WorldWideScience

Sample records for bwr applications final

  1. Application of tearing modulus stability concepts to nuclear piping. Final report. [PWR; BWR

    Energy Technology Data Exchange (ETDEWEB)

    Cotter, K.H.; Chang, H.Y.; Zahoor, A.

    1982-02-01

    The recently developed tearing modulus stability concept was successfully applied to several boiling water reactor (BWR) and pressurized water reactor (PWR) piping systems. Circumferentially oriented through-the-thickness cracks were postulated at numerous locations in each system. For each location, the simplified tearing stability methods developed in USNRC Report NUREG/CR-0838 were used to determine crack stability. The J-T diagram was used to present the results of the computations. The piping systems considered included Type 304 stainless steel as well as A106 carbon steel materials. These systems were analyzed using the piping analysis computer code MINK.

  2. BWR Refill-Reflood Program. Final report

    International Nuclear Information System (INIS)

    Myers, L.L.

    1983-09-01

    The BWR Refill-Reflood Program is part of the continuing Loss of Coolant Accident (LOCA) research in the United States which is jointly sponsored by the Nuclear Regulatory Commission, the Electric Power Research Institute, and the General Electric Company. The current program expanded the focus of this research to include full scale experimental evaluations of multidimensional and multichannel effects during system refill. The program has also made major contributions to the BWR version of the Transient Reactor Analysis Code (TRAC) which has been developed cooperatively with the Idaho National Engineering Laboratory (INEL) for application to BWR transients. A summary description of the complete program is provided including the principal findings and main conclusions of the program. The results of the program have shown that multidimensional and parallel channel effects have the potential to significantly improve the system response over that observed in single channel tests

  3. LBB application in Swedish BWR design

    Energy Technology Data Exchange (ETDEWEB)

    Kornfeldt, H.; Bjoerk, K.O.; Ekstroem, P. [ABB Atom, Vaesteras (Sweden)

    1997-04-01

    The protection against dynamic effects in connection with potential pipe breaks has been implemented in different ways in the development of BWR reactor designs. First-generation plant designs reflect code requirements in effect at that time which means that no piping restraint systems were designed and built into those plants. Modern designs have, in contrast, implemented full protection against damage in connection with postulated pipe breaks, as required in current codes and regulations. Moderns standards and current regulatory demands can be met for the older plants by backfitting pipe whip restraint hardware. This could lead to several practical difficulties as these installations were not anticipated in the original plant design and layout. Meeting the new demands by analysis would in this situation have great advantages. Application of leak-before-break criteria gives an alternative opportunity of meeting modem standards in reactor safety design. Analysis takes into account data specific to BWR primary system operation, actual pipe material properties, piping loads and leak detection capability. Special attention must be given to ensure that the data used reflects actual plant conditions.

  4. LBB application in Swedish BWR design

    International Nuclear Information System (INIS)

    Kornfeldt, H.; Bjoerk, K.O.; Ekstroem, P.

    1997-01-01

    The protection against dynamic effects in connection with potential pipe breaks has been implemented in different ways in the development of BWR reactor designs. First-generation plant designs reflect code requirements in effect at that time which means that no piping restraint systems were designed and built into those plants. Modern designs have, in contrast, implemented full protection against damage in connection with postulated pipe breaks, as required in current codes and regulations. Moderns standards and current regulatory demands can be met for the older plants by backfitting pipe whip restraint hardware. This could lead to several practical difficulties as these installations were not anticipated in the original plant design and layout. Meeting the new demands by analysis would in this situation have great advantages. Application of leak-before-break criteria gives an alternative opportunity of meeting modem standards in reactor safety design. Analysis takes into account data specific to BWR primary system operation, actual pipe material properties, piping loads and leak detection capability. Special attention must be given to ensure that the data used reflects actual plant conditions

  5. BWR containments license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Smith, S.; Gregor, F.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures, and components, in the license renewal technical Industry Reports (IR's). License renewal applicants may choose to reference these IR's in support of their plant-specific license renewal applications as an equivalent to the integrated plant assessment provisions of the license renewal rule (IOCFR54). The scope of the IR provides the technical basis for license renewal for U.S. Boiling Water Reactor (BWR) containments. The scope of the report includes containments constructed of reinforced or prestressed concrete with steel liners and freestanding stell containments. Those domestic BWR containments designated as Mark I, Mark II or Mark III are covered, but no containments are addressed before these designs. The report includes those items within the jurisdictional boundaries for metal and concrete containments defined by Section III of the ASME Boiler and Pressure Vessel Code, Division 1, Subsection NE (Class MC) and Division 2 (Class CC) and their supports, but excluding snubbers

  6. Application of gadolinia credit to cask transportation of BWR-STEP3 SFAs

    International Nuclear Information System (INIS)

    Kikuchi, Tsukasa; Mitsuhashi, Ishi; Ito, Dai-ichiro; Nakamura, Yu

    2003-01-01

    Instead of the fresh-fuel assumption, the application of gadolinia credit to cask transportation of BWR SFAs is studied. Its efficacy for BWR-STEP2 SFAs had already been estimated. This paper reports on the application of gadolinia credit to cask transportation of BWR-STEP3 SFAs. (author)

  7. Prony's method application for BWR instabilities characterization

    Energy Technology Data Exchange (ETDEWEB)

    Castillo, Rogelio, E-mail: rogelio.castillo@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico); Ramírez, J. Ramón, E-mail: ramon.ramirez@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico); Alonso, Gustavo, E-mail: gustavo.alonso@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico); Instituto Politecnico Nacional, Unidad Profesional Adolfo Lopez Mateos, Ed. 9, Lindavista, D.F. 07300 (Mexico); Ortiz-Villafuerte, Javier, E-mail: javier.ortiz@inin.gob.mx [Instituto Nacional de Investigaciones Nucleares, Carretera México-Toluca s/n, La Marquesa, Ocoyoacac, Estado de México 52750 (Mexico)

    2015-04-01

    Highlights: • Prony's method application for BWR instability events. • Several BWR instability benchmark are assessed using this method. • DR and frequency are obtained and a new parameter is proposed to eliminate false signals. • Adequate characterization of in-phase and out-of-phase events is obtained. • The Prony's method application is validated. - Abstract: Several methods have been developed for the analysis of reactor power signals during BWR power oscillations. Among them is the Prony's method, its application provides the DR and the frequency of oscillations. In this paper another characteristic of the method is proposed to determine the type of oscillations that can occur, in-phase or out-of-phase. Prony's method decomposes a given signal in all the frequencies that it contains, therefore the DR of the fundamental mode and the first harmonic are obtained. To determine the more dominant pole of the system a normalized amplitude W of the system is calculated, which depends on the amplitude and the damping coefficient. With this term, it can be analyzed which type of oscillations is present, if W of the fundamental mode frequency is the greater, the type of oscillations is in-phase, if W of the first harmonic frequency is the greater, the type of oscillations is out-of-phase. The method is applied to several stability benchmarks to assess its validity. Results show the applicability of the method as an alternative analysis method to determine the type of oscillations occurred.

  8. Prony's method application for BWR instabilities characterization

    International Nuclear Information System (INIS)

    Castillo, Rogelio; Ramírez, J. Ramón; Alonso, Gustavo; Ortiz-Villafuerte, Javier

    2015-01-01

    Highlights: • Prony's method application for BWR instability events. • Several BWR instability benchmark are assessed using this method. • DR and frequency are obtained and a new parameter is proposed to eliminate false signals. • Adequate characterization of in-phase and out-of-phase events is obtained. • The Prony's method application is validated. - Abstract: Several methods have been developed for the analysis of reactor power signals during BWR power oscillations. Among them is the Prony's method, its application provides the DR and the frequency of oscillations. In this paper another characteristic of the method is proposed to determine the type of oscillations that can occur, in-phase or out-of-phase. Prony's method decomposes a given signal in all the frequencies that it contains, therefore the DR of the fundamental mode and the first harmonic are obtained. To determine the more dominant pole of the system a normalized amplitude W of the system is calculated, which depends on the amplitude and the damping coefficient. With this term, it can be analyzed which type of oscillations is present, if W of the fundamental mode frequency is the greater, the type of oscillations is in-phase, if W of the first harmonic frequency is the greater, the type of oscillations is out-of-phase. The method is applied to several stability benchmarks to assess its validity. Results show the applicability of the method as an alternative analysis method to determine the type of oscillations occurred

  9. Safety Evaluation Report related to the final design approval of the GESSAR II BWR/6 Nuclear Island Design (Docket No. 50-447). Supplement No. 3

    International Nuclear Information System (INIS)

    1985-01-01

    Supplement 3 to the Safety Evaluation Report (SER) for the application filed by General Electric Company for the final design approval for the GE BWR/6 nuclear island design has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. This report supplements the GESSAR II SER (NUREG-0979), issued in April 1983, summarizing the results of the staff's safety review of the GESSAR II BWR/6 nuclear island design. Subject to favorable resolution of the items discussed in this supplement, the staff concludes that the GESSAR II design satisfactorily addresses the severe-accident concerns described in draft NUREG-1070

  10. Final results of the XR2-1 BWR metallic melt relocation experiment

    International Nuclear Information System (INIS)

    Gauntt, R.O.; Humphries, L.L.

    1997-08-01

    This report documents the final results of the XR2-1 boiling water reactor (BWR) metallic melt relocation experiment, conducted at Sandia National Laboratories for the U.S. Nuclear Regulatory Commission. The objective of this experiment was to investigate the material relocation processes and relocation pathways in a dry BWR core following a severe nuclear reactor accident such as an unrecovered station blackout accident. The imposed test conditions (initial thermal state and the melt generation rates) simulated the conditions for the postulated accident scenario and the prototypic design of the lower core test section (in composition and in geometry) ensured that thermal masses and physical flow barriers were modeled adequately. The experiment has shown that, under dry core conditions, the metallic core materials that melt and drain from the upper core regions can drain from the core region entirely without formation of robust coherent blockages in the lower core. Temporary blockages that suspended pools of molten metal later melted, allowing the metals to continue draining downward. The test facility and instrumentation are described in detail. The test progression and results are presented and compared to MERIS code analyses. 6 refs., 55 figs., 4 tabs

  11. An economic analysis of BWR control rod blade management strategies. Final report

    International Nuclear Information System (INIS)

    Welsh, J.

    1995-12-01

    Nuclear power plants have available a number of alternative courses of action that can contribute to the reduction of personnel exposure to radiation. Possible actions at boiling water reactor (BWR) plants include accelerating the replacement of high-cobalt control rod blades (CRB) or the blades' high-cobalt pins and rollers with low or non-cobalt substitutes. To help utilities understand the exposure reduction and the economic costs and benefits associated with management alternatives, such as accelerated replacement of blades, pins and rollers, EPRI has initiated a project called Cost/Benefit Software for Analyses of Radiation Control Measures (RP1935-32). Through this project EPRI will incorporate engineering-economic techniques into a series of analytical tools that will provide useful insights about alternative exposure reduction options. Prototype software has been developed in an Excel worksheet to analyze issues associated with BWR control rod blade management options. The CRB replacement problem framework and analysis methodology incorporated into the software tool will help plant managers consider explicitly key engineering and economic issues that are relevant to exposure reduction decisions. This tool generates results that can help plant managers make decisions that are fiscally wise by showing all the cost and benefit implications associated with a management action under consideration. This report describes the general analytical approach for evaluating exposure reduction alternatives. The methodology used to analyze blade and pin and roller replacement alternatives, and the results of a case study application of the methodology and the software prototype at Commonwealth Edison

  12. Physical model of nonlinear noise with application to BWR stability

    International Nuclear Information System (INIS)

    March-Leuba, J.; Perez, R.B.

    1983-01-01

    Within the framework of the present model it is shown that the BWR reactor cannot be unstable in the linear sense, but rather it executes limited power oscillations of a magnitude that depends on the operating conditions. The onset of these oscillations can be diagnosed by the decrease in stochasticity in the power traces and by the appearance of harmonics in the PSD

  13. Safety Evaluation Report related to the final design approval of the GESSAR II BWR/6 Nuclear Island design, Docket No. 50-447

    International Nuclear Information System (INIS)

    1983-04-01

    The Safety Evaluation Report for the application filed by General Electric Company for the Final Design Approval for the General Electric Standard Safety Analysis Report (GESSAR II FSAR) has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. This report summarizes the results of the staff's safety review of the GESSAR II BWR/6 Nuclear Island Design. Subject to favorable resolution of items discussed in the Safety Evaluation Report, the staff concludes that the facilities referencing GESSAR II, subject to approval of the balance-of-plant design, can conform with the provisions of the Act and the regulations of the Nuclear Regulatory Commission

  14. Validation and application of the system code ATHLET-CD for BWR severe accident analyses

    Energy Technology Data Exchange (ETDEWEB)

    Di Marcello, Valentino, E-mail: valentino.marcello@kit.edu; Imke, Uwe; Sanchez, Victor

    2016-10-15

    Highlights: • We present the application of the system code ATHLET-CD code for BWR safety analyses. • Validation of core in-vessel models is performed based on KIT CORA experiments. • A SB-LOCA scenario is simulated on a generic German BWR plant up to vessel failure. • Different core reflooding possibilities are investigated to mitigate the accident consequences. • ATHLET-CD modelling features reflect the current state of the art of severe accident codes. - Abstract: This paper is aimed at the validation and application of the system code ATHLET-CD for the simulation of severe accident phenomena in Boiling Water Reactors (BWR). The corresponding models for core degradation behaviour e.g., oxidation, melting and relocation of core structural components are validated against experimental data available from the CORA-16 and -17 bundle tests. Model weaknesses are discussed along with needs for further code improvements. With the validated ATHLET-CD code, calculations are performed to assess the code capabilities for the prediction of in-vessel late phase core behaviour and reflooding of damaged fuel rods. For this purpose, a small break LOCA scenario for a generic German BWR with postulated multiple failures of the safety systems was selected. In the analysis, accident management measures represented by cold water injection into the damaged reactor core are addressed to investigate the efficacy in avoiding or delaying the failure of the reactor pressure vessel. Results show that ATHLET-CD is applicable to the description of BWR plant behaviour with reliable physical models and numerical methods adopted for the description of key in-vessel phenomena.

  15. Application of eddy current inspection to the Inconel weld of BWR internals

    International Nuclear Information System (INIS)

    Machida, Eiji; Yusa, Noritaka

    2004-01-01

    In order to definite the basic specifications of application of ECT (Eddy Current Test) to Inconel weld of BWR internals, the inspection and numerical analysis were carried out. The characteristics of the existing ECT probe were studied by making sample as same as CRD stud tube, measuring the relative permeability and electric conductivity of Inconel and alloy and evaluating ECT probe. On the basis of the results obtained, the basic specifications were determined and a new eddy current probe for inspection was designed and produced. The new ECT probe was able to detect small notch in Inconel weld, to classify the defects by eddy current inspection signal and sizing the length and depth. It is concluded that the new ECT probe is able to apply the Inconel weld of BWR internals. (S.Y.)

  16. Application of process computers and colour CRT displays in the plant control room of a BWR

    International Nuclear Information System (INIS)

    Itoh, M.; Hayakawa, H.; Kawahara, H.; Neda, T.; Wakabayashi, Y.

    1983-01-01

    The recent application of a CRT display system in an 1100-MW(e) BWR plant control room and the design features of a new control room whose installation is planned for the next generation are discussed. As reactor unit capacity and the need for plant safety and reliability continue to increase, instrumentation and control equipment is growing in number and complexity. In consequence, control and supervision of plant operations require improvement. Thus, because of recent progress in the field of process computers and display equipment (colour CRTs), efficient improvements of the control room are under way in the Japanese BWR plant. In the recently constructed BWR plant (1100 MW(e)), five CRTs on the bench board and two process computers were additionally installed in the control room during the construction stage to improve plant control and supervisory functions by implementing the lessons learned from the Three Mile Island incident. The major functions of the new computers and display systems are to show integrated graphic displays of the plant status, to monitor the standby condition of the safety system, to show the condition of the integrated alarm system, etc. In practice, in the actual plant, this newly installed system performs well. On the basis of the experience gained in these activities, a new computerized control and monitoring system is now being designed for subsequent domestic BWR plants. This advanced system will incorporate not only the functions already mentioned, but also a surveillance guide system and plant automation. For future plants, a diagnostic system and an instructional system that can analyse a disturbance and give operational guidance to the plant operator are being developed in a government-sponsored programme. (author)

  17. CCF analysis of high redundancy systems safety/relief valve data analysis and reference BWR application

    International Nuclear Information System (INIS)

    Mankamo, T.; Bjoere, S.; Olsson, Lena

    1992-12-01

    Dependent failure analysis and modeling were developed for high redundancy systems. The study included a comprehensive data analysis of safety and relief valves at the Finnish and Swedish BWR plants, resulting in improved understanding of Common Cause Failure mechanisms in these components. The reference application on the Forsmark 1/2 reactor relief system, constituting of twelve safety/relief lines and two regulating relief lines, covered different safety criteria cases of reactor depressurization and overpressure protection function, and failure to re close sequences. For the quantification of dependencies, the Alpha Factor Model, the Binomial Probability Model and the Common Load Model were compared for applicability in high redundancy systems

  18. Thermochemistry in BWR. An overview of applications of program codes and databases

    International Nuclear Information System (INIS)

    Hermansson, H-P.; Becker, R.

    2010-01-01

    The Swedish work on thermodynamics of metal-water systems relevant to BWR conditions has been ongoing since the 70ies, and at present time a compilation and adaptation of codes and thermodynamic databases are in progress. In the previous work, basic thermodynamic data were compiled for parts of the system Fe-Cr-Ni-Co-Zn-S-H 2 O at 25-300 °C. Since some thermodynamic information necessary for temperature extrapolations of data up to 300 °C was not published in the earlier works, these data have now been partially recalculated. This applies especially to the parameters of the HKF-model, which are used to extrapolate the thermodynamic data for ionic and neutral aqua species from 25 °C to BWR temperatures. Using the completed data, e.g. the change in standard Gibbs energy (ΔG 0 ) and the equilibrium constant (log K) can be calculated for further applications at BWR/LWR conditions. In addition a computer program is currently being developed at Studsvik for the calculation of equilibrium conductivity in high temperature water. The program is intended for PWR applications, but can also be applied to BWR environment. Data as described above will be added to the database of this program. It will be relatively easy to further develop the program e.g. to calculate Pourbaix diagrams, and these graphs could then be calculated at any temperature. This means that there will be no limitation to the temperatures and total concentrations (usually 10 -6 to 10 -8 mol/kg) as reported in earlier work. It is also easy to add a function generating ΔG 0 and log K values at selected temperatures. One of the fundamentals for this work was also to overview and collect publicly available thermodynamic program codes and databases of relevance for BWR conditions found in open sources. The focus has been on finding already done compilations and reviews, and some 40 codes and 15 databases were found. Codes and data-bases are often integrated and such a package is often developed for

  19. Theory and control calculations. Application to BWR and PWR

    International Nuclear Information System (INIS)

    Velarde, G.; Guerra, J.

    1972-01-01

    A theoretical method to extend the applicability of P 1 approximation to strong absorbers is given. Tables of effective diffusion parameters for slab and cylindrical geometry as well as a summary of expressions for obtaining the extrapolation length in cases of interest, are included. (Author) 21 refs

  20. Computational fluid dynamics modeling of two-phase flow in a BWR fuel assembly. Final CRADA Report

    International Nuclear Information System (INIS)

    Tentner, A.

    2009-01-01

    A direct numerical simulation capability for two-phase flows with heat transfer in complex geometries can considerably reduce the hardware development cycle, facilitate the optimization and reduce the costs of testing of various industrial facilities, such as nuclear power plants, steam generators, steam condensers, liquid cooling systems, heat exchangers, distillers, and boilers. Specifically, the phenomena occurring in a two-phase coolant flow in a BWR (Boiling Water Reactor) fuel assembly include coolant phase changes and multiple flow regimes which directly influence the coolant interaction with fuel assembly and, ultimately, the reactor performance. Traditionally, the best analysis tools for this purpose of two-phase flow phenomena inside the BWR fuel assembly have been the sub-channel codes. However, the resolution of these codes is too coarse for analyzing the detailed intra-assembly flow patterns, such as flow around a spacer element. Advanced CFD (Computational Fluid Dynamics) codes provide a potential for detailed 3D simulations of coolant flow inside a fuel assembly, including flow around a spacer element using more fundamental physical models of flow regimes and phase interactions than sub-channel codes. Such models can extend the code applicability to a wider range of situations, which is highly important for increasing the efficiency and to prevent accidents.

  1. Alternative Zr alloys with irradiation resistant precipitates for high burnup BWR application

    International Nuclear Information System (INIS)

    Garzarolli, F.; Ruhmann, H.; Van Swan, L.

    2002-01-01

    In the core of BWRs, the second-phase particles (SPP) of Zircaloy-2 and Zircaloy-4, the Zr(FeCr) 2 and the Zr 2 (FeNi) phase, release Fe and dissolve. The degree of dissolution depends on initial size and fluence. These SPP, however, are important for the corrosion behavior of Zircaloy. Zircaloy shows an increase of corrosion at a certain burnup, depending on the initial SPP size and fast neutron fluence. Only Zr alloys with irradiation resistant SPP avoid this type of increased corrosion completely. Two types of irradiation resistant materials were considered. One is a Zr-Sn-Fe alloy containing the Zr 3 Fe phase, which is irradiation resistant under BWR conditions. The other material is a Zr-Sn-Nb alloy containing the irradiation resistant β-Nb phase. In-BWR tests have shown that a Sn content of >0.8% is mandatory to minimize the nodular corrosion. Two prototypes of irradiation resistant alloys, Zr1.3Sn0.25-0.3 Fe and Zr1Sn2-3Nb, were irradiated in a BWR for 1372 days to a fast fluence of 9 x 10 21 n/cm 2 (E > 1 MeV). These irradiation tests showed that Zr1.3Sn0.25-0.3 Fe has a little lower resistance against nodular corrosion than optimized LTP (Low Temperature Process) Zircaloy-2/4 and revealed that Zr1Sn2-3Nb is superior to LTP Zircaloy-2/4 with respect to nodular and shadow corrosion resistance. The BWR corrosion resistance of Zr1Sn2-3Nb depends on heat treatment. The lowest corrosion was observed with material fabricated completely in the α-range, but also material manufactured in the lower (α+β)-range exhibits low corrosion. Material fabricated in the upper (α+β)-range showed a somewhat higher corrosion, a corrosion behavior similar to LTP Zircaloy-2/4. As far as final annealing is concerned, a long time annealing at 540 deg C is superior to a standard recrystallization treatment (e.g., at 580 deg C), which still leads to a corrosion behavior that is better than stress relieved Zr1Sn2-3Nb. Zr1Sn2-3Nb is resistant to shadow corrosion, when fabricated

  2. Technical description and evaluation of BWR hybrid power shape monitoring system. Final report

    International Nuclear Information System (INIS)

    Frogner, B.; Ipaktchi, A.; Yang, C.; Grow, R.; Ho, C.; Kiguchi, T.

    1982-03-01

    This report discusses the method for monitoring BWR cores that has been implemented in the Power Shape Monitoring System (PSMS). The approach has been benchmarked to TIP data from three plants and five fuel cycles and the accuracy of the calculations has been evaluated by using gamma scan data from two plants. A coupled neutronics/thermal-hydraulic nodal code (NODE-B/THERM-B) is used in the PSMS. It has been demonstrated that adaptation of this code to partially fit the TIP readings followed by a statistical characterization of the remaining errors results in better accuracy and improved sensitivity for anomaly detection compared to an approach that is entirely dependent upon the detector readings. The computed power distribution has a one-sigma uncertainty of 6% for the nodal power and 4% for the bundle power. This is significantly better than the plant process computers that actually were used for monitoring those two plants where comparisons were made

  3. Application of EASY5 and MMS modules to BWR controller design

    International Nuclear Information System (INIS)

    Carmichael, L.A.; Rayes, L.; Yasutake, T.

    1987-01-01

    The application of EPRI's MMS Library and BCS' EASY5 simulation language to the design of a digital feedwater control system for the Monticello Boiling Water Nuclear Power Plant is discussed. In order to first design and then verify the digital feedwater controller algorithms, a digital simulation model of the Monticello plant was constructed using a combination of custom designed modules, existing MMS two-phase library modules, and standard modules available in the EASY5 library. Details of the process models, namely the BWR nuclear steam supply system, the steamline piping, and the feedwater piping are described in a companion paper. Details of the models for the existing BWR turbine pressure inlet pressure control and recirculation flow control system are described. These models are required to be operational during the transient analysis portion of the feedwater controller design verification, since they interact strongly with the reactor steam flow and water level. The design of the digital feedwater flow control loop is described. Its design is of particular interest because it requires consideration of control loop interaction and is, therefore, a simple example of multivariable non-interacting control design

  4. Experimental study of advanced continuous acoustic emission monitoring of BWR components. Final report

    International Nuclear Information System (INIS)

    McElroy, J.W.; Hartman, W.F.

    1980-09-01

    The program consisted of installing, maintaining, and monitoring AE sensors located on primary piping, nozzles, and valves in the BWR system. Analysis of the AE data was correlated to the results of supplementary nondestructive testing techniques used during the in-service inspection, performed at refueling outages. Purpose of the program was to develop the on-line surveillance acoustic emission technique in order to identify areas of possible structural degradation. Result of reducing inspection time was to reduce accumulated radiation exposure to inspecting personnel and to reduce the amount of critical plant outage time by identifying the critical inspection areas during operation. The program demonstrated the capability of acoustic emission instrumentation to endure the nuclear reactor environment. The acoustic emission sensors withstood 12 months of reactor operation at temperatures of 400 0 F and greater in high radiation fields. The preamplifiers, also mounted in the reactor environment, operated for the 12-month period in 100% humidity, 250 0 F conditions. The remaining cable and AE instrumentation were operated in controlled environments

  5. BWR SFAT, gross-defect verification of spent BWR fuel. Final report on Task FIN A563 on the Finnish Support Programme to IAEA Safeguards including BWR SFAT User Manual

    International Nuclear Information System (INIS)

    Tarvainen, M.; Paakkunainen, M.; Tiitta, A.; Sarparanta, K.

    1994-04-01

    A measurement instrument called Spent Fuel Attribute Tester, SFAT, has been designed, fabricated and taken into use by the IAEA in gross defect verification of spent BWR fuel assemblies. The equipment consists of an underwater measurement head connected with cables to a control unit on the bridge of the fuel handling machine as well as to a PMCA for measurement of the gamma spectra. The BWR SFAT is optimized for the AFR interim storage, TVO KPA-STORE, of the TVO Power Company in Olkiluoto, Finland. It has a shape and it is moved like a fuel assembly using the fuel handling machine. No fuel movements are needed. Spent fuel specific radiation from the fission product 137 Cs at the gamma-ray energy of 662 keV is detected above the assemblies in the storage rack using a NaI(Tl) detector. In the design and in licensing the requirements of the IAEA, operator and the safety authority have been taken into account. The BWR SFAT allows modifications for other LWR fuel types with minor changes. The work has been carried out under the task FIN A 563 of the Finnish Support Programme to IAEA Safeguards. (orig.) (9 refs., 22 figs.)

  6. Compact modular BWR (CM-BWR)

    International Nuclear Information System (INIS)

    Fennern, Larry; Boardman, Charles; Carroll, Douglas G.; Hida, Takahiko

    2003-01-01

    A preliminary assessment has shown that a small 350 MWe BWR reactor can be placed within a close fitting steel containment vessel that is 7.1 meters inside diameter. This allows the technology and manufacturing capability currently used to fabricate large ABWR reactor vessels to be used to provide a factory fabricated containment vessel for a 350 MWe BWR. When a close fitted steel containment is combined with a passive closed loop isolation condenser system and a natural circulating reactor system that contains a large water inventory, primary system leaks cannot uncover the core. This eliminates many of the safety systems needed in response to a LOCA that are common to large, conventional plant designs including. Emergency Core Flooding, Automatic Depressurization System, Active Residual Heat Removal, Safety Related Auxiliary Cooling, Safety Related Diesel Generators, Hydrogen Re-Combiners, Ex-vessel Core Retention and Cooling. By fabricating the containment in a factory and eliminating most of the conventional safety systems, the construction schedule is shortened and the capital cost reduced to levels that would not otherwise be possible for a relatively small modular BWR. This makes the CM-BWR a candidate for applications where smaller incremental power additions are desired relative to a large ALWR or where the local infrastructure is not able to accommodate a conventional ALWR plant rated at 1350 MWe or more. This paper presents a preliminary design description of a Compact Modular BWR (CM-BWR) whose design features dramatically reduce the size and cost of the reactor building and associated safety systems. (author)

  7. Water chemistry and radiation buildup at the Commonwealth Edison Company LaSalle-1 BWR. Final report

    International Nuclear Information System (INIS)

    Earls, C.E.; Blok, J.

    1986-09-01

    This report presents the results of a comprehensive study of the water quality and radiation buildup at the LaSalle County Unit 2 boiling warer reactor (BWR). The purpose of the study was to determine the effect of corrosion product inputs from the forward pumped heater drains on overall water quality. Since the drains are pumped into the feedwater line without filtration or demineralization, corrosion products in these streams will directly add to the impurity levels of the final feedwater. At LaSalle, the forward pumped heater drains contributed less to the feedwater impurities, on average, than the effluent of the condensate demineralizer. The feedwater quality at LaSalle was generally in the ''acceptable'' range. Nevertheless, significant water chemistry improvements, especially in reducing the corrosion product spikes associated with power or flow transients, is highly desirable for this plant. Such improvements should begin with a more consistent quality of demineralizer operation. Quantitative gamma scans of the primary system piping at LaSalle 2 were carried out in the course of the water chemistry study. Although the cumulative operational exposure of the plant was relatively limited at the time this study was carried out, the radiation buildup rate did appear to be rapid (in fact, among the most rapid) compared to other similar BWRs

  8. Application of TRAC-BD1/MOD1 to a BWR/4 feedwater control failure ATWS

    International Nuclear Information System (INIS)

    Rouhani, S.Z.; Giles, M.M.; Mohr, C.M. Jr.; Weaver, W.L. III.

    1984-01-01

    This paper begins with a short description of the Transient Reactor Analysis Code for Boiling Water Reactors (TRAC-BWR), briefly mentioning some of its main features such as specific BWR models and input structure. Next, an input model of a BWR/4 is described, and, the assumptions used in performing an analysis of the loss of a feedwater controller without scram are listed. The important features of the calculated trends in flows, pressure, reactivity, and power are shown graphically and commented in the text. A comparison of some of the main predicted trends with the calculated results from a similar study by General Electric is also presented

  9. An application of the process computer and CRT display system in BWR nuclear power station

    International Nuclear Information System (INIS)

    Goto, Seiichiro; Aoki, Retsu; Kawahara, Haruo; Sato, Takahisa

    1975-01-01

    A color CRT display system was combined with a process computer in some BWR nuclear power plants in Japan. Although the present control system uses the CRT display system only as an output device of the process computer, it has various advantages over conventional control panel as an efficient plant-operator interface. Various graphic displays are classified into four categories. The first is operational guide which includes the display of control rod worth minimizer and that of rod block monitor. The second is the display of the results of core performance calculation which include axial and radial distributions of power output, exit quality, channel flow rate, CHFR (critical heat flux ratio), FLPD (fraction of linear power density), etc. The third is the display of process variables and corresponding computational values. The readings of LPRM, control rod position and the process data concerning turbines and feed water system are included in this category. The fourth category includes the differential axial power distribution between base power distribution (obtained from TIP) and the reading of each LPRM detector, and the display of various input parameters being used by the process computer. Many photographs are presented to show examples of those applications. (Aoki, K.)

  10. Experimental study of advanced continuous acoustic-emission monitoring of BWR components. Final report

    International Nuclear Information System (INIS)

    McElroy, J.W.

    1982-01-01

    This report presents the results of a four year research program on the utilization of acoustic emission techniques on light water reactor component applications. Two techniques of the acoustic emission technology were applied to specific problems occurring within the light water reactor system. Crack detection AE monitoring was applied to thermal cycle fatigue cracking problems and stress corrosion cracking problems. Leak detection AE monitoring was applied to valve leakage in the main steam safety relief valves and incontainment packing gland valves. The report provides AE data showing how AE crack detection can be used as an on-line diagnostic monitoring tool. By having an active monitor on light water reactor components, the inservice inspection of the components is being performed during operation rather than refueling periods, thereby reducing critical path time during outages. The resultant benefit is increased plant availability and a reduction in accumulated radiation exposure

  11. Development of quick-response area-averaged void fraction meter. Application to BWR condition

    Energy Technology Data Exchange (ETDEWEB)

    Iguchi, Tadashi; Watanabe, Hironori; Kimura, Mamoru; Anoda, Yoshinari [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2001-05-01

    Authors have been developed a practical conductance-type void fraction meter to measure instantaneously area-averaged void fraction in rod bundle. The principle of the meter is based on the fact that the electrical conductance changes with the change of void fraction in gas-liquid two-phase flow. According to air/water two-phase flow experiment, the void fraction was approximated by {alpha}=1-I/I{sub 0}, where {alpha} and I are void fraction and current (I{sub 0} is current at {alpha}=0). Authors investigated the performance of the void fraction meter under high temperature/high pressure conditions (BWR condition; 290degC, 7MPa). The results indicated that the void fraction was approximated by {alpha}=1-I/I{sub 0} even under high temperature/high pressure condition of stem/water flow. However, it is necessary to take account of temperature dependency of water specific conductance. Therefore, authors derived a correction equation for temperature dependency. Further, for applying the void fraction meter to a large-scale facility, it was found to be necessary to reduce the capacitance of the circuit. Then, authors developed the method to reduce the capacitance effect. Finally, authors succeeded to measure the void fraction in 2 x 2 bundle flow path at the range of 0% - 70% in the error of 10% under high temperature/high pressure and mass flux of less than 133 kg/m{sup 2}s. Developed void fraction meter is theoretically not affected by flow rate. Therefore, it can be applied to the condition of oscillating flow. (author)

  12. On the fast estimation of transit times application to BWR simulated data

    International Nuclear Information System (INIS)

    Antonopoulos-Domis, M.; Marseguerra, M.; Padovani, E.

    1996-01-01

    Real time estimators of transit times are proposed. BWR noise is simulated including a global component due to rod vibration. The time obtained form the simulation is used to investigate the robustness and noise immunity of the estimators. It is found that, in presence of a coincident (global) signal, the cross-correlation function is the worst estimator. (authors)

  13. Parametric study of the potential for BWR ECCS strainer blockage due to LOCA generated debris. Final report

    International Nuclear Information System (INIS)

    Zigler, G.; Brideau, J.; Rao, D.V.; Shaffer, C.; Souto, F.; Thomas, W.

    1995-10-01

    This report documents a plant-specific study for a BWR/4 with a Mark I containment that evaluated the potential for LOCA generated debris and the probability of losing long term recirculation capability due ECCS pump suction strainer blockage. The major elements of this study were: (1) acquisition of detailed piping layouts and installed insulation details for a reference BWR; (2) analysis of plant specific piping weld failure probabilities to estimate the LOCA frequency; (3) development of an insulation and other debris generation and drywell transport models for the reference BWR; (4) modeling of debris transport in the suppression pool; (5) development of strainer blockage head loss models for estimating loss of NPSH margin; (6) estimation of core damage frequency attributable to loss of ECCS recirculation capability following a LOCA. Elements 2 through 5 were combined into a computer code, BLOCKAGE 2.3. A point estimate of overall DEGB pipe break frequency (per Rx-year) of 1.59E-04 was calculated for the reference plant, with a corresponding overall ECCS loss of NPSH frequency (per Rx-year) of 1.58E-04. The calculated point estimate of core damage frequency (per Rx-year) due to blockage related accident sequences for the reference BWR ranged from 4.2E-06 to 2.5E-05. The results of this study show that unacceptable strainer blockage and loss of NPSH margin can occur within the first few minutes after ECCS pumps achieve maximum flows when the ECCS strainers are exposed to LOCA generated fibrous debris in the presence of particulates (sludge, paint chips, concrete dust). Generic or unconditional extrapolation of these reference plant calculated results should not be undertaken

  14. Application of Continuous and Structural ARMA modeling for noise analysis of a BWR coupled core and plant instability event

    International Nuclear Information System (INIS)

    Demeshko, M.; Dokhane, A.; Washio, T.; Ferroukhi, H.; Kawahara, Y.; Aguirre, C.

    2015-01-01

    Highlights: • We demonstrate the first application of a novel CSARMA method. • We analyze the instability occurred in a Swiss BWR plant during power ascension. • Benchmarked the results against STP analysis. • The CSARMA results are consistent with the background physics and the STP results. • The instability was caused by disturbances in the pressure control system. - Abstract: This paper presents a first application of a novel Continuous and Structural Autoregressive Moving Average (CSARMA) modeling approach to BWR noise analysis. The CSARMA approach derives a unique representation of the system dynamics by more robust and reliable canonical models as basis for signal analysis in general and for reactor diagnostics in particular. In this paper, a stability event that occurred in a Swiss BWR plant during power ascension phase is analyzed as well as the time periods that preceded and followed the event. Focusing only on qualitative trends at this stage, the obtained results clearly indicate a different dynamical state during the unstable event compared to the two other stable periods. Also, they could be interpreted as pointing out a disturbance in the pressure control system as primary cause for the event. To benchmark these findings, the frequency-domain based signal transmission-path (STP) method is also applied. And with the STP method, we obtained similar relationships as mentioned above. This consistency between both methods can be considered as being a confirmation that the event was caused by a pressure control system disturbance and not induced by the core. Also, it is worth noting that the STP analysis failed to catch the relations among the processes during the stable periods, that were clearly indicated by the CSARMA method, since the last uses more precise models as basis

  15. Development of advanced BWR

    International Nuclear Information System (INIS)

    Toyota, Masatoshi

    1982-01-01

    The Japanese technology and domestic production of BWR type nuclear power plants have been established through the experiences in the construction and operation of BWRs in addition to the technical agreement with the General Electric Co. In early days, the plants experienced some trouble such as stress corrosion cracking and some inconvenience in the operation and maintenance. The government, electric power companies and BWR manufacturers have endeavored to standardize and improve the design of LWRs for the purpose of improving the safety, reliability and the rate of operation and reducing the radiation exposure dose of plant workers. The first and second stages of the standardization and improvement of LWRs have been completed. Five manufacturers of BWRs in the world have continued the conceptual design of a new version of BWR power plants. It was concluded that this is the most desirable version of BWR nuclear power stations, but the technical and economic evaluation must be made before the commercial application. Six electric power companies and three manufacturers of BWRs in Japan set up the organization to develop the technology in cooperation. The internal pump system, the new control rod drive mechanism and others are the main features. (Kako, I.)

  16. TRAC-BWR development

    International Nuclear Information System (INIS)

    Weaver, W.L.; Rouhani, S.Z.

    1983-01-01

    The TRAC-BD1/MOD1 code containing many new or improved models has been assembled and is undergoing developmental assessment and testing and should be available shortly. The preparation of the manual for this code version is underway and should be available to the USNRC and their designated contractors by April of 1984. Finally work is currently underway on a fast running version of TRAC-BWR which will contain a one-dimensional neutron kinetics model

  17. Technical report on material selection and processing guidelines for BWR [boiling water reactor] coolant pressure boundary piping: Final report

    International Nuclear Information System (INIS)

    Hazelton, W.S.; Koo, W.H.

    1988-01-01

    This report provides the technical bases for the NRC staff's revised recommended methods to control the intergranular stress corrosion cracking susceptibility of BWR piping. For piping that does not fully comply with the material selection, testing, and processing guideline combinations of this document, varying degrees of augmented inservice inspection are recommended. This revision also includes guidance and NRC staff recommendations (not requirements) regarding crack evaluation and weld overlay repair methods for long-term operation or for continuing interim operation of plants until a more permanent solution is implemented

  18. Technical Specification action statements requiring shutdown. A risk perspective with application to the RHR/SSW systems of a BWR

    Energy Technology Data Exchange (ETDEWEB)

    Mankamo, T. [Avaplan Oy, Espoo (Finland); Kim, I.S.; Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States)

    1993-11-01

    When safety systems fail during power operation, the limiting conditions for operation (LCOs) and associated action statements of technical specifications typically require that the plant be shut down within the limits of allowed outage time (AOT). However, when a system needed to remove decay heat, such as the residual heat removal (RHR) system, is inoperable or degraded, shutting down the plant may not necessarily be preferable, from a risk perspective, to continuing power operation over a usual repair time, giving priority to the repairs. The risk impact of the basic operational alternatives, i.e., continued operation or shutdown, was evaluated for failures in the RHR and standby service water (SSW) systems of a boiling-water reactor (BWR) nuclear power plant. A complete or partial failure of the SSW system fails or degrades not only the RHR system but other front-line safety systems supported by the SSW system. This report presents the methodology to evaluate the risk impact of LCOs and associated AOT; the results of risk evaluation from its application to the RHR and SSW systems of a BWR; the findings from the risk-sensitivity analyses to identify alternative operational policies; and the major insights and recommendations to improve the technical specifications action statements.

  19. Application of noise analysis to stability determination of a natural circulation cooled BWR

    Energy Technology Data Exchange (ETDEWEB)

    Hagen, T.H.J.J. van der; Dam, H. van; Hoogenboom, J.E.; Nissen, W.H.M.; Oosterkamp, W.J.

    1988-01-01

    Experiments were performed on the Dodewaard natural circulation cooled BWR at different conditions. The absolute stability was determined by measuring system responses to control rod and steam flow valve steps. Changes in core stability were studied using the signal of an average power range monitor (APRM) in time domain (auto-correlation function and impulse response) and in frequency domain (power spectral density and peaking factor), the outlet void fraction and variations of the incore coolant velocity. It is shown that the reactor is very stable and that cooling by natural circulation improves load following. Stability monitoring can be performed by all mentioned methods but using APRM signals in frequency domain is preferred.

  20. Exxon Nuclear WREM-based NJP-BWR ECCS evaluation model and example application to the Oyster Creek Plant

    International Nuclear Information System (INIS)

    Krysinski, T.L.; Bjornard, T.A.; Steves, L.H.

    1975-01-01

    A proposed integrated ECCS model for non-jet pump boiling water reactors is presented, using the RELAP4-EM/BLOWDOWN and RELAP4-EM/SMALL BREAK portions of the Exxon Nuclear WREM-based Generic PWR Evaluation Model coupled with the ENC NJP-BWR Fuel Heatup Model. The results of the application of the proposed model to Oyster Creek are summarized. The results of the break size sensitivity study using the proposed model for the Oyster Creek Plant are presented. The application of the above results yielded the MAPLHGR curves. Included are a description of the proposed non-jet pump boiling water reaction evaluation model, justification of its conformance with TOCFR50, Appendix K, the adopted Oyster Creek plant model, and results of the analysis and sensitivity studies. (auth)

  1. Application of passive auto catalytic recombiner (PAR) for BWR plants in Japan

    International Nuclear Information System (INIS)

    Kobayashi, K.; Murano, K.; Yamanari, S.; Yamamoto, Y.

    2001-01-01

    The passive auto-catalytic recombiner (PAR), which can recombine flammable gases such as hydrogen and oxygen with each other to avoid an explosion in case of a loss-of-coolant accident (LOCA), installed in the primary containment vessel does not require a power supply or dynamic equipment, while the existing flammability gas control system (FCS) of most BWRs as an outer loop of the primary containment vessel needs them to make flammable gases circulate through blowers and heaters in the system. PAR offers a number of advantages over existing FCS, such as high reliability, low cost due to much smaller amount of materials needed, good maintainability, good operability in case of a LOCA, and smaller space for installation. An experimental study has been carried out for the purpose of solving the problems of applying PAR to Japanese BWR plants instead of existing FCS, in which we grasped the basic characteristics of PAR. (author)

  2. Applicability study on a ceramic filter with hot-test conducted in a BWR plant

    International Nuclear Information System (INIS)

    Yamada, K.; Shirai, T.; Wada, M.; Nakamizo, H.

    1991-01-01

    Radioactive crud removal and filtration performance recovery by backwashing were examined with a BWR plant pool water using a ceramic filter element, 0.1 micron in nominal pore size and 0.2m 2 in filtration area. Totally 1114 hours filter operation were accumulated. Ten backwashings were accomplished during the test period. The following results were obtained. (1) Radioactive crud concentration in the filter effluent remained below 10 5 Bq/m 3 . (2) Both pressure loss through the filter and dose rate at the filter vessel surface were recovered to the initial level by each backwashing. The surface dose rate after backwashing was approximately 0.01mSv/h. According to these test results, it is confirmed that the ceramic filter is appropriate for the treatment of highly crud concentrated radioactive liquid, which is generated in nuclear facilities, such as spent fuel reprocessing plants. (author)

  3. Modeling of BWR core meltdown accidents - for application in the MELRPI. MOD2 computer code

    Energy Technology Data Exchange (ETDEWEB)

    Koh, B R; Kim, S H; Taleyarkhan, R P; Podowski, M Z; Lahey, Jr, R T

    1985-04-01

    This report summarizes improvements and modifications made in the MELRPI computer code. A major difference between this new, updated version of the code, called MELRPI.MOD2, and the one reported previously, concerns the inclusion of a model for the BWR emergency core cooling systems (ECCS). This model and its computer implementation, the ECCRPI subroutine, account for various emergency injection modes, for both intact and rubblized geometries. Other changes to MELRPI deal with an improved model for canister wall oxidation, rubble bed modeling, and numerical integration of system equations. A complete documentation of the entire MELRPI.MOD2 code is also given, including an input guide, list of subroutines, sample input/output and program listing.

  4. High Fidelity BWR Fuel Simulations

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Su Jong [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-08-01

    This report describes the Consortium for Advanced Simulation of Light Water Reactors (CASL) work conducted for completion of the Thermal Hydraulics Methods (THM) Level 3 milestone THM.CFD.P13.03: High Fidelity BWR Fuel Simulation. High fidelity computational fluid dynamics (CFD) simulation for Boiling Water Reactor (BWR) was conducted to investigate the applicability and robustness performance of BWR closures. As a preliminary study, a CFD model with simplified Ferrule spacer grid geometry of NUPEC BWR Full-size Fine-mesh Bundle Test (BFBT) benchmark has been implemented. Performance of multiphase segregated solver with baseline boiling closures has been evaluated. Although the mean values of void fraction and exit quality of CFD result for BFBT case 4101-61 agreed with experimental data, the local void distribution was not predicted accurately. The mesh quality was one of the critical factors to obtain converged result. The stability and robustness of the simulation was mainly affected by the mesh quality, combination of BWR closure models. In addition, the CFD modeling of fully-detailed spacer grid geometry with mixing vane is necessary for improving the accuracy of CFD simulation.

  5. Application of a simplified seismic risk methodology to the La Salle County Station Unit 2 BWR

    International Nuclear Information System (INIS)

    Lappa, D.A.; Wells, J.E.

    1986-01-01

    It is important to bear in mind that no risk assessment of any U.S. nuclear power plant can be interpreted to be generally representative of more than a handful of other U.S. plants. Variations in factors ranging from plant age and operating experience to NRC licensing requirements and design guidelines have led to a wide diversity of power plants in the United States. Except for a few combinations of plants of comparable design and vintage, the extension of plant-specific results to other nuclear power plants should only be done with considerable trepidation. This situation is worsened for a seismic PRA because of the variability in the seismic hazard from site to site. In the case of this study, it would be a mistake to infer that all BWRs are sufficiently resistant to earthquakes because of the generally low seismic failure probabilities at La Salle. Unless those BWRs had similar site characteristics and were of a similar design and vintage as La Salle, no immediate extension of this study's results would be appropriate. With these thoughts in mind, we turn our attention to one of the questions which the La Salle seismic PRA is supposed to address, namely, the comparable seismic vulnerability of BWRs and PWRs. The La Salle study has provided us with some insight to the seismic risk at a particular BWR. This information may or may not be useful to understanding the seismic vulnerability of other BWRs

  6. Applicability of best-estimate analysis TRACE in terms of natural circulation BWR stability

    International Nuclear Information System (INIS)

    Furuya, Masahiro; Ueda, Nobuyuki; Nishi, Yoshihisa

    2011-01-01

    As a part of the international CAMP-Program of the US Nuclear Regulatory Commission (USNRC), the best-estimate code TRACE is validated with the stability database of SIRIUS-N Facility at high pressure. The TRACE code analyzed is version 5 patch level 2. The SIRIUS-N facility simulates thermal-hydraulics of the economic simplified BWR (ESBWR). The oscillation period correlates well with bubble transit time through the chimney region regardless of the system pressure, inlet subcooling and heat flux. Numerical results exhibits type-I density wave oscillation characteristics, since core inlet restriction shifts stability boundary toward the higher inlet subcooling, and chimney exit restriction enlarges instability region and oscillation amplitude. Stability maps in reference to the subcooling and heat flux obtained from the TRACE code agrees with those of the experimental data at 1 MPa. As the pressure increases from 2 MPa to 7.2 MPa, numerical results become much stable than the experimental results. This is because that two-phase frictional loss is underestimate, since the natural circulation flow rate of numerical results is higher by approximately 20% than that of experimental results. (author)

  7. A BWR licensing experience in the USA

    International Nuclear Information System (INIS)

    Powers, J.; Ogura, C.; Arai, K.; Thomas, S.; Mookhoek, B.

    2015-09-01

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  8. A BWR licensing experience in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J.; Ogura, C. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Arai, K. [Toshiba Corporation, Yokohama, Kanagawa (Japan); Thomas, S.; Mookhoek, B., E-mail: jim.powers@toshiba.com [Nuclear Innovation North America, Lake Jackson, Texas (United States)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  9. BWR 90: The ABB advanced BWR design

    International Nuclear Information System (INIS)

    Haukeland, S.; Ivung, B.; Pedersen, T.

    1999-01-01

    ABB has two evolutionary advanced fight water reactors available today - the BWR 90 boiling water reactor and the System 80+ pressurised water reactor. The BWR 90 is based on the design, construction, commissioning and operation of the BWR 75 plants. The operation experience of the six plants of this advanced design has been very good. The average annual energy availability is above 90%, and the total power generation costs have been low. In the development of BWR 90 specific changes were introduced to the reference design, to adapt to technological progress, new safety requirements and to achieve cost savings. The thermal power rating of BWR 90 is 3800 MWth (providing a nominal 1374 MWe net), slightly higher dim that of the reference plant ABB Atom has taken advantage of margins gained using a new generation of its SVEA fuel to attain this power rating without major design modifications. The BWR 90 design was completed and offered to the TVO utility in Finland in 1991, as one of the contenders for the fifth Finnish nuclear power plant project. Thus, the design is available today for deployment in new plant projects. Utility views were incorporated through co-operation with the Finnish utility TVO, owner and operator of the two Olkiluoto plants of BWR 75 design. A review against the European Utility Requirement (EUR) set of requirements has been performed, since the design, in 1997, was selected by the EUR Steering Committee to be the first BWR to be evaluated against the EUR documents. The work is scheduled for completion in 1998. It will be the subject of an 'EUR Volume 3 Subset for BWR 90' document. ABB is continuing its BWR development work with the 'evolutionary' design BWR 90+. The primary design goal is to develop the BWR as a competitive option for the anticipated revival of the market for new nuclear plants beyond the turn of the century, as well as feeding ideas and inputs to the continuous modernisation efforts at operating plants. The development is

  10. Space tug applications. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This article is the final report of the conceptual design efforts for a 'space tug'. It includes preliminary efforts, mission analysis, configuration analysis, impact analysis, and conclusions. Of the several concepts evaluated, the nuclear bimodal tug was one of the top candidates, with the two options being the NEBA-1 and NEBA-3 systems. Several potential tug benefits were identified during the mission analysis. The tug enables delivery of large (>3,500 kg) payloads to the outer planets and it increases the GSO delivery capability by 20% relative to current systems. By providing end of life disposal, the tug can be used to extend the life of existing space assets. It can also be used to reboost satellites which were not delivered to their final orbit by the launch system. A specific mission model is the key to validating the tug concept. Once a mission model can be established, mission analysis can be used to determine more precise propellant quantities and burn times. In addition, the specific payloads can be evaluated for mass and volume capability with the launch systems. Results of the economic analysis will be dependent on the total years of operations and the number of missions in the mission model. The mission applications evaluated during this phase drove the need for large propellant quantities and thus did not allow the payloads to step down to smaller and less expensive launch systems

  11. SCORPIO-BWR: status and future plans

    International Nuclear Information System (INIS)

    Porsmyr, Jan; Bodal, Terje; Beere, William H.

    2004-01-01

    Full text: During the years from 2000 to 2003 a joint project has been performed by IFE, Halden and TEPCO Systems Corporation, Japan, to develop a core monitoring system for BWRs based on the their existing core monitoring system TiARA and the SCORPIO framework. It has been emphasised to develop a reliable, flexible, adaptable and user-friendly system, which is easy to maintain. Therefore, a rather general framework (SCORPIO Framework) has been used which facilitates easy software modifications as well as adding/ replacing physics modules. The software modules is integrated in the SCORPIO framework using the Software Bus as the communication tool and with the Picasso UIMS tool for MMI. The SCORPIO-BWR version is developed on a Windows-PC platform. The SCORPIO-BWR version provides all functions, which are necessary for all analyses and operations performed on a BWR plant and comprises functions for on-line core monitoring, predictive analysis and core management with interfaces to plant instrumentation and physics codes. Functions for system initialisation and maintenance are also included. A SCORPIO-BWR version adapted for ABWR was installed in TEPSYS facilities in Tokyo in January 2003, where the final acceptance tests were carried out and accepted. The ABWR version of the system is now in the verification and validation phase. In the period from April 2003 until March 2004 a project for realizing an offline-version of SCORPIO-BWR system, which supports the offline tasks of BWR in-core fuel management for ABWR and BWR-5 type of reactors, was developed. The offline-version of the SCORPIO-BWR system for ABWR and BWR-5 type of reactors was installed at TEPSYS in March 2003, where the final acceptance tests were carried out and accepted. Plans for the next version of this system is to study the possibility of adapting SCORPIO-BWR to work with 'mobile technology'. This means that it should be possible to access and display information from the SCORPIO-BWR system on a

  12. SCORPIO-BWR: status and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Porsmyr, Jan; Bodal, Terje; Beere, William H. (and others)

    2004-07-01

    Full text: During the years from 2000 to 2003 a joint project has been performed by IFE, Halden and TEPCO Systems Corporation, Japan, to develop a core monitoring system for BWRs based on the their existing core monitoring system TiARA and the SCORPIO framework. It has been emphasised to develop a reliable, flexible, adaptable and user-friendly system, which is easy to maintain. Therefore, a rather general framework (SCORPIO Framework) has been used which facilitates easy software modifications as well as adding/ replacing physics modules. The software modules is integrated in the SCORPIO framework using the Software Bus as the communication tool and with the Picasso UIMS tool for MMI. The SCORPIO-BWR version is developed on a Windows-PC platform. The SCORPIO-BWR version provides all functions, which are necessary for all analyses and operations performed on a BWR plant and comprises functions for on-line core monitoring, predictive analysis and core management with interfaces to plant instrumentation and physics codes. Functions for system initialisation and maintenance are also included. A SCORPIO-BWR version adapted for ABWR was installed in TEPSYS facilities in Tokyo in January 2003, where the final acceptance tests were carried out and accepted. The ABWR version of the system is now in the verification and validation phase. In the period from April 2003 until March 2004 a project for realizing an offline-version of SCORPIO-BWR system, which supports the offline tasks of BWR in-core fuel management for ABWR and BWR-5 type of reactors, was developed. The offline-version of the SCORPIO-BWR system for ABWR and BWR-5 type of reactors was installed at TEPSYS in March 2003, where the final acceptance tests were carried out and accepted. Plans for the next version of this system is to study the possibility of adapting SCORPIO-BWR to work with 'mobile technology'. This means that it should be possible to access and display information from the SCORPIO-BWR

  13. BWR zinc addition Sourcebook

    International Nuclear Information System (INIS)

    Garcia, Susan E.; Giannelli, Joseph F.; Jarvis, Alfred J.

    2014-01-01

    Boiling Water Reactors (BWRs) have been injecting zinc into the primary coolant via the reactor feedwater system for over 25 years for the purpose of controlling primary system radiation fields. The BWR zinc injection process has evolved since the initial application at the Hope Creek Nuclear Station in 1986. Key transitions were from the original natural zinc oxide (NZO) to depleted zinc oxide (DZO), and from active zinc injection of a powdered zinc oxide slurry (pumped systems) to passive injection systems (zinc pellet beds). Zinc addition has continued through various chemistry regimes changes, from normal water chemistry (NWC) to hydrogen water chemistry (HWC) and HWC with noble metals (NobleChem™) for mitigation of intergranular stress corrosion cracking (IGSCC) of reactor internals and primary system piping. While past reports published by the Electric Power Research Institute (EPRI) document specific industry experience related to these topics, the Zinc Sourcebook was prepared to consolidate all of the experience gained over the past 25 years. The Zinc Sourcebook will benefit experienced BWR Chemistry, Operations, Radiation Protection and Engineering personnel as well as new people entering the nuclear power industry. While all North American BWRs implement feedwater zinc injection, a number of other BWRs do not inject zinc. This Sourcebook will also be a valuable resource to plants considering the benefits of zinc addition process implementation, and to gain insights on industry experience related to zinc process control and best practices. This paper presents some of the highlights from the Sourcebook. (author)

  14. Application of the Synthesis method to the calculations of neutron flow in 3D in the enveloping of a BWR reactor with the DORT code

    International Nuclear Information System (INIS)

    Xolocostli M, J.V.; Gomez T, A.M.; Palacios H, J.C.

    2006-01-01

    The surveillance program of the vessel materials of a BWR reactor requires the determination of the neutron flux in 3D in the core enveloping. To carry out these calculations of the neutron flux, the Regulatory Guide 1.190 of the NRC recommends the use of the following codes: MCNP, TORT and DORT. In the case of using the DORT code, the one which solves the transport equation in discreet coordinates and in two dimensions (xy, rθ, and rz), the regulatory guide in reference, requires to make an approach of the flow in three dimensions by means of the call Synthesis Method. It is denominated like this due to that a flow representation in 3D is achieved 'combining' or 'synthesizing' the calculated flows by DORT in rθ, rz and r. In this work the application of the Synthesis Method it is presented, according to the Regulatory Guide 1.190, to determine the 3D flows in a BWR reactor. To achieve the above mentioned it was implemented the Synthesis Method in a computer program developed in the ININ to which is denominated SYNTHESIS. This program applies the synthesis method, and is 'coupled' with the DORT code to determine by this way the neutronic fluxes in 3D on the enveloping of a BWR reactor. (Author)

  15. Study on thermal performance and margins of BWR fuel elements

    International Nuclear Information System (INIS)

    Stosic, Zoran

    1999-01-01

    This paper contributes to developing a methodology of predicting and analyzing thermal performance and margins of Boiling Water Reactor (BWR) fuel assemblies under conditions of reaching high quality Boiling Crisis and subsequent post-dryout thermal hydraulics causing temperature excursion of fuel cladding. Operational margins against dryout and potential for increasing fuel performance with appropriate benefits are discussed. The philosophy of modeling with its special topics are demonstrated on the HECHAN (HEated CHannel ANalyzer) model as the state-of-art for thermal-hydraulics analysis of BWR fuel assemblies in pre- and post-dryout two-phase flow regimes. The scope of further work either being or has to be performed concerning implementation of new physical aspects, including domain extension of HECHAN model applications to the Pressurized Water Reactors (PWRs), is discussed. Finally, a comprehensive overview of the literature dealing with development of the model is given. (author)

  16. Twenty-fifth water reactor safety information meeting: Proceedings. Volume 1: Plenary sessions; Pressure vessel research; BWR strainer blockage and other generic safety issues; Environmentally assisted degradation of LWR components; Update on severe accident code improvements and applications

    International Nuclear Information System (INIS)

    Monteleone, S.

    1998-03-01

    This three-volume report contains papers presented at the conference. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Japan, Norway, and Russia. The titles of the papers and the names of the authors have been updated and may differ from those that appeared in the final program of the meeting. This volume contains the following information: (1) plenary sessions; (2) pressure vessel research; (3) BWR strainer blockage and other generic safety issues; (4) environmentally assisted degradation of LWR components; and (5) update on severe accident code improvements and applications. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database

  17. Twenty-fifth water reactor safety information meeting: Proceedings. Volume 1: Plenary sessions; Pressure vessel research; BWR strainer blockage and other generic safety issues; Environmentally assisted degradation of LWR components; Update on severe accident code improvements and applications

    Energy Technology Data Exchange (ETDEWEB)

    Monteleone, S. [comp.] [Brookhaven National Lab., Upton, NY (United States)

    1998-03-01

    This three-volume report contains papers presented at the conference. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Japan, Norway, and Russia. The titles of the papers and the names of the authors have been updated and may differ from those that appeared in the final program of the meeting. This volume contains the following information: (1) plenary sessions; (2) pressure vessel research; (3) BWR strainer blockage and other generic safety issues; (4) environmentally assisted degradation of LWR components; and (5) update on severe accident code improvements and applications. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  18. The BWR Stability Issue

    International Nuclear Information System (INIS)

    D'Auria, F.

    2008-01-01

    The purpose of this paper is to supply general information about Boiling Water Reactor (BWR) stability. The main concerned topics are: phenomenological aspects, experimental database, modelling features and capabilities, numerical models, three-dimensional modelling, BWR system performance during stability, stability monitoring and licensing aspects.

  19. Behavior of shut-down dose rate of recirculation piping of BWR under noble metal application

    International Nuclear Information System (INIS)

    Fuse, Motomasa; Nagase, Makoto; Aizawa, Motohiro; Wada, Yoichi; Ishida, Kazushige; Hosokawa, Hideyuki; Hettiarachchi, Samson; Weber, Christoph

    2014-01-01

    The cause of shut-down dose rate change of the recirculation piping observed in KKM (Kern Kraftwerk Mühleberg) after application of noble metal injection method is analyzed. The plant experienced the sharp decrease of piping dose rate in the cycle just after the application of noble metal(classic NobleChem TM ) and re-buildup of radioactivity in the subsequent several cycles. After the application of online noble metal injection (online NobleChem TM ), gradual decrease of dose rate has been observed. The presence of a certain amount of noble metal on the iron rich oxide film promotes the dissolution of the oxide under hydrogen addition, resulting in a decrease of deposited noble metal on the oxide film surface as well as of radioactive species in the film. Under the condition of lower amount of noble metal on the surface oxides, the oxidant species, especially hydrogen peroxide, slightly increases facilitating the re-growth of iron rich oxides along with re-buildup of radioactivity. After the application of online noble metal injection during each cycle, gradual dissolution of iron rich oxides and gradual decrease of radioactivity in the oxides proceed to decrease the piping dose rate. In the radioactivity decreasing phase, the presence of zinc is considered to assist the suppression of radioactivity buildup in the oxide film. From the analysis, treating piping surface with platinum after chemical decontamination process is expected to work well for suppression of the piping dose rate. (author)

  20. Theory and control calculations. Application to BWR and PWR; Teoria y calculo de elementos de control, Aplicacion a PWR y BWR

    Energy Technology Data Exchange (ETDEWEB)

    Velarde, G; Guerra, J

    1972-07-01

    A theoretical method to extend the applicability of P{sub 1} approximation to strong absorbers is given. Tables of effective diffusion parameters for slab and cylindrical geometry as well as a summary of expressions for obtaining the extrapolation length in cases of interest, are included. (Author) 21 refs.

  1. Detecting long-range correlation with detrended fluctuation analysis: Application to BWR stability

    Energy Technology Data Exchange (ETDEWEB)

    Espinosa-Paredes, Gilberto [Departamento de Ingenieria de Procesos e Hidraulica, Universidad Autonoma Metropolitana-Iztapalapa, Apartado Postal 55-534, Mexico, DF 09340 (Mexico)]. E-mail: gepe@xanum.uam.mx; Alvarez-Ramirez, Jose [Departamento de Ingenieria de Procesos e Hidraulica, Universidad Autonoma Metropolitana-Iztapalapa, Apartado Postal 55-534, Mexico, DF 09340 (Mexico); Vazquez, Alejandro [Departamento de Ingenieria de Procesos e Hidraulica, Universidad Autonoma Metropolitana-Iztapalapa, Apartado Postal 55-534, Mexico, DF 09340 (Mexico)

    2006-11-15

    The aim of this paper is to explore the application of detrended fluctuation analysis (DFA) to study boiling water reactor stability. DFA is a scaling method commonly used for detecting long-range correlations in non-stationary time series. This method is based on the random walk theory and was applied to neutronic power signal of Forsmark stability benchmark. Our results shows that the scaling properties breakdown during unstable oscillations.

  2. Consistency considerations in the use of point kinetics for BWR application

    International Nuclear Information System (INIS)

    Holzer, J.M.; Habert, R.; Pilat, E.E.

    1981-01-01

    The basic question of producing point reactivity parameters for use in RETRAN anaylses is addressed. The technique used in establishing a methodology consists of a stepwise reduction of resolution, in space and time, so as to identify possible areas in which error may be induced and to establish procedures that retain consistency and accuracy. The presented calculational flow plan culminating from this analysis will ultimately be used at Yankee Atomic Electric for design application

  3. Detecting long-range correlation with detrended fluctuation analysis: Application to BWR stability

    International Nuclear Information System (INIS)

    Espinosa-Paredes, Gilberto; Alvarez-Ramirez, Jose; Vazquez, Alejandro

    2006-01-01

    The aim of this paper is to explore the application of detrended fluctuation analysis (DFA) to study boiling water reactor stability. DFA is a scaling method commonly used for detecting long-range correlations in non-stationary time series. This method is based on the random walk theory and was applied to neutronic power signal of Forsmark stability benchmark. Our results shows that the scaling properties breakdown during unstable oscillations

  4. Applicability of the diffusion and simplified P3 theories for BWR pin-by-pin core analysis

    International Nuclear Information System (INIS)

    Tada, Kenichi; Yamamoto, Akio; Kitamura, Yasunori; Yamane, Yoshihiro; Watanabe, Masato; Noda, Hiroshi

    2007-01-01

    The pin-by-pin fine mesh core calculation method is considered as a candidate of next-generation core calculation method for BWR. In this study, the diffusion and the simplified P 3 (SP 3 ) theories are applied to the pin-by-pin core analysis of BWR. Performances of the diffusion and the SP 3 theories for cell-homogeneous pin-by-pin fine mesh BWR core analysis are evaluated through comparison with cell-heterogeneous detailed transport calculation by the method of characteristics (MOC). In this study, two-dimensional, 2x2 multi-assemblies geometry is used to compare the prediction accuracies of the diffusion and the SP 3 theories. The 2x2 multi- assemblies geometry consists of two types of 9x9 UO 2 assembly that have two different enrichment splittings. To mitigate the cell-homogenization error, the SPH method is applied for the pin-by-pin fine mesh calculation. The SPH method is a technique that reproduces a result of heterogeneous calculation by that of homogeneous calculation. The calculation results indicated that diffusion theory shows larger discrepancy than that of SP 3 theory on pin-wise fission rates. Furthermore, the accuracy of the diffusion theory would not be sufficient for the pin-by-pin fine mesh calculation. In contrast to the diffusion theory, the SP 3 theory shows much better accuracy on pin wise fission rates. Therefore, if the SP 3 theory is applied, the accuracy of the pin-by-pin fine mesh BWR core analysis will be higher and will be sufficient for production calculation. (author)

  5. Development of a fuzzy logic method to build objective functions in optimization problems: application to BWR fuel lattice design

    International Nuclear Information System (INIS)

    Martin-del-Campo, C.; Francois, J.L.; Barragan, A.M.; Palomera, M.A.

    2005-01-01

    In this paper we develop a methodology based on the use of the Fuzzy Logic technique to build multi-objective functions to be used in optimization processes applied to in-core nuclear fuel management. As an example, we selected the problem of determining optimal radial fuel enrichment and gadolinia distributions in a typical 'Boiling Water Reactor (BWR)' fuel lattice. The methodology is based on the use of the mathematical capability of Fuzzy Logic to model nonlinear functions of arbitrary complexity. The utility of Fuzzy Logic is to map an input space into an output space, and the primary mechanism for doing this is a list of if-then statements called rules. The rules refer to variables and adjectives that describe those variables and, the Fuzzy Logic technique interprets the values in the input vectors and, based on the set of rules assigns values to the output vector. The methodology was developed for the radial optimization of a BWR lattice where the optimization algorithm employed is Tabu Search. The global objective is to find the optimal distribution of enrichments and burnable poison concentrations in a 10*10 BWR lattice. In order to do that, a fuzzy control inference system was developed using the Fuzzy Logic Toolbox of Matlab and it has been linked to the Tabu Search optimization process. Results show that Tabu Search combined with Fuzzy Logic performs very well, obtaining lattices with optimal fuel utilization. (authors)

  6. BWR type reactors

    International Nuclear Information System (INIS)

    Watanabe, Shoichi

    1986-01-01

    Purpose: To enable to remove water not by way of mechanical operation in a reactor core and improve the fuel economy in BWR type reactors. Constitution: A hollow water removing rod of a cross-like profile made of material having a smaller neutron absorption cross section than the moderator is disposed to the water gap for each of unit structures composed of four fuel assemblies, and water is charged and discharged to and from the water removing rod. Water is removed from the water removing rod to decrease the moderators in the water gap to carry out neutron spectrum shift operation from the initial to the medium stage of reactor core cycles. At the final stage of the cycle, airs in the water removing rod are extracted and the moderator is introduced. The moderator is filled and the criticality is maintained with the accumulated nuclear fission materials. The neutron spectrum shift operation can be attained by eliminating hydrothermodynamic instability and using a water removing rod of a simple structure. (Horiuchi, T.)

  7. Assembly Discontinuity Factors for the Neutron Diffusion Equation discretized with the Finite Volume Method. Application to BWR

    International Nuclear Information System (INIS)

    Bernal, A.; Roman, J.E.; Miró, R.; Verdú, G.

    2016-01-01

    Highlights: • A method is proposed to solve the eigenvalue problem of the Neutron Diffusion Equation in BWR. • The Neutron Diffusion Equation is discretized with the Finite Volume Method. • The currents are calculated by using a polynomial expansion of the neutron flux. • The current continuity and boundary conditions are defined implicitly to reduce the size of the matrices. • Different structured and unstructured meshes were used to discretize the BWR. - Abstract: The neutron flux spatial distribution in Boiling Water Reactors (BWRs) can be calculated by means of the Neutron Diffusion Equation (NDE), which is a space- and time-dependent differential equation. In steady state conditions, the time derivative terms are zero and this equation is rewritten as an eigenvalue problem. In addition, the spatial partial derivatives terms are transformed into algebraic terms by discretizing the geometry and using numerical methods. As regards the geometrical discretization, BWRs are complex systems containing different components of different geometries and materials, but they are usually modelled as parallelepiped nodes each one containing only one homogenized material to simplify the solution of the NDE. There are several techniques to correct the homogenization in the node, but the most commonly used in BWRs is that based on Assembly Discontinuity Factors (ADFs). As regards numerical methods, the Finite Volume Method (FVM) is feasible and suitable to be applied to the NDE. In this paper, a FVM based on a polynomial expansion method has been used to obtain the matrices of the eigenvalue problem, assuring the accomplishment of the ADFs for a BWR. This eigenvalue problem has been solved by means of the SLEPc library.

  8. Application of reliability techniques to prioritize BWR [boiling water reactor] recirculation loop welds for in-service inspection

    International Nuclear Information System (INIS)

    Holman, G.S.

    1989-12-01

    In January 1988 the US Nuclear Regulatory Commission issued Generic Letter 88-01 together with NUREG-0313, Revision 2, ''Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping,'' to implement NRC long-range plans for addressing the problem of stress corrosion cracking in boiling water reactor piping. NUREG-0313 presents guidelines for categorizing BWR pipe welds according to their SCC condition (e.g., presence of known cracks, implementation of measures for mitigating SCC) as well as recommended inspection schedules (e.g., percentage of welds inspected, inspection frequency) for each weld category. NUREG-0313 does not, however, specify individual welds to be inspected. To address this issue, the Lawrence Livermore National Laboratory developed two recommended inspection samples for welds in a typical BWR recirculation loop. Using a probabilistic fracture mechanics model, LLNL prioritized loop welds on the basis of estimated leak probabilities. The results of this evaluation indicate that riser welds and bypass welds should be given priority attention over other welds. Larger-diameter welds as a group can be considered of secondary importance compared to riser and bypass welds. A ''blind'' comparison between the probability-based inspection samples and data from actual field inspections indicated that the probabilistic analysis generally captured the welds which the field inspections identified as warranting repair or replacement. Discrepancies between the field data and the analytic results can likely be attributed to simplifying assumptions made in the analysis. The overall agreement between analysis and field experience suggests that reliability techniques -- when combined with historical experience -- represent a sound technical basis on which to define meaningful weld inspection programs. 13 refs., 8 figs., 5 tabs

  9. Interpretation of incore noise measurements in BWR's

    International Nuclear Information System (INIS)

    Dam, H. van

    1983-01-01

    A survey is given of the main incentives for power reactor noise research, and the differences and similarities of noise in power and zero power systems are shown. After a short outline of historical developments the basic characteristics of the adjoint method in reactor noise theory are dealt with. The detector adjoint functions describe the transfer functions between spatially distributed noise sources and a (neutron or gamma) detector. In particular, the spatial dependence of these functions explains the 'local' and 'global' effects in BWR noise measurements. By including thermal hydraulic feedback effects in the adjoint analysis, it is shown that the common idea of a dominant global effect at low frequencies, which should result in point kinetic behaviour, is erroneous. The same analysis provides a method for nonperturbing on-line measurements on a BWR in The Netherlands. In the final part of the paper some ideas are given for further research in the field of BWR noise. (author)

  10. Application of the MOVE algorithm for the identification of reduced order models of a core of a BWR type reactor

    International Nuclear Information System (INIS)

    Victoria R, M.A.; Morales S, J.B.

    2005-01-01

    Presently work is applied the modified algorithm of the ellipsoid of optimal volume (MOVE) to a reduced order model of 5 differential equations of the core of a boiling water reactor (BWR) with the purpose of estimating the parameters that model the dynamics. The viability is analyzed of carrying out an analysis that calculates the global dynamic parameters that determine the stability of the system and the uncertainty of the estimate. The modified algorithm of the ellipsoid of optimal volume (MOVE), is a method applied to the parametric identification of systems, in particular to the estimate of groups of parameters (PSE for their initials in English). It is looked for to obtain the ellipsoid of smaller volume that guarantees to contain the real value of the parameters of the model. The PSE MOVE is a recursive identification method that can manage the sign of noise and to ponder it, the ellipsoid represents an advantage due to its easy mathematical handling in the computer, the results that surrender are very useful for the design of Robust Control since to smaller volume of the ellipsoid, better is in general the performance of the system to control. The comparison with other methods presented in the literature to estimate the reason of decline (DR) of a BWR is presented. (Author)

  11. BWR emergency procedure guidelines

    International Nuclear Information System (INIS)

    Post, J.S.; Karner, E.F.; Stratman, R.A.

    1984-01-01

    This chapter describes plans for dealing with reactor accidents developed by the Boiling Water Reactor (BWR) Owners' Group in response to post-Three Mile Island US NRC requirements. The devised Emergency Procedure Guidelines (EPGs), applicable to all BWRs, are symptom-based rather than event-based. According to the EPGs, the operator does not need to identify what event is occurring in the plant in order to decide what action to take, but need only observe the symptoms (values and trends of key control parameters) which exist and take appropriate action to control these symptoms. The original objective was to provide reactor operator guidance in responding to a small break loss-of-coolant accident (LOCA), but subsequent revisions have included other types of reactor accidents. Topics considered include the reactor pressure vessel (RPV) control guideline, the primary containment control guideline, the secondary containment control guideline, the radioactivity release control guideline, multiple failures vs. the design basis, safe limits vs. technical specifications, the technical status, licensing, and implementation. The EPGs are based upon maintaining both adequate core cooling and primary containment integrity

  12. A PC Mathcad-based computational aid for severe accident analysis and its application to a BWR small LOCA sequence

    International Nuclear Information System (INIS)

    Wu, Laung-Kuang T.; Lee, S.J.

    2004-01-01

    A PC-based Mathcad program is used to develop a computational aid for analyzing severe accident phenomena. This computational aid uses simple engineering expressions and empirical correlations to estimate key quantities and timings at various stages of accident progressions. In this paper, the computational aid is applied to analyze an early phase of a BWR small LOCA sequence. The accident phenomena analyzed include: break flow rates, boiled-up water level in the core, core uncovery time, depressurization of the reactor pressure vessel, core heat-up, onset of clad oxidation, hydrogen generation, and onset of fuel relocation. The results are compared with those obtained running the MAAP 3.0B code. This PC-based computational aid can be used to train plant personnel in understanding severe accident phenomena and to assist them in managing severe accidents. (author)

  13. Flex concept for US-A BWR extended loss of AC power events

    International Nuclear Information System (INIS)

    Powers, J.; Aoyagi, Y.; Kataoka, K.; Thomas, S.; Mookhoek, B.

    2015-09-01

    The US-Advanced Boiling Water Reactor (US-A BWR), certified by the US NRC, is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (Stp 3 and 4) Combined License Application (Cola) and incorporates numerous design and technology enhancements for improved safety performance. Nuclear Innovation North America (NINA) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The Stp 3 and 4 project has finished the US NRC technical review of the Cola, and the final safety evaluation report (FSER) is scheduled to be issued by the US NRC in 2015. Following the accident at the Fukushima Dai-ichi plant, the US-A BWR was reviewed for Beyond Design Basis Event (BDBE) safety using industry and regulatory guidance for US NRC Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation of Beyond Design Basis External Events (BDBEE). By virtue of the design approach, the US-A BWR is capable of providing an indefinite coping period for a station blackout. The use of installed systems with extended coping times is a significant advantage of the US-A BWR compared to most of the plants currently operating in the U.S. In addition, the Stp 3 and 4 design incorporates enhancements consistent with the current US industry Diverse and Flexible Coping Strategies (Flex) initiative. The final technical topic requiring review by the US NRC Advisory Committee on Reactor Safeguards was the Flex Integrated Plan submitted by NINA, and this review was successfully completed. This paper summarizes the progress of the US-A BWR in licensing the Flex Integrated Plan for the project, and describes the technology and features of the US-A BWR design that contribute to safety post-Fukushima. It also provides an informational comparison of the design capabilities of the US-A BWR for extreme external events, and relates these capabilities to re

  14. Flex concept for US-A BWR extended loss of AC power events

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Aoyagi, Y.; Kataoka, K. [Toshiba Corporation, Kawasaki, Kanagawa (Japan); Thomas, S.; Mookhoek, B., E-mail: jim.powers@toshiba.com [Nuclear Innovation North America, Lake Jackson, Texas (United States)

    2015-09-15

    The US-Advanced Boiling Water Reactor (US-A BWR), certified by the US NRC, is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (Stp 3 and 4) Combined License Application (Cola) and incorporates numerous design and technology enhancements for improved safety performance. Nuclear Innovation North America (NINA) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The Stp 3 and 4 project has finished the US NRC technical review of the Cola, and the final safety evaluation report (FSER) is scheduled to be issued by the US NRC in 2015. Following the accident at the Fukushima Dai-ichi plant, the US-A BWR was reviewed for Beyond Design Basis Event (BDBE) safety using industry and regulatory guidance for US NRC Order EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation of Beyond Design Basis External Events (BDBEE). By virtue of the design approach, the US-A BWR is capable of providing an indefinite coping period for a station blackout. The use of installed systems with extended coping times is a significant advantage of the US-A BWR compared to most of the plants currently operating in the U.S. In addition, the Stp 3 and 4 design incorporates enhancements consistent with the current US industry Diverse and Flexible Coping Strategies (Flex) initiative. The final technical topic requiring review by the US NRC Advisory Committee on Reactor Safeguards was the Flex Integrated Plan submitted by NINA, and this review was successfully completed. This paper summarizes the progress of the US-A BWR in licensing the Flex Integrated Plan for the project, and describes the technology and features of the US-A BWR design that contribute to safety post-Fukushima. It also provides an informational comparison of the design capabilities of the US-A BWR for extreme external events, and relates these capabilities to re

  15. Benchmarking of AREVA BWR FDIC-PEZOG model against first BFE3 cycle 15 application of On-Line NobleChem results

    International Nuclear Information System (INIS)

    Pop, M.G.; Lamanna, L.S.; Hoornik, A.; Storey, G.C.; Lemons, J.F.

    2015-01-01

    The combination of AREVA's BWR FDIC-PEZOG tools allows the calculation of the total liftoff as a measure of fuel performance and a risk indicator for fuel reliability. The AREVA BWR FDIC tool is a crud modeling tool. The PEZOG tool models the platinum-enhanced zirconium oxide growth of fuel cladding when exposed to platinum during operation. Continuous effort to improve these tools used for the total liftoff calculations is illustrated by the benchmarking of the tools after the application of On-Line NobleChem TM at TVA Browns Ferry Unit 3 during Cycle 15. A set of runs using the modified FDIC-PEZOG model and actual plant water chemistry for Cycle 15 and partial data for Cycle 16 were performed. The updated results' deposit thickness and deposit composition predictions for EOC15 were compared to the measured data from EOC15 and are presented in this paper. The updated predicted deposit thickness matched the actual, measured value exactly. Predicted deposit composition near the fuel rod boundary, nearer to the bulk reactor water, and as an averaged deposit, as presented in the paper, compared extremely well with the measured data at EOC15. The updated AREVA methodology resulted in lower fuel oxide thickness predictions over the life of the fuel as compared to the initial evaluations for BFE3 by incorporating more recent experimental data on the thermal conductivity of zirconia; unnecessary conservatism in the prediction of the fuel oxide thickness over the life of the fuel was removed in the improved model. (authors)

  16. Level-Swell Prediction With RETRAN-3D And Its Application To A BWR Steam-Line-Break Analysis

    International Nuclear Information System (INIS)

    Aounallah, Y.; Hofer, K.

    2003-01-01

    Level-swell experiments have often been simulated using system codes, such as TRAC and RELAP, but only cursory assessments have been performed with the operational-transient code RETRAN-3D, the main system code used within the STARS project. The present study, initiated in the framework of a BWR Steam-Line-Break (SLB) accident scenario, addresses this lacuna by performing RETRAN simulations of the General Electric Level-Swell experiments, and by investigating their implications on power plant accident analyses. Parameters to which the predicted level swell is sensitive have been identified, and recommendations on code options are made. The SLB analysis objective was to determine the amount of steam and liquid discharged through the break under specified boundary conditions, and to gauge the results against reference values. The impact of the nodalization of the upper part of the reactor pressure vessel was investigated and found to play an important role, whereas the level swell induced from flashing was found not to be the predominant factor for these simulations. (author)

  17. Residual stress analysis in BWR pressure vessel attachments

    International Nuclear Information System (INIS)

    Dexter, R.J.; Leung, C.P.; Pont, D.

    1992-06-01

    Residual stresses from welding processes can be the primary driving force for stress corrosion cracking (SCC) in BWR components. Thus, a better understanding of the causes and nature of these residual stresses can help assess and remedy SCC. Numerical welding simulation software, such as SYSWELD, and material property data have been used to quantify residual stresses for application to SCC assessments in BWR components. Furthermore, parametric studies using SYSWELD have revealed which variables significantly affect predicted residual stress. Overall, numerical modeling techniques can be used to evaluate residual stress for SCC assessments of BWR components and to identify and plan future SCC research

  18. Development of a BWR core burn-up calculation code COREBN-BWR

    International Nuclear Information System (INIS)

    Morimoto, Yuichi; Okumura, Keisuke

    1992-05-01

    In order to evaluate core performances of BWR type reactors, the three dimensional core burnup calculation code COREBN-BWR and the fuel management code HIST-BWR have been developed. In analyses of BWR type reactors, thermal hydraulics calculations must be coupled with neutronics calculations to evaluate core performances, because steam void distribution changes according to the change of the power distribution. By installing new functions as follows to the three dimensional core burnup code COREBN2 developed in JAERI for PWR type reactor analyses, the code system becomes to be applicable to burnup analyses of BWR type reactors. (1) Macroscopic cross section calculation function taking into account of coolant void distribution. (2) Thermal hydraulics calculation function to evaluate core flow split, coolant void distribution and thermal margin. (3) Burnup calculation function under the Haling strategy. (4) Fuel management function to incorporate the thermal hydraulics information. This report consists of the general description, calculational models, input data requirements and their explanations, detailed information on usage and sample input. (author)

  19. Application of the coupled code Athlet-Quabox/Cubbox for the extreme scenarios of the OECD/NRC BWR turbine trip benchmark and its performance on multi-processor computers

    International Nuclear Information System (INIS)

    Langenbuch, S.; Schmidt, K.D.; Velkov, K.

    2003-01-01

    The OECD/NRC BWR Turbine Trip (TT) Benchmark is investigated to perform code-to-code comparison of coupled codes including a comparison to measured data which are available from turbine trip experiments at Peach Bottom 2. This Benchmark problem for a BWR over-pressure transient represents a challenging application of coupled codes which integrate 3-dimensional neutron kinetics into thermal-hydraulic system codes for best-estimate simulation of plant transients. This transient represents a typical application of coupled codes which are usually performed on powerful workstations using a single CPU. Nowadays, the availability of multi-CPUs is much easier. Indeed, powerful workstations already provide 4 to 8 CPU, computer centers give access to multi-processor systems with numbers of CPUs in the order of 16 up to several 100. Therefore, the performance of the coupled code Athlet-Quabox/Cubbox on multi-processor systems is studied. Different cases of application lead to changing requirements of the code efficiency, because the amount of computer time spent in different parts of the code is varying. This paper presents main results of the coupled code Athlet-Quabox/Cubbox for the extreme scenarios of the BWR TT Benchmark together with evaluations of the code performance on multi-processor computers. (authors)

  20. Application of the MOVE algorithm for the identification of reduced order models of a core of a BWR type reactor; Aplicacion del algoritmo MOVE para la identificacion de modelos de orden reducido del nucleo de un reactor tipo BWR

    Energy Technology Data Exchange (ETDEWEB)

    Victoria R, M.A.; Morales S, J.B. [UNAM, DEPFI, Campus Morelos, en IMTA Jiutepec, Morelos (Mexico)]. e-mail: angelvr@gmail.com

    2005-07-01

    Presently work is applied the modified algorithm of the ellipsoid of optimal volume (MOVE) to a reduced order model of 5 differential equations of the core of a boiling water reactor (BWR) with the purpose of estimating the parameters that model the dynamics. The viability is analyzed of carrying out an analysis that calculates the global dynamic parameters that determine the stability of the system and the uncertainty of the estimate. The modified algorithm of the ellipsoid of optimal volume (MOVE), is a method applied to the parametric identification of systems, in particular to the estimate of groups of parameters (PSE for their initials in English). It is looked for to obtain the ellipsoid of smaller volume that guarantees to contain the real value of the parameters of the model. The PSE MOVE is a recursive identification method that can manage the sign of noise and to ponder it, the ellipsoid represents an advantage due to its easy mathematical handling in the computer, the results that surrender are very useful for the design of Robust Control since to smaller volume of the ellipsoid, better is in general the performance of the system to control. The comparison with other methods presented in the literature to estimate the reason of decline (DR) of a BWR is presented. (Author)

  1. An application of risk-informed evaluation on MOVs and AOVs for Taiwan BWR-type nuclear power plants

    International Nuclear Information System (INIS)

    Ting, K.; Chen, K.T.; Li, Y.C.; Hwang, S.H.; Chien, F.T.; Kang, J.C.

    2008-01-01

    Implementing a risk-informed inservice testing (RI-IST) program provides a good aspect to the nuclear power plant licensee as an alternating program in the current ASME Section XI and 10 CFR 50.55a relevant testing programs. RI-IST concentrates testing resources on highly significant components, reduces excess testing burden, increases plant's availability, decreases dose rate on the plant's staff and also reduces cost on plant's operation and maintenance under nuclear safety expectations. Furthermore, RI-IST also gives a feature on prospective licensing change basis to a nuclear power plant's licensee. This study will focus on safety-related and PRA-molded motor-operated valves (MOVs) and air-operated valves (AOVs) under the inservice testing program in boiling water reactor (BWR)-type nuclear power plant. As MOVs and AOVs have crucial safety functions throughout the nuclear power plant's safety systems, the steady operation and performance of MOVs and AOVs will definitely ensure that the nuclear power plant operates under safety expectations; therefore, this is the key reason to implement risk-informed evaluation for MOVs and AOVs in this study and being able to provide the safety significance classification for MOVs and AOVs under the current IST program to the plant's management. As a pilot study of RI-IST, the methodology of qualitative assessment will incorporate with probabilistic risk assessment (PRA) analyzing MOVs' and AOVs' safety significance within the current PRA model. The evaluating result will then classify its safety significance into a high-safety significant component (HSSC) and a low-safety significant component (LSSC) for MOVs and AOVs based on relevant regulatory criteria. With this initiating achievement, it can provide a cornerstone for further studies on the other types of valves and pumps in RI-IST program and also provide a valuable reference as proposing license change to the licensee

  2. BWR stability analysis

    International Nuclear Information System (INIS)

    Valtonen, K.

    1990-01-01

    The objective of this study has been to examine TVO-I oscillation incident, which occured in February 22.1987 and to find out safety implications of oscillations in ATWS incidents. Calculations have been performed with RAMONA-3B and TRAB codes. RAMONA-3B is a BWR transient analysis code with three-dimencional neutron kinetics and nonequilibrium, nonhomogeneous thermal hydraulics. TRAB code is a one-dimencional BWR transient code which uses methods similar to RAMONA-3B. The results have shown that both codes are capable of analyzing of the oscillation incidents. Both out-of-phase and in-phase oscillations are possible. If the reactor scram fails (ATWS) during oscillations the severe fuel failures are always possible and the reactor core may exceed the prompt criticality

  3. BWR AXIAL PROFILE

    International Nuclear Information System (INIS)

    Huffer, J.

    2004-01-01

    The purpose of this calculation is to develop axial profiles for estimating the axial variation in burnup of a boiling water reactor (BWR) assembly spent nuclear fuel (SNF) given the average burnup of an assembly. A discharged fuel assembly typically exhibits higher burnup in the center and lower burnup at the ends of the assembly. Criticality safety analyses taking credit for SNF burnup must account for axially varying burnup relative to calculations based on uniformly distributed assembly average burnup due to the under-burned tips. Thus, accounting for axially varying burnup in criticality analyses is also referred to as accounting for the ''end effect'' reactivity. The magnitude of the reactivity change due to ''end effect'' is dependent on the initial assembly enrichment, the assembly average burnup, and the particular axial profile characterizing the burnup distribution. The set of bounding axial profiles should incorporate multiple BWR core designs and provide statistical confidence (95 percent confidence that 95 percent of the population is bound by the profile) that end nodes are conservatively represented. The profiles should also conserve the overall burnup of the fuel assembly. More background on BWR axial profiles is provided in Attachment I

  4. Siemens Nuclear Power Corporation methods development for BWR/PWR reactor licensing

    International Nuclear Information System (INIS)

    Pruitt, D.W.

    1992-01-01

    This presentation addresses the Siemens Nuclear Power Corporation (SNP) perspective on the primary forces driving methods development in the nuclear industry. These forces are fuel design, computational environment and industry requirement evolution. The first segment of the discussion presents the SNP experience base. SNP develops, manufactures and licenses both BWR and PWR reload fuel. A review of this experience base highlights the accelerating rate at which new fuel designs are being introduced into the nuclear industry. The application of advanced BWR lattice geometries provides an example of fuel design trends. The second aspect of the presentation is the rapid evolution of the computing environment. The final subject in the presentation is the impact of industry requirements on code or methods development

  5. Behaviour of the reactivity for BWR fuel cells; Comportamiento de la reactividad para celdas de combustible BWR

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, J. A.; Alonso, G.; Delfin, A.; Vargas, S. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Del Valle G, E., E-mail: galonso@inin.gob.mx [IPN, Escuela Superior de Fisica y Matematicas, U. P. Adolfo Lopez Mateos, Col. Lindavista, 07738 Mexico D. F. (Mexico)

    2011-11-15

    In this work the behaviour of the reactivity of a fuel assembly type BWR was studied, the objective is to obtain some expressions that consider the average enrichment of U-235 and the gadolinium concentration like a function of the fuel cells burnt. Also, the applicability of the lineal reactivity model was analyzed for fuel cells type BWR. The analysis was carried out with the CASMO-4 code. (Author)

  6. Advances in BWR water chemistry

    International Nuclear Information System (INIS)

    Garcia, Susan E.; Giannelli, Joseph F.; Jarvis, Mary L.

    2012-09-01

    This paper reviews recent advances in Boiling Water Reactor (BWR) water chemistry control with examples of plant experiences at U.S. designed BWRs. Water chemistry advances provide some of the most effective methods for mitigating materials degradation, reducing fuel performance concerns and lowering radiation fields. Mitigation of stress corrosion cracking (SCC) of materials remains a high priority and improved techniques that have been demonstrated in BWRs will be reviewed, specifically hydrogen injection combined with noble metal chemical addition (NMCA) and the newer on-line noble metal application process (OLNC). Hydrogen injection performance, an important part of SCC mitigation, will also be reviewed for the BWR fleet, highlighting system improvements that have enabled earlier injection of hydrogen including the potential for hydrogen injection during plant startup. Water chemistry has been significantly improved by the application of pre-filtration and optimized use of ion exchange resins in the CP (condensate polishing) and reactor water cleanup (RWCU) systems. EPRI has monitored and supported water treatment improvements to meet water chemistry goals as outlined in the EPRI BWR Water Chemistry Guidelines, particularly those for SCC mitigation of reactor internals and piping, minimization of fuel risk due to corrosion and crud deposits and chemistry control for radiation field reduction. In recent years, a significant reduction has occurred in feedwater corrosion product input, particularly iron. A large percentage of plants are now reporting <0.1 ppb feedwater iron. The impacts to plant operation and chemistry of lower feedwater iron will be explored. Depleted zinc addition is widely practiced across the fleet and the enhanced focus on radiation reduction continues to emphasize the importance of controlling radiation source term. In addition, shutdown chemistry control is necessary to avoid excessive release of activated corrosion products from fuel

  7. Applicability of eddy current inversion techniques to the sizing of defects in Inconel welds of BWR internals

    International Nuclear Information System (INIS)

    Yusa, Noritaka; Janousek, Ladislav; Rebican, Mihai; Chen, Zhenmao; Miya, Kenzo; Machida, Eiji

    2004-01-01

    This paper evaluates the applicability of eddy current inversion techniques to the sizing of defects in Inconel welds with rough surfaces. For this purpose, a plate Inconel weld specimen, which models the welding of a stub tube in a boiling water nuclear reactor, is fabricated, and artificial notches machined into the specimen. Eddy current inspections using six probes in weld inspection evaluated. It is revealed that if suitable probes are applied, an Inconel weld does not provide large noise signals in eddy current inspections even though the surface of the weld is rough. Finally, reconstruction of the notches are performed using eddy current signals measured with the use of the uniform eddy current probe that showed the best results among the six probes in the inspection. A simplified configuration is proposed in order to consider the complicated configuration of the welded specimen in numerical simulations. While reconstructed profiles of the notches are slightly larger than the true profiles, quite good agreements are obtained in spite of the simple approximation of the configuration, which reveals that eddy current testing would be an efficient non-destructive testing method for the sizing of defects in Inconel welds. (author)

  8. The AutoAssociative Neural Network in signal analysis: II. Application to on-line monitoring of a simulated BWR component

    International Nuclear Information System (INIS)

    Marseguerra, M.; Zoia, A.

    2005-01-01

    In this paper, Robust AutoAssociative Neural Networks (RAANN) are applied to a series of signals produced by the Halden simulator of the 1200MWe BWR Forsmark-3 plant in Sweden. The applications concern: - correction of drifts and gross errors in sensors, for diagnostic and control purposes, - cluster analysis, to individuate a failed component and the intensity of the failure, - forecasting system signals, for safety or economic purposes, - reconstruction of unmeasured signals (virtual sensors). In the attainment of the above results, the geometric interpretation of the mapping performed by the network, propounded in Part I of this work, has provided a reasoned choice of the most critical free parameter, i.e., the number f of nodes of the bottleneck layer, thus allowing a deep understanding of the network functioning and also avoiding the traditional and troubling procedure of selection by trial-and-error. The theoretical basis of this analysis, discussed in details in the companion paper, is founded on the idea of dimension and in particular of fractal dimension, which has been used as a numerical estimator of f

  9. Best-estimate analysis development for BWR systems

    International Nuclear Information System (INIS)

    Sutherland, W.A.; Alamgir, M.; Kalra, S.P.; Beckner, W.D.

    1986-01-01

    The Full Integral Simulation Test (FIST) Program is a three pronged approach to the development of best-estimate analysis capability for BWR systems. An experimental program in the FIST BWR system simulator facility extends the LOCA data base and adds operational transients data. An analytical method development program with the BWR-TRAC computer program extends the modeling of BWR specific components and major interfacing systems, and improves numerical techniques to reduce computer running time. A method qualification program tests TRAC-B against experiments run in the FIST facility and extends the results to reactor system applications. With the completion and integration of these three activities, the objective of a best-estimate analysis capability has been achieved. (author)

  10. BWR Full Integral Simulation Test (FIST) Phase II test results and TRAC-BWR model qualification

    International Nuclear Information System (INIS)

    Sutherland, W.A.; Alamgir, M.; Findlay, J.A.; Hwang, W.S.

    1985-10-01

    Eight matrix tests were conducted in the FIST Phase I. These tests investigated the large break, small break and steamline break LOCA's, as well as natural circulation and power transients. There are nine tests in Phase II of the FIST program. They include the following LOCA tests: BWR/6 LPCI line break, BWR/6 intermediate size recirculation break, and a BWR/4 large break. Steady state natural circulation tests with feedwater makeup performed at high and low pressure, and at high pressure with HPCS makeup, are included. Simulation of a transient without rod insertion, and with controlled depressurization, was performed. Also included is a simulation of the Peach Bottom turbine trip test. The final two tests simulated a failure to maintain water level during a postulated accident. A FIST program objective is to assess the TRAC code by comparisons with test data. Two post-test predictions made with TRACB04 are compared with Phase II test data in this report. These are for the BWR/6 LPCI line break LOCA, and the Peach Bottom turbine trip test simulation

  11. BWR internals life assurance

    International Nuclear Information System (INIS)

    Herrera, M.L.; Stancavage, P.P.

    1988-01-01

    Boiling water reactor (BWR) internal components play an important role in power plant life extension. Many important internals were not designed for easy removal and changes in material properties and local environmental effects due to high radiation makes stress corrosion cracking more likely and more difficult to correct. Over the past several years, operating experience has shown that inspection, monitoring and refurbishment can be accomplished for internal structures with existing technology. In addition, mitigation techniques which address the causes of degradation are available to assure that life extension targets can be met. This paper describes the many considerations and aspects when evaluating life extension for reactor vessel internals

  12. Crud deposition modeling on BWR fuel rods

    International Nuclear Information System (INIS)

    Kucuk, Aylin; Cheng, Bo; Potts, Gerald A.; Shiralkar, Bharat; Morgan, Dave; Epperson, Kenny; Gose, Garry

    2014-01-01

    Deposition of boiling water reactor (BWR) system corrosion products (crud) on operating fuel rods has resulted in performance-limiting conditions in a number of plants. The operational impact of performance-limiting conditions involving crud deposition can be detrimental to a BWR operator, resulting in unplanned or increased frequency of fuel inspections, fuel failure and associated radiological consequences, operational restrictions including core power derate and/or forced shutdowns to remove failed fuel, premature discharge of individual bundles or entire reloads, and/or undesirable core design restrictions. To facilitate improved management of crud-related fuel performance risks, EPRI has developed the CORAL (Crud DepOsition Risk Assessment ModeL) tool. This paper presents a summary of the CORAL elements and benchmarking results. Applications of CORAL as a tool for fuel performance risk assessment are also discussed. (author)

  13. BWR condensate filtration studies

    International Nuclear Information System (INIS)

    Wilson, J.A.; Pasricha, A.; Rekart, T.E.

    1993-09-01

    Poor removal of particulate corrosion products (especially iron) from condensate is one of the major problems in BWR systems. The presence of activated corrosion products creates ''hot spots'' and increases piping dose rates. Also, fuel efficiency is reduced and the risk of fuel failure is increased by the deposit of corrosion products on the fuel. Because of these concerns, current EPRI guidelines call for a maximum of 2 ppb of iron in the reactor feedwater with a level of 0.5 ppb being especially desirable. It has become clear that conventional deep bed resins are incapable of meeting these levels. While installation of prefilter systems is an option, it would be more economical for plants with naked deep beds to find an improved bead resin for use in existing systems. BWR condensate filtration technologies are being tested on a condensate side stream at Hope Creek Nuclear Generating Station. After two years of testing, hollow fiber filters (HFF) and fiber matrix filters (FMF), and low crosslink cation resin, all provide acceptable results. The results are presented for pressure drop, filtration efficiency, and water quality measurements. The costs are compared for backwashable non-precoat HFF and FMF. Results are also presented for full deep bed vessel tests of the low crosslink cation resin

  14. BWR type nuclear reactors

    International Nuclear Information System (INIS)

    Yamamoto, Toru.

    1987-01-01

    Purpose: To obtain reactor core characteristics with less changes in the excess reactivity due to fuel burnup even when the operation period varies. Constitution: In a BWR type reactor where fuel assemblies containing fuel rods incorporated with burnable poisons are arranged, the fuel assemblies are grouped into first fuel assemblies and second fuel assemblies. Then, the number of fuel rods incorporated with burnable poisons within the first fuel assemblies is made greater than that of the second fuel rods, while the concentration of the burnable poisons in the fuel rods incorporated with the burnable poisons in the first fuel assemblies is made lower than that of the fuel rods incorporated with the burnable poisons in the second fuel assemblies. In the BWR type reactor constituted in this way, the reactor core characteristics can be improved by changing the ratio between the first fuel assemblies and the second fuel assemblies charged to the reactor core, thereby decreasing the changes in the burnup of the excess reactivity. (Kamimura, M.)

  15. EPRI BWR Water Chemistry Guidelines Revision

    International Nuclear Information System (INIS)

    Garcia, Susan E.; Giannelli, Joseph F.

    2014-01-01

    BWRVIP-190: BWR Water Chemistry Guidelines – 2008 Revision has been revised. The revision committee consisted of U.S. and non-U.S. utilities (members of the BWR Vessel and Internals Protection (BWRVIP) Mitigation Committee), reactor system manufacturers, fuel suppliers, and EPRI and industry experts. The revised document, BWRVIP-190 Revision 1, was completely reformatted into two volumes, with a simplified presentation of water chemistry control, diagnostic and good practice parameters in Volume 1 and the technical bases in Volume 2, to facilitate use. The revision was developed in parallel and in coordination with preparation of the Fuel Reliability Guidelines Revision 1: BWR Fuel Cladding Crud and Corrosion. Guidance is included for plants operating under normal water chemistry (NWC), moderate hydrogen water chemistry (HWC-M), and noble metal application (GE-Hitachi NobleChem™) plus hydrogen injection. Volume 1 includes significant changes to BWR feedwater and reactor water chemistry control parameters to provide increased assurance of intergranular stress corrosion cracking (IGSCC) mitigation of reactor materials and fuel reliability during all plant conditions, including cold shutdown (≤200°F (93°C)), startup/hot standby (>200°F (93°C) and ≤ 10%) and power operation (>10% power). Action Level values for chloride and sulfate have been tightened to minimize environmentally assisted cracking (EAC) of all wetted surfaces, including those not protected by hydrogen injection, with or without noble metals. Chemistry control guidance has been enhanced to minimize shutdown radiation fields by clarifying targets for depleted zinc oxide (DZO) injection while meeting requirements for fuel reliability. Improved tabular presentations of parameter values explicitly indicate levels at which actions are to be taken and required sampling frequencies. Volume 2 provides the technical bases for BWR water chemistry control for control of EAC, flow accelerated corrosion

  16. Interpretation of incore noise measurements in BWR's

    International Nuclear Information System (INIS)

    Dam, H. van

    1982-01-01

    A survey is given of the main incentives for power reactor noise research and the differences and similarities of noise in power and zero power systems are touched on. The basic characteristics of the adjoint method in reactor noise theory are treated. The detector adjoint functions describe the transfer functions between spatially distributed noise sources and a (neutron or gamma) detector. In particular, the spatial dependence of these functions explains the 'local' and 'global' effects in BWR noise measurements. By including thermal hydraulic feedback effects in the adjoint analysis, it is shown that the common idea of a dominant global effect at low frequencies which should result in point kinetic behaviour, is erroneous. The same analysis provides a method for nonperturbing on-line measurement of the reactor transfer function, which is demonstrated by results from measurements on a BWR in the Netherlands. In the final part of the paper some ideas are given for further research in the field of BWR noise. (author)

  17. Methyl Iodide Decomposition at BWR Conditions

    International Nuclear Information System (INIS)

    Pop, Mike; Bell, Merl

    2012-09-01

    Based on favourable results from short-term testing of methanol addition to an operating BWR plant, AREVA has performed numerous studies in support of necessary Engineering and Plant Safety Evaluations prior to extended injection of methanol. The current paper presents data from a study intended to provide further understanding of the decomposition of methyl iodide as it affects the assessment of methyl iodide formation with the application of methanol at BWR Plants. This paper describes the results of the decomposition testing under UV-C light at laboratory conditions and its effect on the subject methyl iodide production evaluation. The study as to the formation and decomposition of methyl iodide as it is effected by methanol addition is one phase of a larger AREVA effort to provide a generic plant Safety Evaluation prior to long-term methanol injection to an operating BWR. Other testing phases have investigated the compatibility of methanol with fuel construction materials, plant structural materials, plant consumable materials (i.e. elastomers and coatings), and ion exchange resins. Methyl iodide is known to be very unstable, typically preserved with copper metal or other stabilizing materials when produced and stored. It is even more unstable when exposed to light, heat, radiation, and water. Additionally, it is known that methyl iodide will decompose radiolytically, and that this effect may be simulated using ultra-violet radiation (UV-C) [2]. In the tests described in this paper, the use of a UV-C light source provides activation energy for the formation of methyl iodide. Thus is similar to the effect expected from Cherenkov radiation present in a reactor core after shutdown. Based on the testing described in this paper, it is concluded that injection of methanol at concentrations below 2.5 ppm in BWR applications to mitigate IGSCC of internals is inconsequential to the accident conditions postulated in the FSAR as they are related to methyl iodide formation

  18. BWR 90 and BWR 90+: Two advanced BWR design generations from ABB

    International Nuclear Information System (INIS)

    Haukeland, S.; Ivung, B.; Pedersen, T.

    1999-01-01

    ABB has two evolutionary advanced light water reactors available today - the BWR 90 boiling water reactor and the System 80+ pressurised water reactor. The BWR 90 is based on the design, construction, commissioning and operation of the BWR 75 plants. The operation experience of the six plants of this advanced design has been very good. The average annual energy availability is above 90%, and total power generation costs have been low. When developing the BWR 90 specific changes were introduced to a reference design, to adapt to technological progress, new safety requirements and to achieve cost savings. The thermal power rating of BWR 90 is 3800 MWth (providing a nominal 1374 MWe net), slightly higher than that of the reference plant ABB Atom has taken advantage of margins gained using a new generation of its SVEA fuel to attain this power rating without major design modifications. The BWR 90 design was completed and offered to the TVO utility in Finland in 1991, as one of the contenders for the fifth Finnish nuclear power plant project. Hence, the design is available today for deployment in new plant projects. Utility views were incorporated through co-operation with the Finnish utility TVO, owner and operator of the two Olkiluoto plants of BWR 75 design. A review against the European Utility Requirement (EUR) set of requirements has been performed, since the design, in 1997, was selected by the EUR Steering Committee to be the first BWR to be evaluated against the EUR documents. The review work was completed in 1998. It will be the subject of an 'EUR Volume 3 Subset for BWR 90' document. ABB is continuing its BWR development work with an 'evolutionary' design called BWR 90+, which aims at developing the BWR as a competitive option for the anticipated revival of the market for new nuclear plants beyond the turn of the century, as well as feeding ideas and inputs to the continuous modernisation efforts at operating plants. The development is performed by ABB Atom

  19. Utility experience with BWR-PSMS

    International Nuclear Information System (INIS)

    Bond, G.R.

    1986-01-01

    The BWR Power Shape Monitoring System (BWR-PSMS) has proven to be an effective and versatile tool for core monitoring. GPU Nuclear Corporation's (GPUN) Oyster Creek plant has been involved in the PSMS development since its inception, having been selected by EPRI as the initial demonstration site. Beginning with Cycle 10, Oyster Creek has been applying the BWR-PSMS as the primary core monitoring tool. Although the system has been in operation at Oyster Creek for the past several cycles, this is the first time the PSMS was used to monitor compliance to the plant technical specifications, to guide adherence to vendore fuel maneuvering recommendations and to develop data for certain performance records such as fuel burnup, isotopic accounting, etc. This paper will discuss the bases for the decision to apply PSMS as the fundamental core monitoring system, the experience in implementing the PSMS in this mode, activities currently underway or planned related to PSMS, and potential future extensions and applications of PSMS at Oyster Creek

  20. BWR fuel performance

    International Nuclear Information System (INIS)

    Baily, W.E.; Armijo, J.S.; Jacobson, J.; Proebstle, R.A.

    1979-01-01

    The General Electric experience base on BWR fuel includes over 29,000 fuel assemblies which contain 1,600,000 fuel rods. Over the last five years, design, process and operating changes have been introduced which have had major effects in improving fuel performance. Monitoring this fuel performance in BWRs has been accomplished through cooperative programs between GE and utilities. Activities such as plant fission product monitoring, fuel sipping and fuel and channel surveillance programs have jointly contributed to the value of this extensive experience base. The systematic evaluation of this data has established well-defined fuel performance trends which provide the assurance and confidence in fuel reliability that only actual operating experience can provide

  1. BWR type reactors

    International Nuclear Information System (INIS)

    Yano, Ryoichi; Sato, Takashi; Osaki, Masahiko; Hirayama, Fumio; Watabe, Atsushi.

    1980-01-01

    Purpose: To effectively eliminate radioactive substances released upon loss of coolant accidents in BWR type reactors. Constitution: A high pressure gas jetting device having a plurality of small aperture nozzles is provided above a spray nozzle, that is, at the top of a dry well. The jetting device is connected to a vacuum breaker provided in a pressure suppression chamber. Upon loss of coolant accident, coolants are sprayed from the spray nozzle and air or nitrogen is jetted from the gas jetting device as well. Then, the gases in the dry well are disturbed, whereby radioactive iodine at high concentration liable to be accumulated in the dry well is forced downwardly, dissolved in the spray water and eliminated. (Ikeda, J.)

  2. Burnup credit feasibility for BWR spent fuel shipments

    International Nuclear Information System (INIS)

    Broadhead, B.L.

    1990-01-01

    Considerable interest in the allowance of reactivity credit for the exposure history of power reactor fuel currently exists. This ''burnup credit'' issue has the potential to greatly reduce risk and cost when applied to the design and certification of spent of fuel casks used for transportation and storage. Analyses 1 have shown the feasibility estimated the risk and economic incentives for allowing burnup credit in pressurized water reactor (PWR) spent fuel shipping cask applications. This paper summarizes the extension of the previous PWR feasibility assessments to boiling water reactor (BWR) fuel. As with the PWR analysis, the purpose was not verification of burnup credit (see ref. 2 for ongoing work in this area) but a reasonable assessment of the feasibility and potential gains from its use in BWR applications. This feasibility analysis aims to apply simple methods that adequately characterize the time-dependent isotopic compositions of typical BWR fuel. An initial analysis objective was to identify a simple and reliable method for characterizing BWR spent fuel. The method includes characterization of a typical pin-cell spectrum, using a one-dimensional (1-D) model of a BWR assembly. The calculated spectrum allows burnup-dependent few-group material constants to be generated. Point depletion methods were then used to obtain the time-varying characteristics of the fuel. These simple methods were validated, where practical, with multidimensional methods. 6 refs., 1 tab

  3. BWR shutdown analyzer using artificial intelligence (AI) techniques

    International Nuclear Information System (INIS)

    Cain, D.G.

    1986-01-01

    A prototype alarm system for detecting abnormal reactor shutdowns based on artificial intelligence technology is described. The system incorporates knowledge about Boiling Water Reactor (BWR) plant design and component behavior, as well as knowledge required to distinguish normal, abnormal, and ATWS accident conditions. The system was developed using a software tool environment for creating knowledge-based applications on a LISP machine. To facilitate prototype implementation and evaluation, a casual simulation of BWR shutdown sequences was developed and interfaced with the alarm system. An intelligent graphics interface for execution and control is described. System performance considerations and general observations relating to artificial intelligence application to nuclear power plant problems are provided

  4. Seismic risk assessment of a BWR: status report

    International Nuclear Information System (INIS)

    Chuang, T.Y.; Bernreuter, D.L.; Wells, J.E.; Johnson, J.J.

    1985-02-01

    The seismic risk methodology developed in the US NRC Seismic Safety Margins Research Program (SSMRP) was demonstrated by its application to the Zion nuclear power plant, a pressurized water reactor (PWR). A detailed model of Zion, including systems analysis models (initiating events, event trees, and fault trees), SSI and structure models, and piping models was developed and analyzed. The SSMRP methodology can equally be applied to a boiling water reactor (BWR). To demonstrate its applicability, to identify fundamental differences in seismic risk between a PWR and a BWR, and to provide a basis of comparison of seismic risk between a PWR and a BWR when analyzed with comparable methodology and assumptions, a seismic risk analysis is being performed on the LaSalle County Station nuclear power plant

  5. Simplified compact containment BWR plant

    International Nuclear Information System (INIS)

    Heki, H.; Nakamaru, M.; Tsutagawa, M.; Hiraiwa, K.; Arai, K.; Hida, T.

    2004-01-01

    The reactor concept considered in this paper has a small power output, a compact containment and a simplified BWR configuration with comprehensive safety features. The Compact Containment Boiling Water Reactor (CCR), which is being developed with matured BWR technologies together with innovative systems/components, is expected to prove attractive in the world energy markets due to its flexibility in regard to both energy demands and site conditions, its high potential for reducing investment risk and its safety features facilitating public acceptance. The flexibility is achieved by CCR's small power output of 300 MWe class and capability of long operating cycle (refueling intervals). CCR is expected to be attractive from view point of investment due to its simplification/innovation in design such as natural circulation core cooling with the bottom located short core, internal upper entry control rod drives (CRDs) with ring-type dryers and simplified ECCS system with high pressure containment concept. The natural circulation core eliminates recirculation pumps and the maintenance of such pumps. The internal upper entry CRDs reduce the height of the reactor vessel (RPV) and consequently reduce the height of the primary containment vessel (PCV). The safety features mainly consist of large water inventory above the core without large penetration below the top of the core, passive cooling system by isolation condenser (IC), passive auto catalytic recombiner and in-vessel retention (IVR) capability. The large inventory increases the system response time in the case of design-base accidents, including loss of coolant accidents. The IC suppresses PCV pressure by steam condensation without any AC power. The recombiner decreases hydrogen concentration in the PCV in the case of a severe accident. Cooling the molten core inside the RPV if the core should be damaged by loss of core coolability could attain the IVR. The feasibility of CCR safety system has been confirmed by LOCA

  6. BWR type reactor core

    International Nuclear Information System (INIS)

    Tatemichi, Shin-ichiro.

    1981-01-01

    Purpose: To eliminate the variation in the power distribution of a BWR type reactor core in the axial direction even if the flow rate is increased or decreased by providing a difference in the void coefficient between the upper part and the lower parts of the reactor core, and increasing the void coefficient at the lower part of the reactor core. Constitution: The void coefficient of the lower region from the center to the lower part along the axial direction of a nuclear fuel assembly is increased to decrease the dependence on the flow rate of the axial power distribution of the nuclear fuel assembly. That is, a water/fuel ratio is varied, the water in non-boiled region is increased or the neutron spectrum is varied so as to vary the void coefficient. In order to exemplify it, the rate of the internal pellets of the fuel rod of the nuclear fuel assembly or the shape of the channel box is varied. Accordingly, the power does not considerably vary even if the flow rate is altered since the power is varied in the power operation. (Yoshihara, H.)

  7. BWR type reactor

    International Nuclear Information System (INIS)

    Okano, Shigeru.

    1992-01-01

    In a BWR type reactor, control rod drives are disposed in the upper portion of a reactor pressure vessel, and a control rod guide tube is disposed in adjacent with a gas/liquid separator at a same height, as well as a steam separator is disposed in the control rod guide tube. The length of a connection rod can be shortened by so much as the control rod guide tube and the gas/liquid separator overlapping with each other. Since the control rod guide tube and the gas/liquid separator are at the same height, the number of the gas/liquid separators to be disposed is decreased and, accordingly, even if the steam separation performance by the gas/liquid separator is lowered, it can be compensated by the steam separator of the control rod guide tube. In view of the above, since the direction of emergent insertion of the control rod is not against gravitational force but it is downward direction utilizing the gravitational force, reliability for the emergent insertion of the control rod can be further improved. Further, the length of the connection rod can be minimized, thereby enabling to lower the height of the reactor pressure vessel. The construction cost for the nuclear power plant can be reduced. (N.H.)

  8. Simplified distributed parameters BWR dynamic model for transient and stability analysis

    International Nuclear Information System (INIS)

    Espinosa-Paredes, Gilberto; Nunez-Carrera, Alejandro; Vazquez-Rodriguez, Alejandro

    2006-01-01

    This paper describes a simplified model to perform transient and linear stability analysis for a typical boiling water reactor (BWR). The simplified transient model was based in lumped and distributed parameters approximations, which includes vessel dome and the downcomer, recirculation loops, neutron process, fuel pin temperature distribution, lower and upper plenums reactor core and pressure and level controls. The stability was determined by studying the linearized versions of the equations representing the BWR system in the frequency domain. Numerical examples are used to illustrate the wide application of the simplified BWR model. We concluded that this simplified model describes properly the dynamic of a BWR and can be used for safety analysis or as a first approach in the design of an advanced BWR

  9. Limerick BWR turbine control and protection system upgrade success

    International Nuclear Information System (INIS)

    Tang, C.K.; Pietryka, T.S.; Federico, P.A.; Williams, J.C.

    2015-01-01

    Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented. (author)

  10. Limerick BWR turbine control and protection system upgrade success

    Energy Technology Data Exchange (ETDEWEB)

    Tang, C.K.; Pietryka, T.S.; Federico, P.A., E-mail: tangck@westinghouse.com, E-mail: pietryt@westinghouse, E-mail: federipa@westinghouse.com [Westinghouse Electric Company, LLC, Cranberry Township, PA (United States); Williams, J.C., E-mail: Jonathan.Williams@exeloncorp.com [Exelon Nuclear, Warrenville, IL (United States)

    2015-07-01

    Westinghouse and Exelon have successfully implemented a digital electro-hydraulic control (DEHC) at Limerick BWR Unit 1 Station to perform the turbine control, protection and reactor pressure functions. The DEHC replaces analog controls and addressed system performance, obsolescence and reliability. This was a first-of-a-kind application for control and protection of the main turbine and BWR pressure control for the distributed control system utilized. The demolition of analog equipment, main control room and front standard modifications, and acceptance testing were completed on schedule during the normal 2014 outage. Key aspects of the project that facilitated this success will be discussed and presented. (author)

  11. Call for applications_2013_VA_Final

    International Development Research Centre (IDRC) Digital Library (Canada)

    Lindsay Beck

    2013-04-12

    Apr 12, 2013 ... graduate level field-‐school, taught by UNBC and CoPEH-‐Canada team members1 . Final ... and most of the sessions in the course will be given in English. ... o demonstrated interest in Ecosystem approaches to health.

  12. Application opportunities in wireless communications. Final report

    International Nuclear Information System (INIS)

    Abbott, R.E.; Blevins, R.P.; Olmstead, C.

    1998-07-01

    This report presents the results of examinations of wireless technologies and applications that may offer potential to utilities. Five different wireless technology areas are reviewed. Three areas--Communication Networks, Monitored Security Services, and Home Automation--potentially represent new business ventures for utilities. Two areas--Automatic Vehicle Location and Automated Field-Force Management--represent wireless applications with potential for reduced operating costs and improved customer relations

  13. BWR Services maintenance training program

    International Nuclear Information System (INIS)

    Cox, J.H.; Chittenden, W.F.

    1979-01-01

    BWR Services has implemented a five-phase program to increase plant availability and capacity factor in operating BWR's. One phase of this program is establishing a maintenance training program on NSSS equipment; the scope encompasses maintenance on both mechanical equipment and electrical control and instrumentation equipment. The program utilizes actual product line equipment for practical Hands-on training. A total of 23 formal courses will be in place by the end of 1979. The General Electric Company is making a multimillion dollar investment in facilities to support this training. These facilities are described

  14. Application of fusion plasma technology. Final report

    International Nuclear Information System (INIS)

    Sabri, Z.A.

    1976-06-01

    This report presents principal findings of studies conducted at Iowa State on Applications of Fusion Plasma Technology. Two tasks were considered. The first was to identify and investigate plasma processes for near term industrial applications of already developed plasma technology. The second was to explore the potential of reprocessing the fuel for fusion test facilities in a closed-cycle system. For the first task, two applications were considered. One was alumina reduction in magnetically confined plasmas, and the other was uranium enrichment using plasma centrifuges. For the second task, in-core and ex-core plasma purification were considered. Separation techniques that are compatible with the plasma state were identified and preliminary analysis of their effectiveness were carried out. The effects of differential ionization of impurities on the separation effectiveness are considered. Possible technical difficulties in both tasks are identified and recommendations for future work are given

  15. The JAERI code system for evaluation of BWR ECCS performance

    International Nuclear Information System (INIS)

    Kohsaka, Atsuo; Akimoto, Masayuki; Asahi, Yoshiro; Abe, Kiyoharu; Muramatsu, Ken; Araya, Fumimasa; Sato, Kazuo

    1982-12-01

    Development of respective computer code system of BWR and PWR for evaluation of ECCS has been conducted since 1973 considering the differences of the reactor cooling system, core structure and ECCS. The first version of the BWR code system, of which developmental work started earlier than that of the PWR, has been completed. The BWR code system is designed to provide computational tools to analyze all phases of LOCAs and to evaluate the performance of the ECCS including an ''Evaluation Model (EM)'' feature in compliance with the requirements of the current Japanese Evaluation Guideline of ECCS. The BWR code system could be used for licensing purpose, i.e. for ECCS performance evaluation or audit calculations to cross-examine the methods and results of applicants or vendors. The BWR code system presented in this report comprises several computer codes, each of which analyzes a particular phase of a LOCA or a system blowdown depending on a range of LOCAs, i.e. large and small breaks in a variety of locations in the reactor system. The system includes ALARM-B1, HYDY-B1 and THYDE-B1 for analysis of the system blowdown for various break sizes, THYDE-B-REFLOOD for analysis of the reflood phase and SCORCH-B2 for the calculation of the fuel assembl hot plane temperature. When the multiple codes are used to analyze a broad range of LOCA as stated above, it is very important to evaluate the adequacy and consistency between the codes used to cover an entire break spectrum. The system consistency together with the system performance are discussed for a large commercial BWR. (author)

  16. Comparison of the General Electric BWR/6 standard plant design to the IAEA NUSS codes and guides

    International Nuclear Information System (INIS)

    D'Ardenne, W.H.; Sherwood, G.G.

    1985-01-01

    The General Electric BWR/6 Mark III standard plant design meets or exceeds current requirements of published International Atomic Energy Agency (IAEA) Nuclear Safety Standards (NUSS) codes and guides. This conclusion is based on a review of the NUSS codes and guides by General Electric and by the co-ordinated US review of the NUSS codes and guides during their development. General Electric compared the published IAEA NUSS codes and guides with the General Electric design. The applicability of each code and guide to the BWR/6 Mark III standard plant design was determined. Each code or guide was reviewed by a General Electric engineer knowledgeable about the structures, systems and components addressed and the technical area covered by that code or guide. The results of this review show that the BWR/6 Mark III standard plant design meets or exceeds the applicable requirements of the published IAEA NUSS codes and guides. The co-ordinated US review of the IAEA NUSS codes and guides corroborates the General Electric review. In the co-ordinated US review, the USNRC and US industry organizations (including General Electric) review the NUSS codes and guides during their development. This review ensures that the NUSS codes and guides are consistent with the current US government regulations, guidance and regulatory practices, US voluntary industry codes and standards, and accepted US industry design, construction and operational practices. If any inconsistencies are identified, comments are submitted to the IAEA by the USNRC. All US concerns submitted to the IAEA have been resolved. General Electric design reviews and the Final Design Approval (FDA) issued by the USNRC have verified that the General Electric BWR/6 Mark III standard plant design meets or exceeds the current US requirements, guidance and practices. Since these requirements, guidance and practices meet or exceed those of the NUSS codes and guides, so does the General Electric design. (author)

  17. Application of improved air transport data and wall transmission/reflection data in the SKYSINE code to typical BWR turbine skyshine

    Energy Technology Data Exchange (ETDEWEB)

    Tayama, Ryuichi; Hayashi, Katsumi [Hitachi Engineering Co. Ltd., Ibaraki (Japan); Hirayama, Hideo [High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan); Sakamoto, Yukio [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Harima, Yoshiko; Ishikawa, Satoshi [CRC Research Institute Inc., Tokyo (Japan); Hayashida, Yoshihisa [Toshiba Corp., Kawasaki, Kanagawa (Japan); Nemoto, Makoto [Visible Information Center, Tokai, Ibaraki (Japan); Sato, Osamu [Mitsubishi Research Inst., Inc., Tokyo (Japan)

    2000-03-01

    Three basic sets of data, i.e. air transport data and material transmission/reflection data, included in the SKYSHINE program have been improved using up-to-data and methods, and applied to skyshine dose calculations for a typical BWR turbine building. The direct and skyshine dose rates with the original SKYSHINE code show good agreements with MCNP Monte-Carlo calculations except for the distances less than 0.1 km. The results for the improved SKYSHINE code also have agreements with the MCNP code within 10-20%. The discrepancy of 10-20% can be due to the improved concrete transmission data at small incident and exit angles. We still improve the three sets of data and investigate with different calculational models to get more accurate results. (author)

  18. Application of the FFTBM method and the power relative contribution to the discharge transitory of the recirculation pumps of a BWR

    International Nuclear Information System (INIS)

    Castillo D, R.; Ortiz V, J.; Fuentes M, L.

    2013-10-01

    In this work was realized the simulation of the discharge transitory of both recirculation pumps of a BWR with the Simulate-3K code. This type of transitory is used in the stability analyses for the licensing of the fuel reload. An analysis of the precision of the simulation is also presented, using the FFTBM method jointly with the power relative contribution. This way, instead of determining the total precision of the calculation, a weighed precision is obtained by the contribution of each relevant parameter of the transitory. The results show that the precision of the simulation is acceptable due to the small magnitude of the merit figure of the width total average. The error in the merit figure comes mainly from the parameters total flow in the core and temperature of the fuel in the core. (Author)

  19. Seismic risk assessment of a BWR

    International Nuclear Information System (INIS)

    Wells, J.E.; Bernreuter, D.L.; Chen, J.C.; Lappa, D.A.; Chuang, T.Y.; Murray, R.C.; Johnson, J.J.

    1987-01-01

    The simplified seismic risk methodology developed in the USNRC Seismic Safety Margins Research Program (SSMRP) was demonstrated by its application to the Zion nuclear power plant (PWR). The simplified seismic risk methodology was developed to reduce the costs associated with a seismic risk analysis while providing adequate results. A detailed model of Zion, including systems analysis models (initiating events, event trees, and fault trees), SSI and structure models, and piping models, was developed and used in assessing the seismic risk of the Zion nuclear power plant (FSAR). The simplified seismic risk methodology was applied to the LaSalle County Station nuclear power plant, a BWR; to further demonstrate its applicability, and if possible, to provide a basis for comparing the seismic risk from PWRs and BWRs. (orig./HP)

  20. Improvement for BWR operator training

    International Nuclear Information System (INIS)

    Tsuchiya, Toshio; Masuda, Hisao; Isono, Tomoyuki; Noji, Kunio; Togo, Toshiki

    1989-01-01

    BWR Operator Training Center Corporation (BTC) was established in April 1971 for the purpose of training the operators from all BWR utilities in Japan. Since April 1974, more than 2600 operators and 1000 shift teams have been trained with the full-scope simulators in BTC up to the end of March 1988. To get the satisfactory results of the training, BTC has been making every effort to improve the facilities, the training materials, the instruction methods and the curricula. In this paper, such a series of recent improvements in the instruction methods and the curricula are presented that are effective to expand the knowledge and to improve the skills of middle or senior class operators. (author)

  1. Synergistic failure of BWR internals

    International Nuclear Information System (INIS)

    Ware, A. G.; Chang, T.Y.

    1999-01-01

    Boiling Water Reactor (BWR) core shrouds and other reactor internals important to safety are experiencing intergranular stress corrosion cracking (IGSCC). The United States Nuclear Regulatory Commission has followed the problem, and as part of its investigations, contracted with the Idaho National Engineering and Environmental Laboratory to conduct a risk assessment. The overall project objective is to assess the potential consequences and risks associated with the failure of IGSCC-susceptible BWR vessel internals, with specific consideration given to potential cascading and common mode effects. An initial phase has been completed in which background material was gathered and evaluated, and potential accident sequences were identified. A second phase is underway to perform a simplified, quantitative probabilistic risk assessment on a representative high-power BWR/4. Results of the initial study conducted on the jet pumps show that any cascading failures would not result in a significant increase in the core damage frequency. The methodology is currently being extended to other major reactor internals components

  2. BWR control blade replacement strategies

    Energy Technology Data Exchange (ETDEWEB)

    Kennard, M W [Stoller Nuclear Fuel, NAC International, Pleasantville, NY (United States); Harbottle, J E [Stoller Nuclear Fuel, NAC International, Thornbury, Bristol (United Kingdom)

    2000-02-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B{sub 4}C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  3. BWR control blade replacement strategies

    International Nuclear Information System (INIS)

    Kennard, M.W.; Harbottle, J.E.

    2000-01-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B 4 C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  4. Development of next BWR plant

    International Nuclear Information System (INIS)

    Moriya, Kumiaki; Tanikawa, Naoshi; Kinoshita, Shoichiro; Utena, Shunsuke

    1995-01-01

    It is expected that BWR power generation will be main nuclear power generation for long period hereafter, and in the ABWRs being constructed at present, the safety, reliability, operation performance, economical efficiency and so on are further heightend as compared with conventional BWRs. On the other hand, in order to cope with future social change, the move to develop the next reactor type following ABWRs was begun already by the cooperation of electirc power companies and plant manufacturers. Hitachi Ltd. has advanced eagerly the development of new light water reactors. Also the objective of BWR power generation hereafter is to heighten the safety, reliability, operation performance and economical efficiency, and the development has been advanced, aiming at bearing the main roles of nuclear power generation. At present, ABWRs are under construction as No. 6 and 7 plants in Kashiwazaki Kariwa Nuclear Power Station, Tokyo Electric Power Co., Inc. In order to let ABWRs take root, the further improvement of economy by the standardization, the rationalization by revising the specification and the improvement of machinery and equipment is necessary. As the needs of the development of next generation BWRs, the increase of power output, the heightening of safety and economical efficiency are discussed. The concept of the next generation BWR plant aiming at the start of operation around 2010 is shown. (K.I.)

  5. Development of next BWR plant

    Energy Technology Data Exchange (ETDEWEB)

    Moriya, Kumiaki; Tanikawa, Naoshi; Kinoshita, Shoichiro; Utena, Shunsuke [Hitachi Ltd., Ibaraki (Japan). Hitachi Works

    1995-04-01

    It is expected that BWR power generation will be main nuclear power generation for long period hereafter, and in the ABWRs being constructed at present, the safety, reliability, operation performance, economical efficiency and so on are further heightend as compared with conventional BWRs. On the other hand, in order to cope with future social change, the move to develop the next reactor type following ABWRs was begun already by the cooperation of electirc power companies and plant manufacturers. Hitachi Ltd. has advanced eagerly the development of new light water reactors. Also the objective of BWR power generation hereafter is to heighten the safety, reliability, operation performance and economical efficiency, and the development has been advanced, aiming at bearing the main roles of nuclear power generation. At present, ABWRs are under construction as No. 6 and 7 plants in Kashiwazaki Kariwa Nuclear Power Station, Tokyo Electric Power Co., Inc. In order to let ABWRs take root, the further improvement of economy by the standardization, the rationalization by revising the specification and the improvement of machinery and equipment is necessary. As the needs of the development of next generation BWRs, the increase of power output, the heightening of safety and economical efficiency are discussed. The concept of the next generation BWR plant aiming at the start of operation around 2010 is shown. (K.I.).

  6. Assessment of the Prony's method for BWR stability analysis

    International Nuclear Information System (INIS)

    Ortiz-Villafuerte, Javier; Castillo-Duran, Rogelio; Palacios-Hernandez, Javier C.

    2011-01-01

    Highlights: → This paper describes a method to determine the degree of stability of a BWR. → Performance comparison between Prony's and common AR techniques is presented. → Benchmark data and actual BWR transient data are used for comparison. → DR and f results are presented and discussed. → The Prony's method is shown to be a robust technique for BWR stability. - Abstract: It is known that Boiling Water Reactors are susceptible to present power oscillations in regions of high power and low coolant flow, in the power-flow operational map. It is possible to fall in one of such instability regions during reactor startup, since both power and coolant flow are being increased but not proportionally. One other possibility for falling into those areas is the occurrence of a trip of recirculation pumps. Stability monitoring in such cases can be difficult, because the amount or quality of power signal data required for calculation of the stability key parameters may not be enough to provide reliable results in an adequate time range. In this work, the Prony's Method is presented as one complementary alternative to determine the degree of stability of a BWR, through time series data. This analysis method can provide information about decay ratio and oscillation frequency from power signals obtained during transient events. However, so far not many applications in Boiling Water Reactors operation have been reported and supported to establish the scope of using such analysis for actual transient events. This work presents first a comparison of decay ratio and frequency oscillation results obtained by Prony's method and those results obtained by the participants of the Forsmark 1 and 2 Boiling Water Reactor Stability Benchmark using diverse techniques. Then, a comparison of decay ratio and frequency oscillation results is performed for four real BWR transient event data, using Prony's method and two other techniques based on an autoregressive modeling. The four

  7. Development of long operating cycle simplified BWR

    International Nuclear Information System (INIS)

    Heki, H.; Nakamaru, M.; Maruya, T.; Hiraiwa, K.; Arai, K.; Narabayash, T.; Aritomi, M.

    2002-01-01

    This paper describes an innovative plant concept for long operating cycle simplified BWR (LSBWR) In this plant concept, 1) Long operating cycle ( 3 to 15 years), 2) Simplified systems and building, 3) Factory fabrication in module are discussed. Designing long operating core is based on medium enriched U-235 with burnable poison. Simplified systems and building are realized by using natural circulation with bottom located core, internal CRD and PCV with passive system and an integrated reactor and turbine building. This LSBWR concept will have make high degree of safety by IVR (In Vessel Retention) capability, large water inventory above the core region and no PCV vent to the environment due to PCCS (Passive Containment Cooling System) and internal vent tank. Integrated building concept could realize highly modular arrangement in hull structure (ship frame structure), ease of seismic isolation capability and high applicability of standardization and factory fabrication. (authors)

  8. BWR plant advanced central control panel PODIA

    International Nuclear Information System (INIS)

    Fujii, K.; Hayakawa, H.; Ikeda, Y.; Neda, T.; Suto, O.; Takamiya, S.

    1983-01-01

    BWR plant central control panels have become more and more enlarged and complicated recently due to the magnification of the scale of a plant and the requirement to reinforce safety. So, it is important to make communication between men and the complicated central control panel smooth. Toshiba has developed an advanced central control panel, named PODIA, which uses many computers and color CRTs, and PODIA is now in the stage of application to practical plants. In this article, the writers first touch upon control functions transition in the central control room, the PODIA position concerning the world-wide trend in this technology phase and the human engineering on the design. Then they present concrete design concepts for the control board and computer system which constitute PODIA

  9. A practical methodology of radiological protection for the reduction of hot particles in BWR type reactors

    International Nuclear Information System (INIS)

    Alvarez G, G.

    1991-01-01

    The purpose of this work, in general form, is to describe a practical method for reduction of hot particles generated as consequence of the operational activities of BWR nuclear reactors. This methodology provides a description of the localizations and/or probable activities of finding particles highly radioactive denominated hot particles. For this purpose it was developed a strategy based on the decontamination lineaments, as well as the manipulation, gathering, registration, contention, documentation, control and final disposition of the hot particles. In addition, some recommendations are reiterated and alternative, in order to gathering the hot particles in a dynamic way given to the activities of the personal occupationally exposed in highly radioactive areas. The structure of the methodology of hot particles is supported in the radiological controls based on the Code of Federal Regulation 10 CFR 20 as well as the applicable regulatory documents. It provides an idea based on administrative controls of radiological protection, in order to suggesting the responsibilities and necessary directing for the control of the hot particles required in nuclear plants of the BWR type. (author)

  10. Specifications of the BWR simulator for HAMMLAB 2000

    International Nuclear Information System (INIS)

    Grini, Rolf-Einar; Miettinen, Jaakko; Nurmilaukas, Pekka; Raussi; Pekka; Saarni, Ray; Stokke; Egil; Soerensen, Aimar; Tiihonen, Olli

    1998-02-01

    The Boiling Water Reactor (BWR) simulator for HAMMLAB 2000 will be a model of the Swedish plant Forsmark-3. This report gives the specifications of the BWR simulator. The bulk of the report is a copy of the relevant addendum to the contract with the developer, and to the contract with the group of utilities and with ABB Atom. After a general overview, each plant system is described one after the other (using the reference plant system coding), and the simulation of each system is specified. Even the systems that shall not be simulated are included; in those cases the specification is: It is not required that ... is simulated. A list of malfunctions is given, as well as a list of validation transients. Finally the operator interface is specified. (author)

  11. Paired replacement fuel assemblies for BWR-type reactor

    International Nuclear Information System (INIS)

    Oguchi, Kazushige.

    1997-01-01

    There are disposed a large-diameter water rod constituting a non-boiling region at a central portion and paired replacement fuel assemblies for two streams having the same average enrichment degree and different amount of burnable poisons. The paired replacement fuel assemblies comprise a first fuel assembly having a less amount of burnable poisons and a second fuel assembly having a larger amount of burnable poisons. A number of burnable poison-containing fuel rods in adjacent with the large diameter water rod is increased in the second fuel assembly than the first fuel assembly. Then, the poison of the paired replacement fuel assemblies for the BWR type reactor can be annihilated simultaneously at the final stage of the cycle. Accordingly, fuels for a BWR type reactor excellent in economical property and safety and facilitating the design of the replacement reactor core can be obtained. (N.H.)

  12. BWR Steam Dryer Alternating Stress Assessment Procedures

    Energy Technology Data Exchange (ETDEWEB)

    Morante, R. J. [Brookhaven National Lab. (BNL), Upton, NY (United States); Hambric, S. A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ziada, S. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-12-01

    This report presents an overview of Boiling Water Reactor (BWR) steam dryer design; the fatigue cracking failures that occurred at the Quad Cities (QC) plants and their root causes; a history of BWR Extended Power Uprates (EPUs) in the USA; and a discussion of steam dryer modifications/replacements, alternating stress mechanisms on steam dryers, and structural integrity evaluations (static and alternating stress).

  13. BWR NSSS design basis documentation

    International Nuclear Information System (INIS)

    Vij, R.S.; Bates, R.E.

    2004-01-01

    programs that GE has participated in and describes the different options and approaches that have been used by various utilities in their design basis programs. Some of these variations deal with the scope and depth of coverage of the information, while others are related to the process (how the work is done). Both of these topics can have a significant effect on the program cost. Some insight into these effects is provided. The final section of the paper presents a set of lessons learned and a recommendation for an optimum approach to a design basis information program. The lessons learned reflect the knowledge that GE has gained by participating in design basis programs with nineteen domestic and international BWR owner/operators. The optimum approach described in this paper is GE's attempt to define a set of information and a work process for a utility/GE NSSS Design Basis Information program that will maximize the cost effectiveness of the program for the utility. (author)

  14. Power oscillations in BWR reactors

    International Nuclear Information System (INIS)

    Espinosa P, G.

    2002-01-01

    One of the main problems in the operation of BWR type reactors is the instability in power that these could present. One type of oscillations and that is the objective of this work is the named density wave, which is attributed to the thermohydraulic processes that take place in the reactor core. From the beginnings of the development of BWR reactors, the stability of these has been an important aspect in their design, due to its possible consequences on the fuel integrity. The reactor core operates in two phase flow conditions and it is observed that under certain power and flow conditions, power instabilities appear. Studying this type of phenomena is complex, due to that a reactor core is constituted approximately by 27,000 fuel bars with different distributions of power and flow. The phenomena that cause the instability in BWR reactors continue being matter of scientific study. In the literature mainly in nuclear subject, it can be observed that exist different methods and approximations for studying this type of phenomena, nevertheless, their results are focused to establish safety limits in the reactor operation, instead of studying in depth of the knowledge about. Also in this line sense of the reactor data analysis, the oscillations characteristic frequencies are obtained for trying to establish if the power is growing or decreasing. In addition to that before mentioned in this paper it is presented a rigorous study applying the volumetric average method, for obtaining the vacuum waves propagation velocities and its possible connection with the power oscillations. (Author)

  15. 15 CFR 301.7 - Final disposition of an application.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Final disposition of an application. 301.7 Section 301.7 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE MISCELLANEOUS REGULATIONS INSTRUMENTS...

  16. Final report: Compiled MPI. Cost-Effective Exascale Application Development

    Energy Technology Data Exchange (ETDEWEB)

    Gropp, William Douglas [Univ. of Illinois, Urbana-Champaign, IL (United States)

    2015-12-21

    This is the final report on Compiled MPI: Cost-Effective Exascale Application Development, and summarizes the results under this project. The project investigated runtime enviroments that improve the performance of MPI (Message-Passing Interface) programs; work at Illinois in the last period of this project looked at optimizing data access optimizations expressed with MPI datatypes.

  17. BWR alloy 182 stress Corrosion Cracking Experience

    International Nuclear Information System (INIS)

    Horn, R.M.; Hickling, J.

    2002-01-01

    Modern Boiling Water Reactors (BWR) have successfully operated for more than three decades. Over that time frame, different materials issues have continued to arise, leading to comprehensive efforts to understand the root cause while concurrently developing different mitigation strategies to address near-term, continued operation, as well as provide long-term paths to extended plant life. These activities have led to methods to inspect components to quantify the extent of degradation, appropriate methods of analysis to quantify structural margin, repair designs (or strategies to replace the component function) and improved materials for current and future application. The primary materials issue has been the occurrence of stress corrosion cracking (SCC). While this phenomenon has been primarily associated with austenitic stainless steel, it has also been found in nickel-base weldments used to join piping and reactor internal components to the reactor pressure vessel consistent with fabrication practices throughout the nuclear industry. The objective of this paper is to focus on the history and learning gained regarding Alloy 182 weld metal. The paper will discuss the chronology of weld metal cracking in piping components as well as in reactor internal components. The BWR industry has pro-actively developed inspection processes and procedures that have been successfully used to interrogate different locations for the existence of cracking. The recognition of the potential for cracking has also led to extensive studies to understand cracking behavior. Among other things, work has been performed to characterize crack growth rates in both oxygenated and hydrogenated environments. The latter may also be relevant to PWR systems. These data, along with the understanding of stress corrosion cracking processes, have led to extensive implementation of appropriate mitigation measures. (authors)

  18. BWR startup and shutdown activity transport control

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, S.E., E-mail: sgarcia@epri.com [Electric Power Research Inst. (EPRI), Palo Alto, California (United States); Giannelli, J.F.; Jarvis, A.J., E-mail: jgiannelli@finetech.com, E-mail: ajarvis@finetech.com [Finetech, Inc., Parsippany, New Jersey (United States)

    2010-07-01

    This paper summarizes BWR industry experience on good practices for controlling the transport of corrosion product activity during shutdowns, particularly refueling outages, and for startup chemistry control to minimize IGSCC (intergranular stress corrosion cracking). For shutdown, overall goals are to minimize adverse impacts of crud bursts and the time required to remove activated corrosion products from the reactor coolant during the shutdown process prior to refueling, and to assist plants in predicting and controlling radiation exposure during outages. For startup, the overall goals are to highlight conditions during early heatup and startup when sources of reactor coolant oxidants are high, when there is a greater likelihood for chemical excursions associated with refueling outage work activities, and when hydrogen injection is not available to mitigate IGSCC due to system design limitations. BWR water chemistry has changed significantly in recent years with the adoption of hydrogen water chemistry, zinc addition and noble metal chemical applications. These processes have, in some instances, resulted in significant activity increases during shutdown evolutions, which together with reduced time for cleanup because of shorter outages, has consequently increased outage radiation exposure. A review several recent outages shows that adverse effects from these conditions can be minimized, leading to the set of good practice recommendations for shutdown chemistry control. Most plants lose the majority of their hydrogen availability hours during early startup because feedwater hydrogen injection systems were not originally designed to inject hydrogen below 20% power. Hydrogen availability has improved through modifications to inject hydrogen at lower power levels, some near 5%. However, data indicate that IGSCC is accelerated during early startup, when dissolved oxygen and hydrogen peroxide levels are high and reactor coolant temperatures are in the 300 to 400 {sup o

  19. Reliable estimation of neutron flux in BWR reactor vessel using the tort code (2) application to neutron and gamma flux estimation

    Energy Technology Data Exchange (ETDEWEB)

    Kurosawa, M. [Toshiba Corp., Yokohama (Japan); Tsukiyama, T.; Hayashi, K. [Hitachi Engineering Co. Ltd., Hitachi-shi (Japan)

    2001-07-01

    A neutron and gamma flux distribution around the core of BWR commercial plant in Japan was calculated, using a three-dimensional transport code, TORT in DOORS32 code system. In the external of the core, the bottom of the model was at an elevation of 150 cm below the bottom of active fuel, the top of the model was at an elevation of the top of the shroud head dome and the radial part of the model was to the outside of the reactor pressure vessel. The top guide beams were modeled explicitly to obtain the neutron and gamma flux distribution both in the beams and outside beams. The each control rod guide tube was also modeled with homogeneous region which included the blade wing and poison tubes so that we could obtain the neutron and gamma flux distribution around the each control rod guide tube. The calculation model mentioned above needed very large memory size which exceeded a few decade giga-bytes. As the using the splicing/coupling method had uncertainly at the splicing/coupling boundary, in this work the calculation was performed without this splicing/coupling method. On the other hand, radioactivity data were measured for a few pieces of the top guide beam, shroud and in-core monitor guide tube in the same plant which was analyzed in the above calculation. So the calculation results were able to be compared with those measured data as benchmarking and at the end of this task, the C/M values at these measured points were obtained and calculation model using TORT was evaluated. (authors)

  20. Axial profiles of burned and fraction of holes for calculations of criticality with credit for BWR fuel burning; Perfiles axiales de quemado y fraccion de huecos para calculos de criticidad con credito al quemado para combustible BWR

    Energy Technology Data Exchange (ETDEWEB)

    Casado Sanchez, C.; Rubio Oviedo, P.

    2014-07-01

    This paper presents a method to define surround profiles of burning and fraction of holes suited for use in applications of credit to burning of BWR fuel from results obtained with the module STARBUCS of SCALE. (Author)

  1. Condensate polishing guidelines for PWR and BWR plants

    International Nuclear Information System (INIS)

    Robbins, P.; Crinigan, P.; Graham, B.; Kohlmann, R.; Crosby, C.; Seager, J.; Bosold, R.; Gillen, J.; Kristensen, J.; McKeen, A.; Jones, V.; Sawochka, S.; Siegwarth, D.; Keeling, D.; Polidoroff, T.; Morgan, D.; Rickertsen, D.; Dyson, A.; Mills, W.; Coleman, L.

    1993-03-01

    Under EPRI sponsorship, an industry committee, similar in form and operation to other guideline committees, was created to develop Condensate Polishing Guidelines for both PWR and BWR systems. The committee reviewed the available utility and water treatment industry experience on system design and performance and incorporated operational and state-of-the-art information into document. These guidelines help utilities to optimize present condensate polisher designs as well as be a resource for retrofits or new construction. These guidelines present information that has not previously been presented in any consensus industry document. The committee generated guidelines that cover both deep bed and powdered resin systems as an integral part of the chemistry of PWR and BWR plants. The guidelines are separated into sections that deal with the basis for condensate polishing, system design, resin design and application, data management and performance and management responsibilities

  2. Axial profiles of burned and fraction of holes for calculations of criticality with credit for BWR fuel burning

    International Nuclear Information System (INIS)

    Casado Sanchez, C.; Rubio Oviedo, P.

    2014-01-01

    This paper presents a method to define surround profiles of burning and fraction of holes suited for use in applications of credit to burning of BWR fuel from results obtained with the module STARBUCS of SCALE. (Author)

  3. BWR water chemistry impurity studies

    International Nuclear Information System (INIS)

    Ljungberg, L.G.; Korhonen, S.; Renstroem, K.; Hofling, C.G.; Rebensdorff, B.

    1990-03-01

    Laboratory studies were made on the effect of water impurities on environmental cracking in simulated BWR water of stainless steel, low alloy steel and nickel-base alloys. Constant elongation rate tensile (CERT) tests were run in simulated normal water chemistry (NWC), hydrogen water chemistry (HWC), or start-up environment. Sulfate, chloride and copper with chloride added to the water at levels of a fraction of a ppM were found to be extremely deleterious to all kinds of materials except Type 316 NG. Other detrimental impurities were fluoride, silica and some organic acids, although acetic acid was beneficial. Nitrate and carbon dioxide were fairly inoccuous. Corrosion fatigue and constant load tests on compact tension specimens were run in simulated normal BWR water chemistry (NWC) or hydrogen water chemistry (HWC), without impurities or with added sulfate or carbon dioxide. For sensitized Type 304 SS in NWC, 0.1 ppM sulfate increased crack propagation rates in constant load tests by up to a factor of 100, and in fatigue tests up to a factor of 10. Also, cracking in Type 316 nuclear grade SS and Alloy 600 was enhanced, but to a smaller degree. Carbon dioxide was less detrimental than sulfate. 3 figs., 4 tabs

  4. BWR core melt progression phenomena: Experimental analyses

    International Nuclear Information System (INIS)

    Ott, L.J.

    1992-01-01

    In the BWR Core Melt in Progression Phenomena Program, experimental results concerning severe fuel damage and core melt progression in BWR core geometry are used to evaluate existing models of the governing phenomena. These include control blade eutectic liquefaction and the subsequent relocation and attack on the channel box structure; oxidation heating and hydrogen generation; Zircaloy melting and relocation; and the continuing oxidation of zirconium with metallic blockage formation. Integral data have been obtained from the BWR DF-4 experiment in the ACRR and from BWR tests in the German CORA exreactor fuel-damage test facility. Additional integral data will be obtained from new CORA BWR test, the full-length FLHT-6 BWR test in the NRU test reactor, and the new program of exreactor experiments at Sandia National Laboratories (SNL) on metallic melt relocation and blockage formation. an essential part of this activity is interpretation and use of the results of the BWR tests. The Oak Ridge National Laboratory (ORNL) has developed experiment-specific models for analysis of the BWR experiments; to date, these models have permitted far more precise analyses of the conditions in these experiments than has previously been available. These analyses have provided a basis for more accurate interpretation of the phenomena that the experiments are intended to investigate. The results of posttest analyses of BWR experiments are discussed and significant findings from these analyses are explained. The ORNL control blade/canister models with materials interaction, relocation and blockage models are currently being implemented in SCDAP/RELAP5 as an optional structural component

  5. An A BWR demonstration simulator for training and developing technical staff

    International Nuclear Information System (INIS)

    Powers, J.; Yonezawa, H.; Aoyagi, Y.; Kataoka, K.

    2015-09-01

    The US-Advanced Boiling Water Reactor (A BWR), certified by the US NRC, is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. Toshiba has developed a Demonstration Simulator of the A BWR control room that provides a realistic experience for training and education on BWR principles and operations fundamentals. The Demonstration Simulator is located in the Toshiba America Nuclear Energy (Tane) office in Charlotte, North Carolina and is composed of standard office computer equipment set up in a specific arrangement that is representative of the layout of an A BWR control room. The Demonstration Simulator is not intended for licensed operator training, but can provide a framework for encouraging entry level technically oriented nuclear workers to enter the operations field; strengthening the linkage between university energy field curricula and real-life application of theory; and, improving understanding of integrated plant operations for developing station technical staff. This paper describes the A BWR Demonstration Simulator and its applications for training and educating future nuclear workers. (Author)

  6. An A BWR demonstration simulator for training and developing technical staff

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Yonezawa, H.; Aoyagi, Y.; Kataoka, K., E-mail: jim.powers@toshiba.com [Toshiba Corporation, Kawasaki, Kanagawa (Japan)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the US NRC, is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. Toshiba has developed a Demonstration Simulator of the A BWR control room that provides a realistic experience for training and education on BWR principles and operations fundamentals. The Demonstration Simulator is located in the Toshiba America Nuclear Energy (Tane) office in Charlotte, North Carolina and is composed of standard office computer equipment set up in a specific arrangement that is representative of the layout of an A BWR control room. The Demonstration Simulator is not intended for licensed operator training, but can provide a framework for encouraging entry level technically oriented nuclear workers to enter the operations field; strengthening the linkage between university energy field curricula and real-life application of theory; and, improving understanding of integrated plant operations for developing station technical staff. This paper describes the A BWR Demonstration Simulator and its applications for training and educating future nuclear workers. (Author)

  7. AREVA solutions to licensing challenges in PWR and BWR reload and safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Curca-Tivig, Florin [AREVA GmbH, Erlangen (Germany)

    2016-05-15

    Regulatory requirements for reload and safety analyses are evolving: new safety criteria, request for enlarged qualification databases, statistical applications, uncertainty propagation.. In order to address these challenges and access more predictable licensing processes, AVERA is implementing consistent code and methodology suites for PWR and BWR core design and safety analysis, based on first principles modeling and extremely broad verification and validation data base. Thanks to the high computational power increase in the last decades methods' development and application now include new capabilities. An overview of the main AREVA codes and methods developments is given covering PWR and BWR applications in different licensing environments.

  8. Reduction of radiation exposure in Japanese BWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Morikawa, Yoshitake

    1995-01-01

    The reduction of occupational exposure to radiation during the annual inspection and maintenance outages of Japanese boiling water reactors (BWR) is one of the most important objectives for stable and reliable operation. It was shown that this radiation exposure is caused by radionuclides, such as Co-60, Co-58 and Mn-54 which are produced from the metal elements Co, Ni, and Fe present in the corrosion products of structural materials that had been irradiated by neutrons. Therefore, to reduce radiation sources and exposures in Japanese BWRs, attempts have been reinforced to remove corrosion products and activated corrosion products from the primary coolant system. This paper describes the progress of the application of these measures to Japanese BWRs. Most Japanese BWR-4 and BWR-5 type nuclear power plants started their commercial operations during the 1970s. With the elapse of time during operations, a problem came to the forefront, namely that occupational radiation exposure during plant outages gradually increased, which obstructed the smooth running of inspections and maintenance work. To overcome this problem, extensive studies to derive effective countermeasures for radiation exposure reduction were undertaken, based on the evaluation of the plants operation data

  9. Reduction of radiation exposure in Japanese BWR Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Morikawa, Yoshitake [ISOGO Nuclear Engineering Center, Yokohama (Japan)

    1995-03-01

    The reduction of occupational exposure to radiation during the annual inspection and maintenance outages of Japanese boiling water reactors (BWR) is one of the most important objectives for stable and reliable operation. It was shown that this radiation exposure is caused by radionuclides, such as Co-60, Co-58 and Mn-54 which are produced from the metal elements Co, Ni, and Fe present in the corrosion products of structural materials that had been irradiated by neutrons. Therefore, to reduce radiation sources and exposures in Japanese BWRs, attempts have been reinforced to remove corrosion products and activated corrosion products from the primary coolant system. This paper describes the progress of the application of these measures to Japanese BWRs. Most Japanese BWR-4 and BWR-5 type nuclear power plants started their commercial operations during the 1970s. With the elapse of time during operations, a problem came to the forefront, namely that occupational radiation exposure during plant outages gradually increased, which obstructed the smooth running of inspections and maintenance work. To overcome this problem, extensive studies to derive effective countermeasures for radiation exposure reduction were undertaken, based on the evaluation of the plants operation data.

  10. BWR chemistry control status: a summary of industry chemistry status relative to the BWR water chemistry guidelines

    International Nuclear Information System (INIS)

    Garcia, S.E.; Giannelli, J.F.; Jarvis, M.L.

    2010-01-01

    The EPRI Boiling Water Reactor (BWR) Water Chemistry Guidelines were revised and issued in October 2008. The 2008 Revision of the Guidelines continues to focus on intergranular stress corrosion cracking (IGSCC), which can limit the service life of susceptible materials and components exposed to water chemistry environments. The 2008 Revision also places increased emphasis on fuel performance and meeting the industry goal of zero fuel failures by 2010. As an industry consensus document, the Guidelines were created to provide proactive water chemistry control strategies for mitigating IGSCC, maintaining fuel integrity and controlling radiation fields. The Guidelines provide a technically-based framework for an effective BWR water chemistry program. This paper provides an overview of industry experience relative to the Guidelines. Over the past few years, many BWR units have implemented noble metal chemical application technologies either during plant hot or cold shutdown or at normal power operating conditions. This paper explores plant experience with optimized water chemistry, implementation of various additive chemistries such as noble metal application and zinc addition, and compliance with the Guidelines recommendations. Depleted zinc oxide addition has been broadly applied across the BWR fleet since the 1980s. The guidance for zinc addition has been revised in the Guidelines to reflect concerns with fuel performance. While zinc addition is a successful method for shutdown dose rate control, concerns still exist for high zinc deposition on fuel surfaces, especially when feedwater iron is elevated and as fuel cores are being driven to provide maximum power output over longer fuel cycles. Recent plant experience has shown that the utilization of online noble metal application and continued zinc addition may provide additional benefits for radiation control. Dose rate experiences at plants utilizing the online noble metal application technology and zinc addition

  11. BWR chemistry control status: a summary of industry chemistry status relative to the BWR water chemistry guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, S.E., E-mail: sgarcia@epri.com [Electric Power Research Inst. (EPRI), Palo Alto, California (United States); Giannelli, J.F.; Jarvis, M.L., E-mail: jgiannelli@finetech.com [Finetech, Inc., Parsippany, NJ (United States)

    2010-07-01

    The EPRI Boiling Water Reactor (BWR) Water Chemistry Guidelines were revised and issued in October 2008. The 2008 Revision of the Guidelines continues to focus on intergranular stress corrosion cracking (IGSCC), which can limit the service life of susceptible materials and components exposed to water chemistry environments. The 2008 Revision also places increased emphasis on fuel performance and meeting the industry goal of zero fuel failures by 2010. As an industry consensus document, the Guidelines were created to provide proactive water chemistry control strategies for mitigating IGSCC, maintaining fuel integrity and controlling radiation fields. The Guidelines provide a technically-based framework for an effective BWR water chemistry program. This paper provides an overview of industry experience relative to the Guidelines. Over the past few years, many BWR units have implemented noble metal chemical application technologies either during plant hot or cold shutdown or at normal power operating conditions. This paper explores plant experience with optimized water chemistry, implementation of various additive chemistries such as noble metal application and zinc addition, and compliance with the Guidelines recommendations. Depleted zinc oxide addition has been broadly applied across the BWR fleet since the 1980s. The guidance for zinc addition has been revised in the Guidelines to reflect concerns with fuel performance. While zinc addition is a successful method for shutdown dose rate control, concerns still exist for high zinc deposition on fuel surfaces, especially when feedwater iron is elevated and as fuel cores are being driven to provide maximum power output over longer fuel cycles. Recent plant experience has shown that the utilization of online noble metal application and continued zinc addition may provide additional benefits for radiation control. Dose rate experiences at plants utilizing the online noble metal application technology and zinc addition

  12. BWR Assembly Optimization for Minor Actinide Recycling

    Energy Technology Data Exchange (ETDEWEB)

    G. Ivan Maldonado; John M. Christenson; J.P. Renier; T.F. Marcille; J. Casal

    2010-03-22

    The Primary objective of the proposed project is to apply and extend the latest advancements in LWR fuel management optimization to the design of advanced boiling water reactor (BWR) fuel assemblies specifically for the recycling of minor actinides (MAs).

  13. BWR type nuclear power plant

    International Nuclear Information System (INIS)

    Matsumoto, Kosuke.

    1991-01-01

    In a BWR type nuclear power plant in which reactor water in a reactor pressure vessel can be drained to a waste processing system by way of reactor recycling pipeways and remaining heat removal system pipeways, a pressurized air supply device is disposed for supplying air for pressurizing reactor water to the inside of the reactor pressure vessel by way of an upper head. With such a constitution, since the pressurized air sent from the pressurized air supply device above the reactor pressure vessel for the reactor water discharging pressure upon draining, the water draining pressure is increased compared with a conventional case and, accordingly, the amount of drained water is not reduced even in the latter half of draining. Accordingly, the draining efficiency can be improved and only a relatively short period of time is required till the completion of the draining, which can improve safety and save labors. (T.M.)

  14. Supplements and other changes to an approved application. Final rule.

    Science.gov (United States)

    2004-04-08

    The Food and Drug Administration (FDA) is amending its regulations on supplements and other changes to an approved application to implement the manufacturing changes provision of the Food and Drug Administration Modernization Act of 1997 (the Modernization Act). The final rule requires manufacturers to assess the effects of manufacturing changes on the identity, strength, quality, purity, and potency of a drug or biological product as those factors relate to the safety or effectiveness of the product. The final rule sets forth requirements for changes requiring supplement submission and approval before the distribution of the product made using the change, changes requiring supplement submission at least 30 days prior to the distribution of the product, changes requiring supplement submission at the time of distribution, and changes to be described in an annual report.

  15. Space Processing Applications Rocket project, SPAR 1. Final report

    International Nuclear Information System (INIS)

    Reeves, F.; Chassay, R.

    1976-12-01

    The experiment objectives, design/operational concepts, and final results of each of nine scientific experiments conducted during the first Space Processing Applications Rocket (SPAR) flight are summarized. The nine individual SPAR experiments, covering a wide and varied range of scientific materials processing objectives, were entitled: solidification of Pb-Sb eutectic, feasibility of producing closed-cell metal foams, characterization of rocket vibration environment by measurement of mixing of two liquids, uniform dispersions of crystallization processing, direct observation of solidification as a function of gravity levels, casting thoria dispersion-strengthened interfaces, contained polycrystalline solidification, and preparation of a special alloy for manufacturing of magnetic hard superconductor under zero-g environment

  16. Space Processing Applications rocket project SPAR III. Final report

    International Nuclear Information System (INIS)

    Reeves, F.

    1978-01-01

    This document presents the engineering report and science payload III test report and summarizes the experiment objectives, design/operational concepts, and final results of each of five scientific experiments conducted during the third Space Processing Applications Rocket (SPAR) flight flown by NASA in December 1976. The five individual SPAR experiments, covering a wide and varied range of scientific materials processing objectives, were entitled: Liquid Mixing, Interaction of Bubbles with Solidification Interfaces, Epitaxial Growth of Single Crystal Film, Containerless Processing of Beryllium, and Contact and Coalescence of Viscous Bodies

  17. SKB's safety case for a final repository license application

    International Nuclear Information System (INIS)

    Hedin, Allan; Andersson, Johan

    2014-01-01

    The safety assessment SR-Site is a main component in SKB's license application, submitted in March 2011, to construct and operate a final repository for spent nuclear fuel at Forsmark in the municipality of Oesthammar, Sweden. Its role in the application is to demonstrate long-term safety for a repository at Forsmark. The assessment relates to the KBS-3 disposal concept in which copper canisters with a cast iron insert containing spent nuclear fuel are surrounded by bentonite clay and deposited at approximately 500 m depth in saturated, granitic rock. The principal regulatory acceptance criterion, issued by the Swedish Radiation Safety Authority (SSM), requires that the annual risk of harmful effects after closure not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. SSM's regulations also imply that the assessment time for a repository of this type is one million years after closure. The licence applied for is one in a stepwise series of permits, each requiring a safety report. The next step concerns a permit to start excavation of the repository and requires a preliminary safety assessment report (PSAR) covering both operational and post-closure safety. Later steps include permission to commence trial operation, to commence regular operation and to close the final repository. (authors)

  18. A practical methodology of radiological protection for the reduction of hot particles in BWR type reactors; Una metodologia practica de proteccion radiologica para la reduccion de particulas calientes en reactores BWR

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez G, G [Comision Federal de Electricidad, Gerencia del Proyecto Nucleoelectrico Laguna Verde, Disciplina de Fisica Aplicada (Mexico)

    1991-07-01

    The purpose of this work, in general form, is to describe a practical method for reduction of hot particles generated as consequence of the operational activities of BWR nuclear reactors. This methodology provides a description of the localizations and/or probable activities of finding particles highly radioactive denominated hot particles. For this purpose it was developed a strategy based on the decontamination lineaments, as well as the manipulation, gathering, registration, contention, documentation, control and final disposition of the hot particles. In addition, some recommendations are reiterated and alternative, in order to gathering the hot particles in a dynamic way given to the activities of the personal occupationally exposed in highly radioactive areas. The structure of the methodology of hot particles is supported in the radiological controls based on the Code of Federal Regulation 10 CFR 20 as well as the applicable regulatory documents. It provides an idea based on administrative controls of radiological protection, in order to suggesting the responsibilities and necessary directing for the control of the hot particles required in nuclear plants of the BWR type. (author)

  19. Lithium-polymer batteries for EV applications. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, J.O. [Uppsala Univ. (Sweden). Dept. of Inorganic Chemistry

    2000-05-01

    The project initially held a strong 'battery materials' profile, but has moved in its final year into more 'battery engineering' aspects; the performances of a range of potential materials have been screened, and candidates have emerged. It is noteworthy that these same materials have also now become 'best-choice' materials in commercial Japanese Li-ion batteries for mobile-phone, lap-top and, more recently, even electric-vehicle (EV) applications. It is now clear that the Li-ion (polymer) battery offers a genuinely viable option in electric and electric-hybrid vehicle concepts. Specifically, our work has involved synthetic, structural, morphological and electrochemical studies of lithium insertion mechanisms in TMO-based cathodes (LiMn{sub 2}O{sub 4}, V{sub 6}O{sub 13}, LiCoO{sub 2}, LiFePO{sub 4}, etc) and graphitic carbon anodes. Performance has been optimised from cell capacity, power, shelf-life and safety viewpoints. Cost has also emerged as a critical variable. Novel methods have been developed within the project for elevated-temperature battery studies (up to 80 deg C); they have become widely applied internationally. The electrode materials which have been developed have subsequently been incorporated into laboratory-scale lithium-ion battery prototypes, whose performance has then been evaluated. The final phase of the project has focussed on a new cathode material (LiFePO{sub 4}) not in current commercial use and yet ideally suited to EV application by virtue of its cheapness, high capacity (ca 170 mAh/g), high voltage vs. Li (3.5V), and extremely flat discharge curve. This could well prove to be the 'best compromise' Li-ion battery cathode for EV applications in the future.

  20. Application and Network-Cognizant Proxies - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Antonio Ortega; Daniel C. Lee

    2003-03-24

    OAK B264 Application and Network-Cognizant Proxies - Final Report. Current networks show increasing heterogeneity both in terms of their bandwidths/delays and the applications they are required to support. This is a trend that is likely to intensify in the future, as real-time services, such as video, become more widely available and networking access over wireless links becomes more widespread. For this reason they propose that application-specific proxies, intermediate network nodes that broker the interactions between server and client, will become an increasingly important network element. These proxies will allow adaptation to changes in network characteristics without requiring a direct intervention of either server or client. Moreover, it will be possible to locate these proxies strategically at those points where a mismatch occurs between subdomains (for example, a proxy could be placed so as to act as a bridge between a reliable network domain and an unreliable one). This design philosophy favors scalability in the sense that the basic network infrastructure can remain unchanged while new functionality can be added to proxies, as required by the applications. While proxies can perform numerous generic functions, such as caching or security, they concentrate here on media-specific, and in particular video-specific, tasks. The goal of this project was to demonstrate that application- and network-specific knowledge at a proxy can improve overall performance especially under changing network conditions. They summarize below the work performed to address these issues. Particular effort was spent in studying caching techniques and on video classification to enable DiffServ delivery. other work included analysis of traffic characteristics, optimized media scheduling, coding techniques based on multiple description coding, and use of proxies to reduce computation costs. This work covered much of what was originally proposed but with a necessarily reduced scope.

  1. Improvement for BWR operator training

    International Nuclear Information System (INIS)

    Kurisu, Takanori; Takahashi, Yoshitaka; Harada, Mitsuhiro; Takahashi, Iwao.

    1988-01-01

    BWR Operator Training Center was founded in April, 1971, and in April, 1974, training was begun, since then, 13 years elapsed. During this period, the curriculum and training facilities were strengthened to meet the training needs, and the new training techniques from different viewpoint were developed, thus the improvement of training has been done. In this report, a number of the training techniques which have been developed and adopted recently, and are effective for the improvement of the knowledge and skill of operators are described. Recently Japanese nuclear power stations have been operated at stable high capacity factor, accordingly the chance of experiencing the occurrence of abnormality and the usual start and stop of plants decreased, and the training of operators using simulators becomes more important. The basic concept on training is explained. In the standard training course and the short period fundamental course, the development of the guide for reviewing lessons, the utilization of VTRs and the development of the techniques for diagnosing individual degree of learning were carried out. The problems, the points of improvement and the results of these are reported. (Kako, I.)

  2. Fundamentals of boiling water reactor (BWR)

    International Nuclear Information System (INIS)

    Bozzola, S.

    1982-01-01

    These lectures on fundamentals of BWR reactor physics are a synthesis of known and established concepts. These lectures are intended to be a comprehensive (even though descriptive in nature) presentation, which would give the basis for a fair understanding of power operation, fuel cycle and safety aspects of the boiling water reactor. The fundamentals of BWR reactor physics are oriented to design and operation. In the first lecture general description of BWR is presented, with emphasis on the reactor physics aspects. A survey of methods applied in fuel and core design and operation is presented in the second lecture in order to indicate the main features of the calculational tools. The third and fourth lectures are devoted to review of BWR design bases, reactivity requirements, reactivity and power control, fuel loading patterns. Moreover, operating limits are reviewed, as the actual limits during power operation and constraints for reactor physics analyses (design and operation). The basic elements of core management are also presented. The constraints on control rod movements during the achieving of criticality and low power operation are illustrated in the fifth lecture. Some considerations on plant transient analyses are also presented in the fifth lecture, in order to show the impact between core and fuel performance and plant/system performance. The last (sixth) lecture is devoted to the open vessel testing during the startup of a commercial BWR. A control rod calibration is also illustrated. (author)

  3. BWR full integral simulation test (FIST) pretest predictions with TRACBO2

    International Nuclear Information System (INIS)

    Sutherland, W.A.; Alamgir, M.

    1984-01-01

    The Full Integral Simulation Test program is a three pronged approach to the development of best-estimate analysis capability for BWR systems. An analytical method development program is underway to extend the BWR-TRAC computer code to model reactor kinetics and major interfacing systems, including balance-of-plant, to improve application modeling flexibility, and to reduce computer running time. An experimental program is underway in a new single bundle system test facility to extend the large break loss-of-coolant accident LOCA data base to small breaks and operational transients. And a method qualification program is underway to test TRACBO2 against experiments in the FIST facility. The recently completed Phase 1 period included a series of LOCA and power transient tests, and successful pretest analysis of the large and small break LOCA tests with TRACBO2. These comparisons demonstrate BWR-TRAC capability for small and large break analysis, and provide detailed understanding of the phenomena

  4. Subchannel analysis of a critical power test, using simulated BWR 8x8 fuel assembly

    International Nuclear Information System (INIS)

    Mitsutake, T.; Terasaka, H.; Yoshimura, K.; Oishi, M.; Inoue, A.; Akiyama, M.

    1990-01-01

    Critical power predictions have been compared with the critical power test data obtained in simulated BWR 8x8 fuel rod assemblies. Two analytical methods for the critical power prediction in rod assemblies are used in the prediction, which are the subchannel analysis using the COBRA/BWR subchannel computer code with empirical critical heat flux (CHF) correlations and the liquid film dryout estimation using the CRIPP-3F 'multi-fluid' computer code. Improvements in both the analytical methods were made for spacer effect modeling, though they were specific for application to the current BWR rod assembly type. In general a reasonable agreement was obtained, though comparisons, between the prediction and the obtained test data. (orig.)

  5. Time-dependent coolant velocity measurements in an operating BWR

    International Nuclear Information System (INIS)

    Luebbesmeyer, D.; Crowe, R.D.

    1980-01-01

    A method to measure time-dependent fluid velocities in BWR-bundle elements by noise analysis of the incore-neutron-detector signals is shown. Two application examples of the new method are given. The time behaviour of the fluid velocity in the bundle element during a scheduled power excursion of the plant. The change of power was performed by changing the coolant flow through the core The apparent change of the fluid velocity due to thermal elongation of the helix-drive of the TIP-system. A simplified mathematical model was derived for this elongation to use as a reference to check the validity of the new method. (author)

  6. Neutron dosimetry. Environmental monitoring in a BWR type reactor

    International Nuclear Information System (INIS)

    Tavera D, L.; Camacho L, M.E.

    1991-01-01

    The measurements carried out on reactor dosimetry are applied mainly to the study on the effects of the radiation in 108 materials of the reactor; little is on the environmental dosimetry outside of the primary container of BWR reactors. In this work the application of a neutron spectrometer formed by plastic detectors of nuclear traces manufactured in the ININ, for the environmental monitoring in penetrations around the primary container of the unit I of the Laguna Verde central is presented. The neutron monitoring carries out with purposes of radiological protection, during the operational tests of the reactor. (Author)

  7. Decontamination and materials corrosion concerns in the BWR

    International Nuclear Information System (INIS)

    Gordon, B.M.; Gordon, G.M.

    1988-01-01

    The qualification of chemical decontamination processes to decontaminate complete systems or individual components in essential if effective inspection, maintenance, repair or replacement of plant components is to be achieved with minimum exposure of workers to ionizing radiation. However, it is critical that the benefits of decontamination processes are not overshadowed by deleterious materials/ corrosion side effects during the application of the process or during subsequent operation. This paper discusses such potential corrosion/materials problems in the BWR and presents relevant available corrosion data for the various commercial decontamination processes. (author)

  8. Accident sequence analysis for a BWR [Boiling Water Reactor] during low power and shutdown operations

    International Nuclear Information System (INIS)

    Whitehead, D.W.; Hake, T.M.

    1990-01-01

    Most previous Probabilistic Risk Assessments have excluded consideration of accidents initiated in low power and shutdown modes of operation. A study of the risk associated with operation in low power and shutdown is being performed at Sandia National Laboratories for a US Boiling Water Reactor (BWR). This paper describes the proposed methodology for the analysis of the risk associated with the operation of a BWR during low power and shutdown modes and presents preliminary information resulting from the application of the methodology. 2 refs., 2 tabs

  9. Final Report. Center for Scalable Application Development Software

    Energy Technology Data Exchange (ETDEWEB)

    Mellor-Crummey, John [Rice Univ., Houston, TX (United States)

    2014-10-26

    The Center for Scalable Application Development Software (CScADS) was established as a part- nership between Rice University, Argonne National Laboratory, University of California Berkeley, University of Tennessee – Knoxville, and University of Wisconsin – Madison. CScADS pursued an integrated set of activities with the aim of increasing the productivity of DOE computational scientists by catalyzing the development of systems software, libraries, compilers, and tools for leadership computing platforms. Principal Center activities were workshops to engage the research community in the challenges of leadership computing, research and development of open-source software, and work with computational scientists to help them develop codes for leadership computing platforms. This final report summarizes CScADS activities at Rice University in these areas.

  10. ABB advanced BWR and PWR fuel

    International Nuclear Information System (INIS)

    Junkrans, S.; Helmersson, S.; Andersson, S.

    1999-01-01

    Fuel designed and fabricated by ABB is now operating in 40 PWRs and BWRs in Europe, the United States and Korea. An excellent fuel reliability track record has been established. High burnups are proven for both BWR and PWR. Thermal margin improving features and advanced burnable absorber concepts enable the utilities to adopt demanding duty cycles to meet new economic objectives. In particular we note the excellent reliability record of ABB PWR fuel equipped with Guardian TM debris filter, proven to meet the -6 rod-cycles fuel failure goal, and the out-standing operating record of the SVEA 10x10 BWR fuel, where ABB is the only vendor to date with multi batch experience to high burnup. ABB is dedicated to maintain high fuel reliability as well as continually improve and develop a broad line of BWR and PWR products. ABB's development and fuel follow-up activities are performed in close co-operation with its customers. (orig.)

  11. Integrated sequence analysis. Final report

    International Nuclear Information System (INIS)

    Andersson, K.; Pyy, P.

    1998-02-01

    The NKS/RAK subprojet 3 'integrated sequence analysis' (ISA) was formulated with the overall objective to develop and to test integrated methodologies in order to evaluate event sequences with significant human action contribution. The term 'methodology' denotes not only technical tools but also methods for integration of different scientific disciplines. In this report, we first discuss the background of ISA and the surveys made to map methods in different application fields, such as man machine system simulation software, human reliability analysis (HRA) and expert judgement. Specific event sequences were, after the surveys, selected for application and testing of a number of ISA methods. The event sequences discussed in the report were cold overpressure of BWR, shutdown LOCA of BWR, steam generator tube rupture of a PWR and BWR disturbed signal view in the control room after an external event. Different teams analysed these sequences by using different ISA and HRA methods. Two kinds of results were obtained from the ISA project: sequence specific and more general findings. The sequence specific results are discussed together with each sequence description. The general lessons are discussed under a separate chapter by using comparisons of different case studies. These lessons include areas ranging from plant safety management (design, procedures, instrumentation, operations, maintenance and safety practices) to methodological findings (ISA methodology, PSA,HRA, physical analyses, behavioural analyses and uncertainty assessment). Finally follows a discussion about the project and conclusions are presented. An interdisciplinary study of complex phenomena is a natural way to produce valuable and innovative results. This project came up with structured ways to perform ISA and managed to apply the in practice. The project also highlighted some areas where more work is needed. In the HRA work, development is required for the use of simulators and expert judgement as

  12. Neutron dosimetry. Environmental monitoring in a BWR type reactor; Dosimetria de neutrones. Monitoreo ambiental en un reactor del tipo BWR

    Energy Technology Data Exchange (ETDEWEB)

    Tavera D, L; Camacho L, M E

    1991-01-15

    The measurements carried out on reactor dosimetry are applied mainly to the study on the effects of the radiation in 108 materials of the reactor; little is on the environmental dosimetry outside of the primary container of BWR reactors. In this work the application of a neutron spectrometer formed by plastic detectors of nuclear traces manufactured in the ININ, for the environmental monitoring in penetrations around the primary container of the unit I of the Laguna Verde central is presented. The neutron monitoring carries out with purposes of radiological protection, during the operational tests of the reactor. (Author)

  13. BWR radiation exposure--experience and projection

    International Nuclear Information System (INIS)

    Falk, C.F.; Wilkinson, C.D.; Hollander, W.R.

    1979-01-01

    The BWR/6 Mark III radiation exposures are projected to be about half of those of current average operating experience of 725 man-rem. These projections are said to be realistic and based on current achievements and not on promises of future development. The several BWRs operating with low primary system radiation levels are positive evidence that radiation sources can be reduced. Improvements have been made in reducing the maintenance times for the BWR/6, and further improvements can be made by further attention to cost-effective plant arrangement and layout during detail design to improve accessibility and maintainability of each system and component

  14. General Electric's training program for BWR chemists

    International Nuclear Information System (INIS)

    Osborn, R.N.; Lim, W.

    1981-01-01

    This paper describes the development and implementation of the General Electric boiling water reactor chemistry training program from 1959 to the present. The original intention of this program was to provide practical hands on type training in radiochemistry to BWR chemistry supervisors with fossil station experience. This emphasis on radiochemistry has not changed through the years, but the training has expanded to include the high purity water chemistry of the BWR and has been modified to include new commission requirements, engineering developments and advanced instrumentation. Student and instructor qualifications are discussed and a description of the spin off courses for chemistry technicians and refresher training is presented

  15. BWR plant analyzer development at BNL

    International Nuclear Information System (INIS)

    Cheng, H.S.; Wulff, W.; Mallen, A.N.; Lekach, S.V.; Stritar, A.; Cerbone, R.J.

    1985-01-01

    Advanced technology for high-speed interactive nuclear power plant simulations is of great value for timely resolution of safety issues, for plant monitoring, and for computer-aided emergency responses to an accident. Presented is the methodology employed at BNL to develop a BWR plant analyzer capable of simulating severe plant transients at much faster than real-time process speeds. Five modeling principles are established and a criterion is given for selecting numerical procedures and efficient computers to achieve the very high simulation speeds. Typical results are shown to demonstrate the modeling fidelity of the BWR plant analyzer

  16. The BWR Hybrid 4 control rod

    International Nuclear Information System (INIS)

    Gross, H.; Fuchs, H.P.; Lippert, H.J.; Dambietz, W.

    1988-01-01

    The service life of BWR control rods designed in the past has been unsatisfactory. The main reason was irradiation assisted stress corrosion cracking of B 4 C rods caused by external swelling of the B 4 C powder. By this reason KWU developed an improved BWR control rod (Hybrid 4 control rod) with extended service life and increased control rod worth. It also allows the procedure for replacing and rearranging fuel assemblies to be considerably simplified. A complete set of Hydbrid 4 control rods is expected to last throughout the service life of a plant (assumption: ca. 40 years) if an appropriate control rod reshuffling management program is used. (orig.)

  17. Improvement for BWR operator training, 3

    International Nuclear Information System (INIS)

    Noji, Kunio; Toeda, Susumu; Saito, Genhachi; Suzuki, Koichi

    1990-01-01

    BWR Operator Training Center Corporation (BTC) is conducting training for BWR plant operators using Full-scope Simulators. There are several courses for individual operators and one training course for shift crew (Family Training Course) in BTC. Family Training is carried out by all members of the operating shift-crew. BTC has made efforts to improve the Family Training in order to acquire more effective training results and contribute to up-grade team performance of all crews. This paper describes some items of our efforts towards Family Training improvement. (author)

  18. Panorama of the BWR reactors - Evolution of the concept

    Energy Technology Data Exchange (ETDEWEB)

    Novotny, C.; Uhrig, E. [AREVA NP GmbH, Safety Engineering Department - PEPS-G (Germany)

    2012-01-15

    Nowadays, a fleet of more than 50 boiling water reactors (BWR) are in operation in the world. This article gives a short overview on the developments of nuclear power plants of the BWR type, with a focus on the European builds. It describes the technical bases from the early designs in the fifties, sketches the innovations of the sixties and seventies in the types BWR 69 and 72 (Baulinie 69 and 72) and gives an outlook of a possible next generation BWR. A promising approach in recent BWR developments is the the combination of passive safety systems with established design basis

  19. Application of the FFTBM method and the power relative contribution to the discharge transitory of the recirculation pumps of a BWR; Aplicacion del metodo FFTBM y de la contribucion relativa de potencia al transitorio de disparo de las bombas de recirculacion de un BWR

    Energy Technology Data Exchange (ETDEWEB)

    Castillo D, R.; Ortiz V, J.; Fuentes M, L., E-mail: rogelio.castillo@inin.gob.mx [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)

    2013-10-15

    In this work was realized the simulation of the discharge transitory of both recirculation pumps of a BWR with the Simulate-3K code. This type of transitory is used in the stability analyses for the licensing of the fuel reload. An analysis of the precision of the simulation is also presented, using the FFTBM method jointly with the power relative contribution. This way, instead of determining the total precision of the calculation, a weighed precision is obtained by the contribution of each relevant parameter of the transitory. The results show that the precision of the simulation is acceptable due to the small magnitude of the merit figure of the width total average. The error in the merit figure comes mainly from the parameters total flow in the core and temperature of the fuel in the core. (Author)

  20. A detailed BWR recirculation loop model for RELAP

    Energy Technology Data Exchange (ETDEWEB)

    Araiza-Martínez, Enrique, E-mail: enrique.araiza@inin.gob.mx; Ortiz-Villafuerte, Javier, E-mail: javier.ortiz@inin.gob.mx; Castillo-Durán, Rogelio, E-mail: rogelio.castillo@inin.gob.mx

    2017-01-15

    Highlights: • A new detailed BWR recirculation loop model was developed for RELAP. • All jet pumps, risers, manifold, suction and control valves, and recirculation pump are modeled. • Model is tested against data from partial blockage of two jet pumps. • For practical applications, simulation results showed good agreement with available data. - Abstract: A new detailed geometric model of the whole recirculation loop of a BWR has been developed for the code RELAP. This detailed model includes the 10 jet pumps, 5 risers, manifold, suction and control valves, and the recirculation pump, per recirculation loop. The model is tested against data from an event of partial blockage at the entrance nozzle of one jet pump in both recirculation loops. For practical applications, simulation results showed good agreement with data. Then, values of parameters considered as figure of merit (reactor power, dome pressure, core flow, among others) for this event are compared against those from the common 1 jet pump per loop model. The results show that new detailed model led to a closer prediction of the reported power change. The detailed recirculation loop model can provide more reliable boundary condition data to a CFD models for studies of, for example, flow induced vibration, wear, and crack initiation.

  1. Moderator temperature coefficient in BWR core

    International Nuclear Information System (INIS)

    Naito, Yoshitaka

    1977-01-01

    Temperature dependences of infinite multiplication factor k sub(infinity) and neutron leakage from the core must be examined for estimation of moderator temperature coefficient. Temperature dependence on k sub(infinity) has been investigated by many researchers, however, the dependence on neutron leakage of a BWR with cruciformed control rods has hardly been done. Because there are difficulties and necessity on calculations of three space dimensional and multi-energy groups neutron distribution in a BWR core. In this study, moderator temperature coefficients of JPDR-II (BWR) core were obtained by calculation with DIFFUSION-ACE, which is newly developed three-dimensional multi-group computer code. The results were compared with experimental data measured from 20 to 275 0 C of the moderator temperature and the good agreement was obtained between calculation and measurement. In order to evaluate neutron leakage from the core, the other two calculations were carried out, adjusting criticality by uniform absorption rate and by material buckling. The former underestimated neutron leakage and the latter overestimated it. Discussion on the results shows that in order to estimate the temperature coefficient of BWR, neutron leakage must be evaluated precisely, therefore the calculation at actual pattern of control rods is necessary. (auth.)

  2. BWR vessel and internals project (BWRVIP)

    International Nuclear Information System (INIS)

    Bilanin, W.J.; Dyle, R.L.

    1996-01-01

    Recent Boiling Water Reactor (BWR) inspections indicate that Intergranular Stress Corrosion Cracking (IGSCC) is a significant technical issue for some BWR internals. IN response, the Boiling Water Reactor Vessel and Internals Project (BWRVIP) was formed by an associated of domestic and international utilities which own and operate BWRs. The project is identifying or developing generic, cost-effective strategies for managing degradation of reactor internals from which each utility can select the alternative most appropriate for their plant. The Electric Power Research Institute manages the technical program, implementing the utility defined programs. The BWRVIP is organized into four technical tasks: Assessment, Inspection, Repair and Mitigation. An Integration task coordinates the work. The goal of the Assessment task is to develop methodologies for evaluation of vessel and internal components in support of decisions for operation, inspection, mitigation or repair. The goal of the Inspection task is to develop and assess effective and predictable inspection techniques which can be used to determine the condition of BWR vessel and internals that are potentially susceptible to service-related SCC degradation. The goal of the Repair task is to assure the availability of cost-effective repair/replacement alternatives. The goal of the Mitigation task is to develop and demonstrate countermeasures for SCC degradation. This paper summarizes the BWRVIP approach for addressing BWR internals SCC degradation and illustrates how utilities are utilizing BWRVIP products to successfully manage the effect of SCC on core shrouds

  3. Delivering high performance BWR fuel reliably

    International Nuclear Information System (INIS)

    Schardt, J.F.

    1998-01-01

    Utilities are under intense pressure to reduce their production costs in order to compete in the increasingly deregulated marketplace. They need fuel, which can deliver high performance to meet demanding operating strategies. GE's latest BWR fuel design, GE14, provides that high performance capability. GE's product introduction process assures that this performance will be delivered reliably, with little risk to the utility. (author)

  4. Secondary systems of PWR and BWR

    International Nuclear Information System (INIS)

    Schindler, N.

    1981-01-01

    The secondary systems of a nuclear power plant comprises the steam, condensate and feedwater cycle, the steam plant auxiliary or ancillary systems and the cooling water systems. The presentation gives a general review about the main systems which show a high similarity of PWR and BWR plants. (orig./RW)

  5. Assessment of two BWR accident management strategies

    International Nuclear Information System (INIS)

    Hodge, S.A.; Petek, M.

    1991-01-01

    Candidate mitigative strategies for management of in-vessel events during the late phase (after core degradation has occurred) of postulated BWR severe accidents were considered at Oak Ridge National Laboratory (ORNL) during 1990. The identification of new strategies was subject to the constraint that they should, to the maximum extent possible, make use of the existing equipment and water resources of the BWR facilities and not require major equipment modifications or additions. As a result of this effort, two of these candidate strategies were recommended for additional assessment. The first is a strategy for containment flooding to maintain the core and structural debris within the reactor vessel in the event that vessel injection cannot be restored to terminate a severe accident sequence. The second strategy pertains to the opposite case, for which vessel injection would be restored after control blade melting had begun; its purpose is to provide an injection source of borated water at the concentration necessary to preclude criticality upon recovering a damaged BWR core. Assessments of these two strategies have been performed during 1991 under the auspices of the Detailed Assessment of BWR In-Vessel Strategies Program. This paper provides a discussion of the motivation for and purpose of these strategies and the potential for their success. 33 refs., 9 figs

  6. BWR stability analysis at Brookhaven National Laboratory

    International Nuclear Information System (INIS)

    Wulff, W.; Cheng, H.S.; Mallen, A.N.; Rohatgi, U.S.

    1991-01-01

    Following the unexpected, but safely terminated, power and flow oscillations in the LaSalle-2 Boiling Water Reactor (BWR) on March 9, 1988, the Nuclear Regulatory Commission (NRC) Offices of Nuclear Reactor Regulation (NRR) and of Analysis and Evaluation of Operational Data (AEOD) requested that the Office of Nuclear Regulatory Research (RES) carry out BWR stability analyses, centered around fourteen specific questions. Ten of the fourteen questions address BWR stability issues in general and are dealt with in this paper. The other four questions address local, out-of-phase oscillations and matters of instrumentation; they fall outside the scope of the work reported here. It was the purpose of the work documented in this report to answer ten of the fourteen NRC-stipulated questions. Nine questions are answered by analyzing the LaSalle-2 instability and related BWR transients with the BNL Engineering Plant Analyzer (EPA) and by performing an uncertainty assessment of the EPA predictions. The tenth question is answered on the basis of first principles. The ten answers are summarized

  7. Identification and assessment of BWR in-vessel severe accident mitigation strategies

    International Nuclear Information System (INIS)

    Hodge, S.A.; Kress, T.S.; Cleveland, J.C.; Petek, M.

    1992-01-01

    This paper briefly describes the results of work carried out in support of the US Nuclear Regulatory Commission Accident Management Research Program to evaluate the effectiveness and feasibility of current and proposed strategies for BWR severe accident management. These results are described in detail in the just-released report Identification and Assessment of BWR In-Vessel Severe Accident Mitigation Strategies, NUREG/CR-5869, which comprises three categories of findings. First, an assessment of the current status of accident management strategies for the mitigation of in-vessel events for BWR severe accident sequences is combined with a review of the BWR Owners' Group Emergency Procedure Guidelines (EPGs) to determine the extent to which they currently address the characteristic events of an unmitigated severe accident. Second, where considered necessary, new candidate accident management strategies are proposed for mitigation of the late-phase (after core damage has occurred) events. Finally, two of the four candidate strategies identified by this effort are assessed in detail. These are (1) preparation of a boron solution for reactor vessel refill should control blade damage occur during a period of temporary core dryout and (2) containment flooding to maintain the core debris within the reactor vessel if the injection systems cannot be restored

  8. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Science.gov (United States)

    2010-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis... 10 Energy 2 2010-01-01 2010-01-01 false Contents of applications; technical information in final safety analysis report. 52.157 Section 52.157 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES...

  9. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Science.gov (United States)

    2010-01-01

    ...; technical information in final safety analysis report. (a) The application must contain a final safety... 10 Energy 2 2010-01-01 2010-01-01 false Contents of applications; technical information in final safety analysis report. 52.79 Section 52.79 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES...

  10. Efforts for optimization of BWR core internals replacement

    International Nuclear Information System (INIS)

    Iizuka, N.

    2000-01-01

    The core internal components replacement of a BWR was successfully completed at Fukushima-Daiichi Unit 3 (1F3) of the Tokyo Electric Power Company (TEPCO) in 1998. The core shroud and the majority of the internal components made by type 304 stainless steel (SS) were replaced with the ones made of low carbon type 316L SS to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. Although this core internals replacement project was completed, several factors combined to result in a longer-than-expected period for the outage. It was partly because the removal work of the internal components was delayed. Learning a lesson from whole experience in this project, some methods were adopted for the next replacement project at Fukushima-Daiichi Unit 2 (1F2) to shorten the outage and reduce the total radiation exposure. Those are new removal processes and new welding machine and so on. The core internals replacement work was ended at 1F2 in 1999, and both the period of outage and the total radiation exposure were the same degree as expected previous to starting of this project. This result shows that the methods adopted in this project are basically applicable for the core internals replacement work and the whole works about the BWR core internals replacement were optimized. The outline of the core internals replacement project and applied technologies at 1F3 and 1F2 are discussed in this paper. (author)

  11. BWR Servicing and Refueling Improvement Program: Phase I summary report

    Energy Technology Data Exchange (ETDEWEB)

    Perry, D.R.

    1978-09-01

    Under the U.S. Department of Energy sponsorship, General Electric Co. (GE) undertook a study of boiling water reactor (BWR) refueling outages for the purpose of recommending the development and demonstration of critical path time savings improvements. The Tennessee Valley Authority (TVA) joined the study as a subcontractor, providing monitoring assistance and making the Browns Ferry Site available for improvement demonstrations. Agreement was also reached with Georgia Power Co., Power Authority of the State of New York, and Commonwealth Edison Co. for monitoring and data collection at Hatch 1, FitzPatrick, and Quad Cities 1 nuclear plants, respectively. The objective was to identify, develop, and demonstrate improved refueling, maintenance, and inspection procedures and equipment. The improvements recommended in this study are applicable to BWR nuclear plants currently in operation as well as those in the design and construction phases. The recommendations and outage information can be used as a basis to plan and conduct the first outages of new plants and to improve the planning and facilities of currently operating plants. Many of the recommendations can readily be incorporated in plants currently in the design and construction phases as well as in the design of future plants. Many of these recommended improvements can be implemented immediately by utilities without further technical development.

  12. Transmutation of minor actinide using BWR fueled mixed oxide

    International Nuclear Information System (INIS)

    Susilo, Jati

    2000-01-01

    Nuclear spent fuel recycle has a strategic importance in the aspect of nuclear fuel economy and prevention of its spread-out. One among other application of recycle is to produce mixed oxide fuel (Mo) namely mixed Plutonium and uranium oxide. As for decreasing the burden of nuclear high level waste (HLW) treatment, transmutation of minor actinide (MA) that has very long half life will be carried out by conversion technique in nuclear reactor. The purpose of this study was to know influence of transition fuel cell regarding the percent weight of transmutation MA in the BWR fueled MOX. Calculation of cell BWR was used SRAC computer code, with assume that the reactor in equilibrium. The percent weight of transmutation MA to be optimum by increasing the discharge burn-up of nuclear fuel, raising ratio of moderator to fuel volume (Vm/Vf), and loading MA with percent weight about 3%-6% and also reducing amount of percent weight Pu in MOX fuel. For mixed fuel standard reactor, reactivity value were obtained between about -50pcm ∼ -230pcm for void coefficient and -1.8pcm ∼ -2.6pcm for fuel temperature coefficient

  13. BWR Servicing and Refueling Improvement Program: Phase I summary report

    International Nuclear Information System (INIS)

    Perry, D.R.

    1978-09-01

    Under the U.S. Department of Energy sponsorship, General Electric Co. (GE) undertook a study of boiling water reactor (BWR) refueling outages for the purpose of recommending the development and demonstration of critical path time savings improvements. The Tennessee Valley Authority (TVA) joined the study as a subcontractor, providing monitoring assistance and making the Browns Ferry Site available for improvement demonstrations. Agreement was also reached with Georgia Power Co., Power Authority of the State of New York, and Commonwealth Edison Co. for monitoring and data collection at Hatch 1, FitzPatrick, and Quad Cities 1 nuclear plants, respectively. The objective was to identify, develop, and demonstrate improved refueling, maintenance, and inspection procedures and equipment. The improvements recommended in this study are applicable to BWR nuclear plants currently in operation as well as those in the design and construction phases. The recommendations and outage information can be used as a basis to plan and conduct the first outages of new plants and to improve the planning and facilities of currently operating plants. Many of the recommendations can readily be incorporated in plants currently in the design and construction phases as well as in the design of future plants. Many of these recommended improvements can be implemented immediately by utilities without further technical development

  14. TRAB, a transient analysis program for BWR. Part 1

    International Nuclear Information System (INIS)

    Rajamaeki, Markku.

    1980-03-01

    TRAB is a transient analysis program for BWR. The present report describes its principles. The program has been developed from TRAWA-program. It models the interior of the pressure vessel and related subsystems of BWR viz. reactor core, recirculation loop including the upper part of the vessel, recirculation pumps, incoming and outgoing flow systems, and control and protection systems. Concerning core phenomena and all flow channel hydraulics the submodels are one-dimensional of main features. The geometry is very flexible. The program has been made particularly to simulate various reactivity transients, but it is applicable more generally to reactor incidents and accidents in which no flow reversal or no emptying of the circuit must occur below the water level. The program is extensively supplied by input and output capabilities. The user can act upon the simulation of a transient by defining external disturbances, scheduled timevariations for any system variable, by modeling new subsystems, which are representable with ordinary linear differential equations, and by defining relations of functional form between system variables. The run of the program can be saved and restarted. (author)

  15. Propagation of cracks by stress corrosion in conditions of BWR type reactor; Propagacion de grietas por corrosion bajo esfuerzo en condiciones de reactor de agua en ebullicion (BWR)

    Energy Technology Data Exchange (ETDEWEB)

    Merino C, F.J. [ININ, 52045 Estado de Mexico (Mexico); Fuentes C, P. [ITT, Metepec, Estado de Mexico (Mexico)]. E-mail: fjmc@nuclear.inin.mx

    2004-07-01

    In this work, the obtained results when applying the Hydrogen Chemistry to a test tube type Compact Tension (CT), built in austenitic stainless steel 304l, simulating the conditions to those that it operates a Boiling Water Reactor (BWR), temperature 288 C and pressure of 8 MPa are presented. With the application of this water chemistry, seeks to be proven the diminution of the crack propagation speed. (Author)

  16. Artificial intelligence applications in logistics information systems : final report

    Science.gov (United States)

    1990-04-01

    This report is the principal deliverable from the LIMSS-AI project. It summarizes the results of a survey of existing applications and discusses the feasibility and benefits of specific candidate logistics applications.

  17. Reliability and improvement of RODOS results for a BWR plant; Erhoehung der Zuverlaessigkeit der RODOS-Ergebnisse fuer eine SWR-Anlage

    Energy Technology Data Exchange (ETDEWEB)

    Loeffler, H.; Cester, F.; Sonnenkalb, M.; Klein-Hessling, W.; Voggenberger, T.

    2009-06-15

    Decision support systems such as RODOS aim to support the responsible authorities by providing estimates for the possible radiological consequences in case of an event in a nuclear plant. The prognosis of quantity, composition and time of occurrence of a release from the plant (''source term'') in the so-called pre-release phase is one of the foundations with high relevance for this purpose. Within previous projects source term prognosis tools have been developed and applied exemplarily for a PWR. At the end of 2005 GRS has finalized a PSA level 2 for a plant of the SWR-69 type. On this basis improved versions of the source term prognosis tools QPRO (probabilistic) and ASTRID (deterministic) have been created for a BWR and tested in an emergency exercise in a BWR. The further development of QPRO has been related in particular to the structure of the probabilistic network and the precalculated source terms. The activities for the adaptation of ASTRID focus on the creation of the dataset for the BWR coolant loop and the containment. In the emergency exercise the manageability of QPRO but also of ASTRID has been proven. Further, the first phases of the accident progression have been well identified. However, the exercise scenario developed into a very unlikely sequence with partial core melt, and the reactor building ventilation was shut off just at a critical moment. Therefore the source term prognoses deviate from the exercise scenario. Starting from these experiences with the development and application of QPRO and ASTRID recommendations are given for the further improvement of the reliability of the source term prognosis for RODOS. In general it can be stated that the development status of QPRO and ASTRID is definitely advanced compared to the presently still prevailing source term prognosis methods. Therefore it is recommended to develop plant specific versions of these codes and to apply them.

  18. BWR radiation buildup control with ionic zinc

    International Nuclear Information System (INIS)

    Marble, W.J.; Wood, C.J.; Leighty, C.E.; Green, T.A.

    1986-01-01

    In 1983 a hypothesis was disclosed which suggested that the presence of ionic zinc in the reactor water of the BWR could reduce radiation buildup. This hypothesis was developed from correlations of plant data, and subsequently, from laboratory experiments which demonstrated clearly that ionic zinc inhibits the corrosion of stainless steel. The benefits of zinc addition have been measured at the Vallecitos Nuclear Center under and EPRI/GE project. Experimentation and analyses have been performed to evaluate the impact of intentional zinc addition on the IGSCC characteristics of primary system materials and on the performance of the nuclear fuel. It has been concluded that no negative effects are expected. The author conclude that the intentional addition of ionic zinc to the BWR reactor water at a concentration of approximately 10 ppb will provide major benefits in controlling the Co-60 buildup on primary system stainless steel surfaces. The intentional addition of zinc is now a qualified technique for use in BWRs

  19. BWR mechanics and materials technology update

    International Nuclear Information System (INIS)

    Kiss, E.

    1983-01-01

    This paper discusses technical results obtained from a variety of important programs underway at General Electric's Nuclear Engineering Division. The principal objective of these programs is to qualify and improve BWR product related technologies that fall broadly under the disciplines of Applied Mechanics and Materials Engineering. The paper identifies and deals with current technical issues that are of general importance to the LWR industry albeit the specific focus is directed to the development and qualification of analytical predictive methods and criteria, and improved materials for use in the design of the BWR. In this paper, specific results and accomplishments are summarized to provide a braod perspective of technology advances. Results are presented in sections which discuss: dynamic analysis and modeling; fatigue and fracture evaluation; materials engineering advances; and flow induced vibration. (orig.)

  20. Parallel channel effects under BWR LOCA conditions

    International Nuclear Information System (INIS)

    Suzuki, H.; Hatamiya, S.; Murase, M.

    1988-01-01

    Due to parallel channel effects, different flow patterns such as liquid down-flow and gas up-flow appear simultaneously in fuel bundles of a BWR core during postulated LOCAs. Applying the parallel channel effects to the fuel bundle, water drain tubes with a restricted bottom end have been developed in order to mitigate counter-current flow limiting and to increase the falling water flow rate at the upper tie plate. The upper tie plate with water drain tubes is an especially effective means of increasing the safety margin of a reactor with narrow gaps between fuel rods and high steam velocity at the upper tie plate. The characteristics of the water drain tubes have been experimentally investigated using a small-scaled steam-water system simulating a BWR core. Then, their effect on the fuel cladding temperature was evaluated using the LOCA analysis program SAFER. (orig.)

  1. Sensitiaztion of austenitic stainless steels and its significance as regards stress-corrosion cracking of BWR pipe systems

    International Nuclear Information System (INIS)

    Roberts, W.; Otterberg, R.

    1984-05-01

    A critical literature evaluation dealing with sensitization of austenitic stainless steels and its importance in the context of intergranular stress-corrosion cracking (IGSCC) in high-temperature, oxygenated water is presented. The factors influencing the degree of sensitization are discussed, principally for type-304 stainless steels, both as regards sensitization arising as a result of isothermal holding within the critical temperature range and weld sensitization. The phenomenon of low-temperature sensitization is described and its potential significance under BWR operating conditions speculated upon. The principal features of and mechanisms controlling IGSCC of sensitized 304 steels in BWR-type environments are reviewed and some thoughts are given to the relevance of laboratory SCC testing in predicting the occurrence of cracking in actual BWR systems. Finally various countermeasures against IGSCC in existing and projected reactors are presented and discussed. (Author)

  2. Eulerian fluid-structure analysis of BWR

    International Nuclear Information System (INIS)

    McMaster, W.H.

    1979-05-01

    A fluid-structure-interaction algorithm is developed for the analysis of the dynamic response of a BWR pressure-suppression pool and containment structure. The method is incorporated into a two-dimensional semi-implicit Eulerian hydrodynamics code, PELE-IC, for the solution of incompressible flow coupled to flexible structures. The fluid, structure, and coupling algorithms have been verified by calculation of solved problems from the literature and by comparison with air and steam blowdown experiments

  3. Delivering high performance BWR fuel reliably

    Energy Technology Data Exchange (ETDEWEB)

    Schardt, J.F. [GE Nuclear Energy, Wilmington, NC (United States)

    1998-07-01

    Utilities are under intense pressure to reduce their production costs in order to compete in the increasingly deregulated marketplace. They need fuel, which can deliver high performance to meet demanding operating strategies. GE's latest BWR fuel design, GE14, provides that high performance capability. GE's product introduction process assures that this performance will be delivered reliably, with little risk to the utility. (author)

  4. The HAMBO BWR simulator of HAMMLAB

    International Nuclear Information System (INIS)

    Karlsson, Tommy; Jokstad, Haakon; Meyer, Brita D.; Nihlwing, Christer; Norrman, Sixten; Puska, Eija Karita; Raussi, Pekka; Tiihonen, Olli

    2001-02-01

    Modernisation of control rooms of the nuclear power plants has been a major issue in Sweden and Finland the last few years, and this will continue in the years to come. As an aid in the process of introducing new technology into the control rooms, the benefit of having an experimental simulator where proto typing of solutions can be performed, has been emphasised by many plants. With this as a basis, the BWR plants in Sweden and Finland decided to fund, in co-operation with the Halden Project, an experimental BWR simulator based on the Forsmark 3 plant in Sweden. The BWR simulator development project was initiated in January 1998. VTT Energy in Finland developed the simulator models with the aid of their APROS tool, while the operator interface was developed by the Halden Project. The simulator was thoroughly tested by experienced HRP personnel and professional Forsmark 3 operators, and accepted by the BWR utilities in June 2000. The acceptance tests consisted of 19 well-defined transients, as well as the running of the simulator from full power down to cold shutdown and back up again with the use of plant procedures. This report describes the HAMBO simulator, with its simulator models, the operator interface, and the underlying hardware and software infrastructure. The tools used for developing the simulator, APROS, Picasso-3 and the Integration Platform, are also briefly described. The acceptance tests are described, and examples of the results are presented, to illustrate the level of validation of the simulator. The report concludes with an indication of the short-term usage of the simulator. (Author)

  5. PREDICTIVE METHODS FOR STABILITY MARGIN IN BWR

    OpenAIRE

    MELARA SAN ROMÁN, JOSÉ

    2016-01-01

    [EN] Power and flow oscillations in a BWR are very undesirable. One of the major concerns is to ensure, during power oscillations, compliance with GDC 10 and 12. GDC 10 requires that the reactor core be designed with appropriate margin to assure that specified acceptable fuel design limits will not be exceeded during any condition of normal operation, including the effects of anticipated operational occurrences. GDC 12 requires assurance that power oscillations which can result in conditions ...

  6. BWR level estimation using Kalman Filtering approach

    International Nuclear Information System (INIS)

    Garner, G.; Divakaruni, S.M.; Meyer, J.E.

    1986-01-01

    Work is in progress on development of a system for Boiling Water Reactor (BWR) vessel level validation and failure detection. The levels validated include the liquid level both inside and outside the core shroud. This work is a major part of a larger effort to develop a complete system for BWR signal validation. The demonstration plant is the Oyster Creek BWR. Liquid level inside the core shroud is not directly measured during full power operation. This level must be validated using measurements of other quantities and analytic models. Given the available sensors, analytic models for level that are based on mass and energy balances can contain open integrators. When such a model is driven by noisy measurements, the model predicted level will deviate from the true level over time. To validate the level properly and to avoid false alarms, the open integrator must be stabilized. In addition, plant parameters will change slowly with time. The respective model must either account for these plant changes or be insensitive to them to avoid false alarms and maintain sensitivity to true failures of level instrumentation. Problems are addressed here by combining the extended Kalman Filter and Parity Space Decision/Estimator. The open integrator is stabilized by integrating from the validated estimate at the beginning of each sampling interval, rather than from the model predicted value. The model is adapted to slow plant/sensor changes by updating model parameters on-line

  7. Economic analysis of hydride fueled BWR

    International Nuclear Information System (INIS)

    Ganda, F.; Shuffler, C.; Greenspan, E.; Todreas, N.

    2009-01-01

    The economic implications of designing BWR cores with hydride fuels instead of conventional oxide fuels are analyzed. The economic analysis methodology adopted is based on the lifetime levelized cost of electricity (COE). Bracketing values (1970 and 3010 $/kWe) are used for the overnight construction costs and for the power scaling factors (0.4 and 0.8) that correlate between a change in the capital cost to a change in the power level. It is concluded that a newly constructed BWR reactor could substantially benefit from the use of 10 x 10 hydride fuel bundles instead of 10 x 10 oxide fuel bundles design presently in use. The cost saving would depend on the core pressure drop constraint that can be implemented in newly constructed BWRs - it is between 2% and 3% for a core pressure drop constraint as of the reference BWR, between 9% and 15% for a 50% higher core pressure drop, and between 12% and 21% higher for close to 100% core pressure. The attainable cost reduction was found insensitive to the specific construction cost but strongly dependent on the power scaling factor. The cost advantage of hydride fuelled cores as compared to that of the oxide reference core depends only weakly on the uranium and SWU prices, on the 'per volume base' fabrication cost of hydride fuels, and on the discount rate used. To be economically competitive, the uranium enrichment required for the hydride fuelled core needs to be around 10%.

  8. Investigation of BWR stability in Forsmark 2

    International Nuclear Information System (INIS)

    Oguma, R.; Reisch, F.; Bergdahl, B.G.; Lorenzen, J.; Aakerhielm, F.; Kellner, S.

    1988-01-01

    A series of noise measurements have been conducted at the Forsmark-2 reactor during its start-up operation after the revision in 1987. The main purpose was to investigate the BWR stability problem based on noise analysis, i.e. the problem of resonant power oscillation with frequency of about 0.5 Hz, which tends to arise at high power and low core flow condition. The noise analysis was performed to estimate the noise source which gives rise to the power oscillation, to evaluate the stability condition of the Forsmark-2 reactor in terms of the decay ratio (DR), as well as to investigate a safety related problem in connection with the BWR stability. The results indicate that the power oscillation is due to dynamic coupling between the neutron kinetics and thermal-hydraulics via void reactivity feedback. The DR reached as high as ≅ 0.7 at 63% of the rated power and 4100 kg/s of the total core flow. An investigation was made for the noise recording which represents a strong pressure oscillation with a peak frequency at 0.33 Hz. The result suggests that such pressure oscillation, if the peak frequency coincided with that of the resonant power oscillation, might become a cause of scram. The present noise analysis indicates the importance of a BWR on-line surveillance system with functions like stability condition monitoring and control system diagnosis. (orig.)

  9. Assessment of two BWR accident management strategies

    International Nuclear Information System (INIS)

    Hodge, S.A.; Petek, M.

    1994-01-01

    Candidate mitigative strategies for the management of in-vessel events during the late phase (after-core degradation has occurred) of postulated boiling water reactor (BWR) severe accidents were considered at Oak Ridge National Laboratory (ORNL) during 1990. The identification of new strategies was subject to the constraint that they should, to the maximum extent possible, make use of the existing equipment and water resources of the BWR facilities, and not require major equipment modifications or additions. As a result of this effort, two of these candidate strategies were recommended for further assessment. The first was a strategy for containment flooding to maintain the core and structural debris within the reactor vessel in the event that vessel injection cannot be restored to terminate a severe accident sequence. The second strategy pertained to the opposite case, for which vessel injection would be restored after control blade melting had begun; its purpose was to provide an injection source of borated water at the concentration necessary to preclude criticality upon recovering a damaged BWR core. Assessments of these two strategies were performed during 1991 and this paper provides a discussion of the motivation for and purpose of these strategies, and the potential for their success. ((orig.))

  10. Scaling and uncertainty in BWR instability problems

    International Nuclear Information System (INIS)

    Di Auria, F.; Pellicoro, V.

    1995-01-01

    This paper deals with a critical review of activities, performed at the DCMN of Pisa University, in relation to the thermo-hydraulic oscillations in two-phase systems. Stability analyses, including model development and achievement of experimental data, are generally performed for BWRs in order to achieve the following objectives: to reach a common understanding in relation to the predictive capabilities of system codes and to the influence of various parameters on the instability; to establish a data base for the qualification of the analytical tools already or becoming available; to set-up qualified tools (code/models + nodalization + user assumption) suitable for predicting the unstable behaviour of the nuclear plants of interest (current BWR, SBWR, ABWR and RBMK). These considerations have been the basis for the following researches: 1) proposal of the Boiling Instability Program (BIP) (1) 2) evaluation of stability tests in PIPER-ONE apparatus (2) 3) coupled thermal-hydraulic and neutronic instabilities in the LaSalle-2 BWR plant (3) 4) participation to the NEA-OECD BWR Benchmark (4) The RELAP/MOD2 and RELAP5/MOD3 codes have been used. (author)

  11. BWR recirculation pump diagnostic expert system

    International Nuclear Information System (INIS)

    Chiang, S.C.; Morimoto, C.N.; Torres, M.R.

    2004-01-01

    At General Electric (GE), an on-line expert system to support maintenance decisions for BWR recirculation pumps for nuclear power plants has been developed. This diagnostic expert system is an interactive on-line system that furnishes diagnostic information concerning BWR recirculation pump operational problems. It effectively provides the recirculation pump diagnostic expertise in the plant control room continuously 24 hours a day. The expert system is interfaced to an on-line monitoring system, which uses existing plant sensors to acquire non-safety related data in real time. The expert system correlates and evaluates process data and vibration data by applying expert rules to determine the condition of a BWR recirculation pump system by applying knowledge based rules. Any diagnosis will be automatically displayed, indicating which pump may have a problem, the category of the problem, and the degree of concern expressed by the validity index and color hierarchy. The rules incorporate the expert knowledge from various technical sources such as plant experience, engineering principles, and published reports. These rules are installed in IF-THEN formats and the resulting truth values are also expressed in fuzzy terms and a certainty factor called a validity index. This GE Recirculation Pump Expert System uses industry-standard software, hardware, and network access to provide flexible interfaces with other possible data acquisition systems. Gensym G2 Real-Time Expert System is used for the expert shell and provides the graphical user interface, knowledge base, and inference engine capabilities. (author)

  12. BASINs and WEPP Climate Assessment Tools (CAT): Case Study Guide to Potential Applications (Final Report)

    Science.gov (United States)

    EPA announced the release of the final report, BASINs and WEPP Climate Assessment Tools (CAT): Case Study Guide to Potential Applications. This report supports application of two recently developed water modeling tools, the Better Assessment Science Integrating point & ...

  13. PWR and BWR spent fuel assembly gamma spectra measurements

    Energy Technology Data Exchange (ETDEWEB)

    Vaccaro, S. [European Commission, DG Energy, Directorate EURATOM Safeguards Luxembourg (Luxembourg); Tobin, S.J.; Favalli, A. [Los Alamos National Laboratory, Los Alamos, NM (United States); Grogan, B. [Oak Ridge National Laboratory, Oak Ridge (United States); Jansson, P. [Uppsala University, Uppsala (Sweden); Liljenfeldt, H. [Oak Ridge National Laboratory, Oak Ridge (United States); Mozin, V. [Lawrence Livermore National Laboratory, Livermore, CA (United States); Hu, J. [Oak Ridge National Laboratory, Oak Ridge (United States); Schwalbach, P. [European Commission, DG Energy, Directorate EURATOM Safeguards Luxembourg (Luxembourg); Sjöland, A. [Swedish Nuclear Fuel and Waste Management Company (SKB) (Sweden); Trellue, H.; Vo, D. [Los Alamos National Laboratory, Los Alamos, NM (United States)

    2016-10-11

    A project to research the application of nondestructive assay (NDA) to spent fuel assemblies is underway. The research team comprises the European Atomic Energy Community (EURATOM), embodied by the European Commission, DG Energy, Directorate EURATOM Safeguards; the Swedish Nuclear Fuel and Waste Management Company (SKB); two universities; and several United States national laboratories. The Next Generation of Safeguards Initiative–Spent Fuel project team is working to achieve the following technical goals more easily and efficiently than in the past using nondestructive assay measurements of spent fuel assemblies: (1) verify the initial enrichment, burnup, and cooling time of facility declaration; (2) detect the diversion or replacement of pins, (3) estimate the plutonium mass, (4) estimate the decay heat, and (5) determine the reactivity of spent fuel assemblies. This study focuses on spectrally resolved gamma-ray measurements performed on a diverse set of 50 assemblies [25 pressurized water reactor (PWR) assemblies and 25 boiling water reactor (BWR) assemblies]; these same 50 assemblies will be measured with neutron-based NDA instruments and a full-length calorimeter. Given that encapsulation/repository and dry storage safeguards are the primarily intended applications, the analysis focused on the dominant gamma-ray lines of {sup 137}Cs, {sup 154}Eu, and {sup 134}Cs because these isotopes will be the primary gamma-ray emitters during the time frames of interest to these applications. This study addresses the impact on the measured passive gamma-ray signals due to the following factors: burnup, initial enrichment, cooling time, assembly type (eight different PWR and six different BWR fuel designs), presence of gadolinium rods, and anomalies in operating history. To compare the measured results with theory, a limited number of ORIGEN-ARP simulations were performed.

  14. BWR Refill-Reflood Program, Task 4.7 - model development: TRAC-BWR component models

    International Nuclear Information System (INIS)

    Cheung, Y.K.; Parameswaran, V.; Shaug, J.C.

    1983-09-01

    TRAC (Transient Reactor Analysis Code) is a computer code for best-estimate analysis for the thermal hydraulic conditions in a reactor system. The development and assessment of the BWR component models developed under the Refill/Reflood Program that are necessary to structure a BWR-version of TRAC are described in this report. These component models are the jet pump, steam separator, steam dryer, two-phase level tracking model, and upper-plenum mixing model. These models have been implemented into TRAC-B02. Also a single-channel option has been developed for individual fuel-channel analysis following a system-response calculation

  15. Core concept for long operating cycle simplified BWR (LSBWR)

    International Nuclear Information System (INIS)

    Kouji, Hiraiwa; Noriyuki, Yoshida; Mikihide, Nakamaru; Hideaki, Heki; Masanori, Aritomi

    2002-01-01

    An innovative core concept for a long operating cycle simplified BWR (LSBWR) is currently being developed under a Toshiba Corporation and Tokyo Institute of Technology joint study. In this core concept, the combination of enriched uranium oxide fuels and loose-pitched lattice is adopted for an easy application of natural circulation. A combination of enriched gadolinium and 0.7-times sized small bundle with peripheral-positioned gadolinium rod is also adopted as a key design concept for 15-year cycle operation. Based on three-dimensional nuclear and thermal hydraulic calculation, a nuclear design for fuel bundle has been determined. Core performance has been evaluated based on this bundle design and shows that thermal performance and reactivity characteristics meet core design criteria. Additionally, a control rod operation plan for an extension of control rod life has been successfully determined. (author)

  16. Rural Public Transportation Technologies: User Needs and Applications. Final Report

    Science.gov (United States)

    1998-08-01

    The Rural Public Transportation Technologies: User Needs and Applications Study was conducted as part of the U.S. DOT's overall Rural Intelligent Transportation System (ITS) Program. The study examined the opportunities and challenges of planning and...

  17. Rural public transportation technologies : user needs and applications : final report

    Science.gov (United States)

    1998-07-01

    The Rural Public Transportation Technologies: User Needs and Applications study was conducted as part of the U.S. Department of Transportations (DOT) overall Rural Intelligent Transportation System (ITS) Program. The study examined the opportuniti...

  18. Standard technical specifications General Electric plants, BWR/6. Volume 1, Revision 1

    International Nuclear Information System (INIS)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry to produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/6 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved STS or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.10 of the improved STS

  19. Standard technical specifications: General Electric plants, BWR/4. Volume 1, Revision 1: Specifications

    International Nuclear Information System (INIS)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry to produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/4 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved STS or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.10 of the improved STS

  20. Impact of Monoenergetic Photon Sources on Nonproliferation Applications Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Geddes, Cameron [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ludewigt, Bernhard [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Valentine, John [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Quiter, Brian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Descalle, Marie-Anne [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Warren, Glen [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kinlaw, Matt [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thompson, Scott [Idaho National Lab. (INL), Idaho Falls, ID (United States); Chichester, David [Idaho National Lab. (INL), Idaho Falls, ID (United States); Miller, Cameron [Univ. of Michigan, Ann Arbor, MI (United States); Pozzi, Sara [Univ. of Michigan, Ann Arbor, MI (United States)

    2017-03-01

    Near-monoenergetic photon sources (MPSs) have the potential to improve sensitivity at greatly reduced dose in existing applications and enable new capabilities in other applications, particularly where passive signatures do not penetrate or are insufficiently accurate. MPS advantages include the ability to select energy, energy spread, flux, and pulse structures to deliver only the photons needed for the application, while suppressing extraneous dose and background. Some MPSs also offer narrow angular divergence photon beams which can target dose and/or mitigate scattering contributions to image contrast degradation. Current bremsstrahlung photon sources (e.g., linacs and betatrons) produce photons over a broad range of energies, thus delivering unnecessary dose that in some cases also interferes with the signature to be detected and/or restricts operations. Current sources must be collimated (reducing flux) to generate narrow divergence beams. While MPSs can in principle resolve these issues, they remain at relatively low TRL status. Candidate MPS technologies for nonproliferation applications are now being developed, each of which has different properties (e.g. broad vs. narrow angular divergence). Within each technology, source parameters trade off against one another (e.g. flux vs. energy spread), representing a large operation space. This report describes a broad survey of potential applications, identification of high priority applications, and detailed simulations addressing those priority applications. Requirements were derived for each application, and analysis and simulations were conducted to define MPS parameters that deliver benefit. The results can inform targeting of MPS development to deliver strong impact relative to current systems.

  1. Stationary battery guide: Design, application, and maintenance. Final report

    International Nuclear Information System (INIS)

    1997-11-01

    This guide has been prepared to assist a variety of users with stationary battery design, application, and maintenance. The following battery-related topics are discussed in detail: (1) fundamentals--how batteries are designed and how they work; (2) aging, degradation, and failures with an emphasis on how various maintenance tasks can prevent, detect, or repair certain degradation mechanisms; (3) applications--how batteries are designed for a specific purpose and how the battery industry has evolved; (4) sizing for different applications; (5) protection and charging; (6) periodic inspections and checks; (7) capacity discharge testing; (8) installation and replacement considerations; and (9) problems that can occur with battery systems. Since the original guide was published, new IEEE Recommended Practices related to stationary battery applications have been issued. This revision addresses those industry changes as well as some of the emerging issues related to the development of other industry documents. This guide has been prepared as a comprehensive reference source for stationary batteries and is intended to address the design, application, and maintenance needs of users. The technical discussions are at the application level. Fundamentals of battery design are covered in greater detail in this revision. More details related to internal cell materials, their operational relationship, and performance over the expected life of the battery cell are provided. This information has been included because many changes in battery cell materials, manufacturing and design processes are not always communicated to the user

  2. Radiation field control at the latest BWR plants -- design principle, operational experience and future subjects

    Energy Technology Data Exchange (ETDEWEB)

    Uchida, Shunsuke [Energy Research Lab., Ibaraki (Japan); Ohsumi, Katsumi; Takashima, Yoshie [Hitachi Works, Ibaraki (Japan)

    1995-03-01

    Improvements of operational procedures to control water chemistry, e.g., nickel/iron control, as well as application of hardware improvements for reducing radioactive corrosion products resulted in an extremely low occupational exposure of less than 0.5 man.Sv/yr without any serious impact on the radwaste system, for BWR plants involved in the Japanese Improvement and Standardization Program. Recently, {sup 60}C radioactively in the reactor water has been increasing due to less crud fixation on the two smooth surfaces of new type high performance fuels and to the pH drop caused by chromium oxide anions released from stainless steel structures and pipings. This increase must be limited by changes in water chemistry, e.g., applications of modified nickel/iron ratio control and weak alkali control. Controlled water chemistry to optimize three points, the plant radiation level and integrities of fuel and structural materials, is the primary future subject for BWR water chemistry.

  3. Feasibility study on development of plate-type heat exchanger for BWR plants

    International Nuclear Information System (INIS)

    Ohyama, Nobuhiro; Suda, Kenichi; Ogata, Hiroshi; Matsuda, Shinichi; Nagasaka, Kazuhiro; Fujii, Toshi; Nozawa, Toshiya; Ishihama, Kiyoshi; Higuchi, Tomokazu

    2004-01-01

    In order to apply plate-type heat exchanger to RCW, TCW and FPC system in BWR plants, heat test and seismic test of RCW system heat exchanger sample were carried out. The results of these tests showed new design plate-type heat exchanger satisfied the fixed pressure resistance and seismic resistance and keep the function. The evaluation method of seismic design was constructed and confirmed by the results of tests. As anti-adhesion measure of marine organism, an ozone-water circulation method, chemical-feed method and combination of circulation of hot water and air bubbling are useful in place of the chlorine feeding method. Application of the plate-type heat exchanger to BWR plant is confirmed by these investigations. The basic principles, structure, characteristics, application limit and reliability are stated. (S.Y.)

  4. Development of a computerized operator support system for BWR power plant

    International Nuclear Information System (INIS)

    Monta, K.; Sekimizu, K.; Sato, N.; Araki, T.; Mori, N.

    1985-01-01

    A computerized operator support system for BWR power plant has been developed since 1980 supported by the Japanese government. The main functions of the systems are post trip operational guidance, disturbance analysis, standby system management, operational margin monitoring and control rod operational guidance. The former two functions aim at protection against incidents during operation of nuclear power plants and the latter three functions aim at their prevention. As the final stage of the development, these functions are combined with the plant supervision function and are organized as an advanced man-machine interface for BWR power plant. During the above process, operator task analyses are performed to enable synthesis of these support functions for right fit to operator tasks and to realize a hierarchical structure for CRT displays for right fit to operators cognitive needs. (author)

  5. Study on reactor vessel replacement (RVR) for 1100 MW class BWR plants in Japan

    International Nuclear Information System (INIS)

    Mizutani, J.; Kawamura, S.; Aoki, M.; Mori, T.

    2001-01-01

    Plant Life Management (PLM) is being studied in Japan, and reactor vessel replacement (RVR) is being considered as one option. Since reactor internals, except for reusable parts, and the reactor pressure vessel (RPV) are replaced, the RVR provides an effective technology for extending the service life of nuclear power plants substantially. At ICONE 7, we reported on the technical viability of the RVR for BWR4-type 800 MWe class plants. This time, we rationalized the RVR method through a study for BWR5-type 1100 MWe class plants to reduce the RVR duration and evaluated the technical viability and the economic efficiency of the method. In addition, we discuss how to dispose of the RPV to complete a scenario of the process from the RVR to its final disposal. (author)

  6. Superhard nanophase cutter materials for rock drilling applications; FINAL

    International Nuclear Information System (INIS)

    Voronov, O.; Tompa, G.; Sadangi, R.; Kear, B.; Wilson, C.; Yan, P.

    2000-01-01

    The Low Pressure-High Temperature (LPHT) System has been developed for sintering of nanophase cutter and anvil materials. Microstructured and nanostructured cutters were sintered and studied for rock drilling applications. The WC/Co anvils were sintered and used for development of High Pressure-High Temperature (HPHT) Systems. Binderless diamond and superhard nanophase cutter materials were manufactured with help of HPHT Systems. The diamond materials were studied for rock machining and drilling applications. Binderless Polycrystalline Diamonds (BPCD) have high thermal stability and can be used in geothermal drilling of hard rock formations. Nanophase Polycrystalline Diamonds (NPCD) are under study in precision machining of optical lenses. Triphasic Diamond/Carbide/Metal Composites (TDCC) will be commercialized in drilling and machining applications

  7. Plan for advanced microelectronics processing technology application. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  8. Strategies of operation cycles in BWR type reactors

    International Nuclear Information System (INIS)

    Molina, D.; Sendino, F.

    1996-01-01

    The article analyzes the operation cycles in BWR type reactors. The cycle size of operation is the consequence on the optimization process of the costs with the technical characteristics of nuclear fuel and the characteristics of demand and production. The authors analyze the cases of Garona NP and Cofrentes NP, both with BWR reactors. (Author)

  9. GPE-BWR and the containment venting and filtering issue

    International Nuclear Information System (INIS)

    Palomo, J.; Santiago, J. de

    1988-01-01

    The Spanish Boiling Water Reactor Owner's Group (GPE-BWR) is formed by three utilities, owning four units: Santa Maria de Garona (46 MWe, BWR3, Mark I containment), Cofrentes (975 MWe, BWR6, Mark III containment) and Valdecaballeros (2x975 MWe, BWR6, Mark III containment) - all of the reactors having been supplied by General Electric. One of the GPE-BWR's several committees is the Safety and Licensing Committee, which follows up the evolution of severe accident topics and particularly the containment venting and filtering issue. In September 1987, the Consejo de Seguridad Nuclear (CSN), the Spanish Regulatory Body, asked the GPE-BWR to define its position on the installation of a containment venting system. The GPE-BWR created a Working Group which presented a Report on Containment Venting to the CSN in January 1987 gathered from: the US Nuclear Regulatory Commission (NRC); some US utilities; and several European countries, especially France, Germany and Sweden. CSN's review of the containment venting Report and the Action Plan proposed by the GPE-BWR finished in April 1988. The conclusion of the Report and the proposed Action Plan take into account the US NRC's identified open items on severe accidents and the R and D programs scheduled to close these items

  10. Comparison of generic BWR-MSIV configurations. Final report

    International Nuclear Information System (INIS)

    Webber, A.H.

    1982-06-01

    This report describes the comprehensive testing and offers the appropriate corrective actions that pertain to the 26-inch Y-pattern Main Steam Isolation Valve (MSIV). These corrective actions are intended to improve the valve performance capability in achieving the seat leakage requirements of the Local Leak Rate Test (LLRT). The LLRT is imposed by regulatory requirements and is conducted during refuelling outages. A test and measurement program was developed to investigate the contributory factors involved in valve leakage and a specially designed Seat Distortion Measuring Tool (SDMT), provided by the General Electric Company, facilitated measurements of the MSIV's poppet and pilot valve seat surfaces. The results of the tests support the design and functional integrity of the MSIV when operated at normal plant site loads and where a diligent maintenance program is employed

  11. Solair heater program: solair applications study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-12-01

    General Electric has designed and tested a low-cost solar system using a vacuum tube solar air heater under ERDA Contract E(11-1)-2705. This contract extension has been provided to evaluate various applications of this solar collector. The evaluation identified attractive applications, evaluated corresponding control procedures, estimated system performance, compared economically insolation and insulation, and evaluated the repackaging of off-the-shelf equipment for improved cost effectiveness. The results of this study prompted General Electric's marketing group to do a detailed commercialization study of a residential domestic water heating system using the Solair concept which has been selected as the most attractive application. Other attractive applications are space/domestic water heating and a heat pump assisted solar system/domestic water heating where the heat pump and the solar system function in parallel. A prime advantage of heated air solar systems over liquid systems is cost and longer life which results in higher BTU's/dollar. Other air system advantages are no liquid leakage problems, no toxicity of freezing problems, and less complicated equipment. A hybrid solar system has been identified that can improve the market penetration of solar energy. This system would use the existing mass of the house for energy storage thereby reducing solar cost and complexity. Adequate performance can be obtained with house temperature swings comparable to those used in nighttime setback of the thermostat. Details of this system are provided.

  12. Research Applications for Teaching (RAFT) Project. Final Report.

    Science.gov (United States)

    Thomson, James R., Jr.; Handley, Herbert M.

    A report is given of the development and progress of the Research Applications for Teaching (RAFT) project, developed at Mississippi State University. Based upon research findings relative to effective teaching and effective schooling, five curriculum modules were prepared and implemented in instruction. In the second year of the project the…

  13. Final Report: Migration Mechanisms for Large-scale Parallel Applications

    Energy Technology Data Exchange (ETDEWEB)

    Jason Nieh

    2009-10-30

    Process migration is the ability to transfer a process from one machine to another. It is a useful facility in distributed computing environments, especially as computing devices become more pervasive and Internet access becomes more ubiquitous. The potential benefits of process migration, among others, are fault resilience by migrating processes off of faulty hosts, data access locality by migrating processes closer to the data, better system response time by migrating processes closer to users, dynamic load balancing by migrating processes to less loaded hosts, and improved service availability and administration by migrating processes before host maintenance so that applications can continue to run with minimal downtime. Although process migration provides substantial potential benefits and many approaches have been considered, achieving transparent process migration functionality has been difficult in practice. To address this problem, our work has designed, implemented, and evaluated new and powerful transparent process checkpoint-restart and migration mechanisms for desktop, server, and parallel applications that operate across heterogeneous cluster and mobile computing environments. A key aspect of this work has been to introduce lightweight operating system virtualization to provide processes with private, virtual namespaces that decouple and isolate processes from dependencies on the host operating system instance. This decoupling enables processes to be transparently checkpointed and migrated without modifying, recompiling, or relinking applications or the operating system. Building on this lightweight operating system virtualization approach, we have developed novel technologies that enable (1) coordinated, consistent checkpoint-restart and migration of multiple processes, (2) fast checkpointing of process and file system state to enable restart of multiple parallel execution environments and time travel, (3) process migration across heterogeneous

  14. Propagation of cracks by stress corrosion in conditions of BWR type reactor

    International Nuclear Information System (INIS)

    Merino C, F.J.; Fuentes C, P.

    2004-01-01

    In this work, the obtained results when applying the Hydrogen Chemistry to a test tube type Compact Tension (CT), built in austenitic stainless steel 304l, simulating the conditions to those that it operates a Boiling Water Reactor (BWR), temperature 288 C and pressure of 8 MPa are presented. With the application of this water chemistry, seeks to be proven the diminution of the crack propagation speed. (Author)

  15. A probabilistic analysis of PWR and BWR fuel rod performance using the code CASINO-SLEUTH

    International Nuclear Information System (INIS)

    Bull, A.J.

    1987-01-01

    This paper presents a brief description of the Monte Carlo and response surface techniques used in the code, and a probabilistic analysis of fuel rod performance in PWR and BWR applications. The analysis shows that fission gas release predictions are very sensitive to changes in certain of the code's inputs, identifies the most dominant input parameters and compares their effects in the two cases. (orig./HP)

  16. Efficient method for simulation of BWR severe accident sequence events before core uncovery

    International Nuclear Information System (INIS)

    Harrington, R.M.

    1984-01-01

    BWR-LACP has been a versatile tool for the ORNL SASA program. The development effort was minimal, and the code is fast running and economical. Operator actions are easily simulated and the complete scope of both reactor vessel and primary containment are modeled. Valuable insights have been gained into accident sequences. A Fortran version is under development and it will be modified for application to Mark II plants

  17. An advanced frequency-domain code for boiling water reactor (BWR) stability analysis and design

    International Nuclear Information System (INIS)

    Behrooz, A.

    2008-01-01

    for a large reactor could reach 20 gigabytes) that it is not possible to load into RAM memory of an operating system with 32 bit architecture. A special procedure has been developed within the MATLAB environment to remove this memory limitation, and to invert such large matrices and finally obtain the reactor transfer functions that enable the study of system stability. Various applications of the present frequency-domain code to a typical BWR fuel assembly, a BWR core, and to a chemical reactor showed a good agreement with reference results. (author)

  18. Hydrothermal Carbonization: Modeling, Final Properties Design and Applications: A Review

    Directory of Open Access Journals (Sweden)

    Silvia Román

    2018-01-01

    Full Text Available Active research on biomass hydrothermal carbonization (HTC continues to demonstrate its advantages over other thermochemical processes, in particular the interesting benefits that are associated with carbonaceous solid products, called hydrochar (HC. The areas of applications of HC range from biofuel to doped porous material for adsorption, energy storage, and catalysis. At the same time, intensive research has been aimed at better elucidating the process mechanisms and kinetics, and how the experimental variables (temperature, time, biomass load, feedstock composition, as well as their interactions affect the distribution between phases and their composition. This review provides an analysis of the state of the art on HTC, mainly with regard to the effect of variables on the process, the associated kinetics, and the characteristics of the solid phase (HC, as well as some of the more studied applications so far. The focus is on research made over the last five years on these topics.

  19. Prevention of organic iodide formation in BWR's

    International Nuclear Information System (INIS)

    Karjunen, T.; Laitinen, T.; Piippo, J.; Sirkiae, P.

    1996-01-01

    During an accident, many different forms of iodine may emerge. Organic iodides, such as methyl iodide and ethyl iodide, are relatively volatile, and thus their appearance leads to increased concentration of gaseous iodine. Since organic iodides are also relatively immune to most accident mitigation measures, such as sprays and filters, they can affect the accident source term significantly even when only a small portion of iodine is in organic form. Formation of organic iodides may not be limited by the amount of organic substances available. Excessive amounts of methane can be produced, for example, during oxidation of boron carbide, which is used in BWR's as a neutron absorber material. Another important source is cable insulation. In a BWR, a large quantity of cables is placed below the pressure vessel. Thus a large quantity of pyrolyse gases will be produced, should the vessel fail. Organic iodides can be formed as a result of many different reactions, but at least in certain conditions the main reaction takes place between an organic radical produced by radiolysis and elemental iodine. A necessary requirement for prevention of organic iodide production is therefore that the pH in the containment water pools is kept high enough to eliminate formation of elemental iodine. In a typical BWR the suppression pool water is usually unbuffered. As a result, the pH may be dominated by chemicals introduced during an accident. If no system for adding basic chemicals is operable, the main factor affecting pool water pH may be hydrochloric acid released during cable degradation. Should this occur, the conditions could be very favorable for production of elemental iodine and, consequently, formation of organic iodides. Although high pH is necessary for iodine retention, it could have also adverse effects. High pH may, for example, accelerate corrosion of containment materials and alter the characteristics of the solid corrosion products. (author) 6 figs., 1 tab., 13 refs

  20. Summary report of seismic PSA of BWR model plant

    International Nuclear Information System (INIS)

    1999-05-01

    This report presents a seismic PSA (Probabilistic Safety Assessment) methodology developed at the Japan Atomic Energy Research Institute (JAERI) for evaluating risks of nuclear power plants (NPPs) and the results from an application of the methodology to a BWR plant in Japan, which is termed Model Plant'. The seismic PSA procedures developed at JAERI are to evaluate core damage frequency (CDF) and have the following four steps: (1) evaluation of seismic hazard, (2) evaluation of realistic response, (3) evaluation of component capacities and failure probabilities, and (4) evaluation of conditional probability of system failure and CDF. Although these procedures are based on the methodologies established and used in the United States, they include several unique features: (1) seismic hazard analysis is performed with use of available knowledge and database on seismological conditions in Japan; (2) response evaluation is performed with a response factor method which is cost effective and associated uncertainties can be reduced with use of modern methods of design calculations; (3) capacity evaluation is performed with use of test results available in Japan in combination with design information and generic capacity data in the U.S.A.; (4) systems reliability analysis, performed with use of the computer code SECOM-2 developed at JAERI, includes identification of dominant accident sequences, importance analysis of components and systems as well as the CDF evaluation with consideration of the effect of correlation of failures by a newly developed method based on the Monte Carlo method. The effect of correlation has been recognized as an important issue in seismic PSAs. The procedures was used to perform a seismic PSA of a 1100 MWe BWR plant. Results are shown as well as the insights derived and future research needs identified in this seismic PSA. (J.P.N.)

  1. A simplified spatial model for BWR stability

    International Nuclear Information System (INIS)

    Berman, Y.; Lederer, Y.; Meron, E.

    2012-01-01

    A spatial reduced order model for the study of BWR stability, based on the phenomenological model of March-Leuba et al., is presented. As one dimensional spatial dependence of the neutron flux, fuel temperature and void fraction is introduced, it is possible to describe both global and regional oscillations of the reactor power. Both linear stability analysis and numerical analysis were applied in order to describe the parameters which govern the model stability. The results were found qualitatively similar to past results. Doppler reactivity feedback was found essential for the explanation of the different regions of the flow-power stability map. (authors)

  2. Level 2 PRA for a German BWR

    International Nuclear Information System (INIS)

    Sassen, F.; Rapp, W.; Tietsch, W.; Roess, P.

    2007-01-01

    A concept for a Level 2 Probabilistic Risk Assessment (L2 PRA) for a German Boiling Water Reactor (BWR) has been developed taking into account the role of L2 PRA within the German regulatory landscape. According to this concept, a plant specific evaluation of the severe accident phenomenology as well as analyses of the accident progression for the severe accident scenarios has been performed. Furthermore a plant specific MELCOR 1.8.6 model has been developed and special MELCOR source term calculations have been performed for the different release paths. This paper will present examples from the different areas described above. (author)

  3. Recycling systems for BWR type reactors

    International Nuclear Information System (INIS)

    Takagi, Akio; Yamamoto, Fumiaki; Fukumoto, Ryuji.

    1986-01-01

    Purpose: To stabilize the coolant flowing characteristics and reactor core reactivity. Constitution: The recycling system in a BWR type reactor comprises a recycling pump disposed to the outside of a reactor pressure vessel, a ring header connected to the recycling pump through main pipe ways, and a plurality of pipes branched from and connected with the ring header and connected to a plurality of jet pumps within the pressure vessel. Then, by making the diameter for the pipeways of each of the branched pipes different from each other, the effective cross-sectional area is varied to thereby average the coolant flow rate supplied to each of the jet pumps. (Seki, T.)

  4. Maintenance of BWR control rod drive mechanisms

    International Nuclear Information System (INIS)

    Greene, R.H.

    1991-01-01

    Control rod drive mechanism (CRDM) replacement and rebuilding is one of the highest dose, most physically demanding, and complicated maintenance activities routinely accomplished by BWR utilities. A recent industry workshop sponsored by the Oak Ridge National Laboratory, which dealt with the effects of CRDM aging, revealed enhancements in maintenance techniques and tooling which have reduced ALARA, improved worker comfort and productivity, and have provided revised guidelines for CRDM changeout selection. Highlights of this workshop and ongoing research on CRDM aging are presented in this paper

  5. Development of Advanced Polymeric Reflector for CSP Applications - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Treglio, Richard, T; Boyle, Keith, A; Henderson, Hildie

    2013-03-28

    This project attempted to deposit extremely thick and dense protective barrier onto a mirror film stack with a PET substrate. The target thickness was very high for thin film products; particularly since large areas and long production lengths of film are needed to make the final product economic. The technical investigations in this project centered on maintaining a quality barrier (i.e. dense film) while evaporating alumina with a high deposition rate onto a low cost PET substrate. The project found that the proposed configuration, particularly direct ion bombardment, provides too narrow a solution space to effectively and economically produce the ASRM attempted. The initial project goals were met when depositing on a limited width and at a modest rate. However, expanding to wide deposition at aggressive deposition rates did not produce consistent film quality. Economic viability drives the process to maximize deposition rate. The current system configuration has a limiting upper rate threshold that does not appear economically viable. For future work, alternate approaches seem needed to address the challenges encountered in the scale-up phase of this project.

  6. Siting guidelines for utility application of wind turbines. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Pennell, W.T.

    1983-01-01

    Utility-oriented guidelines are described for identifying viable sites for wind turbines. Topics and procedures are also discussed that are important in carrying out a wind turbine siting program. These topics include: a description of the Department of Energy wind resource atlases; procedures for predicting wind turbine performance at potential sites; methods for analyzing wind turbine economics; procedures for estimating installation and maintenance costs; methods for anlayzing the distribution of wind resources over an area; and instrumentation for documenting wind behavior at potential sites. The procedure described is applicable to small and large utilities. Although the procedure was developed as a site-selection tool, it can also be used by a utility who wishes to estimate the potential for wind turbine penetration into its future generation mix.

  7. SIAM conference on inverse problems: Geophysical applications. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This conference was the second in a series devoted to a particular area of inverse problems. The theme of this series is to discuss problems of major scientific importance in a specific area from a mathematical perspective. The theme of this symposium was geophysical applications. In putting together the program we tried to include a wide range of mathematical scientists and to interpret geophysics in as broad a sense as possible. Our speaker came from industry, government laboratories, and diverse departments in academia. We managed to attract a geographically diverse audience with participation from five continents. There were talks devoted to seismology, hydrology, determination of the earth`s interior on a global scale as well as oceanographic and atmospheric inverse problems.

  8. Heat pumps for geothermal applications: availability and performance. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Reistad, G.M.; Means, P.

    1980-05-01

    A study of the performance and availability of water-source heat pumps was carried out. The primary purposes were to obtain the necessary basic information required for proper evaluation of the role of water-source heat pumps in geothermal energy utilization and/or to identify the research needed to provide this information. The Search of Relevant Literature considers the historical background, applications, achieved and projected performance evaluations and performance improvement techniques. The commercial water-source heat pump industry is considered in regard to both the present and projected availability and performance of units. Performance evaluations are made for units that use standard components but are redesigned for use in geothermal heating.

  9. Solid oxide fuel cells towards real life applications. Final report

    Energy Technology Data Exchange (ETDEWEB)

    2010-07-01

    Solid Oxide Fuel Cells offer a clean and efficient way of producing electricity and heat from a wide selection of fuels. The project addressed three major challenges to be overcome by the technology to make commercialisation possible. (1) At the cell level, increased efficiency combined with production cost reduction has been achieved through an optimization of the manufacturing processes, b) by using alternative raw materials with a lower purchase price and c) by introducing a new generation of fuel cells with reduced loss and higher efficiency. (2) At the stack level, production cost reduction is reduced and manufacturing capacity is increased through an optimization of the stack production. (3) At the system level, development of integrated hotbox concepts for the market segments distributed generation (DG), micro combined heat and power (mCHP), and auxiliary power units (APU) have been developed. In the mCHP segment, two concepts have been developed and validated with regards to market requirements and scalability. In the APU-segment, different types of reformers have been tested and it has been proven that diesel can be reformed through appropriate reformers. Finally, operation experience and feedback has been gained by deployment of stacks in the test facility at the H.C. OErsted Power Plant (HCV). This demonstration has been carried out in collaboration between TOFC and DONG Energy Power A/S (DONG), who has participated as a subcontractor to TOFC. The demonstration has given valuable knowledge and experience with design, start-up and operation of small power units connected to the grid and future development within especially the mCHP segment will benefit from this. In this report, the project results are described for each of the work packages in the project. (Author)

  10. Experimental study on reduced moderation BWR with Advanced Recycle System (BARS)

    International Nuclear Information System (INIS)

    Hiraiwa, K.; Yoshioka, K.; Yamamoto, Y.; Akiba, M.; Yamaoka, M.; Abe, N.; Mimatsu, J.

    2004-01-01

    Experimental study has been done for reduced-moderation spectrum boiling water reactor named BARS (BWR with Advanced Recycle System). The critical assembly experiment for triangular tight uranium lattice has been done in TOSHIBA critical assembly (NCA). Experimental method based on modified conversion ratio was adopted to evaluate the void reactivity effect. Void fraction was simulated by formed polystyrene in this experiment. The measured void coefficient for tight uranium lattice agreed with calculation. The thermal hydraulic test study has been done to study the coolability of BARS lattice. Visual test and high-pressure thermal hydraulic test have been done as the thermal hydraulic test. Visual test has indicated the flow behavior for BARS lattice is same as that of current BWR. The high-pressure thermal hydraulic test has indicated the applicability of modified Arai's correlation to the BARS lattice. (authors)

  11. Development of membrane moisture separator for BWR off-gas system

    International Nuclear Information System (INIS)

    Ogata, H.; Kawamura, S.; Kumasaka, M.; Nishikubo, M.

    2001-01-01

    In BWR plant off-gas treatment systems, dehumidifiers are used to maintain noble gas adsorption efficiency in the first half of the charcoal hold-up units. From the perspective of simplifying and reducing the cost of such a dehumidification system, Japanese BWR utilities and plant fabricators have been developing a dehumidification system employing moisture separation membrane of the type already proven in fields such as medical instrumentation and precision measuring apparatus. The first part of this development involved laboratory testing to simulate the conditions found in an actual off-gas system, the results of which demonstrated satisfactory results in terms of moisture separation capability and membrane durability, and suggested favorable prospects for application in actual off-gas systems. Further, in-plant testing to verify moisture separation capability and membrane durability in the presence of actual gases is currently underway, with results so far suggesting that the system is capable of obtaining good moisture separation capability. (author)

  12. Fission product model for BWR analysis with improved accuracy in high burnup

    International Nuclear Information System (INIS)

    Ikehara, Tadashi; Yamamoto, Munenari; Ando, Yoshihira

    1998-01-01

    A new fission product (FP) chain model has been studied to be used in a BWR lattice calculation. In attempting to establish the model, two requirements, i.e. the accuracy in predicting burnup reactivity and the easiness in practical application, are simultaneously considered. The resultant FP model consists of 81 explicit FP nuclides and two lumped pseudo nuclides having the absorption cross sections independent of burnup history and fuel composition. For the verification, extensive numerical tests covering over a wide range of operational conditions and fuel compositions have been carried out. The results indicate that the estimated errors in burnup reactivity are within 0.1%Δk for exposures up to 100GWd/t. It is concluded that the present model can offer a high degree of accuracy for FP representation in BWR lattice calculation. (author)

  13. Phenomenology of BWR fuel assembly degradation

    Science.gov (United States)

    Kurata, Masaki; Barrachin, Marc; Haste, Tim; Steinbrueck, Martin

    2018-03-01

    Severe accidents occurred at the Fukushima-Daiichi Nuclear Power Station (FDNPS) which required an immediate re-examination of fuel degradation phenomenology. The present paper reviews the updated knowledge on the phenomenology of the fuel degradation, focusing mainly on the BWR fuel assembly degradation at the macroscopic scale and that of the individual interactions at the meso-scale. Oxidation of boron carbide (B4C) control rods potentially generates far larger amounts of heat and hydrogen under BWR accident conditions. All integral tests with B4C control rods or control blades have shown early failure, liquefaction, relocation and oxidation of B4C starting at temperatures around 1250 °C, well below the significant interaction temperatures of UO2-Zry. These interactions or reactions potentially influence the progress of fuel degradation in the early phase. The steam-starved conditions, which are being discussed as a likely scenario at the FDNPS accident, highly influence the individual interactions and potentially lead the fuel degradation in non-prototypical directions. The detailed phenomenology of individual interactions and their influence on the transient and on the late phase of the severe accidents are also discussed.

  14. BWR normal water chemistry guidelines: 1986 revision

    International Nuclear Information System (INIS)

    1988-09-01

    Boiling water reactors (BWRs) have experienced stress corrosion cracking in the reactor cooling system piping resulting in adverse impacts on plant availability and personnel radiation exposure. The BWR Owners Group and EPRI have sponsored a major research and development program to provide remedies for this stress corrosion cracking problem. This work shows that the likelihood of cracking depends on the plant's water chemistry performance (environment) as well as on material condition and stress level. Plant experience and other research demonstrate that water quality also affects fuel performance and radiation field buildup in BWRs. This report,''BWR Normal Water Chemistry Guidelines: 1986 Revision,'' presents suggested generic water chemistry specifications, justifies the proposed water chemistry limits, suggests responses to out-of-specification water chemistry, discusses available chemical analysis methods as well as data management and surveillance schemes, and details the management philosophy required to successfully implement a water chemistry control program. An appendix contains recommendations for water quality of auxiliary systems. 73 refs., 20 figs., 9 tabs

  15. BWR Assembly Optimization for Minor Actinide Recycling

    International Nuclear Information System (INIS)

    Maldonado, G. Ivan; Christenson, John M.; Renier, J.P.; Marcille, T.F.; Casal, J.

    2010-01-01

    The Primary objective of the proposed project is to apply and extend the latest advancements in LWR fuel management optimization to the design of advanced boiling water reactor (BWR) fuel assemblies specifically for the recycling of minor actinides (MAs). A top-level objective of the Advanced Fuel Cycle Systems Analysis program element of the DOE NERI program is to investigate spent fuel treatment and recycling options for current light water reactors (LWRs). Accordingly, this project targets to expand the traditional scope of nuclear fuel management optimization into the following two complementary specific objectives: (1) To develop a direct coupling between the pin-by-pin within-bundle loading control variables and core-wide (bundle-by-bundle) optimization objectives, (2) to extend the methodology developed to explicitly encompass control variables, objectives, and constraints designed to maximize minor actinide incineration in BWR bundles and cycles. The first specific objective is projected to 'uncover' dormant thermal margin made available by employing additional degrees of freedom within the optimization process, while the addition of minor actinides is expected to 'consume' some of the uncovered thermal margin. Therefore, a key underlying goal of this project is to effectively invest some of the uncovered thermal margin into achieving the primary objective.

  16. Recent BWR fuel management reactor physics advances

    International Nuclear Information System (INIS)

    Crowther, R.L.; Congdon, S.P.; Crawford, B.W.; Kang, C.M.; Martin, C.L.; Reese, A.P.; Savoia, P.J.; Specker, S.R.; Welchly, R.

    1982-01-01

    Improvements in BWR fuel management have been under development to reduce uranium and separative work (SWU) requirements and reduce fuel cycle costs, while also maintaining maximal capacity factors and high fuel reliability. Improved reactor physics methods are playing an increasingly important role in making such advances feasible. The improved design, process computer and analysis methods both increase knowledge of the thermal margins which are available to implement fuel management advance, and improve the capability to reliably and efficiently analyze and design for fuel management advances. Gamma scan measurements of the power distributions of advanced fuel assembly and advanced reactor core designs, and improved in-core instruments also are important contributors to improving 3-d predictive methods and to increasing thermal margins. This paper is an overview of the recent advances in BWR reactor physics fuel management methods, coupled with fuel management and core design advances. The reactor physics measurements which are required to confirm the predictions of performance fo fuel management advances also are summarized

  17. CECP, Decommissioning Costs for PWR and BWR

    International Nuclear Information System (INIS)

    Bierschbach, M.C.

    1997-01-01

    1 - Description of program or function: The Cost Estimating Computer Program CECP, designed for use on an IBM personal computer or equivalent, was developed for estimating the cost of decommissioning boiling water reactor (BWR) and light-water reactor (PWR) power stations to the point of license termination. 2 - Method of solution: Cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial volume and costs; and manpower staffing costs. Using equipment and consumables costs and inventory data supplied by the user, CECP calculates unit cost factors and then combines these factors with transportation and burial cost algorithms to produce a complete report of decommissioning costs. In addition to costs, CECP also calculates person-hours, crew-hours, and exposure person-hours associated with decommissioning. 3 - Restrictions on the complexity of the problem: The program is designed for a specific waste charge structure. The waste cost data structure cannot handle intermediate waste handlers or changes in the charge rate structures. The decommissioning of a reactor can be divided into 5 periods. 200 different items for special equipment costs are possible. The maximum amount for each special equipment item is 99,999,999$. You can support data for 10 buildings, 100 components each; ESTS1071/01: There are 65 components for 28 systems available to specify the contaminated systems costs (BWR). ESTS1071/02: There are 75 components for 25 systems available to specify the contaminated systems costs (PWR)

  18. BWR-stability investigation at Forsmark 1

    International Nuclear Information System (INIS)

    Bergdahl, B.G.; Reisch, F.; Oguma, R.; Lorenzen, J.; Aakerhielm, F.

    1988-01-01

    A series of noise measurements have been conducted at Forsmark 1 during start-up operation after the revision summer '87. The main purpose was to investigate BWR-stability problems, i.e. resonant power oscillations of 0.5 Hz around 65% power and 4100 kg/s core flow, which tend to arise at high power and low core flow conditions. The analysis was performed to estimate the noise source which gives rise to the oscillation, to evaluate the measure of stability, i.e. the Decay Ratio (Dr) as well as to investigate other safety related problems. The result indicates that the oscillation is due to the dynamic coupling between the neutron kinetics and thermal hydraulics via void reactivity feedback. The Dr ranged between values of 0.7 and > 0.9, instead of expected 0.6 (Dr=1 is defined as instability). These high values imply that the core cannot suppress oscillations fast enough and a small perturbation can cause scram. Further it was found that the entire core is oscillating in phase (LPRM's) with varying strength where any connection to the consequences of different fuel (8x8, 9x9) being present simultaneously cannot be excluded. This report elucidates the importance of an on-line BWR-stability surveillance system with functions like stability condition monitoring and control system diagnosis. (orig.)

  19. Hydrogen injection device in BWR type reactor

    International Nuclear Information System (INIS)

    Takagi, Jun-ichi; Kubo, Koji.

    1988-01-01

    Purpose: To reduce the increasing ratio of main steam system dose rate due to N-16 activity due to excess hydrogen injection in the hydrogen injection operation of BWR type reactors. Constitution: There are provided a hydrogen injection mechanism for injecting hydrogen into primary coolants of a BWR type reactor, and a chemical injection device for injecting chemicals such as methanol, which makes nitrogen radioisotopes resulted in the reactor water upon hydrogen injection non-volatile, into the pressure vessel separately from hydrogen. Injected hydrogen and the chemicals are not reacted in the feedwater system, but the reaction proceeds due to the presence of radioactive rays after the injection into the pressure vessel. Then, hydrogen causes re-combination in the downcomer portion to reduce the dissolved oxygen concentration. Meanwhile, about 70 % of the chemicals is supplied by means of a jet pump directly to the reactor core, thereby converting the chemical form of N-16 in the reactor core more oxidative (non-volatile). (Kawakami, Y.)

  20. BWR fuel experience with zinc injection

    International Nuclear Information System (INIS)

    Levin, H.A.; Garcia, S.E.

    1995-01-01

    In 1982 a correlation between low primary recirculation system dose rates in BWR's and the presence of ionic zinc in reactor water was identified. The source of the zinc was primarily from Admiralty brass condensers. Plants with brass condensers are called ''natural zinc'' plants. Brass condensers were also a source of copper that was implicated in crude induced localized corrosion (CILC) fuel failures. In 1986 the first BWR intentionally injected zinc for the benefits of dose rate control. Although zinc alone was never implicated in fuel degradation of failures, a comprehensive fuel surveillance program was initiated to monitor fuel performance. Currently there are 14 plants that are injecting zinc. Six of these plants are also on hydrogen water chemistry. This paper describes the effect on both Zircaloy corrosion and the cruding characteristics as a result of these changes in water chemistry. Fuel rod corrosion was found to be independent of the specific water chemistry of the plants. The corrosion behavior was the same with the additions of zinc alone or zinc plus hydrogen and well within the operating experience for fuel without either of these additions. No change was observed in the amounts of crude deposited on the fuel rods, both for the adherent and loosely held deposits. One of the effects of the zinc addition was the trend to form more of the zinc rich iron spinel in the fuel deposits rather than the hematite deposits that are predominantly formed with non additive water chemistry

  1. Identification and assessment of BWR in-vessel severe accident mitigation strategies

    International Nuclear Information System (INIS)

    Hodge, S.A.; Cleveland, J.C.; Kress, T.S.; Petek, M.

    1992-10-01

    This report provides the results of work carried out in support of the US Nuclear Regulatory Commission Accident Management Research Program to develop a technical basis for evaluating the effectiveness and feasibility of current and proposed strategies for boiling water reactor (BWR) severe accident management. First, the findings of an assessment of the current status of accident management strategies for the mitigation of in-vessel events for BWR severe accident sequences are described. This includes a review of the BWR Owners' Group Emergency Procedure Guidelines (EPGSs) to determine the extent to which they currently address the characteristic events of an unmitigated severe accident and to provide the basis for recommendations for enhancement of accident management procedures. Second, where considered necessary, new candidate accident management strategies are proposed for mitigation of the late-phase (after core damage has occurred) events. Finally, recommendations are made for consideration of additional strategies where warranted, and two of the four candidate strategies identified by this effort are assessed in detail: (1) preparation of a boron solution for reactor vessel refill should control blade damage occur during a period of temporary core dryout and (2) containment flooding to maintain the core debris within the reactor vessel if the injection systems cannot be restored

  2. Identification and assessment of BWR in-vessel severe accident mitigation strategies

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, S.A.; Cleveland, J.C.; Kress, T.S.; Petek, M. [Oak Ridge National Lab., TN (United States)

    1992-10-01

    This report provides the results of work carried out in support of the US Nuclear Regulatory Commission Accident Management Research Program to develop a technical basis for evaluating the effectiveness and feasibility of current and proposed strategies for boiling water reactor (BWR) severe accident management. First, the findings of an assessment of the current status of accident management strategies for the mitigation of in-vessel events for BWR severe accident sequences are described. This includes a review of the BWR Owners` Group Emergency Procedure Guidelines (EPGSs) to determine the extent to which they currently address the characteristic events of an unmitigated severe accident and to provide the basis for recommendations for enhancement of accident management procedures. Second, where considered necessary, new candidate accident management strategies are proposed for mitigation of the late-phase (after core damage has occurred) events. Finally, recommendations are made for consideration of additional strategies where warranted, and two of the four candidate strategies identified by this effort are assessed in detail: (1) preparation of a boron solution for reactor vessel refill should control blade damage occur during a period of temporary core dryout and (2) containment flooding to maintain the core debris within the reactor vessel if the injection systems cannot be restored.

  3. Dish/Stirling for Department of Defense applications final report

    Energy Technology Data Exchange (ETDEWEB)

    Diver, R.B.; Menicucci, D.F. [Sandia National Labs., Albuquerque, NM (United States). Energy and Environment Div.

    1997-03-01

    This report describes a Strategic Environmental Research and Development Program (SERDP) project to field a dish/Stirling system at a southwestern US military facility. This project entitled ``Dish/Stirling for DoD Applications`` was started in August 1993 and was completed in September 1996. The project`s objective was to assist military facilities to field and evaluate emerging environmentally sound and potentially economical dish/Stirling technology. Dish/Stirling technology has the potential to produce electricity at competitive costs while at the same time providing a secure and environmentally benign source of power. In accordance with the SERDP charter, this project leveraged a US Department of Energy (DOE) cost-shared project between Sandia National Laboratories and Cummins Power Generation, Inc. (CPG). CPG is a wholly owned subsidiary of Cummins Engine Company, a leading manufacturer of diesel engines. To accomplish this objective, the project called for the installation of a dish/Stirling system at a military facility to establish first-hand experience in the operation of a dish/Stirling system. To scope the potential DoD market for dish/Stirling technology and to identify the site for the demonstration, a survey of southwestern US military facilities was also conducted. This report describes the project history, the Cummins dish/Stirling system, results from the military market survey, and the field test results.

  4. APPRAISAL OF FINAL TAILINGS APPLICABILITY FOR PROCESSING AND PRODUCTION OF MODIFIERS OF IRON-CARBON ALLOYS

    Directory of Open Access Journals (Sweden)

    A. S. Panasugin

    2011-01-01

    Full Text Available The methodology of rating of the galvanic final tailings applicability for further processing in the interests of needs of metallurgical production of the Republic Belarus is offered.

  5. Applications in soil-structure interactions. Final report, June 1979

    International Nuclear Information System (INIS)

    Jhaveri, D.P.

    1979-01-01

    Complex phenomenon of soil-structure interaction was assessed. Relationships between the characteristics of the earthquake ground motions, the local soil and geologic conditions, and the response of the structures to the ground motions were studied. (I) The use of the explicit finite-difference method to study linear elastic soil-structure interaction is described. A linear two-dimensional study of different conditions that influence the dynamic compliance and scattering properties of foundations is presented. (II) The FLUSH computer code was used to compute the soil-structure interaction during SIMQUAKE 1B, an experimental underground blast excitation of a 1/12-scale model of a nuclear containment structure. Evaluation was performed using transient excitation, applied to a finite-difference grid. Dynamic foundation properties were studied. Results indicate that the orientation and location of the source relative to the site and the wave environment at the site may be important parameters to be considered. Differences between the computed and experimental recorded responses are indicated, and reasons for the discrepancy are suggested. (III) A case study that examined structural and ground response data tabulated and catalogued from tests at the Nevada Test Site for its applicability to the soil-structure interaction questions of interest is presented. Description, methods, and evaluation of data on soil-structure interaction from forced vibration tests are presented. A two-dimensional finite-difference grid representing a relatively rigid structure resting on uniform ground was analyzed and monitored. Fourier spectra of monitored time histories were also evaluated and are presented. Results show clear evidence of soil-structure interaction and significant agreement with theory. 128 figures, 18 tables

  6. Case study applications of venture analysis: fluidized bed. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mosle, R.

    1978-05-01

    In order to appraise the case for government intervention in the case of atmospheric fluid-bed combustion, Energy Resources Company and Rotan Mosle have developed a methodology containing four key elements. The first is an economic and environmental characterization of the new technology; the second, a survey of its prospective users and vendors; the third, a cost-benefit analysis of its prospective social benefits; and the fourth, an analytical model of its market penetration and the effects thereon of a basket of government incentives. Three major technical obstacles exist to continued AFBC development: feeding coal and limestone reliably to the boiler, tube erosion and corrosion, and developing boiler turndown capability. The review of the economic, environmental and technical attributes of the new technology has suggested that the preliminary venture can be selected with confidence as a commercial prospect capable of detailed evaluation from both private and public perspectives. The venture choice can therefore be considered firm: it will be the equipment required for the combustion of coal in atmospheric fluid beds as applied to industrial process steam in boilers of at least 83 Kpph capacity. The most effective demonstration of the potential of AFBC in the eyes of prospective industrial users is that provided by a project conducted by the private sector with minimal government direction. Unlike the ''experimental'' style of existing mixed public-private demonstration projects, the pressure to achieve reliability in more commercial applications would serve rapidly to reveal more clearly the potential of AFBC. The marketplace can be allowed to decide its fate thereafter. Once AFBC has been successfully demonstrated, the relative merits of AFBC and coal-FGD are best left to prospective users to evaluate.

  7. Dose rate reduction method for NMCA applied BWR plants

    International Nuclear Information System (INIS)

    Nagase, Makoto; Aizawa, Motohiro; Ito, Tsuyoshi; Hosokawa, Hideyuki; Varela, Juan; Caine, Thomas

    2012-09-01

    results showed that the Co-60 amount on the coupon with Pt was about 40 % smaller than on the coupon without Pt at 500 hours under no hydrogen peroxide addition case. Hydrogen peroxide had a tendency to accelerate the Co-60 deposition even under low concentration of below 5 ppb. Nevertheless, the presence of Pt on a surface caused a reduction of about 50% in the Co-60 deposition. The above results suggest that recontamination after chemical decontamination is reduced by the presence Pt on these surfaces. This idea is consistent with in-plant tests. In these tests coupons pre-filmed under the NWC conditions were set in a plant's MMS (Mitigation Monitoring System) along with coupons that had been treated by the HOP method. Both of these coupons were inserted on the MMS just before OLNC applications were performed in two BWR plants; Cooper and River Bend. These coupons were removed from the MMS after about 7 months from the installation. Co-60 on the coupon surfaces were dissolved and quantified. Though the absolute value of Co-60 amount was not equal in the coupons from the two plants, in both sets of coupons the amount of Co-60 on the decontaminated coupons was about half of the Co-60 measured on the pre-filmed coupons. These results indicate that the presence of platinum before an oxide layer is generated reduces the amount of Co-60 incorporation. The Co deposition coefficient calculated from the Co-60 amounts of the decontaminated coupons, Co-60 concentration in the reactor water and the deposition term was very small compared to that calculated from many plants data. The combination of chemical decontamination followed by the Pt deposition before operation and Zn injection under HWC condition was considered to be effective method to accomplish the low BRAC dose rate in NMCA applied BWR plants based on the laboratory experiments and in-plant tests. (authors)

  8. Multi-Application Small Light Water Reactor Final Report

    International Nuclear Information System (INIS)

    Modro, S.M.; Fisher, J.E.; Weaver, K.D.; Reyes, J.N.; Groome, J.T.; Babka, P.; Carlson, T.M.

    2003-01-01

    The Multi-Application Small Light Water Reactor (MASLWR) project was conducted under the auspices of the Nuclear Energy Research Initiative (NERI) of the U.S. Department of Energy (DOE). The primary project objectives were to develop the conceptual design for a safe and economic small, natural circulation light water reactor, to address the economic and safety attributes of the concept, and to demonstrate the technical feasibility by testing in an integral test facility. This report presents the results of the project. After an initial exploratory and evolutionary process, as documented in the October 2000 report, the project focused on developing a modular reactor design that consists of a self-contained assembly with a reactor vessel, steam generators, and containment. These modular units would be manufactured at a single centralized facility, transported by rail, road, and/or ship, and installed as a series of self-contained units. This approach also allows for staged construction of an NPP and ''pull and replace'' refueling and maintenance during each five-year refueling cycle. Development of the baseline design concept has been sufficiently completed to determine that it complies with the safety requirements and criteria, and satisfies the major goals already noted. The more significant features of the baseline single-unit design concept include: (1) Thermal Power--150 MWt; (2) Net Electrical Output--35 MWe; (3) Steam Generator Type--Vertical, helical tubes; (4) Fuel UO 2 , 8% enriched; (5) Refueling Intervals--5 years; (6) Life-Cycle--60 years. The economic performance was assessed by designing a power plant with an electric generation capacity in the range of current and advanced evolutionary systems. This approach allows for direct comparison of economic performance and forms a basis for further evaluation, economic and technical, of the proposed design and for the design evolution towards a more cost competitive concept. Applications such as cogeneration

  9. Development of new irradiation facility for BWR safety research

    International Nuclear Information System (INIS)

    Okada, Yuji; Magome, Hirokatsu; Iida, Kazuhiro; Hanawa, Hiroshi; Ohmi, Masao

    2013-01-01

    In JAEA (Japan Atomic Energy Agency), about the irradiation embrittlement of the reactor pressure vessel and the stress corrosion cracking of reactor core composition apparatus concerning the long-term use of the light water reactor (BWR), in order to check the influence of the temperature, pressure, and water quality, etc on BWR condition. The water environmental control facility which performs irradiation assisted stress corrosion-cracking (IASCC) evaluation under BWR irradiation environment was fabricated in JMTR (Japan Materials Testing Reactor). This report is described the outline of manufacture of the water environmental control facility for doing an irradiation test using the saturation temperature capsule after JMTR re-operation. (author)

  10. Integrated sequence analysis. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, K.; Pyy, P

    1998-02-01

    The NKS/RAK subprojet 3 `integrated sequence analysis` (ISA) was formulated with the overall objective to develop and to test integrated methodologies in order to evaluate event sequences with significant human action contribution. The term `methodology` denotes not only technical tools but also methods for integration of different scientific disciplines. In this report, we first discuss the background of ISA and the surveys made to map methods in different application fields, such as man machine system simulation software, human reliability analysis (HRA) and expert judgement. Specific event sequences were, after the surveys, selected for application and testing of a number of ISA methods. The event sequences discussed in the report were cold overpressure of BWR, shutdown LOCA of BWR, steam generator tube rupture of a PWR and BWR disturbed signal view in the control room after an external event. Different teams analysed these sequences by using different ISA and HRA methods. Two kinds of results were obtained from the ISA project: sequence specific and more general findings. The sequence specific results are discussed together with each sequence description. The general lessons are discussed under a separate chapter by using comparisons of different case studies. These lessons include areas ranging from plant safety management (design, procedures, instrumentation, operations, maintenance and safety practices) to methodological findings (ISA methodology, PSA,HRA, physical analyses, behavioural analyses and uncertainty assessment). Finally follows a discussion about the project and conclusions are presented. An interdisciplinary study of complex phenomena is a natural way to produce valuable and innovative results. This project came up with structured ways to perform ISA and managed to apply the in practice. The project also highlighted some areas where more work is needed. In the HRA work, development is required for the use of simulators and expert judgement as

  11. Prediction of droplet deposition around BWR fuel spacer by FEM flow analysis

    International Nuclear Information System (INIS)

    Yamamoto, Yasushi; Morooka, Shinichi

    1997-01-01

    The critical power of the BWR fuel assembly has been remarkably increased. That increase mainly depends on the improvement of the spacer which keeps fixed gaps between fuel rods. So far, these improvements have been carried out on the basis of what developers consider to be appropriate and the results of mockup tests of the BWR fuel assembly. However, continued reliance on these approaches for the development of a higher performance fuel assembly will prove time-consuming and costly. Therefore, it is hoped that the spacer effects for the critical power can be investigated by computer simulation, and it is significantly important to develop the critical power prediction method. Direct calculation of the two-phase flow in a BWR fuel channel s still difficult. Accordingly, a new method for predicting the critical power was proposed. Our method consists of CFD (computer fluid dynamics) code based on the single-phase flow analysis method and the subchannel analysis code. To verify our method, the critical power predictions for various spacer geometries were performed. The predicted results of the critical power were compared with the experimental data. The result of the comparison showed a good agreement and the applicability of our method for various spacer geometries. (author)

  12. 76 FR 57646 - Final Withdrawal of Certain Federal Aquatic Life Water Quality Criteria Applicable to Wisconsin

    Science.gov (United States)

    2011-09-16

    ... Final Withdrawal of Certain Federal Aquatic Life Water Quality Criteria Applicable to Wisconsin AGENCY... aquatic life water quality criteria applicable to Wisconsin? C. Why is the EPA not withdrawing Wisconsin's chronic endrin aquatic life use criterion for waters designated as Warm Water Sportfish and Warm Water...

  13. Boiling water system of nuclear power plants (BWR)

    International Nuclear Information System (INIS)

    Martias Nurdin

    1975-01-01

    About 85% of the world electric generators are light water reactors. It shows that LWR is technologically and economically competitive with other generators. The Boiling Water Reactor (BWR) is one of the two systems in the LWR group. The techniques of BWR operation in several countries, especially low and moderate power BWR, are presented. The discussion is made in relation with the interconnection problems of electric installation in developing countries, including Indonesia, where the total electric energy installation is low. The high reliability and great flexibility of the operation of a boiling water reactor for a sufficiently long period are also presented. Component standardization for BWR system is discussed to get a better technological and economical performance for further development. (author)

  14. BWR stability: history and state-of-the-art

    International Nuclear Information System (INIS)

    Yadigaroglu, George

    2014-01-01

    The paper briefly recalls the historical developments, reviews the important phenomena, the analytical and simulation tools that are used for the analysis of BWR stability focussing on the linear, frequency domain methods

  15. Level controlling system in BWR type reactors

    International Nuclear Information System (INIS)

    Joge, Toshio; Higashigawa, Yuichi; Oomori, Takashi.

    1981-01-01

    Purpose: To reasonably attain fully automatic water level control in the core of BWR type nuclear power plants. Constitution: A feedwater flow regulation valve for reactor operation and a feedwater flow regulation valve for starting are provided at the outlet of a motor-driven feedwater pump in a feedwater system, and these valves are controlled by a feedwater flow rate controller. While on the other hand, a damp valve for reactor clean up system is controlled either in ''computer'' mode or in ''manual'' mode selected by a master switch, that is, controlled from a computer or the ON-OFF switch of the master switch by way of a valve control analog memory and a turn-over switch. In this way, the water level in the nuclear reactor can be controlled in a fully automatic manner reasonably at the starting up and shutdown of the plant to thereby provide man power saving. (Seki, T.)

  16. Pressure vessel for a BWR type reactor

    International Nuclear Information System (INIS)

    Shimamoto, Yoshiharu.

    1980-01-01

    Purpose: To prevent the retention of low temperature water and also prevent the thermal fatigue of the pressure vessel by making large the curvature radius of a pressure vessel of a feed water sparger fitting portion and accelerating the mixing of low-temperature water at the feed water sparger base and in-pile hot water. Constitution: The curvature radius of the corner of the feed water sparger fitting portion in a pressure vessel is formed largely. In-pile circulating water infiltrates up to the base portion of the feed water sparger to carry outside low-temperature water at the base part, which is mixed with in-pile hot water. Accordingly, low temperature water does not stay at the base portion of the feed water sparger and generation of thermal fatigue in the pressure vessel can be prevented and the safety of the BWR type reactor can be improved. (Yoshino, Y.)

  17. Evaluation of internal flooding in a BWR

    International Nuclear Information System (INIS)

    Shiu, K.; Papazoglou, I.A.; Sun, Y.H.; Anavim, E.; Ilberg, D.

    1985-01-01

    Flooding inside a nuclear power station is capable of concurrently disabling redundant safety systems. This paper presents the results of a recent review study performed on internally-generated floods inside a boiling water reactor (BWR) reactor building. The study evaluated the flood initiator frequency due to either maintenance or ruptures using Markovian models. A time phased event tree approach was adopted to quantify the core damage frequency based on the flood initiator frequency. It is found in the study that the contribution to the total core damage due to internal flooding events is not insignificant and is comparable to other transient contributors. The findings also indicate that the operator plays an important role in the prevention as well as the mitigation of a flooding event

  18. A BWR Safety and Operability Improvements

    International Nuclear Information System (INIS)

    Sawyer, Craig D.

    1993-01-01

    The A BWR is the culmination of 30 years of design, development and operating experience of BWRs around the world. It represents across the board improvements is safety, operation and maintenance practices (O and M), economics, radiation exposure and rad waste generation. More than ten years and $20m5 went into the design and development of its new features, and it is now under construction in Japan. This paper concentrates on the safety and operability improvements. In the safety area, more than a decade improvement in core damage frequency (CDFR) has been assessed by formal PIRA techniques, with CDFR less than 10 -6 /year. Severe accident mitigation has also been formally addressed in the design. Plant operations were simplified by incorporation of better materials, optimum use of redundancy in mechanical and electrical equipment so that on-line maintenance can be performed, by better arrangements which account for required maintenance practices, and by an advanced control room

  19. BWR stability using a reducing dynamical model

    International Nuclear Information System (INIS)

    Ballestrin Bolea, J. M.; Blazquez Martinez, J. B.

    1990-01-01

    BWR stability can be treated with reduced order dynamical models. When the parameters of the model came from dynamical models. When the parameters of the model came from experimental data, the predictions are accurate. In this work an alternative derivation for the void fraction equation is made, but remarking the physical structure of the parameters. As the poles of power/reactivity transfer function are related with the parameters, the measurement of the poles by other techniques such as noise analysis will lead to the parameters, but the system of equations is non-linear. Simple parametric calculation of decay ratio are performed, showing why BWRs become unstable when they are operated at low flow and high power. (Author)

  20. BWR stability using a reduced dynamical model

    International Nuclear Information System (INIS)

    Ballestrin Bolea, J.M.; Blazquez, J.B.

    1990-01-01

    BWR stability can be treated with reduced order dynamical models. When the parameters of the model came from experimental data, the predictions are accurate. In this work an alternative derivation for the void fraction equation is made, but remarking the physical struct-ure of the parameters. As the poles of power/reactivity transfer function are related with the parameters, the measurement of the poles by other techniques such as noise analysis will lead to the parameters, but the system of equations in non-linear. Simple parametric calculat-ion of decay ratio are performed, showing why BWRs become unstable when they are operated at low flow and high power. (Author). 7 refs

  1. Advanced technology for BWR operator training simulator

    International Nuclear Information System (INIS)

    Shibuya, Akira; Fujita, Eimitsu; Nakao, Toshihiko; Nakabaru, Mitsugu; Asaoka, Kouchi.

    1991-01-01

    This paper describes an operator training simulator for BWR nuclear power plants which went into service recently. The simulator is a full scope replica type simulator which faithfully replicates the control room environment of the reference plant with six main control panels and twelve auxiliary ones. In comparison with earlier simulators, the scope of the simulation is significantly extended in both width and depth. The simulation model is also refined in order to include operator training according to sympton-based emergency procedure guidelines to mitigate the results in accident cases. In particular, the core model and the calculational model of the radiation intensity distribution, if radioactive materials were released, are improved. As for simulator control capabilities by which efficient and effective training can be achieved, various advanced designs are adopted allowing easy use of the simulators. (author)

  2. Manufacturing technology and process for BWR fuel

    International Nuclear Information System (INIS)

    Kato, Shigeru

    1996-01-01

    Following recent advanced technologies, processes and requests of the design changes of BWR fuel, Nuclear Fuel Industries, Ltd. (NFI) has upgraded the manufacturing technology and honed its own skills to complete its brand-new automated facility in Tokai in the latter half of 1980's. The plant uses various forms of automation throughout the manufacturing process: the acceptance of uranium dioxide powder, pelletizing, fuel rod assembling, fuel bundle assembling and shipment. All processes are well computerized and linked together to establish the integrated control system with three levels of Production and Quality Control, Process Control and Process Automation. This multi-level system plays an important role in the quality assurance system which generates the highest quality of fuels and other benefits. (author)

  3. Facility of BWR type nuclear power plant

    International Nuclear Information System (INIS)

    Kubo, Mitsuji

    1998-01-01

    A condensate filtering device for cleaning condensate flown from a low pressure turbine and a condensate desalting device are connected by way of a condensate pipeline. Control rod drives (CRD) are disposed to the lower portion of BWR. A CRD pump and one end of a CRD feedwater pipeline are connected in series to the upstream of CRD. The other end of the CRD feedwater pipeline is connected to a CRD water taking pipeline branched from the condensate pipeline. Water is taken to the CRD from downstream of the condensate filtering device and upstream of a connecting portion between a low pressure heater drain pipeline and the condensate pipeline. Flow of impurities leached out of the condensate desalting device to the reactor can be suppressed, and rising of temperature of CRD water by the low pressure heater drain water is prevented. In addition, flowing of dissolved oxygen to the CRD system can be suppressed. (I.N.)

  4. Assessment of two BWR accident management strategies

    International Nuclear Information System (INIS)

    Hodge, S.A.; Petek, M.

    1991-01-01

    A recently completed Oak Ridge effort proposes two management strategies for mitigation of the events that might occur in-vessel after the onset of significant core damage in a BWR severe accident. While the probability of such an accident is low, there may be effective yet inexpensive mitigation measures that could be implemented employing the existing plant equipment and requiring only additions to the plant emergency procedures. In this spirit, accident management strategies have been proposed for use of a borated solution for reactor vessel refill should control blade damage occur during a period of temporary core dryout and for containment flooding to maintain the core debris within the reactor vessel if injection systems cannot be restored. The proposed strategy for poisoning of the water used for vessel reflood should injection systems be restored after control blade damage has occurred has great promise, using only the existing plant equipment but employing a different chemical form for the boron poison. The dominant BWR severe accident sequence is Station Blackout and without means for mechanical stirring or heating of the storage tank, the question of being able to form the poisoned solution under accident conditions becomes of supreme importance. On the other hand, the proposed strategy for drywell flooding to cool the reactor vessel bottom head and prevent the core and structure debris from escaping to the drywell holds less promise. This strategy does, however, have potential for future plant designs in which passive methods might be employed to completely submerge the reactor vessel under severe accident conditions without the need for containment venting

  5. Seismic PRA of a BWR plant

    International Nuclear Information System (INIS)

    Nishio, Masahide; Fujimoto, Haruo

    2014-01-01

    Since the occurrence of nuclear power plant accidents in the Fukushima Daichi nuclear power station, the regulatory framework on severe accident (SA) has been discussed in Japan. The basic concept is to typify and identify the accident sequences leading to core/primary containment vessel (PCV) damage and to implement SA measures covering internal and external events extensively. As Japan is an earthquake-prone country and earthquakes and tsunami are important natural external events for nuclear safety of nuclear power plants, JNES performed the seismic probabilistic risk assessment (PRA) on a typical nuclear power plant and evaluated the dominant accident sequences leading to core/PCV damage to discuss dominant scenarios of severe accident (SA). The analytical models and the results of level-1 seismic PRA on a 1,100 MWe BWR-5 plant are shown here. Seismic PRA was performed for a typical BWR5 plant. Initiating events with large contribution to core damage frequency are the loss of all AC powers (station blackout) and the large LOCA. The top of dominant accident sequences is the simultaneous occurrence of station blackout and large LOCA. Important components to core damage frequency are electric power supply equipment. It needs to keep in mind that the results are influenced on site geologic characteristic to a greater or lesser. In the process of analysis, issues such as conservative assumptions related to damages of building or structure and success criteria for excessive LOCA are left to be resolved. These issues will be further studied including thermal hydric analysis in the future. (authors)

  6. Artificial intelligence applied to fuel management in BWR type reactors

    International Nuclear Information System (INIS)

    Ortiz S, J.J.

    1998-01-01

    In this work two techniques of artificial intelligence, neural networks and genetic algorithms were applied to a practical problem of nuclear fuel management; the determination of the optimal fuel reload for a BWR type reactor. This is an important problem in the design of the operation cycle of the reactor. As a result of the application of these techniques, comparable or even better reloads proposals than those given by expert companies in the subject were obtained. Additionally, two other simpler problems in reactor physics were solved: the determination of the axial power profile and the prediction of the value of some variables of interest at the end of the operation cycle of the reactor. Neural networks and genetic algorithms have been applied to solve many problems of engineering because of their versatility but they have been rarely used in the area of fuel management. The results obtained in this thesis indicates the convenience of undertaking further work on this area and suggest the application of these techniques of artificial intelligence to the solution of other problems in nuclear reactor physics. (Author)

  7. Kuosheng BWR/6 containment safety analysis with gothic code

    International Nuclear Information System (INIS)

    Lin Ansheng; Wang Jongrong; Yuann Rueyyng; Shih Chunkuan

    2011-01-01

    Kuosheng Nuclear Power Plant in Taiwan is a GE-designed twin-unit BWR/6 plant, each unit rated at 2894 MWt. In this study, we presented the calculated results of the containment pressure and temperature responses after the main steam line break accident, which is the design basis for the containment system. During the simulation, a power of SPU range (105.1%) was used and a model of the Mark III type containment was built using the containment thermal-hydraulic program GOTHIC. The simulation consists of short and long-term responses. The drywell pressure and temperature responses which display the maximum values in the early state of the LOCA were investigated in the short-term response; the primary containment pressure and temperature responses in the long-term response. The blowdown flow was provided by FSAR and used as boundary conditions in the short-term model; in the long-term model, the blowdown flow was calculated using a GOTHIC built-in homogeneous equilibrium model. In the long-term analysis, a simplifier RPV model was employed to calculate the blowdown flow. Finally, the calculated results, similar to the FSAR results, indicate the GOTHIC code has the capability to simulate the pressure/temperature response of Mark III containment to the main steam line break LOCA. (author)

  8. BWR Radiation Assessment and Control Program: assessment and control of BWR radiation fields. Volume 1. Executive summary

    International Nuclear Information System (INIS)

    Anstine, L.D.

    1983-05-01

    This report covers work on the BWR Radiation Assessment and Control (BRAC) Program from 1978 to 1982. The major activities during this report period were assessment of the radiation-level trends in BWRs, evaluation of the effects of forward-pumped heater drains on BWR water quality, installation and operation of a corrosion-product deposition loop in an operating BWR, and analyzation of fuel-deposit samples from two BWRs. Radiation fields were found to be controlled by cobalt-60 and to vary from as low as 50 mr/hr to as high as 800 mr/hr on the recirculation-system piping. Detailed information on BWR corrosion films and system deposits is presented in the report. Additionally, the results of an oxygen-injection experiment and recontamination monitoring studies are provided

  9. Analysis of the integrity of the pressure vessel of the BWR type nuclear reactor

    International Nuclear Information System (INIS)

    Silva Luna, O.

    1982-01-01

    The presssure vessel of a BWR type reactor was monitored for cracking during alternating events of its in-service life. The monitoring was to determine criticality of fractures catastrophic fractures and the velocity of fracture propagation. Detected cracks were evaluated as specified in ASME code section XI, of a minimum wall thickness of 2.5% crack growths were compared a) of 1/10 of the critical maximum size and b) at in-service inspection intervals according to ASME recommendations to be established at the Laguna Verde nuclear plant. Finally conclusions are made and discussed. (author)

  10. Claims Procedure for Plans Providing Disability Benefits; 90-Day Delay of Applicability Date. Final rule; delay of applicability

    Science.gov (United States)

    2017-11-29

    This document delays for ninety (90) days--through April 1, 2018--the applicability of a final rule amending the claims procedure requirements applicable to ERISA-covered employee benefit plans that provide disability benefits (Final Rule). The Final Rule was published in the Federal Register on December 19, 2016, became effective on January 18, 2017, and was scheduled to become applicable on January 1, 2018. The delay announced in this document is necessary to enable the Department of Labor to carefully consider comments and data as part of its effort, pursuant to Executive Order 13777, to examine regulatory alternatives that meet its objectives of ensuring the full and fair review of disability benefit claims while not imposing unnecessary costs and adverse consequences.

  11. Genusa Bepu methodologies for the safety analysis of BWRs; Metodologias Bepu de Genusa para el analisis de seguridad de reactores BWR

    Energy Technology Data Exchange (ETDEWEB)

    Trueba, M.; Garcia, J.; Goodson, C.; Ibarra, L.

    2016-08-01

    This article describes the BEPU methodologies developed by General Electric-Hitachi (GEH) for the evaluation of the BWR reactor safety analysis based on the TRACG best-estimate code. These methodologies are applicable to a wide range of events, operational transients (AOO), anticipated transients without scram (ATWS), loss of coolant accidents (LOCA) and instability events; to different BWR types operating commercially. General Electric (GE( designs and other vendors, including Generation III+ESBWR; to the new operation strategies, and to all types of BWR fuel. Their application achieves, among other benefits, a better understanding of the overall plant response and an improvement in margins to the operating limits; thus, the increase of flexibility in reactor operation and reduction in generation costs. (Author)

  12. Estimation of skyshine dose from turbine building of BWR plant using Monte Carlo code

    Energy Technology Data Exchange (ETDEWEB)

    Yuji, Nemoto; Toshihisa, Tsukiyama; Shigeki, Nemezawa [Hitachi. Ltd., Saiwai-cho, Hitachi (Japan); Tadashi, Yamasaki; Hidetsugu, Okada [Chubu Electric Power Company, Inc., Odaka-cho, Midori-ku Nagoya (Japan)

    2007-07-01

    The Monte Carlo N-Particle transport code (MCNP) was adopted to calculate the skyshine dose from the turbine building of a BWR plant for obtaining precise estimations at the site boundary. In MCNP calculation, the equipment and piping arranged on the operating floor of the turbine building were considered and modeled in detail. The inner and outer walls of the turbine building, the shielding materials around the high-pressure turbine, and the piping connected from the moisture separator to the low-pressure turbine were all considered. A three-step study was conducted to estimate the applicability of MCNP code. The first step is confirming the propriety of calculation models. The atmospheric relief diaphragms, which are installed on top of the low-pressure turbine exhaust hood, are not considered in the calculation model. There was little difference between the skyshine dose distributions that were considered when using and not using the atmospheric relief diaphragms. The calculated dose rates agreed well with the measurements taken around the turbine. The second step is estimating the dose rates on the outer roof surface of the turbine building. This calculation was made to confirm the dose distribution of gamma-rays on the turbine roof before being scattered into the air. The calculated dose rates agreed well with the measured data. The third step is making a final confirmation by comparing the calculations and measurements of skyshine dose rates around the turbine building. The source terms of the main steam system are based on the measured activity data of N-16 and C-15. As a conclusion, we were able to calculate reasonable skyshine dose rates by using MCNP code. (authors)

  13. Technical support document for land application of sewage sludge. Volume 1. Final report

    International Nuclear Information System (INIS)

    Jones, A.; Beyer, L.; Rookwood, M.; Pacenka, J.; Bergin, J.

    1992-11-01

    The document provides the technical background and justification for the U.S. Environmental Protection Agency's (EPA) final regulation (40 CFR Part 503) covering the land application of sewage sludge. The document summarizes current practices in land application and presents data supporting the risk assessment methodology used to derive human health and environmental risk-based limits for contaminants in land applied sewage sludge. The management practices associated with land application are outlined and the different pathways by which contaminants reach highly-exposed individuals (HEIs) through land application are discussed

  14. CFD predictions of standby liquid control system mixing in lower plenum of a BWR

    International Nuclear Information System (INIS)

    Boyd, Christopher; Skarda, Raymond

    2014-01-01

    Highlights: • Computational fluid dynamics analysis of BWR lower plenum. • Mixing and stratification of the standby liquid control system injection. • Scoping study highlights the expected flow paths and limitations of experiments. - Abstract: During an anticipated transient without scram (ATWS) scenario in certain boiling water reactor (BWR) systems, a standby liquid control system (SLCS) is used to inject a sodium pentaborate solution into the reactor system in order to quickly shut down (scram) the reactor without the use of the control rods. Some BWR designs utilize a SLCS that injects through a set of nozzles on a vertical pipe in the peripheral region of the lower plenum of the reactor vessel. During the scenario, system water levels are reduced and natural circulation flow rates down through the jet pump nozzles and up into the core are a small fraction of the rated system flow. It is during this period that the SLCS flows are considered. This work outlines some initial scoping studies completed by the staff at the Nuclear Regulatory Commission (NRC). An attempt at benchmarking the computational fluid dynamics (CFD) approach using a set of available test data from a small facility is outlined. Due to our lack of information related to specific details of the facility geometry along with the limited data available from the test, the benchmark exercise produced only a qualitative basis for selecting turbulence models and mesh density. A CFD model simulating a full-scale reactor system is developed for the lower plenum of a representative BWR/4 design and SLCS flows and mixing are studied under a range of flow conditions. The full-scale BWR simulation builds upon the lessons learned from the benchmark exercise. One challenge for this work is the large size of the domain and the relatively small size of the geometric details such as flow passages and gaps. The geometry is simplified to make meshing feasible by eliminating some of the small features. The

  15. Advanced Construction of Compact Containment BWR

    International Nuclear Information System (INIS)

    Takahashi, M.; Maruyama, T.; Mori, H.; Hoshino, K.; Hijioka, Y.; Heki, H.; Nakamaru, M.; Hoshi, T.

    2006-01-01

    The reactor concept considered in this paper has a mid/small power output, a compact containment and a simplified BWR configuration with comprehensive safety features. Compact Containment BWR (CCR) is being developed with matured BWR technologies together with innovative systems/components, will provide attractiveness for the energy market in the world due to its flexibility in energy demands as well as in site conditions, its high potential in reducing investment risk and its safety feature facilitating public acceptance. The flexibility is achieved by CCR's mid/small power output of 400 MWe class and capability of long operating cycle (refueling intervals). The high investment potential is expected from CCR's simplification/innovation in design such as natural circulation core cooling with the bottom located short core, top mounted upper entry control rod drives (CRDs) with ring-type dryers and simplified safety system with high pressure resistible primary containment vessel (PCV) concept. The natural circulation core eliminates recirculation pumps as well as needs for maintenance of such pumps. The top mounted upper entry CRDs enable the bottom located short core in RPV. The safety feature mainly consists of large water inventory above the core without large penetration below the top of the core, passive cooling system by isolation condenser (IC), high pressure resistible PCV and in-vessel retention (IVR) capability. The large inventory increases the system response time in case of design base accidents including loss of coolant accidents. The IC suppresses PCV pressure by steam condensation without any AC power. Cooling the molten core inside the RPV if the core should be damaged by loss of core coolability could attain the IVR. CCR's specific self-standing steel high pressure resistible PCV is designed to contain minimum piping and valves inside with reactor pressure vessel (RPV), only 13 m in diameter and 24 m in height. This compact PCV makes it possible to

  16. Best-practices guidelines for L2PSA development and applications. Volume 2 - Best practices for the Gen II PWR, Gen II BWR L2PSAs. Extension to Gen III reactors

    International Nuclear Information System (INIS)

    Raimond, E.; Durin, T.; Rahni, N.; Meignen, R.; Cranga, M.; Pichereau, F.; Bentaib, A.; Guigueno, Y.; Loeffler, H.; Mildenberger, O.; Lajtha, G.; Santamaria, C.S.; Dienstbier, J.; Rydl, A.; Holmberg, J.E.; Lindholm, I.; Maennistoe, I.; Pauli, E.M.; Dirksen, G.; Grindon, L.; Peers, K.; Hulqvist, G.; Parozzi, F.; Polidoro, F.; Cazzoli, E.; Vitazkova, J.; Burgazzi, L.; Oury, L.; Ngatchou, C.; Siltanen, S.; Niemela, I.; Routamo, T.; Helstroem, P.; Bassi, C.; Brinkman, H.; Seidel, A.; Schubert, B.; Wohlstein, R.; Guentay, S.; Vincon, L.

    2010-01-01

    The objective of this coordinated action was to develop best practice guidelines for the performance of Level 2 PSA methodologies with a view of harmonisation at EU level and to allow meaningful and practical uncertainty evaluations in a Level 2 PSA. Specific relationships with community in charge of nuclear reactor safety (utilities, safety authorities, vendors, and research or services companies) have been established in order to define the current needs in terms of guidelines for level 2 PSA development and applications. An international workshop was organised in Hamburg, with the support of VATTENFALL, in November 2008. The level 2 PSA experts from the ASAMPSA2 project partners have proposed some guidelines for the development and application of L2PSA based on their experience and on information available from international cooperation (EC Severe Accident network of Excellence - SARNET, IAEA standards, OECD-NEA publications and workshop) or open literature. The number of technical issues addressed in the guideline is very large and all are not covered with the same relevancy in the first version of the guideline. This version is submitted for external review in November 2010 by severe accident experts and PSA, especially, from SARNET and OECD-NEA members. The feedback of the external review will be dis cussed during an international open works hop planned in March 2011 and all outcomes will be taken into consideration in the final version of this guideline (June 2011). The guideline includes 3 volumes: - Volume 1 - General considerations on L2PSA. - Volume 2 - Technical recommendations for Gen II and III reactors. - Volume 3 - Specific considerations for future reactor (Gen IV). The recommendations formulated in the guideline should not be considered as 'mandatory' but should help the L2PSA developers to achieve high quality studies with limited time and resources. It may also help the L2PSA reviewers by positioning one specific study in comparison with some

  17. Crud separation from equipment drain of BWR atomic power station

    International Nuclear Information System (INIS)

    Hayashi, Masaru; Yamaguchi, Hisashi; Moriya, Yasuhiro; Koshiba, Yukihiko; Ota, Yoshiharu.

    1977-01-01

    In the primary cooling systems of BWR nuclear power stations, radioactive crud is generated and accumulates in reactors and circulating systems, which causes the radiation exposure of workers at the time of the inspection and maintenance of reactors. The chemical composition and grain size distribution of crud differ largely according to the construction of primary systems, the operational conditions of reactors, and the process of operation. The study on the application of nuclear pore membrane filter NPMF to the separation of crud in the waste water from equipment drain systems has been carried out. With the NPMF, clarified filtrate can be obtained without any filter aid, therefore the secondary waste of filter sludge is not generated. When the filter is clogged, the filtration capability can be regenerated by reverse flow washing, and continuous filtration is possible actually because the regeneration takes only short time. The NPMF is the polycarbonate membrane of about 10 μm thick, to which charged particles are irradiated vertically, and the flight tracks are etched with alkali solution, thus the required pore treatment is applied. The basic investigation of waste liquid, the endurance test of actual filters, the filtration test with the pilot apparatus, the demonstration test with an actual equipment, and the design of the actual equipment have been carried out for three years. (Kako, I.)

  18. BWR regional instability model and verification on ringhals-1 test

    International Nuclear Information System (INIS)

    Hotta, Akitoshi; Suzawa, Yojiro

    1996-01-01

    Regional instability is known as one type of the coupled neutronic-thermohydraulic phenomena of boiling water reactors (BWRs), where the thermohydraulic density wave propagation mechanism is predominant. Historically, it has been simulated by the three-dimensional time domain code in spite of its significant computing time. On the other hand, there have been proposals to apply the frequency domain models in regional instability considering the subcriticality of the higher neutronic mode. However, their application still remains in corewide instability mainly because of the lack of more detailed methodological and empirical studies. In this study, the current version of the frequency domain model was extended and verified based on actual core regional instability measurement data. The mathematical model LAPUR, the well-known frequency domain stability code, was reviewed from the standpoint of pure thermohydraulics and neutronic-thermohydraulic interaction mechanisms. Based on the ex-core loop test data, the original LAPUR mixed friction and local pressure loss model was modified, taking into account the different dynamic behavior of these two pressure-loss mechanisms. The perturbation term of the two-phase friction multiplier, which is the sum of the derivative of void fraction and subcool enthalpy, was adjusted theoretically. The adequacy of the instability evaluation system was verified based on the Ringhals unit 1 test data, which were supplied to participants of the Organization for Economic Cooperation and Development/Nuclear Energy Agency BWR Stability Benchmark Project

  19. Development status of compact containment BWR

    International Nuclear Information System (INIS)

    Heki, H.; Nakamaru, M.; Mori, H.; Sekiguchi, K.; Kuroki, M.; Arai, K.; Hida, T.

    2005-01-01

    In Japan, increase of nuclear plant unit capacity has been promoted to take advantage of economies of scale while further enhancing safety and reliability. As a result, more than 50 units of nuclear power plants are playing important role in electric power generation. However, the factors, such as stagnant growth in the recent electricity demand, limitation in electricity grid capacity and limited in initial investment avoiding risk, will not be in favor of large plant outputs. The reactor concept considered in this paper has a small power output, a compact containment and a simplified BWR configuration with comprehensive safety features. The Compact Containment Boiling Water Reactor (CCR), which is being developed with matured BWR technologies together with innovative systems/components, will provide attractiveness for the energy market in the world due to its flexibility in energy demands as well as in site conditions, its high potential in reducing investment risk and its safety feature facilitating public acceptance. The flexibility is achieved by CCR's mid/small power output of 400 MWe class and capability of long operating cycle (refueling intervals). The high investment potential is expected from CCR's simplification/innovation in design such as natural circulation core cooling with the bottom located short core, top mounted upper entry control rod drives (CRDs) with ring-type dryers and simplified ECCS system with high pressure resistible primary containment vessel (PCV) concept. The natural circulation core eliminates recirculation pumps as well as needs for maintenance of such pumps. The top mounted upper entry CRDs enable the bottom located short core in RPV. The safety feature mainly consists of large water inventory above the core without large penetration below the top of the core, passive cooling system by isolation condenser (IC), high pressure resistible PCV and in-vessel retention (IVR) capability. The large inventory increases the system response

  20. Status update of the BWR cask simulator

    Energy Technology Data Exchange (ETDEWEB)

    Lindgren, Eric R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Durbin, Samuel G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    The performance of commercial nuclear spent fuel dry storage casks are typically evaluated through detailed numerical analysis of the system's thermal performance. These modeling efforts are performed by the vendor to demonstrate the performance and regulatory compliance and are independently verified by the Nuclear Regulatory Commission (NRC). Carefully measured data sets generated from testing of full sized casks or smaller cask analogs are widely recognized as vital for validating these models. Numerous studies have been previously conducted. Recent advances in dry storage cask designs have moved the storage location from above ground to below ground and significantly increased the maximum thermal load allowed in a cask in part by increasing the canister helium pressure. Previous cask performance validation testing did not capture these parameters. The purpose of the investigation described in this report is to produce a data set that can be used to test the validity of the assumptions associated with the calculations presently used to determine steady-state cladding temperatures in modern dry casks. These modern cask designs utilize elevated helium pressure in the sealed canister or are intended for subsurface storage. The BWR cask simulator (BCS) has been designed in detail for both the above ground and below ground venting configurations. The pressure vessel representing the canister has been designed, fabricated, and pressure tested for a maximum allowable pressure (MAWP) rating of 24 bar at 400 C. An existing electrically heated but otherwise prototypic BWR Incoloy-clad test assembly is being deployed inside of a representative storage basket and cylindrical pressure vessel that represents the canister. The symmetric single assembly geometry with well-controlled boundary conditions simplifies interpretation of results. Various configurations of outer concentric ducting will be used to mimic conditions for above and below ground storage configurations

  1. Standard Technical Specifications General Electric plants, BWR/4:Bases (Sections 3.4-3.10). Volume 3, Revision 1

    International Nuclear Information System (INIS)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry to produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/4 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved STS or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the specifications for all chapters and sections of the improved STS. Volume 2 contains he Bases for Chapters 2.0 and 3.0, and Sections 3.1-3.3 of the improved STS. This document, Volume 3, contains the Bases for Sections 3.4-3.10 of the improved STS

  2. Cross-sections for homogenized BWR fuel elements in 2d-diffusion theory by 1d-transport calculations

    International Nuclear Information System (INIS)

    Ambrosius, G.

    1980-01-01

    Leakage has a large influence on the thermal spectrum in a fuel rod cell of a BWR and originates: a) from rods with different absorptions and; b) from the different distances to the water gaps. Due to reason a) Gd-rods are treated together with a ring of the homogenized eight nearest neighbours. The often used definition of homogenized cross-sections as the ratio of the integrated reaction rate to the integrated flux proved to be inadequate. This homogenization method is exact as far as the flux is constant over the boundary and as the leakag e during calculating the homogenized cross-sections is similar to that during application. With respect to the condition b) a 1d-transport calculation for the whole fuel element with rings or slabs of homogenized fuel rod cells is performed. With the definition above the flux distribution is that of the fluxes in the moderator regions. The spectrum within each fuel rod cell which includes the leakage is calculated by superimposing at each energy on the flux distribution in the cell the flux at the cell position from the bundle calculation. Changes in the flux ratio between fuel and moderator due to the leakage are taken into account in a final few group 2d-diffusion calculation with fuel and (moderator + cladding) taken separately

  3. Standard Technical Specifications General Electric plants, BWR/4: Bases (Sections 2.0-3.3). Volume 2, Revision 1

    International Nuclear Information System (INIS)

    1995-04-01

    This report documents the results of the combined effort of the NRC and the industry produce improved Standard Technical Specifications (STS), Revision 1 for General Electric BWR/4 Plants. The changes reflected in Revision 1 resulted from the experience gained from license amendment applications to convert to these improved ST or to adopt partial improvements to existing technical specifications. This NUREG is the result of extensive public technical meetings and discussions between the Nuclear Regulatory Commission (NRC) staff and various nuclear power plant licensees, Nuclear Steam Supply System (NSSS) Owners Groups, NSSS vendors, and the Nuclear Energy Institute (NEI). The improved STS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume I contains the Specifications for all chapters and sections of the improved STS. This document, Volume 2, contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1-3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4-3.10 of the improved STS

  4. Applications for approval to market a new drug; complete response letter; amendments to unapproved applications. Final rule.

    Science.gov (United States)

    2008-07-10

    The Food and Drug Administration (FDA) is amending its regulations on new drug applications (NDAs) and abbreviated new drug applications (ANDAs) for approval to market new drugs and generic drugs (drugs for which approval is sought in an ANDA). The final rule discontinues FDA's use of approvable letters and not approvable letters when taking action on marketing applications. Instead, we will send applicants a complete response letter to indicate that the review cycle for an application is complete and that the application is not ready for approval. We are also revising the regulations on extending the review cycle due to the submission of an amendment to an unapproved application and starting a new review cycle after the resubmission of an application following receipt of a complete response letter. In addition, we are adding to the regulations on biologics license applications (BLAs) provisions on the issuance of complete response letters to BLA applicants. We are taking these actions to implement the user fee performance goals referenced in the Prescription Drug User Fee Amendments of 2002 (PDUFA III) that address procedures and establish target timeframes for reviewing human drug applications.

  5. 77 FR 50153 - Special Purpose Permit Application; Hawaii-Based Shallow-Set Longline Fishery; Final...

    Science.gov (United States)

    2012-08-20

    ...-FF01M01000] Special Purpose Permit Application; Hawaii-Based Shallow-Set Longline Fishery; Final... of the Hawaii-based shallow-set longline fishery, which targets swordfish. After evaluating several... take of seabirds in the shallow-set longline fishery based in Hawaii. The analysis of alternatives is...

  6. Water level measurement uncertainty during BWR instability

    International Nuclear Information System (INIS)

    Torok, R.C.; Derbidge, T.C.; Healzer, J.M.

    1994-01-01

    This paper addresses the performance of the water-level measurement system in a boiling water reactor (BWR) during severe instability oscillations which, under some circumstances, can occur during an anticipated transient without SCRAM (ATWS). Test data from a prototypical mock-up of the water-level measurement system was used to refine and calibrate a water-level measurement system model. The model was then used to predict level measurement system response, using as boundary conditions vessel pressures calculated by ppercase RETRAN for an ATWS/instability event.The results of the study indicate that rapid pressure changes in the reactor pressure vessel which cause oscillations in downcomer water level, coupled with differences in instrument line lengths, can produce errors in the sensed water level. Using nominal parameters for the measurement system components, a severe instability transient which produced a 0.2 m peak-to-minimum water-level oscillation in the vessel downcomer was predicted to produce pressure difference equivalent to a 0.7 m level oscillation at the input to the differential pressure transmitter, 0.5 m oscillation at the output of the transmitter, and an oscillation of 0.3 m on the water-level indicator in the control room. The level measurement system error, caused by downcomer water-level oscillations and instrument line length differential, is mitigated by damping both in the differential pressure transmitter used to infer level and in the control room display instrument. ((orig.))

  7. BWR fuel clad behaviour following LOCA

    International Nuclear Information System (INIS)

    Chaudhry, S.M.; Vyas, K.N.; Dinesh Babu, R.

    1996-01-01

    Flow and pressure through the fuel coolant channel reduce rapidly following a loss of coolant accident. Due to stored energy and decay heat, fuel and cladding temperatures rise rapidly. Increase in clad temperature causes deterioration of mechanical properties of clad material. This coupled with increase of pressure inside the cladding due to accumulation of fission gases and de-pressurization of coolant causes the cladding to balloon. This phenomenon is important as it can reduce or completely block the flow passages in a fuel assembly causing reduction of emergency coolant flow. Behaviour of a BWR clad is analyzed in a design basis LOCA. Fuel and clad temperatures following a LOCA are calculated. Fission gas release and pressure is estimated using well established models. An elasto-plastic analysis of clad tube is carried out to determine plastic strains and corresponding deformations using finite-element technique. Analysis of neighbouring pins gives an estimate of flow areas available for emergency coolant flow. (author). 7 refs, 6 figs, 3 tabs

  8. Recent technology for BWR operator training simulators

    International Nuclear Information System (INIS)

    Sato, Takao; Hashimoto, Shigeo; Kato, Kanji; Mizuno, Toshiyuki; Asaoka, Koichi.

    1990-01-01

    As one of the important factors for maintaining the high capacity ratio in Japanese nuclear power stations, the contribution of excellent operators is pointed out. BWR Operation Training Center has trained many operators using two full scope simulators for operation training modeling BWRs. But in order to meet the demands of the recent increase of training needs and the upgrading of the contents, it was decided to install the third simulator, and Hitachi Ltd. received the order to construct the main part, and delivered it. This simulator obtained the good reputation as its range of simulation is wide, and the characteristics resemble very well those of the actual plants. Besides, various new designs were adopted in the control of the simulator, and its handling became very easy. Japanese nuclear power plants are operated at constant power output, and the unexpected stop is very rare, therefore the chance of operating the plants by operators is very few. Accordingly, the training using the simulators which can simulate the behavior of the plants with computers, and can freely generate abnormal phenomena has become increasingly important. The mode and positioning of the simulators for operation training, the full scope simulator BTC-3 and so on are reported. (K.I.)

  9. Method of operating BWR type reactors

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1980-01-01

    Purpose: To enable reactor control depending on any demanded loads by performing control by the insertion of control rods in addition to the control by the regulation of the flow rate of the reactor core water at high power operation of a BWR type reactor. Method: The power is reduced at high power operation by decreasing the flow rate of reactor core water from the starting time for the power reduction and the flow rate is maintained after the time at which it reaches the minimum allowable flow rate. Then, the control rod is started to insert from the above time point to reduce the power to an aimed level. Thus, the insufficiency in the reactivity due to the increase in the xenon concentration can be compensated by the withdrawal of the control rods and the excess reactivity due to the decrease in the xenon concentration can be compensated by the insertion of the control rods, whereby the reactor power can be controlled depending on any demanded loads without deviating from the upper or lower limit for the flow rate of the reactor core water. (Moriyama, K.)

  10. Method of operating BWR type power plants

    International Nuclear Information System (INIS)

    Koyama, Kazuaki.

    1981-01-01

    Purpose: To improve the operation efficiency of BWR type reactors by reducing the time from the start-up of the reactor to the start-up of the turbine and electrical generator, as well as decrease the pressure difference in each of the sections of the pressure vessel to thereby extend its life span. Method: The operation comprises switching the nuclear reactor from the shutdown mode to the start-up mode, increasing the reactor power to a predetermined level lower than a rated power while maintaining the reactor pressure to a predetermined level lower than a rated pressure, starting up a turbine and an electrical generator in the state of the predetermined reactor pressure and the reactor power to connect the electrical generator to the power transmission system and, thereafter, increasing the reactor pressure and the reactor power to the predetermined rated pressure and rated power respectively. This can shorten the time from the start-up of the reactor to the start of the power transmission system, whereby the operation efficiency of the power plant can be improved. (Moriyama, K.)

  11. Experience on a BWR plant diagnosis system

    International Nuclear Information System (INIS)

    Tanabe, A.; Kawai, K.; Hashimoto, Y.

    1981-01-01

    It is important to watch plant dynamics and equipment condition for avoiding a big transient or avoiding damage to a system by equipment failure. After the TMI accident the necessity of a diagnosis system has been recognized and such development activities have become of primary importance in many organizations. A diagnosis system has two kinds of function. One is the early detection of an anomaly before detection by a conventional instrumentation system. The other is appropriate instruction after alarm or scram has occurred. The authors have been developing the former system by a noise analysis technique and a feasibility study has been undertaken in recent years as a joint research programme of several electric power companies and the Toshiba Corporation. A prototype diagnosis system has been installed on a BWR plant in Japan. This diagnosis system concerns reactor core, jet pumps and three main control systems. Many data from normal operation have been accumulated using this system and a variation pattern of normal noise data is clarified. On this basis, anomally detection criteria have been determined using statistical decision theory. It is confirmed that this system performance is satisfactory, and that the system will be of great use for surveillance of core and control systems without artificial disturbances. (author)

  12. Power control system in BWR type reactors

    International Nuclear Information System (INIS)

    Nishizawa, Yasuo.

    1980-01-01

    Purpose: To control the reactor power so that the power distribution can satisfy the limiting conditions, by regulating the reactor core flow rate while monitoring the power distribution in the reactor core of a BWR type reactor. Constitution: A power distribution monitor determines the power distribution for the entire reactor core based on the data for neutron flux, reactor core thermal power, reactor core flow rate and control rod pattern from the reactor and calculates the linear power density distribution. A power up ratio computing device computes the current linear power density increase ratio. An aimed power up ratio is determined by converting the electrical power up ratio transferred from a load demand input device into the reactor core thermal power up ratio. The present reactor core thermal power up ratio is subtracted from the limiting power up ratio and the difference is sent to an operation amount indicator and the reactor core flow rate is changed in a reactor core flow rate regulator, by which the reactor power is controlled. (Moriyama, K.)

  13. Fuel assemblies for BWR type reactors

    International Nuclear Information System (INIS)

    Ishizuka, Takao.

    1981-01-01

    Purpose: To enable effective failed fuel detection by the provision of water rod formed with a connecting section connected to a warmed water feed pipe of a sipping device at the lower portion and with a warmed water jetting port in the lower portion in a fuel assembly of a BWR type reactor to thereby carry out rapid sipping. Constitution: Fuel rods and water rods are contained in the channel box of a fuel assembly, and the water rod is provided at its upper portion with a connecting section connected to the warmed water feed pipe of the sipping device and formed at its lower portion with a warmed water jetting port for jetting warmed water fed from the warmed water feed pipe. Upon detection of failed fuels, the reactor operation is shut down and the reactor core is immersed in water. The cover for the reactor container is removed and the cap of the sipping device is inserted to connect the warmed water feed pipe to the connecting section of the water rod. Then, warmed water is fed to the water rod and jetted out from the warmed water jetting port to cause convection and unify the water of the channel box in a short time. Thereafter, specimen is sampled and analyzed for the detection of failed fuels. (Moriyama, K.)

  14. Primary coolant system of BWR type reactor

    International Nuclear Information System (INIS)

    Ibe, Hidefumi; Takahashi, Masanori; Aoki, Yasuko

    1997-01-01

    The present invention provides a water quality control system for preventing corrosion and for extending working life of structural materials of a BWR-type reactor. Namely, a sensor group 1 and a sensor group 2 are disposed at different positions such as in a feedwater system, a recycling system, main steam pipes, and a pressure vessel, respectively. Each sensor group can record and generate alarms independently. The sensor group 1 for usual monitoring is connected to a calculation device by way of a switch to confirm that the monitored values are within a proper range by the injection of a water quality moderating agent. The sensor group 2 is caused to stand alone or connected with the calculation device by way of a switch optionally. When abnormality should occur in the sensor group 1, the sensor group 2 determines the limit for the increase/decrease of controlling amount of the moderating agent at a portion where the conditions are changed to the most severe direction by using data base. The moderating agent is injected and controlled based on the controlling amount. The system of the present invention can optionally cope with a new sensor and determination for new water quality standards. Then the evaluation/control accuracy of the entire system can be improved while covering up the errors of each sensor. (I.S.)

  15. Feedwater control system in BWR type reactor

    International Nuclear Information System (INIS)

    Tanji, Jun-ichi; Oomori, Takashi.

    1980-01-01

    Purpose: To improve the water level control performance in BWR type reactor by regulating the water level set to the reactor depending on the rate of change in the recycling amount of coolant to thereby control the fluctuations in the water level resulted in the reactor within an aimed range even upon significant fluctuations in the recycling flow rate. Constitution: The recycling flow rate of coolant in the reactor is detected and the rate of its change with time is computed to form a rate of change signal. The rate of change signal is inputted to a reactor level setter to amend the actual reactor water level demand signal and regulate the water level set to the reactor water depending on the rate of change in the recycling flow rate. Such a regulation method for the set water level enables to control the water level fluctuation resulted in the reactor within the aimed range even upon the significant fluctuation in the recycling flow rate and improve the water level control performance of the reactor, whereby the operationability for the reactor is improved to enhance the operation rate. (Moriyama, K.)

  16. Power generator in BWR type reactors

    International Nuclear Information System (INIS)

    Yoshida, Kenji.

    1984-01-01

    Purpose: To enable to perform stable and dynamic conditioning operation for nuclear fuels in BWR type reactors. Constitution: The conditioning operation for the nuclear fuels is performed by varying the reactor core thermal power in a predetermined pattern by changing the predetermined power changing pattern of generator power, the rising rate of the reactor core thermal power and the upper limit for the rising power of the reactor core thermal power are calculated and the power pattern for the generator is corrected by a power conditioning device such that the upper limit for the thermal power rising rate and the upper limit for the thermal power rising rate are at the predetermined levels. Thus, when the relation between the reactor core thermal power and the generator electrical power is fluctuated, the fluctuation is detected based on the variation in the thermal power rising rate and the limit value for the thermal power rising rate, and the correction is made to the generator power changing pattern so that these values take the predetermined values to thereby perform the stable conditioning operation for the nuclear fuels. (Moriyama, K.)

  17. Application of tearing modulus stability concepts to nuclear piping. Final report

    International Nuclear Information System (INIS)

    Cotter, K.H.; Chang, H.Y.; Zahoor, A.

    1982-02-01

    The recently developed tearing modulus stability concept was successfully applied to several boiling water reactor (BWR) and pressurized water reactor (PWR) piping systems. Circumferentially oriented through-the-thickness cracks were postulated at numerous locations in each system. For each location, the simplified tearing stability methods developed in USNRC Report NUREG/CR-0838 were used to determine crack stability. The J-T diagram was used to present the results of the computations. The piping systems considered included Type 304 stainless steel as well as A106 carbon steel materials. These systems were analyzed using the piping analysis computer code MINK

  18. Stakes and Solutions for current and up-coming Licensing Challenges in PWR and BWR Reload and Safety Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Curca-Tiving, F.; Opel, S.

    2014-07-01

    Regulatory requirements for reloads and safety analyses are evolving: New safety criteria, requests for enlarged qualification databases, statistical applications, uncertainty propagation... In order to address these challenges and access more predictable licensing processes, AREVA implements a consistent code and methodology suite for PWR and BWR core design and safety analysis, based on a first principles modeling with an extremely broad international verification and validation data base. (Author)

  19. Fast neutron fluence calculations as support for a BWR pressure vessel and internals surveillance program

    International Nuclear Information System (INIS)

    Lucatero, Marco A.; Palacios-Hernandez, Javier C.; Ortiz-Villafuerte, Javier; Xolocostli-Munguia, J. Vicente; Gomez-Torres, Armando M.

    2010-01-01

    Materials surveillance programs are required to detect and prevent degradation of safety-related structures and components of a nuclear power reactor. In this work, following the directions in the Regulatory Guide 1.190, a calculational methodology is implemented as additional support for a reactor pressure vessel and internals surveillance program for a BWR. The choice of the neutronic methods employed was based on the premise of being able of performing all the expected future survey calculations in relatively short times, but without compromising accuracy. First, a geometrical model of a typical BWR was developed, from the core to the primary containment, including jet pumps and all other structures. The methodology uses the Synthesis Method to compute the three-dimensional neutron flux distribution. In the methodology, the code CORE-MASTER-PRESTO is used as the three-dimensional core simulator; SCALE is used to generate the fine-group flux spectra of the components of the model and also used to generate a 47 energy-groups job cross section library, collapsed from the 199-fine-group master library VITAMIN-B6; ORIGEN2 was used to compute the isotopic densities of uranium and plutonium; and, finally, DORT was used to calculate the two-dimensional and one-dimensional neutron flux distributions required to compute the synthesized three-dimensional neutron flux. Then, the calculation of fast neutron fluence was performed using the effective full power time periods through six operational fuel cycles of two BWR Units and until the 13th cycle for Unit 1. The results showed a maximum relative difference between the calculated-by-synthesis fast neutron fluxes and fluences and those measured by Fe, Cu and Ni dosimeters less than 7%. The dosimeters were originally located adjacent to the pressure vessel wall, as part of the surveillance program. Results from the computations of peak fast fluence on pressure vessel wall and specific weld locations on the core shroud are

  20. The BWR owners' group planning guide for life extension

    International Nuclear Information System (INIS)

    Smith, S.K.; Lehnert, D.F.; Locke, R.K.

    1991-01-01

    Extending the operating life of a commercial nuclear power plant has been shown to be economically beneficial to both the utility and the electric customer. As such, many utilities are planning and implementing plant life extension (PLEX) programs. A document has been developed which provides guidance to utilities in formulating a PLEX program plant for one or more boiling water reactor (BWR) plants. The guide has been developed by the BWR Owners' Group Plant Life Extension Committee. The principal bases for this guide were the BWR Pilot and Lead Plant Programs. These programs were used as models to develop the 'base plan' described in this guide. By formulating their program plant utilizing the base plan, utilities will be able to maximize the use of existing evaluations and results. The utility planner will build upon the base plan by adding any tasks or features that are unique to their programs. (author)

  1. Simulation of decreasing reactor power level with BWR simulator

    International Nuclear Information System (INIS)

    Suwoto; Zuhair; Rivai, Abu Khalid

    2002-01-01

    Study on characteristic of BWR using Desktop PC Based Simulator Program was analysed. This simulator is more efficient and cheaper for analyzing of characteristic and dynamic respond than full scope simulator for decreasing power level of BW. Dynamic responses of BWR reactor was investigated during the power level reduction from 100% FP (Full Power) which is 3926 MWth to 0% FP with 25% steps and 1 % FP/sec rate. The overall results for core flow rate, reactor steam flow, feed-water flow and turbine-generator power show tendency proportional to reduction of reactor power. This results show that reactor power control in BWR could be done by control of re-circulation flow that alter the density of water used as coolant and moderator. Decreasing the re-circulation flow rate will decrease void density which has negative reactivity and also affect the position of control rods

  2. An overview of the BWR ECCS strainer blockage issues

    International Nuclear Information System (INIS)

    Serkiz, A.W.; Marshall, M.L. Jr.; Elliott, R.

    1996-01-01

    This Paper provides a brief overview of actions taken in the mid 1980s to resolve Unresolved Safety Issue (USI) A-43, open-quotes Containment Emergency Sump Performance,close quotes and their relationship to the BWR strainer blockage issue; the importance of insights gained from the Barseback-2 (a Swedish BWR) incident in 1992 and from ECCS strainer testing and inspections at the Perry nuclear power plant in 1992 and 1993; an analysis of an US BWR/4 with a Mark I containment; an international community sharing of knowledge relevant to ECCS strainer blockage, additional experimental programs; and identification of actions needed to resolve the strainer blockage issue and the status of such efforts

  3. Evaluation of stress corrosion crack growth in BWR piping systems

    International Nuclear Information System (INIS)

    Kassir, M.; Sharma, S.; Reich, M.; Chang, M.T.

    1985-05-01

    This report presents the results of a study conducted to evaluate the effects of stress intensity factor and environment on the growth behavior of intergranular stress corrosion cracks in type 304 stainless steel piping systems. Most of the detected cracks are known to be circumferential in shape, and initially started at the inside surface in the heat affected zone near girth welds. These cracks grow both radially in-depth and circumferentially in length and, in extreme cases, may cause leakage in the installation. The propagation of the crack is essentially due to the influence of the following simultaneous factors: (1) the action of applied and residual stress; (2) sensitization of the base metal in the heat affected zone adjacent to girth weld; and (3) the continuous exposure of the material to an aggressive environment of high temperature water containing dissolved oxygen and some levels of impurities. Each of these factors and their effects on the piping systems is discussed in detail in the report. The report also evaluates the time required for hypothetical cracks in BWR pipes to propagate to their critical size. The pertinent times are computed and displayed graphically. Finally, parametric study is performed in order to assess the relative influence and sensitivity of the various input parameters (residual stress, crack growth law, diameter of pipe, initial size of defect, etc.) which have bearing on the growth behavior of the intergranular stress corrosion cracks in type 304 stainless steel. Cracks in large-diameter as well as in small-diameter pipes are considered and analyzed. 27 refs., 25 figs., 10 tabs

  4. The BWR VIP role in license renewal

    International Nuclear Information System (INIS)

    Dyle, R.

    2001-01-01

    The full text follows. The Boiling Water Reactor Vessel and Internals Project (BWRVIP) was started in response to an increase in the occurrence of intergranular stress corrosion cracking (IGSCC) in BWR reactor pressure vessel (RPV) internal components. The BWRVIP first evaluated the internals to determine which components were necessary to assure safe operation. An assessment of the relative significance of the internals was then performed to establish the priority in which components would be evaluated. Once this was determined, each safety-related component was evaluated to determine what, if any, inspections or tests were necessary to assure component integrity. Although IGSCC was the initial degradation mechanism of concern for RPV internals, the individual component evaluations considered all known modes of failure (fatigue, stress corrosion cracking, neutron embrittlement, etc). The component evaluations also considered all potential failure locations and the susceptibility to degradation. Once the potential failure locations and mechanisms were identified, the BWRVIP developed inspection criteria to assess component condition. The BWRVIP also developed flaw evaluation methodologies that could be used to determine the integrity and remaining life of each component. All of this information was consolidated into a document called an Inspection and Flaw Evaluation (IE) Guideline for each component. At the same time the BWRVIP was developing its program to assure internals integrity, utilities began to seriously consider measures necessary to extend the life of the plants. In the United States, the USNRC promulgated rules to allow the renewal of a license to allow plant operation for an additional 20 years. One aspect of the rule was that management of age-related degradation in the renewal period must be performed. The timing of this ''license renewal rule'' was advantageous in that it allowed the BWRVIP to address the requirements of the rule in the development

  5. Peach Bottom transient analysis with BWR TRACB02

    International Nuclear Information System (INIS)

    Alamgir, M.; Sutherland, W.A.

    1984-01-01

    TRAC calculations have been performed for a Turbine Trip transient (TT1) in the Peach Bottom BWR power plant. This study is a part of the qualification of the BWR-TRAC code. The simulation is aimed at reproducing the observed thermal hydraulic behavior in a pressurization transient. Measured core power is an input to the calculation. Comparison with data show the code reasonably well predicts the generation and propagation of the pressure waves in the main steam line and associated pressurization of the reactor vessel following the closure of the turbine stop valve

  6. BWR plant dynamic analysis code BWRDYN user's manual

    International Nuclear Information System (INIS)

    Yokobayashi, Masao; Yoshida, Kazuo; Fujiki, Kazuo

    1989-06-01

    Computer code BWRDYN has been developed for thermal-hydraulic analysis of a BWR plant. It can analyze the various types of transient caused by not only small but also large disturbances such as operating mode changes and/or system malfunctions. The verification of main analytical models of the BWRDYN code has been performed with measured data of actual BWR plant. Furthermore, the installation of BOP (Balance of Plant) model has made it possible to analyze the effect of BOP on reactor system. This report describes on analytical models and instructions for user of the BWRDYN code. (author)

  7. Modern technology applied in the advanced BWR (ABWR)

    International Nuclear Information System (INIS)

    Hucik, S.A.

    1988-01-01

    The advanced boiling water reactor (ABWR) represents the next generation of light water reactors (LWR) to be introduced into commercial operation in the 1990's. The ABWR is the result of the continuing evolution of the BWR, incorporating state-of-the-art technology and improvements based on worldwide experience, and extensive design and test and development programs. This paper discusses how the ABWR development objective focused on an optimized selection of advanced technologies and proven BWR technologies. A technical evaluation of the ABWR shows its superiority in terms of performance characteristics and economics relative to current LWR designs

  8. PWR and BWR light water reactor systems in the USA and their fuel cycle

    International Nuclear Information System (INIS)

    Crawford, W.D.

    1977-01-01

    Light water reactor operating experience in the USA can be considered to date from the choice of the pressurized water reactor (PWR) for use in the naval reactor program and the subsequent construction and operation of the nuclear power plant at Shippingport, Pennsylvania in 1957. The development of the boiling water reactor (BWR) in 1954 and its selection for the plant at Dresden, Illinois in 1959 established this concept as the other major reactor type in the US nuclear power program. The subsequent growth profile is presented, leading to 31 PWR's and 23 BWR's currently in operation as well as to plants in the planning and construction phase. A significant operating record has been accumulated concerning the availability of each of these reactor types as determined by: (1) outage for refueling, (2) component reliability, (3) maintenance requirements, and (4) retrofitting required by government regulation. In addition, the use and performance of BWR's and PWR's in meeting system load requirements is discussed. The growing concern regarding possible terrorist activities and other potential threats has resulted in systems and procedures designed to assure effective safeguards at nuclear power installations. Safeguards measures currently in place are described. Environmental effects of operating plants are subject to both radiological and non-radiological monitoring to verify that results are within the limits established in the licensing process. The operating results achieved and the types of modifications that have been required of operating plants by the Nuclear Regulatory Commission are reviewed. The PWR and BWR Fuel Cycle is examined in terms of: (1) fuel burnup experience and prospects for improvement, (2) the status and outlook for natural uranium resources, (3) enrichment capacity, (4) reprocessing and recycle, and the interrelationships among the latter three factors. High level waste management currently involving on-site storage of spent fuel is discussed

  9. BWR stability using a reducing dynamical model; Estabilidad de un BWR con un modelo dinamico reducido

    Energy Technology Data Exchange (ETDEWEB)

    Ballestrin Bolea, J M; Blazquez Martinez, J B

    1990-07-01

    BWR stability can be treated with reduced order dynamical models. When the parameters of the model came from dynamical models. When the parameters of the model came from experimental data, the predictions are accurate. In this work an alternative derivation for the void fraction equation is made, but remarking the physical structure of the parameters. As the poles of power/reactivity transfer function are related with the parameters, the measurement of the poles by other techniques such as noise analysis will lead to the parameters, but the system of equations is non-linear. Simple parametric calculation of decay ratio are performed, showing why BWRs become unstable when they are operated at low flow and high power. (Author)

  10. Development of a detailed BWR core thermal-hydraulic analysis method based on the Japanese post-BT standard using a best-estimate code

    International Nuclear Information System (INIS)

    Ono, H.; Mototani, A.; Kawamura, S.; Abe, N.; Takeuchi, Y.

    2004-01-01

    The post-BT standard is a new fuel integrity standard or the Atomic Energy Society of Japan that allows temporary boiling transition condition in the evaluation for BWR anticipated operational occurrences. For application of the post-BT standard to BWR anticipated operational occurrences evaluation, it is important to identify which fuel assemblies and which axial, radial positions of fuel rods have temporarily experienced the post-BT condition and to evaluates how high the fuel cladding temperature rise was and how long the dryout duration continued. Therefore, whole bundle simulation, in which each fuel assembly is simulated independently by one thermal-hydraulic component, is considered to be an effective analytical method. In the present study, a best-estimate thermal-hydraulic code, TRACG02, has been modified to extend it predictive capability by implementing the post-BT evaluation model such as the post-BT heat transfer correlation and rewetting correlation and enlarging the number of components used for BWR plant simulation. Based on new evaluation methods, BWR core thermal-hydraulic behavior has been analyzed for typical anticipated operational occurrence conditions. The location where boiling transition occurs and the severity of fuel assembly in the case of boiling transition conditions such as fuel cladding temperature, which are important factors in determining whether the reuse of the fuel assembly can be permitted, were well predicted by the proposed evaluation method. In summary, a new evaluation method for a detailed BWR core thermal-hydraulic analysis based on the post-BT standard of the Atomic Energy Society of Japan has been developed and applied to the evaluation of the post-BT standard during the actual BWR plant anticipated operational occurrences. (author)

  11. Condensate treatment in BWR circuits by filter demineralizer units using powdered ion exchange resin at medium and high temperature

    International Nuclear Information System (INIS)

    De Martino, R.

    1983-01-01

    Considering the radiation build-up in some BWR reactors, we make a correlation between this phenomenon and the condensate purification system applied and the point of its utilization into the circuits. The application temperature of such a plant seems to have a very important role on the equilibria of metals contained in the reactor water and on the oxide composition. The efficiency of the condensate polishing system and the corrosion control are the most interesting objectives to achieve and to maintain, to control and regulate the physical and chemical process in the feedwater and in the reactor water. Up to date the technology owns major knowledge and a consistent know-how on using chemical products in order to increase the condensate polishing system efficiency. It is also considered a typical parallel case of a conventional power station and a secondary system of BWR units. (author)

  12. Experience and development of on-line BWR surveillance system at Onagawa nuclear power station unit-1

    International Nuclear Information System (INIS)

    Kishi, A.; Chiba, K.; Kato, K.; Ebata, S.; Ando, Y.; Sakamoto, H.

    1986-01-01

    ONAGAWA nuclear power station Unit-1 (Tohoku Electric Power Co.) is a BWR-4 nuclear power station of 524 MW electric power which started commercial operation in June 1984. To attain high reliability and applicability for ONAGAWA-1, Tohoku Electric Power Co. and Toshiba started a Research and Development project on plant surveillance and diagnosis from April 1982. Main purposes of this project are to: (1) Develop an on-line surveillance system and acquire its operating experience at a commercial BWR, (2) Assist in plant operation and maintenance by data acquisition and analysis, (3) Develop a new technique for plant surveillance and diagnosis. An outline of the project, operating experience gained from the on-line surveillance system and an introduction to new diagnosis techniques are reported in this paper. (author)

  13. BWR stability: analysis of cladding temperature for high amplitude oscillations - 146

    International Nuclear Information System (INIS)

    Pohl, P.; Wehle, F.

    2010-01-01

    Power oscillations associated with density waves in boiling water reactors (BWRs) have been studied widely. Industrial research in this area is active since the invention of the first BWR. Stability measurements have been performed in various plants during commissioning phase but especially the magnitude and divergent nature of the oscillations during the LaSalle Unit 2 nuclear power plant event on March 9, 1988, renewed concern about the state of knowledge on BWR instabilities and possible consequences to fuel rod integrity. The objective of this paper is to present a simplified stability tool, applicable for stability analysis in the non-linear regime, which extends to high amplitude oscillations where inlet reverse flow occurs. In case of high amplitude oscillations a cyclical dryout and rewetting process at the fuel rod may take place, which leads in turn to rapid changes of the heat transfer from the fuel rod to the coolant. The application of this stability tool allows for a conservative determination of the fuel rod cladding temperature in case of high amplitude oscillations during the dryout / re-wet phase. Moreover, it reveals in good agreement to experimental findings the stabilizing effect of the reverse bundle inlet flow, which might be obtained for large oscillation amplitudes. (authors)

  14. Strain-induced corrosion cracking in ferritic components of BWR primary circuits

    International Nuclear Information System (INIS)

    Seifert, H.-P.; Ritter, S.; Ineichen, U.; Tschanz, U.; Gerodetti, B.

    2003-04-01

    The present final report of the RIKORR project is a summary of a literature survey and of the experimental work performed by PSI on the environmentally-assisted cracking (EAC) and dynamic strain ageing (DSA) susceptibility of low-alloy steels (LAS) in high-temperature (HT) water. Within this project, the EAC crack growth behaviour of different low-alloy RPV steels, weld filler and weld heat-affected zone materials has been investigated under simulated transient and steady-state BWR/NWC power operation conditions. The strain-induced corrosion cracking (SICC) / low-frequency corrosion fatigue (CF) and stress corrosion cracking (SCC) crack growth behaviour of different low-alloy RPV steels under simulated transient and stationary BWR/NWC conditions was characterized by slow rising load / low-frequency corrosion fatigue and constant load / periodical partial unloading / ripple load tests with pre-cracked fracture mechanics specimens in oxygenated HT water at temperatures of either 288, 250, 200 or 150 o C. Modern high-temperature water loops, on-line crack growth monitoring and fractographic analysis by scanning electron microscopy (SEM) were used to quantify the cracking response. (author)

  15. Evaluation of PWR and BWR pin cell benchmark results

    International Nuclear Information System (INIS)

    Pijlgroms, B.J.; Gruppelaar, H.; Janssen, A.J.; Hoogenboom, J.E.; Leege, P.F.A. de; Voet, J. van der; Verhagen, F.C.M.

    1991-12-01

    Benchmark results of the Dutch PINK working group on PWR and BWR pin cell calculational benchmark as defined by EPRI are presented and evaluated. The observed discrepancies are problem dependent: a part of the results is satisfactory, some other results require further analysis. A brief overview is given of the different code packages used in this analysis. (author). 14 refs., 9 figs., 30 tabs

  16. Evaluation of PWR and BWR pin cell benchmark results

    Energy Technology Data Exchange (ETDEWEB)

    Pijlgroms, B.J.; Gruppelaar, H.; Janssen, A.J. (Netherlands Energy Research Foundation (ECN), Petten (Netherlands)); Hoogenboom, J.E.; Leege, P.F.A. de (Interuniversitair Reactor Inst., Delft (Netherlands)); Voet, J. van der (Gemeenschappelijke Kernenergiecentrale Nederland NV, Dodewaard (Netherlands)); Verhagen, F.C.M. (Keuring van Electrotechnische Materialen NV, Arnhem (Netherlands))

    1991-12-01

    Benchmark results of the Dutch PINK working group on PWR and BWR pin cell calculational benchmark as defined by EPRI are presented and evaluated. The observed discrepancies are problem dependent: a part of the results is satisfactory, some other results require further analysis. A brief overview is given of the different code packages used in this analysis. (author). 14 refs., 9 figs., 30 tabs.

  17. Requests on domestic nuclear data library from BWR design

    International Nuclear Information System (INIS)

    Maruyama, Hiromi

    2003-01-01

    Requests on the domestic nuclear data library JENDL and activities of the Nuclear Data Center have been presented from the perspective of BWR design and design code development. The requests include a standard multi-group cross section library, technical supports, and clarification of advantage of JENDL as well as requests from physical aspects. (author)

  18. BWR ATWS mitigation by Fine Motion Control Rod

    International Nuclear Information System (INIS)

    Rohatgi, U.S.; Cheng, H.S.; Khan, H.; Mallen, A.; Diamond, D.

    1994-01-01

    Two main methods of ATWS mitigation in a SBWR are: fine Motion control Rods (FMCRD) and Boron injection via the Standby Liquid control System (SLCS). This study has demonstrated that the use of FMCRD along with feedwater runback mitigated the conditions due to reactivity insertion and possible ATWS in a BWR which is similar to SBWR

  19. Material operating behaviour of ABB BWR control rods

    International Nuclear Information System (INIS)

    Rebensdorff, B.; Bart, G.

    2000-01-01

    The BWR control rods made by ABB use boron carbide (B 4 C and hafnium as absorber material within a cladding of stainless steel. The general behaviour under operation has proven to be very good. ABB and many of their control rod customers have performed extensive inspection programs of control rod behaviour. However, due to changes in the material properties under fast and thermal neutron irradiation defects may occur in the control rods at high neutron fluences. Examinations of irradiated control rod materials have been performed in hot cell laboratories. The examinations have revealed the defect mechanism Irradiation Assisted Stress Corrosion Cracking (IASCC) to appear in the stainless steel cladding. For IASCC to occur three factors have to act simultaneously. Stress, material sensitization and an oxidising environment. Stress may be obtained from boron carbide swelling due to irradiation. Stainless steel may be sensitized to intergranular stress corrosion cracking under irradiation. Normally the reactor environment in a BWR is oxidising. The presentation focuses on findings from hot cell laboratory work on irradiated ABB BWR control rods and studies of irradiated control rod materials in the hot cells at PSI. Apart from physical, mechanical and microstructural examinations, isotope analyses were performed to describe the local isotopic burnup of boron. Consequences (such as possible B 4 C washout) of a under operation in a ABB BWR, after the occurrence of a crack is discussed based on neutron radiographic examinations of control rods operated with cracks. (author)

  20. Detection of failed fuel rods in shrouded BWR fuel assemblies

    International Nuclear Information System (INIS)

    Baero, G.; Boehm, W.; Goor, B.; Donnelly, T.

    1988-01-01

    A manipulator and an ultrasonic testing (UT) technique were developed to identify defective fuel rods in shrouded BWR fuel assemblies. The manipulator drives a UT probe axially through the bottom tie plate into the water channels between the fuel rods. The rotating UT probe locates defective fuel rods by ingressed water which attenuates the UT-signal. (author)

  1. Transmutation of minor actinide using thorium fueled BWR core

    International Nuclear Information System (INIS)

    Susilo, Jati

    2002-01-01

    One of the methods to conduct transmutation of minor actinide is the use of BWR with thorium fuel. Thorium fuel has a specific behaviour of producing a little secondary minor actinides. Transmutation of minor actinide is done by loading it in the BWR with thorium fuel through two methods, namely close recycle and accumulation recycle. The calculation of minor actinide composition produced, weigh of minor actinide transmuted, and percentage of reminder transmutation was carried SRAC. The calculations were done to equivalent cell modeling from one fuel rod of BWR. The results show that minor actinide transmutation is more effective using thorium fuel than uranium fuel, through both close recycle and accumulation recycle. Minor actinide transmutation weight show that the same value for those recycle for 5th recycle. And most of all minor actinide produced from 5 unit BWR uranium fuel can transmuted in the 6 t h of close recycle. And, the minimal value of excess reactivity of the core is 12,15 % Δk/k, that is possible value for core operation

  2. Power plant design: ESBWR - the latest passive BWR

    International Nuclear Information System (INIS)

    Arnold, H.; Yadigaroglu, G.; Stoop, P.C.

    1997-01-01

    When General Electric said it would end development of its 670 MWe SBWR (Simplified Boiling Water Reactor), it was not quite the end of the story. Also on the drawing board at the time was the larger ESBWR (standing for either European or Economic Simplified BWR) whose goal was to provide the improved economic performance that the SBWR could not. (UK)

  3. Advanced methods for BWR transient and stability analysis

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, A; Wehle, F; Opel, S; Velten, R [AREVA, AREVA NP, Erlangen (Germany)

    2008-07-01

    The design of advanced Boiling Water Reactor (BWR) fuel assemblies and cores is governed by the basic requirement of safe, reliable and flexible reactor operation with optimal fuel utilization. AREVA NP's comprehensive steady state and transient BWR methodology allows the designer to respond quickly and effectively to customer needs. AREVA NP uses S-RELAP5/RAMONA as the appropriate methodology for the representation of the entire plant. The 3D neutron kinetics and thermal-hydraulics code has been developed for the prediction of system, fuel and core behavior and provides additional margins for normal operation and transients. Of major importance is the extensive validation of the methodology. The validation is based on measurements at AREVA NP's test facilities, and comparison of the predictions with a great wealth of measured data gathered from BWR plants during many years of operation. Three of the main fields of interest are stability analysis, operational transients and reactivity initiated accidents (RIAs). The introduced 3D methodology for operational transients shows significant margin regarding the operational limit of critical power ratio, which has been approved by the German licensing authority. Regarding BWR stability a large number of measurements at different plants under various conditions have been performed and successfully post-calculated with RAMONA. This is the basis of reliable pre-calculations of the locations of regional and core-wide stability boundaries. (authors)

  4. Advanced methods for BWR transient and stability analysis

    International Nuclear Information System (INIS)

    Schmidt, A.; Wehle, F.; Opel, S.; Velten, R.

    2008-01-01

    The design of advanced Boiling Water Reactor (BWR) fuel assemblies and cores is governed by the basic requirement of safe, reliable and flexible reactor operation with optimal fuel utilization. AREVA NP's comprehensive steady state and transient BWR methodology allows the designer to respond quickly and effectively to customer needs. AREVA NP uses S-RELAP5/RAMONA as the appropriate methodology for the representation of the entire plant. The 3D neutron kinetics and thermal-hydraulics code has been developed for the prediction of system, fuel and core behavior and provides additional margins for normal operation and transients. Of major importance is the extensive validation of the methodology. The validation is based on measurements at AREVA NP's test facilities, and comparison of the predictions with a great wealth of measured data gathered from BWR plants during many years of operation. Three of the main fields of interest are stability analysis, operational transients and reactivity initiated accidents (RIAs). The introduced 3D methodology for operational transients shows significant margin regarding the operational limit of critical power ratio, which has been approved by the German licensing authority. Regarding BWR stability a large number of measurements at different plants under various conditions have been performed and successfully post-calculated with RAMONA. This is the basis of reliable pre-calculations of the locations of regional and core-wide stability boundaries. (authors)

  5. Decay ratio studies in BWR and PWR using wavelet

    International Nuclear Information System (INIS)

    Ciftcioglu, Oe.

    1996-10-01

    The on-line stability of BWR and PWR is studied using the neutron noise signals as the fluctuations reflect the dynamic characteristics of the reactor. Using appropriate signal modeling for time domain analysis of noise signals, the stability parameters can be directly obtained from the system impulse response. Here in particular for BWR, an important stability parameter is the decay ratio (DR) of the impulse response. The time series analysis involves the autoregressive modeling of the neutron detector signal. The DR determination is strongly effected by the low frequency behaviour since the transfer function characteristic tends to be a third order system rather than a second order system for a BWR. In a PWR low frequency behaviour is modified by the Boron concentration. As a result of these phenomena there are difficulties in the consistent determination of the DR oscillations. The enhancement of the consistency of this DR estimation is obtained by wavelet transform using actual power plant data from BWR and PWR. A comparative study of the Restimation with and without wavelets are presented. (orig.)

  6. Operator training simulator for BWR nuclear power plant

    International Nuclear Information System (INIS)

    Watanabe, Tadasu

    1988-01-01

    For the operation management of nuclear power stations with high reliability and safety, the role played by operators is very important. The effort of improving the man-machine interface in the central control rooms of nuclear power stations is energetically advanced, but the importance of the role of operators does not change. For the training of the operators of nuclear power stations, simulators have been used from the early stage. As the simulator facilities for operator training, there are the full scope simulator simulating faithfully the central control room of an actual plant and the small simulator mainly aiming at learning the plant functions. For BWR nuclear power stations, two full scope simulators are installed in the BWR Operator Training Center, and the training has been carried out since 1974. The plant function learning simulators have been installed in respective electric power companies as the education and training facilities in the companies. The role of simulators in operator training, the BTC No.1 simulator of a BWR-4 of 780 MWe and the BTC No.2 simulator of a BWR-5 of 1,100 MWe, plant function learning simulators, and the design of the BTC No.2 simulator and plant function learning simulators are reported. (K.I.)

  7. Characteristics of fluctuating pressure generated in BWR main steam lines

    International Nuclear Information System (INIS)

    Takahashi, Shiro; Okuyama, Keita; Tamura, Akinori

    2009-01-01

    The BWR-3 steam dryer in the Quad Cities Unit 2 Nuclear Power Plant was damaged by high cycle fatigue due to acoustic-induced vibration. The dryer failure was as attributed to flow-induced acoustic resonance at the stub pipes of safety relief valves (SRVs) in the main steam lines (MSLs). The acoustic resonance was considered to be generated by interaction between the sound field and an unstable shear layer across the closed side branches with SRV stub pipes. We have started a research program on BWR dryers to develop their loading evaluation methods. Moreover, it has been necessary to evaluate the dryer integrity of BWR-5 plants which are the main type of BWR in Japan. In the present study, we used 1/10-scale BWR tests and analyses to investigate the flow-induced acoustic resonance and acoustic characteristics in MSLs. The test apparatus consisted of a steam dryer, a steam dome and 4 MSLs with 20 SRV stub pipes. A finite element method (FEM) was applied for the calculation of three-dimensional wave equations in acoustic analysis. We demonstrated that remarkable fluctuating pressures occurred in high and low frequency regions. High frequency fluctuating pressures was generated by the flow-induced acoustic resonance in the SRV stub pipes. Low frequency fluctuating pressure was generated in an MSL with the dead leg. The frequency of the latter almost coincided with the natural frequency of the MSL with the dead leg. The amplitude of the fluctuating pressures in the multiple stub pipes became more intense because of interaction between them compared with that in the single stub pipe. Acoustic analysis results showed that the multiple stub pipes caused several natural frequencies in the vicinity of the natural frequency of the single stub pipe and several modes of the standing wave in the MSLs. (author)

  8. Metallurgical factors that contribute to cracking in BWR piping

    International Nuclear Information System (INIS)

    Weeks, J.R.

    1975-01-01

    During the fall of 1974 and early winter of 1975, cracks have been discovered in the 4 in. bypass lines of several Boiling Water Reactors (BWR's) in the United States. Further, similar cracks were discovered at two BWR's in Japan during the same period. More recently, cracks have been discovered in the core spray piping and in a furnace-sensitized ''safe end'' and adjacent ''dutchman'' at the Dresden Nuclear Power Station, Unit No. 2. Although inspections at all other U.S. BWR's have not disclosed further instances of cracking in core spray piping, leaking cracks have been found in the core spray piping of two BWR's overseas. Metallurgical examinations of these cracks are not yet complete. The following observations have been made to date. All cracks (except those in the furnace-sensitized safe end and dutchman) occurred in seamless type 304 stainless steel piping or in elbows fabricated from such piping, in the outer heat affected zone of either field or shop welds, in lines isolated from the main primary coolant flow during full power operation, except for the not yet examined cracks in the Monticello bypass lines. The cracks are exclusively intergranular, and occur in metal that has been lightly sensitized by the welding process, with only intermittent grain boundary carbides. They developed in the areas of peak axial residual stresses from welding rather than in the most heavily sensitized areas. No fatigue striations have been found on the fracture surfaces. The evidence received to date strongly indicates that these cracks were caused by intergranular stress corrosion of weld-sensitized stainless steel by BWR water containing greater than 0.2 ppM oxygen. The possible role of fatigue or alternating stresses in this corrosion is not clear. Further, not all the cracks detected to date necessarily have occurred by the same mechanism

  9. Lead plant application of leak-before-break to high energy piping. Final report, January 1989

    International Nuclear Information System (INIS)

    1989-01-01

    This report presents the experience gained during a successful application of a leak-before-break program by Duquesne Light Company. This program was directed at the high energy nuclear piping at Beaver Valley Power Station - Unit 2. This experience can be applied to other nuclear plant leak-before-break efforts in order to minimize the number of pipe whip restraints, jet impingement shields, snubbers, and to discount the consideration of remaining pipe rupture dynamic effects. The chronology of events leading to Nuclear Regulatory Commission approval of the Beaver Valley Power Station - Unit 2 lead plant effort is described. The final report and pertinent sections of the final Safety Evaluation Report are also included. (author)

  10. Estimation of dose rate around the spent control rods of a BWR; Estimacion de la rapidez de dosis alrededor de las barras de control gastadas de un BWR

    Energy Technology Data Exchange (ETDEWEB)

    Cancino P, G.

    2016-10-01

    The energy can come from fossil renewable sources (solar (natural gas, oil), wind, hydro, tidal, geothermal, biomass, bio energy and nuclear. Nuclear power can be obtained by fission reactions and fusion (still under investigation) atomic nuclei. Fission, is a partition of a very heavy nucleus (Uranium 235, for example) into two lighter nuclei. Much of the world's electric power is generated from the energy released by fission processes. In a nuclear power reactor, light water as the BWR, there are many important elements that allow safe driving operation, one of them are the elements or control systems, the burnable poison or neutron absorber inherently allow control power reactor. The control rods, which consist mostly of stainless steel and absorbing elements (such as boron carbide, hafnium, cadmium, among others) of thermal neutrons is able to initiate, regulate or stop the reactor power. These, due to the use of depleted burned or absorbing material and therefore reach their lifespan, which can be 15 years or have other values depending on the manufacturer. Control rods worn should be removed, stored or confined in expressly places. Precisely at this stage arises the importance of knowing their radiological condition to manipulate safely and without incident to the people health responsible for conducting these proceedings state arises. This thesis consists in the estimation of the dose rate in spent control rod made of boron carbide, from a typical BWR reactor. It will be estimated by direct radiation measurements with measurement equipment for radiotherapy ionization chamber, in six spent control rods, which were taken at different reactor operating cycles and are in a spent fuel pool. Using bracket electromechanical and electronic equipment for positioning and lifting equipment for radiation measurement around the control rod in the axial and radial arrangement for proper scanning. Finally will be presented a graphic corresponding to the dose

  11. Design and axial optimization of nuclear fuel for BWR reactors

    International Nuclear Information System (INIS)

    Garcia V, M.A.

    2006-01-01

    In the present thesis, the modifications made to the axial optimization system based on Tabu Search (BT) for the axial design of BWR fuel type are presented, developed previously in the Nuclear Engineering Group of the UNAM Engineering Faculty. With the modifications what is mainly looked is to consider the particular characteristics of the mechanical design of the GE12 fuel type, used at the moment in the Laguna Verde Nucleo electric Central (CNLV) and that it considers the fuel bars of partial longitude. The information obtained in this thesis will allow to plan nuclear fuel reloads with the best conditions to operate in a certain cycle guaranteeing a better yield and use in the fuel burnt, additionally people in charge in the reload planning will be favored with the changes carried out to the system for the design and axial optimization of nuclear fuel, which facilitate their handling and it reduces their execution time. This thesis this developed in five chapters that are understood in the following way in general: Chapter 1: It approaches the basic concepts of the nuclear energy, it describes the physical and chemical composition of the atoms as well as that of the uranium isotopes, the handling of the uranium isotope by means of the nuclear fission until arriving to the operation of the nuclear reactors. Chapter 2: The nuclear fuel cycle is described, the methods for its extraction, its conversion and its enrichment to arrive to the stages of the nuclear fuel management used in the reactors are described. Beginning by the radial design, the axial design and the core design of the nuclear reactor related with the fuel assemblies design. Chapter 3: the optimization methods of nuclear fuel previously used are exposed among those that are: the genetic algorithms method, the search methods based on heuristic rules and the application of the tabu search method, which was used for the development of this thesis. Chapter 4: In this part the used methodology to the

  12. Two types of a passive safety containment for a near future BWR with active and passive safety systems

    International Nuclear Information System (INIS)

    Sato, Takashi; Akinaga, Makoto; Kojima, Yoshihiro

    2009-01-01

    The paper presents two types of a passive safety containment for a near future BWR. They are named Mark S and Mark X containment. One of their common merits is very low peak pressure at severe accidents without venting the containment atmosphere to the environment. The PCV pressure can be moderated within the design pressure. Another merit is the capability to submerge the PCV and the RPV above the core level. The third merit is robustness against external events such as a large commercial airplane crash. Both the containments have a passive cooling core catcher that has radial cooling channels. The Mark S containment is made of reinforced concrete and applicable to a large power BWR up to 1830 MWe. The Mark X containment has the steel secondary containment and can be cooled by natural circulation of outside air. It can accommodate a medium power BWR up to 1380 MWe. In both cases the plants have active and passive safety systems constituting in-depth hybrid safety (IDHS). The IDHS provides not only hardware diversity between active and passive safety systems but also more importantly diversity of the ultimate heat sinks between the atmosphere and the sea water. Although the plant concept discussed in the paper uses well-established technology, plant performance including economy is innovatively and evolutionally improved. Nothing is new in the hardware but everything is new in the performance.

  13. Two types of a passive safety containment for a near future BWR with active and passive safety systems

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Takashi [Toshiba Corporation, IEC, Gen-SS, 8, Shinsugita-ho, Isogo-ku, Yokohama (Japan)], E-mail: takashi44.sato@glb.toshiba.co.jp; Akinaga, Makoto; Kojima, Yoshihiro [Toshiba Corporation, IEC, Gen-SS, 8, Shinsugita-ho, Isogo-ku, Yokohama (Japan)

    2009-09-15

    The paper presents two types of a passive safety containment for a near future BWR. They are named Mark S and Mark X containment. One of their common merits is very low peak pressure at severe accidents without venting the containment atmosphere to the environment. The PCV pressure can be moderated within the design pressure. Another merit is the capability to submerge the PCV and the RPV above the core level. The third merit is robustness against external events such as a large commercial airplane crash. Both the containments have a passive cooling core catcher that has radial cooling channels. The Mark S containment is made of reinforced concrete and applicable to a large power BWR up to 1830 MWe. The Mark X containment has the steel secondary containment and can be cooled by natural circulation of outside air. It can accommodate a medium power BWR up to 1380 MWe. In both cases the plants have active and passive safety systems constituting in-depth hybrid safety (IDHS). The IDHS provides not only hardware diversity between active and passive safety systems but also more importantly diversity of the ultimate heat sinks between the atmosphere and the sea water. Although the plant concept discussed in the paper uses well-established technology, plant performance including economy is innovatively and evolutionally improved. Nothing is new in the hardware but everything is new in the performance.

  14. Fast measurements of the in-core coolant velocity in a BWR by neutron noise analysis

    International Nuclear Information System (INIS)

    Hagen, T.H.J.J. van der; Hoogenboom, J.E.

    1988-01-01

    A method to determine in-core coolant velocities from neutron noise within short time intervals has been developed. The accuracy of the method was determined by using a simulation set-up and by using signals of a twin self-powered neutron detector installed in the core of the Dodewaard BWR in the Netherlands. In-core coolant velocities can be estimated within 2.5 s with a standard deviation (due to statistics) less than 2.1%. The method is suitable for velocity monitoring as is shown by the application to a stepwise velocity change of the coolant in a model of a coolant channel of a BWR. The presented technique was applied to determine the variations of the coolant velocity in the Dodewaard core during normal operation and during pressure steps. Only minor variations of the coolant velocity were detected during normal reactor conditions. An increase of those variations with pressure lowering - indicating a lower thermal hydraulic stability - could be detected. A clear velocity response to pressure steps could be determined which was also reflected in the cross-spectrum of the velocity with the vessel pressure and with the in-core neutron flux. (author)

  15. Completion of high-efficiency BWR turbine plant 'Hamaoka unit No. 4'

    International Nuclear Information System (INIS)

    Tsuji, Kunio; Hamaura, Norikazu; Shibashita, Naoaki; Kazama, Seiichi

    1995-01-01

    Accompanying the increase of capacity of nuclear power plants in Japan, the plants having heightened economical efficiency, which are supported by the improvement of thermal efficiency and the reduction of dose, are demanded. Hitachi Ltd. has completed No. 4 turbine unit of 1137 MW output in Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., which is the largest capacity machine in Japanese BWR plants. In this unit, the moisture separator heater, the steam turbine with high efficiency, and the hollow thread film condensate filter which treats the total flow rate of condensate are used as the reheating type BWR plant for the first time in Japan, and the plan of heightened economy and operation was adopted. It was confirmed by the trial for about 10 months that the planned performance was sufficiently satisfied, and the commercial operation was started in September, 1993. The features of the 1137 MW turbine unit are explained. The turbine is of tandem six-flow exhaust condensation type. Diffuser type low pressure turbine exhaust chambers, butterfly type combination intermediate valve are adopted. The stages with the blades having moisture-separating grooves were corrected. The reliability of the shaft system was improved. The adoption of the moisture separator heater and the application of the hollow thread film type condensate filter are explained. (K.I.)

  16. Improvement technique of sensitized HAZ by GTAW cladding applied to a BWR power plant

    International Nuclear Information System (INIS)

    Tujimura, Hiroshi; Tamai, Yasumasa; Furukawa, Hideyasu; Kurosawa, Kouichi; Chiba, Isao; Nomura, Keiichi.

    1995-01-01

    A SCC(Stress Corrosion Cracking)-resistant technique, in which the sleeve installed by expansion is melted by GTAW process without filler metal with outside water cooling, was developed. The technique was applied to ICM (In-Core Monitor) housings of a BWR power plant in 1993. The ICM housings of which materials are type 304 Stainless Steels are sensitized with high tensile residual stresses by welding to the RPV (Reactor Pressure Vessel). As the result, ICM housings have potential of SCC initiation. Therefore, the improvement technique resistant to SCC was needed. The technique can improve chemical composition of the housing inside and residual stresses of the housing outside at the same time. Sensitization of the housing inner surface area is eliminated by replacing low-carbon with proper-ferrite microstructure clad. High tensile residual stresses of housing outside surface area is improved into compressive side. Compressive stresses of outside surface are induced by thermal stresses which are caused by inside cladding with outside water cooling. The clad is required to be low-carbon metal with proper ferrite and not to have the new sensitized HAZ (Heat Affected Zone) on the surface by cladding. The effect of the technique was qualified by SCC test, chemical composition check, ferrite content measurement and residual stresses measurement etc. All equipment for remote application were developed and qualified, too. The technique was successfully applied to a BWR plant after sufficient training

  17. Quantitative evaluation for training results of nuclear plant operator on BWR simulator

    International Nuclear Information System (INIS)

    Sato, Takao; Sato, Tatsuaki; Onishi, Hiroshi; Miyakita, Kohji; Mizuno, Toshiyuki

    1985-01-01

    Recently, the reliability of neclear power plants has largely risen, and the abnormal phenomena in the actual plants are rarely encountered. Therefore, the training using simulators becomes more and more important. In BWR Operator Training Center Corp., the training of the operators of BWR power plants has been continued for about ten years using a simulator having the nearly same function as the actual plants. The recent high capacity ratio of nuclear power plants has been mostly supported by excellent operators trained in this way. Taking the opportunity of the start of operation of No.2 simulator, effort has been exerted to quantitatively grasp the effect of training and to heighten the quality of training. The outline of seven training courses is shown. The technical ability required for operators, the items of quantifying the effect of training, that is, operational errors and the time required for operation, the method of quantifying, the method of collecting the data and the results of the application to the actual training are described. It was found that this method is suitable to quantify the effect of training. (Kako, I.)

  18. A macroscopic cross-section model for BWR pin-by-pin core analysis

    International Nuclear Information System (INIS)

    Fujita, Tatsuya; Endo, Tomohiro; Yamamoto, Akio

    2014-01-01

    A macroscopic cross-section model used in boiling water reactor (BWR) pin-by-pin core analysis is studied. In the pin-by-pin core calculation method, pin-cell averaged cross sections are calculated for many combinations of core state and depletion history variables and are tabulated prior to core calculations. Variations of cross sections in a core simulator are caused by two different phenomena (i.e. instantaneous and history effects). We treat them through the core state variables and the exposure-averaged core state variables, respectively. Furthermore, the cross-term effect among the core state and the depletion history variables is considered. In order to confirm the calculation accuracy and discuss the treatment of the cross-term effect, the k-infinity and the pin-by-pin fission rate distributions in a single fuel assembly geometry are compared. Some cross-term effects could be negligible since the impacts of them are sufficiently small. However, the cross-term effects among the control rod history (or the void history) and other variables have large impacts; thus, the consideration of them is crucial. The present macroscopic cross-section model, which considers such dominant cross-term effects, well reproduces the reference results and can be a candidate in practical applications for BWR pin-by-pin core analysis on the normal operations. (author)

  19. Validations of BWR nuclear design code using ABWR MOX numerical benchmark problems

    International Nuclear Information System (INIS)

    Takano, Shou; Sasagawa, Masaru; Yamana, Teppei; Ikehara, Tadashi; Yanagisawa, Naoki

    2017-01-01

    BWR core design code package (the HINES assembly code and the PANACH core simulator), being used for full MOX-ABWR core design, has been benchmarked against the high-fidelity numerical solutions as references, for the purpose of validating its capability of predicting the BWR core design parameters systematically from UO 2 to 100% MOX cores. The reference solutions were created by whole core critical calculations using MCNPs with the precisely modeled ABWR cores both in hot and cold conditions at BOC and EOC of the equilibrium cycle. A Doppler-Broadening Rejection Correction (DCRB) implemented MCNP5-1.4 with ENDF/B-VII.0 was mainly used to evaluate the core design parameters, except for effective delayed neutron fraction (β eff ) and prompt neutron lifetime (l) with MCNP6.1. The discrepancies in the results between the design codes HINES-PANACH and MCNPs for the core design parameters such as the bundle powers, hot pin powers, control rod worth, boron worth, void reactivity, Doppler reactivity, β eff and l, are almost within target accuracy, leading to the conclusion that HINES-PANACH has sufficient fidelity for application to full MOX-ABWR core design. (author)

  20. Technical Basis for Peak Reactivity Burnup Credit for BWR Spent Nuclear Fuel in Storage and Transportation Systems

    Energy Technology Data Exchange (ETDEWEB)

    Marshall, William BJ J [ORNL; Ade, Brian J [ORNL; Bowman, Stephen M [ORNL; Gauld, Ian C [ORNL; Ilas, Germina [ORNL; Mertyurek, Ugur [ORNL; Radulescu, Georgeta [ORNL

    2015-01-01

    Oak Ridge National Laboratory and the United States Nuclear Regulatory Commission have initiated a multiyear project to investigate application of burnup credit for boiling-water reactor (BWR) fuel in storage and transportation casks. This project includes two phases. The first phase (1) investigates applicability of peak reactivity methods currently used in spent fuel pools (SFPs) to storage and transportation systems and (2) evaluates validation of both reactivity (keff) calculations and burnup credit nuclide concentrations within these methods. The second phase will focus on extending burnup credit beyond peak reactivity. This paper documents the first phase, including an analysis of lattice design parameters and depletion effects, as well as both validation components. Initial efforts related to extended burnup credit are discussed in a companion paper. Peak reactivity analyses have been used in criticality analyses for licensing of BWR fuel in SFPs over the last 20 years. These analyses typically combine credit for the gadolinium burnable absorber present in the fuel with a modest amount of burnup credit. Gadolinium burnable absorbers are used in BWR assemblies to control core reactivity. The burnable absorber significantly reduces assembly reactivity at beginning of life, potentially leading to significant increases in assembly reactivity for burnups less than 15–20 GWd/MTU. The reactivity of each fuel lattice is dependent on gadolinium loading. The number of gadolinium-bearing fuel pins lowers initial lattice reactivity, but it has a small impact on the burnup and reactivity of the peak. The gadolinium concentration in each pin has a small impact on initial lattice reactivity but a significant effect on the reactivity of the peak and the burnup at which the peak occurs. The importance of the lattice parameters and depletion conditions are primarily determined by their impact on the gadolinium depletion. Criticality code validation for BWR burnup

  1. LAPUR5 BWR stability analysis in Kuosheng nuclear power plant

    International Nuclear Information System (INIS)

    Kunlung Wu; Chunkuan Shih; Wang, J.R.; Kao, L.S.

    2005-01-01

    Full text of publication follows: Unstable oscillation of a nuclear power reactor core is one of the main reasons that causes minor core damage. Stability analysis needs to be performed to predict the potential problem as early as possible and to prevent core instability events from happening. Nuclear Regulatory Commission (NRC) requests all BWR licensees to examine each core reload and to impose operating limitations, as appropriate, to ensure compliance with GDC 10 and 12. GDC 10 requires that the reactor core be designed with appropriate margin to assure that specified acceptable fuel design limits will not be exceeded during any condition of normal operation, including anticipated operational occurrences. GDC 12 requires assurance that power oscillations which can result in conditions exceeding specified acceptable fuel design limits are either not possible or can be reliably and readily detected and suppressed. Therefore, the core instability is directly related to the fuel design limits. The core and channel DR (decay ratio) calculation are commonly performed to determine system's stability when new fuel designs are introduced in the core. In order to establish the independent analysis technology for BWR licensees and verifications, the Institute of Nuclear Energy Research (INER) has obtained agreement from NRC and implemented the 'Methodology and Procedure for Calculation of Core and Channel Decay Ratios with LAPUR', which was developed by the IBERINCO in 2001. LAPUR5 uses a multi-nodal description of the neutron dynamics, together with a distributed parameter model of the core thermal hydrodynamics to produce a space-dependent representation of the dynamics of a BWR in the frequency domain for small perturbations around a steady state condition. From the output of LAPUR5, the following results are obtained: global core decay ratio, out-of phase core decay ratio, and channel decay ratio. They are key parameters in the determination of BWR core stability

  2. Impact of advanced BWR core physics method on BWR core monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Moon, H; Wells, A [Siemens Power Corporation, Richland (United States)

    2000-07-01

    Siemens Power Corporation recently initiated development of POWERPLEX{sup TM}-III for delivery to the Grand Gulf Nuclear Power Station. The main change introduced in POWERPLEX{sup TM}-III as compared to its predecessor POWERPLEX{sup TM}-II is the incorporation of the advances BWR core simulator MICROBURN-B2. A number of issues were identified and evaluated relating to the implementation of MICROBURN-B2 and its impact on core monitoring. MICROBURN-B2 demands about three to five times more memory and two to three times more computing time than its predecessor MICROBURN-B in POWERPLEX {sup TM}-II. POWERPLEX{sup TM}-III will improve thermal margin prediction accuracy and provide more accurate plant operating conditions to operators than POWERPLEX{sup TM}-II due to its improved accuracy in predicted TIP values and critical k-effective. The most significant advantage of POWERPLEX{sup TM}-III is its capability to monitor a relaxed rod sequence exchange operation. (authors)

  3. Distributed control and data processing system with a centralized database for a BWR power plant

    International Nuclear Information System (INIS)

    Fujii, K.; Neda, T.; Kawamura, A.; Monta, K.; Satoh, K.

    1980-01-01

    Recent digital techniques based on changes in electronics and computer technologies have realized a very wide scale of computer application to BWR Power Plant control and instrumentation. Multifarious computers, from micro to mega, are introduced separately. And to get better control and instrumentation system performance, hierarchical computer complex system architecture has been developed. This paper addresses the hierarchical computer complex system architecture which enables more efficient introduction of computer systems to a Nuclear Power Plant. Distributed control and processing systems, which are the components of the hierarchical computer complex, are described in some detail, and the database for the hierarchical computer complex is also discussed. The hierarchical computer complex system has been developed and is now in the detailed design stage for actual power plant application. (auth)

  4. Sphere-pac versus pellet UO2 fuel in de Dodewaard BWR

    International Nuclear Information System (INIS)

    Linde, A. van der.

    1989-04-01

    Comparative testing of UO 2 sphere-pac and pellet fuel rods under LWR conditions has been jointly performed by the Netherlands Utilities Research Centre (KEMA) in Arnhem, the Netherlands Energy Research Foundation (ECN) at Petten and the Netherlands Joint Nuclear Power Utility (GKN) at Dodewaard. This final report summarizes the highlights of this 1968-1988 program with strong emphasis on the fuel rods irradiated in the Dodewaard BWR. The conclusion reached is that under normal LWR conditions sphere-pac UO 2 in LWR fuel rods offers better resistance against stress corrosion cracking of the cladding, but that under fast, single step, power ramping conditions pellet UO 2 in LWR fuel rods has a better resistance against hoop stress failure of the cladding. 128 figs., 36 refs., 19 tabs

  5. Two approaches to meeting the economic challenge for advanced BWR designs

    International Nuclear Information System (INIS)

    Rao, A.S.; Sawyer, C.D.

    1997-01-01

    This paper presents the design overview and approach to addressing the aforementioned economic challenges for two Advanced BWR designs. The first plant is the ABWR and the second is the ESBWR. The ABWR relies on proven technology and components and an extensive infrastructure that has been built up over the last 20 years. Because it has proven and standards safety systems it has very limited uncertainty regarding licensing. Finally, it relies on the economies of scale and overall design flexibility to improve the overall economics of power generation. The ESBWR on the other hand has taken an innovative approach to reduce systems and components to simplify the overall plant to improve plant economics. The overall plant design is indeed simpler, but improved economics required reliance on some economies of scale also. This design embodied in the ESBWR, also has minimized the overall development cost by utilizing features and components from the ABWR and SBWR technology programs

  6. Assessment of management alternatives for LWR wastes. Volume 3. Description of German scenarios for PWR and BWR wastes

    International Nuclear Information System (INIS)

    Santraille, S.

    1993-01-01

    This report deals with the description of a management route for PWR waste relying to a certain extent on German practices in this particular area. This description, which aims at providing input data for subsequent cost evaluation, includes all management steps which are usually implemented for solid, liquid and gaseous wastes from their production up to the interim storage of the final waste products. This study is part of an overall theoretical exercise aimed at evaluating a selection of management routes for PWR and BWR wastes based on economical and radiological criteria

  7. Application of a Barrier Filter at a High Purity Synthetic Graphite Plant, CRADA 99-F035, Final Report; FINAL

    International Nuclear Information System (INIS)

    National Energy Technology Laboratory

    2000-01-01

    Superior Graphite Company and the US Department of Energy have entered into a Cooperative Research and Development Agreement (CRADA) to study the application of ceramic barrier filters at its Hopkinsville, Kentucky graphite plant. Superior Graphite Company is a worldwide leader in the application of advanced thermal processing technology to produce high purity graphite and carbons. The objective of the CRADA is to determine the technical and economic feasibility of incorporating the use of high-temperature filters to improve the performance of the offgas treatment system. A conceptual design was developed incorporating the ceramic filters into the offgas treatment system to be used for the development of a capital cost estimate and economic feasibility assessment of this technology for improving particulate removal. This CRADA is a joint effort of Superior Graphite Company, Parsons Infrastructure and Technology Group, and the National Energy Technology Laboratory (NETL) of the US Department of Energy (DOE)

  8. Comparative analysis of mechanical characteristics of solidified concentrates from BWR system using Yugoslav and Italian cements

    International Nuclear Information System (INIS)

    Plecas, I.; Peric, A.; Drljaca, J.; Kostadinovic, A.

    1987-01-01

    In this paper, properties of Italian and Yugoslav cement mixture with BWR evaporation concentrates were compared, research was held upon fifteen samples, according to the adequate formulations. Samples were made in standard cube form, side 10 cm. Functional relationship between decreasing the compressive strength and amount of incorporated BWR concentrate cement mixture was developed. The results of research showed nearly the same mechanical properties of solidified BWR concentrate with Italian and Yugoslav cements. (author)

  9. Kinematics of two-phase mixture level motion in BWR pressure vessels

    International Nuclear Information System (INIS)

    Wulff, W.; Cheng, H.S.; Mallen, A.N.; Stritar, A.

    1985-01-01

    A model is presented for predicting two-phase mixture level elevations in BWR systems. The model accounts for the particular geometry and conditions in a BWR system during Small-Break Loss of Coolant Accidents. The model presented here is particularly suitable for efficient, high-speed simulations on small minicomputers. The model has been implemented and tested. Results are shown from BWR ATWS simulations

  10. Construction techniques and management methods for BWR plants

    International Nuclear Information System (INIS)

    Shimizu, Yohji; Tateishi, Mizuo; Hayashi, Yoshishige

    1989-01-01

    Toshiba is constantly striving for safer and more efficient plant construction to realize high-quality BWR plants within a short construction period. To achieve these aims, Toshiba has developed and improved a large number of construction techniques and construction management methods. In the area of installation, various techniques have been applied such as the modularization of piping and equipment, shop installation of reactor internals, etc. Further, installation management has been upgraded by the use of pre-installation review programs, the development of installation control systems, etc. For commissioning, improvements in commissioning management have been achieved through the use of computer systems, and testing methods have also been upgraded by the development of computer systems for the recording and analysis of test data and the automatic adjustment of controllers in the main control system of the BWR. This paper outlines these construction techniques and management methods. (author)

  11. BWR Fuel Assemblies Physics Analysis Utilizing 3D MCNP Modeling

    International Nuclear Information System (INIS)

    Chiang, Ren-Tai; Williams, John B.; Folk, Ken S.

    2008-01-01

    MCNP is used to model a partially controlled BWR fresh fuel four assemblies (2x2) system for better understanding BWR fuel behavior and for benchmarking production codes. The impact of the GE14 plenum regions on axial power distribution is observed by comparing against the GE13 axial power distribution, in which the GE14 relative power is lower than the GE13 relative power at the 15. node and at the 16. node due to presence of the plenum regions in GE14 fuel in these two nodes. The segmented rod power distribution study indicates that the azimuthally dependent power distribution is very significant for the fuel rods next to the water gap in the uncontrolled portion. (authors)

  12. BWR Fuel Assemblies Physics Analysis Utilizing 3D MCNP Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Chiang, Ren-Tai [University of Florida, Gainesville, Florida 32611 (United States); Williams, John B.; Folk, Ken S. [Southern Nuclear Company, Birmingham, Alabama 35242 (United States)

    2008-07-01

    MCNP is used to model a partially controlled BWR fresh fuel four assemblies (2x2) system for better understanding BWR fuel behavior and for benchmarking production codes. The impact of the GE14 plenum regions on axial power distribution is observed by comparing against the GE13 axial power distribution, in which the GE14 relative power is lower than the GE13 relative power at the 15. node and at the 16. node due to presence of the plenum regions in GE14 fuel in these two nodes. The segmented rod power distribution study indicates that the azimuthally dependent power distribution is very significant for the fuel rods next to the water gap in the uncontrolled portion. (authors)

  13. Initiation model for intergranular stress corrosion cracking in BWR pipes

    International Nuclear Information System (INIS)

    Hishida, Mamoru; Kawakubo, Takashi; Nakagawa, Yuji; Arii, Mitsuru.

    1981-01-01

    Discussions were made on the keys of intergranular stress corrosion cracking of austenitic stainless steel in high-temperature water in laboratories and stress corrosion cracking incidents in operating plants. Based on these discussions, a model was set up of intergranular stress corrosion cracking initiation in BWR pipes. Regarding the model, it was presumed that the intergranular stress corrosion cracking initiates during start up periods whenever heat-affected zones in welded pipes are highly sensitized and suffer dynamic strain in transient water containing dissolved oxygen. A series of BWR start up simulation tests were made by using a flowing autoclave system with slow strain rate test equipment. Validity of the model was confirmed through the test results. (author)

  14. A BWR 24-month cycle analysis using multicycle techniques

    International Nuclear Information System (INIS)

    Hartley, K.D.

    1993-01-01

    Boiling water reactor (BWR) fuel cycle design analyses have become increasingly challenging in the past several years. As utilities continue to seek improved capacity factors, reduced power generation costs, and reduced outage costs, longer cycle lengths and fuel design optimization become important considerations. Accurate multicycle analysis techniques are necessary to determine the viability of fuel designs and cycle operating strategies to meet reactor operating requirements, e.g., meet thermal and reactivity margin constraints, while minimizing overall fuel cycle costs. Siemens Power Corporation (SPC), Nuclear Division, has successfully employed multi-cycle analysis techniques with realistic rodded cycle depletions to demonstrate equilibrium fuel cycle performance in 24-month cycles. Analyses have been performed by a BWR/5 reactor, at both rated and uprated power conditions

  15. Standard Technical Specifications, General Electric plants, BWR/4

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/4, and documents the positions of the Nuclear Regulatory Commission based on the BWR Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power specifications. This report contains three volumes. This document, Volume 2, contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS

  16. Neutron noise analysis of BWR using time series analysis

    International Nuclear Information System (INIS)

    Fukunishi, Kohyu

    1976-01-01

    The main purpose of this paper is to give more quantitative understanding of noise source in neutron flux and to provide a useful tool for the detection and diagnosis of reactor. The space dependent effects of distributed neutron flux signals at the axial direction of two different strings are investigated by the power contribution ratio among neutron fluxes and the incoherent noise spectra of neutron fluxes derived from autoregressive spectra. The signals are measured on the medium sized commercial BWR of 460 MWe in Japan. From the obtained results, local and global noise sources in neutron flux are discussed. This method is indicated to be a useful tool for detection and diagnosis of anomalous phenomena in BWR. (orig./RW) [de

  17. Vertical Drop of 44-BWR Waste Package With Lifting Collars

    Energy Technology Data Exchange (ETDEWEB)

    A.K. Scheider

    2005-08-23

    The objective of this calculation is to determine the structural response of a waste package (WP) dropped flat on its bottom from a specified height. The WP used for that purpose is the 44-Boiling Water Reactor (BWR) WP. The scope of this document is limited to reporting the calculation results in terms of stress intensities. The Uncanistered Waste Disposal Container System is classified as Quality Level 1 (Ref. 4, page 7). Therefore, this calculation is subject to the requirements of the Quality Assurance Requirements and Description (Ref. 16). AP-3. 12Q, Design Calculations and Analyses (Ref. 11) is used to perform the calculation and develop the document. The information provided by the sketches attached to this calculation is that of the potential design of the type of 44-BWR WP considered in this calculation and provides the potential dimensions and materials for that design.

  18. Review of international solutions to NEACRP benchmark BWR lattice cell problems

    International Nuclear Information System (INIS)

    Halsall, M.J.

    1977-12-01

    This paper summarises international solutions to a set of BWR benchmark problems. The problems, posed as an activity sponsored by the Nuclear Energy Agency Committee on Reactor Physics, were as follows: 9-pin supercell with central burnable poison pin, mini-BWR with 4 pin-cells and water gaps and control rod cruciform, full 7 x 7 pin BWR lattice cell with differential U 235 enrichment, and full 8 x 8 pin BWR lattice cell with water-hole, Pu-loading, burnable poison, and homogenised cruciform control rod. Solutions have been contributed by Denmark, Japan, Sweden, Switzerland and the UK. (author)

  19. Evaluation of PWR and BWR pin cell benchmark results

    Energy Technology Data Exchange (ETDEWEB)

    Pilgroms, B.J.; Gruppelaar, H.; Janssen, A.J. (Netherlands Energy Research Foundation (ECN), Petten (Netherlands)); Hoogenboom, J.E.; Leege, P.F.A. de (Interuniversitair Reactor Inst., Delft (Netherlands)); Voet, J. van der (Gemeenschappelijke Kernenergiecentrale Nederland NV, Dodewaard (Netherlands)); Verhagen, F.C.M. (Keuring van Electrotechnische Materialen NV, Arnhem (Netherlands))

    1991-12-01

    Benchmark results of the Dutch PINK working group on the PWR and BWR pin cell calculational benchmark as defined by EPRI are presented and evaluated. The observed discrepancies are problem dependent: a part of the results is satisfactory, some other results require further analysis. A brief overview is given of the different code packages used in this analysis. (author). 14 refs.; 9 figs.; 30 tabs.

  20. Latest experiences in inspecting the inside of BWR vessel shields

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, R.; Gonzalez, E.

    2001-07-01

    In the last few years, the owners of BWR nuclear power plants have been forced to address new fuel shield inspection requirements, TECNATOM has responded to this situation by launching the TEIDE projects, which include development of an inspection machine and the corresponding Non-Destructive Tests to examine the inside of this shield. With these projects, TECNATOM has performed more than 12 fuel shield inspections in different countries. This article describes the experience gained in the last three years. (Author)

  1. Results of modeling advanced BWR fuel designs using CASMO-4

    International Nuclear Information System (INIS)

    Knott, D.; Edenius, M.

    1996-01-01

    Advanced BWR fuel designs from General Electric, Siemens and ABB-Atom have been analyzed using CASMO-4 and compared against fission rate distributions and control rod worths from MCNP. Included in the analysis were fuel storage rack configurations and proposed mixed oxide (MOX) designs. Results are also presented from several cycles of SIMULATE-3 core follow analysis, using nodal data generated by CASMO-4, for cycles in transition from 8x8 designs to advanced fuel designs. (author)

  2. Thermohydraulic stability coupled to the neutronic in a BWR

    International Nuclear Information System (INIS)

    Calleros M, G.; Zapata Y, M.; Gomez H, R.A.; Mendez M, A.; Castlllo D, R.

    2006-01-01

    In a BWR type reactor the phenomenon of the nuclear fission is presented, in which are liberated in stochastic form neutrons, originating that the population of the same ones varies in statistic form around a mean value. This variation will cause that when the neutron flow impacts on the neutron detectors, its are had as a result neutron flow signals with fluctuations around an average value. In this article it is shown that it conforms it lapses the time, this variations in the neutron flow (and therefore, in the flow signal due only to the fission), they presented oscillations inside a stable range, which won't be divergent. Considering that the BWR is characterized because boiling phenomena are presented, which affect the moderation of the neutrons, additional variations will be had in the signal coming from the neutron detectors, with relationship to the fission itself, which will be influenced by the feedback of the moderator's reactivity and of the temperature of the fuel pellet. Also, as the BWR it has coupled control systems to maintain the coolant level one and of the thermal power of the reactor, for each control action it was affected the neutron population. This means that the reactor could end up straying of a stable state condition. By it previously described, the study of the thermohydraulic stability coupled to the neutronic is complex. In this work it is shown the phenomenology, the mathematical models and the theoretical behavior associated to the stability of the BWR type reactor; the variables that affect it are identified, the models that reproduce the behavior of the thermohydraulic stability coupled to the neutronic, the way to maintain stable the reactor and the instrumentation that can settle to detect and to suppress uncertainties is described. In particular, is make reference to the evolution of the methods to maintain the stability of the reactor and the detection system and suppression of uncertainties implemented in the Laguna Verde

  3. TVA experience in BWR reload design and licensing

    International Nuclear Information System (INIS)

    Robertson, J.D.

    1986-01-01

    TVA has developed and implemented the capability to perform BWR reload core design and licensing analyses. The advantages accruing from this capability include the tangible cost-savings from performing reload analyses in-house. Also, ''intangible'' benefits such as increased operating flexibility and the ability to accommodate multivendor fuel designs have been demonstrated. The major disadvantage with performing in-house analyses is the cost associated with development and maintenance of the analytical methods and staff expertise

  4. Radial optimization of a BWR fuel cell using genetic algorithms

    International Nuclear Information System (INIS)

    Martin del Campo M, C.; Carmona H, R.; Oropeza C, I.P.

    2006-01-01

    The development of the application of the Genetic Algorithms (GA) to the optimization of the radial distribution of enrichment in a cell of fuel of a BWR (Boiling Water Reactor) is presented. The optimization process it was ties to the HELIOS simulator, which is a transport code of neutron simulation of fuel cells that has been validated for the calculation of nuclear banks for BWRs. With heterogeneous radial designs can improve the radial distribution of the power, for what the radial design of fuel has a strong influence in the global design of fuel recharges. The optimum radial distribution of fuel bars is looked for with different enrichments of U 235 and contents of consumable poison. For it is necessary to define the representation of the solution, the objective function and the implementation of the specific optimization process to the solution of the problem. The optimization process it was coded in 'C' language, it was automated the creation of the entrances to the simulator, the execution of the simulator and the extraction, in the exit of the simulator, of the parameters that intervene in the objective function. The objective function includes four parameters: average enrichment of the cell, average gadolinia concentration of the cell, peak factor of radial power and k-infinite multiplication factor. To be able to calculate the parameters that intervene in the objective function, the one evaluation process of GA was ties to the HELIOS code executed in a Compaq Alpha workstation. It was applied to the design of a fuel cell of 10 x 10 that it can be employee in the fuel assemble designs that are used at the moment in the Laguna Verde Nucleo electric Central. Its were considered 10 different fuel compositions which four contain gadolinia. Three heuristic rules that consist in prohibiting the placement of bars with gadolinia in the ends of the cell, to place the compositions with the smallest enrichment in the corners of the cell and to fix the placement of

  5. Maximum thermal loading test of BWR fuel assembly

    International Nuclear Information System (INIS)

    Nakajima, Yoshitaka; Yoshimura, Kunihiro; Nakamura, Satoshi; Ishizuka, Takao.

    1987-01-01

    Various proving tests on the reliability of nuclear power plants have been conducted at the Nuclear Power Engineering Test Center and at the Japan Power Plant Engineering and Inspection Corporation. The tests were initiated at the request of the Ministry of International Trade and Industry (MITI). Toshiba undertook one of the proving tests on the reliability of nuclear fuel assembly; the maximum thermal loading test of BWR fuel assembly from the Nuclear Power Engineering Test Center. These tests are part of the proving tests mentioned above, and their purpose is to confirm the reliability of the thermal hydraulic engineering techniques. Toshiba has been engaged for the past nine years in the design, fabrication and testing of the equipment. For the project, a test model fuel assembly was used to measure the critical power of the BWR fuel assembly and the void and fluidity of the coolant. From the test results, it has been confirmed that the heat is transferred safely from the fuel assembly to the coolant in the BWR nuclear power plant. In addition, the propriety and reliability of the thermal hydraulic engineering techniques for the fuel assembly have been proved. (author)

  6. The BWR vessel and internals project - 2001 and beyond

    International Nuclear Information System (INIS)

    Wagoner, V.; Mulford, T.

    2001-01-01

    The BWR Vessel and Internals Project (BWRVIP) is an international association of utilities owning boiling water reactors (BWRs). Figure 1 contains a list of current BWRVIP member utilities. The association was formed in 1994 with the following objectives: to lead the BWR industry toward generic resolution of reactor pressure vessel and internals material condition issues; to identify or develop generic, cost-effective strategies from which each operating plant will select the most appropriate alternative; to serve as the focal point for the regulatory interface with the industry on BWR vessel and internals issues; and to share information and promote communication and cooperation among participating utilities. The initial issue faced by the BWRVIP was core shroud cracking that had been observed in a number of BWRs. The BWRVIP reacted by quickly developing a set of industry guidelines to assist utilities in inspecting, evaluating, and, if necessary, repairing cracked shrouds. Subsequently, the BWRVIP pro-actively developed a comprehensive set of guidelines for managing degradation in other reactor internal components, including the reactor pressure vessel itself. The major components addressed by the BWRVIP are included. (author)

  7. The BWR vessel and internals project - 2001 and beyond

    Energy Technology Data Exchange (ETDEWEB)

    Wagoner, V. [Carolina Power and Light, Progress Energy Building, NC (United States); Mulford, T. [Electric Power Research Institute, Palo Alto, CA (United States)

    2001-07-01

    The BWR Vessel and Internals Project (BWRVIP) is an international association of utilities owning boiling water reactors (BWRs). Figure 1 contains a list of current BWRVIP member utilities. The association was formed in 1994 with the following objectives: to lead the BWR industry toward generic resolution of reactor pressure vessel and internals material condition issues; to identify or develop generic, cost-effective strategies from which each operating plant will select the most appropriate alternative; to serve as the focal point for the regulatory interface with the industry on BWR vessel and internals issues; and to share information and promote communication and cooperation among participating utilities. The initial issue faced by the BWRVIP was core shroud cracking that had been observed in a number of BWRs. The BWRVIP reacted by quickly developing a set of industry guidelines to assist utilities in inspecting, evaluating, and, if necessary, repairing cracked shrouds. Subsequently, the BWRVIP pro-actively developed a comprehensive set of guidelines for managing degradation in other reactor internal components, including the reactor pressure vessel itself. The major components addressed by the BWRVIP are included. (author)

  8. Seismic proving test of BWR primary loop recirculation system

    International Nuclear Information System (INIS)

    Sato, H.; Shigeta, M.; Karasawa, Y.

    1987-01-01

    The seismic proving test of BWR Primary Loop Recirculation system is the second test to use the large-scale, high-performance vibration table of Tadotsu Engineering Laboratory. The purpose of this test is to prove the seismic reliability of the primary loop recirculation system (PLR), one of the most important safety components in the BWR nuclear plants, and also to confirm the adequacy of seismic analysis method used in the current seismic design. To achieve the purpose, the test was conducted under conditions and scale as near as possible to actual systems. The strength proving test was carried out with the test model mounted on the vibration table in consideration of basic design earthquake ground motions and other conditions to confirm the soundness of structure and the strength against earthquakes. Detailed analysis and analytic evaluation of the data obtained from the test was conducted to confirm the adequacy of the seismic analysis method and earthquake response analysis method used in the current seismic design. Then, on the basis of the results obtained, the seismic safety and reliability of BWR primary loop recirculation of the actual plants was fully evaluated

  9. Novel modular natural circulation BWR design and safety evaluation

    International Nuclear Information System (INIS)

    Ishii, Mamoru; Shi, Shanbin; Yang, Won Sik; Wu, Zeyun; Rassame, Somboon; Liu, Yang

    2015-01-01

    Highlights: • Introduction of BWR-type natural circulation small modular reactor preliminary design (NMR-50). • Design of long fuel cycle length for the NMR-50. • Design of double passive safety systems for the NMR-50. • RELAP5 analyses of design basis accidents for the NMR-50. - Abstract: The Purdue NMR (Novel Modular Reactor) represents a BWR-type small modular reactor with a significantly reduced reactor pressure vessel (RPV) height. Specifically, it has one third the height of a conventional BWR RPV with an electrical output of 50 MWe. The preliminary design of the NMR-50 including reactor, fuel cycle, and safety systems is described and discussed. The improved neutronics design of the NMR-50 extends the fuel cycle length up to 10 years. The NMR-50 is designed with double passive engineering safety system, which is intended to withstand a prolonged station black out with loss of ultimate heat sink accident such as experienced at Fukushima. In order to evaluate the safety features of the NMR-50, two representative design basis accidents, i.e. main steam line break (MSLB) and bottom drain line break (BDLB), are simulated by using the best-estimate thermal–hydraulic code RELAP5. The RPV water inventory, containment pressure, and the performance of engineering safety systems are investigated for about 33 h after the initiation of the accidents

  10. Verification of a BWR code package by gamma scan measurements

    International Nuclear Information System (INIS)

    Nakajima, Tsuyoshi; Iwamoto, Tatsuya; Kumanomido, Hironori

    1996-01-01

    High-burnup 8 x 8 fuel with a large central water rod (called step 2 fuel) has been recently introduced to the latest Japanese boiling water reactor (BWR) plants. Lanthanum-140 gamma intensity is almost directly related to nodal powers. By gamma scan measurement, the axial distribution of 140 La in the exposed fuel was measured at the end of cycle (EOC) 1 and was compared with the calculation by a BWR code package TGBLA/LOGOS. The multienrichment fuel-type core (MEC) design was adopted for the initial cycle core of the plants. The MEC design contains three different enrichment types of fuels to simulate the equilibrium cycles, achieve much higher discharge exposure, and save fuel cycle cost, and the low-enrichment fuels are loaded in periphery and in control cells. Such MEC design could be a challenge to the BWR design methods because of the large spectrum mismatch among the fuel assemblies of the different enrichments. The aforementioned comparison has shown that the accuracy of the TGBLA/LOGOS code package is satisfactory

  11. Sensitivity of BWR shutdown margin tests to local reactivity anomalies

    International Nuclear Information System (INIS)

    Cokinos, D.M.; Carew, J.F.

    1987-01-01

    Successful shutdown margin (SDM) demonstration is a required procedure in the startup of a newly configured boiling water reactor (BWR) core. In its most reactive condition throughout a cycle, a BWR core must be capable of being made subcritical by a specified margin with the highest worth control rod fully withdrawn and all other rods at their fully inserted positions. Two different methods are used to demonstrate SDM: (a) the adjacent-rod test and (b) the in-sequence test. In the adjacent-rod test, the strongest rod is fully withdrawn and an adjacent rod is withdrawn to reach criticality. In the in-sequence test, control rods spread throughout the core are withdrawn in a predetermined sequence of withdrawals. Larger than expected core k/sub eff/ values have been observed during the performance of BWR SDM tests. The purpose of the work summarized in this paper has been to investigated and quantify the sensitivity of both the adjacent-rod and in-sequence SDM tests to local reactivity anomalies. This was accomplished by introducing reactivity perturbations at selected four-bundle cell locations and by evaluating their effect on core reactivity in each of the two tests

  12. Advanced chemistry management system to optimize BWR chemistry control

    International Nuclear Information System (INIS)

    Maeda, K.; Nagasawa, K.

    2002-01-01

    BWR plant chemistry control has close relationships among nuclear safety, component reliability, radiation field management and fuel integrity. Advanced technology is required to improve chemistry control [1,3,6,7,10,11]. Toshiba has developed TACMAN (Toshiba Advanced Chemistry Management system) to support BWR chemistry control. The TACMAN has been developed as response to utilities' years of requirements to keep plant operation safety, reliability and cost benefit. The advanced technology built into the TACMAN allows utilities to make efficient chemistry control and to keep cost benefit. TACMAN is currently being used in response to the needs for tools those plant chemists and engineers could use to optimize and identify plant chemistry conditions continuously. If an incipient condition or anomaly is detected at early stage, root causes evaluation and immediate countermeasures can be provided. Especially, the expert system brings numerous and competitive advantages not only to improve plant chemistry reliability but also to standardize and systematize know-how, empirical knowledge and technologies in BWR chemistry This paper shows detail functions of TACMAN and practical results to evaluate actual plant. (authors)

  13. Large bundle BWR test CORA-18: Test results

    International Nuclear Information System (INIS)

    Hagen, S.; Hofmann, P.; Noack, V.; Sepold, L.; Schanz, G.; Schumacher, G.

    1998-04-01

    The CORA out-of-pile experiments are part of the international Severe Fuel Damage (SFD) Program. They were performed to provide information on the damage progression of Light Water Reactor (LWR) fuel elements in Loss-of-coolant Accidents in the temperature range 1200 C to 2400 C. CORA-18 was the large BWR bundle test corresponding to the PWR test CORA-7. It should investigate if there exists an influence of the BWR bundle size on the fuel damage behaviour. Therefore, the standard-type BWR CORA bundle with 18 fuel rod simulators was replaced by a large bundle with two additional surrounding rows of 30 rods (48 rods total). Power input and steam flow were increased proportionally to the number of fuel rod simulators to give the same initial heat-up rate of about 1 K/s as in the smaller bundles. Emphasis was put on the initial phase of the damage progression. More information on the chemical composition of initial and intermediate interaction products and their relocation behaviour should be obtained. Therefore, power and steam input were terminated after the onset of the temperature escalation. (orig.) [de

  14. WASA-BOSS. Development and application of Severe Accident Codes. Evaluation and optimization of accident management measures. Subproject F. Contributions to code validation using BWR data and to evaluation and optimization of accident management measures. Final report

    International Nuclear Information System (INIS)

    Di Marcello, Valentino; Imke, Uwe; Sanchez Espinoza, Victor

    2016-09-01

    The exact knowledge of the transient course of events and of the dominating processes during a severe accident in a nuclear power station is a mandatory requirement to elaborate strategies and measures to minimize the radiological consequences of core melt. Two typical experiments using boiling water reactor assemblies were modelled and simulated with the severe accident simulation code ATHLET-CD. The experiments are related to the early phase of core degradation in a boiling water reactor. The results reproduce the thermal behavior and the hydrogen production due to oxidation inside the bundle until relocation of material by melting. During flooding of the overheated assembly temperatures and hydrogen oxidation are under estimated. The deviations from the experimental results can be explained by the missing model to simulate bore carbide oxidation of the control rods. On basis of a hypothetical loss of coolant accident in a typical German boiling water reactor the effectivity of flooding the partial degraded core is investigated. This measure of mitigation is efficient and prevents failure of the reactor pressure vessel if it starts before molten material is relocated into the lower plenum. Considerable amount of hydrogen is produced by oxidation of the metallic components.

  15. Spent fuel management strategies in eight countries and applicability to Sweden. Final report

    International Nuclear Information System (INIS)

    1986-01-01

    The spent fuel management activities described in volume 1 are compared in three areas. The first section summarizes the spent fuel management options being followed in each country and compares those options with regard to cost, environmental impact and public acceptability. Next section reviews and compares national policies on nuclear power, spent fuel management and high-level waste disposal and assesses their impact on the development and licensing of nuclear power plants. The third section compares the regulatory requirements affecting spent fuel managementin terms of their overall spirit and characteristics and in terms of the responsibilities of the utilities and the regulatory authorities. Finally, the last section addresses the applicability to Sweden of the findings from these comparisons, focusing on cost efficiency, health and safety, environmental impact, public acceptance and licensing procedures

  16. Design, construction and conditions of the application of unreinforced concrete final lining in conventionally driven tunnels

    Science.gov (United States)

    Faltýnek, Jan; Hořejší, Jiří; Mařík, Libor; Růžička, Pavel

    2017-09-01

    The way to an economic design in the final lining in conventionally driven tunnels lies in structural analysing based on the actually encountered geotechnical conditions. Regarding reinforced concrete structures, many standards and regulations applicable to designing and building structures and taking them over by the client before their commissioning and before the end of the warranty period respectively exist in the Czech Republic. If the local conditions allow it, it is possible to design the final lining as an unreinforced concrete structure. In such a case it is necessary to take the differences into consideration in the structural design and in the possibilities of the lining behaviour and to set criteria for taking over the lining allowing for its use. Setting too stringent criteria for cracking can lead to an increase in the contract price, either because of the necessity for reinforcing the lining or because of the fact that the contractor reduces the risk by incorporating the assumed cost of repairs into the total cost. The paper describes basic differences in the approach to reinforced concrete and unreinforced concrete linings, the possibilities of limiting formation of cracks by means of the concrete mix design, by selection of the technological procedure of the work and the method of curing after stripping. The text contains a comparison of criteria for assessing the surface of an unreinforced concrete lining with criteria in foreign regulations.

  17. Thermohydraulic stability coupled to the neutronic in a BWR; Estabilidad termohidraulica acoplada a la neutronica en un BWR

    Energy Technology Data Exchange (ETDEWEB)

    Calleros M, G.; Zapata Y, M.; Gomez H, R.A.; Mendez M, A. [Comision Federal de Electricidad, Central Nucleoelectrica de Laguna Verde, Carretera Cardel-Nautla Km. 42.5, Mpio. Alto Lucero, Veracruz (Mexico); Castlllo D, R. [ININ, Carretera Mexico-Toluca Km 36.5, La Marquesa, Estado de Mexico (Mexico)]. e-mail: gcm9acpp@cfe.gob.mx

    2006-07-01

    In a BWR type reactor the phenomenon of the nuclear fission is presented, in which are liberated in stochastic form neutrons, originating that the population of the same ones varies in statistic form around a mean value. This variation will cause that when the neutron flow impacts on the neutron detectors, its are had as a result neutron flow signals with fluctuations around an average value. In this article it is shown that it conforms it lapses the time, this variations in the neutron flow (and therefore, in the flow signal due only to the fission), they presented oscillations inside a stable range, which won't be divergent. Considering that the BWR is characterized because boiling phenomena are presented, which affect the moderation of the neutrons, additional variations will be had in the signal coming from the neutron detectors, with relationship to the fission itself, which will be influenced by the feedback of the moderator's reactivity and of the temperature of the fuel pellet. Also, as the BWR it has coupled control systems to maintain the coolant level one and of the thermal power of the reactor, for each control action it was affected the neutron population. This means that the reactor could end up straying of a stable state condition. By it previously described, the study of the thermohydraulic stability coupled to the neutronic is complex. In this work it is shown the phenomenology, the mathematical models and the theoretical behavior associated to the stability of the BWR type reactor; the variables that affect it are identified, the models that reproduce the behavior of the thermohydraulic stability coupled to the neutronic, the way to maintain stable the reactor and the instrumentation that can settle to detect and to suppress uncertainties is described. In particular, is make reference to the evolution of the methods to maintain the stability of the reactor and the detection system and suppression of uncertainties implemented in the

  18. Experimental study on thermo-hydraulic instability on reduced-moderation natural circulation BWR concept

    International Nuclear Information System (INIS)

    Watanabe, Noriyuki; Subki, M.H.; Kikura, Hiroshige; Aritomi, Masanori

    2003-01-01

    Reduced-moderation natural circulation BWR has been promoted to solve the recent challenges in BWR nuclear power technology problems as one of advanced small and medium-sized reactors equipped with the passive safety features in conformity with the natural law. However, the elimination of recirculation pumps and a high-density core due to the increase of conversion ratio could cause various thermo-hydraulic instabilities especially during the start-up stage. The occurrences of the thermo-hydraulic instabilities are not desirable and it is one of the main challenges in establishing reduced-moderation natural circulation BWR as a commercial reactor. The purpose of this present study is to experimentally investigate the driving mechanism of the thermo-hydraulic instabilities and the effect of system pressure on the unstable flow patterns. Hence, as the fundamental research for this study, a natural circulation loop that carries boiling fluid with parallel boiling channel has been constructed. Channel gap that has been set at 2 mm in order to simulate reduced-moderation reactor core. Pressure ranges of 0.1 up to 0.7 MPa, input heat flux range of 0 ou to 577 kW/m 2 , and inlet subcooling temperatures of 5, 10, and 15 K respectively, are imposed in the experiments. This experiment clarifies that changes in unstable flow patterns with increase in heat flux can be classified into two in response to system pressure range. In case of atmospheric pressure, unstable flow patters has been classified in beyond order, (1) in-phase geysering, (2) transition oscillation combined with both features of in-phase geysering and natural circulation oscillation, (3) natural circulation oscillation induced by hydrostatic head fluctuation, (4) density wave oscillation, and finally (5) stable boiling two-phase flow. On the other hand, in the system pressure range from 0.2 to 0.7 MPa, unstable patters have been dramatically changed in the following order (1) out-of-phase geysering, (2

  19. The corrosion potential of stainless steel in BWR environment comparison of data and modeling results

    International Nuclear Information System (INIS)

    Molander, Anders; Ullberg, Mats

    2004-01-01

    Corrosion potential measurements have been performed in Swedish BWRs during 25 years using commercially available monitoring equipment. Today, such measurements are performed on a routine basis in the BWRs on hydrogen water chemistry in Sweden. Measurements are usually performed at several monitoring locations in the plants. During the years, variations in the corrosion potential between different reactor cycles have been observed. Also, the corrosion potential can vary significantly during the reactor year. The changes have not always been easy to explain. Examples of in-plant data are given, demonstrating the need for a better understanding and for improved modeling tools. These examples were used as starting points for developing improved methods for corrosion potential modeling. A new tool recently developed, The Virtual ECP Laboratory, is described and applications to BWR conditions including some unexpected experimental corrosion potential responses are given. (author)

  20. Development of Zinc/Bromine Batteries for Load-Leveling Applications: Phase 2 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    CLARK,NANCY H.; EIDLER,PHILLIP

    1999-10-01

    This report documents Phase 2 of a project to design, develop, and test a zinc/bromine battery technology for use in utility energy storage applications. The project was co-funded by the U.S. Department of Energy Office of Power Technologies through Sandia National Laboratories. The viability of the zinc/bromine technology was demonstrated in Phase 1. In Phase 2, the technology developed during Phase 1 was scaled up to a size appropriate for the application. Batteries were increased in size from 8-cell, 1170-cm{sup 2} cell stacks (Phase 1) to 8- and then 60-cell, 2500-cm{sup 2} cell stacks in this phase. The 2500-cm{sup 2} series battery stacks were developed as the building block for large utility battery systems. Core technology research on electrolyte and separator materials and on manufacturing techniques, which began in Phase 1, continued to be investigated during Phase 2. Finally, the end product of this project was a 100-kWh prototype battery system to be installed and tested at an electric utility.

  1. Qualification of final closure for disposal container I - applicability of TIG and EBW for overpack welding

    International Nuclear Information System (INIS)

    Asano, H.; Kawahara, K.; Ishii, J.; Shige, T.

    2002-01-01

    Regarding the final sealing technique of the overpack using carbon steel, one of the candidate materials for the disposal container in the geological disposal of high-level radioactive waste in Japan, welding tests were conducted using TIG (GTAW), a typical arc welding process, and electron beam welding (EBW), a high-energy beam welding process. The purpose of the tests was to evaluate the applicability, the scope of the applications and the conditions for the application of the existing techniques; while also examining the welding conditions and the weld quality. Regarding TIG, the optimum welding conditions (the conditions pertaining to the welding procedures and the groove geometry) were checked by using a specimen with a plate thickness of 50 mm, and then circumferential welding tests were conducted for cylindrical specimens with a groove depth of 100 mm and 150 mm. Radiographic testing showed that there was no significant weld defect in the weld and that the welding characteristics were satisfactory. The results of the test of the mechanical properties of the joint were also satisfactory. Measurement of the temperature distribution and the residual stress distribution at the time of the welding was conducted for an evaluation of the residual stress caused by the welding, and an appropriate residual stress analysis method was developed, which confirmed the generation of tensile stress along the circumferential direction of the weld. Then it was pointed out that a necessity of further consideration of how to reduce the stress and to examine the influence that residual stress has on corrosion property. The goal in the EBW test was to achieve a one-pass full penetration welding process for 190 mm while conducting a partial penetration welding test for a welding depth of 80 mm. Subsequent radiographic testing confirmed that there was no significant weld defect. (orig.)

  2. K-infinite trends with burnup, enrichment, and cooling time for BWR fuel assemblies

    International Nuclear Information System (INIS)

    Broadhead, B.L.

    1998-08-01

    This report documents the work performed by ORNL for the Yucca Mountain project (YMP) M and O contractor, Framatome Cogema Fuels. The goal of this work was to obtain k inf values for infinite arrays of flooded boiling-water-reactor (BWR) fuel assemblies as a function of various burnup/enrichment and cooling-time combinations. These scenarios simulate expected limiting criticality loading conditions (for a given assembly type) for drift emplacements in a repository. Upon consultation with the YMP staff, a Quad Cities BWR fuel assembly was selected as a baseline assembly. This design consists of seven axial enrichment zones, three of which contain natural uranium oxide. No attempt was made to find a bounding or even typical assembly design due to the wide variety in fuel assembly designs necessary for consideration. The current work concentrates on establishing a baseline analysis, along with a small number of sensitivity studies which can be expected later if desired. As a result of similar studies of this nature, several effects are known to be important in the determination of the final k inf for spent fuel in a cask-like geometry. For a given enrichment there is an optimal burnup: for lower burnups, excess energy (and corresponding excess reactivity) is present in the fuel assembly; for larger burnups, the assembly is overburned and essentially driven by neighboring fuel assemblies. The majority of the burnup/enrichment scenarios included in this study were for some near-optimum burnup/enrichment combinations as determined from Energy Information Administration (EIA) data. Several calculations were performed for under- and over-burned fuel to show these effects

  3. Characteristics of debris in the lower head of a BWR in different severe accident scenarios

    International Nuclear Information System (INIS)

    Phung, Viet-Anh; Galushin, Sergey; Raub, Sebastian; Goronovski, Andrei; Villanueva, Walter; Kööp, Kaspar; Grishchenko, Dmitry; Kudinov, Pavel

    2016-01-01

    Highlights: • Station blackout scenario with delayed recovery of safety systems in a Nordic BWR is considered. • Genetic algorithm and random sampling methods are used to explore accident scenario domain. • Main groups of scenarios are identified. • Ranges and distributions of characteristics of debris bed in the lower head are determined. - Abstract: Nordic boiling water reactors (BWRs) adopt ex-vessel debris cooling to terminate severe accident progression. Core melt released from the vessel into a deep pool of water is expected to fragment and form a coolable debris bed. Characteristics of corium melt ejection from the vessel determine conditions for molten fuel–coolant interactions (FCI) and debris bed formation. Non-coolable debris bed or steam explosion can threaten containment integrity. Vessel failure and melt ejection mode are determined by the in-vessel accident progression. Characteristics (such as mass, composition, thermal properties, timing of relocation, and decay heat) of the debris bed formed in the process of core relocation into the vessel lower plenum define conditions for the debris reheating, remelting, melt-vessel structure interactions, vessel failure and melt release. Thus core degradation and relocation are important sources of uncertainty for the success of the ex-vessel accident mitigation strategy. The goal of this work is improve understanding how accident scenario parameters, such as timing of failure and recovery of different safety systems can affect characteristics of the debris in the lower plenum. Station blackout scenario with delayed power recovery in a Nordic BWR is considered using MELCOR code. The recovery timing and capacity of safety systems were varied using genetic algorithm (GA) and random sampling methods to identify two main groups of scenarios: with relatively small ( 100 tons) amount of relocated debris. The domains are separated by the transition regions, in which relatively small variations of the input

  4. Characteristics of debris in the lower head of a BWR in different severe accident scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Phung, Viet-Anh, E-mail: vaphung@kth.se; Galushin, Sergey, E-mail: galushin@kth.se; Raub, Sebastian, E-mail: raub@kth.se; Goronovski, Andrei, E-mail: andreig@kth.se; Villanueva, Walter, E-mail: walterv@kth.se; Kööp, Kaspar, E-mail: kaspar@safety.sci.kth.se; Grishchenko, Dmitry, E-mail: dmitry@safety.sci.kth.se; Kudinov, Pavel, E-mail: pavel@safety.sci.kth.se

    2016-08-15

    Highlights: • Station blackout scenario with delayed recovery of safety systems in a Nordic BWR is considered. • Genetic algorithm and random sampling methods are used to explore accident scenario domain. • Main groups of scenarios are identified. • Ranges and distributions of characteristics of debris bed in the lower head are determined. - Abstract: Nordic boiling water reactors (BWRs) adopt ex-vessel debris cooling to terminate severe accident progression. Core melt released from the vessel into a deep pool of water is expected to fragment and form a coolable debris bed. Characteristics of corium melt ejection from the vessel determine conditions for molten fuel–coolant interactions (FCI) and debris bed formation. Non-coolable debris bed or steam explosion can threaten containment integrity. Vessel failure and melt ejection mode are determined by the in-vessel accident progression. Characteristics (such as mass, composition, thermal properties, timing of relocation, and decay heat) of the debris bed formed in the process of core relocation into the vessel lower plenum define conditions for the debris reheating, remelting, melt-vessel structure interactions, vessel failure and melt release. Thus core degradation and relocation are important sources of uncertainty for the success of the ex-vessel accident mitigation strategy. The goal of this work is improve understanding how accident scenario parameters, such as timing of failure and recovery of different safety systems can affect characteristics of the debris in the lower plenum. Station blackout scenario with delayed power recovery in a Nordic BWR is considered using MELCOR code. The recovery timing and capacity of safety systems were varied using genetic algorithm (GA) and random sampling methods to identify two main groups of scenarios: with relatively small (<20 tons) and large (>100 tons) amount of relocated debris. The domains are separated by the transition regions, in which relatively small

  5. Estimation of dose rate around the spent control rods of a BWR

    International Nuclear Information System (INIS)

    Cancino P, G.

    2016-01-01

    The energy can come from fossil renewable sources (solar (natural gas, oil), wind, hydro, tidal, geothermal, biomass, bio energy and nuclear. Nuclear power can be obtained by fission reactions and fusion (still under investigation) atomic nuclei. Fission, is a partition of a very heavy nucleus (Uranium 235, for example) into two lighter nuclei. Much of the world's electric power is generated from the energy released by fission processes. In a nuclear power reactor, light water as the BWR, there are many important elements that allow safe driving operation, one of them are the elements or control systems, the burnable poison or neutron absorber inherently allow control power reactor. The control rods, which consist mostly of stainless steel and absorbing elements (such as boron carbide, hafnium, cadmium, among others) of thermal neutrons is able to initiate, regulate or stop the reactor power. These, due to the use of depleted burned or absorbing material and therefore reach their lifespan, which can be 15 years or have other values depending on the manufacturer. Control rods worn should be removed, stored or confined in expressly places. Precisely at this stage arises the importance of knowing their radiological condition to manipulate safely and without incident to the people health responsible for conducting these proceedings state arises. This thesis consists in the estimation of the dose rate in spent control rod made of boron carbide, from a typical BWR reactor. It will be estimated by direct radiation measurements with measurement equipment for radiotherapy ionization chamber, in six spent control rods, which were taken at different reactor operating cycles and are in a spent fuel pool. Using bracket electromechanical and electronic equipment for positioning and lifting equipment for radiation measurement around the control rod in the axial and radial arrangement for proper scanning. Finally will be presented a graphic corresponding to the dose

  6. Summary of the OECD/NRC Boiling Water Reactor Turbine Trip Benchmark - Fifth Workshop (BWR-TT5)

    International Nuclear Information System (INIS)

    2003-01-01

    -estimate and extreme scenarios) of the benchmark and to finalize the content and format of the Final Benchmark Comparative Analysis reports on each benchmark exercise to be published next year both as OECD/NEA and US NRC NUREG documents. Participants in the benchmark were invited to make presentations on their experience in analyzing BWR TT transients and to provide conclusions and recommendations based on the work carried out

  7. Development of CFD analysis method based on droplet tracking model for BWR fuel assemblies

    International Nuclear Information System (INIS)

    Onishi, Yoichi; Minato, Akihiko; Ichikawa, Ryoko; Mashara, Yasuhiro

    2011-01-01

    It is well known that the minimum critical power ratio (MCPR) of the boiling water reactor (BWR) fuel assembly depends on the spacer grid type. Recently, improvement of the critical power is being studied by using a spacer grid with mixing devices attaching various types of flow deflectors. In order to predict the critical power of the improved BWR fuel assembly, we have developed an analysis method based on the consideration of detailed thermal-hydraulic mechanism of annular mist flow regime in the subchannels for an arbitrary spacer type. The proposed method is based on a computational fluid dynamics (CFD) model with a droplet tracking model for analyzing the vapor-phase turbulent flow in which droplets are transported in the subchannels of the BWR fuel assembly. We adopted the general-purpose CFD software Advance/FrontFlow/red (AFFr) as the base code, which is a commercial software package created as a part of Japanese national project. AFFr employs a three-dimensional (3D) unstructured grid system for application to complex geometries. First, AFFr was applied to single-phase flows of gas in the present paper. The calculated results were compared with experiments using a round cellular spacer in one subchannel to investigate the influence of the choice of turbulence model. The analyses using the large eddy simulation (LES) and re-normalisation group (RNG) k-ε models were carried out. The results of both the LES and RNG k-ε models show that calculations of velocity distribution and velocity fluctuation distribution in the spacer downstream reproduce the experimental results qualitatively. However, the velocity distribution analyzed by the LES model is better than that by the RNG k-ε model. The velocity fluctuation near the fuel rod, which is important for droplet deposition to the rod, is also simulated well by the LES model. Then, to examine the effect of the spacer shape on the analytical result, the gas flow analyses with the RNG k-ε model were performed

  8. Generic aging management programs for license renewal of BWR reactor coolant systems components

    International Nuclear Information System (INIS)

    Shah, V.N.; Liu, Y.Y.

    2002-01-01

    The paper reviews the existing generic aging management programs (AMPs) for the reactor coolant system (RCS) components in boiling water reactors (BWRs), including the reactor pressure vessel and internals, the reactor recirculation system, and the connected piping. These programs have been evaluated in the U.S. Nuclear Regulatory Commission (NRC) report, Generic Aging Lessons Learned (GALL), NUREG-1801, for their use in the license renewal process to manage several aging effects, including loss of material, crack initiation and growth, loss of fracture toughness, loss of preload, wall thinning, and cumulative fatigue damage. The program evaluation includes a review of ten attributes (scope of program, preventive actions, parameters monitored/inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmative process, administrative control, and operating experience) for their effectiveness in managing a specific aging effect in a given component(s). The generic programs are based on the ASME Section XI inservice inspection requirements; industry guidelines for inspection and evaluation of aging effects in BWR reactor vessel, internals, and recirculation piping; monitoring and control of BWR water chemistry; and operating experience as reported in the USNRC generic communications and industry reports. The review concludes that all generic AMPs are acceptable for managing aging effects in BWR RCS components during an extended period of operation and do not need further evaluation. However, the plant-specific programs for managing aging in certain RCS components during an extended period of operation do require further evaluation. For some plant-specific AMPs, the GALL report recommends an aging management activity to verify their effectiveness. An example of such an activity is a one-time inspection of Class 1 small-bore piping to ensure that service-induced weld cracking is not occurring in the piping. Several of

  9. Generic Aging Management Programs for License Renewal of BWR Reactor Coolant System Components

    International Nuclear Information System (INIS)

    Shah, V.N.; Liu, Y.Y.

    2002-01-01

    The paper reviews the existing generic aging management programs (AMPs) for the reactor coolant system (RCS) components in boiling water reactors (BWRs), including the reactor pressure vessel and internals, the reactor recirculation system, and the connected piping. These programs have been evaluated in the U.S. Nuclear Regulatory Commission (NRC) report, Generic Aging Lessons Learned (GALL), NUREG-1801, for their use in the license renewal process to manage several aging effects, including loss of material, crack initiation and growth, loss of fracture toughness, loss of preload, wall thinning, and cumulative fatigue damage. The program evaluation includes a review of ten attributes (scope of program, preventive actions, parameters monitored/inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmative process, administrative control, and operating experience) for their effectiveness in managing a specific aging effect in a given component(s). The generic programs are based on the ASME Section XI inservice inspection requirements; industry guidelines for inspection and evaluation of aging effects in BWR reactor vessel, internals, and recirculation piping; monitoring and control of BWR water chemistry; and operating experience as reported in the USNRC generic communications and industry reports. The review concludes that all generic AMPs are acceptable for managing aging effects in BWR RCS components during an extended period of operation and do not need further evaluation. However, the plant-specific programs for managing aging in certain RCS components during an extended period of operation do require further evaluation. For some plant-specific AMPs, the GALL report recommends an aging management activity to verify their effectiveness. An example of such an activity is a one-time inspection of Class 1 small-bore piping to ensure that service-induced weld cracking is not occurring in the piping. Several of

  10. The use of the partial coherence function technique for the investigation of BWR noise dynamics

    International Nuclear Information System (INIS)

    Kostic, Lj.

    1983-01-01

    The extensive experimental investigations, at the last time, indicate that the partial coherence function technique can be a powerful method of the investigation of BWR noise dynamics. Symple BWR noise dynamics model for the global noise study, based on different noise phenomena, is proposed in this paper. (author)

  11. THALES, Thermohydraulic LOCA Analysis of BWR and PWR

    International Nuclear Information System (INIS)

    ABE, Kiyoharu

    1990-01-01

    1 - Description of program or function: THALES, which stands for 'Thermal Hydraulic Analysis of Loss-of-coolant, Emergency core cooling and Severe core damage', is a computer code system for analyzing progression of core melt accident of light water reactors. The code was developed for Level 2 PSA (probabilistic safety assessment) and applicable to a wide range of postulated accident scenarios. Its outcomes are thermal hydraulic conditions in the reactor coolant system and the containment which are necessary for analyzing fission product release and transport behavior during the accident. The code system consists of following three member codes: (1) THALES-PM for accident progression in the primary and the secondary system of PWRs, (2) THALES-BM for accident progression in the reactor coolant system of BWRs, and (3) THALES-CV for accident progression in the containment of PWRs and BWRs. The THALES-PM and the THALES-BM codes carry out two categories of analysis. The first one is overall thermal-hydraulic analysis in the reactor coolant system. The reactor coolant system is divided into multi-volumes and each volume is further separated into a liquid region and a gas region by a movable mixture level. System pressure, mixture level in each volume, coolant temperature in each region, flow rate between volumes, etc. are calculated. The other one is core heatup and meltdown analysis. The reactor core is radially and axially divided into many nodes. Fuel and cladding temperature, cladding oxidation rate, hydrogen generation rate, core melt fraction, etc. are calculated. The THALES-CV code is for containment response analysis. It divides the containment into multiple compartments, each of which is further separated into a liquid region and a gas region by a movable mixture level. Containment pressure, mixture level in each compartment, coolant temperature in each region, flow rate between compartments, etc. are calculated. The code can treat coolant blowdown from the

  12. Spent fuel management strategies in eight countries and applicability to Sweden. Final report

    International Nuclear Information System (INIS)

    1986-01-01

    International Energy Associates Limited (IEAL) undertook this study on behalf of Sweden's National Board for Spent Nuclear Fuel (SKN) from June to October 1986. The purpose of the project was to compare the programs and regulations for the management of spent fuel from nuclear power plants and disposal of high-level radioactive waste in eight countries: Belgium, Canada, the Federal Republic of Germany, France, Japan, Switzerland, the United Kingdom and the United States. This final report includes revisions requested by SKN upon review of the draft report dated in September 26, 1986. The study is presented in three volumes. Volume I (Section 2.0 of the report) consists of detailed country-specific reports on the policies, regulations and strategies for spent fuel and high-level waste management in each of the eight countries. The information contained in these country-specific reports was used as the basis for comparing the options in each country in terms of cost, environmental impact, and public acceptability, and for comparing the policies and regulatory requirements affecting these activities in each country. These comparisons are provided in Volume II (Section 3.0 of the report). Section 3.0 also includes a discussion of the applicability to Sweden of the strategies and policies in the eight countries studied. Finally, Volume III of the report (Section 4.0) presents the laws, regulations and other documents pertinent to spent fuel and high-level waste management in these countries. Descriptive summaries of the documents are provided in Section 4.0, a comparison guide to the documents themselves (the great majority of them in English) which are provided in 15 volumes of appendices

  13. Failure frequencies and probabilities applicable to BWR and PWR piping

    International Nuclear Information System (INIS)

    Bush, S.H.; Chockie, A.D.

    1996-03-01

    This report deals with failure probabilities and failure frequencies of nuclear plant piping and the failure frequencies of flanges and bellows. Piping failure probabilities are derived from Piping Reliability Analysis Including Seismic Events (PRAISE) computer code calculations based on fatigue and intergranular stress corrosion as failure mechanisms. Values for both failure probabilities and failure frequencies are cited from several sources to yield a better evaluation of the spread in mean and median values as well as the widths of the uncertainty bands. A general conclusion is that the numbers from WASH-1400 often used in PRAs are unduly conservative. Failure frequencies for both leaks and large breaks tend to be higher than would be calculated using the failure probabilities, primarily because the frequencies are based on a relatively small number of operating years. Also, failure probabilities are substantially lower because of the probability distributions used in PRAISE calculations. A general conclusion is that large LOCA probability values calculated using PRAISE will be quite small, on the order of less than 1E-8 per year (<1E-8/year). The values in this report should be recognized as having inherent limitations and should be considered as estimates and not absolute values. 24 refs 24 refs

  14. Recent development of advanced BWR technology for plant application

    International Nuclear Information System (INIS)

    Horiuchi, Tetsuo; Sakurai, Mikio; Mase, Noriaki; Oyamada, Osamu; Nakadaira, Shiro.

    1988-01-01

    The development of advanced BWRs (ABWR) was completed in 1985. Through the authorization as the third improved and standardized plants of LWRs by the Ministry of International Trade and Industry, the detailed design phase of the actual project has begun, and the improved technology to be applied to the plants has been steadily verified and put in practical use. In the ABWRs, the operational capability, safety and economical efficiency as the general characteristics of the plants were further heightened by simplifying, heightening the performance and compactifying. Particularly internal pumps brought about the improvement of the operational capability and safety of the plants together with improved control rod driving system, besides promoting the simplification and compactification of the reactor system. Also the reinforced concrete containment vessels constructed into one body with the buildings have the compact structure and the solid property sufficiently withstanding hypothetical accidents, and contribute to the improvement of the economical efficiency and safety. These key improvement technologies completed their tests for practical use, and it was shown that the expected objectives are realized with the characteristics of high level, thus the steady steps toward the construction of the actual plants are promoted. (Kako, I.)

  15. BWR noise spectra and application of noise analysis to FBR

    International Nuclear Information System (INIS)

    Nomura, T.

    1975-01-01

    Work related to noise analysis, in Tokyo Shibaura Electric Co. Ltd. (Toshiba) and Nippon Atomic Industry Group Co. Ltd. (NAIG) for the past several years is reviewed. After considering the Japan-United States Seminar on Reactor Noise Analysis in 1968, other subjects discussed were boiling water reactor noise analysis and work in relation to FBR. Parts of these are related to each other. For example, boiling detection and temperature fluctuations are problems pertinent to both fields. As the main problems in zero-power-reactor noise are now basically understood, only a brief description of the experiments involving the advanced two detector method is made. Focus is rather placed on the area of power plant noise. (author)

  16. Analysis of multi-dimensional and countercurrent effects in a BWR loss-of-coolant accident

    International Nuclear Information System (INIS)

    Shiralkar, B.S.; Dix, G.E.; Alamgir, M.

    1989-01-01

    The presence of parallel enclosed channels in a BWR provides opportunities for multiple flow regimes in co-current and countercurrent flow under Loss-of-Coolant Accident (LOCA) conditions. To address and understand these phenomena, an integrated experimental and analytical study has been conducted. The primary experimental facility was the Steam Sector Test Facility (SSTF) which simulated a full scale 30deg sector of a BWR/6 reactor vessel. Both steady-state separate effects tests and integral transients with vessel blowdown and refill were performed. The present of multi-dimensional and parallel channel effects was found to be very beneficial to BWR LOCA performance. The best estimate TRAC-BWR computer code was extended as part of this study by incorporation of a phenomenological upper plenum mixing model. TRAC-BWR was applied to the analysis of these full scale experiments. Excellent predictions of phenomena and experimental trends were achieved. (orig.)

  17. Analysis of multidimensional and countercurrent effects in a BWR loss-of-coolant accident

    International Nuclear Information System (INIS)

    Shiralkar, B.S.; Dix, G.E.; Alamgir, M.

    1991-01-01

    The presence of parallel enclosed channels in a boiling water reactor (BWR) provides opportunities for multiple flow regimes in cocurrent and countercurrent flow under loss-of-coolant accident (LOCA) conditions. To address and understand these phenomena, an integrated experimental and analytical study has been conducted. The primary experimental facility was the steam sector test facility (SSFT), which simulated a full scale 30deg sector of a BWR/6 reactor vessel. Both steady-state separate effects tests an integral transients with vessel vlowdown and refill were performed. The presence of multidimensional and parallel-channel effects was found to be very beneficial to BWR LOCA performance. The best estimate TRAC-BWR computer code was extended as part of this study by incorporation of a phenomenological upper plenum mixing model. TRAC-BWR was applied to the analysis of these full scale experiments. Excellent predictions of phenomena and experimental trends were achieved. (orig.)

  18. New innovative electrocoagulation (EC) treatment technology for BWR colloidal iron utilizing the seeding and filtration electronically (SAFETTM) system

    International Nuclear Information System (INIS)

    Denton, Mark S.; Bostick, William D.

    2007-01-01

    is 1) to break the colloid (i.e., break the outer radius repulsive charges of the similar charged colloidal particles), 2) allow these particles to now flocculate (floc), and 3) form a type of floc that is more readily filterable, and, thus, de-waterable. This task has been carried out with the innovative application of electronically seeding the feed stream with the metal of choice, and without the addition of chemicals common to ferri-flocking, or polymer addition. This patent-pending new system and technique is called Seeding And Filtration Electronically, or the SAFE TM System. Once the colloid has been broken and flocking has begun, removal of the resultant floc can be carried out by standard, back-washable (or, in simple cases, dead-end) filters; or simply in de-waterable HICs or liners. Such applications include low level radwaste (LLW) from both PWRs and BWRs, fuel pools, storage basins, salt water collection tanks, etc. For the removal of magnetic materials, such as some BWR irons, an Electro Magnetic Filter (EMF) was developed to couple with the Electro Coagulation (EC), (or metal-Flocking) Unit. In the advent that the waste stream primarily contains magnetic materials (e.g., boiler condensates and magnetite, and he-magnetite from BWRs), the material was simply filtered using the EMF. Bench-, pilot- and full-scale systems have been assembled and applied on actual plant waste samples quite successfully. The effects of initial feed pH and conductivity, as well as flocculation retention times was examined prior to applying the production equipment into the field. Since the initial studies (Denton, et al, EPRI, 2006), the ultimate success of field applications is now being demonstrated as the next development phase. For such portable field demonstrations and demand systems, a fully self enclosed (secondary containment) EC system was first developed and assembled in a modified B 25 Box (Floc-In-A-Box) and is being deployed to a number of NPP sites. Finally, a

  19. Prevention of organic iodide formation in BWR`s

    Energy Technology Data Exchange (ETDEWEB)

    Karjunen, T [Finnish Centre for Radiation and Nuclear Safety, Helsinki (Finland); Laitinen, T; Piippo, J; Sirkiae, P [VTT Manufacturing Technology (Finland)

    1996-12-01

    During an accident, many different forms of iodine may emerge. Organic iodides, such as methyl iodide and ethyl iodide, are relatively volatile, and thus their appearance leads to increased concentration of gaseous iodine. Since organic iodides are also relatively immune to most accident mitigation measures, such as sprays and filters, they can affect the accident source term significantly even when only a small portion of iodine is in organic form. Formation of organic iodides may not be limited by the amount of organic substances available. Excessive amounts of methane can be produced, for example, during oxidation of boron carbide, which is used in BWR`s as a neutron absorber material. Another important source is cable insulation. In a BWR, a large quantity of cables is placed below the pressure vessel. Thus a large quantity of pyrolyse gases will be produced, should the vessel fail. Organic iodides can be formed as a result of many different reactions, but at least in certain conditions the main reaction takes place between an organic radical produced by radiolysis and elemental iodine. A necessary requirement for prevention of organic iodide production is therefore that the pH in the containment water pools is kept high enough to eliminate formation of elemental iodine. In a typical BWR the suppression pool water is usually unbuffered. As a result, the pH may be dominated by chemicals introduced during an accident. If no system for adding basic chemicals is operable, the main factor affecting pool water pH may be hydrochloric acid released during cable degradation. Should this occur, the conditions could be very favorable for production of elemental iodine and, consequently, formation of organic iodides. Although high pH is necessary for iodine retention, it could have also adverse effects. High pH may, for example, accelerate corrosion of containment materials and alter the characteristics of the solid corrosion products. (author) 6 figs., 1 tab., 13 refs.

  20. Developing and modeling of the 'Laguna Verde' BWR CRDA benchmark

    International Nuclear Information System (INIS)

    Solis-Rodarte, J.; Fu, H.; Ivanov, K.N.; Matsui, Y.; Hotta, A.

    2002-01-01

    Reactivity initiated accidents (RIA) and design basis transients are one of the most important aspects related to nuclear power reactor safety. These events are re-evaluated whenever core alterations (modifications) are made as part of the nuclear safety analysis performed to a new design. These modifications usually include, but are not limited to, power upgrades, longer cycles, new fuel assembly and control rod designs, etc. The results obtained are compared with pre-established bounding analysis values to see if the new core design fulfills the requirements of safety constraints imposed on the design. The control rod drop accident (CRDA) is the design basis transient for the reactivity events of BWR technology. The CRDA is a very localized event depending on the control rod insertion position and the fuel assemblies surrounding the control rod falling from the core. A numerical benchmark was developed based on the CRDA RIA design basis accident to further asses the performance of coupled 3D neutron kinetics/thermal-hydraulics codes. The CRDA in a BWR is a mostly neutronic driven event. This benchmark is based on a real operating nuclear power plant - unit 1 of the Laguna Verde (LV1) nuclear power plant (NPP). The definition of the benchmark is presented briefly together with the benchmark specifications. Some of the cross-sections were modified in order to make the maximum control rod worth greater than one dollar. The transient is initiated at steady-state by dropping the control rod with maximum worth at full speed. The 'Laguna Verde' (LV1) BWR CRDA transient benchmark is calculated using two coupled codes: TRAC-BF1/NEM and TRAC-BF1/ENTREE. Neutron kinetics and thermal hydraulics models were developed for both codes. Comparison of the obtained results is presented along with some discussion of the sensitivity of results to some modeling assumptions

  1. BWR and PWR chemistry operating experience and perspectives

    International Nuclear Information System (INIS)

    Fruzzetti, K.; Garcia, S.; Lynch, N.; Reid, R.

    2014-01-01

    It is well recognized that proper control of water chemistry plays a critical role in ensuring the safe and reliable operation of Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs). State-of-the-art water chemistry programs reduce general and localized corrosion of reactor coolant system, steam cycle equipment, and fuel cladding materials; ensure continued integrity of cycle components; and reduce radiation fields. Once a particular nuclear plant component has been installed or plant system constructed, proper water chemistry provides a global tool to mitigate materials degradation problems, thereby reducing the need for costly repairs or replacements. Recognizing the importance of proper chemistry control and the value in understanding the relationship between chemistry guidance and actual operating experience, EPRI continues to collect, monitor, and evaluate operating data from BWRs and PWRs around the world. More than 900 cycles of valuable BWR and PWR operating chemistry data has been collected, including online, startup and shutdown chemistry data over more than 10 years (> 20 years for BWRs). This paper will provide an overview of current trends in BWR and PWR chemistry, focusing on plants in the U.S.. Important chemistry parameters will be highlighted and discussed in the context of the EPRI Water Chemistry Guidelines requirements (i.e., those parameters considered to be of key importance as related to the major goals identified in the EPRI Guidelines: materials integrity; fuel integrity; and minimizing plant radiation fields). Perspectives will be provided in light of recent industry initiatives and changes in the EPRI BWR and PWR Water Chemistry Guidelines. (author)

  2. Application of the final flotation waste for obtaining the glass-ceramic materials

    Directory of Open Access Journals (Sweden)

    Cocić Mira

    2017-01-01

    Full Text Available This work describes the investigation of the final flotation waste (FFW, originating from the RTB Bor Company (Serbia, as the main component for the production of glass-ceramic materials. The glass-ceramics was synthesized by the sintering of FFW, mixtures of FFW with basalt (10%, 20%, and 40%, and mixtures of FFW with tuff (20% and 40%. The sintering was conducted at the different temperatures and with the different time duration in order to find the optimal composition and conditions for crystallization. The increase of temperature, from 1100 to 1480°C, and sintering time, from 4 to 6h resulted in a higher content of hematite crystal in the obtained glass-ceramic (up to 44%. The glass-ceramics sintered from pure FFW (1080°C/36h has good mechanical properties, such as high propagation speed (4500 m/s and hardness (10800 MPa, as well as very good thermal stability. The glass-ceramics obtained from mixtures shows weaker mechanical properties compared to that obtained from pure FFW. The mixtures of FFW with tuff have a significantly lower bulk density compared to other obtained glass-ceramics. Our results indicate that FFW can be applied as a basis for obtaining the construction materials. [Project of the Serbian Ministry of Education, Science and Technological Development, Grant no. 176010: Composition, genesis, application, and contribution to the environmental sustainability

  3. Lightweight submersed 'Walking' NDE manipulators for PWR and BWR vessel weld inspection

    International Nuclear Information System (INIS)

    Saernmark, Ivan; Lenz, Herbert

    2008-01-01

    Three new manipulators developed by WesDyne TRC in Sweden have under the year 2007 performed three very successful inspections in the PWR reactor Ringhals 3 and the BWR reactors Ringhals 1 and Oskarshamn 1. The manipulator systems can be used to perform inspection of circumferential and vertical welds on the reactor pressure vessel, the core shroud, core shroud support in BWR reactors or vessel and core barrel welds in PWR reactors. Most other flat or curved surfaces can be inspected using the new concept through relatively simple mechanical reconfigurations of system modules. The first inspection was performed on the R3 PWR core barrel in June 2007 with a very good result. This Manipulator is designed for access in very narrow gaps and for the type of core barrels with a shield covering the whole area of the perimeter. The manipulator is attached to the inspection area by means of a new unique suction cup system. The current manipulators consist of a curved horizontal beam, with radius similar to the reactor vessel, and a straight vertical beam, forming a T-shaped structure. By alternating the application of suction cup pairs on the horizontal beam and the vertical beam and by driving the scanning motors, the manipulator performs an incremental translational movement upwards/downwards or from side to side. The principles of this system give a well defined and stable platform for global and local positioning accuracy. A combination of advanced sensor solutions provides accurate position information in the absence of other physical reference objects. The system is controlled by the new WesDyne TRC Motor Control Panel and software, the MCP is specifically designed for remote control of submersed manipulators using techniques for cable reduction

  4. Lightweight submersed 'Walking' NDE manipulators for PWR and BWR vessel weld inspection

    Energy Technology Data Exchange (ETDEWEB)

    Saernmark, Ivan; Lenz, Herbert [WesDyne TRC AB, Stockholm (Sweden)

    2008-04-15

    Three new manipulators developed by WesDyne TRC in Sweden have under the year 2007 performed three very successful inspections in the PWR reactor Ringhals 3 and the BWR reactors Ringhals 1 and Oskarshamn 1. The manipulator systems can be used to perform inspection of circumferential and vertical welds on the reactor pressure vessel, the core shroud, core shroud support in BWR reactors or vessel and core barrel welds in PWR reactors. Most other flat or curved surfaces can be inspected using the new concept through relatively simple mechanical reconfigurations of system modules. The first inspection was performed on the R3 PWR core barrel in June 2007 with a very good result. This Manipulator is designed for access in very narrow gaps and for the type of core barrels with a shield covering the whole area of the perimeter. The manipulator is attached to the inspection area by means of a new unique suction cup system. The current manipulators consist of a curved horizontal beam, with radius similar to the reactor vessel, and a straight vertical beam, forming a T-shaped structure. By alternating the application of suction cup pairs on the horizontal beam and the vertical beam and by driving the scanning motors, the manipulator performs an incremental translational movement upwards/downwards or from side to side. The principles of this system give a well defined and stable platform for global and local positioning accuracy. A combination of advanced sensor solutions provides accurate position information in the absence of other physical reference objects. The system is controlled by the new WesDyne TRC Motor Control Panel and software, the MCP is specifically designed for remote control of submersed manipulators using techniques for cable reduction.

  5. Evaluation of the radial design of fuel cells in an operation cycle of a BWR reactor

    International Nuclear Information System (INIS)

    Gonzalez C, J.; Martin del Campo M, C.

    2003-01-01

    This work is continuation of one previous in the one that the application of the optimization technique called Tabu search to the radial design of fuel cells of boiling water reactors (BWR, Boiling Water Reactor) is presented. The objective function used in the optimization process only include neutron parameters (k-infinite and peak of radial power) considering the cell at infinite media. It was obtained to reduce the cell average enrichment completing the characteristics of reactivity of an original cell. The objective of the present work is to validate the objective function that was used for the radial design of the fuel cell (test cell), analyzing the operation of a one cycle of the reactor in which fuels have been fresh recharged that contain an axial area with the nuclear database of the cell designed instead of the original cell. For it is simulated it with Cm-Presto the cycle 10 of the reactor operation of the Unit 1 of the Nuclear Power station of Laguna Verde (U1-CNLV). For the cycle evaluation its were applied so much the simulation with the Haling strategy, as the simulation of the one cycle with control rod patterns and they were evaluated the energy generation and several power limits and reactivity that are used as design parameters in fuel reloads of BWR reactors. The results at level of an operation cycle of the reactor, show that the objective function used in the optimization and radial design of the cell is adequate and that it can induce to one good use of the fuel. (Author)

  6. A novel technology for fouling mitigation and dose reduction in BWR

    International Nuclear Information System (INIS)

    Kim, Young-Jin; Varela, Juan

    2014-01-01

    In a boiling water reactor (BWR), a jet pump provides an internal circulation path for the core coolant flow and consists of four main sections: the nozzle section, inlet mixer section (throat barrel), flare and diffuser. A high velocity coolant flow moves through the nozzles and discharges into the inlet mixer, and over time, oxide particulates (cruds) build up on the inside 304 stainless steel (SS) surfaces of the nozzles and the inlet mixer forming a layer of crud fouling. Cruds are typically removed from the surfaces of BWR components during regularly scheduled shutdowns of the reactor that is highly costly. Thus, a cost-effective is being developed to mitigate the crud fouling and the accumulation of radioactive species by using a colloid-based process. A colloid-based process can be applied to components in service, and does not require extensive equipment and extreme processing parameters as compared to other deposition processes and is not limited by geometric constraints as is the CVD process. Several parameters, such as concentration of TiO 2 nanoparticle, deposition/post-annealing temperature, and hydrodynamic flow condition, etc., for developing the optimum TiO 2 coating process have been examined to identify the most critical condition that can be applicable at plants. Preliminary results showed that the post-annealing treatment of coating is essential for improving the adherence and coherence of colloidal TiO 2 nanoparticles to the substrate. In addition, the presence of oxide on the coating surface is detrimental to the coating durability and thus pre-existing oxide surfaces require to be cleaned before coating. (author)

  7. Artificial intelligence applied to fuel management in BWR type reactors; Inteligencia artificial aplicada a la administracion de combustible en reactores BWR

    Energy Technology Data Exchange (ETDEWEB)

    Ortiz S, J.J

    1998-10-01

    In this work two techniques of artificial intelligence, neural networks and genetic algorithms were applied to a practical problem of nuclear fuel management; the determination of the optimal fuel reload for a BWR type reactor. This is an important problem in the design of the operation cycle of the reactor. As a result of the application of these techniques, comparable or even better reloads proposals than those given by expert companies in the subject were obtained. Additionally, two other simpler problems in reactor physics were solved: the determination of the axial power profile and the prediction of the value of some variables of interest at the end of the operation cycle of the reactor. Neural networks and genetic algorithms have been applied to solve many problems of engineering because of their versatility but they have been rarely used in the area of fuel management. The results obtained in this thesis indicates the convenience of undertaking further work on this area and suggest the application of these techniques of artificial intelligence to the solution of other problems in nuclear reactor physics. (Author)

  8. Void effects on BWR Doppler and void reactivity feedback

    International Nuclear Information System (INIS)

    Hsiang-Shou Cheng; Diamond, D.J.

    1978-01-01

    The significance of steam voids and control rods on the Doppler feedback in a gadolinia shimmed BWR is demonstrated. The importance of bypass voids when determining void feedback is also shown. Calculations were done using a point model, i.e., feedback was expressed in terms of reactivity coefficients which were determined for individual four-bundle configurations and then appropriately combined to yield reactor results. For overpower transients the inclusion of the void effect of control rods is to reduce Doppler feedback. For overpressurization transients the inclusion of the effect of bypass void wil increase the reactivity due to void collapse. (author)

  9. Measurements and analysis of neutron and gamma noise in BWR's

    International Nuclear Information System (INIS)

    Dam, H. van; Kleiss, E.B.J.

    1985-01-01

    Neutron and gamma sensitive collectrons (self-powered detectors) have been designed for incore noise measurements in BWRs. A so-called twin-type has been developed for measurements of two-phase flow characteristics and detailed axial velocity distributions. Construction aspects of the twin detectors are discussed. An analysis is presented of the response of both detector types to incore parametric fluctuations. This analysis is based on detector response functions which provide an insight into the 'field of view' of the two types. The results are supported by experimental verifications; it is shown that incore gamma detectors provide useful additional information about two-phase flow in a BWR. (author)

  10. RETRAN experience with BWR transients at Yankee Atomic Electric Company

    International Nuclear Information System (INIS)

    Ansari, A.A.F.; Cronin, J.T.; Slifer, B.C.

    1981-01-01

    Yankee Atomic Electric Company is actively involved in the development of licensing methods for BWR's. The computer code chosen for analyzing system response under transient conditions is RETRAN. This paper describes the RETRAN model developed for Vermont Yankee, and the results of the RETRAN checkout and qualification that has been achieved at YAEC through comparison of RETRAN predictions to the startup test results performed at the plant as part of the 100% power startup test program. In addition, abnormal operational transients typically analyzed for licensing are also presented

  11. A study on the feasibility of minor actinides in BWR

    International Nuclear Information System (INIS)

    Abdul Waris; Budiono

    2008-01-01

    Preliminary study on the feasibility of actinides minor (MA) recycling without mixing them with plutonium in boiling water reactor (BWR) has been carried out. The results show that increasing of fissile MA content in mixed oxide fuel (MOX) and/or reducing void fraction can enlarge the effective multiplication factor at the beginning of cycle, but the reactor still can not obtain its criticality condition. Furthermore, dropping the void fraction results in higher reactivity swing and therefore plummeting the safety factor of the reactor. (author)

  12. Power ramp tests of BWR-MOX fuels

    International Nuclear Information System (INIS)

    Asahi, K.; Oguma, M.; Higuchi, S.; Kamimua, K.; Shirai, Y.; Bodart, S.; Mertens, L.

    1996-01-01

    Power ramp test of BWR-MOX and UO 2 fuel rods base irradiated up to about 60 GWd/t in Dodewaard reactor have been conducted in BR2 reactor in the framework of the international DOMO programme. The MOX pellets were provided by BN (MIMAS process) and PNC (MH method). The MOX fuel rods with Zr-liner and non-liner cladding and the UO 2 fuel rods with Zr-liner cladding remained intact during the stepwise power ramp tests to about 600 W/cm, even at about 60 GWd/t

  13. Corrosion failure of a BWR embedded reactor containment liner

    International Nuclear Information System (INIS)

    Wegemar, B.

    2006-01-01

    Following sixteen fuel cycles, leakage through a BWR embedded reactor containment liner (carbon steel) was discovered. Leakage was located at a penetration for electrical conductors as a result of penetrating corrosion attack. During construction, porous cement structures and air pockets/cavities were formed due to erroneous injection of grout. Corrosion attacks on the CS steel liner were located at the relatively small, active surfaces in contact with the porous cement structure. The corrosion mechanism was supposed to be anodic dissolution of the steel liner in areas with insufficient passivation. The penetrations were restored according to original design requirements. (author)

  14. The mechanical structure of the SVEA BWR fuel

    International Nuclear Information System (INIS)

    Nylund, O.; Johansson, A.; Junkrans, S.

    1985-01-01

    The SVEA BWR fuel assembly design is characterized by a double-wall cruciform internal structure forming an internal water gap and dividing the assembly into 4 subbundles. The effect is a favourable distribution of fuel and moderator, a minimum amount of structural material in active core, a combination of structural stability and flexibility for minimum control rod friction in reduced gaps and a reduced creep deformation of the fuel assembly. The results of a laboratory test program confirm the much lower friction force obtained with the SVEA fuel assemblies while withdrawing and inserting the control rod. (RF)

  15. In-situ testing of BWR closure head studs

    International Nuclear Information System (INIS)

    deRaad, J.A.; Wolters, J.T.

    1988-01-01

    Mechanized ultrasonic inspection of closure head studs often is on the critical path. In German BWR's, a floodcompensator is used which allows human access to the studs despite the water is up to a much higher level. For stud inspection this provides a potential solution to get out of the critical path. However, the space restrictions around the studs due to the geometry of the floodcompensator did not allow the use of the existing manipulators. This paper describes the design of a dedicated compact manipulator of a construction which copes with the restricted space available around the studs

  16. Characteristics of axial splits in failed BWR fuel rods

    International Nuclear Information System (INIS)

    Lysell, G.; Grigoriev, V.

    2000-01-01

    Secondary cladding defects in BWR fuel sometimes have the shape of long axial cracks or ''splits''. Due to the large open UO 2 surfaces exposed to the water, fission product and UO 2 release to the coolant can reach excessive levels leading to forced shut downs to remove the failed fuel rods. A number of such fuel rods have been examined in Studsvik over the last 10 years. The paper describes observations from the PIE of long cracks and discusses the driving force of the cracks. Details such as starting cracks, macroscopic and microscopic fracture surface appearance, cross sections of cracks, hydride precipitates, location and degree of plastic deformation are given. (author)

  17. Development of water chemistry diagnosis system for BWR primary loop

    International Nuclear Information System (INIS)

    Nagase, Makoto; Asakura, Yamato; Sakagami, Masaharu; Uchida, Shunsuke; Ohsumi, Katsumi.

    1988-01-01

    The prototype of a water chemistry diagnosis system for BWR primary loop has been developed. Its purposes are improvement of water chemistry control and reduction of the work burden on plant chemistry personnel. It has three main features as follows. (1) Intensifying the observation of water chemistry conditions by variable sampling intervals based on the on-line measured data. (2) Early detection of water chemistry data trends using a second order regression curve which is calculated from the measured data, and then searching the cause of anomaly if anything (3) Diagnosis of Fe concentration in feedwater using model simulations, in order to lower the radiation level in the primary system. (author)

  18. The noise analysis and the BWR operation map

    International Nuclear Information System (INIS)

    Blazquez, J.; Ballestrin, J.

    1996-01-01

    An analytical expression for the Decay Ratio is obtained: DR = exp(-bW / P 1/2 ). The physics behind is also explained. It applies to a commercial BWR Operation Map, on the vicinity of the power instability. This functional form seems fitting to the structure of the Operation map. The power P and the coolant flow are measured straightforward; the Decay Ratio is obtained by neutron noise analysis techniques. The parameter b, depending on the void reactivity coefficient, is then calculated on line during the Reactor Operation. New DR value is now predicted for each new displacement on the Map, so unexpected instability events are more likely avoided. (authors)

  19. Composition and Distribution of Tramp Uranium Contamination on BWR and PWR Fuel Rods

    International Nuclear Information System (INIS)

    Schienbein, Marcel; Zeh, Peter; Hurtado, Antonio; Rosskamp, Matthias; Mailand, Irene; Bolz, Michael

    2012-09-01

    In a joint research project of VGB and AREVA NP GmbH the behaviour of alpha nuclides in nuclear power plants with light water reactors has been investigated. Understanding the source and the behaviour of alpha nuclides is of big importance for planning radiation protection measures for outages and upcoming dismantling projects. Previous publications have shown the correlation between plant specific alpha contamination of the core and the so called 'tramp fuel' or 'tramp uranium' level which is linked to the defect history of fuel assemblies and accordingly the amount of previously washed out fuel from defective fuel rods. The methodology of tramp fuel estimation is based on fission product concentrations in reactor coolant but also needs a good knowledge of tramp fuel composition and in-core distribution on the outer surface of fuel rods itself. Sampling campaigns of CRUD deposits of irradiated fuel assemblies in different NPPs were performed. CRUD analyses including nuclide specific alpha analysis have shown systematic differences between BWR and PWR plants. Those data combined with literature results of fuel pellet investigations led to model improvements showing that a main part of fission products is caused by fission of Pu-239 an activation product of U-238. CRUD investigations also gave a better picture of the in-core composition and distribution of the tramp uranium contamination. It was shown that the tramp uranium distribution in PWR plants is time dependent. Even new fuel assemblies will be notably contaminated after only one cycle of operation. For PWR applies the following logic: the higher the local power the higher the contamination. With increasing burnup the local rod power usually decreases leading to decreasing tramp uranium contamination on the fuel rod surface. This is not applicable for tramp uranium contamination in BWR. CRUD contamination (including the tramp fuel deposits) is much more fixed and is constantly increasing

  20. FEMAXI-7 analysis on behavior of medium and high burnup BWR fuels during base-irradiation and power ramp

    Energy Technology Data Exchange (ETDEWEB)

    Ogiyanagi, Jin, E-mail: ohgiyanagi.jin@jaea.go.jp [Japan Atomic Energy Agency, 2-4 Shirane, Shirakata, Tokai-mura, Naka-gun, Ibaraki 319-1195 (Japan); Hanawa, Satoshi; Suzuki, Motoe; Nagase, Fumihisa [Japan Atomic Energy Agency, 2-4 Shirane, Shirakata, Tokai-mura, Naka-gun, Ibaraki 319-1195 (Japan)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer Two power ramp experiments of BWR fuels were analyzed by FEMAXI-7 code. Black-Right-Pointing-Pointer Calculated FGR and cladding deformation showed reasonable agreement with PIE data. Black-Right-Pointing-Pointer High temperature FGR could be predicted by the enhanced Turnbull FG diffusion constant. Black-Right-Pointing-Pointer Local PCMI model in the code could reasonably predict cladding ridging deformation. - Abstract: Irradiation behavior of medium and high burnup BWR fuels during base-irradiation and subsequent power ramp test is analyzed by a fuel performance code FEMAXI-7. The code has a 1.5-D cylindrical geometry (4 axial segments) to have a coupled solution of thermal analysis and FEM mechanical analysis. Two kinds of target fuels are selected; one was subjected to a power ramp test in the DR3 reactor at RISO after the base-irradiation in a commercial BWR, and the other was subjected to the power ramp test in the DR3 reactor after the base-irradiation in the Halden boiling water reactor. The calculated values such as fission gas release after the base-irradiation and a cladding diameter profile before and after the ramp test show a reasonable agreement with measured data. In addition, the calculated ridging deformation of the cladding before and after the ramp test, which is obtained by using a local pellet-cladding mechanical interaction (PCMI) analysis geometry in FEMAXI-7, is compared with the measured data, and it is found that the FEMAXI-7 code is applicable to the local PCMI analysis of medium and high burnup rods under normal operation and power ramp conditions.

  1. Comparison of the long-time corrosion behavior of certain Zr alloys in PWR, BWR, and laboratory tests

    International Nuclear Information System (INIS)

    Garzarolli, F.; Broy, Y.; Busch, R.A.

    1996-01-01

    Laboratory corrosion tests have always been an important tool for Zr alloy development and optimization. However, it must be known whether a test is representative for the application in-reactor. To shed more light on this question, coupons of several Zr alloys were exposed under isothermal conditions in BWR and PWR type environments. For evaluation of the in-PWR tests and for comparison of out-of-pile and in-pile tests, the different temperatures and times were normalized to a temperature-independent normalized time by assuming an activation temperature (Q/R) of 14,200 K. Comparison of in-PWR and out-of-pile corrosion behavior of Zircaloy shows that corrosion deviates to higher values in PWR if a weight gain of about 50 mg/dm 2 is exceeded. In the case of the Zr2.5Nb alloy, a slight deviation of corrosion as compared to laboratory results starts in PWR only above a weight gain of 100 mg/dm 2 . In BWR, corrosion of Zircaloy is enhanced early in time if compared with out-of-pile. Zr2.5Nb exhibits higher corrosion results in BWR than Zircaloy-4. Alloying chemistry and material condition affect corrosion of Zr alloys. However, several of the material parameters have shown a different ranking in the different environments. Nevertheless, several material parameters influencing in-reactor corrosion like the second phase particle (SPP) size of in-PWR behavior as the Sn and Fe content can be optimized by out-of-pile corrosion tests

  2. BWR power oscillation evaluation methodologies in core design

    International Nuclear Information System (INIS)

    Hotta, Akitoshi

    1995-01-01

    At the initial stage of BWR development, the power oscillation due to the nuclear-thermal interaction originated in random boiling phenomena and nuclear void feedback was feared. But it was shown that under the high pressure condition in the normal operation of recent commercial BWRs, the core is in very stable state. However, power oscillation events have been observed in actual machines, and it is necessary to do the stability evaluation that sufficiently reflects the detailed operation conditions of actual plants. As the cause of power oscillation events, the instability of control system and nuclear-thermal coupling instability are important, and their mechanisms are explained. As the model for analyzing the stability of BWR core, the nuclear-thermal coupling model in frequency domain is the central existence. As the information for the design, the parameters of fuel assemblies, and the nuclear parameters and the thermohydraulic parameters of cores are enumerated. LAPUR-TSI is a nuclear-thermal coupling model. The analysis system in the software of Tokyo Electric Power Co. is outlined, and the analysis model was verified. (K.I.)

  3. Examination of minor actinide annihilation by BWR core

    International Nuclear Information System (INIS)

    Hida, Kazuki

    1995-01-01

    From the viewpoint of reducing burden for disposing high level waste generated from spent fuel, the examination of recycling minor actinide (MA) to reactors and reducing its accumulation has been advanced. In this study, the possibility of annihilation in the case of recycling it to a BWR was examined. The main MAs are 237 Np, 241 Am, 243 Am, 242 Cm, and 244 Cm. However, as for Cm isotopes, the half life is short, the amount of generation is small, and the rate of neutron emission is high, therefore, those are disposed as waste, and 237 Np, 241 Am and 243 Am were taken as the objects of recycling. In order to grasp the basic characteristics in the case of recycling MAs to a BWR, MAs were added to UO 2 fuel, MOX fuel and HCR fuel and burned, and the nuclear conversion characteristics were examined. As the result, it was found that they were converted to short half life nuclides, and as the neutron spectra were softer, the rate of annihilation was higher. In the case of recycling MAs by concentrating to a specific reactor, reactivity loss, the degree of uranium enrichment required for compensating reactivity, and the rate of MA annihilation were calculated. Based on these data, the MA recycling system was set up, and the rate of MA annihilation was evaluated. This is reported. (K.I.)

  4. Appraisal of BWR plutonium burners for energy centers

    International Nuclear Information System (INIS)

    Williamson, H.E.

    1976-01-01

    The design of BWR cores with plutonium loadings beyond the self-generation recycle (SGR) level is investigated with regard to their possible role as plutonium burners in a nuclear energy center. Alternative plutonium burner approaches are also examined including the substitution of thorium for uranium as fertile material in the BWR and the use of a high-temperature gas reactor (HTGR) as a plutonium burner. Effects on core design, fuel cycle facility requirements, economics, and actinide residues are considered. Differences in net fissile material consumption among the various plutonium-burning systems examined were small in comparison to uncertainties in HTGR, thorium cycle, and high plutonium-loaded LWR technology. Variation in the actinide content of high-level wastes is not likely to be a significant factor in determining the feasibility of alternate systems of plutonium utilization. It was found that after 10,000 years the toxicity of actinide high-level wastes from the plutonium-burning fuel cycles was less than would have existed if the processed natural ores had not been used for nuclear fuel. The implications of plutonium burning and possible future fuel cycle options on uranium resource conservation are examined in the framework of current ERDA estimates of minable uranium resources

  5. Protecting AREVA ATRIUM™ BWR fuel from debris fretting failure

    International Nuclear Information System (INIS)

    Cole, Steven E.; Garner, Norman L.; Lippert, Hans-Joachim; Graebert, Rüdiger; Mollard, Pierre; Hahn, Gregory C.

    2014-01-01

    Historically, debris fretting has been the leading cause of fuel rod failure in BWR fuel assemblies, costing the industry millions of dollars in lost generation and negatively impacting the working area of plant site personnel. In this paper the focus will be on recent BWR fuel product innovation designed to eliminate debris related failures. Experience feedback from more than three decades of operation history with non-line-of-sight FUELGUARD™ lower tie plate debris filters will be presented. The development and relative effectiveness of successive generations of filtration technology will be discussed. It will be shown that modern, state of the art debris filters are an effective defense against debris fretting failure. Protective measures extend beyond inlet nozzle debris filters. The comprehensive debris resistance features built into AREVA’s newest fuel design, the ATRIUM™ 11, reduce the overall risk of debris entrapment as well as providing a degree of protection from debris that may fall down on the fuel assembly from above, e.g., during refueling operations. The positive recent experience in a debris sensitive plant will be discussed showing that the combination of advanced fuel technology and a robust foreign material exclusion program at the reactor site can eliminate the debris fretting failure mechanism. (author)

  6. BWROPT: A multi-cycle BWR fuel cycle optimization code

    Energy Technology Data Exchange (ETDEWEB)

    Ottinger, Keith E.; Maldonado, G. Ivan, E-mail: Ivan.Maldonado@utk.edu

    2015-09-15

    Highlights: • A multi-cycle BWR fuel cycle optimization algorithm is presented. • New fuel inventory and core loading pattern determination. • The parallel simulated annealing algorithm was used for the optimization. • Variable sampling probabilities were compared to constant sampling probabilities. - Abstract: A new computer code for performing BWR in-core and out-of-core fuel cycle optimization for multiple cycles simultaneously has been developed. Parallel simulated annealing (PSA) is used to optimize the new fuel inventory and placement of new and reload fuel for each cycle considered. Several algorithm improvements were implemented and evaluated. The most significant of these are variable sampling probabilities and sampling new fuel types from an ordered array. A heuristic control rod pattern (CRP) search algorithm was also implemented, which is useful for single CRP determinations, however, this feature requires significant computational resources and is currently not practical for use in a full multi-cycle optimization. The PSA algorithm was demonstrated to be capable of significant objective function reduction and finding candidate loading patterns without constraint violations. The use of variable sampling probabilities was shown to reduce runtime while producing better results compared to using constant sampling probabilities. Sampling new fuel types from an ordered array was shown to have a mixed effect compared to random new fuel type sampling, whereby using both random and ordered sampling produced better results but required longer runtimes.

  7. Managing the aging of BWR control rod drive systems

    International Nuclear Information System (INIS)

    Greene, R.H.; Farmer, W.S.

    1992-01-01

    This Phase I Nuclear Plant Aging Research (NPAR) study examines the aging phenomena associated with BWR control and rod drive mechanisms (CRDMs) and assesses the merits of various methods of ''imaging'' this aging. Information for this study was acquired from (1) the results of a special CRDM aging questionnaire distributed to each US BWR utility, (2) a first-of-its-kind workshop held to discuss CRDM aging and maintenance concerns, (3) an analysis of the Nuclear Plant Reliability Data System (NPRDS) failure cases attributed to the control rod drive (CRD) system, and (4) personal information exchange with nuclear industry CRDM maintenance experts. The report documenting the findings of this research, NUREG-5699, will be published this year. Nearly 23% of the NPRDS CRD system component failure reports were attributed to the CRDM. The CRDM components most often requiring replacement due to aging are the Graphitar seals. The predominant causes of aging for these seals are mechanical wear and thermal embrittlement. More than 59% of the NPRDS CRD system failure reports were attributed to components that comprise the hydraulic control unit (HCU). The predominant HCU components experiencing the effects of service wear and aging are value seals, discs, seats, stems, packing, and diaphragms

  8. Aging assessment of BWR control rod drive systems

    International Nuclear Information System (INIS)

    Greene, R.H.

    1991-01-01

    This study examines the aging phenomena associated with boiling water reactor (BWR) control rod drive mechanisms (CRDMs) and assess the merits of various methods of managing this aging. Information for this study was acquired from (1) the results of a special CRDM aging questionnaire distributed to each US BWR utility, (2) a first-of-its-kind workshop held to discuss CRDM aging and maintenance concerns, (3) an analysis of Nuclear Plant Reliability Data System (NPRDS) failure cases attributed to the CRD system, and (4) personal information exchange with industry experts. As part of this study, nearly 3500 NPRDS failure reports have been analyzed to examine the prevailing failure trends for CRD system components. An investigation was conducted to summarize the occurrence frequency of these component failures, discovery methods, reported failure causes, their respective symptoms, and actions taken by utilities to restore component and system service. The results of this research have identified the predominant CRDM failure modes and causes. In addition, recommendations are presented that identify specific actions utilities can implement to mitigate CRDM aging. An evaluation has also been made of certain maintenance practices and tooling which have enabled some utilities to reduce ALARA exposures received from routine CRDM replacement and rebuilding activities. 5 refs., 8 figs., 2 tabs

  9. Sophistication of operator training using BWR plant simulator

    International Nuclear Information System (INIS)

    Ohshiro, Nobuo; Endou, Hideaki; Fujita, Eimitsu; Miyakita, Kouji

    1986-01-01

    In Japanese nuclear power stations, owing to the improvement of fuel management, thorough maintenance and inspection, and the improvement of facilities, high capacity ratio has been attained. The thorough training of operators in nuclear power stations also contributes to it sufficiently. The BWR operator training center was established in 1971, and started the training of operators in April, 1974. As of the end of March, 1986, more than 1800 trainees completed training. At present, in the BWR operator training center, No.1 simulator of 800 MW class and No.2 simulator of 1100 MW class are operated for training. In this report, the method, by newly adopting it, good result was obtained, is described, that is, the method of introducing the feeling of being present on the spot into the place of training, and the new testing method introduced in retraining course. In the simulator training which is apt to place emphasis on a central control room, the method of stimulating trainees by playing the part of correspondence on the spot and heightening the training effect of multiple monitoring was tried, and the result was confirmed. The test of confirmation on the control board was added. (Kako, I.)

  10. Radiation buildup and control in BWR recirculation piping

    International Nuclear Information System (INIS)

    Meyer, W.; Wood, R.M.; Rao, T.V.; Vook, R.W.

    1987-01-01

    Boiling water nuclear reactors (BWRs) employ stainless steel (Types 304 or 316 NG) pipes in which high-purity water at temperatures of ∼ 275 0 C are circulated. Various components of the system, such as valves and bearings, often contain hard facing metal alloys such as Stellite-6. These components, along with the stainless steel tubing and feedwater, serve as sources of 59 Co. This cobalt, along with other soluble and insoluble impurities, is carried along with the circulating water to the reactor core where it is converted to radioactive 60 Co. After reentering the circulating water, the 60 Co can be incorporated into a complex corrosion layer in the form of CoCr 2 O 4 and/or CoFe 2 O 4 . The presence of even small amounts of 60 Co on the walls of BWR cooling systems is the dominant contributor to inplant radiation levels. Thus BWR owners and their agents are expending significant time and resources in efforts to reduce both the rate and amount of 60 Co buildup. The object of this research is twofold: (a) to form a thin diffusion barrier against the outward migration of cobalt from a cobalt-containing surface and (b) to prevent the growth of a 60 Co-containing corrosion film. The latter goal was the more important since most of the radioactive cobalt will originate from sources other than the stainless steel piping itself

  11. Aging assessment of BWR control rod drive systems

    International Nuclear Information System (INIS)

    Greene, R.H.

    1992-01-01

    This Phase 1 Nuclear Plant Aging Research (NPAR) study examines the aging phenomena associated with boiling water reactor (BWR) control rod drive mechanisms (CRDMs) and assesses the merits of various methods of managing this aging. Information for this study was acquired from (1) the results of a special CRDM aging questionnaire distributed to each US BWR utility, (2) a first-of-its-kind workshop held to discuss CRDM aging and maintenance concerns, (3) an analysis of NPRDS failure cases attributed to the CRD system, and (4) personal information exchange. As part of this study, nearly 3,500 NPRDS failure reports have been analyzed to examine the prevailing failure trends for CRD system components. An investigation has been conducted that summarizes the occurrence frequency of these component failures, discovery methods, reported failure causes, their respective symptoms, and actions taken by utilities to restore component and system service. The results of this research have identified the predominant CRDM failure modes and causes. In addition, recommendations are presented regarding specific actions that utilities can implement to mitigate CRDM aging. An evaluation has also been made of certain practices and tooling which have enabled some utilities to reduce ALARA exposures received from routine CRDM replacement and rebuilding activities

  12. Standard Technical Specifications, General Electric plants, BWR/4

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/6, and documents the positions of the Nuclear Regulatory Commission based on the BWR Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. This document Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3 contains the Bases for Sections 3.4--3.10 of the improved STS

  13. A study of heat capacity temperature limit of BWR

    International Nuclear Information System (INIS)

    Wang, Shih-Jen; Chen, Jyh-Jun; Chien, Chun-Sheng; Teng, Jyh-Tong

    2012-01-01

    Highlights: ► The purpose of this study is to verify the HCTL. ► MAAP4 was used as code to generate a realistic and convenient HCTL. ► The current HCTL curve causes confusing in reading data. ► The revised HCTL curves developed in this study. ► Users can obtain important parameters from the revised HCTL without confusion and interpolation. - Abstract: Heat capacity temperature limit (HCTL) is an important parameter for operation of BWR. Current version of the HCTL was derived, based on simple model of computation aids (CA) of BWR owners’ group (BWROG). However, some parts of the current HCTL are confusing to the users in reading data. The purpose of this study is to verify the HCTL by applying the MAAP4 code to the field of emergency operating procedure (EOP). The trends of HCTL generated by MAAP4 code are consistent with those obtained from CA. A series of revised HCTL evaluated at various times after scram are provided and the confusing part is eliminated.

  14. Standard Technical Specifications, General Electric Plants, BWR/6

    International Nuclear Information System (INIS)

    1992-09-01

    This NUREG contains improved Standard Technical Specifications (STS) for General Electric Plants, BWR/4, and documents the positions of the Nuclear Regulatory Commission based on the BWR Owners Group's proposed STS. This document is the result of extensive technical meetings and discussions among the NRC staff, the Nuclear Steam Supply System (NSSS) Owners Groups, the NSSS vendors, and the Nuclear Management and Resources Council (NUMARC). The improved STS were developed based on the criteria in the interim Commission Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated February 6, 1987. The improved STS will be used as the basis for individual nuclear power plant licensees to develop improved plant-specific technical specifications. This report contains three volumes. Volume 1 contains the Specifications for all chapters and sections of the improved STS. Volume 2 contains the Bases for Chapters 2.0 and 3.0, and Sections 3.1--3.3 of the improved STS. Volume 3, contains the Bases for Sections 3.4--3.10 of the improved STS

  15. System control model of a turbine for a BWR

    International Nuclear Information System (INIS)

    Vargas O, Y.; Amador G, R.; Ortiz V, J.; Castillo D, R.; Delfin L, A.

    2009-10-01

    In this work is presented a design of a control system of a turbine for a nuclear power plant with a BWR like energy source. The model seeks to implement later on at thermal hydraulics code of better estimate RELAP/SCDAPSIM. The model is developed for control and protection of turbine, and the consequent protection to the BWR, considering that the turbine control could be employed for one or several turbines in series. The quality of present designs of control pattern of turbine it is that it considers the parameters more important in the operation of a turbine besides that is has incorporated at control the secondary parameters that will be activated originally as true when the turbine model is substituted by a model more detailed. The development of control model of a turbine will be good in short and medium term to realize analysis about the operation of turbine with different operation conditions, of vapor extraction specific steps of turbine to feed other equipment s, besides analyzing the separate effect and integrated effect. (Author)

  16. Evaluation of thermal margin during BWR neutron flux oscillation

    International Nuclear Information System (INIS)

    Takeuchi, Yutaka; Takigawa, Yukio; Chuman, Kazuto; Ebata, Shigeo

    1992-01-01

    Fuel integrity is very important, from the view point of nuclear power plant safety. Recently, neutron flux oscillations were observed at several BWR plants. The present paper describes the evaluations of the thermal margin during BWR neutron flux oscillations, using a three-dimensional transient code. The thermal margin is evaluated as MCPR (minimum critical power ratio). The LaSalle-2 event was simulated and the MCPR during the event was evaluated. It was a core-wide oscillation, at which a large neutron flux oscillation amplitude was observed. The results indicate that the MCPR had a sufficient margin with regard to the design limit. A regional oscillation mode, which is different from a core-wide oscillation, was simulated and the MCPR response was compared with that for the LaSalle-2 event. The MCPR decrement is greater in the regional oscillation, than in the core wide -oscillation, because of the sensitivity difference in a flow-to-power gain. A study was carried out about regional oscillation detectability, from the MCPR response view point. Even in a hypothetically severe case, the regional oscillation is detectable by LPRM signals. (author)

  17. Safety evaluation of BWR off-gas treatment systems

    International Nuclear Information System (INIS)

    Schultz, R.J.; Schmitt, R.C.

    1975-01-01

    Some of the results of a safety evaluation performed on current generic types of BWR off-gas treatment systems including cooled and ambient temperature adsorber beds and cryogenics are presented. The evaluation covered the four generic types of off-gas systems and the systems of five major vendors. This study was part of original work performed under AEC contract for the Directorate of Regulatory Standards. The analysis techniques employed for the safety evaluation of these systems include: Fault Tree Analysis; FMECA (Failure Mode Effects and Criticality Analysis); general system comparisons, contaminant, system control, and design adequacy evaluations; and resultant Off-Site Dose Calculations. The salient areas presented are some of the potential problem areas, the approach that industry has taken to mitigate or design against potential upset conditions, and areas where possible deficiencies still exist. Potential problem areas discussed include hydrogen detonation, hydrogen release to equipment areas, operator/automatic control interface, and needed engineering evaluation to insure safe system operation. Of the systems reviewed, most were in the category of advanced or improved over that commonly in use today, and a conclusion from the study was that these systems offer excellent potential for noble gas control for BWR power plants where more stringent controls may be specified -- now or in the future. (U.S.)

  18. Aging assessment of BWR control rod drive systems

    International Nuclear Information System (INIS)

    Greene, R.H.

    1991-01-01

    This Phase 1 Nuclear Plant Aging Research (NPAR) study examines the aging phenomena associated with boiling water reactor (BWR) control rod drive mechanisms (CRDMs) and assesses the merits of various methods of managing this aging. Information for this study was acquired from (1) the results of a special CRDM aging questionnaire distributed to each US BWR utility, (2) a first-of-its-kind workshop held to discuss CRDM aging and maintenance concerns, (3) an analysis of NPRDS failure cases attributed to the CRD system, and (4) personal information exchange. As part of this study, nearly 3,500 NPRDS failure reports have been analyzed to examine the prevailing failure trends for CRD system components. An investigation has been conducted that summarizes the occurrence frequency of these component failures, discovery methods, reported failure causes, their respective symptoms, and actions taken by utilities to restore component and system service. The results of this research have identified the predominant CRDM failure modes and causes. In addition, recommendations are presented regarding specific actions that utilities can implement to mitigate CRDM aging. An evaluation has also been made of certain practices and tooling which have enabled some utilities to reduce ALARA exposures received from routine CRDM replacement and rebuilding activities

  19. An optimized BWR fuel lattice for improved fuel utilization

    International Nuclear Information System (INIS)

    Bernander, O.; Helmersson, S.; Schoen, C.G.

    1984-01-01

    Optimization of the BWR fuel lattice has evolved into the water cross concept, termed ''SVEA'', whereby the improved moderation within bundles augments reactivity and thus improves fuel cycle economy. The novel design introduces into the assembly a cruciform and double-walled partition containing nonboiling water, thus forming four subchannels, each of which holds a 4x4 fuel rod bundle. In Scandinavian BWRs - for which commercial SVEA reloads are now scheduled - the reactivity gain is well exploited without adverse impact in other respects. In effect, the water cross design improves both mechanical and thermal-hydraulic performance. Increased average burnup is also promoted through achieving flatter local power distributions. The fuel utilization savings are in the order of 10%, depending on the basis of comparison, e.g. choice of discharge burnup and lattice type. This paper reviews the design considerations and the fuel utilization benefits of the water cross fuel for non-Scandinavian BWRs which have somewhat different core design parameters relative to ASEA-ATOM reactors. For one design proposal, comparisons are made with current standard 8x8 fuel rod bundles as well as with 9x9 type fuel in reactors with symmetric or asymmetric inter-assembly water gaps. The effect on reactivity coefficients and shutdown margin are estimated and an assessment is made of thermal-hydraulic properties. Consideration is also given to a novel and advantageous way of including mixed-oxide fuel in BWR reloads. (author)

  20. A study of heat capacity temperature limit of BWR

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Shih-Jen, E-mail: sjenwang@iner.gov.tw [Institute of Nuclear Energy Research (INER), 1000, Wunhua Rd., Jiaan Village, Longtan Township, Taoyuan County 32546, Taiwan (China); Chen, Jyh-Jun [Department of Mechanical Engineering, Chung Yuan Christian University, 200, Chung Pei Rd., Chung Li City, Taoyuan County 32023, Taiwan (China); Chien, Chun-Sheng [Institute of Nuclear Energy Research (INER), 1000, Wunhua Rd., Jiaan Village, Longtan Township, Taoyuan County 32546, Taiwan (China); Teng, Jyh-Tong [Department of Mechanical Engineering, Chung Yuan Christian University, 200, Chung Pei Rd., Chung Li City, Taoyuan County 32023, Taiwan (China)

    2012-02-15

    Highlights: Black-Right-Pointing-Pointer The purpose of this study is to verify the HCTL. Black-Right-Pointing-Pointer MAAP4 was used as code to generate a realistic and convenient HCTL. Black-Right-Pointing-Pointer The current HCTL curve causes confusing in reading data. Black-Right-Pointing-Pointer The revised HCTL curves developed in this study. Black-Right-Pointing-Pointer Users can obtain important parameters from the revised HCTL without confusion and interpolation. - Abstract: Heat capacity temperature limit (HCTL) is an important parameter for operation of BWR. Current version of the HCTL was derived, based on simple model of computation aids (CA) of BWR owners' group (BWROG). However, some parts of the current HCTL are confusing to the users in reading data. The purpose of this study is to verify the HCTL by applying the MAAP4 code to the field of emergency operating procedure (EOP). The trends of HCTL generated by MAAP4 code are consistent with those obtained from CA. A series of revised HCTL evaluated at various times after scram are provided and the confusing part is eliminated.

  1. Damage by radiation in structural materials of BWR reactor vessels

    International Nuclear Information System (INIS)

    Robles, E.; Balcazar, M.; Alpizar, A.M.; Calderon, B.E.

    2002-01-01

    The structural materials which are manufactured the pressure vessels of the BWR reactors undergo degradation in their mechanical properties mainly due to the damage produced by the fast neutrons (E> 1 MeV) coming from the reactor core. The mechanisms of neutron damage in this type of materials are experimentally studied, through the irradiation of vessel steel in experimental reactors for a quickly ageing. Alternately the neutron damage through steel irradiation with heavy ions is simulated. In this work the first results of the damage induced by irradiation of a similar steel to the vessel of a BWR reactor are shown. The irradiation was performed with fast neutrons (E> 1 MeV, fluence of 1.45 x 10 18 n/cm 2 ) in the TRIGA Mark III Salazar reactor and separately with Ni +3 ions in a Tandetrom accelerator (E= 4.8 MeV and an ion flux rank of 0.1 to 53 ions/A 2 ). (Author)

  2. Studies of fragileness in steels of vessels of BWR reactors

    International Nuclear Information System (INIS)

    Robles, E.F.; Balcazar, M.; Alpizar, A.M.; Calderon, B.E.

    2003-01-01

    The structural materials with those that are manufactured the pressure vessels of the BWR reactors, suffer degradation in its mechanical properties mainly to the damage taken place by the fast neutrons (E > 1 MeV) coming from the reactor core. Its are experimentally studied those mechanisms of neutron damage in this material type, by means of the irradiation of steel vessel in experimental reactors to age them quickly. Alternatively it is simulated the neutron damage by means of irradiation of steel with heavy ions. In this work those are shown first results of the damage induced by irradiation from a similar steel to the vessel of a BWR reactor. The irradiation was carried out with fast neutrons (E > 1 MeV, fluence of 1.45 x 10 18 n/cm 2 ) in the TRIGA MARK lll reactor and separately with Ni +3 ions in a Tandetrom accelerator, E = 4.8 MeV and range of the ionic flow of 0.1 to 53 iones/A 2 . (Author)

  3. Operational experiences with on line BWR condenser tube leak verification

    International Nuclear Information System (INIS)

    Bryant, R.A.; Duvall, W.E.; Kirkley, W.B.; Zavadoski, R.W.

    1988-01-01

    Verifying condenser tube leaks at a boiling water reactor is, at best, a difficult task carried out in hot steamy water boxes with concurrent radiation exposure. For small apparent leaks with slight chemical changes there is always uncertainty of whether the problem is a condenser tube leak or a feedback from radwaste. Most conventional methods (e.g soap tests, Saran wrap suction, and helium tests) usually involve a load reduction to isolate the water boxes one at a time and hours of drain down on each box. The sensitivity of the most sensitive test (helium) is of the order of 7500 l per day per box. Sulfur hexafluoride has been successfully used at a BWR to identify one leaking water box out of four while the unit was at 100 % power. The actual tubes leakig in the water box were identified by injecting helium during drain down of the box and subsequent manifold testing. Additional tests with sulfur hexafluoride on the second BWR unit indicated tight water boxes to within the sensitivity of the measurement, i.e. less than 19 l per day for all four boxes. Problems encountered in both tests included sulfur hexafluoride carry over from the plume of the cooling towers and off gas considerations. In brief sulfur hexafluoride can be used to quickly identify which particular water box has a condenser tube leak or, just as quickly, establish the integrity of all the water boxes to a level not previously attainable. (author)

  4. Logical model for the control of a BWR turbine

    International Nuclear Information System (INIS)

    Vargas O, Y.; Amador G, R.; Ortiz V, J.; Castillo D, R.

    2009-01-01

    In this work a design of a logical model is presented for the turbine control of a nuclear power plant with a BWR like energy source. The model is sought to implement later on inside the thermal hydraulics code of better estimate RELAP/SCDAPSIM. The logical model is developed for the control and protection of the turbine, and the consequent protection to the BWR, considering that the turbine control will be been able to use for one or several turbines in series. The quality of the present design of the logical model of the turbine control is that it considers the most important parameters in the operation of a turbine, besides that they have incorporated to the logical model the secondary parameters that will be activated originally as true when the turbine model is substituted by a detailed model. The development of the logical model of a turbine will be of utility in the short and medium term to carry out analysis on the turbine operation with different operation conditions, of vapor extraction, specific steps of the turbine to feed other equipment s, in addition to analyze the separate and the integrated effect. (Author)

  5. Automatic determination of BWR fuel loading patterns based on K.E. technique with core physics simulation

    International Nuclear Information System (INIS)

    Ikehara, T.; Tsuiki, M.; Takeshita, T.

    1990-01-01

    On the basis oof a computerized search method, a prototype for a fuel loading pattern expert system has been developed to support designers in core design for BWRs. The method was implemented by coupling rules and core physics simulators into an inference engine to establish an automated generate-and-test cycle. A search control mechanism, which prunes paths to be searched and selects appropriate rules through the interaction with the user, was also introduced to accomplish an effective search. The constraints in BWR core design are: (1) cycle length more than L, (2) core shutdown margin more than S, and (3) thermal margin more than T. Here L, S, and T are the specified minimum values. In this system, individual rules contain the manipulation to improve the core shutdown margin explicitly. Other items were taken into account only implicitly. Several applications to the test cases were carried out. It was found that the results were comparable with those obtained by human expert engineers. Broad applicability of the present method in the BWR core design domain was proved

  6. Safety analysis of thorium-based fuels in the General Electric Standard BWR

    International Nuclear Information System (INIS)

    Colby, M.J.; Townsend, D.B.; Kunz, C.L.

    1980-06-01

    A denatured (U-233/Th)O 2 fuel assembly has been designed which is energy equivalent to and hardware interchangeable with a modern boiling water reactor (BWR) reference reload assembly. Relative to the reference UO 2 fuel, the thorium fuel design shows better performance during normal and transient reactor operation for the BWR/6 product line and will meet or exceed current safety and licensing criteria. Power distributions are flattened and thermal operating margins are increased by reduced steam void reactivity coefficients caused by U-233. However, a (U-233/Th)O 2 -fueled BWR will likely have reduced operating flexibility. A (U-235/Th)O 2 -fueled BWR should perform similar to a UO 2 -fueled BWR under all operating conditions. A (Pu/Th)O 2 -fueled BWR may have reduced thermal margins and similar accident response and be less stable than a UO 2 -fueled BWR. The assessment is based on comparisions of point model and infinite lattice predictions of various nuclear reactivity parameters, including void reactivity coefficients, Doppler reactivity coefficients, and control blade worths

  7. An assessment of BWR [boiling water reactor] Mark-II containment challenges, failure modes, and potential improvements in performance

    International Nuclear Information System (INIS)

    Kelly, D.L.; Jones, K.R.; Dallman, R.J.; Wagner, K.C.

    1990-07-01

    This report assesses challenges to BWR Mark II containment integrity that could potentially arise from severe accidents. Also assessed are some potential improvements that could prevent core damage or containment failure, or could mitigate the consequences of such failure by reducing the release of fission products to the environment. These challenges and improvements are analyzed via a limited quantitative risk/benefit analysis of a generic BWR/4 reactor with Mark II containment. Point estimate frequencies of the dominant core damage sequences are obtained and simple containment event trees are constructed to evaluate the response of the containment to these severe accident sequences. The resulting containment release modes are then binned into source term release categories, which provide inputs to the consequence analysis. The output of the consequences analysis is used to construct an overall base case risk profile. Potential improvements and sensitivities are evaluated by modifying the event tree spilt fractions, thus generating a revised risk profile. Several important sensitivity cases are examined to evaluate the impact of phenomenological uncertainties on the final results. 75 refs., 25 figs., 65 tabs

  8. Experimental study on breakup and fragmentation behavior of molten material jet in complicated structure of BWR lower plenum

    International Nuclear Information System (INIS)

    Saito, Ryusuke; Abe, Yutaka; Yoshida, Hiroyuki

    2014-01-01

    To estimate the state of reactor pressure vessel of Fukushima Daiichi nuclear power plant, it is important to clarify the breakup and fragmentation of molten material jet in the lower plenum of boiling water reactor (BWR) by a numerical simulation. To clarify the effects of complicated structures on the jet behavior experimentally and validate the simulation code, we conduct the visualized experiments simulating the severe accident in the BWR lower plenum. In this study, jet breakup, fragmentation and surrounding velocity profiles of the jet were observed by the backlight method and the particle image velocimetry (PIV) method. From experimental results using the backlight method, it was clarified that jet tip velocity depends on the conditions whether complicated structures exist or not and also clarified that the structures prevent the core of the jet from expanding. From measurements by the PIV method, the surrounding velocity profiles of the jet in the complicated structures were relatively larger than the condition without structure. Finally, fragment diameters measured in the present study well agree with the theory suggested by Kataoka and Ishii by changing the coefficient term. Thus, it was suggested that the fragmentation mechanism was mainly controlled by shearing stress. (author)

  9. 78 FR 20317 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-04-04

    ... supplying information that competitors could use to compete with companies in the United States. DATES... or Financial Guarantee in Excess of $100 Million: AP087223XX and AP087223XA AGENCY: Export-Import...''), that Ex-Im Bank has received an application for final commitment for a long-term loan or financial...

  10. 77 FR 47382 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2012-08-08

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice 2012-0345] Application for Final Commitment...: Export-Import Bank of the U.S. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  11. 78 FR 21948 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-04-12

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0027] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  12. 78 FR 16852 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-03-19

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0024] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  13. 78 FR 39285 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-07-01

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0033] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  14. 78 FR 78955 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-12-27

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0060] Application for Final... AP088412XB AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United...

  15. 78 FR 59688 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-09-27

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0049] Application for Final... AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States...

  16. 78 FR 56227 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-09-12

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0045] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  17. 77 FR 74010 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2012-12-12

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2012-0546] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  18. 78 FR 1211 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-01-08

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice 2012-0558] Application for Final Commitment...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  19. 78 FR 23763 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-04-22

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0028] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  20. 78 FR 76614 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-12-18

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0059] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  1. 78 FR 16675 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-03-18

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0023] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  2. 78 FR 2673 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-01-14

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0102] Application for Final... AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States...

  3. 78 FR 42072 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-07-15

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0034] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...

  4. 78 FR 2672 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-01-14

    ... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0101] Application for Final..., AP078595XB AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United...

  5. 78 FR 67144 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-11-08

    ... EXPORT-IMPORT BANK [Public Notice 2013-0050] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP086418XX AGENCY: Export-Import Bank of the United...) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank''), that Ex-Im Bank has...

  6. 78 FR 69850 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-11-21

    ..., rail and port facilities in Australia. To the extent that Ex-Im Bank is reasonably aware, the item(s... EXPORT-IMPORT BANK [Public Notice: 2013-0054] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP086750XX AGENCY: Export-Import Bank of the...

  7. 78 FR 33090 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-06-03

    ...-haul passenger service from Australia to other countries. To the extent that Ex-Im Bank is reasonably... EXPORT-IMPORT BANK [Public Notice 2013-0030] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP087980XX AGENCY: Export-Import Bank of the United...

  8. 77 FR 70161 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2012-11-23

    ... the transaction: To support the export of U.S. manufactured aircraft under operating lease from the... China. To the extent that Ex-Im Bank is reasonably aware, the item(s) being exported are not expected to... EXPORT-IMPORT BANK [Public Notice 2012-0543] Application for Final Commitment for a Long-Term Loan...

  9. 78 FR 20913 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-04-08

    ... the transaction: To support the export of U.S. manufactured commercial aircraft to China. Brief non... EXPORT-IMPORT BANK [Public Notice 2013-0024] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 million: AP087801XX AGENCY: Export-Import Bank of the United...

  10. 77 FR 61750 - Application for Final Commitment for a Long-term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2012-10-11

    ... export of a U.S.-manufactured satellite and associated services to China (Hong Kong). Brief non-proprietary description of the anticipated use of the items being exported: The U.S. exports will be used to... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice 2012-0528] Application for Final Commitment...

  11. 78 FR 13666 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Science.gov (United States)

    2013-02-28

    ... Telecommunications Company Limited. Guarantor(s): N/A. Description of Items Being Exported: To finance the... EXPORT-IMPORT BANK [Public Notice 2013-0015] Application for Final Commitment for a Long-Term Loan... States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10...

  12. Optimization of fuel cells for BWR based in Tabu modified search; Optimizacion de celdas de combustible para BWR basada en busqueda Tabu modificada

    Energy Technology Data Exchange (ETDEWEB)

    Martin del Campo M, C.; Francois L, J.L. [Facultad de Ingenieria, UNAM, Laboratorio de Analisis en Ingenieria de Reactores Nucleares, Paseo Cuauhnahuac 8532, 62550 Jiutepec, Morelos (Mexico); Palomera P, M.A. [Facultad de Ingenieria, UNAM, Posgrado en Ingenieria en Computacion, Circuito exterior s/n, Ciudad Universitaria, Mexico, D.F. (Mexico)]. e-mail: cmcm@fi-b.unam.mx

    2004-07-01

    The advances in the development of a computational system for the design and optimization of cells for assemble of fuel of Boiling Water Reactors (BWR) are presented. The method of optimization is based on the technique of Tabu Search (Tabu Search, TS) implemented in progressive stages designed to accelerate the search and to reduce the time used in the process of optimization. It was programed an algorithm to create the first solution. Also for to diversify the generation of random numbers, required by the technical TS, it was used the Makoto Matsumoto function obtaining excellent results. The objective function has been coded in such a way that can adapt to optimize different parameters like they can be the enrichment average or the peak factor of radial power. The neutronic evaluation of the cells is carried out in a fine way by means of the HELIOS simulator. In the work the main characteristics of the system are described and an application example is presented to the design of a cell of 10x10 bars of fuel with 10 different enrichment compositions and gadolinium content. (Author)

  13. SUN-RAH: a nucleoelectric BWR university simulator based in reduced order models; SUN-RAH: simulador universitario de nucleoelectrica BWR basado en modelos de orden reducido

    Energy Technology Data Exchange (ETDEWEB)

    Morales S, J.B.; Lopez R, A.; Sanchez B, A.; Sanchez S, R.; Hernandez S, A. [DEPFI, Campus Morelos, en IMTA Jiutepec, Morelos (Mexico)]. e-mail: jms0620@yahoo.com

    2003-07-01

    The development of a simulator that allows to represent the dynamics of a nucleo electric central, with nuclear reactor of the BWR type, using reduced order models is presented. These models present the characteristics defined by the dominant poles of the system (1) and most of those premature operation transitories in a power station can be reproduced with considerable fidelity if the models are identified with data of plant or references of a code of better estimate like RAMONA, TRAC (2) or RELAP. The models of the simulator are developments or own simplifications starting from the physical laws and retaining the main terms. This work describes the objective of the project and the general specifications of the University student of Nucleo electric simulator with Boiling Water Reactor type (SUN-RAH) as well as the finished parts that fundamentally are the nuclear reactor, the one of steam supply (NSSS), the plant balance (BOP), the main controllers of the plant and the implemented graphic interfaces. The pendent goals as well as the future developments and applications of SUN-RAH are described. (Author)

  14. Final Report for Project "Framework Application for Core-Edge Transport Simulations (FACETS)"

    Energy Technology Data Exchange (ETDEWEB)

    Estep, Donald [Colorado State Univ., Fort Collins, CO (United States)

    2014-01-17

    This is the final report for the Colorado State University Component of the FACETS Project. FACETS was focused on the development of a multiphysics, parallel framework application that could provide the capability to enable whole-device fusion reactor modeling and, in the process, the development of the modeling infrastructure and computational understanding needed for ITER. It was intended that FACETS be highly flexible, through the use of modern computational methods, including component technology and object oriented design, to facilitate switching from one model to another for a given aspect of the physics, and making it possible to use simplified models for rapid turnaround or high-fidelity models that will take advantage of the largest supercomputer hardware. FACETS was designed in a heterogeneous parallel context, where different parts of the application can take advantage through parallelism based on task farming, domain decomposition, and/or pipelining as needed and applicable. As with all fusion simulations, an integral part of the FACETS project was treatment of the coupling of different physical processes at different scales interacting closely. A primary example for the FACETS project is the coupling of existing core and edge simulations, with the transport and wall interactions described by reduced models. However, core and edge simulations themselves involve significant coupling of different processes with large scale differences. Numerical treatment of coupling is impacted by a number of factors including, scale differences, form of information transferred between processes, implementation of solvers for different codes, and high performance computing concerns. Operator decomposition involving the computation of the individual processes individually using appropriate simulation codes and then linking/synchronizing the component simulations at regular points in space and time, is the defacto approach to high performance simulation of multiphysics

  15. System control model of a turbine for a BWR; Modelo del sistema de control de una turbina para un BWR

    Energy Technology Data Exchange (ETDEWEB)

    Vargas O, Y. [Universidad del Valle de Mexico, Campus Toluca, Av. Las Palmas No. 136, Col. San Jorge Pueblo Nuevo, 52140 Metepec, Estado de Mexico (Mexico); Amador G, R.; Ortiz V, J.; Castillo D, R.; Delfin L, A. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico)], e-mail: rodolfo.amador@inin.gob.mx

    2009-10-15

    In this work is presented a design of a control system of a turbine for a nuclear power plant with a BWR like energy source. The model seeks to implement later on at thermal hydraulics code of better estimate RELAP/SCDAPSIM. The model is developed for control and protection of turbine, and the consequent protection to the BWR, considering that the turbine control could be employed for one or several turbines in series. The quality of present designs of control pattern of turbine it is that it considers the parameters more important in the operation of a turbine besides that is has incorporated at control the secondary parameters that will be activated originally as true when the turbine model is substituted by a model more detailed. The development of control model of a turbine will be good in short and medium term to realize analysis about the operation of turbine with different operation conditions, of vapor extraction specific steps of turbine to feed other equipment s, besides analyzing the separate effect and integrated effect. (Author)

  16. Studies of fragileness in steels of vessels of BWR reactors; Estudios de fragilizacion en aceros de vasija de reactores BWR

    Energy Technology Data Exchange (ETDEWEB)

    Robles, E.F.; Balcazar, M.; Alpizar, A.M.; Calderon, B.E. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)

    2003-07-01

    The structural materials with those that are manufactured the pressure vessels of the BWR reactors, suffer degradation in its mechanical properties mainly to the damage taken place by the fast neutrons (E > 1 MeV) coming from the reactor core. Its are experimentally studied those mechanisms of neutron damage in this material type, by means of the irradiation of steel vessel in experimental reactors to age them quickly. Alternatively it is simulated the neutron damage by means of irradiation of steel with heavy ions. In this work those are shown first results of the damage induced by irradiation from a similar steel to the vessel of a BWR reactor. The irradiation was carried out with fast neutrons (E > 1 MeV, fluence of 1.45 x 10{sup 18} n/cm{sup 2}) in the TRIGA MARK lll reactor and separately with Ni{sup +3} ions in a Tandetrom accelerator, E = 4.8 MeV and range of the ionic flow of 0.1 to 53 iones/A{sup 2}. (Author)

  17. FIST small break accident analysis with BWR TRACBO2-pretest predictions

    International Nuclear Information System (INIS)

    Alamgir, M.; Sutherland, W.A.

    1984-01-01

    The BWR Full Integral Simulation Test (FIST) program includes experimental simulation and analytical evaluation of BWR thermal-hydraulic phenomena during transient events. One such event is a small size break in the suction line of one of the recirculation pumps. The results from a test simulating this transient in the FIST facility are compared with a system analysis using the Transient Reactor Analysis Code (TRACB02). This comparison demonstrates BWR-TRAC capability for small break analyses and provides detailed understanding of the phenomena

  18. Water chemistry control practices and data of the European BWR fleet

    International Nuclear Information System (INIS)

    Stellwag, B.; Laendner, A.; Weiss, S.; Huettner, F.

    2010-01-01

    Nineteen BWR plants are in operation in Europe, nine built by ASEA Atom, six by Siemens KWU and four by General Electric. This paper gives an overview of water chemistry operation practices and parameters of the European BWR plants. General design characteristics of the plants are described. Chemistry control strategies and underlying water chemistry guidelines are summarized. Chemistry data are presented and discussed with regard to plant design characteristics. The paper is based on a contract of the European BWR Forum with AREVA on a chemistry sourcebook for member plants. The survey of chemistry data was conducted for the years 2002 to 2008. (author)

  19. Study of behavior on bonding and failure mode of pressurized and doped BWR fuel rod

    International Nuclear Information System (INIS)

    Yanagisawa, Kazuaki

    1992-03-01

    The study of transient behavior on the bonding and the failure mode was made using the pressurized/doped 8 x 8 BWR type fuel rod. The dopant was mullite minerals consisted mainly of silicon and aluminum up to 1.5 w/o. Pressurization of the fuel rod with pure helium was made to the magnitude about 0.6 MPa. As a reference, the non-pressurized/non-doped 8 x 8 BWR fuel rod and the pressurized/7 x 7 BWR fuel rod up to 0.6 MPa were prepared. Magnitude of energy deposition given to the tested fuel rods was 248, 253, and 269 cal/g·fuel, respectively. Obtained results from the pulse irradiation in NSRR are as follows. (1) It was found from the experiment that alternation of the fuel design by the adoption of pressurization up to 0.6 MPa and the use of wider gap up to 0.38 mm could avoid the dopant BWR fuel from the overall bonding. The failure mode of the present dopant fuel was revealed to be the melt combined with rupture. (2) The time of fuel failure of the pressurized/doped 8 x 8 BWR fuel defected by the melt/rupture mode is of order of two times shorter than that of the pressurized/ 7 x 7 BWR defected by the rupture mode. Failure threshold of the pressurized/doped 8 x 8 BWR BWR tended to be lower than that of non-pressurized/non-doped 8 x 8 BWR one. Cracked area of the pressurized/doped 8 x 8 BWR was more wider and magnitude of oxidation at the place is relatively larger than the other tested fuels. (3) Failure mode of the non-pressurized/ 8 x 8 BWR fuel rod was the melt/brittle accompanied with a significant bonding at failed location. While, failure mode of the pressurized/ 7 x 7 BWR fuel rod was the cladding rupture accompanied with a large ballooning. No bonding at failed location of the latter was observed. (author)

  20. Nuclear plant analyzer development and analysis applications

    International Nuclear Information System (INIS)

    Laats, E.T.

    1984-01-01

    The Nuclear Plant Analyzer (NPA) is being developed as the U.S. Nuclear Regulatory Commission's (NRC's) state of the art safety analysis and engineering tool to address key nuclear plant safety issues. The NPA integrates the NRC's computerized reactor behavior simulation codes such as RELAP5 and TRAC-BWR, both of which are well-developed computer graphics programs, and large repositories of reactor design and experimental data. Utilizing the complex reactor behavior codes as well as the experiment data repositories enables simulation applications of the NPA that are generally not possible with more simplistic, less mechanistic reactor behavior codes. These latter codes are used in training simulators or with other NPA-type software packages and are limited to displaying calculated data only. This paper describes four applications of the NPA in assisting reactor safety analyses. Two analyses evaluated reactor operating procedures, during off-normal operation, for a pressurized water reactor (PWR) and a boiling water reactor (BWR), respectively. The third analysis was performed in support of a reactor safety experiment conducted in the Semiscale facility. The final application demonstrated the usefulness of atmospheric dispersion computer codes for site emergency planning purposes. An overview of the NPA and how it supported these analyses are the topics of this paper