WorldWideScience

Sample records for capsule dismantling apparatus

  1. Method and apparatus for dismantling mechanical anchors

    Energy Technology Data Exchange (ETDEWEB)

    Dubovskiy, Yu P; Chendev, F S; Gritsayuk, B I; Gubin, N I; Osipov, S P

    1982-01-01

    This apparatus is designed to reduce the amount of labor required to dismantle mechanical anchors while at the same time lowering expenditures for lumber. Longwall beams and timber skips are used to support the cap and any fractured rock faces. The apparatus itself has grooves, vertical guides, and a drive system to position the longwall beams.

  2. Method and apparatus for dismantling and disposing of fuel assemblies

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Schulties, J.R.

    1985-01-01

    This invention relates to apparatus and a method for dismantling, shearing, and compacting a fuel assembly frame skeleton. It uses an apparatus capable of hanging or being supported in the transfer canal of the spent fuel pit of the fuel handling building. This apparatus includes a bottom nozzle shear which is held under water to shear off the bottom nozzle and convey it to a scrap transfer bin. Then the remaining portion is brought to a skeleton compactor and shear, also held under water. The compacted skeleton is sheared into a number of smaller portions. After compacting and shearing, the individual portions are fed to the scrap transfer bin. The compacted and sheared skeleton assembly may be placed into a container that is adapted to hold four skeletons for off-site removal

  3. Mock-up test of remote controlled dismantling apparatus for large-sized vessels (contract research)

    Energy Technology Data Exchange (ETDEWEB)

    Myodo, Masato; Miyajima, Kazutoshi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Okane, Shogo [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2001-03-01

    The Remote dismantling apparatus, which is equipped with multi-units for functioning of washing, cutting, collection of cut pieces and so on, has been constructed to dismantle the large-sized vessels in the JAERI's Reprocessing Test Facility (JRTF). The apparatus has five-axis movement capability and its operation is performed remotely. The mock-up tests were performed to evaluate the applicability of the apparatus to actual dismantling activities by using the mock-ups of LV-3 and LV-5 in the facility. It was confirmed that each unit was satisfactory functioned by remote operation. Efficient procedures for dismantling the large-sized vessel was studied and various date was obtained in the mock-up tests. This apparatus was found to be applicable for the actual dismantling activity in JRTF. (author)

  4. Mock-up test of remote controlled dismantling apparatus for large-sized vessels (contract research)

    International Nuclear Information System (INIS)

    Myodo, Masato; Miyajima, Kazutoshi; Okane, Shogo

    2001-03-01

    The Remote dismantling apparatus, which is equipped with multi-units for functioning of washing, cutting, collection of cut pieces and so on, has been constructed to dismantle the large-sized vessels in the JAERI's Reprocessing Test Facility (JRTF). The apparatus has five-axis movement capability and its operation is performed remotely. The mock-up tests were performed to evaluate the applicability of the apparatus to actual dismantling activities by using the mock-ups of LV-3 and LV-5 in the facility. It was confirmed that each unit was satisfactory functioned by remote operation. Efficient procedures for dismantling the large-sized vessel was studied and various date was obtained in the mock-up tests. This apparatus was found to be applicable for the actual dismantling activity in JRTF. (author)

  5. Method and apparatus for dispensing small quantities of mercury from evacuated and sealed glass capsules

    Science.gov (United States)

    Grossman, Mark W.; George, William A.; Pai, Robert Y.

    1985-01-01

    A technique for opening an evacuated and sealed glass capsule containing a material that is to be dispensed which has a relatively high vapor pressure such as mercury. The capsule is typically disposed in a discharge tube envelope. The technique involves the use of a first light source imaged along the capsule and a second light source imaged across the capsule substantially transversely to the imaging of the first light source. Means are provided for constraining a segment of the capsule along its length with the constraining means being positioned to correspond with the imaging of the second light source. These light sources are preferably incandescent projection lamps. The constraining means is preferably a multiple looped wire support.

  6. Dismantling techniques

    International Nuclear Information System (INIS)

    Wiese, E.

    1998-01-01

    Most of the dismantling techniques used in a Decontamination and Dismantlement (D and D) project are taken from conventional demolition practices. Some modifications to the techniques are made to limit exposure to the workers or to lessen the spread of contamination to the work area. When working on a D and D project, it is best to keep the dismantling techniques and tools as simple as possible. The workers will be more efficient and safer using techniques that are familiar to them. Prior experience with the technique or use of mock-ups is the best way to keep workers safe and to keep the project on schedule

  7. Dismantling techniques

    Energy Technology Data Exchange (ETDEWEB)

    Wiese, E.

    1998-03-13

    Most of the dismantling techniques used in a Decontamination and Dismantlement (D and D) project are taken from conventional demolition practices. Some modifications to the techniques are made to limit exposure to the workers or to lessen the spread of contamination to the work area. When working on a D and D project, it is best to keep the dismantling techniques and tools as simple as possible. The workers will be more efficient and safer using techniques that are familiar to them. Prior experience with the technique or use of mock-ups is the best way to keep workers safe and to keep the project on schedule.

  8. [Design of extracorporeal apparatus of capsule endoscopy based on ARM+FPGA].

    Science.gov (United States)

    Wang, Shenghua; Zhang, Sijie; Wang, Yue; Wang, Zhenxing

    2011-10-01

    Considering that the patients would bear the annoyance of fixed posture for long time when they are examined with gastrointestinal wireless endoscopy, even though portable devices have been developed, the treatments still depend on PC so much, we proposed an embedded solution based on ARM + FPGA. It used embedded ARM9 S3C2440 as processor core, collected images from digestive tract through capsule endoscopy which can be swallowed down there, and wirelessly transferred these images to the receiving system, then used video decoder chip SAA7114H for analog of NTSC video image decode. And under FPGA's logic controlling, effective digital video signal was transferred to S3C2440 for further treatment. Finally within the embedded Linux environment, we programmed the visual user interfaces using the QT/Embedded, realizing the offline record of the real-time video images of digestive tract portable and preferences. It can make patients move more freely and even without PC when examining. In addition, the method greatly improves the efficiency of the doctor, and is more intelligent and with more humane nature.

  9. The challenges of dismantling

    International Nuclear Information System (INIS)

    Sene, Monique; Lheureux, Yves; Leroyer, Veronique; Rollinger, Francois; Gauthier, Florence; Depauw, Denis; Reynal, Nathalie; Fraysse, Thierry; Burger, Eric; Bertrand, Adrien; Vallat, Christophe; Bernet, Philippe; Eimer, Michel; Boutin, Dominique; Bietrix, Philippe; Richard, Francoise; Piketty, Laurence; Mouchet, Chantal; Charre, Jean-Pierre

    2014-01-01

    This document gathers Power Point presentations which address the contexts and challenges of dismantling (legal framework, safety and radiation protection challenges, waste processing industry), and propose illustrations of dismantling challenges (example of operations to prepare EURODIF dismantling and CLIGEET work-group on EURODIF dismantling, examples of dismantling of EDF installations and CLIs' opinion on the dismantling of EDF installations, Brennilis dismantling follow-up performed by the CLI, examples of dismantling of CEA installations and opinion of a CLI on the dismantling of CEA installations)

  10. Use of plyometric trainings in physical rehabilitation of athletes in playing sports with injuries of the capsule-ligament apparatus of knee

    Directory of Open Access Journals (Sweden)

    Moh'd Khalil Moh'd Abdel Kader.

    2012-06-01

    Full Text Available The question of possibility of application is considered in the programs of physical rehabilitation of the special physical exercises for the athletes in playing sports with the damage of knee-joint. An analysis and generalization of scientific-methodical information on questions of mechanisms and features of origin of sporting traumas, and also modern facilities and methods of renewal at the traumas of the capsule-ligament apparatus of knee is conducted. It is set that in the modern methods of physical rehabilitation of sportsmen with the traumas of locomotorium the complex programs do not meet with the use of plyometric exercises. Their application is instrumental in the prophylaxis of origin of recurrent sporting traumas, renewal of the special capacity and speed-power qualities of athletes.

  11. Dismantling technologies trends

    International Nuclear Information System (INIS)

    Devaux, P.

    2009-01-01

    In this work dismantling technologies trends realized by the CEA are reviewed. There following technologies are presented: Data acquisition from facilities; Scenario studies; Remote handling and carriers; Dismantling techniques; Decontamination.

  12. EDF's dismantling experience

    International Nuclear Information System (INIS)

    Mira, J.J.

    1993-01-01

    The dismantling policy at EDF, taking into account technical, economical and socio-political factors, is presented. The various current realizations are reviewed and their dismantling solution discussed: Chinon A2, Chinon A1, Marcoule G1, G2, G3, Brennilis (EL4). Several dismantling projects are also described (Chinon A3, St-Laurent A1-A2, Chooz A). The various dismantling operations are presented and scheduled

  13. Dismantling of nuclear facilities

    International Nuclear Information System (INIS)

    Tallec, M.; Kus, J.P.

    2009-01-01

    Nuclear facilities have a long estimable lifetime but necessarily limited in time. At the end of their operation period, basic nuclear installations are the object of cleansing operations and transformations that will lead to their definitive decommissioning and then to their dismantling. Because each facility is somewhere unique, cleansing and dismantling require specific techniques. The dismantlement consists in the disassembly and disposing off of big equipments, in the elimination of radioactivity in all rooms of the facility, in the demolition of buildings and eventually in the reconversion of all or part of the facility. This article describes these different steps: 1 - dismantling strategy: main de-construction guidelines, expected final state; 2 - industries and sites: cleansing and dismantling at the CEA, EDF's sites under de-construction; 3 - de-construction: main steps, definitive shutdown, preparation of dismantling, electromechanical dismantling, cleansing/decommissioning, demolition, dismantling taken into account at the design stage, management of polluted soils; 4 - waste management: dismantlement wastes, national policy of radioactive waste management, management of dismantlement wastes; 5 - mastery of risks: risk analysis, conformability of risk management with reference documents, main risks encountered at de-construction works; 6 - regulatory procedures; 7 - international overview; 8 - conclusion. (J.S.)

  14. Challenges of dismantling

    International Nuclear Information System (INIS)

    Chevet, P.F.; Schilz, F.; Rondeau, J.M.; Piketty, L.; Dupraz, B.; Conte, D.; Duguey, M.; Louet, C.A.; Dorison, A.; Dutzer, M.; Boucau, J.; Eimer, M.; Boutin, D.; Revilla, J.L.; Golshan, M.; Smith, G.

    2015-01-01

    This document is made up of short articles whose issue is reactor dismantling. The first article presents the French strategy that can be featured by immediate dismantling (the dismantling process is prepared a long time before decommissioning and begins as soon as the reactor is shut down) and massive dismantling (a lot of nuclear facilities will be decommissioned in a near future). The following 4 articles give the viewpoints of ASN (Nuclear Safety Authority), EDF (for its fleet of PWRs), CEA (for its experimental reactors and nuclear facilities) and AREVA (for the EURODIF George Besse plant). Costs and financing are dealt with in an article that says that the cost is greatly dependent on the final state: a complete nuclear-free area or an area whose radioactivity is below safe standards and that law implies to constitute provisions all along the operating life of the facility to cover dismantling costs. Dismantling generates a huge amount of very low-level radioactive wastes particularly metal scraps that might be recycled and get out of nuclear industry, an article details the feasibility of such recycling. Another article shows the impact of massive dismantling on the management of radioactive wastes. In an article Westinghouse presents its experience in the cutting of internal equipment of the reactor core. The last 2 articles presents the dismantling strategies in Spain and in the UK. (A.C.)

  15. National School of Dismantling

    International Nuclear Information System (INIS)

    Ivaldi, Fabienne

    2003-01-01

    The National Institut of Nuclear Sciences and Techniques founded of 2001 a National School of Dismantling, NSD, at the end, which was validated by CEA, COGEMA, EDF and ANDRA. This school addresses four major issues: Decontamination; Dismantling; Demolition and waste Disposal (4D). Dedicated for instructing scientific and technical knowledge and know-how, needed in dismantling the nuclear installations, NSD has as targets: - personnel at engineering and operational level; - personnel occupied with involved trades from conception through intervention; - students and employees on leave; - employees while training on the job. Initial basic education for students in collaboration with schools and universities concerns: - master degree in radioactive waste management; - master degree in dismantling; - professional license in 3 D; - pro 4 D graduation. NSD is also engaged in continual formation for employees qualified, or not, adapted to the needs generated by the following tasks and personnel: - introduction in dismantling; - project team; - specialist engineer; - team head; - agent for remedial action; - agent for dismantling. The National School of Dismantling joins a network of human and technological capabilities confined within the 4 D frame, namely: - scientific and technical competencies (experts, instructors working in the nuclear field and dismantling); - pedagogical competence (professionals from basic and continual education); - specific material means such as those used by construction site schools, mock-ups, rooms for practical training etc

  16. The Superphenix dismantling

    International Nuclear Information System (INIS)

    Carle, R.

    1999-01-01

    This document presents selected abstracts of Remy Carle's presentation on the dismantling of Superphenix (october 1998). The author wonders about the consequences of such a decision. After a chronological account of this fast reactor project, its cost and the scientific and technical contribution, the dismantling problem is considered. For EDF (Electricite De France) the dismantling dimension is considered at the same time of the design. The main problem is the liquid sodium reprocessing: a technical but also a financing problem. The end of the speech deals with the political aspects of Superphenix and the relations with the public. (A.L.B.)

  17. Some regulation aspects in dismantling

    International Nuclear Information System (INIS)

    Niel, J.C.

    1993-01-01

    In the French regulation framework, operations linked to dismantling are controlled by an overall technical and legislative system applied to all the different stages of the facility (commissioning, etc.). Government control on facilities under dismantling is aimed at dismantling operation safety and security, and dismantling waste processing in order to ensure public and environmental protection

  18. UDIN's dismantling projects

    International Nuclear Information System (INIS)

    Laffaille, C.

    1993-01-01

    The role of UDIN (Central unit for nuclear facility decommissioning) at the CEA is reviewed together with the main specific aspects of nuclear dismantling: the different options and dismantling strategies and costs. The characteristics of the main on-going projects are described: graphite-gas reactors (G2/G3), RAPSODIE (RNR), AT1 (pilot RNR fuel reprocessing plant), ELAN II B (Cesium source conditioning plant), EL4 (heavy water/CO2 reactor), RM2 (fuel control radio-metallurgical laboratory) and UB-UM (Uranium enrichment plant)

  19. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  20. LEP dismantling starts

    CERN Multimedia

    2000-01-01

    Since the end of November, various teams have been getting stuck into dismantling the LEP accelerator and its four experiments. After making the installations safe, the dismantling and removal of 40,000 tonnes of equipment is underway. Down in the tunnel, it is a solemn moment. It is 10 o'clock on 13 December and Daniel Regin, one of those heading the dismantling work, moves in on a magnet, armed with a hydraulic machine. Surrounded by teams gathered there for a course in dismantling, he makes the first cut into LEP. The great deconstruction has begun. In little over than a year, the accelerator will have been cleared away to make room for its successor, the LHC. The start of the operation goes back to 27 November. Because before setting about the machine with hydraulic shears and monkey wrenches, LEP had first to be made safe - it was important to make sure the machine could be taken apart without risk. All the SPS beam injection systems to LEP were cut off. The fluids used for cooling the magnets and superc...

  1. Dismantling of Vandellos I

    International Nuclear Information System (INIS)

    Armada, J. R.

    2003-01-01

    Spain is witnessing the phase-out of a nuclear power plant. It is a unique experience in our country and therefore the dismantling work has been watched closely, not only from here but also from abroad. The Empresa Nacional de Residuos Radiactivos (ENRESA) is in charge of managing the dismantling and decommissioning work of the Vandellos-I nuclear power plant, located in the municipality of L'Hospitalet de l'Infant (Tarragona). the work began five years ago and has been executed on schedule. the appearance of what was one of the first Spanish commercial nuclear power plants has been changed radically to leave premises suitable for any other activity. (Author)

  2. Dismantling of nuclear facilities

    International Nuclear Information System (INIS)

    Tallec, Michele; Kus, Jean-Pierre; Mogavero, Robert; Genelot, Gabriel

    2009-01-01

    Although the operational life of nuclear plants is long (around 60 years for French reactors) it is nonetheless limited in time, the stopping of it being essentially due to the obsolescence of materials and processes or to economic or safety considerations. The nuclear power plants are then subjected to cleanup and dismantling operations which have different objectives and require specific techniques. The cleanup and/or dismantling of a nuclear power produces significant quantities of waste which is generally of a different nature to that produced during the operation of the concerned plant. The radioactive waste produced by these operations is destined to be sent to the waste disposal facilities of the French National Agency for the Management of Nuclear Waste. (authors)

  3. Method for dismantling shields

    International Nuclear Information System (INIS)

    Fukuzawa, Rokuro; Kondo, Nobuhiro; Kamiyama, Yoshinori; Kawasato, Ken; Hiraga, Tomoaki.

    1990-01-01

    The object of the present invention is to enable operators to dismantle shieldings contaminated by radioactivity easily and in a short period of time without danger of radiation exposure. A plurality of introduction pipes are embedded previously to the shielding walls of shielding members which contain a reactor core in a state where both ends of the introduction pipes are in communication with the outside. A wire saw is inserted into the introduction pipes to cut the shieldings upon dismantling. Then, shieldings can be dismantled easily in a short period of time with no radiation exposure to operator's. Further, according to the present invention, since the wire saw can be set easily and a large area can be cut at once, operation efficiency is improved. Further, since remote control is possible, cutting can be conducted in water and complicated places of the reactor. Biting upon starting the wire saw in the introduction pipe is reduced to facilitate startup for the rotation. (I.S.)

  4. Brennilis, laboratory of dismantlement

    International Nuclear Information System (INIS)

    Dupin, L.

    2011-01-01

    This article comments some aspects of the dismantlement activity on the Brennilis site (in Brittany) where a heavy water reactor has been operated from 1966 to 1985. Half of the deconstruction work has been performed between 1996 and 2006. As the model proposed by EDF for this operation raised some questions, works have been stopped for a while, until July 2011 when a decree authorized them again, but for some parts of the site only. The reactor block must wait as no technical solution exists for storage. But, the experience from this site will be used for eight other first generation power plants

  5. LEP Dismantling: Wagons Roll!

    CERN Multimedia

    2001-01-01

    The first trucks transporting material from LEP and its four experiments left CERN on 31 January. Since the LEP dismantling operation began, the material had been waiting to be removed from the sites of the four experiments and the special transit area on the Prévessin site. On the evening of 30 January, the French customs authorities gave the green light for the transport operation to begin. So first thing the next day, the two companies in charge of recycling the material, Jaeger & Bosshard (Switzerland) and Excoffier (France), set to work. Only 1500 truckloads to go before everything has been removed!

  6. Dismantling of transuranic contaminated facilities

    International Nuclear Information System (INIS)

    Roux, P.

    1985-01-01

    The dismantling of transuranic contaminated facilities raises specific problems. A large part of these problems relates to the management of the waste resulting from dismantling. From the experience gained in the different centers CEA and COGEMA it appears that there are industrial solutions in the group CEA and that an engineering company such as SGN can export them [fr

  7. Machine for dismantling metal parts

    Energy Technology Data Exchange (ETDEWEB)

    Prokopov, O.I.; Loginovskiy, V.I.; Yagudin, S.Z.

    1982-01-01

    The purpose of the invention is to reduce the outlays of time for dismantling metal parts under conditions of eliminating open gas and oil gushers in operational drilling. This goal is achieved because the machine for dismantling the metal parts is equipped with a set of clamping elements arranged on the chassis, where each of them has a drive.

  8. Nuclear installations: decommissioning and dismantling

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This document is a compilation of seven talks given during the 1995 EUROFORUM conference about decommissioning and dismantling of Nuclear installations in the European Community. The first two papers give a detailed description of the legal, financial and regulatory framework of decommissioning and dismantling of nuclear facilities in the European Union and a review of the currently available decommissioning techniques for inventory, disassembly, decontamination, remote operations and management of wastes. Other papers describe some legal and technical aspects of reactor and plants dismantling in UK, Germany, Spain and France. (J.S.)

  9. Capsule Endoscopy

    Science.gov (United States)

    ... because experience with it is limited and traditional upper endoscopy is widely available. Why it's done Your doctor might recommend a capsule endoscopy procedure to: Find the cause of gastrointestinal bleeding. If you have unexplained bleeding in your digestive ...

  10. Technical challenges for dismantlement verification

    International Nuclear Information System (INIS)

    Olinger, C.T.; Stanbro, W.D.; Johnston, R.G.; Nakhleh, C.W.; Dreicer, J.S.

    1997-01-01

    In preparation for future nuclear arms reduction treaties, including any potential successor treaties to START I and II, the authors have been examining possible methods for bilateral warhead dismantlement verification. Warhead dismantlement verification raises significant challenges in the political, legal, and technical arenas. This discussion will focus on the technical issues raised by warhead arms controls. Technical complications arise from several sources. These will be discussed under the headings of warhead authentication, chain-of-custody, dismantlement verification, non-nuclear component tracking, component monitoring, and irreversibility. The authors will discuss possible technical options to address these challenges as applied to a generic dismantlement and disposition process, in the process identifying limitations and vulnerabilities. They expect that these considerations will play a large role in any future arms reduction effort and, therefore, should be addressed in a timely fashion

  11. The promising opportunity of dismantlement

    International Nuclear Information System (INIS)

    Anon.

    2009-01-01

    Civil engineering, mechanics and waste conditioning companies are thriving around the market of nuclear facilities dismantlement which is promised to a huge development in the coming decade. This paper presents a map of the opportunities of the dismantlement market throughout Europe (research and power reactors, fuel fabrication plants, spent fuel reprocessing plants) and a cost estimation of a given dismantling work with respect to the different steps of the work. In France a small core of about twenty companies is involved in nuclear dismantlement but the French market is also looking towards foreign specialists of this activity. The British market is also targeted by the French companies but for all the actors the technological or commercial advance gained today will be determining for the future markets. (J.S.)

  12. Definition of a dismantling project

    International Nuclear Information System (INIS)

    Meyers, H.; Claes, J.; Geens, L.

    1988-01-01

    The shutdown of the fuel reprocessing plant of Eurochemic having been decided, a study for defining the facilities to be dismantled and how to do it, was conducted by Belgoprocess. The cost of the operation was estimated by an accurate investigation and by a pilot project on the dismantling of the wastes storage building. The work carried out up to now and the problems to be solved are summarized [fr

  13. BRET fuel assembly dismantling machine

    International Nuclear Information System (INIS)

    Titzler, P.A.; Bennett, K.L.; Kelley, R.S. Jr.; Stringer, J.L.

    1984-08-01

    An automated remote nuclear fuel assembly milling and dismantling machine has been designed, developed, and demonstrated at the Hanford Engineering Development Laboratory (HEDL) in Richland, Washington. The machine can be used to dismantle irradiated breeder fuel assemblies from the Fast Flux Test Facility prior to fuel reprocessing. It can be installed in an existing remotely operated shielded hot cell facility, the Fuels and Materials Examination Facility (FMEF), at the Hanford Site in Richland, Washington

  14. The good wealth of dismantlement

    International Nuclear Information System (INIS)

    Maincent, G.

    2009-01-01

    Civil engineering, mechanical and waste conditioning companies are working hard on the market of nuclear facilities dismantling. This market has a great future ahead of it in the ten years to come. According to the European Commission, 50 to 60 reactors among the 157 actually in service in the European Union should be dismantled by 2025. The cost per reactor is estimated to 10-15% of the initial investment, which represents an enormous amount of money, estimated to 20-39 billion euros for the only French nuclear park. In France, this market is shared by a core of about 20 companies, like Spie Nucleaire, Onet, Vinci (Nuvia) and Areva. Some dismantling sites require a specific skill, in particular those in relation with the research activity of the CEA (the French atomic energy commission) or involving specific technologies (research reactors, spent fuel reprocessing plants, sodium-cooled rectors..). (J.S.)

  15. Decontamination of the HFR dismantling cell

    International Nuclear Information System (INIS)

    Cloes, K.; Husmann, K.; Hardt, P. von der.

    1976-05-01

    The Commission of the European Communities operates in the Petten Establishment of the Joint Research Centre (EURATOM), a 45 MW light-water cooled materials testing reactor, the HFR. Inside the reactor containment building, on top of a side wing of the main pool, a hot cell had been constructed for the dismantling, of irradiated equipment, and brought into active service in July 1966. Early in 1973, the cell was contaminated by 0.1 to 1 Ci of Po 210 , originating from an irradiation capsule containing Bi impregnated graphite specimens. Due to the elevated radiotoxicity of this isotope, and to numerous potential ways of spreading out the contamination it was decided to stop routine operation of the cell until a satisfactory degree of decontamination had been reached. Two years have been spent for preparation of specialized equipment and thorough clean-up and overhaul work of the cell. It went back into normal operation on February 21st, 1975 and has since then been working very successfully

  16. The timing of reactor dismantling

    International Nuclear Information System (INIS)

    Roberts, P.

    2000-01-01

    Work has been progressing across the world for the decommissioning of nuclear reactors. The initial work focused on the early, complete dismantling but this was associated with small size reactors and was done for experimental or demonstration purposes. The situation now is that an increasing number of full size power reactors are being shutdown and decision are being made as to the decommissioning strategy to be applied, e.g. with respect to the appropriate timing of reactor dismantling. There are two basic approaches to the timing of reactor dismantling, which are to either proceed with dismantling on an early time scale or to delay it for a period of years. There are a number of examples worldwide of both approaches being taken but one common feature of the approach taken by most countries is that decisions are made on a case by case basis, taking account of relevant factors, and as a result the strategy can vary from reactor to reactor and from country to country. Decisions on timing take account of the following main factors: safety, radioactive decay, financial factors, radioactive waste, reactor type, technology, repository availability, site re-use, regulatory standards, plant knowledge/records, other issues

  17. Dismantling system of concrete thermal shielding walls

    International Nuclear Information System (INIS)

    Machida, Nobuhiro; Saiki, Yoshikuni; Ono, Yorimasa; Tokioka, Masatake; Ogino, Nobuyuki.

    1985-01-01

    Purpose: To enable safety and efficient dismantling of concrete thermal shielding walls in nuclear reactors. Method: Concrete thermal shielding walls are cut and dismantled into dismantled blocks by a plasma cutting tool while sealing the top opening of bioshielding structures. The dismantled blocks are gripped and conveyed. The cutting tool is remote-handled while monitoring on a television receiver. Slugs and dusts produced by cutting are removed to recover. Since the dismantling work is carried out while sealing the working circumstance and by the remote control of the cutting tool, the operators' safety can be secured. Further, since the thermal sealing walls are cut and dismantled into blocks, dismantling work can be done efficiently. (Moriyama, K.)

  18. Evaluation of decontamination during dismantling of plutonium-contaminated glove boxes

    International Nuclear Information System (INIS)

    Kinugasa, Manabu; Taguchi, Seigi; Ohzeki, Satoru; Inoue, Yoshiaki; Kashima, Sadamitsu

    1981-01-01

    The dismantling work of plutonium-contaminated glove boxes was carried out. These glove boxes had been used for the R and D of plutonium-uranium mixed oxide fuel for 15 years. The work was carried out in a pressure-controlled greenhouse, and the contamination of air in the greenhouse was monitored continuously. In order to reduce the contamination of air during dismantling, the decontamination and fixation of loose contaminants on the surfaces of glove boxes were very important. The correlation between decontamination and the contamination of air regarding dismantling is reported in this paper. The surface contamination density of the glove boxes was measured utilizing the smear method before and after the decontamination, and the decontamination effects were estimated. The contamination of air during dismantling was continuously measured with a plutonium dust monitor. It was found that loose contamination exponentially decreased by the decontamination process. When the so-called wet glove boxes, which contained wet recovery and waste disposal apparatus, were dismantled, the contamination of air did not exceed 500 (MPC) a. However, the contamination of air exceeded 500 (MPC) a several times in the present work of dismantling the so-called dry glove boxes which had been used for the fabrication of plutonium-uranium mixed oxide pellets. (Kato, T.)

  19. The Pierrelatte's military factories dismantling

    International Nuclear Information System (INIS)

    Bourrelier, P.; Kassel, Ch.

    1999-01-01

    The site of Pierrelatte in France, receives since 1958 gaseous diffusion plants assigned to the uranium enrichment for military uses. Since 1996 Cogema implements, by order of the Cea, a dismantling operation of the site. The operation which will begin in 2000, is going to last ten years. This project shows difficulties that make it innovative. Its originality, the planning, the risks, the program progressing and the regulation aspects are detailed in this paper. Beyond the complicated technical operations, the wastes management is of primary importance for the good development of the operations. (A.L.B.)

  20. Experience in the decontamination and dismantling of alpha facilities

    International Nuclear Information System (INIS)

    Charamathieu, A.

    1988-01-01

    Experience in dismantling alpha-containing radiochemical installations in France is described. The dismantling programme undertaken by the Societe des Techniques en Milieu Ionisant since 1977 is tabulated. This includes the dismantling of CALCIO and FLUO (plutonium metal), the dismantling of a slag processing plant, the dismantling of part of a medium activity plutonium mine and the dismantling of rooms 82-100 at Marcoule, France. (author)

  1. EL-3 dismantling of an experimental reactor

    International Nuclear Information System (INIS)

    1989-01-01

    The EL3 experimental reactor has been definitively stopped in march 1979. Its decommissioning has been pronounced in the end of 1982. This article is consecrated at decontamination and dismantling works necessited by its passage at the dismantling level 2 [fr

  2. Decontamination and dismantling at the CEA

    International Nuclear Information System (INIS)

    2006-01-01

    This document presents the dismantling policy at the CEA (French Research Center on the atomic energy), the financing of the decontamination and the dismantling, the regulatory framework, the knowledge and the technology developed at the CEA, the radiation protection, the environment monitoring and the installations. (A.L.B.)

  3. Hot cell examination on the surveillance capsule and HANARO capsule in IMEF

    International Nuclear Information System (INIS)

    Choo, Yong Sun; Oh, Wan Ho; Yoo, Byung Ok; Jung, Yang Hong; Ahn, Sang Bok; Baik, Seung Je; Song, Wung Sup; Hong, Kwon Pyo

    2000-01-01

    For the maintenance of integrity and safety of pressurizer of commercial power plant until its life span, it is required by US NRC 10CFR50 APP. G and H and ASTM E185-94 to periodically monitor irradiation embrittlement by neutron irradiation. In order to accomplished the requirement reactor operator has been carrying out the test by extracting the monitoring capsule embeded in reactor during the period of planned preventive maintenance. In relation to this irradiation samples are being used for prediction of reactor vessel life span and reactor vessel's adjusted reference temperature by irradiation of neutron flux enough to reach to end of life span. And also irradiation capsules with and without instrumentation are used for R and D on nuclear materials. Each capsule contains high radioactivity, therefore, post irradiation examination has to be handled by all means in the hot cell. The facility available for this purpose is Irradiated material examination facility (IMEF) to handle such works as capsule receiving, capsule cut and dismantling, sample classification, various examination, and finally development and improvement of examination equipment and instrumentation. (Hong, J. S.)

  4. Laser dismantling of a glovebox

    International Nuclear Information System (INIS)

    Johnson, R.; Fender, M.

    1985-01-01

    A 5 kW laser has been used to cut up a 2.6 x 1 x 1 m glove box made of 5 mm mild steel with 12.5 mm perspex windows and 3 mm neoprene gaskets. The laser cut all components including the sandwich of perspex, neoprene and steel with ease. The production of fibrous filaments of perspex during the cutting process has been almost avoided by modifying the cutting variables. The combustion of material beyond that being cut has also been prevented by adopting the correct level of laser power. The problems encountered with loss of glove box rigidity with progressive dismantling are discussed, together with the relevance these problems have to possible cutting methods other than lasers. (author)

  5. Thermal characteristic test for saturated temperature type capsule

    International Nuclear Information System (INIS)

    Niimi, Motoji; Someya, Hiroyuki; Kobayashi, Toshiki; Ohuchi, Mitsuo; Harayama, Yasuo

    1989-08-01

    The Japan Material Testing Reactor Project is developing a new type capsule so-called 'Saturated Temperature Capsule', as a part of irradiation technique improvement program. This type capsule, in which the water is supplied and boiled, bases on the conception of keeping the coolant at the saturated temperature and facilitating the temperature setting of specimens heated by gamma-ray in reactor. However, out-pile test was planned, because there were few usable data for design and operation of the capsule into which the coolant was injected. A out-pile apparatus, simulated the capsule with electric heaters, was fabricated and experiments were carried out, to obtain data concerning design and operation for the capsule into which the water was injected. As a structure of simulated capsule, a type of downward coolant supply was adopted. The downward coolant tube type injectes the water in the bottom of capsule by tube through the upper flange. Major objects of experiences were to grasp thermal features under operation and to provide performances of capsule control equipment. Experimental results proved that the temperature of water within the capsule was easily varied by controlling supply water flow rate, and that the control equipment was operated stably and safety. (author)

  6. The Japan Power Demonstration Reactor (JPDR) dismantling activities. Management of JPDR dismantling waste

    International Nuclear Information System (INIS)

    Abe, Masayoshi; Nakata, Susumu; Ito, Shinichi

    1996-01-01

    The management of wastes, both radioactive and non-radioactive, is one of the most important issues for a safe and reasonable dismantling operation of nuclear power plants. A large amount of radioactive wastes is arising from a reactor dismantling operation in a relatively short period time, ranging in a wide variety from very low level to relatively high level. Moreover non-radioactive waste is also in a huge amount. The dismantling operation of Japan Power Demonstration Reactor (JPDR) resulted in 24,440 tons of dismantling wastes, of which about 15% was radioactive and 85% non-radioactive. These wastes were managed successfully implementing a well developed management plan for JPDR dismantling waste. Research and development works for handling of JPDR dismantling wastes were performed, including fixation of loose contamination on surface, volume reduction and waste containers for on-site transportation and interim storage. The JPDR dismantling wastes generated were classified and categorized depending on their materials, characteristics and activity level. Approximately 2,100 tons of radioactive wastes were stored in the interim storage facilities on site using developed containers, and 1,670 tons of radioactive concrete waste were used for a safe demonstration test of a simple near-surface disposal for very low level waste. Other dismantling wastes such as steel and concrete which were categorized as non-radioactive were recycled and reused as useful resources. This paper describes the management of the JPDR dismantling wastes. (author)

  7. Consideration of dismantling operations in the design

    International Nuclear Information System (INIS)

    Dubourg; Bonin.

    1984-12-01

    This analysis shows that the parameters and the constraints taken into account at the design level to facilitate the exploitation and the maintenance make the dismantling and its preparation easier [fr

  8. Dismantling institutional racism: theory and action.

    Science.gov (United States)

    Griffith, Derek M; Mason, Mondi; Yonas, Michael; Eng, Eugenia; Jeffries, Vanessa; Plihcik, Suzanne; Parks, Barton

    2007-06-01

    Despite a strong commitment to promoting social change and liberation, there are few community psychology models for creating systems change to address oppression. Given how embedded racism is in institutions such as healthcare, a significant shift in the system's policies, practices, and procedures is required to address institutional racism and create organizational and institutional change. This paper describes a systemic intervention to address racial inequities in healthcare quality called dismantling racism. The dismantling racism approach assumes healthcare disparities are the result of the intersection of a complex system (healthcare) and a complex problem (racism). Thus, dismantling racism is a systemic and systematic intervention designed to illuminate where and how to intervene in a given healthcare system to address proximal and distal factors associated with healthcare disparities. This paper describes the theory behind dismantling racism, the elements of the intervention strategy, and the strengths and limitations of this systems change approach.

  9. Weapons dismantlement issues in independent Ukraine

    International Nuclear Information System (INIS)

    Zack, N.R.

    1995-01-01

    The American Association for the Advancement of Science sponsored a seminar during September 1993 in Kiev, Ukraine, titled, ''Toward a Nuclear-Free Future--Barriers and Problems.'' It brought together Ukrainians, Belarusians and Americans to discuss the legal, political, economic, technical, and safeguards and security dimensions of nuclear weapons dismantlement and destruction. US representatives initiated discussions on legal and treaty requirements and constraints, safeguards and security issues surrounding dismantlement, storage and disposition of nuclear materials, warhead transportation, and economic considerations. Ukrainians gave presentations on arguments for and against the Ukraine keeping nuclear weapons, the Ukrainian Parliament's nonapproval of START 1, alternative strategies for dismantling silos and launchers, and economic and security implications of nuclear weapons removal from the Ukraine. Participants from Belarus discussed proliferation and control regime issues. This paper will highlight and detail the issues, concerns and possible impacts of the Ukraine's dismantlement of its nuclear weapons

  10. General Research and Development problems in dismantling

    International Nuclear Information System (INIS)

    Lorin, C.

    1993-01-01

    R and D studies for dismantling nuclear facilities have been conducted in several domains: safety evaluation (3D cameras, gamma camera, gamma low level control bench, alpha measures); general studies (such as the Baladin software, an expert system for dismantling); decontamination techniques (utilisation of acid or base liquids, laser, ...); cutting techniques and tools (remote controlled grinder, remote controlled robot, carrier crane); robotics for remote operations and handling; waste processing

  11. The installation and dismantling of electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to construction of aluminium electrolytic cells, their installation and dismantling. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  12. The dismantling of CEA nuclear installations

    International Nuclear Information System (INIS)

    Piketty, Laurence

    2016-03-01

    After having indicated locations of French nuclear installations which are currently being dismantled (about 30 installations), and recalled the different categories of radioactive wastes with respect to their activity level and the associated storage options, this article gives an overview of various aspects of dismantling, more precisely in the case of installations owned and managed by the CEA. These operations comprise the dismantling itself, the recovery and packaging of wastes, old effluents and spent fuels. The organisation and responsible departments within the CEA are presented, and the author outlines some operational problematic issues met due to the age of installations (traceability of activities, regulation evolutions). The issue of financing is then discussed, and its uncertainties are outlined. The dismantling strategy within the CEA-DEN is described, with reference to legal and regulatory frameworks. The next parts of the article address the organisation and the economic impact of these decontamination and dismantling activities within the CEA-DEN, highlight how R and D and advanced technology are a support to this activities as R and D actions address all scientific and technical fields of nuclear decontamination and dismantling. An overview of three important dismantling works is proposed: Fontenay-aux-Roses, the Marcoule CEA centre (a reference centre in the field of nuclear dismantling and decontamination) and the Grenoble CEA centre (reconversion in R and D activities in the fields of technologies of information, of communication, technologies, for health, and in renewable energies). The last part addresses the participation to the Strategic Committee of the Nuclear Sector (CSFN)

  13. Hot cell examination on the surveillance capsule of SA 533 cl. 1 reactor pressure vessel (1st test report)

    Energy Technology Data Exchange (ETDEWEB)

    Choo, Yong Sun; Jung, Y. H.; Yoo, B. O.; Baik, S. J.; Oh, W. H.; Soong, W. S.; Hong, K. P

    2000-08-01

    The post-irradiated examinations such as impact test, tensile test, composition analysis and etc. were conducted to monitor and to evaluate the radiation-induced changes, so called radiation embrittlement, in the mechanical properties of ferritic materials. Those data should be applied to confirm safety as well as reliability of reactor pressure vessel. The scopes and contents of hot cell examination on the surveillance capsule are as follows; - Capsule transportation, cutting, dismantling and classification - Shim block and Dosimeter cutting and dismantling - Impact test - Tensile test - Composition analysis by EPMA - SEM observation on the fractured surface - Hardness test - Radwaste treatment.

  14. Dismantling of Radium-226 Coal Level Gauges: Encountered Problems and How to Solve

    International Nuclear Information System (INIS)

    Punnachaiya, M.; Nuanjan, P.; Moombansao, K.; Sawangsri, T.; Pruantonsai, P.; Srichom, K.

    2006-01-01

    This paper describes the techniques for dismantling of disused-sealed Radium-226 (Ra-226) coal level gauges which the source specifications and documents were not available, including problems occurred during dismantling stage and the decision making in solving all those obstacles. The 2 mCi (20 pieces), 6 mCi (20 pieces) and 6.6 mCi (30 pieces) of Ra-226 hemi-spherically-shaped with lead-filled coal level gauges were used in industrial applications for electric power generation. All sources needed to be dismantled for further conditioning as requested by the International Atomic Energy Agency (IAEA). One of the 2 mCi Ra-226 source was dismantled under the supervision of IAEA expert. Before conditioning period, each of the 6 mCi and 6.6 mCi sources were dismantled and inspected. It was found that coal level gauges had two different source types: the sealed cylindrical source (diameter 2 cm x 2 cm length) locked with spring in lead housing for 2 mCi and 6.6 mCi; while the 6 mCi was an embedded capsule inside source holder stud assembly in lead-filled housing. Dismantling Ra-226 coal level gauges comprised of 6 operational steps: confirmation of the surface dose rate on each source activity, calculation of working time within the effective occupational dose limit, cutting the weld of lead container by electrical blade, confirmation of the Ra-226 embedded capsule size using radiation scanning technique and gamma radiography, automatic sawing of the source holder stud assembly, and transferring the source to store in lead safe box. The embedded length of 6 mCi Ra-226 capsule in its diameter 2 cm x 14.7 cm length stud assembly was identified, the results from scanning technique and radiographic film revealed the embedded source length of about 2 cm, therefore all the 6 mCi sources were safely cut at 3 cm using the automatic saw. Another occurring problem was one of the 6.6 mCi spring type source stuck inside its housing because the spring was deformed and there was

  15. Study on treatment of dust by dismantling

    International Nuclear Information System (INIS)

    Torikai, K.; Suzuki, K.

    1987-01-01

    In dismantling of nuclear reactors, various kinds of treatment of dust generated by cutting or dismantling concrete structures of components of reactors are evaluated for safety, cost, and performance comparing the work in air with water. A method of dust treatment for work in air is discussed. The dry method has an easy operation in practice and a good performance in the equipment, but has problem on the prevention from radioactive contamination by diffusion of dust in air. For the purpose of advancing the strong points and eliminating the weak points in dry method, an improved venturi scrubber system is proposed for dismantling work as a dust collecting system. The system consists of dust absorbing pipe, dust collector, separator of dust and water and dust transfer equipment to a storage of waste. This system would be expected to have better performance and lower operating cost in decommissioning nuclear reactors, especially, the number of dust filters, for example, HEPA filters, will be considerably saved

  16. Vandellos-I Dismantling nearing completion

    International Nuclear Information System (INIS)

    Armada, J. R.

    2004-01-01

    Spain is witnessing the phase-out of a nuclear power plant. It is a unique experience in our country and therefore the dismantling work has been watched closely, not only from here but also from abroad. The Empresa Nacional de Residuos Radiactivos (ENRESA) is in charge of managring the dismantling and decommissioning work of the Vandellos-1 nuclear power plant, located in the municipally of l' Hospitalet de l'Infant (Tarragona). The work began five years ago and has been executed on schedule. The appearance of what was one of the first Spanish commercial nuclear power plants has been changed radically to leave premises suitable for any other activity. (Author)

  17. Economical dismantling of nuclear power stations

    International Nuclear Information System (INIS)

    Mallok, J.; Andermann, H.

    1999-01-01

    The dismantling of nuclear power stations requires a high degree of security and economic efficiency due to the strong contamination of components and the close spatial conditions. In order to protect involved staff from radiation, modern remote-controlled technology is applied in sectors with heavy radioactive contamination such as reactor pressure vessels. The article shows, that the dismantling of reactor pressure vessels using a remote-controlled milling machine developed by the Siemens subsidiary Mechanik Center Erlangen GmbH, can be done in a secure and efficient way. (orig.) [de

  18. Posterior capsule opacification.

    Science.gov (United States)

    Wormstone, I Michael; Wang, Lixin; Liu, Christopher S C

    2009-02-01

    Posterior Capsule Opacification (PCO) is the most common complication of cataract surgery. At present the only means of treating cataract is by surgical intervention, and this initially restores high visual quality. Unfortunately, PCO develops in a significant proportion of patients to such an extent that a secondary loss of vision occurs. A modern cataract operation generates a capsular bag, which comprises a proportion of the anterior and the entire posterior capsule. The bag remains in situ, partitions the aqueous and vitreous humours, and in the majority of cases, houses an intraocular lens. The production of a capsular bag following surgery permits a free passage of light along the visual axis through the transparent intraocular lens and thin acellular posterior capsule. However, on the remaining anterior capsule, lens epithelial cells stubbornly reside despite enduring the rigours of surgical trauma. This resilient group of cells then begin to re-colonise the denuded regions of the anterior capsule, encroach onto the intraocular lens surface, occupy regions of the outer anterior capsule and most importantly of all begin to colonise the previously cell-free posterior capsule. Cells continue to divide, begin to cover the posterior capsule and can ultimately encroach on the visual axis resulting in changes to the matrix and cell organization that can give rise to light scatter. This review will describe the biological mechanisms driving PCO progression and discuss the influence of IOL design, surgical techniques and putative drug therapies in regulating the rate and severity of PCO.

  19. Polydopamine-coated capsules

    Science.gov (United States)

    White, Scott R.; Sottos, Nancy R.; Kang, Sen; Baginska, Marta B.

    2018-04-17

    One aspect of the invention is a polymer material comprising a capsule coated with PDA. In certain embodiments, the capsule encapsulates a functional agent. The encapsulated functional agent may be an indicating agent, healing agent, protecting agent, pharmaceutical drug, food additive, or a combination thereof.

  20. Temperature buffer test. Dismantling operation

    Energy Technology Data Exchange (ETDEWEB)

    Aakesson, Mattias [Clay Technology AB, Lund (Sweden)

    2010-12-15

    The Temperature Buffer Test (TBT) is a joint project between SKB/ANDRA and supported by ENRESA (modelling) and DBE (instrumentation), which aims at improving the understanding and to model the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test has been carried out in a KBS-3 deposition hole at Aespoe HRL. It was installed during the spring of 2003. Two heaters (3 m long, 0.6 m diameter) and two buffer arrangements have been investigated: the lower heater was surrounded by bentonite in the usual way, whereas the upper heater was surrounded by a ring of sand. The test was dismantled and sampled during a period from the end of October 2009 to the end of April 2010, and this report describes this operation. Different types of samples have been obtained during this operation. A large number of diameter 50 mm bentonite cores have been taken for analysis of water content and density. Large pieces, so-called big sectors, have been taken for hydro-mechanical and chemical characterizations. Finally, there has been an interest to obtain different types of interface samples in which bentonite were in contact with sand, iron or concrete. One goal has been to investigate the retrievability of the upper heater, given the possibility to remove the surrounding sand shield, and a retrieval test has therefore been performed. The sand in the shield was first removed with an industrial vacuum cleaner after loosening the material through mechanical means (with hammer drill and core machine). A front loader was subsequently used for applying a sufficient lifting force to release the heater from the bentonite underneath. The experiment has been documented in different aspects: measurements of the coordinate (height or radius) of different interfaces (between bentonite blocks and between bentonite and sand); verification of sensor positions and retrieval of sensors for subsequent

  1. Temperature buffer test. Dismantling operation

    International Nuclear Information System (INIS)

    Aakesson, Mattias

    2010-12-01

    The Temperature Buffer Test (TBT) is a joint project between SKB/ANDRA and supported by ENRESA (modelling) and DBE (instrumentation), which aims at improving the understanding and to model the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test has been carried out in a KBS-3 deposition hole at Aespoe HRL. It was installed during the spring of 2003. Two heaters (3 m long, 0.6 m diameter) and two buffer arrangements have been investigated: the lower heater was surrounded by bentonite in the usual way, whereas the upper heater was surrounded by a ring of sand. The test was dismantled and sampled during a period from the end of October 2009 to the end of April 2010, and this report describes this operation. Different types of samples have been obtained during this operation. A large number of diameter 50 mm bentonite cores have been taken for analysis of water content and density. Large pieces, so-called big sectors, have been taken for hydro-mechanical and chemical characterizations. Finally, there has been an interest to obtain different types of interface samples in which bentonite were in contact with sand, iron or concrete. One goal has been to investigate the retrievability of the upper heater, given the possibility to remove the surrounding sand shield, and a retrieval test has therefore been performed. The sand in the shield was first removed with an industrial vacuum cleaner after loosening the material through mechanical means (with hammer drill and core machine). A front loader was subsequently used for applying a sufficient lifting force to release the heater from the bentonite underneath. The experiment has been documented in different aspects: measurements of the coordinate (height or radius) of different interfaces (between bentonite blocks and between bentonite and sand); verification of sensor positions and retrieval of sensors for subsequent

  2. The WAK decommissioning and dismantling program

    International Nuclear Information System (INIS)

    Eiben, K.; Fritz, P.

    1995-01-01

    After an extensive rinsing of the reprocessing equipment the operation in the plant was terminated in 1991 following the principal political decision to abolish reprocessing of nuclear fuel in Germany. Since July 1991 only the safety relevant units are still in operation including the waste storage facilities for 80 m 3 of high active waste concentrate (HAWC). The decommissioning and dismantling will be achieved in six steps taking into account that some of the reprocessing equipment can be dismantled before and the rest only after the HAWC has been vitrified approximately by mid 2000. So far two licenses for decommissioning have been granted. An application for the dismantling of twelve systems in the process building including headend and tailend facilities will be licensed in 1995. The remote dismantling of equipment from the hot cells in the process building is being planned and will be executed between 1998--2001. New remote handling equipment will be cold tested in a test facility scheduled to start in the middle of this year. The final task is the green meadow after demolishing of the building and remediation of the site which is scheduled for 2005

  3. Method of dismantling nuclear fuel elements

    International Nuclear Information System (INIS)

    Adams, G.J.

    1983-01-01

    Nuclear fuel assemblies of the kind comprising fuel pins in dimpled cellular grids are freed from the grids to aid dismantling of the assemblies by causing a rotary sleeve to pass concentrically over the pins to remove the dimples in the grids and thereby increase the freedom of the pins in the cells of the grids. (author)

  4. Cleansing and dismantling of CEA-Saclay nuclear licensed facilities

    International Nuclear Information System (INIS)

    Jeanjacques, Michel; Delaire, Isabelle; Glevarec, Rebecca; Mandard, Lionel; Martin, Jean-Louis; Serrano, Roger

    2013-01-01

    This summary presents the cleansing and dismantling operations currently realized on the CEA center of Saclay (CEA-Saclay). It was initiated at the beginning of the 2000 years a cleansing and dismantling program of the old Nuclear Licensed Facilities (NLF). Currently this program relates the dismantling operations to the Hot Laboratories (Laboratoires de Haute Activite: LHA) and the old workshops of the Liquid Waste Treatment Plant (Station des Effluents Liquides: STEL), the dismantling preparation of Ulysse reactor and the dismantling studies to the Solid Waste Management Plant (SWMP; Zone de Gestion des Dechets Solides) and the Osiris reactor. (authors)

  5. In-situ dismantling of plutonium-contaminated glove box

    International Nuclear Information System (INIS)

    Numata, Koji; Watanabe, Hisashi; Ishikawa, Hisashi; Miyo, Hiroaki; Ohtsuka, Katsuyuki

    1980-01-01

    A plutonium-contaminated glove box was dismantled along with the development of the treatment techniques for plutonium-bearing wastes. The objectives of this in-situ dismantling of the glove box are to reuse the Plutonium Fuel Fabrication Facility more efficiently, to reduce the volume of wastes generated during the dismantling, and to acquire dismantling techniques for decommissioning the Plutonium Fuel Fabrication Facility in the future. Prior to the dismantling works, a greenhouse for decontamination was installed, and the decontamination with surfactants was performed. Unremovable contamination was coated with paint. After this greenhouse was removed, the main greenhouse for dismantling and three greenhouses for contamination control were assembled. The main workers wearing protective devices engaged in dismantling works in the greenhouse. As the protective devices, anorak type PVC suits with air line masks, Howell type pressurized suits, and respirators were used. The tools used for the dismantling are a plasma cutter, an electric nibbler, an electric disk grinder, an electric circular saw and an electric jig saw. The results of the dismantling in-situ were compared with two previous cases of dismantling carried out by different procedures. In the case of in-situ dismantling, the volume of wastes was 1.6 - 1.8 m 3 /m 3 of glove box, and considerable reduction was realized. (Kako, I.)

  6. Magnetically guided capsule endoscopy.

    Science.gov (United States)

    Shamsudhin, Naveen; Zverev, Vladimir I; Keller, Henrik; Pane, Salvador; Egolf, Peter W; Nelson, Bradley J; Tishin, Alexander M

    2017-08-01

    Wireless capsule endoscopy (WCE) is a powerful tool for medical screening and diagnosis, where a small capsule is swallowed and moved by means of natural peristalsis and gravity through the human gastrointestinal (GI) tract. The camera-integrated capsule allows for visualization of the small intestine, a region which was previously inaccessible to classical flexible endoscopy. As a diagnostic tool, it allows to localize the sources of bleedings in the middle part of the gastrointestinal tract and to identify diseases, such as inflammatory bowel disease (Crohn's disease), polyposis syndrome, and tumors. The screening and diagnostic efficacy of the WCE, especially in the stomach region, is hampered by a variety of technical challenges like the lack of active capsular position and orientation control. Therapeutic functionality is absent in most commercial capsules, due to constraints in capsular volume and energy storage. The possibility of using body-exogenous magnetic fields to guide, orient, power, and operate the capsule and its mechanisms has led to increasing research in Magnetically Guided Capsule Endoscopy (MGCE). This work shortly reviews the history and state-of-art in WCE technology. It highlights the magnetic technologies for advancing diagnostic and therapeutic functionalities of WCE. Not restricting itself to the GI tract, the review further investigates the technological developments in magnetically guided microrobots that can navigate through the various air- and fluid-filled lumina and cavities in the body for minimally invasive medicine. © 2017 American Association of Physicists in Medicine.

  7. Decommissioning and dismantling reactors and managing waste

    International Nuclear Information System (INIS)

    Bensoussan, E.; Reicher-Fournel, N.

    2005-01-01

    In the early forties/fifties, a number of countries launched the first developments in the field of nuclear power. Some of them now have large numbers of nuclear facilities and nuclear power plants which have met, and continue to meet, the objectives for which they were designed and built. Other plants, including nuclear fuel production and enrichment plants, experimental reactors or research reactors, will have to be dismantled and demolished in the near future. These activities are handled differently in different countries as a function of specific energy policies, advanced development plants, current financial resources, the availability of qualified engineers and specialized industries able to handle projects of this kind, as well as other factors. All dismantling and demolition projects serve the purpose of returning the respective sites to green-field conditions. (orig.)

  8. Advanced robotics for decontamination and dismantlement

    International Nuclear Information System (INIS)

    Hamel, W.R.; Haley, D.C.

    1994-01-01

    The decontamination and dismantlement (D ampersand D) robotics technology application area of the US Department of Energy's Robotics Technology Development Program is explained and described. D ampersand D robotic systems show real promise for the reduction of human exposure to hazards, for improvement of productivity, and for the reduction of secondary waste generation. Current research and development pertaining to automated floor characterization, robotic equipment removal, and special inspection is summarized. Future research directions for these and emerging activities is given

  9. SGDES: Management system dismantling of ENRESA

    International Nuclear Information System (INIS)

    Julian, A. de; Fernandez, M.; Vidaechea, S.

    2013-01-01

    ENRESA, the Spanish public company responsible for managing radioactive waste and nuclear facilities decommissioning, has developed a management information system (SGDES) for the decommissioning of nuclear power plants. Dismantling activities require a rigorous operations control within highly specialized, process systematization and safety framework, both under human and technological point of view. SGDES system is capable of responding to the mentioned operational needs, efficiently and safely.

  10. Nuclear safety training program (NSTP) for dismantling

    International Nuclear Information System (INIS)

    Cretskens, Pieter; Lenie, Koen; Mulier, Guido

    2014-01-01

    European Control Services (GDF Suez) has developed and is still developing specific training programs for the dismantling and decontamination of nuclear installations. The main topic in these programs is nuclear safety culture. We therefore do not focus on technical training but on developing the right human behavior to work in a 'safety culture' environment. The vision and techniques behind these programs have already been tested in different environments: for example the dismantling of the BN MOX Plant in Dessel (Belgium), Nuclear Safety Culture Training for Electrabel NPP Doel..., but also in the non-nuclear industry. The expertise to do so was found in combining the know-how of the Training and the Nuclear Department of ECS. In training, ECS is one of the main providers of education in risky tasks, like elevation and manipulation of charges, working in confined spaces... but it does also develop training on demand to improve safety in a certain topic. Radiation Protection is the core business in the Nuclear Department with a presence on most of the nuclear sites in Belgium. Combining these two domains in a nuclear safety training program, NSTP, is an important stage in a dismantling project due to specific contamination, technical and other risks. It increases the level of safety and leads to a harmonization of different working cultures. The modular training program makes it possible to evaluate constantly as well as in group or individually. (authors)

  11. LEP Dismantling Reaches Half-Way Stage

    CERN Multimedia

    2001-01-01

    LEP's last superconducting module leaves its home port... Just seven months into the operation, LEP dismantling is forging ahead. Two of the eight arcs which form the tunnel have already been emptied and the last of the accelerator's radiofrequency (RF) cavities has just been raised to the surface. The 160 people working on LEP dismantling have reason to feel pleased with their progress. All of the accelerator's 72 superconducting RF modules have already been brought to the surface, with the last one being extracted on 2nd May. This represents an important step in the dismantling process, as head of the project, John Poole, explains. 'This was the most delicate part of the project, because the modules are very big and they could only come out at one place', he says. The shaft at point 1.8 through which the RF cavity modules pass is 18 metres in diameter, while each module is 11.5 metres long. Some modules had to travel more than 10 kilometres to reach the shaft. ... is lifted up the PM 1.8 shaft, after a m...

  12. Remote tool development for nuclear dismantling operations

    International Nuclear Information System (INIS)

    Craig, G.; Ferlay, J.C.; Ieracitano, F.

    2003-01-01

    Remote tool systems to undertake nuclear dismantling operations require careful design and development not only to perform their given duty but to perform it safely within the constraints imposed by harsh environmental conditions. Framatome ANP NUCLEAR SERVICES has for a long time developed and qualified equipment to undertake specific maintenance operations of nuclear reactors. The tool development methodology from this activity has since been adapted to resolve some very challenging reactor dismantling operations which are demonstrated in this paper. Each nuclear decommissioning project is a unique case, technical characterisation data is generally incomplete. The development of the dismantling methodology and associated equipment is by and large an iterative process combining design and simulation with feasibility and validation testing. The first stage of the development process involves feasibility testing of industrial tools and examining adaptations necessary to control and deploy the tool remotely with respect to the chosen methodology and environmental constraints. This results in a prototype tool and deployment system to validate the basic process. The second stage involves detailed design which integrates any remaining technical and environmental constraints. At the end of this stage, tools and deployment systems, operators and operating procedures are qualified on full scale mock ups. (authors)

  13. Training apparatus

    International Nuclear Information System (INIS)

    Monteith, W.D.

    1983-01-01

    Training apparatus for use in contamination surveillance uses a mathematical model of a hypothetical contamination source (e.g. nuclear, bacteriological or chemical explosion or leak) to determine from input data defining the contamination source, the contamination level at any location within a defined exercise area. The contamination level to be displayed by the apparatus is corrected to real time from a real time clock or may be displayed in response to a time input from a keyboard. In a preferred embodiment the location is defined by entering UTM grid reference coordinates using the keyboard. The mathematical model used by a microprocessor of the apparatus for simulation of contamination levels in the event of a nuclear explosion is described. (author)

  14. Radioimmunoassay apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    Apparatus for performing a quantitative radioimmunoassay comprising: a substantially spherical bead for carrying an antibody and a gripper for gripping said bead, said gripper comprising an integrally formed unit having a single elongate handle portion and a plurality of resilient fingers arranged at the base of the handle so that when said bead is secured within said fingers, said bead may be freely rotated about any diametric axis of the bead. In particular the invention relates to an apparatus for a two site immunoradiometric assay for serum ferritin in human blood samples. (author)

  15. Encephalographic apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    An X-ray apparatus is described for determining the size and location of brain tumours by tomography during pneumoencephalography. The apparatus comprises an image recording device arranged opposite an X-ray source and a frame mounted on a tiltable patient table and rotatable with respect to the table. A patient support is arranged in the frame and is rotatable with respect to the frame. Air injected into the patients' spinal column travels up into the brain and displaces some of the cerebral fluid. Tomographic X-ray exposures are made of the air bubble which moves around in the brain cavities as the patient is rotated. (U.K.)

  16. TRANSFORMER APPARATUS

    Science.gov (United States)

    Wolfgang, F.; Nicol, J.

    1962-11-01

    Transformer apparatus is designed for measuring the amount of a paramagnetic substance dissolved or suspended in a diamagnetic liquid. The apparatus consists of a cluster of tubes, some of which are closed and have sealed within the diamagnetic substance without any of the paramagnetic material. The remaining tubes are open to flow of the mix- ture. Primary and secondary conductors are wrapped around the tubes in such a way as to cancel noise components and also to produce a differential signal on the secondaries based upon variations of the content of the paramagnetic material. (AEC)

  17. Radiotherapy apparatus

    International Nuclear Information System (INIS)

    Leung, P.M.; Webb, H.P.J.

    1985-01-01

    This invention relates to apparatus for applying intracavitary radiotherapy. In previously-known systems radioactive material is conveyed to a desired location within a patient by transporting a chain of balls pneumatically to and from an appropriately inserted applicator. According to this invention a ball chain for such a purpose comprises several radioactive balls separated by non-radioactive tracer balls of radiographically transparent material of lower density and surface hardness than the radioactive balls. The invention also extends to radiotherapy treatment apparatus comprising a storage, sorting and assembly system

  18. Radiography apparatus

    International Nuclear Information System (INIS)

    Sashin, D.; Sternglass, E.J.

    1982-01-01

    The apparatus of the present invention provides radiography apparatus wherein the use of a flat, generally rectangular beam or a fan-shaped beam of radiation in combination with a collimator, scintillator and device for optically coupling a self-scanning array of photodiodes to the scintillator means will permit production of images or image data with high contrast sensitivity and detail. It is contemplated that the self-scanning array of photodiodes may contain from about 60 to 2048, and preferably about 256 to 2048, individual photodiode elements per inch of object width, thereby permitting maximum data collection to produce a complete image or complete collection of image data

  19. Monitoring apparatus

    International Nuclear Information System (INIS)

    Keats, A.B.

    1981-01-01

    An improved monitoring apparatus for use with process plants, such as nuclear reactors, is described. System failure in the acquisition of data from the plant, owing to stuck signals, is avoided by arranging input signals from transducers in the plant in a test pattern. (U.K.)

  20. Prehensile apparatus

    Science.gov (United States)

    Smith, C.M.

    1993-10-12

    The present invention relates to an apparatus for handling a workpiece comprising a vessel that is longitudinally extensible and pressurizable, and a nonextensible and laterally flexible member on the vessel. The member constrains one side of the vessel to be nonextensible, causing the vessel to bend in the direction of the nonextensible member when pressurized. 8 figures.

  1. NIF capsule performance modeling

    Directory of Open Access Journals (Sweden)

    Weber S.

    2013-11-01

    Full Text Available Post-shot modeling of NIF capsule implosions was performed in order to validate our physical and numerical models. Cryogenic layered target implosions and experiments with surrogate targets produce an abundance of capsule performance data including implosion velocity, remaining ablator mass, times of peak x-ray and neutron emission, core image size, core symmetry, neutron yield, and x-ray spectra. We have attempted to match the integrated data set with capsule-only simulations by adjusting the drive and other physics parameters within expected uncertainties. The simulations include interface roughness, time-dependent symmetry, and a model of mix. We were able to match many of the measured performance parameters for a selection of shots.

  2. Decontamination and partial dismantling of the Eurochemic plant. Part 1

    International Nuclear Information System (INIS)

    Detilleux, E.; Geens, L.; Hild, W.; Klonk, W.

    1980-09-01

    A description is given of the partial dismantling of the dissolver used for fuel elements of up to 1.6 wt % 235 U enrichment, and of the total dismantling of the dissolver for highly enriched fuel elements. The corresponding head-end cells have been decontaminated, allowing prolonged interventions, either in view of refurbishing or complete dismantling. An assessment of required manpower, dose commitments, material consumption, and waste production for all operations is given. (author)

  3. Achievements and prospects of robotics in dismantling operations

    International Nuclear Information System (INIS)

    Clement, G.; Goetghebeur, S.; Ravera, J.P.

    1993-01-01

    After a definition of 'robotic systems' (poly functionality is the main concept), the nuclear facilities that have used robotic systems for their dismantling are reviewed; the various robot intervention domains in dismantling, the different types of machines and the work carried out by robots are presented. Difficulties arising from robot utilization for reactor dismantling, robot design considerations, reliability, personnel training needs, tooling and costs are discussed. Applicability criteria are derived concerning radio protection, hard working conditions, task complexity, multiplicity and quality, and costs

  4. Remote dismantling of the French Brennilis nuclear power plant

    International Nuclear Information System (INIS)

    Studenski, Joerg

    2009-01-01

    The paper deals with the remote dismantling of the decommissioned EL4 prototype power plant Brennilis in France. The block contains the reactor pressure vessel including internals and biological shield, the piping and the control systems. The authors describe the general operation principle of the reactor to illustrate the peculiarities of the dismantling concept and the concept-related challenges. Detailed information is given concerning the following issues: creation of an access to the reactor block, the used remote technology, dismantling of the coolant piping and the axial shield, dismantling of the reactor pressure vessel and the lateral shield. Special attention is given on the minimization of the produced radioactive waste.

  5. Remote dismantling of the French Brennilis nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Studenski, Joerg [NUKEM Technologies GmbH (Germany)

    2009-07-01

    The paper deals with the remote dismantling of the decommissioned EL4 prototype power plant Brennilis in France. The block contains the reactor pressure vessel including internals and biological shield, the piping and the control systems. The authors describe the general operation principle of the reactor to illustrate the peculiarities of the dismantling concept and the concept-related challenges. Detailed information is given concerning the following issues: creation of an access to the reactor block, the used remote technology, dismantling of the coolant piping and the axial shield, dismantling of the reactor pressure vessel and the lateral shield. Special attention is given on the minimization of the produced radioactive waste.

  6. Clean-up and dismantling, Dismantling - legacy of the past, prospects for the future: CEA, a pioneer in the dismantling process, nuclear dismantling, research and innovation dedicated to dismantling

    International Nuclear Information System (INIS)

    Lorec, Amelie

    2016-01-01

    France - a world leader in the whole nuclear power cycle - is also responsible for the clean-up and dismantling of its end-of-life nuclear facilities. Here, the CEA is considered to be a pioneer both in the project ownership of work sites and in the R and D for optimising the timescales, costs and safety of those work sites. Its responsibilities range from defining the most appropriate scenario, characterising the radiological state of equipment and decontaminating premises, carrying out dismantling and optimising the resulting waste. With this wide range of skills and the diversity of its facilities, the CEA Nuclear Energy Division is developing innovative solutions which are already the subject of industrial transfers. Two-thirds of France's end-of-life nuclear facilities belong to the CEA - a situation connected with its history. This implies setting up clean-up and dismantling work sites which have unprecedented scientific, human and financial challenges. Every regulated nuclear installation (INB) (nuclear reactors, laboratories, etc.) has a limited operating life. When it stops being used, it is first cleaned up (removal of radioactive substances), then dismantled (disassembly of components) in accordance with the baseline safety requirements, and finally decommissioned so that it can be used for other purposes or be demolished. Cleanup and dismantling operations concern all the facility's components, such as hot (shielded) cells which can be found in some laboratories. As the owner of its clean-up and dismantling projects, the CEA also devotes a significant amount of R and D to reducing the timescales, costs and waste from current and future programmes, while improving their safety. The resulting innovations often lead to industrial transfers. (authors)

  7. Nuclear cleanup and decontamination for dismantling operations

    International Nuclear Information System (INIS)

    Bargues, S.; Solignac, Y.; Lapierre, Y.

    2003-01-01

    In the May 2003 issue of the review 'Controle', the French Nuclear Safety Authority (Autorite de Surete Nucleaire or ASN) reviewed the radiation protection and waste management principles applicable to dismantling operations carried out on nuclear installations, i.e. reactors, research laboratories, fuel cycle installations and nuclear power reactors. Estelle Chapelain, of the DGSNR (French General Directorate for Nuclear Safety and Radiation Protection), pointed out that dismantling work does not involve the same radioactive risks as operating an installation. For instance, 'the risk of disseminating radioactive material is generally greater because the dismantling process supposes the removal of one or more containment barriers'. In addition to this risk of internal exposure, the possibility of external irradiation of personnel must be taken into account due to the nature of the work carried out by the operators. The probability of conventional hazards is also accentuated, these hazards varying as work progresses (fire hazards during cutting operations, hazards associated with handling tasks, etc). Other risks must also be considered: hazards due to the ageing of installations, to loss of traceability, and finally the risks associated with waste management. Waste management falls within a strict regulatory framework specified by the decree dated December 31, 1999, which makes it compulsory to carry out a 'waste survey' with the aim of producing an inventory of waste and improving waste management. These surveys include 'waste zoning' to identify those areas liable to have been contaminated. These requirements lead operators to adapt their cleanup methodology in order to distinguish suspect rooms or equipment from those that can be deemed with certainty to be conventional. In its conclusion, the safety authority recalls the importance of 'the safety and radiation protection of dismantling operations being effectively managed and optimised, without imposing

  8. The dismantling of fast reactors: sodium processing

    International Nuclear Information System (INIS)

    Rodriguez, G.; Berte, M.; Serpante, J.P.

    1999-01-01

    Fast reactors require a coolant that does not slow down neutrons so water can not be used. Metallic sodium has been chosen because of its outstanding neutronic and thermal properties but sodium reacts easily with air and water and this implies that sodium-smeary components can not be considered as usual nuclear wastes. A stage of sodium neutralizing is necessary in the processing of wastes from fast reactors. Metallic sodium is turned into a chemically stable compound: soda, carbonates or sodium salts. This article presents several methods used by Framatome in an industrial way when dismantling sodium-cooled reactors. (A.C.)

  9. Capacitive tool standoff sensor for dismantlement tasks

    International Nuclear Information System (INIS)

    Schmitt, D.J.; Weber, T.M.; Liu, J.C.

    1996-01-01

    A capacitive sensing technology has been applied to develop a Standoff Sensor System for control of robotically deployed tools utilized in Decontamination and Dismantlement (D and D) activities. The system combines four individual sensor elements to provide non-contact, multiple degree-of-freedom control of tools at distances up to five inches from a surface. The Standoff Sensor has been successfully integrated to a metal cutting router and a pyrometer, and utilized for real-time control of each of these tools. Experiments demonstrate that the system can locate stationary surfaces with a repeatability of 0.034 millimeters

  10. Decommissioning and dismantling policy in Spain

    International Nuclear Information System (INIS)

    Landa, J.

    2004-01-01

    Decommissioning and dismantling nuclear installations is an increasingly important topic for governments, regulators, industries and civil society. There are many aspects that have to be carefully considered and planned, in many cases well in advance when they really need to be implemented. In my speech I am going to focus on policy-making considerations. Firstly I will go briefly over the current Spanish strategy on D and D, discussing the know-how we have gained from past experience. Then I will review the challenges that we will have to face in the near future, suggesting possible alternatives and approaches. I will finish talking a little bit about the international scene. (author)

  11. EXTRACTION APPARATUS

    Science.gov (United States)

    Ballard, A.E.; Brigham, H.R.

    1958-10-28

    An apparatus whereby relatlvely volatile solvents may be contacted with volatile or non-volatile material without certaln attendant hazards is described. A suitable apparatus for handling relatively volatlle liqulds may be constructed comprising a tank, and a closure covering the tank and adapted to be securely attached to an external suppont. The closure is provided with a rigidly mounted motor-driven agitator. This agitator is connected from the driving motor lnto the lnterlor of the tank through a gland adapted to be cooled witb inert gas thereby eliminating possible hazard due to frictional heat. The closure is arranged so that the tank may be removed from it without materially dlsturbing the closure which, as described, carrles the motor driven agitator and other parts.

  12. Centrifuge apparatus

    Science.gov (United States)

    Sartory, Walter K.; Eveleigh, John W.

    1976-01-01

    A method and apparatus for operating a continuous flow blood separation centrifuge are provided. The hematocrit of the entrant whole blood is continuously maintained at an optimum constant value by the addition of plasma to the entrant blood. The hematocrit of the separated red cells is monitored to indicate the degree of separation taking place, thereby providing a basis for regulating the flow through the centrifuge.

  13. CASTING APPARATUS

    Science.gov (United States)

    Gray, C.F.; Thompson, R.H.

    1958-09-23

    An apparatus is described for casting small quantities of uranlum. It consists of a crucible having a hole in the bottom with a mold positioned below. A vertical rcd passes through the hole in the crucible and has at its upper end a piercing head adapted to break the oxide skin encasing a molten uranium body. An air tight cylinder surrounds the crucible and mold, and is arranged to be evacuated.

  14. Radiography apparatus

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1985-01-01

    Apparatus for the inspection of pipe welds comprises a radiation source for transmitting radiation, say as X-rays, through a pipe weld and a detector in a box arranged diametrically opposite the source, with respect to the pipe, for detecting the transmitted radiation and providing electrical signals which are processed to produce an image of the weld. The source and detector are mounted on a frame which is rotatable about an inner frame clamped to the pipe. (author)

  15. The Dismantling of Nuclear Installations in France

    International Nuclear Information System (INIS)

    Bonnaure, P.

    2011-01-01

    As we saw in the previous article by Pierre Bonnaure, though it has long been decried for the dangers inherent in its production structures and the very long-lived waste that it generates, nuclear power may yet recover its credibility, particularly in France. However, on close examination, we see that the nuclear industry is beset by a number of unresolved questions, beginning with the dismantling of installations that have become obsolete or are set to become so. Nuclear power took off after the Second World War, but several generations of technology have been developed since then, and most currently functioning power-stations - mainly second-generation installations - are theoretically nearing the end of their useful lives, at least in terms of what was said when they were being built. The problem therefore arises of their dismantling and the clean-up of the sites on which they were built, a thorny question on which Pierre Bonnaure casts light in this article (prospects, strategies, financing, management of waste etc.). Unfortunately, it emerges that in France nothing has really been resolved, that public debate on the matter is decidedly limited and that investment (both financial investment and research) is not commensurate with the needs of a sector which is, after all, the source of three quarters of national electricity production. (author)

  16. Decontamination and dismantlement plan for international reviewing

    International Nuclear Information System (INIS)

    Wells, P.B.; Earle, O.K.; Klepikov, A.Kh.

    2000-01-01

    When developing a decommissioning plan, several factors need to be included. First and foremost is the issue of outline and scope. Specific to the BN-350, are issues related to short term tasks required to support the safe storage of the reactor for the next 50 years, and long term tasks required to dismantle the reactor, leaving some sort of final state, (brown field, green field, etc.) In addition, issues such as personnel and physical safety as well as environmental concerns must be addressed to ensure the shut down and dismantlement of the reactor is done in a safe manner, both for personnel and the environment. In addition to being the base document in which to support work, a D and D plan can also be utilized to obtain financial resources necessary to complete the plan, as is the case for the BN-350 Reactor located in Aktau, Kazakhstan. By providing a clear and complete D and D plan, which includes costs and schedules for each item, it is anticipated that donor countries will have the ability to review, approve, and provide financial support to complete the work described in the plan

  17. Dismantling without contaminating: The EUREX plant experience

    International Nuclear Information System (INIS)

    2001-01-01

    The EUREX pilot plant of ENEA Research Centre of Saluggia (Italy) reprocessed, between 1970 and 1983, some 600 elements and 1.5 tonnes of irradiated fuel from MTR and CANDU reactors. The general programme of denuclearization of the site actually focuses on the main priority of the conditioning of the about 400 m 3 of High and Low Level Liquid wastes stored in Saluggia. For this reason, in 1997 a project for the H and LLW conditioning, named 'CORA' has started. The 'CORA' unit will solidify the liquid wastes applying the Cold Crucible Melter (CCM) technology; due to the low volume amount of wastes to vitrify, the 'CORA' project has been accurately tailored in order to reduce social impact on public acceptance, costs and conditioning plant volumes to dismantle at the end of the work. For this reason, all the main nuclear components of the conditioning unit (input tank and pretreatment section, CC Melter, pot handling, off-gas system, interim glass storage) will be hosted inside four existing cells of the EUREX plant, duly dismantled. The EUREX plant services (electric and process fluid supplies, controlled areas, ventilation system...) will be reused too, revamped in some cases. The reuse of a nuclear plant which was built in the 60's, as the EUREX is, for future conditioning activities to be 'transplanted' there in the next years, it is not quite an easy job: the partial EUREX dismantling must permit an easy recovery of process areas and spread of contamination from old components (tanks, pipes, valves...) has to be minimized as far as possible. In order to minimize contamination spread, pipe cutting is made by a hydraulic shear, leaving the cut edges closed. Size reduction of pipes and tanks, to optimize the 5 m 3 steel storage containers filling is, as far as possible, made out of the working area of the cells. To achieve this goal a preliminary sketch of pipes to be cut and where the minimal cuts ought to be done is prepared before each intervention. The time

  18. Process cells dismantling of EUREX pant: previous activities

    International Nuclear Information System (INIS)

    Gili, M.

    1998-01-01

    In the '98-'99 period some process cells of the EUREX pant will be dismantled, in order to place there the liquid wastes conditioning plant 'CORA'. This report resumes the previous activities (plant rinsing campaigns and inactive Cell 014 dismantling), run in the past three years and the drawn experience [it

  19. The Japan Power Demonstration Reactor dismantling project. Radiation control

    International Nuclear Information System (INIS)

    Tomii, Hiroyuki; Seiki, Yoshihiro

    1996-01-01

    In the Japan Power Demonstration Reactor (JPDR) dismantling project, radiation control was performed properly with routine and special monitoring to keep the occupational safety and to collect data necessary for future dismantling of nuclear facilities. This report describes a summary of radiation control in the dismantling activities and some results of parametric analysis on dose equivalent evaluation, and introduces the following knowledge on radiological protection effectiveness of the dismantling systems applied in the project. a) Use of remote dismantling systems was effective in reducing equivalent workplace exposure. b) Utilization of existing facilities as radiation shield or radioactivity containment was effective in reducing workplace exposure, and also in increasing work efficiency. c) Use of underwater cutting systems was useful to minimize air contamination, and to reduce the dose equivalent rate in the working area. d) In the planning of dismantling, it is necessary to optimize the radiation protection by analyzing dismantling work procedures and evaluating radiological features of the dismantling systems applied, including additional work which the systems require brought from such activities. (author)

  20. Shielded Cells D ampersand D and Dismantlement System Requirements

    International Nuclear Information System (INIS)

    Witherspoon, R.L.

    1995-01-01

    This document describes the basis for the development of the System for Highly Radioactive Equipment Dismantlement or SHRED. It is the result of a thorough investigation into current and past dismantlement practices at shielded cell facilities around the DOE complex. This information has been used to formulate the development requirements for the SHRED

  1. Abrasive water jet cutting technique for biological shield concrete dismantlement

    International Nuclear Information System (INIS)

    Konno, T.; Narazaki, T.; Yokota, M.; Yoshida, H.; Miura, M.; Miyazaki, Y.

    1987-01-01

    The Japan Atomic Energy Research Institute (JAERI) is developing the abrasive-water jet cutting system to be applied to dismantling the biological shield walls of the JPDR as a part of the reactor dismantling technology development project. This is a total system for dismantling highly activated concrete. The concrete biological shield wall is cut into blocks by driving the abrasive-water jet nozzle, which is operated with a remote, automated control system. In this system, the concrete blocks are removed to a container, while the slurry and dust/mist which are generated during cutting are collected and treated, both automatically. It is a very practical method and will quite probably by used for actual dismantling of commercial power reactors in the future because it can minimize workers' exposure to radioactivity during dismantling, contributes to preventing diffusion of radiation, and reduces the volume of contaminated secondary waste

  2. STMI: several years of experience in nuclear plant dismantling

    International Nuclear Information System (INIS)

    Moreau, J.C.

    1985-01-01

    Since 1977, when STMI performed its first dismantling operation, the Company appreciably improved in that field through important operations: the dismantling of the calciothermy and fluoration metal Pu preparation facility, in La Hague reprocessing plant; the dismantling of the slag treatment chain, associated to calciothermy and fluoration processes, in La Hague reprocessing plant; and the cleaning of EL4 cell in Marcoule. To perform these operations, STMI's operating teams, on top of decontamination and dismantling technologies, strived to improve handling and transportation technologies, and to nuclearize many equipments. In order to increase its technical efficiency, STMI signed a cooperation agreement with FRAMATOME company. Therefore, the union between the operational know-hows of STMI and the design experience of TECHNICATOME allow the needs of any customs facing a dismantling case to be satisfied [fr

  3. Radiography apparatus

    International Nuclear Information System (INIS)

    Vasseur, J.P.

    1976-01-01

    A novel apparatus for radiographic examination purposes comprising an x-ray source emitting a flat beam is described. Detectors are arranged in the plane of the beam in order each to pick up part of the beam. To avoid the Compton effect, each detector has associated with it an auxiliary detector which only receives the rays emitted by the Compton effect. An electrical circuit forms a predetermined linear combination of the signals respectively picked up by each detector and the associated auxiliary detector, this in order to prevent the errors which are due to the Compton effect when the beam passes through the body being analyzed

  4. Dismantling the nuclear research reactor Thetis

    Energy Technology Data Exchange (ETDEWEB)

    Michiels, P. [Belgoprocess, 2480 Dessel (Belgium)

    2013-07-01

    The research reactor Thetis, in service since 1967 and stopped in 2003, is part of the laboratories of the institution of nuclear science of the University of Ghent. The reactor, of the pool-type, was used as a neutron-source for the production of radio-isotopes and for activation analyses. The reactor is situated in a water pool with inner diameter of 3 m. and a depth of 7.5 m. The reactor core is situated 5.3 m under water level. Besides the reactor, the pool contains pneumatic loops, handling tools, graphite blocks for neutron moderation and other experimental equipment. The building houses storage rooms for fissile material and sources, a pneumatic circuit for transportation of samples, primary and secondary cooling circuits, water cleaning resin circuits, a ventilation system and other necessary devices. Because of the experimental character of the reactor, laboratories with glove boxes and other tools were needed and are included in the dismantling program. The building is in 3 levels with a crawl-space. The ground-floor contains the ventilation installation, the purification circuits with tanks, cooling circuits and pneumatic transport system. On the first floor, around the reactor hall, the control-room, visiting area, end-station for pneumatic transport, waste-storage room, fuel storage room and the labs are located. The second floor contains a few laboratories and end stations of the two high speed transfer tubes. The lowest level of the pool is situated under ground level. The reactor has been operated at a power of 150 kW and had a max operating power of 250 kW. Belgoprocess has been selected to decommission the reactor, the labs, storage halls and associated circuits to free release the building for conventional reuse and for the removal of all its internals as legal defined. Besides the dose-rate risk and contamination risk, there is also an asbestos risk of contamination. During construction of the installation, asbestos-containing materials were

  5. Simulation for preparation of dismantling operations

    International Nuclear Information System (INIS)

    Carrere, J.M.; Idasiak, J.M.

    2003-01-01

    New applications of 3D models are still emerging. At first, simulation of dismantling operations has been used to illustrate the proposed scenarios, with 3D views or animated films, for: - internal and external communication; - technical reviews; - presentation to Safety Authorities. It helps a lot to explain the structure of the facility to dismantle, the proposed solutions, to convince people that the study is detailed enough. But 3D modelling is an investment in time and money. A lot of time is spent in collecting the drawings, and checking them with pictures, videos, interviews of operators, new measurements. This investment can be much more exploited, during all the life time of the decommissioning project, to avoid problems during operations, and so to save a lot of money. It is possible to have navigation or even immersion inside 3D models of facilities to dismantle, so that the project team or the operators can be familiar with the configuration of rooms, of accesses, with the location of equipment. A 3D model can hardly be as detailed as the real facility. Some simplifications have to be done, to avoid having too heavy models. But in a training process, 3D-models help to have rapidly an overview of complex environments. Dose uptake simulation is becoming also a tool for decommissioning projects. It is possible to compute either off line, or even in real time, the dose uptake of the operators, and to compare easily different options for the ALARA principle: decontamination or not, use of shielding or not. It requires to have not only the geometrical model, but also a radiological model of the facility, but with the use of gamma camera and spectrometry, it becomes easier. 3D-models can be used to integrate in an user-friendly way all the knowledge of a facility to decommission, and to update that knowledge during operations: reports on construction, on exploitation, on shut-down, physical and radiological measurements, traceability of wastes. Progress are

  6. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  7. Method of dismantling cylindrical structure by cutting

    International Nuclear Information System (INIS)

    Harada, Minoru; Mitsuo, Kohei; Yokota, Isoya; Nakamura, Kenjiro.

    1989-01-01

    This invention concerns a method of cutting and removing cylindrical structures, for example, iron-reinforced concrete materials such as thermal shielding walls in BWR type power plants into block-like form. That is, in a method of cutting and removing the cylindrical structure from the side of the outer wall, the structural material is cut from above to below successively in the axial direction and the circumferential direction by means abrasive jet by remote operation and cut into blocks each of a predetermined size. The cut out blocks are successively taken out. Cutting of the material from above to below by remote operation and taking out of small blocks causes no hazards to human body. Upon practicing the present invention, it is preferred to use a processing device for slurry and exhaust gases for preventing scattering of activated dismantled pieces or powdery dusts. (K.M.)

  8. Prefiltration of gaseous effluents in plant dismantling

    International Nuclear Information System (INIS)

    Pilot, G.; Pourprix, M.

    1991-01-01

    The dismantling techniques and mainly the thermal cutting tools can create large amounts of airbone dust, possibly contaminated in the case of the cutting of radioactive materials. Among the secondary solid emissions, the aerosols constitute the most mobile part which can disseminate contamination in the cell where the cutting operation takes place and in the ventilation ducts up to the HEPA filters. An optimised prefiltration coupled with a captation device at the aerosol generating source allows to avoid the dissemination of the contamination, to increase the life of HEPA filters and thus to reduce the amount of solid wastes. The object in this work was to select one or several cleaning devices, selection that can be done from the knowledge of the physico-chemical characteristics of the gas and aerosols to deal with, the available cleaning devices and the implied facility

  9. The Grenoble CEA Center: dismantled and rehabilitated

    International Nuclear Information System (INIS)

    Anon.

    2013-01-01

    The denuclearization program of the CEA center in Grenoble was launched in 2001. It involves 6 nuclear facilities (3 research reactors: Melusine, Siloette, and Siloe, and 1 laboratory (LAMA) and 2 units for processing wastes). The dismantling works were finished at the end of 2012 and the 2013 program concerns: the demolition of the buildings homing Melusine and Siloe reactors, the final rehabilitation of the Siloe raft, and the final rehabilitation of the laboratory and of the waste processing units. The budget is 117*10 6 euros for Siloe, 28*10 6 euros for Melusine, 6*10 6 euros for Siloette, 70*10 6 euros for the LAMA, and 90*10 6 euros for the 2 waste processing units. (A.C.)

  10. Analysis of mechanical property data obtained from nuclear pressure vessel surveillance capsules

    International Nuclear Information System (INIS)

    Perrin, J.S.

    1977-01-01

    A typical pressure vessel surveillance capsule examination program provides mechanical property data from tensile, Charpy V-notch impact, and, in some cases, fracture mechanics specimens. This data must be analyzed in conjunction with the unirradiated baseline mechanical property data to determine the effect of irradiation on the mechanical properties. In the case of Charpy impact specimens, for example, irradiation typically causes an increase in the transition temperature, and a decrease in the upper shelf energy level. The results of the Charpy impact and other mechanical specimen tests must be evaluated to determine if property changes are occurring in the manner expected when the reactor was put into service. The large amount of data obtained from surveillance capsule examinations in recent years enables one to make fairly good predictions. After the changes in the mechanical properties of specimens from a particular surveillance capsule have been experimentally determined and evaluated, they must be related to the reactor pressure vessel. This requires a knowledge of the neutron fluence of the surveillance capsule, and the ratio of the surveillance capsule fluence to the pressure vessel wall fluence. This ratio is frequently specified by the reactor manufacturer, or can be calculated from a knowledge of the geometry and materials of the reactor components inside the pressure vessel. A knowledge of the exact neutron fluence of the capsule specimens and the capsule to vessel wall neutron fluence ratio is of great importance, since inaccuracies in these numbers cause just as serious a problem as inaccuracies in the mechanical property determinations. A further area causing analysis difficulties is problems encountered in recent capsule programs relating to capsule design, construction, operation, and dismantling. (author)

  11. Irradiation test plan of instrumented capsule(05F-01K) for nuclear fuel irradiation in Hanaro (Revision 1)

    Energy Technology Data Exchange (ETDEWEB)

    Sohn, Jae Min; Kim, B. G.; Choi, M. H. (and others)

    2006-09-15

    An instrumented capsule was developed to be able to measure fuel characteristics, such as fuel temperature, internal pressure of fuel rod, fuel pellet elongation, and neutron flux, etc., during the irradiation test of nuclear fuel in HANARO. The instrumented capsule for measuring and monitoring fuel centerline temperature and neutron flux was designed and manufactured. And then, to verify the design of the instrumented capsule in the test hole, it was successfully irradiated in the test hole of HANARO from March 14, 2003 to June 1, 2003 (53.84 full power days at 24 MW). In the year of 2004, 3 test fuel rods and the 03F-05K instrumented fuel capsule were designed and fabricated to measure fuel centerline temperature, internal pressure of fuel rod, and fuel axial deformation during irradiation test. Now, this capsule was successfully irradiated in the test hole OR5 of HANARO reactor from April 27, 2004 to October 1, 2004 (59.5 full power days at 24-30 MW). The capsule and fuel rods have been be dismantled and fuel rods have been examined at the hot cell of IMEF. The instrumented fuel capsule (05F-01K) was designed and manufactured for a design verification test of the dual instrumented fuel rods. The irradiation test of the 05F-01K instrumented fuel capsule will be carried out at the OR5 vertical experimental hole of HANARO.

  12. Design verification test of instrumented capsule (02F-11K) for nuclear fuel irradiation in HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Bong Goo; Sohn, J. M.; Oh, J. M. [and others

    2004-01-01

    An instrumented capsule is being developed to be able to measure fuel characteristics, such as fuel temperature, internal pressure of fuel rod, fuel elongation, and neutron flux, etc., during the irradiation test of nuclear fuel in HANARO. The instrumented capsule for measuring and monitoring fuel centerline temperature and neutron flux was designed and manufactured. The instrumented capsule includes three test fuel rods installed thermocouple to measure fuel centerline temperature and three SPNDs (Self-Powered Neutron Detector) to monitor the neutron flux. Its stability was verified by out-of-pile performance test, and its safety evaluation was also shown that the safety requirements were satisfied. And then, to verify the design of the instrumented capsule in the test hole, it was successfully irradiated in the test hole of HANARO from March 14, 2003 to June 1, 2003 (53.8 full power days at 24 MWth). During irradiation, the centerline temperature of PWR UO{sub 2} fuel pellets fabricated by KEPCO Nuclear Fuel Company and the neutron flux were continuously measured and monitored. The test fuel rods were irradiated at less than 350 W/cm to 5.13 GWD/MTU with fuel centerline peak temperature below 1,375 .deg. C. The structural stability of the capsule was satisfied by the naked eye in service pool of HANARO. The capsule and test fuel rods were dismantled and test fuel rods were examined at the hot cell of IMEF (Irradiated Material Examination Facility)

  13. Decommissioning of the AVR reactor, concept for the total dismantling

    International Nuclear Information System (INIS)

    Marnet, C.; Wimmers, M.; Birkhold, U.

    1998-01-01

    After more than 21 years of operation, the 15 MWe AVR experimental nuclear power plant with pebble bed high temperature gas-cooled reactor was shout down in 1988. Safestore decommissioning began in 1994. In order to completely dismantle the plant, a concept for Continued dismantling was developed according to which the plant could be dismantled in a step-wise procedure. After each step, there is the possibility to transform the plant into a new state of safe enclosure. The continued dismantling comprises three further steps following Safestore decommissioning: 1. Dismantling the reactor vessels with internals; 2. Dismantling the containment and the auxiliary units; 3. Gauging the buildings to radiation limit, release from the validity range of the AtG (Nuclear Act), and demolition of the buildings. For these steps, various technical procedures and concepts were developed, resulting in a reference concept in which the containment will essentially remain intact (in-situ concept). Over the top of the outer reactor vessel a disassembling area for remotely controlled tools will be erected that tightens on that vessel and can move down on the vessel according to the dismantling progress. (author)

  14. Dismantling of nuclear facilities: the industrial know-how

    International Nuclear Information System (INIS)

    Lellament, R.

    2004-01-01

    Numerous nuclear facilities in laboratories or research reactors have been decommissioned and dismantled over the 2 last decades throughout the world. The valuable feedback experience has allowed nuclear industry to design, upgrade and test specific techniques for dismantling. These techniques are efficient although they have been validated on a reduced number of nuclear power plants. In France only 3 power units have been dismantled: Chinon A1, A2 and Brennilis (EL4) and they are not representative of the real park of EDF'reactors. 6 PWR-type reactors have already been dismantled in the Usa. The results of a survey concerning 26 countries shows that the dismantling cost is around 320 dollars/kWe, it represents 15% of the construction cost which is far from being excessive as it is often read in the media. The dismantling costs can be broken into: - de-construction (25-55%), - wastes from dismantling (17-43%), - security and monitoring (8-13%), - site reclamation (5-13%), and - engineering and project management (5-24%). (A.C.)

  15. Dismantlement and Radioactive Waste Management of DPRK Nuclear Facilities

    International Nuclear Information System (INIS)

    Jooho, W.; Baldwin, G.T.

    2005-01-01

    One critical aspect of any denuclearization of the Democratic People's Republic of Korea (DPRK) involves dismantlement of its nuclear facilities and management of their associated radioactive wastes. The decommissioning problem for its two principal operational plutonium facilities at Yongbyun, the 5MWe nuclear reactor and the Radiochemical Laboratory reprocessing facility, alone present a formidable challenge. Dismantling those facilities will create radioactive waste in addition to existing inventories of spent fuel and reprocessing wastes. Negotiations with the DPRK, such as the Six Party Talks, need to appreciate the enormous scale of the radioactive waste management problem resulting from dismantlement. The two operating plutonium facilities, along with their legacy wastes, will result in anywhere from 50 to 100 metric tons of uranium spent fuel, as much as 500,000 liters of liquid high-level waste, as well as miscellaneous high-level waste sources from the Radiochemical Laboratory. A substantial quantity of intermediate-level waste will result from disposing 600 metric tons of graphite from the reactor, an undetermined quantity of chemical decladding liquid waste from reprocessing, and hundreds of tons of contaminated concrete and metal from facility dismantlement. Various facilities for dismantlement, decontamination, waste treatment and packaging, and storage will be needed. The shipment of spent fuel and liquid high level waste out of the DPRK is also likely to be required. Nuclear facility dismantlement and radioactive waste management in the DPRK are all the more difficult because of nuclear nonproliferation constraints, including the call by the United States for 'complete, verifiable and irreversible dismantlement,' or 'CVID.' It is desirable to accomplish dismantlement quickly, but many aspects of the radioactive waste management cannot be achieved without careful assessment, planning and preparation, sustained commitment, and long completion times

  16. Thermoforming apparatus

    International Nuclear Information System (INIS)

    Wallsten, H.I.

    1984-01-01

    Apparatus for manufacturing articles is disclosed in which a preheated sheet of thermoplastic material is intermittently fed to present successive preheated portions of the sheet in a work station having a forming tool for forming articles in each successive sheet portion and a stamping tool for co-operating with the forming tool to stamp the formed articles from the sheet. The forming tool has a plurality of forming dies which are movable successively and cyclically into the work station for forming articles in respective successive sheet portions. After each forming operation the stamping tool is brought into engagement with a resilient counter-surface on the forming die to stamp from the sheet the articles formed by that die

  17. Radiographic apparatus

    International Nuclear Information System (INIS)

    Dalton, B.L.

    1984-01-01

    This patent application describes a radiographic apparatus including an array of radiation sensors, a source of radiation for projecting a beam through a body and means for moving one of said source and array relative to the body and for producing an electrical signal representative of the movement of the other of said source and array needed to bring the array into register with the beam. Drive means are arranged to move the other of said source and array in response to the electrical signal. In one embodiment, the source is rotated by an amount measured by a grating and associated electronics. The required movement of the array to maintain registration is calculated and transmitted to a driver. Alternatively, a laser may be mounted with the same and the array driven so that the laser beam continuously impinges on a photocell mounted with the array. (author)

  18. Nuclab Marcoule: a dedicated waste management and dismantling support laboratory

    International Nuclear Information System (INIS)

    Dugne, Olivier; Bec-Espitalier, Lionel; Rosen, Jeremy

    2014-01-01

    Formerly dedicated to plutonium production support, NucLab was renovated to perform a wide range of analyses for dismantling, plant operation and process development activities mainly at Marcoule but also for external clients. The laboratory is a CEA entity in the Nuclear Energy Division. It provides services to several industrial operators (nuclear processes and power plants) in the fields of analytical chemistry, radioactivity measurements, in situ nuclear measurements, decontamination processes, industrial chemistry processes, and waste treatment. NucLab supports research, production, and dismantling activities in all areas of dismantling operations (authors)

  19. The dismantling of nuclear installations: The dismantling of nuclear installations at the CEA's Directorate for nuclear energy; The CEA's sanitation and dismantling works: example of one of the Marcoule UP1 program lots; Research and innovation in sanitation-dismantling; Global optimisation of the management of dismantling radioactive wastes

    International Nuclear Information System (INIS)

    Hauet, Jean-Pierre; Piketty, Laurence; Moitrier, Cyril; Blanchard, Samuel; Soulabaille, Yves; Georges, Christine; Dutzer, Michel; Legee, Frederic

    2016-01-01

    This publication proposes a set of four articles which addresses issues related to the dismantling of nuclear installations in France, notably for the different involved actors such as the CEA and the ANDRA. The authors more particularly address the issue and the general strategy of dismantling within the Directorate for nuclear energy of the CEA; comment the example of one of the Marcoule UP1 program lots to highlight sanitation and dismantling works performed by the CEA; discuss current research and innovation activities within the CEA regarding sanitation and dismantling; and comment how to globally optimise the management of radioactive wastes produced by dismantling activities

  20. High temperature radioisotope capsule

    International Nuclear Information System (INIS)

    Bradshaw, G.B.

    1976-01-01

    A high temperature radioisotope capsule made up of three concentric cylinders, with the isotope fuel located within the innermost cylinder is described. The innermost cylinder has hemispherical ends and is constructed of a tantalum alloy. The intermediate cylinder is made of a molybdenum alloy and is capable of withstanding the pressure generated by the alpha particle decay of the fuel. The outer cylinder is made of a platinum alloy of high resistance to corrosion. A gas separates the innermost cylinder from the intermediate cylinder and the intermediate cylinder from the outer cylinder

  1. Dismantling of nuclear facilities and related problems - Conference proceedings

    International Nuclear Information System (INIS)

    Tournebize, Frederic; Bordet, Didier; Charlety, Philippe; Gore, Thierry; Estrade, Jerome; Lemaire, Hermine; Ginet, Annick; Fabrier, Lionel; Evrard, Lydie; Furois, Timothee; Butez, Marc; Dutzer, Michel; Faure, Vincent; Billarand, Yann; Menuet, Lise; Lahaye, Thierry; Pin, Alain; Mougnard, Philippe; Charavy, Sylvain; Poncet, Philippe; Moggia, Fabrice; Dochy, Arnaud; Benjamin, Patrick; Poncet, Pierre-Emmanuel; Beneteau, Yannick; Richard, Jean-Baptiste; Pellenz, Gilles; Ollivier Dehaye, Catherine; Gerard, Stephane; Denissen, Luc; Davain, Henri; Duveau, Florent; Guyot, Jean-Luc; Ardellier, Luc

    2012-11-01

    The oldest French nuclear facilities, built for some of them in the 1950's for research or power generation purposes, have reached more or less the end of their life. More than 30 facilities have entered the shutdown or dismantling phase, among which 8 reactors of the very first generations of Electricite de France (EdF) reactors. The aim of this two-days conference is to take stock of the present day status and perspectives of the dismantling activity, to approach the question of the management of the wastes produced, and to share experience about large scale operations already carried out. This document gathers the available presentations given during this conference: 1 - the 'Passage' project (F. Tournebize); 2 - CEA-Grenoble: from Louis Neel to key enabling technologies (D. Bordet); 3 - Dismantling actions in France (L. Evrard); 4 - Securing control of long-term charges funding (T. Furois); 5 - Waste disposal projects and their contribution to the management of dismantling wastes (M. Butez); 6 - Specificities linked with dismantling activities (Y. Billarand); 7 - Dismantling safety: the ASN's point of view (L. Evrad); 8 - Labor Ministry viewpoint about the dismantling related questions (T. Lahaye); 9 - Consideration of organizational and human factors in dismantling operations: a new deal in the operators-service providers relation (L. Menuet); 10 - Diploma and training experience (A. Pin); 11 - Glove-boxes dismantling at La Hague plant - status and experience feedback (P. Mougnard); 12 - Dismantling of Siloe reactor (CEA-Grenoble): application of the ALARA approach (P. Charlety); 13 - BR3 - a complex dismantling: the neutron shield tank (NST) in remote operation and indirect vision (L. Denissen); 14 - Cleansing and dismantling of the Phebus PF containment (S. Charavy); 15 - Integration of dismantling at the design and exploitation stages of nuclear facilities (P. Poncet); 16 - Consideration during the design and exploitation stages of dispositions aiming at

  2. Evaluation formulas of manpower needs for dismantling of equipment in FUGEN-3. Dismantling process of the condenser removal

    International Nuclear Information System (INIS)

    Kubota, Shintaro; Izumo, Sari; Usui, Hideo; Kawagoshi, Hiroshi; Koda, Yuya; Nanko, Takashi

    2014-07-01

    Japan Atomic Energy Agency (JAEA) has been developing the PRODIA code which supports to make decommissioning plan and has been preparing evaluation formulas. Manpower needs for the dismantling of the condenser that had conducted from 2010 to 2012 was analyzed and compared with existing evaluation formulas. Applicability of evaluation formulas for a large scale reactor facility was confirmed in dismantling of the heat insulating materials and reliability of unit productivity factor was improved. The evaluation formula of work for clearance was made in dismantling of pipes and supports. Unit productivity factor of dismantling of feed water heaters which is applicable for a large scale reactor facility was derived. For derivation of unit productivity factor, statistically meaningful data was provided from the dismantling of the condenser. Manpower needs for dismantling of the condenser has positive correlation to the weight of equipment and can be described in linear expression. Reliability of each unit productivity factor will be improved with accumulating actual dismantling data in future. (author)

  3. Jose Cabrera dismantling and decommissioning project

    International Nuclear Information System (INIS)

    Ondaro, Manuel

    2013-01-01

    The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and

  4. Jose Cabrera dismantling and decommissioning project

    Energy Technology Data Exchange (ETDEWEB)

    Ondaro, Manuel [ENRESA, Madrid (Spain)

    2013-07-01

    The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and

  5. Dismantling of nuclear facilities. From a structural engineering perspective

    International Nuclear Information System (INIS)

    Block, Carsten; Henkel, Fritz-Otto; Bauer, Thomas

    2014-01-01

    The paper summarizes some important aspects, requirements and technical boundary conditions that need to be considered in dismantling projects in the nuclear sector from a structural engineering perspective. Besides general requirements regarding radiation protection, occupational safety, efficiency and cost effectiveness it is important to take into account other conditions which have a direct impact on technical details and the structural assessment of the dismantling project. These are the main aspects highlighted in this paper: - The structural assessment of dismantling projects has to be based on the as-built situation. - The limitations in terms of available equipment and space have to be taken into account. - The structural assessments are often non-standardized engineering evaluations. A selection of five dismantling projects illustrates the various structural aspects. (orig.)

  6. Environmental Assessment for decontamination and dismantlement, Pinellas Plant

    International Nuclear Information System (INIS)

    1995-06-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-1092) of the proposed decontamination and dismantlement of the Pinellas Plant in Largo, Florida. Under the Decontamination and Dismantlement EA, the DOE proposes to clean up facilities, structures, and utilities; dismantle specific structures; and mitigate or eliminate any environmental impacts associated with the cleanup, dismantlement, and related activities. Related activities include utilization of specific areas by new tenants prior to full-scale cleanup. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969. Therefore, the preparation of an environmental impact statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  7. Design and fabrication of test apparatuses for investigation on corrosivity of aqueous molybdate solution for structural materials

    International Nuclear Information System (INIS)

    Ishikawa, Koji; Inaba, Yoshitomo; Tsuchiya, Kunihiko

    2010-02-01

    In the solution irradiation method, which is proposed as new 99 Mo production method, the molybdate solution of an irradiation target flows in a capsule. However, the compatibility between the flowing aqueous molybdate solution and the structural materials of capsules and pipes was not clear. Therefore, test apparatuses for the investigation of the compatibility were designed and fabricated. Preliminary tests with the test apparatuses were also carried out, and it was confirmed that planed tests could be carried out. (author)

  8. DISMANTLING OF THE FUEL CELL LABORATORY AT RESEARCH CENTRE JUELICH

    International Nuclear Information System (INIS)

    Stahn, B.; Matela, K.; Bensch, D.; Ambos, Frank

    2003-01-01

    The fuel cell laboratory was constructed in three phases and taken into operation in the years 1962 to 1966. The last experimental work was carried out in 1996. After all cell internals had been disassembled, the fuel cell laboratory was transferred to shutdown operation in 1997. Three cell complexes, which differed, in particular, by the type of shielding (lead, cast steel, concrete), were available until then for activities at nuclear components. After approval by the regulatory authority, the actual dismantling of the fuel cell laboratory started in March 2000. The BZ I laboratory area consisted of 7 cells with lead shieldings of 100 to 250 mm thickness. This area was dismantled from April to September 2000. Among other things, approx. 30,000 lead bricks with a total weight of approx. 300 Mg were dismantled and disposed of. The BZ III laboratory area essentially consisted of cells with concrete shieldings of 1200 to 1400 mm thickness. The dismantling of this area started in the fir st half of 2001 and was completed in November 2002. Among other things, approx. 900 Mg of concrete was dismantled and disposed of. Since more than 90 % of the dismantled materials was measurable for clearance, various clearance measurement devices were used during dismantling. The BZ II laboratory area essentially consists of cells with cast steel shieldings of 400 to 460 mm thickness. In September 2002 it was decided to continue using this laboratory area for future tasks. The dismantling of the fuel cell laboratory was thus completed. After appropriate refurbishment, the fuel cell laboratory will probably take up operation again in late 2003

  9. Dismantling and decontamination of the PIVER prototype vitrification facility

    International Nuclear Information System (INIS)

    Jouan, A.

    1989-01-01

    The PIVER facility was dismantled for replacement by a new continuous pilot plant. The more important operation concerns the vitrification cell, containing equipments of the process, for complete disposal and maximum decontamination, requiring dismantling, cutting, conditioning and removal of equipment inside the cell. Manipulators, handling and cutting tools were used. Activity of removed material and irradiation of personal are followed during the work for matching intervention means to operation conditions [fr

  10. Purification apparatus

    Energy Technology Data Exchange (ETDEWEB)

    Mortenson, C.W.

    1982-04-27

    An apparatus is provided for converting sea or other undrinkable waters to drinkable water without the use of driven or moving parts. Reliance upon gradient effects is made to effect the vaporization of, for example, sea water, followed by the condensation of the vapor to form distilled water. Gradient effects are achieved through the provision of differentials in the thermal conductivity, capillary activity, adsorptive, absorptive and/or pressure characteristics of particulate materials, or combinations of such physicals. For example, a column is packed with material graded as to its conductivity, the least thermally conductive material being nearest the cold or ambient water that is to be purified. In packing the column each successive layer of material has a greater thermal conductivity than the layer beneath it with the most conductive being at the top near the outlet arm of the column. The final outlet arm or tube is unheated or is at a temperature lower than that of the topmost conductive material so that vapor reaching the outlet tube gets condensed. This tube leads to a container kept in a cool place as, for example, buried in the ground, as, for instance, at the seashore deep enough to be cooled or to be surrounded by water, thus keeping the condensate cold. Pure water so collected is removed by such means as is desired. Other impure, volatile liquids may be similarly purified.

  11. Capsule endoscopy: Beyond small bowel

    Directory of Open Access Journals (Sweden)

    Samuel N Adler

    2012-01-01

    Full Text Available In this article the brief and dramatic history of capsule endoscopy of the digestive tract is reviewed. Capsule endoscopy offers a non invasive method to diagnose diseases that affect the esophagus, small bowel and colon. Technological improvements relating to optics, software, data recorders with two way communication have revolutionized this field. These advancements have produced better diagnostic performance.

  12. Dismantling and waste management: CEA's strategy and research programs

    International Nuclear Information System (INIS)

    Behar, C.

    2012-01-01

    There are 3 main dismantling operations in CEA. First, the dismantling of the UP1 facility in the Marcoule site. UP1 was a reprocessing plant of nuclear fuels that operated from 1958 to 1997 and is now the biggest dismantling operation in the world. Its dismantling operation follows a 6-step scheme that will end in 2050. Secondly, the Passage project on the Grenoble site that concerns the dismantling of 3 research reactors (Siloette, Melusine and Siloe), of a laboratory dedicated to the analysis of active materials (Lama) and of a station for the processing of waste (Sted). Thirdly the Aladin project that concerns the installations of the Fontenay-aux-Roses site. The dismantling operations are complex because all the first research programs on high activity chemistry and on transuranium elements were performed in Fontenay-aux-Roses facilities and because ancient activities have to leave a clean place to be replaced by new ones. The radioactive waste produced by CEA enter the flow of waste that is normally processed and managed by ANDRA. Only high-activities waste have not yet a definitive solution, they are stored in waiting the opening of a geological repository. CEA leads research programs on the separation and transmutation of minor actinides and on the long-term behaviour of waste packages put in deep geological layers. (A.C.)

  13. Technology and costs for dismantling a Swedish nuclear power plant

    International Nuclear Information System (INIS)

    1979-10-01

    Various estimates concerning the costs of decommissioning a redundant nuclear power reactor to the green fields state are given in the literature. The purpose of this study is to provide background material for the Swedish nuclear power utilities to estimate the costs and time required to dismantle an ASEA-ATOM Boiling Water Reactor. The units Oskarshamn II and Barsebeck 1, both with an installed capacity of approximately 600 MW, serve as reference plants. The time of operation before final shutdown is assumed to be 40 years. Dismantling operations are initiated one year after shutdown. When the dismantling of the plant is finished, the site is to be released for unrestricted use. The costs for dismantling and subsequent final disposal of the radioactive waste are estimated at approximately SEK 500 million (approximately US dollars 120 million) in terms of 1979 prices. The sum includes 25% contingency. The dismantling cost is equivalent to 10-15% of the installation cost of an equivalent new nuclear power plant. The exact percentage is dependent on the interest rate during the construction period. It is shown in the study that a total dismantling can be accomplished in less than five years. This report is a compilation of studies performed by ASEA-ATOM and VBB based on premises given by KBS. The reports from these studies are presented in appendices. (Auth.)

  14. Decontamination and remote dismantling tests in the Itrec reprocessing plant

    International Nuclear Information System (INIS)

    Candelieri, T.; Gerardi, A.; Soffietto, G.

    1993-01-01

    The scope of this research is to evaluate the advantages of the rack removal system in the dismantling of reprocessing installations. The objective of this work is to verify experimentally the possibility of the decontamination of any particular module and the capability of the remote dismantling of components installed in the mobile rack. In particular, the main objective is to develop remotely operated equipment for the dismantling of centrifugal contactors. The decontamination of the equipment which represents the most important preliminary phase of the decommissioning operation, allowed to obtain low-level radioactivity. A supporting programme has been performed in order to collect sufficient data for the project and design of the remote dismantling machine. On the basis of technological cold test results, the project of the dismantling machine's construction has been optimized. Positive results obtained during the hot dismantling operations on the Rack 6 bis attested the effectiveness of the rack removal system as an original design which facilitates decommissioning of reprocessing plants. 2 tabs., 18 figs

  15. Method of dismantling a nuclear reactor

    International Nuclear Information System (INIS)

    Shirai, Masato; Hashimoto, Osamu.

    1984-01-01

    Purpose: To enable rapid and simple positioning for a plasma arc torch disposed to the inside of a nuclear reactor main body. Method: After removing the upper semi-spherical portion, fuel portion and control rod portion of a nuclear reactor, a rotary type girder is placed on the upper edge of a cylindrical portion remained after the removal of the upper semi-spherical portion. Then, the upper portion of a supporting rod provided with a swing arm having a plasma arc torch at the top end is situated at the center of the reactor main body. Then, the top end of the support rod is inserted to fix in the housing of control rod drives. Then, the swing arm is actuated to situate the plasma arc torch to a desired position to be cut, whereafter cutting is initiated while rotating the rotary type girder. Thus, plasma arc torch is moved horizontally along an arcuate trace, whereby pipeways, accessories or the likes disposed to the inside of the main body are at first cut and then the cylindrical portion constituting the main body is cut to dismantle the reactor. (Moriyama, K.)

  16. Mobile worksystems for decontamination and dismantlement

    International Nuclear Information System (INIS)

    Osborn, J.; Bares, L.C.; Thompson, B.R.

    1995-01-01

    Many DOE nuclear facilities have aged beyond their useful lifetimes. They need to be decommissioned in order to be safe for human presence in the short term, to eventually recover valuable materials they contain, and ultimately to be transitioned to alternative uses or green field conditions. Decontamination and dismantlement are broad classes of activities that will enable these changes to occur. Most of these facilities - uranium enrichment plants, weapons assembly plants, research and production reactors, and fuel recycling facilities - are dormant, though periodic inspection, surveillance and maintenance activities within them are on-going. DOE estimates that there are over 5000 buildings that require deactivation to reduce the costs of performing such work with manual labor. In the long term, 1200 buildings will be decommissioned, and millions of metric tons of metal and concrete will have to be recycled or disposed of The magnitude of the problem calls for new approaches that are far more cost effective than currently available techniques. This paper describes two technologies that are viable solutions for facility D ampersand D

  17. Mobile worksystems for decontamination and dismantlement

    Energy Technology Data Exchange (ETDEWEB)

    Osborn, J. [Carnegie Mellon Univ., Pittsburgh, PA (United States); Bares, L.C.; Thompson, B.R. [RedZone Robotics, Inc., Pittsburgh, PA (United States)

    1995-10-01

    Many DOE nuclear facilities have aged beyond their useful lifetimes. They need to be decommissioned in order to be safe for human presence in the short term, to eventually recover valuable materials they contain, and ultimately to be transitioned to alternative uses or green field conditions. Decontamination and dismantlement are broad classes of activities that will enable these changes to occur. Most of these facilities - uranium enrichment plants, weapons assembly plants, research and production reactors, and fuel recycling facilities - are dormant, though periodic inspection, surveillance and maintenance activities within them are on-going. DOE estimates that there are over 5000 buildings that require deactivation to reduce the costs of performing such work with manual labor. In the long term, 1200 buildings will be decommissioned, and millions of metric tons of metal and concrete will have to be recycled or disposed of. The magnitude of the problem calls for new approaches that are far more cost effective than currently available techniques. This paper describes a mobile workstation termed ROSIE, which provides remote work capabilities for D&D activities.

  18. Iraq nuclear facility dismantlement and disposal project

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, J R; Danneels, J [Sandia National Laboratories, Albuquerque, NM (United States); Kenagy, W D [U.S. Department of State, Bureau of International Security and Nonproliferation, Office of Nuclear Energy, Safety and Security, Washington, DC (United States); Phillips, C J; Chesser, R K [Center for Environmental Radiation Studies, Texas Tech University, Lubbock, TX (United States)

    2007-07-01

    The Al Tuwaitha nuclear complex near Baghdad contains a significant number of nuclear facilities from Saddam Hussein's dictatorship. Because of past military operations, lack of upkeep and looting there is now an enormous radioactive waste problem at Al Tuwaitha. Al Tuwaitha contains uncharacterised radioactive wastes, yellow cake, sealed radioactive sources, and contaminated metals. The current security situation in Iraq hampers all aspects of radioactive waste management. Further, Iraq has never had a radioactive waste disposal facility, which means that ever increasing quantities of radioactive waste and material must be held in guarded storage. The Iraq Nuclear Facility Dismantlement and Disposal Program (the NDs Program) has been initiated by the U.S. Department of State (DOS) to assist the Government of Iraq (GOI) in eliminating the threats from poorly controlled radioactive materials, while building human capacities so that the GOI can manage other environmental cleanups in their country. The DOS has funded the International Atomic Energy Agency (IAEA) to provide technical assistance to the GOI via a Technical Cooperation Project. Program coordination will be provided by the DOS, consistent with U.S. and GOI policies, and Sandia National Laboratories will be responsible for coordination of participants and for providing waste management support. Texas Tech University will continue to provide in-country assistance, including radioactive waste characterization and the stand-up of the Iraq Nuclear Services Company. The GOI owns the problems in Iraq and will be responsible for the vast majority of the implementation of the NDs Program. (authors)

  19. Cleaning of dismantled metals by electropolishing

    International Nuclear Information System (INIS)

    Wei, T.Y.; Chung, Z.J.; Lu, D.L.; Hsieh, J.C.

    1995-01-01

    A project of cleaning dismantled metals is going on at INER. The test work has been performed. Results showed that the activity decreased from 45 microSv/h to background level after 20 minutes electrolytic polishing. These cleaned metals could be reused through melting and fabricating. These metals could also be classified as BRC waste to facilitate the waste management if they can pass the identification and be admitted by the government authority. In order to achieve the planned target, some electro-decontamination facilities have been established. An automatic electropolishing facility with six cells was designed to clean the contaminated metals in plate type with dimensions less than 50 cm x 50 cm. Another automatic electropolishing facility was specially designed for treating the contaminated pipes. In addition, mobile electropolishing facilities were also established for large pieces of metal and some fixed equipment. In this cleaning project, a practical recycling and treatment method for electrolyte has been developed in order to comply with the requirement of secondary waste minimization

  20. Dismantling method for nuclear fuel assembly

    International Nuclear Information System (INIS)

    Yamazaki, Shuji; Kato, Akihiro; Yoshida, Masafumi.

    1993-01-01

    An upper nozzle is detached from a control rod guide tube and an instrumentation tube. Subsequently, slots (slits) having a predetermined width are formed longitudinally at enlarged diameter portions of the control rod guide tube and the instrumentation tube. Then, the control rod guide tube and the instrumentation tube are separated from a lower nozzle, and pulled out from the lattice space of each of the support lattices. Thereafter, a predetermined key is inserted to a key insertion window formed at each of the support lattices, to distort a spring and take the fuel rod out of the lattice space of each of the support lattices. With such procedures, when the control rod guide tube and the instrumentation tube are pulled out of the lattice space of the support lattice, the enlarged diameter portion is narrowed to reduce the diameter, thereby enabling to take them out easily. Accordingly, since the space for inserting the key can be ensured, the nuclear fuel assemblies can easily be dismantled. In addition, fuel rods can be taken out smoothly and in an intact state. (I.N.)

  1. Pneumatic capsule with a measuring system for in-pile irradiation

    International Nuclear Information System (INIS)

    Oshima, Keiichi; Yamazaki, Yasaburo; Hirata, Mitsuho; Ishii, Toshio; Shimozawa, Ryohei.

    1967-01-01

    A prior-art in-pile irradiation apparatus wherein a rabbit containing an irradiation specimen therein is inserted into and removed from a pile by a pneumatic system does not include means for measuring the temperature and pressure of the specimen under irradiation. When the rabbit is deformed during irradiation, it cannot be reliably recovered. A pneumatic capsule assembly with a measuring system according to this invention has a double structure which consists of an inner capsule containing the specimen therein and an outer capsule evacuated or filled with a gas. A thermocouple lace wire and a strain gauge are welded on the outside surface of the inner capsule as detection terminals for measuring the temperature and pressure. A rupture plate which bursts when the pressure in the inner capsule reaches a predetermined value is provided at a part of the inner capsule, and a fin for heat transmission is provided between the inner and outer capsules to thus prevent the deformation of the pneumatic capsule assembly as a whole. (Takasuka, S.)

  2. Dismantling the Curriculum in Higher Education

    Directory of Open Access Journals (Sweden)

    Richard Hall

    2016-04-01

    Full Text Available The higher education curriculum in the global North is increasingly co-opted for the production of measurable outcomes, framed by determinist narratives of employability and enterprise. Such co-option is immanent to processes of financialisation and marketisation, which encourage the production of quantifiable curriculum activities and tradable academic services. Yet the university is also affected by global socio-economic and socio-environmental crises, which can be expressed as a function of a broader crisis of social reproduction or sociability. As the labour of academics and students is increasingly driven by a commodity-valuation rooted in the measurement of performance, the ability for academics and students to respond to crises from inside the university is constrained by the market. This article argues that in understanding the relationship between the university and society, and in responding to a crisis of sociability, revealing the bounded nature of the curriculum is central. One possible way to address this crisis is by re-imagining the university through the co-operative practices of groups like the Dismantling the Masters House community and the Social Science Centre. Such an exploration, rooted in the organising principles of the curriculum, asks educators to consider how their curriculum reproduces an on-going colonisation by Capital. It is argued that such work enables a re-imagination of higher education that is rooted in a co-operative curriculum, and which might enable activist-educators to build an engaged curriculum, through which students and academics no longer simply learn to internalise, monitor and manage their own alienation.

  3. Dismantling at the CEA's Nuclear Energy Division: strategy and programmes

    International Nuclear Information System (INIS)

    Lecomte, C.; Prunele, D. de; Rozain, J.P.; Nokhamzon, J.G.; Tallec, M.

    2008-01-01

    The CEA's Nuclear Energy Division (DEN) nuclear facilities currently include seventeen reactors and thirty six other miscellaneous facilities, particularly laboratories, fuel processing units and facilities specific to waste management. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R and D facilities in line with the issues of the nuclear industry of the future. At CEA, the first nuclear facility dismantling operations go back several dozen years and involve numerous and varied facilities. The first operations of any significance took place in the 1960's and 1970's and covered, for example, the first plutonium plant at Fontenay-aux-Roses (total dismantling) and small research reactors or critical models - CESAR and PEGGY at Cadarache and MINERVE at Fontenay-aux Roses (civil engineering cleaned up and kept). At La Hague, the dismantling of AT1, a pilot workshop used by the CEA during the 1970's to process irradiated fuels from fast neutron reactors, was completed in March 2001 (IAEA former stage 3, excluding civil engineering demolition). On the other hand, during this period of first dismantling, the intermediate-sized reactors (G1, Rapsodie) were only partially dismantled after shut down, mainly due to the lack of graphite and sodium waste management routes at the time. About twenty facilities were thus dealt with up to 2001, in other words about half of all the nuclear facilities shut down permanently before this date. (authors)

  4. Dismantlement and Radioactive Waste Management of DPRK Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jooho, W.; Baldwin, G. T.

    2005-04-01

    One critical aspect of any denuclearization of the Democratic People’s Republic of Korea (DPRK) involves dismantlement of its nuclear facilities and management of their associated radioactive wastes. The decommissioning problem for its two principal operational plutonium facilities at Yongbyun, the 5MWe nuclear reactor and the Radiochemical Laboratory reprocessing facility, alone present a formidable challenge. Dismantling those facilities will create radioactive waste in addition to existing inventories of spent fuel and reprocessing wastes. Negotiations with the DPRK, such as the Six Party Talks, need to appreciate the enormous scale of the radioactive waste management problem resulting from dismantlement. The two operating plutonium facilities, along with their legacy wastes, will result in anywhere from 50 to 100 metric tons of uranium spent fuel, as much as 500,000 liters of liquid high-level waste, as well as miscellaneous high-level waste sources from the Radiochemical Laboratory. A substantial quantity of intermediate-level waste will result from disposing 600 metric tons of graphite from the reactor, an undetermined quantity of chemical decladding liquid waste from reprocessing, and hundreds of tons of contaminated concrete and metal from facility dismantlement. Various facilities for dismantlement, decontamination, waste treatment and packaging, and storage will be needed. The shipment of spent fuel and liquid high level waste out of the DPRK is also likely to be required. Nuclear facility dismantlement and radioactive waste management in the DPRK are all the more difficult because of nuclear nonproliferation constraints, including the call by the United States for “complete, verifiable and irreversible dismantlement,” or “CVID.” It is desirable to accomplish dismantlement quickly, but many aspects of the radioactive waste management cannot be achieved without careful assessment, planning and preparation, sustained commitment, and long

  5. Development of multi-functional telerobotic systems for reactor dismantlement

    International Nuclear Information System (INIS)

    Fujii, Yoshio; Usui, Hozumi; Shinohara, Yoshikuni

    1992-01-01

    This report summarizes technological features of advanced telerobotic systems for reactor dismantling application developed at the Japan Atomic Energy Research Institute. Taking into consideration the special environmental conditions in reactor dismantling, major effort was made to develop multifunctional telerobotic system of high reliability which can be used to perform various complex tasks in an unstructured environment and operated in an easy and flexible manner. The system development was carried out through constructing three systems in seccession; a light-duty and a heavy-duty system as a prototype system for engineering test in cold environment, and a demonstration system for practical on-site application to dismantling highly radioactive reactor internals of an experimental boiling water reactor JPDR (Japan Power Demonstration Reactor). Each system was equipped with one or two amphibious manipulators which can be operated in either a push-button manual, a bilateral master-slave, a teach-and-playback or a programmed control mode. Different scheme was adopted in each system at designing the manipulator, transporter and man-machine interface so as to compare their advantages and disadvantages. According to the JPDR decommissioning program, the demonstration system was successfully operated to dismantle a portion of the radioactive reactor internals of the JPDR, which used underwater plasma arc cutting method and proved the usefulness of the multi-functional telerobotic system for reducing the occupational hazards and enhancing the work efficiency in the course of dismantling highly radioactive reactor components. (author)

  6. Overall strategy of Creys Malville power station dismantling

    International Nuclear Information System (INIS)

    Alphonse, P.

    2002-01-01

    The power station was stopped by a government decision following the elections in 1997. This shutdown was then made official by a letter dated April 1998 and the decree of December 1998. This was a non-technical shutdown and as such had not been envisaged; there has been no early warning. Current dismantling strategy: The studies leading to shutdown and then dismantling were engaged in 1998 based on a scenario with a status corresponding to IAEA level 2 until 2046. In 2001, EDF management made the decision to dismantle all the first generation power stations and Creys Malville between now and 2025. It should be noted that the presence of strongly irradiated stellite in the Creys Malville reactor would still require remote systems for working in the reactor block after 2046. The sequence of operations dictated by the dismantling strategy is as follows: eliminate the risks as soon as possible and in particular the risk related to the sodium, 3300 tonnes of which is kept in liquid form in the reactor vessel; dismantle the most active parts which are too radioactive to be sent to the existing or planned storage centres. This may lead to on-site storage to allow decay to occur before sending to a storage centre; planning of the work interventions in order to limit the costs

  7. Dismantling and waste managing benefit from digital technologies

    International Nuclear Information System (INIS)

    Moitrier, C.

    2017-01-01

    Dismantling is a very important challenge for nuclear industry as its success will prove the ability of the industry to deal with all the stages of a nuclear power plant from design to the end. A dismantling project is constraint by costs, time, feasibility, safety and environment protection and all of this implies a perfect knowledge of both the initial state of the facility at the beginning of the dismantling and the supply chain to avoid delays and extra-costs. Digital tools have a very important role to play as a provider of a 3-dimensional digital twin of the facility. This digital model allows: a remote preparation of the dismantling actions, to assess and optimize the radiation exposure during the intervention, to simulate various scenarios and select the most adequate, to ease collaborative work between various teams, to assess the volume and kind of waste at a very early stage of the dismantling, and to train operators and workers for x. (A.C.)

  8. Soft gelatin capsules (softgels).

    Science.gov (United States)

    Gullapalli, Rampurna Prasad

    2010-10-01

    It is estimated that more than 40% of new chemical entities (NCEs) coming out of the current drug discovery process have poor biopharmaceutical properties, such as low aqueous solubility and/or permeability. These suboptimal properties pose significant challenges for the oral absorption of the compounds and for the development of orally bioavailable dosage forms. Development of soft gelatin capsule (softgel) dosage form is of growing interest for the oral delivery of poorly water soluble compounds (BCS class II or class IV). The softgel dosage form offers several advantages over other oral dosage forms, such as delivering a liquid matrix designed to solubilize and improve the oral bioavailability of a poorly soluble compound as a unit dose solid dosage form, delivering low and ultra-low doses of a compound, delivering a low melting compound, and minimizing potential generation of dust during manufacturing and thereby improving the safety of production personnel. However, due to the very dynamic nature of the softgel dosage form, its development and stability during its shelf-life are fraught with several challenges. The goal of the current review is to provide an in-depth discussion on the softgel dosage form to formulation scientists who are considering developing softgels for therapeutic compounds.

  9. Status of irradiation capsule design

    International Nuclear Information System (INIS)

    Nagata, Hiroshi; Yamaura, Takayuki; Nagao, Yoshiharu

    2013-01-01

    For the irradiation test after the restart of JMTR, further precise temperature control and temperature prediction are required. In the design of irradiation capsule, particularly sophisticated irradiation temperature prediction and evaluation are urged. Under such circumstance, among the conventional design techniques of irradiation capsule, the authors reviewed the evaluation method of irradiation temperature. In addition, for the improvement of use convenience, this study examined and improved FINAS/STAR code in order to adopt the new calculation code that enables a variety of analyses. In addition, the study on the common use of the components for radiation capsule enabled the shortening of design period. After the restart, the authors will apply this improved calculation code to the design of irradiation capsule. (A.O.)

  10. Features of rotary pump diagnostics without dismantling

    Directory of Open Access Journals (Sweden)

    Sergeev K. О.

    2017-12-01

    Full Text Available In ship power plants, rotor pumps have become very popular providing the transfer of various viscous fluids: fuels, oils, etc. Like all ship's mechanisms, pumps need proper maintenance and monitoring of technical condition. The most expedient is maintenance and repair carried out according to the results of dismantling diagnosis. The methods of vibrodiagnostics are mostly widespread for the diagnosis of pumps. Vibrodiagnosis of rotary pumps has a number of features due to the nature and condition of pumped fluids. The norms of the Russian Maritime Register of Shipping are used for setting standards of vibration and diagnostics of the rotary pumps' technical condition. To clarify the features of vibration diagnostics of rotary pumps some measurements have been made on a special bench that simulates various modes of ship's pumps' operation: different pressure in the system and temperature of the pumped medium. As a result of measurements one-third octave and narrow-band vibration spectra of pumps have been obtained at various developed pressures and temperatures of the pumped fluid. The performed analysis has shown that the RMRS norms for diagnostics of ship rotary pumps have insufficient informative value inasmuch they do not take into account the dependence of the vibrational signal spectrum on the developed pressure and temperature of the pumped fluid. The nature of the received signals shows that the levels of a third-octave spectrum of the vibration velocity depend significantly on the temperature of the pumped fluids, this fact must be taken into account when applying the RMRS norms. The fluid temperature has a great influence on the nature of the narrow-band vibration acceleration spectrum in the area of medium frequencies, less influence – on the nature of the vibration velocity spectrum. The conclusions have been drawn about the advisability of using the narrow-band vibration spectra and the envelope spectra of the high

  11. Development of telerobotic manipulators for reactor dismantling work

    International Nuclear Information System (INIS)

    Shinohara, Yoshikuni; Usui, Hozumi; Fujii, Yoshio

    1991-01-01

    This paper describes the amphibious electrical manipulators JARM-10, JART-25, JART-100 and JARM-25 which were developed in the program of reactor decommissioning technology development carried out by the Japan Atomic Energy Research Institute. They are multi-functional telerobotic light-duty (10 and 25 daN) and heavy-duty (100 daN) Manipulators which can be used in hostile environments in reactor dismantling work such as high radiation, underwater work and electrical noise. Each manipulator can be operated in either a bilateral master-slave, a teach-and-playback or a programmed control mode. By combining these modes appropriately, it is possible to perform complex tasks of remote handling. The usefulness of the telerobotic systems for dismantling nuclear reactors has been demonstrated by successful application of the JARM-25 for remote underwater dismantlement of highly radioactive reactor internals of complex form of an experimental nuclear power reactor. (author)

  12. Decommissioning and dismantling of the reprocessing plant Karlsruhe

    International Nuclear Information System (INIS)

    Eiben, K.; Fritz, P.

    1995-01-01

    Reprocessing activities were discontinued in late 1990. The facility was drained and rinsed, and 80 m3 of HLWC have since been stored in special tanks, awaiting vitrification. Decommissioning work is scheduled to proceed in six phases. The reprocessing areas of the facility will be prepared for release from radiological control and dismantled in the first phase. The remaining facilities can be deregulated, and storage tanks dismantled, only after termination of phase 1. The goal of the following phase is clearance from radiological control of all controlled areas, and the last phase is to cover dismantling of all buildings and restoration of a green field site. The overall costs of these activities are estimated to amount to DM 1.657 million. The article explains the contents of the first permits for decommissioning as well as the documents prepared for planning of work and licence application. (orig./HP) [de

  13. Evaluation of worker's dose on a virtual dismantling environment

    International Nuclear Information System (INIS)

    Park, Hee Seong; Kim, Sung Hyun; Park, Byung Suk; Yoon, Ji Sup

    2007-01-01

    The motivation of this study is to provide a basis for a minimization of worker's dose during dismantling activities. In the present study, we proposed methods for identifying an existence of radioactivity which is contained in the dismantling objects and for evaluating a worker's dose under a virtual dismantling environment. To evaluate a worker's external dose, the shape of the exposure room in the KRR 2(Korean Research Reactor TRIGA MARK III) by 3D CAD was created and the radiation dose surrounding the facility by using MCNP- 4C(Monte Carlo N-Particle-4C) was calculated. The radiation field of the exposure room was visualized three dimensionally by using the radiation dose that was obtained by the code

  14. REUSE OF AUTOMOTIVE COMPONENTS FROM DISMANTLED END OF LIFE VEHICLES

    Directory of Open Access Journals (Sweden)

    Piotr NOWAKOWSKI

    2013-12-01

    Full Text Available The problem of recycling end of life automotive vehicles is serious worldwide. It is one of the most important streams of waste in developed countries. It has big importance as recycling potential of raw materials content in automotive vehicles is valuable. Different parts and assemblies after dismantling can also be reused in vehicles where replacement of specific component is necessary. Reuse of the components should be taken into consideration in selecting the vehicles dismantling strategy. It also complies with European Union policy concerning end of life vehicles (ELV. In the paper it is presented systematic approach to dismantling strategies including disassembly oriented on further reuse of components. It is focused on decision making and possible benefits calculation from economic and environmental point of view.

  15. Large Rotor Test Apparatus

    Data.gov (United States)

    Federal Laboratory Consortium — This test apparatus, when combined with the National Full-Scale Aerodynamics Complex, produces a thorough, full-scale test capability. The Large Rotor Test Apparatus...

  16. Gamma tomography apparatus

    International Nuclear Information System (INIS)

    Span, F.J.

    1988-01-01

    The patent concerns a gamma tomography apparatus for medical diagnosis. The apparatus comprises a gamma scintillation camera head and a suspension system for supporting and positioning the camera head with respect for the patient. Both total body scanning and single photon emission tomography can be carried out with the apparatus. (U.K.)

  17. ROLLER FILTRATION APPARATUS

    DEFF Research Database (Denmark)

    2017-01-01

    The present invention relates to the field of filtering, more precisely the present invention concerns an apparatus and a method for the separation of dry matter from a medium and the use of said apparatus. One embodiment discloses an apparatus for the separation of dry matter and liquid from a m...

  18. Pore roller filtration apparatus

    DEFF Research Database (Denmark)

    2014-01-01

    The present invention relates to the field of filtering, more precisely the present invention concerns an apparatus and a method for the separation of dry matter from a medium and the use of said apparatus. One embodiment discloses an apparatus for the separation of dry matter from a medium, comp...

  19. Gamma apparatuses for radiotherapy

    International Nuclear Information System (INIS)

    Sul'kin, A.G.

    1986-01-01

    Scientific and technical achievements in development and application of gamma therapeutic apparatuses for external and intracavity irradiations are generalized. Radiation-physical parameters of apparatuses providing usability of progressive methods in radiotherapy of onclogical patients are given. Optimization of main apparatus elements, ensurance of its operation reliability, reduction of errors of irradiation plan reproduction are considered. Attention is paid to radiation safety

  20. Atomic Energy Commission (CEA) dismantling experience review and perspectives

    International Nuclear Information System (INIS)

    Barre, J.Y.

    1992-01-01

    Reorganization and dismantling have been part of the CEA's facility renewal process for more than twenty years now. Many facilities have already been downrated or will be in the near future. The strategy developed so far is founded on acquired experience, on the basis of which it may be said that: nuclear facilities are reversible in full and strict compliance with safety and security rules; a field of competence has been developed that will help French industries to land on their feet when the time comes on the dismantling market; public opinion has been informed as to the soundness of the energy alternatives chosen

  1. Radiation protection aspects of dismantling and decommissioning of Uranium Mining of Andujar (Spain)

    International Nuclear Information System (INIS)

    Ortiz Ramis, M.T.; Garcia-Bermejo Fernandez, R.; Martin Palomo, N.

    1995-01-01

    This study analyzes the radiation protection aspects during the decommissioning and dismantling of uranium mining in Andujar (Spain). The application during dismantling's mining, the transfer factor of natural radioactive isotopes and the application during the sterile movements are presented

  2. 49 CFR 1242.42 - Administration, repair and maintenance, machinery repair, equipment damaged, dismantling retired...

    Science.gov (United States)

    2010-10-01

    ... repair, equipment damaged, dismantling retired property, fringe benefits, other casualties and insurance, lease rentals, joint facility rents, other rents, depreciation, joint facility, repairs billed to others... maintenance, machinery repair, equipment damaged, dismantling retired property, fringe benefits, other...

  3. Lessons learned. Optimization of the plant structure at the beginning of the dismantling process

    International Nuclear Information System (INIS)

    Sesterhenn, Kurt

    2008-01-01

    The processes of shutdown and dismantling of the NPP Muehlheim-Kaerlich included several steps: conservation operation including fuel element removal, decontamination and radiological characterization, conservation of components that may still be used, removal and disposal of operating supply items, preparation of concepts for the dismantling process and realization of dismantling. The authors describe in detail the safety concept, the waste tracking program, the operational organization and reduction of area subject to radiological surveillance during the dismantling and renaturation project.

  4. The further development and evaluation of an automatic dismantler of short staple ring-spun yarns

    CSIR Research Space (South Africa)

    Fassihi, A

    2014-07-01

    Full Text Available Information System (AFIS) single fiber length tests, the fibers from automatically dismantled ring-spun cotton yarns are very similar in their properties to those dismantled by hand (manually). It was also found that, at a speed of 2 m/min, the yarn dismantler...

  5. Summary Report for Capsule Dry Storage Project

    Energy Technology Data Exchange (ETDEWEB)

    JOSEPHSON, W S

    2003-09-04

    There are 1.936 cesium (Cs) and strontium (Sr) capsules stored in pools at the Waste Encapsulation and Storage Facility (WESF). These capsules will be moved to dry storage on the Hanford Site as an interim measure to reduce risk. The Cs/Sr Capsule Dry Storage Project (CDSP) is conducted under the assumption the capsules will eventually be moved to the repository at Yucca Mountain, and the design criteria include requirements that will facilitate acceptance at the repository. The storage system must also permit retrieval of capsules in the event vitrification of the capsule contents is pursued. A cut away drawing of a typical cesium chloride (CsCI) capsule and the capsule property and geometry information are provided in Figure 1.1. Strontium fluoride (SrF{sub 2}) capsules are similar in design to CsCl capsules. Further details of capsule design, current state, and reference information are given later in this report and its references. Capsule production and life history is covered in WMP-16938, Capsule Characterization Report for Capsule Dry Storage Project, and is briefly summarized in Section 5.2 of this report.

  6. Provisions for the dismantling of nuclear facilities are sufficient

    International Nuclear Information System (INIS)

    Le Ngoc, B.

    2016-01-01

    The European Union has assessed the provisions made by the nuclear plant operators to face the future costs of dismantling. The United-Kingdom and the Netherlands are the single E.U. members to have provisions covering the whole of the expenses (respectively 100% and 94%). The figure for France is very low 33% (far below the European average of 56%). According to French authorities the provisions for the dismantling of nuclear facilities are strictly defined by law: they must be made progressively till the decommissioning and they must be composed by dedicated assets. The costs of the dismantling is regularly re-assessed for taking into account technological progress and changes in regulation. Furthermore the French system limits the period in which provisions are made to the initial operating life of the plant: mostly 40 years which is a prudent measure. In other E.U. members like Germany, the provisions are not covered by dedicated assets which might endanger the capacity of the operator to face the future costs. The progressiveness of the French systems of provision-making is fair because the dismantling costs are spread equally over the entire operating period of the facility. (A.C.)

  7. Advanced robotic remote handling system for reactor dismantlement

    International Nuclear Information System (INIS)

    Shinohara, Yoshikuni; Usui, Hozumi; Fujii, Yoshio

    1991-01-01

    An advanced robotic remote handling system equipped with a multi-functional amphibious manipulator has been developed and used to dismantle a portion of radioactive reactor internals of an experimental boiling water reactor in the program of reactor decommissioning technology development carried out by the Japan Atomic Energy Research Institute. (author)

  8. Dismantling Racial and Hegemonic Boundaries for an Inclusive ...

    African Journals Online (AJOL)

    ... expressed experiences of hostile institutional cultures, untransformed curricula that are largely based on European traditions and norms and a general atmosphere that is tilted towards white supremacy. The article also gives specifi c attention to the formation of a unifying organisational culture, requisite for dismantling

  9. Pick-N-Pull Auto Dismantlers, Kansas City, LLC Inc.

    Science.gov (United States)

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Pick-N-Pull Auto Dismantlers, Kansas City, LLC, a subsidiary of Schnitzer Steel Industries, Inc., for alleged violations at its facilities at 8012 East Truman Rd., Kansas C

  10. Dismantling of JPDR begins: to demonstrate advanced technology

    Energy Technology Data Exchange (ETDEWEB)

    1986-12-01

    The first dismantling of the Japan Power Demonstration Reactor (JPDR, BWR, 90 MWt, 12.5 MWe) began on December 4, 1986, claiming the attention of nuclear interests in Japan and overseas. The Japan Atomic Energy Research Institute undertook the project as the second phase of the six year program for dismantling the JPDR at the Tokai Research Establishment. It is the demonstration of the technology developed in the first phase of the program from 1981 to 1986, aiming at establishing a total system for dismantling commercial nuclear power plants in the furture. At the ceremony for the beginning of dismantling held on December 4 at the site, a special switch was operated to fire a gas burner, and cutting of the upper head of the reactor pressure vessel on the service floor of the reactor building began. The long term program on the development and utilization of nuclear energy in 1982 decided the basic policy on reactor decommissioning. Under this policy, in July, 1984, the nuclear subcommittee of the Advisory Committee for Energy set up the guideline for standardized decommissioning suitable to the actual situation in Japan. The schedule of the program, the development of eight fundamental techniques, disassembling techniques, decontamination, measurement and robotics are described. (Kako, I.).

  11. Technicians dismantle the inner section of L3

    CERN Multimedia

    Laurent Guiraud

    2001-01-01

    The technicians are dismantling the forward tracking chamber located at the heart of the L3 detector. This formed part of the hadronic calorimeter, which is used for measuring particle energies. L3 was an experiment at the LEP collider that ran from 1989 to 2000.

  12. Dismantling the silicon microstrip detector on L3

    CERN Multimedia

    Laurent Guiraud

    2001-01-01

    The silicon microstrip detector is located at the heart of the detector and must be kept cool to prevent thermal noise. The work shown here is the removal of the cooling system. L3 was dismantled as part of the closure of the entire LEP accelerator in 2000 to make way for the new LHC.

  13. Chemical Decontamination of Metallic Waste from Uranium Conversion Plant Dismantling

    International Nuclear Information System (INIS)

    Hwang, D. S.; Choi, Y. D.; Hwang, S. T.; Park, J. H.; Byun, J. I.; Jang, N. S.

    2005-01-01

    Korea Atomic Energy Research Institute (KAERI) started a decommissioning program of the uranium conversion plant. Pre-work was carried as follows; installation of the access control facility, installation of a changing room and shower room, designation of an emergency exit way and indicating signs, installation of a radiation management facility, preparation of a storage area for tools and equipments, inspection and load test of crane, distribution and packaging of existing waste, and pre-decontamination of the equipment surface and the interior. First, decommissioning work was performed in kiln room, which will be used for temporary radioactive waste storage room. Kiln room housed hydro fluorination rotary kiln for production of uranium tetra-fluoride. The kiln is about 0.8 m in diameter and 5.5 m long. The total dismantled waste was 6,690 kg, 73 % of which was metallic waste and 27 % the others such as cable, asbestos, concrete, secondary waste, etc. And effluent treatment room and filtration room were dismantled for installation of decontamination equipment and lagoon sludge treatment equipment. There were tanks and square mixer in these rooms. The total dismantled waste was 17,250 kg, 67% of which was metallic waste and 33% the others. These dismantled metallic wastes consist of stainless and carbon steel. In this paper, the stainless steel plate and pipe were decontaminated by the chemical decontamination with ultrasonic

  14. Decontamination and dismantling of large plutonium-contamined glove boxes

    International Nuclear Information System (INIS)

    Draulans, J.

    1991-01-01

    This report describes the work performed in the frame of two C.E.C. - Contracts FI1D-002400-B Decommissioning of very large glove boxes and FI1D-0058 Decommissioning of a complex glove box structure to be dismounted partially on place. Detailed information is given about each glove box. The selection of the solution Transportation of the glove boxes to a specialized dismantling plant is justified. The necessary contacts inside the BELGONUCLEAIRE MOX plant and between the latter and other organizations are explained. The problems of manipulating large gloves are listed and the retained solution of building a so called Stiffening frame around each glove box is described. Furthermore information is given concerning required operators time for cleaning, manipulating, packing and dismantling together with received doses and quantities of waste produced. Concerning the glove box unit partially to be dismounted on place, detailed information is given about the way the glove boxes have been treated prior to this partial dismantling on place and about the way this partial dismantling has been performed. From these results one can conclude that such a delicate task can be performed without major difficulties. Finally information is given of the decontamination test of a highly Pu contaminated glove box with freon with rather poor results and of the preliminary CO 2 blasting tests on non active samples

  15. Development and validation of a dissolution test for diltiazem hydrochloride in immediate release capsules

    Directory of Open Access Journals (Sweden)

    Taciane Ferreira Mendonça

    2011-01-01

    Full Text Available This work describes the development and validation of a dissolution test for 60 mg of diltiazem hydrochloride in immediate release capsules. The best dissolution in vitro profile was achieved using potassium phosphate buffer at pH 6.8 as the dissolution medium and paddle as the apparatus at 50 rpm. The drug concentrations in the dissolution media were determined by UV spectrophotometry and HPLC and a statistical analysis revealed that there were significant differences between HPLC and spectrophotometry. This study illustrates the importance of an official method for the dissolution test, since there is no official monograph for diltiazem hydrochloride in capsules.

  16. Dismantling and decommissioning of Jose Cabrera nuclear power plant

    International Nuclear Information System (INIS)

    Rodriguez, A.

    2009-01-01

    With the start of the dismantling works at the Jose Cabrera nuclear power plant now in sight, this is an appropriate moment to look back and consider recent history. The first time that the issue of nuclear power plant dismantling was dealt with was in 1975, at a conference in Paris entitled Nuclear Energy Maturity. Up until then the entire question had been one of design, construction and operation, but since that moment and it has been quite a while since that conference dismantling has begun to be seen as just another activity in the nuclear cycle, a final activity that will sooner or later affect all the facilities, an activity different from its predecessors and with the ultimate objective of restoring the sites for whatever use might be determined. During the 1960s and 1970s, the construction of nuclear power plants was widespread across the entire world. It was the baby boom of nuclear energy and now, forty or fifty years later, we are seeing the arrival of the end of the service lifetime of these plants and are faced with the corresponding general process of dismantling these installations. The dismantling of nuclear power plants has ceased to be an emerging issue and is now consolidated as a regular activity in the nuclear industry, albeit an activity that lacks adequate financing or specific regulation in certain countries. Fortunately this is not the case in Spain, since economic provisions have been planned and the regulatory framework developed. In view of the above, the dismantling of the nuclear power plants is an industrial activity involving specific technologies that implies new professional and business opportunities that should be absorbed and seized by society. In Spain the path followed in this direction has been a long one, as is underlined by the experiences of dismantling the Argos (Barcelona, 1998- 2004) and Arbi (Bilbao, 2002-2005) research reactors, the Andujar Uranium Mill (Jaen, 1991-1995), the Vandellos I nuclear power plant

  17. Waste management concept during dismantling of KKS NPP in Germany

    International Nuclear Information System (INIS)

    Bacmeister, Georg U.

    2008-01-01

    Full text: This paper gives an overview on the waste management of NPP Stade during dismantling. The general idea is to reduce the radioactive waste to about three percentage of the complete dismantling mass. The NPP Stade in Germany was shut down in November 2003. After a transient phase the license for dismantling was given in 2005. In the following 8 years about 20.000 tones of steel and 120.000 tones of concrete will be put out by the dismantling. The yearly output of steel will by about 100 times higher than during the running time of the NNP. For this a new processes for waste management had to be installed. The waste management during dismantling focus on free release (about 97%). Beside some minor exception, the rest is deemed to be radioactive waste. This will be collected in 1000 packages, which are ready to be sent to a final storage. As until now in Germany no final storage is open (and sending of radioactive waste to another country is forbidden), the NNP Stade build an intermediate storage, where the packages may by saved for longest 40 years. The clearance procedure in Germany is regulated in the radiation protection ordinances. It is based on a nuclide specific set of clearance levels. To fulfil these demands the NNP Stade chose a semi automated system for characterization and documentation, which we develop in accordance to our release license. It guaranties a most accurate determination of the relevant nuclides for a set of dismantling material (some 10 to 100 tones). After the characterization only the gamma-activity of the material is measured in boxes of about 500 kg. A short comparison of the chosen procedure with other options, possible in Germany will be given and the decision from the collaboration with the NPP in Barsebaeck, Sweden, will be withdrawn. Beside the free release different options are used for waste management, like incineration, sending to landfill or reuse in nuclear industry. The waste management of the NNP Stade take

  18. Equilibrium ignition for ICF capsules

    International Nuclear Information System (INIS)

    Lackner, K.S.; Colgate, S.A.; Johnson, N.L.; Kirkpatrick, R.C.; Menikoff, R.; Petschek, A.G.

    1993-01-01

    There are two fundamentally different approaches to igniting DT fuel in an ICF capsule which can be described as equilibrium and hot spot ignition. In both cases, a capsule which can be thought of as a pusher containing the DT fuel is imploded until the fuel reaches ignition conditions. In comparing high-gain ICF targets using cryogenic DT for a pusher with equilibrium ignition targets using high-Z pushers which contain the radiation. The authors point to the intrinsic advantages of the latter. Equilibrium or volume ignition sacrifices high gain for lower losses, lower ignition temperature, lower implosion velocity and lower sensitivity of the more robust capsule to small fluctuations and asymmetries in the drive system. The reduction in gain is about a factor of 2.5, which is small enough to make the more robust equilibrium ignition an attractive alternative

  19. Endurance test for DUPIC capsule

    International Nuclear Information System (INIS)

    Chung, Heung June; Bae, K. K.; Lee, C. Y.; Park, J. M.; Ryu, J. S.

    1999-07-01

    This report presents the pressure drop, vibration and endurance test results for mini-plate fuel rig which were designed fabricately by KAERI. From the pressure drop test results, it is noted that the flow rate across the capsule corresponding to the pressure drop of 200 kPa is measured to be about 9.632 kg/sec. Vibration frequency for the capsule ranges from 14 to 18.5 Hz. RMS (Root Mean Square) displacement for the fuel rig is less than 14 μm, and the maximum displacement is less than 54 μm. Based on the endurance test results, the appreciable fretting wear for the DUPIC capsule was not detected. Oxidation on the support tube is observed, also tiny trace of wear between contact points observed. (author). 4 refs., 10 tabs., 45 figs

  20. Triggered Release from Polymer Capsules

    Energy Technology Data Exchange (ETDEWEB)

    Esser-Kahn, Aaron P. [Univ. of Illinois, Urbana, IL (United States). Beckman Inst. for Advanced Science and Technology and Dept. of Chemistry; Odom, Susan A. [Univ. of Illinois, Urbana, IL (United States). Beckman Inst. for Advanced Science and Technology and Dept. of Chemistry; Sottos, Nancy R. [Univ. of Illinois, Urbana, IL (United States). Beckman Inst. for Advanced Science and Technology and Dept. of Materials Science and Engineering; White, Scott R. [Univ. of Illinois, Urbana, IL (United States). Beckman Inst. for Advanced Science and Technology and Dept. of Aerospace Engineering; Moore, Jeffrey S. [Univ. of Illinois, Urbana, IL (United States). Beckman Inst. for Advanced Science and Technology and Dept. of Chemistry

    2011-07-06

    Stimuli-responsive capsules are of interest in drug delivery, fragrance release, food preservation, and self-healing materials. Many methods are used to trigger the release of encapsulated contents. Here we highlight mechanisms for the controlled release of encapsulated cargo that utilize chemical reactions occurring in solid polymeric shell walls. Triggering mechanisms responsible for covalent bond cleavage that result in the release of capsule contents include chemical, biological, light, thermal, magnetic, and electrical stimuli. We present methods for encapsulation and release, triggering methods, and mechanisms and conclude with our opinions on interesting obstacles for chemically induced activation with relevance for controlled release.

  1. The Japan Power Demonstration Reactor (JPDR) dismantling activities. Dismantling of the reactor enclosure and the auxiliary buildings

    International Nuclear Information System (INIS)

    Seiki, Yoshihiro; Kubo, Takashi.

    1996-01-01

    As the final stage of the JPDR decommissioning program, after the major components were removed from each building of JPDR, the dismantling activities proceeded to the decontamination of contaminated concrete surface and the final radiation survey of buildings. These activities were conducted to verify the developed techniques and the detailed procedures for decontamination, and to allow unrestricted use of the JPDR buildings. Following the decontamination of buildings, the dismantling of each building was started. Before dismantling the buildings, the radiation control designations were changed. The buildings that contaminated embedded pipes were changed from first-class radiation controlled areas to second-class radiation controlled areas. On the other hand, the buildings that had no contaminated pipes were changed to uncontrolled areas. A first-class radiation controlled area allows the use of unsealed sources ; thus, radioactive contamination may exist. A second-class radiation controlled area is one where only sealed sources are allowed. Significant quantities of data and experience were obtained during these activities. The practical procedures for decontamination, the final survey of radioactivity, and the dismantling work of buildings were described in this report. (author)

  2. Data analysis on work activities in dismantling of Japan Power Demonstration Reactor (JPDR). Contract research

    International Nuclear Information System (INIS)

    Shiraishi, Kunio; Sukegawa, Takenori; Yanagihara, Satoshi

    1998-03-01

    The safe dismantling of a retired nuclear power plant was demonstrated by completion of dismantling activities for the Japan Power Demonstration Reactor (JPDR), March, 1996, which had been conducted since 1986. This project was a flag ship project for dismantling of nuclear power plants in Japan, aiming at demonstrating an applicability of developed dismantling techniques in actual dismantling work, developing database on work activities as well as dismantling of components and structures. Various data on dismantling activities were therefore systematically collected and these were accumulated on computer files to build the decommissioning database; dismantling activities were characterized by analyzing the data. The data analysis resulted in producing general forms such as unit activity factors, for example, manpower need per unit weight of component to be dismantled, and simple arithmetic forms for forecasting of project management data to be applied to planning another dismantling project through the evaluation for general use of the analyzed data. The results of data analysis could be usefully applied to planning of future decommissioning of commercial nuclear power plants in Japan. This report describes the data collection and analysis on the JPDR dismantling activities. (author)

  3. PREPARATION, CHARACTERIZATION AND PHARMACEUTICAL APPLICATION OF LINEAR DEXTRINS .4. DRUG-RELEASE FROM CAPSULES AND TABLETS CONTAINING AMYLODEXTRIN

    NARCIS (Netherlands)

    WIERIK, GHPT; EISSENS, AC; LERK, CF

    1993-01-01

    Linear dextrin (amylodextrin) and its soluble fraction were investigated for their suitability to enhance diazepam release from capsules and tablets. Drug release was analyzed in the USP XXI paddle apparatus and performed in phosphate buffer pH 6.8, with and without alpha-amylase, and in 0.1 N HCl

  4. Multipactor discharge apparatus

    International Nuclear Information System (INIS)

    1976-01-01

    The invention deals with a multipactor discharge apparatus which can be used for tuning microwave organs such as magnetron oscillators and other cavity resonators. This apparatus is suitable for delivering an improved tuning effect in a resonation organ wherefrom the working frequency must be set. This apparatus is equipped with two multipactor discharge electrodes set in a configuration such to that a net current flows from one electrode to another. These electrodes are parallel and flat. The apparatus can be used in magnetron devices as well for continuous waves as for impulses

  5. Radiative Gasification Apparatus

    Data.gov (United States)

    Federal Laboratory Consortium — This apparatus, developed at EL, determines gasification rate (mass loss rate) of a horizontally oriented specimen exposed in a nitrogen environment to a controlled...

  6. Robotic dismantlement systems at the CP-5 reactor D and D project

    International Nuclear Information System (INIS)

    Seifert, L. S.

    1998-01-01

    The Chicago Pile 5 (CP-5) Research Reactor Facility is currently undergoing decontamination and decommissioning (D and D) at the Argonne National Laboratory (ANL) Illinois site. CP-5 was the principle nuclear reactor used to produce neutrons for scientific research at Argonne from 1954 to 1979. The CP-5 reactor was a heavy-water cooled and moderated, enriched uranium-fueled reactor with a graphite reflector. The CP-5 D and D project includes the disassembly, segmentation and removal of all the radioactive components, equipment and structures associated with the CP-5 facility. The Department of Energy's Robotics Technology Development Program and the Federal Energy Technology Center, Morgantown Office provided teleoperated, remote systems for use in the dismantlement of the CP-5 reactor assembly for tasks requiring remote dismantlement as part of the EM-50 Large-Scale Demonstration Program (LSDP). The teleoperated systems provided were the Dual Arm Work Platform (DAWP), the Rosie Mobile Teleoperated Robot Work System (ROSIE), and a remotely-operated crane control system with installed swing-reduction control system. Another remotely operated apparatus, a Brokk BM250, was loaned to ANL by the Princeton Plasma Physics Laboratory (PPPL). This machine is not teleoperated and was not part of the LSDP, but deserves some mention in this discussion. The DAWP is a robotic dismantlement system that includes a pair of Schilling Robotic Systems Titan III hydraulic manipulator arms mounted to a specially designed support platform: a hydraulic power unit (HPU) and a remote operator console. The DAWP is designed to be crane-suspended for remote positioning. ROSIE, developed by RedZone Robotics, Inc. is a mobile, electro-hydraulic, omnidirectional platform with a heavy-duty telescoping boom mounted to the platform's deck. The work system includes the mobile platform (locomotor), a power distribution unit (PDU) and a remote operator console. ROSIE moves about the reactor building

  7. In vitro evaluation of extemporaneously compounded slow-release capsules containing morphine sulfate or oxycodone hydrochloride.

    Science.gov (United States)

    Glowiak, Dana L; Green, Julie L; Bowman, Bill J

    2005-01-01

    The in vitro performance of extemporaneously compounded morphine sulfate and oxycodone hydrochloride slow-release capsules was evaluated. Capsules containing varying amoutns of morphine sulfate (15, 60, 200 mg) or oxycodone hydrochloride (10, 80, 200 mg) were prepared and provided by a Phoenix, Arizona, pharmacy. The capsules also contained 40% Methocel E4M Premium to slow the release of their active ingredient and sufficient lactose to fill the capsules. Three batches of each capsule strength were prepared, and replicates from each batch were evlauated using United Stated Pharmacopeia dissolution apparatus II. Samples were taken at regular time intervals over 24 hours. After 1 hour the pH of the dissolution medium was adjusted form 1.2 to 4.0, and after 2 hours the pH was adjusted to 6.8. The amount of drug released at each time point was determined spectrophotometrically. The compounded capsules released 14% to 23%, 67% to 85% and 93% to 98% of their active ingredient after 0.5, 4 and 12 hours, respectively. The relative standard deviations between the replicates from each batch were less than 10% for most time points. The percent of drug released over the first 4 hours was linear (r squared = 0.9409-0.9999) when plotted versus time 1/2, indicating adherence to the simplified Higuchi model. Statistical analysis of the Higuchi dissolution constants indicated a significant difference (P less than 0.05) between batch No.3 and the other two batches of 200-mg oxycodone hydrochloride capsules. There was also a statistical difference between most of the Higuchi dissolution constants for the different-strength slow-release capsules and most slow-release capsules and equivalent strength controlled-release manufactured tablets (P less than 0.05). Using 40% Methocel E4M Premium slowed the release of morphine sulfate and oxycodone hydrochloride from extemporaneously compounded capsules. The in vitro performance of the slow-release capsules showed little intrabatch variation

  8. LEP Dismantling - a first Step into New Era

    CERN Multimedia

    2000-01-01

    The aim of the project is to remove the LEP machine and most of the services from the underground areas in order to install the LHC within the time constraints of its civil engineering and installation programmes The dismantling of LEP will be the first project to be executed under the new INB (Installation Nucléaire de Base) convention for the LHC. This talk will give an overview of the LEP Dismantling project covering traceability, planning, infrastructure and execution. It will explain what it means for our accelerators to be classified as INB's and will introduce the changes in working and safety procedures, which will be enforced from the beginning of October. Note: The presentation will be made in French with the transparencies in English.

  9. Long range manipulator development and experiments with dismantling tools

    International Nuclear Information System (INIS)

    Mueller, K.

    1993-01-01

    An existing handling system (EMIR) was used as a carrier system for various tools for concrete dismantling and radiation protection monitoring. It combined the advantages of long reach and high payload with highly dexterous kinematics. This system was enhanced mechanically to allow the use of different tools. Tool attachment devices for automatic tool exchange were investigated as well as interfaces (electric, hydraulic, compressed air, cooling water and signals). The control system was improved with regard to accuracy and sensor data processing. Programmable logic controller functions for tool control were incorporated. A free field mockup of the EMIR was build that allowed close simulation of dismantling scenarios without radioactive inventory. Aged concrete was provided for the integration tests. The development scheduled included the basic concept investigation; the development of tools and sensors; the EMIR hardware enhancement including a tool exchange; the adaption of tools and mockup and the final evaluation of the system during experiments

  10. Towards a more professional demolition and dismantling industry

    International Nuclear Information System (INIS)

    1988-01-01

    The work of the National Economic Development Office Demolition and Dismantling Group in four areas which are crucial to the economic performance of the demolition and dismantling industry and its safety record is considered. The first concerns the availability and accessibility of information about unconventional structures and details are given of the sort of information often kept for different types of structure. Secondly, the need is stressed for guidelines for the client, particularly on the risks involved and the choice of a competent contractor. Thirdly, basic credentials which it is important for contractors to set out in order to establish a good reputation for the industry are set out. Finally, the particular case of nuclear power station decommissioning is considered with reference to the size of the market, the pioneering knowledge to be gained from the decommissioning of the Windscale Advanced Gas-cooled Reactor, private sector involvement and the special techniques required. (U.K.)

  11. Health physics aspects of the Yale Heavy Ion Linear Accelerator dismantling project

    International Nuclear Information System (INIS)

    Price, K.W.; Holeman, G.R.

    1976-01-01

    A program for the disassembly of the Yale Heavy Ion Linear Accelerator was initiated January 1, 1975. The object of the disassembly was to render the accelerator complex free of radioactive contamination in order that the area may be used for other University purposes. In addition, any salvage of metal parts was a desirable goal of the dismantling procedure. A systematic removal of all contaminated material began immediately. Portable survey instruments, swipe surveys, and sodium iodide gamma ray spectra were used as indicators of contamination. Apparatus in the direct beam line seemed to pose the most significant hazard to personnel. As beam components were eliminated, radioactive contamination was significantly reduced. Certain accelerator parts had to be machined in order to salvage non-contaminated metal, and the health physics aspects of this procedure are described. Isotopes found in the surveys included 22 Na, 54 Mn, 60 Co, 65 Zn and 75 Se, which were predominately beam activation products of accelerator components. Final surveys indicated the area free of radioactive contamination

  12. Process Concepts for Semi-automatic Dismantling of LCD Televisions

    OpenAIRE

    Elo, Kristofer; Sundin, Erik

    2014-01-01

    There is a large variety of electrical and electronic equipment products, for example liquid crystal display television sets (LCD TVs), in the waste stream today. Many LCD TVs contain mercury, which is a challenge to treat at the recycling plants. Two current used processes to recycle LCD TVs are automated shredding and manual disassembly. This paper aims to present concepts for semi-automated dismantling processes for LCD TVs in order to achieve higher productivity and flexibility, and in tu...

  13. Development of a handling technology for underwater inspection and dismantling

    International Nuclear Information System (INIS)

    Rose, N.

    1994-01-01

    For the purpose of underwater inspection and dismantling of nuclear facilities, a prototype of a freely submersible, remote-controlled handling system was developed and tested under laboratory conditions. Particular interest was taken in the specific boundary conditions of the area of application and the methodological concept. The system was developed in three phases; in each phase, a prototype was constructed and tested. (orig.) [de

  14. Decontamination and dismantlement of Plant 7 at Fernald

    International Nuclear Information System (INIS)

    Albertin, M.; Borgman, T.; Zebick, B.

    1994-01-01

    Decontamination and dismantlement (D ampersand D) tasks have been successfully completed on Plant 7 at the Fernald Environmental Management Project. The seven story facility was radiologically, chemically, and biologically contaminated. The work involved the D ampersand D work beginning with safe shutdown and gross decontamination, and ended with removal of the structural steel. A series of lessons learned were gained which include use of explosives, bidding tactics, safe shutdown, building decontamination and lockdown, use of seam climbers, etc

  15. Dismantling of the rooms 82 to 100 at Marcoule

    International Nuclear Information System (INIS)

    Fiol, A.

    1988-01-01

    The dismantling of the rooms 82 to 100 at Marcoule is up to now, the most important decommissioning operation. The COGEMA Marcoule had the responsibility of studying and organizing the operation. On the works site the work was performed by STMI. The construction of a complete nuclear waste processing system was necessary, to protect against Pu contamination. Moreover, the efficiency of the work, was improved by the development and use of large special cutting tools [fr

  16. Apparatus for Teaching Physics.

    Science.gov (United States)

    Gottlieb, Herbert H., Ed.

    1981-01-01

    Describes: (1) a variable inductor suitable for an inductance-capacitance bridge consisting of a fixed cylindrical solenoid and a moveable solenoid; (2) long-range apparatus for demonstrating falling bodies; and (3) an apparatus using two lasers to demonstrate ray optics. (SK)

  17. Pipework inspection apparatus

    International Nuclear Information System (INIS)

    Wrigglesworth, K.J.; Knowles, J.F.

    1987-01-01

    The patent concerns a pipework inspection apparatus, which is capable of negotiating bends in pipework. The apparatus comprises a TV camera system, which contains an optical section and an electronics section, which are connected by a flexible coupling. The system can be pulled or pushed along the bore of the pipework. (U.K.)

  18. Nuclear core baffling apparatus

    International Nuclear Information System (INIS)

    Cooper, F.W. Jr.; Silverblatt, B.L.; Knight, C.B.; Berringer, R.T.

    1979-01-01

    An apparatus for baffling the flow of reactor coolant fluid into and about the core of a nuclear reactor is described. The apparatus includes a plurality of longitudinally aligned baffle plates with mating surfaces that allow longitudinal growth with temperature increases while alleviating both leakage through the aligned plates and stresses on the components supporting the plates

  19. Fractionation and rectification apparatus

    Energy Technology Data Exchange (ETDEWEB)

    Sauerwald, A

    1932-05-25

    Fractionation and rectifying apparatus with a distillation vessel and a stirring tube, drainage tubes leading from its coils to a central collecting tube, the drainage tubes being somewhat parallel and attached to the outer half of the stirring tube and partly on the inner half of the central collecting tube, whereby distillation and rectification can be effected in a single apparatus.

  20. Capsule safety analysis of PRTF irradiation facility

    International Nuclear Information System (INIS)

    Suwarto

    2013-01-01

    Power Ramp Test Facility (PRTF) is an irradiation facility used for fuel testing of power reactor. PRTF has a capsule which is a test fuel rod container. During operation, pressurized water of 160 bars flows through in the capsule. Due to the high pressure it should be analyzed the impact of the capsule on reactor core safety. This analysis has purpose to calculate the ability of capsule pressure capacity. The analysis was carried out by calculating pressure capacity. From the calculating results it can be concluded that the capsule with pressure capacity of 438 bars will be safe to prevent the operation pressure of PRTF. (author)

  1. Probing cell internalisation mechanics with polymer capsules.

    Science.gov (United States)

    Chen, Xi; Cui, Jiwei; Ping, Yuan; Suma, Tomoya; Cavalieri, Francesca; Besford, Quinn A; Chen, George; Braunger, Julia A; Caruso, Frank

    2016-10-06

    We report polymer capsule-based probes for quantifying the pressure exerted by cells during capsule internalisation (P in ). Poly(methacrylic acid) (PMA) capsules with tuneable mechanical properties were fabricated through layer-by-layer assembly. The P in was quantified by correlating the cell-induced deformation with the ex situ osmotically induced deformation of the polymer capsules. Ultimately, we found that human monocyte-derived macrophage THP-1 cells exerted up to approximately 360 kPa on the capsules during internalisation.

  2. Contaminated Metal Components in Dismantling by Hot Cutting Processes

    International Nuclear Information System (INIS)

    Cesari, Franco G.; Conforti, Gianmario; Rogante, Massimo; Giostri, Angelo

    2006-01-01

    During the preparatory dismantling activities of Caorso's Nuclear Power Plant (NPP), an experimental campaign using plasma and oxyacetylene metal cutting processes has been performed and applied to plates and tubes exposed to the coolant steam of the reactor. The plant (Boiling Water Reactor, 870 MWe) was designed and built in the 70's, and it was fully operating by 1981 to 1986 being shut down after 1987 Italy's poll that abrogated nuclear power based on U235 fission. The campaign concerns no activated materials, even if the analyses have been performed of by use contaminated components under the free release level, not yet taking into account radioactivity. In this paper, the parameters related to inhalable aerosol, solid and volatile residuals production have been, studied during hot processes which applies the same characteristics of the cutting in field for the dismantling programs of Caorso NPP. The technical parameters such as cutting time and cutting rate vs. pipe diameter/thickness/schedule or plate thickness for ferritic alloys and the emissions composition coming from the sectioning are also reported. The results underline the sort of trouble that can emerge in the cutting processes, in particular focusing on the effects comparison between the two cutting processes and the chemical composition of powders captured by filtering the gaseous emission. Some preliminary considerations on methodology to be used during the dismantling have been presented. (authors)

  3. Dismantling of the 50 MW steam generator test facility

    International Nuclear Information System (INIS)

    Nakai, S.; Onojima, T.; Yamamoto, S.; Akai, M.; Isozaki, T.; Gunji, M.; Yatabe, T.

    1997-01-01

    We have been dismantling the 50MW Steam Generator Test Facility (50MWSGTF). The objectives of the dismantling are reuse of sodium components to a planned large scale thermal hydraulics sodium test facility and the material examination of component that have been operated for long time in sodium. The facility consisted of primary sodium loop with sodium heater by gas burner as heat source instead of reactor, secondary sodium loop with auxiliary cooling system (ACS) and water/steam system with steam temperature and pressure reducer instead of turbine. It simulated the 1 loop of the Monju cooling system. The rated power of the facility was 50MWt and it was about 1/5 of the Monju power plant. Several sodium removal methods are applied. As for the components to be dismantled such as piping, intermediate heat exchanger (IHX), air cooled heat exchangers (AC), sodium is removed by steam with nitrogen gas in the air or sodium is burned in the air. As for steam generators which material tests are planned, sodium is removed by steam injection with nitrogen gas to the steam generator. The steam generator vessel is filled with nitrogen and no air in the steam generator during sodium removal. As for sodium pumps, pump internal structure is pulled out from the casing and installed into the tank. After the installation, sodium is removed by the same method of steam generator. As for relatively small reuse components such as sodium valves, electromagnet flow meters (EMFs) etc., sodium is removed by alcohol process. (author)

  4. Dismantlement and destruction of chemical, nuclear and conventional weapons

    International Nuclear Information System (INIS)

    Schulte, N.T.

    1997-01-01

    The safe destruction and dismantling of chemical, nuclear and conventional weapons is of fundamental importance to the security of all countries represented in this volume. Expertise in the field is not confined to one country or organisation: all can benefit from each other. There is an ever present danger of proliferation of weapons of mass destruction: approximately two dozen countries have ongoing programmes to develop or acquire such weapons, and many are also gaining the capability to build air-surface delivery systems. But much can be done to prevent proliferation by reducing leakage of materials and know-how and by solving the problems of the destruction of surplus weapons systems, which has now come to be a key issue. In 13 sessions of the workshop attention was paid to (1) Dismantlement and Destruction of Chemical, Nuclear and Conventional Weapons; (2) Status of Implementation of Arms Control Treaties and Voluntary Commitments; (3) National Perspectives on Cooperation in Disarmament; (4) Stocktaking of National and Bilateral Disposal/Destruction Programmes: Chemical Weapons; (5) Stocktaking of National and Bilateral Disposal/Destruction Programmes: Nuclear Weapons; (6) Stocktaking of National and Bilateral Disposal/Destruction Programmes: Conventional Weapons. Session; (7) Experience with Currently Employed Chemical Destruction Technologies; (8) Alternative Chemical Destruction Technologies; (9) Deactivation, Dismantlement and Destruction of Delivery Systems and Infrastructure for Nuclear Weapons; (10) Storage, Safeguarding and Disposition of Fissile Materials; (11) Technologies for Conversion and Civil Use of Demilitarized Materials; (12) International Organizations; and (13) Environmental Challenges Posed by Chemical and Nuclear Disarmament

  5. A Study on Dismantling and Verifying North Korea's Nuclear Capabilities

    International Nuclear Information System (INIS)

    Kim, Young Jae; Cheon, Seong Whun

    2007-10-01

    North Korea's nuclear weapon development is a serious threat to South Korea's national security and can become a trigger to change the status quo in the Korean peninsula. Having prevailed security dynamics in Northeast Asia last 20 years, the North Korea's nuclear problem faced a key turning point when Pyongyang tested its first nuclear weapon on October 9, 2006. Despite this test, however, diplomatic efforts to resolve the nuclear issue were never given up, resulting in a so-called, initial agreement signed at the Six-Party Talks in February 2007. With the Six-Party Talks being held more than four years, the six countries have had sufficient time to discuss principal and political matters regarding the dismantlement of North Korea's nuclear weapons. Under the circumstances, this report is going to study practical and detail issues related with dismantling the North's nuclear weapons. Specifically, in light of historical experiences, the report will investigate possible problems to be faced in the course of dismantlement and propose policy measures to overcome these problems

  6. Dismantling and decontamination of Piver prototype vitrification plant

    International Nuclear Information System (INIS)

    Jouan, A.; Roudil, S.; Thomas, F.

    1991-01-01

    The PIVER prototype was targeted for dismantling in order to install a new pilot facility for the french continuous vitrification process. Most of the work involved the vitrification cell containing the process equipments, which had to be cleared out and thoroughly decontaminated; this implied disassembling, cutting up, conditioning and removing all the equipment installed in the cell. Remote manipulation, handling and cutting devices were used and some prior modifications were implemented in the cell environment. The dismantling procedure was conducted under a detailed programme defining the methodology for each operation. After equipment items and active zones were identified, the waste materials were removed, and several liquid decontamination operations were implemented. Removed activity, levels of irradiation in the cell and doses integrated by personnel were monitored to control progress and to adapt procedures to the conditions encountered. At the end of December 1989, the PIVER cleanup programme was at 87% complete and the total activity removed was 2.11 X 10 14 Bq (5712 Ci). The objective now is to obtain suitable working conditions in order to allow operators to enter the cell to remove items that are inaccessible or which cannot be dismantled by remote manipulators and to complete the decontamination procedure

  7. Development of decommissioning engineering support system for fugen. Development of support system during actual dismantlement works

    International Nuclear Information System (INIS)

    Masanori Izumi; Yukihiro Iguchi; Yoshiki Kannehira

    2005-01-01

    The Advanced Thermal Reactor, Fugen Nuclear Power Station was permanently shut down in March 2003, and is now preparing for decommissioning. We have been developing Decommissioning Engineering Support System (DEXUS) aimed at planning optimal dismantlement process and carrying out dismantlement work safely and precisely. DEXUS consists of 'decommissioning planning support system' and 'dismantling support system'. The dismantling support system is developed aiming at using during actual dismantling work. It consists of three subsystems such as 'Worksite Visualization System', 'Dismantling Data Collection System' and 'Generated Waste Management System'. 'Worksite Visualization System' is a support system designed to provide the necessary information to workers during actual dismantlement works. And this system adopts AR (Augmented Reality) technology, overlapping calculation information into real world. 'Dismantling Data Collection System' is to collect necessary data for improving accuracy of decommissioning planning by evaluating work content and worker equipage, work time for dismantlement works. 'Generated Waste Management system' is a system recording necessary information by attaching the barcode to dismantled wastes or the containers. We can get the information of generated waste by recording generation place, generated time, treatment method and the contents. These subsystems enable to carry out reasonable and safe decommissioning of Fugen. In addition, we expect that those systems will be used for decommissioning of other nuclear facilities in the future. (authors)

  8. Contraindications for video capsule endoscopy

    OpenAIRE

    Bandorski, Dirk; Kurniawan, Niehls; Baltes, Peter; Hoeltgen, Reinhard; Hecker, Matthias; Stunder, Dominik; Keuchel, Martin

    2016-01-01

    Video capsule endoscopy (VCE) has been applied in the last 15 years in an increasing field of applications. Although many contraindications have been put into perspective, some precautions still have to be considered. Known stenosis of the gastrointestinal tract is a clear contraindication for VCE unless surgery is already scheduled or at least has been considered as an optional treatment modality. In patients with a higher incidence of stenosis, as in an established diagnosis of Crohn?s dise...

  9. Towards the creation of an industrial sector dedicated to nuclear dismantling

    International Nuclear Information System (INIS)

    Anon.

    2015-01-01

    In next decades the business of nuclear dismantling is expected to grow exponentially due to the decommissioning of nuclear facilities that will have reached the end of their operating life. Dismantling has 2 main features: dismantling operations on a same site can span decades and dismantling is a new activity in which innovations are likely to appear and may benefit other sectors. In France regional authorities have promoted public-private partnerships in order to make working together small enterprises very specialized in sectors like robotic, laser cutting, waste processing, remote operations... with public laboratories dedicated to nuclear research, and with graduate schools to include dismantling in curriculum and with major industrial operators of the nuclear industry. The aim is the creation of jobs and the building of an industrial sector able to win market shares in the worldwide business of nuclear dismantling. (A.C.)

  10. CASTING METHOD AND APPARATUS

    Science.gov (United States)

    Gray, C.F.; Thompson, R.H.

    1958-10-01

    An improved apparatus for the melting and casting of uranium is described. A vacuum chamber is positioned over the casting mold and connected thereto, and a rod to pierce the oxide skin of the molten uranium is fitted into the bottom of the melting chamber. The entire apparatus is surrounded by a jacket, and operations are conducted under a vacuum. The improvement in this apparatus lies in the fact that the top of the melting chamber is fitted with a plunger which allows squeezing of the oxide skin to force out any molten uranium remaining after the skin has been broken and the molten charge has been cast.

  11. Mirror plasma apparatus

    International Nuclear Information System (INIS)

    Moir, R.W.

    1981-01-01

    A mirror plasma apparatus which utilizes shielding by arc discharge to form a blanket plasma and lithium walls to reduce neutron damage to the wall of the apparatus. An embodiment involves a rotating liquid lithium blanket for a tandem mirror plasma apparatus wherein the first wall of the central mirror cell is made of liquid lithium which is spun with angular velocity great enough to keep the liquid lithium against the first material wall, a blanket plasma preventing the lithium vapor from contaminating the plasma

  12. Conduit grinding apparatus

    Science.gov (United States)

    Nachbar, Henry D.; Korytkowski, Alfred S.

    1991-01-01

    A grinding apparatus for grinding the interior portion of a valve stem receiving area of a valve. The apparatus comprises a faceplate, a plurality of cams mounted to an interior face of the faceplate, a locking bolt to lock the faceplate at a predetermined position on the valve, a movable grinder and a guide tube for positioning an optical viewer proximate the area to be grinded. The apparatus can either be rotated about the valve for grinding an area of the inner diameter of a valve stem receiving area or locked at a predetermined position to grind a specific point in the receiving area.

  13. Analysis of dismantling possibility and unloading efforts of fuel assemblies from core of WWER

    International Nuclear Information System (INIS)

    Danilov, V.; Dobrov, V.; Semishkin, V.; Vasilchenko, I.

    2006-01-01

    The computation methods of optimal dismantling sequence of fuel assemblies (FA) from core of WWER after different operating periods and accident conditions are considered. The algorithms of fuel dismantling sequence are constructed both on the basis of analysis of mutual spacer grid overlaps of adjacent fuel assemblies and numerical structure analysis of efforts required for FA removal as FA heaving from the core. Computation results for core dismantling sequence after 3-year operating period and LB LOCA are presented in the paper

  14. Status of the Digital Mock-up System for the dismantling of the nuclear facilities

    International Nuclear Information System (INIS)

    Park, Hee Seoung; Kim, S. K.; Lee, K. W.; Oh, W. J.

    2004-12-01

    The database system have already developed is impossible to solve a quantitative evaluation about a various situation from the dismantle activities of the reactor had contaminated with radioactivity. To satisfy the requirements for safety and economical efficiency among a major decommissioning technologies, it need a system that can evaluate and estimate dismantling scheduling, amount of radioactive waste being dismantled, and decommissioning cost. We have review and analyzed status of the digital mock-up system to get a technical guide because we have no experience establishment of one relation to dismantling of research reactor and nuclear power plant

  15. User Interface Technology to Reduce Mental Transformations for Tangible Remote Dismantling Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Hyun, Dongjun; Kim, Ikjune; Lee, Jonghwan; Kim, Geun-Ho; Jeong, Kwan-Seong; Choi, Byung-Seon; Moon, Jeikwon; Choi, Jong-Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    High-level radiation of the major components restricts access by human workers, and makes an accident or outage during the dismantling process more difficult to deal with. Since unexpected situations causes waste of budget and an aggravation of safety, the preliminary verification of the dismantling processes and equipment by the tangible remote dismantling simulator is very important. The design optimization of the dismantling processes and equipment is one of the most important objectives of the tangible remote dismantling simulator, as well. This paper proposes a user interface technology to reduce mental transformations for the tangible remote dismantling simulator. At the dismantling process simulation using the tangible remote dismantling simulator, the most difficult work is the remote operation handling the high degrees-of-freedom (DOF) manipulator due to complex mental transformations. The proposed user interface technology reduces mental transformations with constraints using the point projection and direction projection. The test result of the cutting process over the closure head of the RPV demonstrates that the proposed mental transformation reduction technology is operated successfully in the tangible remote dismantling simulator, and lets the operator be easy to control the high DOF manipulator even in the most difficult operation by reducing DOFs to be controlled manually.

  16. Development of project management data calculation models relating to dismantling of nuclear facilities. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Sukegawa, Takenori; Ohshima, Soichiro; Shiraishi, Kunio; Yanagihara, Satoshi [Department of Decommissioning and Waste Management, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai Ibaraki (Japan)

    1999-02-01

    Labor-hours necessary for dismantling activities are generally estimated based on experience, for example, as a form of unit productivity factors such as the relationship between labor-hours and weight of components dismantled which were obtained by actual dismantling activities. The project management data calculation models together with unit productivity factors for basic dismantling work activities were developed by analyzing the data obtained from the Japan Power Demonstration Reactor (JPDR) dismantling project, which will be applicable to estimation of labor-hours in various dismantling conditions. Typical work breakdown structures were also prepared by categorizing repeatable basic dismantling work activities for effective planning of dismantling activities. The labor-hours for dismantling the JPDR components and structures were calculated by using the code system for management of reactor decommissioning (COSMARD), in which the work breakdown structures and the calculation models were contained. It was confirmed that the labor-hours could be easily estimated by COSMARD through the calculations. This report describes the labor-hour calculation models and application of these models to COSMARD. (author)

  17. Reserves for shutdown/dismantling and disposal in nuclear technology. Theses and recommendations on reform options

    International Nuclear Information System (INIS)

    Meyer, Bettina

    2012-01-01

    The study on reserves for shutdown, dismantling and disposal of nuclear facilities covers the following topics: cost for shutdown, dismantling and disposal and amount and transparency of nuclear reserves, solution by y stock regulated by public law for long-term liabilities, and improvement of the protection in the event of insolvency for the remaining EVU reserves for short- and intermediate-term liabilities. The appendix includes estimations and empirical values for the cost of shutdown and dismantling, estimation of disposal costs, and a summary of Swiss studies on dismantling and disposal and transfer to Germany.

  18. User Interface Technology to Reduce Mental Transformations for Tangible Remote Dismantling Simulator

    International Nuclear Information System (INIS)

    Hyun, Dongjun; Kim, Ikjune; Lee, Jonghwan; Kim, Geun-Ho; Jeong, Kwan-Seong; Choi, Byung-Seon; Moon, Jeikwon; Choi, Jong-Won

    2015-01-01

    High-level radiation of the major components restricts access by human workers, and makes an accident or outage during the dismantling process more difficult to deal with. Since unexpected situations causes waste of budget and an aggravation of safety, the preliminary verification of the dismantling processes and equipment by the tangible remote dismantling simulator is very important. The design optimization of the dismantling processes and equipment is one of the most important objectives of the tangible remote dismantling simulator, as well. This paper proposes a user interface technology to reduce mental transformations for the tangible remote dismantling simulator. At the dismantling process simulation using the tangible remote dismantling simulator, the most difficult work is the remote operation handling the high degrees-of-freedom (DOF) manipulator due to complex mental transformations. The proposed user interface technology reduces mental transformations with constraints using the point projection and direction projection. The test result of the cutting process over the closure head of the RPV demonstrates that the proposed mental transformation reduction technology is operated successfully in the tangible remote dismantling simulator, and lets the operator be easy to control the high DOF manipulator even in the most difficult operation by reducing DOFs to be controlled manually

  19. Tomographic scanning apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    Details are given of a tomographic scanning apparatus, with particular reference to a multiplexer slip ring means for receiving output from the detectors and enabling interfeed to the image reconstruction station. (U.K.)

  20. Tomographic scanning apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    Details are presented of a tomographic scanning apparatus, its rotational assembly, and the control and circuit elements, with particular reference to the amplifier and multiplexing circuits enabling detector signal calibration. (U.K.)

  1. Tomographic scanning apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    This patent specification relates to a tomographic scanning apparatus using a fan beam and digital output signal, and particularly to the design of the gas-pressurized ionization detection system. (U.K.)

  2. Scintillation counting apparatus

    International Nuclear Information System (INIS)

    Noakes, J.E.

    1978-01-01

    Apparatus is described for the accurate measurement of radiation by means of scintillation counters and in particular for the liquid scintillation counting of both soft beta radiation and gamma radiation. Full constructional and operating details are given. (UK)

  3. Imaging Apparatus And Method

    NARCIS (Netherlands)

    Manohar, Srirang; van Leeuwen, A.G.J.M.

    2010-01-01

    A thermoacoustic imaging apparatus comprises an electromagnetic radiation source configured to irradiate a sample area and an acoustic signal detection probe arrangement for detecting acoustic signals. A radiation responsive acoustic signal generator is added outside the sample area. The detection

  4. IMAGING APPARATUS AND METHOD

    NARCIS (Netherlands)

    Manohar, Srirang; van Leeuwen, A.G.J.M.

    2008-01-01

    A thermoacoustic imaging apparatus comprises an electromagnetic radiation source configured to irradiate a sample area and an acoustic signal detection probe arrangement for detecting acoustic signals. A radiation responsive acoustic signal generator is added outside the sample area. The detection

  5. Thermal Acoustic Fatigue Apparatus

    Data.gov (United States)

    Federal Laboratory Consortium — The Thermal Acoustic Fatigue Apparatus (TAFA) is a progressive wave tube test facility that is used to test structures for dynamic response and sonic fatigue due to...

  6. Light shielding apparatus

    Science.gov (United States)

    Miller, Richard Dean; Thom, Robert Anthony

    2017-10-10

    A light shielding apparatus for blocking light from reaching an electronic device, the light shielding apparatus including left and right support assemblies, a cross member, and an opaque shroud. The support assemblies each include primary support structure, a mounting element for removably connecting the apparatus to the electronic device, and a support member depending from the primary support structure for retaining the apparatus in an upright orientation. The cross member couples the left and right support assemblies together and spaces them apart according to the size and shape of the electronic device. The shroud may be removably and adjustably connectable to the left and right support assemblies and configured to take a cylindrical dome shape so as to form a central space covered from above. The opaque shroud prevents light from entering the central space and contacting sensitive elements of the electronic device.

  7. Tomographic scanning apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    This patent specification describes a tomographic scanning apparatus, with particular reference to the adjustable fan beam and its collimator system, together with the facility for taking a conventional x-radiograph without moving the patient. (U.K.)

  8. Fuel pellet loading apparatus

    International Nuclear Information System (INIS)

    1980-01-01

    Apparatus is described for loading a predetermined amount of nuclear fuel pellets into nuclear fuel elements and particularly for the automatic loading of fuel pellets from within a sealed compartment. (author)

  9. Apparatus for drying sugar cubes

    NARCIS (Netherlands)

    Derckx, H.A.J.; Torringa, H.M.

    1999-01-01

    Device for drying sugar cubes containing a heating apparatus for heating and dehumidifying the sugar cubes, a conditioning apparatus for cooling off and possibly further dehumidifying the sugar cubes and a conveying apparatus for conveying the sugar cubes through the heating apparatus and the

  10. Test sample handling apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    A test sample handling apparatus using automatic scintillation counting for gamma detection, for use in such fields as radioimmunoassay, is described. The apparatus automatically and continuously counts large numbers of samples rapidly and efficiently by the simultaneous counting of two samples. By means of sequential ordering of non-sequential counting data, it is possible to obtain precisely ordered data while utilizing sample carrier holders having a minimum length. (U.K.)

  11. Radiation imaging apparatus

    International Nuclear Information System (INIS)

    1979-01-01

    This invention relates to a radiation imaging apparatus. It relates more particularly to apparatus of this general type which employs stationary X-ray source and detector arrays capable of acquiring multiple ultrafast scans per second to facilitate the dynamic study of moving human organs such as the beating heart. While the invention has many applications, it has particular utility in connection with computerized tomographic (CT) scanners. (Auth.)

  12. X-ray apparatus

    International Nuclear Information System (INIS)

    Tomita, Chuji.

    1980-01-01

    A principal object of the present invention is to provide an X-ray apparatus which is such that the distance between the surface of the patient's table and the floor on which the apparatus is installed is sufficiently small in the horizontal position of the patient's table of the roentgenographical pedestal and that the rotation of the pedestal from the horizontal position to a tilted position and further to the vertical position of the table can be carried out smoothly. (auth)

  13. Sludge recovery apparatus

    International Nuclear Information System (INIS)

    Marmo, A.R.

    1979-01-01

    An improved design of a sludge recovery apparatus used in the fabrication of nuclear fuel is described. This apparatus provides for automatic separation of sludge from the grinder coolant, drying of the sludge into a flowable powder and transfer of the dry powder to a salvage container. It can be constructed to comply with criticality-safe-geometry requirements and to obviate need for operating personnel in its immediate vicinity. (UK)

  14. Infrared microscope inspection apparatus

    Science.gov (United States)

    Forman, Steven E.; Caunt, James W.

    1985-02-26

    Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface.

  15. CRITICALITY CONTROL DURING THE DISMANTLING OF A URANIUM CONVERSION PLANT

    International Nuclear Information System (INIS)

    LADURELLE, Laurent; LISBONNE, Pierre

    2003-01-01

    Within the Commissariat a l'Energie Atomique, in the Cadarache Research Center in southern France, the production at the Enriched Uranium Treatment Workshops started in 1965 and ended in 1995. The dismantling is in progress and will last until 2006. The decommissioning is planned in 2007. Since the authorized enrichment in 235U was 10% in some parts of the plant, and unlimited in others, the equipment and procedures were designed for criticality control during the operating period. Despite the best previous removing of the uranium in the inner parts of the equipment, evaluation of the mass of remaining fissile material by in site gamma spectrometry measurement shows that the safety of the ''clean up'' operations requires specific criticality control procedures, this mass being higher than the safe mass. The chosen method is therefore based on the mapping of fissile material in the contaminated parts of the equipment and on the respect of particular rules set for meeting the criticality control standards through mass control. The process equipment is partitioned in separated campaign, and for each campaign the equipment dismantling is conducted with a precise traceability of the pieces, from the equipment to the drum of waste, and the best final evaluation of the mass of fissile material in the drum. The first results show that the mass of uranium found in the dismantled equipment is less than the previous evaluation, and they enable us to confirm that the criticality was safely controlled during the operations. The mass of fissile material remaining in the equipment can be then carefully calculated, when it is lower than the minimal critical mass, and on the basis of a safety analysis, we will be free of any constraints regarding criticality control, this allowing to make procedures easier, and to speed up the operations

  16. Recycling of concrete generated from Nuclear Power Plant dismantling

    International Nuclear Information System (INIS)

    Ogawa, Hideo; Nawa, Toyoharu; Ishikura, Takeshi; Tanaka, Hiroaki

    2013-01-01

    Reactor decommissioning required various technologies such as dismantling of facilities, decontamination, radioactivity measurement and recycling of dismantling wastes. This article discussed recycling of demolished concrete wastes. Dismantling of reactor building of large one unit of nuclear power plants would generate about 500 K tons of concrete wastes, about 98% of which was non-radioactive and could be used as base course material or backfill material after crushed to specified particle size. Since later part of 1990s, high quality recycled aggregate with specified limit of bone-dry density, water absorptivity and amount of fine aggregate had been developed from demolished concrete with 'Heat and rubbing method', 'Eccentric rotor method' and 'Screw grinding method' so as to separate cements attached to aggregate. Recycled aggregates were made from concrete debris with 'Jaw crusher' to particle size less than 40 mm and then particle size control or grinded by various grinding machines. Recycled fine aggregates made from crushing would have fragile site with cracks, air voids and bubbles. The author proposed quality improvement method to selectively separate fragile defects from recycled aggregates using weak grinding force, leaving attached pastes much and preventing fine particle generation as byproducts. This article outlined experiments to improve quality of recycled fine aggregates and their experimental results confirmed improvement of flow ability and compressive strength of mortal using recycled fine aggregates using 'Particle size selector' and 'Ball mill' so as to remove their fragile parts less than 2%. Mortal made from recycled fine aggregate could also prevent permeation of chloride ion. Recycled aggregate could be used for concrete instead of natural aggregate. (T. Tanaka)

  17. Stade. Decommissioning and dismantling of the nuclear power plant - from the nuclear power plant to the green lawn. 3. ed.

    International Nuclear Information System (INIS)

    2008-01-01

    The nuclear power plant Stade (KKS) was shutdown in 2003 and is being dismantled since 2005. The contribution covers the following issues: What means decommissioning and dismantling? What was the reason for decommissioning? What experiences on the dismantling of nuclear power plants are available? What is the dismantling procedure? What challenges for the power plant personal result from dismantling? What happens with the deconstruction material? What happens with the resulting free area (the ''green lawn'')? What is the legal frame work for dismantling?

  18. Foam decontamination of large nuclear components before dismantling

    International Nuclear Information System (INIS)

    Costes, J.R.; Sahut, C.

    1998-01-01

    Following some simple theoretical considerations, the authors show that foam compositions can be advantageously circulated them for a few hours in components requiring decontamination before dismantling. The technique is illustrated on six large ferritic steel valves, then on austenitic steel heat exchangers for which the Ce(III)/Ce(IV) redox pair was used to dissolve the chromium; Ce(III) was reoxidized by ozone injection into the foam vector gas. Biodegradable surfactants are sued in the process; tests have shown that the foaming power disappears after a few days, provided the final radioactive liquid waste is adjusted to neutral pH, allowing subsequent coprecipitation of concentration treatment. (author)

  19. Implementing robotics in the Department of Energy Dismantlement Program

    International Nuclear Information System (INIS)

    Jones, A.T.

    1997-01-01

    Since the end of the cold war, as our nuclear stockpile has decreased, the Department of Energy (DOE) has been working rapidly to safely dismantle weapons returned by the military. In order to be retired, weapons must be returned to the Pantex Plant in Amarillo, Texas. There they are reduced to their component parts. Although many of these parts are not hazardous, some, including certain explosive assemblies and radioactive materials, are sufficiently hazardous so that special handling systems are necessary. This paper will describe several of these systems developed by Sandia for Pantex and their technical basis

  20. Conception of dismantling cell for glove box with alpha contamination

    International Nuclear Information System (INIS)

    Mangin, D.

    1987-01-01

    The new dismantling cell of Valduc treats particularly alpha glove boxes. This cell is conceived to reduce the intervention inside for man with ventilated clothes and to reduce the volume of alpha wastes by utilization of manipulators and appropriate tools. The respect of low level norms (0.1 Ci/ton) for storage of alpha wastes conductes us to make a first decontamination, to ameliorate the detection in quantity of plutonium in the wastes and for wastes with a level upper the norm to make studies on decontamination by Freon 113 [fr

  1. Metal Radioactive Waste Recycling from the Dismantling of Nuclear Facilities

    International Nuclear Information System (INIS)

    Fajt, B.; Prah, M.

    1996-01-01

    In the dismantling process of nuclear power plants a large amount of metal residues are generated. The residues of interest are stainless steel, copper and aluminium and can be reprocessed either for restricted or unrestricted use. Although there are many questions about the further use of these materials it should be convenient to recycle them. This paper discusses the complexity of the management of these metals. The radiation protection requirements are the most important principles. For these purposes great efforts in the decontamination have to be made. Regulatory aspects, clearance levels as well as characteristic of steel recycling industry, radiological impact and new developments are discussed. (author)

  2. Cost effective decommissioning and dismantling of nuclear power plants

    International Nuclear Information System (INIS)

    Wasinger, Karl

    2012-01-01

    As for any large and complex project, the basis for cost effective decommissioning and dismantling of nuclear power plants is established with the development of the project. Just as its construction, dismantling of a nuclear power plant is similarly demanding. Daily changing situations due to the progress of construction - in the present case progress of dismantling - result in significant logistical challenges for project managers and site supervisors. This will be aggravated by the fact that a considerable amount of the removed parts are contaminated or even activated. Hence, not only occupational health, safety and environmental protection is to be assured, employees, public and environment are to be adequately protected against the adverse effect of radioactive radiation as well. Work progress and not least expenses involved with the undertaking depend on adherence to the planned course of actions. Probably the most frequent cause of deviation from originally planned durations and costs of a project are disruptions in the flow of work. For being enabled to counteract in a timely and efficient manner, all required activities are to be comprehensively captured with the initial planning. The effect initial activities may have on subsequent works until completion must particularly be investigated. This is the more important the larger and more complex the project actually are. Comprehensive knowledge of all the matters which may affect the progress of the works is required in order to set up a suitable work break-down structure; such work break-down structure being indispensable for successful control and monitoring of the project. In building the related organizational structure of the project, all such stakeholders not being direct part of the project team but which may potentially affect the progress of the project are to be considered as well. Cost effective and lost time injury free dismantling of decommissioned nuclear power plants is based on implementing

  3. Decommissioning and dismantling of the Rossendorf Isotope Production

    International Nuclear Information System (INIS)

    Grahnert, Thomas

    2016-01-01

    After just over 40 years of production operation 2000, the operation of the Rossendorf Isotope Production was finally stopped. In the last few years of production already sections of the Rossendorf Isotope Production have been decommissioned. With the end of the isotope production the decommissioning of the entire complex started. In the two-part report, the decommissioning and dismantling of the Rossendorf Isotope production is presented. In part 1 (atw 5/2016) mainly the authorisation procedures and the realised decommissioning concept are presented. Part 2 (atw 6/2016) deals with special selected aspects of the implementation of the decommissioning programme.

  4. Latest expertise investigations in nuclear dismantling and industrial applications

    International Nuclear Information System (INIS)

    Gallozzi Ulmann, Adrien; Chazalet, Julien; Couturier, Pierre; Touzain, Etienne; Amgarou, Khalil; Menaa, Nabil

    2013-06-01

    During the last decades, CANBERRA has developed know-how, expertise and intervention strategies based on its feedback experiences in many countries. This document covers a wide range of applications involving nuclear characterization, for which CANBERRA is able to provide measurement set-up and results, activity characterization and radioactive source localization, as well as to guarantee safety or process thresholds corresponding to the customer's needs. To improve processes best-in-class methodology, know-how and tools have been used in complex examples described in this paper. CANBERRA has demonstrated its ability to better and efficiently prepare for and execute decontamination and dismantling activities. (authors)

  5. Some steps of the dismantling of the hot cell ATTILA

    International Nuclear Information System (INIS)

    Terrasson, L.

    1989-01-01

    This paper describes the dismantling, during 2 years and just finished now, of a large hot cell (11.6 m x 5.90 m x 5.80 m) at Fontenay-aux-Roses (France) characterised by an importand irradiation and contamination mean dose rate 7 rads/hr, in some places 20 rads/hr, coming at 98 % from Cesium 137 (beta decay radioisotope). Put into operation in March 1967, the Attila cell was used for spent fuel processing using halogenides [fr

  6. Fabrication of mixed oxide fuel using plutonium from dismantled weapons

    International Nuclear Information System (INIS)

    Blair, H.T.; Chidester, K.; Ramsey, K.B.

    1996-01-01

    A very brief summary is presented of experimental studies performed to support the use of plutonium from dismantled weapons in fabricating mixed oxide (MOX) fuel for commercial power reactors. Thermal treatment tests were performed on plutonium dioxide powder to determine if an effective dry gallium removal process could be devised. Fabrication tests were performed to determine the effects of various processing parameters on pellet quality. Thermal tests results showed that the final gallium content is highly dependent on the treatment temperature. Fabrication tests showed that the milling process, sintering parameters, and uranium feed did effect pellet properties. 1 ref., 1 tab

  7. Status of the material capsule irradiation and the development of the new capsule technology in HANARO

    International Nuclear Information System (INIS)

    Choo, Kee-Nam; Kang, Young-Hwan; Choi, Myoung-Hwan; Cho, Man-Soon; Kim, Bong-Goo

    2006-01-01

    A material capsule system including a main capsule, fixing, control, cutting, and transport systems was developed for an irradiation test of non-fissile materials in HANARO. 14 irradiation capsules (12 instrumented and 2 non-instrumented capsules) have been designed, fabricated and successfully irradiated in the HANARO CT and IR test holes since 1995. The capsules were mainly designed for an irradiation of the RPV (Reactor Pressure Vessel), reactor core materials, and Zr-based alloys. Most capsules were made for KAERI material research projects, but 5 capsules were made as a part of national projects for the promotion of the HANARO utilization for universities. Based on the accumulated irradiation experience and the user's sophisticated requirements, development of new instrumented capsule technologies for a more precise control of the irradiation temperature and fluence of a specimen irrespective of the reactor operation has been performed in HANARO. (author)

  8. NASPGHAN Capsule Endoscopy Clinical Report.

    Science.gov (United States)

    Friedlander, Joel A; Liu, Quin Y; Sahn, Benjamin; Kooros, Koorosh; Walsh, Catharine M; Kramer, Robert E; Lightdale, Jenifer R; Khlevner, Julie; McOmber, Mark; Kurowski, Jacob; Giefer, Matthew J; Pall, Harpreet; Troendle, David M; Utterson, Elizabeth C; Brill, Herbert; Zacur, George M; Lirio, Richard A; Lerner, Diana G; Reynolds, Carrie; Gibbons, Troy E; Wilsey, Michael; Liacouras, Chris A; Fishman, Douglas S

    2017-03-01

    Wireless capsule endoscopy (CE) was introduced in 2000 as a less invasive method to visualize the distal small bowel in adults. Because this technology has advanced it has been adapted for use in pediatric gastroenterology. Several studies have described its clinical use, utility, and various training methods but pediatric literature regarding CE is limited. This clinical report developed by the Endoscopic and Procedures Committee of the North American Society of Pediatric Gastroenterology, Hepatology and Nutrition outlines the current literature, and describes the recommended current role, use, training, and future areas of research for CE in pediatrics.

  9. Herniation of the anterior lens capsule

    Directory of Open Access Journals (Sweden)

    Pereira Nolette

    2007-01-01

    Full Text Available Herniation of the anterior lens capsule is a rare abnormality in which the capsule bulges forward in the pupillary area. This herniation can be mistaken for an anterior lenticonus where both the capsule and the cortex bulge forward. The exact pathology behind this finding is still unclear. We report the clinical, ultrasound biomicroscopy (UBM and histopathological findings of a case of herniation of the anterior lens capsule. UBM helped to differentiate this entity from anterior lenticonus. Light microscopy revealed capsular splitting suggestive of capsular delamination and collection of fluid (aqueous in the area of herniation giving it a characteristic appearance.

  10. Diagnostic and therapeutic radio pharmaceutical capsules

    International Nuclear Information System (INIS)

    Haney, T.A.; Wedeking, P.W.; Morcos, N.A.

    1981-01-01

    An improved pharmaceutical radioactive capsule consisting of a non-toxic, water soluble material adapted to being ingested and rapidly disintegrating on contact with fluids of the gastro-intestinal tract is described. Each capsule is provided with filler material supporting a pharmaceutically useful radioactive compound absorbable from the gastro-intestinal tract. The capsule is preferably of gelatin, methyl cellulose or polyvinyl alcohol and the filler is a polyethylene glycol. The radioactive compound may be iodine e.g. sodium radioiodide I-131 or 123. The capsule may also contain a reducing agent e.g. sodium thiosulphate, sulphite, or bisulphite. (author)

  11. Stochastic Capsule Endoscopy Image Enhancement

    Directory of Open Access Journals (Sweden)

    Ahmed Mohammed

    2018-06-01

    Full Text Available Capsule endoscopy, which uses a wireless camera to take images of the digestive tract, is emerging as an alternative to traditional colonoscopy. The diagnostic values of these images depend on the quality of revealed underlying tissue surfaces. In this paper, we consider the problem of enhancing the visibility of detail and shadowed tissue surfaces for capsule endoscopy images. Using concentric circles at each pixel for random walks combined with stochastic sampling, the proposed method enhances the details of vessel and tissue surfaces. The framework decomposes the image into two detailed layers that contain shadowed tissue surfaces and detail features. The target pixel value is recalculated for the smooth layer using similarity of the target pixel to neighboring pixels by weighting against the total gradient variation and intensity differences. In order to evaluate the diagnostic image quality of the proposed method, we used clinical subjective evaluation with a rank order on selected KID image database and compared it to state-of-the-art enhancement methods. The result showed that the proposed method provides a better result in terms of diagnostic image quality and objective quality contrast metrics and structural similarity index.

  12. Remote Fiber Laser Cutting System for Dismantling Glass Melter - 13071

    Energy Technology Data Exchange (ETDEWEB)

    Mitsui, Takashi; Miura, Noriaki [IHI Corporation, 1 Shin-Nakahara-cho, Isogo-ku, Yokohama, Kanagawa (Japan); Oowaki, Katsura; Kawaguchi, Isao [IHI Inspection and Instrumentation Co., Ltd, 1 Shin-Nakahara-cho, Isogo-ku, Yokohama, Kanagawa (Japan); Miura, Yasuhiko; Ino, Tooru [Japan Nuclear Fuel Limited, 4-108, Aza Okitsuke, Oaza Obuchi, Rokkasho-Mura, Kamikita-gun, Aomori (Japan)

    2013-07-01

    Since 2008, the equipment for dismantling the used glass melter has been developed in High-level Liquid Waste (HLW) Vitrification Facility in the Japanese Rokkasho Reprocessing Plant (RRP). Due to the high radioactivity of the glass melter, the equipment requires a fully-remote operation in the vitrification cell. The remote fiber laser cutting system was adopted as one of the major pieces of equipment. An output power of fiber laser is typically higher than other types of laser and so can provide high-cutting performance. The fiber laser can cut thick stainless steel and Inconel, which are parts of the glass melter such as casings, electrodes and nozzles. As a result, it can make the whole of the dismantling work efficiently done for a shorter period. Various conditions of the cutting test have been evaluated in the process of developing the remote fiber cutting system. In addition, the expected remote operations of the power manipulator with the laser torch have been fully verified and optimized using 3D simulations. (authors)

  13. Dismantling method for reactor shielding wall and device therefor

    International Nuclear Information System (INIS)

    Akagawa, Katsuhiko.

    1995-01-01

    A ring member having an outer diameter slightly smaller than an inner diameter of a reactor shielding wall to be dismantled is lowered in the inside of the reactor shielding wall while keeping a horizontal posture. A cutting device is disposed at the lower peripheral edge of the ring member. The cutting device can move along the peripheral edge of the circular shape of the ring member. The ring member is urged against the inner surface of the reactor shielding wall by using an urging member to immobilize the ring member. Then, the cutting device is operated to cut the reactor shielding wall into a plurality of ring-like blocks at a plurality of inner horizontal ribs or block connection ribs. Then, the blocks of the cut reactor shielding wall are supported by the ring member, and transported out of the reactor container by a lift. The cut blocks transported to the outside are finely dismantled for every block in a closed chamber. (I.N.)

  14. Method of freezing type dismantling for wasted reactors

    International Nuclear Information System (INIS)

    Tatsumi, Toshiyuki.

    1985-01-01

    Purpose: To enable to operate a cutting device in the air by placing a working table on ice while utilizing the ice as radiation shielding materials thereby prevent the diffusion of air contaminations. Method: Upon dismantling a BWR type reactor, ice is packed into a reactor container and a pressure vessel and frozen state is maintained by cooling coils disposed to the outer circumference of the pressure vessel. Then, an airtight hood is covered over the pressure vessel and a working table is rotatably disposed therein. Upon working, when the upper layer ice is melted by a heat pump and discharged, the airtight hood is lowered to a predetermined level. After freezing the melted portion again at the lowered level, cutting work is conducted by an operator in the hood. The cut pieces are conveyed after hoisting the airtight hood by a crane. The pressure vessel is dismantled by repeating the foregoing procedures. In this way, cut pieces can be recovered without falling them to the reactor bottom as in the conventional work in water. In addition, since the procedures are conducted while covering the airtight hood, diffusion of air contaminations can be prevented. (Kamimura, M.)

  15. A Study on Dismantling of Westinghouse Type Nuclear Reactor

    International Nuclear Information System (INIS)

    Jeong, Woo-Tae; Lee, Sang-Guk

    2014-01-01

    KHNP started a research project this year to develop a methodology to dismantle nuclear reactors and internals. In this paper, we reviewed 3D design model of the reactor and suggested feasible cutting scheme.. Using 3-D CAD model of Westinghouse type nuclear reactor and its internals, we reviewed possible options for disposal. Among various options of dismantling the nuclear reactor, plasma cutting was selected to be the best feasible and economical method. The upper internals could be segmented by using a band saw. It is relatively fast, and easily maintained. For cutting the lower internals, plasma torch was chosen to be the best efficient tool. Disassembling the baffle and the former plate by removing the baffle former bolts was also recommended for minimizing storage volume. When using plasma torch for cutting the reactor vessel and its internal, installation of a ventilation system for preventing pollution of atmosphere was recommended. For minimizing radiation exposure during the cutting operation, remotely controlled robotic tool was recommended to be used

  16. The UK's National Programme for IT: Why was it dismantled?

    Science.gov (United States)

    Justinia, Taghreed

    2017-02-01

    This paper discusses the UK's National Programme for IT (NPfIT), which was an ambitious programme launched in 2002 with an initial budget of some £6.2 billion. It attempted to implement a top-down digitization of healthcare in England's National Health Service (NHS). The core aim of the NPfIT was to bring the NHS' use of information technology into the 21st century, through the introduction of an integrated electronic patient record systems, and reforming the way that the NHS uses information, and hence to improve services and the quality of patient care. The initiative was not trusted by doctors and appeared to have no impact on patient safety. The project was marred by resistance due to the inappropriateness of a centralized authority making top-down decisions on behalf of local organizations. The NPfIT was officially dismantled in September 2011. Deemed the world's largest civil IT programme, its failure and ultimate demise sparked a lot of interest as to the reasons why. This paper summarises the underlying causes that lead to dismantling the NPfIT. At the forefront of those circumstances were the lack of adequate end user engagement, the absence of a phased change management approach, and underestimating the scale of the project.

  17. SGN's Dismantling and Decommissioning engineering, projects experience and capabilities

    International Nuclear Information System (INIS)

    Destrait, L.

    1998-01-01

    Its experience in waste treatment, conditioning, storage and disposal, its cooperation with CEA and COGEMA Group in license agreements give SGN expertise in the decommissioning field. SGN's experience and background in all areas of nuclear facility decommissioning, such as chemical and mechanical cells, nuclear advanced reactors, reprocessing facilities result in fruitful references to the customers. The poster is presenting different achievements and projects with SGN's participation such as: - The decommissioning of Windscale Advanced Gas cooled Reactors (WAGR), in particular providing methodology and equipment to dismantle the Pressure and Insulation Vessel of the reactor. - The decommissioning plan of Ignalina (Lithuania) and Paldiski (Estonia), defining strategies, scenarios, necessary equipments and tools and choosing the best solutions to decommission the site under different influencing parameters such as cost, dose rate exposure, etc... - Th One Site Assistance Team (OSAT) at Chernobyl regarding the preparation works for the waste management and decommissioning of the plant. - The decommissioning of French nuclear facilities such as reprocessing (UP1) and reactor (EL4) plants. The important experience acquired during the facility management and during the first dismantling and decommissioning operations is an important factor for the smooth running of these techniques for the future. The challenge to come is to control all the operations, the choice of strategies, the waste management, the efficiency of tools and equipments, and to provide nuclear operators with a full range of proven techniques to optimise costs and minimize decommissioning personnel exposure. (Author)

  18. Dismantling of the research reactor RTS-1 Galileo Galilei in Pisa (Italy)

    International Nuclear Information System (INIS)

    Ruiz Martinez, J. t.; Farella, G.; Cimini, E.; Russo, M.

    2014-01-01

    This paper is about the most relevant aspects of the first phase of the dismantling, removal of the water in the pool, prior treatment through evaporation, the dismantling of all the submerged activated elements and other activated or contaminated elements that have been part of the nuclear facility. (Author)

  19. Know History, Know Self: Art Therapists' Responsibility to Dismantle White Supremacy

    Science.gov (United States)

    Hamrick, Cassie; Byma, Christine

    2017-01-01

    In this article, we call on white art therapists to assume responsibility for dismantling white supremacy in the field of art therapy, in personal as well as political-structural arenas. We respond to calls from scholars and writers of color for white people to assume increased responsibility for dismantling white supremacy in white communities…

  20. A treaty more alarming than efficient. The dismantled warheads will not be destroyed. Danger

    International Nuclear Information System (INIS)

    Riche, P.; Despic-Popovic, H.; Nougayrede, N.

    2002-01-01

    This political analysis presents the new treaty of nuclear weapons dismantling between Russia and Usa. In fact the warheads will not be completely dismantling but only stocked, leading to a possible recovery by terrorists. It underlines the real interests of this agreement which are more economic than peaceful. (A.L.B.)

  1. Note n. SD3-DEM-01 regulations procedures relative to the based nuclear installations dismantling

    International Nuclear Information System (INIS)

    2003-02-01

    This note aims to define the regulations procedures relative to the safety of based nuclear installations dismantling defined by the decree of the 11 december 1963 modified. The first part describes the two main phases of a based nuclear installation life, the operating and the dismantling phase. The second part is devoted to the procedures. (A.L.B.)

  2. Dismantling of an alpha contaminated hot cell at the Marcoule Pilot Plant

    International Nuclear Information System (INIS)

    Tachon, M.

    1988-01-01

    For the remodeling of Marcoule Pilot Plant, the cell 82: old unit for plutonium solution purification by extraction, was dismantled. About 42 tons of wastes were evacuated. Some wastes wen decontaminated by mechanical means other wastes with higher residual activity were stored for subsequent processing. The operation shows that dismantling of a hot cell is possible even if incorporated in an operating plant [fr

  3. Decontamination and dismantling at the CEA; L'assainissement et le demantelement au CEA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This document presents the dismantling policy at the CEA (French Research Center on the atomic energy), the financing of the decontamination and the dismantling, the regulatory framework, the knowledge and the technology developed at the CEA, the radiation protection, the environment monitoring and the installations. (A.L.B.)

  4. Process for the dismantling of buried equipment, with a contamination risk and eventually irradiating, and intervention enclosure for this process

    International Nuclear Information System (INIS)

    Bodin, F.; Saublet, J.C.

    1991-01-01

    Dismantling of buried equipment, for instance abandoned effluent pipes,is made by unitary sections under mobile enclosure with a self-supporting structure and a floor provided with a long central aperture giving access to the section to dismantle

  5. Passive sorting of capsules by deformability

    Science.gov (United States)

    Haener, Edgar; Juel, Anne

    We study passive sorting according to deformability of liquid-filled ovalbumin-alginate capsules. We present results for two sorting geometries: a straight channel with a half-cylindrical obstruction and a pinched flow fractioning device (PFF) adapted for use with capsules. In the half-cylinder device, the capsules deform as they encounter the obstruction, and travel around the half-cylinder. The distance from the capsule's centre of mass to the surface of the half-cylinder depends on deformability, and separation between capsules of different deformability is amplified by diverging streamlines in the channel expansion downstream of the obstruction. We show experimentally that capsules can be sorted according to deformability with their downstream position depending on capillary number only, and we establish the sensitivity of the device to experimental variability. In the PFF device, particles are compressed against a wall using a strong pinching flow. We show that capsule deformation increases with the intensity of the pinching flow, but that the downstream capsule position is not set by deformation in the device. However, when using the PFF device like a T-Junction, we achieve improved sorting resolution compared to the half-cylinder device.

  6. Study on applicability of evaluation model of manpower needs for dismantling of equipments in FUGEN-1. Dismantling process in 3rd/4th feedwater heater room

    International Nuclear Information System (INIS)

    Shibahara, Yuji; Izumi, Masanori; Nanko, Takashi; Tachibana, Mitsuo; Ishigami, Tsutomu

    2010-10-01

    Manpower needs for the dismantling process on the dismantling of equipments in FUGEN 3rd/4th feedwater heater room was calculated with the management data evaluation system (PRODIA Code), and it was inspected whether the conventional evaluation model had applicability for FUGEN or not. It was confirmed that the conventional evaluation model for feedwater heater had no applicability. In comparison of the calculated value with the actual data, we found two difference: 1) the calculated value were significantly larger than the actual data, 2) the actual data for the dismantling of 3rd feedwater heater was twice larger than that of 4th feedwater heater, though these equipments were almost same weight. It was found that these were brought 1) by the difference in the work descriptions of dismantling between JPDR and FUGEN, and 2) by that in the cutting number between 3rd feedwater heater and 4th one. The manpower needs for the dismantling of both feedwater heaters were calculated with a new calculation equation reflecting the descriptions of dismantling, and it was found that these results showed the good agreement with the actual data. (author)

  7. Experience of partial dismantling and large component removal of light water reactors

    International Nuclear Information System (INIS)

    Dubourg, M.

    1987-01-01

    Not any of the French PWR reactors need to be decommissioned before the next decade or early 2000. However, feasibility studies of decommissioning have been undertaken and several dismantling scenarios have been considered including the dismantling of four PWR units and the on-site entombment of the active components into a reactor building for interim disposal. In addition to theoretical evaluation of radwaste volume and activity, several operations of partial dismantling of active components and decontamination activities have been conducted in view of dismantling for both PWR and BWR units. By analyzing the concept of both 900 and 1300 MWe PWR's, it appears that the design improvements taken into account for reducing occupational dose exposure of maintenance personnel and the development of automated tools for performing maintenance and repairs of major components, contribute to facilitate future dismantling and decommissioning operations

  8. Development of an augmented reality based simulation system for cooperative plant dismantling work

    International Nuclear Information System (INIS)

    Ishii, Hirotake; Man, Zhiyuan; Yan, Weida; Shimoda, Hiroshi; Izumi, Masanori

    2015-01-01

    An augmented reality-based simulation system for cooperative plant dismantling work has been developed and evaluated. In the system, behaviors of virtual objects such as the dismantling target, chain blocks, and trolleys are physically simulated. Their appearance is superimposed on camera images captured with cameras on users' tablet devices. The users can manipulate virtual objects cooperatively via touch operation. They can cut the dismantling targets, lift them on the trolleys using chain blocks, and convey them through narrow passages to ascertain whether the dismantling targets can be conducted without colliding with the passages. During the simulation, collisions between the virtual objects and real work environment are detected based on their three-dimensional shape data measured in advance. The collided parts are visualized using augmented reality superimposition. Four evaluators assessed the simulation system. Results show that the simulation system can be useful for prior examination of dismantling works, but some points were also found to need improvement. (author)

  9. Decision support system for the dismantling of building in nuclear facilities

    International Nuclear Information System (INIS)

    Zeiher, M.

    2009-01-01

    In case of decommissioning and dismantling the complex structure of nuclear facilities requires a thorough selection of dismantling methods and a detailed operations planning. The decision for an appropriate technology with respect to economic, environmental and radiation protection aspects has to take into account that the different procedural steps are coordinated. Component specific boundary conditions and process parameters have to be considered. A data base was established that includes the process parameters for different dismantling methodologies. The next step is the determination of specific requirements of plant operators and engineers in order to identify the tasks in the frame of the dismantling process. The authors describes the decision support algorithm that allows to enhance the dismantling efficiency.

  10. Transparency in nuclear warhead dismantlement -- Limited chain of custody and warhead signatures

    International Nuclear Information System (INIS)

    Kiernan, G.; Percival, M.; Bratcher, L.

    1996-01-01

    The goal of the US Safeguards, Transparency, and Irreversibility (STI) initiative is the development of a series of transparency measures that provide confidence that nuclear warheads are actually being dismantled and that the fissile material being removed from these dismantled weapons is not recycled into new production. A limited chain of custody (LCC) would follow a warhead from the time it is declared excess until it is actually dismantled and the fissile materials are stored. Measurement of warhead signatures is an option in LCC using radiation detection techniques to confirm that a warhead has been dismantled, without intrusive inspections within the dismantlement facility. This paper discusses LCC and warhead signatures as well as indicate first results of laboratory measurements related to warhead signatures

  11. Chooz A: a model for the dismantling of water-cooled reactors

    International Nuclear Information System (INIS)

    Anon.

    2017-01-01

    The specificity of Chooz-A, the first French pressurized water reactor (PWR), is that the reactor and its major components (pumps, exchangers and cooling circuits) are installed in 2 caves dug out in a hill slope. Chooz-A was operating from 1967 to 1991, in 1993 the fuel was removed and in 2007 EDF received the authorization to dismantle the reactor. In 2012, EDF completed the dismantling of the cave containing the elements of the cooling circuit, a cornerstone was the removing of the four 14 m high steam generators. The dismantling of the pressure vessel began in march 2017, it is the same tools and the same processes that were used for the dismantling of the pressure vessel of the Zorita plant (Spain) in 2016. The end of the Chooz-A dismantling is expected in 2022. The feedback experience will help to standardize practices for the French fleet of PWRs. (A.C.)

  12. Evaluation methodology of a manipulator actuator for the dismantling process during nuclear decommissioning

    International Nuclear Information System (INIS)

    Park, Jongwon; Kim, Chang-Hoi; Jeong, Kyung-min; Choi, Byung-Seon; Moon, Jeikwon

    2016-01-01

    Highlights: • A methodology to evaluate actuators of a dismantling manipulator. • Evaluation criteria for choosing the most suitable actuator type. • A mathematical evaluation model for evaluation. • The evaluation method is expected to be used for determining other manipulators. - Abstract: This paper presents a methodology to evaluate actuators of a manipulator for dismantling nuclear power plants. Actuators are the most dominant components because a dismantling manipulator relies heavily on the actuator type used. To select the most suitable actuator, evaluation criteria are presented in four categories based on the nuclear dismantling environment. A mathematical model is presented and evaluation results are calculated with weights and scores for each criterion. The proposed evaluation method is expected to be used for determining other aspects of the design of dismantling manipulators.

  13. S.T.M.I.: Several years of experience in nuclear plant dismantling

    International Nuclear Information System (INIS)

    Moreau, J.C.

    1986-01-01

    Since 1977, when STMI performed its first dismantling operation, the Company appreciably improved in that field through important operations: the dismantling of the calciothermy and fluoration metal Pu preparation facility, in La Hague reprocessing plant, the dismantling of the slag treatment chain, associated to calciothermy and fluoration processes, in La Hague reprocessing plant, the cleaning of EL4 cell in Marcoule. To perform these operations, STMI's operating teams, on top of decontamination and dismantling technologies, strived to improve handling and transportation technologies, and to nuclearize many equipments. In order to increase its technical efficiency, STMI signed a cooperation agreement with TECHNICATOME company. Therefore, the union between the operational know-hows of STMI and the design experience of TECHNICATOME allow the needs of any customs facing a dismantling case to be satisfied [fr

  14. Apparatus for ultrasonic nebulization

    International Nuclear Information System (INIS)

    Olson, K.W.; Haas, W.J. Jr.; Fassel, V.A.

    1978-01-01

    An improved apparatus is described for ultrasonic nebulization of liquid samples or suspensions in which the piezoelectric transducer is protected from chemical attack and erosion. The transducer is protected by being bonded to the inner surface of a glass plate which forms one end wall of a first hollow body provided with apparatus for circulating a fluid for cooling and stabilizing the transducer. The glass plate, which is one-half wavelength in thickness to provide an acoustically coupled outer nebulizing surface, seals an opening in a second hollow body which encloses an aerosol mixing chamber. The second body includes apparatus for delivering the sample solution to the nebulizing surface, a gas inlet for providing a flow of carrier gas for transporting the aerosol of the nebulized sample and an aerosol outlet

  15. Uranium dioxide calcining apparatus

    International Nuclear Information System (INIS)

    Cole, E.A.; Peterson, R.S.

    1978-01-01

    This invention relates to an improved continuous calcining apparatus for consistently and controllably producing from calcinable reactive solid compounds of uranium, such as ammonium diuranate, uranium dioxide (UO 2 ) having an oxygen to uranium ratio of less than 2.2. The apparatus comprises means at the outlet end of a calciner kiln for receiving hot UO 2 , means for cooling the UO 2 to a temperature of below 100 deg C and conveying the cooled UO 2 to storage or to subsequent UO 2 processing apparatus where it finally comes into contact with air, the means for receiving cooling and conveying being sealed to the outlet end of the calciner and being maintained full of UO 2 and so operable as to exclude atmospheric oxygen from coming into contact with any UO 2 which is at elevated temperatures where it would readily oxidize, without the use of extra hydrogen gas in said means. (author)

  16. Intrauterine fertilization capsules--a clinical trial

    DEFF Research Database (Denmark)

    Lenz, S; Lindenberg, S; Sundberg, K

    1991-01-01

    Treatment of 26 women with tubal infertility was attempted using intrauterine capsules loaded with oocytes and spermatozoa. The stimulation protocol was as used for in vitro fertilization and embryo transfer and consisted of short-term use of Buserelin, human menopausal gonadotropin, and human...... and piston from an intrauterine device. Six complete capsules and parts of two other capsules were expelled. None of the women became pregnant, compared with a pregnancy rate of 21% per aspiration following in vitro fertilization and embryo transfer during the same period....... chorionic gonadotropin. Oocytes were collected by ultrasonically guided transvaginal aspiration, and spermatozoa were prepared by swim-up technique. The gametes were placed in agar capsules 4 hr after oocyte collection, and the capsules were introduced to the uterine fundus using an insertion tube...

  17. Electroplating method and apparatus

    International Nuclear Information System (INIS)

    Looney, R.B.; Smith, W.E.L.

    1978-01-01

    Disclosed is an apparatus for high speed electroplating or anodizing tubular members such as nuclear reactor fuel elements. A loading arm positions the member on a base for subsequent support by one of two sets of electrical contacts. A carriage assembly positions electrodes into and around the member. Electrolyte is pumped between the electrodes and the member while electric current is applied. Programmed controls sequentially employ each of the two sets of contacts to expose all surfaces of the member to the electrolyte. The member is removed from the apparatus by an unloading arm

  18. Electroplating method and apparatus

    Science.gov (United States)

    Looney, Robert B.; Smith, William E. L.

    1978-06-20

    An apparatus for high speed electroplating or anodizing tubular members such as nuclear reactor fuel elements. A loading arm positions the member on a base for subsequent support by one of two sets of electrical contacts. A carriage assembly positions electrodes into and around the member. Electrolyte is pumped between the electrodes and the member while electric current is applied. Programmed controls sequentially employ each of the two sets of contacts to expose all surfaces of the member to the electrolyte. The member is removed from the apparatus by an unloading arm.

  19. Adhesive capsulitis of the shoulder: MR arthrography

    International Nuclear Information System (INIS)

    Kim, Hyun Jeong; Han, Tae Il; Lee, Kwang Won; Choi, Youn Seon; Kim, Dae Hong; Han, Hyun Young; Song, Mun Kab; Kwon, Soon Tae

    2001-01-01

    Adhesive capsulitis is a clinical syndrome involving pain and decreased joint motion caused by thickening and contraction of the joint capsule. The purpose of this study is to describe the MR arthrographic findings of this syndrome. Twenty-nine sets of MR arthrographic images were included in the study. Fourteen patients had adhesive capsulitis diagnosed by physical examination and arthrography, and their MR arthrographic findings were compared with those of 15 subjects in the control group. The images were retrospectively reviewed with specific attention to the thickness of the joint capsule, volume of the axillary pouch (length, width, height(depth)), thinkness of the coracohumeral ligament, presence of extra-articular contrast extravasation, and contrst filling of the subcoracoid bursa. Mean capsular thickness measured at the inferior portion of the axillary pouch was 4.1 mm in patients with adhesive capsulitis and 1.5 mm in the control group. The mean width of the axillary pouch was 2.5 mm in patients and 9.5 mm in controls. In patients, the capsule was significantly thicker and the axillary pouch significantly narrower than in controls (p<0.05). Capsule thickness greater than 2.5 mm at the inferior portion of the axillary pouch (sensitivity 93%, specificity 80%) and a pouch narrower than 3.5 mm (sensitivity 93%, specificity 100%) were useful criteria for the diagnosis of adhesive capsulitis. In patients with this condition, extra-articular contrast extravasation was noted in six patients (43%) and contrast filling of the subcoracoid bursa in three (21%). The MR arthrographic findings of adhesive capsulitis are capsular thickening, a low-volume axillary pouch, extra-articular contrast extravasation, and contrast filling of the subcoracoid bursa. Capsule thickness greater than 2.5 mm at the inferior portion of the axillary pouch and a pouch width of less than 3.5 mm are useful diagnostic imaging characteristics

  20. Thermoregulation of Capsule Production by Streptococcus pyogenes

    Science.gov (United States)

    Kang, Song Ok; Wright, Jordan O.; Tesorero, Rafael A.; Lee, Hyunwoo; Beall, Bernard; Cho, Kyu Hong

    2012-01-01

    The capsule of Streptococcus pyogenes serves as an adhesin as well as an anti-phagocytic factor by binding to CD44 on keratinocytes of the pharyngeal mucosa and the skin, the main entry sites of the pathogen. We discovered that S. pyogenes HSC5 and MGAS315 strains are further thermoregulated for capsule production at a post-transcriptional level in addition to the transcriptional regulation by the CovRS two-component regulatory system. When the transcription of the hasABC capsular biosynthetic locus was de-repressed through mutation of the covRS system, the two strains, which have been used for pathogenesis studies in the laboratory, exhibited markedly increased capsule production at sub-body temperature. Employing transposon mutagenesis, we found that CvfA, a previously identified membrane-associated endoribonuclease, is required for the thermoregulation of capsule synthesis. The mutation of the cvfA gene conferred increased capsule production regardless of temperature. However, the amount of the capsule transcript was not changed by the mutation, indicating that a post-transcriptional regulator mediates between CvfA and thermoregulated capsule production. When we tested naturally occurring invasive mucoid strains, a high percentage (11/53, 21%) of the strains exhibited thermoregulated capsule production. As expected, the mucoid phenotype of these strains at sub-body temperature was due to mutations within the chromosomal covRS genes. Capsule thermoregulation that exhibits high capsule production at lower temperatures that occur on the skin or mucosal surface potentially confers better capability of adhesion and invasion when S. pyogenes penetrates the epithelial surface. PMID:22615992

  1. Hydrodynamick instabilities on ICF capsules

    International Nuclear Information System (INIS)

    Haan, S.W.

    1991-01-01

    This article summarizes our current understanding of hydrodynamic instabilities as relevant to ICF. First we discuss classical, single mode Rayleigh-Taylor instability, and nonlinear effects in the evolution of a single mode. Then we discuss multimode systems, considering: (1) the onset of nonlinearity; (2) a second order mode coupling theory for weakly nonlinear effects, and (3) the fully nonlinear regime. Two stabilization mechanisms relevant to ICF are described next: gradient scale length and convective stabilization. Then we describe a model which is meant to estimate the weakly nonlinear evolution of multi-mode systems as relevant to ICF, given the short-wavelength stabilization. Finally, we discuss the relevant code simulation capability, and experiments. At this time we are quite optimistic about our ability to estimate instability growth on ICF capsules, but further experiments and simulations are needed to verify the modeling. 52 refs

  2. 48 CFR 52.249-3 - Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements).

    Science.gov (United States)

    2010-10-01

    ... Convenience of the Government (Dismantling, Demolition, or Removal of Improvements). 52.249-3 Section 52.249-3... Convenience of the Government (Dismantling, Demolition, or Removal of Improvements). As prescribed in 49.502(b)(2), insert the following clause: Termination for Convenience of the Government (Dismantling...

  3. Cost Savings through Innovation in Decontamination, Decommissioning, and Dismantlement

    International Nuclear Information System (INIS)

    Yancey, Neal A.

    2003-01-01

    The United States Department of Energy (DOE) continually seeks safer and more cost effective technologies for the decontamination and decommissioning (D and D) of nuclear facilities. The Deactivation and Decommissioning Focus Area (DDFA) of the DOE's Office of Science and Technology (OST) sponsored large-scale demonstration and deployment projects (LSDDPs) to help bring new technologies into the D and D programs. The Idaho National Engineering and Environmental Laboratory (INEEL) LSDDP generated a list of needs defining specific problems where improved technologies could be incorporated into ongoing D and D tasks. The needs fell into 5 major categories--characterization, dismantlement, safety, material dispositioning, and decontamination. Technologies were carefully selected that provide a large benefit for a small investment. The technologies must provide significant improvements in cost, safety, radiation exposure, waste volume reduction, or schedule savings and widely applicable throughout the DOE complex. The LSDDP project provided training for the new technologies and worked with technology suppliers to resolve any questions that arose. Since 1998, 26 technologies have been demonstrated or deployed through the LSDDP for the D and D program at the INEEL. Of the 26 demonstrated and deployed technologies, 14 were in characterization, 3 were in decontamination, 4 were in dismantlement, 3 were in safety, and 2 were in material dispositioning. To promote the use of these technologies at other sites within the DOE complex, the LSDDP team published fact sheets, videos, technology summary reports, articles in INEEL star newspaper, posters, and maintained an internet home page on the project. As a result, additional deployments have taken place at the Hanford, Mound, Fernald, Oak Ridge, Ashtabula, and West Valley. Eight of the 26 technologies evaluated were developed in foreign countries. The technologies demonstrated have been shown to be faster, less expensive, and

  4. Dismantling of Evaporators by Laser Cutting Measurement of Secondary Emissions

    International Nuclear Information System (INIS)

    Pilot, Guy; Fauvel, Sylvain; Gosse, Xavier; De Dinechin, Guillaume

    2006-01-01

    In order to dismantle the evaporators of an obsolete reprocessing plant in Marcoule, studies were carried out by IRSN (Institut de Radioprotection et de Surete Nucleaire) / DSU/SERAC in cooperation with CEA (power laser group) on the laser cutting of steel structures, on the request of COGEMA (now AREVA NC) /Marcoule (UP1 dismantling project manager) and CEA/UMODD (UP1 dismantling owner). The aim of these studies was: - to quantify and to characterize the secondary emissions produced by Nd-YAG laser cutting of Uranus 65 steel pieces representative of UP1 evaporator elements and to examine the influence of different parameters, - to qualify a pre-filtration technique and particularly an electrostatic precipitator, - to compare the Nd-YAG used with other cutting tools previously studied. The experiments, which took place in a 35 m 3 ventilated cutting cell, allow to underline the following points: for the Uranus 65 steel, the sedimented dross, the deposits on the walls of the cutting cell and the aerosols drawn in the ventilation exhaust duct (∼ 275 m 3 /h), represent respectively between 92% and 99%, between 0.01% and 0.25% and between 1% and 8% of the total collected mass, the attached slag varies much from one configuration to the other and can sometimes amount to a relatively important fraction of the total mass, the kerves vary from 2 mm up to 7 mm for the Uranus 65 steel plates (thickness: 13.8 mm for the single plate and 12.8 + 3.5 mm for the double plate), the exhausted aerosol mass per cut length (g/m) decreases with the cutting speed, varies neither with the stand-off nor with the gas pressure, is dependent upon the gas nature (for the double plate), increases with the laser power, is strongly affected by the nature of the steel (stainless steel or mild steel) and is independent upon the plate position, the size distribution of aerosols is multimodal with a main mode often around 0.45 μm, the electrostatic precipitator has been a satisfactory prefilter

  5. Experience acquired by EDF in implementation of its dismantling programme

    Energy Technology Data Exchange (ETDEWEB)

    Klaeyle, S.; Dalmas, R.; Davoust, M. [EDF - Centre d' Ingenerie Deconstruction Environnement (CIDEN), 69 - Villeurbanne (France)

    2008-07-01

    EDF decided in 2001 to implement immediate dismantling of its first generation nuclear plants. Seven years after this decision, the physical progress of the programme is 24% and is due to reach 50 % by 2013. This paper presents the experiences acquired in the fields of organization, project and programme management, purchasing strategies and waste management. Until now, the principal works involve Brennilis (Heavy water), ChoozA (PWR) and Creys Malville (fast breeder reactor). The detailed pre-project concerning the first of the six gas graphite reactors is complete and the call for bids process has been launched. The organization to manage projects, established at the De-construction and Environment Engineering Center (CIDEN), is effective and productive. Estimates of costs and expenses are coherent, which makes the forecasts put together to finance the programme secure. CIDEN has carried out significant engineering work over the last six years, making it possible to apply for the administrative authorizations which have now been obtained or are in the process of being obtained. Technical specifications are prepared at an optimized level of detail according to a contractual policy adapted to the complexity of the operations and the sharing of risk with manufacturers. The ChoozA contractualization process has been launched and the first dismantling work has begun in the nuclear auxiliary part. The main Brennilis contract will be completed in mid- 2008 and dismantling works will restart after renewal of the decree which was cancelled in mid-2007. Treatment of sodium from Creys Malville is about to begin, leading to elimination of the sodium risk by 2013. The very low activity waste (TFA) and low to medium activity waste (FA-MA) removal chains are operational. The intermediate activity/long lived (MA-VL) waste will be stored in a facility which will be brought into operational service in 2012. The graphite storage center is due to open between 2017 and 2019

  6. Semiconductor apparatus and method of fabrication for a semiconductor apparatus

    NARCIS (Netherlands)

    2010-01-01

    The invention relates to a semiconductor apparatus (1) and a method of fabrication for a semiconductor apparatus (1), wherein the semiconductor apparatus (1) comprises a semiconductor layer (2) and a passivation layer (3), arranged on a surface of the semiconductor layer (2), for passivating the

  7. Method and jig for dismantling nuclear fuel assembly

    International Nuclear Information System (INIS)

    Urata, Megumi; Watahiki, Minoru.

    1989-01-01

    The object of the present inention is to extract a fuel element from a lower tie plate safely and at high efficiency by a remote control operation. That is, a forked top end of a lever of a dismantling jig is inserted between the tapered portion of a lower end plug and a lower tie plate. Then, a load is applied to the counter-lower end side of the lever by a motor. This exerts an elevating force to the fuel elements to easily release fixture between the lower end plug and the lower tie plate. Since the fuel can of fuel elements is not applied with a force by this mehtod, operation safety can be improved. (I.J.)

  8. Decontamination before dismantling a fast breeder reactor primary cooling system

    International Nuclear Information System (INIS)

    Costes, J.R.; Antoine, P.; Gauchon, J.P.

    1997-01-01

    The large-scale decontamination of FBR sodium loops is a novel task, as only a limited number of laboratory-scale results are available to date. The principal objective of this work is to develop a suitable decontamination procedure for application to the primary loops of the RAPSODIE fast breeder reactor as part of decommissioning to Stage 2. After disconnecting the piping from the main vessel, the pipes were treated by circulating chemical solutions and the vessels by spraying. The dose rate in the areas to be dismantled was divided by ten. A decontamination factor of about 300 was obtained, and should allow austenitic steel parts to be melted in special furnaces for unrestricted release. (author)

  9. The Dismantling of the Japanese Model in Consumer Electronics

    DEFF Research Database (Denmark)

    Frøslev Christensen, Jens; Holm Olesen, Michael; Kjær, Jonas

    This paper addresses an issue of great importance for the future organization of the consumerelectronics industry: the "battle" of control over component-based digitization. We are now witnessing the dismantling of the Japanese Model that has prevailed in consumer electronicsover the past 30 years....... Specialized and large-scale component suppliers have taken the lead inmost component-based innovations and have obtained increasingly powerful positions in thevalue chain of consumer electronics. This paper provides an in-depth study of the strategic andstructural ramifications of one such component...... technology. Aframework is developed to explain the reluctance of most of the large consumer electronicsgiants in developing/adopting this new technology.Key words: Consumer electronics, Industrial dynamics, Open InnovationJEL Codes: L6, L68, O32...

  10. Decommissioning and Dismantling of the Floating Maintenance Base 'Lepse' - 13316

    International Nuclear Information System (INIS)

    Field, D.; Mizen, K.

    2013-01-01

    The Lepse was built in Russia in 1934 and commissioned as a dry cargo ship. In 1961 she was re-equipped for use as a nuclear service ship (NSS), specifically a floating maintenance base (FMB), to support the operation of the civilian nuclear fleet (ice-breakers) of the USSR. In 1988 Lepse was taken out of service and in 1990 she was re-classified as a 'berth connected ship', located at a berth near the port of Murmansk under the ownership of Federal State Unitary Enterprise (FSUE) Atomflot. Lepse has special storage facilities for spent nuclear fuel assemblies (SFA) that have been used to store several hundred SFAs for nearly 40 years. High and intermediate-level liquid radioactive waste (LRW) is also present in the spent nuclear fuel assembly storage channels, in special tanks and also in the SFA cooling circuit. Many of the SFAs stored in Lepse are classified as damaged and cannot be removed using standard procedures. The removal of the SFA and LRW from the Lepse storage facilities is a hazardous task and requires specially designed tools, equipment and an infrastructure in which these can be deployed safely. Lepse is a significant environmental hazard in the North West of Russia. Storing spent nuclear fuel and high-level liquid radioactive waste on board Lepse in the current conditions is not acceptable with respect to Russian Federation health, safety and environmental standards and with international best practice. The approved concept design for the removal of the SFA and LRW and dismantling of Lepse requires that the ship be transported to Nerpa shipyard where specialist infrastructure will be constructed and equipment installed. One of the main complexities of the Project lies within the number of interested stakeholders involved in the Project. The Lepse project has been high focus on the international stage for many years with previous international efforts failing to make significant progress towards the objective of decommissioning Lepse. The Northern

  11. Outsourcing and "dismantling" of steady jobs at hospitals

    Directory of Open Access Journals (Sweden)

    Helton Saragor de Souza

    2016-04-01

    Full Text Available Abstract OBJECTIVE To relate hospitals' organizational structure as the core of a web of outsourced services and flexible employment bonds among healthcare professionals in the context of finance capitalism, analyzing work arrangements based mainly on the type of employment bond. METHOD Qualitative research through ethnography, interviews, data analysis, and case studies. The case studies were concentrated in 3 hospitals located in the São Paulo metropolitan region under different management types: public administration; outsourced administration via a healthcare social organization (HSO; and private administration. RESULTS This study highlights a trend in outsourcing, dismantling of steady jobs, and shaping working relations asymmetrically in terms of healthcare professions. CONCLUSION These aspects are characteristic of contemporary capitalism and post-Fordist work organization. In this context, the state under sponsorship cripples the very existence of an effective human resources policy, creating a favorable environment for outsourcing and flexibility of employment bonds among healthcare workers.

  12. The Dismantling Project for the Large Electron Positron (LEP) Collider

    CERN Document Server

    Poole, John

    2002-01-01

    The LEP accelerator was installed in a circular tunnel 27 km in length with nine access points distributed around the circumference in the countryside and villages which surround CERN's sites. The dismantling project involved the removal in less than 15 months of around 29000 tonnes of equipment from the accelerator itself and a further 10000 tonnes from the four experiments - all of which were located at an average depth of 100 m below ground level. There was no contamination risk in the project and less than 3% of the materials removed were classified as radioactive. However, the materials which were classified as radioactive have to be temporarily stored and they consume considerable resources. The major difficulties for the project were in the establishment of the theoretical radiological zoning, implementation of the traceability systems and making appropriate radiation measurements to confirm the zoning. The absence of detailed guidelines from the French authorities, having no threshold levels for relea...

  13. Large components dismantlement flow chart in the United States

    International Nuclear Information System (INIS)

    Szilagyi, Andrew

    2012-01-01

    The beginning steps are identical for large or regular components. The starting point of this flowchart assumes that it has already been determined the component has been categorized as waste. The first step is to make sure that all components are handled safely, that ALARA is followed, that any security concerns are managed, and that the dismantlement cost or any other cost is constantly reviewed. After this, the process knowledge and acceptable knowledge should be reviewed; this will help in the following step which is characterization with non-destructive assay. At this point, the project manager is presented with the first three alternatives which will determine the path to follow: Low level waste (LLW) disposal flowchart, part 1 to 3 , Transuranic waste (TRU) disposal flowchart, part 1 and 2 , or High level waste (HLW) disposal flowchart

  14. Mock-up-CZ: dismantling of the experiment - Geotechnical results

    International Nuclear Information System (INIS)

    Svoboda, J.; Vasicek, R.

    2010-01-01

    Document available in extended abstract form only. The issue of the disposal of radioactive waste is one of the most pressing challenges of our age, for which, in most countries, the deep repository concept is generally considered to be the most suitable final solution. In order to make such a repository both safe and reliable, intensive research is underway worldwide. The construction of physical models is one approach to the study of the engineered barriers for deep geological repositories; one such experiment, Mock-Up-CZ, has been performed at the Centre of Experimental Geotechnics, CTU in Prague. The Mock-Up-CZ experiment simulated the vertical placement of a container with radioactive waste, an approach that is in line with the Swedish KBS-3 system. The physical model consisted of a barrier made up of bentonite blocks, powdered bentonite backfill, a heater and hydration and monitoring systems. The whole experiment was enclosed in a cylindrical box, whose construction was able to withstand high pressure due to bentonite swelling. A number of sensors (monitoring changes in temperature, pressure and moisture) were placed inside the bentonite barrier. The basic material used in the experiment consisted of a mixture of Czech bentonite from the Rokle deposit (85%), quartz sand (10%) and graphite (5%). The first phase of the experiment commenced on 7 May 2002, during which the heater was switched on, with no water input. After 6 months the second phase commenced in which water was introduced through the hydration system. This phase ended on 2nd January 2006 when the heater was switched off. After allowing time for cooling, the dismantling phase commenced (30 January 2006). After a further one and a half months (17 March 2006) the dismantling of the experimental vessel was completed. Post-decommissioning analysis continued until the end of 2007. Dismantling and post-decommissioning analysis were carried out according to a very detailed plan which included not only

  15. Tomographic scanning apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    Details are given of a tomographic scanning apparatus, with particular reference to the means of adjusting the apparent gain of the signal processing means for receiving output signals from the detectors, to compensate for drift in the gain characteristics, including means for passing a reference signal. (U.K.)

  16. Positioning and locking apparatus

    Science.gov (United States)

    Hayward, M.L.; Harper, W.H.

    1985-06-19

    A positioning and locking apparatus including a fixture having a rotatable torque ring provided with a plurality of cam segments for automatically guiding a container into a desired location within the fixture. Rotation of the ring turns the container into a final position in pressure sealing relation against a hatch member.

  17. Electrolysis apparatus and method

    International Nuclear Information System (INIS)

    1975-01-01

    A procedure in which electrolysis is combined with radiolysis to improve the reaction yield is proposed for the production of hydrogen and oxygen from water. An apparatus for this procedure is disclosed. High-energy electric pulses are applied between the anode and kathode of an electrolytical cell in such a way that short-wave electromagnetic radiation is generated at the same time

  18. Mobile lighting apparatus

    Science.gov (United States)

    Roe, George Michael; Klebanoff, Leonard Elliott; Rea, Gerald W; Drake, Robert A; Johnson, Terry A; Wingert, Steven John; Damberger, Thomas A; Skradski, Thomas J; Radley, Christopher James; Oros, James M; Schuttinger, Paul G; Grupp, David J; Prey, Stephen Carl

    2013-05-14

    A mobile lighting apparatus includes a portable frame such as a moveable trailer or skid having a light tower thereon. The light tower is moveable from a stowed position to a deployed position. A hydrogen-powered fuel cell is located on the portable frame to provide electrical power to an array of the energy efficient lights located on the light tower.

  19. Apparatus for decomposing shale

    Energy Technology Data Exchange (ETDEWEB)

    Gislain, M

    1865-06-20

    The apparatus is designed to fulfill the three following conditions: (1) complete extraction of the mineral oil, by avoiding partial decomposition; (2) purification of the said oil from products formed in the decomposition of the shale; (3) breaking down of the said oil into more products of different density. The separation of the heavy and bituminous products is claimed.

  20. Building scientific apparatus

    National Research Council Canada - National Science Library

    Moore, John H; Davis, Christopher C; Coplan, Michael A; Greer, Sandra C

    2009-01-01

    ... specification of the components of apparatus, many new to this edition. Data on the properties of materials and components used by manufacturers are included. Mechanical, optical, and electronic construction techniques carried out in the laboratory, as well as those let out to specialized shops, are also described. Step-by-step instruc...

  1. Cutting techniques for facilities dismantling in decommissioning projects

    International Nuclear Information System (INIS)

    Lainetti, Paulo E.O.

    2011-01-01

    Fuel cycle related activities were accomplished in IPEN-CNEN/SP in laboratory and pilot plant scale and most facilities were built in the 70-80 years. Nevertheless, radical changes of the Brazilian nuclear policy in the beginning of 90's determined the interruption of several fuel cycle activities and facilities shutdown. Some laboratory and pilot plant decommissioning activities have been performed in IPEN in the last years. During the operational activities in the decommissioning of old nuclear fuel cycle facilities, the personnel involved in the task had to face several problems. In old facilities, the need of large components dismantling and material removal use to present some difficulties, such as lack of available and near electricity supply. Besides this, the spread out of the superficial contamination in the form of dust or aerosols and the exposure of workers should be as much as possible avoided. Then, the selection and availability of suitable tools for the task, mainly those employed for cutting and segmentation of different materials is of significant importance. Slight hand tools, mainly those powered by rechargeable batteries, facilitate the work, especially in areas where the access is difficult. Based on the experience in the dismantling of some old nuclear facilities of IPEN-CNEN/SP, some tools that would have facilitated the operations were identified and their availability could have improved the quality and efficiency of different individual tasks. In this paper different cutting problems and techniques, as well as some available commercial hand tools, are presented as suggestion for future activities. (author)

  2. [Evaluation of nopal capsules in diabetes mellitus].

    Science.gov (United States)

    Frati Munari, A C; Vera Lastra, O; Ariza Andraca, C R

    1992-01-01

    To find out if commercial capsules with dried nopal (prickle-pear cactus, Opuntia ficus indica may have a role in the management of diabetes mellitus, three experiments were performed: 30 capsules where given in fasting condition to 10 diabetic subjects and serum glucose was measured through out 3 hours; a control test was performed with 30 placebo capsules. OGTT with previous intake of 30 nopal or placebo capsules was performed in ten healthy individuals. In a crossover and single blinded study 14 diabetic patients withdrew the oral hypoglycemic treatment and received 10 nopal or placebo capsules t.i.d. during one week; serum glucose, cholesterol and tryglycerides levels were measured before and after each one-week period. Five healthy subjects were also studied in the same fashion. Opuntia capsules did not show acute hypoglycemic effect and did not influence OGTT. In diabetic patients serum glucose, cholesterol and tryglycerides levels did not change with Opuntia, but they increased with placebo (P nopal, while cholesterol and triglycerides decreased (P < 0.01 vs. placebo). The intake of 30 Opuntia capsules daily in patients with diabetes mellitus had a discrete beneficial effect on glucose and cholesterol. However this dose is unpractical and at present it is not recommended in the management of diabetes mellitus.

  3. Radioactive waste processing apparatus

    Science.gov (United States)

    Nelson, R.E.; Ziegler, A.A.; Serino, D.F.; Basnar, P.J.

    1985-08-30

    Apparatus for use in processing radioactive waste materials for shipment and storage in solid form in a container is disclosed. The container includes a top, and an opening in the top which is smaller than the outer circumference of the container. The apparatus includes an enclosure into which the container is placed, solution feed apparatus for adding a solution containing radioactive waste materials into the container through the container opening, and at least one rotatable blade for blending the solution with a fixing agent such as cement or the like as the solution is added into the container. The blade is constructed so that it can pass through the opening in the top of the container. The rotational axis of the blade is displaced from the center of the blade so that after the blade passes through the opening, the blade and container can be adjusted so that one edge of the blade is adjacent the cylindrical wall of the container, to insure thorough mixing. When the blade is inside the container, a substantially sealed chamber is formed to contain vapors created by the chemical action of the waste solution and fixant, and vapors emanating through the opening in the container. The chamber may be formed by placing a removable extension over the top of the container. The extension communicates with the apparatus so that such vapors are contained within the container, extension and solution feed apparatus. A portion of the chamber includes coolant which condenses the vapors. The resulting condensate is returned to the container by the force of gravity.

  4. Oxygen fugacity and piston cylinder capsule assemblies

    Science.gov (United States)

    Jakobsson, S.

    2011-12-01

    A double capsule assembly designed to control oxygen fugacity in piston cylinder experiments has been tested at 1200 °C and 10 kbar. The assembly consists of an outer Pt-capsule containing a solid buffer (Ni-NiO or Co-CoO plus H2O) and an inner AuPd-capsule containing the sample, H2O and a Pt-wire. To prevent direct contact with the buffer phases the AuPd-capsule is embedded in finely ground Al2O3 along with some coarser, fractured Al2O3 facilitating fluid inclusion formation. No water loss is observed in the sample even after 48 hrs but a slight increase in water content is observed in longer duration runs due to oxygen and hydrogen diffusion into the AuPd-capsule. Carbon from the furnace also diffuses through the outer Pt-capsule but reacts with H2O in the outer capsule to form CO2 and never reaches the inner capsule. Oxygen fugacity of runs in equilibrium with the Ni-NiO and Co-CoO buffers was measured by analyzing the Fe content of the Pt-wire in the sample1 and by analyzing Fe dissolved in the AuPd capsule2. The second method gives values that are in good agreement with established buffer whereas results from the first method are one half to one log units higher than the established values. References 1. E. Medard, C. A. McCammon, J. A. Barr, T. L. Grove, Am. Mineral. 93, 1838 (2008). 2. J. Barr, T. Grove, Contrib. Mineral. Petrol. 160, 631 (2010)

  5. Optimized phases for reactor dismantling – an efficient and sustainable concept

    International Nuclear Information System (INIS)

    Krüger, S.; Winter, J.

    2013-01-01

    D&D projects are driven by costs, to implement an optimization process from the very beginning is key. Optimized strategy and sequencing of the dismantling (hot to cold) will provide serious economical savings . Larger dismantling packages will reduce interfaces and ease the coordination efforts on site. Early usage of mobile systems will ease the large-scale release for dismantling Social transition has to be addressed with priority and to be planned at an early phase in the D&D planning Concept, Planning & Project Management will influence the success of the project much more than the used technique

  6. Clearance of radioactive materials during reactor dismantling. Permanent enclosure instead of demolition and renaturation?

    International Nuclear Information System (INIS)

    2016-01-01

    During reactor dismantling besides high-level radioactive wastes a large amount of low-level contaminated steel and concrete has to be disposed. In case that radioactivity falls below defined dose limits (10 micro Sv/person and year) these materials may be disposed in domestic waste landfill or in municipal incineration facilities. The issue is discussed in detail including the fact that many power plants are dismantled at the same time so that the contaminated materials might accumulate. Another issue is the occupational safety of contract workers during dismantling. The permanent enclosure could avoid this environmental contamination of decommissioned power plants might also be less expensive.

  7. Importance of low-level radioactive wastes in dismantling strategy in CEA (FRANCE)

    International Nuclear Information System (INIS)

    Lafaille, C.

    1991-01-01

    This paper describes the advance used in C.E.A. to realize dismantling operations in the best technical and economical conditions. Particularly, for low-level radioactive waste management CEA's advance defines, first, the final destination of dismantling materials: - recycling in public lands for level activity inferior to 1 Bq/g; directly or after transformation (melting, calcination, extrusion) - storage in a ground disposal, after compacting, encapsulation or drumming. Two examples are given: - Marcoule G2 - G3 reactor dismantling - Gaseous diffusion plants demolition (COGEMA Pierrelatte)

  8. NucLab Marcoule. A laboratory facility dedicated to support dismantling operations

    International Nuclear Information System (INIS)

    Dugne, O.; Houssin, A.; Pierre, D.; Bec-Espitalier, L.

    2013-06-01

    Formerly dedicated to plutonium production support, NucLab was renovated to perform a wide range of analyses for dismantling, plant operation and process development activities mainly on Marcoule site but also outside (Veurey, Fontenay aux Roses). The Laboratory is under a CEA AREVA partnership as a CEA entity operated by AREVA employees. It provides services to several industrial operators (nuclear process and power plant) in the fields of analytical chemistry, radioactivity measurements, in situ nuclear measurements, decontamination processes and industrial chemistry processes, waste treatments to meet the following analysis requirements. NucLab today is able to support research, production and dismantling activities in all part of dismantling operations. (authors)

  9. System approach as a tool for optimization of the dismantling technological process of NPP decommissioning

    International Nuclear Information System (INIS)

    Bylkin, B.K.; Shpitser, V.Ya.

    1994-01-01

    The concept of NPP unit decommissioning has been considered. Special attention was paid to the stage of dismantling of NPP unit equipment. Employment of systematic approach as a tool for optimization of dismantling processes permits formalizing manipulations with certified indices of quality and it permits an objective assessment of the dismantling technology level attained during designing as compared with the basic one. It seems appropriate to develop a basic project of NPP unit decommissioning as a technical means of planning, predicting and evaluating ecological and social aftereffects

  10. Report of working group for technical standard of cutting and melting works in Glovebox dismantling

    International Nuclear Information System (INIS)

    Asazuma, Shinichiroh; Takeda, Shinsoh; Tajima, Shoichi

    2004-11-01

    In order to prevent spread of contamination, glovebox dismantling activity is usually performed in a confined enclosure with personal radioactive protective equipment. Since large potion of these materials is made of vinyl acetate, there exist potential risks of fire, damage and injury to the environment and workers during the dismantling (cutting or melting) operation. It is therefore important to establish standard for proper use of equipment and hazard controls in such a specific environment. Working Group composed of Tokai Works and Oarai Works has examined and developed the operational standard for cutting work in glovebox dismantlement. The result is reflected to the Tokai Works Safety Operational Standard. (author)

  11. Capsule production by Pseudomonas aeruginosa

    Energy Technology Data Exchange (ETDEWEB)

    Lynn, A.R.

    1984-01-01

    Mucoid strains of Pseudomonas aeruginosa, associated almost exclusively with chronic respiratory infections in patients with cystic fibrosis, possess a capsule composed of alginic acid similar to one produced by Azotobacter vinelandii. Recent reports have provided evidence that the biosynthetic pathway for alginate in P. aeruginosa may differ from the pathway proposed for A. vinelandii in that synthesis in P. aeruginosa may occur by way of the Entner-Doudoroff pathway. Incorporation of isotope from (6-/sup 14/C)glucose into alginate by both P. aueroginosa and A. vinelandii was 10-fold greater than that from either (1-/sup 14/C)/sup -/ or (2-/sup 14/C)glucose, indicating preferential utilization of the bottom half of the glucose molecule for alginate biosynthesis. These data strongly suggest that the Entner-Doudoroff pathway plays a major role in alginate synthesis in both P. aeruginosa and A. vinelandii. The enzymes of carbohydrate metabolism in mucoid strains of P. aeruginosa appear to be unchanged whether alignate is actively produced or not and activities do not differ significantly from nonmucoid strain PAO.

  12. Vortex rings from Sphagnum moss capsules

    Science.gov (United States)

    Whitaker, Dwight; Strassman, Sam; Cha, Jung; Chang, Emily; Guo, Xinyi; Edwards, Joan

    2010-11-01

    The capsules of Sphagnum moss use vortex rings to disperse spores to suitable habitats many kilometers away. Vortex rings are created by the sudden release of pressurized air when the capsule ruptures, and are an efficient way to carry the small spores with low terminal velocities to heights where they can be carried by turbulent wind currents. We will present our computational model of these explosions, which are carried out using a 2-D large eddy simulation (LES) on FLUENT. Our simulations can reproduce the observed motion of the spore clouds observed from moss capsules with high-speed videos, and we will discuss the roles of bursting pressure, cap mass, and capsule morphology on the formation and quality of vortex rings created by this plant.

  13. 21 CFR 520.1660b - Oxytetracycline hydrochloride capsules.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Oxytetracycline hydrochloride capsules. 520.1660b... Oxytetracycline hydrochloride capsules. (a) Specifications. The drug is in capsule form with each capsule containing 125 or 250 milligrams of oxytetracycline hydrochloride. Oxytetracycline is the antibiotic...

  14. Nuclear magnetic resonance apparatus

    International Nuclear Information System (INIS)

    Lambert, R.

    1991-01-01

    In order to include the effect of a magnetic object in a subject under investigation, Nuclear Magnetic Resonance (NMR) apparatus is operable at more than one radio frequency (RF) frequency. The apparatus allows normal practice as far as obtaining an NMR response or image from a given nuclear species is concerned, but, in addition, interrogates the nuclear spin system at a frequency which is different from the resonance frequency normally used for the given nuclear species, as determined from the applied magnetic field. The magnetic field close to a magnetised or magnetisable object is modified and the given nuclear species gives a response at the different frequency. Thus detection of a signal at the frequency indicates the presence of the chosen nuclei close to the magnetised or magnetisable object. Applications include validation of an object detection or automatic shape inspection system in the presence of magnetic impurities, and the detection of magnetic particles which affect measurement of liquid flow in a pipe. (author)

  15. Ion implantation apparatus

    International Nuclear Information System (INIS)

    Forneris, J.L.; Hicks, W.W.; Keller, J.H.; McKenna, C.M.; Siermarco, J.A.; Mueller, W.F.

    1981-01-01

    The invention relates to ion bombardment or implantation apparatus. It comprises an apparatus for bombarding a target with a beam of ions, including an arrangement for measuring the ion beam current and controlling the surface potential of the target. This comprises a Faraday cage formed, at least in part, by the target and by walls adjacent to, and electrically insulated from, the target and surrounding the beam. There is at least one electron source for supplying electrons to the interior of the Faraday cage and means within the cage for blocking direct rectilinear radiation from the source to the target. The target current is measured and combined with the wall currents to provide a measurement of the ion beam current. The quantity of electrons supplied to the interior of the cage can be varied to control the target current and thereby the target surface potential. (U.K.)

  16. Improvements in measuring apparatus

    International Nuclear Information System (INIS)

    Casey, W.

    1976-01-01

    Measuring apparatus is described that is suitable for gauging the wall profiles of downwardly extending channels in nuclear reactors, but which is equally applicable to channels such as pipe bores and conduits in other types of plant. The apparatus comprises a probe carrying a measuring transducer giving an electrical output. The probe support may be moved stepwise along the channel along a track between end members. An electrical conductor is provided for transmitting the electrical output of the transducer to an indicator located remote from the probe. The probe support may consist of a cable attached at one end to a winding drum, and incorporating an electrical conductor connected to the transducer. Channel engaging means are provided on the probe that permits free upward movement of the probe when the latter is suspended by the cable and moves into gripping engagement with the channel wall when the tension in the cable is relaxed. (U.K.)

  17. Adhesive capsulitis: review of imaging and treatment

    International Nuclear Information System (INIS)

    Harris, Guy; Bou-Haider, Pascal; Harris, Craig

    2013-01-01

    Adhesive capsulitis is one of the most common conditions affecting the shoulder; however, early clinical diagnosis can be challenging. Treatment is most effective when commenced prior to the onset of capsular thickening and contracture; consequently, the role of imaging is increasing. The aim of this review is to demonstrate the typical imaging appearances of adhesive capsulitis and to examine some of the evidence regarding each of these imaging modalities. An evaluation of the various management options available to the clinician is also presented.

  18. Radioactive gas-containing polymeric capsule

    International Nuclear Information System (INIS)

    Winchell, H.S.; Lewis, R.E.

    1975-01-01

    A disposable ventilation study system for dispensing a single patient dosage of gaseous radioisotopes to patients for pulmonary function studies is disclosed. A gas impermeable capsule encloses the gaseous radioisotope and is stored within a radioactivity shielding body of valve means which shears the capsule to dispense the radioisotope to the patient. A breathing bag receives the patient's exhalation of the radioisotope and permits rebreathing of the radioisotope by the patient. 18 claims, 7 drawing figures

  19. Wave disc engine apparatus

    Energy Technology Data Exchange (ETDEWEB)

    Muller, Norbert; Piechna, Janusz; Sun, Guangwei; Parraga, Pablo-Francisco

    2018-01-02

    A wave disc engine apparatus is provided. A further aspect employs a constricted nozzle in a wave rotor channel. A further aspect provides a sharp bend between an inlet and an outlet in a fluid pathway of a wave rotor, with the bend being spaced away from a peripheral edge of the wave rotor. A radial wave rotor for generating electricity in an automotive vehicle is disclosed in yet another aspect.

  20. Medical radiological apparatus

    International Nuclear Information System (INIS)

    1980-01-01

    With the apparatus described, images can be obtained by rotation scanning and the image formation from a three dimensional image matrix is converted into an overall picture. Detectors for both X-ray radiation and γ radiation are present and these consist of a row of detector elements, from each of which a separate read-out can be obtained. Therefore both X-ray and γ ray images emitted from the examined object can be obtained. (Th.P.)

  1. Multicusp plasma containment apparatus

    International Nuclear Information System (INIS)

    Limpaecher, R.

    1980-01-01

    It has been discovered that plasma containment by a chamber having multi-pole magnetic cusp reflecting walls in combination with electronic injection for electrostatic containment provides the means for generating magnetic field free quiescent plasmas for practical application in ion-pumps, electronic switches, and the like. 1250 ''alnico v'' magnets 1/2 '' X 1/2 '' X 1 1/2 '' provide containment in one embodiment. Electromagnets embodying toroidal funneling extend the principle to fusion apparatus

  2. Apparatus for obtaining radiographs

    International Nuclear Information System (INIS)

    Frank, L.F.

    1977-01-01

    An apparatus for making x-ray pictures by imagewise exposing a cloud chamber containing a high atomic number gas mixed with a condensate vapor is described. The gas is under sufficiently high pressure to assure substantially complete absorption of the incident x-rays. Optical means are provided so that visible x-ray tracks are viewed from a direction aligned with the tracks

  3. Pyrolysis process and apparatus

    Science.gov (United States)

    Lee, Chang-Kuei

    1983-01-01

    This invention discloses a process and apparatus for pyrolyzing particulate coal by heating with a particulate solid heating media in a transport reactor. The invention tends to dampen fluctuations in the flow of heating media upstream of the pyrolysis zone, and by so doing forms a substantially continuous and substantially uniform annular column of heating media flowing downwardly along the inside diameter of the reactor. The invention is particularly useful for bituminous or agglomerative type coals.

  4. Thermal power measurement apparatus

    International Nuclear Information System (INIS)

    1981-01-01

    Thermal power measurements are important in nuclear power plants, fossil-fuel plants and other closed loop systems such as heat exchangers and chemical reactors. The main object of this invention is to determine the enthalpy of a fluid using only acoustically determined sound speed and correlating the speed with enthalpy. An enthalpy change is measured between two points in the fluid flow: the apparatus is described in detail. (U.K.)

  5. Air-cleaning apparatus

    International Nuclear Information System (INIS)

    Howard, A.G.

    1981-01-01

    An air-cleaning, heat-exchange apparatus includes a main housing portion connected by means of an air inlet fan to the kitchen exhaust stack of a restaurant. The apparatus includes a plurality of heat exchangers through which a heat-absorptive fluid is circulated, simultaneously, by means of a suitable fluid pump. These heat exchangers absorb heat from the hot exhaust gas, out of the exhaust stack of the restaurant, which flows over and through these heat exchangers and transfers this heat to the circulating fluid which communicates with remote heat exchangers. These remote heat exchangers further transfer this heat to a stream of air, such as that from a cold-air return duct for supplementing the conventional heating system of the restaurant. Due to the fact that such hot exhaust gas is heavily grease laden , grease will be deposited on virtually all internal surfaces of the apparatus which this exhaust gas contacts. Consequently, means are provided for spraying these contacted internal surfaces , as well as the hot exhaust gas itself, with a detergent solution in which the grease is soluble, thereby removing grease buildup from these internal surfaces

  6. Dosimeter charging apparatus

    International Nuclear Information System (INIS)

    Reuter, F.A.; Moorman, Ch.J.

    1985-01-01

    An apparatus for charging a dosimeter which has a capacitor connected between first and second electrodes and a movable electrode in a chamber electrically connected to the first electrode. The movable electrode deflects varying amounts depending upon the charge present on said capacitor. The charger apparatus includes first and second charger electrodes couplable to the first and second dosimeter electrodes. To charge the dosimeter, it is urged downwardly into a charging socket on the charger apparatus. The second dosimeter electrode, which is the dosimeter housing, is electrically coupled to the second charger electrode through a conductive ring which is urged upwardly by a spring. As the dosimeter is urged into the socket, the ring moves downwardly, in contact with the second charger electrode. As the dosimeter is further urged downwardly, the first dosimeter electrode and first charger electrode contact one another, and an insulator post carrying the first and second charger electrodes is urged downwardly. Downward movement of the post effects the application of a charging potential between the first and second charger electrodes. After the charging potential has been applied, the dosimeter is moved further into the charging socket against the force of a relatively heavy biasing spring until the dosimeter reaches a mechanical stop in the charging socket

  7. On evaluation of assessments of accruals of future dismantling costs

    Energy Technology Data Exchange (ETDEWEB)

    Labor, Bea [B D Projects 2013, Gdansk (Poland); Lindskog, Staffan [Swedish Radiation Safety Authority, Solna (Sweden)

    2013-07-01

    A major prerequisite in order for civilian commercial nuclear energy production to qualify as sustainable energy production is that systems for the management of the nuclear waste legacy are in operation. These waste types are present in a range from very low short lived waste (VLLW) to long lived high level waste (HLW) (including the used nuclear fuel). The second prerequisite is that financial responsibilities or other constraints must not be passed on to coming generations. The first condition for qualification corresponds to the Polluters Pays Principle (PPP) which demands that the responsibility for the waste management rests solely with the polluter. The second qualification corresponds to the principle of fairness between generations and thus concerns the appropriate distribution of responsibilities between the generations. It is important to note that these two conditions must be met simultaneously, and that compliance with both is a necessary prerequisite in order for commercial use of nuclear power to qualify as a semi-sustainable energy source. Financial and technical planning for dismantling and decommissioning of nuclear installations cannot be regarded as successful unless it rests upon a distinctive way to describe and explain the well-founded values of different groups of stakeholders. This cumbersome task can be underpinned by transparent and easy to grasp models for calculation and estimation of future environmental liabilities. It essential that a systematic classification is done of all types of costs and that an effort is done to evaluate the precision level in the cost estimates. In this paper, a systematic and transparent way to develop a parametric approach that rest upon basic accounting standards is combined with data about younger stakeholder's values towards decommissioning and dismantling of nuclear installation. The former entity rests upon theoretical and practical methods from business administration, whilst the latter is based

  8. On evaluation of assessments of accruals of future dismantling costs

    International Nuclear Information System (INIS)

    Labor, Bea; Lindskog, Staffan

    2013-01-01

    A major prerequisite in order for civilian commercial nuclear energy production to qualify as sustainable energy production is that systems for the management of the nuclear waste legacy are in operation. These waste types are present in a range from very low short lived waste (VLLW) to long lived high level waste (HLW) (including the used nuclear fuel). The second prerequisite is that financial responsibilities or other constraints must not be passed on to coming generations. The first condition for qualification corresponds to the Polluters Pays Principle (PPP) which demands that the responsibility for the waste management rests solely with the polluter. The second qualification corresponds to the principle of fairness between generations and thus concerns the appropriate distribution of responsibilities between the generations. It is important to note that these two conditions must be met simultaneously, and that compliance with both is a necessary prerequisite in order for commercial use of nuclear power to qualify as a semi-sustainable energy source. Financial and technical planning for dismantling and decommissioning of nuclear installations cannot be regarded as successful unless it rests upon a distinctive way to describe and explain the well-founded values of different groups of stakeholders. This cumbersome task can be underpinned by transparent and easy to grasp models for calculation and estimation of future environmental liabilities. It essential that a systematic classification is done of all types of costs and that an effort is done to evaluate the precision level in the cost estimates. In this paper, a systematic and transparent way to develop a parametric approach that rest upon basic accounting standards is combined with data about younger stakeholder's values towards decommissioning and dismantling of nuclear installation. The former entity rests upon theoretical and practical methods from business administration, whilst the latter is based

  9. Present status of refining and conversion facility dismantling. Progress in latter half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-09-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  10. LEAR, shown here dismantled, will live to see another golden era as LEIR starting in 2005.

    CERN Multimedia

    Maximilien Brice

    2004-01-01

    The LEAR (Low Energy Antiproton Ring) experiment has now been dismantled. Only the dipoles remain for use in the future LEIR (Low Energy Ion Ring) experiment, the new ring which will supply lead ions to the LHC experiments.

  11. Deliberated opinion of the Environment Authority concerning the dismantling of the Ulysse reactor (CEA Saclay)

    International Nuclear Information System (INIS)

    2010-01-01

    As the Ulysse reactor of Saclay is about to be dismantled, this report discusses the content of a request made by the CEA to definitely stop and dismantle this reactor. After having recalled the origin of this dismantling project and its regulatory framework, it describes the actual works which are planned, and outlines the main challenges to be faced. It discusses the content of the environmental report or impact study, notably the analysis of the initial condition, the analysis of direct and indirect effects of the project on the environment and health, and of the envisaged measures (waste management, liquid and gaseous effluent management, risk management, radiological exposure of workers in charge of this dismantling, and transports). Recommendations are formulated for a rewriting of the provided documents

  12. Cutting Method of the CAD model of the Nuclear facility for Dismantling Simulation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ikjune; Choi, ByungSeon; Hyun, Dongjun; Jeong, KwanSeong; Kim, GeunHo; Lee, Jonghwan [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    Current methods for process simulation cannot simulate the cutting operation flexibly. As is, to simulate a cutting operation, user needs to prepare the result models of cutting operation based on pre-define cutting path, depth and thickness with respect to a dismantle scenario in advance. And those preparations should be built again as scenario changes. To be, user can change parameters and scenarios dynamically within a simulation configuration process so that the user saves time and efforts to simulate cutting operations. This study presents the methodology of cutting operation which can be applied to all the procedure in the simulation of dismantling of nuclear facilities. We developed the cutting simulation module for cutting operation in the dismantling of the nuclear facilities based on proposed cutting methodology. We defined the requirement of model cutting methodology based on the requirement of the dismantling of nuclear facilities. And we implemented cutting simulation module based on API of the commercial CAD system.

  13. Capsule endoscopy in neoplastic diseases

    Science.gov (United States)

    Pennazio, Marco; Rondonotti, Emanuele; de Franchis, Roberto

    2008-01-01

    Until recently, diagnosis and management of small-bowel tumors were delayed by the difficulty of access to the small bowel and the poor diagnostic capabilities of the available diagnostic techniques. An array of new methods has recently been developed, increasing the possibility of detecting these tumors at an earlier stage. Capsule endoscopy (CE) appears to be an ideal tool to recognize the presence of neoplastic lesions along this organ, since it is non-invasive and enables the entire small bowel to be visualized. High-quality images of the small-bowel mucosa may be captured and small and flat lesions recognized, without exposure to radiation. Recent studies on a large population of patients undergoing CE have reported small-bowel tumor frequency only slightly above that reported in previous surgical series (range, 1.6%-2.4%) and have also confirmed that the main clinical indication to CE in patients with small-bowel tumors is obscure gastrointestinal (GI) bleeding. The majority of tumors identified by CE are malignant; many were unsuspected and not found by other methods. However, it remains difficult to identify pathology and tumor type based on the lesion’s endoscopic appearance. Despite its limitations, CE provides crucial information leading in most cases to changes in subsequent patient management. Whether the use of CE in combination with other new diagnostic (MRI or multidetector CT enterography) and therapeutic (Push-and-pull enteroscopy) techniques will lead to earlier diagnosis and treatment of these neoplasms, ultimately resulting in a survival advantage and in cost savings, remains to be determined through carefully-designed studies. PMID:18785274

  14. Water intake fish diversion apparatus

    International Nuclear Information System (INIS)

    Taft, E.P. III; Cook, T.C.

    1995-01-01

    A fish diversion apparatus uses a plane screen to divert fish for variety of types of water intakes in order to protect fish from injury and death. The apparatus permits selection of a relatively small screen angle, for example ten degrees, to minimize fish injury. The apparatus permits selection of a high water velocity, for example ten feet per second, to maximize power generation efficiency. The apparatus is especially suitable retrofit to existing water intakes. The apparatus is modular to allow use plural modules in parallel to adjust for water flow conditions. The apparatus has a floor, two opposite side walls, and a roof which define a water flow passage and a plane screen within the passage. The screen is oriented to divert fish into a fish bypass which carries fish to a safe discharge location. The dimensions of the floor, walls, and roof are selected to define the dimensions of the passage and to permit selection of the screen angle. The floor is bi-level with a level upstream of the screen and a level beneath screen selected to provide a uniform flow distribution through the screen. The apparatus may include separation walls to provide a water flow channel between the apparatus and the water intake. Lead walls may be used to adjust water flow conditions into the apparatus. The apparatus features stoplog guides near its upstream and downstream ends to permit the water flow passage to be dewatered. 3 figs

  15. Sites with nuclear facilities in the state of dismantling and their future from the public perspective

    International Nuclear Information System (INIS)

    Kretz, Simon Philipp

    2015-01-01

    The thesis on the public perspective at sites of nuclear facility dismantling covers the following issues: the change of German energy landscapes under social and political points of view, theoretical frame of the work, combination of empirical studies and the theoretical approaches in a space concept, action model and hypotheses on the situation and development in communities with nuclear facilities in the state of dismantling, description of the interviewees, and the empirical results of the interviews.

  16. Management system information of characterization of the dismantling project of Jose Cabrera

    International Nuclear Information System (INIS)

    Gimeno Blesa, M. E.; Martin Palomo, N.; Gomez Rodriguez, C. A.

    2011-01-01

    In the proposed dismantling and decommissioning of the Jose Cabrera NPP is designed and implemented a database of physical and radiological inventory, which provides a powerful tool to optimize the storage, monitoring and control of the characterization data. The database is a useful and reliable management system characterization information that facilitates access and information processing, and ensures their integrity and traceability along of the dismantling project.

  17. Parameters of Dismantling Techniques Related to Costs for Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    Jeong, Kwanseong; Moon, Jeikwon; Choi, Byungseon

    2012-01-01

    Reliable cost estimating is one of the most important elements of decommissioning operation. Reliable cost estimating is one of the most important elements of decommissioning planning. Alternative technologies may be evaluated and compared on their efficiency and effectiveness, and measured against a baseline cost as to the feasibility and benefit derived from the technology. This principle ensures that the cost consideration is economically sound and practical for funding. This paper provides a list with basic review of cutting and dismantling techniques, including some typical characteristics if available, as well as aspects of implementation, parameters of cutting and dismantling techniques in decommissioning costing. This paper gives an overview of the principles of the unit factor approach and its implementation in costing in relation to dismantling activities. In general, proper evaluation of decommissioning costs is important for following issues and relevant measures for achieving the listed aspects are: · Selection of a decommissioning strategy and activities: several decommissioning options should be evaluated: · Support to a cost-benefit analysis to ensure that the principle of optimization and reasonably practicable measures are applied: the extent of evaluated decommissioning options should cover all possible scenarios for dismantling activities; · Estimate of required financial resources for the selected strategy: the selected option should involve the dismantling activities in a structure and extent relevant to real procedure of dismantling activities; · Preparation of the project schedule, workforce requirements and phased funding needs: dismantling activities should be structured according to the tasks of the decommissioning schedule; · Definition of measures for proper management and maintenance of resources for safe and timely decommissioning: the time distribution and safety related parameters of dismantling activities should be known

  18. Method of processing dismantled products of radiation-contaminated equipments and transportation container therefor

    International Nuclear Information System (INIS)

    Komura, Shiro; Heki, Hideaki.

    1991-01-01

    In a method of decontaminating dismantled products of radiation-contaminated equipments removed at nuclear power facilities and classifying the dismantled products depending on their remaining radioactivity levels measured at a processing facility, the dismantled products are contained in a transportation container, to which decontamination liquids are injected and they are transferred to the processing facility. The decontaminated liquid wastes are drained from the transportation container, the dismantled products are washed while being contained in the transportation container as they are. Then, they are transferred to a step for measuring their remaining radioactivity level. This can shorten the time from the containment of the dismantled products to the transportation container to the completion of the decontamination, to improve the efficiency for the decontamination processing. Further, by separately containing the dismantled products on every kind of materials to respective containers, the processing time can be appropriately controlled respectively even if the dissolving efficiency to the decontamination liquids is different depending on the materials. (T.M.)

  19. DIRECT DISMANTLING OF REPROCESSING PLANT CELLS THE EUREX PLANT EXPERIENCEe2d12c

    International Nuclear Information System (INIS)

    Gili, M.; Troiani, F.; Risoluti, P.

    2003-01-01

    After finishing the reprocessing campaigns in 1970-1983, the EUREX pilot reprocessing plant of ENEA Saluggia Research Center started into a new phase, aiming to materials and irradiated fuel systemation and radioactive wastes conditioning. In 1997 the project ''CORA'' for a vitrification plant for the high and intermediate liquid radioactive wastes started. The ''CORA'' plant will be hosted in some dismantled cells of the EUREX plant, reusing many of the EUREX plant auxiliary systems, duly refurbished, saving money and construction time and avoiding a new nuclear building in the site. Two of the cells that will be reused were part of the EUREX chemical process (solvent recovery and 2nd extraction cycle) and the components were obviously internally contaminated. In 2000 the direct (hands-on) dismantling of one of them started and has been completed in summer 2002; the second one will be dismantled in the next year and then the ''CORA'' plant will be assembled inside the cells. Special care w as taken to avoid spread of contamination in the cells, where ''CORA'' installation activities will start in the next years, during the dismantling process The analysis of data and results collected during the dismantling of the first cell shows that direct dismantling can be achieved with careful choice of tools, procedures and techniques, to reduce volumes of wastes to be disposed and radiological burden

  20. The Blue Lady Case and the International Issue of Ship Dismantling - Comment

    Directory of Open Access Journals (Sweden)

    Florent Pelsy

    2008-09-01

    Full Text Available This paper focuses on the decision of the Supreme Court of India to allow the dismantling of the Blue Lady (ex France in Alang. The first part underlines that the Supreme Court of India is prioritising the commercial interest of the dismantling companies over the social and environmental concerns of the workers and the communities living in Alang. It argues that such decision goes against its 2003 judgement on ship-dismantling. It then demonstrates that the Supreme Court of India is distorting the concept of sustainable development. The second part analyses the Blue Lady case from an international perspective since most of the ships that are dismantled in India come from developed countries. It provides an overview of the Basel Convention on ship dismantling issues and a study of the Clemenceau case before the French Conseil d'Etat. It then concludes that a better control of end-of-life ships in OECD countries and a new international convention on ship-dismantling would be necessary in order to prevent environmental and social disasters in Alang.

  1. Dismantling, conditioning and repatriation of disused sealed radioactive sources

    International Nuclear Information System (INIS)

    Aguilar, S.L.; Miranda, C.A.; Saire, A.E.; Ontiveros, G.P.

    2015-01-01

    In Bolivia sealed radioactive sources for medical, industrial and research applications are used; radioactive sources containing a wide range of radionuclides and have different levels of activity and half-lives, they generated a problem when they stop being used. At the end of its useful life these sources are considered obsolete. However, residual levels of radioactivity, which have these sources can be high constituting a potential hazard to personnel and applies to those who benefit from its use and the general public. The aim of this work has been focused mainly on safety issues in the safe handling and management of disused sealed sources. Assignments listed below: 1. Dismantling; 2. Packaging; 3. Return of disused sealed radioactive sources. The actions taken were carried out by the technical teams of the Bolivian Institute of Nuclear Science and Technology (IBTEN) and Los Alamos National Laboratory (LANS) which supports the program 'Global Threat Reduction Initiative's' (GTRI) in the implementation of 'Off -site Source Recovery Program' (OSRP). [es

  2. Disposition of excess weapons plutonium from dismantled weapons

    International Nuclear Information System (INIS)

    Jardine, L.J.

    1997-01-01

    With the end of the Cold War and the implementation of various nuclear arms reduction agreements, US and Russia have been actively dismantling tens of thousands of nuclear weapons. As a result,large quantities of fissile materials, including more than 100 (tonnes?) of weapons-grade Pu, have become excess to both countries' military needs. To meet nonproliferation goals and to ensure the irreversibility of nuclear arms reductions, this excess weapons Pu must be placed in secure storage and then, in timely manner, either used in nuclear reactors as fuel or discarded in geologic repositories as solid waste. This disposition in US and Russia must be accomplished in a safe, secure manner and as quickly as practical. Storage of this Pu is a prerequisite to any disposition process, but the length of storage time is unknown. Whether by use as fuel or discard as solid waste, disposition of that amount of Pu will require decades--and perhaps longer, if disposition operations encounter delays. Neither US nor Russia believes that long-term secure storage is a substitute for timely disposition of excess Pu, but long-term, safe, secure storage is a critical element of all excess Pu disposition activities

  3. Disposal of fissionable material from dismantled nuclear weapons

    International Nuclear Information System (INIS)

    Taylor, J.J.

    1991-01-01

    The reduction in tensions between the United States and the Soviet Union has improved the prospects for nuclear disarmament, making it more likely that significant numbers of nuclear warheads will be dismantled by the United States and USSR in the foreseeable future. Thus, the question becomes more urgent as to the disposition of the weapons materials, highly enriched uranium and plutonium. It is timely, therefore, to develop specific plans for such disposal. The overall process for disposal of weapons materials by the burnup option involves the following steps: (1) removing the weapons material from the warheads, (2) converting the material to a fuel form suitable for power reactors, (3) burning it up as a power reactor fuel, and (4) removing the spent fuel and placing it in a permanent repository. This paper examines these four steps with the purpose of answering the following questions. What facilities would be appropriate for the disposal process? Do they need to be dedicated facilities, or could industrial facilities be used? What is the present projection of the economics of the burnup process, both the capital investment and the operating costs? How does one assure that fissionable materials will not be diverted to military use during the disposal process? Is the spent fuel remaining from the burnup process proliferation resistant? Would the disposal of spent fuel add an additional burden to the spent fuel permanent repository? The suggested answers are those of the author and do not represent a position by the Electric Power Research Institute

  4. Rosie: A mobile worksystem for decontamination and dismantlement operations

    International Nuclear Information System (INIS)

    Thompson, B.R.; Conley, L.

    1996-01-01

    RedZone Robotics, Inc. and Carnegie Mellon University's Field Robotics Center have undertaken a contract to develop a next-generation worksystem for decommissioning and dismantlement tasks in Department of Energy (DOE) facilities. Currently, the authors are closing the second phase of this three phase effort and have completed the design and fabrication of the worksystem: Rosie. Rosie includes a locomotor, heavy manipulator, control center, and control system for robot operation. The locomotor is an omni-directional platform with tether management and hydraulic power capabilities. The heavy manipulator is a high-payload, long-reach system intended to deploy tools into the work area. The heavy manipulator is capable of deploying systems such as the Dual-Arm Work Module--a five degree-of-freedom platform supporting two highly dexterous manipulators--or a single manipulator for performing simpler, less dexterous tasks. Rosie is telerobotic to the point of having servo-controlled motions which can be operated and coordinated through the control center

  5. Gaukang and White Coup: Dismantling of Traditional Power

    Directory of Open Access Journals (Sweden)

    Nila Sastrawati

    2017-12-01

    Full Text Available This paper discusses the concept of power adhered to by the South Sulawesi community and explains the power struggle which had occurred both in the past and present. The South Sulawesi community’s conceptiontraditional power on power signifies a strong, transcendental relationship between themselves and supernatural powers, wherein all objects possessing certain peculiarities are inseparable from the stable and unchanging cosmic world. Thus, gaukang holds a significant position in the life of the South Sulawesi community, particularly pertaining to matters of power struggle. The waxing and waning of traditional power in South Sulawesi is determined by at least three factors: firstly, a change in power patterns with the emergence of new elites having a commoner background; secondly, incessant resistance to feudalistic rule; and lastly, the application of modern bureaucratic model. The general conclusion of this paper emphasizes the position of gaukang as a central point affecting the various power struggles that occurred throughout the history of the South Sulawesi community. The enactment of Regional Regulation (Perda No. 5 year 2016 on the Organization of Gowa Regency Local Cultural and Customary Institution provides a peek at how bureaucratic power had dismantled traditional power in Gowa Regency, which included, consequently, the transfer of authority over the royal heirlooms or gaukang of the Gowa Kingdom.

  6. Treatment of concrete bars from the dismantling of hot cells

    International Nuclear Information System (INIS)

    Graf, A.; Stutz, U.; Valencia, L.

    2002-01-01

    The Central Decontamination Operations Department (HDB) of the Karlsruhe Research Center operates facilities for the disposal of radioactive waste. In general, their objective is to decontaminate radioactive residues for unrestricted release in order to minimize the volume of waste products suitable for repository storage. In the case of about 120 concrete bars from the dismantling of hot cells, we reduce the volume of radioactive waste by sawing off the most contaminated parts of the bar. If there are no insertions such as cables or ventilation systems, the rest of the bar is sandblasted and its activity manually measured to ensure compliance with the release criteria. Otherwise, the bar is minced into small pieces by a power shovel. Afterwards, the rubble is filled into drums and its activity is measured by the clearance measurement facility. If the rubble and the sandblasted bars do not exceed the activity limit specified by the release criteria, the material is disposed of without further regulations for unrestricted use. Those parts of the bars which can not be released must be stored in special containers suitable for the KONRAD final disposal. Using this method, about 70 % of the total mass can be released. (author)

  7. Rosie: A mobile workstation for decontamination and dismantlement operations

    International Nuclear Information System (INIS)

    1994-01-01

    RedZone Robotics, Inc. and Carnegie Mellon University's Field Robotics Center have undertaken a contract to develop a next-generation worksystem for decommissioning and dismantlement tasks in Department of Energy (DOE) facilities. Currently, the authors are in the second phase of this three phase effort and are completing the design of the worksystem. Within this project RedZone is designing and fabricating a worksystem: Rosie. Rosie will include a locomotor, heavy manipulator, control center, and control system for robot operation. The locomotor is an omni-directional platform with tether management and hydraulic power capabilities. The heavy manipulator is a high-payload, long-reach system to deploy tools into the work area. The heavy manipulator will be capable of deploying systems such as the Dual-Arm Work Module--a five degree-of-freedom platform supporting two highly dexterous manipulators--or a single manipulator for performing simpler, less dexterous tasks. Rosie will be telerobotic to the point of having servo-controlled motions which can be operated and coordinated through the control center. This report describes the design of the systems. In phase three Rosie will be radiation-hardened and perform a demonstration in a contaminated facility

  8. From dismantling to current scenario in Galician mano commun mountains

    Directory of Open Access Journals (Sweden)

    Francisco García Quiroga

    2013-03-01

    Full Text Available Common mountains are, like seeds, folklore or free software, good examples of commons. They all count on a community to autonomously manage a good in a collaborative manner by establishing rules to guarantee its sustainability. Common mountains in Galicia represent a property modality and goods management breaking the classic dichotomy of pubic against private, by introducing a collective property alternative. The specificity of these mountains is determined by the fact that the holders of the property right are the regular inhabitants of the land; besides, it is important to stress how these communities have been able to create the rules to guarantee the sustainability of this good. Despite the inherent importance of this modality of commons, a process of dismantling has taken place for a long time with the goal of privatizing these goals. This process was reflected in the shortening of the area of these 18.000 mountains from between 1.8 and 2 millions of hectares in Galicia to the current 640.000 hectares. With the analysis of the commons we can understand how communities can assume co responsibility in the sustainability of goods and how this modality is perfectly viable. The study of these goods brings us closer to the idea of new models in social relations and mutual support networks are possible.

  9. Dismantling method for reactor pressure vessel and system therefor

    International Nuclear Information System (INIS)

    Hayashi, Makoto; Enomoto, Kunio; Kurosawa, Koichi; Saito, Hideyo.

    1994-01-01

    Upon dismantling of a reactor pressure vessel, a containment building made of concretes is disposed underground and a spent pressure vessel is contained therein, and incore structures are contained in the spent pressure vessel. Further, a plasma-welder and a pressing machine are disposed to a pool for provisionally placing reactor equipments in the reactor building for devoluming the incore structures by welding and compression. An overhead-running crane and rails therefor are disposed on the roof and the outer side of the reactor building for transporting the pressure vessel from the reactor building to the containment building. They may be contained in the containment building after incorporation of the incore structures into the pressure vessel at the outside of the reactor building. For the devoluming treatment, a combination of cutting, welding, pressing and the like are optically conducted. A nuclear power plant can be installed by using a newly manufactured nuclear reactor, with no requirement for a new site and it is unnecessary to provide a new radioactive waste containing facility. (N.H.)

  10. Management of wastes from dismantled nuclear power plants

    International Nuclear Information System (INIS)

    1979-01-01

    The problems associated with the management of radioactive wastes encountered in the dismantling of a 1200MWe PWR reactor are considered. It is possible to extend all the conclusions reached in these studies to BWR's or other reactors of the same type using light water as a coolant and moderator. The studies performed established the specific characteristics of these wastes: a gamma activity due essentially to 60 Co (after some fifty years this radioisotope will have decayed sufficiently to enable it to be stored without shielding); the presence of 63 Ni and 59 Ni (these long half-life beta emitting radioisotopes need to be stored over a long or even indefinite period of time); contaminated components (60% of the overall wastes), the reselling of these components involving costly decontamination processes. Extensive studies have been conducted on the management and handling of these wastes: packaging, transport, processing, storage and a great many techniques have been developed. However, further developments in concentration methods (fusion, crushing, cryogenics etc) and the selection of storage sites for this type of waste are necessary. Depending on the solutions chosen, the global cost of the wastes coming from a 1200 MW PWR reactor can vary between 10 and 20 million BFR

  11. Informationization nuclear apparatus communication technique

    International Nuclear Information System (INIS)

    Yu Tiqi; Fang Zongliang; Wen Qilin

    2006-01-01

    The paper explains the request of communication ability in nuclear technique application area. Based on the actuality of nuclear apparatus communication ability, and mainly combining with the development of communication technique, the authors analyzes the application trend of communication technique applying in nuclear apparatus, for the apparatus and system needing communication ability, they need selecting suitable communication means to make them accomplish the task immediately and effectively. (authors)

  12. Thermal stir welding apparatus

    Science.gov (United States)

    Ding, R. Jeffrey (Inventor)

    2011-01-01

    A welding method and apparatus are provided for forming a weld joint between first and second elements of a workpiece. The method includes heating the first and second elements to form an interface of material in a plasticized or melted state interface between the elements. The interface material is then allowed to cool to a plasticized state if previously in a melted state. The interface material, while in the plasticized state, is then mixed, for example, using a grinding/extruding process, to remove any dendritic-type weld microstructures introduced into the interface material during the heating process.

  13. Magnetic resonance imaging apparatus

    International Nuclear Information System (INIS)

    Ehnholm, G.J.

    1991-01-01

    This patent describes an electron spin resonance enhanced magnetic resonance (MR) imaging (ESREMRI) apparatus able to generate a primary magnetic field during periods of nuclear spin transition excitation and magnetic resonance signal detection. This allows the generation of ESREMRI images of a subject. A primary magnetic field of a second and higher value generated during periods of nuclear spin transition excitation and magnetic resonance signal detection can be used to generate conventional MR images of a subject. The ESREMRI and native MR images so generated may be combined, (or superimposed). (author)

  14. Improvements in radiological apparatus

    International Nuclear Information System (INIS)

    Grady, J.K.

    1985-01-01

    Improvements in radiological apparatus are described which allow better unilateral access to the patient. A base mounts ring supports for rotation about an axis and a table for supporting a subject is fitted to the ring support. An X-ray tube and receptor are held on opposite ends of a two-limbed carriage and radiation axis. The carriage is mounted on a sliding arm carried on the ring support and extending parallel to the rotational axis of the support. The carriage also pivots on the arm about an axis perpendicular to the rotational axis and to the radiation axis. (author)

  15. Tomographic scanning apparatus

    International Nuclear Information System (INIS)

    Abele, M.

    1983-01-01

    A computerized tomographic scanning apparatus suitable for diagnosis and for improving target identification in stereotactic neurosurgery is described. It consists of a base, a source of penetrating energy, a detector which produces scanning signals and detector positioning means. A frame with top and bottom arms secures the detector and source to the top and bottom arms respectively. A drive mechanism rotates the frame about an axis along which the frame may also be moved. Finally, the detector may be moved relative to the bottom arm in a direction contrary to the rotation of the frame. (U.K.)

  16. Control rod testing apparatus

    International Nuclear Information System (INIS)

    Gaunt, R.R.; Ashman, C.M.

    1987-01-01

    A control rod testing apparatus is described comprising: a first guide means having a vertical cylindrical opening for grossly guiding a control rod; a second guide means having a vertical cylindrical opening for grossly guiding a control rod. The first and second guide means are supported at axially spaced locations with the openings coaxial; and a substantially cylindrical subassembly having a vertical cylindrical opening therethrough. The subassembly is trapped coaxial with and between the first and second guide means, and the subassembly radially floats with respect to the first and second guide means

  17. Apparatus for chemical synthesis

    Science.gov (United States)

    Kong, Peter C [Idaho Falls, ID; Herring, J Stephen [Idaho Falls, ID; Grandy, Jon D [Idaho Falls, ID

    2011-05-10

    A method and apparatus for forming a chemical hydride is described and which includes a pseudo-plasma-electrolysis reactor which is operable to receive a solution capable of forming a chemical hydride and which further includes a cathode and a movable anode, and wherein the anode is moved into and out of fluidic, ohmic electrical contact with the solution capable of forming a chemical hydride and which further, when energized produces an oxygen plasma which facilitates the formation of a chemical hydride in the solution.

  18. The ATHENA Antihydrogen Apparatus

    CERN Document Server

    Amoretti, M; Bonomi, G; Bouchta, A; Bowe, P; Carraro, C; Charlton, M; Collier, M; Doser, Michael; Filippini, V; Fine, K S; Fontana, A; Fujiwara, M C; Funakoshi, R; Genova, P; Glauser, A; Grögler, D; Hangst, Jeffrey S; Hayano, R S; Higaki, H; Holzscheiter, Michael H; Joffrain, W; Jørgensen, L V; Lagomarsino, V; Landua, Rolf; Cesar, C L; Lindelöf, D; Lodi-Rizzini, E; Macri, M; Madsen, N; Manuzio, D; Manuzio, G; Marchesotti, M; Montagna, P; Pruys, H S; Regenfus, C; Riedler, P; Rochet, J; Rotondi, A; Rouleau, G; Testera, G; Van der Werf, D P; Variola, A; Watson, T L; Yamazaki, T; Yamazaki, Y

    2004-01-01

    The ATHENA apparatus that recently produced and detected the first cold antihydrogen atoms is described. Its main features, which are described herein, are: an external positron accumulator, making it possible to accumulate large numbers of positrons; a separate antiproton catching trap, optimizing the catching, colling and handling of antiprotons: a unique high resolution antihydrogen annihilation detector, allowing a clear determination that antihydrogen has been produced; an open, modular design making variations in the experimental approach possible and a "nested" Penning trap situated in a cryogenic, 3T magnetic field environment used for the mixing of the antiprotons and positrons.

  19. Isotope diagnostics apparatus

    International Nuclear Information System (INIS)

    Herrschaft, H.

    1976-01-01

    The invention relates to a measuring probe for an isotope diagnostics apparatus to determine the distribution of radioactive substances in a body by measuring the radiation emanating from this body by means of a multiplicity of measuring probes directed simultaneously towards areas of measuring surfae and carried in guidances of a holding block. The measuring results of the individual probes are recorded separately, thus allowing the possibility of being evaluated separately, too. Measuring probes of this kind are used in multi-channel measuring objects and are useful particularly for determining the regional cerebral blood flow. (orig./ORU) [de

  20. X-ray apparatus

    International Nuclear Information System (INIS)

    Grady, J.K.

    1985-01-01

    X-ray apparatus is described which has a shutter between the X-ray source and the patient. The shutter controls the level of radiation to which the patient is exposed instead of merely discontinuing the electric power supplied to the source. When the shutter is opened a radiation sensor senses the level of X-radiation. When a preset quantity of X-radiation has been measured an exposure control closes the shutter. Instead of using the radiation sensor, the integrated power supplied to the anode of the X-ray source may be measured. (author)

  1. Remote docking apparatus

    International Nuclear Information System (INIS)

    Dent, T.H.; Sumpman, W.C.; Wilhelm, J.J.

    1981-01-01

    The remote docking apparatus comprises a support plate with locking devices mounted thereon. The locking devices are capable of being inserted into tubular members for suspending the support plate therefrom. A vertical member is attached to the support plate with an attachment mechanism attached to the vertical member. A remote access manipulator is capable of being attached to the attachment mechanism so that the vertical member can position the remote access manipulator so that the remote access manipulator can be initially attached to the tubular members in a well defined manner

  2. Borehole sealing method and apparatus

    International Nuclear Information System (INIS)

    Hartley, J.N.; Jansen, G. Jr.

    1977-01-01

    A method and apparatus is described for sealing boreholes in the earth. The borehole is blocked at the sealing level, and a sealing apparatus capable of melting rock and earth is positioned in the borehole just above seal level. The apparatus is heated to rock-melting temperature and powdered rock or other sealing material is transported down the borehole to the apparatus where it is melted, pooling on the mechanical block and allowed to cool and solidify, sealing the hole. Any length of the borehole can be sealed by slowly raising the apparatus in the borehole while continuously supplying powdered rock to the apparatus to be melted and added to the top of the column of molten and cooling rock, forming a continuous borehole seal. The sealing apparatus consists of a heater capable of melting rock, including means for supplying power to the heater, means for transporting powdered rock down the borehole to the heater, means for cooling the apparatus and means for positioning the apparatus in the borehole. 5 claims, 1 figure

  3. Apparatus for gamma ray radiography

    International Nuclear Information System (INIS)

    Kobayashi, Masatoshi; Enomoto, Shigemasa; Oga, Hiroshi

    1979-01-01

    This is the standard of Japan Non-Destructive Inspection Society, NDIS 1101-79, which stipulates on the design, construction and testing method of the apparatuses for gamma ray radiography used for taking industrial radiograms. The gamma ray apparatuses stipulated in this standard are those containing sealed radioactive isotopes exceeding 100 μCi, which emit gamma ray. The gamma ray apparatuses are classified into three groups according to their movability. The general design conditions, the irradiation dose rate and the sealed radiation sources for the gamma ray apparatuses are stipulated. The construction of the gamma ray apparatuses must be in accordance with the notification No. 52 of the Ministry of Labor, and safety devices and collimators must be equipped. The main bodies of the gamma ray apparatuses must pass the vibration test, penetration test, impact test and shielding efficiency test. The method of each test is described. The attached equipments must be also tested. The tests according to this standard are carried out by the makers of the apparatuses. The test records must be made when the apparatuses have passed the tests, and the test certificates are attached. The limit of guarantee by the endurance test must be clearly shown. The items to be shown on the apparatuses are stipulated. (Kako, I.)

  4. Development of Multiple Capsule Robots in Pipe

    Directory of Open Access Journals (Sweden)

    Shuxiang Guo

    2018-05-01

    Full Text Available Swallowable capsule robots which travel in body cavities to implement drug delivery, minimally invasive surgery, and diagnosis have provided great potential for medical applications. However, the space constraints of the internal environment and the size limitations of the robots are great challenges to practical application. To address the fundamental challenges of narrow body cavities, a different-frequency driven approach for multiple capsule robots with screw structure manipulated by external electromagnetic field is proposed in this paper. The multiple capsule robots are composed of driven permanent magnets, joint permanent magnets, and a screw body. The screw body generates a propulsive force in a fluidic environment. Moreover, robots can form new constructions via mutual docking and release. To provide manipulation guidelines for active locomotion, a dynamic model of axial propulsion and circumferential torque is established. The multiple start and step-out frequencies for multiple robots are defined theoretically. Moreover, the different-frequency driven approach based on geometrical parameters of screw structure and the overlap angles of magnetic polarities is proposed to drive multiple robots in an identical electromagnetic field. Finally, two capsule robots were prototyped and experiments in a narrow pipe were conducted to verify the different motions such as docking, release, and cooperative locomotion. The experimental results demonstrated the validity of the driven approach for multiple capsule robots in narrow body cavities.

  5. Scaling effects in spiral capsule robots.

    Science.gov (United States)

    Liang, Liang; Hu, Rong; Chen, Bai; Tang, Yong; Xu, Yan

    2017-04-01

    Spiral capsule robots can be applied to human gastrointestinal tracts and blood vessels. Because of significant variations in the sizes of the inner diameters of the intestines as well as blood vessels, this research has been unable to meet the requirements for medical applications. By applying the fluid dynamic equations, using the computational fluid dynamics method, to a robot axial length ranging from 10 -5 to 10 -2  m, the operational performance indicators (axial driving force, load torque, and maximum fluid pressure on the pipe wall) of the spiral capsule robot and the fluid turbulent intensity around the robot spiral surfaces was numerically calculated in a straight rigid pipe filled with fluid. The reasonableness and validity of the calculation method adopted in this study were verified by the consistency of the calculated values by the computational fluid dynamics method and the experimental values from a relevant literature. The results show that the greater the fluid turbulent intensity, the greater the impact of the fluid turbulence on the driving performance of the spiral capsule robot and the higher the energy consumption of the robot. For the same level of size of the robot, the axial driving force, the load torque, and the maximum fluid pressure on the pipe wall of the outer spiral robot were larger than those of the inner spiral robot. For different requirements of the operating environment, we can choose a certain kind of spiral capsule robot. This study provides a theoretical foundation for spiral capsule robots.

  6. Decommissioning of nuclear facilities: COGEMA expertise devoted to UP1 reprocessing plant dismantling programme

    International Nuclear Information System (INIS)

    Gay, A.

    2001-01-01

    Over the last past decades, the French nuclear industry has acquired a great experience and know-how in the field of dismantling. Today this experience amounts to more than 200,000 hours. The fundamental aims within dismantling strategy are the same as for all nuclear facilities: minimising doses received by workers, minimising waste volume and adapting waste management to radioactivity levels, minimising costs. French experience is based on technologies which are currently used in nuclear maintenance facilities. Dismantling is a dynamic process especially in the field of decontamination (chemical and mechanical), cleaning, robotics and remote control operations. The strategy for the dismantling of former UP1 reprocessing plant is based on the feedback of experience gained through the dismantling of other facilities such as the AT1 workshop at La Hague. This workshop, a pilot plant for reprocessing of fast-breeder reactor fuels (Rapsodie and Phenix) has to be dismantled to IAEA level 3 (unrestricted site use), excluding civil works structures. Currently conducted by trained shifts, this dismantling project should end in 1999. The experience already acquired proves that chemical rinsings with the use of specific reagents is sufficient to decontaminate the hot cells and that the use of remote operations or robotics is not as important as previously envisaged. The UP1 reprocessing plant of Marcoule operated from 1958 to 1997. End of the operation was pronounced on the 31st of December 1997. 20,000 tons of spent fuels were reprocessed at UP1. The cleaning and dismantling operations at the Marcoule site depend upon the CEA, EDF and COGEMA. The Defence and Industry Ministries asked for a specific structure to be set up. An economic interest group called CODEM was created in May 1996. CODEM decides, finances and supervises dismantling operations, while respecting the constraints of nuclear safety, environmental protection and cost-effectiveness. The cleaning operations of

  7. Isotope separation apparatus

    International Nuclear Information System (INIS)

    Lyon, R.K.; Eisner, P.N.; Thomas, W.R.I.

    1983-01-01

    This application discloses a method for and an apparatus in which isotopes of an element in a compared are separated from each other while that compound, i.e., including a mixture of such isotopes, flows along a predetermined path. The apparatus includes a flow tube having a beginning and an end. The mixture of isotopes is introduced into the flow tube at a first introduction point between the beginning and the end thereof to flow the mixture toward the end thereof. A laser irradiates the flow tube dissociating compounds of a preselected one of said isotopes thereby converting the mixture in an isotopically selective manner. The dissociation products are removed from the tube at a first removal point between the first introduction point and the end. The dissociation product removed at the the first removal point are reconverted back into the comound thereby providing a first stage enriched compound. This first stage enriched compound is reintroduced into the flow tube at a second introduction point between the beginning thereof and the first introduction point. Further product is removed from the flow tube at a second removal point between the second introduction point and the first introduction point. The second introduction point is chosen so that the isotope composition of the first stage enriched compound is approximately the same as that of the compound in the flow tube

  8. Apparatus for fuel replacement

    International Nuclear Information System (INIS)

    Imada, Takahiko.

    1974-01-01

    Object: To support a telescope mast such that no deforming load is applied to it even during massive vibration, it is held fixed at the time of fuel replacement to permit satisfactory remote control operation by automatic operation. Structure: The body of the fuel replacement apparatus is provided with telescope mast fixing means comprising a slide base supported for reciprocal movement with respect to a telescope mast, an operating arm pivoted at the slide base, a wrist member mounted on the free end of the operating arm and an engagement member for restricting the slide base and operating arm at the time of loading and unloading the fuel. When loading and unloading the fuel, the slide base and operating arm are restrained by the engagement member to reliably restrict the vibration of the telescope mast. When the fuel replacement apparatus is moved, the means provided on the operating arm is smoothly displaced to follow the swing (vibration) of the telescope mast to prevent the deforming load from being applied to the support portion or other areas. The wrist member supports the telescope mast such that it can be rotated while restraining movement in the axial direction, and it is provided with revolution drive means for rotating the telescope mast under remote control. (Kamimura, M.)

  9. Radiographic scanner apparatus

    International Nuclear Information System (INIS)

    Wake, R.H.

    1980-01-01

    The preferred embodiment of this invention includes a hardware system, or processing means, which operates faster than software. Moreover the computer needed is less expensive and smaller. Radiographic scanner apparatus is described for measuring the intensity of radiation after passage through a planar region and for reconstructing a representation of the attenuation of radiation by the medium. There is a source which can be rotated, and detectors, the output from which forms a data line. The detectors are disposed opposite the planar region from the source to produce a succession of data lines corresponding to the succession of angular orientations of the source. There is a convolver means for convolving each of these data lines, with a filter function, and a means of processing the convolved data lines to create the representation of the radiation attenuation in the planar region. There is also apparatus to generate a succession of data lines indicating radiation attenuation along a determinable path with convolver means. (U.K.)

  10. Apparatus for gamma radiography

    International Nuclear Information System (INIS)

    1983-06-01

    The aim of the present standard is to fix the rules for the construction of gamma radiography instrumentation without prejudice to the present regulations. These apparatus have to be fitted with only sealed sources conformable to the experimental standard M 61-002. The present standard agrees with the international standard ISO 3999 of 1977 dealing with the same subject. Nevertheless, it is different on the three main following points: it does not accept the same limits of absorbed dose rates in the air calculated on the external surface of projectors; it precribes tightness, bending, crushing and tensile tests for some components of the gamma radiography it prescribes tests of endurance and resistance to breaking for the locking systems of the gamma radiography apparatus. The present standard also specifies the following points: symbols and indications to put on projectors and on the source-holder; identification of the source contained in the projector; and, accompanying documents. The regulation references are given in annexe [fr

  11. Fuel exchanging apparatus

    International Nuclear Information System (INIS)

    Imada, Takahiko; Sato, Hideo.

    1975-01-01

    Object: To provide a centripetal device, which has an initial spring force greater than a frictional force in an oscillating direction of a telescope mast, on a mast fixing device mounted on a body of fuel exchanging apparatus so that the telescope mast may be secured quickly returning to a predetermined initial position. Structure: When the body of fuel exchanging apparatus is stopped at a predetermined position, a tension spring, which has an initial spring force greater than a frictional force in an oscillating direction of the telescope mast, causes a lug to be forced by means of a push rod to position a sliding base plate to its original position. At the same time, a device of similar structure causes an operating arm to be positioned to the original position, and a lock pin urged by a cylinder is inserted into a through hole in the sliding base plate and operating arm so that the telescope mast may be fixed and retained. (Hanada, M.)

  12. The first capsule implosion experiments on Orion

    International Nuclear Information System (INIS)

    Garbett, W J; Horsfield, C J; Gales, S G; Leatherland, A E; Rubery, M S; Coltman, J E; Meadowcroft, A E; Rice, S J; Simons, A J; Woolhead, V E

    2016-01-01

    Direct drive capsule implosions are being developed on the Orion laser at AWE as a platform for ICF and HED physics experiments. The Orion facility combines both long pulse and short-pulse beams, making it well suited for studying the physics of alternative ignition approaches. Orion implosions also provide the opportunity to study aspects of polar direct drive. Limitations on drive symmetry from the relatively small number of laser beams makes predictive modelling of the implosions challenging, resulting in some uncertainty in the expected capsule performance. Initial experiments have been fielded to evaluate baseline capsule performance and inform future design optimization. Highly promising DD fusion neutron yields in excess of 10 9 have been recorded. Results from the experiments are presented alongside radiation-hydrocode modelling. (paper)

  13. Capsule endoscopy—A mechatronics perspective

    Science.gov (United States)

    Lin, Lin; Rasouli, Mahdi; Kencana, Andy Prima; Tan, Su Lim; Wong, Kai Juan; Ho, Khek Yu; Phee, Soo Jay

    2011-03-01

    The recent advances in integrated circuit technology, wireless communication, and sensor technology have opened the door for development of miniature medical devices that can be used for enhanced monitoring and treatment of medical conditions. Wireless capsule endoscopy is one of such medical devices that has gained significant attention during the past few years. It is envisaged that future wireless capsule endoscopies replace traditional endoscopy procedures by providing advanced functionalities such as active locomotion, body fluid/tissue sampling, and drug delivery. Development of energy-efficient miniaturized actuation mechanisms is a key step toward achieving this goal. Here, we review some of the actuators that could be integrated into future wireless capsules and discuss the existing challenges.

  14. Production of 131I gelatin capsules

    International Nuclear Information System (INIS)

    Freud, A.; Hirshfeld, N.; Canfi, A.; Melamud, Y.

    1997-01-01

    Radioiodine ( 131 I) hard-gelatin capsules are widely used for the diagnosis and treatment of various thyroid disorders. Until 1980 radioiodine was supplied by us as a liquid dosage. This proved to be a rather inconvenient form since it resulted in inaccurate dosing by the physicians and caused frequent contamination of the patients and the hospital personnel. In an attempt to overcome these problems we have designed and constructed a production facility for capsules in which 1311 is packaged. Because of the extreme precautions necessary in handling radioactive compounds, encapsulation of radioactive materials requires specifically designed production techniques, special instrumentation and unique quality control procedures that are not encountered in the standard capsule production processes in the pharmaceutical industry

  15. Chord length distribution for a compound capsule

    International Nuclear Information System (INIS)

    Pitřík, Pavel

    2017-01-01

    Chord length distribution is a factor important in the calculation of ionisation chamber responses. This article describes Monte Carlo calculations of the chord length distribution for a non-convex compound capsule. A Monte Carlo code was set up for generation of random chords and calculation of their lengths based on the input number of generations and cavity dimensions. The code was written in JavaScript and can be executed in the majority of HTML viewers. The plot of occurrence of cords of different lengths has 3 peaks. It was found that the compound capsule cavity cannot be simply replaced with a spherical cavity of a triangular design. Furthermore, the compound capsule cavity is directionally dependent, which must be taken into account in calculations involving non-isotropic fields of primary particles in the beam, unless equilibrium of the secondary charged particles is attained. (orig.)

  16. Topical Session on the Decommissioning and Dismantling Safety Case

    International Nuclear Information System (INIS)

    2002-01-01

    Set up by the Radioactive Waste Management Committee (RWMC), the WPDD brings together senior representatives of national organisations who have a broad overview of Decommissioning and Dismantling (D and D) issues through their work as regulators, implementers, R and D experts or policy makers. These include representatives from regulatory authorities, industrial decommissioners from the NEA Cooperative Programme on Exchange of Scientific and Technical Information on Nuclear Installation Decommissioning Projects (CPD), and cross-representation from the NEA Committee on Nuclear Regulatory Activities, the Committee on Radiation Protection and Public Health, and the RWMC. The EC is a member of the WPDD and the IAEA also participates. This ensures co-ordination amongst activities in these international programmes. Participation from civil society organisations is considered on a case by case basis, and has already taken place through the active involvement of the Group of Municipalities with Nuclear Installations at the first meeting of the WPDD At its second meeting, in Paris, 5-7 December 2001, the WPDD held two topical sessions on the D and D Safety Case and on the Management of Materials from D and D, respectively. This report documents the topical session on the safety case. The topical session was meant to provide an exchange of information and experience on the following issues: What topics should be included in a safety case? Of what should it consist? Is there sufficient and complete guidance nationally and internationally? How do practices differ internationally? Main boundary condition to this session was that it would deal with plants where spent fuel has been removed. Also the topical sessions was kept at a level that makes the most of the varied constituency of the WPDD. Namely, interface issues are important, and issue-identification and discussion was the immediate goal. There was less interest in examining areas where variability amongst national

  17. Radiological survey techniques for decontamination and dismantlement applications

    International Nuclear Information System (INIS)

    Ruesink, G.P.; Stempfley, D.H.; Pettit, P.J.; Warner, R.D.

    1997-01-01

    The Department of Energy's Fernald Environmental Management Project (FEMP) is engaged in an aggressive Program to remove all above ground structures as part of the Fernald sites final remediation remedy. Through the complete removal of major facilities such as Plant 7, Plant 4, and Plant 1, the FEMP has developed radiological survey approaches that are effective for the different phases of the Decontamination and Dismantlement (D ampersand D) process. Some of the most pressing challenges facing the FEMP are implementing effective, low cost methods for the D ampersand D of former process buildings while minimizing environmental effects. One of the key components to ensure minimal impact on the environment is the collection of radiological contamination information during the D ampersand D process to facilitate the decision making process. Prior to the final demolition of any structure, radiological surveys of floors, walls, and ceilings must take place. These surveys must demonstrate that contamination levels am below 5000 dpm removable beta/gamma for non-porous surfaces and below 1000 dpm removable-beta/gamma for all porous surfaces. Technique which can perform these activities in a safe, effective, and cost efficient manner are greatly desired. The FEMP has investigated new approaches to address this need. These techniques include sampling approaches using standard baseline methodology as well as innovative approaches to accelerate final radiological clearance processes. To further improve upon this process, the FEMP has investigated several new technologies through the Fernald Plant 1 Large Scale Technology Demonstration Project. One of the most promising of these new technologies, Laser Induced Fluorescence, may significantly improve the radiological clearance survey process. This paper will present real world experiences in applying radiological control limits to D ampersand D projects as well as relate potential productivity and cost improvements with the

  18. Deterministic Assessment of Future Costs for Dismantling (FA)

    Energy Technology Data Exchange (ETDEWEB)

    Vasko, Marek [DECOM, Trnava (Slovakia)

    2012-11-01

    The main objective of the report is to provide an re-evaluation of cost calculations by OMEGA code for the Intermediate Storage for Spent Fuel in Studsvik (FA facility) using up-to-date Swedish labour cost unit factors and available up-to-date Swedish (or international) cost unit factors for consumables, materials and substances. Furthermore, evolution of other OMEGA database parameters concerning cost calculations e.g. manpower unit factors and workgroups parameters are taken into account. This report follows up former project which introduced tentative calculations of main decommissioning parameters such as costs, manpower and exposure of personnel for activities of older nuclear facility decommissioning in Sweden represented by FA Facility in Studsvik by means of calculation code OMEGA. The project demonstrated an implementation of advanced costing methodology based on PSL structure format to achieve transparent, traceable and comparable estimates even for older nuclear facilities like FA Facility in Studsvik. This former project used Slovak origin labour costs unit factors and other cost unit factors. After successful completion of this project, there was an intent of SSM to reevaluate calculations using an up-to-date Swedish labour cost data and also available Swedish consumables and materials cost data if available. Within this report re-calculations of main decommissioning parameters using available Swedish data are presented in structure according to Proposed Standardized List of Items for Costing Purposes. Calculations are made for decommissioning scenario with post-dismantling decontamination and steel radwaste melting technologies available at the site. All parameters are documented and summed up in both table and graphic forms in text and Annexes. Further, comparison of calculated results with previous calculations together with discussion is provided.

  19. Deterministic Assessment of Future Costs for Dismantling (FA)

    International Nuclear Information System (INIS)

    Vasko, Marek

    2012-03-01

    The main objective of the report is to provide an re-evaluation of cost calculations by OMEGA code for the Intermediate Storage for Spent Fuel in Studsvik (FA facility) using up-to-date Swedish labour cost unit factors and available up-to-date Swedish (or international) cost unit factors for consumables, materials and substances. Furthermore, evolution of other OMEGA database parameters concerning cost calculations e.g. manpower unit factors and workgroups parameters are taken into account. This report follows up former project which introduced tentative calculations of main decommissioning parameters such as costs, manpower and exposure of personnel for activities of older nuclear facility decommissioning in Sweden represented by FA Facility in Studsvik by means of calculation code OMEGA. The project demonstrated an implementation of advanced costing methodology based on PSL structure format to achieve transparent, traceable and comparable estimates even for older nuclear facilities like FA Facility in Studsvik. This former project used Slovak origin labour costs unit factors and other cost unit factors. After successful completion of this project, there was an intent of SSM to reevaluate calculations using an up-to-date Swedish labour cost data and also available Swedish consumables and materials cost data if available. Within this report re-calculations of main decommissioning parameters using available Swedish data are presented in structure according to Proposed Standardized List of Items for Costing Purposes. Calculations are made for decommissioning scenario with post-dismantling decontamination and steel radwaste melting technologies available at the site. All parameters are documented and summed up in both table and graphic forms in text and Annexes. Further, comparison of calculated results with previous calculations together with discussion is provided

  20. Recycling of concrete waste generated from nuclear power plant dismantling

    International Nuclear Information System (INIS)

    Ogawa, Hideo; Nagase, Takahiro; Tanaka, Hiroaki; Nawa, Toyoharu

    2012-01-01

    Non-radioactive concrete waste generated from dismantling of a standard large nuclear power plant is estimated to be about 500,000 tons in weight. Using such waste as recycled aggregate within the enclosure of the plant requires a new manufacturing technology that generates a minimal amount of by-product powder. Recycled aggregate has brittle parts with defects such as cracks, pores, and voids in residual paste from original concrete. This study presents a method of selectively removing the defective parts during manufacture to improve the quality of the recycled fine aggregate. With this selective removal method used, the amount of by-product powder can be reduced by half as compared to that by a conventional method. The influences of the characteristics of the recycled fine aggregate on the flowability and strength of the mortar using recycled fine aggregate were evaluated by multiple linear regression analysis. The results clearly showed that the flowability was primarily affected by the filling fraction of recycled fine aggregate, while the compressive strength of mortar was primarily affected by the fraction of defects in the aggregate. It was also found that grains produced by a granulator have more irregularities in the surfaces than those produced by a ball mill, providing an increased mortar strength. Using these findings from this study, efforts are also being made to develop a mechanical technology that enables simultaneous processing of decontamination and recycling. The granulator under consideration is capable of grinding the surfaces of irregularly shaped particles and may be used successfully, under optimal conditions, for the surface decontamination of concrete waste contaminated with radioactive materials. (author)

  1. The inherent advantages of delayed dismantling of decommissioning nuclear stations

    International Nuclear Information System (INIS)

    Liederman, J.M.; Saroudis, J.I.

    1985-01-01

    Recent studies in Canada pertaining to the decommissioning of the CANDU 600 MW(e) reactor have led to the development of the option of a ''static state'' condition. This alternative is based on judging risk and benefit to society considering the greatly reduced potential radiation exposure to personnel after 30 to 80 years have elapsed, following the final shutdown of the reactor. After approximately 80 to 120 years have elapsed, the decay in all systems and components (with the exception of the reactor assembly) would be such that radiation fields would be at background levels producing an environment that would be acceptable for Stage 3 decommissiong. This philosophy is based on the current engineering judgement that: - All systems, components, and structures which were associated with the nuclear processes and are radioactive, can be put into a static or storage state, and a containment function maintained at low cost for prolonged periods of between 80 to 120 years. - Between 80 to 120 years after shutdown, most of the radioactivity, except for some long lived radionuclides in the reactor vessel itself and its vault, will have naturally decayed to near releasable limits without any external intervention. - There is a lower overall risk to society in this approach, than dismantling and transporting radioactive materials prematurely. This philosophy is developed taking into consideration radiation protection, financial and risk assessment issues. The Canadian concept of dry storage of spent fuel is part of this philosophy and may be of interest to decommissioned nuclear plants of other types. 4 tables, 5 graphs

  2. Preliminary dismantling for the decommissioning of nuclear licensed facilities at the CEA Centre in Fontenay aux Roses

    International Nuclear Information System (INIS)

    Estivie, D.; Bohar, M.P.; Jeanjacques, M.; Binet, C.

    2008-01-01

    Under the perimeter modification programme for the Nuclear Licensed Facilities (NLFs) of the French Atomic Energy Commission centre at Fontenay aux Roses (CEN-FAR), preliminary dismantling work proved necessary to decommission the buildings outside the nuclear perimeter and create interim storage areas for waste packages. This summary describes the dismantling of Buildings 07, 53 and 91/54, which are the most representative of the preliminary dismantling work. (author)

  3. Earthworm symbiont Verminephrobacter eiseniae mediates natural transformation within the host egg capsules using type IV pili

    Directory of Open Access Journals (Sweden)

    SEANA Kelyn DAVIDSON

    2014-10-01

    Full Text Available The dense microbial communities commonly associated with plants and animals should offer many opportunities for horizontal gene transfer (HGT through described mechanisms of DNA exchange including natural transformation. However, studies of the significance of natural transformation have focused primarily on pathogens. The study presented here demonstrates highly efficient DNA exchange by natural transformation in a common symbiont of earthworms. The obligate bacterial symbiont Verminephrobacter eiseniae is a member of a microbial consortium of the earthworm Eisenia fetida that is transmitted into the egg capsules to colonize the embryonic worms. In the study presented here, by testing for transformants under different conditions in culture, we demonstrate that V. eiseniae can incorporate free DNA from the environment, that competency is regulated by environmental factors, and that it is sequence specific. Mutations in the type IV pili of V. eiseniae resulted in loss of DNA uptake, implicating the type IV pilus (TFP apparatus in DNA uptake. Furthermore, injection of DNA carrying antibiotic-resistance genes into egg capsules resulted in transformants within the capsule, demonstrating the relevance of DNA uptake within the earthworm system. The ability to take up species-specific DNA from the environment may explain the maintenance of the relatively large, intact genome of this long-associated obligate symbiont, and provides a mechanism for acquisition of foreign genes within the earthworm system.

  4. Shutdown, dismantling and decommissioning of nuclear facilities in France - Guide no. 6 - Update of 30/08/2016

    International Nuclear Information System (INIS)

    2016-01-01

    After a recall of the regulatory context and references, this guide addresses the strategy for an immediate dismantling of an installation, the dismantling planning, the different phases of the end of life of nuclear base installations, the authorization of definitive stop and dismantling, the preliminary phase preparing the definitive stop (regulatory context, technical aspects), the dismantling phase (regulatory context, technical aspects for the concerned operations, the security functions, hardware important for security, taking ageing into account), and the final status of installations (downgrading, constraints)

  5. Expertise of the Oeko-Institute on the application to obtain permission to partially dismantle the Niederaichbach nuclear power plant

    International Nuclear Information System (INIS)

    1985-01-01

    This expertise gives an overview on the problems associated with the decommissioning and dismantling of the Niederaichbach nuclear power plant, considering technical and legal aspects. It wants to prove that the dismantling of this reactor cannot serve as evidence to prove the general feasibility of reactor dismantling. Much space is dedicated to the discussion about where the borderline should be drawn between radioactive and non-radioactive materials according to the ordinance on radiation protection. The reasons for rejecting the partial dismantling application are given. (DG) [de

  6. State of dismantling of reactor facilities (JPDR) in Tokai Research Establishment, Japan Atomic Energy Research Institute (fiscal year 1986)

    International Nuclear Information System (INIS)

    1987-01-01

    As to this dismantling work, the contents of the notice on the dismantling and the policy of administration offices to deal with it were reported to the Nuclear Safety Commission beforehand, and after the approval was obtained, it has been executed. Based on the talk of the chairman of Nuclear Safety Commission on January 6, 1983, the state of dismantling is reported. In fiscal year 1986, the second stage dismantling was begun in December, and it was confirmed that the works were carried out safety. In order to ensure the place required for dismantling and removing in-core structures and the pressure vessel, the pressure vessel upper cover and its heat insulator were removed from the third story of the containment vessel. A part of the facilities installed on the second and third stories of the containment vessel was also dismantled and removed. In order to utilize as the place for the temporary preservation and decontamination of dismantled things, a part of the facilities installed in the dump condenser building was dismantled and removed. The control building was reconstructed for smoothly carrying out the entrance control of workers. 36 spent fuel assemblies were carried away for reprocessing. The exposure dose of workers was below the detectable limit of film badges. The dismantled wastes were about 171 t of metals and 34 t of concrete. (Kako, I.)

  7. Microelectromechanical acceleration-sensing apparatus

    Science.gov (United States)

    Lee, Robb M [Albuquerque, NM; Shul, Randy J [Albuquerque, NM; Polosky, Marc A [Albuquerque, NM; Hoke, Darren A [Albuquerque, NM; Vernon, George E [Rio Rancho, NM

    2006-12-12

    An acceleration-sensing apparatus is disclosed which includes a moveable shuttle (i.e. a suspended mass) and a latch for capturing and holding the shuttle when an acceleration event is sensed above a predetermined threshold level. The acceleration-sensing apparatus provides a switch closure upon sensing the acceleration event and remains latched in place thereafter. Examples of the acceleration-sensing apparatus are provided which are responsive to an acceleration component in a single direction (i.e. a single-sided device) or to two oppositely-directed acceleration components (i.e. a dual-sided device). A two-stage acceleration-sensing apparatus is also disclosed which can sense two acceleration events separated in time. The acceleration-sensing apparatus of the present invention has applications, for example, in an automotive airbag deployment system.

  8. Experience in dismantling and packaging of pressure vessel and core internals

    International Nuclear Information System (INIS)

    Pillokat, Peter; Bruhn, Jan Hendrik

    2011-01-01

    Nuclear Company AREVA is proud to look back on versatile experience in successfully dismantling nuclear components. After performing several minor dismantling projects and studies for nuclear power plants, AREVA completed the order for dismantling of all remaining Reactor Pressure Vessel internals at German Boiling Water Reactor Wuergassen NPP in October '08. During the onsite activities about 121 tons of steel were successfully cut and packed under water into 200l- drums, as the dismantling was performed partly in situ and partly in an underwater working tank. AREVA deployed a variety of different cutting techniques such as band sawing, milling, nibbling, compass sawing and water jet cutting throughout this project. After successfully finishing this task, AREVA dismantled the cylindrical part of the Wuergassen Pressure Vessel. During this project approximately 320 tons of steel were cut and packaged for final disposal, as dismantling was mainly performed by on air use of water jet cutting with vacuum suction of abrasive and kerfs material. The main clue during this assignment was the logistic challenge to handle and convey cut pieces from the pressure vessel to the packing area. For this, an elevator was installed to transport cut segments into the turbine hall, where a special housing was built for final storage conditioning. At the beginning of 2007, another complex dismantling project of great importance was acquired by AREVA. The contract included dismantling and conditioning for final storage of the complete RPV Internals of the German Pressurized Water Reactor Stade NPP. Very similar cutting techniques turned out to be the proper policy to cope this task. On-site activities took place in up to 5 separate working areas including areas for post segmentation and packaging to perform optimized parallel activities. All together about 85 tons of Core Internals were successfully dismantled at Stade NPP until September '09. To accomplish the best possible on

  9. Nuclear reactor control apparatus

    International Nuclear Information System (INIS)

    Sridhar, B.N.

    1983-01-01

    Nuclear reactor safety rod release apparatus comprises a ring which carries detents normally positioned in an annular recess in outer side of the rod, the ring being held against the lower end of a drive shaft by magnetic force exerted by a solenoid carried by the drive shaft. When the solenoid is de-energized, the detent-carrying ring drops until the detents contact a cam surface associated with the lower end of the drive shaft, at which point the detents are cammed out of the recess in the safety rod to release the rod from the drive shaft. In preferred embodiments of the invention, an additional latch is provided to release a lower portion of a safety rod under conditions that may interfere with movement of the entire rod

  10. Multichannel Thomson scattering apparatus

    International Nuclear Information System (INIS)

    Bretz, N.; Dimock, D.; Foote, V.; Johnson, D.; Long, D.; Tolnas, E.

    1977-07-01

    A Thomson scattering apparatus for measuring the electron temperature and density along a 90 cm diameter of the PLT plasma has been built. A wide angle objective images the 3 mm x 900 mm ruby laser beam onto an image dissector which rearranges the 300 : 1 image to 20 : 1 forming the input slit of a spectrometer. The stigmatic spectrometer provides 20 wavelength elements of approximately 70 A each. A micro-channel-plate image intensifier optically coupled to a cooled SIT tube provides detection with single frame linearity and 1000 : 1 dynamic range. Spatial profiles of N/sub e/ and T/sub e/ in the range 10 13 - 10 14 cm -3 and 0.05 - 3 keV have an accuracy of 30 √10 13 /N/sub e/ (cm -3 ) percent per 1.2 cm element

  11. Apparatus for stereotactic surgery

    International Nuclear Information System (INIS)

    Koslow, M.A.M.

    1982-01-01

    Apparatus for stereotactic surgery consisting of a probe and a computerized tomographic scanning system is described. The scanning system comprises a display and means for reconstructing cross-sectional images on the display using data from partial circumferential scans of source and detectors. It operates on the data with an algorithm that provides the difference between the local values of the linear attenuation coefficient and average of these values within a circle centered at each reconstruction point. The scanning system includes a means of maintaining the frames of reference of the probe and scanning system rigid with respect to one another. The position of the probe, which may be a cryogenic probe, with respect to the actual anatomical structure of the body, particularly a human head, may thus be viewed by the surgeon. (author)

  12. Radiation imaging apparatus

    International Nuclear Information System (INIS)

    Cooperstein, G.; Lanza, R.C.; Sohval, A.R.

    1980-01-01

    Radiation imaging apparatus especially suited for use in a computerized tomographic (CT) scanner is specified. It employs a fixed array of discrete X-ray sources, each being a cold cathode diode having an impedance in excess of about 100 ohms and an adjacent fixed array of closely packed radiation detectors to produce images of rapidly moving body organs such as the beating heart. The X-ray source is pulsed by a 120 to 130 kv pulse of 150 to 160 ns duration, derived from an unregulated DC source, of output voltage 15 to 30 kv. Each X-ray source may comprise a cold cathode pulse or may be constituted by a pair of annular cathodes having radially extending anodes therebetween. (author)

  13. Radiation measuring apparatus

    International Nuclear Information System (INIS)

    Schmid, C.J.

    1983-01-01

    A colorimeter in which a light source, a collimating lens and a band pass filter are supported by a housing that is movable with respect to a stationary beam dividing assembly in a direction at least substantially transverse to the optical axis of the light from the source. The assembly separates the incoming collimated and filtered light into a sample beam and a reference beam which are directed back toward the housing in directions parallel to the optical axis. The movement of the housing toward or away from the sample produces an increase or decrease in the intensity of the light illuminating the sample and a corresponding decrease or increase in the intensity of the light at the reference detector. The arrangement is such that the apparatus may be readily adjusted to obtain accurate colorimeter readings even for samples having abnormally high or low density characteristics

  14. Apparatus for extracting petroleum

    Energy Technology Data Exchange (ETDEWEB)

    Coogan, J

    1921-01-18

    An apparatus for extracting petroleum from petroleum bearing sand or shale is described comprising a container for liquids, the container being divided into a plurality of compartments, an agitator mounted within the container and below the liquid level and having its forward end opening into one of the compartments, means for delivering sand or shale to the forward end of the agitator, means for subjecting the sand or shale to the action of a solvent for the petroleum while the sand or shale is being agitated and is submerged, the first-mentioned compartment being adapted to receive the extracted petroleum and means for removing the treated sand or shale from adjacent the rear end of the agitator.

  15. Radiation shielding apparatus

    International Nuclear Information System (INIS)

    McCullagh, R.J.

    1977-01-01

    The disclosure pertains to a clamping apparatus having a stud capturing portion and a stud facing portion bolted together so as to compressively support a radiation-proof sheet material, such as lead sheeting, there-in-between. The interior wall covering material, such as panelling or wall board, is secured to the external surface of the stud facing portion. No nails are required to support the radiation-proof sheeting material, thereby minimizing accidental leakage due to harmful radiation passing through openings inadvertently disposed in the radiation-proof sheeting in the conventional nail securing supporting thereof. A pair of radiation-proof tracks capture the free ends of the stud capturing portion and the stud facing portion

  16. Radioactive waste treatment apparatus

    International Nuclear Information System (INIS)

    Abrams, R.F.; Chellis, J.G.

    1983-01-01

    Radioactive waste treatment apparatus is disclosed in which the waste is burned in a controlled combustion process, the ash residue from the combustion process is removed and buried, the gaseous effluent is treated in a scrubbing solution the pH of which is maintained constant by adding an alkaline compound to the solution while concurrently extracting a portion of the scrubbing solution, called the blowdown stream. The blowdown stream is fed to the incinerator where it is evaporated and the combustibles in the blowdown stream burned and the gaseous residue sent to the scrubbing solution. Gases left after the scrubbing process are treated to remove iodides and are filtered and passed into the atmosphere

  17. Capacitive gauging apparatus

    International Nuclear Information System (INIS)

    Walton, H.

    1985-01-01

    Apparatus for gauging physical dimensions of solid or tubular bodies (e.g. a nuclear fuel pellet) comprises a capacitive transducer having electrodes forming diametrically arranged pairs of capacitors and means for connecting the pairs, preferably sequentially, in an arm of a four arm electrical network. For circumferential scanning of a solid body along its length, the body is moved along a path of travel through head assembly including the transducer by means of plungers with the axis of the body being coincident with the axis of the transducer. As the body moves through the transducer the diametrically arranged pairs of capacitors scan the surface to result in a surface profile of the body. For scanning the bore of a pipe or tube the transducer is inserted as a probe and moved along the bore of the pipe or tube, means being provided for maintaining the probe coaxial with the pipe or tube. (author)

  18. Nuclear fusion apparatus

    International Nuclear Information System (INIS)

    Takizawa, Teruhiro.

    1975-01-01

    Object: To provide a nuclear fusion apparatus which can make a disorderly magnetic field due to shell current as small as possible, thereby enhancing efficiency. Structure: On each divided end of each shell is integrally projected an auxiliary shell which has thick greater than the other portion of shell. These auxiliary shells are made of a material of high electric conductivity, and the shape of the auxiliary shells may properly be selected so that electric resistance of the auxiliary shell at the divided end of the shell to the shell current may be made smaller than the electric resistance of intermediate of the shell to the shell current. With this, the shell current is concentrated on the auxiliary shell at the divided end of the shell to form an adjacent reciprocating current between it and the shell current opposite the auxiliary shell, thus reducing the disorderly magnetic field. (Yoshihara, H.)

  19. Reactor head shielding apparatus

    International Nuclear Information System (INIS)

    Schukei, G.E.; Roebelen, G.J.

    1992-01-01

    This patent describes a nuclear reactor head shielding apparatus for mounting on spaced reactor head lifting members radially inwardly of the head bolts. It comprises a frame of sections for mounting on the lifting members and extending around the top central area of the head, mounting means for so mounting the frame sections, including downwardly projecting members on the frame sections and complementary upwardly open recessed members for fastening to the lifting members for receiving the downwardly projecting members when the frame sections are lowered thereto with lead shielding supported thereby on means for hanging lead shielding on the frame to minimize radiation exposure or personnel working with the head bolts or in the vicinity thereof

  20. Foil changing apparatus

    International Nuclear Information System (INIS)

    Crist, C.E.; Ives, H.C.; Leifeste, G.T.; Miller, R.B.

    1988-01-01

    A self-contained foil changer apparatus for replenishing foil material across the path of a high energy particle beam is described comprising: a cylindrical hermetically sealed housing comprising an end plate having an aperture defining a beam passageway therethrough; foil supply means disposed inside the housing for storing a foil web and supporting a portion of the web across the beam passageway to form a plane perpendicular to the beam path; a barrel assembly disposed inside the housing; web control means extending through the housing and operably connected to the foil supply means for selectively advancing the foil web to replenish a portion across the beam passageway; and barrel control means extending through the housing and operably connected to the barrel assembly for selectively moving the barrel to and from the advanced and retracted positions

  1. Spine immobilization apparatus

    Science.gov (United States)

    Lambson, K. H.; Vykukal, H. C. (Inventor)

    1981-01-01

    The apparatus makes use of a normally flat, flexible bladder filled with beads or micro-balloons that form a rigid mass when the pressure within the bladder is decreased below ambient through the use of a suction pump so that the bladder can be conformed to the torso of the victim and provide the desired restraint. The bladder is strapped to the victim prior to being rigidified by an arrangement of straps which avoid the stomach area. The bladder is adapted to be secured to a rigid support, i.e., a rescue chair, so as to enable removal of a victim after the bladder has been made rigid. A double sealing connector is used to connect the bladder to the suction pump and a control valve is employed to vary the pressure within the bladder so as to soften and harden the bladder as desired.

  2. Apparatus for proton radiography

    International Nuclear Information System (INIS)

    Martin, R.L.

    1976-01-01

    An apparatus for effecting diagnostic proton radiography of patients in hospitals comprises a source of negative hydrogen ions, a synchrotron for accelerating the negative hydrogen ions to a predetermined energy, a plurality of stations for stripping extraction of a radiography beam of protons, means for sweeping the extracted beam to cover a target, and means for measuring the residual range, residual energy, or percentage transmission of protons that pass through the target. The combination of information identifying the position of the beam with information about particles traversing the subject and the back absorber is performed with the aid of a computer to provide a proton radiograph of the subject. In an alternate embodiment of the invention, a back absorber comprises a plurality of scintillators which are coupled to detectors. 10 claims, 7 drawing figures

  3. Radioactive gas solidification apparatus

    International Nuclear Information System (INIS)

    Kobayashi, Yoshihiro; Seki, Eiji; Yabu, Tomohiko; Matsunaga, Hiroyuki.

    1990-01-01

    Handling of a solidification container from the completion for the solidifying processing to the storage of radioactive gases by a remote control equipment such as a manipulator requires a great cost and is difficult to realize. In a radioactive gas solidification device for injection and solidification in accumulated layers of sputtered metals by glow discharge, radiation shieldings are disposed surrounding the entire container, and cooling water is supplied to a cooling vessel formed between the container and the shielding materials. The shielding materials are divided into upper and lower shielding materials, so that solidification container can be taken out from the shielding materials. As a result, the solidification container after the solidification of radioactive gases can be handled with ease. Further, after-heat can be removed effectively from the ion injection electrode upon solidifying treatment upon storage, to attain a radioactive gas solidifying processing apparatus which is safe, economical and highly reliable. (N.H.)

  4. Induction melter apparatus

    Science.gov (United States)

    Roach, Jay A [Idaho Falls, ID; Richardson, John G [Idaho Falls, ID; Raivo, Brian D [Idaho Falls, ID; Soelberg, Nicholas R [Idaho Falls, ID

    2008-06-17

    Apparatus and methods of operation are provided for a cold-crucible-induction melter for vitrifying waste wherein a single induction power supply may be used to effect a selected thermal distribution by independently energizing at least two inductors. Also, a bottom drain assembly may be heated by an inductor and may include an electrically resistive heater. The bottom drain assembly may be cooled to solidify molten material passing therethrough to prevent discharge of molten material therefrom. Configurations are provided wherein the induction flux skin depth substantially corresponds with the central longitudinal axis of the crucible. Further, the drain tube may be positioned within the induction flux skin depth in relation to material within the crucible or may be substantially aligned with a direction of flow of molten material within the crucible. An improved head design including four shells forming thermal radiation shields and at least two gas-cooled plenums is also disclosed.

  5. Evaluation formulas of manpower needs for dismantling of equipments in uranium refining and conversion plant

    International Nuclear Information System (INIS)

    Izumo, Sari; Usui, Hideo; Kubota, Shintaro; Tachibana, Mitsuo; Kawagoshi, Hiroshi; Tokuyasu, Takashi; Takahashi, Nobuo; Morimoto, Yasuyuki; Tanaka, Yoshio; Sugitsue, Noritake

    2014-07-01

    Japan Atomic Energy Agency has developed PROject management data evaluation code for DIsmantling Activities (PRODIA) to make an efficient decommissioning for nuclear facilities. PRODIA is a source code which provides estimated value such as manpower needs, costs, etc., for dismantling by evaluation formulas according to the type of nuclear facility. Evaluation formulas of manpower needs for dismantling of equipments about reprocessed uranium conversion in Uranium Refining and Conversion Plant (URCP) have been developed in this report. In the result, evaluation formulas of manpower needs for dismantling of equipment were derived based on the classifications of equipment's functions or work items. These evaluation formulas are widely applicable to the estimation of the manpower needs for dismantling the other nuclear facilities, in particular uranium handling facilities. It was confirmed that some of these evaluation formulas with the same applicable condition could be unified to some inclusive evaluation formulas. It turned out that all steel equipment contaminated by uranium could be evaluated by one evaluation formula. (author)

  6. DECISION ANALYSIS SCIENCE MODELING FOR APPLICATION AND FIELDING SELECTION APPLIED TO EQUIPMENT DISMANTLEMENT TECHNOLOGIES

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    The dismantlement of radioactively contaminated process equipment is a major concern during the D and D process. There are an estimated 1,200 buildings in the DOE-EM complex that will require the dismantlement of equipment and various metal structures. As buildings undergo the D and D process, this metallic equipment contaminated with radionuclides such as uranium and plutonium must be size-reduced before final disposal. A single information source comparing dismantlement technologies in the areas of safety, cost, and performance is needed by DOE managers and is not currently available. The selection of the appropriate technologies to meet the dismantlement objectives for a given site is a difficult process in the absence of comprehensive and comparable data. Choosing the wrong technology could result in increased exposure of personnel to contaminants and an increase in D and D project costs. The purpose of this investigation was to evaluate commercially available and innovative technologies for equipment dismantlement and provide a comprehensive source of information to the D and D community in the areas of technology performance, cost, and health and safety

  7. Processing of LLW arising from dismantling activities in a reprocessing facility

    International Nuclear Information System (INIS)

    Geens, L.G.; Geens, L.P.; Vandeven, I.

    1990-01-01

    The Eurochemic reprocessing facility, at the Mol-Dessel site in Belgium was in active operation from July 1966 until January 1975. In total, about 210 Mg of various types of irradiated nuclear fuels were processed. After the shut-down the plant has been partially decontaminated in view of recommissioning. When the recommissioning option was abandoned, the decision was taken in 1986 to dismantle the plant. A 2 years study resulted in the start of a pilot project: the dismantling of two smaller buildings, previously used for storage of uranyl nitrate and used solvent. The minimization of radioactive waste generation was also one of the major goals of this project. The report deals with the different steps in the minimization of radioactive waste generation during the dismantling activities. First, an estimation of the amounts of radioactive waste, expected to be generated, was made. In a second step the actual waste production during dismantling operations was minimized and compared with the estimations. Finally, a large part of the primary radioactive dismantling waste has been completely decontaminated, resulting in much lower amounts of nuclear waste generated. 2 refs., 3 figs., 2 tabs

  8. Dismantling of alpha contaminated obsolete installations and glove boxes on the IRMM site in Geel (Belgium)

    International Nuclear Information System (INIS)

    Cretskens, Pieter; Lenie, Koen; Melis, Gustaaf

    2007-01-01

    At the Institute for Reference Materials and Measurements (European commission, Joint Research Centre, IRMM) a dismantling campaign of obsolete installations and glove boxes has been carried out in 2005. There were various reasons for their removal. Some large installations did not meet modern safety standards, other installations were worn out and expected to cause a radioactive contamination risk in the future. The main goal was to create as less waste as possible by extensive contamination checks and by decontamination if necessary. For the glove boxes, decontamination was not possible. A controlled area was set up around the installation to be dismantled in order to prevent spreading of contamination from dust and dirt. This was only possible for the 'minor' contaminated installations. The dismantling campaign of the glove boxes was carried out by using tents of two types depending the contamination inside the glove boxes. The most common glove boxes were dismantled in a tent constructed with hard surfaced polycarbonate plates (ventilated cell). For glove boxes with higher contamination, the same principle was used but with a second 'glove box tent' inside (ventilated glove tent). The purpose of this project was to learn from the experience of this campaign which gave the ability to make estimates of future radioactive waste or classic waste that could be expected from dismantled installations. (authors)

  9. Experience with Dismantling of the Analytic Cell in the JRTF Decommissioning Program

    International Nuclear Information System (INIS)

    Annoh, Akio; Nemoto, Koichi; Tajiri, Hideo; Saito, Keiichiro; Miyajima, Kazutoshi; Myodo, Masato

    2003-01-01

    The analytic cell was mainly used for process control analysis of the reprocessing process and for the measurement of fuel burn up ratio in JAERI's Reprocessing Test Facility (JRTF). The analytic cell was a heavy shielded one and equipped with a conveyor. The cell was alpha and beta(gamma)contaminated. For dismantling of analytic cells, it is very important to establish a method to remove the heavy shield safely and reduce the exposure. At first, a green house was set up to prevent the spread out of contamination, and next, the analytic cell was dismantled. Depending on the contamination condition, the workers wore protective suits such as air ventilated-suits for prevention of internal exposure and vinyl chloride aprons, lead aprons in order to reduce external exposure. From the work carried out, various data such as needed manpower for the activities, the collective dose of workers by external exposure, the amount of radioactive wastes and the relation between the weight of the shield and its dismantling efficiency were obtained and input for the database. The method of dismantling and the experience with the dismantling of the analytic cell in the JRTF, carried out during 2001 and 2002, are described in this paper

  10. Taking into account of dismantling constraints in the design of nuclear facilities

    International Nuclear Information System (INIS)

    Gouhier, E.; Moitrier, C.; Girones, P.; Pitrou, Y.; Poncet, P.; O'Sullivan, P.

    2014-01-01

    The taking into account of dismantling constraints in the design of nuclear facilities allows the reduction of the dosimetry during the dismantling operations, the reduction of the amount of wastes to manage and the saving of time and money by foreseeing an adequate and simple solution for each component. It is to notice that the strategy of life-extension strengthens that of dismantling because life-extension implies the possibility for any component of the reactor except the pressure vessel to be replaced. The feedback experience capitalized on various types of nuclear facilities have enabled IAEA and OECD to publish recommendations to facilitate dismantling. For instance, pipes and ventilation ducts must be designed to minimize the deposit of dust and residues, the natural porosity of concrete must be limited through the use of polishing products or a metal liner, the type and concentrations of impurities present in the structure materials must be controlled to limit radioactivation, the documentation describing the facility must be kept up to date, or the history of contamination events must be recorded all along the life of the facility. The integration of the dismantling constraints in the design stage is illustrated with 3 examples: the Georges Besse 2 enrichment fuel plant, new reactors (EPR, ASTRID and RJH), and ITER. (A.C.)

  11. Design of Endoscopic Capsule With Multiple Cameras.

    Science.gov (United States)

    Gu, Yingke; Xie, Xiang; Li, Guolin; Sun, Tianjia; Wang, Dan; Yin, Zheng; Zhang, Pengfei; Wang, Zhihua

    2015-08-01

    In order to reduce the miss rate of the wireless capsule endoscopy, in this paper, we propose a new system of the endoscopic capsule with multiple cameras. A master-slave architecture, including an efficient bus architecture and a four level clock management architecture, is applied for the Multiple Cameras Endoscopic Capsule (MCEC). For covering more area of the gastrointestinal tract wall with low power, multiple cameras with a smart image capture strategy, including movement sensitive control and camera selection, are used in the MCEC. To reduce the data transfer bandwidth and power consumption to prolong the MCEC's working life, a low complexity image compressor with PSNR 40.7 dB and compression rate 86% is implemented. A chipset is designed and implemented for the MCEC and a six cameras endoscopic capsule prototype is implemented by using the chipset. With the smart image capture strategy, the coverage rate of the MCEC prototype can achieve 98% and its power consumption is only about 7.1 mW.

  12. Physics of ignition for ICF capsules

    International Nuclear Information System (INIS)

    Lindl, J.D.

    1989-01-01

    The implosion of an ICF capsule must accomplish both compression of the main fuel to several hundred grams per cubic centimeter and heating and compression of the central region of the fuel to ignition. This report discusses the physics of these conditions

  13. Extended School Year. Information Capsule. Volume 0910

    Science.gov (United States)

    Blazer, Christie

    2010-01-01

    Extended school years are being considered by districts around the country as educators search for new ways to raise student achievement. The addition of time to the school calendar is also supported by President Barack Obama, who recently stated that American students do not spend enough time in school. This Information Capsule addresses research…

  14. Isolation of Capsulate Bacteria from Acute Dentoalveolar Abscesses

    OpenAIRE

    Lewis, M. A. O.; Milligan, S. G.; MacFarlane, T. W.; Carmichael, F. A.

    2011-01-01

    The presence of a capsule was determined for 198 bacterial strains (57 facultative anaerobes, 141 strict anaerobes) isobdted from pus samples aspirated from 40 acute dentoalveolar abscesses. A total of 133 (67 per cent) of the isolates (42 facultative anaerobes, 91 strict anaerobes) were found to have a capsule. Possession ofa capsule may in part explain the apparent pathogenicity of the bacterial species encountered in acute dentoalveolar abscess.Keywords - Bacterial capsule; Acute dentoalve...

  15. Outsourcing and "dismantling" of steady jobs at hospitals.

    Science.gov (United States)

    Souza, Helton Saragor de; Mendes, Áquilas Nogueira

    2016-04-01

    To relate hospitals' organizational structure as the core of a web of outsourced services and flexible employment bonds among healthcare professionals in the context of finance capitalism, analyzing work arrangements based mainly on the type of employment bond. Qualitative research through ethnography, interviews, data analysis, and case studies. The case studies were concentrated in 3 hospitals located in the São Paulo metropolitan region under different management types: public administration; outsourced administration via a healthcare social organization (HSO); and private administration. This study highlights a trend in outsourcing, dismantling of steady jobs, and shaping working relations asymmetrically in terms of healthcare professions. These aspects are characteristic of contemporary capitalism and post-Fordist work organization. In this context, the state under sponsorship cripples the very existence of an effective human resources policy, creating a favorable environment for outsourcing and flexibility of employment bonds among healthcare workers. Relacionar a estrutura organizativa dos hospitais como núcleo de uma rede de serviços subcontratados e a flexibilização dos vínculos contratuais dos profissionais de saúde no contexto de capitalismo financeirizado, analisando os regimes de trabalho condicionados centralmente pelo vínculo empregatício. Pesquisa qualitativa através de etnografia, realização de entrevistas, análise de dados e utilização de estudo de caso. Os estudos de caso concentram-se em três hospitais localizados Região Metropolitana de São Paulo com gestões distintas: administração pública; administração terceirizada para Organização Social de Saúde (OSS); e administração privada. Destacamos a tendência da terceirização, do desmonte do emprego estável e a conformação de relações trabalhistas assimétricas para as profissões em saúde. Esses aspectos são característicos do período do capitalismo

  16. Vandellos 1 NPP. Dismantling at the level 1

    International Nuclear Information System (INIS)

    Pla, E.; Perez Pallares, J.

    1998-01-01

    . The radiological protection during dismantling activities took care of α contamination. The plant safety is always surveyed by the Regulatory Authority (CSN) which required to revise the Technical Specifications several times, according to the nuclear evolution of the site. (author)

  17. Ingestible capsule for remote controlled release of a substance

    DEFF Research Database (Denmark)

    2014-01-01

    The application relates to an ingestible capsule (102) for delivery of a substance e.g. a pharmaceutical drug, to a human or animal. The ingestible capsule comprises a capsule wall structure (202) forming a substantially sealed reservoir or lumen holding the substance (204). An electrical resonance...

  18. Drafting of the dismantling operations of the MAR 200 workshop with the help of virtual reality

    International Nuclear Information System (INIS)

    Chabal, C.; Soulabaille, Y.; Garnier, T.; Callixte, O.

    2014-01-01

    In order to optimize future dismantling operations of nuclear installations virtual reality allows the validation of predefined scenarios and their adequacy with the environment. CEA uses an immersion and interactive room to validate maintenance and dismantling operations. The equipment of this room is composed of a video wall that gives a 3-dimensional view of the virtual environment, and of a system for motion capture. For the simulation of handling operations a haptic interface has been designed, it allows the user to receive a tactic and effort-feeling feed back. The immersion is completed by a phonic ambience that creates sounds for virtual operations. The use of the immersion room for optimizing the dismantling of a spent fuel dissolver (MAR 200) used in hot cell is presented. (A.C.)

  19. Present status of refining and conversion facility dismantling. Progress in first half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-06-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  20. Present status of refining and conversion facility dismantling. Progress in first half of 2009FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-03-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  1. Present status of refining and conversion facility dismantling. Progress in latter half of 2008FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-01-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2008FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  2. Manually-Operated Crate Dismantlement System for Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Laffitte, John; Lagos, Leo; Morales, Miguel

    2002-01-01

    Los Alamos National Laboratory currently possesses between 500 and 800 fiberglass-reinforced plywood crates that contain hazardous materials that need to be decontaminated. To access the hazardous material, a system is needed to dismantle the crate. Currently, crates are dismantled by workers using hand-held tools. This technique has numerous disadvantages. One disadvantage is that it is difficult for a worker to hold the tool for an extended period of time in the awkward angles and positions necessary to fully size-reduce the crate. Other disadvantages of using hand tools include managing power cords and vacuum hoses, which become entangled or can act as tripping hazards. In order to improve the crate opening and size-reduction task, Florida International University's Hemispheric Center for Environmental Technology (HCET) is developing a manually operated crate dismantlement system. This versatile system is expected to greatly increase worker efficiency while decreasing fatigue and the possibility of accidents. (authors)

  3. Deregulation in the field of decommissioning and dismantling of nuclear facilities

    International Nuclear Information System (INIS)

    Kurz, A.

    1994-05-01

    The report comprises two articles covering current topics of the decommissioning and dismantling of nuclear facilities. In the first article written by Kurz, the legal standards are listed together with conclusions and proposals regarding their implementation for the further development of this field of law. The article by Baumgaertel is aimed at evaluating the regulations governing nuclear technology as regards their applicability to the decommissioning and dismantling of nuclear facilities. These articles shall contribute to the discussions taking place in this field at the moment. As a result, an appropriate and project-specific application of the legal provisions and not legally binding (technical) regulations in the field of nuclear technology (deregulation) in the licensing procedures required for the decommissioning and dismantling of nuclear facilities is requested by the authors. (orig.) [de

  4. Reactor vessel dismantling at the high flux materials testing reactor Petten

    International Nuclear Information System (INIS)

    Tas, A.; Teunissen, G.

    1986-01-01

    The project of replacing the reactor vessel of the high flux materials testing reactor (HFR) originated in 1974 when results of several research programs confirmed severe neutron embrittlement of aluminium alloys suggesting a limited life of the existing facility. This report describes the dismantling philosophy and organisation, the design of special underwater equipment, the dismantling of the reactor vessel and thermal column, and the conditioning and shielding activities resulting in a working area for the installation of the new vessel with no access limitations due to radiation. Finally an overview of the segmentation, waste disposal and radiation exposure is given. The total dismantling, segmentation and conditioning activities resulted in a total collective radiation dose of 300 mSv. (orig.) [de

  5. Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996

    International Nuclear Information System (INIS)

    None

    1997-01-01

    OAK A271 Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996. The Rockwell International Hot Laboratory (RIHL) is one of a number of former nuclear facilities undergoing decontamination and decommissioning (D and D) at the Santa Susana Field Laboratory (SSFL). The RIHL facility is in the later stages of dismantlement, with the final objective of returning the site location to its original natural state. This report documents the decontamination and dismantlement activities performed at the facility over the time period 1988 through 1996. At this time, the support buildings, all equipment associated with the facility, and the entire above-ground structure of the primary facility building (Building 020) have been removed. The basement portion of this building and the outside yard areas (primarily asphalt and soil) are scheduled for D and D activities beginning in 1997

  6. International Cooperation for the Dismantling of Chooz A Reactor Pressure Vessel

    International Nuclear Information System (INIS)

    Grenouillet, J.J.; Posivak, E.

    2009-01-01

    Chooz A is the first PWR that is being decommissioned in France. The main issue that is conditioning the success of the project is the Reactor Pressure Vessel (RPV) and Reactor Vessel Internals (RVI) segmentation. Whereas Chooz A is the first and unique RPV and RVI being dismantled in France, there are many similar experiences available in the world. Thus the project team was eager to cooperate with other teams facing or being faced with the same issue. A cooperation programme was established in two separate ways: - Benefiting from experience feedback from completed RPV and RVI dismantling projects, - Looking for synergy with future RPV dismantling projects for activities such as segmentation tools design, qualification and manufacturing for example. This paper describes the implementation of this programme and how the outcome of the cooperation was used for the implementation of Chooz-A RPV and RVI segmentation project. It shows also the limits of such a cooperation. (authors)

  7. Radioactivity, radiation protection and monitoring during dismantling of light-water reactors

    International Nuclear Information System (INIS)

    Hummel, L.; Zech, J.B.

    2005-01-01

    Based on the radioactivity inventory in the systems and components of light-water reactors observed during operation, the impact of actions during plant emptying after the conclusion of power operation and possible subsequent long-term safe enclosure concerning the composition of the nuclide inventory of the plant to be dismantled will be described. Derived from this will be the effects on radioactivity monitoring in the plant, physical radiation protection monitoring, and the measured characterization of the residual materials resulting from the dismantling. The impact of long-term interim storage will also be addressed in the discussion. The talk should provide an overview of the interrelationships between source terms, decay times and the radioactivity monitoring requirements of the various dismantling concepts for commercial light-water reactors. (orig.)

  8. Stage 2: dismantling of reactor case of the experimental F.B.R. Rapsodie

    International Nuclear Information System (INIS)

    Roger, J.

    1994-01-01

    This document defines the main objectives of stage 2 dismantling of the Rapsodie experimental fast neutron reactor and specifies its time schedule. The work already in progress consists in containing the reactor vessel and its internal equipment, as well as the neutron protection concrete, inside the two leak-tight barriers, and in dismantling all the systems and equipment systems contaminated by sodium. This work, which includes the destruction of 37 metric tons of contaminated sodium from the primary system, was begun in 1987 and will be completed in 1994. The duration of the waiting period for complete dismantling (stage 3) has not been defined. However, the containment and monitoring means implemented should allow a safe waiting period of several decades. (author). 4 figs

  9. Remote dismantlement tasks for the CP5 reactor: Implementation, operations, and lessons learned

    International Nuclear Information System (INIS)

    Noakes, M.W.

    1998-01-01

    This paper presents a developer's perspective on lessons learned from one example of the integration of new prototype technology into a traditional operations environment. The dual arm work module was developed by the Robotics Technology Development Program as a research and development activity to examine manipulator controller modes and deployment options. It was later reconfigured for the dismantlement of the Argonne National Laboratory Chicago Pile number-sign 5 reactor vessel as the crane-deployed dual arm work platform. Development staff worked along side operations staff during a significant part of the deployment to provide training, maintenance, and tooling support. Operations staff completed all actual remote dismantlement tasks. At the end of available development support funding, the Dual Arm Work Platform was turned over to the operations staff, who is still using it to complete their dismantlement tasks

  10. Analytical Model for the Probability Characteristics of a Crack Penetrating Capsules in Capsule-Based Self-Healing Cementitious Materials

    Directory of Open Access Journals (Sweden)

    Zhong LV

    2017-08-01

    Full Text Available Autonomous crack healing using pre-embedded capsules containing healing agent is becoming a promising approach to restore the strength of damaged structures. In addition to the material properties, the size and volume fraction of capsules influence crack healing in the matrix. Understanding the crack and capsule interaction is critical in the development and design of structures made of capsule-based self-healing materials. Continuing our previous study, in this contribution a more practical rupturing mode of capsules characterizing the rupturing manner of capsules fractured by cracks in cementitious materials is presented, i.e., penetrating mode. With the underlying assumption that a crack penetrating capsules undoubtedly leads to crack healing, geometrical probability theory is employed to develop the quantitative relationship between crack size and capsule size, capsule concentration in capsule-based self-healing virtual cementitious material. Moreover, an analytical expression of probability of a crack penetrating with randomly dispersed capsules is developed in two-dimensional material matrix setup. The influences of the induced rupturing modes of capsules embedded on the self-healing efficiency are analyzed. Much attention is paid to compare the penetrating probability and the hitting probability, in order to assist the designer to make a choice of the optimal rupturing modes of capsules embedded. The accuracy of results of the theoretical model is also compared with Monte-Carlo numerical analysis of crack interacting with capsules. It shows that the developed probability characteristics of a crack interaction with capsules for different rupturing modes is helpful to provide guidelines for designer working with capsule-based self-healing cementitious materials.DOI: http://dx.doi.org/10.5755/j01.ms.23.3.16888

  11. Failure prevention with stress measurement for dismantling of nuclear facilities. Final report

    International Nuclear Information System (INIS)

    Komber, T.; Reimche, W.; Bach, F.W.

    2003-07-01

    The dismantling of nuclear facilities is in progress since 20 years in Germany. Practical experiences in decommissioning have shown, that problem can occur during dismantling operations caused by release of residual stresses. In this case cutting parts or cutting tools get jammed if mechanical cutting techniques are used. The aim of this research work was to develop measuring techniques for the determination of the stress state in RPV, to predict the deformation during dismantling operations. This can serve as additional base for improved decommissioning planning and for time optimised dismantling. For determination of the stress state in components two small and inexpensive measuring techniques were new designed, for remote-controlled on-site use in atmosphere and under water. For the nondestructive determination of the directional stress state, based on the magnetostriction and the Harmonic-Analysis of alternating magnetic fields, a new developed rotating sensor is in use with a principal magnetisation direction. Because of the mainly isotropic material properties and the directional stresses, measured Harmonic values are influenced mainly by the stress state in the surface areas. In this way it is possible to determine the stress state qualitatively and the direction of principal stresses in the surface areas of the component. As an alternative to the established wire strain gauge, which remote-controlled application is still not possible under water, a new slot jet cutting strain control technique was designed. This technique detects the deformation in the surface after stresses are cut free by a water jet. So the stress state could be determined quantitatively in the surface and assessed in the depth. With the help of these two measuring techniques it is possible to characterize the stress state along a planned cutting line. The use of an adapted FEM simulation enables to calculate and determine the deformation of the cutting gap beforehand. These information

  12. Development of equipments for remote dismantling of joule heated ceramic melter

    International Nuclear Information System (INIS)

    Badgujar, Kiran T.; Usarkar, Sachin G.; Kumar, Binu; Nair, K.N.S.

    2011-01-01

    Joule Heated Ceramic Melter (JHCM) technology has been adopted for industrial scale vitrification of high level liquid waste (HLLW) at Tarapur and Kalpakkam. The melter installed at Advanced Vitrification System (AVS), Tarapur has immobilized 175 m 3 of HLLW in 113 canisters containing 11533Kg of Vitrified Waste Product (VWP). The melter has been in operation for 3 years before shutdown. It is intended to demonstrate the complete procedure of dismantling of Joule Melter in 1:1 scale prior to going in for actual dismantling in the hot cell. The Melter consists of an assembly of Inconel/SS pipes and plates, fuse cast refractories, thermal insulations of various types inside a SS casing and possibly some glass which is left over in the melter. Dismantling of melter involves remote cutting of the outer casing, pipe connections, electrical connections and removal, sizing and packing of internals in a sequential manner to minimise generation of secondary waste. The challenge involves development of remotely operated multi-degrees of freedom fixtures, modification and performance testing of standard industrial cutting and breaking tools and adapting them for remote operations. The work also involves development of equipments for collection of waste generated during the dismantling operation and packaging thus in special packages. Remotely actuated fixtures have been developed for remote top plate and side electrodes cutting. Remotely operated grab has been developed for handling of loose material and grippers have been developed for handling of refractory blocks. Industrial vacuum suction device has been modified into split units to enable for reducing the spread of powder material, while dismantling in progress. The performance test of developed fixtures, equipments, cutting and breaking tools have been carried on 1:1 scale melter model. Various parameters like cutting speed, cutting tool performance, generation of waste volume has been measured and analysed for

  13. Dismantling id the reactor pressure vessel insulation and dissecting of the MZFR reactor pressure vessel

    International Nuclear Information System (INIS)

    Loeb, Andreas; Stanke, Dieter; Thoma, Markus; Eisenmann, Beata; Prechtl, Erwin; Dehnke, Burckhard

    2008-01-01

    The MZFR reactor was decommissioned in 1984. The authors describe the dismantling of the reactor pressure vessel insulation that consists of asbestos containing mineral fiber wool. The appropriate remote handling and cutting tools had to be adapted with respect to the restrained space in the containment. The dismantling of the reactor pressure vessel has been completed, the dissected parts have been packaged into 200 containers for the final repository Konrad. During the total project time no reportable events and no damage to persons occurred.

  14. Days of dismantling activities of installations and rehabilitation of contaminated sites in France

    International Nuclear Information System (INIS)

    2008-01-01

    The objective of these days, organized by the section environment of the French society of radiation protection, is to present a panorama of the activities of nuclear installations dismantling and contaminated sites rehabilitation in France, by leaning in the same time on practical cases and by stating the French rule and the national and international recommendations on the subject. These days have also for object to approach the stakes associated with the sectors of waste management and the materials generated by these activities and in a more general way, the stakes to come for the different actors of the dismantling and the rehabilitation. (N.C.)

  15. General plan for the partial dismantling of the IRT-Sofia research reactor

    Directory of Open Access Journals (Sweden)

    Apostolov Tihomir G.

    2006-01-01

    Full Text Available After the decision of the Bulgarian Government to reconstruct it, the strategy concerning the IRT-Sofia Research Reactor is to partially dismantle the old systems and equipment. The removal of the reactor core and replacement of old equipment will not pose any significant problems. For a more efficient use of existing resources, there is a need for an engineering project which has been already prepared under the title "General Plan for the Partial Dismantling of Equipment at the IRT-Sofia as a Part of the Reconstruction into a Low Power RR".

  16. Study on safety evaluation for unrestricted recycling criteria of radioactive waste from dismantling operation

    International Nuclear Information System (INIS)

    Yoshimori, Michiro; Ohkoshi, Minoru; Abe, Masayoshi

    1995-01-01

    The study on safety evaluation was done, under contracting with the Science and Technology Agency, for recycling scrap metal arising from dismantling of reactor facilities. An object of this study is to contribute to the examination of establishing criteria and safety regulation for unrestricted recycling steel scrap. To define amount of market flow of iron material in Japan and the amount of radioactive waste generated from dismantling of reactor facilities, investigation had been carried out. On basis of these investigation results and data in several literature, individual doses to workers and to the members of the public have been calculated as well as collective doses. (author)

  17. Dismantling of Irradiation Facility Selfshielded of Investigation Model MPX- γ-25M

    International Nuclear Information System (INIS)

    Soguero, D.; Rapado, M.; Prieto, E.; Desdin, L.; Guerra, M.; Castillo, J.

    2011-01-01

    In this paper is described the dismantling a category I selfshielded gamma irradiation facility model MPX - γ - 25M. The following specific objectives were established: a) identify aspects of the insurance contract, human and technical resources b) assess the radiological situation of the process and c) analyze potential radiological extraordinary events in each step of the process, ensuring appropriate responses, based on an evaluation of process safety. The assessment of radiological events can serve as a reference for addressing the process of dismantling other similar irradiators. (Author)

  18. Polychlorinated biphenyls (PCBs) in the frame of the dismantling of nuclear facilities

    International Nuclear Information System (INIS)

    Hagenbart, Lars; Held, Christian; Reichert, Alexander

    2013-01-01

    During construction and maintenance of nuclear facilities PCB (polychlorinated biphenyls) containing paints were used in a large extent in the past. The WAK dismantling and disposal Company has dismantles such facilities and identified the PCB in the buildings. Besides the radionuclides the conventional hazardous material group of the PCBs has also to be disposed. The respective legal regulations have to be considered. In the frame of the contribution the radiological release of building structures with respect to re-use or demolition and residual PCB containing materials is discussed. The radiological disposal in final repositories and the conventional disposal regulations for releasable residual wastes are reported.

  19. Provision of the technical infrastructure for the dismantling of the WAK HAWC container. Design and realization

    International Nuclear Information System (INIS)

    Marquard, C.; Ripholz, M.; Lutz, W.

    2013-01-01

    The dismantling concept of the WAK HAWC (high-level liquid waste concentrate) containers includes remote handling equipment. Due to the solid deposits that formed during the concentrate storage time the activity and the dose rates of the containers are very high (2.6x10E15 Bq alpha and beta, dose rates higher 100 Sv/h). Therefore appropriate radiation protection measures have to be installed to protect personnel and environment. The provision of the technical infrastructure for the remote HAWC container dismantling is described in detail.

  20. Comparison of ship dismantling processes in India and the U.S.

    Science.gov (United States)

    Ahluwalia, Rashpal S.; Sibal, Pooja; Govindarajulu, Sriram

    2004-03-01

    This paper compares ship-dismantling processes in India and the U.S. The information for India was collected during an informal visit to the ship dismantling sites in Alang, India. The information for the U.S. was obtained from the MARAD report. For a 10,000-ton passenger ship, the Indian contractor makes a profit of about 24% compared to a loss of about 15% in the U.S. The loss in the US is primarily due to high labor costs, compliance to safety and health regulations and lack of market for used components and scrap metal.

  1. Health and Safety Considerations Associated with Sodium-Cooled Experimental Nuclear Fuel Dismantlement

    Energy Technology Data Exchange (ETDEWEB)

    Carvo, Alan E. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-04-01

    Between the mid-1970s and the mid-1980s Sandia National Laboratory constructed eleven experimental assemblies to simulate debris beds formed in a sodium-cooled fast breeder reactor. All but one of the assemblies were irradiated. The experimental assemblies were transferred to the Idaho National Laboratory (INL) in 2007 and 2008 for storage, dismantlement, recovery of the uranium for reuse in the nuclear fuel cycle, and disposal of unneeded materials. This paper addresses the effort to dismantle the assemblies down to the primary containment vessel and repackage them for temporary storage until such time as equipment necessary for sodium separation is in place.

  2. Dismantling of a hot cell of high level activity. Method and tools used

    International Nuclear Information System (INIS)

    Jeantet, E.; Miquel, P.; Baudoin, J.C.; Moutonnet, A.

    1981-05-01

    The aim of this operation is the removal of all the equipment and the material introduced and used in the hot cell 'Attila' and its decontamination to obtain an irradiation level as low as possible to allow direct intervention. The Attila facilitie was build in 1964-1966 to study dry processing of irradiated fuels by halogenide volatility process. Dismantling of the out-cell and of the laboratory associated to the shielded cell, dismantling inside the shielded cell with the remote handling equipment of the cell and tools used for these operations are described in this article [fr

  3. U P1, an example for advanced techniques applied to high level activity dismantling

    International Nuclear Information System (INIS)

    Michel-Noel, M.; Calixte, O.; Blanchard, S.; Bani, J.; Girones, P.; Moitrier, C.; Terry, G.; Bourdy, R.

    2014-01-01

    The U P1 plant on the CEA Marcoule site was dedicated to the processing of spend fuels from the G1, G2 and G3 plutonium-producing reactors. This plant represents 20.000 m 2 of workshops housing about 1000 hot cells. In 1998, a huge program for the dismantling and cleaning-up of the UP1 plant was launched. CEA has developed new techniques to face the complexity of the dismantling operations. These techniques include immersive virtual reality, laser cutting, a specific manipulator arm called MAESTRO and remote handling. (A.C.)

  4. Application of an automatic yarn dismantler to track changes in cotton fibre properties during processing on a miniature spinning line

    CSIR Research Space (South Africa)

    Fassihi, A

    2014-11-01

    Full Text Available . The results obtained on different Upland cottons have clearly demonstrated the practical value of the yarn dismantler in enabling yarns to be automatically dismantled into their constituent fibres, which can then be tested by instrument, such as the AFIS...

  5. Experience of the remote dismantling of the Windscale advanced gas-cooled reactor and Windscale pile chimneys

    International Nuclear Information System (INIS)

    Wright, E.M.

    1993-01-01

    This paper gives brief descriptions of some of the remote dismantling work and equipment used on two large decommissioning projects: the BNFL Windscale Pile Chimneys Project (remote handling machine, waste packaging machine, remotely controlled excavator, remotely controlled demolition machine) and the AEA Windscale Advanced Gas-cooled Reactor Project (remote dismantling machine, operational waste, bulk removal techniques, semi-remote cutting operations)

  6. A methodology to simulate the cutting process for a nuclear dismantling simulation based on a digital manufacturing platform

    International Nuclear Information System (INIS)

    Hyun, Dongjun; Kim, Ikjune; Lee, Jonghwan; Kim, Geun-Ho; Jeong, Kwan-Seong; Choi, Byung Seon; Moon, Jeikwon

    2017-01-01

    Highlights: • Goal is to provide existing tech. with cutting function handling dismantling process. • Proposed tech. can handle various cutting situations in the dismantlement activities. • Proposed tech. can be implemented in existing graphical process simulation software. • Simulation results have demonstrated that the proposed technology achieves its goal. • Proposed tech. enlarges application of graphic simulation into dismantlement activity. - Abstract: This study proposes a methodology to simulate the cutting process in a digital manufacturing platform for the flexible planning of nuclear facility decommissioning. During the planning phase of decommissioning, visualization and verification using process simulation can be powerful tools for the flexible planning of the dismantling process of highly radioactive, large and complex nuclear facilities. However, existing research and commercial solutions are not sufficient for such a situation because complete segmented digital models for the dismantling objects such as the reactor vessel, internal assembly, and closure head must be prepared before the process simulation. The preparation work has significantly impeded the broad application of process simulation due to the complexity and workload. The methodology of process simulation proposed in this paper can flexibly handle various dismantling processes including repetitive object cuttings over heavy and complex structures using a digital manufacturing platform. The proposed methodology, which is applied to dismantling scenarios of a Korean nuclear power plant in this paper, is expected to reduce the complexity and workload of nuclear dismantling simulations.

  7. The PCR (Prévessin Control Room), scene of some of the greatest moments in CERN's history, is being dismantled to prepare for a complete overhaul.

    CERN Multimedia

    Maximilien Brice

    2004-01-01

    Removal manager Claes Frisk (right on picture 02) in the almost entirely dismantled PCR, together with René Ballet, who installed the racks in the 1970s and today is responsible for dismantling them.

  8. Submersible energy storage apparatus

    International Nuclear Information System (INIS)

    Mccartney, J.F.; Rowe, R.A.

    1980-01-01

    A submersible energy storage apparatus for an electrical power source is provided which includes an electrolysis unit feed water gas collection assembly and a fuel cell. The electrolysis unit feed water gas collection assembly includes a hydrogen container and an oxygen container wherein each container has a gas outlet and is capable of containing feed water as well as hydrogen and oxygen gases respectively. An electrolysis cell is provided which has a hydrogen outlet, an oxygen outlet and a feed water inlet. The hydrogen outlet is located in the hydrogen container, the oxygen outlet is located in the oxygen container, and the feed water inlet is located in one of the containers. Each of the containers has an opening to the submersible environment so as to be pressure responsive thereto. A barrier device is provided in association with the opening in each container for isolating the feed water in the container from water in the submersible environment. The fuel cell is operatively connected to the hydrogen and oxygen containers, and the electrical power source is operatively connected to the electrolysis cell. With this arrangement the electrolysis cell is capable of utilizing power from the power source during low electrical energy demand, and the fuel cell is capable of utilizing the hydrogen and oxygen gases for generating electricity during high demand periods

  9. Belt conveyor apparatus

    Science.gov (United States)

    Oakley, David J.; Bogart, Rex L.

    1987-01-01

    A belt conveyor apparatus according to this invention defines a conveyance path including a first pulley and at least a second pulley. An endless belt member is adapted for continuous travel about the pulleys and comprises a lower portion which engages the pulleys and an integral upper portion adapted to receive objects therein at a first location on said conveyance path and transport the objects to a second location for discharge. The upper belt portion includes an opposed pair of longitudinally disposed crest-like members, biased towards each other in a substantially abutting relationship. The crest-like members define therebetween a continuous, normally biased closed, channel along the upper belt portion. Means are disposed at the first and second locations and operatively associated with the belt member for urging the normally biased together crest-like members apart in order to provide access to the continuous channel whereby objects can be received into, or discharged from the channel. Motors are in communication with the conveyance path for effecting the travel of the endless belt member about the conveyance path. The conveyance path can be configured to include travel through two or more elevations and one or more directional changes in order to convey objects above, below and/or around existing structures.

  10. Nuclear fusion apparatus

    International Nuclear Information System (INIS)

    Nagata, Daizaburo; Yamada, Masao.

    1974-01-01

    Object: To provide a nuclear fusion apparatus in which a magnetic limiter is disposed within a vacuum vessel, said magnetic limiter being supported in such a manner so as to not to exert mechanical action upon said vacuum vessel, thereby minimizing a force applied to the vacuum vessel to easily manufacture the vacuum vessel. Structure: The magnetic limiter disposed within the vacuum vessel is connected to one end of a supporting post which extends through the wall of the vacuum vessel through a seal portion, the other end of the supporting post being secured to a structure such as a house outside the vacuum vessel. The seal portion comprises a bellows of high spring elasticity mounted on the vacuum vessel and a seal element comprised of an electric insulator such as ceramic for connecting the bellows to the supporting post, the supporting post extending through the wall of the vacuum vessel in vacuum-tight fashion, the force applied to the magnetic limiter exerting no influence upon the vacuum vessel. (Kamimura, M.)

  11. Computed tomography apparatus

    International Nuclear Information System (INIS)

    Fairbairn, I.A.

    1984-01-01

    In fan-beam computed tomography apparatus, timing reference pulses, normally occurring at intervals t, for data transfer and reset of approx. 500 integrators in the signal path from the detector array, are generated from the scan displacement, e.g. using a graticule and optical sensor to relate the measurement paths geometrically to the body section. Sometimes, a slow scan rate is required to provide a time-averaged density image, e.g. for planning irradiation therapy, and then the sensed impulses will occur at extended intervals and can cause integrator overload. An improvement is described which provides a pulse generator which responds to a reduced scan rate by generating a succession of further transfer and reset pulses at intervals approximately equal to t starting a time t after each timing reference pulse. Then, using an adding device and RAM, all the transferred signals integrated in the interval t' between two successive slow scan reference pulses are accumulated in order to form a corresponding measurement signal. (author)

  12. Apparatus for diffusion separation

    International Nuclear Information System (INIS)

    Nierenberg, W.A.

    1976-01-01

    A diffuser separator apparatus is described which comprises a plurality of flow channels in a single stage. Each of said channels has an inlet port and an outlet port and a constant cross sectional area between said ports. At least a portion of the defining surface of each of said channels is a diffusion separation membrane, and each of said channels is a different cross sectional area. Means are provided for connecting said channels in series so that each successive channel of said series has a smaller cross sectional area than the previous channel of said series. Also provided are a source of gaseous mixture, individual means for flowing said gaseous mixture to the inlet port of each of said channels, gas receiving and analyzing means, individual means for flowing gas passing from each of said outlet ports and means for flowing gas passing through said membranes to said receiving and analyzing means, and individual means for connecting the outlet port of each channel with the inlet port of the channel having the next smaller cross sectional area

  13. Plastic waste disposal apparatus

    Energy Technology Data Exchange (ETDEWEB)

    Kito, S

    1972-05-01

    A test plant plastic incinerator was constructed by the Takuma Boiler Manufacturing Co. for Sekisui Chemical Industries, and the use of a continuous feed spreader was found to be most effective for prevention of black smoke, and the use of a venturi scrubber proved to be effective for elimination of hydrogen chloride gas. The incinerator was designed for combustion of polyvinyl chloride exclusively, but it is also applicable for combustion of other plastics. When burning polyethylene, polypropylene, or polystyrene, (those plastics which do not produce toxic gases), the incinerator requires no scrubber for the combustion gas. The system may or may not have a pretreatment apparatus. For an incinerator with a pretreatment system, the flow chart comprises a pit, a supply crane, a vibration feeder, a metal eliminator, a rotation shredder, a continuous screw feeder with a quantitative supply hopper, a pretreatment chamber (300 C dry distillation), a quantitative supply hopper, and the incinerator. The incinerator is a flat non-grid type combustion chamber with an oil burner and many air nozzles. From the incinerator, ashes are sent by an ash conveyor to an ash bunker. The combustion gas goes to the boiler, and the water supplied the boiler water pump creates steam. The heat from the gas is sent back to the pretreatment system through a heat exchanger. The gas then goes to a venturi scrubber and goes out from a stack.

  14. Radiographic examination apparatus

    International Nuclear Information System (INIS)

    Beetham, S.; Hogg, J.

    1983-01-01

    Tube examination apparatus has a head actuated by fluid pressure, for centralising a radioactive source. Preferably the source is shielded during transport from its storage unit to the head. A body attached to a drive-wire has hollow shield-parts which define a radiation window therebetween, and closure shield-parts which have the source located therebetween and which are a sliding fit. A spring biases the closure shields towards a first position relative to the body in which the source is enclosed. When the body moves along a guide in the head, the closure shield engages an abutment surface which arrests the closure shields. Further movement of the body to engage an abutment surface causes relative movement between the shield parts to a second position relative to the body in which the source is exposed at the window. Retraction of the body along the guide allows the spring to restore the closure shield parts to the first position. (U.K.)

  15. Sample-taking apparatus

    Energy Technology Data Exchange (ETDEWEB)

    Tanov, Y I; Ismailov, R A; Orazov, A

    1980-10-07

    The invention refers to the equipment for testing water-bearing levels in loose rocks. Its purpose is to simultaneously remove with the rock sample a separate fluid sample from the assigned interval. The sample-taking apparatus contains a core lifter which can be submerged into the casting string with housing and front endpiece in the form of a rod with a piston which covers the cavity of the core lifter, as well as mechanism for fixing and moving the endpiece within the core lifter cavity. The device differs from the known similar devices because the upper part of the housing of the core lifter is equipped with a filter and mobile casting which covers the filter. In this case the casing is connected to the endpiece rod and the endpiece is installed with the possibility of movement which is limited with fixing in the upper position and in the extreme upper position it divides the core lifter cavity into two parts, filter settling tank and core-receiving cavity.

  16. Medical radiographic apparatus

    International Nuclear Information System (INIS)

    Fetter, R.W.

    1980-01-01

    An invention is described which relates to computer-assisted tomography. The apparatus provides for investigating a cross-section slice of a patient's body and includes a source of fan-shaped distribution of penetrating radiation and a means for locating the source, in relation to the patient's body so that the radiation is directed towards a slice of the body. The source can be rotated about the patient's body and radiation detected by a number of detectors situated in an arc around the body. The number, and thus the cost, of detectors can be reduced by putting the ring of detectors between the x-ray source and the patient's body. This presents a problem in that if the detectors are on the same side of the body as the source and if no steps are taken to the contrary, the detectors will interupt the radiation so that it does not pass through the patient's body. This invention overcomes that problem. (OT)

  17. Controlled nuclear fusion apparatus

    International Nuclear Information System (INIS)

    Bussard, R.W.; Coppi, B.

    1982-01-01

    A fusion power generating device is disclosed having a relatively small and inexpensive core region which may be contained within an energy absorbing blanket region. The fusion power core region contains apparatus of the toroidal type for confining a high density plasma. The fusion power core is removable from the blanket region and may be disposed and/or recycled for subsequent use within the same blanket region. Thermonuclear ignition of the plasma is obtained by feeding neutral fusible gas into the plasma in a controlled manner such that charged particle heating produced by the fusion reaction is utilized to bootstrap the device to a region of high temperatures and high densities wherein charged particle heating is sufficient to overcome radiation and thermal conductivity losses. The high density plasma produces a large radiation and particle flux on the first wall of the plasma core region thereby necessitating replacement of the core from the blanket region from time to time. A series of potentially disposable and replaceable central core regions are disclosed for a large-scale economical electrical power generating plant

  18. Radioactive waste material melter apparatus

    Science.gov (United States)

    Newman, D.F.; Ross, W.A.

    1990-04-24

    An apparatus for preparing metallic radioactive waste material for storage is disclosed. The radioactive waste material is placed in a radiation shielded enclosure. The waste material is then melted with a plasma torch and cast into a plurality of successive horizontal layers in a mold to form a radioactive ingot in the shape of a spent nuclear fuel rod storage canister. The apparatus comprises a radiation shielded enclosure having an opening adapted for receiving a conventional transfer cask within which radioactive waste material is transferred to the apparatus. A plasma torch is mounted within the enclosure. A mold is also received within the enclosure for receiving the melted waste material and cooling it to form an ingot. The enclosure is preferably constructed in at least two parts to enable easy transport of the apparatus from one nuclear site to another. 8 figs.

  19. Radiographic film cassette unloading apparatus

    International Nuclear Information System (INIS)

    Stievenart, E.F.; Plessers, H.S.; Neujens, G.J.

    1980-01-01

    Apparatus for unloading cassettes, containing exposed radiographic films, has means for unfastening the cassettes, an inclined pathway for gravity feeding and rotating feed members (rollers or belts) to propel the films into the processor. (UK)

  20. INFLATE: INFlate Landing Apparatus Technology

    Science.gov (United States)

    Koryanov, V. V. K.; Da-Poian, V. D. P.

    2018-02-01

    Our project, named INFLATE (INFlatable Landing Apparatus Technology), aims at reducing space landing risks and constraints and so optimizing space missions (reducing cost, mass, and risk and in the same time improving performance).

  1. Tandem mirror plasma confinement apparatus

    International Nuclear Information System (INIS)

    Fowler, T.K.

    1978-01-01

    Apparatus and method are described for confining a plasma in a center mirror cell by use of two end mirror cells as positively charged end stoppers to minimize leakage of positive particles from the ends of the center mirror cell

  2. Tandem mirror plasma confinement apparatus

    Science.gov (United States)

    Fowler, T. Kenneth

    1978-11-14

    Apparatus and method for confining a plasma in a center mirror cell by use of two end mirror cells as positively charged end stoppers to minimize leakage of positive particles from the ends of the center mirror cell.

  3. Radioactive waste material melter apparatus

    International Nuclear Information System (INIS)

    Newman, D.F.; Ross, W.A.

    1990-01-01

    An apparatus for preparing metallic radioactive waste material for storage is disclosed. The radioactive waste material is placed in a radiation shielded enclosure. The waste material is then melted with a plasma torch and cast into a plurality of successive horizontal layers in a mold to form a radioactive ingot in the shape of a spent nuclear fuel rod storage canister. The apparatus comprises a radiation shielded enclosure having an opening adapted for receiving a conventional transfer cask within which radioactive waste material is transferred to the apparatus. A plasma torch is mounted within the enclosure. A mold is also received within the enclosure for receiving the melted waste material and cooling it to form an ingot. The enclosure is preferably constructed in at least two parts to enable easy transport of the apparatus from one nuclear site to another. 8 figs

  4. Apparatus for washing out halogens

    Energy Technology Data Exchange (ETDEWEB)

    Pier, M; Hahn, J; Kroenig, W

    1941-03-26

    An apparatus is described for washing out of halogens and the like or liquid halogen compounds from the products, which are formed on pressure hydrogenation or splitting of carbon-containing material in the presence of halogens or halogen compounds, consisting of a washing apparatus installed between the reaction vessel and the hot separator, which is inclined in relatively small space for steam regulation and contains, with the steam, arranged baffles, especially spirals.

  5. Visualization of a dismantling environment for an evaluation of a worker's dose during the decommissioning of KRR-1 and 2

    International Nuclear Information System (INIS)

    Park, Hee Seong; Kim, Sung Kyun; Lee, Kune Woo; Jung, Chong Hun; Jin, Seong Il

    2008-01-01

    The purpose of this paper is to provide a basis for an optimization of a dismantling process of a research reactor and nuclear facility. An optimization of a dismantling process should be at the beginning of a study for an evaluation of the radioactivity inventory and the safety of the workers. Many countries have conducted an optimization to achieve a shortened dismantling schedule, a reduction of the amount of waste, and cut down on the decommissioning by using computer graphics such as animation, simulation, and virtual reality. In the present study, we propose methods for identifying the existence of radioactivity which is contained in the dismantled objects and for evaluating a worker's dose through a simulation. To evaluate a worker's external dose under a virtual dismantling environment generated by computer graphics, the shape of the thermal column horizontal door was created by 3D CAD and the radiation dose surrounding the door was calculated by using MCNP-4C. An animation that can demonstrate a dismantling procedure according to a dismantling scenario was produced. For matching the radiation dose, which was calculated by MCNP-4C with an area where workers are dismantling a door, a simulation module was developed which could show a worker's external dose in real-time. The result from the distribution of the radioactivity enables us to specify where the most contaminated part of the dismantling objects is. In the animation, a virtual worker demonstrated a dismantling activity procedure as a chosen scenario. In the simulation, a worker's exposure dose rate in real-time has been evaluated

  6. Radiation research of materials using irradiation capsules

    International Nuclear Information System (INIS)

    Chamrad, B.

    1976-01-01

    The methods are briefly characterized of radiation experiments on the WWR-S research reactor. The irradiation capsule installed in the reactor including the electronic instrumentation is described. Irradiated samples temperature is stabilized by an auxiliary heat source placed in the irradiation space. The electronic control equipment of the system is automated. In irradiation experiments, experimental and operating conditions are recorded by a digital measuring centre with electric typewriter and paper tape data recording and by an analog compensating recorder. The irradiation experiment control system controls irradiated sample temperature, the supply current size and the heating element temperature of the auxiliary stabilizing source, inert and technological pressures of the capsule atmosphere and the thermostat temperature of the thermocouple junctions. (O.K.)

  7. Automatic blood detection in capsule endoscopy video

    Czech Academy of Sciences Publication Activity Database

    Novozámský, Adam; Flusser, Jan; Tachecí, I.; Sulík, L.; Bureš, J.; Krejcar, O.

    2016-01-01

    Roč. 21, č. 12 (2016), s. 1-8, č. článku 126007. ISSN 1083-3668 R&D Projects: GA ČR GA15-16928S Institutional support: RVO:67985556 Keywords : Automatic blood detection * capsule endoscopy video Subject RIV: JD - Computer Applications, Robotics Impact factor: 2.530, year: 2016 http://library.utia.cas.cz/separaty/2016/ZOI/flusser-0466936.pdf

  8. Small bowel endoluminal imaging (capsule and enteroscopy).

    Science.gov (United States)

    Murino, Alberto; Despott, Edward J

    2017-04-01

    Over the last 16 years, the disruptive technologies of small bowel capsule endoscopy and device-assisted enteroscopy have revolutionised endoluminal imaging and minimally invasive therapy of the small bowel. Further technological developments continue to expand their indications and use. This brief review highlights the state-of-the-art in this arena and aims to summarise the current and potential future role of these technologies in clinical practice.

  9. Apparatus Development In Maros

    Directory of Open Access Journals (Sweden)

    H. Aras Solong

    2015-03-01

    Full Text Available ABSTRACT This study aims to identify and describe 1 Development of Administrative through education and training training promotion transfer and rotation and the application of demotion system non-title under Law No. 43 of 1999 on the development of career civil servants based merit system and work performance and Government Regulation No. 101 of 2000 on Education and Training Training for Civil Servants. 2 Revealing differences in work motivation based on the intensity of the education or training training using Herzbergs Two Factor Theory of extrinsic factors hygiene and intrinsic factors motivator that influence employees motivation Maros regency government in carrying out its duties and functions as members civil in public service. This study uses a quantitative approach to date collection techniques through a questionnaire Questionnaire. Informant are civil servants who occupied echelon II III. And IV while the analysis of the date used quantitative analysis to uncover the implementation of personnel development and employees motivation difference Maros region based on the intensity of the education or training training to get job satisfaction in the public service. The results of this study will reveal that 1 Development of Apparatus for improving the knowledge ability professionalism competence skills can work as a reformer change attitude eager to work motivated to do the work get satisfaction in work and getting justice in employment. 2 The difference in work motivation Maros local government employees affected by extrinsic factors hygiene and intrinsic factor motivator is the variable gain high salary H occupies the first ranking while serving the community satisfaction variables M occupy the last ranking. That is that the satisfaction of serving the people affected by the high salaries earned by the employees to do the job.

  10. Collapse of experimental capsules under external pressure

    International Nuclear Information System (INIS)

    Simonen, F.A.; Shippell, R.J. Jr.

    1980-01-01

    Stress analyses and developmental tests of capsules fabricated from thick-walled tubing were performed for an external pressure design condition. In the design procedure no credit was taken for the expected margin in pressure between yielding of the capsule wall and catastrophic collapse or flattening. In tests of AISI-1018 low carbon steel capsules, a significant margin was seen between yield and collapse pressure. However, the experimental yield pressures were significantly below predictions, essentially eliminating the safety margin present in the conservative design approach. The differences between predictions and test results are attributed to deficiencies in the plasticity theories commonly in use for engineering stress analyses. The results of this study show that the von Mises yield condition does not accurately describe the yield behavior of the AISI-1018 steel tubing material for the triaxial stress conditions of interest. Finite element stress analyses successfully predicted the transition between uniform inward plastic deformation and ovalization that leads to catastrophic collapse. After adjustments to correct for the unexpected yield behavior of the tube material, the predicted pressure-deflection trends were found to follow the experimental data

  11. Remotely-Controlled Shear for Dismantling Highly Radioactive Tools In Rokkasho Vitrification Facility - 12204

    Energy Technology Data Exchange (ETDEWEB)

    Mitsui, Takashi; Sawa, Shusuke; Sadaki, Akira; Awano, Toshihiko [IHI Corporation, 1 Shin-Nakahara-cho, Isogo-ku, Yokohama, Kanagawa (Japan); Cole, Matt [S.A. Technology Inc, 3985 S. Lincoln Ave., Ste. 100, Loveland CO 80537 (United States); Miura, Yasuhiko; Ino, Tooru [Japan Nuclear Fuel Limited, 4-108, Aza Okitsuke, Oaza Obuchi, Rokkasho-Mura, Kamikita-gun, Aomori (Japan)

    2012-07-01

    A high-level liquid waste vitrification facility in the Japanese Rokkasho Reprocessing Plant (RRP) is right in the middle of hot commissioning tests toward starting operation in fall of 2012. In these tests, various tools were applied to address issues occurring in the vitrification cell. Because of these tools' unplanned placement in the cell it has been necessary to dismantle and dispose of them promptly. One of the tools requiring removal is a rod used in the glass melter to improve glass pouring. It is composed of a long rod made of Inconel 601 or 625 and has been highly contaminated. In order to dismantle these tools and to remotely put them in a designated waste basket, a custom electric shear machine was developed. It was installed in a dismantling area of the vitrification cell by remote cranes and manipulators and has been successfully operated. It can be remotely dismantled and placed in a waste basket for interim storage. This is a very good example of a successful deployment of a specialty remote tool in a hot cell environment. This paper also highlights how commissioning and operations are done in the Japanese Rokkasho Reprocessing Plant. (authors)

  12. Installation dismantling system, working process and hood utilizable in this system

    International Nuclear Information System (INIS)

    Poirier, J.C.; Mulcey, P.; Morel, P.; Vavasseur, C.

    1989-01-01

    The system for dismantling an installation under a controlled atmosphere is made by a tool polluting the atmosphere, a gas blanket creating a continement zone around the tool, an extractor removing polluted gas from the zone, a purifier for the extracted gas and a controller regulating the flow of gas in the blanket and keeping the installation at constant pressure [fr

  13. ''1995/2010: site drainage and nuclear facilities dismantling program'' result 2001

    International Nuclear Information System (INIS)

    2001-01-01

    A drainage and dismantling planing with the corresponding wastes management, has been decided for the CEA of Fontenay aux roses, in 1995. It will end in 2010. This document presents the main evolutions occurred since october 2000. (A.L.B.)

  14. The dismantling of nuclear power plants which are not in use

    International Nuclear Information System (INIS)

    Tanguy, P.

    1987-01-01

    At the end of its life span, a nuclear power plant contains big quantities of radioactive products. The corresponding risks must be controlled and over the long range, all radioactivity must be definitively removed. The latter operation is called dismantling. In France, at the beginning of 1987, five nuclear units which were permanently put out of use have to be dismantled. These units are presented in this article. From this presentation, it can be seen that there are now techniques which provide for complete control of the risks corresponding to radioactivity. However, in France, as in the rest of the world, the dismantling of nuclear plants will not attain its full industrial level until the 21st Century. The problems which have to be solved are known, but better performing technologies have to be developed in order to obtain a superior protection of dismantling work crews and a reduction of costs. This article concludes with an appeal for high French interest in international activities in this field [fr

  15. Sustainable design for automotive products: dismantling and recycling of end-of-life vehicles.

    Science.gov (United States)

    Tian, Jin; Chen, Ming

    2014-02-01

    The growth in automotive production has increased the number of end-of-life vehicles (ELVs) annually. The traditional approach ELV processing involves dismantling, shredding, and landfill disposal. The "3R" (i.e., reduce, reuse, and recycle) principle has been increasingly employed in processing ELVs, particularly ELV parts, to promote sustainable development. The first step in processing ELVs is dismantling. However, certain parts of the vehicle are difficult to disassemble and use in practice. The extended producer responsibility policy requires carmakers to contribute in the processing of scrap cars either for their own developmental needs or for social responsibility. The design for dismantling approach can be an effective solution to the existing difficulties in dismantling ELVs. This approach can also provide guidelines in the design of automotive products. This paper illustrates the difficulty of handling polymers in dashboards. The physical properties of polymers prevent easy separation and recycling by using mechanical methods. Thus, dealers have to rely on chemical methods such as pyrolysis. Therefore, car designers should use a single material to benefit dealers. The use of materials for effective end-of-life processing without sacrificing the original performance requirements of the vehicle should be explored. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Pick-N-Pull Auto Dismantlers, Kansas City, LLC Inc. - Clean Water Act Public Notice

    Science.gov (United States)

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Pick-N-Pull Auto Dismantlers, Kansas City, LLC, a subsidiary of Schnitzer Steel Industries, Inc., for alleged violations at its facilities at 8012 East Truman Rd., Kansas C

  17. Dismantling of JPDR reactor internals by underwater plasma arc cutting technique using robotic manipulator

    International Nuclear Information System (INIS)

    Yokota, M.

    1988-01-01

    The actual dismantling of JPDR started on December 4, 1986. As of now, equipment that surrounds the reactor has mostly been removed to provide working space in reactor containment prior to the dismantling of reactor internals. Some reactor internals have been successfully dismantled using the underwater arc cutting system with a robotic manipulator during the period of January to March 1988. The cutting system is composed of an underwater plasma arc cutting device and a robotic manipulator. The cut off reactor internals were core spray block, feedwater sparger and stabilizers for fuel upper grid tube. The plasma arc cutting device was developed to dismantle the reactor internals underwater. It mainly consists of a plasma torch, power and gas supply systems for the torch, and by-product treatment systems. It has the cutting ability of 130 mm thickness stainless steel underwater. The robotic manipulator has seven degrees of freedom of movement, enabling it to move in almost the same way as the arm of a human being. The arm of the robot is mounted on a supporting device which is suspended by three chains from the support structure set on a service floor. A plasma torch is griped by the robotic hand; its position to the structure to be cut is controlled from a remote control room, about 100 meters outside the reactor containment

  18. Development of plasma arc cutting technique for dismantlement of reactor internals in JPDR decommissioning program

    International Nuclear Information System (INIS)

    Yanagihara, Satoshi; Tanaka, Mitsugu; Ujihara, Norio.

    1988-01-01

    The decommissioning program for JPDR has been conducted by JAERI since 1981 under contact with the Science and Technology Agency of Japan. The development of cutting tools for dismantling the JPDR is one of the important items in the program. An underwater plasma arc cutting technique was selected for dismantling the JPDR core internals. The study was concentrated on improving the cutting ability in water. Various cutting tests were conducted changing the parameters such as arc current, supply gas and cutting speed to evaluate the most effective cutting condition. Through the study, it has been achieved to be able to cut a 130 mm thick stainless steel plate in water. In addition, the amount and the characteristics of by-products were measured during the cutting tests for the safety evaluation of the dismantling activities. Final cutting tests and checkout of whole plasma arc cutting system were conducted using a mockup water pool and test pieces simulating the JPDR core internals. It was proved from the tests that the cutting system developed in the program will be applicable for the JPDR core internals dismantlement. (author)

  19. Value estimation of end of life vehicles as a source of competitive advantage for dismantling station

    Directory of Open Access Journals (Sweden)

    Monika Kosacka

    2016-03-01

    Full Text Available   Background: End of Life vehicles become an emerging problem because of the type of waste which they are. Each country is creating own recycling network where ELVs are well secured and recycled. Poland is a country where the system is not working correct because of a high absorption of ELVs by illegal dismantling entities which are more competitive than legal elements of recycling network. The problem is well known but there is still lack of solution. The purpose of this article is to present the concept of tools for the valuation of ELVs in order to improve the competitiveness of disassembly stations. Methods: The research methodology consists of a literature review as well as observations, surveys, BPMN and UML diagrams. On the basis of literature review and observations the problem was identified. The surveys were elaborated in order to identify requirements for the concept of the tool. BPMN and UML diagrams were used to model the processes in dismantling station and the information flow between the user and the tool. Results: There was established a concept of the tool - ELV's Calculator which support decisions of ELV's value estimation. Conclusions: Improving competitiveness of legal dismantling station is extremely important issue in order to provide safe for Environment and People and economically justified ELVs' management. Legal entities have to follow the law what makes their business cost higher. This paper provides a solution of encouraging people to return ELVs to legal dismantlers by offering them price adequate to market demand.    

  20. The concepts of the 'factory of the future' applied to cleanup and dismantling works

    International Nuclear Information System (INIS)

    Ghiban, A.; Girones, P.; Moitrier, C.; Gouhier, E.; Torreblanca, L.

    2016-01-01

    The 'factory of the future' relies on the implementation of new concepts and technologies like: connected robots, data analysis, virtual reality or enhanced reality in the fabrication processes. The article describes how these concepts can be used in cleanup or dismantling works. Both activities can be considered as the fabrication of a waste package and the processing plant as a factory. (A.C.)

  1. Adaptation of high pressure water jets with abrasives for nuclear installations dismantling

    International Nuclear Information System (INIS)

    Rouviere, R.; Pinault, M.; Gasc, B.; Guiadeur, R.; Pilot, M.

    1989-01-01

    This report presents the work realized for adjust the cutting technology with high pressure water jet with abrasives for nuclear installation dismantling. It has necessited the conception and the adjustement of a remote tool and the realization of cutting tests with waste produce analysis. This technic can be ameliorated with better viewing systems and better fog suction systems

  2. Cold trap dismantling and sodium removal at a fast breeder reactor

    Energy Technology Data Exchange (ETDEWEB)

    Graf, Anja; Petrick, Holger; Stutz, Uwe [WAK GmbH, Eggenstein-Leopoldshafen (Germany). Hauptabt. Dekontaminationsbetriebe Rueckbau Kompakte Natriumgekuehlte Kernreaktoranlage (KNK); Hosking, Paul [Nuclear Decommissioning Services Limited (NDSL), Sutherland, Dornoch (United Kingdom)

    2013-11-15

    The first German prototype Fast Breeder Nuclear Reactor (KNK) is currently being dismantled after being the only operating Fast Breeder-type reactor in Germany. As this reactor type used sodium as a coolant in its primary and secondary circuit, 7 cold traps containing various amounts of partially activated sodium needed to be disposed of as part of the dismantling. The resulting combined difficulties of radioactive contamination and high chemical reactivity were handled by treating the cold traps differently depending on their size and the amount of sodium contained inside. Six small cold traps were processed on-site by cutting them up into small parts using a band saw under a protective atmosphere. The sodium was then converted to sodium hydroxide by using water. The remaining large cold trap could not be handled in the same way due to its dimensions (2.9 m x 1.1 m) and the declared amount of sodium inside (1,700 kg). It was therefore manually dismantled inside a large box filled with a protective atmosphere, while the resulting pieces were packaged for later burning in a special facility. The experiences gained by KNK during this process may be advantageous for future dismantling projects in similar sodium-cooled reactors worldwide. (orig.)

  3. Quantity assessment of waste in the dismantlement of liquid waste treatment plant and its actual state

    International Nuclear Information System (INIS)

    Uchiyama, Takafumi; Mitsuhashi, Ishi; Matsumoto, Tetsuo; Morishima, Kayoko; Tanzawa, Tomio

    2016-01-01

    From the progress of decommissioning project work of Tokyo City University Atomic Energy Research Institute, this paper reports the comparison between the actual amount of the waste generated during dismantlement work at liquid waste treatment facilities and the assessment quantity before starting the dismantlement. The quantity assessment was made on the basis of the installation license application, design specifications, drawings, records, history of use, site investigation results, etc. Since this quantity assessment did not take into account the dismantling contents of reservoir concrete, the assessed quantity of non-radioactive waste (NR waste) did not match the sum of actual NR waste. However, if an actually generated quantity of concrete of radioactive waste was added to the quantity assessment as NR waste, the quantity of actually generated NR waste and that of assessed NR waste were nearly consistent, which verified the validity of this assessment. This method is considered to be able to be utilized in the future quantity assessment of decommissioning work and the like. On the other hand, it was found that the number of drums that were actually stored tended to increase more than the estimated number of drum conversion. In old buildings, it is necessary to take into account the generation of waste other than radioactive materials in the quantity assessment stage and dismantlement stage. (A.O.)

  4. Dismantling the dwelling : A systematic approach to investigating the meaning of the dwelling: draft

    NARCIS (Netherlands)

    Meesters, J.; Coolen, H.C.C.H.

    2009-01-01

    The meaning of the dwelling consists of multiple layers, which makes it a complex concept. Therefore it should be dismantled (ref. Rapoport, 2001). This paper presents a conceptual framework in which settings, activities and values are systematically related. The data is derived from a telephone

  5. Effects of food on a gastrically degraded drug: azithromycin fast-dissolving gelatin capsules and HPMC capsules.

    Science.gov (United States)

    Curatolo, William; Liu, Ping; Johnson, Barbara A; Hausberger, Angela; Quan, Ernest; Vendola, Thomas; Vatsaraj, Neha; Foulds, George; Vincent, John; Chandra, Richa

    2011-07-01

    Commercial azithromycin gelatin capsules (Zithromax®) are known to be bioequivalent to commercial azithromycin tablets (Zithromax®) when dosed in the fasted state. These capsules exhibit a reduced bioavailability when dosed in the fed state, while tablets do not. This gelatin capsule negative food effect was previously proposed to be due to slow and/or delayed capsule disintegration in the fed stomach, resulting in extended exposure of the drug to gastric acid, leading to degradation to des-cladinose-azithromycin (DCA). Azithromycin gelatin capsules were formulated with "superdisintegrants" to provide fast-dissolving capsules, and HPMC capsule shells were substituted for gelatin capsule shells, in an effort to eliminate the food effect. Healthy volunteers were dosed with these dosage forms under fasted and fed conditions; pharmacokinetics were evaluated. DCA pharmacokinetics were also evaluated for the HPMC capsule subjects. In vitro disintegration of azithromycin HPMC capsules in media containing food was evaluated and compared with commercial tablets and commercial gelatin capsules. When the two fast-dissolving capsule formulations were dosed to fed subjects, the azithromycin AUC was 38.9% and 52.1% lower than after fasted-state dosing. When HPMC capsules were dosed to fed subjects, the azithromycin AUC was 65.5% lower than after fasted-state dosing. For HPMC capsules, the absolute fasting-state to fed-state decrease in azithromycin AUC (on a molar basis) was similar to the increase in DCA AUC. In vitro capsule disintegration studies revealed extended disintegration times for commercial azithromycin gelatin capsules and HPMC capsules in media containing the liquid foods milk and Ensure®. Interaction of azithromycin gelatin and HPMC capsules with food results in slowed disintegration in vitro and decreased bioavailability in vivo. Concurrent measurement of serum azithromycin and the acid-degradation product DCA demonstrates that the loss of azithromycin

  6. Cleaning and dismantling of a high activity laboratory (abstract and presentation slides)

    Energy Technology Data Exchange (ETDEWEB)

    Bredel; Thierry; Buzare, Alain

    2005-01-01

    The high activity laboratories have been built at the end of the 50ies. The particularity of this facility was that about 14 different laboratories worked in 14 different fields (biology, production of Cs and Cf sources, metallurgy, mechanical testing ...). Because of the optimization of the nuclear research, the CEA decided to close progressively this facility and to transfer the different experiments in other places. This action began in 1997 and is planed to end in 2010. 6 laboratories have been closed from 1997 to 2001 and the dismantling of the shielded cells has begun since 2002. Therefore, several laboratories have been cleaned of the materials and experiments. Nevertheless, the main particularity of this subject is that some experimental activities have been pursued during the cleaning and dismantling of other laboratories. For example, we describe the dismantling of the laboratory that performed metallurgical and mechanical characterization of irradiated materials. This laboratory occupied 20 lead cells and 2 glove boxes. The exploitation of those cells has been stopped progressively (12 at the end of 2001 and 5 at the end of 2003). The end of the last 3 cell exploitation is planed to end 2005. Since the end of 2001, 9 lead cells have been cleaned. Their dismantling is planed for next the two years. In parallel, we will clean all the other cells. During this phase we will have also to transfer all the irradiated samples (about 5000) that are still in the laboratory to the waste treatment facility of the CEA centre or to the new laboratory which has been presented during the previous hotlab meeting in Saclay. The paper gives details for background about ended operations: Organization, waste production, specific designs which improve radioprotection, waste destinations and costs, Difficulties and feedback experience of dismantling. (Author)

  7. Radiological impact of very slightly radioactive copper and aluminium recovered from dismantled nuclear facilities

    International Nuclear Information System (INIS)

    Garbay, H.; Chapuis, A.M.; Cahuzac, O.; Guetat, P.; Haristoy, D.; Renaud, P.

    1991-01-01

    This work is in keeping with a large evaluation of doses likely to be received by public and non nuclear workers when dismantling nuclear installations. A bibliographic study and inquiries are realized, in the nuclear field to evaluate quantities of very slightly radioactive materials, in the conventional copper and aluminium recovery fields: waste recovery, metal refinery and processing, occupational or domestic uses of the metals or their alloys. In fact copper and aluminium waste arising from the dismantling of nuclear installations are mainly electrical cables constituents including insulation material which is mainly polyvinyle chloride (PVC). Estimated quantities are relatively low compared to steel quantities arising from dismantling. The study is based on the hypothesis of two PWRs dismantled per year, estimated quantities are 200 tonnes of copper, 40 tonnes of aluminium and 500 tonnes of PVC. A special case is also studied, which is the dismantling of low and medium uranium enrichment plant in Pierrelatte (France); the plant pipework is mainly made of an aluminium and magnesium alloy: AG3. From these informations, one can define exposure scenarios which may occur with a non negligible probability. The doses likely to be received under the foreseen conditions are calculated. Reference doses are established from recommendations of international organisations as ICRP, IAEA, NEA. Comparing the calculated doses and the reference doses, the activity level of the initial waste can be deduced as to follow the recommendations. The mean specific activity of main beta-gamma emitters in copper, aluminium and PVC are of the same order of magnitude, 10Bq.g -1 . In the case of alpha emitters specific activity levels depend on the material and on the radionuclide, from 2 Bq.g -1 to 10 Bq.g -1 in copper, from 10 Bq.g -1 to 50 Bq.g -1 in aluminium

  8. Education and research when dismantling nuclear plants at the Technical University Dresden

    International Nuclear Information System (INIS)

    Hurtado, A.; Anthofer, A.; Cloppenborg, T.; Schreier, M.

    2013-01-01

    With the decision by the German government in 2011 to revoke the operating permission from 8 of the existing 17 German nuclear power plants, the responsibility of decommissioning and dismantling these plants has moved back into the focus of public awareness. Under the current legal conditions, the last nuclear plant will be disconnected from the grid on 31.12.2022 and this will create an enormous challenge for all the involved approving authorities, expert organisations, as well as companies involved in dismantling the plants. The development of new and efficient dismantling technologies and strategies is required to perform these highly responsible tasks. On the other hand, the nuclear competence and knowhow, as well as the promotion of young talents in the relevant scientific fields must be preserved. Technological and economic solutions are in demand for the various plants due to the different specifics of nuclear power plants. This will still require e.g. in the field of radiation protection highly qualified and well trained staff in future. The training of these skilled employees will require expanding the subject matter taught at universities, colleges and polytechnics to suit the changed parameters. The chair for hydrogen and nuclear energy technology at the TU Dresden will in future offer lectures as part of a new teaching discipline with the focus on dismantling and disposal. The course 'Dismantling nuclear power plants' took place for the first time in the summer semester 2013. It is organised as a three-day block seminar with an excursion to the company NIS Ingenieurgesellschaft mbH in Alzenau. The company NIS is a subsidiary of the Siempelkamp Nukleartechnik GmbH. This article intends to provide an overview of the contents of the courses and the impressions of the participants. In this way the TU Dresden is making a further contribution to preserving nuclear competence and inter-disciplinary dialogue. (orig.)

  9. Technical report on dismantling of incinerator building of JNC with strict environmental assessments especially for the contamination of surroundings of incinerator by Dioxin's in soil

    International Nuclear Information System (INIS)

    Aizawa, Masanori; Ohmori, Koji; Nomura, Takeshi; Numano, Tatuo; Usui, Kazuya; Irinouchi, Shigenori

    2003-03-01

    Building of incinerator for general waste located at Tokai of Japan Nuclear Cycle Development Institute (JNC in short) were dismantled form April 2002 to March 2003 under environmental control According to the regulation entitled 'Outline for the prevention of exposure of Dioxin's to operators engaged in dismantling of waste incinerator' issued on June 01, 2000 by Ministry of Health, Labor and Welfare in Japan, the regulation requests proper protection methodology to dismantling the incinerator and surroundings contaminated by Dioxin's. This report consists of Environmental assessment under Japanese law and regulations and Procedure of actual dismantling of incinerator building with law-abiding stand point. 1. Environmental assessment; Survey of several laws and regulations concerning on the Dioxin's and actual site assessment to analyze the content of Dioxin's for surroundings of incinerator building. Ground design of dismantling procedures, waste management for disposed during dismantling and scheduling for dismantling of building. 2. Dismantling procedures; Prior to dismantling operation, contamination map by Dioxin's were established then restricted areas were determined. Protection methodology to dioxin's exposure for operators were selected and started dismantling operation after getting permission from the Labor Standards Bureau of Ibaraki Prefecture. Dismantling operations were carried out with respect o above mentioned regulations to prevent the operators exposure to Dioxin's if they are exists in soil or surroundings of building. Finally, dismantling operations were completed without accidents and confirmed no-exposure of Dioxin's to operators of dismantling. Waste generated during dismantling were recycled using specialized recycling companies in Ibaraki prefecture. Dismantling operation of incinerator was first experience at Ibaraki Prefecture, so the officials of Labor Standards Bureau were carried out on-the-spot inspection and have no claim from

  10. Dismantling of nuclear facilities: the industrial know-how; Demantelement des installations nucleaires: les voies de la maitrise industrielle

    Energy Technology Data Exchange (ETDEWEB)

    Lellament, R. [Societe Francaise d' Energie Nucleaire (SFEN), Groupe de Reflexion Energie/Environnement, 75 - Paris (France)

    2004-11-01

    Numerous nuclear facilities in laboratories or research reactors have been decommissioned and dismantled over the 2 last decades throughout the world. The valuable feedback experience has allowed nuclear industry to design, upgrade and test specific techniques for dismantling. These techniques are efficient although they have been validated on a reduced number of nuclear power plants. In France only 3 power units have been dismantled: Chinon A1, A2 and Brennilis (EL4) and they are not representative of the real park of EDF'reactors. 6 PWR-type reactors have already been dismantled in the Usa. The results of a survey concerning 26 countries shows that the dismantling cost is around 320 dollars/kWe, it represents 15% of the construction cost which is far from being excessive as it is often read in the media. The dismantling costs can be broken into: - de-construction (25-55%), - wastes from dismantling (17-43%), - security and monitoring (8-13%), - site reclamation (5-13%), and - engineering and project management (5-24%). (A.C.)

  11. Motion of an elastic capsule in a square microfluidic channel.

    Science.gov (United States)

    Kuriakose, S; Dimitrakopoulos, P

    2011-07-01

    In the present study we investigate computationally the steady-state motion of an elastic capsule along the centerline of a square microfluidic channel and compare it with that in a cylindrical tube. In particular, we consider a slightly over-inflated elastic capsule made of a strain-hardening membrane with comparable shearing and area-dilatation resistance. Under the conditions studied in this paper (i.e., small, moderate, and large capsules at low and moderate flow rates), the capsule motion in a square channel is similar to and thus governed by the same scaling laws with the capsule motion in a cylindrical tube, even though in the channel the cross section in the upstream portion of large capsules is nonaxisymmetric (i.e., square-like with rounded corners). When the hydrodynamic forces on the membrane increase, the capsule develops a pointed downstream edge and a flattened rear (possibly with a negative curvature) so that the restoring tension forces are increased as also happens with droplets. Membrane tensions increase significantly with the capsule size while the area near the downstream tip is the most probable to rupture when a capsule flows in a microchannel. Because the membrane tensions increase with the interfacial deformation, a suitable Landau-Levich-Derjaguin-Bretherton analysis reveals that the lubrication film thickness h for large capsules depends on both the capillary number Ca and the capsule size a; our computations determine the latter dependence to be (in dimensionless form) h ~ a(-2) for the large capsules studied in this work. For small and moderate capsule sizes a, the capsule velocity Ux and additional pressure drop ΔP+ are governed by the same scaling laws as for high-viscosity droplets. The velocity and additional pressure drop of large thick capsules also follow the dynamics of high-viscosity droplets, and are affected by the lubrication film thickness. The motion of our large thick capsules is characterized by a Ux-U ~ h ~ a(-2

  12. Capsule development and utilization for material irradiation tests

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Young Hwan; Kim, B. G.; Joo, K. N. [and others

    2000-05-01

    The development program of advanced nuclear structural and fuel materials includes the in-pile tests using the instrumented capsule at HANARO. The tests were performed in the in-core test holes of CT, IR 1 and 2 and OR 4 and 5 of HANARO. Extensive efforts have also been made to establish design and manufacturing technology for the instrumented capsule and its related system, which should be compatible with the HANARO's characteristics. Since the first instrumented capsule(97M-01K) had been designed and successfully fabricated, five tests were done to support the users and provided the economic benefits to user by generating the essential in-pile information on the performance and structural integrity of materials. This paper describes the present status and future plans of these R and D activities for the development of the instrumented capsule including in-situ material property measurement capsules and nuclear fuel test capsules.

  13. Capsule development and utilization for material irradiation tests

    International Nuclear Information System (INIS)

    Kang, Young Hwan; Kim, B. G.; Joo, K. N.

    2000-05-01

    The development program of advanced nuclear structural and fuel materials includes the in-pile tests using the instrumented capsule at HANARO. The tests were performed in the in-core test holes of CT, IR 1 and 2 and OR 4 and 5 of HANARO. Extensive efforts have also been made to establish design and manufacturing technology for the instrumented capsule and its related system, which should be compatible with the HANARO's characteristics. Since the first instrumented capsule(97M-01K) had been designed and successfully fabricated, five tests were done to support the users and provided the economic benefits to user by generating the essential in-pile information on the performance and structural integrity of materials. This paper describes the present status and future plans of these R and D activities for the development of the instrumented capsule including in-situ material property measurement capsules and nuclear fuel test capsules

  14. Polar tent for reduced perturbation of NIF ignition capsules

    Science.gov (United States)

    Hammel, B. A.; Pickworth, L.; Stadermann, M.; Field, J.; Robey, H.; Scott, H. A.; Smalyuk, V.

    2016-10-01

    In simulations, a tent that contacts the capsule near the poles and departs tangential to the capsule surface greatly reduces the capsule perturbation, and the resulting mass injected into the hot-spot, compared to current capsule support methods. Target fabrication appears feasible with a layered tent (43-nm polyimide + 8-nm C) for increased stiffness. We are planning quantitative measurements of the resulting shell- ρR perturbation near peak implosion velocity (PV) using enhanced self-emission backlighting, achieved by adding 1% Ar to the capsule fill in Symcaps (4He + H). Layered DT implosions are also planned for an integrated test of capsule performance. We will describe the design and simulation predictions. Prepared by LLNL under Contract DE-AC52-07NA27344.

  15. Capsule-odometer: a concept to improve accurate lesion localisation.

    Science.gov (United States)

    Karargyris, Alexandros; Koulaouzidis, Anastasios

    2013-09-21

    In order to improve lesion localisation in small-bowel capsule endoscopy, a modified capsule design has been proposed incorporating localisation and - in theory - stabilization capabilities. The proposed design consists of a capsule fitted with protruding wheels attached to a spring-mechanism. This would act as a miniature odometer, leading to more accurate lesion localization information in relation to the onset of the investigation (spring expansion e.g., pyloric opening). Furthermore, this capsule could allow stabilization of the recorded video as any erratic, non-forward movement through the gut is minimised. Three-dimensional (3-D) printing technology was used to build a capsule prototype. Thereafter, miniature wheels were also 3-D printed and mounted on a spring which was attached to conventional capsule endoscopes for the purpose of this proof-of-concept experiment. In vitro and ex vivo experiments with porcine small-bowel are presented herein. Further experiments have been scheduled.

  16. Capsule development and utilization for material irradiation tests

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Young Hwan; Kim, B G; Joo, K N [and others

    2000-05-01

    The development program of advanced nuclear structural and fuel materials includes the in-pile tests using the instrumented capsule at HANARO. The tests were performed in the in-core test holes of CT, IR 1 and 2 and OR 4 and 5 of HANARO. Extensive efforts have also been made to establish design and manufacturing technology for the instrumented capsule and its related system, which should be compatible with the HANARO's characteristics. Since the first instrumented capsule(97M-01K) had been designed and successfully fabricated, five tests were done to support the users and provided the economic benefits to user by generating the essential in-pile information on the performance and structural integrity of materials. This paper describes the present status and future plans of these R and D activities for the development of the instrumented capsule including in-situ material property measurement capsules and nuclear fuel test capsules.

  17. Optical fiber stripper positioning apparatus

    Science.gov (United States)

    Fyfe, Richard W.; Sanchez, Jr., Amadeo

    1990-01-01

    An optical fiber positioning apparatus for an optical fiber stripping device is disclosed which is capable of providing precise axial alignment between an optical fiber to be stripped of its outer jacket and the cutting blades of a stripping device. The apparatus includes a first bore having a width approximately equal to the diameter of an unstripped optical fiber and a counter bore axially aligned with the first bore and dimensioned to precisely receive a portion of the stripping device in axial alignment with notched cutting blades within the stripping device to thereby axially align the notched cutting blades of the stripping device with the axis of the optical fiber to permit the notched cutting blades to sever the jacket on the optical fiber without damaging the cladding on the optical fiber. In a preferred embodiment, the apparatus further includes a fiber stop which permits determination of the length of jacket to be removed from the optical fiber.

  18. The Conservation Ideological State Apparatus

    Directory of Open Access Journals (Sweden)

    Jared D Margulies

    2018-01-01

    Full Text Available This article considers Louis Althusser's theory of the ideological state apparatuses (ISAs for advancing political ecology scholarship on the functioning of the state in violent environments. I reflect on a series of events in which a state forest department in South India attempted to recast violent conflicts between themselves and local communities over access to natural resources and a protected area as a debate over human-wildlife conflicts. Through the example of conservation as ideology in Wayanad, Kerala, I show how the ISAs articulate the functioning of ideology within the state apparatuses in order for us to understand the larger mechanics of the state apparatus and the reproduction of the relations of production necessary for the reproduction of capitalism. Revisiting the ISAs as a theoretical framework for studies in political ecology and conservation is timely given the resurgence of militarised conservation tactics, the emancipatory aims of Althusser's theory, and political ecology's turn towards praxis.

  19. Apparatus for filtering radioactive fluids

    International Nuclear Information System (INIS)

    Gischel, E.H.

    1975-01-01

    Apparatus is provided for filtering radioactive particles from the cooling and/or auxiliary process water of a nuclear reactor, or nuclear fuel processing plant, or other installations wherein radioactive fluid systems are known to exist. The apparatus affords disposal of the captured particles in a manner which minimizes the exposure of operating personnel to radioactivity. The apparatus comprises a housing adapted to contain a removable filter cartridge assembly, a valve normally closing the lower end of the housing, an upwardly-open shipping cask located below the valve, and an elongated operating rod assembly projecting upwardly from the filter cartridge assembly and through the upper end of the housing to enable a workman to dismount the filter cartridge assembly from its housing and to lower the filter cartridge assembly through the valve and into the cask from a remote location above the housing. (U.S.)

  20. Production, deformation and mechanical investigation of magnetic alginate capsules

    Science.gov (United States)

    Zwar, Elena; Kemna, Andre; Richter, Lena; Degen, Patrick; Rehage, Heinz

    2018-02-01

    In this article we investigated the deformation of alginate capsules in magnetic fields. The sensitivity to magnetic forces was realised by encapsulating an oil in water emulsion, where the oil droplets contained dispersed magnetic nanoparticles. We solved calcium ions in the aqueous emulsion phase, which act as crosslinking compounds for forming thin layers of alginate membranes. This encapsulating technique allows the production of flexible capsules with an emulsion as the capsule core. It is important to mention that the magnetic nanoparticles were stable and dispersed throughout the complete process, which is an important difference to most magnetic alginate-based materials. In a series of experiments, we used spinning drop techniques, capsule squeezing experiments and interfacial shear rheology in order to determine the surface Young moduli, the surface Poisson ratios and the surface shear moduli of the magnetically sensitive alginate capsules. In additional experiments, we analysed the capsule deformation in magnetic fields. In spinning drop and capsule squeezing experiments, water droplets were pressed out of the capsules at elevated values of the mechanical load. This phenomenon might be used for the mechanically triggered release of water-soluble ingredients. After drying the emulsion-filled capsules, we produced capsules, which only contained a homogeneous oil phase with stable suspended magnetic nanoparticles (organic ferrofluid). In the dried state, the thin alginate membranes of these particles were rather rigid. These dehydrated capsules could be stored at ambient conditions for several months without changing their properties. After exposure to water, the alginate membranes rehydrated and became flexible and deformable again. During this swelling process, water diffused back in the capsule. This long-term stability and rehydration offers a great spectrum of different applications as sensors, soft actuators, artificial muscles or drug delivery systems.