WorldWideScience

Sample records for building roof-seal replacement

  1. build - A Directory Savvy Replacement for Make

    Energy Technology Data Exchange (ETDEWEB)

    Reus, J F

    2005-01-10

    All but the most trivial software packages are generally constructed from multiple source files with many steps being required to generate lexer and parser source files, compile the numerous source files, assemble libraries from object files, and link object files and libraries to form the binary executable application. During the development process, the construction process may be repeated many times as source code is modified requiring the application to be rebuilt. To address this problem the original make tool was developed. However this tool was developed when applications were rather simple with a limited number of source files in single directories. Few header files outside of the standard system header files were used. The graph formed by the file-to-file dependencies was generally simple with little cross branching and limited depth. The increased complexity of modern software systems has made the traditional make tool less capable of managing the problem. Good software development practices have led to more and more source files arranged in directory hierarchies. Modular development of the software has resulted in the proliferation of developer implemented header files and libraries that are part of the application. Code reuse and object oriented design has made the problem even worse by hiding the necessity to recompile source files. In short, the dependency graph has become much more complex, less a tree and more lattice-like. Keeping track of these dependencies rapidly becomes difficult with the increasing complexity of the software. In addition the shear volume of source code has increased the need to avoid unnecessary compiles or relinks. The increased number of source files to be compiled has also increased the opportunity for parallelism but the increased complexity of the directory hierarchy and file-file dependencies has at the same time made it harder to exploit parallelism. This paper gives a brief introduction to build - an improved

  2. Building America Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  3. Technology Solutions Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency, which faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68°F) than day (73° F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  4. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, J.; Henderson, H.; Varshney, K.

    2014-09-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  5. Assessing regional differences in lighting heat replacement effects in residential buildings across the United States

    International Nuclear Information System (INIS)

    Highlights: • Replacing inefficient lamps affects heating and cooling demands of a building. • We assess regional differences of this effect at 105 cities in the U.S. • The effect size depends on regional factors such as climate and fuel mix. • The effect can undermine up to 40% of originally intended primary energy savings. • The overall effect is at most 1% of total energy consumption by a house. - Abstract: Lighting accounts for 19% of total U.S. electricity consumption and 6% of carbon dioxide equivalent (CO2e) emissions. Existing technologies, such as compact fluorescent lamps and light emitting diodes, can substitute low-efficiency technologies such as incandescent lamps, while saving energy and reducing energy bills to consumers. For that reason, lighting efficiency goals have been emphasized in U.S. energy efficiency policies. However, incandescent bulbs release up to 95% of input energy as heat, impacting the overall building energy consumption: replacing them increases demands for heating service that needs to be provided by the heating systems and decreases demands for cooling service that needs to be provided by the cooling systems. This work investigates the net energy consumption, CO2e emissions, and savings in energy bills for single-family detached houses across the U.S. as one adopts more efficient lighting systems. In some regions, these heating and cooling effects from more efficient lighting can undermine up to 40% of originally intended primary energy savings, erode anticipated carbon savings completely, or lead to 30% less household monetary savings than intended. The size of the effect depends on regional factors such as climate, technologies used for heating and cooling, electricity fuel mix, emissions factors, and electricity prices. However, we also find that for moderate lighting efficiency interventions, the overall effect is small in magnitude, corresponding at most to 1% of either total emissions or of energy consumption by a

  6. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, J.; Henderson, H.; Varshney, K.

    2013-10-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. of Cambridge, Massachusetts, to implement and study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating control systems in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded.

  7. CEO- CNE Relationships: Building an Evidence-Base of Chief Nursing Executive Replacement Costs

    Directory of Open Access Journals (Sweden)

    Darlene Sredl, Niang-Huei Peng

    2010-01-01

    Full Text Available OBJECTIVE: Explore professional relationships between Chief Nurse Executives (CNEs and Chief Executive Officers (CEOs; CNE ethnic diversity; and CNE replacement costs. BACKGROUND: Theoretical frameworks - Marilyn Ray's Theory of Bureaucratic Caring, and Turkel's Theory of Relational Complexity espousing economic as well as caring variables. METHODS: Exploratory mixed-method descriptive design using CNE mailed survey. RESULTS: CNE- cited opportunities for maintaining a positive relationship with the CEO: respect for CEO; goal- sharing (r=.782, p<0.01; having a strong relationship (r= .718, p<0.01; co-problem-solving (r=.437, p<0.01; having an interesting job (r=.406, p<0.01; having similar interests with CEO (r= .346, p<0.01; CEO and CNE maintaining specific roles (r= .261, p<0.05; satisfaction with CNE income (r=.251, p<0.05; willingness to improve relationship with CEO (r=.254, p<0.05. CNE positions demonstrated an ethnic diversity factor of 0.03%. CNE replacement costs to healthcare facilities were over 1.5 million dollars. CONCLUSION: CNE/CEO relationships have identified cohesive factors that may contribute to CNE longevity in position; an ethically diverse CNE deficit exists; and, CNE turnover and vacancy rates impact an organization's financial health and quality of care.

  8. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings - Phase 1: Boiler Control Replacement and Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, J.; Henderson, H.

    2012-04-01

    The ARIES Collaborative, a Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, MA to implement and study improvements to the heating system in one of the non-profit's housing developments. The heating control systems in the 42-unit Columbia CAST housing development were upgraded in an effort projected to reduce heating costs by 15 to 25 percent.

  9. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated.

  10. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE's Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated

  11. Building

    OpenAIRE

    Seavy, Ryan

    2014-01-01

    Building for concrete is temporary. The building of wood and steel stands against the concrete to give form and then gives way, leaving a trace of its existence behind. Concrete is not a building material. One does not build with concrete. One builds for concrete.

  12. Funding renal replacement therapy in southeast Asia: building public-private partnerships in Singapore, Malaysia, Thailand, and Indonesia.

    Science.gov (United States)

    Morad, Zaki; Choong, Hui Lin; Tungsanga, Kriang; Suhardjono

    2015-05-01

    The provision of renal replacement therapy (RRT) in developing economies is limited by lack of financial and other resources. There are no national reimbursement policies for RRT in many countries in Asia. The Southeast Asia countries of Singapore, Malaysia, Thailand, and Indonesia have adopted a strategy of encouraging public-private partnerships to increase the RRT rates in their respective countries. The private organizations include both for-profit and philanthropic bodies. The latter raise funds from ordinary citizens, corporations, and faith-based groups, as well as receive subsidies from the government to support RRT for patients in need. The kidney foundations of these countries play a leadership role in this public-private partnership. Many of the private organizations that support RRT are providers of treatment in addition to offering financial assistance to patients, with hemodialysis being the most frequently supported modality. Public-private partnership in funding RRT is sustainable over the long term with proper organization and facilitated by support from the government. PMID:25736214

  13. Replacement of the feedwater pipe system in reactor building outside containment at the nuclear power plant Philippsburg; Austausch der Speisewasserleitung im Reaktorgebaeude ausserhalb SHB im Kernkraftwerk Philippsburg I

    Energy Technology Data Exchange (ETDEWEB)

    Kessler, A. [Energie-Versorgung Schwaben AG, Stuttgart (Germany); Labes, M. [Siemens AG Unternehmensbereich KWU, Offenbach am Main (Germany); Schwenk, B. [Kernkraftwerk Philippsburg GmbH (Germany)

    1998-11-01

    After full replacement of the feedwater pipe system during the inspection period in 1997, combined with a modern materials, manufacturing and analysis concept, the entire pipe system of the water/steam cycle in the reactor building of KKP 1 now consists of high-toughness materials. The safety level of the entire plant has been increased by leaving aside postulation of F2 breaks in the reactor building and providing for protection against 0.1 leaks. Based on fluid-dynamic calculations for the cases of pump failure and pipe break, as well as pipe system calculations in 5 extensive calculation cycles, about 130 documents were filed for inspection and approval (excluding preliminary test documents on restraints). Points of main interest for safety analysis in this context were the optimised closing performance of the 3rd check valves and the integrity of the nozzle region at the RPV. (oirg./CB) [Deutsch] Durch den Restaustausch der Speisewasserleitungen in der Revision 1997, verbunden mit einem modernen Werkstoff-, Fertigungs- und Nachweiskonzept, sind im Reaktorgebaeude von KKP 1 in den Hauptleitungen des Wasser-Dampf-Kreislaufes nur noch hochzaehe Werkstoffe eingesetzt. Durch den Verzicht auf das Postulat von 2F-Bruechen im Reaktorgebaeude und durch die Auslegung gegen 0,1F-Lecks wird das Sicherheitsniveau der Anlage insgesamt gesteigert. Ausgehend von fluiddynamischen Berechnungen fuer Pumpenausfall und Rohrbruch sowie Rohrsystem-Berechnungen in 5 umfangreichen Berechnungskreisen wurden fuer die Genehmigung und Begutachtung ca. 130 Unterlagen (ohne Halterungs-Vorpruefunterlagen) eingereicht und vom Gutachter geprueft. Schwerpunkte der Nachweisfuehrung waren die Optimierung des Schliessverhaltens der 3. Rueckschlagarmaturen sowie der Integritaetsnachweis des RDB-Anschlusses. (orig./MM)

  14. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed reactor system at Building 9212. Draft environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is Iocated within the Y-12 Plant on DOE`s Oak Ridge Reservation in Oak Ridge, Tennessee. The current AHF supply and fluidized-bed reactor systems were designed and constructed more than 40 years ago. Because of their deteriorating condition, the corrosive nature of the materials processed, and the antiquated design philosophy upon which they are based, their long-term reliability cannot be assured. The current AHF supply system cannot mitigate an accidental release of AHF and vents fugitive AHF directly to the atmosphere during operations. the proposed action would reduce the risk of exposing the Y-12 Plant work force, the public, and the environment to an accidental release of AHF and would ensure the continuing ability of the Y-12 Plant to manufacture highly enriched uranium metal and process uranium from retired weapons for storage.

  15. Hip Replacement

    Science.gov (United States)

    Hip replacement is surgery for people with severe hip damage. The most common cause of damage is ... therapy, pain medicines, and exercise haven't helped, hip replacement surgery might be an option for you. ...

  16. Directed Replacement

    CERN Document Server

    Karttunen, L

    1996-01-01

    This paper introduces to the finite-state calculus a family of directed replace operators. In contrast to the simple replace expression, UPPER -> LOWER, defined in Karttunen (ACL-95), the new directed version, UPPER @-> LOWER, yields an unambiguous transducer if the lower language consists of a single string. It transduces the input string from left to right, making only the longest possible replacement at each point. A new type of replacement expression, UPPER @-> PREFIX ... SUFFIX, yields a transducer that inserts text around strings that are instances of UPPER. The symbol ... denotes the matching part of the input which itself remains unchanged. PREFIX and SUFFIX are regular expressions describing the insertions. Expressions of the type UPPER @-> PREFIX ... SUFFIX may be used to compose a deterministic parser for a ``local grammar'' in the sense of Gross (1989). Other useful applications of directed replacement include tokenization and filtering of text streams.

  17. Shoulder replacement - discharge

    Science.gov (United States)

    Total shoulder arthroplasty - discharge; Endoprosthetic shoulder replacement - discharge; Partial shoulder replacement - discharge; Partial shoulder arthroplasty - discharge; Replacement - shoulder - discharge; ...

  18. Joint Replacement Surgery

    Science.gov (United States)

    ... a Clinical Trial Journal Articles Arthritis July 2014 Joint Replacement Surgery: Health Information Basics for You and Your Family What Is Joint Replacement Surgery? Joint replacement surgery is removing a ...

  19. Electric efficiency in lighting system and air conditioners replacement and automation of air conditioners split type in public buildings; Eficiencia eletrica na substituicao do sistema de iluminacao e de condicionadores de ar e automacao do sistema de condicionadores de ar tipo split em predios publicos

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcellos, Arnulfo Barroso de; Apolonio, Roberto; Silva, Luciana Oliveira da; Gomes, Fernanda Leles [Universidade Federal de Mato Grosso (UFMT), MT (Brazil); Malheiro, Teresa Irene Ribeiro de Carvalho [Instituto Federal de Educacao, Ciencia e Tecnologia de Mato Grosso (IFMT), MT (Brazil); Barros, Regiane Silva de [Universidade Estadual de Campinas (UNICAMP), SP (Brazil)

    2010-07-01

    The reduction in expenditure on electricity is a major benefit not only consumers but also to utilities. In this context, this article examines the process of replacing the system of internal lighting, window type air conditioners and automation of Split type air conditioners from buildings of public institutions of the state of Mato Grosso during 2009 year and verifies the reduction in annual consumption of electric power and demand active power. Thus, measurements and calculations performed are presented for the interior lighting systems and air conditioners of these buildings before and after implementation of the process of replacing the system of internal lighting and window type air conditioners and automation of Split type air conditioners. This work is the result of integration among the Dealer Network Energy Rede Cemat, the Federal University of Mato Grosso (UFMT) and the Administration of all public buildings, where the academy answered these real issues, solving the specific problem presented. (author)

  20. Upgrade or replace?: The effect of the EPBD on the choice between improvement or replacement

    NARCIS (Netherlands)

    Thomsen, A.F.; Van der Flier, C.L.

    2010-01-01

    What is better: improvement or replacement by new construction? The choice between life cycle extension and replacement of existing buildings is at itself a vital but very difficult decision, involving a wide range of different aspects and affecting several contrary and often conflicting interests.

  1. The Replace Operator

    CERN Document Server

    Karttunen, L

    1995-01-01

    This paper introduces to the calculus of regular expressions a replace operator, ->, and defines a set of replacement expressions that concisely encode several alternate variations of the operation. The basic case is unconditional obligatory replacement: UPPER -> LOWER Conditional versions of replacement, such as, UPPER -> LOWER || LEFT _ RIGHT constrain the operation by left and right contexts. UPPER, LOWER, LEFT, and RIGHT may be regular expressions of any complexity. Replace expressions denote regular relations. The replace operator is defined in terms of other regular expression operators using techniques introduced by Ronald M. Kaplan and Martin Kay in "Regular Models of Phonological Rule Systems" (Computational Linguistics 20:3 331-378. 1994).

  2. Partial knee replacement - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100225.htm Partial knee replacement - series To use the sharing features on ... A.M. Editorial team. Related MedlinePlus Health Topics Knee Replacement A.D.A.M., Inc. is accredited ...

  3. Shoulder Joint Replacement

    Science.gov (United States)

    ... en because of implant loosening, wear, infection, and dislocation. When this occurs, a second joint replacement surgery — called a revision surgery — may be necessary. Is Shoulder Joint Replacement for You? The decision to have ...

  4. Elbow replacement - discharge

    Science.gov (United States)

    Total elbow arthroplasty - discharge; Endoprosthetic elbow replacement - discharge ... You had surgery to replace your elbow joint with artificial joint parts (prosthetics). The surgeon made a cut (incision) in the back of your upper or lower arm and ...

  5. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  6. Environmental impacts during the operational phase of residential buildings

    NARCIS (Netherlands)

    Blom, I.S.

    2010-01-01

    To date, the focus in the field of sustainable building has been on new building design. However, existing residential buildings inflict great environmental burden through three causes: continuous energy consumption, regular building maintenance and replacements. This publication analyses and compa

  7. Aggression Replacement Training and Childhood Trauma

    Science.gov (United States)

    Amendola, A. Mark; Oliver, Robert W.

    2013-01-01

    Aggression Replacement Training (ART) was developed by the late Arnold Goldstein of Syracuse University to teach positive alternatives to children and youth with emotional and behavioral problems (Glick & Gibbs, 2011; Goldstein, Glick, & Gibbs, 1998). ART provides cognitive, affective, and behavioral interventions to build competence in…

  8. Knee joint replacement

    Science.gov (United States)

    Knee joint replacement is a surgery to replace a knee joint with a man-made joint. The artificial joint is called a prosthesis . ... cartilage and bone are removed from the knee joint. Man-made pieces are then placed in the ...

  9. Replacement nuclear steam generators

    International Nuclear Information System (INIS)

    This paper reviews past and current practices in the replacement of nuclear steam generators. Plants where steam generator replacement has occurred are reviewed to see what changes have been made, and how the evolving technology has significantly reduced outage time and man-rem exposures. Current preferences in design and material are reviewed. 3 refs., 3 tabs., 2 figs

  10. Radiation Source Replacement Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  11. Hip replacement - precautions

    Science.gov (United States)

    ... Barker KL, Dewey ME, Sackley CM. Effectiveness of physiotherapy exercise following hip arthroplasty for osteoarthritis: a systematic ... to ask your doctor Hip replacement - discharge Preventing falls - what to ask your doctor Update Date 11/ ...

  12. Total Knee Replacement

    Science.gov (United States)

    ... following total knee replacement include unlimited walking, swimming, golf, driving, light hiking, biking, ballroom dancing, and other ... to the final success of your surgery. To learn more about the full value of total knee ...

  13. Hormone Replacement Therapy

    Science.gov (United States)

    ... before and during menopause, the levels of female hormones can go up and down. This can cause ... hot flashes and vaginal dryness. Some women take hormone replacement therapy (HRT), also called menopausal hormone therapy, ...

  14. Knee joint replacement - slideshow

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/presentations/100088.htm Knee joint replacement - series To use the sharing features ... 4 out of 4 Normal anatomy Overview The knee is a complex joint. It contains the distal ...

  15. The replacement research reactor

    International Nuclear Information System (INIS)

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  16. Transcatheter Pulmonary Valve Replacement

    OpenAIRE

    Ghawi, Hani; Kenny, Damien; Hijazi, Ziyad M.

    2012-01-01

    Transcatheter pulmonary valve replacement (tPVR) has evolved into a viable alternative to surgical conduit or bioprosthetic valve replacement. This procedure has paved the way for a more advanced approach to congenital and structural interventional cardiology. Although many successes have been noted, there are still a number of challenges with this procedure, including large delivery systems, the need for a conduit or a bioprosthetic valve as a landing zone for the valve, optimal timing of th...

  17. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    shed light on this unexplored and growing managerial concern, the purpose of this explorative study is to identify operational challenges to management when product platforms are replaced. Design/methodology/approach – The study uses a longitudinal field-study approach. Two companies, Gamma and Omega......Purpose – It is argued in this article that too little is known about product platforms and how to deal with them from a manager's point of view. Specifically, little information exists regarding when old established platforms are replaced by new generations in R&D and production environments. To...... distinguishing between platform replacement “height” and “width”. Seven groups of managerial measures for dealing with the issues are recommended. Originality/value – The study aims to contribute to the existing literature by taking a managers' perspective of product platform development. Its specific...

  18. Replacing a Missing Tooth

    Science.gov (United States)

    ... the extra bulk and removable nature of the partial denture and report that it feels unnatural. This type of prosthesis is best as a temporary replacement as described above. The second option in a patient without a bone graft is a fixed bridge. The missing tooth is restored with an ...

  19. The replacement research reactor

    International Nuclear Information System (INIS)

    The contract for the design, construction and commissioning of the Replacement Research Reactor was signed in July 2000. This was followed by the completion of the detailed design and an application for a construction licence was made in May 2001. This paper will describe the main elements of the design and their relation to the proposed applications of the reactor. The future stages in the project leading to full operation are also described

  20. Aortic valve replacement

    DEFF Research Database (Denmark)

    Kapetanakis, Emmanouil I; Athanasiou, Thanos; Mestres, Carlos A;

    2008-01-01

    BACKGROUND AND AIMS OF THE STUDY: Prompted by anecdotal evidence and observations by surgeons, an investigation was undertaken into the potential differences in implanted aortic valve prosthesis sizes, during aortic valve replacement (AVR) procedures, between northern and southern European countr...... southern European countries. Imbalances in the prevalence of rheumatic heart disease, health resource availability and variations in surgical practice throughout Europe might be possible etiological causes....

  1. Nanotechnology in joint replacement

    OpenAIRE

    Torrecillas, Ramón; J. S. MOYA; Díaz, L. A.; Bartolomé, J. F.; Fernández, Adolfo; Lopez-Esteban, S.

    2009-01-01

    This paper reviews the most relevant achievements and new developments in the field of nanomaterials and their possible impact on the fabrication of a new generation of reliable and longer lasting implants for joint replacement. Special emphasis is given to the role of nanocomposites with different microstructural designs: micro-nano composites, nano-nano composites, macro-micro-nano composites as well as bioinspired hierarchical composite materials. These nanostructured materials have opened...

  2. Renal Replacement Therapy

    OpenAIRE

    Zaccaria Ricci; Stefano Romagnoli; Claudio Ronco

    2016-01-01

    During the last few years, due to medical and surgical evolution, patients with increasingly severe diseases causing multiorgan dysfunction are frequently admitted to intensive care units. Therapeutic options, when organ failure occurs, are frequently nonspecific and mostly directed towards supporting vital function. In these scenarios, the kidneys are almost always involved and, therefore, renal replacement therapies have become a common routine practice in critically ill patients with acute...

  3. Renal Replacement Therapy.

    Science.gov (United States)

    Ricci, Zaccaria; Romagnoli, Stefano; Ronco, Claudio

    2016-01-01

    During the last few years, due to medical and surgical evolution, patients with increasingly severe diseases causing multiorgan dysfunction are frequently admitted to intensive care units. Therapeutic options, when organ failure occurs, are frequently nonspecific and mostly directed towards supporting vital function. In these scenarios, the kidneys are almost always involved and, therefore, renal replacement therapies have become a common routine practice in critically ill patients with acute kidney injury. Recent technological improvement has led to the production of safe, versatile and efficient dialysis machines. In addition, emerging evidence may allow better individualization of treatment with tailored prescription depending on the patients' clinical picture (e.g. sepsis, fluid overload, pediatric). The aim of the present review is to give a general overview of current practice in renal replacement therapies for critically ill patients. The main clinical aspects, including dose prescription, modality of dialysis delivery, anticoagulation strategies and timing will be addressed. In addition, some technical issues on physical principles governing blood purification, filters characteristics, and vascular access, will be covered. Finally, a section on current standard nomenclature of renal replacement therapy is devoted to clarify the "Tower of Babel" of critical care nephrology. PMID:26918174

  4. ESOPHAGEAL REPLACEMENT IN CHILDREN

    Directory of Open Access Journals (Sweden)

    G. Giannotti

    2012-01-01

    Full Text Available Introduction: esophageal replacement in childhood, is indicated for intractable stenosis and long-gap atresia. When it is impossible to preserve the native esophagus we must create an appropriate conduit that should allow physiological oral feeding. Patients and Methods: we present two cases. The first patient, born with long gap esophageal atresia (AE, was submitted to ligation of fistula, gastrostomy and esophagostomy. When he was 1 years old came to our observation with two derivations. The radiological examination with contrast confirmed the large gap between the two oesophageal stumps. We decided to refer the patient to esophageal substitution with isoperistaltic jejunum through the posterior mediastinum. The second patient was born with AE type III and he was submitted to ligation of fistula, primary anastomosis, and 4 additional interventions of closure of recurrent fistula, esophageal resection and anti-reflux surgery. He came to our observation when he was 6 years old. The radiography showed esophageal dysmotility and dislocation of the stomach in the chest. We decided to subject the patient to esophageal replacement with stomach in toto. Results: Both patients had a good post-operative course. They began food orally in the first case in 18th day and in the second case in 7th. At follow-up after 1 year the children ate regularly, they don’t show respiratory symptoms or gastro-oesophageal reflux and they have a good growth. Conclusions: Esophageal replacement is a complex surgical procedure, which provides various options. Only a careful preoperative evaluation allows us a choice of organ to be used as esophageal substitute. The colon is the most widely used. There are other surgical options that may offer, in skilled hands, the same guarantees. Both our cases have a good long term follow-up with regular diet and weight-height growth. Our experience confirms the validity of the 2 techniques, which include preferably the use of

  5. Immediate total tooth replacement.

    Science.gov (United States)

    Garber, D A; Salama, M A; Salama, H

    2001-03-01

    Successful implant placement at the time of extraction has been documented. Implant placement at the time of extraction was initially performed as a two-stage procedure often with barrier membranes and sophisticated second-stage surgical uncoverings. The authors describe the next generation of this technique, including atraumatic tooth removal with simultaneous root form, implant placement, and temporization at one appointment. This technique of "Immediate Total Tooth Replacement" allows for the maintenance of the bony housing and soft-tissue form that existed before extraction, while at the same time establishing a root form anchor in the bone for an esthetic restoration. PMID:11913258

  6. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    HR/SOC

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. The old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015), in order to fill in a 'fiche individuelle' form, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format. The French card in their possession. An A4 photocopy of the same French card, certified by the cards office as being a true copy. Those members of the personnel whose cards (and/or cards belonging to members of their families) are shortly due to expire, or have recently done...

  7. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division; Cards.Service@cern.ch

    2001-01-01

    The French Ministry of Foreign Affairs is currently replacing all diplomatic cards, special cards and employment permits («attestations de fonctions») held by members of the personnel and their families. These cards are replaced by secure, computerized equivalents. The old cards may no longer be used after 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015) between 8h30 and 12h30, in order to fill in a «fiche individuelle» form, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format, the French card in their possession, an A4 photocopy of the same French card, certified by the cards office as being a true copy. Those members of the personnel whose cards (and/or cards belonging to members of their families) are shortly due to expire, or have recently done so, are also requested...

  8. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. The old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel are asked to go to the cards office (33/1-015), taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format, The French card in their possession, an A4 photocopy of the same French card, certified by the cards office as being a true copy. Those members of the personnel whose cards (and/or cards belonging to members of their families) are shortly due to expire, or have recently done so, are also requested to take these items to the c...

  9. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. A 'personnel office' stamped photocopy of the old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015), between 8:30 and 12:30, in order to fill a 'fiche individuelle' form (in black ink only), which has to be personally signed by themselves and another separately signed by members of their family, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format (signed on the back) The French card in their possession an A4 photocopy of the same Fre...

  10. Total disc replacement.

    Science.gov (United States)

    Vital, J-M; Boissière, L

    2014-02-01

    Total disc replacement (TDR) (partial disc replacement will not be described) has been used in the lumbar spine since the 1980s, and more recently in the cervical spine. Although the biomechanical concepts are the same and both are inserted through an anterior approach, lumbar TDR is conventionally indicated for chronic low back pain, whereas cervical TDR is used for soft discal hernia resulting in cervicobrachial neuralgia. The insertion technique must be rigorous, with precise centering in the disc space, taking account of vascular anatomy, which is more complex in the lumbar region, particularly proximally to L5-S1. All of the numerous studies, including prospective randomized comparative trials, have demonstrated non-inferiority to fusion, or even short-term superiority regarding speed of improvement. The main implant-related complication is bridging heterotopic ossification with resulting loss of range of motion and increased rates of adjacent segment degeneration, although with an incidence lower than after arthrodesis. A sufficiently long follow-up, which has not yet been reached, will be necessary to establish definitively an advantage for TDR, particularly in the cervical spine. PMID:24412045

  11. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  12. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  13. The Optimum Replacement of Weapon

    Institute of Scientific and Technical Information of China (English)

    ZHANG Xiao; ZHANG Jin-chun

    2002-01-01

    The theory of LCC (Life Cycle Cost) is applied in this paper. The relation between the economic life of weapon and the optimum replacement is analyzed. The method to define the optimum replacement time of weapon is discussed.

  14. When to Replace a Prosthesis

    Science.gov (United States)

    ... to Replace a Prosthesis When to Replace a Prosthesis Web Development April 21, 2015 Fact Sheet Last ... workplace, they must be accurately fit with a prosthesis that matches their own anatomy; one that is ...

  15. Total ankle joint replacement.

    Science.gov (United States)

    2016-02-01

    Ankle arthritis results in a stiff and painful ankle and can be a major cause of disability. For people with end-stage ankle arthritis, arthrodesis (ankle fusion) is effective at reducing pain in the shorter term, but results in a fixed joint, and over time the loss of mobility places stress on other joints in the foot that may lead to arthritis, pain and dysfunction. Another option is to perform a total ankle joint replacement, with the aim of giving the patient a mobile and pain-free ankle. In this article we review the efficacy of this procedure, including how it compares to ankle arthrodesis, and consider the indications and complications. PMID:26868932

  16. Iron replacement therapy

    DEFF Research Database (Denmark)

    Nielsen, Ole Haagen; Coskun, Mehmet; Weiss, Günter

    2016-01-01

    PURPOSE OF REVIEW: Approximately, one-third of the world's population suffers from anemia, and at least half of these cases are because of iron deficiency. With the introduction of new intravenous iron preparations over the last decade, uncertainty has arisen when these compounds should be...... administered and under which circumstances oral therapy is still an appropriate and effective treatment. RECENT FINDINGS: Numerous guidelines are available, but none go into detail about therapeutic start and end points or how iron-deficiency anemia should be best treated depending on the underlying cause of...... iron deficiency or in regard to concomitant underlying or additional diseases. SUMMARY: The study points to major issues to be considered in revisions of future guidelines for the true optimal iron replacement therapy, including how to assess the need for treatment, when to start and when to stop...

  17. Maintenance and replacement of windows; Ikkunoiden kunnossapito ja uusiminen

    Energy Technology Data Exchange (ETDEWEB)

    Kivimaeki, J.; Immonen, K. [Renova-tieto, Helsinki (Finland)

    1993-05-01

    `Maintenance and Replacement of Windows` is the final report for the study `Energy Efficient Repair of Windows` belonging to the ETRR Research Programme on Energy Efficient Buildings and Building Components. The research programme is financed by The Energy Department of The Ministry of Trade and Industry in Finland. The objective of the study was the repair and replacement techniques of windows, their effect on heat losses in residential buildings, different glazing and window types, the characteristics of windows, as well as testing these characteristics. Other objectives were the use potential of new window technology in building renovation, repair costs, and the life-cycle costs of window repairs. The report gives advice on maintenance inspection of windows, choosing the right repair techniques, as well as signing and supervising window repair contracts. The information is based on practical experience achieved from building sites. The report is intended for experts, designers, house owners, and other people involved with window repairs and maintenance. Reducing the heat losses of windows is sensible even with current energy prices. Reducing the energy losses through windows is one the best energy saving measures, both for individual buildings and the whole building stock. When repairing windows, too little attention is often paid to energy efficiency, because the maximum U value permissible for windows according to the National Building Code of Finland is rather high compared with the U values for walls, which are 0.2 - 0.3 W/m{sup 2}K.

  18. Maintenance and replacement of windows. Ikkunoiden kunnossapito ja uusiminen

    Energy Technology Data Exchange (ETDEWEB)

    Kivimaeki, J.; Immonen, K. (Renova-tieto, Helsinki (Finland))

    1993-01-01

    'Maintenance and Replacement of Windows' is the final report for the study 'Energy Efficient Repair of Windows' belonging to the ETRR Research Programme on Energy Efficient Buildings and Building Components. The research programme is financed by The Energy Department of The Ministry of Trade and Industry in Finland. The objective of the study was the repair and replacement techniques of windows, their effect on heat losses in residential buildings, different glazing and window types, the characteristics of windows, as well as testing these characteristics. Other objectives were the use potential of new window technology in building renovation, repair costs, and the life-cycle costs of window repairs. The report gives advice on maintenance inspection of windows, choosing the right repair techniques, as well as signing and supervising window repair contracts. The information is based on practical experience achieved from building sites. The report is intended for experts, designers, house owners, and other people involved with window repairs and maintenance. Reducing the heat losses of windows is sensible even with current energy prices. Reducing the energy losses through windows is one the best energy saving measures, both for individual buildings and the whole building stock. When repairing windows, too little attention is often paid to energy efficiency, because the maximum U value permissible for windows according to the National Building Code of Finland is rather high compared with the U values for walls, which are 0.2 - 0.3 W/m[sup 2]K.

  19. Using your shoulder after replacement surgery

    Science.gov (United States)

    Joint replacement surgery - using your shoulder; Shoulder replacement surgery - after ... You have had shoulder replacement surgery to replace the bones of your shoulder joint with artificial parts. The parts include a stem made ...

  20. “以证代考,考教分离”教学改革模式探究--以高职“建筑测量”为例%Exploration on Teaching Reform Mode of"Exam Replaced by the Certificates and Isolation of Teaching and Learning"--Taking Building Surveying as an Example

    Institute of Scientific and Technical Information of China (English)

    张重英; 郭军

    2016-01-01

    Building Surveying is one of core curriculums in civil engineering major. Since "exam replaced by the certificates and isolation of teaching and learning" carried out, it has increased students employment rate and has improved theirs' practical ability and professional quality. Schools, students and construction of enterprises reached tripartite win-win situation, got more job opportunities and improved students' competitiveness.%高职"建筑测量"是土木工程专业的一门核心课程,"以证代考,考教分离"教学改革模式实施以来,增强了学生就业率,全面提升了学生的实践动手和职业素质能力,达到了学校、学生和施工企业三方互赢的局面,提高了学生的岗位竞争力和职业适应力。

  1. Anterior Approach Total Hip Replacement

    Medline Plus

    Full Text Available ... and E-poly antioxidant-infused technology during a hip replacement through the anterior supine intramuscular approach. “OR- ... Dr. Keith Berend perform an anterior approach total hip replacement with the patient on a regular OR ...

  2. Safety benefits from CANDU reactor replacement. A case study

    International Nuclear Information System (INIS)

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  3. Safety benefits from CANDU reactor replacement - a case study

    International Nuclear Information System (INIS)

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  4. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... a significant number of mitral valve repairs utilizing robotic techniques as well, which is really outside the ... no significant bleeding. Terry asks if you do robotic valve replacement surgeries. I do not. It's a ...

  5. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... his choice. Tariq asks, can we see one day that minimally invasive techniques to replace conventional heart ... rarely need those pacemaker wires after the first day after surgery. Okay, we have another question from ...

  6. Anterior Approach Total Hip Replacement

    Medline Plus

    Full Text Available ... Taperloc Microplasty stem and E-poly antioxidant-infused technology during a hip replacement through the anterior supine ... renewed interest at this time due to several advantages that it brings. The approach that is performed ...

  7. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... for patients who would not tolerate well a traditional open operation or a less invasive operation, as ... physical reserve. So Barbara Bush recently had a traditional aortic valve replacement surgery. What makes a patient ...

  8. Anterior Approach Total Hip Replacement

    Medline Plus

    Full Text Available ... an anterior approach total hip replacement with the patient on a regular OR table supine. My name ... less invasive without being small incision surgery. Obese patients can be easier due to less distribution of ...

  9. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... at the body's surface area. We, in the operating room, have a set of sizers which allow ... proves a nice replacement. However, that's sort of operating on two valves to fix one valvular problem. ...

  10. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... other cardiovascular diseases including heart attack and increased risk of cardiovascular death. John, is there anything you ... with time. This highlights the mortality or the risk of death associated with aortic valve replacement and ...

  11. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... so that they can report those to their physician. This may lead to earlier treatment and better ... instead of one. At this point, should my physician and I discuss a replacement?" And I know ...

  12. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... North Carolina. My name is John Streitman and I'm a cardiothoracic surgeon here at the Heart ... the corrective surgery of aortic valve replacement. If I have aortic stenosis, are there any activities that ...

  13. Anterior Approach Total Hip Replacement

    Medline Plus

    Full Text Available ... the benefits of the Taperloc Microplasty stem and E-poly antioxidant-infused technology during a hip replacement ... to your questions that you send in by e-mail. The e- mail button is at the ...

  14. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... Winkley nor myself have any financial or professional relationships with the manufacturers or the devices used in ... John, just to interrupt for moment, Charles, Charles V., asks can the mitral valve also be replaced ...

  15. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... back in World War II to look for things in the water. Basically, you use sound waves ... valve replacements a year. So one of the things I 10 would counsel anybody is before they ...

  16. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... thank you, Jim. This is obviously just a model of the heart just to give some perspective ... the aorta at this point. 9 Earlier this month Robin Williams had his aortic valve replaced and ...

  17. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... conditions or other significant medical problems, the American College of Cardiology recommends aortic valve replacement for basically ... more likely we see aortic stenosis. Again, patient education is part of the evaluation and management of ...

  18. Total Knee Replacement for Women

    Medline Plus

    Full Text Available ... ll be moderating a Zimmer Gender Solutions total knee, performed by my partner, Dr. Ken Gustke. At ... I’m going to be doing a total knee replacement utilizing the Gender Flex implants on a ...

  19. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... replacement surgery today but are there any catheter-base techniques that can be used to treat the ... just a model of the heart just to give some perspective before we start the first part ...

  20. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... a series of charts that we have, historical data, to know really what the best size is ... heart and lung circulation, so that we can open the aorta safely and replace this patient's aortic ...

  1. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... see aortic stenosis in patients younger, in their 40s and 50s, if they have congenitally bicuspid, or ... a year and, you know, probably 30 to 40 minimally invasive aortic valve replacements a year. So ...

  2. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... surgery. I think as physicians we owe a responsibility to our patients to try to make procedures ... patients back annually, which we feel is our responsibility any time we do valve replacement or repair ...

  3. The development and testing of new nicotine replacement treatments: from 'nicotine replacement' to 'smoking replacement'.

    Science.gov (United States)

    Hajek, Peter

    2015-07-01

    Griffith Edwards, unusually in the 1970s, saw tobacco use as falling within the remit of addiction research, and brought Michael Russell to the Addiction Research Unit [ARU] to initiate research into smoking. The work of the tobacco section of ARU paved the way to a better understanding of tobacco dependence and to developing nicotine replacement treatments. Michael Russell pioneered the idea of attractive nicotine replacement products with an acceptable safety profile replacing cigarettes on the open market and ending the tobacco epidemic, envisaging a transition from medicinal and temporary 'nicotine replacement' to recreational and potentially permanent 'smoking replacement'. Mike's prediction that the pharmaceutical industry would develop such devices did not materialize. Instead, two such products were generated by the tobacco industry (snus) and independent developers (electronic cigarettes). Another of Mike's hopes was that regulators would adopt rational policies, and that tobacco control activists would become supportive of smoking replacement once they thought through the implications. Until now, the 'smoking replacement' idea has been met with vigorous opposition from some tobacco control activists. The voices of researchers with historical links to ARU are prominent in arguing in favour of harm reduction and e-cigarettes. The most important debate ever to occur in tobacco control is under way and it carries the signature of Griffith Edwards' ARU. PMID:26042563

  4. Technological breakthroughs and asset replacement

    OpenAIRE

    YATSENKO, Yuri; Hritonenko, Natali

    2008-01-01

    The authors analyze the optimal replacement of assets under continuous and discontinuous technological change. They investigate the variable lifetime of assets in an infinite-horizon replacement problem. Due to deterioration, the maintenance cost increases when the asset becomes older. Because of technological change, both maintenance and new capital costs decrease for a fixed asset age. The dynamics of the optimal lifetime is investigated analytically and numerically under tec...

  5. Gray component replacement by direct colorimetric mapping

    Science.gov (United States)

    Zeng, Huanzhao

    1999-12-01

    A new gray component replacement approach for four-color printing process is developed to directly convert CIE XYZ values into CMYK values. We start with building a colorimetric density lookup table (LUT) for black channel from 0 to 255 (for 8-bit per-channel). A color in CIE XYZ color space is converted into colorimetric density, then the colorimetric density is compared with colorimetric densities in the black densities LUT to find maximum black. The actual black is determined based on the maximum black that has been found. The remaining of the total colorimetric density subtracted from the colorimetric density of the actual black is converted into CIE XYZ value, and finally the CIEXYZ value is converted into CMY by a predictive printer color mixing model. A close-up correction algorithm is implemented to reduce color errors coming from both the CIE XYZ to CMYK inversion and the assumption that the colorimetric density is additive.

  6. Investigations on sawdust and palm kernel shells as aggregate replacement

    OpenAIRE

    F. A. Olutoge

    2010-01-01

    The high and rising costs of building construction in developing countries have been a source of concern to government and private developers. This study investigated the use of saw dust and palm kernel shells (PKS) as replacement for fine and coarse aggregates in reinforced concrete slabs. Reinforced concrete slabs measuring 800 x 300 x 75mm were cast. Sawdust and PKS were used to replace both fine and coarse aggregates from 0% to 100% in steps of 25%. Flexural strengths were evaluated at 7,...

  7. Open Cow Replacement Decisions: an Application of Asset Replacement Theory

    OpenAIRE

    Ibendahl, Gregory A.; Anderson, John D.

    2001-01-01

    Beef producers must decide what to do with a cow that fails to conceive during the breeding season. Keeping the open cow results in a years expenses without any revenue. Replacing the open cow with a bred heifer provides immediate revenue although it will take a few years before the heifer reaches peak productivity. A net present value framework is employed to examine this decision. The problem is unique because the open cow and the replacement heifer have different life spans. Finding a comm...

  8. Preliminary study of possible ORELA replacement options

    International Nuclear Information System (INIS)

    Based on two conceptual design studies performed by the LANL Accelerator Technology Division, the possibilities in terms of accelerator systems for replacing ORELA with a more intense Maxwellian-type continuous-energy neutron source are summarized and discussed. The neutron intensities from ORELA are compared with those from existing or potential accelerator systems used for cross-section and condensed-matter studies. The best replacement options seem to involve a spallation source from 200- to 400-MeV protons on an ORELA-like target. Pulsing and intensity desiderata with such a source are discussed which correspond to a spectrum-averaged 100-fold improved figure of merit over ORELA for TOF measurements with only a tenfold increased source strength. Existing accelerator designs seem to be inadequate for such a source. Consequently, two conceptual designs were developed for this study by the LANL Accelerator Technology Division. The first conceptual design is for a 200-MeV large linac capable of accelerating 1.3 A during a macropulse; this linac standing alone could serve as an ORELA replacement source. The second conceptual design is for a much smaller 250-MeV PIGMI linac with a 28-mA macropulse current which feeds a proton accumulator ring and bunch-compressor transport line. This linac-ring-compressor (LIRIC) option would give a more cost-effective neutron source for cross-section measurements, whereas the large linac, or a modified version of it, would give a much simpler system more suitable for expansion. In particular, both conceptual designs would incorporate the present ORELA building and would provide approximately 100-fold improved neutron sources over ORELA for cross-section measurements. The total estimated cost of the LIRIC system would be $43M (1984), whereas the cost of the large linac would be about a factor of two more. 55 references, 11 figures, 19 tables

  9. Reactor building

    International Nuclear Information System (INIS)

    The whole reactor building is accommodated in a shaft and is sealed level with the earth's surface by a building ceiling, which provides protection against penetration due to external effects. The building ceiling is supported on walls of the reactor building, which line the shaft and transfer the vertical components of forces to the foundations. The thickness of the walls is designed to withstand horizontal pressure waves in the floor. The building ceiling has an opening above the reactor, which must be closed by cover plates. Operating equipment for the reactor can be situated above the building ceiling. (orig./HP)

  10. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  11. Minimally invasive aortic valve replacement

    DEFF Research Database (Denmark)

    Foghsgaard, Signe; Schmidt, Thomas Andersen; Kjaergard, Henrik K

    2009-01-01

    . The 30-day mortality rate for the 98 patients was zero, although 14 of the 98 mini-sternotomies had to be converted to complete sternotomies intraoperatively due to technical problems. Such conversion doubled the operative time over that of the planned full sternotomies. In the group of patients whose......In this descriptive prospective study, we evaluate the outcomes of surgery in 98 patients who were scheduled to undergo minimally invasive aortic valve replacement. These patients were compared with a group of 50 patients who underwent scheduled aortic valve replacement through a full sternotomy...... operations were completed as mini-sternotomies, 4 died later of noncardiac causes. The aortic cross-clamp and perfusion times were significantly different across all groups (P < 0.001), with the intended full-sternotomy group having the shortest times. In conclusion, the mini-aortic valve replacement is an...

  12. Molecular replacement: tricks and treats

    International Nuclear Information System (INIS)

    To be successful, molecular replacement relies on the quality of the model and of the crystallographic data. Some tricks that could be applied to the models or to the crystal to increase the success rate of MR are discussed here. Molecular replacement is the method of choice for X-ray crystallographic structure determination provided that suitable structural homologues are available in the PDB. Presently, there are ∼80 000 structures in the PDB (8074 were deposited in the year 2012 alone), of which ∼70% have been solved by molecular replacement. For successful molecular replacement the model must cover at least 50% of the total structure and the Cα r.m.s.d. between the core model and the structure to be solved must be less than 2 Å. Here, an approach originally implemented in the CaspR server (http://www.igs.cnrs-mrs.fr/Caspr2/index.cgi) based on homology modelling to search for a molecular-replacement solution is discussed. How the use of as much information as possible from different sources can improve the model(s) is briefly described. The combination of structural information with distantly related sequences is crucial to optimize the multiple alignment that will define the boundaries of the core domains. PDB clusters (sequences with ≥30% identical residues) can also provide information on the eventual changes in conformation and will help to explore the relative orientations assumed by protein subdomains. Normal-mode analysis can also help in generating series of conformational models in the search for a molecular-replacement solution. Of course, finding a correct solution is only the first step and the accuracy of the identified solution is as important as the data quality to proceed through refinement. Here, some possible reasons for failure are discussed and solutions are proposed using a set of successful examples

  13. Renal replacement therapy in ICU

    Directory of Open Access Journals (Sweden)

    C Deepa

    2012-01-01

    Full Text Available Diagnosing and managing critically ill patients with renal dysfunction is a part of the daily routine of an intensivist. Acute kidney insufficiency substantially contributes to the morbidity and mortality of critically ill patients. Renal replacement therapy (RRT not only does play a significant role in the treatment of patients with renal failure, acute as well as chronic, but also has spread its domains to the treatment of many other disease conditions such as myaesthenia gravis, septic shock and acute on chronic liver failure. This article briefly outlines the role of renal replacement therapy in ICU.

  14. Building America

    Energy Technology Data Exchange (ETDEWEB)

    Brad Oberg

    2010-12-31

    IBACOS researched the constructability and viability issues of using high performance windows as one component of a larger approach to building houses that achieve the Building America 70% energy savings target.

  15. Building integrated photovoltaic; Photovaltaique integre aux batiments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-01-01

    Durable, modular and flexible in use, as demonstrated by the different case studies in this publication, photovoltaic can replace diverse building elements, from glass facades to weather proof roofs. This leaflet towards architects describes aesthetic, technical, economic and environmental interest of building integrated photovoltaic. (author)

  16. Solar building

    OpenAIRE

    Zhang, Luxin

    2014-01-01

    In my thesis I describe the utilization of solar energy and solar energy with building integration. In introduction it is also mentioned how the solar building works, trying to make more people understand and accept the solar building. The thesis introduces different types of solar heat collectors. I compared the difference two operation modes of solar water heating system and created examples of solar water system selection. I also introduced other solar building applications. It is conv...

  17. Building 2000

    International Nuclear Information System (INIS)

    This is the first volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this first rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In a second volume, a similar series of studies is presented for the building categories: office buildings, public buildings and hotels and holiday complexes. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (15 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  18. Anterior Approach Total Hip Replacement

    Medline Plus

    Full Text Available ... during a hip replacement through the anterior supine intramuscular approach. “OR-Live,” the vision of improving health. ... the approach are operating through an internervous and intramuscular anatomic interval. It’s not necessary to detach any ...

  19. Anterior Approach Total Hip Replacement

    Medline Plus

    Full Text Available ... of the Taperloc Microplasty stem and E-poly antioxidant-infused technology during a hip replacement through the ... a little diaper so we’re seeing less skin and more -- Here we go. Here’s what we’ ...

  20. Replacement policies for dairy cows

    DEFF Research Database (Denmark)

    Nielsen, Lars Relund

    In a recent paper a hierarchical Markov decision processes (MDP) with finite state and action space was formulated for the dairy cow replacement problem with stage lengths of 1 d. Bayesian updating was used to predict the performance of each cow in the herd and economic decisions were based on the...

  1. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... Terry asks if you do robotic valve replacement surgeries. I do not. It's a good question. You know, there's a handful of surgeons, frankly, in the world that I think do enough robotic cardiac surgery, whether it be valve surgery or coronary bypass ...

  2. Minimally Invasive Aortic Valve Replacement

    Medline Plus

    Full Text Available ... valve in the aortic position will grow over time and proves a nice replacement. However, that's sort of operating on two valves to fix one valvular problem. And for most patients in our practice in their 50s, 60s, et cetera, we tend ...

  3. Some remarks on Unequal Probability Sampling Designs Without Replacement

    OpenAIRE

    TILLE, Yves

    1996-01-01

    A set of demands is presented which should be satisfied by a good unequal-probability sampling method without replacement. First it is shown that some of these demands are contradictory. ln particular, it is shown that a sequential algorithm that ensures strictly positive joint inclusion probabilities does not exist; not does there exist a sequential procedure that yields a result which is not dependent on the order of units in the data file. Next, a way is discussed to build approximations o...

  4. Electrifying the construction process : Replacing diesel engines with electric motors

    OpenAIRE

    Willerström, Jakob; Linde, Adam; Fagrell, Johannes

    2015-01-01

    Diesel engines are commonly used in construction machines, for example excavators. In a diesel engine, the combustion of diesel is a process with a considerable environmental impact, with high amounts of emitted greenhouse gases. The bachelor thesis creates a model that investigates the potential of decreasing the environmental impact when replacing diesel engines with electric motors in the construction phase of the construction process of buildings. The model was made in three steps. In the...

  5. Urbanization, Ikization, and Replacement Dynamics

    CERN Document Server

    Chen, Yanguang

    2015-01-01

    The phenomenon of Iks was first found by anthropologists and biologists, but it is actually a problem of human geography. However, it has not yet drawn extensive attention of geographers. In this paper, a hypothesis of ikization is presented that sudden and violent change of geographical environments results in dismantling of traditional culture, which then result in collective depravity of a nationality. By quantitative analysis and mathematical modeling, the causality between urbanization and ikization is discussed, and the theory of replacement dynamics is employed to interpret the process of ikization. Urbanization is in essence a nonlinear process of population replacement. Urbanization may result in ikization because that the migration of population from rural regions to urban regions always give rise to abrupt changes of geographical environments and traditional culture. It is necessary to protect the geographical environment against disruption, and to inherit and develop traditional culture in order t...

  6. [MINIMALLY INVASIVE AORTIC VALVE REPLACEMENT].

    Science.gov (United States)

    Tabata, Minoru

    2016-03-01

    Minimally invasive aortic valve replacement (MIAVR) is defined as aortic valve replacement avoiding full sternotomy. Common approaches include a partial sternotomy right thoracotomy, and a parasternal approach. MIAVR has been shown to have advantages over conventional AVR such as shorter length of stay and smaller amount of blood transfusion and better cosmesis. However, it is also known to have disadvantages such as longer cardiopulmonary bypass and aortic cross-clamp times and potential complications related to peripheral cannulation. Appropriate patient selection is very important. Since the procedure is more complex than conventional AVR, more intensive teamwork in the operating room is essential. Additionally, a team approach during postoperative management is critical to maximize the benefits of MIAVR. PMID:27295772

  7. Building 2000

    International Nuclear Information System (INIS)

    This is the second volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this second rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In the first volume, a similar series of studies is presented for the building categories: schools, laboratories and universities, and sports and educational centres. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (11 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  8. Solvent replacement for green processing.

    OpenAIRE

    Sherman, J.; Chin, B.; Huibers, P D; Garcia-Valls, R.; Hatton, T A

    1998-01-01

    The implementation of the Montreal Protocol, the Clean Air Act, and the Pollution Prevention Act of 1990 has resulted in increased awareness of organic solvent use in chemical processing. The advances made in the search to find "green" replacements for traditional solvents are reviewed, with reference to solvent alternatives for cleaning, coatings, and chemical reaction and separation processes. The development of solvent databases and computational methods that aid in the selection and/or de...

  9. Reoperations Following Cervical Disc Replacement

    OpenAIRE

    Skovrlj, Branko; Lee, Dong-Ho; Caridi, John Michael; Cho, Samuel Kang-Wook

    2015-01-01

    Cervical disc replacement (CDR) has emerged as an alternative surgical option to cervical arthrodesis. With increasing numbers of patients and longer follow-ups, complications related to the device and/or aging spine are growing, leaving us with a new challenge in the management and surgical revision of CDR. The purpose of this study is to review the current literature regarding reoperations following CDR and to discuss about the approaches and solutions for the current and future potential c...

  10. The Replacement of Missing Teeth

    OpenAIRE

    Zarb, George A.

    1988-01-01

    Dentists have used a great deal of ingenuity in replacing lost teeth. Until recently, however, it was not possible to duplicate the natural situation and attach tooth-root analogues to the host bone. Osseointegration allows such an attachment, in which threaded unalloyed titanium implants are placed in the bone by means of a meticulous surgical procedure. The documented successful use of this process has already altered profoundly the predicament of the edentulous patient. The application of ...

  11. VAT replacement or better administration?

    OpenAIRE

    Vitaliy Bigdai; Richard Frensch; Natalie Leschenko

    2004-01-01

    VAT revenues in Ukraine are undermined by numerous privileges and low tax compliance due to manipulations and/or outright fraud causing inadequate tax collection and high tax refunds claims. Besides, there are both strong concerns about the vulnerability of the VAT system to corruption and complaints from businesses about delays in refunding. Feasible options to overcome the low VAT revenue problem include replacing VAT, e.g., with a general sales tax (GST), or improving VAT administration. W...

  12. Revenue Recovery Through Meter Replacement

    OpenAIRE

    Shields, Devan J.

    2011-01-01

    Previous studies have identified water meter inaccuracy at low flow rates as a significant source of non-revenue flow for water systems; however a lack of available data makes it difficult to include low flow accuracy degradation in meter replacement plans. This thesis examines results from an extensive accuracy test program carried out at the Utah Water Research Laboratory on small water meters over a wide range of flow rates and at various levels of throughput. The study compares expected a...

  13. Results of Austin Moore replacement.

    Directory of Open Access Journals (Sweden)

    Jadhav A

    1996-04-01

    Full Text Available Forty cases of Austin Moore Replacement done for transcervical fractures of the femur in patients were reviewed after a period of 12 to 48 months postoperatively (mean 26 mth. 30 cases (75% had mild to severe pain of non-infective origin, starting as early as 6 months postoperatively. This was irrespective of the make, size or position (varus/valgus of the prosthesis. Though the Aufranc and Sweet clinical scoring was satisfactory in 65% cases, radiological evidence of complications like sinking, protrusion, etc. were seen in majority of the cases. Calcar resorption was seen in 34 cases (85% as early as 4 months postoperatively. Results of THR and bipolar replacement done for transcervical fractures in recent literature show 85% pain-free cases at 5 years. We feel that Austin Moore Replacement should be reserved for patients more than 65 years of age and those who are less active or debilitated because of other factors, because of increased acetabular wear with time in the younger individual. This is corroborated by unsatisfactory results in patients less than 65 years of age (p < 0.05.

  14. BWR control blade replacement strategies

    International Nuclear Information System (INIS)

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B4C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  15. Replacing magnets at the LHC

    CERN Multimedia

    LHC, LSI2, Point 4

    2013-01-01

    CERN engineers have been working through the night this week to move the final replacement dipole magnets into position on the Large Hadron Collider (LHC). Though there are several still to go, the teams expect to have completed the task by the end of this month. Dipole magnets bend the paths of particles as they travel around the circular accelerator. Of the LHC's 1232 dipoles – each 15 metres long and weighing 35 tonnes – 15 are being replaced as part of the long shutdown of CERN's accelerator complex. These 15 magnets suffered wear and tear during the LHC's first 4-year run. Three quadrupole-magnet assemblies – which help to focus particles into a tight beam – have also been replaced. Moving such heavy magnets requires specially adapted cranes and trailers both above and below ground. There are several access points on the LHC. Some, such as the 100-metre vertical access shaft down to the ALICE experiment, are equipped with lifts to allow technical personnel and visitors down to the caverns. Other ...

  16. Laboratory Building.

    Energy Technology Data Exchange (ETDEWEB)

    Herrera, Joshua M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-01

    This report is an analysis of the means of egress and life safety requirements for the laboratory building. The building is located at Sandia National Laboratories (SNL) in Albuquerque, NM. The report includes a prescriptive-based analysis as well as a performance-based analysis. Following the analysis are appendices which contain maps of the laboratory building used throughout the analysis. The top of all the maps is assumed to be north.

  17. Media and Australia's replacement reactor project

    International Nuclear Information System (INIS)

    In September 1997, the Commonwealth Government of Australia announced a proposal to build a replacement nuclear research reactor at Lucas Heights in Sydney. Extensive public consultation, parliamentary debate and independent reports were prepared to ensure that the new facility would meet strict international requirements, national safety and environmental standards, and performance specifications servicing the needs of Australia - for decades to come. On 6 June 2000, Argentine company INVAP SE was announced as the preferred tenderer. In July 2000 contracts were signed between INVAP and the Australian Nuclear Science and Technology Organisation for the construction the replacement reactor, due to be completed in 2005. In order to retain a strong local presence, INVAP undertook a joint venture with two of Australia's foremost heavy construction businesses. Briefly the new research reactor will be a replacement for the ageing Australian Reactor (HIFAR). Nuclear science and technology, in Australia, is no stranger to media controversy and misinformation. Understandably the announcement of a preferred tenderer followed by the signing of contracts, attracted significant national and international media attention. However in the minds of the media, the issue is far from resolved and is now a constant 'news story' in the Australian media. Baseless media stories have made claims that the project will cost double the original estimates; question the credibility of the contractors; and raise issues of international security. The project is currently linked with Australia's requirements for long term nuclear waste management and there has been an attempt to bring national Indigenous People's issues into play. Some of these issues have been profiled in the press internationally. So, just to set the record straight and give you an appropriate impression of what's 'really happening' I would like to highlight a few issues, how ANSTO dealt with these, and what was finally reported

  18. Window replacement and residential lead paint hazard control 12 years later.

    Science.gov (United States)

    Dixon, Sherry L; Jacobs, David E; Wilson, Jonathan W; Akoto, Judith Y; Nevin, Rick; Scott Clark, C

    2012-02-01

    Window replacement is a key method of reducing childhood lead exposure, but the long-term effectiveness has not been previously evaluated. Windows have the highest levels of interior lead paint and dust compared to other building components. Our objective was to conduct a follow-up study of residential window replacement and lead hazard control 12 years after homes were enrolled in an evaluation of the HUD Lead Hazard Control Grant Program, sampling settled lead dust in housing in four cities (n=189 homes). Previous work evaluated lead hazard controls up to 6 years after intervention using dust lead measurements and two years after intervention using both dust and blood lead data. But the earlier work could not examine the effect of window replacement over the longer time period examined here: 12 years. The individual homes were assigned to one of three categories, based on how many windows had been replaced: all replacement, some replacement, or non-replacement. Windows that were not replaced were repaired. We controlled for covariates such as site, housing condition, presence of lead paint, and season using longitudinal regression modeling. Adjusted floor and sill dust lead geometric mean dust lead loadings declined at least 85% from pre-intervention to 12 years after the intervention for homes with all replacement windows, some windows replaced and no windows replaced. Twelve years after intervention, homes with all replacement windows had 41% lower interior floor dust lead, compared to non-replacement homes (1.4 versus 2.4 μg/ft2, psafe window replacement is an important element of lead hazard control, weatherization, renovation and housing investment strategies and should be implemented broadly to protect children. PMID:22325333

  19. [Hemophilia B replacement therapy drugs].

    Science.gov (United States)

    Yan, Hong; Zeng, Fanyi

    2016-02-01

    Hemophilia B is an X chromosome linked hereditary hemorrhagic disease, which is caused by the lose function mutation of factor IX (FIX), and significantly affects the patients' lifespan and life quality. The severity of hemophilia B depends on the FIX level in the plasma. By referring to the relevant literatures, we reviewed and summarized hemophilia B replacement therapies. Specifically, we focus on recombinant factor IX products on the market and those in the pipeline, especially on the long-acting factor IX drugs, to provide the basis for researches of new hemophilia B drugs. PMID:27382766

  20. Radiology of total hip replacement

    Energy Technology Data Exchange (ETDEWEB)

    Griffiths, H.J.; Lovelock, J.E.; McCollister Evarts, C.; Geyer, D.

    1984-06-01

    The radiology of total hip replacement (THR) and its complications is reviewed in conjunction with a long-term follow-up study on 402 patients with 501 prostheses. The indications, contraindications, biomechanics, and operative management of these patients is discussed. Clinical complications such as deep vein thrombosis, pulmonary embolism, and hemorrhage are mentioned. Postoperative infections including granulomatous pseudotumors, dislocations and fractures, true loosening of the prosthesis, and heterotopic bone formation (HBF) are discussed and illustrated. The importance of differentiating the lucent line from true loosening is stressed. Mechanical and other clinical complications which are largely ignored by radiologists are also discussed. The uses of arthrography and bone scanning are included.

  1. Nuclear power plant computer replacement

    International Nuclear Information System (INIS)

    Consumers Power Company (CPCo) has recently completed an ambitious project to replace the non-safety-related plant process computer for the Palisades Nuclear Plant. The replacement computer retains the functions of the old plant computer system with minor exceptions. However, the architecture of the new computer system is vastly improved from the old plant computer. The hardware and software components of the new computer system are the state of the art. The old system consisted of five stand-alone computers, each performing their intended function separately. The new architecture employs a number of computing and data acquisition nodes networked together to gather, share, process, present, and store data more efficiently. For cost efficiency, some of the old hardware, such as the Critical Functions Monitoring System multiplexer, has been retained. The new computer system has a significantly higher availability, and lower maintenance cost. It performs certain functions that were not possible with the old system, such as real-time validation of rod position monitored by the Plant Information Processor and the Secondary Position Indicator. While the new computer system is more capable, more reliable, more user friendly, and easier to maintain, taking it to operability status presented CPCo with some new and challenging issues

  2. REMINDER REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division; Cards.Service@cern.ch

    2001-01-01

    The French Ministry of Foreign Affairs is currently replacing all diplomatic cards, special cards and employment permits («attestations de fonctions») held by members of the personnel and their families. These cards are replaced by secure, computerized equivalents. The old cards may no longer be used after 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015) between 8h30 and 12h30, in order to fill in a «fiche individuelle» form, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format, the French card in their possession, an A4 photocopy of the same French card, certified by the cards office as being a true copy. Those members of the personnel whose cards (and/or cards belonging to members of their families) are shortly due to expire, or have recently done so, are also requested...

  3. The future of nicotine replacement.

    Science.gov (United States)

    Russell, M A

    1991-05-01

    Following in the wake of progress forged by nicotine chewing gum, a new generation of nicotine replacement products will soon be available as aids to giving up smoking. These range from nicotine skin patches, which take 6-8 hrs to give very flat steady-state peak blood levels, to nicotine vapour inhalers which mimic the transient high-nicotine boli that follow within a few seconds of each inhaled puff of cigarette smoke. Other products undergoing clinical trials include a nasal nicotine spray and nicotine lozenges. It is argued here that it is not so much the efficacy of new nicotine delivery systems as temporary aids to cessation, but their potential as long-term alternatives to tobacco that makes the virtual elimination of tobacco a realistic future target. Their relative safety compared with tobacco is discussed. A case is advanced for selected nicotine replacement products to be made as palatable and acceptable as possible and actively promoted on the open market to enable them to compete with tobacco products. They will also need health authority endorsement, tax advantages and support from the anti-smoking movement if tobacco use is to be gradually phased out altogether. PMID:1859935

  4. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... replacement. At the end, we'll try and go over some questions of some common topics that come up when talking about partial knee replacements. So, let's get to our patient. She's a 42-year- ...

  5. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... Advil and anti-inflammatories, as well as some physical therapy. Continuing with other non-operative treatment modalities, she ... is the full knee replacement. Some of the benefits of a partial knee replacement include a less ...

  6. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... is the full knee replacement. Some of the benefits of a partial knee replacement include a less ... get a lot of information, both on the Internet, from other doctors, from friends, and I think ...

  7. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... doesn't have a lot of the mechanical sensations that a total knee replacement patient has, they ... a full knee replacement probably has a better sense of which one will be more helpful for ...

  8. Estrogen and Progestin (Hormone Replacement Therapy)

    Science.gov (United States)

    Combinations of estrogen and progestin are used to treat certain symptoms of menopause. Estrogen and progestin are two female sex hormones. Hormone replacement therapy works by replacing estrogen hormone that is no longer being made by ...

  9. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... aspect of the partial knee replacement at this stage is you'll see another cut in the ... all practice components. Now how important is this stage, Dr. McCauley, during the knee replacement? Well, it's ...

  10. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... bones grinding against each other, leading to pain, stiffness and inflammation. At times in younger patients this ... full knee replacement, what are the risks of stiffness with a partial knee replacement? Yeah, also known ...

  11. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... to a full knee replacement, what are the risks of stiffness with a partial knee replacement? Yeah, also known as arthrofibrosis for the doctors out there, knee surgery has a very - on average a pretty high ...

  12. B Plant process piping replacement feasibility study

    International Nuclear Information System (INIS)

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace

  13. B Plant process piping replacement feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Howden, G.F.

    1996-02-07

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

  14. 48 CFR 8.715 - Replacement commodities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Replacement commodities. 8... Are Blind or Severely Disabled 8.715 Replacement commodities. When a commodity on the Procurement List is replaced by another commodity which has not been previously acquired, and a qualified...

  15. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    ‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which......, which gives the book a challenging contribution to the existing body of knowledge....

  16. Molecular replacement then and now

    International Nuclear Information System (INIS)

    A brief overview, with examples, of the evolution of molecular-replacement methods and models over the past few years is presented. The ‘phase problem’ in crystallography results from the inability to directly measure the phases of individual diffracted X-ray waves. While intensities are directly measured during data collection, phases must be obtained by other means. Several phasing methods are available (MIR, SAR, MAD, SAD and MR) and they all rely on the premise that phase information can be obtained if the positions of marker atoms in the unknown crystal structure are known. This paper is dedicated to the most popular phasing method, molecular replacement (MR), and represents a personal overview of the development, use and requirements of the methodology. The first description of noncrystallographic symmetry as a tool for structure determination was explained by Rossmann and Blow [Rossmann & Blow (1962 ▶), Acta Cryst.15, 24–31]. The term ‘molecular replacement’ was introduced as the name of a book in which the early papers were collected and briefly reviewed [Rossmann (1972 ▶), The Molecular Replacement Method. New York: Gordon & Breach]. Several programs have evolved from the original concept to allow faster and more sophisticated searches, including six-dimensional searches and brute-force approaches. While careful selection of the resolution range for the search and the quality of the data will greatly influence the outcome, the correct choice of the search model is probably still the main criterion to guarantee success in solving a structure using MR. Two of the main parameters used to define the ‘best’ search model are sequence identity (25% or more) and structural similarity. Another parameter that may often be undervalued is the quality of the probe: there is clearly a relationship between the quality and the correctness of the chosen probe and its usefulness as a search model. Efforts should be made by all structural biologists to

  17. Planning and licensing two replacement nuclear power plants in Switzerland

    International Nuclear Information System (INIS)

    Switzerland is facing the challenges of steadily rising electricity consumption and an aging pool of power plants. Its electricity mix of roughly 60% hydroelectric power and 40% nuclear power is the reason for its excellent carbon balance in electricity production. Consequently, replacement must be found for the oldest nuclear power plants and for future electricity import contracts. Security of supply, environmental protection, and economic performance must be taken into account in equal proportions. For the overarching strategic project of a ''replacement nuclear power plant'', 2 of the big Swiss electricity utilities, Axpo and BKW, in 2008 jointly founded a project development company, Resun AG. Performing the project design work in a joint effort allows synergies to be exploited and expenses to be focused. The 2003 Nuclear Power Act (KEG) of Switzerland provides a 3-stage plant licensing procedure. In addition, the political system in Switzerland offers a number of possibilities for involvement and participation at various stages in the licensing procedure of new nuclear power plants. The political debate about the future energy policy of Switzerland was triggered for good when the framework applications for approval of the replacement nuclear power plants were submitted. Construction of the replacement nuclear power plants corresponds to the political strategy, communicated by the Federal Council, to ensure future energy supply also by building new large power plants. (orig.)

  18. Complications after total hip replacement

    International Nuclear Information System (INIS)

    Complications seen after long-term follow-up examinations of total hip replacement should be treated immediately and completely. In the past decade a considerable increase in revisions has been noted. Radiographic assessment may be regarded as an effective means in diagnosing prosthetic complications from the surgeon's point of view. Examples are given. The difficulties in radiographic assessment of complications after cementless implanation or cemented prostheses without contrast media are mentioned. Prosthesis-related complications, such as mechanical loosening, infection with and without loosening, fatigue fractures and wear, fractures of the femur or pelvis, dislocations and surgical failures, are illustrated, as are clinical courses with gross loss of bone stock after repeated surgery and delayed revisions. Complications not related to the prosthesis such as periarticular ossification, muscle deficiencies, and nervous and vascular lesions are also explained using examples. (orig.)

  19. Ion beams replace chrome plating

    International Nuclear Information System (INIS)

    Metal ion implantation is the process of altering surface properties by bombarding with high-energy metal ions. Because the process does not produce a coating, dimensions and bulk properties of the part remain unchanged, and implanted surfaces have no problems with adhesion, residual stress, or poor microstructure. Implanted surfaces can provide wear and/or corrosion resistance comparable with, or superior to, chrome plating. Furthermore, it is a relatively low-temperature process, which enables treatment of materials such as plastics, aluminum, and low-alloy steel. Furthermore, the performance of coatings can be improved by bombarding with ions during or after the coating process. Specifically, high-energy ions applied during deposition have been shown to reduce the required temperature for physical vapor deposition (PVD) systems, overcoming one of the major obstacles to replacing chromium plating with PVD coatings. This article will review the latest advances in metal-ion implantation equipment, with particular reference to economics and applications

  20. The Attenborough total knee replacement.

    Science.gov (United States)

    Attenborough, C G

    1978-08-01

    The stabilised gliding knee prosthesis is a compromise between hinged joints and condylar prostheses. It is a two-piece implant designed to allow normal gliding movements of flexion and extension and which, stabilised by a connecting rod between the femoral and tibial components, allows a designed laxity of rotation and lateral movements. A modification of the original femoral component is described. Two hundred and forty-five knee replacement operations have been done between January 1973 and September 1977 and the results are reported. The results using this prosthesis are at least equal to those using hinged or condylar prostheses. So far there has been no case of spontaneous loosening of the components and the implant can be used in patients who, because of severe deformities and instability, are unsuitable for condylar prostheses. PMID:681407

  1. Reactor building

    International Nuclear Information System (INIS)

    The present invention concerns a structure of ABWR-type reactor buildings, which can increase the capacity of a spent fuel storage area at a low cost and improved earthquake proofness. In the reactor building, the floor of a spent fuel pool is made flat, and a depth of the pool water satisfying requirement for shielding is ensured. In addition, a depth of pool water is also maintained for a equipment provisionally storing pool for storing spent fuels, and a capacity for a spent fuel storage area is increased by utilizing surplus space of the equipment provisionally storing pool. Since the flattened floor of the spent fuel pool is flushed with the floor of the equipment provisionally storing pool, transfer of horizontal loads applied to the building upon occurrence of earthquakes is made smooth, to improve earthquake proofness of the building. (T.M.)

  2. Building Languages

    Science.gov (United States)

    ... family's native language) is taught as the child's second language through reading, writing, speech, and use of residual ... that parents can use to help their child learn language. There are many types of building blocks, and ...

  3. Cost justification of chiller replacement

    International Nuclear Information System (INIS)

    We often hear of products with paybacks that are too good to be true. Just a few weeks ago,a client received a recommendation from a national service company's local office. In the letter the company recommended that open-quotes due to the age and condition of the boiler ... that the school consider replacing the boiler... The cost for the new boiler can usually be recovered by lower fuel bills in 2 to 3 yearsclose quotes. This was for an installation in Southeast Texas where the boiler is only used 4 to 5 months per year. Analysis show the above claims to be nonsense. A new boiler would cost about $47,000 installed. Current total gas bills for the facility are $15,630 per year. They would have to shutoff the gas to the facility to have a three year payback. In fact, only two-thirds of the gas is used to heat the facility so we have only $10, 000 to write off against the new boiler. How much will the greater efficiency save? A 30% savings due to greater efficiency produces $3,000 per year in gas savings to offset the $47,000 cost, a 16 year payback. And much of the efficiency savings can be realized by adjusting the existing boiler. In another care a client wanted to investigate replacement of a twenty year old chiller plant with more efficient equipment. We investigated the project and determined that the payback would be greater than ten years. They did not operate the equipment during the summer and at less than 50% of capacity the balance of the year

  4. Leptin replacement improves cognitive development.

    Directory of Open Access Journals (Sweden)

    Gilberto J Paz-Filho

    Full Text Available BACKGROUND: Leptin changes brain structure, neuron excitability and synaptic plasticity. It also regulates the development and function of feeding circuits. However, the effects of leptin on neurocognitive development are unknown. OBJECTIVE: To evaluate the effect of leptin on neurocognitive development. METHODOLOGY: A 5-year-old boy with a nonconservative missense leptin gene mutation (Cys-to-Thr in codon 105 was treated with recombinant methionyl human leptin (r-metHuLeptin at physiologic replacement doses of 0.03 mg/kg/day. Cognitive development was assessed using the Differential Ability Scales (DAS, a measure of general verbal and nonverbal functioning; and selected subtests from the NEPSY, a measure of neuropsychological functioning in children. PRINCIPAL FINDINGS: Prior to treatment, the patient was morbidly obese, hypertensive, dyslipidemic, and hyperinsulinemic. Baseline neurocognitive tests revealed slower than expected rates of development (developmental age lower than chronological age in a majority of the areas assessed. After two years, substantial increases in the rates of development in most neurocognitive domains were apparent, with some skills at or exceeding expectations based on chronological age. We also observed marked weight loss and resolution of hypertension, dyslipidemia and hyperinsulinemia. CONCLUSIONS: We concluded that replacement with r-metHuLeptin is associated with weight loss and changes in rates of development in many neurocognitive domains, which lends support to the hypothesis that, in addition to its role in metabolism, leptin may have a cognitive enhancing role in the developing central nervous system. TRIAL REGISTRATION: ClinicalTrials.gov NCT00659828.

  5. OPTIMUM ORDERING POLICY FOR PREVENTIVE AGE REPLACEMENT

    Institute of Scientific and Technical Information of China (English)

    Young T.PARK; Jing SUN

    2009-01-01

    Most of the spare ordering policies treated up to now have assumed that preventive and corrective replacement costs are equal, which implies in essential that there is no significant need for preventive replacement. This paper presents an ordering policy for preventive age replacement with minimal repair. Introducing the replacement, repair, inventory holding and shortage costs, the expected cost rate is derived. A procedure to determine jointly the ordering time for a spare and the preventive replacement time for the operating unit so as to minimize the expected cost rate is proposed. To explain the ordering policy and the optimization procedure, a numerical example is also included.

  6. Australia's replacement research reactor project

    International Nuclear Information System (INIS)

    HIFAR, a 10 MW tank type DIDO Class reactor has operated at the Lucas Heights Science and Technology Centre for 43 years. HIFAR and the 10 kW Argonaut reactor 'Moata' which is in the Care and Maintenance phase of decommissioning are Australia's only nuclear reactors. The initial purpose for HIFAR was for materials testing to support a nuclear power program. Changing community attitude through the 1970's and a Government decision not to proceed with a planned nuclear power reactor resulted in a reduction of materials testing activities and a greater emphasis being placed on neutron beam research and the production of radioisotopes, particularly for medical purposes. HIFAR is not fully capable of satisfying the expected increase in demand for medical radiopharmaceuticals beyond the next 5 years and the radial configuration of the beam tubes severely restricts the scope and efficiency of neutron beam research. In 1997 the Australian Government decided that a replacement research reactor should be built by the Australian Nuclear Science and Technology Organisation at Lucas Heights subject to favourable results of an Environmental Impact Study. The Ei identified no reasons on the grounds of safety, health, hazard or risk to prevent construction on the preferred site and it was decided in May 1999 that there were no environmental reasons why construction of the facility should not proceed. In recent years ANSTO has been reviewing the operation of HIFAR and observing international developments in reactor technology. Limitations in the flexibility and efficiency achievable in operation of a tank type reactor and the higher intrinsic safety sought in fundamental design resulted in an early decision that the replacement reactor must be a pool type having cleaner and higher intensity tangential neutron beams of wider energy range than those available from HIFAR. ANSTO has chosen to use it's own resources supported by specialised external knowledge and experience to identify

  7. Replacement of flux detectors at Embalse NPP

    International Nuclear Information System (INIS)

    Full text: The work began replacing, in first place, the units with flux mapping detectors only, taking care not to replace detectors of the reactor regulation system and safety systems in order do not have an impairment on the safety systems in case of replacement program's interruption during the first steps of replacements. During the phase of connectors installing in the seventh vertical flux unit (7th VFD) the original Twinax cable was found with a lack of its original properties. The internal conductor insulation was stiffened. For that reason, the internal conductor insulation became very difficult to handle without possible cable damage. Immediately, it was decided to stop the detectors replacement because the general schedule of the outage must delayed by the additional unexpected task of cable replacement. Besides, properly replacement cable was not available at de plant. A series of insulation measurements were made on the detectors cables, including those which were not replaced. A periodical control of insulation resistance measures of detectors and cables was arranged to be carried out during normal operation, until the next outage. In the next Annual Outage the detectors replacement was completed and the PVC cables was replaced by KKK cables with EQ requirements At the present a decision making process must be realized taking into account the Long Term Operation of Plant. (author)

  8. Visual Image Sensor Organ Replacement

    Science.gov (United States)

    Maluf, David A.

    2014-01-01

    This innovation is a system that augments human vision through a technique called "Sensing Super-position" using a Visual Instrument Sensory Organ Replacement (VISOR) device. The VISOR device translates visual and other sensors (i.e., thermal) into sounds to enable very difficult sensing tasks. Three-dimensional spatial brightness and multi-spectral maps of a sensed image are processed using real-time image processing techniques (e.g. histogram normalization) and transformed into a two-dimensional map of an audio signal as a function of frequency and time. Because the human hearing system is capable of learning to process and interpret extremely complicated and rapidly changing auditory patterns, the translation of images into sounds reduces the risk of accidentally filtering out important clues. The VISOR device was developed to augment the current state-of-the-art head-mounted (helmet) display systems. It provides the ability to sense beyond the human visible light range, to increase human sensing resolution, to use wider angle visual perception, and to improve the ability to sense distances. It also allows compensation for movement by the human or changes in the scene being viewed.

  9. The Australian Replacement Research Reactor

    Science.gov (United States)

    Kennedy, Shane; Robinson, Robert

    2004-03-01

    The 20-MW Australian Replacement Research Reactor represents possibly the greatest single research infrastructure investment in Australia's history. Construction of the facility has commenced, following award of the construction contract in July 2000, and the construction licence in April 2002. The project includes a large state-of-the-art liquid deuterium cold-neutron source and supermirror guides feeding a large modern guide hall, in which most of the instruments are placed. Alongside the guide hall, there is good provision of laboratory, office and space for support activities. While the facility has "space" for up to 18 instruments, the project has funding for an initial set of 8 instruments, which will be ready when the reactor is fully operational in July 2006. Instrument performance will be competitive with the best research-reactor facilities anywhere, and our goal is to be in the top 3 such facilities worldwide. Staff to lead the design effort and man these instruments have been hired on the international market from leading overseas facilities, and from within Australia, and 7 out of 8 instruments have been specified and costed. At present the instrumentation project carries 10contingency. An extensive dialogue has taken place with the domestic user community and our international peers, via various means including a series of workshops over the last 2 years covering all 8 instruments, emerging areas of application like biology and the earth sciences, and computing infrastructure for the instruments.

  10. Orthogonal Matching Pursuit with Replacement

    CERN Document Server

    Jain, Prateek; Dhillon, Inderjit S

    2011-01-01

    In this paper, we consider the problem of compressed sensing where the goal is to recover almost all the sparse vectors using a small number of fixed linear measurements. For this problem, we propose a novel partial hard-thresholding operator that leads to a general family of iterative algorithms. While one extreme of the family yields well known hard thresholding algorithms like ITI (Iterative Thresholding with Inversion) and HTP (Hard Thresholding Pursuit), the other end of the spectrum leads to a novel algorithm that we call Orthogonal Matching Pursuit with Replacement (OMPR). OMPR, like the classic greedy algorithm OMP, adds exactly one coordinate to the support at each iteration, based on the correlation with the current residual. However, unlike OMP, OMPR also removes one coordinate from the support. This simple change allows us to prove that OMPR has the best known guarantees for sparse recovery in terms of the Restricted Isometry Property (a condition on the measurement matrix). In contrast, OMP is kn...

  11. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    ‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...... evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system...

  12. Competence Building

    DEFF Research Database (Denmark)

    Borrás, Susana; Edquist, Charles

    The main question that guides this paper is how governments are focusing (and must focus) on competence building (education and training) when designing and implementing innovation policies. With this approach, the paper aims at filling the gap between the existing literature on competences on the...... one hand, and the real world of innovation policy-making on the other, typically not speaking to each other. With this purpose in mind, this paper discusses the role of competences and competence-building in the innovation process from a perspective of innovation systems; it examines how governments...... and public agencies in different countries and different times have actually approached the issue of building, maintaining and using competences in their innovation systems; it examines what are the critical and most important issues at stake from the point of view of innovation policy, looking...

  13. Performance Evaluation of DSC Windows for Buildings

    OpenAIRE

    Jun-Gu Kang; Jin-Hee Kim; Jun-Tae Kim

    2013-01-01

    Interest in BIPV systems with dye-sensitized solar cells (DSCs) that can replace building windows has increased for zero energy buildings. Although DSCs have lower efficiency in terms of electricity generation than silicon solar cells, they allow light transmission and application of various colors; they also have low production costs, which make them especially suitable for BIPV systems. DSC research is interdisciplinary, involving electrical, chemical, material, and metal engineering. A con...

  14. Building Bridges

    DEFF Research Database (Denmark)

    The report Building Bridges adresses the questions why, how and for whom academic audience research has public value, from the different points of view of the four working groups in the COST Action IS0906 Transforming Audiences, Transforming Societies – “New Media Genres, Media Literacy and Trust...... in the Media”, “Audience Interactivity and Participation”, “The Role of Media and ICT Use for Evolving Social Relationships” and “Audience Transformations and Social Integration”. Building Bridges is the result of an ongoing dialogue between the Action and non-academic stakeholders in the field of audience...

  15. Better Buildings Neighborhood Program: BetterBuildings Lowell Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Heslin, Thomas

    2014-01-31

    The City of Lowell set four goals at the beginning of the Better Buildings Neighborhood Program: 1. Improve the Downtown Historic Park District’s Carbon Footprint 2. Develop a sustainable and replicable model for energy efficiency in historic buildings 3. Create and retain jobs 4. Promote multi-stakeholder partnerships The City of Lowell, MA was awarded $5 million in May 2010 to conduct energy efficiency retrofits within the downtown National Historical Park (NHP). The City’s target was to complete retrofits in 200,000 square feet of commercial space and create 280 jobs, while adhering to the strict historical preservation regulations that govern the NHP. The development of a model for energy efficiency in historic buildings was successfully accomplished. BetterBuildings Lowell’s success in energy efficiency in historic buildings was due to the simplicity of the program. We relied strongly on the replacement of antiquated HVAC systems and air sealing and a handful of talented energy auditors and contractors. BetterBuildings Lowell was unique for the Better Buildings Neighborhood Program because it was the only program that focused solely on commercial properties. BetterBuildings Lowell did target multi-family properties, which were reported as commercial, but the majority of the building types and uses were commercial. Property types targeted were restaurants, office buildings, museums, sections of larger buildings, mixed use buildings, and multifamily buildings. This unique fabric of building type and use allows for a deeper understanding to how different properties use energy. Because of the National Historical Park designation of downtown Lowell, being able to implement energy efficiency projects within a highly regulated historical district also provided valuable research and precedent proving energy efficiency projects can be successfully completed in historical districts and historical buildings. Our program was very successful in working with the local

  16. International examples of steam generator replacement

    International Nuclear Information System (INIS)

    Since 1979-1980 a total of twelve nuclear power plants world-wide have had their steam generators replaced. The replacement of the Combustion steam generators in the Millstone-2 plant in the United States was completed very recently. Steam generator replacement activities are going on at present in four plants. In North Anna, the steam generators have been under replacement since January 1990. In Japan, preparations have been started for Genkai-1. Since January 1992, the two projects in Beznau-1, Switzerland, and Doel-3, Belgium, have bee planned and executed in parallel. Why steam generator replacement? There are a number of defect mechanisms which give rise to the need for early steam generator replacement. One of the main reasons is the use of Inconel-600 as material for the heating tubes. Steam generator heating tubes made of Inconel-600 have been known to exhibit their first defects due to stress corrosion cracking after less than one year of operation. (orig.)

  17. Biology of tooth replacement in amniotes

    Institute of Scientific and Technical Information of China (English)

    John A Whitlock; Joy M Richman

    2013-01-01

    Tooth replacement is a common trait to most vertebrates, including mammals. Mammals, however, have lost the capacity for continuous tooth renewal seen in most other vertebrates, and typically have only 1–2 generations of teeth. Here, we review the mechanisms of tooth replacement in reptiles and mammals, and discuss in detail the current and historical theories on control of timing and pattern of tooth replacement and development.

  18. Menopause and hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    Ali Baziad

    2001-12-01

    Full Text Available The global population in the 21st century has reached 6.2 billion people, by the year 2025 it is to be around 8.3-8.5 billion, and will increase further. Elderly people are expected to grow rapidly than other groups. The fastest increase in the elderly population will take place in Asia. Life expectancy is increasing steadily throughout developed and developing countries. For many  menopausal women, increased life expectancy will accompanied by many health problems. The consequences of estrogen deficiency are the menopausal symptoms. The treatment of menopause related complaints and diseases became an  important socioeconomic and medical issue. Long term symptoms, such as the increase in osteoporosis fractures, cardio and cerebrovascular disesses and dementia, created a large financial burden on individuals and society. All these health problems can be lreated or prevented by hormone replacement therapy (HRT. Natural HRT is usually prefened. Synthetic  estrogen in oral contraceptives (oc are not recommended for HRT. Many contra-indications for oc, but now it is widely usedfor HRT. The main reasons for discontinuing HRT are unwanted bleeding, fear of cancer, and negative side effects. Until now there are sill debates about the rebrtonship between HRT and the incidence of breast cancer. Many data showed that there were no clear relationship between the use of HRT and breast cancer. ThereÎore, nwny experts advocate the use of HRTfrom the first sign of climacteric complaints until death. (Med J Indones 2001;10: 242-51Keywords: estrogen deficiency, climacteric phases, tibolone.

  19. Opportunistic replacement of fusion power system parts

    International Nuclear Information System (INIS)

    This paper describes a maintenance problem in a fusion power plant. The problem is to specify which life limited parts should be replaced when there is an opportunity. The objective is to minimize the cost rate of replacement parts and of maintenance actions while satisfying a power plant availability constraint. The maintenance policy is to look ahead and replace all parts that will reach their life limits within a time called a screen. Longer screens yield greater system availabilities because more parts are replaced prior to their life limits

  20. Peach bottom recirculation piping replacement ALARA program

    International Nuclear Information System (INIS)

    In late 1983, Philadelphia Electric Company (PECo) began detailed planning to replace the recirculation, residual heat removal, and part of the reactor water cleanup piping of the Peach Bottom Unit 2 reactor. Included in this work was an estimate of the collective exposure expected during piping replacement. That initial estimate, 1945 man-rem, is compared with the actual collective dose incurred during the piping replacement program. Also included are the exposures incurred during two additional tasks (safe end replacement and recirculation pump disassembly and decontamination) not considered in the initial estimate

  1. Sustainable Buildings

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Elle, Morten

    The scientific community agrees that: all countries must drastically and rapidly reduce their CO2 emissions and that energy efficient houses play a decisive role in this. The general attitude at the workshop on Sustainable Buildings was that we face large and serious climate change problems that...

  2. Capacity Building

    International Nuclear Information System (INIS)

    Outcomes & Recommendations: • Significant increase needed in the nuclear workforce both to replace soon-to-retire current generation and to staff large numbers of new units planned • Key message, was the importance of an integrated approach to workforce development. • IAEA and other International Organisations were asked to continue to work on Knowledge Management, Networks and E&T activities • IAEA requested to conduct Global Survey of HR needs – survey initiated but only 50% of operating countries (30% of capacity) took part, so results inconclusive

  3. ImBuild: Impact of building energy efficiency programs

    Energy Technology Data Exchange (ETDEWEB)

    Scott, M.J.; Hostick, D.J.; Belzer, D.B.

    1998-04-01

    As part of measuring the impact of government programs on improving the energy efficiency of the Nation`s building stock, the Department of Energy Office of Building Technology, State and Community Programs (BTS) is interested in assessing the economic impacts of its portfolio of programs, specifically the potential impact on national employment and income. The special-purpose version of the IMPLAN model used in this study is called ImBuild. In comparison with simple economic multiplier approaches, such as Department of Commerce RIMS 2 system, ImBuild allows for more complete and automated analysis of the economic impacts of energy efficiency investments in buildings. ImBuild is also easier to use than existing macroeconomic simulation models. The authors conducted an analysis of three sample BTS energy programs: the residential generator-absorber heat exchange gas heat pump (GAX heat pump), the low power sulfur lamp (LPSL) in residential and commercial applications, and the Building America program. The GAX heat pump would address the market for the high-efficiency residential combined heating and cooling systems. The LPSL would replace some highly efficient fluorescent commercial lighting. Building America seeks to improve the energy efficiency of new factory-built, modular, manufactured, and small-volume, site-built homes through use of systems engineering concepts and early incorporation of new products and processes, and by increasing the demand for more energy-efficient homes. The authors analyze a scenario for market penetration of each of these technologies devised for BTS programs reported in the BTS GPRA Metrics Estimates, FY99 Budget Request, December 19, 1997. 46 figs., 4 tabs.

  4. Replacement or reuse? The choice between demolition and life cycle extension from a sustainable viewpoint

    NARCIS (Netherlands)

    Thomsen, A.F.; van der Flier, C.L.

    2008-01-01

    What is better: renovation or new construction? Following the plenary debate on the ENHR 2007 conference in Rotterdam we continued our search for the answer to this question. The choice between reuse and replacement of existing buildings is a vital but very difficult one, involving a wide range of a

  5. Five Significant Points of“SHP (Small Hydropower) Replacing Firewood” Ecological Protection Project

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    Developing rural hydropower and enforcing “SHP replacing firewood”ecological protection project are deemed very significant to protect and improve ecological environment,promote socioeconomic development of rural areas and rapidly build a wellbeing society in full swing in China,which can be elaborated in the following five aspects:

  6. Temelin NPP - IandC replacement

    International Nuclear Information System (INIS)

    The original instrumentation and control system of the Temelin nuclear power plant is being upgraded and replaced by a modern Westinghouse-supplied system which meets the requirements imposed on current nuclear power plant designs. The history and purpose of the IandC system replacement is given, and the design of the new system is described in some detail. (A.K.)

  7. Simple random sampling with over-replacement

    OpenAIRE

    Antal, Erika; Tillé, Yves

    2016-01-01

    There are several ways to select units with replacement and an equal inclusion expectation. We present a new sampling design called simple random sampling with over-replacement. Its interest lies in the high variance produced for the Horvitz–Thompson estimator. This characteristic could be useful for resampling methods.

  8. Conservative treatment planning in veneer replacement.

    Science.gov (United States)

    Guzmán-Armstrong, Sandra; Maia, Rodrigo Rocha

    2016-04-01

    This clinical report describes a conservative treatment in veneer replacement where diastemas, malalignment, and midline shift were the main modifying factors. When replacement veneers are indicated, the definitive results can only be accurately predicted after an esthetic reanalysis of the existing restorations. PMID:26602148

  9. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... replacement - a total knee replacement - is a rehab process. And so, to go through a rehab process and still have pain is not necessarily worth ... ll do a femoral nerve block, which helps control pain for about 24 hours or so. These ...

  10. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... replacement. One of the things I had in mind is I'm wondering, you know, one of the classic teachings that we grew up on as surgeons in training is that partial knee replacements don’t work in people with high body mass indexes or people who are overweight. What ...

  11. Mercury Thermometer Replacements in Chemistry Laboratories

    Science.gov (United States)

    Foster, Barbara L.

    2005-01-01

    The consequences of broken mercury-in-glass thermometers in academic laboratories results in various health and environmental hazards, which needs to be replaced, by long-stem digital thermometers and non-mercury glass thermometers. The factors that should be considered during the mercury replacement process are types of applications in the…

  12. Neurotransmitter replacement therapy in Alzheimer's disease.

    OpenAIRE

    Mohr, E; Mendis, T; Rusk, I N; Grimes, J. D.

    1994-01-01

    The relative success of symptomatic attenuation of motor dysfunction in Parkinson's disease with dopaminomimetics has spurred interest in neurotransmitter replacement therapy for treating Alzheimer's disease. While cholinergic dysfunction has been linked to various clinical parameters in Alzheimer's disease, cholinergic replacement, including precursor therapy, administration of direct-acting agonists and inhibition of enzymatic degradation has had only very modest success. The inhibition of ...

  13. Administrative building

    OpenAIRE

    Vokatá, Kateřina

    2015-01-01

    The task of my master´s thesis was to work up a project and a check of a bearing steel construction the multi-storey office building with a garage in Brno. The building is composed of five storey office section and two storey of garage. Ground dimension of administrative part is 38,8m x 35m with distance of pillars 7m,6m and 6,4m. The structural height of floor is 3,5m.Garage is designed with dimensions 36m x 24,8m with structural height of floor 3,5m. Distance of pillars is 5,6m, 6,4m and 7,...

  14. Building economics

    DEFF Research Database (Denmark)

    Pedersen, D.O.(red.)

    Publikationen er på engelsk. Den omfatter alle indlæg på det fjerde internationale symposium om byggeøkonomi, der blev arrangeret af SBI for det internationale byggeforskningsråd CIB. De fem bind omhandler: Methods of Economic Evaluation, Design Optimization, Ressource Utilization, The Building...... Market og Economics and Technological Forecasting in Construction. Et indledende bind bringer statusrapporter for de fem forskningsområder, og det sidste bind sammenfatter debatten på symposiet....

  15. Model Building

    OpenAIRE

    Frampton, Paul H.

    1997-01-01

    In this talk I begin with some general discussion of model building in particle theory, emphasizing the need for motivation and testability. Three illustrative examples are then described. The first is the Left-Right model which provides an explanation for the chirality of quarks and leptons. The second is the 331-model which offers a first step to understanding the three generations of quarks and leptons. Third and last is the SU(15) model which can accommodate the light leptoquarks possibly...

  16. Building Inclusion

    OpenAIRE

    Jeanet Kullberg; Isik Kulu-Glasgow

    2009-01-01

    The social inclusion of immigrants and ethnic minorities is a central issue in many European countries. Governments face challenges in ensuring housing for immigrants, delivering public services, promoting neighbourhood coexistence and addressing residential segregation. The Building Inclusion project, sponsored by the European Commission, enables EU member states to exchange experiences relating to the social inclusion of vulnerable groups. Its special focus is on housing access and housing ...

  17. The menopause and hormone replacement therapy: views of women in general practice receiving hormone replacement therapy.

    OpenAIRE

    Roberts, P J

    1991-01-01

    Women's views on the menopause and hormone replacement therapy were explored using a questionnaire given to women attending one general practice who were having hormone replacement therapy under the supervision of their doctor. Sixty four women (67%) responded. Although only 5% of women had requested hormone replacement therapy from their general practitioner the majority of women indicated that they had been helped by hormone replacement therapy. Eight per cent of women were using hormone re...

  18. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves originates from

  19. Optimal composition of fluid-replacement beverages.

    Science.gov (United States)

    Baker, Lindsay B; Jeukendrup, Asker E

    2014-04-01

    The objective of this article is to provide a review of the fundamental aspects of body fluid balance and the physiological consequences of water imbalances, as well as discuss considerations for the optimal composition of a fluid replacement beverage across a broad range of applications. Early pioneering research involving fluid replacement in persons suffering from diarrheal disease and in military, occupational, and athlete populations incurring exercise- and/or heat-induced sweat losses has provided much of the insight regarding basic principles on beverage palatability, voluntary fluid intake, fluid absorption, and fluid retention. We review this work and also discuss more recent advances in the understanding of fluid replacement as it applies to various populations (military, athletes, occupational, men, women, children, and older adults) and situations (pathophysiological factors, spaceflight, bed rest, long plane flights, heat stress, altitude/cold exposure, and recreational exercise). We discuss how beverage carbohydrate and electrolytes impact fluid replacement. We also discuss nutrients and compounds that are often included in fluid-replacement beverages to augment physiological functions unrelated to hydration, such as the provision of energy. The optimal composition of a fluid-replacement beverage depends upon the source of the fluid loss, whether from sweat, urine, respiration, or diarrhea/vomiting. It is also apparent that the optimal fluid-replacement beverage is one that is customized according to specific physiological needs, environmental conditions, desired benefits, and individual characteristics and taste preferences. PMID:24715561

  20. Redesign: Upgrading the building stock to meet (new) user demands

    OpenAIRE

    Remoy, H.T.; Van der Voordt, D.J.M.

    2011-01-01

    Financial and real estate crises and “new ways of working” reduce the need for office space. As a consequence, office markets become replacement markets without a quantitative need for new office buildings: new buildings drive out bad buildings. In the Netherlands, currently 14% of the office space is vacant, of which 60% is redundant or obsolete. Office users, guided by the government, consider sustainable office space important for their image and status. Besides they want to be accommodate...

  1. Older Person's Guide to Joint Replacement

    Science.gov (United States)

    ... he or she will refer you to an orthopedic surgeon who does hip and knee replacement surgery. ... The Arthritis Foundation Web The American Academy of Orthopedic Surgeons ' The American Association of Knee and Hip ...

  2. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... completely excised and removed. It can be a source of pain in the replaced joint if it ... to our office. And we can get that information to you. Thank you. Good night. Thank you ...

  3. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... Don't you think that doing a certain number of these a year is kind of important ... t happen as it can happen in small numbers of total knee replacement patients. And do you ...

  4. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... through Partial Knee Replacement NewYork-Presbyterian New York City, New York May 4, 2010 I've always ... out every single day. Located in New York City, New York Presbyterian is ranked among the top ...

  5. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... cementation, which, as Dr. McCauley mentioned before, basically acts as a gout to hold the components into ... training is that partial knee replacements don’t work in people with high body mass indexes or ...

  6. Artificial Cervical Disc Replacement Improves Mobility

    Medline Plus

    Full Text Available ... a total disc replacement arthroplasty on a young patient who has a herniated disc in her neck. ... way in, it’s, you know, I find that patients have very little pain after surgery. And just ...

  7. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... old woman who I'm sure in your practice is on the extremely young side for perhaps ... full knee replacement. Now Dr. McCauley, in your practice have you seen many people that have had ...

  8. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... all practice components. Now how important is this stage, Dr. McCauley, during the knee replacement? Well, it's ... m wondering, you know, one of the classic teachings that we grew up on as surgeons in ...

  9. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... is gone through the skin and we're working our way down to the knee joint capsule ... that medial partial knee replacements don't really work. So they come in with the idea that ...

  10. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... is what you see on the left, which has a good full healthy layer of articular cartilage ... bone showing that only part of the knee has been replaced, whereas the rest of the knee ...

  11. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... the knee has become more deformed, there's more limited range of motion. And when somebody has damaged ... replacement in general, right? Yeah, that's right on, Bill. So the kneecap, you will see, is just ...

  12. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... itself. And again, this is when only one part of the knee, what we call a compartment ... prosthesis secured to the bone showing that only part of the knee has been replaced, whereas the ...

  13. Total Hip Replacement (Arthroplasty) (Beyond the Basics)

    Science.gov (United States)

    ... stiffening caused by extra bone formation, also called heterotopic ossification, is a process in which some soft ... replacement (prosthetic) parts, with the goal of relieving pain and improving function. ● Most patients require total hip ...

  14. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... hospitals in America by "US News and World Report." New York Presbyterian is affiliated with two Ivy ... that we grew up on as surgeons in training is that partial knee replacements don’t work ...

  15. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  16. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... remove a little bit of excess cement that creeps out. Generally, we remove this to make sure ... come into the office who ask about different types of partial knee replacements? Are there any other ...

  17. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... it's the rehab, as you know, is pretty standard. Almost all the physical therapists out there have ... metal to help reduce friction. And that's pretty standard with just about any knee replacement system that ...

  18. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... that medial partial knee replacements don't really work. So they come in with the idea that ... would expect, on average, those to continue to work for another 10 to 15 years. So, just ...

  19. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... about partial knee replacement due to her young age. Specifically with her symptoms, she was unable to ... them that if I had this procedure at age 42, I probably would not use it to ...

  20. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... at about one month and three-month time intervals, as you know, because I think you do ... that we grew up on as surgeons in training is that partial knee replacements don’t work ...

  1. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... affiliated with two Ivy League medical schools: Columbia University College of Physicians and Surgeons, and Wilde Cornell ... Knee Replacement at New York Presbyterian Hospital, Columbia University. Today we're going to be discussing several ...

  2. Nuclear facilities: repair and replacement technologies

    International Nuclear Information System (INIS)

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  3. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... to introduce our patient. We're going to go into the definition of arthritis. We're going ... a full knee replacement. We are going to go through a surgical video of a partial knee ...

  4. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... soon. What's your rationale for that? In this system, the way the guides are for the distal ... pretty standard with just about any knee replacement system that you use. At this point what I ...

  5. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... replacing. This is an artist's rendition of the prosthesis secured to the bone showing that only part ... is the bone cement, which helps secure the prosthesis into place. The real prosthesis is being tamped ...

  6. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... are interested in this, or physicians who are thinking about referring their patients to this kind of ... McCauley, during the knee replacement? Well, it's definitely critical because, as you mentioned before, you've made ...

  7. Artificial Cervical Disc Replacement Improves Mobility

    Science.gov (United States)

    Artificial Cervical Disc Replacement Improves Mobility February 18, 2009 From PinnacleHealth, Harrisburg, PA Welcome to this “OR ... this new technology with the use of an artificial disc has some significant benefits over the previous ...

  8. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... felt that the mission of helping somebody with healthcare when they're in trouble is as wonderful, ... about partial knee replacement due to her young age. Specifically with her symptoms, she was unable to ...

  9. Postoperative Autologous Reinfusion in Total Knee Replacement

    OpenAIRE

    A. Crescibene; Martire, F.; Gigliotti, P.; Rende, A.; Candela, M

    2015-01-01

    Surgeries for total knee replacement (TKR) are increasing and in this context there is a need to develop new protocols for management and use of blood transfusion therapy. Autologous blood reduces the need for allogeneic blood transfusion and the aim of the present study was to verify the safety and the clinical efficacy. An observational retrospective study has been conducted on 124 patients, undergoing cemented total knee prosthesis replacement. Observed population was stratified into two g...

  10. Aluminium-based Coatings for Cadmium Replacement

    OpenAIRE

    Cardilli , Emanuele

    2008-01-01

    Cadmium electroplating is widely used in the aerospace industry for the corrosion protection of high strength steels. Cadmium is also used as compatible coating to reduce the galvanic corrosion generated in the assembly of components manufactured with different materials. However, environmental and safety concerns over the high toxicity of cadmium has led to the investigation of suitable replacements. Aluminium coatings are promising coatings for the replacement of electropl...

  11. Device for a replaceable sealed electron tube

    International Nuclear Information System (INIS)

    A patent is claimed for the invention of a replaceable sealed electron tube. The invention is to be applied in the field of the neutronography. The device consists of an electron tube containing permanent structures and elements that wear out and must be changed. In the proposed system, the gas containers and the elements to be replaced are put together in other to facilitate maintenance. The design, the characteristics and the operation of the invention are described

  12. Severe Heterotopic Ossification following Total Knee Replacement

    OpenAIRE

    Dodds, Alexander L.; Keene, Gregory C. R.

    2014-01-01

    Although the incidence of minor heterotopic ossification is probably higher than what is usually expected, severe heterotopic ossification (HO) is an extremely rare event following total knee replacement surgery. We present the case of a 66-year-old woman who initially had achieved an excellent range of motion following bilateral uncemented rotating platform total knee replacement, before presenting with pain and loss of range of motion at 2 months after surgery. Severe HO was diagnosed on X-...

  13. Activ C cervical disc replacement for myelopathy

    Directory of Open Access Journals (Sweden)

    L McGonagle

    2011-01-01

    Full Text Available Background: Cervical disc replacement is becoming an increasingly popular treatment option for cervical myelopathy. It retains motion at the affected segment, unlike anterior cervical discectomy and fusion. The aim of this study is to assess the outcomes of a series of patients who underwent Activ C disc replacement for cervical myelopathy. Materials and Methods: A series of patients at the above Trust with clinical and radiological evidence of cervical myelopathy who were suitable for cervical disc replacement from 2007 to 2009 were included. Implants were inserted by one of two consultant surgeons {IMS, MO′M}. Patients were assessed preoperatively and at six, 12 and 24 months, postoperatively, with a visual analogue score (VAS for neck and arm pain severity and frequency, the Neck Disability Index questionnaire (NDI and the Centre for Epidemiologic Studies Depression questionnaire (CES-D. Results: Ten patients underwent surgery between May 2007 and July 2009, 6 women, and 4 men. Average age was 54 years (40-64. Disc levels replaced were: four at C4-5; eight at C5-6; seven at C6-7. Three patients had one disc replaced, five patients had two discs replaced, and two patients had three discs replaced. The VAS for neck pain improved from 5.9 pre-operatively to 1.4-24 months postoperatively and the VAS arm pain improved from 5.4 to 2.6. The NDI improved from 51% preoperatively to 26.8% at 24 months postoperatively. The CES-D showed a slight increase from 19.5 preoperatively to 21.7 at 24 months, postoperatively. Conclusion: Cervical decompression and disc replacement improves pain and function in patients with cervical myelopathy. This benefit is maintained at 24 months post op, with no cases requiring revision.

  14. Infective endocarditis following percutaneous pulmonary valve replacement

    DEFF Research Database (Denmark)

    Cheung, Gary; Vejlstrup, Niels; Ihlemann, Nikolaj;

    2013-01-01

    Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult.......Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult....

  15. [Osteoporosis in men and androgen replacement therapy].

    Science.gov (United States)

    Tsujimura, Akira; Okuyama, Akihiko

    2003-11-01

    Androgen plays an important role in bone maturation and maintenance of bone mass. Androgen deficiency associated with aging causes osteoporosis for men. With respect to this disease, androgen replacement treatment has been performed for aging male. However, available preparations of androgen are limited in Japan and each of them has both merit and demerit. Establishment of guideline for androgen replacement treatment including criteria of serum testosterone concentration is the problem, which now confronts us. PMID:15775234

  16. Aortic valve replacement through right thoracotomy.

    OpenAIRE

    Rao, P N; A S Kumar

    1993-01-01

    There has never, to our knowledge, been a report of aortic valve replacement via a right thoracotomy. However, we recently used this approach in 2 young women with severe aortic stenosis. Exposure of the aortic valve was excellent, and we encountered neither technical difficulties nor sequelae related to the right thoracotomy. We believe that right thoracotomy provides adequate access for safe aortic valve replacement and yields cosmetically more appealing results than does median sternotomy.

  17. Annual report for Ion Replacement Program

    International Nuclear Information System (INIS)

    Ion replacement electrorefining is an innovative electrochemical approach to purifying and separating metals. This approach overcomes the shortcomings of conventional electrorefining and has the potential for processing a wider range of metals and metal halide salts. Salt waste is also minimized with this approach. The key element of ion replacement electrorefining is the ion replacement electrode. This electrode allows a decoupling of the electrotransport process into two separate steps, anodic dissolution and cathodic deposition. Three key accomplishments described in this report that demonstrate the feasibility of ion replacement electrorefining are: (1) we have identified a suitable sodium/β double-prime-alumina/molten salt electrolyte system that functions reproducibly at 723 K, (2) we have oxidized and deposited dysprosium, lanthanum, uranium, and titanium by using a sodium ion replacement electrode. In several experiments, an actual separation of dysprosium and lanthanum was observed, and (3) we have identified a metal alloy, LixSb, as an alternative ion replacement electrode. The next stage in the program is the design, construction, and testing of a laboratory-scale electrorefiner. Follow-on development with funding from industrial and federal sponsors is being pursued

  18. A replaceable reflective film for solar concentrators

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  19. Existing buildings

    DEFF Research Database (Denmark)

    Gram-Hanssen, Kirsten

    2014-01-01

    their homes. These policy measures include building regulations, energy tax and different types of incentives and information dissemination. The conclusion calls for new and innovative policy measures to cope with the realities of renovations of owner-occupied houses and how energy efficiency......This paper deals with the energy consumption of existing owner-occupied detached houses and the question of how they can be energy renovated. Data on the age of the Danish housing stock, and its energy consumption is presented. Research on the potential for energy reductions in the Danish housing...... sector is discussed, and it is shown that there is a huge potential for reductions. It is a well-known problem that even if there are relevant technical means and even if it is economically feasible, the majority of house owners do not energy renovate their homes. This paper intends to address what can...

  20. Building with Nature (Ecological Principles in Building Design

    Directory of Open Access Journals (Sweden)

    Akubue Jideofor Anselm

    2006-01-01

    Full Text Available The main objective here is to confer ideas aimed at creating environmentally friendly, energy efficient buildings, developed by effectively managing natural resources. This entails passively and actively harnessing solar energy and using materials which, in their manufacture, application and disposal, do the least possible damage to nature`s `free resources`; water, ground and air. This study provides ideas on the effective management of nature in building design and the process of integration with nature. Such ideas as ecological replacement scheme or ecology integration using traditional concepts of natural landform integration, natural orientation and effective methods of harnessing the climatic resources like the sun and winds and a breakdown on the modes of building material selection and application to suit geographical and climatic conditions are among the issues discussed in this study. The major emphasis here is to utilize these natural resources integrated effectively in design and building in order to achieve sustainability, energy efficiency and most importantly an ecological and healthy living environment devoid of waste and with minimized environmental pollution.

  1. Integrating Responsive Building Elements in Buildings

    DEFF Research Database (Denmark)

    Haase, Matthias; Amato, Alex; Heiselberg, Per

    2006-01-01

    There is a global need for a more sustainable building development. About 50% of energy is used in buildings indicating that buildings provide a considerable potential for operational energy savings. Studies were conducted with the following objectives: to perform a state-of-the-art review of...... responsive building elements, of integrated building concepts and of environmental performance assessment methods to improve and optimize responsive building elements to develop and optimize new building concepts with integration of responsive building elements, HVAC-systems as well as natural and renewable...... energy strategies to develop guidelines and procedures for estimation of environmental performance of responsive building elements and integrated building concepts This paper introduces the ideas of this collaborative work and discusses its usefulness for Hong Kong and China. Special focus was put on the...

  2. Application of Shuttle Remote Manipulator System technology to the replacement of fuel channels in the Pickering CANDU reactor

    International Nuclear Information System (INIS)

    Spar Aerospace Limited of Toronto was the prime contractor to the National Research Council of Canada for the design and development of the Shuttle Remote Manipulator (SRMS). Spar is presently under contract to Ontario Hydro to design and build a Remote Manipulation Control System to replace the fuel channels in the Pickering A Nuclear Generating Station. The equipment may be used to replace the fuel channels in six other early generation CANDU reactors

  3. Feeder elbow replacement at Pickering A

    International Nuclear Information System (INIS)

    Flow accelerated corrosion, resulting in localized wall reduction, has been identified as the main cause of outlet elbow thinning in CANDU reactors. Pickering A has completed wall thickness measurements of feeder elbows in 2001/2002 as part of the Return to Service (RTS) commitment to the regulator and identified several feeders for replacement as the wall thickness would not meet the planned operating life criterion after RTS. In Pickering A, the pipe sizes have non-standard dimensions relative to commercially available nuclear grade schedule 80 pipe sizes. As the original pipe size is no longer available, the replacement program needs to address the following issues: 1) thermal hydraulic effect due to change in flow area, 2) stress distribution due to pipe size differences, 3) weld joint preparation, 4) pipe to pipe fit up, 5) welding procedure to account for pipe size mismatch. The replacement project was completed under the Very Low Level Drain State, possible due to Pickering A having been in the lay-up state for a few years with low decay heat in the reactor core. This condition has facilitated the field execution phase, as many restrictions (normally in a regular outage) were not applicable. Some of the advantages included parallel work on two open channels and elimination of feeder freezing. Commercially available tooling was also available as there were sufficient clearances between feeders. The replacement process included dimensional measurements at the reactor face, feeder specific computer simulation of the replacement, fabrication of replacement assembly (including hub/elbow/schedule 80 pipe), Grayloc disconnect, comparison between in-reactor pipe section and pre-fabricated assembly, field welding and final Grayloc connection. This paper describes the preparation and field work to replace four feeders at Pickering A Unit 1 which was completed in January 2005. (author)

  4. Neutron beam facilities at the Australian Replacement Research Reactor

    International Nuclear Information System (INIS)

    Australia is building a research reactor to replace the HIFAR reactor at Lucas Heights by the end of 2005. Like HIFAR, the Replacement Research Reactor will be multipurpose with capabilities for both neutron beam research and radioisotope production. It will be a pool-type reactor with thermal neutron flux (unperturbed) of 4 x 1014 n/cm2/sec and a liquid D2 cold neutron source. Cold and thermal neutron beams for neutron beam research will be provided at the reactor face and in a large neutron guide hall. Supermirror neutron guides will transport cold and thermal neutrons to the guide hall. The reactor and the associated infrastructure, with the exception of the neutron beam instruments, is to be built by INVAP S.E. under contract. The neutron beam instruments will be developed by ANSTO, in consultation with the Australian user community. This status report includes a review the planned scientific capabilities, a description of the facility and a summary of progress to date. (author)

  5. Partial Replacement of Cement with Marble Dust Powder

    Directory of Open Access Journals (Sweden)

    Mr. Ranjan Kumar

    2015-08-01

    Full Text Available The waste generated from the industries cause environmental problems. Hence the reuse of this waste material can be emphasized. MarbleDust Powder (MDP is a developing composite materialthatwillallow the concrèteindustry to optimisemateriel use, generateeconomicbenefits and build structures thatwillstrong, durable and sensitive to environnement. MDP is by-product obtained during the quarrying process from the parent marble rock; which contains high calcium oxide content of more than 50%. The potential use of MDP can be an ideal choice for substituting in a cementitious binder as the reactivity efficiency increases due to the presence of lime. In this research work, the waste MDP passing through 90 microns,has used for investigating of hardened concrete properties. Furthermore, the effect of different percentage replacement of MDP on the compressive strength, splitting tensile strength (indirect tensile strength&flexural strength has been observed. Inthis experimental study, the effect of MDP in concrete on strength ispresented. Five concrete mixtures containing 0%, 5%, 10%, and 20% MDP as cement replacement by weightbasis has been prepared. Water/cement ratio (0.43 was kept constant, in all the concretemixes. Compressive strength, split tensile strength & flexural strength of the concrete mixtures has been obtainedat 7 and 28 days. The results of the laboratory work showed thatreplacement of cement with MDP increase, upto 10% for compressive strength,&upto 15% for split tensilestrength &flexural strength of concrete.

  6. Building energy analysis tool

    Science.gov (United States)

    Brackney, Larry; Parker, Andrew; Long, Nicholas; Metzger, Ian; Dean, Jesse; Lisell, Lars

    2016-04-12

    A building energy analysis system includes a building component library configured to store a plurality of building components, a modeling tool configured to access the building component library and create a building model of a building under analysis using building spatial data and using selected building components of the plurality of building components stored in the building component library, a building analysis engine configured to operate the building model and generate a baseline energy model of the building under analysis and further configured to apply one or more energy conservation measures to the baseline energy model in order to generate one or more corresponding optimized energy models, and a recommendation tool configured to assess the one or more optimized energy models against the baseline energy model and generate recommendations for substitute building components or modifications.

  7. Cardiac adverse effects of nicotine replacement therapy.

    Science.gov (United States)

    2015-12-01

    Smoking markedly increases the risk of cardiovascular disease. Nicotine replacement therapy is available to assist in smoking cessation. To assess the cardiac adverse effects of nicotine replacement therapy, we conducted a review of the literature using the standard Prescrire methodology. A meta-analysis of 21 randomised, placebo-controlled trials published in early 2014 included a total of 11 647 patients, including 828 patients at high risk of cardiovascular events and 187 patients with acute coronary disorders. It showed that nicotine replacement therapy was associated with an increased risk of cardiac disorders, particularly palpitations, which are a known adverse effect of smoking. Among patients at high cardiovascular risk, 1.2% experienced a serious cardiovascular event, with no statistically significant difference versus placebo. Bupropion and varenicline both have serious adverse effects and have been less extensively evaluated in patients at high cardiovascular risk. In practice, when a drug is needed to assist in smoking cessation, nicotine appears to be a reasonable choice. Nicotine replacement therapy exposes patients to a risk of palpitations but rarely to serious cardiac disorders, even in individuals with a cardiovascular history. In addition, these adverse effects are better documented than those of bupropion and varenidine in such patients. Nonetheless, the cardiac effects of nicotine call for prudent use of nicotine replacement therapy: the minimum effective dose should be sought, and the goal should be total nicotine withdrawal. PMID:26788573

  8. Analog to digital control system replacement projects

    International Nuclear Information System (INIS)

    Problem Statement: Numerous Control Systems within Operating Nuclear Units are nearing or at the end of their useful life. These systems are typically Analog in design, installed and commissioned during original construction dates. Problems associated with these aging system which are plaging Nuclear Operators are Obsolescence, Inadequate Spares, Complexity in Troubleshooting large hardwired systems, Eroding Experience and Device Failures leading to safety and economic impacts. There are a number of factors to consider when attempting to justify a complete system replacement versus a component by component replacement. This presentation will look at some of these systems which have been chosen for replacement and discuss the rationale used to drive this digital upgrade decision. Specific project related concerns due to the digital technology such as Software Qualification shall be addressed. Also specific to hybrid main control rooms is the Human Factors requirements when replacing analog controllers and meters with Touch Screen based HMI. One aspect of the Nuclear Power Plants which traditionally differs from other industry is the requirement for Full Scope Simulator for training purposes. This presention will identify the importance of the full scope simulator and the role it plays in digital system replacements. Other topics to be discussed in proposed presentation include: - Probablistic Risk Assessment; - Stakeholder Involvement; - New Technology Benefits; - New Technology 'Traps'; - Security; - Phased Acceptance Testing. The proposed presentation shall be in a PowerPoint format

  9. Wynkoop Building Performance Measurement: Water

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, Kimberly M.; Kora, Angela R.

    2012-08-26

    -flush toilet handles was reversed. The building management retrofitted the building's toilets with handles that operated on reduced flush when pushed down (0.8 gallons) and full flush when pulled up (1.1 gallons). The water pressure on the 5th floor (< 30 psi) is less than half the pressure on the 7th floor (>80 psi). The measured water savings post-retrofit was lower on the 5th floor than the 7th floor. The differences in water pressure may have had an impact on the quantity of water used per floor. The second floor water use was examined prior to and following the toilet fixture retrofit. This floor is where conference rooms for non-building occupants are available for use, thus occupancy is highly variable. The 3-day average volume per flush event was higher post-retrofit (0.79 gallons per event), in contrast to pre-retrofit (0.57 gallons per event). There were 40% more flush events post retrofit, which impacted the findings. Water use in the third floor fitness center was also measured for a limited number of days. Because of water line accessibility, only water use on the men's side of the fitness center was measured and from that the total fitness center water use was estimated. Using the limited data collected, the fitness center shower water use is approximately 2% of the whole building water use. Overall water use in the Wynkoop Building is below the industry baseline and GSA expectations. The dual flush fixture replacement appears to have resulted in additional water savings that are expected to show a savings in the total annual water use.

  10. Building America

    Energy Technology Data Exchange (ETDEWEB)

    Brad Oberg

    2010-12-31

    Builders generally use a 'spec and purchase' business management system (BMS) when implementing energy efficiency. A BMS is the overall operational and organizational systems and strategies that a builder uses to set up and run its company. This type of BMS treats building performance as a simple technology swap (e.g. a tank water heater to a tankless water heater) and typically compartmentalizes energy efficiency within one or two groups in the organization (e.g. purchasing and construction). While certain tools, such as details, checklists, and scopes of work, can assist builders in managing the quality of the construction of higher performance homes, they do nothing to address the underlying operational strategies and issues related to change management that builders face when they make high performance homes a core part of their mission. To achieve the systems integration necessary for attaining 40% + levels of energy efficiency, while capturing the cost tradeoffs, builders must use a 'systems approach' BMS, rather than a 'spec and purchase' BMS. The following attributes are inherent in a systems approach BMS; they are also generally seen in quality management systems (QMS), such as the National Housing Quality Certification program: Cultural and corporate alignment, Clear intent for quality and performance, Increased collaboration across internal and external teams, Better communication practices and systems, Disciplined approach to quality control, Measurement and verification of performance, Continuous feedback and improvement, and Whole house integrated design and specification.

  11. Hip or knee replacement - after - what to ask your doctor

    Science.gov (United States)

    ... Below are some questions you may want to ask your health care provider to help you take ... What to ask your doctor after hip or knee replacement; Hip replacement - after - what to ask your doctor; Knee replacement - after - ...

  12. Nonoperative replacement of a jejunostomy feeding catheter.

    Science.gov (United States)

    Stogdill, B J; Page, C P; Pestana, C

    1984-02-01

    Nonoperative replacement of lost or occluded jejunal feeding catheters proved successful in 8 of 11 patients. This technique is recommended as a nonoperative means of replacing a needle catheter jejunostomy when it is accidentally lost or becomes occluded. Adherence to sterile technique and gentle advancement of the guide wire to avoid injury to the bowel are important. Since the technique depends on an established tract between the skin and the bowel, catheter replacement should not be attempted when the feeding catheter is lost or becomes occluded in the immediate postoperative period. In addition, confirmation of catheter patency and intraluminal position with sterile water-soluble contrast medium is critical to the safe use of this technique. PMID:6421183

  13. Severe Heterotopic Ossification following Total Knee Replacement

    Directory of Open Access Journals (Sweden)

    Alexander L. Dodds

    2014-01-01

    Full Text Available Although the incidence of minor heterotopic ossification is probably higher than what is usually expected, severe heterotopic ossification (HO is an extremely rare event following total knee replacement surgery. We present the case of a 66-year-old woman who initially had achieved an excellent range of motion following bilateral uncemented rotating platform total knee replacement, before presenting with pain and loss of range of motion at 2 months after surgery. Severe HO was diagnosed on X-rays. Treatment consisted of nonoperative measures only, including physiotherapy with hydrotherapy and anti-inflammatories. She eventually regained her range of motion when seen at 8 months after operation. This case illustrates that nonoperative treatment without the use of radiotherapy or surgery can be used to safely resolve stiffness caused by HO after total knee replacement.

  14. Immunoglobulin replacement therapy in secondary hypogammaglobulinemia

    Directory of Open Access Journals (Sweden)

    Nicolò eCompagno

    2014-12-01

    Full Text Available Immunoglobulin (Ig replacement therapy dramatically changed the clinical course of primary hypogammaglobulinemias, significantly reducing the incidence of infectious events. Over the last 2 decades its use has been extended to secondary antibody deficiencies, particularly those related to hematological disorders as lymphoproliferative diseases (LPDs and multiple myeloma. In these malignancies, hypogammaglobulinemia can be an intrinsic aspect of the disease or follow chemo-immunotherapy regimens, including anti-CD20 treatment. Other than in LPDs the broadening use of immunotherapy (e.g. rituximab and immune suppressive therapy (steroids, sulfasalazine, mycophenolate mophetil has extended the occurrence of iatrogenic hypogammaglobulinemia. In particular, in both autoimmune diseases and solid organ transplantation Ig replacement therapy has been shown to reduce the rate of infectious events.Here, we review the existing literature about Ig replacement therapy in secondary hypogammaglobulinemia, with special regard for subcutaneous administration route, a safe, effective and well-tolerated treatment approach, currently well established in primary immunodeficiencies and secondary hypogammaglobulinemias.

  15. Rapid prototyping of ossicular replacement prostheses

    Science.gov (United States)

    Ovsianikov, A.; Chichkov, B.; Adunka, O.; Pillsbury, H.; Doraiswamy, A.; Narayan, R. J.

    2007-05-01

    Materials used in ossicular replacement prostheses must demonstrate appropriate biological compatibility, acoustic transmission, stability, and stiffness properties. Prostheses prepared using Teflon ®, titanium, Ceravital and other conventional materials have demonstrated several problems, including migration, perforation of the tympanic membrane, difficulty in shaping the prostheses, and reactivity with the surrounding tissues. We have used two-photon polymerization for rapid prototyping of Ormocer ® middle-ear bone replacement prostheses. Ormocer ® surfaces fabricated using two-photon polymerization exhibited acceptable cell viability and cell growth profiles. The Ormocer ® prosthesis was able to be inserted and removed from the site of use in the frozen human head without fracture. Our results demonstrate that two-photon polymerization is able to create ossicular replacement prostheses and other medical devices with a larger range of sizes, shapes and materials than other microfabrication techniques.

  16. Immunoglobulin Replacement Therapy in Secondary Hypogammaglobulinemia

    Science.gov (United States)

    Compagno, Nicolò; Malipiero, Giacomo; Cinetto, Francesco; Agostini, Carlo

    2014-01-01

    Immunoglobulin (Ig) replacement therapy dramatically changed the clinical course of primary hypogammaglobulinemias, significantly reducing the incidence of infectious events. Over the last two decades its use has been extended to secondary antibody deficiencies, particularly those related to hematological disorders as lymphoproliferative diseases (LPDs) and multiple myeloma. In these malignancies, hypogammaglobulinemia can be an intrinsic aspect of the disease or follow chemo-immunotherapy regimens, including anti-CD20 treatment. Other than in LPDs the broadening use of immunotherapy (e.g., rituximab) and immune-suppressive therapy (steroids, sulfasalazine, and mycophenolate mofetil) has extended the occurrence of iatrogenic hypogammaglobulinemia. In particular, in both autoimmune diseases and solid organ transplantation Ig replacement therapy has been shown to reduce the rate of infectious events. Here, we review the existing literature about Ig replacement therapy in secondary hypogammaglobulinemia, with special regard for subcutaneous administration route, a safe, effective, and well-tolerated treatment approach, currently well established in primary immunodeficiencies and secondary hypogammaglobulinemias. PMID:25538710

  17. Evaluating commercial-grade replacement items

    International Nuclear Information System (INIS)

    A nuclear power plant uses thousands of replacement items during its lifetime. When many suppliers abandoned their quality assurance programs during the plant construction slowdown of the early 1980s, an EPRI-sponsored utility group called NCIG developed guidelines to help utilities evaluate replacement items themselves. However, the need became clear for greater collaboration. Thus EPRI established the Joint Utility Task Group (JUTG) to pool utilities' resources and develop criteria for dedicating commercial-grade items for safety-related nuclear applications. So far, the JUTG has developed a generic evaluation process and completed technical evaluations of 56 replacement items. The resulting information is available in an on-line database through EPRINET

  18. OPTIMAL MAINTENANCE AND REPLACEMENT OF EXTRACTION MACHINERY

    Institute of Scientific and Technical Information of China (English)

    Suresh P.SETHI; Hong-Mo YEH; Rong ZHANG; Andrew K.S.JARDINE

    2008-01-01

    This paper considers a problem of optimal preventive maintenance and replacement schedule ofequipment devoted to extracting resources from known deposits. Typical examples are oil drills, mine shovels, etc. At most one replacement of the existing machinery by a new one is allowed. The problem is formulated as an optimal control problem subject to the state constraint that the remaining deposit at any given time is nonnegative. We show that the optimal preventive maintenance, production rates, and the replacement and salvage times of the existing machinery and the new one, if required, can be obtained by solving sequentially a series of free-end-point optimal control problems. Moreover, an algorithm based on this result is developed and used to solve two illustrative examples.

  19. Three Steam Generator Replacement Projects in 1995

    International Nuclear Information System (INIS)

    Since the companies Siemens AG and Framatome S. A. joined their experience and efforts in the field of steam generator replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 1. Further projects will follow in 1996, i. e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  20. Postmenopausal hormone replacement therapy--clinical implications

    DEFF Research Database (Denmark)

    Ravn, S H; Rosenberg, J; Bostofte, E

    1994-01-01

    The menopause is defined as cessation of menstruation, ending the fertile period. The hormonal changes are a decrease in progesterone level, followed by a marked decrease in estrogen production. Symptoms associated with these hormonal changes may advocate for hormonal replacement therapy. This...... review is based on the English-language literature on the effect of estrogen therapy and estrogen plus progestin therapy on postmenopausal women. The advantages of hormone replacement therapy are regulation of dysfunctional uterine bleeding, relief of hot flushes, and prevention of atrophic changes in...... the urogenital tract. Women at risk of osteoporosis will benefit from hormone replacement therapy. The treatment should start as soon after menopause as possible and it is possible that it should be maintained for life. The treatment may be supplemented with extra calcium intake, vitamin D, and maybe...

  1. Adaptive Replacement Strategies for MOEA/D.

    Science.gov (United States)

    Wang, Zhenkun; Zhang, Qingfu; Zhou, Aimin; Gong, Maoguo; Jiao, Licheng

    2016-02-01

    Multiobjective evolutionary algorithms based on decomposition (MOEA/D) decompose a multiobjective optimization problem into a set of simple optimization subproblems and solve them in a collaborative manner. A replacement scheme, which assigns a new solution to a subproblem, plays a key role in balancing diversity and convergence in MOEA/D. This paper proposes a global replacement scheme which assigns a new solution to its most suitable subproblems. We demonstrate that the replacement neighborhood size is critical for population diversity and convergence, and develop an approach for adjusting this size dynamically. A steady-state algorithm and a generational one with this approach have been designed and experimentally studied. The experimental results on a number of test problems have shown that the proposed algorithms have some advantages. PMID:25826813

  2. Valve assembly having remotely replaceable bearings

    Science.gov (United States)

    Johnson, Evan R.; Tanner, David E.

    1980-01-01

    A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings.

  3. Building trust

    International Nuclear Information System (INIS)

    'Activate' is the energy magazine for secondary schools and is part of the Education Programme which is managed on behalf of the British Nuclear Industry Forum by AEA Technology. activate is the flagship communication device between the British Nuclear Industry Forum's Education Programme and secondary schools in the UK. It was developed from a previous publication, Nuclear Bulletin. There is a need for the nuclear industry to build trust with teachers and students in the UK, where for a long time, everything that the industry has said, written or printed has been disregarded by school teachers as propaganda. Over the last few years the industry has put in a great deal of effort to position itself as a provider of educationally sound and socially acceptable information. 'Activate' was an evolution of this idea and there was a hole in the market for a lively, activity and article based magazine that could be used in the classroom. The target audience is principally teachers of science, mathematics and geography, but also includes teachers of art,, English and history with students of between 11 and 18. The results were very positive in that teachers appreciated the colourful and lively nature of activate and they felt that it provided information and opinions in an un biased and non-propagandist way. Their comments about layout, number of activities style of presentation were taken into account and during the summer of 1994 activate was remodelled ready for re launch in September. The feedback so far is good with more teachers signing up every week to receive their own free copy

  4. Electronic building component catalogue; Realisierung elektronischer Bauteilkatalog

    Energy Technology Data Exchange (ETDEWEB)

    Paolantonio, M. Di

    2007-01-15

    This final report for the Swiss Federal Office of Energy (SFOE) describes an electronic building component catalogue developed to replace earlier printed documentation issued by the Swiss Association of Engineers and Architects SIA. The catalogue, which is available on the Internet, is described and discussed. The paper describes the web site and its features that can be used for the selection of building components such as, for example, double-wall masonry. Here, the thickness of the brickwork and insulation layers can dynamically be selected in order to achieve the insulation properties required. Ecological factors are also dealt with and the XML interface provided for the electronic export of data is described.

  5. A (very short) introduction to buildings

    OpenAIRE

    Everitt, Brent

    2012-01-01

    These lectures are an informal elementary introduction to buildings. They are written for, and by, a non-expert. The aim is to get to the definition of a building and feel that it is an entirely natural thing. To maintain the lecture style examples have replaced proofs. The notes at the end indicate where these proofs can be found. Most of what we say has its origins in the work of Jacques Tits, and our account borrows heavily from the books of Abramenko and Brown and of Ronan. Lecture 1 illu...

  6. What drives replacement goods at the micro level? What Drives Replacement Goods at the Micro Level?

    Directory of Open Access Journals (Sweden)

    Viviana Fernández

    2001-03-01

    Full Text Available Technological innovations have contributed over the years to an increasing stock of durable goods -those products that are not immediately consumed but provide a stream of services over a long period of time. Indeed, virtually every household in a modern economy owns a refrigerator, a personal computer and an automobile. Given the inter-temporal nature of replacement decisions, the existing literature has resorted to the technique of dynamic programming, and most recently to the theory of stochastic processes. This article focuses on micro replacement decisions. We survey some representative models of the recent literature, and discuss their empirical testability. In addition, we study replacement of home appliances in the United States, and construct a test statistic that leads to conclude that replacement decisions might be correlated across appliances. Finally, we enrich our analysis by developing a theoretical model in which replacement decisions are interdependent. Technological innovations have contributed over the years to an increasing stock of durable goods -those products that are not immediately consumed but provide a stream of services over a long period of time. Indeed, virtually every household in a modern economy owns a refrigerator, a personal computer and an automobile. Given the inter-temporal nature of replacement decisions, the existing literature has resorted to the technique of dynamic programming, and most recently to the theory of stochastic processes. This article focuses on micro replacement decisions. We survey some representative models of the recent literature, and discuss their empirical testability. In addition, we study replacement of home appliances in the United States, and construct a test statistic that leads to conclude that replacement decisions might be correlated across appliances. Finally, we enrich our analysis by developing a theoretical model in which replacement decisions are interdependent.

  7. A Study to Compare the Cost of Operation and Maintenance in Green Building Index (GBI and Non-Green Building Index (Non-GBI Rated Building in Malaysia

    Directory of Open Access Journals (Sweden)

    Ping Lee Zheng

    2016-01-01

    Full Text Available Urges for sustainable development had pushed the government and professional bodies to respond and react by implementing regulations where possible to direct development in that manner. However, the outcome in most financial conferences and dialogues on sustainable buildings flagged on high construction and maintenance cost. Thus, this study is conducted to collect and analyze actual building operation and maintenance cost between GBI and Non-GBI rated buildings in Malaysia which are more than 2 years fully operated buildings. There are two categories of selected buildings which are residential and non-residential type of building. Each category of the building consists of similar building’s characteristic such as geographic location, mode of operation, building heights, total numbers of floors and units. The scope of building’s maintenance for this study is mainly on wear and tear of the wall painting, electrical light fittings, ceiling panels, roofing system and mechanical services like water pump system are recorded for their replacement frequency of service and the cost involved within a consistent period of 12 months operation at cost percentage saving of 78.9% and 40.4% for residential and non-residential buildings respectively compare against Non-GBI rated buildings. Electricity consumption for GBI rated buildings are lower than Non-GBI rated buildings which recorded at the cost variance of 23.8% and 6.3% and water consumption at 35.9% and 44.0% for the above mentioned two main categories of selected case study buildings. Results from this study conclude major savings on residential buildings category in term of maintenance cost and electricity consumption for GBI rated buildings. Whereby, non-residential category of buildings, GBI rated building had been proven to obtain significant savings in terms of maintenance cost and water consumption.

  8. Building information modeling based on intelligent parametric technology

    Institute of Scientific and Technical Information of China (English)

    ZENG Xudong; TAN Jie

    2007-01-01

    In order to push the information organization process of the building industry,promote sustainable architectural design and enhance the competitiveness of China's building industry,the author studies building information modeling (BIM) based on intelligent parametric modeling technology.Building information modeling is a new technology in the field of computer aided architectural design,which contains not only geometric data,but also the great amount of engineering data throughout the lifecycle of a building.The author also compares BIM technology with two-dimensional CAD technology,and demonstrates the advantages and characteristics of intelligent parametric modeling technology.Building information modeling,which is based on intelligent parametric modeling technology,will certainly replace traditional computer aided architectural design and become the new driving force to push forward China's building industry in this information age.

  9. 7 CFR 1944.659 - Replacement housing.

    Science.gov (United States)

    2010-01-01

    ... HPG funds; (3) Must meet all applicable requirements of 7 CFR 3550.57; and (4) May not be sold within... 7 Agriculture 13 2010-01-01 2009-01-01 true Replacement housing. 1944.659 Section 1944.659 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL...

  10. Retrograde replacement of the thoracic aorta.

    OpenAIRE

    Cooley, D A

    1995-01-01

    A technique is described for replacement of the entire thoracic aorta. In this "pull-through" technique, which utilizes hypothermic circulatory arrest, the graft is implanted in a retrograde fashion, thus providing protection for the spinal cord and brain and avoiding injury to the vagus and phrenic nerves.

  11. Revision Total Hip Replacement: A Case Report

    Directory of Open Access Journals (Sweden)

    Md Hafizur Rahman

    2013-07-01

    Full Text Available Total hip replacement is a reconstructive procedure that has improved the management of those diseases of the hip joint that have responded poorly to conventional medical therapy. Conventional, primary total hip replacement is a durable operation in the majority of patients. A hip replacement is a mechanical device with parts that are assembled before and during the operation. But the possible complications of total hip arthroplasty, and its clinical performance over time, is a challenging occasion to the surgeons, and such a challenge we faced with our presenting patient. A 68 year old lady with history of cemented bipolar hemiarthroplasty done in a tertiary care hospital, due to fracture neck of the left femur having the history of diabetes, chronic kidney disease, heart disease, anaemia, and mental disorders presented with loosened prosthesis, thinning of medial proximal cortex of the femur which had broken within few months after surgery. She complained of painful walking at left hip joint. There was also evidence of chronic infective and degenerative arthritis of acetabular component of the affected hip joint. Cemented revision total hip replacement surgery was performed with expert multidisciplinary involvement. On 2nd postoperative day the patient was allowed to walk on operated limb with the aid of walker. On 12th postoperative day all the stitches were removed and wound was found healthy.

  12. Artificial Cervical Disc Replacement Improves Mobility

    Medline Plus

    Full Text Available ... so much different than the fusion. The ProDisc C total disc replacement from Synthes Spine is an ... intervertebral disc in the cervical spine. The ProDisc C is indicated for patients suffering from intractable symptomatic ...

  13. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... you can do in life. And I think we're fortunate to have a greet staff who ... of medicine. At the end of the day, we can all walk away and say, "This is ... Geller. I'm here with Dr. William McCauley. We're here to talk about partial knee replacements. ...

  14. A Helix Replacement Mechanism Directs Metavinculin Functions

    Energy Technology Data Exchange (ETDEWEB)

    Rangarajan, Erumbi S.; Lee, Jun Hyuck; Yogesha, S.D.; Izard, Tina (Scripps)

    2010-10-11

    Cells require distinct adhesion complexes to form contacts with their neighbors or the extracellular matrix, and vinculin links these complexes to the actin cytoskeleton. Metavinculin, an isoform of vinculin that harbors a unique 68-residue insert in its tail domain, has distinct actin bundling and oligomerization properties and plays essential roles in muscle development and homeostasis. Moreover, patients with sporadic or familial mutations in the metavinculin-specific insert invariably develop fatal cardiomyopathies. Here we report the high resolution crystal structure of the metavinculin tail domain, as well as the crystal structures of full-length human native metavinculin (1,134 residues) and of the full-length cardiomyopathy-associated {Delta}Leu954 metavinculin deletion mutant. These structures reveal that an {alpha}-helix (H1{prime}) and extended coil of the metavinculin insert replace {alpha}-helix H1 and its preceding extended coil found in the N-terminal region of the vinculin tail domain to form a new five-helix bundle tail domain. Further, biochemical analyses demonstrate that this helix replacement directs the distinct actin bundling and oligomerization properties of metavinculin. Finally, the cardiomyopathy associated {Delta}Leu954 and Arg975Trp metavinculin mutants reside on the replaced extended coil and the H1{prime} {alpha}-helix, respectively. Thus, a helix replacement mechanism directs metavinculin's unique functions.

  15. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  16. Probability Issues in without Replacement Sampling

    Science.gov (United States)

    Joarder, A. H.; Al-Sabah, W. S.

    2007-01-01

    Sampling without replacement is an important aspect in teaching conditional probabilities in elementary statistics courses. Different methods proposed in different texts for calculating probabilities of events in this context are reviewed and their relative merits and limitations in applications are pinpointed. An alternative representation of…

  17. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... all walk away and say, "This is our team and it's a great team." Welcome to this OR Live Webcast presentation live ... that medial partial knee replacements don't really work. So they come in with the idea that ...

  18. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Baker, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  19. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... Pain Relief through Partial Knee Replacement NewYork-Presbyterian New York City, New York May 4, 2010 I've always felt ... carry it out every single day. Located in New York City, New York Presbyterian is ranked among ...

  20. Enzyme replacement therapy for alpha-mannosidosis

    DEFF Research Database (Denmark)

    Borgwardt, Line Gutte; Dali, Christine I.; Fogh, J;

    2013-01-01

    Alpha-mannosidosis (OMIM 248500) is a rare lysosomal storage disease (LSD) caused by alpha-mannosidase deficiency. Manifestations include intellectual disabilities, facial characteristics and hearing impairment. A recombinant human alpha-mannosidase (rhLAMAN) has been developed for weekly intrave...... intravenous enzyme replacement therapy (ERT). We present the preliminary data after 12 months of treatment....

  1. Artificial Cervical Disc Replacement Improves Mobility

    Medline Plus

    Full Text Available Artificial Cervical Disc Replacement Improves Mobility February 18, 2009 From PinnacleHealth, Harrisburg, PA Welcome to this “OR ... this new technology with the use of an artificial disc has some significant benefits over the previous ...

  2. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available Arthritic Pain Relief through Partial Knee Replacement NewYork-Presbyterian New York City, New York May 4, 2010 I've always felt ... cortisone injections, which really only provided short-lived relief. Ultimately, she underwent a knee arthroscopy procedure, where ...

  3. CANDU-PHW fuel channel replacement experience

    International Nuclear Information System (INIS)

    One of the main characteristics of the CANDU pressurized heavy water reactor is the use of pressure tubes rather than one large pressure vessel to contain the fuel and coolant. This provides an inherent design capability to permit their replacement in an expeditious manner, without seriously affecting the high capacity factors of the reactor units. Of th eight Ontario Hydro commercial nuclear generating units, the lifetime performance places seven of them (including two that have had some of their fuel channels replaced), in the top ten positions in the world's large nuclear-electric unit performance ranking. Pressure tube cracks in the rolled joint region have resulted in 70 fuel channels being replaced in three reactor units, the latest being at the Bruce Nuclear Generating Station 'A', Unit 2 in February 1982. The rolled joint design and rolling procedures have been modified to eliminate this problem on CANDU units subsequent to Bruce 'A'. This paper describes the CANDU pressure tube performance history and expectations, and the tooling and procedures used to carry out the fuel channel replacement

  4. INVESTIGATIONS ON RECYCLED CONCRETE AGGREGATE AND MSAND AS AGGREGATE REPLACEMENT IN CONCRETE

    OpenAIRE

    Sridhar, U; Karthick, B

    2015-01-01

    Gigantic numbers of building and destruction trashes are produced in emerging countries like India. The clearance of these trashes is serious problem because it requires huge space. The present work is to study the properties of concrete with replacement of 50% of nature sand by manufactured sand and coarse aggregates by different proportions with recycled concrete aggregates (RCA). A mix proportion for M20 grade concrete is derived with standards confirming to IS codes. RCA was p...

  5. BUILDING 341 Seismic Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Halle, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-15

    The Seismic Evaluation of Building 341 located at Lawrence Livermore National Laboratory in Livermore, California has been completed. The subject building consists of a main building, Increment 1, and two smaller additions; Increments 2 and 3.

  6. Arthritic Pain Relief through Partial Knee Replacement

    Medline Plus

    Full Text Available ... helps position our femoral component in place and build the proper rotation as well as the proper ... mentioned before, basically acts as a gout to hold the components into place. And shortly, we'll ...

  7. Building Philippine SMEs Resilience to Natural Disasters

    OpenAIRE

    Ballesteros, Marife M.; Sonny N. Domingo

    2015-01-01

    Disasters are bad for business specifically for small and medium enterprises (SMEs). These catastrophic events can compromise capital, logistics, product market, and labor, which compromise business continuity and recovery. Physical damage and disruptions in supply and labor can cause temporary business closure while structural repairs to buildings and recovery or replacement of damaged equipment needed to restore operations require large amount of resources. The adverse impact may not only b...

  8. Coronary Ostial Stenosis after Aortic Valve Replacement

    Science.gov (United States)

    Ziakas, Antonios G.; Economou, Fotios I.; Charokopos, Nicholas A.; Pitsis, Antonios A.; Parharidou, Despina G.; Papadopoulos, Thomas I.; Parharidis, Georgios E.

    2010-01-01

    Coronary ostial stenosis is a rare but potentially serious sequela after aortic valve replacement. It occurs in the left main or right coronary artery after 1% to 5% of aortic valve replacement procedures. The clinical symptoms are usually severe and may appear from 1 to 6 months postoperatively. Although the typical treatment is coronary artery bypass grafting, patients have been successfully treated by means of percutaneous coronary intervention. Herein, we present the cases of 2 patients in whom coronary ostial stenosis developed after aortic valve replacement. In the 1st case, a 72-year-old man underwent aortic valve replacement and bypass grafting of the saphenous vein to the left anterior descending coronary artery. Six months later, he experienced a non-ST-segment-elevation myocardial infarction. Coronary angiography revealed a critical stenosis of the right coronary artery ostium. In the 2nd case, a 78-year-old woman underwent aortic valve replacement and grafting of the saphenous vein to an occluded right coronary artery. Four months later, she experienced unstable angina. Coronary angiography showed a critical left main coronary artery ostial stenosis and occlusion of the right coronary artery venous graft. In each patient, we performed percutaneous coronary intervention and deployed a drug-eluting stent. Both patients were asymptomatic on 6-to 12-month follow-up. We attribute the coronary ostial stenosis to the selective ostial administration of cardioplegic solution during surgery. We conclude that retrograde administration of cardioplegic solution through the coronary sinus may reduce the incidence of postoperative coronary ostial stenosis, and that stenting may be an efficient treatment option. PMID:20844624

  9. Replacement steam generators for Calvert Cliffs, Oconee and future replacement design

    International Nuclear Information System (INIS)

    After the completion of steam generators presently being fabricated, a total of forty replacement steam generators will have been built for fourteen reactor units located at ten reactor sites. This represents approximately $1 billion of manufacture excluding installation costs. Replacement steam generator work began with the initiation of the Millstone 2 steam generator replacement program for Northeast Utilities in 1989. Manufacture is presently underway on replacement recirculating steam generators for Calvert Cliffs Units 1 and 2 plants of Constellation Nuclear (OEM Combustion Engineering) and the once-through steam generators for the Oconee 1, 2 and 3 plants of Duke Power (OEM Babcock and Wilcox). These two sites are the first and second respectively to have applied for and received approval for a life extension of 20 years beyond their original operating license. The application and granting of these license extensions reflects a major change in the nuclear industry over the recent past. The attitude to nuclear power has changed from a relatively defensive strategy to a much more optimistic agenda of utility reorganization, purchase of well performing older plants, replacement of aging components, plant refurbishment, and upgrades and applications for license extension. Possible new plants are also being considered. The paper discusses specific features, attributes, performance and operating experience with replacement steam generators (RSGs) both in service and under construction. Industry issues and design features applicable to future replacement steam generators are also reviewed. (author)

  10. Danish building typologies

    DEFF Research Database (Denmark)

    Wittchen, Kim Bjarne; Kragh, Jesper

    The objective of TABULA is to develop a harmonised building typology for European countries. Each national building typology will consist of a set of residential model buildings with characteristic energy-related properties (element areas of the thermal building envelope, U-values, supply system...... efficiencies). The model buildings will each represent a specific construction period of the country in question and a specific building size. Furthermore the number of buildings, flats and the overall floor areas will be given, which are represented by the different building types of the national typologies....

  11. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Units 2 that will extend the in-service life of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from the bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  12. 25 CFR 700.189 - Expenditure of replacement home benefits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Expenditure of replacement home benefits. 700.189 Section 700.189 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Replacement Housing Payments § 700.189 Expenditure of replacement home benefits. Replacement...

  13. 48 CFR 908.7101-4 - Replacement of motor vehicles.

    Science.gov (United States)

    2010-10-01

    ....7101-4 Replacement of motor vehicles. (a) The replacement of motor vehicles shall be in accordance with the replacement standards prescribed in FPMR 41 CFR 101-38.9 and DOE-PMR 41 CFR 109-38.9. (b) The... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Replacement of...

  14. Sustainable Buildings in Interaction

    DEFF Research Database (Denmark)

    Elle, Morten

    developments are going to consist of passive houses. The first sustainable buildings were built by their users, and the user – building interaction still play a decisive role for the performance of the present sustainable buildings. The users have to understand how the building functions. Urban design is...... essential for the possibilities of a sustainable building design: orientation and access to infrastructure are important factor. And the building design is decisive in making the city truly compact: dense in activities. In future, the interaction between the technical infrastructure, the buildings and their......The first attempts to build sustainable buildings in Denmark were typically located on the countryside. The basic idea was to create buildings that were independent of the technical infrastructure. District heating has, however, been the dominating solution to heating in buildings in Denmark, and...

  15. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    Energy Technology Data Exchange (ETDEWEB)

    DiCello, D.C.; Odell, A.D.; Jackson, T.J. [PECO Energy Co., Delta, PA (United States)

    1995-03-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific ({mu}Ci/cm{sup 2}) of Co-60 and Zn-65 were analyzed.

  16. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    International Nuclear Information System (INIS)

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific (μCi/cm2) of Co-60 and Zn-65 were analyzed

  17. Replacement Power Facility site selection report

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site

  18. GH-replacement therapy in adults

    DEFF Research Database (Denmark)

    Christiansen, J S; Jørgensen, J O; Pedersen, S A;

    1991-01-01

    Growth hormone (GH) deficiency in adults, whether GH deficient since childhood or patients rendered GH deficient in adult life, is associated with psychosocial maladjustment, reduced muscle strength and reduced exercise capacity. Body composition is significantly altered with increased fat and......, normalization of body composition, increased muscle strength, improved exercise capacity, increased cardiac performance and increase in bone mineral mass as well as in serum markers of bone turnover, and normalization of kidney function. Thus GH replacement therapy in GH-deficient adults exhibits potential long......-term beneficial effects. A number of important questions has to be addressed before long-term GH replacement therapy in GH-deficient adults can be considered on a routine basis....

  19. Technical evaluation process for specifying replacement items

    International Nuclear Information System (INIS)

    As nuclear power plants continue in the transition to a strictly operating and maintenance mode, the engineering involvement required to specify and procure replacement parts and components continues to increase. The evaluation process for a replacement item has one simple goal: to specify an effective set of technical and quality requirements that will result in the procurement of an item meeting the plant design basis. The evaluation process is depicted in a simplified block diagram showing the elements of engineering evaluation from a functional perspective. These elements are the following: (1) need for a technical evaluation; (2) components and part classification; (3) failure mode and effect analysis (FMEA); (4) critical characteristics for design determination; (5) like-for-like or alternate item evaluation; and (6) technical and quality requirements determination

  20. Acquired angioedema secondary to hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    Malani Kumar

    2005-10-01

    Full Text Available Angioedema is a potentially life threatening condition and may be either inherited or acquired. The latter is rare with only a handful of cases reported in the world literature. Presenting complaints are often vague. Those most commonly described include swelling in the subcutaneous and submucosal tissues. Patients presenting with laryngeal edema have high mortality, and high clinical suspicion is necessary to avoid instrumentation, which can precipitate laryngeal spasm. We present a review of reported cases of hormonally induced hereditary angioedema, along with a report of a patient with acquired angioedema secondary to hormone replacement therapy. To the best of our knowledge, this case probably represents the first reported case of acquired angioedema secondary to hormone replacement therapy.

  1. Transcatheter aortic valve replacement in elderly patients

    Institute of Scientific and Technical Information of China (English)

    Dimytri Siqueira; Alexandre Abizaid; Magaly Arrais J.; Eduardo Sousa

    2012-01-01

    Aortic stenosis is the most common native valve disease, affecting up to 5% of the elderly population. Surgical aortic valve replacement reduces symptoms and improves survival, and is the definitive therapy in patients with symptomatic severe aortic stenosis. However, despite the good results of classic surgery, risk is markedly increased in elderly patients with co-morbidities. Transcatheter aortic valve replacement (TAVR) allows implantation of a prosthetic heart valve within the diseased native aortic valve without the need for open heart surgery and cardiopulmonary bypass, offering a new therapeutic option to elderly patients considered at high surgical risk or with contraindications to surgery. To date, several multicenter registries and a randomized trial have confirmed the safety and efficacy of TAVR in those patients. In this chapter, we review the background and clinical applications of TAVR in elderly patients.

  2. Tissue engineering: an option for esophageal replacement?

    Science.gov (United States)

    Zani, Augusto; Pierro, Agostino; Elvassore, Nicola; De Coppi, Paolo

    2009-02-01

    Esophageal replacement is required in several pediatric surgical conditions, like long-gap esophageal atresia. Although several techniques have been described to bridge the gap, all of them could be followed by postoperative complications. Esophageal tissue engineering could represent a valid alternative thanks to the recent advances in biomaterial science and cellular biology. Numerous attempts to shape a new esophagus in vitro have been described in the last decade. Herein, we review the main studies on the experimental use of nonabsorbable and absorbable materials as well as the development of cellularized patches. Furthermore, we describe the future perspectives of esophageal tissue engineering characterized by the use of stem cells seeded on new biopolymers. This opens to the construction of a functional allograft that could allow an anatomical replacement that grows with the children and does not severely impair their anatomy. PMID:19103424

  3. Reliability tests for reactor internals replacement technology

    International Nuclear Information System (INIS)

    Structural damage due to aging degradation of LWR reactor internals has been reported in several nuclear plants. NUPEC has started a project to test the reliability of the technology for replacing reactor internals, which was directed at preventive maintenance before damage and repair after damage for the aging degradation. The project has been funded by the Ministry of International Trade and Industry (MITI) of Japan since 1995, and it follows the policy of a report that the MITI has formally issued in April 1996 summarizing the countermeasures to be considered for aging nuclear plants and equipment. This paper gives an outline of the whole test plans and the test results for the BWR reactor internals replacement methods; core shroud, ICM housing, and CRD Housing and stub tube. The test results have shown that the methods were reliable and the structural integrity was appropriate based on the evaluation. (author)

  4. Oral Fluid Replacement in Severe Dehydration

    OpenAIRE

    Z Nowroozi; M Sheykh Salimi; R Baradaran; N Sirazi Majd; SJ Sharifi

    1990-01-01

    In order to compare the therapeutic effect of oral versus intravenous fluid replacement, 903 pediatric patients aged 1 to 24 months with diarrhea and moderate to severe dehydration were randomly selected and treated in 12 hospitals over the country. 482 patients were treated orally and 421 intravenously. Oral rehydration fluid consisted of 2 different isotonic solutions: A. "Rehydration solution" contained 40 mmol/l Na and 20 mmol/l K. this solution was administration in a quantity of 40 ml/k...

  5. Progress with the Australian replacement research reactor

    International Nuclear Information System (INIS)

    Construction of the new Australian Research Reactor, the replacement for the now 46 year old HIFAR research reactor, is approximately 80% completed. Construction of the reactor facility began in April 2002 at ANSTO's Lucas Heights site near Sydney and commissioning is still on track for late 2005. Some details of the progress of construction and licensing and an outline of ANSTO research related to the use of Zircaloy-4 in the core region and reflector vessel of the reactor are given. (author)

  6. Metabolic Impact of Estrogen Replacement Therapy

    Directory of Open Access Journals (Sweden)

    Villa P

    2010-01-01

    Full Text Available Menopause is associated with unfavourable changes in the blood lipid profile as well as with a deterioration of glucose tolerance, which may help in increasing the incidence of cardiovascular diseases. In the same way Hormone Replacement Therapy (HRT has different metabolic impact in relationship to the dose of estrogen component, the type of progestin and the route of administration. Most of the studies analyzed the effect of the combined estroprogestin therapy, therefore, the impact of the estrogen component alone isn’t always differentiable but principal results are generally consistent. This review aimes to expound the metabolic impact of the estrogen replacement administration in postmenopausal women. A literature review was conducted to identify all the prospective, the randomized trials and to compare the effects of both low and high-dose therapy and route of administration (oral and transdermal. The results of estrogen replacement therapy on glucose metabolism showed minimal changes and differences among treatments. Some studies showed that neither peroral nor transdermal estradiol replacement therapy induced any negative effects on glucose metabolism. The estrogen substitution increases the rate of apolipoprotein metabolism in various degrees, depending on the type of lipoprotein. At present a considerable data document an increase in HDL and a reduction of LDL cholesterol, following estrogen therapy. Studies have clearly established that the estrogen treatment decreases total plasma cholesterol and increases or maintains plasma triglyceride levels. In conclusion the studies of ERT’s effects on glucose and lipid metabolism are heterogeneous but all together the ERT impact may be considered neutral. However the low doses of estrogen therapy may give some beneficial effects. Above all the treatment may prevent the physiological worsening of the glucose and lipid metabolism in menopause.

  7. Selection and Development of Replacement Beef Heifers

    OpenAIRE

    Stenquist, Norris J.; Bennett, James A.

    1992-01-01

    Selection, development, management, and nutrition of heifer calves to be used as herd replacements are key factors in maintaining beef herd productivity. A cow/calf producer, to be successful, must have some goals or criterion for heifer selection and development. For practically all Utah cattle production areas, economics dictate that heifers must calve as two-year-olds. Heifers must be properly developed and managed to permit this. The following factors are important: Heifers should 1) beco...

  8. Nonclinical Development of BCG Replacement Vaccine Candidates

    OpenAIRE

    Bernd Eisele; Martin Gengenbacher; Reginald Kidd; David McCown; Sheldon Morris; Steven Derrick; David Hokey; Dominick Laddy; Rosemary Chang; Megan Fitzpatrick; Leander Grode; Kamalakannan Velmurugan; Stefan H. E. Kaufmann; John Fulkerson; Brennan, Michael J.

    2013-01-01

    The failure of current Mycobacterium bovis bacille Calmette–Guérin (BCG) vaccines, given to neonates to protect against adult tuberculosis and the risk of using these live vaccines in HIV-infected infants, has emphasized the need for generating new, more efficacious and safer replacement vaccines. With the availability of genetic techniques for constructing recombinant BCG (rBCG) strains containing well-defined gene deletions or insertions, new vaccine candidates are under evaluation at both ...

  9. The Demand for Nicotine Replacement Therapies

    OpenAIRE

    John A. Tauras; Chaloupka, Frank J.

    2001-01-01

    This paper is the first econometric study to examine the determinants of nicotine replacement therapy (NRT) demand. Pooled cross-sectional time-series scanner-based data for 50 major metropolitan markets in the United States covering the period between the second quarter 1996 and the third quarter 1999 are used in the analysis. Fixed-effects modeling is employed to assess the impact of NRT prices, cigarette prices, and other determinants on NRT demand. The estimates indicate that decreases in...

  10. Material Science in Cervical Total Disc Replacement

    OpenAIRE

    Pham, Martin H.; Mehta, Vivek A.; Alexander Tuchman; Hsieh, Patrick C.

    2015-01-01

    Current cervical total disc replacement (TDR) designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti), and cobalt-chrome (CoCr). These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common ...

  11. Biosurfactants: a sustainable replacement for chemical surfactants?

    Science.gov (United States)

    Marchant, Roger; Banat, Ibrahim M

    2012-09-01

    Glycolipid biosurfactants produced by bacteria and yeasts provide significant opportunities to replace chemical surfactants with sustainable biologically produced alternatives in bulk commercial products such as laundry detergents and surface cleaners. Sophorolipids are already available in sufficient yield to make their use feasible while rhamnolipids and mannosylerythritol lipids require further development. The ability to tailor the biosurfactant produced to the specific needs of the product formulation will be an important future step. PMID:22618240

  12. Soft tissue balancing in total shoulder replacement

    OpenAIRE

    Mueller, Maike; Hoy, Gregory

    2014-01-01

    Total shoulder arthroplasty is now capable of recreating near anatomic reproduction of native bony shoulder anatomy, but the function and longevity of anatomic shoulder replacement is dependent on a competent soft tissue envelope and adequate motoring of all musculo-tendinous units about the shoulder. Balancing the soft tissues requires understanding of the anatomy and pathology, as well as technical skills. The advent of reverse shoulder biomechanics has brought with it special requirements ...

  13. Flow boiling test of GDP replacement coolants

    International Nuclear Information System (INIS)

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C4F10 and C4F8, were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C4F10 mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C4F10 weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd

  14. Retention Benefit Based Intelligent Cache Replacement

    Institute of Scientific and Technical Information of China (English)

    李凌达; 陆俊林; 程旭

    2014-01-01

    The performance loss resulting from different cache misses is variable in modern systems for two reasons: 1) memory access latency is not uniform, and 2) the latency toleration ability of processor cores varies across different misses. Compared with parallel misses and store misses, isolated fetch and load misses are more costly. The variation of cache miss penalty suggests that the cache replacement policy should take it into account. To that end, first, we propose the notion of retention benefit. Retention benefits can evaluate not only the increment of processor stall cycles on cache misses, but also the reduction of processor stall cycles due to cache hits. Then, we propose Retention Benefit Based Replacement (RBR) which aims to maximize the aggregate retention benefits of blocks reserved in the cache. RBR keeps track of the total retention benefit for each block in the cache, and it preferentially evicts the block with the minimum total retention benefit on replacement. The evaluation shows that RBR can improve cache performance significantly in both single-core and multi-core environment while requiring a low storage overhead. It also outperforms other state-of-the-art techniques.

  15. Replacement of heavy components of the Main Primary System (MPS). Recent innovations made by Framatome ANP

    International Nuclear Information System (INIS)

    The replacement of heavy components is the result of widespread stress corrosion of Inconel 600 (and alloys 82/182) in the primary system. Following the corrosion of steam generator tubes, which led to the first steam generator replacement (SGR) operations, work has begun on reactor vessel head replacements (RVHR) and pressurizer replacements, pending treatment of the dissimilar butt welds (DBW). The replacement of sections of the Main Primary System is one way of optimizing plant lifetime besides preventing stress corrosion in primary components and combating phenomena as thermal fatigue or certain metallurgical weaknesses. The increase in the number of major operations carried out in the reactor building on PWR and BWR reactor geometries has called for major technical innovations. AREVA, has over the past twenty years carried out more than forty SGRs throughout the world, including the supply of 115 steam generators of all types. This equates to over 60% of all SGR operations performed in Europe and the USA. Today, most SGR operations are performed in the USA, though some still continue in Europe and Asia. Operations have been planned until 2015. The first RVHR operations were carried out in France in 1993, and have been widespread in Europe since 1996 (Spain and Belgium), and in the USA since 2002 (Davis Besse). Since 1993 AREVA, through its subsidiaries Framatome ANP, Jeumont SA and SGT, has performed 72 RVHRs, i.e. most of those carried out in Europe and the USA. Today, RVHR operations take place throughout the world and have been planned until 2014. The first pressurizer replacement took place in the fall of 2005 in Saint Lucie, USA. Others are to follow (Fort Calhoun, Millestone). A significant number of partial or complete pressurizer replacements are now being scheduled. Special focus must be given to this new operation, as a decision is required between the following types of replacements, taking into account the number of pressurizer heaters and the

  16. Global Building Physics

    DEFF Research Database (Denmark)

    Rode, Carsten

    2012-01-01

    aspects of the building as defined in building engineering. We live in an international society and building solutions are developed across country borders. Building physics is a global theme. The International Association of Building Physics has global appeal. The keynote lecture and this brief paper......High ambitions are set for the building physics performance of buildings today. No single technology can achieve fulfilment of these ambitions alone. Integrated, multi-facetted solutions and optimization are necessary. A holistic, or “global”, technological perspective is needed, which includes all...

  17. Global building physics

    DEFF Research Database (Denmark)

    Rode, Carsten

    2013-01-01

    aspects of the building as defined in building engineering. We live in an international society and building solutions are developed across country borders. Building physics is a global theme. The International Association of Building Physics has global appeal. This brief article reports the keynote......High ambitions are set for the building physics performance of buildings today. No single technology can achieve fulfilment of these ambitions alone. Integrated, multi-facetted solutions and optimization are necessary. A holistic, or ‘global’, technological perspective is needed, which includes all...

  18. Iterative model building, structure refinement and density modification with the PHENIX AutoBuild wizard

    International Nuclear Information System (INIS)

    The highly automated PHENIX AutoBuild wizard is described. The procedure can be applied equally well to phases derived from isomorphous/anomalous and molecular-replacement methods. The PHENIX AutoBuild wizard is a highly automated tool for iterative model building, structure refinement and density modification using RESOLVE model building, RESOLVE statistical density modification and phenix.refine structure refinement. Recent advances in the AutoBuild wizard and phenix.refine include automated detection and application of NCS from models as they are built, extensive model-completion algorithms and automated solvent-molecule picking. Model-completion algorithms in the AutoBuild wizard include loop building, crossovers between chains in different models of a structure and side-chain optimization. The AutoBuild wizard has been applied to a set of 48 structures at resolutions ranging from 1.1 to 3.2 Å, resulting in a mean R factor of 0.24 and a mean free R factor of 0.29. The R factor of the final model is dependent on the quality of the starting electron density and is relatively independent of resolution

  19. Retrofitting Listed Buildings

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2011-01-01

    The paper presents a case study where the energy demand for a listed building constructed in 1900 is reduced. Many older buildings are listed and have restrictions that include the entire building or that include only its exterior. For the building presented, only its exterior facade is listed. The...... the local urban environment and therefore listed. The reduced energy demand, related to individual measures, is estimated and building physics requirements are addressed together with the economic options for evaluating the profitability....

  20. Challenge of Replacing Obsolete Equipment and Systems on Brownfield Sites

    International Nuclear Information System (INIS)

    The Nuclear Decommissioning Authority (NDA) is responsible for the decommissioning and clean-up of the UK's civil public sector nuclear sites. One of their top priorities is the retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond (FGMSP) at Sellafield site which is one of the most complex and compact nuclear sites in the world. The FGMSP plant is currently undergoing a series of major modifications in preparation for the retrievals operations. One of the most challenging modifications undertaken in the facility has been the Control and Surveillance Project which covered replacement of the existing Environmental Monitoring System, this presented the complex challenge of replacing an existing system whilst maintaining full functionality on a live radiological safety system with a constant radiological hazard. The Control and Surveillance Project involved the design, procurement, installation, changeover and commissioning of a new Radiological Surveillance System (alpha, beta and gamma monitoring) along with Building Evacuation Systems within the FGMSP complex to replace the existing obsolete system. This Project was a key enabler to future FGMSP retrievals and decommissioning activities. The project objective was to create and maintain a safe radiological working environment for over 450 personnel working in the plant up to 2020. The Legacy Ponds at Sellafield represent one of the biggest challenges in the civil nuclear clean up portfolio in the UK. Retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond (FGMSP), and its safe long term storage is one of the NDA's top priorities. In June 2002 Sellafield Ltd contracted with the ACKtiv Nuclear Joint Venture to progress the risk mitigation, asset restoration and the early enabling works associated with preparation for clean up. Since then significant progress has been made in preparing the facility, and it's support systems, for the clean-up operations. This has been

  1. Building integrated concentrating photovoltaics: A review

    International Nuclear Information System (INIS)

    For building integration, Concentrating Photovoltaic (CPV) systems can offer a host of advantages over conventional flat panel devices, the most notable being: a higher electrical conversion efficiency in the PV cells, better use of space, ease of recycling of constituent materials, and reduced use of toxic products involved in the PV cells' production process. However, the viability of Building-Integrated Concentrating PV (BICPV) systems is dependent on their ability to offer a comparative economic advantage over flat panel photovoltaic technologies whose market prices are decreasing from day to day and which offer other advantages such as ease of replacement of structural elements. A comparative analysis is presented of the main existing CPV systems' suitability for use in buildings, in which the different challenges specific to integration of each system are discussed. The systems are categorized by type of concentration technology and concentration factor. (author)

  2. Importance of Building Code

    Directory of Open Access Journals (Sweden)

    Reshmi Banerjee

    2015-06-01

    Full Text Available A building code, or building control, is a set of rules that specify the minimum standards for constructed objects such as buildings and non building structures. The main purpose of building codes are to protect public health, safety and general welfare as they relate to the construction and occupancy of buildings and structures. The building code becomes law of a particular jurisdiction when formally enacted by the appropriate governmental or private authority. Building codes are generally intended to be applied by architects, engineers, constructors and regulators but are also used for various purposes by safety inspectors, environmental scientists, real estate developers, subcontractors, manufacturers of building products and materials, insurance companies, facility managers, tenants and others.

  3. Sustainable Buildings in Interaction

    DEFF Research Database (Denmark)

    Elle, Morten

    The first attempts to build sustainable buildings in Denmark were typically located on the countryside. The basic idea was to create buildings that were independent of the technical infrastructure. District heating has, however, been the dominating solution to heating in buildings in Denmark, and...... the focus on sustainable building have gradually turned from special houses on the countryside to normally looking houses in the urban fabric, integrated in the technical infrastructure. Some new built urban areas in Denmark will, however, not have to be supplied with district heating – these...... developments are going to consist of passive houses. The first sustainable buildings were built by their users, and the user – building interaction still play a decisive role for the performance of the present sustainable buildings. The users have to understand how the building functions. Urban design is...

  4. Lower limb joint replacement in rheumatoid arthritis

    Directory of Open Access Journals (Sweden)

    Clement Nicholas D

    2012-06-01

    Full Text Available Abstract Introduction There is limited literature regarding the peri-operative and surgical management of patients with rheumatoid disease undergoing lower limb arthroplasty. This review article summarises factors involved in the peri-operative management of major lower limb arthroplasty surgery for patients with rheumatoid arthritis. Methods We performed a search of the medical literature, using the PubMed search engine (http://www.pubmed.gov. We used the following terms: ‘rheumatoid’ ‘replacement’ ‘arthroplasty’ and ‘outcome’. Findings The patient should be optimised pre-operatively using a multidisciplinary approach. The continued use of methotrexate does not increase infection risk, and aids recovery. Biologic agents should be stopped pre-operatively due the increased infection rate. Patients should be made aware of the increased risk of infection and periprosthetic fracture rates associated with their disease. The surgical sequence is commonly hip, knee and then ankle. Cemented total hip replacement (THR and total knee replacement (TKR have superior survival rates over uncemented components. The evidence is not clear regarding a cruciate sacrificing versus retaining in TKR, but a cruciate sacrificing component limits the risk early instability and potential revision. Patella resurfacing as part of a TKR is associated with improved outcomes. The results of total ankle replacement remain inferior to THR and TKR. RA patients achieve equivalent pain relief, but their rehabilitation is slower and their functional outcome is not as good. However, the key to managing these complicated patients is to work as part of a multidisciplinary team to optimise their outcome.

  5. Aorto-right atrial fistula after ascending aortic replacement or aortic value replacement

    International Nuclear Information System (INIS)

    Objective: To evaluate the CT features of aorto-right atrial fistula after aortic valve replacement (AVR) or ascending aortic replacement. Methods: Eighty-seven patients with aortic-right atrial fistula underwent CT after operation. The CT features were retrospectively analyzed. Fistula was measured according to maximum width of the shunt. Results: Aorto-right atrial fistula was detected in 87 patients after aortic valve replacement or ascending aortic replacement by CT scan. Among them, 25 patients were diagnosed as mild aorto-right atrial fistula, 47 patients as moderate, and 15 patients as severe. Thirty-seven patients underwent follow-up CT.Among them, 10 patients with mild to moderate aorto-right atrial fistula were considered to have complete regression, 8 patients with mild aorto-right atrial fistula considered to have incomplete regression, 14 patients with mild to moderate aorto-right atrial fistula considered to have stable condition, and 5 patients with moderate aorto-right atrial fistula considered to have progression at the 3-month follow-up. Conclusion: CT is a useful tool for defining aorto-right atrial fistula after AVR or ascending aortic replacement and for evaluating it in follow-up. (authors)

  6. Replacement of the ISIS control system

    International Nuclear Information System (INIS)

    In operation since 1985, ISIS is the world's most powerful pulsed spallation neutron source. The decision has been taken to replace the existing ISIS control system, which has been in use for over ten years. The problems of such a project, given the legacy of processor specific hardware and software are discussed, a long with the problems associated with incorporating existing interface hardware into any new system. Present progress using commercial workstation based control software is presented with, an assessment of the benefits and pitfalls of such an approach. (author)

  7. Replacing Anthropy with entropy: Does it work?

    CERN Document Server

    Maor, Irit; Krauss, Lawrence M; Ng, Y Jack; Starkman, Glenn D

    2008-01-01

    Probably not, because there are lots of manifestly unanthropic ways of producing entropy. We demonstrate that the Causal Entropic Principle (CEP), as a replacement for the anthropic principle to explain the properties of the observed universe, suffers from many of the same problems of adopting myopic assumptions in order to predict that various fundamental parameters take approximately the observed values. In particular, we demonstrate that four mechanisms -- black hole production, black hole decay, phase transitions, and dark matter annihilations or decays -- will manifestly change the conclusions of the CEP to predict that we should live in a universe quite different than the one in which we find ourselves.

  8. Mitochondrial Dna Replacement Versus Nuclear Dna Persistence

    OpenAIRE

    Serva, Maurizio

    2006-01-01

    In this paper we consider two populations whose generations are not overlapping and whose size is large. The number of males and females in both populations is constant. Any generation is replaced by a new one and any individual has two parents for what concerns nuclear DNA and a single one (the mother) for what concerns mtDNA. Moreover, at any generation some individuals migrate from the first population to the second. In a finite random time $T$, the mtDNA of the second population is comple...

  9. Steam generator replacement project in 2000

    International Nuclear Information System (INIS)

    NE Krsko has awarded the contract for the Steam Generator Replacement Project, which is one of the modernization projects in Krsko, to the Consortium of Siemens / Framatome in February 1998. This paper deals with the various aspects of the project: scope planning, engineering, preparation of modification packages for licensing, management, major techniques used, etc., showing also the status of the activities for the project which are scheduled to be performed in April through June 2000. The project is being performed on a turnkey basis, that means the Consortium is performing all engineering, preparation of the modification packages and site activities; NE Krsko is dealing with the licensing of the project.(author)

  10. Replacing the Beam Dump at the Booster

    CERN Multimedia

    2013-01-01

    The PS Booster Dump, designed in the 1960’s to cope with beam energies in the order of 800 MeV, has been dismantled and replaced with a new one, capable of withstanding the 2 GeV beam provided by the upcoming LINAC4 at CERN. This video shows the installation of that new dump core inside a one-metre diameter cavity, surrounded by five shielding rings made of concrete and steel. It is the culmination of months of preparation, an interdisciplinary work involving several teams from the Engineering, Beams and Technology Departments, as well as the collaboration and supervision of radio-protection experts.

  11. Segmental blood pressure after total hip replacement

    DEFF Research Database (Denmark)

    Gebuhr, Peter Henrik; Soelberg, M; Henriksen, Jens Henrik Sahl

    1992-01-01

    Twenty-nine patients due to have a total hip replacement had their systemic systolic and segmental blood pressures measured prior to operation and 1 and 6 weeks postoperatively. No patients had signs of ischemia. The segmental blood pressure was measured at the ankle and at the toes. A significant...... drop was found in all pressures 1 week postoperatively. The decrease followed the systemic pressure and was restored to normal after 6 weeks. In a group of six patients with preoperatively decreased ankle pressure, a significant transient further decrease in the ankle-toe gradient pressure was found...

  12. Heterotopic ossification following lumbar total disc replacement

    OpenAIRE

    Park, Se-Jun; Kang, Kyung-Jung; Shin, Seong-Kee; Chung, Sung-Soo; Lee, Chong-Suh

    2010-01-01

    The main goal of total disc replacement (TDR) is to preserve motion. Despite reports of good clinical outcomes, various degrees of heterotopic ossification after TDR have been reported. The purpose of this study was to investigate the prevalence and its clinical relevance of heterotopic ossification. We evaluated 65 consecutive patients (82 segments) with mean follow-up duration of 45 months (range, 12–88 months). Two kinds of prosthesis, ProDisc® for 75 segments (91.5%) and CHARITETM for sev...

  13. Prosthesis infections after orthopedic joint replacement

    DEFF Research Database (Denmark)

    Song, Zhijun; Borgwardt, Lotte; Høiby, Niels;

    2013-01-01

    Prosthesis-related infection is a serious complication for patients after orthopedic joint replacement, which is currently difficult to treat with antibiotic therapy. Consequently, in most cases, removal of the infected prosthesis is the only solution to cure the infection. It is, therefore......, important to understand the comprehensive interaction between the microbiological situation and the host immune responses that lead to prosthesis infections. Evidence indicates that prosthesis infections are actually biofilm-correlated infections that are highly resistant to antibiotic treatment and the...... microbiological and surgical measures. Recent progress in research into bacterial biofilm and possible future treatment options of prosthesis-related infections are discussed....

  14. Infective endocarditis following transcatheter aortic valve replacement-

    DEFF Research Database (Denmark)

    Loh, Poay Huan; Bundgaard, Henning; S�ndergaard, Lars

    2013-01-01

    Transcatheter aortic valve replacement (TAVR) can improve the symptoms and prognosis of patients with severe aortic stenosis who, due to a high expected operative risk, would not have otherwise been treated surgically. If these patients develop prosthetic valve endocarditis, their presentations may...... be atypical causing a delay in the diagnosis and treatment. The management is also complicated by their comorbidities, and surgical treatment may not be feasible leading to a significant morbidity and mortality. We describe a case of an 85-year-old man with TAVI prosthetic valve endocarditis...

  15. Applied building physics

    CERN Document Server

    Hens, Hugo S L C

    2012-01-01

    The energy crises of the 1970s, persisting moisture problems, complaints about sick buildings, thermal, visual and olfactory discomfort, and the move towards more sustainability in building construction have pushed Building Physics to the forefront of building innovation. The societal pressure to diminish energy consumption in buildings without impairing usability acted as a trigger to activate the whole notion of performance based design and construction. As with all engineering sciences, Building Physics is oriented towards application, which is why, after a first book on fundamentals this s

  16. Utilization of Palm Oil Clinker as Cement Replacement Material

    Directory of Open Access Journals (Sweden)

    Jegathish Kanadasan

    2015-12-01

    Full Text Available The utilization of waste materials from the palm oil industry provides immense benefit to various sectors of the construction industry. Palm oil clinker is a by-product from the processing stages of palm oil goods. Channelling this waste material into the building industry helps to promote sustainability besides overcoming waste disposal problems. Environmental pollution due to inappropriate waste management system can also be drastically reduced. In this study, cement was substituted with palm oil clinker powder as a binder material in self-compacting mortar. The fresh, hardened and microstructure properties were evaluated throughout this study. In addition, sustainability component analysis was also carried out to assess the environmental impact of introducing palm oil clinker powder as a replacement material for cement. It can be inferred that approximately 3.3% of cement production can be saved by substituting palm oil clinker powder with cement. Reducing the utilization of cement through a high substitution level of this waste material will also help to reduce carbon emissions by 52%. A cleaner environment free from pollutants can be created to ensure healthier living. Certain industries may benefit through the inclusion of this waste material as the cost and energy consumption of the product can be minimized.

  17. PURIFIED WASTE FCC CATALYST AS A CEMENT REPLACEMENT MATERIAL

    Directory of Open Access Journals (Sweden)

    Danute Vaiciukyniene

    2015-06-01

    Full Text Available Zeolites are commonly used in the fluid catalytic cracking process. Zeolite polluted with oil products and became waste after some time used. The quantity of this waste inevitably rises by expanding rapidly oil industry. The composition of these catalysts depends on the manufacturer and on the process that is going to be used. The main factors retarding hydration process of cement systems and modifying them strength are organic compounds impurities in the waste FCC catalyst. The present paper shows the results of using purified waste FCC catalyst (pFCC from Lithuania oil refinery, as Portland cement replacement material. For this purpose, the purification of waste FCC catalyst (FCC samples was treated with hydrogen peroxide. Hydrogen peroxide (H2O2 is one of the most powerful oxidizers known. By acting of waste with H2O2 it can eliminate the aforementioned waste deficiency, and the obtained product becomes one of the most promising ingredients, in new advanced building materials. Hardened cement paste samples with FCC or pFCC were formed. It was observed that the pFCC blended cements developed higher strength, after 28 days, compared to the samples with FCC or reference samples. Typical content of Portland cement substituting does not exceed 30 % of mass of Portland cement in samples. Reducing the consumption of Portland cement with utilizing waste materials is preferred for reasons of environmental protection.

  18. Life Cycle Assessment of Renewable Energy Alternatives for Replacement of Natural Gas in Building Material Industry

    OpenAIRE

    Rēpele, M; Bažbauers, G

    2014-01-01

    Environmental impacts of “cradle-to-gate” brick production stages was assessed and the effect of fuel substitution and variation of electricity mix on the impact was evaluated. Scenarios with natural gas, bio-methane, first and second generation bio-fuels used as the fuels in industrial furnace were studied. Scenarios were analyzed using “ReCiPe” and “EcoIndicator’99” impact assessment methods.

  19. Oral Fluid Replacement in Severe Dehydration

    Directory of Open Access Journals (Sweden)

    Z Nowroozi

    1990-07-01

    Full Text Available In order to compare the therapeutic effect of oral versus intravenous fluid replacement, 903 pediatric patients aged 1 to 24 months with diarrhea and moderate to severe dehydration were randomly selected and treated in 12 hospitals over the country. 482 patients were treated orally and 421 intravenously. Oral rehydration fluid consisted of 2 different isotonic solutions: A. "Rehydration solution" contained 40 mmol/l Na and 20 mmol/l K. this solution was administration in a quantity of 40 ml/kg/h until the signs of dehydration totally disappeared. B. "Maintenance solution" contained 40 mmol/l Na and 30 mmol/l K, and was administrated gradually in a quantity of 250 ml/kg/h until the bowel movement was normalized. Clinical signs at the time of admission to hospital, response to treatment, complications, failure in treatment and mortality in both patient groups showed no difference. It is concluded that oral fluid replacement therapy can be as effective as intravenous treatment of sever dehydration

  20. LS1 Report: Replacing an antique

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    At the PS Booster, the old beam dump and the shielding blocks surrounding it have been removed (see here). Installation of the new beam dump is now under way (see video).   The new PSB beam dump during its installation. At the PS, replacement of the old cooling and ventilation system, which dated back to 1957, is progressing well. The dismantling phase has just been completed and the tunnel is being prepared to receive a brand new ventilation system offering more efficient aeration of radioactive areas. At the same time, testing of the newly installed access system is under way. At the SPS, all the equipment of the Long Straight Section 1 (LSS1) has been removed to make way for the campaign to replace the irradiated cables, which started this week. In the LHC, the Radiation to Electronics (R2E) campaign is still progressing at a good clip, especially at Point 1, where the teams are two and a half months ahead of schedule. The Superconducting Magnets and Circuits Consolidation (SMACC) proje...

  1. New and old technologies for organ replacement

    Science.gov (United States)

    Platt, Jeffrey L.; Cascalho, Marilia

    2016-01-01

    Purpose of review The demand for organ transplantation has increased over time, increasingly exceeding the supply of organs. Whether and how new or old technologies separately or together could be applied to replacing organs will thus remain a question of importance. Recent findings Estimating how the demand for organ transplantation will evolve over the decades and the need to bring forward and test new technologies will help establish the dimensions of the problem and the priorities for investigation. Pluripotent stem cells can in principle expand to sufficient numbers, differentiate, and assemble complex and functional organs. However, the devising of effective and reliable means to coax the stem cells to do so remains beyond the current grasp. Summary Given the time during which novel therapies are devised and applied, which organ transplantation reaches to 2–3 decades, one can anticipate the need for organ replacement will grow dramatically, but advances in science and technology will overcome the hurdles in generating new organs. Whether these advances will address the needs and priorities of society, however, is unclear. PMID:23449347

  2. An improved financial tool to replace BHT

    CERN Multimedia

    2002-01-01

    In November, the BHT tool used to control financial data will be replaced by an improved and more powerful system, called CET for CERN Expenditure Tracking. The team in charge of CET. From left to right, sitting, Martyn Rankin, David McGlashan, standing, Per Gunnar Jonsson, James Purvis and Mikael Angberg. After 10 years of BHT at CERN, in order to face the challenges of the LHC era, and following the recommendations of the External Review Committee, the BHT application will be replaced by an improved and more powerful expenditure tracking tool called CET for CERN Expenditure Tracking. For those who are not familiar with it, the BHT, Budget Holders Toolkit, is a utility that provides a way to view CERN financial data. It is available for users who have access to at least one budget code. The new CET represents a tool that not only allows powerful analysis of the past, but also assists in forecasting the future. CET will offer significantly more functionality than BHT, including extended contract analysis, ...

  3. BABAR IFR Replacement R and D

    CERN Document Server

    Berry, M

    2003-01-01

    The Instrumented Flux Return (IFR) of the BaBar detector will soon need to be replaced by a more robust muon detection system. Scintillator bars with embedded Wavelength Shifting (WLS) fibers and Limited Streamer Tubes are two replacement technology options. The scintillator bars are tested for attenuation length; and causes for the large width of the Photo Multiplier Tube (PMT) signal are analyzed by Monte Carlo simulation. Cooling techniques for Avalanche Photo Diodes (APD) are investigated. The fairly high attenuation length coupled with the narrow PMT signal make the scintillator a viable option for a muon detecting system. Continuing work will focus on increasing timing resolution using an APD to read the signal from the WLS fibers, and investigating the lifetime of the APD. The ability to read a signal from the LST on external copper strips is tested and signals are found to be clearly distinguishable from noise. The voltage is compared to count rate to find that the optimal operating voltage for the LS...

  4. Replacement of CANDU reactivity Control Devices

    International Nuclear Information System (INIS)

    Ontario Hydro operates 20 AECL designed CANDU nuclear power reactors, some of which have been in service for 20 years. These pressurized heavy water, natural uranium fuelled reactors, ranging in size from 540 to 900 MWe, have continuously provided high capacity factors and low total electricity production costs, among the world's leaders in performance. CANDU's inherently have large cores and utilize a large number of diverse types of Reactivity Control Devices (RCDs) for fully automatic, continuous measurement and regulation of bulk power level as well as spatial uniformity of fission power in the core. The devices also control start-up and power manoeuvering. Other RCDs provide two independent systems of measurement and neutron absorber insertion for fast reactor shutdown. The continuous proper operation of RCDs obviously has significant influence on plant performance and availability, yet Ontario Hydro (OH) experience is that no significant loss of capacity factor has been attributed to the RCDs. This paper focuses on these Ontario Hydro replacement practices as they apply to RCD equipment in CANDU plants. The particular practices described relate to some extent to the unique aspects of CANDU plants, but the concepts of thorough planning, operational quality and teamwork are universally valid. Practicing safe, efficient component replacements contributes to reliable, cost effective plant operation. (author)

  5. BABAR IFR Replacement R and D

    International Nuclear Information System (INIS)

    The Instrumented Flux Return (IFR) of the BaBar detector will soon need to be replaced by a more robust muon detection system. Scintillator bars with embedded Wavelength Shifting (WLS) fibers and Limited Streamer Tubes are two replacement technology options. The scintillator bars are tested for attenuation length; and causes for the large width of the Photo Multiplier Tube (PMT) signal are analyzed by Monte Carlo simulation. Cooling techniques for Avalanche Photo Diodes (APD) are investigated. The fairly high attenuation length coupled with the narrow PMT signal make the scintillator a viable option for a muon detecting system. Continuing work will focus on increasing timing resolution using an APD to read the signal from the WLS fibers, and investigating the lifetime of the APD. The ability to read a signal from the LST on external copper strips is tested and signals are found to be clearly distinguishable from noise. The voltage is compared to count rate to find that the optimal operating voltage for the LST used is 4600V. Further studies will be conducted in strip readout and fabrication as well as in the optimal isobutane content in the gas mixture that flows through the tube

  6. Hormone replacement therapy: determinants of women's decisions.

    Science.gov (United States)

    Marmoreo, J; Brown, J B; Batty, H R; Cummings, S; Powell, M

    1998-03-01

    Hormone replacement therapy: determinants of women's decisions. The purpose of this qualitative study was to explore the decision-making process used by menopausal women initiating or remaining on hormone replacement therapy (HRT), stopping HRT, or never starting HRT. Eight focus groups, composed of women reflecting these categories, were conducted. Four major themes or spheres of influence emerged as important in the women's decision-making process: the woman's internal influence--the interface between her perceptions and feelings including the symptoms of menopause, the benefits realized by HRT usage, and the experiences of negative side effects; interpersonal relationships, including the patient-physician relationship, family, friends and information networks; external influences, such as ageism and sexism; and consequences resulting from whichever treatment decision was chosen. A new concept was elucidated called "weighted influence" to underscore the dynamic interplay among the spheres. As information about HRT continues to grow and change, an understanding and application of these spheres of influence can assist physicians in engaging in a dialogue with their patients that allows individual evaluation and application of this new information. PMID:9731166

  7. After Hip Replacement, Therapy At Home May Be Enough

    Science.gov (United States)

    ... nih.gov/medlineplus/news/fullstory_157609.html After Hip Replacement, Therapy at Home May Be Enough Finding ... Surgeons often recommend outpatient physical therapy to help hip replacement patients get moving again, but researchers report ...

  8. Protein Replacement Therapy Shows Promise in Treating Rare Skin Disorder

    Science.gov (United States)

    ... 1999 Spotlight on Research 2014 February 2014 (historical) Protein Replacement Therapy Shows Promise in Treating Rare Skin Disorder Replacing a protein that is crucial to ensuring that the skin’s ...

  9. District heating to replace an electrical installation

    OpenAIRE

    Serra Ramon, Maria Lourdes; Montañés Asenjo, Alba

    2008-01-01

    This project has been developed at the company Gavlegardarna. The company owns a large part of the buildings of Gävle and two of them are the objective of the project. Gavlegardana is highly concerned about the environment; for this reason, they cooperate on the subject with the energy management from their technical department. Gävle is one of the Swedish cities where the DH (district heating) network is distributed, arriving to most of the dwellings, industries and commerc...

  10. A diminishing population whose every cohort more than replaces itself

    OpenAIRE

    Robert Schoen; JONSSON, STEFAN H.

    2003-01-01

    We observe that a dynamic population model can have period fertility that is always below replacement and cohort fertility that is always above replacement. We ask whether such a paradoxical population will get larger or smaller, and show that it must become smaller. Cohort replacement does not imply population replacement, and emphasizing fertility timing and cohort fertility ignores the issue of relative cohort size. The resolution of this apparent paradox reinforces the importance of the l...

  11. Sustainable Building Operation

    DEFF Research Database (Denmark)

    Jensen, Jesper Ole

    2009-01-01

    practical experiences from Danish housing estates indicates that there are large potentials for energy savings by focusing on the operation of the buildings. We suggest that in order to achieve sustainability in the existing housing, renovation and operations should be seen as integrated parts and that...... sustainable building operation can pave the way for sustainable building renovation. This paper discusses the use of sustainability building operation in Danish housing estates: Which tools, methods and technologies is being used, where are the barriers and where are the potentials? We define sustainable...... sustainable building operation and a survey amongst building administrators from the private and the social housing sector. Our results show that there are many good examples on sustainable building operation in Danish housing estates, where local building managers, residents etc. have gained impressive...

  12. Building the Korogwe Laboratory

    DEFF Research Database (Denmark)

    Knudsen, Jakob; von Seidlein, Lorenz; Richard, Jean Pierre

    2011-01-01

    An illustrated description of the building of a biomedical research laboratory in Korogwe, Tanzania.......An illustrated description of the building of a biomedical research laboratory in Korogwe, Tanzania....

  13. Requirements for existing buildings

    DEFF Research Database (Denmark)

    Thomsen, Kirsten Engelund; Wittchen, Kim Bjarne

    2012-01-01

    This report collects energy performance requirements for existing buildings in European member states by June 2012.......This report collects energy performance requirements for existing buildings in European member states by June 2012....

  14. Better Buildings Challenge Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-06-01

    The Better Buildings Challenge is a national leadership initiative calling on corporate chief executive officers, university presidents, and state and local leaders to make a significant commitment to building energy efficiency.

  15. Environmental indicators for buildings

    DEFF Research Database (Denmark)

    Dammann, Sven

    Environmental Indicators for Buildings are studied using two different perspectives: with a technological, environmental scientific departing point and with a social scientific departing point. Different relevant groups in the building sector are identified and analysed, using the Social...

  16. Robotic buildings(s)

    NARCIS (Netherlands)

    Bier, H.H.

    2014-01-01

    Technological and conceptual advances in fields such as artificial intelligence, robotics, and material science have enabled robotic building to be in the last decade prototypically implemented. In this context, robotic building implies both physically built robotic environments and robotically supp

  17. Integrated Building Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Abstract: Building health management is an important part in running an efficient and cost-effective building. Many problems in a building’s system can go...

  18. Building Design & Construction - Sustainability

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-11-01

    Offers a brief history of green building; presents the results of a specially commissioned survey; and analyzes the chief trends, issues, and published research, based on interviews with dozens of experts and participants in green building.

  19. Comfort control in buildings

    CERN Document Server

    Castilla, Maria del Mar; Rodriguez, Francisco de Asis

    2014-01-01

    This book describes both concepts and development of advanced comfort control systems in buildings, with significant energy saving, and attention to thermal, visual and indoor air quality. The concepts are proven through real tests in a bioclimatic building.

  20. Energy performance in buildings

    International Nuclear Information System (INIS)

    The adoption of the building sector regulations strongly oriented to the energy sustainability becomes more effective, also on the economic plan, if placed by one spread of the energetic certification of the buildings

  1. Allegheny County Building Footprints

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset contains photogrammetrically compiled roof outlines of buildings. All near orthogonal corners are square. Buildings that are less than 400 square feet...

  2. Buildings interoperability landscape - Draft

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Dave B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Stephan, Eric G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Corbin, Charles D. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Widergren, Steven E. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2015-02-01

    Buildings are an integral part of our nation’s energy economy. The advancement in information and communications technology (ICT) has revolutionized energy management in industrial facilities and large commercial buildings. As ICT costs decrease and capabilities increase, buildings automation and energy management features are transforming the small-medium commercial and residential buildings sectors. A vision of a connected world in which equipment and systems within buildings coordinate with each other to efficiently meet their owners’ and occupants’ needs, and where buildings regularly transact business with other buildings and service providers (such as gas and electric service providers) is emerging. However, while the technology to support this collaboration has been demonstrated at various degrees of maturity, the integration frameworks and ecosystems of products that support the ability to easily install, maintain, and evolve building systems and their equipment components are struggling to nurture the fledging business propositions of their proponents.

  3. COMPUTER AIDED DESIGN OF REPLACEMENT SOLVENTS UNDER VARYING ENVIRONMENTAL CONSTRAINTS

    Science.gov (United States)

    There is a great need to replace many solvents that are commonly used by industry and the public, but whose continued use entails a number of human health and environmental risks. One problem hampering solvent replacement is the thought that replacement, particularly for environm...

  4. 14 CFR 21.9 - Replacement and modification articles.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Replacement and modification articles. 21.9... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS General § 21.9 Replacement and modification articles. (a) If a person knows, or should know, that a replacement or modification article is reasonably likely to...

  5. 25 CFR 700.187 - Utilization of replacement home benefits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Utilization of replacement home benefits. 700.187 Section 700.187 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Replacement Housing Payments § 700.187 Utilization of replacement home benefits. The...

  6. 21 CFR 870.3925 - Replacement heart valve.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Replacement heart valve. 870.3925 Section 870.3925...) MEDICAL DEVICES CARDIOVASCULAR DEVICES Cardiovascular Prosthetic Devices § 870.3925 Replacement heart valve. (a) Identification. A replacement heart valve is a device intended to perform the function of...

  7. New Firm Performance and the Replacement of Founder-CEOs

    DEFF Research Database (Denmark)

    Chen, Jing; Thompson, Peter

    2015-01-01

    We study the causes and consequences of the replacement of founder-CEOs in a sample of 4,172 Danish start-ups. We propose that founder-CEO replacement is driven in part by mismatches between business quality and founder ability. Our framework suggests that replacements are more likely among the...

  8. 9 CFR 82.15 - Replacement birds and poultry.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Replacement birds and poultry. 82.15...- EASE (END) AND CHLAMYDIOSIS Exotic Newcastle Disease (END) § 82.15 Replacement birds and poultry. Birds and poultry that have been destroyed because of a quarantine for END may not be replaced by birds...

  9. 30 CFR 56.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 56.12036 Section 56.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... § 56.12036 Fuse removal or replacement. Fuses shall not be removed or replaced by hand in an...

  10. 21 CFR 874.3450 - Partial ossicular replacement prosthesis.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Partial ossicular replacement prosthesis. 874.3450 Section 874.3450 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... replacement prosthesis. (a) Identification. A partial ossicular replacement prosthesis is a device intended...

  11. 21 CFR 874.3495 - Total ossicular replacement prosthesis.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Total ossicular replacement prosthesis. 874.3495 Section 874.3495 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... replacement prosthesis. (a) Identification. A total ossicular replacement prosthesis is a device intended...

  12. Biological Sciences Building

    OpenAIRE

    Kumaraswamy, Mohan

    2002-01-01

    One element of the CIVCAL project Web-based resources containing images, tables, texts and associated data on the construction of the Biological Sciences Building. The HKU Kadoorie Biological Sciences Building is an 11-storey reinforced concrete framed building with a structural steel arch roof. The building dimensions are approximately 60 metres x 30 metres. The estimated project cost for the superstructure construction (excluding the bored pile foundations) was about HK$ 400 million....

  13. Marine Building Technology

    OpenAIRE

    Westby, Ola

    2006-01-01

    This textbook is all about building of ships, platforms and other offshore installations. The geometry and functions of systems and structures are explained as an introduction to management and technology at shipyards and building sites. Both loadbearing structures, outfitting and installation of accommodation are included. Project management, production planning, cost calculations, building methods, discipline knowledge (welding, painting, insulation, mechanical, piping etc.), fabrication te...

  14. ICT Enhanced Buildings Potentials

    DEFF Research Database (Denmark)

    Christiansson, Per

    2007-01-01

    with focus on virtual building models support, new services and user environment definitions and development, virtual spaces and augmented reality, intelligent building components, application ontologies, and ICT systems integration to illustrate ICT enhanced buildings potentials and R&D needs.  ...

  15. Facilitating Collaborative Knowledge Building

    Science.gov (United States)

    Hmelo-Silver, Cindy E.; Barrows, Howard S.

    2008-01-01

    This article describes a detailed analysis of knowledge building in a problem-based learning group. Knowledge building involves increasing the collective knowledge of a group through social discourse. For knowledge building to occur in the classroom, the teacher needs to create opportunities for constructive discourse in order to support student…

  16. Replacement of Swiss "Attestations de fonctions"

    CERN Multimedia

    DG Unit

    2009-01-01

    The Swiss Permanent Mission has informed CERN that the "attestations de fonctions" issued to certain members of the personnel and the "attestations" issued to their family members will gradually be replaced by P-type "cartes de légitimation" (see specimen copies below). This card’s name, together with its more contemporary design compared with old-style "Attestations" issued in the 1970s, will make the holder’s daily life much easier, e.g. when crossing borders, renting accommodation or setting up a telephone line. The Users Office (PH Department) and the Cards Office (HR Department), which are responsible for handling requests for "cartes de légitimation", will provide information in due course on how they intend to organise the exchange of "attestations" (priority will be given to residents of Switzerland, in parti...

  17. Hormone replacement therapy and risk of glioma

    DEFF Research Database (Denmark)

    Andersen, Lene; Friis, Søren; Hallas, Jesper; Ravn, Pernille; Gaist, David

    2013-01-01

    nationwide setting. Methods: Using population-based registries we conducted a case-control study nested in the Danish female population. We identified all women aged 55-84 years with a first diagnosis of histologically verified brain glioma during 2000-2009. Using risk-set sampling, each case was matched on......Aim: Several studies indicate that use of hormone replacement therapy (HRT) is associated with an increased risk of intracranial meningioma, while associations between HRT use and risk of other brain tumors have been less explored. We investigated the influence of HRT use on the risk of glioma in a...... birth year to eight population controls. Ever use of HRT was defined as ≥2 HRT prescriptions and categorized according to type (oestrogens only, combined oestrogen-progestagen and progestagen only) and duration of use (...

  18. Segmental blood pressure after total hip replacement

    DEFF Research Database (Denmark)

    Gebuhr, Peter Henrik; Soelberg, M; Henriksen, Jens Henrik

    1992-01-01

    Twenty-nine patients due to have a total hip replacement had their systemic systolic and segmental blood pressures measured prior to operation and 1 and 6 weeks postoperatively. No patients had signs of ischemia. The segmental blood pressure was measured at the ankle and at the toes. A significant...... drop was found in all pressures 1 week postoperatively. The decrease followed the systemic pressure and was restored to normal after 6 weeks. In a group of six patients with preoperatively decreased ankle pressure, a significant transient further decrease in the ankle-toe gradient pressure was found on...... the operated side. None of the patients had symptoms from the lowered pressure. We conclude that in patients without signs of ischemia, the postoperative segmental pressure decrease is reversible and therefore not dangerous....

  19. Safety Features of the Replacement Research Reactor

    International Nuclear Information System (INIS)

    The paper presents a general description of the development and application of basic safety criteria and the implementation of specific safety features in the design of the 20 MW pool-type research reactor currently being built by INVAP for the Australian Nuclear Science and Technology Organisation (ANSTO). A summary of the results of the preliminary deterministic safety analysis and the probabilistic safety assessment prepared by INVAP on ANSTO's behalf are presented as part of demonstrating the robustness of the design to the wide range of postulated initiating events considered. The paper also briefly describes the licensing process with respect to the way in which the licensing and regulatory regime within Australia influenced the design of the replacement research reactor (RRR). In particular, the reasoning for safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator is described. (author)

  20. Modeling Regular Replacement for String Constraint Solving

    Science.gov (United States)

    Fu, Xiang; Li, Chung-Chih

    2010-01-01

    Bugs in user input sanitation of software systems often lead to vulnerabilities. Among them many are caused by improper use of regular replacement. This paper presents a precise modeling of various semantics of regular substitution, such as the declarative, finite, greedy, and reluctant, using finite state transducers (FST). By projecting an FST to its input/output tapes, we are able to solve atomic string constraints, which can be applied to both the forward and backward image computation in model checking and symbolic execution of text processing programs. We report several interesting discoveries, e.g., certain fragments of the general problem can be handled using less expressive deterministic FST. A compact representation of FST is implemented in SUSHI, a string constraint solver. It is applied to detecting vulnerabilities in web applications

  1. The Research of Artificial Cervical Disc Replacement

    Institute of Scientific and Technical Information of China (English)

    Zhao Zhua; Qiang Shenb

    2008-01-01

    Cervical arthroplasty after anterior decompression with insertion of a prosthetic total disc replacement has been suggested as an alternate to anterior cervical fusion. It develops quickly during recent years. Currently there are several cervical arthroplasty devices. Each device varies in terms of materials, range of motion and constraint. Early studies suggest that in the short term, the complication rate and efficacy is no worse than fusion surgery. Long-term results have not yet been reported. This review examines the current prostheses as well as discussing issues regarding indications and technique. It is hoped that an improvement of cervical arthroplasty occurs in terms of materials and design as spinal surgeons enter a new dines of the management of cervical spine disease.

  2. Material Science in Cervical Total Disc Replacement.

    Science.gov (United States)

    Pham, Martin H; Mehta, Vivek A; Tuchman, Alexander; Hsieh, Patrick C

    2015-01-01

    Current cervical total disc replacement (TDR) designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti), and cobalt-chrome (CoCr). These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation. PMID:26523281

  3. Material Science in Cervical Total Disc Replacement

    Directory of Open Access Journals (Sweden)

    Martin H. Pham

    2015-01-01

    Full Text Available Current cervical total disc replacement (TDR designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti, and cobalt-chrome (CoCr. These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation.

  4. Hormonal replacement therapy and gynecological cancer.

    Science.gov (United States)

    Onnis, A; Marchetti, M

    1999-01-01

    The problem of quality of life and lifestyle in elderly women is today a very important social problem all over the world but particularly in rich western countries. Life expectancy of the population will be longer and longer in the future and for both females and males the biological involution correlated with the aging process must be delayed. The gonadal hormones stimulate the healthy state of the entire body (heart, skin, brain, bones, urogenital apparatus and so on) and consequently hormonal replacement therapy (HRT) is mandatory. In women the biological clock of menopause allows us to intervene at the right time, with personalized estrogenic, estroprogestinic or estroandrogenic treatments. Health benefits and groundless risks allow today a careful hormonal management even in women treated for gynaecological cancers (breast and endometrium as well). PMID:10412612

  5. Drift sight replacement in the U-2

    Science.gov (United States)

    Bialecki, Lawrence J.

    2005-05-01

    When first deployed in the mid 1950s, the U-2 had an inverted periscope (Drift Sight) to provide the pilot a view of the area below the aircraft. During a recent glass cockpit upgrade, this periscope was removed. This paper discusses: " The development activity leading up to flight test of an Electro Optical Viewsight System (EOVS) replacement for the Drift Sight. The impact and design consideration of using an inexpensive Commercial Off the Shelf (COTS) cameral module, originally designed for small hand held video cameras, " The process used to develop the basic requirements and how early input from the user community lead to an effective design (e.g.., Hand Grip), " The ruggedization techniques necessary to ensure the camera would meet the vibration, thermal, and Electro Magnetic Interface (EMI) environment, " Actual system performance data, " Growth "hooks" and how they were accommodated in a firm fixed price contract.

  6. Replacement divider plate performance under LOCA loading

    Energy Technology Data Exchange (ETDEWEB)

    Huynk, H.M. [Quebec Hydro, Montreal, PQ (Canada); MClellan, G.H.; Schneider, W.G. [Babcock and Wilcox, Cambridge, ON (Canada)

    1997-07-01

    A primary divider plate in a nuclear steam generator is required to perform its partitioning function with a minimum of cross leakage, without degradation in operating performance and without loss of structural integrity resulting from normal and accident loading. The design of the replacement divider plate for normal operating conditions is discussed in some detail in reference 1 and 2. This paper describes the structural response of the replacement divider plate to the severe loading resulting from a burst primary pipe. The loads for which the divider plate structural performance must be evaluated are mild to severe differential pressure transients resulting from several postulated sizes and types of pipe break scenarios. In the unlikely event of a severe Loss of Coolant Accident (LOCA) the divider plate or parts thereof must not exit the steam generator nor completely block the outlet nozzle. For the milder LOCA loads, the integrity of the divider plate and seat bars must be maintained. Analysis for the milder LOCA loads was carried out employing a conservative approach which ignores the actual interaction between the structure and the primary fluid. For these load cases it was shown that the divider plate does not become disengaged from the seat bars. For the more severe pipe breaks, the thermal-hydraulic analysis was coupled iteratively with the structural analysis, thereby taking into account divider plate deformation, in order to obtain a better prediction of the behaviour of the divider plate. In this manner substantial reduction in divider plate response to the more severe LOCA loading was achieved. It has been shown that, for the case of a postulated large LOCA (100% reactor inlet header), the disengagement of the divider plate from the seat bars resulted in an opening smaller than 1% of the divider plate area. (author)

  7. Neonatal varicella pneumonia, surfactant replacement therapy

    Directory of Open Access Journals (Sweden)

    Mousa Ahmadpour-kacho

    2015-12-01

    Full Text Available Background: Chickenpox is a very contagious viral disease that caused by varicella-zoster virus, which appears in the first week of life secondary to transplacental transmission of infection from the affected mother. When mother catches the disease five days before and up to two days after the delivery, the chance of varicella in neonate in first week of life is 17%. A generalized papulovesicular lesion is the most common clinical feature. Respiratory involvement may lead to giant cell pneumonia and respiratory failure. The mortality rate is up to 30% in the case of no treatment, often due to pneumonia. Treatment includes hospitalization, isolation and administration of intravenous acyclovir. The aim of this case report is to introduce the exogenous surfactant replacement therapy after intubation and mechanical ventilation for respiratory failure in neonatal chickenpox pneumonia and respiratory distress. Case Presentation: A seven-day-old neonate boy was admitted to the Neonatal Intensive Care Unit at Amirkola Children’s Hospital, Babol, north of Iran, with generalized papulovesicular lesions and respiratory distress. His mother has had a history of Varicella 4 days before delivery. He was isolated and given supportive care, intravenous acyclovir and antibiotics. On the second day, he was intubated and connected to mechanical ventilator due to severe pneumonia and respiratory failure. Because of sever pulmonary involvement evidenced by Chest X-Ray and high ventilators set-up requirement, intratracheal surfactant was administered in two doses separated by 12 hours. He was discharged after 14 days without any complication with good general condition. Conclusion: Exogenous surfactant replacement therapy can be useful as an adjunctive therapy for the treatment of respiratory failure due to neonatal chickenpox.

  8. Testosterone replacement therapy for older men

    Directory of Open Access Journals (Sweden)

    Stephen E Borst

    2007-01-01

    Full Text Available Stephen E Borst, Thomas MulliganGeriatrics Research, Education, and Clinical Center, North Florida/South Georgia Veterans Health System, Gainesville, FL, USAAbstract: Despite intensive research on testosterone therapy for older men, important questions remain unanswered. The evidence clearly indicates that many older men display a partial androgen deficiency. In older men, low circulating testosterone is correlated with low muscle strength, with high adiposity, with insulin resistance and with poor cognitive performance. Testosterone replacement in older men has produced benefits, but not consistently so. The inconsistency may arise from differences in the dose and duration of testosterone treatment, as well as selection of the target population. Generally, studies reporting anabolic responses to testosterone have employed higher doses of testosterone for longer treatment periods and have targeted older men whose baseline circulating bioavailable testosterone levels were low. Most studies of testosterone replacement have reported anabolic that are modest compared to what can be achieved with resistance exercise training. However, several strategies currently under evaluation have the potential to produce greater anabolic effects and to do so in a safe manner. At this time, testosterone therapy can not be recommended for the general population of older men. Older men who are hypogonadal are at greater risk for the catabolic effects associated with a number of acute and chronic medical conditions. Future research is likely to reveal benefits of testosterone therapy for some of these special populations. Testosterone therapy produces a number of adverse effects, including worsening of sleep apnea, gynecomastia, polycythemia and elevation of PSA. Efficacy and adverse effects should be assessed frequently throughout the course of therapy.Keywords: aging, testosterone, hypogonadism, physical function

  9. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory

    International Nuclear Information System (INIS)

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL's existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required

  10. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  11. Building Order in the Building Company Organization

    OpenAIRE

    Krivdová, Magdaléna

    2013-01-01

    The aim of the thesis is to describe an organization of a building order, and to show its key phases. The individual phases of how a order is completed in a company are shown on practical examples. The first two chapters deal with the current situation of today's construction industry; consequently, the reasons for introducing the principles of project management into the construction business practice are mentioned. The third chapter is devoted to the description of a building order. It...

  12. Urban chaos and replacement dynamics in nature and society

    Science.gov (United States)

    Chen, Yanguang

    2014-11-01

    Replacements resulting from competition are ubiquitous phenomena in both nature and society. The evolution of a self-organized system is always a physical process substituting one type of components for another type of components. A logistic model of replacement dynamics has been proposed in terms of technical innovation and urbanization, but it fails to arouse widespread attention in the academia. This paper is devoted to laying the foundations of general replacement principle by using analogy and induction. The empirical base of this study is urban replacement, including urbanization and urban growth. The sigmoid functions can be employed to model various processes of replacement. Many mathematical methods such as allometric scaling and head/tail breaks can be applied to analyzing the processes and patterns of replacement. Among varied sigmoid functions, the logistic function is the basic and the simplest model of replacement dynamics. A new finding is that replacement can be associated with chaos in a nonlinear system, e.g., urban chaos is just a part of replacement dynamics. The aim of developing replacement theory is at understanding complex interaction and conversion. This theory provides a new way of looking at urbanization, technological innovation and diffusion, Volterra-Lotka’s predator-prey interaction, man-land relation, and dynastic changes resulting from peasant uprising, and all that. Especially, the periodic oscillations and chaos of replacement dynamics can be used to explain and predict the catastrophic occurrences in the physical and human systems.

  13. Integrated building design

    Science.gov (United States)

    Sanguinetti, Jennifer

    2005-04-01

    For many years, building design has been a very linear process with owners speaking to architects who then design building shells that they pass along to sub-consultants who must fit their systems into the allotted spaces. While this process has some advantages, it provides little opportunity to optimize systems based on such factors as energy use or occupant comfort. This presentation will focus on the evolution and implications of integrated building design, a method that has provided greater opportunities for interaction between design disciplines and with building users early on in the design process. Integration has resulted in buildings that are more sustainable than typical buildings and that can respond better to the needs of the owner and users. Examples of the application of the process and the resulting buildings will be presented from the view of a design engineer with experience of both processes. Specifically, the potential contribution of an acoustical consultant in the integrated process will be explored.

  14. Commercial Buildings Characteristics, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-29

    Commercial Buildings Characteristics 1992 presents statistics about the number, type, and size of commercial buildings in the United States as well as their energy-related characteristics. These data are collected in the Commercial Buildings Energy Consumption Survey (CBECS), a national survey of buildings in the commercial sector. The 1992 CBECS is the fifth in a series conducted since 1979 by the Energy Information Administration. Approximately 6,600 commercial buildings were surveyed, representing the characteristics and energy consumption of 4.8 million commercial buildings and 67.9 billion square feet of commercial floorspace nationwide. Overall, the amount of commercial floorspace in the United States increased an average of 2.4 percent annually between 1989 and 1992, while the number of commercial buildings increased an average of 2.0 percent annually.

  15. The new library building at the University of Texas Health Science Center at San Antonio.

    Science.gov (United States)

    Kronick, D A; Bowden, V M; Olivier, E R

    1985-04-01

    The new University of Texas Health Science Center at San Antonio Library opened in June 1983, replacing the 1968 library building. Planning a new library building provides an opportunity for the staff to rethink their philosophy of service. Of paramount concern and importance is the need to convey this philosophy to the architects. This paper describes the planning process and the building's external features, interior layouts, and accommodations for technology. Details of the move to the building are considered and various aspects of the building are reviewed. PMID:3995205

  16. Decreased bio-inhibition of building materials due to transport of biocides

    OpenAIRE

    Erich, S.J.F.; Mendoza, S.M.; Floor, W.; Hermanns, S.P.M.; Homan, W.J.; Adan, O.C.G.

    2011-01-01

    Bio-inhibition of buildings and structures is an important issue. In many cases building materials have biocides added to prevent growth of micro-organisms. Growth of microorganisms on building materials has several negative effects; (1) Aesthetic damage, e.g. fungi, algae grow on the material, resulting in early replacement and high cleaning costs, (2) Material damage, and (3) Health problems. However, current legislation forces manufacturers to reduce the biocide load, which requires manufa...

  17. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Directory of Open Access Journals (Sweden)

    Michael D D'Emic

    Full Text Available BACKGROUND: Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. METHODOLOGY/PRINCIPAL FINDINGS: We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days. Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. CONCLUSIONS/SIGNIFICANCE: Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size, and derived titanosaurs and

  18. Rapid technique for determining building material radioactivity

    International Nuclear Information System (INIS)

    Rapid technique for determining building material radioactivity graphically, using nomogram of known uranium (226Ra), thorium (232Th), potassium contents is suggested. Nomogram usage permits to replace labour-consuming calculations of radionuclide specific activity by formula with simple rule imposition. Determination errors don't exceed 1-2%. The nomogram may be easily constructed selecting ranges of radionuclide concentration variation ranges, which are the most characteristic for the work region, and calculating scale values for U, Th and K by formula. Distance from uranium activity scale to U and Th total activity scale as well as scale factor of total specific activity are calculated by formula

  19. Status of the beryllium replacement project

    International Nuclear Information System (INIS)

    Currently, beryllium (Be) is used as the filler metal for brazing appendages on the sheaths of CANDU® fuel elements. Because of its toxicity, occupational exposure limits for Be are being reduced to very low levels, resulting in significant challenges to CANDU® fuel fabricators. The CANDU® Owners Group (COG) initiated a test program to identify a filler material to replace Be and confirm that the brazed joints meet the established technical requirements for CANDU® fuel. Together with eliminating health risks associated with the use of Be, the industry needs to be assured that continuation of fuel supply remains unaffected and that fuel fabrication processes continue to comply with health and safety standards. A literature survey of studies on brazing and joining of Zircaloy identified potential filler materials that can meet or exceed existing design requirements of the brazed joint, including the required mechanical, microstructural, corrosion resistance, and irradiation properties equivalent to those obtained with Be as braze material. Candidate materials were evaluated against several criteria, including manufacturability, melting point, wettability, mechanical properties, corrosion resistance, effect on neutron economy, potential activation products, and interaction with fuel channels and other related disciplines. This exercise resulted in a list of promising candidate materials that were recommended for the first phase of testing. These materials include stainless steel (304 or 316), Al-Si, Ni-P, and Zr-Mn alloys. To allow a CANDU® utility have sufficient confidence in considering implementation of a different braze filler material, a Be Replacement Test Program, involving out-reactor and in-reactor tests, is being undertaken as a collaborative endeavour by the Canadian nuclear industry. The out-reactor tests consist of: a constructability assessment to determine the material’s suitability with current fuel manufacturing methods; evaluation of

  20. Building for animal production

    International Nuclear Information System (INIS)

    In order to limit the radiation dose to persons working with animal husbandry in severe fallout situations, it was considered necessary to make an inventory of the Swedish livestock buildings as to number, location, use and size. These data as well as data on geometry of buildings, building material and thickness of the material in walls and roofs are given in the present work. On the basis of the mentioned data, calculations were made of the shielding factors of different types of livestock buildings. The collected data can also be used in preparedness planning in relation to housing facilities for livestock and location and size of animal production in situations of crises or war. The calculations show shielding factors for different types of livestock buildings of normal ground area within the range of 0.18-0.71. The higher value indicates a fairly poor shielding effect. The inventory and the calculations show that in those regions in Sweden where the main part of the livestock is managed, the types of buildings are, however, characterized by radiation shielding factors of 0.3-0.4. Calculation were also made of the radiation level inside the buildings following decontamination of roofs or of surrounding ground. Ground decontamination only, i.e., removal of the upper contaminated surface layer, will reduce the radiation level inside the building. For most buildings the radius of the surrounding area to be decontaminated has to be 15-30 times larger than the width of the building in order to achieve a 50 percentage reduction of the radiation level inside the building. For buildings of medium or large size and with thick walls the radiation contribution from the roof is greater than the radiation from the ground, and regardless of the size of the ground areas decontaminated the radiation level inside these buildings will only be reduced by 20-30%. 15 refs, 11 figs, 14 tabs

  1. Major component replacement projects-planning and installation experience

    International Nuclear Information System (INIS)

    In many circumstances component replacement is the most feasible means of resolving problems associated with Alloy 600. While advancements in repair approaches have made significant progress, replacement can offer many advantages. Steam Generator (SG) replacements, and later Reactor Vessel Closure Head (RVCH) replacements, have been prominent for over a decade, when installation practices have improved to reduce not only cost, but also outage time and dose. Framatome ANP, an AREVA and Siemens company, performed 40 SG and 65 RVCH replacement projects worldwide. The company has shared lessons learned from a few previous replacement projects at previous industry conferences. Our major evolution in these replacements is our capability to offer our customers the management of an extended scope of work. Major applications shall be implemented in the next SG 'integrated' replacements in France, as implemented in the US Turkey Point Unit 3 replacement project in the Fall of 2004. This was a full-scope single-vendor project, with installation including RVCH, control rod drive mechanisms (CRDMs) and integrated head assembly (IHA). Framatome ANP will provide a synopsis of this outage, as well as lessons learned. In 2005, Framatome ANP will perform the first U.S. pressurizer replacement in a Combustion Engineering plant. Experience gained with the installation of steam generators and RV heads will serve as the model to successfully install the new CE pressurizer. Preparations for the pressurizer installation will be outlined. (authors)

  2. What drives replacement goods at the micro level? What Drives Replacement Goods at the Micro Level?

    OpenAIRE

    Viviana Fernández

    2001-01-01

    Technological innovations have contributed over the years to an increasing stock of durable goods -those products that are not immediately consumed but provide a stream of services over a long period of time. Indeed, virtually every household in a modern economy owns a refrigerator, a personal computer and an automobile. Given the inter-temporal nature of replacement decisions, the existing literature has resorted to the technique of dynamic programming, and most recently to the theory of sto...

  3. Global Ductility of Dual Steel Frames with Replaceable Dissipative Shear Walls

    Directory of Open Access Journals (Sweden)

    Neagu Calin

    2015-09-01

    Full Text Available The paper presents the results of a numerical program that was used to investigate the seismic performance of dual steel frames with dissipative shear walls. Nonlinear static and dynamic analyses were employed in order to evaluate the global ductility and the q factor for a twelve story building. The influence of the q factor on the estimated level of damage and post-earthquake intervention strategy was investigated. The dynamic analyses were conducted using two groups of accelerograms, selected to match the response spectra of two types of grounds. The numerical models were validated against experimental tests. The results show that q factor values adopted in design influence the level of damage. If re-centering capacity is properly controlled by design, the replacement of damaged walls can minimize the time and cost of intervention, thus supporting disaster resilience of buildings

  4. Replacement of Swiss "Attestations de fonctions"

    CERN Multimedia

    DG Unit

    2009-01-01

    The Swiss Permanent Mission has informed CERN that the "attestations de fonctions" issued to certain members of the personnel and the "attestations" issued to their family members will gradually be replaced by P-type "cartes de légitimation" (see specimen copies in the printed Bulletin). This card’s name, together with its more contemporary design compared with old-style "Attestations" issued in the 1970s, will make the holder’s daily life much easier, e.g. when crossing borders, renting accommodation or setting up a telephone line. The Users Office (PH Department) and the Cards Office (HR Department), which are responsible for handling requests for "cartes de légitimation", will provide information in due course on how they intend to organise the exchange of "attestations" (priority will be given to residents of Switzerland, in particular those requiring a visa for the Schengen area). In this context, we remind you that the Swiss Permanent Mission is systematically in...

  5. Analysis for SG replacement and power uprating

    International Nuclear Information System (INIS)

    To document and license the increase of Krsko Nuclear Power Plant (NPP) power to 2000 MWt with replaced steam generator (RSG) , an exhaustive program of analyses has been conducted. It also covers operation in a range of reactor coolant temperatures, SG tube plugging level of up to 5% and cycles durations of 12 to 18 months. As far as feasible, the same methodologies/licensing basis, as existed before, have been followed. R.G. 1.70 rev.3 was observed for the accident analyses. A few changes in methodologies/licensing basis have however been introduced. They include Leak-Before- Break studies to exclude large break LOCA dynamic effects. Throughout the work, emphasis has consistently been placed on limiting plant modifications as far as feasible. Work has been documented along the project in work reports. Those have been reviewed by one or several authorized institutions and by SNSA. Work has been scrutinized by the reviewers to the minute detail, including non safety related parts. Results of the analyses being acceptable and, this acceptability being validated by a comprehensive licensing process, operation of Krsko NPP at 2000 MWt has been fully verified to be safe. (author)

  6. Facility requirements for a NRU replacement

    International Nuclear Information System (INIS)

    The Advanced MAPLE (Multipurpose Applied Physics Lattice Experiment) research reactor is a multipurpose, high-flux reactor concept that has been proposed as a possible future replacement for the NRU (National Research Universal) research reactor at AECL Research - Chalk River. This paper describes the presently envisaged facility requirements for the Advanced MAPLE research reactor as determined by a preliminary assessment of the needs expressed by experimental users. The large number of research reactor facility requirements identified in this study suggests that Canada will continue to need a state-of-the-art neutron source equivalent to or surpassing the capabilities of the present NRU reactor. Most of the research activities identified represent a continuation of programs presently underway in NRU, but they would benefit from the enhanced capabilities that an Advanced MAPLE design could provide. Probably the most pressing Canadian neutron research needs are for a high fast flux materials irradiation facility to support the CANDU power reactor program and for a cold neutron source to support basic research. The Advanced MAPLE design approach offers the prospect of enhanced cost effectiveness through the achievement of higher flux levels than NRU at a lower total thermal power. The needs of all the identified applications could likely be met with a single Advanced MAPLE research reactor facility, although probably not simultaneously. 11 refs., 2 figs

  7. MRI after patellofemoral replacement: The preserved compartments

    Energy Technology Data Exchange (ETDEWEB)

    Heyse, Thomas J., E-mail: heyse@med.uni-marburg.de [Department of Orthopedics and Rheumatology, University Hospital Marburg, Baldingerstrasse, 35043 Marburg (Germany); Figiel, Jens [Department of Radiology, University Hospital Marburg, Marburg (Germany); Hähnlein, Ulrike [Department of Orthopedics and Rheumatology, University Hospital Marburg, Baldingerstrasse, 35043 Marburg (Germany); Timmesfeld, Nina [Institute for Medical Biometry and Epidemiology, Marburg (Germany); Lakemeier, Stefan; Schofer, Markus D.; Fuchs-Winkelmann, Susanne; Efe, Turgay [Department of Orthopedics and Rheumatology, University Hospital Marburg, Baldingerstrasse, 35043 Marburg (Germany)

    2012-09-15

    Introduction: The aim of this study was to assess the reproducibility of magnet resonance imaging (MRI) analysis of preserved anatomic structures of the knee after patellofemoral replacement (PFR). It was hypothesized that evaluation of cartilage, ligaments, meniscus and tendons would result in high inter-observer reliability after PFR. Material and methods: MRI, tailored to reduce metallic artefacts of the knee, after PFR was performed in seven patients. Two independent investigators evaluated cartilage, menisci, collateral and cruciate ligaments, the quadriceps and patellar tendons and the presence of joint effusion. The reviewers used a five-point scale to give a degree of confidence to their evaluation of each parameter. Inter-observer reliability was determined by calculation of Cohen's Kappas. Results: Artefact provoked by the implants was not observed. For all assessed structures, there was excellent inter-observer reliability, with high Cohen's Kappas. There were also high levels of inter-observer agreement and observer confidence in the evaluation of cartilage, meniscus, tendons, ligaments and joint effusion. Conclusion: Tailored MRI allows reproducible analysis of the preserved knee joint structures after PFR. It might prove helpful in assessment of painful knee joints after PFR.

  8. Nonclinical Development of BCG Replacement Vaccine Candidates.

    Science.gov (United States)

    Velmurugan, Kamalakannan; Grode, Leander; Chang, Rosemary; Fitzpatrick, Megan; Laddy, Dominick; Hokey, David; Derrick, Steven; Morris, Sheldon; McCown, David; Kidd, Reginald; Gengenbacher, Martin; Eisele, Bernd; Kaufmann, Stefan H E; Fulkerson, John; Brennan, Michael J

    2013-01-01

    The failure of current Mycobacterium bovis bacille Calmette-Guérin (BCG) vaccines, given to neonates to protect against adult tuberculosis and the risk of using these live vaccines in HIV-infected infants, has emphasized the need for generating new, more efficacious and safer replacement vaccines. With the availability of genetic techniques for constructing recombinant BCG (rBCG) strains containing well-defined gene deletions or insertions, new vaccine candidates are under evaluation at both the preclinical and clinical stages of development. Since most BCG vaccines in use today were evaluated in clinical trials decades ago and are produced by outdated processes, the development of new BCG vaccines offers a number of advantages that include a modern well-defined manufacturing process along with state-of-the-art evaluation of safety and efficacy in target populations. We provide a description of the preclinical development of two novel rBCGs, VPM1002 that was constructed by adding a modified hly gene coding for the protein listeriolysin O (LLO) from Listeria monocytogenes and AERAS-422, which carries a modified pfoA gene coding for the protein perfringolysin O (PFO) from Clostridium perfringens, and three genes from Mycobacterium tuberculosis. Novel approaches like these should be helpful in generating stable and effective rBCG vaccine candidates that can be better characterized than traditional BCG vaccines. PMID:26343962

  9. Nonclinical Development of BCG Replacement Vaccine Candidates

    Directory of Open Access Journals (Sweden)

    Bernd Eisele

    2013-04-01

    Full Text Available The failure of current Mycobacterium bovis bacille Calmette–Guérin (BCG vaccines, given to neonates to protect against adult tuberculosis and the risk of using these live vaccines in HIV-infected infants, has emphasized the need for generating new, more efficacious and safer replacement vaccines. With the availability of genetic techniques for constructing recombinant BCG (rBCG strains containing well-defined gene deletions or insertions, new vaccine candidates are under evaluation at both the preclinical and clinical stages of development. Since most BCG vaccines in use today were evaluated in clinical trials decades ago and are produced by outdated processes, the development of new BCG vaccines offers a number of advantages that include a modern well-defined manufacturing process along with state-of-the-art evaluation of safety and efficacy in target populations. We provide a description of the preclinical development of two novel rBCGs, VPM1002 that was constructed by adding a modified hly gene coding for the protein listeriolysin O (LLO from Listeria monocytogenes and AERAS-422, which carries a modified pfoA gene coding for the protein perfringolysin O (PFO from Clostridium perfringens, and three genes from Mycobacterium tuberculosis. Novel approaches like these should be helpful in generating stable and effective rBCG vaccine candidates that can be better characterized than traditional BCG vaccines.

  10. Process optimized minimally invasive total hip replacement

    Directory of Open Access Journals (Sweden)

    Philipp Gebel

    2012-02-01

    Full Text Available The purpose of this study was to analyse a new concept of using the the minimally invasive direct anterior approach (DAA in total hip replacement (THR in combination with the leg positioner (Rotex- Table and a modified retractor system (Condor. We evaluated retrospectively the first 100 primary THR operated with the new concept between 2009 and 2010, regarding operation data, radiological and clinical outcome (HOOS. All surgeries were perfomed in a standardized operation technique including navigation. The average age of the patients was 68 years (37 to 92 years, with a mean BMI of 26.5 (17 to 43. The mean time of surgery was 80 min. (55 to 130 min. The blood loss showed an average of 511.5 mL (200 to 1000 mL. No intra-operative complications occurred. The postoperative complication rate was 6%. The HOOS increased from 43 points pre-operatively to 90 (max 100 points 3 months after surgery. The radiological analysis showed an average cup inclination of 43° and a leg length discrepancy in a range of +/- 5 mm in 99%. The presented technique led to excellent clinic results, showed low complication rates and allowed correct implant positions although manpower was saved.

  11. Alternatives to proposed replacement production reactors

    International Nuclear Information System (INIS)

    To insure adequate supplies of plutonium and tritium for defense purposes, an independent evaluation was made by Los Alamos National Laboratory of the numerous alternatives to the proposed replacement production reactors (RPR). This effort concentrated on the defense fuel cycle operation and its technical implications in identifying the principal alternatives for the 1990s. The primary options were identified as (1) existing commercial reactors, (2) existing and planned government-owned facilities (not now used for defense materials production), and (3) other RPRs (not yet proposed) such as CANDU or CANDU-type heavy-water reactors (HWR) for both plutonium and tritium production. The evaluation considered features and differences of various options that could influence choice of RPR alternatives. Barring a change in the US approach to civilian and defense fuel cycles and precluding existing commercial reactors at government-owned sites, the most significant alternatives were identified as a CANDU-type HWR at Savannah River Plant (SRP) site or the Three Mile Island commercial reactor with reprocessing capability at Barnwell Nuclear Fuel Plant and at SRP

  12. Gray component replacement using color mixing models

    Science.gov (United States)

    Kang, Henry R.

    1994-05-01

    A new approach to the gray component replacement (GCR) has been developed. It employs the color mixing theory for modeling the spectral fit between the 3-color and 4-color prints. To achieve this goal, we first examine the accuracy of the models with respect to the experimental results by applying them to the prints made by a Canon Color Laser Copier-500 (CLC-500). An empirical halftone correction factor is used for improving the data fitting. Among the models tested, the halftone corrected Kubelka-Munk theory gives the closest fit, followed by the halftone corrected Beer-Bouguer law and the Yule-Neilsen approach. We then apply the halftone corrected BB law to GCR. The main feature of this GCR approach is based on the spectral measurements of the primary color step wedges and a software package implementing the color mixing model. The software determines the amount of the gray component to be removed, then adjusts each primary color until a good match of the peak wavelengths between the 3-color and 4-color spectra is obtained. Results indicate that the average (Delta) Eab between cmy and cmyk renditions of 64 color patches is 3.11 (Delta) Eab. Eighty-seven percent of the patches has (Delta) Eab less than 5 units. The advantage of this approach is its simplicity; there is no need for the black printer and under color addition. Because this approach is based on the spectral reproduction, it minimizes the metamerism.

  13. 3D Model of Surfactant Replacement Therapy

    Science.gov (United States)

    Grotberg, James; Tai, Cheng-Feng; Filoche, Marcel

    2015-11-01

    Surfactant Replacement Therapy (SRT) involves instillation of a liquid-surfactant mixture directly into the lung airway tree. Though successful in neonatal applications, its use in adults had early success followed by failure. We present the first mathematical model of 3D SRT where a liquid plug propagates through the tree from forced inspiration. In two separate modeling steps, the plug first deposits a coating film on the airway wall which subtracts from its volume, a ``coating cost''. Then the plug splits unevenly at the airway bifurcation due to gravity. The steps are repeated until a plug ruptures or reaches the tree endpoint alveoli/acinus. The model generates 3D images of the resulting acinar distribution and calculates two global indexes, efficiency and homogeneity. Simulating published literature, the earlier successful adult SRT studies show comparatively good index values, while the later failed studies do not. Those unsuccessful studies used smaller dose volumes with higher concentration mixtures, apparently assuming a well mixed compartment. The model shows that adult lungs are not well mixed in SRT due to the coating cost and gravity effects. Returning to the higher dose volume protocols could save many thousands of lives annually in the US. Supported by NIH Grants HL85156, HL84370 and Agence Nationale de la Recherche, ANR no. 2010-BLAN-1119-05.

  14. Licensing of the Australian replacement research reactor

    International Nuclear Information System (INIS)

    The Australian Nuclear Science and Technology Organisation (ANSTO)'s Replacement Research Reactor has been submitted to a comprehensive licensing process of which peer review has been a fundamental part. Following Australian Regulation, an application for a site licence was the first step supported by an Environmental Impact Statement approved by The Minister for the Environment and Heritage, and a Reference Accident Analysis. After the site licence had been granted and the contract awarded to the Designer and Constructor, INVAP S.E:, a 2500 page Preliminary Safety Analysis Report was submitted by ANSTO to the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA), which conducted its review. ARPANSA requested that the PSAR be also reviewed by an experts mission from the International Atomic Energy Agency. The PSAR was also reviewed by the Argentine Regulatory Body, it was submitted to public examination in Australia and it was reviewed by international experts hired as consultants by several Australian organisations. A public forum was also held in Sydney. The Regulator, the applicant and the Designer-Constructor maintained constant interaction during the whole process, so that questions, comments and observations that arose from the review of the PSAR were fed back to the designers. This process allowed for a robust, safe design enriched by the results of the safety analysis and review process. (author)

  15. Can smartwatches replace smartphones for posture tracking?

    Science.gov (United States)

    Mortazavi, Bobak; Nemati, Ebrahim; VanderWall, Kristina; Flores-Rodriguez, Hector G; Cai, Jun Yu Jacinta; Lucier, Jessica; Naeim, Arash; Sarrafzadeh, Majid

    2015-01-01

    This paper introduces a human posture tracking platform to identify the human postures of sitting, standing or lying down, based on a smartwatch. This work develops such a system as a proof-of-concept study to investigate a smartwatch's ability to be used in future remote health monitoring systems and applications. This work validates the smartwatches' ability to track the posture of users accurately in a laboratory setting while reducing the sampling rate to potentially improve battery life, the first steps in verifying that such a system would work in future clinical settings. The algorithm developed classifies the transitions between three posture states of sitting, standing and lying down, by identifying these transition movements, as well as other movements that might be mistaken for these transitions. The system is trained and developed on a Samsung Galaxy Gear smartwatch, and the algorithm was validated through a leave-one-subject-out cross-validation of 20 subjects. The system can identify the appropriate transitions at only 10 Hz with an F-score of 0.930, indicating its ability to effectively replace smart phones, if needed. PMID:26506354

  16. Aortic regurgitation after transcatheter aortic valve replacement.

    Science.gov (United States)

    Werner, Nikos; Sinning, Jan-Malte

    2014-01-01

    Paravalvular aortic regurgitation (AR) negatively affects prognosis following transcatheter aortic valve replacement (TAVR). As transcatheter heart valves (THV) are anchored using a certain degree of oversizing at the level of the aortic annulus, incomplete stent frame expansion because of heavily annular calcifications, suboptimal placement of the prosthesis, and/or annulus-prosthesis size-mismatch can contribute to paravalvular AR with subsequent increased mortality risk. Echocardiography is essential to differentiate between transvalvular and paravalvular AR and to further elucidate the etiology of AR during the procedure. However, because echocardiographic quantification of AR in TAVR patients remains challenging, especially in the implantation situation, a multimodal approach to the evaluation of AR with use of hemodynamic measurements and imaging modalities is useful to precisely quantify the severity of AR immediately after valve deployment. "Next-generation" THVs are already on the market and first results show that paravalvular AR related to design modifications (eg, paravalvular space-fillers, full repositionability) are rarely seen in these valve types.  PMID:24632758

  17. Licensing of ANSTO's Replacement Research Reactor

    International Nuclear Information System (INIS)

    This paper presents a general description of the licensing of the 20 MW Pool-type Replacement Research Reactor (RRR) currently being built by the Australian Nuclear Science and Technology Organisation (ANSTO) at their Lucas Heights site. The following aspects will be addressed: 1) The influence of ARPANSA's (the Australian regulator) Regulatory Assessment Principles and Design Criteria on the design of the RRR. 2) The Site Licence Application, including the EIS and the supporting siting documentation. 3) The Construction Licence Application, including the PSAR and associated documentation. 4) The review process, including the IAEA Peer Review and the Public Submissions as well as ARPANSA's own review. 5) The interface between ANSTO, INVAP and ARPANSA in relation to the ongoing compliance with ARPANS Regulation 51 and 54. 6) The future Operating Licence Application, including the draft FSAR and associated documentation. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and how the licensing and regulatory regime within Australia influenced the design of the RRR. In particular, the safety design features that have been incorporated as a result of the specific requirements of ANSTO and the Australian regulator will be briefly described. The paper will close with a description of how the RRR meets, and in many aspects exceeds the requirements of ANSTO and the Australian regulator. (author)

  18. [Vasoplegic Syndrome after Aortic Valve Replacement].

    Science.gov (United States)

    Miyata, Kazuto; Shigematsu, Sayaka

    2016-01-01

    We report a case of vasoplegic syndrome (VS) after aortic valve replacement in a 65 year old male with aortic stenosis. The patient developed hypotension after separation from cardiopulmonary bypass (CPB). Transesophageal echocardiography revealed well-maintained cardiac function and normal prosthetic valve function. However, his cardiac index was 3.0 l x min(-1) x m(-2) and systemic vascular resistance index (SVRI) was 1100 dynes x sec(-1) x cm(-5) x m(-2). Diagnosing VS, norepinephrine administration was commenced. Since his respiratory status was good, the patient was extubated on the day of surgery. Two days after surgery, catecholamines were discontinued with the stabilization of his circulatory status. However, his respiratory status showed gradual deterioration, and he was re-intubated. Chest X-ray showed bilateral pleural effusion, which was treated by drainage and fluid restriction. With this, his oxygenation improved and he could be extubated 5 days after surgery. Vasoplegic syndrome is a potentially life-threatening complication following cardiac surgery. Hypotension at the time of separation from CPB can be due to multiple factors. Despite an incidence rate of 10%, little is known about VS. We hope that, in future, tailored therapeutic protocols for VS will be developed. PMID:27004393

  19. NCDs: can healthy synergies replace fatal interactions?

    Science.gov (United States)

    2013-07-01

    A growing global movement argues for health to take center stage in the post-2015 sustainable human development agenda, building on the Millennium Development Goals and improving measurement of outcomes and equity. Considered key is the urgent need to effectively stem chronic noncommunicable diseases (NCDs). The reasoning is straightforward and yet addresses the interactive complexities of NCD impact and the potential synergies to reduce it: NCDs constitute the most important, if until recently neglected, pandemic of our era. They accounted for over 65% of global deaths and 54% of the global disease burden in 2010.[1,2] Such a negative "contribution" -including the sequelae of disability and alarming costs of treatment for multimorbidities associated with aging populations worldwide-jeopardizes sustainable human development. PMID:23934419

  20. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Unit 2 that will extend the in-service tile of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from he bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  1. Renewable Substitutability Index: Maximizing Renewable Resource Use in Buildings

    Directory of Open Access Journals (Sweden)

    Ravi S. Srinivasan

    2015-05-01

    Full Text Available In order to achieve a material and energy balance in buildings that is sustainable in the long run, there is an urgent need to assess the renewable and non-renewable resources used in the manufacturing process and to progressively replace non-renewable resources with renewables. Such progressive disinvestment in the non-renewable resources that may be substituted with renewable resources is referred to as “Renewable Substitutability” and if implemented, this process will lead to a paradigm shift in the way building materials are manufactured. This paper discusses the development of a Renewable Substitutability Index (RSI that is designed to maximize the use of renewable resources in a building and quantifies the substitution process using solar emergy (i.e., the solar equivalent joules required for any item. The RSI of a building or a building component, i.e., floor or wall systems, etc., is the ratio of the renewable resources used during construction, including replacement and maintenance, to the building’s maximum renewable emergy potential. RSI values range between 0 and 1.0. A higher RSI achieves a low-energy building strategy promoting a higher order of sustainability by optimizing the use of renewables over a building’s lifetime from formation-extraction-manufacturing to maintenance, operation, demolition, and recycle.

  2. [Epidemiology of "sick buildings"].

    Science.gov (United States)

    Sterling, T D; Collett, C; Rumel, D

    1991-02-01

    The indoor environment of modern buildings, especially those designed for commercial and administrative purposes, constitutes a unique ecological niche with its own biochemical environment, fauna and flora. Sophisticated construction methods and the new materials and machinery required to maintain the indoor environment of these enclosed structures produce a large number of chemical by-products and permit the growth of many different microorganisms. Because modern office buildings are sealed, the regulation of humidification and temperature of ducted air presents a dilemma, since difference species of microorganisms flourish at different combinations of humidity and temperature. If the indoor environment of modern office buildings is not properly maintained, the environment may become harmful to its occupants' health. Such buildings are classified as "Sick Buildings". A review of the epidemiology of building illness is presented. The etiology of occupant illnesses, sources of toxic substances, and possible methods of maintaining a safe indoor environment are described. PMID:1784964

  3. Radon in buildings

    International Nuclear Information System (INIS)

    This guide is intended to inform designers, contractors, householders and other building owners about radon in buildings and to provide guidance where it has been decided to take action to reduce radon levels. It gives some pointers to good practice insofar as it relates to non complex buildings of normal design and construction. Reference is made to the usual ways of reducing l;levels of radon and guidance is given on sources of further information. I

  4. Development of Ecological Buildings

    Directory of Open Access Journals (Sweden)

    Andrius Keizikas

    2011-04-01

    Full Text Available The article presents research on ecological buildings and their influence on the constructional sphere. The aim of the paper is to reveal the essence of ecological architecture showing substantial progress and its potential to stimulate architectural and technological growth. The article also describes relations between the ideas of ecological buildings and the ‘passive house’ concepts and aspects of development as well as describes the possibilities of improving building sustainability and energy efficiency. Article in Lithuanian

  5. Radon in buildings

    International Nuclear Information System (INIS)

    This guide is intended to inform designers, householders and other building owners about the radon problem and to help in deciding if there is need to take any action to reduce radon levels in their homes or other buildings.It explains what radon is, how it enters buildings and what effect it may have on health. Reference is made to some of the usual ways of reducing the level of radon and guidance is given on some sources of assistance

  6. A brief on high-volume Class F fly ash as cement replacement – A guide for Civil Engineer

    Directory of Open Access Journals (Sweden)

    Alaa M. Rashad

    2015-12-01

    Full Text Available Disposal of fly ash (FA resulting from the combustion of coal-fired electric power stations is one of the major environmental challenges. This challenge continues to increase with increasing the amount of FA and decreasing the capacity of landfill space. Therefore, studies have been carried out to re-use high-volumes of fly ash (HVFA as cement replacement in building materials. This paper presents an overview of the previous studies carried out on the use of high volume Class F FA as a partial replacement of cement in traditional paste/mortar/concrete mixtures based on Portland cement (PC. Fresh properties, mechanical properties, abrasion resistance, thermal properties, drying shrinkage, porosity, water absorption, sorptivity, chemical resistance, carbonation resistance and electrical resistivity of paste/mortar/concrete mixtures containing HVFA (⩾45% as cement replacement have been reviewed. Furthermore, additives used to improve some properties of HVFA system have been reviewed.

  7. Building valve amplifiers

    CERN Document Server

    Jones, Morgan

    2013-01-01

    Building Valve Amplifiers is a unique hands-on guide for anyone working with tube audio equipment--as an electronics hobbyist, audiophile or audio engineer. This 2nd Edition builds on the success of the first with technology and technique revisions throughout and, significantly, a major new self-build project, worked through step-by-step, which puts into practice the principles and techniques introduced throughout the book. Particular attention has been paid to answering questions commonly asked by newcomers to the world of the valve, whether audio enthusiasts tackling their first build or

  8. Sick building syndrome

    Directory of Open Access Journals (Sweden)

    Tjandra Y. Aditama

    2002-06-01

    Full Text Available Sick building syndrome describes a number of mostly unspesific complaints of some occupants of the building. The exact pathophysiological mechanism remains elusive. It is a multi factorial event which may include physical, chemical, biological as well as psycological factors. In many cases it is due to insufficient maintenance of the HVAC (heating, ventilation, air conditioning system in the building. Sign and symptoms can be uncomfortable and even disabling, which may include mucus membrane irritation, neurotoxic symptoms, asthma like symptoms, skin complaints, gastrointestinal symptoms and other related symptoms. There are various investigation methods to diagnose sick building syndrome, and on site assessment of the building is extremely useful. Prevention through a proactive air quality monitoring program is far more desirable than dealing with an actual sick building. Indoor air and the sick building symdrome serves as a paradigm of modern occupational and environmental medicine. (Med J Indones 2002; 11:124-31Keywords: indoor air pollution, sick building syndrome, building related illness

  9. Nuclear reactor building

    International Nuclear Information System (INIS)

    Purpose: To prevent seismic vibrations of external buildings from transmitting to the side walls of a reactor container in a tank type FBR reactor building. Constitution: The reactor building is structured such that the base mat for a reactor container chamber and a reactor container is separated from the base mat for the walls of building, and gas-tight material such as silicon rubber is filled in the gap therebetween. With such a constitution, even if the crane-supporting wall vibrates violently upon occurrence of earthqualkes, the seismic vibrations do not transmit toward the reactor container chamber. (Horiuchi, T.)

  10. Grassmannians of classical buildings

    CERN Document Server

    Pankov, Mark

    2010-01-01

    Buildings are combinatorial constructions successfully exploited to study groups of various types. The vertex set of a building can be naturally decomposed into subsets called Grassmannians. The book contains both classical and more recent results on Grassmannians of buildings of classical types. It gives a modern interpretation of some classical results from the geometry of linear groups. The presented methods are applied to some geometric constructions non-related to buildings - Grassmannians of infinite-dimensional vector spaces and the sets of conjugate linear involutions. The book is self

  11. Healthy Buildings '88

    International Nuclear Information System (INIS)

    The Healthy Buildings '88 Conference focuses on the technical solutions and functional requirements contributing to Healthy Buildings for people to live and work in. The main object of the Conference is to give architects, consultants, real-estate owners and manufacturers of building materials recommendations on choice of materials and choice of systems and on how to combine materials and systems. The program includes overview lectures, plenary symposia with invited speakers, workshops, poster presentations and an exhibition of scientific, educational and technical material. One part of the conference is devoted to the problem of radon in residential buildings

  12. Replacement of the Advanced Test Reactor control room

    International Nuclear Information System (INIS)

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor

  13. The Comparative study of Automated Face replacement Techniques for Video

    Directory of Open Access Journals (Sweden)

    Harmesh Sanghvi

    2014-03-01

    Full Text Available For entertaining purposes, a computerized special effect referred to as “morphing” has enlarged huge attention and face replacement is one of the interesting tasks. Face replacement in video is a useful application in the amusement and special effect industries. Though various techniques for face replacement have been developed for single image and generally applied in animation and morphing, there are few mechanisms to spread out these techniques to handle videos automatically. Face replacement in video automatically is not only a fascinating application, but a challenging problem. For face replacement in video, the frame-by-frame manipulation process using the software is often time consuming and labor-intensive. Hence, the paper compares numerous latest Automatic face replacement techniques in video to understand the various problems to be solved, their shortcomings and benefits over others.

  14. Principles of human joint replacement design and clinical application

    CERN Document Server

    Buechel, Frederick F

    2015-01-01

    This book is written for the users and designers of joint replacements. In its second extended edition it conveys to the reader the knowledge accumulated by the authors during their forty year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter describes the design methodology now required for joint replacement in the USA and EU countries. The remaining chapters provide a history of joint replacement, an evaluation of earlier and current devices and sample case hist...

  15. Principles of Human Joint Replacement Design and Clinical Application

    CERN Document Server

    Buechel, Frederick F

    2012-01-01

    Drs. Buechel, an orthopaedic surgeon, and Pappas, a professor of Mechanical Engineering, are the designers of several successful joint replacement systems. The most well-known of these is the pioneering LCS knee replacement. They have written this book for the users and designers of joint replacements. It is an attempt to convey to the reader the knowledge accumulated by the authors during their thirty five year effort on the development of replacement devices for the lower limb for the purpose of aiding the reader in their design and evaluation of joint replacement devices. The early chapters describe the engineering, scientific and medical principles needed for replacement joint evaluation. One must understand the nature and performance of the materials involved and their characteristics in vivo, i.e. the response of the body to implant materials. It is also essential to understand the response of the implants to applied loading and motion, particularly in the hostile physiological environment. A chapter de...

  16. THE REPLACEMENT-RENEWAL OF INDUSTRIAL EQUIPMENTS. THE MAPI FORMULAS

    Directory of Open Access Journals (Sweden)

    Meo Colombo Carlotta

    2010-07-01

    Full Text Available Since the production has been found to be an economical means for satisfying human wants, this process requires a complex industrial organization together with a large investment in equipments, plants and productive systems. These productive systems are employed to alter the physical environment and create consumer goods. As a result, they are consumed or become obsolete, inadequate, or otherwise candidates for replacement. When replacement is being considered, two assets must be evaluated: the present asset, the defender and its potential replacement, the challenger. Since the success of an industrial organization depends upon profit, replacement should generally occur if an economic advantage will result. Whatever the reason leading to the consideration of replacement, the analysis and decisions must be based upon estimates of what will occur in the future. In this paper we present the Mapi algorithm as a procedure for evaluating investments or for analyzing replacement opportunities.

  17. Lost in Transit: Product Replacement Bias and Pricing to Market

    OpenAIRE

    Emi Nakamura; Jón Steinsson

    2012-01-01

    The microdata underlying U.S. import and export price indexes exhibit frequent product turnover and highly rigid prices. As a consequence, 40% of products are replaced before a single price change is observed and 70% are replaced after two price changes or less. An aggregate price index that focuses on price changes for identical items over time may, therefore, miss an important component of price adjustment occurring at the time of product replacements. We provide a model of this "product re...

  18. Monticello recirculation piping replacement problems, contingencies, and evolving work scope

    International Nuclear Information System (INIS)

    A description is given of the many significant items that were added to the initial workscope during the detailed preparation and actual replacement of the Monticello reactor recirculation piping. These included chemical decontamination, weld stress improvement, manifold reconfiguration, electro-polishing, extra machining and welding of nozzles, piping scope additions and the replacement of jet pump nozzles. Lessons are drawn for future replacement work. (author)

  19. Can Technology Completely Replace Human Interaction in Class?

    Directory of Open Access Journals (Sweden)

    Fernando Alonso Gómez Carrillo

    2015-04-01

    Full Text Available Nowadays there are so many different and surprising possibilities of applications for ICT ́s in the educational field, that there is a belief that one day ICT will be able to replace the teacher, and in general terms, the man, in any field or human activity. Is it possible that technology will replace the teacher in the pedagogical work? Can technology replace the man himself?

  20. [Partial replacement of obsolete prosthetic implants].

    Science.gov (United States)

    Petit, R

    2005-10-01

    Thanks to better technique for cemented prostheses or to better osteointegration of porous coated implants, a long term survival can be expected for joint prostheses. Wear of the bearing surfaces resulting in osteolysis, metallosis and even rupture has become the main threat after several years. In such cases, revising all the parts of a stable and well fixed implant may cause fractures, loss of bone and thus need an extensive reconstruction. Revising only the worn out parts might be preferable, provided that they still are available. Data collected by the SFHG (French Hip and Knee Society) and AVIO group show that 45% of hip revisions and 16% of knee revisions are partial ones. The need for a total exchange instead of a partial one appeared in 6.4% of knee revisions and 2.8% of hip revisions, because parts were no longer available. These problems linked to a longer life expertancy of the patients and the increasing number of hip and knee arthroplasties will be met more and more often by orthopedic surgeons. When parts identical to the worn out ones are still on the market, there is no problem. When their production has been given up, but the company has kept their references and accepts to make a single element it may be possible to obtain the missing unit. The increased cost of such a fabrication, however is not nowadays supported by an appropriate price. But in a few remaining cases without enough industrial references, a custom-made part had to be done to allow partial replacement, with the benefit of an adapted price. Care must be taken to observe the regulations. The surgeon endorses full responsibility not only for the surgical procedure but also for the choice of the implanted device. For custom-made products he is responsible for the technical data given to the company. The patient must be thoroughly informed, and his opinion taken into account in the operative decision. As a revision arthroplasty aims at restoring a good function, the procedure should

  1. Replacing fallow by cover crops: economic sustainability

    Science.gov (United States)

    Gabriel, José Luis; Garrido, Alberto; Quemada, Miguel

    2013-04-01

    Replacing fallow by cover crops in intensive fertilized systems has been demonstrated as an efficient tool for reducing nitrate leaching. However, despite the evident environmental services provided and the range of agronomic benefits documented in the literature, farmers' adoption of this new technology is still limited because they are either unwilling or unable, although adoption reluctance is frequently rooted in low economic profitability, low water se efficiency or poor knowledge. Economic analyses permit a comparison between the profit that farmers obtain from agricultural products and the cost of adopting specific agricultural techniques. The goal of this study was to evaluate the economic impact of replacing the usual winter fallow with cover crops (barley (Hordeum vulgare L., cv. Vanessa), vetch (Vicia villosa L., cv. Vereda) and rapeseed (Brassica napus L., cv. Licapo)) in irrigated maize systems and variable Mediterranean weather conditions using stochastic Monte-Carlo simulations of key farms' financial performance indicators. The three scenarios studied for each cover crop were: i) just leaving the cover crop residue in the ground, ii) leaving the cover crop residue but reduce following maize fertilization according to the N available from the previous cover crop and iii) selling the cover crop residue for animal feeding. All the scenarios were compared with respect to a typical maize-fallow rotation. With observed data from six different years and in various field trials, looking for different weather conditions, probability distribution functions of maize yield, cover crop biomass production and N fertilizer saving was fitted. Based in statistical sources maize grain price, different forage prices and the cost of fertilizer were fitted to probability distribution functions too. As result, introducing a cover crop involved extra costs with respect to fallow as the initial investment, because new seed, herbicide or extra field operations. Additional

  2. Importance of building maintenance at the time of architectural design of buildings rehabilitated with heritage value

    Institute of Scientific and Technical Information of China (English)

    Rui Calejo Rodrigues; Patrícia Fernandes Rocha

    2011-01-01

    During architectural conception phase,building maintenance problematic is mostly a result of the unintentional use of preconceived architectonical solutions rather than a consequence of a specific influence of maintenance requirements.Hardly the architect in the act of design understands the importance of these solutions in the service life span of a building.Being aware of this,is it possible for the architect to be supplied with a decision support system that allows him to consider the implications of building maintenance since the early design phases? Having awareness of this problem and its consequences in the early design phases a research project was started at the Faculty Engineering of the University of Oporto(FEUP),under which the implications of building maintenance in the act of architectural design is studied.This article presents the methodology developed to identify the needs of maintenance of buildings based on a DSS-decision support system that provides simple tools the architect can use in design phase.This methodology is based on decomposition of building parts-Elements Source of Maintenance ESM-,and subsequently,a set of functional requirements that determine the performance regarding building maintenance on account of architectural decisions.Relevant maintenance actions are defined:Inspection,Pro-action,Cleaning,Correction,Replacement,Legal enforcement,Limits of use.One can thus set up a relationship between the act of design and its performance framework based on behavior,intervention and the ownership of the work of architecture.Using a Multicriteria Analysis (MCA) a qualitative evaluation of different options based on maintenance requirements accomplishment.Conclusions on the importance of architectural conception concerning the building maintenance were clearly arrived at and the utility of the developed decision support tool was also highlighted.

  3. Can postmortem fetal MR imaging replace autopsy?

    International Nuclear Information System (INIS)

    The purposes of this study were to compare postmortem fetal MRI findings with autopsy findings and to assess whether postmortem MRI can replace autopsy. The study group consisted of 13 stillborn fetuses, seven that died immediately after birth, and five terminated because of anomalies seen on prenatal sonograms. A total 17 were male, and eight were female, and their gestational ages were from 20 to 41 (average;28.2) weeks. Spin-echo T1-and T2-weighted axial, sagittal, and coronal MR images were obtained, and autopsy findings were divided into major and minor. A major finding was defined as an anomaly or syndrome which caused fetal death or termination of the pregnancy: minor findings were classified, on the basis of gross inspection, as internal or external. MR images were retrospectively analyzed by two radiologists unaware of the autopsy findings, and by comparison with these, the postmortem MRI detection rates for major and minor findings was then determined. In seven of 25 fetuses, MR imaging revealed major findings, a dietction rate of 100%. There were two cases of anencephaly, two of trisomy-18, and one each of hydrops fetalis with large cystic hygroma, diaphragmatic hernia, and Dandy-Walker malformation. Twenty-three of 60 minor findings (38.3%) were detected by MRI. The detection rates for external and internal findings were 29.6%(8/27) and 45.5%(15/33), respectively. Although a limitation of our study is the low detection rate for minor findings, postmortem fetal MRI may help diagnose the major cause of fetal death

  4. Can postmortem fetal MR imaging replace autopsy?

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jeong Yeon; Song, Mi Jin [Sungkyunkwan Univ. School of Medicine, Seoul (Korea, Republic of); Kim, Seoung Hyup [Seoul National Univ. College of Medicine, Seoul (Korea, Republic of)

    2001-02-01

    The purposes of this study were to compare postmortem fetal MRI findings with autopsy findings and to assess whether postmortem MRI can replace autopsy. The study group consisted of 13 stillborn fetuses, seven that died immediately after birth, and five terminated because of anomalies seen on prenatal sonograms. A total 17 were male, and eight were female, and their gestational ages were from 20 to 41 (average;28.2) weeks. Spin-echo T1-and T2-weighted axial, sagittal, and coronal MR images were obtained, and autopsy findings were divided into major and minor. A major finding was defined as an anomaly or syndrome which caused fetal death or termination of the pregnancy: minor findings were classified, on the basis of gross inspection, as internal or external. MR images were retrospectively analyzed by two radiologists unaware of the autopsy findings, and by comparison with these, the postmortem MRI detection rates for major and minor findings was then determined. In seven of 25 fetuses, MR imaging revealed major findings, a dietction rate of 100%. There were two cases of anencephaly, two of trisomy-18, and one each of hydrops fetalis with large cystic hygroma, diaphragmatic hernia, and Dandy-Walker malformation. Twenty-three of 60 minor findings (38.3%) were detected by MRI. The detection rates for external and internal findings were 29.6%(8/27) and 45.5%(15/33), respectively. Although a limitation of our study is the low detection rate for minor findings, postmortem fetal MRI may help diagnose the major cause of fetal death.

  5. Hormone Replacement Therapy After Breast Cancer

    Directory of Open Access Journals (Sweden)

    Mueck AO

    2008-01-01

    Full Text Available So far, patient samples in all studies investigating hormone replacement therapy (HRT after breast cancer have been small.Therefore, HRT should only be used if alternatives such as specifically not contraindicated phytopreparations or selective sero-tonin reuptake inhibitors (SSRIs are not effective. This is primarily due to forensic reasons since clinical data on the risk ofalternatives (based on present evidence are even more sparse. Regarding HRT, four prospective randomized studies and at least15 observational studies after breast cancer are available. Only the HABITS study shows an increased risk of relapse. The authorssuggest that this is probably associated with the relatively high number of patients with HRT treatment after ER-positive cancersas well as due to the preferred use of estrogen/progestin-combined preparations. Based on the results of the randomized pla-cebo-controlled study Women’s Health Initiative (WHI as well as of at least 12 observational studies, the progestin componentseems to be mainly responsible for the probability of increased diagnosis frequency of primary breast cancer. However, no dataare available on the impact of progestin on the use of combined HRT after breast cancer. However, also with estrogen only anincreased risk of relapse must be expected and patients should be informed about it. This has to be concluded due to biologicalplausibility and observational studies although the estrogen-only arm in WHI did not show any increased primary risk. Thus, anyform of HRT should only be performed in exceptional cases, and treatment duration should be as short as possible with thelowest effective dose.

  6. Performance Evaluation of DSC Windows for Buildings

    Directory of Open Access Journals (Sweden)

    Jun-Gu Kang

    2013-01-01

    Full Text Available Interest in BIPV systems with dye-sensitized solar cells (DSCs that can replace building windows has increased for zero energy buildings. Although DSCs have lower efficiency in terms of electricity generation than silicon solar cells, they allow light transmission and application of various colors; they also have low production costs, which make them especially suitable for BIPV systems. DSC research is interdisciplinary, involving electrical, chemical, material, and metal engineering. A considerable amount of research has been conducted on increasing the electrical efficiency of DSC and their modules. However, there has not been sufficient research on building applications of DSC systems. The aim of this study is to evaluate the optical performance and thermal performance of DSC windows in buildings. For this study, DSC experimental models with different thicknesses and dye colors were manufactured, and their optical properties, such as transmittance and reflectivity, were measured by a spectrometer. The thermal and optical characteristics of double-glazed windows with DSC were analyzed with a window performance analysis program, WINDOW 6.0.

  7. Volume of Requests for Internet Medicare Replacement Cards

    Data.gov (United States)

    Social Security Administration — This dataset provides monthly volumes at the national level from federal fiscal year 2008 onwards for Internet Medicare Replacement Card. The dataset includes only...

  8. The Economic Evaluation for Kori-1 Steam Generator Replacement

    International Nuclear Information System (INIS)

    The economic evaluation was performed for Kori-1 steam generator(SG) replacement, in which the six senarios were evaluated for a 30, 40 and 50 year plant operating period : Scenario 1-Current Maintenance Approach : Scenario 2-SG Replacement as Early as Possible(1998) : Scenario 3-Scenario 2 + 4.8% Rerate :Scenario 4-18% Plugging Limit : Scenario 5-SG Replacement when Plugging Rate exceeds 15% : Scenario 6-Scenario 5 + 4.8% Rerate. The results of the evaluation indicate that immediate replacement of existing SGs was the most profitable alternative, especially in combination with a 4.8% rerate

  9. School Building Defect Pattern

    Directory of Open Access Journals (Sweden)

    Mahli M.

    2014-01-01

    Full Text Available In providing a conducive learning environment for the student, the school building must be in good condition. This paper is evaluating the existing condition of primary school building in Sarawak, Malaysia. It focuses on building defects pattern for school building. The primary data collection is from the school building condition survey with involvement of 24 primary schools. The schools have been selected using simple random sampling and stratified sampling (of school age as the variable of selection. The reporting method is based on Condition Survey Protocol (CSP 1 Matrix. Data analysis covers descriptive and inferential statistics. The analysis carried out found that the overall 4,725 defects have been identified. The building defect pattern is mainly on Ground Level of 3,176 defects, the highest number of defects components found on walls (798. 16.2% defects are cracks from 11 common defects and most of all the highest score of defects based on age of the building were the building in the range of 11 to 20 years.

  10. Integrated Building Design

    DEFF Research Database (Denmark)

    Heiselberg, Per

    In the first half of the 20th century, HVAC systems and artificial lighting were developed to meet indoor comfort needs. Before the introduction of mechanical systems, climate - not building style or appearance - was the major determinant of building form. Comfort was achieved through passive mea...

  11. Building with shapes

    CERN Document Server

    Mooney, Carla

    2014-01-01

    There are shapes everywhere you look. You can put shapes together or build with them. What can you build with three circles? In this title, students will explore and understand that certain attributes define what a shape is called. This title will allow students to identify the main purpose of a text, including what the author wants to answer, explain, or describe.

  12. Dancing building prevents collapse

    NARCIS (Netherlands)

    Visscher, R.

    2007-01-01

    In future, anybody caught inside a building during an earthquake need no longer fear the roof collapsing on them. Thanks to the use of composite materials, all the building will do is dance along, riding the waves of the earthquake. At least, according to Professor Ir. Adriaan Beukers of the Aerospa

  13. Heat loss from Buildings

    DEFF Research Database (Denmark)

    Karlsson, Kenneth; Næraa, Rikke

    1997-01-01

    Determination of heat loss coefficients for buildings in Denmark. The coefficient are determined for 15 building groups and 3 year intervals. They are based on the BBR-registre and assumptions of U-values(W/K*m2)and computed in a simple spreed sheet model.The results are used in the REVEILLE...

  14. Building a Better Robot

    Science.gov (United States)

    Navah, Jan

    2012-01-01

    Kids love to build robots, letting their imaginations run wild with thoughts of what they might look like and what they could be programmed to do. Yet when students use cereal boxes and found objects to make robots, often the projects look too similar and tend to fall apart. This alternative allows students to "build" robots in a different way,…

  15. Building a Data Warehouse.

    Science.gov (United States)

    Levine, Elliott

    2002-01-01

    Describes how to build a data warehouse, using the Schools Interoperability Framework (www.sifinfo.org), that supports data-driven decision making and complies with the Freedom of Information Act. Provides several suggestions for building and maintaining a data warehouse. (PKP)

  16. Building Numbers from Primes

    Science.gov (United States)

    Burkhart, Jerry

    2009-01-01

    Prime numbers are often described as the "building blocks" of natural numbers. This article shows how the author and his students took this idea literally by using prime factorizations to build numbers with blocks. In this activity, students explore many concepts of number theory, including the relationship between greatest common factors and…

  17. Body-building

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    正In recent years, more and more people spare no pains to join in the body-building group. People begin to take part in various fitness clubs or fitness centers in their spare time. This shows body-building has become an indispensable part of many people’s life.

  18. Electromagnetically shielded building

    International Nuclear Information System (INIS)

    This invention relates to a building having an electromagnetic shield structure well-suited for application to an information network system utilizing electromagnetic waves, and more particularly to an electromagnetically shielded building for enhancing the electromagnetic shielding performance of an external wall. 6 figs

  19. Filtrations and Buildings

    OpenAIRE

    Cornut, Christophe

    2014-01-01

    We construct and study a scheme theoretical version of the Tits vectorial building, relate it to filtrations on fiber functors, and use them to clarify various constructions pertaining to Bruhat-Tits buildings, for which we also provide a Tannakian description.

  20. Technical Management for Buildings

    CERN Document Server

    Vairo, Antonio

    1999-01-01

    This paper is a presentation of an 'instrument' for the optimization of the functionality and conservation of tertiary buildings. This technique has several different names: Building Automation Systems (BAS), Central Control and Monitoring System (CCMS) in English, and Gestion Technique du Bâtiment' (GTB) or Gestion Technique Centralisée (GTC) in French. With this technique it is possible to manage all the functions of a building, it is a modern instrument that introduces the concept of 'automation' in the operation of buildings using computerized procedures, earlier reserved for industrial processes. The system is structured with different automation levels with a distributed intelligence, each level characterized by a communication system (Fieldbus for the lowest and Ethernet for the highest level). In order to apply the BAS to CERN buildings it is necessary to evaluate the advantages, the CERN requirements and the integration with the several existing control and automation systems.

  1. CERN's newest building

    CERN Multimedia

    Anaïs Vernède

    2011-01-01

    With a growing number of users looking for offices, the shortage of space has become acute, particularly for physicists. Building 42, inaugurated on Friday 11 February, offers almost 300 new work-spaces and a particularly pleasant working environment.   Mauro Dell’Ambrogio, the Swiss State Secretary for Education and Research (left), Rolf Heuer , CERN Director-General (centre), and Mark Muller, President of the Government of the Republic and Canton of Geneva and Head of the Department of Construction and Information Technology (right) at the opening of Building 42 on 11 February, 2011.   Construction work for the new Building 42 began in January 2009, thanks to support from the Swiss foundation FIPOI (Fondation des immeubles pour les organisations internationales). After two years of work, the building, an extension of Building 40, is ready to accommodate physicists from around the world who have come to work on the LHC. "We had more than 25 external contractors working...

  2. Durability and acoustics of concrete with slag of cupola furnace as fine aggregate replacement

    Directory of Open Access Journals (Sweden)

    Ricardo Alfredo Cruz Hernández

    2015-01-01

    Full Text Available In this paper, it was evaluated the performance of concrete with crushed slag of cupola furnace (SCF as sand replacement in percentages of 0 %, 10 %, 15 % and 20 %, subjected to accelerated chemical attacks of carbonation, sulfation and alkali-aggregate reaction (AAR. The sound absorption characteristics of the material were determined through the sound absorption coefficient (α, and the noise reduction coefficient (NRC. Carbonation was evaluated through a closed camera with the 70 % concentration of carbon dioxide and conditions of relative humidity between 50 % and 70 %. The results indicated that the penetration depth of CO2 is lower when greater the percentage of substitution is. To accelerate the attack by sulfates, specimens were immersed in aqueous solution of sodium sulfate anhydrous (Na2SO4 1N with cycles of wetting and drying. It determined that the impairment presented in concrete paste is directly proportional to the percentage of sand replacement. The acceleration of the AAR in the concrete was carried out by immersing specimens in an aqueous solution of sodium hydroxide (NaOH for 16 days. The test concluded that the inclusion of SCF is not favorable for AAR. The measurement of sound absorption coefficient was taken by the method of impedance tube, relating minimum and maximum values of stationary wave amplitude. The results showed that SCF with higher sand replacement are favorable for the noise absorption in buildings.

  3. Technology Solutions Case Study: Replacement of Variable-Speed Motors for Furnaces

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-02-01

    In conjunction with the New York State Energy Research and Development Authority (NYSERDA) and Proctor Engineering Group, Ltd. (PEG), the Consortium for Advanced Residential Buildings (CARB) evaluated the Concept 3™ replacement motors for residential furnaces in eight homes in Syracuse, NY. These brushless, permanent magnet (BPM) motors can use much less electricity than their PSC (permanent split capacitor) predecessors. This evaluation focuses on existing homes in the heating-dominated climate of upstate New York with the goals of characterizing field performance and cost-effectiveness. The results of this study are intended to be useful to home performance contractors, HVAC contractors, and home efficiency program stakeholders. Tests and monitoring was performed both before and after fan motors were replaced. Average fan power reductions were approximately 126 Watts during heating and 220 Watts during cooling operation. Over the course of entire heating and cooling seasons, these translated into average electric energy savings of 163 kWh, with average cost savings of $20 per year. Homes where the fan was used outside of heating and cooling mode saved an additional $42 per year on average. Results indicate that BPM replacement motors will be most cost-effective in HVAC systems with longer run times and relatively low duct static pressures. More dramatic savings are possible if occupants use the fan-only setting when there is no thermal load.

  4. Effect of growth hormone replacement therapy on pituitary hormone secretion and hormone replacement therapies in GHD adults

    DEFF Research Database (Denmark)

    Hubina, Erika; Mersebach, Henriette; Rasmussen, Ase Krogh;

    2004-01-01

    We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes.......We tested the impact of commencement of GH replacement therapy in GH-deficient (GHD) adults on the circulating levels of other anterior pituitary and peripheral hormones and the need for re-evaluation of other hormone replacement therapies, especially the need for dose changes....

  5. Electric field replaces gravity in laboratory

    Science.gov (United States)

    Gorgolewski, S.

    For several years experiments in physical laboratories and in the fitotron have shown that one can replace gravitational field with electrical fields for plants. First obvious experiments in strong electrical fields in the MV/m regi on show that any materials and living plants respond immediately to Coulomb forces. Such fields are found in nature during thunderstorms. One has to be very careful in handling such strong fields for safety reasons. The fair weather global electrical field is about 20,000 times weaker. The coulomb forces are proportional to the square of the field strength and are thus 400 milion times weaker for a field of the order of 100 V/m.Yet it was found that some plants respond to such "weak" fields. We must remember that the electrical field is a factor of 10 38 times stronger than gravitational interaction. In plants we have dissociated in water mineral salts and the ions are subject to such ernormous forces. It was shown and published that the positive charges in the air in fields of the order of 3kV/m enhance lettuce growth by a factor of four relative to fields about 30 times weaker (100V/m). Reversal of the field polarity reverses the direction of plant growth and retards the plant's growth. Such fields overpower the gravitropism in the laboratory. More so horizontal electrical field is othogonal to gravity, now the fields do not see each other. Lettuce now growth horizontally ignoring the gravitational field. We can thus select the plants whose electrotropism even in the laboratory overwhelms gravity. This is important for the long space flights that we must grow vegetarian food for the crew. The successful harvesting of wheat in orbit does not contradict our experimental findings because wheat is not electrotropic like all plants from the grass family. The results of fitotron experiments with kV/m electrical fields are richly illustrated with colour digital photographs. We also subjected the candle flame to very strong horizontal

  6. A CMMS Expert using BIM for IBS Building Maintenance

    Directory of Open Access Journals (Sweden)

    Hamzah Noraini

    2016-01-01

    Full Text Available In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

  7. LED Lightbulbs as a Source of Electricity Saving in Buildings

    Directory of Open Access Journals (Sweden)

    Zeb Akhtar

    2016-01-01

    Full Text Available Today a number of renewable energy technologies are available for power generation, but fossil fuels are still providing a dominant share nevertheless. In order to decrease the electric bill and save our environment, energy conservation is always crucial. In this paper a very interesting idea is presented which is economically viable to reduce electricity usage in our buildings. An effort has been made to estimate the amount of energy that could be saved in the dormitory section of the IMOP building in Russia. Although there are many ways to reduce the consumption of electricity in this building but here the emphasis is on changing light bulbs inside the rooms, kitchen, toilet and bathroom of each apartment. The scope of the study is to figure out monthly electricity saving by replacing traditional light bulbs by LED light bulbs in the building under consideration. The total investment required and the payback period is also presented.

  8. 25 CFR 700.213 - Methods of providing last resort replacement housing.

    Science.gov (United States)

    2010-04-01

    ... necessary, rehabilitation of a replacement dwelling; (5) The purchase of land and/or a replacement dwelling...) Rehabilitation of, and/or additions to, an existing replacement dwelling; (2) A replacement housing payment...

  9. Aging of elastomers in CANDU pressure boundary service

    International Nuclear Information System (INIS)

    This report describes the properties and aging of elastomers, and examines the performance of major elastomeric components in CANDU pressure boundary service. The components examined are vacuum building roof seals, pressure relief duct seals, airlock door seals, fuelling machine hoses, and cable penetrations. For each of these components, the design requirements, technical specifications and component testing procedures are compared with applicable standards. Information on actual and recommended monitoring and maintenance methods is presented. Operational and environmental stressors are identified. Component failure modes, causes and frequencies are described, as well as the remedial action taken. Many different elastomers are used in CANDU plants, for many different applications. Standards and manufacturers' recommendations are not consistent and may vary from one component to another. Accordingly, the monitoring, maintenance and replacement practices tend to vary from one application to another, and may also be different at different stations. Recommendations are given in this report for improved monitoring and maintenance, in an attempt to provide more consistency in approach. A summary of some experiences with elastomers from non-Canadian sources is contained in the last section. 125 refs

  10. 41 CFR 51-6.13 - Replacement and similar commodities.

    Science.gov (United States)

    2010-07-01

    ... commodities. 51-6.13 Section 51-6.13 Public Contracts and Property Management Other Provisions Relating to... PROCEDURES § 51-6.13 Replacement and similar commodities. (a) When a commodity on the Procurement List is replaced by another commodity which has not been recently procured, and a nonprofit agency can furnish...

  11. 41 CFR 51-6.14 - Replacement services.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Replacement services. 51... § 51-6.14 Replacement services. If a service is on the Procurement List to meet the needs of a Government entity at a specific location and the entity moves to another location, the service at the...

  12. 49 CFR 24.404 - Replacement housing of last resort.

    Science.gov (United States)

    2010-10-01

    ... method selected for providing last resort housing assistance is cost effective, considering all elements... replacement housing payment under this section may be provided in installments or in a lump sum at the Agency... eligible to receive a replacement housing payment under §§ 24.401 and 24.402 because of failure to meet...

  13. Improving compliance with hormonal replacement therapy in primary osteoporosis prevention

    DEFF Research Database (Denmark)

    Vestergaard, P; Hermann, A P; Gram, J;

    1997-01-01

    To evaluate whether introduction of treatment alternatives would improve compliance with hormonal replacement therapy (HRT) as primary osteoporosis prevention in women not tolerating the first line osteoporosis prevention schedule.......To evaluate whether introduction of treatment alternatives would improve compliance with hormonal replacement therapy (HRT) as primary osteoporosis prevention in women not tolerating the first line osteoporosis prevention schedule....

  14. Efforts for optimization of BWR core internals replacement

    International Nuclear Information System (INIS)

    The core internal components replacement of a BWR was successfully completed at Fukushima-Daiichi Unit 3 (1F3) of the Tokyo Electric Power Company (TEPCO) in 1998. The core shroud and the majority of the internal components made by type 304 stainless steel (SS) were replaced with the ones made of low carbon type 316L SS to improve Intergranular Stress Corrosion Cracking (IGSCC) resistance. Although this core internals replacement project was completed, several factors combined to result in a longer-than-expected period for the outage. It was partly because the removal work of the internal components was delayed. Learning a lesson from whole experience in this project, some methods were adopted for the next replacement project at Fukushima-Daiichi Unit 2 (1F2) to shorten the outage and reduce the total radiation exposure. Those are new removal processes and new welding machine and so on. The core internals replacement work was ended at 1F2 in 1999, and both the period of outage and the total radiation exposure were the same degree as expected previous to starting of this project. This result shows that the methods adopted in this project are basically applicable for the core internals replacement work and the whole works about the BWR core internals replacement were optimized. The outline of the core internals replacement project and applied technologies at 1F3 and 1F2 are discussed in this paper. (author)

  15. 30 CFR 57.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 57.12036 Section 57.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12036 Fuse removal or replacement. Fuses shall not be removed...

  16. Relapsing hypocupraemic myelopathy requiring high‐dose oral copper replacement

    OpenAIRE

    Prodan, C I; Bottomley, S S; Holland, N R; Lind, S. E.

    2006-01-01

    Adult‐onset copper deficiency with neurological manifestations is a newly recognised syndrome. Long‐term oral copper replacement therapy has been the mainstay of treatment in the literature. A case of relapsing hypocupraemic myelopathy responsive to increased doses of copper replacement is reported. Standard doses of copper may not be sufficient for all patients.

  17. 7 CFR 274.6 - Replacement issuances to households.

    Science.gov (United States)

    2010-01-01

    ...) Except for households certified under 7 CFR part 280, replacement issuances shall be provided in the... due to damage in the mail before delivery or by a discrepancy in the issuance unit's inventory; (2... hearing process. (h) Documentation and reconciliation of replacement issuances. (1) The State agency...

  18. Renal replacement therapy after cardiac surgery; renal function recovers

    DEFF Research Database (Denmark)

    Steinthorsdottir, Kristin Julia; Kandler, Kristian; Agerlin Windeløv, Nis;

    2013-01-01

    To assess renal outcome in patients discharged from hospital following cardiac surgery-associated acute kidney injury (CSA-AKI) with need for renal replacement therapy.......To assess renal outcome in patients discharged from hospital following cardiac surgery-associated acute kidney injury (CSA-AKI) with need for renal replacement therapy....

  19. Continuous renal replacement therapy for critically ill infants and children

    DEFF Research Database (Denmark)

    Pedersen, Ole; Jepsen, Søren Bruun; Toft, Palle

    2012-01-01

    Continuous renal replacement therapy (CRRT) is an important treatment in critically ill children with acute kidney injury (AKI). Over the past decade, CRRT has been the preferred method of renal replacement therapy. We compared children with CRRT-treated adults with AKI in terms of return of kidney...

  20. A.R.T. – Aggression Replacement Training

    DEFF Research Database (Denmark)

    Harbo, Lotte Junker; Domben, Eskil

    2015-01-01

    Artiklen indeholder en kort introduktion, eksemplificeret ved case, af det manualbaserede program til behandling af udadreagerende unge Aggression Replacement Training.......Artiklen indeholder en kort introduktion, eksemplificeret ved case, af det manualbaserede program til behandling af udadreagerende unge Aggression Replacement Training....

  1. Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Megan Donahue

    2009-02-24

    A replacement conveyorized photoresist stripping system was characterized to replace the ASI photoresist stripping system. This system uses the qualified ADF-25c chemistry for the fabrication of flex circuits, while the ASI uses the qualified potassium hydroxide chemistry. The stripping process removes photoresist, which is used to protect the copper traces being formed during the etch process.

  2. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the...

  3. Functionality of Inulin as a Sucrose Replacer in Cookie Baking

    Science.gov (United States)

    Inulin was evaluated as a sucrose replacer for healthy cookie production with benefits of low glycemic impact and prebiotic soluble fiber. Sucrose (as a reference) and three inulin products of different concentrations (as soluble fibers) were used to explore the effects of sugar-replacer type on so...

  4. Energy management systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lush, D.M.

    1979-07-01

    An investigation is made of the range of possibilities available from three types of systems (automatic control devices, building envelope, and the occupants) in buildings. The following subjects are discussed: general (buildings, design and personnel); new buildings (envelope, designers, energy and load calculations, plant design, general design parameters); existing buildings (conservation measures, general energy management, air conditioned buildings, industrial buildings); man and motivation (general, energy management and documentation, maintenance, motivation); automatic energy management systems (thermostatic controls, optimized plant start up, air conditioned and industrial buildings, building automatic systems). (MCW)

  5. Knowledge formalization of intelligent building

    Science.gov (United States)

    Žáček, Martin

    2016-06-01

    This article aim is understanding the basic knowledge about an intelligent building. The notion of the intelligent building can be called any building equipped with computer and communication technology, which can automatically respond to internal or external stimuli. The result of the intelligent building is an automated and foreseeing of activities that enable to reduce operating costs and increase comfort. The best way to use the intelligent building is for a low-energy building, a passive building, or for building with high savings. The output of this article is the formalization of basic knowledge of the intelligent building by RDF graph.

  6. REPLACEMENT CONTROL OF INNOVATION MANAGERS: ORGANIZATIONAL AND ECONOMIC ASPECTS

    Directory of Open Access Journals (Sweden)

    E. V. Gurina

    2011-01-01

    Full Text Available The paper substantiates phases of specialists’ replacement ensuring innovation development of the national economy in Belarus, i.e. managers of innovation activity. Realization of replacement phases is presented within the system consisting of four blocks – objective, managing, controllable and providing. Analysis results of the current state of the innovation activity managers replacement system reveal main problems in interaction of its basic agents. The paper considers solution of specified problems in the context of formation of organizational and economic approaches to managing the innovation activity managers replacement system which presupposes modernization of organizational interrelations between state- run public authorities in the managing block and micro-incentive structures in the controllable block as well as the usage of the process approach in every phase of the replacement process. 

  7. Advanced heavy water reactor pressure tube-easy replaceability

    International Nuclear Information System (INIS)

    Advanced Heavy Water Reactor (AHWR) is a 300 MWe vertical pressure tube type reactor. A coolant channel consists of pressure tube, made of Zr-2.5 % Nb, which is separated from cold calandria tube using garter spring spacers. The principal function of pressure tube is to support and locate the fuel assembly and allows light water coolant through fuel assembly by natural circulation. Since AHWR is designed for life of 100 years, it necessitates the replacement of pressure tubes during service life. Easy replaceability of pressure tube, along with surveillance requirements, has major bearing on the design of coolant channel assembly. The several systems and tools have been conceptualised to cater the needs for easy and quick replacement of a pressure tube during reactor shut down. This paper gives the highlights of the innovative design features of coolant channel, preliminary design and pre-requisites for replacement, and experimental programme for demonstration of easy replaceability. (author)

  8. Radiation exposure management for the Point Beach steam generator replacement

    International Nuclear Information System (INIS)

    Replacement of the steam generators at the Point Beach Unit 1 Nuclear Plant was a turnkey project undertaken for Wisconsin Electric Power Company (WEPCO) by Westinghouse. Westinghouse had full responsibility for the program from project management and all steam generator removal/installation activities to health physics implementation. The replacement method associated with the replacement was a pipe cut approach as opposed to the channel head cut method. The replacement work began in early October 1983 and was completed on January 25, 1984 - 31 days ahead of schedule and with a record-low collective radiation exposure of 590 man-rem. The success of the operation, from a radiation exposure management point of view, is attributed primarily to extensive planning and implementation of innovative replacement techniques

  9. Inspection-replacement policy of system under predictive maintenance

    Institute of Scientific and Technical Information of China (English)

    LIU Bao-you; FANG You-tong; WEI Jin-xiang; WANG Yong-liang

    2007-01-01

    In general, every system is in one of the three states: normal, abnormal, or failure state. When the system is diagnosed as abnormal state, it needs predictive maintenance. If the system fails, an identical new one will replace it. The predictive maintenance cannot make the system "as good as new". Under these assumptions, the reliability index and the inspection-replacement policy of a system were studied. The explicit expression of the reliability index and the average income rate (i.e., the long-runaverage income per unit time) are derived by using probability analysis and vector Markov process method. The criterion of feasibility for the optimal inspection-replacement policy under the maximum average income rate is obtained. The numerical example shows the optimal inspection-replacement policy can raise the average income rate when the optimal inspection-replacement policy is feasible.

  10. Building Sustainability Assessment

    Directory of Open Access Journals (Sweden)

    Heli Koukkari

    2010-07-01

    Full Text Available Although social, economic, and cultural indicators are of substantial importance to the concept of sustainable building, this concept is usually related to environmental characteristics. Any building level assessment method is complex and involves contradictory aspects. Moreover, emphasizing qualitative criteria only increases confusion. R&D and standardization are thus concentrated to transparency and usability of the environmental methods. Other directions of research aim at performance-based design and methods to take regional and cultural aspects into account. In this paper, the perspectives of the sustainability assessment of a whole building are presented, based on a state of the art, feasibility study on performance analysis and the development of an extended life-cycle assessment for buildings. Using various tools, and based on the case studies of building sustainability assessment, environmental indicators were often shown to be of lesser importance than the other, soft ones. The first steps in the development of a building sustainability assessment method for Portuguese residential buildings will be presented and discussed in the end.

  11. Building Software with Gradle

    CERN Document Server

    CERN. Geneva; Studer, Etienne

    2014-01-01

    In this presentation, we will give an overview of the key concepts and main features of Gradle, the innovative build system that has become the de-facto standard in the enterprise. We will cover task declaration and task graph execution, incremental builds, multi-project builds, dependency management, applying plugins, extracting reusable build logic, bootstrapping a build, and using the Gradle daemon. By the end of this talk, you will have a good understanding of what makes Gradle so powerful yet easy to use. You will also understand why companies like Pivotal, LinkedIn, Google, and other giants with complex builds count on Gradle. About the speakers Etienne is leading the Tooling Team at Gradleware. He has been working as a developer, architect, project manager, and CTO over the past 15 years. He has spent most of his time building software products from the ground up and successfully shipping them to happy customers. He had ...

  12. Building-integrated photovoltaics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    This is a study of the issues and opportunities for building-integrated PV products, seen primarily from the perspective of the design community. Although some quantitative analysis is included, and limited interviews are used, the essence of the study is qualitative and subjective. It is intended as an aid to policy makers and members of the technical community in planning and setting priorities for further study and product development. It is important to remember that the success of a product in the building market is not only dependent upon its economic value; the diverse group of building owners, managers, regulators, designers, tenants and users must also find it practical, aesthetically appealing and safe. The report is divided into 11 sections. A discussion of technical and planning considerations is followed by illustrative diagrams of different wall and roof assemblies representing a range of possible PV-integration schemes. Following the diagrams, several of these assemblies are then applied to a conceptual test building which is analyzed for PV performance. Finally, a discussion of mechanical/electrical building products incorporating PVs is followed by a brief surveys of cost issues, market potential and code implications. The scope of this report is such that most of the discussion does not go beyond stating the questions. A more detailed analysis will be necessary to establish the true costs and benefits PVs may provide to buildings, taking into account PV power revenue, construction costs, and hidden costs and benefits to building utility and marketability.

  13. Buildings Interoperability Landscape

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Dave [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stephan, Eric G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Corbin, Charles D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Widergren, Steven E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-12-31

    Through its Building Technologies Office (BTO), the United States Department of Energy’s Office of Energy Efficiency and Renewable Energy (DOE-EERE) is sponsoring an effort to advance interoperability for the integration of intelligent buildings equipment and automation systems, understanding the importance of integration frameworks and product ecosystems to this cause. This is important to BTO’s mission to enhance energy efficiency and save energy for economic and environmental purposes. For connected buildings ecosystems of products and services from various manufacturers to flourish, the ICT aspects of the equipment need to integrate and operate simply and reliably. Within the concepts of interoperability lie the specification, development, and certification of equipment with standards-based interfaces that connect and work. Beyond this, a healthy community of stakeholders that contribute to and use interoperability work products must be developed. On May 1, 2014, the DOE convened a technical meeting to take stock of the current state of interoperability of connected equipment and systems in buildings. Several insights from that meeting helped facilitate a draft description of the landscape of interoperability for connected buildings, which focuses mainly on small and medium commercial buildings. This document revises the February 2015 landscape document to address reviewer comments, incorporate important insights from the Buildings Interoperability Vision technical meeting, and capture thoughts from that meeting about the topics to be addressed in a buildings interoperability vision. In particular, greater attention is paid to the state of information modeling in buildings and the great potential for near-term benefits in this area from progress and community alignment.

  14. Can Geothermal Power Replace Fossil Fuels?

    Science.gov (United States)

    Klenner, R.; Gosnold, W. D.

    2009-12-01

    is scaled up to produce power in the MW range. Values needed for these systems are temperatures of 92+ °C and flow rates of 140-1000 gpm. In a detailed analysis of the North Dakota part of the Williston Basin, we used heat flow, bottom-hole temperatures, and measured temperature gradients to calculate the energy contained within specific formations having temperatures in the range of 100 °C to 150 °C. We find that at a 2% recovery factor, approximately 4500 MW/hr can be recovered at depths of 3-4 km. North Dakota currently produces approximately 3100 MW/hr from non-renewable sources such as coal and petroleum. We conclude that the geothermal resource in the Williston Basin could completely replace fossil fuels as an electrical power supply for North Dakota.

  15. The corporate brand building

    OpenAIRE

    Wisterová, Veronika

    2011-01-01

    The target of this master's thesis is to follow the process of corporate brand building of the company Starkl zahradník, to analyse it and to suggest possible improvements. The thesis is divided into four main sections. The first section deals with the theoretical aspects of the corporate brand building. The second section observes the process of brand building of the brand Starkl zahradník. The third section deals with the survey that was carried out and analyse its results. This survey was ...

  16. Building Social Web Applications

    CERN Document Server

    Bell, Gavin

    2009-01-01

    Building a web application that attracts and retains regular visitors is tricky enough, but creating a social application that encourages visitors to interact with one another requires careful planning. This book provides practical solutions to the tough questions you'll face when building an effective community site -- one that makes visitors feel like they've found a new home on the Web. If your company is ready to take part in the social web, this book will help you get started. Whether you're creating a new site from scratch or reworking an existing site, Building Social Web Applications

  17. INL Green Building Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Jennifer Dalton

    2005-05-01

    Green buildings, also known as sustainable buildings, resource efficient buildings, and high performance buildings, are structures that minimize the impact on the environment by using less energy and water, reducing solid waste and pollutants, and limiting the depletion of natural resources. As Idaho National Laboratory (INL) becomes the nation’s premier nuclear energy research laboratory, the physical infrastructure will be established to help accomplish the mission. This infrastructure, particularly the buildings, should incorporate green design features in order to be environmentally responsible and reflect an image of progressiveness and innovation to the public and prospective employees. With this in mind, the recommendations described in this strategy are intended to form the INL foundation for green building standards. The recommendations in this strategy are broken down into three levels: Baseline Minimum, Leadership in Energy and Environmental Design (LEED)Certification, and Innovative. Baseline Minimum features should be included in all new occupied buildings no matter what the purpose or size. These features do not require significant research, design, or capital costs and yet they can reduce Operation and Maintenance (O&M) costs and produce more environmentally friendly buildings. LEED Certification features are more aggressive than the Baseline Minimums in that they require documentation, studies, and/or additional funding. Combined with the Baseline Minimums, many of the features in this level will need to be implemented to achieve the goal of LEED certification. LEED Silver certification should be the minimum goal for all new buildings (including office buildings, laboratories, cafeterias, and visitor centers) greater than 25,000 square feet or a total cost of $10 million. Innovative features can also contribute to LEED certification, but are less mainstream than those listed in the previous two levels. These features are identified as areas where

  18. Building for energy conservation

    Energy Technology Data Exchange (ETDEWEB)

    O' Callaghan, P.W.

    1978-01-01

    The need to conserve energy, how energy may be saved, and thermal energy conservation in buildings are discussed in the introductory chapter. Heat gains and losses, fluid flow, convective heat transfer, and radiative heat transfer are covered in chapter 2, fundamentals. Thermal comfort, climate, heat losses from buildings, heat gains to buildings, thermal network analysis, energy thrift, secondary effects, waste heat recovery, and altenative energy sources are subjects covered in chapters 3 to 11. The final chapter, prospectus for the future, covers discussions on areas where energy should be saved, total energy, energy management, energy accounting, and practicing energy conservation. (MCW)

  19. The Development of Elementary School Educational Specifications and Preliminary Building Plans Through the Use of Citizen and Staff Involvement.

    Science.gov (United States)

    Davis, Robert F.

    This dissertation recounts the functioning of a practicum established to develop educational specifications and preliminary building plans for five new elementary schools in the Sacramento City Unified School District. These buildings will be built to replace schools that do not meet earthquake safety standards. Project teams developed educational…

  20. Variable cluster analysis method for building neural network model

    Institute of Scientific and Technical Information of China (English)

    王海东; 刘元东

    2004-01-01

    To address the problems that input variables should be reduced as much as possible and explain output variables fully in building neural network model of complicated system, a variable selection method based on cluster analysis was investigated. Similarity coefficient which describes the mutual relation of variables was defined. The methods of the highest contribution rate, part replacing whole and variable replacement are put forwarded and deduced by information theory. The software of the neural network based on cluster analysis, which can provide many kinds of methods for defining variable similarity coefficient, clustering system variable and evaluating variable cluster, was developed and applied to build neural network forecast model of cement clinker quality. The results show that all the network scale, training time and prediction accuracy are perfect. The practical application demonstrates that the method of selecting variables for neural network is feasible and effective.

  1. Closing the gap in reserves replacement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    A compilation of extended abstracts are provided. Abstract titles listed: The Norwegian continental shelf- future exploration potential; stratigraphic traps - learning and mapping techniques from Ringhorn West - Norwegian North Sea; depth migration of electromagnetic seabed logging data; acquisition independent 3D SRME by wave field modelling; seismic attenuation and hybrid attributes to reduce exploration risk - North Sea case study; the role of rock physics in oil and gas exploration. Linking geological processes, seismic amplitudes and electromagnetic data in the next generation exploration work flows; oil discovery in PL281, deep water Norwegian Sea; towards a second exploration well; seismic mapping of reservoir quality on ultra far offsets; examples from the Njord Field, offshore Norway; long offset simultaneous inversion for seismic reservoir characterization - a case study: the Gryphon Field; case studies in advanced multiple removal; volume model building - a hierarchical segmentation approach; 3D PP/PS pre stack depth migration on the Volve Field; re-developing Europe's largest onshore oil field: how to justify new 3D seismic for the Schoonebeek; reservoir characterization on the Goliat Field: the use of integrated well-driven seismic processing and inversion; efficient RD in geophysics through partnership with academia, service companies and oil companies; 3D high-resolution V{sub p}/V{sub s} inversion of 4C seismic: application in processing, exploration and reservoir characterization; high-resolution reservoir characterization through AVA joint inversion of partially stacked seismic amplitude data and well logs: application to deep water hydrocarbon reservoirs in the Central Gulf of Mexico; depletion induces stresses and strain - a broad perspective; real time update of a reservoir property model in geo steering applications; modelling the seismic response to production: a closer look at the sensitivity to overburden, survey, rock physics model

  2. Study, Development, and Design of Replaceable Shear Yielding Steel Panel Damper

    International Nuclear Information System (INIS)

    For middle-high rise buildings, vibration controlled structures to reduce the damage of main frames are recently becoming general in Japan. A steel material damper is low price and excellent in the energy absorption efficiency at a large earthquake. Though the exchange of the dampers are necessary when an excessive accumulation of plasticity deformation occurs, a steel material damping system, which received an excessive accumulation of plasticity deformation after a large earthquake, can recover a seismic-proof performance and property value of the building after the replacement. In the paper, shear yielding steel panel dampers installed in the web of a beam connected with high tension bolt joint is introduced. This damper is made of low-yield point steel, and the advantages of this system are low cost, easy-production and easy-replacement. For this steel panel damper, the finite element method (FEM) analysis using the shell element model adjusted to 1/2 of 6.4 m beam span is executed to make the design most effective. Yielding property of the beam installing this damper, shape of the splice plate and the bolt orientation for the connecting are examined in this analysis. As a result, we found that the plastic strain extends uniformly to the entire damping panel when making the splice plate a trapezoidal shape. The basic performance confirmation examination was also done using the real scale examination model besides the FEM analysis, and the performance of the system was confirmed. In addition, design of a high rise building in which the steel shear-yielding panel dampers and oil dampers were adopted without disturbing an architectural plan is also introduced

  3. Study, Development, and Design of Replaceable Shear Yielding Steel Panel Damper

    Science.gov (United States)

    Murakami, Katsuhide; Keii, Michio

    2008-07-01

    For middle-high rise buildings, vibration controlled structures to reduce the damage of main frames are recently becoming general in Japan. A steel material damper is low price and excellent in the energy absorption efficiency at a large earthquake. Though the exchange of the dampers are necessary when an excessive accumulation of plasticity deformation occurs, a steel material damping system, which received an excessive accumulation of plasticity deformation after a large earthquake, can recover a seismic-proof performance and property value of the building after the replacement. In the paper, shear yielding steel panel dampers installed in the web of a beam connected with high tension bolt joint is introduced. This damper is made of low-yield point steel, and the advantages of this system are low cost, easy-production and easy-replacement. For this steel panel damper, the finite element method (FEM) analysis using the shell element model adjusted to 1/2 of 6.4 m beam span is executed to make the design most effective. Yielding property of the beam installing this damper, shape of the splice plate and the bolt orientation for the connecting are examined in this analysis. As a result, we found that the plastic strain extends uniformly to the entire damping panel when making the splice plate a trapezoidal shape. The basic performance confirmation examination was also done using the real scale examination model besides the FEM analysis, and the performance of the system was confirmed. In addition, design of a high rise building in which the steel shear-yielding panel dampers and oil dampers were adopted without disturbing an architectural plan is also introduced

  4. Experimental Studies on Partial Replacement of Cement by Using Hypo Sludge Concrete

    Directory of Open Access Journals (Sweden)

    N.Sivakumar*1

    2014-04-01

    Full Text Available Over 300 million tones of industrial wastes are being produced per annum by chemical and agricultural process in India. These materials pose problems of disposal and health hazards. The wastes like phosphogypsum, fluorogypsum and red mud contain obnoxious impurities which adversely affect the strength and other properties of building materials based on them. Out of several wastes being produced at present, the use of phosphogypsum, flurogypsum, lime sludge, hypo sludge, red mud, and mine tailing is of paramount significance to protect the environment. Paper making generally produces a large amount of solid waste. Paper fibers can be recycled only a limited number of times before they become too short or weak to make high quality paper. It means that the broken, low- quality paper fibers are separated out to become waste sludge. All the inks, dyes, coatings, pigments, staples and “stickies” (tape, plastic films, etc. are also washed off the recycled fibers to join the waste solids. The shiny finish on glossy magazine-type paper is produced using a fine kaolin clay coating, which also becomes solid waste during recycling. This paper mill sludge consumes a large percentage of local landfill space for each and every year. Worse yet, some of the wastes are land spread on cropland as a disposal technique, raising concerns about trace contaminants building up in soil or running off into area lakes and streams. Some companies burn their sludge in incinerators, contributing to our serious air pollution problems. To reduce disposal and pollution problems emanating from these industrial wastes, it is most essential to develop profitable building materials from them. Keeping this in view, investigations were undertaken to produce low cast concrete by blending various ratios of cement with hypo sludge. This project is concerned with experimental investigation on strength of concrete and optimum percentage of the partial replacement by replacing cement

  5. Renovation of the facades of buildings 11, 12, 13 and 14

    CERN Multimedia

    TS/FM group

    2005-01-01

    Restoration work on the facades of Buildings 11, 12, 13 and 14 will begin on 6 June 2005 and is scheduled to be completed by the end of September. This work consists in replacing the windows of Building 14 and of the eastern facade of Building 13, and in repairing the windows of Buildings 11 and 12 and of the northern facade of Building 13. The concrete parts which have suffered carbonation damage will also be repaired. During this period, parking around these buildings will be restricted for safety reasons and for the requirements of the work site. All people working in these buildings or in their direct vicinity are kindly requested to comply with the signs in place. Thank you in advance for your understanding. Group TS/FM

  6. Renovation of the facades of buildings 11, 12, 13 and 14

    CERN Document Server

    TS/FM Group

    2005-01-01

    Restoration work on the facades of Buildings 11, 12, 13 and 14 will begin on 6 June 2005 and is scheduled to be completed by the end of September. This work consists in replacing the windows of Building 14 and of the eastern facade of Building 13, and in repairing the windows of Buildings 11 and 12 and of the northern facade of Building 13. The concrete parts which have suffered carbonation damage will also be repaired. During this period, parking around these buildings will be restricted for safety reasons and for the requirements of the work site. All people working in these buildings or in their direct vicinity are kindly requested to comply with the signs in place. Thank you in advance for your understanding. TS/FM Group

  7. Life cycle cost optimization of buildings with regard to energy use, thermal indoor environment and daylight

    DEFF Research Database (Denmark)

    Nielsen, Toke Rammer; Svendsen, Svend

    2002-01-01

    Buildings represent a large economical investment and have long service lives through which expenses for heating, cooling, maintenance and replacement depends on the chosen building design. Therefore, the building cost should not only be evaluated by the initial investment cost but rather by the ...... demand, thermal indoor environment and daylight. To illustrate the optimization method it is applied to performance optimization of an office room. The example shows that optimization is a valuable tool in the building design process....... life cycle cost taking all expenses in the buildings service life into consideration. Also the performance of buildings is important as the performance influences the comfort of the occupants, heating demand etc. Different performance requirements are stated in building codes, standards and by the...

  8. Topology Optimization of Building Blocks for Photonic Integrated Circuits

    DEFF Research Database (Denmark)

    Jensen, Jakob Søndergaard; Sigmund, Ole

    2005-01-01

    Photonic integrated circuits are likely candidates as high speed replacements for the standard electrical integrated circuits of today. However, in order to obtain a satisfactorily performance many design prob- lems that up until now have resulted in too high losses must be resolved. In this work...... we demonstrate how the method of topology optimization can be used to design a variety of high performance building blocks for the future circuits....

  9. Estimation uncertainty of direct monetary flood damage to buildings

    OpenAIRE

    B. Merz; H. Kreibich; A. Thieken; Schmidtke, R.

    2004-01-01

    Traditional flood design methods are increasingly supplemented or replaced by risk-oriented methods which are based on comprehensive risk analyses. Besides meteorological, hydrological and hydraulic investigations such analyses require the estimation of flood impacts. Flood impact assessments mainly focus on direct economic losses using damage functions which relate property damage to damage-causing factors. Although the flood damage of a building is influenced by many factors, usually only i...

  10. Existing buildings energy footprint (AE – an instrument for the evaluation of real PEC (building energy performance in real conditions of climatic and anthropic loads

    Directory of Open Access Journals (Sweden)

    Dan CONSTANTINESCU

    2010-01-01

    Full Text Available The energy footprint of a building is an operational characteristic specific to the building structure as well as to the energyrelated operational conditions of the building. This paper presents the experimental programme carried out on the support of the CE INCERC Bucharest experimental building in the 2008-2009 cold season and the results obtained in the form of the building energy footprint. At the same time, the building energy footprint before the energy-related upgrading (2003-2004 cold season are presented, as well as those subsequent to the energy-related upgrading (thermal protection, equipping with a ventilated solar space and heating system replacement. The character natural laws of the energy footprint are emphasized. This paper presents a theoretical substantiation of the use of the energy footprint method in the case of condominiums in the form of the operational method, which is useful in settling the functional characteristic in any climatic conditions and in any operational conditions.

  11. Buildings exposed to fire

    International Nuclear Information System (INIS)

    The 24 lectures presented to the colloquium cover the following subject fields: (1) Behaviour of structural components exposed to fire; (2) Behaviour of building materials exposed to fire; (3) Thermal processes; (4) Safety related, theoretical studies. (PW)

  12. Municipal Building Energy Usage

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This data set contains energy use data from 2009-2014 for 139 municipally operated buildings. Metrics include: Site & Source EUI, annual electricity, natural...

  13. Buildings Sector Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hostick, Donna J.; Nicholls, Andrew K.; McDonald, Sean C.; Hollomon, Jonathan B.

    2005-08-01

    A joint NREL, ORNL, and PNNL team conducted market analysis to help inform DOE/EERE's Weatherization and Intergovernmental Program planning and management decisions. This chapter presents the results of the market analysis for the Buildings sector.

  14. Helping clients build credit

    OpenAIRE

    Vikki Frank

    2007-01-01

    Until now people who repaid loans from community groups had not been on credit bureaus’ radar. Now Credit Builders Alliance is partnering with Experian to help clients of community lenders build strong credit histories.

  15. Building Materials in Arctic Climate

    DEFF Research Database (Denmark)

    Jensen, Ole Mejlhede

    2005-01-01

    Building in the artic requires special attention on the appropriateness of building materials. The harsh climate makes execution difficult and sets unusual requirements for the pure material properties. In addition, there is a lack of choice of good, natural building materials in the arctic. This...... results in high transport costs. The building materials situation in Greenland may potentially be improved by intensifying the reuse of building materials or by promoting the local production of building materials....

  16. Building Services Systems

    DEFF Research Database (Denmark)

    Zinzi, Michele; Romeo, Carlo; Thomsen, Kirsten Engelund;

    2015-01-01

    This guideline on Building Services Systems is one of four guidelines produced by the School of the Future project. The other three guidelines cover: Building Construction Elements, Improved Indoor Environmental Quality and Concepts for Zero Emission Schools. This guideline consists of the...... description of 5 main technologies: condensing boilers, heat pumps, ventilation systems, lighting and photovoltaic systems. For each technology chapter there is the same content list: an introduction, a brief technology description, some advantages and disadvantages, market penetration and utilisation, energy...

  17. Plataforma smart building

    OpenAIRE

    Cidrera Lopez, Alain

    2013-01-01

    The overall project is a system (hardware + software) that allows monitoring and control in a building / office different security systems, energy, communications, home automation, PKI's overall business that will increase all the efficiency of the building and the business and ensure the continuity of it. My participation in this Project will mainly focus on the development of hardware components, monitoring and control system (home automation, energy, safety control elements ...) and softwa...

  18. Green buildings pay

    DEFF Research Database (Denmark)

    Naboni, Emanuele; Edwards, Brian

    2012-01-01

    The new edition of ‘Green Buildings Pay’ authored by Brian Edwards and Emanuele Naboni explores the business and professional benefits which derive from architectural design driven by sustainability. With a new sub-title ‘Green Buildings Pay: design, productivity and ecology’ the book argues....... Branding via LEED and BREEAM has taken green ideas to China and other emerging economies. The globalization of sustainability and of architectural practice is an important strand of the new edition....

  19. Building Peaceful Borders

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    China's efforts to build a harmonious world begin with establishing peaceful borders with its neighbors China's recent contribution to the world of international relations is the promotion of "building a harmonious world together," put forward by President Hu Jintao at the 60th anniversary of the UN in September 2005. As the core of the country's peaceful foreign policy in the new era, this approach has been well received and widely discussed in the international community. Meanwhile, Chinese foreign pol...

  20. Iterative build OMIT maps: Map improvement by iterative model-building and refinement without model bias

    Energy Technology Data Exchange (ETDEWEB)

    Los Alamos National Laboratory, Mailstop M888, Los Alamos, NM 87545, USA; Lawrence Berkeley National Laboratory, One Cyclotron Road, Building 64R0121, Berkeley, CA 94720, USA; Department of Haematology, University of Cambridge, Cambridge CB2 0XY, England; Terwilliger, Thomas; Terwilliger, T.C.; Grosse-Kunstleve, Ralf Wilhelm; Afonine, P.V.; Moriarty, N.W.; Zwart, P.H.; Hung, L.-W.; Read, R.J.; Adams, P.D.

    2008-02-12

    A procedure for carrying out iterative model-building, density modification and refinement is presented in which the density in an OMIT region is essentially unbiased by an atomic model. Density from a set of overlapping OMIT regions can be combined to create a composite 'Iterative-Build' OMIT map that is everywhere unbiased by an atomic model but also everywhere benefiting from the model-based information present elsewhere in the unit cell. The procedure may have applications in the validation of specific features in atomic models as well as in overall model validation. The procedure is demonstrated with a molecular replacement structure and with an experimentally-phased structure, and a variation on the method is demonstrated by removing model bias from a structure from the Protein Data Bank.