WorldWideScience

Sample records for building project management

  1. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  2. Value Triangles in the Management of Building Projects

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2013-01-01

    The purpose of this paper is to investigate value triangles and their implementation in the management of building projects. The paper is based on results from a research project on space strategies and building values, which included a major case study of the development of facilities for Danish...... Broadcasting Corporation (DR) over time. The conventional iron triangle of quality, cost and schedule for project management is the theoretical starting point, but this is seen as mainly being related to process integrity in the construction stage. It is supplemented by a similar value triangle of cultural...... value, use value and quality of realization for product integrity, mainly for the design stage. Based on this framework an evaluation is made of the value management in six of DR’s building projects from the first around 1930 to the most recent – the new headquarters DR Byen finalised in 2009...

  3. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  4. Project quality management critical success factors for buildings

    CERN Document Server

    Low, Sui Pheng

    2014-01-01

    The book presents the development of the Construction Quality Assessment System (CONQUAS), Singapore’s de facto quality performance measurement system, explains the application of the Quality Management System (QMS) to manage CONQUAS and identifies 33 critical success factors (CSFs) for achieving high CONQUAS scores. Through CONQUAS, the reader benefits from understanding how the Singapore government developed and implemented the first objective system for measuring what many building professionals have perceived to be elusive quality standards in the construction industry. The book presents both the theoretical concepts as well as the practical aspects to achieving strategic Project Quality Management that is anchored on the CSFs to building best practices. To realistically reflect the practical aspects and challenging issues faced by stakeholders in the construction industry, questionnaire surveys were conducted with building professionals to distinguish the importance level and extent of adoption of the ...

  5. Nuclear New Build: Insights into Financing and Project Management

    International Nuclear Information System (INIS)

    Horst Keppler, Jan; Cometto, Marco; Kim, Sang-Baik; Sozoniuk, Vladislav; Rothwell, Geoffrey; Thompson, Orme; Savage, Chris; Mancini, Mauro; Leigne, Philippe; Bickford, Erica; Crozat, Matt

    2015-01-01

    Nuclear new build has been progressing steadily since the year 2000, with the construction of 94 new reactors initiated and 56 completed reactors connected to the grid. Among these new reactors are some of the first generation III/III+ reactors of their kind. Drawing on a combination of conceptual analysis, expert opinion and seven in-depth case studies, this report provides policy makers and stakeholders with an overview of the principal challenges facing nuclear new build today, as well as ways to address and overcome them. It focuses on the most important challenges of building a new nuclear power plant, namely assembling the conditions necessary to successfully finance and manage highly complex construction processes and their supply chains. Different projects have chosen different paths, but they nonetheless share a number of features. Financing capital-intensive nuclear new build projects requires, for example, the long-term stabilisation of electricity prices whether through tariffs, power purchase agreements or contracts for difference. In construction, the global convergence of engineering codes and quality standards would also promote both competition and public confidence. In addition, change management, early supply chain planning and 'soft issues' such as leadership, team building and trust have emerged over and again as key factors in the new build construction process. This report looks at ongoing trends in these areas and possible ways forward. (authors)

  6. Management Of Building Projects

    OpenAIRE

    Niko Majdandzic; Tadija Lovric; Vido Peric

    2006-01-01

    In this work we have shown the concept of logistic support in management in building production and in building of objects, which is realised in Enterprise resource Planning – ERP system ERPINSG, developed in Informatic firm Informatic engineering – ININ in Slavonski Brod, and in cooperation with scientists of catedra for informatics of Faculty of Mechanical Engineering and users from building firms.

  7. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  8. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  9. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  10. THE PROJECT MANAGEMENT OF INDUSTRIAL BUILDINGS REENGINEERING (RECONSTRUCTION AND COMPLETION

    Directory of Open Access Journals (Sweden)

    K. Kolesnikova

    2017-06-01

    Full Text Available Creative element fate of any activity may not fall to zero because of the turbulent environment in which these activities are carried out, always prevents this. Environment that makes each building unique, that is, provides the main basis of the project. When we are talking about complex construction, the share of the creative component becomes very significant. First and foremost, this is explained by the duration of the construction work, during which time to happen risk events. The article analyses the processes of construction from the point of view of their conformity to the concept of project activities. It is shown that with increasing degree of difficulty of construction or time of the last share of creative activities in the overall project grows. In recent times more and more widespread work on re-engineering complex systems, for example, building constructions. This means repair of the building, but not a simple repair with restoration of the original, incorporated in the design of building elements and their interfaces, and partial or full replacement of items that fail or are outdated, new ones require first, a new design of their structures and production technologies, as well as the design of the accessories for the installation and technology is reshaping the object. Combining the two above-mentioned factors of growth of the share of creative activities during the project management of the re-engineering of building structures: complexity and construction time, received a cognitive model of such growth. Introduced the concept of "reengineering in construction" as a combination of the processes of adjustment and worn or completion of unfinished buildings. It is proved that any re-engineering in construction is the project activities. Provisions are tested in a real reengineering of industrial buildings with a positive technical and economic effect.

  11. THE PROJECT MANAGEMENT OF INDUSTRIAL BUILDINGS REENGINEERING (RECONSTRUCTION AND COMPLETION

    Directory of Open Access Journals (Sweden)

    Katerina Kolesikova

    2017-05-01

    Full Text Available Creative element fate of any activity may not fall to zero because of the turbulent environment in which these activities are carried out, always prevents this. Environment that makes each building unique, that is, provides the main basis of the project. When we are talking about complex construction, the share of the creative component becomes very significant. First and foremost, this is explained by the duration of the construction work, during which time to happen risk events. The article analyses the processes of construction from the point of view of their conformity to the concept of project activities. It is shown that with increasing degree of difficulty of construction or time of the last share of creative activities in the overall project grows. In recent times more and more widespread work on re-engineering complex systems, for example, building constructions. This means repair of the building, but not a simple repair with restoration of the original, incorporated in the design of building elements and their interfaces, and partial or full replacement of items that fail or are outdated, new ones require first, a new design of their structures and production technologies, as well as the design of the accessories for the installation and technology is reshaping the object. Combining the two above-mentioned factors of growth of the share of creative activities during the project management of the re-engineering of building structures: complexity and construction time, received a cognitive model of such growth. Introduced the concept of "reengineering in construction" as a combination of the processes of adjustment and worn or completion of unfinished buildings. It is proved that any re-engineering in construction is the project activities. Provisions are tested in a real reengineering of industrial buildings with a positive technical and economic effect.

  12. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  13. Digital Handover of Data from Building Projects to Building Operation

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    pro-jects to building operation. This project started in 2004 with research and analyses fol-lowed by development of a proposal for client requirements and in 2005 a first test on a real construction project has been carried out. After revision of the requirements a second test will be started early...... and construction and on the other side in building opera-tion and facilities management. In Denmark the government has launched a development program called Digital Construction and one of the projects concerns specifying require-ments for building clients in relation to digital handover of data from construction...... by a consortium called DACaPo consisting of a building client/facilities manager, a consulting company, a contractor and a university institute. This paper presents some of the results from the project with the main focus on the initial research....

  14. Nuclear new build: Financing and project management

    International Nuclear Information System (INIS)

    Keppler, Jan Horst; Cometto, Marco

    2015-01-01

    As there are more nuclear power reactors under construction today than at any time in history, the authors present in a first part an economic and financial analysis comparing the respective exposure of gas-fired and nuclear power generation to electricity price uncertainty and examine the option of leaving the market in the case of a permanent fall in electricity prices. In a second part, the study more specifically addresses the financial risk associated with the development of a new nuclear project, taking into account not only uncertainty about the future evolution of prices but also about the cost of construction and operations, as well as the implications of different ratios of fixed cost to variable cost for bondholders and equity investors. The authors then address the issue of the management of new build projects and their supply chains, as the nuclear industry is undergoing a number of important developments with massive and discontinuous technological changes that are underway as generation II nuclear power plants (NPPs) are substituted by larger and more complex generation III/III+ plants. The loss of skill and human capital as engineers of the nuclear building boom of the 1970's and 1980's retire must also be factored in, as well as the reconfiguration of the global supply chain, which is driven both by new possibilities in data management, externalisation and logistics, and a secular shift of activity from the United States, Japan, Europe and Korea to China, Southeast Asia and the Middle East

  15. Building the Superconducting Super Collider, 1989-1993: The Problem of Project Management

    Science.gov (United States)

    Riordan, Michael

    2011-04-01

    In attempting to construct the Superconducting Super Collider, US particle physicists faced a challenge unprecedented in the history of science. The SSC was the biggest and costliest pure scientific project ever, comparable in overall scale to the Manhattan Project or the Panama Canal - an order of magnitude larger than any previous particle accelerator or collider project. Managing such an enormous endeavor involved coordinating conventional-construction, magnet-manufacturing, and detector-building efforts costing over a billion dollars apiece. Because project-management experience at this scale did not exist within the physics community, the Universities Research Association and the US Department of Energy turned to companies and individuals from the military-industrial complex, with mixed results. The absence of a strong, qualified individual to serve as Project Manager throughout the duration of the project was a major problem. I contend that these problems in its project management contributed importantly to the SSC's 1993 demise. Research supported by NSF Award No. 823296.

  16. Analysis of Factors Influencing Building Refurbishment Project Performance

    Science.gov (United States)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  17. A project management framework for enhanced productivity performance using building information modelling

    Directory of Open Access Journals (Sweden)

    Longhui Liao

    2017-09-01

    Full Text Available Although the Singapore government has mandated submissions of building plans in building information modelling (BIM format since July 2013, this does not yet seem to lead to enhanced productivity performance. BIM collaboration between designers and downstream contractors appears to remain inadequate. While many studies have been conducted on using BIM for better project outcomes, studies that relate BIM with the identification of non-value adding activities in the project lifecycle and the reduction of the resulting wastes are at infancy stage. This paper aims to propose a project management framework for enhancing the productivity of building projects in Singapore, which forms Phase I of an ongoing research project. A two-pronged approach is presented. Firstly, non-value adding activities in the current project delivery process that uses BIM partially in Singapore are identified by comparing the typical current process with full BIM-based processes; such activities are cut down after process transformation in terms of people, process, and technology. Secondly, time savings derived from reducing the wastes caused by these activities are quantified. The proposed framework was validated by a case study of a local residential project. It was concluded that this framework provides a valuable tool for project teams to enhance productivity performance.

  18. Analysis of Factors Influencing Building Refurbishment Project Performance

    Directory of Open Access Journals (Sweden)

    Ishak Nurfadzillah

    2018-01-01

    Full Text Available Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project’s performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs and complexity factors (CFs during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  19. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section on establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.

  20. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  1. Building Energy Management Systems BEMS, German contribution to the IEA research projects Annex 16 and 17. Building Energy Management System BEMS; deutscher Beitrag zu den IEA-Forschungsvorhaben Annex 16 und 17

    Energy Technology Data Exchange (ETDEWEB)

    Bach, H.; Stephan, W.; Madjidi, M. (Univ. Stuttgart, IKE, Abt. HLK (Germany)); Brendel, T.; Schneider, A. (Ingenieurbuero Dr. Brendel, Frankfurt am Main (Germany)); Ast, H.; Kellner, H. (IFB, Dr. R. Braschel GmbH, Stuttgart (Germany))

    1991-01-01

    As part of the IEA project Annex 16 and 17 Germany carries out the project Building Energy Management Systems (BEMS). With digital control systems energetic and low-cost operation of space hvac systems can be attained. The project aims at abolishing impediments to efficient use of energy. Potential savings are shown for three examples: A conventional heating system for an office building, a VAV system (circulating air, heating, cooling, washer humidifcation) for an office building and VAV systems (FWRG, heating, cooling, steam humidification) for an office building in compact design. (BWI).

  2. Continuous Briefing and User Participation in Building Projects

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    and the methods for user participation, identifies problem areas and point out possible improvements. The author has been actively involved in the project as deputy project director with re-sponsibility for the briefing process until spring 2005 and is now a researcher.......Briefing is not just about specifying needs as requirements but also about evaluating how well design pro-posals fulfill the needs and aspirations. Furthermore, briefing is not only about building design. Briefing starts at the pre-project stage to create a basis for the project decision...... into the building is required. A building project is often part of a change process of the organisation that is going to occupy the building, and this change process should be management carefully to reach a successful result. An important aspect of briefing is to manage the par-ticipation of the coming users...

  3. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  4. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  5. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    International Nuclear Information System (INIS)

    Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon

    2015-01-01

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  6. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chan-Joong [Parsons Brinckerhoff, Seoul 135-763 (Korea, Republic of); Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon [Department of Architectural Engineering, Yonsei University, Seoul 120-749 (Korea, Republic of)

    2015-09-15

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  7. Key performance indicators for project success on innovative building technology projects

    CSIR Research Space (South Africa)

    Mphahlele, Cathy

    2015-12-01

    Full Text Available unconventional building methods can only be deemed to satisfy by way of rational design or Agrèment certification”. Delivering projects through IBTs has introduced a construction environment that has different procurement, supply chain management, building...

  8. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  9. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    Directory of Open Access Journals (Sweden)

    Argaw Tarekegn Gurmu

    2016-09-01

    Full Text Available This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity.

  10. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  11. Water sustainable management for buildings Water sustainable management for buildings

    Directory of Open Access Journals (Sweden)

    Juan Arturo Ocaña Ponce

    2013-01-01

    Full Text Available This paper presents a literature review article that deals with how to manage water in build­ings, specifically in facility projects, in ways to save water during the use, maintenance and operation of the building. This work is aimed at architects, builders and developers, and may be helpful for decision-making in the planning and management of efficient water use in buildings.Este trabajo es un artículo de revisión relacionado con el manejo y gestión del recurso agua, particularmente en proyectos de edificaciones, con el fin de propiciar ahorro de agua durante el uso, mantenimiento y operación del inmueble. Este documento está dirigido a arquitectos, constructores y desarrolladores inmobiliarios y puede ser de gran utilidad para la toma de decisiones en la fase de planeación y de gestión del uso eficiente del agua en los edificios.

  12. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  13. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    Directory of Open Access Journals (Sweden)

    Voytolovskiy Nikolay

    2017-01-01

    Full Text Available This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment project risks were specified on the basis of interconnection of risk and project effectiveness. Risk management procedure at realization of the developer project was developed.

  14. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    OpenAIRE

    Gurmu, Argaw Tarekegn; Aibinu, Ajibade Ayodeji; Chan, Toong Khuan

    2016-01-01

    This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry...

  15. Recovery Act. Advanced Load Identification and Management for Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Yi [Eaton Corporation, Menomonee Falls, WI (United States); Casey, Patrick [Eaton Corporation, Menomonee Falls, WI (United States); Du, Liang [Eaton Corporation, Menomonee Falls, WI (United States); He, Dawei [Eaton Corporation, Menomonee Falls, WI (United States)

    2014-02-12

    In response to the U.S. Department of Energy (DoE)’s goal of achieving market ready, net-zero energy residential and commercial buildings by 2020 and 2025, Eaton partnered with the Department of Energy’s National Renewable Energy Laboratory (NREL) and Georgia Institute of Technology to develop an intelligent load identification and management technology enabled by a novel “smart power strip” to provide critical intelligence and information to improve the capability and functionality of building load analysis and building power management systems. Buildings account for 41% of the energy consumption in the United States, significantly more than either transportation or industrial. Within the building sector, plug loads account for a significant portion of energy consumption. Plug load consumes 15-20% of building energy on average. As building managers implement aggressive energy conservation measures, the proportion of plug load energy can increase to as much as 50% of building energy leaving plug loads as the largest remaining single source of energy consumption. This project focused on addressing plug-in load control and management to further improve building energy efficiency accomplished through effective load identification. The execution of the project falls into the following three major aspects; An intelligent load modeling, identification and prediction technology was developed to automatically determine the type, energy consumption, power quality, operation status and performance status of plug-in loads, using electric waveforms at a power outlet level. This project demonstrated the effectiveness of the developed technology through a large set of plug-in loads measurements and testing; A novel “Smart Power Strip (SPS) / Receptacle” prototype was developed to act as a vehicle to demonstrate the feasibility of load identification technology as a low-cost, embedded solution; and Market environment for plug-in load control and management solutions

  16. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  17. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    Science.gov (United States)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  18. Building Information Management as a Tool for Managing Knowledge throughout whole Building Life Cycle

    Science.gov (United States)

    Nývlt, Vladimír; Prušková, Kristýna

    2017-10-01

    BIM today is much more than drafting in 3D only, and project participants are further challenging, what is the topic of both this paper, and further research. Knowledge of objects, their behaviour, and other characteristics has high impact on whole building life cycle. Other structured and unstructured knowledge is rightfully added (e.g. historically based experience, needs and requirements of users, investors, needs for project and objects revisions) Grasping of all attributes into system for collection, managing and time control of knowledge. Further important findings lie in the necessity of understanding how to manage knowledge needs with diverse and variable ways, when BIM maturity levels are advanced, as defined by Bew and Richards (2008). All decisions made would always rely on good, timely, and correct data. Usage of BIM models in terms of Building Information Management can support all decisions through data gathering, sharing, and using across all disciplines and all Life Cycle steps. It particularly significantly improves possibilities and level of life cycle costing. Experience and knowledge stored in data models of BIM, describing user requirements, best practices derived from other projects and/or research outputs will help to understand sustainability in its complexity and wholeness.

  19. Development of high-rise buildings: digitalization of life cycle management

    Directory of Open Access Journals (Sweden)

    Gusakova Elena

    2018-01-01

    Full Text Available The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  20. Development of high-rise buildings: digitalization of life cycle management

    Science.gov (United States)

    Gusakova, Elena

    2018-03-01

    The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  1. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  2. Refurbishment and school buildings management in a smart building environment

    Science.gov (United States)

    Di Giuda, Giuseppe Martino; Villa, Valentina; Tagliabue, Lavinia Chiara; Giana, Paolo Ettore; Rinaldi, Stefano; Ciribini, Angelo Luigi Camillo

    2018-05-01

    Building Information Modelling is a methodology, which is able to take into account many data, both geometrical and non-geometrical, in order to evaluate at the actual condition of the asset. The project has the scope of evaluating the conditions of different school buildings, in order to develop a way to choose the best-tailored management solution to the owner. A further step is the management and planning of design solutions during the life cycle customized on monitored buildings' conditions. The research work focuses on providing a support decisions concerning the gap between the present building state laws and the current state of the existing buildings. The process will be developed in an expanded BIM environment, using sensors, which will give back the state of the consistency of the actual conditions to enable the buildings to adapt themselves in the best way into their specific constraints and boundaries. The results of the study are (i) a complete workflow to make decision and the possibility to shape the decision process on an objective through a scientific approach, (ii) evaluate the current state of the asset and (iii) manage maintenance in the lifespan. Further development will take in consideration all the aspects related to management of big data environment generated by a smart buildings system.

  3. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  4. TERMINOLOGY MANAGEMENT FRAMEWORK DEVIATIONS IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2015-05-01

    Full Text Available The article reviews new approaches to managing projects deviations (risks, changes, problems. By offering integrated control these parameters of the project and by analogy with medical terminological systems building a new system for managing terminological variations in the projects. With an improved method of triads system definitions are analyzed medical terms that make up terminological basis. Using the method of analogy proposed new definitions for managing deviations in projects. By using triad integrity built a new system triad in project management, which will subsequently also analogous to develop a new methodology of deviations in projects.

  5. Impacts of building information modeling on facility maintenance management

    Energy Technology Data Exchange (ETDEWEB)

    Ahamed, Shafee; Neelamkavil, Joseph; Canas, Roberto [Centre for Computer-assisted Construction Technologies, National Research Council of Canada, London, Ontario (Canada)

    2010-07-01

    Building information modeling (BIM) is a digital representation of the physical and functional properties of a building; it has been used by construction professionals for a long time and stakeholders are now using it in different aspects of the building lifecycle. This paper intends to present how BIM impacts the construction industry and how it can be used for facility maintenance management. The maintenance and operations of buildings are in most cases still managed through the use of drawings and spreadsheets although life cycle costs of a building are significantly higher than initial investment costs; thus, the use of BIM could help in achieving a higher efficiency and so important benefits. This study is part of an ongoing research project, the nD modeling project, which aims at predicting building energy consumption with better accuracy.

  6. Laying the Foundations for a Knowledge Management Strategy in the Context of a Nuclear New-Build Project

    International Nuclear Information System (INIS)

    Bright, C.; Schifflers, J.-F.

    2016-01-01

    Full text: This paper outlines NuGen’s strategic framework for Knowledge Management that is currently being defined in support of the Moorside nuclear new build project in the United Kingdom. The strategic context is described along with an underpinning KM model, five step knowledge process, and oversight and governance arrangements that in combination seek to deliver integrated and sustainable management of critical knowledge assets throughout the plant’s lifecycle. (author

  7. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  8. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    OpenAIRE

    Voytolovskiy Nikolay; Trebukhin Anatoliy; Shoshinov Vitaly

    2017-01-01

    This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment projec...

  9. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  10. Building an Experiential Learning Model for a Project Management Course

    Science.gov (United States)

    Chen, Kuan C.; Chuang, Keh-Wen

    2009-01-01

    Teaching students to become project management professionals requires a real world experience. Incorporating live clients into student projects, instead of using case studies or mock companies, adds a dimension that exposes students to the realities of project management. This paper will describe a structured methodology used in a project…

  11. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk

  12. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    Science.gov (United States)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  13. Project Mapping to Build Capacity and Demonstrate Impact in the Earth Sciences

    Science.gov (United States)

    Hemmings, S. N.; Searby, N. D.; Murphy, K. J.; Mataya, C. J.; Crepps, G.; Clayton, A.; Stevens, C. L.

    2017-12-01

    Diverse organizations are increasingly using project mapping to communicate location-based information about their activities. NASA's Earth Science Division (ESD), through the Earth Science Data Systems and Applied Sciences' Capacity Building Program (CBP), has created a geographic information system of all ESD projects to support internal program management for the agency. The CBP's NASA DEVELOP program has built an interactive mapping tool to support capacity building for the program's varied constituents. This presentation will explore the types of programmatic opportunities provided by a geographic approach to management, communication, and strategic planning. We will also discuss the various external benefits that mapping supports and that build capacity in the Earth sciences. These include activities such as project matching (location-focused synergies), portfolio planning, inter- and intra-organizational collaboration, science diplomacy, and basic impact analysis.

  14. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  15. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  16. On Planning and Managing the Preservation of Historical Buildings

    Directory of Open Access Journals (Sweden)

    Č. Jarský

    2003-01-01

    Full Text Available The process of preserving and reconstructing historical buildings poses several specific questions and raises problems which must be solved in the planning and management stage of the building process - from questions of architectural and art-historical significance, via the future purpose of use of the building, links to the surrounding buildings, environmental questions, questions of cost, time analysis, and quality assurance problems. Many of these problems can be solved with the help of a computer model of the course of the rehabilitation and reconstruction of the building created by a construction technology network diagram. The CONTEC integrated project planning, management and quality control system based on these diagrams has been used for bidding, planning and managing the reconstruction process of several significant historical buildings in Prague and other cities.

  17. Managing Projects with the Public, -bringing Partnering, Contracts and Financing together in Building Public Services

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    of opportunity shows that on the operational level the contractual, financial and skill basis for the project has to be mobilized, negotiated, partly stabilized and renegotiated. The participating actors thus have to develop a new set of skills in dealing with municipalities and managing operations in PPPs....... of projects have had trouble to develop. The paper views PPP as an interaction between an emergent governance frame and operational activities in the project. PPP is an element of a networked public sector and the paper takes a network and political process approach to the shaping of PPP in Denmark....... It is analysed how the governance frame for these type of projects constituted a window of opportunity in the late nineties for “sale and lease back” arrangements, combined with partnering and more traditional design-build contracts. A case of a municipality renewing its school services, exploiting this window...

  18. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  19. Edificio project: A neuro-fuzzy approach to building energy management systems

    NARCIS (Netherlands)

    Galata, A.; Bakker, L.G.; Morel, N.; Michel, J.B.; Karki, S.; Joergl, H.P.; Franceschini, A.; Martinez, A.

    1998-01-01

    It is well known that building installations for indoor climate control, consume a substantial part of the total energy consumption and that at present these installations use much more energy than required due to inadequate settings and poor control and management strategies. European building

  20. Project management for small business: a streamlined approach from planning to completion

    National Research Council Canada - National Science Library

    Phillips, Joseph

    2012-01-01

    ... a Project Management Plan 81 72 Developing the Work Breakdown Structure 85 76 Selecting Your Project Management Software 83 65 CHAPTER 4: MANAGING PROJECT COSTS Building a Cost Management Frame...

  1. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  2. Management of projects for energy efficiency

    Directory of Open Access Journals (Sweden)

    Vuković Miodrag M.

    2014-01-01

    Full Text Available In an effort to lower operating costs and improve competitiveness, many organizations today are preparing projects in the field of energy saving. On the other hand, companies that provide energy services and implement these projects, need to build competences in this area to well manage the projects which are subject to energy savings and by this to justify the confidence of investors. This paper presents research that shows the most important factors for the development of local capacity in project management in the field of energy efficiency.

  3. Bellanca building, Yellowknife : building envelope retrofit project

    Energy Technology Data Exchange (ETDEWEB)

    Rajewski, G. [A.D. Williams Engineering Inc., Edmonton, AB (Canada)

    2008-07-01

    The Bellanca building is a ten-story, commercial office building, located in Yellowknife, Northwest Territories. The owner was concerned about annual fuel consumption, relative to other buildings of similar size. Tenants reported cold drafts and some ice build-up had been reported in the past, on the exterior of the cladding. In addition, some water penetration had occurred during rainfall. This presentation provided background information on the Bellanca building and discussed a building envelope retrofit project. A.D. Williams was hired in late 2006 in order to provide an opinion on the present condition of the building envelope. This presentation described the site investigation and presented an interior and exterior review of the building. It also presented a thermographic survey in order to map thermal anomalies and establish trends. Following acceptance of the report on findings, one of five options was selected for further development. This included removal of existing cladding, exterior gypsum wallboard, fiberglass insulation and application of BASF Walltite CT foam, sheathing, rigid insulation, drainage plane and new cladding. The preliminary design was then presented. This paper also described the tender and award of the contract; construction phase; and substantial completion of the project. tabs, figs.

  4. Integrated sustainable urban infrastructures in building projects

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Quitzau, Maj-Britt; Elle, Morten

    2007-01-01

    Current strategies in urban planning and development merely promote standardized building solutions, while failing to prioritize innovative approaches of integration between building projects and sustainable urban infrastructures. As a result of this, urban infrastructures – the urban veins...... – are outdated from a sustainability perspective. This paper looks into more holistic ways of approaching building projects and discuss whether this provide a basis for an increased integration of urban infrastructures within building projects. In our study, we especially emphasise how conventional ways...... of approaching building projects are influenced by lock-in of existing infrastructural systems and compare this with two examples of more holistic ways of approaching building projects, developed by two architecture firms. The paper points out that such holistic perspective in building projects provide...

  5. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  6. Lifecycle management for nuclear engineering project documents

    International Nuclear Information System (INIS)

    Zhang Li; Zhang Ming; Zhang Ling

    2010-01-01

    The nuclear engineering project documents with great quantity and various types of data, in which the relationships of each document are complex, the edition of document update frequently, are managed difficultly. While the safety of project even the nuclear safety is threatened seriously by the false documents and mistakes. In order to ensure the integrality, veracity and validity of project documents, the lifecycle theory of document is applied to build documents center, record center, structure and database of document lifecycle management system. And the lifecycle management is used to the documents of nuclear engineering projects from the production to pigeonhole, to satisfy the quality requirement of nuclear engineering projects. (authors)

  7. 324 Building liquid waste handling and removal system project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ham, J.E.

    1998-07-29

    This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan.

  8. Business Management in Sustainable Buildings: Ankara-Turkey Case

    Science.gov (United States)

    Kutay Karaca, Neşet; Burcu Gültekin, Arzuhan

    2017-10-01

    The concept of the sustainability is described as efficiently and effectively consuming of exhaustible and recyclable sources of the world. A sustainable building implements sustainability criteria in its life cycle, and business management is the process by which an organization uses its resources in the most efficient way to reach its goal. From the beginning, sustainable building proves their differences from the conventional buildings. Sustainable buildings are resource-efficient and environmentally responsible structures in terms of energy consumption, construction principles, siting, renovation and maintenance throughout its life cycle while conventional buildings are more traditional in these matters. The differences are observable especially in costs and expenditures. It is possible and feasible to compare and contrast the design, construction and management costs of both types of structures. Thence, contributions of sustainable buildings are priced favourably in terms of ecological and sociological aspects. In this context, a prospective projection can be made considering the extra costs of sustainable structures, as well as the consumption profits due to the use of less energy than conventional construction. Considering this, it is possible to project consumption savings in long term. By calculating a forward-looking net cash flow projection, it can be forecasted how much time it will take to cover the extra cost. When making decisions, investors always contemplate maximum profitability. Within the scope of this study, costs of sustainable and conventional buildings will be compared and contrasted through precedence of a sustainable building certificated and non-certificated building. It will be analysed in which time period the initial cost difference between them will be compensated totally and partially. Furthermore, an efficiency analyses will be done in the scope of the necessities and expenses of these businesses.

  9. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    : analysis of results of planning the project scope; study of templates of project works’ structures, recommendations for the formation of levels of structure; decomposition of the totality of project work; creating a dictionary of the project work structure; updating the description of the project scope and the project scope management plan. Practical importance. In order to improve the management of the scope of projects in the pharmacy, the components of subprocesses, participants, input and output documents are investigated and the algorithm for managing the project scope is built. It is determined that the starting elements of project scope management are the justification of the initial data, i.e. the project purpose, impacts of the environment and the internal potential of the enterprise in relation to the project implementation (assets of the organizational process. It is recommended to create a structure of project work starting from the analytical research existing at the enterprise or recommended by standards and guidelines on project management approaches to building a hierarchical structure of works, templates of project work structures. It is noted that the created structure of project work should be audited by participants of the project office. According to the results of planning the sequence and duration of operations for managing the scope of works, a precedence diagram of the investigated process is constructed. Value/originality. The developed recommendations regarding the consistency and structure of subprocesses and operations of the project scope management will allow the enterprise to significantly save time for planning the scope of subsequent projects, using the database created in previous periods, statistics on the implementation of the described operations.

  10. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    Science.gov (United States)

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  11. Management evolution in the LSST project

    Science.gov (United States)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  12. ESCO Project for Buildings of Government Agencies in Thailand

    Directory of Open Access Journals (Sweden)

    Prukvilailert Monchai

    2016-01-01

    Full Text Available In Thailand, Department of Alternative Energy Development and Efficiency (DEDE have organized the ESCO project to promote and encourage the use of machinery, materials and equipment having high efficiency for government buildings. ESCO company provides the invest and management for changing equipments in the buildings. In this paper, the evaluation of the project has been presented. The potential of electricity savings is about 77 million kwhr/year. It can reduce imports of crude oil about 6.58 thousand tons of crude oil (Ktoe/year. The budget to invest is BHT 1,504 million, with an average payback period of 4.85. However, we found that the establishment of the budget is the barriers. The recommendations and solutions using legal process have been presented to proceed the project in the future.

  13. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  14. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    Directory of Open Access Journals (Sweden)

    Ida Ayu Ari Brahmantariguna

    2016-07-01

    Full Text Available Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independent variables, i.e. Knowledge, skills and attitude and the success of the building construction project. Data was collected through a questionnaire survey. The sample/ respondents were the expertise in the field of building construction services those acts as a project manager. Data was analyzed  in three stages:first, factor analysis to reduce the variables into several groups of factors, that called as independent variables; second, correlation test with Pearson Correlation method to determine the correlation between independent variables  and dependent variable; lastly, perform multivariate regression analysis The results of factor analysis showed that the variables are formed into eleven groups, and the result of Pearson Correlation test showed only six groups correlated to project success, those are: Communication and Scope Management, Human Resource Management, which is part of knowledge; Leadership and Project Management, Professionalism and Issues Management as part of skill; and attitude concerning Responsibility, Vision and Priorities. The sixth group of these factors will be the independent variables in multivariate regression analysis. Based on multiple correlation test results, six independent variables simultaneously have a significant influence to the project success, proved by the result of probability value is 0,032.

  15. Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP-1131, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996. This QAPP has been developed specifically for the BCCP. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of decontaminating B-Cell and project related operations within the 324 Building as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations) are covered in the Building 324 QAPP. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping, and HSRCM-1, Hanford Site Radiological Control Manual, The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing, PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to 10 CFR 83 0.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be

  16. Factors Affecting Time, Cost and Quality Management in Building ...

    African Journals Online (AJOL)

    The study is an assessment of time, cost and quality management in the Nigerian construction industry, and it aims to explore time cost and quality management in the construction industry. The objective of the study is to identify factors affecting time; cost and quality management in building construction projects. This study ...

  17. The Woodworker's Website: A Project Management Case Study

    Science.gov (United States)

    Jance, Marsha

    2014-01-01

    A case study that focuses on building a website for a woodworking business is discussed. Project management and linear programming techniques can be used to determine the time required to complete the website project discussed in the case. This case can be assigned to students in an undergraduate or graduate decision modeling or management science…

  18. Management of metrology in measuring of the displacement of building construction

    Directory of Open Access Journals (Sweden)

    Jiří Kratochvíl

    2007-06-01

    Full Text Available The metrology management of the measurement of the displacement of building construction is not regulated in the standard ČSN ISO 73 0405 - Measurement of the displacement of building construction. But the metrology management has to be included in the project of measurement of the displacement (Stage of project. Then we have to pay an attention to the metrological management during this measurement (Stage of realization and during the evaluation of this measurement (Stage of evaluation. We have to insist on the subsequent improving of metrology management within the frame of the next project (so-called feedback. The metrology management in the measurement of the displacement during the stages should be based on an application of statutory instruments and technical standards. We should insist especially on the system of standards for the quality control ISO 9000. Considering specialities of geodetic measurements it is necessary to adapt the metrology management. That is why it will differ from the metrology management in other fields of knowledge. This paper includes some steps of metrological provision which must not be ignored.

  19. Building information models for astronomy projects

    Science.gov (United States)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  20. European project Educa-RUE: An example of energy efficiency paths in educational buildings

    International Nuclear Information System (INIS)

    Desideri, Umberto; Leonardi, Daniela; Arcioni, Livia; Sdringola, Paolo

    2012-01-01

    Highlights: ► European project aimed at improving energy performance in educational buildings. ► Development and updating of technical competence through training courses. ► Development of “Educa-RUE method”, a model of energy management for public buildings. ► Local Energy Plans, based on environmentally friendly criteria. ► Results obtained by testing and proving Educa-RUE method in different regional areas. -- Abstract: The aim of Educa-RUE project is to improve energy performance in building sector at local level and with particular attention to educational buildings, by promoting the ability of local players to guide and orient initiatives, designed to encourage energy saving by means of specific measures and integrated tools. The project is therefore focused to speed up the implementation of European Directive on Energy Performance in Buildings, EPBD (2002/91/EC), in Member States at local government level and to ensure its operability, within the various national legislations of reference. Educa-RUE lasted 30 months, from January 2008 to June 2010, and involved the following eight partners: for Italy, Provinces of Potenza (project leader), Perugia, Rieti and Palermo; for other Countries, Climate Energy Ltd. Essex and Energy Solutions North West London (UK), Associación Aragonesa de Entidades Locales ASAEL (Spain), Municipality of Prenzlau (Germany). A number of closely interconnected actions were carried on in eight Work Packages (WPs) to face the energy efficiency aspects identified as primary problems by the partners. The project developed a model process, known as “Educa-RUE method”, to assess possible policies of intervention on educational buildings, owned or managed by each Partner. In particular the Province of Perugia, leader of WP 2 and 5, provided guide lines and tools in order to: identify the state of the art of EPBD implementation and the main non-technological barriers, which are preventing its application at local level

  1. The influences of attributes, skills and knowledge of managers on refurbishment project performance

    Science.gov (United States)

    Ishak, Nurfadzillah

    2018-02-01

    Recently, the momentum on the growth of national building industry shows the increasing of the demand in refurbishment works becomes a trend spreading over the Malaysia. However, the potential of these activities normally related with the complexity in technical aspect compared to new build schemes. It will be reflecting on the unsatisfactory project performance. A competent manager is required to have the appropriate attributes, skills and knowledge in able to perform all the duties associated with managing the refurbishment building projects. Therefore, this paper is to identify the most appropriate attributes, skills and knowledge that required for managers to indicate the relationship between the influences on the refurbishment projects performance. This finding is indicate the importance of development the personal attributes, skills, and knowledge of managers and adds as benefit of raising the profile and image of managers in refurbishment building industry through a dissemination of the findings.

  2. Development of Occupational Safety and Health Requirement Management System (OSHREMS Software Using Adobe Dreamweaver CS5 for Building Construction Project

    Directory of Open Access Journals (Sweden)

    Abas Nor Haslinda

    2017-01-01

    Full Text Available The construction industry sector is considered as being risky with frequent and high accident rate. According to Social Security Organization (SOCSO, the construction accidents has arisen from time to time. Construction Industry Development Board (CIDB has developed the Safety and Health Assessment System in Construction (SHASSIC for evaluating the performance of a contractor in construction project by setting out the safety and health management and practices, however the requirement checklist provided is not comprehensive. Therefore, this study aims to develop a software system for facilitating OSH in building construction project, namely OSH requirements management system (OSHREMS, using Adobe Dreamweaver CS5 and Sublime Text as PHP editor. The results from a preliminary study which was conducted through interviews showed that, the respondents were only implementing the basic requirements that comply with legislations, with the absence of appropriate and specific guideline in ensuring occupational safety and health (OSH at the workplace. The tool will be benefits for contractors and other parties to effectively manage the OSH requirements for their projects based on project details.

  3. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  4. Building a Sustainable Project Management Capacity in Cyprus

    Science.gov (United States)

    Kelly, Steven J.; Esque, Timm J.; Novak, M. Mari; Cermakova, Anna

    2012-01-01

    The performance-driven project management program examined in this article was funded to support a variety of technical assistance efforts designed to strengthen the performance of small and medium enterprises in the Turkish Cypriot community in Cyprus. The customized program combined progressive workshops with hands-on and distance coaching by…

  5. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  6. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  7. The interdisciplinary nature of the skills needed by project managers

    Directory of Open Access Journals (Sweden)

    Trevor Nesbit

    Full Text Available The purpose of this paper is to explore and analyse the additional skills that are transferrable across different sectors, that project managers require and that go beyond technical project management skills to enable them to be successful in what is becoming an increasingly interdisciplinary role.The conclusions highlight that the project management role requires a range of non- technical project management skills and characteristics to enable project management to be carried out successfully. These non- technical project management skills and characteristics include the ability to build relationships with stakeholders; possessing formal project management certification; understanding the creation and functioning of project teams; understanding the political environment that the project exists in; the ability to work in a team; possessing leadership and management skills; possessing interpersonal and communication skills and possessing a strategic orientation.The skills and characteristics that are perceived by the cross section of project managers as being the most important are possessing interpersonal and communication skills; possessing leadership and management skills; the ability to work in a team and the ability to build relationships with stakeholders. Interpersonal and communication skills along with the ability to work in a team are not included significantly in job advertisements for project managers, with the requirement to have them potentially being assumed and not needed to be stated.This research provides a basis for a further study involving in-depth interviews with project managers from the information technology sector with the aim of highlighting specific projects where these additional skills have been vital to the success of these projects.Issues surrounding the political environment of the project from the perspective of different genders; the importance interpersonal and communication skills along with team work for

  8. General Managers' and building managers' different evaluation of building value and quality - as built and over time

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2007-01-01

    building. Furthermore, the respondents were asked to prioritize the quality factors. In the analysis the quality factors were grouped into cultural value and use value and into quality as built and over time. The paper presents the general results of the survey with focus on the differences between......This paper is one of the results of a research project on real estate strategies and building values based on a case study of the corporate buildings of DR (Danish Broadcasting Corporation). The paper presents some of the results from a questionnaire survey among select groups of managers in DR...... concerning their evaluation of 5 buildings. The overall purpose of the survey was to evaluate the different buildings’ values and quality, both as built and over time. A second purpose was to develop and test a methodology to describe the values and quality of buildings at a general but still differentiated...

  9. Application of Supply Chain Performance Measurement in Scor Model at Building Project

    OpenAIRE

    Wibowo, Mochamad Agung; Sholeh, Moh Nur

    2016-01-01

    The supply chain has become a priority subject of management research and manufacturing theory in recent years. It has also become an interesting topic in the construction industry. Construction supply chain management is more concerned with the coordination of discrete quantities of materials delivered to a specific construction project. Currently, in some building project, there has been no standard indicators in measuring the performance of the supply chain. Therefore, further research is ...

  10. Digitalization as Driver for Standardized Specification and Design of Buildings: In Search of an Efficient Building Design Management Methodology

    DEFF Research Database (Denmark)

    Treldal, Niels

    of this research is, therefore, to increase the understanding of the relation between information needs, standardisation and efficient design management. The research draws on findings from previous research on information management, design management and socio-technical science and focuses in particular......-value adding design iterations will occur too frequently if the variability is not carefully managed. Building a strong community within the design team is found to be critical to reduce variability as it allows project managers to entrust the team to find solutions and coordinate activities more efficiently...... standards were developed in the current research. An IDM package framework is proposed to make the current IDM methodology from buildingSMART more modular and easier to reuse and utilize on projects. A generic LOD framework is proposed to make the agreement on geometry information exchange more pragmatic...

  11. MANAGING THE BUILDING DESIGN PROCESS FOR SUSTAINABILTY AND IMPROVED QUALITY

    Directory of Open Access Journals (Sweden)

    Sunday Bobadoye

    2006-01-01

    Full Text Available The essence of building design process and management for building sustainability in the creation and maintenance of a qualitative architectural product is investigated in this paper. The design process, concept of building sustainability and particularly the quality of the built environment are discussed. Akure, a state capital in Nigeria was used as a case study. The principles and indicators for sustainability of buildings and its implications on the quality of the environment are examined in details. Survey findings include the views of the professionals on the clients, perception on the design process as well as management of projects, and the implications on the quality of the ensuring products and the city’s environment. The data were factor analyzed using varimax rotation criterion (with Kaiser Normalization. The results revealed that five factors were effective, with one of them exhibiting the greatest variability and individual differences. The variables that loaded on this factor were really the aspects of the process and management relating to the clients. The findings also revealed the professionals’ wrong attitude towards design process as shown with a very high degree of variability in the study. The paper concludes by recommending the enactment and enforcement of relevant policies with adequate education of the people and the involvement of all the stakeholders in the management of building projects and environmental programmes for the realization of a qualitative architectural product.

  12. Energy management systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lush, D. M.

    1979-07-01

    An investigation is made of the range of possibilities available from three types of systems (automatic control devices, building envelope, and the occupants) in buildings. The following subjects are discussed: general (buildings, design and personnel); new buildings (envelope, designers, energy and load calculations, plant design, general design parameters); existing buildings (conservation measures, general energy management, air conditioned buildings, industrial buildings); man and motivation (general, energy management and documentation, maintenance, motivation); automatic energy management systems (thermostatic controls, optimized plant start up, air conditioned and industrial buildings, building automatic systems). (MCW)

  13. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  14. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  15. Life management for a non replaceable structure: the reactor building

    International Nuclear Information System (INIS)

    Torres, V.; Francia, L.

    1998-01-01

    Phase 1 of UNESA N.P.P. Lifetime Management Project identified and ranked important components, relative to plant life management. The list showed the Reactor Containment Structure in the third position, and thirteen concrete structures were among the list top twenty. Since the Reactor Containment Building, together with the Reactor Vessel, is the only non-replaceable plant component, and has a big impact on the plant technical life, there is an increasing interest on understanding its behavior to maintain structural integrity. This paper presents: a) IAEA (International Atomic Energy Agency) Coordinated Research Program experiences and studies. Under this Program, international experts address the most frequent degradation mechanisms affecting the containment building. b) IAEA Aging Management Program adapted to our plants. The paper addresses the aging mechanisms affecting the concrete structures, reinforcing steel and prestress systems as well as the aging management programs and the mitigation and control methods. Finally, this paper presents a new module called STRUCTURES, included in phase 2 of the above mentioned project, which will monitor and document the different aging mechanisms and management programs described in item b) regarding the Reactor Containment Building (concrete liner, post stressing system, anchor elements). This module will also support the Maintenance Rule related practices. (Author)

  16. New build CANDU in Canada - development and application of information management systems for latest construction technology

    International Nuclear Information System (INIS)

    Asakura, S.; Akane, N.; Byrne, J.; Canas, B.; Kereliuk, S.; Akahori, S.

    2007-01-01

    In the wake of recent events representing growing nuclear energy interest in Canada, AECL and Hitachi are sharing each other's expertise as each company has its own unique and unrivalled capability in managing new build construction projects. This paper addresses some of the key strategies used to execute successfully a New CANDU build project, by focusing on recent developments and implementations in the construction and project management fields and by highlighting the use of cutting edge information technology. These strategies are designed to achieve and maximize their benefit to the New Build CANDU project team, to AECL/Hitachi as well as customers, partners and suppliers. (author)

  17. A Framework for BIM-enabled Life-cycle Information Management of Construction Project

    OpenAIRE

    Xu, n; Ma, Ling; Ding, Lieyun

    2014-01-01

    BIM has been widely used in project management, but on the whole the applications have been scattered and the BIM models have not been deployed throughout the whole project life-cycle. Each participant builds their own BIM, so there is a major problem in how to integrate these dynamic and fragmented data together. In order to solve this problem, this paper focuses on BIM- based life-cycle information management and builds a framework for BIM-enabled life-cycle information management. To organ...

  18. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  19. Information-representation methods and tools or the Smart Swap Building strategic project

    Directory of Open Access Journals (Sweden)

    Marco Medici

    2016-06-01

    Full Text Available  Within the Smart Swap Building project for the housing renewal, the representative tool is an integrated part of the building design process and becomes an element to support complex decision-making processes, integrating different skills in different stages of the building life cycle. The use of Building Information Modeling (BIM tools not only allow a transparent design phase but covers the whole building process, relating technological and structural elements with construction scheduling (4D, cost estimation (5D, certification (6D and management of the life cycle (7D + CAFM, allowing more sustainable and aware choices.

  20. Protocol to Manage Heritage-Building Interventions Using Heritage Building Information Modelling (HBIM

    Directory of Open Access Journals (Sweden)

    Isabel Jordan-Palomar

    2018-03-01

    Full Text Available The workflow in historic architecture projects presents problems related to the lack of clarity of processes, dispersion of information and the use of outdated tools. Different heritage organisations have showed interest in innovative methods to resolve those problems and improve cultural tourism for sustainable economic development. Building Information Modelling (BIM has emerged as a suitable computerised system for improving heritage management. Its application to historic buildings is named Historic BIM (HBIM. HBIM literature highlights the need for further research in terms of the overall processes of heritage projects, its practical implementation and a need for better cultural documentation. This work uses Design Science Research to develop a protocol to improve the workflow in heritage interdisciplinary projects. Research techniques used include documentary analysis, semi-structured interviews and focus groups. HBIM is proposed as a virtual model that will hold heritage data and will articulate processes. As a result, a simple and visual HBIM protocol was developed and applied in a real case study. The protocol was named BIMlegacy and it is divided into eight phases: building registration, determine intervention options, develop design for intervention, planning the physical intervention, physical intervention, handover, maintenance and culture dissemination. It contemplates all the stakeholders involved.

  1. FRG sealed isotopic heat sources project (C-229) project management plan

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1997-01-01

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  2. 23 CFR 710.313 - Design-build projects.

    Science.gov (United States)

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.313 Design-build projects. (a) In the case of a design-build project, right-of-way must be acquired and cleared in accordance with the Uniform Relocation Assistance...

  3. Knowledge transfer from facilities management to building projects: A typology of transfer mechanisms

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2012-01-01

    . The typology is divided in two parts, both based on mechanisms of knowledge push and knowledge pull. The first part has the main focus on the effectiveness of the building requirements and design by knowledge transfer from FM to building project from the front end. Briefing is a central element in this part....... The second part has the main focus on efficiency of building performance and operation by knowledge transfer from FM from the back end. Commissioning is a central element in this part. The typology consists of four mechanisms of front end knowledge transfer and four mechanisms of back end knowledge transfer....

  4. A Framework for BIM-Enabled Life-Cycle Information Management of Construction Project

    Directory of Open Access Journals (Sweden)

    Xun Xu

    2014-08-01

    Full Text Available BIM has been widely used in project management, but on the whole the applications have been scattered and the BIM models have not been deployed throughout the whole project life-cycle. Each participant builds their own BIM, so there is a major problem in how to integrate these dynamic and fragmented data together. In order to solve this problem, this paper focuses on BIM-based life-cycle information management and builds a framework for BIM-enabled life-cycle information management. To organize the life-cycle information well, the information components and information flow during the project life-cycle are defined. Then, the application of BIM in life-cycle information management is analysed. This framework will provide a unified platform for information management and ensure data integrity.

  5. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  6. Challenges in Delivering Green Building Projects: Unearthing the Transaction Costs (TCs

    Directory of Open Access Journals (Sweden)

    Queena K. Qian

    2015-03-01

    Full Text Available Delivering green building (GB projects involve some activities that are atypical in comparison with conventional buildings. Such new activities are characterized by uncertainty, and they incur hidden costs that have not been expected nor are they readily appreciated among the stakeholders. This paper develops a typology and chronology to examine the new activities that are associated with transaction costs (TCs in the real estate development process (REDP of green building. Through in-depth interviews with representatives from the major developers in Hong Kong who have experiences in GB practice, this study aims to unearth TCs involved at the critical stages of the REDP. Apart from reconfirming the early project planning stage as the most critical in the consideration of TCs, the study results also identified “extra legal liability risk of the GB product” as the major concern for any GB developer in Hong Kong. The key additional activities that bring significant TCs in developing GB are identified and compared to their traditional counterparts. In turn, project managers not only have to pursue overall cost management whilst winning more business, but they also have to pay particular attention to sustainability in order to minimize hidden societal costs. The study also provides a reference for governments and professionals that will aid in forming policy as well as advance the practice of the GB market by optimizing the societal costs.

  7. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  8. Project communication management in complex environments

    CERN Document Server

    Ying, Zhong

    2014-01-01

    This unique book that deals with project communication management in complex environments, taking a leaf from China’s experience with a major earthquake in Sichuan, would be a timely contribution to fill this lacuna. Readers would be able to understand how companies and organizations that are unprepared for crisis management would react to their detriment. The lessons provided in this book are the only one of its kind to highlight the lessons for companies and organizations to prepare themselves for successful project communication management through the complexity-informed framework. Although the book is written by two building professionals, the concepts and lessons presented are generic and equally applicable for businesses outside of the construction industry; for example, for airports, resorts, hotels, shipyards, etc.

  9. Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia

    Directory of Open Access Journals (Sweden)

    Jian Li

    2014-08-01

    Full Text Available Building Information Modelling (BIM is a process involving the creation and management of objective data with property, unique identity and relationship. In the Architecture, Engineering and Construction (AEC industry, BIM is adopted a lot in the lifecycle of buildings because of the high integration of information that it enables. Four-dimensional (4D computer-aided design (CAD has been adopted for many years to improve the construction planning process. BIM is adopted throughout buildings' lifecycles, in design, construction and operation. This paper presents five large-scale public and financial projects that adopt BIM in the design, construction and operational phases. Different uses of BIM are compared and contrasted in the context of the separate backgrounds. It is concluded that productivity is improved where BIM is used to enable easy sharing and integration of information and convenient collaboration.

  10. A quantitative analysis study on the implementation of partnering in the design and build construction project

    Science.gov (United States)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  11. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  12. Geomatics applied to building management

    International Nuclear Information System (INIS)

    Gascon, M.

    1998-01-01

    An integrated information system at an educational facility which has the capacity to monitor relative data pertaining to the spatial characteristics of a building was demonstrated. The system was instrumental in optimizing building management by making use of geomatics technology. Geomatics establishes relations between geo-reference data (plans) and an actual data base. Such a system has the capability to integrate and assess all data relative to building management. The information allows building managers to rationalize exploitation costs and to coordinate energy use with the activities in the building

  13. Decision-making in the Pre-design Stage of Sustainable Building Renovation Projects

    DEFF Research Database (Denmark)

    Gade, Anne Nørkjær; Jensen, Rasmus Lund; Larsen, Tine Steen

    2017-01-01

    There is a great potential in renovating our existing building stock, in terms of improving environmental, economic and social qualities. Meeting the increasing performance requirements for sustainable construction entails an increasing level of complexity in the design process of both new...... buildings and renovation projects. Decision support tools are one solution that can help the building owner manage this complexity. This study investigates the current decision-making processes among Danish professional building owners, in order to propose a conceptual framework for future decision support...... tools for sustainable renovation. Design Science Research Methodology has been used as the main methodological framework. Current practices for setting goals for sustainability, determining the current state of the buildings and prioritizing which buildings to renovate within a building portfolio, have...

  14. Job competencies for the malaysian consultant project managers

    Directory of Open Access Journals (Sweden)

    Dr. Ilias Said

    2009-12-01

    Full Text Available Architects, engineers and quantity surveyors are among the main players in construction.Coming from different background and professional background, these professionals bring in their own respective styles and methods of project management practices. There is now a body of opinion among industry people and academics alike that the industry needs to establish competency standard especially for project managers. Irrespective of their professional background, competent project managers should hypothetically deliver high quality services to the clients. A study was conducted at the School of Housing, Building and Planning, University of Science Malaysia (USM, to develop a job competence model for Consultant Project Managers (CPMs. It attempts to determine a set of minimum standards of skills and competencies for CPMs. This paper reports the findings of the study. It provides an insight into the type of competencies needed by CPMs based on the “Job Competence Model for Consultant Project Managers” developed from the study.

  15. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  16. Identification of coordination factors affecting building projects performance

    Directory of Open Access Journals (Sweden)

    Wesam Salah Alaloul

    2016-09-01

    Full Text Available Construction projects performance requires improvement to fulfil the complexity of the stakeholders’ needs and expectations. Coordination process is proposed as an efficient solution for weak performance of construction projects. Therefore, coordination factors are vital in ensuring a successful implementation of all project phases. This study aimed to identify and prioritise coordination factors that influence the performance of building projects in Malaysian context. A vast body of literature on coordination process was reviewed and resulted in 53 coordination factor. Three rounds of Delphi technique were conducted. The most effective coordination factors were ranked based on the Relative Importance Index (RII such as Scheduling (RII = 0.97, Quality assurance plan (RII = 0.93, and all parties’ participation in plans (RII = 0.89. These coordination factors have fulfilled the research gap and provided better management and higher performance for project parties. The results offer insightful perspectives to define the most effective coordination factors, for addressing the dependency between project tasks and the parties to enhance project performance.

  17. A basic framework for managing time of nuclear plant projects

    International Nuclear Information System (INIS)

    Beck, J.R.

    1987-01-01

    One of the crucial problems that faces managers of nuclear power plant projects is how to obtain more effective and efficient utilization of their company's resources. Analysis of this problem showed that improvement was necessary in the time management area. Time management is one of the primary functions of project groups. Much has been written about planning and scheduling, and there are many modern techniques (CPM, PERT, etc.) available to a project group to manage time. So, why is time management still a problem? One reason is that nuclear projects are generally very complex and involve many organizations requiring the same resources. It is the intent of this paper to present a comprehensive and basic framework on which to either build a time management system or use as a basis to assess an existing system

  18. Competence development organizations in project management on the basis of genomic model methodologies

    OpenAIRE

    Бушуев, Сергей Дмитриевич; Рогозина, Виктория Борисовна; Ярошенко, Юрий Федерович

    2013-01-01

    The matrix technology for identification of organisational competencies in project management is presented in the article. Matrix elements are the components of organizational competence in the field of project management and project management methodology represented in the structure of the genome. The matrix model of competence in the framework of the adopted methodologies and scanning method for identifying organizational competences formalised. Proposed methods for building effective proj...

  19. Interface agreement for the management of 308 Building Spent Nuclear Fuel. Revision 1

    International Nuclear Information System (INIS)

    Danko, A.D.

    1995-01-01

    The Hanford Site Spent Nuclear Fuel (SNF) Project was formed to manage the SNF at Hanford. Specifically, the mission of the SNF Project on the Hanford Site is to ''provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it for final disposition.'' The current mission of the Fuel Fabrication Facilities Transition Project (FFFTP) is to transition the 308 Building for turn over to the Environmental Restoration Contractor for decontamination and decommissioning

  20. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  1. EDF Energy Nuclear New Build: Lessons Learned in Knowledge Management

    International Nuclear Information System (INIS)

    Sachar, M.; Borlodan, G.

    2016-01-01

    Full text: EDF Energy Nuclear New Build (NNB) is building two EPR reactors at Hinkley Point C in Somerset in the United Kingdom that will provide reliable, low carbon electricity to meet approximately 7% of the UK’s electricity needs. The Hinkley Point C project is well advanced. It has achieved planning consent, design approval for the EPR reactor and a nuclear site license. There is a well-developed supply chain with identified preferred bidders who are already heavily involved in construction planning. Training for needed skills is underway and industrial agreements with trade unions are in place. NNB has the unique opportunity to set Knowledge Management behaviours, culture, and standards for the Hinkley Point C project from project inception instead of working to change them, such as on an operational site. (author

  2. The Undergraduate Student Instrument Project (USIP) - building the STEM workforce by providing exciting, multi-disciplinary, student-led suborbital flight projects.

    Science.gov (United States)

    Dingwall, B. J.

    2015-12-01

    NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that

  3. Building the future of healthcare. Part III: managing the build. Hospital leaders are moving forward using specialized IT tools to help them manage today's complex new-construction projects.

    Science.gov (United States)

    Lawrence, Daphne

    2010-05-01

    Hospital leaders are increasing making use of project management information systems (PMIS), which are built around documentation and communication of project-specific information. PMIS solutions are being applied to the daunting challenge of managing the large volumes of information involved in new construction projects. Project management tools usually utilize a portal. These tools can interface with administrative systems for best effect. CIOs and other senior executives emphasize that good leadership and execution are fundamental to success, and that automated project management tools are supports, not substitutes for good strategic planning and execution.

  4. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  5. An analysis of the demonstration projects for renewable energy application buildings in China

    International Nuclear Information System (INIS)

    Liu, Xingmin; Ren, Hong; Wu, Yong; Kong, Deping

    2013-01-01

    During the 2006–2008 period, there were 386 demonstration projects for renewable energy application buildings (REAB) organised by Chinese government, with a total area of approximately 40,420,000 m 2 . By the end of 2011, the vast majority of these projects had been completed and had passed the final acceptance. This paper analyses the measures taken by the Chinese government, including economic incentive mechanisms, organising agencies, application and evaluation systems, online monitoring platforms, acceptance inspections, assessment systems, standard criteria and so forth. This paper then evaluates the policy effects. The paper shows that there has been a satisfactory effect in the development of the REAB market, mobilising the enthusiasm of the government, equipment manufacturers and scientific research institutions, and promoting energy conservation. In addition, this paper analyses the suitability of different technological types in different climatic zones, which provides further guidance for the development of the REAB. Finally, based on the analyses of the problems met in the implementation of the demonstration projects, this paper proposes some policy suggestions concerning standard criteria, technological development, project management, incentive mechanisms and so on, to promote the development of the REAB more effectively in the future in China. - Highlights: • The policy measures to promote the development of renewable energy application buildings in China. • Evaluation of the demonstration policy effects in the market development and other aspects. • Analyses of the regional applicability for renewable energy application buildings in China. • Analyses of problems met in the implementation of the demonstration projects. • Put forward some policy suggestions on standard, technology, management, etc

  6. International cryospheric science capacity building and its role in policy and management

    Science.gov (United States)

    Wilson, A. M.; Armstrong, R. L.; Armstrong, B. R.; Barrett, A. P.; Brodzik, M. J.; Fetterer, F. M.; Fluri, J. L.; Hill, A. F.; Kayastha, R. B.; Khalsa, S. J. S.; Khan, A. L.; Miller, H. A.; Minbaeva, C.; Racoviteanu, A.; Raup, B. H.; Rittger, K.

    2017-12-01

    The USAID-funded Contribution to High Asia Runoff from Ice and Snow (CHARIS) project has operated since 2012 with dual goals of research and capacity building. The scientific goal is to quantify snowmelt and ice melt and is tackled in tandem with capacity building activities for partner institutions in eight countries across High Asia. We held project workshops covering topics such as snow and glacier melt modeling, remote sensing of snow and ice, hydrochemistry-based hydrograph separation, and data management. CHARIS also facilitated the start of the first glacier mass balance program in Afghanistan, the first water chemistry laboratory in Bhutan, and supported eight students from four countries in earning Masters of Science by Research in Glaciology degrees from Kathmandu University. Capacity building outcomes are tracked through surveys and interviews with project partners. This feedback, both quantitative and qualitative, improves our understanding of how skills fostered by CHARIS are translated into different workplace contexts and in different political settings. Through this feedback, we document how CHARIS collaborations promote analytical skill development and provide the benefit of improved communication among colleagues across borders in a region where resource management requires a trans-boundary approach. Additionally, we are gathering feedback from partners on ways their hydrology and glaciology research is translated to the policy and management realms. Partners anecdotally report a range of policy relationships, especially with respect to management strategies for water intensive developments such as hydropower and mining. Here we present findings from these surveys, which will guide future development-oriented, science-driven resource management projects. Such endeavors must be tailored to large regional differences in expertise, capacities, policy settings, and research infrastructures, and CHARIS demonstrates ways this can be done effectively.

  7. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  8. Building Real World Domain-Specific Social Network Websites as a Capstone Project

    Science.gov (United States)

    Yue, Kwok-Bun; De Silva, Dilhar; Kim, Dan; Aktepe, Mirac; Nagle, Stewart; Boerger, Chris; Jain, Anubha; Verma, Sunny

    2009-01-01

    This paper describes our experience of using Content Management Software (CMS), specifically Joomla, to build a real world domain-specific social network site (SNS) as a capstone project for graduate information systems and computer science students. As Web 2.0 technologies become increasingly important in driving business application development,…

  9. Are All We Need Heroes? -The New Role of the IT-Project Manager

    DEFF Research Database (Denmark)

    Tjørnehøj, Gitte; Jespersen, Andreas Saxkjær; von Moos, Theis

    2018-01-01

    . This paper investigates the new project manager role of balanced systems development by building a theoretically based framework and render it probable through two case studies. The paper describes the complexity of the new role and how it may lead to overload of the project manager. Solutions inspired...

  10. Knowledge Sharing Strategies for Large Complex Building Projects.

    Directory of Open Access Journals (Sweden)

    Esra Bektas

    2013-06-01

    complex nature of such projects has often been reported as a potential barrier to investing knowledge sharing. However, this analysis highlighted that the while the location is unique, the underlying challenges are typically not, and although projects are per definition temporary, these large, complex projects often last for a decade. Investing in knowledge sharing is therefore possible and worth the effort, and with respect to complexity more needed than those involved are aware of. In the second part of the empirical data analysis, the knowledge sharing strategies inuse in the two cases were examined. The first case represents a people-oriented approach using collocated open plan offices for the entire design team; the second case represents a tool-oriented approach drawing on a Building Information Model (BIM. The co-located offices provided the physical setting for knowledge sharing, but it not planned as a conscious strategy and so was mainly regarded as sharing the same office floor and was not used to its full potential. Physical boundaries remained between subteams and interaction was restricted to the level of project managers. In the second case, the implementation of a BIM represented a bottom-up and emergent strategy that embraced digital technologies for specific problems. The analysis showed that there was limited understanding about requirements and implication of changes in the design processes. Introduced through a bottom-up emergent strategy without commitment from all project partners, it was not possible to utilize the potential benefits of a BIM system for the overall design team. The analysis also revealed that what practitioners referred to as a BIM, was not a true BIM implementation, thereby indicating that digital concepts are still not completely clear in practice. This comparative analysis of two cases led to several conclusions: • Irrespective of whether a tool or people-oriented approach is used, there will be emerging strategies with which

  11. Value of Professional Property Managers in Residential Project Development

    Directory of Open Access Journals (Sweden)

    Yuen C. B.

    2016-06-01

    Full Text Available Property management has often been described as an after-sale service because the participation of professional property managers is only required upon completion of the building. Recently, however, property management has become an integral part of project development based on its value. These days, managing recreational facilities such as residents’ clubs, gyms and swimming pools, given the frequent use of electronic installations, no longer falls under basic caretaking services. The early detection of hidden problems such as poor quality concealed cables, conduits and pipes and the improper selection of building materials saves time and money in subsequent maintenance and repair work, simultaneously reducing any inconvenience experienced by end-users due to a breakdown in services or defective rectification.

  12. A Knotworking Guideline for Building Projects

    DEFF Research Database (Denmark)

    Rasmussen, Mai; Gade, Anne Nørkjær; Jensen, Rasmus Lund

    2017-01-01

    to collaborate occurs. The Finnish method, Knotworking AEC, emphasizes both collaboration and structure of building projects, which accommodates the lack of collaboration in the practices of the AEC sector. However, the recent development of Knotworking AEC implies a lack of written articles on Knotworking AEC...... experiments were analysed by practice theoretical methods. The result of this research is a Knotworking Guideline for Building Projects indicating both the phases, the participants and the tasks of each phase. The contribution of the resultlies in the conduction of a Knotworking session from both a practical...

  13. Unfavorable Communications Lead to Conflicts in Building Projects

    DEFF Research Database (Denmark)

    Ussing, Lene Faber; Wandahl, Søren

    2013-01-01

    The building industry in Denmark is accused of moving towards a conflict culture. The aim of this survey is, therefore, to investigate how the parties in the building industry experience this. The study answers the following two questions: Can unfavorable communications in a building project team...... of misunderstanding and conflicts depends on the way of communicating, and the degree of trust between the parties in a building project team depends on how familiar the parties are with each other. The results indicate that the building industry has to seek new ways of working together to obtain a better...... communication and more trust to each other....

  14. Managing Small Spacecraft Projects: Less is Not Easier

    Science.gov (United States)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

  15. Integrated Building Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Abstract: Building health management is an important part in running an efficient and cost-effective building. Many problems in a building’s system can go undetected...

  16. Capacity building for tropical coastal ecosystems management using a dynamic teaching model

    DEFF Research Database (Denmark)

    Lindberg, Annika Büchert; Nielsen, Thomas; Macintosh, Donald

    2008-01-01

    This learning opportunity illustrates effective capacity building through a dynamic teaching model that involves you and gives you personal experiences. The teaching model is easy to adapt to local environments and the learning opportunity is relevant to everyone working in coastal natural resource...... in combining knowledge and methods and applying these in a real life situation. Objectives: The participants will apply the acquired knowledge of ecosystems and project management tools when describing ecosystem services and when planning a project The participants will act as different stakeholders during...... the role play and hereby gain experience from a situation mimicking real life project situation.; The participants will experience how dynamic teaching can improve capacity building....

  17. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L., E-mail: m.freire.gormaly@utoronto.ca, E-mail: antonio.gittens@mail.utoronto.ca, E-mail: lavender.zhang@outlook.com [University of Toronto, Toronto, ON (Canada)

    2015-07-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  18. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    International Nuclear Information System (INIS)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L.

    2015-01-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  19. CONDITIONS OF SUSTAINABILITY OF INVESTMENT BUILDING PROJECTS BASED ON THE RISK MANAGEMENT CONCEPT

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2012-10-01

    minimization of risky situations requires reduction of the project implementation period; development of domestic methodologies and standards of project risk management tailored to the conditions of our construction industry is a relevant assignment.

  20. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  1. Application of Standard Project Management Tools to Research--A Case Study from a Multi-National Clinical Trial

    Science.gov (United States)

    Gist, Peter; Langley, David

    2007-01-01

    PRINCE2, which stands for Projects in Controlled Environments, is a project management method covering the organisation, management, and control of projects and is widely used in both government and commercial IT and building projects in the UK. This paper describes the application of PRINCE2 to the management of large clinical trials…

  2. Research projects and capacity building | Breen | Water SA

    African Journals Online (AJOL)

    ... by capacity building in the context of research projects. Based on this interpretation, reasonable and unreasonable expectations with respect to the extent to which capacity building can be achieved within a given project duration are discussed. A model is suggested, which would improve understanding and delivery and ...

  3. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  4. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    Science.gov (United States)

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  5. Port Graham Community Building Biomass Heating Design Project

    Energy Technology Data Exchange (ETDEWEB)

    Norman, Patrick [Port Graham Village Corporation, Anchorage, AK (United States); Sink, Charles [Chugachmiut, Anchorage, Alaska (United States)

    2015-04-30

    of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry has conducted two different field forest measurements of Native allotment lands and PGVC forest and timber lands. Lands deemed road accessible for biomass harvest were analyzed for this project. Forestry then conducted three different analyses and developed two reports to determine forest biomass on a tons per acre basis in addition to timber volume measurements taken for forest management purposes. Permits required were limited. For the biomass building, the Kenai Peninsula Borough did not require a permit. State of Alaska, Department of Public Safety, Division of Fire and Life Safety requires a plan review for fire and life safety requirements called an application for Fire and Life Safety Plan Review that would require a registered design professional to sign the document. State of Alaska State Forest Practices Act is required to be followed for any timber sale or harvest. This Act also requires consultation with Alaska Department of Fish and Game when operations are in close proximity or cross anadromous waters. Native allotment lands require following U. S. Bureau of Indian Affairs timber sale contracting process and approval.

  6. Quality of educational services in the field of Project management

    Directory of Open Access Journals (Sweden)

    Zlatko Barilović

    2013-12-01

    Full Text Available The growth and development of any business system depends on effectively and successfully implemented projects. Considering that the number of projects worldwide has been constantly increasing, developing project skills in individuals which will be involved in a project is of crucial importance. In the Republic of Croatia, the number of institutions offering education programmes in project management has been steadily growing. Each of these institutions will have to build its competitiveness on the marketing concept. Lately, the quality of educational services has been recognized as an increasingly important element of marketing. One of the education programmes in the field of project management in Croatia is the Specialist Graduate Professional Study Programme in Project Management offered at the Baltazar Adam Krčelić College of Business and Management in Zaprešić. In this paper the authors examine the competitiveness of the above education programme through a survey on the quality of educational service conducted in 2012 with a sample of 202 students with the aim of further defining the guidelines for improvement of its market competitiveness

  7. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  8. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  9. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  10. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  11. Demand Response Technology Readiness Levels for Energy Management in Blocks of Buildings

    Directory of Open Access Journals (Sweden)

    Tracey Crosbie

    2018-01-01

    Full Text Available Fossil fuels deliver most of the flexibility in contemporary electricity systems. The pressing need to reduce CO2 emissions requires new methods to provide this flexibility. Demand response (DR offers consumers a significant role in the delivery of flexibility by reducing or shifting their electricity usage during periods of stress or constraint. Blocks of buildings offer more flexibility in the timing and use of energy than single buildings, however, and a lack of relevant scalable ICT tools hampers DR in blocks of buildings. To ameliorate this problem, a current innovation project called “Demand Response in Blocks of Buildings” (DR-BoB: www.dr-bob.eu has integrated existing technologies into a scalable cloud-based solution for DR in blocks of buildings. The degree to which the DR-BoB energy management solution can increase the ability of any given site to participate in DR is dependent upon its current energy systems, i.e., the energy metering, the telemetry and control technologies in building management systems, and the existence/capacity of local power generation and storage plants. To encourage the owners and managers of blocks of buildings to participate in DR, a method of assessing and validating the technological readiness to participate in DR energy management solutions at any given site is required. This paper describes the DR-BoB energy management solution and outlines what we have called the demand response technology readiness levels (DRTRLs for the implementation of such a solution in blocks of buildings.

  12. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  13. Commercial Buildings Partnerships - Overview of Higher education projects

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Robinson, Alastair [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Regnier, Cindy [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-02-01

    The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits are designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.

  14. Capacity Building in Land Management

    DEFF Research Database (Denmark)

    Enemark, Stig; Ahene, Rexford

    2003-01-01

    There is a significant need for capacity building in the interdisciplinary area of land management especially in developing countries and countries in transition, to deal with the complex issues of building efficient land information systems and sustainable institutional infrastructures. Capacity...... building in land management is not only a question of establishing a sufficient technological level or sufficient economic resources. It is mainly a question of understanding the interdisciplinary and cross-sectoral nature of land administration systems, and understanding the need for human resource...... and professionals for implementing the new land policy. The curriculum combines the diploma and the bachelor level and it combines the key areas of land surveying, land management and physical planning....

  15. Building control. Technical building systems: Automation and management; Building Control. Technische Gebaeudesysteme: Automation und Bewirtschaftung

    Energy Technology Data Exchange (ETDEWEB)

    Kranz, H.R.; Baenninger, M.; Bieler, P.; Brettschneider, J.P.; Damnig, A.; Fassbender, H.W.; Friedrichs, K.; Gauchel, J.; Hegewald, B.; Kaelin, W.; Lezius, A.; Markert, H.; Oehler, A.; Otto, J.; Puettmer, M. Jr.; Rohrbacher, H.; Schuerdt, K.; Vogt, D.; Wittling, J.

    1995-12-31

    Cost-optimised management and maintenance of buildings can no longer be carried out without electronic data processing. The present anthology gives a comprehensive overview of the planning and operation of building automation systems. The following topics are discussed: ecological cooling and facade concepts, facility management, jeopardy alarm technology, building automation, communication technology, open communication and networks, building system technology, norms and directives, building right and law. A special abstract has been prepared for each of the 23 chapters. (BWI). 260 figs., 161 refs. [Deutsch] Kostenoptimiertes Management, Bewirtschaftung und Instandhaltung von Gebaeuden sind ohne EDV nicht mehr denkbar. Das vorliegende Buch gibt einen umfassenden Ueberblick ueber Planung und Betrieb von Gebaeudeautomationssystemen. Es wird dabei auf folgende Themenkomplexe eingegangen: Oekologische Kuehl- und Fassadenkonzepte; Facility Management, Gefahrenmeldetechnik, Gebaeudeautomation; Kommunikationstechnik, offenen Kommunikation und Netzwerke; Gebaeudesystemtechnik und Installationsbus; Energiemanagement; Betreibererfahrungen; Normen und Richtlinien; Baurecht und Gesetz. Fuer alle 23 Einzelkapitel wurde eine gesonderte inhaltliche Erschliessung durchgefuehrt. (BWI)

  16. Managing nuclear projects: a design agency experience in the design-build of waste management facilities in Canada

    International Nuclear Information System (INIS)

    Brewer, R.; Calzolari, L.

    2006-01-01

    Quality Assurance guarantees the quality of a product; it does not guarantee that it is a quality product. As procedures develop to satisfy QA programs and regulatory needs it is necessary to find ways to ensure that procedural management reinforces project management and does not detract from it. CANATOM NPM's experience in bidding for and executing the design or design and construction of nuclear waste management facilities demonstrates how design excellence and innovation can still be achieved while successfully managing the challenge of technical administration. The sourcing of expertise, the intricacies of design definition and the coordinating efforts required in the execution of the projects (one fully completed, the other into its engineering phase) will provide a valuable insight into the role and activities of an engineering company engaged in a 'Design Agency' (DA) role. (author)

  17. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  18. Building Space Management | Climate Neutral Research Campuses | NREL

    Science.gov (United States)

    , repurposing underused space and through the use of electronic media. Several space management principles can Building Space Management Building Space Management Building space represents one of the largest recruiting and successful acquisition of research funding. Learn more about how space management is necessary

  19. Occupancy-Based Energy Management in Buildings: Final Report to Sponsors

    Energy Technology Data Exchange (ETDEWEB)

    Sohn, Michael D.; Black, Douglas R.; Price, Phillip N.; Lin, Yiqing; Brahme, Rohini; Surana, Amit; Narayanan, Satish; Cerpa, Alberto; Ericson, Varick; Kamthe, Ankur

    2010-07-01

    The Lawrence Berkeley National Laboratory (LBNL), the University of California Merced (UCM), and the United Technologies Research Center (UTRC) conducted field studies and modeling analyses in the Classroom and Office Building (COB) and the Science and Engineering Building (S&E) at the University of California, Merced. In the first year, of a planned multiyear project, our goal was to study the feasibility and efficacy of occupancy-based energy management. The first-year research goals were twofold. The first was to explore the likely energy savings if we know the number and location of building occupants in a typical commercial building. The second was to model and estimate people movement in a building. Our findings suggest that a 10-14percent reduction in HVAC energy consumption is possible over typical HVAC operating conditions when we know occupancy throughout the building. With the conclusion of the first-year tasks, we plan to review these results further before this group pursues follow-on funding.

  20. DEVELOPMENT OF THE STATE SUPPORT FORMS PROJECTS IN INDUSTRIAL BUILDING

    Directory of Open Access Journals (Sweden)

    I. M. Meilanov

    2016-01-01

    Full Text Available Aim. The topicality of the research is stipulated by the objective necessity of the organizational and economic mechanism improvement of the state support projects of the industrial building. The aim of the research is the development of conceptual provisions and methodological foundations of financial projects creating conditions for economic growth of Russia based on the construction and putting into effect industrial objects.Methods. In the course of the research the system, subject-functional and structural approaches were implemented to solve the problems set widening the scope of the complex approach to assessment of the current operating mechanism of the state financial support of the projects and financial volume; to criteria stipulation of the most effective projects contest selection: to the search of the investment resources accumulation instrument into industrial building.Results. It is stipulated that state investment policy in industrial building mechanism oriented to define rational investment volumes and their branch, reproductive, technological and territorial structure; option of the building branch development priority; increase of the investment projects efficiency realization. The dynamics of the state support in the form of subsidies and budget investments into creation of the industrial building objects is analytically summarized. It is determined that the peculiarity of the modern state support projects of industrial building is transition from budget allocations distribution between branches and regions to selective and partial financing of specific investment projects on competitive basis. Some tactics of state and private partnership attracting private capital without losing strategic state control under systems and objects are defined. As an effective form of the industrial building support projects it is proposed to use a concession model form: projecting - building- financing- ownership - exploitation

  1. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1985-01-01

    Since 1980, Sandia National Laboratory has been designing and constructing Particle Beam Fusion Accelerator II. One managerial challenge of a large project is the problem of handling information. The scope of the PBFA-II projet may be gauged by its cost: $19.4 million for the accelerator itself, $9.5 million for buildings and standard utilities, and $9.6 million for specialized utilities and support systems. The first need of the project at its outset, then, was communication, and this remains a chief function of the CPO. If the nature or magnitude of the risk changes in any one area, the entire project team must know. If a design is changed, persons working on interdependent efforts must know. Some of this communication takes place naturally and informally. But project procedures must guarantee that all important communication is received by all necessary people, that the communication creates accountability, and that management receives timely, accurate reports. To put it another way, important communication requires project documentation. Documentation is both a record of the project and a tool for management

  2. Digital project management the complete step-by-step guide to a successful launch

    CERN Document Server

    Olson, Taylor

    2016-01-01

    The digital world is growing and changing at a rate that can seem overwhelming to those project managers who have to keep up with it to build customer-facing solutions and applications. It's rare for project managers working in this field to be provided with much direction or a process by which to carry out a project, and there has been next to nothing available specific to these types of projects in the literary marketplace. Digital Project Management: The Complete Step-by-Step Guide to a Successful Launch was developed to fill this gap by providing the knowledge, best practices and proven steps to consistently managing these types of project successfully from end-to-end now, and in the future with just minor adjustments to adapt to changes in technology.

  3. Agile Preparation within a Traditional Project Management Course

    Science.gov (United States)

    Landry, Jeffrey P.; McDaniel, Rachel

    2016-01-01

    Agile software approaches have seen a steady rise over a decade and a half, but agile's place in the information systems (IS) undergraduate curriculum is far from settled. While agile concepts may arguably be taught in multiple places in the IS curriculum, this paper argues for its inclusion in a project management course. This paper builds on…

  4. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  5. Integrated Design and Approach of Building Maintenance Management in the Built Environment

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2017-12-01

    Full Text Available Building maintenance is such a crucial aspect in the construction industry. The construction industry is characterized as a project-based industry that delivers one of a kind products and services. Thus, building maintenance can guarantee the safety of buildings including human health and property. To some extent, it plays as a guard to supervise the buildings protecting them being suffered collapse and deterioration. The most importantly, preparing for maintenance carried out on buildings is complex and it is related to procurement system dramatically, such as design-and-build, design-build-finance operate, and the private finance initiative and public/private partnerships, all of them need to give much consideration of operational and maintenance needs and costs which are ongoing.. This paper will focus on design and approach of building maintenance management in the construction industry.

  6. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  7. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  8. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    International Nuclear Information System (INIS)

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals

  9. Formation of electric energy managers for government buildings; Formacao de gerentes de energia para predios publicos

    Energy Technology Data Exchange (ETDEWEB)

    Jota, Patricia Romeiro da Silva; Freitas, Maria Eugenia de Almeida; Santos, Tarcisio Antonio dos [Centro de Educacao Tecnologica de Minas Gerais (CEFET-MG), Belo Horizonte (Brazil); Nobre, Eduardo Carvalhaes [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    2000-07-01

    This paper presents a joint methodology developed by professors of the CEFET - Minas Gerais and the CEMIG, within the Project for Efficient Buildings approved by the PROCEL. The objective of the Course of Manager of Energy in Public Buildings is to provide information and tools that helping the incorporation of modern techniques of rational using and the energy conservation in public buildings.

  10. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  11. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  12. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  13. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  14. STRATEGIC DECISION MAKING IN THE MANAGEMENT OF PROJECTS, AIMED AT THE BIM

    Directory of Open Access Journals (Sweden)

    Burneo Valarezo Servio

    2016-12-01

    Full Text Available Decision making in the management of projects aimed at Building Information Modeling, represents the main action to be developed during the development of the investment lifecycle, from inception to the development of life, decision marking is present in all phases of project management. In the Fund's shares of the production system by projects, decision making integrated from the priorities of the projects play an important role in the success of the company. The present work has as objective the development of a procedure for decision making during the life cycle of the project, the conditions for its implementation and the process for its development, with the purpose of raising their quality, to ensure decision making effective, consistent with the current development of the techniques of management.

  15. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  16. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  17. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  18. Project management methodology in the public and private sector: The case of an emerging market

    Directory of Open Access Journals (Sweden)

    Azamat Oinarov

    2017-03-01

    Full Text Available Application of project management methodologies in different countries is varied. The preference of a particular methodology largely depends on the specific features of a project management system in use. The aim of the paper is to draw the attention of project-involved readers to the need to develop, not a guide, but a specific project management methodology for projects in the public-private sector. The objective pursued by the paper is to provide useful recommendations for improving the existing methodologies on project management in the public-private sector. Kazakhstan’s experience in implementing project management methodologies in its public sector is sporadic while its private sector uses of modern methodologies build on external investor proven practices. At the background of the low exposure of the public sector to the best of project management methodologies, the paper reviews existing international project management methodologies and develops useful recommendations on the methodology, most suitable for a developing country’s public-private sector, on Kazakhstan’s example.

  19. Tall-Building Projects Sustainability Indicator (TPSI: A New Design and Environmental Assessment Tool for Tall Buildings

    Directory of Open Access Journals (Sweden)

    Hasim Altan

    2012-04-01

    Full Text Available The paper presents the features of Tall-building Projects Sustainability Indicator (TPSI—a “Sustainability Rating System” that specializes in tall-building projects. The system comprises two components; the “Technical Manual” in the form of a booklet and the “Calculator” in the form of an Excel tool. It can be used as a “design tool” and/or as a “checklist” to compare and to improve the sustainable performance of tall-building design schemes. At the same time, the system can be used to evaluate the sustainability of existing tall-building projects. The first version of the TPSI rating system (TPSI 2012 Version was released as an online tool (GreenLight and thoroughly examined and validated by multiple parties.

  20. Managing key capabilities: A challenge for nuclear plant building companies

    International Nuclear Information System (INIS)

    Pascal Corbel

    2003-01-01

    The nuclear plant building industry faces a paradoxical situation. The use of nuclear reactors to produce energy for civil purposes is both a promising technology, with potentially huge outlets, and a technology facing declining demand. One of the key problems is then: how to maintain the capabilities necessary to benefit from the potential recovery? The resource-based view of strategic management has shown the importance of different types of resources and capabilities in gaining a sustainable competitive advantage. Successful incumbents in the market of nuclear station building have built those kinds of distinctive capabilities that give them a competitive advantage over potential new entrants. But we show that, without a permanent activity in plant building, preserving those capabilities necessitates specific strategic action. We firstly develop the argument that the nuclear plant building industry is in a paradoxical situation in terms of demand and technical performance trends. Secondly, we try to identify the key capabilities of the incumbents. We show that companies in that field use mainly three types of distinctive capabilities: pure technical and scientific knowledge in direct relation to the use of nuclear as an energy generator, competences in risk management and competences in large project management, including financing. Thirdly, we show that although some of those capabilities are used through other nuclear-related activities such as plant maintenance or fuel supply, some of them necessitate taking strategic actions in order to be preserved. We argue that this should be a priority of nuclear equipment company managers in the next few years. (author)

  1. Re-designing project management : Steps towards a project management curriculum for a sustainable built environment

    NARCIS (Netherlands)

    Heintz, J.L.; Lousberg, L.H.M.J.; Prins, M.

    2015-01-01

    Sustainability concerns add a wide range of both stakeholders and performance expectations to building projects. The transition of a circular economy will also have a significant impact on the way in which building projects are carried out. This in addition to an already established escalation of

  2. Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements

    International Nuclear Information System (INIS)

    KLEM, M.J.

    2000-01-01

    In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while stored within the Canister Storage Building (CSB) occurred. The technical strategy is documented in Baseline Change Request (BCR) No. SNF-98-006, Simplified SNF Project Baseline (MCO Sealing) (FDH 1998). This BCR deleted the hot conditioning process initially adopted for the Spent Nuclear Fuel Project (SNF Project) as documented in WHC-SD-SNF-SP-005, Integrated Process Strategy for K Basins Spent Nuclear Fuel (WHC 199.5). In summary, MCOs containing Spent Nuclear Fuel (SNF) from K Basins would be placed in interim storage following processing through the Cold Vacuum Drying (CVD) facility. With this change, the needs for the Hot Conditioning System (HCS) and inerting/pressure retaining capabilities of the CSB storage tubes and the MCO Handling Machine (MHM) were eliminated. Mechanical seals will be used on the MCOs prior to transport to the CSB. Covers will be welded on the MCOs for the final seal at the CSB. Approval of BCR No. SNF-98-006, imposed the need to review and update the CSB functions and requirements baseline documented herein including changing the document title to ''Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements.'' This revision aligns the functions and requirements baseline with the CSB Simplified SNF Project Baseline (MCO Sealing). This document represents the Canister Storage Building (CSB) Subproject technical baseline. It establishes the functions and requirements baseline for the implementation of the CSB Subproject. The document is organized in eight sections. Sections 1.0 Introduction and 2.0 Overview provide brief introductions to the document and the CSB Subproject. Sections 3.0 Functions, 4.0 Requirements, 5.0 Architecture, and 6.0 Interfaces provide the data described by their titles. Section 7.0 Glossary lists the acronyms and defines the terms used in this document. Section 8.0 References lists the

  3. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  4. Solar Heating/Cooling of Buildings: Current Building Community Projects. An Interim Report.

    Science.gov (United States)

    National Academy of Sciences - National Research Council, Washington, DC. Building Research Advisory Board.

    Projects being carried out by the private sector involving the use of solar energy for heating and cooling buildings are profiled in this report. A substantial portion of the data were collected from a broad cross-section of the building community. Data collection efforts also involved the canvassing of the nearly 200 trade and professional…

  5. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  6. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  7. Building Theory for Management Science and Practice

    DEFF Research Database (Denmark)

    Sanchez, Ron; Heene, Aimé

    2017-01-01

    In this paper we examine some fundamental epistemological issues in building theory for applied management science, by which we mean theory that can be usefully applied in a scientific approach to management research and practice. We first define and distinguish “grand theory” from “mid......-range theory” in the social and management sciences. We then elaborate and contrast epistemologies for (i) building “grand theory” intended to be applicable to all cases and contexts, and (ii) building “mid-range theory” intended to apply to specific kinds of contexts. We illustrate the epistemological...... challenges in building grand theory in management science by considering important differences in the abilities of two “grand theories” in strategic management – industry structure theory and firm resources theory – to support development of conceptually consistent models and propositions for empirical...

  8. Project management in the public sector: a bibliometric analysis (1988-2014

    Directory of Open Access Journals (Sweden)

    Diego Honorato Clemente

    2017-06-01

    Full Text Available The importance of management of projects in the public sector has manifested itself as a governmental initiative which ensures and contributes to governance and focusses on transparency, accountability, the efficient and effective use of public resources, the implementation of policies and changes and, principally, on the maintenance of public trust. This being the case, the aim of this study is to present a bibliometric study about the management of projects in the public sector in order to identify publication trends and theoretical currents within this field. Data was gathered from the Web of Science Core Collection database and the software Sitkis and Ucinet were utilized to generate the networks. Descriptive and network analyses such as reference articles, co-citations and key words are presented. Findings suggest that management and execution methods of construction and infrastructure projects, such as Build-Operate-Transfer (BOT and Public-Private Partnerships, are relevant within the field of project management in the public sector.

  9. Design-Build-Finance in the US: The case of iROX, I-75 Road Expansion Project

    OpenAIRE

    Forcael,E; Ellis, JR,R; Jaramillo,F

    2011-01-01

    This project is part of the Interstate 75 road expansion, located in Southwest Florida and consisted of an expansion from four to six lanes along a 30-mile stretch. The paper presents a design, build and finance (DBF) approach applied to a US highway. This work focuses on the financial structure of the project, which did not include a concession (operation); the bidding procedure, which took into account an interesting bid evaluation criterion and; project management matters. The information ...

  10. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  11. Building Maintenance Management System for Heritage Museum

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2012-09-01

    Full Text Available An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, category, location, and ownership. This study focuses on Building Maintenance Management System for Heritage Museum, which consists of two case studies in Penang State Museum and Art Gallery, Malaysia and Museum of Perak, Malaysia. The aim of this study is to propose methods to improve the maintenance management system for heritage museum. From the results, the common problem occurs during the implementation for the maintenance of each building is the budget for the maintenance and worker’s skill. The department of each museum must have their own maintenance unit to keep an eye on the maintenance activities for their buildings in order to improve the maintenance management system in their building.

  12. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  13. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  14. A Fuzzy-Based Building Energy Management System for Energy Efficiency

    Directory of Open Access Journals (Sweden)

    José L. Hernández

    2018-01-01

    Full Text Available Information and communication technologies (ICT offer immense potential to improve the energetic performance of buildings. Additionally, common building control systems are typically based on simple decision-making tools, which possess the ability to obtain controllable parameters for indoor temperatures. Nevertheless, the accuracy of such common building control systems is improvable with the integration of advanced decision-making techniques embedded into software and energy management tools. This paper presents the design of a building energy management system (BEMS, which is currently under development, and that makes use of artificial intelligence for the automated decision-making process required for optimal comfort of occupants and utilization of renewables for achieving energy-efficiency in buildings. The research falls under the scope of the H2020 project BREASER which implements fuzzy logic with the aim of governing the energy resources of a school in Turkey, which has been renovated with a ventilated façade with integrated renewable energy sources (RES. The BRESAER BEMS includes prediction techniques that increase the accuracy of common BEMS tools, and subsequent energy savings, while ensuring the indoor thermal comfort of the building occupants. In particular, weather forecast and simulation strategies are integrated into the functionalities of the overall system. By collecting the aforementioned information, the BEMS makes decisions according to a well-established selection of key performance indicators (KPIs with the objective of providing a quantitative comparable value to determine new actuation parameters.

  15. Key Practice for Green Building Management In Malaysia

    OpenAIRE

    Aghili Nasim; Bin Mohammed Abdul Hakim; Sheau-Ting Low

    2016-01-01

    This paper identifies the management practices for green building management in Malaysia. A set of practices was ascertained from the reviewed of various established Green Building Standard in the world. Green building practices are significant role in attaining sustainability particularly in the construction industry. Green building is constructed for minimizing impacts to environment as well as decreasing building effects on occupants. To achieve the goals of green buildings, set of managem...

  16. Hawaii demand-side management resource assessment. Final report, Reference Volume 1: Building prototype analysis

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This report provides a detailed description of, and the baseline assumptions and simulation results for, the building prototype simulations conducted for the building types designated in the Work Plan for Demand-side Management Assessment of Hawaii`s Demand-Side Resources (HES-4, Phase 2). This report represents the second revision to the initial building prototype description report provided to DBEDT early in the project. Modifications and revisions to the prototypes, based on further calibration efforts and on comments received from DBEDT Staff have been incorporated into this final version. These baseline prototypes form the basis upon which the DSM measure impact estimates and the DSM measure data base were developed for this project. This report presents detailed information for each of the 17 different building prototypes developed for use with the DOE-21E program (23 buildings in total, including resorts and hotels defined separately for each island) to estimate the impact of the building technologies and measures included in this project. The remainder of this section presents some nomenclature and terminology utilized in the reports, tables, and data bases developed from this project to denote building type and vintage. Section 2 contains a more detailed discussion of the data sources, the definition of the residential sector building prototypes, and results of the DOE-2 analysis. Section 3 provides a similar discussion for the commercial sector. The prototype and baseline simulation results are presented in a separate section for each building type. Where possible, comparison of the baseline simulation results with benchmark data from the ENERGY 2020 model or other demand forecasting models specific to Hawaii is included for each building. Appendix A contains a detailed listing of the commercial sector baseline indoor lighting technologies included in the existing and new prototypes by building type.

  17. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  18. New Orleans Capacity Building Pilot Project

    Science.gov (United States)

    A series of meetings involving the Port of New Orleans and near-port community organizations were convened for a community capacity building pilot project. Technical assistance is being provided by EPA to support effective engagement.

  19. FREEWAT: an HORIZON 2020 project to build open source tools for water management.

    Science.gov (United States)

    Rossetto, Rudy; Borsi, Iacopo; Foglia, Laura

    2015-04-01

    FREEWAT is an HORIZON 2020 project financed by the EU Commission under the call WATER INNOVATION: BOOSTING ITS VALUE FOR EUROPE. FREEWAT main result will be an open source and public domain GIS integrated modelling environment for the simulation of water quantity and quality in surface water and groundwater with an integrated water management and planning module. FREEWAT aims at promoting water resource management by simplifying the application of the Water Framework Directive and other EU water related Directives. Specific objectives of the FREEWAT project are: to coordinate previous EU and national funded research to integrate existing software modules for water management in a single environment into the GIS based FREEWAT and to support the FREEWAT application in an innovative participatory approach gathering technical staff and relevant stakeholders (in primis policy and decision makers) in designing scenarios for the proper application of water policies. The open source characteristics of the platform allow to consider this an initiative "ad includendum" (looking for inclusion of other entities), as further research institutions, private developers etc. may contribute to the platform development. The core of the FREEWAT platform will be the SID&GRID framework in its version ported to the QGIS desktop. SID&GRID (GIS integrated physically-based distributed numerical hydrological model based on a modified version of MODFLOW 2005; Rossetto et al. 2013) is an open source and public domain modelling platform firstly developed within the EU-POR FSE 2007-2013 Regione Toscana - Italy and then ported to the QGIS desktop through a dedicated fund by Regione Toscana. SID&GRID will be complemented by June 2015 with solute transport (also density dependent) capabilities in aquifers within the MARSOL (2014) EU FPVII project. Activities will be mainly carried out on two branches: (i) integration of modules, so that the software will fit the end-users requirements, including

  20. Reorienting health services with capacity building: a case study of the Core Skills in Health Promotion Project.

    Science.gov (United States)

    Yeatman, H R; Nove, T

    2002-12-01

    This paper presents a case study of the application of a framework for capacity building [Hawe, P., King, L., Noort, M., Jordens, C. and Lloyd, B. (2000) Indicators to Help with Capacity Building in Health Promotion. NSW Health, Sydney] to describe actions aimed at building organizational support for health promotion within an area health service in New South Wales, Australia. The Core Skills in Health Promotion Project (CSHPP) arose from an investigation which reported that participants of a health promotion training course had increased health promotion skills but that they lacked the support to apply their skills in the workplace. The project was action-research based. It investigated and facilitated the implementation of a range of initiatives to support community health staff to apply a more preventive approach in their practice and it contributed to the establishment of new organizational structures for health promotion. An evaluation was undertaken 4 years after the CSHPP was established, and 2 years after it had submitted its final report. Interviews with senior managers, document analysis of written reports, and focus groups with middle managers and service delivery staff were undertaken. Change was achieved in the three dimensions of health infrastructure, program maintenance and problem solving capacity of the organization. It was identified that the critically important elements in achieving the aims of the project-partnership, leadership and commitment-were also key elements of the capacity building framework. This case study provides a practical example of the usefulness of the capacity building framework in orienting health services to be supportive of health promotion.

  1. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  2. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  3. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  4. GIS-HBIM INTEGRATION FOR THE MANAGEMENT OF HISTORICAL BUILDINGS

    Directory of Open Access Journals (Sweden)

    G. Vacca

    2018-05-01

    Full Text Available As is well known, Italy's very consistent buildings stock has become the major field for real estate investments and for the related projects and actions. It is a heritage that is often barely known and extremely complex, whose management has until now been addressed in a rather casual and uninformed manner, with unsatisfactory and sometimes disastrous outcomes. The situation is worse in the case of buildings of particular historical, artistic and architectural value so frequent within the heritage of our country. This paper shows the findings of an ongoing research which is aimed at structuring the cognitive process and assessing enhancement and re-functionalisation scenarios of our historical and architectural heritage through the use and integration of information systems such as BIM and the GIS. The work led to the development of a workflow able to integrate the contribution of the HBIM and GIS methodologies in the structuring and management of a wide range of digital data and information useful for its management. The research, focused on “La Gran Torre di Oristano, is aimed at creating the best conditions for an integrated and multidisciplinary strategy of requalification and refunctionalisation of historical and architectural heritage.

  5. Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.

  6. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  7. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  8. Knowledge management and information tools for building maintenance and facility management

    CERN Document Server

    Talamo, Cinzia

    2015-01-01

    This book describes the latest methods and tools for the management of information within facility management services and explains how it is possible to collect, organize, and use information over the life cycle of a building in order to optimize the integration of these services and improve the efficiency of processes. The coverage includes presentation and analysis of basic concepts, procedures, and international standards in the development and management of real estate inventories, building registries, and information systems for facility management. Models of strategic management are discussed and the functions and roles of the strategic management center, explained.  Detailed attention is also devoted to building information modeling (BIM) for facility management and potential interactions between information systems and BIM applications. Criteria for evaluating information system performance are identified, and guidelines of value in developing technical specifications for facility management service...

  9. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  10. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  11. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  12. A financing model to solve financial barriers for implementing green building projects.

    Science.gov (United States)

    Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.

  13. Risk management in architectural design control of uncertainty over building use and maintenance

    CERN Document Server

    Martani, Claudio

    2015-01-01

    This book analyzes the risk management process in relation to building design and operation and on this basis proposes a method and a set of tools that will improve the planning and evaluation of design solutions in order to control risks in the operation and management phase. Particular attention is paid to the relationship between design choices and the long-term performance of buildings in meeting requirements expressing user and client needs. A risk dashboard is presented as a risk measurement framework that identifies and addresses areas of uncertainty surrounding the satisfaction of particularly relevant requirements over time. This risk dashboard will assist both designers and clients. It will support designers by enabling them to improve the maintainability of project performance and will aid clients both in devising a brief that emphasizes the most relevant aspects of maintainability and in evaluating project proposals according to long-term risks. The results of assessment of the proposed method and...

  14. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  15. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  16. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  17. Review of selected contributions of the conference 'Project control in quality management systems'

    International Nuclear Information System (INIS)

    2008-04-01

    There were 12 contributions presented of the conference focused on the project management in quality management systems. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999. One contribution was focused on the project management in the project of preparation of finishing of the building of the Nuclear Power Plant Mochovce of 3. and 4. block and one contribution was focused on the amendment of the Atomic Act or on the preparation of the new Atomic Act with regard to duty of transposition of the Directive of the Council 2006/117/Euratom on control and supervision of the overseas transportations of radioactive waste and nuclear fuel burnt-up into legislation of the Slovak Republic

  18. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  19. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  20. Using accounting information systems by operations managers in a project company

    NARCIS (Netherlands)

    Wouters, Marc; van der Veeken, Henk J.M.

    2002-01-01

    This paper describes the results of a case study that investigated the use of accounting information by operations managers in a road building company. There was considerable preplanning before the execution of project activities, but task uncertainty during execution created the need to take

  1. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  2. Environmental management and monitoring for education building development

    Science.gov (United States)

    Masri, R. M.

    2018-05-01

    The purpose of research were (1) a conceptual, functional model designed and implementation for environmental management and monitoring for education building development, (2) standard operational procedure made for management and monitoring for education building development, (3) assessed physic-chemical, biological, social-economic environmental components so that fulfilling sustainable development, (4) environmental management and monitoring program made for decreasing negative and increasing positive impact in education building development activities. Descriptive method is used for the research. Cibiru UPI Campus, Bandung, West Java, Indonesia was study location. The research was conducted on July 2016 to January 2017. Spatial and activities analysis were used to assess physic-chemical, biological, social-economic environmental components. Environmental management and monitoring for education building development could be decreasing water, air, soil pollution and environmental degradation in education building development activities.

  3. A Financing Model to Solve Financial Barriers for Implementing Green Building Projects

    Science.gov (United States)

    Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379

  4. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  5. Development of a Training Program for Commercial Building Technicians

    Energy Technology Data Exchange (ETDEWEB)

    Rinholm, Rod

    2013-05-31

    This project focused on developing and deploying a comprehensive program of 22 training modules, including certification requirements, and accreditation standards for commercial building technicians, to help achieve the full savings potential of energy efficient buildings, equipment, and systems. This curriculum extended the currently available commercial building technician programs -- training a labor force in a growing market area focused on energy efficiency. The program helps to remove a major market impediment to low energy/zero energy commercial building system acceptance, namely a lack of operating personnel capable of handling more complex high efficiency systems. The project developed a training curriculum for commercial building technicians, with particular focus on high-efficiency building technology, and systems. In Phase 1, the project team worked collaboratively in developing a draft training syllabus to address project objectives. The team identified energy efficiency knowledge gaps in existing programs and plans and plans to address the gaps with either modified or new curricula. In Phase 2, appropriate training materials were developed to meet project objectives. This material was developed for alternative modes of delivery, including classroom lecture materials, e-learning elements, video segments, exercises, and hands-on training elements. A Certification and Accreditation Plan and a Commercialization and Sustainability Plan were also investigated and developed. The Project Management Plan was updated quarterly and provided direction on the management approaches used to accomplish the expected project objectives. GTI project management practices tightly coordinate project activities using management controls to deliver optimal customer value. The project management practices include clear scope definition, schedule/budget tracking, risk/issue resolution and team coordination.

  6. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  7. INTEGRATED DESIGN AND ENGINEERING USING BUILDING INFORMATION MODELLING: A PILOT PROJECT OF SMALL-SCALE HOUSING DEVELOPMENT IN THE NETHERLANDS

    Directory of Open Access Journals (Sweden)

    Rizal Sebastian

    2010-11-01

    Full Text Available During the design phase, decisions are made that affect, on average, 70% of the life-cycle cost of a building. Therefore, collaborative design relying on multidisciplinary knowledge of the building life cycle is essential. Building information modelling (BIM makes it possible to integrate knowledge from various project participants that traditionally work in different phases of the building process. BIM has been applied in a number of large-scale projects in the industrial real estate and infrastructure sectors in different countries, including The Netherlands. The projects in the housing sector, however, are predominantly small scale and carried out by small and medium enterprises (SMEs. These SMEs are looking for practical and affordable BIM solutions for housing projects. This article reports a pilot project of small-scale housing development using BIM in the province of Zeeland, The Netherlands. The conceptual knowledge derived from European and national research projects is disseminated to the SMEs through a series of experimental working sessions. Action learning protocols within a pilot project are developed to ensure direct impacts in terms of cost reduction and quality improvement. The project shows that BIM can be applied without radical changes to the SMEs' information and communication technology systems or to their business organizations. DOI: 10.3763/aedm.2010.0116 Source: Architectural Engineering and Design Management, Volume 6, Number 2, 2010 , pp. 103-110(8

  8. BIM-Based 4D Simulation to Improve Module Manufacturing Productivity for Sustainable Building Projects

    Directory of Open Access Journals (Sweden)

    Joosung Lee

    2017-03-01

    Full Text Available Modular construction methods, where products are manufactured beforehand in a factory and then transported to the site for installation, are becoming increasingly popular for construction projects in many countries as this method facilitates the use of the advanced technologies that support sustainability in building projects. This approach requires dual factory–site process management to be carefully coordinated and the factory module manufacturing process must therefore be managed in a detailed and quantitative manner. However, currently, the limited algorithms available to support this process are based on mathematical methodologies that do not consider the complex mix of equipment, factories, personnel, and materials involved. This paper presents three new building information modeling-based 4D simulation frameworks to manage the three elements—process, quantity, and quality—that determine the productivity of factory module manufacturing. These frameworks leverage the advantages of 4D simulation and provide more precise information than existing conventional documents. By utilizing a 4D model that facilitates the visualization of a wide range of data variables, manufacturers can plan the module manufacturing process in detail and fully understand the material, equipment, and workflow needed to accomplish the manufacturing tasks. Managers can also access information about material quantities for each process and use this information for earned value management, warehousing/storage, fabrication, and assembly planning. By having a 4D view that connects 2D drawing models, manufacturing errors and rework can be minimized and problems such as construction delays, quality lapses, and cost overruns vastly reduced.

  9. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  10. Home and Building Energy Management Systems | Grid Modernization | NREL

    Science.gov (United States)

    Home and Building Energy Management Systems Home and Building Energy Management Systems NREL researchers are developing tools to understand the impact of changes in home and building energy use and how researchers who received a record of invention for a home energy management system in a smart home laboratory

  11. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  12. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  13. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  14. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  15. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  16. Building Energy Management Open Source Software

    Energy Technology Data Exchange (ETDEWEB)

    2017-06-20

    This is the repository for Building Energy Management Open Source Software (BEMOSS), which is an open source operating system that is engineered to improve sensing and control of equipment in small- and medium-sized commercial buildings. BEMOSS offers the following key features: (1) Open source, open architecture – BEMOSS is an open source operating system that is built upon VOLTTRON – a distributed agent platform developed by Pacific Northwest National Laboratory (PNNL). BEMOSS was designed to make it easy for hardware manufacturers to seamlessly interface their devices with BEMOSS. Software developers can also contribute to adding additional BEMOSS functionalities and applications. (2) Plug & play – BEMOSS was designed to automatically discover supported load controllers (including smart thermostats, VAV/RTUs, lighting load controllers and plug load controllers) in commercial buildings. (3) Interoperability – BEMOSS was designed to work with load control devices form different manufacturers that operate on different communication technologies and data exchange protocols. (4) Cost effectiveness – Implementation of BEMOSS deemed to be cost-effective as it was built upon a robust open source platform that can operate on a low-cost single-board computer, such as Odroid. This feature could contribute to its rapid deployment in small- or medium-sized commercial buildings. (5) Scalability and ease of deployment – With its multi-node architecture, BEMOSS provides a distributed architecture where load controllers in a multi-floor and high occupancy building could be monitored and controlled by multiple single-board computers hosting BEMOSS. This makes it possible for a building engineer to deploy BEMOSS in one zone of a building, be comfortable with its operation, and later on expand the deployment to the entire building to make it more energy efficient. (6) Ability to provide local and remote monitoring – BEMOSS provides both local and remote monitoring

  17. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  18. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  19. Significance of Building Maintenance Management on Life-Span of Buildings

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2017-06-01

    Full Text Available The attentions and skills of maintenance are required for the construction of buildings in this twenty-first century. Because much architectural education is still focused on the one-of-a-kind assignment, encouraging the notion of personal fulfillment through leaving a mark for off-springs and obtaining a design award by means of concept drawings. Due to the reason that many building designers (architects, engineers, technicians are not encompassed in the subsequent maintenance of the building, they just regard it as other specialists’ responsibilities. In all likelihood, the building user-to-be has no formal role: the building contractors just fulfill their accountabilities to complete the building in compliance with the contract documents, not to care occupier’s needs and wants. This paper will focus on the important of building maintenance management on the life-span of buildings.

  20. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  1. Building Software with Gradle

    CERN Multimedia

    CERN. Geneva; Studer, Etienne

    2014-01-01

    In this presentation, we will give an overview of the key concepts and main features of Gradle, the innovative build system that has become the de-facto standard in the enterprise. We will cover task declaration and task graph execution, incremental builds, multi-project builds, dependency management, applying plugins, extracting reusable build logic, bootstrapping a build, and using the Gradle daemon. By the end of this talk, you will have a good understanding of what makes Gradle so powerful yet easy to use. You will also understand why companies like Pivotal, LinkedIn, Google, and other giants with complex builds count on Gradle. About the speakers Etienne is leading the Tooling Team at Gradleware. He has been working as a developer, architect, project manager, and CTO over the past 15 years. He has spent most of his time building software products from the ground up and successfully shipping them to happy customers. He had ...

  2. Marginal Productivity Gained Through Prefabrication: Case Studies of Building Projects in Auckland

    Directory of Open Access Journals (Sweden)

    Wajiha Shahzad

    2015-02-01

    Full Text Available Several studies have documented benefits of prefabrication system (prefab compared to the traditional building system (TBS. However, the documented benefits have been anecdotal or fragmented with reports of isolated case study projects. Few studies have looked at the objectively quantified benefits from statistical significance point of view and across building types in New Zealand. This study contributes to filling this knowledge gap by analyzing cost and time-savings, and productivity improvement achievable by the use of prefab in place of the TBS. Records of completion times and final contract values of 66 building projects implemented using prefab in Auckland were collected. The building types included commercial, houses, apartments, educational, and community buildings. The project details included final contract sums, completion dates, gross floor areas, and number of floors. Based on these details, the equivalent completion times and the final cost estimates for similar buildings implemented using the TBS were obtained from the Rawlinsons construction data handbook and feedback from some designers and contractors. Marginal productivity outcome for each building project was computed as the product of the cost and time-savings achieved using the prefab. Results showed that the use of prefab in place of TBS resulted in 34% and 19% average reductions in the completion times and costs, respectively. This also translated to overall 7% average improvement in the productivity outcomes in the building projects. Univariate ANOVA-based hypothesis test results showed that ‘building type’ had no significant effects on the cost and productivity improvement outcomes, but had significant effect on the time savings analyzed in the case study projects. The greatest productivity gain of 11% was achieved in house projects. These evidence-based results could guide optimized use of prefab for specific building application. The hypothesis-testing outcome

  3. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  4. RMS: a platform for managing cross-disciplinary and multi-institutional research project collaboration.

    Science.gov (United States)

    Luo, Jake; Apperson-Hansen, Carolyn; Pelfrey, Clara M; Zhang, Guo-Qiang

    2014-11-30

    Cross-institutional cross-disciplinary collaboration has become a trend as researchers move toward building more productive and innovative teams for scientific research. Research collaboration is significantly changing the organizational structure and strategies used in the clinical and translational science domain. However, due to the obstacles of diverse administrative structures, differences in area of expertise, and communication barriers, establishing and managing a cross-institutional research project is still a challenging task. We address these challenges by creating an integrated informatics platform to reduce the barriers to biomedical research collaboration. The Request Management System (RMS) is an informatics infrastructure designed to transform a patchwork of expertise and resources into an integrated support network. The RMS facilitates investigators' initiation of new collaborative projects and supports the management of the collaboration process. In RMS, experts and their knowledge areas are categorized and managed structurally to provide consistent service. A role-based collaborative workflow is tightly integrated with domain experts and services to streamline and monitor the life-cycle of a research project. The RMS has so far tracked over 1,500 investigators with over 4,800 tasks. The research network based on the data collected in RMS illustrated that the investigators' collaborative projects increased close to 3 times from 2009 to 2012. Our experience with RMS indicates that the platform reduces barriers for cross-institutional collaboration of biomedical research projects. Building a new generation of infrastructure to enhance cross-disciplinary and multi-institutional collaboration has become an important yet challenging task. In this paper, we share the experience of developing and utilizing a collaborative project management system. The results of this study demonstrate that a web-based integrated informatics platform can facilitate and

  5. Energy Conservation of the Designated Government Buildings in Thailand

    Directory of Open Access Journals (Sweden)

    Wangskarn Prapat

    2016-01-01

    Full Text Available The designated government buildings have implemented and administered energy program under the energy development and promotion Act 2007 for many years continuously until 2015. Appointment person responsible for energy, performing energy management and implementing the energy conservation work plan and measures are legal requirements for the designated buildings. Therefore, the ministry of Energy has launched the project to support the implementation of energy management. The aim of the project was to create the energy management system in the designated government buildings, and to reduce energy consumption. In this paper, the evaluation of the project has been presented from the achievements of 839 designated government buildings. The energy saving is more than 440 ktoe/year. This is about 3% of energy consumptions of buildings.

  6. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  7. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  8. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  9. Project management in health informatics.

    Science.gov (United States)

    Ho, Jessica

    2010-01-01

    This chapter gives an educational overview of: * the concept of project management and its role in modern management * the generic project lifecycle process * processes used in developing a plan for the management of resources - time, cost, physical resources and people * the concept of managing risk in projects * communication processes and practices that are important to the management of projects.

  10. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  11. Entrepreneurs skills for creating and managing IT projects

    OpenAIRE

    Sousa, M. J.; Almeida, M. R.

    2016-01-01

    This article we will analyze the concept of entrepreneurship and the importance of skills development for entrepreneurs to create and manage IT projects. The problem studied in this research was to identify skills for developing an IT culture of entrepreneurship and the main objective was to build a model of skills development for IT entrepreneurs. To accomplish this research it was developed a search of articles based on the keywords "entrepreneurship" and "skills of IT entrepreneurs”, the p...

  12. Management and financing of e-Government projects in India: Does financing strategy add value?

    Directory of Open Access Journals (Sweden)

    Shashank Ojha

    2017-06-01

    Full Text Available How do managers structure e-government projects and address challenges of risks, lack of technical expertise, and mitigation of strategic error for preventing loss of investments? Our aim was to compare the traditional finance approach and the strategy-driven, innovative financing approaches under the PPP model, to examine their managerial value-addition. We found that e-government projects require a carefully crafted structuring strategy and that innovative financing is more suitable in facilitating flexible decision making, building core capabilities, managing and sharing project risks, providing funds needed for growth and innovation, and customising tailor-made project governance strategy. Based on our findings, we develop five theoretical propositions.

  13. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  14. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  15. CONTEMPORARY TRENDS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ana Argirova

    2015-09-01

    Full Text Available The modern information society in ever increasing business projects and time limits to achieve the objectives at minimum cost leads to a search for ways to manage them. Today, more and more managers use IT tools for project management, and the term itself is associated with software solutions for the optimization and management of projects in different fields of human activity. The paper examines the main characteristics of project management by means of information technology. Key tasks and processes in the project implementation and management are discussed.

  16. Assessing and Developing the Application of LEED Green Building Rating System as a Sustainable Project Management and Market Tool in the Italian Context

    Directory of Open Access Journals (Sweden)

    Walaa S. E. Ismaee

    2016-07-01

    Full Text Available The paper discusses the recent introduction of the LEED system to the Italian context in order to assess its role to promote sustainable building process in the Italian context, pointing out its potentials on one hand as well as their gaps and limitations on the other hand, and suggests means for its future development. The study discusses the application of LEED as a ‘Sustainable Project management tool’ to guide sustainable building performance. This requires investigating the following: its structure, tools, assessment criteria along with its benchmarks and references. It also discusses the application of LEED as a ‘Sustainable building Certification and market tool’. This investigates the role and value of the LEED certification in the Italian Green market. The research method is comprised of three parts. The first part is a comparative analysis of LEED categories against Italian national initiatives for sustainability. The comparison showed that most LEED categories are already mandated by national norms and directives but they may differ in their stringency creating some areas of precedence of LEED system or drawbacks. This streamlines the adaptation process of LEED system to the Italian context. The second part investigates LEED projects’ market analysis. The result showed that the shift towards a sustainable building process is occurring slowly and on a vertical scale focusing on some building sectors rather than others. Its market diffusion in the Italian context faces challenges regarding the insufficient availability of green materials and products satisfying its requirements, as well as high soft cost of sustainability tests and expertise required. The Third part presents a practical review-citing the methodology and results of a survey conducted by the researchers in mid-2012. It is composed of a web-based questionnaire and interviews among a sample of LEED professionals in Italy. The result shows that LEED systems needs

  17. Housing Development Building Management System (HDBMS For Optimized Electricity Bills

    Directory of Open Access Journals (Sweden)

    Weixian Li

    2017-08-01

    Full Text Available Smart Buildings is a modern building that allows residents to have sustainable comfort with high efficiency of electricity usage. These objectives could be achieved by applying appropriate, capable optimization algorithms and techniques. This paper presents a Housing Development Building Management System (HDBMS strategy inspired by Building Energy Management System (BEMS concept that will integrate with smart buildings using Supply Side Management (SSM and Demand Side Management (DSM System. HDBMS is a Multi-Agent System (MAS based decentralized decision making system proposed by various authors. MAS based HDBMS was created using JAVA on a IEEE FIPA compliant multi-agent platform named JADE. It allows agents to communicate, interact and negotiate with energy supply and demand of the smart buildings to provide the optimal energy usage and minimal electricity costs.  This results in reducing the load of the power distribution system in smart buildings which simulation studies has shown the potential of proposed HDBMS strategy to provide the optimal solution for smart building energy management.

  18. Energy upgrades as financial or strategic investment? Energy Star property owners and managers improving building energy performance

    International Nuclear Information System (INIS)

    Gliedt, Travis; Hoicka, Christina E.

    2015-01-01

    Highlights: • Energy Star property owners/managers view energy as strategic or financial investments. • Energy performance improvements and motivations differ by property type. • Energy projects are most often funded by internal cash reserves. • Motivations and funding sources differ by type of energy project. • Environmental sustainability is an important criterion in many energy projects. - Abstract: Due to its significant carbon footprint and cost-effectiveness for upgrades, the commercial property sector is important for climate change mitigation. Although barriers to energy system changes, such as funding, financing and information, are well recognized, Energy Star property owners and managers are successfully overcoming these barriers and instigating energy efficiency upgrades, renewable energy installations, and behavior and management programs. To examine the decision-making process that leads to energy performance improvements, a national survey of property owners and management organizations of buildings that earned an Energy Star score of 75 or higher was conducted. The extent to which energy upgrades were considered strategic investments motivated by environmental sustainability or corporate social responsibility, or financial investments motivated by payback period or return-on-investment criteria, was contingent upon the property type and type of energy project. Environmental sustainability was found to be an important motivation for energy projects in office spaces in general, but in the case of smaller office spaces was often combined with motivations for corporate social responsibility. Energy projects on education properties were motivated by financial investment. Building envelope and mechanical efficiency upgrades were considered financial investments, while renewable energy, green roofs, and water conservation technologies were considered environmental sustainability initiatives

  19. Essential Approach of Maintenance Management System of Office Building

    Directory of Open Access Journals (Sweden)

    Masyatul Husna Othman

    2013-09-01

    Full Text Available Buildings will be worn-out, dilapidated and dirty as time goes by; but with good maintenance management we can at least prolong the lifespan of building longer as well as provide the building services and keep the building performance at it ultimate level. The importance of carrying out a systematic and routine maintenance works as part of works to conserve building performance is often neglected due to various factors including due to misunderstanding on the needs of the maintenance works itself and budget allocated. Thus, the purpose of the present study was to evaluating the level of maintenance management and quality of services in office buildings. This study also sought to answer the following question to determine the basic approach of maintenance management system used for office buildings.

  20. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  1. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  2. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  3. Delivering construction projects using innovative building technologies

    CSIR Research Space (South Africa)

    Ampofo-Anti, Naalamkai

    2017-07-01

    Full Text Available . Figure 1: IBT delivery flowchart Proceedings 11th Built Environment Conference 6 th August – 8 th August 2017 Delivering construction projects using innovative building technologies Durban, South Africa 5. REFERENCES Ampofo-Anti, N...

  4. The relation between project management education and newer streams in project management research

    DEFF Research Database (Denmark)

    Leimbach, Timo; Goodall, Julie Bladt

    2017-01-01

    In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from that of trai......In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from...... that of training technicians, to fostering reflective practitioners that are better equipped to handle the increasing complexity of the profession. This paper is based on a recently commenced re-search project titled "Rethinking Project Management Education – the Role of Universities" that is aimed at analysing...... how the development of PM research is reflected in the education of project managers. On the basis of a short overview of the state of the art of PM education research and practices, the possible challenges for the development of PM education are discussed, and, finding that there is a lack...

  5. Evaluation of Building Projects Using Earned Value Technique ...

    African Journals Online (AJOL)

    This study evaluates building construction projects using the Earned Value Analysis technique, the Experimental Approach, and Value Concept Analysis. The aim was to compare the cost incurred for an identified amount of work done on a project with the cost budgeted for the same work. The results were used to calculate ...

  6. Application of BIM technology in green building material management system

    Science.gov (United States)

    Zhineng, Tong

    2018-06-01

    The current green building materials management system in China's construction industry is not perfect, and there are still many shortcomings. Active construction of green building materials management system based on BIM technology, combined with the characteristics of green building materials and its relationship with BIM technology application, is urgently needed to better realize the scientific management of green building materials.

  7. Balancing management ‘for’ and ‘of’ stakeholders in projects and in temporary organizations

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Huemann, Martina

    need stakeholder resources, e.g. expertise and raw materials, and how this is managed appears to have an impact on the success of the project. This paper addressed the question on how sustainable development can be enhanced by building bridge between two fundamentally different management approaches......The global developments within society have an impact on all organizations and therefore also on temporary organizations, like projects. However, these temporary organizations are often managed differently than permanent organizations, as projects are more fluid and time restricted. Yet, they still...... to stakeholders: management ‘of’ versus ‘for’ stakeholders. The former derives from strategic management, ‘how do we make stakeholders comply with the organization’s needs?’, whereas the latter derives from business ethics, ‘how do we accommodate the needs of the stakeholders?’. A conceptual framework pointing...

  8. Project monitoring and evaluation: an enhancing method for health research system management.

    Science.gov (United States)

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  9. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  10. Project management of the build of the shore test facility for the prototype of PWR II

    International Nuclear Information System (INIS)

    Clarkson, D.T.

    1987-01-01

    The PWR II is a new design of nuclear steam raising plant for the Royal Navy's submarines. It features improved engineering for safety, increased power, increased shock resistance, reduced noise transmission to sea and reduced manning requirement. It is to be tested in a new prototype testing facility, the Shore Test Facility, which is a section of submarine hull containing a prototype of the nuclear steam raising plant and its support system. It is installed at the Vulcan Naval Reactor Test establishment at Dounreay in Scotland. The function of the establishment is to test new designs of core and reactor plant, validate the mathematical models used in their design, develop improved methods of operation and maintenance of the plant and test new items of equipment. The Shore Test Facility was built in large sections at Barrow-in-Furness and transported to Scotland. The project management for the construction of the Shore Test Facility is explained. It involves personnel from the Royal Navy, and a large number of people working for the contractors involved in the buildings, transportation, operation and maintenance of the Facility. (U.K.)

  11. Web-based energy information systems for energy management and demand response in commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Motegi, Naoya; Piette, Mary Ann; Kinney, Satkartar; Herter, Karen

    2003-04-18

    Energy Information Systems (EIS) for buildings are becoming widespread in the U.S., with more companies offering EIS products every year. As a result, customers are often overwhelmed by the quickly expanding portfolio of EIS feature and application options, which have not been clearly identified for consumers. The object of this report is to provide a technical overview of currently available EIS products. In particular, this report focuses on web-based EIS products for large commercial buildings, which allow data access and control capabilities over the Internet. EIS products combine software, data acquisition hardware, and communication systems to collect, analyze and display building information to aid commercial building energy managers, facility managers, financial managers and electric utilities in reducing energy use and costs in buildings. Data types commonly processed by EIS include energy consumption data; building characteristics; building system data, such as heating, ventilation, and air-conditioning (HVAC) and lighting data; weather data; energy price signals; and energy demand-response event information. This project involved an extensive review of research and trade literature to understand the motivation for EIS technology development. This study also gathered information on currently commercialized EIS. This review is not an exhaustive analysis of all EIS products; rather, it is a technical framework and review of current products on the market. This report summarizes key features available in today's EIS, along with a categorization framework to understand the relationship between EIS, Energy Management and Control Systems (EMCSs), and similar technologies. Four EIS types are described: Basic Energy Information Systems (Basic-EIS); Demand Response Systems (DRS); Enterprise Energy Management (EEM); and Web-based Energy Management and Control Systems (Web-EMCS). Within the context of these four categories, the following characteristics of EIS

  12. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  13. Carbon Footprint Estimation Tool for Residential Buildings for Non-Specialized Users: OERCO2 Project

    Directory of Open Access Journals (Sweden)

    Jaime Solís-Guzmán

    2018-04-01

    Full Text Available Existing tools for environmental certification of buildings are failing in their ability to reach the general public and to create social awareness, since they require not only specialized knowledge regarding construction and energy sources, but also environmental knowledge. In this paper, an open-source online tool for the estimation of the carbon footprint of residential buildings by non-specialized users is presented as a product from the OERCO2 Erasmus + project. The internal calculations, data management and operation of this tool are extensively explained. The ten most common building typologies built in the last decade in Spain are analysed by using the OERCO2 tool, and the order of magnitude of the results is analysed by comparing them to the ranges determined by other authors. The OERCO2 tool proves itself to be reliable, with its results falling within the defined logical value ranges. Moreover, the major simplification of the interface allows non-specialized users to evaluate the sustainability of buildings. Further research is oriented towards its inclusion in other environmental certification tools and in Building Information Modeling (BIM environments.

  14. Project Management Methodology in Human Resource Management

    Science.gov (United States)

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  15. Building Energy Management Open Source Software

    Energy Technology Data Exchange (ETDEWEB)

    Rahman, Saifur [Virginia Polytechnic Inst. and State Univ. (Virginia Tech), Blacksburg, VA (United States)

    2017-08-25

    Funded by the U.S. Department of Energy in November 2013, a Building Energy Management Open Source Software (BEMOSS) platform was engineered to improve sensing and control of equipment in small- and medium-sized commercial buildings. According to the Energy Information Administration (EIA), small- (5,000 square feet or smaller) and medium-sized (between 5,001 to 50,000 square feet) commercial buildings constitute about 95% of all commercial buildings in the U.S. These buildings typically do not have Building Automation Systems (BAS) to monitor and control building operation. While commercial BAS solutions exist, including those from Siemens, Honeywell, Johnsons Controls and many more, they are not cost effective in the context of small- and medium-sized commercial buildings, and typically work with specific controller products from the same company. BEMOSS targets small and medium-sized commercial buildings to address this gap.

  16. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  17. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  18. How an EAM solution could support a new build project?

    International Nuclear Information System (INIS)

    Luanco, E.

    2008-01-01

    In the context of the nuclear renaissance, the purpose of this paper is to address from an Enterprise Asset Management system (EAM) prospective the business needs of all the main stake holders of a new NPP? These are the Architect Engineers AE, the EPC and the future operator of a new NPP? It also covers the regulatory and asset life cycle management aspects of such a project. Besides meeting the US specific 10CFR part 52 requirements of the new combine construction and operating license (COL) process, we will review the generic ones which needs be satisfied no matter the country where this new build project is taking place. It also covers plant life cycle considerations with regards of the key information generated by the plant constructors and design providers which are of importance to the future NPP operators. All these requirements bring their own lot of issues that an appropriate EAM solution could address. Ventyx (formerly Indus International), is a nuclear EAM solutions provider for the passed 30 years and its solution used all over the world. This paper will review these requirements which could easily be supported by such a solution and review its potential key benefits it could bring to all involved parties. (authors)

  19. Contemporary state and possibilities of improvement of local infrastructures for leisure-time physical activity from the aspect of national policy, planning, building, financing and management - the Impala project, part ii.

    Directory of Open Access Journals (Sweden)

    Filip Neuls

    2013-01-01

    Full Text Available BACKGROUND: The second part of the IMPALA project was based on a wide discussion dealing with the problem of improving the local infrastructure for leisure time physical activity (LTPA from practical and specific points of view that were represented by invited participants from all Czech regions. One of the results of the IMPALA project was the finding from some experts that physical environment mostly in adults contribute to an increase of physical activity. AIM: The main aim of this part of the IMPALA project is to present specifically discussed problems from the area of national policy, planning, building, financing and management of the infrastructure for LTPA. METHODS: A discussion was held during a national workshop that was organized in June 2010 at the Faculty of Physical Culture, Palacký University in Olomouc and had a strictly structured programme that was announced and prepared by the main project coordinator. A discussion took place firstly in small groups according to each section (planning, building, financing, and management toward the assessment of a contemporary state and later on proposals whether some improvements exist. RESULTS: The biggest problem connected with planning is the non-existence of external as well as an internal evaluation of a planning process. In the building area the main problem is the accessibility of infrastructures in small villages; social-spatial aspects are not taken into account and building is also influenced by land ownership. Financing of local infrastructures for LTPA is very diverse, from public sources to private and also in different business models. Existing financial models are secured by law contracts and taken into account by operating costs. Focusing on management of infrastructures differs according to the owner, to financial sources, and to the type of infrastructure. Overemphasizing of top sport means higher allocation of finance mostly into sport infrastructures that are not or

  20. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  1. ICT for whole life optimisation of residential buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haekkinen, T.; Vares, S.; Huovila, P.; Vesikari, E.; Porkka, J. (VTT Technical Research Centre of Finland, Espoo (FI)); Nilsson, L.-O.; Togeroe, AA. (Lund University (SE)); Jonsson, C.; Suber, K. (Skanska Sverige AB (SE)); Andersson, R.; Larsson, R. (Cementa, Malmoe (SE)); Nuorkivi, I. (Skanska Oyj, Helsinki (FI))

    2007-08-15

    The research project 'ICT for whole life optimisation of residential buildings' (ICTWLORB) developed and tested the whole life design and optimisation methods for residential buildings. The objective of the ICTWLORB project was to develop and implement an ICT based tool box for integrated life cycle design of residential building. ICTWLORB was performed in cooperation with Swedish and Finnish partners. The ICTWLORB project defined as a premise that an industrialised building process is characterised by two main elements: a building concept based approach and efficient information management. Building concept based approach enables (1) the product development of the end product, (2) repetition of the basic elements of the building from one project to others and (3) customisation of the end-product considering the specific needs of the case and the client. Information management enables (1) the consideration of wide spectrum of aspects including building performance, environmental aspects, life cycle costs and service life, and (2) rapid adapting of the design to the specific requirements of the case. (orig.)

  2. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  3. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  4. Multidisplinary Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    Journal of Engineering, Project, and Production Management (EPPM-Journal) reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  5. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  6. Building Project Management Communities: Exploring the Contribution of Patterns Supported by Web 2.0 Technologies

    Science.gov (United States)

    Burd, Elizabeth L.; Hatch, Andrew; Ashurst, Colin; Jessop, Alan

    2009-01-01

    This article describes an approach whereby patterns are used to describe management issues and solutions to be used during the project management of team-based software development. The work describes how web 2.0 technologies have been employed to support the use and development of such patterns. To evaluate the success of patterns and the…

  7. Supporting UK adaptation: building services for the next set of UK climate projections

    Science.gov (United States)

    Fung, Fai; Lowe, Jason

    2016-04-01

    As part of the Climate Change Act 2008, the UK Government sets out a national adaptation programme to address the risks and opportunities identified in a national climate change risk assessment (CCRA) every five years. The last risk assessment in 2012 was based on the probabilistic projections for the UK published in 2009 (UKCP09). The second risk assessment will also use information from UKCP09 alongside other evidence on climate projections. However, developments in the science of climate projeciton, and evolving user needs (based partly on what has been learnt about the diverse user requirements of the UK adaptation community from the seven years of delivering and managing UKCP09 products, market research and the peer-reviewed literature) suggest now is an appropriate time to update the projections and how they are delivered. A new set of UK climate projections are now being produced to upgrade UKCP09 to reflect the latest developments in climate science, the first phase of which will be delivered in 2018 to support the third CCRA. A major component of the work is the building of a tailored service to support users of the new projections during their development and to involve users in key decisions so that the projections are of most use. We will set out the plan for the new climate projections that seek to address the evolving user need. We will also present a framework which aims to (i) facilitate the dialogue between users, boundary organisations and producers, reflecting their different decision-making roles (ii) produce scientifically robust, user-relevant climate information (iii) provide the building blocks for developing further climate services to support adaptation activities in the UK.

  8. Evaluation of programme for energy management in buildings; Evaluering av program for energiledelse i bygg

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    Enova SF needed to evaluate the programmes for energy management for greater and smaller building owners. The question was: What has been the impact of the Buildings Network and the energy management programmes for greater and smaller building owners on energy conservation and economic life , and are the programmes operated efficiently? The buildings which participated in the Buildings Network in 1996 - 2002 had an average reduction of the energy consumption of about 7 per cent, which is somewhat less than the supposed potential of 10 per cent. There is some uncertainty in this calculation and the true figure is probably 1 or 2 per cent higher. Whether this energy conservation tendency has continued after Enova took over the responsibility for the programme in 2002 is too early to measure. It is very probable that the public support to the projects has triggered off the saving, that is, there has been few free riders. After 2002, Enova has made the programme more efficient and the cost per building has been halved in the period 2001 - 2003. But some of the original infrastructure of the programme has been discontinued.

  9. Conceptualizing Knowledge Communication for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2015-01-01

    In the field of project management, the search for better ways to manage projects is ongoing. One of the more recent trends in the literature focuses on the integration of knowledge management in project management environments. Advantages of integrating knowledge management into projects can be ...... knowledge for project management, this paper focuses on extending Knowledge Management to include concepts related to communicating knowledge from the fields of rhetoric, knowledge communication, and corporate communication....

  10. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  11. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  12. Multidisplinary Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2012-01-01

    Full Text Available Journal of Engineering, Project, and Production Management (EPPM-Journal reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  13. 327 Building liquid waste handling options modification project plan

    International Nuclear Information System (INIS)

    Ham, J.E.

    1998-01-01

    This report evaluates the modification options for handling radiological liquid waste (RLW) generated during decontamination and cleanout of the 327 Building. The overall objective of the 327 Facility Stabilization Project is to establish a passively safe and environmentally secure configuration of the 327 Facility. The issue of handling of RLW from the 327 Facility (assuming the 34O Facility is not available to accept the RLW) has been conceptually examined in at least two earlier engineering studies (Parsons 1997a and Hobart l997). Each study identified a similar preferred alternative that included modifying the 327 Facility RLWS handling systems to provide a truck load-out station, either within the confines of the facility or exterior to the facility. The alternatives also maximized the use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes. An issue discussed in each study involved the anticipated volume of the RLW stream. Estimates ranged between 113,550 and 387,500 liters in the earlier studies. During the development of the 324/327 Building Stabilization/Deactivation Project Management Plan, the lower estimate of approximately 113,550 liters was confirmed and has been adopted as the baseline for the 327 Facility RLW stream. The goal of this engineering study is to reevaluate the existing preferred alternative and select a new preferred alternative, if appropriate. Based on the new or confirmed preferred alternative, this study will also provide a conceptual design and cost estimate for required modifications to the 327 Facility to allow removal of RLWS and treatment of the RLW generated during deactivation

  14. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  15. Change management methodologies trained for automotive infotainment projects

    Science.gov (United States)

    Prostean, G.; Volker, S.; Hutanu, A.

    2017-01-01

    An Automotive Electronic Control Units (ECU) development project embedded within a car Environment is constantly under attack of a continuous flow of modifications of specifications throughout the life cycle. Root causes for those modifications are for instance simply software or hardware implementation errors or requirement changes to satisfy the forthcoming demands of the market to ensure the later commercial success. It is unavoidable that from the very beginning until the end of the project “requirement changes” will “expose” the agreed objectives defined by contract specifications, which are product features, budget, schedule and quality. The key discussions will focus upon an automotive radio-navigation (infotainment) unit, which challenges aftermarket devises such as smart phones. This competition stresses especially current used automotive development processes, which are fit into a 4 Year car development (introduction) cycle against a one-year update cycle of a smart phone. The research will focus the investigation of possible impacts of changes during all phases of the project: the Concept-Validation, Development and Debugging-Phase. Building a thorough understanding of prospective threats is of paramount importance in order to establish the adequate project management process to handle requirement changes. Personal automotive development experiences and Literature review of change- and configuration management software development methodologies led the authors to new conceptual models, which integrates into the structure of traditional development models used in automotive projects, more concretely of radio-navigation projects.

  16. Drawing from past experience to improve the management of future underground projects

    International Nuclear Information System (INIS)

    Laughton, Christopher; Fermilab

    2004-01-01

    The high-energy physics community is currently developing plans to build underground facilities as part of its continuing investigation into the fundamental nature of matter. The tunnels and caverns are being designed to house a new generation of particle accelerators and detectors. For these projects, the cost of constructing the underground facility will constitute a major portion of the told capital cost and project viability can be greatly enhanced by paying careful attention to design and construction practices. A review of recently completed underground physics facilities and related literature has been undertaken to identify some management principles that have proven successful in underground practice. Projects reviewed were constructed in the United States of America and Europe using both Design-Build and more traditional Engineer-Procure-Construct contract formats. Although the physics projects reviewed tend to place relatively strict tolerances on alignment, stability and dryness, their overall requirements are similar to those of other tunnels and it is hoped that some of the principles promoted in this paper will be of value to the owner of any underground project

  17. Design Factors Influencing Quality of Building Projects in Nigeria: Consultants' Perception

    Directory of Open Access Journals (Sweden)

    Lukumon Oyedele

    2012-11-01

    Full Text Available Various factors identified from the literature that caninfluence quality of building projects in Nigeria have beenstudied by means of questionnaire survey sent to architects,engineers and quantity surveyors in the industry. From atotal response of 107 consultants, the importance of eachfactor was obtained via severity and frequency responsesof the factors. Data analysis includes comparisons ofranking among consultants using severity, frequency andimportance indexes, correlation analysis, and percentagerank agreement factor (PRAF to measure the agreement inthe importance ranking among the consultants.Correlation results between the professionals are architects/quantity surveyors (0.75, architects/engineers (0.21 ,and engineers/quantity surveyors (0.24. The percentagerank agreement factor (PRAF shows that the five mostimportant factors affecting quality are 'design changes'(78.9%; 'inadequate involvement of other professionalsduring the design stage' (78.9%; 'insufficient andunrealistic constraints of project cost' (71.1 %; 'poor levelof commitment to quality improvement among designprofessionals' (63.2%; and 'making design decisions oncost and not value of work' (55.3%. The results of this studywould provide feedback for the clients, project and qualitymangers and all the consultants in the industry, so thateffective management of quality can be ensured from theconceptual-design stage of the project.

  18. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  19. Towards the Building Information Modeling-Based Capital Project Lifecycle Management in the Luxury Yacht Industry

    Directory of Open Access Journals (Sweden)

    Liu Fuyong

    2017-11-01

    Full Text Available It will be a new approach that BIM’s capital project lifecycle management (CPLM applied to the yacht industry. This paper explored the feasibility of applying the principles and rationales of BIM for capital project lifecycle management in luxury yacht design, engineering, fabrication, construction and operation. The paper examined the premises and backbone technology of BIM. It then evaluated leading naval engineering and shipbuilding software applications and their development trends from the functional lens of BIM. To systematically investigate a BIM-based approach for capital project lifecycle management (CPLM in the luxury yacht industry, the paper proposed and outlined an implementation framework. A case study and a student competition use case were discussed to delineate the core constituents and processes of the proposed framework. The case of BIM was reviewed. Through the domestic custom luxury yacht design and prototyping student competition, the application of this framework in educational research is demonstrated and the initial quantitative assessment of the framework is carried out. Conclusions: a BIM-based CPLM implementation framework can help the luxury yacht industry capitalize on the global transformation to an information-centric and data-driven new business paradigm in shipbuilding with integrated design, manufacturing and production.

  20. 7 CFR 3565.351 - Project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  1. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  2. Building Management and ICT Learning in Civil Engineering Education

    DEFF Research Database (Denmark)

    Christiansson, Per Lennart

    2005-01-01

    The paper presents structures of the learning domains of building informatics exemplified with experiences from building management civil engineering and open education in Industrial IT at Aalborg University. The courses cover areas such as; object oriented programming and relational database...... design, human computer interface, user environment design and usability engineering, computer supported collaborative working, knowledge management, virtual buildings, intelligent buildings, and building systems simulation. Experiences from many years involvement in ICT supported learning and development...... taking into account improvement of learning styles, course content and learning material is also reported....

  3. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  4. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  5. ARCUS Project Managers and the Intangible Infrastructure of Large Interdisciplinary Arctic Research Networks

    Science.gov (United States)

    Myers, B.; Wiggins, H. V.; Turner-Bogren, E. J.; Warburton, J.

    2017-12-01

    Project Managers at the Arctic Research Consortium of the U.S. (ARCUS) lead initiatives to convene, communicate with, and connect the Arctic research community across challenging disciplinary, geographic, temporal, and cultural boundaries. They regularly serve as the organizing hubs, archivists and memory-keepers for collaborative projects comprised of many loosely affiliated partners. As leading organizers of large open science meetings and other outreach events, they also monitor the interdisciplinary landscape of community needs, concerns, opportunities, and emerging research directions. However, leveraging the ARCUS Project Manager role to strategically build out the intangible infrastructure necessary to advance Arctic research requires a unique set of knowledge, skills, and experience. Drawing on a range of lessons learned from past and ongoing experiences with collaborative science, education and outreach programming, this presentation will highlight a model of ARCUS project management that we believe works best to support and sustain our community in its long-term effort to conquer the complexities of Arctic research.

  6. Measurement of software project management effectiveness

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Approved for public release; distribution is unlimited. Evaluating, monitoring, and improving the effectiveness of project management can contribute to successful acquisition of software systems. In this dissertation, we introduce a quantitative metric for gauging the effectiveness of managing a software-development project. The metric may be used to evaluate and monitor project management effectiveness in software projects by project managers, technical managers, executive man...

  7. A Distributed Intelligent Automated Demand Response Building Management System

    Energy Technology Data Exchange (ETDEWEB)

    Auslander, David [Univ. of California, Berkeley, CA (United States); Culler, David [Univ. of California, Berkeley, CA (United States); Wright, Paul [Univ. of California, Berkeley, CA (United States); Lu, Yan [Siemens Corporate Research Inc., Princeton, NJ (United States); Piette, Mary [Univ. of California, Berkeley, CA (United States)

    2013-03-31

    The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-­Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-­to-­building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov-­ March) and a steam absorption chiller for use in the warm months (April-­October). Lighting in the open office areas is provided by direct-­indirect luminaries with Building Management System-­based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load

  8. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  9. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  10. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  11. Integrated project-management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table.

  12. Integrated project-management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table

  13. Assessing the influence of project management on quality during the early phases of construction projects

    Directory of Open Access Journals (Sweden)

    Ljevo Žanesa

    2018-12-01

    Full Text Available Although the quality of a process affects the quality of the end product, there is currently an insignif­icant amount of knowledge about the quality of project management (PM processes that directly affect the quality of the delivered product (constructed building. This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the con­structed building. The quality of the PM process is rep­resented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project partici­pants (with different managerial perspectives in terms of the indicators of quality of the delivered product. All par­ticipants, regardless of managerial perspective, believe that the most important indicator of the quality of prod­ucts for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046% of the basic set of vari­ables.

  14. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  15. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  16. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  17. Comprehensive management of project changes

    Directory of Open Access Journals (Sweden)

    Aljaž Stare

    2010-06-01

    Full Text Available The goal of this research was to examine how project changes can be prevented, and how to reduce their negative impact. Theoretical research examined risk management, project control and change management. Based on the study a “Comprehensive Change Management Model” was developed and verified after conducting empirical research in Slovenian enterprises. The research confirmed that risk management identifies possible changes and reduces their impact; project control ensures the timely detection of changes and an efficient response, while formal change management ensures the effective implementation of changes. The combined functioning of all three areas ensures effective project execution.

  18. Management of purchase process in realization of building investment

    Directory of Open Access Journals (Sweden)

    M. Radoń

    2010-07-01

    Full Text Available In building companies process of product and service purchase is one of the main processes of quality management system [1]. Because ofshort time-limits of contract realization, high specialization of works, necessity of fulfillment of high quality requirements and assurance of profitable financial effects the management of purchase process becomes very important element of work of the building company. The serious problem in creating and keeping the efficient system of purchase management is special type of purchase in building companies. Particular investments are realized in different country regions, objects are built based on the individual design documentations and each building becomes independent organization unit that organize purchase necessary for investment realization.An example of the management system of purchase process in building company is described in the paper. Just In Time system is widelyused during the realization of building investment. This system is especially useful in buildings because some investments, especially inbig cities, are characterized by restriction in building site. This makes impossible storing the products. In such cases close synchronization between times of delivery and requirements of purchase schedule and schedule of building realization is very important. Criteria of supplier selection as well as the methods of choosing the supplier are also presented in the paper. Special attention is paid to necessity of valuation of the purchase efficiency and the purchase risk. Basic coefficients of purchase efficiency are also described in the paper.

  19. Knowledge transfer from building operation to construction

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Chatzilazarou, Stamatia

    2017-01-01

    Purpose: To investigate how knowledge that derives from operation and maintenance of buildings can be stored and transferred in order to be reused in a future building project? Design/methodology/approach: The paper is theoretically based on knowledge management with a particular focus...... on interdepartmental knowledge transfer between departments responsible for operation and management and departments responsible for building projects in organisations with large and fast changing building portfolios. The paper includes a case study of the FM organisation of the Technical University of Denmark...... with data collection mainly by interviews with managers and staff in the relevant departments in this organisation. Findings: The case organisation seems to be aware of the importance of sharing and transferring their organisational knowledge. Over the last five years, the organisation has developed...

  20. Building Software, Building Community: Lessons from the Ropensci Project

    Science.gov (United States)

    Boettiger, C.

    2014-12-01

    rOpenSci is a developer collective originally formed in 2011 by graduate students and post-docs from ecology and evolutionary biology to collaborate on building software tools to facilitate a more open and synthetic approach in the face of transformative rise of large and heterogeneous data. Born on the internet (the collective only began through chance discussions over social media), we have grown into a widely recognized effort that supports an ecosystem of some 45software packages, engages scores of collaborators, has taught dozens of workshops around the world, and has secured over $480,000 in grant support. As young scientists working in an academic context largely without direct support for our efforts, we have first hand experience with most of the the technical and social challenges in developing sustainable scientific software. I will summarize our experiences, the challenges we have faced, and describe our approach and success in building an effective and diverse community around the rOpenSci project.

  1. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  2. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  3. Transferring water management knowledge: how actors, interaction and context influence the effectiveness of Dutch-funded projects in Romania

    NARCIS (Netherlands)

    Vinke-de Kruijf, Joanne

    2013-01-01

    Countries around the world face pressing, often similar, water problems. International projects in which knowledge is transferred from one country to another can contribute to solving these problems. Building on the experiences of three Dutch-funded flood risk management projects in Romania, this

  4. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  5. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  6. Building air quality: A guide for building owners and facility managers

    International Nuclear Information System (INIS)

    1991-12-01

    The guide was intended to help those individuals responsible for air quality control in buildings to prevent indoor air quality problems from developing and resolving such problems quickly should they develop. Background information and guidance on dealing with indoor air quality problems were provided. Specific topics included: factors which affect indoor air quality; sources of indoor air contaminants; heating, ventilation and air conditioning (HVAC) systems; the role of building occupants; effective communication between managers and others involved; developing an indoor air quality (IAQ) profile; managing a building for good IAQ; diagnosing IAQ problems; mitigating IAQ problems, hiring professional assistance to solve an IAQ problem; common IAQ measurements; HVAC systems and IAQ; moisture with resultant mold and mildew conditions; asbestos (1332214); radon (10043922); and resources through which additional information can be obtained. Indoor air quality forms were included which can be modified to meet individual needs

  7. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  8. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  9. Optimizing the Time Performance of Subcontractors in Building Projects

    Directory of Open Access Journals (Sweden)

    Andy K.W Ng

    2010-07-01

    Full Text Available The main contractors of Hong Kong building projects tend to subcontract most of their work. However, many of the subcontractors complain that they are not being fully utilized due main contractors’ poor site coordination of temporary works and interfacing works and plant supports etc. A list of critical site coordination problems caused by main contractors that had adversely influence to the time performance of subcontractors was prepared. A questionnaire survey was conducted to collect data to generate multiple regression equations that explain how the critical site coordination problems affected the time performance of different types of subcontractor. The survey results were validated by neural network analysis. Backward elimination method was adopted to identify the ‘most critical’ site coordination problems that enable main contractors to formulate measures to enhance their site management system.

  10. Culture and conflict management style of international project managers

    OpenAIRE

    Mohammed, U. K.; Prabhakar, G. P.; White, G.

    2008-01-01

    The management of culture has become increasingly important to many organisations and business disciplines, particularly multicultural and international project management. Cultural differences often result in varying degrees of conflict and require careful consideration. This study surveys 116 Project Managers using the Thomas-Kilmann Conflict Mode Instrument to determine their approach toward managing conflict. Indian, French and UK Project Managers’ conflict management style are correlated...

  11. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  12. Assessment of Energy Credits in LEED-Certified Buildings Based on Certification Levels and Project Ownership

    Directory of Open Access Journals (Sweden)

    Asli Pelin Gurgun

    2018-02-01

    Full Text Available Compared to other categories, the Energy and Atmosphere category contributes the most to the maximum obtainable points in the Leadership in Energy and Environmental Design (LEED certification system. The objective of the study was to identify the extent to which project teams take advantage of the credits in the Energy and Atmosphere category of LEED. This study analyzes the performance of practitioners in achieving points in the Energy and Atmosphere credits of LEED-New Construction (NC 2009 for 1500 buildings that received LEED certification in the US. For a better understanding of the credit patterns, the differences in the performance of practitioners are investigated relative to certification levels and project ownership. Achievement in credits is calculated in terms of percent of maximum points (PMP, since the maximum achievable points differ for each credit. Practitioners’ achievements in the credits were ranked as follows: (1 enhanced commissioning, (2 optimized energy performance, (3 enhanced refrigerant management, (4 green power, (5 measurement and verification, and (6 on-site renewable energy. The largest achievement differences were observed in the on-site renewable energy credit. Concerning building ownership, investors were found to optimize mostly energy efficiency and on-site renewable energy, but to mostly skip enhanced refrigerant management. Performance in the measurement and verification credit was similar for all owner types, whereas investors performed differently from corporations, and government agencies in the enhanced commissioning credit. Practitioners who recognize these priorities and differences are expected to be better positioned to make sustainability-related decisions in building design and construction.

  13. Universities in capacity building in sustainable development: focus on solid waste management and technology.

    Science.gov (United States)

    Agamuthu, P; Hansen, Jens Aage

    2007-06-01

    This paper analyses some of the higher education and research capacity building experiences gained from 1998-2006 by Danish and Malaysian universities. The focus is on waste management, directly relating to both the environmental and socio-economic dimensions of sustainable development. Primary benefits, available as an educational legacy to universities, were obtained in terms of new and enhanced study curricula established on Problem-oriented Project-based Learning (POPBL) pedagogy, which strengthened academic environmental programmes at Malaysian and Danish universities. It involved more direct and mutually beneficial cooperation between academia and businesses in both countries. This kind of university reach-out is considered vital to development in all countries actively striving for global and sustainable development. Supplementary benefits were accrued for those involved directly in activities such as the 4 months of field studies, workshops, field courses and joint research projects. For students and academics, the gains have been new international dimensions in university curricula, enhanced career development and research collaboration based on realworld cases. It is suggested that the area of solid waste management offers opportunities for much needed capacity building in higher education and research, contributing to sustainable waste management on a global scale. Universities should be more actively involved in such educational, research and innovation programmes to make the necessary progress. ISWA can support capacity building activities by utilizing its resources--providing a lively platform for debate, securing dissemination of new knowledge, and furthering international networking beyond that which universities already do by themselves. A special challenge to ISWA may be to improve national and international professional networks between academia and business, thereby making education, research and innovation the key driving mechanisms in

  14. 44 CFR 206.438 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  15. NET-ZERO ENERGY BUILDING OPERATOR TRAINING PROGRAM (NZEBOT)

    Energy Technology Data Exchange (ETDEWEB)

    Brizendine, Anthony; Byars, Nan; Sleiti, Ahmad; Gehrig, Bruce; Lu, Na

    2012-12-31

    The primary objective of the Net-Zero Energy Building Operator Training Program (NZEBOT) was to develop certificate level training programs for commercial building owners, managers and operators, principally in the areas of energy / sustainability management. The expected outcome of the project was a multi-faceted mechanism for developing the skill-based competency of building operators, owners, architects/engineers, construction professionals, tenants, brokers and other interested groups in energy efficient building technologies and best practices. The training program draws heavily on DOE supported and developed materials available in the existing literature, as well as existing, modified, and newly developed curricula from the Department of Engineering Technology & Construction Management (ETCM) at the University of North Carolina at Charlotte (UNC-Charlotte). The project goal is to develop a certificate level training curriculum for commercial energy and sustainability managers and building operators that: 1) Increases the skill-based competency of building professionals in energy efficient building technologies and best practices, and 2) Increases the workforce pool of expertise in energy management and conservation techniques. The curriculum developed in this project can subsequently be used to establish a sustainable energy training program that can contribute to the creation of new “green” job opportunities in North Carolina and throughout the Southeast region, and workforce training that leads to overall reductions in commercial building energy consumption. Three energy training / education programs were developed to achieve the stated goal, namely: 1. Building Energy/Sustainability Management (BESM) Certificate Program for Building Managers and Operators (40 hours); 2. Energy Efficient Building Technologies (EEBT) Certificate Program (16 hours); and 3. Energy Efficent Buildings (EEB) Seminar (4 hours). Training Program 1 incorporates the following

  16. Project management and performance management: potential transdisciplinary contributions

    Directory of Open Access Journals (Sweden)

    Gerrit van der Waldt

    2012-12-01

    Full Text Available As project management and performance management as management applications gain momentum in public sector settings, the question often arise as to if, how, and when these applications should complement each other in various policy implementation and service delivery initiatives. Answers to this question should be sought from various vantage points or perspectives. These vantage points may range from macro, meso, micro as well as theoretical-methodological perspectives. The purpose of this paper is to unlock the potential for transdisciplinary contributions between Project Management and Performance Management by focusing on the methodologies, functional areas, and practical applications of both management disciplines. It is argued that the respective methodologies and their processes should be unpacked to identify the timing or moment when each discipline could, and should, make a contribution to the success of the other. This will add value to the theoretical underpinnings and practical applications of both study domains in the public sector. The respective contributions are illustrated by means of application realities of both management practices in the South African Public Service. Keywords: project management, performance management, Public Sector applications, transdisciplinarity Disciplines: project management, performance management

  17. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  18. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    International Nuclear Information System (INIS)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2

  19. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  20. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  1. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  2. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  3. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  4. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  5. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  6. Evaluation of Maintenance Management in Iraqi Governmental Buildings

    Directory of Open Access Journals (Sweden)

    Qasim Mohammed Doos

    2016-09-01

    Full Text Available Impact of buildings in Iraq and other countries on the environment is obvious; this problem began to take scientific and humanitarian dimensions in order to reduce and eliminate this problem. This impact can be seen through the energy, water and raw materials consumed for the establishment, operation and maintenance of these buildings, as well as the emissions of hazardous gases and generations of solid wastes. This work was conducted to assess the current maintenance managerial practice for the governmental buildings to stand on the main obstacle and extrapolation of measures by means of interviews with experts to determine the effective factors and closed questionnaire to state the features and the need for new building maintenance management system which may assist for modeling new building maintenance management system which may help to reduce the deterioration levels of governmental buildings and the emission of hazardous gases and solid waste with cost efficient approach.

  7. NNC - managing major projects and the lessons learned

    International Nuclear Information System (INIS)

    Clements, J.M.

    1989-01-01

    The formation and development of NNC Ltd (formerly National Nuclear Corporation Ltd) is explained. Its role in the building of 16 nuclear power stations in the UK is outlined. For the last two of these, Heysham-B and Torness, NNC's role as station designer and manager of the nuclear island construction and at Torness as whole site overseers is described. The NNC negotiated and placed all the major contracts for the two stations and developed a budgetary control program through which the Central and South of Scotland Electricity Generating Boards were able to participate in the allotment of budget cover for each contract and for any anticipated variations and claims. Each project had a manager and about 20 responsible engineers plus contract engineers. The government decisions to change to PWR type reactors and to privatise the electricity industry have resulted in changes and structural management in NNC Ltd. (UK)

  8. Risk management for buildings -- Has the time come?

    Energy Technology Data Exchange (ETDEWEB)

    Berry, D.L.; Hunter, R.L.

    1997-08-01

    There are both incentives and challenges for applying formal risk management processes to buildings and other structures, including bridges, highways, dams, stadiums, shopping centers, and private dwellings. Based on an assessment of several issues, the authors conclude that for certain types of buildings and structures the time has come for the use of a formal risk-management approach, including probabilistic risk assessment methods, to help identify dominant risks to public health, safety, and security and to help manage these risks in a cost-effective manner.

  9. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  10. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    GRAPĂ ADELINA-ROXANA

    2014-05-01

    Full Text Available Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. This problem raises questions about the value and effectiveness of Project Management and Project Management systems. Programs and projects are considered as strategic assets for the majority of businesses, therefore, the trend of these organizations is to embrace a management by projects culture. The main objective of Project Management nowadays is to ensure programs and projects aligned to a certain strategy and also to provide for every member of an organization the ability to take proactive actions creating additional benefits.

  11. System approach to machine building enterprise innovative activity management

    Directory of Open Access Journals (Sweden)

    І.V. Levytska

    2016-12-01

    Full Text Available The company, which operates in a challenging competitive environment should focus on new products and provide innovative services that enhance their innovation to maintain the company’s market position. The article deals with the peculiarities of such an activity in the company. The authors analyze the various approaches used in the management, and supply the advantages and disadvantages of each. It is determine that the most optimal approach among them is a system approach. The definition of the consepts "a system" and "a systematic approach to innovative activity management" are suggested. The article works out the system of machine building enterprise innovative activity management, the organization of machine building enterprise innovative activity; the planning of machine building enterprise innovative activity; the control in the system of machine building enterprise innovative activity management; the elements of the control subsystem. The properties, typical for the system of innovative management, are supplied. The managers, engaged in enterprise innovative activity management, must perform a number of the suggested tasks, which affect the efficiency of the enterprise as a whole. These exact tasks are performed using the systematic approach, providing the enterprise competitive operation and quick adaptation to changes in the external environment.

  12. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  13. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  14. Project and Sports Events Management

    OpenAIRE

    Sebastian Madalin MUNTEANU

    2011-01-01

    This paper tries to capture the importance it holds the project management in socio-cultural sector which stands out when we refer to the sport. So when we talk about project management in sport, to consider a much larger vision, a new project management perspective, they involve a responsibility for the implementation of an event with global impact on very long term. Sports projects, as history shows us, played a significant role in developing societies. Also, all major sports industry proje...

  15. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  16. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  17. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    GARRISON, R.C.

    2000-01-01

    This document implements the procedure for providing configuration control for the monitoring and control systems associated with the operation of the Canister Storage Building (CSB). It identifies and defines the configuration items in the monitoring and control systems, provides configuration control of these items throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of the items. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998), HNF-PRO-309, Computer Software Quality Assurance Requirements, HNF-PRO-2778, IRM Application Software System Life Cycle Standards, and applicable sections of administrative procedure AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration Management

  18. Modern project management theory and knowledge framework

    Institute of Scientific and Technical Information of China (English)

    Luo Zhongbao

    2014-01-01

    The scholars increasingly pay at ention to the internal rules in knowledge development and innovation of construction engineering management,as wel as the framework for engineering management body of knowledge. Considering the one-of-a-kind characteristic of construction project s and highly dependence from projects on management knowledge and its innovation,this paper analyzed the knowledge body of engineering management and its development dimension ,such as thinking and knowledge structure dimensions. The engineering management knowledge innovation model and structural model were put forward. The paper reviewed and proposed the engineering management knowledge system framework under engineering thinking mode,including the basic knowledge system framework which is used in engineering management research ,and a framework for body of knowledge which is applicable for engineering management practice. Based on a brief analysis of engineering management practice,this paper analyzed the development progres of engineering management from engineering thinking to ethical thinking and philosophical thinking. A dynamic model formed from the modern engineering management theory was put forward. The construction of projects are divided into two stages:an investment decision-making stage, and project implementation stage. According to the fact that project owners obtain the project products by transaction,the management during project implementation stage are divided into two aspects:project transaction management for the owner, and construction project management for the contractor. Thus, the three theoretical modules of modern engineering management were established:project investment decision-making management theory,engineering transaction management theory, and engineering project management theory. This paper further analyzed the content and basic theoretical issues of each theoretical module.

  19. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  20. Project Management Methodology for the Development of M-Learning Web Based Applications

    Directory of Open Access Journals (Sweden)

    Adrian VISOIU

    2010-01-01

    Full Text Available M-learning web based applications are a particular case of web applications designed to be operated from mobile devices. Also, their purpose is to implement learning aspects. Project management of such applications takes into account the identified peculiarities. M-learning web based application characteristics are identified. M-learning functionality covers the needs of an educational process. Development is described taking into account the mobile web and its influences over the analysis, design, construction and testing phases. Activities building up a work breakdown structure for development of m-learning web based applications are presented. Project monitoring and control techniques are proposed. Resources required for projects are discussed.

  1. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  2. The application of modern project management principles and processes in major nuclear decommissioning programmes

    International Nuclear Information System (INIS)

    Bayliss, C. R.

    2003-01-01

    The UKAEA has embarked upon an accelerated programme of decommissioning works. This has resulted in a review of its project management systems and processes. This paper describes these processes and their application to nuclear decommissioning and associated new build construction projects. Efficiencies from these processes are necessary. In addition this paper describes how UKAEA, where appropriate, utilizes modern forms of alliance contract so as to work in partnership with its contractors. (author)

  3. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  4. Use of reference buildings to assess the energy saving potentials of the residential building stock: The experience of TABULA project

    International Nuclear Information System (INIS)

    Ballarini, Ilaria; Corgnati, Stefano Paolo; Corrado, Vincenzo

    2014-01-01

    Retrofit actions applied to the existent building stock aim at increasing the energy performance, considering the optimal trade-off between energy savings and costs, according to the Directive 2010/31/EU. To select effective refurbishment measures and to quantify the energy saving potentials of the existent building stock, the analysis should be performed on “reference buildings”. This article presents a methodology for the identification of reference buildings, according to the IEE-TABULA project (2009–12) aimed at creating a harmonised structure for “European Building Typologies”. Among the possible applications of the building typology, this work focuses on the potentialities of energy savings and CO 2 emission reductions for the European residential building stock. In particular, the Italian approach to model the energy balance of a subset of the national building stock is described; the results show the enormous potentialities of energy savings even with basic energy retrofit actions. Cost analyses were not in the scope of the project, but the results of this study are the basis for further investigations aimed at assessing the cost effectiveness of sets of measures. In this regard, the TABULA building-types are being applied by the Italian government for calculating cost-optimal levels of energy performance, complying with the Directive 2010/31/EU objectives. - Highlights: • European building stocks need retrofit actions to improve the energy performance. • Necessity to define “reference buildings” in order to perform cost-optimal analyses. • Definition of a National “Building Typology” according to IEE-TABULA project. • Methodology to identify reference buildings for assessing energy saving potentials

  5. Building Maintenance Management System for Heritage Museum

    OpenAIRE

    Md Azree Othuman Mydin; Siti Hajar Ismail; Norhidayah Md Ulang

    2012-01-01

    An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, ...

  6. Evaluation and financial risk management of urban renewal projects in partnership with public and private

    Directory of Open Access Journals (Sweden)

    Ehsan Hassani

    2011-10-01

    Full Text Available Financing plays an important role for renewal of old city building is find suitable financing plan. A proper financial management in one hand has a direct relationship with project main factors such as: time, cost and quality of the project, and on the other hand, achieving project goals requires a comprehensive insight of project, stockholders as well as other relative situation in regard with the project. Considering the complication of execution such projects and the number of shareholders, one of the best attitudes towards the project management is risk management. This research is a qualitative and practical, which reviews the effects of project management factors on financial return of urban renewal sachem. The required information gained through a survey and via questionnaire and interviews with specialists. This article first describes the public private financial partnership and then, based on the results gained from a case study done on one of the renewal schemes in Mashhad metropolitan areas. Next, it identifies and evaluates of positive and negative risks, which lead to threats and opportunities will be performed and will attempt to respond the existent risks. Finally, we provide a framework for the risk assessment of the housing units.

  7. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  8. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  9. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  10. ADVERTISEMENTS FOR ICT PROJECT MANAGERS SHOW DIVERSITY BETWEEN SWEDISH EMPLOYERS’ AND PROJECT MANAGEMENT ASSOCIATIONS’ VIEWS OF PM CERTIFICATIONS

    Directory of Open Access Journals (Sweden)

    Siw Lundqvist

    2014-05-01

    Full Text Available Appointing ICT project managers is a delicate issue for management; not least since ICT projects are known to be unsuccessful in delivering the required product in time and on budget. Hence, it is even more important to find the “right” individual for the job. According to project management associations, certification in project management is a prerequisite for a project manager’s successful career. The appreciation of project management certifications among Swedish employers was studied using data collected from job advertisements for ICT project managers during four years (2010-2013. Judged on how the advertisements were worded the result indicates surprisingly low interest from the employers’ side, which conflicts with the project management associations statements about the certifications’ indispensable value for successful projects. Furthermore, it conflicts with a common understanding of certifications as essential for appointment as a project manager. The findings identify a possible gap between PM associations’ and employers’ views regarding the certifications’ value, and highlight the necessity of seriously considering whether it is worthwhile for the individuals to strive for, and for the organizations to promote certification, since it is costly in both time, effort and money.

  11. Towards a Tectonic Sustainable Building Practice

    DEFF Research Database (Denmark)

    Bech-Danielsen, Claus

    and environmental problems? The objective of the project is to analyse and develop the tectonic practice based on case studies, in relation to: • Cultural anchoring and identity creation • Building culture and creative processes • Sustainability, lifecycle and resource management The research project is divided...... into a main project and various subprojects, respectively, two levels that mutually feed each other.The main project, which constitutes the general level, seeks to identify a coherent strategy towards a new tectonically sustainable building culture.The subprojects look at partial issues and go into specific......Can a tectonic building practice be strengthened through new creation processes, where resources are used more purposefully, deliberately and systematically? Which new measures are necessary if we are to develop a strong tectonic building practice with due consideration for increasing climate...

  12. Tkinter GUI application development blueprints build nine projects by working with widgets, geometry management, event handling, and more

    CERN Document Server

    Chaudhary, Bhaskar

    2018-01-01

    Tkinter is the built-in GUI package that comes with standard Python distributions. It is a cross-platform package, which means you build once and deploy everywhere. It is simple to use and intuitive in nature, making it suitable for learners. This book will enable you to use Tkinter effectively through working on nine versatile projects.

  13. Improving energy efficiency in buildings under the framework of facility management and leasing financing

    Energy Technology Data Exchange (ETDEWEB)

    Leutgoeb, Klemens [Austrian Energy Agency (Austria)

    2007-07-01

    Non-residential buildings see a big variety of building management and financing schemes. Two approaches quickly gain shares in the European real estate market: Leasing Financing (LF) and Facility Management (FM). They change the framework for the implementation of energy efficiency measures: LF influences the decision criteria in new construction and refurbishment; FM plays a crucial role during the operation phase.Although LF and FM introduce new parties and thus an additional set of interests, they must not be perceived as obstacles per se: They also offer new ways towards energy efficiency. Pilot activities in Austria demonstrate the successful integration of advanced energy services into the framework of LF and FM: At the end of the contract duration, leasing-financed buildings may be confronted with a need for comprehensive refurbishment. Here, leasing can become an important catalyst in preparing the refurbishment project. Integrating energy efficiency measures to the refurbishment activity and guaranteeing thermal-energetic qualities, provide the lessor with the opportunity to prolong and enlarge a running contract. Furthermore, this service reduces his credit risk, due to reduced running (i.e. energy) cost for the lessee. FM means outsourcing of selected building management functions to an external specialist. The list of requested services can be extended by the identification, implementation, operation and potentially also financing of cost-effective energy saving measures, and by a guarantee on energy cost savings - in other words by integrating elements of EPC-contracts into FM.

  14. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  15. Project Management in Higher Education

    Science.gov (United States)

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  16. On Services for Collaborative Project Management

    Science.gov (United States)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  17. Smart Building Management Systems and Internet of Things

    Directory of Open Access Journals (Sweden)

    Jean Yves Astier

    2017-07-01

    Full Text Available After a brief historical reminder on SCADA systems, we will present the new challenges regarding modern building technical management (BTM systems. We identify the technological evolutions, which allow us to address these new issues, and describe the software and hardware architectures of our Building Management Internet of Things (BMIoT solution. We end by comparing with other older solutions and by a short description of the new business models, our solution allows.

  18. Harmonized biosafety regulations are key to trust building in regional agbiotech partnerships: the case of the Bt cotton project in East Africa

    Directory of Open Access Journals (Sweden)

    Ezezika Obidimma C

    2012-11-01

    Full Text Available Abstract Background The Bacillus thuringiensis (Bt cotton public-private partnership (PPP project in East Africa was designed to gather baseline data on the effect of Bt cotton on biodiversity and the possibility of gene flow to wild cotton varieties. The results of the project are intended to be useful for Kenya, Uganda, and Tanzania when applying for biosafety approvals. Using the backdrop of the different biosafety regulations in the three countries, we investigate the role of trust in the Bt cotton partnership in East Africa. Methods Data were collected by reviewing relevant project documents and peer-reviewed articles on Bt cotton in Tanzania, Kenya and Uganda; conducting face-to-face interviews with key informants of the project; and conducting direct observations of the project. Data were analyzed based on recurring and emergent themes to create a comprehensive narrative on how trust is understood and built among the partners and with the community. Results We identified three factors that posed challenges to building trust in the Bt cotton project in East Africa: different regulatory regimes among the three countries; structural and management differences among the three partner institutions; and poor public awareness of GM crops and negative perceptions of the private sector. The structural and management differences were said to be addressed through joint planning, harmonization of research protocols, and management practices, while poor public awareness of GM crops and negative perceptions of the private sector were said to be addressed through open communication, sharing of resources, direct stakeholder engagement and awareness creation. The regulatory differences remained outside the scope of the project. Conclusions To improve the effectiveness of agbiotech PPPs, there is first a need for a regulatory regime that is acceptable to both the public and private sector partners. Second, early and continuous joint planning; sharing of

  19. RISK MANAGEMENT IN THE OPERATING ACTIVITIES OF AN ENTERPRISE AND IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

    Directory of Open Access Journals (Sweden)

    Lech Jędrzejewski

    2017-03-01

    Full Text Available The paper is devoted to issues related to building a risk management system for businesses in the areas of operations and implementation of infrastructure projects. The article defines the concept of risk in business processes and identifies risks occurring in infrastructure projects. In the text, the principles have been presented for protection against the effects of political, contracting, environmental, ecological, product, process, operational and personnel risk.

  20. ALIGNMENT BETWEEN THE TYPES OF PROJECTS AND SKILLS PROJECT MANAGEMENT IN THE AES SUL DISTRIBUIDORA GAÚCHA DE ENERGIA S.A

    Directory of Open Access Journals (Sweden)

    Greice de Bem Noro

    2011-10-01

    Full Text Available The pursuit of excellence and new markets and customers has driven companies to build methods to reach goals and improve their strategies and competitive advantages. Therefore, the project management (PM has played a key role in the organizations to adjust deadlines, organizing methods and decision-making. Although many companies already use the PM as resource, this research attempt to contribute to increase the area trough the debate about alignment of companies projects types with the choice of the leader, in line with their skills. The study was developed in the AES Sul Distribuidora Gaúcha de Energia SA (AES Sul and examined how the alignment of the types of projects and management competencies can add value to the organization. The methodological procedure is classified as qualitative, quantitative and descriptive, conducted through a case study. The main results show the need for adjustments between the essential skills and AES Sul types of projects, beyond find some gaps regarding the leaders competencies.

  1. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  2. 76 FR 56363 - Capital Project Management

    Science.gov (United States)

    2011-09-13

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... current FTA rule for project management oversight into a discrete set of managerial principles for sponsors of major capital projects; enable FTA to more clearly identify the necessary management capacity...

  3. 78 FR 16460 - Capital Project Management

    Science.gov (United States)

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  4. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  5. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  6. Managing dualities in organizational change projects

    OpenAIRE

    Shaw, David

    2016-01-01

    When managers want to change their organisation they often set up a project to do it, in the belief that doing so simplifies and focuses the change initiative and brings greater assurance of success. Case studies of three organisational change projects undertaken by Arts Council England during 2006-2007 are used to examine the notion of project management and change management as a duality. It is argued that the structured, systematic approach associated with project management needs to be ba...

  7. Controlling Beryllium Contaminated Material And Equipment For The Building 9201-5 Legacy Material Disposition Project

    International Nuclear Information System (INIS)

    Reynolds, T.D.; Easterling, S.D.

    2010-01-01

    This position paper addresses the management of beryllium contamination on legacy waste. The goal of the beryllium management program is to protect human health and the environment by preventing the release of beryllium through controlling surface contamination. Studies have shown by controlling beryllium surface contamination, potential airborne contamination is reduced or eliminated. Although there are areas in Building 9201-5 that are contaminated with radioactive materials and mercury, only beryllium contamination is addressed in this management plan. The overall goal of this initiative is the compliant packaging and disposal of beryllium waste from the 9201-5 Legacy Material Removal (LMR) Project to ensure that beryllium surface contamination and any potential airborne release of beryllium is controlled to levels as low as practicable in accordance with 10 CFR 850.25.

  8. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  9. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  10. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  11. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  12. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  13. Management of built heritage via HBIM Project: A case of study of flooring and tiling

    Directory of Open Access Journals (Sweden)

    Juan Enrique Nieto

    2016-05-01

    Full Text Available Building Information Modelling (BIM is a collaborative system that has been fully developed in the design and management of industries involved in Architecture, Engineering and Construction (AEC sectors. There are, however, very few studies aimed at managing information models in the field of architectural and cultural heritage interventions. This research therefore proposes an innovative methodology of analysis and treatment of the information based on a representative 3D graphic model of the flooring and wall tiling of a historic building. The objective is to set up a model of graphic information which guarantees the interoperability of the aforementioned information amongst the diverse disciplines intervening in the conservation and restoration process. The Pavillion of Charles V, a Renaissancecharacterised building located in outdoor areas of the Alcazar of Seville, Spain, was selected for the study. This work constitutes a project of intervention based on Heritage or Historic Building Information Modelling, called the “HBIM Project”.

  14. 77 FR 24505 - Hazard Mitigation Assistance for Wind Retrofit Projects for Existing Residential Buildings

    Science.gov (United States)

    2012-04-24

    ...] Hazard Mitigation Assistance for Wind Retrofit Projects for Existing Residential Buildings AGENCY... for Wind Retrofit Projects for Existing Residential Buildings. DATES: Comments must be received by... must include the agency name and docket ID. Regardless of the method used for submitting comments or...

  15. Project management strategies for prototyping breakdowns

    DEFF Research Database (Denmark)

    Granlien, Maren Sander; Pries-Heje, Jan; Baskerville, Richard

    2009-01-01

    , managing the explorative and iterative aspects of prototyping projects is not a trivial task. We examine the managerial challenges in a small scale prototyping project in the Danish healthcare sector where a prototype breakdown and project escalation occurs. From this study we derive a framework...... of strategies for coping with escalation in troubled prototyping projects; the framework is based on project management triangle theory and is useful when considering how to manage prototype breakdown and escalation. All strategies were applied in the project case at different points in time. The strategies led...

  16. PROJECT APPROACH TO ENERGY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Інга Борисівна СЕМКО

    2016-02-01

    Full Text Available Project management is widely used around the world as a tool to improve business performance. Correct implementation of the program of implementation of energy efficiency is accompanied by the adoption of an appropriate legislative framework, support programs, the approval of market-based instruments. Currently, it is paying enough attention to the effective application of market-based instruments, although most of the activities in the field of energy efficiency from the economic side are quite profitable. The authors suggested the use of the methodology of project management to the management of energy-saving measures, new approaches to the place and role of project management in the hierarchy of guidance. As a result, this innovation can improve the competitiveness of enterprises. The conclusions that the energy-saving project management allows you to get the best results for their implementation by reducing the time, resources, risk reduction.

  17. Energy management study: A proposed case of government building

    International Nuclear Information System (INIS)

    Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd; Baharum, Mohd Faizal

    2015-01-01

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building

  18. Energy management study: A proposed case of government building

    Science.gov (United States)

    Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd; Baharum, Mohd Faizal

    2015-05-01

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.

  19. Energy management study: A proposed case of government building

    Energy Technology Data Exchange (ETDEWEB)

    Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd [School of Technology Management and Logistics, Universiti Utara Malaysia, 06010 Sintok, Kedah (Malaysia); Baharum, Mohd Faizal [School of Building, Housing and Planning, Universiti Sains Malaysia, 11800 Penang (Malaysia)

    2015-05-15

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.

  20. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    OpenAIRE

    GRAPA ADELINA-ROXANA; SOARE ALICE-MAGDALENA

    2014-01-01

    Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. T...

  1. Exploring the Client–AEC Interface in Building Lifecycle Integration

    Directory of Open Access Journals (Sweden)

    John M. Kamara

    2013-07-01

    Full Text Available The creation and management of buildings over their lifecycle involves the cooperation of many organizations, which broadly fall into a client domain and AEC (architecture, engineering, construction domain. While this mix of expertise is essential, the ineffective management of the boundaries between these organizations can undermine building lifecycle performance. This paper explores client–AEC interactions at the project development and handover stages, with a view to discovering insights into client–AEC interface management for effective building lifecycle integration (BLI. The concept of boundary objects provided the theoretical framework to discuss findings from two case studies on the project development phase of a private finance initiative project, and the asset development process in a repeat client organization. The findings suggest that there are different emphases in boundary crossing activities at different stages, with boundary roles that relate to decision-making and authority to commit resources being more relevant at the project development stage, whereas the need to explain meanings appear to be more relevant at the handover stage. AEC professionals in client organizations play a crucial role in bridging knowledge boundaries about buildings, but this professional/functional strand to BLI needs to be effectively managed alongside the organizational boundaries, since the authority to resource BLI efforts resides within organizations.

  2. Intelligent multi-objective optimization for building energy and comfort management

    Directory of Open Access Journals (Sweden)

    Pervez Hameed Shaikh

    2018-04-01

    Full Text Available The rapid economic and population growth in developing countries, effective and efficient energy usage has turned out to be crucial due to the rising concern of depleting fossil fuels, of which, one-third of primary energy is consumed in buildings and expected to rise by 53% up to 2030. This roaring sector posing a challenge, due to 90% of people spend most of their time in buildings, requires enhanced well-being of indoor environment and living standards. Therefore, building operations require more energy because most of the energy is consumed to make the indoor environment comfortable. Consequently, there is the need of improved energy efficiency to decrease energy consumption in buildings. In relation to this, the primary challenge of building control systems is the energy consumption and comfort level are generally conflicting to each other. Therefore, an important problem of sustainable smart buildings is to effectively manage the energy consumption and comfort and attain the trade-off between the two. Thus, smart buildings are becoming a trend of future construction that facilitates intelligent control in buildings for the fulfillment of occupant’s comfort level. In this study, an intelligent multi-objective system has been developed with evolutionary multi-objective genetic algorithm (MOGA optimization method. The corresponding case study simulation results for the effective management of users’ comfort and energy efficiency have been carried out. The case study results show the management of energy supply for each comfort parameter and maintain high comfort index achieving balance between the energy consumption and comfort level. Keywords: Energy, Buildings, Comfort, Management, Optimization, Trade-off

  3. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  4. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  5. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  6. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  7. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  8. Four years in / four years out : two university buildings 2000-2008

    Energy Technology Data Exchange (ETDEWEB)

    Lovell, J. [Royal Inst. of British Architects, London (United Kingdom); Washington Univ., St. Louis, MO (United States). Graduate School of Architecture and Urban Design

    2009-07-01

    The University of Cambridge commissioned London-based Allies and Morrison to develop and design 2 new buildings for its Sidgwick campus, England. Two naturally ventilated buildings were completed and occupied in 2004. The Estate Management and Building Service at the University of Cambridge is now reviewing the actual energy performance of both buildings in terms of user comfort. The finding will be compared against original projections of the design team. The review will also compare actual running costs against projected costs and feedback from building users and facilities management. The approach taken by client and design team towards the life-time energy performance of the building was examined in terms of comfort and control and load management. A more complex system of sub-metering is now proposed for all new buildings. Post occupancy feedback data was used to evaluate the successes and failures of the project teams in terms of energy performance, thermal comfort and building management communication four years after completion. This paper noted that if viewed over 30 years, the initial construction budget of a building accounts for only a fraction of the true cost of a building. During its lifetime, primary expenditure will likely to be upon personnel costs; work performance and salaries, staff retention and absenteeism. Therefore, the success of a building must be seen in the context of its whole life and the comfort of its users. 14 refs., 9 figs.

  9. 78 FR 27968 - Federal Management Regulation; Redesignations of Federal Buildings

    Science.gov (United States)

    2013-05-13

    ... Management Regulation; Redesignations of Federal Buildings AGENCY: Public Buildings Service (PBS), General... designation and redesignation of six Federal buildings. DATES: Expiration Date: This bulletin announcement expires July 30, 2013. The building designations and redesignations remains in effect until canceled or...

  10. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  11. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  12. New power plants in Europe? A challenge for project and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Hartung, M. [RWE Technology GmbH, Essen (Germany)

    2010-07-01

    Against the backdrop of the age structure of the European power plant fleet and the EU's climate protection targets, a significant need for new-build and replacement power plant capacity is becoming apparent. RWE has thus founded RWE Technology in order to achieve its growth targets, but also to implement its ongoing power plant new-build programme in the order of no fewer than 12,000 MW in capacity. This company combines the project management and engineering capacity of the Group in order to meet the challenges posed by the fast-changing energy market. The following article explains the specific steps taken to achieve these objectives. (orig.)

  13. Integrated management tool for controls software problems, requests and project tasking at SLAC

    International Nuclear Information System (INIS)

    Rogind, D.; Allen, W.; Colocho, W.; DeContreras, G.; Gordon, J.; Pandey, P.; Shoaee, H.

    2012-01-01

    The Accelerator Directorate (AD) Instrumentation and Controls (ICD) Software (SW) Department at SLAC, with its service center model, continuously receives engineering requests to design, build and support controls for accelerator systems lab-wide. Each customer request can vary in complexity from a small software engineering change to a major enhancement. SLAC's Accelerator Improvement Projects (AIPs), along with DOE Construction projects, also contribute heavily to the work load. The various customer requests and projects, paired with the ongoing operational maintenance and problem reports, place a demand on the department that consistently exceeds the capacity of available resources. A centralized repository - comprised of all requests, project tasks, and problems - available to physicists, operators, managers, and engineers alike, is essential to capture, communicate, prioritize, assign, schedule, track, and finally, commission all work components. The Software Department has recently integrated request / project tasking into SLAC's custom online problem tracking 'Comprehensive Accelerator Tool for Enhancing Reliability' (CATER) tool. This paper discusses the newly implemented software request management tool - the workload it helps to track, its structure, features, reports, work-flow and its many usages. (authors)

  14. Energy management handbook for building operating engineers student workbook

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The handbook provides operating engineers with the basic information needed to implement specific energy conservation opportunities, and additional information is presented relative to the formulation and development of the energy management plan. Chapters are entitled: The Need for Energy Management (International Factors, The US Energy Situation, Energy and the Building Owner); The Fundamentals of Energy Consumption in Buildings (Energy Basics, Heat Basics, Heat Flow and the Building Envelope, Air and Comfort, Factors Affecting Energy Use In Buildings); Principles of Energy Conservation (Building Energy Consumption Characteristics); Planning the Energy Management Program (Obtaining Commitment and Support, Establishing the Energy Use Index, Organizing to Develop the Plan, Developing and Implementing the Plan); Conducting a Survey of Facilities and Operations (The Energy Audit, Preparation of Building and Systems Profile, Measurement and Instrumentation); Guidelines for Energy Conservation (Operator ECO's, Owner ECO'S); Developing the Draft Final Plan (Analyze Survey Findings, Putting the Plan on Paper, Review and Submit); Implementing the Program (Developing the Final Plan, Implementing the Plan, Monitoring and Updating the Program). A glossary is included and specific information on degree days and cooling hours for some selected cities and a computer energy study data for the New York Hilton are included in appendices. (MCW)

  15. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  16. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  17. ASEAN-USAID Buildings Energy Conservation Project. Final report, Volume 3: Audits

    Energy Technology Data Exchange (ETDEWEB)

    Loewen, J.M.; Levine, M.D.; Busch, J.F. [eds.

    1992-06-01

    The auditing subproject of the ASEAN-USAID Buildings Energy Conservation Project has generated a great deal of auditing activity throughout the ASEAN region. Basic building characterisfic and energy consumption data were gathered for over 200 buildings and are presented in this volume. A large number of buildings were given more detailed audits and were modeled with either the ASEAM-2 computer program or the more complex DOE-2 program. These models were used to calculate the savings to be generated by conservabon measures. Specially audits were also conducted, including lighting and thermal comfort surveys. Many researchers in the ASEAN region were trained to perform energy audits in a series of training courses and seminars. The electricity intensifies of various types of ASEAN buildings have been calculated. A comparison to the electricity intensity of the US building stock tentatively concludes that ASEAN office buildings are comparable, first class hotels and retail stores are more ewctricity intensive than their US counterparts, and hospitals are less intensive. Philippine and Singapore lighting surveys indicate that illuminance levels in offices tend to be below the minimum accepted standard. Computer simulations of the energy use in various building types generally agree that for most ASEAN buildings, electricity consumption for air-conditioning (including fan power) consumes approximately 60% of total building electricity. A review of the many studies made during the Project to calculate the savings from energy conservation opportunities (ECOS) shows a median potential savings of approximately 10%, with some buildings saving as much as 50%. Singapore buildings, apparently as a result of previously implemented efficient energy-use practices, shows a lower potential for savings than the other ASEAN nations. Air-conditioning ECOs hold the greatest potential for savings.

  18. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  19. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  20. Communication between Participants and Non-Participants in Analytical Capacity Building Projects: Management Advice to Family Farms in Benin

    Science.gov (United States)

    Rouchouse, Marine; Faysse, Nicolas; De Romemont, Aurelle; Moumouni, Ismail; Faure, Guy

    2015-01-01

    Purpose: Approaches to build farmers' analytical capacities are said to trigger wide-ranging changes. This article reports on the communication process between participants and non-participants in one such approach, related to the technical and management skills learned by participants and the changes these participants subsequently made, and the…

  1. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  2. 12 strategies for managing capital projects.

    Science.gov (United States)

    Stoudt, Richard L

    2013-05-01

    To reduce the amount of time and cost associated with capital projects, healthcare leaders should: Begin the project with a clear objective and a concise master facilities plan. Select qualified team members who share the vision of the owner. Base the size of the project on a conservative business plan. Minimize incremental program requirements. Evaluate the cost impact of the building footprint. Consider alternative delivery methods.

  3. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  4. Reducing failures rate within the project documentation using Building Information Modelling, especially Level of Development

    Directory of Open Access Journals (Sweden)

    Prušková Kristýna

    2018-01-01

    Full Text Available Paper´s focus is on differences between traditional modelling in 2D software and modelling within the BIM technology. Research uncovers failures connected to the traditional way of designing and construction of project documentation. There are revealed and shown mismatches within the project documentation. Solution within the Building information modelling Technology is outlined. As a reference, there is used experience with design of specific building in both ways of construction of project documentation: in the way of traditional modelling and in the way when using BIM technology, especially using Level of Development. Output of this paper is pointing to benefits of using advanced technology in building design, thus Building Information Modelling, especially Level of Development, which leads to reducing failures rate within the project documentation.

  5. Considerations on safety against seismic excitations in the project of reactor auxiliary building and control building in nuclear power plants

    International Nuclear Information System (INIS)

    Santos, S.H.C.; Castro Monteiro, I. de

    1986-01-01

    The seismic requests to be considered in the project of main buildings of a nuclear power plant are discussed. The models for global seismic analysis of nuclear power plant structures, as well as models for global strength distribution are presented. The models for analysing reactor auxiliary building and control building, which together with the reactor building and turbine building form the main energy generation complex in a nuclear power plant, are described. (M.C.K.) [pt

  6. A maturation model for project-based organisations – with uncertainty management as an always remaining multi-project management focus

    Directory of Open Access Journals (Sweden)

    Anna Jerbrant

    2014-02-01

    Full Text Available The classical view of multi-project management does not capture its dynamic nature. Present theory falls short in the expositive dimension of how management of project-based companies evolves because of their need to be agile and adaptable to a changing environment. The purpose of this paper is therefore to present a descriptive model that elucidates the maturation processes in a project-based organization as well as to give an enhanced understanding of multi-project management in practice. The maturation model displays how the management of project-based organizations evolves between structuring administration and managing any uncertainty, and emphasizes the importance of active individual actions and situated management actions that haveto be undertaken in order to coordinate, synchronize, and communicate the required knowledge and skills.The outcomes primarily reveal that, although standardized project models are used and considerable resources are spent on effective project portfolio management, how information and communication are executedis essential for the management of project-based organizations. This is particularly true for informal and non-codified communication.

  7. Agile Project Management with Scrum

    CERN Document Server

    Schwaber, Ken

    2009-01-01

    The rules and practices for Scrum-a simple process for managing complex projects-are few, straightforward, and easy to learn. But Scrum's simplicity itself-its lack of prescription-can be disarming, and new practitioners often find themselves reverting to old project management habits and tools and yielding lesser results. In this illuminating series of case studies, Scrum co-creator and evangelist Ken Schwaber identifies the real-world lessons-the successes and failures-culled from his years of experience coaching companies in agile project management. Through them, you'll understand how to

  8. Exploration and Practice of Green Building Management in Sino-Singapore Tianjin Eco-City

    Institute of Scientific and Technical Information of China (English)

    Sun; Xiaofeng; Song; Kun; Liu; Jinxin

    2016-01-01

    This paper summarizes the current development status of green building management in China, and analyzes the problems existing in its present management pattern. It fi rstly introduces the background, procedures and achievements gained during the green building practice in the Sino-Singapore Tianjin Eco-City, expounds the principles and methods of the establishment of the green building management system in this Tianjin Eco-City, and then focuses on practical experience and specifi c measures in separate parts of green building management system in the Tianjin EcoCity, which is constituted by laws, regulations and policies, technical standards, management process, product access, etc. Through exploration and practice, it took 8 years for the Sino-Singapore Tianjin Eco-City to preliminarily establish a set of management systems which were suited to its own characteristics. By introduction of the management system, this paper aims to provide reference for other cities to carry out green building practice and improve the quality of green buildings in China.

  9. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  10. Implicit Knowledge of General Upper Secondary School in a Bridge-building Project

    DEFF Research Database (Denmark)

    Rasmussen, Annette; Andreasen, Karen Egedal

    2016-01-01

    Bridge-building activities are practiced widely in the education systems of Europe. They are meant to bridge transitions between lower and upper secondary school and form a mandatory part of the youth guidance system in Denmark. By giving pupils the opportunity to experience the different...... educational context of upper secondary school, bridge-building activities are meant to facilitate their decision-making on educational paths, but also to attract more and new groups of pupils. However, the premises of the inherent differences of educational contexts and of pupils’ lacking knowledge of upper...... secondary education can be questioned. In this ethnographic case study of a bridge-building project in a rural area in Denmark, we analyse the implicit knowledge of the general upper secondary school, as it is practiced in a bridge-building project, and how it is experienced by the pupils on the background...

  11. Apply Lean Thinking in Project Management

    OpenAIRE

    Pham Ngoc, Lan

    2015-01-01

    The purpose of this thesis was to study the effects of Lean Thinking in Project Management and how applying Lean Project Management could enhance the productivity of project work. The study was carried using theoretical research and collecting empirical data from three interviews and one case study at a local company. At the end of the study, the major project management problems at the company were identified and analyzed following Lean Principles. It was also pointed out where there...

  12. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  13. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  14. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  15. Progress report on decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    International Nuclear Information System (INIS)

    1998-01-01

    The Fernald Environmental Management Project (FEMP), is located about 18 miles northwest of Cincinnati, Ohio. Between 1953 and 1989, the facility, then called the Feed Material Production Center or FMPC, produced uranium metal products used in the eventual production of weapons grade material for use by other US Department of Energy (DOE) sites. In 1989, FMPC's production was suspended by the federal government in order to focus resources on environmental restoration versus defense production. In 1992, Fluor Daniel Fernald assumed responsibility for managing all cleanup activities at the FEMP under contract to the DOE. In 1990, as part of the remediation effort, the site was divided into five operable units based on physical proximity of contaminated areas, similar amounts of types of contamination, or the potential for a similar technology to be used in cleanup activities. This report continues the outline of the decontamination and decommissioning (D and D) activities at the FEMP site Operable Unit 3 (OU3) and provides an update on the status of the decommissioning activities. OU3, the Facilities Closure and Demolition Project, involves the remediation of more than 200 uranium processing facilities. The mission of the project is to remove nuclear materials stored in these buildings, then perform the clean out of the buildings and equipment, and decontaminate and dismantle the facilities

  16. Project management as steppingstone of enterprises

    OpenAIRE

    Andreeva, T.; Petrovska, T.; Tytar, T.

    2011-01-01

    Actual problems of project management in enterprises in order to achieve their goals. The basic members of the organization and implementation of project and the methodology for their implementation. The basic principles of project management are included.

  17. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  18. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  19. Key Performance Indicators for Maintenance Management Effectiveness of Public Hospital Building

    Directory of Open Access Journals (Sweden)

    Farhana Omar Mardhiah

    2017-01-01

    Full Text Available Effectiveness of management in maintenance aspect holds the key element in influencing the performance of overall maintenance management. Similarly, public hospital building needs an effective maintenance management as this type of building in nature is one of the most complex issues in the field of maintenance. Improper building maintenance management adopted by the organization significantly will interrupt the overall operation of the building. Therefore, this paper is aim to identifying the key performance indicator (KPI of effectiveness of maintenance management for the public hospital building. A total of 32 set of questionnaires were distributed to the maintenance manager for each hospital in the northern region of peninsular Malaysia by using self-administration strategy. The survey answer was analyzed by performing descriptive analysis in SPSS. Overall, the result of descriptive analysis shows that all the ten factors of effectiveness of maintenance management are accepted as KPI since the mean value is at least 3.93 which classified as important and significant. The most significant factor of effectiveness of maintenance management is task planning and scheduling with the mean score of 4.35. While less significant factor is identify as maintenance approach with the value of mean score is 3.93. The both results indicates that the management need to have well-structured planning for the maintenance works and also need to embrace the exact strategy of maintenance approach in order to achieved better overall performance of maintenance management. This study may draw a standard practice for the government in assessing the performance of public facilities in terms of maintenance management.

  20. Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model

    Directory of Open Access Journals (Sweden)

    Ming Li

    2017-09-01

    Full Text Available Prefabricated construction, a new direction for the future development of the Chinese construction industry, can maximize the requirements of “green”. As a new form of green building, prefabricated construction is of particular interest. On account of the immature development of the green building market in China, the investment risk for prefabricated construction is higher than for traditional architecture. Hence, it is especially important to improve its investment risk identification and management. This study adopts system dynamics and builds a risk identification feedback chart and risk flow chart, to comprehensively identify investment risks that projects in China may face and to process quantitative estimation of investment risk factors. Key factors influencing project investment risks are found, and corresponding measures are pointedly proposed. This paper may provide guidance and a reference for promoting the sound development of prefabricated construction in China.

  1. Computer image of the new Building 42

    CERN Multimedia

    2008-01-01

    The new Building 42, a new extension to building 40, will make extra space for physicists working on the LHC experiments. The project, which is managed by the TS Civil Engineering Group, will be finished in autumn 2010.

  2. The evolution of the project management

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2009-12-01

    Full Text Available Project management has appeared and developed based on scientific management theory during the '50s-'60s of the last century. After the 1990s of the last century, we can say that project management has truly become an independent discipline, which has a huge impact on the success or failure of companies which are engaged in major projects.

  3. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  4. Incorporating Lean Construction agent into the Building Standards Act: the Spanish case study

    Directory of Open Access Journals (Sweden)

    Brioso Xavier

    2016-12-01

    Full Text Available There is a demand for lean construction in Europe; even though lean construction is still an emerging field and there is growing interest, there are no regulations on this topic. The main objective of this research is to regulate this role when in a project and to define and develop a building agent structure, according to the Building Standards Act (LOE by its acronym in Spanish, to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain, there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, who are defined in the courts as “constructive managers” or similar. For this reason, courts could establish in the future several liabilities for the lean construction specialist and other agents of the project, depending on their actions and based on the implementation of the lean project delivery system, the target value design and the integrated project delivery. Conversely, it is possible that the level of action of the lean construction specialist may comprise design management, construction management and contract management. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the lean construction specialist. The creation of the following agents is proposed: design manager, construction manager and contract manager, definitions that are developed in this study. These agents are loosely defined, because any project manager, building information modeling manager or similar may act as one or as more-than-one of them. Finally, the creation of the lean construction manager is also proposed, as the agent who takes on the role of the design manager, construction manager and contract manager, but focused on the lean production principles.

  5. Developing integrated parametric planning models for budgeting and managing complex projects

    Science.gov (United States)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  6. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  7. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  8. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  9. Demonstrating leadership inside and out : green building project trains employees, educates clients

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-01-15

    This article described a full-scale green renovation project undertaken by a construction management firm in Newton, Massachusetts. Chapman Construction and Design began renovating its own office building in late 2007 and completed it in September 2008. The firm set out to achieve LEED Platinum certification from the United States Green Building Council. The project involved energy saving modifications to its mechanical systems; replacing plumbing fixtures with high efficiency alternatives to reduce water consumption by at least 40 per cent; installing skylights and additional windows to allow more natural light into the interior space; salvaging doors, lighting, metal studs and masonry whenever possible; and using sustainable products such as recyclable carpets, tiles and low-VOC paint. The main feature of the renovation was a new 47 kW (DC) photovoltaic (PV) solar power array installed on the rooftop. The PV array includes 208 panels and a SunPower SPR-225 system that produces 55,000 kWh of clean power per year. This grid connected system will supply 90 per cent of the company's electricity needs. During times of peak production, excess power will be sent back to the utility. This article also described the 3 different roofing systems upon which the PV system was installed. All of the roofing systems were manufactured by the Firestone Building Products Company and included an innovative and highly reflective white thermoplastic polyolefin (TPO) single-ply roofing system; a RubberGard EPDM roofing system that was coated with Firestone's white AcryliTop coating which exceeds Energy Star requirements for energy efficiency; and a 1.5 mm Firestone UltraPly TPO membrane. The easy to install roofing systems were designed to prolong the service life of the roof and reflect solar radiation. 1 ref., 2 figs.

  10. COMPONENTS PROVISION MANAGEMENT FOR MACHINE BUILDING MANUFACTURER

    Directory of Open Access Journals (Sweden)

    Ekaterina P. Bochkareva

    2014-01-01

    Full Text Available In the paper is given an approach to themanagement of components provision formachine building manufacturer based uponinternational standards and best practicesof leading international companies. Thecomplex expertise methods are used forthe development of the proposed machinebuilding manufacturer suppliers’ operational management method. At a strategic level is proposed a tool for planning the suppliers’portfolio and a machine building manufacturer supplier development methodology.

  11. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  12. Demand-side management project for Tenaga Nasional Berhad. Progress report No. 4. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This study, conducted by the California Energy Commission, was funded by the U.S. Trade and Development Agency. Progress Report No. 4 is divided into the following contents: April 6, 1994 Training Mission Delegation Itinerary; April 6, 1994 Training Mission Workshop Information Package; Letter to Chairman of Tenaga Nasional Berhad Requesting Demonstration Project Funding; Design/Build Construction Bid Proposal for Energy Efficient Electric Technology Demontration Project; Final Draft of Demand-Side Management Plan for Tenaga Nasional Berhad; Attachments.

  13. What Will the Neighbors Think? Building Large-Scale Science Projects Around the World

    International Nuclear Information System (INIS)

    Jones, Craig; Mrotzek, Christian; Toge, Nobu; Sarno, Doug

    2007-01-01

    Public participation is an essential ingredient for turning the International Linear Collider into a reality. Wherever the proposed particle accelerator is sited in the world, its neighbors -- in any country -- will have something to say about hosting a 35-kilometer-long collider in their backyards. When it comes to building large-scale physics projects, almost every laboratory has a story to tell. Three case studies from Japan, Germany and the US will be presented to examine how community relations are handled in different parts of the world. How do particle physics laboratories interact with their local communities? How do neighbors react to building large-scale projects in each region? How can the lessons learned from past experiences help in building the next big project? These and other questions will be discussed to engage the audience in an active dialogue about how a large-scale project like the ILC can be a good neighbor.

  14. Organizational structures of companies versus project management effectiveness

    Directory of Open Access Journals (Sweden)

    Joanna Haffer

    2012-12-01

    Full Text Available An organizational structure, indicated as one out of the four main organizational conditions supporting project management, has an essential meaning for project execution. This article, based on the research results, describes different organizational structures of project-orientated enterprises, enumerating their advantages and disadvantages, and reveals the influence of inter-organizational relations on project management effectiveness in enterprises operating in Poland. The results indicate that the more a character of inter-organizational relations is heading towards project structure, the higher project management effectiveness is. In the next sequence the project management processes are supported by strong matrix structures, whereas the worst outcomes are provided by functional structures. Simultaneously, it was concluded that project structures are conducive to high advancement of project management processes, and among them, especially project risk management processes as well as communication, time and cost management processes.

  15. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  16. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  17. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  18. Decommissioning of Active Ventilation Systems in a Nuclear R and D Facility to Prepare for Building Demolition (Whiteshell Laboratories Decommissioning Project, Canada) - 13073

    International Nuclear Information System (INIS)

    Wilcox, Brian; May, Doug; Howlett, Don; Bilinsky, Dennis

    2013-01-01

    Whiteshell Laboratories (WL) is a nuclear research establishment owned by the Canadian government and operated by Atomic Energy of Canada Limited (AECL) since the early 1960's. WL is currently under a decommissioning license and the mandate is to remediate the nuclear legacy liabilities in a safe and cost effective manner. The WL Project is the first major nuclear decommissioning project in Canada. A major initiative underway is to decommission and demolish the main R and D Laboratory complex. The Building 300 R and D complex was constructed to accommodate laboratories and offices which were mainly used for research and development associated with organic-cooled reactors, nuclear fuel waste management, reactor safety, advanced fuel cycles and other applications of nuclear energy. Building 300 is a three storey structure of approximately 16,000 m 2 . In order to proceed with building demolition, the contaminated systems inside the building have to be characterized, removed, and the waste managed. There is a significant focus on volume reduction of radioactive waste for the WL project. The active ventilation system is one of the significant contaminated systems in Building 300 that requires decommissioning and removal. The active ventilation system was designed to manage hazardous fumes and radioactivity from ventilation devices (e.g., fume hoods, snorkels and glove boxes) and to prevent the escape of airborne hazardous material outside of the laboratory boundary in the event of an upset condition. The system includes over 200 ventilation devices and 32 active exhaust fan units and high efficiency particulate air (HEPA) filters. The strategy to remove the ventilation system was to work from the laboratory end back to the fan/filter system. Each ventilation duct was radiologically characterized. Fogging was used to minimize loose contamination. Sections of the duct were removed by various cutting methods and bagged for temporary storage prior to disposition

  19. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  20. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  1. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  2. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  3. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  4. Project Management 2027; The Future of Project Management

    NARCIS (Netherlands)

    Drs. A.J.G. Silvius

    2008-01-01

    This paper describes a study into the expected development of the competences op the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  5. Causes of time overrun of education trust fund building projects in ...

    African Journals Online (AJOL)

    The study surveyed Education Trust Fund building projects in some tertiary institutions in north central Nigeria with the aim of ascertaining the causes of time overrun of these projects. The survey was carried out with the help of a structured questionnaire administered to clients, consultants and contractors' alike.

  6. Integration of Real-Time Data Into Building Automation Systems

    Energy Technology Data Exchange (ETDEWEB)

    Mark J. Stunder; Perry Sebastian; Brenda A. Chube; Michael D. Koontz

    2003-04-16

    The project goal was to investigate the possibility of using predictive real-time information from the Internet as an input to building management system algorithms. The objectives were to identify the types of information most valuable to commercial and residential building owners, managers, and system designers. To comprehensively investigate and document currently available electronic real-time information suitable for use in building management systems. Verify the reliability of the information and recommend accreditation methods for data and providers. Assess methodologies to automatically retrieve and utilize the information. Characterize equipment required to implement automated integration. Demonstrate the feasibility and benefits of using the information in building management systems. Identify evolutionary control strategies.

  7. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  8. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  9. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  10. Project T100 -- Hazardous Materials Management and Emergency Response Training Center (HAMMER)

    International Nuclear Information System (INIS)

    Norton, C.E.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design and construction of the Hazardous Materials Management and Emergency Response (HAMMER) Training Center, project 95L-EWT-100 at Hanford. The reviews and verifications will be on activities associated with design, procurement, and construction of the HAMMER project which includes, but is not limited to earthwork, placement of concrete, laying of rail, drilling of wells, water and sewer line fabrication and installation, communications systems, fire protection/detection systems, line tie-ins, building and mock-up (prop) construction, electrical, instrumentation, pump and valves and special coatings

  11. MEMS - Munich Energy Management System. FIA Project: Exchange of research information; MEMS - Muenchner Energiemanagement-System. FIA-Projekt - Forschungs-Informations-Austausch

    Energy Technology Data Exchange (ETDEWEB)

    Funk, H.; Fries, W.

    2001-10-01

    The City of Munich developed the project 'Munich Energy-Management-Systems (MEMS)' with financial support from the Federal Ministry of Economy and Technology. The project is based on a system of building automation using as many standard elements of hardware and software as possible. This will guarantee a high degree of independence from suppliers and subcontractors. The project has led to a reliable working base for the evaluation, measuring and control for ca. 150 municipal buildings. (orig.) [German] Mit dem Projekt 'Muenchner Energie-Management-System (MEMS)' erstellte die Landeshauptstadt Muenchen mit finanzieller Unterstuetzung des Bundesministeriums fuer Wirtschaft und Technologie ein auf der Leitzentrale Haustechnik (LZH) basierendes zentrales Energiemanagementsystem. Die Verwendung moeglichst vieler Standards in Hard- und Software ist dabei ein wesentlicher Gesichtspunkt. Dadurch wurde eine weitgehende Unabhaengigkeit von einem einzelnen Hersteller erreicht. Damit wurde ein Erfassungs-, Auswerte- und Steuerungssystem fuer derzeit rund 150 staedtische Gebaeude geschaffen. (orig.)

  12. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  13. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  14. Assessment of Carbon Emission Reduction for Buildings Projects in Malaysia-A Comparative Analysis

    Directory of Open Access Journals (Sweden)

    Klufallah Mustafa M. A.

    2014-01-01

    Full Text Available The Malaysian construction industry significantly contributes as an empowerment to its development vision of 2020 by reducing 40% of carbon emission. Moreover, this industry accounts as a threat to the environment, not only in terms of consumption of natural resources but also in emitting million tons of carbon emission annually. In fact, Malaysia is categorized the 30th in the world's ranking in carbon emission level. To mitigate the raise of carbon emission level from the buildings construction, several studies identified some of the effective carbon emission assessment tools for construction projects but it is lack of implementation in Malaysia. The green building index (GBI, Malaysian CIB Report has been introduced to assist the construction stakeholders in reducing the level of carbon emission and the impact of buildings on the environment. This paper presents an analysis of carbon emission from housing projects and office buildings in order to identify and quantify the main sources of carbon emission for each project and it proposes environmental friendly materials as replacement for conventional construction materials to achieve the implementation of sustainability in Malaysia.

  15. Assessment and management of building enterprise development potential

    Directory of Open Access Journals (Sweden)

    Елена Игоревна Угодникова

    2015-11-01

    Full Text Available The article is devoted to the development of the generalized integrated criterion of the evaluation of building enterprise development potential. The developed indicator is based on the potential structuring, accounting weighting factors of each structural elements and the possibility of building enterprise capital raising. The algorithm of the potential evaluation and the scheme of the management of building enterprise development potential with accounting future possibilities and hidden resources of business entities are proposed

  16. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A - Quality assurance plan; Appendix B - Records management plan

    International Nuclear Information System (INIS)

    1997-03-01

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, which is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included

  17. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  18. Identifying intelligent Building Management Systems (BMS) in ...

    African Journals Online (AJOL)

    Identifying intelligent Building Management Systems (BMS) in sustainable housing. ... Journal of Fundamental and Applied Sciences ... attention to the principles of sustainability of energy and organized approach to sustainable development.

  19. An Advanced IoT-based System for Intelligent Energy Management in Buildings.

    Science.gov (United States)

    Marinakis, Vangelis; Doukas, Haris

    2018-02-16

    The energy sector is closely interconnected with the building sector and integrated Information and Communication Technologies (ICT) solutions for effective energy management supporting decision-making at building, district and city level are key fundamental elements for making a city Smart. The available systems are designed and intended exclusively for a predefined number of cases and systems without allowing for expansion and interoperability with other applications that is partially due to the lack of semantics. This paper presents an advanced Internet of Things (IoT) based system for intelligent energy management in buildings. A semantic framework is introduced aiming at the unified and standardised modelling of the entities that constitute the building environment. Suitable rules are formed, aiming at the intelligent energy management and the general modus operandi of Smart Building. In this context, an IoT-based system was implemented, which enhances the interactivity of the buildings' energy management systems. The results from its pilot application are presented and discussed. The proposed system extends existing approaches and integrates cross-domain data, such as the building's data (e.g., energy management systems), energy production, energy prices, weather data and end-users' behaviour, in order to produce daily and weekly action plans for the energy end-users with actionable personalised information.

  20. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  1. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  2. Appraisal of Fire Safety Management Systems at Educational Buildings

    Directory of Open Access Journals (Sweden)

    Nadzim N.

    2014-01-01

    Full Text Available Educational buildings are one type of government asset that should be protected, and they play an important role as temporary communal meeting places for children, teachers and communities. In terms of management, schools need to emphasize fire safety for their buildings. It is well known that fires are not only a threat to the building’s occupants, but also to the property and the school environment. A study on fire safety management has been carried out on schools that have recently experienced fires in Penang. From the study, it was found that the school buildings require further enhancement in terms of both active and passive fire protection systems. For instance, adequate fire extinguishers should be provided to the school and the management should inspect and maintain fire protection devices regularly. The most effective methods to increase the level of awareness on fire safety are by organizing related programs on the management of fire safety involving all staff, teachers and students, educational talks on the dangers of fire and important actions to take in the event of an emergency, and, lastly, to appoint particular staff to join the management safety team in schools.

  3. Buildings energy management program workshop design. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    This document describes activities undertaken by Honeywell's Energy Resources Center for design and development of the format, content, and materials that were used in conducting 129 one-day energy management workshops for specific commercial business audiences. The Building Energy Management Workshop Program was part of a National Workshop Program that was intended to increase awareness of energy-related issues and to encourage energy-conservation actions on the part of commercial and industrial sectors. The total effort included executive conferences for chief executive officers and other senior management personnel; industrial energy-conservation workshops directed at plant management and engineering personnel; vanpooling workshops designed to inform and encourage business in implementing a vanpooling program for employees; and the building energy-management workshops specifically developed for managers, owners, and operators of office and retail facilities, restaurants, and supermarkets. The total program spanned nearly two years and reached approximately 2,500 participants from all parts of the U.S. A detailed followup evaluation is still being conducted to determine the impact of this program in terms of conservation action undertaken by workshop participants.

  4. The role of BIM (Building Information Modeling for representation and managing of built and historic artifacts

    Directory of Open Access Journals (Sweden)

    Carlo Bianchini

    2016-06-01

    Full Text Available It’s established that in the design and construc- tion of new buildings, BIM is a fundamental refe- rence especially when the standardization is the typical character of the project. As Architecture, with the management of the entire building pro- cess, requires standardization for greater eco- nomy, thanks to BIM tools the building process seems to have actually moved to a 2.0 phase; on the contrary, when BIM is applied to historical bu- ildings it still reveals not so adequate. In this framework, this paper will not discuss the differences between CAD and BIM or the un- doubted potential of BIM software from a tech- nical or operational standpoint; we would focus instead on the implication of BIM referring to the Representation disciplines and to the issues con- nected with its application to the existing built stock and especially to historic buildings

  5. The ComSoc guide to managing telecommunications projects

    CERN Document Server

    Desmond, Celia

    2010-01-01

    "This pocket guide provides an overview of the telecommunications environment as it has evolved over the past few years, illustrating the need for project management, the significance of project success to the companies, and the application of key project management processes within the telecom environment. Topics covered include: scope management, time management, cost management, procurement management, risk management, communications, quality, human resources, and Integration. It offers professionals a brief and accessible guide to managing telecommunication projects in the 21st century"--

  6. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  7. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  8. The Challenges and Enhancing Opportunities of Global Project Management: Evidence from Chinese and Dutch Cross-Cultural Project Management

    OpenAIRE

    Zhang, Ying; Marquis, Christopher G; Filippov, Sergey; Haasnoot, Henk-Jan; van der Steen, Martijn

    2015-01-01

    This study investigates the role of national and organisational culture in day-to-day activities of multinational project teams, specifically focusing on differences between Chinese and Dutch project managers. We rely on fieldwork observation and interviews with representatives from a diverse set of organizations in China and the Netherlands. Analyses focus on the impact of cultural differences on five project management processes – (1) project planning, (2) cost and quality management, (3) r...

  9. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  10. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  11. Irregular Shaped Building Design Optimization with Building Information Modelling

    Directory of Open Access Journals (Sweden)

    Lee Xia Sheng

    2016-01-01

    Full Text Available This research is to recognise the function of Building Information Modelling (BIM in design optimization for irregular shaped buildings. The study focuses on a conceptual irregular shaped “twisted” building design similar to some existing sculpture-like architectures. Form and function are the two most important aspects of new buildings, which are becoming more sophisticated as parts of equally sophisticated “systems” that we are living in. Nowadays, it is common to have irregular shaped or sculpture-like buildings which are very different when compared to regular buildings. Construction industry stakeholders are facing stiff challenges in many aspects such as buildability, cost effectiveness, delivery time and facility management when dealing with irregular shaped building projects. Building Information Modelling (BIM is being utilized to enable architects, engineers and constructors to gain improved visualization for irregular shaped buildings; this has a purpose of identifying critical issues before initiating physical construction work. In this study, three variations of design options differing in rotating angle: 30 degrees, 60 degrees and 90 degrees are created to conduct quantifiable comparisons. Discussions are focused on three major aspects including structural planning, usable building space, and structural constructability. This research concludes that Building Information Modelling is instrumental in facilitating design optimization for irregular shaped building. In the process of comparing different design variations, instead of just giving “yes or no” type of response, stakeholders can now easily visualize, evaluate and decide to achieve the right balance based on their own criteria. Therefore, construction project stakeholders are empowered with superior evaluation and decision making capability.

  12. Energy Production System Management - Renewable energy power supply integration with Building Automation System

    International Nuclear Information System (INIS)

    Figueiredo, Joao; Martins, Joao

    2010-01-01

    Intelligent buildings, historically and technologically, refers to the integration of four distinctive systems: Building Automation Systems (BAS), Telecommunication Systems, Office Automation Systems and Computer Building Management Systems. The increasing sophisticated BAS has become the 'heart and soul' of modern intelligent buildings. Integrating energy supply and demand elements - often known as Demand-Side Management (DSM) - has became an important energy efficiency policy concept. Nowadays, European countries have diversified their power supplies, reducing the dependence on OPEC, and developing a broader mix of energy sources maximizing the use of renewable energy domestic sources. In this way it makes sense to include a fifth system into the intelligent building group: Energy Production System Management (EPSM). This paper presents a Building Automation System where the Demand-Side Management is fully integrated with the building's Energy Production System, which incorporates a complete set of renewable energy production and storage systems.

  13. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  14. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  15. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  16. Implementation of a demand elasticity model in the building energy management system

    NARCIS (Netherlands)

    Ożadowicz, A.; Grela, J.; Babar, M.

    2016-01-01

    Nowadays, crucial part of modern Building Automation and Control Systems (BACS) is electric energy management. An active demand side management is very important feature of a Building Energy Management Systems (BEMS) integrated within the BACS. Since demand value changes in time and depends on

  17. Project Management – Multi-perspective Leadership

    DEFF Research Database (Denmark)

    Riis, Eva

    2014-01-01

    Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse......”Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse...

  18. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  19. Open Source and Proprietary Project Management Tools for SMEs.

    Directory of Open Access Journals (Sweden)

    Veronika Abramova

    2017-05-01

    Full Text Available The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management and ERP (Enterprise Resource Planning modules. Currently, a large number of project management software is available, to assist project team during the entire project lifecycle. We present the main differences between open source and proprietary project management tools and how those could be important for SMEs, describing the key features and how those can assist the project manager and the development team. In this paper, we analyse four open-source project management tools: OpenProject, ProjectLibre, Redmine, LibrePlan and four proprietary tools: Bitrix24, JIRA, Microsoft Project and Asana.

  20. The One-Page Project Manager Comunicate and Manage Any Project With a Single Sheet of Paper

    CERN Document Server

    Campbell, Clark A

    2007-01-01

    The One-Page Project Manager shows you how to boil down any project into a simple, one-page document that can be used to communicate all essential details to upper management, other departments, suppliers, and audiences. This practical guide will save time and effort, helping you identify the vital parts of a project and communicate those parts and duties to other team members.