WorldWideScience

Sample records for central receiver power plants

  1. Hybrid solar central receiver for combined cycle power plant

    Energy Technology Data Exchange (ETDEWEB)

    Bharathan, Desikan (Lakewood, CO); Bohn, Mark S. (Golden, CO); Williams, Thomas A. (Arvada, CO)

    1995-01-01

    A hybrid combined cycle power plant including a solar central receiver for receiving solar radiation and converting it to thermal energy. The power plant includes a molten salt heat transfer medium for transferring the thermal energy to an air heater. The air heater uses the thermal energy to preheat the air from the compressor of the gas cycle. The exhaust gases from the gas cycle are directed to a steam turbine for additional energy production.

  2. Hybrid solar central receiver for combined cycle power plant

    Science.gov (United States)

    Bharathan, D.; Bohn, M.S.; Williams, T.A.

    1995-05-23

    A hybrid combined cycle power plant is described including a solar central receiver for receiving solar radiation and converting it to thermal energy. The power plant includes a molten salt heat transfer medium for transferring the thermal energy to an air heater. The air heater uses the thermal energy to preheat the air from the compressor of the gas cycle. The exhaust gases from the gas cycle are directed to a steam turbine for additional energy production. 1 figure.

  3. Central receiver power plant: an environmental, ecological, and socioeconomic analysis

    Energy Technology Data Exchange (ETDEWEB)

    Davison, M.; Grether, D.

    1977-06-01

    The technical details of the central receiver design are reviewed. Socio-economic questions are considered including: market penetration, air industrial sector model, demands on industry, employment, effluents associated with manufacture of components, strains due to intensive construction, water requirements, and land requirements. The ecological effects in the vicinity of the central receiver plant site are dealt with, with emphasis on effects on land surface, mammals, and reptiles and amphibians. Climatological considerations are reviewed including: desert types, effects of surface albedo modification, effects of aerosols, effects on evaporation rates, the heliostat canopy, effects on turbulent transfer rates, effects on the wind profile, a model of convection about a central receiver plant, and a global scenario. Drawings of heliostat and plant design are included in appendices. (MHR)

  4. Baseload Nitrate Salt Central Receiver Power Plant Design Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Tilley, Drake [Abengoa Solar LLC, Lakewood, CO (United States); Kelly, Bruce [Abengoa Solar LLC, Lakewood, CO (United States); Burkholder, Frank [Abengoa Solar LLC, Lakewood, CO (United States)

    2014-12-12

    The objectives of the work were to demonstrate that a 100 MWe central receiver plant, using nitrate salt as the receiver coolant, thermal storage medium, and heat transport fluid in the steam generator, can 1) operate, at full load, for 6,400 hours each year using only solar energy, and 2) satisfy the DOE levelized energy cost goal of $0.09/kWhe (real 2009 $). To achieve these objectives the work incorporated a large range of tasks relating to many different aspects of a molten salt tower plant. The first Phase of the project focused on developing a baseline design for a Molten Salt Tower and validating areas for improvement. Tasks included a market study, receiver design, heat exchanger design, preliminary heliostat design, solar field optimization, baseline system design including PFDs and P&IDs and detailed cost estimate. The baseline plant met the initial goal of less than $0.14/kWhe, and reinforced the need to reduce costs in several key areas to reach the overall $0.09/kWhe goal. The major improvements identified from Phase I were: 1) higher temperature salt to improve cycle efficiency and reduce storage requirements, 2) an improved receiver coating to increase the efficiency of the receiver, 3) a large receiver design to maximize storage and meet the baseload hours objective, and 4) lower cost heliostat field. The second Phase of the project looked at advancing the baseline tower with the identified improvements and included key prototypes. To validate increasing the standard solar salt temperature to 600 °C a dynamic test was conducted at Sandia. The results ultimately proved the hypothesis incorrect and showed high oxide production and corrosion rates. The results lead to further testing of systems to mitigate the oxide production to be able to increase the salt temperature for a commercial plant. Foster Wheeler worked on the receiver design in both Phase I and Phase II looking at both design and lowering costs utilizing commercial fossil boiler

  5. Thermal, performance and economic analysis of solar thermal central receiver power plants

    International Nuclear Information System (INIS)

    This paper presents the results of modeling the thermal performance and economic feasibility of large (utility scale) and small solar thermal central receiver power plants. Five options have been studied: molten nitrate salt external central receiver (CR) with molten salt storage, molten nitrate salt cavity CR with salt storage, sodium external CR with sodium storage, sodium external CR with salt storage, water/steam external CR with oil/rock storage. Each option is analyzed over a range of plant power ratings from 1 MWe to 100 MWe and over a range of capacity factors. 12 figs., 4 tabs., 6 refs

  6. The design of future central receiver power plants based on lessons learned from the Solar One Pilot Plant

    Science.gov (United States)

    Kolb, G. J.

    The 10-MW(sub e) Solar One Pilot Plant was the world's largest solar central receiver power plant. During its power production years it delivered over 37,000 MWhrs (net) to the utility grid. In this type of electric power generating plant, large sun-tracking mirrors called heliostats reflect and concentrate sunlight onto a receiver mounted on top of a tower. The receiver transforms the solar energy into thermal energy that heats water, turning it into superheated steam that drives a turbine to generate electricity. The Solar One Pilot Plant successfully demonstrated the feasibility of generating electricity with a solar central receiver power plant. During the initial 2 years the plant was tested and 4 years the plant was operated as a power plant, a great deal of data was collected relating to the efficiency and reliability of the plant's various systems. This paper summarizes these statistics and compares them to goals developed by the U.S. Department of Energy. Based on this comparison, improvements in the design and operation of future central receiver plants are recommended. Research at Sandia National Laboratories and the U.S. utility industry suggests that the next generation of central receiver power plants will use a molten salt heat transfer fluid rather than water/steam. Sandia has recently completed the development of the hardware needed in a molten salt power plant. Use of this new technology is expected to solve many of the performance problems encountered at Solar One. Projections for the energy costs from these future central receiver plants are also presented. For reference, these projections are compared to the current energy costs from the SEGS parabolic trough plants now operating in Southern California.

  7. The design of future central receiver power plants based on lessons learned from the Solar One Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kolb, G.J.

    1991-01-01

    The 10-MW{sub e} Solar One Pilot Plant was the world's largest solar central receiver power plant. During its power production years it delivered over 37,000 MWhrs (net) to the utility grid. In this type of electric power generating plant, large sun-tracking mirrors called heliostats reflect and concentrate sunlight onto a receiver mounted on top a of a tower. The receiver transforms the solar energy into thermal energy that heats water, turning it into superheated steam that drives a turbine to generate electricity. The Solar One Pilot Plant successfully demonstrated the feasibility of generating electricity with a solar central receiver power plant. During the initial 2 years the plant was tested and 4 years the plant was operated as a power plant, a great deal of data was collected relating to the efficiency and reliability of the plant's various systems. This paper summarizes these statistics and compares them to goals developed by the US Department of Energy. Based on this comparison, improvements in the design and operation of future central receiver plants are recommended. Research at Sandia National Laboratories and the US utility industry suggests that the next generation of central receiver power plants will use a molten salt heat transfer fluid rather than water/steam. Sandia has recently completed the development of the hardware needed in a molten salt power plant. Use of this new technology is expected to solve many of the performance problems encountered at Solar One. Projections for the energy costs from these future central receiver plants are also presented. For reference, these projections are compared to the current energy costs from the SEGS parabolic trough plants now operating in Southern California.

  8. Thermoeconomic optimization of a Kalina cycle for a central receiver concentrating solar power plant

    DEFF Research Database (Denmark)

    Modi, Anish; Kærn, Martin Ryhl; Andreasen, Jesper Graa;

    2016-01-01

    Concentrating solar power plants use a number of reflecting mirrors to focus and convert the incident solar energy to heat, and a power cycle to convert this heat into electricity. This paper evaluates the use of a high temperature Kalina cycle for a central receiver concentrating solar power plant...... and the economic perspectives, the results suggest that it is not beneficial to use the Kalina cycle for high temperature concentrating solar power plants....... with direct vapour generation and without storage. The use of the ammonia-water mixture as the power cycle working fluid with non-isothermal evaporation and condensation presents the potential to improve the overall performance of the plant. This however comes at a price of requiring larger heat exchangers...

  9. Transient analysis of a molten salt central receiver (MSCR) in a solar power plant

    Science.gov (United States)

    Joshi, A.; Wang, C.; Akinjiola, O.; Lou, X.; Neuschaefer, C.; Quinn, J.

    2016-05-01

    Alstom is developing solar power tower plants utilizing molten salt as the working fluid. In solar power tower, the molten salt central receiver (MSCR) atop of the tower is constructed of banks of tubes arranged in panels creating a heat transfer surface exposed to the solar irradiation from the heliostat field. The molten salt heat transfer fluid (HTF), in this case 60/40%wt NaNO3-KNO3, flows in serpentine flow through the surface collecting sensible heat thus raising the HTF temperature from 290°C to 565°C. The hot molten salt is stored and dispatched to produce superheated steam in a steam generator, which in turn produces electricity in the steam turbine generator. The MSCR based power plant with a thermal energy storage system (TESS) is a fully dispatchable renewable power plant with a number of opportunities for operational and economic optimization. This paper presents operation and controls challenges to the MSCR and the overall power plant, and the use of dynamic model computer simulation based transient analyses applied to molten salt based solar thermal power plant. This study presents the evaluation of the current MSCR design, using a dynamic model, with emphasis on severe events affecting critical process response, such as MS temperature deviations, and recommend MSCR control design improvements based on the results. Cloud events are the scope of the transient analysis presented in this paper. The paper presents results from a comparative study to examine impacts or effects on key process variables related to controls and operation of the MSCR plant.

  10. Final report on the power production phase of the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Radosevich, L.G.

    1988-03-01

    This report describes the evaluations of the power production testing of Solar One, the 10 MW/sub e/ Solar Thermal Central Receiver Pilot Plant near Barstow, California. The Pilot Plant, a cooperative project of the US Department of Energy and utility firms led by the Southern California Edison Company, began a three year period of power production operation in August 1984. During this period, plant performance indicators, such as capacity factor, system efficiency, and availability, were studied to assess the operational capability of the Pilot Plant to reliably supply electrical power. Also studied was the long-term performance of such key plant components as the heliostats and the receiver. During the three years of power production, the Pilot Plant showed an improvement in performance. Considerable increases in capacity factor, system efficiency, and availability were achieved. Heliostat operation was reliable, and only small amounts of mirror corrosion were observed. Receiver tube leaks did occur, however, and were the main cause of the plant's unscheduled outages. The Pilot Plant provided valuable lessons which will aid in the design of future solar central receiver plants. 53 refs., 46 figs., 4 tabs.

  11. Optimisation of a Kalina cycle for a central receiver solar thermal power plant with direct steam generation

    DEFF Research Database (Denmark)

    Modi, Anish; Haglind, Fredrik

    2014-01-01

    Central receiver solar thermal power plants are regarded as one of the promising ways to generate electricity in near future. They offer the possibility of using high temperatures and pressures to achieve high efficiencies with standard power cycles. A direct steam generation approach can be used...... for a central receiver solar thermal power plant with direct steam generation. The variation in the cycle performance with respect to the turbine inlet ammonia mass fraction and pressure and a comparison of the initial investment with that of the basic Rankine cycle are also presented. Only high live steam...... for such plants for improved performance. This approach can also be combined with using advanced power cycles like the Kalina cycle, which uses a zeotropic mixture of ammonia and water instead of pure water as the working fluid. This paper presents the optimisation of a particular Kalina cycle layout...

  12. Preliminary design of the Carrisa Plains solar central receiver power plant. Volume II. Plant specifications

    Energy Technology Data Exchange (ETDEWEB)

    Price, R. E.

    1983-12-31

    The specifications and design criteria for all plant systems and subsystems used in developing the preliminary design of Carrisa Plains 30-MWe Solar Plant are contained in this volume. The specifications have been organized according to plant systems and levels. The levels are arranged in tiers. Starting at the top tier and proceeding down, the specification levels are the plant, system, subsystem, components, and fabrication. A tab number, listed in the index, has been assigned each document to facilitate document location.

  13. Performance analysis of a Kalina cycle for a central receiver solar thermal power plant with direct steam generation

    DEFF Research Database (Denmark)

    Modi, Anish; Haglind, Fredrik

    2014-01-01

    Solar thermal power plants have attracted increasing interest in the past few years - with respect to both the design of the various plant components, and extending the operation hours by employing different types of storage systems. One approach to improve the overall plant efficiency is to use...... without corroding the equipment by using suitable additives with the mixture. The purpose of the study reported here was to investigate if there is any benefit of using a Kalina cycle for a direct steam generation, central receiver solar thermal power plant with high live steam temperature (450 C...... direct steam generation with water/steam as both the heat transfer fluid in the solar receivers and the cycle working fluid. This enables operating the plant with higher turbine inlet temperatures. Available literature suggests that it is feasible to use ammonia-water mixtures at high temperatures...

  14. Conceptual design of Advanced Central Receiver Power Systems sodium-cooled receiver concept: development plan and pilot plant description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-03-01

    This volume encompasses Task 6 of the Phase I effort on the Advanced Central Receiver. This task included developing a plan to bring the commercial plant conceptual design into being. The base version of the plan includes a pilot plant to be designed and constructed during Phases II and III, three subsystem research experiments to be performed during Phase II, and the design and construction of a commercial demonstration plant. These plans are discussed in detail, as well as several options which could reduce both cost and schedule to achieve the overall goal of a commercial-sized demonstration plant. In evaluating pilot plant characeristics, emphasis was placed on representing commercial plant receiver characteristics and total system operation. In considering total system operation, it was recognized that a water-steam pilot plant would already be in operation, hence certain systems will already have been tested. Several receiver configurations were investigated consisting of from one to five full-size panels, with the objective of representing peak north side power for a 100-MWe plant as well as the peak flux vaue of about 1.4 MW/m/sup 2/. This goal was accomplished with a 5-panel receiver; however, the power to the edge panels is very low. Hence, with little loss, these panels can be eliminated to give a 3-panel configuration. The total absorbed thermal power is about 38 MWt, which is sufficient for about 10 MWe. A plant of this size is described.

  15. Power and Efficiency Analysis of a Solar Central Receiver Combined Cycle Plant with a Small Particle Heat Exchanger Receiver

    Science.gov (United States)

    Virgen, Matthew Miguel

    Two significant goals in solar plant operation are lower cost and higher efficiencies. To achieve those goals, a combined cycle gas turbine (CCGT) system, which uses the hot gas turbine exhaust to produce superheated steam for a bottoming Rankine cycle by way of a heat recovery steam generator (HRSG), is investigated in this work. Building off of a previous gas turbine model created at the Combustion and Solar Energy Laboratory at SDSU, here are added the HRSG and steam turbine model, which had to handle significant change in the mass flow and temperature of air exiting the gas turbine due to varying solar input. A wide range of cases were run to explore options for maximizing both power and efficiency from the proposed CSP CCGT plant. Variable guide vanes (VGVs) were found in the earlier model to be an effective tool in providing operational flexibility to address the variable nature of solar input. Combined cycle efficiencies in the range of 50% were found to result from this plant configuration. However, a combustor inlet temperature (CIT) limit leads to two distinct Modes of operation, with a sharp drop in both plant efficiency and power occurring when the air flow through the receiver exceeded the CIT limit. This drawback can be partially addressed through strategic use of the VGVs. Since system response is fully established for the relevant range of solar input and variable guide vane angles, the System Advisor Model (SAM) from NREL can be used to find what the actual expected solar input would be over the course of the day, and plan accordingly. While the SAM software is not yet equipped to model a Brayton cycle cavity receiver, appropriate approximations were made in order to produce a suitable heliostat field to fit this system. Since the SPHER uses carbon nano-particles as the solar absorbers, questions of particle longevity and how the particles might affect the flame behavior in the combustor were addressed using the chemical kinetics software Chemkin

  16. Performance analysis of a Kalina cycle for a central receiver solar thermal power plant with direct steam generation

    International Nuclear Information System (INIS)

    Solar thermal power plants have attracted increasing interest in the past few years – with respect to both the design of the various plant components, and extending the operation hours by employing different types of storage systems. One approach to improve the overall plant efficiency is to use direct steam generation with water/steam as both the heat transfer fluid in the solar receivers and the cycle working fluid. This enables operating the plant with higher turbine inlet temperatures. Available literature suggests that it is feasible to use ammonia-water mixtures at high temperatures without corroding the equipment by using suitable additives with the mixture. The purpose of the study reported here was to investigate if there is any benefit of using a Kalina cycle for a direct steam generation, central receiver solar thermal power plant with high live steam temperature (450 °C) and pressure (over 100 bar). Thermodynamic performance of the Kalina cycle in terms of the plant exergy efficiency was evaluated and compared with a simple Rankine cycle. The rates of exergy destruction for the different components in the two cycles were also calculated and compared. The results suggest that the simple Rankine cycle exhibits better performance than the Kalina cycle when the heat input is only from the solar receiver. However, when using a two-tank molten-salt storage system as the primary source of heat input, the Kalina cycle showed an advantage over the simple Rankine cycle because of about 33 % reduction in the storage requirement. The solar receiver showed the highest rate of exergy destruction for both the cycles. The rates of exergy destruction in other components of the cycles were found to be highly dependent on the amount of recuperation, and the ammonia mass fraction and pressure at the turbine inlet. - Highlights: •Kalina cycle for a central receiver solar thermal power plant with direct steam generation. •Rankine cycle shows better plant exergy

  17. Preliminary design of the Carrisa Plains solar central receiver power plant. Volume III, Book 1. Design description

    Energy Technology Data Exchange (ETDEWEB)

    1983-12-31

    The design of the 30 MWe central receiver solar power plant to be located at Carrisa Plains, San Luis Obispo County, California, is summarized. The plant uses a vertical flat-panel (billboard solar receiver located at the top of a tower to collect solar energy redirected by approximately 1900 heliostats located to the north of the tower. The solar energy is used to heat liquid sodium pumped from ground level from 610 to 1050/sup 0/F. The power conversion system is a non-reheat system, cost-effective at this size level, and designed for high-efficiency performance in an application requiring daily startup. Successful completion of this project will lead to power generation starting in 1986. This report discusses in detail the design of the collector system, heat transport system, thermal storage subsystem, heat transport loop, steam generation subsystem, electrical, instrumentation, and control systems, power conversion system, master control system, and balance of plant. The performance, facility cost estimate and economic analysis, and development plan are also discussed.

  18. Evaluation of annual efficiencies of high temperature central receiver concentrated solar power plants with thermal energy storage.

    Energy Technology Data Exchange (ETDEWEB)

    Ehrhart, Brian David; Gill, David Dennis

    2013-07-01

    The current study has examined four cases of a central receiver concentrated solar power plant with thermal energy storage using the DELSOL and SOLERGY computer codes. The current state-of-the-art base case was compared with a theoretical high temperature case which was based on the scaling of some input parameters and the estimation of other parameters based on performance targets from the Department of Energy SunShot Initiative. This comparison was done for both current and high temperature cases in two configurations: a surround field with an external cylindrical receiver and a north field with a single cavity receiver. There is a fairly dramatic difference between the design point and annual average performance, especially in the solar field and receiver subsystems, and also in energy losses due to the thermal energy storage being full to capacity. Additionally, there are relatively small differences (<2%) in annual average efficiencies between the Base and High Temperature cases, despite an increase in thermal to electric conversion efficiency of over 8%. This is due the increased thermal losses at higher temperature and operational losses due to subsystem start-up and shut-down. Thermal energy storage can mitigate some of these losses by utilizing larger thermal energy storage to ensure that the electric power production system does not need to stop and re-start as often, but solar energy is inherently transient. Economic and cost considerations were not considered here, but will have a significant impact on solar thermal electric power production strategy and sizing.

  19. ERDA's central receiver solar thermal power system studies

    Science.gov (United States)

    Lippy, L. J.; Heaton, T. R.

    1977-01-01

    The utilization of solar energy for electrical power production was studied. Efforts underway on the central receiver solar thermal power system are presented. Preliminary designs are included of pilot plant utilizing large numbers of heliostats in a collector field. Safety hazards are also discussed, as well as the most beneficial location of such a plant within the United States.

  20. Central receiver solar thermal power system, Phase 1: CDRL Item 2, pilot plant preliminary design report. Volume VII. Pilot plant cost and commercial plant cost and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1980-05-01

    Detailed cost and performance data for the proposed tower focus pilot plant and commercial plant are given. The baseline central receiver concept defined by the MDAC team consists of the following features: (A) an external receiver mounted on a tower, and located in a 360/sup 0/ array of sun-tracking heliostats which comprise the collector subsystem. (B) feedwater from the electrical power generation subsystem is pumped through a riser to the receiver, where the feedwater is converted to superheated steam in a single pass through the tubes of the receiver panels. (C) The steam from the receiver is routed through a downcomer to the ground and introduced to a turbine directly for expansion and generation of electricity, and/or to a thermal storage subsystem, where the steam is condensed in charging heat exchangers to heat a dual-medium oil and rock thermal storage unit (TSU). (D) Extended operation after daylight hours is facilitated by discharging the TSU to generate steam for feeding the admission port of the turbine. (E) Overall control of the system is provided by a master control unit, which handles the interactions between subsystems that take place during startup, shutdown, and transitions between operating modes. (WHK)

  1. Preliminary design of the Carrisa Plains solar central receiver power plant. Volume III, Book 3. Appendices. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S. K.

    1983-12-31

    The auxiliary heat transport systems of the Carrisa Plains Solar Power Plant (CPSPP) comprise facilities which are used to support plant operation and provide plant safety and maintenance. The facilities are the sodium purification system, argon cover gas system, sodium receiving and filling system, sodium-water reaction product receiving system, and safety and maintenance equipment. The functions of the facilities of the auxiliary system are described. Design requirements are established based on plant operating parameters. Descriptions are given on the system which will be adequate to perform the function and satisfy the requirements. Valve and equipment lists are included in the appendix.

  2. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 4. Commercial and pilot plant cost data. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    This volume of the advanced central receiver final report presents the cost data using the cost breakdown structure identified in the preliminary specification. Cost summaries are presented in the following sections for the 100-MWe and 281-MWe commercial plant and a 10-MWe pilot plant. Cost substantiation data for this volume are presented in the appendices. Other cost summary data include Nth plant data for the 100-MWe and 281-MWe commercial plants, and a summary for the alternative concept air-rock storage system. The main description of the plant costing technique occurs as part of Section II for the 100-MWe baseline concept.

  3. Central Receiver Solar Thermal Power System, Phase 1: CDRL Item 2, Pilot plant preliminary design report. Volume 1. Executive overview

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    This summary introduces the McDonnell Douglas Astronautics Company (MDAC) Central Receiver System Preliminary Design and reports the results of the Subsystem Research Experiments (SRE) recently completed. The baseline central receiver concept defined by the MDAC team consists of the following features: (A) An external receiver mounted on a tower, and located in a 360-deg array of sun-tracking heliostats which comprise the collector subsystem. (B) Feedwater from the electrical power generation subsystem is pumped through a riser to the receiver, where the feedwater is converted to superheated steam in a single pass through the tubes of the receiver panels. (C) The steam from the receiver is routed through a downcomer to the ground and introduced to a turbine directly for expansion and generation of electricity, and/or to a thermal storage subsystem, where the steam is condensed in charging heat exchangers to heat a dual-medium oil and rock thermal storage unit (TSU). (D) Extended operation after daylight hours is facilitated by discharging the TSU to generate steam for feeding the admission port of the turbine. (E) Overall control of the system is provided by a master control unit, which handles the interactions between subsystems that take place during startup, shutdown, and transitions between operating modes.

  4. Preliminary design of the Carrisa Plains solar central receiver power plant. Volume III, Book 3. Appendices, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Mouradian, E. M.

    1983-12-31

    Thermal analyses for the preliminary design phase of the Receiver of the Carrizo Plains Solar Power Plant are presented. The sodium reference operating conditions (T/sub in/ = 610/sup 0/F, T/sub out/ = 1050/sup 0/F) have been considered. Included are: Nominal flux distribution on receiver panal, Energy input to tubes, Axial temperature distribution; sodium and tubes, Sodium flow distribution, Sodium pressure drop, orifice calculations, Temperature distribution in tube cut (R-0), Backface structure, and Nonuniform sodium outlet temperature. Transient conditions and panel front face heat losses are not considered. These are to be addressed in a subsequent design phase. Also to be considered later are the design conditions as variations from the nominal reference (operating) condition. An addendum, designated Appendix C, has been included describing panel heat losses, panel temperature distribution, and tube-manifold joint thermal model.

  5. Conceptual design of advanced central receiver power system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Tracey, T. R.

    1978-09-01

    The design of a 300 MWe tower focus power plant which uses molten salt heat transfer fluids and sensible heat storage is described in detail. The system consists of nine heliostat fields with 7711 heliostats in each. Four cavity receivers are located at the top of a 155-meter tower. Tasks include: (1) review and analysis of preliminary specification; (2) parametric analysis; (3) selection of preferred configuration; (4) commercial plant conceptual design; (5) assessment of commercial-sized advanced central power system; (6) development plan; (7) program plan; (8) reports and data; (9) program management; (10) safety analysis; and (11) material study and test program. (WHK)

  6. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 2, Book 1. Commercial plant conceptual design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    The conceptual design of the 100-MW solar tower focus commercial power plant is described in detail. Sodium is pumped up to the top of a tall tower where the receiver is located. The sodium is heated in the receiver and then flows down the tower, through a pressure reducing device, and thence into a large, hot storage tank which is located at ground level and whose size is made to meet a specific thermal energy storage capacity requirement. From this tank, the sodium is pumped by a separate pump, through a system of sodium-to-water steam generators. The steam generator system consists of a separate superheater and reheater operating in parallel and an evaporator unit operating in series with the other two units. The sodium flowing from the evaporator unit is piped to a cold storage tank. From the cold storage tank, sodium is then pumped up to the tip of the tower to complete the cycle. The steam generated in the steam generators is fed to a conventional off-the-shelf, high-efficiency turbine. The steam loop operates in a conventional rankine cycle with the steam generators serving the same purpose as a conventional boiler and water being fed to the evaporator with conventional feedwater pumps. The pressure reducing device (a standard drag valve, for example) serves to mitigate the pressure caused by the static head of sodium and thus allows the large tanks to operate at ambient pressure conditions. (WHK)

  7. Central receiver solar thermal power system, Phase 1. CDRL Item 2. Pilot plant preliminary design report. Volume IV. Receiver subsystem. [10-MW Pilot Plant and 100-MW Commercial Plant

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-11-01

    The conception, design, and testing of the receiver subsystem proposed by the McDonnell Douglas/Rocketdyne Receiver team for the DOE 10-MW Pilot Plant and the 100-MW Commercial Plant are described. The receiver subsystem consists of the receiver unit, the tower on which the receiver unit is mounted above the collector field, and the supporting control and instrumentation equipment. The plans for implementation of the Pilot Plant are given including the anticipated schedule and production plan (procurement, installation, checkout, and maintenance). Specifications for the performance, design, and test requirements for the Pilot Plant receiver subsystem are included. (WHK)

  8. Solar central receiver reformer system for ammonia plants

    Science.gov (United States)

    1980-07-01

    An overview of a study to retrofit the Valley Nitrogen Producers, Inc., El Centro, California 600 ST/SD Ammonia Plant with Solar Central Receiver Technology is presented. The retrofit system consists of a solar central receiver reformer (SCRR) operating in parallel with the existing fossil fired reformer. Steam and hydrocarbon react in the catalyst filled tubes of the inner cavity receiver to form a hydrogen rich mixture which is the syngas feed for the ammonia production. The SCRR system will displace natural gas presently used in the fossil reformer combustion chamber.

  9. Financial study of commercialization of solar central receiver power systems

    Science.gov (United States)

    1981-03-01

    Commercialization requires that central receiver (CR) systems meet the economic criteria used by industry to select systems for capital ventures. Quantitative estimates are given of the investment required by government, utilities, and the manufacturing sector to meet the energy displacement goals for central receiver technology. Initial solar repowering and stand-alone electric utility plants will not have economic comparability with competitive energy sources. A major factor for this is that initial (first of a kind) heliostat costs will be high. As heliostat costs are reduced due to automated manufacturing economies, learning, and high volume production, central receiver technology will become more competitive. Under this task, several scenarios (0.1, 0.5, and 1.0 quad/y) were evaluated to determine the effect on commercial attractiveness and to determine the cost to government to bring about commercialization of solar central receivers.

  10. Central receiver solar thermal power system, Phase 1. Pilot plant cost and commercial plant cost and performance preliminary design report. [150 MW commercial tower focus plant and 10 MW pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Detailed cost and performance data for the 10 MWe Pilot Plant and the 150 MWe Commercial Plant are given. The Commercial Plant consists of 15 integrated collector - receiver modules. Each module contains 1325 heliostats and an internally mounted steam-generating receiver on a steel tower with an aperture height of 90 M. The Pilot Plant consists of one full-scale collector - receiver module. The two-stage sensible heat storage system utilizes a heat transfer salt medium and a hydrocarbon oil storage medium. The electric power generation system uses a conventional steam turbine-generator. The Pilot Plant is one module of the Commercial Plant, providing for one-to-one scaling in the most critical areas. (WHK)

  11. Solar Central Receiver Hybrid Power Systems sodium-cooled receiver concept. Final report. Volume III. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    The overall, long term objective of the Solar Central Receiver Hybrid Power System is to identify, characterize, and ultimately demonstrate the viability and cost effectiveness of solar/fossil, steam Rankine cycle, hybrid power systems that: (1) consist of a combined solar central receiver energy source and a nonsolar energy source at a single, common site, (2) may operate in the base, intermediate, and peaking capacity modes, (3) produce the rated output independent of variations in solar insolation, (4) provide a significant savings (50% or more) in fuel consumpton, and (5) produce power at the minimum possible cost in mills/kWh. It is essential that these hybrid concepts be technically feasible and economically competitive with other systems in the near to mid-term time period (1985-1990) on a commercial scale. The program objective for Phase I is to identify and conceptually characterize solar/fossil steam Rankine cycle, commercial-scale, power plant systems that are economically viable and technically feasible. This volume contains appendices to the conceptual design and systems analysis studies gien in Volume II, Books 1 and 2. (WHK)

  12. Computer programming to calculate the variations of characteristic angles of heliostats as a function of time and position in a central receiver solar power plant

    Energy Technology Data Exchange (ETDEWEB)

    Mehrabian, M.A.; Aseman, R.D. [Mechanical Engineering Dept., Shahid Bahonar Univ., Kerman (Iran, Islamic Republic of)

    2008-07-01

    The central receiver solar power plant is composed of a large number of individually stirred mirrors (heliostats), focusing the solar radiation onto a tower-mounted receiver. In this paper, an algorithm is developed based on vector geometry to pick an individual heliostat and calculate its characteristic angles at different times of the day and different days of the year. The algorithm then picks the other heliostats one by one and performs the same calculations as did for the first one. These data are used to control the orientation of heliostats for improving the performance of the field. This procedure is relatively straight-forward, and quite suitable for computer programming. The effect of major parameters such as shading and blocking on the performance of the heliostat field is also studied using this algorithm. The results of computer simulation are presented in three sections: (1) the characteristic angles of individual heliostats, (2) the incidence angle of the sun rays striking individual heliostats, and (3) the blocking and shading effect of each heliostat. The calculations and comparisons of results show that: (a) the average incidence angle in the northern hemisphere at the north side of the tower is less than that at its south side, (b) the cosine losses are reduced as the latitude is increased or the tower height is increased, (c) the blocking effect is more important in winter and its effect is much more noticeable than shading for large fields, (d) the height of the tower does not considerably affect shading; but significantly reduces the blocking effect, and (e) to have no blocking effect throughout the year, the field design should be performed for the winter solstice noon. (orig.)

  13. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 2, Book 2. Appendices. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    The appendices include: (A) design data sheets and P and I drawing for 100-MWe commercial plant design, for all-sodium storage concept; (B) design data sheets and P and I drawing for 100-MWe commercial plant design, for air-rock bed storage concept; (C) electric power generating water-steam system P and I drawing and equipment list, 100-MWe commercial plant design; (D) design data sheets and P and I drawing for 281-MWe commercial plant design; (E) steam generator system conceptual design; (F) heat losses from solar receiver surface; (G) heat transfer and pressure drop for rock bed thermal storage; (H) a comparison of alternative ways of recovering the hydraulic head from the advanced solar receiver tower; (I) central receiver tower study; (J) a comparison of mechanical and electromagnetic sodium pumps; (K) pipe routing study of sodium downcomer; and (L) sodium-cooled advanced central receiver system simulation model. (WHK)

  14. Calculation of flux density on receiver surface for the first Iranian solar power plant

    International Nuclear Information System (INIS)

    Flux density calculation for central receiver solar power plant is complicated and time consuming to do this calculation in the first Iranian central receiver solar power plant which is under construction in Taleghan, a special method is used that converts the problem from double Integral to two ordinary integrals. So, the complexity of computation is reduced considerably. At the end , a computer program simulates the method and computes flux density distribution and its maximum on the receiver surface which is necessary for receiver design

  15. Central receiver solar thermal power system, Phase 1. CDRL item 2. Pilot plant preliminary design report. Volume VI. Electrical power generation and master control subsystems and balance of plant

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    The requirements, performance, and subsystem configuration for both the Commercial and Pilot Plant electrical power generation subsystems (EPGS) and balance of plants are presented. The EPGS for both the Commercial Plant and Pilot Plant make use of conventional, proven equipment consistent with good power plant design practices in order to minimize risk and maximize reliability. The basic EPGS cycle selected is a regenerative cycle that uses a single automatic admission, condensing, tandem-compound double-flow turbine. Specifications, performance data, drawings, and schematics are included. (WHK)

  16. Central receiver solar thermal power system, phase 1. Progress report for period ending December 31, 1975

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-04-01

    The program objective is the preliminary design of a 10 MWe pilot solar power plant supported by major subsystem experiments. Progress is reported on the following task elements: 10 MWe pilot plant; collector subsystem design and analysis; receiver subsystem requirements; receiver subsystem design; thermal storage subsystem; electrical power generation subsystem; and pilot plant architectural engineering and support. (WDM)

  17. Concentrating Solar Power Central Receiver Panel Component Fabrication and Testing FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    McDowell, Michael W [Pratt & Whitney Rocketdyne; Miner, Kris [Pratt & Whitney Rocketdyne

    2013-03-30

    The objective of this project is to complete a design of an advanced concentrated solar panel and demonstrate the manufacturability of key components. Then confirm the operation of the key components under prototypic solar flux conditions. This work is an important step in reducing the levelized cost of energy (LCOE) from a central receiver solar power plant. The key technical risk to building larger power towers is building the larger receiver systems. Therefore, this proposed technology project includes the design of an advanced molten salt prototypic sub-scale receiver panel that can be utilized into a large receiver system. Then complete the fabrication and testing of key components of the receive design that will be used to validate the design. This project shall have a significant impact on solar thermal power plant design. Receiver panels of suitable size for utility scale plants are a key element to a solar power tower plant. Many subtle and complex manufacturing processes are involved in producing a reliable, robust receiver panel. Given the substantial size difference between receiver panels manufactured in the past and those needed for large plant designs, the manufacture and demonstration on prototype receiver panel components with representative features of a full-sized panel will be important to improving the build process for commercial success. Given the thermal flux limitations of the test facility, the panel components cannot be rendered full size. Significance changes occurred in the projects technical strategies from project initiation to the accomplishments described herein. The initial strategy was to define cost improvements for the receiver, design and build a scale prototype receiver and test, on sun, with a molten salt heat transport system. DOE had committed to constructing a molten salt heat transport loop to support receiver testing at the top of the NSTTF tower. Because of funding constraints this did not happen. A subsequent plan to

  18. Combined cycle solar central receiver hybrid power system study. Final technical report. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-11-01

    This study develops the conceptual design for a commercial-scale (nominal 100 MWe) central receiver solar/fossil fuel hybrid power system with combined cycle energy conversion. A near-term, metallic heat pipe receiver and an advanced ceramic tube receiver hybrid system are defined through parametric and market potential analyses. Comparative evaluations of the cost of power generation, the fuel displacement potential, and the technological readiness of these two systems indicate that the near-term hybrid system has better potential for commercialization by 1990. Based on the assessment of the conceptual design, major cost and performance improvements are projected for the near-term system. Constraints preventing wide-spread use were not identified. Energy storage is not required for this system and analyses show no economic advantages with energy storage provisions. It is concluded that the solar hybrid system is a cost effective alternative to conventional gas turbines and combined cycle generating plants, and has potential for intermediate-load market penetration at 15% annual fuel escalation rate. Due to their flexibility, simple solar/nonsolar interfacing, and short startup cycles, these hybrid plants have significant operating advantages. Utility company comments suggest that hybrid power systems will precede stand-alone solar plants.

  19. Central Receiver Solar Thermal Power System, Phase 1. CDRL Item 10. Final technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1978-05-01

    Results of analysis and design efforts by McDonnell Douglas Astronautics Company (MDAC), Rocketdyne, Stearns-Roger, Inc., Sheldahl, Inc., and the University of Houston between 1 July 1975 and 30 June 1977 are summarized. This is the Final Technical Progress Report published on the Phase 1 Central Receiver Solar Thermal Power System contract. Historical summaries and final selection of 10-MWe pilot plant and 100-MWe commercial systems are presented, with emphasis on the collector field characteristics, overall system performance, selection of steam/feedwater operating conditions, and rationale for system and subsystem selection. The commercial and pilot plant designs, as well as the subsystem research experiment activities for the collector, receiver, and thermal storage subsystems are presented, including a historical summary, design summary, and a description of the overall SRE test program and major test results for each of the subsystems.

  20. Central receiver solar thermal power system, Phase 1. CRDL Item 2. Pilot plant preliminary design report. Volume III, Book 2. Collector subsystem

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    The methods and plans for the manufacture of the 10-MW collector heliostats and associated controls for the pilot plant are detailed. An in-depth description of the production, installation, and verification testing of heliostats for the pilot plant is presented. Specifications for the performance, design, and test requirements for the pilot plant collector subsystem are included. Also, a heliostat location summary report is given. (WHK)

  1. Solar thermal central receivers

    International Nuclear Information System (INIS)

    Market issues, environmental impact, and technology issues related to the Solar Central Receiver concept are addressed. The rationale for selection of the preferred configuration and working fluid are presented as the result of a joint utility-industry analysis. A $30 million conversion of Solar One to an external molten salt receiver would provide the intermediate step to a commercial demonstration plant. The first plant in this series could produce electricity at 11.2 cents/kWhr and the seventh at 8.2 cents/kWhr, completely competitive with projected costs of new utility plants in 1992

  2. Monograph Series No. 3: 10 MWe Solar Thermal Central Receiver Pilot Plant receiver solar absorptance measurements and results

    Energy Technology Data Exchange (ETDEWEB)

    Baker, A.F.

    1986-06-01

    Solar absorptance data on Pyromark painted receiver panels at the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, California are reported. Measurements were made in 1982, 1983, and 1984. Selected measurements were made in 1985 after one receiver panel was repainted with Pyromark. The results show a linear decrease in the solar absorptance with time from an original average value of 0.92 to 0.88 after 663 days. The decrease in solar absorptance correlated with the higher incident solar flux levels on the receiver panels and not with the operating temperature of the panels. Repainting of one receiver panel successfully increased the solar absorptance to a value above 0.96.

  3. Bowmanville central switching plant for the Canadian power network

    International Nuclear Information System (INIS)

    The Darlington nuclear power station is sited about 80 km east of Toronto on the border of Lake Ontario. Commissioning is planned to be completed by 1992, and the plant will then own four units with 935 MW each, for power input to the eastwestern line of the 500 kV network of Ontario Hydro. The unit and plant auxiliary transformers of the power station are connected by 500 kV transmission lines with the Bowmanville central switching plant at a distance of 700 m. The collecting bar for the outgoing 500 kV overhead transmission lines is north of the switching plant. (orig.)

  4. Solar Pilot Plant, Phase I. Preliminary design report. Volume II, Book 2. Central receiver optical model users manual. CDRL item 2. [HELIAKI code

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-05-01

    HELIAKI is a FORTRAN computer program which simulates the optical/thermal performance of a central receiver solar thermal power plant for the dynamic conversion of solar-generated heat to electricity. The solar power plant which this program simulates consists of a field of individual sun tracking mirror units, or heliostats, redirecting sunlight into a cavity, called the receiver, mounted atop a tower. The program calculates the power retained by that cavity receiver at any point in time or the energy into the receiver over a year's time using a Monte Carlo ray trace technique to solve the multiple integral equations. An artist's concept of this plant is shown.

  5. A handbook for solar central receiver design

    Energy Technology Data Exchange (ETDEWEB)

    Falcone, P.K.

    1986-12-01

    This Handbook describes central receiver technology for solar thermal power plants. It contains a description and assessment of the major components in a central receiver system configured for utility scale production of electricity using Rankine-cycle steam turbines. It also describes procedures to size and optimize a plant and discussed examples from recent system analyses. Information concerning site selection criteria, cost estimation, construction, and operation and maintenance is also included, which should enable readers to perform design analyses for specific applications.

  6. Solar Central Receiver Hybrid Power Systems sodium-cooled receiver concept. Final report. Volume II, Book 2. Conceptual design, Sections 5 and 6

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    The overall, long-term objective of the Solar Central Receiver Hybrid Power System program is to identify, characterize, and ultimately demonstrate the viability and cost effectiveness of solar/fossil, steam Rankine cycle, hybrid power systems that: (1) consist of a combined solar central receiver energy source and a nonsolar energy source at a single, common site, (2) may operate in the base, intermediate, and peaking capacity modes, (3) produce the rated output independent of variations in solar insolation, (4) provide a significant savings (50% or more) in fuel consumption, and (5) produce power at the minimum possible cost in mills/kWh. It is essential that these hybrid concepts be technically feasible and economically competitive with other systems in the near to mid-term time period (1985-1990) on a commercial scale. The program objective for Phase I is to identify and conceptually characterize solar/fossil steam Rankine cycle, commercial-scale, power plant systems that are economically viable and technically feasible. This volume contains the detailed conceptual design and cost/performance estimates and an assessment of the commercial scale solar central receiver hybrid power system. (WHK)

  7. Solar central receiver hybrid power system, Phase I. Volume 3. Appendices. Final technical report, October 1978-August 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    A design study for a central receiver/fossil fuel hybrid power system using molten salts for heat transfer and heat storage is presented. This volume contains the appendices: (A) parametric salt piping data; (B) sample heat exchanger calculations; (C) salt chemistry and salt/materials compatibility evaluation; (D) heliostat field coordinates; (E) data lists; (F) STEAEC program input data; (G) hybrid receiver design drawings; (H) hybrid receiver absorber tube thermal math model; (I) piping stress analysis; (J) 100-MWe 18-hour storage solar central receiver hybrid power system capital cost worksheets; and (K) 500-MWe 18-hour solar central receiver hybrid power system cost breakdown. (WHK)

  8. Solar central receiver hybrid power system. Monthly technical progress report, February 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-03-01

    The three best regions for marketing a solar hybrid plant were studied. These are: East South Central, Rocky Mountain, and Pacific regions. The base load and intermediate load markets appear to be approximately 90 giga watts. The economic analysis made by SRI shows that a coal fired hybrid plant is economically competitive with pure coal plants for fuel escalation rates above 9% per year. For example: at 10% per year escalation the hybrid plant BBEC is 67 mils/Kwh compared to 70.7 mils/Kwh for a typical coal plant. The optimization studies conducted by McDonnell Douglas on the field geometry, tower height, and receiver dimensions are converging on an optical tower height of 120 m, 7332 heliostats and a receiver which is 10 m in diameter and 12 m high. One more iteration should fix the optical geometry for the 100 MWe plant with a solar multiple (S.M.) of 0.8. The preliminary values of the performance and design data sheets for the 100 MWe 0.9 S.M. hybrid base line plant have been prepared.

  9. Solar central receiver hybrid power system, Phase I. Volume 2. Conceptual design. Final technical report, October 1978-August 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-09-01

    The objectives of this study were to develop a hybrid power system design that (1) produces minimum cost electric power, (2) minimizes the capital investment and operating cost, (3) permits capacity displacement, (4) and achieves utility acceptance for market penetration. We have met the first three of these objectives and therefore believe that the fourth, utility acceptance, will become a reality. These objectives have been met by utilizing the Martin Marietta concept that combines the alternate central receiver power system design and a high-temperature salt primary heat transfer fluid and thermal storage media system with a fossil-fired nonsolar energy source. Task 1 reviewed the requirements definition document and comments and recommendations were provided to DOE/San Francisco. Task 2 consisted of a market analysis to evaluate the potential market of solar hybrid power plants. Twenty-two utilities were selected within nine regions of the country. Both written and verbal correspondence was used to assess solar hybrid power plants with respect to the utilities' future requirements and plans. The parametric analysis of Task 3 evaluated a wide range of subsystem configurations and sizes. These analyses included subsystems from the solar standalone alternate central receiver power system using high-temperature molten salt and from fossil fuel nonsolar subsystems. Task 4, selection of the preferred commerical system configuration, utilized the parametric analyses developed in Task 3 to select system and subsystem configurations for the commercial plant design. Task 5 developed a conceptual design of the selected commercial plant configuration and assessed the related cost and performance. Task 6 assessed the economics and performance of the selected configuration as well as future potential improvements or limitations of the hybrid power plants.

  10. Central receiver solar thermal power system, Phase 1. Quarterly progress report (final) for period ending March 31, 1976

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-10-01

    During this period (January 1976 through March 1976), the primary program effort was expended toward the completion of the detail design of the three major research experiments. Also, the Preliminary Pilot Plant Economic Cost Study was completed. In the Collector Subsystem, the designs for both the twenty-five mirror and the nine-mirror heliostats were completed and released. In the Receiver Subsystem, Foster Wheeler continued with the detail design of the 5 MW research experiment receiver. A preliminary draft of the detailed test plan for the receiver subsystem research experiment was prepared and is now undergoing a final review. The detailed design of the Thermal Storage Subsystem continued at Georgia Institute of Technology. Several incremental detail design reviews were held as the design progressed. During this period, Bechtel completed the preliminary environmental analysis for the Pilot Plant. The optimization studies of the electrical power generation subsystem were initiated. A major effort was the preparation of the preliminary cost analysis for the 10 MWe Central Receiver Solar Thermal Pilot Plant. This task required the development of a cost accounting structure and a definition of all of the costs associated with the design, construction, checkout, and two-year test of the Pilot Plant. (WDM)

  11. Solar Central Receiver Hybrid Power Systems sodium-cooled receiver concept. Final report. Volume II, Book 1. Conceptual design, Sections 1 through 4

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    The overall, long-term objective of the Solar Central Receiver Hybrid Power System program is to identify, characterize, and ultimately demonstrate the viability and cost effectiveness of solar/fossil, steam Rankine cycle, hybrid power systems that: (1) consist of a combined solar central receiver energy source and a nonsolar energy source at a single, common site, (2) may operate in the base, intermediate, and peaking capacity modes, (3) produce the rated output independent of variations in solar insolation, (4) provide a significant savings (50% or more) in fuel consumption, and (5) produce power at the minimum possible cost in mills/kWh. It is essential that these hybrid concepts be technically feasible and economically competitive with other systems in the near to mid-term time period (1985-1990) on a commercial scale. The program objective for Phase I is to identify and conceptually characterize solar/fossil steam Rankine cycle, commercial-scale, power plant systems that are economically viable and technically feasible. This volume presents in detail the market analysis, parametric analysis, and the selection process for the preferred system. (WHK)

  12. Conceptual design of solar central-receiver hybrid power system: sodium-cooled-receiver concept. Volume I of II. Conceptual design

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    A market analysis is reported consisting of estimates of overall market size derived from projections of electric power growth, examination of utility plans, and projections of potential regulatory action. Market share is projected by comparisons of the levelized costs of busbar power produced by hybrid coal solar units with costs of other electric power producers such as coal only, nuclear and solar only units. Parametric analyses of the major subsystems, consisting of the collector, receiver, storage, non-solar, electric power generation, and master control subsystems were conducted over a wide range of independent parameters in order to define subsystem operation and interfaces for use in the preferred system selection studies. The selection of the system, subsystems, and components of the 0.8 and 1.4 solar multiple sodium-cooled hybrid central receiver configurations were done. Technically feasible alternatives were compared on an economic basis. Detailed conceptual designs of the selected system concepts for the 0.8 and 1.4 solar multiple plants are presented. Cost estimates are also presented for both plants based on the conceptual designs. (LEW)

  13. U. S. Central Station Nuclear Power Plants: operating history

    Energy Technology Data Exchange (ETDEWEB)

    1976-01-01

    The information assembled in this booklet highlights the operating history of U. S. Central Station nuclear power plants through December 31, 1976. The information presented is based on data furnished by the operating electric utilities. The information is presented in the form of statistical tables and computer printouts of major shutdown periods for each nuclear unit. The capacity factor data for each unit is presented both on the basis of its net design electrical rating and its net maximum dependable capacity, as reported by the operating utility to the Nuclear Regulatory Commission.

  14. U.S. Central Station Nuclear Power Plants: operating history

    International Nuclear Information System (INIS)

    The information assembled in this booklet highlights the operating history of U. S. Central Station nuclear power plants through December 31, 1976. The information presented is based on data furnished by the operating electric utilities. The information is presented in the form of statistical tables and computer printouts of major shutdown periods for each nuclear unit. The capacity factor data for each unit is presented both on the basis of its net design electrical rating and its net maximum dependable capacity, as reported by the operating utility to the Nuclear Regulatory Commission

  15. The solar power tower Jülich – a solar thermal power plant for test and demonstration of air receiver

    OpenAIRE

    Hennecke, Klaus; Schwarzbözl, Peter; Hoffschmidt, Bernhard; Göttsche, Joachim; Koll, Gerrit; Beuter, Matthias; Hartz, Thomas

    2007-01-01

    The paper explains the fundamentals of the open volumetric receiver technology and shows the history of its development. It gives technical information about the system definition and the engineering of the Solar Power Tower Jülich. The open volumetric receiver technology allows the use of air as heat transfer medium at high temperatures in solar thermal power tower plants. It combines porous ceramic or metallic absorber structures with a strictly modular receiver design. Highly concentrat...

  16. Improved high temperature solar absorbers for use in Concentrating Solar Power central receiver applications.

    Energy Technology Data Exchange (ETDEWEB)

    Stechel, Ellen Beth; Ambrosini, Andrea; Hall, Aaron Christopher; Lambert, Timothy L.; Staiger, Chad Lynn; Bencomo, Marlene

    2010-09-01

    Concentrating solar power (CSP) systems use solar absorbers to convert the heat from sunlight to electric power. Increased operating temperatures are necessary to lower the cost of solar-generated electricity by improving efficiencies and reducing thermal energy storage costs. Durable new materials are needed to cope with operating temperatures >600 C. The current coating technology (Pyromark High Temperature paint) has a solar absorptance in excess of 0.95 but a thermal emittance greater than 0.8, which results in large thermal losses at high temperatures. In addition, because solar receivers operate in air, these coatings have long term stability issues that add to the operating costs of CSP facilities. Ideal absorbers must have high solar absorptance (>0.95) and low thermal emittance (<0.05) in the IR region, be stable in air, and be low-cost and readily manufacturable. We propose to utilize solution-based synthesis techniques to prepare intrinsic absorbers for use in central receiver applications.

  17. Investigations of receivers of tower focus solar power plants; Untersuchungen zu Strahlungsempfaengern von Solarturm-Kraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Heller, P.

    2002-07-01

    Solar power plant technology is concentrating on integrating solar power in high-efficiency power plant concepts like the combined-cycle process. Receivers tend to be of the type of pressurized volumetric receivers for air and gas heating to about 1200 . A model was developed and verified for characterizing the radiation field inside this type of receiver in the form of a characteristic field. This way, the geometry of high-efficiency isoflux absorbers can be developed very quickly and easily, and their sensitivity to misallignment and concentrator quality can be investigated. Further, the model can optimise the reflection loss of the quartz glass cover so that receiver efficiencies ulp to 96% appear feasible. [German] Die solare Kraftwerkstechnologie konzentriert sich immer staerker auf die Einkopplung von Solarenergie in hocheffiziente Kraftwerkskonzepte wie den GUD-Prozess. Dazu bieten sich Strahlungsempfaenger vom Typ des druckbeaufschlagten volumetrischen Receivers zur Luft- bzw. Gaserhitzung an, da diese fuer den benoetigten hohen Temperaturbereich bis 1200 C geeignet erscheinen. In der vorliegenden Arbeit wurde ein Modell entwickelt und verifiziert, mit dessen Hilfe die Charakterisierung des Strahlungsfeldes im Inneren eines solchen Receivers in Form eines Kennfeldes ermoeglicht wird. Dadurch kann sehr schnell und einfach die Geometrie fuer hocheffiziente Isoflux-Absorber entwickelt werden, aber auch deren Sensibilitaet gegenueber Fehlpositionierungen und der Konzentratorguete untersucht werden. Weiterhin kann mit dem Modell die Quarzglasabdeckung bzgl. ihrer Reflexionsverluste optimiert werden, sodass Receiverwirkungsgrade von bis zu 96% erreichbar erscheinen. (orig.)

  18. Combined cycle solar central receiver hybrid power system study. Volume III. Appendices. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-11-01

    A design study for a 100 MW gas turbine/steam turbine combined cycle solar/fossil-fuel hybrid power plant is presented. This volume contains the appendices: (a) preconceptual design data; (b) market potential analysis methodology; (c) parametric analysis methodology; (d) EPGS systems description; (e) commercial-scale solar hybrid power system assessment; and (f) conceptual design data lists. (WHK)

  19. Thermal performance prediction and sensitivity analysis for future deployment of molten salt cavity receiver solar power plants in Algeria

    International Nuclear Information System (INIS)

    Highlights: • Performance of power plant with molten salt cavity receiver is assessed. • A method has been used to optimize the plant solar multiple, capacity factor and LEC. • Comparison of the simulated results to those of PS20 has shown good agreement. • Higher fossil fuel fraction reduces the LEC and increases the capacity factor. • Highland and Sahara regions are suitable for CRS plants deployment. - Abstract: Of all Concentrating Solar Power (CSP) technologies available today, the molten salt solar power plant appears to be the most important option for providing a major share of the clean and renewable electricity needed in the future. In the present paper, a technical and economic analysis for the implementation of a probable molten salt cavity receiver thermal power plant in Algeria has been carried out. In order to do so, we have investigated the effect of solar field size, storage capacity factor, solar radiation intensity, hybridization and power plant capacity on the thermal efficiency and electricity cost of the selected plant. The system advisor model has been used to perform the technical performance and the economic assessment for different locations (coastal, highland and Sahara regions) in Algeria. Taking into account various factors, a method has been applied to optimize the solar multiple and the capacity factor of the plant, to get a trade-off between the incremental investment costs of the heliostat field and the thermal energy storage. The analysis has shown that the use of higher fossil fuel fraction significantly reduces the levelized electricity cost (LEC) and sensibly increases the capacity factor (CF). The present study indicates that hybrid molten salt solar tower power technology is very promising. The CF and the LEC have been found to be respectively of the order of 71% and 0.35 $/kWe. For solar-only power plants, these parameters are respectively about 27% and 0.63 $/kWe. Therefore, hybrid central receiver systems are

  20. Layouts of trigeneration plants for centralized power supply

    Science.gov (United States)

    Klimenko, A. V.; Agababov, V. S.; Il'ina, I. P.; Rozhnatovskii, V. D.; Burmakina, A. V.

    2016-06-01

    One of the possible and, under certain conditions, sufficiently effective methods for reducing consumption of fuel and energy resources is the development of plants for combined generation of different kinds of energy. In the power industry of Russia, the facilities have become widespread in which the cogeneration technology, i.e., simultaneous generation of electric energy and heat, is implemented. Such facilities can use different plants, viz., gas- and steam-turbine plants and gas-reciprocating units. Cogeneration power supply can be further developed by simultaneously supplying the users not only with electricity and heat but also with cold. Such a technology is referred to as trigeneration. To produce electricity and heat, trigeneration plants can use the same facilities that are used in cogeneration, namely, gas-turbine plants, steam-turbine plants, and gas-reciprocating units. Cold can be produced in trigeneration plants using thermotransformers of various kinds, such as vaporcompression thermotransformers, air thermotransformers, and absorption thermotransformers, that operate as chilling machines. The thermotransformers can also be used in the trigeneration plants to generate heat. The main advantage of trigeneration plants based on gas-turbine plants or gas-reciprocating units over cogeneration plants is the increased thermodynamic power supply efficiency owing to utilization of the waste-gas heat not only in winter but also in summer. In the steam-turbine-based trigeneration plants equipped with absorption thermotransformers, the enhancement of the thermodynamic power supply efficiency is determined by the increase in the heat extraction load during the nonheating season. The article presents calculated results that demonstrate higher thermodynamic efficiency of a gas-turbine-based plant with an absorption thermotransformer that operates in the trigeneration mode compared with a cogeneration gas-turbine plant. The structural arrangements of trigeneration

  1. Occurrence of pharmaceuticals in municipal wastewater treatment plants and receiving surface waters in Central and Southern Finland

    OpenAIRE

    Lindholm-Lehto, Petra

    2016-01-01

    The presence of five selected pharmaceuticals, four anti-inflammatory drugs, diclofenac, ibuprofen, ketoprofen, naproxen, and an antiepileptic drug carbamazepine, was determined at four municipal wastewater treatment plants (WWTPs) and in the receiving waterway near the city of Jyväskylä, in central Finland and also in the River Vantaa. First, an analytical method was developed including a pretreatment and purification followed by liquid chromatography coupled to tandem mass spectrometry (LC-...

  2. Central receiver solar thermal power system, Phase 1. CDRL Item 2. Pilot plant preliminary design report. Volume V. Thermal storage subsystem. [Sensible heat storage using Caloria HT43 and mixture of gravel and sand

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    The proposed 100-MWe Commercial Plant Thermal Storage System (TSS) employs sensible heat storage using dual liquid and solid media for the heat storage in each of four tanks, with the thermocline principle applied to provide high-temperature, extractable energy independent of the total energy stored. The 10-MW Pilot Plant employs a similar system except uses only a single tank. The high-temperature organic fluid Caloria HT43 and a rock mixture of river gravel and No. 6 silica sand were selected for heat storage in both systems. The system design, installation, performance testing, safety characteristics, and specifications are described in detail. (WHK)

  3. Nuclear power plant insurance in Central and Eastern Europe

    International Nuclear Information System (INIS)

    It was only after the decay of the Warsaw Pact, accompanied by emerging democratic structures and abolishment of the state monopolies, that an insurance market with private insurance companies had a chance to develop in these countries. West European insurance companies and their associations assisted and participated in this development by sending representatives and establishing branch offices. The paper reviews the current insurance regime for nuclear power plants of the Russian design types from the angle of international insurers as well as German insurance companies, referring to achievements so far and the foreseeable development. (orig./CB)

  4. Mathematical Modeling of a developed Central Receiver Based on Evacuated Solar Tubes

    OpenAIRE

    Ali Basil. H.; Gilani S. I.; Al-Kayiem Hussain H.

    2016-01-01

    Solar central receiver plays a considerable role in the plant output power; it is one of the most important synthesis in the solar power tower plants. Its performance directly affects the efficiency of the entire solar power generation system. In this study, a new designed receiver model based on evacuated solar tube was proposed, and the dynamic characteristics of the developed receiver were investigated. In order to optimise and evaluate the dynamic characteristics of solar power plant comp...

  5. Transient simulation of molten salt central receiver

    Science.gov (United States)

    Doupis, Dimitri; Wang, Chuan; Carcorze-Soto, Jorge; Chen, Yen-Ming; Maggi, Andrea; Losito, Matteo; Clark, Michael

    2016-05-01

    Alstom is developing concentrated solar power (CSP) utilizing 60/40wt% NaNO3-KNO3 molten salt as the working fluid in a tower receiver for the global renewable energy market. In the CSP power generation cycle, receivers undergo a daily cyclic operation due to the transient nature of solar energy. Development of robust and efficient start-up and shut-down procedures is critical to avoiding component failures due to mechanical fatigue resulting from thermal transients, thus maintaining the performance and availability of the CSP plant. The Molten Salt Central Receiver (MSCR) is subject to thermal transients during normal daily operation, a cycle that includes warmup, filling, operation, draining, and shutdown. This paper describes a study to leverage dynamic simulation and finite element analysis (FEA) in development of start-up, shutdown, and transient operation concepts for the MSCR. The results of the FEA also verify the robustness of the MSCR design to the thermal transients anticipated during the operation of the plant.

  6. Central-receiver solar-thermal power system. Collector subsystem research experiments detail design report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-02-24

    The detail design (DD) of research experiment hardware for the collector subsystem (heliostats) to support the 10 MW/sub e/ Pilot Plant preliminary design (PD) is presented. Additionally, test plans for assembly, integration, and array tests are presented, along with results of completed component/material tests. Research experiment DD and tests described were planned to provide design verification and supporting data, with hardware which either duplicates, or closely simulates the Pilot Plant PD baseline. (WHK)

  7. Receiver subsystem analysis report (RADL Item 4-1). 10-MWe Solar Thermal Central-Receiver Pilot Plant: solar-facilities design integration

    Energy Technology Data Exchange (ETDEWEB)

    1982-04-01

    The results are presented of those thermal hydraulic, structural, and stress analyses required to demonstrate that the Receiver design for the Barstow Solar Pilot Plant will satisfy the general design and performance requirements during the plant's design life. Recommendations resulting from those analyses and supporting test programs are presented regarding operation of the receiver. The analyses are limited to receiver subsystem major structural parts (primary tower, receiver unit core support structure), pressure parts (absorber panels, feedwater, condensate and steam piping/components, flash tank, and steam mainfold) and shielding. (LEW)

  8. Software/firmware design specification for 10-MWe solar-thermal central-receiver pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    Ladewig, T.D.

    1981-03-01

    The software and firmware employed for the operation of the Barstow Solar Pilot Plant are completely described. The systems allow operator control of up to 2048 heliostats, and include the capability of operator-commanded control, graphic displays, status displays, alarm generation, system redundancy, and interfaces to the Operational Control System, the Data Acquisition System, and the Beam Characterization System. The requirements are decomposed into eleven software modules for execution in the Heliostat Array Controller computer, one firmware module for execution in the Heliostat Field Controller microprocessor, and one firmware module for execution in the Heliostat Controller microprocessor. The design of the modules to satisfy requirements, the interfaces between the computers, the software system structure, and the computers in which the software and firmware will execute are detailed. The testing sequence for validation of the software/firmware is described. (LEW)

  9. Remote and Centralized Monitoring of PV Power Plants

    DEFF Research Database (Denmark)

    Kopacz, Csaba; Spataru, Sergiu; Sera, Dezso;

    2014-01-01

    measurements from the inverters within each PV plant. The monitoring software stores the PV measurements in a data warehouse optimized for managing and data mining large amounts of data, from where it can be later visualized, analyzed and exported. By combining PV production measurements data with I-V curve...

  10. Central Receiver Solar Thermal Power System, Phase 1. CDRL Item 10. Third quarterly technical progress report, 1 April 1976--30 June 1976. [10 MW

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1976-07-01

    Results of analysis and design efforts by McDonnell Douglas Astronautics Company (MDAC), Rocketdyne, Stearns-Roger, Inc., Sheldahl, Inc., and the University of Houston between 1 April 1976 and 30 June 1976 on ERDA Contract No. EY-76-C-03-1108 are summarized. This is the third quarterly technical progress report published on the Phase 1 Central Receiver Solar Thermal Power System contract. The dominant activities during the reporting period have involved the preparation of test facilities for the subsystem research experiments and the fabrication of the test hardware. Summaries of these activities are presented. Alternative design approaches for the 10-MWe pilot plant system and the current pilot plant project schedule are also presented and described.

  11. Solar central receiver prototype heliostat. Interim technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-04-05

    The objective of Phase I of this project is to support the Solar Central Receiver Power Plant research, development and demonstration effort by: (1) Establishment of a heliostat design, with associated manufacturing, assembly, installation and maintenance approaches, that, in quantity production will yield significant reductions in capital and operating costs over an assumed 30 year plant lifetime as compared with existing designs. (2) Identification of needs for near term and further research and development in heliostat concept, materials, manufacture, installation, maintenance, and other areas, where successful accomplishment and application would offer significant payoffs in the further reduction of the cost of electrical energy from Solar Central Receiver Power Plants. The Phase I study will define a low-cost heliostat preliminary design and the conceptual design of a heliostat manufacturing/installation plan which will result in low life cycle cost when produced and installed at high rate and large quantities for commercial Solar Central Receiver Power Plants. The study will develop the annualized life cycle cost and the performance of heliostats for a 30 year plant life, for each of three rates of continuous production and installation. The three specified rates are 25,000, 250,000, and 1,000,000 heliostats per year. The analysis of these varying production rates, requiring highly automated tooling and installation equipment concepts, will define the economies of large scale not realizable on Pilot Plant or Demonstration Plant installations. Project status is described in detail. (WHK)

  12. Integral power evaluation in fossil fuel power plants; Evaluacion energetica integral en unidades de centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa I, Luis R; Sanchez H, Laura E; Rodriguez M, Jose H [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Nebradt G, Jesus [Unidad de Investigacion y Desarrollo de la Subdireccion de Generacion de la Comision Federal de Electricidad, (Mexico)

    2006-07-01

    In this occasion, a methodology is presented that carries out an integral energy evaluation of fossil fuel power plants units (FFPPU) with the purpose of determining the root of the significant decrements of power produced soon after the annual maintenance service. This proposal, besides identifying the origin of the energy efficiency problems, offers information about the contributions of each one of the involved equipment in the total decrement of the unit. With this methodology, the maintenance focuses in the equipment that contributes to the greater energy loss. This document presents such methodology along with its application in a real case, results and necessary remedial actions, demonstrating that its application offers bases for the investment in corrective measures. [Spanish] En esta ocasion se presenta una metodologia que efectua una evaluacion energetica integral de las unidades de centrales termoelectricas (UCT) con el fin de determinar la raiz de los decrementos de potencia significativos producidos luego del servicio anual de mantenimiento. Dicha propuesta, ademas de identificar el origen de los problemas de eficiencia energetica, brinda informacion acerca de las aportaciones de cada uno de los equipos involucrados al decremento total de la unidad. Con esta metodologia, el mantenimiento se enfoca a los equipos que contribuyen a la mayor perdida de potencia. Este documento exhibe tal metodologia junto con su aplicacion en un caso real, resultados y las acciones correctivas necesarias, demostrando que su aplicacion ofrece bases para una inversion futura en medidas correctivas.

  13. A partitioned central solar receiver

    International Nuclear Information System (INIS)

    Else of solar energy as substitute for conventional fuels at a competitive cost requires efficient conversion from solar radiation to usable forms of energy. In solar thermal or thermochemical applications, high efficiency usually re- quires high temperature and high concentration of incoming radiation. The main form of energy loss from high temperature solar central receivers is thermal emission ('re radiation'), at an effective temperature close to the maximum receiver temperature. This loss is reduced if the aperture is divided into segments, most of which are maintained at lower temperatures. A two-stage partitioned receiver demonstrating this concept is under construction at the Weizman Solar Tower. The high-temperature stage is the DIAPR (Directly Irradiated Annular Pressurized Receiver). The low-temperature stage is made of tubular cavity receivers of simpler design. Preliminary optical and thermal design of the partitioned receiver is presented. For the design exit temperature of 1500 K, the aperture size of the partitioned receiver is about 60% of the equivalent single-stage receiver, indicating a significant increase of conversion efficiency. The exit temperature of the low-temperature stage is around 1100 K, allowing simpler design and inexpensive construction. (authors)

  14. A study of a solar central power plant with a gas turbine - Project Sirocco modelling and control

    Science.gov (United States)

    Kacim, M.

    A thermodynamics and receiver design analysis is presented for a solar tower power plant, together with a control model for operations in varying working conditions. The analysis covers the central receiver and the gas-air turbine, adapted for functioning at 820 C, such as was experienced with the 100 kW Project Sirocco test station. A heliostat field concentrates solar energy onto a central receiver traversed by compressed air, which is allowed to expand while driving a turbine generator. A combustion chamber is included in the loop to augment the thermal performance when insufficient solar energy is available. The plant can be either grid-connected or stand alone. Static and dynamic characteristics of the thermal loop are modelled, and are included in the development of control laws based on quadratic criteria. An optimized control scheme is devised which features weighting criteria matrices, and the results of simulations covering different insolation levels are reported. Finally, an adjoint state control system is produced to account for peculiarities of the power plant.

  15. Solar Central Receiver Prototype Heliostat. Volume I. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-06-01

    The objective of this project was to support the Solar Central Receiver Power Plant research, development and demonstration effort by: (1) Establishment of a heliostat design, with associated manufacturing, assembly, installation and maintenance approaches, that, in quantity production will yield significant reductions in capital and operating costs over an assumed 30 year plant lifetime as compared with existing designs; and (2) Identification of needs for near term and future research and development in heliostat concept, materials, manufacture, installation, maintenance, and other areas, where successful accomplishment and application would offer significant payoffs in the further reduction of the cost of electrical energy from solar central receiver power plants. The prototype heliostat design is presented in detail; and manufacturing, installation, and maintenance procedures described. (WHK)

  16. Modelling, Simulation and Identification of Heat Loss Mechanisms for Parabolic Trough Receivers Installed in Concentrated Solar Power Plants

    OpenAIRE

    Caron, Simon; Röger, Marc

    2015-01-01

    This paper describes a thermodynamic model library developed with the object-oriented language Modelica, which is both implemented for steady-state and transient heat transfer analyses of Parabolic Trough Receivers (PTRs) installed in Concentrated Solar Power (CSP) plants. For the identification of PTR heat loss mechanisms, this heat transfer model is coupled to a derivative-free hybrid optimization routine developed in Matlab, combining a Particle Swarm Optimization (PSO) algorithm with a...

  17. IAEA activities to improve occupational radiation protection in nuclear power plants in Central and Eastern Europe

    International Nuclear Information System (INIS)

    The following aspects are highlighted: developing standards, ISOE (Information System on Occupational Exposure), providing assistance, and intercomparisons. By means of these coordinated efforts, the IAEA aims at improving occupational radiation protection in nuclear power plants in Central and Eastern Europe. The objective is not only transfer of knowledge and technology but also encouraging cooperation between health physicists in those countries as well as with health physicists in Western countries. (P.A.)

  18. Electric protections based in microprocessors in power plants; Protecciones electricas basadas en microprocesadores en centrales generadoras

    Energy Technology Data Exchange (ETDEWEB)

    Libreros, Domitilo; Castanon Jimenez, Jose Ismael [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1987-12-31

    This article is centered around the substitution of the conventional electric protections of a power plant in connection type unit for protections based in microprocessors. A general model of conventional protection of a power plant is described and the number of analogic and digital signals that intervene in that model are quantified. A model is setup for power plant protection with microprocessors, analyzing each one of the modules that would form it. Finally, the algorithms to carry on such protection are presented. [Espanol] Este articulo se centra en torno a la sustitucion de las protecciones electricas convencionales de una central generadora en conexion tipo unidad por protecciones basadas en microprocesadores. Se describe el modelo general de proteccion convencional de una central generadora y se cuantifica el numero de senales analogicas y digitales que interviene en dicho modelo. Se propone un modelo para proteccion de centrales generadoras mediante microprocesadores, analizandose cada uno de los modulos que lo conformarian. Finalmente, se presentan los algoritmos para realizar dicha proteccion.

  19. Floating atomic central heating-and-power plant converted from a strategic submarine

    International Nuclear Information System (INIS)

    In accordance with open-quotes The Treaty on the Reduction of Strategic Offensive Armsclose quotes signed in July 1991, the operations envisages by open-quotes The Procedures for elimination of SSBN's Launchersclose quotes should be accomplished at submarines of the second generation both by eliminating missile compartments together with launchers and by removal of launchers only from missile compartments. THe number of such ships could reach 30 units as has been forecasted for the year of 1998 inclusive. With regard to the fact that the remaining operation life of the main power plant equipment of a nuclear submarine decommissioned in accordance with the Treaty is about 50 per cent, potentially there is a possibility to convert them into floating atomic central heating-and-power plants. The latter variant envisaged in the open-quotes Procedures...close quotes is preferable for developing a floating plant based on ships decommissioned from the Navy, since it permits to remove launchers without cutting and subsequent connection of main cables, pipelines and systems which provide the control of the main power plant, nuclear safety, radiological safety, damage control and fire safety of the floating plant. A submarine could be delivered for refitting into a floating plant only after accomplishing the works envisaged by the open-quotes Procedures...close quotes

  20. Geothermal power plants of Mexico and Central America: a technical survey of existing and planned installations

    Energy Technology Data Exchange (ETDEWEB)

    DiPippo. R.

    1978-07-01

    In this report, the fifth in a series describing the geothermal power plants of the world, the countries of Mexico and of Central America are studied. The geothermal plants are located in areas of recent and active volcanism; the resources are of the liquid-dominated type. Details are given about the plants located at Cerro Prieto in Mexico and at Ahuachapan in El Salvador. In both cases, attention is paid to the geologic nature of the fields, the well programs, geofluid characteristics, energy conversion systems, materials of construction, effluent handling systems, economic factors and plant operating experience. Exploration and development activities are described for other promising geothermal areas in Mexico and El Salvador, along with those in the countries of Costa Rica, Nicaragua, Guatemala, Honduras, and Panama.

  1. External and internal radiation doses from the Fukushima Daiichi Nuclear Power Plant accident received by residents of Chiba, Japan

    International Nuclear Information System (INIS)

    Radioactive substances discharged into the atmosphere from the damaged Fukushima Daiichi Nuclear Power Plant (NPP) first reached the Chiba-City on March 15, 2011. Atmospheric and tap water samples were collected from March 2011 to August 2012 to measure of radioactivity in the Chiba-City, about 220 km SSE of the Fukushima NPP. We then used the data to analyze the external and internal (from inhalation of contaminated air or ingestion of contaminated drinking water) radiation doses received by the residents of the Chiba-City after the accident. (author)

  2. A 200kW central receiver CPV system

    International Nuclear Information System (INIS)

    Raygen Resources has recently completed a Central Receiver CPV (CSPV) pilot plant in Central Victoria, Australia. The system is under final commissioning and initial operation is expected in late April 2015. The pilot demonstrates a full scale CSPV repeatable unit in a form that is representative of a commercial product and provides a test bed to prove out performance and reliability of the CSPV technology. Extensive testing of the system key components: dense array module, wireless solar powered heliostat and control system has been performed in the laboratory and on sun. Results from this key component testing are presented herein

  3. Effectiveness of a large mimic panel in an existing nuclear power plant central control board

    International Nuclear Information System (INIS)

    We conducted the analysis of the nuclear power plant (NPP) operators' behaviors under emergency conditions by using training simulators as a joint research project by Japanese BWR groups for twelve years. In the phase-IV of this project we executed two kinds of experiments to evaluate the effectiveness of the interfaces. One was for evaluations of the interfaces such as CRTs with touch screen, a large mimic panel, and a hierarchical annunciator system introduced in the newly developed ABWR type central control board. The other was that we analyzed the operators' behaviors in emergency conditions by using the first generation BWR type central control board which was added new interfaces such as a large display screen and demarcation on the board to help operators to understand the plant. The demarcation is one of the visual interface improvements and its technique is that a line enclosing several components causes them to be perceived as a group.The result showed that both the large display panel Introduced in ABWR central control board and the large display screen in the existing BWR type central control board improved the performance of the NPP operators in the experiments. It was expected that introduction of the large mimic panel into the existing BWR type central control boards would improve operators' performance. However, in the case of actual installation of the large display board into the existing central control boards, there are spatial and hardware constraints. Therefore the size of lamps, lines connecting from symbols of the pumps or valves to the others' will have to be modified under these constraints. It is important to evaluate the displayed information on the large display board before actual installation. We made experiments to solve these problems by using TEPCO's research simulator which is added a large mimic panel. (author)

  4. Elecnuc. Nuclear power plants in the world; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    This 2003 version of Elecnuc contents information, data and charts on the nuclear power plants in the world and general information on the national perspectives concerning the electric power industry. The following topics are presented: 2002 highlights; characteristics of main reactor types and on order; map of the French nuclear power plants; the worldwide status of nuclear power plants on 2002/12/3; units distributed by countries; nuclear power plants connected to the Grid by reactor type groups; nuclear power plants under construction; capacity of the nuclear power plants on the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear plants by country at the end 2002; performance indicator of french PWR units; trends of the generation indicator worldwide from 1960 to 2002; 2002 cumulative Load Factor by owners; nuclear power plants connected to the grid by countries; status of license renewal applications in Usa; nuclear power plants under construction; Shutdown nuclear power plants; exported nuclear power plants by type; exported nuclear power plants by countries; nuclear power plants under construction or order; steam generator replacements; recycling of Plutonium in LWR; projects of MOX fuel use in reactors; electricity needs of Germany, Belgium, Spain, Finland, United Kingdom; electricity indicators of the five countries. (A.L.B.)

  5. Elecnuc. Nuclear power plants in the world; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1997 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1997; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; forecasts; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  6. Evaluation of second-generation central receiver technologies

    International Nuclear Information System (INIS)

    This paper summarizes the results of a study performed by the US and Germany to assess the technical and economic potential of central receiver power plants and to identify the necessary research and development (R ampersand D) activities required to reach demonstration and commercialization. Second generation power plant designs, employing molten-salt and volumetric-air receivers, were assessed at the size of 30 and 100 MWe. The study developed a common guideline and used data from previous system tests and studies. The levelized-energy costs for the second generation plants were estimated and found to be competitive with costs from fossil-fueled power plants. Potential for further cost reductions exists if technical improvements can be introduced successfully in the long term. Additionally, the study presents results of plant reliability and uncertainty analyses. Mid- and long-term technical potentials are described, as well as recommendations for the R ampersand D activities needed to reach the goal of large-scale commercialization. The results of this study have already helped direct research in the US and Europe. For example, the favorable potential for these technologies has led to the Solar Two molten-salt project in the US and the TSA volumetric receiver test in Spain. In addition, early analysis conducted within this study indicated that an advanced thermal storage medium was necessary to achieve favorable economics for the air plant. This led to the design of the thermal storage system currently being tested in Spain. In summary, each of the investigated receiver technologies has mid- and long-term potential for improving plant performance and reducing capital and energy costs (resulting in less than 10 cts/kWh given excellent insolation conditions) in an environmentally safe way and largely independent of fossil-fuel prices

  7. Elecnuc. Nuclear power plants in the world; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. These data come from the IAEA's PRIS and AREVA-CEA's GAIA databases. The following aspects are reviewed: 2007 highlights; Main characteristics of reactor types; Map of the French nuclear power plants on 2007/01/01; Worldwide status of nuclear power plants (12/31/2007); Units distributed by countries; Nuclear power plants connected to the Grid- by reactor type groups; Nuclear power plants under construction on 2007; Evolution of nuclear power plants capacities connected to the grid; First electric generations supplied by a nuclear unit in each country; Electrical generation from nuclear power plants by country at the end 2007; Performance indicator of French PWR units; Evolution of the generation indicators worldwide by type; Nuclear operator ranking according to their installed capacity; Units connected to the grid by countries at 12/31/2007; Status of licence renewal applications in USA; Nuclear power plants under construction at 12/31/2007; Shutdown reactors; Exported nuclear capacity in net MWe; Exported and national nuclear capacity connected to the grid; Exported nuclear power plants under construction; Exported and national nuclear capacity under construction; Nuclear power plants ordered at 12/31/2007; Long term shutdown units at 12/31/2007; COL (combined licences) applications in the USA; Recycling of Plutonium in reactors and experiences; Mox licence plants projects; Appendix - historical development; Meaning of the used acronyms; Glossary.

  8. Large-scale use of solar energy with central receivers

    Science.gov (United States)

    Kreith, F.; Meyer, R. T.

    1983-12-01

    The working principles of solar central receiver power plants are outlined and applications are discussed. Heliostat arrays direct sunlight into a receiver cavity mounted on a tower, heating the working fluid in the tower to temperatures exceeding 500 C. The formulation for the image plane and the geometric concentration ratio for a heliostat field are provided, noting that commercial electric power plants will require concentration ratios of 200-1000. Automated controls consider imperfections in the mirrors, tracking errors, and seasonal insolation intensity and angular variations. Membranes may be used instead of rigid heliostat mirrors to reduce costs, while trade-offs exist between the efficiencies of cavity and exterior receivers on the tower. Sensible heat storage has proved most effective for cloudy or nighttime operations. Details of the DOE Solar One 10 MW plant, which began operation in 1982, are provided, with mention given to the 33.6 continuous hours of power generation that have been achieved. Projected costs of commercial installations are $700/kWt, and possible applications include recovering and refining oil, processing natural gas, uranium ore, and sugar cane, drying gypsum board, and manufacturing ammonia.

  9. Puertollano IGCC Power Plant; Central de Gasificacion Integrada en Ciclo Combinado de Puertollano

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    The Puertollano IGCC Power Plant, rated 335 MW and located in Puertollano, Ciudad Real, in the central area of Spain, is a project led by ELCOGAS, a company incorporated by the European utilities ENDESA, ELECTRICITE DE FRANCE, IBERDROLA HIDROCANTABRICO ELECTRICIDADE DE PURTUGAL, ENEL and NATIONAL POWER and the technology and equipment suppliers SIEMENS, KRUPP UHDE and BABCOCK WILCOX ESPANOLA. IGCC technology is based in a process of coal gasification to obtain a clean combustion synthetic gas, integrated with a combined cycle, agas and steam, electricity-generating unit. The energy efficiency which is aimed to achieve at the Plant is 46% in ISO conditions. The Gasification unit uses the process of pressurised entrained flow for coal gasification. The gas is produced by the reaction of coal with oxygen at high temperatures, of up to 1600 degree centigree. This process is capable of gasifying a wide variety of types and qualities of coal for the production of a synthetic fuel gas. In the case of Puertollano, the raw fuel is a 50% mixture by weight of local coal and petroleum coke. The oxygen needed in the process and the nitrogen used for covering the fuel is generated in the Air Separation. The Gas Cleaning and Sulphur Recovery Unit clean the gases from contaminants and solid particles before to send them to the Gas Turbine. The clean gas is burnt in gas turbine of the Combined Cycle Plant, producing electricity. The exhaust gases feed a heat recovery steam generator, which produces steam used to generate additional electricity in a conventional steam turbine. The gas turbine is capable of operating both with synthetic gas and with natural gas, allowing operation flexibility. The net output of the plant up to December 1999 was 3.061 GWh, from them 344 GWh were produced with synthetic gas. This project has an important technological value, being the first power plant which uses coal gasification to feed a combined cycle in Spain and being also the biggest power plant

  10. Mathematical Modeling of a developed Central Receiver Based on Evacuated Solar Tubes

    Directory of Open Access Journals (Sweden)

    Ali Basil. H.

    2016-01-01

    Full Text Available Solar central receiver plays a considerable role in the plant output power; it is one of the most important synthesis in the solar power tower plants. Its performance directly affects the efficiency of the entire solar power generation system. In this study, a new designed receiver model based on evacuated solar tube was proposed, and the dynamic characteristics of the developed receiver were investigated. In order to optimise and evaluate the dynamic characteristics of solar power plant components, the model investigates the solar radiation heat conversion process through the developed receiver, where the energy and mass conservation equations are used to determine the working fluid temperature and state through the receiver parts, beside the calculation and analysis of the thermal losses.

  11. System studies of coal fired-closed cycle MHD for central station power plants

    Science.gov (United States)

    Zauderer, B.

    1976-01-01

    This paper presents a discussion of the closed cycle MHD results obtained in a recent study of various advanced energy conversion (ECAS) power systems. The study was part of the first phase of this ECAS study. Since this was the first opportunity to evaluate the coal fired closed cycle MHD system, a number of iterations were required to partially optimize the system. The present paper deals with the latter part of the study in which the direct coal fired, MHD topping-steam bottoming cycle was established as the current choice for central station power generation. The emphasis of the paper is on the background assumptions and the conclusions that can be drawn from the closed cycle MHD analysis. The author concludes that closed cycle MHD has efficiencies comparable to that of open cycle MHD and that both systems are considerably more efficient than the other system studies in Phase 1 of the GE ECAS. Its cost will possibly be slightly higher than that of the open cycle MHD system. Also, with reasonable fuel escalation assumptions, both systems can produce lower cost electricity than conventional steam power plants. Suggestions for further work in closed cycle MHD components and systems is made.

  12. Elecnuc. Nuclear power plants in the world; Elecnuc. Les centrales nucleaires dans le monde

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1999 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1999; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; grid connection forecasts; world electric power market; electronuclear owners and share holders in EU, capacity and load factor; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; 1999 gross load factor by operator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  13. 10-MWe solar-thermal central-receiver pilot plant: collector subsystem foundation construction. Revision No. 1

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-18

    Bid documents are provided for the construction of the collector subsystem foundation of the Barstow Solar Pilot Plant, including invitation to bid, bid form, representations and certifications, construction contract, and labor standards provisions of the Davis-Bacon Act. Instructions to bidders, general provisions and general conditions are included. Technical specifications are provided for the construction. (LEW)

  14. End of investments within central funds called ''Construction of the 12 x 360 MW Belchatow Power Plants''

    International Nuclear Information System (INIS)

    In 1979-1982 58 seismic events of magnitude 0.6-4.6 degrees in Richter scale were recorded in Central Poland being the consequence of surface mining in Belchatow region where brown power is extracted for the needs of Belchatow power plant (12 x 360 MW). The seismic events did not damage the main building of the power plant despite the fact that they had not be taken into account by designers (such case had not be described in the surface mining literature). 2 tabs

  15. 2013 Pacific Gas and Electric Diablo Canyon Power Plant (DCPP): San Simeon, CA Central Coast

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Diablo Canyon Power Plant (DCPP) LiDAR and Imagery datasets are comprised of three separate LiDAR surveys: Diablo Canyon (2010), Los Osos (2011), and San Simeon...

  16. CO2 capture processes in power plants - Le captage du CO2 dans les centrales thermiques

    CERN Document Server

    Bouallou, Chakib

    2010-01-01

    This review is devoted to assess and compare various processes aiming at recover CO2 from power plants fed with natural gas (NGCC) and pulverized coal (PC). These processes are post combustion CO2 capture using chemical solvents, natural gas reforming for pre-combustion capture and oxy-fuel combustion with cryogenic recovery of CO2. These processes were evaluated to give some clues for choosing the best option for each type of power plant. The comparison of these various concepts suggests that, in the short and medium term, chemical absorption is the most interesting process for NGCC power plants. For CP power plants, oxy-combustion can be a very interesting option, as well as post-combustion capture by chemical solvents.

  17. 2010 Pacific Gas and Electric Diablo Canyon Power Plant (DCPP): Diablo Canyon, CA Central Coast

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Diablo Canyon Power Plant (DCPP) LiDAR and Imagery datasets are comprised of three separate LiDAR surveys: Diablo Canyon (2010), Diablo Canyon (2010), and San...

  18. 2011 Pacific Gas and Electric Diablo Canyon Power Plant (DCPP): Los Osos, CA Central Coast

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Diablo Canyon Power Plant (DCPP) LiDAR and Imagery datasets are comprised of three separate LiDAR surveys: Diablo Canyon (2010), Los Osos (2011), and San Simeon...

  19. Allocation of responsibilities between central and local authorities concerning nuclear power plant licensing

    International Nuclear Information System (INIS)

    This paper examines Belgian regulations on licences to construct and operate nuclear power plants in the context of implementation of the 1980 Act concerning regionalisation. It also reviews the relevant nuclear legislation in certain other countries. (NEA)

  20. Nuclear power plants making a comeback in Japan; El retorno de la centrales nucleares en Japon

    Energy Technology Data Exchange (ETDEWEB)

    Torralbo, J. R.

    2016-08-01

    We reproduce in this magazine the interesting article published by the president of the SNE in issue 46 of Cuadernos de Energia in October 2015, which describes the events that have taken place since the March 11, 2011 earthquake in Japan, the largest in its history, and the subsequent tsunami, which affected the Fukushima power plant, as well as the measures implemented since then and how some of this country nuclear power plants are being started up again. (Author)

  1. New steels for fossil-fired power plants; De nouveaux aciers pour les centrales thermiques classiques

    Energy Technology Data Exchange (ETDEWEB)

    Prunier, V.

    1996-10-01

    Most utilities are determined to enhance the efficiency of their fossil-fired power plants. Related industrial firms are showing an increasing interest in what are known as `supercritical` or `ultra-supercritical` power plants. In these new plants, efficiency is enhanced by increasing the steam temperature and pressure. Conditions aimed at are as follows: T {approx} 580-600 deg and P {approx} 250 bar for supercritical and T {approx} 650 deg C and P {approx} 300-350 bar for ultra-supercritical. Main limiting factors for increasing efficiency are unquestionably related to materials. The new creep, fatigue and corrosion requirements call for substantial research, ensuring that new grades of alloys are regularly propose. The relevance for EDF of higher efficiency plants has led us to define a work program aimed at better acquaintance with materials which could be used in such installations. These materials are also interesting in older plants, where they would enable the thickness of major components to be considerably reduced. The present document is a bibliographical study in two parts. We first present the main alloys suitable for the manufacture of components subjected to creep, thermal fatigue or corrosion in fossil-fired power plants. We identify in particular the first steel grades used in former plants and those recently developed for improved efficiency supercritical or ultra-supercritical plants. We then give details on the main mechanical and structural properties of the eight most interesting alloys: 2.25Cr-1Mo steel, most frequently encountered in operating plants; HCM2S steel, used for the manufacture of water panels tubes without post welding heat treatment; modified 9 Cr-1Mo steel, the international reference for thick components; NF616, HCM12A and NF12 steels for thick components in improved efficiency plants; TP347HFG and NF709 steels for tubes in improved efficiency plants. (author) 40 refs.

  2. Ground acceleration in a nuclear power plant; Aceleracion del suelo en una central nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Pena G, P.; Balcazar, M.; Vega R, E., E-mail: pablo.pena@inin.gob.mx [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2015-09-15

    A methodology that adopts the recommendations of international organizations for determining the ground acceleration at a nuclear power plant is outlined. Systematic presented here emphasizes the type of geological, geophysical and geotechnical studies in different areas of influence, culminating in assessments of Design Basis earthquake and the earthquake Operating Base. The methodology indicates that in regional areas where the site of the nuclear power plant is located, failures are identified in geological structures, and seismic histories of the region are documented. In the area of detail geophysical tools to generate effects to determine subsurface propagation velocities and spectra of the induced seismic waves are used. The mechanical analysis of drill cores allows estimating the efforts that generate and earthquake postulate. Studies show that the magnitude of the Fukushima earthquake, did not affect the integrity of nuclear power plants due to the rocky settlement found. (Author)

  3. Solar thermionic power plant. II

    Science.gov (United States)

    Abou-Elfotouh, F.; Almassary, M.; Fatmi, H.

    It has been shown that the geometric configuration of a central receiver solar electric power plant SEPP can be optimized for the high power density and concentration required for the operation of a thermionic converter. The working period of a TDC constructed on the top of a SEPP in Riyadh area is 5 to 6 hours per day in winter and 6 to 8 hours in summer. At the 25 percent conversion efficiency achieved by a laboratory test model, a reduction in the cost per unit power of 8-12 per cent is expected. The spectral behavior and work functions of the working surface of the thermionic electrodes were investigated

  4. Atmospheric pollution in thermal power plants; Contaminacion atmosferica en centrales termicas convencionales

    Energy Technology Data Exchange (ETDEWEB)

    Aguirre Diaz, A.

    1997-04-01

    The author presents the atmospheric pollution by fossil-fuel power plants. The state of the art is developed in 4 chapters: Legislation, Sulfur dioxide: reduction of SO{sub 2}, nitrogen oxides: reduction of emissions, particulates: reduction of particulates and new technologies. (Author)

  5. High-Temperature Thermal Storage System for Solar Tower Power Plants with Open-Volumetric Air Receiver Simulation and Energy Balancing of a Discretized Model

    OpenAIRE

    Kronhardt, Valentina; Alexopoulos, Spiros; Reißel, Martin; Sattler, Johannes; Hoffschmidt, Bernhard; Hänel, Matthias; Doerbeck, Till

    2013-01-01

    This paper describes the modeling of a high-temperature storage system for an existing solar tower power plant with open volumetric receiver technology, which uses air as heat transfer medium (HTF). The storage system model has been developed in the simulation environment Matlab/Simulink®. The storage type under investigation is a packed bed thermal energy storage system which has the characteristics of a regenerator. Thermal energy can be stored and discharged as required via the HTF air. ...

  6. Performance and costs of advanced sustainable central power plants with CCS and H2 co-production

    International Nuclear Information System (INIS)

    Highlights: ► Thermo-economic analyses of co-producing electricity and H2 with CO2 capture. ► Gasification plants with solid oxide fuel cells and combined cycles are compared. ► 66 wt.% Utah coal, 17 wt.% corn stover and 17 wt.% cereal straw are gasified. ► H2 production cost is lowered by >50% with fuel cell based gasification plant. ► 70% more net electricity due to synergy between hydrogasification and fuel cells. -- Abstract: With increasing concerns over global climate change caused by GHG emissions, carbon capture and storage (CCS) has become imperative for coal based power plants. Meanwhile, with the development and deployment of hybrid vehicles, electric vehicles, and alternative fuel vehicles, GHG reduction efforts in the power industry can also benefit the transportation sector. Power plants with H2 co-production capability can contribute significantly in such development trends because H2 powered fuel cell hybrid vehicles are very promising for future “zero emissions vehicles”. This work investigates the thermodynamic performance and cost advantage of employing advanced technologies currently under development for central power plants that (1) employ coal and biomass as feed stock; (2) co-produce power and high purity H2; (3) capture most of the CO2 evolved within the plants. Two system designs are developed: the first “base” case is an integrated gasification combined cycle (IGCC) system consisting of commercially ready technologies; the second “advanced” case is an integrated gasification fuel cell (IGFC) system. The feedstock employed consists of Utah bituminous coal along with two typical biomass resources, corn stover and cereal straw. The IGFC plant produces significantly higher amount of electricity for the same amounts of feedstock and H2 export while the cost of producing the H2 using a cost of electricity of $135/MW h is $1178/tonne for the IGFC case versus $2620/tonne for the IGCC case.

  7. Evaluation of cable ageing in Nuclear Power Plants; Evaluacion del envejecimiento de cables en centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Lopez Vergara, T. [Empresarios Agrupados, A. I. E. Madrid (Spain); Alonso Chicote, J. [TECNATOM, S. A. (Spain); Burnay, S. [AEA Technology (UK)

    2000-07-01

    The majority of power, control and instrumentation cables in nuclear power plants use polymers as their basic material for insulation and jacket. In many cases, these cables form part of safety-related circuits and should therefore be capable of operating correctly under both normal and accident conditions. Since polymeric materials are degraded by the long term action of the radiation and thermal environments found in the plant, it is important to be able to establish the cable condition during the plant lifetime. Nowadays there are a number of different methods to evaluate the remaining lifetime of cables. In the case of new plants, or new cables in old plants, accelerated ageing tests and predictive models can be used to establish the behaviour of the cable materials under operating conditions. There are verified techniques and considerable experience in the definition of predictive models. This type of approach is best carried out during the commissioning stage or in the early stages of operation. In older plants, particularly where there is a wide range of cable types in use, it is more appropriate to use condition monitoring methods to establish the state of degradation of cables in-plant. Over the last 10 years there have been considerable developments in methods for condition monitoring of cables and a tool-box of practical techniques are now available. There is no single technique which is suitable for all cable materials but the range of methods covers nearly all of the types currently in use, at present, the most established methods are the indented, thermal analysis (OIT, OITP and TGA) and dielectric loss measurements, All of these are either non-destructive methods or require only micro-samples of material. (Author) 15 refs.

  8. Hinkley point C: A new chance for nuclear power plant construction in central Europe?

    International Nuclear Information System (INIS)

    This text focuses on the decision of the European Commission on the admissibility of state support for the expansion of Hinkley Point C, a British nuclear power plant. The European Commission not only influenced the development of energy sector in the UK with its decision, but also sent a strong signal that it is possible to use state aid for new nuclear power plants in the EU. The example of the Czech Republic shows the way this signal may be perceived by governments and energy stakeholders and how it can influence the national debates about the construction of new nuclear power plants, even before the detailed information about the whole case of state aid for Hinkley Point C has been published. -- Highlights: •Text deals with the EU's decision on the state support for the NPP Hinkley Point C. •This decision sends a strong signal about possible state aid for new NPPs in the EU. •Other member states are possible to consider similar pattern of financing. •The case of the Czech Republic is used to demonstrate the situation

  9. Solar Central Receiver Prototype Heliostat. Volume II. Phase II planning (preliminary)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    A currently planned DOE program will develop and construct a 10 MW/sub e/ Pilot Plant to demonstrate the feasibility and operational characteristics of Solar Central Receiver Power Generation. The field of heliostats is a major element of the Solar Central Receiver Power Generation system. The primary objective of the program described is to establish and verify the manufacturability, performance, durability, and maintenance requirements of the commercial plant heliostat design. End products of the 16 month effort include: (1) design, fabrication, and test of heliostats; (2) preliminary designs of manufacturing, assembly, installation, and maintenance processes for quantity production; (3) detailed design of critical tooling or other special equipment for such processes; (4) refined cost estimates for heliostats and maintenance; and (5) an updated commercial plant heliostat preliminary design. The program management and control system is discussed. (WHK)

  10. DC wiring system grounding and ground fault protection issues for central station photovoltaic power plants

    Science.gov (United States)

    Simburger, E. J.

    1983-01-01

    The DC wiring system for a photovoltaic power plant presents a number of unique challenges to be overcome by the plant designers. There are a number of different configurations that the grounding of the DC wiring system can take, and the choice will affect the number and type of protective devices required to ensure safety of personnel and protection of equipment. The major grounding and fault protection considerations that must be taken into account when selecting the basic overall circuit configuration are summarized. The inherent advantages and disadvantages of each type of circuit grounding (resistance or solid) along with the personnel safety and equipment protection issues for each of these grounding methods are presented.

  11. CO2 capture processes in power plants - Le captage du CO2 dans les centrales thermiques

    OpenAIRE

    Bouallou, Chakib

    2010-01-01

    PDF file available for free at http://pubs.ub.ro/?pg=revues&rev=cscc6&num=201011&vol=1&aid=2975 International audience This review is devoted to assess and compare various processes aiming at recover CO2 from power plants fed with natural gas (NGCC) and pulverized coal (PC). These processes are post combustion CO2 capture using chemical solvents, natural gas reforming for pre-combustion capture and oxy-fuel combustion with cryogenic recovery of CO2. These processes were evaluated to giv...

  12. Knowledge management in nuclear power plants; Gestion del conocimiento en las centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Cal, C. de la; Barasoain, F.; Buedo, J. L.

    2013-03-01

    This article aims to show the importance of knowledge management from different perspectives. In this first part part of the article, the overall approach that performs CNAT of knowledge management is described. In the second part, a specific aspect of knowledge management in ANAV, tacit knowledge transfer is showed. finally, the third part discusses the strategies and actions that are followed in CNCO for knowledge management. All this aims to show an overview of knowledge management held in the Spanish Nuclear Power Plants. (Author)

  13. Impacts of Photovoltaic Power Plant Sitings and Distributed Solar Panels on Meteorology and Air Quality in Central California

    Science.gov (United States)

    Bastien, L. A.; Jin, L.; Brown, N. J.

    2012-12-01

    California's electric utility companies are required to use renewable energy to produce 20% of their power by 2010 and 33% by 2020. A main source of the power will be solar energy because photovoltaic technologies have advanced so much that large scale installations are being built and will be built in the future with even greater capacity. Rather than being a large emission source, these plants affect the ambient environment through albedo changes and by emission reductions associated with not burning fossil fuels to generate the same amount of electricity. Like conventional power plants, their impact on local meteorology and air quality depends on the specific technology, ambient atmospheric conditions, and the spatial location of the plant. Also, as solar panels on commercial and residential rooftops become even more common, the effect of distributed photovoltaic panels on meteorology and air quality is likely to become significant. In this study, we use the Weather Research and Forecasting (WRF) model and the Community Multiscale Air Quality (CMAQ) model at high resolution of 4 km x 4 km over several 5-day high-ozone episodes of the summer 2000 to assess the impact of photovoltaic panels on meteorology and air quality in Central California. We investigate the effect of locating a 1.0 Giga watt solar plant in different locations and the effect of distributed rooftop photovoltaic panels in major Californian cities, with a focus on peak and 8-hour average ozone and 24-hour average PM2.5.

  14. Solar thermal power plants

    International Nuclear Information System (INIS)

    The solar thermal power plant technology, the opportunities it presents and the developments in the market are outlined. The focus is on the technology of parabolic trough power plants, a proven technology for solar power generation on a large scale. In a parabolic trough power plant, trough-shaped mirrors concentrate the solar irradiation onto a pipe in the focal line of the collector. The thermal energy thus generated is used for electricity generation in a steam turbine. Parabolic trough plants can be combined with thermal storage and fossil or biomass fired heat exchangers to generate electricity even when the sun is not shining. Solar Millennium AG in Erlangen has developed the first power plant of this kind in Europe. After two years of construction the plant started operation in Southern Spain in 2008. This one and its sister projects are important steps leading the way for the whole market. The paper also covers the technological challenges, the key components used and the research and development activities concerning this technology. Solar thermal power plants are ideal for covering peak and medium loads in power grids. In hybrid operation they can also cover base-load. The Solar Chimney power plant, another striking technology for the conversion of solar into electric energy, is described briefly. The paper concludes with a look at the future - the import of solar energy from the deserts of North Africa to central Europe. (author)

  15. CENTRAL ASIA'S POWER DILEMMAS

    OpenAIRE

    Budkin, Viktor

    2006-01-01

    It turned out to be much harder to create new power structures in Central Asia than elsewhere in the post-socialist world: no matter how hard it was for the Central European countries to acquire new political institutions, their advance toward the Western democratic model was much smoother. In the European part of the post-Soviet geopolitical expanse, Russia, Ukraine, and Moldova experienced fewer problems than the Central Asian region (CAR for short), though they too had their share of contr...

  16. Electrochemical techniques application in corrosion problems of fossil power plants; Aplicacion de tecnicas electroquimicas en problemas de corrosion en centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Cano Castillo, Ulises; Garcia Ochoa, Esteban Miguel; Martinez Villafane, Alberto; Mariaca Rodriguez, Liboria; Malo Tamayo, Jose Maria; Uruchurtu Chavarin, Jorge [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1990-12-31

    Some aspects of the electrochemical techniques employed to evaluate the corrosion at low temperature in fossil power plants are commented, as well as the results obtained with the application of them in three power plants of this type. [Espanol] Se comentan algunos aspectos de tecnicas electroquimicas utilizadas para evaluar la corrosion en baja temperatura en centrales termoelectricas, asi como los resultados de la aplicacion de las mismas en tres centrales de este tipo.

  17. Central receiver solar thermal system. Phase 1, CDRL item 10. Second quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1976-04-01

    Results of analysis and design efforts are summarized. This is the second quarterly technical progress report published on the Phase 1 Central Receiver Solar Thermal Power System contract. The dominant activities during the reporting period have involved the detailed definition of the subsystem research experiments and the design of the test articles and test facilities. Summaries of these activities are presented. Design changes to the 10-MWe pilot plant preliminary design baseline which have occurred during the report period are also described.

  18. Feasibility of the operation CFE`s conventional power plants for industrial cogeneration; Factibilidad de operar las centrales termoelectricas convencionales de la CFE para cogeneracion industrial

    Energy Technology Data Exchange (ETDEWEB)

    Buendia Dominguez, Eduardo H.; Acosta Torres, Rosa Aracely [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    An analysis is made on how cogeneration could help to maximize the power plant performance since thanks to cogeneration this type of power plants could utilize a part of the waste energy to be supplied to other processes. Also mention is made of the utilization of computer programs to help the design and the realization of functioning tests of this type of power plants. An economic evaluation is presented on the feasibility of operating this type of power plants as cogeneration units and it is concluded that the operation of fossil power plants in the cogeneration mode is not affected by the site where the power plant is located [Espanol] Se analiza como la cogeneracion podria ayudar a maximizar el rendimiento de las centrales termoelectricas ya que gracias a la cogeneracion este tipo de centrales podrian utilizar una parte de la energia desechada para suministrarla a otros procesos. Tambien se menciona la utilizacion de programas de computo para auxiliar en el diseno o realizacion de pruebas de funcionamiento sobre este tipo de plantas. Se presenta una evaluacion economica sobre la factibilidad de operar este tipo de plantas como unidades de cogeneracion y se concluye en que la operacion de centrales termoelectricas en modo de cogeneracion no se ve afectado por el sitio donde se encuentra la central

  19. Solar central electric power generation - A baseline design

    Science.gov (United States)

    Powell, J. C.

    1976-01-01

    The paper presents the conceptual technical baseline design of a solar electric power plant using the central receiver concept, and derives credible cost estimates from the baseline design. The major components of the plant - heliostats, tower, receiver, tower piping, and thermal storage - are discussed in terms of technical and cost information. The assumed peak plant output is 215 MW(e), over 4000 daylight hours. The contribution of total capital investment to energy cost is estimated to be about 55 mills per kwh in mid-1974 dollars.

  20. Theoretical and experimental investigation of a Moving Bed Heat Exchanger for Solar Central Receiver Power Plants

    International Nuclear Information System (INIS)

    A Moving Bed Heat Exchanger for heat extraction from solar heated granular materials is investigated with respect to flow behaviour. To overcome limitations of existing empirical models, a numerical CFD model is established and parametrised with the help of experiments. Parametric studies are performed to quantify the effect of inlet velocities on the velocity field. A good agreement with an empirical model is found. Also, a comparison with PIV measurements confirms its validity, making it a solid basis for future design work.

  1. Advanced Thermal Storage for Central Receivers with Supercritical Coolants

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, Bruce D.

    2010-06-15

    The principal objective of the study is to determine if supercritical heat transport fluids in a central receiver power plant, in combination with ceramic thermocline storage systems, offer a reduction in levelized energy cost over a baseline nitrate salt concept. The baseline concept uses a nitrate salt receiver, two-tank (hot and cold) nitrate salt thermal storage, and a subcritical Rankine cycle. A total of 6 plant designs were analyzed, as follows: Plant Designation Receiver Fluid Thermal Storage Rankine Cycle Subcritical nitrate salt Nitrate salt Two tank nitrate salt Subcritical Supercritical nitrate salt Nitrate salt Two tank nitrate salt Supercritical Low temperature H2O Supercritical H2O Two tank nitrate salt Supercritical High temperature H2O Supercritical H2O Packed bed thermocline Supercritical Low temperature CO2 Supercritical CO2 Two tank nitrate salt Supercritical High temperature CO2 Supercritical CO2 Packed bed thermocline Supercritical Several conclusions have been drawn from the results of the study, as follows: 1) The use of supercritical H2O as the heat transport fluid in a packed bed thermocline is likely not a practical approach. The specific heat of the fluid is a strong function of the temperatures at values near 400 °C, and the temperature profile in the bed during a charging cycle is markedly different than the profile during a discharging cycle. 2) The use of supercritical CO2 as the heat transport fluid in a packed bed thermocline is judged to be technically feasible. Nonetheless, the high operating pressures for the supercritical fluid require the use of pressure vessels to contain the storage inventory. The unit cost of the two-tank nitrate salt system is approximately $24/kWht, while the unit cost of the high pressure thermocline system is nominally 10 times as high. 3) For the supercritical fluids, the outer crown temperatures of the receiver tubes are in the range of 700 to 800 °C. At temperatures of 700 °C and above

  2. Heat pipe central solar receiver. Volume I. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Bienert, W. B.; Wolf, D. A.

    1979-04-01

    The objective of this project was the conceptual design of a Central Solar Receiver Gas Turbine Plant which utilizes a high temperature heat pipe receiver. Technical and economic feasibility of such a plant was to be determined and preliminary overall cost estimates obtained. The second objective was the development of the necessary heat pipe technology to meet the requirements of this receiver. A heat pipe receiver is ideally suited for heating gases to high temperatures. The heat pipes are essentially loss free thermal diffusers which accept a high solar flux and transform it to a lower flux which is compatible with heat transferred to gases. The high flux capability reduces receiver heating surface, thereby reducing receiver heat losses. An open recuperative air cycle with a turbine inlet temperature of 816/sup 0/C (1500/sup 0/F) was chosen as the baseline design. This results in peak metal temperatures of about 870/sup 0/C (1600/sup 0/F). The receiver consists of nine modular panels which form the semicircular backwall of a cavity. Gas enters the panels at the bottom and exits from the top. Each panel carries 637 liquid metal heat pipes which are mounted at right angle to the gas flow. The evaporators of the heat pipes protrude from the flux absorbing front surface of the panels, and the finned condensors traverse the gas stream. Capital cost estimates were made for a 10 MW(e) pilot plant. The total projected costs, in mid-1978 dollars, range from $1,947 to $2,002 per electrical kilowatt. On the same basis, the cost of a water/steam solar plant is approximately 50% higher.

  3. Nuclear power plants

    International Nuclear Information System (INIS)

    Data concerning the existing nuclear power plants in the world are presented. The data was retrieved from the SIEN (Nuclear and Energetic Information System) data bank. The information are organized in table forms as follows: nuclear plants, its status and type; installed nuclear power plants by country; nuclear power plants under construction by country; planned nuclear power plants by country; cancelled nuclear power plants by country; shut-down nuclear power plants by country. (E.G.)

  4. Numerical simulation of solar radiation transmission process for the solar tower power plant: From the heliostat field to the pressurized volumetric receiver

    International Nuclear Information System (INIS)

    In the present work, a concentrating and collecting subsystem optical model for the solar tower power plant is fully developed and the corresponding solar radiation transmission process from heliostat field to the pressurized volumetric receiver (PVR) is simulated by the in-house developed Monte Carlo Ray Tracing (MCRT) code. Based on the above model, the optical efficiency of heliostat field and the local heat flux distribution within the SiC absorber are calculated, and then the influences of time and date, receiver mounting height and heliostats tracking error on the radiation transmission and absorption process are also investigated. The computation results show that, the heat flux distribution within the SiC absorber exhibits a great non-uniform characteristic, while the maximum heat flux density at the top area of the absorber is up to 2.58 × 109 W/m3. The variation tendencies of the field efficiency and the maximum heat flux density of the absorber are similar to that of the solar altitude angle during a day or a year. Furthermore, the annual mean field efficiency and the maximum heat flux of the absorber exhibit a rapid decreasing trend as the tracking error increases, but show a little increasing trend as the receiver mounting height increases. -- Highlights: • Solar radiation transmission process from heliostat field to the pressurized volumetric receiver is simulated by MCRT method. • The optical efficiency of the heliostat field and local heat flux distribution within the SiC absorber are calculated. • The influences of system parameters on the radiation transmission and absorption process are also investigated

  5. Analyses of occupational radiation exposure received at Gundremmingen nuclear power station, and its implications on the design of current and future power plants

    International Nuclear Information System (INIS)

    In 1976, the 250 MW Gundremmingen nuclear power station (KRB) completed its first decade of operation. The accumulated activity built-up due to corrosion products in the primary system, the condition of the plant and the methods of radiation work management determine the occupational exposure. The development and the general features of these three parameters are presented in detail. Job related exposure accounting has proven to be an effective means of radiation management. By this means up to 90% of the total radiation exposure could be traced with an accuracy of about 10 mrem. It is shown that up to 40% of the total exposure originate not from primary work but from associating jobs, e.g. work area preparation and testing efforts. Especially in this field a remarkable reduction of the occupational dose rate can be achieved by precise planning. The ten-year radiation protection history of KRB served as a design basis with the objective to reduce occupational radiation exposure. Examples are given how this influenced not only the design of relevant systems but also their accomodation, arrangement and shielding with regard to maintenance and repair work during reactor outage. Physical separation of the components and valves from the associated actuators, controls and instruments was provided to reduce personnel radiation exposure during plant operation. Provisions were also made to avoid contamination of the building atmosphere and to reduce the release of radioactivity via the ventilation systems

  6. Study of the influence of central nuclear power plants at Valdaliga (Civitavecchia) on the chemical composition of local rain

    International Nuclear Information System (INIS)

    Data from a wet deposition sampling over the area collocated nearby Civitavecchia power plants are here presented and discussed. In order to establish the possible influence of the power plants emission on the chemical composition of the rain collected, the experimental data have been correlated with synoptic and local meteorological conditions. (author)

  7. Owners of nuclear power plants

    International Nuclear Information System (INIS)

    The list indicates percentage ownership of commercial nuclear power plants by utility companies as of September 1, 1982. The list includes all plants licensed to operate, under construction, docketed for NRC safety and environmental reviews, or under NRC antitrust review. Part I lists plants alphabetically with their associated applicants and percentage ownership. Part II lists applicants alphabetically with their associated plants and percentage ownership. Part I also indicates which plants have received operating licenses

  8. Miniature thermoelectric power plant

    OpenAIRE

    Moreira, António H. J.; Freitas, Ricardo; Esteves, João Sena

    2006-01-01

    This paper describes a miniature thermoelectric power plant made with the boiler and the water pump from an old starch iron. It also uses a computer cooling fan, which serves as electric power generator. The boiler vaporizes the water it receives from the water pump. Then, the steam is injected over the turbine of the fan making it twirl. The voltage generated by the fan is enough to lighten a couple of LEDs. A wooden case with a chimney encloses all the referred devices.

  9. Miniature thermoelectric power plant

    OpenAIRE

    Moreira, António, 1957-; Freitas, Ricardo; Sepúlveda, João; Esteves, João Sena

    2010-01-01

    This paper describes a miniature thermoelectric power plant made with the boiler and the water pump from an old starch iron. It also uses a computer cooling fan, which serves as electric power generator. The boiler vaporizes the water it receives from the water pump. Then, the steam is injected on the turbine of the fan, making it twirl. The voltage generated by the fan is enough to lighten a couple of LEDs. A wooden case with a chimney encloses all the referred devices.

  10. Nuclear power plant of Fessenheim: evaluation of the seismic risk; Centrale Nucleaire de Fessenheim: appreciation du risque sismique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The seismic risk taken into account during the sizing of the nuclear power plant of Fessenheim seems to have been under evaluated at this time. The revaluation of the seismic risk, as proposed, until this day by EDF in order to the third ten-year visit of the power plant, planned for 2009, leads to a significant under evaluation of the risk and then is not acceptable. The present expertise details point by point the weaknesses of these revaluation. The power plant has been sized in an elastic manner that is generally strongly for the safety side. It is imperative to proceed the most quickly as possible to a deep control of the seismic resistance of the power plant of Fessenheim and then after having proceeded to a revision of the seismic risk in taking into account the actual knowledge in this field. (N.C.)

  11. Kansas Power Plants

    Data.gov (United States)

    Kansas Data Access and Support Center — The Kansas Power Plants database depicts, as point features, the locations of the various types of power plant locations in Kansas. The locations of the power...

  12. Solar central receiver prototype heliostat CDRL item B. d. Final technical report, Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Easton, C. R.

    1978-08-01

    This is volume II of a two volume report which presents the results of a study to define a low-cost approach to the production, installation, and operation of heliostats for central receiver solar thermal power plants. Performance and cost analyses are presented, and critical R and D areas are identified. Also, computer printed work sheets are included for heliostat investment, maintenance equipment investment, initial spares investment, and first years operations and maintenance for 2,500, 25,000, 250,000, and 1,000,000 units per year production. (WHK)

  13. The stress tests performed by the Spanish nuclear power plants.; Las pruebas de resistencia realizadas a las centrales nucleares espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Alonso, J. R.

    2011-07-01

    In the wake of the accident that occurred at Fukushima nuclear power plant in Japan, the European Union decided to subject the European plants to a reassessment of their safety margins, in accordance with the lessons learned from that accident. On December 31st last, following a process of exhaustive analysis, the Nuclear Safety Council submitted the final reports corresponding to the evaluations performed by the Spanish nuclear power plants, with the results obtained and conclusions drawn. Also detailed are the actions proposed to improve the nuclear safety of these facilities in response to extreme situations. (Author)

  14. Environmental management systems implemented in the Spanish nuclear power plants; Sistemas de gestion ambiental implantados en las centrales nucleares espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Redondo, R.; Fernandez Guisado, M. B.; Hortiguela, R.; Bustamante, L. F.; Esparza, J. L.; Villareal, M.; Yague, F.

    2013-09-01

    The companies that own the Spanish Nuclear Power Plants, aware of social concern and in the context of a growing demanding environmental legislation, have a permanent commitment to the electricity production based on the principles of a maximum respect for the environment, safety, quality, professionalism and continuous improvement. In order to minimize the environmental impact of their plants they have implemented and Environmental Management System based on the ISO 14001 Standard. They minimize the environmental impact by identifying the significant environmental aspects and defining the corresponding objectives. This article describes the referred environmental management systems and their environmental objectives, as applied and defined by the Spanish Nuclear Power Plants. (Author)

  15. Foreseeing techniques and control of emissions in thermal power plants. Workshop Latin American. [Selected Papers]; Control y tecnicas de prevision de las emisiones de centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Saldana, R.; Morales, F.; Urrutia, M. [eds.] [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1996-12-31

    This document contains the conference proceedings of the Latin-American Workshop ``Control and Prevision Techniques of Emissions in Power Plants`` carried out in Cuernavaca, Mexico on June 1996, with the participation of representatives of Argentina, Chile, Guatemala, Colombia, Ecuador, Mexico, Nicaragua, Panama and Venezuela, as well as specialists from the European Union. The core issue analyzed in this workshop was the control and the evaluation techniques of polluting emissions in Power Plants [Espanol] Este documento contiene las memorias de conferencia del Taller Latinoamericano ``Control y tecnicas de prevision de las emisiones de centrales termoelectricas`` que se llevo a cabo en Cuernavaca, Mexico en junio de 1996. Participaron representantes de Argentina, Chile, Guatemala, Colombia, Ecuador, Mexico, Nicaragua, Panama y Venezuela, asi como especialistas de la Union Europea. El tema central tratado en este taller fue el control y tecnicas de evaluacion de las emisiones contaminantes en centrales termoelectricas

  16. Wind power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stiller, W.

    1980-01-01

    Wind power plants have practically faded into oblivion in Germany. These wind power plants are systems converting wind power into other usable energy forms, mainly into electric current. The irregularity of wind currents requires storage of the energy produced. The cost situation is calculated for a small wind power plant.

  17. Analysis of pumping systems to large flows of cooling water in power plants; Analisis de sistemas de bombeo para grandes flujos de agua de enfriamiento en centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez Sanchez, Ramon; Herrera Velarde, Jose Ramon; Gonzalez Sanchez, Angel [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)]. E-mail: rsanchez@iie.org.mx; jrhv@iie.org.mx; ags@iie.org.mx

    2010-11-15

    Accurate measurement of large water flows remains being a challenge in the problems of implementation of circulating water systems of power plants and other applications. This paper, presents a methodology for the analysis in pumping systems with high rates of water in power plants, as well as their practical application and results in pipelines water flow of a thermoelectrical power plant of 350 MW. In this power plant, the water flow per pipeline for a half of condenser oscillates around 7 m{sup 3}/s (14 m{sup 3}/s per power generating unit). In this analysis, we present the techniques used to measure large flows of water with high accurately, as well as the computational model for water circulating system using PIPE FLO and the results of practical application techniques. [Spanish] La medicion precisa de grandes flujos de agua, sigue siendo un reto en los problemas de aplicacion de sistemas de agua de circulacion de centrales termoelectricas, entre otras aplicaciones. En este articulo, se presenta una metodologia para el analisis de sistemas de bombeo con grandes flujos de agua en centrales termoelectricas, asi como, su aplicacion practica y los resultados obtenidos en los ductos de agua de circulacion de una central generadora con unidades de 350 MW. En esta central, los flujos por caja de agua oscilan alrededor de los 7 m{sup 3}/s (14 m{sup 3}/s por unidad generadora). En el analisis, se presentan las tecnicas utilizadas para medir con precision grandes flujos de agua (tubo de Pitot), asi como, el modelado del sistema de agua de circulacion por medio de un paquete computacional (PIPE FLO) y resultados obtenidos de la aplicacion de dichas tecnicas.

  18. Power Plant Cycling Costs

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  19. Forecasting of efficiency of solar and solar-fuel power plants with Stirling engines in the conditions of Central Asia

    International Nuclear Information System (INIS)

    Accounting method of electricity generation by solar power plant with Stirling engine (SPP) with taking into account of real duration of solar radiance is worked out. The calculation of SPP productivity on the basis of many years observations in Tashkent is done. The fuel economy while SPP is working at combined solar-fuel regime is estimated. author). 8 refs., 2 figs., 1 tab

  20. Inertial-confinement fusion central-station electric-power-generating plant. Final report, March 1, 1979-September 30, 1980

    International Nuclear Information System (INIS)

    This report contains a complete description of the subsystems of the power plant including driver, driver power supply, pellet fabrication, pellet injection and aiming, data handling and control, evacuation, tritium and radwaste handling, first wall protection, first wall and structure, heat removal, tritium breeding and neutron shielding, maintenance and repair and balance of plant. In addition, it contains analytic support for the conceptual designs developed for each subsystem. The emphasis of the effort was on designing a viable reactor cavity and on solving the problems of interfacing the driver systems with the reactor cavity. The reactors generate 3500 MWt by irradiating a pellet whose gain is 175 from two opposite sides with a total of 2 MJ driver energy at a 10 Hz repetition rate. Because the nominal laser driver efficiency is 10% and that for the heavy ion driver is 30%, the net electric power outputs are 1207 MWe and 1346 MWe; the net plant conversion efficiencies are 28.1% and 31.3%; and the recirculating fractions are 22.9% and 14.0% respectively. The increased power output is, however, only one of the factors considered by utilities in performing a cost minimization analysis of competing power sources for system expansion. These other factors include: capital costs, cost of construction time, operating costs, environmental and licensing costs and reliability cost

  1. Inertial-confinement fusion central-station electric-power-generating plant. Final report, March 1, 1979-September 30, 1980

    International Nuclear Information System (INIS)

    This report contains a complete description of the subsystems of the power plant including driver, driver power supply, pellet fabrication, pellet injection and aiming, data handling and control, evacuation, tritium and radwaste handling, first wall protection, first wall and structure, heat removal, tritium breeding and neutron shielding, maintenance and repair and balance of plant. In addition, it contains analytic support for the conceptual designs developed for each subsystem. The emphasis of the effort was on designing a viable reactor cavity and on solving the problems of interfacing the driver systems with the reactor cavity. The reactors generate 3500 NWt by irradiating a pellet whose gain is 175 from two opposite sides with a total of 2 MJ driver energy at a 10 Hz repetition rate. Because the nominal laser driver efficiency is 10% and that for the heavy ion driver is 30%, the net electric power outputs are 1207 MWe and 1346 MWe; the net plant conversion efficiencies are 28.1% and 31.3%; and the recirculating fractions are 22.9% and 14.0% respectively. The increased power output is, however, only one of the factors considered by utilities in performing a cost minimization analysis of competing power sources for system expansion. These other factors include: capital costs, cost of construction time, operating costs, environmental and licensing costs and reliability cost

  2. Treatment of operational experience of nuclear power plants in WANO; Tratamiento de la experiencia operativa de las centrales nucleares en WANO

    Energy Technology Data Exchange (ETDEWEB)

    Ibanez, M.

    2013-09-01

    The article describes the activities associated to the Operating Experience Programme of the World Association of Nuclear Operators. The programme manages the event reports submitted by the nuclear power plants to the WANO database for the preparation by the Operating Experience Central Team of some documents like the significant Operating Experience Reports and Significant Event Reports that help the stations to avoid similar events. (Author)

  3. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  4. Modernization of electric power systems of the Laguna Verde Nuclear Power Plant; Modernizacion de los sistemas electricos de potencia de la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Gabaldon, M. A.; Gonzalez, J. J.; Prieto, I.

    2011-07-01

    The Power Increase Project of Laguna Verde Nuclear Plant has entailed the replacement, in one unique outage, of the main power electrical systems of the Plant (Isolated Phase Bars, Generator Circuit Breaker and Main Transformer) as well as the replacement of the Turbo-group. The simultaneous substitution of these entire system has never been done by any other Plant in the world, representing an engineering challenge that embraced the design of the new equipment up to the planning, coordination and management of the construction and commissioning works, which were successfully carried out by Iberdrola within the established outage period /47 days) for both units. (Author)

  5. Owners of nuclear power plants

    International Nuclear Information System (INIS)

    The listing indicates percentage ownership of commercial nuclear power plants by utility companies as of August 15, 1977. The list includes all plants operating, under construction, docketed for NRC safety and environmental reviews, or under NRC antitrust review. It does not include those plants announced but not yet under review or those plants formally cancelled. In many cases, ownership may be in the process of changing as a result of antitrust license conditions and hearings, altered financial conditions, changed power needs, and other reasons. However, this list reflects only those ownership percentages of which the NRC has been formally notified. Part I lists plants alphabetically with their associated applicants and percentage ownership. Part II lists applicants alphabetically with their associated plants and percentage ownership. Part I also indicates which plants have received operating licenses

  6. Modular plant of electro chlorination of seawater for nuclear power plants; Planta modular de electrocloracion de agua de mar para centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Dumas, H.; Sesma, J. L.

    2015-07-01

    Iberdola Engineering and Construction has supplied the seawater electro chlorination plant for the EPR of Flamanville 3. The plant produces sodium hypochlorite from the electrolysis of the seawater and injects it continuously to protect the cooling circuits against the marine flora and fauna. As a consequence of the problems faced during the erection of the plant, Iberdola Engineering and construction develops an innovation project to design a modular electro chlorination system for Nuclear Power Plants. The result is a competitive product that reduces significantly the installation costs and the delivery data. (Author)

  7. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  8. Nuclear power plant

    International Nuclear Information System (INIS)

    The present invention provides a nuclear power plant which generates thermoelectric power by utilizing heat generated by fission reaction. Namely, a fuel/thermoelectric material is made of a semiconductor material containing fission products or a semimetal material containing fission products. A reactor container contains the fuel/thermoelectric material and a reactor core constituted by the fuel/thermoelectric material. The reactor container comprises coolants for removing heat generated by nuclear reaction of fission products from the reactor core and a high temperature side electrode connected to a central portion of the fuel/thermoelectric material and a low temperature side electrode connected to the outside of the fuel/thermoelectric material. Electromotive force is caused in the fuel/thermoelectric material by temperature difference upon combustion caused at the central portion and the outer surface of the fuel/thermoelectric material. The electromotive force is taken out of the high temperature side electrode and the low temperature side electrode. (I.S.)

  9. Essent and Ineos realize flexible combined heat and power generating plant; Essent en Ineos realiseren flexibele WKK-centrale

    Energy Technology Data Exchange (ETDEWEB)

    De Groote, Y.

    2008-07-01

    At the Dutch company Ineos Ozide in Zwijndrecht a new combined heat and power plant is supplying steam, electricity and water to various companies at the location since early this year. Due to increased capacity and improved reliability, the location can continue to expand. [mk]. [Dutch] Bij het bedrijf Ineos Oxide in Zwijndrecht levert een nieuwe warmtekrachtcentrale sinds begin dit jaar stoom, elektriciteit en water aan de diverse bedrijven op het terrein. Met de verhoogde capaciteit en verbeterde betrouwbaarheid kan de locatie weer verder groeien.

  10. Complementary assessment of the safety of French nuclear power plants; Evaluations complementaires de surete des centrales nucleaires francaises

    Energy Technology Data Exchange (ETDEWEB)

    Camarcat, N.; Pouget-Abadie, X. [EDF - (France)

    2011-07-15

    As an immediate consequence of the Fukushima accident the French nuclear safety Authority (ASN) asked EDF to perform a complementary safety assessment for each nuclear power plant dealing with 3 points: 1) the consequences of exceptional natural disasters, 2) the consequences of total loss of electrical power, and 3) the management of emergency situations. The safety margin has to be assessed considering 3 main points: first a review of the conformity to the initial safety requirements, secondly the resistance to events overdoing what the facility was designed to stand for, and the feasibility of any modification susceptible to improve the safety of the facility. This article details the specifications of such assessment, the methodology followed by EDF, the task organization and the time schedule. (A.C.)

  11. Solar thermodynamic power plants. The new generation is coming

    International Nuclear Information System (INIS)

    This document presents three main parts. The first part deals with the historical aspects of the thermodynamic solar energy and the sudden interest on the technology with the construction of a new power plants in Nevada. The second part presents the three techniques to concentrate the solar energy in order to produce electric power: the parabolic mirrors, the central receiver system and the cylinder-parabola concentrators. The last part takes stock on the 15 world projects. (A.L.B.)

  12. Communication dated 19 May 2011 received from the Resident Representative of the United Kingdom of Great Britain and Northern Ireland to the Agency regarding Assurance of Supply of Enrichment Services and Low Enriched Uranium for Use in Nuclear Power Plants

    International Nuclear Information System (INIS)

    The Secretariat has received a letter dated 19 May 2011 from the Resident Representative of the United Kingdom of Great Britain and Northern Ireland to the Agency, attaching the Proposal for the Assurance of Supply of Enrichment Services and Low Enriched Uranium for Use in Nuclear Power Plants, as described in document GOV/2011/10. As requested by the Resident Representative, the letter and its attachment are circulated herewith for information of all Member States

  13. Heat pipe central solar receiver. Semiannual progress report, September 1, 1976--May 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Bienert, W. B.; Wolf, D. A.

    1977-09-01

    It is proposed to develop a solar-to-gas heat exchanger for a Central Solar Receiver Power Plant. The concept employs heat pipes to transfer the concentrated solar flux to the gaseous working medium of a Brayton cycle conversion system. During early phases of the program, an open air cycle with recuperator and a turbine inlet temperature of 800/sup 0/C was selected as the optimum design. The predicted cycle efficiency is 33 percent and the overall solar-to-electric efficiency is 20 percent. Three potential receiver configurations were also identified during the initial phases of the program. Optimum heat pipe diameter is approximately 5 cm for all three receiver configurations, and typical lengths are 2 to 3 meters. The required number of heat pipes for a 10 MWe receiver ranges from 2000 to 8000. Heat transport requirements per pipe vary from 4 to 18 Kw. Several wick structures were developed and evaluated in subscale heat pipe tests using sodium as the working fluid. One full scale heat pipe (5 cm diameter by 183 cm long) was developed and tested with sodium as the working fluid.

  14. Power plant chemical technology

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    17 contributions covering topies of fossil fuel combustion, flue gas cleaning, power plant materials, corrosion, water/steam cycle chemistry, monitoring and control were presented at the annual meeting devoted to Power Plant Chemical Technology 1996 at Kolding (Denmark) 4-6 September 1996. (EG)

  15. Nuclear Power Plants. Revised.

    Science.gov (United States)

    Lyerly, Ray L.; Mitchell, Walter, III

    This publication is one of a series of information booklets for the general public published by the United States Atomic Energy Commission. Among the topics discussed are: Why Use Nuclear Power?; From Atoms to Electricity; Reactor Types; Typical Plant Design Features; The Cost of Nuclear Power; Plants in the United States; Developments in Foreign…

  16. The Kuroshio power plant

    CERN Document Server

    Chen, Falin

    2013-01-01

    By outlining a new design or the Kuroshio power plant, new approaches to turbine design, anchorage system planning, deep sea marine engineering and power plant operations and maintenance are explored and suggested. The impact on the local environment, particularly in the face of natural disasters, is also considered to provide a well rounded introduction to plan and build a 30MW pilot power plant. Following a literature review, the six chapters of this book propose a conceptual design by focusing on the plant's core technologies and establish the separate analysis logics for turbine design and

  17. Nuclear power plant simulator

    International Nuclear Information System (INIS)

    In this paper, real time nuclear power plant simulator for student education is described. The simulator is composed of a hybrid computer and an operating console. Simulated power plant is a 36 MWt PWR plant, and the average temperature of the primary coolant within the reactor is controlled to be constant. Reactor Kinetics, fuel temperature, primary coolant temperature, temperature and pressure of steam within the steam generator, steam flow, control rod driving system, and feed water controlling system are simulated. The use of the hybrid computer made it possible to simulate a relatively large scale power plant with a comparatively small size computing system. (auth.)

  18. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  19. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  20. Training-related activities for nuclear power plant personnel in the countries of Central and Eastern Europe and the former Soviet Union. Working material

    International Nuclear Information System (INIS)

    A Technical Cooperation Meeting on Training-Related Activities for NPP Personnel in the Countries of Central and Eastern Europe and the Former Soviet Union was held at the IAEA, Vienna. The main objective of the meeting was to identify, through information exchange and discussion, possible TC projects and assistance related to nuclear power plant (NPP) personnel training, which would meet overall coherent national goals and would demonstrate and important impact and relevance for national policy priorities. An array of such projects were identified for each participating country of the CEEC and FSU as were a number of regional cooperation projects. Refs, figs and tabs

  1. Dynamic instabilities in radiation-heated boiler tubes for solar central receivers

    Science.gov (United States)

    Wolf, S.; Chan, K. C.; Chen, K.; Yadigaroglu, G.

    1982-11-01

    Density-wave instabilities have been investigated in circumferentially nonuniform radiation-heated boiler tubes, simulating solar heating. Analysis and experimental data are presented. The analysis provides the basis for a computer code, STEAMFREQ-I, for the prediction of density-wave instabilities in boiler tubes with imposed heat flux. The key model features include a drift-flux flow model in the boiling region, spatial variation of heat flux, wall dynamics, and variable steam properties in the superheat region. The experimental data include results from two radiation heated boiler panel tests. The data are applicable to central receivers for solar electric power plants. Data for stable and unstable conditions are compared with predictions from STEAMFREQ-I.

  2. Solution to the colloidal silica problem in the San Luis Potosi power plant; Solucion del problema de silice coloidal en la central termoelectrica San Luis Potosi

    Energy Technology Data Exchange (ETDEWEB)

    Lopez Rubalcava, Humberto [Comision Federal de Electricidad (CFE), Mexico, D. F. (Mexico); Mercado, Sergio [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Guerra, Protasio [Comision Federal de Electricidad (CFE), Mexico, D. F. (Mexico)

    1988-12-31

    In June 1986 the Comision Federal de Electricidad (CFE) made tests to raise the load of the first normalized unit of 350 MW of the San Luis Potosi Power Plant; although the new system for colloidal silica removal had not yet been installed, consisting of a hollow fibers ultra-filtration system with a capacity of 110 m{sup 3}, that for the first time would be applied in a Mexican power plant. It was decided to install this system due to the fact that the well water supplying this power plant comes from a geothermal reservoir, with water at 38 degrees Celsius and a silica content of 15 to 250 parts per billion (ppb) of colloidal silica, which makes it necessary to eliminate it in order to enable the boiler operation at its design conditions (175 bars (2573 psig) and 540 degrees Celsius). Although a demineralizing plant existed for the boiler feed water make up, the ion exchange resins were not able to retain the colloidal silica. Also, the First Unit operation was held at 25% of its rated capacity; in trying to raise the output to 50%, the silica concentration in the boiler water went over the allowed limits, resulting in a concentration of 1,500 ppb in the boiler water and 28 ppb in the steam. One the ultra-filtration plant was installed, the power plant operated at full rated capacity with silica concentrations in the steam lower than the permitted concentration, i.e. 10 ppb . By the end of 1987 the Second Unit of 350 MW was put into operation with the ultra-filtration system in operation, reaching full load without any problem. Once confirmed the efficiency of the ultra-filtration for the colloidal silica removal, CFE will apply this system in other power plants of the country having the same problem. [Espanol] En junio de 1986, la Comision Federal de Electricidad (CFE) efectuo pruebas de elevacion de carga en la primera unidad normalizada de 350 MW de la central termoelectrica San Luis Potosi; sin embargo, aun no se terminaba de instalar el nuevo sistema para la

  3. Current status of the Colombia power plants emissions; Estado de las emisiones en las centrales termoelectricas de Colombia

    Energy Technology Data Exchange (ETDEWEB)

    Quijano Hurtado, Ricardo [Ministerio de Minas y Energia, (Colombia)

    1996-12-31

    The characteristics of the Colombian thermal electric resource and the environmental characteristics of the region such as: the climate where the power plants are located; the Geology and the type of soils; the technology employed for the atmospheric emissions control; the water consumption in the region; the systems for ash extraction an social-economical aspects are described [Espanol] Se describen las caracteristicas del parque termico de Colombia y las caracteristicas ambientales de la region como son: el clima donde estan localizadas las plantas; la geologia y los tipos de suelos; la tecnologia utilizada en el control de las emisiones atmosfericas; el consumo de agua en la region; los sistemas de extraccion de cenizas y aspectos socioeconomicos

  4. Environmental management in Chile: The power plants case; Gestion ambiental en Chile: Caso de las centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Jadrijevic, Maritza [Comision Nacional del Medio Ambiente, (Chile)

    1996-12-31

    In this paper are presented the general aspects of the historic evolution o the legal norms on environmental matters in Chile; general aspects of the electric generation system and the instruments of environmental management currently applied in the fossil fueled power plants, such as: the assessment system of the environmental impact; compliance of the air quality and emissions Standards and plans for decontamination [Espanol] En este trabajo se dan a conocer aspectos generales de la evolucion historica de las normas juridicas en materia ambiental en Chile; aspectos generales del sistema de generacion electrica y los instrumentos de gestion ambiental que actualmente se aplican a las plantas de generacion termoelectricas, tales como: el sistema de evaluacion de impacto ambiental; cumplimiento de normas de la calidad de aire y de emision y, planes de descontaminacion

  5. Radiation hygienic assessment of centralized heat and hot water supply of Bilibino village from Bilibin central nuclear heating- and power plant

    International Nuclear Information System (INIS)

    The experience in using an atomic power plant for heat and hot water supply of the village of Bilibino is outlined. Particular attention is given to the population radiation safety. It has been demonstrated that radiation safety of the system is ensured by maintaining fixed pressure levels in the heating media and by the hermetic state of heat exchanges. Water in the heat and hot water supply network meets the requirements for drinking water. Radioactive corrosion products were not detected in the test water. Gamma-radiation dose rate from the surface of heating devices and pipe-lines in the test premises did not exceed the natural background, that is, U.U1-0.025 mrad

  6. Statistical analysis about corrosion in nuclear power plants; Analisis estadistico de la corrosion en centrales nucleares de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Naquid G, C.; Medina F, A.; Zamora R, L. [Instituto Nacional de Investigaciones Nucleares, Gerencia de Ciencia de Materiales, A.P. 18-1027, 11801 Mexico D.F. (Mexico)

    2000-07-01

    Nowadays, it has been carried out the investigations related with the structure degradation mechanisms, systems or and components in the nuclear power plants, since a lot of the involved processes are the responsible of the reliability of these ones, of the integrity of their components, of the safety aspects and others. This work presents the statistics of the studies related with materials corrosion in its wide variety and specific mechanisms. These exist at world level in the PWR, BWR, and WWER reactors, analysing the AIRS (Advanced Incident Reporting System) during the period between 1993-1998 in the two first plants in during the period between 1982-1995 for the WWER. The factors identification allows characterize them as those which apply, they are what have happen by the presence of some corrosion mechanism. Those which not apply, these are due to incidental by natural factors, mechanical failures and human errors. Finally, the total number of cases analysed, they correspond to the total cases which apply and not apply. (Author)

  7. Tri-Lateral Noor al Salaam High Concentration Solar Central Receiver Program

    Energy Technology Data Exchange (ETDEWEB)

    Blackmon, James B

    2008-03-31

    This report documents the efforts conducted primarily under the Noor al Salaam (“Light of Peace”) program under DOE GRANT NUMBER DE-FC36-02GO12030, together with relevant technical results from a closely related technology development effort, the U.S./Israel Science and Technology Foundation (USISTF) High Concentration Solar Central Receiver program. These efforts involved preliminary design, development, and test of selected prototype power production subsystems and documentation of an initial version of the system definition for a high concentration solar hybrid/gas electrical power plant to be built in Zaafarana, Egypt as a first step in planned commercialization. A major part of the planned work was halted in 2007 with an amendment in October 2007 requiring that we complete the technical effort by December 31, 2007 and provide a final report to DOE within the following 90 days. This document summarizes the work conducted. The USISTF program was a 50/50 cost-shared program supported by the Department of Commerce through the U.S./Israel Science and Technology Commission (USISTC). The USISTC was cooperatively developed by President Clinton and the late Prime Minister Rabin of Israel "to encourage technological collaboration" and "support peace in the Middle East through economic development". The program was conducted as a follow-on effort to Israel's Magnet/CONSOLAR Program, which was an advanced development effort to design, fabricate, and test a solar central receiver and secondary optics for a "beam down" central receiver concept. The status of these hardware development programs is reviewed, since they form the basis for the Noor al Salaam program. Descriptions are provided of the integrated system and the major subsystems, including the heliostat, the high temperature air receiver, the power conversion unit, tower and tower reflector, compound parabolic concentrator, and the master control system. One objective of the USISTF program was to conduct

  8. Modernization and power uprate of the Laguna Verde Nuclear Power Plant (Mexico); Modernizacion y aumento de potencia de la Central Nuclear Laguna Verde (Mexico)

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz, L.; Merino, A.; Garcia-Serrano, J. L.

    2012-11-01

    The objective of this project is to perform the modifications on the thermal cycle of the plant required by an Extended Power Update, to achieve a safe and reliable operation of the plant at 120% of its original thermal power. The scope includes the design, engineering, training, supply of equipment, dismantling, installation, testing and commissioning. The duration of the project is 4,5 years (2007-2011), and all the modifications have been implemented in four outages, two per unit. The main modification carried out are the change of the condenser, moisture separator and main steam reheaters, the feedwater haters, the turbogenerator and its auxiliaries, transformers, isolated phase bus and main circuit breaker, etc. In this paper, the results obtained after all the modifications will be introduced. In addition, the most representative experience will be presented, as well as the lessons learned during the Project execution. (Author)

  9. Generalized conventional and intelligent supervisory control system for combined cycle generation power plants; Sistema de control supervisorio generalizado convencional e inteligente para centrales de generacion de ciclo combinado

    Energy Technology Data Exchange (ETDEWEB)

    Martinez Morales, Miguel Angel

    2004-12-15

    The Mexican Electricity Utility (Comision Federal de Electricidad - CFE) growing program in Power Generation for the 2004 - 2008 period is based on Combined Cycle Power Plants (CCPP). In accordance with [CFE, 2000], the expected power generation capacity developed during such period will rise by the amount of 12876 MW, 10655 MW belonging to CCPP (82.75 %). With such important program for the increasing of Power Generation in Mexico, researches have to receive new technologies for CCPP, some of them not completely tested and immature, with the compromise to make then more efficient and reliable. Under such idea and looking to increase the automation level for CCPP with better control algorithms, the Supervisory Generalized Control (SGC) for CCPP was developed in this thesis, based on PID strategies and intelligent (fuzzy) control strategies. With the SGC is possible to get the best performance for the whole CCPP through the automatic starting, synchronizing and loading of the generating units (two gas turbines and one steam turbine) with a minimum participation of operators. To get the increased efficiency, the SGC generates the reference paths for both gas turbines (GT) first, and the steam turbine (ST). The SGC accelerates each unit with a minimum effort and vibrations getting the synchronizing speed in a minimum time and wasted energy. Then the SGC synchronize each unit taking minimum load quickly and loading up to the highest electric power value. All these can be done in an automated operation. The SGC employs two critical-process variable- control strategies, based on blade path temperature average (BPT Average) for Gas Turbines (GT) and the throttle steam pressure for the Steam Turbine (ST). The control algorithms designed take both units, the GT and the ST, picking up load to the highest process value avoiding the alarms activation and shutdown. This is possible only with such an automated control strategy. Test performed showed that with the SGC

  10. Environmental management project of the Patache power plant project and associated transmission line; Gestion ambiental proyecto central termoelectrica Patache y linea de transmision asociada

    Energy Technology Data Exchange (ETDEWEB)

    Carreno Paredes, Cristian [Compania Electrica Tapaca (CELTA, S. A.), (Chile)

    1996-12-31

    This report makes a brief description of the services developed by INGENDESA of the projects executed in the area of engineering as well as in the area of environmental matters. In a second instance a relatively detailed presentation is made of the most important background of the Chilean project: {sup E}nvironmental Management of the Patache Power Plant and the Associated Transmission Line-Compania Electrica Tarapaca (CELTA, S.A.) Region I{sup .} The justification for the construction of the power plant and the environmental problems associated with the same are described [Espanol] En el presente informe se hace una breve presentacion de los servicios desarrollados por INGENDESA, de los proyectos elaborados tanto en el area de la ingenieria como en la tematica ambiental. En segunda instancia, se hace una presentacion relativamente detallada de los antecedentes mas importantes del proyecto chileno {sup G}estion Ambiental Central Patache y Linea de Transmision Asociada - Compania Electrica Tarapaca (CELTA, S.A.) I Region{sup .} Se describe la justificacion de la construccion de esta central termoelectrica y los problemas ambientales asociados a la misma

  11. Statistical analysis of the wind around a nuclear power plant; Analisis estadistico del viento alrededor de una central nucleoelectrica

    Energy Technology Data Exchange (ETDEWEB)

    Tejeda, A; Alvarez, Oscar; Contreras, A. D.; Jauregui, E. [Universidad Veracruzana, (Mexico)

    1996-12-31

    In order to show an appropriate methodology for the climatic analysis of the wind, some of the recent results in the investigation of the field flow around the Laguna Verde Nuclear Power Station, at Veracruz State (Mexico,) through the angular correlation coefficients and contingency tables among the registered wind directions by a meteorological tower at the levels of 10 and 60 meters high are presented. Finally, by applying an objective analysis of the data some conclusions are obtained in connection with the local winds with the mesoscale systems. [Espanol] Con el objeto de mostrar una metodologia apropiada en el analisis climatico del viento, se presentan algunos resultados recientes en la investigacion del campo de flujo en los alrededores de la central nucleoelectrica de Laguna Verde, Veracruz (Mexico), a traves de los coeficientes de correlacion angulares y de tablas de contingencia entre las direcciones del viento registradas por una torre meteorologica en los niveles de 10 y 60 metros de altura. Finalmente, aplicando analisis objetivo de los datos, se obtienen algunas conclusiones sobre la conexion de los vientos locales con los sistemas de mesoescala.

  12. Central Indicent Reporting and Evaluation Office of VGB evaluation of special incidents in nuclear power plants; Auswertung besonderer Vorkommnisse in Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, J.; Grundhoefer, M.; Vallana, G. [VGB Technische Vereinigung der Grosskraftwerksbetreiber e.V., Essen (Germany)

    2000-07-01

    The Central Incident Reporting and Evaluation Office (ZMA) has been founded upon recommendation of the plant managers of German nuclear power plants in 1984 to serve as a central point of information flows at VGB. Since then all incidents have been reported to ZMA that are safety-relevant, have an important bearing on the availability or are of public interest. These incidents are stored in a data base and made available to all member companies for their exchange of experience. Measures taken lead to continual improvements of the plant safety and availability. (orig.) [German] Die 'Zentrale Melde- und Auswertestelle' (ZMA) wurde auf Empfehlung der Betriebsleiter der deutschen Kernrkaftwerke im Jahre 1984 als Drehscheibe der Informationsfluesse bei der VGB eingerichtet. Seitdem werden von den Mitgliedsunternehmen alle Vorkommnisse an die ZMA gemeldet, die sicherheitstechnisch relevant, fuer die Verfuegbarkeit wesentlich oder von oeffentlichem Interesse sind. Diese Vorkommnismeldungen werden in einer Datenbank gespeichert und allen Mitgliedsunternehmen zwecks Erfahrungsaustausch zur Verfuegung gestellt. Die durchgefuehrten Massnahmen fuehren zu kontinuierlichen Verbesserungen der Anlagensicherheit und Verfuegbarkeit. (orig.)

  13. Nuclear power plant construction

    International Nuclear Information System (INIS)

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.)

  14. Technology and power plants

    International Nuclear Information System (INIS)

    In this paper the contributions presented at the 18th IAEA Fusion Energy Conference in the field of technology and power plants are summarised with reference to the following distinct issues: ITER EDA Design, ITER Technology R and D, Progress Towards Advanced Performance and Steady State, Compact Cu Burning Plasma Experiments and Neutron Sources, Advanced Materials Research, Power Plant Design and Economic Forecasts, and Conclusions

  15. Offshore atomic power plants

    International Nuclear Information System (INIS)

    Various merits of offshore atomic power plants are illustrated, and their systems are assessed. The planning of the offshore atomic power plants in USA is reviewed, and the construction costs of the offshore plant in Japan were estimated. Air pollution problem may be solved by the offshore atomic power plants remarkably. Deep water at low temperature may be advantageously used as cooling water for condensers. Marine resources may be bred by building artificial habitats and by providing spring-up equipments. In the case of floating plants, the plant design can be standardized so that the construction costs may be reduced. The offshore plants can be classified into three systems, namely artificial island system, floating system and sea bottom-based system. The island system may be realized with the present level of civil engineering, but requires the development of technology for the resistance of base against earthquake and its calculation means. The floating system may be constructed with conventional power plant engineering and shipbuilding engineering, but the aseismatic stability of breakwater may be a problem to be solved. Deep water floating system and deep water submerging system are conceivable, but its realization may be difficult. The sea bottom-based system with large caissons can be realized by the present civil engineering, but the construction of the caissons, stability against earthquake and resistance to waves may be problems to be solved. The technical prediction and assessment of new plant sites for nuclear power plants have been reported by Science and Technology Agency in 1974. The construction costs of an offshore plant has been estimated by the Ministry of International Trade and Industry to be yen71,026/kW as of 1985. (Iwakiri, K.)

  16. Power plants 2010. Lectures

    International Nuclear Information System (INIS)

    The proceedings include the following lectures: Facing the challenges - new structures for electricity production. Renewable energies in Europe - chances and challenges. Nuclear outlook in the UK. Sustainable energy for Europe. Requirements of the market and the grid operator at the electricity production companies. Perspectives for the future energy production. Pumped storage plants - status and perspectives. Nuclear power/renewable energies -partners or opponents? New fossil fired power stations in Europe - status and perspectives. Nuclear energy: outlook for new build and lifetime extension in Europe. Biomass in the future European energy market - experiences for dong energy. Meeting the EU 20:20 renewable energy targets: the offshore challenges. DESERTEC: sustainable electricity for Europe, Middle East and North Africa. New power plants in Europe - a challenge for project and quality management. Consideration of safely in new build activities of power plants. Challenges to an integrated development in Maasvlakte, Netherlands. Power enhancement in EnBW power plants. Operational experiences of CCS pilot plants worldwide. Two years of operational experiences with Vattenfall's oxyfuel pilot plant. Pre-conditions for CCS. Storage technologies for a volatile generation. Overview: new generation of gas turbines.

  17. Nuclear power plant life extension

    International Nuclear Information System (INIS)

    Current licensing emphasis is different from that existing when older nuclear power plants received their operating licenses. Today, there is increased regulatory focus on utility performance measured through new inspections such as the safety system functional inspection and the safety systems outage modifications inspection; and the use of performance indicators. These programs are intended to identify poorer performing plants and concentrate on improving overall plant performance. This paper discusses how, in an attempt to improve the maintenance performance of the nuclear industry, the U.S. Nuclear Regulatory Commission recently began work on a maintenance rule. In addition, the NRC will require partial probabilistic risk evaluations for each plant that will provide new insights as to a plant's risk. Risk information is being used to prioritize inspections

  18. Ageing of power plants socio-economical, sanitary and environmental impact; Veillissement des centrales Impacts socio-economiques, sanitaires et environnementaux

    Energy Technology Data Exchange (ETDEWEB)

    Bataille, Ch. [Depute du nord (France); Denner, M. [EDF pour la Region Bourgogne (France); Vouilloux, F. [Institut de Radioprotection et de Surete Nucleaire, 92 - Fontenay-aux-Roses (France); Foucher, L. [Direction Generale de la Surete Nucleaire et de la Radioprotection, 75 - Paris (France); Serviere, M. [Electricite de France (EDF), 75 - Paris (France); Vila d' Abadal Serra, M

    2005-07-01

    The National Association of the local Commissions of Information (A.N.C.L.I.) presents a colloquium about the ageing of nuclear power plants. The different following points are presented. The life cycle of nuclear power plants and the new types of reactors. The ageing of power plants: stakes and perspectives for the French and world nuclear park. A power plant of 30 years is it sure? The role of the studies of ageing and the follow-up according to the age. Stop or continue to exploit a nuclear power plant: who decides, when and how. The socio-economic consequences of a stop of power plant: the Spanish experience. Ten-year visits of a power plant: the associative experience. 58 reactors today: how to assume their end of life and welcome equipments to come. (N.C.)

  19. Investigation on the environmental radioactivity of the proposed location for Nuclear Power Plant Station in Ujung Watu area, Central Java

    International Nuclear Information System (INIS)

    During the period of November 1981 and March 1983, preliminary investigation of the environmental radioactivity at the proposed location of nuclear power station in Ujung Watu area in Central Java has been carried out. The investigated area covers an area within a radius of 5 km of the proposed location. During this period a total of about 319 environmental samples which consist of soils, grasses, drinking and surface waters, several food-item of agricultural and sea product have been collected. Measurement of exposure and absorbed dose level were also carried out at 52 and 27 locations within the investigated area. Measurement of exposure dose was carried out using scintillation probe detector coupled to rate meter and absorbed dose level was measured using TL-dosemeter. The samples were analysed for the gross - α and β radioactivity, the content of H-3, Cs-137 and Sr-90. Results showed that the radiation level of the area has a range of 4 ± 18 mR/h with an average of about 4.6 x 1.4 mR/h. Absorbed dose showed a value within the range of 4.5 - 6.9 x 10-7 Gy/day with an average value of 6.2 ± 1.2 x 10-7 Gy/day. The value area is within the normal range of natural level. Measurement of fall-out indicated that the integral impact of Cs-137 and Sr-90 from fall-out to this area were about 2.6 MBq/km2 and 1.5 MBg/km2 respectively. However, no Cs-137 and Sr-90 were detected in the samples collected during this study. (author). 9 refs

  20. Power plant at sea

    International Nuclear Information System (INIS)

    Drilling platforms are rather inefficient when it comes to their own power supply. In view of ecotax and their environmental image, the offshore industry particularly the Norwegians is highly committed to changing this situation. An efficient power plant, specially designed for the offshore industry, might just prove to be the answer to their prayers

  1. Nuclear power plant outages

    International Nuclear Information System (INIS)

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls nuclear power plant safety in Finland. In addition to controlling the design, construction and operation of nuclear power plants, STUK also controls refuelling and repair outages at the plants. According to section 9 of the Nuclear Energy Act (990/87), it shall be the licence-holder's obligation to ensure the safety of the use of nuclear energy. Requirements applicable to the licence-holder as regards the assurance of outage safety are presented in this guide. STUK's regulatory control activities pertaining to outages are also described

  2. LNG plant combined with power plant

    International Nuclear Information System (INIS)

    The LNG plant consumers a lot of power of natural gas cooling and liquefaction. In some LNG plant location, a rapid growth of electric power demand is expected due to the modernization of area and/or the country. The electric power demand will have a peak in day time and low consumption in night time, while the power demand of the LNG plant is almost constant due to its nature. Combining the LNG plant with power plant will contribute an improvement the thermal efficiency of the power plant by keeping higher average load of the power plant, which will lead to a reduction of electrical power generation cost. The sweet fuel gas to the power plant can be extracted from the LNG plant, which will be favorable from view point of clean air of the area. (Author). 5 figs

  3. Plant power supply device in an atomic power plant

    International Nuclear Information System (INIS)

    Object: To avoid tripping of a 6.9 kV class bus line and to decrease a large electric current momentarily flown into a start transformer, in despite of the fact that the bus line is not changed over resulted from actuation of a generator lock-out relay. Structure: An atomic power plant comprising a bus line for a two-system plant power supply and a start transformer receiving power from an exterior system, characterized by the provision of a breaker for effecting the change-over of only one system bus line simultaneously with the reactor scrum and a breaker for effecting the change-over of the other bus line before a generator is tripped as a result of actuation of a generator lock-out relay in a predetermined period of time after the reactor scrum, to thereby reduce the momentary large current to the start transformer. (Kamimura, M.)

  4. Power plants 2002. Lectures

    International Nuclear Information System (INIS)

    Main topics of the meeting: Power economy for the Eastern European countries and their economical growth during overtaking by utilities; climatic change by fossil-fuel power plants; deregulation and competition challenges; cogeneration from fossil fuels and renewable energy sources; research programs for advanced energy systems and problems of certification and regulations; power trade and influence on the operators; air pollution and kyoto protocol and climatic change between policy and engineering tasks. (GL)

  5. Gaussian mixture models as flux prediction method for central receivers

    Science.gov (United States)

    Grobler, Annemarie; Gauché, Paul; Smit, Willie

    2016-05-01

    Flux prediction methods are crucial to the design and operation of central receiver systems. Current methods such as the circular and elliptical (bivariate) Gaussian prediction methods are often used in field layout design and aiming strategies. For experimental or small central receiver systems, the flux profile of a single heliostat often deviates significantly from the circular and elliptical Gaussian models. Therefore a novel method of flux prediction was developed by incorporating the fitting of Gaussian mixture models onto flux profiles produced by flux measurement or ray tracing. A method was also developed to predict the Gaussian mixture model parameters of a single heliostat for a given time using image processing. Recording the predicted parameters in a database ensures that more accurate predictions are made in a shorter time frame.

  6. Kruemmel nuclear power plant

    International Nuclear Information System (INIS)

    This short description of the site and the nuclear power plant with information on the presumable effects on the environment and the general public is to provide some data material to the population in a popular form so that the citizens may in form themselves about the plant. In this description which shall be presented to the safety report, the site, the technical design and the operation mode of the nuclear power plant are described. Some problems of the emission and the effects of radioactive materials as well as other issues related to the plant which are of interest to the public are dealt with. The supposed accidents and their handling are discussed. The description shows that the selected site is suitable for both setting-up and operation of the plant without affecting the safety of the people living there and that in admissible burdens of the environment shall not have to be expected. (orig./HP)

  7. Control of renewable distributed power plants

    OpenAIRE

    Bullich Massagué, Eduard

    2015-01-01

    The main objective of this master thesis is to design a power plant controller for a photo- voltaic (PV) power plant. In a first stage, the current situation of the status of the electrical grid is analysed. The electrical network structure is moving from a conventional system (with centralized power generation, unidirectional power ows, easy control) to a smart grid system consisting on distributed generation, renewable energies, smart and complex control architecture and ...

  8. Reproduction of the flow-power map of the Laguna Verde power plant; Reproduccion del mapa flujo-potencia de la Central Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Amador G, R.; Gonzalez M, V.M. [Comision Nacional de Seguridad Nuclear y Salvaguardias, 03000 Mexico D.F. (Mexico)

    1993-07-01

    The National Commission of Nuclear Safety and Safeguards (CNSNS) requires to have calculation tools which allows it to make analysis independent of the behavior of the reactor core of Laguna Verde nuclear power plant (CNLV) with the purpose to support the evaluation and discharge activities of the fuel recharges licensing. The software package Fms (Fuel Management System) allows to carry out an analysis of the core of the BWR type reactors along the operation cycle to detect possible anomalies and/or helping in the fuel management. In this work it is reproduced the flow-power for the CNLV using the Presto code of the Fms software package. The comparison of results with the map used by the operators of CNLV shows good agreement between them. Another exercise carried out was the changes study that the axial and radial power outlines undergo as well as the thermohydraulic parameters (LHGR, APLHGR, CPR) when moving a control rod. The obtained results show that is had the experience to effect analysis of the reactor behavior using the Presto-Fms code therefore the study of the rest of the software package for the obtention of nuclear parameters used in this code is recommended. (Author)

  9. Revision of by-laws about effluents of EdF's nuclear power plants; Revision des arretes de rejets des centrales nucleaires d'EDF

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    In France, in application of the clean water law from January 3, 1992 and since the decree 95-540 from May 4, 1995, each basic nuclear facility receives a single permission which covers both its water takes and its radioactive and non-radioactive effluents. This decree, initially dedicated to new facilities has been enlarged to all existing installations for which the prefectorial by-laws have reached their date-line. Thus, up to now, five inter-ministerial by-laws have renewed the permissions of water takes and effluents evacuation of the power plants of Saint-Laurent-des-Eaux (Loir-et-Cher), Flamanville (Manche), Paluel (Seine-Maritime), Belleville (Cher) and Saint-Alban (Isere). These by-laws foresee an important abatement of the effluents and concern more particularly the tritium, {sup 14}C, the iodine isotopes and also some other non-radioactive chemical compounds. This document is a compilation of all revised by-laws about effluents and concerning the nuclear power plants listed above. (J.S.)

  10. Central-Receiver Solar-Thermal Power System 10-MW/sub e/ Pilot Plant: collector subsystem manufacturing plan report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-09-15

    The overall manufacturing planning effort included: design modification analysis; manufacturing/tooling conceptual trades; process/tooling verification experiments; and documentation of manufacturing plans and cost estimates. Innovative tooling concepts were evaluated. Studies also included comparison of costs of both field and shop assembly of heliostats.

  11. Terrestrial Solar Thermal Power Plants: On the Verge of Commercialization

    Science.gov (United States)

    Romero, M.; Martinez, D.; Zarza, E.

    2004-12-01

    Solar Thermal Power Plants (STPP) with optical concentration technologies are important candidates for providing the bulk solar electricity needed within the next few decades, even though they still suffer from lack of dissemination and confidence among citizens, scientists and decision makers. Concentrating solar power is represented nowadays at pilot-scale and demonstration-scale by four technologies, parabolic troughs, linear Fresnel reflector systems, power towers or central receiver systems, and dish/engine systems, which are ready to start up in early commercial/demonstration plants. Even though, at present those technologies are still three times more expensive than intermediate-load fossil thermal power plants, in ten years from now, STPP may already have reduced production costs to ranges competitive. An important portion of this reduction (up to 42%) will be obtained by R&D and technology advances in materials and components, efficient integration schemes with thermodynamic cycles, highly automated control and low-cost heat storage systems.

  12. Multiplex Tokamak power plant

    International Nuclear Information System (INIS)

    The concept of multiplexing for a fusion power core as an option for producing power is explored. Superconducting, as well as normal magnet, coils in either first or second stability regimes are considered. The results show that multiplex plants with superconducting magnets operating in the second stability regime could be competitive with the single-unit plants in some unit sizes. The key issues that impact the expected benefits of multiplexing must be investigated further. These are factory fabrication, economy of scale, the extent of equipment sharing, inherent safety, maintainability, and utility load management

  13. Evaluation of the variability of wind speed at different heights and its impact on the receiver efficiency of central receiver systems

    Science.gov (United States)

    Delgado, A.; Gertig, C.; Blesa, E.; Loza, A.; Hidalgo, C.; Ron, R.

    2016-05-01

    Typical plant configurations for Central Receiver Systems (CRS) are comprised of a large field of heliostats which concentrate solar irradiation onto the receiver, which is elevated hundreds of meters above the ground. Wind speed changes with altitude above ground, impacting on the receiver thermal efficiency due to variations of the convective heat losses. In addition, the physical properties of air vary at high altitudes to a significant degree, which should be considered in the thermal losses calculation. DNV GL has long-reaching experience in wind energy assessment with reliable methodologies to reduce the uncertainty of the determination of the wind regime. As a part of this study, DNV GL estimates the wind speed at high altitude for different sites using two methods, a detailed estimation applying the best practices used in the wind energy sector based on measurements from various wind sensors and a simplified estimation applying the power law (1, 2) using only one wind measurement and a representative value for the surface roughness. As a result of the study, a comparison of the wind speed estimation considering both methods is presented and the impact on the receiver performance for the evaluated case is estimated.

  14. GEOTHERMAL POWER GENERATION PLANT

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Tonya

    2013-12-01

    Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196oF resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Cooling water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.

  15. Nuclear Power Plant Technician

    Science.gov (United States)

    Randall, George A.

    1975-01-01

    The author recognizes a body of basic knowledge in nuclear power plant technoogy that can be taught in school programs, and lists the various courses, aiming to fill the anticipated need for nuclear-trained manpower--persons holding an associate degree in engineering technology. (Author/BP)

  16. Modularization in construction processes New Nuclear Power Plants; Modularizacion en procesos de construccion de Nuevas Centrales Nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, I.; Cobos, A.; Herrera Ropero, D.

    2012-07-01

    The aim of this work is that it has the capacity and expertise to analyze the suitability of modular technology design and construction compared to conventional nuclear plants. It will define the criteria for selecting the areas of modularity and the impact on design and its interfaces with engineering, supply, including logistics and construction.

  17. Life cycle management at nuclear power plants; La gestion de la vida util de las centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Diez, R.I.

    2010-07-01

    The Life Management Plan (PGV) consists in a series of actions aimed at improving the reliability and availability of a plant by guaranteeing its operation in safe conditions during its design life while keeping open the option of renewing the operating license in the long term. (Author).

  18. Mini-Central heating and Power Plant (CHP): the choice of the optimal structure and modes of operation

    Science.gov (United States)

    Gil'manshin, I. R.; Konahina, I. A.; Kashapov, N. F.; Fahreev, N. N.

    2014-12-01

    The paper provides an overview of the different types of organizations of mini-CHP, the results of a comparative evaluation of their performance in terms of the variable load. The recommendations to improve power facilities of the mini-CHP on the basis of system analysis methods and the technical and economic optimization are defined.

  19. The crustal structure of south central Mongolia using receiver functions

    Science.gov (United States)

    He, Jing; Wu, Qingju; Sandvol, Eric; Ni, James; Gallegos, Andrea; Gao, Mengtan; Ulziibat, Munkhuu; Demberel, Sodnomsambuu

    2016-06-01

    The crustal thickness H and average crustal velocity ratio k (Vp/Vs) beneath south central Mongolia are investigated using the H-k stacking method based on teleseismic radial receiver functions. Our primary results reveal that the local crustal thickness varies from 38 to 46 km with an average value of 43 km. Thicker crust is found beneath the western Hentey Mountains, while thinner crust is located in the southern area of the Zuunbayan fault zone. The Bouguer gravity anomalies exhibit a strong correlation with the overall crustal thickness pattern throughout most of our study regime. Moreover, a new approach which integrates the Bouguer anomaly gradient and the receiver function-derived crustal thickness is adopted to calculate the density of the lower crust underneath central Mongolia. Fairly dense lower crust of approximately 3000 kg/m3 is found in the Middle Gobi Desert. The measured crustal Vp/Vs ratio ranges from 1.68 to 1.83 with an average value of 1.74. Low Vp/Vs ratio is found beneath the western Hentey Mountains. In general, low Vp/Vs ratios correlate well with regions of quartz-rich crust and high heat flow. High Vp/Vs ratios occur in the Middle Gobi volcanic regions and the Mesozoic Southern Gobi Basin.

  20. The operating staff of nuclear power plants

    International Nuclear Information System (INIS)

    The training of its staff is one of the pillars of the safe and economical operation of a power plant. This is why power plant owners began to systematically train their staff already in the 50s, and why they created central training facilities. Staff members who have undergone this training make an indispensable contribution to the acceptedly high safety and availability of German power plants. The substantial cost of creating training facilities and of schooling plant staff is considered to be an investment for the future. Low labour turnover permits careful observation and development of staff and leads to a high standard of knowledge and experience. (orig./HSCH)

  1. Direct observation of 134Cs and 137Cs in surface seawater in the western and central North Pacific after the Fukushima Dai-ichi nuclear power plant accident

    Directory of Open Access Journals (Sweden)

    H. Kaeriyama

    2013-06-01

    Full Text Available The horizontal distribution of radioactive cesium (Cs derived from the Fukushima Dai-ichi nuclear power plant (FNPP in the North Pacific is still unclear due to the limitation of direct measurement of the seawater in the open ocean. We present the result of direct observation of radioactive Cs in surface seawater collected from a broad area in the western and central North Pacific in July 2011, October 2011 and July 2012. We also conducted a simple particle tracking experiment to estimate the qualitative spatial distribution of radioactive Cs in the North Pacific. 134Cs was detected at 94 stations out of 123 stations, and 137Cs was detected at all stations. High 134Cs and 137Cs concentrations more than 10 m Bq kg−1 were observed in the area of the northern part of Kuroshio Extension at 144° E and 155° E in July 2011, in the area 147–175° E around 40° N in October 2011, and the northern part of Kuroshio Extension at 155° E and 175°30´ E in July 2012. Combining the result of direct observations and particle tracking experiment, the radioactive Cs derived from the FNPP had been dispersed eastward to the central North Pacific during 2011. It was considered from the horizontal distribution that radioactive Cs was dispersed not only eastward but also north- and southward in the central North Pacific. Pronounced dilution process of radioactive Cs from the FNPP during study period is suggested from temporal change in the activity ratio of 134Cs / 137Cs, which was decay-corrected on 6 April 2011, and relationships between radioactive Cs and temperature.

  2. Power plant process computer

    International Nuclear Information System (INIS)

    The concept of instrumentation and control in nuclear power plants incorporates the use of process computers for tasks which are on-line in respect to real-time requirements but not closed-loop in respect to closed-loop control. The general scope of tasks is: - alarm annunciation on CRT's - data logging - data recording for post trip reviews and plant behaviour analysis - nuclear data computation - graphic displays. Process computers are used additionally for dedicated tasks such as the aeroball measuring system, the turbine stress evaluator. Further applications are personal dose supervision and access monitoring. (orig.)

  3. Atmospheric emissions control at ENELVEN`s Ramon Laguna thermal power plant; Control de emisiones a la atmosfera en la central termoelectrica Ramon Laguna de ENELVEN

    Energy Technology Data Exchange (ETDEWEB)

    Rincon Rincon, Edis Rafael [Empresa de Servicio Electrico (ENELVEN), (Venezuela)

    1996-12-31

    ENELVEN is an electric utility that covers the areas of generation, transmission and distribution of the Western an South coast of the Maracaibo Lake of the Zulia State, Venezuela. General aspects of the Ramon Laguna of ENELVEN fossil power plant are presented, as well as the environmental measures implanted in this power station to avoid detrimental effects on the environment that could be caused by the emission of combustion products without the appropriate control, such as particulate matter, sulfur oxides, nitrogen oxides and carbon oxides [Espanol] ENELVEN es una empresa de servicio electrico que cubre las areas de generacion, transmision y distribucion de la Costa Occidental y Sur del Lago de Maracaibo, del Estado Zulia, Venezuela. Se presentan aspectos generales de la planta termoelectrica Ramon Laguna de la empresa ENELVEN, asi como las medidas ambientales implantadas en esta central para evitar efectos adversos sobre el ambiente que pudieran producirse por la emision de productos de la combustion si no existiera el debido control, tales como: particulas, oxidos de azufre, oxidos de nitrogeno y oxidos de carbono

  4. Robotized Inspection of Vertical Structures of a Solar Power Plant Using NDT Techniques

    OpenAIRE

    Torsten Felsch; Gunnar Strauss; Carmen Perez; José M. Rego; Iñaki Maurtua; Loreto Susperregi; Jorge R. Rodríguez

    2015-01-01

    Concentrated solar power (CSP) plants are expansive facilities that require substantial inspection and maintenance. A fully automated inspection robot increases the efficiency of maintenance work, reduces operating and maintenance costs, and improves safety and work conditions for service technicians. This paper describes a climbing robot that is capable of performing inspection and maintenance on vertical surfaces of solar power plants, e.g., the tubes of the receiver in a central tower CSP ...

  5. Quality assurance in central nuclear power plant control systems. (Status report containing proposed enhancements for KTA rules)

    International Nuclear Information System (INIS)

    All enterprises investigated observe the requirements laid down in KTA 1401. In most cases, the quality assurance systems and measures applied even go beyond the requirements of KTA 1401, especially in those enterprises working primarily for export and having to meet foreign quality assurance standards. Quality assurance measures in these enterprises are based primarily on 10 CFR 50, App.B and related rules and standards (e.g. ANSI N 54.2; NUREG 75/087). Internal quality assurance in these enterprises is organized on the basis of graphic flow diagrams which are even presented in the quality assurance manuals. These flow diagrams, in contrast to the German KTA rules, meet the international standards for quality assurance. KTA 1401 requirements not sufficiently met are, e.g. the operator audits with plant producers and unit and equipment producer audits with component producers. The report presents hints for improvements of the quality assurance concept in control systems engineering. (orig./HP)

  6. Modernization of the turbo in the Laguna Verde Nuclear Power Plant; Modernizacion del turbogrupo en la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Liebana, B.; Merino, A.; Cobos, A.; Gonzalez, J. J.

    2010-07-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This paper describes the first phase of the project.

  7. Instrumentation control system in nuclear power plant

    International Nuclear Information System (INIS)

    Purpose: To improve the reliability of instrumentation control system in a nuclear power plant by using an optical fiber cable as a transmission path between a multiplexer and a central control room to thereby eliminate noises resulted from electromagnetic inductions or the likes. Constitution: Signals from neutron detectors are sent by way of ceramic-insulated cables to pre-amplifiers disposed outside of the pressure vessel of a nuclear reactor, converted into voltage pulse signals and then sent by way of coaxial cables to a multiplexer. The multiplexer receives a plurality of voltage pulse signals corresponding to the neutron detectors respectively, converts them into a time-shared electric signal train and sends it to an optical pulse transmitter. The transmitter converts the supplied signals into an optical pulse signal train corresponding to the electric signal train from the multiplexer and sends it by way of an optical fiber cable to an optical pulse receiver disposed in a central control room. (Kawakami, Y.)

  8. Diffusion and dispersion heat of hydrotermal discharge from power plant; Difusion y dispersion de calor de la descarga hidrotermal de una central termoelectrica

    Energy Technology Data Exchange (ETDEWEB)

    Rendon Villalobos, J. Rodolfo

    1996-12-31

    This study describe the numerical simulation results of hydrodynamical behavior of the surface discharge cooling water to the sea incoming from the Tuxpan Power Plant under two different meteorological and oceanographic conditions; Case I, southwest variable winds average speeds of 3 m s-1 and Case II, northwest variable winds average speeds of 11.10 m s-1 . The numerical simulations were made using a three-dimensional model of coastal circulation and heat exchange. The statistical analysis of the wind speed and direction time series measured from January 1, 1981 to December 31, 1983, shows that the larger part of the winds were predominantly from 180 degrees to 315 degrees. Therefore, the southerly winds induce a sea surface circulation towards the north which move the discharged heat water away from the intake. On the contrary, the north winds drives the hydrothermal effluent towards the intake. Comparisons between the numerical simulation results and field data show that under different meteorological and oceanographic conditions, representative of the Tuxpan Site, the model correctly predicts the hydrothermal effluents surface diffusion and Dispersion measured on August 19-20 and 21, 1992 (Case I) and November 26, 1992 (Case II). The model predicts the extent of the impacted areas with cooling water with a precision of {+-} 11%. For all analyzed cases, the real size of the impacted areas that might have adverse effects on the marine ecosystems was not gibber than 0.1 km{sup 2}. Thus, these possible adverse effects are considered to be of local significance only. The simulated vertical profiles of temperature show that the cooling water discharged remains mostly o the surface of the receiving water mass and reaches a maximum depth of 3.5 m. This floatability if a consequence of the low density and small Froude number (Fr << 1), at the discharge, that characterizes the Tuxpan Power Plant Effluent. [Espanol] Este estudio describe los resultados de la simulacion

  9. Nuclear turbine power plant

    International Nuclear Information System (INIS)

    Purpose : To improve the heat cycle balance in a nuclear turbine power plant or the like equipped with a moisture separating and reheating device, by eliminating undesired overcooling of the drains in the pipes of a heat transmission pipe bundle. Constitution : A high pressure turbine is driven by main steams from a steam generator. The steams after driving the high pressure turbine are removed with moistures by way of a moisture separator and then re-heated. Extracted steams from the steam generator or the high pressure turbine are used as a heating source for the reheating. In the nuclear turbine power plant having such a constitution, a vessel for separating the drains and the steams resulted from the heat exchange is provided at the outlet of the reheating device and the steams in the vessel are introduced to the inlet of the moisture separator. (Aizawa, K.)

  10. Nuclear power plant

    International Nuclear Information System (INIS)

    Purpose: To suppress corrosion at the inner surfaces of equipments and pipeways in nuclear power plants. Constitution: An injection device comprising a chemical injection tank and a plunger type chemical injection pump for injecting hydrazine as an oxygen remover and ammonia as a pH controller is disposed to the downstream of a condensate desalter column for primary coolant circuits. Since dessolved oxygen in circuit water injected with these chemicals is substantially reduced to zero and pH is adjuted to about 10 - 11, occurrence of stress corrosion cracks in carbon steels and stainless steels as main constituent materials for the nuclear power plant and corrosion products are inhibited in high temperature water, and of corrosion products are inhibited from being introduced as they are through leakage to the reactor core, by which the operators' exposure does can be decreased significantly. (Sekiya, K.)

  11. Solar power generation by use of Stirling engine and heat loss analysis of its cavity receiver

    Science.gov (United States)

    Hussain, Tassawar

    Since concentrated power generation by Stirling engine has the highest efficiency therefore efficient power generation by concentrated systems using a Stirling engine was a primary motive of this research. A 1 kW Stirling engine was used to generate solar power using a Fresnel lens as a concentrator. Before operating On-Sun test, engine's performance test was conducted by combustion test. Propane gas with air was used to provide input heat to the Stirling Engine and 350W power was generated with 14% efficiency of the engine. Two kinds of receivers were used for On-Sun test, first type was the Inconel tubes with trapped helium gas and the second one was the heat pipe. Heat pipe with sodium as a working fluid is considered the best approach to transfer the uniform heat from the receiver to the helium gas in the heater head of the engine. A Number of On-Sun experiments were performed to generate the power. A minimum 1kW input power was required to generate power from the Stirling engine but it was concluded that the available Fresnel lens was not enough to provide sufficient input to the Stirling engine and hence engine was lagged to generate the solar power. Later on, for a high energy input a Beam Down system was also used to concentrate the solar light on the heater head of the Stirling engine. Beam down solar system in Masdar City UAE, constructed in 2009 is a variation of central receiver plant with cassegrainian optics. Around 1.5kW heat input was achieved from the Beam Down System and it was predicted that the engine receiver at beam down has the significant heat losses of about 900W. These high heat losses were the major hurdles to get the operating temperature (973K) of the heat pipes; hence power could not be generated even during the Beam Down test. Experiments were also performed to find the most suitable Cavity Receiver configuration for maximum solar radiation utilizations by engine receiver. Dimensionless parameter aperture ration (AR=d/D) and aperture

  12. Nuclear power plants

    International Nuclear Information System (INIS)

    Before the economical adaptability of nuclear power plants was achieved, many ways were tried to technically use nuclear fission. In the course of a selection process, of numerous types of reactors, only a few have remained which are now taking part in the competition. The most important physical fundamentals, the occurence of various reactor concepts and the most important reactor types are the explained. (orig./TK)

  13. Nuclear power plant erection

    International Nuclear Information System (INIS)

    The erection of a nuclear power plant covers all the installation operations related to mechanical and electrical equipment in buildings designed for this specific purpose. Some of these operations are described: erection of the nuclear boiler, erection work carried out in the building accomodating the nuclear auxiliary and ancillary equipment and the methods and the organization set up in order to carry out this work satisfactorily are analyzed

  14. Power plant emissions reduction

    Science.gov (United States)

    Anand, Ashok Kumar; Nagarjuna Reddy, Thirumala Reddy

    2015-10-20

    A system for improved emissions performance of a power plant generally includes an exhaust gas recirculation system having an exhaust gas compressor disposed downstream from the combustor, a condensation collection system at least partially disposed upstream from the exhaust gas compressor, and a mixing chamber in fluid communication with the exhaust gas compressor and the condensation collection system, where the mixing chamber is in fluid communication with the combustor.

  15. Power plant design model

    International Nuclear Information System (INIS)

    This paper reports on the Power Plant Design Model (PPDM) which is an interactive FORTRAN/2020 program with over 15,000 lines of code that allows a user to create an engineering model of a grass roots solid fuel-fired facility capable of generating steam for electrical power generation and/or sale. Capital, operating, and maintenance cost estimates of the modeled plant are also generated. The model's technical output contains complete material and energy balances of all major streams, parasitic power calculations, boiler operating data and a major equipment list. The economic output consists of a capital cost estimate for the plant in a spreadsheet format detailing the material, labor and indirect costs associated with each piece of equipment. The model was intended for use as a marketing tool to replace engineering feasibility studies which are needed to determine the viability of a project. The model provides preliminary economics at a fraction of time and manpower effort normally associated with this task

  16. Simulation of an EPRI-Nevada Test Site (NTS) hydrogen burn test at the Central Receiver Test Facility

    International Nuclear Information System (INIS)

    In order to augment results obtained from the hydrogen burn equipment survival tests performed by the Electric Power Research Institute (EPRI) at the Nevada Test Site (NTS), a series of tests was conducted at the Sandia National Laboratories Central Receiver Test Facility (CRTF). The CRTF tests simulated a 13 volume-percent burn from the EPRI-NTS series. During the CRTF tests, the thermal and operational responses of several specimens of nuclear power plant safety-related equipment were monitored when subjected to a solar heat flux simulation of a hydrogen burn. The simulation was conducted with and without steam in the vicinity of the test specimens. Prior to exposure, the specimens were preheated to temperatures corresponding to the precombustion environment in the EPRI-NTS test vessel

  17. Central Andean crustal structure from receiver function analysis

    Science.gov (United States)

    Ryan, Jamie; Beck, Susan; Zandt, George; Wagner, Lara; Minaya, Estela; Tavera, Hernado

    2016-07-01

    The Central Andean Plateau (15°-27°S) is a high plateau in excess of 3 km elevation, associated with thickened crust along the western edge of the South America plate, in the convergent margin between the subducting Nazca plate and the Brazilian craton. We have calculated receiver functions using seismic data from a recent portable deployment of broadband seismometers in the Bolivian orocline (12°-21°S) region and combined them with waveforms from 38 other stations in the region to investigate crustal thickness and crust and mantle structures. Results from the receiver functions provide a more detailed map of crustal thickness than previously existed, and highlight mid-crustal features that match well with prior studies. The active volcanic arc and Altiplano have thick crust with Moho depths increasing from the central Altiplano (65 km) to the northern Altiplano (75 km). The Eastern Cordillera shows large along strike variations in crustal thickness. Along a densely sampled SW-NE profile through the Bolivian orocline there is a small region of thin crust beneath the high peaks of the Cordillera Real where the average elevations are near 4 km, and the Moho depth varies from 55 to 60 km, implying the crust is undercompensated by ~ 5 km. In comparison, a broader region of high elevations in the Eastern Cordillera to the southeast near ~ 20°S has a deeper Moho at ~ 65-70 km and appears close to isostatic equilibrium at the Moho. Assuming the modern-day pattern of high precipitation on the flanks of the Andean plateau has existed since the late Miocene, we suggest that climate induced exhumation can explain some of the variations in present day crustal structure across the Bolivian orocline. We also suggest that south of the orocline at ~ 20°S, the thicker and isostatically compensated crust is due to the absence of erosional exhumation and the occurrence of lithospheric delamination.

  18. Obrigheim nuclear power plant

    International Nuclear Information System (INIS)

    In 1973 the 345 MW pressurized water nuclear power plant at Obrigheim operated on base load, generating approximately 2.63 TWh, approximately 2.5 TWh of which was supplied to the KWO members. The plant availability for the year was 89.9%. Of the 10.1% non-availability, 6.4% (23 d) was caused by refuelling, including inspection, overhaul and repair operations and routine tests carried out in September 1973. 3.3% was due to stoppages for repairs to a steam generator and the two main cooling pumps, while 0.4% resulted from failures in the electrical section of the plant. The plant was shut down seven times in all, including three scrams. The average core burnup at the end of the fourth cycle (1 September 1973) was 18900 MWd/tU, representing an average burnup of approximately 37500 MWd/tU for a fuel element used in all four cycles. The operating performance of the steam generators and the result of the steam generator inspection carried out during refuelling in 1973 suggest no progressive damage. The quantities of radioactive materials released to the environment in 1973 were well below the officially permitted levels. The availability of the plant from the beginning of pilot operation in 1969 to the end of 1973 was 83.7 %

  19. The Marstal Central Solar Heating Plant

    DEFF Research Database (Denmark)

    Heller, Alfred; Jochen, Dahm

    1999-01-01

    The central solar heating plant in Marstal is running since 1996 and has been monitored since. The resulting data from the plant is analysed and the plant performance evaluated. A TRNSYS-model (computersimulation) id prepared and validated based on the measured data from the plant. Acceptable good...

  20. Initiative against nuclear power plants

    International Nuclear Information System (INIS)

    This publication of the Initiative of Austrian Nuclear Power Plant Opponents contains articles on radiactive waste dispoasal in Austria and and discusses safety issues of the nuclear power plant 'Zwentendorf'. (kancsar)

  1. Point-Focusing Solar-Power Distributed Receivers

    Science.gov (United States)

    Lucas, J. W.

    1985-01-01

    Two-volume annual report describes development work aimed at achieving large-scale production of modular, point-focusing distributed receivers (PFDR's) for solar-powered generation of electricity or thermal power for industrial use.

  2. Obrigheim nuclear power plant

    International Nuclear Information System (INIS)

    The gross output of the 345MWe pressurized water nuclear power station at Obrigheim, operation on base load, amounted to about 2.57TWh in 1974, the net power fed to the grid being about 2.44TWh. The core was used to its full capacity until 10 May 1974. Thereafter, the reactor was on stretch-out operation with steadily decreasing load until refuelled in August 1974. Plant availability in 1974 amounted to 92.1%. Of the 7.9% non-availability, 7.87% was attributable to the refuelling operation carried out from 16 August to 14 September and to the inspection, overhaul and repair work and the routine tests performed during this period. The plant was in good condition. Only two brief shutdowns occurred in 1974, the total outage time being 21/2 hours. From the beginning of trial operation in March 1969 to the end of 1974, the plant achieved an availability factor of 85.2%. The mean core burnup at the end of the fifth cycle was 19600 MWd/tonne U, with one fuel element that had been used for four cycles achieving a mean burnup of 39000 MWd/tonne U. The sipping test on the fuel elements revealed defective fuel-rods in a prototype plutonium fuel element, a high-efficiency uranium fuel element and a uranium fuel element. The quantities of radioactive substances released to the environment in 1974 were far below the officially permitted values. In july 1974, a reference preparation made up in the nuclear power station in October 1973 was discovered by outsiders on the Obrigheim municipality rubbish tip. The investigations revealed that this reference preparation had very probably been abstracted from the plant in October 1973 and arrived at the rubbish tip in a most irregular manner shortly before its discovery

  3. An LQ-solution to a control problem associated with a solar thermal central receiver

    Science.gov (United States)

    Sworder, D. D.; Rogers, R. O.

    1983-10-01

    The linearized process dynamics of the steam boiler in a solar-powered central receiver change abruptly when clouds interfere with the sun's rays. The steam temperature regulator used to maintain proper exit steam conditions must control a system with variable structure and discontinuous state trajectories. This paper investigates the quadratic-optimal control of such a system, and gives the design equations for the optimal regulator.

  4. IGALL, key factor in long-term operation of nuclear power plants; IGALL, factor clae en la operacion a largo plazo de centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Calatayud, M. A.; Sainero, J.

    2014-10-01

    The ageing management is a key factor during the Long Term Operation of Nuclear Power Plants and also during the licensed period; IGALL is an international accepted reference guide that shows how the manage it. The knowledge of the reasons to develop this project, how the results have been reached and the public access to them for future use of the Nuclear Power Plants, are the purpose of this article. (Author)

  5. Engineering and maintenance applied to safety-related valves in nuclear power plants; Ingenieria y mantenimiento aplicado a valvulas relacionadas con la seguridad en centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Verdu, M. F.; Perez-Aranda, J.

    2014-04-01

    Nuclear Division in Iberdrola engineering and Construction has a team with extensive experience on engineering and services works related to valves. Also, this team is linked to UNESA as Technical support and Reference Center. Iberdrola engineering and construction experience in nuclear power plants valves, gives effective response to engineering and maintenance works that can be demanded in a nuclear power plant and it requires a high degree of qualification and knowledge both in Operation and Outages. (Author)

  6. Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Analia Bonelli

    2012-01-01

    Full Text Available A description of the results for a Station Black-Out analysis for Atucha 2 Nuclear Power Plant is presented here. Calculations were performed with MELCOR 1.8.6 YV3165 Code. Atucha 2 is a pressurized heavy water reactor, cooled and moderated with heavy water, by two separate systems, presently under final construction in Argentina. The initiating event is loss of power, accompanied by the failure of four out of four diesel generators. All remaining plant safety systems are supposed to be available. It is assumed that during the Station Black-Out sequence the first pressurizer safety valve fails stuck open after 3 cycles of water release, respectively, 17 cycles in total. During the transient, the water in the fuel channels evaporates first while the moderator tank is still partially full. The moderator tank inventory acts as a temporary heat sink for the decay heat, which is evacuated through conduction and radiation heat transfer, delaying core degradation. This feature, together with the large volume of the steel filler pieces in the lower plenum and a high primary system volume to thermal power ratio, derives in a very slow transient in which RPV failure time is four to five times larger than that of other German PWRs.

  7. Analysis of the evolution of the collective dose in nuclear power plants in Spain; Analisis de la evolucion de la dosis colectiva en las centrales nucleares de Espana

    Energy Technology Data Exchange (ETDEWEB)

    Ponjuan Reyes, G.; Ruibia Rodiz, M. A. de la; Rosales Calvo, M.; Labarta Mancho, T.; Calavia Gimenez, I.

    2011-07-01

    This article presents an analysis of the evolution of occupational collective dose of the Spanish nuclear power plants during the period 2000 - 2008 within the international context, by the Nuclear Safety Council (CSN) in order to have information contrasted to assessing the extent of application of the ALARA criteria in the Spanish plants and identify areas of priority attention.

  8. Diagnosis of feed water, condensate and circulation pumps in electric power plants; Diagnostico de bombas de agua de alimentacion, condensado y circulacion en centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Colin Castellanos, Carlos [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1991-12-31

    This article encompasses the analysis and the diagnosis of the pump`s performance that belong to the feed water, condensate and circulation systems of a fossil fuel power plant (FFPP). For this analysis pressure, temperature and flow data were collected by means of field installed instrumentation, as well as these pumps` motors current consumption and voltage values. Later on, the capacity and the pump efficiency are calculated and compared with the design values, to obtain the actual performance of the equipment with the aid of their characteristic curves (Q vs {Delta}H, Q vs {pi}, etc.). [Espanol] Este articulo comprende el analisis y el diagnostico de comportamiento de las bombas, las cuales forman parte de los sistemas de agua de alimentacion, condensado y circulacion de una central termoelectrica (CT). Para el analisis se recopilan datos de presion, temperatura y flujo de la instrumentacion instalada en campo, asi como de los valores de consumo de corriente y de voltaje en los motores de dichas bombas. Posteriormente, se calcula la capacidad y la eficiencia de las bombas en operacion real y se comparan con los valores de diseno, para obtener el comportamiento real del equipo con ayuda de las curvas caracteristicas (Q vs {Delta}H, Q vs {pi}, etcetera).

  9. Garigliano nuclear power plant

    International Nuclear Information System (INIS)

    During the period under review, the Garigliano power station produced 1,028,77 million kWh with a utilization factor of 73,41% and an availability factor of 85,64%. The disparity between the utilization and availability factors was mainly due to a shutdown of about one and half months owing to lack of staff at the plant. The reasons for nonavailability (14.36%) break down as follows: nuclear reasons 11,49%; conventional reasons 2,81%; other reasons 0,06%. During the period under review, no fuel replacements took place. The plant functioned throughout with a single reactor reticulation pump and resulting maximum available capacity of 150 MWe gross. After the month of August, the plant was operated at levels slightly below the maximum available capacity in order to lengthen the fuel cycle. The total number of outages during the period under review was 11. Since the plant was brought into commercial operation, it has produced 9.226 million kWh

  10. Floating nuclear power plants

    International Nuclear Information System (INIS)

    This article examines the legal regime for floating nuclear power plants (FNPs), in view of the absence of specific US legislation and the very limited references to artificial islands in the Law of the Sea Convention. The environmental impacts of FNPs are examined and changes in US regulation following the Three Mile Island accident and recent US court decisions are described. References in the Law of the Sea Convention relevant to FNPs are outlined and the current status of international law on the subject is analysed. (author)

  11. Demonstration tokamak power plant

    Energy Technology Data Exchange (ETDEWEB)

    Abdou, M.; Baker, C.; Brooks, J.; Ehst, D.; Mattas, R.; Smith, D.L.; DeFreece, D.; Morgan, G.D.; Trachsel, C.

    1983-01-01

    A conceptual design for a tokamak demonstration power plant (DEMO) was developed. A large part of the study focused on examining the key issues and identifying the R and D needs for: (1) current drive for steady-state operation, (2) impurity control and exhaust, (3) tritium breeding blanket, and (4) reactor configuration and maintenance. Impurity control and exhaust will not be covered in this paper but is discussed in another paper in these proceedings, entitled Key Issues of FED/INTOR Impurity Control System.

  12. Electrodynamic Wireless Power Transmission to Rotating Magnet Receivers

    International Nuclear Information System (INIS)

    This paper presents an approach for electrodynamic wireless power transmission (EWPT) using a synchronously rotating magnet located in a 3.2 cm3 receiver. We demonstrate wireless power transmission up to 99 mW (power density equal to 31 mW/cm3) over a 5-cm distance and 5 mW over a 20-cm distance. The maximum operational frequency, and hence maximal output power, is constrained by the magnetic field amplitude. A quadratic relationship is found between the maximal output power and the magnetic field. We also demonstrate simultaneous, power transmission to multiple receivers positioned at different locations

  13. Numerical evaluation of the Kalina cycle for concentrating solar power plants

    DEFF Research Database (Denmark)

    Modi, Anish

    Concentrating solar power plants use a number of reflecting mirrors to focus and convert the incident solar energy to heat, and a power cycle to convert this heat into electricity. One of the key challenges currently faced by the solar industry is the high cost of electricity production....... These costs may be driven down by developing more cost-effective plant components and improving the system designs. This thesis focuses on the power cycle aspect of the concentrating solar power plants by studying the use a Kalina cycle with ammonia-water mixtures as the cycle working fluid. The potential...... of using a Kalina cycle is evaluated with a thermoeconomic optimization with a turbine inlet temperature of 500 C for a central receiver solar power plant with direct vapour generation, and 370 C for a parabolic trough solar power plant with Therminol VP-1 as the solar field heat transfer fluid. No thermal...

  14. Advance: research project on aging electrical wiring in nuclear power plants; Advance: proyecto de investigacion de envejecimiento en cableado electrico en centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Cano, J. C.; Ruiz, S.

    2013-07-01

    As Nuclear Power Plants get older it is more important to know the real condition of low voltage, instrumentation, power and control cables. Additionally, as new plants are being built, the election of cables and the use of in-situ monitoring techniques to get reliable aging indicators, can be very useful during the plant life. The goal of this Project is to adapt, optimize and asses Condition Monitoring techniques for Nuclear Power Plants cables. These techniques, together with the appropriate acceptance criteria, would allow specialists to know the state of the cable over its entire length and estimate its residual life. In the Project, accelerated ageing is used in cables installed in European NPPs in order to evaluate different techniques to detect local and global ageing. Results are compared with accepted tests to validate its use for the estimation of cables residual life. This paper describes the main stages of the Project and some results. (Author)

  15. Civil engineering for power plants

    International Nuclear Information System (INIS)

    Power plant structures are conspicuously visible and have an impact on our landscape. In the opinion of a critical public, a successful external design can greatly enhance acceptance of an undertaking and its plants. This paper considers the subjects - utilization of by-products, aggregation of series experience in the construction of nuclear power plants, architecture in power plant construction, water works for adequate cooling water supply and also quality assurance in civil engineering and optimum application of electronic data processing. (orig.)

  16. Energy balances for power plants

    International Nuclear Information System (INIS)

    An important aspect of a power plant is its energy balance, i.e. the electrical energy produced by the plant over its overall operation period, compared to the amount of non-renewable energy used to create and build the plant. Tense discussions took place in the past between criticizers and promotors of a given technology, some technologies even being accused of having a negative energy balance. Mostly based on built examples the present study aims at giving objective data for the represented technologies, as follows: a 64 MW hydro power plant in the Alps, with seasonal water storage in a lake; a 60 MW run-of-river high-head hydro power plant in the Alps; two run-of-river low-head hydro power plants in the Swiss Midlands (14 MW and 25 MW respectively); a small 30 kW wind power generator located near the Simplon Pass at 2000 m over sea level, in the Alps; a 3 kW photovoltaic generator in the roof of a single-family house; a 500 kW photovoltaic power plant in the Jura, at 1000 m over sea level; a 0.9 MWel/8.8 MWtherm fossil-fuel co-generation plant near Zuerich; a 200 MW natural-gas-fired gas/vapour turbine power plant; a 300 MW heavy-fuel-fired power plant; a 500 MW coal-fired power plant; and the Leibstadt 990 MW nuclear power plant. The best energy balances are obtained for the hydro power plants, the worst for the Leibstadt nuclear power plant. In between the photovoltaic plants and the fossil-fuel-fired plants are found. The figures differ by more than two orders of magnitude

  17. Nuclear Power Plant 1996

    International Nuclear Information System (INIS)

    Again this year, our magazine presents the details of the conference on Spanish nuclear power plant operation held in February and that was devoted to 1996 operating results. The Protocol for Establishment of a New Electrical Sector Regulation that was signed last December will undoubtedly represent a new challenge for the nuclear industry. By clearing stating that current standards of quality and safety should be maintained or even increased if possible, the Protocol will force the Sector to improve its productivity, which is already high as demonstrated by the results of the last few years described during this conference and by recent sectorial economic studies. Generation of a nuclear kWh that can compete with other types of power plants is the new challenge for the Sector's professionals, who do not fear the new liberalization policies and approaching competition. Lower inflation and the resulting lower interest rates, apart from being representative indices of our economy's marked improvement, will be very helpful in facing this challenge. (Author)

  18. Power Plant- A Scientific Disaster

    Directory of Open Access Journals (Sweden)

    Dharmateja Bandlamudi, Sahithi Avirneni

    2013-05-01

    Full Text Available The present paper emphasisesthe society’s movement towards improvement of power sector as a pavement of luxury and on the benighted dark side of it. This produces the reasons for enchanting power plant as a scientific disaster. This paper gives the detailed list of effects caused by the power plants mainly on coal fired, nuclear and hydroelectric power plants, their adverse effects on environment and in turn human life.

  19. Small, moveable nuclear power plant

    International Nuclear Information System (INIS)

    Most reliable projections indicate that by the year 2000 approximately 25% of the world's electrical energy and possibly 10% of its process heat for industry will be provided by nuclear power plants. Whilst much of this will come from large nuclear steam raising units-in excess of 900 M.W.(e)-an increasing proportion will be provided from small modular plant, designed for portabiity or mobility. The technical, environmental and economic parameters of such a plant which will usually be of a size around 600 M.W.(e) or less and which in general terms derives its basic design features from nuclear marine propulsion units is reviewed. If suitably standardised, such a nuclear plant, mounted on barges, installed in ships or even airlifted into difficult locations, could provide an attractive solution to the energy problems of developing countries or remote communities. Apart from electrical energy production, the units could operate in a duplex mode to supply steam for central heating, sea-water or bore water distillation or industrial process heat. (Author)

  20. Questions to the reactors power upgrade of the Nuclear Power Plant of Laguna Verde; Cuestionamientos al aumento de potencia de los reactores de la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Salas M, B., E-mail: salasmarb@yahoo.com.mx [UNAM, Facultad de Ciencias, Departamento de Fisica, Circuito exterior s/n, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2014-08-15

    The two reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) were subjected to power upgrade labors with the purpose of achieving 20% upgrade on the original power; these labors concluded in August 24, 2010 for the Reactor 1 and in January 16, 2011 for the Reactor 2, however in January of 2014, the NNP-L V has not received by part of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) the new Operation License to be able to work with the new power, because it does not fulfill all the necessary requirements of safety. In this work is presented and analyzed the information obtained in this respect, with data provided by the Instituto Federal de Acceso a la Informacion Publica y Proteccion de Datos (IFAI) and the Comision Federal de Electricidad (CFE) in Mexico, as well as the opinion of some workers of the NPP-L V. The Governing Board of the CFE announcement that will give special continuation to the behavior on the operation and reliability of the NPP-L V, because the frequency of not announced interruptions was increased 7 times more in the last three years. (Author)

  1. An implantable micropower command receiver for telemetry battery power switching.

    Science.gov (United States)

    Sweeney, J D; Leung, A; Ko, W H

    1981-01-01

    Command receivers that control the functioning of additional implanted circuitry can be useful in many medical telemetry applications. The authors have designed and constructed a thick-film hybrid command receiver system that directly interfaces with the second-generation ICP telemetry system. This command receiver controls telemetry on/off state through enabling/disabling the telemetry pulse generator stage. Lithium battery powering of the implant is made practical through use of this command receiver. An automatic power shutdown feature is incorporated to guard against accidental battery drain. The unit uses two commercial CMOS integrated circuits, a transistor, a resistor and an RF coil. PMID:7295932

  2. Combined cycle power plant Skopje

    International Nuclear Information System (INIS)

    Regarding the new directions in constructing combined cycle power plants, in this work an idea of such plant in Skopje with power of 190 MW has been elaborated. This plant will be constructed on the site of the existing TPP 'Energetika', AD ESM. The rates of efficiency for different condition of operation has been estimated. (Author)

  3. Hybrid combined cycle power plant

    International Nuclear Information System (INIS)

    In case of re-powering the existing pressurised water nuclear power plants by the proposed HCCPP solution, we can increase the electricity output and efficiency significantly. If we convert a traditional nuclear power plant unit to a HCCPP solution, we can achieve a 3.2-5.5 times increase in electricity output and the achievable gross efficiency falls between 46.8-52% and above, depending on the applied solution. These figures emphasise that we should rethink our power plant technologies and we have to explore a great variety of HCCPP solutions. This may give a new direction in the development of nuclear reactors and power plants as well.(author)

  4. Cesium-134 and 137 activities in the central North Pacific Ocean after the Fukushima Dai-ichi nuclear power plant accident

    Directory of Open Access Journals (Sweden)

    J. Kameník

    2013-03-01

    Full Text Available Surface seawater 134Cs and 137Cs samples were collected in the central and western North Pacific Ocean during the 1.5 yr after the Fukushima Dai-ichi nuclear power plant accident to monitor dispersion patterns of these radioisotopes towards the Hawaiian Islands. In the absence of other recent sources and due to its short half-life only those parts of the Pacific Ocean would have detectable 134Cs that were impacted by Fukushima releases. Between March and May 2011, 134Cs was not detected around the Hawaiian Islands and Guam. Here, most 137Cs activities (1.2–1.5 Bq m−3 were in the range of expected preexisting levels. Some samples north of the Hawaiian Islands (1.6–1.8 Bq m−3 were elevated above the 18-month baseline established in surface seawater in Hawaii indicating that those might carry atmospheric fallout. The 18-month time-series analysis of surface seawater from Hawaii did not reveal any seasonal variability or trends, with an average activity of 1.46 ± 0.06 Bq m−3 (Station Aloha, 17 values. In contrast, samples collected between Japan and Hawaii contained 134Cs activities in the range of 1–4 Bq m−3 and 137Cs levels were about 2–3 times above the preexisting activities. We found that the southern boundary of the Kuroshio and Kuroshio extension currents represented a boundary for radiation dispersion with higher activities detected within and north of the major currents. The radiation plume has not been detected over the past 1.5 yr at the main Hawaiian Islands due to the transport patterns across the Kuroshio and Kuroshio extension currents.

  5. Cesium-134 and 137 activities in the central North Pacific Ocean after the Fukushima Dai-ichi Nuclear Power Plant accident

    Directory of Open Access Journals (Sweden)

    J. Kameník

    2013-09-01

    Full Text Available Surface seawater 134Cs and 137Cs samples were collected in the central and western North Pacific Ocean during the 2 yr after the Fukushima Dai-ichi Nuclear Power Plant accident to monitor dispersion patterns of these radioisotopes towards the Hawaiian Islands. In the absence of other recent sources and due to its short half-life, only those parts of the Pacific Ocean would have detectable 134Cs values that were impacted by Fukushima releases. Between March and May 2011, 134Cs was not detected around the Hawaiian Islands and Guam. Here, most 137Cs activities (1.2–1.5 Bq m–3 were in the range of expected preexisting levels. Some samples north of the Hawaiian Islands (1.6–1.8 Bq m–3 were elevated above the 23-month baseline established in surface seawater in Hawaii indicating that those might carry atmospheric fallout. The 23-month time-series analysis of surface seawater from Hawaii did not reveal any seasonal variability or trends, with an average activity of 1.46 ± 0.06 Bq m–3 (Station Aloha, 18 values. In contrast, samples collected between Japan and Hawaii contained 134Cs activities in the range of 1–4 Bq m–3, and 137Cs levels were about 2–3 times above the preexisting activities. We found that the southern boundary of the Kuroshio and Kuroshio extension currents represented a boundary for radiation dispersion with higher activities detected within and north of the major currents. The radiation plume has not been detected over the past 2 yr at the main Hawaiian Islands due to the transport patterns across the Kuroshio and Kuroshio extension currents.

  6. Nuclear emergency buildings of Asco and Vandellos II nuclear power plants; Centros alternativos de emergencias de las centrales nucleares de Asco y Vandellos II

    Energy Technology Data Exchange (ETDEWEB)

    Massuet, J.; Sabater, J.; Mirallas Esteban, S.

    2016-08-01

    The Nuclear Emergency Buildings sited at Asco and Vandellos II Nuclear Power Plants (NPP) are designed to safety manage emergencies in extreme situations, beyond the design basis of the Nuclear Power Plants. Designed in accordance with the requirements of the Spanish Nuclear Regulator (Consejo de Seguridad Nuclear-CSN) these buildings are ready to operate over a period of 72 hours without external assistance and ensure habitability for crews of 120 and 70 people respectively. This article describes the architectural conception, features and major systems of the Nuclear Emergency Buildings sited at Asco and Vandellos II. (Author)

  7. Power plant removal costs

    International Nuclear Information System (INIS)

    The financial, regulatory and political significance of the estimated high removal costs of nuclear power plants has generated considerable interest in recent years, and the political significance has resulted in the Nuclear Regulatory Commission (NRC) eliminating the use of conventional depreciation accounting for the decontamination portion of the removal (decommissioning). While nuclear plant licensees are not precluded from utilizing conventional depreciation accounting for the demolition of non-radioactive structures and site restoration, state and federal utility regulators have not been favorably inclined to requests for this distinction. The realization that steam-generating units will be more expensive to remove, relative to their original cost, predates the realization that nuclear units will be expensive. However, the nuclear issues have overshadowed this realization, but are unlikely to continue to do so. Numerous utilities have prepared cost estimates for steam generating units, and this presentation discusses the implications of a number of such estimates that are a matter of public record. The estimates cover nearly 400 gas, oil, coal and lignite generating units. The earliest estimate was made in 1978, and for analysis purposes the author has segregated them between gas and oil units, and coal and lignite units

  8. Direct Heat-Flux Measurement System (MDF) for Solar central Receiver Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Ballestrin, J.

    2001-07-01

    A direct flux measurement system, MDF, has been designed, constructed and mounted on top of the SSPS-CRS tower at the Plataforma Solar de Almeria (PSA) in addition to an indirect flux measurement system based on a CCD camera. It's one of the main future objectives to compare systematically both measurements of the concentrated solar power, increasing in this way the confidence in the estimate of this quantity. Today everything is prepared to perform the direct flux measurement on the aperture of solar receivers: calorimeter array, data acquisition system and software. the geometry of the receiver determines the operation and analysis procedures to obtain the indecent power onto the defined area. The study of previous experiences with direct flux measurement systems ha been useful to define a new simpler and more accurate system. A description of each component of the MDF system is included, focusing on the heat-flux sensors or calorimeters, which enables these measurements to be done in a few seconds without water-cooling. The incident solar power and the spatial flux distribution on the aperture of the volumetric receiver Hitrec II are supplied by the above-mentioned MDF system. The first results obtained during the evaluation of this solar receiver are presented including a sunrise-sunset test. All these measurements have been concentrated in one coefficient that describes the global behavior of the Solar Power Plant. (Author) 18 refs.

  9. Direct Heat-Flux Measurement System (MDF) for Solar Central Receiver Evaluation

    International Nuclear Information System (INIS)

    A direct flux measurement system, MDF, has been designed, constructed and mounted on top of the SSPSCRS tower at the Plataforma Solar de Almeria (PSA) in addition to an indirect flux measurement system based on a CCD camera. It's one of the main future objectives to compare systematically both measurements of the concentrated solar power, increasing in this way the confidence in the estimate of this quantity. Today everything is prepared to perform the direct flux measurement on the aperture of solar receivers: calorimeter array, data acquisition system and software. The geometry of the receiver determines the operation and analysis procedures to obtain the incident power onto the defined area. The study of previous experiences with direct flux measurement systems has been useful to define a new, simpler and more accurate system. A description of each component of the MDF system is included, focusing on the heat-flux sensors or calorimeters, which enables these measurements to be done in a few seconds without water-cooling. The incident solar power and the spatial flux distribution on the aperture of the volumetric receiver Hitrec II are supplied by the above-mentioned MDF system. The first results obtained during the evaluation of this solar receiver are presented including a sunrise-sunset test. AU these measurements have been concentrated in one coefficient that describes the global behavior of the Solar Power Plant. (Author) 18 refs

  10. Increase of power plant efficiency

    International Nuclear Information System (INIS)

    The increase of power plant efficiency has always been the aim of power plant manufacturers and operators. Today, after the re-orientation of the worldwide market situation, it is necessary to newly assess the power plant efficiency in the field of competition and environment. The average efficiency of power plants presently ranges worldwide at about 30%, yet the status of available technology in the year 2000 permits efficiencies between 45 an 58% depending on the fuels used. VGB PowerTech has been monitoring the technical development of power generation for 80 years up to now. From our point of view, power plant technology still has a great development potential at its disposal. (orig.)

  11. Design of photovoltaic central power station concentrator array

    Energy Technology Data Exchange (ETDEWEB)

    1984-02-01

    A design for a photovoltaic central power station using tracking concentrators has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes an advanced Martin Marietta two-axis tracking fresnel lens concentrator. The concentrators are arrayed in 5 MW subfields, each with its own power conditioning unit. The photovoltaic plant output is connected to the existing 115 kV switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

  12. Brighter for small power plants

    International Nuclear Information System (INIS)

    The article presents a small tunnel drilling machine aimed at using for the construction of small hydroelectric power plants and mentions briefly some advantages economically and environmentally of both the machine and the power production solution

  13. Monitoring systems online of oil for transformers of nuclear power plants; Sistemas de monitorizacion online del aceite para transformadores de potencia de Centrales

    Energy Technology Data Exchange (ETDEWEB)

    Sarandeses, S.

    2014-07-01

    The nuclear power plants are showing their concern due to the existence of recent failures related to the bulky transformers of power. These transformers are not security, but are important for the production of power as its failure can cause transient on the floor, reactor scram or shooting, that can cause interruptions in the production of energy or might force us to reduce the power of production The analysis of gases dissolved in transformer oil is recognized as a trial key to identify a submerged transformer failure in oil. With this analysis it is not possible to ensure that there is no damage in the transformer, but the probability of risk of this type of failure can be reduced. The industry recommended to equip the new large power transformers with oil online monitoring systems and in some cases also be It recommended its use in existing transformers. (Author)

  14. Fukushima, two years later, modification requirements in nuclear power plants; Fukushima, dos anos despues, requerimientos de modificacion en centrales nucleares de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez J, J.; Camargo C, R.; Nunez C, A.; Mendoza F, J. E.; Salmeron V, J. A., E-mail: jerson.sanchez@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Jose Ma. Barragan No. 779, Col. Narvarte, 03020 Mexico D. F. (Mexico)

    2013-10-15

    The occurred events in the nuclear power plant of Fukushima Daiichi as consequence of the strong earthquake of 9 grades in the Richter scale and the later tsunami with waves estimated in more than 14 meters high began a series of important questions about the safety of the nuclear power plants in operation and of the new designs. Firstly, have allowed to be questioned on the magnitudes and consequences of the extreme external natural events; that can put in risk the integrity of the safety barriers of a nuclear power plant when being presented in a multiple way. As consequence of the events of the Fukushima Daiichi NPP, the countries with NPPs in operation and /or construction carried out evaluations about their safety operation. They have also realized evaluations about accidents and their impact in the safety, analysis and studies too that have forced to the regulatory bodies to continue a systematic and methodical revision of their procedures and regulations, to identify the possible improvements to the safety in response to the events happened in Japan; everything has taken it to determine the necessity to incorporate additional requirements to the nuclear power plants to mitigate events Beyond the Design Base. Due to Mexico has the nuclear power plant of Laguna Verde, with two units of BWR-5 type with contention Mark III, some the modifications can be applicable to these units to administrate and/or to mitigate the consequences of the possible occurrence of an accident Beyond the Design Base and that could generate a severe accident. In this work an exposition is presented on the modification requirements to confront external natural events Beyond the Design Base, and its application in our country. (Author)

  15. Study of CO{sub 2} capture processes in power plants; Etude de procedes de captage du CO{sub 2} dans les centrales thermiques

    Energy Technology Data Exchange (ETDEWEB)

    Amann, J.M

    2007-12-15

    The aim of the present study is to assess and compare various processes aiming at recover CO{sub 2} from power plants fed with natural gas (NGCC) and pulverized coal (PC). These processes are post-combustion CO{sub 2} capture using chemical solvents, natural gas reforming for pre-combustion capture by methanol and oxy-fuel combustion with cryogenic recovery of CO{sub 2}. These processes were evaluated using the process software Aspen PlusTM to give some clues for choosing the best option for each type of power plant. With regard to post-combustion, an aqueous solution based on a mixture of amines (N-methyldiethanolamine (MDEA) and triethylene tetramine (TETA)) was developed. Measurements of absorption were carried out between 298 and 333 K in a Lewis cell. CO{sub 2} partial pressure at equilibrium, characteristic of the CO{sub 2} solubility in the solvent, was determined up to 393 K. The solvent performances were compared with respect to more conventional solvents such as MDEA and monoethanolamine (MEA). For oxy-fuel combustion, a recovery process, based on a cryogenic separation of the components of the flue gas, was developed and applied to power plants. The study showed that O{sub 2} purity acts on the CO{sub 2} concentration in the flue gas and thus on the performances of the recovery process. The last option is natural gas reforming with CO{sub 2} pre-combustion capture. Several configurations were assessed: air reforming and oxygen reforming, reforming pressure and dilution of the synthesis gas. The comparison of these various concepts suggests that, in the short and medium term, chemical absorption is the most interesting process for NGCC power plants. For CP power plants, oxy-combustion can be a very interesting option, as well as post-combustion capture by chemical solvents. (author)

  16. Life time of nuclear power plants and new types of reactors; La duree de vie des centrales nucleaires et les nouveaux types de reacteurs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-05-01

    This report, realized by the Evaluation Parliamentary Office of scientific and technological choices, aims to answer simple but fundamental questions for the french electric power production. What are the phenomena which may limit the exploitation time of nuclear power plants? How can we fight against the aging, at which cost and with which safety? The first chapter presents the management of the nuclear power plants life time, an essential element of the park optimization but not a sufficient element. The second chapter details the EPR and the other reactors for 2015 as a bond between the today and tomorrow parks. The last chapter deals with the necessity of efforts in the research and development to succeed in 2035 and presents other reactors in project. (A.L.B.)

  17. Are atomic power plants saver than nuclear power plants

    International Nuclear Information System (INIS)

    It is rather impossible to establish nuclear power plants against the resistance of the population. To prevail over this resistance, a clarification of the citizens-initiatives motives which led to it will be necessary. This is to say: It is quite impossible for our population to understand what really heappens in nuclear power plants. They cannot identify themselves with nuclear power plants and thus feel very uncomfortable. As the total population feels the same way it is prepared for solidarity with the citizens-initiatives even if they believe in the necessity of nuclear power plants. Only an information-policy making transparent the social-psychological reasons of the population for being against nuclear power plants could be able to prevail over the resistance. More information about the technical procedures is not sufficient at all. (orig.)

  18. Development of the process of energy transfer from a nuclear Power Plant to an intermediate temperature electrolyse; Desarrollo del proceso de transferencia de energia desde una central nuclear a un electrolizador de temperatura intermedia

    Energy Technology Data Exchange (ETDEWEB)

    Munoz Cervantes, A.; Cuadrado Garcia, P.; Soraino Garcia, J.

    2013-07-01

    Fifty million tons of hydrogen are consumed annually in the world in various industrial processes. Among them, the ammonia production, oil refining and the production of methanol. One of the methods to produce it is the electrolysis of water, oxygen and hydrogen. This process needs electricity and steam which a central nuclear It can be your source; Hence the importance of developing the transfer process energy between the two. The objective of the study is to characterize the process of thermal energy transfer from a nuclear power plant to an electrolyzer of intermediate temperature (ITSE) already defined. The study is limited to the intermediate engineering process, from the central to the cell.

  19. Communication and surrounding of Asco and Vandellos II nuclear power plants; La comunicacion y el entorno de las centrales de Asco y Vandellos II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The Asco and Vandellos-II power plants have always been integrated into the regions where they are located, and they take an active part in the development of surrounding towns through quality employment provided by our facilities, social and cultural support and aid to development promoted by regional councils. Communication to media is a corporate priority defined in our strategic plant, to ensure openness, rigour and punctuality. We also attend to the visitors who want to learn more about our facilities in the visitor center, and we have agreements with agrarian institutions in the area so that students can de practical training in the farms we own for agricultural production. (Author)

  20. The Biogas from bio-energy electrical power plant of Nuevo Leon; Central electrica de biogas de bioenergia de Nuevo Leon

    Energy Technology Data Exchange (ETDEWEB)

    Arvizu F, Jose L [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Saldana M, Jaime L [Sistemas de Energia Internacional S.A. de C.V. (Mexico)

    2005-07-01

    The biogas from bio-energy electrical power plant of Nuevo Leon represents, in all the national territory, the first experience on the advantage of biogas emitted by the sanitary landfills for the generation of electrical energy. Therefore, one of the specific objectives of this paper is the one of diffusion and reproduction of the same one in other cities of Mexico and Latin America. The project is framed within the world-wide policies on the control of emissions for the reduction of the greenhouse effect gases (GEG) and its impact in the global climatic change. The gas emitted by the trash sanitary landfills, commonly known as biogas, is a gas mixture derived from the decomposition of the organic matter of the municipal trash by microorganisms in anaerobic conditions. Biogas generated in the sanitary landfills has a methane content of 55% and a 35% of carbon dioxide. The balance 10% is made up of water steam, hydrogen, nitrogen, oxygen, hydrogen sulfur and other gases in minimum amounts. [Spanish] La Central Electrica de Biogas de Bioenergia de Nuevo Leon representa, en todo el territorio nacional, la primera experiencia sobre el aprovechamiento del biogas emitido por los rellenos sanitarios para la generacion de energia electrica. Por esta razon, uno de los objetivos especificos de este trabajo es la de difusion y reproduccion del mismo en otras ciudades de Mexico y Latinoamerica. El proyecto esta enmarcado dentro de las politicas mundiales sobre el control de emisiones para la reduccion de los gases de efecto invernadero (GEI) y su impacto en el cambio climatico global. El gas emitido por la basura dispuesta en los rellenos sanitarios, comunmente conocido como biogas, es una mezcla de gases derivado de la descompensacion de la materia organica de la basura municipal por microorganismos en condiciones anaerobias. El biogas generado en los rellenos sanitarios tiene un contenido de metano del 55% y un 35% de bioxido de carbono. El 10% restante se compone de vapor

  1. Producing Electricity in Power Plant

    OpenAIRE

    Khabrana, Ahmed; Ageeli, Jaber

    2015-01-01

    Abstract This Bachelor thesis has been written at the Blekinge Institute of Technology. The thesis describes electricity production in Shoaiba Steam Power plant in Saudi Arabia. Shoaiba Power Plant is located 100 km South of Jeddah city in Saudi Arabia. Total power production ability reaches 4400 MW. Shoaiba Power Plant has two stages and is constructed with 11 units, each unit produces 400 MW at line voltage 24 kV and line current 16 kA. Main pieces of equipment and their function in the sta...

  2. Conditions of call for tenders on the offshore wind power plants; Conditions de l'appel d'offres portant sur des centrales eolienne en mer

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    In the framework of the renewable energies sources development, the french government decided to launch a call for tenders for the realization of offshore wind power plants in 2007. The call for tenders conditions concern: the energetic and technical characteristics of the installations as the primary energy, the production technic, the power; the industrial implementing delay; the exploitation and the operating time; the implementing sites; the weighting and the classification principles. The main conditions concerning the utilization of the maritime public land property outside of the harbors. (A.L.B.)

  3. AND THERMAL POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Alduhov Oleg Aleksandrovich

    2012-10-01

    Full Text Available Investigation of the atmospheric dispersion as part of the process of selection of sites to accommodate nuclear and thermal power plants is performed to identify concentration fields of emissions and to assess the anthropogenic impact produced on the landscape components and human beings. Scattering properties of the atmospheric boundary layer are mainly determined by the turbulence intensity and the wind field. In its turn, the turbulence intensity is associated with the thermal stratification of the boundary layer. Therefore, research of the atmospheric dispersion is reduced to the study of temperature and wind patterns of the boundary layer. Statistical processing and analysis of the upper-air data involves the input of the data collected by upper-air stations. Until recently, the upper-air data covering the standard period between 1961 and 1970 were applied for these purposes, although these data cannot assure sufficient reliability of assessments in terms of the properties of the atmospheric dispersion. However, recent scientific and technological developments make it possible to substantially increase the data coverage by adding the upper-air data collected within the period between 1964 and 2010. The article has a brief overview of BL_PROGS, a specialized software package designated for the processing of the above data. The software package analyzes the principal properties of the atmospheric dispersion. The use of the proposed software package requires preliminary development of a database that has the information collected by an upper-air station. The software package is noteworthy for the absence of any substantial limitations imposed onto the amount of the input data that may go up in proportion to the amount of the upper-air data collected by upper-air stations.

  4. Plants and the central nervous system.

    Science.gov (United States)

    Carlini, E A

    2003-06-01

    This review article draws the attention to the many species of plants possessing activity on the central nervous system (CNS). In fact, they cover the whole spectrum of central activity such as psychoanaleptic, psycholeptic and psychodysleptic effects, and several of these plants are currently used in therapeutics to treat human ailments. Among the psychoanaleptic (stimulant) plants, those utilized by human beings to reduce body weight [Ephedra spp. (Ma Huang), Paullinia spp. (guaraná), Catha edulis Forssk. (khat)] and plants used to improve general health conditions (plant adaptogens) were scrutinized. Many species of hallucinogenic (psychodysleptic) plants are used by humans throughout the world to achieve states of mind distortions; among those, a few have been used for therapeutic purposes, such as Cannabis sativa L., Tabernanthe iboga Baill. and the mixture of Psychotria viridis Ruiz and Pav. and Banisteriopsis caapi (Spruce ex Griseb.) C.V. Morton. Plants showing central psycholeptic activities, such as analgesic or anxiolytic actions (Passiflora incarnata L., Valeriana spp. and Piper methysticum G. Forst.), were also analysed.Finally, the use of crude or semipurified extracts of such plants instead of the active substances seemingly responsible for their therapeutic effect is discussed. PMID:12895668

  5. Establishment and evolution of Radiological Environmental Monitoring Programmes in nuclear power plants; Establecimiento y evolucion de los programas de vigilancia radiologica ambiental en las centrales nucleares

    Energy Technology Data Exchange (ETDEWEB)

    Marugan, I.; Luque, S.; Martin, J. L.; Rey, C.; Salas, R.; Sterling, A.; Ramos, L. M.

    2013-09-01

    This article presents a brief overview of how the Radiological Environmental Monitoring Programmes carried out around nuclear power plants have evolved associated to different reasons as the legal framework, operational phases of the facilities, development on the detection and measurement of low levels of radiation due to the state of art and best available technologies, changes within sites as well as in their surroundings and accident taken place inside and outside of our borders. (Author)

  6. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    This Guide applies to nuclear power plants for which the total power supply comprises normal power supply (which is electric) and emergency power supply (which may be electric or a combination of electric and non-electric). In its present form the Guide provides general guidance for all types of emergency power systems (EPS) - electric and non-electric, and specific guidance (see Appendix A) on the design principles and the features of the emergency electric power system (EEPS). Future editions will include a second appendix giving specific guidance on non-electric power systems. Section 3 of this Safety Guide covers information on considerations that should be taken into account relative to the electric grid, the transmission lines, the on-site electrical supply system, and other alternative power sources, in order to provide high overall reliability of the power supply to the EPS. Since the nuclear power plant operator does not usually control off-site facilities, the discussion of methods of improving off-site reliability does not include requirements for facilities not under the operator's control. Sections 4 to 11 of this Guide provide information, recommendations and requirements that would apply to any emergency power system, be it electric or non-electric

  7. The continuous improvement system of nuclear power plant of Laguna Verde; El sistema de mejora continua de la central nucleoelectrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A. [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Km. 42.5 Cardel-Nautla, Veracruz (Mexico)], e-mail: arr99999@cfe.gob.mx

    2009-10-15

    This paper describes the continuous improvement system of nuclear power plant of Laguna Verde and the achievements in implementing the same and additionally two study cases are presents. In February 2009 is noteworthy because the World Association of Nuclear Operators we identified as a learning organization, qualification which shows that the continuous improvement system has matured, and this system will expose as I get to learn to capitalize on our own experiences and external experiences diffused by the nuclear industry. In 2007 the management of nuclear power plants integrates its improvement systems and calls it continuous improvement system and is presented in the same extensive report that won the National Quality Award. This system is made up of 5 subsystems operating individually and are also related 1) human performance; 2) referential comparison or benchmarking; 3) self-assessment; 4) corrective action and 5) external operating experience. Five subsystems that plan, generate, capture, manage, communicate and protect the knowledge generated during the processes execution of nuclear power plant of Laguna Verde, as well as from external sources. The target set in 2007 was to increase the intellectual capital to always give response to meeting the security requirements, but creating a higher value to quality, customer, environment protection and society. In brief each of them, highlighting the objective, expectations management, implementation and some benefits. At the end they will describe two study cases selected to illustrate these cases as the organization learns by their continuous improvement system. (Author)

  8. Evaluation of solar thermal power plants using economic and performance simulations

    Science.gov (United States)

    El-Gabawali, N.

    1980-01-01

    An energy cost analysis is presented for central receiver power plants with thermal storage and point focusing power plants with electrical storage. The present approach is based on optimizing the size of the plant to give the minimum energy cost (in mills/kWe hr) of an annual plant energy production. The optimization is done by considering the trade-off between the collector field size and the storage capacity for a given engine size. The energy cost is determined by the plant cost and performance. The performance is estimated by simulating the behavior of the plant under typical weather conditions. Plant capital and operational costs are estimated based on the size and performance of different components. This methodology is translated into computer programs for automatic and consistent evaluation.

  9. Discussion of mechanical design for pressured cavity-air-receiver in solar power tower system

    Energy Technology Data Exchange (ETDEWEB)

    Fan, Zhilin; Zhang, Yaoming; Liu, Deyou; Wang, Jun; Liu, Wei [Hohai Univ., Nanjing (China). New Materials and Energy Sources Research and Exploitation Inst.

    2008-07-01

    In 2005, Hohai university and Nanjing Chunhui science and technology Ltd. of China, cooperating with Weizmann Institute of Science and EDIG Ltd. of Israel, built up a 70kWe solar power tower test plant in Nanjing, Jiangsu province, China, which was regarded as the first demonstration project to demonstrate the feasibility of solar power tower system in China. The system consists of heliostats field providing concentrated sunlight, a solar tower with a height of 33 meter, a pressured cavity-air-receiver transforming solar energy to thermal energy, a modified gas turbine adapting to solar power system, natural gas subsystem for solar-hybrid generation, cooling water subsystem for receiver and CPC, controlling subsystem for whole plant, et al. In this system, air acts as actuating medium and the system works in Brayton cycle. Testing results show that solar power tower system is feasible in China. To promote the development of solar powered gas turbine system and the pressured cavity-air-receiver technology in China, it is necessary to study the mechanical design for pressured Cavity-air-receiver. Mechanical design of pressured cavity-air-receiver is underway and some tentative principles for pressured cavity-air-receiver design, involving in power matching, thermal efficiency, material choosing, and equipment security and machining ability, are presented. At the same time, simplified method and process adapted to engineering application for the mechanical design of pressured cavity-air-receiver are discussed too. Furthermore, some design parameters and appearance of a test sample of pressured cavity-air-receiver designed in this way is shown. It is appealed that, in China, the research in this field should be intensified and independent knowledge patents for pivotal technological equipments such as receiver in solar power tower system should be formed. (orig.)

  10. Incremento de la Eficiencia en Centrales Termoeléctricas por Aprovechamiento de los Gases de la Combustión Increasing Thermal Efficiency at Thermoelectric Power Plants Through Combustion Exhaust Gases Management

    Directory of Open Access Journals (Sweden)

    Jesús M Blanco

    2011-01-01

    Full Text Available Se presenta una propuesta para aprovechar el calor latente del vapor condensado en un economizador usado para precalentar el agua de alimentación al generador de vapor, con el fin de mejorar la eficiencia de las centrales termoeléctricas. Se expone una metodología novedosa aplicada a centrales de más de 350 MW de potencia y que queman gas natural. Se presenta también un detallado estudio de las distintas alternativas propuestas, evaluandofinalmente el efecto directo sobre su viabilidad económica. Se han llegado a obtener incrementos de más del 0.6 % en la eficiencia energética global, además de cortos períodos de retorno simple de la inversión dependiendodel número de horas anuales efectivas de funcionamiento de la central.This paper presents a proposal for using the latent heat of the steam condensed in an economizer used to preheat the feeding water to the steam generator, with the aim of increasing the efficiency of thermal power plants. A novel methodology applied to power plants producing over 350 MW power plants and that use natural gas is developed. Also, a detailed study of the different alternatives proposed is presented and their direct effects on the economic feasibility have been evaluated. Increases up to 0.6 % in the global efficiency are obtained, besides short return investment periods, depending on the annual effective working hours of the power plant.

  11. High temperature helical tubular receiver for concentrating solar power system

    Science.gov (United States)

    Hossain, Nazmul

    In the field of conventional cleaner power generation technology, concentrating solar power systems have introduced remarkable opportunity. In a solar power tower, solar energy concentrated by the heliostats at a single point produces very high temperature. Falling solid particles or heat transfer fluid passing through that high temperature region absorbs heat to generate electricity. Increasing the residence time will result in more heat gain and increase efficiency. A novel design of solar receiver for both fluid and solid particle is approached in this paper which can increase residence time resulting in higher temperature gain in one cycle compared to conventional receivers. The helical tubular solar receiver placed at the focused sunlight region meets the higher outlet temperature and efficiency. A vertical tubular receiver is modeled and analyzed for single phase flow with molten salt as heat transfer fluid and alloy625 as heat transfer material. The result is compared to a journal paper of similar numerical and experimental setup for validating our modeling. New types of helical tubular solar receivers are modeled and analyzed with heat transfer fluid turbulent flow in single phase, and granular particle and air plug flow in multiphase to observe the temperature rise in one cyclic operation. The Discrete Ordinate radiation model is used for numerical analysis with simulation software Ansys Fluent 15.0. The Eulerian granular multiphase model is used for multiphase flow. Applying the same modeling parameters and boundary conditions, the results of vertical and helical receivers are compared. With a helical receiver, higher temperature gain of heat transfer fluid is achieved in one cycle for both single phase and multiphase flow compared to the vertical receiver. Performance is also observed by varying dimension of helical receiver.

  12. Wake-up receiver based ultra-low-power WBAN

    CERN Document Server

    Lont, Maarten; Roermund, Arthur van

    2014-01-01

    This book presents the cross-layer design and optimization of wake-up receivers for wireless body area networks (WBAN), with an emphasis on low-power circuit design. This includes the analysis of medium access control (MAC) protocols, mixer-first receiver design, and implications of receiver impairments on wideband frequency-shift-keying (FSK) receivers. Readers will learn how the overall power consumption is reduced by exploiting the characteristics of body area networks. Theoretical models presented are validated with two different receiver implementations, in 90nm and 40nm CMOS technology.   • Provides an overview of wireless body area network design from the network layer to the circuit implementation, and an overview of the cross-layer design trade-offs; • Discusses design at both the network or MAC-layer and circuit-level, with an emphasis on circuit design; • Covers the design of low-power frequency shift keying (FSK) wake-up-receivers; • Validates theory presented with two different recei...

  13. Sensible heat receiver for solar dynamic space power system

    Science.gov (United States)

    Perez-Davis, Marla E.; Gaier, James R.; Petrefski, Chris

    1991-01-01

    A sensible heat receiver is considered which uses a vapor grown carbon fiber-carbon (VGCF/C) composite as the thermal storage medium and which was designed for a 7-kW Brayton engine. This heat receiver stores the required energy to power the system during eclipse in the VGCF/C composite. The heat receiver thermal analysis was conducted through the Systems Improved Numerical Differencing Analyzer and Fluid Integrator (SINDA) software package. The sensible heat receiver compares well with other latent and advanced sensible heat receivers analyzed in other studies, while avoiding the problems associated with latent heat storage salts and liquid metal heat pipes. The concept also satisfies the design requirements for a 7-kW Brayton engine system. The weight and size of the system can be optimized by changes in geometry and technology advances for this new material.

  14. Electrodynamic wireless power transmission to a torsional receiver

    International Nuclear Information System (INIS)

    This paper presents a wireless power transmission (WPT) concept that uses electrodynamic coupling and torsional motion of a permanent magnet in the receiver. The system is shown to transfer an average power of 3.09 mW (power density equal to 143 μW/cm3) over a distance of 1 cm, an average power of 1.98 mW over a distance of 2 cm, and an average power of 126 μW over a distance of 7 cm. We also demonstrate unaltered power transmission through conductive media, including a human hand and an aluminum plate, highlighting a key advantage of the electrodynamic wireless power transmission approach

  15. Next Generation Geothermal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Brugman, John; Hattar, Mai; Nichols, Kenneth; Esaki, Yuri

    1995-09-01

    A number of current and prospective power plant concepts were investigated to evaluate their potential to serve as the basis of the next generation geothermal power plant (NGGPP). The NGGPP has been envisaged as a power plant that would be more cost competitive (than current geothermal power plants) with fossil fuel power plants, would efficiently use resources and mitigate the risk of reservoir under-performance, and minimize or eliminate emission of pollutants and consumption of surface and ground water. Power plant concepts were analyzed using resource characteristics at ten different geothermal sites located in the western United States. Concepts were developed into viable power plant processes, capital costs were estimated and levelized busbar costs determined. Thus, the study results should be considered as useful indicators of the commercial viability of the various power plants concepts that were investigated. Broadly, the different power plant concepts that were analyzed in this study fall into the following categories: commercial binary and flash plants, advanced binary plants, advanced flash plants, flash/binary hybrid plants, and fossil/geothed hybrid plants. Commercial binary plants were evaluated using commercial isobutane as a working fluid; both air-cooling and water-cooling were considered. Advanced binary concepts included cycles using synchronous turbine-generators, cycles with metastable expansion, and cycles utilizing mixtures as working fluids. Dual flash steam plants were used as the model for the commercial flash cycle. The following advanced flash concepts were examined: dual flash with rotary separator turbine, dual flash with steam reheater, dual flash with hot water turbine, and subatmospheric flash. Both dual flash and binary cycles were combined with other cycles to develop a number of hybrid cycles: dual flash binary bottoming cycle, dual flash backpressure turbine binary cycle, dual flash gas turbine cycle, and binary gas turbine

  16. Nuclear power plant common aging terminology

    International Nuclear Information System (INIS)

    This report defines and encourages the use of a set of common terms and definitions that characterize aging and aging management of nuclear power plant systems, structures, and components. Common aging terminology encompasses the areas of degradation causes, degradation/aging, life, failure, and maintenance. The terminology should prove useful in plant license renewal, life-cycle management, maintenance, and equipment qualification. The principal intended benefits are improved reporting and interpretation of plant experience data (especially failure data) and improved interpretation and compliance with codes, standards, and regulations related to aging of nuclear power plants. The terminology was developed using a sound, systematic technical and lexicographical approach, as well as input from a committee with members from electric utilities, the Nuclear Management and Resources Council (NUMARC), the Electric Power Research Institute (EPRI), the United States Nuclear Regulatory Commission (NRC), and national research laboratories. Draft definitions received an extensive industry review. Formal comments were received from 19 organizations worldwide. The report presents the results of this effort and contains definitions, figures, examples of usage, dictionary definitions, and discussions describing the relationships among the 85 terms and 27 synonyms of the common aging terminology. The terms and definitions are generally consistent with similar terminology used by the Institute of Nuclear Power Operations (INPO). The common aging terminology has been reviewed by NUMARC and the NRC and is recommended for use throughout the nuclear power industry

  17. The Mecca Biomass Power Plant

    International Nuclear Information System (INIS)

    Colmac Energy, Inc. is constructing a 47 MW biomass-fired, electrical power generating plant in Mecca, California. Commercial operation is scheduled for April, 1992. Electrical power will be sold to Southern California Edison Company. The plant is unusual in its fuel choice and utilization. The fuel includes both wood chips and a variety of waste agricultural materials. These are processed and blended to provide a stable fuel product for the boiler. a recirculating fluidized bed boiler is used. The use of agricultural waste for fuel provides several benefits. Local truckers benefit by an added need for services. The plant itself, of course, provides employment opportunities and locally-generated electrical power

  18. Marine nuclear power plant simulator

    International Nuclear Information System (INIS)

    In this paper, a real time simulator of nuclear power plant for ship propulsion is described. The simulator is composed of a hybrid computer and an operating console. Simulated power plant is a 36 MWt PWR plant. Reactor kinetics, fuel temperature, primary coolant temperature, primary pressure, temperature and pressure of steam in the steam generator, steam flow, rotating speed of the propeller shaft, and various controlling system are simulated. Using this simulator, frequency response functions of the reactor power to the variation of reactivity and load were measured. (author)

  19. Owners of nuclear power plants

    International Nuclear Information System (INIS)

    The following list indicates percentage ownership of commercial nuclear power plants by utility companies as of December 1, 1979. The list includes all plants licensed to operate, under construction, docketed for NRC safety and envionmental reviews, or under NRC antitrust review. It does not include those plants announced but not yet under review or those plants formally cancelled. In many cases, ownership may be in the process of changing as a result of antitrust license conditions and hearings, altered financial conditions, changed power needs, and other reasons. However, this list reflects only those ownership percentages of which the NRC has been formally notified

  20. Owners of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, C.R.; White, V.S.

    1996-11-01

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

  1. Owners of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Reid, R.L.

    2000-01-12

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of November 1999. The report is divided into sections representing different aspects of nuclear plant ownership.

  2. Monte-Carlo RAY tracing simulation of a falling particle receiver in connection with a central receiver field

    Energy Technology Data Exchange (ETDEWEB)

    Alxneit, I. [Paul Scherrer Inst. (PSI), Villigen (Switzerland)

    1999-08-01

    The program RAY was developed to perform Monte-Carlo simulations of the flux distribution in solar reactors in connection with an arbitrary heliostat field. The code accounts for the shading of the incoming rays from the sun due to the reactor supporting tower as well as for full blocking and shading of the heliostats among themselves. A simplified falling particle reactor (FPR) was evaluated. A central receiver field was used with a total area of 311 m{sup 2} composed of 176 round, focusing heliostats. No attempt was undertaken to optimise either the geometry of the heliostat field nor the aiming strategy of the heliostats. The FPR was evaluated at two different geographic latitudes (-8.23W/47.542N; PSI and -8.23W/20.0N) and during the course of a day (May 30{sup th}). The incident power passing through the reactor aperture and the flux density distribution within the FPR was calculated. (author) 3 figs., 1 tab., 3 refs.

  3. Radiological Impact Study of the Coal-Fired Power Plant of Anllares; Estudio del Impacto Radiologico de la Central Termica de Carbon de Anllares

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Baeza, A.; Mora, J. C.; Corbacho, J. A.; Trueba, C.; Guillen, J.; Rodriguez, J.; Miralles, Y.

    2014-04-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of {sup 2}38U, {sup 2}35U, {sup 2}32Th and also the 40K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the noncombustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the Anllares coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  4. Radiological Impact Study of the Coal-Fired Power Plant of La Robla; Estudio del Impacto Radiologico de la Central Termica de Carbon de La Robla

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Baeza, A.; Mora, J. C.; Corbacho, J. A.; Trueba, C.; Guillen, J.; Rodriguez, J.; Miralles, Y.

    2014-04-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of {sup 2}38U, {sup 2}35U, {sup 2}32Th and also the 40K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the noncombustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the La Robla coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  5. Radiological Impact Study of the Coal-Fired Power Plant of Lada; Estudio del Impacto Radiologico de la Central Termica de Carbon de Lada

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Baeza, A.; Mora, J. C.; Corbacho, J. A.; Trueba, C.; Guillen, J.; Rodriguez, J.; Miralles, Y.

    2014-02-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of 238{sup U}, 235{sup U}, 232{sup T}h and also the 40K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the noncombustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the Lada coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  6. Radiological Impact Study of the Coal-Fired Power Plant of La Robla; Estudio del Impacto Radiologico de la Central Termica de Carbon de La Robla

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Mora, J. C.; Trueba, C.; Rodriguez, J.; Baeza, A.; Corbacho, J. A.; Guillen, J.; Miralles, Y.

    2013-07-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of 238{sup U}, 235{sup U}, 232{sup T}h and also the 40{sup K}, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the non-combustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the La Robla coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  7. Radiological Impact Study of the Coal-Fired Power Plant of Abono; Estudio del Impacto Radiologico de la Central Termica de Carbon de Abono

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Baeza, A.; Mora, J. C.; Corbacho, J. A.; Trueba, C.; Guillen, J.; Rodriguez, J.; Miralles, Y.

    2014-04-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of {sup 2}38U, {sup 2}35U, {sup 2}32Th and also the {sup 4}0K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the noncombustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the Abono coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  8. Radiological Impact Study of the Coal-Fired Power Plant of Meirama; Estudio del Impacto Radiologico de la Central Termica de Carbon de Meirama

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Baeza, A.; Mora, J. C.; Corbacho, J. A.; Trueba, C.; Guillen, J.; Rodriguez, J.; Miralles, Y.

    2014-04-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of {sup 2}38U, {sup 2}35U, {sup 2}32Th and also the 40K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the noncombustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the Meirama coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  9. Radiological Impact Study of the Coal-Fired Power Plant of Velilla; Estudio del Impacto Radiologico de la Central Termica de Carbon de Velilla

    Energy Technology Data Exchange (ETDEWEB)

    Robles, B.; Mora, J. c.; Trueba, C.; Rodriguez, J.; Baeza, A.; Corbacho, J. a.; Guillen, J.; Miralles, Y.

    2013-10-01

    Coal, fuel used in thermal power plants for electricity production, contains variable concentrations of naturally occurring radionuclides from natural disintegration series of 238U, 235U, 232Th and also the 40K, which are enhanced in the wastes and coproducts due to the industrial process. For this reason, natural radionuclides which are part of the non-combustible fraction of coal, except those volatiles which incorporate directly to the flue gases, concentrates and are partitioned between fly ashes and bottom ashes. This enhancement could cause, to the workers of the installation and to members of the public around the plant, an increase in the exposure which should be assessed under the radiation protection point of view. Present report collect the results obtained from a screening assessment of the radiological impact derived from the normal operation of the Velilla coal-fired power plant. The project where this assessment was performed is part of a bigger project which is jointly developed by the Unit of Radiation Protection of the Public and the Environment (UPRPYMA) of CIEMAT and the Environmental Radioactivity Laboratory of the Extremadura University (LARUEX) in agreement with the Spanish Association of the Electrical Industry (ENUSA). (Author)

  10. An Energy-Efficient MIMO Algorithm with Receive Power Constraint

    CERN Document Server

    Glazunov, Andrés Alayón

    2012-01-01

    We consider the energy-efficiency of Multiple-Input Multiple-Output (MIMO) systems with constrained received power rather than constrained transmit power. A Energy-Efficient Water-Filling (EEWF) algorithm that maximizes the ratio of the transmission rate to the total transmit power has been derived. The EEWF power allocation policy establishes a trade-off between the transmission rate and the total transmit power under the total receive power constraint. The static and the uncorrelated fast fading Rayleigh channels have been considered, where the maximization is performed on the instantaneous realization of the channel assuming perfect information at both the transmitter and the receiver with equal number of antennas. We show, based on Monte Carlo simulations that the energy-efficiency provided by the EEWF algorithm can be more than an order of magnitude greater than the energy-efficiency corresponding to capacity achieving Water-Filling (WF) algorithm. We also show that the energy-efficiency increases with b...

  11. Space nuclear reactor power plants

    International Nuclear Information System (INIS)

    Requirements for electrical and propulsion power for space are expected to increase dramatically in the 1980s. Nuclear power is probably the only source for some deep space missions and a major competitor for many orbital missions, especially those at geosynchronous orbit. Because of the potential requirements, a technology program on space nuclear power plant components has been initiated by the Department of Energy. The missions that are foreseen, the current power plant concept, the technology program plan, and early key results are described

  12. Occupational exposures of nuclear power plant workers in Finland

    International Nuclear Information System (INIS)

    In Finland, the Radiation and Nuclear Safety Authority (STUK) maintains a central dose register where all occupational doses of radiation workers are recorded. The computerised register enables easy control of personal doses, including annual, 5 year and lifetime doses. The type of radiation work is also recorded in the dose register. Finland was one of the first countries in the world to introduce dose limits based on the recommendations of ICRP 60. In this article, the radiation dose data of the Finnish nuclear power plant workers are analysed. The majority of the radiation doses are received during the maintenance outages. The trend of the 5 year doses and their distribution are presented. Doses received during different work assignments were averaged over the years 1996-1999 and they are also discussed in this article. (author)

  13. Power Consumption Models for Decimation FIR Filters in Multistandard Receivers

    Directory of Open Access Journals (Sweden)

    Khaled Grati

    2012-01-01

    Full Text Available Decimation filters are widely used in communication-embedded systems. In fact, decimation filters are useful for implementing channel filtering or selection with low-computation complexity requirements. Many multistandard receiver designs that are required in ubiquitous embedded systems are based on a cascade of decimation filter processing. Filter number and implementation architectures have a significant impact on system performances, such as computation complexity, area, throughput, and power consumption. In this work, we present filter power consumption estimation models for FIR filters. Power consumption models were obtained from a large number of FIR filter syntheses using a direct form. Several curves that estimate power consumption were extracted from these synthesis results. Then, we have evaluated the impact of polyphase decomposition on power consumption of FIR filter and compared it with the direct form results. Some tips regarding power consumption were deduced for the polyphase implementation form. The aim of this work is to help a system designer to select an efficient implementation for FIR in terms of power consumption without having to implement and synthesize the different possible solutions. The proposed method is applied for STMicroelectronics libraries 90 nm and 65 nm low power then validated with a use case of multistandard receiver designing.

  14. Fuel cycle management by the electric enterprises and spanish nuclear Power plants; Gestion del ciclo de combustible por las empresas electricas y centrales nucleares espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Celma, E. M.; Gonzalez, C.; Lopez, J. V.; Melara, J.; Lopez, L.; Martinez, J. C.; Culbras, F.; Blanco, J.; Francia, L.

    2015-07-01

    The Nuclear Fuel Group reports to the Technology Committee of the UNESA Nuclear Energy Committee, and is constituted by representatives of both the Spanish Utilities and the Nuclear Power Plants. The Group addresses the nuclear plant common issues in relation to the operation and management of the nuclear fuel in their different stages of the Fuel Cycle. The article reviews the activities developed by the Group in the Front-End, mainly in the monitoring of international programs that define criteria to improve the Fuel Reliability and in the establishment of common bases for the implementation of changes in the regulation applying the nuclear fuel. Concerning the Back-End the Group focuses on those activities of coordination with third parties related to the management of used fuel. (Author)

  15. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  16. Nuclear Power Plant Simulation Game.

    Science.gov (United States)

    Weiss, Fran

    1979-01-01

    Presents a nuclear power plant simulation game which is designed to involve a class of 30 junior or senior high school students. Scientific, ecological, and social issues covered in the game are also presented. (HM)

  17. A heat receiver design for solar dynamic space power systems

    Science.gov (United States)

    Baker, Karl W.; Dustin, Miles O.; Crane, Roger

    1990-01-01

    An advanced heat pipe receiver designed for a solar dynamic space power system is described. The power system consists of a solar concentrator, solar heat receiver, Stirling heat engine, linear alternator and waste heat radiator. The solar concentrator focuses the sun's energy into a heat receiver. The engine and alternator convert a portion of this energy to electric power and the remaining heat is rejected by a waste heat radiator. Primary liquid metal heat pipes transport heat energy to the Stirling engine. Thermal energy storage allows this power system to operate during the shade portion of an orbit. Lithium fluoride/calcium fluoride eutectic is the thermal energy storage material. Thermal energy storage canisters are attached to the midsection of each heat pipe. The primary heat pipes pass through a secondary vapor cavity heat pipe near the engine and receiver interface. The secondary vapor cavity heat pipe serves three important functions. First, it smooths out hot spots in the solar cavity and provides even distribution of heat to the engine. Second, the event of a heat pipe failure, the secondary heat pipe cavity can efficiently transfer heat from other operating primary heat pipes to the engine heat exchanger of the defunct heat pipe. Third, the secondary heat pipe vapor cavity reduces temperature drops caused by heat flow into the engine. This unique design provides a high level of reliability and performance.

  18. What they have in common the engineering from the Spanish nuclear power plants?; Que tienen en comun las ingenierias de las centrales nucleares espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Mendez, M.

    2012-11-01

    In recent years, Spain Nuclear Power Plant Engineering have switched their project/task management method to Critical Chain multi-project management, developed by Dr. Goldratt, achieving outstanding results in improving quality and productivity. Multitasking reduction, task and resource synchronizing without the need of exact schedules, implementing a real-time priority information system, relying on the software Concerto, and daily decision making are the basis for the management change that has generated productivity increases of between 20% to 50%, opening new horizons for improvement in other scenarios such as optimizing refueling shutdowns. (Author)

  19. Study and modelling of underground water pollution in the region of large central heating-and-power plant in Eastern Czechia

    International Nuclear Information System (INIS)

    Regularities of underground water formation in one of hydrogeological regions in Eastern Czechia are considered. Analysis of long-term observation of ground water quality shows that it changed sufficiently in this region under the effect of permanent effluents of combustion products of heating-and-power plant and products of chemical reclamation of soils into atmosphere. The type of ground water changed from hydrocarbonate to sulfate. Results of model evaluation of pollution of surface air by sulfur dioxides correlate satisfactorily with data on real content of sulfates in ground water. 5 refs., 12 figs., 4 tabs

  20. Elecnuc. Nuclear power plants worldwide

    International Nuclear Information System (INIS)

    This small folder presents a digest of some useful information concerning the nuclear power plants worldwide and the situation of nuclear industry at the end of 1997: power production of nuclear origin, distribution of reactor types, number of installed units, evolution and prediction of reactor orders, connections to the grid and decommissioning, worldwide development of nuclear power, evolution of power production of nuclear origin, the installed power per reactor type, market shares and exports of the main nuclear engineering companies, power plants constructions and orders situation, evolution of reactors performances during the last 10 years, know-how and development of nuclear safety, the remarkable facts of 1997, the future of nuclear power and the energy policy trends. (J.S.)

  1. Robotics for nuclear power plants

    International Nuclear Information System (INIS)

    Demand for robots in nuclear power plants is increasing of late in order to reduce workers' exposure to radiations. Especially, owing to the progress of microelectronics and robotics, earnest desire is growing for the advent of intellecturized robots that perform indeterminate and complicated security work. Herein represented are the robots recently developed for nuclear power plants and the review of the present status of robotics. (author)

  2. Nuclear power plant

    International Nuclear Information System (INIS)

    The present invention provides reduction of volumes of buildings and the area of the buildings having a plurality of plants. Namely, a plurality of reactor building areas corresponding to a plurality of plants are disposed in a reactor building. In each of the reactor building areas, apparatuses including reactors of the plants are disposed. In addition, a plurality of reactor wells, spent fuel pools, pools for temporary storing facilities are arranged on an identical line. With such a constitution, since various kinds of facilities in the reactor buildings can be used in common, the volume of buildings and areas for the buildings in the plants as a whole can be reduced. In addition, turbine buildings can be used in common by the same idea. As a result, the number of buildings, the volume of the buildings and the area of the buildings of the plants can be reduced as a whole thereby enabling to reduce the steps, costs and materials required for building construction. (I.S.)

  3. Concentrating solar power: tube receiver's R and D

    International Nuclear Information System (INIS)

    The ENEA's technology on parabolic trough depends on the optical efficiency of the collector and on the tube receiver's capacity to absorb the energy concentrated by the parabolic mirrors. Innovative solutions are being developed at ENEA's Casaccia and Portici Centres, in collaboration with Italian companies, with the aim of encouraging industrial production of high-efficiency receiver tubes that can operate at temperature as high as 580 centigrades degrees. This article presents the results of the R and D phase of the project and some of the data obtained during the experimental activity conducted at the Casaccia Centre's Solar Collectors Test Plant

  4. Operate a Nuclear Power Plant.

    Science.gov (United States)

    Frimpter, Bonnie J.; And Others

    1983-01-01

    Describes classroom use of a computer program originally published in Creative Computing magazine. "The Nuclear Power Plant" (runs on Apple II with 48K memory) simulates the operating of a nuclear generating station, requiring students to make decisions as they assume the task of managing the plant. (JN)

  5. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    This Safety Guide provides detailed guidance on the provisions of the Code on the Safety in Nuclear Power Plants: Operation, IAEA Safety Series No. 50-C-O(Rev.1) on the maintenance of structures, systems and components. Like the Code, the Guide forms part of the IAEA's programme, referred to as the NUSS programme, for establishing Codes and Safety Guides relating to nuclear power plants. Effective maintenance is essential for safe operation of a nuclear power plant. It not only ensures that the level of reliability and effectiveness of all plant structures, systems and components having a bearing on safety remains in accordance with design assumptions and intent, but also that the safety status of the plant is not adversely affected after commencement of operation. Nuclear power plant maintenance requires special attention because of: Limitations set by requirements that a minimum number of components remain operable even when the plant is shut down in order to ensure that all necessary safety functions are guaranteed; Difficulty of access to some plant items even when the plant is shut down, due to radiation protection constraints; Potential radiological hazards to site personnel and the public. This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, selecting and training maintenance personnel, providing maintenance facilities and equipment, procuring stores and spare parts, reviewing, controlling and carrying out plant modifications, and generating, collecting and retaining maintenance records for establishing and

  6. The design of solar tower power plants

    Science.gov (United States)

    Gretz, J.

    The conversion of solar energy into electricity in solar thermal tower power plants is examined. Mirrors attached to mobile, sun-following heliostats concentrate solar rays into the opening of a receiver mounted on a tower. In the receiver, the radiant energy is absorbed by a system of pipes filled with a flowing material which is heated and drives a turbogenerator directly or via a heat exchanger. It is shown that the optics involved in this concept preclude the optimization of the pipe material, since the local distribution of rays in the heater of tower power plants varies diurnally and annually. This requires each pipe section to be designed for maximum stress, even though that stress occurs only at brief intervals during the day.

  7. Human factors in atomic power plant

    International Nuclear Information System (INIS)

    To ensure safety should have priority over all other things in atomic power plants. In Chernobyl accident, however, various human factors including the systems for bulb check after inspection and communication, troubles in the interface between hardwares such as warning speakers and instruments, and their operators, those in education and training for operators and those in the general management of the plant have been pointed out. Therefore, the principles and the practical measures from the aspect of human factors in atomic power plants were discussed here. The word, ''human factor'' was given a definition in terms of the direct cause and the intellectual system. An explanatory model for human factors, model SHEL constructed by The Tokyo Electric Power Co., Ltd., Inc. was presented; the four letter mean software(S), hardware(H), environment(E) and liveware(L). In the plants of the company, systemic measures for human error factors are taken now in all steps not only for design, operation and repairing but also the step for safety culture. Further, the level required for the safety against atomic power is higher in the company than those in other fields. Thus, the central principle in atomic power plants is changing from the previous views that technology is paid greater importance to a view regarding human as most importance. (M.N.)

  8. Wind power plant system services

    DEFF Research Database (Denmark)

    Basit, Abdul; Altin, Müfit

    modern power system with large scale integration wind power. This study presents the investigation of the real-time balance control in a modern Danish power system, where WPPs can actively contribute to active power balance control. New solutions for the automatic generation control (AGC) dealing with...... WPPs are developed and analysed. The main results of this research work show that the WPPs can actively contribute to power balance control through primary and secondary response. The integration of WPPs control into the AGC is of high relevance, particularly in situations when wind power is...... beat risk unless the wind power plants (WPPs) are able to support and participate in power balancing services. The objective of this PhD project is to develop and analyse control strategies which can increase the WPPs capability to provide system services, such as active power balancing control, in a...

  9. Economic analysis of extended cycles in the Laguna Verde nuclear power plant; Analisis economico de ciclos de extendidos en la Central Nucleoelectrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez N, H.; Hernandez M, J.L.; Francois L, J.L. [Facultad de Ingenieria, UNAM, 04510 Mexico D.F. (Mexico)]. E-mail: hermilo@correo.unam.mx

    2004-07-01

    The present work presents a preliminary analysis of economic type of extended cycles of operation of the Unit One in the Laguna Verde nuclear power plant. It is analysed an equilibrium cycle of 18 months firstly, with base to the Plan of Use of Energy of the Federal Commission of Electricity, being evaluated the cost of the energy until the end of the useful life of the plant. Later on an alternative recharge scenario is presented with base to an equilibrium cycle of 24 months, implemented to the beginning of the cycle 11, without considering transition cycles. It is added in both cycles the cost of the substitution energy, considering the unitary cost of the fuel of a dual thermoelectric power station of 350 M We and evaluating in each operation cycle, in both scenarios, the value of the substitution energy. The results show that a reduction of the days of recharge in the cycle of 24 months could make this option but favorable economically. The duration of the period of recharge rebounds in considerable grade in the cost of energy generation for concept of fuel. (Author)

  10. Non-conventional Power Plants in Aviation

    OpenAIRE

    Voronovs, V; Šestakovs, V

    2014-01-01

    Power plants on the basis of heat engines except for reciprocating internal combustion engines and jet propulsion engines are classified by the authors of the paper as non- conventional ones. The article also presents the results of research carried out in this field by scientists of the Institute of Aeronautics of Riga Technical University. The article describes the two patents. The first patent to be considered was received for a rotary-piston engine, the second one – for the Stirling engin...

  11. Emergency power systems at nuclear power plants

    International Nuclear Information System (INIS)

    This Safety Guide was prepared as part of the Nuclear Safety Standards programme for establishing Codes and Safety Guides relating to nuclear power plants (NPPs). The first edition of the present Safety Guide was developed in the early 1980s. The text has now been brought up-to-date, refined in several details and amended to include non-electrical diverse and independent power sources. This Guide applies to NPP for which the total power supply comprises a normal power supply and an emergency power supply (EPS), which may be electrical or a combination of electrical and non-electrical. The Guide provides general guidance for all types of EPS and specific guidance on the design safety requirements and the features of the electrical and non-electrical portions of the EPS. 9 figs, 2 tabs

  12. Energy sources and power plants

    International Nuclear Information System (INIS)

    Energy is obtained from various energy sources (coal, petroleum, natural gas, nuclear fuels, wind energy, solar energy, hydro power, biomass, geothermal energy). These differ in each case with respect to their availability, methods of their production and the required power plant technologies. As technologies of the future fuel cells and nuclear fusion are traded.

  13. Thermoelectric power plant conversion from fuel oil to coal with integration of a CO{sub 2} capture plant. Part 1; Conversion de una central termoelectrica de combustoleo a carbon con integracion de una planta de captura de CO{sub 2}. Parte 1

    Energy Technology Data Exchange (ETDEWEB)

    Huante Perez, Liborio; Rodriguez Martinez, J. Hugo; Arriola Medellin, Alejandro M. [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2010-11-15

    The major features in the design of power plant conversion from fuel oil to coal, considering the new technical characteristics of fuel and his transportation to plant, equipment required to comply with Mexican environmental standards and additional requirements of auxiliaries are described. In addition, changes needed on power plant design were considered according to integrates CO{sub 2} capture plant alternatives. [Spanish] En este articulo se describen las caracteristicas principales en el diseno de la conversion de Centrales de combustoleo a carbon, considerando el nuevo combustible y su transporte hasta la central, los equipos requeridos para cumplir con las normas ambientales y los requerimientos adicionales de los servicios auxiliares. Adicionalmente, se lleva a cabo el analisis de los cambios requeridos en el diseno de la conversion considerando diferentes opciones para la integracion de una planta de captura de CO{sub 2}, la cual debera entregar este subproducto para su compresion y envio a su destino final para su almacenamiento.

  14. Actinides inventory of the nuclear power plant of Laguna Verde Unit 1; Inventario de actinidos de la Central Nuclear Laguna Verde Unidad 1

    Energy Technology Data Exchange (ETDEWEB)

    Martinez C, E.; Ramirez S, J. R. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Alonso V, G., E-mail: eduardo.martinez@inin.gob.mx [IPN, Escuela Superior de Fisica y Matematicas, Av. Instituto Politecnico Nacional s/n, U. P. Adolfo Lopez Mateos, Col. San Pedro Zacatenco, 07738 Mexico D. F. (Mexico)

    2013-10-15

    At the present time 435 nuclear power reactors exist for the electricity generation operating in the world and 63 in construction. Mexico has two reactors type BWR in the nuclear power plant of Laguna Verde. The nuclear fuel that is used in the nuclear reactors is retired of the reactor core when the energy that this contained has been extracted. This used fuel is known as spent nuclear fuel, the problem with this fuel is that was irradiated inside the reactor and continuous emitting a high radiation, as well as a significant heat quantity when being extracted, for what is necessary to maintain it in cooling and with some shielding to be protected of the radiation that emits. This objective is achieved confining the fuel in the spent nuclear fuel pool, where it is cooled and the same pool provides the necessary shielding to maintain the surroundings in safety radiation levels for the personnel that work in the power plant. An inconvenience of the pools is its limited storage capacity and that after certain time is necessary to remove the fuel, according to the established regulation to continue operating. To correct this inconvenience, two alternatives of spent fuel disposition exist, 1) the final disposition in deep geologic repositories and 2) the reprocessing and recycled of spent fuel. Each alternative presents its particularities and specific problems; however taking many years to be able to implement anyone of them. To carry out the second option, is indispensable to estimate the total mass of actinides generated in the spent nuclear fuel, that which represents to develop a methodology for it, this action is the main purpose of the present work. Inside our calculation method was necessary to appeal to diverse computation tools as the codes Origin-S and Keno V.a. Later on the obtained were compared with a problem type Benchmark, being obtained a smaller absolute error to 1.0%. (Author)

  15. TVA's nuclear power plant experience

    International Nuclear Information System (INIS)

    This paper reviews TVA's nuclear power plant design and construction experience in terms of schedule and capital costs. The completed plant in commercial operation at Browns Ferry and six additional plants currently under construction represent the nation's largest single commitment to nuclear power and an ultimate investment of $12 billion by 1986. The presentation is made in three separate phases. Phase one will recapitulate the status of the nuclear power industry in 1966 and set forth the assumptions used for estimating capital costs and projecting project schedules for the first TVA units. Phase two describes what happened to the program in the hectic early 1979's in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecedented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next ten-year period

  16. Assessing incentive policies for integrating centralized solar power generation in the Brazilian electric power system

    International Nuclear Information System (INIS)

    This study assesses the impacts of promoting, through auctions, centralized solar power generation (concentrated solar power – CSP, and photovoltaic solar panels – PV) on the Brazilian power system. Four types of CSP plants with parabolic troughs were simulated at two sites, Bom Jesus da Lapa and Campo Grande, and PV plants were simulated at two other sites, Recife and Rio de Janeiro. The main parameters obtained for each plant were expanded to other suitable sites in the country (totaling 17.2 GW in 2040), as inputs in an optimization model for evaluating the impacts of the introduction of centralized solar power on the expansion of the electricity grid up to 2040. This scenario would be about USD$ 185 billion more expensive than a business as usual scenario, where expansion solely relies on least-cost options. Hence, for the country to incentivize the expansion of centralized solar power, specific auctions for solar energy should be adopted, as well as complementary policies to promote investments in R and D and the use of hybrid systems based on solar and fuels in CSP plants. - Highlights: • We assess the impacts of promoting centralized CSP and PV by auctions in Brazil. • We simulate energy scenarios with and without solar power. • Our solar scenario leads to 17 GW of solar capacity installed between 2020 and 2040. • This solar scenario is some USD$ 185 billion more expensive than the base case

  17. Nuclear power plant

    International Nuclear Information System (INIS)

    A modular design for an internal heat exchanger for a power reactor with separate primary and secondary cooling circuits, eg. a PWR, is described. The purpose of the design is to reduce the thermal stresses in the feed water system by a special arrangement of this. (JIW)

  18. Baseline for coal powered plants

    International Nuclear Information System (INIS)

    Frequently, the cost performance of a specific power plant is measured by comparing the cost with the statistical average cost of plants through the industry. Unless all of the variables have been considered, this comparison may draw a misleading conclusion. The capital cost of a power plant varies with time (year of commercial operation and construction duration) due to the effect of inflation. Examine these cost data in detail revels that the variation in the cost is very wide. For example, published data shows that the ratio between the highest to the lowest cost per KW is more than 4 to 1 for the plants that commenced operation in 1984. The wide variation of the capital costs is explained below in relation to various influencing factors, differing conditions, and scope of work. This paper provides a defined baseline coal-fired plant, an analysis of its capital costs, and a discussion of the reasons for such wide variation

  19. Distributed generation and centralized power system in Thailand

    DEFF Research Database (Denmark)

    Sukkumnoed, Decharut

    The paper examines and discusses conflicts between the development of distributed power and centralized power system in Thailand.......The paper examines and discusses conflicts between the development of distributed power and centralized power system in Thailand....

  20. Advanced sensible heat solar receiver for space power

    Science.gov (United States)

    Bennett, Timothy J.; Lacy, Dovie E.

    1988-01-01

    NASA Lewis, through in-house efforts, has begun a study to generate a conceptual design of a sensible heat solar receiver and to determine the feasibility of such a system for space power applications. The sensible heat solar receiver generated in this study uses pure lithium as the thermal storage medium and was designed for a 7 kWe Brayton (PCS) operating at 1100 K. The receiver consists of two stages interconnected via temperature sensing variable conductance sodium heat pipes. The lithium is contained within a niobium vessel and the outer shell of the receiver is constructed of third generation rigid, fibrous ceramic insulation material. Reradiation losses are controlled with niobium and aluminum shields. By nature of design, the sensible heat receiver generated in this study is comparable in both size and mass to a latent heat system of similar thermal capacitance. The heat receiver design and thermal analysis were conducted through the combined use of PATRAN, SINDA, TRASYS, and NASTRAN software packages.

  1. Low-profile heliostat design for solar central receiver systems

    Science.gov (United States)

    Fourakis, E.; Severson, A. M.

    1977-01-01

    Heliostat designs intended to reduce costs and the effect of adverse wind loads on the devices were developed. Included was the low-profile heliostat consisting of a stiff frame with sectional focusing reflectors coupled together to turn as a unit. The entire frame is arranged to turn angularly about a center point. The ability of the heliostat to rotate about both the vertical and horizontal axes permits a central computer control system to continuously aim the sun's reflection onto a selected target. An engineering model of the basic device was built and is being tested. Control and mirror parameters, such as roughness and need for fine aiming, are being studied. The fabrication of these prototypes is in process. The model was also designed to test mirror focusing techniques, heliostat geometry, mechanical functioning, and tracking control. The model can be easily relocated to test mirror imaging on a tower from various directions. In addition to steering and aiming studies, the tests include the effects of temperature changes, wind gusting and weathering. The results of economic studies on this heliostat are also presented.

  2. Providing emergency supply of nuclear power plants

    OpenAIRE

    ROZMILER, Jiří

    2013-01-01

    Work "Providing emergency power nuclear power plant" describes how solving their own consumption nuclear power plant, as emergency power supply is designed and how it should be a solution of known states of emergency, having an immediate impact on the power consumption of their own nuclear power plants. The aim of this thesis is to propose options to strengthen its own emergency power consumption of nuclear power plants, one might say-more resistant to harsh extremes, which could lead to loss...

  3. Development of database for spent fuel and special waste from the Spanish nuclear power plants; Desarrollo de la base de datos para el combustible gastado y residuos especiales de las centrales nucleares espanolas

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez Gandal, R.; Rodriguez Gomez, M. A.; Serrano, G.; Lopez Alvarez, G.

    2013-07-01

    GNF Engineering is developing together with ENRESA and with the UNESA participation, the spent fuel and high activity radioactive waste data base of Spanish nuclear power plants. In the article is detailed how this strategic project essential to carry out the CTS (centralized temporary storage) future management and other project which could be emerged is being dealing with, This data base will serve as mechanics of relationship between ENRESA and Spanish NPPS, covering the expected necessary information to deal with mentioned future management of spent fuel and high activity radioactive waste. (Author)

  4. Submarine nuclear power plant

    International Nuclear Information System (INIS)

    Purpose: To provide a ballast tank, and nuclear power facilities within the containment shell of a pressure resistance structure and a maintenance operator's entrance and a transmission cable cut-off device at the outer part of the containment shell, whereby after the construction, the shell is towed, and installed by self-submerging, and it can be refloated for repairs by its own strength. Constitution: Within a containment shell having a ballast tank and a pressure resisting structure, there are provided nuclear power facilities including a nuclear power generating chamber, a maintenance operator's living room and the like. Furthermore, a maintenance operator's entrance and exit device and a transmission cable cut-off device are provided within the shell, whereby when it is towed to a predetermined a area after the construction, it submerges by its own strength and when any repair inspection is necessary, it can float up by its own strength, and can be towed to a repair dock or the like. (Yoshihara, H.)

  5. Chemistry in power plants 2011

    International Nuclear Information System (INIS)

    Within the VGB Powertech conference from 25th to 27th October, 2011, in Munich (Federal Republic of Germany), the following lectures and poster contributions were presented: (1) The revised VGB standard for water-steam-cycle Chemistry; (2) Switchover from neutral operation to oxygen treatment at the power station Stuttgart-Muenster of EnBW Kraftwerke AG; (3) Steam contamination with degradation products of organic matters present in the feedwater of the Lanxess-Rubber cogeneration plant; (4) Laboratory scale on-line noble metal deposition experiments simulating BWR plant conditions; (5) Building a new demin installation for the power plant EPZ in Borssele; (6) Replacement of the cooling tower installations in the nuclear power plant Goesgen-Daenien AG; (7) Aging of IEX resins in demin plants - Cost optimisation by adaptation of regenerants; (8) The largest DOW trademark EDI System at a combined cycled plant in Europe; (9) Upgrading river Main water to boiler feed water - Experiences with ultrafiltration; (10) Experiences with treatment of the water-steam-cycle in the RDF power plant Nehlsen Stavenhagen with film-forming amines; (11) Comparative modelling of the bubbles thermal collapse and cavitations for estimation of bubbles collapse influence; (12) Overcoming the steam quality - issues from an HRSG for the production of process steam; (13) Legionella - new requirements for power plant operation; (14) How the right chemistry in the FGD helps to improve the removal in the waste water treatment plant; (15) High efficiency filtration in dry/semi-dry FGD plants; (16) Expanding the variety of renewable fuels in the biomass power plant Timelkam using the chemical input control; (17) Corrosion, operating experiences and process improvements to increase the availability and operating time of the biomass power plant Timelkam; (18) The influence of temperature on the measurement of the conductivity of highly diluted solutions; (19) A multiparameter instrumentation approach

  6. VISIT - Virtual visits to nuclear power plants

    International Nuclear Information System (INIS)

    For more than twenty years, EDFs Communication Division has conducted a policy of opening its generation sites to the general public. Around 300,000 people visit a nuclear power plant every year. However, for the security of persons and the safety of facilities, those parts of the plant situated in controlled areas are not accessible to visitors. For the sake of transparency, EDF has taken an interest in the technologies offered by virtual reality to show the general public what a nuclear power plant is really like, so as to initiate dialogue on nuclear energy, particularly with young people. Visit has been developed with virtual reality technologies. It serves to show the invisible (voyage to the core of fission), the inaccessible and to immerse the visitors in environments which are usually closed to the general public (discovery of the controlled area of a nuclear power plant). Visit is used in Public Information Centres which receive visitors to EDF power plants and during international exhibitions and conferences. Visit allows a virtual tour of the following controlled areas: locker room hot area/cold area, a necessary passage before entering the controlled areas; reactor building; fuel building; waste auxiliary building (liquid, solid and gaseous effluents). It also includes a tour of the rooms or equipment usually accessible to the general public: control room, turbine hall, transformer, air cooling tower

  7. Nuclear power plant

    International Nuclear Information System (INIS)

    The plant of the present invention can suppress the amount of clad in feedwater when drains of a moisture content separation heater or a high pressure feedwater heater are recovered. That is, the moisture content separation heater has ferrite or austenite type stainless steel heat transfer pipes. A chromium-enriched layer is formed on the surface of the heat transfer pipe by chromizing treatment or flame spraying. Then, a stainless steel heat transfer pipe having chromium-enriched layer is incorporated to at least one of the moisture content separation heater or the high pressure feedwater heater. During plant operation, the temperature of heated steams is as high as 235 to 282degC. Accordingly, this is a severe corrosion region for ferrite or austenite stainless steel. However, the chromium-enriched layer of excellent corrosion resistance is formed on the surface of the heat transfer pipe. Accordingly, metal ingredients are less leached. As a result, even if the drains are recovered to feedwater, increase of concentration of the clads in the feedwater can be prevented. (I.S.)

  8. Thermal Power Plant Performance Analysis

    CERN Document Server

    2012-01-01

    The analysis of the reliability and availability of power plants is frequently based on simple indexes that do not take into account the criticality of some failures used for availability analysis. This criticality should be evaluated based on concepts of reliability which consider the effect of a component failure on the performance of the entire plant. System reliability analysis tools provide a root-cause analysis leading to the improvement of the plant maintenance plan.   Taking in view that the power plant performance can be evaluated not only based on  thermodynamic related indexes, such as heat-rate, Thermal Power Plant Performance Analysis focuses on the presentation of reliability-based tools used to define performance of complex systems and introduces the basic concepts of reliability, maintainability and risk analysis aiming at their application as tools for power plant performance improvement, including: ·         selection of critical equipment and components, ·         defini...

  9. Financing solar thermal power plants

    International Nuclear Information System (INIS)

    The commercialization of concentrating solar power technology took a major step forward in the mid 1980s and early 1990s with the development of the SEGS plants in California. Over the years they have proven that parabolic trough power technologies are the most cost-effective approach for commercial scale solar power generation in the sunbelt countries of the world. However, the question must be asked why no additional solar power plants have been built following the bankruptcy of the developer of the SEGS projects, LUZ International Limited. Although many believe the SEGS projects were a success as a result of parabolic trough technology they employ, in truth, the SEGS projects were developed simply because they represented an attractive opportunity for investors. Simply states, no additional projects have been developed because no one has been able to put together a similarly attractive financial package to potential investors. More than $1.2 billion in private capital was raised in debt and equity financing for the nine SEGS plants. Investors and bankers who make these investments are the real clients for solar power technologies. They are not interested in annual solar to electric efficiencies, but in risk, return on investments, and coverage ratios. This paper will take a look at solar power projects form the financier's perspective. The challenge in moving forward is to attract private investors, commercial lenders, and international development agencies and to find innovative solutions to the difficult issues that investment in the global power market poses for solar power technologies

  10. Financing Solar Thermal Power Plants

    International Nuclear Information System (INIS)

    The commercialization of concentrating solar power technology took a major step forward in the mid 1980s and early 1990s with the development of the SEGS plants in California. Over the years they have proven that parabolic trough power technologies are the most cost-effective approach for commercial scale solar power generation in the sunbelt countries of the world. However, the question must be asked why no additional solar power plants have been build following the bankruptcy of the developer of the SEGS projects, LUZ International Limited. Although many believe the SEGS projects were a success as a result of parabolic trough technology they employ, in truth, the SEGS projects were developed simply because they represented an attractive opportunity for investors. Simply stated, no additional projects have been developed because no one has been able to put together a similarly attractive financial package to potential investors. More than $1.2 billion in private capital was raised in debt and equity financing for the nine SEGS plants. Investors and bankers who make these investments are the real clients for solar power technologies. They are not interested in annual solar to electric efficiencies, but in risk, return on investments, and coverage ratios. This paper will take a look at solar power projects from the financier's perspective. The challenge in moving forward is to attract private investors, commercial lenders, and international development agencies and to find innovative solutions to the difficult issues that investment in the global power market poses for solar power technologies

  11. Pressurised fluidised bed power plants

    Energy Technology Data Exchange (ETDEWEB)

    Jansson, S.A.; Anderson, L. [ABB Carbon AB, Finspong (Sweden)

    1997-12-31

    The combined experience from almost 75,000 hours of operation on widely different coals in Pressurised Fluidised bed Combined-cycle (PFBC) plants in Sweden, Spain, the US and Japan have demonstrated the viability of ABB`s PFBC technology and the general simplicity of the concept, as well as plant control principles and serviceability. This technology is now commercially offered world-wide and PFBC is being recognized as a competitive solution for power and for combined heat and power applications. The combined-cycle feature makes PFBC highly efficient for power generation. When compared with conventional power plants, and for the same steam conditions, a PFBC plant typically produces at least 10% more electricity from the same amount of coal. There is potential for future additional efficiency increases. The coals used so far in the existing PFBC power plants include bituminous coals with a wide range of sulphur and ash contents, and a sub-bituminous Spanish `black lignite` with extremely high and variable levels of sulphur, ash, and moisture. Brown coal from the eastern parts of Germany will be used as the fuel in a newly ordered PFBC plant in Cottbus, Germany. Oil shale, petcoke, anthracite, and different types of biomass mixed with coal are presently being considered for other PFBC projects under discussion. PFBC is suitable for greenfield plants, but a market also exists for PFBC repowering of older steam plants. Repowering provides an opportunity to convert older, low capacity factor units into assets that lower the system`s production costs as well as improving environmental performance. Ash utilisation also holds promise, elevating the ash from a disposable waste to a valuable resource. 6 refs., 3 figs., 1 tab.

  12. Modular plants with high power gas engines (1 to 30 MWe); Centrales modulaires a moteurs gaz de forte puissance (de 1 a 30 MWe)

    Energy Technology Data Exchange (ETDEWEB)

    Haushalter, J. [Wartsila (France)

    1997-12-31

    This paper is a series of transparencies about the high power gas engines manufactured by Waertsilae NSD Corporation company. The first par recalls the NO{sub x} and CO air pollution regulations worldwide, the German TA-Luft standards and the French 2910 by-law according to the engine type (2 and 4 stroke, dual-fuel, natural gas, LPG, others..) and to the type of pollutants (NO{sub x}, dusts, SO{sub 2}, CO, noise..). The second part presents the Waertsilae NSD Corporation concept of gas-fueled spark ignition engines (Otto cycle, emissions, performances, technology, fuel system, combustion optimization, fuel-air ratio regulation, pollution control equipment) and of the `pure energy` global concept of plants. (J.S.)

  13. Nuclear power plant

    International Nuclear Information System (INIS)

    Purpose: To prevent liquid wastes from being discharged out of the system by processing to recover them in the nuclear reactor and reusing them. Constitution: Discharge of liquid wastes to the surrounding atmosphere are completely eliminated by collecting floor drains, a part of processing water for the regeneration of liquid wastes, non-radioactive steam drains and laundry drains conventionally discharged so far out of the system, processing them in a concentrator, a desalter or the like into water of a high purity and extremely low radioactive concentration, storing the water in an exclusive storage tank and supplying it as a steam or supplementing water to each portion in the plant that requires water of such high purity and extremely low radioactivity. (Yoshihara, H.)

  14. Thermal power plants and environment

    International Nuclear Information System (INIS)

    Recent versions of the air quality models which are reviewed and approved from the Environmental Protection Agency (EPA) are analysed in favour of their application in simple and complex terrain, different meteorological conditions and modifications in the sources of pollutant emissions. Improvement of the standard methods for analysis of the risks affecting the environment from different energy sources has been carried out. The application of the newly introduced model enabled (lead to performing) risk analysis of the coal power plants compared to other types of energy sources. Detailed investigation of the risk assessment and perception from coal power plants, has been performed and applied to the Macedonian coal power plants. Introducing the concept of 'psychological pollution', a modification of the standard models and programs for risk assessment from various energy sources has been suggested (proposed). The model has been applied to REK Bitola, where statistically relevant differences in relation to the control groups have been obtained. (Original)

  15. Operator training simulator for nuclear power plant

    International Nuclear Information System (INIS)

    In nuclear power plants, training of the operators is important. In Japan, presently there are two training centers, one is BWR operation training center at Okuma-cho, Fukushima Prefecture, and another the nuclear power generation training center in Tsuruga City, Fukui Prefecture, where the operators of PWR nuclear power plants are trained. This report describes the BWR operation training center briefly. Operation of a nuclear power plant is divided into three stages of start-up, steady state operation, and shut down. Start-up is divided into the cold-state start-up after the shut down for prolonged period due to periodical inspection or others and the hot-state start-up from stand-by condition after the shut down for a short time. In the cold-state start-up, the correction of reactivity change and the heating-up control to avoid excessive thermal stress to the primary system components are important. The BWR operation training center offers the next three courses, namely beginner's course, retraining course and specific training course. The training period is 12 weeks and the number of trainees is eight/course in the beginner's course. The simulator was manufactured by modeling No. 3 plant of Fukushima First Nuclear Power Station, Tokyo Electric Power Co. The simulator is composed of the mimic central control panel and the digital computer. The software system comprises the monitor to supervise the whole program execution, the logic model simulating the plant interlock system and the dynamic model simulating the plant physical phenomena. (Wakatsuki, Y.)

  16. Ocean power plants

    Energy Technology Data Exchange (ETDEWEB)

    Dembicki, E.

    1982-01-01

    In the fall of 1980 on the shores of the Hawaiian Islands, a floating laboratory of the United States was successfully introduced for testing a heat exchanger and pipes for collecting cold water of the OTES with power of 1 MW. The first American OTES N=10-40 MW should start operation in 1985. By the year 2000, ..sigma..N of the U.S. OTES should reach 10 GW. The Japanese OTES N=10-25 MW should start up in 1989. The experimental OTES N=100 KW has been in operation since October 1981 on the Nauru Island. An OTES of 2 MW is under construction. The concern Empain-Schneider is involved in planning the OTES of closed cycle in France, and the concern CGE is planning the OTES of open cycle.

  17. Temperature Effect to Solar Power Plant

    OpenAIRE

    Modestas Pikutis

    2015-01-01

    There are a lot of different efficiency photovoltaic cells, which are used in solar power plants. All of these different photovoltaic cells are affected by different environment conditions. Maximum power point tracking is the main way to increase solar power plant efficiency. Mostly systems of maximum power point tracking are slow or inaccurate, that means the system cannot stay in maximum power point in solar power plant. This is the main reason why mostly of solar power plants are working n...

  18. Nuclear power plant

    International Nuclear Information System (INIS)

    In a condensate cleanup system and a reactor water cleanup system of a BWR-type reactor, in which primary coolants flow, there is disposed a filtering and desalting device using hollow thread membrane filter and ion exchange resin for a condensate cleanup system, and using a high temperature filter made of a metal, a metal oxide or ceramics as a filtering material and a precoat filter made of a powdery ion exchange resin as a filtering material for a reactor water cleanup system. This can completely remove cruds generated in the condensate system. Since the reactor water cleanup system comprises the powdery resin precoat-type filtering and desalting device and the high temperature filter using ceramics, ionic impurities such as radioactive materials can be removed. Accordingly, cruds are not carried into the inside of the reactor, and since the radioactive concentration in the reactor water is reduced, radiation exposure upon periodical inspection can be minimized almost to zero, to attain a clean plant. (T.M.)

  19. Packing solutions for power plants

    International Nuclear Information System (INIS)

    Asbestos packings are being replaced in more and more countries with alternative products. This paper discusses modern packing solutions for valves and pumps in power plants. Die-moulded packing rings made of expanded graphite foil are described m detail, with recommendations for correct installation. Application examples for spring-loaded valves and cover lid seals are given. As an alternative for repair and service use, a braided expanded graphite packing reinforced with Inconel wire is described. Proposals for sealing various pump applications in power plants are also made. (Author)

  20. Indoor Thermal Comfort Analysis of Centralized Control Room in Thermal Power Plant%火力发电厂集中控制室室内热舒适性研究

    Institute of Scientific and Technical Information of China (English)

    倪明龙; 张英俊; 刘明涛; 盛帮明; 黄艺

    2014-01-01

    There are some deficiencies about staff comfort on air conditioning design of the centralized control room in China thermal power plants .Combined thermal comfort with the actual situation in power plant ,the influence of indoor temperature ,in-door humidity and wind speed of working area on the thermal comfort of centralized control room has been studied by the PMV -PPD evaluation indicators .Found that the electric power industry standard DL/T 5035-2004 provisions on the centralized control room indoor winter and summer air conditioning system design parameters failed to fully consider the indoor thermal comfort .Rea-sonable suggestions were given and provided the reference for the design personnel .%目前我国火力发电厂集中控制室空调设计在人员舒适性方面考虑不足。从热舒适角度出发,结合电厂实际情况,采用PMV-PPD评价指标探讨温度、湿度及工作区风速3个因素对集控室内热舒适性的影响。发现现行电力行业标准DL/T 5035-2004中关于集控室室内冬、夏季空调系统设计参数的规定未能充分考虑室内人员的热舒适性,并给出合理建议,为设计人员提供参考。

  1. Loviisa nuclear power plant analyzer

    International Nuclear Information System (INIS)

    The APROS Simulation Environment has been developed since 1986 by Imatran Voima Oy (IVO) and the Technical Research Centre of Finland (VTT). It provides tools, solution algorithms and process components for use in different simulation systems for design, analysis and training purposes. One of its main nuclear applications is the Loviisa Nuclear Power Plant Analyzer (LPA). The Loviisa Plant Analyzer includes all the important plant components both in the primary and in the secondary circuits. In addition, all the main control systems, the protection system and the high voltage electrical systems are included. (orig.)

  2. Actions for the environmental adequateness and emissions control at the Martin del Corral power plant-Termozipa; Obras de adecuacion ambiental y control de emisiones para la central termoelectrica Martin del Corral - Termozipa

    Energy Technology Data Exchange (ETDEWEB)

    Arevalo Osorio, Luis [Empresa de Energia de Bogota, Bogota (Colombia)

    1996-12-31

    In this paper the general data on the Martin del Corral-Termozipa, of Colombia, fossil fueled power plant are exposed. The results of a study to determine the environmental impact originated in the influence zone of this Power Plant are presented, particularly on the Bogota River. The study was framed into the environmental policy driven by the Colombian sector. Different solutions addressed to the optimization of the handling, capacity and control of the emissions and counteract the pollution possibilities of the Bogota River are described [Espanol] En esta ponencia se exponen datos generales de la central termoelectrica Martin del Corral - Termozipa-, de Colombia. Se presentan los resultados de un estudio para determinar el impacto ambiental ocasionado en la zona de influencia de esta central, y en particular sobre el rio Bogota. El estudio se enmarco dentro de la politica ambiental impulsada por el sector colombiano. Se describen diversas soluciones encaminadas a optimizar el manejo, capacidad y control de las emisiones y contrarrestar las posibilidades de contaminacion del rio Bogota

  3. The PFBC Power Plant of Escatron; Proyecto de Demostracion de la Combustion en Lecho Fuido a Presion Central Termica de Escatron

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The Escatron Pressurized Fluidized Bed Combustion Demonstration Plant was led by ENDESA which set out on the Project with its own specific objectives, and also have involved contributions from designers and suppliers, as ABB and BWE. The project objectives may be defined as follows: To make progress in the development of clean and efficient technology applicable to a wide range of coal types, specially to the peculiar Spanish black lignites. To be able to design and manufacture a new technology in the contest of European Union, specially developing capacity in Spain. All this give rise to a framework which took shape in the Escatron Project Monitoring Committee. Sulphur retention in PFBC technology has proved to be efficient, with levels higher than 90%. The nitric oxides emissions fall within limits set by present regulations. It is likely that more restrictive regulations in the future, will require the consideration of injecting ammonium technic over free-chamber bed. The most significant problem is that the flue gas from the cyclones to the gas turbine, has a high dust content. The cleaning system for this gas should be improved, and the best option appear to be the introduction of ceramic filters. The new plants could be built at higher power, as should be 300-400 MWe, operating with higher pressure (16 bar). This option together with better steam conditions, gives rise to a better energy yields and competitive electric energy production. But we should not dimis more proved designs of 100-200 MWe, as an interesting modular solution. (Author)

  4. Line focus solar thermal central receiver research study. Final report, April 30, 1977-March 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Di Canio, D.G.; Treytl, W.J.; Jur, F.A.; Watson, C.D.

    1979-04-01

    The results of a study to examine the line focus central receiver alternative for solar thermal generation of electric power on a commercial scale are presented. The baseline concept consists of the following elements: (1) a solar collector (heliostat) whose geometry is the equivalent of a focused parabolic cylinder. The heliostat reflecting surface is composed of an array of flexible rectangular mirror panels supported along their long edges by a framework which rotates about an axis parallel to the ground plane. The mirror panels in one section (18.3 meters by 3.05 meters (60 feet by 10 feet)) are defocused in unison by a simple mechanism under computer control to achieve the required curvature. Two sections (110 meters/sup 2/(591 feet/sup 2/)) are controlled and driven in elevation by one control/drive unit. (2) A linear cavity receiver, composed of 61-meter (200-foot) sections supported by towers at an elevation of 61 meters (200 feet). Each section receives feedwater and produces turbine-rated steam. The cavity is an open cylinder 1.83 meters (6 feet) in inside diameter, with a 1.22 meter (4 foot) aperture oriented at 45 degrees to the collector field. (3) Heliostat control, consisting of a local controller at each heliostat module which communicates with a master control computer to perform elevation tracking and focal length adjustment. The control logic is open-loop, with sun position computer by the master computer with an algorithm. Image sensors, mounted above and below the receiver aperture, are used to monitor the collector field and provide feedback to the master computer for detection of misaligned heliostats. (WHK)

  5. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    During the first quarter of 1990 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. Nuclear electricity accounted for 32.5% of the total Finnish electricity production during this quarter. The load factor average of the nuclear power plant units was 99.0%. An international nuclear event scale has been introduced for the classification of nuclear power plant events according to their nuclear and radiation safety significance. The scale first undergoes about a year long trial period in several countries. on the scale, events are divided into levels from 1 to 7 of which events at Level 7 are the most serious. Furthermore, Level 0 (Below Scale) is used for events with no safety significance. All events which occurred at the Finnish nuclear power plants this quarter are classified as Level 0. Occupational radiation doses and external releases of radioactivity were considerably below authorised limits. At the Loviisa plant, a back-up emergency feedwater system independent of the plant's other systems has been introduced which offers a new, alternative means of removing residual heat from the reactor. Owing to this system, the risk of a severe accident has been further reduced. At the TVO plants, systems have been introduced by which accident sequences which lead to containment failure could be eliminated and the consequences of a potential severe accident could be mitigated. In this report, also the release of short-lived radioactive materials along the transfer route of an irradiated sample is described which occured at the FiR 1 research reactor. The amounts of radioactive materials individuals received in their bodies in connection with this event were very low

  6. Noise from wind power plants

    International Nuclear Information System (INIS)

    First, the generation of noise at wind power plants and the character of the sound is described. The propagation of the sound and its dependence on the structure of the ground and on wind and temperature is treated next. Models for calculation of the noise emission are reviewed and examples of applications are given. Different means for reducing the disturbances are described

  7. Fire protection in power plants

    International Nuclear Information System (INIS)

    Graphex-CK 23 is a unique sodium fire extinction product. Minimum amounts of powder are required for very fast action. The sodium can be put to use again, when the fire has been extinguished. It can be applied in other industrial branches and with other metals, e.g. sodium/potassium circuits or lithium coolant in power plants.

  8. Docommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    The German utilities operating nuclear power plants have long concerned themselves with aspects of decommissioning and for this purpose an engineering company was given a contract to study the entire spectrum of decommissioning. The results of this study have been available in autumn 1980 and it is possible to discuss all the aspects of decommissioning on a new basis. Following these results no change in the design concept of LWR nuclear power plants in operation or under construction is necessary because the techniques, necessary for decommissioning, are fully available today. The technical feasibility of decommissioning for power plants of Biblis A and KRB type has been shown in detail. The calculations of the quantity of waste produced during removal of a nuclear power plant could be confirmed and it could be determined with high procedure. The radiation dose to the decommissioning personnel is in the range of the radiation protection regulations and is in the same range as the radiation dose to the personnel within a yearly inservice inspection. (AF)

  9. World nuclear power plant capacity

    International Nuclear Information System (INIS)

    This report provides the background information for statistics and analysis developed by NUKEM in its monthly Market Report on the Nuclear Fuel Cycle. The assessments in this Special Report are based on the continuous review of individual nuclear power plant projects. This Special Report begins with tables summarizing a variety of nuclear power generating capacity statistics for 1990. It continues with a brief review of the year's major events regarding each country's nuclear power program. The standard NUKEM Market Report tables on nuclear plant capacity are given on pages 24 and 25. Owing to space limitations, the first year shown is 1988. Please refer to previous Special Reports for data covering earlier years. Detailed tables for each country list all existing plants as well as those expected by NUKEM to be in commercial operation by the end of 2005. An Appendix containing a list of abbreviations can be found starting on page 56. Only nuclear power plants intended for civilian use are included in this Special Report. Reactor lifetimes are assumed to be 35 years for all light water reactors and 30 years for all other reactor types, unless other data or definite decommissioning dates have been published by the operators. (orig./UA)

  10. Concepts for central solar electric power generation

    Science.gov (United States)

    Kintigh, J. K.

    1974-01-01

    The investigation reported was conducted to select the best conceptual design of a power plant for the dynamic conversion of solar heat to electricity. Conversion of thermal energy to electricity was to be an accomplished with conventional turbomachinery. Questions of site selection are discussed along with solar energy collection systems, aspects of candidate system definition, and reference systems.

  11. Present situation of the control of the transmissions of thermal power plants in Colombia; Situacion actual del control de las emisiones de centrales termoelectricas en Colombia

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Lozada, Hector [Consultor Ambiental, Bogota (Colombia)

    1996-12-31

    This paper presents, departing from a historical recollection, the evolution analysis of the Colombian Electric Sector, with emphasis in the electric component performance. Also, a general view is offered on the characteristics of the thermal electric resource in terms of energy production level, type of fuels used and annual amount of air pollutants originated in the combustion process. In the second part of the paper the normative scheme and the regulation for emissions control, particularly coming from power plants; and the tendencies in the policies that for the management of the atmospheric resource are being implemented in the country are identified. [Espanol] En este articulo se presenta, a partir de un breve recuento historico, el analisis de la evolucion del Sector Electrico Colombiano con enfasis en el comportamiento del componente termoelectrico. Asi mismo se ofrece una vision general sobre las caracteristicas del parque termico, en terminos de los niveles de produccion de energia, los tipos de combustibles utilizados y las cantidades anuales de contaminantes atmosfericos que se generan en el proceso de combustion. En la segunda parte del trabajo se comenta el esquema normativo y la regulacion para el control de las emisiones, en particular de las procedentes de plantas termoelectricas; y se identifican las tendencias de las politicas que para la administracion del recurso atmosferico se estan implantando en el pais.

  12. Financing Solar Thermal Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Price, H. W.; Kistner, R.

    1999-11-01

    The commercialization of concentrating solar power technology took a major step forward in the mid 1980s and early 1990s with the development of the SEGS plants in California. Over the years they have proven that parabolic trough power technologies are the most cost-effective approach for commercial scale solar power generation in the sunbelt countries of the world. However, the question must be asked why no additional solar power plants have been build following the bankruptcy of the developer of the SEGS projects, LUZ International Limited. Although many believe the SEGS projects were a success as a result of parabolic trough technology they employ, in truth, the SEGS projects were developed simply because they represented an attractive opportunity for investors. Simply stated, no additional projects have been developed because no one has been able to put together a similarly attractive financial package to potential investors. More than $1.2 billion in private capital was raised i n debt and equity financing for the nine SEGS plants. Investors and bankers who make these investments are the real clients for solar power technologies. They are not interested in annual solar to electric efficiencies, but in risk, return on investments, and coverage ratios. This paper will take a look at solar power projects from the financier's perspective. The challenge in moving forward is to attract private investors, commercial lenders, and international development agencies and to find innovative solutions to the difficult issues that investment in the global power market poses for solar power technologies.

  13. Nuclear Power Plants in 2001. Experiences and Prospects. Zorita Nuclear Power Plant

    International Nuclear Information System (INIS)

    During 2001, the Jose Cabrera nuclear power plant operated stably and registered no incidents involving an undue risk to the population or environment. Electric power production during the year was 1,126.69 million kilowatt-hours, which represents a load factor of 80.39% of the maximum attainable with the installed power. By order of load factor, this value ranks the plant in an intermediate position among the world's 417 nuclear power plants. The Jose Cabrera nuclear power plant continues to be competitive with the different sources of electric energy production, and it was continuously slated for operation throughout the whole period. July 14 marked the plant's 33 rd year of operation, during which time it has supplied 31,100 million kilowatt-hours to the electric grid. The 25rd refueling outage began on july 28 and lasted for 45 days. The radiological dose received during the outage was 588.18 mSv-p, which is the lowest value ever in the entire history of the Jose Cabrera plant. On April 18, the Consejo de Seguridad Nuclear (CSN) passed a favorable judgment on extension of the Safety Improvement Program. On October 11, an application was submitted to the General Directorate for Energy Policy and Mines requesting an extension of the Operating License, which expires on October 15, 2002, to the year 2008. (Author)

  14. Conception and design of steam power plants

    International Nuclear Information System (INIS)

    The manual presents the fundamentals of thermodynamics and fluid mechanics, the main components of steam power plants, and the power generation process. The following concepts and subjects are discussed at length: steam generator; steam turbines; turbogenerators; condensers; cooling technology; water/steam cycle and water treatment; design data of fossil-fuelled power plants; design and optimisation of nuclear power plant thermodynamics; pipelines and fittings; control systems in steam power plants; connection to the electricity grid and self-supply of thermal power plants; power plant transformer concepts and definitions. (HAG)

  15. Value of solar thermal and photovoltaic power plants to Arizona Public Service Company

    International Nuclear Information System (INIS)

    Arizona Public Service Company has performed a study using historical solar radiation and system load data to (1) estimate the effects of six types of solar generation on system reliability, (2) estimate the central station value of each to its system, (3) and to assess the potential of each of those technologies to provide bulk power to its system in the 2000 time frame. Technologies included three solar thermal (central receiver, dish Stirling, and parabolic trough) and three flat plate photovoltaic plants (fixed position, one axis, and two axis tracking)

  16. Waste receiving and processing plant control system; system design description

    International Nuclear Information System (INIS)

    The Plant Control System (PCS) is a heterogeneous computer system composed of numerous sub-systems. The PCS represents every major computer system that is used to support operation of the Waste Receiving and Processing (WRAP) facility. This document, the System Design Description (PCS SDD), includes several chapters and appendices. Each chapter is devoted to a separate PCS sub-system. Typically, each chapter includes an overview description of the system, a list of associated documents related to operation of that system, and a detailed description of relevant system features. Each appendice provides configuration information for selected PCS sub-systems. The appendices are designed as separate sections to assist in maintaining this document due to frequent changes in system configurations. This document is intended to serve as the primary reference for configuration of PCS computer systems. The use of this document is further described in the WRAP System Configuration Management Plan, WMH-350, Section 4.1

  17. Waste receiving and processing plant control system; system design description

    Energy Technology Data Exchange (ETDEWEB)

    LANE, M.P.

    1999-02-24

    The Plant Control System (PCS) is a heterogeneous computer system composed of numerous sub-systems. The PCS represents every major computer system that is used to support operation of the Waste Receiving and Processing (WRAP) facility. This document, the System Design Description (PCS SDD), includes several chapters and appendices. Each chapter is devoted to a separate PCS sub-system. Typically, each chapter includes an overview description of the system, a list of associated documents related to operation of that system, and a detailed description of relevant system features. Each appendice provides configuration information for selected PCS sub-systems. The appendices are designed as separate sections to assist in maintaining this document due to frequent changes in system configurations. This document is intended to serve as the primary reference for configuration of PCS computer systems. The use of this document is further described in the WRAP System Configuration Management Plan, WMH-350, Section 4.1.

  18. The narrow-gap TIG welding concerns the electric power plants manufacturers; Le soudage en joint etroit suscite l'interet des constructeurs de centrales electriques

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2009-05-15

    Polysoude, France, played host to an expert forum on narrow gap welding from 5-7 November 2008. The successful event welcomed around one hundred experts.The power plant construction sector is currently booming worldwide. For plant construction this means using more pressure-resistant, thick-walled pipes made from high temperature steels. The key quality features of this new steel grade are the values for high creep rupture strength that also apply without restriction as the benchmark for every weld seam on these pipes. In particular, the forum on narrow gap welding addressed this area of automated welding technology. During the forum, Mr Hans-Peter Mariner (Polysoude's CEO), has offered an in-depth insight into the latest developments in narrow gap welding. This presentation highlighted that with wall thicknesses of over 60 mm, welding time is shortened by a factor of five to ten in comparison to conventional TIG processes with a traditional V seam. The welding characteristics of the parent material are the decisive factor in the application of the narrow gap process. Technical advances in equipment technology such as automatic centring, HF-free ignition, seam preparation and optimised gas protection further increase the application limits. The geometry and gap width of the weld groove are based on the mechanical properties of the materials being joined, with the shrinkage characteristics of the seam being particularly important. Another key part of the programme was a presentation on the three different narrow gap-welding techniques. The first involves a single pass weld per layer and torch or work-piece revolution. The second is dual pass welding next to one another, when the seam preparation or positioning exceed the required narrow tolerances of a few tenths of a millimetre for one stringer bead per layer. TIG narrow gap welding with a shuttle-motion electrode is ideal with very large wall thicknesses of 150-200 mm. This is particularly the case if the

  19. Safety for nuclear power plants

    International Nuclear Information System (INIS)

    The September 11, 2001 terrorist attacks on the World Trade Center in New York have reopened the debate in Germany abut the safety of existing nuclear power plants. On the one hand, it culminated in the demand, made from a prominent political position, to disconnect from the grid prematurely five of the older nuclear power plants because they offered no sufficient protection from terrorist attacks carried out by means of commercial airliners. On the other hand, the competent German Federal Ministry of the Interior to this day has not been able to detect a hazardous situation for Germany which would require nuclear power plants (or other facilities) to be shut down - temporarily -so as to reduce their hazard potential. The legal situation is discussed in detail. It is evident that the debate about the safety of any kind of industrial plants will go on and will be revived by any kind of event. Despite the growing need for public safety, it must not be overlooked in the public debate that an absolute exclusion of risk is impossible and that, consequently, there can be no absolute protection of any legal object. (orig.)

  20. Advances in the research line of diagnosing of faults in fossil fuel power plants; Avances en la linea de investigacion de diagnostico de fallas en centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Ruz H, Jose A [Universidad Autonoma del Carmen, Campeche (Mexico); Sanchez C, Edgar N [Centro de Investigacion y Estudios Avanzados del Instituto Politecnico Nacional, Mexico, D.F. (Mexico); Suarez Cerda, Dionisio A; Quintero R, Agustin [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2006-07-01

    This article deals with a research in progress searching to take care of the faults that occur with greatest frequency in the fossil fuel power plants of Mexico with the aid of tools of computational intelligence such as the neuronal networks and the fuzzy logic, for the online recognition of the dynamic behavior patterns of variable groups. What this research looks for is the development of individual systems, in relation to the computational intelligence techniques that continuously supervise the functioning of the unit and inform the operator of the eventual faults in the understanding that on time attention to the faults will result in a minimum cost. The advantages of these diagnosis mechanisms are established in comparison to alternative diagnosis methods, such as their associative memory useful to store fault patterns. [Spanish] Se trata de una investigacion en progreso que busca atender las fallas que ocurren con mayor frecuencia en las unidades termoelectricas de Mexico con la ayuda de herramientas de inteligencia computacional como las redes neuronales y la logica difusa, para el reconocimiento en linea de patrones de comportamiento dinamico de grupos de variables. Lo que esta investigacion busca es desarrollar sendos sistemas, en relacion a las tecnicas de inteligencia computacional, que supervisen continuamente el funcionamiento de la unidad e informen al operador de fallas eventuales, en el entendido que la oportuna atencion a fallas redituara en un costo minimo. Las ventajas de estos mecanismos de diagnostico se establecen en comparacion a metodos de diagnostico alternativos, como su memoria asociativa util para almacenar patrones de falla.

  1. The sanitary officer: first aid coordinator on EDF nuclear power plant; Le delegue sanitaire: coordonnateur des secouristes en centrale nucleaire a E.D.F

    Energy Technology Data Exchange (ETDEWEB)

    Masson, A

    2000-07-01

    The internal organisation for first aid to the injured in case of an accident on E.D.F. nuclear power plant calls for the immediate assistance of a first aid team, consisting of five workers, under the direction of a principal first aid officer; one of the first aid workers, the sanitary officer who instructs the first aid workers intervention awaiting the arrival of an external medical. When the 'Sanitary on-site Emergency Plan' was up' dated, twenty medical doctors and seventy members of staff from five different sites were questioned as to the function of the sanitary officer. The conclusions revealed a notable difference of training amongst the different sites, and concerning first aid organisation, difference of priority of actions, extent of their participation once the medical team arrives and their participation in case of decontamination treatment. The medical doctors and staff lay a particular stress on importance of defining on a national scale the limits of role and responsibilities of the sanitary officer and establish a more specific training in this field, consequently motivating commitment and professionalism involvement. There is a great difference between the training and coaching of the first aid assistance and fire protection teams. To conclude, we propose that the first aid officer be known as first aid coordinator and the qualification of 'Certificat de Formation aux Premiers Secours en Equipe' in compliance with the current legislation together with a specific nuclear module and they should undergo regular on-site drills. (author)

  2. Instrumentation and control of nuclear power plant

    International Nuclear Information System (INIS)

    This report outlines major instruments, man-machine systems in particular, that have been developed recently for nuclear power plants. The TMI accident triggered the reinforcement of man-machine interface systems in many nuclear power plants over the world. In Japan, new types of control panels have been successively adopted for practical applications. These central control panels are characterized by their designs based on basic theories of human engineering, the use of CRT's for efficient plant monitoring, and the effective utilization of computers to permit centralization of data and simplification of operations. Based on the lessons learned from the TMI accidents, various operator supporting systems have been developed in many countries to allow operators to obtain reactor data during their operation work. These systems play an important role especially in case of emergency. Such systems include safety parameter display systems and disturbance analysis systems. Digital instruments have been adopted more widely for the control of major systems including the nuclear reactor as high-performance, high-function microprocessors emerged. Other newly developed systems include highly reliable emergency systems, load following control systems, safety systems equipped with a microprocessor, and training simulators. (Nogami, K.)

  3. Technological tendencies for the development and implementation of fault tolerant active controls in combined cycle power plants; Tendencias tecnologicas para el desarrollo e implantacion de controles activos tolerantes a fallas en centrales de ciclo combinado

    Energy Technology Data Exchange (ETDEWEB)

    Sanchez P, Marino; Verde R, Cristina [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2006-07-01

    This document proposes a methodology that reunites support tools for the operator of a Combined Cycle Generating Power Station allowing him to identify and to classify gas turbine faults, it also reunites some tools for the generation of action advices in the decision making on the operation maneuvers necessary to counteract the effects caused by faults. We are talking about a system implemented in a power station with the reconfiguration of processes and fault arrangement capacities. For this purpose, the line of exhibition delimits first the existing knowledge on automatic control and operations supervision systems in a CCPP and immediately emphasizes the cracks of the system to let pass to the fault tolerant active control system that will detect faults of the gas and steam turbo-generators of a Combined Cycle Generating Power Plant. [Spanish] El presente documento propone una metodologia que reuna herramientas de ayuda al operador de una Central Generadora de Electricidad de Ciclo Combinado para permitirle la identificacion y clasificacion de fallas en las turbinas de gas, asi como herramientas para la generacion de consejos de accion en la toma de decisiones sobre las maniobras de operacion necesarias para contrarrestar los efectos provocados por fallas. Se trata principalmente de un sistema implantado en una central con las capacidades de re-configuracion de procesos y acomodo de fallas. Para esto, la linea de exposicion delimita primero el conocimiento existente sobre sistemas automaticos de control y supervision de operacion en una CGCC y resalta enseguida las grietas del sistema para darle paso al sistema de control activo tolerante a fallas que detectara fallas de los turbogeneradores de gas y vapor de una Central Generadora de Electricidad de Ciclo Combinado.

  4. Solar Power Plants: Dark Horse in the Energy Stable

    Science.gov (United States)

    Caputo, Richard S.

    1977-01-01

    Twelfth in a series of reports on solar energy, this article provides information relating to the following questions: (1) economic cost of solar-thermal-electric central power plants; (2) cost comparison with nuclear or coal plants; (3) locations of this energy source; and (4) its use and social costs. (CS)

  5. Optimization of Maputo Power Plant

    OpenAIRE

    Abacar, Armando

    2013-01-01

    The Electricidade de Moçambique, E.P. (EDM) is the power utility in Mozambique, responsible to generate, transport and distribute electricity all over the country. The company has three gas turbines installed at Maputo Power Plant. All units burn diesel oil and are used only for back up. Currently only the unit #2 is available for operation. The main constraint that EDM faces is the high operation costs due to diesel price. Hence the company is considering converting units #2 and #3 to burn n...

  6. Advances in geodetic surveying of power plants

    Energy Technology Data Exchange (ETDEWEB)

    Zak, M.

    1981-05-01

    Advances have been made in the last few years in geodetic surveying with a view to the following problems: (a) permanent measurement and recording of deformations, and (b) assembly of turbosets by the producer and installation on the power plant foundations. Methods of measurement and recording have been developed in West Germany for the first time. Surveying methods for work as in 'b' have been developed in Poland where, by now, all turbosets produced and assembled in Polish works are installed with the aid of optical methods of measurement. The latter activities receive most attention in the article.

  7. Advances in geodetic surveying of power plants

    International Nuclear Information System (INIS)

    Advances have been made in the last few years in geodetic surveying with a view to the following problems: a) permanent measurement and recording of deformations, b) assembly of turbosets by the producer and installation on the power plant foundations. Methods of measurement and recording have been developed in West Germany for the first time. Surveying methods for work as in 'b' have been developed in Poland where, by now, all turbosets produced and assembled in Polish works are installed with the aid of optical methods of measurement. The latter activities receive most attention in the article. (orig.)

  8. SUBSTANTIAL AND STRUCTURAL COMPONENTS OF THE MENTAL STATUS OF THE PERSONS WHO HAVE RECEIVED SMALL DOSES OF RADIATION DURING LIGUIDATION OF THE ACCIDENT AT THE CHERNOBYL NUCLEAR POWER PLANT

    Directory of Open Access Journals (Sweden)

    О. V. Baranova

    2012-01-01

    Full Text Available In the article the peculiarities of ideas about the catastrophe at the Chernobyl nuclear power plant disaster at the persons who have suffered from radiation during liquidation of the accident’s consequences. View of the accident was considered as a key element of a person’s mind, in particular the adaptive. There were 30 persons, who took part in the research – participants of Chernobyl disaster’s liquidation, veterans of division of an extra risk. The subjective assessment of mental health at persons who survived in Chernobyl disaster was defined; personal properties of victims were revealed; interrelations between personal properties and subjective assessment of mental health were established. It is possible to assume that in process of moving away from the moment of the accident the content of view of Chernobyl disaster shows concentration of the person on experience of mental health and the personal potential.

  9. Nuclear power plants and environment

    International Nuclear Information System (INIS)

    The question of nuclear power plants is analysed in details. The fundamental principles of reactors are described as well as the problems of safety involved with the reactor operation and the quantity and type of radioactive released to the environment. It shows that the amount of radioactive is very long. The reactor accidents has occurred, as three mile island, are also analysed. (M.I.A.)

  10. Training simulators for power plant operation based in multimedia, intelligent tutorials and virtual reality; Simuladores para entrenamiento en la operacion de centrales basados en multimedia, tutores inteligentes y realidad virtual

    Energy Technology Data Exchange (ETDEWEB)

    Rossano Roman, Miguel; Tavira Mondragon, Jose A.; Romero Jimenez, Guillermo; Buenabad Arias, Maria de los Angeles [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    The possibility of utilizing simulators to support the fossil fuel power plants operation personnel training, is analyzed. These simulators can be based in multimedia, intelligent tutorials and virtual reality. The software and hardware advances of these technologies are analyzed and it is concluded that the simulators development for operators training supported in the fore mentioned technologies represents a new alternative for the instruction of personnel of this type of power stations that has to be analyzed and evaluated, since one of the disadvantages of this type of technologies is the equipment and software investment cost [Espanol] Se analiza la posibilidad de utilizar simuladores para ayudar al entrenamiento del personal en la operacion de centrales termoelectricas, dichos simuladores pueden estar basados en multimedia, tutores inteligentes y realidad virtual. Se describen los avances en software y hardware de estas tecnologias y se concluye en que el desarrollo de simuladores para el entrenamiento de operadores apoyados con las tecnologias antes mencionadas representa una nueva alternativa para la instruccion del personal de este tipo de centrales, que hay que analizar y evaluar, ya que una de las desventajas de este tipo de tecnologias es el costo de inversion en equipo y software

  11. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    This 2003 version of Elecnuc contents information, data and charts on the nuclear power plants in the world and general information on the national perspectives concerning the electric power industry. The following topics are presented: 2002 highlights; characteristics of main reactor types and on order; map of the French nuclear power plants; the worldwide status of nuclear power plants on 2002/12/3; units distributed by countries; nuclear power plants connected to the Grid by reactor type groups; nuclear power plants under construction; capacity of the nuclear power plants on the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear plants by country at the end 2002; performance indicator of french PWR units; trends of the generation indicator worldwide from 1960 to 2002; 2002 cumulative Load Factor by owners; nuclear power plants connected to the grid by countries; status of license renewal applications in Usa; nuclear power plants under construction; Shutdown nuclear power plants; exported nuclear power plants by type; exported nuclear power plants by countries; nuclear power plants under construction or order; steam generator replacements; recycling of Plutonium in LWR; projects of MOX fuel use in reactors; electricity needs of Germany, Belgium, Spain, Finland, United Kingdom; electricity indicators of the five countries. (A.L.B.)

  12. Tidal Power Plant Energy Estimation

    Directory of Open Access Journals (Sweden)

    Silva–Casarín R.

    2010-04-01

    Full Text Available In this paper a methodology is presented which allows a quick and simple means of estimating the potential energy that can be obtained from a tidal power plant. The evaluation is made using a normalised nomograph, which is a function of the area of the tidal basin against the electricity installed capacity to thus obtain the potential energy for any location. The results describe two means of operation, one of "flow tide" and the other "flow–ebb tides", with two tidal basin systems operating: single and double reservoir systems. To obtain the normalised nomograph the numerical results for simulations of several tidal power plants under differing operational conditions over a period of one year. These conditions were established by varying the electricity installed capacity, the hydraulic conditions in "flow tide", "ebb tides" or both and with single or double reservoir systems and using sea level information taken every 15 minutes. To validate the model information from the tidal power plant at Rance, France, was used, which includes data concerning production, electricity installed capacity, turbine characteristics and tidal ranges. A very good correlation was found between the results of the numerical model and those reported in various technical reports.

  13. A low-power CMOS frequency synthesizer for GPS receivers

    International Nuclear Information System (INIS)

    A low-power frequency synthesizer for GPS/Galileo L1/E1 band receivers implemented in a 0.18 μm CMOS process is introduced. By adding clock-controlled transistors at latch outputs to reduce the time constant at sensing time, the working frequency of the high-speed source-coupled logic prescaler supplying quadrature local oscillator signals has been increased, compared with traditional prescalers. Measurement results show that this synthesizer achieves an in-band phase noise of -87 dBc/Hz at 15 kHz offset, with spurs less than -65 dBc. The whole synthesizer consumes 6 mA in the case of a 1.8 V supply, and its core area is 0.6 mm2. (semiconductor integrated circuits)

  14. On line chemical analyzers for high purity steam and water, applied to steam power plants; Analizadores quimicos en linea para agua y vapor de alta pureza, aplicados a centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Diaz Perez, Ruth [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1989-12-31

    This article presents a general overview of the advances in the subject of on line analyzers of chemical parameters for high purity water and steam and specifies which ones are commercially available. Also are mentioned besides, the criteria nowadays applied for the selection of the sites for sample grabbing and the analysis that is necessary to perform in each point, depending on the power plant type and the treatment administered (phosphates-Ph coordinated or AVT treatment). [Espanol] El articulo presenta un panorama general de los avances que en materia de analizadores de parametros quimicos en linea para agua y vapor de alta pureza, y especifica cuales estan disponibles en forma comercial. Se citan, ademas los criterios que se aplican actualmente para seleccionar los puntos de toma de muestra y los analisis que es necesario efectuar en cada punto, dependiendo del tipo de central y del tratamiento que se le administre (fosfatos-pH coordinado o tratamiento AVT).

  15. Discussion on Power Market Mode of Central China

    Institute of Scientific and Technical Information of China (English)

    He Zhaocheng; Ye Qing

    2007-01-01

    @@ Central China power system is one of the large regional power grids carrying out power market demonstrative project. Because of lacking power market experience, a lot of problems need to be thoroughly discussed.

  16. Financing nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Much is at stake in developing a financial strategy for decommissioning nuclear power plants. Since decommissioning experience is limited to relatively small reactors, will the costs associated with larger reactors be significantly higher. Certainly the decommissioning issue intersects with other critical issues that will help to determine the future of commercial nuclear power in the US. The author examines briefly the basic concepts and terms related to decommissioning expenses, namely: (1) segregated fund; (2) non-segregated fund; (3) external method; and (4) internal method. He concludes that state regulatory commissions have turned increasingly to the external funding method because of increasing costs and related problems associated with nuclear power, changing conditions and uncertainties concerned with utility restructuring, and recent changes in federal tax laws related to decommissioning. Further, this trend is likely to continue if financial assurance remains a primary concern of regulators to protect this public interest

  17. Nuclear power plant computer replacement

    International Nuclear Information System (INIS)

    Consumers Power Company (CPCo) has recently completed an ambitious project to replace the non-safety-related plant process computer for the Palisades Nuclear Plant. The replacement computer retains the functions of the old plant computer system with minor exceptions. However, the architecture of the new computer system is vastly improved from the old plant computer. The hardware and software components of the new computer system are the state of the art. The old system consisted of five stand-alone computers, each performing their intended function separately. The new architecture employs a number of computing and data acquisition nodes networked together to gather, share, process, present, and store data more efficiently. For cost efficiency, some of the old hardware, such as the Critical Functions Monitoring System multiplexer, has been retained. The new computer system has a significantly higher availability, and lower maintenance cost. It performs certain functions that were not possible with the old system, such as real-time validation of rod position monitored by the Plant Information Processor and the Secondary Position Indicator. While the new computer system is more capable, more reliable, more user friendly, and easier to maintain, taking it to operability status presented CPCo with some new and challenging issues

  18. Robots for nuclear power plants

    International Nuclear Information System (INIS)

    In many industrial applications of robots, the objective is to replace human workers with machines that are more productive, efficient, and accurate. But for nuclear applications, the objective is not so much to replace workers as it is to extend their presence - for example, to project their reach into areas of a nuclear plant where the thermal or radiation environment prohibits or limits a human presence. The economic motivation to use robots for nuclear plant inspection and maintenance is centered on their potential for improving plant availability; a by-product is the potential for reducing the occupational radiation exposure of plant personnel. Robotic equipment in nuclear applications may be divided into two broad categories: single-purpose devices with limited ability to perform different operations, and reprogrammable, multi-purpose robots with some degree of computer-based artificial intelligence. Preliminary assessments of the potential for applying robotics in nuclear power plants - mainly at surveillance and inspection tasks - have been carried out. Future developments are considered

  19. Environmental monitoring around nuclear power plant sites

    International Nuclear Information System (INIS)

    The environmental monitoring around nuclear power plant sites is presented. The basic policy that no part of the ecosystem should be subjected to excessive (above natural) radiation exposure is realized by predictive methodology of environmental and dosimetric models. The validation of these models is achieved through environmental monitoring around nuclear power plant sites right from the pre-operational period through operational phase. The 'potential contaminated media' are monitored in pre-operational phase. The measurements carried out in the environmental matrices for assessment of the impact on the population demonstrate that the objectives of the Department of Atomic Energy are fully realized. These activities are carried out at each nuclear power plant site by establishing an Environmental Survey Laboratory, which operates under the administrative and technical control of the Health Physics Division of BARC. This arrangement ensures independence from the operating organisation and better public acceptance of data generated. The results of environmental monitoring indicate that the radiation dose received by members of the public is well below the regulatory limits. (author)

  20. Fire protection in nuclear power plants

    International Nuclear Information System (INIS)

    The Code on Design (Safety Series 50-C-D (Rev. 1)) within the NUSS (Nuclear Safety Standards) programme of the IAEA points out the necessity of measures for protecting plant items which are important to safety against fires of internal and external origin. Experience of the past two decades in the operation of nuclear power plants and modern analysis techniques confirm that fire may be a real threat to nuclear safety and should receive adequate attention from the beginning of the design process throughout the life of the plant. Within the framework of the NUSS programme, a Safety Guide on fire protection had therefore been developed to enlarge on the general requirements given in the Code. Since its first publication in 1979, there has been considerable development in protection technology and analysis methods and after the Chernobyl accident it was decided to revise the existing Guide. The present Safety Guide is intended to advise designers, safety assessors and regulators on the concept of fire protection in the design of nuclear power plants and on recommended ways of implementing the concept in some detail in practice. Figs, 1 tab

  1. Solar Power System SPS: a small 10 kWe pilot plant for solar thermal power production; Solar Power System SPS: projet d'une mini centrale pilote electro-thermo-solaire de 10 kWe

    Energy Technology Data Exchange (ETDEWEB)

    Pecoud, C.; Breguet, R.; Allani, Y.

    2000-07-01

    This rapport presents the second phase of the development of a concentrating solar collector, including performance optimisation and manufacturing cost reduction. This collector of the parabolic trough type is intended to be used in small units for solar thermal power production in countries with sunny arid climate, with an electric power of about 10 kW. Various technical aspects of the parabolic trough construction like mechanical rigidity, choice of the different materials and welding problems as well as the adopted solutions are described. Comments are given on the economic future of this product and potential clients.

  2. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1997 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1997; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; forecasts; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  3. Systems Modeling for Z-IFE Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Meier, W R

    2006-11-08

    A preliminary systems model has been developed for Z-IFE power plants. The model includes cost and performance scaling for the target physics, z-pinch driver, chamber, power conversion system and target/RTL manufacturing plant. As the base case we consider the dynamic hohlraum target and a thick liquid wall chamber with flibe as the working fluid. Driver cost and efficiency are evaluated parametrically since various options are still being considered. The model allows for power plants made up of multiple chambers and power conversion units supplied by a central target/RTL manufacturing plant. Initial results indicate that plants with few chambers operating at high yield are economically more attractive than the 10-unit plant previously proposed. Various parametric and sensitivity studies have been completed and are discussed.

  4. Atucha I nuclear power plant transients analysis

    International Nuclear Information System (INIS)

    A program for the transients simulation thermohydraulic calculation without loss of coolant (KWU-ENACE development) to evaluate Atucha I nuclear power plant behaviour is used. The program includes systems simulation and nuclear power plants control bonds with real parameters. The calculation results show a good agreement with the output 'protocol' of various transients of the nuclear power plant, keeping the error, in general, lesser than ± 10% from the variation of the nuclear power plant's state variables. (Author)

  5. International assistance to upgrade the safety of Soviet-designed nuclear power plants. Selected activities in Eastern and Central Europe and the countries of the former Soviet Union

    International Nuclear Information System (INIS)

    The overview is merely a snapshot of nuclear safety activities to assist the countries of Eastern and Central Europe and the former Soviet Union. While many other activities are planned or ongoing, this publication is meant to provide a general overview of the world community's commitment to improving the safety of Soviet-designed nuclear reactors

  6. Advanced Coordinating Control System for Power Plant

    Institute of Scientific and Technical Information of China (English)

    WU Peng; WEI Shuangying

    2006-01-01

    The coordinating control system is popular used in power plant. This paper describes the advanced coordinating control by control methods and optimal operation, introduces their principals and features by using the examples of power plant operation. It is wealthy for automation application in optimal power plant operation.

  7. New hydro power plant Dobsina III

    International Nuclear Information System (INIS)

    Another power plant will be added to the hydroelectric power plant Dobsina. Preparations for the construction of a small hydro power plant have started on the streams Hnilec and Dobsinsky Brook. Dobsina III will extend the portfolio of renewable sources of Slovenske elektrarne. (author)

  8. Occupational dose control in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Reduction in occupational exposure at nuclear power plants is desirable not only in the interest of the health and safety of plant personnel, but also because it enhances the safety and reliability of the plants. This report summarises the current trends of doses to workers at nuclear power plants and the achievements and developments regarding methods for their reduction

  9. Central solar heating plants with seasonal storage

    Energy Technology Data Exchange (ETDEWEB)

    Breger, D.S.; Sunderland, J.E.

    1989-03-01

    The University of Massachusetts has recently started a two year effort to identify and design a significant Central Solar Heating Plant with Seasonal Storage (CSHPSS) in Massachusetts. The work is closely associated with the U.S. participation in the International Energy Agency (IEA) Task on CSHPSS. The University is working closely with the Commonwealth of Massachusetts to assist in identifying State facilities as potential sites and to explore and secure State support which will be essential for product development after the design phase. Currently, the primary site is the University of Massachusetts, Amherst campus with particular interest in several large buildings which are funded for construction over the next 4-5 years. Seasonal thermal energy storage will utilize one of several geological formations.

  10. Integrated plant safety assessment: systematic evaluation program. Oyster Creek nuclear generating station. GPU Nuclear Corporation and Jersey Central Power and Light Company. Docket No. 50-219

    International Nuclear Information System (INIS)

    The Systematic Evaluation Program was initiated in February 1978 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the Oyster Creek Nuclear Generating Station (located in Ocean County, New Jersey), one of ten plants reviewed under Phase II of this program, and indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  11. Nuclear power plant operating experience, 1976

    International Nuclear Information System (INIS)

    This report is the third in a series of reports issued annually that summarize the operating experience of U.S. nuclear power plants in commercial operation. Power generation statistics, plant outages, reportable occurrences, fuel element performance, occupational radiation exposure and radioactive effluents for each plant are presented. Summary highlights of these areas are discussed. The report includes 1976 data from 55 plants--23 boiling water reactor plants and 32 pressurized water reactor plants

  12. 15 years of production of electric energy of the Laguna Verde power plant, its plans and future; 15 anos de produccion de energia electrica de la Central Laguna Verde, sus planes y futuro

    Energy Technology Data Exchange (ETDEWEB)

    Rivera C, A. [CFE, Central Laguna Verde, Km. 42.5 Carretera Cardel-Nautla, Veracruz (Mexico)]. e-mail: arr99999@cfe.gob.mx

    2005-07-01

    In the year 2005 Laguna Verde power plant reaches 15 years of producing electric power in Mexico arriving to but of 100 million Megawatts-hour from their beginning of commercial activities. The Unit 1 that entered at July 29, 1990 and the Unit 2 at April 10, 1995, obtaining the Disposability Factors from their origin is: 84.63% in Unit 1 and 83.67% in Unit 2. The march of the X XI century gives big challenges of competition to the Laguna Verde Central, with the possible opening of the electric market to private investment, for their Goals and Objectives of a world class company, taking the evaluation system and qualification of the World Association of Nuclear Operators (WANO) that promotes the Excellence in the operation of the nuclear power stations in all their partners. This Association supports the development of programs that allow the monitoring of the behavior in Safety Culture, Human fulfilment, Equipment reliability, Industrial Safety, Planning, Programming and Control, Personalized Systematic Training, and the use of the Operational experience in the daily tasks. The present work tries to explain the system of evaluation/qualification of WANO, the definition of Goals and Objectives to reach the excellence and of the programs, it will present the Program of the Reliability of Equipment with its main actions the productivity. (Author)

  13. Central receiver solar thermal power system. Phase 1. CDRL item 2; Pilot Plant preliminary design report. Volume II. System decription and system analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    An active system analysis and integration effort has been maintained. These activities have included the transformation of initial program requirements into a preliminary system design, the evolution of subsystem requirements which lay the foundation for subsystem design and test activity, and the overseeing of the final preliminary design effort to ensure that the subsystems are operationally compatible and capable of producing electricity at the lowest possible cost per unit of energy. Volume II of the Preliminary Design Report presents the results of the overall system effort that went on during this contract. The effort is assumed to include not only the total system definition and design but also all subsystem interactions.

  14. Wind Power Plant Control - An Overview

    OpenAIRE

    Altin, Müfit; Teodorescu, Remus; Bak-Jensen, Birgitte; RODRIGUEZ, Pedro; Iov, Florin; Kjær, Philip C.

    2010-01-01

    Recent developments in wind turbine technology go towards installation of larger Wind Power Plants (WPPs). Therefore, power system operators have been challenged by the WPP penetration impacts in order to maintain reliabillity and stability of the power system. The revised grid codes have concentrated on the WPP connection point and as a result a WPP is considered as a single power plant. Nevertheless, compared to conventional power plants, WPPs have different inherent features such as conver...

  15. Modular plants with high power gas engines (1 to 30 MWe); Centrales modulaires a moteurs gaz de forte puissance (de 1 a 30 MWe)

    Energy Technology Data Exchange (ETDEWEB)

    Haushalter, J. [Wartsila NSD (France)

    1997-12-31

    After a review of pollution regulations in France and Europe for high capacity combustion plants, the Wartsila NSD spark ignition combustion system, using natural gas, is presented: the air-gas mixture in the combustion chamber is very weak (lambda is around 2-2.2) and its ignition is completed by the flame exiting the pre-chamber containing a stoichiometric mixture, and the spark plug. The temperature is decreased thus lowering the NOx emission level. The combustion system is integrated in the Pure Energy global concept (cogeneration plants, etc.) from Wartsila

  16. Conceptual Design of a 100 MWe Modular Molten Salt Power Tower Plant

    Energy Technology Data Exchange (ETDEWEB)

    James E. Pacheco; Carter Moursund, Dale Rogers, David Wasyluk

    2011-09-20

    A conceptual design of a 100 MWe modular molten salt solar power tower plant has been developed which can provide capacity factors in the range of 35 to 75%. Compared to single tower plants, the modular design provides a higher degree of flexibility in achieving the desired customer's capacity factor and is obtained simply by adjusting the number of standard modules. Each module consists of a standard size heliostat field and receiver system, hence reengineering and associated unacceptable performance uncertainties due to scaling are eliminated. The modular approach with multiple towers also improves plant availability. Heliostat field components, receivers and towers are shop assembled allowing for high quality and minimal field assembly. A centralized thermal-storage system stores hot salt from the receivers, allowing nearly continuous power production, independent of solar energy collection, and improved parity with the grid. A molten salt steam generator converts the stored thermal energy into steam, which powers a steam turbine generator to produce electricity. This paper describes the conceptual design of the plant, the advantages of modularity, expected performance, pathways to cost reductions, and environmental impact.

  17. Modular stellarator reactor: a fusion power plant

    International Nuclear Information System (INIS)

    A comparative analysis of the modular stellarator and the torsatron concepts is made based upon a steady-state ignited, DT-fueled, reactor embodiment of each concept for use as a central electric-power station. Parametric tradeoff calculations lead to the selection of four design points for an approx. 4-GWt plant based upon Alcator transport scaling in l = 2 systems of moderate aspect ratio. The four design points represent high-aspect ratio. The four design points represent high-(0.08) and low-(0.04) beta versions of the modular stellarator and torsatron concepts. The physics basis of each design point is described together with supporting engineering and economic analyses. The primary intent of this study is the elucidation of key physics and engineering tradeoffs, constraints, and uncertainties with respect to the ultimate power reactor embodiment

  18. Power plant intake entrainment analysis

    International Nuclear Information System (INIS)

    Power plant condenser cooling water intake entrainment of fish eggs and larvae is becoming an issue in evaluating environmental impacts around the plants. Methods are required to evaluate intake entrainment on different types of water bodies. Presented in this paper is a derivation of the basic relationships for evaluating entrainment from the standing crop of fish eggs and larvae for different regions of a water body, and evaluating the rate of entrainment from the standing crop. These relationships are coupled with a 3D hydrodynamic and transport model that provides the currents and flows required to complete the entrainment evaluation. Case examples are presented for a simple river system, and for the more complex Delaware River Estuary with multiple intakes. Example evaluations are made for individual intakes, and for the cumulative impacts of multiple intakes

  19. Directory of nuclear power plants in the world, 1985

    International Nuclear Information System (INIS)

    This book presents technical information and estimates trends of load factors and construction costs of nuclear power plants. Particularly road maps indicating plants are drawn in, which would be practical in visiting them. The data used here are directly confirmed by operators in every part of the world. Therefore, they reflect up-to-date nuclear power developments and its future. This allows wide and exact understanding of world's nuclear power. Chapter 1 presents nuclear power growth around the world and estimates forecasts based on information from electric power companies: nuclear power growths and the growths in the number of reactors around the world, in WOCA (World outside the Centrally Planned Economies Area), in CPEA (Centrally Planned Economies Area) are analyzed in detail. Chapter 2 presents nuclear power plants on maps by country. The maps show exact locations of nuclear power plants with local cities around them, rivers and lakes. For convenience, symbols are given to aid in identifying the types of reactors. Chapter 3 presents general information of nuclear power plants. Also the addresses of operators, all segments of nuclear power supply industries and nuclear organizations are included. For convenience, the index of nuclear power plants is added. Chapter 4 presents technical information, road maps in large scales and photographs of nuclear power plants in the world. The road maps show exact locations of plants. Chapter 5 presents operating experiences, load factors, refuelling and maintenance outages. The trends of data are analyzed both regionally (WOCA, CPEA) and world-widely. Chapter 6 presents trends of construction costs, component costs as percent of total construction costs and direct costs, and construction durations. (J.P.N.)

  20. Central Asian gas in Eurasian power game

    International Nuclear Information System (INIS)

    Following the dissolution of the Soviet Union, various gas pipeline projects have been proposed to diversify transit routes and export markets of the landlocked Central Asian states. To evaluate the pipeline project's impact on the players' bargaining power, I apply the cooperate game theory to a quantitative model of the Eurasian gas trade and quantify the bargaining power structure via the Shapley value. Due to ample production capacities in Central Asia, I observe little strategic interaction between the West and China. Thus, demand competition with China is not necessarily a disadvantage for the West, and the Turkmenistan–China pipeline does not affect the impact of the westbound projects aiming Europe and Turkey. For Turkmenistan, i.e., the main supplier in the region, a link via the Caspian Sea to Turkey is the most beneficial westbound option. Although the projects carrying gas from Azerbaijan and Turkmenistan to Europe enjoy the European Commission's political support, they yield marginal benefits to the European consumers. Thanks to its transit position, Turkey collects a large share of the benefits in the East–West gas trade. - Highlights: • The Eurasian gas trade is represented as a cooperative game which is solved with the Shapley value. • There is no demand competition between the West and China for Central Asian gas. • For Turkmenistan the route via the Caspian Sea is the most beneficial westbound pipeline option. • Turkey emerges as a transit country and collects a large share of the benefits from the East–West gas trade. • A link to Europe yields marginal benefits to Turkmenistan and Europe

  1. Design of nuclear power plants

    International Nuclear Information System (INIS)

    The criteria of design and safety, applied internationally to systems and components of PWR type reactors, are described. The main criteria of the design analysed are: thermohydraulic optimization; optimized arrangement of buildings and components; low costs of energy generation; high level of standardization; application of specific safety criteria for nuclear power plants. The safety criteria aim to: assure the safe reactor shutdown; remove the residual heat and; avoid the release of radioactive elements for environment. Some exemples of safety criteria are given for Angra-2 and Angra-3 reactors. (M.C.K.)

  2. Nuclear power plant simulator software

    International Nuclear Information System (INIS)

    The development is described of software for the simulator of technological equipment of a WWER-440 nuclear power plant unit, using an SM 4-20 computer operating under DOS RV V2 and using a FORTRAN translator. An asynchronous interrupt system is used for kayboard control. All utilities for I/0 operations are written in the macroassembler. The basic concept of the software is shown schematically as are the relations between the program modules and the instructor and student environment. (J.B.). 1 fig

  3. Modelling of nuclear power plant decommissioning financing

    International Nuclear Information System (INIS)

    Costs related to the decommissioning of nuclear power plants create a significant financial burden for nuclear power plant operators. This article discusses the various methodologies employed by selected European countries for financing of the liabilities related to the nuclear power plant decommissioning. The article also presents methodology of allocation of future decommissioning costs to the running costs of nuclear power plant in the form of fee imposed on each megawatt hour generated. The application of the methodology is presented in the form of a case study on a new nuclear power plant with installed capacity 1000 MW. (authors)

  4. Nuclear Power Plant Control and Instrumentation 1989

    International Nuclear Information System (INIS)

    The meeting of the International Working Group on Nuclear Power Plant Control and Instrumentation (IWG-NPPCI) was organized in order to summarize operating experience of nuclear power plant control systems, gain a general overview of activities in development of modern control systems and receive recommendations on the further directions and particular measures within the Agency's programme. The meeting was held at the IAEA Headquarters in Vienna and was attended by 21 national delegates and observers from 18 countries. The present volume contains: (1) report on the meeting of the IWG-NPPCI, Vienna, 8-10 May 1989, (2) report of the scientific secretary on the major activities of IAEA during 1987-89 in the NPPCI area, (3) terms of reference International Working Group on NPPCI and (4) reports of the national representatives to the International Working Group on NPPCI. The paper and discussions with practical experience and described actual problems encountered. Emphasis was placed on the technical, industrial and economical aspects of the introduction of modern control systems and on the improvement of plant availability and safety. A separate abstract was prepared for each of the 19 papers presented by members of the International Working Group. Refs, figs and tabs

  5. Water power generation plant. Development of simulator for traning of operators in centralized control room; Suiryokuhatsu henden setsubi. Shuchu seigyo unten kunren`yo simulator no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Katsuragi, A. [Electric Power Development Co. Ltd., Tokyo (Japan)

    1997-04-01

    The Power Source Development Co., Ltd. Developed the `simulator for training of operation by local control system` and started the training from October 1996. The simulator was installed for the purpose of maintaining and improving the ability of operators of local control center to compete with accidents, failures and abnormal weather. The simulator is characterized by the equipment which provides the feeling of presence at the maximum and the training by professional trainers. In order to simulate the system, water system, and operation of facilities, the following models were prepared: (1) System simulation model consisting of tidal current calculation function, and frequency simulation function with independent system. It simulates the active power, reactive power, voltage, current, and frequency within a second. (2) Water system model consisting of calculation function of water volume due to the rainfall, of water flow in river, and of water level in dam. It simulates the whole behavior of water system. (3) Facility operation simulation model consisting of breaker model, power generator model, FC model, and AFC device model. 5 figs.

  6. The atlas of large photovoltaic power plants

    International Nuclear Information System (INIS)

    This document reports all the photovoltaic power plants whose installed power is over 1 MWc and that are operating in France or in project. 446 power plants have been reviewed and their cumulated power reaches 2822 MWc. For each plant the following information is listed: the name of the municipality, the operator, the power capacity, the manufacturer of the photovoltaic panels and the type of technology used, the type of installation (on the ground, on the roof, on the facade, as sun protection,...), the yearly power output (kWh), and the date of commissioning. This review shows that 86% of these plants are ground-based. (A.C.)

  7. 47 CFR 15.111 - Antenna power conduction limits for receivers.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Antenna power conduction limits for receivers... DEVICES Unintentional Radiators § 15.111 Antenna power conduction limits for receivers. (a) In addition to... CB receivers that provide terminals for the connection of an external receiving antenna may be...

  8. Construction, Maintenance and Demolition of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  9. Sabotage at Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Purvis, James W.

    1999-07-21

    Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented.

  10. Sabotage at Nuclear Power Plants

    International Nuclear Information System (INIS)

    Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented

  11. Nuclear Power in South-Central Brazil

    International Nuclear Information System (INIS)

    The region of South-Central Brazil includes the states of Sao Paulo, Rio de Janeiro, Guanabara and Minas Gerais. The most recent power study was made by Canambra Engineering Consultants Limited. This group reported that the public-grid electricity output for the area in 1962 was 2.16 GW (average generation), with an installed capacity of 3.41 GW and annual mean load factor of 63.4; an increase in power requirements for 1970 was forecast, corresponding to an average output of 5.37 GW and an installed capacity of 8.3 GW. This forecast was based on an annual growth rate of 11.9% in generation. ''The energy requirements have grown at an average annual rate of 10.9% since 1955; however, the present forecast is based on the assumption of power being available as required, and hence includes the suppressed demand resulting from existing restrictions in generating and distribution capacity''

  12. Optimal concentration and temperatures of solar thermal power plants

    International Nuclear Information System (INIS)

    Highlights: ► Efficiency is strongly influenced by receiver and condenser thermal resistances. ► Optimal receiver temperatures are much higher for molten salts than direct steam. ► Optimal concentrations are much higher for molten salts than direct steam. - Abstract: Using simple, finite-time, thermodynamic models of solar thermal power plants, the existence of an optimal solar receiver temperature has previously been demonstrated in literature. Scant attention has been paid, however, to the presence of an optimal level of solar concentration at which solar-to-electric efficiency is maximised. This paper addresses that gap. A simple mathematical model is developed to assess the influence of key system temperatures, thermal conductances and the receiver irradiance (radiation striking unit receiver area) upon the optimal receiver temperature and solar-to-electric efficiency of Rankine-cycle, solar-trough and solar-tower, direct-steam and molten-salts, power plants. The analysis shows that, as the thermal resistance of the solar receiver and condenser increases, the optimal receiver temperature increases whilst the optimal receiver irradiance decreases. The optimal level of receiver irradiance, for solar thermal plants employing a service fluid of molten salts, is found to occur within a range of values achievable using current solar tower technologies. The efficiency trade-off involved in using molten salts rather than direct steam is investigated. The optimal receiver temperatures calculated suggest the use of sub-critical Rankine cycles for solar trough plants, but super-critical Rankine cycles for solar tower plants, if the objective is to maximise solar-to-electric efficiency.

  13. Bubbling fluidized bed boiler for Vanaja power plant

    Energy Technology Data Exchange (ETDEWEB)

    Sormunen, R.; Haermae, P.; Vessonen, K.; Ketomaeki, A. [ed.

    1998-07-01

    At the Vanaja Power Plant, on the outskirts of Haemeenlinna, there have been changes which reflect the central goals in IVO`s product development work. At Vanaja, efficiency is combined with environmental friendliness. In the early 1980s, the plant was modernized to produce district heat in addition to electricity. At that time, along with the new gas turbine at the plant, the main fuel, coal, while remaining the fuel for the old boilers, was replaced by natural gas. This year a new type of bubbling fluidized bed boiler enabling continuous use of peat and trial use of biofuels along with coal was introduced at the plant. In addition to the Nordic countries, this kind of technology is required in central eastern Europe, where modernization of ageing power plants is being planned to achieve the best possible solutions in respect of production and the environment. IVO develops a new repair technique for underwater sites

  14. The deconstruction of EDF nuclear power plants - Information note September 2011; La deconstruction des centrales nucleaires EDF - Note d'information Septembre 2011

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Lionel

    2012-01-10

    As nine nuclear reactors are being deconstructed, this document outlines EDF commitment in this deconstruction, and the fact that this deconstruction is a long process which comprises several phases (stopping the reactor, partial and total dismantling). It presents the CIDEN (Deconstruction and Environment Engineering Centre), an expertise centre specialised in plant deconstruction. It briefly addresses the issue of deconstruction wastes: there are different types of wastes (conventional wastes and wastes with different levels of radioactivity), and different associated storage sites. The document highlights the importance of public, personnel and environment protection for these operations, and evokes the financial issue. Finally, the industrial project ICEDA (packaging and warehousing installation for activated wastes) is presented

  15. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. These data come from the IAEA's PRIS and AREVA-CEA's GAIA databases. The following aspects are reviewed: 2007 highlights; Main characteristics of reactor types; Map of the French nuclear power plants on 2007/01/01; Worldwide status of nuclear power plants (12/31/2007); Units distributed by countries; Nuclear power plants connected to the Grid- by reactor type groups; Nuclear power plants under construction on 2007; Evolution of nuclear power plants capacities connected to the grid; First electric generations supplied by a nuclear unit in each country; Electrical generation from nuclear power plants by country at the end 2007; Performance indicator of French PWR units; Evolution of the generation indicators worldwide by type; Nuclear operator ranking according to their installed capacity; Units connected to the grid by countries at 12/31/2007; Status of licence renewal applications in USA; Nuclear power plants under construction at 12/31/2007; Shutdown reactors; Exported nuclear capacity in net MWe; Exported and national nuclear capacity connected to the grid; Exported nuclear power plants under construction; Exported and national nuclear capacity under construction; Nuclear power plants ordered at 12/31/2007; Long term shutdown units at 12/31/2007; COL (combined licences) applications in the USA; Recycling of Plutonium in reactors and experiences; Mox licence plants projects; Appendix - historical development; Meaning of the used acronyms; Glossary

  16. General digitalized system on nuclear power plants

    International Nuclear Information System (INIS)

    Hitherto, instrumentation control system in a PWR nuclear power plant has stepwisely adopted digital technology such as application of digital instrumentation control device to ordinary use (primary/secondary system control device, and so on), application of CRT display system to monitoring function, and so forth, to realize load reduction of an operator due to expansion of operation automation range, upgrading of reliability and maintenance due to self-diagnosis function, reduction of mass in cables due to multiple transfer, and upgrading of visual recognition due to information integration. In next term PWR plant instrumentation control system, under consideration of application practice of conventional digital technology, application of general digitalisation system to adopt digitalisation of overall instrumentation control system containing safety protection system, and central instrumentation system (new type of instrumentation system) and to intend to further upgrade economics, maintenance, operability/monitoring under security of reliability/safety is planned. And, together with embodiment of construction program of the next-term plant, verification at the general digitalisation proto-system aiming at establishment of basic technology on the system is carried out. Then, here was described on abstract of the general digitalisation system and characteristics of a digital type safety protection apparatus to be adopted in the next-term plant. (G.K.)

  17. Profitability of small-scale power plants

    International Nuclear Information System (INIS)

    Several small-scale power plants have been constructed in Finland during the last few years. Fuel oil and natural gas has been used as a fuel in diesel plants, natural gas in gas-turbine plants, and peat and industrial waste wood in solid fuel fired plants. Larger towns have already acquired combined power and heat generation either in their own power plants or in cooperation with industry. A usual mean of cooperation has been buying of district heat from industrial back-pressure power plants. Numerous small district heat loads still rely on separate heat production. The cheap price of electric power, caused by the good water and nuclear power conditions and long-term delivery contracts, has rendered the construction of small-scale power plants. The fuel prices have been stable for the last few years. The most significant changes have been caused by changing of exchange rate of the Finnish mark and the fuel taxation. Two power plant are reviewed in detail: 6/17 MW peat fired steam power plant and 6/6 MW oil fueled diesel power plant. The electricity prices of these two have been compared with coal condensing power and the electricity tariffs. The price comparisons have been made using the present price level. Energia-Ekono has compiled a new simulation program ELMO, operating in PC-WINDOWS environment, for simulation of cogeneration

  18. International seminar on biomass and fossil fuels co-firing in power plants and heating plants in Europe; Seminaire international sur la cocombustion de biomasse et d'energies fossiles dans les centrales electriques et les chaufferies en Europe

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The aim of the European commission which has fixed to 12% the share of renewable energies in the total energy consumption up to 2010, is to develop the biomass sector. Co-firing is a solution that allows to increase significantly the use of biomass because it does not require important investments. Today, about 150 power plants in Europe use co-firing. An Altener project named 'Cofiring' has ben settled in order to bring together and analyze the European experience in this domain and to sustain and rationalize the design of future projects. The conclusions of this study, coordinated by VTT Energy and which involves CARMEN (Germany), CBE (Portugal), the Danish centre for landscape and planning, ITEBE (France), KOBA (Italy), SLU (Sweden), and EVA (Austria), were presented during this international seminar. (J.S.)

  19. Capital cost: pressurized water reactor plant. Commerical electric power cost studies

    International Nuclear Information System (INIS)

    The investment cost study for the 1139-MW(e) pressurized water reactor (PWR) central station power plant consists of two volumes. This volume includes in addition to the foreword and summary, the plant description and the detailed cost estimate

  20. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico. Part 2; Conformacion de un proceso de evaluacion para una solicitud de renovacion de licencia de una central nuclear en Mexico. Parte 2

    Energy Technology Data Exchange (ETDEWEB)

    Serrano R, M. de L., E-mail: mlserrano@cnsns.gob.mx [Comision Nacional de Seguridad Nuclear y Salvaguardias, Dr. Jose Ma. Barragan 779, Col. Narvarte, 03020 Mexico D. F. (Mexico)

    2013-10-15

    At the present time the operation licenses in force for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) will expire in the year 2020 and 2025 for the Unit-1 and Unit-2, respectively, for which the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) has begun its preparation to assist a solicitude of the licensee to continue the operation of the NPP-L V. The present work has the purpose of defining the steps to continue and to generate the documents that would help in this process, as the normative, guides, procedures, regulations, controls, etc. so that the evaluation process will be effective and efficient, as much for the regulator organ as for the licensee. The advance carried out in the continuation of the conformation of an evaluation process of license renovation solicitude is also exposed, taking like base the requirements established by the CNSNS, the regulator organ of the United States (US NRC), and the IAEA for license renovation solicitude of this type. A summary of the licenses granted from the beginning of commercial operation of the NPP-L V is included, both units and the amendments to these licenses, explaining the reason of the amendment shortly and in the dates they were granted. A brief exposition of the nuclear power plants to world level that have received extension of its operation is included. The normative that can be applied in a life extension evaluation is presented, the evaluation process to continue with the guides of the US NRC, the reach of the evaluation and the minimum information required to the licensee that should accompany to their solicitude. (author)

  1. steam power plants re powering with gas turbine review

    International Nuclear Information System (INIS)

    Re powering faith gas turbine means integration of new gas turbine in existing power plant. Such integration yield higher efficiencies lower operating and maintenance costs and reduction in pollution emission. This paper summarizes the results of a feasibility study that inquired the possibilities of such integration in Israel Electric Corporation - IEC's existing steam power plants (oil fired)

  2. Nuclear power plants and the environment

    International Nuclear Information System (INIS)

    The environmental impacts are compared of conventional coal-fired and oil-fired power plants and of nuclear power plants. The values are compared of SO2, NO2, ash and soot emmisions with 133Xe and 85Kr fission products release and the requirement for air for diluting these emissions in the atmosphere is assessed. Also compared are thermal pollution from an oil-fired power plant and from PWR and fast reactor power plants. The conclusion is arrived at that nuclear energy can solve the problem of increasing demand for electric and heat power while reducing negative environmental impacts. (O.K.)

  3. Thermal power plant design and operation

    CERN Document Server

    Sarkar, Dipak

    2015-01-01

    Thermal Power Plant: Design and Operation deals with various aspects of a thermal power plant, providing a new dimension to the subject, with focus on operating practices and troubleshooting, as well as technology and design. Its author has a 40-long association with thermal power plants in design as well as field engineering, sharing his experience with professional engineers under various training capacities, such as training programs for graduate engineers and operating personnel. Thermal Power Plant presents practical content on coal-, gas-, oil-, peat- and biomass-fueled thermal power

  4. Which are the competitors for a fusion power plant?

    International Nuclear Information System (INIS)

    The (future) competitive position of central-station fusion power will depend on the resolution of several broad public-policy issues, including the provision of adequate electrical energy to a growing world population and the interaction of economic and environmental considerations meeting evolving standards of public acceptance and regulatory compliance. Candidate baseload central-station power plants, fusion or other, will be expected to contend for preferential market penetration against an evolving set of performance indicators or metrics (e.g. cost of electricity) reflecting societal 'customer preferences' for abundant, affordable, safe, reliable, and environmentally benign sources. This competition is enhanced by transitions to price-deregulated regimes, overlaid by nuclear uncertainites and evolution beyond carbon-based fuels toward more renewables in the energy mix. From these top-level considerations, quantifiable attributes, including plant size (output), system power density, surface heat flux, recirculating power fraction, power-conversion efficiency, waste streams, and forced- and planned-outage rates emerge

  5. Electric power generation in large-scale power plants

    International Nuclear Information System (INIS)

    Future electric power consumption will be depending on the economic development of the Federal Republic of Germany. Thermal power plants are fueled with non-renewable energy sources, i.e. coal, petroleum, natural gas or nuclear power. It is therefore important to assess the global coverage of these energy sources and to take stock of the reserves of the Federal Republic of Germany. If the waste heat left from electric power generation was made use of in dual-purpose power plants total energy consumption could be considerably reduced. Large-scale power plants do have to face and cope with the lack of distribution networks to supply the consumer. (DG)

  6. The central government power generating capacity- reforms and the future

    International Nuclear Information System (INIS)

    The alarming resource gap that the states were facing in 1970's has prompted the Central Government to augment the resources for power generation by creating two new entities in November 1975 viz the National Thermal Power Corporation (NTPC) and National Hydro Power Corporation (NHPC). Few other organisations also exist in central sector which are engaged in power generation like Nuclear Power Corporation (NPC). NTPC being the leading player in the power sector, it can neither be indifferent nor dissociate itself from the reforms sweeping the sector today. The article describes the Central Government's role in power generation, reforms and NTPC and further prospects of NTPC

  7. QA programs in nuclear power plants

    International Nuclear Information System (INIS)

    As an overview of quality assurance programs in nuclear power plants, the energy picture as it appears today is reviewed. Nuclear power plants and their operations are described and an attempt is made to place in proper perspective the alleged ''threats'' inherent in nuclear power. Finally, the quality assurance programs being used in the nuclear industry are described

  8. Nuclear power plant control system

    International Nuclear Information System (INIS)

    Purpose: To effectively transfer the operation of a nuclear power plant including a bwr type reactor to single load operation in the station with no increase in the neutron flux and water level in the reactor by the combined use of recycle pump trip and feedwater pump trip. Method: Upon rapid load decrease in a turbine generator, at least one of usually operated feedwater pumps and a recycle pump are tripped and the starting for a stand-by feedwater pump is inhibited. This rapidly decreases the recycling flow rate to thereby lower the neutron flux before generation of pressure increase and also decreases the feedwater flow rate to thereby suppress the increase in the water level due to increase in voids, whereby the operation is smoothly transferred to the single load operation in the station. (Horiuchi, T.)

  9. A landscape simulation system for power plants

    International Nuclear Information System (INIS)

    As scenes of power plants give many influences to environments, the plants that harmonized with the environments are demanded. We developed a landscape simulation system for the plants by using computer graphics technologies. This system has functions to generate realistic images about plant buildings and environments. Since the system contains information of ridge lines in addition to usual terrain data, the terrain shapes are expressed more precisely. Because the system enables users to visualize plant construction plans, the advance evaluations of plant scenes become possible. We regard this system as useful for environmental assessment of power plants. (author)

  10. Financing of nuclear power plant using resources of power generation

    International Nuclear Information System (INIS)

    It is proved that during the lifetime of a power plant, financial resources are produced from depreciation and from the profit for the delivered electrical power in an amount allowing to meet the cost of construction, interests of credits, the corporation taxes, and the means usable by the utility for simple reproduction of the power plant, additional investment, or for the ultimate decommissioning of the nuclear power plant. The considerations are simplified to 1 MW of installed capacity of a WWER-440 nuclear power plant. The breakdown is shown of the profit and the depreciation over the power plant lifetime, the resources of regular payments of credit instalments for the construction and the method of its calculation, and the income for the state budget and for the utility during the plant liofetime. (J.B.). 5 tabs., 5 refs

  11. Simulators predict power plant operation

    Energy Technology Data Exchange (ETDEWEB)

    Peltier, R.

    2002-07-01

    Mix the complexity of a new construction or major retrofit project with today's 'do more with less', a pinch of 'personnel inexperience,' and a dash of 'unintended consequences', and you have got a recipe for insomnia. Advanced simulation tools, however, can help you wring out your design train your operators before the first wire is terminated and just may be get a good night's rest. The article describes several examples of uses of simulation tools. Esscor recently completed a simulation project for a major US utility exploring the potential for furnace/duct implosion that could result from adding higher volumetric flow induced-draft fans and selective catalytic reduction to a 650-MW coal-fired plant. CAF Electronics Inc. provided a full-scope simulator for Alstom's KA24-1 combined-cycle power plant in Paris, France. Computational fluid dynamics (CFD) tools are being used by the Gas Technology Institute to simulate the performance of the next generation of pulverized coal combustors. 5 figs.

  12. Economics of hybrid photovoltaic power plants

    Energy Technology Data Exchange (ETDEWEB)

    Breyer, Christian

    2012-08-16

    The global power supply stability is faced to several severe and fundamental threats, in particular steadily increasing power demand, diminishing and degrading fossil and nuclear energy resources, very harmful greenhouse gas emissions, significant energy injustice and a structurally misbalanced ecological footprint. Photovoltaic (PV) power systems are analysed in various aspects focusing on economic and technical considerations of supplemental and substitutional power supply to the constraint conventional power system. To infer the most relevant system approach for PV power plants several solar resources available for PV systems are compared. By combining the different solar resources and respective economics, two major PV systems are identified to be very competitive in almost all regions in the world. The experience curve concept is used as a key technique for the development of scenario assumptions on economic projections for the decade of the 2010s. Main drivers for cost reductions in PV systems are learning and production growth rate, thus several relevant aspects are discussed such as research and development investments, technical PV market potential, different PV technologies and the energetic sustainability of PV. Three major market segments for PV systems are identified: off-grid PV solutions, decentralised small scale on-grid PV systems (several kWp) and large scale PV power plants (tens of MWp). Mainly by application of 'grid-parity' and 'fuel-parity' concepts per country, local market and conventional power plant basis, the global economic market potential for all major PV system segments is derived. PV power plant hybridization potential of all relevant power technologies and the global power plant structure are analyzed regarding technical, economical and geographical feasibility. Key success criteria for hybrid PV power plants are discussed and comprehensively analysed for all adequate power plant technologies, i.e. oil, gas and

  13. Professor receives award for molecular plant pathology research excellence

    OpenAIRE

    Whyte, Barry James

    2008-01-01

    Brett Tyler, professor at the Virginia Bioinformatics Institute and at the Department of Plant Pathology, Physiology, and Weed Science in Virginia Tech's College of Agriculture and Life Sciences, has been awarded the 2008 Noel T. Keen award for research excellence in molecular plant pathology.

  14. Dynamic Frequency Response of Wind Power Plants

    DEFF Research Database (Denmark)

    Altin, Müfit

    method has less impact of the power system frequency compared to existing control concepts. Another advantage of the proposed inertial response control has the tuning methodology which can be utilized as a generic approach for any power system with high wind power penetration levels. Additionally, an...... maintain sustainable and reliable operation of the power system for these targets, transmission system operators (TSOs) have revised the grid code requirements. Also, the TSOs are planning the future development of the power system with various wind penetration scenarios to integrate more wind power...... according to their grid codes. In these scenarios particularly with high wind power penetration cases, conventional power plants (CPPs) such as old thermal power plants are planned to be replaced with wind power plants (WPPs). Consequently, the power system stability will be affected and the control...

  15. TOSHIBA CAE system for nuclear power plant

    International Nuclear Information System (INIS)

    TOSHIBA aims to secure safety, increase reliability and improve efficiency through the engineering for nuclear power plant using Computer Aided Engineering (CAE). TOSHIBA CAE system for nuclear power plant consists of numbers of sub-systems which had been integrated centering around the Nuclear Power Plant Engineering Data Base (PDBMS) and covers all stage of engineering for nuclear power plant from project management, design, manufacturing, construction to operating plant service and preventive maintenance as it were 'Plant Life-Cycle CAE System'. In recent years, TOSHIBA has been devoting to extend the system for integrated intelligent CAE system with state-of-the-art computer technologies such as computer graphics and artificial intelligence. This paper shows the outline of CAE system for nuclear power plant in TOSHIBA. (author)

  16. Fusion power plant availability study

    International Nuclear Information System (INIS)

    The consideration of fusion as an alternative energy source will need to demonstrate that Fusion Power Plant (FPP) design, operating and maintenance characteristics meet the electrical market requirements forecast for the second half of this century. Until now, fusion has been developed in the framework of research and development programmes following natural technological trends. To bring a greater sense of realism to commercial viability and to guarantee that technology-driven fusion development responds to the demands of the market, a conceptual study of future commercial FPPs has been performed with a Power Plant Availability (PPA) study aimed at identifying the aspects affecting the availability and generating costs of FPPs. EFET, who has also been involved in the study, can visualise it from two different points of view; that of the industry (ANSALDO, IBERTEF, SIEMENS, NNC) and that of the utilities (BELGATOM, FRAMATOME, FORTUM). The work carried out covered the following points: socio-economic forecasting; safety and licensing; operation and maintenance; waste and decommissioning; availability and reliability. The following are the most relevant findings, conclusions and recommendations for all these aspects: Demonstrate definitively that the physical principles of nuclear fusion have been validated by means of experiments; Establish a European Industrial Group to support the demonstration phases; Create the financial and contracting framework required to construct these installations. Secure the necessary budgets for the European Union's 5th and 6th Research Programmes. Look for supplementary long term financing sources; The existing Regulatory Bodies should combine to form a single Working Group with responsibility for fusion reactor safety and licensing activities, working on the harmonisation of the regulatory processes, developing FPP safety criteria and guidelines and reviewing industry standards; To be competitive, FPPs should have high availability

  17. Nonlinear thermal and structural analysis of a brazed solar-central-receiver panel

    Energy Technology Data Exchange (ETDEWEB)

    Napolitano, L.M. Jr.; Kanouff, M.P.

    1981-07-01

    One part of the evaluation program for a molten sodium central receiver was to be a test of a reduced-scale panel at Sandia's Central Receiver Test Facility in Albuquerque. The panel incorporates a new way of joining tubes - brazing to intermediate filler strips - which can affect the panel's lifetime. To calculate the stresses and strains for the worst-case section of the experimental panel, we have done a nonlinear elastic-plastic analysis with the MARC finite element computer code, which takes the temperature dependence of the material properties into account. From the results, tube design lifetimes are predicted. The analysis shows that concerns for cracking and reduction in lifetime are warranted, but a more detailed fracture analysis is necessary to determine whether there is a stable-crack-growth problem.

  18. Corrosion protection system for nuclear power plant

    International Nuclear Information System (INIS)

    A cathodic corrosion protection system for a nuclear power plant which employs an ion tank adjacent the main fresh water feed pipe leading to the steam generator to treat water from the main feed pipe and then return the treated water to the main feed pipe to form a corrosion protecting alkaline layer on surfaces of the main feed pipe and the secondary side of the steam generator. The ion tank receives measured amounts of hydrazine to render the water therein substantially conductive and contains ionizable metal anodes which release free metal ions as electric current flows between the anodes and a cathode connection on an ion tank outlet pipe near the main feed water pipe

  19. Applications of power from Temelin nuclear power plant

    International Nuclear Information System (INIS)

    The proceedings contain 10 papers of which 9 fall under the INIS scope. They all concern the intentions and possibilities of using heat from nuclear power plants, especially from the Temelin power plant. Waste heat will be used for district heating of adjacent conurbations and for agricultural purposes. Various projects are presented using heat from nuclear power plants, such as greenhouse heating, soil heating, cultivation of algae and fish in warmed-up water. The existing experience is described with the use of heat from the Bohunice nuclear power plant. (M.D.). 15 figs., 6 tabs., 17 refs

  20. What about improving the productivity of electric power plants

    International Nuclear Information System (INIS)

    The FEA in April of 1974 established an Interagency Task Group on Power Plant Reliability, which was charged with the broad objective of improving the productivity of existing and planned large fossil-fueled and nuclear power plants. It took approximately 11 months for the task force to publish a report, ''Report on Improving the Productivity of Electrical Power Plants'' (FEA-263-G), a detailed analysis and comparison of successful and below-average-performance power plants. The Nuclear Service Corp. portion of this study examined four large central-station power plants: two fossil (coal) and two nuclear plants. Only plants with electrical generation capacities greater than 400 MWe were considered. The study included the following: staff technical skill, engineering support, QA program, plant/corporate coordination, operation philosophy, maintenance programs, federal/state regulations, network control, and equipment problems. Personnel were interviewed, and checklists providing input from some 21 or more plant and corporate personnel of each utility were utilized. Reports and other documentation were also reviewed. It was recognized early that productivity is closely allied to technical skills and positive motivation. For this reason, considerable attention was given to people in this study

  1. Solar Thermal Power Plants with Parabolic-Trough Collectors

    Science.gov (United States)

    Zarza, E.; Valenzuela, L.; León, J.

    2004-12-01

    Parabolic-trough collectors (PTC) are solar concentrating devices suitable to work in the 150°C- 400°C temperature range. Power plants based on this type of solar collectors are a very efficient way to produce electricity with solar energy. At present, there are eight commercial solar plants (called SEGS-II, III,.. IX) producing electricity with parabolic-trough collectors and their total output power is 340 MW. Though all SEGS plants currently in operation use thermal oil as a heat transfer fluid between the solar field and the power block, direct steam generation (DSG) in the receiver tubes is a promising option to reduce the cost of electricity produced with parabolic- trough power plants. Most of technical uncertainties associated to the DSG technology were studied and solved in the DISS project and it is expected that this new technology will be commercially available in a short term. In Spain, the Royal Decree No. 436/204 (March 12th , 2004) has defined a premium of 0,18€/kWh for the electricity produced by solar thermal power plants, thus promoting the installation of solar thermal power plants up to a limit of 200 MW. Due to the current legal and financial framework defined in Spain, several projects to install commercial solar power plants with parabolic-trough collectors are currently underway.

  2. PARTICLE SWARM OPTIMIZATION OF SOLAR CENTRAL RECEIVER SYSTEMS FROM A MONTE CARLO DIRECT MODEL

    OpenAIRE

    Farges, Olivier; Bézian, Jean-Jacques; El Hafi, Mouna; Fudym, Olivier; Bru, Hélène

    2013-01-01

    Considering the investment needed to build a solar concentrating facility, the performance of such an installation has to be maximized. This is the reason why the preliminary design step is one of the most important stage of the project process. This paper presents an optimization approach coupling a Particle Swarm Optimization algorithm with a Monte Carlo algorithm applied to the design of Central Receiver Solar systems. After the validation of the direct model from experimental data, severa...

  3. World power plant industry in recession

    International Nuclear Information System (INIS)

    Two scenarios of power plant ordering required to meet demand in 2000, based on reasonable assumptions of demand growth, plant lifetimes, and construction lead times, are presented. They result in a high and low of 191 and 75GWe per annum respectively. The scenarios are broken down into regions; Europe, North America, Japan, and less developed countries. It is thought that nuclear power is unlikely to gain a substantial share of the total power plant market. (U.K.)

  4. Study of environmental noise in a BWR plant like the Nuclear Power Plant Laguna Verde; Estudio de ruido ambiental en una planta BWR como la Central Nuclear Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Tijerina S, F.; Cruz G, M.; Amador C, C., E-mail: francisco.tijerina@cfe.gob.mx [Comision Federal de Electricidad, Central Nucleoelectrica Laguna Verde, Subgerencia de Ingenieria, Carretera Cardel-Nautla Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2013-10-15

    In all industry type the health costs generated by the noise are high, because the noise can cause nuisance and to harm the capacity to work when causing tension and to perturb the concentration, and in more severe cases to reach to lose the sense of the hearing in the long term. The noise levels in the industry have been designated for the different types of use like residential, commercial, and industrial and silence areas. The noise can cause accidents when obstructing the communications and alarm signs. For this reason the noise should be controlled and mitigated, at a low level as reasonably is possible, taking into account that the noise is an acoustic contamination. The present study determines a bases line of the environmental noise levels in a nuclear power plant BWR-5 as Laguna Verde, (like reference) to be able to determine and to give pursuit to the possible solutions to eliminate or to limit the noise level in the different job areas. The noise levels were registered with a meter of integrative noise level (sonometer) and areas of noise exposure levels mapping the general areas in the buildings were established, being the registered maximum level of 96.94 dba in the building of the Reactor-elevation 0.65 m under the operation conditions of Extended Power Up rate (EPU) of 120% PTN. Knowing that the exposition to noises and the noise dose in the job place can influence in the health and in the safety of the workers, are extensive topics that they should be analyzed for separate as they are: to) the effects in the health of the exposure to the noise, b) how measuring the noise, c) the methods and technologies to combat and to control the noise in the industry by part of engineering area and d) the function of the industrial safety bodies as delegates of the health and safety in the task against the noise in the job. (author)

  5. Stillwater Hybrid Geo-Solar Power Plant Optimization Analyses

    Energy Technology Data Exchange (ETDEWEB)

    Wendt, Daniel S.; Mines, Gregory L.; Turchi, Craig S.; Zhu, Guangdong; Cohan, Sander; Angelini, Lorenzo; Bizzarri, Fabrizio; Consoli, Daniele; De Marzo, Alessio

    2015-09-02

    The Stillwater Power Plant is the first hybrid plant in the world able to bring together a medium-enthalpy geothermal unit with solar thermal and solar photovoltaic systems. Solar field and power plant models have been developed to predict the performance of the Stillwater geothermal / solar-thermal hybrid power plant. The models have been validated using operational data from the Stillwater plant. A preliminary effort to optimize performance of the Stillwater hybrid plant using optical characterization of the solar field has been completed. The Stillwater solar field optical characterization involved measurement of mirror reflectance, mirror slope error, and receiver position error. The measurements indicate that the solar field may generate 9% less energy than the design value if an appropriate tracking offset is not employed. A perfect tracking offset algorithm may be able to boost the solar field performance by about 15%. The validated Stillwater hybrid plant models were used to evaluate hybrid plant operating strategies including turbine IGV position optimization, ACC fan speed and turbine IGV position optimization, turbine inlet entropy control using optimization of multiple process variables, and mixed working fluid substitution. The hybrid plant models predict that each of these operating strategies could increase net power generation relative to the baseline Stillwater hybrid plant operations.

  6. Investigation toward laser driven IFE power plant

    International Nuclear Information System (INIS)

    Inertial fusion energy (IFE) is becoming feasible due to the increasing understanding of implosion physics. Reactor technology issues have begun to be developed. Based on the conceptual design of Laser Driven IFE Power Plant, the technical and physical issues have been examined. R and D on key issues that affect the feasibility of power plant have been proceeded taking into account the collaboration in the field of laser driver, fuel pellet, reaction chamber and system design. It is concluded that the technical feasibility of IFE power plant seems to be reasonably high. Coordination and collaboration scheme of reactor technology experts in Japan on Laser Driven IFE Power Plant is being proceeded. (author)

  7. Methodology for Scaling Fusion Power Plant Availability

    Energy Technology Data Exchange (ETDEWEB)

    Lester M. Waganer

    2011-01-04

    Normally in the U.S. fusion power plant conceptual design studies, the development of the plant availability and the plant capital and operating costs makes the implicit assumption that the plant is a 10th of a kind fusion power plant. This is in keeping with the DOE guidelines published in the 1970s, the PNL report1, "Fusion Reactor Design Studies - Standard Accounts for Cost Estimates. This assumption specifically defines the level of the industry and technology maturity and eliminates the need to define the necessary research and development efforts and costs to construct a one of a kind or the first of a kind power plant. It also assumes all the "teething" problems have been solved and the plant can operate in the manner intended. The plant availability analysis assumes all maintenance actions have been refined and optimized by the operation of the prior nine or so plants. The actions are defined to be as quick and efficient as possible. This study will present a methodology to enable estimation of the availability of the one of a kind (one OAK) plant or first of a kind (1st OAK) plant. To clarify, one of the OAK facilities might be the pilot plant or the demo plant that is prototypical of the next generation power plant, but it is not a full-scale fusion power plant with all fully validated "mature" subsystems. The first OAK facility is truly the first commercial plant of a common design that represents the next generation plant design. However, its subsystems, maintenance equipment and procedures will continue to be refined to achieve the goals for the 10th OAK power plant.

  8. Methodology for Scaling Fusion Power Plant Availability

    International Nuclear Information System (INIS)

    Normally in the U.S. fusion power plant conceptual design studies, the development of the plant availability and the plant capital and operating costs makes the implicit assumption that the plant is a 10th of a kind fusion power plant. This is in keeping with the DOE guidelines published in the 1970s, the PNL report1, 'Fusion Reactor Design Studies - Standard Accounts for Cost Estimates. This assumption specifically defines the level of the industry and technology maturity and eliminates the need to define the necessary research and development efforts and costs to construct a one of a kind or the first of a kind power plant. It also assumes all the 'teething' problems have been solved and the plant can operate in the manner intended. The plant availability analysis assumes all maintenance actions have been refined and optimized by the operation of the prior nine or so plants. The actions are defined to be as quick and efficient as possible. This study will present a methodology to enable estimation of the availability of the one of a kind (one OAK) plant or first of a kind (1st OAK) plant. To clarify, one of the OAK facilities might be the pilot plant or the demo plant that is prototypical of the next generation power plant, but it is not a full-scale fusion power plant with all fully validated 'mature' subsystems. The first OAK facility is truly the first commercial plant of a common design that represents the next generation plant design. However, its subsystems, maintenance equipment and procedures will continue to be refined to achieve the goals for the 10th OAK power plant.

  9. 12 CFR 627.2725 - Powers and duties of the receiver.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Powers and duties of the receiver. 627.2725 Section 627.2725 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM TITLE IV CONSERVATORS, RECEIVERS, AND VOLUNTARY LIQUIDATIONS Receivers and Receiverships § 627.2725 Powers and duties of...

  10. Power source facility inside of nuclear power plant

    International Nuclear Information System (INIS)

    The present invention simplifies power source facilities inside of a nuclear power plant and enables to provide countermeasures for troubles and inspection of one main transformer during plant operation. Namely, power in the plant is supplied to bus in ordinary use from a main power generator by way of a directly-coupled transformer in the plant during plant operation. Simultaneously, the power inside of the plant is supplied to a bus in non-ordinary use by way of a first communication bus. In this case, an onload tap changer of the direct transformer in the plant controls the voltage on the secondary side of the directly-coupled transformer to a lower level. On the other hand, when a load switcher of the power generator is opened under a predetermined condition, and the main power generator is disconnected from the main transformer and the directly-coupled transformer in the plant, power inside of the plant is supplied to the bus in ordinary use from the secondary side of the main transformer. In this case, the onload tap changer of the main transformer controls the voltage of the secondary side of the main transformer to a higher level. (I.S.)

  11. Feasibility study for the installation of a small hydro electric power plant; Etude de faisabilite. Petite centrale hydro-electrique au lieu dit 'Sous les Roches' a Sonceboz

    Energy Technology Data Exchange (ETDEWEB)

    Tissot, N. [MHyLab, Mini-Hydraulics Laboratory, Montcherand (Switzerland); Hausmann, H. [Hans Hausmann, Bevilard (Switzerland)

    2003-07-01

    This report for the Swiss Federal Office of Energy presents a technical, economical and ecological analysis of the feasibility of a small hydroelectric power plant at Sonceboz, in the Swiss Jura mountains. The power of the planed plant would typically be 500 kW for a water head of about 10 m. The study shows that, compared to one single turbine, a pair of Kaplan type turbines would be operational over a larger range of the river's water flow rate. This solution would be a little bit more costly but offer more flexibility for maintenance. Two maximum water flow rates are considered, 4.5 and 6 m{sup 3}/s respectively. According to the economical study, done with current electric kWh prices, both configurations are viable while the largest flow rate leads to a larger profit. The report is rounded up by a sensitivity analysis considering variations in annual power generation, electro-mechanical and construction cost as well as turbine efficiency. It indicates that this last factor could be crucial for the overall profitability. [French] Ce rapport est le resultat detaille de l'analyse technico-economique et ecologique de faisabilite de la realisation d'une petite centrale hydroelectrique basse chute qui pourrait exploiter une denivellation d'environ 10 m pour une puissance de l'ordre de 500 kW pres de Sonceboz dans le Jura suisse. L'etude montre que le couplage de deux turbines Kaplan offrirait une possibilite de fonctionnement sur une plus grande plage de flux ainsi qu'une plus grande flexibilite de maintenance, ceci pour un cout legerement superieur a l'option a une seule turbine. Les debits de 4.5 et 6 m{sup 3}/s sont consideres. L'etude economique montre que le debit de 6 m{sup 3}/s est plus rentable au prix de vente actuel du kWh. L'article se termine par une analyse de sensibilite sur les incertitudes concernant la production annuelle, les prix de l'electromecanique et du genie civil et le rendement des

  12. Control of power plants and power systems. Proceedings

    International Nuclear Information System (INIS)

    The 88 papers in this volume constitute the proceedings of the International Federation of Automatic Control Symposium held in Mexico in 1995. The broad areas which they cover are: self tuning control; power plant operations; dynamic stability; fuzzy logic applications; power plants modelling; artificial intelligence applications; power plants simulation; voltage control; control of hydro electric units; state estimation; fault diagnosis and monitoring systems; system expansion and operation planning; security assessment; economic dispatch and optimal load flow; adaptive control; distribution; transient stability and preventive control; modelling and control of nuclear plant; knowledge data bases for automatic learning methods applied to power system dynamic security assessment; control of combined cycle units; power control centres. Separate abstracts have been prepared for the three papers relating to nuclear power plants. (UK)

  13. Comparison of large central and small decentralized power generation in India

    Energy Technology Data Exchange (ETDEWEB)

    None

    1997-05-01

    This reports evaluates two options for providing reliable power to rural areas in India. The benefits and costs are compared for biomass based distributed generation (DG) systems versus a 1200-MW central grid coal-fired power plant. The biomass based DG systems are examined both as alternatives to grid extension and as supplements to central grid power. The benefits are divided into three categories: those associated with providing reliable power from any source, those associated specifically with biomass based DG technology, and benefits of a central grid coal plant. The report compares the estimated delivered costs of electricity from the DG systems to those of the central plant. The analysis includes estimates for a central grid coal plant and four potential DG system technologies: Stirling engines, direct-fired combustion turbines, fuel cells, and biomass integrated gasification combined cycles. The report also discusses issues affecting India`s rural electricity demand, including economic development, power reliability, and environmental concerns. The results of the costs of electricity comparison between the biomass DG systems and the coal-fired central grid station demonstrated that the DG technologies may be able to produce very competitively priced electricity by the start of the next century. The use of DG technology may provide a practical means of addressing many rural electricity issues that India will face in the future. Biomass DG technologies in particular offer unique advantages for the environment and for economic development that will make them especially attractive. 58 refs., 31 figs.

  14. Comparison of large central and small decentralized power generation in India

    International Nuclear Information System (INIS)

    This reports evaluates two options for providing reliable power to rural areas in India. The benefits and costs are compared for biomass based distributed generation (DG) systems versus a 1200-MW central grid coal-fired power plant. The biomass based DG systems are examined both as alternatives to grid extension and as supplements to central grid power. The benefits are divided into three categories: those associated with providing reliable power from any source, those associated specifically with biomass based DG technology, and benefits of a central grid coal plant. The report compares the estimated delivered costs of electricity from the DG systems to those of the central plant. The analysis includes estimates for a central grid coal plant and four potential DG system technologies: Stirling engines, direct-fired combustion turbines, fuel cells, and biomass integrated gasification combined cycles. The report also discusses issues affecting India's rural electricity demand, including economic development, power reliability, and environmental concerns. The results of the costs of electricity comparison between the biomass DG systems and the coal-fired central grid station demonstrated that the DG technologies may be able to produce very competitively priced electricity by the start of the next century. The use of DG technology may provide a practical means of addressing many rural electricity issues that India will face in the future. Biomass DG technologies in particular offer unique advantages for the environment and for economic development that will make them especially attractive. 58 refs., 31 figs

  15. Future requirements for fossil power plants

    Directory of Open Access Journals (Sweden)

    Spliethoff H.

    2013-06-01

    Full Text Available The fast increasing installation of technologies to convert renewable energy into power influences the operation of conventional power plants. New requirements on the technology, on the operation and on the economic have to be considered for already running and future power plants. Currently, first experiences with such a production and market situation are available. Technologies are discussed to store power and to reduce CO2 emissions. New compensation models are necessary to enable economic operation of fossil power plants in base load. This article gives a short review about available technologies and future challenges.

  16. Starting of the steam generator of a fossil fuel power plant, using predictive control based in a neuronal model; Arranque del generador de vapor de una central termoelectrica, usando control predictivo basado en un modelo neuronal

    Energy Technology Data Exchange (ETDEWEB)

    Gallardo Dominguez, Tonatiuh

    2004-09-15

    In this thesis work it is presented the design and implementation of a simulator of total scope of a predictive controller based in the neuronal model of the temperature in two stages of the heating of the steam generator of a fossil fuel power plant. An implemented control scheme is detailed, as well as the methodology for the identification of a neuronal model utilized for the control. Finally the results of the implementation in the simulator located at the Instituto de Investigaciones Electricas (IIE) are shown to be satisfactory. This control structure is not applied directly in closed circuit, but provides the value of the control actions to a human operator. [Spanish] En este trabajo de tesis se presenta el diseno e implementacion, en un simulador de alcance total, de un controlador predictivo basado en un modelo neuronal para el control de la temperatura en dos etapas del calentamiento del generador de vapor de una central termoelectrica. Se detalla el esquema de control implementado, asi como la metodologia de identificacion de un modelo neuronal utilizado para la sintesis del control. Finalmente se muestran los resultados de la implementacion en el simulador que se encuentra en el Instituto de Investigaciones Electricas (IIE); dichos resultados fueron satisfactorios. Esta estructura de control no se aplica directamente en lazo cerrado, sino que provee el valor de las acciones de control a un operador humano.

  17. Experimentation of RT-LOTOS for a critical function of a power plant instrumentation and control system; Experimentation de RT-LOTOS pour une fonction critique d`un systeme de controle-commande en centrale

    Energy Technology Data Exchange (ETDEWEB)

    Andriantsiiferana, L.; Courtiat, J.P.; De Oliveira, R.C.

    1996-01-01

    This document is the final report of the contract between LAAS-CNRS and the EdF Direction of Researches and Studies about the experimentation of RT-LOTOS formal description technique on a critical function of a nuclear power plant instrumentation and control system. This report comprises 4 parts: part 1 describes the RT-LOTOS (Real Time-Language of Temporal Ordering Specifications) tutorial and its RTL tool environment, the different RT-LOTOS operators and semantics, and the RTL tool main functionalities; part 2 deals with the methodology and the global architecture for the specification and validation of the CCT (Central Calculator for Treatment); part 3 gives more details about the different processes identified in the specification architecture and presents the main results obtained for the validation of the nominal functioning; part 4 describes some exceptional situations and shows how some failures and their associated recovery mechanisms can be modelled. (J.S.). 6 refs., 53 figs., 5 tabs., 2 appends.

  18. Economy of small-scale power plants

    International Nuclear Information System (INIS)

    The basic requirement for profitable generation of power and heat is sufficient and even heat load. The investment required by a plant based on cogeneration is always higher than that of a plant producing only heat, and hence the full time operation of the plant should be ensured since the beginning of the plant operational age. The second requirement for profitable operation of a small-scale power plant is the homogenous heat and power consumption profiles. Because the plants always cause remarkable capital costs and other fixed costs it is important to make an economic survey of the costs before the decision making in the preliminary planning phase. The presentation gives a review of the factors effecting on the economy of small-scale power plant, the distribution of the costs, and the methods used for investigation of the economy are reviewed

  19. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    The Japan Atomic Industrial Forum (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Developmental trends on nuclear power plants in the world'. In this report, some data at the end of 1999 was made up on bases of answers on questionnaires from 72 electric companies in 31 nations and regions in the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; location of the plants; the plants in the world; and so forth. And, it also has some survey results on the 'Liberalization of electric power markets and nuclear power generation' such as some 70% of respondents in nuclear power for future option, gas-thermal power seen as power source with most to gain from liberalization, merits on nuclear power generation (environmental considerations and supply stability), most commonly voiced concern about new plant orders in poor economy, and so forth. (G.K.)

  20. Alarm-Processing in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Information overload due to the activation of a great number of alarms in a short time is a common problem for the operator in the control room of a industrial plant, mainly in complex process like the nuclear power plants.The problem is the conventional conception of the alarm system, that defines each alarm like a separated and independent entity of the global situation of the plant.A direct consequence is the generation of multiple alarms during a significative disturbance in the process, being most of them redundant and irrelevant to the actual process state wich involves an extra load to the operator, who wastes time in acting selecting the important alarms of the group that appears or lead to a an erroneous action.The present work first describes the techniques developed in the last years to attack the avalanche of alarms problem.Later we present our approach to alarm-processing: an expert system as alarm-filter.Our objective is collect in the system the state of the art in the development of advanced alarm systems, offering an improvement of the information flow to the operators through the suppression of nonsignificant alarms and a structured visualization of the process state.Such support is important during a disturbance for the identification of plant state, diagnosis, consequence prediction and corrective actions.The system is arranged in three stages: alarm-generation, alarm-filter and alarm-presentation.The alarm-generation uses conventional techniques or receives them from an external system.The alarm-filter uses suppression techniques based on: irrelevance analysis with the operation mode and the state of components, causal reasoning and static importance analysis.The alarm presentation is made through a structured way using a priority scheme with three level.The knowledge representation of each alarm is based on frames and a graph of alarms for global knowledge, where the connections between nodes represent causal and irrelevance relations

  1. Survey and analysis of communications problems in nuclear power plants

    International Nuclear Information System (INIS)

    This report presents the results of a Technical Planning Study performed to investigate communications problems in nuclear power plants. Four operating power plants covering a range of reactor types, operating conditions, and operating experience were surveyed by a multidisciplinary research team comprised of human factors, operations, and engineering personnel. Unique data collection technique and procedures were formulated for sampling verbal communications that transpired in the nuclear power plant control room. Methods used to collect data included communications activity sampling, questionnaires, structured observation, noise and light level measurements, and evaluation of communications equipment vendor specifications. Results of the study indicate that current communications systems in nuclear power plants are generally inadequate to handle the functions required of them. Expanded requirements and increased plant staffing above and beyond initial plant designs, along with a lack of integration among the various communications systems, have contributed to the present communications problems. Specific problems identified were that (1) existing systems cannot handle high communications demand due to outmoded or incompatible equipment, (2) communications systems lack centralization, (3) high signal density and multiple messages result in confusion and failure to process signals, (4) noise levels in both the control room and other plant areas reduce speech intelligibility, and (5) communications procedures are not well developed and are not utilized to their best advantage. Recommendations are offered for further investigation of improvements to communications in nuclear power plants

  2. Nuclear Power Plant Lifetime Management Study (I)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Yull; Jeong, Ill Seok; Jang, Chang Heui; Song, Taek Ho; Song, Woo Young [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Jin, Tae Eun [Korea Power Engineering Company Consulting and Architecture Engineers, (Korea, Republic of); Kim, Woo Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-12-31

    As the operation-year of nuclear power plant increases and finding sites for new nuclear power plant becomes harder, a comprehensive and systematic nuclear plant lifetime management(PLIM) program including life extension has to be established for stable and safe supply of electricity. A feasibility study was conducted to systematically evaluate technical, economic and regulatory aspect of plant lifetime managements and plant life extension for Kori-1 nuclear power plant. For technical evaluation of nuclear power plant, 13 major components were selected for lifetime evaluation by screening system. structure, and components(SSCs) of the plant. It was found that except reactor pressure vessel, which needs detailed integrity analysis, and low pressure turbine, which is scheduled to be replaced, 11 out of 13 major components have sufficient service life, for more than 40 years. Because domestic rules and regulations related to license renewal has not yet been written, review on the regulatory aspect of life extensions was conducted using US NRC rules and regulations. A cooperative effort with nuclear regulatory body is needed for early completion of license renewal rules and regulations. For economic evaluation of plant lifetime extension, a computer program was developed and used. It was found that 10 to 20 year of extension operation of Kori-1 nuclear power plant was proved. Based on the results, next phase of plant lifetime management program for detailed lifetime evaluation and presenting detailed implementation schedule for plant refurbishment for lifetime extension should be followed. (author). 74 refs., figs.

  3. Super compacting of drums with dry solid radioactive waste in the nuclear power plant of Laguna Verde;Super compactacion de bidones con desecho radiactivo solido seco en la central nucleo electrica Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez G, R.; Lara H, M. A.; Cabrera Ll, M.; Verdalet de la Torre, O., E-mail: marco.lara@cfe.gob.m [Comision Federal de Electricidad, Central Nucleoelectrica de Laguna Verde, Carretera Nautla-Cardel Km. 42.5, Alto Lucero, Veracruz (Mexico)

    2009-10-15

    The nuclear power plant of Laguna Verde located in the Gulf of Mexico, completes in this 2009, nineteen years to produce by nuclear means 4.78% of the electric power that Mexico requires daily. During this time, the Unit 1 has generated more of 88.85 million mega watt-hour and the Unit 2 more of 69.48 million mega watt-hour with an availability average of 83.55%. Derived of their operation cycles, the nuclear power plant has generated (as any other installation of its type) radioactive wastes of low activity that at the moment are temporarily stored in the site. Due to the life cycle of the nuclear power plant, actually has become necessary to begin a project series focused to continue guaranteeing the storage of these wastes, guarantee that is a license requirement for the operation of this nuclear installation before the National Commission of Nuclear Security and Safeguards. The Federal Commission of Electricity beginning a project that allows continue guaranteeing space of sufficient storage for the wastes that the nuclear power plant of Laguna Verde could generate for the rest of its useful life, this project consisted on a process of physical volume reduction of dry solid radioactive wastes denominated super compacting, it has made possible to reduce the volume that these wastes occupy in the temporary storage noted Dry Solid Radioactive Wastes Deposit located inside the site that occupies the nuclear power plant of Laguna Verde. This work presents the super compacting results, as well as a description of the realization of this task until concluding with the super compacting of 5,854 drums with dry solid radioactive waste of low activity. We will enunciate which were the radiological controls that the Department of Radiological Protection of the nuclear power plant of Laguna Verde applied to this work that was realized for first time in Mexico and the nuclear power plant. (Author)

  4. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1999 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1999; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; grid connection forecasts; world electric power market; electronuclear owners and share holders in EU, capacity and load factor; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; 1999 gross load factor by operator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  5. Nuclear Power Plant Module, NPP-1: Nuclear Power Cost Analysis.

    Science.gov (United States)

    Whitelaw, Robert L.

    The purpose of the Nuclear Power Plant Modules, NPP-1, is to determine the total cost of electricity from a nuclear power plant in terms of all the components contributing to cost. The plan of analysis is in five parts: (1) general formulation of the cost equation; (2) capital cost and fixed charges thereon; (3) operational cost for labor,…

  6. Maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    Maintenance action of nuclear power plant (NPP) was described. Maintenance of NPP aimed at assurance of required function of NPP's equipment so as to prevent release of radioactive materials into the environment as well as attainment of stable operation of NPP. Philosophy of NPP safety was based on defense-in-depth or multiple barriers requiring specified function for the equipment. Preventive maintenance was essential to NPP's equipment and the scope of maintenance was decided on priority with adequate method and frequency of inspection. Most inspection was conducted during periodic inspection at outage. Repair or improvement works were performed if needed. Periodic inspection period was very long and then capacity factor of NPP was low in Japan compared with foreign data although frequency of unscheduled shutdown was very low. Introduction of reability- centered maintenance was requested based on past experiences of overhaul inspection. Technical evaluation of aged NPP had been conducted on aging phenomena and promotion of advanced maintenance was more needed. (T. Tanaka)

  7. Citizens contra nuclear power plants

    International Nuclear Information System (INIS)

    Is Wyhl the beginning of a new citizens' movement against official policies concerning atomic energy or is it the end of citizens' initiatives of latter years. Did democracy pass its test in Wyhl, or was the state's authority undermined. The danger of atomic energy was not the only concern of the citizens of the Rhine valley who demonstrated against the planned nuclear power plant, but also the quality of industrial and energy planning in which the democratic foundations have to be safeguarded. In the meantime, the doubts increase that this source of energy is of a not dangerous nature, and the myth of supposedly cheap atomic energy has been scattered. The dangers in connection with waste transport and storage were made public beyond the boundaries of the places in question, in particular as a result of the demonstrations. The publication documents the course of the demonstration and the site occupation from the beginning of Febuary 1975 onwards. The occupation still continued when the booklet was published despite the decision of the Administrative Court in Freiburg at the end of March (prohibition of commencement of building until the verdict on the principal suit against the overall project has been reached, the final decision to be made by the Higher Administrative Court in Mannheim). The author aims at describing the new quality of citizens' commitments in this booklet. (orig./LN)

  8. Techniques to Measure Solar Flux Density Distribution on Large-Scale Receivers

    OpenAIRE

    Röger, Marc; Herrmann, Patrik; Ulmer, Steffen; Ebert, Miriam; Prahl, Christoph; Göhring, Felix

    2014-01-01

    Flux density measurement applied to central receiver ystems delivers the spatial distribution of the concentrated solar radiation on the receiver aperture, measures receiver input power, and monitors and might control heliostat aimpoints. Commercial solar tower plants have much larger aperture surfaces than the receiver prototypes tested in earlier research and development (R&D) projects. Existing methods to measure the solar flux density in the receiver aperture face new challenges reg...

  9. Power plant systems for fusion reactors

    International Nuclear Information System (INIS)

    To investigate and compare the applicability of thermal cycles for power generation to nuclear fusion, four plant systems, i.e. direct steam turbine, in-direct steam turbine, direct gas turbine and in-direct steam turbine with gas-cooled blanket, have been designed with the estimates of their thermal efficiencies. An plant designs here are based on the same power core: fusion power 2300 MW, external heating power 58 MW, thermal power of blanket 2420 MW and divertor 490 MW. In addition, it is assumed that the construction of the power plant is near future so that the structural material would be a ferritic/martensitic steel such as F82H to be used at temperatures lower than 500-550degC. Also the divertor is always cooled by water at pressure of 10 MPa, and inlet/outlet temperature of 150-200degC/200-250degC. The removal heat from the divertor is utilized to heat the coolant fed to the blanket inlet in all above plants. The direct steam turbine cycle employs supercritical pressure water at 25 MPa and blanket inlet/outlet temperatures of 280degC/500degC. The steam out from the blanket directly flows into a high pressure turbine. The steam intermediately extracted from the high pressure turbine and/or a part of main steam from the blanket outlet is utilized to reheat the steam coming out of the high pressure turbine. Also the regenerative cycle is applied by using steams extracted from high, medium and low pressure turbines. Eventually the obtained thermal efficiency is 41.4%. The in-direct steam turbine cycle consists of the primary loop which removes the heat from the blanket and the secondary (power generation) loop by using a steam generator at their interface. The primary coolant is supercritical pressure water similar to that of above direct steam cycle, i.e. 25 MPa, 290degC/510degC. The secondary coolant is also water but with the condition of a fast breeder fission reactor, i.e. 16.3 MPa, 210degC/480degC. With reheat and regenerative cycle, the thermal

  10. Results of molten salt panel and component experiments for solar central receivers: Cold fill, freeze/thaw, thermal cycling and shock, and instrumentation tests

    Energy Technology Data Exchange (ETDEWEB)

    Pacheco, J.E.; Ralph, M.E.; Chavez, J.M.; Dunkin, S.R.; Rush, E.E.; Ghanbari, C.M.; Matthews, M.W.

    1995-01-01

    Experiments have been conducted with a molten salt loop at Sandia National Laboratories in Albuquerque, NM to resolve issues associated with the operation of the 10MW{sub e} Solar Two Central Receiver Power Plant located near Barstow, CA. The salt loop contained two receiver panels, components such as flanges and a check valve, vortex shedding and ultrasonic flow meters, and an impedance pressure transducer. Tests were conducted on procedures for filling and thawing a panel, and assessing components and instrumentation in a molten salt environment. Four categories of experiments were conducted: (1) cold filling procedures, (2) freeze/thaw procedures, (3) component tests, and (4) instrumentation tests. Cold-panel and -piping fill experiments are described, in which the panels and piping were preheated to temperatures below the salt freezing point prior to initiating flow, to determine the feasibility of cold filling the receiver and piping. The transient thermal response was measured, and heat transfer coefficients and transient stresses were calculated from the data. Freeze/thaw experiments were conducted with the panels, in which the salt was intentionally allowed to freeze in the receiver tubes, then thawed with heliostat beams. Slow thermal cycling tests were conducted to measure both how well various designs of flanges (e.g., tapered flanges or clamp type flanges) hold a seal under thermal conditions typical of nightly shut down, and the practicality of using these flanges on high maintenance components. In addition, the flanges were thermally shocked to simulate cold starting the system. Instrumentation such as vortex shedding and ultrasonic flow meters were tested alongside each other, and compared with flow measurements from calibration tanks in the flow loop.

  11. Analysis of color environment in nuclear power plants

    International Nuclear Information System (INIS)

    This article reports the results of color and psychological analysis of the outlook of nuclear power plants and the visual environments inside of the plants. Study one was the color measurements of the outlook of nuclear plants and the visual environment inside of the plants. Study two was a survey of the impressions on the visual environments of nuclear plants obtained from observers and interviews of the workers. Through these analysis, we have identified the present state of, and the problems of the color environments of the nuclear plants. In the next step, we have designed the color environments of inside and outside of the nuclear plants which we would recommend (inside designs were about fuel handling room, operation floor of turbine building, observers' pathways, central control room, rest room for the operators). Study three was the survey about impressions on our design inside and outside of the nuclear plants. Nuclear plant observers, residents in Osaka city, residents near the nuclear plants, the operators, employees of subsidiary company and the PR center guides rated their impressions on the designs. Study four was the survey about the design of the rest room for the operators controlling the plants. From the results of four studies, we have proposed some guidelines and problems about the future planning about the visual environments of nuclear power plants. (author)

  12. Thermal power plant simulation and control

    CERN Document Server

    Flynn, Damian

    2013-01-01

    Contributors of world-class excellence are brought together in Thermal Power Plant Simulation and Control to illustrate how current areas of research can be applied to power plant operation, leading to enhanced unit performance, asset management andplant competitiveness through intelligent monitoring and control strategies.

  13. Quality assurance in nuclear power plant

    International Nuclear Information System (INIS)

    The factors related to the licensing procedures of a nuclear power plant (quality assurance and safety analysis) are presented and discussed. The consequences of inadequate attitudes towards these factors are shown and suggestions to assure the safety of nuclear power plants in Brazil are presented. (E.G.)

  14. Lessons learned from existing biomass power plants

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, G.

    2000-02-24

    This report includes summary information on 20 biomass power plants, which represent some of the leaders in the industry. In each category an effort is made to identify plants that illustrate particular points. The project experiences described capture some important lessons learned that lead in the direction of an improved biomass power industry.

  15. Slovak Electric, plc, Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    In this popular scientific brochure a brief description of construction scheme of Bohunice Nuclear Power Plant is presented. Electricity generation in a nuclear power plant is described. Instrumentation and control system as well as nuclear safety principles applied on the NPP are presented

  16. Working in a virtual power plant

    International Nuclear Information System (INIS)

    Graphical simulations on computer providing a virtual and reversible experience can now be used for maintenance in nuclear power plants allowing operations to be tested and tools to be optimised. Eventually, operatives will be trained to work in virtual nuclear power plants in complete safety. (authors)

  17. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    In the third quarter of 1993, all of Finland's four nuclear power plant units were in power operation, with the exception of the annual maintenance outages of the Loviisa units. The load factor average of the plant units was 83.6 %. None of the events which occurred during this annual quarter had any bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  18. Nuclear power plants for protecting the atmosphere

    International Nuclear Information System (INIS)

    Some figures are presented comparing date on the CO2 emission and oxygen consumption of nuclear, natural gas fired, advanced coal fired and oil fired power plants, for the same amounts of electricity generated. The data were deduced from the Paks Nuclear Power Plant, Hungary. (R.P.)

  19. Nuclear power plant risk management

    International Nuclear Information System (INIS)

    This book collects papers on nuclear plant risk management. Topics include: basic concepts in risk analysis and decision theory; establishing integrated plant models; core and containment response; and site modeling and consequences

  20. Super-simulator for nuclear power plant

    International Nuclear Information System (INIS)

    The super-simulator is a conceptual name for future innovative simulators of nuclear power plants which surpass, to a large extent, the capabilities and performances of existing nuclear power plant simulators for operator training, plant analyzers for engineering studies or computer codes for dynamics analysis. Such super-simulators will be realized by employing highly advanced methods of mathematical modeling of the physical chemical and other related processes in the nuclear power plants and innovative methods of numerical computation using rapidly evolving high performance computing systems. (author)

  1. Harmonics in a Wind Power Plant: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Preciado, V.; Madrigal, M.; Muljadi, E.; Gevorgian, V.

    2015-04-02

    Wind power generation has been growing at a very fast pace for the past decade, and its influence and impact on the electric power grid is significant. As in a conventional power plant, a wind power plant (WPP) must ensure that the quality of the power being delivered to the grid is excellent. At the same time, the wind turbine should be able to operate immune to small disturbances coming from the grid. Harmonics are one of the more common power quality issues presented by large WPPs because of the high switching frequency of the power converters and the possible nonlinear behavior from electric machines (generator, transformer, reactors) within a power plant. This paper presents a summary of the most important issues related to harmonics in WPPs and discusses practical experiences with actual Type 1 and Type 3 wind turbines in two WPPs.

  2. Hydraulic Power Plant Machine Dynamic Diagnosis

    Directory of Open Access Journals (Sweden)

    Hans Günther Poll

    2006-01-01

    Full Text Available A method how to perform an entire structural and hydraulic diagnosis of prototype Francis power machines is presented and discussed in this report. Machine diagnosis of Francis units consists on a proper evaluation of acquired mechanical, thermal and hydraulic data obtained in different operating conditions of several rotary and non rotary machine components. Many different physical quantities of a Francis machine such as pressure, strains, vibration related data, water flow, air flow, position of regulating devices and displacements are measured in a synchronized way so that a relation of cause an effect can be developed for each operating condition and help one to understand all phenomena that are involved with such kind of machine. This amount of data needs to be adequately post processed in order to allow correct interpretation of the machine dynamics and finally these data must be compared with the expected calculated data not only to fine tuning the calculation methods but also to accomplish fully understanding of the influence of the water passages on such machines. The way how the power plant owner has to operate its Francis machines, many times also determined by a central dispatcher, has a high influence on the fatigue life time of the machine components. The diagnostic method presented in this report helps one to understand the importance of adequate operation to allow a low maintenance cost for the entire power plant. The method how to acquire these quantities is discussed in details together with the importance of correct sensor balancing, calibration and adequate correlation with the physical quantities. Typical results of the dynamic machine behavior, with adequate interpretation, obtained in recent measurement campaigns of some important hydraulic turbines were presented. The paper highlights the investigation focus of the hydraulic machine behavior and how to tailor the measurement strategy to accomplish all goals. Finally some

  3. Performance and Loading of Domestic Wastewater Treatment Plants Receiving Aquaculture Processing Effluent.

    OpenAIRE

    GOVERE; SIMBARASHE; MAHLATINI PRECIOUS; NDABANINGI ANGELINE

    2011-01-01

    This study dealt with the loading and performance of a domestic wastewater treatment plant when receiving combined influent from an aquaculture processing factory and an urban settlement in Kariba town, Zimbabwe. The methodological framework was a case study approach involving a local aquaculture factory and two treatment plants. In the study effluent from Nyamhunga treatment plant, which receives both domestic and aquaculture effluent, acted as the treatment. Effluent from a similarsized pla...

  4. Hybrid wind-power-distillation plant

    Directory of Open Access Journals (Sweden)

    Ninić Neven

    2012-01-01

    Full Text Available This paper reports and elaborates on the idea of a solar distiller and an offshore wind power plant operating together. The subject under discussion is a single-stage solar distillation plant with vaporization, using adiabatic expansion in the gravitational field inside a wind power plant supporting column. This scheme divides investment costs for electric power and distillate production. In the region of the Adriatic Sea, all electric power produced could be “converted” to hydrogen using less than 10% of the distillate produced.

  5. Voltage Control in Wind Power Plants with Doubly Fed Generators

    DEFF Research Database (Denmark)

    Garcia, Jorge Martinez

    In this work, the process of designing a wind power plant composed of; doubly fed induction generators, a static compensator unit, mechanically switched capacitors and on-load tap changer, for voltage control is shown. The selected control structure is based on a decentralized system, since it...... supplied by the doubly fed induction generator wind turbines is overcome by installing a reactive power compensator, i.e. a static compensator unit, which is coordinated with the plant control by a specific dispatcher. This dispatcher is set according to the result of the wind power plant load flow. To...... offers very fast system response to grid disturbances and lower sensitivity to the grid impedance, and moreover, this control structure releases the central control of having grid impedance estimation techniques or adaptive control methods. The difference between the required reactive power and the one...

  6. Continental Airlines Receives J.D. Power and Associates Award

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ On June 29, 2006, Continental Airlines (NYSE: CAL) was ranked the highest in Customer Satisfaction Among Traditional Network Carriers in North America in the J.D.Power and Associates 2006 Airline Satisfaction Index StudySM.

  7. Human factors in nuclear power plant operations

    International Nuclear Information System (INIS)

    This report describes some of the human factors problems in nuclear power plants and the technology that can be employed to reduce those problems. Many of the changes to improve the human factors in existing plants are inexpensive, and the expected gain in human reliability is substantial. The human factors technology is well-established and there are practitioners in most countries that have nuclear power plants

  8. Human factors in nuclear power plants

    International Nuclear Information System (INIS)

    This report describes some of the human factors problems in nuclear power plants and the technology that can be employed to reduce those problems. Many of the changes to improve the human factors in existing plants are inexpensive, and the expected gain in human reliability is substantial. The human factors technology is well-established and there are practitioners in most countries that have nuclear power plants. (orig.)

  9. Safety culture in nuclear power plants

    International Nuclear Information System (INIS)

    Experience shows that German nuclear power plants have always been operated reliably and safely. Over the years, the safety level in these plants has been raised considerably so that they can stand any comparison with other countries. This is confirmed by the two reports published by the Federal Ministry for the Environment on the nuclear safety convention. Behind this, there must obviously stand countless appropriate 'good practices' and a safety management system in nuclear power plants. (orig.)

  10. Linguistic control of a nuclear power plant

    International Nuclear Information System (INIS)

    A multivariable linguistic controller based on fuzzy set theory is discussed and its application to a pressurized water nuclear power plant control is illustrated by computer simulation. The nonlinear power plant simulation model has nine states, two control inputs, one disturbance input, and two outputs. Although relatively simple, the model captures the essential coupled nonlinear plant dynamics and is convenient to use for control system studies. The use of an adaptive version of the controller is also demonstrated by computer simulation

  11. Program increasing of nuclear power plant safeness

    International Nuclear Information System (INIS)

    The results achieved within the project of national task 'Program increasing of nuclear power plant safeness' are presented in the document. The project was aimed to extend and deepen activities relating to safety increase of nuclear power units WWER-440 which play significant part in electricity production in the Slovak Republic. The application of advanced foreign calculating programs and calculation of radionuclide spreading in environment and techniques will influence the increase of extent, quality and international acceptance of safety analysis of nuclear power plant blocks WWER-440 and the risk valuation from operating nuclear power plants. Methodic resources for coping in emergency situation in nuclear energetics will be used for support in decision making in real time during radiation emergency on nuclear plant, region and state level. A long-term strategy in dealing with burnt fuel and radioactive substance formatting during nuclear power plant liquidation particularly with waste which is un acceptable in regional dump, has developed into a theoretical and practical preparation of solvable group for operating the converting centre Bohunice and in inactivating the nuclear power plant A-1. The diagnostic activities in nuclear power plants in the Slovak Republic have been elaborated into a project of norm documents in accordance with international norms for diagnostic systems. Presentation of new technologies and materials for repairs and reconstructions of components and nuclear power plant knots qualify increase in their reliability, safety and life. New objective methods and criterions for valuation and monitoring of the residual life and safety of fixed nuclear power plants. Results of problem solving linked with connecting the blocks of nuclear power plants to frequency regulation in electric network in the Slovak Republic are also presented in the document

  12. Safety and Radiation Protection at Swedish Nuclear Power Plants 2004

    International Nuclear Information System (INIS)

    higher inspector presence than normal and more stringent reporting requirements. In SKI's opinion, Barsebaeck Kraft AB (BKAB), with the measures that have been implemented, is maintaining safety at the Barsebaeck nuclear power plant. In December, Studsvik Nuclear AB decided to close down the two reactors at Studsvik. Therefore, SKI immediately initiated an intensified supervision of the decommissioning process at the reactors. The handling of nuclear waste at nuclear power plants, including the operation of the Repository for Low and Intermediate-level Operational Waste (SFR-1) and the Central Interim Storage Facility for Spent Nuclear Fuel (CLAB) has largely functioned well for the most part. In 2004, the total radiation dose to the personnel at nuclear power plants was 6.4 manSv, which is lower than in 2003. The average value for the past five years is 9 manSv. The shutdown periods were shorter at a few reactors due to the fact that work progress surpassed expectations. Technical problems and unplanned repair work resulted in a somewhat higher dose than expected at a few reactors. No individual received a radiation dose greater than 20 mSv. The fuel defects that occurred in 2004 did not result in any significant impact on radiation protection. The dose to people living in the vicinity of the nuclear power plants in 2004 was below 1 per cent of the permitted dose. The control measurements that SSI conducts on environmental samples around nuclear power plants and on the radioactive releases to water show a good agreement with the licensees' own measurements

  13. Financing alternatives and incentives for solar-thermal central-receiver systems

    Energy Technology Data Exchange (ETDEWEB)

    Bos, P.B.

    1982-07-01

    As a result of various recently enacted incentive and regulatory legislation combined with the new administration policy and budgetary guidelines, the commercialization of solar thermal central receiver systems will involve financing alternatives other than conventional utility financing. This study was conducted to identify these potential financing alternatives and the associated requirements and impacts on the Department of Energy program. Based upon this analysis, it is concluded that the current alternative financing window is extremely short (through 1985), and that an extension or at the least a gradual phasing out, of the solar tax credits is necessary for the successful transfer of the central receiver technology to the private sector. Furthermore, throughout this time period, continued government support of the R and D activities is necessary to provide the necessary confidence in this technology for the private (financial) sector to underwrite this technology transfer. Consequently, even though the central receiver technology shows high promise for replacing a significant fraction of the oil/gas-fired utility industry peaking and intermediate generation, the current readiness status of this technology still requires further direct and indirect government support for a successful technology transfer. The direct government research and development support will provide the basis for a technological readiness and confidence, whereas the indirect tax incentive support serves to underwrite the extraordinary risks associated with the technology transfer. These support requirements need only be limited to and decreasing during this technology transfer phase, since as the systems approach successful full-scale commercialization, the extraordinary risks will be gradually eliminated. At the time of commercialization the system's value should be on a par with the installed system's cost.

  14. Plant life management and maintenance technologies for nuclear power plants

    International Nuclear Information System (INIS)

    Nuclear power generation occupying an important position for energy source in Japan and supplying about one third of total electric power usage is now required for further upgrading of its economics under regulation relaxation of electric power business. And, under execution retardation of its new planning plant, it becomes important to operate the already established plants for longer term and to secure their stability. Therefore, technical development in response to the plant life elongation is promoted under cooperation of the Ministry of Economics and Industries, electric power companies, literate, and plant manufacturers. Under such conditions, the Hitachi, Ltd. has progressed some technical developments on check inspection, repairs and maintenance for succession of the already established nuclear power plants for longer term under securing of their safety and reliability. And in future, by proposing the check inspection and maintenance program combined with these technologies, it is planned to exert promotion of maintenance program with minimum total cost from a viewpoint of its plant life. Here were described on technologies exerted in the Hitachi, Ltd. such as construction of plant maintenance program in response to plant life elongation agreeing with actual condition of each plant, yearly change mechanism grasping, life evaluation on instruments and materials necessary for maintenance, adequate check inspection, repairs and exchange, and so forth. (G.K.)

  15. Model Predictive Control of Integrated Gasification Combined Cycle Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    B. Wayne Bequette; Priyadarshi Mahapatra

    2010-08-31

    The primary project objectives were to understand how the process design of an integrated gasification combined cycle (IGCC) power plant affects the dynamic operability and controllability of the process. Steady-state and dynamic simulation models were developed to predict the process behavior during typical transients that occur in plant operation. Advanced control strategies were developed to improve the ability of the process to follow changes in the power load demand, and to improve performance during transitions between power levels. Another objective of the proposed work was to educate graduate and undergraduate students in the application of process systems and control to coal technology. Educational materials were developed for use in engineering courses to further broaden this exposure to many students. ASPENTECH software was used to perform steady-state and dynamic simulations of an IGCC power plant. Linear systems analysis techniques were used to assess the steady-state and dynamic operability of the power plant under various plant operating conditions. Model predictive control (MPC) strategies were developed to improve the dynamic operation of the power plants. MATLAB and SIMULINK software were used for systems analysis and control system design, and the SIMULINK functionality in ASPEN DYNAMICS was used to test the control strategies on the simulated process. Project funds were used to support a Ph.D. student to receive education and training in coal technology and the application of modeling and simulation techniques.

  16. Nuclear power plant after Fukushima incident: Lessons from Japan to Thailand for choosing power plant options

    OpenAIRE

    Tatcha Sudtasan; Komsan Suriya

    2012-01-01

    This study evaluates four power plant options in Thailand to suggest whether the country should adopt nuclear power plants. It includes a scenario that nuclear power plants are forced to be shut because of natural disaster like what happened at Fukushima Daiishi nuclear power plant in Japan. The results found that, in terms of net present value both in duration of 30 and 50 years, nuclear power plants is the best choice under certainty of no severe natural disaster that would interrupt the op...

  17. Localization of nuclear power plant technology

    International Nuclear Information System (INIS)

    Asia, and particularly China, has an enormous need for power and must deal with the practicalities of building large base load units. In China, as in other countries, there are limitations on the use of large quantities of fossil fuel. This raises the possibility of turning to nuclear power to satisfy their energy needs. Other issues tend to point to the nuclear option for these growing economies, including economic considerations, environmental concerns, energy independence and raising the technological capabilities of the country. When a country embarks on a nuclear power program with the intention of localizing the technology, a long-term commitment is necessary to achieve this objective. Localization of nuclear technology is not a new phenomenon. The nature of the industry from the early beginnings has always involved transfer of technology when a new country initiated a nuclear power construction program. In fact, most previous experiences with this localization process involved heavy governmental, political and financial support to drive the success of the program. Because of this strong governmental support, only the receiving nation's companies were generally allowed to participate in the local business operations of the technology recipient. What is new and different today is the retreat from heavy financial support by the receiving country's government. This change has created a strong emphasis on cost-effectiveness in the technology transfer process and opportunities for foreign companies to participate in local business activities. ABB is a world-wide company with two parent companies that have been very active over many years in establishing cost-justified local operations throughout the world. Today, ABB has become the largest electrical engineering company in the world with respected local operations in nearly every country. Lessons learned by ABB in their world-wide localization initiatives are being applied to the challenge of cost

  18. Operating experience with nuclear power plants 2013

    International Nuclear Information System (INIS)

    The VGB Technical Committee 'Nuclear Plant Operation' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2013, events important to plant safety, special and relevant repair, and retrofit measures from Belgium, Germany, Finland, the Netherlands, Switzerland, and Spain. (orig.)

  19. Reliability of emergency ac power systems at nuclear power plants

    International Nuclear Information System (INIS)

    Reliability of emergency onsite ac power systems at nuclear power plants has been questioned within the Nuclear Regulatory Commission (NRC) because of the number of diesel generator failures reported by nuclear plant licensees and the reactor core damage that could result from diesel failure during an emergency. This report contains the results of a reliability analysis of the onsite ac power system, and it uses the results of a separate analysis of offsite power systems to calculate the expected frequency of station blackout. Included is a design and operating experience review. Eighteen plants representative of typical onsite ac power systems and ten generic designs were selected to be modeled by fault trees. Operating experience data were collected from the NRC files and from nuclear plant licensee responses to a questionnaire sent out for this project

  20. Transient analysis models for nuclear power plants

    International Nuclear Information System (INIS)

    The modelling used for the simulation of the Angra-1 start-up reactor tests, using the RETRAN computer code is presented. Three tests are simulated: a)nuclear power plant trip from 100% of power; b)great power excursions tests and c)'load swing' tests.(E.G.)