  1. DIMETHYL ETHER (DME)-FUELED SHUTTLE BUS DEMONSTRATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Elana M. Chapman; Shirish Bhide; Jennifer Stefanik; Howard Glunt; Andre L. Boehman; Allen Homan; David Klinikowski

    2003-04-01

    The objectives of this research and demonstration program are to convert a campus shuttle bus to operation on dimethyl ether, a potential ultra-clean alternative diesel fuel. To accomplish this objective, this project includes laboratory evaluation of a fuel conversion strategy, as well as, field demonstration of the DME-fueled shuttle bus. Since DME is a fuel with no lubricity (i.e., it does not possess the lubricating quality of diesel fuel), conventional fuel delivery and fuel injection systems are not compatible with dimethyl ether. Therefore, to operate a diesel engine on DME one must develop a fuel-tolerant injection system, or find a way to provide the necessary lubricity to the DME. In this project, they have chosen the latter strategy in order to achieve the objective with minimal need to modify the engine. Their strategy is to blend DME with diesel fuel, to obtain the necessary lubricity to protect the fuel injection system and to achieve low emissions. The bulk of the efforts over the past year were focused on the conversion of the campus shuttle bus. This process, started in August 2001, took until April 2002 to complete. The process culminated in an event to celebrate the launching of the shuttle bus on DME-diesel operation on April 19, 2002. The design of the system on the shuttle bus was patterned after the system developed in the engine laboratory, but also was subjected to a rigorous failure modes effects analysis (FMEA, referred to by Air Products as a ''HAZOP'' analysis) with help from Dr. James Hansel of Air Products. The result of this FMEA was the addition of layers of redundancy and over-pressure protection to the system on the shuttle bus. The system became operational in February 2002. Preliminary emissions tests and basic operation of the shuttle bus took place at the Pennsylvania Transportation Institute's test track facility near the University Park airport. After modification and optimization of the system on

  2. City of Chula Vista hydrogen fuel cell bus demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, B.; Bamberger, B.

    1996-10-01

    Hydrogen as an energy carrier and fuel has potential for various uses including electricity, commercial, residential, transportation, and industrial. It is an energy carrier that can be produced from a variety of primary sources and potentially can accomplish these various uses while significantly reducing pollution by substituting for or reducing the use of fossil fuels. One of the most immediate and potentially viable roles for hydrogen as an energy carrier will be its use as a transportation fuel, especially in densely populated urban areas where automotive emissions contribute significantly to air pollution. The Department of Energy`s commitment to research and development of hydrogen as an alternative fuel, and California`s Zero Emission Vehicle (ZEV) requirements, both provide the impetus and favorable circumstance for demonstrating hydrogen as a transportation fuel on an urban bus system. The purpose of this project is to demonstrate the feasibility of using solid polymer fuel cells in a hydrogen-powered electric drive system for an urban transit bus application. Fuel cell buses use hydrogen fuel and oxygen from the air to produce electrical power with the only byproduct being pure water. Proton Exchange Membrane (PEM) fuel cells are proposed for this project. Current evidence suggests that fuel cells, which rely on hydrogen and a process known as proton exchange to generate their power, appear to have an infinite life span. All exhaust pollution is completely eliminated, resulting in a Zero Emission Vehicle (ZEV). An urban bus system offers the potential for developing a market for the production of hydrogen propulsion technology due to extensive vehicular use in densely populated areas experiencing pollution from numerous sources, and because the central garaging facilities or the bus system facilitates fueling and maintenance functions.

  3. Bavarian liquid hydrogen bus demonstration project - safety, licensing and acceptability aspects

    Energy Technology Data Exchange (ETDEWEB)

    Wurster, R.; Knorr, H.; Pruemm, W.

    1999-07-01

    A regular 12 m city bus of the MAN SL 202 type with an internal combustion engine adapted to hydrogen operation and auxiliary gasoline operation was demonstrated in the Bavarian cities of Erlangen and Munich between April 1996 and August 1998. Three bus operators, Erlanger Stadtwerke, Stadtwerke Muenchen and Autobus Oberbayern were testing the bus in three different operating schemes. In order to be able to perform this worldwide first public demonstration of a liquid hydrogen (LH{sub 2}) city bus in regular service, several requirements with respect to safety, licensing, training and acceptability had to be fulfilled. These activities were focusing mainly on the hydrogen specific issues such as (a) integration of onboard LH{sub 2} storage vessels, piping and instrumentation, (b) implementation of storage and refueling infrastructure in the operators' yards, (c) adaptation of the maintenance garages, (d) training of operating and maintenance personnel. During phase II of the demonstration activity a poll was performed on passengers traveling onboard the hydrogen-powered city bus in order to determined the level of acceptance among the users of the bus. The bus was designed and manufactured by MAN Nutzfahrzeuge Aktiengesellschaft. The cryogenic fuel storage and the refueling equipment were designed and manufactured by Linde AG. The realization of the hardware was financially supported by the European Commission (EC) within the Euro-Quebec Hydro-Hydrogen Pilot Project. The demonstration phase was financially supported by EC and the Bavarian State Government. Ludwig-Boelkow-Systemtechnik performed project monitoring for both funding organizations. The presentation will summarize the most important results of this demonstration phase and will address the measures undertaken in order to get the bus, the refueling infrastructure and the maintenance and operating procedures approved by the relevant authorities.

  4. Savannah River bus project

    Energy Technology Data Exchange (ETDEWEB)

    Summers, W.A. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1998-08-01

    The H2Fuel Bus is the world`s first hybrid hydrogen electric transit bus. It was developed through a public/private partnership involving several leading technology and industrial organizations in the Southeast, with primary funding and program management provided by the Department of Energy. The primary goals of the project are to gain valuable information on the technical readiness and economic viability of hydrogen buses and to enhance the public awareness and acceptance of emerging hydrogen technologies. The bus has been operated by the transit agency in Augusta, Georgia since April, 1997. It employs a hybrid IC engine/battery/electric drive system, with onboard hydrogen fuel storage based on the use of metal hydrides. Initial operating results have demonstrated an overall energy efficiency (miles per Btu) of twice that of a similar diesel-fueled bus and an operating range twice that of an all-battery powered electric bus. Tailpipe emissions are negligible, with NOx less than 0.2 ppm. Permitting, liability and insurance issues were addressed on the basis of extensive risk assessment and safety analyses, with the inherent safety characteristic of metal hydride storage playing a major role in minimizing these concerns. Future plans for the bus include continued transit operation and use as a national testbed, with potential modifications to demonstrate other hydrogen technologies, including fuel cells.

  5. Mercer County off-peak fare-free bus demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Dommasch, I.N.; Hollinger, R.L.

    1979-07-01

    A system-wide, off-peak fare-free bus demonstration project is being conducted in Mercer County, New Jersey to study effects of fare-free bus operation. Data collected for 2 1/2 months of operation are presented. Since implementation of the fare-free service, Mercer Metro off-peak ridership has increased approximately 45 to 50%. This equates to an overall system-wide ridership increase of about 10 to 15%. One effect of the fare-free operation has been to increase bus run times, caused in part by accompanying increases in the occurrence and length of bus delays in the downtown area. The percentage of filled bus seats has changed from about 10% before the demonstration, to over 50% after the off-peak fares were eliminated.

  6. FUEL CELL BUS DEMONSTRATION IN MEXICO CITY

    Science.gov (United States)

    The report discusses the performance of a cull-size, zero-emission, Proton Exchange Membrane (PEM) fuel-cell-powered transit bus in the atmospheric environment of Mexico City. To address the air quality problems caused by vehicle emissions in Mexico City, a seminar on clean vehic...

  7. American Fuel Cell Bus Project Evaluation. Second Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.

  8. Foothill Transit Battery Electric Bus Demonstration Results

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Prohaska, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kelly, Kenneth [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-01-27

    Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate its fleet of Proterra battery electric buses (BEBs) in revenue service. The focus of this evaluation is to compare performance of the BEBs to that of conventional technology and to track progress over time toward meeting performance targets. This project has also provided an opportunity for DOE to conduct a detailed evaluation of the BEBs and charging infrastructure. This report provides data on the buses from April 2014 through July 2015. Data are provided on a selection of compressed natural gas buses as a baseline comparison.

  9. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O. [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  10. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  11. Southern Nevada Alternative Fuels Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Hyde, Dan; Fast, Matthew

    2009-12-31

    The Southern Nevada Alternative Fuels Program is designed to demonstrate, in a day-to-day bus operation, the reliability and efficiency of a hydrogen bus operation under extreme conditions. By using ICE technology and utilizing a virtually emission free fuel, benefits to be derived include air quality enhancement and vehicle performance improvements from domestically produced, renewable energy sources. The project objective is to help both Ford and the City demonstrate and evaluate the performance characteristics of the E-450 H2ICE shuttle buses developed by Ford, which use a 6.8-liter supercharged Triton V-10 engine with a hydrogen storage system equivalent to 29 gallons of gasoline. The technology used during the demonstration project in the Ford buses is a modified internal combustion engine that allows the vehicles to run on 100% hydrogen fuel. Hydrogen gives a more thorough fuel burn which results in more power and responsiveness and less pollution. The resultant emissions from the tailpipe are 2010 Phase II compliant with NO after treatment. The City will lease two of these E-450 H2ICE buses from Ford for two years. The buses are outfitted with additional equipment used to gather information needed for the evaluation. Performance, reliability, safety, efficiency, and rider comments data will be collected. The method of data collection will be both electronically and manually. Emissions readings were not obtained during the project. The City planned to measure the vehicle exhaust with an emissions analyzer machine but discovered the bus emission levels were below the capability of their machine. Passenger comments were solicited on the survey cards. The majority of comments were favorable. The controllable issues encountered during this demonstration project were mainly due to the size of the hydrogen fuel tanks at the site and the amount of fuel that could be dispensed during a specified period of time. The uncontrollable issues encountered during this

  12. Nucla CFB Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  13. Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Craig [National Rural Electric Cooperative Association, Arlington, VA (United States); Carroll, Paul [National Rural Electric Cooperative Association, Arlington, VA (United States); Bell, Abigail [National Rural Electric Cooperative Association, Arlington, VA (United States)

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  14. Tidd PFBC demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Marrocco, M. [American Electric Power, Columbus, OH (United States)

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  15. BC Transit Fuel Cell Bus Project: Evaluation Results Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, L.; Post, M.

    2014-02-01

    This report evaluates a fuel cell electric bus demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. This evaluation report covers two years of revenue service data on the buses from April 2011 through March 2013.

  16. PFBC Utility Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  17. BC Transit Fuel Cell Bus Project Evaluation Results: Second Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, L.; Post, M.

    2014-09-01

    Second report evaluating a fuel cell electric bus (FCEB) demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. NREL published its first report on the demonstration in February 2014. This report is an update to the previous report; it covers 3 full years of revenue service data on the buses from April 2011 through March 2014 and focuses on the final experiences and lessons learned.

  18. Research, development and demonstration of a fuel cell/battery powered bus system. Phase 1, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-02-28

    Purpose of the Phase I effort was to demonstrate feasibility of the fuel cell/battery system for powering a small bus (under 30 ft or 9 m) on an urban bus route. A brassboard powerplant was specified, designed, fabricated, and tested to demonstrate feasibility in the laboratory. The proof-of-concept bus, with a powerplant scaled up from the brassboard, will be demonstrated under Phase II.

  19. Solar Thermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Biesinger, K; Cuppett, D; Dyer, D

    2012-01-30

    HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with Kalwall building panels. An added feature of the Kalwall system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

  20. LIMB Demonstration Project Extension and Coolside Demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO[sub 2]) and nitrogen oxides (NO[sub x]) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison's Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0[sub 2] removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0[sub 2] emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  1. Laser Communications Relay Demonstration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Laser Communications Relay Demonstration project will advance optical communications technology, expanding industry’s capability to produce competitive,...

  2. Thermal test results of the two-phase thermal bus technology demonstration loop

    Science.gov (United States)

    Edelstein, Fred; Liandris, Maria; Rankin, J. Gary

    1987-01-01

    A two-phase heat transport system, the Thermal Bus Technology Demonstrator, has been built and tested for NASA Johnson Space Center for application on Space Station. The loop is a separated two-phase system that uses evaporator flow control valves and liquid condenser flooding to achieve temperature control. Both ambient and thermal vacuum tests have been completed in NASA's Chamber A, initially using Freon-11 and then ammonia as the working fluid. Overall, the tests were quite successful, with the bus achieving all major test objectives, including operation at 19.5 kW and set points at 35 F (1.7 C), 70 F (21.1 C) and 104 F (40.0 C), load sharing, asymmetrical heating and isothermality around the loop. Low plate to vapor temperature drops were obtained for the monogroove cold plate using ammonia and are indicative of the high evaporative film coefficients obtainable with this design.

  3. Multi-Gigabit Rate Radiation Hard Bus Project

    Data.gov (United States)

    National Aeronautics and Space Administration — High speed robust very low power radiation hardened bus interconnects are required to accelerate on-board computations, further improve reconfigurability and upgrade...

  4. Clean Coal Diesel Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Robert Wilson

    2006-10-31

    A Clean Coal Diesel project was undertaken to demonstrate a new Clean Coal Technology that offers technical, economic and environmental advantages over conventional power generating methods. This innovative technology (developed to the prototype stage in an earlier DOE project completed in 1992) enables utilization of pre-processed clean coal fuel in large-bore, medium-speed, diesel engines. The diesel engines are conventional modern engines in many respects, except they are specially fitted with hardened parts to be compatible with the traces of abrasive ash in the coal-slurry fuel. Industrial and Municipal power generating applications in the 10 to 100 megawatt size range are the target applications. There are hundreds of such reciprocating engine power-plants operating throughout the world today on natural gas and/or heavy fuel oil.

  5. Demonstration projects : learning by experience : the Seabird Island demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2009-10-15

    This article described the Seabird Island sustainable community housing demonstration project near Agassiz, British Columbia. The project provides a sustainable, affordable place for 7 families and demonstrates a new way to build and design communities using renewable energy technologies to provide residents with better quality, energy efficient housing while reducing costs and minimizing environmental impacts. The design integrates renewable energy sources such as wind, solar and geothermal energy to save on heating and lighting costs. This article noted some of the dubious design features that could have been screened out at the design stage if careful analysis had been carried out. It described features such as the solar orientation; climatic factors that influenced the form and details of the building; the high-efficiency, condensing, natural gas water heater for space heating combined with a forced-air and radiant-floor heating system; solariums that provided solar preheating of domestic hot water; ventilation air preheating; the solar roof; an earth-tube ventilation system; and 3 wind turbines to generate electricity to offset conventional electricity sources. Canada Mortgage and Housing Corporation has monitored several of the systems in order to evaluate the extent to which these features have influenced the performance of the dwelling units. The energy use in all 7 units was documented along with indoor air quality. An energy performance rating of EnerGuide 80 was achieved, which is comparable to R-2000. The monitoring study revealed that wind energy at this location was not sufficient to justify the installation of the wind turbines. The solar steel roof/solarium energy system did not perform as expected. In addition, the earth-tube ventilation system provided little heat and its overall contribution to ventilation was uncertain. Other deficiencies were also noted, such as leaky ductwork, non-operational dampers and poorly integrated control systems. The

  6. 77 FR 5295 - Over-the-Road Bus Accessibility Program Announcement of Project Selections

    Science.gov (United States)

    2012-02-02

    ... by Section 3038 of the Transportation Equity Act for the 21st Century (TEA-21). The OTRB... FTA's Transportation Electronic Awards Management System (TEAM) for the projects identified in Tables... TRANSPORTATION Federal Transit Administration Over-the-Road Bus Accessibility Program Announcement of...

  7. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Ludwig, Dale [Missouri Soybean Association, Jefferson City, MO (United States); Hamilton, Jill [Sustainable Energy Strategies, Inc., Fairfax, VA (United States)

    2011-10-27

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry education program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was expected to

  8. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  9. Ultra-Clean Fischer-Tropsch Fuels Production and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Steve Bergin

    2005-10-14

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: Dynamometer Durability Testing, the Denali Bus Fleet Demonstration, Bus Fleet Demonstrations Emissions Analysis, Impact of SFP Fuel on Engine Performance, Emissions Analysis, Feasibility Study of SFPs for Rural Alaska, and Cold Weather Testing of Ultra Clean Fuel.

  10. Vehicle to Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Willett Kempton; Meryl Gardner; Michael Hidrue; Fouad Kamilev; Sachin Kamboj; Jon Lilley; Rodney McGee; George Parsons; Nat Pearre; Keith Trnka

    2010-12-31

    This report summarizes the activities and accomplishments of a two-year DOE-funded project on Grid-Integrated Vehicles (GIV) with vehicle to grid power (V2G). The project included several research and development components: an analysis of US driving patterns; an analysis of the market for EVs and V2G-capable EVs; development and testing of GIV components (in-car and in-EVSE); interconnect law and policy; and development and filing of patents. In addition, development activities included GIV manufacturing and licensing of technologies developed under this grant. Also, five vehicles were built and deployed, four for the fleet of the State of Delaware, plus one for the University of Delaware fleet.

  11. Integrated Ground Operations Demonstration Units Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the project is to demonstrate cost efficient cryogenic operations on a relevant scale that can be projected onto future Spaceport architectures...

  12. The GeoBus project: a mobile Earth science outreach project for secondary schools in the UK

    Science.gov (United States)

    Robinson, R. A.; Roper, K. A.; Macfarlane, D.; Pike, C.

    2013-12-01

    GeoBus is an educational outreach project that was developed in 2012 by the Department of Earth and Environmental Sciences at the University of St Andrews. It is sponsored jointly by industry and the UK Research Councils (NERC and EPSRC). The aims of GeoBus are to support the teaching of Earth Science in secondary (high) schools by providing teaching resources that are not readily available to educators, to inspire young learners by incorporating new science research outcomes in teaching activities, and to provide a bridge between industry, higher education institutions, research councils and schools. These linkages are important for introducing career opportunities in Earth sciences. Since its launch, GeoBus has visited over 140 different schools across the length and breadth of Scotland. Over 20,000 pupils will have been involved in practical hands-on Earth science learning activities by December 2013, including many in remote and disadvantaged regions. The resources that GeoBus brings to schools include all the materials and equipment needed to run workshops, field excursions and Enterprise Challenges. GeoBus provides 16 workshops which can be adapted for different learning levels. Workshops are 50 to 80 minute sessions for up to 30 pupils and topics include minerals, rocks, fossils, geological time, natural resources, climate change, volcanoes, earthquakes, and geological mapping. As with all GeoBus activities, the inclusion of equipment and technology otherwise unavailable to schools substantially increases the engagement of pupils in workshops. Field excursions are popular, as many teachers have little or no field trainng and feel unable to lead this type of activity. The excursions comprise half or full day sessions for up to 30 pupils and are tailored to cover the local geology or geomorphology. The Enterprise Challenges are half or full day sessions for up to 100 pupils. Current topics are Drilling for Oil, Renewable Energy, a Journey to Mars and Scotland

  13. Irvine Smart Grid Demonstration, a Regional Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Yinger, Robert [Southern California Edison Company, Rosemead, CA (United States); Irwin, Mark [Southern California Edison Company, Rosemead, CA (United States)

    2015-12-29

    ISGD was a comprehensive demonstration that spanned the electricity delivery system and extended into customer homes. The project used phasor measurement technology to enable substation-level situational awareness, and demonstrated SCE’s next-generation substation automation system. It extended beyond the substation to evaluate the latest generation of distribution automation technologies, including looped 12-kV distribution circuit topology using URCIs. The project team used DVVC capabilities to demonstrate CVR. In customer homes, the project evaluated HAN devices such as smart appliances, programmable communicating thermostats, and home energy management components. The homes were also equipped with energy storage, solar PV systems, and a number of energy efficiency measures (EEMs). The team used one block of homes to evaluate strategies and technologies for achieving ZNE. A home achieves ZNE when it produces at least as much renewable energy as the amount of energy it consumes annually. The project also assessed the impact of device-specific demand response (DR), as well as load management capabilities involving energy storage devices and plug-in electric vehicle charging equipment. In addition, the ISGD project sought to better understand the impact of ZNE homes on the electric grid. ISGD’s SENet enabled end-to-end interoperability between multiple vendors’ systems and devices, while also providing a level of cybersecurity that is essential to smart grid development and adoption across the nation. The ISGD project includes a series of sub-projects grouped into four logical technology domains: Smart Energy Customer Solutions, Next-Generation Distribution System, Interoperability and Cybersecurity, and Workforce of the Future. Section 2.3 provides a more detailed overview of these domains.

  14. Tidd PFBC Demonstration Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2001-08-31

    The Clean Coal Technology (CCT) Demonstration Program is a government and industry co-funded technology development effort to demonstrate a new generation of innovative coal utilization processes. One goal of the program is to furnish the energy marketplace with a variety of energy efficient, environmentally superior coal-based technologies. Demonstration projects seek to establish the commercial feasibility of the most promising coal technologies that have proceeded beyond the proof-of-concept stage. This report is a post-project assessment of the DOE CCT Demonstration Program, the Tidd PFBC Demonstration Project. A major objective of the CCT Program is to provide the technical data necessary for the private sector to proceed confidently with the commercial replication of the demonstrated technologies. An essential element of meeting this goal is the dissemination of results from the demonstration projects. This post-project assessment (PPA) report is an independent DOE appraisal of the successes that the completed project had in achieving its objectives and aiding in the commercialization of the demonstrated technology. The report also provides an assessment of the expected technical, environmental, and economic performance of the commercial version of the technology, as well as an analysis of the commercial market.

  15. Projections of automobile, light truck, and bus stocks and sales, to the year 2000

    Energy Technology Data Exchange (ETDEWEB)

    Knorr, R.; Millar, M.

    1979-11-01

    Future stocks and sales of automobiles, light trucks, and buses are projected in this document. Automobile projections are developed for fleet and non-fleet sectors. Total auto stock is projected as a function of the number of households and of personal income, with adjustment for present and anticipated shifts from automobiles to light trucks. Automobile stocks and sales are projected to increase steadily through the year 2000 with a slightly larger growth rate associated with fleet autos. Projections of light-truck stocks and sales are developed for personal, service/utility, agriculture, manufacturing, government, wholesale/retail, and other uses based on anticipated employment and output for each of the use sectors. Projections anticipate the largest growth area to be that of personal light trucks. Bus stocks and sales are projected as a function of user populations, existing fleet characteristics, and anticipated usage patterns. School, intercity, and transit buses are included in the study. School buses are projected to have the largest percentage of growth in this sector.

  16. Medicare Demonstration Projects and Evaluation Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) conducts and sponsors a number of innovative demonstration projects to test and measure the effect of potential...

  17. LIMB Demonstration Project Extension and Coolside Demonstration. [Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison`s Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0{sub 2} removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0{sub 2} emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  18. NASA's Involvement in Technology Development and Transfer: The Ohio Hybrid Bus Project

    Science.gov (United States)

    Viterna, Larry A.

    1997-01-01

    A government and industry cooperative is using advanced power technology in a city transit bus that will offer double the fuel economy, and reduce emissions to one tenth of government standards. The heart of the vehicle's power system is a natural gas fueled generator unit. Power from both the generator and an advanced energy storage system is provided to a variable speed electric motor attached to the rear drive axle. A unique aspect of the vehicle's design is its use of "super" capacitors for recovery of energy during braking. This is the largest vehicle ever built using this advanced energy recovery technology. This paper describes the project goals and approach, results of its system performance modeling, and the status of the development team's effort.

  19. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results: Third Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, L.; Post, M.

    2014-05-01

    This report presents results of a demonstration of 12 fuel cell electric buses (FCEB) operating in Oakland, California. The 12 FCEBs operate as a part of the Zero Emission Bay Area (ZEBA) Demonstration, which also includes two new hydrogen fueling stations. This effort is the largest FCEB demonstration in the United States and involves five participating transit agencies. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. NREL has published two previous reports, in August 2011 and July 2012, describing operation of these buses. New results in this report provide an update covering eight months through October 2013.

  20. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration: First Results Report

    Energy Technology Data Exchange (ETDEWEB)

    Chandler, K.; Eudy, L.

    2011-08-01

    This report documents the early implementation experience for the Zero Emission Bay Area (ZEBA) Demonstration, the largest fleet of fuel cell buses in the United States. The ZEBA Demonstration group includes five participating transit agencies: AC Transit (lead transit agency), Santa Clara Valley Transportation Authority (VTA), Golden Gate Transit (GGT), San Mateo County Transit District (SamTrans), and San Francisco Municipal Railway (Muni). The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service.

  1. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results: Fifth Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-06-01

    This report presents results of a demonstration of fuel cell electric buses (FCEB) operating in Oakland, California. Alameda-Contra Costa Transit District (AC Transit) leads the Zero Emission Bay Area (ZEBA) demonstration, which includes 13 advanced-design fuel cell buses and two hydrogen fueling stations. The ZEBA partners are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. NREL has published four previous reports describing operation of these buses. This report presents new and updated results covering data from January 2015 through December 2015.

  2. Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration Results. Fourth Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-07-02

    This report presents results of a demonstration of fuel cell electric buses (FCEB) operating in Oakland, California. Alameda-Contra Costa Transit District (AC Transit) leads the Zero Emission Bay Area (ZEBA) demonstration, which includes 12 advanced-design fuel cell buses and two hydrogen fueling stations. The FCEBs in service at AC Transit are 40-foot, low-floor buses built by Van Hool with a hybrid electric propulsion system that includes a US Hybrid fuel cell power system and EnerDel lithium-based energy storage system. The buses began revenue service in May 2010.

  3. 燃料电池公共汽车在北京和上海载客示范评价%Evaluation on Fuel Cell Bus Demonstration in Beijing and Shanghai

    Institute of Scientific and Technical Information of China (English)

    王菊; 尤可为; 于丹

    2013-01-01

    The fuel cell bus demonstration in Beijing and Shanghai is evaluated and analyzed in this paper, the life cycle assessment (LCA) for fuel cell bus demonstration in Beijing is conducted by the energy analysis method of GREET. The total energy consumption, fossil energy consumption, petroleum energy consumption, greenhouse gas emission and economy are calculated for the fuel cell bus using different hydrogen production way such as water electrolysis and natural gas reforming. The findings can provide reference for future demonstration project.%针对在北京、上海开展的燃料电池公共汽车载客示范运行情况进行了评价分析,并采用全生命周期GREET能量分析方法对北京燃料电池公共汽车示范项目进行了全生命周期综合评价。对于燃料电池汽车采用电解水制氢及天然气重整制氢等不同制氢方式的总能量消耗、化石能量消耗、石油能量消耗、温室气体排放和经济性等进行了综合分析,分析结果可为开展类似的示范项目提供参考。

  4. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  5. Secure Interoperable Open Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Magee, Thoman [Consolidated Edison Company Of New York, Inc., NY (United States)

    2014-12-28

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG

  6. Secure Interoperable Open Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Magee, Thoman

    2014-12-31

    The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG

  7. Brown Grease to Biodiesel Demonstration Project Report

    Energy Technology Data Exchange (ETDEWEB)

    San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

    2013-01-30

    program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP's anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project's environmental impacts were expected to include: Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biodiesel and Methane gas produced in the Anaerobic digester, Carbon Dioxide, is also a greenhouse gas; it is 20 times weaker for the same amount

  8. Education & Collection Facility GSHP Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Joplin, Jeff [Denver Museum of Nature and Science, Denver, CO (United States)

    2015-03-28

    The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to a recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an efficient

  9. Wave Power Demonstration Project at Reedsport, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    Mekhiche, Mike [Principal Investigator; Downie, Bruce [Project Manager

    2013-10-21

    Ocean wave power can be a significant source of large‐scale, renewable energy for the US electrical grid. The Electrical Power Research Institute (EPRI) conservatively estimated that 20% of all US electricity could be generated by wave energy. Ocean Power Technologies, Inc. (OPT), with funding from private sources and the US Navy, developed the PowerBuoy to generate renewable energy from the readily available power in ocean waves. OPT's PowerBuoy converts the energy in ocean waves to electricity using the rise and fall of waves to move the buoy up and down (mechanical stroking) which drives an electric generator. This electricity is then conditioned and transmitted ashore as high‐voltage power via underwater cable. OPT's wave power generation system includes sophisticated techniques to automatically tune the system for efficient conversion of random wave energy into low cost green electricity, for disconnecting the system in large waves for hardware safety and protection, and for automatically restoring operation when wave conditions normalize. As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport, OR, will consist of 10 PowerBuoys located 2.5 miles off the coast. This U.S. Department of Energy Grant funding along with funding from PNGC Power, an Oregon‐based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. At this time, the design and fabrication of this first PowerBuoy and factory testing of the power take‐off subsystem are complete; additionally the power take‐off subsystem has been successfully integrated into the spar.

  10. Medium Duty Electric Vehicle Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Mackie, Robin J. D. [Smith Electric Vehicles Corporation, Kansas City, MO (United States)

    2015-05-31

    The Smith Electric Vehicle Demonstration Project (SDP) was integral to the Smith business plan to establish a manufacturing base in the United States (US) and produce a portfolio of All Electric Vehicles (AEV’s) for the medium duty commercial truck market. Smith focused on the commercial depot based logistics market, as it represented the market that was most ready for the early adoption of AEV technology. The SDP enabled Smith to accelerate its introduction of vehicles and increase the size of its US supply chain to support early market adoption of AEV’s that were cost competitive, fully met the needs of a diverse set of end users and were compliant with Federal safety and emissions requirements. The SDP accelerated the development and production of various electric drive vehicle systems to substantially reduce petroleum consumption, reduce vehicular emissions of greenhouse gases (GHG), and increase US jobs.

  11. Controlled Hydrogen Fleet and Infrastructure Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Dr. Scott Staley

    2010-03-31

    This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to

  12. Mock Site Licensing Demonstration Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Roop, R.D.

    1986-06-01

    The Mock Site Licensing Demonstration Project developed the Low-Level Radioactive Waste Siting Simulation, a role-playing exercise designed to facilitate the process of siting and licensing disposal facilities for low-level waste (LLW). This report describes the development, contant, and usefulness of the siting simulation. The simulation was designed by Harvard University's Program on Negotiation; it can be conducted at a workshop or conference, involves 14 or more participants, and requires about eight hours to complete. The simulation consists of two sessions. In the first, participants negotiate the selection of siting criteria, and in the second, a preferred site for a facility is chosen from three candidate sites. The project sponsored two workshops (in Boston, Massachusetts and Richmond, Virginia) in which the simulation was conducted for persons involved in planning for LLW. It is concluded that the siting simulation can be useful in three ways: (1) as a tool for information dissemination, (2) as a vehicle that can foste communication among parties in conflict, and (3) as a step toward consensus building and conflict resolution. The DOE National Low-Level Waste Management Program is now making the siting simulation available for use by states, regional compacts, and other organizations involved in development of LLW disposal facilities.

  13. The mobile GeoBus outreach project: hands-on Earth and Mars activities for secondary schools in the UK

    Science.gov (United States)

    Robinson, Ruth; Pike, Charlotte; Roper, Kathryn

    2015-04-01

    GeoBus (www.geobus.org.uk) is an educational outreach project that was developed in 2012 by the Department of Earth and Environmental Sciences at the University of St Andrews, and it is sponsored jointly by industry and the UK Research Councils (NERC and EPSRC). The aims of GeoBus are to support the teaching of Earth Science in secondary schools by providing teaching resources that are not readily available to educators, to inspire young learners by incorporating new science research outcomes in teaching activities, and to provide a bridge between industry, higher education institutions, research councils and schools. Since its launch, GeoBus has visited over 160 different schools across the length and breadth of Scotland. Just under 35,000 pupils have been involved in practical hands-on Earth science learning activities since the project began in 2012, including many in remote and disadvantaged regions. The resources that GeoBus brings to schools include all the materials and equipment needed to run 50 - 80 minute workshops, and half- or whole-day Enterprise Challenges and field excursions. Workshops are aimed at a class of up to 30 pupils and topics include minerals, rocks, fossils, geological time, natural resources, climate change, volcanoes, earthquakes, and geological mapping. As with all GeoBus activities, the inclusion of equipment and technology otherwise unavailable to schools substantially increases the engagement of pupils in workshops. Field excursions are increasingly popular, as many teachers have little or no field trainng and feel unable to lead this type of activity. The excursions comprise half or full day sessions for up to 30 pupils and are tailored to cover the local geology or geomorphology. Enterprise Challenge are half or full day sessions for up to 100 pupils. Topics include "Journey to Mars", "Scotland's Rocks", "Drilling for Oil", and "Renewable Energy". Both of the energy Enterprise Challenges were designed to incorporates ideas and

  14. PFBC Utility Demonstration Project. Annual report, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-11-01

    This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

  15. Brown Grease to Biodiesel Demonstration Project Report

    Energy Technology Data Exchange (ETDEWEB)

    San Francisco Public Utilities Commission; URS Corporation; Biofuels, Blackgold; Carollo Engineers

    2013-01-30

    program by other municipal agencies (as applicable). In order to accomplish the goals of the project, the following steps were performed: 1. Operation of a demonstration facility designed to receive 10,000 to 12,000 gallons of raw Trap Waste each day from private Trap Waste hauling companies. The demonstration facility was designed and built by Pacific Biodiesel Technologies (PBTech). The demonstration facility would also recover 300 gallons of Brown Grease per day from the raw Trap Waste. The recovered Brown Grease was expected to contain no more than 2% Moisture, Insolubles, and Unsaponifiables (MIU) combined. 2. Co-digestion of the side streams (generated during the recovery of 300 gallons of Brown Grease from the raw Trap Waste) with wastewater sludge in the WWTP's anaerobic digesters. The effects of the side streams on anaerobic digestion were quantified by comparison with baseline data. 3. Production of 240 gallons per day of ASTM D6751-S15 grade Biodiesel fuel via a Biodiesel conversion demonstration facility, with the use of recovered Brown Grease as a feedstock. The demonstration facility was designed and built by Blackgold Biofuels (BGB). Side streams from this process were also co-digested with wastewater sludge. Bench-scale anaerobic digestion testing was conducted on side streams from both demonstration facilities to determine potential toxicity and/or changes in biogas production in the WWTP anaerobic digester. While there is a lot of theoretical data available on the lab-scale production of Biodiesel from grease Trap Waste, this full-scale demonstration project was one of the first of its kind in the United States. The project's environmental impacts were expected to include: Reduction of greenhouse gas emissions by prevention of the release of methane at landfills. Although the combustion product of Biodiesel and Methane gas produced in the Anaerobic digester, Carbon Dioxide, is also a greenhouse gas; it is 20 times weaker for the same amount

  16. Integrated monitoring and surveillance system demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Aumeier, S.E.; Walters, G. [Argonne National Lab., Idaho Falls, ID (United States); Kotter, D.; Walrath, W.M.; Zamecnik, R.J. [Lockheed-Martin Idaho Technologies Company, Idaho Falls, ID (United States)

    1997-07-01

    We present a summary of efforts associated with the installation of an integrated system for the surveillance and monitoring of stabilized plutonium metals and oxides in long-term storage. The product of this effort will include a Pu storage requirements document, baseline integrated monitoring and surveillance system (IMSS) prototype and test bed that will be installed in the Fuel Manufacturing Facility (FMF) nuclear material vault at Argonne National Laboratory - West (ANL-W), and a Pu tracking database including data analysis capabilities. The prototype will be based on a minimal set of vault and package monitoring requirements as derived from applicable DOE documentation and guidelines, detailed in the requirements document, including DOE-STD-3013-96. The use of standardized requirements will aid individual sites in the selection of sensors that best suit their needs while the prototype IMSS, located at ANL-W, will be used as a test bed to compare and contrast sensor performance against a baseline integrated system (the IMSS), demonstrate system capabilities, evaluate potential technology gaps, and test new hardware and software designs using various storage configurations. With efforts currently underway to repackage and store a substantial quantity of plutonium and plutonium-bearing material within the DOE complex, this is an opportune time to undertake such a project. 4 refs.

  17. WSF Biodiesel Demonstration Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

  18. Small-Scale Hydroelectric Power Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  19. 基于CAN总线的电动客车空调控制方案%Air-conditioner Control Project for Electric Bus Based on CAN Bus

    Institute of Scientific and Technical Information of China (English)

    杨桥生

    2012-01-01

    The author simply introduces two kinds of present control modes for air-conditioner of electric bus in domestic market,puts forward a new kind of its control mode based on CAN bus,and design the CAN's messages reports.%简述国内电动客车空调的两种控制模式;提出一种基于CAN总线的电动客车空调控制模式,并设计CAN通讯报文。

  20. Utility Scale Wind turbine Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Terry Fredericks

    2006-03-31

    The purpose of the Three Affiliated Tribes proposing to Department of Energy was nothing new to Denmark. National Meteorological Studies have proved that North Dakota has some of the most consistence wind resources in the world. The Three Affiliated Tribes wanted to assess their potential and become knowledgeable to developing this new and upcoming resource now valuable. By the Tribe implementing the Utility-scale Wind Turbine Project on Fort Berthold, the tribe has proven the ability to complete a project, and has already proceeded in a feasibility studies to developing a large-scale wind farm on the reservation due to tribal knowledge learned, public awareness, and growing support of a Nation wanting clean renewable energy. The tribe is working through the various measures and regulations with the want to be self-sufficient, independent, and marketable with 17,000 times the wind energy needed to service Fort Berthold alone.

  1. Biorefinery Demonstration Project Final Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, David [University of Georgia Research Foundation, Inc., Athens, GA (United States)

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

  2. Milliken Clean Coal Technology Demonstration Project. Project performance summary, Clean Coal Technology Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2002-11-30

    The New York State Electric & Gas Corporation (NYSEG) demonstrated a combination of technologies at its Milliken Station in Lansing, New York, designed to: (1) achieve high sulfur dioxide (SO2) capture efficiency, (2) bring nitrogen oxide (NOx) emissions into compliance with Clean Air Act Amendments of 1990 (CAAA), (3) maintain high station efficiency, and (4) eliminate waste water discharge. This project is part of the U.S. Department of Energy's (DOE) Clean Coal Technology Demonstration Program (CCTDP) established to address energy and environmental concerns related to coal use. DOE sought cost-shared partnerships with industry through five nationally competed solicitations to accelerate commercialization of the most promising advance coal-based power generation and pollution control technologies. The CCTDP, valued at over five billion dollars, has significantly leveraged federal funding by forging effective partnerships founded on sound principles. For every federal dollar invested, CCTDP participants have invested two dollars. These participants include utilities, technology developers, state governments, and research organizations. The project presented here was one of nine selected in January 1991 from 33 proposals submitted in response to the program's fourth solicitation.

  3. Rapid Energy Modeling Workflow Demonstration Project

    Science.gov (United States)

    2014-01-01

    BIM Building Information Model BLCC building life cycle costs BPA Building Performance Analysis CAD computer assisted...utilizes information on operations, geometry, orientation, weather, and materials, generating Three-Dimensional (3D) Building Information Models ( BIM ...executed a demonstration of Rapid Energy Modeling (REM) workflows that employed building information modeling ( BIM ) approaches and

  4. DOE`s annealing prototype demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Warren, J.; Nakos, J.; Rochau, G.

    1997-02-01

    One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable through a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy`s Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana`s Marble Hill nuclear power plant. The MPR team`s annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company`s nuclear power plant at Midland, Michigan. This paper describes the Department`s annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges.

  5. Solar energy parking canopy demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Cylwik, Joe [City of Big Bear Lake, Big Bear, CA (United States); David, Lawrence [City of Big Bear Lake, Big Bear, CA (United States)

    2015-09-24

    The goal of this pilot/demonstration program is to measure the viability of using solar photovoltaic (PV) technology at three locations in a mountain community environment given the harsh weather conditions. An additional goal is to reduce long-term operational costs, minimize green house gas emissions, lower the dependency on energy produced from fossil fuels, and improve the working environment and health of city employees and residents.

  6. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The report summarizes unit operating experience and test program progress for 1989 on Colorado-Ute Electric Association's Nucla CFB Demonstration Program. During this period, the objectives of the Nucla Station operating group were to correct problems with refractory durability, resolve primary air fan capacity limitations, complete the high ash and high sulfur coal tests, switch to Salt Creek coal as the operating fuel, and make the unit available for testing without capacity restrictions. Each of these objectives was addressed and accomplished, to varying degrees, except for the completion of the high sulfur coal acceptance tests. (VC)

  7. Nucla circulating atmospheric fluidized bed demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  8. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  9. The Healthy Bus project in Denmark: need for an action potential assessment.

    Science.gov (United States)

    Poulsen, Kjeld B

    2004-06-01

    Research over the last 50 years has repeatedly documented that bus drivers are exposed to several physical and psychological risk factors, which are associated with health problems in the form of heart, musculo-skeletal and stomach disease, and increased coronary mortality. So why has there been little action to improve the situation when it is so obviously indicated by such assessments? This article describes the long and complex process that has made it possible to launch almost 200 interventions among the 3500 municipal bus drivers in Copenhagen. Using a participative action research design, new evidence was gathered by broadening the traditional work environmental scope to lifestyle, health issues and private matters. Comparing this updated needs assessment with a national reference population, it was found that drivers were often still worse off. Again, simply presenting new evidence did not seem to lead to changes and further work is needed to empower the stakeholders so that they can commit to start making effective interventions. It is concluded that every needs assessment has to be supplemented with an evaluation of the action potential.

  10. Ultra-clean Fischer-Tropsch (F-T) Fuels Production and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Stephen P. Bergin

    2006-06-30

    The objective of the DOE-NETL Fischer-Tropsch (F-T) Production and Demonstration Program was to produce and evaluate F-T fuel derived from domestic natural gas. The project had two primary phases: (1) fuel production of ultra-clean diesel transportation fuels from domestic fossil resources; and (2) demonstration and performance testing of these fuels in engines. The project also included a well-to-wheels economic analysis and a feasibility study of small-footprint F-T plants (SFPs) for remote locations such as rural Alaska. During the fuel production phase, ICRC partnered and cost-shared with Syntroleum Corporation to complete the mechanical design, construction, and operation of a modular SFP that converts natural gas, via F-T and hydro-processing reactions, into hydrogensaturated diesel fuel. Construction of the Tulsa, Oklahoma plant started in August 2002 and culminated in the production of over 100,000 gallons of F-T diesel fuel (S-2) through 2004, specifically for this project. That fuel formed the basis of extensive demonstrations and evaluations that followed. The ultra-clean F-T fuels produced had virtually no sulfur (less than 1 ppm) and were of the highest quality in terms of ignition quality, saturation content, backend volatility, etc. Lubricity concerns were investigated to verify that commercially available lubricity additive treatment would be adequate to protect fuel injection system components. In the fuel demonstration and testing phase, two separate bus fleets were utilized. The Washington DC Metropolitan Area Transit Authority (WMATA) and Denali National Park bus fleets were used because they represented nearly opposite ends of several spectra, including: climate, topography, engine load factor, mean distance between stops, and composition of normally used conventional diesel fuel. Fuel evaluations in addition to bus fleet demonstrations included: bus fleet emission measurements; F-T fuel cold weather performance; controlled engine dynamometer

  11. Design on CAN Network Project for Pure Electric Bus with Power Battery Replacement%换电式纯电动客车CAN网络方案设计

    Institute of Scientific and Technical Information of China (English)

    房永强

    2015-01-01

    结合某款换电式纯电动客车的研发与应用,介绍一种换电式纯电动客车三级CAN网络架构,以及合理的纯电动系统CAN总线管理方案。%Taking the R&D and application of a pure electric bus with the power battery replacement as an example, the author introduces a three-level CAN network architecture and appropriate management project of the control system based on the CAN bus of the pure electric system.

  12. Recycling and composting demonstration projects for the Memphis region

    Energy Technology Data Exchange (ETDEWEB)

    Muller, D. [Memphis and Shelby County Div. of Planning and Development, TN (United States)

    1992-05-01

    This report documents the development and implementation of the project entitled ``Recycling and Composting Demonstration Projects for the Memphis Region.`` The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  13. Recycling and composting demonstration projects for the Memphis region

    Energy Technology Data Exchange (ETDEWEB)

    Muller, D. (Memphis and Shelby County Div. of Planning and Development, TN (United States))

    1992-05-01

    This report documents the development and implementation of the project entitled Recycling and Composting Demonstration Projects for the Memphis Region.'' The project was funded by the Energy Task Force of the Urban Consortium for Technology Initiatives. This Project was implemented by the staff of the Special Programs Section of the Memphis and Shelby County Division of Planning and Development. The project began November 1, 1990, and was completed December 31, 1991. The purpose of the project was to evaluate the feasibility of a variety of solid waste disposal alternatives.

  14. Vitrification facility at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project`s vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project`s background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing.

  15. A demonstration project for smart grid started in Tianjin

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    On April 7, the construction of 110-kV Hechanglu intelligent substation in Tianjin Binhai New Area was started, inaugurating the comprehensive demonstration project for smart grid in Sino-Singapore Tianjin Eco-City.

  16. Nuclear Systems (NS): Technology Demonstration Unit (TDU) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Nuclear Systems Project demonstrates nuclear power technology readiness to support the goals of NASA’s Space Technology Mission Directorate. To this end,...

  17. Demonstration of Submillimeter Astrophysics Technology at Caltech Submillimeter Observatory Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The following are the objectives of this project:(1) Demonstration of 1600-element Kinetic Inductance Detector (KID) imaging array operating at 350 micron with near...

  18. Detroit Metropolitan Library Research and Demonstration Project. Background Data.

    Science.gov (United States)

    Kremer, Helen

    The Detroit Metropolitan Region, including six countries in southeastern Michigan, is the focus for the Detroit Metropolitan Library Research and Demonstration Project. This document provides background data on the region for the Project. Data included are (1) population, (2) educational facilities, (3) numbers of elementary and secondary pupils…

  19. Audi Duo demonstration project: environmental comparision and user survey

    NARCIS (Netherlands)

    Hendriksen, P.; Elst, D.A.M.M.; Riemersma, I.J.; Smokers, R.T.M.; Bosch, A. van den; Scheepers, M.; Arkel, W. van; Volkers, C.

    2000-01-01

    This paper describes the results and conclusions of a methodology for the assessment of environmental performance. This methodology was applied to a demonstration project conducted in the Netherlands with 10 Audi Duo parallel hybrid vehicles. During the course of the project, the vehicles were drive

  20. Application of Participatory Method to Selection of Project Demonstration Area

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    The Sino-Japan cooperation project of "Vegetation Rehabilitation Demonstration and Planning in Sandstorm Jeopardized Area around Beijing" introduced participatory method to select the project area. Through investigating the socioeconomic indicators of 9 villages in Beijing and Hebei Province as well as the farmers’ willingness to participate in forestry operation activities, the vegetation restoration demonstration areas were selected, including Hantai Village, Baicaowa Village and Xiabachi Village, respect...

  1. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  2. BMDO: New Mexico Technology Transfer Demonstration Project. Interim final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The BMDO-New Mexico Technology Transfer Demonstration Project(BMDO-NM) was a collaborative effort among the national laboratories to identify and evaluate the commercial potential of selected SDI-funded technologies. The project was funded by BMDO (formerly known as the Strategic Defense Initiative Office or SDIO), the Technology Enterprise Division (NM-TED) of the NM Economic Development Division, and the three National Laboratories. The project was managed and supervised by SAGE Management Partners of Albuquerque, and project funding was administered through the University of New Mexico. The BMDO-NM Demonstration Project focused on the development of a process to assist technology developers in the evaluation of selected BMDO technology programs so that commercialization decisions can be made in an accelerated manner. The project brought together BMDO, the NM-TED, the University of New Mexico, and three New Mexico Federal laboratories -- Los Alamos (DOE), Phillips (DOD) and Sandia (DOE). Each national laboratory actively participated throughout the project through its technology transfer offices. New Mexico was selected as the site for the Demonstration Program because of its three national and federal research laboratories engaged in BMDO programs, and the existing relationship among state govemment, the labs, universities and local economic development and business assistance organizations. Subsequent Commercialization and Implementation phases for the selected technologies from LANL and SNL were completed by SAGE and the Project Team. Funding for those phases was provided by the individual labs as well as BMDO and NM-TED in kind services. NM-TED played a proactive role in this New Mexico partnership. Its mandate is to promote technology-based economic development, with a commitment to facilitate the use of technology by industry and business statewide. TED assumed the role of program manager and executing agent for BMDO in this demonstration project.

  3. Milliken Clean Coal Demonstration Project: A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2001-08-15

    The goal of the U.S. Department of Energy's (DOE) Clean Coal Technology (CCT) program is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal-utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage.

  4. Final Report - Navajo Electrification Demonstration Project - FY2004

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  5. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C. [and others

    1997-01-15

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables.

  6. Global Inventory and Analysis of Smart Grid Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mulder, W.; Kumpavat, K.; Faasen, C.; Verheij, F.; Vaessen, P [DNV KEMA Energy and Sustainability, Arnhem (Netherlands)

    2012-10-15

    As the key enabler of a more sustainable, economical and reliable energy system, the development of smart grids has received a great deal of attention in recent times. In many countries around the world the benefits of such a system have begun to be investigated through a number of demonstration projects. With such a vast array of projects it can be difficult to keep track of changes, and to understand which best practices are currently available with regard to smart grids. This report aims to address these issues through providing a comprehensive outlook on the current status of smart grid projects worldwide.

  7. Residential Energy Efficiency Demonstration: Hawaii and Guam Energy Improvement Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Earle, L.; Sparn, B.; Rutter, A.; Briggs, D.

    2014-03-01

    In order to meet its energy goals, the Department of Defense (DOD) has partnered with the Department of Energy (DOE) to rapidly demonstrate and deploy cost-effective renewable energy and energy-efficiency technologies. The scope of this project was to demonstrate tools and technologies to reduce energy use in military housing, with particular emphasis on measuring and reducing loads related to consumer electronics (commonly referred to as 'plug loads'), hot water, and whole-house cooling.

  8. NRC assessment of the Department of Energy annealing demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, D.A.; Malik, S.N. [Nuclear Regulatory Commission, Washington, DC (United States)

    1997-02-01

    Thermal annealing is the only known method for mitigating the effects of neutron irradiation embrittlement in reactor pressure vessel (RPV) steels. In May 1996, the US Department of Energy (DOE) in conjunction with the American Society of Mechanical Engineers, Westinghouse, Cooperheat, Electric Power Research Institute (with participating utilities), Westinghouse Owner`s Group, Consumers Power, Electricite` de France, Duquesne Light and the Central Research Institute of the Electric Power Industry (Japan) sponsored an annealing demonstration project (ADP) at Marble Hill. The Marble Hill Plant, located in Madison, Indiana, is a Westinghouse 4 loop design. The plant was nearly 70% completed when the project was canceled. Hence, the RPV was never irradiated. The paper will present highlights from the NRCs independent evaluation of the Marble Hill Annealing Demonstration Project.

  9. West Valley Demonstration Project: Public information plan: Objectives, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, W. D.

    1987-09-30

    This report describes the objectives and proposed activities of the public information program. Included are statements of purpose, goals, approach, and methods of implementation. This office deals with local, state, and federal agencies to inform them on the status of this demonstration project. (TEM)

  10. Project to demonstrate key technologies for native medicines

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    @@ Aresearch project on the demonstration of key technologies for developing medicines and pharmacy of Chinese minorities will soon be started at the CAS Northwest Institute of Plateau Biology (NWIPB). From 3 to 5 November, 2008, a forum to appraise its implementation approaches was held in Xining, capital of northwest China's Qinghai Province.

  11. McIntosh Unit 4 PCFB demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, A.M. [Lakeland Electric and Water, FL (United States); Dryden, R.J. [Foster Wheeler Development Corp., San Diego, CA (United States); Morehead, H.T. [Westinghouse Electric Corp., Orlando, FL (United States)

    1997-12-31

    The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured into three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.

  12. Analysis of robustness of urban bus network

    Science.gov (United States)

    Tao, Ren; Yi-Fan, Wang; Miao-Miao, Liu; Yan-Jie, Xu

    2016-02-01

    In this paper, the invulnerability and cascade failures are discussed for the urban bus network. Firstly, three static models(bus stop network, bus transfer network, and bus line network) are used to analyse the structure and invulnerability of urban bus network in order to understand the features of bus network comprehensively. Secondly, a new way is proposed to study the invulnerability of urban bus network by modelling two layered networks, i.e., the bus stop-line network and the bus line-transfer network and then the interactions between different models are analysed. Finally, by modelling a new layered network which can reflect the dynamic passenger flows, the cascade failures are discussed. Then a new load redistribution method is proposed to study the robustness of dynamic traffic. In this paper, the bus network of Shenyang City which is one of the biggest cities in China, is taken as a simulation example. In addition, some suggestions are given to improve the urban bus network and provide emergency strategies when traffic congestion occurs according to the numerical simulation results. Project supported by the National Natural Science Foundation of China (Grant Nos. 61473073, 61374178, 61104074, and 61203329), the Fundamental Research Funds for the Central Universities (Grant Nos. N130417006, L1517004), and the Program for Liaoning Excellent Talents in University (Grant No. LJQ2014028).

  13. FINDING SOLUTIONS AT THE WEST VALLEY DEMONSTRATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Drake, John L.; Gramling, James M.; Houston, Helene M.

    2003-02-27

    The United States Department of Energy Office of Environmental Management (DOE-EM) faces a number of sizeable challenges as it begins to transform its mission from managing risk to reducing and eliminating risk throughout the DOE Complex. One of the greatest challenges being addressed by DOE-EM as this transformation takes place is accelerating the deactivation and decommissioning of thousands of facilities within the DOE Complex that were once used to support nuclear-related programs and projects. These facilities are now unused and aging. Finding solutions to complete the cleanup of these aging facilities more safely, efficiently, and effectively while reducing costs is critical to successfully meeting DOE-EM's cleanup challenge. The Large-Scale Demonstration and Deployment Project (LSDDP) of Hot Cells at the West Valley Demonstration Project (WVDP) is a near-term project funded through the DOE's National Energy Technology Laboratory (DOE-NETL) for the specific purpose of identifying, evaluating, demonstrating, and deploying commercially available technologies that are capable of streamlining the cleanup of hot cells in unused facilities while improving worker safety. Two DOE project sites are participating in this LSDDP: the WVDP site in West Valley, New York and the Hanford River Corridor Project (RCP) site in Richland, Washington. The WVDP site serves as the host site for the project. Technologies considered for demonstration and potential deployment at both LSDDP sites are targeted for application in hot cells that require the use of remote and semi-remote techniques to conduct various cleanup-related activities because of high radiation or high contamination levels. These hot cells, the type of cleanup activities being conducted, and technologies selected for demonstration are the main topics discussed in this paper. The range of cleanup-related activities addressed include in-situ characterization, size-reduction, contamination control

  14. Cummins Engine Company B5.9 Propane Engine Development, Certification, and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    The ADEPT Group, Inc. (Los Angeles, California)

    1998-12-18

    The objective of this project was to successfuly develop and certify an LPG-dedicated medium-duty original equipment manufacturer (OEM) engine that could be put into production. The engine was launched into production in 1994, and more than 800 B5.9G engines are now in service in the United States and abroad. This engine is now offered by more than 30 bus and truck OEMs.

  15. Expedited technology demonstration project final report: final forms

    Energy Technology Data Exchange (ETDEWEB)

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  16. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    Stottler, Gary

    2012-02-08

    General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

  17. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1990 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The objective of this DOE Cooperative Agreement is to conduct a cost-shared clean coal technology project to demonstrate the feasibility of circulating fluidized bed combustion technology and to evaluate economic, environmental, and operational benefits of CFB steam generators on a utility scale. At the conclusion of the Phase 2 program, testing related to satisfying these objectives was completed. Data analysis and reporting are scheduled for completion by October 1991. (VC)

  18. Staunton 1 Reclamation Demonstration Project. Progress report for 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process for a deep coal mine refuse system. A typical abandoned midwestern deep coal mine refuse site was selected, final land use was determined, baseline data were collected, engineering plans were developed and implemented, and a post-construction evaluation was begun. The project is a cooperative effort by two state agencies--the Abandoned Mined Land Reclamation Council of Illinois the Illinois Institute for Environmental Quality--and the U.S. Department of Energy through the Land Reclamation Program at Argonne National Laboratory. Current investigations are monitoring groundwater, surface water quality, aquatic ecosystems, revegetation, soil characteristics, erosion and runoff, soil microbial and soil fauna populations, wildlife, and economic effects of the reclamation effort. The research is a multidisciplinary approach to the concept of ecosystem response to reclamation.

  19. Diesel fueled ship propulsion fuel cell demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Kumm, W.H. [Arctic Energies Ltd., Severna Park, MD (United States)

    1996-12-31

    The paper describes the work underway to adapt a former US Navy diesel electric drive ship as a 2.4 Megawatt fuel cell powered, US Coast Guard operated, demonstrator. The Project will design the new configuration, and then remove the four 600 kW diesel electric generators and auxiliaries. It will design, build and install fourteen or more nominal 180 kW diesel fueled molten carbonate internal reforming direct fuel cells (DFCs). The USCG cutter VINDICATOR has been chosen. The adaptation will be carried out at the USCG shipyard at Curtis Bay, MD. A multi-agency (state and federal) cooperative project is now underway. The USCG prime contractor, AEL, is performing the work under a Phase III Small Business Innovation Research (SBIR) award. This follows their successful completion of Phases I and II under contract to the US Naval Sea Systems (NAVSEA) from 1989 through 1993 which successfully demonstrated the feasibility of diesel fueled DFCs. The demonstrated marine propulsion of a USCG cutter will lead to commercial, naval ship and submarine applications as well as on-land applications such as diesel fueled locomotives.

  20. North Village Ground Source Heat Pump Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Redderson, Jeff

    2015-08-03

    This project demonstrated the feasibility of converting from a traditional direct exchange system to a ground source heat pump system on a large scale, multiple building apartment complex on a university campus. A total of ten apartment buildings were converted using vertical well fields and a ground source loop that connected the 24 apartments in each building into a common system. The system has yielded significant operational savings in both energy and maintenance and transformed the living environments of these residential buildings for our students.

  1. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  2. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  3. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  4. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  5. Wood to Bio-Methane demonstration project in the Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Van der Meijden, C.M.; Van der Drift, A.; Rietveld, G. [ECN Biomass and Energy Efficiency, Petten (Netherlands); Koenemann, J.W. [Dahlman Renewable Technology, P.O. Box 438, 3140 AK Maassluis (Netherlands); Sierhuis, W. [HVCgroup, P.O. Box 9199, 1800 GD, Alkmaar (Netherlands)

    2013-06-15

    The Energy research Centre of the Netherlands (ECN) has developed a biomass gasification technology, called the MILENA technology. The Milena gasification technology has a high cold gas efficiency and high methane yield, making it very suitable for gas engine and turbine applications as well as upgrading of the gas into Bio-Methane. An overall efficiency from biomass to power of over 30% is possible, whereas 70% efficiency is achievable from biomass to gas grid quality methane. HVC Group (situated in Alkmaar, North Holland) is a modern public service waste company. HVC converts waste streams which cannot be recycled into usable forms of energy. HVC has a 75 MWth waste wood boiler in operation which produces heat and electricity, and an anaerobic digester which converts domestic fruit, vegetable and garden waste into Bio-Methane. HVC expects an important role for Bio-Methane in the future and HVC has decided to join ECN with the development, demonstration and implementation of the MILENA Bio-Methane technology. Linked to the Bio-Methane demonstration project is the Netherlands Expertise Centre for Biomass Gasification. The MILENA demonstration project and the Gasification Expert Centre are supported by the following companies and organizations: HVC, TAQA, Gasunie, Dahlman, province of North Holland, the Alkmaar municipality and ECN. In 2010 and 2012 extensive lab-scale and pilot scale tests have been executed by ECN and HVC to proof that the gasification and gas cleaning technology is ready for commercial application. The final step in this test program was a duration test in the 800 kWth MILENA pilot plant coupled to the OLGA tar removal unit. The goal was to show high availability. The result of the test was an availability of the gasifier of 96% and an overall availability (including gas cooling and gas cleaning) of 85%. The results of the duration tests convinced HVC and the other partners that the technology is ready for scale-up. The results produced in the

  6. The Advanced Linked Extended Reconnaissance & Targeting Technology Demonstration project

    Science.gov (United States)

    Edwards, Mark

    2008-04-01

    The Advanced Linked Extended Reconnaissance & Targeting (ALERT) Technology Demonstration (TD) project is addressing many operational needs of the future Canadian Army's Surveillance and Reconnaissance forces. Using the surveillance system of the Coyote reconnaissance vehicle as an experimental platform, the ALERT TD project aims to significantly enhance situational awareness by fusing multi-sensor and tactical data, developing automated processes, and integrating beyond line-of-sight sensing. The project is exploiting important advances made in computer processing capability, displays technology, digital communications, and sensor technology since the design of the original surveillance system. As the major research area within the project, concepts are discussed for displaying and fusing multi-sensor and tactical data within an Enhanced Operator Control Station (EOCS). The sensor data can originate from the Coyote's own visible-band and IR cameras, laser rangefinder, and ground-surveillance radar, as well as from beyond line-of-sight systems such as mini-UAVs and unattended ground sensors. Video-rate image processing has been developed to assist the operator to detect poorly visible targets. As a second major area of research, automatic target cueing capabilities have been added to the system. These include scene change detection, automatic target detection and aided target recognition algorithms processing both IR and visible-band images to draw the operator's attention to possible targets. The merits of incorporating scene change detection algorithms are also discussed. In the area of multi-sensor data fusion, up to Joint Defence Labs level 2 has been demonstrated. The human factors engineering aspects of the user interface in this complex environment are presented, drawing upon multiple user group sessions with military surveillance system operators. The paper concludes with Lessons Learned from the project. The ALERT system has been used in a number of C4ISR

  7. 75 FR 53075 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2010-08-30

    ... Defense Science and Technology Reinvention Laboratory Personnel Management Demonstration Project... Science and Technology Reinvention Laboratory Personnel Management Demonstration Project, Department of... Personnel Demonstration Project to AFRL employees in Business Management and Professional, Technician,...

  8. The Social Security Administration's Youth Transition Demonstration Projects: Implementation Lessons from the Original Projects

    Science.gov (United States)

    Martinez, John; Fraker, Thomas; Manno, Michelle; Baird, Peter; Mamun, Arif; O'Day, Bonnie; Rangarajan, Anu; Wittenburg, David

    2010-01-01

    This report focuses on the seven original Youth Transition Demonstration (YTD) projects selected for funding in 2003. Three of the original seven projects were selected for a national random assignment evaluation in 2005; however, this report only focuses on program operations prior to joining the random assignment evaluation for the three…

  9. Ultra Low Sulfur Home Heating Oil Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Batey, John E. [Energy Research Center, Inc., Easton, CT (United States); McDonald, Roger [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-09-30

    This Ultra Low Sulfur (ULS) Home Heating Oil Demonstration Project was funded by the New York State Energy Research and Development Authority (NYSERDA) and has successfully quantified the environmental and economic benefits of switching to ULS (15 PPM sulfur) heating oil. It advances a prior field study of Low Sulfur (500 ppm sulfur) heating oil funded by NYSERDA and laboratory research conducted by Brookhaven National Laboratory (BNL) and Canadian researchers. The sulfur oxide and particulate matter (PM) emissions are greatly reduced as are boiler cleaning costs through extending cleaning intervals. Both the sulfur oxide and PM emission rates are directly related to the fuel oil sulfur content. The sulfur oxide and PM emission rates approach near-zero levels by switching heating equipment to ULS fuel oil, and these emissions become comparable to heating equipment fired by natural gas. This demonstration project included an in-depth review and analysis of service records for both the ULS and control groups to determine any difference in the service needs for the two groups. The detailed service records for both groups were collected and analyzed and the results were entered into two spreadsheets that enabled a quantitative side-by-side comparison of equipment service for the entire duration of the ULS test project. The service frequency for the ULS and control group were very similar and did indicate increased service frequency for the ULS group. In fact, the service frequency with the ULS group was slightly less (7.5 percent) than the control group. The only exception was that three burner fuel pump required replacement for the ULS group and none were required for the control group.

  10. 客车品牌整合营销传播中的项目管理应用研究%Application Research of Project Management to Integration Marketing Communication for Bus / Coach Brand

    Institute of Scientific and Technical Information of China (English)

    何树昌

    2012-01-01

    将项目管理的思想引入到客车行业的品牌整合营销传播之中,重点分析研究客车品牌整合传播中的进度控制和成本管理,以提高客车品牌营销的管理水平和传播效果。%The author introduces the ideas of project management to the brand integration marketing commumication in the bus / coach industry, mainly analyse the progress control and cost management of the bus / coach brand integration of communication in building bus brand dissemination mode of project management, it promotes the level of project management and communication effect.

  11. AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

    2014-02-01

    This report contributes initial findings from an analysis of significant aspects of the gridSMART® Real-Time Pricing (RTP) – Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

  12. Geothermal project summaries. Geothermal energy research, development, and demonstration program

    Energy Technology Data Exchange (ETDEWEB)

    1976-04-01

    The Division of Geothermal Energy ''Geothermal Project Summaries'' provides pertinent information on each active ERDA Geothermal project, includes a listing of all contractors and a compilation of completed projects. New project summaries and necessary revisions to current project data will be prepared on a quarterly basis.

  13. Northwest Open Automated Demand Response Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Kiliccote, Sila; Piette, Mary Ann; Dudley, Junqiao

    2010-03-17

    The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also

  14. Texas LPG fuel cell development and demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units

  15. Construction Cost Analysis : Residential Construction Demonstration Project Cycle II.

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, Cole; Thor, Philip W.

    1990-06-01

    The Residential Construction Demonstration Project (RCDP) is designed to demonstrate new residential building techniques and product innovations which advance the stage-of-the-art in constructing energy-efficient electrically heated residences. A secondary purpose is to obtain documented cost and energy savings data from which to make accurate assessments of the cost-effectiveness of various conservation innovations. The project solicits participation of regional homebuilders by offering them financial incentives for constructing homes to the Model Conservation Standards (MCS) and including at least one innovation.'' The innovations are determined by BPA and the States prior to construction and represent construction techniques or energy saving products that might reduce the cost of building MCS homes, or expand the options available to builders in achieving MCS levels of energy efficiency in homes. Besides covering some of the additional risk for employing the innovation, the incentive payment guarantees that builders will provide certain amounts of information regarding the cost and acceptability of building the homes. In addition, an incentive is paid to homeowners for their participation in data collection efforts following construction. Several one-time'' tests were performed on the houses and homeowners were required to report energy consumption and temperature data on a weekly basis for approximately 18 months. BPA and the States compile the information obtained from the builders and homeowners. Access to this data is provided for the purpose of analyzing the cost and performance of the RCDP homes, as well as understanding the value of the various innovations that are tested. 25 tabs., 4 figs.

  16. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project, A DOE Assessment

    Energy Technology Data Exchange (ETDEWEB)

    National Energy Technology Laboratory

    2001-08-31

    The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO{sub 2} emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO{sub 2} removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were required; (3) direct injection of pulverized limestone into the absorber was successful; (4) Wastewater evaporation eliminated the need for liquid waste disposal; and (5) the gypsum by-product was used directly for wallboard manufacture, eliminating the need to dispose of waste sludge.

  17. Locomotive Emission and Engine Idle Reduction Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    John R. Archer

    2005-03-14

    In response to a United States Department of Energy (DOE) solicitation, the Maryland Energy Administration (MEA), in partnership with CSX Transportation, Inc. (CSXT), submitted a proposal to DOE to support the demonstration of Auxiliary Power Unit (APU) technology on fifty-six CSXT locomotives. The project purpose was to demonstrate the idle fuel savings, the Nitrous Oxide (NOX) emissions reduction and the noise reduction capabilities of the APU. Fifty-six CSXT Baltimore Division locomotives were equipped with APUs, Engine Run Managers (ERM) and communications equipment to permit GPS tracking and data collection from the locomotives. Throughout the report there is mention of the percent time spent in the State of Maryland. The fifty-six locomotives spent most of their time inside the borders of Maryland and some spent all their time inside the state borders. Usually when a locomotive traveled beyond the Maryland State border it was into an adjoining state. They were divided into four groups according to assignment: (1) Power Unit/Switcher Mate units, (2) Remote Control units, (3) SD50 Pusher units and (4) Other units. The primary data of interest were idle data plus the status of the locomotive--stationary or moving. Also collected were main engine off, idling or working. Idle data were collected by county location, by locomotive status (stationary or moving) and type of idle (Idle 1, main engine idling, APU off; Idle 2, main engine off, APU on; Idle 3, main engine off, APU off; Idle 4, main engine idle, APU on). Desirable main engine idle states are main engine off and APU off or main engine off and APU on. Measuring the time the main engine spends in these desirable states versus the total time it could spend in an engine idling state allows the calculation of Percent Idle Management Effectiveness (%IME). IME is the result of the operation of the APU plus the implementation of CSXT's Warm Weather Shutdown Policy. It is difficult to separate the two. The

  18. INTEGRATED GASIFICATION COMBINED CYCLE PROJECT 2 MW FUEL CELL DEMONSTRATION

    Energy Technology Data Exchange (ETDEWEB)

    FuelCell Energy

    2005-05-16

    With about 50% of power generation in the United States derived from coal and projections indicating that coal will continue to be the primary fuel for power generation in the next two decades, the Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCTDP) has been conducted since 1985 to develop innovative, environmentally friendly processes for the world energy market place. The 2 MW Fuel Cell Demonstration was part of the Kentucky Pioneer Energy (KPE) Integrated Gasification Combined Cycle (IGCC) project selected by DOE under Round Five of the Clean Coal Technology Demonstration Program. The participant in the CCTDP V Project was Kentucky Pioneer Energy for the IGCC plant. FuelCell Energy, Inc. (FCE), under subcontract to KPE, was responsible for the design, construction and operation of the 2 MW fuel cell power plant. Duke Fluor Daniel provided engineering design and procurement support for the balance-of-plant skids. Colt Engineering Corporation provided engineering design, fabrication and procurement of the syngas processing skids. Jacobs Applied Technology provided the fabrication of the fuel cell module vessels. Wabash River Energy Ltd (WREL) provided the test site. The 2 MW fuel cell power plant utilizes FuelCell Energy's Direct Fuel Cell (DFC) technology, which is based on the internally reforming carbonate fuel cell. This plant is capable of operating on coal-derived syngas as well as natural gas. Prior testing (1992) of a subscale 20 kW carbonate fuel cell stack at the Louisiana Gasification Technology Inc. (LGTI) site using the Dow/Destec gasification plant indicated that operation on coal derived gas provided normal performance and stable operation. Duke Fluor Daniel and FuelCell Energy developed a commercial plant design for the 2 MW fuel cell. The plant was designed to be modular, factory assembled and truck shippable to the site. Five balance-of-plant skids incorporating fuel processing, anode gas oxidation, heat recovery

  19. LOW SULFUR HOME HEATING OIL DEMONSTRATION PROJECT SUMMARY REPORT.

    Energy Technology Data Exchange (ETDEWEB)

    BATEY, J.E.; MCDONALD, R.J.

    2005-06-01

    This project was funded by NYSERDA and has clearly demonstrated many advantages of using low sulfur content heating oil to provide thermal comfort in homes. Prior laboratory research in the United States and Canada had indicated a number of potential benefits of using lower sulfur (0.05%) heating oil. However, this prior research has not resulted in the widespread use of low sulfur fuel oil in the marketplace. The research project described in this report was conducted with the assistance of a well-established fuel oil marketer in New York State (NYS) and has provided clear proof of the many real-world advantages of marketing and using low sulfur content No. 2 fuel oil. The very positive experience of the participating marketer over the past three years has already helped to establish low sulfur heating oil as a viable option for many other fuel marketers. In large part, based on the initial findings of this project and the experience of the participating NYS oilheat marketer, the National Oilheat Research Alliance (NORA) has already fully supported a resolution calling for the voluntary use of low sulfur (0.05 percent) home heating oil nationwide. The NORA resolution has the goal of converting eighty percent of all oil-heated homes to the lower sulfur fuel (0.05 percent by weight) by the year 2007. The Oilheat Manufacturers Association (OMA) has also passed a resolution fully supporting the use of lower sulfur home heating oil in the equipment they manufacture. These are important endorsements by prominent national oil heat associations. Using lower sulfur heating oil substantially lowers boiler and furnace fouling rates. Laboratory studies had indicated an almost linear relationship between sulfur content in the oil and fouling rates. The completed NYSERDA project has verified past laboratory studies in over 1,000 occupied residential homes over the course of three heating seasons. In fact, the reduction in fouling rates so clearly demonstrated by this project is

  20. Geothermal project summaries. Geothermal energy research, development and demonstration program

    Energy Technology Data Exchange (ETDEWEB)

    1976-09-01

    Summaries of all Division of Geothermal Energy supported projects for which contracts have been executed are compiled. Each summary includes pertinent statistical data for that project and an abstract summarizing the project plans and accomplishments. The projects summarized fall into six categories: engineering research and development, resource exploration and assessment, hydrothermal technology applications, advanced technology applications, utilization experiments, and environmental control and institutional studies. (MHR)

  1. Staunton 1 Reclamation Demonstration Project. Progress report II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process on a 13.8-ha abandoned deep coal mine refuse site in southwestern Illinois. The procedure included collection of preconstruction environmental data, determination of the site's final land use, and development and implementation of a detailed site development plan. Approximately 9.3 ha of refuse material was recontoured, covered with a minimum of 30 cm of soil obtained on site, and seeded with a mixture of grasses and legumes. Hydrologic investigation indicates some improvement in groundwater quality. Surface water quality also has shown improvement, but development of the aquatic ecosystem in the newly-constructed pond is slow. Revegetation has been successful, and a protective plant cover has been established on most areas of the site. Soil tests indicate that acceptable plant growth media have been constructed; however, continued application of fertilizer and limestone will probably be necessary to maintain the vegetation. The soil microbial community has achieved total numbers equal to those of old fields, but species' diversity is low. Small mammals, birds, reptiles, and amphibians have invaded and are utilizing the site. The economic value of the site and adjacent property has increased substantially, and the area's aesthetic value has been enhanced significantly. The two-year period of intensive monitoring and evaluation has been utilized to develop recommendations for improving the designs of future reclamation efforts.

  2. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  3. 78 FR 78342 - Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...

    Science.gov (United States)

    2013-12-26

    ... of the Secretary Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under... Access to Autism Services Demonstration Project (Autism Demonstration) under the Extended Care Health Option (ECHO) for beneficiaries diagnosed with an Autism Spectrum Disorder (ASD). Under the...

  4. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15

  5. Gas Dynamic Spray Technology Demonstration Project Management. Joint Test Report

    Science.gov (United States)

    Lewis, Pattie

    2011-01-01

    The standard practice for protecting metallic substrates in atmospheric environments is the use of an applied coating system. Current coating systems used across AFSPC and NASA contain volatile organic compounds (VOCs) and hazardous air pollutants (HAPs). These coatings are sUbject to environmental regulations at the Federal and State levels that limit their usage. In addition, these coatings often cannot withstand the high temperatures and exhaust that may be experienced by Air Force Space Command (AFSPC) and NASA structures. In response to these concerns, AFSPC and NASA have approved the use of thermal spray coatings (TSCs). Thermal spray coatings are extremely durable and environmentally friendly coating alternatives, but utilize large cumbersome equipment for application that make the coatings difficult and time consuming to repair. Other concerns include difficulties coating complex geometries and the cost of equipment, training, and materials. Gas Dynamic Spray (GOS) technology (also known as Cold Spray) was evaluated as a smaller, more maneuverable repair method as well as for areas where thermal spray techniques are not as effective. The technology can result in reduced maintenance and thus reduced hazardous materials/wastes associated with current processes. Thermal spray and GOS coatings also have no VOCs and are environmentally preferable coatings. The primary objective of this effort was to demonstrate GDS technology as a repair method for TSCs. The aim was that successful completion of this project would result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations to improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

  6. Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    D' Annunzio, Julie [Ford Motor Company, Dearborn, MI (United States); Slezak, Lee [U.S. DOE Office of Energy Efficiency & Renewable Energy, Washington, DC (United States); Conley, John Jason [National Energy Technology Lab. (NETL), Albany, OR (United States)

    2014-03-26

    This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.

  7. Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-12-31

    This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.

  8. HARD CHROME POLLUTION PREVENTION DEMONSTRATION PROJECT - INTERIM REPORT

    Science.gov (United States)

    In the project, five chromium emission prevention/control devices were tested tha cover the spectrum of prevention/control techniques currently in use in small- and large-size hard chromium electroplating job shops. The Project results show that some of the tested devices had ch...

  9. Northwest Open Automated Demand Response Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann

    2009-08-01

    Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) performed a technology demonstration and evaluation for Bonneville Power Administration (BPA) in Seattle City Light's (SCL) service territory. This report summarizes the process and results of deploying open automated demand response (OpenADR) in Seattle area with winter morning peaking commercial buildings. The field tests were designed to evaluate the feasibility of deploying fully automated demand response (DR) in four to six sites in the winter and the savings from various building systems. The project started in November of 2008 and lasted 6 months. The methodology for the study included site recruitment, control strategy development, automation system deployment and enhancements, and evaluation of sites participation in DR test events. LBNL subcontracted McKinstry and Akuacom for this project. McKinstry assisted with recruitment, site survey collection, strategy development and overall participant and control vendor management. Akuacom established a new server and enhanced its operations to allow for scheduling winter morning day-of and day-ahead events. Each site signed a Memorandum of Agreement with SCL. SCL offered each site $3,000 for agreeing to participate in the study and an additional $1,000 for each event they participated. Each facility and their control vendor worked with LBNL and McKinstry to select and implement control strategies for DR and developed their automation based on the existing Internet connectivity and building control system. Once the DR strategies were programmed, McKinstry commissioned them before actual test events. McKinstry worked with LBNL to identify control points that can be archived at each facility. For each site LBNL collected meter data and trend logs from the energy management and control system. The communication system allowed the sites to receive day-ahead as well as day-of DR test event signals. Measurement of DR was

  10. SNOX demonstration project: Volume 2, Project performance and economics. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    The SNOX process, developed by Haldor Topsoe A/S and demonstrated and marketed in North America by ABB Environmental Systems (ABBES), is an innovative process which removes both sulfur dioxide and nitrogen oxides from power plant flue gases. Sulfur dioxide is recovered as high purity, concentrated sulfuric acid and nitrogen oxides are converted to nitrogen gas and water vapor; no additional waste streams are produced. As part of the Clean Coal Technology Program, this project was demonstrated under joint sponsorship from the US Department of Energy, Ohio Coal Development Office, ABBES, Snamprogetti, and Ohio Edison. The project objective was to demonstrate the SO{sub 2}/NO{sub x} reduction efficiencies of the SNOX process on an electric power plant firing high-sulfur Ohio Coal. A 35-MWe demonstration has been conducted on a 108-MWe unit, Ohio Edison`s Niles Plant Unit 2, in Trumbull County, Ohio. The $31.4 million project began site preparation in November 1990 and commenced treating flue gas in March of 1992. A parametric test program has been completed. This report presents a description of the technology, results from the 33 month testing and operation phase, and information from a commercial scale economic evaluation. During the demonstration, the process met or exceeded its design goals of 95% SO{sub 2} removal, 90% NO{sub x} removal, and production of commercial grade (>93.2 wt.%) sulfuric acid. The plant was operated for approximately 8000 hours and produced more than 5600 tons of acid, which was purchased and distributed by a local supplier to end users. Projected economics for a 500 MWe commercial SNOX plant indicate a total capital requirement of 305 $/kW, levelized incremental cost of power at 6.1 mills/kWh, 219 $/ton of SO{sub 2} removed, and 198 $/ton of SO{sub 2}+NO{sub x} removed (all at constant dollars).

  11. Next Steps for the FCEV Learning Demonstration Project (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-02-01

    This presentation summarizes project goals; vehicle and H2 station deployment status, critical performance compared to targets; highlights of latest vehicle and infrastructure analysis results and progress; learning demo next steps; highlights of partner activities and summary.

  12. Demonstration Project of Radioactive Solid Waste Retrieval and Conditioning

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>The construction goal of the project is to construct a set of special equipments for radioactive solid waste retrieval, sorting, pre-compacting and radioactive measurement, to provide a set of engineering

  13. Picosats for Autonomous Rendezvous and Docking Technology Demonstration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Over the next decade, a host of new technologies and capabilities will be needed by NASA to support Project Constellation. For risk reduction considerations, it is...

  14. Safety evaluation of a hydrogen fueled transit bus

    Energy Technology Data Exchange (ETDEWEB)

    Coutts, D.A.; Thomas, J.K.; Hovis, G.L.; Wu, T.T. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1997-12-31

    Hydrogen fueled vehicle demonstration projects must satisfy management and regulator safety expectations. This is often accomplished using hazard and safety analyses. Such an analysis has been completed to evaluate the safety of the H2Fuel bus to be operated in Augusta, Georgia. The evaluation methods and criteria used reflect the Department of Energy`s graded approach for qualifying and documenting nuclear and chemical facility safety. The work focused on the storage and distribution of hydrogen as the bus motor fuel with emphases on the technical and operational aspects of using metal hydride beds to store hydrogen. The safety evaluation demonstrated that the operation of the H2Fuel bus represents a moderate risk. This is the same risk level determined for operation of conventionally powered transit buses in the United States. By the same criteria, private passenger automobile travel in the United States is considered a high risk. The evaluation also identified several design and operational modifications that resulted in improved safety, operability, and reliability. The hazard assessment methodology used in this project has widespread applicability to other innovative operations and systems, and the techniques can serve as a template for other similar projects.

  15. Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-03-01

    Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  17. 78 FR 64204 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2013-10-28

    ... published a notice of approval of a personnel management demonstration project for eligible ONR employees... of the Secretary Science and Technology Reinvention Laboratory Personnel Management Demonstration Project, Department of Navy, Office of Naval Research (ONR); Amendment and Corrections AGENCY:...

  18. 76 FR 12507 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2011-03-07

    ... Secretary Science and Technology Reinvention Laboratory Personnel Management Demonstration Project... monitor the fair, equitable, and consistent implementation of the provisions of the demonstration project... March 7, 2011 Part III Department of Defense Science and Technology Reinvention Laboratory...

  19. 78 FR 29335 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects

    Science.gov (United States)

    2013-05-20

    ... Management, AMRDEC, 5400 Fowler Road, Redstone Arsenal, AL 35898-5000; ERDC: Personnel Demonstration Project... of the Secretary Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense (Civilian Personnel...

  20. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  1. Urban Options Solar Greenhouse Demonstration Project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  2. OCTAVIUS: a FP7 project demonstrating CO2 capture technologies

    NARCIS (Netherlands)

    Broutin, P.; Kvamsdal, H.M.; La Marca, C.; Os, P.J. van; Robinson, L.

    2014-01-01

    The OCTAVIUS project (Optimisation of CO2 Capture Technology Allowing Verification and Implementation at Utility Scale) has started on March 1st 2012 for a period of 5 years, as part of the 7th Framework Programme of the European Commission. Gathering 15 European and 2 South African partners, OCTAVI

  3. Demonstrational Features of the Tuskegee Institute Retraining Project, Volume I.

    Science.gov (United States)

    Tuskegee Inst., AL.

    This 52-week Tuskegee Institute project, undertaken in 1964 to train a sample of culturally deprived male heads of households in Alabama, included vocational skills (brickmasonry, carpentry, farm machinery, and meat processing), academic skills (mathematics, English, and remedial reading), group, individual, and family counseling, medical care,…

  4. Four Thruster Microfluidic Electrospray Propulsion (MEP) Cubesat Board Demonstration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Cubesat Microfluidic Electrospray Propulsion (MEP) system module prototype will be designed, built and tested to demonstrate that a four MEP thruster system can...

  5. MPED: An ISRU Bucket Ladder Excavator Demonstrator System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is a planetary surface tool called the Multi Purpose Excavation Demonstrator (MPED), which is intended to both extract Lunar Soil to feed an...

  6. Plastic Melt Waste Compactor Flight Demonstrator Payload (PFDP) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The PMWC Flight Demonstrator Payload is a trash dewatering and volume reduction system that uses heat melt compaction to remove nearly 100% of water from trash while...

  7. Combined HSRL and Optical Autocovarience Wind Lidar (HOAWL) Demonstration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Demonstrate 2β + 2α + 2δ High Spectral Resolution Lidar (HSRL) and Doppler wind lidar measurements simultaneously at 355nm and 532nm using a single...

  8. MPED: An ISRU Bucket Ladder Excavator Demonstrator System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Abstract: The Multi-Purpose Excavation Demonstrator (MPED) is a commercial effort and a third generation of technology, following Bucket Wheel Excavator and Bucket...

  9. PCI bus demystified

    CERN Document Server

    Abbott, Doug

    2004-01-01

    The peripheral component interconnect (PCI) bus is the dominant bus system used to connect the different elements making up today''s high-performance computer systems. Different PCI implementations have also been developed for such applications as telecommunications and embedded computing. If an application calls for high speed, high reliability, flexible configuration, and bus mastering, then PCI is the only logical bus choice. This book is an applications-oriented introduction to the PCI bus, with an emphasis on implementing PCI in a variety of computer architectures. Special attention is given to industrial and mission-critical applications of PCI bus.·Fully describes PCI electrical specifications, mechanical requirements, and signal types·Covers advanced topics through numerous design examples to increase the readers understanding of the subject ·Includes updated coverage of PCI-X 2.0

  10. Solar demonstration project in a fast-food restaurant

    Energy Technology Data Exchange (ETDEWEB)

    McClenahan, D.

    1980-11-01

    Results are given of a two-phase program in which the first phase included the successful use of heat reclamation equipment and energy conservation techniques at a typical fast-food restaurant. The project's second phase involved the engineering, designing, installation and interfacing of a solar collector system at the facility. The report will help to serve as a guide for other restaurants around the state, and possibly the nation, which wish to install energy saving systems, or adopt energy-saving techniques, geared to their special needs and equipment.

  11. Regenerative polymeric bus architecture for board-level optical interconnects.

    Science.gov (United States)

    Bamiedakis, N; Hashim, A; Penty, R V; White, I H

    2012-05-21

    A scalable multi-channel optical regenerative bus architecture based on the use of polymer waveguides is presented for the first time. The architecture offers high-speed interconnection between electrical cards allowing regenerative bus extension with multiple segments and therefore connection of an arbitrary number of cards onto the bus. In a proof-of-principle demonstration, a 4-channel 3-card polymeric bus module is designed and fabricated on standard FR4 substrates. Low insertion losses (≤ -15 dB) and low crosstalk values (bus modules using a prototype 3R regenerator.

  12. Green River Formation water flood demonstration project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Pennington, B.I.; Dyer, J.E.; Lomax, J.D. [Inland Resources, Inc. (United States)]|[Lomax Exploration Co., Salt Lake City, UT (United States); Deo, M.D. [Utah Univ., Salt Lake City, UT (United States). Dept. of Chemical and Fuels Engineering

    1996-11-01

    The objectives of the project were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter core, Formation Micro Imaging (FMI) logs from several wells and Magnetic Resonance Imaging (MRI) logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using high-temperature gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2,000 barrels per day.

  13. SRC-I Project Baseline. [SRC-I demonstration project near Owensboro, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-03-01

    The Process Design Criteria Specification forms the basis for process design for the 6000-TPSD SRC-I Demonstration Plant. It sets forth: basic engineering data, e.g., type and size of plant, feedstocks, product specifications, and atmospheric emission and waste disposal limits; utility conditions; equipment design criteria and sparing philosophy; and estimating criteria for economic considerations. Previously the formal ICRC Document No. 0001-01-002 has been submitted to DOE and revised, as necessary, to be consistent with the SRC-I Project Baseline. Revision 6, dated 19 March 1982, 51 pages, was forwarded to DOE on 19 March 1982.

  14. Baca geothermal demonstration project. Power plant detail design document

    Energy Technology Data Exchange (ETDEWEB)

    1981-02-01

    This Baca Geothermal Demonstration Power Plant document presents the design criteria and detail design for power plant equipment and systems, as well as discussing the rationale used to arrive at the design. Where applicable, results of in-house evaluations of alternatives are presented.

  15. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    Science.gov (United States)

    Widyolar, Bennett K.

    A solar thermal cooling system using novel non-tracking External Compound Parabolic Concentrators (XCPC) has been built at the University of California, Merced and operated for two cooling seasons. Its performance in providing power for space cooling has been analyzed. This solar cooling system is comprised of 53.3 m2 of XCPC trough collectors which are used to power a 23 kW double effect (LiBr) absorption chiller. This is the first system that combines both XCPC and absorption chilling technologies. Performance of the system was measured in both sunny and cloudy conditions, with both clean and dirty collectors. It was found that these collectors are well suited at providing thermal power to drive absorption cooling systems and that both the coinciding of available thermal power with cooling demand and the simplicity of the XCPC collectors compared to other solar thermal collectors makes them a highly attractive candidate for cooling projects.

  16. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  17. LIFAC sorbent injection desulfurization demonstration project. Final report, volume II: Project performance and economics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This publication discusses the demonstration of the LIFAC sorbent injection technology at Richmond Power and Light`s Whitewater Valley Unit No. 2, performed under the auspices of the U.S. Department of Energy`s (DOE) Clean Coal Technology Program. LIFAC is a sorbent injection technology capable of removing 75 to 85 percent of a power plant`s SO{sub 2} emissions using limestone at calcium to sulfur molar ratios of between 2 and 2.5 to 1. The site of the demonstration is a coal-fired electric utility power plant located in Richmond, Indiana. The project is being conducted by LIFAC North America (LIFAC NA), a joint venture partnership of Tampella Power Corporation and ICF Kaiser Engineers, in cooperation with DOE, RP&L, and Research Institute (EPRI), the State of Indiana, and Black Beauty Coal Company. The purpose of Public Design Report Volume 2: Project Performance and Economics is to consolidate, for public use, the technical efficiency and economy of the LIFAC Process. The report has been prepared pursuant to the Cooperative Agreement No. DE-FC22-90PC90548 between LIFAC NA and the U.S. Department of Energy.

  18. Energy Storage/Conservation and Carbon Emissions Reduction Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Bigelow, Erik [Center For Transportation And The Environment, Inc., Atlanta, GA (United States)

    2013-01-01

    The U.S. Department of Energy (DOE) awarded the Center for Transportation and the Environment (CTE) federal assistance for the management of a project to develop and test a prototype flywheel-based energy recovery and storage system in partnership with Test Devices, Inc. (TDI). TDI specializes in the testing of jet engine and power generation turbines, which uses a great deal of electrical power for long periods of time. In fact, in 2007, the company consumed 3,498,500 kW-­hr of electricity in their operations, which is equivalent to the electricity of 328 households. For this project, CTE and TDI developed and tested a prototype flywheel-based energy recovery and storage system. This technology is being developed at TDI’s facilities to capture and reuse the energy necessary for the company’s core process. The new technology and equipment is expected to save approximately 80% of the energy used in the TDI process, reducing total annual consumption of power by approximately 60%, saving approximately two million kilowatt-hours annually. Additionally, the energy recycling system will allow TDI and other end users to lower their peak power demand and reduce associated utility demand charges. The use of flywheels in this application is novel and requires significant development work from TDI. Flywheels combine low maintenance costs with very high cycle life with little to no degradation over time, resulting in lifetimes measured in decades. All of these features make flywheels a very attractive option compared to other forms of energy storage, including batteries. Development and deployment of this energy recycling technology will reduce energy consumption during jet engine and stationary turbine development. By reengineering the current inefficient testing process, TDI will reduce risk and time to market of efficiency upgrades of gas turbines across the entire spectrum of applications. Once in place the results from this program will also help other US industries

  19. Intelligent Bus Stops in the Flexible Bus Systems

    Directory of Open Access Journals (Sweden)

    Razi Iqbal

    2014-09-01

    Full Text Available The purpose of this paper is to discuss Intelligent Bus Stops in a special Demand Responsive Transit (DRT, the Flexible Bus System. These Intelligent Bus Stops are more efficient and information rich than Traditional Bus Stops. The real time synchronization of the Flexible Bus System makes it unique as compared to Traditional Bus Systems. The Main concern is to make Bus Stops intelligent and information rich. Buses are informed about the no. of passengers waiting at the upcoming Bus Stops. If there are no passengers to ride or get off on upcoming Bus Stop, the Bus can skip that Bus Stop and head towards the next Bus Stop where passenger is waiting, which will decrease the ride time of the passengers on the Bus and also the wait time of the passengers waiting on the upcoming Bus Stops. Providing more information at Bus Stops about the Destination (Time to Destination, Distance to Destination etc. and Buses (Bus Location, Arrival Time of Bus etc. makes it easier for the passengers to decide whether to ride a particular Bus or not.

  20. Demonstration Report: ESTCP UXO Discrimination Study ESTCP PROJECT # MM-0838

    Energy Technology Data Exchange (ETDEWEB)

    Gasperikova, Erika

    2010-02-15

    In 2003, the Defense Science Board observed: 'The problem is that instruments that can detect the buried UXOs also detect numerous scrap metal objects and other artifacts, which leads to an enormous amount of expensive digging. Typically 100 holes may be dug before a real UXO is unearthed! The Task Force assessment is that much of this wasteful digging can be eliminated by the use of more advanced technology instruments that exploit modern digital processing and advanced multi-mode sensors to achieve an improved level of discrimination of scrap from UXOs.' Significant progress has been made in discrimination technology. To date, testing of these approaches has been primarily limited to test sites with only limited application at live sites. Acceptance of discrimination technologies requires demonstration of system capabilities at real UXO sites under real world conditions. Any attempt to declare detected anomalies to be harmless and requiring no further investigation will require demonstration to regulators of not only individual technologies, but of an entire decision making process. This characterization study was be the second phase in what is expected to be a continuing effort that will span several years. The FY06 Defense Appropriation contained funding for the 'Development of Advanced, Sophisticated, Discrimination Technologies for UXO Cleanup' in the Environmental Security Technology Certification Program (ESTCP). ESTCP responded by conducting a UXO Discrimination Study at the former Camp Sibert, AL. The results of this first demonstration were very encouraging. Although conditions were favorable at this site, a single target of interest (4.2-in mortar) and benign topography and geology, all of the classification approaches demonstrated were able to correctly identify a sizable fraction of the anomalies as arising from non-hazardous items that could be safely left in the ground. To build upon the success of the first phase of this study

  1. Next Generation Luminaire (NGL) Downlight Demonstration Project, Hilton Columbus Downtown

    Energy Technology Data Exchange (ETDEWEB)

    Davis, R. G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Perrin, T. E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-09-30

    At the Hilton Columbus Downtown hotel in Ohio, DOE's Better Buildings Alliance conducted a demonstration of Next Generation Luminaires-winning downlights installed in all guest rooms and suites prior to the hotel's 2012 opening. After a post-occupancy assessment, the LED downlights not only provided the aesthetic appearance and dimming functionality desired, but also provided 50% energy savings relative to a comparable CFL downlight and enabled the lighting power to be more than 20% below that allowed by code.

  2. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. Annual report, 1988

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association`s NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration plan was completed. (VC)

  3. Demonstration projects of hydrogen mobility. The clean energy partnership (CEP)

    Energy Technology Data Exchange (ETDEWEB)

    Kirchner, Rene [TOTAL Deutschland GmbH / Clean Energy Partnership, Berlin (Germany)

    2013-06-01

    The Clean Energy Partnership (CEP)- an alliance of currently sixteen leading companies in Germany- shows that it may be doable to establish hydrogen as 'fuel of the future'. With Air Liquide, Berliner Verkehrsbetriebe (BVG), BMW, Daimler, EnBW, Ford, GM/Opel, Hamburger Hochbahn, Honda, Linde, Shell, Siemens, Total, Toyota, Vattenfall Europe and Volkswagen, the project partners include technology, oil and utility companies as well as major car manufacturers and two leading public transport companies of the two biggest German cities. The goal of CEP is to test using hydrogen- and fuel-cell technology on an everyday basis in the mobility sector with regard to individual traffic and public transport. Challenges are the use and supply of ''green'' hydrogen as well the serial production of hydrogen vehicles as well as the extension of the hydrogen filling station network. Nevertheless, Germany is a frontrunner when it comes to hydrogen mobility with currently 15 stations and 50% green hydrogen offered already today. (orig.)

  4. Solar demonstration project in a fast-food restaurant

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    The purpose of this project was to engineer, design, install and interface a solar collector system to an existing heat reclamation and energy conserving restaurant. Sixty evacuated tube, semi-concentrating solar collectors with an effective area of 888 square feet were installed. Solar heat was transferred through two heat exchangers to one of two 3000 gallon storage tanks. Two heat exchangers were used to isolate the ethylene used in the potable hot water storage tank. Much of the heat reclamation equipment of Phase 1 continued to supply heat to the system's 3000 gallon hot water storage tanks which supplied hot water for the dishwasher, for public use and for pre-heating make-up air to the restaurant's heating system. The Data Acquisition System used to monitor all systems during Phase 1 continued to monitor and analyze data from some 150 data points including the solar collector retrofit. In addition a multipoint chart recorder was used to give a visual, real time, temperature graph of the solar collector system, heat exchangers and storage tank. Details are given of the solar collector installation, the energy conserving and heat reclaiming equipment and the data acquisition problems and recommendations and conclusions are given.

  5. North Stanley Polymer Demonstration Project, second annual report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, J.P.; Cunningham, J.W.; DuBois, B.M.

    1977-10-01

    This project is a cooperative test of the economics of polymer enhanced waterflooding and is a field scale test involving 1,010 productive acres containing 72 million barrels of pore volume, 19 injection wells, and 28 producers. The primary activity during the second year was successful injection of the polymer slug. Polymer injection was completed June 22, 1977, after injecting 1,194,770 pounds of Dow Pusher 700 and 11,962,918 barrels of water over a period of 372 days. The average polymer concentration was 285 ppM. Nine of the injection wells were given Channelblock (TM) treatments. One well, Pappin 12, did not respond to the Channelblock treatment; it was the closest well to the injection plant, and the pressure was too high for the soft gel to hold. The rate on Pappin 12 was then restricted by use of a flow regulator coil; the polymer (250 ppM) underwent 12% shear degradation passing through the regulator coil. Movement of the slug through the reservoir was monitored by analysis of produced water samples. The producing wells were sampled every two weeks from Feb. through June and once a month thereafter. The water samples were analyzed for salinity and polymer. The primary producing problem was a change in the producing well fluid levels resulting from the changes in injection distribution, and it was necessary to either change out the pump or lower the present pump which resulted in less efficiency. The oil production started responding in Sept. 1976 by increasing 15 BPD to 581 BPD. It increased to 586 BPD in Oct., 590 BPD in Nov., and 592 BPD in Dec. In Jan., production jumped to 660 BPD. It fell back to 641 in Feb. but slowly increased to 658 BPD by May. June's production fell back to 645 BPD, partially as a result of lower injection rates experienced when polymer injection was terminated. (DLC)

  6. BACA Project: geothermal demonstration power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  7. Energy efficiency of different bus subsystems in Belgrade public transport

    Directory of Open Access Journals (Sweden)

    Mišanović Slobodan M.

    2015-01-01

    Full Text Available Research in this paper comprised experimental determination of energy efficiency of different bus subsystems (diesel bus, trolleybus and fully electric bus on chosen public transport route in Belgrade. Experimental measuring of energy efficiency of each bus type has been done based on the analysis of parameters of vehicle driving cycles between stops. Results of this analysis were basis for development of theoretical simulation model of energy efficiency. The model was latter compared with the results of simulation done by "Solaris bus & Coach" company for the chosen electric bus route. Based on demonstrated simulation, characteristics of electric bus batteries were defined, the method and dynamic of their recharge was suggested, as well as choice for other aggregates for drive system and technical characteristics for the electric buses were suggested.

  8. TPG bus passes

    CERN Multimedia

    Staff Association

    2013-01-01

    The CERN Staff Association will stop selling TPG bus passes. All active and retired members of the CERN personnel will be able to purchase Unireso bus passes from the CERN Hostel - Building 39 (Meyrin site) from 1st February 2013. For more information: https://cds.cern.ch/journal/CERNBulletin/2013/04/Announcements/1505279?ln=en

  9. Direct gain, insulated storage collector, demonstration project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Tyler, M.E.

    1983-12-31

    A home was constructed to demonstrate to housing professionals and individuals how well a home with passive solar design elements will function in the Piedmont region of North Carolina. The 1600 square foot wood framed house was designed to have broad market appeal. There are a number of passive solar design elements utilized, as well as close attention paid to details of thermally efficient construction. Enough glass is on the south side of the living area to provide sufficient heat on sunny days. Over half of the south glass is in the basement where there is thermal mass in the form of 55 gallon water drums and a thick concrete floor. They store the heat absorbed from the sun. This heat then radiates into the rest of the house at night. Having the thermal mass separated from the living space greatly reduces the problem of morning thermal lag, which is often seen in water wall homes. Temperature data were recorded to establish the thermal performance of the house. The quality of temperature control with this design has proven to be viable and cost effective for this region. These data, along with the concepts of solar design for the Piedmont region of North Carolina, have been presented to both individuals and housing professionals. Educational brochures were prepared and distributed, slide lectures given, group and individual consultations provided, and numerous site visits conducted.

  10. 75 FR 27865 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2010-05-18

    ... the AFRL Personnel Demonstration Project to AFRL employees in Business Management and Professional... Project to AFRL employees in Business Management and Professional, Technician, and Mission Support... include AFRL employees in Business Management and Professional, Technician, and Mission...

  11. PinBus Interface Design

    Energy Technology Data Exchange (ETDEWEB)

    Hammerstrom, Donald J.; Adgerson, Jewel D.; Sastry, Chellury; Pratt, Richard M.; Pratt, Robert G.

    2009-12-30

    On behalf of the U.S. Department of Energy, PNNL has explored and expanded upon a simple control interface that might have merit for the inexpensive communication of smart grid operational objectives (demand response, for example) to small electric end-use devices and appliances. The approach relies on bi-directional communication via the electrical voltage states of from one to eight shared interconnection pins. The name PinBus has been suggested and adopted for the proposed interface protocol. The protocol is defined through the presentation of state diagrams and the pins’ functional definitions. Both simulations and laboratory demonstrations are being conducted to demonstrate the elegance and power of the suggested approach. PinBus supports a very high degree of interoperability across its interfaces, allowing innumerable pairings of devices and communication protocols and supporting the practice of practically any smart grid use case.

  12. 78 FR 34655 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2013-06-10

    ... of the Secretary Science and Technology Reinvention Laboratory Personnel Management Demonstration... Demonstration Project (75 FR 77380-77447, December 10, 2010). SUMMARY: On December 10, 2010 (75 FR 77380-77447), DoD published a notice of approval of a personnel management demonstration project for eligible...

  13. The magic school bus TV project. Final technical performance report, July 1, 1992--July 31, 1995. Season III

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    For Season III, our goal has been to produce 13 new episodes that can optimally benefit from our research and experience in developing this unique series. With a total of 39 episodes, MSB`s third season will move the production from a weekly to a daily series, airing Monday to Friday and Sundays on PBS. As we delivered the 13 Season II episodes to PBS during fall of 1995, we also completed 13 more scripts for Season III production. During the remaining portion of Season III, these 13 scripts are being animated and prepared for delivery to PBS for an October 7th, 1996 launch date. Based on staggered phases of production used since the project`s inception, the development of science topics and show scripting for Season IV occurs at the same time that Season III shows are in animation and post-production. Thus, topics for Season IV shows are being selected, and science research and scripting have also begun during this time period. Both the National Science Foundation and PBS have made a commitment to Season IV, and a proposal has been submitted to Microsoft for consideration.

  14. 77 FR 69601 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects

    Science.gov (United States)

    2012-11-20

    ... of the Secretary Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense (Civilian Personnel Policy) (DASD (CPP)), Department of Defense (DoD). ACTION: Notice of proposed amendment to demonstration...

  15. 78 FR 33051 - Non-Rock Alternatives to Shoreline Protection Demonstration Project (LA-16) Iberia, Jefferson...

    Science.gov (United States)

    2013-06-03

    ... Natural Resources Conservation Service Non-Rock Alternatives to Shoreline Protection Demonstration Project... environmental impact statement is not being prepared for the Non-Rock Alternatives to Shoreline Protection... statement is not needed for this project. The project will install and monitor various shoreline...

  16. 75 FR 8927 - Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended Care Health...

    Science.gov (United States)

    2010-02-26

    ... of the Secretary Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...: This notice provides a 2-year extension of the Department of Defense Enhanced Access to Autism Services Demonstration Project under the Extended Care Health Option for beneficiaries diagnosed with an Autism...

  17. The Social Security Administration's Youth Transition Demonstration Projects: Interim Report on Transition WORKS

    Science.gov (United States)

    Fraker, Thomas; Black, Alison; Mamun, Arif; Manno, Michelle; Martinez, John; O'Day, Bonnie; O'Toole, Meghan; Rangarajan, Anu; Reed, Debbie

    2011-01-01

    The Social Security Administration is funding a random assignment evaluation of six demonstration projects to improve employment and other outcomes for youth ages 14 to 25 who are either receiving disability benefits or are at high risk of receiving them in the future. This report reviews the Youth Transition Demonstration (YTD) projects, located…

  18. Pilot Field Demonstration of Alternative Fuels in Force Projection Petroleum and Water Distribution Equipment

    Science.gov (United States)

    2014-09-04

    UNCLASSIFIED UNCLASSIFIED PILOT FIELD DEMONSTRATION OF ALTERNATIVE FUELS IN FORCE PROJECTION PETROLEUM AND WATER DISTRIBUTION EQUIPMENT...Fort Belvoir, Virginia 22060- 6218. Disposition Instructions Destroy this report when no longer needed. Do not return it to the originator ...UNCLASSIFIED UNCLASSIFIED PILOT FIELD DEMONSTRATION OF ALTERNATIVE FUELS IN FORCE PROJECTION PETROLEUM AND WATER DISTRIBUTION EQUIPMENT

  19. Using "Demonstrations, Class Experiments, and the Projection Lantern" in the History of Psychology Course.

    Science.gov (United States)

    Caudle, Fairfid M.

    1979-01-01

    Brief descriptions are offered of activities relevant to teaching the history of psychology. Suggestions range from simple demonstrations requiring no materials to more extensive projects. Reconstruction of early laboratory instruments such as the projection lantern, demonstrations of psychological concepts, and studies of associative processes…

  20. An Efficient Segmental Bus-Invert Coding Method for Instruction Memory Data Bus Switching Reduction

    Directory of Open Access Journals (Sweden)

    Gu Ji

    2009-01-01

    Full Text Available Abstract This paper presents a bus coding methodology for the instruction memory data bus switching reduction. Compared to the existing state-of-the-art multiway partial bus-invert (MPBI coding which relies on data bit correlation, our approach is very effective in reducing the switching activity of the instruction data buses, since little bit correlation can be observed in the instruction data. Our experiments demonstrate that the proposed encoding can reduce up to 42% of switching activity, with an average of 30% reduction, while MPBI achieves just 17.6% reduction in switching activity.

  1. LHC on the bus

    CERN Multimedia

    Laëtitia Pedroso

    2010-01-01

    On 15 December, an airport bus will be transformed in the image of CERN. The bus will be seen by the thousands of travellers arriving in Geneva, informing them of the possibility to visit CERN.   Sketch of the bus. The good relationship between Geneva International Airport and CERN started several years ago. In 2004 the airport put advertising space in the arrivals area at CERN's disposal free of charge. Now, starting on 15 December, a 40-foot long bus will display a giant sticker advertisement depicting CERN as it takes passengers over the airport tarmac to their planes. This is no ordinary sticker, and it was no mean task to attach it to the bus. The task of producing and attaching it was entrusted to Geneva-based specialists Mathys SA. With the ski season opening on 15 December, there will be many travellers arriving at the airport, and the bus will be ready to receive them. When one thinks of CERN, the subjects that naturally come to mind are the LHC, the mysteries of the Universe...

  2. BUS 100 Introduction To Business Entire Course

    OpenAIRE

    Laynebaril

    2017-01-01

      BUS 100 Introduction To Business Entire Course Click Link Below To Buy: http://hwcampus.com/shop/bus-100-introduction-to-business-entire-course/   BUS 100 Assignment 1 Fundamentals of Effective Communication in the Workplace BUS 100 Assignment 2 Ethical and Socially Responsive Business BUS 100 Introduction To Business Week 1-11 Discussions BUS 100 week 1 discussions BUS 100 week 2 Discussions BUS 100 week 3 Discussions BUS 100 week 4 Discussions ...

  3. Report on FS survey for project of introduction of highly energy-efficient trolley buses into the Mexico Metropolitan Area in FY 1997; 1997 nendo chosa hokokusho (Mexico city eno sho energy gata trolley bus donyu project FS chosa)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Traffic jam and air pollution by automobiles are currently getting severe in the Mexico Metropolitan Area. Trolley buses were introduced for improving the environment more than ten years ago. Vehicles become too old for use, and their energy efficiency is low. In this project, 200 highly energy-efficient trolley buses are introduced to replace old inefficient trolley buses, which results in the improved traffic convenience in the City and enhanced energy efficiency. The new energy-efficient trolley buses are made of energy-efficient control VVVF inverters produced and exported by MELCO (Mitsubishi Electric Corporation), energy-efficient motors by MELMEX (Mitsubishi Electric Corporation, Mexico), and bodies by MASA which is a major manufacturer of bus bodies. The objective of this research is to analyze the background of introduction of new energy-efficient trolley buses and the effects of the present project. The results of analysis are going to be utilized for future promotion of the Joint Implementation and Clean Development Mechanism. 30 refs., 30 figs., 24 tabs.

  4. Final report for the Department of Energy funded cooperative agreement ''Electronic Research Demonstration Project'' [University electronic research administration demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Rodman, John

    1998-07-31

    This is the final report for the Department of Energy (DOE) funded cooperative agreement ''Electronic Research Demonstration Project (DE-FC02-92ER35180)'' for the period August 1994-July 1998. The goal of the project, referred to as NewERA, was to demonstrate the use of open standards for electronic commerce to support research administration, otherwise referred to as Electronic Research Administration (ERA). The NewERA demonstration project provided a means to test interagency standards developed within the Federal Grant Electronic Commerce Committee, a group comprised of federal granting agencies. The NewERA program was initiated by DOE. NewERA was comprised of three separate, but related, ERA activities in preaward administration, postaward administration, and secure Internet commerce. The goal of New ERA was to demonstrate an open standard implementation of ERA using electronic data interchange, e-mail and Internet transaction security between grant applicants and DOE, along with t h e other participating agencies.

  5. Learning through a portfolio of carbon capture and storage demonstration projects

    Science.gov (United States)

    Reiner, David M.

    2016-01-01

    Carbon dioxide capture and storage (CCS) technology is considered by many to be an essential route to meet climate mitigation targets in the power and industrial sectors. Deploying CCS technologies globally will first require a portfolio of large-scale demonstration projects. These first projects should assist learning by diversity, learning by replication, de-risking the technologies and developing viable business models. From 2005 to 2009, optimism about the pace of CCS rollout led to mutually independent efforts in the European Union, North America and Australia to assemble portfolios of projects. Since 2009, only a few of these many project proposals remain viable, but the initial rationales for demonstration have not been revisited in the face of changing circumstances. Here I argue that learning is now both more difficult and more important given the slow pace of deployment. Developing a more coordinated global portfolio will facilitate learning across projects and may determine whether CCS ever emerges from the demonstration phase.

  6. Learning to make technology work - a study of learning in technology demonstration projects

    DEFF Research Database (Denmark)

    Sutherland Olsen, Dorothy; Andersen, Per Dannemand

    2014-01-01

    Building working demonstrations of new technologies within sustainable energy and transport has become an important activity in the move towards a more energy efficient society. The work involved in building these demonstrations is usually organised in a project with a variety of different partic...... of these projects. We then discuss concepts of learning and develop an analytical framework for our study of demonstrations within sustainable energy and transport in Scandinavia....... participants, including users. The aim of the project is usually to test the technology and promote changes in users habits, while learning is frequently cited as the main outcome. In this paper we review existing studies of demonstration projects and try to gain an overview of the main aims and effects...

  7. Arapaho National Wildlife Refuge and the Owl Moutain Partnership riparian/meadow management demonstration project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Arapaho National Wildlife Refuge (Refuge) and the Owl Mountain Partnership (OMP) are implementing a 5-year riparian/meadow management demonstration project. The...

  8. Evaluating a "Second Life" Problem-Based Learning (PBL) Demonstrator Project: What Can We Learn?

    Science.gov (United States)

    Beaumont, Chris; Savin-Baden, Maggi; Conradi, Emily; Poulton, Terry

    2014-01-01

    This article reports the findings of a demonstrator project to evaluate how effectively Immersive Virtual Worlds (IVWs) could support problem-based learning. The project designed, created and evaluated eight scenarios within "Second Life" (SL) for undergraduate courses in health care management and paramedic training. Evaluation was…

  9. Modeling the Coordinated Operation between Bus Rapid Transit and Bus

    OpenAIRE

    Jiaqing Wu; Rui Song; Youan Wang; Feng Chen; Shubin Li

    2015-01-01

    The coordination between bus rapid transit (BRT) and feeder bus service is helpful in improving the operational efficiency and service level of urban public transport system. Therefore, a coordinated operation model of BRT and bus is intended to develop in this paper. The total costs are formulated and optimized by genetic algorithm. Moreover, the skip-stop BRT operation is considered when building the coordinated operation model. A case of the existing bus network in Beijing is studied, the ...

  10. BUS 438 Concepts of Emerging Markets

    OpenAIRE

    Laynebaril

    2017-01-01

    BUS 438 Concepts of Emerging Markets Click Link Below To Buy: http://hwcampus.com/shop/bus-438-concepts-of-emerging-markets/   BUS438 BUS/438  MODULE 3 ASSIGNMENT 3 Concepts of Emerging Markets [ARGOSY

  11. Advanced eGovernment Information Service Bus (eGov-Bus

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available The eGov-Bus project provides citizens and businesses with improved access to virtual public services, which are based on existing national eGovernment Web services and which support cross-border life events. Requirements and specific rules of these life events are considered, and personalization of user preferences is supported. eGov-Bus is based on adaptable process management technologies, allowing for virtual services which are dynamically combined from existing national eGovernment services. In this way, a comprehensive workflow process is set up, allowing for service-level agreements, an audit trail and explanation of the process to the end user. The eGov-Bus process engine operates on top of a virtual repository, providing a high-level semantic view of information retrieved from heterogeneous information sources, such as eGovernment Web services. Further, eGov-Bus relies on a security framework to ensure all high-level security requirements are met. The eGov-Bus architecture is business oriented, it focuses on Service Oriented Architecture (SOA concepts, asynchronously combining Web services and providing a Service Bus.

  12. Model Passengers’ Travel Time for Conventional Bus Stop

    Directory of Open Access Journals (Sweden)

    Guangzhao Xin

    2014-01-01

    Full Text Available Limited number of berths can result in a subsequent bus stopping at the upstream of a bus stop when all berths are occupied. When this traffic phenomenon occurs, passengers waiting on the platform usually prefer walking to the stopped bus, which leads to additional walking time before boarding the bus. Therefore, passengers’ travel time consumed at a bus stop is divided into waiting time, additional walking time, and boarding time. This paper proposed a mathematical model for analyzing passengers’ travel time at conventional bus stop based on theory of stochastic service system. Field-measured and simulated data were designated to demonstrate the effectiveness of the proposed model. By analyzing the results, conclusion was conducted that short headway can reduce passengers’ waiting time at bus stop. Meanwhile, the theoretical analysis explained the inefficiency of bus stops with more than three berths from the perspective of passengers’ additional walking time. Additional walking time will increase in a large scale when the number of berths at a bus stop exceedsthe threshold of three.

  13. Industrial Fuel Gas Demonstration Plant Project. Management plan (Deliverable No. 1)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-05-31

    This Project Management Plan establishes the organization and procedures by which the Memphis Medium-Btu Fuel Gas Demonstration Plant will be managed and defines the responsibilities and functions of project participants. This plan should not be construed as modifying contract provisions or documents in any way. It applies mainly to Phase I activities; the conceptual design and development of the demonstration plant. Plans for Phases II and III will be prepared before these phases are initiated. This management plan is intended to be a working document to be revised as the needs of the project dictate. The looseleaf format will facilitate changes by making it possible to add and remove pages.

  14. Inventory of demonstration and trail projects in sustainable energy and transport in Scandinavia

    DEFF Research Database (Denmark)

    Andersen, Per Dannemand; Cramer-Petersen, Claus Lundgaard; Harnes, Kristian N.;

    This report documents the work of work package 2 of the InnoDemo research project funded by the Research Council of Norway. Partners in the project are The Nordic Institute for Studies in Innovation, Research and Education (NIFU) (project leader), DTU Management Engineering at Technical University...... of Denmark, and CIRCLE at Lund’s University. From a state-of-the-art study in the project’s work package 1, a set of characteristics have been specified to be collected in an inventory of demonstration projects and funding programmes. This data was collected in parallel in Denmark, Norway and Sweden...

  15. 76 FR 80903 - Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under the Extended...

    Science.gov (United States)

    2011-12-27

    ... of the Secretary Extension of Autism Services Demonstration Project for TRICARE Beneficiaries Under.... SUMMARY: This notice provides a 2-year extension of the Department of Defense Enhanced Access to Autism... Autism Spectrum Disorder (ASD). Under the demonstration, the Department implemented a provider model...

  16. Personal Computer Monitors Instrumentation Bus

    Science.gov (United States)

    Conroy, Bruce L.

    1994-01-01

    IBM-compatible personal computer used instead of logic analyzer or other special instrument to monitor IEEE-488 interface data bus that interconnects various pieces of laboratory equipment. Needed is short program for computer, commercial general-purpose interface bus circuit card, and adapter cable to link card to bus. Software available in Ada or Quick Basic language.

  17. Learning NServiceBus

    CERN Document Server

    Boike, David

    2013-01-01

    This is a practical tutorial containing hands-on examples for creating a messaging and SOA based service bus.This book is for .NET developers who are looking for ways to overcome problems related to buggy third party web service integrations, codebases that have grown into a big ball of mud, and batch jobs failure.

  18. Pacific Northwest GridWise™ Testbed Demonstration Projects; Part I. Olympic Peninsula Project

    Energy Technology Data Exchange (ETDEWEB)

    Hammerstrom, Donald J.; Ambrosio, Ron; Carlon, Teresa A.; DeSteese, John G.; Horst, Gale R.; Kajfasz, Robert; Kiesling, Laura L.; Michie, Preston; Pratt, Robert G.; Yao, Mark; Brous, Jerry; Chassin, David P.; Guttromson, Ross T.; Jarvegren, Olof M.; Katipamula, Srinivas; Le, N. T.; Oliver, Terry V.; Thompson, Sandra E.

    2008-01-09

    This report describes the implementation and results of a field demonstration wherein residential electric water heaters and thermostats, commercial building space conditioning, municipal water pump loads, and several distributed generators were coordinated to manage constrained feeder electrical distribution through the two-way communication of load status and electric price signals. The field demonstration took place in Washington and Oregon and was paid for by the U.S. Department of Energy and several northwest utilities. Price is found to be an effective control signal for managing transmission or distribution congestion. Real-time signals at 5-minute intervals are shown to shift controlled load in time. The behaviors of customers and their responses under fixed, time-of-use, and real-time price contracts are compared. Peak loads are effectively reduced on the experimental feeder. A novel application of portfolio theory is applied to the selection of an optimal mix of customer contract types.

  19. Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sheppy, M.; Metzger, I.; Cutler, D.; Holland, G.; Hanada, A.

    2014-01-01

    As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

  20. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  1. Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

    Energy Technology Data Exchange (ETDEWEB)

    Tuenge, Jason R.

    2011-06-01

    The U.S. Department of Energy (DOE) is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service (NPS) views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other NPS tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr for this tunnel to a much larger figure national

  2. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  3. ULTRA-CLEAN FISCHER-TROPSCH FUELS PRODUCTION AND DEMONSTRATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Steve Bergin

    2004-10-18

    The Report Abstract provides summaries of the past year's activities relating to each of the main project objectives. Some of the objectives will be expanded on in greater detail further down in the report. The following objectives have their own addition sections in the report: SFP Construction and Fuel Production, Impact of SFP Fuel on Engine Performance, Fleet Testing at WMATA and Denali National Park, Demonstration of Clean Diesel Fuels in Diesel Electric Generators in Alaska, and Economic Analysis. ICRC provided overall project organization and budget management for the project. ICRC held meetings with various project participants. ICRC presented at the Department of Energy's annual project review meeting. The plant began producing fuel in October 2004. The first delivery of finished fuel was made in March of 2004 after the initial start-up period.

  4. The demonstration projects: creating the capacity for nursing health human resource planning in Ontario's healthcare organizations.

    Science.gov (United States)

    Burkoski, Vanessa; Tepper, Joshua

    2010-05-01

    Timely access to healthcare services requires the right number, mix and distribution of appropriately educated nurses, physicians and other healthcare professionals. In Ontario, as in several other jurisdictions, changing demographics, patterns of health service utilization and an aging workforce have created challenges related to the supply of nurses available now and in the future to deliver quality patient care. From 2006 to 2009, the Nursing Secretariat (NS) of Ontario's Ministry of Health and Long-Term Care (the ministry) undertook a progressive and comprehensive approach to address the issue of nursing supply across the province through the introduction of 17 Nursing Health Human Resources Demonstration Projects (demonstration projects). The demonstration projects initiative has led to the creation of a unique collection of best practices, tools and resources aimed at improving organizational planning capacity. Evaluation of the initiative generated recommendations that may guide the ministry toward policy and program development to foster improved nursing health human resource planning capacity in Ontario healthcare organizations.

  5. Los Alamos National Laboratory Tritium Technology Deployments Large Scale Demonstration and Deployment Project

    Energy Technology Data Exchange (ETDEWEB)

    McFee, J.; Blauvelt, D.; Stallings, E.; Willms, S.

    2002-02-26

    This paper describes the organization, planning and initial implementation of a DOE OST program to deploy proven, cost effective technologies into D&D programs throughout the complex. The primary intent is to accelerate closure of the projects thereby saving considerable funds and at the same time being protective of worker health and the environment. Most of the technologies in the ''toolkit'' for this program have been demonstrated at a DOE site as part of a Large Scale Demonstration and Deployment Project (LSDDP). The Mound Tritium D&D LSDDP served as the base program for the technologies being deployed in this project but other LSDDP demonstrated technologies or ready-for-use commercial technologies will also be considered. The project team will evaluate needs provided by site D&D project managers, match technologies against those needs and rank deployments using a criteria listing. After selecting deployments the project will purchase the equipment and provide a deployment engineer to facilitate the technology implementation. Other cost associated with the use of the technology will be borne by the site including operating staff, safety and health reviews etc. A cost and performance report will be prepared following the deployment to document the results.

  6. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  7. Milliken Clean Coal Technology Demonstration Project. Environmental monitoring report, July--September 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    New York State Electric and Gas Corporation (NYSEG) has installed and is presently operating a high-efficiency flue gas desulfurization (FGD) system to demonstrate innovative emissions control technology and comply with the Clean Air Act Amendments of 1990. The host facility for this demonstration project is NYSEG`s Milliken Station, in the Town of Lansing, New York. The primary objective of this project is to demonstrate a retrofit of energy-efficient SO{sub 2} and NO{sub x} control systems with minimal impact on overall plant efficiency. The demonstration project has added a forced oxidation, formic acid-enhanced wet limestone FGD system, which is expected to reduce SO{sub 2} emissions by at least 90 percent. NYSEG also made combustion modifications to each boiler and plans to demonstrate selective non-catalytic reduction (SNCR) technology on unit 1, which will reduce NO{sub x} emissions. Goals of the proposed demonstration include up to 98 percent SO{sub 2} removal efficiency while burning high-sulfur coal, 30 percent NO{sub x} reductions through combustion modifications, additional NO{sub x} reductions using SNCR technology, production of marketable commercial-grade gypsum and calcium chloride by-products to minimize solid waste disposal, and zero wastewater discharge.

  8. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    Energy Technology Data Exchange (ETDEWEB)

    Gasper, John R. [Argonne National Laboratory; Veselka, Thomas D. [Argonne National Laboratory; Mahalik, Matthew R. [Argonne National Laboratory; Hayse, John W. [Argonne National Laboratory; Saha, Samrat [Argonne National Laboratory; Wigmosta, Mark S. [PNNL; Voisin, Nathalie [PNNL; Rakowski, Cynthia [PNNL; Coleman, Andre [PNNL; Lowry, Thomas S. [SNL

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  9. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  11. Evaluation of the Stallings Classroom Management Staff Development Demonstration Project in Putnam County, West Virginia.

    Science.gov (United States)

    Meehan, Merrill L.

    An evaluation is presented of the Stallings Classroom Management Staff Development Demonstration Project, designed to increase student achievement in basic skills through the use of research-based, systematic change in teachers' classroom management and organizational techniques. One objective of the evaluation was to utilize techniques and to…

  12. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  13. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs.

  14. 75 FR 15693 - Extension of Web-Based TRICARE Assistance Program Demonstration Project

    Science.gov (United States)

    2010-03-30

    ... related services, including non-medical counseling and advice services to Active Duty Service members...-based technology. DATES: This extension will be effective April 1, 2010. The demonstration project will... and accessible counseling to Service members and their families who live in locations that are...

  15. From demonstration projects to volume market: Market development for advanced housing renovation

    NARCIS (Netherlands)

    Mlecnik, E.; Prendergast, E.; Rodsjo, A.; Haavik, T.; Parker, P.

    2010-01-01

    How do we get from demonstration projects to a volume market for very low energy demand in advanced housing renovation? The contributors to this report have been working with this issue for many years. Some worked in both IEA SHC Task 28 Sustainable Housing (2000-2005) and in SHC Task 37 Advanced Ho

  16. Summary of the evidence file demonstrating completion of the NIF Project Completion Criteria

    Energy Technology Data Exchange (ETDEWEB)

    Haynam, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-12-04

    This document summarizes the results of performance verification tests on NIF that demonstrate it has met its performance-related Project Completion Criteria (PCC). It includes measurements made on NIF with the NIF diagnostics, the calibration of these diagnostics and the supporting analyses that verify the NIF performance criteria have been met.

  17. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  18. Modeling the Coordinated Operation between Bus Rapid Transit and Bus

    Directory of Open Access Journals (Sweden)

    Jiaqing Wu

    2015-01-01

    Full Text Available The coordination between bus rapid transit (BRT and feeder bus service is helpful in improving the operational efficiency and service level of urban public transport system. Therefore, a coordinated operation model of BRT and bus is intended to develop in this paper. The total costs are formulated and optimized by genetic algorithm. Moreover, the skip-stop BRT operation is considered when building the coordinated operation model. A case of the existing bus network in Beijing is studied, the proposed coordinated operation model of BRT and bus is applied, and the optimized headway and costs are obtained. The results show that the coordinated operation model could effectively decrease the total costs of the transit system and the transfer time of passengers. The results also suggest that the coordination between the skip-stop BRT and bus during peak hour is more effective than non-coordination operation.

  19. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan [National Renewable Energy Lab. (NREL), Golden, CO (United States); O' Neill, Barbara [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  20. Introduction of MAN Lion’s City Conceptual Articulated Bus%德国曼恩客车系列愈加丰富

    Institute of Scientific and Technical Information of China (English)

    云清文

    2016-01-01

    During IAA 2016, German based MAN demonstrated total of ten models of various buses including city-bus, city-to-city bus and long-distance bus, etc. Among all these models, the most innovative highlight is the model of MAN Lion’s City Conceptual Articulated bus, as well as the re-charging technology associated to it.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV)

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  8. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Wrotniak, Chester M. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  9. Electric Ground Support Equipment Advanced Battery Technology Demonstration Project at the Ontario Airport

    Energy Technology Data Exchange (ETDEWEB)

    Tyler Gray; Jeremy Diez; Jeffrey Wishart; James Francfort

    2013-07-01

    The intent of the electric Ground Support Equipment (eGSE) demonstration is to evaluate the day-to-day vehicle performance of electric baggage tractors using two advanced battery technologies to demonstrate possible replacements for the flooded lead-acid (FLA) batteries utilized throughout the industry. These advanced battery technologies have the potential to resolve barriers to the widespread adoption of eGSE deployment. Validation testing had not previously been performed within fleet operations to determine if the performance of current advanced batteries is sufficient to withstand the duty cycle of electric baggage tractors. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. The demonstration project also grew the relationship with Southwest Airlines (SWA), our demonstration partner at Ontario International Airport (ONT), located in Ontario, California. The results of this study have encouraged a proposal for a future demonstration project with SWA.

  10. The Sydney 2000 World Weather Research Programme Forecast Demonstration Project: Overview and Current Status.

    Science.gov (United States)

    Keenan, T.; Joe, P.; Wilson, J.; Collier, C.; Golding, B.; Burgess, D.; May, P.; Pierce, C.; Bally, J.; Crook, A.; Seed, A.; Sills, D.; Berry, L.; Potts, R.; Bell, I.; Fox, N.; Ebert, E.; Eilts, M.;  O'Loughlin, K.;  Webb, R.;  Carbone, R.;  Browning, K.;  Roberts, R.;  Mueller, C.

    2003-08-01

    The first World Weather Research Programme (WWRP) Forecast Demonstration Project (FDP), with a focus on nowcasting, was conducted in Sydney, Australia, from 4 September to 21 November 2000 during a period associated with the Sydney 2000 Olympic Games. Through international collaboration, nine nowcasting systems from the United States, United Kingdom, Canada, and Australia were deployed at the Sydney Office of the Bureau of Meteorology (BOM) to demonstrate the capability of modern forecast systems and to quantify the associated benefits in the delivery of a real-time nowcast service. On-going verification and impact studies supported by international committees assisted by the WWRP formed an integral part of this project. A description is given of the project, including component systems, the weather, and initial outcomes. Initial results show that the nowcasting systems tested were transferable and able to provide valuable information enhancing BOM nowcasts. The project provided for unprecedented interchange of concepts and ideas between forecasters, researchers, and end users in an operational framework where they all faced common issues relevant to real time nowcast decision making. A training workshop sponsored by the World Meteorological Organization (WMO) was also held in conjunction with the project so that other member nations could benefit from the FDP.

  11. Blast Furnace Granulated Coal Injection System Demonstration Project public design report. Topical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The public design report describes the Blast Furnace Granulated Coal Injection (BFGCI) project under construction at Bethlehem Steel Corporation`s (BSC) Burns Harbor, Indiana, plant. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. The project is the first installation in the United States for the British Steel technology using granular coal in blast furnaces. The objective is to demonstrate that granular coal is an economic and reliable fuel which can successfully be applied to large North American blast furnaces. These include: coal grind size, coal injection rate, coal source (type) and blast furnace conversion method. To achieve the program objectives, the demonstration project is divided into the following three Phases: Phase I-Design; Phase II-Procurement & Construction; and Phase III-Operation. Preliminary design (Phase I) began in 1991 with detailed design commencing in April 1993. Construction at Burns Harbor (Phase II) began August 1993. Construction is expected to be complete in the first quarter of 1995 which will be followed by a demonstration test program (Phase III).

  12. BBIS: Beacon Bus Information System

    Science.gov (United States)

    Kasim, Shahreen; Hafit, Hanayanti; Pei Juin, Kong; Afizah Afif, Zehan; Hashim, Rathiah; Ruslai, Husni; Jahidin, Kamaruzzaman; Syafwan Arshad, Mohammad

    2016-11-01

    Lack of bus information for example bus timetable, status of the bus and messy advertisement on bulletin board at the bus stop will give negative impact to tourist. Therefore, a real-time update bus information bulletin board provides all information needed so that passengers can save their bus information searching time. Supported with Android or iOS, Beacon Bus Information System (BBIS) provides bus information between Batu Pahat and Kluang area. BBIS is a system that implements physical web technology and interaction on demand. It built on Backend-as-a-Service, a cloud solution and Firebase non relational database as data persistence backend and syncs between user client in the real-time. People walk through bus stop with smart device and do not require any application. Bluetooth Beacon is used to achieve smart device's best performance of data sharing. Intellij IDEA 15 is one of the tools that that used to develop the BBIS system. Multi-language included front end and backend supported Integration development environment (IDE) helped to speed up integration process.

  13. Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-02-22

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  14. Commercial scale demonstration enhanced oil recovery by miceller-polymer flooding. M-1 project: facilities report

    Energy Technology Data Exchange (ETDEWEB)

    Knight, B.L. (ed.)

    1977-04-01

    ERDA and Marathon Oil Company contracted together for a commercial scale demonstration of enhanced oil recovery by the Maraflood (TM) oil recovery process. This M-1 Project is located within Sections 15, 16, 21 and 22, T6N, R13W, Crawford County, Illinois, encompassing approximately 407 acres of Robinson Sand reservoir developed in the first decade of the century. The area covers portions of several waterfloods developed on 10-acre spacing in the 1950's that were approaching their economic limit. This report describes all M-1 Project facilities, how they were prepared or constructed, their purpose and how they operate: (1) wells (drilling and completion); (2) production facility; (3) injection facility; and (4) various service systems required during project development and/or operation. (48 fig, 7 tables) (DLC).

  15. West Valley demonstration project: alternative processes for solidifying the high-level wastes

    Energy Technology Data Exchange (ETDEWEB)

    Holton, L.K.; Larson, D.E.; Partain, W.L.; Treat, R.L.

    1981-10-01

    In 1980, the US Department of Energy (DOE) established the West Valley Solidification Project as the result of legislation passed by the US Congress. The purpose of this project was to carry out a high level nuclear waste management demonstration project at the Western New York Nuclear Service Center in West Valley, New York. The DOE authorized the Pacific Northwest Laboratory (PNL), which is operated by Battelle Memorial Institute, to assess alternative processes for treatment and solidification of the WNYNSC high-level wastes. The Process Alternatives Study is the suject of this report. Two pretreatment approaches and several waste form processes were selected for evaluation in this study. The two waste treatment approaches were the salt/sludge separation process and the combined waste process. Both terminal and interim waste form processes were studied.

  16. Structures and Design Phase I Summary for the NASA Composite Cryotank Technology Demonstration Project

    Science.gov (United States)

    Johnson, Ted; Sleight, David W.; Martin, Robert A.

    2013-01-01

    A description of the Phase I structures and design work of the Composite Cryotank Technology Demonstration (CCTD) Project is in this paper. The goal of the CCTD Project in the Game Changing Development (GCD) Program is to design and build a composite liquid-hydrogen cryogenic tank that can save 30% in weight and 25% in cost compared to state-of-the-art aluminum metallic cryogenic tank technology when the wetted composite skin wall is at an allowable strain of 5000 in/in. Three Industry teams developed composite cryogenic tank concepts that are compared for weight to an aluminum-lithium (Al-Li) cryogenic tank designed by NASA in Phase I of the CCTD Project. The requirements used to design all of the cryogenic tanks in Phase I will be discussed and the resulting designs, analyses, and weight of the concepts developed by NASA and Industry will be reviewed and compared.

  17. Influences on parental acceptance of HPV vaccination in demonstration projects in Uganda and Vietnam.

    Science.gov (United States)

    Galagan, Sean R; Paul, Proma; Menezes, Lysander; LaMontagne, D Scott

    2013-06-26

    This study investigates the effect of communication strategies on human papillomavirus (HPV) vaccine uptake in HPV vaccine demonstration projects in Uganda and Vietnam. Secondary analysis was conducted on data from surveys of a representative sample of parents and guardians of girls eligible for HPV vaccine, measuring three-dose coverage achieved in demonstration projects in 2008-2010. Univariate and multivariate logistic regression analysis calculated the unadjusted and adjusted odds of receiving at least one dose of HPV vaccine depending on exposure to community influencers; information, education, and communication (IEC) channels; and demographic factors. This study found that exposure to community influencers was associated with HPV vaccine uptake in a multivariate model controlling for other factors. Exposure to non-interactive IEC channels was only marginally associated with HPV vaccine uptake. These results underscore the need of HPV vaccine programs in low- and middle-income countries to involve and utilize key community influencers and stakeholders to maximize HPV vaccine uptake.

  18. Demonstrators: a vital step forward for projection mask-less lithography (PML2)

    Science.gov (United States)

    Brandstaetter, Christoph; Haugeneder, Ernst; Doering, Hans-Joachim; Elster, Thomas; Heinitz, Joachim; Fortagne, Olaf; Eder-Kapl, Stefan; Lammer, Gertraud; Jochl, Peter; Loeschner, Hans; Reimer, Klaus; Saniter, Juergen; Talmi, Maati; Eberhardt, Ramona; Kroenert, Klaus

    2005-06-01

    Electron beam based Projection Mask-Less Lithography (PML2) is one of the promising candidates for fast chip devel-opment and prototyping as well as for small and medium volume device production for the 45nm technology node and beyond. The concept of the PML2 proof-of-concept tool comprises a single electron optical column, a multi beam blank-ing device (programmable "Aperture Plate System") including high speed optical data path and a scanning 300mm wa-fer stage. More than 290.000 beams will be projected onto the wafer used for a highly redundant scanning stripe expo-sure process. The PML2 proof-of-concept tool will be built as part of the European MEDEA+ project T409 and the joint project "Ab-bildungsmethodiken fur nanoelektronische Bauelemente-ABBILD" in Germany. To show the feasibility of PML2 key modules in an early stage several demonstrators and test stands have been developed. In this paper demonstration setups and first results of the electron optics modeling, gun prototype, Aperture Plate System and the Optical Data Path are pre-sented.

  19. 77 FR 48592 - Bus and Bus Facilities Discretionary Program Funds

    Science.gov (United States)

    2012-08-14

    ... authorized by 49 U.S.C. 5309(b), as amended by Section 3011 of the Safe, Affordable, Flexible, Efficient... Livability Initiatives (77 FR 6178). The NOFA explained the requirements and procedures for eligible... facilities, bus-related equipment, and transit asset management systems. The FY 2012 Bus...

  20. The PLX- α project: demonstrating the viability of spherically imploding plasma liners as an MIF driver

    Science.gov (United States)

    Hsu, S. C.; Witherspoon, F. D.; Cassibry, J. T.; Gilmore, M.; Samulyak, R.; Stoltz, P.; the PLX-α Team

    2015-11-01

    Under ARPA-E's ALPHA program, the Plasma Liner Experiment-ALPHA (PLX- α) project aims to demonstrate the viability and scalability of spherically imploding plasma liners as a standoff, high-implosion-velocity magneto-inertial-fusion (MIF) driver that is potentially compatible with both low- and high- β targets. The project has three major objectives: (a) advancing existing contoured-gap coaxial-gun technology to achieve higher operational reliability/precision and better control/reproducibility of plasma-jet properties and profiles; (2) conducting ~ π / 2 -solid-angle plasma-liner experiments with 9 guns to demonstrate (along with extrapolations from modeling) that the jet-merging process leads to Mach-number degradation and liner uniformity that are acceptable for MIF; and (3) conducting 4 π experiments with up to 60 guns to demonstrate the formation of an imploding spherical plasma liner for the first time, and to provide empirical ram-pressure and uniformity scaling data for benchmarking our codes and informing us whether the scalings justify further development beyond ALPHA. This talk will provide an overview of the PLX- α project as well as key research results to date. Supported by ARPA-E's ALPHA program; original PLX construction supported by DOE Fusion Energy Sciences.

  1. A Day in the Life of the Laser Communications Relay Demonstration Project

    Science.gov (United States)

    Edwards, Bernard; Israel, David; Caroglanian, Armen; Spero, James; Roberts, Tom; Moores, John

    2016-01-01

    This paper provides an overview of the planned concept of operations for the Laser Communications Relay Demonstration Project (LCRD), a joint project among NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MIT/LL). LCRD will provide at least two years of bi-directional optical communications at user data rates of up to 1.244 Gbps in an operational environment. The project lays the groundwork for establishing communications architecture and protocols, and developing the communications hardware and support infrastructure, concluding in a demonstration of optical communications' potential to meet NASA's growing need for higher data rates for future science and exploration missions. A pair of flight optical communications terminals will reside on a single commercial communications satellite in geostationary orbit; the two ground optical communications terminals will be located in Southern California and Hawaii. This paper summarizes the current LCRD architecture and key systems for the demonstration, focusing on what it will take to operate an optical communications relay that can support space-to-space, space-to-air, and space-to-ground optical links.

  2. A Day in the Life of the Laser Communications Relay Demonstration (LCRD) Project.

    Science.gov (United States)

    Israel, David; Caroglanian, Armen; Edwards, Bernard; Spero, James; Roberts, Tom; Moores, John

    2016-01-01

    This presentation provides an overview of the planned concept of operations for the Laser Communications Relay Demonstration Project (LCRD), a joint project among NASA's Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory, California Institute of Technology (JPL), and the Massachusetts Institute of Technology Lincoln Laboratory (MITLL). LCRD will provide at least two years of bi-directional optical communications at user data rates of up to 1.244 Gbps in an operational environment. The project lays the ground work for establishing communications architecture and protocols, and developing the communications hardware and support infrastructure, concluding in a demonstration of optical communications potential to meet NASAs growing need for higher data rates for future science and exploration missions. A pair of flight optical communications terminals will reside on a single commercial communications satellite in geostationary orbit; the two ground optical communications terminals will be located in Southern California and Hawaii. This paper summarizes the current LCRD architecture and key systems for the demonstration, focusing on what it will take to operate an optical communications relay that can support space-to-space, space-to-air, and space-to-ground optical links.

  3. RM12-2703 Advanced Rooftop Unit Control Retrofit Kit Field Demonstration: Hawaii and Guam Energy Improvement Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Doebber, I.; Dean, J.; Dominick, J.; Holland, G.

    2014-03-01

    As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This was one of several demonstrations of new and underutilized commercial energy efficiency technologies. The consistent year-round demand for air conditioning and dehumidification in Hawaii provides an advantageous demonstration location for advanced rooftop control (ARC) retrofit kits to packaged rooftop units (RTUs). This report summarizes the field demonstration of ARCs installed on nine RTUs serving a 70,000-ft2 exchange store (large retail) and two RTUs, each serving small office buildings located on Joint Base Pearl Harbor-Hickam (JBPHH).

  4. Advanced Coal Conversion Process Demonstration Project. Final technical progress report, January 1, 1995--December 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from January 1, 1995 through December 31, 1995. This project demonstrates an advanced, thermal, coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal Process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, and volatile sulfur compounds. After thermal upgrading, the coal is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal. The SynCoal Process enhances low-rank, western coals, usually with a moisture content of 25 to 55 percent, sulfur content of 0.5 to 1.5 percent, and heating value of 5,5000 to 9,000 British thermal units per pound (Btu/lb), by producing a stable, upgraded, coal product with a moisture content as low as 1 percent, sulfur content as low as 0.3 percent, and heating value up to 12,000 Btu/lb. During this reporting period, the primary focus for the ACCP Demonstration Project team was to expand SynCoal market awareness and acceptability for both the products and the technology. The ACCP Project team continued to focus on improving the operation, developing commercial markets, and improving the SynCoal products as well as the product`s acceptance.

  5. Advanced Coal Conversion Process Demonstration Project. Technical progress report, January 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from January 1, 1993, through December 31, 1993. This project demonstrates an advanced, thermal, coal drying process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low- rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal{reg_sign} process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, and volatile sulfur compounds. After thermal processing, the coal is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal. Rosebud SynCoal Partnership`s ACCP Demonstration Facility entered Phase III, Demonstration Operation, in April 1992 and operated in an extended startup mode through August 10, 1993, when the facility became commercial. Rosebud SynCoal Partnership instituted an aggressive program to overcome startup obstacles and now focuses on supplying product coal to customers. Significant accomplishments in the history of the SynCoal{reg_sign} process development are shown in Appendix A.

  6. PERFORMANCE OF BUS LANES IN SEOUL

    Directory of Open Access Journals (Sweden)

    Hyung Jin KIM

    2003-01-01

    In this paper, the performance impacts of reserved bus lanes in Seoul were evaluated and several suggestions for improving the effectiveness of the bus preferential treatment are proposed. The impacts of reserved bus lanes on both bus and auto performance were primarily measured by the relative speed changes of buses and autos and the average circulation rate of bus trips. Empirical results showed that the bus lanes were successful in improving average bus performance compared with other adjacent traffic. It was confirmed that right turning movement of the buses would cause the deterioration of bus speed in the curbside bus lanes. The average circulation rate of daily bus trips during the bus operation periods was somewhat increased by the bus lane introduction. A current warrant for reserved bus lanes in Korea was reviewed, and average bus speed during peak periods was proposed as a new warrant. In order to improve the effectiveness of the reserved bus lane, the type of lane markings in reserved bus lane, enforcement strategies for illegal parking in the bus lane and FIFO service at bus stops are discussed.

  7. Learning NServiceBus Sagas

    CERN Document Server

    Helton, Rich

    2015-01-01

    If you are an Enterprise C# developer who wishes to extend your knowledge of NServiceBus and Enterprise Service Bus in C#, this is the book for you. This book is designed to enhance the education of ESBs and their messaging, whether you are a beginner or a seasoned expert in Enterprise C#, Apex, and Visualforce pages.

  8. Waste Energy Recovery from Natural Gas Distribution Network: CELSIUS Project Demonstrator in Genoa

    Directory of Open Access Journals (Sweden)

    Davide Borelli

    2015-12-01

    Full Text Available Increasing energy efficiency by the smart recovery of waste energy is the scope of the CELSIUS Project (Combined Efficient Large Scale Integrated Urban Systems. The CELSIUS consortium includes a world-leading partnership of outstanding research, innovation and implementation organizations, and gather competence and excellence from five European cities with complementary baseline positions regarding the sustainable use of energy: Cologne, Genoa, Gothenburg, London, and Rotterdam. Lasting four-years and coordinated by the City of Gothenburg, the project faces with an holistic approach technical, economic, administrative, social, legal and political issues concerning smart district heating and cooling, aiming to establish best practice solutions. This will be done through the implementation of twelve new high-reaching demonstration projects, which cover the most major aspects of innovative urban heating and cooling for a smart city. The Genoa demonstrator was designed in order to recover energy from the pressure drop between the main supply line and the city natural gas network. The potential mechanical energy is converted to electricity by a turboexpander/generator system, which has been integrated in a combined heat and power plant to supply a district heating network. The performed energy analysis assessed natural gas saving and greenhouse gas reduction achieved through the smart systems integration.

  9. California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Glen; Atkinson, Barbara; Rhyne, Ivin

    2009-09-09

    Wastewater treatment is an energy-intensive process and electricity demand is especially high during the utilities summer peak electricity demand periods. This makes wastewater treatment facilities prime candidates for demand response programs. However, wastewater treatment is often peripheral to food processing operations and its demand response opportunities have often been overlooked. Phase I of this wastewater demonstration project monitored wastewater energy and environmental data at Bell-Carter Foods, Inc., California's largest olive processing plant. For this monitoring activity the project team used Green Energy Management System (GEMS) automated enterprise energy management (EEM) technologies. This report presents results from data collected by GEMS from September 15, 2008 through November 30, 2008, during the olive harvest season. This project established and tested a methodology for (1) gathering baseline energy and environmental data at an industrial food-processing plant and (2) using the data to analyze energy efficiency, demand response, daily peak load management, and environmental management opportunities at the plant. The Phase I goals were to demonstrate the measurement and interrelationship of electricity demand, electricity usage, and water quality metrics and to estimate the associated CO{sub 2} emissions.

  10. Virginia Demonstration Project Encouraging Middle School Students in Pursuing STEM Careers

    Science.gov (United States)

    Bachman, Jane T.; Kota, Dena H.; Kota, Aaron J.

    2011-01-01

    Encouraging students at all grade levels to consider pursuing a career in Science, Technology, Engineering, and Mathematics (STEM) fields i s a national focus. In 2005, the Naval Surface Warfare Center, Dahlgren Division (NSWCDD), a Department of Defense laboratory located in Da hlgren, Virginia, began work on the Virginia Demonstration Project (VDP) with the goal of increasing more student interest in STEM educatio n and pursuing STEM careers. This goal continues as the program enters its sixth year. This project has been successful through the partici pation of NSWCDD's scientists and engineers who are trained as mentor s to work in local middle school classrooms throughout the school year, As an extension of the in-class activities, several STEM summer aca demies have been conducted at NSWCDD, These academies are supported by the Navy through the VDP and the STEM Learning Module Project. These projects are part of more extensive outreach efforts offered by the National Defense Education Program (NDEP), sponsored by the Director, Defense Research and Engineering. The focus of this paper is on the types of activities conducted at the summer academy, an overview of the academy planning process, and recommendations to help support a nati onal plan of integrating modeling and simulation-based engineering and science into all grade levels. based upon the lessons learned

  11. Implementing chronic disease self-management in community settings: lessons from Australian demonstration projects.

    Science.gov (United States)

    Francis, Caitlin F; Feyer, Anne-Marie; Smith, Ben J

    2007-11-01

    The evaluation of the Sharing Health Care Initiative addressed the translation of different models of chronic disease self-management into health and community service contexts in Australia. Across seven projects, four intervention models were adopted: (1) the Stanford Chronic Disease Self Management course; (2) generic disease management planning, training and support; (3) tailored disease management planning, training and support, and; (4) telephone coaching. Targeted recruitment through support groups and patient lists was most successful for reaching high-needs clients. Projects with well developed organisational structures and health system networks demonstrated more effective implementation. Engagement of GPs in recruitment and client support was limited. Future self-management programs will require flexible delivery methods in the primary health care setting, involving practice nurses or the equivalent. After 12 months there was little evidence of potential sustainability, although structures such as consumer resource centres and client support clubs were established in some locations. Only one project was able to use Medicare chronic disease-related items to integrate self-management support into routine general practice. Participants in all projects showed improvements in self-management practices, but those receiving Model 3, flexible and tailored support, and Model 4, telephone coaching, reported the greatest benefits.

  12. Task 27 -- Alaskan low-rank coal-water fuel demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    Development of coal-water-fuel (CWF) technology has to-date been predicated on the use of high-rank bituminous coal only, and until now the high inherent moisture content of low-rank coal has precluded its use for CWF production. The unique feature of the Alaskan project is the integration of hot-water-drying (HWD) into CWF technology as a beneficiation process. Hot-water-drying is an EERC developed technology unavailable to the competition that allows the range of CWF feedstock to be extended to low-rank coals. The primary objective of the Alaskan Project, is to promote interest in the CWF marketplace by demonstrating the commercial viability of low-rank coal-water-fuel (LRCWF). While commercialization plans cannot be finalized until the implementation and results of the Alaskan LRCWF Project are known and evaluated, this report has been prepared to specifically address issues concerning business objectives for the project, and outline a market development plan for meeting those objectives.

  13. Fuel Gas Demonstration Plant Program: Small-Scale Industrial Project. Demonstration plant design and economic evaluation, Phase I. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    The Fuel Gas Demonstration Plant Program envisions a coal gasification facility to provide low Btu gas to the Erie Mining Company taconite pelletizing operations at Hoyt Lakes, Minnesota. Initially, it will consist of a Demonstration Plant which will be sized to supply 7.4 billion Btu (HHV) of fuel energy per day, which is approximately 37% of the Erie Mining Company's daily energy requirement for the induration of pellets. The Demonstration Plant will be designed to permit ultimate expansion to a Commercial Plant capable of supplying the entire fuel gas requirement of the pellet plant. Erie Mining Company is one of the largest producers of iron ore pellets in the United States. Its plant consists of 27 shaft furnaces with an annual production capacity of 10.3 million tons. The furnaces now operate on natural gas and use ful oil as a backup energy supply. Fuel consumption is normally equivalent to 20 billion Btu per day. The contract arrangement between the Department of Energy and Erie Mining Company provides mutually advantageous opportunity and means for: employing coal gasification technology and equipment which is now commercially available, for production and use of low Btu gas in an industrial environment under actual operating conditions; identifying, defining and resolving problems and operational unknowns that have heretofore retarded industrial use of synthetic gas; establishing parameters for retrofitting existing industrial furnaces for use of low Btu gas; and determining and demonstrating the technical and economic feasibility of the proposed scheme.

  14. Industrial- and utility-scale coal-water fuel demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Hathi, V. [Science Applications International Corp., Pittsburgh, PA (United States); Ramezan, M. [Burns and Roe Services Corp., Pittsburgh, PA (United States); Winslow, J. [USDOE Pittsburgh Energy Technology Center, PA (United States)

    1993-01-01

    Laboratory-, pilot-, and large-scale CWF combustion work has been performed primarily in Canada, China, Italy, Japan, Korea, Sweden, and the United States, and several projects are still active. Sponsors have included governments, utilities and their research arms, engine manufacturers, equipment suppliers, and other organizations in attempts to show that CWF is a viable alternative to premium fuels, both in cost and performance. The objective of this report is to present brief summaries of past and current industrial- and utility-scale CWF demonstrations in order to determine what lessons can be learned from these important, highly visible projects directed toward the production of steam and electricity. Particular emphasis is placed on identifying the CWF characteristics; boiler type, geometry, size, and location; length of the combustion tests; and the results concerning system performance, including emissions.

  15. Demonstration of a Basis for Tall Wind Turbine Design, EUDP Project Final Report

    DEFF Research Database (Denmark)

    Natarajan, Anand; Dimitrov, Nikolay Krasimirov; Madsen, Peter Hauge;

    Wind turbine design using calibrated wind models have been proposed to be used in conjunction with load cases which lead to reduced uncertainties in the design of wind turbines with hub heights above 60m. These recommended wind profiles have been made for shear, wind directional change...... and turbulence. The wind turbulence models used in the loads simulations have been calibrated so that their model parameters reflect the atmospheric stability conditions and the quantile of turbulence intensity considered. Consequently large multi megawatt turbines being designed today can benefit from...... these more advanced wind inflow models. A revision of the IEC 61400-1standard is being developed and has incorporated some of the recommendations made from this project.This project demonstrated the impact of wind models by simulating wind turbine loads based on high frequency wind measurements taken between...

  16. Technical support to the Solvent Refined Coal (SRC) demonstration projects: assessment of current research and development

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, M.S.; Rodgers, B.R.; Brown, C.H.; Carlson, P.K.; Gambill, W.R.; Gilliam, T.M.; Holmes, J.M.; Krishnan, R.P.; Parsly, L.F.

    1980-12-01

    A program to demonstrate Solvent Refined Coal (SRC) technology has been initiated by the US Department of Energy (DOE) in partnership with two industrial groups. Project management responsibility has been assigned to the Oak Ridge Operations Office (ORO) of DOE. ORO requested that the Oak Ridge National Laboratory assess current research and development (R and D) activities and develop recommendations for those activities that might contribute to successful completion of the SRC demonstration plant projects. The objectives of this final report are to discuss in detail the problem areas in SRC; to discuss the current and planned R and D investigations relevant to the problems identified; and to suggest appropriate R and D activities in support of designs for the SRC demonstration plants. Four types of R and D activities are suggested: continuation of present and planned activities; coordination of activities and results, present and proposed; extension/redirection of activities not involving major equipment purchase or modifications; and new activities. Important examples of the first type of activity include continuation of fired heater, slurry rheology, and slurry mixing studies at Ft. Lewis. Among the second type of activity, coordination of data acquisition and interpretation is recommended in the areas of heat transfer, vapor/liquid equilibria, and physical properties. Principal examples of recommendations for extension/redirection include screening studies at laboratory scale on the use of carbonaceous precoat (e.g., anthracite) infiltration, and 15- to 30-day continuous tests of the Texaco gasifier at the Texaco Montebello facility (using SRC residues).

  17. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Filbert, Wolfgang; Herold, Philipp [DBE Technology GmbH, Peine (Germany)

    2015-07-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  18. Project to demonstrate potential energy savings from industrial customers. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    The full potential for electric load management was determined with respect to the industrial sector by adopting direct load management techniques. Certain options available to regulatory authorities and individual utilities to conserve energy are highlighted. By conducting a demonstration project on a representative sample of primary industrial customers, information could be obtained on the potential impact of direct load management methods and other end-use conservation programs on a system-wide basis or multi-system-wide basis. The study was conducted by the Michigan Public Service Commission in cooperation with the Detroit Edison Company.

  19. Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

    Energy Technology Data Exchange (ETDEWEB)

    Scaglione, John M [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce Balkcom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

  20. Idaho Nuclear Technology and Engineering Center Newly Generated Liquid Waste Demonstration Project Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Herbst, A.K.

    2000-02-01

    A research, development, and demonstration project for the grouting of newly generated liquid waste (NGLW) at the Idaho Nuclear Technology and Engineering Center is considered feasible. NGLW is expected from process equipment waste, decontamination waste, analytical laboratory waste, fuel storage basin waste water, and high-level liquid waste evaporator condensate. The potential grouted waste would be classed as mixed low-level waste, stabilized and immobilized to meet RCRA LDR disposal in a grouting process in the CPP-604 facility, and then transported to the state.

  1. Micellar-polymer joint demonstration project, Wilmington Field, California. Third annual report, June 1978-July 1979

    Energy Technology Data Exchange (ETDEWEB)

    Staub, H.L.

    1981-08-01

    The micellar-polymer demonstration project to be conducted - through the design phase - in the HXa sand of Wilmington Field is proceeding satisfactorily but has fallen behind schedule. Results of some core floods were unsatisfactory. The recovery efficiencies were much lower than those achieved using the laboratory sample cosurfactant final design slug. Nearly six months of reformulating and additional core testing were required to finally achieve satisfactory laboratory results. Other laboratory tests were performed to optimize the polymer buffer for size and concentration. Other reservoir and reservoir fluid problems have been encountered in production and injection operations during the pre-flush period.

  2. Elder mediation in theory and practice: study results from a national caregiver mediation demonstration project.

    Science.gov (United States)

    Crampton, Alexandra

    2013-01-01

    Mediation is a process through which a third party facilitates discussion among disputing parties to help them identify interests and ideally reach an amicable solution. Elder mediation is a growing subspecialty to address conflicts involving older adults, primarily involving caregiving or finances. Mediation is theorized to empower participants but critics argue that it can exacerbate power imbalances among parties and coerce consensus. These contested claims are examined through study of a national caregiver mediation demonstration project. Study implications underscore the importance of gerontological social work expertise to ensure the empowerment of vulnerable older adults in mediation sessions.

  3. Technical elements, demonstration projects, and fiscal models in Medicaid managed care for people with developmental disabilities.

    Science.gov (United States)

    Kastner, T A; Walsh, K K; Criscione, T

    1997-08-01

    We presented a general model of the structure and functioning of managed care and described elements (provider networks, fiscal elements, risk estimation, case-mix, management information systems, practice parameters, and quality improvement) critical to service delivery for people with developmental disabilities. A number of technical elements of managed care systems were delineated and reviewed in relation to the inclusion of people with developmental disabilities. Several managed care demonstration projects were described and, finally, a multi-year hypothetical budget model, including long-term care, was presented as a framework for considering how managed care affects specific service structures. Implications for people with developmental disabilities were discussed.

  4. The Role of Occupant Behavior in Achieving Net Zero Energy: A Demonstration Project at Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Judd, Kathleen S.; Sanquist, Thomas F.; Zalesny, Mary D.; Fernandez, Nicholas

    2013-09-30

    This study, sponsored by the U.S. General Services Administration’s Office of Federal High-Performance Green Buildings, aimed to understand the potential for institutional and behavioral change to enhance the performance of buildings, through a demonstration project with the Department of Defense in five green buildings on the Fort Carson, Colorado, Army base. To approach this study, the research team identified specific occupant behaviors that had the potential to save energy in each building, defined strategies that might effectively support behavior change, and implemented a coordinated set of actions during a three-month intervention.

  5. FY results for the Los Alamos large scale demonstration and deployment project

    Energy Technology Data Exchange (ETDEWEB)

    Stallings, E.; McFee, J. [and others

    2000-11-01

    The Los Alamos Large Scale Demonstration and Deployment Project (LSDDP) in support of the US Department of Energy (DOE) Deactivation and Decommissioning Focus Area (DDFA) is identifying and demonstrating technologies to reduce the cost and risk of management of transuranic element contaminated large metal objects, i.e. gloveboxes. DOE must dispose of hundreds of gloveboxes from Rocky Flats, Los Alamos and other DOE sites. Current practices for removal, decontamination and size reduction of large metal objects translates to a DOE system-wide cost in excess of $800 million, without disposal costs. In FY99 and FY00 the Los Alamos LSDDP performed several demonstrations on cost/risk savings technologies. Commercial air pallets were demonstrated for movement and positioning of the oversized crates in neutron counting equipment. The air pallets are able to cost effectively address the complete waste management inventory, whereas the baseline wheeled carts could address only 25% of the inventory with higher manpower costs. A gamma interrogation radiography technology was demonstrated to support characterization of the crates. The technology was developed for radiography of trucks for identification of contraband. The radiographs were extremely useful in guiding the selection and method for opening very large crated metal objects. The cost of the radiography was small and the operating benefit is high. Another demonstration compared a Blade Cutting Plunger and reciprocating saw for removal of glovebox legs and appurtenances. The cost comparison showed that the Blade Cutting Plunger costs were comparable, and a significant safety advantage was reported. A second radiography demonstration was conducted evaluation of a technology based on WIPP-type x-ray characterization of large boxes. This technology provides considerable detail of the contents of the crates. The technology identified details as small as the fasteners in the crates, an unpunctured aerosol can, and a vessel

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. Heber geothermal binary demonstration project quarterly technical progress report, October 1, 1981--December 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, R.G.; Allen, R.F.; Alsup, R.A.; Liparidis, G.S.; Van De Mark, G.D.

    1983-08-01

    The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1981, through December 31, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

  8. Progress on Fuel Receiving and Storage Decontamination Work at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Jablonski, J. F.; Al-Daouk, A. M.; Moore, H. R.

    2003-02-25

    The West Valley Demonstration Project (WVDP) removed the last of its spent nuclear fuel assemblies from an on-site storage pool last year and is now decontaminating its Fuel Receiving and Storage (FRS) Facility. The decontamination project will reduce the long-lived curie inventory, associated radiological hazards, and the operational costs associated with the maintenance of this facility. Workers at the WVDP conducted the first phase of the FRS decontamination project in late 2001 by removing 149 canisters that previously contained spent fuel assemblies from the pool. Removal of the canisters from the pool paved the way for nuclear divers to begin removing canister storage racks and other miscellaneous material from the FRS pool in February 2002. This was only the third time in the history of the WVDP that nuclear divers were used to perform underwater work. After decontaminating the pool, it will be drained slowly until all of the water is removed. The water will be processed through an ion exchanger to remove radioactive contaminants as it is being drained, and a fixative will be applied to the walls above the water surface to secure residual contamination.

  9. Documentation of the Range 8C rehabilitation demonstration project at Hohenfels Training Area, West Germany

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Carter, R.P.; Severinghaus, W.D.; Lacey, R.M.; Brent, J.J.

    1987-03-01

    Continued and intensive tactical training for the last 35 years at the Hohenfels Training Area (HTA), Federal Republic of Germany, has resulted in extensive environmental damage and reduced training realism. The US Corps of Engineers Construction Engineering Research Laboratory is developing an Integrated Training Area Management (ITAM) Program for the Seventh Army Training Command for use at HTA. Argonne National Laboratory was asked to assist in one element of the ITAM program, a training range rehabilitation demonstration project. The rehabilitation project was begun in 1986 on a 62-ha watershed that included about 16 ha of meadow with training damage typical of HTA. On the basis of amount of plant ground cover, type and degree of erosion, and soil properties, 10 rehabilitation prescriptions were developed to reestablish plant cover, control erosion, and improve training realism. Prescriptions were installed by a local contractor in September 1986. A monitoring program is under way to determine the effectiveness of this effort. Results and experience gained from this project will be used in the ITAM program and for rehabilitation training courses conducted at HTA.

  10. Recent Trend of New Type Power Delivery System and its Demonstrative Project in Japan

    Science.gov (United States)

    Morozumi, Satoshi; Nara, Koichi

    Recently many such distributed generating systems as co-generation, photovoltaic, wind, fuel cells etc. are introduced into power distribution system, and the power system must cope with the situation with distributed generators. Moreover, such industries as IT request reliable and high quality power to preserve their businesses, and some other electric energy based industries request less reliable but cheaper electricity. From these backgrounds, several new type power delivery systems are emerging where lots of distributed generators (DGs) can be connected and many benefits offered by DGs can be realized without affecting the existing power system. They are referred to various names. In U.S.A., Microgrid, Power Park and Virtual Utilities, etc. are proposed. In Europe, DISPOWER or Smart Grid is under developing. In Japan, FRIENDS and Demand Area Network System etc. are proposed and tested in real sites. In this paper, first, general concepts of such new type power delivery systems and new businesses expected to be created by using DGs are introduced. Then, recent research activities in this area in Japan are introduced so as to stimulate new business opportunities. In the later part of this paper, related NEDO's demonstrative projects are introduced. NEDO is the largest public R&D management organization and promoting several projects regarding grid connecting issues on the power system. Those projects were planned to solve several problems on the power system where distributed renewable energy resources are installed.

  11. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  12. Teaching professionalism within a community context: perspectives from a national demonstration project.

    Science.gov (United States)

    O'Toole, Thomas P; Kathuria, Navneet; Mishra, Mahita; Schukart, Daniela

    2005-04-01

    Most medical schools now include some component of professionalism in their curriculum, ranging from "white coat" ceremonies to didactic and small-group, case-based discussions. Often this format does not provide a context for the course content nor does it necessarily make the curricular themes relevant to population groups and communities most vulnerable to the inequities and injustices present in health care. The authors describe a community-based professionalism curriculum for preclinical and clinical year medical students and report evaluation data from three years (2001-2003) of this national demonstration project. The curriculum emphasized four themes: service, community, advocacy, and ethical behavior and was based on a service-learning pedagogy applied within community-based organizations. As part of the program evaluation, 95 students from 33 medical schools between the years 2001 and 2003 (response rate: 84.8%) completed an anonymous questionnaire. When asked what did they learn about professionalism that they did not learn (or expect to learn) in their medical school curriculum, the most common themes were (1) factors and influences affecting professional behavior, with many specifically citing pharmaceutical companies and insurance carriers (46.3%); (2) the role and importance of physician advocacy on behalf of their patients (37.9%); and (3) issues specific to the needs of vulnerable and disadvantaged populations (20.0%). This project demonstrates that community-based experiences can provide unique and relevant learning in a professionalism curriculum that can complement existing medical-school-based efforts.

  13. Solar hot water demonstration project at Red Star Industrial Laundry, Fresno, California

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    The Final Report of the Solar Hot Water System located at the Red Star Industrial Laundry, 3333 Sabre Avenue, Fresno, California, is presented. The system was designed as an integrated wastewater heat recovery and solar preheating system to supply a part of the hot water requirements. It was estimated that the natural gas demand for hot water heating could be reduced by 56 percent (44 percent heat reclamation and 12 percent solar). The system consists of a 16,500 gallon tube-and-shell wastewater heat recovery subsystem combined with a pass-through 6,528 square foot flat plate Ying Manufacturing Company Model SP4120 solar collector subsystem, a 12,500 gallon fiber glass water storage tank subsystem, pumps, heat exchangers, controls, and associated plumbing. The design output of the solar subsystem is approximately 2.6 x 10/sup 9/ Btu/year. Auxiliary energy is provided by a gas fired low pressure boiler servicing a 4,000 gallon service tank. This project is part of the US Department of Energy's Solar Demonstration Program with DOE sharing $184,841 of the $260,693 construction cost. The system was turned on in July 1977, and acceptance tests completed in September 1977. The demonstration period for this project ends September 2, 1982.

  14. Big Muddy Field Low-Tension Flood Demonstration Project. Third annual report, April 1980-March 1981

    Energy Technology Data Exchange (ETDEWEB)

    Davis, J.G.; Ferrell, H.H.; Stewart, W.C.

    1981-11-01

    Objectives of the project are: evaluate a commercial-scale field test using cost-optimized chemical slug size and composition; field test a surfactant system which could be made available in commercial quantities; demonstrate oil recovery effectiveness in multiple patterns; and demonstrate the feasibility of applying a low-tension process to low-permeability sands by using propped fractures in injection and producing wells. The first annual report dealt primarily with drilling, formation evaluation, and preliminary plant design. The second annual report emphasized plant construction and completion of laboratory work to specify the chemicals needed for the project. This report discusses the project operation during the preflush and problems arising during start-up of chemical injection. The most significant operating problem during the preflush was failure of the monel filter screens due to chlorine attack. The monel screens were replaced with polyester cloth screens. The cloth screens worked very well filtering the preflush water. After a short term test in which the 200-square-foot filter showed that the cloth screens would also filter the polymer, polyester cloth screens were ordered as replacement screens for the 800-square-foot product filter. All of the construction and installation necessary for the chemical phase handling and blending were completed, individual components were checked out, and the low-tension slug injection was scheduled to begin the latter half of January. In spite of the preparation, low-tension slug injection has been delayed because of continued faulty filter operation. The exact cause of the erratic filter operation is still being evaluated.

  15. Big Muddy Field Low-Tension Flood Demonstration Project. Sixth annual report, April 1983-March 1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The Big Muddy low-tension flood is a commercial-size demonstration project consisting of nine 10-acre injection patterns in the heart of the Big Muddy Oil Field located 15 miles east of Casper, Wyoming. The main goal of the project is to provide data for commercialization of the process for the Big Muddy Field and similar Wyoming and Colorado fields. Other objectives are discussed in previous annual reports. This report discusses the project performance during the polymer drive phase with emphasis on the analyses of oil cut, pattern balance, and early tracer response. The oil rate increased only slightly during 1983 and began to flatten near year-end at about 210 barrels per day or 12% of the injection rate. The injection rate was increased in late 1982 and early 1983 but simply resulted in a net input (influx plus injection) greater than production with only slight improvement in oil rate. In fact, the imbalance is suspected of contributing to the early flattening in oil production. Though the project oil rate flattened, an increased cut was observed in the north row of wells, indicating an oil response to slug injection in all wells except Well 54. Also during 1983, the polymer drive volume increased to about 10% of pore volume or to the midpoint of the polymer drive. Tracer and slug components have still appeared in only a few wells, even after 20% pore volume injection. Oil treating was becoming more troublesome but was relieved when the new treating facility was put into use. 5 references, 91 figures, 7 tables.

  16. The Myth of the "Ideal Bus"

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ Does as an ideal bus technology exist? Many companies have and will promote a single technology as the ideal bus that will meet all application needs, but in actuality, each bus technology has its own strengths and weaknesses and thus is appropriate for different applications. History has shown the folly of claiming an ideal bus for every application.

  17. High-Speed Ring Bus

    Science.gov (United States)

    Wysocky, Terry; Kopf, Edward, Jr.; Katanyoutananti, Sunant; Steiner, Carl; Balian, Harry

    2010-01-01

    The high-speed ring bus at the Jet Propulsion Laboratory (JPL) allows for future growth trends in spacecraft seen with future scientific missions. This innovation constitutes an enhancement of the 1393 bus as documented in the Institute of Electrical and Electronics Engineers (IEEE) 1393-1999 standard for a spaceborne fiber-optic data bus. It allows for high-bandwidth and time synchronization of all nodes on the ring. The JPL ring bus allows for interconnection of active units with autonomous operation and increased fault handling at high bandwidths. It minimizes the flight software interface with an intelligent physical layer design that has few states to manage as well as simplified testability. The design will soon be documented in the AS-1393 standard (Serial Hi-Rel Ring Network for Aerospace Applications). The framework is designed for "Class A" spacecraft operation and provides redundant data paths. It is based on "fault containment regions" and "redundant functional regions (RFR)" and has a method for allocating cables that completely supports the redundancy in spacecraft design, allowing for a complete RFR to fail. This design reduces the mass of the bus by incorporating both the Control Unit and the Data Unit in the same hardware. The standard uses ATM (asynchronous transfer mode) packets, standardized by ITU-T, ANSI, ETSI, and the ATM Forum. The IEEE-1393 standard uses the UNI form of the packet and provides no protection for the data portion of the cell. The JPL design adds optional formatting to this data portion. This design extends fault protection beyond that of the interconnect. This includes adding protection to the data portion that is contained within the Bus Interface Units (BIUs) and by adding to the signal interface between the Data Host and the JPL 1393 Ring Bus. Data transfer on the ring bus does not involve a master or initiator. Following bus protocol, any BIU may transmit data on the ring whenever it has data received from its host. There

  18. SunLine Transit Agency Advanced Technology Fuel Cell Bus Evaluation: Fourth Results Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, L.; Chandler, K.

    2013-01-01

    SunLine Transit Agency, which provides public transit services to the Coachella Valley area of California, has demonstrated hydrogen and fuel cell bus technologies for more than 10 years. In May 2010, SunLine began demonstrating the advanced technology (AT) fuel cell bus with a hybrid electric propulsion system, fuel cell power system, and lithium-based hybrid batteries. This report describes operations at SunLine for the AT fuel cell bus and five compressed natural gas buses. The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) is working with SunLine to evaluate the bus in real-world service to document the results and help determine the progress toward technology readiness. NREL has previously published three reports documenting the operation of the fuel cell bus in service. This report provides a summary of the results with a focus on the bus operation from February 2012 through November 2012.

  19. Large-scale demonstration and deployment project at Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Brown, S.; McFee, J. [IT Corp. (United States); Broom, C. [Florida International Univ., Miami, FL (United States); Dugger, H. [ICF Inc. (United States); Stallings, E. [Los Alamos National Lab., NM (United States)

    1999-04-01

    Established by the US Department of Energy (DOE) Environmental Management program through its Office of Science and Technology, the Deactivation and Decommissioning Focus Area is developing answers to the technological problems that hinder Environmental Management`s extensive cleanup efforts. The optimized application of technologies to ongoing nuclear facility decontamination and dismantlement is critical in meeting the challenge of decommissioning approximately 9,000 buildings and structures within the DOE complex. The significant technical and economic concerns in this area underscore a national imperative for the qualification and timely delivery of cost-reduction technologies and management approaches to meet federal and private needs. At Los Alamos National Laboratory (LANL), a Large-Scale Demonstration and Deployment Project (LSDDP) has been established to facilitate demonstration and deployment of technologies for the characterization, decontamination, and volume reduction of oversized metallic waste, mostly in the form of gloveboxes contaminated with transuranic radionuclides. The LANL LSDDP is being managed by an integrated contractor team (ICT) consisting of IT Corporation, ICF Incorporated, and Florida International University and includes representation from LANL`s Environmental Management Program Office. The ICT published in the Commerce Business Daily a solicitation for interest for innovative technologies capable of improving cost and performance of the baseline process. Each expression of interest response was evaluated and demonstration contract negotiations are under way for those technologies expected to be capable of meeting the project objectives. This paper discusses management organization and approach, the results of the technology search, the technology selection methodology, the results of the selection process, and future plans for the program.

  20. Scaling Laws in Chennai Bus Network

    CERN Document Server

    Chatterjee, Atanu

    2015-01-01

    In this paper, we study the structural properties of the complex bus network of Chennai. We formulate this extensive network structure by identifying each bus stop as a node, and a bus which stops at any two adjacent bus stops as an edge connecting the nodes. Rigorous statistical analysis of this data shows that the Chennai bus network displays small-world properties and a scale-free degree distribution with the power-law exponent, $\\gamma > 3$.

  1. SCHOOL BUS GARAGES, 1966 REVISION.

    Science.gov (United States)

    JOHNSON, HERBERT F.

    STANDARDS AND RECOMMENDATIONS ARE GIVEN FOR THE DESIGN AND CONSTRUCTION OF SCHOOL BUS GARAGES INCLUDING BRIEF DISCUSSIONS OF--(1) SITE DEVELOPMENT, (2) DESIGN AND CONSTRUCTION, AND (3) MECHANICAL (HEATING, PLUMBING, AND VENTILATION) AND ELECTRICAL FACTORS. (JT)

  2. ACSEPT a European project for a new step in the future demonstration of advanced fuel processing

    Energy Technology Data Exchange (ETDEWEB)

    Bourg, S.; Hill, C. [CEA, DRCP - Bat 181, CEA Marcoule, BP17171, 30207 Bagnols/Ceze (France); Caravaca, C.; Espartero, A. [CIEMAT, Avda. Complutense, 22 - 28040 Madrid (Spain); Rhodes, C.; Taylor, R.; Harrison, M. [National Nuclear Laboratory, Sellafield, Seascale, Cumbria, CA20 1PG (United Kingdom); EKBERG, C. [Chalmers tekniska hoegskola, Institutionen foer kemi- och bioteknik, Aemnesomraadets namn, 412 96 Goeteborg (Sweden); GEIST, A. [Forschungszentrum Karlsruhe, Institut fuer Nukleare Entsorgungstechnik, P.O.B. 3640, D-76021 Karlsruhe (Germany); Modolo, G. [Forschungszentrum Juelich - FZJ, D-52425 Juelich (Germany); Cassayre, L. [CNRS, Laboratoire de Genie Chimique, Toulouse (France); Malmbeck, R. [JRC-ITU, Karlsruhe (Germany); De Angelis, G. [ENEA, Casaccia, Rome (Italy); Bouvet, S. [Rio Tinto Alcan, Centre de Recherche de Voreppe, Voreppe (France); Klaassen, F. [NRG, PO Box 25, NL-1755 ZG Petten (Netherlands)

    2010-07-01

    For more than fifteen years, a European scientific community has joined its effort to develop and optimise processes for the partitioning of actinides from fission products. In an international context of 'nuclear renaissance', the upcoming of a new generation of nuclear reactor (Gen IV) will require the development of associated advanced closed fuel cycles which answer the needs of a sustainable nuclear energy: the minimization of the production of long lived radioactive waste but also the optimization of the use of natural resources with an increased resistance to proliferation. Actually, Partitioning and Transmutation (P and T), associated to a multi-recycling of all transuranics (TRUs), should play a key role in the development of this sustainable nuclear energy. By joining together 34 Partners coming from European universities, nuclear research bodies and major industrial players in a multidisciplinary consortium, the FP7 EURATOM-Fission Collaborative Project ACSEPT (Actinide recycling by Separation and Transmutation), started in 2008 for four year duration, provides the sound basis and fundamental improvements for future demonstrations of fuel treatment in strong connection with fuel fabrication techniques. Consistently with potentially viable recycling strategies, ACSEPT therefore provides a structured R and D framework to develop chemical separation processes compatible with fuel fabrication techniques, with a view to their future demonstration at the pilot level. ACSEPT is organized into three technical domains: (i) Considering technically mature aqueous separation processes, ACSEPT works to optimize and select the most promising ones dedicated either to actinide partitioning or to group actinide separation. (ii) Concerning high temperature pyrochemical separation processes, ACSEPT focuses on the enhancement of the two reference cores of process selected within previous projects. R and D efforts are now devoted to key scientific and technical

  3. ACSEPT, a European project for a new step in the future demonstration of advanced fuel processing

    Energy Technology Data Exchange (ETDEWEB)

    Bourg, S. [CEA Marcoule 30 (France); Hill, C. [CEA Saclay, 91 - Gif sur Yvette (France); Caravaca, C.; Espartero, A. [Ciemat, Madrid (Spain); Rhodes, C.; Taylor, R.; Harrison, M. [National Nuclear Laboratory (United Kingdom); Geist, A. [Fachinformationszentrum Karlsruhe - INE (Germany); Modolo, G. [Forschungszentrum Juelich - FZJ (Germany); Cassayre, L. [Centre National de la Recherche Scientifique (CNRS), 91 - Orsay (France); Malmbeck, R. [Joint Research Centre (JRC) - Institute for Transuranium Elements (ITU) (Germany); De Angelis, G. [ENEA, Bologna (Italy); Bouvet, S. [Alcan, 92 - Courbevoie (France); Klaassen, F. [Nuclear Research and consultancy Group (NRG) (Netherlands); Ekber, C.

    2010-11-15

    Partitioning and transmutation, associated to a multi-recycling of all transuranics should play a key role in the development of sustainable nuclear energy. By joining together 34 partners coming from European universities, nuclear research laboratories and major industrial players, in a multi-disciplinary consortium, the FP7-Euratom-Fission collaborative project ACSEPT (Actinide recycling by separation and transmutation), provides the sound basis and future improvements for future demonstrations of fuel treatment in strong connection with fuel fabrication techniques. ACSEPT is organized into 3 technical domains: 1) selecting and optimizing mature aqueous separation processes (Diamex-Sanex, Ganex); 2) high temperature pyrochemical separation processes, and 3) carrying out engineering and systems studies on hydro- and pyro-chemical processes to prepare for future demonstration at a pilot level. After 2 years of work, 2 successful hot-tests were performed in hydrometallurgy, validating the Sanex and i-Sanex routes. Efforts are now devoted to the Ganex concept. Progress was also made in fuel dissolution and fuel re-fabrication. In pyrometallurgy, promising routes are almost demonstrated for the actinide recovery from aluminium. (A.C.)

  4. An Optimization Model for the Selection of Bus-Only Lanes in a City.

    Directory of Open Access Journals (Sweden)

    Qun Chen

    Full Text Available The planning of urban bus-only lane networks is an important measure to improve bus service and bus priority. To determine the effective arrangement of bus-only lanes, a bi-level programming model for urban bus lane layout is developed in this study that considers accessibility and budget constraints. The goal of the upper-level model is to minimize the total travel time, and the lower-level model is a capacity-constrained traffic assignment model that describes the passenger flow assignment on bus lines, in which the priority sequence of the transfer times is reflected in the passengers' route-choice behaviors. Using the proposed bi-level programming model, optimal bus lines are selected from a set of candidate bus lines; thus, the corresponding bus lane network on which the selected bus lines run is determined. The solution method using a genetic algorithm in the bi-level programming model is developed, and two numerical examples are investigated to demonstrate the efficacy of the proposed model.

  5. Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase - Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, David

    2012-06-29

    , and regenerative braking for battery charging. It uses a 19.3 kW Ballard PEM fuel cell, will store 12.6 kg of hydrogen at 350 Bar, and includes a 60 kWh battery storage system. The objectives of the project included the following: (a) To advance commercialization of hydrogen-powered transit buses and supporting infrastructure; (b) To provide public outreach and education by showcasing the operation of a 22-foot fuel cell hybrid shuttle bus and Texas first hydrogen fueling infrastructure; and (c) To showcase operation of zero-emissions vehicle for potential transit applications. As mentioned above, the project successfully demonstrated an early vehicle technology, the Ebus plug-in hybrid fuel cell bus, and that success has led to the acquisition of a more advanced vehicle that can take advantage of the same fueling infrastructure. Needed hydrogen station improvements have been identified that will enhance the capabilities of the fueling infrastructure to serve the new bus and to meet the transit agency needs. Over the course of this project, public officials, local government staff, and transit operators were engaged in outreach and education activities that acquainted them with the real world operation of a fuel cell bus and fueling infrastructure. Transit staff members in the Dallas/Ft. Worth region were invited to a workshop in Arlington, Texas at the North Central Texas Council of Governments to participate in a workshop on hydrogen and fuel cells, and to see the fuel cell bus in operation. The bus was trucked to the meeting for this purpose so that participants could see and ride the bus. Austin area transit staff members visited the fueling site in Austin to be briefed on the bus and to participate in a fueling demonstration. This led to further meetings to determine how a fuel cell bus and fueling station could be deployed at Capital Metro Transit. Target urban regions that expressed additional interest during the project in response to the outreach meetings and

  6. Role of demonstration projects in innovation: transition to sustainable energy and transport

    DEFF Research Database (Denmark)

    Klitkou, Antje; Coenen, Lars; Andersen, Per Dannemand

    2013-01-01

    from road transport, and climate changes caused by greenhouse gas emissions, all these crises have contributed to a sense of urgency in political statements on the need for transition towards a sustainable society. Politicians have developed different types of instruments to achieve a development...... towards more sustainability. However, the design and proper mix of such instruments is still to be better developed, as is the knowledge on possible effects of these instruments. This applies also on demonstration projects and programmes. This paper attempts to review two important strands on literature......Transition towards more sustainability has been on the agenda of politicians, researchers, industry and concerned societal actors for a number of years. The oil crisis in the 1970s, environmental concerns related to decreasing biodiversity, depleted natural resources, cities polluted by emissions...

  7. Plan for Demonstration of Online Monitoring for the Light Water Reactor Sustainability Online Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Magdy S. Tawfik; Vivek Agarwal; Nancy J. Lybeck

    2011-09-01

    Condition based online monitoring technologies and development of diagnostic and prognostic methodologies have drawn tremendous interest in the nuclear industry. It has become important to identify and resolve problems with structures, systems, and components (SSCs) to ensure plant safety, efficiency, and immunity to accidents in the aging fleet of reactors. The Machine Condition Monitoring (MCM) test bed at INL will be used to demonstrate the effectiveness to advancement in online monitoring, sensors, diagnostic and prognostic technologies on a pilot-scale plant that mimics the hydraulics of a nuclear plant. As part of this research project, INL will research available prognostics architectures and their suitability for deployment in a nuclear power plant. In addition, INL will provide recommendation to improve the existing diagnostic and prognostic architectures based on the experimental analysis performed on the MCM test bed.

  8. Solar heating and cooling demonstration project at the Florida Solar Energy Center

    Energy Technology Data Exchange (ETDEWEB)

    Hankins, J.D.

    1980-02-01

    The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. Information is provided on the system's test, operation, controls, hardware and installation, including detailed drawings. The Center's office building, approximately 5000 square feet of space, with solar air conditioning and heating as a demonstration of the technical feasibility is located just north of Port Canaveral, Florida. The system was designed to supply approximately 70% of the annual cooling and 100% of the heating load. The project provides unique high-temperature, non-imaging, non-tracking, evacuated-tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection.

  9. Monitoring and Evaluation of Environmental Flow Prescriptions for Five Demonstration Sites of the Sustainable Rivers Project

    Science.gov (United States)

    Konrad, Christopher P.

    2010-01-01

    The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.

  10. El Dorado Micellar-Polymer Demonstration Project third annual report, June 1976--August 1977

    Energy Technology Data Exchange (ETDEWEB)

    Rosenwald, G.W.; Miller, R.J.; Vairogs, J. (eds.)

    1978-02-01

    The primary objectives of this project are to determine the economic feasibility of improved oil recovery using two micellar-polymer processes and to determine the associated benefits and problems of each process. The El Dorado Demonstration Project is designed to allow a side-by-side comparison of two distinct micellar-polymer processes in the same field so that the reservoir conditions for the two floods are as nearly alike as possible. Selection of sulfonates and polymers for both patterns was completed. Salinity changes in produced fluids and in observation well samples have shown that breakthrough of preflush (or preflood) has occurred at some wells in both patterns. Observation well sampling and logging data showed that preflush arrived earlier at the observation wells in the north pattern than the south pattern. Injectivities of the micellar system designed for the south pattern and components of that system were tested in three monitoring wells. Similarly, extensive injectivity testing of the surfactant and polymer slugs designed for the north pattern was conducted using two monitoring wells. Recommended preflush volumes for the south pattern were revised to reflect corrections in reservoir data (primarily due to the lack of the upper zone at well MP-213). Reservoir pressure forecasts of the superposition-of-line-sources simulator were compared with observed monitoring well pressures. Injection of the chemical preflush for the south pattern began on June 20, 1976. The micellar fluid injection began in the south pattern on March 22, 1977. (LK)

  11. West Valley Demonstration Project site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  12. Treatment And Prevention for female Sex workers in South Africa: protocol for the TAPS Demonstration Project

    Science.gov (United States)

    Gomez, Gabriela B; Eakle, Robyn; Mbogua, Judie; Akpomiemie, Godspower; Venter, W D Francois; Rees, Helen

    2016-01-01

    Introduction Updated guidelines from the WHO recommend antiretroviral treatment for adults with HIV at any CD4 count and daily oral pre-exposure prophylaxis (PrEP) for people at substantial risk of HIV infection. However, implementation challenges may hinder the ability of programmes to translate these recommendations into successful practice. This demonstration project is the first to integrate PrEP and immediate treatment (ITx) for female sex workers (FSWs) in South Africa to answer operational research questions. Methods and analysis This is a prospective cohort study where the main outcome is retention at 12 months. The study population is recruited into two arms across two urban sites: (1) PrEP for HIV-negative FSWs (n=400) and (2) ITx for HIV-positive FSWs with CD4 greater than national guidelines (n=300). We investigate process and other health indicators, uptake and use of PrEP and ITx through qualitative research, and evaluate cost-effectiveness analysis combined with estimates of impact through epidemiological modelling. Ethics and dissemination The Treatment And Prevention for female Sex workers in South Africa (TAPS) Project was designed as an implementation study before emtricitabine/tenofovir disoproxil fumarate was licenced as an indication for PrEP in South Africa. Therefore, clinical trial requirements for ethical and South African Medicines Control Council approvals were followed. Results will be disseminated to participants, local health officials and other stakeholders, as well as in peer-reviewed journals and at conferences. PMID:27678533

  13. Development of derived investigation levels for use in internal dosimetry at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, P. [Pittsburgh Univ., PA (United States)

    1991-12-31

    The objective was to determine if the routine intemal dosimetry program at the West Valley Demonstration Project is capable of meeting the performance objective of 1 mSv annual effective dose equivalent due to internal contamination. With the use of the computer code REMedy the annual effective dose equivalent is calculated. Some of the radionuclides of concern result in an annual effective dose equivalent that exceeds the performance objective. Although the results exceed the performance objective, in all but two cases they do not exceed the US DOE regulatory limits. In these instances the Th-232 and Am-241 were determined to exceed the committed dose equivalent limit to their limiting tissue. In order to document the potential missed dose for regulatory compliance, Sr-90 is used as an indicator for Th-232. For Am-241 an investigation as to whether or not the minimum detectable amount can be lowered is performed. The derived investigation levels as a result of this project are 4.9E3 Bq/lung count for Co-60, 2.2E4 Bq/lung count for Cs-137, 1.9 Bq/1 for Sr-90 and for radionuclides other than Sr-90 any value greater than or equal to three standard deviations above their net count is considered to require further investigation.

  14. The research and demonstration of some major geological problems of Three Gorges Project%The research and demonstration of some major geological problems of Three Gorges Project

    Institute of Scientific and Technical Information of China (English)

    Chen Deji; Man Zuowu

    2011-01-01

    The research process, main contents, methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced, including dam site selection, regional tectonic stability and seismic activity, stability of reservoir bank and reservoir-induced earthquake. Meanwhile, the above mentioned engineering geological problems are evaluated according to the preliminary test results since TGP operation and impoundment in 2003.

  15. Fermilab Project X nuclear energy application: Accelerator, spallation target and transmutation technology demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Gohar, Yousry; /Argonne; Johnson, David; Johnson, Todd; Mishra, Shekhar; /Fermilab

    2011-04-01

    The recent paper 'Accelerator and Target Technology for Accelerator Driven Transmutation and Energy Production' and report 'Accelerators for America's Future' have endorsed the idea that the next generation particle accelerators would enable technological breakthrough needed for nuclear energy applications, including transmutation of waste. In the Fall of 2009 Fermilab sponsored a workshop on Application of High Intensity Proton Accelerators to explore in detail the use of the Superconducting Radio Frequency (SRF) accelerator technology for Nuclear Energy Applications. High intensity Continuous Wave (CW) beam from the Superconducting Radio Frequency (SRF) Linac (Project-X) at beam energy between 1-2 GeV will provide an unprecedented experimental and demonstration facility in the United States for much needed nuclear energy Research and Development. We propose to carry out an experimental program to demonstrate the reliability of the accelerator technology, Lead-Bismuth spallation target technology and a transmutation experiment of spent nuclear fuel. We also suggest that this facility could be used for other Nuclear Energy applications.

  16. Bitmap-Wise Wireless M-Bus Coordination for Sustainable Real Time Energy Management

    Directory of Open Access Journals (Sweden)

    Kwang-il Hwang

    2014-07-01

    Full Text Available Even though WM-Bus is being considered to be the most promising network protocol for smart metering, it is not suitable for a sustainable real-time home energy management system (HEMS, which requires higher reliability and longer lifetime despite real time bi-directional communications. Therefore, in this paper we propose a Bitmap-wise WM-Bus (BWM-Bus, coping well with sustainable real-time HEMS. In particular, the proposed scheme addresses the several problems in WM-Bus for HEMS by introducing novel functions: asynchronous meter trigger, adaptive slot scheduling, and bitmap-wise retransmission request. Through experiments, we demonstrate that BWM-Bus guarantees higher data success ratio with lower data aggregation time, as well as longer lifetime than WM-Bus standard.

  17. Wishbone bus Architecture - A Survey and Comparison

    CERN Document Server

    Sharma, Mohandeep; 10.5121/vlsic.2012.3210

    2012-01-01

    The performance of an on-chip interconnection architecture used for communication between IP cores depends on the efficiency of its bus architecture. Any bus architecture having advantages of faster bus clock speed, extra data transfer cycle, improved bus width and throughput is highly desirable for a low cost, reduced time-to-market and efficient System-on-Chip (SoC). This paper presents a survey of WISHBONE bus architecture and its comparison with three other on-chip bus architectures viz. Advanced Micro controller Bus Architecture (AMBA) by ARM, CoreConnect by IBM and Avalon by Altera. The WISHBONE Bus Architecture by Silicore Corporation appears to be gaining an upper edge over the other three bus architecture types because of its special performance parameters like the use of flexible arbitration scheme and additional data transfer cycle (Read-Modify-Write cycle). Moreover, its IP Cores are available free for use requiring neither any registration nor any agreement or license.

  18. X-38 Prototype Technology Demonstrator for the Crew Return Vehicle (CRV) and Project Managers Bob Ba

    Science.gov (United States)

    1999-01-01

    Bob Baron of the Dryden Flight Research Center (left) and Brian Anderson of the Johnson Space Flight Center (right) flank an X-38 prototype Crew Return Vehicle technology demonstrator under construction at the Johnson Space Center, Houston, Texas. The X-38 Crew Return Vehicle (CRV) research project is designed to develop the technology for a prototype emergency crew return vehicle, or lifeboat, for the International Space Station. The project is also intended to develop a crew return vehicle design that could be modified for other uses, such as a joint U.S. and international human spacecraft that could be launched on the French Ariane-5 Booster. The X-38 project is using available technology and off-the-shelf equipment to significantly decrease development costs. Original estimates to develop a capsule-type crew return vehicle were estimated at more than $2 billion. X-38 project officials have estimated that development costs for the X-38 concept will be approximately one quarter of the original estimate. Off-the-shelf technology is not necessarily 'old' technology. Many of the technologies being used in the X-38 project have never before been applied to a human-flight spacecraft. For example, the X-38 flight computer is commercial equipment currently used in aircraft and the flight software operating system is a commercial system already in use in many aerospace applications. The video equipment for the X-38 is existing equipment, some of which has already flown on the space shuttle for previous NASA experiments. The X-38's primary navigational equipment, the Inertial Navigation System/Global Positioning System, is a unit already in use on Navy fighters. The X-38 electromechanical actuators come from previous joint NASA, U.S. Air Force, and U.S. Navy research and development projects. Finally, an existing special coating developed by NASA will be used on the X-38 thermal tiles to make them more durable than those used on the space shuttles. The X-38 itself was an

  19. Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

    Energy Technology Data Exchange (ETDEWEB)

    Tuenge, Jason R.

    2011-06-28

    The U.S. Department of Energy is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr to a much larger figure nationally. Most of the energy savings in this application is attributable to the instant-restrike capability of LED products and to their high tolerance for frequent on/off switching, used here to separately control either end of the tunnel during daytime hours. Some LED luminaires rival or outperform their high-intensity discharge (HID) counterparts in terms of efficacy, but options are limited, and smaller lumen packages preclude true one-for-one equivalence. However, LED products continue to improve in efficacy and affordability at a rate unmatched by other light source technologies; the estimated simple payback period of eight years (excluding installation costs and maintenance savings) can be expected to improve with time. The proposed revisions to the existing high-pressure sodium (HPS) lighting system would require slightly increased controls complexity and significantly increased luminaire types and quantities. In exchange, substantial annual savings (from reduced maintenance and energy use) would be complemented by improved quantity and quality of illumination. Although advanced lighting controls could offer additional savings, it is unclear whether such a system would prove cost-effective; this topic may be explored in future work.

  20. 78 FR 32637 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2013-05-31

    ... Project, Department of the Army, Army Research, Development and Engineering Command, Edgewood Chemical... probationary period for newly hired engineering and science employees; (3) pay banding; (4) streamlined... Project, Department of the Army, Army Research, Development and Engineering Command, Edgewood...

  1. Baca Geothermal Demonstration project legal and regulatory challenges. First semi-annual report for period through June 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Province, S.G.; Walter, K.M.; Miller, J.

    1980-12-01

    The Legal and Regulatory Constraints Reports identify and describe the major legal and institutional constraints associated with the Baca Geothermal Demonstration Project. The impacts of these constraints on the Project in terms of cost, schedule, and technical design are also analyzed. The purpose of these reports is to provide a guide for future geothermal development.

  2. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  3. The role of scenarios and demonstrators in promoting shared understanding in innovation projects

    NARCIS (Netherlands)

    Steen, M.G.D.; Buijs, J.; Williams, D.

    2014-01-01

    It can be challenging for people in an innovation project to develop a shared understanding of the project's overall vision and of what they need to do practically—especially if the project is organized as networked innovation and follows a designerly approach. Yet shared understanding is critical f

  4. An Academic Club Service Learning Project as a Demonstration of Experiential Teaching Tools

    Science.gov (United States)

    Bonczek, James L.; Snyder, Lori Unruh; Ellis, Larry R.

    2007-01-01

    We describe our pedagogical approaches and experiences with an academic club service learning project (one semester, 20 club participants, including both graduate students and lower and upper-level undergraduates). Our service learning project responds to the recent demand for more community service-based club projects within the College of…

  5. West Valley Demonstration Project vitrification process equipment Functional and Checkout Testing of Systems (FACTS)

    Energy Technology Data Exchange (ETDEWEB)

    Carl, D.E.; Paul, J.; Foran, J.M.; Brooks, R.

    1990-09-30

    The Vitrification Facility (VF) at the West Valley Demonstration Project was designed to convert stored radioactive waste into a stable glass for disposal in a federal repository. The Functional and Checkout Testing of Systems (FACTS) program was conducted from 1984 to 1989. During this time new equipment and processes were developed, installed, and implemented. Thirty-seven FACTS tests were conducted, and approximately 150,000 kg of glass were made by using nonradioactive materials to simulate the radioactive waste. By contrast, the planned radioactive operation is expected to produce approximately 500,000 kg of glass. The FACTS program demonstrated the effectiveness of equipment and procedures in the vitrification system, and the ability of the VF to produce quality glass on schedule. FACTS testing also provided data to validate the WVNS waste glass qualification method and verify that the product glass would meet federal repository acceptance requirements. The system was built and performed to standards which would have enabled it to be used in radioactive service. As a result, much of the VF tested, such as the civil construction, feed mixing and holding vessels, and the off-gas scrubber, will be converted for radioactive operation. The melter was still in good condition after being at temperature for fifty-eight of the sixty months of FACTS. However, the melter exceeded its recommended design life and will be replaced with a similar melter. Components that were not designed for remote operation and maintenance will be replaced with remote-use items. The FACTS testing was accomplished with no significant worker injury or environmental releases. During the last FACTS run, the VF processes approximated the remote-handling system that will be used in radioactive operations. Following this run the VF was disassembled for conversion to a radioactive process. Functional and checkout testing of new components will be performed prior to radioactive operation.

  6. Advanced fuel gas desulfurization (AFGD) demonstration project. Technical progress report No. 19, July 1, 1994--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The {open_quotes}Advanced Flue Gas Desulfurization (AFGD) Demonstration Project{close_quotes} is a $150.5 million cooperative effort between the U.S. Department of Energy and Pure Air, a general partnership of Air Products and Chemicals, Inc. and Mitsubishi Heavy Industries America, Inc. The AFGD process is one of several alternatives to conventional flue gas desulfurization (FGD) being demonstrated under the Department of Energy`s Clean Coal Technology Demonstration Program. The AFGD demonstration project is located at the Northern Indiana Public Service Company`s Bailly Generating Station, about 12 miles northeast of Gary, Indiana.

  7. Benchmarking the Remote-Handled Waste Facility at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    O. P. Mendiratta; D. K. Ploetz

    2000-02-29

    ABSTRACT Facility decontamination activities at the West Valley Demonstration Project (WVDP), the site of a former commercial nuclear spent fuel reprocessing facility near Buffalo, New York, have resulted in the removal of radioactive waste. Due to high dose and/or high contamination levels of this waste, it needs to be handled remotely for processing and repackaging into transport/disposal-ready containers. An initial conceptual design for a Remote-Handled Waste Facility (RHWF), completed in June 1998, was estimated to cost $55 million and take 11 years to process the waste. Benchmarking the RHWF with other facilities around the world, completed in November 1998, identified unique facility design features and innovative waste pro-cessing methods. Incorporation of the benchmarking effort has led to a smaller yet fully functional, $31 million facility. To distinguish it from the June 1998 version, the revised design is called the Rescoped Remote-Handled Waste Facility (RRHWF) in this topical report. The conceptual design for the RRHWF was completed in June 1999. A design-build contract was approved by the Department of Energy in September 1999.

  8. Range 8C Rehabilitation Demonstration Project, Hohenfels Training Area, Germany: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Johnson, D.O. (Argonne National Lab., IL (United States). Energy Systems Div.); Severinghaus, W.D. (Corps of Engineers, Champaign, IL (United States)); Brent, J.J. (Army Construction Engineering Research Lab., Champaign, IL (United States))

    1991-11-01

    More than 30 years of intensive and continual tactical training has caused extensive environmental damage at the US Army Hohenfels Training Area in Germany. The Range 8C Rehabilitation Demonstration Project, followed by a three-year monitoring effort, was conducted to develop and evaluate the environmental and economic effectiveness of seven revegetation and four erosion control prescriptions implemented at a 16-ha site. The point-intercept method was used to measure the types and amounts of vegetation established and the changes in the vegetative community during three years of military use on the seven areas treated with revegetation prescriptions. Field observations were made to determine the suitability and durability of four types of erosion control structures. Soil fertility and a source of seed appeared to be the most limiting factors in establishing vegetation, while seedbed preparation had only a minor influence. Grasses appeared to be more resistant to vehicle traffic than did other types of vegetation. Because grassed waterways were used as roads by military vehicles and a system of graded terraces was expensive, these erosion control prescriptions were unsuitable and uneconomical for use on training areas. Low-cost riprap waterbars and porous check dams slowed the velocity of runoff, trapped sediments, and were durable. Recommendations were formulated to improve the environmental and economic effectiveness of future rehabilitation efforts on tactical training areas.

  9. Simulation Model of Bus Rapid Transit

    Directory of Open Access Journals (Sweden)

    Gunawan Fergyanto E.

    2014-03-01

    Full Text Available Bus rapid transit system is modern solution for mass transportation system. The system, in comparison to the rail-based transportation system, is significantly cheaper and requires shorter development time, but lower performance. The BRT system performance strongly depends on variables related to station design and infrastructure. A numerical model offers an effective and efficient means to evaluate the system performance. This article offers a detailed numerical model on the basis of the discrete-event approach and demonstrates its application.

  10. Aids to School Bus Design

    Science.gov (United States)

    1991-01-01

    Navistar International Transportation Corporation, Chicago, IL, used three separate NASA-developed technologies in the design and testing of their 3000 Series Bus Chassis which was developed expressly for school bus applications. For structural analysis, they used the MSC/NASTRAN program which mathematically analyzes a design and predicts how it will hold up under stress. They also used the SPATE 9000 system for non-contact measurement of stress, load transfer mechanisms, detection of hidden flaws, and monitoring structural changes during fatigue testing. SPATE 9000 was based on infrared stress measurement technology developed by Langley Research Center. They also employed the Wyle Ride Quality Meter, which was developed by Langley to aid in passenger aircraft design by providing an accurate measurement of ride vibration and sound level. These numbers translate into a subjective discomfort level index. These technologies contribute to the company's 45-48 percent share of the school bus chassis market.

  11. School bus and children's traffic safety

    Institute of Scientific and Technical Information of China (English)

    PAN Shu-ming; Stephen Hargarten; ZHU Shan-kuan

    2007-01-01

    There is no safer way to transport a child than a school bus. Fatal crashes involving occupants are extremely rare events in the US. In recent years, school bus transportation began to develop in China. We want to bring advanced experience on school bus safety in Western countries such as the US to developing countries.Methods: We searched the papers related to school bus safety from Medline, Chinese Scientific Journals Database and the Web of the National Highway Traffic Safety Administration (NHTSA).Results: There were only 9 papers related to school bus safety, which showed that higher levels of safety standards on school buses, school bus-related transportation and environmental laws and injury prevention were the primary reasons for the desired outcome. Few school bus is related to deaths and injuries in the developed countries.Conclusions: The developing countries should make strict environmental laws and standards on school bus safety to prevent children's injury and death.

  12. Observations of coastal sediment dynamics of the Tijuana Estuary Fine Sediment Fate and Transport Demonstration Project, Imperial Beach, California

    Science.gov (United States)

    Warrick, Jonathan A.; Rosenberger, Kurt J.; Lam, Angela; Ferreiera, Joanne; Miller, Ian M.; Rippy, Meg; Svejkovsky, Jan; Mustain, Neomi

    2012-01-01

    Coastal restoration and management must address the presence, use, and transportation of fine sediment, yet little information exists on the patterns and/or processes of fine-sediment transport and deposition for these systems. To fill this information gap, a number of State of California, Federal, and private industry partners developed the Tijuana Estuary Fine Sediment Fate and Transport Demonstration Project ("Demonstration Project") with the purpose of monitoring the transport, fate, and impacts of fine sediment from beach-sediment nourishments in 2008 and 2009 near the Tijuana River estuary, Imperial Beach, California. The primary purpose of the Demonstration Project was to collect and provide information about the directions, rates, and processes of fine-sediment transport along and across a California beach and nearshore setting. To achieve these goals, the U.S. Geological Survey monitored water, beach, and seafloor properties during the 2008–2009 Demonstration Project. The project utilized sediment with ~40 percent fine sediment by mass so that the dispersal and transport of fine sediment would be easily recognizable. The purpose of this report is to present and disseminate the data collected during the physical monitoring of the Demonstration Project. These data are available online at the links noted in the "Additional Digital Information" section. Synthesis of these data and results will be provided in subsequent publications.

  13. High Temperature Syngas Cleanup Technology Scale-up and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Gardner, Ben [Research Triangle Inst. (RTI), Research Triangle Park, NC (United States); Turk, Brian [Research Triangle Inst. (RTI), Research Triangle Park, NC (United States); Denton, David [Research Triangle Inst. (RTI), Research Triangle Park, NC (United States); Gupta, Raghubir [Research Triangle Inst. (RTI), Research Triangle Park, NC (United States)

    2015-09-30

    Gasification is a technology for clean energy conversion of diverse feedstocks into a wide variety of useful products such as chemicals, fertilizers, fuels, electric power, and hydrogen. Existing technologies can be employed to clean the syngas from gasification processes to meet the demands of such applications, but they are expensive to build and operate and consume a significant fraction of overall parasitic energy requirements, thus lowering overall process efficiency. RTI International has developed a warm syngas desulfurization process (WDP) utilizing a transport-bed reactor design and a proprietary attrition-resistant, high-capacity solid sorbent with excellent performance replicated at lab, bench, and pilot scales. Results indicated that WDP technology can improve both efficiency and cost of gasification plants. The WDP technology achieved ~99.9% removal of total sulfur (as either H2S or COS) from coal-derived syngas at temperatures as high as 600°C and over a wide range of pressures (20-80 bar, pressure independent performance) and sulfur concentrations. Based on the success of these tests, RTI negotiated a cooperative agreement with the U.S. Department of Energy for precommercial testing of this technology at Tampa Electric Company’s Polk Power Station IGCC facility in Tampa, Florida. The project scope also included a sweet water-gas-shift process for hydrogen enrichment and an activated amine process for 90+% total carbon capture. Because the activated amine process provides some additional non-selective sulfur removal, the integration of these processes was expected to reduce overall sulfur in the syngas to sub-ppmv concentrations, suitable for most syngas applications. The overall objective of this project was to mitigate the technical risks associated with the scale up and integration of the WDP and carbon dioxide capture technologies, enabling subsequent commercial-scale demonstration. The warm syngas cleanup pre-commercial test unit

  14. 76 FR 8529 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Project...

    Science.gov (United States)

    2011-02-14

    ... appraisal system; (8) market based starting salaries; (9) academic degree and certificate training; (10... health and stress between STRL situations and the former demo project situations (which focused...

  15. 75 FR 60091 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2010-09-29

    ... Project, Department of the Army, Army Research, Development and Engineering Command, Armament Research... Engineering Command, Armament Research, Development and Engineering Center (ARDEC). Within that notice...

  16. Clean Coal Technology Demonstration Program: Project fact sheets 2000, status as of June 30, 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The Clean Coal Technology Demonstration Program (CCT Program), a model of government and industry cooperation, responds to the Department of Energy's (DOE) mission to foster a secure and reliable energy system that is environmentally and economically sustainable. The CCT Program represents an investment of over $5.2 billion in advanced coal-based technology, with industry and state governments providing an unprecedented 66 percent of the funding. With 26 of the 38 active projects having completed operations, the CCT Program has yielded clean coal technologies (CCTs) that are capable of meeting existing and emerging environmental regulations and competing in a deregulated electric power marketplace. The CCT Program is providing a portfolio of technologies that will assure that U.S. recoverable coal reserves of 274 billion tons can continue to supply the nation's energy needs economically and in an environmentally sound manner. As the nation embarks on a new millennium, many of the clean coal technologies have realized commercial application. Industry stands ready to respond to the energy and environmental demands of the 21st century, both domestically and internationally, For existing power plants, there are cost-effective environmental control devices to control sulfur dioxide (S02), nitrogen oxides (NO,), and particulate matter (PM). Also ready is a new generation of technologies that can produce electricity and other commodities, such as steam and synthetic gas, and provide efficiencies and environmental performance responsive to global climate change concerns. The CCT Program took a pollution prevention approach as well, demonstrating technologies that remove pollutants or their precursors from coal-based fuels before combustion. Finally, new technologies were introduced into the major coal-based industries, such as steel production, to enhance environmental performance. Thanks in part to the CCT Program, coal--abundant, secure, and economical

  17. Ten Tips for Talking to Townies: Observations on Risk Communication from the Multihazards Demonstration Project

    Science.gov (United States)

    Porter, K. A.; Jones, L. M.

    2010-12-01

    The USGS’s Multihazards Demonstration Project (MHDP) seeks to demonstrate how hazard science can improve a community’s resiliency to natural hazards. To do so, it must accurately but clearly communicate scientific concepts and findings to a wide variety of nonscientist stakeholders, many of whom are technical experts in their field primarily interested in the implications of MHDP’s science for them, and relatively uninterested in the science per se. During the development and rollout of the MHDP scenarios we found several strategies of risk communication helpful. Use availability. Relate new ideas to events the audience personally observed. Avoid sensationalism, since even the appearance of an appeal to emotion seemed to undermine the credibility of the message among certain constituencies. Avoid probability. However tempted we are as scientists to emphasize the unknown, stakeholders preferred a single coherent story. We can accompany the coherent story with an acknowledgment of uncertainty and limited knowledge. Engage stakeholders in the science as early as possible. They can help ground, direct, and vet the science as it emerges, and help us avoid “spherical-cow” simplifications. Get to the point. Soundbites, despite negative connotations, promote conciseness. Emphasize consensus. While scientists are primarily interested in the boundaries of knowledge, the public is more interested in what is known, and acts more readily where there is no ambiguity. Confront misinformation. Science sometimes competes with pseudoscience for public mindspace. Where the goal is enhancing community resiliency, the competition becomes a battle. Temper talk with activities. We learn by doing, and some of us have no patience for lectures. Use engaging imagery. We found that modern media such as Youtube videos with high production quality and geospatial imagery that the public sees as cutting edge, captured people’s attention, even senior professionals and academics who

  18. Development of analytical cell support for vitrification at the West Valley Demonstration Project. Topical report

    Energy Technology Data Exchange (ETDEWEB)

    Barber, F.H.; Borek, T.T.; Christopher, J.Z. [and others

    1997-12-01

    Analytical and Process Chemistry (A&PC) support is essential to the high-level waste vitrification campaign at the West Valley Demonstration Project (WVDP). A&PC characterizes the waste, providing information necessary to formulate the recipe for the target radioactive glass product. High-level waste (HLW) samples are prepared and analyzed in the analytical cells (ACs) and Sample Storage Cell (SSC) on the third floor of the main plant. The high levels of radioactivity in the samples require handling them in the shielded cells with remote manipulators. The analytical hot cells and third floor laboratories were refurbished to ensure optimal uninterrupted operation during the vitrification campaign. New and modified instrumentation, tools, sample preparation and analysis techniques, and equipment and training were required for A&PC to support vitrification. Analytical Cell Mockup Units (ACMUs) were designed to facilitate method development, scientist and technician training, and planning for analytical process flow. The ACMUs were fabricated and installed to simulate the analytical cell environment and dimensions. New techniques, equipment, and tools could be evaluated m in the ACMUs without the consequences of generating or handling radioactive waste. Tools were fabricated, handling and disposal of wastes was addressed, and spatial arrangements for equipment were refined. As a result of the work at the ACMUs the remote preparation and analysis methods and the equipment and tools were ready for installation into the ACs and SSC m in July 1995. Before use m in the hot cells, all remote methods had been validated and four to eight technicians were trained on each. Fine tuning of the procedures has been ongoing at the ACs based on input from A&PC technicians. Working at the ACs presents greater challenges than had development at the ACMUs. The ACMU work and further refinements m in the ACs have resulted m in a reduction m in analysis turnaround time (TAT).

  19. Micellar-polymer joint demonstration project, Wilmington Field, California. Annual report, 1976--1977

    Energy Technology Data Exchange (ETDEWEB)

    Wade, J.E.

    1977-12-01

    Work accomplished under the contract during the first year of operation consisted of Micellar-Polymer laboratory systems design; Test Pattern Model Studies; Drilling and coring injection well FT-1; Pressure Transient Tests of Wells Z-81, Z1-16and FT-1; as well as design and construction of a portion of the surface facilities. Radial core floods conducted by Marathon Research Center using reservoir rock and fluid samples from the Wilmington Field demonstrated that Micellar-Polymer systems showing good recovery efficiency could be made from several different commercially available sulfonates. Residual oil saturations obtained were as low as 7 to 10% pore volume. Sulfonates made from Wilmington crude oil also proved to be effective. Polyacrylamides, both liquid and dry, as well as polysaccharides proved equally effective as a mobility buffer. Test pattern model studies were conducted on seven different arrays of wells. These studies showed that the pattern originally proposed exhibited poor areal sweep efficiency and was seriously affected by waterflood operations in the North Flank of the fault block. An E-W staggered line drive backed-up against the Pier A Fault appeared to be the best pattern studied, assuming the Pier A Fault to be a pressure barrier. Injection well FT-1 was drilled, cored and completed in the Hx/sub a/ sand. Cores were taken using low-solids, polymer drilling fluid and were frozen on site. The frozen cores from the project area will be used in the Phase B laboratory work. Pressure Transient Tests run in Z-81 and Z1-16 indicated the Pier A Fault to be pressure competent. The plant site was located adjacent to a railroad siding near the injection wells. The site was graded and seven 2000 barrel tanks were erected. The tanks were internally plastic coated on site. Mixing, filtering and injection facilities are being installed.

  20. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  1. Partnership disengagement from primary community care networks (PCCNs: A qualitative study for a national demonstration project

    Directory of Open Access Journals (Sweden)

    Lin Cheng-Chieh

    2010-04-01

    Full Text Available Abstract Background The Primary Community Care Network (PCCN Demonstration Project, launched by the Bureau of National Health Insurance (BNHI in 2003, is still in progress. Partnership structures in PCCNs represent both contractual clinic-to-clinic and clinic-to-hospital member relationships of organizational aspects. The partnership structures are the formal relationships between individuals and the total network. Their organizational design aims to ensure effective communication, coordination, and integration across the total network. Previous studies have focused largely on how contractual integration among the partnerships works and on its effects. Few studies, however, have tried to understand partnership disengagement in PCCNs. This study explores why some partnerships in PCCNs disengage. Methods This study used a qualitative methodology with semi-structured questions for in-depth interviews. The semi-structured questions were pre-designed to explore the factors driving partnership disengagement. Thirty-seven clinic members who had withdrawn from their PCCNs were identified from the 2003-2005 Taiwan Primary Community Care Network Lists. Results Organization/participant factors (extra working time spend and facility competency, network factors (partner collaboration, and community factors (health policy design incompatibility, patient-physician relationship, and effectiveness are reasons for clinic physicians to withdraw or change their partnerships within the PCCNs. Conclusions To strengthen partnership relationships, several suggestions are made, including to establish clinic and hospital member relationships, and to reduce administrative work. In addition, both educating the public about the concept of family doctors and ensuring well-organized national health policies could help health care providers improve the integration processes.

  2. Impact of urban heat island on cooling and environment: A demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    Landscaping has been shown in simulation and field studies to reduce building cooling loads by affecting microclimatic factors such as solar radiation, wind speed and air temperature. A demonstration project was undertaken to determine the magnitude of landscape induced changes in microclimate on building cooling loads and water use on four typical residences in Phoenix, Arizona. The energy use and microclimate of three unlandscaped (bare soil, rock mulch) and one landscaped (turf) home were monitored during summer 1990. In the fall, turf was placed around one of the unlandscaped houses, and shade trees planted on the west and south sides of another. Measurements continued during the summer of 1991. Total house air conditioning and selected appliance electrical data were collected, as well as inside and outside air temperatures. Detailed microclimate measurements were obtained for one to two week periods during both summers. Maximum reductions of hourly outside air temperatures of 1 to 1.5{degrees}C, and of daily average air temperatures of up to 1{degrees}C, resulted from the addition of turf landscaping. Addition of small trees to the south and west sides of another treatment did not have a noticeable effect on air temperature. Cooling load reductions of 10% to 17% were observed between years when well-watered turf landscaping was added to a house previously surrounded by bare soil. Addition of small trees to another bare landscape did not produce a detectable change in cooling load. The results of the study are used as input to a standard building energy use simulation model to predict landscape effects on cooling load and water usage for three typical houses, and to develop guidelines for use of energy efficient residential landscapes in Phoenix, Arizona.

  3. Research, demonstration, and extension: the ARS area-wide ecologically based invasive plant management project

    Science.gov (United States)

    The Area-wide project is a collaborative five year effort funded in 2008 by USDA-ARS that has brought together scientists with the USDA-ARS, universities, land managers, and policy makers throughout the Great Basin. A primary goal of the project is to develop and implement a comprehensive, regional...

  4. Goose River, Maine, demonstration project, January 1978-October 1978. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1978-11-24

    The proposed Goose River Project is a commercial power development consisting of 4 power dams and one storage dam. All available energy is to be wholesaled to the Central Maine Power Company, the utility holding the franchise for the area. A description of the economic feasibility of the proposed project is presented.

  5. Test plan for in situ bioremediation demonstration of the Savannah River Integrated Demonstration Project DOE/OTD TTP No.: SR 0566-01. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Hazen, T.C.

    1991-09-18

    This project is designed to demonstrate in situ bioremediation of groundwater and sediment contaminated with chlorinated solvents. Indigenous microorganisms will be simulated to degrade trichloroethylene (TCE), tetrachloroethylene (PCE) and their daughter products in situ by addition of nutrients to the contaminated zone. in situ biodegradation is a highly attractive technology for remediation because contaminants are destroyed, not simply moved to another location or immobilized, thus decreasing costs, risks, and time, while increasing efficiency and public and regulatory acceptability. Bioremediation has been found to be among the least costly technologies in applications where it will work.

  6. The River EdenDTC Project: A National Demonstration Test Catchment

    Science.gov (United States)

    Benskin, C.; Surridge, B.; Deasy, C.; Woods, C.; Rimmer, D.; Lees, E.; Owens, G.; Jonczyk, J.; Quinton, J.; Wilkinson, M.; Perks, M.; Quinn, P.; Barker, P.; Haygarth, P.; Burke, S.; Reaney, S.; Watson, N.

    2012-04-01

    Our environment is a complex system of interactions between natural process and anthropogenic activities that disrupt them. It is crucial to manage the balance for continued food production whilst maintaining the quality of the environment. The challenges we face include managing the impact of agricultural land use on aquatic quality and biodiversity as an integral system, rather than as separate issues. In order to do this, it is critical to understand how the different components are linked - how does land use affect our water courses and ground water, and their associated ecosystems, and how can the impact of agricultural land use on these systems be minimised? Regulating farm nutrient management through measures that minimise sources, their exposure to mobilisation, and reduce drainage pathways to water courses are all fundamental to the UK's approach to meeting the Water Framework Directive objective of achieving 'good ecological status' in all surface and groundwater bodies by 2015. The EdenDTC project is part of a 5-year national Demonstration Test Catchments (DTC) environmental scheme, aiming to understand the above issues through combining scientific research with local knowledge and experience from multiple stakeholders. The DTC project is a 5-year initiative by Defra, Welsh Assembly Government and the Environment Agency, which encompasses a research platform covering three distinct river catchments: the Eden in Cumbria; the Wensum in Norfolk; and the Avon in Hampshire. Within the EdenDTC, the impact and effects of multiple diffuse pollutants on ecosystems and sustainable food production are being studied on a river catchment scale. Three 10 km2 focus catchments, selected to represent the different farming practices and geologies observed across the Eden, have been instrumented to record the dynamics of agricultural diffuse pollution at multiple scales. Within each focus catchment, two sub-catchments were selected: one control and one mitigation, in which

  7. Low-inductance bus lines

    Science.gov (United States)

    Kernick, A.

    1977-01-01

    Laminated bus strips and bifilar litz cable connectors for high-power rectifiers, thrisistors, and transistors provide low inductance and eliminate electromagnetic interference in high-power circuits. These techniques offer significant cost advantages because of ease of assembly and consistent high quality of product. Effectiveness makes general usage in static power conversion likely.

  8. HERMES travels by CAN bus

    Science.gov (United States)

    Waller, Lewis G.; Shortridge, Keith; Farrell, Tony J.; Vuong, Minh; Muller, Rolf; Sheinis, Andrew I.

    2014-07-01

    The new HERMES spectrograph represents the first foray by AAO into the use of commercial off-the-shelf industrial field bus technology for instrument control, and we regard the final system, with its relatively simple wiring requirements, as a great success. However, both software and hardware teams had to work together to solve a number of problems integrating the chosen CANopen/CAN bus system into our normal observing systems. A Linux system running in an industrial PC chassis ran the HERMES control software, using a PCI CAN bus interface connected to a number of distributed CANopen/CAN bus I/O devices and servo amplifiers. In the main, the servo amplifiers performed impressively, although some experimentation with homing algorithms was required, and we hit a significant hurdle when we discovered that we needed to disable some of the encoders used during observations; we learned a lot about how servo amplifiers respond when their encoders are turned off, and about how encoders react to losing power. The software was based around a commercial CANopen library from Copley Controls. Early worries about how this heavily multithreaded library would work with our standard data acquisition system led to the development of a very low-level CANopen software simulator to verify the design. This also enabled the software group to develop and test almost all the control software well in advance of the construction of the hardware. In the end, the instrument went from initial installation at the telescope to successful commissioning remarkably smoothly.

  9. Spaceflight qualification of the SEDS MIL-STD-1773 fiber optic data bus

    Science.gov (United States)

    Flanegan, Mark C.

    1993-09-01

    The small explorer (SMEX) project at Goddard Space Flight Center (GSFC) launched the first spaceflight implementation of the MIL-STD-1773 fiber optic data bus on the Solar Anomalous Magnetospheric Particle Explorer (SAMPEX) in July of 1992. The Small Explorer Data System (SEDS), of which the MIL-STD-1773 data bus is a part, has been successful. The MIL-STD-1773 bus is the implementation of the MIL-STD-1553 protocol using fiber optics. Advantages of the fiber optic bus over the electrical bus include lower power, lower weight, and immunity from EMI/RFI. It does not radiate electrical or magnetic fields. It is a nonconductor so it cannot conduct electrical noise into or from a subsystem. This is particularly advantageous on a spacecraft with very sensitive instruments which are often susceptible to electrical interference. Although the MIL-STD-1773 bus is a 1 Mbps bus like the MIL-STD-1553 bus, the fiber optics also provide a path to the much higher rate systems required in upcoming NASA missions.

  10. The Fort McMurray Demonstration Project in Social Marketing: no demonstrable effect on already falling injury rates following intensive community and workplace intervention.

    Science.gov (United States)

    Guidotti, Tee L; Deb, Pooja; Bertera, Robert; Ford, Lynda

    2009-10-01

    The Fort McMurray Demonstration Project in Social Marketing attempted to achieve mutually reinforcing effects from thematically coordinated educational and awareness efforts in the community as a whole and in the workplace and the inclusion of occupational safety within the framework of a community health promotion project. The study community was Fort McMurray, a small, industrial city in northern Alberta. The Mistahiai Health Region, several hundred kilometers to the west and also dominated by one city, Grande Prairie, served as the reference community. The intervention was based on media and events staged at public events, with supporting educational activities in schools and the community. It relied heavily on community-based partners and volunteers. Data on healthcare utilization of selected preventable injuries were obtained from Alberta Health for the time period 1990-1996 for the Regional Health Authorities of Northern Lights, where the only large population centre is Fort McMurray, and Mistahia. Age-adjusted aggregate injury rates were analyzed for evidence of an effect of the intervention. Severity was measured by proxy, using the number of diagnostic claims submitted for reimbursement for medical services in a given year. The communities differed in age-specific injury rates, with Fort McMurray showing higher rates for residents aged less than 55. Young adults and older adolescents showed higher levels of severity. Injury rates fell substantially and at similar rates in both communities over the five-year period. However, in both communities injury rates were already falling before the intervention in Fort McMurray began and continued to fall at about the same rate, slowing toward the end of the period. No evidence was found for an effect of the Project or for acceleration of the reduction in injury frequency in the intervention area. Over the period, fewer medical services were delivered in office settings and more in emergency rooms, in both

  11. Project Overview of CA6730SFD31 Special School Bus for Pupils%CA6730SFD31小学生专用校车方案概述

    Institute of Scientific and Technical Information of China (English)

    孙红; 刘力楠; 黄俊杰

    2014-01-01

    介绍CA6730SFD31小学生专用校车技术方案,包括造型、车身总布置、应急出口方案、座椅布置、内饰方案、主要性能参数等;经过试验,样车满足校车安全标准相关要求,已实现批量投产。%The authors introduce the technical program of CA6730SFD31 special school bus for pupils, including body modeling, general layout of the body, the emergency exit plan, seat arrangement, the interior scheme, main per-formance parameters etc. The bus prototype vehicle has been tested and meets the relevant requirements of the school bus safety standards. It has achieved mass production.

  12. 76 FR 50474 - Special Demonstration Programs-National Technical Assistance Projects To Improve Employment...

    Science.gov (United States)

    2011-08-15

    ... Materials (NCRTM), the regional Technical Assistance and Continuing Education (TACE) centers, and State VR.... Final Priority: National Technical Assistance. The Assistant Secretary for Special Education and... fund a project to provide national technical assistance (TA) to State vocational rehabilitation...

  13. 75 FR 30197 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2010-05-28

    ...) Improved employee satisfaction with pay setting and adjustment, recognition, and career advancement... improvements in the civilian personnel policy, organization, and management. Pursuant to the authority provided... Required D. Expected Benefits E. Participating Organizations and Employees F. Project Design...

  14. Occupational Safety and Health Program at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    L. M. Calderon

    1999-04-30

    The West Valley Nuclear Services Co. LLC (WVNS) is committed to provide a safe, clean, working environment for employees, and to implement U.S. Department of Energy (DOE) requirements affecting worker safety. The West Valley Demonstration Project (WVDP) Occupational Safety and Health Program is designed to protect the safety, health, and well-being of WVDP employees by identifying, evaluating, and controlling biological, chemical, and physical hazards in the work place. Hazards are controlled within the requirements set forth in the reference section at the end of this report. It is the intent of the WVDP Occupational Safety and Health Program to assure that each employee is provided with a safe and healthy work environment. This report shows the logical path toward ensuring employee safety in planning work at the WVDP. In general, planning work to be performed safely includes: combining requirements from specific programs such as occupational safety, industrial hygiene, radiological control, nuclear safety, fire safety, environmental protection, etc.; including WVDP employees in the safety decision-making processes; pre-planning using safety support re-sources; and integrating the safety processes into the work instructions. Safety management principles help to define the path forward for the WVDP Occupational Safety and Health Program. Roles, responsibilities, and authority of personnel stem from these ideals. WVNS and its subcontractors are guided by the following fundamental safety management principles: ''Protection of the environment, workers, and the public is the highest priority. The safety and well-being of our employees, the public, and the environment must never be compromised in the aggressive pursuit of results and accomplishment of work product. A graded approach to environment, safety, and health in design, construction, operation, maintenance, and deactivation is incorporated to ensure the protection of the workers, the public, and the

  15. Three-dimensional numerical reservoir simulation of the EGS Demonstration Project at The Geysers geothermal field

    Science.gov (United States)

    Borgia, Andrea; Rutqvist, Jonny; Oldenburg, Curt M.; Hutchings, Lawrence; Garcia, Julio; Walters, Mark; Hartline, Craig; Jeanne, Pierre; Dobson, Patrick; Boyle, Katie

    2013-04-01

    The Enhanced Geothermal System (EGS) Demonstration Project, currently underway at the Northwest Geysers, California, aims to demonstrate the feasibility of stimulating a deep high-temperature reservoir (up to 400 °C) through water injection over a 2-year period. On October 6, 2011, injection of 25 l/s started from the Prati 32 well at a depth interval of 1850-2699 m below sea level. After a period of almost 2 months, the injection rate was raised to 63 l/s. The flow rate was then decreased to 44 l/s after an additional 3.5 months and maintained at 25 l/s up to August 20, 2012. Significant well-head pressure changes were recorded at Prati State 31 well, which is separated from Prati 32 by about 500 m at reservoir level. More subdued pressure increases occur at greater distances. The water injection caused induced seismicity in the reservoir in the vicinity of the well. Microseismic monitoring and interpretation shows that the cloud of seismic events is mainly located in the granitic intrusion below the injection zone, forming a cluster elongated SSE-NNW (azimuth 170°) that dips steeply to the west. In general, the magnitude of the events increases with depth and the hypocenter depth increases with time. This seismic cloud is hypothesized to correlate with enhanced permeability in the high-temperature reservoir and its variation with time. Based on the existing borehole data, we use the GMS™ GUI to construct a realistic three-dimensional (3D) geologic model of the Northwest Geysers geothermal field. This model includes, from the top down, a low permeability graywacke layer that forms the caprock for the reservoir, an isothermal steam zone (known as the normal temperature reservoir) within metagraywacke, a hornfels zone (where the high-temperature reservoir is located), and a felsite layer that is assumed to extend downward to the magmatic heat source. We then map this model onto a rectangular grid for use with the TOUGH2 multiphase, multicomponent, non

  16. The anatomy of a World Wide Web library service: the BONES demonstration project. Biomedically Oriented Navigator of Electronic Services.

    OpenAIRE

    Schnell, E H

    1995-01-01

    In 1994, the John A. Prior Health Sciences Library at Ohio State University began to develop a World Wide Web demonstration project, the Biomedically Oriented Navigator of Electronic Services (BONES). The initial intent of BONES was to facilitate the health professional's access to Internet resources by organizing them in a systematic manner. The project not only met this goal but also helped identify the resources needed to launch a full-scale Web library service. This paper discusses the ta...

  17. Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase - Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hitchcock, David

    2012-06-29

    , and regenerative braking for battery charging. It uses a 19.3 kW Ballard PEM fuel cell, will store 12.6 kg of hydrogen at 350 Bar, and includes a 60 kWh battery storage system. The objectives of the project included the following: (a) To advance commercialization of hydrogen-powered transit buses and supporting infrastructure; (b) To provide public outreach and education by showcasing the operation of a 22-foot fuel cell hybrid shuttle bus and Texas first hydrogen fueling infrastructure; and (c) To showcase operation of zero-emissions vehicle for potential transit applications. As mentioned above, the project successfully demonstrated an early vehicle technology, the Ebus plug-in hybrid fuel cell bus, and that success has led to the acquisition of a more advanced vehicle that can take advantage of the same fueling infrastructure. Needed hydrogen station improvements have been identified that will enhance the capabilities of the fueling infrastructure to serve the new bus and to meet the transit agency needs. Over the course of this project, public officials, local government staff, and transit operators were engaged in outreach and education activities that acquainted them with the real world operation of a fuel cell bus and fueling infrastructure. Transit staff members in the Dallas/Ft. Worth region were invited to a workshop in Arlington, Texas at the North Central Texas Council of Governments to participate in a workshop on hydrogen and fuel cells, and to see the fuel cell bus in operation. The bus was trucked to the meeting for this purpose so that participants could see and ride the bus. Austin area transit staff members visited the fueling site in Austin to be briefed on the bus and to participate in a fueling demonstration. This led to further meetings to determine how a fuel cell bus and fueling station could be deployed at Capital Metro Transit. Target urban regions that expressed additional interest during the project in response to the outreach meetings and

  18. Electrical system architecture having high voltage bus

    Science.gov (United States)

    Hoff, Brian Douglas; Akasam, Sivaprasad

    2011-03-22

    An electrical system architecture is disclosed. The architecture has a power source configured to generate a first power, and a first bus configured to receive the first power from the power source. The architecture also has a converter configured to receive the first power from the first bus and convert the first power to a second power, wherein a voltage of the second power is greater than a voltage of the first power, and a second bus configured to receive the second power from the converter. The architecture further has a power storage device configured to receive the second power from the second bus and deliver the second power to the second bus, a propulsion motor configured to receive the second power from the second bus, and an accessory motor configured to receive the second power from the second bus.

  19. GeoBus: sharing science research with schools

    Science.gov (United States)

    Roper, Kathryn; Robinson, Ruth; Moorhouse, Ben

    2016-04-01

    GeoBus (www.geobus.org.uk) is an educational outreach project that was developed in 2012 by the Department of Earth and Environmental Sciences at the University of St Andrews, and it is currently sponsored by industry, NERC, The Crown Estate, and the Scottish Government. The aims of GeoBus are to support the teaching of Earth Science in secondary (middle and high) schools by providing teaching support to schools that have little or no experience in teaching this subject. This is, in part, done through the sharing of new science research outcomes and the experiences of young researchers with school pupils to provide a bridge between industry, higher education institutions, research councils and schools. Since its launch, over 40,000 pupils will have been involved in experiential Earth science learning activities in 190 different schools (over 400 separate visits) across the length and breadth of Scotland: many of these schools are in remote and disadvantaged regions. A new GeoBus project is under development within the Department of Earth Sciences at UCL in London. A key aim of GeoBus is to incorporate new research into our workshops with the main challenge being the development of appropriate resources that incorporate the key learning aims and requirements of the science and geography curricula. GeoBus works closely with researchers, teachers and educational practitioners to tailor the research outcomes to the curricula as much as possible. Over the past four years, GeoBus has developed 17 workshops, 5 challenge events and extensive field trips and each of these activities are trialled and evaluated within the university, and adjustments are made before the activities are delivered in schools. Activities are continually reviewed and further developments are made in response to both teacher and pupil feedback. This critical reflection of the project's success and impact is important to insure a positive and significant contribution to the science learning in

  20. El Dorado Micellar-Polymer demonstration project. First annual report, January 1974-June 1975

    Energy Technology Data Exchange (ETDEWEB)

    Coffman, C.L.; Rosenwald, G.W. (ed.); Miller, R.J. (ed.)

    1975-10-01

    Progress made in the implementation of a project designed to determine the economic feasibility of improved oil recovery using micellar-polymer processes and to determine the associated benefits and problems of each system tested is reported. The project allows a side-by-side comparison of two distinct micellar-polymer processes in the same abandoned field so that the reservoir conditions for the two floods are as nearly alike as possible. Results are reported for test wells drilled to obtain reservoir data, field injectivity and interference tests, and performance predictions. Engineering operations are summarized. (JSR)

  1. Environmental assessment for the electric and hybrid vehicle demonstration project, performance standards and financial incentives

    Energy Technology Data Exchange (ETDEWEB)

    LaBelle, S. J.

    1978-10-01

    The assessment is concerned with the impacts of the demonstration of electric and hybrid vehicles acquired to fulfill certain requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act, PL 94-413 as amended. The financial incentives programs and vehicle performance standards associated with the demonstration are also covered. Not included is an assessment of the long term effects of EHV commercialization and of the research and development program being carried out simultaneously with the demonstration, also in response to PL 94-413. These federal actions will be included in a programmatic environmental assessment scheduled for completion in FY 79.

  2. A Model Vocational High Technology in Health Care Demonstration Project. Final Performance Report.

    Science.gov (United States)

    Valencia Community Coll., Orlando, FL.

    A unique training program in high tech obstetrical, neonatal, and pediatric nursing care areas was designed to be offered on site at Orlando (Florida) Regional Medical/Arnold Palmer Hospital for Children and Women. The training program offered 16 different courses to 355 employees over the 18-month period of the project. A needs assessment was…

  3. PHYSICAL SOLUTIONS FOR ACID ROCK DRAINAGE AT REMOTE SITES DEMONSTRATION PROJECT

    Science.gov (United States)

    This report summarizes the results of Mine Waste Technology Program, Activity III, Project 42, Physical Solutions for Acid Rock Drainage at Remote Sites, funded by the U.S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U.S. Department of Energy. A...

  4. Experiences from Swedish demonstration projects with phosphoric acid fuel cells; Erfarenheter fraan svenska demonstrationsprojekt med fosforsyrabraensleceller

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Per [Sycon Energikonsult AB, Stockholm (Sweden); Sarkoezi, Laszlo [Vattenfall Utveckling AB, Stockholm (Sweden)

    1999-10-01

    In Sweden, there are today two phosphoric acid fuel cells installed, one PC25A which have been in operation in more than 4 years, and one PC25C which have been in operation for two years. The aim with this project has been two compare operation characteristics, performance, and operation experiences for these two models.

  5. OCTAVIUS: a new FP7 project demonstrating CO2 capture technologies

    NARCIS (Netherlands)

    Broutin, P.; Kvamsdal, H.M.; Marca, C. la; Os, P.J. van; Booth, N.

    2013-01-01

    The OCTAVIUS project (Optimisation of CO2 Capture Technology Allowing Verification and Implementation at Utility Scale) has started on March 1st 2012 for a period of 5 years, as part of the 7th Framework Programme of the European Commission. Gathering 15 European and 2 South African partners, OCTAVI

  6. Using Microsimulation to Help Design Pilot Demonstrations: An Illustration from the Canadian Self-Sufficiency Project.

    Science.gov (United States)

    Greenberg, David H.; And Others

    1995-01-01

    This article describes how microsimulation analysis was used to help design a social experiment in two Canadian provinces. The microsimulation was used to choose among alternative program models, to refine the selected model, and to project costs for the Canadian government's program of financial incentives for leaving welfare. (SLD)

  7. 34 CFR 426.4 - What activities does the Secretary fund under the Demonstration Projects?

    Science.gov (United States)

    2010-07-01

    ... disadvantaged individuals (including foster children); (3) Individuals of limited English proficiency; (4... skills needed to make the transition from school to productive employment, including— (i) Work experience... learning programs. (3) The projects described in paragraphs (b) (1) and (2) of this section may...

  8. Djungle power. A more remote AC bus

    Energy Technology Data Exchange (ETDEWEB)

    Boehnke, Heinz W. [Technosol, Jork (Germany)

    2010-07-01

    The Dzanga-Sangha Reserve in the Central African Republic is probably one of the world's most remote protected rainforest areas, much to the benefit of the rare species of lowland gorilla, forest elephant and local pygmy population Ba'Aka. The park is co-managed by the ''WWF-World Wide Fund for Nature'' with sponsoring from the German Regenwald-Stiftung. In 2008 wwf decided to switch from the old, failing generator supply to a solar hybrid mini-grid, along with stringent measures of energy conservation and management. After a careful energy audit Technosol designed an AC-bus system with a 22 kWp PV generator which should overcome the dependency on the old generators and their fuel demands. For 15 buildings, an entirely new distribution network was installed, state of the art energy saving devices introduced and an energy metering system deviced. The installation is operating since August 2009. In such remote locations, the reliability of the AC-bus over other generator-based solutions will be demonstrated and with the support of international organisations like the wwf the practical application of solar hybrid supply becomes a landmark of sustainable energy concepts. (orig.)

  9. Self-scrubbing coal{sup TM}: An integrated approach to clean air. A proposed Clean Coal Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    This environmental assessment (EA) was prepared by the U.S.Department of Energy (DOE), with compliance with the National Environmental Policy Act (NEPA) of 1969, Council on Environmental Quality (CE) regulations for implementating NEPA (40 CFR 1500-1508) and DOE regulations for compliance with NEPA (10 CFR 1021), to evaluate the potential environmental impacts associated with a proposed demonstration project to be cost-shared by DOE and Custom Coals International (CCI) under the Clean Coal Technology (CCT) Demonstration Program of DOE`s Office of Fossil Energy. CCI is a Pennsylvania general partnership located in Pittsburgh, PA engaged in the commercialization of advanced coal cleaning technologies. The proposed federal action is for DOE to provide, through a cooperative agreement with CCI, cost-shared funding support for the land acquisition, design, construction and demonstration of an advanced coal cleaning technology project, {open_quotes}Self-Scrubbing Coal: An Integrated Approach to Clean Air.{close_quotes} The proposed demonstration project would take place on the site of the presently inactive Laurel Coal Preparation Plant in Shade Township, Somerset County, PA. A newly constructed, advanced design, coal preparation plant would replace the existing facility. The cleaned coal produced from this new facility would be fired in full-scale test burns at coal-fired electric utilities in Indiana, Ohio and PA as part of this project.

  10. 75 FR 27808 - Section 8 Housing Choice Voucher Program-Demonstration Project of Small Area Fair Market Rents in...

    Science.gov (United States)

    2010-05-18

    ... are to determine payment standard amounts for the Housing Choice Voucher (HCV) program, to determine... the flexibilities available in the voucher program, to set voucher payment standards at varying and... URBAN DEVELOPMENT Section 8 Housing Choice Voucher Program--Demonstration Project of Small Area...

  11. Economic assessment of geothermal direct heat technology: A review of five DOE demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Hederman, William F. Jr.; Cohen, Laura A.

    1981-06-01

    In this report the cost of using low temperature geothermal energy resources for direct heating applications is compared to the costs associated with conventional heating fuels. The projects compared all involved replacing conventional fuels (e.g., natural gas and fuel oils) with geothermal energy in existing heating systems. The cost of using geothermal energy in existing systems was also compared with the cost of new coal-fired equipment.

  12. The Social Security Administration's Youth Transition Demonstration Projects: Interim Report on Colorado Youth WINS

    OpenAIRE

    2011-01-01

    This report presents first-year evaluation findings for the Colorado Youth WINS (Work Incentive Network of Supports) project, which served youth in four counties from August 2006 to December 2009. Using process analysis, the report found Youth WINS, as implemented, deviated from the program model in ways that may have reduced its potential to achieve certain critical objectives. However, Youth WINS participants were more likely to have used services to promote employment than the control group.

  13. Miniature JPL Universal Instrument Bus Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This work will transition commercial advanced- yet mature- packaging approaches, such as surface mount and system-in-package, into mainstream use at JPL. Starting...

  14. New TPG bus route 28

    CERN Multimedia

    2003-01-01

    Geneva's Public Transport services (TPG) have recently inaugurated a new bus line 28, connecting the La Tour Hospital in Meyrin to the international organisations in Geneva, via the airport. All signs associated with this route will be yellow in colour. Timetables and route details can be found at http://www.tpg.ch. Relations with the Host States Service http://www.cern.ch/relations/ Tel. 72848

  15. Avionic Data Bus Integration Technology

    Science.gov (United States)

    1991-12-01

    address the hardware-software interaction between a digital data bus and an avionic system. Very Large Scale Integration (VLSI) ICs and multiversion ...the SCP. In 1984, the Sperry Corporation developed a fault tolerant system which employed multiversion programming, voting, and monitoring for error... MULTIVERSION PROGRAMMING. N-version programming. 226 N-VERSION PROGRAMMING. The independent coding of a number, N, of redundant computer programs that

  16. Hall Effect Thruster for High Power Solar Electric Propulsion Technology Demonstration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Busek proposes to develop a flight version of a high power Hall Effect thruster. While numerous high power Hall Effect thrusters have been demonstrated in the...

  17. Multi-Element Lean Direct Injection Combustor Single Element Demonstration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to demonstrate the feasibility in a single element of a Multi-Element Lean Direct Injection, ME-LDI, Combustion concept. The concept will have the...

  18. Advanced Modulation Formats in Cognitive Optical Networks: EU project CHRON Demonstration

    DEFF Research Database (Denmark)

    Borkowski, Robert; Caballero Jambrina, Antonio; Klonidis, Dimitris

    2014-01-01

    We demonstrate real-time path establishment and switching of coherent modulation formats (QPSK, 16QAM) within an optical network driven by cognitive algorithms. Cognition aims at autonomous configuration optimization to satisfy quality of transmission requirements.......We demonstrate real-time path establishment and switching of coherent modulation formats (QPSK, 16QAM) within an optical network driven by cognitive algorithms. Cognition aims at autonomous configuration optimization to satisfy quality of transmission requirements....

  19. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  20. Research and demonstration project about networked contractors in chip production; Tutkimus- ja demonstraatiohanke yrittaejaeverkostosta hakkeen tuottamisessa - PUUY15

    Energy Technology Data Exchange (ETDEWEB)

    Jaekaelae, M. [Koneyrittaejien liitto ry, Helsinki, (Finland)

    2002-07-01

    The aim of the project is to study and develop a business dealing method based on network economy between the contractors. The network can comprise of chipping- and/or forest machine- and/or transport contractors. The project consists of research and demonstration parts. Research contains two research areas. The first examines possible forms of co-operation between the contractors and concentrates on description of the business connection arrangements, sharing of commercial risk and resources and distribution of income. The second research area contains description of network logistics: crude material and information streams. The method that has been created will be tested in practise during the demonstration part. Demonstration also contains preparation of quality systems for separate contractors (chipping and forestry) and for the whole network. If the network method is functional it can be multiplied to common use. (orig.)

  1. Research and demonstration project about networked contractors in chip production; Tutkimus- ja demonstraatiohanke yrittaejaeverkostosta hakkeen tuottamisessa - PUUY15

    Energy Technology Data Exchange (ETDEWEB)

    Jaekaelae, M. [Koneyrittaejien liitto ry, Helsinki (Finland)

    2001-07-01

    The aim of the project is to study and develop a business dealing method based on network economy between the contractors. The network can comprise of chipping- and/or forest machine- and/or transport contractors. The project consists of research and demonstration parts. Research contains two research areas. The first examines possible forms of co-operation between the contractors and concentrates on description of the business connection arrangements, sharing of commercial risk and resources and distribution of income. The second research area contains description of network logistics: crude material and information streams. The method that has been created will be tested in practice during the demonstration part. Demonstration also contains preparation of quality systems for separate contractors and the whole network. If the network method is functional it can be multiplied to common use. (orig.)

  2. Solar heating and cooling demonstration project at the Florida solar energy center

    Science.gov (United States)

    1980-01-01

    The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. The system was designed to supply approximately 70 percent of the annual cooling and 100 percent of the heating load. The project provides unique high temperature, nonimaging, nontracking, evacuated tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection. Information is provided on the system's acceptance test results operation, controls, hardware and installation, including detailed drawings.

  3. A framework for monitoring and evaluating carbon mitigation by farm forestry projects. Example of a demonstration project in Chiapas, Mexico

    Energy Technology Data Exchange (ETDEWEB)

    De Jong, B.H.J. [El Colegio de la Frontera Sur, Chiapas (Mexico); Tipper, R. [Institute of Ecology and Resource Management, University of Edinburgh, Edinburgh (United Kingdom); Taylor, J. [Union de Credito `Pajal Ya Kac Tic`, Chiapas (Mexico)

    1997-10-01

    In Mexico an estimated 4.5 x 10{sup 6} ha are available for farm forestry, while up to 6.1 x 10{sup 6} ha could be saved from deforestation by making shifting agriculture more productive and sustainable. Various farm forestry systems are technically, socially, and economically viable, including live fences, coffee with shade trees, plantations, tree enrichment of fallows, and taungya, with a C-sequestration potential varying from 17.6 to 176.3 Mg C ha{sup -1}. A self-reporting system with on-site spot checks is presented for the monitoring and evaluation (M and E), and will be tested in a farm forestry C-sequestration pilot project, to begin in Chiapas, Mexico, in 1997. The M and E procedure will facilitate the collection of field data at low cost, help ensure that the system continue to address the needs of farmers, and give farmers an understanding of the value of the service that they are providing. 4 figs., 3 tabs., 20 refs.

  4. Science Experiments on File. Experiments, Demonstrations and Projects for School and Home.

    Science.gov (United States)

    Tyler, Vicki, Ed.

    This book, addressed to students for their independent use as well as to teachers as a supplement to the standard texts, contains nearly 100 practical science experiments that cover a wide range of subjects at different grade and ability levels. It is designed to involve students in active scientific experimentation, demonstrations, and projects…

  5. 42 CFR 403.308 - State systems under demonstration projects-mandatory approval.

    Science.gov (United States)

    2010-10-01

    ...-mandatory approval. 403.308 Section 403.308 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... Reimbursement Control Systems § 403.308 State systems under demonstration projects—mandatory approval. CMS will... approval of a State system are met under § 403.304 (b)(1)-(10) and § 403.304(c), and, if appropriate §...

  6. An Analysis of 1-Year Impacts of Youth Transition Demonstration Projects

    Science.gov (United States)

    Fraker, Thomas M.; Luecking, Richard G.; Mamun, Arif A.; Martinez, John M.; Reed, Deborah S.; Wittenburg, David C.

    2016-01-01

    This article examines the impacts of the Youth Transition Demonstration, an initiative of the Social Security Administration (SSA) to improve employment outcomes for youth with disabilities. Based on a random assignment design, the analysis uses data from a 1-year follow-up survey and SSA administrative records for 5,203 youth in six research…

  7. The AX-PET project Demonstration of a high resolution axial 3D PET

    CERN Document Server

    Bolle, E; Casella, C; Chesi, E; Clinthorne, N; Cochran, E; De Leo, R; Dissertori, G; Djambazov, G; Fanti, V; Honscheid, K; Huh, S; Johnson, I; Joram, C; Kagan, H; Lustermann, W; Meddi, F; Nappi, E; Nessi-Tedaldi, F; Oliver, J F; Pauss, P; Rafecas, M; Renker, D; Rudge, A; Schinzel, D; Schneider, T; Seguinot, J; Smith, S; Solevi, P; Stapnes, S; Weilhammer, P

    2010-01-01

    The AX-PET is a new geometrical concept for a high resolution 3D PET scanner, based on matrices of axially oriented LYSO crystals interleaved by stacks of WLS, both individually read out by G-APDs. A PET demonstrator, based on two detector modules used in coincidence, is currently under construction.

  8. 78 FR 10610 - TRICARE; Demonstration Project for Participation in Maryland Multi-Payer Patient Centered Medical...

    Science.gov (United States)

    2013-02-14

    ... Department of Defense (DoD) Enhanced Access to Patient Centered Medical Home (PCMH): Participation in Maryland Multi-payer Patient Centered Medical Home Program (MMPCMHP). DATES: The demonstration program will... strengthen the provider-patient relationship by replacing episodic care with coordinated care and a...

  9. Bus Routes, Marta Bus Routes located in Transportation database, Published in unknown, City of Roswell, GA.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Bus Routes dataset as of unknown. It is described as 'Marta Bus Routes located in Transportation database'. Data by this publisher are often provided in State...

  10. Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project: Phytoremediation Along the 100-N Columbia River Riparian Zone

    Energy Technology Data Exchange (ETDEWEB)

    Ainsworth, Calvin C.

    2006-04-30

    The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto¬remediation as a potential technology both for the removal of 90Sr from the soil of the riparian zone and as a filter for groundwater along the Columbia River. Recent greenhouse and growth chamber studies have demonstrated the viability of phytoextraction to remove 90Sr from this area’s soil/water; in conjunction with monitored natural attenuation and an apatite barrier the process would make an effective treatment for remediation of the 100-N Area 90Sr plume. All activities associated with the 100-NR-1 and 100-NR-2 Operable Units of the Hanford 100-N Area have had, and continue to have, significant regulatory and stakeholder participation. Beginning in 1998 with the ITRD process, presentations to the ITRD TAG were heavily attended by EPA, Washington State Department of Ecology, and stakeholders. In addition, three workshops have been held to receive regulatory and stakeholder feedback on monitored natural attenuation, the apatite barrier, and phytoremediation; these were held in Richland in August 2003, December 2004, and August 2005. The apatite injection treatability test plan (DOE 2005) describes phytoremediation as a technology to be evaluated during the March 2008 evaluation milestone as described in the Tri-Party Agreement change request (M-16-06-01 Change Control Form). If, during this evaluation milestone, phytoremediation is favorably evaluated it would be incorporated into the treatability test plan. The phytoremediation treatability test described in this proposal is strongly supported by the Washington State Department of Ecology.

  11. YUTONG BUS: Grateful To The Financial Crisis

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    Shenyin&Wanguo Securities issued an announcement on Jan 9 rating Yutong Bus(600066)as"buying",on the basis that the bus maker's gross profits went better in the last quarter of 2008 and to be further improved in the first quarter of 2009,with an increased market share. The report drew attention inside the in- dustry when the entire bus segment was suffering a tough time.

  12. Green River Formation Water Flood Demonstration Project: Final report. [October 21, 1992-April, 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Deo, M.D. [Dept. of Chemical and Fuels Engineering, University of Utah, Salt Lake City (US); Dyer, J.E.; Lomax, J.D. [Inland Resources, Inc., Lomax Exploration Co., Salt Lake City, UT (US); Nielson, D.L.; Lutz, S.J. [Energy and Geoscience Institute at the University of Utah, Salt Lake City (US)

    1996-11-01

    The objectives were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. Comprehensive reservoir characterization and reservoir simulations of the Monument Butte, Travis and Boundary units were presented in the two published project yearly reports. The primary and the secondary production from the Monument Butte unit were typical of oil production from an undersaturated oil reservoir close to its bubble point. The water flood in the smaller Travis unit appeared affected by natural and possibly by large interconnecting hydraulic fractures. Water flooding the boundary unit was considered more complicated due to the presence of an oil water contact in one of the wells. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter c ore, Formation Micro Imaging logs from several wells and Magnetic Resonance Imaging logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir characterization efforts identified new reservoirs in the Travis and the Boundary units. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2000 barrels per day.

  13. Demonstrating leadership inside and out : green building project trains employees, educates clients

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-01-15

    This article described a full-scale green renovation project undertaken by a construction management firm in Newton, Massachusetts. Chapman Construction and Design began renovating its own office building in late 2007 and completed it in September 2008. The firm set out to achieve LEED Platinum certification from the United States Green Building Council. The project involved energy saving modifications to its mechanical systems; replacing plumbing fixtures with high efficiency alternatives to reduce water consumption by at least 40 per cent; installing skylights and additional windows to allow more natural light into the interior space; salvaging doors, lighting, metal studs and masonry whenever possible; and using sustainable products such as recyclable carpets, tiles and low-VOC paint. The main feature of the renovation was a new 47 kW (DC) photovoltaic (PV) solar power array installed on the rooftop. The PV array includes 208 panels and a SunPower SPR-225 system that produces 55,000 kWh of clean power per year. This grid connected system will supply 90 per cent of the company's electricity needs. During times of peak production, excess power will be sent back to the utility. This article also described the 3 different roofing systems upon which the PV system was installed. All of the roofing systems were manufactured by the Firestone Building Products Company and included an innovative and highly reflective white thermoplastic polyolefin (TPO) single-ply roofing system; a RubberGard EPDM roofing system that was coated with Firestone's white AcryliTop coating which exceeds Energy Star requirements for energy efficiency; and a 1.5 mm Firestone UltraPly TPO membrane. The easy to install roofing systems were designed to prolong the service life of the roof and reflect solar radiation. 1 ref., 2 figs.

  14. NREL/SCE High-Penetration PV Integration Project: Report on Field Demonstration of Advanced Inverter Functionality in Fontana, CA

    Energy Technology Data Exchange (ETDEWEB)

    Mather, B.

    2014-08-01

    The National Renewable Energy Laboratory/Southern California Edison High-Penetration PV Integration Project is (1) researching the distribution system level impacts of high-penetration photovoltaic (PV) integration, (2) determining mitigation methods to reduce or eliminate those impacts, and (3) seeking to demonstrate these mitigation methods on actual high-penetration PV distribution circuits. This report describes a field demonstration completed during the fall of 2013 on the Fontana, California, study circuit, which includes a total of 4.5 MW of interconnected utility-scale rooftop PV systems. The demonstration included operating a 2-MW PV system at an off-unity power factor that had been determined during previously completed distribution system modeling and PV impact assessment analyses. Data on the distribution circuit and PV system operations were collected during the 2-week demonstration period. This demonstration reinforces the findings of previous laboratory testing that showed that utility-scale PV inverters are capable of operating at off-unity power factor to mitigate PV impacts; however, because of difficulties setting and retaining PV inverter power factor set points during the field demonstration, it was not possible to demonstrate the effectiveness of off-unity power factor operation to mitigate the voltage impacts of high-penetration PV integration. Lessons learned from this field demonstration are presented to inform future field demonstration efforts.

  15. Environmental assessmental, geothermal energy, Heber geothermal binary-cycle demonstration project: Imperial County, California

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The proposed design, construction, and operation of a commercial-scale (45 MWe net) binary-cycle geothermal demonstration power plant are described using the liquid-dominated geothermal resource at Heber, Imperial County, California. The following are included in the environmental assessment: a description of the affected environment, potential environmental consequences of the proposed action, mitigation measures and monitoring plans, possible future developmental activities at the Heber anomaly, and regulations and permit requirements. (MHR)

  16. Waste-to-Energy: Hawaii and Guam Energy Improvement Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Davis, J.; Gelman, R.; Tomberlin, G.; Bain, R.

    2014-03-01

    The National Renewable Energy Laboratory (NREL) and the U.S. Navy have worked together to demonstrate new or leading-edge commercial energy technologies whose deployment will support the U.S. Department of Defense (DOD) in meeting its energy efficiency and renewable energy goals while enhancing installation energy security. This is consistent with the 2010 Quadrennial Defense Review report1 that encourages the use of 'military installations as a test bed to demonstrate and create a market for innovative energy efficiency and renewable energy technologies coming out of the private sector and DOD and Department of Energy laboratories,' as well as the July 2010 memorandum of understanding between DOD and the U.S. Department of Energy (DOE) that documents the intent to 'maximize DOD access to DOE technical expertise and assistance through cooperation in the deployment and pilot testing of emerging energy technologies.' As part of this joint initiative, a promising waste-to-energy (WTE) technology was selected for demonstration at the Hickam Commissary aboard the Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. The WTE technology chosen is called high-energy densification waste-to-energy conversion (HEDWEC). HEDWEC technology is the result of significant U.S. Army investment in the development of WTE technology for forward operating bases.

  17. Wishbone Bus Architecture - A Survey and Comparison

    Directory of Open Access Journals (Sweden)

    Mohandeep Sharma

    2012-05-01

    Full Text Available The performance of an on-chip interconnection architecture used for communication between IP cores depends on the efficiency of its bus architecture. Any bus architecture having advantages of faster bus clock speed, extra data transfer cycle, improved bus width and throughput is highly desirable for a low cost, reduced time-to-market and efficient System-on-Chip (SoC. This paper presents a survey of WISHBONE bus architecture and its comparison with three other on-chip bus architectures viz. Advanced Microcontroller Bus Architecture (AMBA by ARM, CoreConnect by IBM and Avalon by Altera. The WISHBONE Bus Architecture by Silicore Corporation appears to be gaining an upper edge over the other three bus architecture types because of its special performance parameters like the use of flexible arbitration scheme and additional data transfer cycle (Read-Modify-Write cycle. Moreover, its IP Cores are available free for use requiring neither any registration nor any agreement or license.

  18. Real life testing of a Hybrid PEM Fuel Cell Bus

    Science.gov (United States)

    Folkesson, Anders; Andersson, Christian; Alvfors, Per; Alaküla, Mats; Overgaard, Lars

    Fuel cells produce low quantities of local emissions, if any, and are therefore one of the most promising alternatives to internal combustion engines as the main power source in future vehicles. It is likely that urban buses will be among the first commercial applications for fuel cells in vehicles. This is due to the fact that urban buses are highly visible for the public, they contribute significantly to air pollution in urban areas, they have small limitations in weight and volume and fuelling is handled via a centralised infrastructure. Results and experiences from real life measurements of energy flows in a Scania Hybrid PEM Fuel Cell Concept Bus are presented in this paper. The tests consist of measurements during several standard duty cycles. The efficiency of the fuel cell system and of the complete vehicle are presented and discussed. The net efficiency of the fuel cell system was approximately 40% and the fuel consumption of the concept bus is between 42 and 48% lower compared to a standard Scania bus. Energy recovery by regenerative braking saves up 28% energy. Bus subsystems such as the pneumatic system for door opening, suspension and brakes, the hydraulic power steering, the 24 V grid, the water pump and the cooling fans consume approximately 7% of the energy in the fuel input or 17% of the net power output from the fuel cell system. The bus was built by a number of companies in a project partly financed by the European Commission's Joule programme. The comprehensive testing is partly financed by the Swedish programme "Den Gröna Bilen" (The Green Car). A 50 kW el fuel cell system is the power source and a high voltage battery pack works as an energy buffer and power booster. The fuel, compressed hydrogen, is stored in two high-pressure stainless steel vessels mounted on the roof of the bus. The bus has a series hybrid electric driveline with wheel hub motors with a maximum power of 100 kW. Hybrid Fuel Cell Buses have a big potential, but there are

  19. Spinal projections from the lower brain stem in the cat as demonstrated by the horseradish peroxidase technique. II. Projections from the dorsolateral pontine tegmentum and raphe nuclei.

    Science.gov (United States)

    Tohyama, M; Sakai, K; Touret, M; Salvert, D; Jouvet, M

    1979-11-02

    The descending projections to the spinal cord arising from the dorsolateral pontine tegmentum and brain stem raphe nuclei have been investigated by means of the horseradish peroxidase (HRP) technique. Particular attention was taken to clarify the cells of origin and the funicular trajectory of these spinal projections. After injections of HRP into the spinal cord, a significant of HRP labeled neurons were observed in the following dorsolateral pontine tegmental structures: (1) an area ventral to the nucleus cuneiformis; (2) principal locus coeruleus; (3) locus coeruleus a; (4) locuse subcoeruleus; (5) Kölliker-Fuse nucleus; and (6) nucleus parabrachialis lateralis. As a rule, the projections are ipsilateral and descendaphe-spinal projections, we have demonstrated that the nucleus raphe dorsalis also sends axons to the cervical segment of the spinal cord. Furthermore, in accord with previous reports, HRP labeled cells were also identified in the nucleus raphe magnus, pallidus and obscurus, but not in the nucleus raphe centralis superior and pontis. On the whole the present study further clarified the organization of spinal projections from the dorsolateral pons and raphe nuclei and provided some additional anatomical data for the physiology of the tegmentospinal and raphe-spinal projections.

  20. EU demonstration project for separate discharge and treatment of urine, faeces and greywater--part I: results.

    Science.gov (United States)

    Peter-Fröhlich, A; Pawlowski, L; Bonhomme, A; Oldenburg, M

    2007-01-01

    The main aim of this EU demonstration project was to test two new sanitation concepts to determine if these concepts are more sustainable, compared with the conventional sanitation system, particularly with regard to nutrient recycling. Two different sanitation concepts were tested. One concept comprised the use of gravity separation toilets, the other used vacuum separation toilets. Results from a life-cycle-assessment investigation show that the new sanitation concepts are more sustainable. A cost analysis for an existing residential area did not prove lower costs for the new sanitation concepts in this special case. The experience from this demonstration project shows that prior to a widespread use of the new sanitation concepts, several improvements have to be made. One important issue is the improvement of separation toilets. Since nutrient recycling, water saving and reuse as well energy reduction become more and more important, further research should be undertaken in this field.

  1. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project. 1989 Annual report, [January 1989--December 1989

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    The report summarizes unit operating experience and test program progress for 1989 on Colorado-Ute Electric Association`s Nucla CFB Demonstration Program. During this period, the objectives of the Nucla Station operating group were to correct problems with refractory durability, resolve primary air fan capacity limitations, complete the high ash and high sulfur coal tests, switch to Salt Creek coal as the operating fuel, and make the unit available for testing without capacity restrictions. Each of these objectives was addressed and accomplished, to varying degrees, except for the completion of the high sulfur coal acceptance tests. (VC)

  2. Nucla circulating atmospheric fluidized bed demonstration project. Quarterly technical progress report, October--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  3. Performance-Based Technology Selection Filter description report. INEL Buried Waste Integrated Demonstration System Analysis project

    Energy Technology Data Exchange (ETDEWEB)

    O`Brien, M.C.; Morrison, J.L.; Morneau, R.A.; Rudin, M.J.; Richardson, J.G.

    1992-05-01

    A formal methodology has been developed for identifying technology gaps and assessing innovative or postulated technologies for inclusion in proposed Buried Waste Integrated Demonstration (BWID) remediation systems. Called the Performance-Based Technology Selection Filter, the methodology provides a formalized selection process where technologies and systems are rated and assessments made based on performance measures, and regulatory and technical requirements. The results are auditable, and can be validated with field data. This analysis methodology will be applied to the remedial action of transuranic contaminated waste pits and trenches buried at the Idaho National Engineering Laboratory (INEL).

  4. Initial results from the Solar Dynamic (SD) Ground Test Demonstration (GTD) project at NASA Lewis

    Science.gov (United States)

    Shaltens, Richard K.; Boyle, Robert V.

    1995-01-01

    A government/industry team designed, built, and tested a 2 kWe solar dynamic space power system in a large thermal/vacuum facility with a simulated sun at the NASA Lewis Research Center. The Lewis facility provides an accurate simulation of temperatures, high vacuum, and solar flux as encountered in low earth orbit. This paper reviews the goals and status of the Solar Dynamic (SD) Ground Test Demonstration (GTD) program and describes the initial testing, including both operational and performance data. This SD technology has the potential as a future power source for the International Space Station Alpha.

  5. The P2-Cottbus test and demonstration project; Versuchs- und Demonstrationsbauvorhaben P2-Cottbus

    Energy Technology Data Exchange (ETDEWEB)

    Fuerst, W. [Institut fuer Erhaltung und Modernisierung von Bauwerken e.V., Berlin (Germany); Braeunig, K.U. [Technische Univ. Dresden (Germany)

    1997-12-31

    The paper is a compilation of the essential results, experiences and problems encountered during the finalized first measuring period with the following measurements: measurements in order to establish the actual condition of the building prior to its modernization, control measurements in connection with the start of operation and adjustment of the building`s heating and ventilation system, and measurements for the valuation of energy conservation measures. Further, some results of measurements from the current, second, measurement period are reported. All measuring results are to be considered as preliminary, as the project will not be finalized before 31 December 1997. (MSK) [Deutsch] Der Beitrag enthaelt eine Zusammenstellung wesentlicher Ergebnisse, Erfahrungen und Probleme aus der abgeschlossenen ersten Messperiode mit folgenden Messungen: Messungen im Zusammenhang mit der Analyse des Istzustandes vom Versuchsgebaeude vor der Sanierung, Kontrollmessungen im Zusammenhang mit der Inbetriebnahme und Einregulierung der Heizung und Lftung des Gebaeudes sowie Messungen zur Untersuchung und Bewertung der energetischen Sanierungsnahmen. Ausserdem sind Ergebnisse der z.Z. laufenden zweiten Messperiode enthalten. Alle Ergebnisse sind mit dem Attribut ``vorlaeufig`` versehen, da das Projekt fruehestens am 31.12.97 abgeschlossen sein wird.

  6. The Hands-On Optics Project: a demonstration of module 3-magnificent magnifications

    Science.gov (United States)

    Pompea, Stephen M.; Sparks, Robert T.; Walker, Constance E.

    2014-07-01

    The Hands-On Optics project offers an example of a set of instructional modules that foster active prolonged engagement. Developed by SPIE, OSA, and NOAO through funding from the U.S. National Science Foundation, the modules were originally designed for afterschool settings and museums. However, because they were based on national standards in mathematics, science, and technology, they were easily adapted for use in classrooms. The philosophy and implementation strategies of the six modules will be described as well as lessons learned in training educators. The modules were implementing with the help of optics industry professionals who served as expert volunteers to assist educators. A key element of the modules was that they were developed around an understanding of optics misconceptions and used culminating activities in each module as a form of authentic assessment. Thus student achievement could be measured by evaluating the actual product created by each student in applying key concepts, tools, and applications together at the end of each module. The program used a progression of disciplinary core concepts to build an integrated sequence and crosscutting ideas and practices to infuse the principles of the modern electro-optical field into the modules. Whenever possible, students were encouraged to experiment and to create, and to pursue inquiry-based approaches. The result was a program that had high appeal to regular as well as gifted students.

  7. Fuel Gas Demonstration Plant Program: Small-Scale Industrial Project. Environmental assessment statement

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    Solid, liquid, and gaseous by-products and wastes are generated during coal storage and processing, gasification, and gas cleanup. Recovery systems have been designed to collect and utilize by-products. Wastes will be placed in storage areas designed to prevent release of the materials to the environment. The coal gasification plant along with the solid waste disposal area will occupy approximately 115 acres. To prevent, to the fullest extent possible, degradation of groundwater and surface water resources, the coal stockpile, landfill, collection pond, settling basin, and drainage ditches will be constructed to prevent the seepage of potential contaminants into groundwater or the drainage of runoff into surface waters. Cooling water is the primary water requirement of the project. None of the water utilized in the gasification plant will be released into the area surface water system, but will be either recycled or directed into the settling basin. The gasification facility has the potential of emitting a broad spectrum of pollutants into the atmosphere. However, effective emission control procedures such as off-gas recycling, hydrogen sulfide removal, particulate removal, and flaring will be applied to minimize the plant's emissions. The necessity of monitoring the more exotic pollutants such as acid gases, trace elements, metal carbonyls, and a multitude of organic compounds, will be determined as the gasification facility becomes more of a reality and the latest literature and research developments can be surveyed to evaluate the emission rates, biological significance, and monitoring techniques for these pollutants.

  8. Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Page, Janie; Kiliccote, Sila; Dudley, Junqiao Han; Piette, Mary Ann; Chiu, Albert K.; Kellow, Bashar; Koch, Ed; Lipkin, Paul

    2011-07-01

    Small and medium commercial customers in California make up about 20-25% of electric peak load in California. With the roll out of smart meters to this customer group, which enable granular measurement of electricity consumption, the investor-owned utilities will offer dynamic prices as default tariffs by the end of 2011. Pacific Gas and Electric Company, which successfully deployed Automated Demand Response (AutoDR) Programs to its large commercial and industrial customers, started investigating the same infrastructures application to the small and medium commercial customers. This project aims to identify available technologies suitable for automating demand response for small-medium commercial buildings; to validate the extent to which that technology does what it claims to be able to do; and determine the extent to which customers find the technology useful for DR purpose. Ten sites, enabled by eight vendors, participated in at least four test AutoDR events per site in the summer of 2010. The results showed that while existing technology can reliably receive OpenADR signals and translate them into pre-programmed response strategies, it is likely that better levels of load sheds could be obtained than what is reported here if better understanding of the building systems were developed and the DR response strategies had been carefully designed and optimized for each site.

  9. Large-scale Demonstration and Deployment Project for D&D of Fuel Storage Canals and Associated Facilities at INEEL

    Energy Technology Data Exchange (ETDEWEB)

    Whitmill, Larry Joseph

    2001-12-01

    The Department of Energy (DOE) Office of Science and Technology (OST), Deactivation and Decommissioning Focus Area (DDFA), sponsored a Large Scale Demonstration and Deployment Project (LSDDP) at the Idaho National Engineering and Environmental Laboratory (INEEL) under management of the DOE National Energy Technology Laboratory (NETL). The INEEL LSDDP is one of several LSDDPs sponsored by DOE. The LSDDP process integrates field demonstrations into actual decontamination and decommissioning (D&D) operations by comparing new or improved technologies against existing baseline technologies using a side-by-side comparison. The goals are (a) to identify technologies that are cheaper, safer, faster, and cleaner (produce less waste), and (b) to incorporate those technologies into D&D baseline operations. The INEEL LSDDP reviewed more than 300 technologies, screened 141, and demonstrated 17. These 17 technologies have been deployed a total of 70 times at facilities other than those where the technology was demonstrated, and 10 have become baseline at the INEEL. Fifteen INEEL D&D needs have been modified or removed from the Needs Management System as a direct result of using these new technologies. Conservatively, the ten-year projected cost savings at the INEEL resulting from use of the technologies demonstrated in this INEEL LSDDP exceeds $39 million dollars.

  10. The adaptive optics and transmit system for NASA's Laser Communications Relay Demonstration project

    Science.gov (United States)

    Roberts, Lewis C.; Burruss, Rick; Fregoso, Santos; Herzog, Harrison; Piazzola, Sabino; Roberts, Jennifer E.; Spiers, Gary D.; Truong, Tuan N.

    2016-09-01

    The Laser Communication Relay Demonstration is NASA's multi-year demonstration of laser communication to a geosynchronous satellite. We are currently assembling the optical system for the first of the two baseline ground stations. The optical system consists of an adaptive optics system, the transmit system and a camera for target acquisition. The adaptive optics system is responsible for compensating the downlink beam for atmospheric turbulence and coupling it into the modem's single mode fiber. The adaptive optics system is a woofer/tweeter design, with one deformable mirror correcting for low spatial frequencies with large amplitude and a second deformable mirror correcting for high spatial frequencies with small amplitude. The system uses a Shack- Hartmann wavefront sensor. The transmit system relays four beacon beams and one communication laser to the telescope for propagation to the space terminal. Both the uplink and downlink beams are centered at 1.55 microns. We present an overview of the design of the system as well as performance predictions including time series of coupling efficiency and expected uplink beam quality.

  11. El Dorado Micellar-Polymer Demonstration Project. Second annual report, July 1975--May 1976

    Energy Technology Data Exchange (ETDEWEB)

    Rosenwald, G.W. (ed.)

    1976-07-01

    Laboratory oil displacement tests were conducted using Shell Oil Co. and Union Oil Co. chemical formulations in both Berea and El Dorado Admire Sandstone cores. Total relative mobility of the oil-water bank created during chemical flooding was measured in Admire Sandstone cores. The values ranged from 0.018 to 0.065 reciprocal centipoise. Four observation wells were drilled, cored, and logged during the year. They were cased with fiberglass and are now being used to monitor fluid properties. A tracer test was conducted by injection of chemical tracers into each of the 18 injection wells. Results indicate that there is no gross channeling in the reservoir. The same conclusion was drawn from results of interference tests. Performance forecasting was utilized to show that maintaining the bottom-hole injection pressures at 400 psia and the producing pressures at 30 psia would increase throughput rates and result in acceptable project life for the 6.4-acre, five-spot patterns. Injection well rates relative to the central injector were computed. These rates will be used as a guide for the operation of injection wells. This plan corresponds to operation at constant bottom-hole pressures for a homogeneous reservoir of uniform thickness. Construction of the fresh water system and injection plant was completed. The injection plant has performed satisfactorily. Injection of pretreatment fluid was started in both patterns on November 18, 1975.Severe loss of injectivity was experienced during the first week of injection. Several likely causes were identified and corrective actions taken. More moderate injectivity problems have continued throughout this reporting period. Additional preventive measures have been undertaken to improve the quality of injected fluids. A procedure was developed to stimulate and clean-up wells damaged by the injection fluid. A preliminary evaluation indicates that combination solvent-acid treatments will increase injection rates to the desired level.

  12. Coalinga polymer demonstration project. Fourth annual report, July 1978-July 1979

    Energy Technology Data Exchange (ETDEWEB)

    Schultz, V.

    1980-09-01

    A field demonstration test of displacement mobility control in the East Coalinga Field is being conducted in order to determine the relative merits of polymer flooding and waterflooding in a medium viscosity oil reservoir. The injection pattern consists of four inverted 5-spot patterns and an updip area. Water injection began in June 1976 and continued through April 1978. Polymer injection began in May 1978 and is ongoing. The overall production performance for the pilot has been far less than expected. The current oil production rate is currently below the expected primary decline rate. The polymer injection rate is substantially below original predictions and will increase the time required to inject the designed slug volume.

  13. A new bus lane on urban expressway with no-bay bus stop

    Science.gov (United States)

    Tian, Zhao; Jia, Limin

    2016-01-01

    The sharp increase in residents and vehicles causes heavy traffic pressure in many cities. To ease traffic congestion, it has been the common sense that we should develop public transit system. The priority of the bus appears particularly necessary with the rapid development of the public transport system. The bus lane is an important embodiment of the bus priority. Focusing on the problem of the unreasonable dedicated bus lane (DBL) under the lower ratio of buses, this paper proposed a new bus lane with limited physical length. And this bus lane can reduce the lane-changing conflict caused by the buses and cars running on roads without bus lanes. Based on the cellular automata (CA) traffic flow model and the lane-changing behavior of the vehicle including the optional lane-changing and the mandatory lane-changing, a three-lane traffic model with an isolated no-bay bus stop is proposed. The ordinary three-lane traffic without a bus lane and the cases of traffic with a DBL or the proposed bus lane are simulated, and the comparisons in the form of the fundamental diagrams are made among them. It is shown that the no-bay bus stop can act as a bottleneck on the traffic flow because of the mandatory lane-changing behavior. Under a certain ratio of the bus number to the total vehicles number, (1) the traffic with the proposed bus lane has less lane-changing conflict and can provide higher traffic capacity than the ordinary traffic without a bus lane, (2) compared with the DBL, the proposed bus lane is advantageous in easing congestion on the ordinary lanes when the traffic flow is high and can avoid unreasonable allocation of the road resources.

  14. Road safety issues for bus transport management.

    Science.gov (United States)

    Cafiso, Salvatore; Di Graziano, Alessandro; Pappalardo, Giuseppina

    2013-11-01

    Because of the low percentage of crashes involving buses and the assumption that public transport improves road safety by reducing vehicular traffic, public interest in bus safety is not as great as that in the safety of other types of vehicles. It is possible that less attention is paid to the significance of crashes involving buses because the safety level of bus systems is considered to be adequate. The purpose of this study was to evaluate the knowledge and perceptions of bus managers with respect to safety issues and the potential effectiveness of various technologies in achieving higher safety standards. Bus managers were asked to give their opinions on safety issues related to drivers (training, skills, performance evaluation and behaviour), vehicles (maintenance and advanced devices) and roads (road and traffic safety issues) in response to a research survey. Kendall's algorithm was used to evaluate the level of concordance. The results showed that the majority of the proposed items were considered to have great potential for improving bus safety. The data indicated that in the experience of the participants, passenger unloading and pedestrians crossing near bus stops are the most dangerous actions with respect to vulnerable users. The final results of the investigation showed that start inhibition, automatic door opening, and the materials and internal architecture of buses were considered the items most strongly related to bus passenger safety. Brake assistance and vehicle monitoring systems were also considered to be very effective. With the exception of driver assistance systems for passenger and pedestrian safety, the perceptions of the importance of other driver assistance systems for vehicle monitoring and bus safety were not unanimous among the bus company managers who participated in this survey. The study results showed that the introduction of new technologies is perceived as an important factor in improving bus safety, but a better understanding

  15. Final Technical Report: Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Grasman

    2011-12-31

    This report summarizes the work conducted under U.S. Department of Energy (DOE) under contract DE-FC36-04GO14285 by Mercedes-Benz & Research Development, North America (MBRDNA), Chrysler, Daimler, Mercedes Benz USA (MBUSA), BP, DTE Energy and NextEnergy to validate fuel cell technologies for infrastructure, transportation as well as assess technology and commercial readiness for the market. The Mercedes Team, together with its partners, tested the technology by operating and fueling hydrogen fuel cell vehicles under real world conditions in varying climate, terrain and driving conditions. Vehicle and infrastructure data was collected to monitor the progress toward the hydrogen vehicle and infrastructure performance targets of $2.00 to 3.00/gge hydrogen production cost and 2,000-hour fuel cell durability. Finally, to prepare the public for a hydrogen economy, outreach activities were designed to promote awareness and acceptance of hydrogen technology. DTE, BP and NextEnergy established hydrogen filling stations using multiple technologies for on-site hydrogen generation, storage and dispensing. DTE established a hydrogen station in Southfield, Michigan while NextEnergy and BP worked together to construct one hydrogen station in Detroit. BP constructed another fueling station in Burbank, California and provided a full-time hydrogen trailer at San Francisco, California and a hydrogen station located at Los Angeles International Airport in Southern, California. Stations were operated between 2005 and 2011. The Team deployed 30 Gen I Fuel Cell Vehicles (FCVs) in the beginning of the project. While 28 Gen I F-CELLs used the A-Class platform, the remaining 2 were Sprinter delivery vans. Fuel cell vehicles were operated by external customers for real-world operations in various regions (ecosystems) to capture various driving patterns and climate conditions (hot, moderate and cold). External operators consisted of F-CELL partner organizations in California and Michigan

  16. Multi Resolution AHB Bus Tracer with Real Time Compression for SOC

    Directory of Open Access Journals (Sweden)

    J. Jagadish Reddy

    2013-01-01

    Full Text Available AMBA (Advanced Microcontroller based Bus Architecture consists of AHB, APB, ASB and AXI. In this project we are Tracing AHB (Advanced High performance Bus signals with Real time Compression and Multi-resolution Techniques. A simple transaction on the AHB consists of an address phase and a subsequent data phase. Access to the target device is controlled through a MUX , thereby admitting bus-access to one bus-master at a time. In AHB Tracer we have to Trace Address signals, Data signals and Control signals, we have to compress them depending on AHB protocols. A multi-resolution AHB on-chip bus tracer is named as SYS_HMRBT (AHB Multi-resolution Bus Tracer and is used for monitoring. The goal is to provide better compression quality and multiple resolution traces to meet the complex SoC debugging needs. Compressing all signals at cycle-accurate-level does not always meet the debugging needs. As SOCs become more complex, the transaction level debugging becomes increasingly important, since it helps designers focus on the functional behaviors, instead of interpreting complex signals. By using this SYS_HMRBT, we can achieve 79%-96% of compression depending on selected resolution mode. Tools Used for this Project are Modelsim for Simulation, and Xilinx ISE II for Synthesis

  17. Interim Report: Uranium Stabilization Through Polyphosphate Injection - 300 Area Uranium Plume Treatability Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Wellman, Dawn M.; Pierce, Eric M.; Richards, Emily L.; Butler, Bart C.; Parker, Kent E.; Glovack, Julia N.; Burton, Sarah D.; Baum, Steven R.; Clayton, Eric T.; Rodriguez, Elsa A.

    2007-07-31

    This report presents results from bench-scale treatability studies conducted under site-specific conditions to optimize the polyphosphate amendment for implementation of a field-scale technology demonstration to treat aqueous uranium within the 300 Area aquifer of the Hanford site. The general treatability testing approach consists of conducting studies with site sediment and under site conditions, in order to develop an effective chemical formulation for the polyphosphate amendments and evaluate the transport properties of these amendments under site conditions. Phosphorus-31 (31P) NMR was utilized to determine the effects of Hanford groundwater and sediment on the degradation of inorganic phosphates. Static batch tests were conducted to optimize the composition of the polyphosphate formulation for the precipitation of apatite and autunite, as well as to quantify the kinetics, loading and stability of apatite as a long-term sorbent for uranium. Dynamic column tests were used to further optimize the polyphosphate formulation for emplacement within the subsurface and the formation of autunite and apatite. In addition, dynamic testing quantified the stability of autunite and apatite under relevant site conditions. Results of this investigation provide valuable information for designing a full-scale remediation of uranium in the 300 aquifer.

  18. The Eight-Year Study: From Evaluative Research to a Demonstration Project, 1930—1940.

    Directory of Open Access Journals (Sweden)

    Joseph Watras

    2006-08-01

    Full Text Available From 1932 to 1940, the Progressive Education Association (PEA conducted its Eight-Year Study. At first, the study appeared to be a poorly funded comparison of two groups of students in secondary schools. During the last four years, as more financial support became available, the Eight-Year Study became a broadly based demonstration of a wide range of educational innovations. For contemporary educators, the story of the Eight-Year Study represents an opportunity to reconsider popular principles of program evaluation such as utilization-focused evaluation or program theory in evaluation. Rather than set plans in advance, the PEA members seemed to follow the ideas of John Dewey; they allowed the purposes to widen and broaden as the study evolved. In this way, the Eight-Year Study represented a model of democratic policy evaluation. Its tentative type of planning allowed people to set and to change their own purposes in line with the needs of the wider organization. Part of the reason that the study changed direction was it gathered more financial support and could add consultants who worked in distinct program elements. In addition, the lack of consistency matched the varied nature that characterized the founding members of the PEA. Its democratic framework may have enabled the Eight-Year Study to become the PEA’s abiding contribution to American education.

  19. Baca geothermal demonstration project baseline ecosystem studies of cooling tower emission effects

    Energy Technology Data Exchange (ETDEWEB)

    Leitner, P.; Osterling, R.; Price, D.; Westermeier, J.

    1981-03-01

    Results of baseline studies for boron, arsenic, mercury, and fluorine in vegetation and soil near the Baca Geothermal Demonstration Power Plant are provided for the 1980 sampling season. Preliminary results of visual vegetation assessments and population density studies of soil invertebrate fauna are also provided. Foliage samples were collected for chemical analysis on a total of 17 plots on 5 transects. Two to five plant species were sampled at each plot. Samples were collected in June-July and September. Soil samples were collected at each plot during September. Visual vegetation inspections were conducted along each transect. Eighty-eight soil samples were collected for soil invertebrate studies. Boron, arsenic, mercury, and fluorine levels in vegetation were within normal range for natural vegetation and crops. Concentrations of soil arsenic and mercury were comparable to foliage concentrations. Boron concentrations were lower in soil than in foliage, whereas soil fluorine concentrations were considerably higher than foliage concentrations. With the exception of heavy insect infestations in June-July, no vegetation abnormalities were noted. Preliminary soil invertebrate analysis indicated an overall arthropod density of approximately 100,000/m/sup 2/ which appears within the normal range encountered in forest and meadow soil.

  20. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Richmond Elementary School in Susanville, CA Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Richmond Elementary School in Susanville, CA. The objectives of the project were to evaluate: (1) the effectiveness of an Aquatic Treatme...

  1. Designing Sustainable Public Transportation: Integrated Optimization of Bus Speed and Holding Time in a Connected Vehicle Environment

    Directory of Open Access Journals (Sweden)

    Wei Wu

    2016-11-01

    Full Text Available Developing public transportation and giving priority to buses is a feasible solution for improving the level of public transportation service, which facilitates congestion alleviation and prevention, and contributes to urban development and city sustainability. This paper presents a novel bus operation control strategy including both holding control and speed control to improve the level of service of transit systems within a connected vehicle environment. Most previous work focuses on optimization of signal timing to decrease the bus signal delay by assuming that holding control is not applied; the speed of buses is given as a constant input and the acceleration and deceleration processes of buses can be neglected. This paper explores the benefits of a bus operation control strategy to minimize the total cost, which includes bus signal delay, bus holding delay, bus travel delay, acceleration cost due to frequent stops and intense driving. A set of formulations are developed to explicitly capture the interaction between bus holding control and speed control. Experimental analysisand simulation tests have shown that the proposed integrated operational model outperforms the traditional control, speed control only, or holding control only strategies in terms of reducing the total cost of buses. The sensitivity analysis has further demonstrated the potential effectiveness of the proposed approach to be applied in a real-time bus operation control system under different levels of traffic demand, bus stop locations, and speed limits.

  2. Toward Elimination of Dog-Mediated Human Rabies: Experiences from Implementing a Large-scale Demonstration Project in Southern Tanzania

    Science.gov (United States)

    Mpolya, Emmanuel Abraham; Lembo, Tiziana; Lushasi, Kennedy; Mancy, Rebecca; Mbunda, Eberhard M.; Makungu, Selemani; Maziku, Matthew; Sikana, Lwitiko; Jaswant, Gurdeep; Townsend, Sunny; Meslin, François-Xavier; Abela-Ridder, Bernadette; Ngeleja, Chanasa; Changalucha, Joel; Mtema, Zacharia; Sambo, Maganga; Mchau, Geofrey; Rysava, Kristyna; Nanai, Alphoncina; Kazwala, Rudovick; Cleaveland, Sarah; Hampson, Katie

    2017-01-01

    A Rabies Elimination Demonstration Project was implemented in Tanzania from 2010 through to 2015, bringing together government ministries from the health and veterinary sectors, the World Health Organization, and national and international research institutions. Detailed data on mass dog vaccination campaigns, bite exposures, use of post-exposure prophylaxis (PEP), and human rabies deaths were collected throughout the project duration and project areas. Despite no previous experience in dog vaccination within the project areas, district veterinary officers were able to implement district-wide vaccination campaigns that, for most part, progressively increased the numbers of dogs vaccinated with each phase of the project. Bite exposures declined, particularly in the southernmost districts with the smallest dog populations, and health workers successfully transitioned from primarily intramuscular administration of PEP to intradermal administration, resulting in major cost savings. However, even with improved PEP provision, vaccine shortages still occurred in some districts. In laboratory diagnosis, there were several logistical challenges in sample handling and submission but compared to the situation before the project started, there was a moderate increase in the number of laboratory samples submitted and tested for rabies in the project areas with a decrease in the proportion of rabies-positive samples over time. The project had a major impact on public health policy and practice with the formation of a One Health Coordination Unit at the Prime Minister’s Office and development of the Tanzania National Rabies Control Strategy, which lays a roadmap for elimination of rabies in Tanzania by 2030 by following the Stepwise Approach towards Rabies Elimination (SARE). Overall, the project generated many important lessons relevant to rabies prevention and control in particular and disease surveillance in general. Lessons include the need for (1) a specific unit in the

  3. Demonstration of a forward iterative method to reconstruct brachytherapy seed configurations from x-ray projections

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, Martin J; Todor, Dorin A [Department of Radiation Oncology, Virginia Commonwealth University, Richmond VA 23298 (United States)

    2005-06-07

    By monitoring brachytherapy seed placement and determining the actual configuration of the seeds in vivo, one can optimize the treatment plan during the process of implantation. Two or more radiographic images from different viewpoints can in principle allow one to reconstruct the configuration of implanted seeds uniquely. However, the reconstruction problem is complicated by several factors: (1) the seeds can overlap and cluster in the images; (2) the images can have distortion that varies with viewpoint when a C-arm fluoroscope is used; (3) there can be uncertainty in the imaging viewpoints; (4) the angular separation of the imaging viewpoints can be small owing to physical space constraints; (5) there can be inconsistency in the number of seeds detected in the images; and (6) the patient can move while being imaged. We propose and conceptually demonstrate a novel reconstruction method that handles all of these complications and uncertainties in a unified process. The method represents the three-dimensional seed and camera configurations as parametrized models that are adjusted iteratively to conform to the observed radiographic images. The morphed model seed configuration that best reproduces the appearance of the seeds in the radiographs is the best estimate of the actual seed configuration. All of the information needed to establish both the seed configuration and the camera model is derived from the seed images without resort to external calibration fixtures. Furthermore, by comparing overall image content rather than individual seed coordinates, the process avoids the need to establish correspondence between seed identities in the several images. The method has been shown to work robustly in simulation tests that simultaneously allow for unknown individual seed positions, uncertainties in the imaging viewpoints and variable image distortion.

  4. Demonstration of a forward iterative method to reconstruct brachytherapy seed configurations from x-ray projections

    Science.gov (United States)

    Murphy, Martin J.; Todor, Dorin A.

    2005-06-01

    By monitoring brachytherapy seed placement and determining the actual configuration of the seeds in vivo, one can optimize the treatment plan during the process of implantation. Two or more radiographic images from different viewpoints can in principle allow one to reconstruct the configuration of implanted seeds uniquely. However, the reconstruction problem is complicated by several factors: (1) the seeds can overlap and cluster in the images; (2) the images can have distortion that varies with viewpoint when a C-arm fluoroscope is used; (3) there can be uncertainty in the imaging viewpoints; (4) the angular separation of the imaging viewpoints can be small owing to physical space constraints; (5) there can be inconsistency in the number of seeds detected in the images; and (6) the patient can move while being imaged. We propose and conceptually demonstrate a novel reconstruction method that handles all of these complications and uncertainties in a unified process. The method represents the three-dimensional seed and camera configurations as parametrized models that are adjusted iteratively to conform to the observed radiographic images. The morphed model seed configuration that best reproduces the appearance of the seeds in the radiographs is the best estimate of the actual seed configuration. All of the information needed to establish both the seed configuration and the camera model is derived from the seed images without resort to external calibration fixtures. Furthermore, by comparing overall image content rather than individual seed coordinates, the process avoids the need to establish correspondence between seed identities in the several images. The method has been shown to work robustly in simulation tests that simultaneously allow for unknown individual seed positions, uncertainties in the imaging viewpoints and variable image distortion.

  5. A Demonstration Project in New York and Virginia: Retrofitting Cost-Effective Roll-over Protective Structures (CROPS) on Tractors.

    Science.gov (United States)

    Hard, D L; McKenzie, E A; Cantis, D; May, J; Sorensen, J; Bayes, B; Madden, E; Wyckoff, S; Stone, B; Maass, J

    2015-07-01

    The NIOSH cost-effective roll-over protective structure (CROPS) demonstration project sought to determine whether three prototype roll-over protective structures (ROPS) designed to be retrofitted on Ford 8N, Ford 3000, Ford 4000, and Massey Ferguson 135 tractors could be installed in the field and whether they would be acceptable by the intended end users (farmers). There were a total of 50 CROPS. demonstrators (25 in New York and 25 in Virginia), with 45 observers attending the New York CROPS demonstrations and 36 observers attending the Virginia CROPS demonstrations, for a total of 70 participants in New York and 61 in Virginia. The oldest retrofitted tractors were 77 to 62 years old, while the newest retrofitted tractors were 40 to 37 years old. The most frequently retrofitted tractor in the CROPS demonstration project was a Ford 3000 series tractor (n = 19; 38%), followed by Ford 4000 (n = 11; 22%), Massey Ferguson 135 (n = 11; 22%), and Ford 8N (n = 9; 18%). A major issue of CROPS retrofitting was the rear wheel fenders. The effort involved in disassembling the fenders (removing the old bolts was often faster by cutting them with a torch), modifying the fender mounting brackets, and then reinstalling the fenders with the CROPS generally required the most time. In addition, various other semi-permanent equipment attachments, such as front-end loaders, required additional time and effort to fit with the CROPS. Demonstrators were asked to rank the reasons why they had not retrofitted their tractors with ROPS until they had enrolled in the CROPS demonstration program. ROPS "cost too much" was ranked as the primary reason for participants in both states (80% for New York and 88% for Virginia). The second highest ranked reasons were "ROPS wasn't available" for Virginia (80%) and "hassle to find ROPS" for New York (69%). The third highest ranked reasons were "not enough time to find ROPS" for New York (67%) and "hassle to find ROPS" for Virginia (79%). All

  6. Design of intelligent bus stop based on GPRS

    Institute of Scientific and Technical Information of China (English)

    张思远

    2013-01-01

    To provide people waiting on the bus stop the information about the number of passengers on the bus traffic and distance between the site and the running bus. Design a set of intelligent bus stop system. This system counts up the number of the people gets on the bus and the people getting out of the bus to add up the people on the bus by infrared sensor and uses the hall sensor to measure the distance of having driven. Then, send data via GPRS. Finally display on the corresponding bus stop.

  7. Hiding Solar-Array Bus Bars

    Science.gov (United States)

    Hufnagel, W. F.

    1983-01-01

    End terminals mounted under cells, maximizing usable illuminated area. Reconfigured solar panel bus bars placed under cells, reducing portion of module area not occupied by active silicon. Underside of last cell in string of cells serves as contact for positive bus. Negative tab of last cell in string is wrapped around from top of cell. Tabs are connected to output boards mounted under cells.

  8. Mastering NServiceBus and persistence

    CERN Document Server

    Helton, Rich

    2014-01-01

    This book is intended for developers, designers, and architects alike who wish to build C# NServiceBus enterprise architectures and learn how ESB persists data and messages to help them attain their goals. No prior knowledge of persistence in NServiceBus is required.

  9. From the hybrid bus to the fully electrical bus; Vom Hybridbus zum vollelektrischen Bus

    Energy Technology Data Exchange (ETDEWEB)

    Soffel, Christian [VCDB VerkehrsConsult Dresden-Berlin GmbH, Dresden (Germany). Team Elektromobilitaet

    2013-05-15

    To an increasing extent, hybrid buses have become omnipresent in conurbations as far as public transport is concerned. However, they are only an intermediate stage on the path to the fully electrical bus. The development path has been marked out and depends on the progress made in energy storage technology and automobile industry. From an economic point of view, practicable and adequate funding measures are required for the time being for precisely arranging electromobility in public transport and thus before an audience of millions. (orig.)

  10. Product acceptance of a certified Class C low-level waste form at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Valenti, P.J. [West Valley Nuclear Services Co., Inc., NY (United States); Maestas, E.; Yeazel, J.A. [Dept. of Energy, West Valley, NY (United States). West Valley Project Office; McIntosh, T.W. [Dept. of Energy, Washington, DC (United States). Office of Remedial Action and Waste Technology

    1989-11-01

    The Department of Energy, is charged with the solidification of high-level liquid waste (HLW) remaining from nuclear fuel reprocessing activities, which were conducted at West Valley, New York between 1966 and 1972. One important aspect of the West Valley Demonstration Project`s fully integrated waste program is the treatment and conditioning of low-level wastes which result from processing liquid high-level waste. The treatment takes place in the project`s Integrated Radwaste Treatment System which removes Cesium-137 from the liquid or supernatant phase of the HLW by utilizing an ion exchange technique. The resulting decontaminated and conditioned liquid waste stream is solidified into a Class C low-level cement waste form that meets the waste form criteria specified in NRC 10 CFR 61. The waste matrix is placed in 71-gallon square drums, remotely handled and stored on site until determination of final disposition. This paper discusses the programs in place at West Valley to ensure production of an acceptable cement-based product. Topics include the short and long term test programs to predict product storage and disposal performance, description of the Process Control Plan utilized to control and maintain cement waste form product specifications and finally discuss the operational performance characteristics of the Integrated Radwaste Treatment System. Operational data and product statistics are provided.

  11. Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3.

  12. Advanced Flue Gas Desulfurization (AFGD) Demonstration Project. Technical progress report No. 15, July 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.

  13. Demonstration of random projections applied to the retrieval problem of geophysical parameters from hyper-spectral infrared observations.

    Science.gov (United States)

    Serio, Carmine; Masiello, Guido; Liuzzi, Giuliano

    2016-08-20

    The random projections statistical technique has been used to reduce the dimensionality of the radiance data space generated from high spectral resolution infrared observations. The mathematical inversion of the physical radiative transfer equation for geophysical parameters has been solved in this space of reduced dimensionality. The great advantage of using random projections is that they provide an unified treatment of instrument noise and forward model error, which can be comprehensively modeled with a single variance term. The result is a novel retrieval approach, which combines computational efficiency to possibly improved accuracy of the retrieval products. The novel approach has been demonstrated through application to the Infrared Atmospheric Sounding Interferometer. We have found that state-of-the-art spectroscopy and related line-mixing treatment for the ν2CO2 absorption band, i.e., the fundamental band for temperature retrieval, show an excellent consistency with satellite observations.

  14. Development and implementation of the cross-site evaluation of the CDC/HRSA corrections demonstration project.

    Science.gov (United States)

    Arriola, Kimberly R Jacob; Kennedy, Sofia S; Coltharp, J Cameron; Braithwaite, Ronald L; Hammett, Theodore M; Tinsley, Melinda J

    2002-06-01

    U.S. prisons and jails have the nation's highest concentration of individuals infected with and at risk for HIV infection. Many correctional institutions offer 1-HIV care, but advances are oftentimes lost when individuals with a lack of health insurance and access to care are released into the community. In 1999 the Centers for Disease Control and Prevention and the Health Resources and Services Administration jointly funded seven health departments to address this need. These projects target soon-to-be-released inmates of jails, prisons, and juvenile facilities and offer enhanced discharge planning, case management, HIV prevention, disease screening, and staff training. The Evaluation and Program Support Center (EPSC) at Emory University and Abt Associates was funded to oversee a cross-site evaluation of these demonstration projects. This paper describes the process of developing a cross-site evaluation, the implementation of this evaluation, and lessons learned by the EPSC throughout this process.

  15. TIDD PFBC Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    In fluidized bed combustion, coal and sorbent (dolomite or limestone) are fed into a boiler in which air, entering from the bottom, maintains the bed material in a highly turbulent suspended state called fluidization. This turbulence creates good contact between the air and fuel, allowing for high combustion efficiency and excellent adsorption of sulfur dioxide (SO{sub 2}) during the combustion process. In PFBC applications, pressurized air is supplied to the combustor. Pressurizing the air concentrates a larger quantity of oxygen per unit volume. This results in a lower velocity of air through the fuel bed. The lower velocity reduces the total height required for the bed and freeboard above the bed. Also, a smaller plan area is required for the bed area as compared to an atmospheric fluidized bed. This has the advantage of requiring a much smaller pressure vessel to contain the boiler enclosure. The mean bed temperature of a pressurized fluidized bed combustor is typically maintained in the range 1540 to 1580 F. This is well below the ash fusion temperature of coal, yet above the ignition temperature of the coal. Advantages of the low bed temperature are no slag formation and a reduction of NO{sub x} emissions to less than half that of a conventional boiler. The Tidd Plant is a combined cycle pressurized fluidized bed combustion system with a topping gas cycle and a bottoming steam cycle.

  16. Big Muddy Field low-tension flood-demonstration project. Fifth annual report, April 1982-March 1983

    Energy Technology Data Exchange (ETDEWEB)

    Painter, T.R.; Borah, M.T.; Ferrell, H.H.

    1983-08-01

    The Big Muddy low-tension flood is a commercial-size demonstration project consisting of nine 10-acre injection patterns in the heart of the Big Muddy Oil Field located 15 miles east of Casper, Wyoming. The main goal of the project is to provide data for commercialization of the process for the Big Muddy Field and similar Wyoming and Colorado fields. This report discusses the project performance during the last part of slug injection with particular emphasis on the analysis of the early oil response and the injectivity. Other work discussed in this report includes the pilot testing for an oil-treating facility which led to a new design. The oil production rate increased from about 75 BPD at year-end 1981 to about 170 BPD, or from about 4 percent to about 11 percent of the injection rate, in March of 1983. During the same period, the produced oil cut increased from 2 percent to about 5 percent. The low-tension slug injection was completed in August 1982 and injection of a polymer solution having the same mobility is continuing. The total low-tension slug volume was 873,000 barrels or 10.2 percent pore volume. 4 references, 91 figures, 19 tables.

  17. A demonstration of remote survey and characterization of a buried waste site using the SRIP (Soldier Robot Interface Project) testbed

    Energy Technology Data Exchange (ETDEWEB)

    Burks, B.L.; Richardson, B.S.; Armstrong, G.A.; Hamel, W.R.; Jansen, J.F.; Killough, S.M.; Thompson, D.H.; Emery, M.S.

    1990-01-01

    During FY 1990, the Oak Ridge National Laboratory (ORNL) supported the Department of Energy (DOE) Environmental Restoration and Waste Management (ER WM) Office of Technology Development through several projects including the development of a semiautonomous survey of a buried waste site using a remotely operated all-terrain robotic testbed borrowed from the US Army. The testbed was developed for the US Army's Human Engineering Laboratory (HEL) for the US Army's Soldier Robot Interface Project (SRIP). Initial development of the SRIP testbed was performed by a team including ORNL, HEL, Tooele Army Depot, and Odetics, Inc., as an experimental testbed for a variety of human factors issues related to military applications of robotics. The SRIP testbed was made available to the DOE and ORNL for the further development required for a remote landfill survey. The robot was modified extensively, equipped with environmental sensors, and used to demonstrate an automated remote survey of Solid Waste Storage Area No. 3 (SWSA 3) at ORNL on Tuesday, September 18, 1990. Burial trenches in this area containing contaminated materials were covered with soil nearly twenty years ago. This paper describes the SRIP testbed and work performed in FY 1990 to demonstrate a semiautonomous landfill survey at ORNL. 5 refs.

  18. Ornamental Marine Species Culture in the Coral Triangle: Seahorse Demonstration Project in the Spermonde Islands, Sulawesi, Indonesia

    Science.gov (United States)

    Williams, Susan L.; Janetski, Noel; Abbott, Jessica; Blankenhorn, Sven; Cheng, Brian; Crafton, R. Eliot; Hameed, Sarah O.; Rapi, Saipul; Trockel, Dale

    2014-12-01

    Ornamental marine species (`OMS') provide valuable income for developing nations in the Indo-Pacific Coral Triangle, from which most of the specimens are exported. OMS culture can help diversify livelihoods in the region, in support of management and conservation efforts to reduce destructive fishing and collection practices that threaten coral reef and seagrass ecosystems. Adoption of OMS culture depends on demonstrating its success as a livelihood, yet few studies of OMS culture exist in the region. We present a case study of a land-based culture project for an endangered seahorse ( Hippocampus barbouri) in the Spermonde Islands, Sulawesi, Indonesia. The business model demonstrated that culturing can increase family income by seven times. A Strengths Weaknesses Opportunities Threats (SWOT) analysis indicated good collaboration among diverse stakeholders and opportunities for culturing non-endangered species and for offshoot projects, but complicated permitting was an issue as were threats of market flooding and production declines. The OMS international market is strong, Indonesian exporters expressed great interest in cultured product, and Indonesia is the largest exporting country for H. barbouri. Yet, a comparison of Indonesia ornamental marine fish exports to fish abundance in a single local market indicated that OMS culture cannot replace fishing livelihoods. Nevertheless, seahorse and other OMS culture can play a role in management and conservation by supplementing and diversifying the fishing and collecting livelihoods in the developing nations that provide the majority of the global OMS.

  19. StarBus+: Distributed Object Middleware Practice for Internet Computing

    Institute of Scientific and Technical Information of China (English)

    Huai-Min Wang; Yu-Feng Wang; Yang-Bin Tang

    2005-01-01

    In the past decade, the booming of Internet challenges the middleware in three aspects: quality of service,balance of changes and stabilization, and across-Internet integration. This paper presents our work on distributed object computing middleware technology for these challenges, as well as the research and development on StarBus+, which is a CORBA standard-compliant middleware suite with the features such as object request broker supporting multi-* quality of service, component model, and integration with Web Service. This paper comprehensively presents the design and characteristics of StarBns+, and demonstrates how StarBus+ is enhanced to address the challenges of Internet computing through three case studies: inter-enterprise integration over Internet, application evolution through dynamic reconfiguration,and great massive information system building. The paper also suggests some research directions which are important for Internet computing.

  20. Bus Encoder for Crosstalk Avoidance in RLC Modeled Interconnects

    Directory of Open Access Journals (Sweden)

    G. Nagendra Babu

    2012-02-01

    Full Text Available Most of the encoding methods proposed in recent years have dealt with only RC modeled VLSI interconnects. For deep sub micron technologies (DSM, on-chip inductive effects have increased due to faster clock speeds, smaller signal rise times and longer length of on-chip interconnects. All these issues raise the concern for cross talk, propagation delay and power dissipation of overall. Therefore, this research work introduces an efficient Bus Encoder using Bus Inverting (BI method. The proposed design dramatically reduces both cross talk and power dissipation in RLC modeled interconnects which makes it suitable for current high-speed low-power VLSI interconnects. The proposed model demonstrates an overall reduction of power dissipation and cross talk induced delay by 55.43% and 45.87%, respectively.

  1. Technology Update of a Control System Trough Corba Bus

    CERN Document Server

    Bertocchi, A; Buceti, G; Centioli, C; Muzio, D D; Iannone, F; Mazza, G; Panella, M; Vitale, V

    2001-01-01

    After more than 10 years of activity, FTU (Frascati Tokamak Upgrade) has to face the problem of taking advantage of the new hardware and software technology saving all the investments yet done. So, for example, the 20 years old Westinghouse PLCs (communicating only through a serial line) have to be leaved in operation while a web-based tool has to be released for plan monitoring purpose. CORBA bus has been demonstrated to be the answer to set up the communication between old and new hardware and software blocks. On FTU the control system is based on Basestar, a Digital/Compaq software suite. We will describe how the real time database of Basestar is now accessed by Java graphic tools, LabView and, in principle, any package accepting external routines. An account will be also done in the data acquisition area where a Camac serial highway driver has been integrated in the new architecture still through the CORBA bus

  2. FAST BUS Test Box (LAIKA) (Engineering Materials)

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    The assembly drawing AD 135-518-00-RO, and the drawings referenced thereon, provide the data and specifications for constructing the LAIKA Test Box. Some drawings are not available, although they are listed on the material lists included. The assembly is a manual tester for FAST BUS modules, both masters and slaves. FAST BUS signals are generated by means of switches or push buttons and provide the state of the bus lines by lighting LED's. The box acts as either a master or slave - depending upon the module under test. It also acts as an ATC to test the arbitration logic of a master or ATC device.

  3. Drivetrain system of an ultracapacitor electric bus

    Institute of Scientific and Technical Information of China (English)

    Kong Zhigu; Zhu Chunbo; Yang Shiyan; Cheng Shukang

    2007-01-01

    This paper proposed a design of the drivetrain system of an electric bus with ultracapacitor (UC) as the only on-board power source. The system includes three main parts, namely, UC bank, motor and the converter, vehicle management unit (VMU). Analyses results in detail on the functional design and experiments on work bench of each part were also presented, which validated the reliability of the system. Furthermore, driving results in field of the bus verified the feasibility of the design of the drivetrain system. The bus has very good dynamic performances and shows a promising applications prospect in the short and medium route buses system.

  4. Radiation-Tolerant Dual Data Bus

    Science.gov (United States)

    Kinstler, Gary A.

    2007-01-01

    An architecture, and a method of utilizing the architecture, have been proposed to enable error-free operation of a data bus that includes, and is connected to, commercial off-the-shelf (COTS) circuits and components that are inherently susceptible to singleevent upsets [SEUs (bit flips caused by impinging high-energy particles and photons)]. The architecture and method are applicable, more specifically, to data-bus circuitry based on the Institute for Electrical and Electronics Engineers (IEEE) 1394b standard for a high-speed serial bus.

  5. BUS 1000母线保护的应用%Application of BUS 1000 Bus-Bar Protection

    Institute of Scientific and Technical Information of China (English)

    马晓光; 张贵金; 冷雪玉

    2001-01-01

    发电厂的母线是电厂中的一个重要组成元件,当母线上发生故障时,将使连接在故障母线上的所有元件在修复故障母线期间,或转换到另一组母线上运行以前遭到停电。同时还可能破坏系统稳定,造成严重后果。因此,母线保护装置是正确迅速切除母线故障的重要装置,它的拒动或误动将给电力系统带来严重危害。详细介绍了华能丹东发电厂350 MW发电机组采用的BUS 1000型母线保护的原理,并对其正常运行及区内、外故障、断路器失灵保护、母联断路器过流保护等几个方面作了详细分析。%Bus bar is an important component in e lectric power plant.When bus bar fault occurs,all components connected on the fa ulty bus bar will be in outage until power restores by repairing the faulty bus bar or switching them over to another bus bar.Furthermore,it may cause the destr uction of system stability resulting in serious consequence.Bus bar protection d evice is the very device to quickly remove bus bar faults,and its malfunctioning will bring serious harm to power system. The principle of BUS 1000 bus bar prot ection used for 350 MW unit of dandong power plant is introduced.Its normal oper ation and several aspects,such as in-and out-area faults,out-of-order breake r protection,bus bar breaker over-current protection,are analyzed in detail.

  6. LIFAC Demonstration at Richmond Power and Light Whitewater Valley Unit No. 2 Volume II: Project Performance and Economics

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1998-04-01

    The C1ean Coal Technology (CCT) Program has been recognized in the National Energy Strategy as a major initiative whereby coal will be able to reach its full potential as a source of energy for the nation and the international marketplace. Attainment of this goal depends upon the development of highly efficient, environmentally sound, competitive coal utilization technologies responsive to diverse energy markets and varied consumer needs. The CCT Program is an effort jointly funded by government and industry whereby the most promising of the advanced coal-based technologies are being moved into the marketplace through demonstration. The CCT Program is being implemented through a total of five competitive solicitations. LIFAC North America, a joint venture partnership of ICF Kaiser Engineers, Inc., and Tampella Power Corporation, is currently demonstrating the LIFAC flue gas desulfurization technology developed by Tampella Power. This technology provides sulfur dioxide emission control for power plants, especially existing facilities with tight space limitations. Sulfur dioxide emissions are expected to be reduced by up to 85% by using limestone as a sorbent. The LIFAC technology is being demonstrated at Whitewater Valley Unit No. 2, a 60-MW coal-fired power plant owned and operated by Richmond Power and Light (RP&L) and located in Richmond, Indiana. The Whitewater plant consumes high-sulfur coals, with sulfur contents ranging from 2.0-2.9 $ZO. The project, co-funded by LIFAC North America and DOE, is being conducted with the participation of Richmond Power and Light, the State of Indiana, the Electric Power Research Institute (EPRI), and the Black Beauty Coal Company. The project has a total cost of $21.4 million and a duration of 48 months from the preliminary design phase through the testing program.

  7. The Northwest Geysers EGS Demonstration Project Phase 1: Pre-stimulation coupled geomechanical modeling to guide stimulation and monitoring plans

    Energy Technology Data Exchange (ETDEWEB)

    Rutqvist, J.; Dobson, P.F.; Oldenburg, C.M.; Garcia, J.; Walters, M.

    2010-10-20

    This paper presents activities and results associated with Phase 1 (pre-stimulation phase) of an Enhanced Geothermal System (EGS) demonstration project at the northwest part of The Geysers geothermal field, California. The paper presents development of a 3-D geological model, coupled thermal-hydraulic-mechanical (THM) modeling of proposed stimulation injection as well as current plans for stimulation and monitoring of the site. The project aims at creating an EGS by directly and systematically injecting cool water at relatively low pressure into a known High Temperature (about 280 to 350 C) Zone (HTZ) located under the conventional (240 C) steam reservoir at depths of {approx}3 km. Accurate micro-earthquake monitoring initiated before the start of the injection will be used as a tool for tracking the development of the EGS and monitoring changes in microseismicity. We first analyzed historic injection and micro-earthquake data from an injection well (Aidlin 11) located about 3 miles to the west of the new EGS demonstration area. Thereafter, we used the same modeling approach to predict the likely extent of the zone of enhanced permeability for a proposed initial injection in two wells (Prati State 31 and Prati 32) at the new EGS demonstration area. Our modeling indicates that the proposed injection scheme will provide additional steam production in the area by creating a zone of permeability enhancement extending about 0.5 km from each injection well which will connect to the overlying conventional steam reservoir, in agreement with the conclusions of Nielson and Moore (2000).

  8. Effect of periodic inflow on speed-controlled shuttle bus

    Science.gov (United States)

    Nagatani, Takashi

    2017-03-01

    We investigate the dynamic behavior of a shuttle bus controlled the speed when passengers come periodically at the origin. We propose the nonlinear-map model for the dynamics of the speed-controlled bus with the periodic inflow. The bus schedule is closely connected to the motion. The motion of the speed-controlled bus is affected by the periodic inflow. The motion of the shuttle bus depends highly on both speed control and periodic inflow. The shuttle bus displays the periodic, quasi-periodic, and chaotic motions by varying both periodic inflow and speed control. We clarify the dependence of the bus motion on both speed control and periodic inflow.

  9. Effect of speedup delay on shuttle bus schedule

    Science.gov (United States)

    Nagatani, Takashi

    2016-10-01

    We study the bus schedule in the shuttle bus transportation system controlled by speedup. The bus schedule is closely related to the dynamic motion of the bus. The motion of a shuttle bus depends on the inflow rate of passengers and the delayed speedup control. The delayed speedup control has an important effect on the dynamic motion of the bus. We present the delayed map model for the dynamics of the shuttle bus with the delayed speedup control. The bus motion changes from a stable state, through a periodic state, to a quasi-periodic state by the delayed speedup control. The return map of the tour time displays a smooth closed curve and the bus motion is quasi-periodic. The dynamic transition to the quasi-periodic motion changes greatly with the delay time. We clarify the effect of the delayed speedup control on the bus schedule.

  10. DESIGN AND EXPERIMENT OF ELECTRIC BUS

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    Performance and reliability experiments on BJD-6100EV electric buses, jointly developed by Beijing Institute of Technology and Beijing Public Transport Company, are introduced. Output power model of battery pack is established and maximum output power is analyzed. A permanent magnetic direct current (PMDC) motor with enhanced windings is developed for the bus. Torque-speed characteristics of the motor are modeled and performance of electric bus is analyzed. Computational method of the range of electric bus is proposed and discussed. Experiments show that electric bus can realize design requirements. Computational methods are verified with the help of field test. It is expected that design and computation method will provide helpful reference to development of electric vehicles.

  11. Demonstration Project for a Multi-Material Lightweight Prototype Vehicle as Part of the Clean Energy Dialogue with Canada

    Energy Technology Data Exchange (ETDEWEB)

    Skszek, Tim [Vehma International Of America, Inc., Troy, MI (United States)

    2015-12-29

    The intent of the Multi-Material Lightweight Vehicle (“MMLV”) was to assess the feasibility of achieving a significant level of vehicle mass reduction, enabling engine downsizing resulting in a tangible fuel reduction and environmental benefit. The MMLV project included the development of two (2) lightweight vehicle designs, referred to as Mach-I and Mach-II MMLV variants, based on a 2013 Ford production C/D segment production vehicle (Fusion). Weight comparison, life cycle assessment and limited full vehicle testing are included in the project scope. The Mach-I vehicle variant was comprised of materials and processes that are commercially available or previously demonstrated. The 363 kg mass reduction associated with the Mach-I design enabled use of a one-liter, three-cylinder, gasoline turbocharged direct injection engine, maintaining the performance and utility of the baseline vehicle. The full MMLV project produced seven (7) MMLV Mach-I “concept vehicles” which were used for testing and evaluation. The full vehicle tests confirmed that MMLV Mach-I concept vehicle performed approximately equivalent to the baseline 2013 Ford Fusion vehicle thereby validating the design of the multi material lightweight vehicle design. The results of the Life Cycle Assessment, conducted by third party consultant, indicated that if the MMLV Mach-I design was built and operated in North America for 250,000 km (155,343 miles) it would produce significant environmental and fuel economy benefits including a 16% reduction in Global Warming Potential (GWP) and 16% reduction in Total Primary Energy (TPE). The LCA calculations estimated the combined fuel economy of 34 mpg (6.9 l/100 km) associated with the MMLV Mach-I Design compared to 28 mpg (8.4 l/100 km) for the 2013 Ford Fusion.

  12. Integrated Gasification Combined Cycle (IGCC) demonstration project, Polk Power Station -- Unit No. 1. Annual report, October 1993--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This describes the Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project which will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,300 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 Btu/scf (LHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product.

  13. Sour gas plant remediation technology research and demonstration project, Task 7.53. Topical report, January--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Stepan, D.J.; Kuehnel, V.; Schmit, C.R.

    1994-02-01

    Recognizing the potential impacts of sour gas plant operations on the subsurface environment, the Canadian Association of Petroleum Producers (CAPP) and Environment Canada initiated a multiphase study focusing on research related to the development and demonstration of remedial technologies for soil and groundwater contamination at these facilities. Research performed under this project was designed to supplement and be coordinated with research activities being conducted at an operational sour gas plant located in Rocky Mountain House, Alberta, Canada. These research tasks included hydrogeological site characterization, subsurface contaminant characterization, ex situ treatment of groundwater, and subsurface remediation of residual contamination in the unsaturated zone. Ex situ treatment of groundwater included evaluations of air stripping, steam stripping, advanced oxidation, and biological treatment, as well as the development of an artificial freeze crystallization process. Soil vapor extraction was evaluated as a technique to address residual contamination in the unsaturated zone.

  14. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  15. Lessons Learned by Community Stakeholders in the Massachusetts Childhood Obesity Research Demonstration (MA-CORD) Project, 2013–2014

    Science.gov (United States)

    Ganter, Claudia; Aftosmes-Tobio, Alyssa; Chuang, Emmeline; Kwass, Jo-Ann; Land, Thomas

    2017-01-01

    Introduction Childhood obesity is a multifaceted disease that requires sustainable, multidimensional approaches that support change at the individual, community, and systems levels. The Massachusetts Childhood Obesity Research Demonstration project addressed this need by using clinical and public health evidence-based methods to prevent childhood obesity. To date, little information is known about successes and lessons learned from implementing such large-scale interventions. To address this gap, we examined perspectives of community stakeholders from various sectors on successes achieved and lessons learned during the implementation process. Methods We conducted 39 semistructured interviews with key stakeholders from 6 community sectors in 2 low-income communities from November 2013 through April 2014, during project implementation. Interviews were audio-recorded, transcribed, and analyzed by using the constant comparative method. Data were analyzed by using QSR NVivo 10. Results Successes included increased parental involvement in children’s health and education, increased connections within participating organizations and within the broader community, changes in organizational policies and environments to better support healthy living, and improvements in health behaviors in children, parents, and stakeholders. Lessons learned included the importance of obtaining administrative and leadership support, involving key stakeholders early in the program planning process, creating buffers that allow for unexpected changes, and establishing opportunities for regular communication within and across sectors. Conclusion Study findings indicate that multidisciplinary approaches support health behavior change and provide insight into key issues to consider in developing and implementing such approaches in low-income communities. PMID:28125400

  16. Perspective Application of Passive Optical Network with Optimized Bus Topology

    Directory of Open Access Journals (Sweden)

    P. Lafata

    2012-06-01

    Full Text Available Passive optical networks (PONs represent a promising solution for modern access telecommunication networks.These networks are able to meet the increasing demands on transmission rate for demanding multimedia services,while they can offer typical shared transmission speed of 1.25 or 2.5 Gbps. The major role in deploying opticaldistribution networks ODNs plays the maximum attenuable loss, which is caused mainly by passive optical splitters.This paper proposes an innovative application of passive optical networks with optimized bus topology especially forlocal backbone data networks. Due to using only passive components, it is necessary to optimize certain parameters,especially an overall attenuation balance. Considering the possibility of such optimization, the passive optical networkwith optimized bus topology provides several interesting opportunities for specific applications. This paper will presentselected aspects of passive optical networks and splitters with asymmetric splitting ratio. The essential part is focusedon the practical demonstration of their use to optimize the passive optical network with bus topology, which acts as alocal backbone network for structured cabling systems, and for local data networks in large buildings.

  17. Two 175 ton geothermal chiller heat pumps for leed platinum building technology demonstration project. Operation data, data collection and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Kolo, Daniel [Johnson Controls, Inc., Glendale, WI (United States)

    2016-08-15

    The activities funded by this grant helped educate and inform approximately six thousand individuals who participated in guided tours of the geothermal chiller plant at Johnson Controls Corporate Headquarters in Glendale, Wisconsin over the three year term of the project. In addition to those who took the formal tour, thousands more were exposed to hands-on learning at the self-service video kiosks located in the headquarters building and augmented reality tablet app that allowed for self-guided tours. The tours, video, and app focused on the advantages of geothermal heat pump chillers, including energy savings and environmental impact. The overall tour and collateral also demonstrated the practical application of this technology and how it can be designed into a system that includes many other sustainable technologies without sacrificing comfort or health of building occupants Among tour participants were nearly 1,000 individuals, representing 130 organizations identified as potential purchasers of geothermal heat pump chillers. In addition to these commercial clients, tours were well attended by engineering, facilities, and business trade groups. This has also been a popular tour for groups from Universities around the Midwest and K-12 schools from Wisconsin and Northern Illinois A sequence of operations was put into place to control the chillers and they have been tuned and maintained to optimize the benefit from the geothermal water loop. Data on incoming and outgoing water temperature and flow from the geothermal field was logged and sent to DOE monthly during the grant period to demonstrate energy savings.

  18. Dynamic Bus Travel Time Prediction Models on Road with Multiple Bus Routes.

    Science.gov (United States)

    Bai, Cong; Peng, Zhong-Ren; Lu, Qing-Chang; Sun, Jian

    2015-01-01

    Accurate and real-time travel time information for buses can help passengers better plan their trips and minimize waiting times. A dynamic travel time prediction model for buses addressing the cases on road with multiple bus routes is proposed in this paper, based on support vector machines (SVMs) and Kalman filtering-based algorithm. In the proposed model, the well-trained SVM model predicts the baseline bus travel times from the historical bus trip data; the Kalman filtering-based dynamic algorithm can adjust bus travel times with the latest bus operation information and the estimated baseline travel times. The performance of the proposed dynamic model is validated with the real-world data on road with multiple bus routes in Shenzhen, China. The results show that the proposed dynamic model is feasible and applicable for bus travel time prediction and has the best prediction performance among all the five models proposed in the study in terms of prediction accuracy on road with multiple bus routes.

  19. Sexual Harassment on the School Bus: Supporting and Preparing Bus Drivers to Respond Appropriately

    Science.gov (United States)

    Allen, Melissa; Young, Ellie L.; Ashbaker, Betty Y.; Heaton, Emily; Parkinson, Marisa

    2003-01-01

    Sexual harassment is commonplace in schools, particularly among adolescents. Although information on this topic is typically gathered from students and teachers, this study collected information from school bus drivers. Based on feedback from 58 school bus drivers, 39 (67%) reported observing students making sexual comments or jokes. Almost half…

  20. Bullying and Aggression on the School Bus: School Bus Drivers' Observations and Suggestions

    Science.gov (United States)

    deLara, Ellen

    2008-01-01

    Every school day bus drivers are responsible for transporting children safely over many miles, yet they are rarely polled for their opinions or contributions to school safety. School bus drivers are in a unique position to inform the discussion on aggressive behavior during the school day. This exploratory study collected information from school…

  1. Increasing Resiliency to Natural Hazards--A Strategic Plan for the Multi-Hazards Demonstration Project in Southern California

    Science.gov (United States)

    Jones, Lucy; Bernknopf, Richard; Cannon, Susan; Cox, Dale A.; Gaydos, Len; Keeley, Jon; Kohler, Monica; Lee, Homa; Ponti, Daniel; Ross, Stephanie; Schwarzbach, Steven; Shulters, Michael; Ward, A. Wesley; Wein, Anne

    2007-01-01

    Executive Summary The U.S. Geological Survey (USGS) is initiating a new project designed to improve resiliency to natural hazards in southern California through the application of science to community decision making and emergency response. The Multi-Hazards Demonstration Project will assist the region's communities to reduce their risk from natural hazards by directing new and existing research towards the community's needs, improving monitoring technology, producing innovative products, and improving dissemination of the results. The natural hazards to be investigated in this project include coastal erosion, earthquakes, floods, landslides, tsunamis, and wildfires. Americans are more at risk from natural hazards now than at any other time in our Nation's history. Southern California, in particular, has one of the Nation's highest potentials for extreme catastrophic losses due to natural hazards, with estimates of expected losses exceeding $3 billion per year. These losses can only be reduced through the decisions of the southern California community itself. To be effective, these decisions must be guided by the best information about hazards, risk, and the cost-effectiveness of mitigation technologies. The USGS will work with collaborators to set the direction of the research and to create multi-hazard risk frameworks where communities can apply the results of scientific research to their decision-making processes. Partners include state, county, city, and public-lands government agencies, public and private utilities, companies with a significant impact and presence in southern California, academic researchers, the Federal Emergency Management Agency (FEMA), National Oceanic and Atmospheric Administration (NOAA), and local emergency response agencies. Prior to the writing of this strategic plan document, three strategic planning workshops were held in February and March 2006 at the USGS office in Pasadena to explore potential relationships. The goal of these

  2. Sub-Area. 2.5 Demonstration of Promising Energy Storage Technologies Project Type. Flywheel Energy Storage Demonstration Revision: V1.0

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2015-12-30

    In this program, Amber Kinetics designed, built, and tested a sub-­scale 5 kWh engineering prototype flywheel system. Applying lessons learned from the engineering prototype, Amber Kinetics then designed, built and tested full-­size, commercial-­scale 25 kWh flywheel systems. The systems underwent basic functional qualification testing before being installed, sequentially, at the company’s outdoor test site in Alameda, CA for full-­speed field-testing. The primary considerations in testing the prototype units were to demonstrate the functionality of the system, verify the frequencies of resonant modes, and quantify spinning losses and motor/generator efficiency.

  3. Caustic waterflooding demonstration project: Ranger Zone, Long Beach Unit, Wilmington Field, California. Third annual report, June 1978-May 1979

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, E.H.

    1979-12-01

    A caustic-enhanced waterflooding pilot test is being conducted in the Ranger Reservoir of the Long Beach Unit, Wilmington Field, California. Evaluation of entrapment and entrainment caustic flooding in Ranger Zone cores was continued. The caustic-only (entrapment) core floods failed to demonstrate improved behavior. Based on the unfavorable results of all tests of the entrapment mechanism, further laboratory work and flooding in the pilot with caustic alone have been eliminated from the project's plans. Some of the year's caustic-salt (entrainment) core floods in contrast showed both substantial recovery and WOR improvement. The poorer overall entrainment core flood results obtained in the year may be due to the core material, a smaller preflush volume used or the crude oil employed. Core flood testing where sodium silicate is substituted for some of the sodium hydroxide, was continued. The primary set of caustic water-oil dehydration tests was completed. The test softening of produced waters was completed and the results evaluated; produced water softening was found to be an economically feasible alternative to the use of fresh water. The preflush injection facilities became operational in January 1979 with the pilot's preflush officially begun April 15, 1979. The alkaline injection facility was expanded in scope to permit use of both sodium silicate and sodium hydroxide; its completion in late 1979 is anticipated with the alkaline-salt injection scheduled to begin at that time. The base case reservoir simulator prediction of the pilot under continued waterflooding was completed. This prediction provided the base line from which incremental alkaline flood production will be determined, as the test has now been declared a qualified tertiary enhanced recovery project by DOE's Economic Regulatory Administration. Major well repair/redrill work continued to be necessary exceeding earlier increased cost estimates.

  4. The demonstration project of centralized biogas supply system for 500 households in Mei-long-jie-xin village, Shanghai city

    Energy Technology Data Exchange (ETDEWEB)

    Shenggen Cheng [Shanghai Biogas Production Co. (China)

    2000-07-01

    The biogas project in Mei-long-jie-xin village, Shanghai, mainly includes a 150 m{sup 3} hybrid digester and a 100 m{sup 3} deep-well-type digester with a floating gas holder. This biogas project was designed by Shanghai Biogas Production Company and is used to treat high concentration distillery wastewater. Fermentation temperature is 25 - 38 C. Daily biogas production is about 1,500 m{sup 3}, which is used as daily fuel for 500 local household residents and some civil enterprises such as a village tea-house, a primary school, a kindergarten, a village glass processing workshop in Mei-long-jie-xin village. Anaerobically digested effluent is post-treated through sedimentation, coagulation and solid/liquid separation. The COD concentration in the final effluent is already less than 350 mg/l, which could meet the requirements of the national wastewater discharge standards. In addition, separated fermentation sludge could be used as fish feed. The construction of this biogas installation started in October 1987 and was put into operation during the Chinese New Year, 1989. Initially, 230 households were connected but increased to 400 households by July of the same year. Based on this plan, by November 1990 a total of 500 households was expected to use biogas. This biogas plant is a measure to implement pollution control and re-utilize resources with considerable economic and social benefits. The successful construction of this demonstration biogas plant paved the way to extending biogas technology to suburban areas near big cities. (orig.)

  5. EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

    Energy Technology Data Exchange (ETDEWEB)

    Breen, B.J. [NDA, Herdus House, Westlakes Science and Technology Park, Moor Row, Cumbria, CA24 3HU (United Kingdom); Garcia-Sineriz, J.L. [AITEMIN, c/Margarita Salas 14-Parque Leganes Tecnologico-Leganes, ES-28918, Madrid (Spain); Maurer, H. [ETH Zurich, ETH Honggerberg, CH-8093, Zurich (Switzerland); Mayer, S. [ANDRA, 1-7 rue Jean-Monnet, F-92298 Chatenay-Malabry cedex (France); Schroeder, T.J. [NRG, P.O. Box 25, NL-1755 ZG Petten (Netherlands); Verstricht, J. [EURIDICE EIG, c/o SCK.CEN, Boeretang 200, BE-2400 Mol (Belgium)

    2012-07-01

    Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise

  6. FY'99 final report for the expedited technology demonstration project: demonstration test results for the MSO/off-gas and salt recycle system

    Energy Technology Data Exchange (ETDEWEB)

    Adamson, M G; Hsu, P C

    1999-05-01

    Molten Salt Oxidation (MSO) is a promising alternative to incineration for the treatment of a variety of organic wastes. Lawrence Livermore National Laboratory (LLNL) has prepared a facility in which an integrated pilot-scale MSO treatment system is being tested and demonstrated. The system consists of a MSO vessel with a dedicated off-gas treatment system, a salt recycle system, feed preparation equipment, and a ceramic final waste forms immobilization system. This integrated system was designed and engineered based on operational experience with an engineering-scale reactor unit and extensive laboratory development on salt recycle and final forms preparation. The MSO/off-gas system has been operational since December 1997. The salt recycle system and the ceramic final forms immobilization became operational in May 1998. In FY98, we have tested the MSO facility with various organic feeds, including chlorinated solvents, tributyl phosphate/kerosene, PCB-contaminated waste oils and solvents, booties, plastic pellets, ion exchange resins, activated carbon, radioactive-spiked organics, and well-characterized low-level liquid mixed wastes. MSO is shown to be a versatile technology for hazardous waste treatment and may be a solution to many waste disposal problems in DOE sites. The results of the demonstration conducted in FY98 has been reported [1]. In FY99 (October 1998 to April 1999) we conducted further testing in the MSO/off-gas system with ion exchange resins, two real waste specimens, activated carbon, and TNT-loaded activated carbon, both at regular feed rates and higher feed rates up to a superficial gas velocity of 1.75 ft/s. We also drained the salt three times (SR7, SR8, SR9) in FY99 and sent the spent salts to the salt recycle system for further processing. This report presents the results obtained from the demonstration of the MSO/off-gas system and the salt recycle system from October 1998 to April 1999. We then shut down the operation and cleaned the

  7. Arsenic Removal from Drinking Water by Iron Removal U.S. EPA Demonstration Project at Vintage on the Ponds in Delavan, WI Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Vintage on the Ponds in Delavan, WI. The objectives of the project were to evaluate: (1) the effectiveness of a Kinetico Macrolite® press...

  8. ARSENIC REMOVAL FROM DRINKING WATER BY PROCESS MODIFICATION TO COAGULATION/FILTRATION. USEPA DEMONSTRATION PROJECT AT LIDGERWOOD, ND. FINAL PERFORMANCE EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at the Lidgerwood, North Dakota site. The objectives of the project were to evaluate: (1) the effectiveness of process modifications to an e...

  9. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Village of Waynesville, IL - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal drinking water treatment technology demonstration project at the Village of Waynesville, IL. The main objective of the project was to evaluate the effectiveness of the Peerless coagu...

  10. Arsenic Removal from Drinking Water by Coagulation/Filtration, U.S. EPA Demonstration Project at the City of Okanogan, WA - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the City of Okanogan, WA facility. The objectives of the project were to evaluate: (1) the effectiveness of Filtronics’ FH-13 Ele...

  11. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Village of Pentwater, MI. Final performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the Village of Pentwater, MI facility. The objectives of the project were to evaluate: (1) the effectiveness of Kinetico’s FM-260...

  12. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Sandusky, MI. Six-Month Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the City of Sandusky, MI facility. The objectives of the project are to evaluate 1) the effectiveness of Siemen...

  13. Arsenic Removal from Drinking Water by Coagulation/Filtration - U.S. EPA Demonstration Project at Town of Arnaudville, LA - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the arsenic removal treatment technology demonstration project at the United Water Systems’ facility in Arnaudville, LA. The objectives of the project were to evaluate: (1) the effectiveness of K...

  14. Arsenic Removal from Drinking Water by Coagulation/Filtration U.S. EPA Demonstration Project at Sandusky, MI Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the U.S. Environmental Protection Agency (EPA) arsenic removal technology demonstration project at the City of Sandusky, MI facility. The objectives of the project were to evaluate: 1) the effect...

  15. The Final Report on the Tarrant County Junior College Phase of the Social Science Demonstration Project Sponsored by the American Association of Junior Colleges.

    Science.gov (United States)

    Platt, Robert M.

    An account of Tarrant Count Junior College's participation in the American Association of Junior Colleges' Social Science Demonstration Project was presented. The purpose of the project was to involve introductory sociology students in the use of the community as a laboratory to enliven the teaching-learning experience and develop in students a…

  16. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL AND ADSORPTIVE MEDIA USEPA DEMONSTRATION PROJECT AT STEWART, MN. SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the EPA arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project is to evaluate the effectiveness of Siemens¿ Type II AERALA...

  17. Arsenic Removal from Drinking Water by Iron Removal and Adsorptive Media U.S. EPA Demonstration Project at Stewart, MN, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the one-year U.S. Environmental Protection Agency (EPA) arsenic removal technology demonstration project at the Stewart, MN facility. The main objective of the project was to evaluate the effectiveness ...

  18. ARSENIC REMOVAL FROM DRINKING WATER BY POINT OF USE REVERSE OSMOSIS. EPA DEMONSTRATION PROJECT AT SUNSET RANCH DEVELOPMENT IN HOMEDALE, ID. SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the point of use arsenic removal treatment technology demonstration project at the Sunset Ranch Development in Homedale, ID. The objectives of the project are to evaluate t...

  19. Final Technical Report on STTR Project DE-FG02-06ER86282 Development and Demonstration of 6-Dimensional Muon Beam Cooling

    Energy Technology Data Exchange (ETDEWEB)

    Muons, Inc.

    2011-05-24

    The overarching purpose of this project was to prepare a proposal for an experiment to demonstrate 6-dimensional muon beam cooling. The technical objectives were all steps in preparing the proposal, which was successfully presented to the Fermilab Accelerator Advisory Committee in February 2009. All primary goals of this project have been met.

  20. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Webb Consolidated Independent School District in Bruni, TX - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the Webb Consolidated Independent School District (Webb CISD) in Bruni, TX. The main objective of the project was to evaluate the effect...

  1. Arsenic Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at Woodstock Middle School in Woodstock, CT - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed for and the results obtained from the arsenic removal treatment technology demonstration project at the Woodstock Middle School in Woodstock, CT. The objectives of the project were to evaluate the effectiveness of Adsorbsia™ GTO™ me...

  2. Arsenic Removal from Drinking Water by Iron Removal - U.S. EPA Demonstration Project at Northeastern Elementary School in Fountain City, IN - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at Northeastern Elementary School in Fountain City, IN. The main objective of the project was to evaluate the effectiveness of US Water Sys...

  3. Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 4

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 4 discusses the following topics: Rod Compaction/Loading System Test Results and Analysis Report; Waste Collection System Test Results and Analysis Report; Waste Container Transfer Fixture Test Results and Analysis Report; Staging and Cutting Table Test Results and Analysis Report; and Upper Cutting System Test Results and Analysis Report.

  4. ANRE demonstration project: cogeneration at anodizing company Analu, Machelen; ANRE-demonstratieproject: WKK bij anodiseringsbedrijf Analu, Machelen

    Energy Technology Data Exchange (ETDEWEB)

    Bael, J. Van; Luyckx, W.; Stroobants, J.; Daems, T.; Cools, J.

    1998-08-01

    As part of the promotion of new energy technologies the Flemish government has attached a subsidy of 35 per cent for the investment costs of a cogeneration installation in combination with an absorption refrigerating machine to the company Anala that is specialized in anodizing aluminiumprofiles for third persons. The Flemish Institute for Technological Research is doing an evaluation of this demonstration project by order of the Department Natural Resources and Energy. The energy flows were measured and registered and based on these measurements the technical performances, the achieved energy savings, the diminution of the CO2-emission and the profitability were evaluated. During the measurement period the cogeneration installation has been working for 2.785 hours, at which 398.656 liter gas oil was consumed and 1.507 MWh of electricity was produced. This corresponds with an average electric capacity of 541 kW. The average electric efficiency of the cogeneration installation is about 38 per cent and the average thermal efficiency is about 35 per cent, which takes the total efficiency up to 73 per cent. The total energy relation is for the most of the months about 0.9. The electric efficiency with full load is between 40 per cent and 41per cent. The global efficiency and the total energy relation would be higher, if the heat for the oil cooling and the intercooler would be usefully used next to the heat of the engine block cooling and the flue gas cooling, which was normally provided for the production of distilled water. The primary energy consumption of the installation is 18.778 GJ/year. The primary energy use with separate generation is 23.879 GJ/year. The savings on primary energy use are 5.101 GJ/year. The CO2-emission of the cogeneration is 1.371 ton/year for the measurement period 1997. With separate production, the CO2-emission would be 1.796 ton/year. The reduction of the CO2-emission during the measurement period is 425 ton/year, or 24 per cent compared

  5. Statistical Analysis of Bus Networks in India

    CERN Document Server

    Chatterjee, Atanu; Ramadurai, Gitakrishnan

    2015-01-01

    Through the past decade the field of network science has established itself as a common ground for the cross-fertilization of exciting inter-disciplinary studies which has motivated researchers to model almost every physical system as an interacting network consisting of nodes and links. Although public transport networks such as airline and railway networks have been extensively studied, the status of bus networks still remains in obscurity. In developing countries like India, where bus networks play an important role in day-to-day commutation, it is of significant interest to analyze its topological structure and answer some of the basic questions on its evolution, growth, robustness and resiliency. In this paper, we model the bus networks of major Indian cities as graphs in \\textit{L}-space, and evaluate their various statistical properties using concepts from network science. Our analysis reveals a wide spectrum of network topology with the common underlying feature of small-world property. We observe tha...

  6. Stress prevention in bus drivers: Evaluation of 13 natural experiments

    NARCIS (Netherlands)

    Kompier, M.A.J.; Aust, B.; Berg, A.M. van den; Siegrist, J.

    2000-01-01

    The research aim was to select, compare, and analyze interventions and preventive actions from international bus companies to decrease bus drivers' occupational stress and sickness absenteeism. Through networking, international surveys, and literature study, 13 "natural experiments" were identified

  7. The Bus Station Spacing Optimization Based on Game Theory

    Directory of Open Access Journals (Sweden)

    Changjiang Zheng

    2015-01-01

    Full Text Available With the development of city, the problem of traffic is becoming more and more serious. Developing public transportation has become the key to solving this problem in all countries. Based on the existing public transit network, how to improve the bus operation efficiency, and reduce the residents transit trip cost has become a simple and effective way to develop the public transportation. Bus stop spacing is an important factor affecting passengers’ travel time. How to set up bus stop spacing has become the key to reducing passengers’ travel time. According to comprehensive traffic survey, theoretical analysis, and summary of urban public transport characteristics, this paper analyzes the impact of bus stop spacing on passenger in-bus time cost and out-bus time cost and establishes in-bus time and out-bus time model. Finally, the paper gets the balance best station spacing by introducing the game theory.

  8. Secure Bus-Ticketing System using NFC

    Directory of Open Access Journals (Sweden)

    Monalisa Lopes

    2015-04-01

    Full Text Available For making the day to day life more convenient for the passengers travelling in bus some technologies can be used like Near Field Communication (NFC, Radio Frequency Identification (RFID. The proposed system is based on ticketing and identification of passengers in public transport. The system suggest a user friendly automated ticketing system which will automatically deduct the passengers fare according to the distance travelled as well as detect the passengers detail information. The system also helps to calculate the total revenue of a single bus in a day. Another important aspect is reusability, which helps use ticket multiple times as it is rechargeable.

  9. Bus training for developmentally disabled adults.

    Science.gov (United States)

    Robinson, D; Griffith, J; McComish, K; Swasbrook, K

    1984-07-01

    The effectiveness of a program combining classroom and community training in the teaching of bus-riding skills to developmentally disabled adults. These skills were taught sequentially using questions about a slide presentation, role playing, and performance in the natural environment. The experimental design was based upon the work of Neef, Iwata, and Page (1978). Test trials were conducted after each phase of training. Results showed that all subjects learned the necessary bus-riding skills and maintained their performance throughout the follow-up period of at least 1 year. The combination training method proved to be efficient and cost effective.

  10. Framework for Bus Rapid Transit Development and Deployment Planning

    OpenAIRE

    Miller, Mark A.; Yin, Yafeng; Balvanyos, Tunde; Ceder, Avishai

    2004-01-01

    This report presents the results of its investigation into deployment planning for bus rapid transit systems. In this study, we conducted a macro-scale examination of bus rapid transit systems from technical, operational, institutional, and planning perspectives. We then developed the theoretical foundation for a deployment planning framework for bus rapid transit systems that specifically takes into account the unique features of bus rapid transit that differ from other transit alternatives....

  11. Air quality on bus routes in Umea, Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Sandberg, H.; Forsberg, B. [Dept. of Environmental Health and Dept. of Public Health and Clinical Medicine, Umea University SE, Umea (Sweden)

    2000-07-01

    Bus traffic in some local streets with up to 650 buses per day has resulted in complaints about air pollution and suggestions from residents that the bus routes should be changed to other streets. We have studied nitrogen dioxide and benzene concentrations at five exposed sites and at two representative control sites without bus traffic, and found no general differences in air quality. However, the site and temperature adjusted concentrations fell significantly during a strike among bus drivers. (authors)

  12. Williams Holding Lease Steamflood Demonstration Project: Cat Canyon Oil Field. Third progress report, July 1978-November 1979

    Energy Technology Data Exchange (ETDEWEB)

    Ditmore, T.L.

    1980-06-01

    This report discusses pilot operations and results during this period. The performance of the displacement steam generator, the status of the sulfur dioxide scrubbing system, well workovers and the results of drilling four thermal observation wells are examined. Additional computer thermal simulation studies are discussed in detail and a new production performance projection is made. Finally, project economics and future operations are summarized.

  13. St. Louis Metro Biodiesel (B20) Transit Bus Evaluation: 12-Month Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Barnitt, R.; McCormick, R. L.; Lammert, M.

    2008-07-01

    The St. Louis Metro Bodiesel Transit Bus Evaluation project is being conducted under a Cooperative Research and Development Agreement between NREL and the National Biodiesel Board to evaluate the extended in-use performance of buses operating on B20 fuel. The objective of this research project is to compare B20 and ultra-low sulfur diesel buses in terms of fuel economy, veicles maintenance, engine performance, component wear, and lube oil performance.

  14. Bus Routes, Bus Routes, Published in 2011, 1:2400 (1in=200ft) scale, Anne Arundel County, OIT GIS.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Bus Routes dataset, published at 1:2400 (1in=200ft) scale, was produced all or in part from Field Observation information as of 2011. It is described as 'Bus...

  15. Bus Stops, This shapefile contains existing bus stops for Charlotte Area Transit System, Published in 2006, Charlotte Area Transit System.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Bus Stops dataset, was produced all or in part from Field Survey/GPS information as of 2006. It is described as 'This shapefile contains existing bus stops for...

  16. Information management advanced development. Volume 3: Digital data bus breadboard

    Science.gov (United States)

    Gerber, C. R.

    1972-01-01

    The design, development, and evaluation of the digital data bus breadboard for the modular space station are discussed. Subjects presented are: (1) requirements summary, (2) parametric data for bus design, (3) redundancy concepts, and (4) data bus breadboard performance and interface requirements.

  17. Peptic ulcer among urban bus drivers in Denmark

    DEFF Research Database (Denmark)

    Netterstrøm, Bo; Juel, K

    1990-01-01

    As part of a survey on the work environment of bus drivers, 2045 (83%) of 2465 male bus drivers in the three major cities in Denmark in 1978 answered a postal questionnaire on health and working conditions. In order to evaluate the relative occurrence of peptic ulcer among the bus drivers, a foll...

  18. Using a "small wind" demonstration project to support public extension and education in renewable energy and STEM disciplines

    Science.gov (United States)

    O'brien-gayes, P. T.

    2012-12-01

    The City of North Myrtle Beach SC has erected three small-scale wind turbines for educational purposes. These turbines are tied directly into the local power grid. This allows for a unique study opportunity through which to teach renewable energy strategies. The study focuses on inter-site variability spread out over four miles of beach. Each location is subject to different wind fields responding to local structures. The study focuses on inter-site variability to cross reference energy production with the wind and weather conditions. Public and K-12 outreach is a primary objective of the program. Using demonstration turbines and by analyzing the wind, weather and site conditions outreach efforts are focused on highlighting renewable energy concepts. This also allows focus on STEM disciplines and critical thinking in analyzing data to compare the sites and different turbine production. Engaging in the STEM disciplines the projects crosses over science, technology, engineering, and mathematical boundaries creating an interdisciplinary scientific experience for students. In addition, this allows for introduction of techniques and developing technologies. It also allows students to consider challenges and possible solutions to issues of increased power production and cost efficiency. Through connecting the touchstone of experiential learning; a hands-on experience actively engages students in experimental application and problem solving. By looking locally at renewable energy in Horry County South Carolina students are engaged in seeing how projects impact science and economic development in the region. The Congressional Research Service (CRS) Report for Congress reports a considerable need expand and enhance the o preparation of students, teachers and practitioners in the areas of science, technology, engineering and mathematics. "When compared to other nations, the math and science achievement of U.S. pupils and the rates of STEM degree attainment appear

  19. Blowers in bus systems; Einsatz von Ventilatoren in BUS-Systemen

    Energy Technology Data Exchange (ETDEWEB)

    Schneeweiss, H. [ebm - Werke GmbH und Co., Mulfingen (Germany). R und D

    2000-07-01

    Modern industrial blowers are compact and have good control characteristics. Centralized or decentralized monitoring has become a state-of-the-art technology. Bus systems make it possible to monitor and analyze component status at any time. Electronically commutated external rotor motors with bus interfaces offer a wide spectrum of applications. [German] Beim Einsatz von Ventilatoren und Geblaesen in der Industrie ist es heute Standard, dass die Geraete einen kompakten Aufbau und gute Regel- bzw. Steuereigenschaften aufweisen. Immer mehr setzt sich auch die zentrale und dezentrale Ueberwachung von Geraeten durch. Mit einem BUS-System kann der aktuelle Status jeder Komponente jederzeit abgefragt und der Zustand analysiert werden. Durch spezielle Einsatzbedingungen werden heute elektronisch kommutierte Aussenlaeufermotoren mit BUS-Schnittstellen versehen. Damit steht ein breites Anwendungsspektrum zur Verfuegung. (orig.)

  20. Repeater For A Digital-Communication Bus

    Science.gov (United States)

    Torres-Guzman, Esteban; Olson, Stephen; Heaps, Tim

    1993-01-01

    Digital repeater circuit designed to extend range of communication on MIL-STD-1553 bus beyond original maximum allowable length of 300 ft. Circuit provides two-way communication, one way at time, and conforms to specifications of MIL-STD-1553. Crosstalk and instability eliminated.

  1. Inrush-Current Limiter And Bus Isolator

    Science.gov (United States)

    Dolland, Carlisle R.

    1994-01-01

    Electronic circuit protects electrical power bus and source of power against excessive current demands. Circuit intended for use with power-consuming electronic system drawing pulsed currents and including capacitor bank as low-impedance secondary source from which pulsed currents drawn.

  2. SDRAM bus schedule of HDTV video decoder

    Science.gov (United States)

    Wang, Hui; He, Yan L.; Yu, Lu

    2001-12-01

    In this paper, a time division multiplexed task scheduling (TDM) is designed for HDTV video decoder is proposed. There are three tasks: to fetch decoded data from SDRAM for displaying (DIS), read the reference data from SDRAM for motion compensating (REF) and write the motion compensated data back to SDRAM (WB) on the bus. The proposed schedule is based on the novel 4 banks interlaced SDRAM storage structure which results in less overhead on read/write time. Two SDRAM of 64M bits (4Bank×512K×32bit) are used. Compared with two banks, the four banks storage strategy read/write data with 45% less time. Therefore the process data rates for those three tasks are reduced. TDM is developed by round robin scheduling and fixed slot allocating. There are both MB slot and task slot. As a result the conflicts on bus are avoided, and the buffer size is reduced 48% compared with the priority bus scheduling. Moreover, there is a compacted bus schedule for the worst case of stuffing owning to the reduced executing time on tasks. The size of buffer is reduced and the control logic is simplified.

  3. GEOSAF Part II. Demonstration of the operational and long-term safety of geological disposal facilities for radioactive waste. IAEA international intercomparison and harmonization project

    Energy Technology Data Exchange (ETDEWEB)

    Kumano, Yumiko; Bruno, Gerard [International Atomic Energy Agency, Vienna (Austria). Vienna International Centre; Tichauer, Michael [IRSN, Institut de Radioprotection et de Surete Nucleaire, Fontenay-aux-Roses (France); Hedberg, Bengt [Swedish Radiation Safety Authority, Stockholm (Sweden)

    2015-07-01

    International intercomparison and harmonization projects are one of the mechanisms developed by the IAEA for examining the application and use of safety standards, with a view to ensuring their effectiveness and working towards harmonization of approaches to the safety of radioactive waste management. The IAEA has organized a number of international projects on the safety of radioactive waste management; in particular on the issues related to safety demonstration for radioactive waste management facilities. In 2008, GEOSAF, Demonstration of The Operational and Long-Term Safety of Geological Disposal Facilities for Radioactive Waste, project was initiated. This project was completed in 2011 by delivering a project report focusing on the safety case for geological disposal facilities, a concept that has gained in recent years considerable prominence in the waste management area and is addressed in several international safety standards. During the course of the project, it was recognized that little work was undertaken internationally to develop a common view on the safety approach related to the operational phase of a geological disposal although long-term safety of disposal facility has been discussed for several decades. Upon completion of the first part of the GEOSAF project, it was decided to commence a follow-up project aiming at harmonizing approaches on the safety of geological disposal facilities for radioactive waste through the development of an integrated safety case covering both operational and long-term safety. The new project was named as GEOSAF Part II, which was initiated in 2012 initially as 2-year project, involving regulators and operators. GEOSAF Part II provides a forum to exchange ideas and experience on the development and review of an integrated operational and post-closure safety case for geological disposal facilities. It also aims at providing a platform for knowledge transfer. The project is of particular interest to regulatory

  4. Using Travel Diary Data to Estimate the Emissions Impacts of Transportation Strategies: The Puget Sound Telecommuting Demonstration Project.

    Science.gov (United States)

    Henderson, Dennis K; Koenig, Brett E; Mokhtarian, Patricia L

    1996-01-01

    Transportation control measures are often implemented for their environmental benefits, but there is a need to quantify what benefits actually occur. Telecommuting has the potential to reduce the number of daily trips and miles traveled with personal vehicles and, consequently, the overall emissions resulting from vehicle activity. This search studies the emissions impacts of telecommuting for the participants of the Puget Sound Telecommuting Demonstration Project (PSTDP). The California Air Resources Board's emissions models, EMFAC7F and BURDEN7F, are used to estimate the emissions on telecommuting days and non-telecommuting days, based on travel diaries completed by program participants. This study, among the first of its kind, represents the most sophisticated application of emissions models to travel diary data. Analysis of the travel diary data and the emissions model output supports the hypothesis that telecommuting has beneficial transportation and air quality impacts. The most important results are that telecommuting decreases the number of daily trips (by 30%), the vehicle-miles traveled (VMT) (by 63%), and the number of cold starts (by 44%), especially those taking place in early morning. These reductions are shown to have a large effect on daily emissions, with a 50% to 60% decrease in pollutants generated by a telecommuter's personal vehicle use on a telecommuting day. These net savings are almost entirely due to the elimination of commute trips, as non-commute trips increased by 0.33 trips per person-day (9% of the total trips), and the non-commute VMT increased by 2.2 miles. Overall reduc- tions in travel and emissions of this magnitude are observed because the telecommuters in this sample are long-distance commuters, with commutes twice as long as the regional average. However, even as telecommuting adoption moves into the mainstream, its net impacts are still expected to be beneficial- a reduction in VMT and in emissions. It is important to note

  5. Uncertainty in Bus Arrival Time Predictions: Treating Heteroscedasticity With a Metamodel Approach

    DEFF Research Database (Denmark)

    O'Sullivan, Aidan; Pereira, Francisco Camara; Zhao, Jinhua

    2016-01-01

    Arrival time predictions for the next available bus or train are a key component of modern traveler information systems (TISs). A great deal of research has been conducted within the intelligent transportation system community in developing an assortment of different algorithms that seek...... of heteroscedasticity in the predictions is demonstrated and then a metamodel approach is deployed, which augments existing predictive systems using quantile regression to place bounds on the associated error. As a case study, this approach is applied to data from a real-world TIS in Boston. This method allows bounds...... to increase the accuracy of these predictions. However, the inherent stochastic and nonlinear nature of these systems, particularly in the case of bus transport, means that these predictions suffer from variable sources of error, stemming from variations in weather conditions, bus bunching, and numerous other...

  6. STOCHASTIC BUS DISPATCHING MODEL UNTUK OPTIMALISASI JUMLAH BUS TRANSJAKARTA KORIDOR 3

    Directory of Open Access Journals (Sweden)

    Zahedi

    2011-11-01

    Full Text Available The increasing number of road user causing traffic jam finds out a way, busway. However, in its implementation, the number of fleet available does not enough to take the passengers. It results in the an amassed of passengers at several bus stops. This leads to passenger dissatisfaction satisfaction which eventually causes Transjakarta users to reuse private cars. Definitely this situation may builds up traffic jams. Stochastic Bus Dispatching Model is used to simulate public transportation that operates regularly.

  7. Bus 54 -- Where are you? A school bus intelligent information system

    Energy Technology Data Exchange (ETDEWEB)

    Truett, L.F.; Moore, S.; Tonn, B. [Oak Ridge National Lab., TN (United States); Conley, T. [GTE Wireless, Nashville, TN (United States)

    1998-07-01

    Although major accidents involving school buses are rare (only about 0.3% of all fatal crashes since 1986 are classified as school-bus-related), even minor accidents and breakdowns cause a great deal of parental anxiety. The objective of this research is to design an efficient, cost-effective, accurate, and secure system that will track individual school buses and communicate appropriate information to the school system`s central administration unit, to the school transportation administrator, and to parents of children on the bus. The greatest benefit of the proposed information system is that parents and officials can always know the location and condition (these conditions would vary depending on the needs of a particular school system) of the school buses. In case of an accident or mechanical problem, when emergency crews are needed, they can be dispatched almost immediately with a good understanding of the problem and the exact location of the bus. In addition to being able to track the bus while the child is on board, parents will be able to determine the location of their child`s bus prior to its arrival in the morning in order to prevent the child from needing to wait outside in inclement weather. The information available to parents can also be expanded to include maps of limited routes (e.g., snow routes). Basically, the Bus 54 concept consists of a bus component and a central data processing unit. Each bus will be outfitted with a global positioning satellite (GPS) device, a wireless communication device, and wireless data communication service. The central data processing unit will receive and process information from the buses and provide information access to parents and officials via an Internet link.

  8. Highly efficient optical filter based on vertically coupled photonic crystal cavity and bus waveguide

    Science.gov (United States)

    Debnath, Kapil; Welna, Karl; Ferrera, Marcello; Deasy, Kieran; Lidzey, David G.; O'Faolain, Liam

    2013-01-01

    We experimentally demonstrate a new optical filter design based on a vertically coupled photonic crystal cavity and a bus waveguide monolithically integrated on the silicon on insulator platform. The use of a vertically coupled waveguide gives flexibility in the choice of the waveguide material and dimensions, dramatically lowering the insertion loss while achieving very high coupling efficiencies to wavelength scale resonators

  9. Highly efficient optical filter based on vertically coupled Photonic crystal cavity and bus waveguide

    CERN Document Server

    Debnath, Kapil; Ferrera, Marcello; Deasy, Kieran; Lidzey, David G; O'Faolain, Liam

    2012-01-01

    We experimentally demonstrate a new optical filter design based on a vertically coupled photonic crystal cavity and a bus waveguide monolithically integrated on the silicon on insulator platform. The use of a vertically coupled waveguide gives flexibility in the choice of the waveguide material and dimensions, dramatically lowering the insertion loss while achieving very high coupling efficiencies to wavelength scale resonators

  10. Bus accident severity and passenger injury: evidence from Denmark

    DEFF Research Database (Denmark)

    Prato, Carlo Giacomo; Kaplan, Sigal

    2014-01-01

    examining occurrence of injury to bus passengers. Results Bus accident severity is positively related to (i) the involvement of vulnerable road users, (ii) high speed limits, (iii) night hours, (iv) elderly drivers of the third party involved, and (v) bus drivers and other drivers crossing in yellow or red...... principle of sustainable transit and advance the vision “every accident is one too many”. Methods Bus accident data were retrieved from the national accident database for the period 2002–2011. A generalized ordered logit model allows analyzing bus accident severity and a logistic regression enables...

  11. Heat Transfer in the LHC Main Superconducting Bus Bars

    CERN Document Server

    Granieri, P P; Richter, D

    2011-01-01

    CERN is performing a systematic analysis of the interconnecting bus bars of the Large Hadron Collider (LHC) main magnets. Their thermal, electrical, mechanical and hydraulic performances are addressed. In the frame of these studies, the heat transfer between the main superconducting (SC) bus bars and the surrounding He bath is investigated. It represents a key parameter in the comprehension of the bus bars stability and quench propagation mechanisms, thus crucial for the analysis of the 2008 incident which was triggered by a defective bus bars joint. This paper reports on the experimental tests and relative analysis aiming at describing the thermal behavior of the LHC main bus bars.

  12. Demonstration and Validation of Controlled Low-Strength Materials for Corrosion Mitigation of Buried Steel Pipes: Final Report on Project F09-A17

    Science.gov (United States)

    2015-12-01

    Materials for Corrosion Mitigation of Buried Steel Pipes Final Report on Project F09-AR17 Co ns tr uc tio n En gi ne er in g R es ea rc h La bo ra to ry...of Buried Steel Pipes Final Report on Project F09-AR17 Scott M. Lux and Charles P. Marsh Construction Engineering Research Laboratory US Army...passivation of buried steel surfaces to inhibit corrosion processes. This project was an experi- mental demonstration that tested the corrosion

  13. Integer programming model for optimizing bus timetable using genetic algorithm

    Science.gov (United States)

    Wihartiko, F. D.; Buono, A.; Silalahi, B. P.

    2017-01-01

    Bus timetable gave an information for passengers to ensure the availability of bus services. Timetable optimal condition happened when bus trips frequency could adapt and suit with passenger demand. In the peak time, the number of bus trips would be larger than the off-peak time. If the number of bus trips were more frequent than the optimal condition, it would make a high operating cost for bus operator. Conversely, if the number of trip was less than optimal condition, it would make a bad quality service for passengers. In this paper, the bus timetabling problem would be solved by integer programming model with modified genetic algorithm. Modification was placed in the chromosomes design, initial population recovery technique, chromosomes reconstruction and chromosomes extermination on specific generation. The result of this model gave the optimal solution with accuracy 99.1%.

  14. North-South Corridor Demonstration Project: Ethical and Logistical Challenges in the Design of a Demonstration Study of Early Antiretroviral Treatment for Long Distance Truck Drivers along a Transport Corridor through South Africa, Zimbabwe, and Zambia

    Directory of Open Access Journals (Sweden)

    G. B. Gomez

    2013-01-01

    Full Text Available Background. Long-distance truck drivers are at risk of acquiring and transmitting HIV and have suboptimal access to care. New HIV prevention strategies using antiretroviral drugs to reduce transmission risk (early antiretroviral therapy (ART at CD4 count >350 cells/μL have shown efficacy in clinical trials. Demonstration projects are needed to evaluate “real world” programme effectiveness. We present the protocol for a demonstration study to evaluate the feasibility, acceptability, and cost of an early ART intervention for HIV-positive truck drivers along a transport corridor across South Africa, Zimbabwe, and Zambia, as part of an enhanced strategy to improve treatment adherence and retention in care. Methods and Analysis. This demonstration study would follow an observational cohort of truck drivers receiving early treatment. Our mixed methods approach includes quantitative, qualitative, and economic analyses. Key ethical and logistical issues are discussed (i.e., choice of drug regimen, recruitment of participants, and monitoring of adherence, behavioural changes, and adverse events. Conclusion. Questions specific to the design of tailored early ART programmes are amenable to operational research approaches but present substantial ethical and logistical challenges. Addressing these in demonstration projects can inform policy decisions regarding strategies to reduce health inequalities in access to HIV prevention and treatment programmes.

  15. Certified organic farming research and demonstration project by Oklahoma State University and USDA's Agricultural Research Service at Lane, Oklahoma

    Science.gov (United States)

    In 2003, Oklahoma State University and USDA, Agricultural Research Service, South Central Agricultural Research Laboratory received organic certification for 8 acres at the Lane Agricultural Center, Lane, OK. The certified organic land was used to develop a cooperative project with a diversity of a...

  16. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Quarterly report for the period of February, March and April 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States). Progress Center

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  17. The MAJORANA DEMONSTRATOR: An R&D project towards a tonne-scale germanium neutrinoless double-beta decay search

    Energy Technology Data Exchange (ETDEWEB)

    Aalseth, Craig E; Amman, M; Amsbaugh, John F; Avignone, F. T.; Back, Henning O; Barabash, A; Barbeau, Phil; Beene, Jim; Bergevin, M; Bertrand, F; Boswell, M; Brudanin, V; Bugg, William; Burritt, Tom H; Chan, Yuen-Dat; Collar, J I; Cooper, R J; Creswick, R; Detwiler, Jason A; Doe, P J; Efremenko, Yuri; Egorov, Viatcheslav; Ejiri, H; Elliott, Steven R; Ely, James H; Esterline, James H; Farach, H A; Fast, James E; Fields, N; Finnerty, P; Fujikawa, Brian; Fuller, Erin S; Gehman, Victor; Giovanetti, G K; Guiseppe, Vincente; Gusey, K; Hallin, A L; Hazama, R; Henning, Reyco; Hime, Andrew; Hoppe, Eric W; Hossbach, Todd W; Howe, M A; Johnson, R A; Keeter, K; Keillor, Martin E; Keller, C; Kephart, Jeremy D; Kidd, Mary; Kochetov, Oleg; Konovalov, S; Kouzes, Richard T; Lesko, Kevin; Leviner, L; Loach, J C; Luke, P; MacMullin, S; Marino, Michael G; Mei, Dong-Ming; Miley, Harry S; Miller, M; Mizouni, Leila K; Montoya, A; Myers, A W; Nomachi, Masaharu; Odom, Brian; Orrell, John L; Phillips, D; Poon, Alan; Prior, Gersende; Qian, J; Radford, D C; Rielage, Keith; Robertson, R G. H.; Rodriguez, Larry; Rykaczewski, Krzysztof P; Schubert, Alexis G; Shima, T; Shirchenko, M; Strain, J; Thomas, K; Thompson, Robert C; Timkin, V; Tornow, W; Van Wechel, T D; Vanyushin, I; Vetter, Kai; Warner, Ray A; Wilkerson, J; Wouters, Jan; Yakushev, E; Young, A; Yu, Chang-Hong; Yumatov, Vladimir; Zhang, C L; Zimmerman, S

    2009-12-17

    The MAJORANA collaboration is pursuing the development of the so-called MAJORANA DEMONSTRATOR. The DEMONSTRATOR is intended to perform research and development towards a tonne-scale germanium-based experiment to search for the neutrinoless double-beta decay of 76Ge. The DEMONSTRATOR can also perform a competitive direct dark matter search for light WIMPs in the 1-10GeV/c2 mass range. It will consist of approximately 60 kg. of germanium detectors in an ultra-low background shield located deep underground at the Sanford Underground Laboratory in Lead, SD. The DEMONSTRATOR will also perform background and technology studies, and half of the detector mass will be enriched germanium. This talk will review the motivation, design, technology and status of the Demonstrator.

  18. Design and Analysis of Bus Front Panel Usin G FRP

    Directory of Open Access Journals (Sweden)

    G. Adinarayana

    2014-10-01

    Full Text Available Recently, Advance composite materials have taken the significant share with other engineering materials due to its mechanical properties and high strength to weight ratio. Advance composite like E-glass, S-glass, Carbon fiber, Kevlar are not yet confined at the aerospace industry but gradually these are taking over the position of other industries as well. Because of its attaining high intricacy in designing factors and as well as cheaper mould design and also less cost in production of few numbers. The applications of FRPs are spirally increasing. The aim of this project is to develop a BUS FRONT PANEL with a help of FRPs in order to sustain all the mechanical properties which are equivalent to the metals with the help of advanced computer aided software designs like ANSYS. In computer aided engineering to make the product proven in the realistic market.

  19. A Program to Train Apprentices to Lead Inservice Workshops for Secondary Teachers of Basic Skills. Developer/Demonstration Project. Final Report.

    Science.gov (United States)

    Stallings, Jane A.

    The Development and Demonstration project has trained interns to lead Effective Use of Time inservice workshops for secondary school teachers of basic reading and mathematical skills. These interns then returned to their home bases and trained teachers who could in turn train other teachers to use the Stallings Effective Use of Time methods. The…

  20. Arsenic and Uranium Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Upper Bodfish in Lake Isabella, CA -Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the performance evaluation of an arsenic (As) and uranium (U) removal technology demonstrated at Upper Bodfish in Lake Isabella, CA. The objectives of the project are to evaluate: (1) the effecti...