WorldWideScience

Sample records for building roof-seal replacement

  1. Life cycle assessment: Existing building retrofit versus replacement

    Science.gov (United States)

    Darabi, Nura

    The embodied energy in building materials constitutes a large part of the total energy required for any building (Thormark 2001, 429). In working to make buildings more energy efficient this needs to be considered. Integrating considerations about life cycle assessment for buildings and materials is one promising way to reduce the amount of energy consumption being used within the building sector and the environmental impacts associated with that energy. A life cycle assessment (LCA) model can be utilized to help evaluate the embodied energy in building materials in comparison to the buildings operational energy. This thesis takes into consideration the potential life cycle reductions in energy and CO2 emissions that can be made through an energy retrofit of an existing building verses demolition and replacement with a new energy efficient building. A 95,000 square foot institutional building built in the 1960`s was used as a case study for a building LCA, along with a calibrated energy model of the existing building created as part of a previous Masters of Building Science thesis. The chosen case study building was compared to 10 possible improvement options of either energy retrofit or replacement of the existing building with a higher energy performing building in order to see the life cycle relationship between embodied energy, operational energy, and C02 emissions. As a result of completing the LCA, it is shown under which scenarios building retrofit saves more energy over the lifespan of the building than replacement with new construction. It was calculated that energy retrofit of the chosen existing institutional building would reduce the amount of energy and C02 emissions associated with that building over its life span.

  2. Life management for a non replaceable structure: the reactor building

    International Nuclear Information System (INIS)

    Torres, V.; Francia, L.

    1998-01-01

    Phase 1 of UNESA N.P.P. Lifetime Management Project identified and ranked important components, relative to plant life management. The list showed the Reactor Containment Structure in the third position, and thirteen concrete structures were among the list top twenty. Since the Reactor Containment Building, together with the Reactor Vessel, is the only non-replaceable plant component, and has a big impact on the plant technical life, there is an increasing interest on understanding its behavior to maintain structural integrity. This paper presents: a) IAEA (International Atomic Energy Agency) Coordinated Research Program experiences and studies. Under this Program, international experts address the most frequent degradation mechanisms affecting the containment building. b) IAEA Aging Management Program adapted to our plants. The paper addresses the aging mechanisms affecting the concrete structures, reinforcing steel and prestress systems as well as the aging management programs and the mitigation and control methods. Finally, this paper presents a new module called STRUCTURES, included in phase 2 of the above mentioned project, which will monitor and document the different aging mechanisms and management programs described in item b) regarding the Reactor Containment Building (concrete liner, post stressing system, anchor elements). This module will also support the Maintenance Rule related practices. (Author)

  3. Financing New Technologies, Equipment/Furniture Replacement, and Building Renovation: A Survey Report.

    Science.gov (United States)

    Shirk, Gary M.

    1984-01-01

    Reports results of survey of methods used by 77 North American academic and public libraries to finance implementation of new technologies, replace equipment and furniture, and renovate buildings. Financing methods used, frequency of use, choice, and range of methods are discussed. Eight references and list of survey participants are appended.…

  4. Replacement

    Directory of Open Access Journals (Sweden)

    S. Radhakrishnan

    2014-03-01

    Full Text Available The fishmeal replaced with Spirulina platensis, Chlorella vulgaris and Azolla pinnata and the formulated diet fed to Macrobrachium rosenbergii postlarvae to assess the enhancement ability of non-enzymatic antioxidants (vitamin C and E, enzymatic antioxidants (superoxide dismutase (SOD and catalase (CAT and lipid peroxidation (LPx were analysed. In the present study, the S. platensis, C. vulgaris and A. pinnata inclusion diet fed groups had significant (P < 0.05 improvement in the levels of vitamins C and E in the hepatopancreas and muscle tissue. Among all the diets, the replacement materials in 50% incorporated feed fed groups showed better performance when compared with the control group in non-enzymatic antioxidant activity. The 50% fishmeal replacement (best performance diet fed groups taken for enzymatic antioxidant study, in SOD, CAT and LPx showed no significant increases when compared with the control group. Hence, the present results revealed that the formulated feed enhanced the vitamins C and E, the result of decreased level of enzymatic antioxidants (SOD, CAT and LPx revealed that these feeds are non-toxic and do not produce any stress to postlarvae. These ingredients can be used as an alternative protein source for sustainable Macrobrachium culture.

  5. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, J.; Henderson, H.; Varshney, K.

    2014-09-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  6. Studies on use of Copper Slag as Replacement Material for River Sand in Building Constructions

    Science.gov (United States)

    Madheswaran, C. K.; Ambily, P. S.; Dattatreya, J. K.; Rajamane, N. P.

    2014-09-01

    This work focuses on the use of copper slag, as a partial replacement of sand for use in cement concrete and building construction. Cement mortar mixtures prepared with fine aggregate made up of different proportions of copper slag and sand were tested for use as masonry mortars and plastering. Three masonry wall panels of dimensions 1 × 1 m were plastered. The studies showed that although copper slag based mortar is suitable for plastering, with the increase in copper slag content, the wastage due to material rebounding from the plastered surfaces increases. It is therefore suggested that the copper slag can be used for plastering of floorings and horizontal up to 50 % by mass of the fine aggregate, and for vertical surfaces, such as, brick/block walls it can be used up to 25 %. In this study on concrete mixtures were prepared with two water cement ratios and different proportions of copper slag ranging from 0 % (for the control mix) to 100 % of fine aggregate. The Concrete mixes were evaluated for workability, density, and compressive strength.

  7. CEO- CNE Relationships: Building an Evidence-Base of Chief Nursing Executive Replacement Costs

    OpenAIRE

    Sredl, Darlene; Peng, Niang-Huei

    2010-01-01

    OBJECTIVE: Explore professional relationships between Chief Nurse Executives (CNEs) and Chief Executive Officers (CEOs); CNE ethnic diversity; and CNE replacement costs. BACKGROUND: Theoretical frameworks - Marilyn Ray's Theory of Bureaucratic Caring, and Turkel's Theory of Relational Complexity espousing economic as well as caring variables. METHODS: Exploratory mixed-method descriptive design using CNE mailed survey. RESULTS: CNE- cited opportunities for maintaining a positive relationship ...

  8. CEO- CNE relationships: building an evidence-base of chief nursing executive replacement costs.

    Science.gov (United States)

    Sredl, Darlene; Peng, Niang-Huei

    2010-06-03

    Explore professional relationships between Chief Nurse Executives (CNEs) and Chief Executive Officers (CEOs); CNE ethnic diversity; and CNE replacement costs. Theoretical frameworks - Marilyn Ray's Theory of Bureaucratic Caring, and Turkel's Theory of Relational Complexity espousing economic as well as caring variables. Exploratory mixed-method descriptive design using CNE mailed survey. CNE- cited opportunities for maintaining a positive relationship with the CEO: respect for CEO; goal- sharing (r=.782, prelationship (r= .718, pmaintaining specific roles (r= .261, prelationship with CEO (r=.254, prelationships have identified cohesive factors that may contribute to CNE longevity in position; an ethically diverse CNE deficit exists; and, CNE turnover and vacancy rates impact an organization's financial health and quality of care.

  9. Characterization study on secondary sewage sludge for replacement in building materials

    Science.gov (United States)

    Kadir, Aeslina Abdul; Sarani, Noor Amira; Aziz, Nurul Sazwana A.; Hamdan, Rafidah; Abdullah, Mohd Mustafa Al Bakri

    2017-09-01

    Recently, environmental issues continually increased since expanded in industrial development and grown in population. Regarding to this activity, it will cause lack management of waste such as solid waste from wastewater treatment plant called sewage sludge. This research presents the characteristic study of sewage sludge, regardless of whether it is appropriate or not to be applied as building materials. The sewage sludge samples were collected from secondary treatment at Senggarang and Perwira under Indah Water Konsortium (IWK) treatment plant. Raw materials were tested with X-ray Fluorescence (XRF) and Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES) in order to determine the composition of sewage sludge and heavy metal concentration contains in sewage sludge. From the study, it was found that sewage sludge contained high amount of Silica Oxide (SiO2) with 13.6%, Sulphur Trioxide (SO3) with 12.64% and Iron Oxide (Fe2O3) with 8.7% which is similar in clay. In addition, sewage sludge also high in Iron (Fe) with 276.2 mg/L followed by Zinc (Zn) with concentration 45.41 mg/L which sewage sludge cannot be directly disposed to landfill. Results from this study demonstrated that sewage sludge has high possibility to be reused as alternative building materials such as bricks and have compatible chemical composition with clay.

  10. Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    2003-01-01

    NNSA, an agency within DOE, proposes to replace the Chemistry and Metallurgy Research (CMR) Building at Los Alamos National Laboratory (LANL). The CMRR EIS examines the potential environmental impacts associated with the Proposed Action of consolidating and relocating the mission-critical CMR capabilities from a degraded building to a new modern building(s). The existing CMR Building, constructed in the early 1950s, houses most of LANL's analytical chemistry and materials characterization AC and MC capabilities. Other capabilities at the CMR Building include actinide processing, waste characterization, and nondestructive analysis that support a variety of NNSA and DOE nuclear materials management programs. In 1992, DOE initiated planning and implementation of CMR Building upgrades to address specific safety, reliability, consolidation, and security and safeguards issues. Later, in 1997 and 1998, a series of operational, safety, and seismic issues surfaced regarding the long-term viability of the CMR Building. Because of these issues, DOE determined that the extensive upgrades originally planned would be much more expensive and time consuming and of only marginal effectiveness. As a result, DOE decided to perform only the upgrades necessary to ensure the safe and reliable operation of the CMR Building through 2010 and to seek an alternative path for long-term reliability. The CMRR EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with the Proposed Action. The Proposed Action is to replace the CMR Building. The Preferred Alternative is to construct a new CMRR Facility at Technical Area (TA) 55, consisting of two or three buildings. One of the new buildings would provide space for administrative offices and support functions. The other building(s) would provide secure laboratory spaces for research and analytical support activities. The buildings would be expected to operate for a minimum of 50 years. Tunnels could be

  11. Proposed replacement and operation of the anhydrous hydrogen fluoride supply and fluidized-bed chemical processing systems at Building 9212, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    The US Department of Energy (DOE) proposes to replace the existing anhydrous hydrogen fluoride (AHF) supply and fluidized-bed reactor systems for the Weapons Grade Highly Enriched Uranium Chemical Recovery and Recycle Facility, Building 9212, which is located within the Y-12 Plant on DOE's Oak Ridge Reservation in Oak Ridge, Tennessee. The proposed replacement system would be based upon modern design criteria and safety analyses. The replacement AHF supply and distribution system equipment would be located on the existing Dock 8/8A at Building 9212. Utilities would be extended to the dock to service the process equipment. The following process equipment modules would be prefabricated for installation at the modified dock: an AHF cylinder enclosure, an AHF supply manifold and vaporizer module, an AHF sump tank and transfer skid, and an AHF supply off-gas scrubber assembly module. The fluidized-bed reactor system would be constructed in an area adjacent to the existing system in Building 9212. The replacement equipment would consist of a new reduction fluidized-bed reactor, a hydrofluorination fluidized-bed reactor, and associated air emission control equipment. The no-action alternative, which is the continued operation of the existing AHF supply and fluidized-bed reactor systems, was also evaluated

  12. Building

    OpenAIRE

    Seavy, Ryan

    2014-01-01

    Building for concrete is temporary. The building of wood and steel stands against the concrete to give form and then gives way, leaving a trace of its existence behind. Concrete is not a building material. One does not build with concrete. One builds for concrete. MARCH

  13. Replacement of Eocene white sandy limestone in historical buildings : over 100 years of practice in the Netherlands

    NARCIS (Netherlands)

    Quist, W.J.; Nijland, T.G.; Hees, R.P.J. van

    2013-01-01

    This paper discusses the replacement of white sandy limestone (Gobertange and Lede or Balegem) in the Netherlands in (successive) restorations from the mid-19th century onwards. White sandy limestone, transported from the southern part of the Low Countries (now Belgium), was extensively used in the

  14. Identifying and Solving Lead Issues from Water Systems with Materials/Device Replacement in Schools and other Buildings

    Science.gov (United States)

    Identifying and assessing lead contamination and exposure potential in single-family residences is difficult enough, but doing the same kind of assessment and remediation in buildings, schools, and day care centers is even more challenging. It is of particular importance because ...

  15. Identifying and Solving Lead Issues from Water Systems with Materials/Device Replacement in Schools and other Buildings - slides

    Science.gov (United States)

    Identifying and assessing lead contamination and exposure potential in single-family residences is difficult enough, but doing the same kind of assessment and remediation in buildings, schools, and day care centers is even more challenging. It is of particular importance because ...

  16. Building and validation of a prognostic model for predicting extracorporeal circuit clotting in patients with continuous renal replacement therapy.

    Science.gov (United States)

    Fu, Xia; Liang, Xinling; Song, Li; Huang, Huigen; Wang, Jing; Chen, Yuanhan; Zhang, Li; Quan, Zilin; Shi, Wei

    2014-04-01

    To develop a predictive model for circuit clotting in patients with continuous renal replacement therapy (CRRT). A total of 425 cases were selected. 302 cases were used to develop a predictive model of extracorporeal circuit life span during CRRT without citrate anticoagulation in 24 h, and 123 cases were used to validate the model. The prediction formula was developed using multivariate Cox proportional-hazards regression analysis, from which a risk score was assigned. The mean survival time of the circuit was 15.0 ± 1.3 h, and the rate of circuit clotting was 66.6 % during 24 h of CRRT. Five significant variables were assigned a predicting score according to the regression coefficient: insufficient blood flow, no anticoagulation, hematocrit ≥0.37, lactic acid of arterial blood gas analysis ≤3 mmol/L and APTT R (2) = 0.232; P = 0.301). A risk score that includes the five above-mentioned variables can be used to predict the likelihood of extracorporeal circuit clotting in patients undergoing CRRT.

  17. Replacement of the feedwater pipe system in reactor building outside containment at the nuclear power plant Philippsburg; Austausch der Speisewasserleitung im Reaktorgebaeude ausserhalb SHB im Kernkraftwerk Philippsburg I

    Energy Technology Data Exchange (ETDEWEB)

    Kessler, A. [Energie-Versorgung Schwaben AG, Stuttgart (Germany); Labes, M. [Siemens AG Unternehmensbereich KWU, Offenbach am Main (Germany); Schwenk, B. [Kernkraftwerk Philippsburg GmbH (Germany)

    1998-11-01

    After full replacement of the feedwater pipe system during the inspection period in 1997, combined with a modern materials, manufacturing and analysis concept, the entire pipe system of the water/steam cycle in the reactor building of KKP 1 now consists of high-toughness materials. The safety level of the entire plant has been increased by leaving aside postulation of F2 breaks in the reactor building and providing for protection against 0.1 leaks. Based on fluid-dynamic calculations for the cases of pump failure and pipe break, as well as pipe system calculations in 5 extensive calculation cycles, about 130 documents were filed for inspection and approval (excluding preliminary test documents on restraints). Points of main interest for safety analysis in this context were the optimised closing performance of the 3rd check valves and the integrity of the nozzle region at the RPV. (oirg./CB) [Deutsch] Durch den Restaustausch der Speisewasserleitungen in der Revision 1997, verbunden mit einem modernen Werkstoff-, Fertigungs- und Nachweiskonzept, sind im Reaktorgebaeude von KKP 1 in den Hauptleitungen des Wasser-Dampf-Kreislaufes nur noch hochzaehe Werkstoffe eingesetzt. Durch den Verzicht auf das Postulat von 2F-Bruechen im Reaktorgebaeude und durch die Auslegung gegen 0,1F-Lecks wird das Sicherheitsniveau der Anlage insgesamt gesteigert. Ausgehend von fluiddynamischen Berechnungen fuer Pumpenausfall und Rohrbruch sowie Rohrsystem-Berechnungen in 5 umfangreichen Berechnungskreisen wurden fuer die Genehmigung und Begutachtung ca. 130 Unterlagen (ohne Halterungs-Vorpruefunterlagen) eingereicht und vom Gutachter geprueft. Schwerpunkte der Nachweisfuehrung waren die Optimierung des Schliessverhaltens der 3. Rueckschlagarmaturen sowie der Integritaetsnachweis des RDB-Anschlusses. (orig./MM)

  18. Ankle replacement

    Science.gov (United States)

    Ankle arthroplasty - total; Total ankle arthroplasty; Endoprosthetic ankle replacement; Ankle surgery ... Ankle replacement surgery is most often done while you are under general anesthesia. This means you will ...

  19. Knee Replacement

    Science.gov (United States)

    Knee replacement is surgery for people with severe knee damage. Knee replacement can relieve pain and allow you to ... Your doctor may recommend it if you have knee pain and medicine and other treatments are not ...

  20. 振冲碎石桩加固高层建筑粉砂土地基实例分析%Case Study on Improving Silty Sand Foundation of Tall Building by Vibro-replacement Stone Column

    Institute of Scientific and Technical Information of China (English)

    谢新宇; 应宏伟; 夏建中

    2001-01-01

    In this paper, the case studies of two tall buildings built on silty sand improved by vibro-replacement stone column in Hangzhou are reported. The design and computation method for vibro-replacement stone column composite foundation are introduced. Based on field testing results,the construction techniques of vibro-replacement stone column and the appraisement of improvement effect are discussed. It is the first time that the vibro-replacement stone column method has been successfully applied to improve silty sand foundation of tall building in Hangzhou.%本文介绍杭州两座高层建筑物采用振冲碎石桩加固粉砂土地基的工程实例。结合有关现场测试成果,探讨了高层建筑振冲碎石桩地基设计计算、振冲碎石桩施工控制和加固效果评价等有关问题。为振冲碎石桩在同类地基中的推广应用提供一些成功经验。

  1. Application of DEN refinement and automated model building to a difficult case of molecular-replacement phasing: the structure of a putative succinyl-diaminopimelate desuccinylase from Corynebacterium glutamicum.

    Science.gov (United States)

    Brunger, Axel T; Das, Debanu; Deacon, Ashley M; Grant, Joanna; Terwilliger, Thomas C; Read, Randy J; Adams, Paul D; Levitt, Michael; Schröder, Gunnar F

    2012-04-01

    Phasing by molecular replacement remains difficult for targets that are far from the search model or in situations where the crystal diffracts only weakly or to low resolution. Here, the process of determining and refining the structure of Cgl1109, a putative succinyl-diaminopimelate desuccinylase from Corynebacterium glutamicum, at ∼3 Å resolution is described using a combination of homology modeling with MODELLER, molecular-replacement phasing with Phaser, deformable elastic network (DEN) refinement and automated model building using AutoBuild in a semi-automated fashion, followed by final refinement cycles with phenix.refine and Coot. This difficult molecular-replacement case illustrates the power of including DEN restraints derived from a starting model to guide the movements of the model during refinement. The resulting improved model phases provide better starting points for automated model building and produce more significant difference peaks in anomalous difference Fourier maps to locate anomalous scatterers than does standard refinement. This example also illustrates a current limitation of automated procedures that require manual adjustment of local sequence misalignments between the homology model and the target sequence.

  2. Replacing penalties

    Directory of Open Access Journals (Sweden)

    Vitaly Stepashin

    2017-01-01

    Full Text Available УДК 343.24The subject. The article deals with the problem of the use of "substitute" penalties.The purpose of the article is to identify criminal and legal criteria for: selecting the replacement punishment; proportionality replacement leave punishment to others (the formalization of replacement; actually increasing the punishment (worsening of legal situation of the convicted.Methodology.The author uses the method of analysis and synthesis, formal legal method.Results. Replacing the punishment more severe as a result of malicious evasion from serving accused designated penalty requires the optimization of the following areas: 1 the selection of a substitute punishment; 2 replacement of proportionality is serving a sentence other (formalization of replacement; 3 ensuring the actual toughening penalties (deterioration of the legal status of the convict. It is important that the first two requirements pro-vide savings of repression in the implementation of the replacement of one form of punishment to others.Replacement of punishment on their own do not have any specifics. However, it is necessary to compare them with the contents of the punishment, which the convict from serving maliciously evaded. First, substitute the punishment should assume a more significant range of restrictions and deprivation of certain rights of the convict. Second, the perfor-mance characteristics of order substitute the punishment should assume guarantee imple-mentation of the new measures.With regard to replacing all forms of punishment are set significant limitations in the application that, in some cases, eliminates the possibility of replacement of the sentence, from serving where there has been willful evasion, a stricter measure of state coercion. It is important in the context of the topic and the possibility of a sentence of imprisonment as a substitute punishment in cases where the original purpose of the strict measures excluded. It is noteworthy that the

  3. Knee Replacement

    Science.gov (United States)

    ... days. Medications prescribed by your doctor should help control pain. During the hospital stay, you'll be encouraged to move your ... exercise your new knee. After you leave the hospital, you'll continue physical ... mobility and a better quality of life. And most knee replacements can be ...

  4. Replacement rod

    International Nuclear Information System (INIS)

    Hatfield, S.C.

    1989-01-01

    This patent describes in an elongated replacement rod for use with fuel assemblies of the type having two end fittings connected by guide tubes with a plurality of rod and guide tube cell defining spacer grids containing rod support features and mixing vanes. The grids secured to the guide tubes in register between the end fittings at spaced intervals. The fuel rod comprising: an asymmetrically beveled tip; a shank portion having a straight centerline; and a permanently diverging portion between the tip and the shank portion

  5. Shoulder replacement - discharge

    Science.gov (United States)

    Total shoulder arthroplasty - discharge; Endoprosthetic shoulder replacement - discharge; Partial shoulder replacement - discharge; Partial shoulder arthroplasty - discharge; Replacement - shoulder - discharge; Arthroplasty - shoulder - discharge

  6. Hip joint replacement

    Science.gov (United States)

    Hip arthroplasty; Total hip replacement; Hip hemiarthroplasty; Arthritis - hip replacement; Osteoarthritis - hip replacement ... Your hip joint is made up of 2 major parts. One or both parts may be replaced during surgery: ...

  7. Electric efficiency in lighting system and air conditioners replacement and automation of air conditioners split type in public buildings; Eficiencia eletrica na substituicao do sistema de iluminacao e de condicionadores de ar e automacao do sistema de condicionadores de ar tipo split em predios publicos

    Energy Technology Data Exchange (ETDEWEB)

    Vasconcellos, Arnulfo Barroso de; Apolonio, Roberto; Silva, Luciana Oliveira da; Gomes, Fernanda Leles [Universidade Federal de Mato Grosso (UFMT), MT (Brazil); Malheiro, Teresa Irene Ribeiro de Carvalho [Instituto Federal de Educacao, Ciencia e Tecnologia de Mato Grosso (IFMT), MT (Brazil); Barros, Regiane Silva de [Universidade Estadual de Campinas (UNICAMP), SP (Brazil)

    2010-07-01

    The reduction in expenditure on electricity is a major benefit not only consumers but also to utilities. In this context, this article examines the process of replacing the system of internal lighting, window type air conditioners and automation of Split type air conditioners from buildings of public institutions of the state of Mato Grosso during 2009 year and verifies the reduction in annual consumption of electric power and demand active power. Thus, measurements and calculations performed are presented for the interior lighting systems and air conditioners of these buildings before and after implementation of the process of replacing the system of internal lighting and window type air conditioners and automation of Split type air conditioners. This work is the result of integration among the Dealer Network Energy Rede Cemat, the Federal University of Mato Grosso (UFMT) and the Administration of all public buildings, where the academy answered these real issues, solving the specific problem presented. (author)

  8. Transcatheter aortic valve replacement

    Science.gov (United States)

    ... gov/ency/article/007684.htm Transcatheter aortic valve replacement To use the sharing features on this page, please enable JavaScript. Transcatheter aortic valve replacement (TAVR) is surgery to replace the aortic valve. ...

  9. Hip Replacement Surgery

    Science.gov (United States)

    ... Outreach Initiative Breadcrumb Home Health Topics English Español Hip Replacement Surgery Basics In-Depth Download Download EPUB ... PDF What is it? Points To Remember About Hip Replacement Surgery Hip replacement surgery removes damaged or ...

  10. Nicotine replacement therapy

    Science.gov (United States)

    Smoking cessation - nicotine replacement; Tobacco - nicotine replacement therapy ... Before you start using a nicotine replacement product, here are some things to know: The more cigarettes you smoke, the higher the dose you may need to ...

  11. Defining line replaceable units

    NARCIS (Netherlands)

    Parada Puig, J. E.; Basten, R. J I

    2015-01-01

    Defective capital assets may be quickly restored to their operational condition by replacing the item that has failed. The item that is replaced is called the Line Replaceable Unit (LRU), and the so-called LRU definition problem is the problem of deciding on which item to replace upon each type of

  12. Building founding method

    International Nuclear Information System (INIS)

    Tateno, Seiya; Hirako, Shizuka.

    1996-01-01

    The lower portion of a reactor building is buried at a level of a base rock. In the step of building construction, the base rock around the building is dug of keeping a construction space. The base rock present between the digging line and the building is replaced with an artificial base rock comprising aggregates and cement having a building constraining force substantially equal with that of the lower supporting base rock to obtain constraining force for the side portion of the building. The building itself is made of concrete steels. As the material for replacing the base rock between the digging line and the building, non-reinforced concrete having no steels may provide sufficient function. The burying depth is determined so as to align the surface of the base rock with the level of the base floor of the building. With such procedures, since it is not necessary to increase the area of the lower portion of the building, the amount of the materials for the building can be reduced. In addition, the earthquakes stability can be ensured without changing the shape of the building. (I.N.)

  13. Ankle replacement - discharge

    Science.gov (United States)

    ... total - discharge; Total ankle arthroplasty - discharge; Endoprosthetic ankle replacement - discharge; Osteoarthritis - ankle ... You had an ankle replacement. Your surgeon removed and reshaped ... an artificial ankle joint. You received pain medicine and were ...

  14. Artificial Disc Replacement

    Science.gov (United States)

    ... Spondylolisthesis BLOG FIND A SPECIALIST Treatments Artificial Disc Replacement (ADR) Patient Education Committee Jamie Baisden The disc ... Disc An artificial disc (also called a disc replacement, disc prosthesis or spine arthroplasty device) is a ...

  15. Partial knee replacement - slideshow

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/presentations/100225.htm Partial knee replacement - series—Normal anatomy To use the sharing ... A.M. Editorial team. Related MedlinePlus Health Topics Knee Replacement A.D.A.M., Inc. is accredited ...

  16. Flued head replacement alternatives

    International Nuclear Information System (INIS)

    Smetters, J.L.

    1987-01-01

    This paper discusses flued head replacement options. Section 2 discusses complete flued head replacement with a design that eliminates the inaccessible welds. Section 3 discusses alternate flued head support designs that can drastically reduce flued head installation costs. Section 4 describes partial flued head replacement designs. Finally, Section 5 discusses flued head analysis methods. (orig./GL)

  17. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  18. Implementing Replacement Cost Accounting

    Science.gov (United States)

    1976-12-01

    cost accounting Clickener, John Ross Monterey, California. Naval Postgraduate School http://hdl.handle.net/10945/17810 Downloaded from NPS Archive...Calhoun IMPLEMENTING REPLACEMENT COST ACCOUNTING John Ross CHckener NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS IMPLEMENTING REPLACEMENT COST ...Implementing Replacement Cost Accounting 7. AUTHORS John Ross Clickener READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER 9. TYRE OF

  19. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  20. Aggression Replacement Training and Childhood Trauma

    Science.gov (United States)

    Amendola, A. Mark; Oliver, Robert W.

    2013-01-01

    Aggression Replacement Training (ART) was developed by the late Arnold Goldstein of Syracuse University to teach positive alternatives to children and youth with emotional and behavioral problems (Glick & Gibbs, 2011; Goldstein, Glick, & Gibbs, 1998). ART provides cognitive, affective, and behavioral interventions to build competence in…

  1. Aeronautical Information System Replacement -

    Data.gov (United States)

    Department of Transportation — Aeronautical Information System Replacement is a web-enabled, automation means for the collection and distribution of Service B messages, weather information, flight...

  2. Radiation Source Replacement Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  3. Could wind replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    This article aims at assessing the situation produced by a total replacement of nuclear energy by wind energy, while facing consumption demand at any moment, notably in December. The authors indicate the evolution of the French energy mix during December 2016, and the evolution of the rate between wind energy production and the sum of nuclear and wind energy production during the same month, and then give briefly some elements regarding necessary investments in wind energy to wholly replace nuclear energy. According to them, such a replacement would be ruinous

  4. Slab replacement maturity guidelines.

    Science.gov (United States)

    2014-04-01

    This study investigated the use of maturity method to determine early age strength of concrete in slab : replacement application. Specific objectives were (1) to evaluate effects of various factors on the compressive : maturity-strength relationship ...

  5. Partial knee replacement

    Science.gov (United States)

    ... good range of motion in your knee. The ligaments in your knee are stable. However, most people with knee arthritis have a surgery called a total knee arthroplasty (TKA). Knee replacement is most often done in people age 60 ...

  6. Carbohydrates as Fat Replacers.

    Science.gov (United States)

    Peng, Xingyun; Yao, Yuan

    2017-02-28

    The overconsumption of dietary fat contributes to various chronic diseases, which encourages attempts to develop and consume low-fat foods. Simple fat reduction causes quality losses that impede the acceptance of foods. Fat replacers are utilized to minimize the quality deterioration after fat reduction or removal to achieve low-calorie, low-fat claims. In this review, the forms of fats and their functions in contributing to food textural and sensory qualities are discussed in various food systems. The connections between fat reduction and quality loss are described in order to clarify the rationales of fat replacement. Carbohydrate fat replacers usually have low calorie density and provide gelling, thickening, stabilizing, and other texture-modifying properties. In this review, carbohydrates, including starches, maltodextrins, polydextrose, gums, and fibers, are discussed with regard to their interactions with other components in foods as well as their performances as fat replacers in various systems.

  7. Hip joint replacement - slideshow

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/presentations/100006.htm Hip joint replacement - series—Normal anatomy To use the ... to slide 5 out of 5 Overview The hip joint is made up of two major parts: ...

  8. Tool Inventory and Replacement

    Science.gov (United States)

    Bear, W. Forrest

    1976-01-01

    Vocational agriculture teachers are encouraged to evaluate curriculum offerings, the new trends in business and industry, and develop a master tool purchase and replacement plan over a 3- to 5-year period. (HD)

  9. Knee joint replacement

    Science.gov (United States)

    ... to make everyday tasks easier. Practice using a cane, walker , crutches , or a wheelchair correctly. On the ... ask your doctor Knee joint replacement - discharge Preventing falls Preventing falls - what to ask your doctor Surgical ...

  10. Product Platform Replacements

    DEFF Research Database (Denmark)

    Sköld, Martin; Karlsson, Christer

    2012-01-01

    . To shed light on this unexplored and growing managerial concern, the purpose of this explorative study is to identify operational challenges to management when product platforms are replaced. Design/methodology/approach – The study uses a longitudinal field-study approach. Two companies, Gamma and Omega...... replacement was chosen in each company. Findings – The study shows that platform replacements primarily challenge managers' existing knowledge about platform architectures. A distinction can be made between “width” and “height” in platform replacements, and it is crucial that managers observe this in order...... to challenge their existing knowledge about platform architectures. Issues on technologies, architectures, components and processes as well as on segments, applications and functions are identified. Practical implications – Practical implications are summarized and discussed in relation to a framework...

  11. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.

    1999-01-01

    As a consequences of the government decision in September 1997. ANSTO established a replacement research reactor project to manage the procurement of the replacement reactor through the necessary approval, tendering and contract management stages This paper provides an update of the status of the project including the completion of the Environmental Impact Statement. Prequalification and Public Works Committee processes. The aims of the project, management organisation, reactor type and expected capabilities are also described

  12. Strategic vehicle fleet management - the replacement problem

    Directory of Open Access Journals (Sweden)

    Adam Redmer

    2016-03-01

    Full Text Available Background: Fleets constitute the most important production means in transportation. Their appropriate management is crucial for all companies having transportation duties. The paper is the third one of a series of three papers that the author dedicates to the strategic vehicle fleet management topic. Material and methods: The paper discusses ways of building replacement strategies for companies' fleets of vehicles. It means deciding for how long to exploit particular vehicles in a fleet (the fleet replacement problem - FR. The essence of this problem lies in the minimization of vehicle / fleet exploitation costs by balancing ownership and utilization costs and taking into account budget limitations. In the paper an original mathematical model (an optimization method allowing for the FR analysis is proposed. Results: An application of the proposed optimization method in a real-life decision situation (the case study within the Polish environment and the obtained solution are presented. The solution shows that there exist optimal exploitation periods of particular vehicles in a fleet. However, combination of them gives a replacement plan for an entire fleet violating budget constraints. But it is possible to adjust individual age to replacement of particular vehicles to fulfill budget constraints without losing economical optimality of a developed replacement plan for an entire fleet. Conclusions: The paper is the last one of a series of three papers that the author dedicated to the strategic vehicle fleet management topic including the following managerial decision problems: MAKE-or-BUY, sizing / composition and replacement.

  13. Race to replace internet

    CERN Multimedia

    Ahuja, A

    2000-01-01

    British scientists are urging the Government to support a project to build a computing 'Grid' to succeed the Internet. They believe that fortunes await the countries and companies who commit themselves from the very beginning (1 page).

  14. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  15. Thyroid hormone replacement therapy

    NARCIS (Netherlands)

    Wiersinga, W. M.

    2001-01-01

    Thyroid hormone replacement has been used for more than 100 years in the treatment of hypothyroidism, and there is no doubt about its overall efficacy. Desiccated thyroid contains both thyroxine (T(4)) and triiodothyronine (T(3)); serum T(3) frequently rises to supranormal values in the absorption

  16. Can photovoltaic replace nuclear?

    International Nuclear Information System (INIS)

    2017-01-01

    As the French law on energy transition for a green growth predicts that one third of nuclear energy production is to be replaced by renewable energies (wind and solar) by 2025, and while the ADEME proposes a 100 per cent renewable scenario for 2050, this paper proposes a brief analysis of the replacement of nuclear energy by solar photovoltaic energy. It presents and discusses some characteristics of photovoltaic production: production level during a typical day for each month (a noticeable lower production in December), evolution of monthly production during a year, evolution of the rate between nuclear and photovoltaic production. A cost assessment is then proposed for energy storage and for energy production, and a minimum cost of replacement of nuclear by photovoltaic is assessed. The seasonal effect is outlined, as well as the latitude effect. Finally, the authors outline the huge cost of such a replacement, and consider that public support to new photovoltaic installations without an at least daily storage mean should be cancelled

  17. Fluorescent Lamp Replacement Study

    Science.gov (United States)

    2017-07-01

    not be cited for purposes of advertisement. DISPOSITION INSTRUCTIONS: Destroy this document when no longer needed. Do not return to the... recycling , and can be disposed safely in a landfill. (2) LEDs offer reduced maintenance costs and fewer bulb replacements, significantly reducing... recycling . Several fixtures, ballasts and energy efficient fluorescent bulbs that were determined to be in pristine condition were returned to ATC

  18. Replacing Recipe Realism

    OpenAIRE

    Saatsi, J

    2017-01-01

    Many realist writings exemplify the spirit of ‘recipe realism’. Here I characterise recipe realism, challenge it, and propose replacing it with ‘exemplar realism’. This alternative understanding of realism is more piecemeal, robust, and better in tune with scientists’ own attitude towards their best theories, and thus to be preferred.

  19. Glaucoma after corneal replacement.

    Science.gov (United States)

    Baltaziak, Monika; Chew, Hall F; Podbielski, Dominik W; Ahmed, Iqbal Ike K

    Glaucoma is a well-known complication after corneal transplantation surgery. Traditional corneal transplantation surgery, specifically penetrating keratoplasty, has been slowly replaced by the advent of new corneal transplantation procedures: primarily lamellar keratoplasties. There has also been an emergence of keratoprosthesis implants for eyes that are high risk of failure with penetrating keratoplasty. Consequently, there are different rates of glaucoma, pathogenesis, and potential treatment in the form of medical, laser, or surgical therapy. Copyright © 2017 Elsevier Inc. All rights reserved.

  20. The replacement research reactor

    International Nuclear Information System (INIS)

    Cameron, R.; Horlock, K.

    2001-01-01

    The contract for the design, construction and commissioning of the Replacement Research Reactor was signed in July 2000. This was followed by the completion of the detailed design and an application for a construction licence was made in May 2001. This paper will describe the main elements of the design and their relation to the proposed applications of the reactor. The future stages in the project leading to full operation are also described

  1. Apparatus for fuel replacement

    International Nuclear Information System (INIS)

    Imada, Takahiko.

    1974-01-01

    Object: To support a telescope mast such that no deforming load is applied to it even during massive vibration, it is held fixed at the time of fuel replacement to permit satisfactory remote control operation by automatic operation. Structure: The body of the fuel replacement apparatus is provided with telescope mast fixing means comprising a slide base supported for reciprocal movement with respect to a telescope mast, an operating arm pivoted at the slide base, a wrist member mounted on the free end of the operating arm and an engagement member for restricting the slide base and operating arm at the time of loading and unloading the fuel. When loading and unloading the fuel, the slide base and operating arm are restrained by the engagement member to reliably restrict the vibration of the telescope mast. When the fuel replacement apparatus is moved, the means provided on the operating arm is smoothly displaced to follow the swing (vibration) of the telescope mast to prevent the deforming load from being applied to the support portion or other areas. The wrist member supports the telescope mast such that it can be rotated while restraining movement in the axial direction, and it is provided with revolution drive means for rotating the telescope mast under remote control. (Kamimura, M.)

  2. Building Languages

    Science.gov (United States)

    ... Glossary Contact Information Information For… Media Policy Makers Building Languages Recommend on Facebook Tweet Share Compartir Communicating ... any speech and only very loud sounds. Close × “Building Blocks” “Building Blocks” refers to the different skills ...

  3. Toleration, Synthesis or Replacement?

    DEFF Research Database (Denmark)

    Holtermann, Jakob v. H.; Madsen, Mikael Rask

    2016-01-01

    , in order to answer is not yet another partisan suggestion, but rather an attempt at making intelligible both the oppositions and the possibilities of synthesis between normative and empirical approaches to law. Based on our assessment and rational reconstruction of current arguments and positions, we...... therefore outline a taxonomy consisting of the following three basic, ideal-types in terms of the epistemological understanding of the interface of law and empirical studies: toleration, synthesis and replacement. This tripartite model proves useful with a view to teasing out and better articulating...

  4. Upgrade, rebuild or replace?

    International Nuclear Information System (INIS)

    Forbes, C.A.

    1990-01-01

    Ageing reactor simulators present some tough decisions for utility managers. Although most utilities have chosen the cheaper, upgrading solution as the best compromise between costs and outage length, some US utilities have found that for them, replacement represents the best option. Simulators may be less than ten years old, but they have limited instructor systems, older low fidelity models that cannot reproduce important training scenarios, and out of date, difficult to maintain computers that do not permit much expansion of the models anyway. Perhaps worse than this is the possibility that the simulator may no longer be a faithful reproduction of the referenced plant, or have poor (or non-existent) documentation. (author)

  5. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  6. Cadmium plating replacements

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, M.J.; Groshart, E.C.

    1995-03-01

    The Boeing Company has been searching for replacements to cadmium plate. Two alloy plating systems seem close to meeting the needs of a cadmium replacement. The two alloys, zinc-nickel and tin-zinc are from alloy plating baths; both baths are neutral pH. The alloys meet the requirements for salt fog corrosion resistance, and both alloys excel as a paint base. Currently, tests are being performed on standard fasteners to compare zinc-nickel and tin-zinc on threaded hardware where cadmium is heavily used. The Hydrogen embrittlement propensity of the zinc-nickel bath has been tested, and just beginning for the tin-zinc bath. Another area of interest is the electrical properties on aluminum for tin-zinc and will be discussed. The zinc-nickel alloy plating bath is in production in Boeing Commercial Airplane Group for non-critical low strength steels. The outlook is promising that these two coatings will help The Boeing Company significantly reduce its dependence on cadmium plating.

  7. REPLACEMENT OF FRENCH CARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The French Ministry of Foreign Affairs has informed the Organization that it is shortly to replace all diplomatic cards, special cards and employment permits ('attestations de fonctions') now held by members of the personnel and their families. Between 2 July and 31 December 2001, these cards are to be replaced by secure, computerized equivalents. A 'personnel office' stamped photocopy of the old cards may continue to be used until 31 December 2001. For the purposes of the handover, members of the personnel must go personally to the cards office (33/1-015), between 8:30 and 12:30, in order to fill a 'fiche individuelle' form (in black ink only), which has to be personally signed by themselves and another separately signed by members of their family, taking the following documents for themselves and members of their families already in possession of a French card : A recent identity photograph in 4.5 cm x 3.5 cm format (signed on the back) The French card in their possession an A4 photocopy of the same Fre...

  8. Power Plant Replacement Study

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  9. Solid-State Thyratron Replacement. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Roth, Ian [Diversified Technologies, Inc., Bedford, MA

    2017-12-12

    Under this SBIR, DTI developed a solid-state switch as an alternative to legacy thyratron equipment. Our Phase II objective was to make a solid-state thyratron replacement that would provide equivalent or better performance, much higher reliability (at least a 20 year lifetime, compared to a thyratron’s two-year lifetime) and would sell for ~3x the cost of a thyratron, or less than $40k. We were successful in building a solid-state switch which could reliably function as a thyratron replacement. The unit was designed to directly replace the thyratrons currently being used at SLAC’s Linac Coherent Light Source (LCLS), and was built in a tank that was small enough to fit into the existing thyratron cabinet, providing a true form-fit-function replacement path. We tested the switch at the full operating specifications: 48 kV, 6.3 kA, and 1 µs risetime. We also demonstrated a peak-to-peak pulse jitter of 1.5 ns, which is five times shorter than is typical for thyratrons. This lower jitter would improve the performance of the LCLS beam. The predicted reliability is more than 80 years, which is 40 times greater than a thyratron.

  10. A Review of the Dutch Ecosystem for Building Integrated Photovoltaics

    NARCIS (Netherlands)

    Osseweijer, Floor J W; Van Den Hurk, Linda B P; Teunissen, Erik J H M; Van Sark, Wilfried G J H M

    2017-01-01

    Building integrated photovoltaics (BIPV) is one of the most promising solutions to generate renewable electricity in the built environment. BIPV applications can replace regular building components into prefab integrated components that at the same time generate electricity, contributing to the

  11. Replace with abstract title

    Science.gov (United States)

    Coho, Aleksander; Kioussis, Nicholas

    2003-03-01

    We use the semidiscrete variational generelized Peierls-Nabarro model to study the effect of Cu alloying on the dislocation properties of Al. First-principles density functional theory (DFT) is used to calculate the generalized-stacking-fault (GSF) energy surface when a plane, on which one in four Al atoms has been replaced with a Cu atom, slips over a pure Al plane. Various dislocation core properties (core width, energy, Peierls stress, dissociation tendency) are investigated and compared with the pure Al case. Cu alloying lowers the intrinsic stacking fault (ISF) energy, which makes dislocations more likely to dissociate into partials. We also try to understand the lowering of ISF energy in terms of Al-Cu and Al-Al bond formation and braking during shearing along the direction. From the above we draw conclusions about the effects of Cu alloying on the mechanical properties of Al.

  12. Iron replacement therapy

    DEFF Research Database (Denmark)

    Nielsen, Ole Haagen; Coskun, Mehmet; Weiss, Günter

    2016-01-01

    PURPOSE OF REVIEW: Approximately, one-third of the world's population suffers from anemia, and at least half of these cases are because of iron deficiency. With the introduction of new intravenous iron preparations over the last decade, uncertainty has arisen when these compounds should...... be administered and under which circumstances oral therapy is still an appropriate and effective treatment. RECENT FINDINGS: Numerous guidelines are available, but none go into detail about therapeutic start and end points or how iron-deficiency anemia should be best treated depending on the underlying cause...... of iron deficiency or in regard to concomitant underlying or additional diseases. SUMMARY: The study points to major issues to be considered in revisions of future guidelines for the true optimal iron replacement therapy, including how to assess the need for treatment, when to start and when to stop...

  13. Total ankle joint replacement.

    Science.gov (United States)

    2016-02-01

    Ankle arthritis results in a stiff and painful ankle and can be a major cause of disability. For people with end-stage ankle arthritis, arthrodesis (ankle fusion) is effective at reducing pain in the shorter term, but results in a fixed joint, and over time the loss of mobility places stress on other joints in the foot that may lead to arthritis, pain and dysfunction. Another option is to perform a total ankle joint replacement, with the aim of giving the patient a mobile and pain-free ankle. In this article we review the efficacy of this procedure, including how it compares to ankle arthrodesis, and consider the indications and complications. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  14. optimizing compressive strength characteristics of hollow building

    African Journals Online (AJOL)

    eobe

    Keywords: hollow building Blocks, granite dust, sand, partial replacement, compressive strength. 1. INTRODUCTION ... exposed to extreme climate. The physical ... Sridharan et al [13] conducted shear strength studies on soil-quarry dust.

  15. Building America

    Energy Technology Data Exchange (ETDEWEB)

    Brad Oberg

    2010-12-31

    IBACOS researched the constructability and viability issues of using high performance windows as one component of a larger approach to building houses that achieve the Building America 70% energy savings target.

  16. Building calculations

    DEFF Research Database (Denmark)

    Jensen, Bjarne Christian; Hansen, Svend Ole

    Textbook on design of large panel building including rules on robustness and a method for producing the Statical documentattion......Textbook on design of large panel building including rules on robustness and a method for producing the Statical documentattion...

  17. Solar building

    OpenAIRE

    Zhang, Luxin

    2014-01-01

    In my thesis I describe the utilization of solar energy and solar energy with building integration. In introduction it is also mentioned how the solar building works, trying to make more people understand and accept the solar building. The thesis introduces different types of solar heat collectors. I compared the difference two operation modes of solar water heating system and created examples of solar water system selection. I also introduced other solar building applications. It is conv...

  18. Building envelope

    CSIR Research Space (South Africa)

    Gibberd, Jeremy T

    2009-01-01

    Full Text Available for use in the building. This is done through photovoltaic and solar water heating panels and wind turbines. Ideally these are integrated in the design of the building envelope to improve the aesthetic quality of the building and minimise material... are naturally ventilated. Renewable energy The building envelope includes renewable energy generation such as photovoltaics, wind turbines and solar water heaters and 10% of the building’s energy requirements are generated from these sources. Views All...

  19. Auxiliary buildings

    International Nuclear Information System (INIS)

    Lakner, I.; Lestyan, E.

    1979-01-01

    The nuclear power station represents a complicated and a particular industrial project. Consequently, the design of the auxiliary buildings serving the power station (offices, kitchen, refreshment room, workshops, depots, water treatment plant building, boiler houses, etc.) requires more attention than usual. This chapter gives a short survey of the auxiliary buildings already completed and discusses the problems of their design, location and structure. (author)

  20. Building 2000

    International Nuclear Information System (INIS)

    Den Ouden, C.; Steemers, T.C.

    1992-01-01

    This is the first volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this first rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In a second volume, a similar series of studies is presented for the building categories: office buildings, public buildings and hotels and holiday complexes. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (15 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  1. Building 2000

    Energy Technology Data Exchange (ETDEWEB)

    Den Ouden, C [EGM Engineering BV, Dordrecht (Netherlands); Steemers, T C [Commission of the European Communities, Brussels (Belgium)

    1992-01-01

    This is the first volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this first rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In a second volume, a similar series of studies is presented for the building categories: office buildings, public buildings and hotels and holiday complexes. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (15 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues.

  2. Filter replacement lifetime prediction

    Science.gov (United States)

    Hamann, Hendrik F.; Klein, Levente I.; Manzer, Dennis G.; Marianno, Fernando J.

    2017-10-25

    Methods and systems for predicting a filter lifetime include building a filter effectiveness history based on contaminant sensor information associated with a filter; determining a rate of filter consumption with a processor based on the filter effectiveness history; and determining a remaining filter lifetime based on the determined rate of filter consumption. Methods and systems for increasing filter economy include measuring contaminants in an internal and an external environment; determining a cost of a corrosion rate increase if unfiltered external air intake is increased for cooling; determining a cost of increased air pressure to filter external air; and if the cost of filtering external air exceeds the cost of the corrosion rate increase, increasing an intake of unfiltered external air.

  3. Rosetta Structure Prediction as a Tool for Solving Difficult Molecular Replacement Problems.

    Science.gov (United States)

    DiMaio, Frank

    2017-01-01

    Molecular replacement (MR), a method for solving the crystallographic phase problem using phases derived from a model of the target structure, has proven extremely valuable, accounting for the vast majority of structures solved by X-ray crystallography. However, when the resolution of data is low, or the starting model is very dissimilar to the target protein, solving structures via molecular replacement may be very challenging. In recent years, protein structure prediction methodology has emerged as a powerful tool in model building and model refinement for difficult molecular replacement problems. This chapter describes some of the tools available in Rosetta for model building and model refinement specifically geared toward difficult molecular replacement cases.

  4. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  5. Antenna Controller Replacement Software

    Science.gov (United States)

    Chao, Roger Y.; Morgan, Scott C.; Strain, Martha M.; Rockwell, Stephen T.; Shimizu, Kenneth J.; Tehrani, Barzia J.; Kwok, Jaclyn H.; Tuazon-Wong, Michelle; Valtier, Henry; Nalbandi, Reza; hide

    2010-01-01

    The Antenna Controller Replacement (ACR) software accurately points and monitors the Deep Space Network (DSN) 70-m and 34-m high-efficiency (HEF) ground-based antennas that are used to track primarily spacecraft and, periodically, celestial targets. To track a spacecraft, or other targets, the antenna must be accurately pointed at the spacecraft, which can be very far away with very weak signals. ACR s conical scanning capability collects the signal in a circular pattern around the target, calculates the location of the strongest signal, and adjusts the antenna pointing to point directly at the spacecraft. A real-time, closed-loop servo control algorithm performed every 0.02 second allows accurate positioning of the antenna in order to track these distant spacecraft. Additionally, this advanced servo control algorithm provides better antenna pointing performance in windy conditions. The ACR software provides high-level commands that provide a very easy user interface for the DSN operator. The operator only needs to enter two commands to start the antenna and subreflector, and Master Equatorial tracking. The most accurate antenna pointing is accomplished by aligning the antenna to the Master Equatorial, which because of its small size and sheltered location, has the most stable pointing. The antenna has hundreds of digital and analog monitor points. The ACR software provides compact displays to summarize the status of the antenna, subreflector, and the Master Equatorial. The ACR software has two major functions. First, it performs all of the steps required to accurately point the antenna (and subreflector and Master Equatorial) at the spacecraft (or celestial target). This involves controlling the antenna/ subreflector/Master-Equatorial hardware, initiating and monitoring the correct sequence of operations, calculating the position of the spacecraft relative to the antenna, executing the real-time servo control algorithm to maintain the correct position, and

  6. Hip Replacement: MedlinePlus Health Topic

    Science.gov (United States)

    ... invasive hip replacement (Medical Encyclopedia) Also in Spanish Topic Image MedlinePlus Email Updates Get Hip Replacement updates ... replacement - precautions Minimally invasive hip replacement Related Health Topics Hip Injuries and Disorders National Institutes of Health ...

  7. Building 2000

    International Nuclear Information System (INIS)

    Den Ouden, C.; Steemers, T.C.

    1992-01-01

    This is the second volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this second rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In the first volume, a similar series of studies is presented for the building categories: schools, laboratories and universities, and sports and educational centres. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (11 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  8. Building 2000

    Energy Technology Data Exchange (ETDEWEB)

    Den Ouden, C [EGM Engineering BV, Dordrecht (Netherlands); Steemers, T C [Commission of the European Communities, Brussels (Belgium)

    1992-01-01

    This is the second volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this second rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In the first volume, a similar series of studies is presented for the building categories: schools, laboratories and universities, and sports and educational centres. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (11 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues.

  9. Educating My Replacement

    Science.gov (United States)

    Tarter, Jill

    , in partnership with the dedicated teachers out there, I think I can help promote the critical thinking skills and scientific literacy of the next generation of voters. Hopefully, I can also help train my replacement to be a better scientist, capable of seizing all the opportunities generated by advances in technology and our improved understanding of the universe to craft search strategies with greater probability of success than those I have initiated.

  10. Building integrated photovoltaic; Photovaltaique integre aux batiments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-01-01

    Durable, modular and flexible in use, as demonstrated by the different case studies in this publication, photovoltaic can replace diverse building elements, from glass facades to weather proof roofs. This leaflet towards architects describes aesthetic, technical, economic and environmental interest of building integrated photovoltaic. (author)

  11. Transforming Normal Programs by Replacement

    NARCIS (Netherlands)

    Bossi, Annalisa; Pettorossi, A.; Cocco, Nicoletta; Etalle, Sandro

    1992-01-01

    The replacement transformation operation, already defined in [28], is studied wrt normal programs. We give applicability conditions able to ensure the correctness of the operation wrt Fitting's and Kunen's semantics. We show how replacement can mimic other transformation operations such as thinning,

  12. Optimization of costs for the DOEL 3 steam generator replacement

    International Nuclear Information System (INIS)

    Leblois, C.

    1994-01-01

    Several aspects of steam generator replacement economics are discussed on the basis of the recent replacement carried out in the Doel 3 unit. The choice between repair of replacement policies, as well as the selection of the intervention date were based on a comparison of costs in which various possible scenarios were examined. The contractual approach for the different works to be performed was also an important point, as well as the project organization in which CAD played an important role. This organization allowed to optimize the outage duration and to realize numerous interventions in the reactor building in parallel with the replacement itself. A last aspect of the optimization of costs is the possibility to uprate the plant power. In the case of Doel 3, the plant restarted with a nominal power increased by 10%, of which 5,7% were possible by the increase of the SG heat transfer area. (Author) 6 refs

  13. Minimally invasive aortic valve replacement

    DEFF Research Database (Denmark)

    Foghsgaard, Signe; Schmidt, Thomas Andersen; Kjaergard, Henrik K

    2009-01-01

    In this descriptive prospective study, we evaluate the outcomes of surgery in 98 patients who were scheduled to undergo minimally invasive aortic valve replacement. These patients were compared with a group of 50 patients who underwent scheduled aortic valve replacement through a full sternotomy...... operations were completed as mini-sternotomies, 4 died later of noncardiac causes. The aortic cross-clamp and perfusion times were significantly different across all groups (P replacement...... is an excellent operation in selected patients, but its true advantages over conventional aortic valve replacement (other than a smaller scar) await evaluation by means of randomized clinical trial. The "extended mini-aortic valve replacement" operation, on the other hand, is a risky procedure that should...

  14. Laboratory Building

    Energy Technology Data Exchange (ETDEWEB)

    Herrera, Joshua M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-01

    This report is an analysis of the means of egress and life safety requirements for the laboratory building. The building is located at Sandia National Laboratories (SNL) in Albuquerque, NM. The report includes a prescriptive-based analysis as well as a performance-based analysis. Following the analysis are appendices which contain maps of the laboratory building used throughout the analysis. The top of all the maps is assumed to be north.

  15. Foundation helps refurbish buildings

    International Nuclear Information System (INIS)

    Camenzind, B.

    2006-01-01

    This article looks at the activities of the Swiss 'Climate-Cent' foundation, which is helping support the energetic refurbishment of building envelopes. The conditions which have to be fulfilled to receive grants are explained. Work supported includes the replacement of windows and the insulation of roofs and attics as well as outside walls. Details on the financial support provided and examples of projects supported are given. The source of the finance needed to provide such support - a voluntary levy on petrol - and further support provided in certain Swiss cantons is commented on

  16. Safety benefits from CANDU reactor replacement - a case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  17. Safety benefits from CANDU reactor replacement. A case study

    International Nuclear Information System (INIS)

    Mottram, R.; Millard, J.W.F.; Purdy, P.

    2011-01-01

    Both total core replacement and core retubing have been used in the CANDU industry. For future plant refurbishments, based on experience both in new construction and in recent refurbishments, the concept of total core replacement has been revisited. This builds on practices for replacement of other large plant equipment like boilers. The Bruce CANDU reactors, with their local shield tanks built around the Calandria and containment closely located around that Calandria Shield Tank Assembly (CSTA), are believed to be good candidates for core replacement. A structured process was used to design a replacement CSTA suitable for Bruce A use. The work started with a study of opportunities for safety enhancements in the core. This progressed into design studies and related design assist safety analysis on the reactor. A key element of the work involved consideration of how verified features from later CANDU designs, and from our new reactor design work, could be tailored to fit this replacement core. The replacement reactor core brings in structural improvements in both calandria and end shield, and safety improvements like the natural circulation enhancing moderator cooling layout and further optimized reactivity layouts to improve shutdown system performance. Bruce Power are currently studying the business implications of this and retube techniques as part of preparation for future refurbishments. The work explained in this paper is in the context of the safety related changes and the work to choose and quantify them. (author)

  18. Patients Unicondylar Knee Replacement vs. Total Knee Replacement

    OpenAIRE

    Hedra Eskander

    2017-01-01

    The aim of this review article is to analyse the clinical effectiveness of total knee replacement (TKR) compared to unicondylar knee replacement (UKR) on patients. In terms of survival rates, revision rates and postoperative complications. The keywords used were: knee arthroplasty. Nearly three thousand articles were found on 25 August 2016. Of those, only twenty-five were selected and reviewed because they were strictly focused on the topic of this article. Compared with those who have TKR, ...

  19. Building a capacity building manual

    CSIR Research Space (South Africa)

    Clinton, DD

    2010-02-01

    Full Text Available Organizations 2010 Building a capacity building manual Daniel D. Clinton, Jr., P.E., F.NSPE Chair, WFEO Capacity Building Committee Dr Andrew Cleland, FIPENZ, Chief Executive, IPENZ, NZ Eng David Botha, FSAICE, Executive Director, SAICE, SA Dawit... 2010 Tertiary level University curricula Coaches and mentors Facilities EXCeeD Remuneration of Academics Experiential training Outreach to Students Students chapters Young members forum World Federation of Engineering Organizations 2010 Post...

  20. Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress

    Science.gov (United States)

    2016-04-05

    Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress Ronald O’Rourke Specialist in Naval...Affairs April 5, 2016 Congressional Research Service 7-5700 www.crs.gov R41129 Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine...1,091.1 million in research and development funding for the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic

  1. Nuclear reactor fuel replacement system

    International Nuclear Information System (INIS)

    Kayano, Hiroyuki; Joge, Toshio.

    1976-01-01

    Object: To permit the direction in which a fuel replacement unit is moving to be monitored by the operator. Structure: When a fuel replacement unit approaches an intermediate goal position preset in the path of movement, renewal of data display on a goal position indicator is made every time the goal position is changed. With this renewal, the prevailing direction of movement of the fuel replacement unit can be monitored by the operator. When the control of movement is initiated, the co-ordinates of the intermediate goal point A are displayed on a goal position indicator. When the replacement unit reaches point A, the co-ordinates of the next intermediate point B are displayed, and upon reaching point B the co-ordinates of the (last) goal point C are displayed. (Nakamura, S.)

  2. Slab replacement maturity guidelines : [summary].

    Science.gov (United States)

    2014-04-01

    Concrete sets in hours at moderate temperatures, : but the bonds that make concrete strong continue : to mature over days to years. However, for : replacement concrete slabs on highways, it is : crucial that concrete develop enough strength : within ...

  3. Prolonged Intermittent Renal Replacement Therapy.

    Science.gov (United States)

    Edrees, Fahad; Li, Tingting; Vijayan, Anitha

    2016-05-01

    Prolonged intermittent renal replacement therapy (PIRRT) is becoming an increasingly popular alternative to continuous renal replacement therapy in critically ill patients with acute kidney injury. There are significant practice variations in the provision of PIRRT across institutions, with respect to prescription, technology, and delivery of therapy. Clinical trials have generally demonstrated that PIRRT is non-inferior to continuous renal replacement therapy regarding patient outcomes. PIRRT offers cost-effective renal replacement therapy along with other advantages such as early patient mobilization and decreased nursing time. However, due to lack of standardization of the procedure, PIRRT still poses significant challenges, especially pertaining to appropriate drug dosing. Future guidelines and clinical trials should work toward developing consensus definitions for PIRRT and ensure optimal delivery of therapy. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  4. Replacement of sub-systems

    International Nuclear Information System (INIS)

    Rosen, S.E.

    1992-01-01

    This paper describes a number of quality aspects related to replacement of important systems or components in a nuclear power station. Reference is given to the steam generator replacement and power uprating performed at Ringhals 2 in Sweden in 1989. Since quality is a wide concept there has been put special emphasis in this paper to the important aspects that traditionally are not connected to quality. (author) 1 fig

  5. Reactor building

    International Nuclear Information System (INIS)

    Ebata, Sakae.

    1990-01-01

    At least one valve rack is disposed in a reactor building, on which pipeways to a main closure valve, valves and bypasses of turbines are placed and contained. The valve rack is fixed to the main body of the building or to a base mat. Since the reactor building is designed as class A earthquake-proofness and for maintaining the S 1 function, the valve rack can be fixed to the building main body or to the base mat. With such a constitution, the portions for maintaining the S 1 function are concentrated to the reactor building. As a result, the dispersion of structures of earthquake-proof portion corresponding to the reference earthquake vibration S 1 can be prevented. Accordingly, the conditions for the earthquake-proof design of the turbine building and the turbine/electric generator supporting rack are defined as only the class B earthquake-proof design conditions. In view of the above, the amount of building materials can be saved and the time for construction can be shortened. (I.S.)

  6. Feeder replacement tooling and processes

    International Nuclear Information System (INIS)

    Mallozzi, R.; Goslin, R.; Pink, D.; Askari, A.

    2008-01-01

    Primary heat transport system feeder integrity has become a concern at some CANDU nuclear plants as a result of thinning caused by flow accelerated corrosion (FAC). Feeder inspections are indicating that life-limiting wall thinning can occur in the region between the Grayloc hub weld and second elbow of some outlet feeders. In some cases it has become necessary to replace thinned sections of affected feeders to restore feeder integrity to planned end of life. Atomic Energy of Canada Limited (AECL) and Babcock and Wilcox Canada Ltd. (B and W) have developed a new capability for replacement of single feeders at any location on the reactor face without impacting or interrupting operation of neighbouring feeders. This new capability consists of deploying trained crews with specialized tools and procedures for feeder replacements during planned outages. As may be expected, performing single feeder replacement in the congested working environment of an operational CANDU reactor face involves overcoming many challenges with respect to access to feeders, available clearances for tooling, and tooling operation and performance. This paper describes some of the challenges encountered during single feeder replacements and actions being taken by AECL and B and W to promote continuous improvement of feeder replacement tooling and processes and ensure well-executed outages. (author)

  7. Building sustainability

    CSIR Research Space (South Africa)

    Mass Media

    2007-11-01

    Full Text Available particu- lar social environment also being awarded. If a building can be used by the community after hours, it should be awarded extra points.” School sports facilities or meeting halls in corporate buildings, are some example. Multi-purpose use..., architect and senior researcher for the CSIR’s Built Environment Unit, the integra- tion of sustainability in building design cannot begin soon enough before it is too late. He says: “Unfortunately nothing is in place in South Africa. For a start...

  8. Building Acoustics

    Science.gov (United States)

    Cowan, James

    This chapter summarizes and explains key concepts of building acoustics. These issues include the behavior of sound waves in rooms, the most commonly used rating systems for sound and sound control in buildings, the most common noise sources found in buildings, practical noise control methods for these sources, and the specific topic of office acoustics. Common noise issues for multi-dwelling units can be derived from most of the sections of this chapter. Books can be and have been written on each of these topics, so the purpose of this chapter is to summarize this information and provide appropriate resources for further exploration of each topic.

  9. NIF Laser Line Replaceable Units (LRUs)

    International Nuclear Information System (INIS)

    Larson, D W

    2003-01-01

    The National Ignition Facility (NIF) is designed with its high value optical systems in cassettes called Line Replaceable Units (LRUs). Virtually all of the NIF's active components are assembled in one of the ∼4000 electrical and optical LRUs that serve between two and eight of NIF's 192 laser beam lines. Many of these LRUs are optomechanical assemblies that are roughly the size of a telephone booth. The primary design challenges for this hardware include meeting stringent mechanical precision, stability and cleanliness requirements. Pre-production units of each LRU type have been fielded on the first bundle of NIF and used to demonstrate that NIF meets its performance objectives. This presentation provides an overview of the NIF LRUs, their design and production plans for building out the remaining NIF bundles

  10. Using Bamboo as an Alternative Material for Environmental Friendly Building

    NARCIS (Netherlands)

    Mardjono, F.; Erkelens, P.A.; Jonge, S. de; Vliet, A.A.M. van

    2000-01-01

    Bamboo is one of natural resources that can be applied for building materials. In such bamboo growing countries, bamboo has main role as a building material for more than hundreds years ago. Sometimes bamboo can be used to replace wood based building material. Based on the detecting of problems on

  11. Building Data

    Data.gov (United States)

    Town of Cary, North Carolina — Explore real estate information about buildings in the Town of Cary.This file is created by the Town of Cary GIS Group. It contains data from both the Wake, Chatham...

  12. Preliminary study of possible ORELA replacement options

    International Nuclear Information System (INIS)

    Olsen, D.K.; Martin, J.A.; Horen, D.J.

    1984-06-01

    Based on two conceptual design studies performed by the LANL Accelerator Technology Division, the possibilities in terms of accelerator systems for replacing ORELA with a more intense Maxwellian-type continuous-energy neutron source are summarized and discussed. The neutron intensities from ORELA are compared with those from existing or potential accelerator systems used for cross-section and condensed-matter studies. The best replacement options seem to involve a spallation source from 200- to 400-MeV protons on an ORELA-like target. Pulsing and intensity desiderata with such a source are discussed which correspond to a spectrum-averaged 100-fold improved figure of merit over ORELA for TOF measurements with only a tenfold increased source strength. Existing accelerator designs seem to be inadequate for such a source. Consequently, two conceptual designs were developed for this study by the LANL Accelerator Technology Division. The first conceptual design is for a 200-MeV large linac capable of accelerating 1.3 A during a macropulse; this linac standing alone could serve as an ORELA replacement source. The second conceptual design is for a much smaller 250-MeV PIGMI linac with a 28-mA macropulse current which feeds a proton accumulator ring and bunch-compressor transport line. This linac-ring-compressor (LIRIC) option would give a more cost-effective neutron source for cross-section measurements, whereas the large linac, or a modified version of it, would give a much simpler system more suitable for expansion. In particular, both conceptual designs would incorporate the present ORELA building and would provide approximately 100-fold improved neutron sources over ORELA for cross-section measurements. The total estimated cost of the LIRIC system would be $43M (1984), whereas the cost of the large linac would be about a factor of two more. 55 references, 11 figures, 19 tables

  13. Prioritization methodology for chemical replacement

    Science.gov (United States)

    Cruit, Wendy; Goldberg, Ben; Schutzenhofer, Scott

    1995-01-01

    Since United States of America federal legislation has required ozone depleting chemicals (class 1 & 2) to be banned from production, The National Aeronautics and Space Administration (NASA) and industry have been required to find other chemicals and methods to replace these target chemicals. This project was initiated as a development of a prioritization methodology suitable for assessing and ranking existing processes for replacement 'urgency.' The methodology was produced in the form of a workbook (NASA Technical Paper 3421). The final workbook contains two tools, one for evaluation and one for prioritization. The two tools are interconnected in that they were developed from one central theme - chemical replacement due to imposed laws and regulations. This workbook provides matrices, detailed explanations of how to use them, and a detailed methodology for prioritization of replacement technology. The main objective is to provide a GUIDELINE to help direct the research for replacement technology. The approach for prioritization called for a system which would result in a numerical rating for the chemicals and processes being assessed. A Quality Function Deployment (QFD) technique was used in order to determine numerical values which would correspond to the concerns raised and their respective importance to the process. This workbook defines the approach and the application of the QFD matrix. This technique: (1) provides a standard database for technology that can be easily reviewed, and (2) provides a standard format for information when requesting resources for further research for chemical replacement technology. Originally, this workbook was to be used for Class 1 and Class 2 chemicals, but it was specifically designed to be flexible enough to be used for any chemical used in a process (if the chemical and/or process needs to be replaced). The methodology consists of comparison matrices (and the smaller comparison components) which allow replacement technology

  14. Optimization of station battery replacement

    International Nuclear Information System (INIS)

    Jancauskas, J.R.; Shook, D.A.

    1994-01-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability of quickly analyze proposed modifications and response to internal and external audits

  15. Replacement research reactor for Australia

    International Nuclear Information System (INIS)

    Miller, Ross

    1998-01-01

    In 1992, the Australian Government commissioned a review into the need for a replacement research reactor. That review concluded that in about years, if certain conditions were met, the Government could make a decision in favour of a replacement reactor. A major milestone was achieved when, on 3 September 1997, the Australian Government announced the construction of a replacement research reactor at the site of Australia's existing research reactor HIFAR, subject to the satisfactory outcome of an environmental assessment process. The reactor will be have the dual purpose of providing a first class facility for neutron beam research as well as providing irradiation facilities for both medical isotope production and commercial irradiations. The project is scheduled for completion before the end of 2005. (author)

  16. Joint replacement in Zambia: A review of Hip & Knee Replacement ...

    African Journals Online (AJOL)

    Methods: Data captured by the different variables entered into the Joint Register covering the pre-op, intra-op and post-op period of all total hip and knee replacement surgery done at the ZIOH from 1998 to 2010 was entered into a spreadsheet after verification with individual patient medical records. This was then imported ...

  17. HST Replacement Battery Initial Performance

    Science.gov (United States)

    Krol, Stan; Waldo, Greg; Hollandsworth, Roger

    2009-01-01

    The Hubble Space Telescope (HST) original Nickel-Hydrogen (NiH2) batteries were replaced during the Servicing Mission 4 (SM4) after 19 years and one month on orbit.The purpose of this presentation is to highlight the findings from the assessment of the initial sm4 replacement battery performance. The batteries are described, the 0 C capacity is reviewed, descriptions, charts and tables reviewing the State Of Charge (SOC) Performance, the Battery Voltage Performance, the battery impedance, the minimum voltage performance, the thermal performance, the battery current, and the battery system recharge ratio,

  18. Insurance for replacement power costs

    International Nuclear Information System (INIS)

    Cleaver, A.

    1980-01-01

    Although careful consideration is given to insurance against physical damage to plant and equipment, little thought is given to the costs that will be incurred in replacing the power that is lost while a relatively efficient system is out of action. The results of an investigation carried out for a generating authority with an installed capacity of about 3000 MW is given. Replacement power costs for different cases of severity of damage range from Pound1.17m per month for damage to central services taking out all four units. (author)

  19. Replacing fuel alignment in Germany

    International Nuclear Information System (INIS)

    Poetz, F.; Kalthoff, W.

    1991-01-01

    Up to the end of 1989 varying numbers of broken fuel alignment pins were detected in several German PWRs (80 broken pins in all). The distribution of these broken pins over the core cross-section was more or less random. The problem was due to the stress corrosion cracking of the pin material and was restricted to individual pins. It was concluded that all fuel alignment pins made of Inconel X-750 should be replaced. The development of a new pin, more resistant to intergranular stress corrosion, and the replacement technique are outlined. (author)

  20. Competence Building

    DEFF Research Database (Denmark)

    Borrás, Susana; Edquist, Charles

    The main question that guides this paper is how governments are focusing (and must focus) on competence building (education and training) when designing and implementing innovation policies. With this approach, the paper aims at filling the gap between the existing literature on competences...... on the one hand, and the real world of innovation policy-making on the other, typically not speaking to each other. With this purpose in mind, this paper discusses the role of competences and competence-building in the innovation process from a perspective of innovation systems; it examines how governments...... and public agencies in different countries and different times have actually approached the issue of building, maintaining and using competences in their innovation systems; it examines what are the critical and most important issues at stake from the point of view of innovation policy, looking particularly...

  1. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system......‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...

  2. Testing of Replacement Bag Material

    International Nuclear Information System (INIS)

    Laurinat, J.E.

    1998-01-01

    Recently, the FB-Line bagout material was changed to simplify the processing of sand, slag, and crucible.The results of the strength tests and the outgassing measurements and calculations demonstrate that the proposed replacement nylon bag materials (HRMP and orange anti-static material) are acceptable substitutes for LDPE and the original nylon with respect to mechanical properties

  3. Electrocatalysts Prepared by Galvanic Replacement

    Directory of Open Access Journals (Sweden)

    Athanasios Papaderakis

    2017-03-01

    Full Text Available Galvanic replacement is the spontaneous replacement of surface layers of a metal, M, by a more noble metal, Mnoble, when the former is treated with a solution containing the latter in ionic form, according to the general replacement reaction: nM + mMnoblen+ → nMm+ + mMnoble. The reaction is driven by the difference in the equilibrium potential of the two metal/metal ion redox couples and, to avoid parasitic cathodic processes such as oxygen reduction and (in some cases hydrogen evolution too, both oxygen levels and the pH must be optimized. The resulting bimetallic material can in principle have a Mnoble-rich shell and M-rich core (denoted as Mnoble(M leading to a possible decrease in noble metal loading and the modification of its properties by the underlying metal M. This paper reviews a number of bimetallic or ternary electrocatalytic materials prepared by galvanic replacement for fuel cell, electrolysis and electrosynthesis reactions. These include oxygen reduction, methanol, formic acid and ethanol oxidation, hydrogen evolution and oxidation, oxygen evolution, borohydride oxidation, and halide reduction. Methods for depositing the precursor metal M on the support material (electrodeposition, electroless deposition, photodeposition as well as the various options for the support are also reviewed.

  4. Testosterone replacement in male hypogonadism

    OpenAIRE

    Kalra, Sanjay; Agrawal, Navneet; Kumar, Satish; Sharma, Amit

    2010-01-01

    Sanjay Kalra1, Navneet Agrawal2, Satish Kumar3, Amit Sharma11Department of Endocrinology, Bharti Hospital, Karnal, India; 2Dept of Medicine, GR Medical College, Gwalior, India; 3Clinical Research, EXCEL Life Sciences, NOIDA, IndiaAbstract: This article contains a review of the clinical aspects of testosterone replacement in androgen deficiency of the aging male.Keywords: testosterone, supplementation, hypogonadism, ADAM

  5. Existing buildings

    DEFF Research Database (Denmark)

    Gram-Hanssen, Kirsten

    2014-01-01

    their homes. These policy measures include building regulations, energy tax and different types of incentives and information dissemination. The conclusion calls for new and innovative policy measures to cope with the realities of renovations of owner-occupied houses and how energy efficiency improvement...

  6. Building Sandcastles

    DEFF Research Database (Denmark)

    Jensen, Steffen Moltrup Ernø; Korsgaard, Steffen; Shumar, Wes

    of entrepreneurship education. Our theoretical and methodological approach builds on Actor-Network Theory. The empirical settings of our study consist of two entrepreneurship courses which differ in terms of temporal extension and physical setting. Data is collected using observation and interview techniques. Our...

  7. Sustainable Buildings

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Elle, Morten

    The scientific community agrees that: all countries must drastically and rapidly reduce their CO2 emissions and that energy efficient houses play a decisive role in this. The general attitude at the workshop on Sustainable Buildings was that we face large and serious climate change problems...

  8. 25 CFR 700.53 - Dwelling, replacement.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Dwelling, replacement. 700.53 Section 700.53 Indians THE... Policies and Instructions Definitions § 700.53 Dwelling, replacement. The term replacement dwelling means a dwelling selected by the head of a household as a replacement dwelling that meets the criteria of this...

  9. 24 CFR 880.602 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 880.602... Replacement reserve. (a) A replacement reserve must be established and maintained in an interest-bearing account to aid in funding extraordinary maintenance and repair and replacement of capital items. (1) Part...

  10. 24 CFR 891.405 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.405....405 Replacement reserve. (a) Establishment of reserve. The Owner shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance and repair and replacement of capital items...

  11. 24 CFR 891.855 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserves. 891.855... § 891.855 Replacement reserves. (a) The mixed-finance owner shall establish and maintain a replacement... the funds will be used to pay for capital replacement costs for the Section 202 or 811 supportive...

  12. A Bayesian perspective on some replacement strategies

    International Nuclear Information System (INIS)

    Mazzuchi, Thomas A.; Soyer, Refik

    1996-01-01

    In this paper we present a Bayesian decision theoretic approach for determining optimal replacement strategies. This approach enables us to formally incorporate, express, and update our uncertainty when determining optimal replacement strategies. We develop relevant expressions for both the block replacement protocol with minimal repair and the age replacement protocol and illustrate the use of our approach with real data

  13. Capacity Building

    International Nuclear Information System (INIS)

    Molloy, Brian; Mallick, Shahid

    2014-01-01

    Outcomes & Recommendations: • Significant increase needed in the nuclear workforce both to replace soon-to-retire current generation and to staff large numbers of new units planned • Key message, was the importance of an integrated approach to workforce development. • IAEA and other International Organisations were asked to continue to work on Knowledge Management, Networks and E&T activities • IAEA requested to conduct Global Survey of HR needs – survey initiated but only 50% of operating countries (30% of capacity) took part, so results inconclusive

  14. Better Buildings Neighborhood Program: BetterBuildings Lowell Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Heslin, Thomas

    2014-01-31

    The City of Lowell set four goals at the beginning of the Better Buildings Neighborhood Program: 1. Improve the Downtown Historic Park District’s Carbon Footprint 2. Develop a sustainable and replicable model for energy efficiency in historic buildings 3. Create and retain jobs 4. Promote multi-stakeholder partnerships The City of Lowell, MA was awarded $5 million in May 2010 to conduct energy efficiency retrofits within the downtown National Historical Park (NHP). The City’s target was to complete retrofits in 200,000 square feet of commercial space and create 280 jobs, while adhering to the strict historical preservation regulations that govern the NHP. The development of a model for energy efficiency in historic buildings was successfully accomplished. BetterBuildings Lowell’s success in energy efficiency in historic buildings was due to the simplicity of the program. We relied strongly on the replacement of antiquated HVAC systems and air sealing and a handful of talented energy auditors and contractors. BetterBuildings Lowell was unique for the Better Buildings Neighborhood Program because it was the only program that focused solely on commercial properties. BetterBuildings Lowell did target multi-family properties, which were reported as commercial, but the majority of the building types and uses were commercial. Property types targeted were restaurants, office buildings, museums, sections of larger buildings, mixed use buildings, and multifamily buildings. This unique fabric of building type and use allows for a deeper understanding to how different properties use energy. Because of the National Historical Park designation of downtown Lowell, being able to implement energy efficiency projects within a highly regulated historical district also provided valuable research and precedent proving energy efficiency projects can be successfully completed in historical districts and historical buildings. Our program was very successful in working with the local

  15. Modifications to Replacement Costs System

    International Nuclear Information System (INIS)

    Godec, M.

    1989-01-01

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985

  16. Building Bridges

    DEFF Research Database (Denmark)

    The report Building Bridges adresses the questions why, how and for whom academic audience research has public value, from the different points of view of the four working groups in the COST Action IS0906 Transforming Audiences, Transforming Societies – “New Media Genres, Media Literacy and Trust...... in the Media”, “Audience Interactivity and Participation”, “The Role of Media and ICT Use for Evolving Social Relationships” and “Audience Transformations and Social Integration”. Building Bridges is the result of an ongoing dialogue between the Action and non-academic stakeholders in the field of audience......, Brian O’Neill, Andra Siibak, Sascha Trültzsch-Wijnen, Nicoletta Vittadini, Igor Vobič and Frauke Zeller. Stakeholder feedback from: Michelle Arlotta (DeAgostini), Andreea M. Costache (Association of Consumers of Audiovisual Media in Catalonia/TAC), Francesco Diasio (AMARC Europe), Marius Dragomir (Open...

  17. Building economics

    DEFF Research Database (Denmark)

    Pedersen, D.O.(red.)

    Publikationen er på engelsk. Den omfatter alle indlæg på det fjerde internationale symposium om byggeøkonomi, der blev arrangeret af SBI for det internationale byggeforskningsråd CIB. De fem bind omhandler: Methods of Economic Evaluation, Design Optimization, Ressource Utilization, The Building...... Market og Economics and Technological Forecasting in Construction. Et indledende bind bringer statusrapporter for de fem forskningsområder, og det sidste bind sammenfatter debatten på symposiet....

  18. Results of Austin Moore replacement.

    Directory of Open Access Journals (Sweden)

    Jadhav A

    1996-04-01

    Full Text Available Forty cases of Austin Moore Replacement done for transcervical fractures of the femur in patients were reviewed after a period of 12 to 48 months postoperatively (mean 26 mth. 30 cases (75% had mild to severe pain of non-infective origin, starting as early as 6 months postoperatively. This was irrespective of the make, size or position (varus/valgus of the prosthesis. Though the Aufranc and Sweet clinical scoring was satisfactory in 65% cases, radiological evidence of complications like sinking, protrusion, etc. were seen in majority of the cases. Calcar resorption was seen in 34 cases (85% as early as 4 months postoperatively. Results of THR and bipolar replacement done for transcervical fractures in recent literature show 85% pain-free cases at 5 years. We feel that Austin Moore Replacement should be reserved for patients more than 65 years of age and those who are less active or debilitated because of other factors, because of increased acetabular wear with time in the younger individual. This is corroborated by unsatisfactory results in patients less than 65 years of age (p < 0.05.

  19. The caudal septum replacement graft.

    Science.gov (United States)

    Foda, Hossam M T

    2008-01-01

    To describe a technique for reconstructing the lost tip support in cases involving caudal septal and premaxillary deficiencies. The study included 120 patients with aesthetic and functional nasal problems resulting from the loss of caudal septal and premaxillary support. An external rhinoplasty approach was performed to reconstruct the lost support using a cartilaginous caudal septum replacement graft and premaxillary augmentation with Mersilene mesh. The majority of cases (75%) involved revisions in patients who had previously undergone 1 or more nasal surgical procedures. A caudal septum replacement graft was combined with premaxillary augmentation in 93 patients (77.5%). The mean follow-up period was 3 years (range, 1-12 years). The technique succeeded in correcting the external nasal deformities in all patients and resulted in a significant improvement in breathing in 74 patients (86%) with preoperative nasal obstruction. There were no cases of infection, displacement, or extrusion. The caudal septum replacement graft proved to be very effective in restoring the lost tip support in patients with caudal septal deficiency. Combining the graft with premaxillary augmentation using Mersilene mesh helped increase support and stability over long-term follow-up.

  20. BWR control blade replacement strategies

    Energy Technology Data Exchange (ETDEWEB)

    Kennard, M W [Stoller Nuclear Fuel, NAC International, Pleasantville, NY (United States); Harbottle, J E [Stoller Nuclear Fuel, NAC International, Thornbury, Bristol (United Kingdom)

    2000-02-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B{sub 4}C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  1. BWR control blade replacement strategies

    International Nuclear Information System (INIS)

    Kennard, M.W.; Harbottle, J.E.

    2000-01-01

    The reactivity control elements in a BWR, the control blades, perform three significant functions: provide shutdown margin during normal and accident operating conditions; provide overall core reactivity control; and provide axial power shaping control. As such, the blades are exposed to the core's neutron flux, resulting in irradiation of blade structural and absorber materials. Since the absorber depletes with time (if B 4 C is used, it also swells) and the structural components undergo various degradation mechanisms (e.g., embrittlement, corrosion), the blades have limits on their operational lifetimes. Consequently, BWR utilities have implemented strategies that aim to maximize blade lifetimes while balancing operational costs, such as extending a refuelling outage to shuffle high exposure blades. This paper examines the blade replacement strategies used by BWR utilities operating in US, Europe and Asia by assembling information related to: the utility's specific blade replacement strategy; the impact the newer blade designs and changes in core operating mode were having on those strategies; the mechanical and nuclear limits that determined those strategies; the methods employed to ensure that lifetime limits were not exceeded during operation; and blade designs used (current and replacement blades). (author)

  2. Media and Australia's replacement reactor project

    International Nuclear Information System (INIS)

    Keenan, Pamela

    2001-01-01

    In September 1997, the Commonwealth Government of Australia announced a proposal to build a replacement nuclear research reactor at Lucas Heights in Sydney. Extensive public consultation, parliamentary debate and independent reports were prepared to ensure that the new facility would meet strict international requirements, national safety and environmental standards, and performance specifications servicing the needs of Australia - for decades to come. On 6 June 2000, Argentine company INVAP SE was announced as the preferred tenderer. In July 2000 contracts were signed between INVAP and the Australian Nuclear Science and Technology Organisation for the construction the replacement reactor, due to be completed in 2005. In order to retain a strong local presence, INVAP undertook a joint venture with two of Australia's foremost heavy construction businesses. Briefly the new research reactor will be a replacement for the ageing Australian Reactor (HIFAR). Nuclear science and technology, in Australia, is no stranger to media controversy and misinformation. Understandably the announcement of a preferred tenderer followed by the signing of contracts, attracted significant national and international media attention. However in the minds of the media, the issue is far from resolved and is now a constant 'news story' in the Australian media. Baseless media stories have made claims that the project will cost double the original estimates; question the credibility of the contractors; and raise issues of international security. The project is currently linked with Australia's requirements for long term nuclear waste management and there has been an attempt to bring national Indigenous People's issues into play. Some of these issues have been profiled in the press internationally. So, just to set the record straight and give you an appropriate impression of what's 'really happening' I would like to highlight a few issues, how ANSTO dealt with these, and what was finally reported

  3. ARP/wARP and molecular replacement: the next generation

    International Nuclear Information System (INIS)

    Cohen, Serge X.; Ben Jelloul, Marouane; Long, Fei; Vagin, Alexei; Knipscheer, Puck; Lebbink, Joyce; Sixma, Titia K.; Lamzin, Victor S.; Murshudov, Garib N.; Perrakis, Anastassis

    2008-01-01

    A systematic test shows how ARP/wARP deals with automated model building for structures that have been solved by molecular replacement. A description of protocols in the flex-wARP control system and studies of two specific cases are also presented. Automatic iterative model (re-)building, as implemented in ARP/wARP and its new control system flex-wARP, is particularly well suited to follow structure solution by molecular replacement. More than 100 molecular-replacement solutions automatically solved by the BALBES software were submitted to three standard protocols in flex-wARP and the results were compared with final models from the PDB. Standard metrics were gathered in a systematic way and enabled the drawing of statistical conclusions on the advantages of each protocol. Based on this analysis, an empirical estimator was proposed that predicts how good the final model produced by flex-wARP is likely to be based on the experimental data and the quality of the molecular-replacement solution. To introduce the differences between the three flex-wARP protocols (keeping the complete search model, converting it to atomic coordinates but ignoring atom identities or using the electron-density map calculated from the molecular-replacement solution), two examples are also discussed in detail, focusing on the evolution of the models during iterative rebuilding. This highlights the diversity of paths that the flex-wARP control system can employ to reach a nearly complete and accurate model while actually starting from the same initial information

  4. ImBuild: Impact of building energy efficiency programs

    Energy Technology Data Exchange (ETDEWEB)

    Scott, M.J.; Hostick, D.J.; Belzer, D.B.

    1998-04-01

    As part of measuring the impact of government programs on improving the energy efficiency of the Nation`s building stock, the Department of Energy Office of Building Technology, State and Community Programs (BTS) is interested in assessing the economic impacts of its portfolio of programs, specifically the potential impact on national employment and income. The special-purpose version of the IMPLAN model used in this study is called ImBuild. In comparison with simple economic multiplier approaches, such as Department of Commerce RIMS 2 system, ImBuild allows for more complete and automated analysis of the economic impacts of energy efficiency investments in buildings. ImBuild is also easier to use than existing macroeconomic simulation models. The authors conducted an analysis of three sample BTS energy programs: the residential generator-absorber heat exchange gas heat pump (GAX heat pump), the low power sulfur lamp (LPSL) in residential and commercial applications, and the Building America program. The GAX heat pump would address the market for the high-efficiency residential combined heating and cooling systems. The LPSL would replace some highly efficient fluorescent commercial lighting. Building America seeks to improve the energy efficiency of new factory-built, modular, manufactured, and small-volume, site-built homes through use of systems engineering concepts and early incorporation of new products and processes, and by increasing the demand for more energy-efficient homes. The authors analyze a scenario for market penetration of each of these technologies devised for BTS programs reported in the BTS GPRA Metrics Estimates, FY99 Budget Request, December 19, 1997. 46 figs., 4 tabs.

  5. Sustainable building versus ecological building

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2010-04-01

    Full Text Available and sensitivity to a site that are required to efficiently meet the energy needs of a building and occupants with renewable energy (solar, wind, geothermal, etc), designers must apply holistic design principles and take advantage of the free, naturally... monumental waste: the product which they deliver requires resources such as energy and water to operate over its entire life-cycle, a period measured in decades, and often in centuries. Throughout this process, construction activities often result...

  6. Model building

    International Nuclear Information System (INIS)

    Frampton, Paul H.

    1998-01-01

    In this talk I begin with some general discussion of model building in particle theory, emphasizing the need for motivation and testability. Three illustrative examples are then described. The first is the Left-Right model which provides an explanation for the chirality of quarks and leptons. The second is the 331-model which offers a first step to understanding the three generations of quarks and leptons. Third and last is the SU(15) model which can accommodate the light leptoquarks possibly seen at HERA

  7. Model building

    International Nuclear Information System (INIS)

    Frampton, P.H.

    1998-01-01

    In this talk I begin with some general discussion of model building in particle theory, emphasizing the need for motivation and testability. Three illustrative examples are then described. The first is the Left-Right model which provides an explanation for the chirality of quarks and leptons. The second is the 331-model which offers a first step to understanding the three generations of quarks and leptons. Third and last is the SU(15) model which can accommodate the light leptoquarks possibly seen at HERA. copyright 1998 American Institute of Physics

  8. Gentilly 2 divider plate replacement

    International Nuclear Information System (INIS)

    Forest, J.; Klisel, E.; McClellan, G.; Schnelder, W.

    1995-01-01

    The steam generators at the Gentilly 2 Nuclear Plant in operation since 1983 were built with primary divider plates of a bolted panel configuration. During a routine outage inspection, it was noted that two bolts had dislodged from the divider and were located lying in the primary head. Subsequent inspections revealed erosion damage to a substantial number of divider plate bolts and to a lesser extent, to the divider plate itself. After further inspection and repair the units were returned to operation, however, it was determined that a permanent replacement of the primary divider plates was going to be necessary. After evaluation of various options, it was decided that the panel type dividers would be replaced with a single piece floating design. The divider itself was to be of a one piece all-welded arrangement to be constructed from individual panels to be brought in through the manways. In view of the strength limitations of the bolted attachment of the upper seat bar to the tubesheet, a new welded seat bar was provided. To counteract erosion concerns, the new divider is fitted with erosion resistant inserts or weld buildup and with improved sealing features in order to minimize leakage and erosion. At an advanced stage in the design and manufacture of the components, the issue of divider strength during LOCA conditions came into focus. Analysis was performed to determine the strength and/or failure characteristics of the divider to a variety of small and large LOCA conditions. The paper describes the diagnosis of the original divider plates and the design, manufacture, field mobilization, installation and subsequent operation of the replacement divider plates. (author)

  9. In Defense of Artificial Replacement.

    Science.gov (United States)

    Shiller, Derek

    2017-06-01

    If it is within our power to provide a significantly better world for future generations at a comparatively small cost to ourselves, we have a strong moral reason to do so. One way of providing a significantly better world may involve replacing our species with something better. It is plausible that in the not-too-distant future, we will be able to create artificially intelligent creatures with whatever physical and psychological traits we choose. Granted this assumption, it is argued that we should engineer our extinction so that our planet's resources can be devoted to making artificial creatures with better lives. © 2017 John Wiley & Sons Ltd.

  10. Hormone Replacement Therapy and Your Heart

    Science.gov (United States)

    Hormone replacement therapy and your heart Are you taking — or considering — hormone therapy to treat bothersome menopausal symptoms? Understand ... you. By Mayo Clinic Staff Long-term hormone replacement therapy used to be routinely prescribed for postmenopausal ...

  11. Skilled nursing facilities after joint replacement

    Science.gov (United States)

    ... care providers in the weeks before your joint replacement. They can advise you about whether going directly ... of many people who have had a joint replacement? Can they tell you how many? A good ...

  12. Risks of hip and knee replacement

    Science.gov (United States)

    ... is normal to lose blood during and after hip or knee replacement surgery. Some people need a ... clot form are higher during and soon after hip or knee replacement surgery. Sitting or lying down ...

  13. Fleet replacement modeling : final report, July 2009.

    Science.gov (United States)

    2009-07-01

    This project focused on two interrelated areas in equipment replacement modeling for fleets. The first area was research-oriented and addressed a fundamental assumption in engineering economic replacement modeling that all assets providing a similar ...

  14. Long-life slab replacement concrete : [summary].

    Science.gov (United States)

    2015-04-01

    Concrete slab replacement projects in Florida have demonstrated a high incidence of : replacement slab cracking. Causes of cracking have not been reliably determined. University of South Florida researchers : sought to identify the factors or : param...

  15. Long-life slab replacement concrete.

    Science.gov (United States)

    2015-03-01

    This research was initiated following reports of high incidence of cracking on FDOT concrete pavement replacement : slab projects. Field slabs were instrumented for data acquisition from high-early-strength concrete pavement : replacement slabs place...

  16. B Plant process piping replacement feasibility study

    International Nuclear Information System (INIS)

    Howden, G.F.

    1996-01-01

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace

  17. Permanent Quadriplegia Following Replacement of Voice Prosthesis.

    Science.gov (United States)

    Ozturk, Kayhan; Erdur, Omer; Kibar, Ertugrul

    2016-11-01

    The authors presented a patient with quadriplegia caused by cervical spine abscess following voice prosthesis replacement. The authors present the first reported permanent quadriplegia patient caused by voice prosthesis replacement. The authors wanted to emphasize that life-threatening complications may be faced during the replacement of voice prosthesis. Care should be taken during the replacement of voice prosthesis and if some problems have been faced during the procedure patients must be followed closely.

  18. 24 CFR 970.31 - Replacement units.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement units. 970.31 Section... PUBLIC HOUSING PROGRAM-DEMOLITION OR DISPOSITION OF PUBLIC HOUSING PROJECTS § 970.31 Replacement units. Notwithstanding any other provision of law, replacement public housing units may be built on the original public...

  19. Diagenetic replacement of Micas by Carbonates

    NARCIS (Netherlands)

    Oele, E.

    1961-01-01

    In the Ordovician sandstones of the Cantabrian Mountains a replacement of the micas by carbonate minerals could be observed. The absence of metamorphic minerals suggests a diagenetic replacement. This is supported by the finding of the same type of replacement in some undisturbed Pliocene sediments

  20. 47 CFR 13.17 - Replacement license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Replacement license. 13.17 Section 13.17 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMERCIAL RADIO OPERATORS General § 13.17 Replacement... request a replacement. The application must be accompanied by the required fee and submitted to the...

  1. 24 CFR 891.605 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.605... 8 Assistance § 891.605 Replacement reserve. (a) Establishment of reserve. The Borrower shall establish and maintain a replacement reserve to aid in funding extraordinary maintenance, and repair and...

  2. 24 CFR 891.745 - Replacement reserve.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Replacement reserve. 891.745... and Individuals-Section 162 Assistance § 891.745 Replacement reserve. The general requirements for the replacement reserve are provided in § 891.605. For projects funded under §§ 891.655 through 891.790, the...

  3. 24 CFR 572.125 - Replacement reserves.

    Science.gov (United States)

    2010-04-01

    ...) Homeownership Program Requirements-Implementation Grants § 572.125 Replacement reserves. (a) Purpose. A single replacement reserve may be established for the homeownership program only if HUD determines it is necessary to... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Replacement reserves. 572.125...

  4. Molecular replacement then and now

    International Nuclear Information System (INIS)

    Scapin, Giovanna

    2013-01-01

    A brief overview, with examples, of the evolution of molecular-replacement methods and models over the past few years is presented. The ‘phase problem’ in crystallography results from the inability to directly measure the phases of individual diffracted X-ray waves. While intensities are directly measured during data collection, phases must be obtained by other means. Several phasing methods are available (MIR, SAR, MAD, SAD and MR) and they all rely on the premise that phase information can be obtained if the positions of marker atoms in the unknown crystal structure are known. This paper is dedicated to the most popular phasing method, molecular replacement (MR), and represents a personal overview of the development, use and requirements of the methodology. The first description of noncrystallographic symmetry as a tool for structure determination was explained by Rossmann and Blow [Rossmann & Blow (1962 ▶), Acta Cryst.15, 24–31]. The term ‘molecular replacement’ was introduced as the name of a book in which the early papers were collected and briefly reviewed [Rossmann (1972 ▶), The Molecular Replacement Method. New York: Gordon & Breach]. Several programs have evolved from the original concept to allow faster and more sophisticated searches, including six-dimensional searches and brute-force approaches. While careful selection of the resolution range for the search and the quality of the data will greatly influence the outcome, the correct choice of the search model is probably still the main criterion to guarantee success in solving a structure using MR. Two of the main parameters used to define the ‘best’ search model are sequence identity (25% or more) and structural similarity. Another parameter that may often be undervalued is the quality of the probe: there is clearly a relationship between the quality and the correctness of the chosen probe and its usefulness as a search model. Efforts should be made by all structural biologists to

  5. Controversies in hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    A. Baziad

    2001-09-01

    Full Text Available Deficiency of estrogen hormone will result in either long-term or short-term health problems which may reduce the quality of life. There are numerous methods by which the quality of female life can be achieved. Since the problems occuring are due to the deficiency of estrogen hormone, the appropriate method to tackle the problem is by administration of estrogen hormone. The administration of hormone replacement therapy (HRT with estrogen may eliminate climacteric complaints, prevent osteoporosis, coronary heart disease, dementia, and colon cancer. Although HRT has a great deal of advantage, its use is still low and may result in controversies. These controversies are due to fact that both doctor and patient still hold on to the old, outmoded views which are not supported by numerous studies. Currently, the use of HRT is not only based on experience, or temporary observation, but more on evidence based medicine. (Med J Indones 2001; 10: 182-6Keywords: controversies, HRT

  6. Tracheal replacement by autogenous aorta

    Directory of Open Access Journals (Sweden)

    Anoosh Farhad

    2009-06-01

    Full Text Available Abstract Background Tracheal defects may occur after trauma or prolonged intubation. Resection of tracheal tumors also poses a major challenge for substitution. In an effort to solve this problem, different techniques have been tried with little success. We report on a new animal model which showed acceptable results with fewer complications. Methods We replaced 5 cm of cervical trachea in 10 dogs with harvested infra-renal aorta and repaired the aortic defect with Dacron graft. Results Necropsy of the grafted aorta and anastomotic site revealed well healed anastomosis in all animals together with ciliated columnar epithelium coverage of grafted aorta and neovascularization of aortic wall. Conclusion Aortic graft is preferable to other substitutes because of less antigenicity, less vascularity, and no mucous secretions or peristalsis

  7. Tracheal replacement by autogenous aorta.

    Science.gov (United States)

    Anoosh, Farhad; Hodjati, Hossain; Dehghani, Seifollah; Tanideh, Nader; Kumar, Perikala V

    2009-06-09

    Tracheal defects may occur after trauma or prolonged intubation. Resection of tracheal tumors also poses a major challenge for substitution. In an effort to solve this problem, different techniques have been tried with little success. We report on a new animal model which showed acceptable results with fewer complications. We replaced 5 cm of cervical trachea in 10 dogs with harvested infra-renal aorta and repaired the aortic defect with Dacron graft. Necropsy of the grafted aorta and anastomotic site revealed well healed anastomosis in all animals together with ciliated columnar epithelium coverage of grafted aorta and neovascularization of aortic wall. Aortic graft is preferable to other substitutes because of less antigenicity, less vascularity, and no mucous secretions or peristalsis.

  8. Renal replacement therapy in Europe

    DEFF Research Database (Denmark)

    Pippias, Maria; Stel, Vianda S; Abad Diez, José Maria

    2015-01-01

    BACKGROUND: This article summarizes the 2012 European Renal Association-European Dialysis and Transplant Association Registry Annual Report (available at www.era-edta-reg.org) with a specific focus on older patients (defined as ≥65 years). METHODS: Data provided by 45 national or regional renal...... disease (ESRD) receiving renal replacement therapy (RRT) and renal transplantation rates for 2012 are presented. RESULTS: In 2012, the overall unadjusted incidence rate of patients with ESRD receiving RRT was 109.6 per million population (pmp) (n = 69 035), ranging from 219.9 pmp in Portugal to 24.2 pmp...... to 32% between countries. The overall renal transplantation rate in 2012 was 28.3 pmp (n = 15 673), with the highest rate seen in the Spanish region of Catalonia. The proportion of patients ≥65 years receiving a transplant ranged from 0 to 35%. Five-year adjusted survival for all RRT patients was 59...

  9. Computer simulation of replacement sequences in copper

    International Nuclear Information System (INIS)

    Schiffgens, J.O.; Schwartz, D.W.; Ariyasu, R.G.; Cascadden, S.E.

    1978-01-01

    Results of computer simulations of , , and replacement sequences in copper are presented, including displacement thresholds, focusing energies, energy losses per replacement, and replacement sequence lengths. These parameters are tabulated for six interatomic potentials and shown to vary in a systematic way with potential stiffness and range. Comparisons of results from calculations made with ADDES, a quasi-dynamical code, and COMENT, a dynamical code, show excellent agreement, demonstrating that the former can be calibrated and used satisfactorily in the analysis of low energy displacement cascades. Upper limits on , , and replacement sequences were found to be approximately 10, approximately 30, and approximately 14 replacements, respectively. (author)

  10. Cost justification of chiller replacement

    International Nuclear Information System (INIS)

    Baker, T.J.; Baumer, R.A.

    1993-01-01

    We often hear of products with paybacks that are too good to be true. Just a few weeks ago,a client received a recommendation from a national service company's local office. In the letter the company recommended that open-quotes due to the age and condition of the boiler ... that the school consider replacing the boiler... The cost for the new boiler can usually be recovered by lower fuel bills in 2 to 3 yearsclose quotes. This was for an installation in Southeast Texas where the boiler is only used 4 to 5 months per year. Analysis show the above claims to be nonsense. A new boiler would cost about $47,000 installed. Current total gas bills for the facility are $15,630 per year. They would have to shutoff the gas to the facility to have a three year payback. In fact, only two-thirds of the gas is used to heat the facility so we have only $10, 000 to write off against the new boiler. How much will the greater efficiency save? A 30% savings due to greater efficiency produces $3,000 per year in gas savings to offset the $47,000 cost, a 16 year payback. And much of the efficiency savings can be realized by adjusting the existing boiler. In another care a client wanted to investigate replacement of a twenty year old chiller plant with more efficient equipment. We investigated the project and determined that the payback would be greater than ten years. They did not operate the equipment during the summer and at less than 50% of capacity the balance of the year

  11. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  12. Reactor building

    International Nuclear Information System (INIS)

    Maruyama, Toru; Murata, Ritsuko.

    1996-01-01

    In the present invention, a spent fuel storage pool of a BWR type reactor is formed at an upper portion and enlarged in the size to effectively utilize the space of the building. Namely, a reactor chamber enhouses reactor facilities including a reactor pressure vessel and a reactor container, and further, a spent fuel storage pool is formed thereabove. A second spent fuel storage pool is formed above the auxiliary reactor chamber at the periphery of the reactor chamber. The spent fuel storage pool and the second spent fuel storage pool are disposed in adjacent with each other. A wall between both of them is formed vertically movable. With such a constitution, the storage amount for spent fuels is increased thereby enabling to store the entire spent fuels generated during operation period of the plant. Further, since requirement of the storage for the spent fuels is increased stepwisely during periodical exchange operation, it can be used for other usage during the period when the enlarged portion is not used. (I.S.)

  13. Building America

    Energy Technology Data Exchange (ETDEWEB)

    Brad Oberg

    2010-12-31

    Builders generally use a 'spec and purchase' business management system (BMS) when implementing energy efficiency. A BMS is the overall operational and organizational systems and strategies that a builder uses to set up and run its company. This type of BMS treats building performance as a simple technology swap (e.g. a tank water heater to a tankless water heater) and typically compartmentalizes energy efficiency within one or two groups in the organization (e.g. purchasing and construction). While certain tools, such as details, checklists, and scopes of work, can assist builders in managing the quality of the construction of higher performance homes, they do nothing to address the underlying operational strategies and issues related to change management that builders face when they make high performance homes a core part of their mission. To achieve the systems integration necessary for attaining 40% + levels of energy efficiency, while capturing the cost tradeoffs, builders must use a 'systems approach' BMS, rather than a 'spec and purchase' BMS. The following attributes are inherent in a systems approach BMS; they are also generally seen in quality management systems (QMS), such as the National Housing Quality Certification program: Cultural and corporate alignment, Clear intent for quality and performance, Increased collaboration across internal and external teams, Better communication practices and systems, Disciplined approach to quality control, Measurement and verification of performance, Continuous feedback and improvement, and Whole house integrated design and specification.

  14. Honeywell starts energy-management service: savings guaranteed; BOSS replaced

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, R.

    1983-01-24

    Honeywell Inc. guarantees that its new Honeywell Service Link Operation (HSLO), a time-sharing service, will produce greater energy savings than its monthly fees. There are no front-end costs because the central computer is located at the supplier's Atlanta site, making energy management cost-affordable for facilities as small as 25,000 square feet. HSLO replaces Honeywell's Building Operations Service System (BOSS) that has a minimum-size requirement of 100,000 square feet. BOSS customers will be automatically changed to HSLO at no charge. All 21 regional computer centers will be available to users. Johnson Controls, Inc. also operates a time-sharing operation called Total Automated Building Services (TABS). (DCK)

  15. Building energy analysis tool

    Science.gov (United States)

    Brackney, Larry; Parker, Andrew; Long, Nicholas; Metzger, Ian; Dean, Jesse; Lisell, Lars

    2016-04-12

    A building energy analysis system includes a building component library configured to store a plurality of building components, a modeling tool configured to access the building component library and create a building model of a building under analysis using building spatial data and using selected building components of the plurality of building components stored in the building component library, a building analysis engine configured to operate the building model and generate a baseline energy model of the building under analysis and further configured to apply one or more energy conservation measures to the baseline energy model in order to generate one or more corresponding optimized energy models, and a recommendation tool configured to assess the one or more optimized energy models against the baseline energy model and generate recommendations for substitute building components or modifications.

  16. Australia's replacement research reactor project

    International Nuclear Information System (INIS)

    Harris, K.J.

    1999-01-01

    HIFAR, a 10 MW tank type DIDO Class reactor has operated at the Lucas Heights Science and Technology Centre for 43 years. HIFAR and the 10 kW Argonaut reactor 'Moata' which is in the Care and Maintenance phase of decommissioning are Australia's only nuclear reactors. The initial purpose for HIFAR was for materials testing to support a nuclear power program. Changing community attitude through the 1970's and a Government decision not to proceed with a planned nuclear power reactor resulted in a reduction of materials testing activities and a greater emphasis being placed on neutron beam research and the production of radioisotopes, particularly for medical purposes. HIFAR is not fully capable of satisfying the expected increase in demand for medical radiopharmaceuticals beyond the next 5 years and the radial configuration of the beam tubes severely restricts the scope and efficiency of neutron beam research. In 1997 the Australian Government decided that a replacement research reactor should be built by the Australian Nuclear Science and Technology Organisation at Lucas Heights subject to favourable results of an Environmental Impact Study. The Ei identified no reasons on the grounds of safety, health, hazard or risk to prevent construction on the preferred site and it was decided in May 1999 that there were no environmental reasons why construction of the facility should not proceed. In recent years ANSTO has been reviewing the operation of HIFAR and observing international developments in reactor technology. Limitations in the flexibility and efficiency achievable in operation of a tank type reactor and the higher intrinsic safety sought in fundamental design resulted in an early decision that the replacement reactor must be a pool type having cleaner and higher intensity tangential neutron beams of wider energy range than those available from HIFAR. ANSTO has chosen to use it's own resources supported by specialised external knowledge and experience to identify

  17. Building trust

    International Nuclear Information System (INIS)

    Lewis, Meriel

    1995-01-01

    'Activate' is the energy magazine for secondary schools and is part of the Education Programme which is managed on behalf of the British Nuclear Industry Forum by AEA Technology. activate is the flagship communication device between the British Nuclear Industry Forum's Education Programme and secondary schools in the UK. It was developed from a previous publication, Nuclear Bulletin. There is a need for the nuclear industry to build trust with teachers and students in the UK, where for a long time, everything that the industry has said, written or printed has been disregarded by school teachers as propaganda. Over the last few years the industry has put in a great deal of effort to position itself as a provider of educationally sound and socially acceptable information. 'Activate' was an evolution of this idea and there was a hole in the market for a lively, activity and article based magazine that could be used in the classroom. The target audience is principally teachers of science, mathematics and geography, but also includes teachers of art,, English and history with students of between 11 and 18. The results were very positive in that teachers appreciated the colourful and lively nature of activate and they felt that it provided information and opinions in an un biased and non-propagandist way. Their comments about layout, number of activities style of presentation were taken into account and during the summer of 1994 activate was remodelled ready for re launch in September. The feedback so far is good with more teachers signing up every week to receive their own free copy

  18. Visual Image Sensor Organ Replacement

    Science.gov (United States)

    Maluf, David A.

    2014-01-01

    This innovation is a system that augments human vision through a technique called "Sensing Super-position" using a Visual Instrument Sensory Organ Replacement (VISOR) device. The VISOR device translates visual and other sensors (i.e., thermal) into sounds to enable very difficult sensing tasks. Three-dimensional spatial brightness and multi-spectral maps of a sensed image are processed using real-time image processing techniques (e.g. histogram normalization) and transformed into a two-dimensional map of an audio signal as a function of frequency and time. Because the human hearing system is capable of learning to process and interpret extremely complicated and rapidly changing auditory patterns, the translation of images into sounds reduces the risk of accidentally filtering out important clues. The VISOR device was developed to augment the current state-of-the-art head-mounted (helmet) display systems. It provides the ability to sense beyond the human visible light range, to increase human sensing resolution, to use wider angle visual perception, and to improve the ability to sense distances. It also allows compensation for movement by the human or changes in the scene being viewed.

  19. Gene replacement in Penicillium roqueforti.

    Science.gov (United States)

    Goarin, Anne; Silar, Philippe; Malagnac, Fabienne

    2015-05-01

    Most cheese-making filamentous fungi lack suitable molecular tools to improve their biotechnology potential. Penicillium roqueforti, a species of high industrial importance, would benefit from functional data yielded by molecular genetic approaches. This work provides the first example of gene replacement by homologous recombination in P. roqueforti, demonstrating that knockout experiments can be performed in this fungus. To do so, we improved the existing transformation method to integrate transgenes into P. roqueforti genome. In the meantime, we cloned the PrNiaD gene, which encodes a NADPH-dependent nitrate reductase that reduces nitrate to nitrite. Then, we performed a deletion of the PrNiaD gene from P. roqueforti strain AGO. The ΔPrNiaD mutant strain is more resistant to chlorate-containing medium than the wild-type strain, but did not grow on nitrate-containing medium. Because genomic data are now available, we believe that generating selective deletions of candidate genes will be a key step to open the way for a comprehensive exploration of gene function in P. roqueforti.

  20. Building integrated photovoltaics

    NARCIS (Netherlands)

    Ritzen, M.J.; Vroon, Z.A.E.P.; Geurts, C.P.W.; Reinders, Angèle; Verlinden, Pierre; Sark, Wilfried; Freundlich, Alexandre

    2017-01-01

    Photovoltaic (PV) installations can be realized in different situations and on different scales, such as at a building level. PV installations at the building level can either be added to the building envelope, which is called building added PV (BAPV), or they can be integrated into the building

  1. Replacement or reuse? The choice between demolition and life cycle extension from a sustainable viewpoint

    NARCIS (Netherlands)

    Thomsen, A.F.; van der Flier, C.L.

    2008-01-01

    What is better: renovation or new construction? Following the plenary debate on the ENHR 2007 conference in Rotterdam we continued our search for the answer to this question. The choice between reuse and replacement of existing buildings is a vital but very difficult one, involving a wide range of

  2. 25 CFR 256.19 - Who performs the improvements, repairs, or replacement of my dwelling?

    Science.gov (United States)

    2010-04-01

    ... my dwelling? 256.19 Section 256.19 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR... dwelling? Independent or tribal repair or construction trades persons, home building contractors, or construction companies will perform the repairs, renovation, or replacement of your dwelling. [63 FR 10134, Mar...

  3. Opportunistic replacement of fusion power system parts

    International Nuclear Information System (INIS)

    Day, J.A.; George, L.L.

    1981-01-01

    This paper describes a maintenance problem in a fusion power plant. The problem is to specify which life limited parts should be replaced when there is an opportunity. The objective is to minimize the cost rate of replacement parts and of maintenance actions while satisfying a power plant availability constraint. The maintenance policy is to look ahead and replace all parts that will reach their life limits within a time called a screen. Longer screens yield greater system availabilities because more parts are replaced prior to their life limits

  4. Aortic valve replacement in octogenarians

    Directory of Open Access Journals (Sweden)

    Dark John H

    2007-07-01

    Full Text Available Abstract Background and Aims As our population ages and life expectancy increases the number of people aged over 80 and more referred for cardiac surgery is growing. This study sought to identify the outcome of aortic valve replacement (AVR in octogenarians. Methods 68 patients aged 80 years or more underwent AVR at the Freeman Hospital, between April 2001 and April 2004. A retrospective review of the notes and outcomes from the patients' GP and the NHS strategic tracking service was performed. 54% (37 underwent isolated AVR whilst 46% (31 underwent combined AVR and CABG. Results Follow up was 100% complete. The mean age was 83.1 ± s.d. 2.9 years, a mean gradient of 83 ± s.d. 31 mmHg and mean AVA of 0.56 cm2. The mean additive EuroSCORE was 8.6 ± s.d. 1.2, the logistic EuroSCORE mean 12.0 ± s.d. 5.9. In hospital 30 day mortality was 13 %. Survival was 80% at 1 year and 78% at 2 years. Median follow up was for 712 days. Stepwise logistic regression identified chronic obstructive airways disease as an independent predictor of mortality (p Conclusion Our study demonstrates that the operative mortality for AVR in the over eighties is good, whilst the mid to long term outcome is excellent There is a very low attrition rate with those undergoing the procedure living as long than their age matched population. This study confirms AVR is a safe, acceptable treatment for octogenarians with excellent mid term outcomes.

  5. Menopause and hormone replacement therapy

    Directory of Open Access Journals (Sweden)

    Ali Baziad

    2001-12-01

    Full Text Available The global population in the 21st century has reached 6.2 billion people, by the year 2025 it is to be around 8.3-8.5 billion, and will increase further. Elderly people are expected to grow rapidly than other groups. The fastest increase in the elderly population will take place in Asia. Life expectancy is increasing steadily throughout developed and developing countries. For many  menopausal women, increased life expectancy will accompanied by many health problems. The consequences of estrogen deficiency are the menopausal symptoms. The treatment of menopause related complaints and diseases became an  important socioeconomic and medical issue. Long term symptoms, such as the increase in osteoporosis fractures, cardio and cerebrovascular disesses and dementia, created a large financial burden on individuals and society. All these health problems can be lreated or prevented by hormone replacement therapy (HRT. Natural HRT is usually prefened. Synthetic  estrogen in oral contraceptives (oc are not recommended for HRT. Many contra-indications for oc, but now it is widely usedfor HRT. The main reasons for discontinuing HRT are unwanted bleeding, fear of cancer, and negative side effects. Until now there are sill debates about the rebrtonship between HRT and the incidence of breast cancer. Many data showed that there were no clear relationship between the use of HRT and breast cancer. ThereÎore, nwny experts advocate the use of HRTfrom the first sign of climacteric complaints until death. (Med J Indones 2001;10: 242-51Keywords: estrogen deficiency, climacteric phases, tibolone.

  6. Replacing Fortran Namelists with JSON

    Science.gov (United States)

    Robinson, T. E., Jr.

    2017-12-01

    Maintaining a log of input parameters for a climate model is very important to understanding potential causes for answer changes during the development stages. Additionally, since modern Fortran is now interoperable with C, a more modern approach to software infrastructure to include code written in C is necessary. Merging these two separate facets of climate modeling requires a quality control for monitoring changes to input parameters and model defaults that can work with both Fortran and C. JSON will soon replace namelists as the preferred key/value pair input in the GFDL model. By adding a JSON parser written in C into the model, the input can be used by all functions and subroutines in the model, errors can be handled by the model instead of by the internal namelist parser, and the values can be output into a single file that is easily parsable by readily available tools. Input JSON files can handle all of the functionality of a namelist while being portable between C and Fortran. Fortran wrappers using unlimited polymorphism are crucial to allow for simple and compact code which avoids the need for many subroutines contained in an interface. Errors can be handled with more detail by providing information about location of syntax errors or typos. The output JSON provides a ground truth for values that the model actually uses by providing not only the values loaded through the input JSON, but also any default values that were not included. This kind of quality control on model input is crucial for maintaining reproducibility and understanding any answer changes resulting from changes in the input.

  7. Office Building, Roskilde, Denmark. Parkvænget 25, 4000 Roskilde

    DEFF Research Database (Denmark)

    Rose, Jørgen; Thomsen, Kirsten Engelund

    Built in 1968 the office building was a typical precast concrete building with a very limited level of insulation. In 1991 the building envelope was renovated and insulation was added to the wall (175 mm) and windows were replaced with traditional double-glazed windows. The main objective...

  8. Building performance simulation for sustainable buildings

    NARCIS (Netherlands)

    Hensen, J.L.M.

    2010-01-01

    This paper aims to provide a general view of the background and current state of building performance simulation, which has the potential to deliver, directly or indirectly, substantial benefits to building stakeholders and to the environment. However the building simulation community faces many

  9. Tribal Green Building Toolkit

    Science.gov (United States)

    This Tribal Green Building Toolkit (Toolkit) is designed to help tribal officials, community members, planners, developers, and architects develop and adopt building codes to support green building practices. Anyone can use this toolkit!

  10. BUILDING 341 Seismic Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Halle, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-15

    The Seismic Evaluation of Building 341 located at Lawrence Livermore National Laboratory in Livermore, California has been completed. The subject building consists of a main building, Increment 1, and two smaller additions; Increments 2 and 3.

  11. Danish building typologies and building stock analyses

    DEFF Research Database (Denmark)

    Wittchen, Kim Bjarne; Kragh, Jesper

    energy savings in residential buildings. The intension with this analysis was to investigate the possible energy reduction in Denmark if the same approach had been taken for the entire Danish building stock. The report concludes that the ZeroHome initiative clearly results in energy savings, but far from...... enough to meet the government’s plan to make Danish buildings free from use of fossil fuels by 2035. This will probably require around 50 % energy savings in the Danish building stock as a whole. However, the project has proven that dedicated engagement of locals can speed up market penetration...... for energy savings in the existing Building stock....

  12. Danish building typologies

    DEFF Research Database (Denmark)

    Wittchen, Kim Bjarne; Kragh, Jesper

    The objective of TABULA is to develop a harmonised building typology for European countries. Each national building typology will consist of a set of residential model buildings with characteristic energy-related properties (element areas of the thermal building envelope, U-values, supply system...... efficiencies). The model buildings will each represent a specific construction period of the country in question and a specific building size. Furthermore the number of buildings, flats and the overall floor areas will be given, which are represented by the different building types of the national typologies....

  13. 30 CFR 57.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 57.19122 Section 57.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 57.19122 Replacement parts. Parts used to repair hoists shall have properties...

  14. Transcatheter Aortic Valve Replacement in Europe

    DEFF Research Database (Denmark)

    Mylotte, Darren; Osnabrugge, Ruben L J; Windecker, Stephan

    2013-01-01

    The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy.......The authors sought to examine the adoption of transcatheter aortic valve replacement (TAVR) in Western Europe and investigate factors that may influence the heterogeneous use of this therapy....

  15. 30 CFR 56.19122 - Replacement parts.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Replacement parts. 56.19122 Section 56.19122 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Inspection and Maintenance § 56.19122 Replacement parts. Parts used to repair hoists shall have properties...

  16. An abstract machine for module replacement

    OpenAIRE

    Walton, Chris; Krl, Dilsun; Gilmore, Stephen

    1998-01-01

    In this paper we define an abstract machine model for the mλ typed intermediate language. This abstract machine is used to give a formal description of the operation of run-time module replacement from the programming language Dynamic ML. The essential technical device which we employ for module replacement is a modification of two-space copying garbage collection.

  17. Temelin NPP - IandC replacement

    International Nuclear Information System (INIS)

    Spalenka, I.

    1997-01-01

    The original instrumentation and control system of the Temelin nuclear power plant is being upgraded and replaced by a modern Westinghouse-supplied system which meets the requirements imposed on current nuclear power plant designs. The history and purpose of the IandC system replacement is given, and the design of the new system is described in some detail. (A.K.)

  18. Replacement Value of fermented millet ( Pennisetum americanum ...

    African Journals Online (AJOL)

    The replacement value of fermented millet for maize in the diets of Clarias gariepinus fingerlings reared in a recirculation system was determined. Five isonitrogenous diets were formulated to contain graded levels of fermented millet meal replacing 0, 20, 40, 60 and 80% of maize and fed to triplicate groups of fingerlings ...

  19. 30 CFR 823.14 - Soil replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Soil replacement. 823.14 Section 823.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-OPERATIONS ON PRIME FARMLAND § 823.14 Soil replacement. (a) Soil...

  20. A useful framework for optimal replacement models

    International Nuclear Information System (INIS)

    Aven, Terje; Dekker, Rommert

    1997-01-01

    In this note we present a general framework for optimization of replacement times. It covers a number of models, including various age and block replacement models, and allows a uniform analysis for all these models. A relation to the marginal cost concept is described

  1. 7 CFR 1944.659 - Replacement housing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Replacement housing. 1944.659 Section 1944.659 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) HOUSING Housing Preservation Grants § 1944.659 Replacement housing...

  2. A Study to Compare the Cost of Operation and Maintenance in Green Building Index (GBI and Non-Green Building Index (Non-GBI Rated Building in Malaysia

    Directory of Open Access Journals (Sweden)

    Ping Lee Zheng

    2016-01-01

    Full Text Available Urges for sustainable development had pushed the government and professional bodies to respond and react by implementing regulations where possible to direct development in that manner. However, the outcome in most financial conferences and dialogues on sustainable buildings flagged on high construction and maintenance cost. Thus, this study is conducted to collect and analyze actual building operation and maintenance cost between GBI and Non-GBI rated buildings in Malaysia which are more than 2 years fully operated buildings. There are two categories of selected buildings which are residential and non-residential type of building. Each category of the building consists of similar building’s characteristic such as geographic location, mode of operation, building heights, total numbers of floors and units. The scope of building’s maintenance for this study is mainly on wear and tear of the wall painting, electrical light fittings, ceiling panels, roofing system and mechanical services like water pump system are recorded for their replacement frequency of service and the cost involved within a consistent period of 12 months operation at cost percentage saving of 78.9% and 40.4% for residential and non-residential buildings respectively compare against Non-GBI rated buildings. Electricity consumption for GBI rated buildings are lower than Non-GBI rated buildings which recorded at the cost variance of 23.8% and 6.3% and water consumption at 35.9% and 44.0% for the above mentioned two main categories of selected case study buildings. Results from this study conclude major savings on residential buildings category in term of maintenance cost and electricity consumption for GBI rated buildings. Whereby, non-residential category of buildings, GBI rated building had been proven to obtain significant savings in terms of maintenance cost and water consumption.

  3. Replacing lactose from calf milk replacers : effects on digestion and post-absorptive metabolism

    NARCIS (Netherlands)

    Gilbert, M.S.

    2015-01-01

    Summary PhD thesis Myrthe S. Gilbert

    Replacing lactose from calf milk replacers – Effects on digestion and post-absorptive metabolism

    Veal calves are fed milk replacer (MR) and solid feed. The largest part of the energy provided to veal calves

  4. Pipe replacement in a water supply network: coordinated versus uncoordinated replacement and budget effects

    NARCIS (Netherlands)

    Dijk, van D.; Hendrix, E.M.T.

    2016-01-01

    Operators of underground water supply networks are challenged with pipe replacement
    decisions, because pipes are subject to increased failure rates as they age and financial resources
    are often limited.We study the optimal replacement time and optimal number of pipe replacements
    such

  5. Building Philippine SMEs Resilience to Natural Disasters

    OpenAIRE

    Ballesteros, Marife M.; Domingo, Sonny N.

    2015-01-01

    Disasters are bad for business specifically for small and medium enterprises (SMEs). These catastrophic events can compromise capital, logistics, product market, and labor, which compromise business continuity and recovery. Physical damage and disruptions in supply and labor can cause temporary business closure while structural repairs to buildings and recovery or replacement of damaged equipment needed to restore operations require large amount of resources. The adverse impact may not only b...

  6. Building a parabolic solar concentrator prototype

    International Nuclear Information System (INIS)

    Escobar-Romero, J F M; Montiel, S Vazquez y; Granados-AgustIn, F; Rodriguez-Rivera, E; Martinez-Yanez, L; Cruz-Martinez, V M

    2011-01-01

    In order to not further degrade the environment, people have been seeking to replace non-renewable natural resources such as fossil fuels by developing technologies that are based on renewable resources. An example of these technologies is solar energy. In this paper, we show the building and test of a solar parabolic concentrator as a prototype for the production of steam that can be coupled to a turbine to generate electricity or a steam engine in any particular industrial process.

  7. Design verification for reactor head replacement

    International Nuclear Information System (INIS)

    Dwivedy, K.K.; Whitt, M.S.; Lee, R.

    2005-01-01

    This paper outlines the challenges of design verification for reactor head replacement for PWR plants and the program for qualification from the prospective of the utility design engineering group. This paper is based on the experience with the design confirmation of four reactor head replacements for two plants, and their interfacing components, parts, appurtenances, and support structures. The reactor head replacement falls under the jurisdiction of the applicable edition of the ASME Section XI code, with particular reference to repair/replacement activities. Under any repair/replacement activities, demands may be encountered in the development of program and plan for replacement due to the vintage of the original design/construction Code and the design reports governing the component qualifications. Because of the obvious importance of the reactor vessel, these challenges take on an added significance. Additional complexities are introduced to the project, when the replacement components are fabricated by vendors different from the original vendor. Specific attention is needed with respect to compatibility with the original design and construction of the part and interfacing components. The program for reactor head replacement requires evaluation of welding procedures, applicable examination, test, and acceptance criteria for material, welds, and the components. Also, the design needs to take into consideration the life of the replacement components with respect to the extended period of operation of the plant after license renewal and other plant improvements. Thus, the verification of acceptability of reactor head replacement provides challenges for development and maintenance of a program and plan, design specification, design report, manufacturer's data report and material certification, and a report of reconciliation. The technical need may also be compounded by other challenges such as widely scattered global activities and organizational barriers, which

  8. Building Integrated Photovoltaic (BIPV) Roofs for Sustainability and Energy Efficiency

    Science.gov (United States)

    2013-09-10

    288 Enviromental 1 - Main Membrane 90000 9043 SqFt 472 Ft 94 98 None Real Estate Perimeter: 460Ft Rating: Excellent Rating: Excellent...Cost Index: $2.00 Section: Section Area: 288- Building 288 Enviromental 1 9043 Roof Replacement Cost: Insulation Replacement Cost: $8.00 per...Bldg NoJSec: 2881 Bldg Name: Bui ding 288 Enviromental Bldg Use: Ofice Inspection Date: Oct/2011 Membrane: SINGLE-PlY: PVC Area (SF): 9043

  9. Delirium After Transcatheter Aortic Valve Replacement.

    Science.gov (United States)

    Giuseffi, Jennifer L; Borges, Nyal E; Boehm, Leanne M; Wang, Li; McPherson, John A; Fredi, Joseph L; Ahmad, Rashid M; Ely, E Wesley; Pandharipande, Pratik P

    2017-07-01

    Postoperative delirium is associated with increased mortality. Patients undergoing transcatheter aortic valve replacement are at risk for delirium because of comorbid conditions. To compare the incidence, odds, and mortality implications of delirium between patients undergoing transcatheter replacement and patients undergoing surgical replacement. The Richmond Agitation-Sedation Scale and the Confusion Assessment Method for the Intensive Care Unit were used to assess arousal level and delirium prospectively in all patients with severe aortic stenosis who had transcatheter or surgical aortic valve replacement at an academic medical center. Multivariable logistic regression was used to determine the relationship between procedure type and occurrence of delirium. Cox regression was used to assess the association between postoperative delirium and 6-month mortality. A total of 105 patients had transcatheter replacement and 121 had surgical replacement. Patients in the transcatheter group were older (median age, 81 vs 68 years; P replacement. Delirium is less likely to develop in the transcatheter group but is associated with higher mortality in both groups. ©2017 American Association of Critical-Care Nurses.

  10. Optimal composition of fluid-replacement beverages.

    Science.gov (United States)

    Baker, Lindsay B; Jeukendrup, Asker E

    2014-04-01

    The objective of this article is to provide a review of the fundamental aspects of body fluid balance and the physiological consequences of water imbalances, as well as discuss considerations for the optimal composition of a fluid replacement beverage across a broad range of applications. Early pioneering research involving fluid replacement in persons suffering from diarrheal disease and in military, occupational, and athlete populations incurring exercise- and/or heat-induced sweat losses has provided much of the insight regarding basic principles on beverage palatability, voluntary fluid intake, fluid absorption, and fluid retention. We review this work and also discuss more recent advances in the understanding of fluid replacement as it applies to various populations (military, athletes, occupational, men, women, children, and older adults) and situations (pathophysiological factors, spaceflight, bed rest, long plane flights, heat stress, altitude/cold exposure, and recreational exercise). We discuss how beverage carbohydrate and electrolytes impact fluid replacement. We also discuss nutrients and compounds that are often included in fluid-replacement beverages to augment physiological functions unrelated to hydration, such as the provision of energy. The optimal composition of a fluid-replacement beverage depends upon the source of the fluid loss, whether from sweat, urine, respiration, or diarrhea/vomiting. It is also apparent that the optimal fluid-replacement beverage is one that is customized according to specific physiological needs, environmental conditions, desired benefits, and individual characteristics and taste preferences.

  11. Optimum body size of Holstein replacement heifers.

    Science.gov (United States)

    Hoffman, P C

    1997-03-01

    Criteria that define optimum body size of replacement heifers are required by commercial dairy producers to evaluate replacement heifer management programs. Historically recommended body size criteria have been based on live BW measurements. Numerous research studies have observed a positive relationship between BW at first calving and first lactation milk yield, which has served as the impetus for using live BW to define body size of replacement heifers. Live BW is, however, not the only available measurement to define body size. Skeletal measurements such as wither height, length, and pelvic area have been demonstrated to be related to first lactation performance and (or) dystocia. Live BW measurements also do not define differences in body composition. Differences in body composition of replacement heifers at first calving are also related to key performance variables. An updated research data base is available for the modern Holstein genotype to incorporate measures of skeletal growth and body composition with BW when defining body size. These research projects also lend insight into the relative importance of measurements that define body size of replacement heifers. Incorporation of these measurements from current research into present BW recommendations should aid commercial dairy producers to better define replacement heifer growth and management practices. This article proposes enhancements in defining optimum body size and growth characteristics of Holstein replacement heifers.

  12. Modern frame structure buildings

    Directory of Open Access Journals (Sweden)

    В. М. Першаков

    2013-07-01

    Full Text Available The article deals with the design, construction and implementation of reinforced concrete frame structures with span 18, 21 m for agricultural production buildings, hall-premises of public buildings and buildings of agricultural aviation. Structures are prefabricated frame buildings and have such advantages as large space inside the structure and lower cost compared with other facilities with same purpose

  13. Retrofitting Listed Buildings

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2011-01-01

    The paper presents a case study where the energy demand for a listed building constructed in 1900 is reduced. Many older buildings are listed and have restrictions that include the entire building or that include only its exterior. For the building presented, only its exterior facade is listed. T...

  14. Measurement in Sustainable Building

    DEFF Research Database (Denmark)

    Hale, Lara

    2018-01-01

    Measurement is a necessary aspect of planning and constructing buildings. However, recent attempts to integrate the social dimension of sustainable building into building design and specifications demand measurement of non-technical qualities, such as well-being. The Active House Alliance, in lieu...... and continued provision of sustainable buildings to market demand....

  15. ICT Enhanced Buildings Potentials

    DEFF Research Database (Denmark)

    Christiansson, Per

    2007-01-01

    component systems that are accessed and integrated in the real world of building use in different contexts. The ICT systems may be physically or virtually embedded in the building. Already in 1982 AT&T established the 'intelligent buildings', IB, concept due to marketing reasons and the Informart building...... with focus on virtual building models support, new services and user environment definitions and development, virtual spaces and augmented reality, intelligent building components, application ontologies, and ICT systems integration to illustrate ICT enhanced buildings potentials and R&D needs.  ...

  16. Global building physics

    DEFF Research Database (Denmark)

    Rode, Carsten

    2013-01-01

    High ambitions are set for the building physics performance of buildings today. No single technology can achieve fulfilment of these ambitions alone. Integrated, multi-facetted solutions and optimization are necessary. A holistic, or ‘global’, technological perspective is needed, which includes all...... aspects of the building as defined in building engineering. We live in an international society and building solutions are developed across country borders. Building physics is a global theme. The International Association of Building Physics has global appeal. This brief article reports the keynote...

  17. Global Building Physics

    DEFF Research Database (Denmark)

    Rode, Carsten

    2012-01-01

    High ambitions are set for the building physics performance of buildings today. No single technology can achieve fulfilment of these ambitions alone. Integrated, multi-facetted solutions and optimization are necessary. A holistic, or “global”, technological perspective is needed, which includes all...... aspects of the building as defined in building engineering. We live in an international society and building solutions are developed across country borders. Building physics is a global theme. The International Association of Building Physics has global appeal. The keynote lecture and this brief paper...

  18. The neutron beam facility at the Australian replacement research reactor

    International Nuclear Information System (INIS)

    Hunter, B.; Kennedy, S.

    1999-01-01

    Full text: The Australian federal government gave ANSTO final approval to build a research reactor to replace HIFAR on August 25th 1999. The replacement reactor is to be a multipurpose reactor with a thermal neutron flux of 3 x 10 14 n.cm -2 .s -1 and having improved capabilities for neutron beam research and for the production of radioisotopes for pharmaceutical, scientific and industrial use. The replacement reactor will commence operation in 2005 and will cater for Australian scientific, industrial and medical needs well into the 21st century. The scientific capabilities of the neutron beams at the replacement reactor are being developed in consultation with representatives from academia, industry and government research laboratories to provide a facility for condensed matter research in physics, chemistry, materials science, life sciences, engineering and earth sciences. Cold, thermal and hot neutron sources are to be installed, and neutron guides will be used to position most of the neutron beam instruments in a neutron guide hall outside the reactor confinement building. Eight instruments are planned for 2005, with a further three to be developed by 2010. A conceptual layout for the neutron beam facility is presented including the location of the planned suite of neutron beam instruments. The reactor and all the associated infrastructure, with the exception of the neutron beam instruments, is to be built by an accredited reactor builder in a turnkey contract. Tenders have been called for December 1999, with selection of contractor planned by June 2000. The neutron beam instruments will be developed by ANSTO and other contracted organisations in consultation with the user community and interested overseas scientists. The facility will be based, as far as possible, around a neutron guide hall that is be served by three thermal and three cold neutron guides. Efficient transportation of thermal and cold neutrons to the guide hall requires the use of modern super

  19. How to replace a reactor pressure vessel

    International Nuclear Information System (INIS)

    Huber, R.

    1996-01-01

    A potential life extending procedure for a nuclear reactor after, say, 40 years of service life, might in some circumstances be the replacement of the reactor pressure vessel. Neutron induced degradation of the vessel might make replacement by one of a different material composition desirable, for example. Although the replacement of heavy components, such as steam generators, has been possible for many years, the pressure vessel presents a much more demanding task if only because it is highly irradiated. Some preliminary feasibility studies by Siemens are reported for the two removal strategies that might be considered. These are removal of the entire pressure vessel in one piece and dismantling it into sections. (UK)

  20. Replacement Saltwell Pumping System Document Bibliography

    International Nuclear Information System (INIS)

    BELLOMY, J.R.

    2000-01-01

    This document bibliography is prepared to identify engineering documentation developed during the design of the Replacement Saltwell Pumping System. The bibliography includes all engineering supporting documents and correspondence prepared prior to the deployment of the system in the field. All documents referenced are available electronically through the Records Management Information System (RMIS). Major components of the Replacement Saltwell Pumping System include the Sundyne Canned Motor Pump, the Water Filter Skid, the Injection Water Skid and the Backflow Preventer Assembly. Drawing H-14-104498 provides an index of drawings (fabrication details, PandIDs, etc.) prepared to support development of the Replacement Saltwell Pumping System. Specific information pertaining to new equipment can be found in Certified Vendor Information (CVI) File 50124. This CVI file has been established specifically for new equipment associated with the Replacement Saltwell Pumping System

  1. The future of rapid bridge deck replacement.

    Science.gov (United States)

    2015-06-01

    Replacing aging, deteriorated infrastructure often requires road closures and traffic detours which impose : inconvenience and delay on commerce and members of the motoring public. Accelerated bridge construction : techniques often use precast member...

  2. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  3. Assessing Window Replacement Options | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  4. Logistic Vehicle System Replacement Cost Estimate

    National Research Council Canada - National Science Library

    Stinson, Margaret

    1998-01-01

    The Logistics Vehicle System (LVS) was originally fielded from 1985-1989. Most of the LVS fleet will reach end-of-service life in 2005, therefore the goal of the Logistics Vehicle System Replacement (LVSR...

  5. Steam-generator replacement sets new marks

    International Nuclear Information System (INIS)

    Beck, R.L.

    1995-01-01

    This article describes how, in one of the most successful steam-generator replacement experiences at PWRs worldwide, the V C Summer retrofit exceeded plant goals for critical-path duration, radiation, exposure, and radwaste generation. Intensive planning and teamwork, combined with the firm support of station management and the use of mockups to prepare the work crews for activity in a radiological environment, were key factors in the record performance achieved by South Carolina Electric and Gas Co (SCE and G) in replacing three steam generators at V C Summer nuclear station. The 97-day, two-hour breaker-to-breaker replacement outage -- including an eight-day delay for repair of leak in a small-bore seal-injection line of a reactor coolant pump (unrelated to the replacement activities) -- surpassed the project goal by over one day. Moreover, the outage was only 13 hours shy of the world record held by Virginia Power Co's North Anna Unit 1

  6. Nuclear facilities: repair and replacement technologies

    International Nuclear Information System (INIS)

    2005-01-01

    The oldest operating reactors are more than 35 years old and are now facing major maintenance operations. The first replacement of a pressurizer took place in autumn 2005 at the St-Lucie plant (Usa) while steam generators have been currently replaced since 1983. Nuclear industry has to adapt to this new market by proposing innovative technological solutions in the reactor maintenance field. This document gathers the 9 papers presented at the conference. The main improvements concern repair works on internal components of PWR-type reactors, the replacement of major components of the primary coolant circuit and surface treatments to limit the propagation of damages. The first paper shows that adequate design and feedback experience are good assets to manage the ageing of a nuclear unit. Another paper shows that a new repair method of a relief valve can avoid its replacement. (A.C.)

  7. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    Gleason, J.F.

    1990-03-01

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  8. Application of Shuttle Remote Manipulator System technology to the replacement of fuel channels in the Pickering CANDU reactor

    International Nuclear Information System (INIS)

    Stratton, D.; Butt, C.

    1982-04-01

    Spar Aerospace Limited of Toronto was the prime contractor to the National Research Council of Canada for the design and development of the Shuttle Remote Manipulator (SRMS). Spar is presently under contract to Ontario Hydro to design and build a Remote Manipulation Control System to replace the fuel channels in the Pickering A Nuclear Generating Station. The equipment may be used to replace the fuel channels in six other early generation CANDU reactors

  9. Machine replacement, Network Externalities and Investment Cycles

    OpenAIRE

    Juan Ruiz

    2003-01-01

    This paper presents a model where agents decide on the timing of replacement of ageing machines. The optimal replacement policy for an agent is influenced by other agents' decisions because the productivity of a particular vintage displays network externalities that set in with a lag. In equilibrium, agents follow innovation cycles with a frequency that is lower than optimal, so there is too much delay. One extreme case is the possibility of inefficient collapse: for some parameters there is ...

  10. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  11. Does Online Marketing Truly Replace Traditional Marketing?

    OpenAIRE

    Gunawan, Emilia Margareth

    2013-01-01

    This review explains the way how online marketing has been replacing traditional marketing in terms of marketing mix. This replacement might happen, because online marketing can give advantages, i.e., offering on-time delivery, increasing effectiveness of two way interactions between buyer and seller, and creating online communities (Szmigin, et al, 2005). The transition of atoms to bits format reflects that tangible products in traditional marketing is being digitalized. The marketing strate...

  12. Infective endocarditis following percutaneous pulmonary valve replacement

    DEFF Research Database (Denmark)

    Cheung, Gary; Vejlstrup, Niels; Ihlemann, Nikolaj

    2013-01-01

    Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult.......Infective endocarditis (IE) following percutaneous pulmonary valve replacement (PPVR) with the Melody valve is rarely reported. Furthermore, there are challenges in this diagnosis; especially echocardiographic evidence of vegetation within the prosthesis may be difficult....

  13. Essential Specification Elements for Heat Exchanger Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Bower, L.

    2015-07-01

    Performance upgrade and equipment degradation are the primary impetuses for a nuclear power plant to engage in the large capital cost project of heat exchanger replacement. Along with attention to these issues, consideration of heat exchanger Codes and Standards, material improvements, thermal redesign, and configuration are essential for developing User’s Design Specifications for successful replacement projects. The User’s Design Specification is the central document in procuring ASME heat exchangers. Properly stated objectives for the heat exchanger replacement are essential for obtaining the materials, configurations and thermal designs best suited for the nuclear power plant. Additionally, the code of construction required and the applied manufacturing standard (TEMA or HEI) affects how the heat exchanger may be designed or configured to meet the replacement goals. Knowledge of how Codes and Standards affect design and configuration details will aid in writing the User’s Design Specification. Joseph Oat Corporation has designed and fabricated many replacement heat exchangers for the nuclear power industry. These heat exchangers have been constructed per ASME Section III to various Code-Years or ASME Section VIII-1 to the current Code-Year also in accordance with TEMA and HEI. These heat exchangers have been a range of like-for-like replacement to complete thermal, material and configuration redesigns. Several examples of these heat exchangers with their Code, Standard and specification implications are presented. (Author.

  14. International examples of steam generator replacement

    International Nuclear Information System (INIS)

    Wiechmann, K.

    1993-01-01

    Since 1979-1980 a total of twelve nuclear power plants world-wide have had their steam generators replaced. The replacement of the Combustion steam generators in the Millstone-2 plant in the United States was completed very recently. Steam generator replacement activities are going on at present in four plants. In North Anna, the steam generators have been under replacement since January 1990. In Japan, preparations have been started for Genkai-1. Since January 1992, the two projects in Beznau-1, Switzerland, and Doel-3, Belgium, have bee planned and executed in parallel. Why steam generator replacement? There are a number of defect mechanisms which give rise to the need for early steam generator replacement. One of the main reasons is the use of Inconel-600 as material for the heating tubes. Steam generator heating tubes made of Inconel-600 have been known to exhibit their first defects due to stress corrosion cracking after less than one year of operation. (orig.) [de

  15. A replaceable reflective film for solar concentrators

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  16. Altering existing buildings in the UK

    International Nuclear Information System (INIS)

    Roberts, Simon

    2008-01-01

    The profiles of both existing housing and existing public and commercial buildings show that many have very poor thermal efficiency. The UK housing stock is replaced at a low rate of about 1% a year, so to cut energy use it is essential to address the challenges of existing buildings. This will involve reducing energy demand through passive measures such as retrofitted insulation, replacement of windows and proper airtightness, while ensuring adequate ventilation. Active measures include upgrading improved boilers and adding locally produced energy from wind, biomass, solar power and other sources. The introduction of Display Energy Certificates will increase energy awareness but there will also need to be a programme of increased demolition for the worst-performing homes. In addition, buildings will need to be adapted to cope with worse weather, higher temperatures and increased flood risk as climate change takes effect. Overheating, rather than excessive cold, is set to become a growing problem for householders and employees in existing UK buildings

  17. Iterative model building, structure refinement and density modification with the PHENIX AutoBuild wizard

    International Nuclear Information System (INIS)

    Terwilliger, Thomas C.; Grosse-Kunstleve, Ralf W.; Afonine, Pavel V.; Moriarty, Nigel W.; Zwart, Peter H.; Hung, Li-Wei; Read, Randy J.; Adams, Paul D.

    2008-01-01

    The highly automated PHENIX AutoBuild wizard is described. The procedure can be applied equally well to phases derived from isomorphous/anomalous and molecular-replacement methods. The PHENIX AutoBuild wizard is a highly automated tool for iterative model building, structure refinement and density modification using RESOLVE model building, RESOLVE statistical density modification and phenix.refine structure refinement. Recent advances in the AutoBuild wizard and phenix.refine include automated detection and application of NCS from models as they are built, extensive model-completion algorithms and automated solvent-molecule picking. Model-completion algorithms in the AutoBuild wizard include loop building, crossovers between chains in different models of a structure and side-chain optimization. The AutoBuild wizard has been applied to a set of 48 structures at resolutions ranging from 1.1 to 3.2 Å, resulting in a mean R factor of 0.24 and a mean free R factor of 0.29. The R factor of the final model is dependent on the quality of the starting electron density and is relatively independent of resolution

  18. Sustainable Buildings in Interaction

    DEFF Research Database (Denmark)

    Elle, Morten

    2007-01-01

    The first attempts to build sustainable buildings in Denmark were typically located on the countryside. The basic idea was to create buildings that were independent of the technical infrastructure. District heating has, however, been the dominating solution to heating in buildings in Denmark......, and the focus on sustainable building have gradually turned from special houses on the countryside to normally looking houses in the urban fabric, integrated in the technical infrastructure. Some new built urban areas in Denmark will, however, not have to be supplied with district heating – these developments...... are going to consist of passive houses. The first sustainable buildings were built by their users, and the user – building interaction still play a decisive role for the performance of the present sustainable buildings. The users have to understand how the building functions. Urban design is essential...

  19. Integrating Responsive Building Elements in Buildings

    DEFF Research Database (Denmark)

    Haase, Matthias; Amato, Alex; Heiselberg, Per

    2006-01-01

    energy strategies to develop guidelines and procedures for estimation of environmental performance of responsive building elements and integrated building concepts This paper introduces the ideas of this collaborative work and discusses its usefulness for Hong Kong and China. Special focus was put...

  20. Challenges in Commercial Buildings | Buildings | NREL

    Science.gov (United States)

    systems Assessing the energy and economic impacts of various technologies, giving priority to those that standardized language for commercial building energy audit data that can be used by software developers to exchange data between audit tools, and can be required by building owners and audit program managers to

  1. Bellanca building, Yellowknife : building envelope retrofit project

    Energy Technology Data Exchange (ETDEWEB)

    Rajewski, G. [A.D. Williams Engineering Inc., Edmonton, AB (Canada)

    2008-07-01

    The Bellanca building is a ten-story, commercial office building, located in Yellowknife, Northwest Territories. The owner was concerned about annual fuel consumption, relative to other buildings of similar size. Tenants reported cold drafts and some ice build-up had been reported in the past, on the exterior of the cladding. In addition, some water penetration had occurred during rainfall. This presentation provided background information on the Bellanca building and discussed a building envelope retrofit project. A.D. Williams was hired in late 2006 in order to provide an opinion on the present condition of the building envelope. This presentation described the site investigation and presented an interior and exterior review of the building. It also presented a thermographic survey in order to map thermal anomalies and establish trends. Following acceptance of the report on findings, one of five options was selected for further development. This included removal of existing cladding, exterior gypsum wallboard, fiberglass insulation and application of BASF Walltite CT foam, sheathing, rigid insulation, drainage plane and new cladding. The preliminary design was then presented. This paper also described the tender and award of the contract; construction phase; and substantial completion of the project. tabs, figs.

  2. Better Buildings Alliance, Advanced Rooftop Unit Campaign: Rooftop Unit Measurement and Verification (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    This document provides facility managers and building owners an introduction to measurement and verification (M&V) methods to estimate energy and cost savings of rooftop units replacement or retrofit projects to estimate paybacks or to justify future projects.

  3. Replacement of steam generators at Dampierre 1 France

    International Nuclear Information System (INIS)

    Bacot, J.; Chorain, M.; Collot, Y.; Dorimini, G.

    1991-01-01

    1990 was the year of the first steam generator replacement operation on EdF's facilities. The site chosen was Dampierre 1 (900 MW PWR unit with 3 primary coolant loops). The project was a thorough success characterized by: (1) A work schedule which was entirely met and even improved on: 70 work days from the end of fuel unloading authorizing start of work in the reactor building up to the end of refitting in readiness for the primary circuit hydraulic tests, i.e. a gain of one week compared with the forecast work schedule, (2) A final dosimetry less than 230 man-rem for a target of 450 man-rem, (3) Safety: no serious accidents during the 300,000 hours worked. It also provided practical proof of French industry's capacity to undertake an SGR operation. (author)

  4. Building integrated concentrating photovoltaics: A review

    International Nuclear Information System (INIS)

    Chemisana, Daniel

    2011-01-01

    For building integration, Concentrating Photovoltaic (CPV) systems can offer a host of advantages over conventional flat panel devices, the most notable being: a higher electrical conversion efficiency in the PV cells, better use of space, ease of recycling of constituent materials, and reduced use of toxic products involved in the PV cells' production process. However, the viability of Building-Integrated Concentrating PV (BICPV) systems is dependent on their ability to offer a comparative economic advantage over flat panel photovoltaic technologies whose market prices are decreasing from day to day and which offer other advantages such as ease of replacement of structural elements. A comparative analysis is presented of the main existing CPV systems' suitability for use in buildings, in which the different challenges specific to integration of each system are discussed. The systems are categorized by type of concentration technology and concentration factor. (author)

  5. Applied building physics

    CERN Document Server

    Hens, Hugo S L C

    2012-01-01

    The energy crises of the 1970s, persisting moisture problems, complaints about sick buildings, thermal, visual and olfactory discomfort, and the move towards more sustainability in building construction have pushed Building Physics to the forefront of building innovation. The societal pressure to diminish energy consumption in buildings without impairing usability acted as a trigger to activate the whole notion of performance based design and construction. As with all engineering sciences, Building Physics is oriented towards application, which is why, after a first book on fundamentals this s

  6. Design and manufacture of steam generators for replacement

    International Nuclear Information System (INIS)

    Hirano, Hiroshi; Kuri, Syuhei

    1995-01-01

    The basic specification of the steam generators for replacement as heat exchangers (the pressure, temperature, flow rate and thermal output on primary and secondary sides) is set same as that of steam generators before replacement, but the latest design reflecting the operation experience obtained so far and taking the countermeasures for preventing heating tube damage in it is adopted, such as the heating tubes made of TT 690 alloy, the tube support plates with four-lobe shape tube holes made of stainless steel, the stainless steel rest fittings of three in one set and so on. After the heating tube break accident in Mihama No. 2 plant, the quality control was further strengthened. The comparison of the specifications of the steam generators of respective plants before and after the replacement is shown. The main objective of improving steam generators is the heightening of the reliability of heating tubes against intergranular attack and primary water stress corrosion cracking. The improvements of heating tube material, tube support plate material, secondary side heat flow, the shape of tube holes of tube support plates, the method of expanding heating tubes, and vibration-controlling fittings are explained. As to the manufacturing procedure and quality control, the manufacture of raw materials, the build-up welding of tube plates, the manufacture of lower half shell plates, the tube hole making of support plates, the insection of outer cylinder, flow rate distribution plate. Support plates and heating tubes, the sealing welding and expanding of heating tubes, the fixing of rest fittings, the manufacture and fixing of water chamber cover, the manufacture of upper half shell, the fixing of parts inside it, the final joint and inspection are described. (K.I.)

  7. Neutron beam facilities at the Australian Replacement Research Reactor

    International Nuclear Information System (INIS)

    Kennedy, Shane; Robinson, Robert; Hunter, Brett

    2001-01-01

    Australia is building a research reactor to replace the HIFAR reactor at Lucas Heights by the end of 2005. Like HIFAR, the Replacement Research Reactor will be multipurpose with capabilities for both neutron beam research and radioisotope production. It will be a pool-type reactor with thermal neutron flux (unperturbed) of 4 x 10 14 n/cm 2 /sec and a liquid D 2 cold neutron source. Cold and thermal neutron beams for neutron beam research will be provided at the reactor face and in a large neutron guide hall. Supermirror neutron guides will transport cold and thermal neutrons to the guide hall. The reactor and the associated infrastructure, with the exception of the neutron beam instruments, is to be built by INVAP S.E. under contract. The neutron beam instruments will be developed by ANSTO, in consultation with the Australian user community. This status report includes a review the planned scientific capabilities, a description of the facility and a summary of progress to date. (author)

  8. Requirements for existing buildings

    DEFF Research Database (Denmark)

    Thomsen, Kirsten Engelund; Wittchen, Kim Bjarne

    This report collects energy performance requirements for existing buildings in European member states by June 2012.......This report collects energy performance requirements for existing buildings in European member states by June 2012....

  9. Green Building Standards

    Science.gov (United States)

    Many organizations have developed model codes or rating systems that communities may use to develop green building programs or revise building ordinances. Some of the major options are listed on this page.

  10. Introduction: Green Building Handbook

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2010-08-01

    Full Text Available By recognising the specific environmental challenges facing South Africa, mindful of the government‘s commitment to reducing South Africa‘s Greenhouse gas emissions, and acknowledging the need to build social cohesion, the Green Building Handbook...

  11. Integrated Building Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Abstract: Building health management is an important part in running an efficient and cost-effective building. Many problems in a building’s system can go undetected...

  12. Building the Korogwe Laboratory

    DEFF Research Database (Denmark)

    Knudsen, Jakob; von Seidlein, Lorenz; Richard, Jean Pierre

    2011-01-01

    An illustrated description of the building of a biomedical research laboratory in Korogwe, Tanzania.......An illustrated description of the building of a biomedical research laboratory in Korogwe, Tanzania....

  13. Sustainable Building Operation

    DEFF Research Database (Denmark)

    Jensen, Jesper Ole

    2009-01-01

    of sustainable building operation and a survey amongst building administrators from the private and the social housing sector. Our results show that there are many good examples on sustainable building operation in Danish housing estates, where local building managers, residents etc. have gained impressive......Energy-savings in the existing building stock have becomes a main goal in national and international policies. Often focus is on building-renovations, whereas the potential of sustainable building operation to a large extent has been neglected. Nevertheless, international research as well...... as practical experiences from Danish housing estates indicates that there are large potentials for energy savings by focusing on the operation of the buildings. We suggest that in order to achieve sustainability in the existing housing, renovation and operations should be seen as integrated parts...

  14. Robotic buildings(s)

    NARCIS (Netherlands)

    Bier, H.H.

    2014-01-01

    Technological and conceptual advances in fields such as artificial intelligence, robotics, and material science have enabled robotic building to be in the last decade prototypically implemented. In this context, robotic building implies both physically built robotic environments and robotically

  15. Environmental indicators for buildings

    DEFF Research Database (Denmark)

    Dammann, Sven

    Environmental Indicators for Buildings are studied using two different perspectives: with a technological, environmental scientific departing point and with a social scientific departing point. Different relevant groups in the building sector are identified and analysed, using the Social...

  16. Building Design & Construction - Sustainability

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-11-01

    Offers a brief history of green building; presents the results of a specially commissioned survey; and analyzes the chief trends, issues, and published research, based on interviews with dozens of experts and participants in green building.

  17. Buildings interoperability landscape - Draft

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Dave B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Stephan, Eric G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Corbin, Charles D. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Widergren, Steven E. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2015-02-01

    Buildings are an integral part of our nation’s energy economy. The advancement in information and communications technology (ICT) has revolutionized energy management in industrial facilities and large commercial buildings. As ICT costs decrease and capabilities increase, buildings automation and energy management features are transforming the small-medium commercial and residential buildings sectors. A vision of a connected world in which equipment and systems within buildings coordinate with each other to efficiently meet their owners’ and occupants’ needs, and where buildings regularly transact business with other buildings and service providers (such as gas and electric service providers) is emerging. However, while the technology to support this collaboration has been demonstrated at various degrees of maturity, the integration frameworks and ecosystems of products that support the ability to easily install, maintain, and evolve building systems and their equipment components are struggling to nurture the fledging business propositions of their proponents.

  18. Energy conservation according to the building codes of the National Board of Housing, Building and Planning; Energihushaallning enligt Boverkets byggregler

    Energy Technology Data Exchange (ETDEWEB)

    2009-10-15

    To comply with international and national targets for energy use, the National Board has adopted rules setting the levels to be met in order to conserve energy in buildings. The rules for buildings are shown in Boverkets building regulations (BBR). The BBR lists comprehensive requirements in order to ensure that a building must not use more than a certain number of kilowatt hours per square meter and year. There are more detailed requirements for thermal insulation, heating, cooling and air conditioning installations, efficient use of electricity and installation of metering systems for monitoring of building energy. The latest version of the BBR came into force on February 1, 2009 and has more stringent requirements for the buildings heated by electricity or comfort cooling powered by electricity. This handbook presents comments and answers to questions about the new rules for energy conservation. It replaces our previous handbook 'Thermal calculations'

  19. Structural considerations in steam generator replacement

    International Nuclear Information System (INIS)

    Bertheau, S.R.; Gazda, P.A.

    1991-01-01

    Corrosion of the tubes and tube-support structures inside pressurized water reactor (PWR) steam generators has led many utilities to consider a replacement of the generators. Such a project is a major undertaking for a utility and must be well planned to ensure an efficient and cost-effective effort. This paper discusses various structural aspects of replacement options, such as total or partial generator replacement, along with their associated pipe cuts; major structural aspects associated with removal paths through the equipment hatch or through an opening in the containment wall, along with the related removal processes; onsite movement and storage of the generators; and the advantages and disadvantages of the removal alternatives. This paper addresses the major structural considerations associated with a steam generator replacement project. Other important considerations (e.g., licensing, radiological concerns, electrical requirements, facilities for management and onsite administrative activities, storage and fabrication activities, and offsite transportation) are not discussed in this paper, but should be carefully considered when undertaking a replacement project

  20. Building 431 fire tests

    International Nuclear Information System (INIS)

    Alvares, N.J.; Beason, D.G.; Ford, H.W.; Magee, M.W.

    1977-01-01

    An extensive discussion of considerations for fire protection in the LLL mirror fusion test facility (MFTF) is presented. Because of the large volume and high bays of the building, sufficient data on fire detection is unavailable. Results of fire detection tests using controlled fire sources in the building are presented. Extensive data concerning the behavior of the building atmosphere are included. Candidate fire detection instrumentation and extinguishing systems for use in the building are briefly reviewed

  1. Hip or knee replacement - in the hospital after

    Science.gov (United States)

    Hip replacement surgery - after - self-care; Knee replacement surgery - after - self-care ... taking walks in the hallways with help. After knee replacement, some surgeons recommend using a continuous passive ...

  2. Dutch Building Decree

    NARCIS (Netherlands)

    Scholten, N.P.M.

    2000-01-01

    On the 1 October 1992 a change in the Dutch building legislation took effect: the revised Housing Act, the Building Decree and the technical documents related to this legislation came into force. This publication contains an English translation of the Building Decree. In order to give an idea of the

  3. Management Of Building Projects

    OpenAIRE

    Niko Majdandzic; Tadija Lovric; Vido Peric

    2006-01-01

    In this work we have shown the concept of logistic support in management in building production and in building of objects, which is realised in Enterprise resource Planning – ERP system ERPINSG, developed in Informatic firm Informatic engineering – ININ in Slavonski Brod, and in cooperation with scientists of catedra for informatics of Faculty of Mechanical Engineering and users from building firms.

  4. Concepts in Building Firesafety.

    Science.gov (United States)

    Egan, M. David

    The goal of this book is to present in a graphical format the principles of design for building firesafety. The book's more than 270 illustrations represent the core of its coverage of factors affecting fire ignition and spread in buildings, building site planning for fire suppression and occupant rescue operations, protection by building…

  5. Green Building Research Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Sailor, David Jean [Portland State Univ., Portland, OR (United States)

    2013-12-29

    This project provided support to the Green Building Research Laboratory at Portland State University (PSU) so it could work with researchers and industry to solve technical problems for the benefit of the green building industry. It also helped to facilitate the development of PSU’s undergraduate and graduate-level training in building science across the curriculum.

  6. Three Steam Generator Replacement Projects in 1995

    International Nuclear Information System (INIS)

    Holz, R.; Clavier, G.

    1996-01-01

    Since the companies Siemens AG and Framatome S. A. joined their experience and efforts in the field of steam generator replacements and formed a consortium in 1991, the following projects were performed in 1995: Ringhals 3, Tihange 3 and Asco 1. Further projects will follow in 1996, i. e., Doel 4 and Asco 2. Currently, this European consortium is bidding for the contract to replace the steam generators at the Krsko NPP and hopes to be awarded in 1996. An overview of the way the Consortium Siemens and Framatome approaches SG replacement projects is given based on the projects performed in 1995. Various aspects of project planning, management, licensing, personnel qualification and techniques used on site will be discussed. (author)

  7. REPLACEMENT IN RABBIT HERDS: A REVIEW

    Directory of Open Access Journals (Sweden)

    Ibrahim F.M. Marai

    2010-08-01

    Full Text Available Doe rabbit's replacement constitutes the annual renewal rate of new breeders that must be incorporated into the production stock. Criterion for culling non-productive animals differs significantly among fryer production colonies, foundation stocks and a colony with continuous enzootic disease or continuous malnourishment. In commercial rabbit production, good management improves the health and productivity of the entire herd, by reducing the all-time high replacement rates and improving economic viability. In the present article, a comprehensive review of numerous experiences in the rabbit production field of different countries, was presented. Basic recommendations for professional breeders were highlighted, covering critical issues such as the need for continuously upgrading the health status of the colony, the positive effect of   genetic selection and the nutritional conditioning and special treatment of young does being groomed as future replacements.

  8. Optimal timing for intravascular administration set replacement.

    Science.gov (United States)

    Ullman, Amanda J; Cooke, Marie L; Gillies, Donna; Marsh, Nicole M; Daud, Azlina; McGrail, Matthew R; O'Riordan, Elizabeth; Rickard, Claire M

    2013-09-15

    The tubing (administration set) attached to both venous and arterial catheters may contribute to bacteraemia and other infections. The rate of infection may be increased or decreased by routine replacement of administration sets. This review was originally published in 2005 and was updated in 2012. The objective of this review was to identify any relationship between the frequency with which administration sets are replaced and rates of microbial colonization, infection and death. We searched The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library 2012, Issue 6), MEDLINE (1950 to June 2012), CINAHL (1982 to June 2012), EMBASE (1980 to June 2012), reference lists of identified trials and bibliographies of published reviews. The original search was performed in February 2004. We also contacted researchers in the field. We applied no language restriction. We included all randomized or controlled clinical trials on the frequency of venous or arterial catheter administration set replacement in hospitalized participants. Two review authors assessed all potentially relevant studies. We resolved disagreements between the two review authors by discussion with a third review author. We collected data for seven outcomes: catheter-related infection; infusate-related infection; infusate microbial colonization; catheter microbial colonization; all-cause bloodstream infection; mortality; and cost. We pooled results from studies that compared different frequencies of administration set replacement, for instance, we pooled studies that compared replacement ≥ every 96 hours versus every 72 hours with studies that compared replacement ≥ every 48 hours versus every 24 hours. We identified 26 studies for this updated review, 10 of which we excluded; six did not fulfil the inclusion criteria and four did not report usable data. We extracted data from the remaining 18 references (16 studies) with 5001 participants: study designs included neonate and adult

  9. Replacement of the JRR-3 computer system

    Energy Technology Data Exchange (ETDEWEB)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2000-10-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  10. Testosterone Replacement, Muscle Strength, and Physical Function

    Directory of Open Access Journals (Sweden)

    You-Seon Nam

    2018-05-01

    Full Text Available Muscle strength and physical function decrease in older men, as do testosterone levels. Nonetheless, the effects of testosterone replacement therapy on muscle strength and physical function remain inconclusive and equivocal. We conducted a rapid systematic review, the results of which showed that testosterone replacement does not affect muscle strength (measured by hand grip strength and leg muscle strength, although it may increase physical function (measured by the 6-minute walk test, Physical Activity Scale for the Elderly score, and other physical performance tests. However, most of the studies were conducted in the United States or Europe and did not include participants from Asian or other ethnic backgrounds; therefore, further studies are needed to evaluate the effects of testosterone replacement in a broader population.

  11. Dead pixel replacement in LWIR microgrid polarimeters.

    Science.gov (United States)

    Ratliff, Bradley M; Tyo, J Scott; Boger, James K; Black, Wiley T; Bowers, David L; Fetrow, Matthew P

    2007-06-11

    LWIR imaging arrays are often affected by nonresponsive pixels, or "dead pixels." These dead pixels can severely degrade the quality of imagery and often have to be replaced before subsequent image processing and display of the imagery data. For LWIR arrays that are integrated with arrays of micropolarizers, the problem of dead pixels is amplified. Conventional dead pixel replacement (DPR) strategies cannot be employed since neighboring pixels are of different polarizations. In this paper we present two DPR schemes. The first is a modified nearest-neighbor replacement method. The second is a method based on redundancy in the polarization measurements.We find that the redundancy-based DPR scheme provides an order-of-magnitude better performance for typical LWIR polarimetric data.

  12. Replacement of the JRR-3 computer system

    International Nuclear Information System (INIS)

    Kato, Tomoaki; Kobayashi, Kenichi; Suwa, Masayuki; Mineshima, Hiromi; Sato, Mitsugu

    2000-01-01

    The JRR-3 computer system contributes to stable operation of JRR-3 since 1990. But now about 10 years have passed since it was designed and some problems have occurred. Under these situations, we should replace the old computer system for safe and stable operation. In this replacement, the system is improved as regards man-machine interface and efficiency about maintenance. The new system consists of three functions, which are 'the function of management for operation information' (renewal function), 'the function of management for facility information' (new function) and the function of management for information publication' (new function). By this replacement, New JRR-3 computer system can contribute to safe and stable operation. (author)

  13. Postmenopausal hormone replacement therapy--clinical implications

    DEFF Research Database (Denmark)

    Ravn, S H; Rosenberg, J; Bostofte, E

    1994-01-01

    The menopause is defined as cessation of menstruation, ending the fertile period. The hormonal changes are a decrease in progesterone level, followed by a marked decrease in estrogen production. Symptoms associated with these hormonal changes may advocate for hormonal replacement therapy....... This review is based on the English-language literature on the effect of estrogen therapy and estrogen plus progestin therapy on postmenopausal women. The advantages of hormone replacement therapy are regulation of dysfunctional uterine bleeding, relief of hot flushes, and prevention of atrophic changes...... in the urogenital tract. Women at risk of osteoporosis will benefit from hormone replacement therapy. The treatment should start as soon after menopause as possible and it is possible that it should be maintained for life. The treatment may be supplemented with extra calcium intake, vitamin D, and maybe calcitonin...

  14. Severe Heterotopic Ossification following Total Knee Replacement

    Directory of Open Access Journals (Sweden)

    Alexander L. Dodds

    2014-01-01

    Full Text Available Although the incidence of minor heterotopic ossification is probably higher than what is usually expected, severe heterotopic ossification (HO is an extremely rare event following total knee replacement surgery. We present the case of a 66-year-old woman who initially had achieved an excellent range of motion following bilateral uncemented rotating platform total knee replacement, before presenting with pain and loss of range of motion at 2 months after surgery. Severe HO was diagnosed on X-rays. Treatment consisted of nonoperative measures only, including physiotherapy with hydrotherapy and anti-inflammatories. She eventually regained her range of motion when seen at 8 months after operation. This case illustrates that nonoperative treatment without the use of radiotherapy or surgery can be used to safely resolve stiffness caused by HO after total knee replacement.

  15. Imaging techniques in transcatheter aortic valve replacement

    Directory of Open Access Journals (Sweden)

    Quaife RA

    2013-11-01

    Full Text Available Robert A Quaife, Jennifer Dorosz, John C Messenger, Ernesto E Salcedo Division of Cardiology, University of Colorado, Aurora, CO, USA Abstract: Calcific aortic stenosis is now understood as a complex valvular degenerative process sharing many risk factors with atherosclerosis. Once patients develop symptomatic calcific aortic stenosis, the only effective treatment is aortic valve replacement. In the past decade, transcatheter aortic valve replacement (TAVR has been developed as an alternative to surgery to treat severe calcific aortic stenosis. Cardiac imaging plays a pivotal role in the contemporary management of patients with calcific aortic stenosis, and particularly in patients being considered for TAVR, who demand detailed imaging of the aortic valve apparatus. In this review, we highlight the role of cardiac imaging for patient selection, procedural guidance, and evaluation of results of TAVR. Keywords: aortic stenosis, cardiovascular imaging, transcutaneous aortic valve replacement

  16. Renal replacement therapy in healthy adult horses.

    Science.gov (United States)

    Wong, D M; Witty, D; Alcott, C J; Sponseller, B A; Wang, C; Hepworth, K

    2013-01-01

    Renal replacement therapy (RRT) has been implemented extensively in people to facilitate recovery from acute renal failure (ARF). RRT has not been explored in horses, but might provide a further treatment option in horses with ARF. To investigate efficacy and safety of RRT in horses. Five healthy adult horses. A prospective study was performed on horses restrained in stocks and intravenously connected to a commercial RRT machine to allow continuous venovenous hemodiafiltration to be performed for 6 hours. The RRT machine was set at the following flow rates: blood flow rate 250 mL/min; dialysate rate 3,000 mL/h; prefilter replacement pump 3,000 mL/h; and postfilter replacement pump rate 2,000 mL/h. Balanced electrolyte solution was used as dialysate and replacement fluid. Heart rate, respiratory rate, body temperature, direct arterial blood pressure, urine output, and various clinicopathologic parameters were measured over the study period. Renal replacement therapy was successfully performed in horses, resulting in a mean creatinine clearance of 0.127 mL/kg/min (68.9 mL/min) and urea reduction ratio of 24%. No adverse effects were detected although a significant decrease in rectal temperature was observed (P ≤ .007). A significant increase in serum phosphorus (P ≤ .001) and decrease in BUN (P replacement therapy can safely and effectively be used in adult horses. Copyright © 2013 by the American College of Veterinary Internal Medicine.

  17. Radiological evaluation of failed total hip replacement

    International Nuclear Information System (INIS)

    Raspa, V.; Aldrovandi, S.; Pompei, G.

    1988-01-01

    The retrospective study of 50 operated cases of cemented total hip replacement and a review of the literature enabled the authors to define the radiological features of the above-mentioned condition. These features include one or more of the following signs: calcar reabsorption, lacunar erosions, modified relatioships between the prosthesis components, sepsis and loosening, periarticular calcifications dislocation and fracture of prosthesis components. Careful evaluation of these radiological features is extremely important for both an early diagnosis of failed total hip replacement and the choice of an adequate surgical treatment

  18. Criteria for the replacement of restorations

    DEFF Research Database (Denmark)

    Wilson, Nairn; Lynch, Christopher; Brunton, Paul Brunton

    2016-01-01

    The replacement of a restoration is one of the most common procedures in dentistry. However, the criteria for such intervention, excluding catastrophic failure and persistent discomfort and pain, continue to be the subject of considerable debate. The decision-making process remains subjective...... on the part of the treating clinician, while the evidence base for refurbishment and repair rather than replacement for the management of defective and failing restorations continues to grow and strengthen. This article, prepared as an Academy of Operative Dentistry European Section consensus publication...

  19. Fuzzy logic application for extruders replacement problem

    Directory of Open Access Journals (Sweden)

    Edison Conde Perez dos Santos

    2017-03-01

    Full Text Available In a scenario of uncertainty and imprecision, before taking the replacement analysis, a manager needs to consider the uncertain reality of a problem. In this scenario, the fuzzy logic makes an excellent option. Therefore, it is necessary to make a decision based on the fuzzy model. This study is based on the comparison of two methodologies used in the problem of asset replacement. The study, thus, was based on a comparison between two extruders for polypropylene yarn bibliopegy, comparing mainly the costs involved in maintaining the equipment.

  20. Valve assembly having remotely replaceable bearings

    International Nuclear Information System (INIS)

    Johnson, E.R.; Tanner, D.E.

    1980-01-01

    A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings

  1. Courthouse Prototype Building

    Energy Technology Data Exchange (ETDEWEB)

    Malhotra, Mini [ORNL; New, Joshua Ryan [ORNL; Im, Piljae [ORNL

    2018-02-01

    As part of DOE's support of ANSI/ASHRAE/IES Standard 90.1 and IECC, researchers at Pacific Northwest National Laboratory (PNNL) apply a suite of prototype buildings covering 80% of the commercial building floor area in the U.S. for new construction. Efforts have started on expanding the prototype building suite to cover 90% of the commercial building floor area in the U.S., by developing prototype models for additional building types including place of worship, public order and safety, public assembly. Courthouse is courthouse is a sub-category under the “Public Order and Safety" building type category; other sub-categories include police station, fire station, and jail, reformatory or penitentiary.ORNL used building design guides, databases, and documented courthouse projects, supplemented by personal communication with courthouse facility planning and design experts, to systematically conduct research on the courthouse building and system characteristics. This report documents the research conducted for the courthouse building type and proposes building and system characteristics for developing a prototype building energy model to be included in the Commercial Building Prototype Model suite. According to the 2012 CBECS, courthouses occupy a total of 436 million sqft of floor space or 0.5% of the total floor space in all commercial buildings in the US, next to fast food (0.35%), grocery store or food market (0.88%), and restaurant or cafeteria (1.2%) building types currently included in the Commercial Prototype Building Model suite. Considering aggregated average, courthouse falls among the larger with a mean floor area of 69,400 sqft smaller fuel consumption intensity building types and an average of 94.7 kBtu/sqft compared to 77.8 kBtu/sqft for office and 80 kBtu/sqft for all commercial buildings.Courthouses range in size from 1000 sqft to over a million square foot building gross square feet and 1 courtroom to over 100 courtrooms. Small courthouses

  2. Renewable Substitutability Index: Maximizing Renewable Resource Use in Buildings

    Science.gov (United States)

    In order to achieve a material and energy balance in buildings that is sustainable in the long run, there is an urgent need to assess the renewable and non-renewable resources used in the manufacturing process and to progressively replace non-renewable resources with renewables. ...

  3. Green Buildings and Health.

    Science.gov (United States)

    Allen, Joseph G; MacNaughton, Piers; Laurent, Jose Guillermo Cedeno; Flanigan, Skye S; Eitland, Erika Sita; Spengler, John D

    2015-09-01

    Green building design is becoming broadly adopted, with one green building standard reporting over 3.5 billion square feet certified to date. By definition, green buildings focus on minimizing impacts to the environment through reductions in energy usage, water usage, and minimizing environmental disturbances from the building site. Also by definition, but perhaps less widely recognized, green buildings aim to improve human health through design of healthy indoor environments. The benefits related to reduced energy and water consumption are well-documented, but the potential human health benefits of green buildings are only recently being investigated. The objective of our review was to examine the state of evidence on green building design as it specifically relates to indoor environmental quality and human health. Overall, the initial scientific evidence indicates better indoor environmental quality in green buildings versus non-green buildings, with direct benefits to human health for occupants of those buildings. A limitation of much of the research to date is the reliance on indirect, lagging and subjective measures of health. To address this, we propose a framework for identifying direct, objective and leading "Health Performance Indicators" for use in future studies of buildings and health.

  4. Commercial Buildings Characteristics, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-29

    Commercial Buildings Characteristics 1992 presents statistics about the number, type, and size of commercial buildings in the United States as well as their energy-related characteristics. These data are collected in the Commercial Buildings Energy Consumption Survey (CBECS), a national survey of buildings in the commercial sector. The 1992 CBECS is the fifth in a series conducted since 1979 by the Energy Information Administration. Approximately 6,600 commercial buildings were surveyed, representing the characteristics and energy consumption of 4.8 million commercial buildings and 67.9 billion square feet of commercial floorspace nationwide. Overall, the amount of commercial floorspace in the United States increased an average of 2.4 percent annually between 1989 and 1992, while the number of commercial buildings increased an average of 2.0 percent annually.

  5. Smart buildings: Energy efficient conditioning of building occupants

    NARCIS (Netherlands)

    Zeiler, W.; Houten, van M.A.; Boxem, G.; Vehler, R.; Verhoeven, M.; Fremouw, M.

    2009-01-01

    To further optimize energy performance of buildings, intelligent building control offers new possibilities. Intelligent Software Agents (ISA) can be implemented at different levels of building automation. Individual agents for individual climate control for each user of the building in combination

  6. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Etalle, Sandro; Palamidessi, Catuscia

    1999-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  7. Rapid replacement/construction of bridges.

    Science.gov (United States)

    2012-11-01

    Bridges are a key element of the transportation system because they control system capacity and are normally built at : the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or : reconstructed i...

  8. The Replacement Operation for CCP Programs

    NARCIS (Netherlands)

    Bertolino, Marco; Bossi, Annalisa; Etalle, Sandro; Palamidessi, Catuscia

    2000-01-01

    The Replacement is a very powerful transformation operation which - both within the functional paradigm as well as within the logic programming one - can micic the most common transformation operations such as unfold, fold, switching, distribution. Because of this flexibility , it can be incorrect

  9. Prosthesis infections after orthopedic joint replacement

    DEFF Research Database (Denmark)

    Song, Zhijun; Borgwardt, Lotte; Høiby, Niels

    2013-01-01

    Prosthesis-related infection is a serious complication for patients after orthopedic joint replacement, which is currently difficult to treat with antibiotic therapy. Consequently, in most cases, removal of the infected prosthesis is the only solution to cure the infection. It is, therefore...

  10. Strategic Capital Budgeting : Asset Replacement Under Uncertainty

    NARCIS (Netherlands)

    Pawlina, G.; Kort, P.M.

    2001-01-01

    We consider a firm's decision to replace an existing production technology with a new, more cost-efficient one.Kulatilaka and Perotti [1998, Management Science] nd that, in a two-period model, increased product market uncertainty could encourage the firm to invest strategically in the new

  11. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  12. of surfactant replacement therapy at Johannesburg Hospital ...

    African Journals Online (AJOL)

    To assess the impact of surfactant replacement therapy (SRl) on the outcome of ... oxygen requirements) was compared with that of a historical control group of ... The use of SRT added to the total cost of treating a patient ventilated for HMD.

  13. vein thrombosis in elective hip replacement

    African Journals Online (AJOL)

    A consensus forum was convened to evaluate the economic considerations associated with prophylaxis against thrombo-embolic disease in patients undergoing hip replacement therapy in South Africa. This forum consists of orthopaedic surgeons, vascular surgeons and a statistician. Methods. The forum was instructed to ...

  14. Mechanical Aortic Valve Replacement in Octogenarian

    Directory of Open Access Journals (Sweden)

    Irfan Tasoglu

    2013-10-01

    Full Text Available Aim: This study analyzes the long-term outcomes of mechanical aortic valve replacement in octogenarian patients. Material and Method: A retrospective review was performed on 23 octogenarian patients who underwent mechanical aortic valve replacement. Hospital mortality, postoperative intensive care unit stay, hospital stay and long-term results was examined. Estimates of the cumulative event mortality rate were calculated by the Kaplan-Meier method. Results: The mean age of all patients was 82.9±2.3 years and most were men (65.22%. The median ejection fraction was 45%. 73.91% of patients were in New York Heart Association class III-IV. Thirteen patients (56.52% in this study underwent combined procedure, the remaining 10 (43.48% patients underwent isolated aortic valve replacement. The most common valve size was 23 mm. The mean intensive care unit stay was 1.76±1.14 days. The mean hospital stay was 9.33±5.06 days. No complications were observed in 56.52% patients during their hospital stay. The overall hospital mortality was 8.7%. Follow-up was completed for all 23 patients. Median follow-up time was 33 months (1-108 months. Actuarial survival among discharged from hospital was 59% at 5 years. Discussion: Mechanical aortic valve replacement is a safe procedure in octogenarian patients and can be performed safely even in combined procedure.

  15. 5/8'' baffle bolt replacement

    International Nuclear Information System (INIS)

    Pinaud, T.; Grypczynski, D.

    1999-01-01

    Both Framatome Nuclear Services in France and its U.S. arm, FT1, are now equipped with baffle bolt inspection and replacement packages. These packages allow them to tackle baffle bold degradation on both two- and three-loop nuclear power plants. Framatome and FT1 together are world leaders in addressing reactor vessel internal bolting concerns

  16. Optimal strategies for a replacement model

    NARCIS (Netherlands)

    Bruns, P.B.

    2000-01-01

    We examine a replacement system with discrete-time Markovian deterioration and finite state space $\\{0,\\ldots,N\\}$. State 0 stands for a new system, and the higher the state the worse the system; a system in state $N$ is considered to be in a {\\it bad state}. We impose the condition that the

  17. Who Will Replace Those Vanishing Execs?

    Science.gov (United States)

    Geber, Beverly

    2000-01-01

    Many top-level managers are retiring early. Programs to prepare their replacements have been scaled back. Many companies are offering phased retirement plans, redesigning jobs, and paying for spouses to go along on business trips to keep their managers a little longer. (JOW)

  18. Probability Issues in without Replacement Sampling

    Science.gov (United States)

    Joarder, A. H.; Al-Sabah, W. S.

    2007-01-01

    Sampling without replacement is an important aspect in teaching conditional probabilities in elementary statistics courses. Different methods proposed in different texts for calculating probabilities of events in this context are reviewed and their relative merits and limitations in applications are pinpointed. An alternative representation of…

  19. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Baker, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  20. Heart valve replacements with regenerative capacity

    NARCIS (Netherlands)

    Dijkman, P.E.; Fioretta, E.S.; Frese, L.; Pasqualini, F.S.; Hoerstrup, S.P.

    2016-01-01

    The incidence of severe valvular dysfunctions (e.g., stenosis and insufficiency) is increasing, leading to over 300,000 valves implanted worldwide yearly. Clinically used heart valve replacements lack the capacity to grow, inherently requiring repetitive and high-risk surgical interventions during

  1. Older Person's Guide to Joint Replacement

    Science.gov (United States)

    ... who prep for surgery and follow through with physical therapy afterward can further boost their odds of a good outcome. If you’re considering joint replacement surgery, here’s what the experts with the American Geriatrics Society’s Foundation for Health in Aging (FHA) suggest: Ask ...

  2. Continuous vasopressin replacement in diabetes insipidus.

    OpenAIRE

    Ralston, C; Butt, W

    1990-01-01

    Five children who developed diabetes insipidus as a manifestation of severe brain injury received continuous intravenous treatment with a solution containing both aqueous vasopressin and appropriate crystalloid replacement. Polyuria, hypernatraemia, and decreased urine osmolalities were safely corrected in all patients within eight to 28 hours.

  3. CANDU-PHW fuel channel replacement experience

    International Nuclear Information System (INIS)

    Dunn, J.T.; Kakaria, B.K.

    1982-09-01

    One of the main characteristics of the CANDU pressurized heavy water reactor is the use of pressure tubes rather than one large pressure vessel to contain the fuel and coolant. This provides an inherent design capability to permit their replacement in an expeditious manner, without seriously affecting the high capacity factors of the reactor units. Of th eight Ontario Hydro commercial nuclear generating units, the lifetime performance places seven of them (including two that have had some of their fuel channels replaced), in the top ten positions in the world's large nuclear-electric unit performance ranking. Pressure tube cracks in the rolled joint region have resulted in 70 fuel channels being replaced in three reactor units, the latest being at the Bruce Nuclear Generating Station 'A', Unit 2 in February 1982. The rolled joint design and rolling procedures have been modified to eliminate this problem on CANDU units subsequent to Bruce 'A'. This paper describes the CANDU pressure tube performance history and expectations, and the tooling and procedures used to carry out the fuel channel replacement

  4. Telerehabilitation Feasibility in Total Joint Replacement

    Directory of Open Access Journals (Sweden)

    Mark J. Nelson

    2017-11-01

    Full Text Available Despite documented benefits, many Total Joint Replacement (TJR patients find it difficult to access rehabilitation following discharge from hospital. One solution to improve access for TJR patients is telerehabilitation. This study aimed to assess the feasibility of introducing a telerehabilitation program for TJR patients.   TJR patients at QEII Jubilee Hospital were invited to complete a questionnaire regarding their access, feelings towards and preferences in using technology. Seventy-five patients were recruited. Most patients had computer access (72% and internet (69% at home. Sixty-five percent of participants were willing to participate in telerehabilitation. A significant difference was found between older and younger patients. Watching videos on an electronic device was the preferred method for a technology-based home exercise program and phone call the preferred method of communication.  Results indicate telerehabilitation in the TJR population is feasible from the perspective of access to, feelings toward, and preferences for technology. Keywords: Hip replacement, Knee replacement, Telerehabilitation, Telemedicine, Total joint replacement

  5. Hormone replacement therapy and risk of glioma

    DEFF Research Database (Denmark)

    Andersen, Lene; Friis, Søren; Hallas, Jesper

    2013-01-01

    Aim: Several studies indicate that use of hormone replacement therapy (HRT) is associated with an increased risk of intracranial meningioma, while associations between HRT use and risk of other brain tumors have been less explored. We investigated the influence of HRT use on the risk of glioma...

  6. Antibiotic Dosing in Continuous Renal Replacement Therapy.

    Science.gov (United States)

    Shaw, Alexander R; Mueller, Bruce A

    2017-07-01

    Appropriate antibiotic dosing is critical to improve outcomes in critically ill patients with sepsis. The addition of continuous renal replacement therapy makes achieving appropriate antibiotic dosing more difficult. The lack of continuous renal replacement therapy standardization results in treatment variability between patients and may influence whether appropriate antibiotic exposure is achieved. The aim of this study was to determine if continuous renal replacement therapy effluent flow rate impacts attaining appropriate antibiotic concentrations when conventional continuous renal replacement therapy antibiotic doses were used. This study used Monte Carlo simulations to evaluate the effect of effluent flow rate variance on pharmacodynamic target attainment for cefepime, ceftazidime, levofloxacin, meropenem, piperacillin, and tazobactam. Published demographic and pharmacokinetic parameters for each antibiotic were used to develop a pharmacokinetic model. Monte Carlo simulations of 5000 patients were evaluated for each antibiotic dosing regimen at the extremes of Kidney Disease: Improving Global Outcomes guidelines recommended effluent flow rates (20 and 35 mL/kg/h). The probability of target attainment was calculated using antibiotic-specific pharmacodynamic targets assessed over the first 72 hours of therapy. Most conventional published antibiotic dosing recommendations, except for levofloxacin, reach acceptable probability of target attainment rates when effluent rates of 20 or 35 mL/kg/h are used. Copyright © 2017 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  7. Joint Replacement (Finger and Wrist Joints)

    Science.gov (United States)

    ... All Topics A-Z Videos Infographics Symptom Picker Anatomy Bones Joints Muscles Nerves Vessels Tendons About Hand Surgery What is a Hand Surgeon? What is a Hand Therapist? Media Find a Hand Surgeon Home Anatomy Joint Replacement Email to a friend * required fields ...

  8. Performance Evaluation of Vinyl Replacement Windows.

    Science.gov (United States)

    1980-07-15

    SURVEY The literature survey was conducted by Ms. Suzanne D. A. Graham who is on the Corporate Information Center staff at the Johns-Manville Reserach ...Doors, Consumer Guide, 1978. Energy Usage Characteristics of Single Family Residences and Their Occupants in Illinois, Volume I: Methodology , A. C...N. J.; Johnson, T. E., Design Methodologies for Energy Conservation and Passive Heating of Buildings Utilizing Improved Building Components, Progress

  9. Steam generator replacement in Bruce A Unit 1 and Unit 2

    International Nuclear Information System (INIS)

    Hart, R.S.

    2006-01-01

    The Bruce A Generating Station consists of four 900 MW class CANDU units. The reactor and Primary Heat Transport System for each Unit are housed within a reinforced concrete reactor vault. A large duct running below the reactor vaults accommodates the shared fuel handling system, and connects the four reactor vaults to the vacuum building. The reactor vaults, fuelling system duct and the vacuum building constitute the station vacuum containment system. Bruce A Unit 2 was shut down in 1995 and Bruce A Units 1, 3 and 4 were shutdown in 1997. Bruce A Units 3 and 4 were returned to service in late 2003 and are currently operating. Units 1 and 2 remain out of service. Bruce Power is currently undertaking a major rehabilitation of Bruce A Unit 1 and Units 2 that will extend the in-service life of these units by at least 25 years. Replacement of the Steam Generators (eight in each unit) is required; this work was awarded to SNC-Lavalin Nuclear (SLN). The existing steam drums (which house the steam separation and drying equipment) will be retained. Unit 2 is scheduled to be synchronized with the grid in 2009, followed by Unit 1 in 2009. Each Bruce A unit has two steam generating assemblies, one located above and to each end of the reactor. Each steam generating assembly consists of a horizontal cylindrical steam drum and four vertical Steam Generators. The vertical Steam Generators connect to individual nozzles that are located on the underside of the Steam Drum (SD). The steam drums are located in concrete shielding structures (steam drum enclosures). The lower sections of the Steam Generators penetrate the top of the reactor vaults: the containment pressure boundary is established by bellows assemblies that connect between the reactor vault roof slab and the Steam Generators. Each Steam Generators is supported from the bottom by a trapeze that is suspended from the reactor vault top structure. The Steam Generator Replacement (SGR) methodology developed by SLN for Unit 1

  10. Residential and commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Svendsen, Svend; Furbo, S.

    2012-11-15

    Low-energy buildings can make a major contribution to general sustainable development by providing a solution to problems related to the use of fossil fuels. The EPBD (EU Directive on Energy Performance of Buildings) requirements that by 2020 new building shall be constructed to use nearly zero energy, and no fossil fuels, can be accomplished by combining low-energy buildings with renewable energy via low-temperature district heating in cities and suburbs, and via heat pumps for low-density settlements. Based on experience with passive houses, low-energy buildings meeting the energy performance requirements of 2020 are expected to cost only a few percent more than conventional buildings. The very large and rapid changes needed in the energy performance of buildings is a challenge for the building sector, but one that can be overcome by better methods of developing products and designing, constructing and operating buildings. Simulation-based analysis and optimisation, and considerations of durability, will be important here. Building may thus be transformed from an experience-based sector to one based on knowledge and research, with high-quality sustainable products and good business opportunities. (Author)

  11. Steam generator replacement from ALARA aspects

    International Nuclear Information System (INIS)

    Terry, I.; Breznik, B.

    2003-01-01

    This paper is going to consider radiological related parameters important for steam generator replacement (SGR) implementation. These parameters are identified as ALARA related parameters, owner-contractor relationship, planning, health physics with logistic services, and time required for the replacement. ALARA related parameters such as source or initial dose rate and plant system configuration define the initial conditions for the planning. There is room to optimise work planning. managerial procedures and also the staff during the implementation phase. The overview of these general considerations is based on the following background: using internationally available data and the experience of one of the vendors, i.e. Siemens-Framatome, and management experience of SG replacement which took place at Krsko NPP in the spring of 2000. Generally plant decisions on maintenance or repair procedures under radiation conditions take into account ALARA considerations. But in the main it is difficult to adjudge the results of an ALARA study, usually in the form of a collective dose estimate, because a comparison standard is missing. That is, very often the planned work is of a one-off nature so comparisons are not possible or the scopes are not the same. In such a case the collective doses for other types of work are looked at and a qualitative evaluation is made. In the case of steam generator replacement this is not the case. Over years of steam generator replacements world-wide a standard has been developed gradually. The first part of the following displays an overview of SGR and sets the Krsko SGR in perspective by applying dose analysis. The second part concentrates on the Krsko SGR itself and its ALARA aspects. (authors)

  12. The nature of the beast: examining climate adaptation options in forests with stand-replacing fire regimes

    Science.gov (United States)

    Joshua S. Halofsky; Daniel C. Donato; Jerry F. Franklin; Jessica E. Halofsky; David L. Peterson; Brian J. Harvey

    2018-01-01

    Building resilience to natural disturbances is a key to managing forests for adaptation to climate change. To date, most climate adaptation guidance has focused on recommendations for frequent-fire forests, leaving few published guidelines for forests that naturally experience infrequent, stand-replacing wildfires. Because most such forests are inherently resilient to...

  13. Influence of Total Knee Arthroplasty on Gait Mechanics of the Replaced and Non-Replaced Limb During Stair Negotiation.

    Science.gov (United States)

    Standifird, Tyler W; Saxton, Arnold M; Coe, Dawn P; Cates, Harold E; Reinbolt, Jeffrey A; Zhang, Songning

    2016-01-01

    This study compared biomechanics during stair ascent in replaced and non-replaced limbs of total knee arthroplasty (TKA) patients with control limbs of healthy participants. Thirteen TKA patients and fifteen controls performed stair ascent. Replaced and non-replaced knees of TKA patients were less flexed at contact compared to controls. The loading response peak knee extension moment was greater in control and non-replaced knees compared with replaced. The push-off peak knee abduction moment was elevated in replaced limbs compared to controls. Loading and push-off peak hip abduction moments were greater in replaced limbs compared to controls. The push-off peak hip abduction moment was greater in non-replaced limbs compared to controls. Future rehabilitation protocols should consider the replaced knee and also the non-replaced knee and surrounding joints. Copyright © 2016 Elsevier Inc. All rights reserved.

  14. Green Building Tools for Tribes

    Science.gov (United States)

    Tribal green building tools and funding information to support tribal building code adoption, healthy building, siting, energy efficiency, renewable energy, water conservation, green building materials, recycling and adaptation and resilience.

  15. 49 CFR 541.6 - Requirements for replacement parts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Requirements for replacement parts. 541.6 Section....6 Requirements for replacement parts. (a) Each replacement part for a part specified in § 541.5(a) must have the registered trademark of the manufacturer of the replacement part, or some other unique...

  16. 30 CFR 800.30 - Replacement of bonds.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Replacement of bonds. 800.30 Section 800.30... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.30 Replacement... replacement performance bonds. Replacement of a performance bond pursuant to this section shall not constitute...

  17. 31 CFR 361.8 - Claim for replacement.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Claim for replacement. 361.8 Section... § 361.8 Claim for replacement. Claim for replacement shall be made in writing to the Secretary, to the..., Parkersburg, WV 26106-1328. The claim, accompanied by a recommendation regarding the manner of replacement...

  18. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  19. Age replacement models: A summary with new perspectives and methods

    International Nuclear Information System (INIS)

    Zhao, Xufeng; Al-Khalifa, Khalifa N.; Magid Hamouda, Abdel; Nakagawa, Toshio

    2017-01-01

    Age replacement models are fundamental to maintenance theory. This paper summarizes our new perspectives and hods in age replacement models: First, we optimize the expected cost rate for a required availability level and vice versa. Second, an asymptotic model with simple calculation is proposed by using the cumulative hazard function skillfully. Third, we challenge the established theory such that preventive replacement should be non-random and only corrective replacement should be made for the unit with exponential failure. Fourth, three replacement policies with random working cycles are discussed, which are called overtime replacement, replacement first, and replacement last, respectively. Fifth, the policies of replacement first and last are formulated with general models. Sixth, age replacement is modified for the situation when the economical life cycle of the unit is a random variable with probability distribution. Finally, models of a parallel system with constant and random number of units are taken into considerations. The models of expected cost rates are obtained and optimal replacement times to minimize them are discussed analytically and computed numerically. Further studies and potential applications are also indicated at the end of discussions of the above models. - Highlights: • Optimization of cost rate for availability level is discussed and vice versa. • Asymptotic and random replacement models are discussed. • Overtime replacement, replacement first and replacement last are surveyed. • Replacement policy with random life cycle is given. • A parallel system with random number of units is modeled.

  20. Net positive energy buildings

    International Nuclear Information System (INIS)

    Romero, A.; Barreiro, E.; Sanchez Zabala, V.

    2010-01-01

    Buildings are great consumers of energy, being responsible for almost 36% of CO2 emissions in Europe. Though there are many initiatives towards the reduction of energy consumption and CO2 emissions in buildings, many of the alternatives are diminished due to a lack of a unique and holistic approach to the problem. This paper reports a new innovative concept of Positive Energy Buildings (EB+), as well as an integral methodology that covers the overall design process for achieving them. The methodology evaluates energy efficiency solutions at different scales, from building site to generation systems. An educational building design in Navarra serves as a case study to check the feasibility of the proposed methodology. The study concludes that the key to achieve a Positive Energy Building is a minimized energy demand, complemented by efficient facilities and enhanced by distributed power generation from renewable sources. (Author).

  1. Green buildings pay

    DEFF Research Database (Denmark)

    Naboni, Emanuele; Edwards, Brian

    The new edition of ‘Green Buildings Pay’ authored by Brian Edwards and Emanuele Naboni explores the business and professional benefits which derive from architectural design driven by sustainability. With a new sub-title ‘Green Buildings Pay: design, productivity and ecology’ the book argues...... that environmental design has altered how we design, construct and manage buildings. The book has relevance to those who not only design and engineer buildings but to those who commission architecture and those who occupy the products of this process. Hence, the user is a key consideration. The book examines via...... a number of LEED and BREEAM cases the buildings which flow from corporate environmental responsibility. A number of office and university buildings are examined from three main perspectives- the architect, client and user. One key finding is that architectural innovation has been driven by ecological...

  2. Building materials. Stichwort Baustoff

    Energy Technology Data Exchange (ETDEWEB)

    Rohwer, W

    1981-01-01

    To handle building materials properly, one must know about their characteristics. This pocket book will be of help: structured like a glossary, it gives brief descriptions of the most common building materials. It is small and handy enough to be a constant companion to resident engineers, foremen, gangers, building tradesmen, and construction workers and an aid in their training. The following groups of building materials are discussed: Natural stone; units for brick walls, floors, and roofs; mortar and concrete (definitions, binders, aggregates, additives, admixtures, mixing water); special types of plaster and rendering; light-weight building boards and wood wool basis; multilayer light-weight building boards; gypsum plasterboards; chimney construction; sewers; thermal insulation and sound section; structural steels; plastics.

  3. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    International Nuclear Information System (INIS)

    DiCello, D.C.; Odell, A.D.; Jackson, T.J.

    1995-01-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific (μCi/cm 2 ) of Co-60 and Zn-65 were analyzed

  4. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    Energy Technology Data Exchange (ETDEWEB)

    DiCello, D.C.; Odell, A.D.; Jackson, T.J. [PECO Energy Co., Delta, PA (United States)

    1995-03-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished, and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific ({mu}Ci/cm{sup 2}) of Co-60 and Zn-65 were analyzed.

  5. Trends in building materials

    CSIR Research Space (South Africa)

    Mapiravana, Joseph

    2012-07-01

    Full Text Available , steel and composites research. Analysis of the building materials market situation in South Africa identified the major building material cost drivers as cement and concrete and steel. For South Africa, research and development focus has been... in South Africa be cement and concrete, light-weight steel construction, smart tiles and composite materials. Nanotechnology materials should be used for property enhancement. The building materials developed should be modularised and/or panelised...

  6. Radon in buildings

    International Nuclear Information System (INIS)

    Connell, J.J.

    1991-01-01

    This guide is intended to inform designers, householders and other building owners about the radon problem and to help in deciding if there is need to take any action to reduce radon levels in their homes or other buildings.It explains what radon is, how it enters buildings and what effect it may have on health. Reference is made to some of the usual ways of reducing the level of radon and guidance is given on some sources of assistance

  7. Radon in buildings

    International Nuclear Information System (INIS)

    Ryan, N.M.; Finn, M.

    1995-01-01

    This guide is intended to inform designers, contractors, householders and other building owners about radon in buildings and to provide guidance where it has been decided to take action to reduce radon levels. It gives some pointers to good practice insofar as it relates to non complex buildings of normal design and construction. Reference is made to the usual ways of reducing l;levels of radon and guidance is given on sources of further information. I

  8. Development of Ecological Buildings

    Directory of Open Access Journals (Sweden)

    Andrius Keizikas

    2011-04-01

    Full Text Available The article presents research on ecological buildings and their influence on the constructional sphere. The aim of the paper is to reveal the essence of ecological architecture showing substantial progress and its potential to stimulate architectural and technological growth. The article also describes relations between the ideas of ecological buildings and the ‘passive house’ concepts and aspects of development as well as describes the possibilities of improving building sustainability and energy efficiency. Article in Lithuanian

  9. Healthy Buildings '88

    International Nuclear Information System (INIS)

    Berglund, B.; Lindvall, T.; Maansson, L.G.

    1988-06-01

    The Healthy Buildings '88 Conference focuses on the technical solutions and functional requirements contributing to Healthy Buildings for people to live and work in. The main object of the Conference is to give architects, consultants, real-estate owners and manufacturers of building materials recommendations on choice of materials and choice of systems and on how to combine materials and systems. The program includes overview lectures, plenary symposia with invited speakers, workshops, poster presentations and an exhibition of scientific, educational and technical material. One part of the conference is devoted to the problem of radon in residential buildings

  10. Radon in large buildings

    International Nuclear Information System (INIS)

    Wilson, D.L.; Dudney, C.S.; Gammage, R.B.

    1993-01-01

    Over the past several years, considerable research has been devoted by the U.S. Environmental Protection Agency (USEPA) and others to develop radon sampling protocols for single family residences and schools. However, very little research has been performed on measuring radon in the work place. To evaluate possible sampling protocols, 833 buildings throughout the United States were selected for extensive radon testing. The buildings tested (warehouses, production plants and office buildings) were representative of commercial buildings across the country both in design, size and use. Based on the results, preliminary radon sampling protocols for the work place have been developed. (orig.). (5 refs., 3 figs.)

  11. Net Zero Energy Buildings

    DEFF Research Database (Denmark)

    Marszal, Anna Joanna; Bourrelle, Julien S.; Gustavsen, Arild

    2010-01-01

    and identify possible renewable energy supply options which may be considered in calculations. Finally, the gap between the methodology proposed by each organisation and their respective national building code is assessed; providing an overview of the possible changes building codes will need to undergo......The international cooperation project IEA SHC Task 40 / ECBCS Annex 52 “Towards Net Zero Energy Solar Buildings”, attempts to develop a common understanding and to set up the basis for an international definition framework of Net Zero Energy Buildings (Net ZEBs). The understanding of such buildings...

  12. Sick building syndrome

    Directory of Open Access Journals (Sweden)

    Tjandra Y. Aditama

    2002-06-01

    Full Text Available Sick building syndrome describes a number of mostly unspesific complaints of some occupants of the building. The exact pathophysiological mechanism remains elusive. It is a multi factorial event which may include physical, chemical, biological as well as psycological factors. In many cases it is due to insufficient maintenance of the HVAC (heating, ventilation, air conditioning system in the building. Sign and symptoms can be uncomfortable and even disabling, which may include mucus membrane irritation, neurotoxic symptoms, asthma like symptoms, skin complaints, gastrointestinal symptoms and other related symptoms. There are various investigation methods to diagnose sick building syndrome, and on site assessment of the building is extremely useful. Prevention through a proactive air quality monitoring program is far more desirable than dealing with an actual sick building. Indoor air and the sick building symdrome serves as a paradigm of modern occupational and environmental medicine. (Med J Indones 2002; 11:124-31Keywords: indoor air pollution, sick building syndrome, building related illness

  13. Building valve amplifiers

    CERN Document Server

    Jones, Morgan

    2013-01-01

    Building Valve Amplifiers is a unique hands-on guide for anyone working with tube audio equipment--as an electronics hobbyist, audiophile or audio engineer. This 2nd Edition builds on the success of the first with technology and technique revisions throughout and, significantly, a major new self-build project, worked through step-by-step, which puts into practice the principles and techniques introduced throughout the book. Particular attention has been paid to answering questions commonly asked by newcomers to the world of the valve, whether audio enthusiasts tackling their first build or

  14. Facade renovation - replacement and restoration of the panels in a monument protected object

    Science.gov (United States)

    Novotný, Michal

    2017-12-01

    The article deals with problems of reconstruction of the facade and the associated problem of replacement or repair of the panels. In conventional buildings it is a smooth operation, but it is problematic in monument-protected objects. In the case of a common building, it is possible to choose any modern panels and simply replace them, but for historical objects we have to follow the claims and the rules of monument protection. In practice, it usually means the impossibility of use of modern panels, but at least a combination of old and modern technologies. Another possible solution to the problem is renovation, or repairs to the original state of the existing panels, of course with respect to the functionality of such panels. The implementation of such repairs must always be based on the technical and historical survey of the condition of the object and the repairs must be professionally designed. Subsequently, corrections are made, during which it is necessary to pay particular attention to observance of the technological procedures, rules and instructions particularly in terms of monument protection. However, the functionality of the works or elements made with regard to the quality of the environment within the building is not negligible. A common problem is the lack of control of technical requirements and functional requirements. Underestimation of the problems then leads to difficult repairs. The article points to the mistakes and problems of one such construction project on a historically protected chateau building.

  15. Environmental Assessment: Replace Sanitary Sewer from Building 801 to Lagoons at Grand Forks AFB, North Dakota

    Science.gov (United States)

    2010-09-01

    emergent marsh (PEM) wetlands are characterized by erect, rooted , herbaceous hydrophytes, excluding mosses and lichens. This vegetation is present...species), chokecherry and wood rose (Rosa woodsii) are common in the under story in this area. Wood nettle (Laportea canadensis), stinging nettle ...minimized. In areas where excavation is not proposed but vegetation removal is necessary, vegetation should be cut at the ground level, leaving roots

  16. The health implications of replacing common building materials with natural fibre reinforced composites

    CSIR Research Space (South Africa)

    Ampofo-Anti, N

    2015-12-01

    Full Text Available cultivated in South Africa on a commercial or trail basis. The investigation was limited to the synthetic pesticides that are approved for use in South Africa. A toxicity profile was developed for each natural fibre on the basis of the chronic health effects...

  17. Final Environmental Assessment: Replacement Joint Force Headquarters Building, Hanscom Air Force Base Massachusetts

    Science.gov (United States)

    2010-01-22

    Review Assistant, at (508) 389-6361. Sincerely, ~J.J Thomas W. French , Ph.D. Assistant Director Division ofFisheries and Wildlife www. masswildl{(e...doors or COA Cinema Friday. Dec.18. 1 been given the opportunity to windows. The COA would like p.m. Come and relax with a purchase tickets for the...Chang. clarinet. grade ll edo Chang. trombone. e10 1el Davidow. French hom. ell stey. French hom. grade es Gorry. flute. grade 12 Andrew Goulet

  18. Environmental Assessment (EA) for Replacement of the Wastewater Lift Station (Building 510)

    Science.gov (United States)

    2013-04-13

    ensure that wastewater from FEW continues to be safely and efficiently moved to the City of Cheyenne sanitary sewer system. The lift station is...from four to six inches. The subsoil is primarily alluvial clay that extends from a depth of approximately 6 to 36 inches. 8.4. Air Quality. Under...Disposal 8.6.1. Sanitary Sewer System A National Pollutant Discharge Elimination System (NPDES) permit issued by the WYDEQ is in place to allow discharge

  19. Final Environmental Assessment (EA) for Replacement of the Wastewater Lift Station (Building 510)

    Science.gov (United States)

    2013-03-01

    ensure that wastewater from FEW continues to be safely and efficiently moved to the City of Cheyenne sanitary sewer system. The lift station is...from four to six inches. The subsoil is primarily alluvial clay that extends from a depth of approximately 6 to 36 inches. 8.4. Air Quality. Under...Disposal 8.6.1. Sanitary Sewer System A National Pollutant Discharge Elimination System (NPDES) permit issued by the WYDEQ is in place to allow discharge

  20. Estimating the shear strength of concrete with coarse aggregate replacement

    OpenAIRE

    Folagbade Olusoga Peter ORIOLA; George MOSES; Jacob Oyeniyi AFOLAYAN; John Engbonye SANI

    2017-01-01

    For economic, environmental and practical reasons, it is desirable to replace the constituents of concrete with wastes and cheaper alternative materials. However, it is best when such replacements are done at optimum replacement levels. In view of this, a laboratory investigative test was carried out to evaluate the shear strength of concrete with coarse aggregate replacement by Coconut Shell and by Waste Rubber Tyre. The coarse aggregate replacement was done at recommended optimum proportion...

  1. Replacement of heavy components of the Main Primary System (MPS). Recent innovations made by Framatome ANP

    International Nuclear Information System (INIS)

    Chanussot, J.M.; Thevenet, R.

    2006-01-01

    The replacement of heavy components is the result of widespread stress corrosion of Inconel 600 (and alloys 82/182) in the primary system. Following the corrosion of steam generator tubes, which led to the first steam generator replacement (SGR) operations, work has begun on reactor vessel head replacements (RVHR) and pressurizer replacements, pending treatment of the dissimilar butt welds (DBW). The replacement of sections of the Main Primary System is one way of optimizing plant lifetime besides preventing stress corrosion in primary components and combating phenomena as thermal fatigue or certain metallurgical weaknesses. The increase in the number of major operations carried out in the reactor building on PWR and BWR reactor geometries has called for major technical innovations. AREVA, has over the past twenty years carried out more than forty SGRs throughout the world, including the supply of 115 steam generators of all types. This equates to over 60% of all SGR operations performed in Europe and the USA. Today, most SGR operations are performed in the USA, though some still continue in Europe and Asia. Operations have been planned until 2015. The first RVHR operations were carried out in France in 1993, and have been widespread in Europe since 1996 (Spain and Belgium), and in the USA since 2002 (Davis Besse). Since 1993 AREVA, through its subsidiaries Framatome ANP, Jeumont SA and SGT, has performed 72 RVHRs, i.e. most of those carried out in Europe and the USA. Today, RVHR operations take place throughout the world and have been planned until 2014. The first pressurizer replacement took place in the fall of 2005 in Saint Lucie, USA. Others are to follow (Fort Calhoun, Millestone). A significant number of partial or complete pressurizer replacements are now being scheduled. Special focus must be given to this new operation, as a decision is required between the following types of replacements, taking into account the number of pressurizer heaters and the

  2. Effects of replacing lactose from milk replacer by glucose, fructose, or glycerol on energy partitioning in veal calves

    NARCIS (Netherlands)

    Gilbert, M. S.; Pantophlet, A. J.; van den Borne, J. J. G. C.; Hendriks, W. H.; Schols, H. A.; Gerrits, W. J. J.

    Calf milk replacers contain 40 to 50% lactose. Fluctuating dairy prices are a major economic incentive to replace lactose from milk replacers by alternative energy sources. Our objective was, therefore, to determine the effects of replacement of lactose with glucose, fructose, or glycerol on energy

  3. The new library building at the University of Texas Health Science Center at San Antonio.

    Science.gov (United States)

    Kronick, D A; Bowden, V M; Olivier, E R

    1985-04-01

    The new University of Texas Health Science Center at San Antonio Library opened in June 1983, replacing the 1968 library building. Planning a new library building provides an opportunity for the staff to rethink their philosophy of service. Of paramount concern and importance is the need to convey this philosophy to the architects. This paper describes the planning process and the building's external features, interior layouts, and accommodations for technology. Details of the move to the building are considered and various aspects of the building are reviewed.

  4. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  5. Reliability tests for reactor internals replacement technology

    International Nuclear Information System (INIS)

    Fujimaki, K.; Uchiyama, J.; Ohtsubo, T.

    2000-01-01

    Structural damage due to aging degradation of LWR reactor internals has been reported in several nuclear plants. NUPEC has started a project to test the reliability of the technology for replacing reactor internals, which was directed at preventive maintenance before damage and repair after damage for the aging degradation. The project has been funded by the Ministry of International Trade and Industry (MITI) of Japan since 1995, and it follows the policy of a report that the MITI has formally issued in April 1996 summarizing the countermeasures to be considered for aging nuclear plants and equipment. This paper gives an outline of the whole test plans and the test results for the BWR reactor internals replacement methods; core shroud, ICM housing, and CRD Housing and stub tube. The test results have shown that the methods were reliable and the structural integrity was appropriate based on the evaluation. (author)

  6. Autogenous Transplantation for Replacing a Hopeless Tooth.

    Science.gov (United States)

    Zakershahrak, Mehrsa; Moshari, Amirabbas; Vatanpour, Mehdi; Khalilak, Zohreh; Jalali Ara, Afsoon

    2017-01-01

    Autogenous tooth transplantation (ATT) is a simple and reasonable choice for replacing the missing teeth when a proper donor tooth is available. This report presents a case of successful ATT of a maxillary right third molar for replacement of mandibular right second molar with a concomitant endodontic-periodontal disease. The mandibular second molar was believed to be hopeless due to a severe damage to coronal tooth structure, inappropriate root canal treatment and apical radiolucency. After extraction of mandibular second molar and maxillary third molar (the donor), the tooth was re-implanted into the extracted socket of second molar site. Root canal therapy was then performed. After 3 years, clinical and radiographic examinations revealed satisfying results, with no signs and symptoms. The patient is asymptomatic and the transplanted tooth is still functional with no signs of marginal periodontal pathosis. Radiographies showed bone regeneration in the site of previous extensive periapical lesion, normal periodontal ligament with no signs of root resorption.

  7. Optimal glucocorticoid replacement in adrenal insufficiency.

    Science.gov (United States)

    Øksnes, Marianne; Ross, Richard; Løvås, Kristian

    2015-01-01

    Adrenal insufficiency (glucocorticoid deficiency) comprises a group of rare diseases, including primary adrenal insufficiency, secondary adrenal insufficiency and congenital adrenal hyperplasia. Lifesaving glucocorticoid therapy was introduced over 60 years ago, but since then a number of advances in treatment have taken place. Specifically, little is known about short- and long-term treatment effects, and morbidity and mortality. Over the past decade, systematic cohort and registry studies have described reduced health-related quality of life, an unfavourable metabolic profile and increased mortality in patients with adrenal insufficiency, which may relate to unphysiological glucocorticoid replacement. This has led to the development of new modes of replacement that aim to mimic normal glucocorticoid physiology. Here, evidence for the inadequacy of conventional glucocorticoid therapy and recent developments in treatment are reviewed, with an emphasis on primary adrenal insufficiency. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. Maintenance or replacement of primary equipments

    International Nuclear Information System (INIS)

    Branchu, J.

    1995-01-01

    The principal materials, such as the primary equipments of a PWR type steam generator, have a finite service life. Framatome, builder of steam generators and maintenance contractor of Electricite de France has developed a methodology for the maintenance or the replacement of primary equipments. The paper describes the methodology followed by Framatome to identify and localize the wear mode and to treat or repair the component. Four failure modes have been considered: crack propagation, rubbing/vibration wear, neutron irradiation and corrosion propagation under permanent stress. A kinetic modelling of wear propagation has been computerized and validated using mechanical tests on Inconel 600 mockups. These analyses have allow to determine the strategy of repair or replacement of vessel heads for each unit. The method is evaluated taking into account the risk assessment, cost, dosimetry, efficiency and time delay involved. (J.S.). 1 fig., 3 photos

  9. Replacement Power Facility site selection report

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Toole, G.L.; Specht, W.L.

    1992-06-01

    The Department of Energy (DOE) has proposed the construction and operation of a Replacement Power Facility (RPF) for supplementing and replacing existing sources of steam and possibly electricity at the Savannah River Site (SRS). DOE is preparing an Environmental Impact Statement (EIS) for this project As part of the impact analysis of the proposed action, the EIS will include a detailed description of the environment where the RPF will be constructed. This description must be specific to the recommended site at SRS, which contains more than 300 square miles of land including streams, lakes, impoundments, wetlands, and upland areas. A formal site-selection process was designed and implemented to identify the preferred RPF site.

  10. Psychosocial determinants of outcomes in knee replacement.

    Science.gov (United States)

    Lopez-Olivo, Maria A; Landon, Glenn C; Siff, Sherwin J; Edelstein, David; Pak, Chong; Kallen, Michael A; Stanley, Melinda; Zhang, Hong; Robinson, Kausha C; Suarez-Almazor, Maria E

    2011-10-01

    To identify potential psychosocial and educational barriers to clinical success following knee replacement. The authors evaluated 241 patients undergoing total knee replacement, preoperatively and 6 months after surgery. Outcomes included the Western Ontario McMaster (WOMAC) scale and the Knee Society rating system (KSRS). Independent variables included: the medical outcome study-social support scale; depression, anxiety and stress scale; brief COPE inventory; health locus of control; arthritis self-efficacy scale and the life orientation test-revised. Multiple regression models evaluated associations of baseline demographic and psychosocial variables with outcomes at 6 months, controlling for body mass index, comorbidities and baseline outcome scores. Patients' mean age was 65 ± 9 years; 65% were women. Most patients improved outcomes after surgery. Several psychosocial variables were associated with outcomes. Regression analyses indicated lower education, less tangible support, depression, less problem-solving coping, more dysfunctional coping, lower internal locus of control were associated with worse WOMAC scores (R(2) contribution of psychosocial variables for pain 0.07; for function, 0.14). Older age, lower education, depression and less problem-solving coping were associated with poorer total KSRS scores (R(2) contribution of psychosocial variables to total KSRS model 0.09). Psychosocial variables as a set contributed from 25% to 74% of total explained variance across the models tested. Patients' level of education, tangible support, depression, problem-solving coping, dysfunctional coping and internal locus of control were associated with pain and functional outcomes after knee replacement. The findings suggest that, in addition to medical management, perioperative psychosocial evaluation and intervention are crucial in enhancing knee replacement outcomes.

  11. Replacement team of mining drilling rigs

    OpenAIRE

    Hamodi, Hussan; Lundberg, Jan

    2014-01-01

    This paper presents a practical model to calculate the optimal replacement time (ORT) of drilling rigs used in underground mining. As a case study, cost data for drilling rig were collected over four years from a Swedish mine. The cost data include acquisition, operating, maintenance and downtime costs when using a redundant rig. A discount rate is used to determine the value of these costs over time. The study develops an optimisation model to identify the ORT of a mining drilling rig which ...

  12. Changing trends in total knee replacement

    OpenAIRE

    Goudie, Ewan; Robinson, Cal; Walmsley, Phil; Brenkel, Ivan

    2017-01-01

    Introduction:  This study evaluates a possible change in the demographics and surgical practice observed in a large cohort of patients undergoing total knee replacement (TKR). Patients and methods:  We performed a retrospective analysis of a prospectively collected data on two groups of consecutive patients undergoing primary TKR. Group one consisted of patients who underwent surgery between 1994 and 1998. Group two consisted of patients who had surgery between 2009 and 2012. Results:  The me...

  13. Maintenance and replacement policies under technological obsolescence

    International Nuclear Information System (INIS)

    Clavareau, Julien; Labeau, Pierre-Etienne

    2009-01-01

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur

  14. Reactor console replacement at Washington State University

    International Nuclear Information System (INIS)

    Lovas, Thomas A.

    1978-01-01

    A replacement reactor console was installed in 1977 at the W.S.U. 1 MW TRIGA-fueled reactor as the final step in an instrumentation upgrade program. The program was begun circa 1972 with the design, construction and installation of various systems and equipment. Major instruments were installed in the existing console and tested in the course of reactor operation. The culmination of the program was the installation of a cubicle designed and constructed to house the updated instrumentation. (author)

  15. Aortic valve replacement during acute rheumatic fever.

    Science.gov (United States)

    Khan, A; Chi, S; Gonzalez-Lavin, L

    1978-07-01

    Emergency aortic valve replacement was performed during an attack of acute rheumatic fever in a 12-year-old black boy. He had an uneventful recovery and has remained asymptomatic 27 months after operation. In the light of this experience and that of others, one might conclude that the decision to operate on these patients should be based on the severity of the haemodynamic derangement rather than on the state of activity in the rheumatic process.

  16. Final Environmental Assessment, Horse Creek Bridge Replacement

    Science.gov (United States)

    2010-10-01

    existing bridge pipes that have failed and replace the failed structure with a new, prefabricated pedestrian bridge within the original bridge footprint...vehicles, nor designed for support of standard passenger vehicle loads. The bridge would be a single prefabricated unit consisting of a steel grate...placed on new concrete abutments built on the existing foundations on the creek banks, and put in place by a crane operating from the vehicle parking

  17. Maintenance and replacement policies under technological obsolescence

    Energy Technology Data Exchange (ETDEWEB)

    Clavareau, Julien [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: jclavare@ulb.ac.be; Labeau, Pierre-Etienne [Service de Metrologie Nucleaire, Universite Libre de Bruxelles, Av. Franklin Roosevelt 50, CP165/84 Bruxelles B-1050 (Belgium)], E-mail: pelabeau@ulb.ac.be

    2009-02-15

    The technological obsolescence of a unit is characterized by the existence of challenger units displaying identical functionalities, but with higher performances. This paper aims to define and model in a realistic way, possible maintenance policies of a system including replacement strategies when one type of challenger unit is available. The comparison of these possible strategies is performed based on a Monte Carlo estimation of the costs they incur.

  18. Flow boiling test of GDP replacement coolants

    International Nuclear Information System (INIS)

    Park, S.H.

    1995-01-01

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C 4 F 10 and C 4 F 8 , were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C 4 F 10 mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C 4 F 10 weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd

  19. Enzyme Replacement Therapy for Fabry Disease

    Directory of Open Access Journals (Sweden)

    Maria Dolores Sanchez-Niño PhD

    2016-11-01

    Full Text Available Fabry disease is a rare X-linked disease caused by the deficiency of α-galactosidase that leads to the accumulation of abnormal glycolipid. Untreated patients develop potentially lethal complications by age 30 to 50 years. Enzyme replacement therapy is the current standard of therapy for Fabry disease. Two formulations of recombinant human α-galactosidase A (agalsidase are available in most markets: agalsidase-α and agalsidase-β, allowing a choice of therapy. However, the US Food and Drug Administration rejected the application for commercialization of agalsidase-α. The main difference between the 2 enzymes is the dose. The label dose for agalsidase-α is 0.2 mg/kg/2 weeks, while the dose for agalsidase-β is 1.0 mg/kg/2 weeks. Recent evidence suggests a dose-dependent effect of enzyme replacement therapy and agalsidase-β is 1.0 mg/kg/2 weeks, which has been shown to reduce the occurrence of hard end points (severe renal and cardiac events, stroke, and death. In addition, patients with Fabry disease who have developed tissue injury should receive coadjuvant tissue protective therapy, together with enzyme replacement therapy, to limit nonspecific progression of the tissue injury. It is likely that in the near future, additional oral drugs become available to treat Fabry disease, such as chaperones or substrate reduction therapy.

  20. Transdermal testosterone replacement therapy in men

    Directory of Open Access Journals (Sweden)

    Ullah MI

    2014-01-01

    Full Text Available M Iftekhar Ullah,1 Daniel M Riche,1,2 Christian A Koch1,31Department of Medicine, University of Mississippi Medical Center, 2Department of Pharmacy Practice, The University of Mississippi, 3GV (Sonny Montgomery VA Medical Center, Jackson, MS, USAAbstract: Androgen deficiency syndrome in men is a frequently diagnosed condition associated with clinical symptoms including fatigue, decreased libido, erectile dysfunction, and metabolic syndrome. Serum testosterone concentrations decline steadily with age. The prevalence of androgen deficiency syndrome in men varies depending on the age group, known and unknown comorbidities, and the respective study group. Reported prevalence rates may be underestimated, as not every man with symptoms of androgen deficiency seeks treatment. Additionally, men reporting symptoms of androgen deficiency may not be correctly diagnosed due to the vagueness of the symptom quality. The treatment of androgen deficiency syndrome or male hypogonadism may sometimes be difficult due to various reasons. There is no consensus as to when to start treating a respective man or with regards to the best treatment option for an individual patient. There is also lack of familiarity with treatment options among general practitioners. The formulations currently available on the market are generally expensive and dose adjustment protocols for each differ. All these factors add to the complexity of testosterone replacement therapy. In this article we will discuss the general indications of transdermal testosterone replacement therapy, available formulations, dosage, application sites, and recommended titration schedule.Keywords: hypogonadism, transdermal, testosterone, sexual function, testosterone replacement therapy, estradiol

  1. [Update in continuous renal replacement techniques].

    Science.gov (United States)

    Romero-García, M; de la Cueva-Ariza, L; Delgado-Hito, P

    2013-01-01

    Acute renal failure affects 25% of patients hospitalized in intensive care units. Despite technological advances, the mortality of these patients is still high due to its associated complications. Continuous renal replacement techniques are one of the treatments for acute renal failure because they make it possible to treat the complications and decrease mortality. The nurse's knowledge and skills regarding these techniques will be decisive for the success of the therapy. Consequently, the nurse's experience and training are key components. The objective of this article is to update the knowledge on continuous renal replacement techniques. Keeping this in mind, a review has been made of the physical and chemical principles such as diffusion and convection, among others. A description of the different continuous renal replacement techniques, a presentation of the main vascular access, and a description of the nursing cares and complications related to techniques used have also been provided. Copyright © 2012 Elsevier España, S.L. y SEEIUC. All rights reserved.

  2. 300 Area steam plant replacement, Hanford Site, Richland, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1997-03-01

    Steam to support process operations and facility heating is currently produced by a centralized oil-fired plant located in the 300 Area and piped to approximately 26 facilities in the 300 Area. This plant was constructed during the 1940s and, because of tis age, is not efficient, requires a relatively large operating and maintenance staff, and is not reliable. The US Department of Energy is proposing an energy conservation measure for a number of buildings in the 300 Area of the Hanford Site. This action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a fuel source for many of these units and constructing a central control building to operate and maintain the system. A new steel-sided building would be constructed in the 300 Area in a previously disturbed area at least 400 m (one-quarter mile) from the Columbia River, or an existing 300 Area building would be modified and used. This Environmental Assessment evaluates alternatives to the proposed actions. Alternatives considered are: (1) the no action alternative; (2) use of alternative fuels, such as low-sulfur diesel oil; (3) construction of a new central steam plant, piping and ancillary systems; (4) upgrade of the existing central steam plant and ancillary systems; and (5) alternative routing of the gas distribution pipeline that is a part of the proposed action. A biological survey and culture resource review and survey were also conducted

  3. Challenge of Replacing Obsolete Equipment and Systems on Brownfield Sites

    International Nuclear Information System (INIS)

    Teasdale, St.

    2009-01-01

    The Nuclear Decommissioning Authority (NDA) is responsible for the decommissioning and clean-up of the UK's civil public sector nuclear sites. One of their top priorities is the retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond (FGMSP) at Sellafield site which is one of the most complex and compact nuclear sites in the world. The FGMSP plant is currently undergoing a series of major modifications in preparation for the retrievals operations. One of the most challenging modifications undertaken in the facility has been the Control and Surveillance Project which covered replacement of the existing Environmental Monitoring System, this presented the complex challenge of replacing an existing system whilst maintaining full functionality on a live radiological safety system with a constant radiological hazard. The Control and Surveillance Project involved the design, procurement, installation, changeover and commissioning of a new Radiological Surveillance System (alpha, beta and gamma monitoring) along with Building Evacuation Systems within the FGMSP complex to replace the existing obsolete system. This Project was a key enabler to future FGMSP retrievals and decommissioning activities. The project objective was to create and maintain a safe radiological working environment for over 450 personnel working in the plant up to 2020. The Legacy Ponds at Sellafield represent one of the biggest challenges in the civil nuclear clean up portfolio in the UK. Retrieval of sludge and fuel from the First Generation Magnox Fuel Storage Pond (FGMSP), and its safe long term storage is one of the NDA's top priorities. In June 2002 Sellafield Ltd contracted with the ACKtiv Nuclear Joint Venture to progress the risk mitigation, asset restoration and the early enabling works associated with preparation for clean up. Since then significant progress has been made in preparing the facility, and it's support systems, for the clean-up operations. This has been

  4. Electromagnetically shielded building

    International Nuclear Information System (INIS)

    Takahashi, T.; Nakamura, M.; Yabana, Y.; Ishikawa, T.; Nagata, K.

    1992-01-01

    This invention relates to a building having an electromagnetic shield structure well-suited for application to an information network system utilizing electromagnetic waves, and more particularly to an electromagnetically shielded building for enhancing the electromagnetic shielding performance of an external wall. 6 figs

  5. Reusing Old Manufacturing Buildings

    Science.gov (United States)

    Roman, Harry T.

    2014-01-01

    This article presents an interesting design challenge for students, one that will certainly let them integrate subject matter and get a sense of pride for doing something useful in their own community. The author would be willing to bet that the average town or city has some old red brick manufacturing building(s) that have seen much better days.…

  6. Building a Data Warehouse.

    Science.gov (United States)

    Levine, Elliott

    2002-01-01

    Describes how to build a data warehouse, using the Schools Interoperability Framework (www.sifinfo.org), that supports data-driven decision making and complies with the Freedom of Information Act. Provides several suggestions for building and maintaining a data warehouse. (PKP)

  7. Electromagnetically shielded building

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, T; Nakamura, M; Yabana, Y; Ishikawa, T; Nagata, K

    1992-04-21

    This invention relates to a building having an electromagnetic shield structure well-suited for application to an information network system utilizing electromagnetic waves, and more particularly to an electromagnetically shielded building for enhancing the electromagnetic shielding performance of an external wall. 6 figs.

  8. Building a Better Robot

    Science.gov (United States)

    Navah, Jan

    2012-01-01

    Kids love to build robots, letting their imaginations run wild with thoughts of what they might look like and what they could be programmed to do. Yet when students use cereal boxes and found objects to make robots, often the projects look too similar and tend to fall apart. This alternative allows students to "build" robots in a different way,…

  9. Building Numbers from Primes

    Science.gov (United States)

    Burkhart, Jerry

    2009-01-01

    Prime numbers are often described as the "building blocks" of natural numbers. This article shows how the author and his students took this idea literally by using prime factorizations to build numbers with blocks. In this activity, students explore many concepts of number theory, including the relationship between greatest common factors and…

  10. Building information modelling (BIM)

    CSIR Research Space (South Africa)

    Conradie, Dirk CU

    2009-02-01

    Full Text Available The concept of a Building Information Model (BIM) also known as a Building Product Model (BPM) is nothing new. A short article on BIM will never cover the entire filed, because it is a particularly complex filed that is recently beginning to receive...

  11. Heat loss from Buildings

    DEFF Research Database (Denmark)

    Karlsson, Kenneth; Næraa, Rikke

    1997-01-01

    Determination of heat loss coefficients for buildings in Denmark. The coefficient are determined for 15 building groups and 3 year intervals. They are based on the BBR-registre and assumptions of U-values(W/K*m2)and computed in a simple spreed sheet model.The results are used in the REVEILLE...

  12. SUSY GUT Model Building

    International Nuclear Information System (INIS)

    Raby, Stuart

    2008-01-01

    In this talk I discuss the evolution of SUSY GUT model building as I see it. Starting with 4 dimensional model building, I then consider orbifold GUTs in 5 dimensions and finally orbifold GUTs embedded into the E 8 xE 8 heterotic string.

  13. Building Maintenance Syllabus.

    Science.gov (United States)

    Fischer, Joseph; Messier, Joseph

    Building maintenance is a basic two-year trade education course requiring 2 1/2 hours of study on each of 160 teaching days per year. Student abilities should range from those capable of the simplest custodial work to those who may eventually be superintendents of building complexes. The syllabus is organized in sections by traditional skills…

  14. Building Global Learning Communities

    Science.gov (United States)

    Cochrane, Thomas; Buchem, Ilona; Camacho, Mar; Cronin, Catherine; Gordon, Averill; Keegan, Helen

    2013-01-01

    Within the background where education is increasingly driven by the economies of scale and research funding, we propose an alternative online open and connected framework (OOC) for building global learning communities using mobile social media. We critique a three year action research case study involving building collaborative global learning…

  15. Coupling Adaptation Tipping Points and Engineering Options: New Insights for Resilient Water Infrastructure Replacement Planning

    Science.gov (United States)

    Smet, K.; de Neufville, R.; van der Vlist, M.

    2017-12-01

    This work presents an innovative approach for replacement planning for aging water infrastructure given uncertain future conditions. We draw upon two existing methodologies to develop an integrated long-term replacement planning framework. We first expand the concept of Adaptation Tipping Points to generate long-term planning timelines that incorporate drivers of investment related to both internal structural processes as well as changes in external operating conditions. Then, we use Engineering Options to explore different actions taken at key moments in this timeline. Contrasting to the traditionally more static approach to infrastructure design, designing the next generation of infrastructure so it can be changed incrementally is a promising method to safeguard current investments given future uncertainty. This up-front inclusion of structural options in the system actively facilitates future adaptation, transforming uncertainty management in infrastructure planning from reactive to more proactive. A two-part model underpins this approach. A simulation model generates diverse future conditions, allowing development of timelines of intervention moments in the structure's life. This feeds into an economic model, evaluating the lifetime performance of different replacement strategies, making explicit the value of different designs and their flexibility. A proof of concept study demonstrates this approach for a pumping station. The strategic planning timelines for this structure demonstrate that moments when capital interventions become necessary due to reduced functionality from structural degradation or changed operating conditions are widely spread over the structure's life. The disparate timing of these necessary interventions supports an incremental, adaptive mindset when considering end-of-life and replacement decisions. The analysis then explores different replacement decisions, varying the size and specific options included in the proposed new structure

  16. Soil Overconsolidation Changes Caused by Dynamic Replacement

    Science.gov (United States)

    Piotr, Kanty; Sławomir, Kwiecień; Jerzy, Sękowski

    2017-10-01

    In the dynamic replacement method (DR) the soil is improved by initially dropping a large weight (typically 8-20 t) pounder from a significant height up to 25 m. The created crater is filled with a stronger material (gravel, rubble, stone aggregate, debris), and the pounder is dropped once or multiple times again. The construction of dynamic replacement pillars influences the parameters of the adjacent soil. It results from the energy generated by dropping a pounder into the soil. In the current practice, these changes are not taken into the account during the design. This paper focuses on the changes of overconsolidation ratio (OCR) and in situ coefficient of lateral earth pressure (K) values estimated base on cone penetration test (CPTU) and Dilatometric test (DMT) performed at a test site. A single column was constructed and the ground around the column was examined using CPTU and DMT, performed at different distances from the column centre (2, 3, 4 and 6 m) and at different time intervals (during construction and 1, 8, 30 days later). The column was constructed in so-called transition soils (between cohesive and non-cohesive). While interpreting the results of the research, the authors addressed the matter of choosing the procedure of OCR and K indication for transition soils (in this case described as silts and/or sandy silts). Overconsolidation changes may differ depending on the chosen analysis procedure (for cohesive or non-cohesive soils). On the basis of the analysis presented in the paper and the observation of soil (acknowledged as cohesive according to macroscopic observations) during column excavation, it was decided that for more detailed analyses methods dedicated to cohesive soils should be applied. Generally, it can be stated that although the changes were complex, DR pillar formation process resulted in the increase of these parameters. The average increases of OCR and K values were 25% and 10% respectively. The post installation values are not

  17. Extended replacement of the thoracic aorta.

    Science.gov (United States)

    Hino, Yutaka; Okada, Kenji; Oka, Takanori; Inoue, Takeshi; Tanaka, Akiko; Omura, Atsushi; Kano, Hiroya; Okita, Yutaka

    2013-01-01

    We present our experience of total aortic arch replacement. Twenty-nine patients (21 males and 8 females; mean age 63.3 ± 13.3 years) with extended thoracic aortic aneurysms underwent graft replacement. The pathology of the diseased aorta was non-dissecting aneurysm in 11 patients, including one aortitis and aortic dissection in 18 patients (acute type A: one, chronic type A: 11, chronic type B: six). Five patients had Marfan syndrome. In their previous operation, two patients had undergone the Bentall procedure, three had endovascular stenting, one had aortic root replacement with valve sparing and 12 had hemi-arch replacement for acute type A dissection. Approaches to the aneurysm were as follows: posterolateral thoracotomy with rib-cross incision in 16, posterolateral thoracotomy extended to the retroperitoneal abdominal aorta in seven, mid-sternotomy and left pleurotomy in three, anterolateral thoracotomy with partial lower sternotomy in two and clam-shell incision in one patient. Extension of aortic replacement was performed from the aortic root to the descending aorta in 4, from the ascending aorta to the descending aorta in 17 and from the ascending to the abdominal aorta in eight patients. Arterial inflow for cardiopulmonary bypass consisted of the femoral artery in 15 patients, ascending aorta and femoral artery in seven, descending or abdominal aorta in five and ascending aorta in two. Venous drainage site was the femoral vein in 10, pulmonary artery in eight, right atrium in five, femoral artery with right atrium/pulmonary artery in four and pulmonary artery with right atrium in two patients. The operative mortality, 30-day mortality and hospital mortality was one (cardiac arrest due to aneurysm rupture), one (rupture of infected aneurysm) and one (brain contusion), respectively. Late mortality occurred in three patients due to pneumonia, ruptured residual aneurysm and intracranial bleeding. Actuarial survival at 5 years after the operations was 80.6

  18. Future Green Buildings

    DEFF Research Database (Denmark)

    Mathiesen, Brian Vad; Drysdale, David; Lund, Henrik

    an energy system integration perspective, heat savings, electricity savings, and user behavioural aspects as well as energy storage and household level flexibility. Many reports on green or sustainable buildings focus only on savings levels and disregard the cost of renewable energy production. Some reports......Efficient buildings are essential for an affordable Danish energy supply in 2050. The purpose of this report is to describe the contribution and role of the building sector in a 100% renewable energy future, as well as the transitions that are necessary in the building sector to support this change....... The report builds on a literature review encompassing more than 50 reports and research papers over the last 10 years and more than a two decades knowledge about the interactions between different components of the energy sector. The review has been focused on aspects such as cost-effective solutions from...

  19. Building perservation practice

    DEFF Research Database (Denmark)

    Pilegaard, Marie Kirstine

    , and they indicate the importance of this story to be preserved. The professionals, who cooperate on the preservation efforts for the cultural environments today, all emphasizes the communication of the story, but using different approaches towards the processes of reading, interpreting and communicating. The role...... planning? In this paper I will focus on the communication of the architects working with building preservation and planning, how they communicate the building, the interventions and the storytelling in practice. The methods used by the architects are based on a practice, where some skills are learned...... through education, such as documentation of buildings and the restoration as a way of communicating the architect's intervention on the building, meanwhile the communication of the buildings history is seen as a "natural" skill and the methods are not questioned in the practice. The storytelling has today...

  20. CERN's newest building

    CERN Multimedia

    Anaïs Vernède

    2011-01-01

    With a growing number of users looking for offices, the shortage of space has become acute, particularly for physicists. Building 42, inaugurated on Friday 11 February, offers almost 300 new work-spaces and a particularly pleasant working environment.   Mauro Dell’Ambrogio, the Swiss State Secretary for Education and Research (left), Rolf Heuer , CERN Director-General (centre), and Mark Muller, President of the Government of the Republic and Canton of Geneva and Head of the Department of Construction and Information Technology (right) at the opening of Building 42 on 11 February, 2011.   Construction work for the new Building 42 began in January 2009, thanks to support from the Swiss foundation FIPOI (Fondation des immeubles pour les organisations internationales). After two years of work, the building, an extension of Building 40, is ready to accommodate physicists from around the world who have come to work on the LHC. "We had more than 25 external contractors working...

  1. Renewable Substitutability Index: Maximizing Renewable Resource Use in Buildings

    Directory of Open Access Journals (Sweden)

    Ravi S. Srinivasan

    2015-05-01

    Full Text Available In order to achieve a material and energy balance in buildings that is sustainable in the long run, there is an urgent need to assess the renewable and non-renewable resources used in the manufacturing process and to progressively replace non-renewable resources with renewables. Such progressive disinvestment in the non-renewable resources that may be substituted with renewable resources is referred to as “Renewable Substitutability” and if implemented, this process will lead to a paradigm shift in the way building materials are manufactured. This paper discusses the development of a Renewable Substitutability Index (RSI that is designed to maximize the use of renewable resources in a building and quantifies the substitution process using solar emergy (i.e., the solar equivalent joules required for any item. The RSI of a building or a building component, i.e., floor or wall systems, etc., is the ratio of the renewable resources used during construction, including replacement and maintenance, to the building’s maximum renewable emergy potential. RSI values range between 0 and 1.0. A higher RSI achieves a low-energy building strategy promoting a higher order of sustainability by optimizing the use of renewables over a building’s lifetime from formation-extraction-manufacturing to maintenance, operation, demolition, and recycle.

  2. Building the green way.

    Science.gov (United States)

    Lockwood, Charles

    2006-06-01

    Just five or six years ago, the term "green building" evoked visions of barefoot, tie-dyed, granola-munching denizens. There's been a large shift in perception. Of course, green buildings are still known for conserving natural resources by, for example, minimizing on-site grading, using alternative materials, and recycling construction waste. But people now see the financial advantages as well. Well-designed green buildings yield lower utility costs, greater employee productivity, less absenteeism, and stronger attraction and retention of workers than standard buildings do. Green materials, mechanical systems, and furnishings have become more widely available and considerably less expensive than they used to be-often cheaper than their standard counterparts. So building green is no longer a pricey experiment; just about any company can do it on a standard budget by following the ten rules outlined by the author. Reliable building-rating systems like the U.S. Green Building Council's rigorous Leadership in Energy and Environmental Design (LEED) program have done much to underscore the benefits of green construction. LEED evaluates buildings and awards points in several areas, such as water efficiency and indoor environmental quality. Other rating programs include the UK's BREEAM (Building Research Establishment's Environmental Assessment Method) and Australia's Green Star. Green construction is not simply getting more respect; it is rapidly becoming a necessity as corporations push it fully into the mainstream over the next five to ten years. In fact, the author says, the owners of standard buildings face massive obsolescence. To avoid this problem, they should carry out green renovations. Corporations no longer have an excuse for eschewing environmental and economic sustainability. They have at their disposal tools proven to lower overhead costs, improve productivity, and strengthen the bottom line.

  3. Automatic generation and simulation of urban building energy models based on city datasets for city-scale building retrofit analysis

    International Nuclear Information System (INIS)

    Chen, Yixing; Hong, Tianzhen; Piette, Mary Ann

    2017-01-01

    Highlights: •Developed methods and used data models to integrate city’s public building records. •Shading from neighborhood buildings strongly influences urban building performance. •A case study demonstrated the workflow, simulation and analysis of building retrofits. •CityBES retrofit analysis feature provides actionable information for decision making. •Discussed significance and challenges of urban building energy modeling. -- Abstract: Buildings in cities consume 30–70% of total primary energy, and improving building energy efficiency is one of the key strategies towards sustainable urbanization. Urban building energy models (UBEM) can support city managers to evaluate and prioritize energy conservation measures (ECMs) for investment and the design of incentive and rebate programs. This paper presents the retrofit analysis feature of City Building Energy Saver (CityBES) to automatically generate and simulate UBEM using EnergyPlus based on cities’ building datasets and user-selected ECMs. CityBES is a new open web-based tool to support city-scale building energy efficiency strategic plans and programs. The technical details of using CityBES for UBEM generation and simulation are introduced, including the workflow, key assumptions, and major databases. Also presented is a case study that analyzes the potential retrofit energy use and energy cost savings of five individual ECMs and two measure packages for 940 office and retail buildings in six city districts in northeast San Francisco, United States. The results show that: (1) all five measures together can save 23–38% of site energy per building; (2) replacing lighting with light-emitting diode lamps and adding air economizers to existing heating, ventilation and air-conditioning (HVAC) systems are most cost-effective with an average payback of 2.0 and 4.3 years, respectively; and (3) it is not economical to upgrade HVAC systems or replace windows in San Francisco due to the city’s mild

  4. Life cycle cost optimization of buildings with regard to energy use, thermal indoor environment and daylight

    DEFF Research Database (Denmark)

    Nielsen, Toke Rammer; Svendsen, Svend

    2002-01-01

    by the life cycle cost taking all expenses in the buildings service life into consideration. Also the performance of buildings is important as the performance influences the comfort of the occupants, heating demand etc. Different performance requirements are stated in building codes, standards......Buildings represent a large economical investment and have long service lives through which expenses for heating, cooling, maintenance and replacement depends on the chosen building design. Therefore, the building cost should not only be evaluated by the initial investment cost but rather...... and by the customer. The influence of different design variables on life cycle cost and building performance is very complicated and the design variables can be combined in an almost unlimited number of ways. Optimization can be applied to achieve a building design with low life cycle cost and good performance...

  5. Creating mold-free buildings: a key to avoiding health effects of indoor molds.

    Science.gov (United States)

    Small, Bruce M

    2003-08-01

    In view of the high costs of building diagnostics and repair subsequent to water damage--as well as the large medical diagnostic and healthcare costs associated with mold growth in buildings--commitment to a philosophy of proactive preventive maintenance for home, apartment, school, and commercial buildings could result in considerable cost savings and avoidance of major health problems among building occupants. The author identifies common causes of mold growth in buildings and summarizes key building design and construction principles essential for preventing mold contamination indoors. Physicians and healthcare workers must be made aware of conditions within buildings that can give rise to mold growth, and of resulting health problems. Timely advice provided to patients already sensitized by exposure to molds could save these individuals, and their families, from further exposures as a result of inadequate building maintenance or an inappropriate choice of replacement housing.

  6. New Firm Performance and the Replacement of Founder-CEOs

    DEFF Research Database (Denmark)

    Chen, Jing; Thompson, Peter

    2015-01-01

    We study the causes and consequences of the replacement of founder-CEOs in a sample of 4,172 Danish start-ups. We propose that founder-CEO replacement is driven in part by mismatches between business quality and founder ability. Our framework suggests that replacements are more likely among...... the worst- and best-performing firms, with low (high)-ability founders replaced by manager with higher (lower) ability. Replacement is not unambiguously associated with better subsequent performance. Firms that replaced the founder were much more likely to fail, but the surviving firms among them grew...

  7. Aging of elastomers in CANDU pressure boundary service

    International Nuclear Information System (INIS)

    VanBerlo, C.; Leidner, J.

    1987-09-01

    This report describes the properties and aging of elastomers, and examines the performance of major elastomeric components in CANDU pressure boundary service. The components examined are vacuum building roof seals, pressure relief duct seals, airlock door seals, fuelling machine hoses, and cable penetrations. For each of these components, the design requirements, technical specifications and component testing procedures are compared with applicable standards. Information on actual and recommended monitoring and maintenance methods is presented. Operational and environmental stressors are identified. Component failure modes, causes and frequencies are described, as well as the remedial action taken. Many different elastomers are used in CANDU plants, for many different applications. Standards and manufacturers' recommendations are not consistent and may vary from one component to another. Accordingly, the monitoring, maintenance and replacement practices tend to vary from one application to another, and may also be different at different stations. Recommendations are given in this report for improved monitoring and maintenance, in an attempt to provide more consistency in approach. A summary of some experiences with elastomers from non-Canadian sources is contained in the last section. 125 refs

  8. Building Software with Gradle

    CERN Multimedia

    CERN. Geneva; Studer, Etienne

    2014-01-01

    In this presentation, we will give an overview of the key concepts and main features of Gradle, the innovative build system that has become the de-facto standard in the enterprise. We will cover task declaration and task graph execution, incremental builds, multi-project builds, dependency management, applying plugins, extracting reusable build logic, bootstrapping a build, and using the Gradle daemon. By the end of this talk, you will have a good understanding of what makes Gradle so powerful yet easy to use. You will also understand why companies like Pivotal, LinkedIn, Google, and other giants with complex builds count on Gradle. About the speakers Etienne is leading the Tooling Team at Gradleware. He has been working as a developer, architect, project manager, and CTO over the past 15 years. He has spent most of his time building software products from the ground up and successfully shipping them to happy customers. He had ...

  9. Buildings Interoperability Landscape

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Dave [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stephan, Eric G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Corbin, Charles D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Widergren, Steven E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-12-31

    Through its Building Technologies Office (BTO), the United States Department of Energy’s Office of Energy Efficiency and Renewable Energy (DOE-EERE) is sponsoring an effort to advance interoperability for the integration of intelligent buildings equipment and automation systems, understanding the importance of integration frameworks and product ecosystems to this cause. This is important to BTO’s mission to enhance energy efficiency and save energy for economic and environmental purposes. For connected buildings ecosystems of products and services from various manufacturers to flourish, the ICT aspects of the equipment need to integrate and operate simply and reliably. Within the concepts of interoperability lie the specification, development, and certification of equipment with standards-based interfaces that connect and work. Beyond this, a healthy community of stakeholders that contribute to and use interoperability work products must be developed. On May 1, 2014, the DOE convened a technical meeting to take stock of the current state of interoperability of connected equipment and systems in buildings. Several insights from that meeting helped facilitate a draft description of the landscape of interoperability for connected buildings, which focuses mainly on small and medium commercial buildings. This document revises the February 2015 landscape document to address reviewer comments, incorporate important insights from the Buildings Interoperability Vision technical meeting, and capture thoughts from that meeting about the topics to be addressed in a buildings interoperability vision. In particular, greater attention is paid to the state of information modeling in buildings and the great potential for near-term benefits in this area from progress and community alignment.

  10. Energy management systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lush, D. M.

    1979-07-01

    An investigation is made of the range of possibilities available from three types of systems (automatic control devices, building envelope, and the occupants) in buildings. The following subjects are discussed: general (buildings, design and personnel); new buildings (envelope, designers, energy and load calculations, plant design, general design parameters); existing buildings (conservation measures, general energy management, air conditioned buildings, industrial buildings); man and motivation (general, energy management and documentation, maintenance, motivation); automatic energy management systems (thermostatic controls, optimized plant start up, air conditioned and industrial buildings, building automatic systems). (MCW)

  11. Lower limb joint replacement in rheumatoid arthritis

    Directory of Open Access Journals (Sweden)

    Clement Nicholas D

    2012-06-01

    Full Text Available Abstract Introduction There is limited literature regarding the peri-operative and surgical management of patients with rheumatoid disease undergoing lower limb arthroplasty. This review article summarises factors involved in the peri-operative management of major lower limb arthroplasty surgery for patients with rheumatoid arthritis. Methods We performed a search of the medical literature, using the PubMed search engine (http://www.pubmed.gov. We used the following terms: ‘rheumatoid’ ‘replacement’ ‘arthroplasty’ and ‘outcome’. Findings The patient should be optimised pre-operatively using a multidisciplinary approach. The continued use of methotrexate does not increase infection risk, and aids recovery. Biologic agents should be stopped pre-operatively due the increased infection rate. Patients should be made aware of the increased risk of infection and periprosthetic fracture rates associated with their disease. The surgical sequence is commonly hip, knee and then ankle. Cemented total hip replacement (THR and total knee replacement (TKR have superior survival rates over uncemented components. The evidence is not clear regarding a cruciate sacrificing versus retaining in TKR, but a cruciate sacrificing component limits the risk early instability and potential revision. Patella resurfacing as part of a TKR is associated with improved outcomes. The results of total ankle replacement remain inferior to THR and TKR. RA patients achieve equivalent pain relief, but their rehabilitation is slower and their functional outcome is not as good. However, the key to managing these complicated patients is to work as part of a multidisciplinary team to optimise their outcome.

  12. Aorto-right atrial fistula after ascending aortic replacement or aortic value replacement

    International Nuclear Information System (INIS)

    Zhi Aihua; Dai Ruping; Jiang Shiliang; Lu Bin

    2012-01-01

    Objective: To evaluate the CT features of aorto-right atrial fistula after aortic valve replacement (AVR) or ascending aortic replacement. Methods: Eighty-seven patients with aortic-right atrial fistula underwent CT after operation. The CT features were retrospectively analyzed. Fistula was measured according to maximum width of the shunt. Results: Aorto-right atrial fistula was detected in 87 patients after aortic valve replacement or ascending aortic replacement by CT scan. Among them, 25 patients were diagnosed as mild aorto-right atrial fistula, 47 patients as moderate, and 15 patients as severe. Thirty-seven patients underwent follow-up CT.Among them, 10 patients with mild to moderate aorto-right atrial fistula were considered to have complete regression, 8 patients with mild aorto-right atrial fistula considered to have incomplete regression, 14 patients with mild to moderate aorto-right atrial fistula considered to have stable condition, and 5 patients with moderate aorto-right atrial fistula considered to have progression at the 3-month follow-up. Conclusion: CT is a useful tool for defining aorto-right atrial fistula after AVR or ascending aortic replacement and for evaluating it in follow-up. (authors)

  13. Zero Energy Building

    DEFF Research Database (Denmark)

    Marszal, Anna Joanna; Heiselberg, Per; Bourrelle, J.S.

    2011-01-01

    The concept of Zero Energy Building (ZEB) has gained wide international attention during last few years and is now seen as the future target for the design of buildings. However, before being fully implemented in the national building codes and international standards, the ZEB concept requires......, (4) the type of energy balance, (5) the accepted renewable energy supply options, (6) the connection to the energy infrastructure and (7) the requirements for the energy efficiency, the indoor climate and in case of gird connected ZEB for the building–grid interaction. This paper focuses...

  14. Integrated Building Design

    DEFF Research Database (Denmark)

    Heiselberg, Per

    In the first half of the 20th century, HVAC systems and artificial lighting were developed to meet indoor comfort needs. Before the introduction of mechanical systems, climate - not building style or appearance - was the major determinant of building form. Comfort was achieved through passive means...... and architectural features built into the design. However, with the advent of new technologies, architects were no longer constrained by the need to ensure that buildings had ample daylighting, remained airy and cool in the summer and warm in the winter. Since HVAC systems and artificial lighting could satisfy...

  15. Building Social Web Applications

    CERN Document Server

    Bell, Gavin

    2009-01-01

    Building a web application that attracts and retains regular visitors is tricky enough, but creating a social application that encourages visitors to interact with one another requires careful planning. This book provides practical solutions to the tough questions you'll face when building an effective community site -- one that makes visitors feel like they've found a new home on the Web. If your company is ready to take part in the social web, this book will help you get started. Whether you're creating a new site from scratch or reworking an existing site, Building Social Web Applications

  16. Utilization of Palm Oil Clinker as Cement Replacement Material.

    Science.gov (United States)

    Kanadasan, Jegathish; Abdul Razak, Hashim

    2015-12-16

    The utilization of waste materials from the palm oil industry provides immense benefit to various sectors of the construction industry. Palm oil clinker is a by-product from the processing stages of palm oil goods. Channelling this waste material into the building industry helps to promote sustainability besides overcoming waste disposal problems. Environmental pollution due to inappropriate waste management system can also be drastically reduced. In this study, cement was substituted with palm oil clinker powder as a binder material in self-compacting mortar. The fresh, hardened and microstructure properties were evaluated throughout this study. In addition, sustainability component analysis was also carried out to assess the environmental impact of introducing palm oil clinker powder as a replacement material for cement. It can be inferred that approximately 3.3% of cement production can be saved by substituting palm oil clinker powder with cement. Reducing the utilization of cement through a high substitution level of this waste material will also help to reduce carbon emissions by 52%. A cleaner environment free from pollutants can be created to ensure healthier living. Certain industries may benefit through the inclusion of this waste material as the cost and energy consumption of the product can be minimized.

  17. Utilization of Palm Oil Clinker as Cement Replacement Material

    Directory of Open Access Journals (Sweden)

    Jegathish Kanadasan

    2015-12-01

    Full Text Available The utilization of waste materials from the palm oil industry provides immense benefit to various sectors of the construction industry. Palm oil clinker is a by-product from the processing stages of palm oil goods. Channelling this waste material into the building industry helps to promote sustainability besides overcoming waste disposal problems. Environmental pollution due to inappropriate waste management system can also be drastically reduced. In this study, cement was substituted with palm oil clinker powder as a binder material in self-compacting mortar. The fresh, hardened and microstructure properties were evaluated throughout this study. In addition, sustainability component analysis was also carried out to assess the environmental impact of introducing palm oil clinker powder as a replacement material for cement. It can be inferred that approximately 3.3% of cement production can be saved by substituting palm oil clinker powder with cement. Reducing the utilization of cement through a high substitution level of this waste material will also help to reduce carbon emissions by 52%. A cleaner environment free from pollutants can be created to ensure healthier living. Certain industries may benefit through the inclusion of this waste material as the cost and energy consumption of the product can be minimized.

  18. PURIFIED WASTE FCC CATALYST AS A CEMENT REPLACEMENT MATERIAL

    Directory of Open Access Journals (Sweden)

    Danute Vaiciukyniene

    2015-06-01

    Full Text Available Zeolites are commonly used in the fluid catalytic cracking process. Zeolite polluted with oil products and became waste after some time used. The quantity of this waste inevitably rises by expanding rapidly oil industry. The composition of these catalysts depends on the manufacturer and on the process that is going to be used. The main factors retarding hydration process of cement systems and modifying them strength are organic compounds impurities in the waste FCC catalyst. The present paper shows the results of using purified waste FCC catalyst (pFCC from Lithuania oil refinery, as Portland cement replacement material. For this purpose, the purification of waste FCC catalyst (FCC samples was treated with hydrogen peroxide. Hydrogen peroxide (H2O2 is one of the most powerful oxidizers known. By acting of waste with H2O2 it can eliminate the aforementioned waste deficiency, and the obtained product becomes one of the most promising ingredients, in new advanced building materials. Hardened cement paste samples with FCC or pFCC were formed. It was observed that the pFCC blended cements developed higher strength, after 28 days, compared to the samples with FCC or reference samples. Typical content of Portland cement substituting does not exceed 30 % of mass of Portland cement in samples. Reducing the consumption of Portland cement with utilizing waste materials is preferred for reasons of environmental protection.

  19. Machine Replacement, Technology Adoption and Convergence.

    OpenAIRE

    Boucekkine, Raouf; Martinez, Blanca

    1999-01-01

    In this paper, we introduce adoption costs in a canonical vintage capital model. Adoption costs take the form of a direct loss in production during a fixed period of time. We explicitly characterize the optimal machine replacement policy as a function of the adoption period. Using an explicit numerical method, we study the dynamics of the model. In particular, we find that while an increase in the adoption costs lowers the long run level of output, it also rises the magnitude of short run flu...

  20. Reactor vessel closure head replacements in 1997

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Framatome-Jeumont Industrie consortium have completed in 1997 28 reactor vessel (RV) closure head replacements, including five on 1300 MWe class PWR units. Framatome manages the operations and handles removal and reinstallation of equipment (not including the control rod drive mechanisms (CRDM)) and the requalification tests, while JI, which manufactures the CRDMs, is involved in the CRDM cutting, re-machining and welding operations, using tools of original design, in order to optimize the RV closure head operation in terms of costs, schedule and dosage

  1. Replacing OSE with Real Time capable Linux

    OpenAIRE

    Boman, Simon; Rutgersson, Olof

    2009-01-01

    For many years OSE has been a common used operating system, with real time extensions enhancements, in embed-ded systems. But in the last decades, Linux has grown and became a competitor to common operating systems and, in recent years, even as an operating system with real time extensions. With this in mind, ÅF was interested in replacing the quite expensive OSE with some distribution of the open source based Linux on a PowerPC MPC8360. Therefore, our purpose with thesis is to implement Linu...

  2. The replacement of technically obsolete equipments

    International Nuclear Information System (INIS)

    Anglaret, Ph.; Patouillaud, M.

    1987-01-01

    The paper covers the analysis of procedures for replacement of technically obsolete but still operational equipments in use in a nuclear power plant. The Three Mile Island accident showed that operators in the control room reqire additional information at their disposal. In 1986 CGEE Alsthom received two orders for improvements to control systems, for the South African nuclear power plant Koeberg and the Dutch nuclear power plant Borssele. The new systems will provide support to normal operation and offer additional help in accident situations. 4 figs

  3. To learn more about BHT replacement

    CERN Multimedia

    2002-01-01

    Following the article 'An improved financial tool to replace BHT' which appeared in Bulletin No 41/2002, dates of 4 general presentations were published. Please note that the time of the first presentation has changed from 16.00 hrs to 14.00 hrs. The dates/times are now as follows: Wednesday 16 October 14.00 hrs* IT Auditorium (English) *note change of time. Friday 18 October 16.00 hrs, SL Auditorium (French) Monday 21 October 10.00 hrs, LHC Auditorium (French) Wednesday 23 October 10.00 hrs, Council Chamber (English)

  4. Aortic Annular Enlargement during Aortic Valve Replacement

    Directory of Open Access Journals (Sweden)

    Selman Dumani

    2016-09-01

    Full Text Available In the surgery of aortic valve replacement is always attempted, as much as possible, to implant the larger prosthesis with the mains goals to enhance the potential benefits, to minimise transvalvular gradient, decrease left ventricular size and avoid the phenomenon of patient-prosthesis mismatch. Implantation of an ideal prosthesis often it is not possible, due to a small aortic annulus. A variety of aortic annulus enlargement techniques is reported to avoid patient-prosthesis mismatch. We present the case that has submitted four three times open heart surgery. We used Manouguian technique to enlarge aortic anulus with excellent results during the fourth time of surgery.

  5. Alternatives to testosterone replacement: testosterone restoration

    Directory of Open Access Journals (Sweden)

    Andrew McCullough

    2015-04-01

    Full Text Available The European Male Aging Study has demonstrated that the hypogonadism of male aging is predominantly secondary. Theoretically with appropriate stimulation from the pituitary, the aging testis should be able to produce eugonadal levels of testosterone. The strategies for the treatment of late onset hypogonadism (LOH have focused on replacement with exogenous testosterone versus restoration of endogenous production. The purpose of this article is to review existing peer-reviewed literature supporting the concept of restoration of endogenous testosterone in the treatment of LOH.

  6. Replacement of the ISIS control system

    International Nuclear Information System (INIS)

    Mannix, R.P.; Barton, C.J.; Brownless, D.M.; Kerr, J.C.

    1992-01-01

    In operation since 1985, ISIS is the world's most powerful pulsed spallation neutron source. The decision has been taken to replace the existing ISIS control system, which has been in use for over ten years. The problems of such a project, given the legacy of processor specific hardware and software are discussed, a long with the problems associated with incorporating existing interface hardware into any new system. Present progress using commercial workstation based control software is presented with, an assessment of the benefits and pitfalls of such an approach. (author)

  7. MILA Antenna Control Unit Replacement Project

    Science.gov (United States)

    Bresette, Jeremy

    2007-01-01

    The Air to Ground Subsystem (AGS) Antenna Control Units at the MILA Ground Network Tracking Station are at end-of-life and are being replaced. AGS consists of two antennas at MILA (Quad-Helix and Teltrac). Software was taken from the existing Subsystem Controller and modified for the Antenna Control Unit (ACU). The software is capable of receiving and sending commands to and from the ACU. Moving the azimuth clockwise, counterclockwise, moving the elevation up or down, turning servo power on and off, and inputting azimuth and elevation angles are commands that the antenna can receive.

  8. Infective endocarditis following transcatheter aortic valve replacement-

    DEFF Research Database (Denmark)

    Loh, Poay Huan; Bundgaard, Henning; S�ndergaard, Lars

    2013-01-01

    Transcatheter aortic valve replacement (TAVR) can improve the symptoms and prognosis of patients with severe aortic stenosis who, due to a high expected operative risk, would not have otherwise been treated surgically. If these patients develop prosthetic valve endocarditis, their presentations may...... be atypical causing a delay in the diagnosis and treatment. The management is also complicated by their comorbidities, and surgical treatment may not be feasible leading to a significant morbidity and mortality. We describe a case of an 85-year-old man with TAVI prosthetic valve endocarditis successfully...

  9. Steam generator replacement project in 2000

    International Nuclear Information System (INIS)

    Cerjak, J.; Holz, R.; Haus, J.; Gloaguen, C.

    1999-01-01

    NE Krsko has awarded the contract for the Steam Generator Replacement Project, which is one of the modernization projects in Krsko, to the Consortium of Siemens / Framatome in February 1998. This paper deals with the various aspects of the project: scope planning, engineering, preparation of modification packages for licensing, management, major techniques used, etc., showing also the status of the activities for the project which are scheduled to be performed in April through June 2000. The project is being performed on a turnkey basis, that means the Consortium is performing all engineering, preparation of the modification packages and site activities; NE Krsko is dealing with the licensing of the project.(author)

  10. A CMMS Expert using BIM for IBS Building Maintenance

    Directory of Open Access Journals (Sweden)

    Hamzah Noraini

    2016-01-01

    Full Text Available In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

  11. Commissioning for Humidified Buildings

    National Research Council Canada - National Science Library

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  12. Greening Existing Tribal Buildings

    Science.gov (United States)

    Guidance about improving sustainability in existing tribal casinos and manufactured homes. Many steps can be taken to make existing buildings greener and healthier. They may also reduce utility and medical costs.

  13. Net-zero building

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2013-01-01

    Full Text Available In its experimental work on research and development of innovative technologies for low income housing on the Innovation Site on the CSIR campus in Pretoria, the Building Science and Technology (BST) competence area identified a number...

  14. Building and Contents Insurance.

    Science.gov (United States)

    Freese, William C.

    Insurance coverage of school buildings and contents is becoming increasingly difficult to obtain, and increases of 50 percent or more in the premium are not uncommon. Methods of reducing premium increases are outlined in this speech. (MLF)

  15. Research Staff | Buildings | NREL

    Science.gov (United States)

    Research Staff Research Staff Photo of Roderick Jackson Roderick Jackson Laboratory Program Manager -related research at NREL. He works closely with senior laboratory management to set the strategic agenda for NREL's buildings portfolio, including all research, development, and market implementation

  16. Environmental indicators for buildings

    DEFF Research Database (Denmark)

    Dammann, S.

    Whenever we shop, the products we consider buying are labelled with the economical price we have to pay if we want to purchase them - an important parameter in our decisions as purchasers. The increrasing awareness for environmental limits and backlashes of human activities also in the building...... sector have fostered the wish to define 'the ecological price' of a building as a help for environmental conscious decision-making. In a social constructivist approach this Ph.D. thesis looks across and beyond the manifold existing approaches for environmental indicators for buildings. It acknowledges...... in the Netherlands. It identifies lines of conflict and areas of consent betweeen the relevant actors and elaborates scenarios for a possible closure of ongoing debate about environmental indicators for buildings....

  17. Building a Circular Future

    DEFF Research Database (Denmark)

    Merrild, Heidi

    2016-01-01

    Natural resources are scarce and construction accounts for 40 percent of the material and energy consumption in Europe. This means that a switch to a circular future is necessary. ’Building a Circular Future’ maps out where we are, where we are going, and what is needed for this conversion to take...... on the project’s strategies. The financial result is a profit of DKK 35 million on the structure alone in the demolition of a building built for the cost of DKK 860 million. The total potential for the whole building, calculated in projected material prices, is estimated to be up to 16% of the total construction...... of the circular strategies is not only in the future. Increased flexibility, optimized operation and maintenance, as well as a healthier building, is low-hanging fruit that can be harvested today. The project’s principles can be implemented in industrialized construction in a large scale today. That is proven...

  18. Buildings exposed to fire

    International Nuclear Information System (INIS)

    1987-01-01

    The 24 lectures presented to the colloquium cover the following subject fields: (1) Behaviour of structural components exposed to fire; (2) Behaviour of building materials exposed to fire; (3) Thermal processes; (4) Safety related, theoretical studies. (PW) [de

  19. Municipal Building Energy Usage

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This data set contains energy use data from 2009-2014 for 139 municipally operated buildings. Metrics include: Site & Source EUI, annual electricity, natural...

  20. Radioactivity of building materials

    International Nuclear Information System (INIS)

    Terpakova, E.

    2000-01-01

    In this paper the gamma-spectrometric determination of natural radioactivity in the different building materials and wares applied in Slovakia was performed. The specific activities for potassium-40, thorium, radium as well as the equivalent specific activities are presented

  1. LED Lightbulbs as a Source of Electricity Saving in Buildings

    Directory of Open Access Journals (Sweden)

    Zeb Akhtar

    2016-01-01

    Full Text Available Today a number of renewable energy technologies are available for power generation, but fossil fuels are still providing a dominant share nevertheless. In order to decrease the electric bill and save our environment, energy conservation is always crucial. In this paper a very interesting idea is presented which is economically viable to reduce electricity usage in our buildings. An effort has been made to estimate the amount of energy that could be saved in the dormitory section of the IMOP building in Russia. Although there are many ways to reduce the consumption of electricity in this building but here the emphasis is on changing light bulbs inside the rooms, kitchen, toilet and bathroom of each apartment. The scope of the study is to figure out monthly electricity saving by replacing traditional light bulbs by LED light bulbs in the building under consideration. The total investment required and the payback period is also presented.

  2. ECONOMIC AND FINANCIAL ANALYSIS OF THE BUILDINGS REHABILITATION SOLUTIONS

    Directory of Open Access Journals (Sweden)

    STAN IVAN F.E.

    2016-07-01

    Full Text Available The paper includes a simplified economical and financial analysis of the buildings rehabilitation solutions, for heating and lighting. The most important economic and financial indicators analyzed and determined are: economic return on investment and payback period of investment in dynamic form, net present value, and internal rate of return economic residual value of the investment on thermal insulation, building maintenance costs, energy costs. In order to reduce the electricity consumption: the methods consisted in replacing inefficient lighting with some efficient energy and for heat consumption: the proposed solution was building rehabilitation (exterior wall insulation, floor insulation board. The analysis consists in determining the economical and financial indicators before and after the building rehabilitation. The 3 rooms apartment is located in Craiova town, (wind zone IV, 2nd floor, orientation is S.

  3. Hypoparathyroidism: Replacement Therapy with Parathyroid Hormone

    Directory of Open Access Journals (Sweden)

    Lars Rejnmark

    2015-12-01

    Full Text Available Hypoparathyroidism (HypoPT is characterized by low serum calcium levels caused by an insufficient secretion of parathyroid hormone (PTH. Despite normalization of serum calcium levels by treatment with activated vitamin D analogues and calcium supplementation, patients are suffering from impaired quality of life (QoL and are at increased risk of a number of comorbidities. Thus, despite normalization of calcium levels in response to conventional therapy, this should only be considered as an apparent normalization, as patients are suffering from a number of complications and calcium-phosphate homeostasis is not normalized in a physiological manner. In a number of recent studies, replacement therapy with recombinant human PTH (rhPTH(1-84 as well as therapy with the N-terminal PTH fragment (rhPTH(1-34 have been investigated. Both drugs have been shown to normalize serum calcium while reducing needs for activated vitamin D and calcium supplements. However, once a day injections cause large fluctuations in serum calcium. Twice a day injections diminish fluctuations, but don't restore the normal physiology of calcium homeostasis. Recent studies using pump-delivery have shown promising results on maintaining normocalcemia with minimal fluctuations in calcium levels. Further studies are needed to determine whether this may improve QoL and lower risk of complications. Such data are needed before replacement with the missing hormone can be recommended as standard therapy.

  4. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  5. An improved financial tool to replace BHT

    CERN Multimedia

    2002-01-01

    In November, the BHT tool used to control financial data will be replaced by an improved and more powerful system, called CET for CERN Expenditure Tracking. The team in charge of CET. From left to right, sitting, Martyn Rankin, David McGlashan, standing, Per Gunnar Jonsson, James Purvis and Mikael Angberg. After 10 years of BHT at CERN, in order to face the challenges of the LHC era, and following the recommendations of the External Review Committee, the BHT application will be replaced by an improved and more powerful expenditure tracking tool called CET for CERN Expenditure Tracking. For those who are not familiar with it, the BHT, Budget Holders Toolkit, is a utility that provides a way to view CERN financial data. It is available for users who have access to at least one budget code. The new CET represents a tool that not only allows powerful analysis of the past, but also assists in forecasting the future. CET will offer significantly more functionality than BHT, including extended contract analysis, ...

  6. LS1 Report: Replacing an antique

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    At the PS Booster, the old beam dump and the shielding blocks surrounding it have been removed (see here). Installation of the new beam dump is now under way (see video).   The new PSB beam dump during its installation. At the PS, replacement of the old cooling and ventilation system, which dated back to 1957, is progressing well. The dismantling phase has just been completed and the tunnel is being prepared to receive a brand new ventilation system offering more efficient aeration of radioactive areas. At the same time, testing of the newly installed access system is under way. At the SPS, all the equipment of the Long Straight Section 1 (LSS1) has been removed to make way for the campaign to replace the irradiated cables, which started this week. In the LHC, the Radiation to Electronics (R2E) campaign is still progressing at a good clip, especially at Point 1, where the teams are two and a half months ahead of schedule. The Superconducting Magnets and Circuits Consolidation (SMACC) proje...

  7. BABAR IFR Replacement R and D

    CERN Document Server

    Berry, M

    2003-01-01

    The Instrumented Flux Return (IFR) of the BaBar detector will soon need to be replaced by a more robust muon detection system. Scintillator bars with embedded Wavelength Shifting (WLS) fibers and Limited Streamer Tubes are two replacement technology options. The scintillator bars are tested for attenuation length; and causes for the large width of the Photo Multiplier Tube (PMT) signal are analyzed by Monte Carlo simulation. Cooling techniques for Avalanche Photo Diodes (APD) are investigated. The fairly high attenuation length coupled with the narrow PMT signal make the scintillator a viable option for a muon detecting system. Continuing work will focus on increasing timing resolution using an APD to read the signal from the WLS fibers, and investigating the lifetime of the APD. The ability to read a signal from the LST on external copper strips is tested and signals are found to be clearly distinguishable from noise. The voltage is compared to count rate to find that the optimal operating voltage for the LS...

  8. Transdermal testosterone replacement therapy in men

    Science.gov (United States)

    Ullah, M Iftekhar; Riche, Daniel M; Koch, Christian A

    2014-01-01

    Androgen deficiency syndrome in men is a frequently diagnosed condition associated with clinical symptoms including fatigue, decreased libido, erectile dysfunction, and metabolic syndrome. Serum testosterone concentrations decline steadily with age. The prevalence of androgen deficiency syndrome in men varies depending on the age group, known and unknown comorbidities, and the respective study group. Reported prevalence rates may be underestimated, as not every man with symptoms of androgen deficiency seeks treatment. Additionally, men reporting symptoms of androgen deficiency may not be correctly diagnosed due to the vagueness of the symptom quality. The treatment of androgen deficiency syndrome or male hypogonadism may sometimes be difficult due to various reasons. There is no consensus as to when to start treating a respective man or with regards to the best treatment option for an individual patient. There is also lack of familiarity with treatment options among general practitioners. The formulations currently available on the market are generally expensive and dose adjustment protocols for each differ. All these factors add to the complexity of testosterone replacement therapy. In this article we will discuss the general indications of transdermal testosterone replacement therapy, available formulations, dosage, application sites, and recommended titration schedule. PMID:24470750

  9. Renal function after elective total hip replacement

    DEFF Research Database (Denmark)

    Perregaard, Helene; Damholt, Mette B; Solgaard, Søren

    2016-01-01

    Background and purpose - Acute kidney injury (AKI) is associated with increased short-term and long-term mortality in intensive care populations and in several surgical specialties, but there are very few data concerning orthopedic populations. We have studied the incidence of AKI and the prevale......Background and purpose - Acute kidney injury (AKI) is associated with increased short-term and long-term mortality in intensive care populations and in several surgical specialties, but there are very few data concerning orthopedic populations. We have studied the incidence of AKI...... and the prevalence of chronic kidney disease (CKD) in an elective population of orthopedic patients undergoing primary total hip replacement, hypothesizing that chronic kidney disease predisposes to AKI. Patients and methods - This was a single-center, population-based, retrospective, registry-based cohort study...... involving all primary elective total hip replacements performed from January 2003 through December 2012. Patient demographics and creatinine values were registered. We evaluated the presence of CKD and AKI according to the international guidelines for kidney disease (KDIGO Acute Kidney Injury Workgroup 2013...

  10. Meniscus tear surgery and meniscus replacement

    Science.gov (United States)

    Vaquero, Javier; Forriol, Francisco

    2016-01-01

    Summary Objective the menisci are easily injured and difficult to repair. The aim of this study was to analyze the current state of meniscal surgery aimed at preserving morphology and conserving the biomechanics of the knee to prevent joint degeneration. Methodology a search of the electronic medical literature database Medline was conducted, from http://www.ncbi.nlm.nih.gov/pubmed. The search was not limited by language. Candidate articles were identified by searching for those that included the keywords meniscus, surgery, suture, implant, allograft. The limits were included for clinical research and clinical trials. Basic research was not included. The studies selected were evaluated and classified in three different categories: basic science, reconstruction (suture and meniscectomy) and implants (scaffolds and allograft). Results the consequences of meniscectomy performed at a young age can lead to a joint cartilage degeneration twenty years later. There are few surgical options for the repair of meniscal injuries in order both to preserve the meniscus and to ensure the long term survival of the knee joint, meniscectomy, repair, suturing the tear, or reconstruction, when a meniscal allograft or synthetic substitute is used to replace the meniscus, but the biomechanical properties of the native meniscus are not reproduced entirely by the scaffolds that exist today. Conclusion therapies that successfully repair or replace the meniscus are therefore likely to prevent or delay osteoarthritis progression. PMID:27331034

  11. Plataforma smart building

    OpenAIRE

    Cidrera Lopez, Alain

    2013-01-01

    The overall project is a system (hardware + software) that allows monitoring and control in a building / office different security systems, energy, communications, home automation, PKI's overall business that will increase all the efficiency of the building and the business and ensure the continuity of it. My participation in this Project will mainly focus on the development of hardware components, monitoring and control system (home automation, energy, safety control elements ...) and softwa...

  12. BUILDING MECHATRONICS SIMULATION SYSTEM

    OpenAIRE

    HUSI Géza; SZÁSZ Csaba; HASHIMOTO Hideki; NIITSUMA Mihoko

    2014-01-01

    In international references a net zero-energy building (NZEB) is defined as a residential or commercial building with greatly reduced energy needs through efficiency gains such that the balance of energy needs can be supplied with renewable technologies. According to this general term definition, the essence of the concept is that by using low-cost and locally available nonpolluting sources, they generate energy onsite, in a quantity equal or greater than the total amo...

  13. Potential Mixture of POFA and SCBA as Cement Replacement in Concrete – A Review

    Directory of Open Access Journals (Sweden)

    Ali Noorwirdawati

    2017-01-01

    Full Text Available Concrete is an important material used in all kind of building construction and ordinary Portland cement (OPC is one of an important element in the production of concrete. However, the production of cement causes a problem because of high CO2 emission to atmosphere. The manufacture of 1 tonnes of cement would produce approximately released 1 tonnes of CO2. So, the need to search another material that can replace a cement with same properties and environmental friendly are crucial. The suitable material to replace cement has to be a pozzolanic materials. This is because pozzolanic materials has cementitious properties and high silica content. Palm oil fuel ash (POFA and sugarcane bagasse ash (SCBA are the material that suitable to replace cement because of high silica content. The use of POFA and SCBA in concrete has been studied by many researcher and it has been proved to improve the mechanical strength of the concrete either in normal concrete, high strength concrete or lightweight concrete. This paper would discuss the overview of the previous study on the cement replacement by POFA and SCBA and the potential of the both materials to be mix together to improve its properties. The chemical element which will be the focus point is SiO4, MgO, CaO and SO3, while the physical and mechanical properties such as workability, specific gravity, compressive strength and tensile strength will also be reviewed.

  14. National Tribal Building Codes Summit

    Science.gov (United States)

    National Tribal Building Codes summit statement developed to support tribes interested in adopting green and culturally-appropriate building systems to ensure safe, sustainable, affordable, and culturally-appropriate buildings on tribal lands.

  15. THE AGGREGATE IMPLICATIONS OF MACHINE REPLACEMENT: THEORY AND EVIDENCE

    OpenAIRE

    John Haltiwanger; Russell Cooper

    1992-01-01

    The authors study an economy in which producers incur resource costs to replace depreciated machines. The process of costly replacement and depreciation creates endogenous fluctuations in productivity, employment, and output of a single producer. The authors explore the spillover effects of machine replacement on other sectors of the economy and provide conditions for synchronized machine replacement by multiple independent producers. The implications of their model are generally consistent w...

  16. Method and refrigerants for replacing existing refrigerants in centrifugal compressors

    International Nuclear Information System (INIS)

    Kopko, W.L.

    1991-01-01

    This patent describes a method for replacing an existing refrigerant in a centrifugal compressor. It comprises selecting a desired impeller Mach number for the centrifugal compressor; selecting a base refrigerant constituent; combining at least one additive refrigerant constituent with the base refrigerant constituent to form a replacement refrigerant having at least one physical or chemical property different from the existing refrigerant and substantially providing the desired impeller Mach number in the centrifugal compressor; and replacing the existing refrigerant with the replacement refrigerant

  17. Property Assessment of Sponge Cake Added with Egg Replacer

    OpenAIRE

    Yaqiang He; Linlin Wang; Qian Lu

    2015-01-01

    Chicken egg which is always used in sponge cake production is likely to deteriorate during storage or transportation. This weakness prevents the wide use of chicken egg in sponge cake making. In order to solve this problem, egg replacer has been developed. In this study, effect of egg replacer on the property of sponge cake was analyzed. The result indicated egg replacer could improve the yield rate and specific volume of sponge cake. However, high content of egg replacer would negatively imp...

  18. Diffusion in building wakes

    International Nuclear Information System (INIS)

    Ramsdell, J.V.

    1988-03-01

    Straight-line Gaussian models adequately describe atmospheric diffusion for many applications. They have been modified for use in estimating diffusion in building wakes by adding terms that include projected building area and by redefining the diffusion coefficients so that the coefficients have minimum values that are related to building dimensions. In a recent study, Ramsdell reviewed the building-wake dispersion models used by the Nuclear Regulatory Commission (NRC) in its control room habitability assessments. The review included comparison of model estimates of centerline concentrations with concentrations observed in experiments at seven nuclear reactors. In general, the models are conservative in that they tend to predict concentrations that are greater than those actually observed. However, the models show little skill in accounting for variations in the observed concentrations. Subsequently, the experimental data and multiples linear regression techniques have been used to develop a new building wake diffusion model. This paper describes the new building wake model and compares it with other models. 8 refs., 2 figs

  19. Building Canada: Phase One

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2004-04-15

    The 'Building Canada' program modelled after the 'Building America' program, aims at increasing energy efficiency and affordability, primarily for single family homes. The program takes a holistic and whole house view, employing a systems approach and is committed to continuous improvement through testing, evaluation, retesting and novel construction practices. The program's objective is to re-engineer house designs so that builders can take advantage of advanced products and achieve maximum efficiency. Building Canada aims to achieve its objectives through partnership with the housing industry, focusing on increasing energy efficiency while reducing construction time, using and wasting fewer materials, forestalling call backs, and reducing overall costs. The Building Canada procedures encompass marketing, research of builder's operations, re-engineering mechanical systems, framing components and techniques, moisture control and thermal performance, construction, resolution of problems in re-engineered homes, and discussion of results in demonstration homes. The program as a whole is built on the feasibility study of a Building Canada program carried out in Nova Scotia and Ontario. Some of the results of this pilot study summarized in this report indicate that the Building Canada is not suitable for use by small builders. Benefits are most likely to be realized by only by builders constructing more than 100 homes annually.

  20. 14 CFR 21.9 - Replacement and modification articles.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Replacement and modification articles. 21.9... CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS General § 21.9 Replacement and modification articles. (a) If a person knows, or should know, that a replacement or modification article is reasonably likely to be...

  1. 30 CFR 75.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 75.1438 Section 75.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... attachment replacement. Wire rope attachments shall be replaced when cracked, deformed, or excessively worn. ...

  2. 30 CFR 57.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 57.19028 Section 57.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Hoisting Wire Ropes § 57.19028 End attachment replacement. Wire rope attachments shall be replaced when...

  3. 30 CFR 56.19028 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 56.19028 Section 56.19028 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL... Wire Ropes § 56.19028 End attachment replacement. Wire rope attachments shall be replaced when cracked...

  4. 45 CFR 201.70 - Treatment of replacement checks.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Treatment of replacement checks. 201.70 Section... STATES FOR PUBLIC ASSISTANCE PROGRAMS Review and Audits § 201.70 Treatment of replacement checks. (a... (FFP) for replacement checks under titles I, VI-A, X, XIV, XVI (AABD) except under the circumstances...

  5. 30 CFR 77.1438 - End attachment replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false End attachment replacement. 77.1438 Section 77.1438 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND... Personnel Hoisting Wire Ropes § 77.1438 End attachment replacement. Wire rope attachments shall be replaced...

  6. 30 CFR 56.12036 - Fuse removal or replacement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fuse removal or replacement. 56.12036 Section 56.12036 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... § 56.12036 Fuse removal or replacement. Fuses shall not be removed or replaced by hand in an energized...

  7. Hip Resurfacing: An Alternative to Conventional Hip Replacement?

    Science.gov (United States)

    ... Is hip resurfacing a good alternative to hip replacement? Answers from Mark Spangehl, M.D. Hip resurfacing has lost favor with many surgeons ... women with poor bone quality. Unlike traditional hip replacement, hip resurfacing doesn't completely replace the "ball" ...

  8. 21 CFR 870.3710 - Pacemaker repair or replacement material.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Pacemaker repair or replacement material. 870.3710... (CONTINUED) MEDICAL DEVICES CARDIOVASCULAR DEVICES Cardiovascular Prosthetic Devices § 870.3710 Pacemaker repair or replacement material. (a) Identification. A pacemaker repair or replacement material is an...

  9. 48 CFR 908.7112 - Materials handling equipment replacement standards.

    Science.gov (United States)

    2010-10-01

    ... equipment replacement standards. 908.7112 Section 908.7112 Federal Acquisition Regulations System DEPARTMENT... Special Items 908.7112 Materials handling equipment replacement standards. Materials handling equipment shall be purchased for replacement purposes in accordance with the standards in FPMR 41 CFR 101-25.405...

  10. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  11. 16 CFR 501.3 - Replacement bags for vacuum cleaners.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Replacement bags for vacuum cleaners. 501.3... REQUIREMENTS AND PROHIBITIONS UNDER PART 500 § 501.3 Replacement bags for vacuum cleaners. Replacement bags for..., provided: (a) The quantity of contents is expressed in terms of numerical count of the bags; (b) A...

  12. Replacement Models Revisited | Alabi | Journal of Research in ...

    African Journals Online (AJOL)

    The objective is to review the annual total cost and the cumulative annual total cost average hitherto used as replacement methods. The study showed some disparity in the optimal age of single replacement as used by some authors. Hence, an arithmetic mean method of finding the optimal single- replacement- age of an ...

  13. New one cycle criteria for optimizing preventive replacement policies

    International Nuclear Information System (INIS)

    Hamidi, Maryam; Szidarovszky, Ferenc; Szidarovszky, Miklos

    2016-01-01

    Models are introduced and examined for the optimum scheduling of preventive replacements. The “replace first” and “replace last” models are known from the literature if the long term expected cost per unit time is minimized. We will first introduce the one cycle counterparts of these models when the expected costs per unit time in a single cycle is minimized. If the unit performs identical projects sequentially then the “replace next” model assumes that the preventive replacement is postponed until the ongoing project is finished. The termination time of this project is random which also depends on the scheduled time of the preventive replacement in contrary to the “replace first” and “replace last” models. The mathematical models are formulated and conditions are given for the existence of finite optima. Numerical examples and a simulation study illustrate the methodology and the numerical results show interesting comparisons of the different models. - Highlights: • The Single cycle age replacement model is extended incorporating repairable failures. • In order to avoid project interruption costs, three model variants are discussed. • Model variants are replace first, replace last and replace next. • In many cases analytic solutions are derived and illustrated by numerical examples. • The different model variants and their results are compared based on simulation studies.

  14. A single - item replacement decision model for repairable spare ...

    African Journals Online (AJOL)

    In this paper, we present an analytical method for determining spare parts replacement over an infinite planning horizon. (The objective is to minimize the total system cost). We develop an exact and simple method for determining the time for equipment replacement or making decision about when to replace equipments, ...

  15. 48 CFR 908.7101-4 - Replacement of motor vehicles.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Replacement of motor....7101-4 Replacement of motor vehicles. (a) The replacement of motor vehicles shall be in accordance with... Heads of Contracting Activities may arrange to sell, as exchange sales, used motor vehicles being...

  16. Avascular necrosis of bone complicating corticosteroid replacement therapy.

    OpenAIRE

    Williams, P L; Corbett, M

    1983-01-01

    Two patients who developed widespread severe avascular necrosis of bone while on steroid replacement therapy are described. One, a diabetic, underwent yttrium-90 pituitary ablation for retinopathy and developed avascular necrosis within 18 months of starting prednisolone. The other, who had Addison's disease, developed avascular necrosis within 14 months of starting cortisol replacement therapy. Both cases came to bilateral total hip replacement.

  17. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory

    International Nuclear Information System (INIS)

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL's existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required

  18. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  19. Building Services Requests Subsystem (BSRS) -

    Data.gov (United States)

    Department of Transportation — Lotus Notes workflow application used for the submission, processing, tracking and reporting of building service related requiests. Enables regional office building...

  20. Optimal timing for intravenous administration set replacement.

    Science.gov (United States)

    Gillies, D; O'Riordan, L; Wallen, M; Morrison, A; Rankin, K; Nagy, S

    2005-10-19

    Administration of intravenous therapy is a common occurrence within the hospital setting. Routine replacement of administration sets has been advocated to reduce intravenous infusion contamination. If decreasing the frequency of changing intravenous administration sets does not increase infection rates, a change in practice could result in considerable cost savings. The objective of this review was to identify the optimal interval for the routine replacement of intravenous administration sets when infusate or parenteral nutrition (lipid and non-lipid) solutions are administered to people in hospital via central or peripheral venous catheters. We searched The Cochrane Central Register of Controlled Trials (CENTRAL), MEDLINE, CINAHL, EMBASE: all from inception to February 2004; reference lists of identified trials, and bibliographies of published reviews. We also contacted researchers in the field. We did not have a language restriction. We included all randomized or quasi-randomized controlled trials addressing the frequency of replacing intravenous administration sets when parenteral nutrition (lipid and non-lipid containing solutions) or infusions (excluding blood) were administered to people in hospital via a central or peripheral catheter. Two authors assessed all potentially relevant studies. We resolved disagreements between the two authors by discussion with a third author. We collected data for the outcomes; infusate contamination; infusate-related bloodstream infection; catheter contamination; catheter-related bloodstream infection; all-cause bloodstream infection and all-cause mortality. We identified 23 references for review. We excluded eight of these studies; five because they did not fit the inclusion criteria and three because of inadequate data. We extracted data from the remaining 15 references (13 studies) with 4783 participants. We conclude that there is no evidence that changing intravenous administration sets more often than every 96 hours

  1. Implementation strategy for achieving replacement level fertility.

    Science.gov (United States)

    1993-01-01

    The recommendation of the Bali Declaration on Population and Sustainable Development at the ESCAP regional conference was to adopt strategies for attaining replacement-level fertility of 2.1 or 2.2 children by 2010. East Asian countries, except Mongolia and the Democratic People's Republic of Korea, and the Southeast Asian countries Singapore and Thailand have already reached replacement-level fertility. Most larger Oceanic countries have also done so. Only South Asian Sri Lanka and southern India have attained replacement level. The following conditions slow or hinder the goal, but they do not provide an "absolute" barrier to fertility decline: social welfare schemes and old age security, son preference, lack of government family planning, poverty, relatively high mortality, low status of women, and education status. Theories of demographic transition have postulated that economic and social development initially brings a decline in mortality, and later brings a decline in fertility; and high fertility was an adaptation to high mortality. Policy gets caught in the lag between mortality and fertility decline. Eventually the cultural motives for high fertility are undercut by social and economic development. Although the generalization that economic growth slows fertility is true for South Asia, the correlation is uneven. Forceful government-sponsored family planning programs in Bangladesh and China may lead the way to strategies for decline in ESCAP region. A Thailand study suggested important factors were fundamental social change, the increased cost of children, cultural acceptance of birth control, a latent demand for fertility control, and government efforts in family planning. ESCAP countries have in common relatively high morality and inadequate public health programs, patriarchal structures, and limited female autonomy, poverty and landlessness, lack of community cohesiveness, and inadequate family planning programs. Weaknesses in programs are attributed to

  2. Building Better Buildings: Sustainable Building Activities in California Higher Education Systems.

    Science.gov (United States)

    Sowell, Arnold; Eichel, Amanda; Alevantis, Leon; Lovegreen, Maureen

    2003-01-01

    This article outlines the activities and recommendations of California's sustainable building task force, discusses sustainable building activities in California's higher education systems, and highlights key issues that California is grappling with in its implementation of sustainable building practices. (EV)

  3. Procurement of replacement pressure vessels for MURR

    International Nuclear Information System (INIS)

    Meyer, W.A. Jr.; Edwards, C.B. Jr.; McKibben, J.C.; Schoone, A.R.

    1989-01-01

    The University of Missouri Research Reactor Facility (MURR) located in Columbia, Missouri, is the highest powered, highest steady-state flux university research reactor in the United States. The reactor is a 10-MW pressurized loop, in-pool-type, light-water-moderated, beryllium-reflected, flux trap reactor. MURR has a compact core (0.033 m 3 ) composed of eight fuel elements of the materials test reactor type arranged as an annular right circular cylinder between the inner and outer aluminum pressure vessels. Conservative engineering judgment resulted in the decision in 1988 to purchase new inner and outer pressure vessels. This paper details the difficulties encountered in procuring replacements for aluminum pressure vessels built to standards that are no longer applicable in attempting to meet nuclear standards that are not applicable to nonferrous material

  4. Segmental blood pressure after total hip replacement

    DEFF Research Database (Denmark)

    Gebuhr, Peter Henrik; Soelberg, M; Henriksen, Jens Henrik Sahl

    1992-01-01

    Twenty-nine patients due to have a total hip replacement had their systemic systolic and segmental blood pressures measured prior to operation and 1 and 6 weeks postoperatively. No patients had signs of ischemia. The segmental blood pressure was measured at the ankle and at the toes. A significant...... drop was found in all pressures 1 week postoperatively. The decrease followed the systemic pressure and was restored to normal after 6 weeks. In a group of six patients with preoperatively decreased ankle pressure, a significant transient further decrease in the ankle-toe gradient pressure was found...... on the operated side. None of the patients had symptoms from the lowered pressure. We conclude that in patients without signs of ischemia, the postoperative segmental pressure decrease is reversible and therefore not dangerous....

  5. Replacement of Swiss "Attestations de fonctions"

    CERN Multimedia

    DG Unit

    2009-01-01

    The Swiss Permanent Mission has informed CERN that the "attestations de fonctions" issued to certain members of the personnel and the "attestations" issued to their family members will gradually be replaced by P-type "cartes de légitimation" (see specimen copies below). This card’s name, together with its more contemporary design compared with old-style "Attestations" issued in the 1970s, will make the holder’s daily life much easier, e.g. when crossing borders, renting accommodation or setting up a telephone line. The Users Office (PH Department) and the Cards Office (HR Department), which are responsible for handling requests for "cartes de légitimation", will provide information in due course on how they intend to organise the exchange of "attestations" (priority will be given to residents of Switzerland, in parti...

  6. Sex hormone replacement in Turner syndrome

    DEFF Research Database (Denmark)

    Trolle, Christian; Hjerrild, Britta; Cleemann, Line Hartvig

    2012-01-01

    The cardinal features of Turner syndrome (TS) are short stature, congenital abnormalities, infertility due to gonadal dysgenesis, with sex hormone insufficiency ensuing from premature ovarian failure, which is involved in lack of proper development of secondary sex characteristics and the frequent...... osteoporosis seen in Turner syndrome. But sex hormone insufficiency is also involved in the increased cardiovascular risk, state of physical fitness, insulin resistance, body composition, and may play a role in the increased incidence of autoimmunity. Severe morbidity and mortality affects females with Turner...... syndrome. Recent research emphasizes the need for proper sex hormone replacement therapy (HRT) during the entire lifespan of females with TS and new hypotheses concerning estrogen receptors, genetics and the timing of HRT offers valuable new information. In this review, we will discuss the effects...

  7. Material Science in Cervical Total Disc Replacement

    Science.gov (United States)

    Pham, Martin H.; Mehta, Vivek A.; Tuchman, Alexander; Hsieh, Patrick C.

    2015-01-01

    Current cervical total disc replacement (TDR) designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti), and cobalt-chrome (CoCr). These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation. PMID:26523281

  8. Material Science in Cervical Total Disc Replacement

    Directory of Open Access Journals (Sweden)

    Martin H. Pham

    2015-01-01

    Full Text Available Current cervical total disc replacement (TDR designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti, and cobalt-chrome (CoCr. These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation.

  9. Contribution to optimization of preventive replacement

    International Nuclear Information System (INIS)

    Legat, V.; Zaludova, A.H.; Cervenka, V.; Jurca, V.

    1996-01-01

    The paper presents a method for determining the optimal interval for preventive maintenance/replacement using either an age-based or diagnostic-based renewal strategy. For the case of a finite-time horizon, for which the computations are complicated, a simple formula is proposed for modifying the commonly used inifinite-time solution so that it gives a good approximation to the exact finite-time solution. Examples demonstrate that the method is sufficiently accurate and simple in practice for typical engineering components with Weibull life distributions and for a reasonable range of the cost factor (ratio of unit corrective to unit preventive maintenance costs). This paper investigates the problem of the accuracy of the results compared to the exact, finite-time solution for a selected matrix of time-to failure Weibull shape parameters and cost factors commonly occurring in technical practice. Applications offer substantial benefits to both manufacturer and user of technical equipment

  10. Saildrone fleet could help replace aging buoys

    Science.gov (United States)

    Voosen, Paul

    2018-03-01

    In April, two semiautonomous drones, developed by Saildrone, a marine tech startup based in Alameda, California, in close collaboration with the National Oceanic and Atmospheric Administration in Washington, D.C., are set to return from an 8-month tour of the Pacific Ocean. This the first scientific test for the drones, which are powered only by the wind and sun, in the Pacific Ocean. The voyage is an important step in showing that such drones, carrying 15 different sensors, could help replace an aging and expensive array of buoys that are the main way scientists sniff out signs of climate-disrupting El Niño events. If successful, scientists envision fleets of similar drones spreading across the ocean, inviting thoughts of what it could be like to do oceanography without a ship.

  11. Material Science in Cervical Total Disc Replacement.

    Science.gov (United States)

    Pham, Martin H; Mehta, Vivek A; Tuchman, Alexander; Hsieh, Patrick C

    2015-01-01

    Current cervical total disc replacement (TDR) designs incorporate a variety of different biomaterials including polyethylene, stainless steel, titanium (Ti), and cobalt-chrome (CoCr). These materials are most important in their utilization as bearing surfaces which allow for articular motion at the disc space. Long-term biological effects of implanted materials include wear debris, host inflammatory immune reactions, and osteolysis resulting in implant failure. We review here the most common materials used in cervical TDR prosthetic devices, examine their bearing surfaces, describe the construction of the seven current cervical TDR devices that are approved for use in the United States, and discuss known adverse biological effects associated with long-term implantation of these materials. It is important to appreciate and understand the variety of biomaterials available in the design and construction of these prosthetics and the considerations which guide their implementation.

  12. Contact replacement for NMR resonance assignment.

    Science.gov (United States)

    Xiong, Fei; Pandurangan, Gopal; Bailey-Kellogg, Chris

    2008-07-01

    Complementing its traditional role in structural studies of proteins, nuclear magnetic resonance (NMR) spectroscopy is playing an increasingly important role in functional studies. NMR dynamics experiments characterize motions involved in target recognition, ligand binding, etc., while NMR chemical shift perturbation experiments identify and localize protein-protein and protein-ligand interactions. The key bottleneck in these studies is to determine the backbone resonance assignment, which allows spectral peaks to be mapped to specific atoms. This article develops a novel approach to address that bottleneck, exploiting an available X-ray structure or homology model to assign the entire backbone from a set of relatively fast and cheap NMR experiments. We formulate contact replacement for resonance assignment as the problem of computing correspondences between a contact graph representing the structure and an NMR graph representing the data; the NMR graph is a significantly corrupted, ambiguous version of the contact graph. We first show that by combining connectivity and amino acid type information, and exploiting the random structure of the noise, one can provably determine unique correspondences in polynomial time with high probability, even in the presence of significant noise (a constant number of noisy edges per vertex). We then detail an efficient randomized algorithm and show that, over a variety of experimental and synthetic datasets, it is robust to typical levels of structural variation (1-2 AA), noise (250-600%) and missings (10-40%). Our algorithm achieves very good overall assignment accuracy, above 80% in alpha-helices, 70% in beta-sheets and 60% in loop regions. Our contact replacement algorithm is implemented in platform-independent Python code. The software can be freely obtained for academic use by request from the authors.

  13. Trenchless Replacement of Buried Cable Lines

    Directory of Open Access Journals (Sweden)

    Hans-Joachim Bayer

    2007-01-01

    Full Text Available An enormous amount of underground electricity and telecommunication cables have been worn over the time with technical defects or need capacity increases. Thus, new lines need to be installed. In urban areas, even in smaller communities and in natural reserves, open trenching is difficult and often not permitted.In response, new patented methods of trenchless cable replacement using the HDD equipment have been developed by the TT Group. The new technology is called “Wash-over-cable-replacement” and applies specially designed drill heads, cutting around the old cable string in various configurations (completely closed, U-shape or S-shape embracing, depending to the coating type of the old cable. This special cable replacement drill head separates the cable from the surrounding adhesive soil or the sand bedding by creating a very small annular space around the cable thus enabling the pulling or dragging out of the old cable section between the start and the exit pit. After the old cable has been loosened from the surrounding soil by means of the wash over process and pulled out, the new cable can be smoothly pulled into the void using the drill rods and embedding the new cable in a rich bed of Bentonite.The wash-over drill heads are slim and have inner and outer nozzles for Bentonite and bits to handle roots, pebbles, gravel and the like. These drill heads perform very quickly (up to 3 meters per minute to effectively wash over existing cables without damaging the cable coating and prepare the ground for a fast new laying of a new cable in the existing line. Network owners also benefit from the fact that new geodetic or topographic surveys and documentations of the new cable are not necessary. Only the documents, remarks, technical codes and existing geodetic data need to be updated.The paper will outline the technological background and include several practical job examples.

  14. Femoral component rotation in patellofemoral joint replacement.

    Science.gov (United States)

    van Jonbergen, Hans-Peter W; Westerbeek, Robin E

    2018-06-01

    Clinical outcomes in patellofemoral joint replacement may be related to femoral component rotation. Assessment of rotational alignment is however difficult as patients with isolated patellofemoral osteoarthritis often have trochlear dysplasia. The use of the medial malleolus as a landmark to guide rotation has been suggested. The purpose of our study was to evaluate this technique with regard to femoral component rotation, and to correlate rotation with clinical outcomes at one-year follow-up. Forty-one knees in 39 patients had patellofemoral joint replacement using the Zimmer Gender-Solutions patellofemoral prosthesis. Intraoperatively, we determined femoral component rotational alignment using an extramedullary rod aimed at the inferior tip of the medial malleolus. Postoperatively, we measured the angle between the femoral component and the anatomical transepicondylar axis using CT. The amount of rotation was correlated with clinical outcomes at one-year follow-up. Forty knees in 38 patients were available for one-year follow-up. Mean femoral component rotation relative to the anatomical transepicondylar axis was 1.4° external rotation (range, -3.8 to 5.7°). We found no statistically significant correlation between femoral component rotation and change from baseline KOOS subscales at one-year follow-up. Our findings show that when using the medial malleolus as a landmark to guide rotation, the femoral component of the patellofemoral prosthesis was oriented in external rotation relative to the anatomical transepicondylar axis in 80% of knees. Our study did not show a relation between the amount of external rotation and clinical outcomes. Level III. Copyright © 2018 Elsevier B.V. All rights reserved.

  15. Neonatal varicella pneumonia, surfactant replacement therapy

    Directory of Open Access Journals (Sweden)

    Mousa Ahmadpour-kacho

    2015-12-01

    Full Text Available Background: Chickenpox is a very contagious viral disease that caused by varicella-zoster virus, which appears in the first week of life secondary to transplacental transmission of infection from the affected mother. When mother catches the disease five days before and up to two days after the delivery, the chance of varicella in neonate in first week of life is 17%. A generalized papulovesicular lesion is the most common clinical feature. Respiratory involvement may lead to giant cell pneumonia and respiratory failure. The mortality rate is up to 30% in the case of no treatment, often due to pneumonia. Treatment includes hospitalization, isolation and administration of intravenous acyclovir. The aim of this case report is to introduce the exogenous surfactant replacement therapy after intubation and mechanical ventilation for respiratory failure in neonatal chickenpox pneumonia and respiratory distress. Case Presentation: A seven-day-old neonate boy was admitted to the Neonatal Intensive Care Unit at Amirkola Children’s Hospital, Babol, north of Iran, with generalized papulovesicular lesions and respiratory distress. His mother has had a history of Varicella 4 days before delivery. He was isolated and given supportive care, intravenous acyclovir and antibiotics. On the second day, he was intubated and connected to mechanical ventilator due to severe pneumonia and respiratory failure. Because of sever pulmonary involvement evidenced by Chest X-Ray and high ventilators set-up requirement, intratracheal surfactant was administered in two doses separated by 12 hours. He was discharged after 14 days without any complication with good general condition. Conclusion: Exogenous surfactant replacement therapy can be useful as an adjunctive therapy for the treatment of respiratory failure due to neonatal chickenpox.

  16. Replacement divider plate performance under LOCA loading

    International Nuclear Information System (INIS)

    Huynk, H.M.; MClellan, G.H.; Schneider, W.G.

    1997-01-01

    A primary divider plate in a nuclear steam generator is required to perform its partitioning function with a minimum of cross leakage, without degradation in operating performance and without loss of structural integrity resulting from normal and accident loading. The design of the replacement divider plate for normal operating conditions is discussed in some detail in reference 1 and 2. This paper describes the structural response of the replacement divider plate to the severe loading resulting from a burst primary pipe. The loads for which the divider plate structural performance must be evaluated are mild to severe differential pressure transients resulting from several postulated sizes and types of pipe break scenarios. In the unlikely event of a severe Loss of Coolant Accident (LOCA) the divider plate or parts thereof must not exit the steam generator nor completely block the outlet nozzle. For the milder LOCA loads, the integrity of the divider plate and seat bars must be maintained. Analysis for the milder LOCA loads was carried out employing a conservative approach which ignores the actual interaction between the structure and the primary fluid. For these load cases it was shown that the divider plate does not become disengaged from the seat bars. For the more severe pipe breaks, the thermal-hydraulic analysis was coupled iteratively with the structural analysis, thereby taking into account divider plate deformation, in order to obtain a better prediction of the behaviour of the divider plate. In this manner substantial reduction in divider plate response to the more severe LOCA loading was achieved. It has been shown that, for the case of a postulated large LOCA (100% reactor inlet header), the disengagement of the divider plate from the seat bars resulted in an opening smaller than 1% of the divider plate area. (author)

  17. Iterative-build OMIT maps: map improvement by iterative model building and refinement without model bias

    International Nuclear Information System (INIS)

    Terwilliger, Thomas C.; Grosse-Kunstleve, Ralf W.; Afonine, Pavel V.; Moriarty, Nigel W.; Adams, Paul D.; Read, Randy J.; Zwart, Peter H.; Hung, Li-Wei

    2008-01-01

    An OMIT procedure is presented that has the benefits of iterative model building density modification and refinement yet is essentially unbiased by the atomic model that is built. A procedure for carrying out iterative model building, density modification and refinement is presented in which the density in an OMIT region is essentially unbiased by an atomic model. Density from a set of overlapping OMIT regions can be combined to create a composite ‘iterative-build’ OMIT map that is everywhere unbiased by an atomic model but also everywhere benefiting from the model-based information present elsewhere in the unit cell. The procedure may have applications in the validation of specific features in atomic models as well as in overall model validation. The procedure is demonstrated with a molecular-replacement structure and with an experimentally phased structure and a variation on the method is demonstrated by removing model bias from a structure from the Protein Data Bank

  18. Neutron beam facilities at the replacement research reactor

    International Nuclear Information System (INIS)

    Kennedy, S.

    1999-01-01

    Full text: On September 3rd 1997 the Australian Federal Government announced their decision to replace the HIFAR research reactor by 2005. The proposed reactor will be a multipurpose reactor with improved capabilities for neutron beam research and for the production of radioisotopes for pharmaceutical, scientific and industrial use. The neutron beam facilities are intended to cater for Australian scientific needs well into the 21st century. In the first stage of planning the neutron Beam Facilities at the replacement reactor, a Consultative Group was formed (BFCG) to determine the scientific capabilities of the new facility. Members of the group were drawn from academia, industry and government research laboratories. The BFCG submitted their report in April 1998, outlining the scientific priorities to be addressed. Cold and hot neutron sources are to be included, and cold and thermal neutron guides will be used to position most of the instruments in a neutron guide hall outside the reactor confinement building. In 2005 it is planned to have eight instruments installed with a further three to be developed by 2010, and seven spare instrument positions for development of new instruments over the life of the reactor. A beam facilities technical group (BFTG) was then formed to prepare the engineering specifications for the tendering process. The group consisted of some members of the BFCG, several scientists and engineers from ANSTO, and scientists from leading neutron scattering centres in Europe, USA and Japan. The BFTG looked in detail at the key components of the facility such as the thermal, cold and hot neutron sources, neutron collimators, neutron beam guides and overall requirements for the neutron guide hall. The report of the BFTG, completed in August 1998, was incorporated into the draft specifications for the reactor project, which were distributed to potential reactor vendors. An assessment of the first stage of reactor vendor submissions was completed in

  19. Building air exhaustion device

    International Nuclear Information System (INIS)

    Suzuki, Seijiro.

    1995-01-01

    An opening is formed on the side wall of a building such as of a nuclear power plant, and a blow out panel is held (supported) by a clip for closing the opening. A large-diameter pipeline is connected at one end to the opening so as to cover the blow out panel, and immersed at the other end in a pool water. When a pipeline such as of main steam pipelines is ruptured in the building, high temperature and high pressure coolants are flown out from the ruptured port, and the pressure in the building is elevated. The blow out panel falls off from the side of the building by the elevation of the pressure in the building. Steams or compressed air discharged from the opening is introduced to the pool through the large diameter pipeline, then the steams are condensed by the pool water and radioactive materials contained in the condensed steams are kept in the pool water. Radioactive materials contained in the released compression air are also removed into the pool water. (I.N.)

  20. Nuclear reactor buildings

    International Nuclear Information System (INIS)

    Nagashima, Shoji; Kato, Ryoichi.

    1985-01-01

    Purpose: To reduce the cost of reactor buildings and satisfy the severe seismic demands in tank type FBR type reactors. Constitution: In usual nuclear reactor buildings of a flat bottom embedding structure, the flat bottom is entirely embedded into the rock below the soils down to the deck level of the nuclear reactor. As a result, although the weight of the seismic structure can be decreased, the amount of excavating the cavity is significantly increased to inevitably increase the plant construction cost. Cross-like intersecting foundation mats are embedded to the building rock into a thickness capable withstanding to earthquakes while maintaining the arrangement of equipments around the reactor core in the nuclear buildings required by the system design, such as vertical relationship between the equipments, fuel exchange systems and sponteneous drainings. Since the rock is hard and less deformable, the rigidity of the walls and the support structures of the reactor buildings can be increased by the embedding into the rock substrate and floor responsivity can be reduced. This enables to reduce the cost and increasing the seismic proofness. (Kamimura, M.)

  1. Noise, buildings and people

    Energy Technology Data Exchange (ETDEWEB)

    Croome, D J

    1977-01-01

    This book covers the physics of acoustics necessary to understand the analytical aspects of acoustical design and noise control in buildings. The major part is devoted to the problems of noise and man, and other chapters cover features of noise control in and around buildings. In an introduction, building environmental engineering is dealth with in general terms of architecture, creativity, systms design, etc. Aspects of the acoustical environment, noise sources in buildings, control of airborne and structure-borne noise and acoustical design techniques are covered in Part II. Items include: comfort, physiological response to noise and vibrations, noise criteria, human performance, speech communication, landscaped offices, sound generation by air-conditioning and heating equipment, building structure and noise attenuation, acoustical design. Part III gives some fundamentals of acoustics; mechanical vibration, wave motion, propagation of sound, structure-borne sound, behavior of sound in rooms, transmission of sound through structure. References include lists of British standards and booklets on health and safety at work.

  2. Building information deduced

    DEFF Research Database (Denmark)

    Tamke, Martin; Myrup Jensen, Morten; Beetz, Jakob

    2014-01-01

    In recent years, Building Information Models have become commonplace in building profession. The extensive use and increasing experience with BIM models offers new perspectives and potentials for design and planning. A recent stakeholder study conducted by the authors of this paper show that in p......In recent years, Building Information Models have become commonplace in building profession. The extensive use and increasing experience with BIM models offers new perspectives and potentials for design and planning. A recent stakeholder study conducted by the authors of this paper show...... that in practice models are no longer solely observed as culmination of knowledge in a 3d representation of future built structures, but as a source of information in itself. Experienced users of BIM want to Find Information within a model or across a set of these and Compare models in order to evaluate states...... of a model, differences in separate models or models from different point of time. Current BIM tools support both modes only in a rudimentary form. This paper discusses current modes of information query within and across BIM models, shows beneficial scenarios for building and planning practice through...

  3. MODELLING AND SIMULATION MATTERS UPON THE STATIC ANALYSIS OF A BUILDING

    Directory of Open Access Journals (Sweden)

    DUTA Alina

    2017-05-01

    Full Text Available The present paper puts forward a method applied to determine the static analysis and the stress of a two-level building, via an analysis with finite elements for building construction domain. Prior to this, we shall deal with a strategic issue, i.e. the achievement of a model with finite elements to validate the best approximation for the building structure. The method endorsed comes to replace the mathematical model, which is more complicated. However, a central issue that has to be dealt with before determining the displacements and the stress analysis is the achievement of the model with finite elements, as the best approximation of the building structure.

  4. Federal Existing Buildings Handbook for Net Zero Energy, Water, and Waste

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-14

    In 2015, the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE) defined zero energy buildings as "an energy-efficient building where, on a source energy basis, the actual annual delivered energy is less than or equal to the on-site renewable exported energy." This handbook is focused on applying the EERE definition of zero energy buildings to existing buildings in the federal sector. However, it is not intended to replace, substitute, or modify any statutory or regulatory requirements and mandates.

  5. Federal New Buildings Handbook for Net Zero Energy, Water, and Waste

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-14

    In 2015, the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE) defined zero energy buildings as "an energy-efficient building where, on a source energy basis, the actual annual delivered energy is less than or equal to the on-site renewable exported energy." This document is focused on applying EERE’s definition of zero energy buildings to federal sector new buildings. However, it is not intended to replace, substitute, or modify any statutory or regulatory requirements and mandates.

  6. Renewable Substitutability Index: Maximizing Renewable Resource Use in Buildings

    OpenAIRE

    Srinivasan, Ravi; Campbell, Daniel; Wang, Wei

    2015-01-01

    In order to achieve a material and energy balance in buildings that is sustainable in the long run, there is an urgent need to assess the renewable and non-renewable resources used in the manufacturing process and to progressively replace non-renewable resources with renewables. Such progressive disinvestment in the non-renewable resources that may be substituted with renewable resources is referred to as “Renewable Substitutability” and if implemented, this process will lead to a paradigm sh...

  7. Topology Optimization of Building Blocks for Photonic Integrated Circuits

    DEFF Research Database (Denmark)

    Jensen, Jakob Søndergaard; Sigmund, Ole

    2005-01-01

    Photonic integrated circuits are likely candidates as high speed replacements for the standard electrical integrated circuits of today. However, in order to obtain a satisfactorily performance many design prob- lems that up until now have resulted in too high losses must be resolved. In this work...... we demonstrate how the method of topology optimization can be used to design a variety of high performance building blocks for the future circuits....

  8. Byron G. Rogers Federal Building Harvests Daylight and Super Savings

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-01

    Case study describes how the Byron G. Rogers Federal Building replaced existing T12 and T8 luminaires with LED dedicated troffers with advanced controls. Together these measures cut lighting energy use by nearly 60% in the 18-story, 791,000-square-foot facility. The new lighting control system provides automated dimming of lights down to 0% output when daylight provides adequate light levels. The project earned GSA an award for exemplary performance from the Interior Lighting Campaign in 2016.

  9. Environmental Assessment for Demolition of Buildings 5303 and 5312

    Science.gov (United States)

    2013-06-01

    Land Use ANSI S3.23-1980. Committee on Hearing, Bioacoustics and Biomechanics . 1981. Assessment of Community Noise Response to High-Energy...entirely renovated since its original construction. In 1950, a covered platform, stair , and door were added to the northeast side of the building. Several...transformation into the housing office. A replacement for the rear entrance porch and stairs , with an awning, was completed in 1995; new windows and

  10. Renovation of the facades of buildings 11, 12, 13 and 14

    CERN Multimedia

    TS/FM Group

    2005-01-01

    Restoration work on the facades of Buildings 11, 12, 13 and 14 will begin on 6 June 2005 and is scheduled to be completed by the end of September. This work consists in replacing the windows of Building 14 and of the eastern facade of Building 13, and in repairing the windows of Buildings 11 and 12 and of the northern facade of Building 13. The concrete parts which have suffered carbonation damage will also be repaired. During this period, parking around these buildings will be restricted for safety reasons and for the requirements of the work site. All people working in these buildings or in their direct vicinity are kindly requested to comply with the signs in place. Thank you in advance for your understanding. TS/FM Group

  11. Renovation of the facades of buildings 11, 12, 13 and 14

    CERN Multimedia

    TS/FM group

    2005-01-01

    Restoration work on the facades of Buildings 11, 12, 13 and 14 will begin on 6 June 2005 and is scheduled to be completed by the end of September. This work consists in replacing the windows of Building 14 and of the eastern facade of Building 13, and in repairing the windows of Buildings 11 and 12 and of the northern facade of Building 13. The concrete parts which have suffered carbonation damage will also be repaired. During this period, parking around these buildings will be restricted for safety reasons and for the requirements of the work site. All people working in these buildings or in their direct vicinity are kindly requested to comply with the signs in place. Thank you in advance for your understanding. Group TS/FM

  12. Age replacement policy based on imperfect repair with random probability

    International Nuclear Information System (INIS)

    Lim, J.H.; Qu, Jian; Zuo, Ming J.

    2016-01-01

    In most of literatures of age replacement policy, failures before planned replacement age can be either minimally repaired or perfectly repaired based on the types of failures, cost for repairs and so on. In this paper, we propose age replacement policy based on imperfect repair with random probability. The proposed policy incorporates the case that such intermittent failure can be either minimally repaired or perfectly repaired with random probabilities. The mathematical formulas of the expected cost rate per unit time are derived for both the infinite-horizon case and the one-replacement-cycle case. For each case, we show that the optimal replacement age exists and is finite. - Highlights: • We propose a new age replacement policy with random probability of perfect repair. • We develop the expected cost per unit time. • We discuss the optimal age for replacement minimizing the expected cost rate.

  13. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  14. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Science.gov (United States)

    D'Emic, Michael D; Whitlock, John A; Smith, Kathlyn M; Fisher, Daniel C; Wilson, Jeffrey A

    2013-01-01

    Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days). Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size), and derived titanosaurs and diplodocoids independently evolved the highest known tooth replacement rates among archosaurs.

  15. Evolution of high tooth replacement rates in sauropod dinosaurs.

    Directory of Open Access Journals (Sweden)

    Michael D D'Emic

    Full Text Available BACKGROUND: Tooth replacement rate can be calculated in extinct animals by counting incremental lines of deposition in tooth dentin. Calculating this rate in several taxa allows for the study of the evolution of tooth replacement rate. Sauropod dinosaurs, the largest terrestrial animals that ever evolved, exhibited a diversity of tooth sizes and shapes, but little is known about their tooth replacement rates. METHODOLOGY/PRINCIPAL FINDINGS: We present tooth replacement rate, formation time, crown volume, total dentition volume, and enamel thickness for two coexisting but distantly related and morphologically disparate sauropod dinosaurs Camarasaurus and Diplodocus. Individual tooth formation time was determined by counting daily incremental lines in dentin. Tooth replacement rate is calculated as the difference between the number of days recorded in successive replacement teeth. Each tooth family in Camarasaurus has a maximum of three replacement teeth, whereas each Diplodocus tooth family has up to five. Tooth formation times are about 1.7 times longer in Camarasaurus than in Diplodocus (315 vs. 185 days. Average tooth replacement rate in Camarasaurus is about one tooth every 62 days versus about one tooth every 35 days in Diplodocus. Despite slower tooth replacement rates in Camarasaurus, the volumetric rate of Camarasaurus tooth replacement is 10 times faster than in Diplodocus because of its substantially greater tooth volumes. A novel method to estimate replacement rate was developed and applied to several other sauropodomorphs that we were not able to thin section. CONCLUSIONS/SIGNIFICANCE: Differences in tooth replacement rate among sauropodomorphs likely reflect disparate feeding strategies and/or food choices, which would have facilitated the coexistence of these gigantic herbivores in one ecosystem. Early neosauropods are characterized by high tooth replacement rates (despite their large tooth size, and derived titanosaurs and

  16. Automated model building

    CERN Document Server

    Caferra, Ricardo; Peltier, Nicholas

    2004-01-01

    This is the first book on automated model building, a discipline of automated deduction that is of growing importance Although models and their construction are important per se, automated model building has appeared as a natural enrichment of automated deduction, especially in the attempt to capture the human way of reasoning The book provides an historical overview of the field of automated deduction, and presents the foundations of different existing approaches to model construction, in particular those developed by the authors Finite and infinite model building techniques are presented The main emphasis is on calculi-based methods, and relevant practical results are provided The book is of interest to researchers and graduate students in computer science, computational logic and artificial intelligence It can also be used as a textbook in advanced undergraduate courses

  17. Buildings for advanced technology

    CERN Document Server

    Teague, E; Murday, James

    2015-01-01

    This book deals with the design and construction of buildings for nanoscale science and engineering research. The information provided in this book is useful for designing and constructing buildings for such advanced technologies as nanotechnology, nanoelectronics and biotechnology. The book outlines the technology challenges unique to each of the building environmental challenges outlined below and provides best practices and examples of engineering approaches to address them: • Establishing and maintaining critical environments: temperature, humidity, and pressure • Structural vibration isolation • Airborne vibration isolation (acoustic noise) • Isolation of mechanical equipment-generated vibration/acoustic noise • Cost-effective power conditioning • Grounding facilities for low electrical interference • Electromagnetic interference (EMI)/Radio frequency interference (RFI) isolation • Airborne particulate contamination • Airborne organic and chemical contamination • Environment, safety a...

  18. Intermittent heating of buildings

    Energy Technology Data Exchange (ETDEWEB)

    Kohonen, K

    1983-02-01

    Conditions for intermittent heating of buildings are considered both theoretically and experimentally. Thermal behaviour of buildings adn rooms in intermittent heating is simulated by a program based on the convective heat balance equation and by simplified RC-models. The preheat times and the heating energy savings compared with continuous heating are presented for typical lightweight, mediumweight and heavyweight classroom and office modules. Formulaes for estimating the oversizing of the radiator network, the maximum heat output of heat exchangers in district heating and the efficiency of heating boilers in intermittent heating are presented. The preheat times and heating energy savings with different heating control systems are determined also experimentally in eight existing buildings. In addition some principles for the planning and application of intermittent heating systems are suggested.

  19. Construction engineering and planning of buildings related to the EPR

    International Nuclear Information System (INIS)

    Kaercher, H.

    1995-01-01

    Among the site-independent unit buildings are the reactor building with annulus; building for safety systems with main control room; new fuel storage pit, emergency power unit, reactor auxiliaries, access building; conventional switchgear building, and the turbine building. All buildings housing safety-related systems are protected against external and internal influences. Among the design-determining external influences are earthquakes, explosion high-pressure wave and aircraft crash. Internal incidents are caused by failure of components and pipes. The most discussed incident in the connection is the failure of the reactor pressure vessel involving core melt release which is safely retained by special devices. Earlier 3D plant models made of plastic have been replaced by 3D CAE computer models. Thus the graphic data of CAD systems have been added to the immense amount of logistic programmes/process data chains. This leads to new planning tools which are able to safely process such amounts of data and at the same time notably reduce planning time and expense. The whole data processing concept is characterized by simple, consistent data structures according to a uniform data model. It enables continual treatment throughout all planning stages and data exchange through simple, uniformly structured interfaces. (orig./HP) [de

  20. RESRAD-BUILD verification

    International Nuclear Information System (INIS)

    Kamboj, S.; Yu, C.; Biwer, B. M.; Klett, T.

    2002-01-01

    The results generated by the RESRAD-BUILD code (version 3.0) were verified with hand or spreadsheet calculations using equations given in the RESRAD-BUILD manual for different pathways. For verification purposes, different radionuclides--H-3, C-14, Na-22, Al-26, Cl-36, Mn-54, Co-60, Au-195, Ra-226, Ra-228, Th-228, and U-238--were chosen to test all pathways and models. Tritium, Ra-226, and Th-228 were chosen because of the special tritium and radon models in the RESRAD-BUILD code. Other radionuclides were selected to represent a spectrum of radiation types and energies. Verification of the RESRAD-BUILD code was conducted with an initial check of all the input parameters for correctness against their original source documents. Verification of the calculations was performed external to the RESRAD-BUILD code with Microsoft Excel to verify all the major portions of the code. In some cases, RESRAD-BUILD results were compared with those of external codes, such as MCNP (Monte Carlo N-particle) and RESRAD. The verification was conducted on a step-by-step basis and used different test cases as templates. The following types of calculations were investigated: (1) source injection rate, (2) air concentration in the room, (3) air particulate deposition, (4) radon pathway model, (5) tritium model for volume source, (6) external exposure model, (7) different pathway doses, and (8) time dependence of dose. Some minor errors were identified in version 3.0; these errors have been corrected in later versions of the code. Some possible improvements in the code were also identified