 ms at a 2 Hz repetition rate. The Superconducting Proton Linac (SPL) project is part of the luminosity upgrade of the Large Hadron Collider. It consists of an extension of Linac4 up to 5 GeV and is foreseen to deliver protons to a future 50 GeV synchrotron (PS2). For the SPL high power option (HP-SPL), the ion source would deliver pulses of 80 mA of H- during 1.2 ms and operate at a 50 Hz repetition rate. This significant upgrade motivates the design of the new water cooled plasma generator presented in this paper. Its engineering is based on the results of a finite element thermal study of the Linac4 H- plasma generator that identified critical components and thermal barriers. A cooling system is proposed which achieves the required heat dissipation and maintains the original functionality. Materials with higher thermal conductivity are selected and, wherever possible, thermal barriers resulting from low pressure contacts are removed by brazing metals on insulators. The AlN plasma chamber cooling circuit is inspired from the approach chosen for the cesiated high duty factor rf H- source operating at SNS.

  9. The SPL Front End: A 3 MeV$H^{-}$ Test Stand at CERN

    CERN Document Server

    Rossi, C; Caspers, Friedhelm; Garoby, R; Genest, J; Hanke, K; Hori, Masaki; Küchler, D; Lombardi, A M; Magistris, M; Millich, Antonio; Paoluzzi, M; Sargsyan, E; Silari, M; Steiner, T; Vretenar, M; Beauvais, Pierre Yves; Ausset, P; LINAC'04

    2004-01-01

    In the frame of the SPL (Superconducting Proton Linac) study at CERN, a new 160 MeV proton injector for the CERN PS Booster is presently under development. This linear accelerator (Linac4) would not only be a first step towards a future, multi-MW superconducting linac, but would also improve in the medium term both the beam availability and beam quality for CERN’s proton users. Within the framework of the Linac4 study and with the support of the EU funded Joint Research Activity HIPPI (High Intensity Pulsed Proton Injectors), a 3 MeV test stand is under construction at CERN. This test stand will explore some of the most critical issues of the linac, such as the beam dynamics at low energy, with special emphasis on the chopper line that has been designed to generate the required time structure of the beam, to clean the beam halo, and to match it to the subsequent RF structures. In this context, a new Beam Shape and Halo Monitor is under construction. The beam acceleration will be performed by an RFQ that is ...

  10. CERN Choir

    CERN Multimedia

    Staff Association

    2015-01-01

      Do you like singing? The CERN Choir is looking for basses and tenors Join us! Programme Spring Session 2015: Donizetti: Misere & Missa di Gloria e Credo Bellini: Salve Regina Bruckner: Requiem in D minor Next concert: Sunday 31 May 2015 at 17:00 Musicales de Comesières (GE) Rehearsals at CERN Main Auditorium, building 500 On Wednesdays from 20.00 to 22:00 Membership fee: January to June 150 CHF September to December: 100CHF Contact: Baudouin.bleus@cern.ch Facebook/Choeur-du-CERN

  11. PS Main Control Room (partial view)

    CERN Multimedia

    1974-01-01

    Jean-Pierre Potier (turning buttons) and Bertran Frammery (telephoning) on shift. The 26 GeV Synchrotron and later also its related machines (Linacs 1,2,3; PS-Booster; LEP-Injector Linacs and Electron-Positron Accumulator; Antiproton Accumulator, Antiproton Collector, Low Energy Antiproton Ring and more recently Antiproton Decelerator) were all controlled from the PS control room situated on the Meyrin site. The SPS and LEP were controlled from a separat control centre on the Prevessin site. In 2005 all controls were transferred to the Prevessin centre.

  12. Neutrinos at CERN

    International Nuclear Information System (INIS)

    CERN's long and distinguished neutrino tradition began in 1958 at the then new 500 MeV synchrocyclotron (SC) with the first observation of the decay of a charged pion into an electron and a neutrino. At that time, the first ideas on the special (vector/axial vector) structure of the weak interactions had been put forward by Feynman and Gell-Mann and by Marshak and Sudarshan, but the continual non-observation of that charged pion decay was holding up progress. This decay is only one part in ten thousand, and is masked by the dominant muon-neutrino channel. A special telescope was built to pick up the high energy electrons from the pion decay. In 1962 came another SC neutrino success, with the first measurement of the decay of a charged pion into a neutral one, with emission of an electron and a neutrino. Meanwhile the main thrust of CERN's neutrino effort was taking shape at the PS. By the close of 1960, CERN had decided to attack neutrino physics using several detectors - a 1m heavy liquid bubble chamber from Andre Lagarrigue's team in Paris, a CERN 1 m heavy liquid bubble chamber, and a hybrid chamber/counter from a group led by Helmut Faissner

  13. Courrier CERN

    CERN Multimedia

    2015-01-01

    Example of the cover page of the French version of the CERN Courier; Courrier CERN from January 1962. The journal was published both in English and French up to volume 45, no. 5, June 2005. Since then there is a single-language edition where articles are published either in French or English with an abstract in the other language.

  14. CERN & Society

    CERN Multimedia

    2016-01-01

    Non Member State Summer Students 2015 are interviewed about their decision to study STEM subjects, to apply for CERN NMSSS programme, their experience onsite @CERN and takeaways, their future goals and aspirations, offering also advice to fellow students.The Non Member State Summer Student Programme stands for a unique opportunity for students from all over the world to spend their summer at CERN in Geneva, getting involved in some of the world’s biggest experiments. For 8 weeks, summer students gather on-site at CERN and join in the day-to-day work of research. The Programme targets advanced undergraduate and beginning graduate students of physics, computing and engineering, particularly from developing countries. Participating students receive scientific training, attend lectures and work on laboratory-based projects alongside with CERN experts and fellow students.

  15. YALINA Booster conversion project

    International Nuclear Information System (INIS)

    The YALINA Booster subcritical assembly was constructed at the Joint Institute for Power and Nuclear Research (JIPNR)-SOSNY, Belarus to examine the physics of Accelerator Driven Systems (ADS). The assembly has fast and thermal zones to study the coupling between the two zones, the transuranics transmutation, and the ADS kinetics. It is driven by external neutron source located at the assembly center. The central fast zone (the booster zone) consists of high enriched uranium (HEU) fuel rods loaded in a lead matrix and it is surrounded by thermal zone. The thermal zone has low enriched uranium (LEU) fuel rods loaded in polyethylene moderator. Between the two zones, there is a thermal neutron absorber zone. (JIPNR)-SOSNY has an International Science and Technology Center project in collaboration with Argonne National Laboratory of USA to convert the HEU fuel of YALINA Booster to LEU fuel without penalizing its performance. The first step of this project is to characterize and define the performance of the YALINA Booster subcritical assembly with HEU fuel by performing detailed analytical and experimental studies. The second step is to convert the booster zone to use uranium fuel rods with 21% enrichment. The YALINA Booster configuration is modified to reach the original subcriticality level. The analytical analyses have developed accurate calculational models without geometrical approximations for performing Monte Carlo and Deterministic calculations. MCNP, MCNPX, MCB, MONK, ERANOS, and PARTISN computer codes with different nuclear data libraries based on ENDF/VI, JEF2.2, and JEF3.1 have been used for static and kinetic analyses. The geometrical details are included explicitly without approximation or homogenization. In the experimental program, the subcriticality has been measured as a function of the number of the fuel rods loaded in the subcritical assembly. Different methods have been used to measure the assembly subcriticality during the fuel loading process. In

  16. CERN Rocks

    CERN Multimedia

    2004-01-01

    The 15th CERN Hardronic Festival took place on 17 July on the terrace of Rest 3 (Prévessin). Over 1000 people, from CERN and other International Organizations, came to enjoy the warm summer night, and to watch the best of the World's High Energy music. Jazz, rock, pop, country, metal, blues, funk and punk blasted out from 9 bands from the CERN Musiclub and Jazz club, alternating on two stages in a non-stop show.  The night reached its hottest point when The Canettes Blues Band got everybody dancing to sixties R&B tunes (pictured). Meanwhile, the bars and food vans were working at full capacity, under the expert management of the CERN Softball club, who were at the same time running a Softball tournament in the adjacent "Higgs Field". The Hardronic Festival is the main yearly CERN music event, and it is organized with the support of the Staff Association and the CERN Administration.

  17. Experiments at CERN in 1984

    International Nuclear Information System (INIS)

    This book is a compilation of the current experimental program at CERN. The experiments listed are being performed at one of the following machines: the Super Proton Synchrotron (SPS), the Proton Synchrotron (PS) and the Synchro-Cyclotron (SC). The Intersecting Storage Rings (ISR) have ceased functioning early this year. The four approved experiments to be done by means of the Large Electron Positron machine (LEP) are also listed. (orig./HSI)

  18. Inside CERN : Devoiler l'inaccessible

    CERN Multimedia

    Denis Postle; Edwin Shaw

    1974-01-01

    Presentation of what goes on at CERN. Animation of protons going around a ring, then sent to a target and detectors look at them. SC. PS. ISR. Interesting animation: a red light is superimposed on the accelerator to indicate the beam path. (PS and ISR) BEBC. Scanning, with a nice moment of the tracks arriving. Omega. Tracks. Map showing where SPS will be. The Robbins. Other aspects of SPS construction: magnets, RF cavaties, vacuum tube.

  19. CERN choir

    CERN Multimedia

    2004-01-01

    Don't forget a special performance of Joseph Haydn's Creation, an oratorio in three parts, given by the CERN choir and the Annecy choir Pro Musica, this Sunday at 8.30 p.m. at the Grand Casino. Tickets (38 CHF) are available at Fnac Rive and Balexert.

  20. Robot adventures at CERN

    CERN Multimedia

    2015-01-01

    Imagine if the CERN robots had an end-of-year party... From retrieving data tapes to handling material safely, the robots at CERN fulfill numerous tasks. Find out more: http://cern.ch/go/VjX7 Produced by: CERN Video Productions Director: Christoph M. Madsen Copyright © 2015 CERN. Terms of use: http://copyright.web.cern.ch/

  1. Space Shuttle booster recovery planning.

    Science.gov (United States)

    Godfrey, R. E.

    1973-01-01

    At the initiation of the Space Shuttle Program, recoverable solid rocket boosters were base-lined, with an estimated savings of 30 per cent over expendable solid rockets. Present studies indicate that the solid rocket boosters in the 142-inch diameter range can be recovered using state-of-the-art recovery systems. Marshall Space Flight Center is conducting extensive studies to establish the most cost effective recovery system for the present Shuttle boosters. Model drop testing, in various facilities, and structural load testing are being conducted with model sizes ranging from 6 inches to 120 inches in diameter.

  2. Conceptual design report: superconducting booster

    International Nuclear Information System (INIS)

    The Superconducting Booster project includes the construction of a new high-voltage injector and buncher for the existing tandem, a magnetic transport system, an rf linac with superconducting resonators, and a rebuncher-debuncher. The booster will fit in existing space so that a new building is not required. The layout of the accelerator is given in Fig. I-1. The University of Washington is contributing approximately $1 M to this project

  3. Continuous synchronization scheme for TRIUMF KAON Factory Booster and Collector by heterodyne with intermediate frequency

    International Nuclear Information System (INIS)

    Often it arises that several batches of protons must be transferred in box-car fashion from a Booster to Main Ring synchrotron. When the combination (i) large change in kinematic β, (ii) γ-transition close to γ-beam, (iii) small radial aperture confining Δp/ps steering, and (iv) absence of magnetic flat top, occur in the Booster, then conventional phase slip methods of synchronization become infeasible. An alternative is to heterodyne the Booster revolution frequency with an intermediate frequency (of predetermined phase variation) so as to produce a signal equal to a harmonic of the main ring revolution frequency. This allows elaboration of a synchronization control. This paper describes computer modelling of the synchronization technique, as applied to the KAON Factory Booster and Collector, including the effects of error sources and beam-control loops. 4 figs

  4. Inauguration of POPS: the new power system of the PS

    CERN Multimedia

    Maximilien Brice

    2010-01-01

    Pictures 03 and 04 : The team from the Electrical Power Converters Group (TE/EPC) is joined by the Director of Accelerators, the heads of the BE, TE and FI departments, CERN managers and Converteam representatives in a group portrait in front of three of the containers that house the capacitor banks of the PS's new power supply system, POPS. Pictures 01, 06 and 07 : Magid-Michel Saikaly, energy and infrastructure director at Converteam, receives a prize from Steve Myers, Director of Accelerators at CERN, for the development and fabrication of the new electrical power system for the PS, called POPS.

  5. Spatial and temporal beam profile monitor with nanosecond resolution for CERN's Linac4 and Superconducting Proton Linac

    CERN Document Server

    Hori, M

    2008-01-01

    The Linac4, now being developed at CERN, will provide 160-MeV H- beams of high intensity . Before this beam can be injected into the CERN Proton Synchrotron Booster or future Superconducting Proton Linac for further acceleration, some sequences of 500-ps-long micro-bunches must be removed from it, using a beam chopper. These bunches, if left in the beam, would fall outside the longitudinal acceptance of the accelerators and make them radioactive. We developed a monitor to measure the time structure and spatial profile of this chopped beam, with respective resolutions and . Its large active area and dynamic range also allows investigations of beam halos. The ion beam first struck a carbon foil, and secondary electrons emerging from the foil were accelerated by a series of parallel grid electrodes. These electrons struck a phosphor screen, and the resulting image of the scintillation light was guided to a thermoelectrically cooled, charge-coupled device camera. The time resolution was attained by applying high-...

  6. UK @ CERN

    CERN Multimedia

    FI Department

    2008-01-01

    17 – 18 November 2008 9.00 a.m. - 5.00 p.m. on Monday 17 November 9.00 a.m. - 5.00 p.m. on Tuesday 18 November Individual meetings will take place in the technicians’ or engineers’ offices. The companies will contact relevant users/technicians but anyone wishing to arrange an appointment with a specific company can contact Caroline Laignel (mailto:caroline.laignel@cern.ch, tel. 73722). A list of the companies is available from all departmental secretariats and on the web at: http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm List of companies: 1. Caburn MDC Europe Ltd. 2. Croft Engineering Services 3. Cryox Ltd. 4. Goodfellow Cambridge Ltd. 5. Gravatom Engineering Systems Ltd. 6. High Voltage Technology 7. Lilco Ltd. 8. Micro Metalsmiths Ltd. 9. Photek Ltd. 10. Shadow Robot Company 11. Sundance Multiprocessor Technology Ltd. 12. Tessella plc 13. Thermal Resources Management Ltd. 14. Torr Scientific Ltd. For further information please contact Mrs C. Laignel, FI-DI, tel. 7372...

  7. CERN back to its roots

    CERN Multimedia

    2004-01-01

    History came full circle on Saturday 23 October, when CERN's 50th anniversary celebrations drew to a close with a ceremony at Geneva University's Institut de Physique. For it was here, on the banks of the River Arve, that CERN's first staff members, from the PS Magnets Group, came to work in October 1953. Since that day, there has not been a break in the collaboration between CERN and the Institut de Physique de Genève. "We cooperate very closely in the fields of experimental and theoretical particle physics, of course, but also in applied and materials physics," says Alain Blondel, Professor at Geneva University (ATLAS member and neutrino factory promoter) and organiser of the ceremony. "For instance, the Physics Section has just developed a superconducting magnet capable of reaching a continuous magnetic field of 21.3 Tesla, which is of great interest to CERN." The ceremony, interspersed with "cosmic" musical interludes, was an opportunity to recall this partnership that is more than fifty years old. A c...

  8. CERN moves to http://home.cern

    CERN Multimedia

    2015-01-01

    A new top-level domain for CERN will be inaugurated next week, with the migration of the core website to http://home.cern.   The new home.cern webpage. The .cern top-level domain is intended for the exclusive use of CERN and its affiliates, and will soon be open for applications from within the community. Clear governance mechanisms for registration and management of .cern domains have been put in place. Applications for domains may be submitted by current members of the CERN personnel, and must be sponsored by a CERN entity such as a department, experiment, project or CERN-recognised experiment. For more information please refer to the registration policy. The acquisition of the .cern top-level domain was negotiated via ICANN’s new gTLD programme by a board comprising members of the CERN Legal Service, Communications group and IT department. .cern is one of over 1,300 new top-level domains that will launch over the coming months and years. The .cern domain nam...

  9. Aerial view of CERN under the snow

    CERN Multimedia

    1963-01-01

    In this photograph taken in the winter of 1963, CERN still looks quite bare under its mantle of snow. The Proton Synchrotron (PS), resembling a bicycle wheel in shape, had been in operation since the summer of 1959. A proposal had just been made for the site of CERN's second large project, the Intersecting Storage Rings (ISR): France was to house the world's first proton-proton collider. In September 1965, the French authorities signed an agreement making more than 40 hectares of land available for the extension of the CERN site established in Switzerland into French territory. The ISR project received final approval from the CERN Council in December 1965. The civil engineering work on the French part began in November 196

  10. EDH 'Millionaire' in PS Division

    CERN Multimedia

    2001-01-01

    Christmas cheer! Left to right: Gerard Lobeau receives a bottle of Champagne from Derek Mathieson and Jurgen De Jonghe in recognition of EDH's millionth document. At 14:33 on Monday 3 December a technician in PS division, Gerard Lobeau, unwittingly became part of an important event in the life of CERN's Electronic Document Handling system (EDH). While ordering some pieces of aluminum for one of the PS's 10Mhz RF cavities, he created EDH document number 1,000,000. To celebrate the event Derek Mathieson (EDH Project Leader) and Jurgen De Jonghe (Original EDH Project Leader) presented Mr Lobeau with a bottle of champagne. As with 93% of material requests, Mr Lobeau's order was delivered within 24 hours. 'I usually never win anything' said Mr Lobeau as he accepted his prize, 'I initially though there may have been a problem with EDH when the document number had so many zeros in it, and was then surprised to get a phone call from you a few minutes later.' The EDH team had been monitoring the EDH document number ...

  11. Look into the PS Main Control Room (partial view)

    CERN Document Server

    1974-01-01

    Jean-Pierre Potier at work. The 26 GeV Synchrotron and later also its related machines (Linacs 1,2,3; PS-Booster, LEP-Injector Linacs and Electron-Positron Accumulator; Antiproton Accumulator, Antiproton Collector, Low Energy Antiproton Ring and more recently Antiproton Decelerator) were all controlled from the PS control room situated at the Meyrin site. The SPS and LEP were controlled from a separat control centre on the Prevessin site. In 2005 all controls were transferred to the Prevessin centre.

  12. CERN technology in the service of medicine

    CERN Multimedia

    2001-01-01

    The prototype of the first module of the LInac BOster (LIBO) has been constructed and tested at CERN. This new medical accelerator offers new perspectives in deep-seated tumour treatment.   Accelerator technology developed at CERN is set to bring about important advances in cancer therapy. The linac booster - LIBO - project aims to build a 3GHz proton linear accelerator to boost to 200 MeV the energy of the beam from 50-70 MeV cyclotrons, existing in several hospitals and laboratories. This will allow deep-seated tumours to be treated (see box). The prototype of the first LIBO module has just passed high power RF tests at CERN. Two members of the LIBO collaboration, Riccardo Zennaro and Paolo Berra, with the first LIBO module installed in the LIL tunnel. The LIBO idea goes back to 1993 when it was conceived by CERN's Ugo Amaldi, founder of Italy's TERA foundation. From the beginning, Mario Weiss, a former CERN staff member has led the project. A decisive step was taken in 1998 when a collaboration...

  13. Experiments at CERN in 1979

    International Nuclear Information System (INIS)

    The 1979 catalogue of approved experiments at CERN has been compiled as a guide to the status of the experimental research programme at the 400 GeV Proton Synchrotron (SPS), the Intersecting Storage Rings (ISR), the 25 GeV Proton Synchrotron (PS), and the Synchrocyclotron (SC). The schematic layouts of beams and experiments at the various machines are given in the beginning of the report and are followed by descriptive material on the experiments. In general, a short summary of each of the approved experiments is given, with a description of the physics purpose, the apparatus employed, a list of the participants and the name of the collaboration. (Auth.)

  14. Experiments at CERN in 1997

    International Nuclear Information System (INIS)

    This book summarises the current experimental programme at CERN. The experiments listed are taking place at one of the following machines: the Large Electron Positron Collider (LEP), the Super Proton Synchroton (SPS), the 28 GeV Proton Synchrotron (PS), including the Antiproton Decelerator (AD) for slow antiprotons and the ISOLDE facility for short-lived ions. The three experiments now approved for installation at the Large Hadron Collider (LHC) and the R and D projects aimed at the development of new detector technologies and data acquisition systems for the LHC experiments are also listed. (orig./WL)

  15. The PS complex as proton pre-injector for the LHC - design and implementation report

    International Nuclear Information System (INIS)

    The LHC will be supplied with protons from the pre-injector chain comprising Linac2, PS Booster and PS. These accelerators have undergone a major upgrading programme during the last five years so as to meet the stringent requirements of the LHC. This implies that many high-intensity bunches of small emittance and tight spacing (25 ns) be available at the PS extraction energy (26 GeV/c). The upgrading project involved an increase of Linac2 current, new RF systems in the PS Booster and the PS, raising the PS Booster energy from 1 to 1.4 GeV, two-batch filling of the PS, and the installation of high-resolution beam profile measurement devices. With the project entering its final phase and most of the newly installed hardware now being operational, the emphasis switches to producing the nominal LHC beam and tackling the associated beam physics problems. This report describes all the hardware changes related to the upgrading project. (orig.)

  16. LS1 Report: PS beams are back!

    CERN Multimedia

    Katarina Anthony & Anaïs Schaeffer

    2014-01-01

    For the first time in over 15 months, there are beams back in the PS. Making their first tour of the accelerator today, 20 June, their injection marks the end of weeks of cold checkouts and hardware commissioning in the PS.   The CERN Control Centre (CCC) is back in business: people gather to restart the LHC injectors, today the PS. Since hardware commissioning was wrapped up on 23 May, the Operations Group (BE-OP) has been conducting cold checkouts on the PS. This involves switching on all of the machine's systems, verifying that they respond to commands by OP and ensuring they are calibrated to beam timings. "These verifications were done, in part, during the hardware commissioning dry runs," says Rende Steerenberg, PS section leader. "But the cold checkouts are on a much larger scale, as we act as if there is beam in the whole machine. We placed a full load on the controls system, cooling, networks, etc. in order to setup the accelerator in the most realis...

  17. The AGS-Booster lattice

    International Nuclear Information System (INIS)

    The AGS Booster has three objectives. They are to increase the space charge limit of the AGS, to increase the intensity of the polarized proton beam by accumulating many linac pulses (since the intensity is limited by the polarized ion source), and to reaccelerate heavy ions from the BNL Tandem Van de Graaff before injection into the AGS. The machine is capable of accelerating protons at 7.5 Hertz from 200 MeV to 1.5 GeV or to lower final energies at faster repetition rates. The machine will also be able to accelerate heavy ions from as low as 1 MeV/nucleon to a magnetic rigidity as high as 17.6 Tesla-meters with a one second repetition rate. As an accumulator for polarized protons, the Booster should be able to store the protons at 200 MeV for several seconds. We expect that the Booster will increase the AGS proton intensity by a factor of four, polarized proton intensity by a factor of twenty to thirty, and will also enable the AGS to accelerate all species of heavy ions (at present the AGS heavy ion program is limited to the elements lighter than sulfur because it can only accelerate fully stripped ions). The construction project started in FY 1985 and is expected to be completed in 1989. The purpose of this paper is to provide a future reference for the AGS Booster lattice

  18. FNAL booster: Experiment and modeling

    Energy Technology Data Exchange (ETDEWEB)

    Panagiotis Spentzouris; James Amundson

    2003-06-02

    We present measurements of transverse and longitudinal beam phase space evolution during the first two hundred turns of the FNAL Booster cycle. We discuss the experimental technique, which allowed us to obtain turn-by-turn measurements of the beam profile. The experimental results are compared with the prediction of the Synergia 3D space charge simulation code.

  19. UK @ CERN

    CERN Multimedia

    FI Department

    2008-01-01

    17 – 18 November 2008 9.00 a.m. - 5.00 p.m. on Monday 17 November 9.00 a.m. - 5.00 p.m. on Tuesday 18 November Individual meetings will take place in the technicians’ or engineers’ offices. The companies will contact relevant users/technicians but anyone wishing to arrange an appointment with a specific company can contact Caroline Laignel (caroline.laignel@cern.ch, tel. 73722). A list of the companies is available from all departmental secretariats and on the web here. List of companies: 1. Caburn MDC Europe Ltd. 2. Croft Engineering Services 3. Cryox Ltd. 4. Goodfellow Cambridge Ltd. 5. Gravatom Engineering Systems Ltd. 6. High Voltage Technology 7. Lilco Ltd. 8. Micro Metalsmiths Ltd. 9. Photek Ltd. 10. Shadow Robot Company 11. Sundance Multiprocessor Technology Ltd. 12. Tessella plc 13. Thermal Resources Management Ltd. 14. Torr Scientific Ltd. For further information please contact Mrs C. Laignel, FI-DI, tel. 73722.

  20. Final Report of the PS Radiation Working Group

    CERN Document Server

    Bruno, L; Nonis, M; Otto, T; Steerenberg, R; Vincke, H; Vojtyla, P; Widorski, M

    2011-01-01

    Final Report of the PS Radiation Working Group The Proton Synchrotron, inaugurated in 1959, plays a central role in CERN’s accelerator complex as an injector to higher-energy synchrotrons (SPS, LHC). In CERN’s new strategy for particle accelerators, the PS shall provide protons for the LHC and the fixed target program for 25 more years, until about 2035. Technical consolidation of the PS and the PS Booster seem to be a cost-effective measure to deliver protons to LHC in this period. The consolidation must also include aspects of safety and environmental protection. While a renovated PS will not be able to match the safety performance of a newly built accelerator, it must be at least assured that all safety and environmental risks are within the perimeter of present laws and regulations. If possible, safety performance shall exceed these minimal standards by a large margin. The PS Radiation Working Group (“the working group”) has been investigating those hazards of continued operation of the PS pertain...

  1. Inside CERN : Grosse Maschinen fur kleinste teilchen

    CERN Multimedia

    CERN Public Information Office

    1974-01-01

    A service station with a difference. Presentation of what goes on at CERN. Animation of protons going around a ring, then sent to a target and detectors look at them. SC. PS. ISR. Interesting animation: a red light is superimposed on the accelerator to indicate the beam path. (PS and ISR) BEBC. Scanning, with a nice moment of the tracks arriving. Omega. Tracks. Map showing where SPS will be. The Robbins. Other aspects of SPS construction: magnets, RF cavaties, vacuum tube.Comments : Calm, well constructed presentation without much film imagination, aside from the red light/beam animation.

  2. Supervision Software for the Integration of the Beam Interlock System with the CERN Accelerator Complex

    CERN Document Server

    Audrain, M; Dragu, M; Fuchsberger, K; Garnier, JC; Gorzawski, AA; Koza, M; Krol, K; Moscatelli, A; Puccio, B; Stamos, K; Zerlauth, M

    2014-01-01

    The Accelerator complex at the European Organisation for Nuclear Research (CERN) is composed of many systems which are required to function in a valid state to ensure safe beam operation. One key component of machine protection, the Beam Interlock System (BIS), was designed to interface critical systems around the accelerator chain, provide fast and reliable transmission of beam dump requests and trigger beam extraction in case of malfunctioning of equipment systems or beam losses. Numerous upgrades of accelerator and controls components during the Long Shutdown 1 (LS1) are followed by subsequent software updates that need to be thoroughly validated before the restart of beam operation in 2015. In parallel, the ongoing deployments of the BIS hardware in the PS booster (PSB) and the future LINAC4 give rise to new requirements for the related controls and monitoring software due to their fast cycle times. This paper describes the current status and ongoing work as well as the long-term vision for the integratio...

  3. Performance of the CERN PSB at 160 MeV with $H^{-}$ charge exchange injection

    CERN Document Server

    AUTHOR|(CDS)2084247; Santoni, Claudio

    As part of the LHC Injectors Upgrade Project, the CERN PS Booster (PSB) will be upgraded with a H- charge exchange injection system and its injection energy will be raised from 50 MeV to 160 MeV to obtain the beam brightness required for the LHC High-Luminosity Upgrade. Space charge effects like beam losses and transverse emittance blow-up at injection are expected to be the main limitations towards the achievement of the required high brightness. Studies of beam dynamics in presence of space charge in order to evaluate the performances of the PSB after the Upgrade have been performed. The first part of the work consists of measurements in the present machine, to study the effects of space charge and its interplay with resonances and to have a good set of data for code benchmarking. The code chosen for the beam tracking in presence of space charge is PTC-Orbit (and PyOrbit). Necessary numerical convergence studies are presented together with a benchmark with the PSB measurements. Once assessed the code and it...

  4. Fermilab Booster Correction Elements upgrade

    International Nuclear Information System (INIS)

    The Fermilab Booster Correction Element Power Supply System is being upgraded to provide significant improvements in performance and versatility. At the same time these improvements will compliment raising the Booster injection energy from 200 MeV to 400 MeV and will allow increased range of adjustment to tune, chromaticity, closed orbit and harmonic corrections. All correction elements will be capable of ramping to give dynamic orbit, tune and chromaticity control throughout the acceleration cycle. The power supplies are commercial switch mode current sources capable of operating in all four current-voltage quadrants. External secondary feedback loops on the amplifiers have extended the small signal bandwidth to 3 kHz and allow current ramps in excess of 1000 A/sec. Implementation and present status of the upgrade project is described in this paper. (author) 4 refs., 2 figs., 1 tab

  5. AHF Booster Tracking with SIMPSONS.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, D. E. (David E.); Neri, F. (Filippo)

    2002-01-01

    The booster lattice for the Advanced Hydrotest Facility at Los Alamos was tracked in 3-D with the program SIMPSONS, using the full, symplectic lattice from TEAPOT, using the full set of magnet and misalignment errors, as well as full space-charge effects. The only corrections included were a rough closed-orbit correction and chromaticity correction. The lattice was tracked for an entire booster cycle, from multi-turn injection through acceleration to the top energy of 4 GeV, approximately 99,000 turns. An initial injection intensity of 4x1Ol2, injected in 25 turns, resulted in a final intensity of 3 . 2 {approx} 1 0a' {approx}t 4 GeV. Results of the tracking, including emittance growth, particle loss, and particle tune distributions are presented.

  6. Review of superconducting booster linacs

    International Nuclear Information System (INIS)

    Several superconducting boosters have been built and more are planned or under construction. These all use a number of independently phased resonators to permit acceleration of a wide variety of ion masses. For heavy ions, vhf frequencies are involved, and operation of the superconductors at 4.3 K, the normal boiling point of He, is practical. (Because fundamental losses in superconductors depend on frequency, some electron accelerators using much higher frequencies require colder resonators.) For boosters the resonator technology has evolved toward the use of quarter wave resonators with straight loading arms. The superconducting material is either niobium or lead. The latter is deposited as a film on copper, while the former may be sheet metal, may be bonded to copper, or may be (in principle) applied as a film on copper. The trade-offs involved and the successes of the various techniques are discussed. The rf must be controlled accurately both with regard to amplitude and phase. Because of the high unloaded Q of the resonators, additional loading is provided at some temperature well above that of the superconductor, in order to increase the bandwidth to a manageable point. Most boosters provide active control of phase by shifting the driving phase, although at least one system uses a frequency switching technique. Cross talk between independent resonator control systems must be avoided. The cryogenic systems have evolved toward a system based on a large helium refrigerator using turbine expansion and providing gas cooling to heat shields. Conservative design provides excess capacity beyond the expected requirements of the accelerator. Cryogenic distribution must be done carefully to avoid losses, and the system should be designed with capacity to match that of anticipated upgrades of the refrigerator. Most boosters use an approximately periodic focusing system with radial phase advance near 90deg per unit cell. (orig./HSI)

  7. The new heart of the PS is beating strongly

    CERN Multimedia

    Corinne Pralavorio

    2011-01-01

    The PS has resumed operation with a brand new electrical power system called POPS; this enormous system comprising power electronics and capacitors is crucial because if it broke down practically no particles would be able to circulate at CERN. As soon as it started, POPS passed all the tests with flying colours and is now pulsing at full power.   The new PS power system is made up of 6 containers, each with 60 tonnes of capacitors and 8 power converters. The date 11/02/11 will always be remembered with affection by the engineers in the Electrical Power Converters Group. At 11:11 in the morning (no joke), the first beams powered by the new system began to circulate in the PS. The cutely-named POPS (POwer for PS) took over from the old rotating machine that had been working since 1968. From now on it will be POPS that supplies the PS main magnets with the electrical pulses needed to accelerate the beams for the LHC and all CERN's other facilities. The system is crucial as the PS is one of the lyn...

  8. A day in the CERN Control Centre

    CERN Multimedia

    Rosaria Marraffino

    2015-01-01

    The CERN Control Centre (CCC) is the nerve centre of the CERN beam systems. From this room, the experts prepare, monitor, adjust, and control the particle beams that circulate throughout the accelerator complex while ensuring that the services and the technical infrastructure work flawlessly. Buttons, screens, telephones, lights (but no sound): in the CCC, everything is ready to make it possible for the LHC to reach the unprecedented energies expected at Run 2.   Seen from above, the CERN Control Centre resembles the shape of a quadrupole magnet. The consoles are distributed in four circles, called “islands”, dedicated to the LHC, the SPS, the PS Complex and the Technical Infrastructure (TI) respectively. Spread between TI and LHC are the Cryogenics consoles. Being in the same room allows the 24h-manned islands to be constantly in touch with one another, thus ensuring the best performance of the machines. At the LHC island, operators are currently busy training the magnet...

  9. Last PS magnet refurbished

    CERN Multimedia

    2009-01-01

    PS Magnet Refurbishment Programme Completed. The 51st and final refurbished magnet was transported to the PS on Tuesday 3 February. The repair and consolidation work on the PS started back in 2003 when two magnets and a busbar connection were found to be faulty during routine high-voltage tests. The cause of the fault was a combination of age and radiation on electrical insulation. After further investigation the decision was taken to overhaul half of the PS’s 100 magnets to reduce the risk of a similar fault. As from 20 February the PS ring will start a five-week test programme to be ready for operation at the end of March.

  10. Hangout with CERN: Welcome to CERN (S01E01)

    CERN Multimedia

    Kahle, Kate

    2012-01-01

    In this first Hangout with CERN "Welcome to CERN" ATLAS physicist Steven Goldfarb, CERN theorist Alvaro De Rujula and Mick Storr from the CERN education group introduce CERN and answer some of the questions received via #askCERN on Twitter and Google+. Recorded live on 1st November 2012.

  11. Virgin Galactic explores CERN

    CERN Multimedia

    2016-01-01

    Virgin Galactic visited CERN with a group of future astronauts and Sir Richard Branson. During their visit the group was shown around various experiments, including the Globe, SM18, AMS and the CERN Control Centre.

  12. Doing business with CERN

    CERN Multimedia

    2015-01-01

    The Procurement Service, in collaboration with the Communications group’s Design team, has recently launched a new information campaign targeted at companies wishing to supply their products and services to CERN. This campaign comprises:   A brochure, available in hard and soft copy:  http://procurement.web.cern.ch/brochures/doing-business-with-cern.   A 6-minute video overview: https://procurement-dev.web.cern.ch/doing-business-with-cern. This campaign is intended for Member State firms with whom CERN is yet to do business. The key objectives are: To emphasise that CERN can be considered a major customer across a wide range of activities;   To present CERN’s procurement procedures in a dynamic and digestible way;   To highlight the information available on CERN’s procurement website: http://procurement.web.cern.ch. Furthermore, a new section called “Having a contract with CERN” is also now ava...

  13. CERN Shop Christmas Sale

    CERN Multimedia

    Visits & Exhibition Service/ETT-VE

    2001-01-01

    11-13.12.2001 Looking for Christmas present ideas? Come to the Reception Shop Special Stand in Meyrin, Main Building, ground floor, from Tuesday 11 to Thursday 13 December from 10.30 to 16.00. CERN Calendar 10.- CERN Sweat-shirts(M, L, XL) 30.- CERN T-shirt (M, L, XL) 20.- New CERN silk tie (2 colours) 35.- Fancy silk tie (blue, bordeau) 25.- Silk scarf (light blue, red, yellow) 35.- Swiss army knife with CERN logo 25.- CERN watch 25.- CERN baseball cap 15.- CERN briefcase 15.- Book 'Antimatter' (English) 35.- Book 'How the web was born' (English) 25.- The Search for Infinity (French, Italian, English, German) 40.-   If you miss this special occasion, the articles are also available at the Reception Shop in Building 33 from Monday to Saturday between 08.30 and 17.30 hrs.

  14. The Tohoku University Stretcher-Booster Ring

    International Nuclear Information System (INIS)

    The Tohoku University Stretcher-Booster Ring Project was approved this year. This ring plays three roles: the pulse beam stretcher, the booster and the storage ring for the internal target nuclear experiment. It has four 3.1 m long straight sections and its circumference is 50 m. The maximum energy is 300 MeV as the stretcher and 1.2 GeV as the booster. (author)

  15. The CERN Library

    CERN Multimedia

    Hester, Alec G

    1968-01-01

    Any advanced research centre needs a good Library. It can be regarded as a piece of equipment as vital as any machine. At the present time, the CERN Library is undergoing a number of modifications to adjust it to the changing scale of CERN's activities and to the ever increasing flood of information. This article, by A.G. Hester, former Editor of CERN COURIER who now works in the Scientific Information Service, describes the purposes, methods and future of the CERN Library.

  16. Greece at CERN

    CERN Multimedia

    CERN Press Office. Geneva

    1997-01-01

    Greece, one of CERN*'s founding Member States, inaugurated its first Industrial Exhibition at the Meyrin site on Tuesday, 14 October. After a meeting with CERN's Director General, Professor Christopher Llewellyn Smith, Professor Emmanuel Frangoulis, the General Secretary of the Greek Ministry of Industry, accompanied by Prof Emmanuel Floratos, Greek delegate to CERN council visited the DELPHI experiment on the LEP collider, guided by Andromachi Tsirou, a Greek physicist.

  17. France at CERN

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    Rolf Heuer, CERN Director General, visits the exhibition "La France au CERN". The exhibition France at CERN, organized by UBIFRANCE in collaboration with CERN's GS/SEM (Site Engineering and Management) service, took place from Monday 7 to Wednesday 9 June in the Main Building. The 36 French firms taking part came to present their products and technologies related to the Organization's activities. The next exhibition will be "Netherlands at CERN" in November.

  18. Atlas SOHO Booster and Centaur Erection

    Science.gov (United States)

    1995-01-01

    The launch vehicle for the Solar Heliospheric Observatory (SOHO) mission is a two stage Atlas-IIAS (Atlas/Centaur). The Atlas, consists of a solid rocket booster stage powered by four Thiokol Castor IVA solid rocket boosters (SRB) and a core vehicle stage (booster and sustainer) powered by Rocketdyne MA-5A liquid propellant engines (RP-1 fuel and liquid oxygen). The multiple firing Centaur is powered by two Pratt and Whitney (RL10A-4) liquid hydrogen and liquid oxygen engines with extendible nozzles. This video shows the erection of the Atlas booster and transportation (to 36-B launching pad) and erection of the Centaur.

  19. CERN Photowalk 2015

    CERN Multimedia

    2015-01-01

    CERN is organising a Photowalk on Friday 25 September 2015. At this event a few selected photographers will get the chance to come to CERN, the European Organization for Nuclear Research, for an exclusive behind-the-scenes tour of the laboratory. For more information: http://photowalk2015.web.cern.ch/

  20. In the CERN Library

    CERN Multimedia

    1963-01-01

    Seen in this picture is Noria Christophoridou, librarian of the Greek Atomic Energy Commission, who has been sent by her government to CERN for a year to widen her experience of library and documentation services. In the photograph she is providing information to Kurt Gottfried, a CERN visiting scientist from Harvard University, who is spending a year with CERN's Theory Division

  1. CERN visit for a Norwegian Prize-winner

    CERN Multimedia

    2002-01-01

    One of the prize-winners of the Contest «Life in the Universe», the final of which was held at CERN during the Science and Technology Week in November 2001 (See Bulletin n°47/2002), came to CERN to receive his prize last June. The 15-year old Norwegian Ivar Marthinusen won a two-day visit to the Laboratory. He poses on the picture surrounded by his CERN's guardian angels: from left to right, Frank Tecker and Georges-Henry Hemelsoet from PS, Tommy Eriksson from AD, Sandrine Sanchez from the Visits Service, Ivar Mathinusen with his parents, Egil Lillestol (CERN/EP), Jens Vigen from the Library, Régine Chareyron from the Visits Service, Richard Jacobsson (CERN/EP) and Sophie Baillard from the Visits Service.

  2. At PS171 (ASTERIX)

    CERN Multimedia

    1983-01-01

    The ASTERIX (Antiproton Stop Experiment with tRigger on Initial X-rays) spectrometer was setup by the CERN-Mainz-Munich-Orsay-Vancouver (TRIUMF)-Zurich Collaboration to study ppbar interactions at rest in a hydrogen gas target, and to measure the fundamental state of the exotic proton-antiproton atom produced for the purpose. Ugo Gastaldi (from back), E. Klempt (right).

  3. Progress with the AGS Booster

    International Nuclear Information System (INIS)

    Rare K-decay, neutrino and heavy ion physics demands that a rapid- cycling high vacuum and high intensity Booster be built for the AGS at Brookhaven. For each mode of operation there are corresponding accelerator physics and design issues needing special attention. Problems pertinent to any single mode of operation have been encountered and solved before, but putting high intensity proton requirements and high vacuum heavy ion requirements into one machine demands careful design considerations and decisions. The lattice design and magnet characteristics will be briefly reviewed. Major design issues will be discussed and design choices explained. Finally, the construction status and schedule will be presented. 6 refs., 6 figs

  4. Booster double harmonic setup notes

    Energy Technology Data Exchange (ETDEWEB)

    Gardner, C. J. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.

    2015-02-17

    The motivation behind implementing a booster double harmonic include the reduced transverse space charge force from a reduced peak beam current and reduced momentum spread of the beam, both of which can be achieved from flattening the RF bucket. RF capture and acceleration of polarized protons (PP) is first set up in the single harmonic mode with RF harmonic h=1. Once capture and acceleration have been set up in the single harmonic mode, the second harmonic system is brought on and programmed to operate in concert with the single harmonic system.

  5. Collide@CERN Geneva

    CERN Document Server

    CERN. Geneva; Kieffer, Robert; Blas Temino, Diego; Bertolucci, Sergio; Mr. Decelière, Rudy; Mr. Hänni, Vincent

    2014-01-01

    CERN, the Republic and Canton of Geneva, and the City of Geneva are delighted to invite you to “Collide@CERN Geneva Music”. Come to the public lecture about collisions between music and particle physics by the third winners of Collide@CERN Geneva, Vincent Hänni & Rudy Decelière, and their scientific inspiration partners, Diego Blas and Robert Kieffer. The event marks the beginning of their residency at CERN, and will be held at the CERN Globe of Science and Innovation on 16 October 2014 at 19.00. Doors will open at 18.30.

  6. CERN Cricket Club

    CERN Multimedia

    CERN Cricket Club

    2010-01-01

    CERN Cricket Club Match Reports The cricket season is well under way, despite the weather, and several matches have been played. The match reporters have, however, found it too difficult to limit their reports to ¼ of a page, hence the reports have not appeared in the bulletin. All reports can be found at http://cern.ch/Club-Cricket/reports/reports.html The list of forthcoming matches can be consulted at http://cern.ch/Club-Cricket/fixtures.html Further information about the CERN Cricket Club can be found at http://cern.ch/Club-Cricket/

  7. Britain at CERN

    CERN Multimedia

    CERN Press Office. Geneva

    1996-01-01

    On 8 October, H.E. Mr David Beattie, British Ambassador to Switzerland, Mr John R. Nichols, H.M. Consul-General in Geneva and, Prof. Christopher Llewellyn Smith, CERN*'s Director General, formally opened the industrial exhibition of thirty-three British hi-tech companies at CERN, which takes place from 8 to 11 October, 1996. The exhibition offers British companies the opportunity to display their products in fields that are of immediate importance to the scientists, engineers and technicians working at CERN, and also to scientists from non-Member States who take part in research projects at CERN.

  8. CERN honours Georges Charpak

    CERN Multimedia

    2009-01-01

    CERN pays tribute to the work of Georges Charpak at a colloquium in honour of his 85th birthday. var flash_video_player=get_video_player_path(); insert_player_for_external('Video/Public/Movies/2009/CERN-MOVIE-2009-008/CERN-MOVIE-2009-008-0753-kbps-480x360-25-fps-audio-64-kbps-44-kHz-stereo', 'mms://mediastream.cern.ch/MediaArchive/Video/Public/Movies/2009/CERN-MOVIE-2009-008/CERN-MOVIE-2009-008-Multirate-200-to-753-kbps-480x360.wmv', 'false', 480, 360, 'https://mediastream.cern.ch/MediaArchive/Video/Public/Movies/2009/CERN-MOVIE-2009-008/CERN-MOVIE-2009-008-posterframe-480x360-at-10-percent.jpg', '1167500', true, 'Video/Public/Movies/2009/CERN-MOVIE-2009-008/CERN-MOVIE-2009-008-0600-kbps-maxH-360-25-fps-audio-128-kbps-48-kHz-stereo.mp4'); Watch the video conference of Georges Charpak.   On 9 March CERN’s Main Auditorium was the venue for a fascinating and moving celebration marking the 85th birthday of Georges Charpak, who was awarded the Nobel Prize for Physics in 1992 for his inven...

  9. CERN Holiday Gift Guide

    CERN Multimedia

    2013-01-01

    Do you have last-minute gifts to get? Stuck for ideas? The CERN Shop and the ATLAS and CMS secretariats have some wonderfully unique gifts and stocking-fillers for sale this year - perfect for the physics fanatics in your life. Let's take a look...   1. CERN Notebook, 10 CHF - 2. CERN Pop-up book, 30 CHF - 3. USB Stick 8GB, 25 CHF - 4. CERN Tumbler, 12 CHF 5. ATLAS 3D Viewer, 5 CHF - 6. ATLAS Puzzle, 15 CHF - 7. CMS Umbrella, 25 CHF   These gifts are all available at the CERN Shop, with the exception of the ATLAS 3D Viewer and the CMS umbrella, which are only available from the respective secretariats. Don’t forget! If you’re from CERN, you still have time to take advantage of a 10% off discount at the CERN shop. Offer ends 20 December.

  10. Booster Applications Facility report: Addendum

    International Nuclear Information System (INIS)

    This proposal is based on the conceptual design and feasibility study (BNL report number-sign 52291) which was performed at the request, and with the support of NASA's Life Sciences Division. The BNL Booster, which is now being successfully commissioned with protons, will undergo similar tests and initial heavy-ion operation in early 1992. This accelerator is a fast cycling synchrotron, and therefore capable of sequentially delivering independent alternate pulses of different ions for two applications. Thus, after a pulse is injected in the Alternating Gradient Synchrotron (AGS) for further acceleration, there will be ample time to deliver a pulse of a different ion to a proposed Booster Applications Facility (BAF) before the next AGS pulse is required. Cost effective BAF operation and reliable beam delivery would result. This is guaranteed by the need to maintain all the systems in good operating condition for the main mission of the facility, which is the injection of AGS, and eventually of the Relativistic Heavy Ion Collider (RHIC). A large variety of high-Z high-energy (HZE) particles can be produced, ranging from maximum energies of 1.5 GeV/AMU for ions lighter than iron, to ∼1.25 GeV/AMU for iron, and to ∼350 MeV/AMU for gold

  11. PS Control Room

    CERN Multimedia

    1963-01-01

    The good old PS Control Room, all manual. For each parameter, a knob or a button to control it; for each, a light or meter or oscilloscope to monitor it; carefully written pages serve as the data bank; phones and intercom for communication. D.Dekkers is at the microphone, M.Valvini sits in front.

  12. PS auxiliary magnet

    CERN Multimedia

    1974-01-01

    Units of the PS auxiliary magnet system. The picture shows how the new dipoles, used for vertical and horizontal high-energy beam manipulation, are split for installation and removal so that it is not necessary to break the accelerator vacuum. On the right, adjacent to the sector valve and the windings of the main magnet, is an octupole of the set.

  13. Immune responses of elk to initial and booster vaccinations with Brucella abortus strain RB51 or 19.

    Science.gov (United States)

    Olsen, S C; Fach, S J; Palmer, M V; Sacco, R E; Stoffregen, W C; Waters, W R

    2006-10-01

    Previous studies have suggested that currently available brucellosis vaccines induce poor or no protection in elk (Cervus elaphus nelsoni). In this study, we characterized the immunologic responses of elk after initial or booster vaccination with Brucella abortus strains RB51 (SRB51) and 19 (S19). Elk were vaccinated with saline or 10(10) CFU of SRB51 or S19 (n=seven animals/treatment) and booster vaccinated with a similar dosage of the autologous vaccine at 65 weeks. Compared to nonvaccinates, elk vaccinated with SRB51 or S19 had greater (PS19 after initial vaccination and after booster vaccination. Compared to nonvaccinated elk, greater (PS19 (22 weeks) treatment groups. In general, proliferative responses of vaccinates to nonautologous antigens did not differ (P>0.05) from the responses of nonvaccinated elk. Gamma interferon production in response to autologous or nonautologous Brucella antigens did not differ (P>0.05) between controls and vaccinates after booster vaccination. Flow cytometric techniques suggested that proliferation occurred more frequently in immunoglobulin M-positive cells, with differences between vaccination and control treatments in CD4+ and CD8+ subset proliferation detected only at 22 weeks after initial vaccination. After booster vaccination, one technique ([3H]thymidine incorporation) suggested that proliferative responses to SRB51 antigen, but not S19 antigen, were greater (PBrucella antigens in S19 or SRB51 vaccinates after booster vaccination. Although some cellular immune responses were detected after initial or booster vaccination of elk with SRB51 or S19, our data suggest that responses tend to be transient and much less robust than previously reported in SRB51-vaccinated cattle (Bos taurus) or bison (Bison bison). These data may explain why the vaccination of elk with S19 and SRB51 induces poor protection against brucellosis. PMID:17028213

  14. CERN Table Tennis Club

    CERN Multimedia

    CERN Table Tennis Club

    2014-01-01

    CERN Table Tennis Club Announcing CERN 60th Anniversary Table Tennis Tournament to take place at CERN, from July 1 to July 15, 2014   The CERN Table Tennis Club, reborn in 2008, is encouraging people at CERN to take more regular exercise. This is why the Club, thanks to the strong support of the CERN Staff Association, installed last season a first outdoor table on the terrace of restaurant # 1, and will install another one this season on the terrace of Restaurant # 2. Table tennis provides both physical exercise and friendly social interactions. The CERN Table Tennis club is happy to use the unique opportunity of the 60th CERN anniversary to promote table tennis at CERN, as it is a game that everybody can easily play, regardless of level. Table tennis is particularly well suited for CERN, as many great physicists play table tennis, as you might already know: “Heisenberg could not even bear to lose a game of table tennis”; “Otto Frisch played a lot of table tennis;...

  15. Possibility of a higher PSB to PS transfer energy

    CERN Document Server

    Hanke, K; Blas, A; Borburgh, J; Bozzini, D; Buzio, M; Capatina, O; Carli, C; Dobers, T; Fernandez, L; Findlay, A; Folch, R; Gilardoni, S; Gilbert, N; Hermanns, T; Mahner, E; Mikulec, B; Newborough, A; Nonis, M; Olek, S; Paoluzzi, M; Pittet, S; Ruehl, I; Rumolo, G; Steerenberg, R; Tan, J; Tommasini, D; Weterings, W; Widorski, M; Shaposhnikova, E

    2011-01-01

    Following the Chamonix 2010 workshop a task force has been set up to study the feasibility and the impact of an energy upgrade of the PS Booster from the present 1.4 GeV to about 2 GeV. The working group has confirmed the feasibility of such an upgrade, and analysed in detail the impact on the accelerator hardware along with a cost estimate and a tentative planning. The outcome of the task force will be summarized, with particular emphasis on the remaining limitations, risks and uncertainties.

  16. CERN and the environment

    CERN Multimedia

    Corinne Pralavorio

    2016-01-01

    New webpages answer common questions about CERN and the environment.   One of the new public webpages dedicated to CERN and the environment. Do your neighbours ever ask you about CERN’s environmental impact? And about radiation in particular? If so, the answers to those questions can now be found online on a new set of public webpages dedicated to CERN and the environment. These pages, put together by the Occupational Health, Safety and Environmental Protection (HSE) unit and the groups responsible for CERN's site maintenance, contain a wealth of information on topics linked to the environment, such as biodiversity at CERN, waste management, ionising radiation, and water and electricity consumption. “CERN forms part of the local landscape, with its numerous sites and scientific activities. It’s understandable that people living nearby have questions about the impact of these activities and it’s important that we respond with complete transp...

  17. German visits to CERN

    CERN Multimedia

    2007-01-01

    State secretary to Germany's Federal Ministry of Education and Research, Frieder Meyer-Krahmer, with CERN's Director-General Robert Aymar.On 21 February, Professor Frieder Meyer-Krahmer, State Secretary to Germany's Federal Ministry of Education and Research, came to CERN. He visited the ALICE and ATLAS experiments and the computing centre before meeting the CERN's Director-General, some German physicists and members of the top management. The Minister of Science, Research and the Arts of the Baden-Württemberg regional government, Peter Frankenberg, and CERN's Director-General, Robert Aymar, signing an agreement on education. In the background: Sigurd Lettow, CERN's Director of Finance and Human Resources, and Karl-Heinz Meisel, Rector of the Fachhochschule Karlsruhe. The Minister of Science, Research and the Arts of the Baden-Württemberg regional government, Prof. Peter Frankenberg, visited CERN on 23 February. He was accompanied by the Rector of the Fachhochschule Karlsruhe, Prof. Karl-Heinz Meisel, and b...

  18. Germany at CERN

    CERN Multimedia

    2005-01-01

    From left to right: Maximilian Metzger, CERN's Secretary-General, Hermann Schunck, Director at the German Federal Ministry of Education and Research, and Robert Aymar, CERN's Director-General, talking to Wolfgang Holler from Butting, one of the companies at the "Germany at CERN" exhibition. Far right : Susanne-Corinna Langer-Greipl from BMBF, delegate to the CERN Finance Committee. For three days, CERN's Main Building was transformed into a showcase for German industry. Twenty-nine companies from sectors related to particle physics (electrical engineering, vacuum and low temperature technology, radiation protection, etc.) were here for the ninth "Germany at CERN" exhibition, organised by the German Federal Ministry of Education and Research (BMBF), which gave them the opportunity to meet scientists and administrators from the Laboratory. On 1 March the exhibition was visited by a German delegation headed by Dr Hermann Schunck, Director at BMBF.

  19. Young Artists@ CERN

    CERN Document Server

    2004-01-01

    In view of 50th anniversary of CERN, about 20 young artists will be visiting CERN from 26 to 31 January to learn about the laboratory's research and the mysterious world of particle physics. The impressions they take home will be the main inspiration for the artwork they will then produce for an exhibition to be inaugurated in October 2004 as part of CERN's 50th anniversary celebration. We are looking for scientists who are interested in the Art-Science synergy and who can volunteer to discuss their work at CERN to these young artists during this week (25-31/01). Please contact renilde.vanden.broeck@cern.ch if you are interested. The project is called Young Artists@ CERN and for more information look at this website: http://www.hep.ucl.ac.uk/~andy/CERNart/

  20. CERN Cricket club

    CERN Multimedia

    CERN Cricket club

    2015-01-01

    The CERN Cricket Club 2015 season begins soon, the first net practice is scheduled (weather permitting) for Thursday April 16th, at 18:00! The club is always looking for new players and newcomers will be made very welcome. Anyone who is interested in joining the club should sign up on our web site: http://cern.ch/Club-Cricket/ or turn up for net practice, which takes place each Thursday evening from April 16th (apart from CERN official holidays) until the end of September (starting at 18:00 to around 19:30) at the CERN Prévessin site: http://club-cricket.web.cern.ch/Club-Cricket/CERN-Ground.html The first match will be at home on Sunday, April 19th against Rhone CC from Lyon.

  1. CERN Relay Race

    CERN Multimedia

    CERN Running Club

    2010-01-01

    The CERN relay race will take place around the Meyrin site on Thursday 20 May, starting at 12.15. If possible, please avoid driving on the site during this 20-minute period. If you do meet runners while driving your car, please STOP until they have all passed. Thank you for your cooperation. Details on the route, and how to register your team for the relay race, can be found at: https://espace.cern.ch/Running-Club/CERN-Relay

  2. The CERN PC farm

    CERN Multimedia

    Serge Bellegarde

    2005-01-01

    Housed in the CERN Computer Centre, these banks of computers process and store data produced on the CERN systems. When the LHC starts operation in 2008, it will produce enough data every year to fill a stack of CDs 20 km tall. To handle this huge amount of data, CERN has also developed the Grid, allowing the processing power to be shared between computer centres around the world.

  3. Radiation protection at CERN

    OpenAIRE

    Forkel-Wirth, Doris; Roesler, Stefan; Silari, Marco; Streit-Bianchi, Marilena; Theis, Christian; Vincke, Heinz; Vincke, Helmut

    2013-01-01

    This paper gives a brief overview of the general principles of radiation protection legislation; explains radiological quantities and units, including some basic facts about radioactivity and the biological effects of radiation; and gives an overview of the classification of radiological areas at CERN, radiation fields at high-energy accelerators, and the radiation monitoring system used at CERN. A short section addresses the ALARA approach used at CERN.

  4. The AGS Booster vacuum systems

    Energy Technology Data Exchange (ETDEWEB)

    Hseuh, H.C.

    1989-01-01

    The AGS Booster is a synchrotron for the acceleration of both protons and heavy ions. The design pressure of low 10{sup {minus}11} mbar is required to minimize beam loss of the partially stripped heavy ions. To remove contaminants and to reduce outgassing, the vacuum chambers and the components located in them will be chemically cleaned, vacuum fired, baked then treated with nitric oxide. The vacuum sector will be insitu baked to a minimum of 200{degree}C and pumped by the combination of sputter ion pumps and titanium sublimation pumps. This paper describes the design and the processing of this ultra high vacuum system, and the performance of some half-cell vacuum chambers. 9 refs., 7 figs.

  5. The AGS Booster vacuum systems

    International Nuclear Information System (INIS)

    The AGS Booster is a synchrotron for the acceleration of both protons and heavy ions. The design pressure of low 10-11 mbar is required to minimize beam loss of the partially stripped heavy ions. To remove contaminants and to reduce outgassing, the vacuum chambers and the components located in them will be chemically cleaned, vacuum fired, baked then treated with nitric oxide. The vacuum sector will be insitu baked to a minimum of 200 degree C and pumped by the combination of sputter ion pumps and titanium sublimation pumps. This paper describes the design and the processing of this ultra high vacuum system, and the performance of some half-cell vacuum chambers. 9 refs., 7 figs

  6. Tetanus Booster -A missed opportunity

    Directory of Open Access Journals (Sweden)

    Rajesh Gupta

    2014-06-01

    Full Text Available Tetanus a known childhood killer is an entirely preventable disease with tetanus toxoid (TT. Most of the research today is on neonatal tetanus owing to its high case fatality rate. Though the reported mortality with tetanus is lower in older age groups, the management of tetanus is still a challenge in resource constraint settings of developing countries like India. On this background the present study was designed to know the status of tetanus immunization among school going age group children. This was an OPD based survey targeting school going children (age of 5 to 18 years attending Pediatric out-patient department (OPD of a tertiary care teaching hospital. It was observed that out of 636, 299 (47% children were vaccinated for diphtheria, pertusis and tetanus (DPT booster at 5 years of age. Out of 374 children eligible for TT (10 to 16 years only 37 (9.8 % were immunized with TT at age 10 years. Out of 44 children at age of 16 years only 6 (13.6% were immunized. Though there are strategies to immunize school going children under routine immunization programme, official records documented that the immunization coverage for TT was 68% in school going age group. Majority of (80% the cases of tetanus were in non-neonatal age group (mainly school going group in Madhya Pradesh, India. Based on these observations it can be concluded that the tetanus immunization coverage among children of school going age was poor in the given setting.  Tetanus is an acute, spastic paralytic illness historically called lockjaw that is caused by the neurotoxin produced by Clostridium tetani. Tetanus occurs worldwide and is endemic in approximately 90 developing countries. Tetanus is an entirely preventable disease with active immunization with tetanus toxoid. A serum antibody titer of ≥0.01 U/mL is considered protective. [1] In India, according to National immunization schedule, active immunization against tetanus is done with administration of tetanus toxoid as

  7. Academic Training Lecture Regular Programme: Physics at the AD/PS/SPS

    CERN Multimedia

    2012-01-01

    Physics at the AD/PS/SPS (1/4), by Lau Gatignon (CERN).   Monday, June 18, 2012 from 11:00 to 12:00 (Europe/Zurich) at CERN ( 222-R-001 - Filtration Plant )   Lecture 1: The CERN injector complex and beams for non-LHC physics. The various machines and beam lines in the CERN injector complex are presented, from the linacs to the SPS. Special emphasis is given to the beam lines at the PS and SPS machines: AD, North and East Areas, nTOF and CNGS and HiRadMad as well as the ion beams. A short outlook is given to possible future upgrades and projects.   More information here.  

  8. CERN - better than science fiction!

    CERN Multimedia

    2007-01-01

    From left to right: Allan Cameron (Production Designer), Sam Breckham (Location Manager), James Gillies (Head of Communication at CERN), Jacques Fichet (from the CERN audiovisual service), Rolf Landua (former spokesman of the ATHENA antihydrogen experiment at CERN and Head of CERN's Education Group), Ron Howard, and Renilde Vanden Broeck (CERN press officer).

  9. Integrity at CERN

    CERN Document Server

    Department, HR

    2015-01-01

    In the fulfillment of its mission, CERN relies upon the trust and material support of its Member States and partners, and is committed to exercising exemplary stewardship of the resources with which it is entrusted. Accordingly, CERN expects the highest level of integrity from all its contributors (whether members of the personnel, consultants, contractors working on site, or persons engaged in any other capacity at or on behalf of CERN). Integrity is a core value of CERN, defined in the Code of Conduct as “behaving ethically, with intellectual honesty and being accountable for one’s own actions”.

  10. Britain at CERN

    CERN Multimedia

    2000-01-01

    H. E. Mr Christopher Hulse, Ambassador of United Kingdom in Switzerland, CERN Director General Luciano Maiani, Sir David Wright, Chief Executive of British Trade International and Roger Cashmore, CERN Director of research visit the Britain at CERN exhibition. From 14 to 17 November 30 British companies exhibited leading edge technologies at CERN. This is Britain's 18th exhibition at CERN since 1968. Out of the 30 companies, which attended the Britain at CERN exhibition in 1998, 25 have received an order or a contract relating to CERN during the last two years. The exhibition was inaugurated on Tuesday by Sir David Wright, Chief Executive of British Trade International. He was accompanied by H.E. Mr Christopher Hulse CMG, OBE, Her Majesty's Ambassador to Switzerland, and Mr. David Roberts, Deputy Head of Mission and Director of Trade Promotion at the British Embassy in Bern. CERN Director-General, Professor Luciano Maiani, underlined the major contribution of British physicists to CERN, pointing out the fact ...

  11. Dear CERN Computing Community,

    CERN Multimedia

    2003-01-01

    This is to remind you that LXPLUS6 cluster will be switched off on: Friday May 30th 2003 12:00 CET Please start using lxplus.cern.ch now to avoid unnecessary problems at the last minute. Note especially, that telnet and ftp to lxplus.cern.ch are not provided and will not work, instead secure protocols such as ssh and sftp should be used. Also LINUX6 resources in LXBATCH will no longer be available from the same date - Friday May 30th 2003 8:00 CET. See: http://cern.ch/plus/issues.html for other know issues. Vladimir Bahyl CERN/IT/FIO/FS

  12. Dear CERN Computing Community,

    CERN Multimedia

    2003-01-01

    This is to remind you that LXPLUS6 cluster will be switched off on: Friday May 30th 2003 12:00 CETPlease start using lxplus.cern.ch now to avoid unnecessary problems at the last minute. Note especially, that telnet and ftp to lxplus.cern.ch are not provided and will not work, instead secure protocols such as ssh and sftp should be used. Also LINUX6 resources in LXBATCH will no longer be available from the same date - Friday May 30th 2003 8:00 CET. See: http://cern.ch/plus/issues.html for other know issues. Vladimir Bahyl CERN/IT/FIO/FS

  13. PS ejection septum magnet.

    CERN Multimedia

    1993-01-01

    For the acceleration of lead ions in the PS, the residual gas pressure had to be lowered. Many components, amongst these the septum magnets, had to be replaced by new ones with a lower outgassing rate. This is the new ejection, installed at the beginning of 1994, to direct protons and lead ions into the transfer line to the SPS as part of the LHC pre-acceleration chain.

  14. Transfer line from the PSB to the PS (recombination)

    CERN Multimedia

    1976-01-01

    After sequential ejection of 5 bunches from each of the 4 rings of the Booster (originally 800 MeV, now 1.4 GeV), the 4 batches are brought to the same vertical level, so as to form a string of 20 bunches, filling the circumference of the PS. This vertical "recombination" is performed in the transfer line, using vertical bending magnets, septa and kickers. Here we see the section where the beam from ring 4 (the top one) is brought down to the level of ring 3, and the beam from ring 1 up to the level of ring 2. Further downstream (to the right, outside this picture), level 2 is brought up to level 3, identical to that of the PS. After this original recombination scheme, other ways of combining the 4 beams, vertically and/or longitudinally, were developed and used in operation.

  15. RESONANT EXTRACTION PARAMETERS FOR THE AGS BOOSTER

    International Nuclear Information System (INIS)

    Brookhaven's AGS Booster is the injector for the AGS. It is being modified to send resonant extracted heavy ions to a new beam line, the Booster Applications Facility (BAF). The design of the resonant extraction system for BAF was described in [1]. This note will give a more detailed description of the system and describe the predicted resonant beam time structure. We will describe tune space manipulations necessary to extract the resonant beam at the maximum Booster rigidity, schemes for performing resonant extraction, and describe the modifications required to perform bunched beam extraction to the BAF facility

  16. Qualitative analysis of low-lying resonances of the dipositronium emerging from Ps-Ps and Ps-Ps* collisions

    OpenAIRE

    Bao, C. G.; Shi, T. Y.

    1999-01-01

    An analysis of the channel wave functions is made to clarify the types of resonance emerging from Ps-Ps and Ps-Ps* collisions. The ordering of the energy levels of the states of the dipositronium is evaluated based on the inherent nodal structures of wave functions and on existing theoretical results. A few very probable low-lying narrower resonances, namely the 0+(A2), 1-(E),..., benefiting from the centrifugal barrier have been proposed.

  17. The PS Upgrade Program: Recent Advances

    CERN Document Server

    Gilardoni, SS; Bertone, C; Biancacci, N; Blas, A; Damjanovic, S; Bodart, D; Borburgh, J; Chiggiato, P; Damerau, H; Devine, JD; Dobers, T; Gourber-Pace, M; Hancock, S; Huschauer, A; Iadarola, G; Lopez Hernandez, LA; Masi, A; Mataguez, S; M´etral, E; Paoluzzi, M; Persichelli, S; Pittet, S; Rossi, C; Roesler, S; Rumolo, G; Salvant, B; Steerenberg, R; Sterbini, G; Vollaire, J; Wasef, R; Ventura, L; Yin Vallgren, C; Migliorati, M

    2013-01-01

    The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existing injector complex at CERN to match the future requirements of the HL-LHC (High Luminosity LHC). In this framework, the Proton Synchrotron (PS) will undergo fundamental changes for many of its main systems: the injection energy will be increased to reduce space-charge effects, the transverse damper will be improved to cope with transverse instabilities, and the RF systems will be upgraded to accelerate higher beam intensity and brightness. These hardware improvements are triggered by a series of studies meant to identify the most critical performance bottlenecks, like space charge, impedances, longitudinal and transverse instabilities, as well as electron-cloud. Additionally, alternative production schemes for the LHC-type beams have been proposed and implemented to circumvent some of the present limitations. A summary of the most recent advances of the studies, as well as the proposed hardware improvements is...

  18. The PS will soon be back in operation

    CERN Multimedia

    2006-01-01

    The PS's power supply system is undergoing repairs for the accelerator to restart on 26 June. The AB Department's Power Converter Group is working flat out with Siemens to return the PS's power supply system to working order. A problem appeared on the insulation of the power cables of the rotor of the rotating machine (photo) which supplies power to the PS magnets. To prevent more significant damage to the rotating machine, the AB Department, with the approval of the CERN Management, decided to shut down the PS which had started running on 15 May. Everything is being done to restart the accelerator on 26 June. The PS's rotating machine comprises a motor coupled to a generator. The generator's rotor acts like a flywheel, supplying high-power pulses of 40 to 50 megawatts to the PS magnets. The 6 megawatt motor drives the installation at 1000 revolutions per minute and compensates only for variations in speed. It is an essential interface since it would be hard to imagine connecting such an electrical charge, p...

  19. Romanian Visit to CERN

    CERN Multimedia

    2001-01-01

    Romanian Minister for Foreign Affairs, Mr Mircea Dan Geoana, visited CERN on 30 March to discuss collaboration between his country and the Laboratory. Above, Mr Dan Geoana signs the visitors' book in the presence of CERN Director General Luciano Maiani and Mrs Anda Flip, Ambassador and permanent representative of Romania at the United Nations.

  20. CERN's Early History Revisited

    CERN Multimedia

    Schopper, Herwig Franz; Krige, Gerhard John

    2005-01-01

    As a member of the group of historians charged to write the history of the founding of CERN, John Krige particularly underlines the important role I.I. Rabi played. The first author, former Director General of CERN add a few comments. S.A. Khan gives precisions about the role played by E. Amaldi and P. Auger; then J. Krige replies

  1. ESO: The CERN Years

    CERN Multimedia

    Schaeffer, A

    2012-01-01

    In 1970, CERN and ESO signed a collaboration agreement for the construction of the Observatory’s first telescope. That same year, ESO’s Telescope Division and Sky Atlas laboratory settled on the CERN site in Meyrin. Let’s turn back to the beginnings of this lasting and fruitful alliance.

  2. Punctualizaciones del CERN

    CERN Multimedia

    2002-01-01

    "Viene de la pagina anterior. Puntualizaciones del CERN. La valoracion que me merece la aprobacion en el Consejo de Ministros el 24 de mayo de un acuerdo de colaboracion entre el MCYT y el CERN para el proyecto de neutrinos al Gran Sasso es positiva" (1 page).

  3. Integration of CERN staff

    CERN Multimedia

    1965-01-01

    An example of the integration of CERN staff in the neighbouring communes is provided by the hamlet of Bugnon at St-Genis-Pouilly (Ain), FRance. The CERN installation on the Swiss site are visible on the left in the background. Behind them the Saleve mountain in Haute-Savoie.

  4. Child Care at CERN

    CERN Document Server

    CERN, Child Care Initiative

    2008-01-01

    This is a document summarizing a survey of child care needs of CERN staff and users which was performed in February 2008 by the CERN Child Care Initiative. The document presents the analysis of this data. Conclusions on the minimal facilities size are derived and possible funding source at the European Union are discussed.

  5. The CERN Accelerator School

    CERN Multimedia

    2016-01-01

    Introduction to accelerator physics This course will take place in Budapest, Hungary, from 2 to 14 October 2016. It is now open for registration and further information can be found at: http://cas.web.cern.ch/cas/Hungary2016/Hungary-advert.html and http://indico.cern.ch/event/532397/.

  6. CERN and the LHC

    CERN Multimedia

    Cramer, J G

    1992-01-01

    CERN, a high-energy physics laboratory in Europe, is planning to build a more powerful particle accelerator, the Large Hadronic Collider. The US spreads its accelerators around the country while most of Europe's research is conducted at and around CERN.

  7. CERN openlab Open Day

    CERN Multimedia

    Purcell, Andrew Robert

    2015-01-01

    The CERN openlab Open Day took place on 10 June, 2015. This was the first in a series of annual events at which research and industrial teams from CERN openlab can present their projects, share achievements, and collect feedback from their user communities.

  8. UK Mission to CERN

    CERN Multimedia

    2004-01-01

    At the end of June, nine experts from UK industry visited CERN to study techniques for developing distributed computing systems and to look at some specific applications. In a packed three-day programme, almost 40 CERN experts presented a comprehensive survey of achievements.

  9. France at CERN

    CERN Multimedia

    2001-01-01

    From 19 to 22 June, for the 8th edition of France at CERN, 31 French companies presented their latest technology to the Laboratory. Demonstrating the latest in French technology during France at CERN. The France at CERN exhibition was inaugurated by Mr. Bernard Frois, Director of the Department Energy, Transport, Environment and Natural Resources at the Technology Directorate of the Ministry of Research. 'France is happy to be a Member of CERN, which is a successful example of the construction of scientific Europe,' he declared during the inauguration, 'this exhibition is an excellent opportunity to put fundamental research and advanced technology in contact.' Mr. Philippe Petit, French Ambassador to Switzerland, and Mr. Alexandre Defay, technical adviser of the Minister of Research, were also present to represent France and its industry. Representing CERN at the 19 June opening of the exhibition was Claude Detraz, who said, 'I hope that this exhibition will make it possible to weave stronger links between ...

  10. CERN in the park

    CERN Multimedia

    2002-01-01

    CERN will be the centre of debate at a 'Café scientifique' on Monday 29 April. The aim of the Cafés scientifiques, which are organised by the association of Bancs Publics, is to kindle discussion between ordinary people and specialists in a scientific field. This Monday, Maurice Bourquin, President of the CERN Council, Hans Hoffmann, Director of Technology Transfer and Scientific Computing at CERN, Gilbert Guignard, a physicist at CERN, and Ruhal Floris, who teaches mathematical didactics at the University of Geneva, will explain the usefulness and contributions to science of the world's biggest laboratory for particle physics. What is CERN for? Monday 29 April at 18.30 Musée d'histoire des sciences, Geneva (in the park Perle du Lac) Entry free Wine and buffet after the discussion

  11. Romanian President Visits CERN

    CERN Multimedia

    2001-01-01

    Director General Luciano Maiani watches as Romanian President Ion Iliescu signs the CERN guest book. On Friday the 12th of October, Romanian President Ion Iliescu arrived at CERN and was warmly greeted by Director General Luciano Maiani at the steps of building 500. After initial greetings and a general presentation of the laboratory, President Iliescu and his entourage embarked on a whistle stop tour of the CERN facilities. They visited the CMS magnet assembly hall and civil engineering work where presentations were made by CMS spokesperson Michel Della Negra and the ATLAS Tile Calorimeter where the president was introduced to Romanian physicists working here at CERN. Michel Della Negra explains some of the general principles behind CMS to President Iliescu during his visit last week. The Romanian teams working on CERN projects make very visible contributions, for example to the construction of the ATLAS experiment and to the preparation of its eventual scientific exploitation. 'Those of us on the ATLAS ...

  12. CERN Mobility Survey

    CERN Multimedia

    GS Department

    2011-01-01

    The Institute of Shipping and Transport of the University of the Aegean and the National Technical University of Athens are partners with CERN in a study of mobility patterns between and within the CERN sites and to that effect have realized a mobility survey dedicated to the CERN community.         The study aims to understand: How you presently get around the CERN sites; What problems you encounter regarding mobility; What your needs are; What improvements you’d like to see; What measures you would like to see implemented most. The replies we receive will enable us to define a general policy promoting the diversity of mobility at CERN and to establish and quantify the strategic actions to be implemented for both the short and medium term. The objectives of the transport mobility plans are to: Facilitate mobility within and between the CERN sites by identifying adequate solutions in response to individual ...

  13. Lectures for CERN pensioners

    CERN Multimedia

    GS Department

    2009-01-01

    The CERN Medical Service and the Pensioners Association are pleased to invite CERN pensioners to a series of lectures given by professors and specialists from the Teaching Hospitals and the Faculty of Medicine of the University of Geneva on the following topic: PROMOTION OF OPTIMUM BRAIN AGEING The lectures will take place in the Main CERN Auditorium (Building 60) from 2.30 p.m. to 4.30 p.m. on the following dates: Thursday 15 January 2009: Diagnosing and treating Alzheimer’s disease Pr Gabriel GOLD Wednesday 25 February 2009: What is the brain reserve? Speaker’s name to be announced at a later date. The lectures will be given in French, with transparencies in English, and will be followed by a wide-ranging debate with the participants. CERN Medical Service - Pensioners Association - CERN-ESO (GAC-EPA)

  14. New beam instrumentation in the AGS Booster

    Energy Technology Data Exchange (ETDEWEB)

    Witkover, R.L.

    1991-01-01

    The AGS Booster was designed to accelerate beams from 2{times}10{sup 10} polarized protons to 1.5{times}10{sup 13} protons and heavy ions through Au{sup +33}. The range of beam parameters and the high vacuum, and radiation environment presented challenges for the beam instrumentation. Some interesting beam monitors in the Booster and transport lines, will be described. Where available, results will be presented. 21 refs., 7 figs.

  15. Gas Test Loop Booster Fuel Hydraulic Testing

    Energy Technology Data Exchange (ETDEWEB)

    Gas Test Loop Hydraulic Testing Staff

    2006-09-01

    The Gas Test Loop (GTL) project is for the design of an adaptation to the Advanced Test Reactor (ATR) to create a fast-flux test space where fuels and materials for advanced reactor concepts can undergo irradiation testing. Incident to that design, it was found necessary to make use of special booster fuel to enhance the neutron flux in the reactor lobe in which the Gas Test Loop will be installed. Because the booster fuel is of a different composition and configuration from standard ATR fuel, it is necessary to qualify the booster fuel for use in the ATR. Part of that qualification is the determination that required thermal hydraulic criteria will be met under routine operation and under selected accident scenarios. The Hydraulic Testing task in the GTL project facilitates that determination by measuring flow coefficients (pressure drops) over various regions of the booster fuel over a range of primary coolant flow rates. A high-fidelity model of the NW lobe of the ATR with associated flow baffle, in-pile-tube, and below-core flow channels was designed, constructed and located in the Idaho State University Thermal Fluids Laboratory. A circulation loop was designed and constructed by the university to provide reactor-relevant water flow rates to the test system. Models of the four booster fuel elements required for GTL operation were fabricated from aluminum (no uranium or means of heating) and placed in the flow channel. One of these was instrumented with Pitot tubes to measure flow velocities in the channels between the three booster fuel plates and between the innermost and outermost plates and the side walls of the flow annulus. Flow coefficients in the range of 4 to 6.5 were determined from the measurements made for the upper and middle parts of the booster fuel elements. The flow coefficient for the lower end of the booster fuel and the sub-core flow channel was lower at 2.3.

  16. Longitudinal damping system for the Fermilab Booster

    International Nuclear Information System (INIS)

    The general idea behind the damping system is to take from the beam-spectrum the instability frequency components (synchrotron sidebands), and to feed them back with the proper phase to create negative feedback. The paper describes the different building blocks of a new longitudinal damping system in the Fermilab Booster and the main design considerations. The system design has been completed. The prototype is currently being built and tested. First system integration with the Booster is expected in August 1991

  17. Commissioning experiences of the ALS booster synchrotron

    International Nuclear Information System (INIS)

    Installation of the ALS booster synchrotron proper was completed on April 30, 1991, and commissioning has just begun. Circulating beam around the booster was observed on the first day of operation, May 3, 1991. The beam was visible for about 400 turns. In this paper we describe the status and commissioning experience of the 1.5-GeV electron synchrotron accelerator. 14 refs., 2 figs., 4 tabs

  18. At PS170 (APPLE)

    CERN Multimedia

    1983-01-01

    APPLE stands for Antiproton-Proton to Pair of LEptons (an acronym of the ancestor experiment PAPLEP), the PS170 experiment setup at LEAR to study e+e-pair production in antiproton-proton annihilation by Padova-(CEN) Saclay- Torino Collaboration. It consisted of a liquid hydrogen target surrounded by several layers of proportional chambers in the vertical field of a C-magnet (this photo), a gas Cerenkov counter, wire chambers, hodoscopes, and an electromagnetic calorimeter (see photo 8302539X, 8302540X). See also photo 8301539X for the setup assembly at an early stage.

  19. Common control system for the CERN accelerators

    International Nuclear Information System (INIS)

    The PS and SPS Accelerator Control Systems are becoming obsolete and need urgent rejuvenation. After a control users forum, where users expressed their needs, two main Working Groups were set up, consisting of Control and Equipment Specialists and experienced Machine Operators. One Working Group studied the architecture and the front-end processing and the other a common approach to the application software needed to run the CERN accelerator complex. The paper presents the technical conclusion of their work and the policy to implement it, taking into account the necessity to operate both machines without interruption of the Physics Program. (author)

  20. Beyond iPS!

    Directory of Open Access Journals (Sweden)

    Editorial

    2012-01-01

    Full Text Available It’s undoubtedly a jubilant moment for scientists and clinicians working in the stem cell arena as Prof. Gurdon and Prof. Shinya Yamanaka have been chosen for the Nobel Prize in Physiology & Medicine this year. The mystery of cell biology is something unfathomable and probably the work of this duo as well as the other scientists, who have put their hands on in- vitro de-differentiation have opened our eyes to a new window or a new paradigm in cell biology. The iPS invention has brought a lot of hope in terms of potential direct benefits to treat several diseases, which have no definite options at the moment. But, we envisage that several spin-offs could come out of this invention and one very significant spin-off finding recently witnessed is the finding by Prof. Masaharu Seno and his team of researchers at the Okayama University, Japan (Chen L, et al. 2012, PLoS ONE 7(4:e33544.doi:10.1371/journal.pone.0033544. According to Prof. Seno, mouse iPS cells (miPS when cultured in the conditioned medium derived from cancer cell lines, differentiate into cancer stem cells (CSCs. While differentiating into CSCs, they do retain the potential to develop endothelial progenitor cells. Several questions arise here: 1.Are these miPS derived CSCs really pluripotent, even if the terminal differentiation destined to specific phenotypes? 2.Shouldn’t the Cancer Stem Cells be termed as cancer progenitor cells, as till date they are considered to be producing only cancer cells but not pluripotent to yield other types of normal tissues? The spin-offs could be infinite as the process of differentiation and de-differentiation happening due to trillions of signals and pathways, most still remaining not-so-well understood. A special mention should be made to Prof. Shinya Yamanaka as he has several sterling qualities to be a role-model for budding scientists. Apart from his passion for science, which made him shift his career from orthopedics to a cell biologist, his

  1. CERN: Digitally open, too

    CERN Multimedia

    Computer Security Team

    2013-01-01

    The Open Days are here!! From tomorrow onwards, we will be welcoming thousands of people to CERN. No barriers, no boundaries!   For decades, we have welcomed researchers and visitors from around the world to work at CERN, discuss physics research and attend our training sessions, lectures and conferences. This is how fundamental research should be conducted!!! But have you ever noticed how you are welcome at CERN in the digital world, too? Once you are affiliated and are registered with CERN, you receive a CERN computing account and e-mail address.  You can register your laptops, PCs and smartphones to use our (wireless) network, you can easily create your personal webpage, and profit from a vast disk space for file storage (AFS and DFS). CERN is indeed an Open Campus and not only during the Open Days. CERN is an Open Campus in the digital world. This digital Open Campus culture is exactly the reason why “computer security” has been dele...

  2. CERN in 2030

    CERN Multimedia

    Laëtitia Pedroso

    2011-01-01

    A competition will soon be launched to select the architect, urban planner or landscape designer to undertake the first phase of redevelopment of the parking area by the flagpoles, between Entrances A and B. This will be the first stage in a wider development project aimed at sprucing up the CERN site and enhancing its image. Work to create a pleasant and harmonious area at the CERN entrance will start in 2013 while preparatory work for other developments inside the CERN site has already begun…   CERN as it is today.  By 2030, CERN will be a greener place, much like a university campus. The arrival of the tramway on 30 April will be an opportunity to forge ahead with the urban plan aimed at rejuvenating the CERN site and redefining how it is organised. "Nearly sixty years after CERN's first buildings went up, this plan will help transform the site and give it a welcoming, friendly face, a bit like a university campus," explains Thierry Chanard, urban plannin...

  3. The 1956 CERN Symposium

    CERN Document Server

    Jarlskog, Cecilia

    2014-01-01

    CERN, currently the largest organization in the world for particle physics, was founded in 1954. Originally located in Meyrin, at the outskirts of the city of Geneva in Switzerland, it has with time extended into neighboring France. The Theoretical Study Division of CERN, however, was created already in 1952, i.e., before the official inauguration of CERN. It was situated in Copenhagen. Christian Møller [1] was appointed (part-time) as the Director and there were two full time senior staff members, Gunnar Källén and Ben R. Mottelson. While constructing buildings and accelerators were in progress, an international conference was organized by CERN in the city of Geneva. This “CERN Symposium on High Energy Accelerators and Pion Physics”, 11–23 June 1956, attracted about 250 participants from outside CERN, among them at least 18 Nobel Laureates or future Laureates. Unfortunately, the participants from CERN are not listed in the Proceedings [2]. The conference focused on measuring devices such as bubbl...

  4. CERN honours its guides

    CERN Multimedia

    2004-01-01

    At the end of January, CERN's guides were rewarded for their devotion to the Laboratory. They have a passion for their work, know CERN inside-out and for 40 years have shown people of all ages and nationalities, from all walks of life, around the Laboratory. Who are they? Why, the CERN guides, of course. On 27 January, ten of CERN's 180 guides received special honours for their impressive number of guided tours in 2003. Presenting the awards in the Microcosm hall, CERN's Director-General Robert Aymar congratulated the winners on the key role they play with respect to the general public. "CERN would be nothing without you who show them its activities," he stressed. CERN's Director-General Robert Aymar congratulates Alberto Ribon for his tally of over 40 visits in the course of 2003.One of the prizes was the book «The Particle Odyssey». Here the book's co-author Christine Sutton dedicates it for Sijin Qian. Tzanko Spassoff (PH) and retired staff members Klaus Batzner and Antonio Francano wo...

  5. La Hollande au CERN

    CERN Document Server

    CERN Press Office. Geneva

    1995-01-01

    On 17 October the third industrial exhibition, "Holland at CERN" was officially opened by Dr R.J. van Duinen, President of the Dutch Organisation for Scientific Research (NWO). In his opening speech he encouraged scientific organisations such as CERN to take full advantage of industry's ability to design and invent new processes and equipment stressing that the purpose of the "Holland at CERN" exhibition was not simply to sell equipment, but to establish an efficient cross-fertilisation between fundamental science and industry.

  6. CERN 50th Anniversary : CERN's 50th anniversary celebrations drew to a close with a ceremony at Geneva University's Institut de Physique.

    CERN Multimedia

    Maximilien Brice

    2004-01-01

    For it was here, on the banks of the River Arve, that CERN's first staff members, from the PS Magnets Group, came to work in October 1953. A commemorative plaque was inaugurated by Robert Aymar, CERN's Director-General, Charles Beer, State Councillor for the Canton of Geneva responsible for the Department of Public Education, and André Hurst, Rector of the University (Picture 01)

  7. CERN achievements in relativistic heavy ion collisions

    Directory of Open Access Journals (Sweden)

    Bruno Giuseppe Eugenio

    2015-01-01

    Full Text Available Twenty years after a Letter of Intent by the GSI and LBL groups for the “Study of particle production and target fragmentation in central 20Ne on Pb reactions, at 12 GeV per nucleon energy of the CERN PS external beam" [1], based on the results found by the NA45/CERES, NA49, NA50, and WA97/NA57 experiments at the SPS, CERN announced compelling evidence for the formation of a new state of matter in heavyion collisions at CERN-SPS energies [2]. Some of the experiments were indeed the 2nd or 3rd generation successors of the apparatuses originally proposed by the GSI-LBL collaboration. Actually, the CERN ion program initiated at the SPS with the acceleration of oxygen ions at 60 and 200 GeV/nucleon only in 1986, and continued with sulphur ions at 200 GeV/nucleon up to 1993. The rest is history: lead-ion beams at 160 GeV/nucleon became available at the SPS in 1994; the LHC accelerated and collided lead beams at a center of mass energy per nucleon pair √sNN = 2.76 TeV in 2010. Heavy ion physics is definitely in the future program of CERN: ALICE will operate a major upgrade of its detectors during the second long shutdown of the LHC, in 2018-2019, and the associated physics program will span the third and fourth LHC runs, till late 2020s.

  8. CERN Front-End Software Architecture for Accelerator Controls

    CERN Document Server

    Arruat, M; Guerrero, A; Jackson, S; Ludwig, M; Nougaret, J L

    2003-01-01

    To overcome the current diversity in AB front end equipment software and pave the way towards LHC for efficient development, diagnostic and maintenance in this area, the CERN Accelerator Controls group launched in April 2003 a project to develop the new CERN accelerator standard infrastructure for front end software. This development is based on the infrastructure recently born to handle the SPS beam measurement systems and extends it to handle the PS and SPS multi-cycling schemes, the future requirements needed for LHC as well as providing a good backward compatibility with the existing infrastructures. The project, approach and first deliverables are presented.

  9. Star spotting at CERN

    CERN Multimedia

    2008-01-01

    This June, two American celebrities (and physics enthusiasts!) came to CERN. Brian Cox gave Mike Einziger (right), lead guitarist with the rock band Incubus, the star treatment in the ATLAS cavern. Jesse Dylan embraces the spirit of ATLAS! Mike Einziger, lead guitarist with the rock band Incubus, visited CERN on Friday 13 June between concerts in Finland and England. Einziger, a lifelong science enthusiast descended into the ATLAS and CMS caverns and visited the SM18 test magnet facility during his brief tour of CERN. Einziger learned about the LHC through watching online lectures from University of Manchester and ATLAS physicist Brian Cox, and was thrilled to have the chance to see the detectors in person. The musician has created an orchestral piece, inspired in part by the work being done at CERN for the LHC, which will have its debut in Los Angeles on 23 August. Just over a week earlier, Jesse Dylan, Hollywood film director a...

  10. Ex / Noise / CERN / Deerhoof

    CERN Multimedia

    CERN, SM18,

    2015-01-01

    Indie rockers Deerhoof battled with the noise of CERN’s magnet test facilities on 30 August 2015. The band visited CERN at the invitation of ATLAS physicist James Beacham, whose pilot project Ex/Noise/CERN collides experimental music artists with experimental particle physics. Credits: -Producer- CERN Video Productions James Beacham François Briard -Director- Noemi Caraban -Camera- Yann Krajewski Piotr Traczyk Noemi Caraban -Crane operator- Antonio Henrique Jorge-Costa -Live recording at CERN- Mixing at Rec studio/Geneva By Serge Morattel -Infography- Daniel Dominguez Noemi Caraban -Deerhoof- John Dieterich Satomi Matsuzaki Ed Rodriguez Greg Saunier w/Deron Pulley SPECIAL THANKS TO: Michal Strychalski Marta Bajko Maryline Charrondiere Luca Bottura Christian Giloux Rodrigue Faes Mariane Catallon Georgina Hobgen Hailey Reissman Marine Bass

  11. Britain exhibition at CERN

    CERN Multimedia

    Bertin; CERN PhotoLab

    1969-01-01

    The United Kingdom inaugurated the Industrial Exhibitions in 1968, and it wasn't till 1971 that other countries staged exhibitions at CERN. This photo was taken in 1969, at the second British exhibition, where 16 companies were present.

  12. Indian President visits CERN

    CERN Multimedia

    Katarina Anthony

    2011-01-01

    On 1 October, her Excellency Mrs Pratibha Devisingh Patil, President of India, picked CERN as the first stop on her official state visit to Switzerland. Accompanied by a host of Indian journalists, a security team, and a group of presidential delegates, the president left quite an impression when she visited CERN’s Point 2!   Upon arrival, Pratibha Patil was greeted by CERN Director General Rolf Heuer, as well as senior Indian scientists working at CERN, and various department directors. After a quick overview of the Organization, Rolf Heuer and the President addressed India’s future collaboration with CERN. India is currently an Observer State of the Organization, and is considering becoming an Associate Member State. A short stop in LHC operations gave Steve Myers and the Accelerator team the opportunity to take the President on a tour through the LHC tunnel. From there, ALICE’s Tapan Nayak and Spokesperson Paolo Giubellino took Pratibha Patil to the experiment&am...

  13. Open Hardware at CERN

    CERN Multimedia

    CERN Knowledge Transfer Group

    2015-01-01

    CERN is actively making its knowledge and technology available for the benefit of society and does so through a variety of different mechanisms. Open hardware has in recent years established itself as a very effective way for CERN to make electronics designs and in particular printed circuit board layouts, accessible to anyone, while also facilitating collaboration and design re-use. It is creating an impact on many levels, from companies producing and selling products based on hardware designed at CERN, to new projects being released under the CERN Open Hardware Licence. Today the open hardware community includes large research institutes, universities, individual enthusiasts and companies. Many of the companies are actively involved in the entire process from design to production, delivering services and consultancy and even making their own products available under open licences.

  14. CERN stationery rejuvenated

    CERN Multimedia

    Anaïs Schaeffer

    2013-01-01

    With the introduction of CERN’s new graphic charter, our complete range of official communications stationery has been redesigned. Discover the newly harmonised and standardised range of CERN stationery.   As the Director-General announced in Bulletin 41-42/2012, a new graphic charter is now in force at CERN. The graphics team has taken this opportunity to redesign all the official CERN stationery, such as business cards, correspondence cards, letterheads, envelopes and file holders, all of which will now boast the same, unified format. In keeping with CERN’s new graphic charter, even the business cards have had a makeover: of a better quality than their predecessors, they now elegantly display the CERN colours (namely the familiar Pantone 286 blue). These new cards, which all follow a standardised format, help to project a standardised corporate image of the Organization. Order them online now! As the Director-General highlighted, “it's increasingly imp...

  15. CERN meets Facebook

    CERN Multimedia

    2012-01-01

    Social networking sites like LinkedIn, MySpace, Google+ and Facebook are on the rise. In particular, the life of youngsters revolves more and more around these sites as they facilitate communication, networking and the exchange of niceties. Who does not today already have an account registered with one of them? A Facebook profile can contain photos, listings of hobbies, job information, preferences…   The on-going effort to externalise some of CERN's computing resources continues, and in order to promote a unified interface for personal information, CERN has decided to establish a partnership with Facebook starting on 1stApril. "CERN is a public and trustworthy international organisation, and as such, our staff and users have nothing to hide from the general public," said Alexi Spiner (IT), project leader responsible for this migration: * The computer profiles of all CERN users will be integrated into the Facebook portal; * In addition, we will also ...

  16. Rejuvenating CERN's Accelerators

    CERN Multimedia

    2004-01-01

    In the coming years and especially in 2005, CERN's accelerators are going to receive an extensive renovation programme to ensure they will perform reliably and effectively when the LHC comes into service.

  17. CERN Science and Technology

    OpenAIRE

    Di Meglio, Alberto

    2015-01-01

    A high-level overview of the relationship between science and technology at CERN and the impact of technology on research with a focus on ICT technologies. Presented as a 12-minute "power-talk" at CIOCity 2015, Brussels

  18. PACMAN at CERN

    CERN Multimedia

    2015-01-01

    PACMAN Particle Accelerator Components Metrology and Alignment to the Nanometre scale. PACMAN is an Innovative Doctoral Program Network, offering training to 10 Early Stage Researchers hosted by CERN thanks to The European Commission FP7 Marie Curie Actions.

  19. YOUR LIFE@CERN

    CERN Multimedia

    Guinot, Genevieve

    2016-01-01

    Balancing work and home life, getting support for your family and thriving in an inclusive and respectful workplace: find out more about the support structures in place to enhance your working life@CERN!

  20. CERN at ESOF 2016

    CERN Multimedia

    James Gillies

    2016-01-01

    CERN had a major presence at the ESOF2016 conference this week, largely in collaboration with our EIROforum partners. A keynote session featuring the CERN Director-General, Fabiola Gianotti, EMBL Director-General, Iain Mattaj, and ESO Director for Science, Rob Ivison, and chaired by BBC science correspondent Pallab Ghosh debated the value of European collaboration in science.   The focal point of EIROforum’s presence was a stand highlighting the societal benefit of EIROforum science. (Image: Matt Wilkinson Photography/ ESOF 2016) A double session covered the science of the EIROs, with ATLAS physicist Claire Lee representing CERN, and there was a session exploring the ways that the EIROforum organisations create business value locally, with the leader of the Knowledge Transfer group, Giovanni Anelli, representing CERN. The focal point of EIROforum’s presence was a stand highlighting the societal benefit of EIROforum science. Side events linked to the stand discussed subjects su...

  1. La nascita del CERN

    CERN Multimedia

    Fidecaro, Giuseppe

    2004-01-01

    CERN was born on 30th September 1954, after the ratification of the Convention by the Member States. After the war, there was a need for international collaboration to rebuild the half-destroyed Europe (2 pages)

  2. Iran approaches CERN

    CERN Multimedia

    2002-01-01

    Members of Parliament from the Islamic Republic of Iran visit SM18. From left to right : Ali Mojtahed-Shabestari, Deputy Ambassador of the Islamic Republic of Iran in Geneva, Diether Blechschmidt, from CERN, Abdol-Rahim Baharvand and Hossain Amiri, from the Iranian Parliament, Norbert Siegel, from CERN, Hossain Afarideh, Rasool Seddighi and Ahmad Shirzad from the Iranian Parliament. Five members of the Parliament of the Islamic Republic of Iran visited CERN for three days at the beginning of May. All of them have PhD's in Physics, as well as holding their job in politics. They are involved in legislation for science, research and education funding in Iran. Apart from their interest in CERN in general, they were especially attracted to the CMS detector, since an Iranian contribution to the LHC is now starting through a collaboration with the Institute for Studies in Theoretical Physics and Mathematics in Tehran.

  3. CERN 1981-8

    International Nuclear Information System (INIS)

    At the CERN Council Meeting in December, the Director General traditionally gives an end-of-year review. This time the presentation took on added significance as it marked the end of the eight-year mandate of Herwig Schopper, who handed over on 1 January to Carlo Rubbia. Looking back over those eight years, Schopper pointed out several major trends. The dramatic growth in CERN 'users' (the scientists coming to the Laboratory to do their research) has led to CERN's research programme becoming really worldwide. The attrition of having to operate an expanding Laboratory under a constant budget has produced in its wake a healthy increase in the efficiency of CERN's big machines and experimental facilities

  4. CERN recognises LHC suppliers

    CERN Multimedia

    2002-01-01

    CERN has just presented the first awards recognising LHC suppliers. The Russian institute BINP, the Belgian firm Cockerill-Sambre and the US company Wah-Chang are the recipients of the first 'Golden Hadrons'.

  5. CERN scientists predict supernova

    CERN Multimedia

    2003-01-01

    "A team of theoretical physicists working at CERN and the Technion Institute of Technology in Israel has developed a theory to account for the mysterious gamma ray bursts that come from the depths of the Universe" (1/2 page).

  6. CERN confirms LHC schedule

    CERN Multimedia

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  7. Safety at CERN

    CERN Multimedia

    2009-01-01

    Safety is an integral part of our working lives, and should be in our minds whatever job we do at CERN. Ultimately, safety is the responsibility of the Director General – your safety is my concern. That’s why I have this week appointed a new Safety Policy Committee (SAPOCO) that reflects the new Organizational structure of CERN. CERN’s Staff Rules and Regulations clearly lay out in chapter 3 the scope of safety at CERN as well as my responsibilities and yours in safety matters. At CERN, safety is considered in the broadest sense, encompassing occupational Health and Safety, environmental protection, and the safety of equipment and installations. It is my responsibility to put appropriate measures in place to ensure that these conditions are met. And it is the responsibility of us all to ensure that we are fully conversant with safety provisions applicable in our areas of work and that we comply with them. The appointment of a n...

  8. Fusion Revisits CERN

    CERN Multimedia

    2001-01-01

    It's going to be a hot summer at CERN. At least in the Main Building, where from 13 July to 20 August an exhibition is being hosted on nuclear fusion, the energy of the Stars. Nuclear fusion is the engine driving the stars but also a potential source of energy for mankind. The exhibition shows the different nuclear fusion techniques and research carried out on the subject in Europe. Inaugurated at CERN in 1993, following collaboration between Lausanne's CRPP-EPFL and CERN, with input from Alessandro Pascolini of Italy's INFN, this exhibition has travelled round Europe before being revamped and returning to CERN. 'Fusion, Energy of the Stars', from 13 July onwards, Main Building

  9. Upgrade of the CERN PSB/CPS Fast Intensity Measurements

    CERN Document Server

    Monera Martinez, A; Belohrad, D; Jensen, L; Soby, L; Kasprowicz, G

    2011-01-01

    The CERN Proton Synchrotron Booster (PSB) and Proton Synchrotron (CPS) complex fast intensity measurement is undergoing a major upgrade. The old analogue electronics no longer provides enough accuracy, resolution and versatility to perform accurate beam intensity measurements. It has also become less reliable due to the ageing equipment. A new measurement system - Transformer Integrator Card (TRIC) - replaces these obsolete acquisition systems. TRIC is a generic platform used to measure the intensity in different transfer lines at CERN. Five TRICs were installed during the year 2010 in order to evaluate their performance with different beam types, from the low intensity pilot (5×10 9 charges per bunch) to high intensity beams (1×10 13 charges per bunch). The aim of this article is to present the technical aspects of the new system and the different measurement scenarios. It discusses possible sources of measurement errors and presents some statistical data acquired during this period.

  10. POPS: the 60MW power converter for the PS accelerator: Control strategy and performances

    CERN Document Server

    Boattini, Fulvio; Skawinski, Gregory

    2015-01-01

    The main power supply of Proton-Synchrotron (PS) accelerator is one of the biggest at CERN. The old rotating machine system has been replaced with a new NPC based DC/DC power supply named POPS (Power system for PS main magnets) with capacitor banks as energy storage mean. POPS is in operation since February 2011. The operation of the PS accelerator requires a specific design of the control system with very high performance requirements in term of accuracy and precision. This paper describes the main lines of the control strategies analyzing the problems encountered and the solutions adopted. The performances of the converter are presented throughout the paper.

  11. CERN expositions permanentes

    CERN Document Server

    2016-01-01

    Explore by yourself the issues CERN's physicists are trying to solve: given that the entire universe is made of particles, where do they come from? Why do they behave in the way they do? Discover the massive apparatus used by physicists at CERN, like the LHC, and see how each part works. And if you have more time on site, follow the LHC circuit at ground level to understand in situ this giant machine. Enter our exhibitions. Welcome!

  12. Future Perspectives at CERN

    OpenAIRE

    Ellis, John

    2002-01-01

    Current and future experiments at CERN are reviewed,with emphasis on those relevant to astrophysics and cosmology. These include experiments related to nuclear astrophysics, matter-antimatter asymmetry, dark matter, axions, gravitational waves, cosmic rays, neutrino oscillations, inflation, neutron stars and the quark-gluon plasma. The centrepiece of CERN's future programme is the LHC, but some ideas for perspectives after the LHC are also presented.

  13. CERN: Making CLIC tick

    International Nuclear Information System (INIS)

    While the Large Hadron Collider (LHC) scheme for counter-rotating proton beams in a new superconducting ring to be built in CERN's existing 27-kilometre LEP tunnel is being pushed as the Laboratory's main construction project for the 1990s, research and development continues in parallel for an eventual complementary attack on new physics frontiers with CERN's Linear Collider - CLIC - firing TeV electron and positron beams at each other

  14. Cern Women's Club

    CERN Multimedia

    Cern Women's Club

    2014-01-01

      CERN WOMEN’S CLUB   Coffee Morning Tuesday 10th  June 2014, 12:30   Annual Club Lunch at the restaurant “Le Coq Rouge” in St-Genis-Pouilly Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://web.cern.ch/Club-WomensClub/

  15. Cern women's club

    CERN Document Server

    Club des cernoises

    2014-01-01

    CERN WOMEN’S CLUB Coffee Morning Tuesday 13th  May 2014, 9:30 Bldg 504,  (Restaurant No 2 – DSR) 1st Floor, Club Room 3   Annual General Meeting Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://cern.ch/Club-WomensClub/

  16. CERN, Accelerating Science

    CERN Multimedia

    De Melis, Cinzia

    2015-01-01

    What is the Universe made of? Where did it come from, where is it going and why does it behave the way it does? These are some of the questions that CERN set out to address when a small number of pioneering scientists created Europe’s first scientific international organization. Founded in 1954, in the aftermath of the Second World War, CERN is not only a first-class centre for fundamental research but also a pioneering adventure in international collaboration.

  17. CERN permanent exhibitions

    CERN Multimedia

    2016-01-01

    Explore by yourself the issues CERN's physicists are trying to solve: given that the entire universe is made of particles, where do they come from? Why do they behave in the way they do? Discover the massive apparatus used by physicists at CERN, like the LHC, and see how each part works. And if you have more time on site, follow the LHC circuit at ground level to understand in situ this giant machine. Enter our exhibitions. Welcome!

  18. The CERN's year

    International Nuclear Information System (INIS)

    CERN, the European organization for nuclear research, has just celebrated its fifty years of existence. Its first goal was to counterbalance the migration of physics scientists towards the USA by the creation of a physics laboratory gathering scientists from the different European countries. Today, the CERN's mission has changed and has overcome all the expectations of its founders. In 2008, it will become, with the LHC (Large Hadron Collider), the biggest particle accelerator in the world. The CERN employs about 3000 physicists, engineers, technicians and workers. There is also 6500 people from 80 different countries who use the CERN's facilities during the year. The CERN is controlled by 20 European member states and 6 observer countries, and 20 non-member countries participate to the programs in progress. The CERN's power comes from its international and cosmopolitan spirit. The whole most famous physicists of the world can work together for the progress of science and for a better understanding of matter, of its interactions and of our universe. Two Nobel prices of physics come from the CERN: C. Rubbia and S. Van der Meer in 1983 for the discovery of W+, W- and Z0 bosons, and G. Charpak for the development of particle detectors. One can foresee that the LHC will allow new scientific achievements, like for instance, during experiments for the quest of the famous Higgs boson. It is important also to mention that the CERN has been at the origin of several technological innovations in all technical and engineering domains in the framework of its fundamental physics researches. (J.S.)

  19. CERN: RICH dividends

    International Nuclear Information System (INIS)

    Back in 1985, when the hunt was on at CERN's proton-antiproton collider for as many W and Z particles as possible, an Athens/CERN/Uppsala/Wuppertal group had an unique chance to install a ring-imaging Cherenkov counter (RICH) in one of the twelve end-cap sectors of the big UA2 experiment and squeeze in a short run

  20. CERN Library | Agnes Chavez @ CERN | 3 May

    CERN Multimedia

    CERN Library

    2016-01-01

    Agnes Chavez is an artist and educator participating in a two-week research stay through the ATLAS Experiment at CERN.   Tuesday 3 May at 4 p.m. CERN Library (52 1-052) Artist/educator, Agnes Chavez will share video outcomes from Projecting Particles, an Art + Science + Education collaboration with ATLAS. The Sci-Art project combines the International Masterclass with Projection Art in a series of teen-led youth workshops and projection events. In this presentation Chavez will share her vision and describe the research and development behind the project, now in its third year.  For the Projecting pARTicles series of art installations she has formed an interdisciplinary team of programmers, artists, scientists and educators to investigate how we can create art and education interventions inspired by emerging particle physics theories. Chavez’s art experiments with data visualization, sound and projections to create participatory environments. She collaborates with programmers t...

  1. CREATIVE COLLISIONS: ARTS @CERN

    CERN Document Server

    CERN. Geneva

    2012-01-01

    In 2000, CERN hosted Signatures of the Invisible – one of the landmark initiatives in arts and science. In 2012, CERN is now initiating its own science/arts programme Collide@CERN in different arts disciplines. The first of these is in digital arts, and the international competition to find the winning artist is called the Prix Ars Electronica Collide@CERN. It was announced September 2011 at CERN’s first collaboration with an international arts festival – Ars Electronica in Linz. The competition attracted over 395 entries from 40 countries around the world. The winning artist, Julius Von Bismarck, will begin his two month residency here at CERN next month. Ariane Koek who leads on this initiative, discusses the residency programme, as well as the background about Art@CERN. History has shown that particle physics and the arts are great inspiration partners. The publication of the paper by Max Planck which gave birth to quantum mechanics as well as those by Einstein, heavily influenced some of the grea...

  2. CERN openlab Open Day

    CERN Multimedia

    Andrew Purcell

    2015-01-01

    CERN openlab is the unique public-private partnership between CERN and leading companies in the field of information and communication technology. The programme is now entering an exciting new phase and is expanding to include other public research organisations for the first time. A special event will be held at CERN to mark this occasion.   CERN openlab was created in 2001 and is now entering its fifth three-year phase (2015-2017). Its mission is to accelerate the development of cutting-edge solutions to be used by the scientific community to control the operations of complex machines and to analyse the vast amounts of data produced by physics experiments. During Run 2 of the LHC, it is expected that the CERN Data Centre will store more than 30 petabytes of data per year from the LHC experiments, which is equivalent to about 1.2 million Blu-ray discs, or 250 years of HD video. Testing in this demanding environment provides the companies collaborating in CERN openlab with valuable feedback o...

  3. CERN Relay Race

    CERN Multimedia

    Running Club

    2010-01-01

    This year’s CERN Relay Race will take place around the Meyrin site on Thursday 20th May at 12h00. This annual event is for teams of 6 runners covering distances of 1000m, 800m, 800m, 500m, 500m and 300m respectively. Teams may be entered in the Seniors, Veterans, Ladies, Mixed or Open categories. The registration fee is 10 CHF per runner, and each runner receives a souvenir prize. As usual, there will be a programme of entertainments from 12h in the arrival area, in front of the Restaurant no. 1. Drinks, food, CERN club information and music will be available for the pleasure of both runners and spectators. The race starts at 12h15, with results and prize giving at 13:15.   For details of the race, and of how to sign up a team, please visit: https://espace.cern.ch/Running-Club/CERN-Relay The event is organised by the CERN Running Club with the support of the CERN Staff Association.  

  4. CERN Pensioners Association

    CERN Multimedia

    The GAC Committee

    2004-01-01

    Open Day To all CERN retired staff As part of the celebrations organised for the 50th anniversary of CERN, an Open Day will be held on Saturday 16 October 2004. Anyone willing to act as a guide, either to help and inform visitors at the reception points or to guide groups of visitors, sharing your knowledge with them, is invited to fill in the attached form. A preparatory meeting will be arranged for those who left CERN some time ago and whose knowledge of the site may no longer be quite up-to-date. The Open Day organisers need your help, which will be very much appreciated. We hope that many pensioners will participate. People with internet access may enrol directly without coming to CERN, http://www.cern.ch/CERN50/openday The GAC Committee OPEN DAY : CALL FOR VOLUNTEERS 16th October 2004 So now you are excited about the Open Day, how can you participate? As you can imagine, for such a large number of activities, we need many volunteers. Please return the following form to Elena Battis...

  5. CERN In Focus

    CERN Multimedia

    CERN audiovisual service

    2008-01-01

    First edition 2008 of Cern in Focus. On behalf of the audiovisual team, a selection of the latest videos filmed at CERN. Every six weeks, we will bring you the latest in CERN's activities, from LHC start up to the Computing Grid, featuring the experiments and many other goings-on at CERN. The agenda of this first edition of CERN in Focus features the visit of the prime minister of Malta, Lawrence Gonzi... CMS and the final descent of the YE-1 end cap... The departure of UA1 magnets to Japan... The start up of sectors 4 and 5... And finally, in our sports round up... We'll talk about football. New in brief this month... The final bolt is in place : On 7th November, in the bowels of the LHC tunnel, CERN's Director General Robert Aymar tightened a gold-plated bolt for the last arc interconnection of sector 1-2. This symbolic gesture marks the completion of all the arc interconnections of the LHC. Last welding work: it was never going to be an easy task. On this day last year just one sector had been completed,...

  6. Beam lines from Linac 1 and Linac 2 to the Booster

    CERN Multimedia

    1978-01-01

    View against the direction of the beams. Both Linacs are behind the concrete wall at the back of the picture. The 50 MeV proton beam from Linac 1 enters the PS tunnel through the hole at left. The line from Linac 2, in the process of being installed, comes from the hole at right. The lines converge at a switching magnet (prominently in the foreground), which selects which of the 2 beams to send on to the Booster. See also 7802261 and further explanations there.

  7. Summary of Booster Development and Qualification Report

    Energy Technology Data Exchange (ETDEWEB)

    Francois, Elizabeth G. [Los Alamos National Laboratory; Harry, Herbert H. [Los Alamos National Laboratory; Hartline, Ernest L. [Los Alamos National Laboratory; Hooks, Daniel E. [Los Alamos National Laboratory; Johnson, Carl E. [Los Alamos National Laboratory; Morris, John S. [Los Alamos National Laboratory; Novak, Alan M. [Los Alamos National Laboratory; Ramos, Kyle J. [Los Alamos National Laboratory; Sanders, Victor E. [Los Alamos National Laboratory; Scovel, Christina A. [Los Alamos National Laboratory; Lorenz, Thomas [LLNL; Wright, Mark [AWE; Botcher, Tod [PANTEX; Marx, Erin [NSWC-IHDIV; Gibson, Kevin [NSWC-IHDIV

    2012-06-21

    This report outlines booster development work done at Los Alamos National Laboratory from 2007 to present. The booster is a critical link in the initiation train of explosive assemblies, from complex devices like nuclear weapons to conventional munitions. The booster bridges the gap from a small, relatively sensitive detonator to an insensitive, but massive, main charge. The movement throughout the explosives development community is to use more and more insensitive explosive components. With that, more energy is needed out of the booster. It has to initiate reliably, promptly, powerfully and safely. This report is divided into four sections. The first provides a summary of a collaborative effort between LANL, LLNL, and AWE to identify candidate materials and uniformly develop a testing plan for new boosters. Important parameters and the tests required to measure them were defined. The nature of the collaboration and the specific goals of the participating partners has changed over time, but the booster development plan stands on its own merit as a complete description of the test protocol necessary to compare and qualify booster materials, and is discussed in its entirety in this report. The second section describes a project, which began in 2009 with the Department of Defense to develop replacement booster formulations for PBXN-7. Replacement of PBXN-7 was necessary because it contained Triaminotrinitrobenzene (TATB), which was becoming unavailable to the DoD and because it contained Cyclotrimethylenetrinitramine (RDX), which was sensitive and toxic. A LANL-developed explosive, Diaminoazoxyfurazan (DAAF), was an important candidate. This project required any replacement formulation be a drop-in replacement in existing munitions. This project was timely, in that it made use of the collaborative booster development project, and had the additional constraint of matching shock sensitivity. Additionally it needed to be a safety improvement, and a performance

  8. Spotlight on CERN : Recruitment and professions at CERN

    CERN Multimedia

    CERN video productions

    2010-01-01

    Spotlight on CERN No. 3 Recruitment and professions at CERN Welcome to the Globe of Science and Innovation for this third edition of "Spotlight on CERN". When one thinks about professions at CERN, what springs to mind? Physicists? Engineers? In fact, the smooth operation of the Organisation relies on a diversity of professions and this in itself, poses a real challenge in terms of recruitment in CERN member states. Today, to tell us more about this challenge and about CERN professions in general, we welcome James Purvis, Head of the HR Recruitment, Programmes and Monitoring group, and Lore Taillieu, leader of the group's Recruitment section.

  9. The AGS Booster Beam Position Monitor system

    International Nuclear Information System (INIS)

    To accelerate both protons and heavy ions, the AGS Booster requires a broadband (multi-octave) beam position monitoring system with a dynamic range spanning several orders of magnitude (2 x 1010 to 1.5 x 1013 particles per pulse). System requirements include the ability to acquire single turn trajectory and average orbit information with ± 0.1 mm resolution. The design goal of ± 0.5 mm corrected accuracy requires that the detectors have repeatable linear performance after periodic bakeout at 300 degree C. The system design and capabilities of the Booster Beam Position Monitor will be described, and initial results presented. 7 refs., 5 figs

  10. Tests of the CERN Proton Linac Performance for LHC-Type Beams

    CERN Document Server

    Hill, C E; Scrivens, R; Vretenar, Maurizio; Feschenko, A V; Liou, A

    2000-01-01

    As the pre-injector of the LHC injector chain, the proton linac at CERN is required to provide a high-intensity (180mA) beam to the Proton Synchrotron Booster. The results of measurements at this intensity will be presented. Furthermore, the linac is now equipped with bunch shape monitors from INR, Moscow, which have allowed the comparison of the Alvarez tank RF settings with simulations.

  11. Tests of the CERN proton linac performance for LHC-type beams

    CERN Document Server

    Feschenko, A V; Lombardi, A M; Liou, A; Scrivens, R; Vretenar, Maurizio

    2000-01-01

    As the pre-injector of the LHC injector chain, the proton linac at CERN is required to provide a high-intensity (180mA) beam to the Proton Synchrotron Booster. The results of measurements at this intensity will be presented. Furthermore, the linac is now equipped with bunch shape monitors from INR, Moscow, which have allowed the comparison of the Alvarez tank RF settings with simulations.

  12. Experiments at CERN in 1985

    International Nuclear Information System (INIS)

    This book is a compilation of the current experimental program at CERN. The experiments listed are being performed at one of the following machines: the Super Proton Synchrotron (SPS), the Proton Synchrotron (PS) and the Synchro-Cyclotron (SC). The four experiments to be done by means of the Large Electron Positron machine (LEP) are also listed. The schematic layouts of beams and experiments at the various machines are given in the beginning of the report. The experiment goals and methods are briefly described and a schematic layout of the apparatus is included. Lists of participants and their institutions are also given. The status of the experiments (preparation, data-taking, completed) corresponds to the situation as of 1st November, 1985. ''Completed'' means only that data-taking is finished, not necessarily the analysis of the results; this status is kept for two years and then the experiment is removed from the catalogue. A complete list of all experiments published in this book since 1975 is given at the end of the catalogue. (orig./HSI)

  13. Experiments at CERN in 1988

    International Nuclear Information System (INIS)

    This book is a compilation of the current experimental programme at CERN. The experiments listed are being performed at one of the following machines: The Super Proton Synchrotron (SPS), the Proton Synchrotron (PS) and the Synchro Cyclotron (SC). The four experiments planned for the Large Electron Positron machine (LEP) are also listed. The schematic layouts of beams and experimental areas at the different machines appear at the beginning of the report. The experiments are briefly described and a schematic layout of each apparatus is included together with lists of participants and institutions. The status of the experiments (preparation/data-taking/completed) corresponds to the situation at the end of 1988. The 'completed' status means that data-taking is finished, not necessarily the analysis of the results; this status is kept for two years and then the experiment is removed from the catalogue. A complete list of all the experiments published in these books since 1974 is given at the end. (orig./HSI)

  14. Beam tests on a proton linac booster for hadron therapy

    CERN Document Server

    De Martinis, C; Berra, P; Birattari, C; Calabretta, L; Crandall, K; Giove, D; Masullo, M R; Mauri, M; Rosso, E; Rovelli, A; Serafini, L; Szeless, Balázs; Toet, D Z; Vaccaro, Vittorio G; Weiss, M; Zennaro, R

    2002-01-01

    LIBO is a 3 GHz modular side-coupled proton linac booster designed to deliver beam energies up to 200 MeV, as required for the therapy of deep seated tumours. The injected beam of 50 to 70 MeV is produced by a cyclotron like those in several hospitals and research institutes. A full-scale prototype of the first module with an input/output energy of 62/74 MeV, respectively, was designed and built in 1999 and 2000. Full power RF tests were carried out successfully at CERN using a test facility at LIL at the end of the year 2000. In order to prove the feasibility of the acceleration process, an experimental setup with this module was installed at the INFN Laboratorio Nazionale del Sud (LNS) in Catania during 2001. The superconducting cyclotron provided the 62 MeV test beam. A compact solid-state RF modulator with a 4 MW klystron, made available by IBA-Scanditronix, was put into operation to power the linac. In this paper the main features of the accelerator are reviewed and the experimental results obtained duri...

  15. High Intensity Beam Issues in the CERN Proton Synchrotron

    CERN Document Server

    Aumon, Sandra; Rivkin, Leonid

    This PhD work is about limitations of high intensity proton beams observed in the CERN Proton Synchrotron (PS) and, in particular, about issues at injection and transition energies. With its 53 years, the CERN PS would have to operate beyond the limit of its performance to match the future requirements. Beam instabilities driven by transverse impedance and aperture restrictions are important issues for the operation and for the High-Luminosity LHC upgrade which foresees an intensity increase delivered by the injectors. The main subject of the thesis concerns the study of a fast transverse instability occurring at transition energy. The proton beams crossing this energy range are particularly sensitive to wake forces because of the slow synchrotron motion. This instability can cause a strong vertical emittance blow-up and severe losses in less than a synchrotron period. Experimental observations show that the particles at the peak density of the beam longitudinal distribution oscillate in the vertical plane du...

  16. PS: 10$^{13}$ ppp

    CERN Multimedia

    1975-01-01

    An intensity of 10$^{13}$ protons per pulse was reached in the proton synchrotron (PS) in a test run held on 10 December. This test was a repeat of the one held on 7 November (see December COURIER, p. 423), finishing the year with a new record and achieving the required intensity set out in the PS improvement programme.

  17. A note on fuzzy PS-ideals in PS-algebra and its level subsets

    OpenAIRE

    Priya Thirugapillai; Rama Chandran

    2014-01-01

    In this paper, a new notion, named fuzzification of PS – Algebra, which is a generalization of BCK/BCI/TM/BH/Q/d/KU-algebras, is introduced, along with PS-ideal and we have discussed some of their properties in detail. Keywords: PS-Algebra, PS-ideal, Fuzzy PS-Ideal, Level Subsets, PS-Subalgebra and Fuzzy PS-Subalgebra.

  18. CERN Relay Race

    CERN Document Server

    2009-01-01

    The CERN relay race, now in its 39th year, is already a well-known tradition, but this year the organizers say the event will have even more of a festival feeling. Just off the starting line of the CERN relay race.For the past few years, spectators and runners at the CERN relay race have been able to enjoy a beer while listening to music from the CERN music and jazz clubs. But this year the organizers are aiming for "even more of a festival atmosphere". As David Nisbet, President of the CERN running club and organizer of the relay race, says: "Work is not just about getting your head down and doing the theory, it’s also about enjoying the company of your colleagues." This year, on top of music from the Santa Luis Band and the Canettes Blues Band, there will be demonstrations from the Aikido and softball clubs, a stretching session by the Fitness club, as well as various stalls and of course, the well-earned beer from AGLUP, the B...

  19. Inspired by CERN

    CERN Multimedia

    2004-01-01

    Art students inspired by CERN will be returning to show their work 9 to 16 October in Building 500, outside the Auditorium. Seventeen art students from around Europe visited CERN last January for a week of introductions to particle physics and astrophysics, and discussions with CERN scientists about their projects. A CERN scientist "adopted"each artist so they could ask questions during and after the visit. Now the seeds planted during their visit have come to fruition in a show using many media and exploring varied concepts, such as how people experience the online world, the sheer scale of CERN's equipment, and the abstractness of the entities scientists are looking for. "The work is so varied, people are going to love some pieces and detest others," says Andrew Charalambous, the project coordinator from University College London who is also curating the exhibition. "It's contemporary modern art, and that's sometimes difficult to take in." For more information on this thought-provoking show, see: htt...

  20. Spaceflight participant visits CERN!

    CERN Multimedia

    Kathryn Coldham

    2016-01-01

    On 15 July, CERN welcomed spaceflight participant Anousheh Ansari.   Anousheh Ansari’s grin stretches from ear to ear, during an intriguing conversation with Nobel laureate Samuel C.C. Ting at AMS POCC. (Image: Maximilien Brice/CERN) Iranian-American Anousheh Ansari was the first-ever female spaceflight participant, spending eight days on the International Space Station (ISS) in 2006. She now has a new addition to her list of extraordinary sights ­– the home of the world’s largest particle accelerator: CERN.   On 15 July, Anousheh Ansari came to CERN and, unsurprisingly, visited the control room of the experiment attached to the ISS: the AMS. At the AMS Payload Operations Control Centre (AMS POCC) on CERN’s Prévessin site, she met the Nobel laureate Samuel Ting, spokesperson of the AMS experiment. Ansari and her accompanying guests were thrilled to expand their knowledge about CERN, its research and its...

  1. CERN CAR STICKERS

    CERN Multimedia

    Service Accueil et Controle d'Accès; ST Division

    1999-01-01

    In accordance with Operational Circular n¡ 2, paragraph 21, CERN car stickers are to be renewed. The new stickers are now available and will be valid for a year.Youare therefore requested:either to obtain them from the distribution points for new stickers (see below); or to send us the application form below, duly completed, via the internal mail; or to complete the application form directly via the Web at the address: http://cern.ch/registration-stickers. Each vehicle has to carry a sticker and needs a separate application form.Vehicles bearing CERN diplomatic plates (CD07, 431K and CD series) do not need a sticker for access to the CERN areas.Thank you.List of distribution points:Registration Service (bldg 55 1st floor), open from 07h30 to 16h30. Building 33 (entrance hall), open from 08h00 to 18h00. Building 120 (ground floor), outside working hours.Name Surname CERN identification number Vehicle registration plates Country issuing the plates Vehicle ma...

  2. Radiography at CERN

    CERN Multimedia

    HSE Unit

    2014-01-01

    What is industrial radiography? It is a non-destructive method with a wide variety of applications, such as inspecting the quality of a weld. It uses high-energy radioactive sources or an X-ray generator.   Is this inspection technique used at CERN? Yes, it is widely used at CERN by the EN-MME Group, which outsources the work to one or more companies, depending on the workload. Is it possible to carry out radiography anywhere at CERN? Yes, it is possible to carry out radiography in any building/accelerator/experiment area at CERN (including in areas which are not normally subject to radiological hazards). When is radiography carried out? It normally takes place outside of working hours (7 p.m. to 6 a.m.). How will I know if radiography is taking place in my building? If this activity is planned in a CERN building, notices will be affixed to all of its main entrance doors at least 24 hours in advance. What are the risks? There is a risk of exposure to very high levels of radiation, dep...

  3. Apprenticeship at CERN

    CERN Multimedia

    Staff Association

    2016-01-01

    In 1961, based on the finding that the evolution of the labour market created a growing need for qualified staff, a first agreement between the Republic and Canton of Geneva and CERN was signed. One of the objectives of this agreement was the vocational training of young electronics and physics laboratory technicians. CERN, an important stakeholder in the local economy, highlighted with this agreement its willingness to participate in the local social and economic development. The first apprentice arrived at CERN in 1965. In 1971, the apprenticeship centre was created; it now hosts over twenty apprentices in total and welcomes about six new apprentices each year. These apprenticeships are for young people aged between 15 and 21 years, coming from one of the CERN Member States, and having completed their mandatory education, e.g. 11th grade in Switzerland or 3ème in France. The training is divided between working time at CERN and one or two days per week at school (CFPT in Geneva for electronics or ...

  4. CERN television news

    CERN Document Server

    2002-01-01

    CERN events brought right to your desktop by the new video bulletin.   CERN now has its very own news broadcast , or rather 'webcast', with a host of special reports and even a star presenter. From today onwards, just go to the Bulletin's web page, click on the 'video news' link and sit back and enjoy the latest news about CERN, presented in images by Wendy Korda. The ten-minute newscast in both French and English, the Organization's two official languages, presents interviews, pictures of experiments and computer-generated graphics, bringing you right up to date with some of the Laboratory's latest stories. The show concludes with a selection of the best snapshots taken by the CERN Photo Lab. So every one or two months CERN's Audio-Video Service (ETT/DH) will be putting together a video news report that you can watch on your own desktop computer. Daniel Boileau, Patrick Gilbert de Vautibault and Jacques Fichet, the Service's three technicians, came up with the idea of producing this regular feat...

  5. EU Commissioner visits CERN

    CERN Multimedia

    2005-01-01

    European Commissioner Viviane Reding in front of one of the computers showing how the Grid works and, from left to right, Robert Aymar, CERN's Director-General, Wolfgang von Rüden, Head of the Information Technology Department, and Bob Jones, the newly appointed director of the EGEE project since 1st November. Viviane Reding, European Commissioner for Information Society and Media, visited CERN on 28 October. Accompanied throughout by CERN's Director-General, Robert Aymar, and the Head of the Information Technology Department, Wolfgang von Rüden, the Commissioner visited the ATLAS cavern before going on to the Information Technology Department, where she was given a complete overview of CERN's activities in the strategic field of Grid computing. Viviane Reding's visit coincided with the end of the EGEE (Enabling Grids for E-sciencE) conference, which took place in Pisa in Italy. Co-ordinated by CERN and funded by the European Commission, the EGEE project aims to set up a worldwide grid infrastructure for sc...

  6. Lectures for CERN pensioners

    CERN Multimedia

    SC Unit

    2008-01-01

    The CERN Medical Service and the Pensioners Association are pleased to invite CERN pensioners to a series of lectures given by professors and specialists from the Teaching Hospitals and the Faculty of Medicine of the University of Geneva on the following topic: PROMOTION OF OPTIMUM BRAIN AGEING The lectures will take place in the Main CERN Auditorium (Building 60) from 2.30 p.m. to 4.30 p.m. on the following dates: Wednesday 12 November 2008: Assessing the extent of brain ageing Dr Dina ZEKRY Friday 12 December 2008: Can memory decline be prevented? Pr Jean-Pierre MICHEL Thursday 15 January 2009: Diagnosing and treating Alzheimer’s disease Pr Gabriel GOLD Wednesday 25 February 2009: What is the brain reserve? Speaker’s name to be announced at a later date The lectures will be given in French, with transparencies in English, and will be followed by a wide-ranging debate with the participants. CERN Medical Service - Pensioners Association - CERN-ESO (GAC-EPA)

  7. CERN Phonebook evolution

    CERN Multimedia

    Sébastien Dellabella

    2012-01-01

    Consolidating phonebooks at CERN We have had many phonebooks in the past, Xwho (now decommissioned), the NICE phonebook on Windows PCs, and more recently the web site people.cern.ch. However, diversity doesn’t always equate to improved efficiency or quality. So in order to reduce the maintenance effort and to improve the user experience, we have consolidated these various phonebooks into a single web application: phonebook.cern.ch Motivations for change The NICE Phonebook was introduced in the year 2000 when Windows 95 was the major desktop platform. Since then, a lot has changed not only in technology and the desktop landscape but also in the variety of devices used to access the data (notably smartphones and tablets). Updating the NICE phonebook is slow. Once the master database is modified it can take up to two days for the data to propagate to the application. Thus, we are now planning the retirement of the NICE phonebook application. The new Phonebook.cern.ch The new phonebook.cern.ch...

  8. The proposed CERN Proton-Synchrotron upgrade program

    CERN Document Server

    Gilardoni, SS; Bartmann, W; Bartolome, S; Berrig, O; Bertone, C; Blas, A; Bodart, D; Borburgh, J; Brown, R; Butterworth, A; Buzio, M; Carli, C; Chiggiato, P; Damerau, H; Dobers, T; Folch, R; Garoby, R; Goddard, B; Gourber-Pace, M; Hancock, S; Hourican, M; Le Roux, P; Lopez Hernandez, L; Masi, A; Metral, G; Metral, E; Muttoni, Y; Nonis, M; Pierlot, J; Pittet, S; Rossi, C; Ruehl, I; Rumolo, G; Sermeus, L; Steerenberg, R; Widorski, M

    2011-01-01

    In the framework of the High-Luminosity LHC project, the CERN Proton Synchrotron (PS) would require a major upgrade to match the future beam parameters requested as pre-injector of the collider. The different beam dynamics issues, from space-charge limitations to longitudinal instabilities are discussed, as well as the proposed technical solutions to overcome them, covering the increase of the injection energy to RF related improvements.

  9. Results from the 2009 beam commissioning of the CERN multi-turn extraction

    CERN Document Server

    Benedetto, E; Bohl, T; Cettour Cave, S; Cornelis, K; Cotte, D; Damerau, H; Delrieux, M; Fleuret, J; Fowler, T; Follin, F; Franchi, A; Freyermuth, P; Genoud, H; Gilardoni, S; Giovannozzi, M; Hancock, S; Hans, O; Le Borgne, Y; Manglunki, D; Matli, E; Métral, E; Métral, G; Newman, M; Pereira, L; Peters, F; Riva, Y; Roncarolo, F; Sermeus, L; Steerenberg, R; Vandorpe, B; Wenninger, J

    2010-01-01

    Following the analysis of the results obtained during the first year of beam commissioning of the CERN multiturn extraction, a number of changes have been introduced in the beam manipulations performed in the CERN Proton Synchrotron. This includes a different control of the linear chromaticity, the setting of the nonlinear magnets used to split the beam, and the longitudinal structure in the PS. The results obtained during the 2009 run are presented and discussed in detail, including the beam performance in both the PS and the SPS.

  10. Dalai Lama at CERN

    International Nuclear Information System (INIS)

    On 30 August CERN turned aside from its usual day-to-day preoccupations when Director-General Herwig Schopper played host to the Dalai Lama of Tibet and his entourage during the holy man's 1983 visit to Europe. In welcoming his visitor, Professor Schopper stressed the role of particle physics in helping to understand man's place in the cosmos, and how the Dalai Lama's interest would further the interrelation of science, philosophy and religion. The Dalai Lama visited the UA 1 experiment (rolled back into its 'garage' during the present fixed target operations at CERN) and the large installations for the neutrino experiments in the West Area of the SPS machine. There was an intriguing exchange of views with CERN theorists, who described how science has continually modified our view of the world around us

  11. Safety alarms at CERN

    CERN Document Server

    Ninin, P; Henny, L

    1998-01-01

    In order to operate the CERN accelerators complex safely, the acquisition, transport and management of safety alarms is of crucial importance. The French regulatory authority [Direction de Sûreté des Installations Nucléaires de Base (INB)] defines them as Level 3 alarms; they represent as such a danger for the life and require an immediate intervention of the Fire Brigade. Safety alarms are generated by fire and flammable gas detection systems, electrical emergency stops, and other safety related systems. Level 3 alarms are transmitted for reliability reasons to their operation centre: the CERN Safety Control Room (SCR) using two different media: the hard-wired network and a computer based system. The hard-wired networks are connected to local panels summarizing in 34 security areas the overall CERN geography. The computer based system offers data management facilities such as alarm acquisition, distribution, archiving and information correlation. The Level 3 alarms system is in constant evolution in order...

  12. CERN welcomes European science

    CERN Multimedia

    2002-01-01

    On 3 and 4 October CERN will host a special workshop for Marie Curie fellows. This programme is a key plank in the EU's strategy for creating a European research area.     With thousands of scientists from all over the continent working together, CERN is already an exemplary European science showcase. On 3 and 4 October, the Laboratory will contribute further to unifying all European science by hosting a special workshop for EU-funded Marie Curie fellows. This scheme gives young researchers from around the continent the mobility to go to wherever Europe's best facilities in their chosen field happen to be. The event that will take place at CERN, entitled 'Special workshop of Marie Curie Fellows on research and training in physics and technology', organised together with the European Commission, is a continuation of a series of workshops with the aim, among others, of promoting young researchers, supporting their training and mobility, and facilitating the interdisciplinary dissemination of knowledge. Dur...

  13. CERN UN Roundtable

    CERN Document Server

    CERN. Geneva; Del Rosso, Antonella; Gillies, James

    2014-01-01

    In the spirit of strengthening links and sharing best practices among the two Organizations, UNOG and CERN will be jointly organizing a round table discussion on the issue of “The challenge of communicating science and technology to the world: issues and solutions”. It is hoped that the discussions can highlight the experience of various organizations and institutions in their efforts to communicate and inform in several languages on topics – science and technology – that are often perceived as distant and arduous by the layman. ==>> Please note that registrations are now closed. It is not necessary to register for this event if you plan to watch it live on http://webcast.cern.ch. Send your questions to the speakers by email to: question@cern.ch

  14. CERN's new safety policy

    CERN Multimedia

    2014-01-01

    The documents below, published on 29 September 2014 on the HSE website, together replace the document SAPOCO 42 as well as Safety Codes A1, A5, A9, A10, which are no longer in force. As from the publication date of these documents any reference made to the document SAPOCO 42 or to Safety Codes A1, A5, A9 and A10 in contractual documents or CERN rules and regulations shall be deemed to constitute a reference to the corresponding provisions of the documents listed below.   "The CERN Safety Policy" "Safety Regulation SR-SO - Responsibilities and organisational structure in matters of Safety at CERN" "General Safety Instruction GSI-SO-1 - Departmental Safety Officer (DSO)" "General Safety Instruction GSI-SO-2 - Territorial Safety Officer (TSO)" "General Safety Instruction GSI-SO-3 - Safety Linkperson (SLP)" "General Safety Instruction GSI-SO-4 - Large Experiment Group Leader In Matters of Safety (LEXGLI...

  15. Kandinsky College Visits CERN

    CERN Multimedia

    CERN Video productions; Angelos Alexopoulos

    2012-01-01

    This video documents the visit of nine senior high school students of the Kandinsky College in Nijmegen (Netherelands) to CERN. The students visited many of CERN's experimental facilities, took part in a Cloud Chamber workshop, attended talks and roundtable discussions of SpacePart12 and worked on the evaluation of the Microcosm exhibition as part of a school inquiry-based research project. The students and their teacher, Paul de Haas (a participant of the High School Teachers 2012 Programme at CERN) were connected with Prof. Christine Kourkoumelis and George Vasileiadis at the University of Athens and learned hands-on how to analyse real physics events, including Higgs-like ones, from the ATLAS experiment at the LHC using the HYPATIA Applet.

  16. Cern Cricket Club

    CERN Multimedia

    Cern Cricket Club

    2014-01-01

      Cern Cricket Club The CERN Cricket Club 2014 season has started earlier than usual, with a game scheduled for the first time ever on Easter Sunday.  Due to repair work for the damage done to the ground because of the “Bosons&More” party at the end of September, all games until June have had to be scheduled away. Net practice, which normally takes place on the ground from mid-April, will not start until mid-June. The club is always looking for new players and newcomers will be made very welcome. Anyone who is interested in joining the club should sign up on our web site: http://cern.ch/Club-Cricket/    

  17. CERN Relay Race

    CERN Multimedia

    2005-01-01

    The CERN Relay Race will take place around the Meyrin site on Wednesday 18 May between 12.15 and 12.35. This year, weather permitting, there will be some new attractions in the start/finish area on the field behind the Main Building. You will be able to: listen to music played by the CERN Jazz Club; buy drinks at the bar organised by the CERN Running Club; buy lunch served directly on the terrace by the restaurant Novae. ATTENTION: concerning traffic, the recommendations are the same as always: If possible, please avoid driving on the site during this 20 minute period. If you do meet runners in your car, please STOP until they all have passed. Thank you for your understanding.

  18. 78 FR 55648 - Signal Booster Rules

    Science.gov (United States)

    2013-09-11

    ...), published at 78 FR 21555, April 11, 2013, are effective September 11, 2013. FOR FURTHER INFORMATION CONTACT... protect Customer Proprietary Network Information (CPNI). Privacy Act: The information collection... facilitate review of wireless providers' behavior regarding Consumer Signal Boosters, the R&O requires...

  19. Spacecraft and their Boosters. Aerospace Education I.

    Science.gov (United States)

    Coard, E. A.

    This book, one in the series on Aerospace Education I, provides a description of some of the discoveries that spacecraft have made possible and of the experience that American astronauts have had in piloting spacecraft. The basic principles behind the operation of spacecraft and their boosters are explained. Descriptions are also included on…

  20. Black Holes as Dark Matter Annihilation Boosters

    OpenAIRE

    Mattia FornasaINFN Padova, IAP; Gianfranco Bertone(IAP)

    2007-01-01

    We review the consequences of the growth and evolution of Black Holes on the distribution of stars and Dark Matter (DM) around them. We focus in particular on Supermassive and Intermediate Mass Black Holes, and discuss under what circumstances they can lead to significant overdensities in the surrounding distribution of DM, thus effectively acting as DM annihilation boosters.

  1. CERN Relay Race

    CERN Document Server

    2008-01-01

    The CERN relay race will take place around the Meyrin site on Thursday 5 June starting at 12:15 p.m. If possible, please avoid driving on the site during this 20-minute period. If you do meet runners while driving your car, please STOP until they have all passed. Thank you for your cooperation. Details on how to register your team for the relay race are given on the Staff Association Bulletin web site. You can access the online registration form at: http://cern.ch/club-running-relay/form.html

  2. The significance of Cern

    CERN Multimedia

    Weisskopf,V

    Le Prof. V.Weisskopf, DG du Cern de 1961 à 1965, est né à Vienne, a fait ses études à Göttingen et a une carrière académique particulièrement riche. Il a travaillé à Berlin, Copenhague et Berlin et est parti aux Etats Unis pour participer au projet Manhattan et était Prof. au MTT jusqu'à 1960. Revenu en Europe, il a été DG du Cern et lui a donné l'impulsion que l'on sait.

  3. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2009-01-01

    Are you running Vista on your new PC – or are you planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual session of this course will take place on 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  4. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    Are you running Vista on your new PC – or are you planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  5. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    You are running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at mailto:Technical.Training@cern.ch

  6. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    Are you running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training course on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced in the use of Windows XP. The next bilingual sessions of this course will take place on 12 December 2008 and 30 January 2009. Register using our catalogue: http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at Technical.Training@cern.ch

  7. CERN Technical Training : Vista !

    CERN Multimedia

    HR Department

    2008-01-01

    You are running Vista on your new PC – or are planning to install it? The Technical Training service is organizing a half-day training on the new features of the VISTA operating system. This course introduces the new interfaces and presents the new functionalities for people who are experienced using Windows XP. The next bilingual sessions of this course will take place on December 12, 2008 and January 30, 2009. Register using our catalogue : http://cta.cern.ch/cta2/f?p=110:9 or contact us with your questions/comments at Technical.Training@cern.ch

  8. Poland at CERN

    CERN Multimedia

    CERN Press Office. Geneva

    2000-01-01

    On 17 October 2000, the second Polish industrial and technological exhibition opens at CERN*. The first one was held five years ago and nine of the companies that were present then have come back again this year. Six of those companies were awarded contracts with CERN in 1995. Three Polish officials were present at the Opening Ceremony today: Mrs Malgorzata Kozlowska, Under-secretary of State in the State Committee for Scientific Research, Mr Henryk Ogryczak, Under-secretary of State in Ministry of Economy and Prof. Jerzy Niewodniczanski, President of National Atomic Energy Agency.

  9. CERN firemen share their expertise

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Firemen from local fire brigades have been coming to CERN to learn modern fire-fighting techniques. This apparatus allows the simulation of the spectacular backdraft phenomenon, so firemen training at CERN learn to understand it.

  10. CHINA Continuing cooperation with CERN

    International Nuclear Information System (INIS)

    During a visit to China in July, CERN Director General Carlo Rubbia signed an agreement with the Chinese Academy of Sciences which provides a reciprocal framework for CERN and China to continue and develop their scientific and technical cooperation

  11. CERN Diversity Newsletter - March 2016

    CERN Document Server

    Kaltenhauser, Kristin; CERN. Geneva. HR Department

    2016-01-01

    Quarterly CERN Diversity Newsletter, informing on recent and ongoing diversity activities, and interesting reads, videos and other links related to diversity. Subscribe here: https://diversity.web.cern.ch/2015/07/subscribe-diversity-newsletter

  12. CERN Diversity Newsletter - November 2015

    CERN Document Server

    Kaltenhauser, Kristin; CERN. Geneva. HR Department

    2015-01-01

    Quarterly CERN Diversity Newsletter, informing on recent and ongoing diversity activities, and interesting reads, videos and other links related to diversity. Subscribe here: https://diversity.web.cern.ch/2015/07/subscribe-diversity-newsletter

  13. Une flamme pour le CERN

    CERN Multimedia

    2004-01-01

    For the 50th anniversary of CERN, letters posted from Saint Genis will bear a postmark to celebrate CERN's anniversary. Envelopes are also available from the Saint-Genis-Pouilly (France) post office (3 paragraphs)

  14. CERN 50th Anniversary : CERN's 50th anniversary celebrations drew to a close with a ceremony at Geneva University's Institut de Physique.

    CERN Multimedia

    Maximilien Brice

    2004-01-01

    For it was here, on the banks of the River Arve, that CERN's first staff members, from the PS Magnets Group, came to work in October 1953. The ceremony was followed by drinks and an exhibition of the activities of the School of Physics.

  15. WILL I AM visits CERN

    CERN Multimedia

    Noemi Caraban

    2013-01-01

    Will.i.am visited CERN in December 2013, fulfilling a wish he made in a video-link appearance at TEDxCERN earlier that year http://tedxcern.web.cern.ch/video/choral-performance-reach-stars-william. During his visit, he was shown the Antimatter Decelerator, the underground ATLAS experiment cavern and the CERN Control Centre. He also took the opportunity to promote CERN’s beam line for schools competition.

  16. CERN Video News on line

    CERN Document Server

    2003-01-01

    The latest CERN video news is on line. In this issue : an interview with the Director General and reports on the new home for the DELPHI barrel and the CERN firemen's spectacular training programme. There's also a vintage video news clip from 1954. See: www.cern.ch/video or Bulletin web page

  17. Operational behaviour of CO{sub 2} booster systems; Betriebsverhalten von CO{sub 2}-Booster-Systemen

    Energy Technology Data Exchange (ETDEWEB)

    Javerschek, Oliver; Hieble, Tobias [BITZER Kuehlmaschinenbau GmbH, Sindelfingen (Germany)

    2011-07-01

    The operating characteristics of booster systems and the resulting operating conditions of CO{sub 2} booster systems in supermarket refrigeration are explained and discussed. Criteria and challenges of different operating and load conditions are gone into. Simulated and measured operating states of a small-scale booster system are compared and evaluated. [German] In der vorliegenden Veroeffentlichung werden unterschiedliche Betriebsverhalten und die daraus resultierenden Betriebsbedingungen von CO{sub 2}-Booster-Systemen in der Supermarktkaelte erlaeutert und diskutiert. Dabei werden wesentliche Kriterien und Herausforderungen bei den unterschiedlichen Betriebs- und Lastbedingungen besprochen. Ausserdem werden simulierte und gemessene Betriebszustaende einer kleinen Booster-Kaelteanlage vergleichend betrachtet und bewertet.

  18. Women at CERN

    CERN Multimedia

    2004-01-01

    To mark International Women's Day on 8 March, the Weekly Bulletin has looked at the careers of six female physicists, engineers and administrators working at CERN. A frequent question on the lips of newcomers to CERN as they take a quick look around them is 'But where are the women?' However, while it's true that the Laboratory has never had a huge number of female personnel, a closer look reveals that there are in fact quite a few around. To mark International Women's Day, the Bulletin has interviewed six women working at CERN to find out how they see the Organization, what they do and what they think about their daily working lives. Creating a link 'Maybe because I grew up during World War II, my parents always taught me to respect people of other nationalities, religions, colour, etc., so one thing I have always appreciated about CERN is that it promotes this tolerance and understanding by giving us the great privilege of working side by side with colleagues from many cultures and walks of life.' Pegg...

  19. La Nascita del CERN

    CERN Multimedia

    Fidecaro, Giuseppe

    2004-01-01

    CERN is born on 30 Sep 1954, just after the signature in Paris of a Convention for the creation of an European Center for Nuclear Research. It was a need to recreate a multilateral collaboration to start again scientific Research after the War (2 pages)

  20. Satellite photo of CERN

    CERN Multimedia

    1991-01-01

    This photo from the Landsat5 orbital telescope shows the locations of CERN's Meyrin and Prevessin sites near Geneva on the Swiss-France border. The tunnels housing the LHC and SPS accelerators are also illustrated. Photo credit: US Geological Survey/photo by Jane Doe.

  1. Disney World sur CERN

    CERN Multimedia

    Bieri, P

    1998-01-01

    "'Cela ressemble à un film de James Bond.' Des milliers de curieux se sont rendus, hier, dans le temple genevois de la science ouvert au public. Opération de charme réussie pour le CERN, qu i s'est ainsi refait une image" (1 page)

  2. Commissaire Moulin visits CERN

    CERN Multimedia

    CERN Bulletin

    2014-01-01

    The French actor and film-maker Yves Rénier was shown around the Laboratory on Friday 6 June by friends at CERN.   Yves Rénier at LEIR. (Photo: Ludwig Pregernig) A keen diver and star of the long-running French television police drama Commissaire Moulin, Yves Rénier took advantage of a stopover in Geneva on his way to the Red Sea to meet up with his friends from the CERN Diving Club, who were only too pleased to take him on a tour of the Laboratory. In the morning, Yves Rénier visited the CERN Control Centre (CCC), Linac2 and LEIR. After lunch at the brasserie in Restaurant No. 2, the actor continued his tour with the CERN Computer Centre, the SM18 superconducting magnet test facility, and lastly the ATLAS experiment. “Thank you so much for showing me around and introducing me to a world I knew so little about,” confided Yves Rénier. “It’s fascinating to see so many scientists of different cultures,...

  3. CERN's future secured

    CERN Multimedia

    2003-01-01

    The CERN Council held its 123rd session on 13 December under the chairmanship of Professor Maurice Bourquin. The election of the next Director General, the Baseline Plan for 2003-2010 and a new status for non-European states were among the items agreed. In addition, the European Investment Bank has agreed a loan of 300 million EUR to complete the LHC.

  4. CERN: LHC magnets

    International Nuclear Information System (INIS)

    With test magnets for CERN's LHC proton-proton collider regularly attaining field strengths which show that 10 Tesla is not forbidden territory, attention turns to why and where quenches happen. If 'training' can be reduced, superconducting magnets become easier to commission

  5. CERN fellows and visitors

    CERN Multimedia

    Penney, R. W.

    1963-01-01

    This article describes the Fellowship and Visitor Programme as it is at present, detailing the various headings under which the visitors come and indicating the methods by which they are chosen. The way in which their work is integrated into the general scientific activity of CERN is discussed briefly.

  6. CERN: 50 and counting

    International Nuclear Information System (INIS)

    Fifty years is a long time in particle physics - and not just because most subatomic particles only exist for tiny fractions of a second. In 1954, the year that CERN was established, the leading high-energy laboratories in the US, and indeed the world, were at Berkeley in California and Brookhaven in New York. Today these two labs - with nine Nobel prizes for discoveries in particle physics between them - have been replaced by Stanford (established in 1962) and Fermilab (1967) as the focal points of high-energy physics in the US. CERN did not reach its current position of strength overnight. In the early years it struggled as US labs dominated the field and beat Europe's new lab to the big discoveries. The tide turned with the detection of weak neutral currents in 1973, and the discovery of the W and Z bosons 10 years later showed that CERN was capable of making truly massive discoveries. Today, completing the Large Hadron Collider (LHC) and its four detectors on schedule and within budget, and then ensuring that they run reliably from 2007 onwards, are CERN's top priorities. (U.K.)

  7. CERN apprenticeship scheme honoured

    CERN Multimedia

    2008-01-01

    Prestigious awards for two apprentices who did their practical training at CERN. Sylvain Heinzen, apprentice physics lab technician at CERN, receiving his award from Pierre-François UNGER, State Councillor responsible for the Federal Department of the Economy and Health. The other award-winner, Cédric Gerber, is on the right of the photo.Among Geneva’s top apprentices who were honoured by the Fondation sociale de l’Union industrielle genevoise (UIG) on 28 October this year, were two CERN apprentices. Electronics technician Cédric Gerber and physics lab technician Sylvain Heinzen both did their four-year sandwich course at CERN, obtaining their professional qualification, the Certificat fédéral de capacité (CFC), in June. On top of that, Cédric Gerber, who had been a particularly outstanding apprentice, received two further distinctions at the CFC awards ceremony - the State Council prize for achieving one of the top-ten o...

  8. Give blood at CERN

    CERN Multimedia

    SC Unit

    2008-01-01

    ACCIDENTS and ILLNESSES don’t take a break! DO SOMETHING AMAZING - GIVE BLOOD! IT’S IN ALL OUR INTERESTS. 30 July 2008 from 9.30 a.m. to 4 p.m. CERN RESTAURANT NOVAE First floor - Salle des Pas Perdus After you have given blood, you are invited to partake of refreshments kindly offered by NOVAE.

  9. CERN CAR CLUB

    CERN Multimedia

    Automobile club

    2009-01-01

    You are cordially invited to the next General Assembly of the CERN Car Club Tuesday 12 January 2010 at 5:45pm Bldg. 593 / room 11 As the end of 2009 is approaching, it is time to think about renewing your subscription. Therefore next time you are on the CERN-Meyrin site or at the Post Office counter don’t forget to fill in the payment slip to continue to be a part of our large family. The fee remains unchanged: 50 CHF. For those of you who are regular users of our equipment and who know of all the advantages that the club is in a position to offer, it seems pointless to give details, we are sure that many of you have made use of them and are satisfied. We remind you everyone working on CERN site is entitled to become a member of our club, this includes industrial support personnel and staff of companies which have a contract with CERN. If you are not yet a member, come and visit us! We will be happy to welcome you and show you the facilities, or you can visit our web site. The use of the club&...

  10. A heatwave at CERN

    CERN Multimedia

    Anaïs Schaeffer

    2011-01-01

    It's getting hot in Buildings 201 and 860, over-heating even... But no reason to panic! We're talking about the superheated water boilers of CERN's two heating plants, which heat all the buildings on the Meyrin and Prévessin sites.   View of the three boilers and the control centre of the Meyrin heating plant. CERN's two heating plants each comprise three gas* boilers, with generators of 15 MW in the case of Meyrin and 5 MW in the case of Prévessin. Both inject pressurised water, superheated to 125 degrees, into several kilometres of pipes, 22 km on the Meyrin site and 5 km in Prévessin. "A single boiler is sufficient most of the time but a second kicks in automatically during very cold weather, and a third is there on stand-by," explains Christophe Martel, head of the GS Department section responsible for CERN's heating and air-conditioning systems. All of CERN's buildings have a sub-station that receives the superheated water from the boilers an...

  11. DESY greets CERN

    CERN Multimedia

    Helmut Dosch, Chairman of the DESY Board of Directors, continues the series of occasional exchanges between CERN and other laboratories world-wide. As part of this exchange, CERN Director-General Rolf Heuer wrote a message in DESY inForm. Helmut Dosch took over from Albrecht Wagner in March 2009. You may think that the connections between CERN and DESY are obvious – particle physics labs with record-breaking accelerators and users from all around the world trying to solve mankind’s great mysteries. We even exchanged a few Directors. But did you know that there are similarities that are much closer to home – for example that both labs have names for their staff in the host language that are untranslatable into English? You are CERNoises and CERNois, we are DESYanerinnen and DESYaner. And in the end it’s the people it all comes down to. We at DESY admire the resourcefulness, enthusiasm, dedication and perseverance with which you at CERN have designed, built, started ...

  12. Muse at CERN

    CERN Multimedia

    CERN Bulletin

    2016-01-01

    On 19 July, the world-famous, English rock band, Muse, visited CERN before taking centre-stage at Nyon’s Paléo Festival. They toured some of CERN’s installations, including the Synchrocyclotron and the Microcosm exhibition, and also looked in on CMS and the Antimatter Factory.    

  13. Bhutan at CERN

    CERN Multimedia

    2002-01-01

    On Tuesday 12 March, CERN received an extraordinary visitor, a very great representative of a very tiny country. His Royal Highness, Dasho Jigme Khesar Namgyal Wangchuk, Crown Prince of Bhutan, visited the assembly site of CMS. For those whose geographical knowledge is weak, Bhutan is a tiny bhuddist kingdom, nestled in the Himalayas and surrounded by two giants, India and China.

  14. The CERN Accelerator School

    CERN Multimedia

    2016-01-01

    Introduction to accelerator physics The CERN Accelerator School: Introduction to Accelerator Physics, which should have taken place in Istanbul, Turkey, later this year has now been relocated to Budapest, Hungary.  Further details regarding the new hotel and dates will be made available as soon as possible on a new Indico site at the end of May.

  15. CERN celebrates another milestone

    CERN Multimedia

    2007-01-01

    "CERN (the European Organization for Nuclear Research) recently celebrated the lowering of the gigantic toroid magnet end-cap, using an EOT crane, onto the cavern floor. After a two-hour operation, the installation teams from ATLAS, PH-ATI and TS could finally breath a sigh of relief." (1/2 page)

  16. Improved safety at CERN

    CERN Document Server

    2006-01-01

    As announced in Weekly Bulletin No. 43/2006, a new approach to the implementation of Safety at CERN has been decided, which required taking some managerial decisions. The guidelines of the new approach are described in the document 'New approach to Safety implementation at CERN', which also summarizes the main managerial decisions I have taken to strengthen compliance with the CERN Safety policy and Rules. To this end I have also reviewed the mandates of the Safety Commission and the Safety Policy Committee (SAPOCO). Some details of the document 'Safety Policy at CERN' (also known as SAPOCO42) have been modified accordingly; its essential principles, unchanged, remain the basis for the safety policy of the Organisation. I would also like to inform you that I have appointed Dr M. Bona as the new Head of the Safety Commission until 31.12.2008, and that I will proceed soon to the appointment of the members of the new Safety Policy Committee. All members of the personnel are deemed to have taken note of the d...

  17. CERN in the blogosphere

    CERN Multimedia

    CERN Bulletin

    2011-01-01

    CERN communicates with the outside world in many different ways – websites, publications, through the media and via twitter to name but a few. As of January, CERN has a new way of engaging with the world: a CERN institutional blog.   CERN’s blog was launched on 10 January on the Quantum Diaries platform, adding a new strand to a well-established site. Quantum Diaries was launched in 2005 as an initiative for the World Year of Physics promoted by the InterAction collaboration, a group that brings together the communication offices of some of the world’s major particle physics labs and organisations. The launch of institutional blogs from Brookhaven, CERN, Fermilab and TRIUMF has added an extra dimension to Quantum Diaries. Visits to the site jumped to 3000 per day with the addition of the institutional blogs, and that number is already growing. CERN’s first post explains one of the reasons we’re doing this. With the incredible thirst for informati...

  18. CERN in detail

    CERN Multimedia

    Laëtitia Pedroso

    2010-01-01

    Before, you had to go on the TPG website to find a tram-route, use Google Maps to see an aerial photo of CERN, and look for CERN buildings on map.web.cern.ch. Now, that's ancient history, with a new Geographical Information System (GIS) Portal set up by the Design Office and Patrimony Service (GS/SEM/DOP).  It's a one-stop-shop for all this information and much more.   A screenshot of the GIS Portal. Over the past few days, you might have noticed the new interface called MAPSearch that pops up when you make a building search using the Building and Roads field on the CERN homepage. This is a simplified version of the new GIS web Portal, a project on which the GS Department's Design Office and Patrimony Service has been working since January 2010. "In today's informatics age, we need to respond ever more quickly to increasing numbers of specific user requests," explains Project Leader Youri Robert. This is more than just a new release of an old tool, it's a completely n...

  19. The CERN Accelerator School

    CERN Document Server

    2016-01-01

      Introduction to accelerator physics This course will take place in Istanbul, Turkey, from 18 to 30 September 2016. It is now open for registration, and further information can be found here: http://cas.web.cern.ch/cas/Turkey-2016/Turkey-advert.html

  20. Cern Golf Club

    CERN Multimedia

    Cern Golf Club

    2014-01-01

      The Cern Golf Club   Members are here with invited to the: Annual General Meeting which takes place Wednesday evening the 5th February 2014 at 18h00 in the Conference room in bldg 13-2-005. A committee member will be at CERN gate B, 17h50 and accompany “external” CGC members to the conference room. Agenda: 1. President’s report 2. Treasurer’s report 3. Election of the Committee for 2014 4. Election of  Auditors 5. Draft schedule for 2014 CGC-competitions and other events 6. “Corpo” report    7. Proposals and any other business Please forward any proposals (to any of the committee members) you have, including candidature for the 2014 committee minimum three days in advance before the meeting.      Cern Golf Club   Les membres de club de golf de CERN sont invités à l’Assemblée Géné...

  1. Cern Women's Club

    CERN Multimedia

    Club des cernoises

    2013-01-01

    Christmas SaleTuesday 26th November 2013, from 9:00 to 11:00 Main Building 60 Ground Floor Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch.

  2. CERN-Russian meeting

    CERN Multimedia

    1974-01-01

    (front) V.P Dzhelepov (Dubna) (2nd row) A. Serov (State Committee), I.G. Morozov (Vice-Minister for Atomic Energy), V.S. Kaftanov (ITEP) (back) A. Derevschikov, R. Anthoine, V. Savrin, S. Nurushev, E. Gabathuler, M. Steuer (see CERN Courier of August 1974)

  3. CERN's Guardian Angels

    CERN Multimedia

    2002-01-01

    Any trouble at CERN? The Technical Control Room operates the entire technical infrastructure of CERN every day, all year long. They deal with problems that go from simple water leaks to devastating power cuts.   The Technical Control Room with Kenneth Olesen and Mark Harvey, minutes before their starting time. This big room is probably the liveliest at CERN, since there's always someone there, everyday, all year long. Laurent Randot and Eric Lienard working in the Technical Control Room at CERN in building 212. They've started at 7 a.m. and today has been a relatively quiet day. There have been some microcuts in the electric net because of the wind. But these have been repaired rather quickly... The relief: It's 2.30 p.m. Time for Laurent Randot and Eric Lienard to show their colleagues Mark Harvey and Kenneth Olesen what has been going on during the morning. They are the next TCR team of the day. Mark Harvey and Kenneth Olesen start their working day. They will work until 11p.m., when another team wil...

  4. CERN CROQUET CLUB

    CERN Multimedia

    Cern Croquet Club

    2015-01-01

    CERN CROQUET CLUB   Prévessin site Introduction to croquet, and barbecue, at the club from 18.00 on Thursday 30th April. Please Email norferga@orange.fr by 28th April if you are coming.  Please wear flat-soled shoes. Looking forward to seeing. Norman Eatough, President

  5. Induced radioactivity at CERN

    CERN Multimedia

    1970-01-01

    A description of some of the problems and some of the advantages associated with the phenomenon of induced radioactivity at accelerator centres such as CERN. The author has worked in this field for several years and has recently written a book 'Induced Radioactivity' published by North-Holland.

  6. Tragic loss at CERN

    CERN Multimedia

    CERN Ski Club

    2015-01-01

    Tragic loss at CERN The CERN community is mourning the tragic loss of two members of the CERN Ski Club. On Sunday, April 12, an avalanche buried four out of five skiers, taking part in a ski touring in the region of the Becs de Bosson in Valais (CH). The fifth skier, who had not been buried in the snow,  courageously managed to save two of the skiers, but Hervé Milcent, 49 years, federal ski instructor, and Mattieu Cattin, 33 years, were buried under two to three meters of snow, far down the avalanche slope, and did not survive, despite the fast arrival of the mountain rescue. In its 40 years of existence, the CERN Ski Club, one of the biggest in the Geneva area, has never been confronted with such a tragedy. The passing of Hervé and Matthieu has deeply shocked and saddened all volunteers of the Club as well as the entire alpine community. The ski touring section of the club would like to honour its friend Hervé, who joined the club in 1998. In 2003 he became res...

  7. CERN SHOP CHRISTMAS SALE

    CERN Multimedia

    Visits & Exhibition Service

    2000-01-01

    Looking for Christmas present ideas? Come to the Reception Shop Special Stand in Meyrin, Main Building, ground floor, from Tuesday 12 to Thursday 14 December from 10.00 to 16.00.   Sweat-shirt col zippé, grey, blue, black (M, L, XL) 30.- Sweat-shirt col polo, grey, collar blue (M, L, XL) 30.- T-shirt, black, (M, L, XL) 15.- WWW T-shirt, white, bordeau (M, L, XL) 15.- CERN silk tie (3 colours) 33.- Fancy silk tie (blue, bordeau 25.- Silk scarf (blue, red, yellow) 35.- Swiss army knife with CERN logo 25.- New model of CERN watch 25.- New CERN baseball cap 10.- Antimatter (English/anglais) 30.- The Search for Infinity (French, Italian, English,) 35.- Auf der Suche nach dem Unendlichen 45.- If you miss this special occasion, the articles are also available at the Reception Shop in Building 33 from Monday to Saturday between 08.30 and 17.30 hrs (Shop will be closed at 12.00 on 22.12.).

  8. CERN Women's club

    CERN Multimedia

    CERN Women's club

    2010-01-01

    The Welcome Center The Welcome Center website for CERN newcomers – and everyone else at CERN – has celebrated its first anniversary in operation. It began as a project to organize all the various information available at CERN into an easy to use site, with advice to help you make the most of your time here. It continues to be updated as new information becomes available. Lori Hakulinen and her helpers offer to meet with anyone who has questions. They can advise you on weekend activities, local restaurants and where to buy hard to find items or some of your favorite things from home, in addition to all of the practicalities you need to know, such as how to find housing or have a telephone installed, where to take language classes and much, much more. It’s all listed at: http://cern.ch/club-cwc-newcomers In general, meetings take place the first and third Thursdays in the month at Restaurant No. 1 in the Children’s Dining Room. (Please consult the Homepage for schedu...

  9. CERN Cricket Club

    CERN Multimedia

    Staff Association

    2014-01-01

    CERN CRICKET CLUB   The CERN Cricket Club 2014 season has been a good one so far with the team qualifying for the Swiss Cup semi-finals, with home advantage on the Prevessin ground on Sunday, August 24th. Their opponents will only be known the day before when the final game in the Eastern Division is played.  The CERN ground hasn’t quite recovered from the Bosons&More party last year, the wet weather making it impossible to roll the ground, but the new, wider strip is a big improvement. Net practice eventually started in late July, which is probably why the results at the beginning of the season weren’t so good. As match reports are too long to be included in the weekly bulletin, the full reports and the schedule can be found under “Matches (Fixtures, results, reports)” on the Cricket Club web site at http://cern.ch/Club-Cricket/    Anyone interested in playing cricket is welcome to join us at net practice, which takes pla...

  10. CERN and space science

    CERN Multimedia

    2009-01-01

    The connection between CERN and space is tangible this week, as former CERN Fellow and ESA astronaut Christer Fuglesang begins the second week of his mission on space shuttle flight STS-128. I had the pleasure to meet Christer back in October 2008 at an IEEE symposium in Dresden, and he asked me whether we could give him something related to CERN for his official flight kit. We thought of caps and tee-shirts, but in the end decided to give him a neutralino as a symbol of the link between particle physics and the science of the Universe. Neutralinos are theoretical particles that the LHC will be looking for, and if they exist, they’re strong candidates for the Universe’s dark matter. Christer’s neutralino is just a model, of course, escaped from the particle zoo, but what better symbol of the connectedness of science? Christer Fuglesang is not the only link CERN has with the space shuttle programme. We’ve recently learned that...

  11. CERN Housing Service: Hostel

    CERN Multimedia

    CERN Housing Service

    2004-01-01

    Arrangements for the end of the year closure Hostel on the CERN site During the closure of CERN for Christmas and the New Year, the hostel will be closed from midday on Friday 17 December 2004 until Monday 3 January 2005 at 8:00. All accounts must be settled and room keys returned to the Reception before 10:00 on Friday 17 December 2004. Hostel in St. Genis-Pouilly The wing reserved for CERN will be closed from midday on Friday 17 December 2004 until Monday 3 January 2005 at 8:00. Anyone with no alternative but to stay in the Hostel during this period can be accommodated in another part of the building. The people concerned must make the appropriate reservations in person at the Reception of the St.-Genis Hostel, as far in advance as possible and in any case no later than Friday 10 December 2004. The total length of stay during the two weeks in question must be paid for in advance, no later than Friday10 December 2004. All reservations remaining unpaid after this date will be cancelled. Reception: CERN ...

  12. Space Launch System Accelerated Booster Development Cycle

    Science.gov (United States)

    Arockiam, Nicole; Whittecar, William; Edwards, Stephen

    2012-01-01

    With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study

  13. CERN HEALTH INSURANCE SCHEME (CHIS)

    CERN Document Server

    HR Department

    2002-01-01

    List of benefits for 2002 The CHIS list of benefits for 2002 is now available from the HR Division Website (under 'general information'). We wish to draw your attention to the fact that the copies of this list available at the CERN UNIQA Office are intended ONLY for CERN pensioners. CERN staff members are therefore kindly requested to print this list themselves from the Web. English version HERE We would like to take this opportunity to remind staff members that they should obtain medical expenses claim forms from their divisional secretariat and NOT from the CERN UNIQA Office, which has a limited supply intended for CERN pensioners ONLY. Human Resources Division Tel: 73635

  14. Development of Cogging at the Fermilab Booster

    CERN Document Server

    Seiya, K; Drennan, C; Pellico, W; Triplett, A K; Waller, A

    2015-01-01

    The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main Injector (MI) and Recycler (RR). The extraction kicker gap has to synchronize to the MI and RR injection bucket in order to avoid a beam loss at the rising edge of the extraction and injection kickers. Magnetic cogging is able to control the revolution frequency and the position of the gap using the magnetic field from dipole correctors while radial position feedback keeps the beam at the central orbit. The new cogging is expected to reduce beam loss due to the orbit changes and reduce beam energy loss when the gap is created. The progress of the magnetic cogging system development is going to be discussed in this paper.

  15. Tracking study of hadron collider boosters

    Energy Technology Data Exchange (ETDEWEB)

    Machida, S.; Bourianoff, G.; Huang, Y.; Mahale, N.

    1992-07-01

    A simulation code SIMPSONS (previously called 6D-TEASE T) of single- and multi-particle tracking has been developed for proton synchrotrons. The 6D phase space coordinates are calculated each time step including acceleration with an arbitrary ramping curve by integration of the rf phase. Space-charge effects are modelled by means of the Particle In Cell (PIC) method. We observed the transverse emittance growth around the injection energy of the Low Energy Booster (LEB) of the Superconducting Super Collider (SSC) with and without second harmonic rf cavities which reduce peak line density. We also employed the code to see the possible transverse emittance deterioration around the transition energy in the Medium Energy Booster (MEB) and to estimate the emittance dilution due to an injection error of the MEB.

  16. Fuel gas boosters in developing nations

    Energy Technology Data Exchange (ETDEWEB)

    Sumbles, Billy [VALERUS, Ahmadabad (India). South East Asia Regional; Paris, Mike [VALERUS, Houston, TX (United States)

    2008-07-01

    Regulations requiring the use of natural gas, as opposed to flaring, and the need for clean generation solutions are driving global demand for gas-fired generation and corresponding fuel gas booster stations. Gas-producing nations are looking for viable solutions to be able to capture and use natural gas. And nations in the Middle East, Asia and Europe are developing a gas infrastructure similar to the U.S. Gas transported across long distances in pipelines often requires compression to boost pressure and meet industrial needs. In many cases, the gas may need to be processed before it can be used. However, end-users cannot just order gas booster stations out of a catalogue. Several factors - such as turbine operation, gas quality, compression pressure requirements, and the extent of processing required - need to be considered before designing and installing such systems. (author)

  17. Development of Cogging at the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Seiya, K. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Chaurize, S. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Drennan, C. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Pellico, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Triplett, A. K. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Waller, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2015-01-30

    The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main Injector (MI) and Recycler (RR). The extraction kicker gap has to synchronize to the MI and RR injection bucket in order to avoid a beam loss at the rising edge of the extraction and injection kickers. Magnetic cogging is able to control the revolution frequency and the position of the gap using the magnetic field from dipole correctors while radial position feedback keeps the beam at the central orbit. The new cogging is expected to reduce beam loss due to the orbit changes and reduce beam energy loss when the gap is created. The progress of the magnetic cogging system development is going to be discussed in this paper.

  18. CERN & Society launches donation portal

    CERN Multimedia

    Cian O'Luanaigh

    2014-01-01

    The CERN & Society programme brings together projects in the areas of education and outreach, innovation and knowledge exchange, and culture and arts, that spread the CERN spirit of scientific curiosity for the inspiration and benefit of society. Today, CERN & Society is launching its "giving" website – a portal to allow donors to contribute to various projects and forge new relationships with CERN.   "The CERN & Society initiative in its embryonic form began almost three years ago, with the feeling that the laboratory could play a bigger role for the benefit of society," says Matteo Castoldi, Head of the CERN Development Office, who, with his team, is seeking supporters and ambassadors for the CERN & Society initiative. "The concept is not completely new – in some sense it is embedded in CERN’s DNA, as the laboratory helps society by creating knowledge and new technologies – but we would like to d...

  19. SNS RING STUDY AT THE AGS BOOSTER.

    Energy Technology Data Exchange (ETDEWEB)

    ZHANG, S.Y.; AHRENS, L.; BEEBE-WANG, J.; BLASKIEWICZ, M.; FEDOTOV, A.; GARDNER, C.; LEE, Y.Y.; LUCCIO, A.; MALITSKY, N.; ROSER, T.; WENG, W.T.; WEI, J.; ZENO, K.; REECE, K.; WANG, J.G.

    2000-06-30

    During the g-2 run at the BNL AGS in early 2000, a 200 MeV storage-ring-like magnetic cycle has been set-up and tuned at the Booster in preparing for the Spallation Neutron Source (SNS) accumulator ring study. In this article, we report the progress of the machine set-up, tuning, some preliminary studies, and the future plan.

  20. Pegasus Air-Launched Space Booster

    OpenAIRE

    Lindberg, Robert; Mosier, Marty

    1988-01-01

    The Pegasus Air-Launched Space Booster development program, begun in early 1987, has the objective of combining an innovative approach to satellite launch operations with the latest in proven launch vehicle technology. Air launch of small satellite payloads on Pegasus provides a substantial performance improvement over ground-launched systems and also offers new launch operations flexibility including the ability to launch directly into virtually any orbital inclination. This paper describes ...

  1. Booster linear accelerators for proton therapy

    International Nuclear Information System (INIS)

    Radiotherapy using proton beams of energies of order 200 MeV is now accepted as a feasible cancer treatment technique whose widespread use has so far been limited by the high costs of proposed facilities. AEA Technology have identified a low-cost solution using a linear accelerator to boost existing hospital cyclotrons. The present project status and the design of the booster linear accelerator are discussed. (Author) 4 tabs., 2 figs., 2 refs

  2. Status of the SOLEIL Booster Synchrotron

    CERN Document Server

    Loulergue, Alexandre

    2005-01-01

    SOLEIL is a 2.75 GeV third generation synchrotron radiation facility under construction near Paris. The injection system is composed of a 100 MeV electron Linac pre-accelerator followed by a full energy (2.75 GeV) booster synchrotron. The booster lattice is based on a FODO structure with missing magnet. With a circumference of 157 m and low field magnets (0.74 T), the emittance is of 150 nm.rad at 2.75 GeV. A flexible and economic ramping switched mode procedure for the main supply cycled up to 3 Hz and a 35 kW-352 MHz solid state amplifier powering the RF system are used. At present time, all the magnets, supports and vacuum have been received and tested. Half of the ring is already assembled and installation is the tunnel will begin in January 05. The pulsed elements and their pulser will be received and tested from January to April. The four main magnet power supplies will be received in February and tested in Marsh. We plan the booster commissioning with beam in May 2005.

  3. John Adams and CERN: Personal Recollections

    CERN Document Server

    Brianti, Giorgio

    2013-01-01

    By any standards, John Adams had a most remarkable career. He was involved in three important, emerging technologies, radar, particle accelerators and controlled fusion, and had an outstanding impact on the last two. Without a university education, he attained hierarchical positions of the highest level in prestigious national and international organizations. This article covers the CERN part of his career, by offering some personal insights into the different facets of his contributions to major accelerator projects, from the first strong-focusing synchrotron, the PS, to the SPS and its conversion to a proton–antiproton collider. In particular, it outlines his abilities as a leader of an international collaboration, which has served as an example for international initiatives in other disciplines.

  4. The CERN accelerators controls convergence project

    CERN Document Server

    Van den Eynden, Marc

    1999-01-01

    Summary form only given. The CERN PS and SL Accelerators controls groups have started in March 1998 a convergence effort aimed at building a common controls infrastructure for year 2001. The first activities concentrated on the definition of an object oriented Accelerator Device Model and Application Programming Interface (API) aimed at offering to high level application software developers a narrow and coherent view of the accelerator components. Efforts have also started to build the underlying middleware architecture that will support this model, including services based on the publish- subscribe paradigm. This presentation will highlight some aspects of this Accelerator Device model as seen form the application software level. A logical view of the associated middleware architecture that will transport Accelerator device data will also be discussed.

  5. France at CERN

    CERN Multimedia

    2005-01-01

    From 04 to 06 october 2005 Administration Building Bldg 60/61 - ground and 1st floor 09:00 - 17:30   Thirty-two companies will present their latest technology at the "France at CERN" exhibition. French industry will exhibit products and technologies which are related to the field of particle physics. The main subjects are: mechanical engineering, electrical engineering, electronics, data processing, various supplies, civil engineering and buildings, and vacuum and low temperature technology. The exhibition is organised by UBIFRANCE, the French Committee for Trade Events Abroad.  You will find below : the list of exhibitors.   A detailed programme will be available in due course at : your Departmental secretariat, the reception information desk, Building 33, the exhibition itself.   A detailed list of the firms involved is already available under the following FI link: http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm     LIST OF EXHIBITORS AIR LIQUIDE DTA ALSTOM...

  6. France at CERN

    CERN Multimedia

    2005-01-01

    From 04 to 06 october 2005 Administration Building Bldg 60/61 - ground and 1st floor 09:00 - 17:30   Thirty-two companies will present their latest technology at the "France at CERN" exhibition. French industry will exhibit products and technologies which are related to the field of particle physics. The main subjects are: mechanical engineering, electrical engineering, electronics, data processing, various supplies, civil engineering and buildings, and vacuum and low temperature technology. The exhibition is organised by UBIFRANCE, the French Committee for Trade Events Abroad.  You will find below : the list of exhibitors.   A detailed programme will be available in due course at : your Departmental secretariat, the reception information desk, Building 33, the exhibition itself.   A detailed list of the firms involved is already available under the following FI link: http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm     LIST OF EXHIBITORS AIR LIQUIDE DTA ALSTO...

  7. CERN School of Computing

    CERN Multimedia

    2007-01-01

    The 2007 CERN School of Computing, organised by CERN in collaboration with the University of Split (FESB) will be held from 20 to 31 August 2007 in Dubrovnik, Croatia. It is aimed at postgraduate students and research workers with a few years' experience in scientific physics, computing or related fields. Special themes this year are: GRID Technologies: The Grid track delivers unique theoretical and hands-on education on some of the most advanced GRID topics; Software Technologies: The Software track addresses some of the most relevant modern techniques and tools for large scale distributed software development and handling as well as for computer security; Physics Computing: The Physics Computing track focuses on informatics topics specific to the HEP community. After setting-the-scene lectures, it addresses data acquisition and ROOT. Grants from the European Union Framework Programme 6 (FP6) are available to participants to cover part or all of the cost of the School. More information can be found at...

  8. ERC rewards CERN researchers

    CERN Multimedia

    Rosaria Marraffino

    2015-01-01

    The European Research Council (ERC) has awarded starting grants to Magdalena Kowalska, a member of the ISOLDE physics team, and Claude Duhr, CERN Theory Division. The funding will enable them to build their own research teams at CERN, engaging postdocs and PhD students.   Magdalena Kowalska and Claude Duhr. The ERC fosters scientific excellence in Europe through competitive funding. Its grants are awarded to projects headed by researchers – both beginning-of-career and established – via an open, peer-reviewed competition. In December 2014, Magdalena Kowalska and Claude Duhr were awarded grants to pursue research in ultra-sensitive nuclear magnetic resonance (NMR) in liquids and mathematical structures in scattering amplitudes, respectively. “Our research project aims to apply an ultra-sensitive NMR technique using radioisotopes to liquids in order to study the interaction of metal ions with biological molecules such as proteins, DNA or RNA,” says Mag...

  9. ITALY AT CERN

    CERN Multimedia

    23 - 26 June 2003 Main Building Bldg 60 - ground and 1st floor 09.00 hrs - 17.30 hrs Twenty-four companies will present their latest technology at the "Italy at CERN" exhibition. The Italian industry will exhibit products and technologies which are related to the field of particle physics. The main subjects are: cryogenics and vacuum technologies, electric power and power electronics, mechanical components, small and precision machined mechanical components, engineering, industrial plants, industrial machinery, automation, telecommunication, instrumentation, data processing and electronics. The exhibition is being organised by the INFN of Padova. There follows : - the list of exhibitors. A detailed programme will be available in due course at : - your Divisional secretariat, - the exhibition, - on the SPL homepage http://spl-div.web.cern.ch/spl-div/member_states/exhibitions_visits.htm LIST OF EXHIBITORS 1 Aerimpianti Spa13 Europa Metalli - LMI spa 2 AERSAT Spa14 FBM ICOSS srl 3 Andalo' Gianni Srl15 Finsys...

  10. ITALY AT CERN

    CERN Multimedia

    2003-01-01

    23 - 26 June 2003 Main Building Bldg 60 - ground and 1st floor 09.30 hrs - 17.30 hrs Twenty-four companies will present their latest technology at the "Italy at CERN" exhibition. The Italian industry will exhibit products and technologies which are related to the field of particle physics. The main subjects are: cryogenics and vacuum technologies, electric power and power electronics, mechanical components, small and precision machined mechanical components, engineering, industrial plants, industrial machinery, automation, telecommunication, instrumentation, data processing and electronics. The exhibition is being organised by the INFN of Padova. There follows: - the list of exhibitors. A detailed programme will be available in due course: - from your Divisional secretariat, - at the exhibition, - on the SPL homepage http://spl-div.web.cern.ch/spl-div/member_states/exhibitions_visits.htm LISTE DES EXPOSANTS / LIST OF EXHIBITORS 1 Aerimpianti Spa13 Europa Metalli - LMI spa 2 AERSAT Spa14 FBM ICOSS srl 3 Anda...

  11. Italy at CERN

    CERN Multimedia

    Caroline Laignel

    2005-01-01

    15 - 17 November 2005 Main Building Bldg 60 - ground and 1st floor 09:00 - 17:30 Twenty-six companies will present their latest technology at the "Italy at CERN" exhibition. Italian industry will exhibit products and technologies which are related to the field of particle physics. The main subjects are: electrical engineering, electronics, logistics, mechanical engineering, vacuum and low-temperature technology.   The exhibition is being organised by the INFN in Padua. The exhibitors are listed below.   A detailed programme will be available in due course : from your Departmental secretariat, at the exhibition, on the FI homepage http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm LIST OF EXHIBITORS  Ansaldo Superconduttori Spa CAEN Spa CECOM Snc Consorzio Canavese Export CPE Italia Spa Criotec Impianti Srl CTE Sistemi Srl Carpenteria S. Antonio Spa E.E.I. Equipaggiamenti Elettronici Industriali Elettronica Conduttori Srl Goma Elettronica Spa ICAR Spa Intercond Spa Keno...

  12. CERN Courier goes digital

    CERN Multimedia

    Christine Sutton, CERN Courier editor

    2013-01-01

    The January/February 2013 issue of the CERN Courier offers a new way to access the content – the first digital edition of the magazine.   The CERN Courier dates back to August 1959, when the first issue appeared, consisting of 8 black-and-white pages. Since then it has seen many changes in design and layout, leading to the current full-colour editions of more than 50 pages on average. It went on the web for the first time in October 1998, when IOP Publishing took over the production work. Now, we have taken another step forward with a digital edition that provides yet another means to access the content beyond the web and print editions, which continue as before. To download the digital edition, click here. To sign up to the new issue alert, please visit: http://cerncourier.com/cws/sign-up.

  13. CERN Heart Days

    CERN Multimedia

    2003-01-01

    14 & 15 OCTOBER 2003 The Medical Service and the Fire Brigade invite everyone working at CERN to participate in the above event. INFIRMARY 9 am to 16.30 pm Building 57, ground floor No need to book HEALTHY HEART? Evaluation of personal cardiac risks through the monitoring of: Blood pressure Cholesterol and sugar levels Body Mass Index ... and more Leaflets, information and advice concerning cardiac issues FIRE BRIGADE 9 to 12am - Building 65 Please book (limited to 15 people/day) FIRST AID COURSES What to do in a Cardiac Emergency (3 h. duration) Places are limited and on reservation only (15 people/day). To book, e-mail the Medical Services on: service.medical@cern.ch

  14. CERN Heart Days

    CERN Multimedia

    2003-01-01

    14 & 15 OCTOBER 2003 The Medical Service and the Fire Brigade invite everyone working at CERN to participate in the above event. INFIRMARY 9 am to 16.30 pm Building 57, ground floor HEALTHY HEART? ♥ Evaluation of personal cardiac risks through the monitoring of: • Blood pressure • Cholesterol and sugar levels • Body Mass Index ... and more ♥ Leaflets, information and advice concerning cardiac issues FIRE BRIGADE 9 to 12am Building 65 FIRST AID COURSES ♥ What to do in a Cardiac Emergency (3 h duration) Places are limited and on reservation only (15 people / day) To book, E-mail the Medical Services on: service.medical@cern.ch

  15. CERN Heart Days

    CERN Multimedia

    2003-01-01

    14 & 15 OCTOBER 2003 The Medical Service and the Fire Brigade invite everyone working at CERN to participate in the above event. INFIRMARY 9 am to 16.30 pm Building 57, ground floor no need to book HEALTHY HEART? • Evaluation of personal cardiac risks through the monitoring of: Blood pressure Cholesterol and sugar levels Body Mass Index ... and more • Leaflets, information and advice concerning cardiac issues FIRE BRIGADE 9 to 12 am - Building 65 Please book (limited to 15 people/day) FIRST AID COURSES • What to do in a Cardiac Emergency (3 h. duration) Places are limited and on reservation only (15 people/day). To book, e-mail the Medical Services on: service.medical@cern.ch

  16. Germany at CERN

    CERN Multimedia

    C. Laignel / FI-DI

    2005-01-01

    From 1 to 3 march 2005 Administration Building Bldg 60/61 - ground and 1st floor 09:30 - 17:30 Twenty eight companies will present their latest technology at the "Germany at CERN" exhibition. German industry will exhibit products and technologies which are related to the field of particle physics. The main subjects are: mechanical engineering, particle detectors, electrical engineering, electronics, data processing, radiation protection and vacuum and low temperature techonology. The exhibition is organised by the Federal Minister of Education and Research (BMBF), Bonn. There follows: the list of exhibitors A detailed programme will be available in due course at : your Departemental secretariat, the reception information desk, Building 33, the exhibition. A detailed list of firms is available under the following FI link: http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm LIST OF EXHIBITORS ACCEL Instruments GmbH APRA-NORM Elektromechanik GmbH BABCOCK NOELL Nucle...

  17. Germany AT CERN

    CERN Multimedia

    C. Laignel / FI-DI

    2005-01-01

    From 1 to 3 march 2005 Administration Building Bldg 60/61 - ground and 1st floor 09:30 - 17:30 Twenty nine companies will present their latest technology at the "Germany at CERN" exhibition. German industry will exhibit products and technologies related to the field of particle physics. The main sectors represented will be: mechanical engineering, particle detectors, electrical engineering, electronics, data processing, radiation protection and vacuum and low temperature techonology. The exhibition is organised by the Federal Minister of Education and Research (BMBF), Bonn. The exhibitors are listed below. A detailed programme will be available in due course: from your Departemental secretariat, from the reception information desk, Building 33, at the exhibition itself. A detailed list of the participating firms is already available at the following FI link: http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm LIST OF EXHIBITORS ACCEL Instruments GmbH APRA-NORM Elekt...

  18. Germany AT CERN

    CERN Multimedia

    2005-01-01

    From 1 to 2 March 2005 Administration Building Bldg 60/61 - ground and 1st floor 09:30 - 17:30 Twenty nine companies will present their latest technology at the "Germany at CERN" exhibition. German industry will exhibit products and technologies related to the field of particle physics. The main sectors represented will be: mechanical engineering, particle detectors, electrical engineering, electronics, data processing, radiation protection and vacuum and low temperature techonology. The exhibition is organised by the Federal Ministry of Education and Research (BMBF), Bonn. The exhibitors are listed below. A detailed programme will be available in due course: from your Departemental secretariat, from the reception information desk, Building 33, at the exhibition itself. A detailed list of the participating firms is already available at the following FI link: http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm LIST OF EXHIBITORS ACCEL Instruments GmbH APRA-NORM Elekt...

  19. Monitoring Evolution at CERN

    CERN Document Server

    Andrade, P; Murphy, S; Pigueiras, L; Santos, M

    2015-01-01

    Over the past two years, the operation of the CERN Data Centres went through significant changes with the introduction of new mechanisms for hardware procurement, new services for cloud provisioning and configuration management, among other improvements. These changes resulted in an increase of resources being operated in a more dynamic environment. Today, the CERN Data Centres provide over 11000 multi-core processor servers, 130 PB disk servers, 100 PB tape robots, and 150 high performance tape drives. To cope with these developments, an evolution of the data centre monitoring tools was also required. This modernisation was based on a number of guiding rules: sustain the increase of resources, adapt to the new dynamic nature of the data centres, make monitoring data easier to share, give more flexibility to Service Managers on how they publish and consume monitoring metrics and logs, establish a common repository of monitoring data, optimise the handling of monitoring notifications, and replace the previous ...

  20. Belgian Firms Visit CERN

    CERN Multimedia

    2001-01-01

    Fifteen Belgian firms visited CERN last 2 and 3 April to present their know-how. Industrial sectors ranging from precision machining to electrical engineering and electronics were represented. And for the first time, companies from the Flemish and Brussels regions of the country joined their Walloon compatriots, who have come to CERN before. The visit was organised by Mr J.-M. Warêgne, economic and commercial attaché at the Belgian permanent mission for the French-speaking region, Mr J. Van de Vondel, his opposite number for the Flemish region, and Mrs E. Solowianiuk, economic and commercial counsellor at the Belgian permanent mission for the Brussels-Capital region.

  1. Ombud's Corner: Respect @ CERN

    CERN Document Server

    Sudeshna Datta-Cockerill

    2014-01-01

    Since 2010 CERN has been a member of the Geneva-based association "Le respect, ça change la vie". Four years later and in conjunction with CERN’s celebration of its 60 years of ‘science for peace’, it is time to launch a new respectful workplace awareness campaign under the auspices of the Ombud.   Mutual respect is a basic pillar of peace. At CERN, we pride ourselves on our history, which started when a handful of Europe’s visionary scientists saw the opportunity that an international laboratory for fundamental research would present in bringing nations together. That idea has worked very well and, today, our success can be measured not only in terms of unprecedented scientific achievements but also in terms of training and education, and exemplary collaboration across borders, cultures and an extensive range of differences. In order for history to continue along these positive lines, and coming back to the awareness campai...

  2. Great Britain at CERN

    CERN Multimedia

    2006-01-01

    From 14 to 16 November 2006 Administration Building, Bldg. 60/61 - ground and 1st floor 09.30 - 17.30 Fifteen companies will present their latest technologies at the 'Great Britain at CERN' exhibition. British industry will exhibit products and technologies related to the field of particle physics. The main fields represented will be computing technologies, electrical engineering, electronics, mechanical engineering, vacuum & low temperature technologies and particle detectors. The exhibition is organised by BEAMA Exhibitions (the British Electrotechnical and Allied Manufacturers Association). Below you will find: a list of the exhibitors. A detailed programme will be available in due course: from your Departmental secretariat, from the Reception information desk, Building 33, at the exhibition itself. A detailed list of the companies is available at the following FI link: http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm LIST OF EXHIBITORS 3D Metrics Almat...

  3. Great Britain at CERN

    CERN Multimedia

    2006-01-01

    From 14 to 16 November 2006 Administration Building, Bldg. 60/61 - ground and 1st floor 09.30 - 17.30 Fifteen companies will present their latest technologies at the 'Great Britain at CERN' exhibition. British industry will exhibit products and technologies related to the field of particle physics. The main fields represented will be computing technologies, electrical engineering, electronics, mechanical engineering, vacuum & low temperature technologies and particle detectors. The exhibition is organised by BEAMA Exhibitions (the British Electrotechnical and Allied Manufacturers Association). Below you will find: a list of the exhibitors. A detailed programme will be available in due course: from your Departmental secretariat, from the Reception information desk, Building 33, at the exhibition itself. A detailed list of the companies is available at the following FI link: http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm LIST OF EXHIBITORS 3D Metrics Alma...

  4. CERN: Towards LEP 200

    International Nuclear Information System (INIS)

    In March a cryomodule with four superconducting radiofrequency accelerating cavities operated for the first time in CERN's new LEP electron-positron collider, the result of many years of careful research and development work and an important step on the road to boost LEP energies from their initial level around 50 GeV per beam to above the 82 GeV threshold for production of W pairs

  5. CERN Relay Race 2009

    CERN Document Server

    2009-01-01

    The CERN relay race will take place around the Meyrin site on Thursday 14th May starting at 12:15. If possible, please avoid driving on the site during this 20-minute period. If you do meet runners while driving your car, please STOP until they have all passed. Thank you for your cooperation. More details on how to register your team for the relay race

  6. CERN access cards

    CERN Multimedia

    HR Department

    2007-01-01

    Holders of CERN access cards are reminded that the card is an official document. It is important to carry it with you at all times when you are on the site. This applies also to those on standby duty who are called out for emergency interventions. As announced in Weekly Bulletin 13/2006, any loss or theft of access cards must be declared to the competent external authorities.

  7. Discovery Mondays - CERN Microcosm

    CERN Multimedia

    Antonio Marin

    2003-01-01

    Le public est venu nombreux au sixième Lundi Découverte du 6.10.2003 pour voir et manipuler les outils des géomètres du CERN, o le groupe de métrologie de positionnement et de topométrie leur a concocté des animations d'une redoutable précision.

  8. CERN Women's Club

    CERN Multimedia

    Club des cernoises

    2011-01-01

    Coffee Morning Tuesday 11th October, 9:00 – 11:00 Bldg 504 (Restaurant No 2) 1st Floor, Club Room 3 Presentation of the charity to benefit from the Christmas Sale TERRE DES HOMMES New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  9. CERN: Accelerator school

    International Nuclear Information System (INIS)

    Full text: Jyvaskyla, a university town in central Finland, was the setting for last year's General Accelerator School organized by the CERN Accelerator School. Well over a hundred students - more than for some time - followed two weeks of lectures on a broad spectrum of accelerator topics, the first step en route to becoming the designers, builders and operators of the surprisingly large number of, accelerators of all kinds either built or planned throughout Europe and further afield. This was the fifth such school organized by CAS in a biennial cycle which alternates this introductory level with more advanced tuition. The next, advanced, school will be from 20 October - 1 November, hosted by Athens University on the Greek Island of Rhodes. (Application details will become available in Spring but would-be participants should already reserve the dates.) After Finland, the CAS caravan moved to Benalmadena near Malaga in Spain where, together with Seville University, they organized one of the joint US-CERN schools held every two years and focusing on frontier accelerator topics. This time the subject was electron-positron factories - machines for high luminosity experiments in phi, tau-charm, beauty and Z physics. Experts from both sides of the Atlantic and from Japan shared their knowledge with an equally representative audience and probed the many intensity related phenomena which must be mastered to reach design performance. A number of these topics will receive extended coverage in the next specialist CAS School which is a repeat - by public demand - of the highly successful radiofrequency course held in Oxford in 1991. This school will be in Capri, Italy, with the support of the University of Naples from 29 April to 5 May. Details and application forms are now available by e-mail (CASRF@CERNVM.CERN.CH), by fax (+41 22 7824836) or from Suzanne von Wartburg, CERN Accelerator School, 1211 Geneva 23, Switzerland

  10. Les outils du CERN

    CERN Document Server

    1999-01-01

    C'est le plus grand centre mondial de recherche en physique des particules. Les outils du Laboratoire, accélérateurs et détecteurs de particules, figurent parmi les instruments scientifiques les plus complexes au monde. Des prix Nobels ont d'ailleurs été attribués aux physiciens du CERN pour leurs développements.

  11. CERN Electronics Pool presentations

    CERN Multimedia

    2011-01-01

    The CERN Electronics Pool has organised a series of presentations in collaboration with oscilloscope manufacturers. The last one will take place according to the schedule below.   Time will be available at the end of the presentation to discuss your personal needs. The Agilent presentation had to be postponed and will be organised later. -     Lecroy: Thursday, 24 November 2011, in 530-R-030, 14:00 to 16:30.

  12. CERN Women's Club

    CERN Multimedia

    Club des Cernoises

    2013-01-01

    Coffee Morning Tuesday 11th  June 2013, 12:30 Annual Club Lunch at the restaurant “Bois Joly” in Crozet Those interested in helping should come along. New arrivals and all members are cordially invited.You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  13. Cern Women's Club

    CERN Multimedia

    Club des cernoises

    2013-01-01

    Coffee MorningTuesday 12th November 2013, from 9:00 to 11:00 Bldg 504 (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Organisation of Christmas Sale Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch.

  14. Cern Women's Club

    CERN Multimedia

    Club des cernoises

    2013-01-01

    Coffee MorningTuesday 9th April 2013, 9:00 – 14:00 Bldg 504 (Restaurant No 2 – DSR) Ground Floor Spring Jumble Sale Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  15. Cern Women's club

    CERN Multimedia

    Club des Cernoises

    2013-01-01

    Coffee Morning Tuesday 5th  February 2013, 9:00 – 11:00 Bldg 504 (Restaurant No 2 – DSR) 1st  Floor, Club Room 3 Presentation of cheque to Nous Aussi Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/    

  16. Cern Women's Club

    CERN Multimedia

    Club des cernoises

    2013-01-01

    Coffee MorningTuesday 12th March 2013, 9:00 – 11:00 Bldg 504 (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Eastern Tradition Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  17. Cern Women's Club

    CERN Document Server

    Club des cernoises

    2013-01-01

    Coffee MorningTuesday 14th January 2014, from 9 : 00 to 11: 00 Bldg 504 (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Epiphany (French tradition - "Tirer les rois")   Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch.

  18. Cern Women's Club

    CERN Multimedia

    Club des cernoises

    2012-01-01

    Coffee MorningTuesday 15th January 2013, 9:00 – 11:00 Bldg 504 (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Epiphany (French tradition – “Tirer les rois”) Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  19. Cern Women's Club

    CERN Multimedia

    Club des cernoises

    2013-01-01

    Coffee MorningTuesday 14th May 2013, 9:30 Bldg 504 (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Annual General Meeting Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch

  20. CERN Women's Club

    CERN Multimedia

    CERN Women's Club

    2012-01-01

    Coffee Morning Tuesday 15th  May 2012, 9:00 Building 504,  (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Annual General Meeting Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  1. CERN Women's Club

    CERN Multimedia

    CERN Women's Club

    2012-01-01

    offee Morning Tuesday 12th  June 2012, 12:30 Annual Club Lunch at "The Physalis" in Prévessin Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  2. CERN Women's Club

    CERN Multimedia

    CERN Women's Club

    2013-01-01

    Coffee Morning Tuesday 10th September 2013, 9:00 Bldg 504, (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Registration Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  3. Cern Women's Club

    CERN Multimedia

    Club des Cernoises

    2011-01-01

    Coffee Morning Tuesday 8th November 2011, 9:00 - 11:00 Bldg 504 (Restaurant No 2 - DSR) 1st Floor, Club Room 3 Organization of our Christmas Sale In favour of “Terre des Hommes” Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  4. CERN Women's Club

    CERN Multimedia

    CERN Women's Club

    2011-01-01

    Coffee Morning Tuesday 10th January 2012, 9:00 – 11:00 Bldg 504 (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Epiphany (French tradition – “Tirer les rois”) Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/

  5. Pb injector at CERN

    International Nuclear Information System (INIS)

    For the CERN Lead Ion Accelerating Facility (achieved within a collaboration of several outside laboratories and with financial help of some member states) a new dedicated Linac has been built. This Linac has been installed in 1994 and served during two extended physics runs. This paper reviews the main characteristics of this machine and describes the first operational experience. Emphasis is put on new features of this accelerator, its associated equipment and on the peculiarities of heavy ions. (author)

  6. CERN: an aerial view

    CERN Multimedia

    2004-01-01

    On 30th January, when CERN still resembled a winter wonderland, a helicopter with a photographer on board took off on an aerial tour. One sunny morning at the end of January, when the area was waking up to an overnight snowfall, a helicopter took off from the Meyrin site with a CERN photographer on board. CERN has been the subject of aerial photographs ever since its creation. Although its appearance has changed over the years, the Laboratory has aged well. The aerial photographs taken during its fifty-year history bear witness to its expansion, showing how a handful of buildings and a first accelerator have blossomed into an entire machine complex. Let's take to the skies and have a look at some of the photos taken on this crisp January morning: a sight for sore eyes! In the foreground, Building 40 on the Meyrin site is recognisable from its magnet shape.On the right of the Route de Meyrin (crossing the photo diagonally), next to Point 1, the work on the Globe of Innovation, which got underway at the beg...

  7. CERN Housing Service : HOSTELS

    CERN Multimedia

    2005-01-01

    ARRANGEMENTS FOR THE END-OF-YEAR CLOSURE Hostels on the CERN site During the CERN shutdown over Christmas and the New Year, the hostels will be closed from midday on Wednesday, 21 December 2005 until 7.30 a.m. on Thursday, 5 January 2006. All accounts must be settled and room keys returned to the Reception before 10.00 a.m. on Wednesday, 21 December 2005. Hostel in St. Genis-Pouilly The wing reserved for CERN will be closed from midday on Wednesday, 21 December 2005 until 8.00 a.m. on Thursday, 5 January 2006. Anyone with no alternative but to stay in the hostel during this period can be accommodated in another part of the building, subject to availability. Those concerned must make the appropriate reservations in person at the Reception of the St. Genis Hostel as early as possible and in any case no later than Wednesday, 14 December 2005. The total stay during the two weeks in question must be paid for in advance, no later than Wednesday, 14 December 2005. After this date, any reservations that have ...

  8. CERN GSM monitoring system

    CERN Multimedia

    Ghabrous Larrea, C

    2009-01-01

    As a result of the tremendous development of GSM services over the last years, the number of related services used by organizations has drastically increased. Therefore, monitoring GSM services is becoming a business critical issue in order to be able to react appropriately in case of incident. In order to provide with GSM coverage all the CERN underground facilities, more than 50 km of leaky feeder cable have been deployed. This infrastructure is also used to propagate VHF radio signals for the CERN’s fire brigade. Even though CERN’s mobile operator monitors the network, it cannot guarantee the availability of GSM services, and for sure not VHF services, where signals are carried by the leaky feeder cable. So, a global monitoring system has become critical to CERN. In addition, monitoring this infrastructure will allow to characterize its behaviour over time, especially with LHC operation. Given that commercial solutions were not yet mature, CERN developed a system based on GSM probes and an application...

  9. Upcycling CERN Exhibitions

    CERN Multimedia

    Katarina Anthony

    2015-01-01

    Summer is coming - and with it, a new Microcosm exhibition showcasing CERN (see here). But while the new exhibit is preparing to enchant visitors, many have been asking about the site's former content. Will it simply be out with the old and in with the new? Not as such!   The plasma ball from Microcosm is now on display at the LHCb site. As Microcosm's new content is moving in, its old content is moving up. From LHCb to IdeaSquare, former Microcosm displays and objects are being installed across the CERN site. "Microcosm featured many elements that were well suited to life outside of the exhibition," says Emma Sanders, Microcosm project leader in the EDU group. "We didn't want this popular content to go to waste, and so set out to find them new homes across CERN." The LHCb experiment has received a number of Microcosm favourites, including the Rutherford experiment, the cosmic ray display and the Thomson experiment. "We&...

  10. CERN printing infrastructure

    International Nuclear Information System (INIS)

    For many years CERN had a very sophisticated print server infrastructure [13] which supported several different protocols (AppleTalk, IPX and TCP/IP) and many different printing standards. Today's situation differs a lot: we have a much more homogenous network infrastructure, where TCP/IP is used everywhere and we have less printer models, which almost all work using current standards (i.e. they all provide PostScript drivers). This change gave us the possibility to review the printing architecture aiming at simplifying the infrastructure in order to achieve full automation of the service. The new infrastructure offers both: LPD service exposing print queues to Linux and Mac OS X computers and native printing for Windows based clients. The printer driver distribution is automatic and native on Windows and automated by custom mechanisms on Linux, where the appropriate Foomatic drivers are configured. Also the process of printer registration and queue creation is completely automated following the printer registration in the network database. At the end of 2006 we have moved all (∼1200) CERN printers and all users' connections at CERN to the new service. This paper will describe the new architecture and summarize the process of migration

  11. CERN honours Carlo Rubbia

    CERN Multimedia

    2009-01-01

    Carlo Rubbia turned 75 on March 31, and CERN held a symposium to mark his birthday and pay tribute to his impressive contribution to both CERN and science. Carlo Rubbia, 4th from right, together with the speakers at the symposium.On 7 April CERN hosted a celebration marking Carlo Rubbia’s 75th birthday and 25 years since he was awarded the Nobel Prize for Physics. "Today we will celebrate 100 years of Carlo Rubbia" joked CERN’s Director-General, Rolf Heuer in his opening speech, "75 years of his age and 25 years of the Nobel Prize." Rubbia received the Nobel Prize along with Simon van der Meer for contributions to the discovery of the W and Z bosons, carriers of the weak interaction. During the symposium, which was held in the Main Auditorium, several eminent speakers gave lectures on areas of science to which Carlo Rubbia made decisive contributions. Among those who spoke were Michel Spiro, Director of the French National Insti...

  12. Spanish Visit to CERN

    CERN Multimedia

    2002-01-01

    Last week CERN was visited by the Spanish Minister of Science and Technology, Josep Piqué i Camps. While here, he was able to visit the ATLAS assembly hall where many items of equipment are being built in collaboration with Spanish academic institutions or firms. These include the vacuum vessels for the ATLAS barrel toroid magnets supplied by the Spanish firm Felguera Construcciones Mechanics. Similarly, the Universidad Autónoma de Madrid is participating in the manufacture of the electromagnetic calorimeter endcaps, while the Barcelona Institute for High Energy Physics and the Valencia IFIC (Instituto de Física Corpuscular) are highly involved in the production of barrel modules for the tile calorimeter. The delegation, accompanied by Spanish scientists at CERN, also visited the LHC superconducting magnet test hall (photo). From left to right: Felix Rodriguez Mateos of CERN LHC Division, Josep Piqué i Camps, Spanish Minister of Science and Technology, César Dopazo, Director-General of CIEMAT (Spanish ...

  13. Serbian President visits CERN

    CERN Multimedia

    Katarina Anthony

    2012-01-01

    On Tuesday 10 January, Serbian President Boris Tadić visited the Laboratory to sign the Agreement of granting the status of Associate Membership as the pre-stage to full Membership of CERN.    Before the signing ceremony, the President, welcomed by Director-General Rolf Heuer at CERN’s Point 5, took the opportunity to visit CERN. After a general introduction, the President took advantage of the shutdown to visit the LHC’s underground caverns. Leading the President through their respective experiments were spokespersons Fabiola Gianotti (ATLAS) and Joe Incandela (CMS).  After a morning of tours, President Tadić and Rolf Heuer signed the Agreement. Serbia’s status as an Associate Member as pre-stage to full Membership is expected to come into force following ratification by the Serbian Parliament. After a maximum period of five years, the CERN Council will decide on the admission of Serbia to full Membership. This new agreement continues Serbia&a...

  14. CERN on the net

    CERN Document Server

    2008-01-01

    As all eyes turn to the LHC in the run-up to the big switch-on, online media are providing a keyhole into the deepest corners of CERN. From YouTube to blogs, communicating ideas has never before had the capacity to reach so many people. A wide range of websites comment on CERN.Blogs, YouTube, social networking, podcasting, Twitter, SecondLife, Flickr…. it’s easy to get lost in the ever expanding world of Web 2.0. But it’s also hard to ignore the fact that these web facilities are becoming a central part of everyday life, whether it’s for finding information, sharing interests with friends, keeping up to date with news, or simply for entertainment. CERN’s profile on these sites is also increasing, but as with everything on the Internet there is a huge range in the quality of information available, stretching from officially endorsed sites all the way to the plain ridiculous! This is our guide to some of the best CERN conte...

  15. On location at CERN

    CERN Multimedia

    Joannah Caborn Wengler

    2012-01-01

    CERN continues to be a very popular candidate for film locations at the moment. Not only has it inspired a German author and a film-maker interested in the more exotic interpretations of the science being worked on at the Organization, but even the recent puppet animation film by the legendary Muppets featured some CERN scenes.   Dr Bunsen Honeydew (far left) and his friends at ATLAS. Beaker, Bunsen's assistant, has just been sucked up the vacuum tube top left... Image courtesy Walt Disney Studios. In “The Muppet Movie”, released in November 2011 in North America and world-wide in January and February this year, Kermit is reuniting his friends who have ended up in some far-flung places since they last worked together 10 years ago. CERN caught the imagination of the film-makers as the perfect place for the Muppet scientists, Dr. Honeydew Bunsen and his hapless assistant Beaker. After a brief scene filmed in front of a backdrop of the ATLAS detector, the rest of the ...

  16. CERN's first female firefighter

    CERN Multimedia

    Alizée Dauvergne

    2010-01-01

    Until recently, the women's changing room in the Fire Station, built in 2005, has always been empty. With the arrival of Séverine Peverelly, CERN's first female firefighter, it now has a purpose. Séverine Peverelly took up her post as a firefighter in April. Séverine, who comes from Gap in France, took up her post as a firefighter in the CERN fire brigade at the beginning of April. "We were looking for a new member," explains David Peyron, Head of the Fire and Rescue Service. It didn't matter if it was a man or a woman; we needed a firefighter with the right skills, and Séverine just happened to have them." With ten years experience working in French fire services, Séverine was looking for a new challenge. "What attracted me to CERN was the international dimension, because that creates additional challenges," she explains. And these can be considerable! For one thing, every country has its own way of worki...

  17. Control week at CERN

    CERN Multimedia

    2008-01-01

    From 19 to 23 May, the IT-CO Group will be organising the first "Poster forum" at CERN on the theme of process control. Process control lies at the heart of numerous conferences across the world in which CERN takes an active part. Many posters have been produced, and these deserve to be presented to everybody in order to give value to, share and derive maximum benefit from the software, tools and methods developed and used at CERN in this field. This initiative will also allow each group, section and member of the personnel to present their work to others at the Laboratory. The forum will take place from 19 to 23 May in the main hall of Building 500, leading to Restaurant No. 1, on the Meyrin site. To stimulate discussions and exchanges, the authors will be in attendance by their posters on Thursday 22 May between 12 noon and 2.00 p.m. Interested? If you wish to take part and present your work, please contact mathias.philippe.dutou...

  18. New psychologist at CERN

    CERN Multimedia

    Laëtitia Pedroso

    2010-01-01

    A new psychologist, Sigrid Malandain, started work at CERN on 1 November. The psychologist’s office, formerly part of the Social Affairs Service in Human Resources, has now moved to the Medical Service (office 57-1-024). It is open every Tuesday and Thursday.   The new psychologist, Sigrid Malandain. Working in an organisation like CERN has numerous advantages. However, as in any professional setting, the work can sometimes bring stress, anxiety, overwork and so on. For this reason, a few years ago CERN brought in a psychologist for the staff. “As a psychologist, my role isn’t just to deal with known problems, but also to make assessments and, if possible, prevent difficult situations arising. Sometimes people realise that something is wrong, but they can’t say why. In such cases, I may be able to use a discussion to assess the nature of the problem and determine if further sessions are needed. If that is the case, I can either conduct the session...

  19. CERN, accelerator of motivation

    CERN Multimedia

    François Becler

    2014-01-01

    Have your dreams ever come true? My dream did, when I was lucky enough to be allowed into the world’s largest particle physics laboratory and spend five whole days there.   François, in front of LEP's DELPHI detector, displayed in the LHCb cavern. François was given the opportunity to visit the experiment during his placement at CERN. I’m a pupil in my last year at the Collège Jean-Jacques Rousseau in Saint-Julien-en-Genevois and was on a work experience placement at CERN from 16 to 20 December last year. I’m so happy I was chosen because working alongside physicists and engineers of all nationalities was like a dream come true. The first thing that impressed me was the size of the site, its infrastructures and facilities but also the fact that I was working in a prestigious, world-renowned organisation. I spent lots of time looking at the map and trying to find my way around... CERN's such a massive place ! Th...

  20. Denis Guedj at CERN

    CERN Multimedia

    2009-01-01

    Denis Guedj (right), pictured with Etiennette Auffray Hillemanns of the CMS collaboration and Hartmut Hillemanns of the DG-KTT group.French author Denis Guedj, who is also a mathematician and Professor of History of Science at Paris VIII University, visited CERN on 7 and 8 October. During a presentation in the CERN Library he discussed his 15 published books and likened the process of novel writing to working on a scientific experiment: it begins with a limited amount of data, and then questions arise, problems are solved and further research reveals truths. Denis Guedj works hard to ensure that his novels contain ‘true fiction’. His most recent visit to CERN will help him to write a new book set at the LHC in which he will combine his scientific interest in what happens when a proton and proton collide with a human story about what happens to a male and female physicist who meet in the LHC tunnel. "Visiting the CMS cavern was...

  1. CERN Housing Service: Hostel

    CERN Multimedia

    2004-01-01

    Arrangements for the end of the year closure Hostel on the CERN site During the closure of CERN for Christmas and the New Year, the hostel will be closed from mid-day on Friday, December 17, 2004 until Monday, January 3, 2005 at 8h00. All accounts must be settled and room keys returned to the Reception before 10h00 on Friday, December 17, 2004. Hostel in St. Genis-Pouilly The wing reserved for CERN will be closed from mid-day on Friday, December 17, 2004 until Monday, January 3, 2005 at 8h00. Anyone with no alternative but to stay in the Hostel during this period can be accommodated in another part of the building. The people concerned must make the appropriate reservations in person at the Reception of the St. Genis Hostel, as far in advance as possible and in any case no later than Friday, December 10, 2004. The total length of stay during the two weeks in question must be paid for in advance, no later than Friday, December 10, 2004. All reservations remaining unpaid after this date will be cancell...

  2. CERN HOUSING SERVICE: HOSTEL

    CERN Multimedia

    2003-01-01

    1. Arrangements for the end of the year closure 1.1 Hostel on the CERN site During the closure of CERN for Christmas and the New Year, the hostel will be closed from mid-day on Friday, December 19, 2003 until Monday, January 5, 2004 at 8h00. All accounts must be settled and room keys returned to the Reception before 10h00 on Friday, December 19, 2003. 1.2 Hostel in St. Genis-Pouilly The wing reserved for CERN will be closed from mid-day on Friday, December 19, 2003 until Monday, January 5, 2004 at 8h00. Anyone with no alternative but to stay in the Hostel during this period can be accommodated in another part of the building. The people concerned must make the appropriate reservations in person at the Reception of the St. Genis Hostel, as far in advance as possible and in any case no later than Friday, December 12, 2003. The total length of stay during the two weeks in question must be paid for in advance, no later than Friday, December 12, 2003. All reservations remaining unpaid after this date will be canc...

  3. CERN HOUSING SERVICE: HOSTEL

    CERN Multimedia

    2002-01-01

    1. Arrangements for the end of the year closure 1.1 Hostel on the CERN site During the closure of CERN for Christmas and the New Year, the hostel will be closed from midday on Friday 20 December 2002 until Monday 6 January 2003 at 8h00. All accounts must be settled and room keys returned to the Reception before 10h00 on Friday 20 December 2002. 1.2 Hostel in St. Genis-Pouilly The wing reserved for CERN will be closed from midday on Friday 20 December 2002 until Monday 6 January 2003 at 8h00. Anyone with no alternative but to stay in the Hostel during this period can be accommodated in another part of the building. The people concerned must make the appropriate reservations in person at the Reception of the St. Genis Hostel, as far in advance as possible and in any case no later than Friday 13 December 2002. The total length of stay during the two weeks in question must be paid for in advance, no later than Friday 13 December 2002. All reservations remaining unpaid after this date will be cancelled. 2. Reminde...

  4. Results from the October 2014 CERN test beam of LumiCal

    OpenAIRE

    Borysov, O.; Ghenescu, V.; Levy, A; Levy, I; Lukic, S.; Moron, J.; Neagu, A. T.; Preda, T.; Rosenblat, O.

    2016-01-01

    A prototype of a luminometer, designed for a future e+e- collider detector, was tested in the CERN PS accelerator T9 testbeam. The objective of this test beam was to demonstrate a multi-plane operation, to study the development of the electromagnetic shower and to compare it with MC simulations.

  5. CERN Library | Agnes Chavez @ CERN | 17 March

    CERN Multimedia

    2015-01-01

    Agnes Chavez will present her work on Tuesday, 17 March 2015 at 4 p.m. in the Library (Builidng. 52-1-052) Coffee will be served from 3.30 p.m.   Agnes Chavez is an artist and educator participating in a two-week research stay organised by the ATLAS Experiment at CERN. Chavez is using the stay to develop her art and education project, Projecting pARTicles, which will be exploring particle physics through projection art. Chavez experiments with data visualization, sound and projection art to create participatory environments. She collaborates with programmers to create algorithmic drawings projected on to buildings, walls and spaces. This work explores our relationship with nature and technology, and how these and other sensory experiences determine how we perceive and interpret the world around us. For the Projecting pARTicles series she has formed an interdisciplinary team of programmers, artists, scientists and educators to investigate how we can create art and education interventions inspire...

  6. A note on fuzzy PS-ideals in PS-algebra and its level subsets

    Directory of Open Access Journals (Sweden)

    Priya Thirugapillai

    2014-03-01

    Full Text Available In this paper, a new notion, named fuzzification of PS – Algebra, which is a generalization of BCK/BCI/TM/BH/Q/d/KU-algebras, is introduced, along with PS-ideal and we have discussed some of their properties in detail. Keywords: PS-Algebra, PS-ideal, Fuzzy PS-Ideal, Level Subsets, PS-Subalgebra and Fuzzy PS-Subalgebra.

  7. CERN: Fixed target targets

    International Nuclear Information System (INIS)

    Full text: While the immediate priority of CERN's research programme is to exploit to the full the world's largest accelerator, the LEP electron-positron collider and its concomitant LEP200 energy upgrade (January, page 1), CERN is also mindful of its long tradition of diversified research. Away from LEP and preparations for the LHC proton-proton collider to be built above LEP in the same 27-kilometre tunnel, CERN is also preparing for a new generation of heavy ion experiments using a new source, providing heavier ions (April 1992, page 8), with first physics expected next year. CERN's smallest accelerator, the LEAR Low Energy Antiproton Ring continues to cover a wide range of research topics, and saw a record number of hours of operation in 1992. The new ISOLDE on-line isotope separator was inaugurated last year (July, page 5) and physics is already underway. The remaining effort concentrates around fixed target experiments at the SPS synchrotron, which formed the main thrust of CERN's research during the late 1970s. With the SPS and LEAR now approaching middle age, their research future was extensively studied last year. Broadly, a vigorous SPS programme looks assured until at least the end of 1995. Decisions for the longer term future of the West Experimental Area of the SPS will have to take into account the heavy demand for test beams from work towards experiments at big colliders, both at CERN and elsewhere. The North Experimental Area is the scene of larger experiments with longer lead times. Several more years of LEAR exploitation are already in the pipeline, but for the longer term, the ambitious Superlear project for a superconducting ring (January 1992, page 7) did not catch on. Neutrino physics has a long tradition at CERN, and this continues with the preparations for two major projects, the Chorus and Nomad experiments (November 1991, page 7), to start next year in the West Area. Delicate neutrino oscillation effects could become

  8. A multichannel time-to-digital converter ASIC with better than 3 ps RMS time resolution

    International Nuclear Information System (INIS)

    The development of a new multichannel, fine-time resolution time-to-digital converter (TDC) ASIC is currently under development at CERN. A prototype TDC has been designed, fabricated and successfully verified with demonstrated time resolutions of better than 3 ps-rms. Least-significant-bit (LSB) sizes as small as 5 ps with a differential-non-linearity (DNL) of better than ±0.9 LSB and integral-non-linearity (INL) of better than ±1.3 LSB respectively have been achieved. The contribution describes the implemented architecture and presents measurement results of a prototype ASIC implemented in a commercial 130 nm technology

  9. Static reactive power compensation for the pulse power supply plant of the CERN booster

    CERN Document Server

    Jahn, K; Schluter, W

    1975-01-01

    If pulse power supplies with high-capacity static converters are connected directly to an 18 kV network without any special compensation measures being adopted, certain problems must be overcome. The article describes a new reactive-power compensation system in detail, a number of oscillograms being used to illustrate the results obtained. The system is also suitable for use in metallurgical plants and rolling mills where there are large fluctuations in the reactive power, and in steelworks for working in parallel with electric arc furnaces. (2 refs).

  10. CERN openlab enters fifth phase

    CERN Multimedia

    Andrew Purcell

    2015-01-01

    CERN openlab is a unique public-private partnership between CERN and leading ICT companies. At the start of this year, openlab officially entered its fifth phase, which will run until the end of 2017. For the first time in its history, it has extended beyond the CERN community to include other major European and international research laboratories.   Founded in 2001 to develop the innovative ICT systems needed to cope with the unprecedented computing challenges of the LHC, CERN openlab unites science and industry at the cutting edge of research and innovation. In a white paper published last year, CERN openlab set out the main ICT challenges it will tackle during its fifth phase, namely data acquisition, computing platforms, data storage architectures, computer management and provisioning, networks and connectivity, and data analytics. As it enters its fifth phase, CERN openlab is expanding to include other research laboratories. "Today, research centres in other disciplines are also st...

  11. Italy's Prime Minister visits CERN

    CERN Multimedia

    Stefania Pandolfi

    2015-01-01

    On Tuesday, 7 July 2015, the Prime Minister of the Italian Republic, Matteo Renzi, visited CERN. He was accompanied by a delegation that included Italy's Minister for Education, University and Research, Stefania Giannini.   From left to right: Fernando Ferroni, President of the Istituto Nazionale di Fisica Nucleare (INFN); Sergio Bertolucci, CERN Director for Research and Scientific Computing; Stefania Giannini, Italy's Minister of Education, University and Research; Matteo Renzi, Prime Minister of the Italian Republic; Fabiola Gianotti, CERN Director-General Designate; Rolf Heuer, CERN Director-General.   The Prime Minister was welcomed by members of the CERN Management together with former CERN Director-General and Senator for Life of the Italian Republic, Carlo Rubbia. After a brief general introduction to CERN’s activities by Rolf Heuer, the Italian delegation visited LHC Point 1. After a tour of the ATLAS control room, they donned helmets to visit th...

  12. CERN openlab summer student programme

    CERN Multimedia

    2013-01-01

    CERN openlab is currently taking applications for its summer student programme. The closing date for applications is 31 March 2013.   The openlab summer student programme is open for applications from bachelor, master and PhD students in computer science and physics. Successful applicants will spend 9 weeks at CERN, during the period from June to September 2013, working with some of the latest hardware and software technologies. The programme is more than just a summer at CERN: it can lead to follow-on projects at the home institute and may even inspire students to become entrepreneurs in cutting-edge computing technologies. A series of lectures will be given by experts in various domains of CERN-related high-throughput computing. Study tours of external companies and universities as well as of CERN facilities are also part of the programme. Please visit the CERN openlab website for more information.

  13. CERN openlab Summer Student Programme

    CERN Multimedia

    2012-01-01

    CERN openlab is currently taking applications for its summer student programme. The closing date for applications is 30 March 2012.   The openlab Summer Student Programme is open for applications from bachelor, master and PhD students in computer science and physics. Successful applicants will spend 8 weeks at CERN, during the period June to September 2012, to work with some of the latest hardware and software technologies. The programme is more than just a summer at CERN: it can lead to follow-on projects at the home institute and may even inspire the students to become entrepreneurs in cutting-edge computing technologies. A series of lectures will be given by experts in various domains of CERN related high-throughput computing. Study tours to external companies and universities as well as to CERN facilities are also part of the programme. Please visit www.cern.ch/openlab-students for more information.

  14. Speed of light exceeded in 31st CERN Relay

    CERN Multimedia

    2001-01-01

    In the closest-ever finish of the CERN relay race, Florian Marinet (number 54) of the Neutrinos to Gran Sasso team just fails to catch Pierre Maesen of The Shabbys on the line. The AThLetic AceS team (number 76) won the Veterans category by just 3 seconds from long-time participants The Lynx Runners, who didn't leave empty handed. They picked up the cup that is drawn at random. Evidence for new physics? No, simply evidence for faster legs. Only at CERN could the speed of light come third to a team called The Shabbys. But that's exactly what happened on Wednesday 23 May when the team from PS Division lifted the Opitz cup after winning the 31st CERN relay race. The Shabbys sped home in 10 minutes 53 seconds, just 0.3 of a second ahead of the 'Neutrinos to Gran Sasso' team. There's some logic there since it is the PS complex that will provide the protons that will give rise to the neutrino beam. As for 'c0 the speed of light', they took a relatively leisurely 11 minutes 1.6 seconds to cover the course. A total...

  15. Golden Jubilee photos: CERN gets a second Laboratory

    CERN Multimedia

    2004-01-01

    CERN's first large accelerator, the Proton Synchrotron (PS), had hardly come into operation at the beginning of the 1960s, when physicists started to dream of a machine ten times more powerful, operating at 300 Gigaelectronvolts. The construction of such an accelerator required a new laboratory to be built and several European sites were candidates. John Adams, the project leader, suggested using the PS as an injector for the new machine, to achieve the higher energy level at a lower cost. The new Laboratory was therefore to be built on a site adjacent to CERN. The project was approved in 1971, but the CERN Convention, which only provided for a single laboratory, had to be amended. An agreement was signed with France on 16 June 1972 (see photograph), establishing a new site at Prévessin, in the Pays de Gex. The two laboratories, which each had their own administrative structures and Directors-General, were merged in 1976.

  16. Upgrade Issues for the CERN Accelerator Complex

    CERN Document Server

    Garoby, R

    2008-01-01

    The Large Hadron Collider (LHC) at CERN is at a very advanced stage of hardware commissioning and the first beam collisions in the experiments are expected during the year 2008. In line with the recommendations issued in 2006 by the European Strategy Group for Particle Physics, work has now started for maximizing the physics reach of the LHC and for preparing for other foreseeable needs. Beyond upgrades in the LHC itself, mainly in the optics of the insertions, the injector complex has to be renewed to deliver beam with upgraded characteristics with a high reliability. In a first phase, a new 160 MeV H-linac ("Linac4") will be built to replace the present 50 MeV proton linac (Linac2) and extensive consolidation will be made. In a second phase, the present 26 GeV PS and its set of injectors (Linac2 + PSB) are planned to be replaced with a ~50 GeV synchrotron ("PS2") using a ~4 GeV superconducting proton linac ("SPL") as injector. The SPS itself will also be the subject of major improvements, to be able to cope...

  17. Scientific Information Service at CERN

    CERN Document Server

    Pereira, Margarida

    2016-01-01

    Dissemination of information is an essential part of CERN's mission. It brings people together from all around the world and trains the scientists of tomorrow. CERN scientific output is documented and made available for the scientific community and the general public through the CERN Document Server, INSPIRE-HEP and Wikipedia. This report presents the work done in the Scientific Information Service during the summer student program.

  18. Dear CERN and ESO Colleagues and Retirees

    CERN Multimedia

    Pension Fund

    2010-01-01

    Following approval by the CERN Pension Fund Governing Board, the CERN Pension Fund team is pleased to announce the new website address of your Pension Fund: http://pensionfund.cern.ch I take this opportunity to thank all the technical teams at CERN for the quality and rapidity of their support. Kind regards, Théodore Economou CEO, CERN Pension Fund

  19. CERN Permanent exhibitions short version

    CERN Multimedia

    2016-01-01

    Visits Explore by yourself the issues CERN's physicists are trying to solve: given that the entire universe is made of particles, where do they come from? Why do they behave in the way they do? Discover the massive apparatus used by physicists at CERN, like the LHC, and see how each part works. CERN invites the public to discover the mysteries of the Universe and the work of the world's biggest physics laboratory through free of charge guided tours and permanent exhibitions. As a group, with friends, individually, on foot, on your bike, come and discover CERN or explore it virtually. Welcome!

  20. News from the CERN Printshop

    CERN Multimedia

    IT Department

    2010-01-01

    Please note there are a limited number of the 2011 CERN wall calendars now available from the Printshop, located in Building 510-R-007. These have been printed on card in A3 and A4. If you need more than a few copies, there are two solutions: download the file and print your own on paper; send us an e-mail to place an order. Please visit the new Printshop website for more information: http://cern.ch/printshop. Printshop reception opening hours: 10h00-12h00 and 13h00-15h00. Many thanks. CERN Printshop Tel: 72426 E-mail: Printshop@cern.ch

  1. Digital Beam Trajectory and Orbit System, for the CERN Proton Synchrotron

    CERN Document Server

    Kasprowicz, G; Raich, U

    2008-01-01

    A new trajectory and orbit measurement system using fast signal sampling and digital signal processing in an FPGA is proposed for the CERN PS. The system uses a constant sampling frequency while the beam revolution frequency changes during acceleration. Synchronization with the beam is accomplished through a numerical PLL algorithm. This algorithm is also capable of treating RF gymnastics like bunch splitting or batch compression with the help of external timing signals. Baseline and position calculation are provided in the FPGA code as well. After having implemented the algorithms in C and MatLab and tested them with data from a test run at the PS, they have now been implemented in the FPGA for online use. Results of measurements on a single beam position monitor in the CERN PS and the SIS-18 at GSI will be presented.

  2. CERN Technical Training 2003: Learning for the LHC!

    CERN Multimedia

    2003-01-01

    AXEL-2003  -  Introduction to Particle Accelerators   AXEL-2003 is a course given at CERN within the framework of the Technical Training Programme. The course will present an introduction to particle accelerators. Known in the past as the PS Complex Operation Course (or the "PS Shutdown Course"), and organised by the ex-PS division until last year, it is now organised as a joint venture between the AB division and Technical Training, and open to a wider CERN community. The AXEL-2003 course series is designed for technicians who are operating an accelerator, or whose work is closely linked to accelerators, but it is open to all people (technicians, engineers, physicists) interested in this field. The course does not require any prior knowledge on accelerators. However, some basic knowledge on trigonometry, matrices and differential equations, and some basic notions of magnetism would be an advantage. The course and the course supports will be in English, with questions and answers also in French. Lectur...

  3. CERN Technical Training 2003: Learning for the LHC!

    CERN Multimedia

    2003-01-01

    AXEL-2003 - Introduction to Particle Accelerators AXEL-2003 is a course given at CERN within the framework of the Technical Training Programme. The course will present an introduction to particle accelerators. Known in the past as the PS Complex Operation Course (or the "PS Shutdown Course"), and organised by the ex-PS division until last year, it is now organised as a joint venture between the AB division and Technical Training, and open to a wider CERN community. The AXEL-2003 course series is designed for technicians who are operating an accelerator, or whose work is closely linked to accelerators, but it is open to all people (technicians, engineers, physicists) interested in this field. The course does not require any prior knowledge on accelerators. However, some basic knowledge on trigonometry, matrices and differential equations, and some basic notions of magnetism would be an advantage. The course and the course supports will be in English, with questions and answers also in French. Lectures wil...

  4. Exploration of tune point for booster

    International Nuclear Information System (INIS)

    Booster is working as a common injector for Indus-1 and Indus-2 synchrotron radiation sources at Raja Ramanna Centre for Advanced Technology. To augment its performance, new dipole and quadrupole magnets are being design as a replacement of the existing magnets. In the new quadrupole magnets, sextupole magnetic field is also incorporated for correction of natural chromaticity. In the presence of sextupole, multipoles and linear imperfections may reduce the dynamic aperture. The studies of the dynamic aperture with multipoles evolved in magnet design and magnet misalignment are carried out to explore a suitable tune point in vicinity of its operating tune point. Brief results are presented in this paper. (author)

  5. Booster of laboratory of high energy

    International Nuclear Information System (INIS)

    The initial design of synchrotron for acceleration of nuclei up to energy 0.5 GeV/n has been suggested. This accelerator will be used as a booster for designing the superconductive accelerator 'Nuclotron' and JINR syncrophrasotron as well. A magnetic lattice with separated functions consists of six periods and provides a betatron frequency of about 2.25. The horizontal and vertical acceptance (20 πcm x mrad) permits the multiturn injection to be realized by means of coupling resonance. (orig.)

  6. Space Transportation Booster Engine (STBE) configuration study

    Science.gov (United States)

    1986-01-01

    The overall objective of this Space Transportation Booster Engine (STBE) study is to identify candidate engine configurations which enhance vehicle performance and provide operational flexibility at low cost. The specific objectives are as follows: (1) to identify and evaluate candidate LOX/HC engine configurations for the Advanced Space Transportation System for an early 1995 IOC and a late 2000 IOC; (2) to select one optimum engine for each time period; 3) to prepare a conceptual design for each configuration; (4) to develop a technology plan for the 2000 IOC engine; and, (5) to prepare preliminary programmatic planning and analysis for the 1995 IOC engine.

  7. Harmonic analysis of the AGS Booster imperfection

    International Nuclear Information System (INIS)

    The harmonic content of magnetic field imperfections in the AGS Booster has been determined through careful measurements of the required field corrections of transverse resonances. An analysis of the required correction yielded amplitude and phase information which points to possible sources of imperfections. Dipole and quadrupole imperfections, which are proportional to the field of bending magnets (B), are mainly driven by any misalignment of the magnets. Quadrupole and sextupole imperfections, which are proportional to dB/dt, are driven by imperfections of the eddy-current correction system. The observations also suggest the presence of a remnant field

  8. The superconducting linac booster at the ANU

    International Nuclear Information System (INIS)

    This report outlines the progress of the installation of the superconducting Linac booster at the Australian National University. The Linac is based upon four modules, three of which contain three split-loop resonators. The fourth cryostat was intended to be a superbuncher and so houses only one resonator. The first stage of Linac operation will employ only three modules with 2 MV/m from each resonator. It is expected that the implementation of all nine modules, in subsequent stages, would boost beams by 18 MV/q. The project has fostered productive international collaboration between UK and Australian scientists. 1 tab., 6 figs

  9. Transition crossing simulation at the Fermilab Booster

    Energy Technology Data Exchange (ETDEWEB)

    Yang, X.; Drozhdin, A.I.; Pellico, W.; /Fermilab

    2007-06-01

    The demand in high intensity and low emittance of the beam extracted from the Booster requires a better control over the momentum spread growth and bunch length shortening at transition crossing, in order to prevent beam loss and coupled bunch instability. Since the transition crossing involves both longitudinal and transverse dynamics, the recently modified 3-D STRUCT code provides an opportunity to numerically investigate the different transition crossing schemes in the machine environment, and apply the results of simulation to minimize the beam loss and emittance growth operationally.

  10. Black Holes as Dark Matter Annihilation 'Boosters'

    International Nuclear Information System (INIS)

    The presence and growth of Intermediate and Supermassive Black Holes modify the surrounding distribution of stars and Dark Matter, and inevitably affect the prospects for indirectly detecting Dark Matter through its annihilation products. We show here that under specific circumstances, Black Holes can act as Dark Matter annihilation 'boosters'. In particular, we show that mini-spikes, i.e. Dark Matter overdensities around Intermediate-Mass Black Holes, would be bright sources of gamma-rays, well within the reach of the space telescope GLAST, that can be discriminated from ordinary astrophysical sources thanks to their peculiar energy spectrum and spatial distribution

  11. LHC Injectors Upgrade (LIU) Project at CERN

    CERN Document Server

    Shaposhnikova, Elena; Damerau, Heiko; Funken, Anne; Gilardoni, Simone; Goddard, Brennan; Hanke, Klaus; Kobzeva, Lelyzaveta; Lombardi, Alessandra; Manglunki, Django; Mataguez, Simon; Meddahi, Malika; Mikulec, Bettina; Rumolo, Giovanni; Scrivens, Richard; Vretenar, Maurizio

    2016-01-01

    A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LI...

  12. 2014 CERN Accelerator Schools

    CERN Multimedia

    2014-01-01

    A specialised school on Power Converters will be held in Baden, Switzerland, from 7 to 14 May 2014. Please note that the deadline for applications is 7 FEBRUARY 2014. A course on Introduction to Accelerator Physics will be held in Prague, Czech Republic, from 31 August to 12 September 2014. Applications are now open for this school; the application deadline is 25 APRIL 2014. Further information on these schools and other CAS events can be found on the CAS website and on the Indico page. For further information please contact Barbara.strasser@cern.ch

  13. CERN Relay Race

    CERN Document Server

    2011-01-01

    The CERN relay race will take place around the Meyrin site on Thursday 19 May starting at 12-15. If possible, please avoid driving on the site during this 20-minute period. If you do meet runners while driving your car, please STOP until they have all passed. Thank you for your cooperation. Details of the course and of how to register your team for the relay race can be found here. Some advice for all runners from the Medical Service can also be found here.   

  14. CERN hearing day

    CERN Multimedia

    2005-01-01

    1 in 10 people suffer from hearing loss - do you? The Medical Service invites everyone working on CERN premises to participate in the National Hearing Day on: Thursday 10th March From 9am to 4pm The Infirmary, Blg. 57, Gr.Fl. We will be offering hearing tests (audiogram); information, advice on hearing loss, tinnitus and more. Deafness does not just affect the elderly: in Europe, 50% the hearing-impaired are under the age of 55. Exposure to excessive noise is one of the main reasons for hearing loss. But prevention is possible and effective: for example, Hearing protection devices could reduce tinnitus cases by 80%.

  15. CERN hearing day

    CERN Multimedia

    2005-01-01

    1 in 10 people suffer from hearing loss ? do you? The Medical Service invites everyone working on the CERN site to participate in the NATIONAL HEARING DAY on: Thursday 10th March 2005 From 9am to 4pm The Infirmary, Blg. 57, Ground Floor We will be offering hearing tests (audiograms), as well as information and advice on hearing loss, tinnitus, etc. Deafness does not just affect the elderly: in Europe, 50% of the hearing-impaired are under the age of 55. Exposure to excessive noise is one of the main reasons for hearing problems but prevention is possible. For example, hearing protection devices can prevent 80% of tinnitus cases.

  16. CERN hearing day

    CERN Multimedia

    2005-01-01

    1 in 10 people suffer from hearing loss - do you? The Medical Service invites everyone working on the CERN site to participate in the NATIONAL HEARING DAY on: Thursday 10th March 2005 From 9am to 4pm The Infirmary, Blg. 57, Ground Floor We will be offering hearing tests (audiograms), as well as information and advice on hearing loss, tinnitus, etc. Deafness does not just affect the elderly: in Europe, 50% of the hearing-impaired are under the age of 55. Exposure to excessive noise is one of the main reasons for hearing problems but PREVENTION IS POSSIBLE. For example, hearing protection devices can prevent 80% of tinnitus cases.

  17. CERN hearing day

    CERN Multimedia

    2005-01-01

    1 in 10 people suffer from hearing loss - do you? The Medical Service invites everyone working on CERN premises to participate in the National Hearing Day on: Thursday 10th March From 9am to 4pm The Infirmary, Blg. 57, Gr.Fl. We will be offering hearing tests (audiogram); information, advice on hearing loss, tinnitus and more. Deafness does not just affect the elderly: in Europe, 50% the hearing-impaired are under the age of 55. Exposure to excessive noise is one of the main reasons for hearing loss. But PREVENTION IS POSSIBLE AND EFFECTIVE: for example, Hearing protection devices could reduce tinnitus cases by 80%.

  18. CERN safety week

    CERN Multimedia

    DG Unit

    2009-01-01

    Following an increase in the number of accidents in 2008, the Safety Commission is organising a CERN safety week from 8 to 12 June for riders of bicycles, scooters and motorbikes. We invite you to take part in the programme, which will be held in the Main Building (Bldg. 500) and will consist of an exhibition, organised events and hands-on activities, including demonstrations of emergency braking, a driving simulator, simulation of what it feels like to drive under the influence of alcohol, demonstrations by the Fire Brigade, video projections, etc. There will also be a number of prizes to be won. Please sign up via your DSO.

  19. Michael Frayn visits CERN

    CERN Multimedia

    2007-01-01

    Award-winning playwright and novelist Michael Frayn gave a guest lecture in the main auditorium at CERN on Friday 15 March about his new book The Human Touch: Our Part in the Creation of the Universe. The lecture focused on cosmology and philosophy and the limitations that language places on our ability to understand the creation of a universe in which we seem to play such a small part. In addition to his novels and plays, which include Copenhagen, a play about the 1941 meeting between German physicist Werner Heisenberg and Danish physicist Niels Bohr, Frayn has translated several works from Russian, including plays by Chekhov and Tolstoy.

  20. Spotlight on CERN

    CERN Multimedia

    CERN video productions

    2009-01-01

    Welcome to the Globe of Science and Innovation for the first "Spotlight on CERN" just a few weeks before the restart of the LHC machine. Today our guest is Mike Lamont, who is in charge of the Operations Group for the accelerator beams. This weekend, protons were injected into the LHC for the first time since September 2008. But before we talk about that, let's go back a few weeks and look at the previous stage, which involved testing the transfer lines of the injection tunnels TI2/TI8. Our video team was there to film this operation.

  1. Cern Women's club

    CERN Document Server

    Cern Women's club

    2014-01-01

    Coffee Morning Tuesday 14th October 2014, 9:30 – 11:30 Bldg 504 (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Presentation of the charity to benefit from the Christmas Sale “Les Jardins de Voltaire” Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch/Club-WomensClub/  

  2. Cern Women's Club

    CERN Multimedia

    Club des cernoises

    2013-01-01

    Coffee MorningTuesday 8th October 2013, from 9:00 to 11:00 Bldg 504 (Restaurant No 2 – DSR) 1st Floor, Club Room 3 Presentation of the charity to benefit from the Christmas Sale  “Au Coeur des Grottes”. Those interested in helping should come along. New arrivals and all members are cordially invited. You can enrol for membership, renew membership, find out about and sign up for our activities. Visit our website: http://club-womensclub.web.cern.ch.

  3. Tech meetups @ CERN

    CERN Document Server

    CERN. Geneva

    2014-01-01

    Nowadays it's quite important never to stop learning, to keep up with the new achievements of your field, especially in IT. Personally, I'm a big fan of meetups, hackathons and competitions. Beside their educative effect, they have a strong social aspect which can boost your motivation and serve as a source of inspiration as well. I'm going to talk about two meetups: Geneva Haskell Meetup, and CERN Coding Sessions. As both of them are excellent platforms to share, learn, inspire and get inspired, I'd like to spread the word about them.

  4. CONFERENCE FOR CERN PENSIONERS

    CERN Multimedia

    GS Department

    2010-01-01

    Wednesday 9 June 2010 from 2.30 p.m. to 5.00 p.m. Auditorium in Building 30 7-018 RESEARCH PROJECT “OPTIMUM BRAIN AGEING” Initial results of the study of the population of CERN pensioners Dr François HERRMANN, Geneva Technology and cognitive decline: prevention and compensation Professor Alain FRANCO, Nice, Vice-President of the IAGG (lnternational Association of Gerontology and Geriatrics) Discussion with the participants Admission free. The presentations will be in French.

  5. Conference for CERN pensioners

    CERN Multimedia

    GS Department

    2010-01-01

    Wednesday 9 June 2010 from 2.30 p.m. to 5.00 p.m. Auditorium in Building 30 7-018 RESEARCH PROJECT “OPTIMUM BRAIN AGEING” Initial results of the study of the population of CERN pensioners Dr François HERRMANN, Geneva Technology and cognitive decline: prevention and compensation Professor Alain FRANCO, Nice, Vice-President of the IAGG (lnternational Association of Gerontology and Geriatrics) Discussion with the participants Admission free. The presentations will be in French.

  6. 100ps time resolution with thin silicon pixel detectors and a SiGe HBT amplifier

    CERN Document Server

    Benoit, Mathieu; Débieux, Stéphane; Favre, Yannick; Iacobucci, Giuseppe; Nessi, Marzio; Paolozzi, Lorenzo; Shu, Kenji

    2016-01-01

    A 100um thick silicon detector with 1mm2 pad readout optimized for sub-nanosecond time resolution has been developed and tested. Coupled to a purposely developed amplifier based on SiGe HBT technology, this detector was characterized at the H8 beam line at the CERN SPS. An excellent time resolution of (106+-1)ps for silicon detectors was measured with minimum ionizing particles.

  7. Information on antiprotonic atoms and the nuclear periphery from the PS209 experiment

    OpenAIRE

    Trzcinska, A.; Jastrzebski, J.; Czosnyka, T.; von Egidy, T.; Gulda, K.; Hartmann, F. J.; Iwanicki, J.; Ketzer, B.; Kisielinski, M.; Klos, B.; Kurcewicz, W.; Lubinski, P.; Napiorkowski, P. J.; Pienkowski, L.; Schmidt, R.

    2001-01-01

    In the PS209 experiments at CERN two kinds of measurements were performed: the in-beam measurement of X-rays from antiprotonic atoms and the radiochemical, off-line determination of the yield of annihilation products with mass number A_t -1 (less by 1 than the target mass). Both methods give observables which allows to study the peripheral matter density composition and distribution.

  8. CERN PSB Beam Tests of CNAO Synchrotron's Digital LLRF

    CERN Document Server

    Angoletta, M E; De Martinis, C; Falbo, L; Findlay, A; Foglio, R; Hunt, S; Tourres, D; Vescovi, C

    2008-01-01

    The Italian National Centre for Oncological hAdrontherapy (CNAO), in its final construction phase, uses proton and carbon ion beams to treat patients affected by solid tumours. At the heart of CNAO is a 78- meter circumference synchrotron that accelerates particles to up to 400 MeV/u. The synchrotron relies on a digital LLRF system based upon Digital Signal Processors (DSPs) and Field Programmable Gate Array (FPGA). This system implements cavity servoing and beam control capabilities, such as phase and radial loops. Beam tests of the CNAO synchrotron LLRF system were carried out at CERN's Proton Synchrotron Booster (PSB) in autumn 2007, to verify the combined DSP/FPGA architecture and the beam control capabilities. For this, a prototype version of CNAO's LLRF system was adapted to the PSB requirements. This paper outlines the prototype system layout and describes the tests carried out and their results. In particular, system architecture and beam control capabilities were successfully proven by comparison wit...

  9. CERN videonews magazine Nr 2 : December 2002

    CERN Multimedia

    Audiovideo Service

    2002-01-01

    News from :ATRAP experiment's latest achievements. (CERN Bulletin 45/2002) CAST experiment. (CERN Bulletin 35/2002) InDiCo : the European digital conferencing project. (CERN Bulletin 42/2002) CMS : superconducting cable production Diaporama

  10. CERN in "Nature"

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    CERN is nestled within a verdant natural environment which, thanks to a conservation-oriented policy, is characterized by a remarkable biodiversity. The continued protection of that diversity calls for thoughtful, carefully planned measures.   CERN’s site is an extensive one: its 650 hectares include 210 hectares of buildings, roadways and parking lots, 100 hectares of fenced-off green area, and 340 hectares of non-fenced land, a patchwork of fields, woods and pasture. This land teems with a great variety of plants and animals, including some rare and unexpected species. In 2009 CERN received a certificate from the Swiss foundation Nature & économie for the Meyrin site, and the award was renewed in 2012 for three more years. “The green spaces inside the fenced area are tended by six ISS gardeners, whose duties also include keeping the sidewalks and footpaths clear of snow in winter. The Meyrin site also includes orchid sanctuaries, meadows and sheep pasture...

  11. CERN Record Club

    CERN Multimedia

    CERN Record club

    2015-01-01

    Over 2000 DVDs Now Available If you were a member last year, please come along and renew your membership for just 20.- and check out the latest additions, the list is at http://crc.web.cern.ch/crc/public/disc.php?action=search&month=2015/01. If you are not a member, why not come along and have a look, we now have over 2000 DVDs on display covering Action films, Suspense, Drama, Comedy, Sci fi and Childrens. The full catalogue can be consulted at http://cern.ch/crc and for 20.- membership you have access to all of them. There is also a CD selection, Classical music, Jazz and popular; it is not on display but the catalogue is online and you can select what you want and come to the club to collect it. We are open from 12:30 to 13:00 on Mondays, Wednesdays and Fridays and the Club Room is in Restaurant 2, Building 504, near the UBS ATM. We look forward to seeing you.

  12. Industrial services at CERN

    CERN Multimedia

    2002-01-01

    The Bulletin looks at industrial services contracts and the real impact of the cost reductions at CERN. The level of industrial services contracts varies from one phase to another. For example, during the dismantling of LEP (photo) it rose substiantially to fall again at the end of dismantling. Industrial services contracts are an important resource for CERN. The level and nature of such contracts changes according to the phase of operation of the Laboratory. A construction phase, as for the LHC, requires a higher level of industrial services contracts compared with a period of normal running. During the operation of LEP, industrial services contracts were thus maintained at a level of 120 MCHF per year. The level rose to 156 MCHF in 2001 to include contracts awarded for dismantling LEP, and fell to about 144 MCHF in 2002 when the dismantling was complete. During the whole LHC construction period, up to 2007, industrial services spending will be stable in the range 135-140 MCHF per year. For the running pe...

  13. Kayak CERN Club

    CERN Multimedia

    Kayak CERN Club

    2014-01-01

                            Canoë Kayak CERN (CKC) Mikko Karppinen Vainqueur de la Maxi Kayak Pour la première édition de la course maxi kayak d’Annecy dimanche 1er juin, organisée par l’association Kayak sans Frontières, trois membres du Canoë Kayak CERN prenaient le départ de la boucle de 34kms autour du lac, Nicolas Roget qui après 23kms d’effort dû abandonner suite à plusieurs dessalages dans la partie la plus mouvementée du lac, René Dague franchissait la ligne d’arrivée après 3h15 de course se classant à la 10ème place juste devant l’ancien champion du monde de slalom Jacques Calori...

  14. Disk storage at CERN

    CERN Document Server

    Mascetti, L; Chan, B; Espinal, X; Fiorot, A; Labrador, H Gonz; Iven, J; Lamanna, M; Presti, G Lo; Mościcki, JT; Peters, AJ; Ponce, S; Rousseau, H; van der Ster, D

    2015-01-01

    CERN IT DSS operates the main storage resources for data taking and physics analysis mainly via three system: AFS, CASTOR and EOS. The total usable space available on disk for users is about 100 PB (with relative ratios 1:20:120). EOS actively uses the two CERN Tier0 centres (Meyrin and Wigner) with 50:50 ratio. IT DSS also provide sizeable on-demand resources for IT services most notably OpenStack and NFS-based clients: this is provided by a Ceph infrastructure (3 PB) and few proprietary servers (NetApp). We will describe our operational experience and recent changes to these systems with special emphasis to the present usages for LHC data taking, the convergence to commodity hardware (nodes with 200-TB each with optional SSD) shared across all services. We also describe our experience in coupling commodity and home-grown solution (e.g. CERNBox integration in EOS, Ceph disk pools for AFS, CASTOR and NFS) and finally the future evolution of these systems for WLCG and beyond.

  15. The colours of CERN

    CERN Multimedia

    Laëtitia Pedroso

    2010-01-01

    Would you move into an office painted in a colour you hate? As we all know, taste in colour is individual. Thanks to the establishment of a new Painting Charter, conflicting opinions will be unified.   The four new paint colours established in the Painting Charter. There were many reasons behind the creation of the Painting Charter by the GS SEM Department. Unlike many companies, CERN has not until now regulated which colours can be used inside buildings. With many nationalities passing through CERN, tastes tend to differ: northern countries usually prefer colder colours, while southern countries seem to prefer warm colours. It’s not hard to imagine how quickly we could make a rainbow! In addition, whenever an office needs to be repainted, it can be difficult to find exactly the same colour. This results in entire walls being repainted, which increases the cost. If – by chance – the original colour is found, it could be out of stock. While ...

  16. CERN Yachting club

    CERN Multimedia

    CERN Yachting club

    2015-01-01

    Surely among the most active sports clubs within CERN, the Yachting Club has had a steadily increasing membership over a decade; it is now around 350 but new members are always welcome, especially now at the beginning of a season. Indeed, with the Lottery for places in courses which are one of our highlights, membership has jumped since mid-March. The Lottery is always heavily oversubscribed, which we like to think represents its good reputation for quality of teaching and good fun at the same time. Now those lucky new students are in contact with their teachers, will be buying wetsuits in some cases (dinghy and catamaran courses), joining us for the launch of the fleet (see calendar on website at http://yachting.web.cern.ch/yachting/ycc_home.html ) and  – in many cases – learning sailing as complete beginners. Those Lottery-unlucky can still plan a fun season, with our Thursday Practice evenings, where we can almost always place everyone on a boat for an outing.   ...

  17. Italy at CERN

    CERN Multimedia

    Caroline Laignel

    2005-01-01

    15 - 17 November 2005 Main Building Bldg 60 - ground and 1st floor 09:00 - 17:30 Twenty-six companies will present their latest technology at the "Italy at CERN" exhibition. Italian industry will exhibit products and technologies which are related to the field of particle physics.The main subjects are: electrical engineering, electronics, logistics, mechanical engineering, vacuum and low-temperature technology. The exhibition is being organised by the INFN in Padua.The exhibitors are listed below.A detailed programme will be available in due course : from your Departmental secretariat, at the exhibition, on the FI homepage http://fi-dep.web.cern.ch/fi-dep/structure/memberstates/exhibitions_visits.htm LIST OF EXHIBITORS  Ansaldo Superconduttori Spa CAEN Spa CECOM Snc Consorzio Canavese Export CPE Italia Spa Criotec Impianti Srl CTE Sistemi Srl Carpenteria S. Antonio Spa E.E.I. Equipaggiamenti Elettronici Industriali Elettronica Conduttori Srl Goma Elettronica Spa ICAR Spa Intercond Spa Kenotec Srl O...

  18. France at CERN

    CERN Multimedia

    GS Department

    2010-01-01

    Industrial Exhibition Administration Building Bldg 61 Tuesday 8 June: 9 a.m. – 5.30 p.m. Wednesday 9 June: 9 a.m. – 4 p.m. “FRANCE AT CERN” – INDUSTRIAL EXHIBITION Thirty-six French companies are presenting their latest technological advances during the industrial exhibition "France at CERN", featuring products and technologies specifically related to the activities of the CERN facility. Presenting their know-how in electric vehicles, PSA - PEUGEOT/CITROEN are sponsoring the event. Seminars will be hold in the Main Building’s conference rooms: R&D innovation strategy in Pôle Nucléaire Bourgogne (08/06/2010 – 13h) MU by Peugeot (08/06/2010 – 14h) Citroën (08/06/2010 – 15h) « Elément 14 » : a unique design engineer community for sharing Electronic Engineering Solutions (09/06/2010 – 11h) Individual B2B meetin...

  19. EUCYS prizewinner visits CERN

    CERN Multimedia

    Jennifer Toes

    2016-01-01

    Young Turkish student Baris Volkan Gürses visited CERN from 4 to 8 July after winning the prize in the 2015 European Contest for Young Scientists (EUCYS).    Baris Volkan Gürses, EUCYS prizewinner, visiting the Microcosm. After winning both regional and national competitions in Turkey, 18-year-old student Baris Volkan Gürses competed against 169 young scientists and was awarded a visit to CERN by EIROforum for his physics project in EUCYS 2015. His project, entitled “Generation of artificial gravity by using electrostatic force for prevention of muscle atrophy and osteoporosis occurring in gravity-free environments”, focused on the design of a mechanism to help with the impact of spaceflight on the human body. “My objective was to eliminate the negative effects of a gravity-free environment on astronauts who stay in space for longer periods of time, like in the International Space Station,” explained Volkan. &...

  20. Kofi Annan visits CERN

    CERN Multimedia

    Katarina Anthony

    2011-01-01

    On Tuesday 13 September, former Secretary-General of the United Nations and Nobel Peace Laureate Kofi Annan paid a visit to CERN.   Arriving in the early afternoon, Kofi Annan and his family were greeted by Director-General Rolf Heuer on the steps of Building 500. After a quick introduction to the Laboratory, they were whisked off to SM18 for a tour of the LHC’s superconducting magnet test hall, guided by Technology Department Head Frédérick Bordry. After a light lunch in Restaurant 2, Kofi Annan added his signature to CERN’s Guest Book. He is the second UN Secretary-General to add their name to CERN’s roster; his successor Ban Ki-Moon’s visited CERN in 2008.  Kofi Annan was then guided by spokesperson Fabiola Gianotti on a tour of ATLAS’s Visitor Centre. This was an opportunity for some of the younger members of the ATLAS collaboration to meet the former Secretary-General and to answer his questions about the exper...