WorldWideScience

Sample records for carolina project design

  1. CREEK Project's Phytoplankton Pigment Monitoring Database for Eight Creeks in the North Inlet Estuary, South Carolina: 1997-1999

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — The CREEK Project began in January of 1996 and was designed to help determine the role of oysters, Crassostrea virginica, in tidal creeks of the North Inlet...

  2. Status of the North Carolina/Southeast Compact low-level radioactive waste disposal project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, C.K. [North Carolina Low-Level Radioactive Waste Management Authority, NC (United States)

    1993-03-01

    The Southeast Compact is a sited region for low-level radioactive waste because of the current facility at Barnwell, South Carolina. North Carolina has been designated as the next host state for the compact, and the North Carolina Low-Level Radioactive Waste Management Authority is the agency charged with developing the new facility. Chem-Nuclear Systems, Inc., has been selected by the Authority as its primary site development and operations contractor. This paper will describe the progress currently being made toward the successful opening of the facility in January 1996. The areas to be addressed include site characterization, performance assessment, facility design, public outreach, litigation, finances, and the continued operation of the Barnwell facility.

  3. Design Theory Projectability

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Baskerville, Richard

    2014-01-01

    Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  4. The Carolina Bay Restoration Project - Final Report 2000-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Barton, Christopher

    2007-12-15

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report.

  5. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob;

    1997-01-01

    , and various related task spaces, domain activities, decision-making activities, division and coordination of work, and social organization. The framework is the result of a generalization of experiences from field studies in and design of support systems for a variety of modern work domains, such as process......It is widely recognized that the increasingly dynamic and competitive business environment requires the exploration and integration of specialized knowledge from different domains in order to create innovative and competitive artefacts and reduce design and development costs. This paper presents...... the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process...

  6. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  7. CREEK Project's Oyster Biomass Database for Eight Creeks in the North Inlet Estuary, South Carolina

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — A group of eight tidal creeks dominated by oysters, Crassostrea virginica, in North Inlet Estuary, South Carolina, USA were studied using a replicated BACI (Before...

  8. Nuclear Magnetic Resonance Project at the Medical University of South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, Eric R.

    2008-04-25

    Department of Energy funds were used to support the development of a Center for Marine Structural Biology at the Marine Resources Center at Ft. Johnson in Charleston, South Carolina. The Ft. Johnson site is home to five institutions in a unique state/federal/academic partnership whose member institutions include the National Ocean Service (NOS), the National Institute of Standards and Technology (NIST), the Medical University of South Carolina (MUSC), the SC Department of Natural Resources, and the College of Charleston. The Center for Marine Structural Biology sits adjacent to the newly completed Hollings Marine Laboratory and houses a 700 and 800 MHz nuclear magnetic resource instruments. The completed center is operational and meets it goal to provide state-of-the-art nuclear magnetic resonance capabilities to resolve the molecular structures of compounds that have direct relevance to human health, including marine-derived biotoxins that are tested against cancer cell lines through collaborative studies with researchers at the Hollings Cancer Center at MUSC. Funds from the DOE assisted, in part, with the purchase of NMR probes and ancillary equipment for the 800 MHz NMR instrument. In addition, developmental funds was used to support the visit of an Scientific Advisory Board and for the NMR Planning Team to visit currently operational high field NMR facilities to guide their choice of instrumentation and design of the building.

  9. Designing job enrichment projects.

    Science.gov (United States)

    Clakeley, G L

    1988-01-01

    This paper describes a management strategy for a job satisfaction program utilized in a large occupational therapy department. The goal of the program is to retain satisfied, productive employees and reduce attrition of therapists and assistants. The use of job enrichment projects for occupational therapy assistants will be presented with brief descriptions of two projects. PMID:23944880

  10. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  11. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  12. Project X: Accelerator Reference Design

    CERN Document Server

    Holmes, S D; Chase, B; Gollwitzer, K; Johnson, D; Kaducak, M; Klebaner, A; Kourbanis, I; Lebedev, V; Leveling, A; Li, D; Nagaitsev, S; Ostroumov, P; Pasquinelli, R; Patrick, J; Prost, L; Scarpine, V; Shemyakin, A; Solyak, N; Steimel, J; Yakovlev, V; Zwaska, R

    2013-01-01

    Part 1 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". Part 1 contains the volume Preface and a description of the conceptual design for a high-intensity proton accelerator facility being developed to support a world-leading program of Intensity Frontier physics over the next two decades at Fermilab. Subjects covered include performance goals, the accelerator physics design, and the technological basis for such a facility.

  13. The Regional Marine Science Project of the Carteret County, North Carolina, Public Schools. Experiments in the Use of Field Ecology as an Approach to Understanding Coastal Environments.

    Science.gov (United States)

    Hon, Will

    The development of the Regional Marine Science Project in Carteret County, North Carolina, is portrayed in this booklet. Established with Elementary and Secondary Education Act (ESEA) Title III funds in 1966, the project has evolved from one high school course in marine ecology to numerous courses and activities at all levels, primary through…

  14. Evaluating seismology-based curriculum for use in high school physical science and physics classes as a part of the South Carolina Earth Physics Project (SCEPP)

    Science.gov (United States)

    Bartholomew, James Walter, Jr.

    The South Carolina Earth Physics Project (SCEPP) has created a set of Inquiry-based learning modules utilizing the Learning Cycle Method of instruction. In addition software entitled the Global Earthquake Explorer (GEE) has been developed for use with the modules and as a tool to explore worldwide seismic activity. Modules are intended for use in either high school 9th grade physical science or 12th grade physics classes. The modules integrate wave phenomenon concepts normally taught in a physical science class with concepts and real world examples from seismology. The modules created make use of a statewide seismic network and the advance GEE software in order to allow students to access actual seismic data in near real time. Teachers from across the state reviewed the modules as apart of a professional development program and through a focus group discussion. Teachers see SCEPP as a valuable resource that effectively engages students in science, requires the student to use skills from several disciplines simultaneously, and helps students understand the interdisciplinary nature of science. The modules and associated software were subjected to rigorous field-testing in science classes across South Carolina. Studies conducted in 2001 and 2002 utilizing a pre-test, post-test design showed that students were able to use the modules and GEE effectively. A third study was conducted in 2003 that utilized both a treatment and control group in its design. This study was an attempt to quantify the amount of cognitive subject matter gain and any attitude changes in students toward science from exposure to the SCEPP materials but was not successful. Improper implementation of the modules appeared to have negated any positive effects SCEPP had with students. The project was able to gain valuable information for how to properly implement the modules with implications for how science may be better taught in K--12 schools.

  15. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming...

  16. Educación Compensatoria. Aprendizaje temprano, éxito posterior (II: Carolina Abecedarian Project) . [Compensatory education. Early learning, later success (II: Carolina Abecedarian Project)

    OpenAIRE

    Eduardo López López

    2007-01-01

    This is a review study which analyzes research that evaluates the long term effects of an early education program, the Abecedarian Project. The Abecedarian Project (ABC) is a preventive compensatory education program for children from 0 to 5 years of high risk mothers. The experimental group (E) received an intensive preschool treatment, while the control (C) group did not. At five years old, each group was divided into another two groups: Two of these new groups (EE and CE) received intensi...

  17. CREEK Project's Microzooplankton Seasonal Monitoring Database for Eight Creeks in the North Inlet Estuary, South Carolina: 1997-1999

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — A group of eight intertidal creeks with high densities of oysters, Crassostrea virginica, in North Inlet Estuary, South Carolina, USA were studied using a...

  18. CREEK Project's Nekton Database for Eight Creeks in the North Inlet Estuary, South Carolina: 1997-1998.

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — A group of eight intertidal creeks with high densities of oysters, Crassostrea virginica, in North Inlet Estuary, South Carolina, USA were studied using a...

  19. CREEK Project's Internal Creek Habitat Survey for Eight Creeks in the North Inlet Estuary, South Carolina: January 1998.

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — A group of eight intertidal creeks with high densities of oysters, Crassostrea virginica, in North Inlet Estuary, South Carolina, USA were studied using a...

  20. Plants that Bite Back. Carolina Beach State Park: An Environmental Education Learning Experience Designed for the Middle Grades.

    Science.gov (United States)

    Wahab, Phoebe

    This learning packet, one in a series of eight, was developed by the Carolina Beach State Park in North Carolina for the middle grades to teach about carnivorous plants. Loose-leaf pages are presented in 10 sections that contain: (1) introductions to the North Carolina State Park System, the Carolina Beach State Park, the park's activity packet,…

  1. Information Flows in Networked Engineering Design Projects

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Maier, Anja

    Complex engineering design projects need to manage simultaneously multiple information flows across design activities associated with different areas of the design process. Previous research on this area has mostly focused on either analysing the “required information flows” through activity...... information flows between design spaces, and to assess the influence that these misalignments could have on the performance of engineering design projects....

  2. Project Portfolio Management Prototype Application Design

    OpenAIRE

    Paul POCATILU

    2007-01-01

    The management of project portfolio in a company requires the use of specific software, especially when the number of projects is significant. This paper is based on the Methodology for the development of IT projects portfolio management applications research project. This paper presents some of the results of a project portfolio application design.

  3. Benefits of Co-design in Service Design Projects

    NARCIS (Netherlands)

    Steen, M.G.D.; Manschot, M.; Koning, N. de

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and realisticall

  4. Benefits of co-design in service design projects

    NARCIS (Netherlands)

    Steen, M.; Manschot, M.A.J.; De Koning, N.

    2011-01-01

    In many service design projects, co-design is seen as critical to success and a range of benefits are attributed to co-design. In this paper, we present an overview of benefits of co-design in service design projects, in order to help the people involved to articulate more precisely and realisticall

  5. Educación Compensatoria. Aprendizaje temprano, éxito posterior (II: Carolina Abecedarian Project . [Compensatory education. Early learning, later success (II: Carolina Abecedarian Project

    Directory of Open Access Journals (Sweden)

    Eduardo López López

    2007-01-01

    Full Text Available This is a review study which analyzes research that evaluates the long term effects of an early education program, the Abecedarian Project. The Abecedarian Project (ABC is a preventive compensatory education program for children from 0 to 5 years of high risk mothers. The experimental group (E received an intensive preschool treatment, while the control (C group did not. At five years old, each group was divided into another two groups: Two of these new groups (EE and CE received intensive schooling until the children reached 8 years old, while the other groups (EC and CC received no special treatment. The total sample was measured until each child reached 21 years. The results were as follows: The young adults, treated in the preschool years, had on average significantly higher cognitive test scores, earned higher scores on reading and math tests; they completed more years of education, they were more likely to attend a 4-year college or university, and they were less likely to become teen parents. Furthermore, the mothers of these students were more likely to reach a higher level of instruction and employment. Finally, the article discusses the validity of the study and the factors associated to the benefits (the early beginning, intensity and continuity of the program. Este es un estudio de revisión en el que se analizan las investigaciones que evalúan los efectos a lo largo del tiempo del temprano Abecedarian Project (ABC. El ABC es un programa compensador preventivo de 0-5 años y entresacados de madres de alto riesgo. El grupo experimental (E recibe tratamiento preescolar intensivo, no el control (C. Se prolongó escolarmente hasta los 8 años, subdividiéndose ambos grupos: Dos -EE y CE- recibieron tratamiento intensivo; otros (EC y CC convencional. Fueron medidos hasta los 21. Resultados: Los jóvenes adultos, tratados preescolarmente, mejoraron en rendimiento mental, lector y matemático; alcanzaron mayores instrucción y presencia en

  6. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Science.gov (United States)

    2011-12-29

    ... Cooper Hydroelectric Project On May 26 and November 8, 2011, Commission staff met with representatives of...), licensee for the Santee-Cooper Hydroelectric Project No. 199, to discuss what is needed to complete...

  7. Design Acceptance Passed for CⅡ Engineering Project

    Institute of Scientific and Technical Information of China (English)

    LI; Zhen-yi; LI; Song; XUE; Sui-zhi; LI; Yan; CHENG; Ming

    2012-01-01

    <正>C Ⅱengineering project involves the design and technical services of a reactor electric power supply system, which responds to the requirement of foreign client. The content of this project mainly covers

  8. Research oriented projects on design themese

    DEFF Research Database (Denmark)

    Tollestrup, Christian; Eriksen, Kaare; Ovesen, Nis

    2011-01-01

    How can design students do research-oriented projects about design themes? At the 3rd semester at the Industrial Design Master Program at Aalborg University this is done by taking research oriented learning objectives on design theories and methods and combining them with experimental case studies...... with or without external parties like companies and consultancies. Programming the project is a large part of the 2½ month long project work and a “program” is handed in and evaluated after 3 weeks. During this programming the design students are going through a pre-reflection process, where they are designing...... the setup including the experiment or case that they will be carrying out. This approach shares characteristics of a regular research project, but the extent and level of complexity is much lower and the experiment and case is larger part of the project. At the other end of the project the analysis...

  9. Siting the North Carolina Low-Level Radioactive Waste Facility

    Energy Technology Data Exchange (ETDEWEB)

    Walker, C.K.; MacMillan, J.H. [N.C. Low-Level Radioactive Waste Management Authority, Raleigh, NC (United States)

    1994-12-31

    On December 8, 1993, the North Carolina Low-Level Radioactive Waste Management Authority selected a site in Wake County as the preferred site for the North Carolina low-level radioactive waste disposal facility. This facility will replace the Southeast Compact`s current facility in Barnwell, South Carolina. Five days later, the Authority`s contractors, Chem-Nuclear Systems, Inc., filed a license application for the facility. These two actions culminated six years of work by the Authority and constitute the achievement of a major milestone in the project. Work leading up to this point included field studies, facility design, performance assessment calculations, and a variety of public outreach activities. Pending regulatory approval of the license application, North Carolina is scheduled to open the Southeast Compact`s second LLRW disposal facility in January 1996.

  10. System Design of HVDC Project

    Institute of Scientific and Technical Information of China (English)

    Ma Weimin; Yin Weiyang

    2011-01-01

    BackgroundHVDC transmission system is flexible,controllable,economic and environmentfriendly,which has compelling advantages in bulk long-distance power transfer and interconnection of power systems.Since the first HVDC project was put into commercial operation in Gotland in 1954,over 100 HVDC projects have been operating in the world.Currently,there are a number of HVDC projects under being upgraded,constructed or planed in Europe,North America,South America,Africa and Asia.

  11. Critical Design Reviews Project: SAPHIRE 8

    Energy Technology Data Exchange (ETDEWEB)

    Kurt G. Vedros; Curtis L. Smith

    2011-09-01

    The Critical Design Review (CDR) is intended to be performed at the phase of the design request immediately before proceeding to implementation of the design request. The design request is initiated with a Design Specification document which includes a problem statement, design details, a design checklist and supporting documentation and/or projected sample output. The document then records the process through the Preliminary Design Review (PDR) and on to the finalized design specification. In addition to this, the design specification has a chapter devoted to the completion of the CDR. This document describes the process of documentation of the CDR in the Design Specification.

  12. Roadway Design Guidelines and Project Acknowledgements

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Design guidelines and recommendations for planning and delivering surface transportation projects on Service lands. The main holding (Roadway Design Guidelines) is...

  13. Extending Sociotechnical Design to Project Conception

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    Project management processes offer specific sites for understanding the interplay of the social and the technical. This article focuses on the connection between knowledge and technology through knowledge communication processes, cultural & rhetorical contexts in projects, and the iterative process...... of project conception rooted in sense-making by designers. The data comes from a Project management course in which the students were asked to design and plan projects to situate a mobile phone game in a social context. The course was taught simultaneously at the Helsinki School of Economics in Finland...

  14. CISNet Project's Phytoplankton Pigment Monitoring Database for the North Inlet and Ace Basin Estuaries, South Carolina: 1999-2001

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — EPA/NOAA/NASA CISNet Partnership The Coastal Intensive Site Network (CISNet) was developed by the U.S. Environmental Protection Agency (EPA), National Oceanic and...

  15. ART/Ada design project, phase 1: Project plan

    Science.gov (United States)

    Allen, Bradley P.

    1988-01-01

    The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.

  16. Rapid Robot Design Validation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Energid Technologies will create a comprehensive software infrastructure for rapid validation of robotic designs. The software will support push-button validation...

  17. Rapid Robot Design Validation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Energid Technologies will create a comprehensive software infrastructure for rapid validation of robot designs. The software will support push-button validation...

  18. Adaptive Trajectory Design (ATD) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Mission design within unstable/stable regions needs unification of individual trajectories from different dynamical regimes. NASA needs an automated process to...

  19. Design Projects of the Future

    Science.gov (United States)

    Shaeiwitz, Joseph A.; Turton, Richard

    2006-01-01

    The chemical engineering profession is in the midst of a significant evolution, perhaps a revolution. As the profession moves toward product development and design and away from petroleum and chemical process development and design, a new paradigm for chemical engineering education is evolving. Therefore, a new generation of capstone design…

  20. ART/Ada design project, phase 1

    Science.gov (United States)

    1989-01-01

    An Ada-Based Expert System Building Tool Design Research Project was conducted. The goal was to investigate various issues in the context of the design of an Ada-based expert system building tool. An attempt was made to achieve a comprehensive understanding of the potential for embedding expert systems in Ada systems for eventual application in future projects. The current status of the project is described by introducing an operational prototype, ART/Ada. How the project was conducted is explained. The performance of the prototype is analyzed and compared with other related works. Future research directions are suggested.

  1. Engineering specification and system design for CAD/CAM of custom shoes: UMC project effort

    Science.gov (United States)

    Bao, Han P.

    1991-01-01

    The goal of this project is to supplement the footwear design system of North Carolina State University (NCSU) with a software module to design and manufacture a combination sole. The four areas of concentration were: customization of NASCAD (NASA Computer Aided Design) to the footwear project; use of CENCIT data; computer aided manufacturing activities; and beginning work for the bottom elements of shoes. The task of generating a software module for producing a sole was completed with a demonstrated product realization. The software written in C was delivered to NCSU for inclusion in their design system for custom footwear known as LASTMOD. The machining process of the shoe last was improved using a spiral tool path approach.

  2. Extending Sociotechnical design to project conception

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    the students were asked to design and plan projects to situate a mobile phone game in the social context around a museum in Helsinki or their online course management system.   The paper traces the evolution of students' project goals and objectives with respect to knowledge communication theory, demonstrating...

  3. Design project 1968/9: management report

    OpenAIRE

    College of Aeronautics, (Cranfield)

    2016-01-01

    1. INTRODUCTION The design of an automatic assembly machine with versatility in application was undertaken as a group project by post-graduate students attending a course in production technology. This report summarises the work clone and conclusions reached during the project. In addition there are available five other reports which describe the designing of different areas of the machine in full detail (refs. 1 to 6). There is also the report of a technical survey wh...

  4. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  5. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques.

  6. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. PMID:22423803

  7. Balancing Design Project Supervision and Learning Facilitation

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller

    2012-01-01

    ’s balance between the roles: 1) Design Project Supervisor – and 2) Learning Facilitator – with the aim to understand when to apply the different roles, and what to be aware of when doing so. This paper represents the first pilot-study of a larger research effort. It is based on a Lego Serious Play workshop...... set of demands to the design lecturer. On one hand she is the facilitator of the learning process, where the students are in charge of their own projects, and where learning happens through the students’ own experiences, successes and mistakes and on the other hand she is a supervisor, who uses her......, where both design lecturers and design students participated. The study implies in short that: design project supervision is most requested in the early semesters whereas learning facilitation is requested in the later semesters. Further the study implied a number of focus point for the supervisor...

  8. The Carolina Bay Restoration Project - Status Report II 2000-2004.

    Energy Technology Data Exchange (ETDEWEB)

    Barton, Christopher

    2006-07-13

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report. Post restoration monitoring will continue through 2005. A final report to the Mitigation Bank Review Team will be submitted in mid-2006.

  9. Projecting the Future for Design Science Research

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2015-01-01

    Design science research should be relevant, valuable, purposeful and prescriptive. Its value as a relevant source of prescriptions implies the practical usefulness of its results beyond a single expository instantiation. But propagation of such design science products as design principles....... In this paper we discuss the propagation issues around generalizing design science research across multiple contexts and propose alternative propagation concepts of projectability and entrenchment. The existing concepts around generalizability have issues that make them less suitable for design science research...... or theories have stimulated many actual projections. We demonstrate these concepts in a case study of propagation: a chemical manufacturer and service provider that adopted the design principles arising from that 2012 DESRIST banking-based design science research. We conclude that generalizability is too well...

  10. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  11. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  12. Reference Design Project Book: NUSEL-Homestake

    CERN Document Server

    Haxton, W C

    2003-01-01

    This submission includes the overview, science timeline, reference design, WBS, and mine status sections of the Homestake collaboration's Reference Design Project Book. The Project Book describes the specific plan for converting the Homestake Gold Mine into a facility for physics, earth science, and engineering. The proposed developments on the 7400- and 4850-ft levels are presented, along with the plans for adapting Homestake's existing infrastructure for science. The plan differs substantially from the conceptual design for the National Underground Science and Engineering Laboratory proposed in June, 2001.

  13. Ares Project Overview - Quality in Design

    Science.gov (United States)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  14. Designing Project Management for Global Software Development

    DEFF Research Database (Denmark)

    Tjørnehøj, Gitte; B. Balogh, Maria; Iversen, Cathrine;

    2014-01-01

    in the development projects. This study has identified a range of difficulties described in the literature of global software development, lacking sufficient solutions. In particular, advice for project managers is lacking. Design science research has been applied to design a model to guide project managers......Software development in distributed teams remains challenging despite rapid technical improvement in tools for communication and collaboration across distance. The challenges stem from geographical, temporal and sociocultural distance and manifest themselves in a variety of difficulties...... of distributed software teams, based on a practice study and informed by well-known theories. Our work pinpoints the difficulties of handling the vital informal processes in distributed collaboration that are so vulnerable because the distances risk detaining their growth and increasing their decay rate...

  15. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  16. Breckinridge Project, initial effort. Report II. Breckinridge Project design basis

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Breckinridge Project is a pioneer endeavor involving the engineering, construction, and operation of a commercial facility that will convert 23,000 tons per day of run-of-mine, high-sulfur coal into 50,000 barrels per day of liquid hydrocarbons equivalent to those produced from crude oil. The Initial Effort, now complete, was executed under Cooperative Agreement No. DE-FC05-80OR20717 between the Department of Energy and the Participants, Ashland Synthetic Fuels, Inc., and Airco Energy Company, Inc. The Initial Effort produced a preliminary design, capital estimate, and economic analysis of the commercial plant, as well as a plan for the design, construction, and operation of that plant. The extensive and rigorous attention given to environmental, socioeconomic, safety, and health considerations is indicative of the high priority these issues will continue to receive throughout the life of the project. The Breckinridge Energy Company, a partnership of several major corporations, is being formed to finance, own, and manage the Breckinridge Project. Report II is intended for the reader who is primarily interested in less detailed discussion of the coal liquefaction process and Breckinridge facility than presented in the eleven volumes of Reports IV and V. The overview section describes the project goals and briefly introduces the coal liquefaction process. The report continues with a discussion of the history of the project and the H-COAL process from its concept to the proposed commercialization technology. The report describes the site, the Breckinridge Facility, and concludes with a summary of the eleven reports that contain the deliverable documentation of the Initial Effort or Development Phase of the project.

  17. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.

  18. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    International Nuclear Information System (INIS)

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability

  19. CREEK Project's Water Chemistry, Chlorophyll a, and Suspended Sediment Weekly Monitoring Database for Eight Creeks in the North Inlet Estuary, South Carolina: 1997-2000.

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — A group of eight tidal creeks dominated by oysters, Crassostrea virginica, in North Inlet Estuary, South Carolina, USA were studied using a replicated BACI (Before...

  20. CREEK Project's Oyster Growth and Survival Monitoring Database for Eight Creeks in the North Inlet Estuary, South Carolina: 1997-1999.

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — A group of eight intertidal creeks with high densities of oysters, Crassostrea virginica, in North Inlet Estuary, South Carolina, USA were studied using a...

  1. From IDSA: Preschool Toy Design Project as a Transition to More Complex Design Projects

    Science.gov (United States)

    Reeder, Kevin

    2005-01-01

    Sophomore year is an intense introduction into the theories and skills germane to the profession of Industrial Design. Design projects will address one to three design elements at a time to promote understanding and manipulation of concepts, such as: (a) theories of two and three dimensional form development are practiced and presented; (b)…

  2. Newspaper Advertising Trends and Teacher Supply in the Carolinas.

    Science.gov (United States)

    Dewalt, Mark W.; Graham, Patricia L.

    This year-long research project documented critical issues of supply and demand for teachers in the Carolinas. Researchers focused on the number of public and private school education positions advertised in the four major newspapers serving South Carolina and the Charlotte metropolitan region of North Carolina. They documented advertising trends…

  3. The dam design of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    Wang Xiaomao; Xu Linxiang; Liao Renqiang

    2011-01-01

    The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m, the maximum height of 181 m and dam axis length of 2 309.5 m. The dam consists of spillway, powerhouse, non-over flow, ship-lift, temporary ship-lock, left diversion wall and longitudinal cofferdam blocks. Some key techniques relating to dam structure design are presented, including hydraulics of flood discharge structure, dam joint design, layout and structural type of penstock, deep anti-sliding stability of dam foundation, reconstruction of temporary ship-lock and closed drainage and pumping of dam foundation.

  4. 75 FR 36348 - Opportunity for Designation in the Amarillo, TX; Cairo, IL; and State of North Carolina Areas

    Science.gov (United States)

    2010-06-25

    ... Donley County; the southern Donley and Armstrong County lines west to Prairie Dog Town Fork of the Red River; Prairie Dog Town Fork of the Red River northwest to State Route 217; State Route 217 west to FM... Carolina) official agencies will end on September 30, 2010. In the March 31, 2010, Federal Register (71...

  5. Project design third axis of paragliding simulator

    OpenAIRE

    Valle Beltran, Lluis

    2014-01-01

    Paragliding accidents are often caused by unpredictable weather conditions that may produce air turbulence. Air turbulence is equally dangerous to both experienced and inexperienced pilots alike, as it is invisible and can cause symmetric or asymmetric wing collapse. Research shows that the main problem in the case of wing collapse accidents is that the pilot experiencing the collapse does not react quickly and/or appropriately enough. This project proposal provides the design and suggests...

  6. Lost lake - restoration of a Carolina bay

    Energy Technology Data Exchange (ETDEWEB)

    Hanlin, H.G.; McLendon, J.P. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology; Wike, L.D. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology]|[Westinghouse Savannah River Co., Aiken, SC (United States). Savannah River Technology Center; Dietsch, B.M. [Univ. of South Carolina, Aiken, SC (United States). Dept. of Biology and Geology]|[Univ. of Georgia, Aiken, SC (United States)

    1994-09-01

    Carolina bays are shallow wetland depressions found only on the Atlantic Coastal Plain. Although these isolated interstream wetlands support many types of communities, they share the common features of having a sandy margin, a fluctuating water level, an elliptical shape, and a northwest to southeast orientation. Lost Lake, an 11.3 hectare Carolina bay, was ditched and drained for agricultural production before establishment of the Savannah River Site in 1950. Later it received overflow from a seepage basin containing a variety of chemicals, primarily solvents and some heavy metals. In 1990 a plan was developed for the restoration of Lost Lake, and restoration activities were complete by mid-1991. Lost Lake is the first known project designed for the restoration and recovery of a Carolina bay. The bay was divided into eight soil treatment zones, allowing four treatments in duplicate. Each of the eight zones was planted with eight species of native wetland plants. Recolonization of the bay by amphibians and reptiles is being evaluated by using drift fences with pitfall traps and coverboard arrays in each of the treatment zones. Additional drift fences in five upland habitats were also established. Hoop turtle traps, funnel minnow traps, and dip nets were utilized for aquatic sampling. The presence of 43 species common to the region has been documented at Lost Lake. More than one-third of these species show evidence of breeding populations being established. Three species found prior to the restoration activity and a number of species common to undisturbed Carolina bays were not encountered. Colonization by additional species is anticipated as the wetland undergoes further succession.

  7. 2014 Horry County, South Carolina Lidar

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set is comprised of lidar point cloud data. This project required lidar data to be acquired over Horry County, South Carolina. The total area of the Horry...

  8. 2008 South Carolina Lidar: Chester County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  9. 2008 South Carolina Lidar: Marion County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  10. 2008 South Carolina Lidar: Newberry County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  11. 2008 South Carolina Lidar: Clarendon County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  12. 2008 South Carolina Lidar: Chesterfield County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  13. 2008 South Carolina Lidar: Williamsburg County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  14. 2008 South Carolina Lidar: Marlboro County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  15. 2008 South Carolina Lidar: Greenwood County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  16. 2008 South Carolina Lidar: Darlington County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  17. 2008 South Carolina Lidar: Lancaster County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  18. 2008 South Carolina Lidar: Orangeburg County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  19. 2008 South Carolina Lidar: Laurens County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  20. 2008 South Carolina Lidar: Union County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  1. 2008 South Carolina Lidar: Cherokee County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  2. 2008 South Carolina Lidar: Dillon County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  3. 2008 South Carolina Lidar: Fairfield County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  4. The R.M.C. Design-Build-Test Projects

    Science.gov (United States)

    Ellis, J. S.

    1971-01-01

    Four projects were assigned to final year civil engineering undergraduates in a course on structural steel design. The projects involved the design, construction, and testing of two columns and two trusses. (TS)

  5. Design of inverters for the PHOTONERGY project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-08-01

    The PHOTONERGY project (the former SolcelleInverter project) was initiated on the 1st of September 2001, with a state-of-the-art analysis, which concluded into specifications. Based on this 23 topologies were analyzed in for efficiencies. The results from this analysis was five candidates which all showed a somewhat good efficiency. These five topologies were in further investigated by means of an initial design-iteration and simulations. Two different solutions were picked up in due to their high efficiency and low cost. 1. The standard full-bridge phase shifted DC/DC converter together with a standard DC/AC inverter, 2. A modified version of the novel Shimizu topology. A patent is pending on this modified version. These two inverters are in this document developed and made ready for prototyping. This includes design and selection of reactive- and switching-components, e.g. filter- and bulk-capacitors, low- and high-frequency inductors, high frequency transformers, MOSFETs and diodes. The design of auxiliary circuits is also included, e.g. gate drivers for the MOSFETs, measuring circuits for the grid-current and -voltage, PV-module-current and voltage, protection circuits, hardware near controllers and finally a switch mode power supply. However, the design of the various controllers, except the hardware near PV-current controller for the full bridge phase shifted converter, is not documented in this report but will come later on. This includes all controllers, e.g. maximum power point tracking for the PV-module, utility grid current controller, DC-link voltage controller, phase locked loops, and detection of islanding operation. All of these control loops are to be implemented in a micro-controller. (au)

  6. An Engineering Design STEM Project: T-Shirt Launcher

    Science.gov (United States)

    Fantz, Todd D.; Grant, Melva R.

    2013-01-01

    The article offers information on making technology education students interested in science and mathematics through the use of a T-shirt launcher design project. This project was designed for junior and senior level high school students who have completed or are currently taking physics and precalculus. The project involves designing an…

  7. Intensive archaeological survey of the F/H Surface Enhancement Project Area, Savannah River Site, Aiken and Barnwell Counties, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Sassaman, K.E.; Gillam, J.C.

    1993-08-01

    Twelve archaeological sites and four artifact occurrences were located by intensive survey of two tracts of land for the F and H Surface Enhancement Project on the Savannah River Site, Aiken and Barnwell Counties, South Carolina. Fieldwork in the 480-acre project area included surface reconnaissance of 3.6 linear kilometers of transects, 140 shovel tests along 4.2 linear kilometers of transects, an additional 162 shovel tests at sites and occurrences, and the excavation of six l {times} 2 m test units. All but one of the sites contained artifacts of the prehistoric era; the twelfth site consists of the remains of a twentieth-century home place. The historic site and six of the prehistoric sites consist of limited and/or disturbed contexts of archaeological deposits that have little research potential and are therefore considered ineligible for nomination to the National Register of Historic Places (NRHP). The remaining five sites have sufficient content and integrity to yield information important to ongoing investigations into upland site use. These sites (38AK146, 38AK535, 38AK539, 38AK541, and 38AK543) are thus deemed eligible for nomination to the NRHP and the Savannah River Archaeological Research Program (SRARP) recommends that they be preserved through avoidance or data recovery.

  8. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  9. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  10. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Darlington County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  11. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Clarendon County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  12. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Greenwood County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  13. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Marlboro County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  14. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Fairfield County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  15. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Marion County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  16. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Orangeburg County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  17. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Cherokee County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  18. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Chester County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  19. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Dillon County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  20. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Newberry County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  1. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Union County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  2. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Williamsburg County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  3. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Chesterfield County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  4. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Lancaster County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  5. 2008 South Carolina Department of Natural Resources (SCDNR) South Carolina Lidar - Laurens County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The project area is composed of 16 counties in the State of South Carolina - Cherokee, Union, Laurens, Greenwood, Newberry, Chester, Fairfield, Lancaster,...

  6. Carolinas Energy Career Center

    Energy Technology Data Exchange (ETDEWEB)

    Classens, Anver; Hooper, Dick; Johnson, Bruce

    2013-03-31

    Central Piedmont Community College (CPCC), located in Charlotte, North Carolina, established the Carolinas Energy Career Center (Center) - a comprehensive training entity to meet the dynamic needs of the Charlotte region's energy workforce. The Center provides training for high-demand careers in both conventional energy (fossil) and renewable energy (nuclear and solar technologies/energy efficiency). CPCC completed four tasks that will position the Center as a leading resource for energy career training in the Southeast: • Development and Pilot of a New Advanced Welding Curriculum, • Program Enhancement of Non-Destructive Examination (NDE) Technology, • Student Support through implementation of a model targeted toward Energy and STEM Careers to support student learning, • Project Management and Reporting. As a result of DOE funding support, CPCC achieved the following outcomes: • Increased capacity to serve and train students in emerging energy industry careers; • Developed new courses and curricula to support emerging energy industry careers; • Established new training/laboratory resources; • Generated a pool of highly qualified, technically skilled workers to support the growing energy industry sector.

  7. An economic and performance design study of solar preheaters for domestic hot water heaters in North Carolina

    Science.gov (United States)

    Jones, C. B.; Smetana, F. O.

    1977-01-01

    The performance and estimated material costs for several solar preheaters for domestic hot water heaters using isolation levels present in North Carolina are presented. The effects of monthly variations in isolation and the direction of incident radiation are included. Demand is assumed at 13 gallons (49.2 liters) per day per person. The study shows that a closed circulation system with 82 gallons (310 liters) of preheated storage and 53.4 cu ft (4.94 cu m) of collector surface with single cover can be expected to cost about $800 and to repay it capital cost and interest (at 8%) in 5.2 years, assuming present electric rates increase at 5% per year.

  8. An Overview of Three Gorges Project Design

    Institute of Scientific and Technical Information of China (English)

    Zheng Shouren

    2010-01-01

    @@ Objectives and benefits of the project Flood control The Three Gorges Project(TGP)is a key project to the harnessing and development of the Yangtze River.The damsite is located at Sandouping in Xiling gorge of the Yangtze Three Gorges,Yichang City,Hubei Province,38 km from its downstream Gezhouba hydroproject.

  9. Validation of Factors Influencing Successful Small Scale Farming in North Carolina

    OpenAIRE

    Yeboah, Anthony K.; Owens, John Paul; Bynum, Jarvetta S.; Boisson, Daniel

    2010-01-01

    This phase of the research project involves developing a survey instrument to test the validity and predictive value of the variables identified in previous case studies. Given the importance of small farm viability, this research project focuses on identifying ways to further enhance successful small farming in North Carolina. The survey instrument was designed to solicit production and financial data, attitudes and beliefs about farming, as well as demographic questions. The results demonst...

  10. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  11. Teaching Top Down Design of Analog/Mixed Signal ICs Through Design Projects

    OpenAIRE

    Andersson, Martin; Wernehag, Johan; Axholt, Andreas; Sjöland, Henrik

    2007-01-01

    This paper describes a project course that focuses on the design of analog and mixed signal circuits through a systematic top down design flow. In the project, the student will be involved in the planning, modeling, circuit level design, physical level implementation and measurement verification of for example a successive approximation (SA) ADC or a class-D audio amplifier. Throughout the project, the project members will improve their design skills and create an unde...

  12. CISNet Project’s Water Quality Monitoring Database for North Inlet and ACE Basin Estuaries, South Carolina: 1999-2001.

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — EPA/NOAA/NASA CISNet Partnership The Coastal Intensive Site Network (CISNet) was developed by the U.S. Environmental Protection Agency (EPA), National Oceanic and...

  13. Wildlife underpasses on U.S. 64 in North Carolina: integrating management and science objectives

    Science.gov (United States)

    Jones, Mark D.; Van Manen, Frank T.; Wilson, Travis W.; Cox, David R.

    2010-01-01

    This chapter on wildlife underpasses on U.S. Highway 64 in North Carolina is from a book on highways, wildlife, and habitat connectivity. U.S. 64 is an important route in North Carolina connecting major population centers and highways that underwent a major upgrade from a two-lane rural road to a major highway. New routes were proposed for a large portion of the project (28 miles) to improve driver safety and increase speed limits to 70 miles per hour (from the previously posted 55 mph). The authors review the geographical, historical, political, and social setting; the roadway and environmental issues; the rationale for the project; critical factors; outcomes of the project; and lessons learned. The area of the project supports high wildlife densities, including American black bears, white-tailed deer, red wolves, and bobcats. Critical factors to be incorporated into wildlife mitigation measures: driver safety, underpass construction costs, and permitting by the U.S. Fish and Wildlife Service and the U.S. Army Corps of Engineers. The U.S. 64 underpasses, completed in 2005, were the first in North Carolina designed specifically for wildlife and according to specifications provided by the North Carolina Wildlife Resources Commission (NCWRC). The authors describe the underpass specifications recommended based on this project, including size, control of public access, fencing, gates, and maintenance (notably vegetation management). The authors conclude that one of the most beneficial outcomes of this project was the fact that, since the completion of the U.S. 64 underpasses, the North Carolina Department of Transportation (NCDOT) routinely considers wildlife passageways for road projects in the state.

  14. The Design of Project Management Structural Organization

    OpenAIRE

    Dumitru Constantinescu; Cristian Etegan

    2007-01-01

    The relationships organization-suppliers-customers have recently known major changes in the structure of services and have made the organization develop its managerial and professional competencies in order to do projects. The qualified organization is the most trust-worthy in the process of doing a project. The participation of an organization in doing projects depends on a multitude of factors. Out of these factors, the structural organization comes forth, as it represents the variable with...

  15. Interfacial Design of Composite Ablative Materials Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase I Small Business Innovative Research project proposes to develop a multiscale computational methodology capable of accurate prediction of the properties...

  16. Interfacial Design of Composite Ablative Materials Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research (SBIR) project proposes the development of a computational software package to provide NASA with advanced materials...

  17. Propulsion Design with Freeform Fabrication Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Propulsion Design with Freeform Fabrication (PDFF) will develop and implement a novel design methodology that leverages the rapidly evolving Solid Freeform...

  18. Integrated Variable Fidelity Conceptual Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — CADNexus proposes to develop an Integrated Variable Fidelity Conceptual Design tool. The application will enable design and analysis of unconventional and advanced...

  19. Altitude Compensating Nozzle Design Tool Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Launch vehicle subsystem preliminary design tools that are fast, accurate, and seamlessly integrated into an electronic design and optimization environment have...

  20. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  1. Assessment of primary production and optical variability in shelf and slope waters near Cape Hatteras, North Carolina. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Redalje, Donald G.; Lohrenz, Stevern E.

    2001-02-12

    In this project we determined primary production and optical variability in the shelf and slope waters off of Cape Hatteras, N.C. These processes were addressed in conjunction with other Ocean Margins Program investigators, during the Spring Transition period and during Summer. We found that there were significant differences in measured parameters between Spring and Summer, enabling us to develop seasonally specific carbon production and ecosystem models as well as seasonal and regional algorithm improvements for use in remote sensing applications.

  2. A prototype of workflow management system for construction design projects

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    A great deal of benefits can be achieved if information and process are integrated within the building design project. This paper aims to establish a prototype of workflow management system for construction design project through the application of workflow technology. The composition and function of prototype is presented to satisfy the needs of information share and process integration. By integrating all subsystems and modules of the prototype, the whole system can deal with design information-flow modeling, emulating and optimizing, task planning and distributing, automatic tracking and monitoring, as well as network service, etc. In this way, the collaborative design environment of building design project is brought into being.

  3. Hovercraft Project Teaches Design and Testing Processes

    Science.gov (United States)

    Keesling, Daryl

    2011-01-01

    Building hovercraft has proven very popular with the author's engineering students at Knightstown Community High School. The activity uses inexpensive, readily available materials: foam board, a pop-up water bottle cap, a balloon, and hot glue. In this article, the author describes the hovercraft project and how the project provides excellent…

  4. Designing and Fostering Effective Online Group Projects

    Science.gov (United States)

    Scherling, Sarah E.

    2011-01-01

    Collaborative learning is a hallmark of adult education and a popular instructional strategy. For over a decade, as an educator of adult learners, the author has integrated group work into courses. Group projects require the contribution and evaluation from all group members and often reflect a collective grade at the end of the project. However,…

  5. Design and Co-design of Project-organized Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche; Andreasen, Lars Birch

    2014-01-01

    The chapter contributes to discussions on design processes in relation to education, presenting different notions of design research and demonstrating how professors and students are involved together in designing innovative and constructive study processes that can help foster students' engageme...

  6. Discrete-event simulation for design of enhanced project schedules

    DEFF Research Database (Denmark)

    Lazarova-Molnar, Sanja; Mizouni, Rabeb

    2013-01-01

    Having an initial project schedule to a great extent determines success of projects. However, because of unpredicted factors, actual project development usually deviates from its initial schedule, a situation that requires intervention of project managers to take appropriate remedial actions....... To support project managers in this tremendous task, Enhanced Project Schedules (EPS) have been proposed. They incorporate a high degree of uncertainty by providing, in addition to the initial project schedule, a set of remedial actions recommendations. Identifying the appropriate set of remedial actions...... that supports meeting project goals is challenging. In this paper, we propose a discrete-event simulation approach to identify the optimal remedial action scenarios set given a project schedule goal. We detail the discrete-event simulation approach to design enhanced project schedules....

  7. Group Projects in Interior Design Studio Classes: Peer Feedback Benefits

    Science.gov (United States)

    Jurado, Juan A.

    2011-01-01

    Group projects have been shown to be effective for providing peer feedback in classrooms. While students in regular enrollment classes benefit from peer feedback, low-enrollment classes face many challenges. This study compares peer feedback effectiveness between two interior design studio classes with different design projects. In one class,…

  8. Turbopump Design for Deep Throttling Capability Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A rocket engine turbopump design using a partial emission pump combined with a zero net positive suction pressure inducer design is proposed to achieve a robust,...

  9. A study on design improvement management of nuclear power project

    International Nuclear Information System (INIS)

    Existing good practice and future actions of design improvement management in CNNC are discussed in this paper. Firstly the overall status and experiences of design improvement work of CNNC nuclear power plants are briefly introduced. And then three examples of Qinshan Phase Ⅱ Extension Project, Qinshan Phase Ⅰ Extension Project and AP1000 Project are presented to show the practical implementation and effect of design improvement. Lastly several suggestions are proposed for nuclear power industry to continuously promote the design improvement work in the future. (authors)

  10. User Oriented Cooperative Interaction Design : A multidisciplinary project course

    OpenAIRE

    Sundblad, Yngve; Winberg, Fredrik; Westerlund, Bo; Lantz, Ann

    2006-01-01

    In this paper we give a “case story” experience from development, practice and results from a method and project course on User Oriented Interaction Design. The course is intended for last year Masters’ students from different backgrounds, computer science as well as social science and design disciplines. The course was inspired by student and teacher participation in the Apple Interface Design Project 1993, 1994 and 1995, when it was established as a regular course at three higher educationa...

  11. Yucca Mountain Project Surface Facilities Design

    Energy Technology Data Exchange (ETDEWEB)

    P.W. McDaniel; N.R. Brown; P.G. Harrington; J.T. Gardiner; L.J. Trautner

    2002-11-20

    With the recent designation of the Yucca Mountain site as a proposed repository for the disposal of commercial spent nuclear fuel, DOE spent nuclear fuel and high- level waste, work is proceeding on the design of surface facilities to receive, unload, and package the waste into waste packages for emplacement in the repository. This paper summarizes recent progress in the design of these surface facilities.

  12. Advanced Modeling Concepts for Conceptual Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Preliminary design of aircraft structures is multidisciplinary, involving knowledge of structural mechanics, aerodynamics, aeroelasticity, structural dynamics and...

  13. Engineering Design Projects as a Reflection Promoter

    Science.gov (United States)

    Sabag, Nissim; Trotskovsky, Elena; Waks, Shlomo

    2014-01-01

    This article describes examples of reflection documented in a longitudinal research comprising two studies: a three-year three-stage study on technology project-based learning (TPBL) and a three-year two-stage study on engineering thinking (ET). Both studies used qualitative tools such as interviews, active observations, and document analysis.…

  14. Designing Appropriate Scaffolding for Student Science Projects

    Science.gov (United States)

    Johnson, Marie; Smith, Mark

    2008-01-01

    The authors have developed a successful approach to teaching and inspiring undergraduate science and nonscience majors to complete creditable, semester-long, hands-on science research projects. This approach utilizes a carefully developed scaffolding consisting of in-class exercises and discussions, preparatory homework and lab events, and three…

  15. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  16. VCM Process Design: An ABET 2000 Fully Compliant Project

    Science.gov (United States)

    Benyahia, Farid

    2005-01-01

    A long experience in undergraduate vinyl chloride monomer (VCM) process design projects is shared in this paper. The VCM process design is shown to be fully compliant with ABET 2000 criteria by virtue of its abundance in chemical engineering principles, integration of interpersonal and interdisciplinary skills in design, safety, economics, and…

  17. [Design of a pedagogical project: collective experience].

    Science.gov (United States)

    da Silva, Maria Josefina; Araújo, Maria Fátima Maciel; Leitão, Glória da Conceição Mesquita

    2003-01-01

    This study describes the ongoing experience to reform the pedagogical project of the undergraduate nursing program from Federal University of Ceará, based on the curricular guidelines approved by CNE/CE,S in 2001. It exposes the process of compliance the professors and students had to go through in order to abide by the proposal introduced by LDB/96 (Basic Guidelines Law/95), as well as the different stages needed to build referential, conceptual, and philosophical landmarks. The difficulties experienced relate to a poor commitment of professors to this process, due to the peculiar situation of the program: many professors retiring; a high number of substitute professors under provisional circumstances, which refrained them from long-term commitment. The adoption of a political-pedagogical project aimed at a reform of nursing teaching cannot occur in this situation. PMID:14699756

  18. Design of Versatile Food Extruder Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal addresses the need for food processing equipment for crews on long-term Advanced Life Support Systems (ALSS) missions. It is proposed to design a food...

  19. Unsteady Design Optimization for Aeroelasticity Applications Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Aeroelasticity plays an important role in the design and development of highly flexible flight vehicles and blended wing body configurations. The operating margins...

  20. High-Rate Receiver Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose an initial architectural and preliminary hardware design study for a high-rate receiver capable of decoding modulation suites specified by CCSDS...

  1. User Interactive Guided Search Design Environment Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Phoenix Integration's vision is to create an intuitive human-in-the-loop engineering design environment called Guided Search that leverages recent advances in...

  2. BUILDING SUSTAINABLE ARCHITECTURAL DESIGN: A RENOVATION PROJECT

    OpenAIRE

    ÜNALAN, Hakan; TOKMAN, Leyla Yekdane

    2011-01-01

    Today, the conservation of energy and respect for the natural environment appears to be the most important phenomena in all areas. In this regard, "sustainability" concept emerged and the architectural platform "Sustainable Architecture" is composed of a research subject to the new and permanent. Architecture underlying the "design" as including also the new concept of "sustainable architectural design" has revealed that field.    Sustainable architecture "building in-house", "...

  3. BUILDING SUSTAINABLE ARCHITECTURAL DESIGN: A RENOVATION PROJECT

    OpenAIRE

    Hakan ÜNALAN,; Tokman, Leyla Y.

    2011-01-01

    Today, the conservation of energy and respect for the natural environment appears to be the most important phenomena in all areas. In this regard, "sustainability" concept emerged and the architectural platform "Sustainable Architecture" is composed of a research subject to the new and permanent. Architecture underlying the "design" as including also the new concept of "sustainable architectural design" has revealed that field. Sustainable architecture "building in-house", "building envelop...

  4. Computer Aided Design Tools for Extreme Environment Electronics Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This project aims to provide Computer Aided Design (CAD) tools for radiation-tolerant, wide-temperature-range digital, analog, mixed-signal, and radio-frequency...

  5. Design Documentation for JaWE2Openflow Project

    Energy Technology Data Exchange (ETDEWEB)

    Mehta, N; Barter, R H

    2004-07-29

    Lawrence Livermore National Laboratory (LLNL) has chosen CIGNEX Technologies, Inc. (CIGNEX) to design and develop the JaWE2Openflow conversion software. This document was created by CIGNEX as a project deliverable.

  6. Fuel Cell Car Design Project for Freshman Engineering Courses

    Science.gov (United States)

    Duke, Steve R.; Davis, Virginia A.

    2014-01-01

    In the Samuel Ginn College of Engineering at Auburn University, we have integrated a semester long design project based on a toy fuel cell car into our freshman "Introduction to Chemical Engineering Class." The project provides the students a basic foundation in chemical reactions, energy, and dimensional analysis that facilitates…

  7. Instructional Design and Project Management: Complementary or Divergent?

    Science.gov (United States)

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  8. The hydrogeologic framework and a reconnaissance of ground-water quality in the Piedmont Province of North Carolina, with a design for future study

    Science.gov (United States)

    Harned, Douglas

    1989-01-01

    The U.S. Geological Survey is investigating the relation of ground- water quality and land use in the regolith and fractured rock ground-water system of the North Carolina Piedmont. The initial phase of this study provides a description of the ground-water flow system and a review of available ground-water data and formulates hypotheses that guide the design of a water-quality monitoring network for study of selected areas. In the Piedmont, the solid igneous and metamorphic bedrock grades upward into unweathered fractured rock that is covered by a transition zone of highly-fractured, partially weathered rock, clay-rich saprolite, and the soil. The fractured bedrock, transition zone, saprolite, and soil make up a complex flow system. A review of available ground-water quality data shows a lack of information about organic compounds and trace metals and changes in ground- water quality with depth. Land use, soils, and geology significantly influence ground-water quality. The hypotheses that need to be tested in the next study phase are: (1) that ground-water contamination can be related to land use, and (2) that the transition zone between bedrock and regolith serves as a primary transmitter of contaminants. Monitoring of basins containing industrial, urban, residential, and agricultural land uses in future studies will help define the relation of ground-water quality to land use. Water quality at different depths in the flow system and in streams during base flow needs to be identified.

  9. CEBAF design overview and project status

    International Nuclear Information System (INIS)

    The Continuous Beam Accelerator Facility (CEBAF) will be an electron accelerator for nuclear physics research providing continuous beams with energies up to at least 4 GeV. The CEBAF is a recirculating linac. The design rationale, performance objectives, concept and fundamental choices for the CEBAF are discussed. 19 references, 10 figures, 1 table

  10. CAD Skills Increased through Multicultural Design Project

    Science.gov (United States)

    Clemons, Stephanie

    2006-01-01

    This article discusses how students in a college-entry-level CAD course researched four generations of their family histories and documented cultural and symbolic influences within their family backgrounds. AutoCAD software was then used to manipulate those cultural and symbolic images to create the design for a multicultural area rug. AutoCAD was…

  11. 10-m platform array telescope design for the AMIBA project

    Science.gov (United States)

    Martin, Robert N.; Kingsley, Jeffrey S.

    2000-07-01

    We present a unique hexapod platform array for the new Taiwanese AMIBA project. AMIBA is a 90 GHz radio interferometric array consisting of 19 elements mounted on a roughly 10 m diameter platform. A hexapod mount is used to steer this platform. The resulting design is lightweight in comparison to a more conventional mount. The design goals of pointing stability, platform accuracy and reduced cost can be met with this design. A metrology system for pointing is proposed for inclusion in the design.

  12. Closed and Open Design Projects in the Education of Engineers

    DEFF Research Database (Denmark)

    Franksen, Ole Immanuel

    1965-01-01

    The two aspects of engineering education are the teaching of science and the teaching of design. By ``design'' is meant the procedure of selecting and combining distinct elements to create complete systems which will perform useful functions. In this paper, the author describes the application of...... this concept of design teaching at The Technical University of Denmark, after a procedure which includes a sequence of closed and open design projects in both computational and experimental laboratories...

  13. Risk Classification Model for Design and Build Projects

    Directory of Open Access Journals (Sweden)

    O. E. Ogunsanmi

    2011-07-01

    Full Text Available The purpose of this paper is to investigate if the various risk sources in Design and Build projects can be classified into three risk groups of cost, time and quality using the discriminant analysis technique. Literature search was undertaken to review issues of risk sources, classification of the identified risks into a risk structure, management of risks and effects of risks all on Design and Build projects as well as concepts of discriminant analysis as a statistical technique. This literature review was undertaken through the use of internet, published papers, journal articles and other published reports on risks in Design and Build projects. A research questionnaire was further designed to collect research information. This research study is a survey research that utilized cross-sectional design to capture the primary data. The data for the survey was collected in Nigeria. In all 40 questionnaires were sent to various respondents that included Architects, Engineers, Quantity Surveyors and Builders who had used Design and Build procurement method for their recently completed projects. Responses from these retrieved questionnaires that measured the impact of risks on Design and Build were analyzed using the discriminant analysis technique through the use of SPSS software package to build two discriminant models for classifying risks into cost, time and quality risk groups. Results of the study indicate that time overrun and poor quality are the two factors that discriminate between cost, time and quality related risk groups. These two discriminant functions explain the variation between the risk groups. All the discriminating variables of cost overrun, time overrun and poor quality demonstrate some relationships with the two discriminant functions. The two discriminant models built can classify risks in Design and Build projects into risk groups of cost, time and quality. These classifications models have 72% success rate of classification

  14. Design and Co-Design of Project-Organized Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche; Birch Andreasen, Lars

    2014-01-01

    ’ engagement, self-awareness, mutual evaluation, reflec- tion, and critical and creative thinking. The case presented and analyzed is the master’s program ICT and learning (MIL), where Roskilde University is partner in the cross-insti- tutional collaboration behind the program. Why. It is a challenge for the......What. The chapter contributes to discussions on design processes in relation to educa- tion, presenting different notions of design research and demonstrating how professors and students are involved together in designing innovative and constructive study pro- cesses that can help foster students......-ended and directed at handling unknown and dynamic processes. Where. Problem-based approaches are relevant for master’s programs with a need for collaboration, flexibility, and implementation of technologies to overcome time, space, and geographical limitations, and for study programs, where students are...

  15. Integrating chemical engineering fundamentals in the capstone process design project

    DEFF Research Database (Denmark)

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik;

    2010-01-01

    of the CDIO standards – especially standard 3 – Integrated Curriculum - means that the course projects must draw on competences provided in other subjects which the students are taking in parallel with Process Design – specifically Process Control and Reaction Engineering. In each semester of the B.......Eng. education, one course is designated the “project” course, which should draw on material learned in parallel courses. In the 6th semester, Process Design is the project course. Process Control and Reaction Engineering are then incorporated into the final plant design project. Specifically, almost all......All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30...

  16. Designing and Implementing a Unique Website Design Project in an Undergraduate Course

    Science.gov (United States)

    Kontos, George

    2016-01-01

    The following paper describes a distinctive collaborative service-learning project done in an undergraduate class on web design. In this project, students in a web design class contacted local community non-profit organizations to create websites (collections of web pages) to benefit these organizations. The two phases of creating a website,…

  17. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly ignored.…

  18. Brand ONLY Ex-Senior Designer Signs Project with Jintian

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    On the afternoon of Aug.24th,Aurelien Lecour,an ex-senior designer of the famous brand ONLY,appears at a news conference in Shanghai to attend signing ceremony for his design consulting service project with his

  19. IMPROVING KNOWLEDGE CAPTURE DURING CONCEPTUAL DESIGN PHASE OF BUILDING PROJECTS

    OpenAIRE

    POURZOLFAGHAR, ZOHREH

    2010-01-01

    Incomplete knowledge flow between architects and mechanical/electrical engineers engenders large expense and untimely delivery of building projects. It is essential to consider mechanical/electrical requirements from the early stages of design; and many experienced architects acknowledge this knowledge entities and the necessity for considering them at the right time. Therefore, inefficient knowledge flow among professionals during architectural conceptual design is emphasiz...

  20. A Guidebook to Selected Projects in Design Education.

    Science.gov (United States)

    Bell, Denise A.; Mirochnik, Elijuh

    Design education includes those projects or activities where children are actively engaged in a process of making and doing with architecture, landscape architecture, urban design, and/or city planning as a context for the learning activity. The goal of such experiences is to sensitize children to their surroundings and better inform them about…

  1. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  2. Project W-441, cold vacuum drying facility design requirements document

    Energy Technology Data Exchange (ETDEWEB)

    O`Neill, C.T.

    1997-05-08

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage.

  3. 76 FR 28016 - Progress Energy Carolinas, Inc.; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2011-05-13

    ... 29, 2011. d. Applicant: Progress Energy Carolinas, Inc. e. Name of Project: Yadkin-Pee Dee Hydroelectric Project. f. Location: The Pee Dee River in Stanly County, North Carolina. g. Filed Pursuant to... include your name and contact information at the end of your comments. Please include the project...

  4. Factors Influencing Successful Small-Farm Operations in North Carolina

    OpenAIRE

    Yeboah, Anthony K.; Owens, John Paul; Bynum, Jarvetta S.

    2011-01-01

    The overall goal of this research project is to identify and refine factors influencing successful small farm operations in North Carolina. Small farms account for 91 percent of all farms. Given the importance of small farm viability, this research project focuses on identifying ways to further enhance successful small farming in North Carolina. In an effort to further explain the factors that affect successful small-scale farming, researchers have identified factors that have underpinnings i...

  5. Creating New Design-Build-Test Experiences as Outputs of Undergraduate Design-Build-Test Projects

    OpenAIRE

    Hermon, John Paul

    2016-01-01

    This paper describes a methodology of using individual engineering undergraduate student projects as a means of effectively and efficiently developing new Design-Build-Test (DBT) learning experiences and challenges. A key aspect of the rationale for this approach is that it benefits all parties. The student undertaking the individual project gets an authentic experience of producing a functional artefact, which has been the result of a design process that addresses conception, design, impleme...

  6. Site restoration: Restoring Lost Lake, a Carolina bay at the Savannah River Site

    International Nuclear Information System (INIS)

    The Savannah River Site (SRS) in Aiken, SC, is part of the U.S. Department of Energy complex for production of materials for U.S. Government defense activities. From 1958 to 1985 mixed wastes (wastes which are both hazardous and radioactive) generated by aluminum forming/metal finishing processes at SRS were discharged to a settling basin with overflow directed to an adjacent Carolina bay known as Lost Lake. Use of the basin system was discontinued in 1985, and physical closure in situ began in 1988. The project's Closure Plan required that Lost Lake be restored to a 'natural wetland system'. An on-site interdisciplinary team designed the restoration project to demonstrate the effectiveness of various levels of active remediation of Carolina bays as well as restoring Lost Lake. Closure was completed in August 1991, and the site will be maintained for at least 30 years. (author)

  7. Implementation of a Project-Based Telecommunication Engineering Design Course

    OpenAIRE

    Ali Akbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel; Nauwelaers, Bart; Vandenbosch, Guy; Schreurs, Dominique

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in Telecommunication Engineering. This course, which requires a combination of technical and softskills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main implementation challenge is the need for instructors to define graduate-level GIL activities which are unique for the project objectives and scope. This ...

  8. Preliminary Design Report for the Yakima/Klickitat Production Project.

    Energy Technology Data Exchange (ETDEWEB)

    US Bonneville Power Administration

    1990-04-01

    A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Task 1. Agreement on a refined statement of project goals. Task 2. Completion of a technical analysis of water supplies. Task 3. Completion of an experimental design plan. Task 4. Development of a harvest management plan. Task 5. Assessment of potential genetic risks. Task 6. Project coordination with all other affected parties. Task 7. Submission of a preliminary design report to the Council. Task 8. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

  9. Communication by Design: A Collaborative Project for Student Choreographers and Costume Designers

    Science.gov (United States)

    McLaine, Gretchen; McCabe, Janine

    2013-01-01

    This article describes Communication by Design, a year-long project developed to foster an important dialogue between emerging student costume designers and student choreographers. Two university professors, one teaching costume design and one teaching dance, collaborated to help their students gain an understanding of how these two disciplines…

  10. Designing pilot projects as boundary objects a Brazilian case study in the promotion of sustainable design

    CERN Document Server

    Zurlo, Francesco

    2016-01-01

    This book describes a collaborative Design Pilot Project held in Brazil (called MODU.Lares) involving micro and small enterprises and other actors in the furniture sector. The experience was based on an action research method and evaluated by using a tool, in order to assess the value of pilot project as a boundary object capable of fostering innovation and sustainability. The impact of the Design Pilot Project in triggering change in a fragmented local system with a poor environmental and social record, as well as management and innovation issues, were assessed with the help of the same tool, taking into account environmental, technological, economic, sociocultural, and organizational indicators. The collaborative network established was chiefly based on four elements: prototypes, meetings, exhibitions and the Pilot Project (as an overall process). The results indeed demonstrate that a Design Pilot Project can be a valid instrument for establishing a collaborative environment that promotes sustainability an...

  11. Brand ONLY Ex-Senior Designer Signs Project with Jintian

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    @@ On the afternoon of Aug.24th,Aurelien LecouE an ex-senior designer of the famous brand ONLY,appears at a news conference in Shanghai to attend signing ceremony for his design consulting service project with his client,Mr.Zhai Fangping,president of Shandong Jintian Trading Company that is situated in Zaozhuang city,one of the most important clothing export bases in China.

  12. Plutonium Immobilization Project System Design Description for Can Loading System

    Energy Technology Data Exchange (ETDEWEB)

    Kriikku, E.

    2001-02-15

    The purpose of this System Design Description (SDD) is to specify the system and component functions and requirements for the Can Loading System and provide a complete description of the system (design features, boundaries, and interfaces), principles of operation (including upsets and recovery), and the system maintenance approach. The Plutonium Immobilization Project (PIP) will immobilize up to 13 metric tons (MT) of U.S. surplus weapons usable plutonium materials.

  13. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  14. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    Energy Technology Data Exchange (ETDEWEB)

    OLGUIN, L.J.

    2000-09-25

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work.

  15. Exploiting Open-source Projects to Study Software Design

    Directory of Open Access Journals (Sweden)

    Christopher P. FUHRMAN

    2007-04-01

    Full Text Available This article presents an approach to using open-source tools and open-source projects to add realistic and practical examples to a course on software design in a professional master's program of software engineering. Students are encouraged to use object-oriented, open-source software projects available on the Internet, and to analyze their design attributes using open-source tools, to hopefully improve their designs using documented design patterns and other design strategies. The proposed approach provides a variety of realistic examples for study, which can vary from semester to semester, without the instructor having to prepare complicated realistic examples or to rely on over-simplified examples in textbooks. Because the course and the approach are relatively new, a quantifiable assessment of the pedagogical approach has not been presented. However, the argument is made that realistic examples provide for better learning, and evidence is provided to show the feasibility of the approach. The instructor's role is more of a mentor than a traditional teacher, as every open-source project is different from a design perspective.

  16. Research, design and development project Myoelectric Prosthesis of Upper Limb

    International Nuclear Information System (INIS)

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  17. Facilitating an accelerated experience-based co-design project.

    Science.gov (United States)

    Tollyfield, Ruth

    This article describes an accelerated experience-based co-design (AEBCD) quality improvement project that was undertaken in an adult critical care setting and the facilitation of that process. In doing so the aim is to encourage other clinical settings to engage with their patients, carers and staff alike and undertake their own quality improvement project. Patient, carer and staff experience and its place in the quality sphere is outlined and the importance of capturing patient, carer and staff feedback established. Experience-based co-design (EBCD) is described along with the recently tested accelerated version of the process. An overview of the project and outline of the organisational tasks and activities undertaken by the facilitator are given. The facilitation of the process and key outcomes are discussed and reflected on. Recommendations for future undertakings of the accelerated process are given and conclusions drawn. PMID:24526020

  18. Design criteria Drain Rerouting Project 93-OR-EW-2

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This document contains the design criteria to be used by the architect-engineer (A--E) in the performance of Title I and II design for the Drain Rerouting Project. The Drain Rerouting project at the US Department of Energy`s (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee will provide the Y-12 Plant with the capability to reroute particular drains within buildings 9202, 9203 and 9995. Process drains that are presently connected to the storm sewer shall be routed to the sanitary sewer to ensure that any objectionable material inadvertently discharged into process drains will not discharge to East Fork Popular Creek (EFPC) without treatment. The project will also facilitate compliance with the Y-12 Plant`s National Pollutant Discharge Elimination System (NPDES) discharge permit and allow for future pretreatment of once-through coolant.

  19. Tools to Improve the Process of Engineering Design: An Analysis of Team Configuration and Project Support

    OpenAIRE

    Smith, Paige Elizabeth

    2004-01-01

    The purpose of this research was to determine how team design and project management (planning and tracking) affected planning and design performance and the people involved in the process. A laboratory study was conducted to evaluate three factors: team design (individuals versus groups of three), project support (no project support versus manual project support versus automated project support), and the engineering design life-cycle, which includes conceptual design, preliminary design, an...

  20. Evaluation of the Universal Design for Learning Projects

    Science.gov (United States)

    Cooper-Martin, Elizabeth; Wolanin, Natalie

    2014-01-01

    The Office of Shared Accountability evaluated the "Universal Design for Learning" (UDL) projects during spring 2013. UDL is an instructional framework that seeks to give all students equal opportunities to learn, by providing multiple means of representation, of action and expression, and of engagement. To inform future implementation…

  1. Assessment of Communication Competencies in Engineering Design Projects.

    Science.gov (United States)

    Brinkman, Gert W.; van der Geest, Thea M.

    2003-01-01

    Notes that reforms in engineering education have caused a shift from the traditional stand-alone courses in technical communication for engineering students towards communication training integrated in courses and design projects that allows students to develop four levels of competence. Describes three formats for integrated communication…

  2. Assessment of Communication Competencies in Engineering Design Projects

    NARCIS (Netherlands)

    Brinkman, Gert W.; Geest, van der Thea M.

    2003-01-01

    Reforms in engineering education have caused a shift from the traditional stand-alone course in technical communication for Engineering students towards communication training integrated in courses and design projects that allows students to develop four layers of competence. This shift creates oppo

  3. System design and engineering - lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, G. Maarten; Veenvliet, Karel Th.; Broenink, Jan F.

    2012-01-01

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality, it

  4. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, G. Maarten; Veenvliet, Karel Th.; Broenink, Jan F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through st

  5. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  6. ART/Ada design project, phase 1. Task 1 report: Overall design

    Science.gov (United States)

    Allen, Bradley P.

    1988-01-01

    The design methodology for the ART/Ada project is introduced, and the selected design for ART/Ada is described in detail. The following topics are included: object-oriented design, reusable software, documentation techniques, impact of Ada, design approach, and differences between ART-IM 1.5 and ART/Ada 1.0 prototype. Also, Ada generator and ART/Ada runtime systems are discussed.

  7. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    OpenAIRE

    Yi Luo

    2015-01-01

    This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP), was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design f...

  8. ISTAR: Project Status and Ground Test Engine Design

    Science.gov (United States)

    Quinn, Jason Eugene

    2003-01-01

    Review of the current technical and programmatic status of the Integrated System Test of an Airbreathing Rocket (ISTAR) project. November 2002 completed Phase 1 of this project: which worked the conceptual design of the X-43B demonstrator vehicle and Flight Test Engine (FTE) order to develop realistic requirements for the Ground Test Engine (GTE). The latest conceptual FTE and X-43B configuration is briefly reviewed. The project plan is to reduce risk to the GTE and FTE concepts through several tests: thruster, fuel endothermic characterization, engine structure/heat exchanger, injection characterization rig, and full scale direct connect combustion rig. Each of these will be discussed along with the project schedule. This discussion is limited due to ITAR restrictions on open literature papers.

  9. Performative Computation-aided Design Optimization

    Directory of Open Access Journals (Sweden)

    Ming Tang

    2012-12-01

    Full Text Available This article discusses a collaborative research and teaching project between the University of Cincinnati, Perkins+Will’s Tech Lab, and the University of North Carolina Greensboro. The primary investigation focuses on the simulation, optimization, and generation of architectural designs using performance-based computational design approaches. The projects examine various design methods, including relationships between building form, performance and the use of proprietary software tools for parametric design.

  10. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...

  11. Applying the Principles of Project Management to a Collegiate Automotive Engineering Design Project

    OpenAIRE

    Dvorkin, William Nathan

    2016-01-01

    The Hybrid Electric Vehicle Team of Virginia Tech is a collegiate automotive engineering design team that reengineers production vehicles to reduce environmental impact while maintaining vehicle marketability. The team Project Manager is responsible for coordinating high-level management and planning activities with the goal of better aligning the team with business and automotive industry practices. Project management responsibilities within the Hybrid Electric Vehicle Team are divided into ...

  12. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  13. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    International Nuclear Information System (INIS)

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 (micro)m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  14. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    Energy Technology Data Exchange (ETDEWEB)

    CARRO CA

    2010-03-09

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 {micro}m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  15. Pedagogical design for knowledge creating inquiry in customer projects

    Directory of Open Access Journals (Sweden)

    Hanni Muukkonen

    2013-09-01

    Full Text Available Two higher education courses involving students, teachers, and customers in multifaceted experiences of knowledge creation are described. The Trialogical Learning Approach (TLA provides a theoretical framework to address learning and teaching organized around authentic problems and the development of shared knowledge objects, such as reports, products, and new practices. The approach directs attention to those aspects of social interaction and artifact-mediated activities, which focus on the development of shared objects and the pursuit of novel knowledge and understanding. The roles of technology-mediation, customer involvement, and guidance in developing effective pedagogical practices for knowledge creation were addressed. It appears necessary to design sufficient open-endedness and complexity for students’ teamwork to generate unpredictable, practical, and epistemologically challenging situations. Pedagogical design for such a process has different foci in the four central phases: planning, project initiation, project execution, and presentation and evaluation. Planning and initiation are central to establishing relevance and project awareness for the collaboration of student teams with a customer. Guidance and expert modeling during project initiation and execution is needed to overcome feelings of uncertainty during a challenging and complex assignment. Mediation provided by collaboration tools facilitates reflection on collective practices, iterative development of knowledge objects, and documentation of the learning outcomes of customer projects.

  16. Wind Powering America: The Next Steps in North Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Banks, Jennifer L. [North Carolina Solar Center; Scanlin, Dennis [Appalachian State University; Quinlan, Paul [North Carolina Sustainable Energy Association

    2013-06-18

    The goal of this project is to apply the WPA’s proactive outreach strategy to the problem of educating the public about the likely transmission infrastructure developments concomitant to the significant development of wind energy resources in North Carolina. Given the lead time to develop significant new transmission infrastructure (5-10 years), it is critical to begin this outreach work today, so that wind resources can be developed to adequately meet the 20% by 2030 goal in the mid- to long-term (10-20 years). The project team planned to develop a transmission infrastructure outreach campaign for North Carolina by: (1) convening a utility interest group (UIG) of the North Carolina Wind Working Group (NC WWG) consisting of electric utilities in the state and the Southeast; and (2) expanding outreach to local and state government officials in North Carolina.

  17. CleanFleet. Volume 2, Project Design and Implementation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The CleanFleet alternative fuels demonstration project evaluated five alternative motorfuels in commercial fleet service over a two-year period. The five fuels were compressed natural gas, propane gas, California Phase 2 reformulated gasoline (RFG), M-85 (85 percent methanol and 15 percent RFG), and electric vans. Eight-four vans were operated on the alternative fuels and 27 vans were operated on gasoline as baseline controls. Throughout the demonstration information was collected on fleet operations, vehicle emissions, and fleet economics. In this volume of the CleanFleet findings, the design and implementation of the project are summarized.

  18. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Science.gov (United States)

    Luo, Yi

    2015-01-01

    This paper presents a case study examining 3rd, 4th and 5th graders' design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP), was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes.…

  19. IGCC repowering project clean coal II project public design report. Annual report, October 1992--September 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-01

    Combustion Engineering, Inc. (CE) is participating in a $270 million coal gasification combined cycle repowering project that was designed to provide a nominal 60 MW of electricity to City, Water, Light and Power (CWL&P) in Springfield, Illinois. The Integrated Gasification Combined Cycle (IGCC) system consists of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-BTU gas; and all necessary coal handling equipment, The project is currently completing the second budget period of five. The major activities to date are: (1) Establishment of a design, cost, and schedule for the project; (2) Establishment of financial commitments; (3) Acquire design and modeling data; (4) Establishment of an approved for design (AFD) engineering package; (5) Development of a detailed cost estimate; (6) Resolution of project business issues; (7) CWL&P renewal and replacement activities; and (8) Application for environmental air permits. A Project Management Plan was generated, The conceptual design of the plant was completed and a cost and schedule baseline for the project was established in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities were accomplished, including the Air Permit Application, completion of the National Environmental Policy Act process, and the draft Environmental Monitoring Plan. At the end of 1992 the DOE requested that Duke Engineering and Services Inc., (DESI) be used to complete the balance of plant cost estimate. DESI was retained to do this work, DESI completed the material take off estimate and included operations, maintenance, and startup in the estimate.

  20. Design Fixation and Cooperative Learning in Elementary Engineering Design Project: A Case Study

    Directory of Open Access Journals (Sweden)

    Yi Luo

    2015-09-01

    Full Text Available This paper presents a case study examining 3rd, 4th and 5th graders’ design fixation and cooperative learning in an engineering design project. A mixed methods instrument, the Cooperative Learning Observation Protocol (CLOP, was adapted to record frequency and class observation on cooperative learning engagement through detailed field notes. Students’ design journals and reflections were also analyzed for an inductive qualitative analysis. The findings indicate three major themes of design fixation: 1 fixation on common features of things; 2 fixation on popular teenage culture; 3 fixation on the first design idea. In the cooperative learning process of elementary engineering design project, although pupils had demonstrated some abilities to solve concrete problems in a logical fashion, the participants encountered a number of obstacles in the group. Dominance, social loafing, and other problems occurring in the group process might have offset certain benefits of cooperative learning. Implications of the findings are also discussed.

  1. Kemper County IGCC (tm) Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  2. Design basis event consequence analyses for the Yucca Mountain project

    International Nuclear Information System (INIS)

    Design basis event (DBE) definition and analysis is an ongoing and integrated activity among the design and analysis groups of the Yucca Mountain Project (YMP). DBE's are those that potentially lead to breach of the waste package and waste form (e.g., spent fuel rods) with consequent release of radionuclides to the environment. A Preliminary Hazards Analysis (PHA) provided a systematic screening of external and internal events that were candidate DBE's that will be subjected to analyses for radiological consequences. As preparation, pilot consequence analyses for the repository subsurface and surface facilities have been performed to define the methodology, data requirements, and applicable regulatory limits

  3. Geomatics engineering a practical guide to project design

    CERN Document Server

    Ogaja, Clement A

    2010-01-01

    OVERVIEWProject Design ProcessUnderstanding Project RequirementsInformation GatheringDesign ApproachesScheduling and Cost EstimatingWriting ProposalsBibliographyExercises CONTEMPORARY ISSUESStandards and SpecificationsDefinitionsApplication Modes of a StandardUnits of MeasureAccuracy versus PrecisionEquipment SpecificationsLimits of ClosureLeast Squares AnalysisMapping and GIS StandardsClassical Surveying StandardsGPS Surveying StandardsOther StandardsBibliography ExercisesProfessional and Ethical ResponsibilitiesKnow What You DoEthics and Professional Conduct Individual and Team Responsibilit

  4. Salt Repository Project shaft design guide: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    1987-12-01

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs.

  5. Salt Repository Project shaft design guide: Revision 0

    International Nuclear Information System (INIS)

    The Salt Repository Project (SRP) Shaft Design Guide (SDG) and the accompanying SRP Input to Seismic Design define the basic approach for developing appropriate shaft designs for a high-level nuclear waste repository in salt at a proposed site in Deaf Smith County, Texas. The SDG is based on current mining industry standards and practices enhanced to meet the special needs of an underground nuclear waste repository. It provides a common approach for design of both the exploratory and repository shafts. The SDG defines shaft lining and material concepts and presents methods for calculating the loads and displacements that will be imposed on lining structures. It also presents the methodology and formulae for sizing lining components. The SDG directs the shaft designer to sources of geoscience and seismic design data for the Deaf Smith County, Texas repository site. In addition, the SDG describes methods for confirming shaft lining design by means of computer analysis, and it discusses performance monitoring needs that must be considered in the design. 113 refs., 18 figs., 14 tabs

  6. Architectural Design Quality in Local Authority Private Finance Initiative Projects

    OpenAIRE

    Giddings, Bob; Sharma, Monika; Jones, Paul; Jensen, Phil

    2010-01-01

    Since the 1990s, when the Private Finance Initiative was developed as the primary method for delivering major public capital projects, there has been concern about the quality of many of the products. Initially, it was the architectural community that raised doubts, but it has subsequently been joined by user groups. As the contractual period is over 30 years, there are issues such as ongoing maintenance, facilities management and operational factors, that need to be balanced with design qual...

  7. Designing CDIO capstone projects: a systems thinking approach

    OpenAIRE

    Alarcón Cot, Eduardo José; Bou Balust, Elisenda; Camps Carmona, Adriano José; Bragós Bardia, Ramon; Oliveras Vergés, Albert; Pegueroles Vallés, Josep R.; Sayrol Clols, Elisa; Marqués Acosta, Fernando

    2013-01-01

    Given the all-pervasiveness of Systems thinking -which consists of thinking about things as systemsas a way of reasoning, in this work we will describe its application to make an interpretation of how to conceive and design a final year CDIO capstone course. Both the student teamwork structure as well as the complex engineering system itself addressed in the project are described in terms of entities, links, form and function, thereby pointing out their formal and functional inter...

  8. Carolinas Communication Annual, 1998.

    Science.gov (United States)

    McLennan, David B.

    1998-01-01

    This 1998 issue of "Carolinas Communication Annual" contains the following articles: "Give Me That Old Time Religion?: A Study of Religious Themes in the Rhetoric of the Ku Klux Klan" (John S. Seiter); "The Three Stooges versus the Third Reich" (Roy Schwartzman); "Interdisciplinary Team Teaching: Implementing Collaborative Instruction in an…

  9. Wabash River coal gasification repowering project: Public design report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Wabash River Coal Gasification Repowering Project (the Project), conceived in October of 1990 and selected by the US Department of Energy as a Clean Coal IV demonstration project in September 1991, is expected to begin commercial operations in August of 1995. The Participants, Destec Energy, Inc., (Destec) of Houston, Texas and PSI Energy, Inc., (PSI) of Plainfield, Indiana, formed the Wabash River Coal Gasification Repowering Project Joint Venture (the JV) to participate in the DOE`s Clean Coal Technology (CCT) program by demonstrating the coal gasification repowering of an existing 1950`s vintage generating unit affected by the Clean Air Act Amendments (CAAA). The Participants, acting through the JV, signed the Cooperative Agreement with the DOE in July 1992. The Participants jointly developed, and separately designed, constructed, own, and will operate an integrated coal gasification combined cycle (CGCC) power plant using Destec`s coal gasification technology to repower Unit {number_sign}1 at PSI`s Wabash River Generating Station located in Terre Haute, Indiana. PSI is responsible for the new power generation facilities and modification of the existing unit, while Destec is responsible for the coal gasification plant. The Project demonstrates integration of the pre-existing steam turbine generator, auxiliaries, and coal handling facilities with a new combustion turbine generator/heat recovery steam generator tandem and the coal gasification facilities.

  10. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Connell, Daniel P

    2009-01-12

    the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

  11. Optics Design for the U.S. SKA Technology Development Project Design Verification Antenna

    Science.gov (United States)

    Imbriale, W. A.; Baker, L.; Cortes-Medellin, G.

    2012-01-01

    The U.S. design concept for the Square Kilometer Array (SKA) program is based on utilizing a large number of 15 meter dish antennas. The Technology Development Project (TDP) is planning to design and build the first of these antennas to provide a demonstration of the technology and a solid base on which to estimate costs. This paper describes the performance of the selected optics design. It is a dual-shaped offset Gregorian design with a feed indexer that can accommodate corrugated horns, wide band single pixel feeds or phased array feeds.

  12. Creative Thinking of Practical Engineering Students During a Design Project

    Science.gov (United States)

    Waks, Shlomo; Merdler, Moti

    2003-01-01

    Creativity in engineering design had become an economic necessity and not merely the privilege of unique individuals. The search for new, innovative and effective ideas in engineering design stands in center of daily creative performance. This search requires sensitivity to gaps of knowledge and information, and the ability to evoke numerous, different and unique ideas about engineering problems. The source of such information or knowledge can be either extrinsic-such as provided by an instructor or expert or intrinsic, which might involve transformation from one field or context to another. Furthermore, interaction with an exterior source as well as developing an inherent drive, have an impact on the motivation to perform creatively. This article, which is based on a study conducted among Israeli practical engineering students, deals with the variations in creative thinking during various stages of a design project and the relation between creative thinking and motivation factors.

  13. Educational Designs Supporting Student Engagement Through Networked Project Studies

    DEFF Research Database (Denmark)

    Lerche Nielsen, Jørgen; Andreasen, Lars Birch

    2013-01-01

    The chapter discusses how learner engagement can be facilitated through educational designs that make conscious use of various online communication technologies. The discussions will be based on cases from the Danish Master’s programme in ICT and Learning (MIL), where students from all over Denmark...... Organizations, where the traditional practice of using online discussions were challenged, by expecting the students not only individually to take part in online discussions, but also on a group basis to discuss what kind of theme or opening question they would pose in order to invite co-students to take part...... in the online dialogues. Thus in contrast to the traditional understanding of the teacher as the sole designer of the learning environment, here the students were involved as active co-designers. Our understanding of problem-based learning is characterized by collaborative project work in groups...

  14. The magnet design for the HLS storage ring upgrade project

    Institute of Scientific and Technical Information of China (English)

    ZHANG Hao; LI Wei-Min; FENG Guang-Yao; WANG Lin; ZHANG Shan-Cai; LI Wei; LIANG Jun-Jun

    2012-01-01

    In order to improve the performance of the Hefei Light Source (HLS),in particular to get higher brilliance synchrotron radiation and increase the number of straight section insertion devices,an upgrade project called HLSII will be launched soon.The storage ring lattice,which has a double bend achromatic structure with four periods,comprises eight dipoles,32 quadrupoles and 32 combined function sextupoles.The design and analysis of the magnets are shown in this paper,along with the optimization of the multipurpose combined function magnet,which consists of three magnets:skew quadrupole,horizontal dipole and vertical dipole,with the main sextupole magnet.This type of magnet is the first one that has been designed and used in China.The mechanical design and fabrication procedures for the magnets are also presented.

  15. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  16. The VIADUC project: innovation in climate adaptation through service design

    Science.gov (United States)

    Corre, L.; Dandin, P.; L'Hôte, D.; Besson, F.

    2015-07-01

    From the French National Adaptation to Climate Change Plan, the "Drias, les futurs du climat" service has been developed to provide easy access to French regional climate projections. This is a major step for the implementation of French Climate Services. The usefulness of this service for the end-users and decision makers involved with adaptation planning at a local scale is investigated. As such, the VIADUC project is: to evaluate and enhance Drias, as well as to imagine future development in support of adaptation. Climate scientists work together with end-users and a service designer. The designer's role is to propose an innovative approach based on the interaction between scientists and citizens. The chosen end-users are three Natural Regional Parks located in the South West of France. The latter parks are administrative entities which gather municipalities having a common natural and cultural heritage. They are also rural areas in which specific economic activities take place, and therefore are concerned and involved in both protecting their environment and setting-up sustainable economic development. The first year of the project has been dedicated to investigation including the questioning of relevant representatives. Three key local economic sectors have been selected: i.e. forestry, pastoral farming and building activities. Working groups were composed of technicians, administrative and maintenance staff, policy makers and climate researchers. The sectors' needs for climate information have been assessed. The lessons learned led to actions which are presented hereinafter.

  17. Educational Designs Supporting Student Engagement Through Network Project Studies

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Lerche

    digital media are discussed, especially focusing on student engagement and the implications of organizing the pedagogical practice as networked project work. The discussions are based on the author’s experiences during 16 years of teaching and supervising at the Danish Master’s Program of ICT and Learning...... knowledge and recognize what you need to know. The students within this environment engage themselves in innovative ways of applying new technologies, and they are challenged to act as both independent and interconnected learners......., developed from the traditions of organizing university studies through student-driven project work and problem-driven learning approaches, which have been developed at the Danish universities of Roskilde and Aalborg as early as from the beginning of the 1970s. Specific educational designs integrating...

  18. Respiratory Protection Behavior and Respiratory Indices among Poultry House Workers on Small, Family-Owned Farms in North Carolina: A Pilot Project.

    Science.gov (United States)

    Kearney, Gregory D; Gallagher, Barbara; Shaw, Robert

    2016-01-01

    The aim of this pilot study was to evaluate respiratory behavior and respiratory indices of poultry workers on family-owned, poultry farms with 10 or less employees in North Carolina. A field study was conducted to collect data on participants (N = 24) using spirometry, fractional exhaled nitric oxide (Feno), and an interviewer-administered questionnaire. The majority of workers (76%) ranked respiratory protection as being important, yet 48% reported never or rarely wearing respiratory protection when working in dusty conditions. A large percent of workers reported eye (55%) and nasal (50%) irritation and dry cough (50%). On average, pulmonary lung function and Feno tests were normal among nonsmokers. In bivariate analysis, significant associations were identified between working 7 days on the farm (P = .01), with eye irritation, and working 5 or fewer years in poultry farming (P = .01). Poultry workers on family-owned farms spend a considerable amount of work time in poultry houses and report acute respiratory-related health symptoms. Administrative controls among small, family-owned poultry farms are necessary to improve and promote safety and health to its employees. PMID:26788985

  19. The Thirty-Meter Telescope project design and development phase

    Science.gov (United States)

    Stepp, Larry M.; Strom, Stephen E.

    2004-07-01

    The U.S. National Observatories have responded to the call of the astronomy decadal survey committee to develop a Giant Segmented Mirror Telescope by forming the AURA New Initiatives Office. Drawing on the engineering and scientific staffs of the National Optical Astronomy Observatory and the Gemini Observatory, NIO has for the past 30 months carried out studies aimed at: understanding the key science drivers for a thirty-meter telescope; developing a feasible point design that is responsive to the science goals; and identifying key technical issues that must be solved in order to successfully build such a telescope. In parallel, NIO has followed the charge of the decadal survey to identify potential private and international partners to fulfill the committee vision of a public-private partnership to build and operate this facility. NIO has now joined with two other groups -- the CELT Development Corporation (a partnership between the University of California and the California Institute of Technology) and the Association of Canadian Unviersities for Research In Astronomy (ACURA) -- to initiate the next step, the design & development (D & D) phase of a joint project that is being called the Thirty-Meter Telescope (TMT) Project. This paper reviews the plans for the TMT D & D phase, including the organizational structure, science requirements, and plans for conceptual design studies, technology development, and site selection.

  20. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  1. A Research Design for NASA-Funded Professional Development Projects

    Science.gov (United States)

    Bleicher, R. E.; Lambert, J.; Getty, S. R.

    2011-12-01

    This proposal outlines a research plan designed to measure gains in student learning resulting from their teachers participating in professional development. Project Description Misconceptions about global climate change (GCC) are prevalent in the general public (Kellstedt, Zahran, & Vedlitz, 2008; Washington & Cook, 2011). One solution is to provide high school students with a better grounding in the basic science and data that underlie GCC. The overarching goal of a NASA-funded project, Promoting Educational Leadership in Climate Change Literacy (PEL), is to increase GCC literacy in high school students. Research Design The research design is interpretative (Erickson, 2006), framed within a multi-method design, synthesizing both quantitative and qualitative data sources (Morse, 2003). Overall, the data will provide rich information about the PEL's impact on curriculum development, teacher pedagogical knowledge, and student learning. The expectancy-value theory of achievement motivation (E-V-C) (Fan, 2011; Wigfield & Eccles, 1994) provides a theoretical foundation for the research. Expectancy is the degree to which a teacher or student has reason to expect that they will be successful in school. Value indicates whether they think that performance at school will be worthwhile to them. Cost is the perceived sacrifices that must be undertaken, or factors that can inhibit, a successful performance at school. For students, data from an embedded E-V-C investigation will help articulate how E-V-C factors relate to student interest in science, continuing to study science, or embarking on STEM related careers. For teachers, the E-V-C measures will give insight into a key mediating variable on student achievement in science. The evaluation will seek to address research questions at the student and teacher levels. Table 1 presents a sample of research questions and data sources. This is a sample of a much larger set of questions that will be addressed in the project. Data

  2. U02581 Group Design Potable Water Supply - Project Brief 2007-2009

    OpenAIRE

    Crapper, Martin; Hyde, Bob

    2009-01-01

    This group design project for MEng students in the School of Engineering and Electronics is intended to introduce students to multidisciplinary planning and design. The project should develop creative thinking, team skills, and an improved understanding of other disciplines.

  3. Management approaches for improving environmental restoration at the Savannah River Site: Projectization, performance, and communications; Savannah River Site, Aiken, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Pope, J.M.; Hoffman, W.D. (Westinghouse Savannah River Co., Aiken, SC (United States)); Goidell, L. (USDOE, Washington, DC (United States))

    1993-01-01

    The purpose of this paper is to communicate how new and established management techniques are applied to environmental restoration projects at the Savannah River Site. Specifically, the paper discusses application of four (4) management approaches: Total Quality Principles; Task Team Structure; Cost Time Management; SAFER (Streamlined Approach for Environmental Restoration). The objective is to share Savannah River Site experience and document case studies where certain approaches have enhanced projects at hand. Each management approach is demonstrated by its project application and impact on performance. The visibility given the project is discussed to emphasize communications as avenues for public information, technical exchange, and employee motivation.

  4. Management approaches for improving environmental restoration at the Savannah River Site: Projectization, performance, and communications; Savannah River Site, Aiken, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Pope, J.M.; Hoffman, W.D. [Westinghouse Savannah River Co., Aiken, SC (United States); Goidell, L. [USDOE, Washington, DC (United States)

    1993-02-01

    The purpose of this paper is to communicate how new and established management techniques are applied to environmental restoration projects at the Savannah River Site. Specifically, the paper discusses application of four (4) management approaches: Total Quality Principles; Task Team Structure; Cost Time Management; SAFER (Streamlined Approach for Environmental Restoration). The objective is to share Savannah River Site experience and document case studies where certain approaches have enhanced projects at hand. Each management approach is demonstrated by its project application and impact on performance. The visibility given the project is discussed to emphasize communications as avenues for public information, technical exchange, and employee motivation.

  5. Educational Designs Supporting Student Engagement Through Networked Project Studies

    DEFF Research Database (Denmark)

    Lerche Nielsen, Jørgen; Andreasen, Lars Birch

    2013-01-01

    The chapter discusses how learner engagement can be facilitated through educational designs that make conscious use of various online communication technologies. The discussions will be based on cases from the Danish Master’s programme in ICT and Learning (MIL), where students from all over Denmark...... and interconnected learners, and discuss cases of developing student engagement through educational designs that facilitates group organized project work and learners’ participation in dialogically organized online seminars. Here we will focus on how the dimensions of participation and reification are played out....... in Organizations, where the traditional practice of using online discussions were challenged, by expecting the students not only individually to take part in online discussions, but also on a group basis to discuss what kind of theme or opening question they would pose in order to invite co-students to take part...

  6. Optical design of a 1-to-1 lithography projection

    Science.gov (United States)

    Huang, Jiun-Woei

    2016-10-01

    A 1:1 lithography projection has been designed and is fabricated for a 3D integrated circuit fabrication platform. Using a dual triplet as an initial type to form a one-to-one lens and applying a tele-centric structure, the optical common components of an optical system have been designed. The tolerance of the mechanical mounts is simulated by tilting the mounts to single and two aspheric surfaces of lens to show the degradation in the modulation transfer function; thus, the single aspheric-tilted mount in a system is suggested to reach the precision. Furthermore, Koehler illumination is used. By applying partial coherence analysis, the optimized relative numerical aperture was found. As the system is built, optimized performance should be expected.

  7. Optical design of a 1-to-1 lithography projection

    Science.gov (United States)

    Huang, Jiun-Woei

    2016-08-01

    A 1:1 lithography projection has been designed and is fabricated for a 3D integrated circuit fabrication platform. Using a dual triplet as an initial type to form a one-to-one lens and applying a tele-centric structure, the optical common components of an optical system have been designed. The tolerance of the mechanical mounts is simulated by tilting the mounts to single and two aspheric surfaces of lens to show the degradation in the modulation transfer function; thus, the single aspheric-tilted mount in a system is suggested to reach the precision. Furthermore, Koehler illumination is used. By applying partial coherence analysis, the optimized relative numerical aperture was found. As the system is built, optimized performance should be expected.

  8. Reusing open data for learning database design through project development

    Directory of Open Access Journals (Sweden)

    Jose-Norberto MAZÓN

    2015-12-01

    Full Text Available This paper describes a novel methodology based on reusing open data for applying project-based learning in a Database Design subject of a university degree. This methodology is applied to the ARA (Alto Rendimiento Académico or High Academic Performance group taught in the degree in Computer Engineering at the University of Alicante (Spain during 2012/2013, 2013/2014, and 2014/2015. Openness philosophy implies that huge amount of data is available to students in tabular format, ready for reusing. In our teaching experience, students propose an original scenario where different open data can be reused to a specific goal. Then, it is proposed to design a database in order to manage this data in the envisioned scenario. Open data in the subject helps in instilling a creative and entrepreneur attitude in students, as well as encourages autonomous and lifelong learning. Surveys made to students at the end of each year shown that reusing open data within project-based learning methodologies makes more motivated students since they are using real data.

  9. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  10. Designing “Theory of Machines and Mechanisms” course on Project Based Learning approach

    DEFF Research Database (Denmark)

    Shinde, Vikas

    2013-01-01

    by the industry and the learning outcomes specified by the National Board of Accreditation (NBA), India; this course is restructured on Project Based Learning approach. A mini project is designed to suit course objectives. An objective of this paper is to discuss the rationale of this course design...... and the process followed to design a project which meets diverse objectives....

  11. The iSAT Project Mechanical properties and designs

    KAUST Repository

    Llewellyn, Gareth

    2011-08-08

    The whale shark Rhincodon typus is the largest fish in the world. The global population of R.typus is unknown however the International Union for Conservation of Nature (IUNC) classified it as Vulnerable in 2005. To ensure a population of R.typus is maintained protection from direct fishing, by-catch and collision damage is required. To be able to enact successful protection the habitat and range of R.typus must be known. Many authors have conducted studies of R.typus in a variety of different locations and many more have reported sightings. In many locations R.typus consistently appear annually and many authors have hypothesised reasons for their appearance. What is not known however is whether these populations are isolated or inter-linked, and where these populations go when they are not at known sites. The aim of this thesis was to design the body of a vessel that could house the electronics and components designed to track an acoustic tag, survive in open ocean, and travel fast enough to keep up with R.typus allowing a long-term and high resolution track to be compiled. In order to design such a vessel many factors needed to be known. A large part of this thesis is a review of literature to conclude the most appropriate type of vessel, the average speed of R.typus, hence the required speed of the vessel, and the sea state of the Red Sea, hence the conditions the vessel would be required to survive in. It was concluded that the average speed of R.typus is 1.2 knots; the Red Sea reaches Sea State 5-6; and the most appropriate hull type for this project was a Small Waterplane Area Twin Hull (SWATH). After following a design iteration process, a final design was completed that it is believed will achieve all the required objectives.

  12. Hazardous Material / Waste Site Assessment: US 701 Bridge Replacement Project Over the Great Pee Dee River, Pee Dee River Overflow, and Lake Yauhannah Horry & Georgetown Counties, South Carolina

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This record is an unpublished report evaluating the hazardous material / waste management impacts of a future bridge replacement project on highway 701 at Yauhannah...

  13. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    International Nuclear Information System (INIS)

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL's weapons research, development, and testing (WRD ampersand T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL's inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system

  14. Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-14

    The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

  15. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  16. A Case Retrieval Projection Pursuit Model for Configuration Design of a Product Family%A Case Retrieval Projection Pursuit Model for Configuration Design of a Product Family

    Institute of Scientific and Technical Information of China (English)

    XU Zi-rong; ZHANG Yi-fei

    2011-01-01

    The paper studies on case-based reasoning of uncertain product attributes in configuration design of a product family. Interval numbers characterize uncertain product attributes. By interpolating a number of certain values randomly to replace interval numbers and making projection pursuit analysis on source cases and target cases of expanded numbers, we can get a projection value in the optimal projection direction. Based on projection value, we can construct a case retrieval model of projection pursuit that can handle coexisting certain and uncertain product attributes. The application examples of chainsaw configuration design show that case retrieval is highly sensitive to reliable results.

  17. Design and implementation of a project-based active/cooperative engineering design course for freshmen

    Science.gov (United States)

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-08-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long learning, realistic constraints and awareness of current domestic and global challenges. Throughout successive design reports and in-class assignments, the students are required by the end of the semester to communicate, clearly and concisely, the details of their design both orally and in writing through a functional artefact/prototype, a design notebook, an A0 project poster and a final oral presentation. In addition to these direct assessment tools, several indirect measures are used to ensure triangulation. Assignments are based on customer expectations using a detailed checklist. This paper shows the direct and indirect assessment tools that indicated a high level of achievement of course learning outcomes and a high level of student satisfaction.

  18. North Carolina surgical workforce trends.

    Science.gov (United States)

    Poley, Stephanie T; Kasper, Elizabeth W; Walker, Elizabeth K; Lyons, Jessica C; Newkirk, Vann R; Thompson, Kristie

    2011-01-01

    Between 1997 and 2008, the number of general surgeons in North Carolina increased and shifted demographically, geographically, and by specialty. However, surgeon numbers--overall and by specialty--do not appear to have increased as quickly or to have shifted in the same ways as North Carolina's general population.

  19. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    Energy Technology Data Exchange (ETDEWEB)

    Austad, Stephanie Lee [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  20. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    International Nuclear Information System (INIS)

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  1. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    Energy Technology Data Exchange (ETDEWEB)

    Austad, S. L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  2. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  3. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to

  4. The PEP-II Project: Low-Energy Ring Design and Project Status

    Energy Technology Data Exchange (ETDEWEB)

    Zisman, Michael S.

    2006-01-02

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later.

  5. Project Management and Coordination of Distributed Cooperative Product Design in a Virtual Enterprise

    Institute of Scientific and Technical Information of China (English)

    CAO Yan; ZHANG Ying-jie; ZHAO Ru-jia

    2004-01-01

    The architecture of project management of distributed concurrent product design in a virtual enterprise is put forward. The process of project management and its functions are presented. Product design process coordination is also discussed. First, based on the analysis of traditional project management, project management and coordination of distributed cooperative product design in the virtual enterprise is put forward. Then, aiming at the characteristics of a distributed concurrent product design process, the inherent rules and complex interrelations in product development are studied. Accordingly,the architecture of project management of distributed cooperative product design in a virtual enterprise is presented to adapt to distributed concurrent development of complex products. The main advantages of the architecture are also discussed. Finally, the emphasis is placed on the project management process.Its main functions are set forth, such as project definition, task decomposition and distribution, resource constraints and dynamic resource scheduling, process fusion, task scheduling and monitoring,project plan, cost and quality evaluation, etc.

  6. Being an Effective, Engaged Owner during a Design and Construction Project

    Science.gov (United States)

    Kalina, David

    2007-01-01

    This article explains how a project owner can be an active participant during the design and construction of his/her facility. The author discusses the two levels of participation the project owner needs to actively work with the design and construction team. And he further states that a project owner can enrich his/her personal experience and…

  7. Life's a switch. Experiences in NSF undergraduate design projects.

    Science.gov (United States)

    Popp, Stephanie A; Barnes, Jennifer R; Barrett, Steven F; Laurin, Kathy M

    2003-01-01

    During the summer of 2002 Stephanie Popp and Jennifer Barnes developed a manual, "Life's a Switch," through a project funded by the National Science Foundation. This manual teaches people how to build their own cost effective assistive switches. Assistive switches are a form of assistive technology which includes any device that enhances a person's quality of life by improving the individual's mobility, ability to perform daily activities, enhancing communication, or allowing participation in education, vocational activities and recreation. One main goal of assistive technology is to provide opportunities for children with disabilities to explore, play, learn, and communicate with others. Switches are essential tools used to provide these opportunities. When a child with developmental disabilities understands the connection between the activation of a switch and the resulting action it triggers, the knowledge of cause and effect is gained. Therefore, the basis for all future learning is established [1]. One of the current problems facing assistive switch users is the cost of available items. This project provides more affordable solutions for switch users by teaching the families and educators of switch users how to make their own switches and adaptors in the "Life's a Switch" manual. For example, some assistive technology vendors sell large button switches from $25.00 to $45.00, tread switches for $40.00, and pillow switches for $35.00 [2]. Amazingly, all parts and tools used to make these assistive switches can be bought and made into personally designed assistive devices averaging a cost of around $10.00 [3]. A workshop to teach this manual was also developed. This workshop will spread awareness of the more affordable options this project sets forth. In September of 2002, the first workshop was held in a laboratory classroom at the University of Wyoming's College of Engineering. Each attendant was provided with a kit that included all essential tools and

  8. Beyond the management and dissemination of projects' results: stakeholders involvement and project co-design

    Science.gov (United States)

    L'Astorina, Alba; Tomasoni, Irene; Basoni, Anna; Carrara, Paola

    2015-04-01

    Nowadays scientists are asked to undertake innovative and participative approaches in communicating the results of researches carried out within the various funding programs. In particular, Workpackages of Dissemination and Exploitation of results are considered mandatory at the European level helping the Project Management find innovative knowledge transfer strategies and enhance the project outcomes and impact. In this context, the involvement of stakeholders or users in research projects won a well-defined role and recent trends, in some cases, push to co-design research projects involving a pool of stakeholders or users in them from its first steps. Horizon 2020, the new EU Framework Programme for Innovation and Community financing system (2014-2020), moves clearly in this direction. CNR has an extensive experience in this kind of activity, both at the national and the international level and, in some cases, involve users and analyse their expectations using qualitative and quantitative surveys thus recognizing the role of users as research co-actors. Often products and services derived from research lack of attractiveness among enterprises, the Public Administrations and citizens, are due to the lack of an appropriate knowledge and consideration of the needs and requirements of such users. This paper intends to illustrate a case study where the analysis of the needs and requirements of the users were included in a specific Workpackage collaborating so both with the Project management and the Workpackage of Dissemination. The analysis were conducted within an ongoing project at CNR, i.e. Space4Agri (S4A): Development of Innovative Methodologies Aerospace Earth Observation in Support of the Sector agriculture in Lombardy. The main purpose of S4A is to contribute to the development of tools to improve the ability of the regional system in the planning and management of the agricultural sector Lombard, combining three domains that is scientific and technical areas

  9. On an Approach to the Design of a Logical Model of Innovation Project Data

    CERN Document Server

    Mylnikov, L; 10.3103/S0147688211030142

    2011-01-01

    Questions concerning the development of a logical model of innovation project data, as well as those concerning the design of information systems for decision?making support in the management of inno? vation projects, are discussed

  10. Characterization of storm runoff from selected South Carolina Department of Transportation maintenance yards

    Science.gov (United States)

    Conlon, Kevin J.; Reinhart, Peter J.

    2012-01-01

    The objective of this project is to collect sufficient stormwater water-quality and flow data to document the type, concentration, and event load of selected constituents transported from South Carolina Department of Transportation (SCDOT) maintenance yards by stormwater runoff.

  11. 75 FR 71680 - Duke Energy Carolinas, LLC; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2010-11-24

    ... Carolina Community Sailing & Rowing (NCCSR) Center located at Blythe Landing County Park in Cornelius, North Carolina. NCCSR will offer public sailing and rowing programs, and the proposed docking facility is designed to accommodate the specialized needs of the sailing and rowing programs. l. Locations...

  12. Supplemental design requirements document enhanced radioactive and mixed waste storage Phase V Project W-112

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, V.P.; Boothe, G.F.; Greager, T.M.; Johnson, K.D.; Kooiker, S.L.; Martin, J.D.

    1994-11-01

    This document provides additional and supplemental information to WHC-SD-W112-FDC-001, Project W-112 for radioactive and mixed waste storage. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design of the Project W-112 facilities.

  13. The DICE calibration project: design, characterization, and first results

    CERN Document Server

    Regnault, N; Schahmanèche, K; Guillou, L Le; Antilogus, P; Astier, P; Barrelet, E; Betoule, M; Bongard, S; Cuillandre, J -C; Juramy, C; Pain, R; Rocci, P -F; Tisserand, P; Villa, F

    2015-01-01

    We describe the design, operation, and first results of a photometric calibration project, called DICE (Direct Illumination Calibration Experiment), aiming at achieving precise instrumental calibration of optical telescopes. The heart of DICE is an illumination device composed of 24 narrow-spectrum, high-intensity, light-emitting diodes (LED) chosen to cover the ultraviolet-to-near-infrared spectral range. It implements a point-like source placed at a finite distance from the telescope entrance pupil, yielding a flat field illumination that covers the entire field of view of the imager. The purpose of this system is to perform a lightweight routine monitoring of the imager passbands with a precision better than 5 per-mil on the relative passband normalisations and about 3{\\AA} on the filter cutoff positions. The light source is calibrated on a spectrophotometric bench. As our fundamental metrology standard, we use a photodiode calibrated at NIST. The radiant intensity of each beam is mapped, and spectra are m...

  14. Improving project management system in R&D with human-centered design

    OpenAIRE

    Tompuri, Maiju

    2014-01-01

    Project management software aims to minimize the effort of planning and monitoring projects but these management systems can be difficult to master. In research on project management systems, the user's point of view is often neglected and the focus is on organizational success factors. This study aims to understand project managers, their needs and usage of a project management system in a research and development (R&D) organization by applying human-centered design methods. The case comp...

  15. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  16. Relative sensitivity of simulated nitrogen discharge to projected changes in climate and land cover for two watersheds in North Carolina, USA

    Science.gov (United States)

    Gabriel, M. C.; Knightes, C. D.; Cooter, E. J.; Dennis, R. L.

    2013-12-01

    We investigated the effects of projected changes in land cover and climate (precipitation, temperature and atmospheric carbon dioxide [CO2] concentrations) on simulated nitrate (NO3) and organic nitrogen (ORGN) discharge for two watersheds within the Neuse River Basin, NC for years 2010 to 2070. We applied the Soil and Water Assessment Tool (SWAT) watershed model to predict future nitrogen discharge using (1) atmospheric CO2 concentrations from the International Panel on Climate Change (IPCC), (2) land cover change predictions from the Integrated Climate and Land Use Change (ICLUS) project and (3) estimates for precipitation and temperature from two statistically downscaled and bias-corrected Global Circulation Models (GCMs). Our primary intent was to determine the sensitivity of simulated nitrogen discharge to separate changes in each treatment ([1] land cover, [2] precipitation + temperature (P+T), and [3] CO2) by comparing each treatment to a reference condition. Results showed nitrogen discharges (NO3 and ORGN) were most sensitive to changes in P+T over the 60-year simulation. Nitrogen discharges had similar sensitivities to the CO2 and land cover treatments which were only one-tenth the influence of the P+T treatment. Under the CO2 treatment, NO3 and ORGN discharges increased with increasing ambient CO2. NO3 discharge decreased with increased urbanization; however, ORGN had a varied response. Under the P+T treatment, there was high spatio-temporal variability in nitrogen discharges because of P+T's intense effect on nitrogen discharges. In a single year, certain sub-basins showed an 80% increase in nitrogen discharge relative to reference, while others showed a 400% decrease. With nitrogen discharge showing high sensitivity to P+T change, we suggest more emphasis should be placed on investigating impacts of climate change on nutrient transport compared to land cover change in the Neuse River Basin.

  17. Accounting for Epistemic and Aleatory Uncertainty in Early System Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This project extends Probability Bounds Analysis to model epistemic and aleatory uncertainty during early design of engineered systems in an Integrated Concurrent...

  18. Investigation of the Relationship between Green Design and Project Delivery Methods

    Energy Technology Data Exchange (ETDEWEB)

    Bilec, Melissa M.; Ries, Robert J.

    2008-04-24

    The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more

  19. Whither North Carolina furniture manufacturing?

    OpenAIRE

    Robert L. Lacy

    2004-01-01

    North Carolina's furniture manufacturing industry has contracted in recent years as imports have gained a greater share of the domestic furniture market. Rapid growth of the furniture industry in China and a surge in exports from that country to the United States in particular have contributed to plant closings and consolidation of operations in the state. North Carolina's furniture manufacturers are adapting to the emergence of global competition and are developing new corporate strategies t...

  20. Design and development of project planning and monitoring software

    OpenAIRE

    Grasas León, Joan

    2011-01-01

    The ever increasing importance of Project Management is justified for the necessity of companies to manage the real change in a timely and cost-effective manner. This fact has been reflected in the main Business Schools, which emphasize it in their educational programs. In this context, it is necessary to have available software based on the main concepts and techniques taught to the future business leaders. The purpose of this project is the development of a project management simulator, ...

  1. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  2. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project m...

  3. Learning Design, Social Ontology and Unintended Functionalism in Education Projects

    Science.gov (United States)

    Johnson, Mark William

    2016-01-01

    For many years there have been well-funded project opportunities for developing educational innovations, both pedagogical and technological, to fulfil the educational ambitions of national governments and European agencies. Projects have been funded on the basis of competitive bidding against themes identified by funders. Calls for funding…

  4. A Bubble Mixture Experiment Project for Use in an Advanced Design of Experiments Class

    Science.gov (United States)

    Steiner, Stefan H.; Hamada, Michael; White, Bethany J.Giddings; Kutsyy, Vadim; Mosesova, Sofia; Salloum, Geoffrey

    2007-01-01

    This article gives an example of how student-conducted experiments can enhance a course in the design of experiments. We focus on a project whose aim is to find a good mixture of water, soap and glycerin for making soap bubbles. This project is relatively straightforward to implement and understand. At its most basic level the project introduces…

  5. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  6. Development and Evaluation of an Undergraduate Multidisciplinary Project Activity in Engineering and Design

    Science.gov (United States)

    Smith, David R.; Cole, Joanne

    2012-01-01

    The School of Engineering and Design Multidisciplinary Project (MDP) at Brunel University is a one week long project based activity involving first year undergraduate students from across the School subject areas of Electronic and Computer Engineering, Mechanical Engineering, Civil Engineering and Design. This paper describes the main aims of the…

  7. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    NARCIS (Netherlands)

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose innovativ

  8. Human capital in European peripheral regions: brain - drain and brain - gain: project design [poster

    NARCIS (Netherlands)

    2004-01-01

    Project design - The action plan consists of two overlapping phases. In the initial analytic phase the specific details of brain gain/ brain drain and their underlying processes in three regions are analyzed. This is not meant as a study project but rather a method to evaluate, design and implement

  9. Rapid E-learning Development Strategies and a Multimedia Project Design Model

    Science.gov (United States)

    Sözcü, Ömer Faruk; Ipek, Ismail

    2014-01-01

    The purpose of the study is to discuss e-learning design strategies which can be used for multimedia projects as a design model. Recent advances in instructional technologies have been found to be very important in the design of training courses by using rapid instructional design (ID) approaches. The approaches were developed to use in training…

  10. Blade System Design Study. Part II, final project report (GEC).

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its

  11. Process-oriented knowledge-sharing platform for chemical engineering design projects

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    A process-oriented knowledge-sharing platform is studied to improve knowledge sharing and project management of chemical engineering design enterprises. First, problems and characteristics of knowledge sharing in multi-projects of chemical engineering design are analyzed. Then based on theories of project management, process management, and knowledge management, a process-oriented knowledge-sharing platform is proposed. The platform has three characteristics: knowledge is divided into professional knowledge...

  12. Technical Design Study for the PANDA Time Projection Chamber

    CERN Document Server

    Ball, M; Dørheim, S; Höppner, C; Ketzer, B; Konorov, I; Neubert, S; Paul, S; Rauch, J; Uhl, S; Vandenbroucke, M; Berger, M; Berger-Chen, J -C; Cusanno, F; Fabbietti, L; Münzer, R; Arora, R; Frühauf, J; Kiš, M; Leifels, Y; Kleipa, V; Hehner, J; Kunkel, J; Kurz, N; Peters, K; Risch, H; Schmidt, C J; Schmitt, L; Schwab, S; Soyk, D; Voss, B; Weinert, J; Beck, R; Kaiser, D; Lang, M; Schmitz, R; Walther, D; Bühler, P; Müllner, P; Zmeskal, J; Hermann, N

    2012-01-01

    This document illustrates the technical layout and the expected performance of a Time Projection Chamber as the central tracking system of the PANDA experiment. The detector is based on a continuously operating TPC with Gas Electron Multiplier (GEM) amplification.

  13. The design of Sri Lanka's Samanalawewa project

    Energy Technology Data Exchange (ETDEWEB)

    Back, P.A.A.; Westwell, J.R. (Sir Alexander Gibb and Partners, Reading (GB))

    1988-06-01

    Sri Lanka has both a climate and topography favourable to hydroelectricity. The largest river in the country is the Mahaweli Ganga, of which almost all the potential has now been exploited by the Kotmale, Victora, Randenigala and Rantembe (under construction) schemes. The hydro development of Sri Lanka will continue with the construction of projects on other river systems, and the Samanalawewa project on the Walawe Ganga (flowing south from the Central Highlands) is one such project now under construction. This project consists of a 100 m-high embankment dam, a 5 km-long power tunnel, a steel penstock and a surface power station with two 60 MW units. At a later stage it is planned to double the size of the powerplant and tap the flow from a tributary, which passes above the power tunnel near its downstream end. (author).

  14. Advanced conceptual design report. Phase II. Liquid effluent treatment and disposal Project W-252

    International Nuclear Information System (INIS)

    This Advanced Conceptual Design Report (ACDR) provides a documented review and analysis of the Conceptual Design Report (CDR), WHC-SD-W252-CDR-001, June 30, 1993. The ACDR provides further design evaluation of the major design approaches and uncertainties identified in the original CDR. The ACDR will provide a firmer basis for the both the design approach and the associated planning for the performance of the Definitive Design phase of the project

  15. Advanced conceptual design report. Phase II. Liquid effluent treatment and disposal Project W-252

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-31

    This Advanced Conceptual Design Report (ACDR) provides a documented review and analysis of the Conceptual Design Report (CDR), WHC-SD-W252-CDR-001, June 30, 1993. The ACDR provides further design evaluation of the major design approaches and uncertainties identified in the original CDR. The ACDR will provide a firmer basis for the both the design approach and the associated planning for the performance of the Definitive Design phase of the project.

  16. Interior Acoustic Analysis for Early Use in Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The design of an aircraft is a highly iterative process. During the conceptual design phase there is no time for developing detailed simulation models and decisions...

  17. Multi-Disciplinary Multi-Fidelity Design Environment Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To meet the design challenges of tomorrow, NASA and industry require advancements in the state-of-the-art for physics-based design and analysis frameworks. In...

  18. Designer's Situation Awareness Toolbox (DeSAT) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR will develop a design decision support tool that will assist designers in providing a powerful, supportive work environment for aviation crews that...

  19. Multidisciplinary Design Under Uncertainty for Entry Vehicles Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The physical difficulty of designing entry vehicles originates from the large degree of coupling between the various disciplines involved in the design. Every...

  20. Designing Citizen Science Projects in the Era of Mega-Information and Connected Activism

    Science.gov (United States)

    Pompea, S. M.

    2010-12-01

    The design of citizen science projects must take many factors into account in order to be successful. Currently, there are a wide variety of citizen science projects with different aims, audiences, reporting methods, and degrees of scientific rigor and usefulness. Projects function on local, national, and worldwide scales and range in time from limited campaigns to around the clock projects. For current and future projects, advanced cell phones and mobile computing allow an unprecedented degree of connectivity and data transfer. These advances will greatly influence the design of citizen science projects. An unprecedented amount of data is available for data mining by interested citizen scientists; how can projects take advantage of this? Finally, a variety of citizen scientist projects have social activism and change as part of their mission and goals. How can this be harnessed in a constructive and efficient way? The design of projects must also select the proper role for experts and novices, provide quality control, and must motivate users to encourage long-term involvement. Effective educational and instructional materials design can be used to design responsive and effective projects in a more highly connected age with access to very large amounts of information.

  1. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  2. Real World Projects in an Advanced Instructional Design Course

    Science.gov (United States)

    Tracey, Monica W.; Chatervert, Lake, Kristy; Wilson, Robert

    2008-01-01

    This design case focuses on the redesign of Advanced Instructional Design, a capstone course taught in a Midwestern university's Masters of Training and Development program. The goal of the course was to have students integrate knowledge and skills from previous courses including needs assessment, introduction to instructional design, and program…

  3. Design for Thinking: Engagement in an Innovation Project

    Science.gov (United States)

    Benson, Joy; Dresdow, Sally

    2015-01-01

    This article discusses the use of design thinking in an undergraduate decision-making course. The spaces of design are linked to the dimensions of liberal learning in a way that allows students to engage in the design of an organization that supports a new product created in a collaborative team. The article provides an overview of how the…

  4. Preliminary design review report for K Basin Dose Reduction Project

    International Nuclear Information System (INIS)

    The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design

  5. Recognizing risk-of-failure in communication design projects

    OpenAIRE

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project’s launch. This makes the design team’s ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design group IDEO, that sometimes you must “fail early to succeed early.” This paper presents the methods and strategies used by the Centre for Design Rese...

  6. Perceptions of Leadership Behaviors by Female Principals in North Carolina

    Science.gov (United States)

    McFadden, Cheryl; Maahs-Fladung, Cathy; Beck-Frazier, Susan; Bruckner, Kermit

    2009-01-01

    This study was designed to investigate whether significant differences exist among the perceptions of leadership behaviors of female principals in North Carolina using Bolman and Deal's (1984) four frames (structural, human resource, political, and symbolic) for analysis. Participants consisted of 1,245 female principals from elementary,middle,…

  7. Salt Repository Project input to seismic design: Revision 0

    International Nuclear Information System (INIS)

    The Salt Repository Program (SRP) Input to Seismic Design (ISD) documents the assumptions, rationale, approaches, judgments, and analyses that support the development of seismic-specific data and information to be used for shaft design in accordance with the SRP Shaft Design Guide (SDG). The contents of this document are divided into four subject areas: (1) seismic assessment, (2) stratigraphy and material properties for seismic design, (3) development of seismic design parameters, and (4) host media stability. These four subject areas have been developed considering expected conditions at a proposed site in Deaf Smith County, Texas. The ISD should be used only in conjunction with seismic design of the exploratory and repository shafts. Seismic design considerations relating to surface facilities are not addressed in this document. 54 refs., 55 figs., 18 tabs

  8. Power supply projects a collection of innovative and practical design projects

    CERN Document Server

    Maplin

    1996-01-01

    Using circuit diagrams, PCB layouts, parts lists and clear construction and installation details, this book provides everything someone with a basic knowledge of electronics needs to know in order to put that knowledge into practice.This latest collection of Maplin projects are a variety of power supply projects, the necessary components for which are readily available from the Maplin catalogue or any of their high street shops. Projects include, laboratory power supply projects for which there are a wide range of applications for the hobbyist, from servicing portable audio and video equipment

  9. Enhancing learning on a first year engineering programme with a student design project

    OpenAIRE

    O'Dwyer, Aidan

    2008-01-01

    This contribution reports on, and evaluates, the use of a design project for enhancing student learning on a first year module in electrical engineering at Dublin Institute of Technology. The project objective, as outlined to the students, was to design and build a, possibly innovative, everyday device that can generate electricity from sources of “free energy”, so as to encourage first year engineering students to use their natural design creativity in a freeform, brainstorming manner. The p...

  10. Development of a project level performance measurement model for improving collaborative design team work.

    OpenAIRE

    Yin, Yuanyuan; Qin, Shengfeng; Holland, Ray

    2008-01-01

    This research explored a new direction of improving collaborative design by performance measurement. More specifically, a novel 3-dimensional performance measurement model is developed and the purpose of this model is to help project managers improve team collaboration by indicating strengths and weaknesses of team members during the project development process. Considering the complexity of collaborative design work, a multiple criteria model is proposed to reflect the design dynamics, which...

  11. Green Project System Design of Machine Process Factory

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    As the specialty of the product and the dim conscio us ness of environmental protection, the status of dirty, chaos and difference is l ong-term existed in the machine process factory. It seriously affects workers' work and living environment, and restricts the total level of the environment p rotection in our country. The project is the fatal scientific research task of H enan province in 2001. As the members' endeavor of task group, we have finished the total plan of green project system and some other ...

  12. Integrated Computational System for Electrochemical Device Design and Simulation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Illinois Rocstar LLC proposes to develop and demonstrate the use of an integrated computational environment and infrastructure for electrochemical device design and...

  13. New Combustion CFD Algorithms Designed for Rapid GPU Computations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose development of new algorithms specifically designed to exploit the highly parallel structure of graphics processing units (GPUs) for performing the...

  14. Multi-Disciplinary Multi-Fidelity Design Environment Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Phoenix Integration will develop a collaborative simulation and design environment that will seamlessly integrate the people, data, and tools required for analyzing...

  15. Cube/Small Satellite Antenna Design and Performance Optimization Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This IRAD proposal investigates and proposes different small, efficient, low cost, reliable, and robust antenna design concepts with stable electrical and radiation...

  16. Computational Wind Tunnel: A Design Tool for Rotorcraft Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Rotorcraft engineers traditionally use the wind tunnel to evaluate and finalize designs. Insufficient correlation between wind tunnel results and flight tests, have...

  17. Computational Wind Tunnel: A Design Tool for Rotorcraft Project

    Data.gov (United States)

    National Aeronautics and Space Administration — During initial design studies, parametric variation of vehicle geometry is routine. In addition, rotorcraft engineers traditionally use the wind tunnel to evaluate...

  18. Case -cohort design in practice - experiences from the MORGAM Project

    OpenAIRE

    Kulathinal, S.; Karvanen, J.; Saareka, O.; K. Kuulasmaa; Evans, Alun; Yarnell, John

    2007-01-01

    When carefully planned and analysed, the case-cohort design is a powerful choice for follow-up studies with multiple event types of interest. While the literature is rich with analysis methods for case-cohort data, little is written about the designing of a case-cohort study. Our experiences in designing, coordinating and analysing the MORGAM case-cohort study are potentially useful for other studies with similar characteristics. The motivation for using the case-cohort design in the MORGAM g...

  19. Organization Design for Dynamic Fit: A Review and Projection

    Directory of Open Access Journals (Sweden)

    Mark Nissen

    2014-08-01

    Full Text Available The concept of fit is central to organization design. In the organizational literature, fit historically has been portrayed as a static concept. Both organizations and their environments, however, are continually changing, so a valid concept of fit needs to reflect organizational dynamics. In this article, I analyze various theoretical perspectives and studies that relate to organizational fit, differentiating those that employ an equilibrating or a fluxing approach. Four substantive themes emerge from this analysis: design orientation, design tension, designer/manager roles, and measurement and validation. Implications of each of these themes for dynamic fit are derived, and promising future research directions are discussed.

  20. Structural-Acoustic Simulations in Early Airframe Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The structural design during the early development of an aircraft focuses on strength, fatigue, corrosion, maintenance, inspection, and manufacturing. Usually the...

  1. Aircraft Structural Analysis, Design Optimization, and Manufacturing Tool Integration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Innovative research is proposed in integrating fundamental aircraft design processes with an emphasis on composite structures. Efficient, lightweight composite...

  2. Re-designing project management: Steps towards a project management curriculum for a sustainable built environment

    NARCIS (Netherlands)

    Heintz, J.L.; Lousberg, L.H.M.J.; Prins, M.

    2015-01-01

    Sustainability concerns add a wide range of both stakeholders and performance expectations to building projects. The transition of a circular economy will also have a significant impact on the way in which building projects are carried out. This in addition to an already established escalation of st

  3. Floods of the Past, Design of Tomorrow - Project Introduction

    NARCIS (Netherlands)

    Cohen, K.M.; Schielen, R.; van der Meulen, B.; Bomers, Anouk; Hulscher, S.J.M.H.; Middelkoop, H.

    2016-01-01

    A joint research project (two PhD’s, 2016-2020) has been granted to Utrecht University and the University of Twente, on the topic of detailed hydraulic modelling of selected largest-known historic river floods affecting the Lower Rhine valley and delta (The Netherlands and adjacent Germany). Besides

  4. Projective synchronization of chaotic systems via backstepping design

    Directory of Open Access Journals (Sweden)

    Anindita Tarai

    2012-08-01

    Full Text Available Chaos synchronization of discrete dynamical systems are investigated. An algorithm is proposed for projective synchronization of chaotic 2D Duffing map and chaotic Tinkerbell map. The control law was derived from the Lyapunov stability theory. The numerical simulation results are presented to verify the effectiveness of the proposed algorithm.

  5. Design status of the Delfi-Next nanosatellite project

    NARCIS (Netherlands)

    Bouwmeester, J.; Brouwer, G.F.; Gill, E.K.A.; Monna, G.L.E.; Rotteveel, J.

    2010-01-01

    Delfi-Next is the second project within the Delfi nanosatellite development program of Delft University of Technology. It will provide students hands-on experience, facilitate technology demonstration for innovative miniaturized space technology from the Dutch space sector and allow advancements in

  6. Cultural Analysis of Designing in International Contraction Projects

    Institute of Scientific and Technical Information of China (English)

    王尚雪

    2011-01-01

    In this paper,the author takes personal experience as an example to analyze the cultural differences and their influencesin designing phrase of international contraction projecm,which are the main differences in the translation of design codes and esthetic requirements.

  7. Analysis Report Project: Audience, E-writing, and Information Design.

    Science.gov (United States)

    Lawrence, Sally F.

    2003-01-01

    Presents students with the opportunity to evaluate e-writing techniques and information design components of two financial and investment Websites. Discusses strategies for teaching e-writing. Uses a three-part information design model developed by Carliner (2000). Discusses how the physical, cognitive, and affective aspects all work…

  8. Shippingport Spent Fuel Canister (SSFC) Design Report Project W-518

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.M.

    2000-01-27

    The SSFC Design Report Describes A spent fuel canister for Shippingport Core 2 blanket fuel assemblies. The design of the SSFC is a minor modification of the MCO. The modification is limited to the Shield Plug which remains unchanged with regard to interfaces with the canister shell. The performance characteristics remain those for the MCO, which bounds the payload of the SSFC.

  9. Design of an Extended Image Field Soft-X-Ray Projection System

    NARCIS (Netherlands)

    Voorma, H. J.; F. Bijkerk,

    1992-01-01

    A soft-x-ray projection system has been designed, which consists of spherical components to be coated with multilayer reflection coatings. In the design, a two-mirror system and a spherical reflection mask, the optical aberrations were minimized. The design enables a resolution of sub-100 nm over a

  10. A Project-Based Learning Approach to Programmable Logic Design and Computer Architecture

    Science.gov (United States)

    Kellett, C. M.

    2012-01-01

    This paper describes a course in programmable logic design and computer architecture as it is taught at the University of Newcastle, Australia. The course is designed around a major design project and has two supplemental assessment tasks that are also described. The context of the Computer Engineering degree program within which the course is…

  11. Nature-inspired design strategies in sustainable product development: A case study of student projects

    NARCIS (Netherlands)

    De Pauw, I.C.; Karana, E.; Kandachar, P.V.

    2012-01-01

    In design practice, Nature-Inspired Design Strategies (NIDS) can be applied when developing sustainable products. However, knowledge on how this actually helps designers is lacking. This study explores the effects of applying Cradle to Cradle and Biomimicry in student projects, as compared to using

  12. The design explorer project: Using a cognitive framework to support knowledge exploration

    DEFF Research Database (Denmark)

    Pejtersen, A. M.; Sonnenwald, D.H.; Buur, J.;

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process...... industries, manufacturing, hospitals and libraries....

  13. Low Thrust Trajectory Design for GSFC Missions Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The problem to be solved here is that of designing complex interplanetary trajectories to destinations which are difficult to reach via direct flights and chemical...

  14. Architecture Framework for Fault Management Assessment And Design (AFFMAD) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Architecture Framework for Fault Management Assessment And Design (AFFMAD) is a constraint-checking system for FM trade space exploration that provides rigorous...

  15. High-Fidelity Aerodynamic Design with Transition Prediction Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To enhance aerodynamic design capabilities, Desktop Aeronautics proposes to combine a new sweep/taper integrated-boundary-layer (IBL) code that includes transition...

  16. School of Architecture + Design collaborates in "green museum" project

    OpenAIRE

    Chadwick, Heather Riley

    2007-01-01

    The Virginia Tech School of Architecture + Design, the nation's number one ranked public institution for undergraduate architecture, will be collaborating with the Shenandoah Valley Discovery Museum in Winchester, Va, in the creation of a new, green museum facility.

  17. Engine Test Stand Design Constraints Expert System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Propulsion test stands are designed for thermal and pressure loads for certain classes of engines. These plume induced loads are: radiative heating, acoustics and...

  18. Automated Computational Fluid Dynamics Design With Shape Optimization Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Computational fluid dynamics (CFD) is used as an analysis tool to help the designer gain greater understanding of the fluid flow phenomena involved in the...

  19. High-Fidelity Aerodynamic Design with Transition Prediction Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To enhance aerodynamic design capabilities, Desktop Aeronautics proposes to significantly improve upon the integration (performed in Phase 1) of a new sweep/taper...

  20. Design and Simulation Tools for Planetary Atmospheric Entry Vehicles Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Atmospheric entry is one of the most critical phases of flight during planetary exploration missions. During the design of an entry vehicle, experimental and...

  1. Design and Analysis Tools for Deployable Solar Array Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Large, lightweight, deployable solar array structures have been identified as a key enabling technology for NASA with analysis and design of these structures being...

  2. Electronic Modeling and Design for Extreme Temperatures Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We are developing CAD tools, models and methodologies for electronics design for circuit operation in extreme environments with focus on very low temperatures...

  3. KiloPower Project - KRUSTY Experiment Nuclear Design

    Energy Technology Data Exchange (ETDEWEB)

    Poston, David Irvin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Godfroy, Thomas [NASA Marshall Space Flight Center (MSFC), Huntsville, AL (United States); Mcclure, Patrick Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Sanchez, Rene Gerardo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-20

    This PowerPoint presentation covers the following topics: Reference Kilopower configuration; Reference KRUSTY configuration; KRUSTY design sensitivities; KRUSTY reactivity coefficients; KRUSTY criticality safety and control; KRUSTY core activation/dose; and KRUSTY shielding, room activation/dose.

  4. Advanced Control System Design for Hypersonic Vehicles Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Guidance and control system design for hypersonic vehicles is more challenging than their subsonic and supersonic counterparts. Some of these challenges are (i)...

  5. Mechanical Engineering Design Project report: Enabler control systems

    Science.gov (United States)

    Cullen, Christian; Delvecchio, Dave; Scarborough, Alan; Havics, Andrew A.

    1992-01-01

    The Controls Group was assigned the responsibility for designing the Enabler's control system. The requirement for the design was that the control system must provide a simple user interface to control the boom articulation joints, chassis articulation joints, and the wheel drive. The system required controlling hydraulic motors on the Enabler by implementing 8-bit microprocessor boards. In addition, feedback to evaluate positions and velocities must be interfaced to provide the operator with confirmation as well as control.

  6. Organic agriculture in North Carolina

    NARCIS (Netherlands)

    Wossink, G.A.A.; Kuminoff, N.

    2002-01-01

    This issue of the NC State Economist provides an overview of organic agriculture with an emphasis on North Carolina. Research results are reported and some of the new policies and programs that may affect organic agriculture in the near future are described

  7. Mechanical Design Engineering Enabler Project wheel and wheel drives

    Science.gov (United States)

    Nutt, Richard E.; Couch, Britt K.; Holley, John L., Jr.; Garris, Eric S.; Staut, Paul V.

    1992-01-01

    Our group was assigned the responsibility of designing the wheel and wheel drive system for a proof-of-concept model of the lunar-based ENABLER. ENABLER is a multi-purpose, six wheeled vehicle designed to lift and transport heavy objects associated with the construction of a lunar base. The resulting design was based on the performance criteria of the ENABLER. The drive system was designed to enable the vehicle to achieve a speed of 7 mph on a level surface, climb a 30 percent grade, and surpass a one meter high object and one meter wide crevice. The wheel assemblies were designed to support the entire weight of the vehicle on two wheels. The wheels were designed to serve as the main component of the vehicle's suspension and will provide suitable traction for lunar-type surfaces. The expected performance of the drive system for the ENABLER was influenced by many mechanical factors. The expected top speed on a level sandy surface is 4 mph instead of the desired 7 mph. This is due to a lack of necessary power at the wheels. The lack of power resulted from dimension considerations that allowed only an eight horsepower engine and also from mechanical inefficiencies of the hydraulic system. However, the vehicle will be able to climb a 30 percent grade, surpass a one meter high object and one meter wide crevice. The wheel assemblies will be able to support the entire weight of the vehicle on two wheels. The wheels will also provide adequate suspension for the vehicle and sufficient traction for lunar-type surfaces.

  8. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  9. Accreditation and Participatory Design: An Effects-Driven Road to Quality Development Projects

    DEFF Research Database (Denmark)

    Simonsen, Jesper; Scheuer, John Damm

    This paper presents a soft project management paradigm approach based on participatory design to assuring values and benefits in public projects. For more than a decade, quality development in the Danish healthcare sector has been managed with an accreditation system known as the Danish Quality......-driven IT development and suggest how this approach may form a cornerstone of project management in a new quality-assurance program for the Danish healthcare sector....

  10. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  11. iPhone Design Award-Winning Projects

    CERN Document Server

    Dannen, Chris

    2010-01-01

    This book profiles developers who have received the prestigious Apple Design Award for iPhone app excellence. You'll learn all about what makes these apps truly standout, including explanations of great user interface design and implementation, as well as the code under the hood that makes these the most responsive, intuitive, useful, and just plain fun apps running on the iPhone. * Insightful profiles of the developers behind Tweetie, Topple 2, AccuTerra, Postage, and Wooden Labyrinth 3D* Detailed explanations of the technical wizardry that makes these apps tick* Full-color screenshots and co

  12. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...

  13. A biotic game design project for integrated life science and engineering education.

    Directory of Open Access Journals (Sweden)

    Nate J Cira

    2015-03-01

    Full Text Available Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course. We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games.

  14. A biotic game design project for integrated life science and engineering education.

    Science.gov (United States)

    Cira, Nate J; Chung, Alice M; Denisin, Aleksandra K; Rensi, Stefano; Sanchez, Gabriel N; Quake, Stephen R; Riedel-Kruse, Ingmar H

    2015-03-01

    Engaging, hands-on design experiences are key for formal and informal Science, Technology, Engineering, and Mathematics (STEM) education. Robotic and video game design challenges have been particularly effective in stimulating student interest, but equivalent experiences for the life sciences are not as developed. Here we present the concept of a "biotic game design project" to motivate student learning at the interface of life sciences and device engineering (as part of a cornerstone bioengineering devices course). We provide all course material and also present efforts in adapting the project's complexity to serve other time frames, age groups, learning focuses, and budgets. Students self-reported that they found the biotic game project fun and motivating, resulting in increased effort. Hence this type of design project could generate excitement and educational impact similar to robotics and video games. PMID:25807212

  15. Model-Based Design Tools for Extending COTS Components To Extreme Environments Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The innovation in this project is model-based design (MBD) tools for predicting the performance and useful life of commercial-off-the-shelf (COTS) components and...

  16. The Design and Integration of a Distributed Fan Propulsion System within a Split-Wing Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A baseline propulsion system has been designed as a starting point in a previous SBIR effort for this project which consists of two turboshaft engines, a generator...

  17. Innovative Structural and Material Concepts for Low-Weight Low-Drag Aircraft Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall objective of this multi-phase project is to explore, develop, integrate, and test several innovative structural design concepts and new material...

  18. Model-Based Design Tools for Extending COTS Components To Extreme Environments Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The innovation in this Phase I project is to prove the feasibility of using model-based design (MBD) tools to predict the performance and useful life of...

  19. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  20. Implementing a Student-Designed Green Chemistry Laboratory Project in Organic Chemistry

    Science.gov (United States)

    Graham, Kate J.; Jones, T. Nicholas; Schaller, Chris P.; McIntee, Edward J.

    2014-01-01

    A multiweek organic chemistry laboratory project is described that emphasizes sustainable practices in experimental design. An emphasis on student-driven development of the project is meant to mirror the independent nature of research. Students propose environmentally friendly modifications of several reactions. With instructor feedback, students…

  1. A Project Designed to Increase Exceptional Child Services to Northeast Alabama.

    Science.gov (United States)

    Frith, Greg

    Project Outreach was designed to increase exceptional child services to 14 rural school systems. In order to attract special education teachers to rural areas, the Project conducted in-service training sessions at eight Local Education Agencies aimed at the needs of the graduate level teacher from the Appalachian area of Northeast Alabama. In…

  2. An Evaluation of a Group Project Designed to Reduce Free-Riding and Promote Active Learning

    Science.gov (United States)

    Swaray, Raymond

    2012-01-01

    Group projects are recognised as effective means of engaging students with work-related skills and promoting cooperative learning. This paper reports findings of a small survey--a group project designed to reduce problems associated with the process of production of group goods and services: free-riding and monitoring participation level. The…

  3. Efficient methods for solving discrete topology design problems in the PLATO-N project

    DEFF Research Database (Denmark)

    Canh, Nam Nguyen; Stolpe, Mathias

    This paper considers the general multiple load structural topology design problems in the framework of the PLATO-N project. The problems involve a large number of discrete design variables and were modeled as a non-convex mixed 0–1 program. For the class of problems considered, a global optimizat......This paper considers the general multiple load structural topology design problems in the framework of the PLATO-N project. The problems involve a large number of discrete design variables and were modeled as a non-convex mixed 0–1 program. For the class of problems considered, a global...

  4. Developing 21st Century Process Skills through Project Design

    Science.gov (United States)

    Yoo, Jeong-Ju; MacDonald, Nora M.

    2014-01-01

    The goal of this paper is to illustrate how the promotion of 21st Century process skills can be used to enhance student learning and workplace skill development: thinking, problem solving, collaboration, communication, leadership, and management. As an illustrative case, fashion merchandising and design students conducted research for a…

  5. Introducing Project-Based Learning to Design Enterprises for Creativity

    DEFF Research Database (Denmark)

    Wang, Feng; Zhou, Chunfang; Chen, Hongbing

    2013-01-01

    has at least two elements including solving real problems and group work that can provide conditions of creativity development. Moreover, creativity techniques such as brainstorming, mind mapping, checklist and morphological analysis are suggested to be integrated into PBL in the design enterprises....

  6. Involving Assessment Buddies in the Assessment of Design Project Work

    Science.gov (United States)

    Osmond, Jane; Clough, Brian

    2012-01-01

    This paper discusses the impact of a specially developed assessment and feedback system implemented within a second year industrial design module at Coventry University, UK. The "Assessment Buddy" system was developed in response to the need for a successful assessment and feedback method that could cope with the complexities of a creative…

  7. Assessing Student Design Work in Social Entrepreneurship Projects

    OpenAIRE

    Nelson, Lindsey Anne

    2013-01-01

    Helping People Living in Poverty? Understanding Factors Motivating Social Entrepreneurship Abstract Increasingly, engineering educators look to increase the social relevance of engineering design activities. The emergence of social businesses has sparked interest in creating programs that teach engineers about social entrepreneurship. Social businesses are viable business ventures where businesses adopt a social mission. Some strategists view social businesses as ways to capture market share ...

  8. Design and Implementation of a Biologically Inspired Flying Robot - An EPS@ISEP 2014 Spring Project

    OpenAIRE

    Caramin, Bénédicte Anki; Dunn, Iain; Ney, Rauno; Klawikowski, Yvonne; Malheiro, Benedita; Ribeiro, Maria Cristina; Silva, Manuel; Caetano, Nídia de Sá; Ferreira, Paulo; Guedes, Pedro

    2015-01-01

    The goal of this EPS@ISEP project proposed in the Spring of 2014 was to develop a flapping wing flying robot. The project was embraced by a multinational team composed of four students from different countries and fields of study. The team designed and implemented a robot inspired by a biplane design, constructed from lightweight materials and battery powered. The prototype, called MyBird, was built with a 250 € budget, reuse existing materials as well as low cost solutio...

  9. Facilitating Value Creation and Delivery in Construction Projects:New Vistas for Design Management

    OpenAIRE

    Thyssen, Mikael Hygum; Bonke, Sten; Emmitt, Stephen; Christoffersen, Anders Kirk

    2011-01-01

    This thesis is about value creation in the early stages of construction design processes. It has been problem-driven with a specific management concept, the workshop model, as an outset. Essentially the question was; how should construction project design processes be managed with the objective of maximizing client and user value? To this end the research project can be seen as an effect of a current management discourse, where customer value is the slogan. However, in an academic context, su...

  10. Conceptual design report for tank farm restoration and safe operations, project W-314

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  11. Human capital in European peripheral regions: brain - drain and brain - gain: project design [poster

    OpenAIRE

    2004-01-01

    Project design - The action plan consists of two overlapping phases. In the initial analytic phase the specific details of brain gain/ brain drain and their underlying processes in three regions are analyzed. This is not meant as a study project but rather a method to evaluate, design and implement brain drain gain instruments through a thorough analysis of processes. The implementation phase deals with the development, implementation and evaluation of instruments as well as the dissemination...

  12. The practical design method: a software design method for a first object oriented project

    OpenAIRE

    Jorge L. Ortega Arjona

    2005-01-01

    Commercial object-oriented design methods are often complicated and hard to learn and use. This paper presents a software design method that is a pragmatic and simple approach to designing object-oriented applications. It is based on the fundamental principles of object-oriented design: objects and their cooperation. Design process descriptions are described, considering modeling notations, as well as steps from collecting customer requirements to implementing code. The design method includes...

  13. Examination of Assessment Practices for Engineering Design Projects in Secondary Education (Part 2)

    OpenAIRE

    Kelley, Todd R.; Wicklein, Robert C.

    2009-01-01

    There is a growing interest in the topic of engineering design for technology education. At the 2007 and 2008 International Technology Education Association (ITEA) conference held in San Antonio, over 80 presentations were related to engineering topics. Further evidence of the influence and impact of engineering design content comes from the large number of well documented curriculum projects designed to infuse engineering content into technology education such as Engineering by Design; Proje...

  14. Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Piros, Attila, E-mail: attila.piros@gt3.bme.hu [Department of Machine and Product Design, Budapest University of Technology and Economics, Budapest (Hungary); Veres, Gábor [Department of Plasma Physics, Wigner Research Centre for Physics, Hungarian Academy of Sciences, Budapest (Hungary)

    2013-10-15

    The long-term design projects need special preparation before the start of the execution. This preparation usually includes the drawing of the network diagram for the whole procedure. This diagram includes the time estimation of the individual subtasks and gives us information about the predicted dates of the milestones. The calculated critical path in this network characterizes a specific design project concerning to its duration very well. Several methods are available to support this step of preparation. This paper describes a new method to map the structure of the design process and clarify the milestones and predict the dates of these milestones. The method is based on the PERT (Project Evaluation and Review Technique) network but as a novelty it applies fuzzy logic to find out the concerning times in this graph. With the application of the fuzzy logic the handling of the different kinds of design uncertainties becomes feasible. Many kinds of design uncertainties exist from the possible electric blackout up to the illness of an engineer. In many cases these uncertainties are related with human errors and described with linguistic expressions. The fuzzy logic enables to transform these ambiguous expressions into numeric values for further mathematical evaluation. The method is introduced in the planning of the design project of the infrastructure for the diagnostic systems of ITER. The method not only helps the project in the planning phase, but it will be a powerful tool in mathematical modeling and monitoring of the project execution.

  15. A Framework for Improving Project Performance of Standard Design Models in Saudi Arabia

    Directory of Open Access Journals (Sweden)

    Shabbab Al-Otaib

    2013-07-01

    Full Text Available Improving project performance in the construction industry poses several challenges for stakeholders. Recently, there have been frequent calls for the importance of adopting standardisation in improving construction design as well as the process and a focus on learning mapping from other industries. The Saudi Ministry of Interior (SMoI has adopted a new Standard Design Model (SDM approach for the development of its construction programme to effectively manage its complex project portfolio and improve project performance. A review of existing literature indicates that despite the adoption of SDM repetitive projects, which enable learning from past mistakes and improving the performance of future projects, it has been realised that there is a lack of learning instruments to capture, store and disseminate Lessons Learnt (LL. This research proposes a framework for improving the project performance of SDMs in the Saudi construction industry. Eight case studies related to a typical standard design project were performed that included interviews with of 24 key stakeholders who are involved in the planning and implementation of SDM projects within the SMoI. The research identified 14 critical success factors CSFs have a direct impact on the SDM project performance. These are classified into three main CSF-related clusters: adaptability to the context; contract management; and construction management. A framework, which comprises the identified 14 CSFs, was developed, refined and validated through a workshop with 12 key stakeholders in the SMoI construction programme. Additionally, a framework implementation process map was developed. Web-based tools and KM were identified as core factors in the framework implementation strategy. Although many past CSF-related studies were conducted to develop a range of construction project performance improvement frameworks, the paper provides the first initiative to develop a framework to improve the performance of

  16. Post-accelerator LINAC design for the VECC RIB project

    Indian Academy of Sciences (India)

    Arup Bandyopadhyay

    2002-12-01

    Variable Energy Cyclotron Centre (VECC) is presently developing an ISOL post-acclerator type of RIB facility. The scheme utilises the existing = 130 room temperature variable energy cyclotron machine as the primary accelerator for the production of RIBs and radio frequency quadrupole (RFQ) and LINAC modules for the post-acceleration. The design aspects of these postaccelerator LINAC modules will be discussed in this paper.

  17. Information Flow Through Stages of Complex Engineering Design Projects: A Dynamic Network Analysis Approach

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Eppinger, Steven D.; Maier, Anja

    2015-01-01

    The pattern of information flow through the network of interdependent design activities is thought to be an important determinant of engineering design process results. A previously unexplored aspect of such patterns relates to the temporal dynamics of information transfer between activities...... information flows between activities in complex engineering design projects; 2) we show how the network of information flows in a large-scale engineering project evolved over time and how network analysis yields several managerial insights; and 3) we provide a useful new representation of the engineering...... design process and thus support theory-building toward the evolution of information flows through systems engineering stages. Implications include guidance on how to analyze and predict information flows as well as better planning of information flows in engineering design projects according...

  18. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  19. Structures and Design Phase I Summary for the NASA Composite Cryotank Technology Demonstration Project

    Science.gov (United States)

    Johnson, Ted; Sleight, David W.; Martin, Robert A.

    2013-01-01

    A description of the Phase I structures and design work of the Composite Cryotank Technology Demonstration (CCTD) Project is in this paper. The goal of the CCTD Project in the Game Changing Development (GCD) Program is to design and build a composite liquid-hydrogen cryogenic tank that can save 30% in weight and 25% in cost compared to state-of-the-art aluminum metallic cryogenic tank technology when the wetted composite skin wall is at an allowable strain of 5000 in/in. Three Industry teams developed composite cryogenic tank concepts that are compared for weight to an aluminum-lithium (Al-Li) cryogenic tank designed by NASA in Phase I of the CCTD Project. The requirements used to design all of the cryogenic tanks in Phase I will be discussed and the resulting designs, analyses, and weight of the concepts developed by NASA and Industry will be reviewed and compared.

  20. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    to start out with low speed and push the workload forward because the deadline is far out in the future. When approaching deadline the workload intensity increase creating an asymmetric effort over the project period (nine to eleven weeks). Brainstorming and ideation sessions in a workshop setting use...

  1. Project Bog Turtle

    OpenAIRE

    North Carolina Herpetological Society

    2007-01-01

    Project Bog Turtle South was started by the Conservation Committee of the North Carolina Herpetological Society in 1995 to protect the bog turtle and its habitat throughout the southeastern US. This is being done through leases, purchases or easements on bog turtle habitats, habitat restoration, scientific research, and education. The project is currently providing bog turtle protection for six sites in the Georgia and North Carolina areas.

  2. Design considerations of the World Bank-assisted $55 million photovoltaic market development project in India

    International Nuclear Information System (INIS)

    The World Bank's first loan for photovoltaic (PV) power systems was approved on December 17, 1992. The $55-million project will offer concessional financing through the Indian Renewable Energy Development Agency (IREDA) for the purchase of PV systems. The objective of the PV Market Development Project is to encourage the establishment of sustainable product supply, delivery, after-sales service, and financing mechanisms to support marketing PV products on a commercial basis. This paper outlines the issues and steps involved in the project design including: (1) technical viability, (2) financial and economic viability, (3) infrastructure issues, and (4) the economic and financial viability of the project as a whole

  3. SPECIAL REPORT - The KC EMPOWER Project: Designing More Accessible STEM Learning Activities

    Directory of Open Access Journals (Sweden)

    Bob Hirshon

    2016-01-01

    Full Text Available The overall purpose of the Kinetic City (KC Empower project was to examine how informal science activities can be made accessible for students with disabilities. The premise of this project was that all students, including those with disabilities, are interested in and capable of engaging in science learning experiences, if these experiences are accessible to them. Drawing on resources from Kinetic City, a large collection of science experiments, games, and projects developed by the American Association for the Advancement of Science (AAAS, the project researched and adapted five afterschool science activities guided by universal design for learning principles.

  4. The AGP-Project conceptual design for a Spanish HLW final disposal facility

    International Nuclear Information System (INIS)

    Within the framework of the AGP Project a Conceptual Design for a HLW Final Disposal Facility to be eventually built in an underground salt formation in Spain has been developed. The AGP Project has the character of a system analysis. In the current project phase I several alternatives has been considered for different subsystems and/or components of the repository. The system variants, developed to such extent as to allow a comparison of their advantages and disadvantages, will allow the selection of a reference concept, which will be further developed to technical maturity in subsequent project phases. (author)

  5. Analysing the Geothermal Project Life Cycle by Using the Design Structure Matrix

    OpenAIRE

    Witt, Magnus de 1988-

    2015-01-01

    This thesis reviews whether the project life cycle of a geothermal power project in Iceland could be mapped and represented in a common way. Is there any space for improving the project life cycle and is the design structure matrix (DSM) an appropriate tool for it? The basis of this study is the general project life cycle theory combined with the theory of economic clusters; the DSM theory is used for this. The cluster gives the geothermal field in Iceland a competitive advantage and the life...

  6. Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

    Energy Technology Data Exchange (ETDEWEB)

    Guy Cerimele

    2011-09-30

    This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

  7. Solar total energy project at Shenandoah, Georgia system design

    Science.gov (United States)

    Poche, A. J.

    1980-01-01

    The solar total energy system (STES) was to provide 50% of the total electrical and thermal energy requirements of the 25,000 sq ft Bleyle of America knitwear plant located at the Shenandoah Site. The system will provide 400 kilowatts electrical and 3 megawatts of thermal energy. The STES has a classical, cascaded total energy system configuration. It utilizes one hundred twenty (120), parabolic dish collectors, high temperature (750 F) trickle oil thermal energy storage and a steam turbine generator. The electrical load shaving system was designed for interconnected operation with the Georgia Power system and for operation in a stand alone mode.

  8. Integrating chemical engineering fundamentals in the capstone process design project

    OpenAIRE

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik; Abildskov, Jens

    2010-01-01

    All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30 students. The B.Eng. education lasts for 3½ years (seven semesters), of which the 5th semester consists of practical training with a company and the final (7th) semester consists of a research proje...

  9. Solar total energy project at Shenandoah, Georgia system design

    Science.gov (United States)

    Poche, A. J.

    1980-05-01

    The solar total energy system (STES) was to provide 50% of the total electrical and thermal energy requirements of the 25,000 sq ft Bleyle of America knitwear plant located at the Shenandoah Site. The system will provide 400 kilowatts electrical and 3 megawatts of thermal energy. The STES has a classical, cascaded total energy system configuration. It utilizes one hundred twenty (120), parabolic dish collectors, high temperature (750 F) trickle oil thermal energy storage and a steam turbine generator. The electrical load shaving system was designed for interconnected operation with the Georgia Power system and for operation in a stand alone mode.

  10. SEU blending project concept to commercial operation. Part 2: engineering design

    International Nuclear Information System (INIS)

    The process development program for production of Slightly Enriched Uranium (SEU) dioxide powder and Blend of Dysprosium and Uranium (BDU) oxide powder was initiated almost simultaneously with the conceptual engineering study for the commercial plant in 2001. During the very early phases of the project it was recognized that meeting the challenging requirements would necessitate wide expertise from different departments within the Cameco operations as well as consultants from outside the Company. The project team formed reflected this recognition. The conceptual engineering study was the lead into preparation of the engineering design study in 2003, which provided the process description, project description, and project cost estimates. The engineering design study addressed all aspects of the commercial plant including all health and safety, environment and security related issues, nuclear safety, training program, all product quality assurance issues, quality management issues, powder and fuel bundle transportation issues, meeting all regulatory requirements, establishing project execution plans and budget, and strategies to control the costs. (author)

  11. Status of the Project-X CW Linac Design

    Energy Technology Data Exchange (ETDEWEB)

    Ostiguy, J-F.; Solyak, N.; Berrutti, P.; Carneiro, J.P.; Lebedev, V.; Nagaitsev, S.; Saini, A.; Stheynas, B.; Yakovlev, V.P.; /Fermilab

    2012-05-01

    Project-X is a proposed proton accelerator complex at Fermilab that would provide particle beams to support a diversified experimental program at the intensity frontier. As currently envisioned, the complex would employ a CW superconducting linac to accelerate a 1 mA average, 5 mA peak H{sup -} beam from 2.1 MeV to 3 GeV. A second superconducting linac, operating in pulsed mode would ultimately accelerate a small fraction of this beam up to 8 GeV. The CW linac is based on five families of resonators operating at three frequencies: half-wave (1 family at 162.5 MHz), spoke (2 families at 325 MHz) and elliptical (2 families at 650 MHz). Accelerating and focusing elements are assembled in cryomodules separated by short warm sections. A long open region ({approx} 15 m) allows beam extraction at 1 GeV in support of a nuclear experimental program. In this paper, we present the latest iteration of the CW linac baseline lattice. We also briefly compare it to an alternative where the 162.5 half-wave resonators are replaced with 325 MHz spoke resonators.

  12. A projection method for under determined optimal experimental designs

    KAUST Repository

    Long, Quan

    2014-01-09

    A new implementation, based on the Laplace approximation, was developed in (Long, Scavino, Tempone, & Wang 2013) to accelerate the estimation of the post–experimental expected information gains in the model parameters and predictive quantities of interest. A closed–form approximation of the inner integral and the order of the corresponding dominant error term were obtained in the cases where the parameters are determined by the experiment. In this work, we extend that method to the general cases where the model parameters could not be determined completely by the data from the proposed experiments. We carry out the Laplace approximations in the directions orthogonal to the null space of the corresponding Jacobian matrix, so that the information gain (Kullback–Leibler divergence) can be reduced to an integration against the marginal density of the transformed parameters which are not determined by the experiments. Furthermore, the expected information gain can be approximated by an integration over the prior, where the integrand is a function of the projected posterior covariance matrix. To deal with the issue of dimensionality in a complex problem, we use Monte Carlo sampling or sparse quadratures for the integration over the prior probability density function, depending on the regularity of the integrand function. We demonstrate the accuracy, efficiency and robustness of the proposed method via several nonlinear under determined numerical examples.

  13. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  14. Solar Collector Design Optimization: A Hands-on Project Case Study

    Science.gov (United States)

    Birnie, Dunbar P., III; Kaz, David M.; Berman, Elena A.

    2012-01-01

    A solar power collector optimization design project has been developed for use in undergraduate classrooms and/or laboratories. The design optimization depends on understanding the current-voltage characteristics of the starting photovoltaic cells as well as how the cell's electrical response changes with increased light illumination. Students…

  15. Design and Evaluation of the NFL PLAY 60 FITNESSGRAM® Partnership Project

    Science.gov (United States)

    Welk, Gregory J.; Bai, Yang; Saint-Maurice, Pedro F.; Allums-Featherston, Kelly; Candelaria, Norma

    2016-01-01

    This article describes the conceptual design and evaluation strategies used in the NFL PLAY 60 FITNESSGRAM® Partnership Project, a large participatory research network focused on building effective school physical education programming. The article summarizes the unique participatory design, recruitment methods, programming strategies, and…

  16. Design of a support system for the vertical beam transfer lines of the ELENA project

    CERN Document Server

    Bozhkov, Kristiyan

    2016-01-01

    This report aims to present the design of a support system for the vertical beam transfer lines of the ELENA project. Two different designs can be found in this report. The mechanical strength and the structure performance of the support are analysed by a finite element model.

  17. Formulating a Serious-Games Design Project for Adult Offenders with the Probation Service

    Science.gov (United States)

    Bates, Matthew Ian; Brown, David; Cranton, Wayne; Lewis, James

    2011-01-01

    This paper documents an investigation evaluating if adult offenders can benefit from a facilitated serious-games design project as part of their probation program. Research has observed a participatory design group of adult offenders working with their probation managers and a PhD researcher to create a new serious-game for use by the probation…

  18. Smart energy households' pilot projects in the Netherlands with a design-driven approach

    NARCIS (Netherlands)

    Geelen, D.V.; Scheepens, A.; Kobus, C.; Obinna, U.; Mugge, R.; Schoormans, J.; Reinders, A.H.M.E.

    2013-01-01

    Residential smart grid projects can be evaluated by a design-driven approach, which focuses on gaining insights for successful product and service development by taking the end-users as a starting point. Because only little experience exists with this design-driven approach, this paper addresses how

  19. Cam Design Projects in an Advanced CAD Course for Mechanical Engineers

    Science.gov (United States)

    Ault, H. K.

    2009-01-01

    The objective of this paper is to present applications of solid modeling aimed at modeling of complex geometries such as splines and blended surfaces in advanced CAD courses. These projects, in CAD-based Mechanical Engineering courses, are focused on the use of the CAD system to solve design problems for applications in machine design, namely the…

  20. Case Study of a Project-Based Learning Course in Civil Engineering Design

    Science.gov (United States)

    Gavin, K.

    2011-01-01

    This paper describes the use of project-based learning to teach design skills to civil engineering students at University College Dublin (UCD). The paper first considers the development of problem-based leaning (PBL) as a tool in higher education. The general issues to be considered in the design of the curriculum for a PBL module are reviewed.…

  1. Electronic performance support for curriculum materials developers: A design research project in Sub-Saharan Africa

    NARCIS (Netherlands)

    McKenney, Susan; Reeves, Thomas

    2014-01-01

    McKenney, S., & Reeves, T. (2013). Electronic performance support for curriculum materials developers: A design research project in Sub-Saharan Africa. In T. Plomp, & N. Nieveen (Eds.), Educational design research – Part B: Illustrative cases (pp. 533-555). Enschede, the Netherlands: SLO.

  2. 77 FR 14857 - Final Federal Agency Actions on Proposed Highway in North Carolina

    Science.gov (United States)

    2012-03-13

    ... period still applies. FOR FURTHER INFORMATION CONTACT: Mr. George Hoops, P.E., Major Projects Engineer... American Grave Protection and Repatriation Act (NAGPRA) . 6. Social and Economic: Civil Rights Act of 1964... Hoops, Major Projects Engineer, Federal Highway Administration, Raleigh, North Carolina. BILLING...

  3. Supplmental design requirements document enhanced radioactive and mixed waste storage: Phase 5, Project W-113

    International Nuclear Information System (INIS)

    This Supplemental Design Requirements Document (SDRD) is used to communicate Project W-113 specific plant design information from Westinghouse Hanford Company (WHC) to the United States Department of Energy (DOE) and the cognizant Architect Engineer (A/E). The SDRD is prepared after the completion of the project Conceptual Design report (CDR) and prior to the initiation of definitive design. Information in the SDRD serves two purposes: to convey design requirements that are too detailed for inclusion in the Functional Design Criteria (FDC) report and to serve as a means of change control for design commitments in the Title I and Title II design. The Solid Waste Retrieval Project (W-113) SDRD has been restructured from the equipment based outline used in previous SDRDs to a functional systems outline. This was done to facilitate identification of deficiencies in the information provided in the initial draft SDRD and aid design confirmation. The format and content of this SDRD adhere as closely as practicable to the requirements of WHC-CM-6-1, Standard Engineering Practices for Functional Design Criteria

  4. Exploring an innovation project as source of change in organization design

    DEFF Research Database (Denmark)

    Brix, Jacob; Peters, Lois S.

    2015-01-01

    This study builds new empirically based theory on how the processing of an innovation project with a high degree of uncertainty induces change in key components in organization design. By using an embedded case study as our research strategy and organisation design theory as our analytical lens, we...... construct ten propositions that determine how the organization design of our case organization was influenced because of their innovation project. These changes represent: a) improved competencies for exploration activities, b) improved competencies for exploiting new knowledge, and c) increased readiness...

  5. Design requirements document for project W-520, immobilized low-activity waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, S.C.

    1998-08-06

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity.

  6. Exploring the dynamics of ownership in community-oriented design projects

    DEFF Research Database (Denmark)

    Light, Ann; Hansen, Nicolai Brodersen; Halskov, Kim;

    2013-01-01

    This paper contributes an exploration of ownership as a dynamic process in community-oriented projects. We use case study accounts of two design projects to consider participation in contexts where social structure is relevant to design outcomes. In studying these dynamics, we consider four aspec...... community groups in making internet radio podcasts to share insight. We examine the complexity of the social process involved and trace patterns of change, before concluding with pragmatic and ethical reasons for technology design to pay attention to ownership issues....

  7. Exploring an Innovation Project as a Source of Change in Organization Design

    Directory of Open Access Journals (Sweden)

    Jacob Brix

    2015-04-01

    Full Text Available This study builds new empirically based theory on how the processing of an innovation project with a high degree of uncertainty induces change in key components in organization design. By using an embedded case study as our research strategy and organization design theory as our analytical lens, we construct ten propositions that determine how the organization design of our case organization was influenced because of their innovation project. These changes represent: a improved competencies for exploration activities, b improved competencies for exploiting new knowledge, and c increased readiness for change.

  8. Digital VLSI systems design a design manual for implementation of projects on FPGAs and ASICs using Verilog

    CERN Document Server

    Ramachandran, S

    2007-01-01

    Digital VLSI Systems Design is written for an advanced level course using Verilog and is meant for undergraduates, graduates and research scholars of Electrical, Electronics, Embedded Systems, Computer Engineering and interdisciplinary departments such as Bio Medical, Mechanical, Information Technology, Physics, etc. It serves as a reference design manual for practicing engineers and researchers as well. Diligent freelance readers and consultants may also start using this book with ease. The book presents new material and theory as well as synthesis of recent work with complete Project Designs

  9. ART/Ada design project, phase 1. Task 2 report: Detailed design

    Science.gov (United States)

    Allen, Bradley P.

    1988-01-01

    Various issues are studied in the context of the design of an Ada based expert system building tool. Using an existing successful design as a starting point, the impact is analyzed of the Ada language and Ada development methodologies on that design, the Ada system is redesigned, and its performance is analyzed using both complexity-theoretic and empirical techniques. The algorithms specified in the overall design are refined, resolving and documenting any open design issues, identifying each system module, documenting the internal architecture and control logic, and describing the primary data structures involved in the module.

  10. Nuclear design aspect of the Korean high intensity proton accelerator project

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Jonghwa; Song, Tae-Yung [Korea Atomic Energy Research Inst., Yusong, Taejon (Korea, Republic of)

    1998-11-01

    A plan to construct a high current proton accelerator has been proposed by KAERI. We are presenting the required nuclear design to support the project as well as a brief overview of the proposed proton accelerator. The target and core design is highlighted to show feasibility of incineration of minor actinides from the spent fuel of light water reactors. Radiation shielding and activation analyses are also important for the design and the license of the accelerator. (author)

  11. Exploring an innovation project as source of change in organization design

    OpenAIRE

    Brix, Jacob; Peters, Lois S.

    2015-01-01

    This study builds new empirically based theory on how the processing of an innovationproject with a high degree of uncertainty induces change in key components in organization design. By using an embedded case study as our research strategy and organisation design theory as our analytical lens, we construct ten propositions that determine how the organization design of our case organization was influenced because of their innovation project. These changes represent: a) improved competencies f...

  12. Tank SY-102 remediation project: Flowsheet and conceptual design report

    International Nuclear Information System (INIS)

    The US Department of Energy established the Tank Waste Remediation System (TWRS) to safely manage and dispose of radioactive waste stored in underground tanks on the Hanford Site. A major program in TWRS is pretreatment which was established to process the waste prior to disposal. Pretreatment is needed to resolve tank safety issues and to separate wastes into high-level and low-level fractions for subsequent immobilization and disposal. There is a fixed inventory of actinides and fission products in the tank which must be prepared for disposal. By segregating the actinides and fission products from the bulk of the waste, the tank's contents can be effectively managed. Due to the high public visibility and environmental sensitivity of this problem, real progress and demonstrated efforts toward addressing it must begin as soon as possible. As a part of this program, personnel at the Los Alamos National Laboratory (LANL) have developed and demonstrated a flowsheet to remediate tank SY-102 which is located in the 200 West Area and contains high-level radioactive waste. This report documents the results of the flowsheet demonstrations performed with simulated, but radioactive, wastes using an existing glovebox line at the Los Alamos Plutonium Facility. The tank waste was characterized using both a tank history approach and an exhaustive evaluation of the available core sample analyses. This report also presents a conceptual design complete with a working material flow model, a major equipment list, and cost estimates

  13. Walking robot: A design project for undergraduate students

    Science.gov (United States)

    1990-01-01

    The design and construction of the University of Maryland walking machine was completed during the 1989 to 1990 academic year. It was required that the machine be capable of completing a number of tasks including walking a straight line, turning to change direction, and manuevering over an obstacle such as a set of stairs. The machine consists of two sets of four telescoping legs that alternately support the entire structure. A gear box and crank arm assembly is connected to the leg sets to provide the power required for the translational motion of the machine. By retracting all eight legs, the robot comes to rest on a central Bigfoot support. Turning is accomplished by rotating this machine about this support. The machine can be controlled by using either a user-operated remote tether or the onboard computer for the execution of control commands. Absolute encoders are attached to all motors to provide the control computer with information regarding the status of the motors. Long and short range infrared sensors provide the computer with feedback information regarding the machine's position relative to a series of stripes and reflectors. These infrared sensors simulate how the robot might sense and gain information about the environment of Mars.

  14. A distributed multimedia information system designed for the Arno project

    Science.gov (United States)

    Nativi, Stefano; Giuli, Dino; Pellegrini, Pier Franco

    The architecture of a multimedia information system, based on the Client-Server paradigm, is described. The system is conceived in order to collect, share and efficiently manage spatial remotely sensed multi-sensor images and ground data, spread over a network. Graphical workstations assure system access through the communication network. Even if this paper refers to a specific application, the system architecture embodies some concepts that are demonstrated to be convenient for the development and integration of information systems in spatial information sciences, as well as for the evolution of photogrammetric and remote sensing applications. Such architecture will be described referring to the implementation of an integrated, hydrogeological and meteorological database, collecting multisensor and multispectral data related to meteorological events. The database installations may be remotely accessed by meteorologists, geologists, hydrologists etc., from a graphical workstation through a specifically designed graphical user interface, in a distributed system configuration. The system allows users to query, to see, to understand and to obtain sequences of heterogeneous and multimedia data.

  15. Project Icarus: A Review of Interstellar Starship Designs

    Science.gov (United States)

    Obousy, R. K.

    Interstellar missions have been proposed as a priority for research into (1) the interstellar medium and any number of astrophysical studies which could be performed en-route, (2) astrophysical studies of a target star, or stars, if a multiple system is selected, (3) planetary science studies of any planets in the target system, including moons and large asteroids, and (4) astrobiological and exobiological studies of any habitable planets which may be found in a target system.The primary challenges associated with any interstellar mission relate to the distances involved, and missions conducted on timescales of a human lifetime are not possible using conventional chemical propulsion. Numerous unique solutions have been proposed including; beamed energy propulsion, fission/fusion propulsion, antimatter propulsion, and more exotic ideas like wormholes and warp drives. In this talk a broad overview of the state-of-the-art in starship design is presented. In addition a discussion the merits and limitations of these proposals is included. Finally an examination of the technological maturity of these concepts and the possibility of their realization within a century is presented.

  16. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten;

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However, it is not a ...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’.......If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However......, it is not a straightforward management task to operationalize client value in construction. Within this context, the client group comprises multiple stakeholders, which often have conflicting goals and values that may not be fully realized by the stakeholders themselves. The management challenge is further complicated...

  17. A web-based online collaboration platform for formulating engineering design projects

    Science.gov (United States)

    Varikuti, Sainath

    Effective communication and collaboration among students, faculty and industrial sponsors play a vital role while formulating and solving engineering design projects. With the advent in the web technology, online platforms and systems have been proposed to facilitate interactions and collaboration among different stakeholders in the context of senior design projects. However, there are noticeable gaps in the literature with respect to understanding the effects of online collaboration platforms for formulating engineering design projects. Most of the existing literature is focused on exploring the utility of online platforms on activities after the problem is defined and teams are formed. Also, there is a lack of mechanisms and tools to guide the project formation phase in senior design projects, which makes it challenging for students and faculty to collaboratively develop and refine project ideas and to establish appropriate teams. In this thesis a web-based online collaboration platform is designed and implemented to share, discuss and obtain feedback on project ideas and to facilitate collaboration among students and faculty prior to the start of the semester. The goal of this thesis is to understand the impact of an online collaboration platform for formulating engineering design projects, and how a web-based online collaboration platform affects the amount of interactions among stakeholders during the early phases of design process. A survey measuring the amount of interactions among students and faculty is administered. Initial findings show a marked improvement in the students' ability to share project ideas and form teams with other students and faculty. Students found the online platform simple to use. The suggestions for improving the tool generally included features that were not necessarily design specific, indicating that the underlying concept of this collaborative platform provides a strong basis and can be extended for future online platforms

  18. Ethanol Production from Biomass: Large Scale Facility Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Berson, R. Eric [Univ. of Louisville, KY (United States)

    2009-10-29

    High solids processing of biomass slurries provides the following benefits: maximized product concentration in the fermentable sugar stream, reduced water usage, and reduced reactor size. However, high solids processing poses mixing and heat transfer problems above about 15% for pretreated corn stover solids due to their high viscosities. Also, highly viscous slurries require high power consumption in conventional stirred tanks since they must be run at high rotational speeds to maintain proper mixing. An 8 liter scraped surface bio-reactor (SSBR) is employed here that is designed to efficiently handle high solids loadings for enzymatic saccharification of pretreated corn stover (PCS) while maintaining power requirements on the order of low viscous liquids in conventional stirred tanks. Saccharification of biomass exhibit slow reaction rates and incomplete conversion, which may be attributed to enzyme deactivation and loss of activity due to a variety of mechanisms. Enzyme deactivation is classified into two categories here: one, deactivation due to enzyme-substrate interactions and two, deactivation due to all other factors that are grouped together and termed “non-specific” deactivation. A study was conducted to investigate the relative extents of “non-specific” deactivation and deactivation due to “enzyme-substrate interactions” and a model was developed that describes the kinetics of cellulose hydrolysis by considering the observed deactivation effects. Enzyme substrate interactions had a much more significant effect on overall deactivation with a deactivation rate constant about 20X higher than the non-specific deactivation rate constant (0.35 h-1 vs 0.018 h-1). The model is well validated by the experimental data and predicts complete conversion of cellulose within 30 hours in the absence of enzyme substrate interactions.

  19. Rapid E-learning Development Strategies and a Multimedia Project Design Model

    Directory of Open Access Journals (Sweden)

    Ömer Faruk Sözcü

    2014-03-01

    Full Text Available The purpose of the study is to discuss e-learning design strategies which can be used for multimedia projects as a design model. Recent advances in instructional technologies have been found to be very important in the design of training courses by using rapid instructional design (ID approaches. The approaches were developed to use in training and developing e-learning projects as well as multimedia design tools. For this reason, this paper will clarify the basic e-learning development techniques, such as ID processes, and the present innovative multimedia design models in addition to traditional instruction design models. In this approach, rapid course development techniques were presented and considered as other ways of e-learning design techniques, such as job training, rapid synchronous e-learning, rapid asynchronous e-learning and online learning with multimedia design models. In the literature, developments in and considerations of multimedia learning are scrutinized. To design effective, efficient and engaging multimedia learning environments, instructional and meaningful e-learning models, which can be defined as integrated e-learning and multimedia projects design models, were developed and discussed. In this paper, firstly, rapid e-learning training development strategies and their characteristics are defined. Secondly, ID systems’ stages are presented as a generic model that includes several phases, such as analysis, design, development, implementation and evaluation. In this process, these ID phases were adapted into e-learning and multimedia learning design by using ID models and approaches. As a result, the paper is based on research findings and resources in the field of instructional technologies and e-learning design tools for multimedia learning in order to indicate rapid instructional development strategies more effectively.

  20. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  1. Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  2. Mental model differences between external designers and their clients: the influence on project exploration, project exploitation and project performance

    NARCIS (Netherlands)

    Tabeau, K.E.; Gemser, G.; Wijnberg, N.; Hultink, H.J.

    2013-01-01

    Prior research indicated that external designers are often hired by their clients to bring new knowledge into their organization. To assure that an external designer’s knowledge is implemented in the organization of the client, managing the relationship between the two is essential. Although it seem

  3. Scientists Engage South Carolina Community in Earthquake Education and Preparedness

    Science.gov (United States)

    Hall, C.; Beutel, E.; Jaume', S.; Levine, N.; Doyle, B.

    2008-12-01

    Scientists at the College of Charleston are working with the state of South Carolina's Emergency Management Division to increase awareness and understanding of earthquake hazards throughout South Carolina. As part of this mission, the SCEEP (South Carolina Earthquake Education and Preparedness) program was formed at the College of Charleston to promote earthquake research, outreach, and education in the state of South Carolina. Working with local, regional, state and federal offices, SCEEP has developed education programs for everyone from professional hazard management teams to formal and informal educators. SCEEP also works with the media to ensure accurate reporting of earthquake and other hazard information and to increase the public's understanding of earthquake science and earthquake seismology. As part of this program, we have developed a series of activities that can be checked out by educators for use in their classrooms and in informal education venues. These activities are designed to provide educators with the information and tools they lack to adequately, informatively, and enjoyably teach about earthquake and earth science. The toolkits contain seven activities meeting a variety of National Education Standards, not only in Science, but also in Geography, Math, Social Studies, Arts Education, History and Language Arts - providing a truly multidisciplinary toolkit for educators. The activities provide information on earthquake myths, seismic waves, elastic rebound, vectors, liquefaction, location of an epicenter, and then finally South Carolina earthquakes. The activities are engaging and inquiry based, implementing proven effective strategies for peaking learners' interest in scientific phenomena. All materials are provided within the toolkit and so it is truly check and go. While the SCEEP team has provided instructions and grade level suggestions for implementing the activity in an educational setting, the educator has full reign on what to showcase

  4. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  5. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  6. Method of formation of individual graphic style among students, studying projection objects of graphic design

    Directory of Open Access Journals (Sweden)

    Lyudmila Sinitsyna

    2015-04-01

    Full Text Available Projection of design objects is the main type of professional activity of designers, the creative almost un-predictable process. The skills of a designer are demanded by the society, when a certain designer at any time and without effort in a short period of time can develop a design object, which can easily be imple-mented in production, which will be in demand by a consumer for a long time and almost without special modifications. Each teacher of design thinks about the ways and methods of teaching the design stages. The author offers a way to get the skills of design based on the simultaneous execution of two tasks with different goals, objectives and method of images.

  7. Multi-disciplinary, community-oriented design of low-noise aircraft: the COSMA project

    OpenAIRE

    Iemma Umberto

    2016-01-01

    The EC-funded project COSMA (Community Oriented Solutions to Minimize aircraft noise Annoyance, 7th Framework Programme) started in June 2009 with an ambitious, twofold goal: improve the understanding of the annoyance induced by aircraft noise on the population and identify the engineering guidelines to establish appropriate design strategies and operational procedure to reduce these effects. The project was conceived within the context of the X-Noise Collaborative Net...

  8. Orthopaedic Footwear Design

    Science.gov (United States)

    1992-01-01

    Although the need for orthopaedic shoes is increasing, the number of skilled shoemakers has declined. This has led to the development of a CAD/CAM system to design and fabricate, orthopaedic footwear. The NASA-developed RIM database management system is the central repository for CUSTOMLAST's information storage. Several other modules also comprise the system. The project was initiated by Langley Research Center and Research Triangle Institute in cooperation with the Veterans Administration and the National Institute for Disability and Rehabilitation Research. Later development was done by North Carolina State University and the University of Missouri-Columbia. The software is licensed by both universities.

  9. Human-Centred Design Workshops in Collaborative Strategic Design Projects: An Educational and Professional Comparison

    Science.gov (United States)

    Liem, Andre; Sanders, Elizabeth B.-N.

    2013-01-01

    It has been found that the implementation of Human-centred Design (HCD) methods in the Fuzzy Front-End is not likely to lead to diversification in educational product planning exercises, where time lines are short and executors lack experience. Companies, interested to collaborate with Master-level Industrial Design students on strategic design…

  10. Preliminary Design Report for the Yakima/Klickitat Production Project; Executive Summary.

    Energy Technology Data Exchange (ETDEWEB)

    US Bonneville Power Administration.

    1990-03-01

    A master plan for the Yakima/Klickitat Production Project (YKPP) was developed by the Northwest Power Planning Council (Council) on October 15, 1987, as a reasonable basis upon which the Bonneville Power Administration (BPA) could proceed to fund predesign work on the project. The Council approved the predesign work on the condition that eight preliminary tasks were completed. These tasks are: Agreement on a refined statement of project goals. Completion of a technical analysis of water supplies. Completion of an experimental design plan. Development of a harvest management plan. Assessment of potential genetic risks. Project coordination with all other affected parties. Submission of a preliminary design report to the Council. Develop a project management structure. The preliminary design report summarizes the work completed on these tasks. It provides a description of the preliminary design, engineering, and construction phases of project development, and gives an estimate of project costs. Also included is a description of other studies that were conducted to support YKPP planning. The results of studies conducted during the last 30 months indicate that hatchery facilities can be built in the Yakima and Klickitat subbasins to provide harvest benefits and to supplement natural production. Planning for the Yakima subbasin is at a more advanced stage of development than for the Klickitat subbasin because of greater availability of basic resource information. The information needed to proceed with final design and construction for the Klickitat subbasin will be available by 1992, as ongoing predesign work continues. This schedule is consistent with the anticipated phased completion of the YKPP by 1997.

  11. 75 FR 65695 - North Carolina Disaster Number NC-00030

    Science.gov (United States)

    2010-10-26

    ... following areas as adversely affected by the disaster: Primary Counties: (Physical Damage and Economic... Carolina: Bladen, Columbus, Edgecombe, Greene, New Hanover, Sampson, Wilson. South Carolina: Horry....

  12. An NAFP Project: Use of Object Oriented Methodologies and Design Patterns to Refactor Software Design

    Science.gov (United States)

    Shaykhian, Gholam Ali; Baggs, Rhoda

    2007-01-01

    In the early problem-solution era of software programming, functional decompositions were mainly used to design and implement software solutions. In functional decompositions, functions and data are introduced as two separate entities during the design phase, and are followed as such in the implementation phase. Functional decompositions make use of refactoring through optimizing the algorithms, grouping similar functionalities into common reusable functions, and using abstract representations of data where possible; all these are done during the implementation phase. This paper advocates the usage of object-oriented methodologies and design patterns as the centerpieces of refactoring software solutions. Refactoring software is a method of changing software design while explicitly preserving its external functionalities. The combined usage of object-oriented methodologies and design patterns to refactor should also benefit the overall software life cycle cost with improved software.

  13. Inefficiencies in water project design and operation in the third world: An economic perspective

    Science.gov (United States)

    Howe, Charles W.; Dixon, John A.

    1993-07-01

    Water projects in less developed countries (LDCs) frequently are poorly operated and maintained. As a result, project benefits and development impacts fall short of plans. The problems begin in the project identification, design, and construction stages: donor and host country biases lead to inappropriate projects, unsustainable technologies, and shoddy construction. Later operation and maintenance are then difficult or impossible. Causal factors include donor desire to build monuments and sell technology, provision of excessive capital to favored sectors or institutions, and an unwillingness to require a reasonable quid pro quo from the host country. Host country factors include excessive administrative centralization, lack of rewards for good operation and maintenance, and widespread corruption in forms that seriously distort allocative efficiency. Until individual actors on both sides can be motivated to pursue the long-run good of the LDC, Third World water projects will continue to have low or negative net payoffs.

  14. Assessment of active solar systems in the residential sector of North Carolina, 1974 - 1995

    Science.gov (United States)

    Brown, D.; St. John, K.

    1981-02-01

    An evaluation is presented of the contribution active solar systems can make in North Carolina's residential sector over the next 15 years. The report is divided into 5 parts: introduction; current solar industry status; projected use of active solar systems to 1995; maximum potential for active solar systems to 1995; recommendations for state solar incentives. Information in the appendices includes: conversion methodology; square feet of collector to Btu; economic analysis of solar systems based on life costs; methodology for percentage breakdowns on projected solar system sales; North Carolina solar manufacturers/distributors and national manufacturers; solar legislation; economic analysis of solar systems; and data sources.

  15. 3D Projection on Physical Objects: Design Insights from Five Real Life Cases

    DEFF Research Database (Denmark)

    Dalsgaard, Peter; Halskov, Kim

    2011-01-01

    have developed installations that employ 3D projection on physical objects. The installations have been developed in collaboration with external partners and have been put into use in real-life settings such as museums, exhibitions and interaction design laboratories. On the basis of these cases, we......3D projection on physical objects is a particular kind of Augmented Reality that augments a physical object by projecting digital content directly onto it, rather than by using a mediating device, such as a mobile phone or a head- mounted display. In this paper, we present five cases in which we...

  16. Community-based chronic disease interventions:Experience from the North Carolina Project in Finland and its implications for China%慢性病的社区干预:芬兰北卡项目的经验与启示

    Institute of Scientific and Technical Information of China (English)

    郇建立

    2016-01-01

    Chronic Diseases have been the major public health problem since 1990 in China.This paper aims to explore the main results of the comprehensive sort of the North Carolina Project in Finland including the effects , key initiatives , intervention practices and successful experiences , and discusses the implications of Fanland experi-ence-based for the Chinese chronic disease intervention .The North Carolina Project shows that community-based in-terventions form an effective strategy for the prevention and control of chronic diseases .In order to respond effectively to the chronic disease challenges , the Chinese government should not only use community-based intervention strate-gies, but also implement a “comprehensive health policy”, creating a good and social atmosphere for the chronic dis-ease intervention .%自20世纪90年代以来,慢性病已经成为中国的主要公共卫生问题。本文全面梳理了芬兰北卡项目的主要成效、关键举措和成功经验,并在此基础上讨论了芬兰经验对中国慢性病干预的启示。北卡项目表明,社区干预是慢性病预防和控制的有效路径。中国政府要想有效应对慢性病的挑战,总体上应该采取社区干预的思路,同时还需实施“将健康融入所有政策”,为慢性病的社区干预创造良好的社会氛围。

  17. SolarOil Project, Phase I preliminary design report. [Solar Thermal Enhanced Oil Recovery project

    Energy Technology Data Exchange (ETDEWEB)

    Baccaglini, G.; Bass, J.; Neill, J.; Nicolayeff, V.; Openshaw, F.

    1980-03-01

    The preliminary design of the Solar Thermal Enhanced Oil Recovery (SolarOil) Plant is described in this document. This plant is designed to demonstrate that using solar thermal energy is technically feasible and economically viable in enhanced oil recovery (EOR). The SolarOil Plant uses the fixed mirror solar concentrator (FMSC) to heat high thermal capacity oil (MCS-2046) to 322/sup 0/C (611/sup 0/F). The hot fluid is pumped from a hot oil storage tank (20 min capacity) through a once-through steam generator which produces 4.8 MPa (700 psi) steam at 80% quality. The plant net output, averaged over 24 hr/day for 365 days/yr, is equivalent to that of a 2.4 MW (8.33 x 10/sup 6/ Btu/hr) oil-fired steam generator having an 86% availability. The net plant efficiency is 57.3% at equinox noon, a 30%/yr average. The plant will be demonstrated at an oilfield site near Oildale, California.

  18. Conceptual design report, plutonium stabilization and handling,project W-460

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, E.V.

    1997-03-06

    Project W-460, Plutonium Stabilization and Handling, encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM for up to fifty years. This Conceptual Design Report (CDR) provides conceptual design details for the vault modification, site preparation and site interface with the purchased SPS. Two concepts are described for vault configuration; acceleration of this phase of the project did not allow completion of analysis which would clearly identify a preferred approach.

  19. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  20. Advanced conceptual design report solid waste retrieval facility, phase I, project W-113

    Energy Technology Data Exchange (ETDEWEB)

    Smith, K.E.

    1994-03-21

    Project W-113 will provide the equipment and facilities necessary to retrieve suspect transuranic (TRU) waste from Trench 04 of the 218W-4C burial ground. As part of the retrieval process, waste drums will be assayed, overpacked, vented, head-gas sampled, and x-rayed prior to shipment to the Phase V storage facility in preparation for receipt at the Waste Receiving and Processing Facility (WRAP). Advanced Conceptual Design (ACD) studies focused on project items warranting further definition prior to Title I design and areas where the potential for cost savings existed. This ACD Report documents the studies performed during FY93 to optimize the equipment and facilities provided in relation to other SWOC facilities and to provide additional design information for Definitive Design.

  1. Financial Flexibility in North Carolina Schools.

    Science.gov (United States)

    Suarez, Tanya M.; Polen, Deborah A.

    This paper explores educational financial flexibility with a focus on the specific issues surrounding local flexibility in North Carolina school districts. Strategies that states have used to increase local financial flexibility include waivers, reduction of budget categories, block grants, and school-based budgeting. The North Carolina system of…

  2. Colon Cancer Screening in North Carolina.

    Science.gov (United States)

    Harvin, Glenn

    2016-01-01

    Colorectal cancer (CRC) is the 2nd leading cause of cancer death both in North Carolina and in the United States. The goal of CRC screening is early detection and prevention. This commentary reviews the evidence for screening, discusses current screening options, and explores which options are best suited for use in North Carolina. PMID:27154885

  3. North Carolina School Nurse Leadership Institute

    Science.gov (United States)

    Guttu, Martha

    2007-01-01

    Recognizing that school nurse leaders are essential to the development of school nurses, the North Carolina School Nurse Leadership Institute was developed to enable school nurse leaders to update and advance their leadership skills. The Institute was a collaborative endeavor between the North Carolina Department of Health and Human Services,…

  4. The Human Studies Database Project: Federating Human Studies Design Data Using the Ontology of Clinical Research

    OpenAIRE

    Sim, Ida; Carini, Simona; Tu, Samson; Wynden, Rob; Pollock, Brad H.; Mollah, Shamim A.; Gabriel, Davera; Hagler, Herbert K.; Scheuermann, Richard H.; Lehmann, Harold P.; Wittkowski, Knut M.; Nahm, Meredith; Bakken, Suzanne

    2010-01-01

    Human studies, encompassing interventional and observational studies, are the most important source of evidence for advancing our understanding of health, disease, and treatment options. To promote discovery, the design and results of these studies should be made machine-readable for large-scale data mining, synthesis, and re-analysis. The Human Studies Database Project aims to define and implement an informatics infrastructure for institutions to share the design of their human studies. We h...

  5. Information Flow Through Stages of Complex Engineering Design Projects: A Dynamic Network Analysis Approach

    OpenAIRE

    Parraguez, Pedro; Eppinger, Steven D.; Maier, Anja

    2015-01-01

    The pattern of information flow through the network of interdependent design activities is thought to be an important determinant of engineering design process results. A previously unexplored aspect of such patterns relates to the temporal dynamics of information transfer between activities as those activities are implemented through the network of people executing the project. To address this gap, we develop a dynamic modeling method that integrates both the network of people and the networ...

  6. Project HealthDesign: Stimulating the Next Generation of Personal Health Records

    OpenAIRE

    Brennan, Patricia Flatley; Downs, Stephen; Casper, Gail; Kenron, Daniel

    2007-01-01

    Project HealthDesign is a national program designed to rethink the power and potential of personal health records. It intends to stimulate development of new personal health management tools by harnessing the content of the personal health record and making advice, recommendations, and data-tracking tools available to lay people. The program goals include creating a set of prototype personal health records applications, deriving the core functions needed to support interoperable ‘plug-and-pla...

  7. A general framework for multi-flow multi-layer multi-project reticles design

    Science.gov (United States)

    Kahng, Andrew B.; Xu, Xu

    2006-10-01

    The aggressive scaling of VLSI feature size and the pervasive use of advanced reticle enhancement technologies leads to dramatic increases in mask costs, pushing prototype and low volume production designs at the limit of economic feasibility. Multiple project wafers (MPW), or "shuttle" runs, provide an attractive solution for such designs, by providing a mechanism to share the cost of mask tooling among up to tens of designs of the same technology flow. However, delay cost associated with schedule alignment is ignored in previous work. The saving on mask cost may be easily surpassed by the profit loss due to the schedule alignment. Therefore, Multi- flow Multi-layer Multi-project Reticles (MFMLMPR) become a more viable mask-cost saving technique for low volume production since it share the mask cost between different layers of the same design and between designs of different technology flows. However, MFMLMPR design introduce complexities not encountered in traditional single-flow or single-layer reticles. In this paper we propose the first design flow for MFMLMPR aimed at minimizing the total manufacturing cost (including mask cost, wafer cost and delay cost) to fulfill given die production volumes. Our flow includes three main steps: (1) schedule-aware project partitioning with multi-flow embedding (2) multi-frame reticle design, and (3) multi-project frame floorplanning. Our contributions are as follows. For the first step, a fast iterative matching algorithm is proposed to calculate the mask cost for multi-flow embedding with consideration of all practical manufacturing costs. We then propose an integer linear programming (ILP) based method for optimal manufacturing cost minimization. Since ILP suffers from impractically long runtimes when the number of projects is large, we propose a sliding time window heuristic to exhaustively search the solution space for the best tradeoff between mask cost and delay cost. For the second step, we propose an ASAP frame

  8. Long-Term Ecological Research (LTER) Macrobenthos Data for the North Inlet Estuary, Georgetown, South Carolina: 1981-1992

    Data.gov (United States)

    Baruch Institute for Marine and Coastal Sciences, Univ of South Carolina — Samples were taken from two estuarine tidal creek stations (designated BB and DD) in the North Inlet Estuary, SC. Two large cores, with a sediment surface area of...

  9. Student-Designed Service-Learning Projects in an Undergraduate Neurobiology Course

    Directory of Open Access Journals (Sweden)

    Katharine V. Northcutt

    2015-12-01

    Full Text Available One of the challenges in teaching a service-learning course is obtaining student buy-in from all students in the course. To circumvent this problem, I have let students in my undergraduate Neurobiology course design their own service-learning projects at the beginning of the semester. Although this can be chaotic because it requires last-minute planning, I have made it successful through facilitating student communication in the classroom, requiring thorough project proposals, meeting with students regularly, and monitoring group progress through written reflection papers. Most of my students have strong opinions about the types of projects that they want to carry out, and many students have used connections that they have already made with local organizations. Almost all projects that students have designed to this point involve teaching basic concepts of neurobiology to children of various ages while simultaneously sparking their interest in science. Through taking ownership of the project and designing it such that it works well with their strengths, interests, and weekly schedule, students have become more engaged in service learning and view it as a valuable experience. Despite some class time being shifted away from more traditional assignments, students have performed equally well in the course, and they are more eager to talk with others about course concepts. Furthermore, the feedback that I have received from community partners has been excellent, and some students have maintained their work with the organizations.

  10. The Business Case for Sustainable Design - the City of Melbourne CH2 Project

    Directory of Open Access Journals (Sweden)

    Peter Stewart

    2012-11-01

    Full Text Available The City of Melbourne's landmark building development project.referred to as Council House 2 (CH2 is to be completed during2006. CH2 is a world leading six star environmental buildingincorporating sustainable technologies and producing financial.environmental and societal benefits. The business case forsustainable design within the context of CH2 is examined . Anoverview is carried out of traditional business case decisionmaking tools used in the context of property development. Thecase for the design and construction of ecologically sustainablebuildings is considered . The CH2 project is reviewed in detail andthe "triple bottom line" business case model developed by the Cityof Melbourne. which underpins the development. is investigated.It is concluded that the CH2 development should deliver diversebenefits to all stakeholders; the Council. staff. business andratepayers. Further. the business case model developed by theCH2 project can be utilized as an exemplar for other developments.

  11. [Evaluation and design of a political-pedagogical project for nursing undergraduate programs].

    Science.gov (United States)

    de Oliveira, Beatriz Rosana Gonçalves; Schneider, Jacó Fernando; Rizzotto, Maria Lucia Frizon; Rodrigues, Rosa Maria

    2003-01-01

    This work presents the results of an experience which aimed primarily at the evaluation of the Political-Pedagogical Project--PPP of the nursing undergraduate program from UNIOESTE (Cascavel town Campus) and at pondering on a new curricular proposal for that program. Thus, a research project was designed to be used by all professors teaching that program, with the participation of students, former students, and professionals working on the health care delivery network, where field work can be carried out through practical activities and training periods for the students. The data gathered by them have been used as subsidies for a proposal to build a new political-pedagogical project, that was took effect in the year 2003. Besides designing a new pedagogical proposal, strategies for a continued evaluation of the PPP implantation process have been defined. This evaluation is to be performed at the end of each term. PMID:14699755

  12. Accreditation and Participatory Design: An Effects-Driven Road to Quality Development Projects

    DEFF Research Database (Denmark)

    Simonsen, Jesper; Scheuer, John Damm

    This paper presents a soft project management paradigm approach based on participatory design to assuring values and benefits in public projects. For more than a decade, quality development in the Danish healthcare sector has been managed with an accreditation system known as the Danish Quality......-driven IT development and suggest how this approach may form a cornerstone of project management in a new quality-assurance program for the Danish healthcare sector....... Model (DQM). In 2015, in an attempt to reduce “bureaucratic process requirements” and “focus on specific goals and results,” the Danish government decided to discontinue this system (The Danish Ministry of Health, 2015, p. 2). In this paper, we introduce a participatory design approach known as effects...

  13. Magic-Mirror-Spiral: Looking into the role of 'design ideal' in interaction design research projects

    DEFF Research Database (Denmark)

    Bagalkot, Naveen L.; Nazzi, Elena; Sokoler, Tomas

    2011-01-01

    the dialectic during a research practice are missing. In order to embrace this dialectic, in this paper we suggest the formulation of a Design Ideal as the interface between theoretical concept and situation. We support our suggestion by a retrospection of our ongoing exploration of MagicMirrorSpiral...

  14. Quality Matters™: An Educational Input in an Ongoing Design-Based Research Project

    Science.gov (United States)

    Adair, Deborah; Shattuck, Kay

    2015-01-01

    Quality Matters (QM) has been transforming established best practices and online education-based research into an applicable, scalable course level improvement process for the last decade. In this article, the authors describe QM as an ongoing design-based research project and an educational input for improving online education.

  15. On Power Relation in the Design of Language Research Project and the Analysis of Data

    Science.gov (United States)

    Zhang, Wei

    2009-01-01

    How to deal with the relationship between the researcher and the "researched" is a crucial thing in design of a language research project and the analysis of data. The paper mainly focuses the influence of power relations between the researcher and the "researched" people. To do social research "on, for and with" the…

  16. A Project-Based Laboratory for Learning Embedded System Design with Industry Support

    Science.gov (United States)

    Lee, Chyi-Shyong; Su, Juing-Huei; Lin, Kuo-En; Chang, Jia-Hao; Lin, Gu-Hong

    2010-01-01

    A project-based laboratory for learning embedded system design with support from industry is presented in this paper. The aim of this laboratory is to motivate students to learn the building blocks of embedded systems and practical control algorithms by constructing a line-following robot using the quadratic interpolation technique to predict the…

  17. The Social Security Administration's Youth Transition Demonstration Projects: Evaluation Design Report.

    OpenAIRE

    Anu Rangarajan; Thomas Fraker; Todd Honeycutt; Arif Mamun; John Martinez; Bonnie O'Day; David Wittenburg

    2009-01-01

    This report describes the research and policy context for the evaluation, logic model underlying the projects, and selection of the random assignment sites and enrollment of youth. It also presents comprehensive designs for the process, cost, impact, and benefit-cost analyses, and concludes with a timeline and a schedule for major reports.

  18. Command and Control for ADSP-21992 : template design for mechatronica project

    NARCIS (Netherlands)

    Zandwijk, van Olaf

    2005-01-01

    The goal of this project is to design a hardware template for the hardware connector tool. With this template, one must be able to generate C code for the Analog devices ADSP-21992 EZ-kit Lite evaluation board from a hardware independent 20-Sim model. The template, together with the mentioned softwa

  19. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control desig...

  20. Practicing Learner-Centered Teaching: Pedagogical Design and Assessment of a Second Life Project

    Science.gov (United States)

    Schiller, Shu Z.

    2009-01-01

    Guided by the principles of learner-centered teaching methodology, a Second Life project is designed to engage students in active learning of virtual commerce through hands-on experiences and teamwork in a virtual environment. More importantly, an assessment framework is proposed to evaluate the learning objectives and learning process of the…

  1. Promises, Premises and Risks: Sharing Responsibilities, Working Up Trust and Sustaining Commitment in Participatory Design Projects

    DEFF Research Database (Denmark)

    Büscher, Monika; Hartswood, Mark; Mogensen, Preben Holst;

    2002-01-01

    While participatory design crosses the boundaries between technology production and use, it does not erase them. In accounts of participatory projects, the work of negotiating and changing these boundaries often recedes into the background, yet it is crucial in shaping the very nature and scope of...

  2. An Automated BIM Model to Conceptually Design, Analyze, Simulate, and Assess Sustainable Building Projects

    Directory of Open Access Journals (Sweden)

    Farzad Jalaei

    2014-01-01

    Full Text Available Quantifying the environmental impacts and simulating the energy consumption of building’s components at the conceptual design stage are very helpful for designers needing to make decisions related to the selection of the best design alternative that would lead to a more energy efficient building. Building Information Modeling (BIM offers designers the ability to assess different design alternatives at the conceptual stage of the project so that energy and life cycle assessment (LCA strategies and systems are attained. This paper proposes an automated model that links BIM, LCA, energy analysis, and lighting simulation tools with green building certification systems. The implementation is within developing plug-ins on BIM tool capable of measuring the environmental impacts (EI and embodied energy of building components. Using this method, designers will be provided with a new way to visualize and to identify the potential gain or loss of energy for the building as a whole and for each of its associated components. Furthermore, designers will be able to detect and evaluate the sustainability of the proposed buildings based on Leadership in Energy and Environmental Design (LEED rating system. An actual building project will be used to illustrate the workability of the proposed methodology.

  3. Reservoir design of a shallow LP-SAGD project for in situ extraction of Athabasca bitumen

    Energy Technology Data Exchange (ETDEWEB)

    Palmgren, C.; Walker, I. [Alberta Oilsands (Canada); Carlson, M.; Uwiera, M. [Inc RPS Energy (Canada); Torlak, M. [Siemens AG (Canada)

    2011-07-01

    Alberta Oilsands Inc. is developing a project 8 km southeast of Fort McMurray, Alberta, Canada. The Clearwater project aims to extract bitumen from a shallow bitumen reservoir through in situ production; the aim of this paper is to present this project and to evaluate the commercial viability of combining different technologies such as steam assisted gravity drainage (SAGD), solvent co-injection and electro-magnetic heating. Alberta Oilsands will put 6 SAGD well pairs and infill wells in place to effectively recover the bitumen. Reservoir simulations were carried out using reservoir models based on geological, petrophysical and geostatical work. Results showed that the combination of SAGD, solvent co-injection and electro-magnetic heating can increase bitumen production while reducing the steam oil ratio. This paper provides information on the Phase I reservoir design of the Clearwater project; steam injection and bitumen recovery are expected to start in 2012.

  4. The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)

    Science.gov (United States)

    Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry

    2016-01-01

    Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.

  5. Implementation of an Industrial-Based Case Study as the Basis for a Design Project in an Introduction to Mechanical Design Course

    Science.gov (United States)

    Lackey, Ellen

    2011-01-01

    The purpose of this paper is to discuss the implementation of an industrial-based case study as the basis for a design project for the Spring 2009 Introduction to Mechanical Design Course at the University of Mississippi. Course surveys documented the lack of student exposure in classes to the types of projects typically experienced by engineers…

  6. A Design Methodology for Folded, Pipelined Architectures in VLSI Applications using Projective Space Lattices

    OpenAIRE

    Sharma, Hrishikesh; Patkar, Sachin

    2011-01-01

    Semi-parallel, or folded, VLSI architectures are used whenever hardware resources need to be saved at design time. Most recent applications that are based on Projective Geometry (PG) based balanced bipartite graph also fall in this category. In this paper, we provide a high-level, top-down design methodology to design optimal semi-parallel architectures for applications, whose Data Flow Graph (DFG) is based on PG bipartite graph. Such applications have been found e.g. in error-control coding ...

  7. Design and simulation of a micromirror array for a projection TV

    Science.gov (United States)

    Choi, Bumkyoo; Lee, Junghoon; Jung, Kyuwon; Shin, Hyungjae

    1999-10-01

    The design of a micromirror for a projection TV is investigated. A static structural analysis is performed to give an optimal shape of the micromirror using the FEM commercial package, ANSYS. A solid modeling is created, and mapped meshes are applied to it in order to satisfy a symmetric condition. A stress analysis shows that maximum stress does not exceed an allowable stress, which is the yield strength. A modal analysis is also executed to find the approximate natural frequencies with different design parameters. The result can be utilized to see which design parameter is strongly dominant. The micromirror was fabricated by Samsung Electronics. Dynamic deflection experiments confirm the results of the simulation.

  8. The design of a radio frequency quadrupole LINAC for the RIB project at VECC Kolkata

    Indian Academy of Sciences (India)

    V Banerjee; Alok Chakrabarti; Arup Bandyopadhyay; T K Bhaumik; M Mondal; T K Chakraborty; H Pande; O Kamigaito; A Goto; Y Yano

    2002-12-01

    A radio frequency quadrupole LINAC has been designed for the VECC-RIB project for an input beam energy of 1.0 keV/u and / ≥ 1/16. The output energy will be about 90 keV/u for a 3.4 m long, 35 MHz structure. A half-scale cold model of the RFQ has been fabricated and tested for rf structure design study. The beam dynamics and rf-structure design along with the results of the cold model tests will be presented.

  9. [Tampa Electric Company IGCC project]. Final public design report; Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

  10. Waste Receiving and Processing Facility, Module 1: Volume 7, Project design criteria

    International Nuclear Information System (INIS)

    This Project Design Criteria document for the WRAP facility at the Hanford Site is presented within a systems format. The WRAP Module 1 facility has been categorized into eight (8) engineering systems for design purposes. These systems include: receiving, shipping and storage, nondestructive assay/nondestructive examination (NDA/NDE), waste process, internal transportation, building, heating ventilation and air conditioning (HVAC), process control, and utilities. Within each system section of this document, the system-specific requirements are identified. The scope of the system is defined, the design goals are identified and the functional requirements are detailed

  11. Sıkışma: An Alternative Information Design Project for Ihlamur Pavilions Istanbul.

    Science.gov (United States)

    Özmen, Melike

    2016-01-01

    Sıkışma is a transmedia information design project, which focuses on Ihlamur Pavilions and Ihlamur area. Ihlamur hosts Ihlamur Pavilions since 19th Century. It is located within Beşiktaş district in Istanbul. Nowadays the buildings belong to TBMM (The Grand National Assembly of Turkey) National Palaces and used as a Museum- Café. There is a conventional wayfinding & signage system for outdoor areas of the Pavilions. The system also includes two separate boards focusing on the history of Ihlamur and Ihlamur Pavilions. However, the information provided on these boards seems inadequate and the boards are physically damaged. According Universal Design approach it is possible to achieve good and functional design and solve the inadequacy problem by physically fixing information boards and re-setting the environment around the information boards according to Universal Design principles. Although, these principles provide solutions for important issues such as mobility, stability and accessibility, it doesn't provide sufficient proof of user engagement in terms of the creation of the content. The project Sıkışma offers an approach, which is concerned with content as with form and suggests that it is possible to infer a universal form from the content created through personal experience of the designer as a user. It is also intended to represent the past and the present through the project and to create an understanding of plausible scenarios of the unknown future in the viewers' mind.

  12. Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Boyd D. Chirstensen

    2012-04-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

  13. Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Boyd D. Chirstensen

    2012-08-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

  14. Sıkışma: An Alternative Information Design Project for Ihlamur Pavilions Istanbul.

    Science.gov (United States)

    Özmen, Melike

    2016-01-01

    Sıkışma is a transmedia information design project, which focuses on Ihlamur Pavilions and Ihlamur area. Ihlamur hosts Ihlamur Pavilions since 19th Century. It is located within Beşiktaş district in Istanbul. Nowadays the buildings belong to TBMM (The Grand National Assembly of Turkey) National Palaces and used as a Museum- Café. There is a conventional wayfinding & signage system for outdoor areas of the Pavilions. The system also includes two separate boards focusing on the history of Ihlamur and Ihlamur Pavilions. However, the information provided on these boards seems inadequate and the boards are physically damaged. According Universal Design approach it is possible to achieve good and functional design and solve the inadequacy problem by physically fixing information boards and re-setting the environment around the information boards according to Universal Design principles. Although, these principles provide solutions for important issues such as mobility, stability and accessibility, it doesn't provide sufficient proof of user engagement in terms of the creation of the content. The project Sıkışma offers an approach, which is concerned with content as with form and suggests that it is possible to infer a universal form from the content created through personal experience of the designer as a user. It is also intended to represent the past and the present through the project and to create an understanding of plausible scenarios of the unknown future in the viewers' mind. PMID:27534336

  15. Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Gary Mecham

    2009-10-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

  16. Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Boyd D. Chirstensen

    2015-03-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1C, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

  17. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects: A Workshop Approach

    Directory of Open Access Journals (Sweden)

    Mikael Hygum Thyssen

    2010-05-01

    Full Text Available If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However, it is not a straightforward management task to operationalize client value in construction. Within this context, the client group comprises multiple stakeholders, which often have conflicting goals and values that may not be fully realized by the stakeholders themselves. The management challenge is further complicated by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The article reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of `value'. DOI: 10.3763/aedm.2008.0095

  18. The Russell gold deposit, Carolina Slate Belt, North Carolina

    Science.gov (United States)

    Klein, T.L.; Cunningham, C.G.; Logan, M.A.V.; Seal, R.R.

    2007-01-01

    Gold deposits have been mined in the Carolina slate belt from the early 1800s to recent times, with most of the production from large mines in South Carolina. The Russell mine, one of the larger producers in North Carolina, is located in the central Uwharrie Mountains, and produced over 470 kg of gold. Ore grades averaged about 3.4 grams per tonne (g/ t), with higher-grade zones reported. The Russell deposit is interpreted to be a sediment-hosted, gold-rich, base-metal poor, volcanogenic massive sulfide deposit in which gold was remobilized, in part, during Ordovician metamorphism. The ore was deposited syngenetically with laminated siltstones of the late Proterozoic Tillery Formation that have been metamorphosed to a lower greenschist facies. The Tillery Formation regionally overlies subaerial to shallow marine rhyolitic volcanic and volcaniclastic rocks of the Uwharrie Formation and underlies the marine volcanic and sedimentary rocks of the Cid Formation. Recent mapping has shown that a rhyolitic dome near the Russell mine was extruded during the deposition of the lower part of the Tillery Formation, at about the same time as ore deposition. Relict mafic, rock fragments present in the ore zones suggest contemporaneous bimodal (rhyolite-basalt) volcanism. The maximum formation age of the Russell deposit is younger than 558 Ma, which is similar to that of the larger, well known Brewer, Haile, and Ridgeway deposits of South Carolina. Gold was mined from at least six zones that are parallel to the regional metamorphic foliation. These strongly deformed zones consist of northeast-trending folds, high-angle reverse faults, and asymmetric doubly plunging folds overturned to the southeast. The dominant structure at the mine is an asymmetric doubly plunging anticline with the axis trending N 45?? E, probably related to late Ordovician (456 ?? 2 Ma) regional metamorphism and deformation. Two stages of pyrite growth are recognized. Stage 1, primary, spongy pyrite, is

  19. Animal Guts as Ideal Reactors: An Open-Ended Project for a Course in Kinetics and Reactor Design.

    Science.gov (United States)

    Carlson, Eric D.; Gast, Alice P.

    1998-01-01

    Presents an open-ended project tailored for a senior kinetics and reactor design course in which basic reactor design equations are used to model the digestive systems of several animals. Describes the assignment as well as the results. (DDR)

  20. Inclusive design in the implementation of projects for schools modernization in Portugal - case studies.

    Science.gov (United States)

    Lopes, Lígia; Aguiar, Carlos; da Silva, Fernando Moreira

    2012-01-01

    The Project for Schools Modernization taking place in Portugal, with an estimated total investment of 2450 million for the intervention in the first 205 schools, provide the reclassification of 332 secondary schools by 2015. One of the questions we can pose is if the authorities and the teams of architects selected to design these schools considered fundamental for the correctness of architectural barriers within the school and its accessibility the implementation of standards and principles of inclusion of children/teenagers with special needs within their school environment. As most of the projects are already being implemented, the main aim of this paper is to present the outcomes of a comparative analysis and synthesis of six schools located in the northern part of the country. This analysis occurs from the of Participatory Design perspective which appeals to the experience of the disable children to look (or evaluate) the negative and positive factors in terms of physical space, interpreted by inclusive design rules and orientations. Therefore, the evaluation of schools modernization project, and its discussion, is central for the understanding how these children are addressed in projects which are directed at them. PMID:22317620

  1. System Design and Research of Yunnan-Guangdong ±800 kV UHVDC Project

    Institute of Scientific and Technical Information of China (English)

    RAO Hong

    2012-01-01

    The ±800 kV ultra high voltage direct current (UHVDC) transmission system is an extraordinary challenge to system design and equipment manufacture. China Southern Power Grid Company (CSG) organized research and design for the construction of Yunnan-Guangdong ±800 kV UHVDC project (YG UHVDC project), and got large technical breakthroughs and advanced technologies for ±800 kV UHVDC transmission systems. These advanced technologies include power system stability, main electrical wiring, overvoltage and insulation coordination, external insulation, electromagnetic environment, control and protection, and arrangement of the main equipments. Meanwhile, CSG led the researches on specification of main equipments, such as converter valve, converter transformer, dry-type smooth reactor and others involved in the whole process management of equipment supervisions. The YG UHVDC project was put into commercial operation in 2010 as the first pilot ±800 kV UHVDC project in the world. The whole system operated in a stable and smooth manner, and the UHVDC equipment and control systems passed the test under the practical operation in CSG bulk power system, which shows that the design and research objectives were achieved.

  2. Functional design criteria for Project W-252, Phase II Liquid Effluent Treatment and Disposal: Revision 1

    International Nuclear Information System (INIS)

    This document provides the functional design criteria required for the Phase 2 Liquid Effluent Treatment and Disposal Project, Project W-252. Project W-252 shall provide new facilities and existing facility modifications required to implement Best Available Technology/All Known, Available, and Reasonable Methods of Prevention, Control, and Treatment (BAT/AKART) for the 200 East Phase II Liquid Effluent Streams. The project will also provide a 200 East Area Phase II Effluent Collection System (PTECS) for connection to a disposal system for relevant effluent streams to which BAT/AKART has been applied. Liquid wastestreams generated in the 200 East Area are currently discharged to the soil column. Included in these wastestreams are cooling water, steam condensate, raw water, and sanitary wastewaters. It is the policy of the DOE that the use of soil columns to treat and retain radionuclides and nonradioactive contaminants be discontinued at the earliest practical time in favor of wastewater treatment and waste minimization. In 1989, the DOE entered into an interagency agreement with Ecology and EPA. This agreement is referred to as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Project W-252 is one of the projects required to achieve the milestones set forth in the Tri-Party Agreement. One of the milestones requires BAT/AKART implementation for Phase II streams by October 1997. This Functional Design Criteria (FDC) document provides the technical baseline required to initiate Project W-252 to meet the Tri-Party Agreement milestone for the application of BAT/AKART to the Phase II effluents

  3. 76 FR 11522 - South Carolina Electric and Gas Company (SCE&G) and the South Carolina Public Service Authority...

    Science.gov (United States)

    2011-03-02

    ... COMMISSION South Carolina Electric and Gas Company (SCE&G) and the South Carolina Public Service Authority... Carolina Electric and Gas Company (SCE&G) acting as itself and agent for the South Carolina Public Service... not have access to ADAMS, or who encounter problems in accessing the documents located in...

  4. Systemic Design in AgroFood Sector: EN.FA.SI project

    OpenAIRE

    Barbero, Silvia; Tamborrini, Paolo Marco

    2012-01-01

    The EN.FA.SI. project (l'ENergia e il FAgiolo in SIstema), supported by the Piedmont Region with POR-FESR 2007-13 funds on productive transition and innovation, aims to develop a specific area in the North West of Italy (province of Cuneo) through a process of designing for food. The project will have a strong impact on: -the Environment: land conservation, protection of soil and native species, the consolidation of local culture, clean industrial processes, and efficient logistics; - the Eco...

  5. The Pliocene Model Intercomparison Project (PlioMIP) Phase 2: Scientific objectives and experimental design

    Science.gov (United States)

    Haywood, Alan M.; Dowsett, Harry J.; Dolan, Aisling M.; Rowley, David; Abe-Ouchi, Ayako; Otto-Bliesner, Bette; Chandler, Mark A.; Hunter, Stephen J.; Lunt, Daniel J.; Pound, Matthew; Salzmann, Ulrich

    2016-01-01

    The Pliocene Model Intercomparison Project (PlioMIP) is a co-ordinated international climate modelling initiative to study and understand climate and environments of the Late Pliocene, as well as their potential relevance in the context of future climate change. PlioMIP examines the consistency of model predictions in simulating Pliocene climate and their ability to reproduce climate signals preserved by geological climate archives. Here we provide a description of the aim and objectives of the next phase of the model intercomparison project (PlioMIP Phase 2), and we present the experimental design and boundary conditions that will be utilized for climate model experiments in Phase 2. 

  6. Nuclear cluster strategy Carolinas - Ontario - Saskatchewan

    International Nuclear Information System (INIS)

    Organization of Candu Industries (OCI) is an industry association representing the interests of 170 private sector suppliers of products and services to the Canadian and offshore nuclear industries. OCI member companies, mainly in Ontario, employ over 30,000 highly specialized workers with over 12,000 working in nuclear area. OCI's objectives are to sustain the domestic nuclear program by building support among political leaders, the public and local communities, assist OCI member companies in becoming the preferred suppliers for domestic nuclear projects (competitive), assist OCI member companies in international nuclear markets - trade missions and vendor workshops. OCI is at the heart of an 'Ontario nuclear cluster'. The Carolinas have shown what can be achieved when industry, academia, S&T centers and governments collaborate with a shared vision to achieve a common goals. Ontario has the assets to become a stronger center for nuclear excellence. OCI is working to bring the pieces together. Saskatchewan has the assets to become a center of excellence in Small Modular Reactors (SMR) by licensing and constructing the first SMR in Canada.

  7. TUNL XIX. Annual report, January 1-December 31, 1980. [North Carolina State Univ. activities at TUNL

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    Research performed by North Carolina State University personnel at TUNL is highlighted in this report, which is actually the complete TUNL progress report for 1980. Studies in the areas of neutron cross sections, neutron polarization, radiative capture, atomic physics and development activities are included. One may expect completed projects to be reported in physics journals or conference proceedings. (RWR)

  8. 77 FR 10491 - Progress Energy Carolinas, Inc.; Notice of Application for Amendment of License and Soliciting...

    Science.gov (United States)

    2012-02-22

    .... d. Applicant: Progress Energy Carolinas, Inc. e. Name of Project: Yadkin-Pee Dee Hydroelectric... system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at...

  9. The Geoengineering Model Intercomparison Project Phase 6 (GeoMIP6: simulation design and preliminary results

    Directory of Open Access Journals (Sweden)

    B. Kravitz

    2015-10-01

    Full Text Available We present a suite of new climate model experiment designs for the Geoengineering Model Intercomparison Project (GeoMIP. This set of experiments, named GeoMIP6 (to be consistent with the Coupled Model Intercomparison Project Phase 6, builds on the previous GeoMIP project simulations, and has been expanded to address several further important topics, including key uncertainties in extreme events, the use of geoengineering as part of a portfolio of responses to climate change, and the relatively new idea of cirrus cloud thinning to allow more longwave radiation to escape to space. We discuss experiment designs, as well as the rationale for those designs, showing preliminary results from individual models when available. We also introduce a new feature, called the GeoMIP Testbed, which provides a platform for simulations that will be performed with a few models and subsequently assessed to determine whether the proposed experiment designs will be adopted as core (Tier 1 GeoMIP experiments. This is meant to encourage various stakeholders to propose new targeted experiments that address their key open science questions, with the goal of making GeoMIP more relevant to a broader set of communities.

  10. The Geoengineering Model Intercomparison Project Phase 6 (GeoMIP6): simulation design and preliminary results

    Science.gov (United States)

    Kravitz, B.; Robock, A.; Tilmes, S.; Boucher, O.; English, J. M.; Irvine, P. J.; Jones, A.; Lawrence, M. G.; MacCracken, M.; Muri, H.; Moore, J. C.; Niemeier, U.; Phipps, S. J.; Sillmann, J.; Storelvmo, T.; Wang, H.; Watanabe, S.

    2015-10-01

    We present a suite of new climate model experiment designs for the Geoengineering Model Intercomparison Project (GeoMIP). This set of experiments, named GeoMIP6 (to be consistent with the Coupled Model Intercomparison Project Phase 6), builds on the previous GeoMIP project simulations, and has been expanded to address several further important topics, including key uncertainties in extreme events, the use of geoengineering as part of a portfolio of responses to climate change, and the relatively new idea of cirrus cloud thinning to allow more longwave radiation to escape to space. We discuss experiment designs, as well as the rationale for those designs, showing preliminary results from individual models when available. We also introduce a new feature, called the GeoMIP Testbed, which provides a platform for simulations that will be performed with a few models and subsequently assessed to determine whether the proposed experiment designs will be adopted as core (Tier 1) GeoMIP experiments. This is meant to encourage various stakeholders to propose new targeted experiments that address their key open science questions, with the goal of making GeoMIP more relevant to a broader set of communities.

  11. The Geoengineering Model Intercomparison Project Phase 6 (GeoMIP6). Simulation Design and Preliminary Results

    Energy Technology Data Exchange (ETDEWEB)

    Kravitz, Benjamin S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Robock, Alan [Rutgers Univ., New Brunswick, NJ (United States); Tilmes, S. [National Center for Atmospheric Research, Boulder, CO (United States); Boucher, Olivier [Laboratoire de Meteorologie Dynamique, Paris (France); English, J. [NOAA Earth System Research Lab. and Univ. of Colorado, Boulder, CO (United States); Irvine, Peter [Inst. of Advanced Sustainability Studies, Potsdam (Germany); Jones, Andrew [Met Office Hadley Centre, Exeter (United Kingdom); Lawrence, M. G. [Inst. of Advanced Sustainability Studies, Potsdam (Germany); Maccracken, Michael C. [Climate Inst., Washington, DC (United States); Muri, Helene O. [Univ. of Oslo (Norway); Moore, John [Beijing Normal Univ., Beijing (China); Niemeier, Ulrike [Max Planck Inst. for Meterology, Hamburg (Germany); Phipps, Steven [Univ. of New South Wales, Sydney, NSW (Australia); Sillmann, Jana [Center for International Climate and Environmental Research, Oslo (Norway); Storelvmo, Trude [Yale Univ., New Haven, CT (United States); Wang, Hailong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Watanabe, Shingo [Japan Agency for Marine-Earth Science and Technology, Yokohama (Japan)

    2015-10-27

    We present a suite of new climate model experiment designs for the Geoengineering Model Intercomparison Project (GeoMIP). This set of experiments, named GeoMIP6 (to be consistent with the Coupled Model Intercomparison Project Phase 6), builds on the previous GeoMIP project simulations, and has been expanded to address several further important topics, including key uncertainties in extreme events, the use of geoengineering as part of a portfolio of responses to climate change, and the relatively new idea of cirrus cloud thinning to allow more longwave radiation to escape to space. We discuss experiment designs, as well as the rationale for those designs, showing preliminary results from individual models when available. We also introduce a new feature, called the GeoMIP Testbed, which provides a platform for simulations that will be performed with a few models and subsequently assessed to determine whether the proposed experiment designs will be adopted as core (Tier 1) GeoMIP experiments. This is meant to encourage various stakeholders to propose new targeted experiments that address their key open science questions, with the goal of making GeoMIP more relevant to a broader set of communities.

  12. Calculator: A Hardware Design, Math and Software Programming Project Base Learning

    Directory of Open Access Journals (Sweden)

    F. Criado

    2015-03-01

    Full Text Available This paper presents the implementation by the students of a complex calculator in hardware. This project meets hardware design goals, and also highly motivates them to use competences learned in others subjects. The learning process, associated to System Design, is hard enough because the students have to deal with parallel execution, signal delay, synchronization … Then, to strengthen the knowledge of hardware design a methodology as project based learning (PBL is proposed. Moreover, it is also used to reinforce cross subjects like math and software programming. This methodology creates a course dynamics that is closer to a professional environment where they will work with software and mathematics to resolve the hardware design problems. The students design from zero the functionality of the calculator. They are who make the decisions about the math operations that it is able to resolve it, and also the operands format or how to introduce a complex equation into the calculator. This will increase the student intrinsic motivation. In addition, since the choices may have consequences on the reliability of the calculator, students are encouraged to program in software the decisions about how implement the selected mathematical algorithm. Although math and hardware design are two tough subjects for students, the perception that they get at the end of the course is quite positive.

  13. Inquiry-Based Educational Design for Large-Scale High School Astronomy Projects Using Real Telescopes

    Science.gov (United States)

    Fitzgerald, Michael; McKinnon, David H.; Danaia, Lena

    2015-12-01

    In this paper, we outline the theory behind the educational design used to implement a large-scale high school astronomy education project. This design was created in response to the realization of ineffective educational design in the initial early stages of the project. The new design follows an iterative improvement model where the materials and general approach can evolve in response to solicited feedback. The improvement cycle concentrates on avoiding overly positive self-evaluation while addressing relevant external school and community factors while concentrating on backward mapping from clearly set goals. Limiting factors, including time, resources, support and the potential for failure in the classroom, are dealt with as much as possible in the large-scale design allowing teachers the best chance of successful implementation in their real-world classroom. The actual approach adopted following the principles of this design is also outlined, which has seen success in bringing real astronomical data and access to telescopes into the high school classroom.

  14. The Design and Development of a Computerized Tool Support for Conducting Senior Projects in Software Engineering Education

    Science.gov (United States)

    Chen, Chung-Yang; Teng, Kao-Chiuan

    2011-01-01

    This paper presents a computerized tool support, the Meetings-Flow Project Collaboration System (MFS), for designing, directing and sustaining the collaborative teamwork required in senior projects in software engineering (SE) education. Among many schools' SE curricula, senior projects serve as a capstone course that provides comprehensive…

  15. Improving patient and project outcomes using interorganisational innovation, collaboration and co-design.

    Science.gov (United States)

    Evans, Liz; Green, Stuart; Howe, Cathy; Sharma, Kiran; Marinho, Fatima; Bell, Derek; Thomas, Paul

    2014-01-01

    Background Common mental disorders (CMDs) are a leading cause of disability. The Department of Health has launched a large-scale initiative to improve access to evidence-based psychological treatments, such as cognitive behavioural therapy (CBT), through the Improving Access to Psychological Therapy (IAPT) programme. Access to IAPT services by black and minority ethnic (BME) communities is lower than for other groups. Setting The London Borough of Ealing in west London; a diverse borough with areas of high BME population and relatively high deprivation. Aim To compare the outcomes of two linked quality improvement (QI) projects undertaken by Ealing Mental Health and Wellbeing Service (MHWBS), both with the same aim of increasing access to talking therapies for BME communities. Methods Application of QI methodologies supported by the NIHR CLAHRC for northwest London in two different settings in Ealing. One, the 'Southall project', was set within a wider initiative for collaborative improvements and shared learning (the Southall Initiative for Integrated Care) in an ethnically diverse area of Ealing; it was undertaken between April 2010 and September 2011. The second, 'the Ealing project', operated in the two other Ealing localities that did not have the advantage of a broader initiative for collaborative improvements; it was undertaken between April 2011 and September 2012. Results Comparison of the monthly referral rates of BME patients (standardised per 10 000 general practitioner (GP)-registered patients) show that the Southall project was more effective in increasing referrals from BME communities than the Ealing project. Conclusion Broad local participation and ownership in the project design of the Southall project may explain why it was more effective in achieving its aims than the Ealing project which lacked these ownership-creating mechanisms.

  16. [Workshop for coordinating South Carolina`s pre-college systemic initiatives in science and mathematics

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    On December 19, 1991, South Carolina`s Governor, established the Governor`s Mathematics and Sciences Advisory Board (MSAB) to articulate a vision and develop a statewide plan for improving science and mathematics education in South Carolina. The MSAB recognized that systemic change must occur if the achievement levels of students in South Carolina are to improve in a dramatic way. The MSAB holds two fundamental beliefs about systemic change: (1) All the elements of the science and mathematics education system must be working in harmony towards the same vision; and (2) Each element of the system must be held against high standards and progress must be assessed regularly against these standards.

  17. Teaching, Doing, and Sharing Project Management in a Studio Environment: The Development of an Instructional Design Open-Source Project Management Textbook

    Science.gov (United States)

    Randall, Daniel L.; Johnson, Jacquelyn C.; West, Richard E.; Wiley, David A.

    2013-01-01

    In this article, the authors present an example of a project-based course within a studio environment that taught collaborative innovation skills and produced an open-source project management textbook for the field of instructional design and technology. While innovation plays an important role in our economy, and many have studied how to teach…

  18. The Career Path to Instructional Design Project Management: An Expert Perspective from the US Professional Services Sector

    Science.gov (United States)

    Williams van Rooij, Shahron

    2013-01-01

    There are well-documented competency standards for instructional/training designers and for project managers. However, there is little research about what skills and abilities employers expect from those seeking to become instructional/training design project managers, particularly within specific industry sectors. Focusing on the US professional…

  19. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  20. Engineering design and economic evaluation of a family-sized biogas project in Nigeria

    International Nuclear Information System (INIS)

    To woo householders into harnessing the cooking energy potential of biogas in order to solve the perennial cooking energy problems at household level in Nigeria, this paper carried out the engineering design requirement, and used the discounted cash flow micro-economic assessments to evaluate the 6.0 m3 family-sized biogas project in Nigeria. The project has an initial investment cost of 41,088 Naira, annual expenditure of 5909 Naira and an annual benefit of 13,347 Naira. The NPV, IRR, B/C and payback period of financial analysis are 0.050 million Naira, 17.52%, 2.26 and 6.6 years respectively. This shows that the 6.0 m3 family-sized biogas project using cattle dung as substrate in Nigeria has a good economic potential. (author)

  1. Guiding science expeditions: The design of a learning environment for project-based science

    Science.gov (United States)

    Polman, Joseph Louis

    Project-based pedagogy has been revived recently as a teaching strategy for promoting students' active engagement in learning science by doing science. Numerous reform efforts have encouraged project-based teaching in high schools, along with a range of supports for its implementation, often including computers and the Internet. History has shown, however, that academic research and new technologies are not enough to effect real change in classrooms. Ultimately, teachers accomplish activity with their students daily in classrooms. Putting the idea of project-based teaching into practice depends on many particulars of teachers' situated work with students. To better understand the complexity of project-based science teaching in schools, I conducted an interpretive case study of one exceptional teacher's work. The teacher devotes all class time after the beginning of the year to open-ended, student-designed Earth Science research projects. Over four years of involvement with the Learning through Collaborative Visualization (CoVis) reform effort, this teacher has developed, implemented, and refined strategies for supporting and guiding students in conducting open-ended inquiry. Through a close examination of the teacher's work supporting student projects, I explore the design issues involved in such an endeavor, including affordances, constraints, and tradeoffs. In particular, I show how time constrains both student and teacher action, how the traditional school culture and grading create stumbling blocks for change, and how conflicting beliefs about teaching and learning undermine the accomplishment of guided inquiry. I also show how Internet tools including Usenet news, email, and the World Wide Web afford students an opportunity to gather and make use of distributed expertise and scientific data resources; how an activity structure, combined with a corresponding structure to the artifact of the final written product, supports student accomplishment of unfamiliar

  2. The Influence of Clientsâ Qualities on Green Design Performance of Building Projects in Malaysia-Descriptive Study

    OpenAIRE

    Mohamed S. Elforgani; Ismail Rahmat

    2012-01-01

    Problem statement: In the construction industry, success of building projects greatly depends on the clientâs performance. The performance of clients is crucial since decisions made will influence the overall project performance. Typically, clients are represented by managerial and technical representatives during the design process. They play major roles in conveying required information to the design team regarding their future project. The quality of clientsâ representatives has potential ...

  3. Design reality gap issues within an ICT4D project:an assessment of Jigawa State Community Computer Center

    OpenAIRE

    Kanya, Rislana Abdulazeez; Good, Alice

    2013-01-01

    This paper evaluates the Jigawa State Government Community Computer centre project using the design reality gap framework. The purpose of this was to analyse the shortfall between design expectations and implementation realities, in order to find out the current situation of the project. Furthermore to analyse whether it would meet the key stakeholder’s expectation. The Majority of Government ICT Projects is classified as either failure or partial failure. Our research will underpin a case st...

  4. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  5. Conceptual Design Report for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; David Duncan; Joan Connolly; Margaret Hinman; Charles Marcinkiewicz; Gary Mecham

    2011-03-01

    This conceptual design report addresses development of replacement remote-handled low-level waste disposal capability for the Idaho National Laboratory. Current disposal capability at the Radioactive Waste Management Complex is planned until the facility is full or until it must be closed in preparation for final remediation (approximately at the end of Fiscal Year 2017). This conceptual design report includes key project assumptions; design options considered in development of the proposed onsite disposal facility (the highest ranked alternative for providing continued uninterrupted remote-handled low level waste disposal capability); process and facility descriptions; safety and environmental requirements that would apply to the proposed facility; and the proposed cost and schedule for funding, design, construction, and operation of the proposed onsite disposal facility.

  6. Experimental design for three interrelated Marine Ice-Sheet and Ocean Model Intercomparison Projects

    Science.gov (United States)

    Asay-Davis, X. S.; Cornford, S. L.; Durand, G.; Galton-Fenzi, B. K.; Gladstone, R. M.; Gudmundsson, G. H.; Hattermann, T.; Holland, D. M.; Holland, D.; Holland, P. R.; Martin, D. F.; Mathiot, P.; Pattyn, F.; Seroussi, H.

    2015-11-01

    Coupled ice sheet-ocean models capable of simulating moving grounding lines are just becoming available. Such models have a broad range of potential applications in studying the dynamics of marine ice sheets and tidewater glaciers, from process studies to future projections of ice mass loss and sea level rise. The Marine Ice Sheet-Ocean Model Intercomparison Project (MISOMIP) is a community effort aimed at designing and coordinating a series of model intercomparison projects (MIPs) for model evaluation in idealized setups, model verification based on observations, and future projections for key regions in the West Antarctic Ice Sheet (WAIS). Here we describe computational experiments constituting three interrelated MIPs for marine ice sheet models and regional ocean circulation models incorporating ice shelf cavities. These consist of ice sheet experiments under the Marine Ice Sheet MIP third phase (MISMIP+), ocean experiments under the ice shelf-ocean MIP second phase (ISOMIP+) and coupled ice sheet-ocean experiments under the MISOMIP first phase (MISOMIP1). All three MIPs use a shared domain with idealized bedrock topography and forcing, allowing the coupled simulations (MISOMIP1) to be compared directly to the individual component simulations (MISMIP+ and ISOMIP+). The experiments, which have qualitative similarities to Pine Island Glacier Ice Shelf and the adjacent region of the Amundsen Sea, are designed to explore the effects of changes in ocean conditions, specifically the temperature at depth, on basal melting and ice dynamics. In future work, differences between model results will form the basis for evaluation of the participating models.

  7. A novel design project for space solar power station (SSPS-OMEGA)

    Science.gov (United States)

    Yang, Yang; Zhang, Yiqun; Duan, Baoyan; Wang, Dongxu; Li, Xun

    2016-04-01

    The space solar power station (SSPS) capable of providing earth with primary power has been researched for 50 years. The SSPS is a tremendous design involving optics, mechanics, electromagnetism, thermology, control, and other disciplines. This paper presents a novel design project for SSPS named OMEGA. The space segment of the proposed GEO-based SSPS is composed of four main parts, such as spherical solar power collector, hyperboloid photovoltaic (PV) cell array, power management and distribution (PMAD) and microwave transmitting antenna. Principle of optics, structure configuration, wired and wireless power transmissions are presented.

  8. Revising a design course from a lecture approach to a project-based learning approach

    Science.gov (United States)

    Kunberger, Tanya

    2013-06-01

    In order to develop the evaluative skills necessary for successful performance of design, a senior, Geotechnical Engineering course was revised to immerse students in the complexity of the design process utilising a project-based learning (PBL) approach to instruction. The student-centred approach stresses self-directed group learning, which focuses on the process rather than the result and underscores not only the theoretical but also the practical constraints of a problem. The shift in course emphasis, to skills over concepts, results in reduced content coverage but increased student ability to independently acquire a breadth of knowledge.

  9. Using Design as Boundary Spanner Object in Climate Change Mitigation Projects

    Directory of Open Access Journals (Sweden)

    Walter Fernandez

    2010-01-01

    Full Text Available Climate change is a growing concern for society and the focus of numerous research initiatives across multiple fields of science. These initiatives often need to capitalize on the cross-specialized knowledge contributed by researchers from very different fields. The diversity of worldviews among key stakeholders requires an effective overall design strategy acting as a boundary spanner object. This study presents an account of the issues faced by a multidisciplinary research project and discusses the suitability of a design approach to help address issues such as equality, empowerment, autonomy, creativity, performance, reduction of innovation cycle times and also provide for the necessary balance between control, speediness and flexibility.

  10. Quality Improvement Project to Improve Patient Satisfaction With Pain Management: Using Human-Centered Design.

    Science.gov (United States)

    Trail-Mahan, Tracy; Heisler, Scott; Katica, Mary

    2016-01-01

    In this quality improvement project, our health system developed a comprehensive, patient-centered approach to improving inpatient pain management and assessed its impact on patient satisfaction across 21 medical centers. Using human-centered design principles, a bundle of 6 individual and team nursing practices was developed. Patient satisfaction with pain management, as measured by the Hospital Consumer Assessment of Healthcare Providers and Systems pain composite score, increased from the 25th to just under the 75th national percentile.

  11. The Business Case for Sustainable Design - the City of Melbourne CH2 Project

    OpenAIRE

    Peter Stewart; Jon Robinson; Sowfun Low

    2012-01-01

    The City of Melbourne's landmark building development project.referred to as Council House 2 (CH2) is to be completed during2006. CH2 is a world leading six star environmental buildingincorporating sustainable technologies and producing financial.environmental and societal benefits. The business case forsustainable design within the context of CH2 is examined . Anoverview is carried out of traditional business case decisionmaking tools used in the context of property development. Thecase for ...

  12. Quality Improvement Project to Improve Patient Satisfaction With Pain Management: Using Human-Centered Design.

    Science.gov (United States)

    Trail-Mahan, Tracy; Heisler, Scott; Katica, Mary

    2016-01-01

    In this quality improvement project, our health system developed a comprehensive, patient-centered approach to improving inpatient pain management and assessed its impact on patient satisfaction across 21 medical centers. Using human-centered design principles, a bundle of 6 individual and team nursing practices was developed. Patient satisfaction with pain management, as measured by the Hospital Consumer Assessment of Healthcare Providers and Systems pain composite score, increased from the 25th to just under the 75th national percentile. PMID:26447343

  13. Designing Internet Learning for Novice Users -Paper Based on a Action Research Project In India

    DEFF Research Database (Denmark)

    Purushothaman, Aparna

    2012-01-01

    The paper centre on an Action Research project undertaken in India for enabling the female students empowered through Internet use. The paper will discuss the design elements of Internet training for the first time users with limited Internet access based on Blooms Digital Taxonomy of Learning...... Domains.The paper also illustrates the identity formation of students, through learning to use Internet, using wengers social theory of learning with the empirical data....

  14. SLUDGE TREATMENT PROJECT ENGINEERED CONTAINER RETRIEVAL AND TRANSFER SYSTEM PRELIMINARY DESIGN HAZARD ANALYSIS SUPPLEMENT 1

    Energy Technology Data Exchange (ETDEWEB)

    FRANZ GR; MEICHLE RH

    2011-07-18

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  15. Design, Implementation and Evaluation of a Mobile GIS Solution for a Land Registration Project in Lesotho

    OpenAIRE

    Bronder, Axel; Persson, Erik

    2013-01-01

    This thesis describes in detail how a mobile Geographical Information System (GIS) was designed, implemented and evaluated for the prevailing circumstances of a land regularisation project in Lesotho in Southern Africa. The GIS was developed as an application for the Android platform, primarily with the tablet-computer format in mind, to be used for land registration field work. The main purpose of the paper is to determine whether an ad hoc mobile GIS solution can improve the efficiency of t...

  16. Microlens array-based high-gain screen design for direct projection head-up displays

    OpenAIRE

    Hedili, M. Kıvanç; Ürey, Hakan; Freeman, Mark O.

    2013-01-01

    Microlens array-based high-gain screen design for direct projection head-up displays M. Kivanc Hedili,1 Mark O. Freeman,2 and Hakan Urey1,* 1Optical Microsystems Laboratory, Koc University, Rumelifeneri Yolu, Sarıyer, İstanbul 34450, Turkey 2Lost Lake Technology LLC, 21623 W. Lost Lake Rd., Snohomish, Washington 98296, USA *Corresponding author: Received 2 October 2012; revised 28 December 2012; accepted 29 December 2012; posted 18 January 2013 (Doc. ID 17...

  17. 2011 South Carolina DNR Lidar: York County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Towill Inc. collected LiDAR for over 3,500 square miles in York, Pickens, Anderson, and Oconee Counties in South Carolina. This metadata covers the LiDAR produced...

  18. 2012 South Carolina DNR Lidar: Calhoun County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Towill Inc. collected LiDAR for over 3,300 square miles in Calhoun, Aiken, Barnwell, Edgefield, McCormick, and Abbeville counties in South Carolina. This metadata...

  19. 2012 South Carolina DNR Lidar: Abbeville County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Towill Inc. collected LiDAR for over 3,300 square miles in Calhoun, Aiken, Barnwell, Edgefield, McCormick, and Abbeville counties in South Carolina. This metadata...

  20. 2012 South Carolina DNR Lidar: Edgefield County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Towill Inc. collected LiDAR for over 3,300 square miles in Calhoun, Aiken, Barnwell, Edgefield, McCormick, and Abbeville counties in South Carolina. This metadata...