WorldWideScience

Sample records for building maintenance

  1. Building Maintenance Management System for Heritage Museum

    OpenAIRE

    Md Azree Othuman Mydin; Siti Hajar Ismail; Norhidayah Md Ulang

    2012-01-01

    An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, ...

  2. Building Maintenance Management System for Heritage Museum

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2012-09-01

    Full Text Available An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, category, location, and ownership. This study focuses on Building Maintenance Management System for Heritage Museum, which consists of two case studies in Penang State Museum and Art Gallery, Malaysia and Museum of Perak, Malaysia. The aim of this study is to propose methods to improve the maintenance management system for heritage museum. From the results, the common problem occurs during the implementation for the maintenance of each building is the budget for the maintenance and worker’s skill. The department of each museum must have their own maintenance unit to keep an eye on the maintenance activities for their buildings in order to improve the maintenance management system in their building.

  3. Urban heritage, building maintenance: foundations

    NARCIS (Netherlands)

    Verhoef, L.G.W.

    1999-01-01

    What do we understand by the term 'foundations'? This general idea may embody the literal ' groundwork' that provides support for a building and may possibly include the entire structural works that serve to pre vent subsidence. Remarkably, in this definition the word 'groundwork' incorporates both

  4. Urban heritage, building maintenance: foundations

    OpenAIRE

    Verhoef, L.G.W.

    1999-01-01

    What do we understand by the term 'foundations'? This general idea may embody the literal ' groundwork' that provides support for a building and may possibly include the entire structural works that serve to pre vent subsidence. Remarkably, in this definition the word 'groundwork' incorporates both the 'ground' itself and the structural 'works'. Ground itself is a general word for the usually layered formations containing elements such as sand, clay peat and silt deposited beside each other o...

  5. Operation and maintenance of the technical installations in buildings

    DEFF Research Database (Denmark)

    Nielsen, O.(red.)

    The report contains twelve papers from a seminar on operation and maintenance, held at the Danish Building Research Institute in October 1976. The papers deal, among other things, with dimensioning and balancing of pipesystems, design of ventilating systems for adequate operation and maintenance......, cost and quality in maintenance, maintenance service companies, as well as organization and training for building services maintenance....

  6. Quantitative Analysis of Criteria in University Building Maintenance in Malaysia

    OpenAIRE

    Olanrewaju Ashola Abdul-Lateef

    2010-01-01

    University buildings are a significant part of university assets and considerable resources are committed to their design, construction and maintenance. The core of maintenance management is to optimize productivity and user satisfaction with optimum resources. An important segment in the maintenance management system is the analysis of criteria that influence building maintenance. Therefore, this paper aims to identify quantify, rank and discuss the criteria that influence maintenance costs,...

  7. Significance of Building Maintenance Management Systems towards Sustainable Development

    Directory of Open Access Journals (Sweden)

    M.A. Othuman Mydin

    2014-05-01

    Full Text Available Building maintenance management is an organized and effective system of maintenance operations which is set up to deal with problems related to the upkeep of a building. Its goal, aside from locating and remedying a building’s deficiencies, is to effectively minimize the overall costs of maintenance and is also an effort to maximize the gain and benefits from the savings. There are a few factors that influence decisions to undertake maintenance work. The principal goal of maintenance is to protect a building in the early stage of issues as they arise. Some major reasons for maintaining a building include retaining its reputation and value of investments, maintaining the building in a condition which allows it to accomplish its purpose, and presenting a good outer shell. This paper will review and discuss some of the major elements of building maintenance towards achieving sustainable buildings.

  8. Quantitative Analysis of Criteria in University Building Maintenance in Malaysia

    Directory of Open Access Journals (Sweden)

    Olanrewaju Ashola Abdul-Lateef

    2010-10-01

    Full Text Available University buildings are a significant part of university assets and considerable resources are committed to their design, construction and maintenance. The core of maintenance management is to optimize productivity and user satisfaction with optimum resources. An important segment in the maintenance management system is the analysis of criteria that influence building maintenance. Therefore, this paper aims to identify quantify, rank and discuss the criteria that influence maintenance costs, maintenance backlogs, productivity and user satisfaction in Malaysian university buildings. The paper reviews the related literature and presents the outcomes of a questionnaire survey. Questionnaires were administered on 50 university maintenance organizations. Thirty-one criteria were addressed to the university maintenance organizations to evaluate the degree to which each of the criteria influences building maintenance management. With a 66% response rate, it was concluded that the consideration of the criteria is critical to the university building maintenance management system. The quality of components and materials, budget constraints and the age of the building were found to be the most influential criteria but information on user performance satisfaction, problems associated with in-house workforce and shortage of materials and components were the least influential criteria. The paper also outlined that maintenance management is a strategic function in university administration.

  9. Masonry. Teacher's Guide. Building Maintenance Units of Instruction.

    Science.gov (United States)

    Barnes, Bill

    This teaching guide on masonry building maintenance, one in a series of six publications designed for building maintenance instructors in Texas, is designed to give students an understanding of masonry construction. Introductory material provides teachers with information on use of the units of instruction and personalization and localization of…

  10. Building Maintenance in Old Buildings Conservation Approach: An Overview of Related Problems

    OpenAIRE

    Brit Kayan

    2006-01-01

    Building maintenance in conservation of old buildings is one of the approaches applied within the built environment of Malaysia. For instance, it is realised that these old buildings contribute an important significance to our nation's priceless heritage and unique historical development. However, most of these buildings' maintenance is influenced by related problems that affect the overall building conservation approach. Therefore, these old buildings face problems which greatly affect their...

  11. A CMMS Expert using BIM for IBS Building Maintenance

    Directory of Open Access Journals (Sweden)

    Hamzah Noraini

    2016-01-01

    Full Text Available In the IBS building maintenance, the conventional methods to the project delivery and its failure to form effective communication channel between complementary knowledge on IBS construction and related members that is conducted in the sequential manner has resulted in ineffectiveness for managing building maintenance, where a paradigm shift within the IBS traditional approach is necessary. The research results described are concerned with i an integrated system to record, diagnose and analyse information for IBS building maintenance to detect patent or latent defect, select an effective repair method, provide appropriate planning decision and reduce risks of defect throughout the building lifetime. ii building a decision making support in diagnosis in IBS building maintenance based on robust data collection about concrete defects and causes including in the selection of a durable replacement design and material or the proper rehabilitation method. The system development was based on analysis of number of interviews and case studies conducted with professional engineers working in IBS building maintenance departments. The paper concludes that implementing a CMMS Expert using BIM can help improve the performance of IBS building design, construction and maintenance operations.

  12. Do-It-Now building maintenance reengineering project

    Energy Technology Data Exchange (ETDEWEB)

    Apoddaca, L.; Ayotte, A.; Coffman, J.; Dukes, L.; Jojola, S.; Kadlec, J.; Letourneau, S.; Matthews, R.; Paul, G.

    1996-09-01

    The Do-It-Now (DIN) building maintenance system is proposed to reduce the cost of routine building maintenance and repairs and to improve customer satisfaction with maintenance services. DIN uses a team approach to periodically inspect buildings and provide maintenance services on the spot. It emphasizes communications between the customers and the craftspeople performing the work. The system was designed using a reengineering approach that characterized the existing maintenance work control system, analyzed comparable systems in other DOE laboratories, envisioned an ideal system, and proposed a workable, testable system for initial implementation. At each stage, input was solicited from customer representatives and Facilities management to ensure meeting customer requirements with an implementable system.

  13. Maintenance of the telephone exchange in building 40

    CERN Multimedia

    2006-01-01

    In order to secure the power supply of the telephone exchange in building 40, a maintenance will be done on the 18th of December from 7.30 am to 8 am. During this intervention, the fixed telephony services in building 39 and 40 will be interrupted. The fixed telephony services in other CERN buildings won't be affected by this maintenance. The mobile telephony services (GSM) won't be affected. For more details, please send your questions to Standard.Telephone@cern.ch Telecom Services IT/CS

  14. Maintenance of the telephone exchange in building 40

    CERN Multimedia

    2006-01-01

    In order to secure the power supply of the telephone exchange in Building 40, maintenance work will be done on 18th December from 7.30 am to 8 am. During this intervention, the fixed telephone services in Building 39 and 40 will be interrupted. The fixed telephone services in other CERN buildings will not be affected by this maintenance. The mobile telephone services (GSM) will not be affected. For more details, please send your questions to Standard.Telephone@cern.ch Telecom Services IT/CS

  15. Building Maintenance in Old Buildings Conservation Approach: An Overview of Related Problems

    Directory of Open Access Journals (Sweden)

    Brit Kayan

    2006-12-01

    Full Text Available Building maintenance in conservation of old buildings is one of the approaches applied within the built environment of Malaysia. For instance, it is realised that these old buildings contribute an important significance to our nation's priceless heritage and unique historical development. However, most of these buildings' maintenance is influenced by related problems that affect the overall building conservation approach. Therefore, these old buildings face problems which greatly affect their overall condition and performance: building structure; building appearance and aesthetic; building materials and building character. In most critical situations, there is a greater possibility that we could lose the cultural significance and heritage values of these old buildings through ignoring the related problems. This paper tries to identify the related problems, reveal the findings and discuss suitable approaches to conserving these old buildings.

  16. Study on Maintenance Practices for School Buildings in Terengganu and Kedah, Malaysia

    OpenAIRE

    Mohammad Ropi R.; Tabassi A.A.

    2014-01-01

    Malaysia initiated talks on building maintenance in 1971 during the Second Malaysia Plan of 1971-1975. Later, the government introduced the Building and Common Property (Maintenance and Management) Act, 2007 to provide proper maintenance and management of buildings. School buildings are one of the important facilities for basic knowledge in everyday life. Accordingly, the maintenance of school buildings, which serve staff and students, needs considerable attention as effective maintenance pro...

  17. Key Performance Indicator of Building Maintenance and Its Effect on the Building Life Cycle

    Directory of Open Access Journals (Sweden)

    M.A. Othuman Mydin

    2014-07-01

    Full Text Available Building maintenance is considered as one of the national agenda. Multitude barriers received by the services providers have undergone various difficulties in satisfying public interest have been progressively resolved as a sign towards becoming a more developed country. In real practice, building maintenance is the thing which we mostly tolerate. If the building is able to weather the elements, we may with delay taking action on it. Most buildings are always treated with ‘ad-hoc’ maintenance. In some instances, the building disrepair will wait until complaints are made before any repair work is done. It shows that the situation is not considered critical as it may. Maintenance is still being practiced in improper procedure by the maintenance managers which subsequently caused bad impacts to the facilities and the services provided. It can be seen that the managers prefer carrying out reactive maintenance works rather than proactive works and at times do not consider the clients satisfaction and also the performance of services. This paper will focus on some important elements of building maintenance and its relation to building performance holistically.

  18. Importance of building maintenance at the time of architectural design of buildings rehabilitated with heritage value

    Institute of Scientific and Technical Information of China (English)

    Rui Calejo Rodrigues; Patrícia Fernandes Rocha

    2011-01-01

    During architectural conception phase,building maintenance problematic is mostly a result of the unintentional use of preconceived architectonical solutions rather than a consequence of a specific influence of maintenance requirements.Hardly the architect in the act of design understands the importance of these solutions in the service life span of a building.Being aware of this,is it possible for the architect to be supplied with a decision support system that allows him to consider the implications of building maintenance since the early design phases? Having awareness of this problem and its consequences in the early design phases a research project was started at the Faculty Engineering of the University of Oporto(FEUP),under which the implications of building maintenance in the act of architectural design is studied.This article presents the methodology developed to identify the needs of maintenance of buildings based on a DSS-decision support system that provides simple tools the architect can use in design phase.This methodology is based on decomposition of building parts-Elements Source of Maintenance ESM-,and subsequently,a set of functional requirements that determine the performance regarding building maintenance on account of architectural decisions.Relevant maintenance actions are defined:Inspection,Pro-action,Cleaning,Correction,Replacement,Legal enforcement,Limits of use.One can thus set up a relationship between the act of design and its performance framework based on behavior,intervention and the ownership of the work of architecture.Using a Multicriteria Analysis (MCA) a qualitative evaluation of different options based on maintenance requirements accomplishment.Conclusions on the importance of architectural conception concerning the building maintenance were clearly arrived at and the utility of the developed decision support tool was also highlighted.

  19. Sustainable construction building performance simulation and asset and maintenance management

    CERN Document Server

    2016-01-01

    This book presents a collection of recent research works that highlight best practice solutions, case studies and practical advice on the implementation of sustainable construction techniques. It includes a set of new developments in the field of building performance simulation, building sustainability assessment, sustainable management, asset and maintenance management and service-life prediction. Accordingly, the book will appeal to a broad readership of professionals, scientists, students, practitioners, lecturers and other interested parties.

  20. Masonry Procedures. Building Maintenance. Module V. Instructor's Guide.

    Science.gov (United States)

    Eck, Francis

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for a masonry procedures unit containing eight lessons. Lesson topics are masonry safety practices; set forms; mix concrete; patch and/or repair concrete; pour and finish concrete; mix…

  1. Maintenance of Heritage Building: A Case Study from Ipoh, Malaysia

    Directory of Open Access Journals (Sweden)

    Tan Seong Yeow

    2016-01-01

    Full Text Available Heritage buildings represent the tangible cultural heritage of a community. However, many of the heritage buildings have being left neglected. Ipoh as a city rich in heritage, has many dilapidated heritage buildings which are experiencing a resurging interest. However, the problems faced by many owners are the lack of technical information of such buildings, leading to premature abandonment and demolition. Therefore, the objectives of this study are to determine the types and extent of defects present in the building studied. To achieve these objectives, a case study of a century old heritage property in Ipoh, Perak was conducted. The study aims to provide reference to owners and those responsible for the conservation of heritage buildings with similar conditions to identify and prioritize critical defects in relation to the building life span to determine its condition. The findings determined the probable causes of defects such as settlement and façade cracks, which are over 30 years old, were attributed to leaking plumbing pipes, rainwater ingress and the construction of an adjacent 20 story apartment building. The major issues to address were stabilizing the foundation through cement grouting, reinforcing the existing structural systems and roof systems as well as arresting the decay of timber floor structure. In conclusion, major maintenance guidelines are need to address structural issues and weather tightness of the building envelope, especially its roof and drainage systems.

  2. Biomimetic Architecture in Building Envelope Maintenance (A Literature

    Directory of Open Access Journals (Sweden)

    Agus Salim N.A.

    2014-01-01

    Full Text Available The study of biomimetic architecture on building envelope is the main structure of this research. The concept is believed more sustainable and efficient for energy saving, operating cost consumption, waste recycle and design renewal in the future. The inspiration from the nature developed the intention on this study to explore on what and how this concept to overcome the problems through design. Biomimicry does catch the attention of human to study more on the system and function of its nature course. The designers are not exception influenced by this concept when the form, shape, texture and colour inspired them in their design. The domination of building form will affect the building envelope as the skin of the structure. A clear impact on building failure is begun with building envelope appearance without a proper maintenance. The faults in building design place a heavy burden on the building for the rest of its operational life and there is no compensation for it. In such situations, the responsibility falls on the shoulders of the designer.

  3. Operational tools for maintenance and renewal of school buildings patrimony

    Directory of Open Access Journals (Sweden)

    Massimo Lauria

    2015-04-01

    Full Text Available The main mission the School system is investing enormous resources into, is the maintenance and energy retrofit in our country, Italy. Firstly what is needed in order to control this fundamental passage are actions aimed at making use of the level of knowledge of the present state of the building patrimony which is more often than not superficial and badly explained. Analogue problems characterise the School patrimony in the Province of Reggio Calabria, Italy. An experimental task has been carried out on a sample school which chose to concentrate their efforts on the information technology area, its structure, transferral and use. The aim of the task was to define the required support tools in order to be able to orientate the building renovation activities and its management.

  4. Performance Assessment of Maintenance Practices in Government Office Buildings: Case Study of Parcel E, Putrajaya

    Directory of Open Access Journals (Sweden)

    Awg Husaini A.I.

    2014-03-01

    Full Text Available Building maintenance practices must be taken into consideration by building facility managers or building owners. They involve daily operations to ensure that end users can work or live comfortably and safely. Through effective maintenance practices, the functions of the existing building facilities can be maintained and meet the needs of the building users. Maintenance practices must be effective in aspects such as planning, organization and supervision in order to maintain the building at a satisfactory level of performance all the time. A study was conducted on a Federal government office building in Parcel E, Putrajaya to determine the maintenance aspects of the management of the facility. To achieve the objectives of this study a questionnaire survey was used to obtain the required data. The outcomes indicate that the aspects of building maintenance practice and the effectiveness of the maintenance management in government office buildings can influence the satisfaction of the end user. However, some aspects of the current building maintenance practices seem to need improvements in order to enhance the building maintenance management. The recommendations of this study will help in the effective management of the facility and maintenance management practices.

  5. Building 9401-2 Plating Shop Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S

  6. Emergy analysis of building manufacturing, maintenance and use: Em-building indices to evaluate housing sustainability

    Energy Technology Data Exchange (ETDEWEB)

    Pulselli, R.M.; Simoncini, E.; Pulselli, F.M.; Bastianoni, S. [Department of Chemical and Biosystems Sciences, University of Siena, Siena (Italy)

    2007-07-01

    In recent years, integrated building design practices based on the definition of 'green building' criteria as common standards of measurement have been promoted. For example, Green Building Rating Systems such as LEED (US) and BREEAM (UK) provide national standards for developing high-performance sustainable buildings. However, integrated environmental accounting methods and global sustainability indicators are still required to evaluate the general environmental performances of buildings, because housing is greatly concerned with global environmental problems such as the use of non-renewable energy, the overexploitation of materials, the exhaustion of resources and the wasting of energy. In this work, an emergy (spelled with an 'm') analysis has been applied to a building to account for the main energy and material inflows to the processes of building manufacturing, maintenance and use. Building materials, technologies and structural elements have been measured and compared to each other in order to evaluate their impacts and to provide a basic calculation that may be used for evaluation and selection. A comprehensive appraisal of the building industry is then expected through a series of synthetic indices. Results represent a source of information that will also be useful for future studies on the urban and regional scale. (author)

  7. Study on Maintenance Practices for School Buildings in Terengganu and Kedah, Malaysia

    Directory of Open Access Journals (Sweden)

    Mohammad Ropi R.

    2014-03-01

    Full Text Available Malaysia initiated talks on building maintenance in 1971 during the Second Malaysia Plan of 1971-1975. Later, the government introduced the Building and Common Property (Maintenance and Management Act, 2007 to provide proper maintenance and management of buildings. School buildings are one of the important facilities for basic knowledge in everyday life. Accordingly, the maintenance of school buildings, which serve staff and students, needs considerable attention as effective maintenance protects capital investment, ensures the health and safety of the children, and supports educational performance. Based on a combination of literature survey and questionnaire appraisal, this study evaluates the maintenance practices in designated schools in Malaysia. Overall, the study showed that most of the school buildings do not possess their own maintenance management practices. Moreover, no preventive or planned maintenance was observed, and only emergency maintenance was applied when necessary. The study recommends the implementation of planned maintenance practices, which will be more effective than unplanned maintenance, mostly because of the reduction in repair costs.

  8. Assessment of Operational Maintenance in Public Hospitals Buildings in the Gaza Strip

    Directory of Open Access Journals (Sweden)

    Adnan Enshassi

    2015-01-01

    Full Text Available The issue of public hospitals buildings’ maintenance in Palestine is regarded as a challenging issue. The lack of attention to maintenance management in hospitals has led to deterioration of buildings and reduced the health care services. The aim of this paper is to assess the current practice of maintenance process and management in public hospitals buildings in the Gaza Strip. A questionnaire survey that distributed to 13 public hospitals, which are administered by the Ministry of Health (MoH in the Gaza Strip, was used to collect the primary data for this study. The results of this study present an overview of the current situation of the maintenance process in public hospitals buildings in the Gaza Strip. The findings indicated that while the corrective maintenance is implemented in all the 13 public hospitals, preventive maintenance is employed along with corrective maintenance, only in three hospitals. In addition, the findings indicated variances in responding to maintenance requests, while 50% of the maintenance departments took few hours to respond to maintenance requests, the rest took a few days to respond, this can be explained due to lack of spare parts and qualified staff. The study showed also that there is a shortage in training the hospital facility’s users on how to report maintenance problems. The results of this study indicated that most hospitals in the Gaza Strip have no maintenance plan for medical equipment; they do not have quality control system for repair and preventive maintenance. It is recommended to employ experience maintenance staff in order to prepare adequate maintenance plan and detailed check list, which is required for preventive maintenance. The MoH should organize specialized training courses in maintenance management for their staff in order to improve their effectiveness and efficiency. Hospitals in Gaza should make sure that all spare parts available in their storages for immediate action when

  9. Analysis and Development of the Generic Maintenance Management Process Modeling for the Preservation of Heritage School Buildings

    OpenAIRE

    A Z. A. Akasah; B. M. Alias

    2009-01-01

    Preservation of heritage school buildings requires special maintenance management practices. A thorough understanding of the maintenance management process is essential in ensuring effective maintenance practices can be instituted. The aim of this paper was to develop a generic process model that will promote the understanding of an effective management of maintenance process for heritage school buildings. A process model for the Maintenance Management of Heritage School Buildings (MMHSB) was...

  10. A Study to Compare the Cost of Operation and Maintenance in Green Building Index (GBI) and Non-Green Building Index (Non-GBI) Rated Building in Malaysia

    OpenAIRE

    Ping Lee Zheng; Chen Chu Hui

    2016-01-01

    Urges for sustainable development had pushed the government and professional bodies to respond and react by implementing regulations where possible to direct development in that manner. However, the outcome in most financial conferences and dialogues on sustainable buildings flagged on high construction and maintenance cost. Thus, this study is conducted to collect and analyze actual building operation and maintenance cost between GBI and Non-GBI rated buildings in Malaysia which are more tha...

  11. Maintenance of Heritage Building: A Case Study from Ipoh, Malaysia

    OpenAIRE

    Tan Seong Yeow; Olanrewaju Abdullateef; Lee Lim Tat

    2016-01-01

    Heritage buildings represent the tangible cultural heritage of a community. However, many of the heritage buildings have being left neglected. Ipoh as a city rich in heritage, has many dilapidated heritage buildings which are experiencing a resurging interest. However, the problems faced by many owners are the lack of technical information of such buildings, leading to premature abandonment and demolition. Therefore, the objectives of this study are to determine the types and extent of defect...

  12. A Study to Compare the Cost of Operation and Maintenance in Green Building Index (GBI and Non-Green Building Index (Non-GBI Rated Building in Malaysia

    Directory of Open Access Journals (Sweden)

    Ping Lee Zheng

    2016-01-01

    Full Text Available Urges for sustainable development had pushed the government and professional bodies to respond and react by implementing regulations where possible to direct development in that manner. However, the outcome in most financial conferences and dialogues on sustainable buildings flagged on high construction and maintenance cost. Thus, this study is conducted to collect and analyze actual building operation and maintenance cost between GBI and Non-GBI rated buildings in Malaysia which are more than 2 years fully operated buildings. There are two categories of selected buildings which are residential and non-residential type of building. Each category of the building consists of similar building’s characteristic such as geographic location, mode of operation, building heights, total numbers of floors and units. The scope of building’s maintenance for this study is mainly on wear and tear of the wall painting, electrical light fittings, ceiling panels, roofing system and mechanical services like water pump system are recorded for their replacement frequency of service and the cost involved within a consistent period of 12 months operation at cost percentage saving of 78.9% and 40.4% for residential and non-residential buildings respectively compare against Non-GBI rated buildings. Electricity consumption for GBI rated buildings are lower than Non-GBI rated buildings which recorded at the cost variance of 23.8% and 6.3% and water consumption at 35.9% and 44.0% for the above mentioned two main categories of selected case study buildings. Results from this study conclude major savings on residential buildings category in term of maintenance cost and electricity consumption for GBI rated buildings. Whereby, non-residential category of buildings, GBI rated building had been proven to obtain significant savings in terms of maintenance cost and water consumption.

  13. Study on Significant Mechanisms of Maintenance Culture Among Public Building Users in Malaysia

    Directory of Open Access Journals (Sweden)

    Binti Rusli Ezzatul Aifa

    2014-01-01

    Full Text Available Malaysia, a country in Asia, is a fast-growing developing country in its construction so as to fulfil the demands of today. Many buildings, infrastructures and facilities were constructed; however, the necessary support required after construction was disregarded. Maintenance is the key for the system, and culture is the main point of attitude and behaviour towards the maintenance culture. Becoming one of the first class infrastructures in the world is the vision that Malaysia is striving to achieve, and a third mentality from society and organisations should be avoided. However, to achieve this vision, proper maintenance is not enough; a maintenance culture should be applied. Developing a maintenance culture will help obtain the vision quickly and increase the quality of productivity in maintenance. It will also reduce the repair cost and increase responsibility. Malaysia is becoming a first class infrastructure, which is the vision for today; therefore, it needs to avoid a third mentality. Concerning this matter, decisive components of the maintenance culture were studied to identify the types of components that influence the maintenance culture among public building users. The decisive components of maintenance were uncertainty awareness and responsibility; personality/human behaviour and attitude; mind-set/motivation; training; knowledge and learning process; culture trends; management commitment; management of organisation; leadership; fundamental and policy; operating system organisation; the enforcement; laws and rules; and current practice of maintenance methods.

  14. Building maintenance processes and practices the case of a fast developing country

    CERN Document Server

    Olanrewaju, Abdul Lateef

    2015-01-01

    This book is designed to be an inclusive for the best practice approach to building maintenance management, where the processes, procedures and operational systems meet a high standard of professional and academic competence. It offers a different perspective on building maintenance management by presenting the schematic building maintenance value chain model and it’s implementation in Malaysian university buildings. The findings show an improvement to building performance, lower maintenance cost, building sustainability and increased maintenance service user satisfaction. The learning outcomes and summaries provided for each chapter and the extensive use of tables and figures add to the readability of the text. Though the book is based on data from Malaysia, it is useful for a much wider audience, and the informal writing style makes it an interesting reference source. This book is valuable for readers who are practitioners, professionals and for academic institutions that offer courses in the build...

  15. The Importance of On-Going Maintenance in Preserving the Heritage Listed Buildings

    Directory of Open Access Journals (Sweden)

    M.A.A. Rahman

    2012-01-01

    Full Text Available Maintenance is not only important in ensuring the condition and physical of the old building to operate safely and effectively, but it also for an activity that is important in determining the life long of the building, so that it can be preserve and be inherit by the next generation. The need of maintenance is not only on repairing but more towards prevention method. According to the previous study, maintenance is done reactively; this further will cost serious problems in future. Therefore maintenance need good planning from the early stage and is followed with on-going implementation from time to time by all those who are responsible in it. In conjunction with this, this paper is to discuss about the importance of on-going maintenance in order to manage the old building after it has been gazette as heritage listed. At the end of the discussion, several strategies have been put forward in order to stimulate the practice of on-going maintenance as an initiative to encourage the culture of maintenance and also help to increase the quality process in a more effective maintenance management.

  16. Integrated management of information inside maintenance processes. From the building registry to BIM systems

    Directory of Open Access Journals (Sweden)

    Cinzia Talamo

    2014-10-01

    Full Text Available The paper presents objec- tives, methods and results of two researches dealing with the improvement of integrated information management within maintenance processes. Focusing on information needs regarding the last phases of the building process, the two researches draft approaches characterizing a path of progressive improve- ment of strategies for integration: from a building registry, unique for the whole construction process, to an integrated management of the building process with the support of BIM systems.

  17. 29 CFR 1910.66 - Powered platforms for building maintenance.

    Science.gov (United States)

    2010-07-01

    ... suspended scaffolds used for construction work and covered under subpart L of 29 CFR part 1926. Building... lifting capacity of the hoist. (A) The primary brake shall be directly connected to the drive train of the... electrical wiring shall be of such capacity that when full load is applied to the equipment power circuit...

  18. Study on Significant Mechanisms of Maintenance Culture Among Public Building Users in Malaysia

    OpenAIRE

    Binti Rusli Ezzatul Aifa; Othuman Mydin Md Azree; Abdullah Shardy

    2014-01-01

    Malaysia, a country in Asia, is a fast-growing developing country in its construction so as to fulfil the demands of today. Many buildings, infrastructures and facilities were constructed; however, the necessary support required after construction was disregarded. Maintenance is the key for the system, and culture is the main point of attitude and behaviour towards the maintenance culture. Becoming one of the first class infrastructures in the world is the vision that Malaysia is striving to ...

  19. Maintenance

    OpenAIRE

    Leightner, Jonathan E.

    2001-01-01

    Maintenance and production interact. The ideal way of accounting for this interaction, when estimating production functions, is by picking the temporal length of observations so that they embed integer multiples of the production—maintenance cycles for all inputs. In contrast to labor and land, the production—maintenance cycles of capital sometimes vary tremendously in temporal length, which can make it impossible to implement the ideal method of accounting for the interaction between mainten...

  20. Biomimetic Architecture in Building Envelope Maintenance (A Literature)

    OpenAIRE

    Agus Salim N.A.; Mydin M.A.O; Ulang N. H. Md.

    2014-01-01

    The study of biomimetic architecture on building envelope is the main structure of this research. The concept is believed more sustainable and efficient for energy saving, operating cost consumption, waste recycle and design renewal in the future. The inspiration from the nature developed the intention on this study to explore on what and how this concept to overcome the problems through design. Biomimicry does catch the attention of human to study more on the system and function of its natur...

  1. Plant and equipment division laboratory services series: a ten-year building-maintenance cost history

    International Nuclear Information System (INIS)

    Maintaining a multifacility national laboratory in a safe, reliable condition is a complex management responsibility in terms of budgets, costs, and proper utilization of personnel and material resources. Increasing wage rates and material costs, combined with decreased budgets and aging facilities, create unusual challenges to maintenance managers. A ten-year history of building-maintenance costs, a brief description of the maintenance program, analyses of personnel requirements, cost increase indexes, unit costs, cost controls, procedures, and a brief discussion of alterations and improvements are presented

  2. Construction of 'Monju' maintenance and waste disposal building by Shimizu Corporation

    International Nuclear Information System (INIS)

    The scale of the building, the use, the outline of construction works and the construction processes of the maintenance and waste disposal building among the facilities of the fast breeder prototype reactor 'Monju' are described, and the construction technology which was adopted for ensuring the quality, the construction period and the safety, the state of carrying out quality assurance activity and so on are reported. Moreover, the building works and the electricity works are mentioned, and the examples that were devised on building side for smoothly advancing later electricity side works are introduced, further, as a feature work, the work of erecting the steel framework that constitutes the large space for repair area is explained. The arrangement of buildings, and the scale and the structure of the maintenance and waste disposal building which is a reinforced concrete building, partly steel framework reinforced concrete building, with four stories above ground and four stories underground and the total floor area of 14,354m2 are described. Liquid waste treatment and washing facilities are in underground, and repair area, solid waste treatment and electric and air conditioning facilities are on above ground floors. (K.I.)

  3. A strategic value management approach for energy and maintenance management in a building

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran

    2015-05-01

    Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.

  4. A Guide to Energy Efficient Refurbishment. Maintenance and Renewal in Educational Buildings. Building Bulletin 73.

    Science.gov (United States)

    Department for Education and Employment, London (England). Architects and Building Branch.

    With little or relatively modest investment, schools being refurbished or undergoing maintenance can make disproportionately large gains in energy efficiency that can also result in large financial savings. This document offers guidance on the selection of appropriate measures that can improve a facility's energy efficiency, depending on the type…

  5. Maintenance as a Guarantee for Roofing Performance in Buildings with Heritage Value

    Directory of Open Access Journals (Sweden)

    Patrícia Fernandes Rocha

    2016-04-01

    Full Text Available This paper is the result of the research conducted at the University of Porto and follows up on the Ph.D. thesis developed by the second author, which deals with the issue of the non-inclusion of maintenance at the time of architectural design, and of support instruments for the project author to help him in this endeavor. This work is intended to apply a guiding methodology to the design process that includes building maintenance benchmarked by the service behavior with regard to pitched roofs. The development of a decision support model enabled to obtain a maintainability index (MI to be identified and results from the combination of two indicators: the importance indicator (Iid and the easiness indicator (Eid. The results achieved enable the project author to have a support tool for making decisions that affect the building behavior in service as well the act of the preservation of heritage value.

  6. Model of work management in the operating organization for the maintenance of building systems

    Directory of Open Access Journals (Sweden)

    T.N. Soldatenko

    2013-03-01

    Full Text Available Known methods of work management for the maintenance of engineering systems of buildings and structures do not fully take into account results of forecasting of physical wear of systems and the operating organizations possibilities. Such methods do not allow forming the production program considering an actual state of building systems and restriction on resources of various types.Relevance of the offered approach consists in jointly using the individual forecasting results of physical wear of building system and financial streams indicator in model of economic performance of management productivity of this system, and also the following optimization of the production program of the operating organization in the form of a binary mathematical programming problem.The purpose of the work is to increase the efficiency of decision-making at justification of types of work management for the maintenance of building systems. The goal is reached by using the device of analytical and probabilistic forecasting of trend of building system condition and formation of an expression for average balance in function not only from indicators of a financial stream, but also from level of physical wear of object. It is offered to consider the received ratio as criterion function of binary programming problem in which required variables are indicators of a choice of the appropriate work of the engineering system maintenance. The described approach was checked by settlement approbation as applied to formation of the production program of the operating organization, optimum by criterion of a maximum of economic productivity and restrictions on finances and time, and showed the working capacity. On the basis of these results the conclusions are drawn on the area and conditions of application of the developed algorithms and models.

  7. Maintenance and Energy Optimization of Lighting Systems for the Improvement of Historic Buildings: A Case Study

    Directory of Open Access Journals (Sweden)

    Ferdinando Salata

    2015-08-01

    Full Text Available Proper lighting is vital to improve, from an artistic point of view, the surface expanse and decorative detailing of architectural heritage buildings considered valuable. When properly lit, monumental buildings can become to onlookers an essential part of the city. Nowadays, for design planners dealing with the improvement of buildings, whose architectural design should be valorized, the real challenge is to combine the lighting artistic requirements with scrupulous economic management in order to limit the energy demand and to respect the environment. For these reasons, this case study examines the lighting of the monumental façade and the cloister of St. Peter in Chains situated in the Faculty of Engineering of Sapienza University of Rome. The present lighting installation, characterized by metal halides, compact fluorescent and halogen lamps, is compared with an alternative scenario presenting LED lamps and scenographic lighting of the monumental façade. Such comparison is based on the evaluation of the lighting levels for different visual tasks and on energy and maintenance issues; the first analysis was performed through the software DIALux Evo 4.0, whereas the second was performed using ecoCALC. This study leads to the conclusion that the lighting levels of the solution presenting LED lamps are better than those of the present solution, and they comply with current standards. Finally, the higher costs of LED lamp installations and the scenographic lighting of the monumental façade are balanced by lower maintenance costs, with a payback period of seven years.

  8. Analysis and Development of the Generic Maintenance Management Process Modeling for the Preservation of Heritage School Buildings

    Directory of Open Access Journals (Sweden)

    A Z. A. Akasah

    2009-12-01

    Full Text Available Preservation of heritage school buildings requires special maintenance management practices. A thorough understanding of the maintenance management process is essential in ensuring effective maintenance practices can be instituted. The aim of this paper was to develop a generic process model that will promote the understanding of an effective management of maintenance process for heritage school buildings. A process model for the Maintenance Management of Heritage School Buildings (MMHSB was developed using the Integration Definition for Function Modeling (IDEF0 system through an iterative process. The initial MMHSB process model was submitted to a team of management experts from the Malaysian Ministry of Arts and Heritage and the Ministry of Education Malaysia for verifications. Based on their feedbacks the initial model was refined and a proposed model was developed. From the second verification, the feed back received formed the basis for the final model. The final model elucidates the items for the input, mechanism, control and output elements that are critical in the maintenance management of heritage school buildings. The model also redefines the existing scope of responsibilities of the Headmasters’ and Senior Assistants’ in the management of maintenance. The perceived effectiveness of the model by potential users was surveyed using a selected number of administrators from potentially recognized heritage schools. The results indicated that the process model is perceived as being helpful in clarifying the maintenance management process of heritage school buildings and is useful in changing the current reactive management practices to that of a more proactive practice. In conclusion, it is believed that the MMHSB Process Model is helpful in promoting the understanding of the maintenance management process which would lead to improve preservation practices of heritage school buildings.

  9. Japanese contributions to containment structure, assembly and maintenance and reactor building for ITER

    International Nuclear Information System (INIS)

    Joint design work on Conceptual Design Activity of International Thermonuclear Experimental Reactor (ITER) with four parties, Japan, the United States, the Soviet Union and the European Community began in April 1988 and was successfully completed in December 1990. In Japan, the home team was established in wide range of collaboration between JAERI and national institute, universities and heavy industries. The Fusion Experimental Reactor (FER) Team at JAERI is assigned as a core of the Japanese home team to support the joint Team activity and mainly conducted the design and R and D in the area of containment structure, remote handling and plant system. This report mainly describes the Japanese contribution on the ITER containment structure, remote handling and reactor building design. Main areas of contributions are vacuum vessel, attaching locks, electromagnetic analysis, cryostat, port and service line layout for containment structure, in-vessel handling equipment design and analysis, blanket handling equipment design and related short term R and D for assembly and maintenance, and finally reactor building design and analysis based on the equipment and service line layout and components flow during assembly and maintenance. (author)

  10. Operation and maintenance of the SOL-DANCE building solar system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-29

    The Sol-Dance building solar heating system consists of 136 flat plate solar collectors divided evenly into two separate building systems, each providing its total output to a common thermal storage tank. An aromatic base transformer oil is circulated through a closed loop consisting of the collectors and a heat exchanger. Water from the thermal storage tank is passed through the same heat exchanger where heat from the oil is given up to the thermal storage. Back-up heat is provided by air source heat pumps. Heat is transferred from the thermal storage to the living space by liquid-to-air coils in the distribution ducts. Separate domestic hot water systems are provided for each building. The system consists of 2 flat plate collectors with a single 66 gallon storage tank with oil circulated in a closed loop through an external tube and shell heat exchanger. Some problems encountered and lessons learned during the project construction are listed as well as beneficial aspects and a project description. As-built drawings are provided as well as system photographs. An acceptance test plan is provided that checks the collection, thermal storage, and space and water heating subsystems and the total system installation. Predicted performance data are tabulated. Details are discussed regarding operation, maintenance, and repair, and manufacturers data are provided. (LEW)

  11. Plant design and layout of the different buildings with respect to safety, operational and maintenance requirements

    International Nuclear Information System (INIS)

    Design and layout of the buildings of a nuclear power plant are governed by the safety requirements regarding nearby population as called for by government regulations as well as by operational and maintenance requirements called for by the power utilities in order to assure smooth operation and easy service conditions. The lecture will focus on the different functional circumstances to be considered, their relative importance, criteria to be applied, pertinent regulations etc. and also give examples on the solutions to the above requirements. Main topics to be covered will be those circumstances that impose the highest demands on the civil engineering layout and design: airplane impact, earthquake, loss of coolant accident, pipe whipping, fuel cask transfer, annual overhaul, leak detection etc. (orig./RW)

  12. Relationship between Quality of Building Maintenance Management Services for Indoor Environmental Quality and Occupant Satisfaction: Case Study of Bus Terminal Buildings in Penang

    Directory of Open Access Journals (Sweden)

    Full Chong Choon

    2014-01-01

    Full Text Available Maintenance is often defined as the series of activities undertaken to take care of the building structure and services to ensure the intended functions and optimal performance of a building life cycle. The management department of a building is usually responsible for the enhancement of the indoor environment quality by service delivery and for boosting occupant productivity and satisfaction. Thus, a salient point of this study is to determine the current level of the building’s maintenance management service for indoor environmental quality in Penang bus terminals, along with its occupant satisfaction with regards to the services provided in the building. The assessment of the indoor environmental quality includes the evaluation of thermal comfort, lighting condition, air quality and cleanliness. Apart from that, qualitative and quantitative methodologies were applied during the process of data collection and analysis. A questionnaire survey was distributed to 500 of the targeted population for each bus terminal, including passengers and the staff. In this study, the conclusion was drawn in which the maintenance management service level of the bus terminal was directly proportional to occupant satisfaction. However, the current quality of maintenance management services in the bus terminals are still not up to the level of the occupants’ satisfaction.

  13. Auditable safety analysis for the surveillance and maintenance of the 224-B building

    International Nuclear Information System (INIS)

    The Plutonium Concentration Facility (224-B Building) is an inactive, surplus facility that operated from 1945 until 1976. This document provides the auditable safety analysis (ASA) for the post-deactivation, long-term surveillance and maintenance phase of the abovegrade structures of the 224-B Building. In this ASA, the ability of the existing facilities to withstand the effects of natural phenomena hazard events is evaluated and the support systems used to maintain ventilation and/or prevent the spread of contamination are described. The purpose of the S ampersand M phase is as follows: Maintain confinement of residual inventories of radioactive materials and other contaminants until the facility is ultimately dispositioned; Prevent deterioration of confinement structures; Respond to potential accident conditions requiring response and mitigation; Provide for the safety of workers involved in the S ampersand M phase; and Provide the basis for evaluation and selection of ultimate disposal alternatives. In this ASA, the ability of the existing facilities to withstand the effects of natural phenomena hazard (NPH) events is evaluated and the support systems used to maintain ventilation and/or prevent the spread of contamination are described. This document also evaluates S ampersand M activities that are routinely required (i.e., the S ampersand M of facility barriers, equipment, structures, and postings [including repair and upgrade]; measures to identify, remove, or repair damaged asbestos; measures to identify, remove, or appropriately manage existing containers of hazardous substances; nondestructive assay, waste characterization and sampling; and the performance of spill response measures as needed). The type and nature of the hazards presented by the 224-B Building and specific controls that are required to maintain these hazards to acceptable levels are also identified

  14. Building Maintenance Mechanic. Apprenticeship Training Standards = Mecanicien d'entretien des batiments. Normes de formation en apprentissage.

    Science.gov (United States)

    Ontario Ministry of Skills Development, Toronto.

    These training standards for building maintenance mechanics are intended to be used by apprentice/trainees, instructors, and companies in Ontario, Canada, as a blueprint for training or as a prerequisite for accreditation/certification. The training standards identify skills required for this occupation and its related training program. They are…

  15. Legionellosis prevention in building water and HVAC systems a practical guide for design, operation and maintenance to minimize the risk

    CERN Document Server

    Joppolo, Cesare Maria; Pitera, Luca Alberto; Angermann, Jean Pierre; Izard, Mark

    2013-01-01

    This Guidebook is a practical guide for design, operation and maintenance to minimize the risk of legionellosis in building water and HVAC systmes. It is devided into several themes such as: Air conditioning of the air (by water – humidification), Production of hot water for washing (fundamentally but not only hot water for washing) and Evaporative cooling tower.

  16. Managing Asbestos in Place: A Building Owner's Guide to Operations and Maintenance Programs for Asbestos-Containing Materials.

    Science.gov (United States)

    Environmental Protection Agency, Washington, DC.

    Instructions for building owners on the selection and application of appropriate asbestos control and abatement actions are presented in this guidebook. Chapter 1 offers background information on the asbestos problem. Chapter 2 describes the purpose and scope of an operations and maintenance (O&M) program. The third chapter discusses planning…

  17. Human resource development and capacity-building during China’s rapid scale-up of methadone maintenance treatment services

    OpenAIRE

    Jianhua Li; Changhe Wang; McGoogan, Jennifer M; Keming Rou; Marc Bulterys; Zunyou Wu

    2013-01-01

    PROBLEM: China's National Methadone Maintenance Treatment Programme (MMT) has expanded from eight clinics serving approximately 1000 clients to 738 clinics that have served more than 340 000 clients cumulatively in only 8 years. This has created an enormous demand for trained providers. APPROACH: Human resource development and capacity building efforts have been conducted in China's National MMT Programme to create a supply of providers trained in administering MMT for opioid dependence. LOCA...

  18. Building a maintenance policy through a multi-criterion decision-making model

    Science.gov (United States)

    Faghihinia, Elahe; Mollaverdi, Naser

    2012-08-01

    A major competitive advantage of production and service systems is establishing a proper maintenance policy. Therefore, maintenance managers should make maintenance decisions that best fit their systems. Multi-criterion decision-making methods can take into account a number of aspects associated with the competitiveness factors of a system. This paper presents a multi-criterion decision-aided maintenance model with three criteria that have more influence on decision making: reliability, maintenance cost, and maintenance downtime. The Bayesian approach has been applied to confront maintenance failure data shortage. Therefore, the model seeks to make the best compromise between these three criteria and establish replacement intervals using Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE II), integrating the Bayesian approach with regard to the preference of the decision maker to the problem. Finally, using a numerical application, the model has been illustrated, and for a visual realization and an illustrative sensitivity analysis, PROMETHEE GAIA (the visual interactive module) has been used. Use of PROMETHEE II and PROMETHEE GAIA has been made with Decision Lab software. A sensitivity analysis has been made to verify the robustness of certain parameters of the model.

  19. Building an Apprenticeship and Training System for Maintenance Occupations in the American Transit Industry

    Science.gov (United States)

    Glover, Robert W.; Clopton, Lewis; McCollum, Malcolm; Wang, Xinge

    2007-01-01

    Purpose: The purpose of this paper is to discuss the joint training and apprenticeship system emerging in maintenance occupations in the US transit industry, its challenges and strategies to overcome them. Design/methodology/approach: The paper reports on early results, including efforts to develop a consensus national framework for apprenticeship…

  20. Maintenance Budgeting.

    Science.gov (United States)

    Smith, J. McCree

    Three methods for the preparation of maintenance budgets are discussed--(1) a traditional method, inconclusive and obsolete, based on gross square footage, (2) the formula approach method based on building classification (wood-frame, masonry-wood, masonry-concrete) with maintenance cost factors for each type plus custodial service rates by type of…

  1. Surveillance and maintenance report on the Alpha-4 Building at the Oak Ridge Y-12 Plant for fiscal year 1995

    International Nuclear Information System (INIS)

    Part of the Environmental Restoration Division and funded by the Office of Environmental Management (EM-40) Program, the Oak Ridge Y-l2 Plant Decontamination and Decommissioning Program strives to protect human health and the environment and reduce the number of hazardous-material-contaminated facilities by properly managing and dispositioning facilities when they are no longer required to fulfill a site mission. Building 9201-4, known as Alpha-4, is the only facility at the Y-12 Plant under the D and D Program, and it is the D and D Program that provides surveillance and maintenance (S and M) of the facility. Alpha-4 housed uranium enrichment operations from 1945--47. In 1955 a process known as Colex, for column exchange, that involved electrochemical and solvent extraction processes began. These processes required substantial quantities of mercury as a solvent to separate lithium-6 from lithium-7 (in the form of lithium hydroxide). The Colex process was discontinued in 1962, leaving a legacy of process equipment and lines contaminated with mercury and lithium hydroxide. Now in the inactive-shutdown phase, Alpha-4 requires an S and M program that provides for risk mitigation, hazard abatement, and site preparation for subsequent D and D and/or long-term maintenance of the shutdown status of the building. Daily surveillance activities emphasizes structural integrity, leak detection, safeguards, health of personnel, environmental issues, safety conditions, equipment, hazardous materials, mercury monitoring, and cleanup. This report communicates the status of the program plans and specific surveillance and maintenance requirements for Alpha-4

  2. Knowledge management and information tools for building maintenance and facility management

    CERN Document Server

    Talamo, Cinzia

    2015-01-01

    This book describes the latest methods and tools for the management of information within facility management services and explains how it is possible to collect, organize, and use information over the life cycle of a building in order to optimize the integration of these services and improve the efficiency of processes. The coverage includes presentation and analysis of basic concepts, procedures, and international standards in the development and management of real estate inventories, building registries, and information systems for facility management. Models of strategic management are discussed and the functions and roles of the strategic management center, explained.  Detailed attention is also devoted to building information modeling (BIM) for facility management and potential interactions between information systems and BIM applications. Criteria for evaluating information system performance are identified, and guidelines of value in developing technical specifications for facility management service...

  3. Maintenance of Vinyl Asbestos and Asphalt Tile Floors in Institutional, Industrial and Commercial Buildings.

    Science.gov (United States)

    Asphalt and Vinyl Asbestos Tile Inst., New York, NY.

    The claim is made that proper planning and modest outlays of time, labor, and material costs can provide and maintain a high appearance level for floors in institutional, commercial, and industrial buildings. Instructions for four basic steps in maintaining the good looks of vinyl asbestos and asphalt tile floors are treated in the booklet--(1)…

  4. Risk management in architectural design control of uncertainty over building use and maintenance

    CERN Document Server

    Martani, Claudio

    2015-01-01

    This book analyzes the risk management process in relation to building design and operation and on this basis proposes a method and a set of tools that will improve the planning and evaluation of design solutions in order to control risks in the operation and management phase. Particular attention is paid to the relationship between design choices and the long-term performance of buildings in meeting requirements expressing user and client needs. A risk dashboard is presented as a risk measurement framework that identifies and addresses areas of uncertainty surrounding the satisfaction of particularly relevant requirements over time. This risk dashboard will assist both designers and clients. It will support designers by enabling them to improve the maintainability of project performance and will aid clients both in devising a brief that emphasizes the most relevant aspects of maintainability and in evaluating project proposals according to long-term risks. The results of assessment of the proposed method and...

  5. Methods for designing building envelope components prepared for repair and maintenance

    DEFF Research Database (Denmark)

    Rudbeck, Claus Christian

    2000-01-01

    components that were designed to be prepared for repair and maintenance. Both of these components are insulation systems for flat roofs and low slope roofs; components where repair or replacement is very expensive if the roofing material fails in its function. The principle of both roofing insulation systems...... is that the insulation can be dried, a task which is impossible in traditional flat roof insulation systems. The drying is made possible by ventilation with outside air through or below the insulation layer for a short period of time once water has been detected. The properties and performance of the...... systems have been evaluated by experiments in the laboratory and by using a proposed method. Both roofing insulation systems showed good performance in the experiments and in the performance assessment.The final section of the dissertation consists of the the conclusions of the dissertation and the...

  6. Building 9201-4 at the Oak Ridge Y-12 Site annual surveillance and maintenance report 1994

    International Nuclear Information System (INIS)

    The Oak Ridge Y-12 Plant Decontamination and Decommissioning (D ampersand D) Program is part of the Waste Management/D ampersand D Organization and is funded by the Office of Environmental Restoration (EM-40). Strategic goals are to protect human health and environment and to reduce the number of hazardous material-contaminated facilities by properly managing and dispositioning facilities when they are no longer required to fulfill a site mission. The D ampersand D Program objectives include (1) providing surveillance and maintenance (S ampersand M) activities in support of facilities in standby and awaiting D ampersand D; (2) developing specific methods, schedules, and funding plans for the D ampersand D of shutdown facilities; and (3) implementing plans to provide for facility disposition in a safe, compliant, and cost effective manner. Presently Building 9201-4 (Alpha-4) is the only facility at the complex that is in the Y-12 D ampersand D Program. This report provides a status of the program plans and specific S ampersand M requirements for Building 9201-4 as part of the Y-12 D ampersand D Program

  7. Human Capacity Building in Energy Efficiency and Renewable Energy System Maintenance for the Yurok Tribe

    Energy Technology Data Exchange (ETDEWEB)

    Engel, R. A.' Zoellick, J J.

    2007-07-31

    From July 2005 to July 2007, the Schatz Energy Research Center (SERC) assisted the Yurok Tribe in the implementation of a program designed to build the Tribe’s own capacity to improve energy efficiency and maintain and repair renewable energy systems in Tribal homes on the Yurok Reservation. Funding for this effort was provided by the U.S. Department of Energy’s Tribal Program under First Steps grant award #DE-FG36-05GO15166. The program’s centerpiece was a house-by-house needs assessment, in which Tribal staff visited and conducted energy audits at over fifty homes. The visits included assessment of household energy efficiency and condition of existing renewable energy systems. Staff also provided energy education to residents, evaluated potential sites for new household renewable energy systems, and performed minor repairs as needed on renewable energy systems.

  8. Operation and maintenance of the Sol-Dance Building solar system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Gaultney, J.R.

    1980-07-29

    A 16,400 square foot general office facility has its primary heating provided by a flat plate solar system using hydronic storage and water-to-air transfer coils for distribution. Backup heat is provided by 10 individually controlled air source heat pumps ranging from 3 tons to 5 tons in capacity. These heat pumps also contain electric resistive elements for use during extremely low ambient temperatures. Cooling is also provided by the heat pumps. Each of the two buildings contains a separate domestic hot water system. Primary heat is provided by a closed loop solar unit with electric elements providing backup heat. A 10,000 gallon black steel water tank provides heat storage.

  9. Human resource development and capacity-building during China's rapid scale-up of methadone maintenance treatment services

    Directory of Open Access Journals (Sweden)

    Jianhua Li

    2013-02-01

    Full Text Available PROBLEM: China's National Methadone Maintenance Treatment Programme (MMT has expanded from eight clinics serving approximately 1000 clients to 738 clinics that have served more than 340 000 clients cumulatively in only 8 years. This has created an enormous demand for trained providers. APPROACH: Human resource development and capacity building efforts have been conducted in China's National MMT Programme to create a supply of providers trained in administering MMT for opioid dependence. LOCAL SETTING: From 2004 to 2007, China's National MMT Programme faced several problems: inappropriately low methadone doses, poor compliance, high concurrent drug use and high drop-out rates among clients, and little experience, little training and high turnover rates among providers. RELEVANT CHANGES: Training programmes for individual providers and their trainers were redeveloped and expanded in 2008. Although programme performance metrics show an increase in patients' annual mean duration in treatment (93 days in 2004 versus 238 days in 2011, the increase in their mean daily methadone dose (from 47.2 mg in 2004 to 58.6 mg in 2011 is modest. LESSONS LEARNT: Some of the problems that can arise during the development, launch and scale-up of a major national public health effort, such as China's National MMT Programme, cannot be foreseen. Key to the programme's success so far have been the strong commitment on the part of China's government and the optimism and pragmatism of programme managers. Human resources development and capacity-building during scale-up have contributed to improved service quality in MMT treatment clinics and are critical to long-term success.

  10. Building

    OpenAIRE

    Seavy, Ryan

    2014-01-01

    Building for concrete is temporary. The building of wood and steel stands against the concrete to give form and then gives way, leaving a trace of its existence behind. Concrete is not a building material. One does not build with concrete. One builds for concrete.

  11. Standing tree assessment for the maintenance of historic wooden buildings: a case study of a World Heritage site in China

    OpenAIRE

    Yin W; Yamamoto H.

    2013-01-01

    Historic wooden buildings are a symbol of China’s “culture of wood” and require extraction of forest resources for their renovation. In the 21st century, natural resources are limited globally, and sustainable solutions are needed. In this study, we established a new method to connect building and forest sites for efficient utilization of limited forest resources for the renovation of historic buildings. We obtained measurements of large wooden components from Shenyang Imperial Palace. We als...

  12. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  13. Network maintenance

    CERN Multimedia

    GS Department

    2009-01-01

    A site-wide network maintenance operation has been scheduled for Saturday 28 February. Most of the network devices of the general purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites throughout the day. This upgrade will not affect the Computer Centre itself, Building 613, the Technical Network and the LHC experiments, dedicated networks at the pits. For further details of this intervention, please contact Netops by phone 74927 or e-mail mailto:Netops@cern.ch. IT/CS Group

  14. Network maintenance

    CERN Multimedia

    IT Department

    2009-01-01

    A site wide network maintenance has been scheduled for Saturday 28 February. Most of the network devices of the General Purpose network will be upgraded to a newer software version, in order to improve our network monitoring capabilities. This will result in a series of short (2-5 minutes) random interruptions everywhere on the CERN sites along this day. This upgrade will not affect: the Computer centre itself, building 613, the Technical Network and the LHC experiments dedicated networks at the pits. Should you need more details on this intervention, please contact Netops by phone 74927 or email mailto:Netops@cern.ch. IT/CS Group

  15. Standing tree assessment for the maintenance of historic wooden buildings: a case study of a World Heritage site in China

    Directory of Open Access Journals (Sweden)

    Yin W

    2013-05-01

    Full Text Available Historic wooden buildings are a symbol of China’s “culture of wood” and require extraction of forest resources for their renovation. In the 21st century, natural resources are limited globally, and sustainable solutions are needed. In this study, we established a new method to connect building and forest sites for efficient utilization of limited forest resources for the renovation of historic buildings. We obtained measurements of large wooden components from Shenyang Imperial Palace. We also performed morphometric analyses on 47 thinned, old-growth larch trees to determine the relative taper curve, and selected 108 standing trees for simulation of the tree-height curve in the Mt. Changbai area, Jinlin Province, Northeast China. On the basis of forest metrology, we established an upper tree prediction method. By measuring the diameter at breast height (DBH alone, we could compare size information (e.g., diameter, length for standing trees and wooden building components. This method was then applied to estimate the required DBH class of standing trees for the renovation of Shenyang Imperial Palace.

  16. Recent advances in Corporate Real Estate Management: ëEntrepreneurial Cooperationí in restructuring, maintenance and control: an answer to the ëexplosiveí technological growth in building Industry?

    OpenAIRE

    R. van Nattem; A. Proveniers

    2011-01-01

    The Credit Crunch brings to light a renewed interest in the operational tasks of Corporate Real Estate Management (CREM): a so called ëEntrepreneurial Cooperationí (ëOndernemend Samenwerken) in restructuring, maintenance and control. This so called ëEntrepreneurial Cooperationí implies a renewed approach of the internal customer and also a renewed cooperation with the building contractors for restructuring, maintenance and control. It leads to supply chain optimization and also to new roles f...

  17. Maintenance Trades Guidelines

    Science.gov (United States)

    Weidner, Theodore J.

    2008-01-01

    In 2002, APPA published "Maintenance Staffing Guidelines for Educational Facilities," the first building maintenance trades staffing guideline designed to assist educational facilities professionals with their staffing needs. addresses how facilities professionals can determine the appropriate size and mix of their organization. Contents include…

  18. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS)

  19. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  20. EUREKA project 2081 EUROENVIRON-MAINTENVIR: Building maintenance considered under ecological and economic aspects. Final report; Instandhaltungsmanagement und Oekologie - Instandhaltung von Gebaeuden (SINUS). Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Siedlarek, H.; Theis, A.

    2001-06-29

    The SINUS project intended to support building availability by regular maintenance, to reduce environmental pollution and waste production during the building life, to save natural resources, and to draw up a practical manual for this purpose. the findings were supported by tests on pilot plants and selected reference systems. [German] Primaeres Ziel des SINUS Projektes war es, die umweltgerechte Herstellung von nutzerorientierter Verfuegbarkeit von Gebaeuden durch eine nachhaltige Instandhaltung zu unterstuetzen, Umweltbelastungen waehrend der Betriebs-/Gebrauchsphase zu reduzieren, Stoffstroeme zu verringern, natuerliche Ressourcen zu schonen und die Ergebnisse in einem Handbuch des 'Integrierten Gebaeudeinstandhaltung und Umweltschutz Management Systems' abzubilden (siehe Schlussbericht Kapitel 2). Um die Praxistauglichkeit der Forschungsergebnisse zu gewaehrleisten, wurden diese staendig durch die Umsetzung an Pilotanlagen und ausgewaehlten Referenzsystemen evaluiert (siehe Schlussbericht Kapitel 5.3, 5.5). Es konnte einerseits detailliert dargelegt werden, dass sich erhebliche Synergieeffekte bei der Integration von Instandhaltung und Umweltschutz erzielen lassen (siehe Schlussbericht Kapitel 4,5). Andererseits wurde deutlich, dass Instandhaltung an sich angewandter Umweltschutz ist. Es wurden Methoden, Werkzeuge und systematische Vorgehensweisen entwickelt, die nachweislich nicht nur zu einer Verringerung des Material- und Energieverbrauches in einzelnen Phasen des Lebenszyklus fuehren, sondern vor allem zur Nachhaltigkeit der Nutzung, insbesondere zur Lebensdauerverlaengerung von Gebaeuden bzw. zur Nutzungsdauerverlaengerung einzelner Elemente des technischen Sachsystems Gebaeude, angewendet werden koennen. Ferner wurde deutlich, wie relevant die Einbindung des Know-how der operativen Ebene der Instandhaltung und des Umweltschutzes in verschiedene Lebenszyklusphasen (z.B. Design) eines Bauteiles ist, um eine umweltgerechte und nachhaltige

  1. Converter Compressor Building, SWMU 089, Hot Spot Areas 1, 2, and 5 Operations, Maintenance, and Monitoring Report, Kennedy Space Center, Florida

    Science.gov (United States)

    Wilson, Deborah M.

    2015-01-01

    This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from operation of the air sparging (AS) interim measure (IM) for Hot Spot (HS) Areas 1, 2, and 5 at the Converter Compressor Building (CCB) located at Kennedy Space Center (KSC), Florida. The objective of the IM at CCB HS Areas 1, 2, and 5 is to decrease concentrations of volatile organic compounds (VOCs) in groundwater in the treatment zones via AS to levels that will enable a transition to a monitored natural attenuation (MNA) phase. This OMMR presents system operations and maintenance (O&M) information and performance monitoring results since full-scale O&M began in June 2014 (2 months after initial system startup in April 2014), including quarterly performance monitoring events in July and October 2014 and January and May 2015. Based on the results to date, the AS system is operating as designed and is meeting the performance criteria and IM objective. The performance monitoring network is adequately constructed for assessment of IM performance at CCB HS Areas 1, 2, and 5. At the March 2014 KSC Remediation Team (KSCRT) Meeting, team consensus was reached for the design prepared for expansion of the system to treat the HS 4 area, and at the November 2014 KSCRT Meeting, team consensus was reached that HS 3 was adequately delineated horizontally and vertically and for selection of AS for the remedial approach for HS 3. At the July 2015 KSCRT meeting, team consensus was reached to continue IM operations in all zones until HSs 3 and 4 is operational, once HS 3 and 4 zones are operational discontinue operations in HS 1, 2, and 5 zones where concentrations are less than GCTLs to observe whether rebounding conditions occur. Team consensus was also reached to continue quarterly performance monitoring to determine whether operational zones achieve GCTLs and to continue annual IGWM of CCB-MW0012, CCBMW0013, and CCB-MW0056, located south of the treatment area. The

  2. Maintenance methods

    International Nuclear Information System (INIS)

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations

  3. Maintenance management

    International Nuclear Information System (INIS)

    Maintenance program of nuclear power plant (NPP) was decided by safety and economics. Safety was not always compatible with economics. Management of NPP's maintenance was to adjust and promote maintenance action taking into account of economics and safety. From securities report from 2000 to 2002 fiscal year, generation cost of NPP was calculated 8.3 Yen/kWh (capacity factor=78%) compared with 10.0 Yen/kWh (capacity factor=41%) of thermal power. Reduction or suppression of generation cost requested to reduce fuel and operation and maintenance cost or to increase power generation capacity. Increase of operating years and upgrade of capacity factor contributed to reduce generation cost and then aging measures for lifecycle extension of NPP was important as well as securing high capacity factor without failures or troubles of NPP with adequate maintenance action. Maintenance program was arranged to decide scope of inspection and repair and measures based on evaluated data. Use of risk information was recommended for reliable maintenance. Safety, quality assurance and schedule of maintenance work were supervised as well as radiation protection and occupational safety. (T. Tanaka)

  4. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  5. Maintenance concepts for ITER

    International Nuclear Information System (INIS)

    Neutron activation of structural materials will preclude human access into the ITER vacuum vessel soon after the start of the operations. As a result, all maintenance operations inside the vacuum vessel will have to be carried out remotely. Because of attenuation of neutrons by the shield blanket and vacuum vessel, the activation levels inside the cryostat will build up slowly, and restricted, short term human access for inspection and repair operations may remain feasible. Tasks of loner duration will, however, have to be undertaken remotely. Maintenance concepts for in-vessel and ex-vessel (inside cryostat) components are described in the paper. (author). 5 refs

  6. Preventive maintenance

    International Nuclear Information System (INIS)

    The information contained in this paper should be used in conjunction with the maintenance instructions provided by the manufacturer of each valve. When there is any question or conflict between the procedure described and the manufacturer's, the author suggests determining the best method for the applications. A good long range preventative maintenance program for valves will eliminate costly repairs or replacement of valves long before their time. A little flush, lube, and what was once called elbow grease will also go a long way in reducing your downtime and maintenance budget. This paper will discuss one of the most misunderstood theories concerning valve maintenance, i.e., that periodic maintenance of valves includes the injection of sealants. Sealants are injected into valves as a secondary seal for most valves. Under normal conditions, valves do not require sealant injection. Solid fillers in sealants tend to plug the system making it virtually impossible to inject either sealant or a lubricant, requiring the injection of flush or cleaners to dislodge the solids. Topics covered in this paper will range from general maintenance requirements to valve flushing, cleaning and lubrication

  7. Maintenance Therapy in IBD

    Science.gov (United States)

    ... Help Center Home > Resources > Maintenance Therapy Go Back Maintenance Therapy Email Print + Share The term "maintenance therapy" ... are referred to as "maintenance therapies." Why is Maintenance Therapy Needed in IBD? Both Crohn's disease and ...

  8. Building Footprints, Building Footprints at Maryland Transit Administration's Maintenance Facilities (Bus, Light Rail, Metro, MARC), Published in 2007, 1:12000 (1in=1000ft) scale, Maryland Transit Administration.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Building Footprints dataset, published at 1:12000 (1in=1000ft) scale, was produced all or in part from Hardcopy Maps information as of 2007. It is described as...

  9. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas, Edouard; Levrat, Eric; Iung, Benoît; Cocheteux, Pierre

    2009-01-01

    Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert can take advantage of a g...

  10. 21 CFR 211.58 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Maintenance. 211.58 Section 211.58 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL... Maintenance. Any building used in the manufacture, processing, packing, or holding of a drug product shall...

  11. Organisational challenges of maintenance work at NPPs

    International Nuclear Information System (INIS)

    The proper working of the machinery is critical to NPP safety and productivity. Because maintenance routines and plant modifications are the activities that intervene most with the machinery, they are also the dominant sources of faults. Most of the human factor studies have relied on this fact. Due to the diversity, the temporal and spatial separation of the maintenance tasks, and the numerous competence requirements, focusing on a single task, special situation or a single psychological problem can only partially explain the requirements of maintenance work and the organisational challenges of effective maintenance. We have applied a cultural approach to maintenance work. Our aim has been to model the maintenance task and its psychological requirements and to characterise the features of organisational cultures in three NPP maintenance units. Results imply similarities and differences in the cultures and in the emphasis on the maintenance task. Maintenance activities have been under various restructuring initiatives. These changes have been experienced as stressful among the personnel. The effect of changes on the reliability of maintenance should be considered. A challenge for maintenance is to be able to build organisational structures and practices that would facilitate the fulfilment of the psychological work characteristics. (orig.)

  12. Modeling and Analysis of Complex Equipment Maintenance Dynamics

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    An equipment maintenance system is naturally a complex dynamical system. The effective maintenance management must be based on the knowledge of the system's intrinsic dynamics. And the structure of the maintenance system determines its behavior. This paper analyzes the basic structures and elements of a maintenance system for complex multi-components equipment. The maintenance system is considered as a dynamic system whose behavior is influenced by its structure's feedback and interaction, and the system's available resources. Building the dynamical model with Simulink, we show some results about the maintenance system's nonlinear dynamics, which are never given by stochastic process methods. The model can be used for understanding and determining maintenance system behavior, towards which operational adjustments of maintenance infrastructure, precise prediction of maintenance requirements and timely supply of maintenance resources can be made in a more informed way.

  13. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  14. Environmental impacts during the operational phase of residential buildings

    NARCIS (Netherlands)

    Blom, I.S.

    2010-01-01

    To date, the focus in the field of sustainable building has been on new building design. However, existing residential buildings inflict great environmental burden through three causes: continuous energy consumption, regular building maintenance and replacements. This publication analyses and compa

  15. Energy management systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lush, D.M.

    1979-07-01

    An investigation is made of the range of possibilities available from three types of systems (automatic control devices, building envelope, and the occupants) in buildings. The following subjects are discussed: general (buildings, design and personnel); new buildings (envelope, designers, energy and load calculations, plant design, general design parameters); existing buildings (conservation measures, general energy management, air conditioned buildings, industrial buildings); man and motivation (general, energy management and documentation, maintenance, motivation); automatic energy management systems (thermostatic controls, optimized plant start up, air conditioned and industrial buildings, building automatic systems). (MCW)

  16. A Situational Maintenance Model

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance.......An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance....

  17. Maintenance and Condition-Based Maintenance

    Institute of Scientific and Technical Information of China (English)

    DING Jin-hua; WANG Xue-Jun; ZHOU Rong; LIN Min; Olsson Erland

    2005-01-01

    The evolution of maintenance management is briefly introduced in this paper, from corrective maintenance to preventive maintenance. First, a range of condition monitoring and fault diagnosis techniques developed in different industries are surveyed; Second, many methods of condition monitoring are presented; Third, mathematical methods used in condition monitoring are given; Then the merits and shortcomings are discussed.Efficient maintenance policies are of fundamental importance in system engineering because of their fallbacks into the safety and economics of plant operation. Applying condition-based maintenance to a system can reduce the cost and extend the availability of facilities. With the advent of personal computers as fast and cost effective machines for data acquisition and processing of multiple signals some shortcomings mentioned in condition monitoring could be solved or reduced to some extent. These PCs can be a solution as a condition monitoring based maintenance system.

  18. Evaluation of Maintenance Management Practice in Banking Industry in Lagos State, Nigeria

    Directory of Open Access Journals (Sweden)

    Olajide Julius Faremi

    2012-04-01

    Full Text Available The study focused on maintenance management practice in banking industry in Lagos state, Nigeria. It assessed the operational state of bank buildings, the factors affecting maintenance management of bank buildings, the maintenance management strategy used in maintainingbank buildings and the adequacy of funds available for maintenance management of bank buildings within the study area. In achieving these objectives, opinions of maintenanceofficers and users of randomly selected banks were sampled through structured questionnaires. The data collected were analyzed using descriptive and inferential statistics. The analysis revealed the operational state of bank buildings in Lagos State as good, there is no significant difference in the perception of the maintenance staff and users as to the operational state. However, there is significant difference in the operational state of the old and the newgeneration bank buildings as the study reveals that the components and services of the buildings of the new generation banks are in better operational state than those of the old generation bank buildings. Maintenance officers ranked attitude of users and misuse of facilities as the most significant factor affecting maintenance management of bank buildings while users of the buildings ranked lack of discernable maintenance culture in the country asthe most significant factor responsible for poor maintenance management of bank buildings. The perception of the maintenance staff and users of bank buildings as regards factors responsible for poor maintenance management of bank buildings are significantly different. The study recommended proactive measures to keep hypothesized factors under check in other to overcome the prevailing maintenance problems of bank buildings. Top managementare to provide adequate funding for the running of maintenance operations and such funds should be properly monitored to ensure that it is judiciously utilized.

  19. Predictive Maintenance (PdM) Centralization for Significant Energy Savings

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Dale

    2010-09-15

    Cost effective predictive maintenance (PdM) technologies and basic energy calculations can mine energy savings form processes or maintenance activities. Centralizing and packaging this information correctly empowers facility maintenance and reliability professionals to build financial justification and support for strategies and personnel to weather global economic downturns and competition. Attendees will learn how to: Systematically build a 'pilot project' for applying PdM and tracking systems; Break down a typical electrical bill to calculate energy savings; Use return on investment (ROI) calculations to identify the best and highest value options, strategies and tips for substantiating your energy reduction maintenance strategies.

  20. Guidance Manual: Asbestos Operations & Maintenance Work Practices. Second Edition.

    Science.gov (United States)

    National Inst. of Building Sciences, Washington, DC.

    This technical manual provides detailed guidance to building owners, asbestos program managers, and operations and maintenance (O&M) workers for managing asbestos-containing materials (ACM) in buildings. The manual addresses four different types of ACM found in buildings and three different levels of precaution which may be warranted by specific…

  1. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  2. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  3. 某砖混结构建筑受采动影响分析与加固维修方案∗%Analysis and reinforcing and maintenance scheme of a brick-concrete structure building with the influence of mining moves

    Institute of Scientific and Technical Information of China (English)

    田迎斌

    2014-01-01

    以河北省某矿工业广场内运销办公楼为例,介绍了建筑概况和工业广场压覆煤层的情况,分析了4#煤层开采对建筑的影响,预测了建筑损坏程度的发展趋势,提出了建筑的加固维修方案,确保了运销办公楼的安全正常使用。%The author took a distribution office building in a mine industrial square of Hebei Province as an example,introduced the general situation of the buildings and the coal seams un-der the industrial square,analyzed the influence on the buildings of the 4th coal seam mining, predicted the development tendency of the building damage,provided the reinforcement and ma-intenance scheme of the buildings,and also ensured the safety and normal use of this distribution office building.

  4. Maintenance Free Bearings

    OpenAIRE

    S. M. Muzakkir & Harish Hirani

    2015-01-01

    In the present research work the need of a Maintenance Free Bearings (MFB) is established. The paper presents preliminary friction calculations to highlight the ways to achieve maintenance free bearings. The existing technologies of well established maintenance free bearings are described. The hybridization of bearing technologies to achieve low cost maintenance free bearings has been exemplified. Finally a combination of passive magnetic repulsion and hydrodynamics ha...

  5. Influence of reactor maintenance considerations on the design of a commercial EBT power plant

    International Nuclear Information System (INIS)

    An analysis of the scheduled reactor maintenance requirements of an Elmo Bumpy Torus Reactor (EBTR) and their effect on the reactor and reactor-building design was performed. The requirements for scheduled maintenance are that blanket replacement be accomplished in less time than that required for annual scheduled balance-of-plant maintenance (28 days), that capital and operating costs be minimized and availability maximized. Three circular reactor-building concepts were evaluated: a reactor building with permanent space outboard of the reactor for maintenance operations; a building with permanent maintenance space above the reactor; and a mobile maintenance module concept where the module moves around the perimeter of the reactor building and provides temporary space for maintenance at the required location. This paper presents the rationale for selection. of the first option. Time estimates and equipment requirements for first-wall/blanket/shield (FWBS) replacement are presented

  6. Optimization of surface maintenance

    International Nuclear Information System (INIS)

    The present conference paper deals with methods of optimizing the surface maintenance of steel-made offshore installations. The paper aims at identifying important approaches to the problems regarding the long-range planning of an economical and cost effective maintenance program. The methods of optimization are based on the obtained experiences from the maintenance of installations on the Norwegian continental shelf. 3 figs

  7. Asphalt in Pavement Maintenance.

    Science.gov (United States)

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  8. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  9. Property Maintenance : Concepts and determinants

    OpenAIRE

    Muyingo, Henry

    2009-01-01

    Introduction Strategic property management aims at balancing the question of how the needed space is to be secured, maintained, increased or disposed of in a cost effective manner under a mixture of decisions and actions. In recent years, the interest in building maintenance has increased as more and more of the housing stock built after the Second World War is in need of major renovation.  For example, approximately 1 million dwellings were constructed in Sweden in the period 1960-1970. Curr...

  10. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  11. EPR design for maintenance

    International Nuclear Information System (INIS)

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  12. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  13. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  14. Maintenance management systems

    International Nuclear Information System (INIS)

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  15. Equipment maintenance of Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    The Rokkasho Reprocessing Plant is the first commercial reprocessing plant in Japan and has adopted the best technology from home and abroad. The Rokkasho Reprocessing Plant is composed of approximately 150,000 devices and buildings are located separately according to process. In this paper, we introduce the outline of reprocessing process and maintenance activities for the Rokkasho Reprocessing Plant. (author)

  16. Maintenance evaluation for space station liquid systems

    Science.gov (United States)

    Flugel, Charles

    1987-01-01

    Many of the thermal and environmental control life support subsystems as well as other subsystems of the space station utilize various liquids and contain components which are either expendables or are life-limited in some way. Since the space station has a 20-year minimum orbital lifetime requirement, there will also be random failures occurring within the various liquid-containing subsystems. These factors as well as the planned space station build-up sequence require that maintenance concepts be developed prior to the design phase. This applies to the equipment which needs maintenance as well as the equipment which may be required at a maintenance work station within the space station. This paper presents several maintenance concepts for liquid-containing items and a flight experiment program which would allow for evaluation and improvement of these concepts so they can be incorporated in the space station designs at the outset of its design phase.

  17. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems

  18. V-TECS Guide for Industrial Maintenance Mechanic.

    Science.gov (United States)

    Meyer, Calvin F.; Benson, Robert T.

    This guide is intended to assist vocational teachers who are teaching a course in industrial machinery maintenance and repair; electromechanical, hydraulic, and pneumatic instrument repair; or building maintenance. Addressed in the individual units of the course outline are the following topics: assembling and disassembling machine mechanisms;…

  19. From Bad to CAD: Maintaining Records of Maintenance Projects.

    Science.gov (United States)

    Shea, Diane C.

    1994-01-01

    A computer-assisted design (CAD) software program is used in a Connecticut school district to graphically provide information on maintenance projects by school and category of project over time. CAD supplies a computerized building plan, a "foot-print," used as a recordkeeping system for maintenance projects. (MLF)

  20. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.;

    2010-01-01

    The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during the...... design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document is to...... present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  1. Pump application and maintenance

    International Nuclear Information System (INIS)

    Nuclear maintenance programs are typically organized by overall application, function, cost impact, and failure histories. Each maintenance program is uniquely tailored for each plant's specific goals and objectives. Most maintenance programs include pump maintenance within an application and/or a function. NMAC provides guidance on maintenance, troubleshooting, and applications of Deep Draft Vertical Centrifugal Pumps, Main Coolant Pump Seals, Feedwater Pumps, and Charging Pumps. Each maintenance guide includes a technical discussion of the design and operating issues which influence pump and component performance, reliability, and availability. The guides also discuss comprehensive inspection and corresponding repair Advisory groups consisting of utility, manufacturer, and regulatory representatives oversee the development of the NMAC guides, and review by utility personnel further augments the development process

  2. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  3. Status of fusion maintenance

    International Nuclear Information System (INIS)

    Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission

  4. Maintenance of Photochemotherapy

    OpenAIRE

    Deniz Seçkin

    2010-01-01

    Phototherapy and photochemotherapy are widely used effective treatment modalities for many skin diseases. The data regarding the efficacy of maintenance narrowband ultraviolet B (NB-UVB) and psoralen and UVA (PUVA) therapies, the most commonly used photo(chemo) therapy methods, in the literature are limited and controversial. In this review article, the data and guidelines in the literature regarding maintenance NB-UVB and PUVA therapy in psoriasis, mycosis fungoides and vitiligo, and mainten...

  5. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  6. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  7. Remote Maintenance Monitoring System

    Data.gov (United States)

    Department of Transportation — The Remote Maintenance and Monitoring System (RMMS) is a collection of subsystems that includes telecommunication components, hardware, and software, which serve to...

  8. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  9. BIM (Building Information Modeling) and TCO (Total Cost of Ownership)

    Science.gov (United States)

    Christensen, Douglas K.

    2009-01-01

    There are some words in the building industry that seem to be clear and understandable to say, yet they need some help in understanding the depth of the meaning. When the term maintenance is talked about there seems to be some agreement that it does not mean building a new building. Maintenance as a term covers many areas and if not clarified…

  10. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  11. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  12. Mobile network maintenance (GSM)

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN mobile network infrastructure (GSM) on the 23 and 24 July from 6 p.m. to 6 a.m. in order to replace discontinued equipment and to increase the bandwidth capacity of the GSM mobile network. All CERN GSM emitters (40 units) will be moved one by one to the new infrastructure during the maintenance. The call of a user connected to an emitter at the time of its maintenance will be cut off. However, the general overlapping of the GSM radio coverage should mean that users are able immediately to call again should their call be interrupted. IT/CS/CS

  13. Mould growth on building materials

    DEFF Research Database (Denmark)

    Fog Nielsen, K.

    Mould growth in buildings is associated with adverse health effects among the occupants of the building. However actual growth only occurs in damp and water-damaged materials, and is an increasing problem in Denmark, due to less robust constructions, inadequate maintenance, and too little...... ventilation. This project was started to determine if mycotoxins are produced in damp and water-damaged buildings as well investigating the influence of environmental conditions (humidity and temperature) on the production of fungal growth and secondary metabolism....

  14. Maintenance – Wind Energy Production

    OpenAIRE

    Sankaranarayanan, Vairamayil

    2015-01-01

    This thesis investigates issues like maintenance problems, key factors, maintenance challenges, maintenance solutions and practical difficulties in wind energy. In this case, surveys and interviews have been taken from several companies and maintenance experts, to find most prevailing problems and problem-solving methods since last few years. It helps to show, how the energy maintenance has been developed in past few years. Also it analyses the impact of fourth generation maintenance in wind ...

  15. Maintenance of Photochemotherapy

    Directory of Open Access Journals (Sweden)

    Deniz Seçkin

    2010-12-01

    Full Text Available Phototherapy and photochemotherapy are widely used effective treatment modalities for many skin diseases. The data regarding the efficacy of maintenance narrowband ultraviolet B (NB-UVB and psoralen and UVA (PUVA therapies, the most commonly used photo(chemo therapy methods, in the literature are limited and controversial. In this review article, the data and guidelines in the literature regarding maintenance NB-UVB and PUVA therapy in psoriasis, mycosis fungoides and vitiligo, and maintenance photo(chemotherapy applications in Başkent University and other photo(chemo therapy centers are presented. Prospective, double-blind, randomized, controlled, long-term multicenter studies using standard treatment protocols are needed to obtain the best data about the efficacy and safety of maintenance photo(chemotherapy applications.

  16. [Medical Equipment Maintenance Methods].

    Science.gov (United States)

    Liu, Hongbin

    2015-09-01

    Due to the high technology and the complexity of medical equipment, as well as to the safety and effectiveness, it determines the high requirements of the medical equipment maintenance work. This paper introduces some basic methods of medical instrument maintenance, including fault tree analysis, node method and exclusive method which are the three important methods in the medical equipment maintenance, through using these three methods for the instruments that have circuit drawings, hardware breakdown maintenance can be done easily. And this paper introduces the processing methods of some special fault conditions, in order to reduce little detours in meeting the same problems. Learning is very important for stuff just engaged in this area. PMID:26904890

  17. Getting into Motorcycle Maintenance

    Science.gov (United States)

    Mosher, Lynn

    1978-01-01

    This article tells how to start a high school course in motorcycle maintenance and includes names and addresses of some motorcycle manufacturers and a list of needed tools, equipment, and materials. (MF)

  18. Equipment maintenance and repair

    Directory of Open Access Journals (Sweden)

    Walia DS

    2010-10-01

    Full Text Available The repair and maintenance of ophthalmic equipment, including surgical instruments and diagnostic devices, can be compared to the maintenance of a motor vehicle, something many of us understand well.If you had a car, would you drive it until the fuel runs out or until a tyre punctures, and then abandon it to buy a new car? Of course not. However, many eye care units purchase (or receive as a donation expensive and delicate equipment which, because of poor maintenance, ends up breaking down. If there is not a system in place to report breakdowns and to plan or carry out repairs, equipment can remain unusable for long periods of time. Sometimes, this equipment ends up being dumped. Good maintenance habits and an effective repair system will minimise the amount of time equipment is unusable.

  19. Experts' meeting: Maintenance '83

    International Nuclear Information System (INIS)

    The brochure presents, in full wording, 20 papers read at the experts' meeting ''Maintenance '83'' in Wiesbaden. Most of the papers discuss reliability data (acquisition, evaluation, processing) of nearly all fields of industry. (RW)

  20. Remote maintenance development

    International Nuclear Information System (INIS)

    The concept of remote maintenance as it pertains to nuclear fuel fabrication facilities is quite unique. The future may require completely remote facilities where maintenance will be performed by hybrid manipulators/robots. These units will be capable of being preprogrammed for automatic operation or manually operated with the operator becoming a part of the closed loop control system. These robots will mesh television, computer control, and direct force feedback manual control in a usable new concept of robotics

  1. Remote maintenance development

    Energy Technology Data Exchange (ETDEWEB)

    Zook, C. R.

    1979-01-01

    The concept of remote maintenance as it pertains to nuclear fuel fabrication facilities is quite unique. The future may require completely remote facilities where maintenance will be performed by hybrid manipulators/robots. These units will be capable of being preprogrammed for automatic operation or manually operated with the operator becoming a part of the closed loop control system. These robots will mesh television, computer control, and direct force feedback manual control in a usable new concept of robotics.

  2. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  3. The present condition of forest roads as a result of their past maintenance

    OpenAIRE

    Hribernik, Boštjan; Potočnik, Igor

    2006-01-01

    Forest roads are built for forest management purposes, to which planning of their use and maintenance is adapted. The increasing importance of non-forestry use of forest roads leads to higher maintenance standard, which by formed maintenance system causes permanent shortage of funds. Higher maintenance costs occur due to the past forest roads construction characteristics, which gave priority to quick opening of villages and farms, on the account of building quality. Other funds expenditure re...

  4. Sick building syndrome

    Directory of Open Access Journals (Sweden)

    Tjandra Y. Aditama

    2002-06-01

    Full Text Available Sick building syndrome describes a number of mostly unspesific complaints of some occupants of the building. The exact pathophysiological mechanism remains elusive. It is a multi factorial event which may include physical, chemical, biological as well as psycological factors. In many cases it is due to insufficient maintenance of the HVAC (heating, ventilation, air conditioning system in the building. Sign and symptoms can be uncomfortable and even disabling, which may include mucus membrane irritation, neurotoxic symptoms, asthma like symptoms, skin complaints, gastrointestinal symptoms and other related symptoms. There are various investigation methods to diagnose sick building syndrome, and on site assessment of the building is extremely useful. Prevention through a proactive air quality monitoring program is far more desirable than dealing with an actual sick building. Indoor air and the sick building symdrome serves as a paradigm of modern occupational and environmental medicine. (Med J Indones 2002; 11:124-31Keywords: indoor air pollution, sick building syndrome, building related illness

  5. Study on Operational Maintenance and Management System of Energy Saving Supervisory Platform for Public Buildings in Chongqing%重庆市公共建筑节能监管平台后期运行维护管理研究

    Institute of Scientific and Technical Information of China (English)

    赵本坤; 李克玉

    2014-01-01

    该文介绍了重庆市公共建筑节能监管平台运行管理及维护现状,并以重庆市公共建筑节能监管平台在后期运行维护中遇到的问题为例,阐述了后期运维管理对公共建筑节能监管平台持续健康发展的重要性,对公共建筑节能监管平台运维体系建设的需求、目标和建设思路进行了研究。%The current situation of the operational maintenance and management system of energy-saving supervisory platform for public buildings in Chongqing are introduced. Based on the problems in the process, the importance of final-period operational maintenance and management on the healthy sustainable development of the supervisory platform is elaborated. The demand, goal and establishment of the platform's construction are also studied.

  6. Towards a Process for Developing Maintenance Tools in Academia

    CERN Document Server

    Kienle, Holger M

    2008-01-01

    Building of tools--from simple prototypes to industrial-strength applications--is a pervasive activity in academic research. When proposing a new technique for software maintenance, effective tool support is typically required to demonstrate the feasibility and effectiveness of the approach. However, even though tool building is both pervasive and requiring significant time and effort, it is still pursued in an ad hoc manner. In this paper, we address these issues by proposing a dedicated development process for tool building that takes the unique characteristics of an academic research environment into account. We first identify process requirements based on a review of the literature and our extensive tool building experience in the domain of maintenance tools. We then outline a process framework based on work products that accommodates the requirements while providing needed flexibility for tailoring the process to account for specific tool building approaches and project constraints. The work products are...

  7. Reliability Centered Maintenance - Methodologies

    Science.gov (United States)

    Kammerer, Catherine C.

    2009-01-01

    Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

  8. Maintenance and replacement of windows; Ikkunoiden kunnossapito ja uusiminen

    Energy Technology Data Exchange (ETDEWEB)

    Kivimaeki, J.; Immonen, K. [Renova-tieto, Helsinki (Finland)

    1993-05-01

    `Maintenance and Replacement of Windows` is the final report for the study `Energy Efficient Repair of Windows` belonging to the ETRR Research Programme on Energy Efficient Buildings and Building Components. The research programme is financed by The Energy Department of The Ministry of Trade and Industry in Finland. The objective of the study was the repair and replacement techniques of windows, their effect on heat losses in residential buildings, different glazing and window types, the characteristics of windows, as well as testing these characteristics. Other objectives were the use potential of new window technology in building renovation, repair costs, and the life-cycle costs of window repairs. The report gives advice on maintenance inspection of windows, choosing the right repair techniques, as well as signing and supervising window repair contracts. The information is based on practical experience achieved from building sites. The report is intended for experts, designers, house owners, and other people involved with window repairs and maintenance. Reducing the heat losses of windows is sensible even with current energy prices. Reducing the energy losses through windows is one the best energy saving measures, both for individual buildings and the whole building stock. When repairing windows, too little attention is often paid to energy efficiency, because the maximum U value permissible for windows according to the National Building Code of Finland is rather high compared with the U values for walls, which are 0.2 - 0.3 W/m{sup 2}K.

  9. Maintenance and replacement of windows. Ikkunoiden kunnossapito ja uusiminen

    Energy Technology Data Exchange (ETDEWEB)

    Kivimaeki, J.; Immonen, K. (Renova-tieto, Helsinki (Finland))

    1993-01-01

    'Maintenance and Replacement of Windows' is the final report for the study 'Energy Efficient Repair of Windows' belonging to the ETRR Research Programme on Energy Efficient Buildings and Building Components. The research programme is financed by The Energy Department of The Ministry of Trade and Industry in Finland. The objective of the study was the repair and replacement techniques of windows, their effect on heat losses in residential buildings, different glazing and window types, the characteristics of windows, as well as testing these characteristics. Other objectives were the use potential of new window technology in building renovation, repair costs, and the life-cycle costs of window repairs. The report gives advice on maintenance inspection of windows, choosing the right repair techniques, as well as signing and supervising window repair contracts. The information is based on practical experience achieved from building sites. The report is intended for experts, designers, house owners, and other people involved with window repairs and maintenance. Reducing the heat losses of windows is sensible even with current energy prices. Reducing the energy losses through windows is one the best energy saving measures, both for individual buildings and the whole building stock. When repairing windows, too little attention is often paid to energy efficiency, because the maximum U value permissible for windows according to the National Building Code of Finland is rather high compared with the U values for walls, which are 0.2 - 0.3 W/m[sup 2]K.

  10. PROACTIVE STRATEGY MAINTENANCE

    Directory of Open Access Journals (Sweden)

    Stanisław RADKOWSKI

    2014-03-01

    Full Text Available Given challenging competition of today service providers are required to be more proactive in satisfying the environmental conditions and customer needs. Proactive maintenance should start at the design stage with establishing the functions, functional failures and failure modes. The understanding the failure behavior, especially the relationship between potential failures, functional failures and diagnostic parameters is the most important task. In the next step the designer have to explore the maintenance activities as they have to apply to the design criteria. The models and frameworks have been presented in the paper also a comprehensive review of literature and some results of laboratory investigations.

  11. An Improved Logic Diagram of RCM with the Proactive Maintenance

    Institute of Scientific and Technical Information of China (English)

    SONG Wenyuan; KANG Jianshe; WEN Liang; HONG Qing

    2006-01-01

    For some repeatedly occurring failure with root cause, the reliability centered maintenance (RCM) can't deal with them effectively. So, the logic diagram of RCM was improved by combining it with proactive maintenance technology. First, root cause analysis is used to build a key result-cause chain of the repeatedly occur failure. Then, a reasonable link in the chain, which work station is suitable to be monitored and repaired, should be selected. Finally, the corresponding proactive maintenance measure should be adopted to prevent the matter occur on the chain and broken the key result-cause chain, and the repeatedly occur failure is to be prevent at a deeper level or from the root cause. By doing this, a system engineering method comes into being, not only it can determine the needs of preventive maintenance for equipment, but also determine the proactive maintenance needs for equipment. The analysis result of reliability centered maintenance and the analysis result considering proactive maintenance are combined to form a maintenance guideline containing proactive maintenance strategy.

  12. Lifetime environmental impact of buildings

    CERN Document Server

    Mequignon, Marc

    2014-01-01

    This work discusses the impact of the life of buildings on? sustainable development methods.?The study of the lifespan of the building is used to assess and?manage the environmental impacts associated?with all the stages of a product's life, from raw material extraction?through to repair, maintenance and?? 'end of life' scenarios. While several papers have discussed thegreenhouse gas emissions of buildings,?less research has been done on how these are affected by the lifespan?of the building. This book serves to?highlight the pertinence of this factor and contributes to providing?new ideas on

  13. Maintenance Implementation Plan for the Fast Flux Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    Crawford, C.N.; Duffield, M.F.

    1992-06-01

    The maintenance program for the 400 Area, Fast Flux Test Facility (FFTF)Plant and plant support facilities includes the reactor plant, reactor support systems and equipment, Maintenance and Storage Facility, plant buildings, and building support systems. These are the areas of the facility that are covered by this plan. The personnel support facilities and buildings are maintained and supported by another department within Westinghouse Hanford, and are not included here. The FFTF maintenance program conducts the corrective and preventive maintenance necessary to ensure the operational reliability and safety of the reactor plant and support equipment. This comprehensive maintenance program also provides for maximizing the useful life of plant equipment and systems to realize the most efficient possible use of resources. The long-term future of the FFTF is uncertain; in the near term, the facility is being placed in standby. As the plant transitions from operating status to standby, the scope of the maintenance program will change from one of reactor operational reliability and life extension to preservation.

  14. Optimization potential in maintenance

    International Nuclear Information System (INIS)

    Also in the future, the supreme goal of nuclear power plant operation is going to be plant safety. At the same time, the economic component must be taken into account, which has become more important as a consequence of the deregulation in the electricity market. Until now, the electricity generating costs in nuclear power plants have been optimized by increases in electricity generation, and by high plant availabilities in terms of time and capacity. However, these capacity-based influences on the generating costs practically have been exploited to the full extent possible because of the high plant reliability reached. This makes the cost term the focal point in all optimization efforts, i.e. in existing nuclear power plants especially the maintenance costs. At the present high level of safety, which is going to develop even further, growing operating experience will allow a change to be made from preventive maintenance to cost-optimized state-oriented maintenance strategies. Other measures of advanced maintenance strategies are seen in the fields of work organization, personnel management, and personnel and plant use planning for more than one site. Important components in this effort are IT-based plant management systems allowing the complex problems to be planned, executed, controlled, and analyzed. All these measures serve to allow the operation of nuclear power plants at an even higher level of optimization, maximum safety in line with the state of the art, and demonstrably competitive electricity generating costs. (orig.)

  15. Grounds Maintenance Evaluation.

    Science.gov (United States)

    Chesapeake Public Schools, VA. Office of Program Evaluation.

    The Grounds Shop of the Chesapeake Public School Division (Virginia) Department of School Plants was evaluated in 1995-96. The goals of the grounds maintenance program are to provide safe and attractive grounds for students, parents, and staff of the school district. The evaluation examined the extent to which these goals are being met by using…

  16. Operations and maintenance philosophy

    International Nuclear Information System (INIS)

    This Operations and Maintenance (O and M) Philosophy document is intended to establish a future O and M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O and M lessons learned into on-going and future project upgrades

  17. Maintenance: problem and solution

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    Equipment that is often unique, machines that are as old as the Laboratory, continuous and demanding performance requirements: these are the challenges faced by CERN’s accelerator maintenance teams. There are some twenty such teams, attached to different departments. A new project aims to standardise their procedures to make their work easier, and you can be a part of it.   “For the past year or so, the Accelerator and Technologies Sector and the GS Department have been working together on identifying the needs of the different teams that perform maintenance on CERN’s equipment. We are now ready to provide computer support with detailed specifics about the processes that need to be set up,” explains Goran Perinić, one of the leaders in CERN’s new Maintenance Management project (MMP). Since the LHC entered operation, the responsibilities of the technical teams have been broadened to cover maintenance of the collider and that of its injectors...

  18. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  19. Maintenance in sustainable manufacturing

    Directory of Open Access Journals (Sweden)

    Vladimir Stuchly

    2014-09-01

    Full Text Available Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will be needed in the future. This new approach forces manufacturing companies to change their previous management paradigms. New management paradigm should include new issues and develop innovative methods, practices and technologies striving for solving problem of shortages of resources, softening environment overload and enabling development of environment-friendly lifecycle of products. Hence, its realization requires updating existing production models as they are based on previously accepted paradigm of unlimited resources and unlimited regeneration capabilities. Maintenance plays a crucial role because of its impact on availability, reliability, quality and life cycle cost, thus it should be one of the main pillars of new business running model.  Material and methods: The following paper is a result of research on the literature and observation of practices undertaken by a company within maintenance area. Results and conclusions: The main message is that considering sustainable manufacturing requires considerable expanding range of analysis and focusing on supporting processes. Maintenance offers numerous opportunities of decreasing influence of business processes on natural environment and more efficient resources utilization. The goal of maintenance processes realizing sustainable development strategy is increased profitability of exploitation and optimization of total lifecycle cost without disturbing safety and environmental issues. 

  20. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Liping; Hong, Tianzhen

    2013-01-01

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct

  1. Approach to Brand Building and Maintenance for Yangcheng Lake Hairy Crabs under Market Environment%市场环境下的大闸蟹品牌创立与维护探讨

    Institute of Scientific and Technical Information of China (English)

    王超; 杨德利

    2011-01-01

    Under the good situation of economy growth, people's consuming level and consuming sense is constantly progressing. There appear more and more varieties of Yangcheng Lake Hiry Crabs in aquatic product market and more brands appear here and there. In the competition the crabs enjoy different popularity and show variable quality. The market of the Yangchenh Lake Hairy Crab becomes complicated and lots common non-brand crabs try to pass themselves off as the qualified ones. To build a top brand for the Yangcheng Lake Hairy Crab and do something to maintain the brand would make long term benefit for Yangcheng Lake Hairy Crabs enterprises, for the consuming people and for the whole aquatic product industry as well. To build and maintain Yangcheng Lake Hairy Crabs brand will be an expected tread for future Yangcheng Lake Hairy Crab market, it is also necessary for the growth of Yangcheng Lake Hairy Crab enterprises, and it is an deal way to make responsible for the consumers.%随着国内经济发展的良好态势,人们消费水平的不断提商以及消费意识的不断转变,水产品市场上的大闸蟹品种也越来越丰富,大闸蟹品牌更是日益繁多.然而,在错综复杂的品牌大战中,各个大闸蟹品牌的知名度却大大不同,其质量也参差不齐,大闸蟹市场开始变得错综复杂,产生了许多普通蟹、非品牌蟹仿冒知名品牌大闸蟹的情况.建立一个知名度高的大闸蟹品牌且对其进行适当的有效维护,将会对大闸蟹生产企业、大闸蟹消费人群及整个水产品行业带来三者共赢的长远利益.创立与维护大闸蟹品牌是今后大闸蟹市场的预期走势,也是大闸蟹企业想要做好做大的必要步骤,更是对消费者负责的良好途径.

  2. Optimization of reliability centered predictive maintenance scheme for inertial navigation system

    International Nuclear Information System (INIS)

    The goal of this study is to propose a reliability centered predictive maintenance scheme for a complex structure Inertial Navigation System (INS) with several redundant components. GO Methodology is applied to build the INS reliability analysis model—GO chart. Components Remaining Useful Life (RUL) and system reliability are updated dynamically based on the combination of components lifetime distribution function, stress samples, and the system GO chart. Considering the redundant design in INS, maintenance time is based not only on components RUL, but also (and mainly) on the timing of when system reliability fails to meet the set threshold. The definition of components maintenance priority balances three factors: components importance to system, risk degree, and detection difficulty. Maintenance Priority Number (MPN) is introduced, which may provide quantitative maintenance priority results for all components. A maintenance unit time cost model is built based on components MPN, components RUL predictive model and maintenance intervals for the optimization of maintenance scope. The proposed scheme can be applied to serve as the reference for INS maintenance. Finally, three numerical examples prove the proposed predictive maintenance scheme is feasible and effective. - Highlights: • A dynamic PdM with a rolling horizon is proposed for INS with redundant components. • GO Methodology is applied to build the system reliability analysis model. • A concept of MPN is proposed to quantify the maintenance sequence of components. • An optimization model is built to select the optimal group of maintenance components. • The optimization goal is minimizing the cost of maintaining system reliability

  3. Pilot project: maintenance indicators

    International Nuclear Information System (INIS)

    The aim was to contribute to the development of maintenance indicators based on computer-based reports of faults and on the on-line operation data which are currently measured. The feedwater system, including pumps and heat exchangers, in the reactor cooling system at the Barsebaeck reactors in Malmo, Sweden, was chosen as the focal point of the investigation. Available data on fault registration and on operation were examined in detail. The conclusion was that there was a satisfactory amount of relevant information at Barsebaeck to enable an evaluation of the reactor system's physical condition at any given point in time, and that this could be utilized for optimization of maintenance planning. (AB)

  4. Selection of maintenance tasks

    International Nuclear Information System (INIS)

    Two methodologies for maintenance task selection, Reliability Centre Maintenance (RCM) and Degradation Mode Analysis (DMA), are compared with regard to application in the nuclear industry and potential for application at CANDU nuclear power plants. RCM is the favoured one of the two methodologies. It is more thorough than DMA, is well supported within the US nuclear industry, and - with experience in application - is gaining cost effectiveness. There is interest in the use of RCM in other nations, including France and Japan, and it is already being implemented at Bruce A NGS and Bruce B NGS in Canada. DMA lags behind RCM in development and currently there is little experience to support claims of major benefits at reduced cost. Significant advantages over RCM need to be demonstrated if DMA is to gain acceptance in the nuclear industry. (author). 41 refs., 7 tabs., 8 figs

  5. Terminal automation system maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Coffelt, D.; Hewitt, J. [Engineered Systems Inc., Tempe, AZ (United States)

    1997-01-01

    Nothing has improved petroleum product loading in recent years more than terminal automation systems. The presence of terminal automation systems (TAS) at loading racks has increased operational efficiency and safety and enhanced their accounting and management capabilities. However, like all finite systems, they occasionally malfunction or fail. Proper servicing and maintenance can minimize this. And in the unlikely event a TAS breakdown does occur, prompt and effective troubleshooting can reduce its impact on terminal productivity. To accommodate around-the-clock loading at racks, increasingly unattended by terminal personnel, TAS maintenance, servicing and troubleshooting has become increasingly demanding. It has also become increasingly important. After 15 years of trial and error at petroleum and petrochemical storage and transfer terminals, a number of successful troubleshooting programs have been developed. These include 24-hour {open_quotes}help hotlines,{close_quotes} internal (terminal company) and external (supplier) support staff, and {open_quotes}layered{close_quotes} support. These programs are described.

  6. Risk informed maintenance activity

    International Nuclear Information System (INIS)

    In recent years, risk informed activities are being investigated as scientifically rational measures. Some Risk informed activities using Core Damage Frequency (CDF) have been already employed. Examples are extraction of accident management strategies, risk informed maintenance importance and such. This paper describes risk information such as CDF, risk profile, risk importance of equipments' contribution to risk, gained from Probabilistic Analysis (PSA). Furthermore, risk informed activities conducted and/or considered are also introduced. The examples are investigation of accident management strategies, on-line maintenance and risk informed In Service Inspection (ISI). In the end, open issues for further employment of risk information in the NPP activities are summarized. Technical quality of PSA methodology is one of these issues and it should be continuously addressed, however, the risk information as it is still useful for better activities in NPP. (author)

  7. Component maintenance system

    International Nuclear Information System (INIS)

    A component maintenance system having a network linked to a data acquisition system, a data analysis system, a historical file of component design and inspection information, and a diagnostic system having the capability to perform structural analysis of discontinuities identified by the data acquisition system. The network nodes may be located apart from each other, for example in the maintenance of a nuclear power plant steam generator, the data acquisition system may be located in a high radiation area while the data analysis system is safely located away from the radiation areas. Furthermore, the diagnostic system and the file of component design and inspection history information may be centrally located and sheared to support component evaluations being conducted in numerous geographic locations. Network communication facilitates the rapid evaluation of discontinuities, thereby permitting the inspection plan to be modified as the inspection results are obtained. (author) figs

  8. Data management in maintenance outsourcing

    International Nuclear Information System (INIS)

    Most businesses view maintenance as tasks carried out by technicians and the data collected is mostly cost related. There is a growing trend towards outsourcing of maintenance and the data collection issues are not addressed properly in most maintenance service contracts. Effective maintenance management requires proper data management - data collection and analysis for decision-making. This requires a proper framework and when maintenance is outsourced it raises several issues and challenges. The paper develops a framework for data management when maintenance is outsourced and looks at a real case study that highlights the need for proper data management. - Highlights: • Framework for data management in maintenance outsourcing. • Black-box to grey-box approaches for modelling. • Improvements to maintenance decision-making. • Case study to illustrate the approaches and the shortcomings in data collection

  9. Maintenance, a global approach

    International Nuclear Information System (INIS)

    Maintenance is an important economic activity, it can represent up to 40% of operating costs in some fabrication units. The opening of energy markets to competition has led main operators to center their activities on their basis business and to sub-contract subsidiary activities. Subcontracting with strong engagements from the sub-contractor about results, time allowed and costs is now currently applied in nuclear industry. (A.C.)

  10. Maintenance in sustainable manufacturing

    OpenAIRE

    Vladimir Stuchly; Małgorzata Jasiulewicz-Kaczmarek

    2014-01-01

    Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will...

  11. Case Base Maintenance Approach.

    OpenAIRE

    Haouchine, Mohamed-Karim; Chebel-Morello, Brigitte; Zerhouni, Noureddine

    2007-01-01

    Case base Maintenance is an active Case Based Reasoning research area. The main stream focuses on the method for reducing the size of the case-base while maintaining case-base competence. This paper gives an overview of these works, and proposes a case deletion strategy based on competence criteria using a novel approach. The proposed method, even if inspired from existing literature, combines an algorithm with a Competence Metric (CM). A series of tests are conducted using two standards data...

  12. Proactive machine maintenance system

    OpenAIRE

    Kasalová, Aneta

    2016-01-01

    This bachelor thesis concerns issues of proactive maintenance, which is focused on machine tools. The most common failures and the most widespread methods of diagnostics of machine tools are described in the thesis. There are also described the procedure of Failure mode, effects and criticality analysis FMEA/FMECA, its possible development in the future with demonstrative presentation of application this analysis on CNC automatic lathe. Subsequently, in the practical part there has been chose...

  13. Maintenance in dental implants

    OpenAIRE

    Giselle Póvoa Gomes; Ronaldo Mendes Assis Lucena; Patrícia Barcelos Bastos; José Bernardes das Neves

    2008-01-01

    In implants, maintenance is a decisive factor for obtaining success when implant supported overdentures and dentures are used. The present stud presents, a clinical case of a patient, a 70 year-old white man, with a completely edentulous mandibular alveolar ridge, severe bone resorption with presence of basal bone only, and absence of vestibule. Initially, treatment consisted of the placement of a mandibular overdenture, supported on three implants in the anterior inter-foramen region, as the...

  14. Flight Crew Health Maintenance

    Science.gov (United States)

    Gullett, C. C.

    1970-01-01

    The health maintenance program for commercial flight crew personnel includes diet, weight control, and exercise to prevent heart disease development and disability grounding. The very high correlation between hypertension and overweight in cardiovascular diseases significantly influences the prognosis for a coronary prone individual and results in a high rejection rate of active military pilots applying for civilian jobs. In addition to physical fitness the major items stressed in pilot selection are: emotional maturity, glucose tolerance, and family health history.

  15. PROACTIVE STRATEGY MAINTENANCE

    OpenAIRE

    Stanisław RADKOWSKI; Robert GUMIŃSKI

    2014-01-01

    Given challenging competition of today service providers are required to be more proactive in satisfying the environmental conditions and customer needs. Proactive maintenance should start at the design stage with establishing the functions, functional failures and failure modes. The understanding the failure behavior, especially the relationship between potential failures, functional failures and diagnostic parameters is the most important task. In the next step the designer have to explore ...

  16. Reducing maintenance costs

    International Nuclear Information System (INIS)

    The increasingly more expensive maintenance measures, cuts in the cost budget, and the loss of know-how on the part of vendors all require a change of policy with respect to maintenance concepts of the part of operators. This also applies to the existing valve concepts, the drives included. Under these aspects, the current drive, which is self-actuated and actuated by outside media, for a parallel-plate valve of a nomial width of 700 was reconsidered. The effort served to reduce maintenance costs and, at the same time, simplify the drive concept as well as cut back on the number of in-service inspections. Moreover, the number of active components were to be minimized and installation conditions in the plant were to be improved. When the boundary conditions to be observed with respect to process technology had been laid down, the competent technical department developed a concept of modification of the drive. A major constituent part was the demonstration of the functioning capability of the new drive under accident conditions. It was achieved mainly by an analytical approach. In the resultant drive concept, the same control valves are employed to actuate a driving cylinder by means of self-actuation or by an outside medium as a function of pressure. (orig.)

  17. Substitution of the old console with a fully computerized one. Major maintenance and enhancements of the ventilation and air conditioning system of the reactor building. Research activities at the TRIGA L.E.N.A. plant in Pavia, Italy

    International Nuclear Information System (INIS)

    The TRIGA Mark II reactor of the University of Pavia was operated in the last two years on a routine basis accomplishing different purposes: - Development of B.N.C.T. for diffused tumours of liver; - Neutron activation analysis in matrix of geochemistry, archaeology and environment interest; - Electron spin resonance (ESR) study of radical processes; - Study of trace elements impact in environmental matrix and human health; - High purity control on electronic samples-microchips; - Fast neutron radiation damage investigation; - Certification of standard reference materials and data quality assurance by neutron activation analysis; - Age evaluation by Ar-K method in geological matrix; - Trace elements determination for provenience studies in archaeology; - Basic experiments on fission of Am-242 layers for the space nuclear engine project; - In field search of explosive using prompt gamma emission induced by neutron capture on nitrates. In the period of time between July 1998 and June 2000 the reactor was operated at full power (i.e. 250 kW) for a total amount of 1375 hours. The total fuel element burn-up was 15.07 MWD. During this period of time two major upgrading activities were planned: the installation of a new Instrumentation and Control System (ICS) for the reactor and the installation of a new Air Conditioning and Filtering System (ACFS) for the reactor building. The new ICS is a microprocessor-based design, incorporating the use of one logarithmic wide range neutron flux monitoring channel (NLW-1000), two current mode neutron monitoring safety channels (NP-1000 and NPP-1000) and a linear multi-range neutron flux monitoring channel (Keithley 485). The ICS configuration was personalized by General Atomic according to the requirements and to the technical prescriptions of the Pavia reactor, especially for what concerns the SCRAM inputs and the detectors architecture. Besides, since one the two safety channels, the NPP-1000, has been developed as an advanced

  18. Augmented reality application utility for aviation maintenance work instruction

    Science.gov (United States)

    Pourcho, John Bryan

    modern digital hardware to educate, point out gaps in research, and observe possible foundations on which to build the future of aviation maintenance job task cards leading to a the methodology of the proposed study.

  19. Motorway maintenance work

    CERN Multimedia

    2005-01-01

    Built 20 years ago, the airport section of the Geneva motorway bypass is now in need of maintenance work and alterations to bring it into line with the new standards. Two-lane traffic will be maintained in both directions during the work, which will be carried out in 2006 and 2007, but there will be various temporary special traffic arrangements in force. We should like to thank you in advance for your understanding. Civil Engineering Department, DAEL, State of Geneva More information: tel. 163 or www.autoroute-aeroport.ch Fewer cars, fewer traffic jams, with www.covoiturage.ch

  20. Use of PSA to optimize maintenance

    International Nuclear Information System (INIS)

    The presentation overviews the following issues: What is Maintenance? Definitions. The Maintenance Schedule. Short term and long term planning. What is Optimizing? Reliability Centered Maintenance. Risk-based Maintenance Optimization. Information Requirements

  1. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    OpenAIRE

    Yu-Cheng Lin; Yu-Chih Su

    2013-01-01

    Facility maintenance management (FMM) has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM) uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper prop...

  2. Towards automated traceability maintenance.

    Science.gov (United States)

    Mäder, Patrick; Gotel, Orlena

    2012-10-01

    Traceability relations support stakeholders in understanding the dependencies between artifacts created during the development of a software system and thus enable many development-related tasks. To ensure that the anticipated benefits of these tasks can be realized, it is necessary to have an up-to-date set of traceability relations between the established artifacts. This goal requires the creation of traceability relations during the initial development process. Furthermore, the goal also requires the maintenance of traceability relations over time as the software system evolves in order to prevent their decay. In this paper, an approach is discussed that supports the (semi-) automated update of traceability relations between requirements, analysis and design models of software systems expressed in the UML. This is made possible by analyzing change events that have been captured while working within a third-party UML modeling tool. Within the captured flow of events, development activities comprised of several events are recognized. These are matched with predefined rules that direct the update of impacted traceability relations. The overall approach is supported by a prototype tool and empirical results on the effectiveness of tool-supported traceability maintenance are provided. PMID:23471308

  3. ITER assembly and maintenance

    International Nuclear Information System (INIS)

    This document is intended to describe the work conducted by the ITER Assembly and Maintenance (A and M) Design Unit and the supporting home teams during the ITER Conceptual Design Activities, carried out from 1988 through 1990. Its content consists of two main sections, i.e., Chapter III, which describes the identified tasks to be performed by the A and M system and a general description of the required equipment; and Chapter IV, which provides a more detailed description of the equipment proposed to perform the assigned tasks. A two-stage R and D program is now planned, i.e., (1) a prototype equipment functional tests using full scale mock-ups and (2) a full scale integration demonstration test facility with real components (vacuum vessel with ports, blanket modules, divertor modules, armor tiles, etc.). Crucial in-vessel and ex-vessel operations and the associated remote handling equipment, including handling of divertor plates and blanket modules will be demonstrated in the first phase, whereby the database needed to proceed with the engineering phase will be acquired. The second phase will demonstrate the ability of the overall system to execute the required maintenance procedures and evaluate the performance of the prototype equipment

  4. Maintenance and management system

    International Nuclear Information System (INIS)

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  5. Remote maintenance monitoring system

    Science.gov (United States)

    Simpkins, Lorenz G. (Inventor); Owens, Richard C. (Inventor); Rochette, Donn A. (Inventor)

    1992-01-01

    A remote maintenance monitoring system retrofits to a given hardware device with a sensor implant which gathers and captures failure data from the hardware device, without interfering with its operation. Failure data is continuously obtained from predetermined critical points within the hardware device, and is analyzed with a diagnostic expert system, which isolates failure origin to a particular component within the hardware device. For example, monitoring of a computer-based device may include monitoring of parity error data therefrom, as well as monitoring power supply fluctuations therein, so that parity error and power supply anomaly data may be used to trace the failure origin to a particular plane or power supply within the computer-based device. A plurality of sensor implants may be rerofit to corresponding plural devices comprising a distributed large-scale system. Transparent interface of the sensors to the devices precludes operative interference with the distributed network. Retrofit capability of the sensors permits monitoring of even older devices having no built-in testing technology. Continuous real time monitoring of a distributed network of such devices, coupled with diagnostic expert system analysis thereof, permits capture and analysis of even intermittent failures, thereby facilitating maintenance of the monitored large-scale system.

  6. Handbook of energy use for building construction

    Energy Technology Data Exchange (ETDEWEB)

    Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  7. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  8. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  9. HUMAN FACTOR IMPACT IN MILITARY AIRCRAFT MAINTENANCE

    OpenAIRE

    MARINKOVIC SRBOLJUB J.; DRENOVAC ALEKSANDAR Z.

    2015-01-01

    Aircraft maintenance, as a specific field of military materiel maintenance, is characterized by high reliability standards, based on regulations and technical standards. A system approach to maintenance represents the key element of maintenance quality, while aircraft maintenance staff has a crucial influence on the final outcome of aircraft maintenance.

  10. Longview District Operations and Maintenance Headquarters: Environmental assessment

    International Nuclear Information System (INIS)

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives

  11. Fuzzy Logic Reliability Centered Maintenance

    Directory of Open Access Journals (Sweden)

    Felecia .

    2014-01-01

    Full Text Available Reliability Centered Maintenence (RCM is a systematic maintenence strategy based on system reliability. Application of RCM process will not always come out with a binary output of “yes” and “no”. Most of the time they are not supported with available detail information to calculate system reliability. The fuzzy logic method attempts to eliminate the uncertainty by providing “truth” in different degrees.Data and responses from maintenance department will be processed using the two methods (reliability centered maintenance and fuzzy logic to design maintenance strategy for the company. The results of the fuzzy logic RCM application are maintenance strategy which fit with current and future condition.

  12. Towards more Manageable Coastal Building; Initial Coastal Building Construction Guidelines

    Directory of Open Access Journals (Sweden)

    Roslan Talib

    2011-01-01

    Full Text Available Problem statement: As we may not be aware that the coastal construction is different from inland construction. Building in a coastal environment is different from building in an inland area. In general, buildings in coastal areas must be designed and built to withstand higher loads due to its more extreme conditions. Nowadays, the issue of global warming, uncertainty of global weather and the climate change effect indirectly creating the coastal area with much more expose to extreme condition. Formulate initial guidelines with certain degree of details how coastal construction requirements are different from those for inland construction. Approach: Due to the exposure to higher loads and extreme conditions, these structures in coastal areas will cost more to design, construct, maintain, repair and insure. Proper and right usage of building materials including electrical and mechanical equipments, are crucial in order to minimize damage. Nowadays, the issue of global warming, uncertainty of global weather and the climate change effect indirectly creating the coastal area with much more expose to extreme condition. Feedback has been gathered from the government local engineers who are doing the management of the Government’s local buildings located along the coastal area of Peninsular Malaysia. Data findings through research method, discussion with the suppliers and discussion with coastal buildings maintenance crews also has been done. Results: The research finding discus the specific characteristics that makes for successful coastal buildings focusing in tropical region. Conclusion: We must accept on the idea of building in coastal areas will require more maintenance and upkeep. By having proper coastal building guideline may create more positive awareness in constructing better management coastal buildings and can save time and money to maintain the said structures.

  13. INL Green Building Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Jennifer Dalton

    2005-05-01

    Green buildings, also known as sustainable buildings, resource efficient buildings, and high performance buildings, are structures that minimize the impact on the environment by using less energy and water, reducing solid waste and pollutants, and limiting the depletion of natural resources. As Idaho National Laboratory (INL) becomes the nation’s premier nuclear energy research laboratory, the physical infrastructure will be established to help accomplish the mission. This infrastructure, particularly the buildings, should incorporate green design features in order to be environmentally responsible and reflect an image of progressiveness and innovation to the public and prospective employees. With this in mind, the recommendations described in this strategy are intended to form the INL foundation for green building standards. The recommendations in this strategy are broken down into three levels: Baseline Minimum, Leadership in Energy and Environmental Design (LEED)Certification, and Innovative. Baseline Minimum features should be included in all new occupied buildings no matter what the purpose or size. These features do not require significant research, design, or capital costs and yet they can reduce Operation and Maintenance (O&M) costs and produce more environmentally friendly buildings. LEED Certification features are more aggressive than the Baseline Minimums in that they require documentation, studies, and/or additional funding. Combined with the Baseline Minimums, many of the features in this level will need to be implemented to achieve the goal of LEED certification. LEED Silver certification should be the minimum goal for all new buildings (including office buildings, laboratories, cafeterias, and visitor centers) greater than 25,000 square feet or a total cost of $10 million. Innovative features can also contribute to LEED certification, but are less mainstream than those listed in the previous two levels. These features are identified as areas where

  14. 327 Building hazard baseline document

    International Nuclear Information System (INIS)

    This document identifies the hazards in the 327 Building at the time that a facility walk through was performed during FY99, presents a PHA of stabilization and deactivation activities, and provides a basis for the hazard evaluation and accident analysis that will be developed in the 327 Building Basis for Interim Operation (BIO). Activities addressed in this hazard baseline document include: (1) Stabilization and deactivation activities in preparation for eventual decommissioning of the 327 Building and the routine handling, processing, and shipment of waste to support these activities. (2) 324/327 Building Minimum Safe Project engineering and maintenance activities to maintain the building and systems viable--especially the Safety SSCs--to allow stabilization, deactivation, and waste handling activities with a minimum of risk to workers, the public, and the environment

  15. Management aspects of software maintenance

    OpenAIRE

    Henderson, Brian J.; Sullivan, Brenda J.

    1984-01-01

    Approved for public release; distribution is unlimited The Federal government depends upon software systems to fulfill its missions. These software systems must be maintained and improved to continue to meet the growing demands placed on them. The process of software maintenance and improvement may be called "software evolution". The software manager must be educated in the complex nature cf soft- ware maintenance to be able to properly evaluate and manage the software maintenance effort. ...

  16. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  17. Fuzzy Logic Reliability Centered Maintenance

    OpenAIRE

    , Felecia

    2014-01-01

    Reliability Centered Maintenence (RCM) is a systematic maintenence strategy based on system reliability. Application of RCM process will not always come out with a binary output of “yes” and “no”. Most of the time they are not supported with available detail information to calculate system reliability. The fuzzy logic method attempts to eliminate the uncertainty by providing “truth” in different degrees.Data and responses from maintenance department will be processed using the two methods (re...

  18. Entretian Model for Software Maintenance

    Directory of Open Access Journals (Sweden)

    Priya K Betala

    2013-10-01

    Full Text Available Maintenance refers to the act of modifying the software after putting in use in order to maintain its usability.[1]. In other words, Software maintenance can be defined as; it is the process of providing services to the customers after the delivery of the software. Despite the fact that maintaining software is very challenging, it is the most important routine that must be carried out in the development cycle. If the software is not maintained efficiently it may lead to the death of the software. Maintenance of software may be carried out in two ways. The first one is called „In-house maintenance‟ and the second one is called „Transition maintenance‟. The latter faces the drastic challenges when compared to former, as one team may not provide complete source code to the other, leading to unstructured code, lack of appropriate technique and knowledge about the functioning of the current software. There are a few aspects of software maintenance that set it apart from the other phases. Software maintenance cost comprises more than half of the total software development cost. Also, without software maintenance, it is impossible to change the problems within the product after its release, and many disasters can happen because of immature software. Recognising the importance of software maintenance, this paper proposes a model called “ENTRETIAN MODEL” (Entretian, a French word meaning Maintenance which consists of six basic steps to follow while maintaining software system. This model overcomes certain misconceptions about maintenance phase and it is highly beneficial to the Maintenance Support Team (MST to handle their maintenance activities systematically and efficiently. By employing the proposed model, the MST is able to overcome the technical and managerial issues that are faced earlier in the maintenance phase. The advantage of using “Entretian Model” is best illustrated in this paper with the help of the ERP package.

  19. Improving industrial maintenance contract relationships

    OpenAIRE

    Jong, A. de

    2010-01-01

    Unavailability of technical systems, such as aircraft, is expensive. Technical systems require maintenance to prevent and to remedy defects that cause unavailability. Users of technical systems usually bear the consequences of the risk of unavailability, in particular the loss of productivity. This is based on the presumption that users are best able to insure the risks, although maintenance organisations may be more capable to mitigate the risks. The risks are seldom allocated to maintenance...

  20. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  1. Subcontracting Railway Maintenance

    DEFF Research Database (Denmark)

    Thommesen, Jacob

    2010-01-01

    In several European countries, national railway operators have been dismantled and partly privatized to create new contractual relations where operations originally performed internally are now outsourced to several companies. Breaking up work across several independent organizational and...... railway infrastructure manager (InfraMan), whichis subcontracting maintenance tasks to other companies. InfraMan has implemented various central elements in managing their subcontractors. The latter are required to present a safety plan as part of their bid, they must be approved if they are to be awarded...... a contract, and the competencies of their employees working on the railway are controlled and provided by InfraMan. However, this regime faces a number of further challenges, including uncertainties related to the safety plans, contested responsibility for the education program, difficulties in...

  2. Cofrentes maintenance. Life essence

    International Nuclear Information System (INIS)

    Even though it may seem like something much more complex, maintenance is not more than the seed of continuity, the alchemy of eternal youth or the key to combating the cruel passage of time that haunts us all. Little does it matter where you are from or where you are going; it is irrelevant whether you are man, woman or machine. If you do not have a more or less sensible strategy of survival, reality can take you by surprise, without prior warning, at the wrong place and the wrong time. It is sad to see how what we thought was eternal, and thus do not care for and pamper as we should, eventually loses its qualities and functions over the years and fades away like a vague memory. (Author)

  3. DCSP hardware maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Pazmino, M.

    1995-11-01

    This paper discusses the necessary changes to be implemented on the hardware side of the DCSP database. DCSP is currently tracking hardware maintenance costs in six separate databases. The goal is to develop a system that combines all data and works off a single database. Some of the tasks that will be discussed in this paper include adding the capability for report generation, creating a help package and preparing a users guide, testing the executable file, and populating the new database with data taken from the old database. A brief description of the basic process used in developing the system will also be discussed. Conclusions about the future of the database and the delivery of the final product are then addressed, based on research and the desired use of the system.

  4. Reactor building

    International Nuclear Information System (INIS)

    The whole reactor building is accommodated in a shaft and is sealed level with the earth's surface by a building ceiling, which provides protection against penetration due to external effects. The building ceiling is supported on walls of the reactor building, which line the shaft and transfer the vertical components of forces to the foundations. The thickness of the walls is designed to withstand horizontal pressure waves in the floor. The building ceiling has an opening above the reactor, which must be closed by cover plates. Operating equipment for the reactor can be situated above the building ceiling. (orig./HP)

  5. Optimal stopping for predictive maintenance

    CERN Document Server

    de Saporta, Benoîte; Zhang, Huilong; Elegbede, Charles

    2011-01-01

    We present a numerical method to compute the optimal maintenance time for a complex dynamic system. An early intervention may be uselessly costly, but a late one may lead to a partial/complete failure of the system, which has to be avoided. One must therefore find a balance between these two extreme maintenance policies. To achieve this aim, we model the system by a stochastic hybrid process and propose a numerical method to optimize the maintenance time for this kind of processes. Mathematically, this is an optimal stopping problem. We apply our algorithm to the example of maintenance of a metallic structure subject to corrosion.

  6. TCMS operations and maintenance philosophy

    Science.gov (United States)

    Buehler, David P.; Griffin, Rock E.

    1992-01-01

    The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.

  7. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  8. IMIS: Integrated Maintenance Information System. A maintenance information delivery concept

    Science.gov (United States)

    Vonholle, Joseph C.

    1987-01-01

    The Integrated Maintenance Information System (IMIS) will optimize the use of available manpower, enhance technical performance, improve training, and reduce the support equipment and documentation needed for deployment. It will serve as the technician's single, integrated source of all the technical information required to perform modern aircraft maintenance.

  9. INVESTIGATION OF THE MAINTENANCE ORGANISATION FOR HOT ROLLING MILLS

    Directory of Open Access Journals (Sweden)

    P.K. Pretorius

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Production systems have undergone dramatic changes in recent years. Many companies have implemented new technologies such as flexible manufacturing systems. There is therefore a shift in focus to maintenance and the effective management thereof. Maintenance is a dynamic activity and is comprised of a large number of interacting variables. An effective maintenance organisation is required to control these variables .
    This paper discusses the building of a maintenance organisation and the aspects that should be considered during the design. The way in which five companies that operate hot rolling mills apptoached the problem of building an effective maintenance organisation was investigated.

    AFRIKAANSE OPSOMMING: y eryaardigingstelsels het drastiese veranderinge ondergaan die afgelope aantal jaar. Verskeie Il1~atskappyemaak nou gebruik van nuwe tegnologiee, soas byvoorbeeld aanpasbare vervaardigingstelsels. Daar is gevolglik 'n verskuiwing in fokus na instandhouding en die effektiewe bestuur daarvan. lnstandhouding is 'n dinamiese aktiwiteit en behels 'n groot aantal ' gekoppelde veranderlikes. 'n Effektiewe instandhoudingsorganisasie word benodig om hierdie v'eranderlikes te beheer.
    Hierdie artikel bespreek die daarstelling van die instandhoudingsorganisasie en die parameters V~toorweeg moet word tydens die ontwerp. Die wyse waarop vyf maatskappye wat }V~rIl1walse bedryf die ontwikkeling van 'neffektiewe organisasie vir instandhouding benader hc(is ondersoek .

  10. Building America

    Energy Technology Data Exchange (ETDEWEB)

    Brad Oberg

    2010-12-31

    IBACOS researched the constructability and viability issues of using high performance windows as one component of a larger approach to building houses that achieve the Building America 70% energy savings target.

  11. Solar building

    OpenAIRE

    Zhang, Luxin

    2014-01-01

    In my thesis I describe the utilization of solar energy and solar energy with building integration. In introduction it is also mentioned how the solar building works, trying to make more people understand and accept the solar building. The thesis introduces different types of solar heat collectors. I compared the difference two operation modes of solar water heating system and created examples of solar water system selection. I also introduced other solar building applications. It is conv...

  12. Building 2000

    International Nuclear Information System (INIS)

    This is the first volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this first rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In a second volume, a similar series of studies is presented for the building categories: office buildings, public buildings and hotels and holiday complexes. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (15 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  13. Modern building reuse : documentation, maintenance, recovery and renewal

    OpenAIRE

    Riso, Vincenzo

    2014-01-01

    Index “Foreword” by Vincenzo Riso / The definition of the Field “Two or three things I know about conservation of modern architecture” by Benedetto di Cristina / “Some considerations on the preservation of 20th century architectural heritage” by Teresa Ferreira / “The Architectural Press photographs at the core of the modern architecture paradigms, UK 1950/1970” by Paulo Catrica / “Intervening in modern architecture: a design theme and a research problema” [EN e PT] by ...

  14. Lifetime oriented maintenance planning in the Netherlands

    OpenAIRE

    Straub, A

    2003-01-01

    In this paper we set up a framework for lifetime oriented maintenance planning as an outcome and input for strategic housing stock management. The maintenance planning holds maintenance activities and costs in the longer term. We consider the maintenance planning as a tool to calculate and implement maintenance strategies. Therefore we designed a model to derive maintenance strategies from housing complex strategies. Maintenance strategies depend on the desired or expected lifetime of buildin...

  15. Achieving world class maintenance status

    Energy Technology Data Exchange (ETDEWEB)

    Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

    2007-08-15

    The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

  16. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Myburgh, Corrie; Brandborg-Olsen, Dorthe; Albert, Hanne;

    2013-01-01

    To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics.......To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics....

  17. Retooling for an aging America: building the healthcare workforce. A white paper regarding implementation of recommendation 4.2 of this Institute of Medicine Report of April 14, 2008, that "All licensure, certification and maintenance of certification for healthcare professionals should include demonstration of competence in care of older adults as a criterion.".

    Science.gov (United States)

    2011-08-01

    In Chicago, Illinois, on May 7, 2009, a group of 53 medical educators representing many U.S. certification boards, residency review committees, and medical societies met to review and approve a white paper intended to promote Recommendation 4.2 of the Institute of Medicine report of April 14, 2008, "Retooling for an Aging America: Building the Healthcare Workforce." This recommendation is one of 14 and states: "All licensure, certification and maintenance of certification for healthcare professionals should include demonstration of competence in care of older adults as a criterion." Background information given included the growing numbers of older adults, review of a 15-year initiative by a section of the American Geriatrics Society (AGS) to include geriatric education in all surgical and some related medical specialties, a recent announcement of 26 elder care competencies to be expected of graduating medical students from association of American Medical Colleges (AAMC) affiliated schools, and the American Board of Medical Specialties (ABMS) approach to 'Reinforcing Geriatric Competencies through Licensure and Certification Examinations." Nine points involved in the implementation of this recommendation received discussion, and approaches to realization were presented. In conclusion, this white paper, which those listed as being in attendance approved, proposes hat all ABMS member boards whose diplomates participate in the care of older adults select the floor competencies enumerated by the AAMC that apply to their specialty and add or subtract those completed during their trainees' initial (intern) year and then define those needed in subsequent years of residency and ultimate practice. This would fulfill the requirements of Recommendation 4.2 above. PMID:21797833

  18. Space Telescope maintenance and refurbishment

    Science.gov (United States)

    Trucks, H. F.

    1983-01-01

    The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

  19. Cell Maintenance Systems

    Science.gov (United States)

    Morrison, D. R.

    1985-01-01

    Living human cells require attachment to a suitable surface and special culture conditions in order to grow. These requirements are modified and amplified when cells are taken into a weightless environment. Special handling and maintenance systems are required for routine laboratory procedures conducted in the Orbiter and in the Spacelab. Methods were developed to maintain cells in special incubators designed for the Orbiter middeck, however, electrophoresis and other experiments require cells to be harvested off of the culture substrate before they can be processed or used. The cell transport assembly (CTA) was flown on STS-8, and results show that improvements are required to maintain adequate numbers of cells in this device longer than 48 hours. The life sciences middeck centrifuge probably can be used, but modifications will be required to transfer cells from the CTA and keep the cells sterile. Automated systems such as the Skylab SO-15 flight hardware and crew operated systems are being evaluated for use on the Space Shuttle, Spacelab, and Space Station research modules.

  20. Service and Maintenance - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Soederberg, David; Weisbach, Henrik (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-11-15

    This report aims to provide information of, and experiences from, service and maintenance of Lillgrund Offshore Wind Farm. The report deals with operation and maintenance (O and M) during construction, commissioning and the first three months of operation. Focus has been to describe the organization and cooperation between Vattenfall and Siemens. Experiences have been collected by interviews with representatives from Siemens and Vattenfall. The O and M strategy defined by Lillgrund's service and maintenance contract are based on a gradual take over of O and M. Siemens will be responsible for maintenance of Lillgrund during the first five years. During this five-year period, Vattenfall will build up its own maintenance organization for Lillgrund. The first three years, Vattenfall's technicians are supposed to form 30 % of the total number of maintenance technicians. The fourth and fifth year, the corresponding amount should be 50 %. During daytime, Lillgrund is operated locally. During nights and weekends, it is operated remotely by Vattenfall's operating centre in Esbjerg. The major O and M experience from Lillgrund is the need for good administrative and technical information systems. These systems should be implemented as soon as possible because of the large amounts of documentation that are created during the commissioning phase. The technical information systems must be able to present historic data of measurements in order to see trends and analyse faults

  1. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    This Safety Guide provides detailed guidance on the provisions of the Code on the Safety in Nuclear Power Plants: Operation, IAEA Safety Series No. 50-C-O(Rev.1) on the maintenance of structures, systems and components. Like the Code, the Guide forms part of the IAEA's programme, referred to as the NUSS programme, for establishing Codes and Safety Guides relating to nuclear power plants. Effective maintenance is essential for safe operation of a nuclear power plant. It not only ensures that the level of reliability and effectiveness of all plant structures, systems and components having a bearing on safety remains in accordance with design assumptions and intent, but also that the safety status of the plant is not adversely affected after commencement of operation. Nuclear power plant maintenance requires special attention because of: Limitations set by requirements that a minimum number of components remain operable even when the plant is shut down in order to ensure that all necessary safety functions are guaranteed; Difficulty of access to some plant items even when the plant is shut down, due to radiation protection constraints; Potential radiological hazards to site personnel and the public. This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, selecting and training maintenance personnel, providing maintenance facilities and equipment, procuring stores and spare parts, reviewing, controlling and carrying out plant modifications, and generating, collecting and retaining maintenance records for establishing and

  2. Research on Selection of Equipment Maintenance Modes

    Institute of Scientific and Technical Information of China (English)

    SHANG Wen-li; SHI Hai-bo; HE Bai-tao

    2006-01-01

    The development of equipment maintenance management is introduced, and equipment maintenance concept is defined. Equipment maintenance modes are classified, analyzed and compared, which merits and demerits are pointed out. At last, a decision-making frame to select equipment maintenance modes is advanced, and steps to select and implement equipment maintenance are given.

  3. Building 2000

    International Nuclear Information System (INIS)

    This is the second volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this second rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In the first volume, a similar series of studies is presented for the building categories: schools, laboratories and universities, and sports and educational centres. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (11 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  4. Analysis of aircraft maintenance models

    Directory of Open Access Journals (Sweden)

    Vlada S. Sokolović

    2011-10-01

    Full Text Available This paper addressed several organizational models of aircraft maintenance. All models presented so far have been in use in Air Forces, so that the advantages and disadvantages of different models are known. First it shows the current model of aircraft maintenance as well as its basic characteristics. Then the paper discusses two organizational models of aircraft maintenance with their advantages and disadvantages. The advantages and disadvantages of different models are analyzed based on the criteria of operational capabilities of military units. In addition to operational capabilities, the paper presents some other criteria which should be taken into account in the evaluation and selection of an optimal model of aircraft maintenance. Performing a qualitative analysis of some models may not be sufficient for evaluating the optimum choice for models of maintenance referring to the selected set of criteria from the scope of operational capabilities. In order to choose the optimum model, it is necessary to conduct a detailed economic and technical analysis of individual tactical model maintenance. A high-quality aircraft maintenance organization requires the highest state and army authorities to be involved. It is necessary to set clear objectives for all the elements of modern air force technical support programs based on the given evaluation criteria.

  5. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  6. [Maintenance therapy for colorectal cancer].

    Science.gov (United States)

    Yamaguchi, Shigeo; Kato, Shunsuke

    2014-08-01

    Some trials have demonstrated the benefits of maintenance chemotherapy for advanced colorectal cancer. In chemotherapeutic strategies for advanced colorectal cancer, chemotherapy-related toxicity prevention and quality of life(QOL)maintenance are more important than the introduction of a strong regimen, especially when additional surgery is not possible. In Japan, the combination of a folinic acid/5-fluorouracil/oxaliplatin(FOLFOX)regimen and bevacizumab is a popular first-line chemotherapy regimen. However, despite its effectiveness, neuropathy or hand-foot syndrome after 5 or 6 cycles tends to lead to chemotherapy withdrawal. CAIRO3 trial reported the effectiveness of capecitabine and bevacizumab as a maintenance chemotherapy regimen. Additionally, the ML18147 trial demonstrated that bevacizumab beyond progression(BBP)prolonged overall survival(OS)and progression free survival(PFS)in patients with advanced colorectal cancer. Although those trials demonstrated the effectiveness of continuous or maintenance bevacizumab administration, no trials have compared the effectiveness of cytotoxic drugs with bevacizumab as maintenance therapies. Moreover, controversy exists regarding the selection of drugs as a maintenance therapy and the identification of patients who would benefit from maintenance therapy. PMID:25132024

  7. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  8. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large scale test stands, to demonstrate the feasibility in principle of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  9. Laboratory Building.

    Energy Technology Data Exchange (ETDEWEB)

    Herrera, Joshua M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-01

    This report is an analysis of the means of egress and life safety requirements for the laboratory building. The building is located at Sandia National Laboratories (SNL) in Albuquerque, NM. The report includes a prescriptive-based analysis as well as a performance-based analysis. Following the analysis are appendices which contain maps of the laboratory building used throughout the analysis. The top of all the maps is assumed to be north.

  10. Overview of maintenance principles and regulatory supervision of maintenance activities at nuclear power plants in Slovakia

    International Nuclear Information System (INIS)

    The maintenance represents one of the most important tools to ensure safe and reliable operation of nuclear power plants. The emphasis of Nuclear Regulatory Authority of the Slovak Republic to the maintenance issue is expressed by requirements in the regulations. The current practice of maintenance management in operated nuclear power plants in Slovak Republic is presented. Main aspects of maintenance, as maintenance programme, organization of maintenance, responsibilities for maintenance are described. Activities of nuclear regulatory authority in maintenance process are presented too. (author)

  11. Development of plant maintenance management system (pmms): a case study

    International Nuclear Information System (INIS)

    In large plant industry, it is not easy to maintain machine performance without using any method such as checklist system. Manual checklist is a common maintenance checklist used in industry. All machine, equipment and parts that need to be checked will be written down for the employee to do maintenance checks. Converting the manual checklist to the Plant Maintenance Management System (PMMS) can improve the way of employees work and make plant management easier. Therefore, a new system was designed to maintain the equipment so that the activities are more efficient and cost effective. The system consists of three frames that connect to each other. The frames divide to section, equipment and checklist. This system also builds to prevent data from arbitrarily changes. Only certain officers or staffs are permitted to make modifications to data. Using this system, a company can make the office environment a paperless environment

  12. Maintenance management of railway infrastructures based on reliability analysis

    International Nuclear Information System (INIS)

    Railway infrastructure maintenance plays a crucial role for rail transport. It aims at guaranteeing safety of operations and availability of railway tracks and related equipment for traffic regulation. Moreover, it is one major cost for rail transport operations. Thus, the increased competition in traffic market is asking for maintenance improvement, aiming at the reduction of maintenance expenditures while keeping the safety of operations. This issue is addressed by the methodology presented in the paper. The first step of the methodology consists of a family-based approach for the equipment reliability analysis; its purpose is the identification of families of railway items which can be given the same reliability targets. The second step builds the reliability model of the railway system for identifying the most critical items, given a required service level for the transportation system. The two methods have been implemented and tested in practical case studies, in the context of Rete Ferroviaria Italiana, the Italian public limited company for railway transportation.

  13. On Problems of Multicomponent System Maintenance Modelling

    Institute of Scientific and Technical Information of China (English)

    Tomasz Nowakowski; Sylwia Werbinka

    2009-01-01

    We present an overview of some recent developments in the area of mathematical modeling of maintenance decisions for multi-unit systems. The emphasis is on three main groups of multicomponent maintenance optimization models: the block replacement models, group maintenance models, and opportunistic maintenance models. Moreover, an example of a two-unit system maintenance process is provided in order to compare various maintenance policies.

  14. Risk Based Maintenance for Compressor Systems

    OpenAIRE

    Marquesin De Oliveira, Nathalie

    2015-01-01

    This thesis reviewed part of the maintenance activities in a compressor system using the risk based maintenance philosophy. The goal was to verify if a contribution could be made to the maintenance plan of the system. The risk based maintenance philosophy is applied according to the recommendations in NORSOK Z-008. A reliability model is proposed to verify the impact of the new maintenance approach and to make better informed decisions in the maintenance management process. The model used...

  15. Avionics Maintenance Technology Program Standards.

    Science.gov (United States)

    Georgia Univ., Athens. Dept. of Vocational Education.

    This publication contains statewide standards for the avionics maintenance technology program in Georgia. The standards are divided into the following categories: foundations, diploma/degree (philosophy, purpose, goals, program objectives, availability, evaluation); admissions, diploma/degree (admission requirements, provisional admission…

  16. Maintenance training - who needs it?

    International Nuclear Information System (INIS)

    The author's job responsibilities at Rocky Flats include preventive maintenance, training to meet the needs of maintenance personnel, training for special projects such as welding and metal fabrication, and reporting to the manager of plant maintenance engineers. He notes that many old-line manufacturers are becoming high-tech companies, emphasizing the role of automation in production and quality control. He lists and discusses changes at Rocky Flats, along with the attendant preventive maintenance program the changes necessitate. He observes estimates that training costs to companies over the next 10 years will exceed 10% of their revenues - that in 1986, American companies spent $210 billion on training at all levels. But, if you think training is expensive, try placing a cost on ignorance. 9 figures

  17. Smart schedules streamline distribution maintenance

    OpenAIRE

    CREEMERS, Tom; Ros, LLuís; Riera, Jordi; Roca, Josep; Ferrarons, Carles

    1998-01-01

    The scheduling and coordination of maintenance tasks and resource dispatching, with the aim of guaranteeing service to all customers, forms an essential part of the planning engineer's tasks. Least cost solutions are key. This article features a novel application called PLANETS, based on a constraint-logic programming paradigm, for scheduling maintenance activities on large distribution networks. Examples are included from system tests performed on subsets of the distribution network of Empre...

  18. Intelligent Building Envelopes: Architectural Concept & Applications for Daylighting Quality

    OpenAIRE

    Wyckmans, Annemie

    2005-01-01

    During the past few decades, the term intelligent building envelope has emerged as a building skin designed to meet increasingly varying and complex demands related to user comfort and energy and cost efficiency. The concept is described by a multitude of definitions that range from the use of innovative components and a high-tech visual expression to the rational design, use and maintenance of the building envelope.Within the scope of this Ph.D., intelligent behaviour for a building envelope...

  19. Maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    Maintenance action of nuclear power plant (NPP) was described. Maintenance of NPP aimed at assurance of required function of NPP's equipment so as to prevent release of radioactive materials into the environment as well as attainment of stable operation of NPP. Philosophy of NPP safety was based on defense-in-depth or multiple barriers requiring specified function for the equipment. Preventive maintenance was essential to NPP's equipment and the scope of maintenance was decided on priority with adequate method and frequency of inspection. Most inspection was conducted during periodic inspection at outage. Repair or improvement works were performed if needed. Periodic inspection period was very long and then capacity factor of NPP was low in Japan compared with foreign data although frequency of unscheduled shutdown was very low. Introduction of reability- centered maintenance was requested based on past experiences of overhaul inspection. Technical evaluation of aged NPP had been conducted on aging phenomena and promotion of advanced maintenance was more needed. (T. Tanaka)

  20. Modern Methods for the Maintenance and Rehabilitation of Sewage System

    OpenAIRE

    Brglez Noč, Urška

    2007-01-01

    The present degree thesis deals with modern methods for the maintenance and rehabilitation of sewage system, in particular with reference to public sewage networks. In the first section of the thesis the sewage system is presented as a set of buildings used for the collection and drainage of waste waters and atmospheric waters from a defined area. The design of a functionally optimal system requires adequate planning that takes into consideration all factors that affect the qua...

  1. Deactivation of Building 7602

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) has sponsored research and development programs in Building 7602 at Oak Ridge National Laboratory (ORNL) since 1984. This work focused on development of advanced technology for processing nuclear fuels. Building 7602 was used for engineering-scale tests using depleted and natural uranium to simulate the nuclear fuel. In April 1994 the DOE Office of Nuclear Energy (NE) sent supplemental FY 1994 guidance to ORNL stating that in FY 1995 and beyond, Building 7602 is considered surplus to NE programs and missions and shall be shut down (deactivated) and maintained in a radiologically and industrially safe condition with minimal surveillance and maintenance (S ampersand M). DOE-NE subsequently provided FY 1995 funding to support the deactivation activities. Deactivation of Building 7602 was initiated on October 1, 1994. The principal activity during the first quarter of FY 1995 was removal of process materials (chemicals and uranium) from the systems. The process systems were operated to achieve chemical solution concentrations needed for reuse or disposal of the solutions prior to removal of the materials from the systems. During this phase of deactivation the process materials processed and removed were: (1) Uranyl nitrate solution 30,178 L containing 4490 kg of uranium; (2) Nitric acid (neutralized) 9850 L containing less than 0.013 kg of uranium; (3) Organic solution 3346 L containing 265 kg of uranium; (4) Uranium oxide powder 95 kg; and (5) Miscellaneous chemicals. At the end of December 1994, the process systems and control systems were shut down and deactivated. Disposition of the process materials removed from the process systems in Building 7602 proved to be the most difficult part of the deactivation. An operational stand down and funding reductions at Y-12 prevented planned conversion of the uranyl nitrate solution to depleted uranium oxide powder. This led to disposal of the uranyl nitrate solution as waste

  2. Dynamic grouping maintenance with time limited opportunities

    International Nuclear Information System (INIS)

    This paper presents firstly a dynamic grouping maintenance strategy for multi-component systems with positive economic dependence, which implies that combining maintenance activities is cheaper than performing maintenance on components separately. Preventive maintenance durations and multiple occurrences of maintenance activities within scheduling horizon are considered. Moreover, in a dynamic context, maintenance opportunities, defined as inactivity periods of the systems at which several maintenance activities could be executed with reduced maintenance costs, may randomly occur with time. The second objective of the paper is to propose a new algorithm to optimally update online the grouped maintenance planning by taking into account the maintenance opportunities. A numerical example of a five components system is finally introduced to illustrate the proposed dynamic grouping maintenance strategy

  3. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2013-01-01

    Full Text Available Facility maintenance management (FMM has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.

  4. Developing mobile- and BIM-based integrated visual facility maintenance management system.

    Science.gov (United States)

    Lin, Yu-Cheng; Su, Yu-Chih

    2013-01-01

    Facility maintenance management (FMM) has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM) uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM) system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool. PMID:24227995

  5. The Application of Factor Analysis to Determine the Parameters of Planning Work-Zone in the Road Repair and Maintenance

    OpenAIRE

    Mohammad Mehdi Khabiri

    2016-01-01

    Building and maintaining transport infrastructure is essential for economic and social development of each country. The high costs of repair and maintenance of the existing road networks required to manage the road repair and maintenance and systematic planning for this process. The scope of where the operational performance of road repair and maintenance are carried is called work zone. The measures are carried in the work zone caused traffic and increased the likelihood of traffic accidents...

  6. Activity of the Service for maintenance of mechanical structures of the RA reactor - Report for 1980, Annex II

    International Nuclear Information System (INIS)

    Service for mechanical components at the RA reactor includes: control and maintenance of utility components, mechanical workshop, hot cells and storage. Control and maintenance of main components covers: reactor core, heavy water system, technical water system, gas system. This service is responsible for the following auxiliary systems: transportation units; spent fuel storage pool; special ventilation system; personal protection appliances; hot cells. Maintenance of the reactor building, ventilation, heating, water supply, sewage, fire protection devices, gas and compressed air systems are included

  7. Shuttle Repair Tools Automate Vehicle Maintenance

    Science.gov (United States)

    2013-01-01

    Successfully building, flying, and maintaining the space shuttles was an immensely complex job that required a high level of detailed, precise engineering. After each shuttle landed, it entered a maintenance, repair, and overhaul (MRO) phase. Each system was thoroughly checked and tested, and worn or damaged parts replaced, before the shuttle was rolled out for its next mission. During the MRO period, workers needed to record exactly what needed replacing and why, as well as follow precise guidelines and procedures in making their repairs. That meant traceability, and with it lots of paperwork. In 2007, the number of reports generated during electrical system repairs was getting out of hand-placing among the top three systems in terms of paperwork volume. Repair specialists at Kennedy Space Center were unhappy spending so much time at a desk and so little time actually working on the shuttle. "Engineers weren't spending their time doing technical work," says Joseph Schuh, an electrical engineer at Kennedy. "Instead, they were busy with repetitive, time-consuming processes that, while important in their own right, provided a low return on time invested." The strain of such inefficiency was bad enough that slow electrical repairs jeopardized rollout on several occasions. Knowing there had to be a way to streamline operations, Kennedy asked Martin Belson, a project manager with 30 years experience as an aerospace contractor, to co-lead a team in developing software that would reduce the effort required to document shuttle repairs. The result was System Maintenance Automated Repair Tasks (SMART) software. SMART is a tool for aggregating and applying information on every aspect of repairs, from procedures and instructions to a vehicle s troubleshooting history. Drawing on that data, SMART largely automates the processes of generating repair instructions and post-repair paperwork. In the case of the space shuttle, this meant that SMART had 30 years worth of operations

  8. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    ‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which......, which gives the book a challenging contribution to the existing body of knowledge....

  9. Maintenance proficiency evaluation test bank

    International Nuclear Information System (INIS)

    The Maintenance Proficiency Evaluation Test Bank (MPETB) is an Electric Power Research Institute- (EPRJ-) operated, utility-sponsored means of developing, maintaining, and disseminating secure, high-quality written and performance maintenance proficiency tests. EPRTs charter is to ensure that all tests and test items that go into the Test Bank have been validated, screened for reliability, and evaluated to high standards of psychometric excellence. Proficiency tests of maintenance personnel.(mechanics, electricians, and instrumentation and control [I and C] technicians) are most often used to determine if an experienced employee is capable of performing maintenance tasks without further training. Such tests provide objective evidence for decisions to exempt an employee from what, for the employee, is unnecessary training. This leads to considerable savings in training costs and increased productivity because supervisors can assign personnel to tasks at which their competence is proven. The ultimate objective of proficiency evaluation is to ensure that qualified maintenance personnel are available to meet the maintenance requirements of the plant Numerous task-specific MPE tests (both written and performance) have been developed and validated using the EPRI MPE methodology by the utilities participating in the MPETB project A task-specific MPE consists of a multiple-choice written examination and a multi-step performance evaluation that can be used to assess an individual's present knowledge and skill level for a given maintenance task. The MPETB contains MPEs and test items for the mechanical, electrical, and I and C classifications that are readily available to participating utilities. Presently, utilities are placing emphasis on developing MPEs to evaluate outage-related maintenance tasks that demonstrate the competency and qualifications of plant and contractor personnel before the start of outage work. Utilities are also using the MPE methodology and process to

  10. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TNTM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  11. Experience based reliability centered maintenance

    International Nuclear Information System (INIS)

    The systematic analysis and documentation of operating experiences should be included in a living NPP life management program. Failure mode and effects and maintenance effects analyses are suitable methods for analysis of the failure and corrective maintenance experiences of equipment. Combined use of the information on occurred functional failures and the decision tree logic of the reliability centered maintenance identifies applicable and effective preventive maintenance tasks of equipment in an old plant. In this study the electrical motor drives of closing and isolation valves (MOV) of TVO and Loviisa nuclear power plants were selected to serve as pilot study objects. The study was limited to valve drives having actuators manufactured by AUMA in Germany. The fault and maintenance history of MOVs from 1981 up to and including October 1991 in different safety and process systems at TVO 1 and 2 nuclear power units was at first analyzed in a systematic way. The scope of the components studied was 81 MOVs in safety-related systems and 127 other MOVs per each TVO unit. In the case of the Loviisa plant, the observation period was limited to three years, i.e. from February 1989 up to February 1992. The scope of the Loviisa 1 and 2 components studied was 44 respectively 95 MOVs. (25 refs., 22 figs., 8 tabs.)

  12. TPX remote maintenance and shielding

    International Nuclear Information System (INIS)

    The Tokamak Physics Experiment machine design incorporates comprehensive planning for efficient and safe component maintenance. Three programmatic decisions have been made to insure the successful implementation of this objective. First, the tokamak incorporates radiation shielding to reduce activation of components and limit the dose rate to personnel working on the outside of the machine. This allows most of the ex-vessel equipment to be maintained through conventional ''hands-on'' procedures. Second, to the maximum extent possible, low activation materials will be used inside the shielding volume. This resulted in the selection of Titanium (Ti-6Al-4V) for the vacuum vessel and PFC structures. The third decision stipulated that the primary in-vessel components will be replaced or repaired via remote maintenance tools specifically provided for the task. The component designers have been given the responsibility of incorporating maintenance design and for proving the maintainability of the design concepts in full-scale mockup tests prior to the initiation of final fabrication. Remote maintenance of the TPX machine is facilitated by general purpose tools provided by a special purpose design team. Major tools will include an in-vessel transporter, a vessel transfer system and a large component transfer container. In addition, tools such as manipulators and remotely operable impact wrenches will be made available to the component designers by this group. Maintenance systems will also provide the necessary controls for this equipment

  13. TPX remote maintenance and shielding

    International Nuclear Information System (INIS)

    The Tokamak Physics Experiment (TPX) machine design incorporates comprehensive planning for efficient and safe component maintenance. Three programmatic decisions have been made to insure the successful implementation of this objective. First, the tokamak incorporates radiation shielding to reduce activation of components and limit the dose rate to personnel working on the outside of the machine. This allows most of the ex-vessel equipment to be maintained through conventional open-quotes hands-onclose quotes procedures. Second, to the maximum extent possible, low activation materials will be used inside the shielding volume. This resulted in the selection of Titanium (Ti-6Al-4V) for the vacuum vessel and Plasma Facing Components (PFC) structures. The third decision stipulated that the primary in-vessel components will be replaced or repaired via remote maintenance tools specifically provided for the task. The component designers have been given the responsibility of incorporating maintenance design and for proving the maintainability of the design concepts in full-scale mockup tests prior to the initiation of final fabrication. Remote maintenance of the TPX machine is facilitated by general purpose tools provided by a special purpose design team. Major tools will include an in-vessel transporter, a vessel transfer system and a large component transfer container. In addition, tools such as manipulators and remotely operable impact wrenches will be made available to the component designers by this group. Maintenance systems will also provide the necessary controls for this equipment

  14. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  15. Reliability analyses used by maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Rusek, S.; Gono, R.; Kral, V.; Kratky, M. [VSB Technical Univ. of Ostrava, Poruba (Czech Republic)

    2008-07-01

    A series of studies have been conducted to analyze failures that have been experienced by most power distribution companies in the Czech Republic and in one of the Slovak Republics. The purpose was to find ways to optimize the maintenance of distribution network devices. Data was compiled to enable a comparison of results and to create a statistically more important database. Since the number of failures in the area of electrical power engineering have been rather small, the results on element reliability will only be available in several more years to come. The main challenge with reliability analysis is to find reliable and updated input data. As such, the primary task is to change the existing structure of databases of power distribution companies. These databases must be adjusted to get the input data for the calculation functions of reliability centred maintenance (RCM). This paper described the programs designed for analyses of reliability indices and the optimization of maintenance of equipment of the distribution system that will provide basic data for responsible and logical decisions regarding maintenance and basic data for the preparation of an effective maintenance schedule and the creation of a feedback system. 7 refs., 4 figs.

  16. Clustering and scheduling maintenance tasks over time

    OpenAIRE

    Kreuger, Per

    2008-01-01

    We report results on a maintenance scheduling problem. The problem consists of allocating maintenance task instances to and scheduling the performances of a suitable number of maintenance packages. The number of maintenance packages is not fixed, nor is, in general, the dates or durations of their performances. A constraint programming (CP) model and solver for the problem is presented together with preliminary computational results.

  17. 46 CFR 185.702 - Maintenance.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Maintenance. 185.702 Section 185.702 Shipping COAST...) OPERATIONS Operational Readiness, Maintenance, and Inspection of Lifesaving Equipment § 185.702 Maintenance. (a) The manufacturer's instructions for onboard maintenance of survival craft, rescue boats,...

  18. 18 CFR 367.81 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Maintenance. 367.81... Expense Instructions § 367.81 Maintenance. (a) The cost of maintenance chargeable to the various operating... maintenance work. A list of work operations applicable generally to service company property is included...

  19. 46 CFR 122.702 - Maintenance.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Maintenance. 122.702 Section 122.702 Shipping COAST..., Maintenance, and Inspection of Lifesaving Equipment § 122.702 Maintenance. (a) The manufacturer's instructions for onboard maintenance of survival craft, rescue boats, and launching appliances, manufactured on...

  20. 23 CFR 633.208 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 633.208 Section 633.208 Highways FEDERAL... PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.208 Maintenance. Maintenance of all highway... responsibility of the State. The State may arrange for maintenance of such roads or portions thereof,...

  1. Procedures when calculating economy for building envelopes in Denmark

    DEFF Research Database (Denmark)

    Rudbeck, Claus Christian; Svendsen, Sv Aa Højgaard

    1999-01-01

    Until a few years ago, economy in public funded buildings during construction or retrofitting was focused on investment cost and not very much on the cost for maintenance and energy use. Lately there has been a change in the rules and laws from the Ministry of Housing, resulting in the possibility...... of using total-economy. Total-economy incorporates all present and future investments (e.g. operational and maintenance costs) into one number making it possible to invest more money when constructing a building and save the money later on due to lower cost for maintenance and energy consumption...

  2. Reactor building

    International Nuclear Information System (INIS)

    The present invention concerns a structure of ABWR-type reactor buildings, which can increase the capacity of a spent fuel storage area at a low cost and improved earthquake proofness. In the reactor building, the floor of a spent fuel pool is made flat, and a depth of the pool water satisfying requirement for shielding is ensured. In addition, a depth of pool water is also maintained for a equipment provisionally storing pool for storing spent fuels, and a capacity for a spent fuel storage area is increased by utilizing surplus space of the equipment provisionally storing pool. Since the flattened floor of the spent fuel pool is flushed with the floor of the equipment provisionally storing pool, transfer of horizontal loads applied to the building upon occurrence of earthquakes is made smooth, to improve earthquake proofness of the building. (T.M.)

  3. Building Languages

    Science.gov (United States)

    ... family's native language) is taught as the child's second language through reading, writing, speech, and use of residual ... that parents can use to help their child learn language. There are many types of building blocks, and ...

  4. Sensitivities in Structural Maintenance Planning

    DEFF Research Database (Denmark)

    Faber, Michael Havbro; Kroon, I.B.; Sørensen, John Dalsgaard

    1996-01-01

    A general description of optimal inspection and maintenance planning based on the classical decision theory and the modern reliability theory is given. A number of simplifications to this description is given leading to more appropriate formulations for practical applications. Sensitivities of both...... optimal inspection and maintenance plans as well as the associated costs are given with respect to the assumptions on which the planning has been performed. These sensitivities indicate the significance of the individual assumptions and may be used as a decision tool to reject particular optimal...... inspection and maintenance plans showing too large sensitivity. An example from the offshore industry is given to indicate how the methodologies can be used in practical applications....

  5. Maintenance organization and outage planning in NPPs

    International Nuclear Information System (INIS)

    The Nuclear Society of the Russian Federation is responsible for all commercial electric power generation in nuclear power plants in Russia (ie., 9 nuclear power plants), and for managing several maintenance enterprises and other technical support organizations. The current status is presented of the maintenance policy and the organization of the maintenance. The impact of maintenance on the reliability of the nuclear power plant systems, and the methods for developing maintenance improvement practices are described. (Z.S.) 4 figs

  6. Selective Maintenance Model Considering Time Uncertainty

    Directory of Open Access Journals (Sweden)

    Le Chen

    2012-08-01

    Full Text Available This study proposes a selective maintenance model for weapon system during mission interval. First, it gives relevant definitions and operational process of material support system. Then, it introduces current research on selective maintenance modeling. Finally, it establishes numerical model for selecting corrective and preventive maintenance tasks, considering time uncertainty brought by unpredictability of maintenance procedure, indetermination of downtime for spares and difference of skill proficiency between staffs. The adaptability and flexibility of selective maintenance model are improved dramatically.

  7. Total Productive Maintenance at Paccar INC

    OpenAIRE

    Ştefan Farkas

    2010-01-01

    This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  8. Total Productive Maintenance at Paccar INC

    Directory of Open Access Journals (Sweden)

    Ştefan Farkas

    2010-06-01

    Full Text Available This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  9. NWCF maintenance features and capabilities

    International Nuclear Information System (INIS)

    A New Waste Calcining Facility is being built at the Idaho Chemical Processing Plant to replace the existing Waste Calcining Facility which was built to demonstrate fluidized-bed solidification of highly radioactive liquid wastes. The new facility is being designed to provide a higher waste throughput, more corrosion resistant materials of construction, more effective cleanup of effluent streams, and extensive remote maintenance and equipment replacement capability. The facility will also contain extensive decontamination capability should contact maintenance become necessary. The facility is presently in construction and is scheduled for hot operation in 1980

  10. Guidelines for Purchasing an Apartment and the Execution of Maintenance Works

    OpenAIRE

    Abramova, Daria

    2011-01-01

    The purpose of the study was to develop guidelines for a foreigner who decides to buy an apartment in Finland and for an apartment owner who decides to carry out maintenance works in apartment facilities. The main tasks of the study were to describe the process of purchasing and the execution of maintenance works within a housing company. In addition, our task was to examine building materials used for the renovation. The study was commissioned by supervisor from university – Mr. Raine Valton...

  11. A prototype expert system which assigns aviation maintenance personnel to squadron billets

    OpenAIRE

    Alston, Thomas Porter

    1987-01-01

    The technical feasibility of developing an expert system to support the assignment of squadron maintenance personnel to authorized billets is examined by building a prototype system. The rules used by an assistant maintenance officer to assign personnel are analyzed, and a database derived from the OPNAV 1000/2 and EDVR is designed. The prototype is developed for a micro-computer system using an expert system shell, Insight 2+, and is fully integrated with dBase III files

  12. Maintenance model for the No. 2 1300 MW unit at Philippsburg nuclear power station

    International Nuclear Information System (INIS)

    In 1979 a maintenance model to the scale 1:1 was constructed for the second extension of Philippsburg Nuclear Power Station. The objective of this model, the building of which was completed at the end of 1982, the physical arrangement of the overall maintenance regime and the practice-oriented application of the ergonomics, in particular in relation to the optimization of the man-machine interface, are described. (orig.)

  13. NRC new sustainable building

    International Nuclear Information System (INIS)

    'Full text:' The National Research Council Institute For Fuel Cell Innovation is relocating to a purpose-built 71,343 sq. Ft. (6598 sq. M) Research, Testing, Evaluation, and Industry Incubation Facility in the spring of 2006. The new facility will contain Hydrogen-ready laboratories, the existing relocated Hydrogen Safe Environmental Test Chamber, a hydrogen vehicle maintenance bay, a hydrogen vehicle refuelling station, and the following demonstration projects and features: 1. A Ground Source Heat Pump: This long-proven natural-source heating and cooling technology to provide climate control for the new IFCI's atrium and galleria. It is being designed by Keen Engineering of North Vancouver, BC. 2. 5 KW Solid Oxide Fuel Cell System: Fuelled by natural gas and in the future, from biomass, the fuel cell will also produce approximately 15 kW of waste heat, which will be captured and used to supply heat for the building. The Solid Oxide Fuel Cell will be supplied by Fuel Cell Technologies in Kingston, ON. 3. LEED Building certification: Attaining LEED 'green building' certification is considered an important complement to the plans for the new NRC-IFCI, because it will provide respected third-party verification of government's commitment to efficient building design and construction. Project architects Bunting Coady of Vancouver, BC believe the IFCI has strong potential to earn gold LEED certification. 4. Photovoltaic hydrogen source for back-up power fuel cell system: A photovoltaic array will capture energy from sunlight to power an electrolyzer that will produce and store hydrogen for a PEM fuel cell emergency backup power system. The electrolyzer will be provided by Hydrogenics of Mississauga, ON. Photovoltaics are being designed and installed by the British Columbia Institute of Technology. (author)

  14. Proceedings of the Canadian Nuclear Society CANDU maintenance conference

    International Nuclear Information System (INIS)

    The conference proceedings comprise 51 papers on the following aspects of maintenance of CANDU reactors: Major maintenance projects, maintenance planning and preparation, maintenance effectiveness, future maintenance issues, safety and radiation protection. The individual papers have been abstracted separately

  15. Afrikaans Language Maintenance in Australia

    Science.gov (United States)

    Hatoss, Aniko; Starks, Donna; van Rensburg, Henriette Janse

    2011-01-01

    Changes in the political climate in the home country have resulted in the emigration of South Africans to English speaking countries such as Britain, Canada, Australia and New Zealand. Despite the scale of movement of the South African population, language maintenance in these diasporic contexts has received little consideration. This paper…

  16. Avionics Maintenance Technology Program Guide.

    Science.gov (United States)

    Georgia Univ., Athens. Dept. of Vocational Education.

    This program guide presents the avionics maintenance technology curriculum for technical institutes in Georgia. The general information section contains the following for both the diploma program and the associate degree program: purpose and objectives; program description, including admissions, typical job titles, and accreditation and…

  17. Maintenance robot for PWR plant

    International Nuclear Information System (INIS)

    The remote operation, automatic machines utilized in the field of the maintenance of component machinery and equipment in nuclear power plants, so-called maintenance robots, have produced effects in the reduction of radiation exposure, the improvement of the quality of working, the shortening of working time and so on, but still many robots have their specialized functions. The expectation of present day society to robots has been diversified, and the technical development of high function robots is advanced positively. In this report, the recent examples of the high function robots developed for PWR power stations with the support of technical progress and the trend of the technical development are explained. The needs and seeds of maintenance robot development are discussed. As the examples of heightening the functions of maintenance robots, the next generation ultrasonic testing machine highly advanced by sensor technology and size and weight reduction mechanism technology, the intelligent monitoring system for welding using AI technology and other manpower-saving robots are shown. (K.I.)

  18. Computer-Assisted School Maintenance

    Science.gov (United States)

    Kennedy, Mike

    2012-01-01

    At thousands of schools and universities, years of economic troubles have led to repeated budget cuts. The reductions typically fall disproportionately on maintenance departments, where cuts are viewed as less critical than those that directly affect classroom instruction. And so nearly every facility manager at an education institution faces a…

  19. Dynamic Evolution of Squeezing Maintenance

    Science.gov (United States)

    Wan, Zhi-Long; Fan, Hong-Yi

    2016-08-01

    By virtue of the coherent state representation and solving Riccati equation we derive dynamic evolution operator for maintaining squeezing, i.e., we demonstrate that the final state keeps squeezing when the initial state is a squeezed vacuum state. The number-phase squeezing maintenance mechanism is also studied.

  20. Coastal maintenance in the Netherlands

    NARCIS (Netherlands)

    Verhagen, H.J.

    1991-01-01

    The government of The Netherlands has decided in the summer of 1990 to maintai.n the coastline at the position of 1990. This will be done mainly by artificial beach nourishment. The costs will be paid by the national government. The purpose of this coastal maintenance is to maintain a sufficient lev

  1. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  2. Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

    International Nuclear Information System (INIS)

    Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

  3. Safety culture in the maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Safety culture is the complexity of beliefs, shared values and behaviour reflected in making decisions and performing work in a nuclear power plant or nuclear facility. The definition of safety culture and the related concepts presented in the IAEA literature are widely known to experts. Since the publication of Safety Culture, issued by the IAEA as INSAG-4 in 1991, the IAEA has produced a number of publications on strengthening the safety culture in organizations that operate nuclear power plants and nuclear facilities. However, until now the focus has been primarily on the area of operations. Apart from operations, maintenance in plants and nuclear facilities is an aspect that deserves special attention, as maintenance activities can have both a direct and an indirect effect on equipment reliability. Adverse safety effects can arise, depending upon the level of skill of the personnel involved, safety awareness and the complexity of the work process. Any delayed effects resulting from challenges to maintenance can cause interruptions in operation, and hence affect the safety of a plant or facility. Building upon earlier IAEA publications on this topic, this Safety Report reviews how challenges to the maintenance of nuclear power plants can affect safety culture. It also highlights indications of a weakening safety culture. The challenges described are in areas such as maintenance management; human resources management; plant condition assessment and the business environment. The steps that some Member States have taken to address safety culture aspects are detailed and singled out as good practices, with a view to disseminating and exchanging experiences and lessons learned. Although this report is primarily directed at plant maintenance organizations, the subject matter is applicable to a wider audience, including plant contracting organizations and regulatory authorities

  4. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    ‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...... evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system...

  5. Competence Building

    DEFF Research Database (Denmark)

    Borrás, Susana; Edquist, Charles

    The main question that guides this paper is how governments are focusing (and must focus) on competence building (education and training) when designing and implementing innovation policies. With this approach, the paper aims at filling the gap between the existing literature on competences on the...... one hand, and the real world of innovation policy-making on the other, typically not speaking to each other. With this purpose in mind, this paper discusses the role of competences and competence-building in the innovation process from a perspective of innovation systems; it examines how governments...... and public agencies in different countries and different times have actually approached the issue of building, maintaining and using competences in their innovation systems; it examines what are the critical and most important issues at stake from the point of view of innovation policy, looking...

  6. Maintenance, repair and operation (MRO) of shutdown facilities

    International Nuclear Information System (INIS)

    What level of maintenance does one apply to a shutdown facility? Well it depends on who you ask. Operations staff sees facilities that have completed their useful life cycle as a cost drain while Decommissioning staff sees this as the start of a new life cycle. Based on the decommissioning plan for the particular facility the building could complete another full life cycle while under decommissioning whether it is in storage with surveillance mode or under active decommissioning. This paper will explore how you maintain a facility and systems for many years after its useful life until final decommissioning is completed. When a building is declared redundant, who looks after it until the final decommissioning end state is achieved? At the AECL, Chalk River Labs site the safe shutdown and turnover process is one key element that initiates the decommissioning process. The real trick is orchestrating maintenance, repair and operation plans for a facility that has been poorly invested in during its last years of useful life cycle. To add to that usually shutdowns are prolonged for many years beyond the expected turnover period. During this presentation I will cover what AECL is doing to ensure that the facilities are maintained in a proper state until final decommissioning can be completed. All facilities or systems travel through the same life cycle, design, construction, commissioning, operation, shutdown and demolition. As we all know, nuclear facilities add one more interesting twist to this life cycle called Decommissioning that lands between shutdown and demolition. As a facility nears the shutdown phase, operations staff loose interest in the facility and stop investing in upgrades, repairs and maintenance but continue to invest and focus on maximizing operations. Facility maintenance standards produced by the International Facility Maintenance Association (IFMA) based on a survey done every year state that 2.2% of the total operating costs for the site should be

  7. Building Bridges

    DEFF Research Database (Denmark)

    The report Building Bridges adresses the questions why, how and for whom academic audience research has public value, from the different points of view of the four working groups in the COST Action IS0906 Transforming Audiences, Transforming Societies – “New Media Genres, Media Literacy and Trust...... in the Media”, “Audience Interactivity and Participation”, “The Role of Media and ICT Use for Evolving Social Relationships” and “Audience Transformations and Social Integration”. Building Bridges is the result of an ongoing dialogue between the Action and non-academic stakeholders in the field of audience...

  8. Design of the system of maintenance operations occupational safety and health database application of nuclear power station

    International Nuclear Information System (INIS)

    Based on the KKS code of building equipment in nuclear power station, this paper introduces the method of establishing the system of maintenance operation occupational safety and health database application. Through the application system of maintenance occupational safety and health database, it can summarize systematically all kinds of maintenance operation dangerous factor of nuclear power station, and make a convenience for staff to learn the maintenance operation dangerous factors and the prevention measures, so that it can achieve the management concept of 'precaution crucial, continuous improvement' that advocated by OSHMS. (authors)

  9. Performance Centered Maintenance as a Core Policy in Strategic Maintenance Control

    OpenAIRE

    Apallius de Vos, Jack I.; Dongen, van, E.

    2015-01-01

    Rolling stock maintenance in the Netherlands traditionally is performed on several levels of complexity and therefore on levels of non-availability and cost. The challenge in optimizing performance and cost of rolling stock maintenance is to integrate the policy on maintenance concepts, maintenance locations and maintenance intervals (what, when & where). NedTrain as a subsidiary of the Netherlands Railways is developing and implementing this improved concept of maintenance. On one hand maint...

  10. Deployment maintenance strategy for the development of maintenance personnel in Irish and Malaysian automated manufacturing industries

    OpenAIRE

    Othman, Jamel

    2006-01-01

    In order to ensure that a manufacturing company is able to achieve the optimum productivity and equipment reliability, an effective maintenance system must be implemented. However it is very important to realize that the maintenance employee involvement is a critical factor in the maintenance implementation stage. An effective maintenance requires an understanding of the link between the maintenance and maintenance employee involvement. As such, there is a need for empirical research on the d...

  11. Total Quality Maintenance (TQMain) A predictive and proactive maintenance concept for software

    OpenAIRE

    Williamsson, Ia

    2006-01-01

    This thesis describes an investigation of the possibility to apply a maintenance concept originally developed for the industry, on software maintenance. Today a large amount of software development models exist but not many of them treat maintenance as a part of the software life cycle. In most cases maintenance is depicted as an activity towards the end of the software life cycle. The high cost ascribed to software maintenance motivates for improvements. The maintenance concept TQMain propos...

  12. Optimization of NPP and TPP maintenance programs

    International Nuclear Information System (INIS)

    A new structured approach to the maintenance program for NPP and TPP is proposed. The aim is to enhance efficiency by improving nuclear safety, reliability and availability of the plants. This will be achieved by replacing the system of scheduled preventive maintenance with actions of corrective maintenance. The new optimized program includes the following elements: reliability centred maintenance approach; technical diagnostics and forecasting; overall maintenance expenditure reduction; analysis and comparison of data; computerized system for maintenance management with necessary hardware and software. 3 figs., 8 refs

  13. RCM (Reliability Centered Maintenance) og WCM (World Class Maintenance)

    OpenAIRE

    Pedersen, Tom Ivar

    2011-01-01

    More complex and integrated equipment and the introduction of manufacturing philosophies like lean, with the reduction of buffers of inventory, has made the production environment more interconnected than before. This “have clearly put more pressure on the maintenance system, because disruption to production flows can quickly become costly by rapid disruption a large part of the operation” (Márquez, 2007, s. 12). To meet this challenges systematic techniques for the development of programmers...

  14. IMPROVING THE QUALITY OF MAINTENANCE PROCESSES USING INFORMATION TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    Zora Arsovski

    2008-06-01

    Full Text Available In essence, process of maintaining equipment is a support process, because it indirectly contributes to operational ability of the production process necessary for the supply chain of the new value. Taking into account increased levels of automatization and quality, this proces s becomes more and more significant and for some branches of industry, even crucial. Due to the fact that the quality of the entire process is more and more dependent on the maintenance process, these processes must be carefully designed and effectively im plemented. There are various techniques and approaches at our disposal, such as technical, logistical and intensive application of the information - communication technologies. This last approach is presented in this work. It begins with organizational goa ls, especially quality objectives. Then, maintenance processes and integrated information system structures are defined. Maintenance process quality and improvement processes are defined using a set of performances, with a special emphasis placed on effectiveness and quality economics. At the end of the work, information system for improving maintenance economics is structured. Besides theoretical analysis, work also presents results authors obtained analyzing food industry, metal processing industry an d building materials industry.

  15. Using condition-based maintenance and reliability-centered maintenance to improve maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    Maintenance optimization process in nuclear power plants (NPPs) has, in recent decades, been driving the transition of maintenance strategies from time-based preventive maintenance to systematic strategies depending on both equipment condition and reliability analysis. Starting with a comparison of various types of maintenance strategies in current NPPs, this paper highlights the evident advantages of condition-based maintenance (CBM) in both technical feasibility and cost-effectiveness. This paper also expounds the theoretical foundation and application methodology of CBM, as well as the complementary relationship between CBM and RCM. Taking Daya Bay nuclear power base as a case example, we introduce in detail the experience of using Reliability-centered Maintenance (RCM) and CBM to drive maintenance improvement in NPPs, which serves as a cornerstone for the application of RCM analysis-based CBM maintenance in other plants. (author)

  16. Sustainable Buildings

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Elle, Morten

    The scientific community agrees that: all countries must drastically and rapidly reduce their CO2 emissions and that energy efficient houses play a decisive role in this. The general attitude at the workshop on Sustainable Buildings was that we face large and serious climate change problems that...

  17. Maintenance and inspection plan for ETRR-2

    International Nuclear Information System (INIS)

    Safety is the most important issue considered by ETRR-2 management during the reactor operation and utilization. Among others, effective maintenance is one of the most important specific activities to achieve safety. The ETRR-2 Maintenance program and inspection plan is adopted to ensure that the system, subsystem and components continue to operate as desired with the capability to meet the design objectives. Moreover, it is also to ensure that the reactor safety is not affected by subsequent operations. The ETRR-2 Manager has the overall responsibility for all aspects on maintenance while the maintenance head has the direct responsibility. ETRR-2 maintenance group is divided into four units: mechanical maintenance unit, electrical maintenance unit, electronics maintenance unit, and chemical maintenance unit. The intended safety function of every reactor component and system is checked on daily, weekly, monthly, semiannual and annual bases by means of preventive and predictive maintenance program and inspection test plan. Safety and safety related components are given high priority. Deficiencies thus detected are corrected in time. Maintenance activities are carried out in accordance with written and approved procedures. The maintenance procedures are developed by ETRR-2 maintenance personal in cooperation with system designers and based upon the manufacturer recommendations and consideration of the experience gained from similar facilities. Maintenance personnel are kept well trained on all maintenance activities. Documents that define the maintenance activities and associated historical data are subject to managerial control within the QA program for ETRR-2 operation. Maintenance procedures are ensuring that the control room operators are kept informed of the status of any such work under way. (author)

  18. Re-Assessing Green Building Performance: A Post Occupancy Evaluation of 22 GSA Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, Kimberly M.; Rauch, Emily M.; Henderson, Jordan W.; Kora, Angela R.

    2010-06-01

    2nd report on the performance of GSA's sustainably designed buildings. The purpose of this study was to provide an overview of measured whole building performance as it compares to GSA and industry baselines. The PNNL research team found the data analysis illuminated strengths and weaknesses of individual buildings as well as the portfolio of buildings. This section includes summary data, observations that cross multiple performance metrics, discussion of lessons learned from this research, and opportunities for future research. The summary of annual data for each of the performance metrics is provided in Table 25. The data represent 1 year of measurements and are not associated with any specific design features or strategies. Where available, multiple years of data were examined and there were minimal significant differences between the years. Individually focused post occupancy evaluation (POEs) would allow for more detailed analysis of the buildings. Examining building performance over multiple years could potentially offer a useful diagnostic tool for identifying building operations that are in need of operational changes. Investigating what the connection is between the building performance and the design intent would offer potential design guidance and possible insight into building operation strategies. The 'aggregate operating cost' metric used in this study represents the costs that were available for developing a comparative industry baseline for office buildings. The costs include water utilities, energy utilities, general maintenance, grounds maintenance, waste and recycling, and janitorial costs. Three of the buildings that cost more than the baseline in Figure 45 have higher maintenance costs than the baseline, and one has higher energy costs. Given the volume of data collected and analyzed for this study, the inevitable request is for a simple answer with respect to sustainably designed building performance. As previously stated

  19. Adaptive exoskeleton for the integrated retrofit of social housing buildings

    OpenAIRE

    Scuderi, Giuliana

    2016-01-01

    This doctoral thesis presents technical strategies for the rational maintenance of the building heritage directed at the integrated retrofit of social housing stocks. The study comprised the analysis of recovered residential buildings in order to develop new sceneries to adopt in critical situations, leading to the definition of a new experimental practice called “adaptive exoskeleton”. This strategy involves the wrapping of the entire original building with a three-dimensional st...

  20. BIM and energy efficient retrofitting in school buildings

    OpenAIRE

    Villa, Valentina; Piantanida, Paolo

    2015-01-01

    The aim of the research project presented in this paper is to experiment actions to improve the existing school building management and maintenance through a technological and process innovation based on the Building Information Modeling (BIM). In the field of refurbishment and reuse of existing buildings, some of the most sensible and specific sectors are investigated, particularly focusing on energy efficiency, structural improvement, up-to-date information on completed works and quality co...

  1. Introducing the Web-of-Things in Building Automation: A Gateway for KNX installations

    OpenAIRE

    Bovet, Gérôme; Hennebert, Jean

    2013-01-01

    Due to increasing energy costs and the importance of the comfort, smart buildings tend to democratize both in new and renovated constructions, based on management systems relying on dedicated networks. Network heterogeneity leads to complex building management systems having to implement all the protocols of the building networks, resulting in low system integration and heavy maintenance efforts. Those building networks offer no common standardized application layer to build applications. To ...

  2. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Malmqvist, Stefan; Leboeuf-Yde, Charlotte

    2009-01-01

    Maintenance care is a well known concept among chiropractors, although there is little knowledge about its exact definition, its indications and usefulness. As an initial step in a research program on this phenomenon, it was necessary to identify chiropractors' rationale for their use of...... maintenance care. Previous studies have identified chiropractors' choices of case management strategies in response to different case scenarios. However, the rationale for these management strategies is not known. In other words, when presented with both the case, and different management strategies, there...... was consensus on how to match these, but if only the management strategies were provided, would chiropractors be able to define the cases to fit these strategies? The objective with this study was to investigate if there is a common pattern in Finnish chiropractors' case management of patients with...

  3. Procedures for maintenance and repairs

    International Nuclear Information System (INIS)

    After a general review of the operation experience in the history of more than 12 operating years, the organization in the plant will be shown with special aspect to quality assurance, capacity of the workshops and connected groups as radiation protection, chemical laboratories etc. The number, time intervals and manpower effort for the repeating tests will be discussed. Reasons and examples for back-fitting activities in the plant are given. Besides special repair and maintenance procedures as repair of the steam generators, in-service inspection of the reactor pressure vessel, repair of a feed-water pipe and repair of the core structure in the pressure vessel, the general system to handle maintenance and repair-work in the KWO-plant will be shown. This includes also the detailed planning of the annual refueling and revision of the plant. (orig./RW)

  4. Mining Surveillance and Maintenance Dollars

    International Nuclear Information System (INIS)

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S and M) activities. However, ongoing S and M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations

  5. The Evidence Regarding Maintenance Tocolysis

    Directory of Open Access Journals (Sweden)

    John P. Elliott

    2013-01-01

    Full Text Available Preterm delivery is a public health issue of major proportion. More than 12% of deliveries in the United States that occur at less than 37 weeks gestation preterm labor (PTL represents the largest single reason for preterm birth (PTB. Attempts to prevent PTB have been unsuccessful. This paper of maintenance tocolytic therapy will examine the efficacy and safety of the drugs, both oral and subcutaneous, which have been utilized for prolongation of pregnancy following successful arrest of a documented episode of acute preterm labor. The evidence for oral tocolytics as maintenance therapy as well as parenteral medications for such patients is offered. Finally, the effects in the United States of the Food and Drug Administration (FDA action on such medications are reported.

  6. RA reactor operation and maintenance in 1999, Part 1

    International Nuclear Information System (INIS)

    Activities at the RA reactor in 1999 were defined according to the needs of maintaining the reactor components and systems according to the existing funding. Basic activities during the past year were related to the maintenance of the reactor devices which must be in constant operation (special and regular ventilation power supply system, radioactivity and contamination control system, internal transportation system), reactor security system, and other systems that are useful independent of the future status of the reactor. (secondary cooling system, hot cells). maintenance of the reactor building was done on a limited scale due to lack of financial support. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown

  7. RA reactor operation and maintenance in 1998, Part 1

    International Nuclear Information System (INIS)

    Activities at the RA reactor in 1998 were defined according to the needs of maintaining the reactor components and systems according to the existing funding. Basic activities during the past year were related to the maintenance of the reactor devices which must be in constant operation (special and regular ventilation power supply system, radioactivity and contamination control system, internal transportation system), reactor security system, and other systems that are useful independent of the future status of the reactor. (secondary cooling system, hot cells). maintenance of the reactor building was done on a limited scale due to lack of financial support. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown

  8. Knowledge representation for integrated plant operation and maintenance

    DEFF Research Database (Denmark)

    Lind, Morten

    2010-01-01

    states and goals and incorporate knowledge about redundancy and reliability data. Multilevel Flow Modeling can be used build knowledge bases representing plant goals and functions and has been applied for fault diagnosis and supervisory control but currently it does not take into account structural...... information. The paper will extend Multilevel Flow Modeling with foundational concepts to represent relations between plant structure and functions. The paper will present results from MFM studies of heat transfer and chemical engineering systems showing that structural information can be included in MFM......Integrated operation and maintenance of process plants has many advantages. One advantage is the improved economy obtained by reducing the number of plant shutdowns. Another is to increase reliability of operation by monitoring of risk levels during on-line maintenance. Integrated plant operation...

  9. Machine maintenance: the rules of the game

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    GCO, GMIO, GSPO – ever heard of them? These acronyms stand for the “roles” that best practices identify as vital to successful maintenance management. CERN’s Maintenance Management Project (MMP) team is working with the technical departments to ensure that they implement these procedures when they deal with the maintenance of the collider and its injectors and infrastructure.   The participants of the workshop on asset and maintenance management (AMMW2013), which took place at CERN in November. Since its creation in 2012, CERN’s Maintenance Framework Implementation Office (MFIO) has been promoting the deployment of harmonised maintenance management methods across the BE, GS, EN and TE Departments. “The definition and identification of the Group Coding Officers (GCO), Group Maintenance Information Officers (GMIO) and Group Spare Part Officers (GSPO) are one of the best practices that should be adopted each time a maintenance programme...

  10. The maintenance rule and operational experience

    International Nuclear Information System (INIS)

    The goal of the program of the Maintenance Rule is optimize maintenance ensuring appropriate behavior, both in terms of reliability and availability, structures, systems and components (SSCs) within the scope defined against a pre-established performance criteria

  11. Dynamic contracting mechanism for pavement maintenance management

    NARCIS (Netherlands)

    Demirel, H.C.; De Ridder, H.A.J.

    2013-01-01

    Technological advances, financial possibilities and changes of demands have increasingly affected the pavement maintenance environment for outsourcing in recent years. This induces complexity in the contracting methods of pavement maintenance activities. Despite the fact that current contracting pra

  12. Ongoing maintenance of CANDU control computers

    International Nuclear Information System (INIS)

    The authors focus on the maintenance of control computer hardware. The paper deals with various maintenance skills and strategies proven through experience. The importance of spare parts is emphasized

  13. System safety assessment by maintenance indicator

    International Nuclear Information System (INIS)

    The Maintenance Indicator was applied to evaluate the safety of nuclear power plants. A method was proposed to evaluate the reliability for 'a function' required for the system safety from the viewpoint of maintenance. (author)

  14. Chromatin replication and epigenome maintenance

    DEFF Research Database (Denmark)

    Alabert, Constance; Groth, Anja

    2012-01-01

    Stability and function of eukaryotic genomes are closely linked to chromatin structure and organization. During cell division the entire genome must be accurately replicated and the chromatin landscape reproduced on new DNA. Chromatin and nuclear structure influence where and when DNA replication...... initiates, whereas the replication process itself disrupts chromatin and challenges established patterns of genome regulation. Specialized replication-coupled mechanisms assemble new DNA into chromatin, but epigenome maintenance is a continuous process taking place throughout the cell cycle. If DNA...

  15. Maintenance management experiences at Rajasthan Atomic Power Station [Paper No.: I-1

    International Nuclear Information System (INIS)

    Maintenance management experiences at the Rajasthan Atomic Power Station (RAPS) in commissioning of its two reactor units and in maintenance of the first reactor unit are described. Based on these experiences, certain recommendations are made which include: (1) constant guiding by the maintenance engineers of the maintenance personnel assigned to individual commissioning groups, (2) bringing uniformity in maintenance procedures and record keeping, (3) provision of adequate areas for mechanical shop, electrical shop, control maintenance shop and fueling machine maintenance shop, (4) provision of separate areas for active work just outside the reactor building, (5) provision of area for sectional stores for controlled issue/use of consumables, (6) formation of a separate services group for house-keeping, laundering, clothing etc; (7) planning for availability of spares based on review of failure rates, (8) planning of a preventive maintenance programme, (9) maintaining a visadex system to keep record of details of all equipment including equipment history, and (10) reviewing staffing and training from time-to-time. (M.G.B.)

  16. Maintenance of nuclear medicine instruments

    International Nuclear Information System (INIS)

    Maintenance of instruments is generally of two kinds: (a) corrective maintenance, on a non-scheduled basis, to restore equipment to a functional status by repairs; (b) preventive maintenance, to keep equipment in a specified functional condition by providing systematic inspection, quality control, detection and correction of early malfunctions. Most of the instruments used in nuclear medicine are rather complex systems built from mechanical, electrical and electronic parts. Any one of these components is liable to fail at some time or other. Repair could be done only by a specialist who is able to evaluate the condition of the various parts ranging from cables to connectors, from scintillators to photomultipliers, from microprocessors to microswitches. The knowledge of the intricacies of the various electronic components required for their repairs is quite wide and varied. The electronics industry turns out more and more multi-purpose chips which can carry out the functions of many parts used in the instruments of the earlier generation. This provides protection against unauthorized copying of the circuits but it serves another purpose as well of inhibiting repairs by non-factory personnel. These trends of the instrument design should be taken into consideration when a policy has to be developed for the repairs of the hospital based equipment

  17. Demonstration of reliability centered maintenance

    International Nuclear Information System (INIS)

    Reliability centered maintenance (RCM) is an approach to preventive maintenance planning and evaluation that has been used successfully by other industries, most notably the airlines and military. Now EPRI is demonstrating RCM in the commercial nuclear power industry. Just completed are large-scale, two-year demonstrations at Rochester Gas ampersand Electric (Ginna Nuclear Power Station) and Southern California Edison (San Onofre Nuclear Generating Station). Both demonstrations were begun in the spring of 1988. At each plant, RCM was performed on 12 to 21 major systems. Both demonstrations determined that RCM is an appropriate means to optimize a PM program and improve nuclear plant preventive maintenance on a large scale. Such favorable results had been suggested by three earlier EPRI pilot studies at Florida Power ampersand Light, Duke Power, and Southern California Edison. EPRI selected the Ginna and San Onofre sites because, together, they represent a broad range of utility and plant size, plant organization, plant age, and histories of availability and reliability. Significant steps in each demonstration included: selecting and prioritizing plant systems for RCM evaluation; performing the RCM evaluation steps on selected systems; evaluating the RCM recommendations by a multi-disciplinary task force; implementing the RCM recommendations; establishing a system to track and verify the RCM benefits; and establishing procedures to update the RCM bases and recommendations with time (a living program). 7 refs., 1 tab

  18. Demonstration of reliability centered maintenance

    International Nuclear Information System (INIS)

    Southern California Edison Company (SCE) has completed a two year demonstration of Reliability Centered Maintenance (RCM) at San Onofre Nuclear Generating Station (SONGS) Unit 2. The demonstration involved the application of detailed RCM analysis to 12 plant systems and the implementation of the preventive maintenance (PM) and testing recommendations from these analyses. Other tasks in support of the successful application and implementation included (1) the selection and prioritization of systems for RCM analysis, (2) employing RCM as the technical basis for technical specification change, and (3) development of an RCM living program. The overall objective of the project is to demonstrate that RCM can be cost-effectively performed in a nuclear plant environment. This report describes in detail the methodologies which evolved at SONGS to perform the above tasks. This report summarizes the recommendations from the analyses which include task deletions, task additions, task modifications, and design changes. A significant portion of these recommendations have been evaluated at SONGS, and the status of task implementation is described herein. Significant maintenance man-hour savings are documented on systems for which the recommendations have been evaluated and implemented. Insights of value for future RCM applications are enumerated. Finally, plans for continued use of RCM at SONGS are confirmed and described. 12 refs., 17 figs., 2 tabs

  19. Analysis and modeling of rail maintenance costs

    OpenAIRE

    Amir Ali Bakhshi; Mohammad Reza Soleymani Yazdi

    2012-01-01

    Railroad maintenance engineering plays an important role on availability of roads and reducing the cost of railroad incidents. Rail is of the most important parts of railroad industry, which needs regular maintenance since it covers a significant part of total maintenance cost. Any attempt on optimizing total cost of maintenance could substantially reduce the cost of railroad system and it can reduce total cost of the industry. The paper presents a new method to estimate the cost of rail fail...

  20. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.)

  1. Software maintenance : the need for standardization

    OpenAIRE

    Schneidewind, Norman F.

    1989-01-01

    Procedures are proposed to assist the Navy Management Systems Support Office in performing software maintenance. Hardware and software maintenance are contrasted. The key difference between the two -- the ease which software can be changed -- leads to the need for managing software change. Standardization of software is proposed as the method for managing software change. A model of software maintenance is advanced as the function for standardizing software maintenance. (kr)

  2. Environmental favourable foundries through maintenance activities

    OpenAIRE

    A. Saniuk; Jasiulewicz-Kaczmarek, M.; A. Samolejova; Saniuk, S.; R. Lenort

    2015-01-01

    Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help...

  3. Optimal use of German Army maintenance resources

    OpenAIRE

    Wellbrink, Joerg

    1998-01-01

    Approved for public release; distribution is unlimited The German Army's maintenance branch has lost 25 percent of its soldiers since the end of the cold war. The maintenance branch has insufficient military personnel within maintenance units to maintain all combat unit equipment. The Army, therefore, purchases civilian man hours (mhrs) to satisfy some required maintenance. This thesis develops a mixed integer linear program, named ADOPT (administrative order optimizer), to optimally assig...

  4. A Proactive Maintenance Scheme for Wireless Systems

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2008-01-01

    In the wireless sector maintenance costs form a large part of the total network operating cost. This paper presents a proactive maintenance scheme for wireless systems which is aimed at reducing the high operational costs encountered in the wireless industry by decreasing maintenance costs and system downtime. An on-line monitoring system is used to identify performance degradation, as well as its possible sources via symbol frequency distribution analysis. It ensures that maintenance occurs ...

  5. Optimal Maintenance Policies Under Different Operational Schedules

    OpenAIRE

    Wu, Shaomin; Clements-Croome, Derek

    2005-01-01

    In the reliability literature, maintenance time is usually ignored during the optimization of maintenance policies. In some scenarios, costs due to system failures may vary with time, and the ignorance of maintenance time will lead to unrealistic results. This paper develops maintenance policies for such situations where the system under study operates iteratively at two successive states: up or down. The costs due to system failure at the up state consist of both business losses & maintenanc...

  6. Requirements for a Software Maintenance Methodology

    OpenAIRE

    Nance, Richard E.; Arthur, James D.; Ciaramella, John A.

    1991-01-01

    This project ventures into the domain of software maintenance methodologies, an area given relatively little attention in software engineering. Project efforts are divided into three tasks: (1) definition of maintenance methodology requirements; (2) development of a model of the AEGIS maintenance process; and (3) specification of the requirements for an AEGIS maintenance methodology. The focus of this report is on the third task. The research utilizes the Objectives/Principles/Attributes (O...

  7. Heavy water detritiation to support CANDU station maintenance activities

    International Nuclear Information System (INIS)

    Heavy water and tritium control are important aspects of CANDU operation and have a major impact on station maintenance activities. Station personnel are trained to understand the importance of heavy water management and the economics and environmental impact of tritiated heavy water losses. This paper discusses new GE technology that can now make a major improvement in CANDU maintenance activities through significant reductions in station tritium levels. Tritium is of particular concern in the CANDU industry given the nature of heavy water reactors to build up high levels of tritium over time. High tritium levels in the reactor vault significantly slow down maintenance activities in the reactor vault due to the requirement for personnel protective equipment, including breathing apparatus and cumbersome plastic air suits. The difficulties increase as reactors age and tritium levels increase. Building upon GE's extensive operational experience in tritium management in CANDU reactors and its own tritium handling facility, GE. has developed a new large-scale diffusion based isotope separation process as an alternative to conventional cryogenic distillation. Having a tritium inventory an order of magnitude lower than conventional cryogenic distillation, this process is very attractive for heavy water detritiation, and applicable to single and multi-unit CANDU stations. This new process can now provide a step change reduction in CANDU heavy water tritium levels resulting in reduced environmental emissions and lowering reactor vault tritium MPC(a) levels. Reactor vault tritium can be reduced sufficiently for maintenance activities to be done without plastic suits, leading to shorter outages, improved station capacity factors, and improved station economics. (author)

  8. 14 CFR 91.1111 - Maintenance training.

    Science.gov (United States)

    2010-01-01

    ... Operations Program Management § 91.1111 Maintenance training. The program manager must ensure that all employees who are responsible for maintenance related to program aircraft undergo appropriate initial and... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Maintenance training. 91.1111 Section...

  9. 40 CFR 68.56 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Maintenance. 68.56 Section 68.56... ACCIDENT PREVENTION PROVISIONS Program 2 Prevention Program § 68.56 Maintenance. (a) The owner or operator... maintenance procedures. (b) The owner or operator shall train or cause to be trained each employee involved...

  10. 40 CFR 86.1725-99 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Maintenance. 86.1725-99 Section 86....1725-99 Maintenance. The provisions of § 86.094-25 and subsequent model year provisions apply to this... are subject to the applicable Otto-cycle or diesel engine maintenance requirements of § 86.094-25...

  11. 40 CFR 610.52 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Maintenance. 610.52 Section 610.52... DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a) Maintenance during the durability evaluation can best be considered in three separate categories: (1)...

  12. 14 CFR 145.217 - Contract maintenance.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Contract maintenance. 145.217 Section 145...) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.217 Contract maintenance. (a) A certificated repair station may contract a maintenance function pertaining to an article to...

  13. 49 CFR 192.749 - Vault maintenance.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Vault maintenance. 192.749 Section 192.749 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Maintenance § 192.749 Vault maintenance. (a) Each...

  14. 49 CFR 37.203 - Lift maintenance.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Lift maintenance. 37.203 Section 37.203... DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.203 Lift maintenance. (a) The entity shall establish a system of regular and frequent maintenance checks of lifts sufficient to determine if they are...

  15. 5 CFR 850.302 - Record maintenance.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Record maintenance. 850.302 Section 850... (CONTINUED) RETIREMENT SYSTEMS MODERNIZATION Records § 850.302 Record maintenance. (a) The retirement and..., for the initiation and maintenance of records, evidence, or other information described in this...

  16. 40 CFR 86.001-25 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Maintenance. 86.001-25 Section 86.001...-Fueled and Methanol-Fueled Heavy-Duty Vehicles § 86.001-25 Maintenance. Section 86.001-25 includes text... engines. (2) Maintenance performed on vehicles, engines, subsystems, or components used to...

  17. 40 CFR 86.004-25 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Maintenance. 86.004-25 Section 86.004...-Fueled and Methanol-Fueled Heavy-Duty Vehicles § 86.004-25 Maintenance. Section 86.004-25 includes text...) Maintenance performed on vehicles, engines, subsystems, or components used to determine exhaust,...

  18. 23 CFR 1.27 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 1.27 Section 1.27 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GENERAL MANAGEMENT AND ADMINISTRATION GENERAL § 1.27 Maintenance... maintenance of projects shall be carried out in accordance with policies and procedures issued by...

  19. 50 CFR 80.17 - Maintenance.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Maintenance. 80.17 Section 80.17 Wildlife... WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS § 80.17 Maintenance. The State is responsible for maintenance of all capital improvements acquired or constructed with Wildlife and Sport...

  20. 41 CFR 101-39.303 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Maintenance. 101-39.303... Maintenance. In order to ensure uninterrupted operation of GSA Interagency Fleet Management System (IFMS) vehicles, safety and preventive maintenance inspections will be performed at regularly scheduled...

  1. 49 CFR 232.611 - Periodic maintenance.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Periodic maintenance. 232.611 Section 232.611 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... maintenance. (a) In addition to the maintenance requirements contained in § 232.303(b) through (d), a...

  2. 47 CFR 80.96 - Maintenance tests.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Maintenance tests. 80.96 Section 80.96... MARITIME SERVICES Operating Requirements and Procedures Operating Procedures-General § 80.96 Maintenance tests. Stations are authorized to engage in test transmissions necessary for maintenance of the...

  3. 49 CFR 195.420 - Valve maintenance.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve maintenance. 195.420 Section 195.420 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY... PIPELINE Operation and Maintenance § 195.420 Valve maintenance. (a) Each operator shall maintain each...

  4. 47 CFR 87.69 - Maintenance tests.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Maintenance tests. 87.69 Section 87.69... Operating Requirements and Procedures Operating Requirements § 87.69 Maintenance tests. The licensee may make routine maintenance tests on equipment other than emergency locator transmitters if there is...

  5. Stochastic reliability and maintenance modeling essays in honor of Professor Shunji Osaki on his 70th birthday

    CERN Document Server

    Nakagawa, Toshio

    2013-01-01

    In honor of the work of Professor Shunji Osaki, Stochastic Reliability and Maintenance Modeling provides a comprehensive study of the legacy of and ongoing research in stochastic reliability and maintenance modeling. Including associated application areas such as dependable computing, performance evaluation, software engineering, communication engineering, distinguished researchers review and build on the contributions over the last four decades by Professor Shunji Osaki. Fundamental yet significant research results are presented and discussed clearly alongside new ideas and topics on stochastic reliability and maintenance modeling to inspire future research. Across 15 chapters readers gain the knowledge and understanding to apply reliability and maintenance theory to computer and communication systems. Stochastic Reliability and Maintenance Modeling is ideal for graduate students and researchers in reliability engineering, and workers, managers and engineers engaged in computer, maintenance and management wo...

  6. Nuclear maintenance work volume model

    International Nuclear Information System (INIS)

    This presentation will cover a work volume model, detailing what contributes to a maintenance backlog and demonstrate the impact of these contributing factors on it's reduction. In our quest to achieve sustainable nuclear excellence, we have engaged in many debates over our degree of success in reducing the maintenance backlog at Ontario Power Generation plants. The backlog is a volume of work and a simplified analogy would be to consider it as the water level in a tank. The inflow would be the new work requests/minor work orders not completed by the Fix It Now Team, and the outflow would be the completed work orders. The equilibrium in the tank would be the result of the incoming rate of new work versus the rate of outgoing completed work. We can accommodate increasing levels for short durations, but our success depends on our ability to manage the process and achieving timely long term reduction in backlog. Although everyone seemed to have an understanding for the type of change required, it was difficult to quantify the optimum combination. Increasing the work force always seems to be an obvious choice, along with productivity improvements but there must be careful consideration given to the preventative maintenance program and resource allocation such as Support Staff, Fix It Now Team, Outages, Projects, etc. Various other factors impacting on our work rates would include training loads, sick leave and overtime. A need was identified for some analytical tool that would illustrate if our goals were attainable with our present course of action, and demonstrate what changes needed to be implemented in order to be successful. We developed a model consisting of an Excel spreadsheet that trends the backlog for each maintenance workgroup. The user populates the model with specific historical data for plant resource profiles and work execution. The program generates two sets of charts for each maintenance groups, one for actual data and another for target data. The

  7. Administrative building

    OpenAIRE

    Vokatá, Kateřina

    2015-01-01

    The task of my master´s thesis was to work up a project and a check of a bearing steel construction the multi-storey office building with a garage in Brno. The building is composed of five storey office section and two storey of garage. Ground dimension of administrative part is 38,8m x 35m with distance of pillars 7m,6m and 6,4m. The structural height of floor is 3,5m.Garage is designed with dimensions 36m x 24,8m with structural height of floor 3,5m. Distance of pillars is 5,6m, 6,4m and 7,...

  8. Building economics

    DEFF Research Database (Denmark)

    Pedersen, D.O.(red.)

    Publikationen er på engelsk. Den omfatter alle indlæg på det fjerde internationale symposium om byggeøkonomi, der blev arrangeret af SBI for det internationale byggeforskningsråd CIB. De fem bind omhandler: Methods of Economic Evaluation, Design Optimization, Ressource Utilization, The Building...... Market og Economics and Technological Forecasting in Construction. Et indledende bind bringer statusrapporter for de fem forskningsområder, og det sidste bind sammenfatter debatten på symposiet....

  9. Model Building

    OpenAIRE

    Frampton, Paul H.

    1997-01-01

    In this talk I begin with some general discussion of model building in particle theory, emphasizing the need for motivation and testability. Three illustrative examples are then described. The first is the Left-Right model which provides an explanation for the chirality of quarks and leptons. The second is the 331-model which offers a first step to understanding the three generations of quarks and leptons. Third and last is the SU(15) model which can accommodate the light leptoquarks possibly...

  10. Building Inclusion

    OpenAIRE

    Jeanet Kullberg; Isik Kulu-Glasgow

    2009-01-01

    The social inclusion of immigrants and ethnic minorities is a central issue in many European countries. Governments face challenges in ensuring housing for immigrants, delivering public services, promoting neighbourhood coexistence and addressing residential segregation. The Building Inclusion project, sponsored by the European Commission, enables EU member states to exchange experiences relating to the social inclusion of vulnerable groups. Its special focus is on housing access and housing ...

  11. 14 CFR 91.1433 - CAMP: Maintenance and preventive maintenance training program.

    Science.gov (United States)

    2010-01-01

    ... maintenance training program. Each program manager who maintains program aircraft under a CAMP or a person performing maintenance or preventive maintenance functions for it must have a training program to ensure that... maintenance training program. 91.1433 Section 91.1433 Aeronautics and Space FEDERAL AVIATION...

  12. 75 FR 37457 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-06-29

    ... URBAN DEVELOPMENT Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of... adopt prevailing wage rates for maintenance laborers and mechanics, and to approve or refer to the U.S... Lists the Following Information Title of Proposal: Maintenance Wage Rate Wage Recommendation...

  13. 75 FR 4099 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-01-26

    ... URBAN DEVELOPMENT Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of... adopt prevailing wage rates for maintenance laborers and mechanics, and to approve or refer to the U.S... lists the following information: Title of Proposal: Maintenance Wage Rate Wage Recommendation...

  14. Evaluation of maintenance strategies of technical systems

    International Nuclear Information System (INIS)

    This paper describes an approach to evaluate and improve the effectiveness of the maintenance strategies of technical systems in operating plants. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of preventive action programs. The application of maintenance analysis in the reliability centred maintenance R and D project for the Barsebaeck nuclear power plant is referred here from the methodological point of view. In order to limit the analysis resources, a decision analytic method for screening of significant objects for maintenance analysis is needed. For the selected analysis significant objects, indicators on operability, and maintenance and testing effectiveness, are calculated. The maintenance history and planning data in the plant maintenance information system is used as input for the calculations. Selection of the items for detailed maintenance analysis from the analysis significant objects is based on deviating signals from the maintenance indicators. Their underlying data on failures and maintenance is studied in a systematic and detailed way. Justified changes in the maintenance action programs are then proposed to improve the operability of the maintenance critical items or the effectiveness in the use of resources. To facilitate generation of the maintenance indicators, and make the maintenance analysis more efficient, powerful and suitable data treatment and presentation tools are needed for analysis of the work order history. In a number of maintenance decisions, additional and conflicting criteria and even non-measurable objectives must be taken into account. Then a more formal decision analysis is useful for selection of the best solution. A tailored decision support procedure helps to clarify and justify the difficult decisions on e.g. replacement of components, investments in condition monitoring, or changes in designs or operability testing programs (author) (ml)

  15. Developing Reliability Based Maintenance Software for Enhancing Maintenance Performance and Aging Management

    International Nuclear Information System (INIS)

    The software of Reliability based Maintenance had been developed for maintenance and ageing maintenance purposes. The program generates information on component boundary, specification, manufacture, maintenance history, failure data, availability and degradation or ageing trend of research reactor components for use of maintenance manager for evaluating. The program was established by analyzing an existing system and designing a system that could enhance the effectiveness of the maintenance. As reference of evaluation, the program was equipped with calculation of failure rate, MTTF, MTTR, FMEA, and Root cause analysis. By using this program technician and manager could easily know status of component weather they suffer from frequent failure or degradation tendency and recommend preventive maintenance. (author)

  16. Optimization of flask maintenance a french experience

    Energy Technology Data Exchange (ETDEWEB)

    Hartenstein, M.; Andreosso, S. [MMT, 78 - Saint-Quentin-en-Yvelines (France)

    1998-12-31

    At any time during operation, transport flasks for radioactive material must remain as safe as they were designed to be. Beyond safety, the maintenance must assure at lowest cost that the flasks stay available and operable without any problem. An optimization is therefore necessary in order to reconcile these constraints. This paper describes the steps taken by the maintenance company MMT so that experience acquired translates into optimizing the maintenance policy, upgrading maintenance techniques, shortening down-times, decreasing personal exposure doses, and also into upgrading the design and operability of existing and future flasks. It concludes that cooperation between the maintenance company and the designer is essential for optimization. (authors)

  17. Optimization of flask maintenance a french experience

    International Nuclear Information System (INIS)

    At any time during operation, transport flasks for radioactive material must remain as safe as they were designed to be. Beyond safety, the maintenance must assure at lowest cost that the flasks stay available and operable without any problem. An optimization is therefore necessary in order to reconcile these constraints. This paper describes the steps taken by the maintenance company MMT so that experience acquired translates into optimizing the maintenance policy, upgrading maintenance techniques, shortening down-times, decreasing personal exposure doses, and also into upgrading the design and operability of existing and future flasks. It concludes that cooperation between the maintenance company and the designer is essential for optimization. (authors)

  18. Circuit breaker maintenance, sentinels on guard

    Energy Technology Data Exchange (ETDEWEB)

    Tanguay, F.

    2003-07-01

    Circuit breakers are essential components of every type and size of power system, and their maintenance is a matter of prime importance. This article provides a list of typical circuit breaker maintenance routines for each type of insulating medium and each type of breaker mechanism, and offers a number of useful tips to ensure the success of a circuit breaker maintenance program. It also suggests sources of information about maintenance programs for circuit breakers such as the National Electrical Testing Association's Maintenance Specifications, and companies that specialize in this type of service. 3 tabs.

  19. Principles of MONJU maintenance. Ageing phenomena of FBR for maintenance

    International Nuclear Information System (INIS)

    Because a fast breeder reactor (FBR) uses sodium as a coolant and there exist systems and components unique to FBR, aging phenomena to be considered in FBR are quite different from ones in a light water reactor (LWR). Therefore it is required to make a maintenance plan for FBR by considering the characteristics of FBR. In the Japanese LWRs, aging phenomena which occur in every part of all safety-related components have been extracted based on the O and M experiences and the technical evaluation on aging phenomena. In this study, aging phenomena or degradation mechanism which may occur in FBR was extracted based on the O and M experiences in the Japanese FBRs including the experiences of the overseas FBRs by using the three step method that is similar to one used in the Japanese LWRs. This paper reports the results of the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM), which consists of engineers from the electric utilities having LWRs, engineers from the plant vendors, and experienced people from the academic circles. (author)

  20. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  1. Preventive maintenance activities for nuclear power station

    International Nuclear Information System (INIS)

    The supply of stable electric power by getting rid of the failures of nuclear power plants is an important factor for obtaining reliance and social acceptance for nuclear power plants as power sources. Electric power companies have improved their installations as well as carried out maintenance during operation, regular inspection and arrangement. Nuclear plant manufacturers not only implement maintenance and facility-improving works at the request of electric power companies, but also have charge of cooperation in maintenance planning, maintenance engineering services such as operation and repair data analysis and the development of working robots for maintenance. This paper introduces the maintenance activities presently performed by Hitachi Ltd., that is (1) servicing activities for supporting maintenance centering around the Nuclear Plant Service Center; (2) maintenance works in regular inspection; (3) maintenance engineering services to offer preventive maintenance data; and (4) the automation of maintenance works and the development of working robots for reducing exposure to radiation. The robots for nuclear plants are roughly divided into the following four types, and the results of using robots are described. They are exchange machines for replacing reactor or auxiliary components; inspection machines for monitoring plant conditions during reactor operation and for inspection works during shutdown; decontamination machines for reducing radiation dose of reactor equipment; and machining robots for reactor equipment reconstruction or repairing works. (Wakatsuki, Y.)

  2. Susquehanna SES maintenance supervisor training and certification

    International Nuclear Information System (INIS)

    Susquehanna's program targets all Supervisors, Supervisor Candidates, and Temporary Supervisors that are responsible for in-plant maintenance or maintenance support activities, including: mechanical maintenance; electrical maintenance; maintenance support (labor support, radwaste, etc.); mobile construction support (mechanical and electrical); chemistry; health physics; maintenance planning; and instrument and controls. The program integrates the three major areas of direct Supervisory responsibilities: (1) Leadership and Management - Skills that require interpersonal activities that are typically humanistic and subjective; such as coaching, motivating, communications, etc. (2) Technical and Administrative - Knowledge that is directly related to the job of Supervising from the production, regulatory, accountability perspective. These topics are very objective and include training on topics such as workpackages, plant chemistry parameters, radiological concerns, etc. (3) Technical Skills - Ensure each Supervisor is technically competent in the plant systems, components, or equipment he/she is tasked with maintaining or overseeing. Typical skills found in this area are, circuit breaker maintenance, primary system sampling, or overhauling pumps

  3. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  4. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  5. The Method of Mission Oriented Maintenance

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    In a real application, equipment in good condition sometimes have to be repairedbecause the equipment does not satisfy the requirements of the mission; However, it is notnecessary to repair some equipment with failures because the failures do not affect the mission completion. In these cases, maintenance activity guided by present maintenance methodsmay sometimes affect the mission completion in time or bring about extra maintenance. To overcome the shortage of present maintenance methods, we propose an idea and method of missionoriented maintenance (MOM) to deal with the maintenance policy on these kinds of problems. This method can work out different maintenance policies corresponding to differentmissions with full consideration of missions and mission requirements for the equipment.

  6. AN OPTIMAL BLOCK PREVENTIVE MAINTENANCE POLICY FOR A MULTI-UNIT SYSTEM CONSIDERING IMPERFECT MAINTENANCE

    OpenAIRE

    Park, J. H.; Lee, S. C.; J. W. HONG; C. H. LIE

    2009-01-01

    A block preventive maintenance (PM) policy for a multi-unit system composed of identical units is investigated in this paper. The block PM model of this paper considers periodic inspection and periodic imperfect maintenance. The imperfect maintenance effects are formulated using improvement factor and age reduction model. We define variables of maintenance policy as the inspection period and the PM period and obtain an optimal maintenance policy which minimizes the average total cost. A numer...

  7. Management and maintenance of life saving masks and bicycles for use below groud

    CERN Multimedia

    TS Department

    2008-01-01

    As of 1st February 2008, the management and maintenance of life saving masks and bikes used in the tunnel will be grouped together under the central stores, you can make enquiries at the emergencies desk in Building 73, or call 73902.

  8. Smart Buildings: Business Case and Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ehrlich, Paul; Diamond, Rick

    2009-04-01

    General Services Administration (GSA) has been a pioneer in using Smart Building technologies but it has yet to achieve the full benefits of an integrated, enterprise-wide Smart Building strategy. In July 2008, GSA developed an initial briefing memorandum that identified five actions for a Smart Buildings feasibility study: (1) Identify and cluster the major building systems under consideration for a Smart Buildings initiative; (2) Identify GSA priorities for these clusters; (3) Plan for future adoption of Smart Building strategies by identifying compatible hardware; (4) Develop a framework for implementing and testing Smart Building strategies and converged networks; and (5) Document relevant GSA and industry initiatives in this arena. Based on this briefing memorandum, PBS and FAS retained consultants from Lawrence Berkeley National Laboratory, Noblis, and the Building Intelligence Group to evaluate the potential for Smart Buildings within GSA, and to develop this report. The project has included extensive interviews with GSA staff (See Appendix A), a review of existing GSA standards and documents, and an examination of relevant GSA and industry initiatives. Based on interviews with GSA staff and a review of GSA standards and documents, the project team focused on four goals for evaluating how Smart Building technology can benefit GSA: (1) Achieve Energy Efficiency Mandates--Use Smart Building technology as a tool to meet EISA 2007 and EO 13423 goals for energy efficiency. (2) Enhance Property Management--Deploy enterprise tools for improved Operations and Maintenance (O&M) performance and verification. (3) Implement Network as the Fourth Utility--Utilize a converged broadband network to support Smart Building systems and provide GSA clients with connectivity for voice, data and video. (4) Enhance Safety and Security--Harmonize Physical Access Control Systems (PACS) with Smart Building Systems.

  9. A glue for heterochromatin maintenance

    OpenAIRE

    Krouwels, Ilke M.; Wiesmeijer, Karien; Abraham, Tsion E.; Molenaar, Chris; Verwoerd, Nico P.; Tanke, Hans J; Dirks, Roeland W.

    2005-01-01

    Trimethylation of histone H3 lysine 9 and the subsequent binding of heterochromatin protein 1 (HP1) mediate the formation and maintenance of pericentromeric heterochromatin. Trimethylation of H3K9 is governed by the histone methyltransferase SUV39H1. Recent studies of HP1 dynamics revealed that HP1 is not a stable component of heterochromatin but is highly mobile (Cheutin, T., A.J. McNairn, T. Jenuwein, D.M. Gilbert, P.B. Singh, and T. Misteli. 2003. Science. 299:721–725; Festenstein, R., S.N...

  10. Proactive maintenance for mechanical systems

    CERN Document Server

    Fitch, EC

    1992-01-01

    Written by Dr. E.C. Fitch, the book contains over 340 double column pages which include 400 figures and tables, a comprehensive bibliography, and index. There is no root cause of mechanical failure, known to the author, that has been ignored or left out. Nowhere in the world is this information put together in such a concise and comprehensive manner, and the book will serve as a reference and guide to designers, practising engineers, maintenance technicians, plant managers and operators who must design, maintain and operate fluid-dependent mechanical systems.

  11. Coastal maintenance in the Netherlands

    OpenAIRE

    Verhagen, H.J.

    1991-01-01

    The government of The Netherlands has decided in the summer of 1990 to maintai.n the coastline at the position of 1990. This will be done mainly by artificial beach nourishment. The costs will be paid by the national government. The purpose of this coastal maintenance is to maintain a sufficient level of safety and to maintain the various functions of beach and dune areas. As a criterion for coastal erosion the movement of the "coastline" is used. In this paper the definition of coastline is ...

  12. Ontology Maintenance using Textual Analysis

    Directory of Open Access Journals (Sweden)

    Yassine Gargouri

    2003-10-01

    Full Text Available Ontologies are continuously confronted to evolution problem. Due to the complexity of the changes to be made, a maintenance process, at least a semi-automatic one, is more and more necessary to facilitate this task and to ensure its reliability. In this paper, we propose a maintenance ontology model for a domain, whose originality is to be language independent and based on a sequence of text processing in order to extract highly related terms from corpus. Initially, we deploy the document classification technique using GRAMEXCO to generate classes of texts segments having a similar information type and identify their shared lexicon, agreed as highly related to a unique topic. This technique allows a first general and robust exploration of the corpus. Further, we apply the Latent Semantic Indexing method to extract from this shared lexicon, the most associated terms that has to be seriously considered by an expert to eventually confirm their relevance and thus updating the current ontology. Finally, we show how the complementarity between these two techniques, based on cognitive foundation, constitutes a powerful refinement process.

  13. Maintenance technologies on nuclear power plants

    International Nuclear Information System (INIS)

    As nuclear power plants in Japan are proud of their operation results with high reliability at a viewpoint of the world, one of main factors supporting on this high reliability is 'maintenance'. On the other hand, U.S.A. has not carried out thorough preventive maintenance like Japan but systematically progressed adequacy of maintenance at a center of condition based maintenance (CBM) under its success. In Japan, reduction of periodical inspection time and introduction of the CBM are begun to wrestle with adequacy of maintenance. Here was introduced on efforts on maintenance, inspection and technical development carried out at the nuclear power plants, and also on actions on 'maintenance' in Japan. Here were described on present state of maintenance and inspection in the nuclear power stations, efforts to reduce periodical inspection time, efforts on countermeasure for high aging, conditions on technical development of maintenance and inspection, working results on renewal engineering of large scale apparatuses, and efforts on upgrading of technology on maintenance and inspection. (G.K.)

  14. 222-S Laboratory maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Heinemann, J.L.

    1997-08-13

    This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance Implementation Plan provides the interface requirements and responsibilities as they apply specifically to 222-S Laboratory. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion section as applied to 222-S Laboratory implementation has been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to keep this document current and in compliance with DOE requirements.

  15. 7 CFR 1767.27 - Operation and maintenance expenses.

    Science.gov (United States)

    2010-01-01

    ... 569Maintenance of Structures 569.1Maintenance of Computer Hardware 569.2Maintenance of Computer Software 569....3Maintenance of Computer Software 576.4Maintenance of Communication Equipment 576.5Maintenance of Miscellaneous.... Research, development, and demonstration expenses. 507Rents This account shall include all rents...

  16. Dynamic grouping maintenance strategy with time limited opportunities

    OpenAIRE

    Do Van, Phuc; Florent, Brissaud; Keomany, Bouvard; Barros, Anne; Berenguer, Christophe

    2011-01-01

    This paper presents a dynamic grouping maintenance strategy for multi-component systems with positive economic dependence, which implies that combining maintenance activities is cheaper than performing maintenance on components separately. Preventive maintenance durations and occurrences of maintenance activities within the scheduling horizon are considered. Moreover, in presence of opportunities with limited durations in which some maintenance activities could be executed with reduced mainte...

  17. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from most of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR

  18. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    F. Habashi

    2000-06-22

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from most of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR

  19. Factsheet on Energy Neutral School Buildings and Office Buildings; Infoblad Energieneutrale scholen en kantoren

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-15

    A brief overview is given of all aspects of energy-neutral building and renovating school and office buildings. Besides technique, also attention is given to process, financing, management and maintenance. This factsheet is part of a series of three factsheets on energy neutral construction of houses and buildings. The other two are: 'Factsheet on Energy Neutral Building : Definition and ambition' and 'Factsheet on Energy Neutral Building' [Dutch] Een kort overzicht wordt gegeven van alle aspecten van energieneutraal bouwen en renoveren van woningen. Naast techniek komen ook proces, financiering en beheer en onderhoud aan de orde. Dit Infoblad maakt deel uit van een serie van drie Infobladen over energieneutraal bouwen voor woningen en gebouwen. De andere twee zijn: 'Infoblad Energieneutraal bouwen: definitie en ambitie' en 'Infoblad Energieneutrale Woningbouw'.

  20. Existing buildings

    DEFF Research Database (Denmark)

    Gram-Hanssen, Kirsten

    2014-01-01

    their homes. These policy measures include building regulations, energy tax and different types of incentives and information dissemination. The conclusion calls for new and innovative policy measures to cope with the realities of renovations of owner-occupied houses and how energy efficiency......This paper deals with the energy consumption of existing owner-occupied detached houses and the question of how they can be energy renovated. Data on the age of the Danish housing stock, and its energy consumption is presented. Research on the potential for energy reductions in the Danish housing...... sector is discussed, and it is shown that there is a huge potential for reductions. It is a well-known problem that even if there are relevant technical means and even if it is economically feasible, the majority of house owners do not energy renovate their homes. This paper intends to address what can...

  1. Durability of building materials and components

    CERN Document Server

    Delgado, JMPQ

    2013-01-01

    Durability of Building Materials and Components provides a collection of recent research works to contribute to the systematization and dissemination of knowledge related to the long-term performance and durability of construction and, simultaneously, to show the most recent advances in this domain. It includes a set of new developments in the field of durability, service life prediction methodologies, the durability approach for historical and old buildings, asset and maintenance management and on the durability of materials, systems and components. The book is divided in several chapters that intend to be a resume of the current state of knowledge for benefit of professional colleagues.

  2. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  3. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  4. Reliability centered maintenance mini-seminar

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Simola, K. (eds.) [VTT Automation, Espoo (Finland)

    2000-10-01

    In the Earlier NKS-project RAK-1 (1994-1997), the sub-project RAK-1.4, 'Maintenance Strategies and Ageing' focused on development of methodologies and tools for improving maintenance strategies. In the NKS/SOS-2 project (1998-2001), the maintenance related Nordic co-operation is continued. For exchange of information and as background and for discussions related to maintenance decisions in the NKS/SOS-2 project, a mini-seminar on maintenance strategies with an emphasis on reliability centred maintenance (RCM) approaches was arranged 14.10.1999. The report summarises the topics of the presentations and discussions at the seminar. The transparencies presented at the mini-seminar are enclosed in this report. (au)

  5. Reliability centered maintenance mini-seminar

    International Nuclear Information System (INIS)

    In the Earlier NKS-project RAK-1 (1994-1997), the sub-project RAK-1.4, 'Maintenance Strategies and Ageing' focused on development of methodologies and tools for improving maintenance strategies. In the NKS/SOS-2 project (1998-2001), the maintenance related Nordic co-operation is continued. For exchange of information and as background and for discussions related to maintenance decisions in the NKS/SOS-2 project, a mini-seminar on maintenance strategies with an emphasis on reliability centred maintenance (RCM) approaches was arranged 14.10.1999. The report summarises the topics of the presentations and discussions at the seminar. The transparencies presented at the mini-seminar are enclosed in this report. (au)

  6. Integrating Responsive Building Elements in Buildings

    DEFF Research Database (Denmark)

    Haase, Matthias; Amato, Alex; Heiselberg, Per

    2006-01-01

    There is a global need for a more sustainable building development. About 50% of energy is used in buildings indicating that buildings provide a considerable potential for operational energy savings. Studies were conducted with the following objectives: to perform a state-of-the-art review of...... responsive building elements, of integrated building concepts and of environmental performance assessment methods to improve and optimize responsive building elements to develop and optimize new building concepts with integration of responsive building elements, HVAC-systems as well as natural and renewable...... energy strategies to develop guidelines and procedures for estimation of environmental performance of responsive building elements and integrated building concepts This paper introduces the ideas of this collaborative work and discusses its usefulness for Hong Kong and China. Special focus was put on the...

  7. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  8. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  9. Trends and Perspective in Industrial Maintenance Management

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    increased attention. Trends and perspective in industrial maintenance are presented. The result of benchmarking studies from Scandinavia and United States are also presented and compared. Case studies that examine maintenance methods, knowledge, organization and information systems in three Danish......With increased global competition for manufacturing, many companies are seeking ways to gain competitative advanges with respect to cost, service, quality and on-time deliveries. The role that effective maintenance management plays in contributing to overall organizational productivity has received...

  10. Information support for road infrastructure and maintenance

    OpenAIRE

    Ojsteršek, Aleš

    2008-01-01

    The final thesis deals with the usage of information support models in the process of construction and maintenance of the publicly owned roads. The first part of the thesis is dedicated to the management of the road infrastructure; special attention is paid to the process of construction, renewal, and maintenance of roads, as well as to the pertaining legislation. In the following chapters the current progress in construction, renewal and maintenance of roads, as well as the process of monito...

  11. Estimating Maintenance Demands Of A Space Station

    Science.gov (United States)

    Bream, B. L.

    1995-01-01

    RENEW computer program simulates maintenance events and estimates data pertinent to maintenance demands. Developed in support of Space Station Freedom Program (SSFP) Work Package 4. Uses data on reliability and maintainability (R&M) as well as logistical data to estimate both average and time-dependent maintenance demands. Estimates failure and repair times by use of Monte Carlo simulations. Written in BASIC and Assembly language.

  12. Trends and Perspective in Industrial Maintenance Management

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    With increased global competition for manufacturing, many companies are seeking ways to gain competitative advanges with respect to cost, service, quality and on-time deliveries. The role that effective maintenance management plays in contributing to overall organizational productivity has received...... increased attention. Trends and perspective in industrial maintenance are presented. The result of benchmarking studies from Scandinavia and United States are also presented and compared. Case studies that examine maintenance methods, knowledge, organization and information systems in three Danish...

  13. Machinery prognostics and prognosis oriented maintenance management

    CERN Document Server

    Yan, Jihong

    2014-01-01

    This book gives a complete presentatin of the basic essentials of machinery prognostics and prognosis oriented maintenance management, and takes a look at the cutting-edge discipline of intelligent failure prognosis technologies for condition-based maintenance.  Latest research results and application methods are introduced for signal processing, reliability moelling, deterioration evaluation, residual life prediction and maintenance-optimization as well as applications of these methods.

  14. Optimisation of Wheelset Maintenance: Current Research Activities

    OpenAIRE

    Bevan, Adam; Molyneux-Berry, Paul

    2014-01-01

    Recent research projects relating to wheelset damage and maintenance practices includes: - Influence of changes in material properties on observed damage - Optimisation of wheelset maintenance to reduce whole-system costs - Investigating the influence of route and vehicle design and maintenance policy on wheel tread damage - Assessment of alternative wheel profiles, considering both whole-system costs and running safety - Categorisation of wheel damage mechanisms to im...

  15. Distributed Maintenance Error Information, Investigation and Intervention

    OpenAIRE

    Zolla, George; Boex, Tony; Flanders, Pat; Nelson, Doug; Tufts, Scott; Schmidt, John K.

    2001-01-01

    This paper describes a safety information management system designed to capture maintenance factors that contribute to aircraft mishaps. The Human Factors Analysis and Classification System-Maintenance Extension taxonomy (HFACS-ME), an effective framework for classifying and analyzing the presence of maintenance errors that lead to mishaps, incidents, and personal injuries, is the theoretical foundation. An existing desktop mishap application is updated, a prototype we...

  16. Improving maintenance strategies from experience feedback

    OpenAIRE

    Potes Ruiz, Paula Andrea; Kamsu-Foguem, Bernard; Grabot, Bernard

    2013-01-01

    A huge amount of rough data is available in companies on past maintenance activities as a result of the implementation of CMMS (Computerized Maintenance Management System). In that context, we focus on an experience feedback system dedicated to maintenance, allowing the capitalization of past interventions by means of a formal knowledge representation language, and the extraction from these interventions of new knowledge for future reuse.

  17. Software Maintenance Management Evaluation and Continuous Improvement

    CERN Document Server

    April, Alain

    2008-01-01

    This book explores the domain of software maintenance management and provides road maps for improving software maintenance organizations. It describes full maintenance maturity models organized by levels 1, 2, and 3, which allow for benchmarking and continuous improvement paths. Goals for each key practice area are also provided, and the model presented is fully aligned with the architecture and framework of software development maturity models of CMMI and ISO 15504. It is complete with case studies, figures, tables, and graphs.

  18. Simulated maintenance a virtual reality

    International Nuclear Information System (INIS)

    The article describes potential applications of personal computer-based virtual reality software. The applications are being investigated by Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories for the Canadian deuterium-uranium (Candu) reactor. Objectives include: (1) reduction of outage duration and improved safety, (2) cost-effective and safe maintenance of equipment, (3) reduction of exposure times and identification of overexposure situations, (4) cost-effective training in a virtual control room simulator, (5) human factors evaluation of design interface, and (6) visualization of conceptual and detailed designs of critical nuclear field environments. A demonstration model of a typical reactor control room, the use of virtual reality in outage planning, and safety issues are outlined

  19. The divertor remote maintenance project

    International Nuclear Information System (INIS)

    Remote replacement of the ITER divertor will be required several times during the life of ITER. To facilitate its regular exchange, the divertor is assembled in the ITER vacuum vessel from 60 cassettes. Radial movers transport each cassette along radial rails through the handling ports and into the vessel where a toroidal mover lifts and transports the cassette around a pair of toroidal rails. Once at its final position the cassette is locked to the toroidal rails and is accurately aligned in both poloidal and toroidal directions. A further requirement on the divertor is to minimise the amount of activated waste to be sent to a repository. To this end the cassettes have been designed to allow the remote replacement, in a hot cell, of their plasma facing components. The paper describes the two facilities built at ENEA Brasimone, Italy, whose aim is to demonstrate the reliable remote maintenance of the divertor cassettes. (author)

  20. Guidebook for maintenance proficiency testing

    International Nuclear Information System (INIS)

    This guidebook is designed to be a workbook for the construction of proficiency tests for maintenance personnel in nuclear power plants. Step-by-step details are provided for the definition of organizational needs -- who should be tested, on which tasks; decisions about test format -- what the test should look like; and calculations of costs and benefits. The primary focus is on the construction of proficiency tests, in particular, written tests of job knowledge and performance tests of job skills. Examples from test-construction activities at two nuclear power plants illustrate the general principles and practical details. Refinement and validation of the tests are discussed thoroughly, and issues and problems that arise in developing and administering a testing program are reviewed. 17 refs., 30 figs., 30 tabs

  1. Comparing Maintenance Strategies for Overlays

    CERN Document Server

    Krishnamurthy, Supriya; Aurell, Erik; Haridi, Seif

    2007-01-01

    In this paper, we present an analytical tool for understanding the performance of structured overlay networks under churn based on the master-equation approach of physics. We motivate and derive an equation for the average number of hops taken by lookups during churn, for the Chord network. We analyse this equation in detail to understand the behaviour with and without churn. We then use this understanding to predict how lookups will scale for varying peer population as well as varying the sizes of the routing tables. We then consider a change in the maintenance algorithm of the overlay, from periodic stabilisation to a reactive one which corrects fingers only when a change is detected. We generalise our earlier analysis to underdstand how the reactive strategy compares with the periodic one.

  2. Advantages of condition-based maintenance approach

    International Nuclear Information System (INIS)

    Pilot applications in EnBW steam boiler components and high-pressure pipe systems in the context of the European research project RIMAP (''Risk Based Inspection and Maintenance Procedures for European Industry'') showed that application of a risk-based maintenance strategy (e.g. RIMAP) will make the decision process more transparent and enable better condition-oriented maintenance. With regard to life management of the systems (availability, product quality), this appears to be more important than than the aspect of cost reduction in the maintenance sector, although the latter may not be unwelcome. (orig.)

  3. Remote maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Remote maintenance techniques applied in large-scale nuclear fuel reprocessing plants are reviewed with particular attention to the three major maintenance philosophy groupings: contact, remote crane canyon, and remote/contact. Examples are given, and the relative success of each type is discussed. Probable future directions for large-scale reprocessing plant maintenance are described along with advanced manipulation systems for application in the plants. The remote maintenance development program within the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is also described. 19 refs., 19 figs

  4. Remote maintenance technology in nuclear facilities

    International Nuclear Information System (INIS)

    In the nuclear facilities in Japan, it is generally required to engineer all the process equipment to permit easy, safe and efficient maintenance while such equipment is operated by remote control within the plant. As typical maintenance machine, there are tow-arm manipulators, power manipulators, and in-cell cranes. It is also important that such manipulator could be repaired and maintained by remote maintenance. For this purpose, all the core items of the manipulator could be separated into several modules by design. Our system has piled up experience and practical achievements for many years and it has been gained a reputation for high reliability of the remote maintenance technology. (author)

  5. A Predictive Maintenance Model for Railway Tracks

    DEFF Research Database (Denmark)

    Li, Rui; Wen, Min; Salling, Kim Bang;

    2015-01-01

    For the modern railways, maintenance is critical for ensuring safety, train punctuality and overall capacity utilization. The cost of railway maintenance in Europe is high, on average between 30,000 – 100,000 Euro per km per year [1]. Aiming to reduce such maintenance expenditure, this paper...... recovery on the track quality after tamping operation and (5) Tamping machine operation factors. A Danish railway track between Odense and Fredericia with 57.2 km of length is applied for a time period of two to four years in the proposed maintenance model. The total cost can be reduced with up to 50...

  6. Conceptualization of an intellectual maintenance management system

    International Nuclear Information System (INIS)

    It is studied in many research institute to enhance availability and safety of nuclear power plants operation and maintenance. On this account, development of autonomous plants has been carried out to replace the role of operators with artificial intelligence and autonomous robots. We have been developing an intellectual maintenance management system since 1994. As the first step, concept of an intellectual maintenance management system was constructed. The intellectual maintenance managerial system is in charge of maintenance function of an autonomous plant. The intellectual maintenance managerial system has three functions which is monitoring state and judging abnormal machine and deciding maintenance plan by autonomy. This system has an important role of indication and communication of the result to an autonomous operation system and autonomous robot. In this examination, we adopted the distributed and cooperative system technique by multi-agent of AI technology and examined a method to enforce problem solving by cooperation of sensor and actuator. In this report, we examined trouble detection and troubleshooting evaluation and maintenance plan decision function by the distributed and cooperative system technology, the distributed and cooperative system communication-function that these information releases functions was taken on. In conceptualization of the intellectual maintenance managerial system, we clarified of major functions to constitute this system and relation between autonomous operation system and autonomous robots. We clarified the information exchange scheme between this system and an outside system furthermore. In future, we will prototype each function and inspect the total system. (author)

  7. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis. PMID:27066680

  8. MOV predictive maintenance program at Darlington NGS

    International Nuclear Information System (INIS)

    This paper details the Motor Operated Valve (MOV) Predictive Maintenance program at Darlington Nuclear Generating Station. The program encompasses the use of diagnostics tooling in conjunction with more standard maintenance techniques, with the goal of improving performance of MOV's. Problems encountered and solutions developed during the first two phases of this program are presented, along with proposed actions for the final trending phase of the program. This paper also touches on the preventive and corrective maintenance aspects of an overall MOV maintenance program. 6 refs., 6 tabs., 6 figs

  9. Task oriented evaluation system for maintenance robots

    International Nuclear Information System (INIS)

    The adaptability evaluation of maintenance robots to autonomous plants has been discussed. In this paper, a new concept of autonomous plant with maintenance robots are introduced, and a framework of autonomous maintenance system is proposed. Then, task-oriented evaluation of robot arms is discussed for evaluating their adaptability to maintenance tasks, and a new criterion called operability is proposed for adaptability evaluation. The task-oriented evaluation system is implemented and applied to structural design of robot arms. Using genetic algorithm, an optimal structure adaptable to a pump disassembly task is obtained. (author)

  10. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  11. Knowledge elicitation techniques and application to nuclear plant maintenance

    Science.gov (United States)

    Doyle, E. Kevin

    The new millennium has brought with it the opportunity of global trade which in turn requires the utmost in efficiency from each individual industry. This includes the nuclear power industry, a point which was emphasized when the electrical generation industry began to be de regulated across North America the late 1990s and re-emphasized when the northeast power grid of North America collapsed in the summer of 2003. This dissertation deals with reducing the cost of the maintenance function of Candu nuclear power plants and initiating a strong link between universities and the Canadian nuclear industry. Various forms of RCM (reliability-centred maintenance) have been the tools of choice in industry for improving the maintenance function during the last 20 years. In this project, pilot studies, conducted at Bruce Power between 1999 and 2005, and reported on in this dissertation, lay out a path to implement statistical improvements as the next step after RCM in reducing the cost of the maintenance. Elicitation protocols, designed for the age group being elicited, address the much-documented issue of a lack of data. Clear, graphical, inferential statistical interfaces are accentuated and developed to aid in building the teams required to implement the various methodologies and to help in achieving funding targets. Graphical analysis and Crow/AMSAA (army materials systems analysis activity) plots are developed and demonstrated from the point of view of justifying the expenditures of cost reduction efforts. This dissertation ultimately speaks to the great opportunity being presented by this approach at this time: of capturing the baby-boom generation's huge pool of knowledge before those people retire. It is expected that the protocols and procedures referenced here will have applicability across the many disciplines where collecting expert information from a similar age group is required.

  12. Influence of handpiece maintenance sprays on resin bonding to dentin

    Directory of Open Access Journals (Sweden)

    Toyotarou Sugawara

    2010-03-01

    Full Text Available Toyotarou Sugawara1, Atsushi Kameyama2, Akiko Haruyama3, Takumi Oishi4, Nobuyuki Kukidome2, Yasuaki Takase2, Masatake Tsunoda21Undergraduate Student, Tokyo Dental College, Chiba, Japan; 2Division of General Dentistry, Tokyo Dental College Chiba Hospital, Chiba, Japan; 3Department of Dental Materials Science, Tokyo Dental College, Chiba, Japan; 4Department of Dentistry and Oral Surgery, Keio University School of Medicine, Tokyo, JapanObjective: To investigate the influence of maintenance spray on resin bonding to dentin.Materials and methods: The crown of extracted, caries-free human molars was transversally sectioned with a model trimmer to prepare the dentin surfaces from mid-coronal sound dentin, and then uniformly abraded with #600 silicon carbide paper. The dentin surfaces were randomly divided into three groups: oil-free spray group where maintenance cleaner for air bearing handpieces was sprayed onto the dentin surface for 1 s and rinsed with water spray for 30 s; oil-containing spray group where maintenance cleaner for micro motor handpieces was sprayed onto the dentin surface for 1 s and rinsed with water spray for 30 s; and control group where the surface was rinsed with water spray for 30 s and then air-dried. These surfaces were then bonded with Clearfil SE Bond (Kuraray Medical, and resin composite (Clearfil AP-X, Kuraray Medical build-up crowns were incrementally constructed on the bonded surfaces. After storage for 24 h in 37°C water, the bonded teeth were sectioned into hour-glass shaped slices (0.7-mm thick perpendicular to the bonded surfaces. The specimens were then subjected to microtensile bond strength (μTBS testing at a crosshead speed of 1.0 mm/min. Data were analyzed with one-way ANOVA and the Tukey-Kramer test.Results: Maintenance spray-contaminated specimens (oil-free and oil-containing spray groups showed significantly lower μTBS than control specimens (P < 0.05. However, there was no significant difference between

  13. Building energy analysis tool

    Science.gov (United States)

    Brackney, Larry; Parker, Andrew; Long, Nicholas; Metzger, Ian; Dean, Jesse; Lisell, Lars

    2016-04-12

    A building energy analysis system includes a building component library configured to store a plurality of building components, a modeling tool configured to access the building component library and create a building model of a building under analysis using building spatial data and using selected building components of the plurality of building components stored in the building component library, a building analysis engine configured to operate the building model and generate a baseline energy model of the building under analysis and further configured to apply one or more energy conservation measures to the baseline energy model in order to generate one or more corresponding optimized energy models, and a recommendation tool configured to assess the one or more optimized energy models against the baseline energy model and generate recommendations for substitute building components or modifications.

  14. Reliability assessment of power pole infrastructure incorporating deterioration and network maintenance

    International Nuclear Information System (INIS)

    There is considerable investment in timber utility poles worldwide, and there is a need to examine the structural reliability and probability based management optimisation of these power distribution infrastructure elements. The work presented in this paper builds on the existing studies in this area through assessment of both treated and untreated timber power poles, with the effects of deterioration and network maintenance incorporated in the analysis. This more realistic assessment approach, with deterioration and maintenance considered, was achieved using event-based Monte Carlo simulation. The output from the probabilistic model is used to illustrate the importance of considering network maintenance in the time-dependent structural reliability assessment of timber power poles. Under wind load, treated and untreated poles designed and maintained in accordance with existing Australian standards were found to have similar failure rates. However, untreated pole networks required approximately twice as many maintenance based pole replacements to sustain the same level of reliability. The effect of four different network maintenance strategies on infrastructure performance was also investigated herein. This assessment highlighted the fact that slight alterations to network maintenance practices can lead to significant changes in performance of timber power pole networks. - Highlights: • A time-dependent structural reliability model was developed for timber power poles. • Deterioration and network maintenance were incorporated into this event based model. • Network maintenance had a significant impact on power pole wind vulnerability. • Treated and untreated poles designed to Australian standards had similar reliability. • Minor alterations to maintenance strategies had large effects on network performance

  15. Building America

    Energy Technology Data Exchange (ETDEWEB)

    Brad Oberg

    2010-12-31

    Builders generally use a 'spec and purchase' business management system (BMS) when implementing energy efficiency. A BMS is the overall operational and organizational systems and strategies that a builder uses to set up and run its company. This type of BMS treats building performance as a simple technology swap (e.g. a tank water heater to a tankless water heater) and typically compartmentalizes energy efficiency within one or two groups in the organization (e.g. purchasing and construction). While certain tools, such as details, checklists, and scopes of work, can assist builders in managing the quality of the construction of higher performance homes, they do nothing to address the underlying operational strategies and issues related to change management that builders face when they make high performance homes a core part of their mission. To achieve the systems integration necessary for attaining 40% + levels of energy efficiency, while capturing the cost tradeoffs, builders must use a 'systems approach' BMS, rather than a 'spec and purchase' BMS. The following attributes are inherent in a systems approach BMS; they are also generally seen in quality management systems (QMS), such as the National Housing Quality Certification program: Cultural and corporate alignment, Clear intent for quality and performance, Increased collaboration across internal and external teams, Better communication practices and systems, Disciplined approach to quality control, Measurement and verification of performance, Continuous feedback and improvement, and Whole house integrated design and specification.

  16. Geothermal Power Plant Maintenance: Evaluating Maintenance System Needs Using Quantitative Kano Analysis

    OpenAIRE

    Reynir S. Atlason; Gudmundur V. Oddsson; Runar Unnthorsson

    2014-01-01

    A quantitative Kano model is used in this study to identify which features are preferred by top-level maintenance engineers within Icelandic geothermal power plants to be implemented in a maintenance tool or software. Visits were conducted to the largest Icelandic energy companies operating geothermal power plants. Thorough interviews with chiefs of operations and maintenance were used as a basis for a quantitative Kano analysis. Thirty seven percent of all maintenance engineers at Reykjavik ...

  17. Maintenance grouping for multi-component systems with availability constraints and limited maintenance teams

    OpenAIRE

    Do Van, Phuc; Vu, Hai Canh; Barros, Anne; Bérenguer, Christophe

    2015-01-01

    The paper deals with a maintenance grouping approach for multi-component systems whose components are connected in series. The considered systems are required to serve a sequence of missions with limited breaks/stoppage durations while maintenance teams (repairmen) are limited and may vary over time. The optimization of the maintenance grouping decision for such multi-component systems leads to a NP-complete problem. The aim of the paper is to propose and to optimize a dynamic maintenance dec...

  18. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  19. Relationship Maintenance on Facebook: Development of a Measure, Relationship to General Maintenance, and Relationship Satisfaction

    Science.gov (United States)

    Dainton, Marianne

    2013-01-01

    Previous research indicates that the primary reason college students use Facebook is for relationship maintenance. The present study sought to determine the relationship between Facebook maintenance and general maintenance efforts in college student romantic relationships, as well as the impacts of such behaviors on the relationship. Survey data…

  20. 40 CFR 89.109 - Maintenance instructions and minimum allowable maintenance intervals.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Maintenance instructions and minimum allowable maintenance intervals. 89.109 Section 89.109 Protection of Environment ENVIRONMENTAL PROTECTION...-IGNITION ENGINES Emission Standards and Certification Provisions § 89.109 Maintenance instructions...

  1. A Study on Maintenance Management and Maintenance Decision-Making Methods

    Institute of Scientific and Technical Information of China (English)

    ZHAO Song-zheng; XIAO Wei

    2004-01-01

    By comparing the advantages and disadvantages of the main popular maintenance modes,this paper analyses the relationship between maintenance modes, and gives a model of maintenance decision-making. The model can be used in enterprises to minimize life cycle cost (LCC).

  2. Operation and maintenance cost-cutting

    Energy Technology Data Exchange (ETDEWEB)

    Hollingshead, T.W.

    1996-12-31

    This presentation by Timothy W. Hollingshead, Technical Services Manager, Pacific Gas and Electric, is about cutting costs in the Operation and Maintenance phase of geothermal energy production. The necessity of cost control, keeping workers well-trained and avoiding OSHA fines, taking advantages of new technologies, and establishing predictive maintenance programs are some of the issues discussed in this article.

  3. Maintenance implementation plan for solid waste management

    Energy Technology Data Exchange (ETDEWEB)

    Reddinger, R.W., Westinghouse Hanford

    1996-06-27

    This Maintenance Implementation Plan (MIP)was developed for implementation of the U.S. Department of Energy (DOE) Order 4330.4A, A Maintenance Implementation Program (DOE 1990) which has been replaced by 4330.4B (DOE 1994) at the Hanford Site SWM complex. It addresses maintenance functions associated with SWM, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for SWM was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The objective of this MIP is to provide baseline information for the control and execution of SWM Maintenance activities relative to the requirements of Order 4330.4B, Chapter II. (Nuclear Facilities) It also describes actions that are planned to achieve compliance. Section 2.0 of this MIP summarizes the mission, history, and future plans of SWM. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy (both near- term and long-term) for implementing improvements to the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, including objectives of each element, a discussion of how SWM addresses these objectives, proposed improvements, and references to Westinghouse Hanford Company (Westinghouse Hanford) policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 presents the implementation schedule for planned improvements.

  4. Principles of machine operation and maintenance

    CERN Document Server

    Jeffrey, Dick

    2013-01-01

    This book explains how rotating machinery works, and the role of the maintenance engineer in ensuring its proper operation. Stress is laid on the need for the trainee engineer to develop skills in diagnosis and troubleshooting as well as practicalexpertise in maintenance procedures.

  5. Preparing and organizing inspection and maintenance

    International Nuclear Information System (INIS)

    The philosophy and goals of maintenance are discussed. The main principles in organizing the maintenance of the Loviisa power plant are: the people responsible for maintenance during operation are also responsible for maintenance during outages; outside contractors are used for the peak loads during outages but the planning and monitoring of outages is the responsibility of the plant personnel. Technically skilled and highly motivated personnel is the most important prerequisite of success. Loviisa has for several years very successfully utilized two different types of salary bonus system. The reloading outage bonus system gives more money per hour during the outage and an additional increase for all plant people participating in the outage work, if the duration of the outage is shorter than planned. The amount of the extra bonus depends on the final duration of the outage. The operation and maintenance of the Loviisa plant is based on quality assurance, operation and maintenance procedures. The annual and long-term plan of actions are controlled by regular planning meetings which utilize all reports produced by the maintenance groups. The technical outage report contains all technical information gathered during the outages according to the preventive maintenance and in-service inspection programs. The condition monitoring programs of the plant components were developed by the Research Laboratories of Imatran Voima and financed by the plant. (Z.S.) 9 figs., 5 refs

  6. SUPREME SUstainable PREdictive Maintenance for manufacturing Equipment

    OpenAIRE

    Sieg-Zieba, Sophie; Adolf, Thomas; LUCKE, Dominik; Haug, Ralf; Boulet, Pierrick; García-Sedano, Javier

    2014-01-01

    Productivity improvements have major impact on economy and competitiveness in European manufacturing industry. Industrial maintenance contributes largely to this competitiveness through reliability and availability of production equipment. Especially in continuous production industries (energy, chemical, food, cement or paper sectors) the ratio "maintenance costs/added value product" is even higher than 25 %. Defect components or process failures can stop the whole production, therefore predi...

  7. Standardized Curriculum for General Industrial Maintenance Trades.

    Science.gov (United States)

    Mississippi State Dept. of Education, Jackson. Office of Vocational, Technical and Adult Education.

    Standardized vocational education course titles and core contents for two courses in Mississippi are provided: general industrial maintenance trades I and II. The first course contains the following units: (1) orientation and leadership activities; (2) safety; (3) blueprint reading; (4) oxyacetylene cutting; (5) preventative maintenance; (6)…

  8. Maintenance and service of heat pump plants

    Energy Technology Data Exchange (ETDEWEB)

    Diehl, J.; Dirmeier, K.

    1983-02-01

    The utilization of heat pumps for layer plants (from ca. 150 kW upward) which is definitely efficient already today often fails because of insufficient maintenance services offered by the installing firms. The detailed practical information regarding maintenance is not to replace but to complete the service training usually offered by the manufacturers.

  9. 40 CFR 141.33 - Record maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Record maintenance. 141.33 Section 141.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Reporting and Recordkeeping § 141.33 Record maintenance....

  10. 12 CFR 347.210 - Asset maintenance.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Asset maintenance. 347.210 Section 347.210 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY INTERNATIONAL BANKING Foreign Banks § 347.210 Asset maintenance. (a) An insured branch of a foreign bank...

  11. 30 CFR 56.9313 - Roadway maintenance.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Roadway maintenance. 56.9313 Section 56.9313 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... § 56.9313 Roadway maintenance. Water, debris, or spilled material on roadways which creates hazards...

  12. 49 CFR 399.211 - Maintenance.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Maintenance. 399.211 Section 399.211 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY... STANDARDS Step, Handhold, and Deck Requirements for Commercial Motor Vehicles § 399.211 Maintenance....

  13. 47 CFR 101.1109 - Records maintenance.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Records maintenance. 101.1109 Section 101.1109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Competitive Bidding Procedures for LMDS § 101.1109 Records maintenance. All winning...

  14. 30 CFR 57.9313 - Roadway maintenance.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Roadway maintenance. 57.9313 Section 57.9313 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... § 57.9313 Roadway maintenance. Water, debris, or spilled material on roadways which creates hazards...

  15. 12 CFR 347.205 - Record maintenance.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Record maintenance. 347.205 Section 347.205 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY INTERNATIONAL BANKING Foreign Banks § 347.205 Record maintenance. The records of each insured branch shall...

  16. 7 CFR 772.5 - Security maintenance.

    Science.gov (United States)

    2010-01-01

    ... liquidation if warranted. (3) For real estate security for IMP loans, service the account according to 7 CFR... 7 Agriculture 7 2010-01-01 2010-01-01 false Security maintenance. 772.5 Section 772.5 Agriculture... SPECIAL PROGRAMS SERVICING MINOR PROGRAM LOANS § 772.5 Security maintenance. (a) General. Borrowers...

  17. 40 CFR 86.098-25 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Maintenance. 86.098-25 Section 86.098-25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...-Fueled and Methanol-Fueled Heavy-Duty Vehicles § 86.098-25 Maintenance. (a) (b)(1)-(2) (3)(i)-(v)...

  18. 23 CFR 660.115 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 660.115 Section 660.115 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.115 Maintenance. The cooperator having jurisdiction over a FH...

  19. 40 CFR 86.007-25 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Maintenance. 86.007-25 Section 86.007-25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...-Fueled and Methanol-Fueled Heavy-Duty Vehicles § 86.007-25 Maintenance. Section 86.007-25 includes...

  20. 40 CFR 86.094-25 - Maintenance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Maintenance. 86.094-25 Section 86.094...-Fueled and Methanol-Fueled Heavy-Duty Vehicles § 86.094-25 Maintenance. (a)(1) Applicability. This section applies to light-duty vehicles, light-duty trucks, and heavy-duty engines. (2)...

  1. Mine maintenance - the cost of operation

    Energy Technology Data Exchange (ETDEWEB)

    Kreilis, O.; Singleton, T. [Southern Engineering Services (Australia)

    1998-12-31

    Increasing world competition puts pressure on sales volumes and prices. This in turn reduces potential profit margins. This in turn increases the focus on costs. Increasing demands on quality and service puts pressure on delivery performance - the right product at the right time. This in turn reduces the scope for errors and delays - and this in turn increases focus on equipment reliability. In the mining industry, both costs and equipment reliability have one significant thing in common - they are driven substantially by maintenance. Maintenance, once the Cinderella of the boardroom is a pivotal function and demands management attention and, if managed well, can be a source of competitive advantage. They made the decision to put maintenance high on their agendas because they realised that good maintenance is a vital factor in achieving excellence. Maintenance, because of its impact on return on capital, is a key driver of performance. By reducing maintenance costs, companies can improve their performance. Top managers are increasingly recognising that maintenance is an area in which they must be involved. As Australian mining and metallurgical companies look to the year 2000 and beyond, maintenance will become an increasingly strategic function, capable of delivering sustainable competitive advantage to those companies that get it right. 7 refs., 5 figs.

  2. Stick with a School Maintenance Plan

    Science.gov (United States)

    Kennedy, Mike

    2012-01-01

    The U.S. Department of Education's "Planning Guide for Maintaining School Facilities" states that a sound facilities maintenance plan serves as evidence that school facilities are, and will be, cared for appropriately. On the other hand, negligent facilities maintenance planning can cause real problems. Budget restraints and cuts in areas not…

  3. Void Fraction Instrument operation and maintenance manual

    International Nuclear Information System (INIS)

    This Operations and Maintenance Manual (O ampersand MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document

  4. Maintenance Personnel Performance Simulation (MAPPS) model

    International Nuclear Information System (INIS)

    A stochastic computer model for simulating the actions and behavior of nuclear power plant maintenance personnel is described. The model considers personnel, environmental, and motivational variables to yield predictions of maintenance performance quality and time to perform. The mode has been fully developed and sensitivity tested. Additional evaluation of the model is now taking place

  5. Maintenance experience at Rajasthan atomic power station

    International Nuclear Information System (INIS)

    The Rajasthan Atomic Power Station is a twin-unit station of the CANDU-PHW type with a nominal rating of 200 MW(e) net per unit and on-power refuelling capability. Unit-I became critical in August 1972 and was declared commercial in December 1973. Unit-II is in an advanced stage of construction. Maintenance and repairs of both the nuclear and conventional equipment are done during routine planning, breakdown outages, poison shutdown outages and planned annual shutdown periods. Yearly, a period of three to four weeks may be needed for carrying out major inspection and maintenance activity on large equipment such as the steam turbine, generator, main condenser, station transformer, primary coolant recirculation pumps, moderator pumps and fuelling machines. Preventive maintenance jobs are planned and executed in accessible areas daily as a matter of routine and during poison shutdown outages in inaccessible areas. This requires that the maintenance crews be more or less continually on the alert. In addition to gamma radiation, radiation doses due to tritium are encountered and pose special problems for the maintenance personnel. During the past two years (1972-74) it was found that there is a need, in the maintenance crews, for more specialists for various radioactive and conventional jobs. This paper outlines the significant nuclear and conventional maintenance activities as well as problems in maintenance encountered during the period 1972-74. (author)

  6. Test, Control and Monitor System maintenance plan

    Science.gov (United States)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  7. Information Technology Applications to Maintenance Management

    Institute of Scientific and Technical Information of China (English)

    Abdul Raouf S.I.

    2003-01-01

    Application of IT (Information Technology) to equipment management have not been ade-quately made. A system using Benefit Evaluation Ladder is described for evaluating the need for IT ap-plications to maintenance management. A systematic evaluation scheme for Computerized Maintenance Management System (CMMS) is presented.

  8. Guidelines for Using Building Information Modeling for Energy Analysis of Buildings

    Directory of Open Access Journals (Sweden)

    Thomas Reeves

    2015-12-01

    Full Text Available Building energy modeling (BEM, a subset of building information modeling (BIM, integrates energy analysis into the design, construction, and operation and maintenance of buildings. As there are various existing BEM tools available, there is a need to evaluate the utility of these tools in various phases of the building lifecycle. The goal of this research was to develop guidelines for evaluation and selection of BEM tools to be used in particular building lifecycle phases. The objectives of this research were to: (1 Evaluate existing BEM tools; (2 Illustrate the application of the three BEM tools; (3 Re-evaluate the three BEM tools; and (4 Develop guidelines for evaluation, selection and application of BEM tools in the design, construction and operation/maintenance phases of buildings. Twelve BEM tools were initially evaluated using four criteria: interoperability, usability, available inputs, and available outputs. Each of the top three BEM tools selected based on this initial evaluation was used in a case study to simulate and evaluate energy usage, daylighting performance, and natural ventilation for two academic buildings (LEED-certified and non-LEED-certified. The results of the case study were used to re-evaluate the three BEM tools using the initial criteria with addition of the two new criteria (speed and accuracy, and to develop guidelines for evaluating and selecting BEM tools to analyze building energy performance. The major contribution of this research is the development of these guidelines that can help potential BEM users to identify the most appropriate BEM tool for application in particular building lifecycle phases.

  9. Building trust

    International Nuclear Information System (INIS)

    'Activate' is the energy magazine for secondary schools and is part of the Education Programme which is managed on behalf of the British Nuclear Industry Forum by AEA Technology. activate is the flagship communication device between the British Nuclear Industry Forum's Education Programme and secondary schools in the UK. It was developed from a previous publication, Nuclear Bulletin. There is a need for the nuclear industry to build trust with teachers and students in the UK, where for a long time, everything that the industry has said, written or printed has been disregarded by school teachers as propaganda. Over the last few years the industry has put in a great deal of effort to position itself as a provider of educationally sound and socially acceptable information. 'Activate' was an evolution of this idea and there was a hole in the market for a lively, activity and article based magazine that could be used in the classroom. The target audience is principally teachers of science, mathematics and geography, but also includes teachers of art,, English and history with students of between 11 and 18. The results were very positive in that teachers appreciated the colourful and lively nature of activate and they felt that it provided information and opinions in an un biased and non-propagandist way. Their comments about layout, number of activities style of presentation were taken into account and during the summer of 1994 activate was remodelled ready for re launch in September. The feedback so far is good with more teachers signing up every week to receive their own free copy

  10. Hitachi's maintenance technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Abstract of high maintenance technologies for nuclear power plants, the technologies for new inspection system, maintenance of in-core instruments and piping, and technologies for high output power of plants are stated. The high maintenance technologies aim at long-term stable operation, increase of capacity factor, and decrease of exposure. Some examples of maintenance technologies of in-core equipments and primary loop recirculation (PLR) piping such as stress improvement and repair work are explained. Hydrogen water chemistry (HWC) and noble metal chemical addition (NMCA) for corrosion are described. Abstract of maintenance technologies, execution of water jet peening (WJP), outline of equipments of induction heating stress improvement (IHSI), the outside appearance of remote operation vehicle (ROV), advanced vortex nozzle (AVN), continuous cover blade (CCB), combined intermediate valve (CIV), moisture separator and heater (MSH), and evaluation examples of high output power of plants are illustrated. (S.Y.)

  11. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  12. Strategic maintenance-management in Nigerian industries

    Energy Technology Data Exchange (ETDEWEB)

    Eti, Mark C. [Mechanical Engineering Department, Rivers State University of Science and Technology, PMB 5080 Nkpolu, Oroworukwo, Port Harcourt, Rivers State (Nigeria); Ogaji, S.O.T.; Probert, S.D. [School of Engineering, Cranfield University, Bedfordshire MK43 OAL (United Kingdom)

    2006-03-01

    A developing society needs to adapt to change and foster creativity. In the pursuit of continual improvement (e.g., reducing fossil-fuel consumption and waste, better service performance, greater availability and improved reliability), implementing wise maintenance-schedules is essential for contemporary organisations. Several studies of a wide range of Nigerian industries indicate that indigenous low availability and low productivity are endemic. The resulting closure of some of these industries has triggered off a realisation of the strategic challenges in maintenance management. In addition, the increasingly-competitive business environment in Nigeria has raised the strategic importance of maintenance functions, especially in organisations with significant investments in physical assets. Five strategic aspects of maintenance management have been identified, namely: maintenance methodology; support processes; organisation and work structuring; comparable culture; and general management policy. Three factors that permeate these dimensions are wise leadership, excellent communications and an understanding of the human factors involved. [Author].

  13. Maintenance Approaches for Different Production Methods

    Directory of Open Access Journals (Sweden)

    Mungani, Dzivhuluwani Simon

    2013-11-01

    Full Text Available Various production methods are used in industry to manufacture or produce a variety of products needed by industry and consumers. The nature of a product determines which production method is most suitable or cost-effective. A continuous process is typically used to produce large volumes of liquids or gases. Batch processing is often used for small volumes, such as pharmaceutical products. This paper discusses a research project to determine the relationship between maintenance approaches and production methods. A survey was done to determine to what extent three maintenance approaches reliability-centred maintenance (RCM, total productive maintenance (TPM, and business-centred maintenance (BCM are used for three different processing methods (continuous process, batch process, and a production line method.

  14. Preventative maintenance of straddle carriers

    Directory of Open Access Journals (Sweden)

    Si Li

    2015-02-01

    Full Text Available Background: Robotic vehicles such as straddle carriers represent a popular form of cargo handling amongst container terminal operators.Objectives: The purpose of this industry-driven study is to model preventative maintenance (PM influences on the operational effectiveness of straddle carriers.Method: The study employs historical data consisting of 21 273 work orders covering a 27-month period. Two models are developed, both of which forecast influences of PM regimes for different types of carrier.Results: The findings of the study suggest that the reliability of the straddle fleet decreases with increased intervals of PM services. The study also finds that three factors – namely resources, number of new straddles, and the number of new lifting work centres – influence the performances of straddles.Conclusion: The authors argue that this collaborative research exercise makes a significant contribution to existing supply chain management literature, particularly in the area of operations efficiency. The study also serves as an avenue to enhance relevant management practice.

  15. Innovative techniques in maintenance training

    International Nuclear Information System (INIS)

    Performance based training has its beginning with a Job and Task Analysis (JTA), and culminates with the presentation of the developed training material. For optimum training effectiveness, a post training feedback mechanism is utilized to update and/or upgrade material content. A Job Task Analysis uses subject matter experts and supporting documentation to define the skills and knowledge necessary to perform functions from total position responsibilities to the simplest tasks, depending on desired results. Once skills and knowledge are defined, decisions on needed curriculum can be made including objectives, exams, and training settings (classroom, lab, or job site). This focused curriculum and the determination of best training settings are innovations of the performanced based training system. Past training experience has illustrated that a baseline level of classroom training acts as a catalyst for optimum hands-on training. The trainee exits the training phase able to do the job proficiently. This provides the training customer with quality training with minimum investment. Maintenance Training at Comanche Peak Steam Electric Station (CPSES) integrates the knowledge and skill needs by providing the individual with focused classroom presentations followed by sufficient laboratory time to practice actual task activities. Labs are configured to represent plant equipment and work environment to the maximum extent possible and duplicate in-plant work orders and procedures are used. This allows actions to be analyzed and corrective feedback given as necessary. As an added benefit, any mistakes made during training has minimal, if any, impact on plant performance

  16. Preventive maintenance for mechanical components

    International Nuclear Information System (INIS)

    In nuclear power stations as in other industrial plants, there are active and passive components whose failure is permissible only in exceptional cases both from a safety and/or economic view. Failure in this context means loss of integrity of a supporting wall, insufficient function and/or unstoppable leakage. A systematic defect must be excluded as cause of failure; the consequences of failure must be manageable. During operation, measures must be taken to maintain the required quality and detect consequences of damage mechanisms at an early stage, prior to failure. This is achieved by preventive maintenance in accordance with the latest state of knowledge. To exclude systematic errors, the quality standard of components must be re-checked every once in a while as the effects of damage mechanisms and the state of knowledge are time-dependent parameters. This requires an integrated concept, e.g. for life and ageing management, in whose context a comprehensive knowledge base is developed and regularly updated. (orig.)

  17. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  18. Study on the entire system of maintenance codes and standards

    International Nuclear Information System (INIS)

    In this study, a structure of code and standard system for plant maintenance is discussed along a process of maintenance activities. As a result of consideration, it was concluded as follows. (1) It is assumed that the entire system of maintenance codes and standards consists of four standards, that is, standards regarding maintenance planning, maintenance implementation, evaluation of inspection/maintenance results and corrective measures. (2) The maintenance guidelines and fitness-for-service codes discussed already so far occupies a position in the entire system of maintenance codes and standards. (3) Maintenance codes and standards, which have higher priority, should be developed. (author)

  19. Energy management study: A proposed case of government building

    Science.gov (United States)

    Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd; Baharum, Mohd Faizal

    2015-05-01

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.

  20. Energy management study: A proposed case of government building

    International Nuclear Information System (INIS)

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building

  1. Energy management study: A proposed case of government building

    Energy Technology Data Exchange (ETDEWEB)

    Tahir, Mohamad Zamhari; Nawi, Mohd Nasrun Mohd [School of Technology Management and Logistics, Universiti Utara Malaysia, 06010 Sintok, Kedah (Malaysia); Baharum, Mohd Faizal [School of Building, Housing and Planning, Universiti Sains Malaysia, 11800 Penang (Malaysia)

    2015-05-15

    Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.

  2. Biomimicry of Palm Tree Leaves Form and Pattern on Building Form

    Directory of Open Access Journals (Sweden)

    Agus Salim N.A.

    2014-01-01

    Full Text Available This article is a study on biomimicry of palm tree towards a building form. It is to find a suitable form and pattern that can be applied to building shell to ease building maintenance operation beside to enhance the aesthetic value of a building architecture. The research has been carried out by observation and modeling on some various species of palm tree’s patterns and forms. The result expectation can be found at the end of this research by producing the best pattern of palm tree that can be adapted to building envelop as the whole form of a building.

  3. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  4. BUILDING 341 Seismic Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Halle, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-15

    The Seismic Evaluation of Building 341 located at Lawrence Livermore National Laboratory in Livermore, California has been completed. The subject building consists of a main building, Increment 1, and two smaller additions; Increments 2 and 3.

  5. Proceedings of the fourth international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance

  6. An integral part of an integrated preventive maintenance program

    International Nuclear Information System (INIS)

    This paper outlines the evolution of the Integrated Preventive Maintenance Program from the Reliability Centered Maintenance pilot program at Bruce Nuclear Generating Station (NGS) 'A.' The Integrated Preventive Maintenance Program provides the means for taking control of the Bruce NGS 'A' Preventive Maintenance Program. In addition, the development of the Bruce NGS 'A' Air-Operated Valve Preventive Maintenance is reviewed

  7. Proceedings of the fourth international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    These proceedings record the information presented at the 4th International Conference on CANDU Maintenance held November 16-18,1997 in Toronto, Canada. The papers for these proceedings were prepared on component maintenance, human performance, steam generator leak detection, fuel channel inspections, rotating equipment maintenance, surveillance programs, inspection techniques, valve maintenance, steam generator repairs and performance, reactor aging management and preventative maintenance.

  8. Design criteria document, Maintenance Shop/Support Facility, K-Basin Essential Systems Recovery, Project W-405

    International Nuclear Information System (INIS)

    During the next 10 years a substantial amount of work is scheduled in the K-Basin Area related to the storage and eventual removal of irradiated N-Reactor fuel. Currently, maintenance support activities are housed in existing structures that were constructed in the early 1950's. These forty-year-old facilities and their supporting services are substandard, leading to inefficiencies. Because of numerous identified deficiencies and the planned increase in the numbers of K-Basin maintenance personnel, adequate maintenance support facilities that allow efficient operations are needed. The objective of this sub-project of Project W-405 is to provide a maintenance and storage facility which meets the K-Basin Maintenance Organization requirements as defined in Attachment 1. In Reference A, existing guidelines and requirements were used to allocate space for the maintenance activities and to provide a layout concept (See Attachment 2). The design solution includes modifying the existing 190 K-E building to provide space for shops, storage, and administration support functions. The primary reason for the modification is to simplify siting/permitting and make use of existing infrastructure. In addition, benefits relative to design loads will be realized by having the structure inside 190K-E. The new facility will meet the Maintenance Organization approved requirements in Attachment 1 relating to maintenance activities, storage areas, and personnel support services. This sub-project will also resolve outstanding findings and/or deficiencies relating to building fire protection, HVAC requirements, lighting replacement/upgrades, and personnel facilities. Compliance with building codes, local labor agreements and safety standards will result

  9. Effective maintenance practices to manage system aging

    International Nuclear Information System (INIS)

    For a variety of economic and technical reasons, there has been a growing concern with the aging of complex systems and components and the role that maintenance can play in reducing this degradation. A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence that their maintenance programs have on their ability to address the systems and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. The four key elements of an effective maintenance program that are important to an aging management program were identified. These are: the selection of critical systems and components; the development of an understanding of aging through the collection and analysis of equipment performance information; the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations. In examining how the four organizations have structured their maintenance programs to include these key elements provides valuable lessons not only for the nuclear power industry, but also for any industrial organization that is concerned with the management of system and component aging degradation. This document provides detail, of these studies

  10. Maintenance Implementation Plan for solid waste

    International Nuclear Information System (INIS)

    This Maintenance Implementation Plan (MIP) has been developed for. implementation of the US Department of Energy (DOE) Order 4330.4A. Maintenance Implementation Program (DOE 1990) at the Hanford Site Solid Waste complex. It addresses maintenance functions associated with Solid Waste Management, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for Solid Waste was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The MIP assessment disclosed that most elements defined in the order are currently implemented for Solid Waste. It also identified issues which must be addressed to bring the maintenance function into full compliance with DOE Order 4330.4A. These include documentation of the maintenance training program, expanded scope of inspections to address the As Low As Reasonably Achievable (ALARA) concept, development of a Master Equipment List (MEL), and more adequate facilities to provide enhanced storage and control of tools and equipment

  11. Joint optimization of LORA and spares stocks considering corrective maintenance time

    Institute of Scientific and Technical Information of China (English)

    Linhan Guo; Jiujiu Fan; Meilin Wen; Rui Kang

    2015-01-01

    Level of repair analysis (LORA) is an important method of maintenance decision for establishing systems of operation and maintenance in the equipment development period. Currently, the research on equipment of repair level focuses on economic analy-sis models which are used to optimize costs and rarely considers the maintenance time required by the implementation of the main-tenance program. In fact, as to the system requiring high mission complete success, the maintenance time is an important factor which has a great influence on the availability of equipment sys-tems. Considering the relationship between the maintenance time and the spares stocks level, it is obvious that there are contra-dictions between the maintenance time and the cost. In order to balance these two factors, it is necessary to build an optimization LORA model. To this end, the maintenance time representing per-formance characteristic is introduced, and on the basis of spares stocks which is traditional y regarded as a decision variable, a de-cision variable of repair level is added, and a multi-echelon multi-indenture (MEMI) optimization LORA model is built which takes the best cost-effectiveness ratio as the criterion, the expected num-ber of backorder (EBO) as the objective function and the cost as the constraint. Besides, the paper designs a convex programming algorithm of multi-variable for the optimization model, provides solutions to the non-convex objective function and methods for improving the efficiency of the algorithm. The method provided in this paper is proved to be credible and effective according to the numerical example and the simulation result.

  12. Danish building typologies

    DEFF Research Database (Denmark)

    Wittchen, Kim Bjarne; Kragh, Jesper

    The objective of TABULA is to develop a harmonised building typology for European countries. Each national building typology will consist of a set of residential model buildings with characteristic energy-related properties (element areas of the thermal building envelope, U-values, supply system...... efficiencies). The model buildings will each represent a specific construction period of the country in question and a specific building size. Furthermore the number of buildings, flats and the overall floor areas will be given, which are represented by the different building types of the national typologies....

  13. Building sustainable ecosystem-oriented architectures

    CERN Document Server

    Bassil, Youssef

    2012-01-01

    Currently, organizations are transforming their business processes into e-services and service-oriented architectures to improve coordination across sales, marketing, and partner channels, to build flexible and scalable systems, and to reduce integration-related maintenance and development costs. However, this new paradigm is still fragile and lacks many features crucial for building sustainable and progressive computing infrastructures able to rapidly respond and adapt to the always-changing market and environmental business. This paper proposes a novel framework for building sustainable Ecosystem- Oriented Architectures (EOA) using e-service models. The backbone of this framework is an ecosystem layer comprising several computing units whose aim is to deliver universal interoperability, transparent communication, automated management, self-integration, self-adaptation, and security to all the interconnected services, components, and devices in the ecosystem. Overall, the proposed model seeks to deliver a co...

  14. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  15. Safe and Sustainable Tall Buildings - State of the Art

    Directory of Open Access Journals (Sweden)

    Mendis P.

    2012-01-01

    Full Text Available Tall buildings are becoming very popular around the world. Asia will have most of the tall buildings in this century. Both safety and sustainability aspects are important in planning and designing these buildings. The design and construction of tall buildings present many challenges for the design team, from engineers, architect through to the builder. Although structural systems could be developed and construction solutions could be found to design and construct very tall buildings in excess of 1 km (even 1 mile, other aspects such as fire and egress, long-term movements, environmental wind and perception of motion (including damping for dynamic effects, transportation (lifts issues, sustainability, durability and maintenance will govern and may even restrict the heights. Current practices and important issues related to design of safe and sustainable design of tall buildings are discussed in this paper.

  16. Building Areas - USACE IENC

    Data.gov (United States)

    Department of Homeland Security — These inland electronic Navigational charts (IENCs) were developed from available data used in maintenance of Navigation channels. Users of these IENCs should be...

  17. Optimising maintenance at the DOEL 3 and 4 power station in order to improve maintenance effectiveness and control maintenance cost

    International Nuclear Information System (INIS)

    This text deals with the reorganization of a nuclear power plant, in order to improve safety conditions and to reduce maintenance costs. The authors describe the installation, the process, the management of this method. (TEC). 3 figs

  18. 41 CFR 105-53.147 - Public Buildings Service.

    Science.gov (United States)

    2010-07-01

    ... space is used more effectively and efficiently; providing leadership in the development and maintenance... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Public Buildings Service. 105-53.147 Section 105-53.147 Public Contracts and Property Management Federal Property...

  19. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 20 November. Fixed-line telephone and audioconference services may be disrupted while the work is being carried out. However, the CCC and the fire brigade will be reachable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. For further details about the maintenance work, please contact the telephone switchboard on 76111 or by email. Telecom Section - IT/CS

  20. Maintenance of the CERN telephone exchanges

    CERN Multimedia

    2007-01-01

    Maintenance work will be carried out on the CERN telephone exchanges between 8 p.m. and midnight on 20 November. Fixed-line telephone and audioconference services may be disrupted while the work is being carried out. However, the CCC and the fire brigade will be contactable at any time. Mobile telephony services (GSM) will not be affected by the maintenance work. For further details about the maintenance work, please contact the telephone switchboard on 76111 or by email to standard.telephone@cern.ch. Telecom Section IT/CS

  1. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  2. Operation and maintenance of offshore wind farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.; Madsen, Erik Skov; Bilberg, Arne

    The offshore wind industry is booming and larger, more efficient wind-turbines have constantly been introduced into the market. However, research within the field of the operation and maintenance (O&M) of offshore wind farms is limited as the field is still immature. In this paper, two current...... maintenance models - RCM and TPM - are discussed in this context. Furthermore, through a case study, the paper looks into Modularization and SSLP, as these concepts can be utilized to optimize maintenance. This is a new approach for the offshore wind industry....

  3. Maintenance Optimization of High Voltage Substation Model

    Directory of Open Access Journals (Sweden)

    Jan Gala

    2008-01-01

    Full Text Available The real system from practice is selected for optimization purpose in this paper. We describe the real scheme of a high voltage (HV substation in different work states. Model scheme of the HV substation 22 kV is demonstrated within the paper. The scheme serves as input model scheme for the maintenance optimization. The input reliability and cost parameters of all components are given: the preventive and corrective maintenance costs, the actual maintenance period (being optimized, the failure rate and mean time to repair - MTTR.

  4. Maintenance Implementation Plan for T Plant

    International Nuclear Information System (INIS)

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the T Plant facility complex located in the 200 West Area of the Hanford Site in South Central Washington State. The objective of the MIP is to describe how the T Plant facility will implement the requirements established by DOE Order 4330.4A, ''Maintenance Management Program,'' Chapter 2.0, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the Order is prioritized, categorized, and then placed into one of three phases for implementation

  5. Sustainable Buildings in Interaction

    DEFF Research Database (Denmark)

    Elle, Morten

    developments are going to consist of passive houses. The first sustainable buildings were built by their users, and the user – building interaction still play a decisive role for the performance of the present sustainable buildings. The users have to understand how the building functions. Urban design is...... essential for the possibilities of a sustainable building design: orientation and access to infrastructure are important factor. And the building design is decisive in making the city truly compact: dense in activities. In future, the interaction between the technical infrastructure, the buildings and their......The first attempts to build sustainable buildings in Denmark were typically located on the countryside. The basic idea was to create buildings that were independent of the technical infrastructure. District heating has, however, been the dominating solution to heating in buildings in Denmark, and...

  6. Application of plant Technology Knowledge Infrastructure to plant engineering and maintenance

    International Nuclear Information System (INIS)

    Management and maintenance tools are now greatly available for contributing reduction of maintenance cost and time. These tools surely give us much benefit, but are only for maintaining reliabilities of the equipment. Reliability of the plant depends on the design and actual operating conditions. Accordingly, the matter to do first is to consider facilities in the range of the plant life cycle. This brings the result that 'process property' and 'functional property' are required besides 'equipment property' which has been used for the evaluation index. Because these properties are formed at the designing stage, the beginning of the life cycle, and by applying the equipment function to them, maintenance cost can be reduced without risk increasing. To execute this subject, it is strongly required to accumulate information and data, to build up the Technology Knowledge Infrastructure. This paper reports the system and the way of applying the method to the actual plants. (author)

  7. Analysis of the Improvement Methods for Equipment Maintenance Support

    Institute of Scientific and Technical Information of China (English)

    ZHANG Rui-chang; ZHAO Song-zheng

    2005-01-01

    According to military requirement, and based on the problems of equipment maintenance support methods in high-tech battles, each element supporting equipment maintenance is analyzed, and the methods for improving equipment maintenance are proposed.

  8. Plant Maintenance. The Licensee's Viewpoint

    International Nuclear Information System (INIS)

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  9. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  10. Maintenance grouping for multi-component systems with availability constraints and limited maintenance teams

    International Nuclear Information System (INIS)

    The paper deals with a maintenance grouping approach for multi-component systems whose components are connected in series. The considered systems are required to serve a sequence of missions with limited breaks/stoppage durations while maintenance teams (repairmen) are limited and may vary over time. The optimization of the maintenance grouping decision for such multi-component systems leads to a NP-complete problem. The aim of the paper is to propose and to optimize a dynamic maintenance decision rule on a rolling horizon. The heuristic optimization scheme for the maintenance decision is developed by implementing two optimization algorithms (genetic algorithm and MULTIFIT) to find an optimal maintenance planning under both availability and limited repairmen constraints. Thanks to the proposed maintenance approach, impacts of availability constraints or/and limited maintenance teams on the maintenance planning and grouping are highlighted. In addition, the proposed grouping approach allows also updating online the maintenance planning in dynamic contexts such as the change of required availability level and/or the change of repairmen over time. A numerical example of a 20-component system is introduced to illustrate the use and the advantages of the proposed approach in the maintenance optimization framework. - Highlights: • A dynamic maintenance grouping strategy is proposed for multi-component systems. • A grouping approach based on rolling horizon, GA and MULIFIT algorithms is proposed. • Impacts of availability and/or limited repairmen constraints are highlighted. • An optimal planning under availability and/or limited repairmen constraints is given. • The maintenance planning can be dynamically updated in the presence of dynamic contexts

  11. Rehabilitation of Existing School Buildings or Construction of New Buildings? Criteria for Boards of Education, Administrators and School Business Officials.

    Science.gov (United States)

    Sessions, E. B.

    The first of the three parts in this research bulletin is devoted to definitions and policy establishment. Terms defined are remodeling, rehabilitation, modernization, and repair. Part II is an inventory of questions to be asked before a decision is made to rehabilitate an existing school structure or construct a new building. Maintenance,…

  12. Upgrade Opportunities for Buildings in City Centres

    Directory of Open Access Journals (Sweden)

    Silva M.

    2012-10-01

    Full Text Available This proposal focus on the potential of the existing buildings upgrade process in achieving the 20-20-20 goals, as these are the biggest energy consumers, the most significant built area and the better placed buildings within our cities. These buildings frequently lack basic maintenance and need intervention, but include within themselves a vast amount of incorporated energy and centuries of construction knowledge. Beyond the advantages that may result from re-attracting people back into the city centre, upgrading these existing buildings can also have positive bounce-back effect on the reduction of the energy needs related to transportation, as demonstrated in studies that alert to the impact of the building sprawl in the total energy use. As “buildings account for 40 % of total energy consumption in the Union”, the better performance of this sector has a significant role, remembering that “these requirements shall take account of general indoor climate conditions, in order to avoid possible negative effects such as inadequate ventilation, as well as local conditions and the designated function and the age of the building” [1]. The importance of “upgrading” the existing buildings resides on the fact that new buildings represent only approximately 1 or 2% of the total usable area, an estimate that is bound to decrease due to the current construction crisis. While the recent buildings tend to be more efficient, the numerous existing buildings are important stakeholders due to their massive consumptions and incorporated energy. The ongoing Annex 56 on “Energy & Greenhouse Gas Optimized Building Renovation” assumes that “Current standards do not respond effectively to the numerous constraints imposed by existing buildings and in many cases, the requirements result in very expensive measures and complex procedures, seldom accepted by occupants, owners or developers. It is then urgent for the new standards to respond to these

  13. Analysis of the Determinant Factors Development of Maintenance Culture in Malaysian Local Authorities

    Directory of Open Access Journals (Sweden)

    Sani S.I.A.

    2014-01-01

    Full Text Available Malaysia is a fast growing developing country and its vision is becoming a developed country with a first class infrastructure. Towards this vision, the assets and facilities were developed, owned or leased by public sector especially buildings, constructions and infrastructures to fulfill administrative and social needs as well as economic responsibilities to general public. In Malaysia, public asset and facilities is owned by three major levels of government, which are the federal government, state government and the local government also known as local authority. Between these three forms of government, Local Authorities hold a large number of facilities that place demands on resources. They have a responsibility to use and maintain a wide range of property assets including classified and heritage buildings, single purpose facilities and state of the art multipurpose facilities. Over the years, the local authorities in Malaysia currently have been soundly criticized by public caused poor maintenance culture. The assets especially public buildings and infrastructures are not maintained properly. Thus, developing the maintenance culture is essential to increase the awareness about maintenance activity on public facilities and assets in Malaysian Local Authorities. Regarding this scenario, the purpose of this study is to determine the determinant factors affecting development of maintenance culture identified based on the review of previous research. As a guide to achieve the research objective, a questionnaire survey was conducted to investigate the significance of ten determinant factors identified in the research study and their related affecting to development of maintenance culture in local authority as a respondent in this research. The collected data was then analyzed using quantitative approaches such as mean analysis, relative important index as well as others.

  14. Proceedings of the third international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately

  15. Predication and Optimization of Maintenance Resources for Weapon System

    OpenAIRE

    Yabin Wang

    2011-01-01

    Maintenance resources are important part of the maintenance support system. The whole efficiency of weapon system is directly affected by the allocation of maintenance resources. Joint support for weapon system of multi-kinds of equipments is the main fashion of maintenance support in the future. However, there is a lack of the efficiency tools and methods for predication and optimization of weapon system maintenance resources presently. For the prediction requirement of maintenance resources...

  16. A Model of Software Maintenance for Large Scale Military Systems

    OpenAIRE

    Mostov, Isaak

    1990-01-01

    The maintenance of large military software systems is complex, involves users as well as software professionals, and requires appropriate management, which is one of the most important factors in efficient maintenance. Maintenance management requires information about the current state of the maintenance process that should be organized within a maintenance-oriented Enginering Database. This database should include all the necessary data about software changes, system configeration, mainten...

  17. Whole Building Design Objectives for Campus Safety and Security: A System Dynamics Approach

    Science.gov (United States)

    Oakes, Charles G.

    2010-01-01

    The May/June 2009 issue of "Facilities Manager" introduced APPA readers to the Whole Building Design Guide (WBDG)--today's most comprehensive Internet-based depository of resources contributing to a systems approach for everything of a building nature. The emphasis in that article was on Operations and Maintenance (O&M) issues and procedures. In…

  18. Optimum Maintenance Strategies for Highway Bridges

    DEFF Research Database (Denmark)

    Frangopol, Dan M.; Thoft-Christensen, Palle; Das, Parag C.;

    expected life-cycle costs or maximum life-cycle benefits. This is because many maintenance activities can be associated with significant costs, but their effects on bridge safety can be minor. In this paper, the program of an investigation on optimum maintenance strategies for different bridge types is......As bridges become older and maintenance costs become higher, transportation agencies are facing challenges related to implementation of optimal bridge management programs based on life cycle cost considerations. A reliability-based approach is necessary to find optimal solutions based on minimum...... described. The end result of this investigation will be a general reliability-based framework to be used by the UK Highways Agency in order to plan optimal strategies for the maintenance of its bridge network so as to optimize whole-life costs....

  19. South Blackwater Coal`s maintenance program

    Energy Technology Data Exchange (ETDEWEB)

    Nash, J. [South Blackwater Coal Limited, Blackwater, Qld. (Australia)

    1998-09-01

    The South Blackwater operation consists of two opencut mining areas and two underground mines (Laleham and Kenmure) near Blackwater in central Queensland, all of which supply coal to a central coal preparation plant. South Blackwater Coal Ltd. recently developed a maintenance improvement programme, described in this article. The programme involved implementation systems of key performance indicators (KPIs), benchmaking, condition monitoring, work planning and control, failure analysis and maintenance audit. Some improvements became almost immediately apparent, others were quite gradual. Major results included: improved availability (and reliability) of all opencast fleets, improvements in rear dump availability; reduced maintenance man-hours for opencast fleets; and increased availability of the coal handling and preparation plant. The paper is an edited version of that presented at the `Maintenance in mining conference` 16-19 March 1998, held in Bali, Indonesia. 4 figs., 2 photos.

  20. Self-Esteem Maintenance in Family Dynamics.

    Science.gov (United States)

    Tesser, Abraham

    1980-01-01

    In this study, a self-esteem maintenance model is introduced and is used to test predictions about sibling identification, sibling friction, and the closeness of father-son relationships as they relate to sibling performance. (Author/SS)