WorldWideScience

Sample records for building contractors

  1. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  2. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  3. Decision model for facade contractor selection – EDA center building

    OpenAIRE

    Marinič, Jani

    2010-01-01

    In my thesis I presented a decision model for facade contractor selection for the business part of EDA center in Nova Gorica. EDA center is a commercial and residential building, that will be constructed in the city center. The garage, commercial, business and residential part of the building will bring to the city new conceptual quality areas that will provide additional comfort for residents and visitors. It´s easy to come to the right decision in a simple and fast way to solve a problem wi...

  4. The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia

    Directory of Open Access Journals (Sweden)

    Salihudin Hassim

    2009-01-01

    Full Text Available The use of IBS (Industrialised Building System has attracted a lot of countries like Singapore, Sweden, Germany, Japan and the United Kingdom. This system can replace the conventional building system which is labour oriented. However, since the first project of IBS in year 1964 till today, IBS in Malaysia is not well accepted by the construction parties because of failure to adequately deal with risks in the IBS projects. To address this matter, this study had identified the risks faced by contractor in IBS construction projects. The risk identification techniques used were brainstorming, analysis of journal and conference papers and discussion with practitioners and data were collected by a questionnaire survey on contractors. It was found that there are twelve major risks in construction using IBS which are; acts of God, change in work and defective design, changes in government regulation, contractor competence, delayed payment and resolving contractual issues, financial failure-any party, labour and equipment productivity, labour, equipment and material availability, quality of work, safety, site access/right of way and suppliers/manufacturers poor performance. Therefore, it is hoped that the finding of this research could assist Malaysian contractors in making risk management planning besides improving decisions making to achieve project.

  5. An Analysis of Cost Management Strategies Employed By Building Contractors on Projects in Zimbabwe

    Directory of Open Access Journals (Sweden)

    Benviolent Chigara

    2013-11-01

    Full Text Available The construction industry is a major consumer of capital resources by virtue of the magnitude, complexity and nature of the works it executes. Yet improving cost performance still remains a chronic challenge facing the construction industry worldwide. Apart from advances made by contractors to devise mechanisms to manage project cost, studies across the world reveal that construction projects are hardly completed within budget. The Zimbabwean construction industry has not been spared either. However, this background is considered unhealthy for an industry whose capital consumption is heavy and concomitant cost overruns spell disastrous financial consequences on the investor. This study explored cost management strategies employed by contractors on building projects and also investigated the challenges that contractors encounter in managing project cost. Exploratory research design was employed making use of both questionnaires and interviews to collect data from selected contractors registered under category A, B and C of the Construction Industry Federation of Zimbabwe (CIFOZ. The study observed that in the majority of cases, contractors’ efforts to manage projects costs are centred on management of project resources. Additionally, monthly cost reports, variance management, project budgets and cash flow forecasting are among the other strategies. However,  in spite of the growing trend to automate cost control systems, there is evidence to suggest that the traditional paper based systems of storing and managing information is widely used in the industry. Contrary to having cost management systems in place, contractors admit experiencing cost overruns on their projects. These cost overruns are attributable to organizational related challenges, shortage of skilled personnel, and unavailability of some building materials on the local market, variations and deficiency in cost control systems

  6. Perceptions of Contractors and Consultants Toward Application of Greenship Rating Tools on Apartment Buildings in Surabaya

    Directory of Open Access Journals (Sweden)

    Herry Pintardi Chandra

    2014-04-01

    Full Text Available During the last ten years, the growth of apartment buildings in Surabaya has encountered the bitter experience of global warming, resource depletion, energy scarcity, and other environmental impacts. We cannot avoid them, but we can minimize the negative impacts of global warming. The green building concept is one of the methods to minimize the environmental impact. It takes into account principles of sustainable development in planning, construction, operation, and maintenance. Greenship Rating Tools is used to evaluate and calculate green achievements, prior to green building certification. The aim of this research is to represent the perceptions of contractors and consultants toward application of Greenship Rating Tools on apartment buildings in Surabaya. Based on the data obtained from a questionnaires survey carried out to 41 respondents, the mean value ranking method is used to evaluate the main factors of Greenship. These factors are Appropriate Site Development, Energy Efficiency and Conservation, Water Conservation, Material Resource and Cycle, Indoor Health and Comfort, and Building Environmental Management. In general, the results of this research show that there are a number of differences between perceptions of contractors and consultants toward application of Greenship Rating Tools on apartment buildings in Surabaya. According to the contractors’ perception, Visual Comfort is a factor that would easily to be applied, whilst consultants’ is Landscape. On the other hand, there are factors that would difficult to be applied. Based on contractors’ perceptiom is Climate Change, while consultants’ perception is Renewal Energy. In summary, Greenship Rating Tools can be applied on contractors’ and consultants’ perceptions, whilst there are some variables which can not be applied.

  7. Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment

    Energy Technology Data Exchange (ETDEWEB)

    Hult, Erin; Granderson, Jessica; Mathew, Paul

    2014-07-01

    While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hour onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.

  8. The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia

    OpenAIRE

    Salihudin Hassim; Mohd S. Jaafar; Saiful A.A.H. Sazalli

    2009-01-01

    The use of IBS (Industrialised Building System) has attracted a lot of countries like Singapore, Sweden, Germany, Japan and the United Kingdom. This system can replace the conventional building system which is labour oriented. However, since the first project of IBS in year 1964 till today, IBS in Malaysia is not well accepted by the construction parties because of failure to adequately deal with risks in the IBS projects. To address this matter, this study had identified the risks faced by c...

  9. Building America Best Practices Series Volume 14 - HVAC. A Guide for Contractors to Share with Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gilbride, Theresa L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hefty, Marye G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hand, James R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Love, Pat M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2011-08-01

    This guide, which is part of a series of Best Practices guides produced by DOE’s Building America program, describes ways homeowners can reduce their energy costs and improve the comfort, health, and safety of their homes by upgrading their heating, ventilation, and air conditioning (HVAC) equipment.

  10. Managing risks in the international growth business of Finnish construction contractors and building product suppliers

    OpenAIRE

    Palojärvi, Lauri

    2009-01-01

    Major changes inside Finland catalyzed the internationalization of its construction industry to initial growth in the late 1960s/early 1970s. In the year 2008, the value of its international business was app. 16 Bn€ i.e. at the same level as that of new building production in Finland. It is forecast to grow. Practitioners understand that by effective risk management (RM), the occurrence and significance of failures (or successes) can be reduced (or, alternatively, increased). Two research que...

  11. Geodesy work at Dukovany nuclear power plant site as viewed by higher building work contractor

    International Nuclear Information System (INIS)

    Geodesy work during the Dukovany nuclear power plant construction proceeded with considerable difficulties. Micronetwork points connected to an external network of fixed points were fitted onto the foundation slab of teh reactor rooms. The micronetwork was stabilized on reinforced concrete pillars joined to the reinforcement in the foundation slab. The network alignment showed an accuracy of ±0.4 to 0.8 mm. The network served as a skeleton from which the individual parts of the reactor room were laid out. In view of the uneven progress of building vertical structures, the network could not be lifted to higher floors as a whole but the individual points were joined into polygons. The so-called geodetic bridge which considerably accelerated work, and the polar measuring methods were used near the shaft. The measurement showed that all tolerances required by the design could not continuously be observed and that some were rather controversial. Only the initiative of labour and the perfect production preparation by the assembly organisation made possible the manufacture of building structures within the required tolerances. (J.B.)

  12. Building America Best Practices Series. Volume 17 - Energy Renovations-Insulation: A Guide for Contractors to Share With Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Adams, K. T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hefty, M. G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gilbride, T. L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Love, Pat M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-05-01

    This guide will help contractors and homeowners identify ways to make their homes more comfortable, more energy efficient, and healthier to live in. It also identifies the steps to take, with the help of a qualified home performance contractor, to increase their home’s insulation, ensure healthy levels of ventilation, and prevent moisture problems. Contractors can use this document to explain the value of these insulation measures to their customers. The references in this document provide further explanation of insulation techniques and technologies.

  13. Contractor safety

    International Nuclear Information System (INIS)

    The recent trend in the United States and Shell Oil Company EandP has been to increase use of contractors to do specialized work. Many companies now use contractors almost exclusively for operations such as drilling, well workovers, construction, and many specialty and routine maintenance tasks. Today, approximately 75% of Shell Oil Company's actual operating work force in EandP is contract. Clearly, HSandE considerations must become an increasingly important part of the contractor selection process. This paper reports on the Shell Oil Company's evolution from a bidder selection process to a program of Matching Owner and Contractor. Well has begun to expand efforts to make better assessments of contractor's HSandE capabilities and values in pre-bid considerations. Focus is on pre-bid evaluations to select contractors that have strong HSandE commitments and values. Contractor safety performance in this industry must be brought up to the same standards as operating companies. In Shell Oil EandP is only willing to contractors who can and are willing to do that

  14. Information for contractors' staff

    CERN Multimedia

    The Dosimetry Service

    2005-01-01

    We have observed a significant decrease in the number of completed Certificates for Work in Controlled Radiation Areas being submitted with applications for dosimeters for your staff. Henceforth, we shall no longer be able to issue dosimeters without a certificate, which must be signed by the employee and the contractor's radiation-protection expert. You can obtain the certificate form from the Dosimetry Service at Building 24/E-011 or from our Website: http://service-rp-dosimetry.web.cern.ch/service-rp-dosimetry/. Thank you for your understanding. The Dosimetry Service

  15. Information for contractors' staff

    CERN Multimedia

    Dosimetry Service

    2005-01-01

    We have observed a significant decrease in the number of completed Certificates for Work in Controlled Radiation Areas being submitted with applications for dosimeters for your staff. Henceforth, we shall no longer be able to issue dosimeters without a certificate, which must be signed by the employee and the contractor's radiation-protection expert. You can obtain the certificate form from the Dosimetry Service at Building 24/E-011 or from our Website: http://service-rp-dosimetry.web.cern.ch/service-rp-dosimetry/ Thank you for your understanding. The Dosimetry Service

  16. List of Contractors to Support Anthrax Remediation

    Energy Technology Data Exchange (ETDEWEB)

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14

    This document responds to a need identified by private sector businesses for information on contractors that may be qualified to support building remediation efforts following a wide-area anthrax release.

  17. 承包方建设工程项目施工成本控制%Construction Cost Control of Contractor Building Project

    Institute of Scientific and Technical Information of China (English)

    吴桃英; 林生峰

    2014-01-01

    This paper introduces the composition of constr-uction cost and the main influence factors to the construction project construction cost, and analyzes the basis of contractor control the construction project cost, final y summarizes the control requirements and specific control measures for con-struction cost of contractor departments and personnel.%本文介绍了施工成本的构成、影响建设工程项目施工成本的主要因素,分析了承包方对施工项目成本控制的依据,总结出对承包方部门及人员施工成本控制的要求以及控制的具体措施。

  18. Contractor or Employee? Reporting Independent Contractor Payments.

    Science.gov (United States)

    Dickson, Roger J.

    1993-01-01

    Congress has approved new penalties to be assessed against employers who improperly file required tax forms. Includes a 20-factor control test developed by the Internal Revenue Service to help determine whether a worker is an employee or an independent contractor. School business officials should review payment procedures to ensure that proper tax…

  19. Construction contractors involvement in disaster management planning

    OpenAIRE

    Peter Stringfellow

    2014-01-01

    Disasters, both natural and man-made, cause major damage and loss of life. Because of this, governments around the world are looking at building resilience to ensure communities can recover quickly and have minimal impact from a disaster. Part of building resilience is to plan for disaster management and recovery. Literature reveals that construction contractors can play a critical role within this process as they have control of resource supply chains and key knowledge and skills they are we...

  20. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  1. Hydrogen Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  2. A guide for the prospective Navy contractor

    OpenAIRE

    Manning, Cameron Alan

    1991-01-01

    The United States Naval Facilities Engineering Command awarded over 1-billion dollars in construction contracts in 1990 and is expected to increase that figure in 1991. These contracts will be awarded all over the world. They will range in size from five thousand dollar playgrounds to hundred million dollar buildings. The objective of this paper is to develop a guide that will allow contractors to make a smooth transition from contracting with other sources into contracting with the United St...

  3. Building

    OpenAIRE

    Seavy, Ryan

    2014-01-01

    Building for concrete is temporary. The building of wood and steel stands against the concrete to give form and then gives way, leaving a trace of its existence behind. Concrete is not a building material. One does not build with concrete. One builds for concrete.

  4. Employee vs independent contractor.

    Science.gov (United States)

    Kolender, Ellen

    2012-01-01

    Finding qualified personnel for the cancer registry department has become increasingly difficult, as experienced abstractors retire and cancer diagnoses increase. Faced with hiring challenges, managers turn to teleworkers to fill positions and accomplish work in a timely manner. Suddenly, the hospital hires new legal staff and all telework agreements are disrupted. The question arises: Are teleworkers employees or independent contractors? Creating telework positions requires approval from the legal department and human resources. Caught off-guard in the last quarter of the year, I found myself again faced with hiring challenges. PMID:23599033

  5. Operator/contractor relationships

    International Nuclear Information System (INIS)

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  6. Construction contractors involvement in disaster management planning

    Directory of Open Access Journals (Sweden)

    Peter Stringfellow

    2014-06-01

    Full Text Available Disasters, both natural and man-made, cause major damage and loss of life. Because of this, governments around the world are looking at building resilience to ensure communities can recover quickly and have minimal impact from a disaster. Part of building resilience is to plan for disaster management and recovery. Literature reveals that construction contractors can play a critical role within this process as they have control of resource supply chains and key knowledge and skills they are well suited to assist in disaster planning. However, as literature also reveals there is currently little involvement of construction contractors in the disaster planning process. This gap between what should be done and what is currently done is investigated. Representatives from industry bodies are interviewed to determine their understanding of the industry’s involvement in disaster planning and what capacity the industry might have to be involved. The interviewee’s responses agree with current literature that there is currently little or no involvement with disaster planning however there is interest in being involved with disaster management planning if there was a forum for this to occur. Based on the responses the researcher has proposed a model to engage construction contractors within state government disaster management planning.

  7. National Radon Contractor Proficiency Program. Proficiency report, October 1990

    International Nuclear Information System (INIS)

    The report lists those individual contractors in the United States who have met the requirements of the Radon Contractor Proficiency (RCP) Program as of August 18, 1990. These requirements are designed to provide minimum proficiency criteria for individuals who design and supervise the installation of radon mitigation systems in buildings. (Some States have more stringent requirements as part of their radon certification programs. The States should be consulted directly for details on their programs; see Section 5 for a list of State radon contacts). The RCP Program measures the proficiency of an individual contractor, not their company. Therefore, users of the report who select a mitigation firm should ensure that the services are provided by the listed contractor. The National RCP Program does not accredit mitigation contractors, nor does it certify, recommend, or endorse participating companies. Only the listed contractor, not their company of affilation, are deemed proficient. The inclusion of a contractor in the report should not be interpreted as a certification or accreditation of the individual or affiliated company

  8. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  9. Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives

    Directory of Open Access Journals (Sweden)

    Alan Griffith

    2012-11-01

    Full Text Available Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has gained in popularity. However, the characteristics of the process, although well identified, continue to create confusion and problems for clients and contractors alike. This paper focuses on the dynamics of design and build novation from the principal contractor's and architect's perspectives. It embraces key aspects of both the pre-contract and post-contract environment. Its contribution forms a part of a major UK Government funded research project investigating design and build best practice. The findings presented in this paper broadly indicate that contractors believe novated design and build can be disadvantageous and that considerable fragmentation can be created in what should be an integrated procurement approach.

  10. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  11. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  12. Contractor Prequalification Based on Neural Networks

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jin-long; YANG Lan-rong

    2002-01-01

    Contractor Prequalification involves the screening of contractors by a project owner, according to a given set of criteria, in order to determine their competence to perform the work if awarded the construction contract. This paper introduces the capabilities of neural networks in solving problems related to contractor prequalification. The neural network systems for contractor prequalification has an input vector of 8 components and an output vector of 1 component. The output vector represents whether a contractor is qualified or not qualified to submit a bid on a project.

  13. Private Security Contractors in Darfur

    DEFF Research Database (Denmark)

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization of...... security alters security practices (including those involving states) than in thinking about their impact on an idealised public monopoly on the use of force. To make its point, the article begins by drawing on Foucauldian work to clarify the meaning of neo-liberal governmentality in security. It...... on a framework of analysis inspired by Bourdieu, we show that neo-liberal governmentality is reflected in the dispositions of security actors as well as in their relative positions. The resulting security practices reinforce dispositions and positions that reproduce neo-liberal governmentality...

  14. Private Military and Security Contractors

    DEFF Research Database (Denmark)

    In Private Military and Security Contractors: Controlling the Corporate Warrior a multinational team of 16 scholars and a practitioner from political science, sociology, and law address a developing phenomenon: controlling the use of privatized force by states in international politics. Robust...... analyses of the evolving, multi-layered tapestry of formal and informal mechanisms of control include addressing the microfoundations of the market: the social and role identities of contract employees, their acceptance by military personnel, and potential tensions between them. The extent and willingness...... of key states—South Africa, the United States, Canada, the United Kingdom, and Israel—to monitor and enforce discipline to structure their contractual relations with PMSCs on land and at sea is examined, as is the ability of the industry to regulate itself. Finally, they assess the nascent...

  15. Advantages of the production contractor concept

    International Nuclear Information System (INIS)

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  16. Radon in buildings

    International Nuclear Information System (INIS)

    This guide is intended to inform designers, contractors, householders and other building owners about radon in buildings and to provide guidance where it has been decided to take action to reduce radon levels. It gives some pointers to good practice insofar as it relates to non complex buildings of normal design and construction. Reference is made to the usual ways of reducing l;levels of radon and guidance is given on sources of further information. I

  17. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  18. Challenge for drilling contractors continues into 1990s

    International Nuclear Information System (INIS)

    This paper reports that the keys to success for the drilling contractor of the 1990s include: Financial prudence, in terms of demanding realistic returns from customers; Resisting the urge to begin speculative rig building when conditions start to improve; Avoiding the temptation to chase various foreign markets through costly rig moves without solid contracts. In a few months, the contract drilling industry will mark a full decade since it was healthy and profitable throughout the world. U.S.-based land drilling contractors, which still make up the largest single part of the drilling industry, have suffered through 10 years of financial losses. These losses eroded the net worth of many independent contractos who had no other substantial resources to subsidize the drilling operations. By now, even those with external resources have exhausted these funds or have decided to quit investing good money after bad and are leaving this business. The majority of their drilling fleets have also been heavily cannibalized of many critical parts so that a small core group of rigs can continue to work. For the offshore drilling contractors, the decade has been less severe because the downturn did not start to reach a crisis stage until 1985. Geographical pockets of prosperity remained even during the worst times. Also, many regional markets quickly recovered from their lows during 1986-87. Today, a handful of regional markets are nearing all-time peaks in both rig utilization and day rates

  19. Emergency preparedness for the small oilfield contractor

    International Nuclear Information System (INIS)

    The changes in the oil and gas industry have been dramatic in recent years. Operators have consolidated field office facilities and downsized staffing at many of their remaining facilities. As a result of these changes, operators are turning to independent contractors as a method of controlling both peak personnel demands and selected production functions. With these changes in the business environment, the role of the specialized contractor has been greatly expanded. Tasks once performed by operator employees are now ongoing services provided by the contractor. Their performance can often be exemplary until a major emergency occurs. Emergency response can no longer be considered a secondary issue. Every contractor, small or large, must be equally prepared for an emergency. Their ability to address emergency incidents will have a direct effect in their success. This paper is a presentation of the actual learning experiences of one oilfield contractor confronted with the task of emergency preparedness, more specifically a small contractor. For the purposes of this discussion, a small contractor is one that employs one, a handful, or more individuals. These employees might singularly or collectively float between sites or anchor one site. Operating sites might be localized or spread over a vast geographical area. Because of the uniqueness of their situation, direct supervision may be minimal, shouldering greater responsibilities and authority on the employees

  20. Appeals - Redetermination by a Medicare Contractor

    Data.gov (United States)

    U.S. Department of Health & Human Services — A redetermination is an examination of a claim by the fiscal intermediary (FI), carrier, or Medicare Administrative Contractor (MAC) personnel who are different...

  1. Contractor and government - Teamwork and commitment

    Science.gov (United States)

    Griffin, G. D.

    1985-01-01

    Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

  2. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  3. Creating successful US client-contractor relations

    International Nuclear Information System (INIS)

    The recent growth in nuclear facility decommissioning worldwide has generated renewed interest in the client-contractor relationship and how best to plan and contract the work. What roles should the client -usually the owner utility - and the prime contractor and subcontractors play, and which basic planning tools, contract types, work scope changes, worker productivity factors and monitoring methods are needed to ensure the work is performed satisfactorily? (UK)

  4. CPECC Listed in World's Top International Contractors

    Institute of Scientific and Technical Information of China (English)

    Han Xiaoju; Wang Zhen; Liu Fuxin

    2006-01-01

    @@ With great efforts for many years, China Petroleum Engineering & Construction (Group) Corporation (CPECC) has become an international contractor, mainly engaged in contracting international projects. It has accumulatively fulfilled a contract value of US$2.363billion in Sudan, Pakistan, Kazakhstan, Algeria, Venezuela and Syria and other countries and regions worldwide and has been repeatedly listed amongst the World's Top 225 International Contractors so far.

  5. Red flags in prospective contractors' financial statements.

    OpenAIRE

    Lee, Man-ying, Nicole

    1992-01-01

    Approved for public release; distribution is unlimited. This thesis attempts to identify warning signals in the contractors financial statement, or 'red flags', which may be used to identify those prospective contractors who are likely to become delinquent in the performance of their contracts. A 'red flags' list compiled from the current literature was sent to financial analysts in the thirty-eight Financial Service Branches, Defense Contract Management Command Area Offices(FSDCMAOs) to d...

  6. Information technology boosts contractor's economic success

    International Nuclear Information System (INIS)

    This article will discuss the advantages of Information Technology (IT) and how one drilling contractor, Global Marine, has applied this technology. The company has applied it in an efficient manner which has provided business benefits and cost reductions that have helped its operations be more successful. The following are the different aspects of information technology that led to the contractor's success: cost reduction measures; migration to a client/server IT infrastructure; IT business benefits; and keys to obtaining business benefits from IT

  7. Environmental liability and the independent contractor

    International Nuclear Information System (INIS)

    The provisions of the Environmental Protection and Enhancement Act (EPEA) regarding the relationship between a company and an independent contractor were reviewed. The EPEA was introduced in September 1993 and significantly altered the environmental laws in the province of Alberta. The provisions of the EPEA that apply to the petroleum industry are conservation and reclamation as well as provisions concerning release of substances, contaminated sites and penalties. Companies that pollute may be held liable for reclamation, even if the work was carried out by an independent contractor and despite the fact that the independent contractor is not an employee of the company. Under the current EPEA laws, companies may not be able to effectively shift responsibility for environmental liabilities to independent contractors even where the contractor was negligent. This paper presented suggestions regarding contractor agreements and due diligence to help minimize the risk of liability to companies. The paper also discussed the following two types of liabilities under the EPEA's harmful substances section: (1) the obligation to clean up an affected area, and (2) fines and penalties that may be imposed when an offence is committed

  8. Capital Budgeting Evaluation Practices of Building Contractors in Hong Kong

    Directory of Open Access Journals (Sweden)

    K.C Lam

    2012-11-01

    Full Text Available This paper reports the results of an investigation into capital budgeting evaluation practicesin the construction industry of Hong Kong. The aim of this study was to identify thepopularity and extent of usage of various techniques for capital budget evaluation, investmentappraisal, risk analysis, and management science. The current study was comparedwith a similar survey conducted in 1994 to establish the changes in the capital budgetingevaluation practices of contracting firms over time. The results indicate that there was ageneral increase in the popularity and extent of usage in certain capital budget evaluationtechniques such as “best/worst estimate” and “formal financial evaluation”. In addition,the evaluation techniques examined were fitted into a discriminant function analysis (DFA,and a model has been developed which allows contracting firms to be classified accordingto their predominant characteristics in capital budget evaluation.

  9. Hand in Glove? Small Building Contractors, Mobile Technology and Innovation

    DEFF Research Database (Denmark)

    Buser, Martine; Koch, Christian; Tambo, Torben

    2010-01-01

    technologies and wireless communication; prices of powerful laptops, pocketpc, smart phones, blackberry's and PDA's continue to drop and their functionality approaches the computing power of laptops. Moreover those generic technologies have become commonly used. By the end of 2005, there were more mobile...... phones in use in Denmark, than inhabitants. Also the statistics on internet broadband access show that Denmark in general is one of the most informatized societies in Europe. This could provide a positive background for new systems in construction as well. Parallel to generic technologies, a few...

  10. Capital Budgeting Evaluation Practices of Building Contractors in Hong Kong

    OpenAIRE

    Lam, K.C; S.O Cheung; Tang, C M; Ng, S. T.

    2012-01-01

    This paper reports the results of an investigation into capital budgeting evaluation practicesin the construction industry of Hong Kong. The aim of this study was to identify thepopularity and extent of usage of various techniques for capital budget evaluation, investmentappraisal, risk analysis, and management science. The current study was comparedwith a similar survey conducted in 1994 to establish the changes in the capital budgetingevaluation practices of contracting firms over time. The...

  11. Protocol for the building construction process with regard to the implementation trajectory protocols EWN and EUN. Manual for commissioners, contractors, building management offices and energy efficiency standard advisors; Handleiding opnameprotocollen EWN en EUN. Voor opdrachtgevers, aannemers, bouwmanagementbureaus en EPN-adviseurs

    Energy Technology Data Exchange (ETDEWEB)

    Neeleman, J. [DWA installatie- en energieadvies, Duitslandweg 4, Postbus 274, 2410 AG Bodegraven (Netherlands)

    2013-04-15

    In the year 2012 it was foreseen to base the energy label for new buildings on the Energy Efficiency Coefficient (EPC in Dutch). This is a protocol for residential and utility buildings, with the aim to check whether and to what extent buildings were constructed according the EPC and to determine the realized EPC. In order to gain experience with the new protocols and the voluntary ventilation test the Protocol for the Energy Label for New Houses (EWN in Dutch) and the Protocol for the Energy Label for New Utility Buildings (EUN in Dutch) were conducted in 12 newly built housing projects and 5 projects in the utility building sector. With this manual you can realize energy efficient houses and/or utility buildings that meet the standards [Dutch] In het jaar 2012 was voorzien om het nieuwbouwlabel te baseren op de EPC (Energie Prestatie Coefficient). Hiervoor is een opnameprotocol opgesteld voor de woningbouw en de utiliteitsbouw, met als doel te controleren of en in hoeverre conform de EPC is gebouwd en om de gerealiseerde EPC te bepalen. Om ervaring op te doen met de nieuwe opnameprotocollen en de vrijwillige ventilatietoets werden het Opnameprotocol Energielabel Woningen Nieuwbouw (EWN) en Opnameprotocol Energielabel Utiliteitsgebouwen Nieuwbouw (EUN) uitgevoerd bij 12 nieuwbouwprojecten in de woningbouw en 5 projecten in de utiliteitsbouw. Met deze handleiding realiseert u energiezuinige woningen en/of utiliteitsgebouwen die aan de verwachtingen voldoen.

  12. 48 CFR 52.247-28 - Contractor's Invoices.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed...

  13. IT-investigation in the building construction industry

    DEFF Research Database (Denmark)

    Sørensen, Lars Schiøtt

    1995-01-01

    An investigation of the level of computing in the Danish construction industry. A quantitative and qualitative level was stated among architects, engineers, building owners, contractors a.o. use of computing......An investigation of the level of computing in the Danish construction industry. A quantitative and qualitative level was stated among architects, engineers, building owners, contractors a.o. use of computing...

  14. Accounting for settlements with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Svetlana Mullinova

    2015-06-01

    Full Text Available The paper shows that the organization of effective analytical support on management of receivables leads to improved financial results of economic entities. The author presents the results of the economic study of financial and economic activities and accounting for payments to suppliers and contractors in the agricultural organization.

  15. Improving UK client-contractor relations

    International Nuclear Information System (INIS)

    The client's aim in any decommissioning project is that the originally intended end point is achieved, within budget and on time. The contractor's aim is to have a satisfied client, so that both are happy to work together again, and to have a reasonable return for his efforts. How can these - not incompatible - aims best be achieved? (UK)

  16. ROTATING BIOLOGICAL CONTRACTORS - HYDRAULIC VERSUS ORGANIC LOADING

    Science.gov (United States)

    Conventional and alternative flow configurations of rotating biological contractors were compared for soluble organic carbon and ammonia-nitrogen removal. Each treatment train contained eight shafts with a cumulative surface area of 800,000 ft sq. The hydraulic bay used the conve...

  17. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  18. 48 CFR 1845.7210 - Contractor utilization of Government property.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor utilization of Government property. 1845.7210 Section 1845.7210 Federal Acquisition Regulations System NATIONAL AERONAUTICS....7210 Contractor utilization of Government property....

  19. 48 CFR 2452.251-70 - Contractor employee travel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT...

  20. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  1. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  2. Needs of Non-Energy Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liakus, C. [Building Media and the Building America Retrofit Alliance (BARA), Wilmington, DE (United States)

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  3. Needs of Non Energy-Focused Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  4. Chain collaboration between an housing corporation and two general contractors, the first steps

    OpenAIRE

    Koolwijk, J.S.J.

    2011-01-01

    Several housing corporations in the Netherlands have realized they cannot do it alone if they want to renovate their housing stock faster, cheaper and with a higher quality. More and more of these corporations are forming strategic alliances with contractors and other partners to reach these goals. They are applying principles of supply chain integration and lean on the total process of the building lifecycle, under the umbrella concept of Chain Collaboration (Ketensamenwerking in Dutch). Thi...

  5. Tank waste remediation system (TWRS) privatization contractor samples waste envelope D material 241-C-106

    Energy Technology Data Exchange (ETDEWEB)

    Esch, R.A.

    1997-04-14

    This report represents the Final Analytical Report on Tank Waste Remediation System (TWRS) Privatization Contractor Samples for Waste Envelope D. All work was conducted in accordance with ''Addendum 1 of the Letter of Instruction (LOI) for TWRS Privatization Contractor Samples Addressing Waste Envelope D Materials - Revision 0, Revision 1, and Revision 2.'' (Jones 1996, Wiemers 1996a, Wiemers 1996b) Tank 241-C-1 06 (C-106) was selected by TWRS Privatization for the Part 1A Envelope D high-level waste demonstration. Twenty bottles of Tank C-106 material were collected by Westinghouse Hanford Company using a grab sampling technique and transferred to the 325 building for processing by the Pacific Northwest National Laboratory (PNNL). At the 325 building, the contents of the twenty bottles were combined into a single Initial Composite Material. This composite was subsampled for the laboratory-scale screening test and characterization testing, and the remainder was transferred to the 324 building for bench-scale preparation of the Privatization Contractor samples.

  6. A feasibility study for using agile contractors to promote mass housing contractors

    Directory of Open Access Journals (Sweden)

    Faraz Pouyandeh

    2015-06-01

    Full Text Available During the past few years, there have been growing changes on managing different projects using the idea of agile manufacturing by moving from the idea of plan to planning. This paper presents an empirical investigation to study whether it is possible to apply the idea of agile in mass construction projects in Iran. The study designs a questionnaire in Likert scale and distributes it among 35 well-known contractors in the field of construction projects. The questionnaire consists of 8 questions, which is considered in terms of four perspectives including culture, projects, tools and processes and employee. Using some statistical test, the study has determined that it would be possible to apply the idea of agile contractors to promote mass housing contractors.

  7. Energy Renovations: Volume 17: Insulation - A Guide for Contractors to Share with Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.; Adams, Karen; Hefty, Marye G.; Gilbride, Theresa L.; Love, Pat M.

    2012-05-15

    This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various insulation options for improving the energy performance and comfort of existing homes. The report provides descriptions of many common insulation types, including their advantages and disadvantages, R-values, characteristics, and typical uses. The report also describes potentially hazardous products such as asbestos and formaldehyde and safety issues when conducting energy-efficient upgrades including radon. The guide is available for download at the DOE Building America website, www.buildingamerica.gov.

  8. CERN's newest building

    CERN Multimedia

    Anaïs Vernède

    2011-01-01

    With a growing number of users looking for offices, the shortage of space has become acute, particularly for physicists. Building 42, inaugurated on Friday 11 February, offers almost 300 new work-spaces and a particularly pleasant working environment.   Mauro Dell’Ambrogio, the Swiss State Secretary for Education and Research (left), Rolf Heuer , CERN Director-General (centre), and Mark Muller, President of the Government of the Republic and Canton of Geneva and Head of the Department of Construction and Information Technology (right) at the opening of Building 42 on 11 February, 2011.   Construction work for the new Building 42 began in January 2009, thanks to support from the Swiss foundation FIPOI (Fondation des immeubles pour les organisations internationales). After two years of work, the building, an extension of Building 40, is ready to accommodate physicists from around the world who have come to work on the LHC. "We had more than 25 external contractors working...

  9. Flow metering concepts, an engineering contractors experience

    Energy Technology Data Exchange (ETDEWEB)

    Brunborg, Lars; Daler, Dag [Kvaerner Oil and Gas (Norway)

    1997-07-01

    We will give a brief discussion of an engineering company's experience regarding fiscal measurement systems. This will be seen in relationship to the use of NORSOK standards versus functional and detailed specifications, and simplified and cost efficient concepts. The constraints on the design are also commented on, and the influence of these constraints on layout, maintainability and operability. Further a brief review of the computer concepts available, including integration with DCS. Finally we will review the relationships between Supplier - Engineering Contractor -Operator, seen in relationship to integrated teams, frame agreements, etc. (author)

  10. NCON: A tensor network contractor for MATLAB

    CERN Document Server

    Pfeifer, Robert N C; Singh, Sukhwinder; Vidal, Guifre

    2014-01-01

    A fundamental process in the implementation of any numerical tensor network algorithm is that of contracting a tensor network. In this process, a network made up of multiple tensors connected by summed indices is reduced to a single tensor or a number by evaluating the index sums. This article presents a MATLAB function ncon(), or "Network CONtractor", which accepts as its input a tensor network and a contraction sequence describing how this network may be reduced to a single tensor or number. As its output it returns that single tensor or number. The function ncon() may be obtained by downloading the source of this preprint.

  11. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Science.gov (United States)

    2010-10-01

    ... commensurate with contingent import tax and duty-free liability. This bank guaranty or fund shall not be released to the Contractor until the Spanish General Directorate of Customs verifies the accounting, export... DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION...

  12. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  13. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  14. TECHNICAL AND ECONOMICAL ANALYSIS OF LOGGING CONTRACTORS

    Directory of Open Access Journals (Sweden)

    Abilio Donizetti de Morais Filho

    2009-09-01

    Full Text Available The objective of this study was to describe the financial conditions of forestry contractors, concerning life quality aspects, condition of work and equipments, operational costs, and economic credit to invest in new technologies. Five companies had been analyzed, with an annual income between US$ 400,000.00 and US$ 1,720,000.00, with an average of US$ 950,000.00. The number of employees varied between 33 and 181, and the companies were classified in terms of size as: one small, two average, and two big. The main difficulties to invest in new machines were high financial taxes, more than 12% an year, and a lack of long term contracts to guarantee the payment capability. It was observed that the contractors did not consider the capital remuneration and a correct depreciation of machines, resulting in an average machine life higher than 10 years. The final conclusions were that the costs were above the paid values for the services, when computed the depreciation and capital remuneration, with negative results in the financial analyzes of three companies. Finally, the mechanization process increased the workers life quality, however, the annual income was around US$ 2,112.00 per worker, approximately 39% lower than the average Brazilian population.

  15. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  16. Health and Safety Guide for Home Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Stratton, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Walker, Iain S. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-02-15

    This report is intended to provide home performance contractor trainers with a resource to keep both their workers and home residents safe and healthy. This document is an attempt to describe what we currently believe is safe, what we believe is unsafe, and what we’re unsure about. It is intended to identify health and safety issues and provide historical context and current understanding of both risks and mitigation strategies. In addition, it provides links to more in-depth resources for each issue. When we tighten the thermal envelope of a house to improve comfort and reduce energy use, we have to be sure that we are not compromising the indoor air quality of the home. This means identifying and mitigating or eliminating pollution sources before and after you make changes to the home. These sources can include materials and finishes in the home, exhaust gasses from combustion appliances, soil gasses such as radon, and moisture from a bathroom, kitchen, or unvented clothes dryer. Our first responsibility is to do no harm — this applies both to our clients and to our employees. Currently, there are many new products that are widely used but whose health effects are not well understood. Our in ability to have perfect information means the directive to do no harm can be difficult to obey. Each home is a little bit different, and in the face of a situation you’ve never encountered, it’s important to have a solid grasp of the fundamental concepts of building science when the hard and fast rules don’t apply . The home performance industry is gaining momentum, and has the potential to expand greatly as energy costs continue to rise. It is imperative that we remain vigilant about protecting the health and safety of our workers and our customers. It only takes a few news stories about a family that got sick after their home was tightened by a home performance contractor to scare off potential customers and taint the reputation of the entire industry. Good

  17. The contractor`s role in low-level waste disposal facility application review and licensing

    Energy Technology Data Exchange (ETDEWEB)

    Serie, P.J.; Dressen, A.L. [Environmental Issues Management, Inc., Seattle, WA (United States)

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department in a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.

  18. Federal tax compliance: implications for contractor responsibility determinations

    OpenAIRE

    Rendon, Juanita M.; Rendon, Rene G.

    2006-01-01

    The Federal Acquisition Regulation (FAR) states that no contract award shall be made unless the contracting officer makes an affirmative determination of the contractor's responsibility. Two aspects of determining responsibility include the contractor's financial resources and record of integrity and business ethics. Recent reports from the Governement Accountability Office (GAO) indicate that many federal contractors are not complying with federal tax compliance requirements and are abusin...

  19. Guide for performance of DOE contractor procurement system reviews (CPSR)

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-01

    The purpose of this CPSR Guide is to establish uniform procedures for the performance of reviews of contractor procurement systems required by DOE Procurement Regulation 9-23, 9-50, and 9-51. These procedures will enable DOE to evaluate contractor procurement systems to determine if they are adequate to support a surveillance monitoring system rather than the existing system of prior approval of individual procurements at specific dollar levels, assist the contractor in optimizing its effectiveness and efficiency, and be assured of contractor compliance with applicable procurement policies and procedures by follow-up surveillance on a periodic basis. (RWR)

  20. Contractor and Government: Teamwork and Commitment

    Science.gov (United States)

    Griffin, Gerald D.

    1984-01-01

    The assigned topic, "Contractor and Government: Teamwork and Commitment," is a subject about vitally interested. The successes of the U.S. space program were built on such teamwork and commitment. It seems only a short time ago that man's role in space was an unknown quantity. In rapid succession, however, the flights of Shepard, Glenn, and Armstrong demonstrated man's capability to live and travel in space. Consequently, we no longer live with the same awe of space. The success of these joint industry-NASA efforts in achieving our Nation's space goals testifies to the validity of our team's past commitment, management expertise, communications techniques, and teamwork over a period of 25 years. Today, however, We are at the beginning of a new era in space.

  1. Rosneftegazstroy - Russia's premier oil and gas contractor

    International Nuclear Information System (INIS)

    This special Petroleum Economist Sponsored Supplement looks at the present condition and future prospects of the Russian oil and gas industry. Russia's chief oil and gas contractor, Rosneftegazstroy, a joint stock company formed in 1991, took over from the former Soviet Union's Ministry of Oil and Gas Construction and from Neftegazstroy, the State concern. Responsible for the exploration and exploitation of the country's huge oil and gas reserves, Rosneftegazstroy has a mammoth task ahead to modernize and create an adequate infrastructure for its new commercial basis. Its foreign investment projects are described and plans for rebuilding and new developments are discussed. Russia's fuel and energy industries now show clear signs of increasing activity, amid a backdrop of falling production overall. (UK)

  2. Contingency Contractor Optimization Phase 3 Sustainment Requirements Document Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa; Durfee, Justin David; Frazier, Christopher Rawls; Jones, Katherine A; Gearhart, Jared Lee

    2016-05-01

    This requirements document serves as an addendum to the Contingency Contractor Optimization Phase 2, Requirements Document [1] and Phase 3 Requirements Document [2]. The Phase 2 Requirements document focused on the high-level requirements for the tool. The Phase 3 Requirements document provided more detailed requirements to which the engineering prototype was built in Phase 3. This document will provide detailed requirements for features and enhancements being added to the production pilot in the Phase 3 Sustainment.

  3. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Science.gov (United States)

    2010-10-01

    ... personnel. 2452.237-75 Section 2452.237-75 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General....

  4. 48 CFR 36.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION...

  5. 48 CFR 2936.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 2936.201 Section 2936.201 Federal Acquisition Regulations System DEPARTMENT OF LABOR...

  6. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing system. 970.4402 Section 970.4402 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor...

  7. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the... secret in the interest of national defense or foreign policy. b. Work under this contract may involve... ensure that contractor employees are: (1) Citizens of the United States of America or an alien who...

  8. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Science.gov (United States)

    2010-10-01

    ... Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance Evaluation. 8.406-7 Section 8.406-7 Federal Acquisition Regulations System FEDERAL ACQUISITION...

  9. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ... contractors have implemented the mandatory contractor business ethics program requirements. DATES: Effective... FAR 52.203-13, Contractor Code of Business Ethics and Conduct. This final rule modifies FAR 42.302... ensure that contractors have implemented the mandatory contractor business ethics program requirements...

  10. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  11. Assuring the competence of nuclear power plant contractor personnel

    International Nuclear Information System (INIS)

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  12. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ... Regulation; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of...

  13. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-06-27

    ... Regulation; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure... requirement concerning contractor business ethics compliance program and disclosure requirements. Public... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure...

  14. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    . However, it seems that the managers with business administration competencies are rarely those with responsibility for the central tasks of leadership and strategy. Moreover, very few companies prioritize operations strategy and IT. It is assumed that everybody knows about practical building projects, and...

  15. Contingency contractor optimization. phase 3, model description and formulation.

    Energy Technology Data Exchange (ETDEWEB)

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Detry, Richard Joseph; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Nanco, Alan Stewart; Nozick, Linda Karen

    2013-06-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  16. Contingency contractor optimization. Phase 3, model description and formulation.

    Energy Technology Data Exchange (ETDEWEB)

    Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Detry, Richard Joseph; Nanco, Alan Stewart; Nozick, Linda Karen [Cornell University

    2013-10-01

    The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

  17. Exposing government response action contractors to environmental tort liability

    International Nuclear Information System (INIS)

    Government contractors, particularly those involved with hazardous waste response action activities, are encountering increased risks for environmental tort liabilities. Contracts often include tasks and work assignments requiring the management of industrial, chemical, nuclear or mining wastes, spent fuels, munitions or other toxic substances. Contractors exposure to liability for damages results directly from the environmental laws and regulations pursuant to which the Government has contracted them to respond. Additionally, contractors may be exposed to common law liability under such dogmas as nuisance, trespass and strict liability in tort

  18. Authorization basis for the 209-E Building

    International Nuclear Information System (INIS)

    This Authorization Basis document is one of three documents that constitute the Authorization Basis for the 209-E Building. Per the U.S. Department of Energy, Richland Operations Office (RL) letter 98-WSD-074, this document, the 209-E Building Preliminary Hazards Analysis (WHC-SD-WM-TI-789), and the 209-E Building Safety Evaluation Report (97-WSD-074) constitute the Authorization Basis for the 209-E Building. This Authorization Basis and the associated controls and safety programs will remain in place until safety documentation addressing deactivation of the 209-E Building is developed by the contractor and approved by RL

  19. 23 CFR 646.105 - Contractor's public liability and property damage insurance.

    Science.gov (United States)

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS RAILROADS Railroad-Highway Insurance Protection § 646.105 Contractor's... insurance protection in his own behalf under contractor's public liability and property damage...

  20. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ... SPACE ADMINISTRATION Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION: Notice of information collection. SUMMARY: The National Aeronautics and Space Administration, as part of its continuing effort to...

  1. Highway vehicle systems contractors coordination meeting. Seventeenth summary report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Separate abstracts was prepared for each of the 62 papers presented at the Contractors' Coordination meeting on highway vehicle systems. One paper had previously appeared in DOE's data base.

  2. 2005 River Corridor Cleanup Contractor Revegetation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    A. L. Johnson

    2005-09-12

    This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

  3. 48 CFR 253.209-1 - Responsible prospective contractors.

    Science.gov (United States)

    2010-10-01

    ... obtain needed facilities, equipment, materials, etc. (E) Accounting system and related internal controls... an accounting system review when soliciting and awarding cost-reimbursement or incentive type... contractor's key management personnel to determine if they have the basic technical knowledge,...

  4. The Excessive Profits of Defense Contractors: Evidence and Determinants

    OpenAIRE

    Wang, Chong; Miguel, Joseph San

    2012-01-01

    A long controversial issue that divides academics, government officials, elected representatives, and the U.S. defense industry is whether defense contractors earn abnormal or excessive profits at the expense of taxpayers. Using an innovative industry-year-size matched measure of excessive profit, we demonstrate three findings. First, when compared with their industry peers, defense contractors earn excessive profits. This result is evident when profit is measured by Return ...

  5. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  6. On the Appropriateness of Contractor-Led Procurement

    OpenAIRE

    Winter, Christoph Hans Heinrich

    2009-01-01

    Major clients of the construction industry have been found to organise construction work into fewer, but larger, contracts with more transfer of risk and responsibilities in response to a change from a sellers market to a buyers market, and facing a greater choice of procurement methods than ever before. Main contractors and consultants alike are moving towards multidisciplinary teams offering design and management services, challenging single service consultants or contractors and are in com...

  7. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  8. Measure Guideline: Air Sealing Attics in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Otis, C.; Maxwell, S.

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.

  9. Measure Guideline. Air Sealing Attics in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Otis, Casey [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States); Maxwell, Sean [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States)

    2012-06-01

    This Building America Measure Guideline is intended for owners, builders, contractors, homeowners, and other stakeholders in the multifamily building industry, and focuses on challenges found in existing buildings for a variety of housing types. It explains why air sealing is desirable, explores related health and safety issues, and identifies common air leakage points in multifamily building attics. In addition, it also gives an overview of materials and techniques typically used to perform air sealing work.

  10. Research on the Effectiveness of Organization Interface Management of Construction Contractors Based on the EPC Model during Building Long-Distance Pipeline%EPC模式下管道施工商组织界面管理有效性研究

    Institute of Scientific and Technical Information of China (English)

    杨伟杰; 廉金麟; 刘小康

    2012-01-01

    Delphi method is used to establish the EPC mode pipeline construction organization interface effectiveness evaluation index system formed by goal of cognition, organizational culture, organizational structure, information communication, entity and interface contract as the main indicator. By applying the analytic hierarchy process and fuzzy comprehensive evaluation method for quantitative analysis and evaluation of construction organization interface management situation, proposals are put forward to EPC construction contractors of enhancing and raising the overall level of organization interface management : firstly, EPC construction should improve the organization, clarifying stakeholder parties responsibilities ; secondly, establishing information-processing institutions, constructing the channel type project communication channels; thirdly, perfecting the construction organization plan, dynamic optimized configuration of resources; fourthly, reducing the internal transaction cost and efficiency loss; finally, taking into consideration the economic, social and environmental influence, carrying out comprehensive evaluation of project evaluation and continuity.%借助德尔菲法建立以目标认知、组织文化、组织结构、信息沟通、实体与合同界面为主要指标的EPC模式下管道施工商组织界面有效性评价指标体系,并运用层次分析法和模糊综合评价法量化分析与评价施工商组织界面管理情况可知,要全面提升组织界面管理水平。EPC施工商应完善组织机构、明晰利益相关者各方职责,建立信息处理机构、构建全通道型项目沟通渠道,完善施工组织方案、动态优化配置资源,减少组织内部界面效率损耗、降低内部交易成本,统筹考虑经济社会环境影响.全方位开展项目后评价以及持续性评价。

  11. 77 FR 50449 - Revision of Department of Homeland Security Acquisition Regulation; Contractor Billing and...

    Science.gov (United States)

    2012-08-21

    ... Regulation; Contractor Billing and Subcontractor Labor Hour Rates Under Time and Materials Contracts (HSAR... requirement for consistent practices for contractor labor hour records and labor hour billing. The first of... consistency between contractor recordkeeping and contractor proposal and billing practices. The proposed...

  12. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  13. Steam Balancing and Tuning for Multifamily Residential Buildings in Chicagoland

    Energy Technology Data Exchange (ETDEWEB)

    Choi, J.; Ludwig, P.; Brand, L.

    2012-08-01

    Older heating systems often suffer from mis-investment--multiple contractors upgrading parts of systems in inadequate or inappropriate ways that reduce system functionality and efficiency--or from a lack of proper maintenance. This technical report addresses these barriers to information, contractor resources, and cost-savings. Building off of previous research, CNT Energy conducted a study to identify best practices for the methodology, typical costs, and energy savings associated with steam; system balancing.

  14. Exploration of Team Integration in Spanish Multifamily Residential Building Construction

    OpenAIRE

    Pellicer, Eugenio; Sanz Benlloch, María Amalia; Esmaeili, B.; MOLENAAR, KEITH ROBERT

    2016-01-01

    Project delivery team integration generally involves early involvement of general contractors and key specialty contractors in the design process. Team integration has been found to improve an owner’s probability of success. However, during difficult economic times, owners can forego early team involvement and move toward low bid procurement to take advantage of competitive markets. This study explores the performance of integrated teams in the Spanish multifamily building constructi...

  15. Credit Assessment of Contractors: A Rough Set Method

    Institute of Scientific and Technical Information of China (English)

    LIU Gaojun; ZHU Yan

    2006-01-01

    A rough set method is presented in this paper to assess the credit of contractors. Unlike traditional methods, the rough set method deduces credit-classifying rules from actual data to predict new cases. The method uses a contractors' database with a genetic algorithm and an exhaustive reduction implemented using ROSETTA software that integrates rough set method. The classification accuracy of the rough set model is not as good as that of a decision tree, logistic regression, and neural network models, but the rough set model more accurately predicts contractors with bad credit. The results show that the rough set model is especially useful for detecting corporations with bad credit in the currently disordered Chinese construction market.

  16. Digital Handover of Data from Building Projects to Building Operation

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    and construction and on the other side in building opera-tion and facilities management. In Denmark the government has launched a development program called Digital Construction and one of the projects concerns specifying require-ments for building clients in relation to digital handover of data from construction...... pro-jects to building operation. This project started in 2004 with research and analyses fol-lowed by development of a proposal for client requirements and in 2005 a first test on a real construction project has been carried out. After revision of the requirements a second test will be started early...... by a consortium called DACaPo consisting of a building client/facilities manager, a consulting company, a contractor and a university institute. This paper presents some of the results from the project with the main focus on the initial research....

  17. Canadian Association of Oilwell Drilling Contractors: energy efficiency study

    International Nuclear Information System (INIS)

    The reported study is based on updated survey data collected from seven of the eight drilling contractors who participated in an original study and three service rig contractors. The aim of the study was show that the trend toward increased energy efficiency and overall reduction in energy intensity is continuing in the drilling and well servicing industries, and that this process is a function of technology availability and capital replacement. A comparison is made of the change in fuel efficiency of contractor's diesel engines by comparing the average fuel consumption of an inventory of engines owned by the eight drilling contractors and three service rig contractors between 1995 and 1998. The results are compiled separately for the two contractor types. For each group, the results are on a net basis, in that the net change in the amount of a particular engine variety is aggregated into one of two categories: added or deleted. Based on on an evaluation of the data gathered in the study, it is clearly evident that there occurred at substantial reduction in energy intensity in drilling and well servicing operations in the 3 years considered. Based on the data from the drilling rigs, it should be noted that the reductions in energy intensity and fuel usage are in addition to the 29.4% reduction in the years 1991-95 recorded in the 1995 energy efficiency study. It ought to be noted also that the turnover and replacements of older, less efficient rig engines with newer, more efficient ones was not a consequence of any distortionary tax and fiscal measures, but rather a natural process of capital reinvestment and technological improvement

  18. 309 Building fire protection analysis and justification for deactivation of sprinkler system. Revision 1

    International Nuclear Information System (INIS)

    Provide a 'graded approach' fire evaluation in preparation for turnover to Environmental Restoration Contractor for D and D. Scope includes revising 309 Building book value and evaluating fire hazards, radiological and toxicological releases, and life safety issues

  19. 309 Building fire protection analysis and justification for deactivation of sprinkler system. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Conner, R.P.

    1997-06-25

    Provide a `graded approach` fire evaluation in preparation for turnover to Environmental Restoration Contractor for D&D. Scope includes revising 309 Building book value and evaluating fire hazards, radiological and toxicological releases, and life safety issues.

  20. Supporting contractors' bidding decision: RBF neural networks application

    Science.gov (United States)

    Leśniak, Agnieszka

    2016-06-01

    A bidding decision, despite its being important for the contractor, often needs to be made quickly and within a limited timeframe. To facilitate the contractor's reasoning by limiting randomness that may lead to mistakes decision support models are frequently applied. This paper presents possible applications of an Artificial Neural Network (ANN) to support bidding decisions. The proposed model involving networks with radial basis functions (RBF) was to perform a classification task. On the basis of a set of input data, the network was to suggest either participation in the bid or resignation from it. The results, 93% of correctly classified cases, confirmed the usability of RBF network in solving the problem.

  1. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key...

  2. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  3. 'The crab', a new cryo magnet transport vehicle, in action in building SMA18

    CERN Multimedia

    2006-01-01

    The crab is used to transport LHC cryo-magnets and their components in the assembly and preparation building, SMA18, and test building, SM18. It has many capabilities that allow CERN staff and contractors transport magnets between the two buildings and to locate them in the right position on the test beds.

  4. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Science.gov (United States)

    2010-10-01

    ... any information regarding subcontracts, key personnel, and customer satisfaction; (4) Assign a... evaluations (if any), and provide any information regarding subcontracts, key personnel, and customer satisfaction; and (5) Forward the Report to the contractor within ten (10) business days after the...

  5. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  6. 75 FR 69037 - Medicaid Program; Recovery Audit Contractors

    Science.gov (United States)

    2010-11-10

    ..., therapists, and certified coders upon request; manage quality assurance procedures; and maintain... amends section 1902(a)(42) of the Act, which requires States to make the following assurances to CMS...; Recovery Audit Contractors AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION:...

  7. Technical Baseline Summary Description for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford

  8. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2012-01-24

    ... Employment and Training Administration Guam Military Base Realignment Contractor Recruitment Standards AGENCY... (Department) Employment and Training Administration (ETA) is issuing this notice to announce the recruitment..., and Puerto Rico, according to the terms of a recruitment plan developed and approved by the...

  9. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2013-01-08

    ... recruitment standards in the Federal Register on January 24, 2012 (77 FR 3503). This Final Notice has made... Employment and Training Administration Guam Military Base Realignment Contractor Recruitment Standards AGENCY... (Department) Employment and Training Administration (ETA) is issuing this notice to announce...

  10. Radiation exposures for DOE and DOE contractor employees, 1987

    International Nuclear Information System (INIS)

    This report is one of series of annual reports provided by the US Department of Energy (DOE) summarizing occupational radiation exposures received by DOE and DOE contractor employees. These reports provide an overview of radiation exposures received each year, as well as identification of trends in exposures being experienced over the years. 5 figs., 30 tabs

  11. 48 CFR 236.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTS Special Aspects of Contracting for Construction 236.201 Evaluation of contractor performance. (a) Preparation of performance evaluation reports. Use DD Form 2626, Performance Evaluation (Construction... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Evaluation of...

  12. 48 CFR 436.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... Construction 436.201 Evaluation of contractor performance. Preparation of performance evaluation reports. In addition to the requirements of FAR 36.201, performance evaluation reports shall be prepared for indefinite... of services to be ordered exceeds $500,000.00. For these contracts, performance evaluation...

  13. 48 CFR 3036.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ...) 48 CFR 36.201. Access to reports is through the CPS or the government-wide system, Past Performance... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND...

  14. 49 CFR 633.17 - PMO contractor eligibility.

    Science.gov (United States)

    2010-10-01

    ... regulations, found at 48 CFR CH I. ... 49 Transportation 7 2010-10-01 2010-10-01 false PMO contractor eligibility. 633.17 Section 633.17..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.17...

  15. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Science.gov (United States)

    2012-02-09

    ... as ensure the use of contracting best practices as established by the Federal Acquisition Regulations... contracting best practices as established by the Federal Acquisition Regulations and other applicable sources.... SUMMARY: This rule establishes standards of qualification and responsibility for contractors employed...

  16. 48 CFR 939.7002 - Contractor acquisition of information technology.

    Science.gov (United States)

    2010-10-01

    ... information technology. 939.7002 Section 939.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Implementing DOE Policies and Procedures 939.7002 Contractor acquisition of information technology. (a) Management and operating...

  17. DOE Human Genome Program contractor-grantee workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  18. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  19. 48 CFR 1646.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE...

  20. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2011-06-28

    ... and business ethics; and (7) Business-like concern for the interest of the customer. (b) All past... FAR Case 2006-022, Contractor Performance Information (74 FR 31557) published July 1, 2009, and FAR Case 2008-016, Termination for Default Reporting (75 FR 60258) published September 29, 2010. FAR...

  1. Radiation exposures for DOE and DOE contractor employees, 1989

    International Nuclear Information System (INIS)

    All US Department of Energy (DOE) and DOE contractors, are required to submit occupational radiation exposure records to a central depository. In 1989, data were required to be submitted for all employees who were required to be monitored in accordance with DOE Order 5480.11 and for all visitors who had a positive exposure. The data required included the external penetrating whole-body dose equivalent, the shallow dose equivalent, and a summary of internal depositions of radioactive material above specified limits. Data regarding the exposed individuals included the individual's age, sex, and occupational category. This report is a summary of the external penetrating whole-body dose equivalents and shallow dose equivalents reported by DOE and DOE contractors for the calendar year 1989. A total of 90,882 DOE and DOE contractor employees were reported to have been monitored for whole-body ionizing radiation exposure during 1989. This represents 53.6% of all DOE and DOE contractor employees and is an increase (4.3 %) from the number of monitored employees for 1988. In addition to the employees, 12,643 visitors were monitored

  2. Technical Baseline Summary Description for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI, A.R.

    2000-04-21

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford.

  3. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Other Improper Business...

  4. 32 CFR 516.21 - Litigation against government contractors.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Litigation against government contractors. 516.21 Section 516.21 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY AID OF CIVIL AUTHORITIES AND PUBLIC RELATIONS LITIGATION Reporting Legal Proceedings to HQDA § 516.21 Litigation...

  5. Energy Renovations: Volume 14: HVAC - A Guide for Contractors to Share with Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Gilbride, Theresa L.; Baechler, Michael C.; Hefty, Marye G.; Hand, James R.; Love, Pat M.

    2011-08-29

    This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various energy-efficient options for heating, cooling, and ventilating existing homes. The report provides descriptions of many common and not-so-common HVAC systems, including their advantages and disadvantages, efficiency ranges and characteristics of high-performance models, typical costs, and climate considerations. The report also provides decision trees and tables of useful information for homeowners who are making decisions about adding, replacing, or upgrading existing HVAC equipment in their homes. Information regarding home energy performance assessments (audits) and combustion safety issues when replacing HVAC equipment are also provided.

  6. Better Buildings Neighborhood Program: BetterBuildings Lowell Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Heslin, Thomas

    2014-01-31

    The City of Lowell set four goals at the beginning of the Better Buildings Neighborhood Program: 1. Improve the Downtown Historic Park District’s Carbon Footprint 2. Develop a sustainable and replicable model for energy efficiency in historic buildings 3. Create and retain jobs 4. Promote multi-stakeholder partnerships The City of Lowell, MA was awarded $5 million in May 2010 to conduct energy efficiency retrofits within the downtown National Historical Park (NHP). The City’s target was to complete retrofits in 200,000 square feet of commercial space and create 280 jobs, while adhering to the strict historical preservation regulations that govern the NHP. The development of a model for energy efficiency in historic buildings was successfully accomplished. BetterBuildings Lowell’s success in energy efficiency in historic buildings was due to the simplicity of the program. We relied strongly on the replacement of antiquated HVAC systems and air sealing and a handful of talented energy auditors and contractors. BetterBuildings Lowell was unique for the Better Buildings Neighborhood Program because it was the only program that focused solely on commercial properties. BetterBuildings Lowell did target multi-family properties, which were reported as commercial, but the majority of the building types and uses were commercial. Property types targeted were restaurants, office buildings, museums, sections of larger buildings, mixed use buildings, and multifamily buildings. This unique fabric of building type and use allows for a deeper understanding to how different properties use energy. Because of the National Historical Park designation of downtown Lowell, being able to implement energy efficiency projects within a highly regulated historical district also provided valuable research and precedent proving energy efficiency projects can be successfully completed in historical districts and historical buildings. Our program was very successful in working with the local

  7. Strengthening Building Retrofit Markets

    Energy Technology Data Exchange (ETDEWEB)

    Templeton, Mary [Michigan Saves; Jackson, Robert [Michigan Energy Office

    2014-04-15

    The Business Energy Financing (BEF) program offered commercial businesses in Michigan affordable financing options and other incentives designed to support energy efficiency improvements. We worked through partnerships with Michigan utilities, lenders, building contractors, trade associations, and other community organizations to offer competitive interest rates and flexible financing terms to support energy efficiency projects that otherwise would not have happened. The BEF program targeted the retail food market, including restaurants, grocery stores, convenience stores, and wholesale food vendors, with the goal of achieving energy efficiency retrofits for 2 percent of the target market. We offered low interest rates, flexible payments, easy applications and approval processes, and access to other incentives and rebates. Through these efforts, we sought to help customers strive for energy savings retrofits that would save 20 percent or more on their energy use. This program helped Michigan businesses reduce costs by financing energy efficient lighting, heating and cooling systems, insulation, refrigeration, equipment upgrades, and more. Businesses completed the upgrades with the help of our authorized contractors, and, through our lending partners, we provided affordable financing options.

  8. Report on audit of Department of Energy contractor occupational injury and illness reporting practices

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-07

    The Department and its contractors are responsible for ensuring that a safe and healthy work environment is provided to Department and contractor employees at its operating facilities. Contractors are responsible for establishing a comprehensive occupational safety and health program, which includes reporting of significant work-related employee injuries. The Department is responsible for monitoring the implementation of the contractor`s programs. Two performance indicators used by the Department to measure a contractor`s safety performance are the number and severity of work-related employee injuries and of lost workdays rates. The objective of the audit was to determine whether Department of Energy contractors accurately reported occupational injuries and illnesses in accordance with Departmental requirements.

  9. Government/contractor partnerships for continuous improvement. A Goddard Space Flight Center example

    Science.gov (United States)

    Tagler, Richard C.

    1992-01-01

    The efforts of a government organization and its major contractors to foster a continuous improvement environment which transcends the traditional government/contractor relationship is discussed. This relationship is aimed at communication, partnership, and trust - creating benefits for all involved.

  10. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Science.gov (United States)

    2010-07-23

    ... Federal eRulemaking portal by inputting ``Information Collection 3090-XXXX, Central Contractor... ``Search''. Select the link ``Submit a Comment'' that corresponds with ``Information Collection 3090-XXXX... ``Information Collection 3090-XXXX, Central Contractor Registration Requirements for Prime Grant Recipients''...

  11. 78 FR 71036 - Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting...

    Science.gov (United States)

    2013-11-27

    ...; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT... Operators to Report Contractor Management Information System (MIS) Data; and New Method for Operators...

  12. 48 CFR 245.7205 - Reporting excess and surplus contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... purchases or retention at cost). (3) Line 3—Insert total excess inventory reported by contractors during the... surplus contractor inventory. 245.7205 Section 245.7205 Federal Acquisition Regulations System DEFENSE... Instructions 245.7205 Reporting excess and surplus contractor inventory. (a) Contract administration...

  13. 78 FR 13394 - 30-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2013-02-27

    ... Notice of Proposed Information Collection: Office of Language Services Contractor Application Form ACTION... Language Services Contractor Application Form. OMB Control Number: 1405-0191. Type of Request: Extension of... history and legal work status in the United States. If candidates successfully become contractors for...

  14. 48 CFR 52.223-18 - Contractor Policy to Ban Text Messaging While Driving.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Policy to Ban... Text of Provisions and Clauses 52.223-18 Contractor Policy to Ban Text Messaging While Driving. As prescribed in 23.1105, insert the following clause: CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE...

  15. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) (a) The Contractor...

  16. 48 CFR 252.227-7038 - Patent Rights-Ownership by the Contractor (Large Business).

    Science.gov (United States)

    2010-10-01

    ... corporate structure of which the Contractor is a part; (B) Includes the right to grant sublicenses to the... Contractor made in the performance of work under this contract. (b) Contractor's rights—(1) Ownership. The... subject invention pursuant to an application for an exclusive license submitted in accordance with 37...

  17. Operator/contractor teamwork is the key to performance improvement

    International Nuclear Information System (INIS)

    The contract strategies developed by the two major E and P companies operating in the North Sea emphasize teamwork between operator and contractors to achieve the common goal of maximizing project value. These strategies have had significant repercussions across the whole industry. This paper compares these strategies and concludes that although they are structurally different, they have the same fundamental objectives. It describes the evolution of what these operators consider to be their core business, with the resultant changing roles for both operator and contractor staff. Several examples of results achieved through implementing these changes are described, highlighting the need for a structured performance measurement system to quantify the success of these initiatives. Finally, the potential for even greater efficiency improvements through further industry-wide cooperation is emphasized

  18. Between Fit and Misfit – Small Contractors Using Mobile Technology

    DEFF Research Database (Denmark)

    Koch, Christian; Tambo, Torben; Buser, Martine

    2010-01-01

    This paper analyzes the use of information systems with mobile computing elements in small contractors. Statistical material on ICT-developments in construction reveals a quite scattered and patterned picture of coexistence of generic and dedicated systems and considerable lagging behind other...... spanning between various location and mobilities on site, the site management office, one or more headquarters of construction firms and the mobile space of in between these multiple locations. The qualitative empirical study cover three constellations of small general and craft contractors, their mobile...... technology use and their IT-suppliers. The cases demonstrate a fit with the dedicated mobile technology, spanning all the types of mobility. The work rhythm and placement of the mobile technology with the craftsmen‟s work procedures seems to be a proper fit. Moreover, designing a system to the craftsmen not...

  19. 2006 Fundamental Research Underlying Solid-State Lighting: Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kini, Arvind [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kelley, Dick [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-02-01

    This volume highlights the scientific content of the 2006 Fundamental Research Underlying Solid-State Lighting Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) in the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). This meeting is the second in a series of research theme-based Contractors Meetings and will focus on BES/DMS&E-funded research that underpins solid-state lighting technology. The meeting will feature research that cuts across several DMS&E core research program areas. The major programmatic emphasis is on developing a fundamental scientific base, in terms of new concepts and new materials that could be used or mimicked in designing novel materials, processes or devices.

  20. DOE contractor radiation safety CBT [computer based training] course

    International Nuclear Information System (INIS)

    Westinghouse Hanford Company developed a generic Radiation Worker safety CBT course for Department of Energy contractors. Task analysis concentrated on actual and potential tasks and included visits to fourteen different contractor sites. Team Design and Prototype verification formed the major portion of the development phase. Lesson entry was accomplished using the WISE author system from WICAT Systems, Inc. The course features graded task simulations for both Pretest and Final; fourteen Topics in five Lessons, each Topic keyed to ''Critical Acts'' and Questions in the Pretest and Final; Automatic, Intensive, and Manual modes of instruction available for each Lesson; Practical Problems and Sample Questions associated with each Topic; and provisions for local configuration in several areas. The course is deliverable on IBM PC compatible equipment. 2 refs

  1. Construction Management or Contractor : A client´s choice

    OpenAIRE

    Lindblom, Daniel; Isaksson, Jonathan

    2012-01-01

    Clients within the construction industry have become more aware of benefits that exist and can be reached when going through a major construction project, benefits that invite for efficiency improvements both during construction and its prophases. New methods of execution and their different advantages are evaluated. This change has opened the door for new business models such as Construction Management (CM) but it also demands the contractors to adapt and come up with more client-customized ...

  2. Forest machine contractors in Swedish industrial forestry: Significance and conditions during 1986-1993. Doctoral thesis

    Energy Technology Data Exchange (ETDEWEB)

    Liden, E.

    1995-07-01

    The aim of this review was to come to a general understanding of the phenomenon of contracting in forestry as an occupation and a life-style. This has been accomplished by studies on machine ownership, working conditions, and attrition from forestry, using quantitative methods in combination with qualitative ones, during the period 1986 to 1993. The studies pertained to industrial forestry in Sweden. In 1992/93 70% of all machines used in industrial forestry in Sweden were owned by contractors. Together these machines harvested 59% of the total quantity during the 1992/93 harvesting season. Three categories of contractors were recognized; the single contractor, the partner contractor, and the contractor with employees. It was concluded that being a contractor is more a life-style than an occupation. Very often the whole family is involved in the business. The contractors` willingness to work hard and to do a good job is an asset for forestry.

  3. Construction of the Temelin nuclear power plant viewed by the general contractor of the building part

    International Nuclear Information System (INIS)

    Geodesy work is described during the construction of the main production units. The object-oriented network points were first laid out as the geodetic foundation. The main production units were then laid out using the points. Geodesy work on the individual floors of the production units was based on the possibility of plumbing the basic micro-network points. The detailed layout of the structural elements was performed using common geodetic techniques. In processing the geodetic documentation, computers were used, which helped resolve the problems of transformation of local systems into the coordinate system used, of the point field imaging, of polar mapping processing, etc. (E.J.)

  4. BIM Handbook: A guide to Building Information Modeling for owners, managers, designers, engineers and contractors

    Directory of Open Access Journals (Sweden)

    Xiangyu Wang

    2012-09-01

    Full Text Available 2nd Edition C Eastman, P Teicholtz, R Sacks and K Liston ISBN: 978-0-470-54137-1 (Hardcover 648 pages, 2011, AUD $105.00; NZD $120.00, USD 85.00, GBP57.50, EUR 68.00 E-book version ISBN: 978-1-1180-2169-9 544 pages 2011 AUD $84.99 / NZD $99.99, USD69.99, GBP 47.99, EUR 54.99

  5. BIM Handbook: A guide to Building Information Modeling for owners, managers, designers, engineers and contractors

    Directory of Open Access Journals (Sweden)

    Xiangyu Wang

    2012-09-01

    Full Text Available 2nd EditionC Eastman, P Teicholtz, R Sacks and K Liston ISBN: 978-0-470-54137-1 (Hardcover 648 pages, 2011, AUD $105.00; NZD $120.00, USD 85.00, GBP57.50, EUR 68.00E-book version ISBN: 978-1-1180-2169-9 544 pages 2011 AUD $84.99 / NZD $99.99, USD69.99, GBP 47.99, EUR 54.99

  6. Operations Strategy Development in Project-based Production – a building contractor implements Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Friis, Ole Uhrskov

    2015-01-01

    operations strategy development. Originality/value: The present study contributes to the small body of studies of operations strategy development processes by providing insight into how project-based companies renew their operations strategy. Key words: Lean, Construction, Operations Strategy, Political......Purpose: To study how operations strategy innovation occurs in project-based production and organisation. Design/methodology/approach: A longitudinal case study encompassing the processes at the company headquarters and in two projects using Lean. Findings: The operations strategy development...... commences at a middle level in the organisation, is underpinned and embedded in production projects, and only after several years becomes embedded in the corporate operations strategy. The projects use Lean principles in a differentiated manner. Research limitations/implications: A qualitative case study...

  7. A method for optimizing the performance of buildings

    DEFF Research Database (Denmark)

    Pedersen, Frank

    2007-01-01

    building, such as its shape, the amount and type of windows used, and the amount of insulation used in the building envelope. The parties who influence design decisions for buildings, such as building owners, building users, architects, consulting engineers, contractors, etc., often have different and to...... some extent conflicting requirements to buildings. For instance, the building owner may be more concerned about the cost of constructing the building, rather than the quality of the indoor climate, which is more likely to be a concern of the building user. In order to support the different types of...... decisions. The algorithm is evaluated by applying it to a set of test problems with known solutions. The results indicate that the algorithm converges fast and in a stable manner, as long as there are no active domain constraints. In this case, convergence is either deteriorated or prevented. This case is...

  8. Contractor/supplier of energy services. Liberalization of the energy market and the need for energy services

    International Nuclear Information System (INIS)

    A market for energy services is emerging. Energy suppliers and building services contractors have the same customers but have traditionally operated in different markets. The boundary between the energy and building services markets is blurred. Substantial degrees of freedom are being created for the customer in a free market. After the initial euphoria about this, there will be a realization that there are also risks, for example as a result of price fluctuations, uncertainty about supplier reliability, the effects of the rates system, complex regulation and political decision making. If people want to reduce these risks and through this make costs controllable, attention must be paid to the interdependence between aspects on the supply side, in the energy supply system and on the demand side

  9. Technical assistance contractor management plan: Surface and ground water

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  10. Technical assistance contractor management plan: Surface and ground water

    International Nuclear Information System (INIS)

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC's mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel

  11. Proceedings wind energy R and D contractor meeting

    International Nuclear Information System (INIS)

    This books contains a collection of progress reports from the participating contractors in the wind energy R and D sub-programme within the JOULE (Joint Opportunities for Unconventional or Long term Energy supply) programme on non-nuclear energy and rational use of energy. The current wind energy programme consists of 25 multi-partner projects which are closely interrelated and cover a broad spectrum of topics. These are grouped within the following research areas: A: Wind measuring and modelling; B: Wind turbine experiments and utilisation; C: Development of components and models; D: Stand-Alone and offshore; E: Large-wind turbines

  12. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  13. Reactor building

    International Nuclear Information System (INIS)

    The whole reactor building is accommodated in a shaft and is sealed level with the earth's surface by a building ceiling, which provides protection against penetration due to external effects. The building ceiling is supported on walls of the reactor building, which line the shaft and transfer the vertical components of forces to the foundations. The thickness of the walls is designed to withstand horizontal pressure waves in the floor. The building ceiling has an opening above the reactor, which must be closed by cover plates. Operating equipment for the reactor can be situated above the building ceiling. (orig./HP)

  14. Global petroleum fiscal systems compared by contractor take

    International Nuclear Information System (INIS)

    Petroleum fiscal terms in most countries are tougher than in the US, but these countries have more geological potential and still may be economically attractive. The market for exploration capital and technology is super competitive and getting more sophisticated. Governments are increasingly aware of the global market for exploration acreage or rehabilitation projects. For many oil companies, an important part of the negotiations is to secure terms acceptable to the potential partner. Knowing the market and what terms are realistic depends on a region's potential and other factors. Most countries developing petroleum fiscal systems are opting for the production sharing contract (PSC). This trend began in the 1960s. Now, nearly half of the countries with petroleum potential have a system based on the PSC. However, financial results could be the same in a royalty/tax arrangement. Economics depend primarily on division of profits or what is known as government/contractor take. The paper discusses contractor take, estimating take, Indonesian split, and take implications

  15. Environmental Program Description for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    POWELL, P.A.

    2000-04-20

    This Environmental Program Description has been developed in support of the Integrated Environmental, Safety, and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan. This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Description for the Tank Farm Contractor (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of five core functions. Each section of this plan describes the activities (formerly known as the Tank Waste Remediation System) of the Tank Farm Contractor (TFC) environmental organization according to the following core functions: Establish Environmental Policy and Define Work Scope; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Provide Feedback and Continuous Improvement; and Perform Work within Controls.

  16. Acoustic location of infiltration openings in buildings. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Keast, D.N.

    1978-10-01

    Unnecessary air infiltration (''draftiness'') in buildings can be a major cause for excessive energy consumption. A method for using sound to locate, for subsequent sealing, the openings of air infiltration leakage paths in buildings has been investigated. The results of pertinent analytical studies, laboratory experiments, and field applications of this acoustic-location method are reported; and a plan is provided to encourage national implementation of the method. Low-cost, readily available equipment and procedures are described whereby the average building contractor or homeowner can use acoustic leak location to pinpoint many of the air infiltration openings in a building.

  17. Building America

    Energy Technology Data Exchange (ETDEWEB)

    Brad Oberg

    2010-12-31

    IBACOS researched the constructability and viability issues of using high performance windows as one component of a larger approach to building houses that achieve the Building America 70% energy savings target.

  18. Steam System Balancing and Tuning for Multifamily Residential Buildings in Chicagoland

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Jayne [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States); Ludwig, Peter [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States); Brand, Larry [Partnership for Advanced Residential Retrofit (PARR), Chicago, IL (United States)

    2012-08-01

    Older heating systems often suffer from mis-investment--multiple contractors upgrading parts of systems in inadequate or inappropriate ways that reduce system functionality and efficiency--or from a lack of proper maintenance. This technical report addresses these barriers to information, contractor resources, and cost-savings. Building off of previous research, CNT Energy conducted a study to identify best practices for the methodology, typical costs, and energy savings associated with steam system balancing.

  19. Solar building

    OpenAIRE

    Zhang, Luxin

    2014-01-01

    In my thesis I describe the utilization of solar energy and solar energy with building integration. In introduction it is also mentioned how the solar building works, trying to make more people understand and accept the solar building. The thesis introduces different types of solar heat collectors. I compared the difference two operation modes of solar water heating system and created examples of solar water system selection. I also introduced other solar building applications. It is conv...

  20. California commercial building energy benchmarking

    Energy Technology Data Exchange (ETDEWEB)

    Kinney, Satkartar; Piette, Mary Ann

    2003-07-01

    Building energy benchmarking is the comparison of whole-building energy use relative to a set of similar buildings. It provides a useful starting point for individual energy audits and for targeting buildings for energy-saving measures in multiple-site audits. Benchmarking is of interest and practical use to a number of groups. Energy service companies and performance contractors communicate energy savings potential with ''typical'' and ''best-practice'' benchmarks while control companies and utilities can provide direct tracking of energy use and combine data from multiple buildings. Benchmarking is also useful in the design stage of a new building or retrofit to determine if a design is relatively efficient. Energy managers and building owners have an ongoing interest in comparing energy performance to others. Large corporations, schools, and government agencies with numerous facilities also use benchmarking methods to compare their buildings to each other. The primary goal of Task 2.1.1 Web-based Benchmarking was the development of a web-based benchmarking tool, dubbed Cal-Arch, for benchmarking energy use in California commercial buildings. While there were several other benchmarking tools available to California consumers prior to the development of Cal-Arch, there were none that were based solely on California data. Most available benchmarking information, including the Energy Star performance rating, were developed using DOE's Commercial Building Energy Consumption Survey (CBECS), which does not provide state-level data. Each database and tool has advantages as well as limitations, such as the number of buildings and the coverage by type, climate regions and end uses. There is considerable commercial interest in benchmarking because it provides an inexpensive method of screening buildings for tune-ups and retrofits. However, private companies who collect and manage consumption data are concerned that the

  1. Building 2000

    International Nuclear Information System (INIS)

    This is the first volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this first rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In a second volume, a similar series of studies is presented for the building categories: office buildings, public buildings and hotels and holiday complexes. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (15 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  2. Inspection of the Department of Energy`s procedures for administering contractors` executive employees` compensation

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-10

    An inspection was conducted of certain aspects of the Department of Energy`s administration of its management and operating and other designated contractors` executive employees` compensation. The purpose of the inspection was to evaluate whether Departmental officials were performing their responsibilities for reviewing, approving and reporting contractors` executive employees` compensation. Contractor executive employees` compensation totalled $533 million in fiscal year 1991. Results are described.

  3. Model Employment Policies for Federal Contractors Related to Sexual Orientation and Gender Identity

    OpenAIRE

    Mallory, Christy; Romero, Adam, E.; Sears, Brad

    2015-01-01

    This document provides model policies for federal contractors, subcontractors, and federally-assisted contractors (collectively, “federal contractors”) to comply with Executive Order (“EO”) 11246 and other laws prohibiting sexual orientation and gender identity discrimination in employment. Federal contractors are prohibited by executive order from engaging in sexual orientation and gender identity discrimination. In addition, federal courts and agencies are increasingly concluding that Title...

  4. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    International Nuclear Information System (INIS)

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts

  5. 48 CFR 2109.7001 - Minimum standards for FEGLI Program contractors.

    Science.gov (United States)

    2010-10-01

    ... rate redeterminations with OPM. (g) The Contractor must furnish such reasonable reports as OPM... against waste, loss, unauthorized use, or misappropriation; (3) Revenues and expenditures applicable...

  6. CHANGE OF CONTRACTOR FOR THE FACILITIES MANAGEMENT ACTIVITIES AT CERN

    CERN Document Server

    2003-01-01

    The Facilities Management contract at CERN, under the responsibility of ST Division, Group FM, is in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), cleansing, passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent control and insect control. Starting from the 1st June the present contractor will stop some activities that will be taken under its responsibility by the new one, INGEST Facility. The remaining activities (including cleaning) will be moved on the 1st July. Minor perturbation in the service might occur. The contact number will ...

  7. CHANGE OF CONTRACTOR FOR THE FACILITIES MANAGEMENT ACTIVITIES AT CERN

    CERN Multimedia

    2003-01-01

    The Facilities Management contract at CERN, under the responsibility of ST Division, Group FM, is in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), cleansing, passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent control and insect control. Starting from the 1st June the present contractor will stop some activities that will be taken under its responsibility by the new one, INGEST Facility. Others activities will be moved on the 1st July. Minor perturbation in the service might occur. The contact number will not change and will be opera...

  8. Enhancement of radiological safety culture within Ignalina NPP and contractors

    International Nuclear Information System (INIS)

    The Lithuanian Hygiene Standard HN 83:1998 'Radiation Protection of Outside Workers' (1998), that is based on requirements set out in the Law on Radiation Protection of the Republic of Lithuania (No. VIII-1190 of 12 January 1999), and other legal acts, establishes the radiation protection requirements for contractors (hereinafter - outside workers) when they are performing their activities within the controlled areas. The principal requirement of the Lithuanian Hygiene Standard HN 83:1998 is that the radiation protection of outside workers shall be at the same scale as of permanent workers. One of crucial points for ensuring the high radiological safety culture between the license holder, employer and outside workers is the clear allocation of tasks and distribution of' responsibilities in the field of radiation protection. The basic requirements for radiation protection of outside workers and main factors that help to enhance the radiological safety culture within Ignalina NPP and outside workers are discussed in the paper. (authors)

  9. PRIVATE MILITARY CONTRACTORS, WAR CRIMES AND INTERNATIONAL HUMANITARIAN LAW

    Directory of Open Access Journals (Sweden)

    Chukwuma Osakwe

    2014-05-01

    Full Text Available The end of the Cold War witnessed the growth and spread of legally established private military contractors (PMCs playing largely undefined roles in wars, international security and post-conflict reconstruction. The operations of PMCs in Iraq and Afghanistan in the 21st century have been marked by gross human rights abuses and poor treatment and torture of prisoners of war (POWs. Indeed, PMCs are likely to step outside their contractual obligations and commit criminal acts. This article adds to the literature on the subject by arguing that the elusiveness of PMCs’ individual or corporate responsibility for war crimes presents one of the greatest challenges for international humanitarian law (IHL. This presents a dilemma for IHL, which seeks to address individual offences. The situation becomes even more complicated when non-governmental organisations (NGOs and multinational corporations (MNCs are involved in the use of PMCs.

  10. Building 2000

    International Nuclear Information System (INIS)

    This is the second volume of Building 2000, a pilot project of the Commission's R and D-programme 'Solar Energy Applications to Buildings' with the purpose of encouraging the adoption of solar architecture in large buildings. In this second rich illustrated volume the results of the design studies illustrating passive solar architecture in buildings in the European Community are presented in particular for the building categories as mentioned in the subtitle. In the first volume, a similar series of studies is presented for the building categories: schools, laboratories and universities, and sports and educational centres. Several Design Support Workshops were organized during the Building 2000 programme during which Building 2000 design teams could directly exchange ideas with the various design advice experts represented at these workshops. In the second part of the Building 2000 final report a summary of a selection of many reports is presented (11 papers), as produced by Design Support experts. Most of the design support activities resulted in changes of the various designs, as have been reported by the design teams in the brochures presented in the first part of this book. It is to be expected that design aids and simulation tools for passive solar options, daylighting concepts, comfort criteria etc., will be utilized more frequently in the future. This will result in a better exchange of information between the actual design practitioners and the European R and D community. This technology transfer will result in buildings with a higher quality with respect to energy and environmental issues

  11. Laboratory Building.

    Energy Technology Data Exchange (ETDEWEB)

    Herrera, Joshua M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-01

    This report is an analysis of the means of egress and life safety requirements for the laboratory building. The building is located at Sandia National Laboratories (SNL) in Albuquerque, NM. The report includes a prescriptive-based analysis as well as a performance-based analysis. Following the analysis are appendices which contain maps of the laboratory building used throughout the analysis. The top of all the maps is assumed to be north.

  12. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-06-11

    ... Acquisition Regulation Supplement (DFARS) Case 2003-D050, published at 71 FR 9273, February 23, 2006, moved...; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense Acquisition Regulations System... and relocate the requirements for conducting a Contractor Insurance/Pension Review from...

  13. EDRP public local inquiry, UKAEA/BNFL precognition on: Contractor accommodation

    International Nuclear Information System (INIS)

    The availability of accommodation for contractors working on the proposed EDRP at Dounreay is discussed. It is predicted that the contractors could be accommodated without the need for special arrangement and with no adverse effect on the tourist industry. (U.K.)

  14. 48 CFR 245.608-7 - Reimbursement of cost for transfer of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... Reporting, Redistribution, and Disposal of Contractor Inventory 245.608-7 Reimbursement of cost for transfer... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Reimbursement of cost for transfer of contractor inventory. 245.608-7 Section 245.608-7 Federal Acquisition Regulations...

  15. 40 CFR 51.364 - Enforcement against contractors, stations and inspectors.

    Science.gov (United States)

    2010-07-01

    ... Inspection/Maintenance Program Requirements § 51.364 Enforcement against contractors, stations and inspectors. Enforcement against licensed stations or contractors, and inspectors shall include swift, sure, effective, and consistent penalties for violation of program requirements. (a) Imposition of penalties. A penalty...

  16. 41 CFR Appendix A to Part 61 - 250-Federal Contractor Veterans' Employment Report VETS-100

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true 250-Federal Contractor Veterans' Employment Report VETS-100 A Appendix A to Part 61 Public Contracts and Property Management Other... Appendix A to Part 61-250—Federal Contractor Veterans' Employment Report VETS-100 ER05NO08.000...

  17. 41 CFR Appendix A to Part 61 - 300-Federal Contractor Veterans' Employment Report VETS-100A

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true 300-Federal Contractor Veterans' Employment Report VETS-100A A Appendix A to Part 61 Public Contracts and Property Management.... A Appendix A to Part 61-300—Federal Contractor Veterans' Employment Report VETS-100A...

  18. 75 FR 60264 - Federal Acquisition Regulation; Encouraging Contractor Policies To Ban Text Messaging While Driving

    Science.gov (United States)

    2010-09-29

    ... 9000-AL64 Federal Acquisition Regulation; Encouraging Contractor Policies To Ban Text Messaging While..., 2009 (74 FR 51225, October 6, 2009), entitled ``Federal Leadership on Reducing Text Messaging while... encourage Federal contractors and subcontractors to adopt and enforce policies that ban text messaging...

  19. Evaluation Criteria to Deliverables Crosswalk for the Tank Farm Contractor (Supercedes HNF-2020)

    International Nuclear Information System (INIS)

    Before the Office of River Protection can authorize proceeding with Phase 1B, the Tank Farm Contractor (TFC) must demonstrate readiness to retrieve and deliver the waste to the privatization contractor and to receive and dispose of the products and by-products returned from treatment. The TFC has organized their plans for providing these support services into the within the River Protection Project

  20. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Science.gov (United States)

    2010-07-01

    ... applicable regulations, including 40 CFR parts 31, 32 and 35; (d) The modification/replacement project is... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Rotating biological contractor (RBC... § 35.2035 Rotating biological contractor (RBC) replacement grants. The Regional Administrator may...

  1. 77 FR 11127 - Medicaid Program; Announcement of Medicaid Recovery Audit Contractors (RACs) Contingency Fee Update

    Science.gov (United States)

    2012-02-24

    ... Medicaid RAC programs. In the September 16, 2011 Federal Register (76 FR 57808), we published a final rule... FR 57808), we published a final rule entitled: ``Medicaid Program; Recovery Audit Contractors.'' This... Recovery Audit Contractors (RACs) Contingency Fee Update AGENCY: Centers for Medicare & Medicaid...

  2. 32 CFR Appendix to Part 173 - List of Contractors for Whom Certification Is Required

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false List of Contractors for Whom Certification Is... to Part 173—List of Contractors for Whom Certification Is Required Armtec, Incorporated, 410 Highway... as to contracts originating in the following division: McDonnell Aircraft Company, St. Louis,...

  3. 48 CFR 9.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... Approval—Contractor Testing, in solicitations and contracts when a fixed-price contract is contemplated and... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Testing performed by the... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed...

  4. 20 CFR 632.125 - Responsibilities of Native American grantees, subgrantees and contractors for preventing fraud...

    Science.gov (United States)

    2010-04-01

    ..., subgrantees and contractors for preventing fraud and program abuse and for general program management. 632.125... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Prevention of Fraud and Program Abuse § 632.125 Responsibilities of Native American grantees, subgrantees and contractors for preventing fraud and program...

  5. 78 FR 48123 - Federal Acquisition Regulation; Contractor Comment Period, Past Performance Evaluations

    Science.gov (United States)

    2013-08-07

    ... performance evaluation has been submitted to the system and is available for contractor comment. This is the equivalent of ``providing'' the past performance evaluation to the contractor, and it starts the suspense... performance evaluation, and the past performance evaluation is not made available until after the...

  6. 48 CFR 952.227-11 - Patent rights-retention by the contractor (short form).

    Science.gov (United States)

    2010-10-01

    ... its domestic subsidiary and affiliates, if any, within the corporate structure of which the Contractor... subcontracting at 13 CFR 121.3-8 and 13 CFR 121.3-12, respectively, will be used. (6) Subject invention means any invention of the contractor conceived or first actually reduced to practice in the performance of work...

  7. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Science.gov (United States)

    2012-08-24

    ...DoD, GSA, and NASA are proposing to amend the Federal Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor information systems that contain information provided by or generated for the Government (other than public information) that will be resident on or transiting through contractor information...

  8. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract... disseminating personal information. The record system affected is considered to be maintained by the Air Force... the record system number, as required by the Defense Acquisition Regulation and this part....

  9. 48 CFR 52.203-13 - Contractor Code of Business Ethics and Conduct.

    Science.gov (United States)

    2010-10-01

    ... Business Ethics and Conduct. 52.203-13 Section 52.203-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.203-13 Contractor Code of Business Ethics and Conduct. As prescribed in 3.1004(a), insert the following clause: Contractor Code of Business Ethics and Conduct (APR 2010) (a)...

  10. Final Technical Report. Training in Building Audit Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Brosemer, Kathleen [Sault Sainte Marie Tribe of Chippewa Indians, Marie, MI (United States)

    2015-03-27

    In 2011, the Tribe proposed and was awarded the Training in Building Audit Technologies grant from the DOE in the amount of $55,748 to contract for training programs for infrared cameras, blower door technology applications and building systems. The coursework consisted of; Infrared Camera Training: Level I - Thermal Imaging for Energy Audits; Blower Door Analysis and Building-As-A-System Training, Building Performance Institute (BPI) Building Analyst; Building Envelope Training, Building Performance Institute (BPI) Envelope Professional; and Audit/JobFLEX Tablet Software. Competitive procurement of the training contractor resulted in lower costs, allowing the Tribe to request and receive DOE approval to additionally purchase energy audit equipment and contract for residential energy audits of 25 low-income Tribal Housing units. Sault Tribe personnel received field training to supplement the classroom instruction on proper use of the energy audit equipment. Field experience was provided through the second DOE energy audits grant, allowing Sault Tribe personnel to join the contractor, Building Science Academy, in conducting 25 residential energy audits of low-income Tribal Housing units.

  11. Balancing Hydronic Systems in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Ruch, Russell [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Ludwig, Peter [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Maurer, Tessa [Partnership for Advanced Residential Retrofit, Chicago, IL (United States)

    2014-07-01

    In multifamily hydronic systems, temperature imbalance may be caused by undersized piping, improperly adjusted balancing valves, inefficient water temperature and flow levels, and owner/occupant interaction with the boilers, distribution, and controls. The imbalance leads to tenant discomfort, higher energy use intensity, and inefficient building operation. This research, conducted by Building America team Partnership for Advanced Residential Retrofit, explores cost-effective distribution upgrades and balancing measures in multifamily hydronic systems, providing a resource to contractors, auditors, and building owners on best practices to improve tenant comfort and lower operating costs. The team surveyed existing knowledge on cost-effective retrofits for optimizing distribution in typical multifamily hydronic systems, with the aim of identifying common situations and solutions, and then conducted case studies on two Chicago area buildings with known balancing issues in order to quantify the extent of temperature imbalance. At one of these buildings a booster pump was installed on a loop to an underheated wing of the building. This study found that unit temperature in a multifamily hydronic building can vary as much as 61°F, particularly if windows are opened or tenants use intermittent supplemental heating sources like oven ranges. Average temperature spread at the building as a result of this retrofit decreased from 22.1°F to 15.5°F.

  12. Technical assistance contractor occurrence reporting and processing system

    International Nuclear Information System (INIS)

    Members of the Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) are responsible to notify management of TAC occurrence reporting and processing system (ORPS) classified occurrences .An ORPS occurrence is an unexpected or unplanned event on DOE property which causes bodily harm, death, damage to government property, exposure to toxic or hazardous substances above acceptable limits to workers, the environment, or general public. Examples of potential reportable occurrences include, but not limited to, site personnel exposures to airborne contaminants, incidents which could expose the general public to high levels of radiation or other contaminants, a vehicle accident resulting in property damage or personnel injuries. Listed TAC manager/staff contacts, with the assistance of TAC ORPS Program Coordinators, will determine if the occurrence is reportable under Department of Energy (DOE) Order M 232.1-2. The reportable occurrences will be classified as emergency, unusual, or off-normal. If determined to be reportable, listed TAC manager/staff will verbally report the details of the occurrence to the DOE Duty Officer within 2 hours of initial notification, and provide a written report of the event by noon the following work day

  13. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    The purpose of this plan is to establish the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program and outline the activities and schedules that will be employed to reduce the quantity and toxicity of wastes generated as a result of restoration and remediation activities. It is intended to satisfy the US Department of Energy (DOE) and other legal requirements. As such, the Pollution Prevention Awareness program required by DOE Order 5400.1 is included with the Pollution Prevention Program. This plan is also intended to aid projects in meeting and documenting compliance with the various requirements for WMin/P2, and contains the policy, objectives, strategy, and support activities of the WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Various pollution prevention techniques will be implemented with the support of employee training and awareness programs to reduce waste and still meet applicable requirements. Information about the Hanford Site is in the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan

  14. UMTRA project technical assistance contractor quality assurance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  15. Nuclear criticality safety training: guidelines for DOE contractors

    International Nuclear Information System (INIS)

    The DOE Order 5480.1A, Chapter V, Safety of Nuclear Facilities, establishes safety procedures and requirements for DOE nuclear facilities. This guide has been developed as an aid to implementing the Chapter V requirements pertaining to nuclear criticality safety training. The guide outlines relevant conceptual knowledge and demonstrated good practices in job performance. It addresses training program operations requirements in the areas of employee evaluations, employee training records, training program evaluations, and training program records. It also suggests appropriate feedback mechanisms for criticality safety training program improvement. The emphasis is on academic rather than hands-on training. This allows a decoupling of these guidelines from specific facilities. It would be unrealistic to dictate a universal program of training because of the wide variation of operations, levels of experience, and work environments among DOE contractors and facilities. Hence, these guidelines do not address the actual implementation of a nuclear criticality safety training program, but rather they outline the general characteristics that should be included

  16. Radiation exposures for DOE and DOE contractor employees, 1990

    International Nuclear Information System (INIS)

    This is the 23rd in a series of annual radiation exposure reports published by the Department of Energy (DOE) or its predecessors. This report summarizes the radiation exposures received by both employees and visitors at DOE and DOE contractor facilities during 1990. Trends in radiation exposures are evaluated by comparing the doses received in 1990 to those received in previous years. The significance of the doses is addressed by comparing them to the DOE limits and by correlating the doses to health risks based on risk estimated from expert groups. This report is the third that is based on detailed exposure data for each individual monitored at a DOE facility. Prior to 1988, only summarized data from each facility were available. This report contains information on different types of radiation doses, including total effective, internal, penetrating, shallow, neutron, and extremity doses. It also contains analysis of exposures by age, sex, and occupation of the exposed individuals. This report also continues the precedent established in the Twenty-First (1988) Annual Report by conducting a detailed, one-time review and analysis of a particular topic of interest. The special topic for this report is a comparison of total effective, internal, and extremity dose equivalent values against penetrating dose equivalent values

  17. United States extension of indemnification to utilities and contractors

    International Nuclear Information System (INIS)

    The status of legislation in the United States, usually known as the Price-Anderson Act, provides an assured source and means of compensation for members of the public who may be injured as a result of a nuclear accident at a licensed commercial nuclear power plant or at a facility of the United States Government operated by a contractor. First a brief overview of the Act and its history is given, then the course of legislation to extend the Price-Anderson Act through the United States Congress is charted with comments made on the major issues of the debate. The Act requires that a least $560 million in insurance and/or Government indemnity is available to cover public liability claims arising out of an accident at a nuclear power plant. The Act also limits the total liability of all persons for any nuclear incident to a predetermined amount and this is one issue discussed. Final action on the legal situation should be taken in 1988. (U.K.)

  18. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  19. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  20. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    ‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which......, which gives the book a challenging contribution to the existing body of knowledge....

  1. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  2. Reactor building

    International Nuclear Information System (INIS)

    The present invention concerns a structure of ABWR-type reactor buildings, which can increase the capacity of a spent fuel storage area at a low cost and improved earthquake proofness. In the reactor building, the floor of a spent fuel pool is made flat, and a depth of the pool water satisfying requirement for shielding is ensured. In addition, a depth of pool water is also maintained for a equipment provisionally storing pool for storing spent fuels, and a capacity for a spent fuel storage area is increased by utilizing surplus space of the equipment provisionally storing pool. Since the flattened floor of the spent fuel pool is flushed with the floor of the equipment provisionally storing pool, transfer of horizontal loads applied to the building upon occurrence of earthquakes is made smooth, to improve earthquake proofness of the building. (T.M.)

  3. Building Languages

    Science.gov (United States)

    ... family's native language) is taught as the child's second language through reading, writing, speech, and use of residual ... that parents can use to help their child learn language. There are many types of building blocks, and ...

  4. 48 CFR 603.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 603.104-4... contractor bid or proposal information and source selection information. (a) The following classes of persons may be authorized to receive contractor bid or proposal information or source selection information...

  5. 48 CFR 1303.104-4 - Disclosure, protection and marking of contractor bid or proposal information and source selection...

    Science.gov (United States)

    2010-10-01

    ... marking of contractor bid or proposal information and source selection information. 1303.104-4 Section... contractor bid or proposal information and source selection information. Contractor bid or proposal information and source selection information must be protected from unauthorized disclosure in accordance...

  6. 48 CFR 1403.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 1403.104-4... marking of contractor bid or proposal information and source selection information. (a) The following classes of persons may be authorized access to contractor bid or proposal information and source...

  7. TPX: Contractor preliminary design review. Volume 2, PF systems engineering

    Energy Technology Data Exchange (ETDEWEB)

    Calvin, H.A. [Lawrence Livermore National Lab., CA (United States)

    1995-07-28

    This system development specification covers the Poloidal Field (PF) Magnet System, WBS 14 in the Princeton Plasma Physics Laboratory TPX Program to build a tokamak fusion reactor. This specification establishes the performance, design, development and test requirements of the PF Magnet System.

  8. TPX: Contractor preliminary design review. Volume 2, PF systems engineering

    International Nuclear Information System (INIS)

    This system development specification covers the Poloidal Field (PF) Magnet System, WBS 14 in the Princeton Plasma Physics Laboratory TPX Program to build a tokamak fusion reactor. This specification establishes the performance, design, development and test requirements of the PF Magnet System

  9. Balancing Hydronic Systems in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Ruch, R.; Ludwig, P.; Maurer, T.

    2014-07-01

    In multifamily hydronic systems, temperature imbalance may be caused by undersized piping, improperly adjusted balancing valves, inefficient water temperature and flow levels, and owner/occupant interaction with the boilers, distribution and controls. The effects of imbalance include tenant discomfort, higher energy use intensity and inefficient building operation. This paper explores cost-effective distribution upgrades and balancing measures in multifamily hydronic systems, providing a resource to contractors, auditors, and building owners on best practices to improve tenant comfort and lower operating costs. The research was conducted by The Partnership for Advanced Residential Retrofit (PARR) in conjunction with Elevate Energy. The team surveyed existing knowledge on cost-effective retrofits for optimizing distribution in typical multifamily hydronic systems, with the aim of identifying common situations and solutions, and then conducted case studies on two Chicago area buildings with known balancing issues in order to quantify the extent of temperature imbalance. At one of these buildings a booster pump was installed on a loop to an underheated wing of the building. This study found that unit temperature in a multifamily hydronic building can vary as much as 61 degrees F, particularly if windows are opened or tenants use intermittent supplemental heating sources like oven ranges. Average temperature spread at the building as a result of this retrofit decreased from 22.1 degrees F to 15.5 degrees F.

  10. Radiation exposure for DOE and DOE contractor employees, 1979. Twelfth annual report

    International Nuclear Information System (INIS)

    This report is a summary of the data submitted by DOE and DOE contractors for 1979 for 104,986 employees, representing 81% of all DOE and DOE contractor employees. Of all employees monitored, 47.6% received a dose equivalent that was less than measurable, 50.8% a measurable exposure less than 1 rem, and 1.6% an exposure greater than 1 rem. Only three DOE contractor employees at three separate facilities received whole-body dose equivalents greater than 5 rem during 1979. The two reported cases of internal depositions were both less than the annual dose-equivalent standard and resulted from accidental exposures

  11. Building America Best Practices Series Volume 13: Energy Performance Techniques and Technologies: Preserving Historic Homes

    Energy Technology Data Exchange (ETDEWEB)

    Britt, Michelle L.; Baechler, Michael C.; Gilbride, Theresa L.; Hefty, Marye G.; Makela, Erin KB; Schneider, Elaine C.; Kaufman, Ned

    2011-03-01

    This guide is a resource to help contractors renovate historic houses, while addressing issues such as building durability, indoor air quality, and occupant health, safety, and comfort. The best practices described in this document are based on the results of research and demonstration projects conducted by Building America’s research teams. Building America brings together the nation’s leading building scientists with over 300 production builders to develop, test, and apply innovative, energy-efficient construction practices. The guide is available for download from the DOE Building America website www.buildingamerica.gov.

  12. Innovation Strategy in Slovak Forest Contractor Firms—A SWOT Analysis

    Directory of Open Access Journals (Sweden)

    Martina Štěrbová

    2016-05-01

    Full Text Available The aim of the study is to determine the innovation strategy of contractor firms in the Slovak forestry service sector in the area of further innovation activities development. The strategy identification was based on the analysis of the strengths, weaknesses, opportunities and threats in this sector. The results indicate that weaknesses of contractor firms exceed their strengths and, considering the degree and importance of their impact, opportunities exceed identified threats. Based on these findings revealing the relations in the area of innovation activities of forestry service contractors, the “Strategy of Partnership” was suggested as the most suitable type of strategy. It can be concluded that such a form of grouping cooperation brings many benefits to contractors in the form of information availability, guidance, training, and management of conflicts, risks and uncertainty, which are associated with the innovation process.

  13. Programmatic Baseline Summary for Phase 1 Privatization for the Tank Farm contractor

    International Nuclear Information System (INIS)

    The document describes the systematic integrated baseline planning process and provides a summary of the Tank Farm Contractor scope, schedule and cost analysis developed in support of the Phase 1 privatization mission

  14. Requirements for the project management in the client / engineering contractor relationship

    International Nuclear Information System (INIS)

    Investment projects impose a multitude of requirements upon clients and engineering contractors to cope with the management of project inherent conflicts. The paper reviews certain aspects on why such conflicts develop, and how they may be resolved. (orig.)

  15. 75 FR 43116 - Affirmative Action and Nondiscrimination Obligations of Contractors and Subcontractors...

    Science.gov (United States)

    2010-07-23

    ... does workplace flexibility, including flexibility in work schedules, as well as job-protected leave... result from requiring that Federal contractors and subcontractors make information and communication... existing language on permissible qualifications standards \\2\\ that would better ensure equal...

  16. Eighth annual report of radiation exposures for ERDA and ERDA contractor employees

    International Nuclear Information System (INIS)

    In 1968, the U.S. Atomic Energy Commission (AEC) established a program for reporting certain occupational radiation exposure information to a central radiation records repository maintained at the Union Carbide Computing Technology Center, Oak Ridge, Tennessee. Annual summaries (WASH-1350-R1 through WASH-1350-R6) were reported for the years 1968 to 1973 and included data on AEC contractor employees as well as employees of companies in the private sector licensed by the AEC. The 1974 data for what is presently ERDA and ERDA contractor employees are published in the ERDA 76/119 report. In January 1975, two new agencies, the Energy Research and Development Administration (ERDA) and the U.S. Nuclear Regulatory Commission (NRC) were formed and now share the responsibilities previously held by the AEC. Previous AEC licensees now report to NRC while the contractors report to ERDA. This report contains 1975 radiation exposure data for ERDA and ERDA contractor employees

  17. Undergraduate students win Associated Schools of Construction/Associated General Contractors competition

    OpenAIRE

    Chadwick, Heather Riley

    2010-01-01

    A team of five Virginia Tech students from the Colleges of Architecture and Urban Studies and Engineering won first place in the 2009 Associated Schools of Construction/Associated General Contractors Region II Heavy-Civil competition in Jacksonville, Fla.

  18. 77 FR 14490 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor...

    Science.gov (United States)

    2012-03-12

    ... alleged crime and, for contractor personnel seeking whistleblower protection, where to seek assistance... entities. DoD invites comments from small business concerns and other interested parties on the...

  19. 48 CFR 42.1205 - Agreement to recognize contractor's change of name.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Novation and Change-of... of the Contractor under the contracts are unaffected by this change. (4) Documentary evidence of...

  20. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... novation be accomplished. Dun & Bradstreet may be contacted-- (1) Via the Internet at http://fedgov.dnb.com...://fedgov.dnb.com/webform or if the Contractor does not have Internet access, it may call Dun and...

  1. Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies.

  2. Using Administrative Data to Address Federal Contractor Violations of Equal Employment Opportunity Laws.

    OpenAIRE

    Nan Maxwell; Aravind Moorthy; Caroline Massad Francis; Dylan Ellis

    2013-01-01

    This study uses administrative data to examine trends in, and factors associated with, violations and reviolations of equal employment opportunity laws for federal contractors and the effectiveness of remedies and press releases to deter reviolations.

  3. Cost and schedule control systems criteria for contract performance measurement: contractor reporting/data analysis guide

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    The DOE Cost and Schedule Control Systems Criteria (CSCSC) require that a contractor's management control systems include methods and procedures designed to ensure that they will accomplish, in addition to other requirements, a summarization of data elements to the level of reporting to DOE specified in the contract under separate clause. Reports provided to DOE must relate contract cost, schedule, and technical accomplishment to a baseline plan, within the framework of both the contract Work Breakdown Structure (WBS) and the contractor's organizational structure. This Guide describes the reports available from contractors, with emphasis on the Cost Performance Report (CPR), and provides a framework for using the reported data as a basis for decision making. This Guide was developed to assist DOE Project Managers in assessing contractor performance through proper use of the CPR and supporting reports.

  4. Control of subcontractors by civil works contractor for a nuclear power plant

    International Nuclear Information System (INIS)

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail

  5. Impact of Extending Sexual Orientation and Gender Identity Nondiscrimination Requirements to Federal Contractors

    OpenAIRE

    Badgett, M.V. Lee

    2012-01-01

    A federal executive order that would require contractors to prohibit discrimination based on sexual orientation and gender identity would protect up to 16.5 million more workers than are already protected by state or private anti-discrimination policies. Currently, state laws or private voluntary policies already protect 61% of federal contractor employees from sexual orientation discrimination and 41% from gender identity discrimination. Research also suggests an executive order would not di...

  6. Cost and Productivity Analysis of Southeastern U.S. Logging Contractors from 1996 to 1997

    OpenAIRE

    Omohundro, Christopher Colon

    1999-01-01

    A group of 22 independent southeastern U.S. logging contractors provided 44 contractor-years of detailed cost and production information. Information was collected on demographics, operational characteristics, and business strategies for the participants. Precipitation was statistically proven to not be a good predictor of production, accounting for 2% of the weekly variation. High production through periods of favorable harvesting did not occur. Loggers contracting for the same mill ...

  7. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    ‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...... evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system...

  8. Competence Building

    DEFF Research Database (Denmark)

    Borrás, Susana; Edquist, Charles

    The main question that guides this paper is how governments are focusing (and must focus) on competence building (education and training) when designing and implementing innovation policies. With this approach, the paper aims at filling the gap between the existing literature on competences on the...... one hand, and the real world of innovation policy-making on the other, typically not speaking to each other. With this purpose in mind, this paper discusses the role of competences and competence-building in the innovation process from a perspective of innovation systems; it examines how governments...... and public agencies in different countries and different times have actually approached the issue of building, maintaining and using competences in their innovation systems; it examines what are the critical and most important issues at stake from the point of view of innovation policy, looking...

  9. Building Bridges

    DEFF Research Database (Denmark)

    The report Building Bridges adresses the questions why, how and for whom academic audience research has public value, from the different points of view of the four working groups in the COST Action IS0906 Transforming Audiences, Transforming Societies – “New Media Genres, Media Literacy and Trust...... in the Media”, “Audience Interactivity and Participation”, “The Role of Media and ICT Use for Evolving Social Relationships” and “Audience Transformations and Social Integration”. Building Bridges is the result of an ongoing dialogue between the Action and non-academic stakeholders in the field of audience...

  10. Implementation of BIM in the Danish Building Sector

    DEFF Research Database (Denmark)

    Ussing, Lene Faber; Larsen, Jesper Kranker

    The Danish building sector has now for some years worked for implementation of BIM in the whole building process. In practice, it seems with the long way from the wish of using BIM in the whole building process to what really happens on the projects and building sites. To get an idea of how long...... the BIM implementation has come in the sector, a contractor company at present involved in one of the biggest public construction projects in Denmark was contacted to survey some employees at the project, because such a project ought to be one where BIM is best implemented. This survey shows the...... building sector is implementing BIM, but there are still big challenges to solve both internally in the company and externally both in the immediate environment and distant environment....

  11. Technical safety appraisal: Buildings 776/777 Rocky Flats Plant

    Energy Technology Data Exchange (ETDEWEB)

    Field, H C

    1988-03-01

    Buildings 776/777 at the Rocky Flats Plant are major components of the production complex at the plant site. They have been in operation since 1957. The operations taking place in the buildings are nuclear weapons production support, processing of weapons assemblies returned from Pantex, waste processing, research and development in support of production, special projects, and those generated by support groups, such as maintenance. The appraisal team identified nine deficiencies that it believed required prompt attention. DOE management for EH, the program office (Defense Programs), and the field office analyzed the information provided by the appraisal team and instituted compensatory measures for closer monitoring of contractor activities by knowledgeable DOE staff and staff from other sites. Concurrently, the contractor was requested to address both short-term and long-term remedial measures to correct the identified issues as well as the underlying problems. The contractor has provided his action plan, which is included. This plan was under evaluation by EH and the DOE program office at the time this report was prepared. In addressing the major areas of concern identified above, a well as the specific deficiencies identified by the appraisal team, the contractor and the field office are cautioned to search for the root causes for the problems and to direct corrective actions to those root causes rather than solely to the symptoms to assure the sustainability of the improvements being made. The results of prior TSAs led DOE to conclude that previous corrective actions were not sufficient in that a large number of the individual findings are recurrent. Pending completion of remedial actions over the next few months, enhanced DOE oversight of the contractor is warranted.

  12. Technical safety appraisal: Buildings 776/777 Rocky Flats Plant

    International Nuclear Information System (INIS)

    Buildings 776/777 at the Rocky Flats Plant are major components of the production complex at the plant site. They have been in operation since 1957. The operations taking place in the buildings are nuclear weapons production support, processing of weapons assemblies returned from Pantex, waste processing, research and development in support of production, special projects, and those generated by support groups, such as maintenance. The appraisal team identified nine deficiencies that it believed required prompt attention. DOE management for EH, the program office (Defense Programs), and the field office analyzed the information provided by the appraisal team and instituted compensatory measures for closer monitoring of contractor activities by knowledgeable DOE staff and staff from other sites. Concurrently, the contractor was requested to address both short-term and long-term remedial measures to correct the identified issues as well as the underlying problems. The contractor has provided his action plan, which is included. This plan was under evaluation by EH and the DOE program office at the time this report was prepared. In addressing the major areas of concern identified above, a well as the specific deficiencies identified by the appraisal team, the contractor and the field office are cautioned to search for the root causes for the problems and to direct corrective actions to those root causes rather than solely to the symptoms to assure the sustainability of the improvements being made. The results of prior TSAs led DOE to conclude that previous corrective actions were not sufficient in that a large number of the individual findings are recurrent. Pending completion of remedial actions over the next few months, enhanced DOE oversight of the contractor is warranted

  13. Sustainable Buildings

    DEFF Research Database (Denmark)

    Tommerup, Henrik M.; Elle, Morten

    The scientific community agrees that: all countries must drastically and rapidly reduce their CO2 emissions and that energy efficient houses play a decisive role in this. The general attitude at the workshop on Sustainable Buildings was that we face large and serious climate change problems that...

  14. Tender rules and trust influence on cooperation in the building industry

    DEFF Research Database (Denmark)

    Ussing, Lene Faber; Wandahl, Søren

    -operating. A questionnaire survey including building owners, contractors, suppliers, architects, engineers and client design advisor has been accomplished. The survey shows that the problem with co-operation among others is the way the tendering rules normally are used, where the normal assignment criterion is...

  15. The 324 building radiochemical engineering scales and high-level vault cells plan

    International Nuclear Information System (INIS)

    This closure plan incorporates the requirements and decisions made during a Data Quality Objectives process held in 1996 by the State of Washington Department of Ecology, US Department of Energy Richland Operations Office, and contractors associated with closure of the 324 Building

  16. The 324 building radiochemical engineering scales and high-level vault closure plan

    Energy Technology Data Exchange (ETDEWEB)

    Prignano, A.L.

    1997-05-29

    This closure plan incorporates the requirements and decisions made during a Data Quality Objectives process held in 1996 by the State of Washington Department of Ecology, US Department of Energy Richland Operations Office, and contractors associated with closure of the 324 Building.

  17. Hanford B Reactor Building Hazard Assessment Report

    International Nuclear Information System (INIS)

    The 105-B Reactor (hereinafter referred to as B Reactor) is located in the 100 Area of the Hanford Site near Richland, Washington. The B Reactor is one of nine plutonium production reactors that were constructed in the 1940s during the Cold War Era. Construction of the B Reactor began June 7, 1943, and operation began on September 26, 1944. The Environmental Restoration Contractor was requested by RL to provide an assessment/characterization of the B Reactor building to determine and document the hazards that are present and could pose a threat to the environment and/or to individuals touring the building. This report documents the potential hazards, determines the feasibility of mitigating the hazards, and makes recommendations regarding areas where public tour access should not be permitted

  18. Retail Building Guide for Entrance Energy Efficiency Measures

    Energy Technology Data Exchange (ETDEWEB)

    Stein, J.; Kung, F.

    2012-03-01

    This booklet is based on the findings of an infiltration analysis for supermarkets and large retail buildings without refrigerated cases. It enables retail building managers and engineers to calculate the energy savings potential for vestibule additions for supermarkets; and bay door operation changes in large retail stores without refrigerated cases. Retail managers can use initial estimates to decide whether to engage vendors or contractors of vestibules for pricing or site-specific analyses, or to decide whether to test bay door operation changes in pilot stores, respectively.

  19. Cost estimate classification and accuracy for Major Industrial Plant Projects (MIPP) versus building construction in Germany

    OpenAIRE

    Erbe, Anita

    2014-01-01

    Ongoing pressure on prices for construction projects adds to the significance of cost estimation accuracy in building construction. Due to competition from Asian entrants, main contractors in the plant engineering industry are starting to face a similar situation. In the present paper, the cost estimation standards for Major Industrial Plant Projects (MIPP) are analyzed and compared with the cost estimation standards for Building Construction (BC). The research method uses a literature and st...

  20. Administrative building

    OpenAIRE

    Vokatá, Kateřina

    2015-01-01

    The task of my master´s thesis was to work up a project and a check of a bearing steel construction the multi-storey office building with a garage in Brno. The building is composed of five storey office section and two storey of garage. Ground dimension of administrative part is 38,8m x 35m with distance of pillars 7m,6m and 6,4m. The structural height of floor is 3,5m.Garage is designed with dimensions 36m x 24,8m with structural height of floor 3,5m. Distance of pillars is 5,6m, 6,4m and 7,...

  1. Building economics

    DEFF Research Database (Denmark)

    Pedersen, D.O.(red.)

    Publikationen er på engelsk. Den omfatter alle indlæg på det fjerde internationale symposium om byggeøkonomi, der blev arrangeret af SBI for det internationale byggeforskningsråd CIB. De fem bind omhandler: Methods of Economic Evaluation, Design Optimization, Ressource Utilization, The Building...... Market og Economics and Technological Forecasting in Construction. Et indledende bind bringer statusrapporter for de fem forskningsområder, og det sidste bind sammenfatter debatten på symposiet....

  2. Model Building

    OpenAIRE

    Frampton, Paul H.

    1997-01-01

    In this talk I begin with some general discussion of model building in particle theory, emphasizing the need for motivation and testability. Three illustrative examples are then described. The first is the Left-Right model which provides an explanation for the chirality of quarks and leptons. The second is the 331-model which offers a first step to understanding the three generations of quarks and leptons. Third and last is the SU(15) model which can accommodate the light leptoquarks possibly...

  3. Building Inclusion

    OpenAIRE

    Jeanet Kullberg; Isik Kulu-Glasgow

    2009-01-01

    The social inclusion of immigrants and ethnic minorities is a central issue in many European countries. Governments face challenges in ensuring housing for immigrants, delivering public services, promoting neighbourhood coexistence and addressing residential segregation. The Building Inclusion project, sponsored by the European Commission, enables EU member states to exchange experiences relating to the social inclusion of vulnerable groups. Its special focus is on housing access and housing ...

  4. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    International Nuclear Information System (INIS)

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  5. Development and validation of a strategic repositioning model for defense and aerospace contractors

    Science.gov (United States)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  6. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    Energy Technology Data Exchange (ETDEWEB)

    Chockie, Alan [Chockie Group International, Inc., Seattle, WA (United States)

    2005-09-15

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  7. Management of government personal property in the hands of contractors. Handbook for contracting officers and staff

    Energy Technology Data Exchange (ETDEWEB)

    1982-04-01

    This manual is divided into three parts. Part One applies to the management of Government personal property within the Department of Energy in general terms. Part Two describes the specifics of the application of personal property management techniques to On-Site Contractors. Part three applies to Off-Site Contractors. Part One introduces the field of property management. It discusses: the legal basis and requirements established by Federal Statutes and the parallel authorities and responsibilities; the related evolution of the Department of Energy; the regulation system within the Federal Government and its implementation by the Department for personal property management. The life cycle of equipment is presented and how control over personal property is maintained through an accountability system. Classifications of property and contract clauses are discussed. The relationships of contracting officers and property administrators with contractors are presented in each of the discussions as appropriate. Part One consists of only one chapter and is applicable to the management of property utilized by all types of contractors. It provides the foundation to explore in some detail the actions and interactions that occur between the Department's procurement and property personnel and those of the contractor. This exploration in depth is made in Parts Two and Three.

  8. Occupational dose reduction at Department of Energy contractor facilities: Study of ALARA programs

    International Nuclear Information System (INIS)

    This report provides the US Department of Energy (DOE) and its contractors with information that will be useful for reducing occupational radiation doses at DOE's nuclear facilities. In 1989 and 1990, health physicists from the Brookhaven National Laboratory's (BNL) ALARA Center visited twelve DOE contractor facilities with annual collective dose equivalents greater than 100 person-rem (100 person-cSv). The health physicists interviewed radiological safety staff, engineers, and training personnel who were responsible for dose control. The status of ALARA practices at the major contractor facilities was compared with the requirements and recommendation in DOE Order 5480.11 ''Radiation Protection for Occupational Workers'' and PNL-6577 ''Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are as Low as Reasonably Achievable.'' The information and data collected are described and examples of successful practices are presented. The findings on the status of the DOE Contractor ALARA Programs are summarized and evaluated. In addition, the supplement to this report contains examples of good-practice documents associated with implementing the major elements of a formally documented ALARA program for a major DOE contractor facility

  9. Occupational dose reduction at Department of Energy contractor facilities: Study of ALARA programs. Status 1990

    Energy Technology Data Exchange (ETDEWEB)

    Dionne, B.J.; Meinhold, C.B.; Khan, T.A.; Baum, J.W.

    1992-08-01

    This report provides the US Department of Energy (DOE) and its contractors with information that will be useful for reducing occupational radiation doses at DOE`s nuclear facilities. In 1989 and 1990, health physicists from the Brookhaven National Laboratory`s (BNL) ALARA Center visited twelve DOE contractor facilities with annual collective dose equivalents greater than 100 person-rem (100 person-cSv). The health physicists interviewed radiological safety staff, engineers, and training personnel who were responsible for dose control. The status of ALARA practices at the major contractor facilities was compared with the requirements and recommendation in DOE Order 5480.11 ``Radiation Protection for Occupational Workers`` and PNL-6577 ``Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are as Low as Reasonably Achievable.`` The information and data collected are described and examples of successful practices are presented. The findings on the status of the DOE Contractor ALARA Programs are summarized and evaluated. In addition, the supplement to this report contains examples of good-practice documents associated with implementing the major elements of a formally documented ALARA program for a major DOE contractor facility.

  10. A revealed preference approach to valuations of risk reductions. A contractor's sample

    International Nuclear Information System (INIS)

    The ICRP first recommended the use of the social cost-benefit analysis in evaluating proposed radiation protection policies (dose-limitation) in 1977 and reiterated their conviction 6 years later in the 1983 publication: Cost-Benefit Analysis in the Optimisation of Radiation Protection'. However, the use of CBA in evaluating health intervention programmes has been very limited, especially in the realm of environmental health protection from radiation. This is mainly due to the stringent requirements surrounding valuations of health outcomes, or the valuation of radiation detriment. In orders to apply CBA to evaluate current and proposed radon reduction policies, information on the valuation of risk reductions must be known or estimated. One method involves the use of individual valuation of changes to health (Fuchs 1999). The willingness to pay for radon remediation is an indirect method based on market-based observations of risk behavior. And is one type of revealed preference approach to risk valuation. Valuations for evaluations in the UK radiation protection context have not been undertaken. A revealed preference approach was chosen for this study. Information was collected by questionnaire from 1000 randomly chosen individual households in Northamptonshire, United Kingdom, who were known to be over the Action Level of 200 Bq m-3. Information variables included: radon levels, building and socioeconomic and demographic characteristics, remediation choices and costs, and perceived radon-induced lung cancer risk reduction. No compensating benefits to radon were assumed. The response rate was 47%. The valuation of risk reduction for the contractor remediated sub-sample examined was found to be pound 28,500 per life year, in pound 1997. This compares favourably with estimates generated for other market-based cancer reduction estimates (e.g: breast cancer, stomach cancers). In order the expand the use of optimisation evaluation of radiation protection regulations

  11. Process waste assessment approach, training and technical assistance for DOE contractors

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) and its contractors are faced with a large waste management problem as are other industries. One of the tools used in a successful waste minimization pollution prevention (WMin/P2) program is a process waste assessment (PWA). The purpose of this project was to share the Kansas City Plant's (KCP's) PWA expertise with other DOE personnel and DOE contractors. This consisted of two major activities: (1) The KCP's PWA graded approach methodology was modified with the assistance of DOE/Defense Program's laboratories, and (2) PWA training and technical assistance were provided to interested DOE personnel and DOE contractors. This report documents the FY93 efforts, lesson learned, and future plans for both PWA-related activities

  12. Owner and Contractor Perceptions Toward Factors Causing Delays in Structural and Finishing Works

    Directory of Open Access Journals (Sweden)

    Loanata V.R.

    2010-01-01

    Full Text Available A construction project comprises of a number of work packages, which are subjected to delays. These delays may be caused by many on-site factors. The aim of this research is to represent owner and contractors perceptions towards delay factors that frequently occur in structural and finishing works. Data for analysis were gathered by distributing questionnaire. A total of 198 sets of questionnaire were gathered and used for subsequent analyses. In general, design changes during construction are perceived by respondents as the most frequent factor to cause delay in all structural and finishing works. The results also show that there are a number of differences between owner’s and contractor’s perceptions towards the occurrences of the factors. Whilst most contractors concern that information factors related to project design and scope frequently causing delays in construction works, owners consider many contractor originated factors, as most frequent delay causes.

  13. DOE contractor trade network: a decade of experience in training resource exchange

    International Nuclear Information System (INIS)

    Training Resources and Data Exchange (TRADE) refers to a series of activities designed to increase communication and exchanges of ideas, information, and resources among US Department of Energy contractor operated facilities in the field of training and human resource development. TRADE activities are planned and implemented by the DOE Contractor TRADE Executive Committee. TRADE objectives are accomplished through conference workshops, publications, and special interest groups. TRADE special interest groups include the following: computer-based training, emergency preparedness, industrial hygiene training, human resource issues, radiation protection training, safeguards and security training. The authors discuss how TRADE has evolved to meet changing contractor needs to improve human performance over the last 10 years. TRADE currently has working agreements to share training information with INPO, the Federal Laboratories Consortium, and the National Registry of Radiation Protection Technologists

  14. Strategic Change in a Construction Contractor's Purchasing Organisation and Supplier Relations

    DEFF Research Database (Denmark)

    Koch, Christian; Tambo, Torben

    2010-01-01

    The paper adopts a combined supply chain management and purchasing theory approach to changes in a contractor's purchasing organization and suppliers relations. This is seen to be a complex prolonged change process emerging over long time. The method is qualitative and longitudinal combining ex...... ante studies with ex post elements. As the time frame is ten years a necessary combination of studies with different aims has been done. The case of a major contractor's efforts within supply chain and purchasing exhibits a number of change elements in interaction; new business concepts, processes...

  15. How the organization and human factors positively impact the contractors of nuclear power plants

    International Nuclear Information System (INIS)

    It is recognised that organisations that pay attention to creating a robust nuclear safety culture are likely to be a lower risk than those who do not. the same concept can be applied to contractors. In this article we will focus on the implementation of safety culture and programs to reduce human error in nuclear sector contractors and, on how these programs have a beneficial impact to achieve the safety goals, not only for the company, but for the client who owns the work site. (Author)

  16. Existing buildings

    DEFF Research Database (Denmark)

    Gram-Hanssen, Kirsten

    2014-01-01

    their homes. These policy measures include building regulations, energy tax and different types of incentives and information dissemination. The conclusion calls for new and innovative policy measures to cope with the realities of renovations of owner-occupied houses and how energy efficiency......This paper deals with the energy consumption of existing owner-occupied detached houses and the question of how they can be energy renovated. Data on the age of the Danish housing stock, and its energy consumption is presented. Research on the potential for energy reductions in the Danish housing...... sector is discussed, and it is shown that there is a huge potential for reductions. It is a well-known problem that even if there are relevant technical means and even if it is economically feasible, the majority of house owners do not energy renovate their homes. This paper intends to address what can...

  17. Integrating Responsive Building Elements in Buildings

    DEFF Research Database (Denmark)

    Haase, Matthias; Amato, Alex; Heiselberg, Per

    2006-01-01

    There is a global need for a more sustainable building development. About 50% of energy is used in buildings indicating that buildings provide a considerable potential for operational energy savings. Studies were conducted with the following objectives: to perform a state-of-the-art review of...... responsive building elements, of integrated building concepts and of environmental performance assessment methods to improve and optimize responsive building elements to develop and optimize new building concepts with integration of responsive building elements, HVAC-systems as well as natural and renewable...... energy strategies to develop guidelines and procedures for estimation of environmental performance of responsive building elements and integrated building concepts This paper introduces the ideas of this collaborative work and discusses its usefulness for Hong Kong and China. Special focus was put on the...

  18. Building Information Modeling for Managing Design and Construction

    DEFF Research Database (Denmark)

    Berard, Ole Bengt

    , consequently, the information flow are unique. Therefore, the present study suggests a method for identifying information requirements collaboratively between the design and the construction team. The method is based on pull scheduling for design from lean construction. Furthermore, the study suggests the......Contractors planning and executing construction work encounter many kinds of problems with design information, such as uncoordinated drawings and specification, missing relevant information, and late delivery of design information. Research has shown that missing design information and unintended...... outcome of construction work. Even though contractors regularly encounter design information problems, these issues are accepted as a condition of doing business and better design information has yet to be defined. Building information modeling has the inherent promise of improving the quality of design...

  19. Brand new hall in the main building

    CERN Document Server

    Corinne Pralavorio

    2014-01-01

    The renovation of the UNIQA and post office premises is getting under way, with their reopening scheduled for the spring.   The renovation of the large hall in the main building (Building 500) has finally reached the home straight. As of this week, building contractors will get to work on the last part – the offices of UNIQA and La Poste. In the last week of November, the two concessions moved their offices across Route Scherrer to the same part of Building 510 where UBS was temporarily housed during the bank’s refurbishment. Their services were therefore unavailable for one day. The renovation work will last until the spring, with the new offices expected to open in May 2015. Between now and then, the windows and insulation will be completely refitted, with a view to reducing heat loss considerably, and, above all, the premises will be modernised to improve customer reception and service. For example, UNIQA’s new premises will feature a confidential area, guarantee...

  20. 32 CFR 536.153 - Claims involving tortfeasors other than nonappropriated fund employees: NAFI contractors.

    Science.gov (United States)

    2010-07-01

    ... nonappropriated fund employees: NAFI contractors. 536.153 Section 536.153 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY CLAIMS AND ACCOUNTS CLAIMS AGAINST THE UNITED STATES Nonappropriated Fund Claims § 536.153 Claims involving tortfeasors other than nonappropriated fund employees: NAFI...

  1. 41 CFR 101-25.103-3 - Trading stamps or bonus goods received from contractors.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Trading stamps or bonus... PROCUREMENT 25-GENERAL 25.1-General Policies § 101-25.103-3 Trading stamps or bonus goods received from contractors. When contracts contain a price reduction clause, any method (such as trading stamps or...

  2. 23 CFR 633.209 - Notices to prospective Federal-aid construction contractors.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Notices to prospective Federal-aid construction...) § 633.209 Notices to prospective Federal-aid construction contractors. The State highway department... Development System and Appalachian local access roads construction contracts....

  3. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-11-24

    ... proposed rule at 75 FR 33237 on June 11, 2010, and the public comment period closed on August 10, 2010. No... Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense Acquisition.../Pension Review from Procedures, Guidance, and Information (PGI) to the Defense Federal...

  4. 48 CFR 1852.245-73 - Financial reporting of NASA property in the custody of contractors.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Financial reporting of NASA... CONTRACT CLAUSES Texts of Provisions and Clauses 1852.245-73 Financial reporting of NASA property in the custody of contractors. As prescribed in 1845.106-70(d), insert the following clause: Financial...

  5. 76 FR 49650 - Private Security Contractors (PSCs) Operating in Contingency Operations, Combat Operations or...

    Science.gov (United States)

    2011-08-11

    ... interim rule amending 32 CFR part 159 which was published at 74 FR 34691 on July 17, 2009, is adopted as a... of the Secretary 32 CFR Part 159 Private Security Contractors (PSCs) Operating in Contingency... of Defense for Acquisition, Technology, and Logistics, DoD. ACTION: Final rule. SUMMARY: This...

  6. Current information technology needs of small to medium sized apparel manufacturers and contractors

    Energy Technology Data Exchange (ETDEWEB)

    Wipple, C.; Vosti, E.

    1997-11-01

    This report documents recent efforts of the American Textile Partnership (AMTEX) Demand Activated Manufacturing Architecture (DAMA) Project to address needs that are characterized of small to medium sized apparel manufactures and contractors. Background on the AMTEX/DAMA project and objectives for this specific efforts are discussed.

  7. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  8. 48 CFR 1852.227-11 - Patent Rights-Retention by the Contractor (Short Form).

    Science.gov (United States)

    2010-10-01

    ... of tier, for experimental, developmental, research, design, or engineering work to be performed by... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Patent Rights-Retention by... CLAUSES Texts of Provisions and Clauses 1852.227-11 Patent Rights—Retention by the Contractor (Short...

  9. Abridged style manual for use by contractors producing typed reports to AECB format specifications

    International Nuclear Information System (INIS)

    The AECB contractor's style manual sets down basic standards for content and layout of typewritten reports. Points of style are outlined for reference by authors. The elements of a document and their location are described, and instructions to typists are detailed. Example of proper usage are given and the appendices contain layout pro formas for the setting up of any typewritten page. (author)

  10. 76 FR 39240 - Federal Acquisition Regulation; Encouraging Contractor Policies To Ban Text Messaging While Driving

    Science.gov (United States)

    2011-07-05

    ... 9000-AL64 Federal Acquisition Regulation; Encouraging Contractor Policies To Ban Text Messaging While... published an interim rule in the Federal Register at 75 FR 60264 on September 29, 2010, to amend the FAR to implement E.O. 13513 (October 1, 2009), published in the Federal Register at 74 FR 51225 on October 6,...

  11. Memo of Readiness to Proceed with Phase 1 Privatization for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    This Readiness to Proceed Memorandum provides the CH2M HILL Hanford Group, Inc. formal certification of readiness to proceed with provision of the waste feed and infrastructure to handle the products from the privatization contractor's waste processing plant. Summary information is included from the integrated scope-cost-schedule baseline, the analyses of the baseline, management systems, and systems reviews

  12. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2013-05-22

    ... Register at 76 FR 11363 on March 2, 2011, to implement section 821 of the National Defense Authorization...)(C), and (vii)). 7. Covered Government Support Contractor Organizational Conflict of Interest Comment...: Independently of this rule, the organizational conflict of interest rules restrict a support...

  13. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... does not have any organizational conflicts of interest as defined in 48 CFR 2009.570-2. (2) The... defined in 48 CFR 2009.570-2 in the activities covered by this clause. (c) Work for others. (1... contract have been met. (f) Subcontracts. Except as provided in 48 CFR 2009.570-2, the contractor...

  14. 75 FR 42164 - Notice of Final Determination Updating the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2010-07-20

    ..., including India. The Department expects to receive information on the use of forced child labor on both... Labor's September 11, 2009, notice in the Federal Register (74 FR 46794). As noted in the September 11... Federal Contractor Certification as to Forced or Indentured Child Labor Pursuant to Executive Order...

  15. 78 FR 44158 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2013-07-23

    ... Requiring Federal Contractor Certification as to Forced or Indentured Child Labor (``the EO List'') (77 FR... might have been mined, produced or manufactured by forced or indentured child labor (66 FR 5353... documented in the bibliography. B. Comments on Forced Child Labor in the Production of Garments in India...

  16. Hanford Site Welding Program Successfully Providing A Single Site Function For Use By Multiple Contractors

    International Nuclear Information System (INIS)

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  17. 48 CFR 245.603-71 - Disposal of contractor inventory for NATO cooperative projects.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Disposal of contractor inventory for NATO cooperative projects. 245.603-71 Section 245.603-71 Federal Acquisition Regulations... inventory for NATO cooperative projects. (a) North Atlantic Treaty Organization (NATO) cooperative...

  18. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2013-12-31

    ... AGENCY Clean Water Act; Contractor Access to Confidential Business Information AGENCY: Environmental... access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA) and in connection with... of water-related initiatives for a variety of industries. To obtain assistance in responding to...

  19. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2012-10-05

    ... AGENCY 40 CFR Part 2 Clean Water Act; Contractor Access to Confidential Business Information AGENCY...) Office of Water's (OW's) Office of Science and Technology (OST) has authorized Eastern Research Group... of Water in the preparation of effluent guidelines and standards for certain industries. We...

  20. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-13

    ... AGENCY Clean Water Act; Contractor Access to Confidential Business Information AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The Environmental Protection Agency's (EPA) Office of Water... of section 308 of the Clean Water Act (CWA). Some information being transferred from the pulp,...

  1. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  2. 76 FR 27648 - Submission for OMB Review; Preventing Personal Conflicts of Interest for Contractor Employees...

    Science.gov (United States)

    2011-05-12

    ...Under the provisions of the Paperwork Reduction Act (44 U.S.C. chapter 35), the Regulatory Secretariat (MVCB) will be submitting to the Office of Management and Budget (OMB) a request to review and approve a new information collection requirement regarding Preventing Personal Conflicts of Interest for Contractor Employees Performing Acquisition Functions. Public comments are particularly......

  3. The Environmental Restoration Contractor Publication and Graphic Services style and resources guide. Revision 1

    International Nuclear Information System (INIS)

    The Environmental Restoration Contractor (ERC) Publication and Graphic Services (P ampersand GS) Style and Resources Guide (Rev. 1) presents instructions, uniform conventions, guidelines, specifications, requirements, and detailed process steps that will increase efficiency and reduce costs for ERC organizations, including subcontractors. This Guide also identifies P ampersand GS capabilities that can be provided to support ERC multimedia needs

  4. 78 FR 17673 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2013-03-22

    ... notice was published in the Federal Register at 77 FR 51783, on October 27, 2012. One comment was... submitting to the Office of Management and Budget (OMB) a request to review and approve an extension of a... purchasing system allows the contractor more autonomy in subcontracting actions. Without an...

  5. 41 CFR 102-34.215 - May Government contractors use Government motor vehicles?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false May Government contractors use Government motor vehicles? 102-34.215 Section 102-34.215 Public Contracts and Property... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Official Use of Government Motor Vehicles § 102-34.215 May...

  6. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ... management system vehicles. A notice was published in the Federal Register at 78 FR 23935, on April 23, 2013... Register on March 5, 2010 (75 FR 10267). No public comments were received in prior years that have... Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles...

  7. Perceptions of success in performance-based procurement: Differences between clients and contractors

    NARCIS (Netherlands)

    Duren, van J.M.A.; Dorée, André G.; Voordijk, Hans

    2015-01-01

    Purpose – The purpose of this study is to analyse, from the perspective of agency theory, differences between client and contractor in their perceptions of changes in uncertainty and in inclination to opportunistic behaviour while using a performance-based procurement procedure. In agency theory, d

  8. 48 CFR 352.222-70 - Contractor cooperation in equal employment opportunity investigations.

    Science.gov (United States)

    2010-10-01

    ... Opportunity (EEO) complaints processed pursuant to 29 CFR Part 1614. For purposes of this clause, the... equal employment opportunity investigations. 352.222-70 Section 352.222-70 Federal Acquisition... Texts of Provisions and Clauses 352.222-70 Contractor cooperation in equal employment...

  9. Proceedings of the natural gas RD&D contractors review meeting, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D.

    1995-04-01

    This report contains papers which were presented at the natural gas contractors review meeting held on April 4-6, 1995. Topics were concerned with resource and reserves, low permeability reservoir characterization, natural fracture detection, drilling, completion, and stimulation, and natural gas upgrading. Individual papers were processed separately for the United States Department of Energy databases.

  10. 48 CFR 627.203 - Patent indemnification of Government by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Patent indemnification of Government by contractor. 627.203 Section 627.203 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents 627.203 Patent indemnification...

  11. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    MERCADO, L.C.

    2000-04-22

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects.

  12. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-09-30

    ...Under the provisions of the Paperwork Reduction Act (44 U.S.C. chapter 35), the Regulatory Secretariat (MVCB) will be submitting to the Office of Management and Budget (OMB) a request to review and approve an extension of a previously approved information collection requirement concerning contractor business ethics compliance program and disclosure requirements. Public comments are......

  13. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Science.gov (United States)

    2011-11-02

    ... Business Ethics, and should not be limited to exclude FFRDCs. Comments: Several respondents addressed the... established structures required for implementation of the Contractor Code of Business Ethics for... Federal Register at 74 FR 58584 on November 13, 2009. OFPP and DoD, GSA, and NASA proposed a policy...

  14. 48 CFR 1503.104-5 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ... marking of contractor bid or proposal information and source selection information. 1503.104-5 Section... marking of contractor bid or proposal information and source selection information. (a)(1) The Chief of... with FAR 3.104-5, 15.207, and Agency procedures at 40 CFR part 2....

  15. 48 CFR 203.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 203.104-4....104-4 Disclosure, protection, and marking of contractor bid or proposal information and source selection information. (d)(3) For purposes of FAR 3.104-4(d)(3) only, DoD follows the...

  16. 48 CFR 2903.104-5 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 2903.104-5... contractor bid or proposal information and source selection information. (a) Government employees serving in the following positions are authorized access to proprietary or source selection information, but...

  17. 48 CFR 3.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ..., and marking of contractor bid or proposal information and source selection information. 3.104-4... marking of contractor bid or proposal information and source selection information. (a) Except as... information or source selection information to any person other than a person authorized, in accordance...

  18. A questionnaire study regarding contractors' attitude towards radiation and radiation protection education on the Swedish nuclear power stations

    International Nuclear Information System (INIS)

    The Swedish Radiation Protection Authority has performed a questionnaire study regarding contractors' attitude towards radiation and radiation protection. The report also includes opinions regarding assistance and guidance they get at the nuclear power station. This report is a summary of the contractors' answers that was returned to the Authority

  19. 48 CFR 1845.7209-3 - Loss, damage, or destruction of Government property while in contractor's possession or control.

    Science.gov (United States)

    2010-10-01

    ... incidents; and (8) Other facts or circumstances relevant to determining liability and responsibility for... or other adjusting document to the administrative contracting officer and auditor, if appropriate, to... administrator shall so advise the contractor in writing, thereby relieving the contractor of responsibility...

  20. 34 CFR 674.48 - Use of contractors to perform billing and collection or other program activities.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Use of contractors to perform billing and collection or... LOAN PROGRAM Due Diligence § 674.48 Use of contractors to perform billing and collection or other program activities. (a) The institution is responsible for ensuring compliance with the billing...

  1. 48 CFR 53.303-WH-347 - Department of Labor Form WH-347, Payroll (For Contractor's Optional Use).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Department of Labor Form WH-347, Payroll (For Contractor's Optional Use). 53.303-WH-347 Section 53.303-WH-347 Federal... Illustrations of Forms 53.303-WH-347 Department of Labor Form WH-347, Payroll (For Contractor's Optional...

  2. Building energy analysis tool

    Science.gov (United States)

    Brackney, Larry; Parker, Andrew; Long, Nicholas; Metzger, Ian; Dean, Jesse; Lisell, Lars

    2016-04-12

    A building energy analysis system includes a building component library configured to store a plurality of building components, a modeling tool configured to access the building component library and create a building model of a building under analysis using building spatial data and using selected building components of the plurality of building components stored in the building component library, a building analysis engine configured to operate the building model and generate a baseline energy model of the building under analysis and further configured to apply one or more energy conservation measures to the baseline energy model in order to generate one or more corresponding optimized energy models, and a recommendation tool configured to assess the one or more optimized energy models against the baseline energy model and generate recommendations for substitute building components or modifications.

  3. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  4. Radiation exposures for DOE and DOE contractor employees: Nineteenth annual report, 1986

    International Nuclear Information System (INIS)

    All US Department of Energy (DOE) and DOE contractors are required to submit occupational radiation exposure records to a central repository. The data required include a summary of whole-body exposures to ionizing radiation and a summary of internal depositions of radioactive materials above specified limits. This report is a summary of the data submitted by DOE and DOE contractors for 1986. A total of 94,040 DOE and DOE contractor employees were monitored for whole-body ionizing radiation exposures in 1986. This represents 56.2% of all DOE and DOE contractor employees. In addition to the employees, 63,463 visitors were monitored. The collective dose equivalent for DOE and DOE contractor employeees was 7,911 person-rem. The collective dose equivalent for visitors was 554 person-rem. The highest average dose equivalent for all monitored individuals was observed at fuel fabrication facilities (205 mrem), and the lowest was observed for visitors (9 mrem) to DOE facilities. These averages are significantly less than the DOE 5-rem/year radiation protection standard for whole-body exposures. Three new cases of internal depositions were reported in 1986 that exceeded 50 percent of the pertinent annual dose-equivalent standard. Of these three cases, two occurred in 1974 and are reported now because recent revisions in the dose calculations established these cases as reportable depositions. The third case occurred in 1985, but was not reported until evaluation was completed in early 1987. There were no uptakes of radioactive material reported to have occurred in 1986

  5. Building America

    Energy Technology Data Exchange (ETDEWEB)

    Brad Oberg

    2010-12-31

    Builders generally use a 'spec and purchase' business management system (BMS) when implementing energy efficiency. A BMS is the overall operational and organizational systems and strategies that a builder uses to set up and run its company. This type of BMS treats building performance as a simple technology swap (e.g. a tank water heater to a tankless water heater) and typically compartmentalizes energy efficiency within one or two groups in the organization (e.g. purchasing and construction). While certain tools, such as details, checklists, and scopes of work, can assist builders in managing the quality of the construction of higher performance homes, they do nothing to address the underlying operational strategies and issues related to change management that builders face when they make high performance homes a core part of their mission. To achieve the systems integration necessary for attaining 40% + levels of energy efficiency, while capturing the cost tradeoffs, builders must use a 'systems approach' BMS, rather than a 'spec and purchase' BMS. The following attributes are inherent in a systems approach BMS; they are also generally seen in quality management systems (QMS), such as the National Housing Quality Certification program: Cultural and corporate alignment, Clear intent for quality and performance, Increased collaboration across internal and external teams, Better communication practices and systems, Disciplined approach to quality control, Measurement and verification of performance, Continuous feedback and improvement, and Whole house integrated design and specification.

  6. Delays in Building Construction Projects in Ghana

    Directory of Open Access Journals (Sweden)

    Adwoa B Agyakwah-Baah

    2010-07-01

    Full Text Available This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.

  7. Building trust

    International Nuclear Information System (INIS)

    'Activate' is the energy magazine for secondary schools and is part of the Education Programme which is managed on behalf of the British Nuclear Industry Forum by AEA Technology. activate is the flagship communication device between the British Nuclear Industry Forum's Education Programme and secondary schools in the UK. It was developed from a previous publication, Nuclear Bulletin. There is a need for the nuclear industry to build trust with teachers and students in the UK, where for a long time, everything that the industry has said, written or printed has been disregarded by school teachers as propaganda. Over the last few years the industry has put in a great deal of effort to position itself as a provider of educationally sound and socially acceptable information. 'Activate' was an evolution of this idea and there was a hole in the market for a lively, activity and article based magazine that could be used in the classroom. The target audience is principally teachers of science, mathematics and geography, but also includes teachers of art,, English and history with students of between 11 and 18. The results were very positive in that teachers appreciated the colourful and lively nature of activate and they felt that it provided information and opinions in an un biased and non-propagandist way. Their comments about layout, number of activities style of presentation were taken into account and during the summer of 1994 activate was remodelled ready for re launch in September. The feedback so far is good with more teachers signing up every week to receive their own free copy

  8. Effective contracting mechanisms for nuclear new build

    International Nuclear Information System (INIS)

    additional time and money. This means they may not concern themselves as much as they should with the consequences of their schedule and budget overruns whilst executing the works. At the end of the project, when they are forced to face the ‘realities’ that they may not have a claim (or not nearly as significant a claim as they had let themselves believe), the Contractor cannot avoid the mechanisms which penalise poor performance. The issue becomes purely financial, provides less of an incentive to influence the right behaviours as was intended and the matter gets handed over to litigation lawyers on both sides. Contracting in the nuclear industry is consistent with this scenario. The current contracting models range from Build Own Operate to Owner Managed, but performance related mechanisms mostly operate on a retrospective basis. This is changing though as experience gained from non-nuclear projects migrates to the nuclear industry. The proposition offered by this paper is that: • traditional contracting approaches to incentivisation are not obsolete and still have a role to play in contracting models going forwards; • however, on their own, such traditional approaches do not do enough to promote the right behaviours from contractors and incentivise performance which focuses on optimal outcomes for the project overall. First we will look at some of the traditional mechanisms, then some of the emerging additional/alternative options, and then draw some comparisons and conclusions. (author)

  9. BUILDING 341 Seismic Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Halle, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-15

    The Seismic Evaluation of Building 341 located at Lawrence Livermore National Laboratory in Livermore, California has been completed. The subject building consists of a main building, Increment 1, and two smaller additions; Increments 2 and 3.

  10. Danish building typologies

    DEFF Research Database (Denmark)

    Wittchen, Kim Bjarne; Kragh, Jesper

    The objective of TABULA is to develop a harmonised building typology for European countries. Each national building typology will consist of a set of residential model buildings with characteristic energy-related properties (element areas of the thermal building envelope, U-values, supply system...... efficiencies). The model buildings will each represent a specific construction period of the country in question and a specific building size. Furthermore the number of buildings, flats and the overall floor areas will be given, which are represented by the different building types of the national typologies....

  11. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors. FY 1995 report

    International Nuclear Information System (INIS)

    The Department of Energy and its contractors are faced with environmental concerns and large waste management costs. Federal legislation and DOE Orders require sites to develop waste minimization/pollution prevention programs. In response to these requirements, the Kansas City Plant developed a pollution prevention tool called a pollution prevention opportunity assessment (PPOA). Pilot assessments resulted in the development of a graded approach to reduce the amount of effort required for activities that utilized nonhazardous and/or low-volume waste streams. The project's objectives in FY95 were to validate DOE's PPOA Graded Approach methodology, provide PPOA training and technical assistance to interested DOE personnel and DOE contractors, enhance the methodology with energy analysis and tools for environmental restoration activities, implement a DOE-wide PPOA database, and provide support to DOE EM-334 in the completion of a report which estimates the future potential for pollution prevention and waste minimization in the DOE complex

  12. The selection of construction sub-contractors using the fuzzy sets theory

    International Nuclear Information System (INIS)

    The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set of evaluation criteria, the part of the knowledge base and a description of the output variable

  13. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors. FY 1995 report

    Energy Technology Data Exchange (ETDEWEB)

    Pemberton, S.

    1996-02-01

    The Department of Energy and its contractors are faced with environmental concerns and large waste management costs. Federal legislation and DOE Orders require sites to develop waste minimization/pollution prevention programs. In response to these requirements, the Kansas City Plant developed a pollution prevention tool called a pollution prevention opportunity assessment (PPOA). Pilot assessments resulted in the development of a graded approach to reduce the amount of effort required for activities that utilized nonhazardous and/or low-volume waste streams. The project`s objectives in FY95 were to validate DOE`s PPOA Graded Approach methodology, provide PPOA training and technical assistance to interested DOE personnel and DOE contractors, enhance the methodology with energy analysis and tools for environmental restoration activities, implement a DOE-wide PPOA database, and provide support to DOE EM-334 in the completion of a report which estimates the future potential for pollution prevention and waste minimization in the DOE complex.

  14. The selection of construction sub-contractors using the fuzzy sets theory

    Energy Technology Data Exchange (ETDEWEB)

    Krzemiński, Michał [Warsaw University of Technology, Faculty of Civil Engineering, Institute of Building Engineering, The Division of Production Engineering and Construction Management, Al. Armii Ludowej 16, 00-637 Warsaw (Poland)

    2015-03-10

    The paper presents the algorithm for the selection of sub-contractors. Main area of author’s interest is scheduling flow models. The ranking task aims at execution time as short as possible Brigades downtime should also be as small as possible. These targets are exposed to significant obsolescence. The criteria for selection of subcontractors will not be therefore time and cost, it is assumed that all those criteria be meet by sub-contractors. The decision should be made in regard to factors difficult to measure, to assess which is the perfect application of fuzzy sets theory. The paper will present a set of evaluation criteria, the part of the knowledge base and a description of the output variable.

  15. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors

    Energy Technology Data Exchange (ETDEWEB)

    Pemberton, S.

    1995-01-01

    One of the tools used in a successful pollution prevention program is a pollution prevention opportunity assessment (PPOA). The purpose of this project was to share the Kansas City Plant`s (KCP`s) PPOA expertise with other Department of Energy (DOE) personnel and DOE contractors. This consisted of five major activities in FY94: (1) Validating DOE`s PPOA Graded Approach methodology; (2) Providing DOE-funded PPOA training and technical assistance to interested DOE personnel and DOE contractors; (3) Developing a promotional campaign; (4) Conducting a feasibility study to develop a DOE-wide PPOA information exchange mechanism; and (5) Organizing and coordinating information sharing among related DOE EM-334 pollution prevention projects. This report documents the FY94 efforts, lessons learned, and future plans for all of the PPOA-related activities.

  16. Locational Factors and Foreign Market-entry Considerations for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    A.R Abdul_Aziz

    2012-11-01

    Full Text Available Past studies on contractor internationalisation adopt a unimodelapproach. Taking up the call of a few scholars, a study isconducted, this time by integrating several extant models of fi rminternationalisation. Malaysian international contractors are usedto test this approach. Due to space limitation, this paper is focusedonly on locational factors. It begins by justifying the inclusion oflocational factors in a multi-model approach. Then it posits thatlocational disadvantage is a more intellectually appealing conceptthan locational advantages. Empirically, it shows that the surveyedcontractors evaluate a wide range of factors before making thego/no go decision to enter foreign markets. It also shows thatpsychic distance was not their major concern. Finally, the locationaldisadvantages create a market space for international contractorswith the tenacity to overcome them, which the sampled populationpossessed.

  17. Analyzing Design Heating Loads in Superinsulated Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Arena, Lois [Consortium for Advanced Residential Buildings, Norwalk, CT (United States)

    2015-06-16

    The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings (CARB) worked with the EcoVillage cohousing community in Ithaca, New York, on the Third Residential EcoVillage Experience neighborhood. This communityscale project consists of 40 housing units—15 apartments and 25 single-family residences. Units range in size from 450 ft2 to 1,664 ft2 and cost from $80,000 for a studio apartment to $235,000 for a three- or four-bedroom single-family home. For the research component of this project, CARB analyzed current heating system sizing methods for superinsulated homes in cold climates to determine if changes in building load calculation methodology should be recommended. Actual heating energy use was monitored and compared to results from the Air Conditioning Contractors of America’s Manual J8 (MJ8) and the Passive House Planning Package software. Results from that research indicate that MJ8 significantly oversizes heating systems for superinsulated homes and that thermal inertia and internal gains should be considered for more accurate load calculations.

  18. Competitiveness Analysis of Top International Contractors Based on Niche Theory%基于生态位理论的国际承包商竞争力研究

    Institute of Scientific and Technical Information of China (English)

    鲁娜; 林艺馨

    2013-01-01

      基于组织生态学视角,采用2011年度国际建筑市场顶级225家承包商数据,对我国的国际承包商生态位及竞争力进行研究。结果表明我国顶级承包商在国际建筑市场上占有重要市场份额,在国际建筑市场的发展上具有举足轻重的地位,实力不断增强,总体来讲处于竞争优势地位;主要涉足领域包括房屋建筑、能源、交通等传统行业,而对于工业和电讯方面涉及较少,处于竞争劣势地位。针对此情况为中国承包商在拓展国际建筑市场方面提供建议。%From the perspective of organizational ecology,the study adopts the data of the top 225 ENR international contractors to study the niche of Chinese international contractors and their Competitiveness. The results show that Chinese international contractors have played an increasingly important role in the international construction market,i.e. we are in Competition Advantage Stage. The main areas involved in are traditional industries such as building,power,and transportation. But for industries such as industrial process,telecommunications,we are at a competition disadvantage stage. At last,several advices of expanding international market are proposed for Chinese international contractors according to the above situations.

  19. A Study on the Criteria for Branding Contractor Construction Sector Companies in Turkey

    OpenAIRE

    Seher ÇAKO

    2012-01-01

    Today, corporate brand is also important for companies that participate in the construction industry as with all companies. Corporate culture of construction companies, marketing and contact points of view, characteristics of products or services, provide the required quality standards, out of the institution professional services, to follow the technology and research and development work are very important to create institution’s brand value. In this study, contractor in the construction se...

  20. Employee or independent contractor? A summary of court, umpire and referee decisions relating to employee status

    International Nuclear Information System (INIS)

    Nine case examples of disputes regarding the distinction between contractor personnel and employee status were presented. The cases involved people hired for services by Sunstar Uniforms Inc., S.A.M. Distributors, Malibu Homes Construction Ltd., Perfect Drywall Co. Ltd., Tim Horton's, Badger Mechanical Services Whitecourt Ltd., Hostage Musical Group, a chocolate bar seller in Regina, and Normatec Consultants Inc. This presentation described the disputes for each unique case and presented the outcome as decided by the courts

  1. Is Late or Non-Payment a Significant Problem to Malaysian Contractors?

    Directory of Open Access Journals (Sweden)

    M.E. Che Munaaim

    2007-12-01

    Full Text Available Some developed countries have drawn lip construction-specific statutory security of payment acts/legislations typically known as Construction Contracts Act to eliminate poor payment practices and to assist continuous uninterrupted construction works. Malaysia too cannot pretend not to have these problems. This paper presents findings of a study conducted amongst Malaysian contractors with the aims to determine the seriousness of late and non- payment problems; to identify the main causes and effects of late and non-payment; and to identify ways to sustain the payment flows in the Malaysian construction industry. The study focused on contractual payments from the paymaster (government or private to the contractors. The main factors for late and nonpayment in the construction industry identified from the study include: delay in certification, paymaster's poor financial management, local culture/attitude, pay master's failure to implement good governance in business, underpayment of certified amounts by the pay master and the use of 'pay when paid' clauses in contracts. The research findings show that late and non-payment can create cash flow problems, stress and financial hardship on the contractors. Amongst the most appropriate solutions to overcome the problem of late and non-payment faced by local contractors include: a right to regular periodic payment, a right to a defined time frame (or payment and a right to a speedy dispute resolution mechanism. Promptness of submitting, processing, issuing interim payment certificates and honouring the certificates are extremely important issues in relation to progress payment claims. Perhaps, an increased sense of professionalism in construction industry could overcome some of the problems related to late and non- payment issues.

  2. Game analysis and benefit allocation in international projects among owner, supervisor and contractor

    Science.gov (United States)

    Ding, Hao; Wang, Yong; Guo, Sini; Xu, Xiaofeng; Che, Cheng

    2016-04-01

    International projects are different from general domestic ones. In order to analyse the differences, a tripartite game model is built up to describe the relationship among owner, supervisor and general contractor, and some measures are given for the owner to more effectively complete the project. In addition, a project schedule selection model is formulated and a new benefit allocation method is proposed by introducing a new modified Shapley value with weighted factor.

  3. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  4. South African private security contractors active in armed conflicts: citizenship, prosecution and the right to work

    OpenAIRE

    Maritz, M.; Bosch, S.

    2011-01-01

    South Africa has adopted two pieces of legislation since 1998 aimed at restricting one of the fastest growing sectors of the global economy: the private security industry. Not only is this legislation completely unique, but it appears wholly at odds with international opinion. In this article we place private security contractors (PSCs) under the microscope of international law, exploring the role they play in armed conflicts, and the status afforded them by international humanitarian law (IH...

  5. Radiation exposures for DOE and DOE contractor employees - 1991. Twenty-fourth annual report

    International Nuclear Information System (INIS)

    This is the 24th annual radiation exposure report published by US DOE and its predecessor agencies. This report summarizes the radiation exposures received by both employees and visitors at DOE and COE contractor facilities during 1991. Trends in radiations exposures are evaluated. The significance of the doses is addressed by comparing them to the DOE limits and by correlating the doses to health risks based on risk estimates from expert groups

  6. RELATIONAL NETWORK, ABSORPTION CAPACITY AND ACCESS TO EXTERNAL RESOURCES BY TUNISIAN CONTRACTORS

    OpenAIRE

    Adel Ghodbane; Habib Affes

    2015-01-01

    This paper will try to analyze the impact of relational network characteristics on the absorption capacity and the external resources of contractors. The originality of our approach lies in the choice of the context in which our empirical analysis is applied, and relative to the Tunisian context. In addition, a range of theoretical approaches are integrated that have examined the links between absorption capacity and relational network.

  7. Analyses of quality control samples at EML and a contractor laboratory during 1981

    International Nuclear Information System (INIS)

    Sets of biological and fallout samples analyzed at Environmental Measurements Laboratory (EML) and by contractor laboratories include quality control samples which are usually submitted as blinds. These checks consist of blanks, reference samples analyzed repeatedly over a period of years, replicates or splits of unknowns, spikes, and duplicate samplings. Quality control data are summarized for ashed bone, ashed foods, tap water, deposition, and resin samples analyzed for Sr-90, Cs-137 and Ca during 1981

  8. Analyses of quality control samples at EML and contractor laboratories during 1978

    International Nuclear Information System (INIS)

    Sets of biological and fallout samples analyzed at EML and by contractor laboratories include quality control samples which are submitted as blinds. These checks consist of blanks, reference samples analyzed repeatedly over a period of years, replicates or splits of unknowns, spikes, and duplicate samplings. This report summarizes quality control data for ashed bone, various ashed foods, tap water, and fallout samples analyzed for Sr-90, Cs-137, Pu-239,240, Am-241, and Ca during 1978

  9. Factors Affecting the Performance of Small Indigenous Contractors in Papau New Guinea

    Directory of Open Access Journals (Sweden)

    Daniel Wasi

    2001-09-01

    Full Text Available Contractors’ performance, amongst other things, has been associated with the high costof public housing in Papua New Guinea. Given that small indigenous contractorsundertake construction of all public housing, this paper investigates the performance ofsmall indigenous contractors.Eight likely factors that affect small indigenous contractors' performance are identifiedfrom the literature. An empirical study is then described aimed at determining how80Page (iv The Australian Journal of Construction Economics and Buildingthese factors affect project cost, time and quality. This comprised a survey conducted inPort Moresby by personally administered questionnaires to a sample of smallindigenous contractors to assess the level of factors associated with the problem of lackof performance. Additionally, the view of each firm concerning the effect of each factoron performance was also obtained. The results show that, with the exception of culture,all the factors are perceived to have an effect of construction performance. It is alsoshown that the incidence of these factors, within the firms surveyed, are quite low. Ofparticular concern is the level of cash flow.

  10. A multimethodology contractor assessment model for facilitating green innovation: the view of energy and environmental protection.

    Science.gov (United States)

    Hsueh, Sung-Lin; Yan, Min-Ren

    2013-01-01

    The trends of the green supply chain are attributed to pressures from the environment and from customers. Green innovation is a practice for creating competitive advantage in sustainable development. To keep up with the changing business environment, the construction industry needs an appropriate assessment tool to examine the intrinsic and extrinsic effects regarding corporate competitive advantage. From the viewpoint of energy and environmental protection, this study combines four scientific methodologies to develop an assessment model for the green innovation of contractors. System dynamics can be used to estimate the future trends for the overall industrial structure and is useful in predicting competitive advantage in the industry. The analytic hierarchy process (AHP) and utility theory focus on the customer's attitude toward risk and are useful for comprehending changes in objective requirements in the environment. Fuzzy logic can simplify complicated intrinsic and extrinsic factors and express them with a number or ratio that is easy to understand. The proposed assessment model can be used as a reference to guide the government in examining the public constructions that qualified green contractors participate in. Additionally, the assessment model serves an indicator of relative competitiveness that can help the general contractor and subcontractor to evaluate themselves and further green innovations. PMID:24311979

  11. Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    The purpose of the Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor is to provide a third-party quantitative and qualitative cost and schedule risk analysis of HNF-1946. The purpose of this Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor (TFC) is to document the results of the risk-based financial analysis of HNF-1946, Programmatic Baseline Summary for Phase 1 Privatization f o r the Tank Farm Contractor (Diediker 2000). This analysis was performed to evaluate how well the proposed baseline meets the U. S. Department of Energy, Office of River Protection (ORP) Letter OO-MSO-009, ''Contract NO. DE-AC06-99RL14047--The US Department of Energy, Office of River Protection (ORP) Mission Planning Guidance for Fiscal Year (FY) 2002--Revision 1'' (Short 2000). The letter requires a confidence level in the baseline schedule that is consistent with the Phase 1A readiness-to-proceed (RTP) assessment conducted in fiscal year (FY) 1998. Because the success of the project depends not only on the budget but also on the schedule, this risk analysis addresses both components of the baseline

  12. 7th Annual NASA/Contractors Conference on Quality and Productivity: "Total Quality Leadership"

    Science.gov (United States)

    1991-01-01

    More than 750 NASA, government, contractor, and academic representatives attended the Seventh Annual NASA/Contractors Conference on Quality and Productivity on October 12-13, 1990, in Grenelefe, Florida. The panel presentations and keynote speeches revolving around the theme of 'Total Quality Leadership' provided a solid base of understanding of the importance, benefits, and principles of total quality management. The implementation of these strategies is critical if we are to effectively pursue our mission of continuous quality improvement and reliability in our products, processess, and services. The annual NASA/contractors conferences serve as catalysts for achieving success in this mission. The conference was highlighted by the announcement of the first recipients of the George M. Low Trophy: NASA's Quality and Excellence Award. My congratulations go out to all nine finalist organizations and to the two recipients of this prestigious honor: Rockwell Space Systems Division and Marotta Scientific Controls, Inc. (the first small business to achieve this honor). These organizations have demonstrated a commitment to quality that is unsurpassed in the aerospace industry. This report summarizes the presentations and is not intended to be a verbatim proceedings document. You are encouraged to contact the speakers with any requests for further information.

  13. Eleventh annual report of radiation exposures for DOE and DOE contractor employees

    International Nuclear Information System (INIS)

    In 1968, the US Atomic Energy Commission (AEC) established a program for reporting certain occupationa radiation exposure information to a central radiation records repository maintained at the Union Carbide Computing Technology Center, Oak Ridge, Tennessee. Annual summaries (WASH-1350-R1 through WASH-1350-R6) were reported for the years 1968-1973 and included data on AEC contracter employees as well as employees of companies in the private sector licensed by the AEC. In January 1975, the operational functions of the AEC, including the maintenance of records on the occupational radiation exposure on contractor employees, were transferred to the Energy Research and Development Administration (ERDA) and the AEC's regulatory functions, including the reporting of information on the occupational radiation exposure of licenses, were transferred to the Nuclear Regulatory Commission (NRC). Previous AEC licenses then reported to NRC while the contractors reported to ERDA. On October 1, 1977, the Department of Energy (DOE) was formed and assumed the responsibilities of ERDA. This report contains the 1978 radiation exposure data for DOE and DOE contractors

  14. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  15. Radiation exposures for DOE and DOE contractor employees, 1982. Fifteenth annual report

    International Nuclear Information System (INIS)

    All Department of Energy (DOE) and DOE contractors are required to submit occupational exposure records to a central repository. The data required includes a summary of whole-body exposures to ionizing radiation, a summary of internal depositions of radioactive materials above specified limits, and occupational exposure reports for terminating employees. This report is a summary of the data submitted by DOE and DOE contractors for 1982. A total of 85,324 DOE and DOE contractor employees were monitored for whole-body ionizing radiation exposures in 1982. In addition to the employees, 87,262 visitors were monitored. Of all employees monitored, 57.4% received a dose equivalent that was less than measurable, 41.0% a measurable exposure less than 1 rem, and 1.6% an exposure greater than 1 rem. The exposure received by 86.5% of the visitors to DOE facilities was less than measurable. Only 13.5% of the visitors received a measurable exposure less than 1 rem, and < 0.01% of the visitors received an exposure greater than 1 rem. No employees or visitors received a dose equivalent greater than 5 rem

  16. Causes of Contractor's Business Failure in Developing Countries: The Case of Palestine

    Directory of Open Access Journals (Sweden)

    Sherif Mohamed

    2006-12-01

    Full Text Available The construction industry has unique characteristics that sharply distinguish it from other sectors of the economy. It is fragmented, very sensitive to the economic cycles and political environment, and has a significantly high rate of business failure. Business failure, collapse and bankruptcy are common terms in the industry due to the many risks inherited in how the industry operates. Throughout the world, the relative ease of entry gives rise to a large number of contracting firms competing fiercely in the market exposing many of them to business failure, Palestine is no exception. The objectives of this paper are to report on a research study which aims at exploring the causes of contractor's business failure in Palestine, and investigating their severity from the contractor's point of view. The study's results shows that the main causes of business failure are delay in collecting debt from clients (donors, border closure, heavy dependence on bank loans and payment of high interest on these loans, lack of capital, absence of industry regulations, low profit margin due to high competition, awarding contracts by client to the lowest bidder, and lack of experience in contract management. Based on these findings, recommendations to the Palestinian National Authority (PNA and local contractors are presented in this paper.

  17. Sustainable Buildings in Interaction

    DEFF Research Database (Denmark)

    Elle, Morten

    developments are going to consist of passive houses. The first sustainable buildings were built by their users, and the user – building interaction still play a decisive role for the performance of the present sustainable buildings. The users have to understand how the building functions. Urban design is...... essential for the possibilities of a sustainable building design: orientation and access to infrastructure are important factor. And the building design is decisive in making the city truly compact: dense in activities. In future, the interaction between the technical infrastructure, the buildings and their......The first attempts to build sustainable buildings in Denmark were typically located on the countryside. The basic idea was to create buildings that were independent of the technical infrastructure. District heating has, however, been the dominating solution to heating in buildings in Denmark, and...

  18. Measure Guideline: Steam System Balancing and Tuning for Multifamily Residential Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Choi, J.; Ludwig, P.; Brand, L.

    2013-04-01

    This report was written as a resource for professionals involved in multifamily audits, retrofit delivery, and program design, as well as for building owners and contractors. It is intended to serve as a guide for those looking to evaluate and improve the efficiency and operation of one-pipe steam heating systems. In centrally heated multifamily buildings with steam or hydronic systems, the cost of heat for tenants is typically absorbed into the owner's operating costs. Highly variable and rising energy costs have placed a heavy burden on landlords. In the absence of well-designed and relevant efficiency efforts, increased operating costs would be passed on to tenants who often cannot afford those increases. Misinvestment is a common problem with older heating systems -- multiple contractors may inadequately or inappropriately upgrade parts of systems and reduce system functionality and efficiency, or the system has not been properly maintained.

  19. Global Building Physics

    DEFF Research Database (Denmark)

    Rode, Carsten

    2012-01-01

    aspects of the building as defined in building engineering. We live in an international society and building solutions are developed across country borders. Building physics is a global theme. The International Association of Building Physics has global appeal. The keynote lecture and this brief paper......High ambitions are set for the building physics performance of buildings today. No single technology can achieve fulfilment of these ambitions alone. Integrated, multi-facetted solutions and optimization are necessary. A holistic, or “global”, technological perspective is needed, which includes all...

  20. Global building physics

    DEFF Research Database (Denmark)

    Rode, Carsten

    2013-01-01

    aspects of the building as defined in building engineering. We live in an international society and building solutions are developed across country borders. Building physics is a global theme. The International Association of Building Physics has global appeal. This brief article reports the keynote......High ambitions are set for the building physics performance of buildings today. No single technology can achieve fulfilment of these ambitions alone. Integrated, multi-facetted solutions and optimization are necessary. A holistic, or ‘global’, technological perspective is needed, which includes all...

  1. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1 was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  2. Interface agreement for the management of 308 Building Spent Nuclear Fuel. Revision 1

    International Nuclear Information System (INIS)

    The Hanford Site Spent Nuclear Fuel (SNF) Project was formed to manage the SNF at Hanford. Specifically, the mission of the SNF Project on the Hanford Site is to ''provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it for final disposition.'' The current mission of the Fuel Fabrication Facilities Transition Project (FFFTP) is to transition the 308 Building for turn over to the Environmental Restoration Contractor for decontamination and decommissioning

  3. Integrating Building Information Modeling and Health and Safety for Onsite Construction

    OpenAIRE

    Ganah, Abdulkadir; John, Godfaurd A.

    2014-01-01

    Background Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods In addition to an extensive literature review, a questionna...

  4. Colorado Better Buildings Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  5. Retrofitting Listed Buildings

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2011-01-01

    The paper presents a case study where the energy demand for a listed building constructed in 1900 is reduced. Many older buildings are listed and have restrictions that include the entire building or that include only its exterior. For the building presented, only its exterior facade is listed. The...... the local urban environment and therefore listed. The reduced energy demand, related to individual measures, is estimated and building physics requirements are addressed together with the economic options for evaluating the profitability....

  6. Contractors' Perception of factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2010-12-01

    Full Text Available Delay in construction projects is a situation where the project cannot be completed under the planned time. It is a common issue faced in the construction industry all over the world especially in developing countries. In the Malaysian construction industry, 17.3% of construction projects experience more than 3 months delay and some of them are abandoned. Hence, the study of factors contributing to delay is very important in order to reduce the number of projects that experience delay in project delivery. Three objectives of the research have been formulated, namely (1 to identify factors that contribute to delay in construction projects; (2 to analyse and rank the causes of delay rated by contractors; and (3 to study the effects of delay in construction projects. One hundred questionnaires were distributed during data collection stage and only 36 responses received. The respondents only consist of contractors and sub-contractors because the scope of the research focuses on contractors' perception. The data collected was analysed using SPSS software. Seven factors that contribute to delay were identified through literature review, namely contractors' financial difficulties, construction mistakes and defective work, labour shortage, coordination problems, shortage of tools and equipment, material shortage and poor site management. Of those factors, the three most important factors were found to be labour shortage, contractors' financial difficulties and construction mistakes and defective works. Besides project delay, the research shows that cost overrun and extension of time (EOT are the most common effects of delay in construction projects.

  7. Energy consumption in office buildings. Trends and drivers; Energibruk i kontorbygg. Trender og drivere

    Energy Technology Data Exchange (ETDEWEB)

    Langseth, Benedicte

    2013-02-01

    This report focuses on the energy usage of Norwegian office buildings. Historic data on the subject is limited, so qualitative input is gathered through interviews with property owners and contractors for energy solutions. We have looked at what affects the total area of office buildings in Norway, and realized that it more or less follows the inland gross domestic product. The report also includes cross-sectional analyses from various data sources to find what affects the specific energy usage of office buildings. The actual measured consumption deviates from estimated consumption, especially in newer buildings and especially within ventilation and cooling. Additionally, a model has been developed for projective purposes. It is well suited to test the effect of various input parameters and assumptions on the total area of office buildings and their energy consumption. Though as of yet the quality of data is not good enough to make a profound and credible estimate of total energy usage.(eb)

  8. Legal Aspects Connected to the Use of BIM in the Danish Building Sector

    DEFF Research Database (Denmark)

    Faber, Lene; Svidt, Kjeld; Wandahl, Søren

    2016-01-01

    In 2013, the Danish government implemented a declaration for the use of information and communication technology in governmental buildings (ICTdeclaration). This has led to an increasing number of building projects using building information modeling (BIM) with potentially better productivity and...... of dispute in correlation to existing contractual terms i.e. displacement of traditional areas of responsibility, risks, legitimate trust to the building models and obscurity about ownership to digital information. This case study identifies several potential barriers for using BIM in the Danish...... Building Sector in the existing legislation as well as in the existing contractual terms. There is legal uncertainty connected to the use of BIM. There is no legal practice in the BIM area that refrains the contractors from achieving a maximum of advantage using BIM. BIM gives rise to interpreting the...

  9. Importance of Building Code

    Directory of Open Access Journals (Sweden)

    Reshmi Banerjee

    2015-06-01

    Full Text Available A building code, or building control, is a set of rules that specify the minimum standards for constructed objects such as buildings and non building structures. The main purpose of building codes are to protect public health, safety and general welfare as they relate to the construction and occupancy of buildings and structures. The building code becomes law of a particular jurisdiction when formally enacted by the appropriate governmental or private authority. Building codes are generally intended to be applied by architects, engineers, constructors and regulators but are also used for various purposes by safety inspectors, environmental scientists, real estate developers, subcontractors, manufacturers of building products and materials, insurance companies, facility managers, tenants and others.

  10. Sustainable Buildings in Interaction

    DEFF Research Database (Denmark)

    Elle, Morten

    The first attempts to build sustainable buildings in Denmark were typically located on the countryside. The basic idea was to create buildings that were independent of the technical infrastructure. District heating has, however, been the dominating solution to heating in buildings in Denmark, and...... the focus on sustainable building have gradually turned from special houses on the countryside to normally looking houses in the urban fabric, integrated in the technical infrastructure. Some new built urban areas in Denmark will, however, not have to be supplied with district heating – these...... developments are going to consist of passive houses. The first sustainable buildings were built by their users, and the user – building interaction still play a decisive role for the performance of the present sustainable buildings. The users have to understand how the building functions. Urban design is...

  11. FINAL REPORT –INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS

    Energy Technology Data Exchange (ETDEWEB)

    ERIKA N. BAILEY

    2012-02-29

    ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

  12. A method for optimizing the performance of buildings

    Energy Technology Data Exchange (ETDEWEB)

    Pedersen, Frank

    2006-07-01

    This thesis describes a method for optimizing the performance of buildings. Design decisions made in early stages of the building design process have a significant impact on the performance of buildings, for instance, the performance with respect to the energy consumption, economical aspects, and the indoor environment. The method is intended for supporting design decisions for buildings, by combining methods for calculating the performance of buildings with numerical optimization methods. The method is able to find optimum values of decision variables representing different features of the building, such as its shape, the amount and type of windows used, and the amount of insulation used in the building envelope. The parties who influence design decisions for buildings, such as building owners, building users, architects, consulting engineers, contractors, etc., often have different and to some extent conflicting requirements to buildings. For instance, the building owner may be more concerned about the cost of constructing the building, rather than the quality of the indoor climate, which is more likely to be a concern of the building user. In order to support the different types of requirements made by decision-makers for buildings, an optimization problem is formulated, intended for representing a wide range of design decision problems for buildings. The problem formulation involves so-called performance measures, which can be calculated with simulation software for buildings. For instance, the annual amount of energy required by the building, the cost of constructing the building, and the annual number of hours where overheating occurs, can be used as performance measures. The optimization problem enables the decision-makers to specify many different requirements to the decision variables, as well as to the performance of the building. Performance measures can for instance be required to assume their minimum or maximum value, they can be subjected to upper or

  13. Regulatory control of the use of contractors by operating organizations. Peer discussions on regulatory practices

    International Nuclear Information System (INIS)

    This report arises from the eighth series of peer discussions on regulatory practices entitled 'Regulatory control of the use of contractors by operating organizations'. Senior regulators from 19 Member States participated in two peer group discussions in March 2000 and May 2000. This report gives an account of the outcomes of these meetings and of practical suggestions put forward by senior regulators. These suggestions do not necessarily reflect the views of the governments of the nominating Member States, the organizations they belong to, or the International Atomic Energy Agency. The objective of this document is to share experience between regulatory bodies and provide practical suggestions for controlling the use of contractors and subcontractors by the operating organizations during all stages, especially operation, of a nuclear power plant, so as to ensure that the quality of work and services delivered is commensurate with the safety importance of the activities and that these are carried out in a manner that will not adversely affect the safe or reliable operation of the facility. These documented practical suggestions and experiences are the result of a series of peer discussions at the IAEA in 2000. It is considered that the manner in which control is exercised, and the various challenges connected to this control, are highly dependent upon the legislative framework, maturity of the nuclear programme, the size of the national nuclear industry and the culture in each country. The report is structured so that it covers the subject matter under the following main headings: Legal Provisions, Regulatory Strategy and Requirements; Regulatory Approaches for Controlling the Use of Contractors; Types of Contracts; Practical Suggestions

  14. Applied building physics

    CERN Document Server

    Hens, Hugo S L C

    2012-01-01

    The energy crises of the 1970s, persisting moisture problems, complaints about sick buildings, thermal, visual and olfactory discomfort, and the move towards more sustainability in building construction have pushed Building Physics to the forefront of building innovation. The societal pressure to diminish energy consumption in buildings without impairing usability acted as a trigger to activate the whole notion of performance based design and construction. As with all engineering sciences, Building Physics is oriented towards application, which is why, after a first book on fundamentals this s

  15. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    International Nuclear Information System (INIS)

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  16. A contractor's approach to engineering process plant for radioactive liquor processing

    International Nuclear Information System (INIS)

    Protection of personnel from damaging sources of radiation is the overriding consideration which influences the fundamental design of plant for processing active liquors in the Nuclear Industry. The conventional design procedures of the Chemical Plant Contractor have therefore to be modified to meet the specific technology and additional safety requirements. Ways in which the added factor of radiation influences the design philosophy for Nuclear Plant compared to conventional Chemical Plant are described. Design philosophy is demonstrated by design studies for active liquor storage and evaporation plant. (author)

  17. A contractors's approach to engineering process plant for radioactive liquor processing

    International Nuclear Information System (INIS)

    Protection of personnel from damaging sources of radiation is the overriding consideration which influences the fundamental design of plant for processing active liquors in the Nuclear Industry. The conventional design procedures of the Chemical Plant Contractor have therefore to be modified to meet the specific technology and additional safety requirements. This paper describes ways in which the added factor of radiation influences the design philosophy for Nuclear Plant compared to conventional Chemical Plant. The design philosophy is demonstrated by design studies for active liquor storage and evaporation plant. (author)

  18. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  19. Mapping our genes: Federal genome projects: How vast. How fast. : Volume 1, Contractor reports

    Energy Technology Data Exchange (ETDEWEB)

    Reisher, S.R.; Friedmann, T.; Glover, J.; Heilbron, J.L.; Judson, H.F.

    1988-02-01

    This report contains contractor contributions solicited by the US Office of Technology Assessment in support of its recommendations for federal organization of the human genome project. The individual reports contained herein are entitled: Bibliometric analysis of work on human gene mapping; Medical implications of extensive physical and sequence characterization of the human genome; Mapping the human genome: Some implications; Mapping and sequencing the human genome: Considerations from the history of particle accelerators; Mapping the human genome: Historical background; Long-term implications of mapping and sequencing the human genome: Ethical and philosophical implications. Each report is also separately abstracted and indexed for the Energy Data Base. (DT)

  20. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    Energy Technology Data Exchange (ETDEWEB)

    Rowsell, David Leon [Idaho National Laboratory (INL), Idaho Falls, ID (United States)

    2015-06-01

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  1. Access to strategic resources through the relational network of the contractor and innovation of Tunisian SMEs

    Directory of Open Access Journals (Sweden)

    Adel Ghodbane

    2016-04-01

    Full Text Available Our paper is devoted to analyze the mediating effects of the access to strategic resources between the relational network of contractors and innovation in the specific case of Tunisian SMEs. The originality of this approach lies in the effort to show that the detention of a relational network is not synonymous with real access to strategic resources and the realization of benefits in terms of innovation. This finding is particularly important for SMEs which lack the means to profit from their own relational fabrics.

  2. Contingency planning, contractor requirements, and Oil Pollution Act of 1990 implementation

    International Nuclear Information System (INIS)

    In response to widespread public concern, Congress enacted the comprehensive Oil Pollution Act of 1990. This, in addition to legislation enacted by many coastal states, will bring dramatic changes to oil spill response in the United States. This paper considers OPA 90's response planning requirements, the rule-making process for implementing these requirements, and key issues in response planning. It compares the proposed federal requirements with state response planning and contractor requirements. The response planning system faces a long period of adjustment. Sustained efforts will be needed to harmonize the many state antifederal laws and regulations into a coherent, consistent, and understandable response regime

  3. Knotworking – changing the game in the building design processes?

    DEFF Research Database (Denmark)

    Buhl, Henrik; Andersen, Michael; Hvid, Nicolaj

    2015-01-01

    in the build environment work in separate silos, and their mutual interaction is limited to formal meeting activity. Many different actors with occasional interaction of users and developers carry out the design of the building. Both consultant; user/developer -and later contractor - are located at different...... on future construction at an early stage. The Knotworking workshops was the epicenter for our engagement and research, we participated in the workshops as facilitators, so we have played an active role in the Knotworking processes. We have used participatory design methods, for instance used videos...... findings shows that facilitated collaboration between stakeholders, with the usage of BIM/ICT (Knotworking) can gain promising results. To change the game in the construction industry we still need new ideas and perspectives. New ways of working with BIM/ICT - technology driven collaboration - can get...

  4. Advanced Construction Technologies and Further Evolution Towards New Build NPP Projects

    International Nuclear Information System (INIS)

    Shika Nuclear Power Station Unit No.2 began commercial operation in March 2006 as one of the latest new-build projects in the world. Hitachi-GE Nuclear Energy Ltd. (Hitachi) was the main contractor and supplied the entire plant including engineering, manufacturing of all major reactor and turbine-generator components, and executed the installation and commissioning. Hitachi completed the project on schedule and on budget owing in large part to its highly reliable advanced construction technology.This article describes Hitachi's unsurpassed advanced construction technology being applied to the current new-build projects in Japan. (author)

  5. Sustainable Building Operation

    DEFF Research Database (Denmark)

    Jensen, Jesper Ole

    2009-01-01

    practical experiences from Danish housing estates indicates that there are large potentials for energy savings by focusing on the operation of the buildings. We suggest that in order to achieve sustainability in the existing housing, renovation and operations should be seen as integrated parts and that...... sustainable building operation can pave the way for sustainable building renovation. This paper discusses the use of sustainability building operation in Danish housing estates: Which tools, methods and technologies is being used, where are the barriers and where are the potentials? We define sustainable...... sustainable building operation and a survey amongst building administrators from the private and the social housing sector. Our results show that there are many good examples on sustainable building operation in Danish housing estates, where local building managers, residents etc. have gained impressive...

  6. Building the Korogwe Laboratory

    DEFF Research Database (Denmark)

    Knudsen, Jakob; von Seidlein, Lorenz; Richard, Jean Pierre

    2011-01-01

    An illustrated description of the building of a biomedical research laboratory in Korogwe, Tanzania.......An illustrated description of the building of a biomedical research laboratory in Korogwe, Tanzania....

  7. Requirements for existing buildings

    DEFF Research Database (Denmark)

    Thomsen, Kirsten Engelund; Wittchen, Kim Bjarne

    2012-01-01

    This report collects energy performance requirements for existing buildings in European member states by June 2012.......This report collects energy performance requirements for existing buildings in European member states by June 2012....

  8. Better Buildings Challenge Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-06-01

    The Better Buildings Challenge is a national leadership initiative calling on corporate chief executive officers, university presidents, and state and local leaders to make a significant commitment to building energy efficiency.

  9. Environmental indicators for buildings

    DEFF Research Database (Denmark)

    Dammann, Sven

    Environmental Indicators for Buildings are studied using two different perspectives: with a technological, environmental scientific departing point and with a social scientific departing point. Different relevant groups in the building sector are identified and analysed, using the Social...

  10. Robotic buildings(s)

    NARCIS (Netherlands)

    Bier, H.H.

    2014-01-01

    Technological and conceptual advances in fields such as artificial intelligence, robotics, and material science have enabled robotic building to be in the last decade prototypically implemented. In this context, robotic building implies both physically built robotic environments and robotically supp

  11. Integrated Building Health Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Abstract: Building health management is an important part in running an efficient and cost-effective building. Many problems in a building’s system can go...

  12. Building Design & Construction - Sustainability

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-11-01

    Offers a brief history of green building; presents the results of a specially commissioned survey; and analyzes the chief trends, issues, and published research, based on interviews with dozens of experts and participants in green building.

  13. Comfort control in buildings

    CERN Document Server

    Castilla, Maria del Mar; Rodriguez, Francisco de Asis

    2014-01-01

    This book describes both concepts and development of advanced comfort control systems in buildings, with significant energy saving, and attention to thermal, visual and indoor air quality. The concepts are proven through real tests in a bioclimatic building.

  14. Energy performance in buildings

    International Nuclear Information System (INIS)

    The adoption of the building sector regulations strongly oriented to the energy sustainability becomes more effective, also on the economic plan, if placed by one spread of the energetic certification of the buildings

  15. Allegheny County Building Footprints

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset contains photogrammetrically compiled roof outlines of buildings. All near orthogonal corners are square. Buildings that are less than 400 square feet...

  16. Buildings interoperability landscape - Draft

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Dave B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Stephan, Eric G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Corbin, Charles D. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Widergren, Steven E. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2015-02-01

    Buildings are an integral part of our nation’s energy economy. The advancement in information and communications technology (ICT) has revolutionized energy management in industrial facilities and large commercial buildings. As ICT costs decrease and capabilities increase, buildings automation and energy management features are transforming the small-medium commercial and residential buildings sectors. A vision of a connected world in which equipment and systems within buildings coordinate with each other to efficiently meet their owners’ and occupants’ needs, and where buildings regularly transact business with other buildings and service providers (such as gas and electric service providers) is emerging. However, while the technology to support this collaboration has been demonstrated at various degrees of maturity, the integration frameworks and ecosystems of products that support the ability to easily install, maintain, and evolve building systems and their equipment components are struggling to nurture the fledging business propositions of their proponents.

  17. Biological Sciences Building

    OpenAIRE

    Kumaraswamy, Mohan

    2002-01-01

    One element of the CIVCAL project Web-based resources containing images, tables, texts and associated data on the construction of the Biological Sciences Building. The HKU Kadoorie Biological Sciences Building is an 11-storey reinforced concrete framed building with a structural steel arch roof. The building dimensions are approximately 60 metres x 30 metres. The estimated project cost for the superstructure construction (excluding the bored pile foundations) was about HK$ 400 million....

  18. Inspection of administrative management procedures for legal services acquired by selected management and operating contractors

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The initial purpose of this inspection was to evaluate the administrative management of legal services relating to civil litigation acquired by Rockwell International Corporation (Rockwell) under the Management and Operating (M and O) Contract No. DE-AC04-76DP03533. This contract was for the operation of the Rocky Flats Plant, and Rockwell's continuing obligations under this contract are being administered by the Albuquerque Operations Office for the purpose of closing out Rockwell's activities at Rocky Flats. In order to determine whether the findings generally applied to other DOE sites, the auditors also conducted a limited evaluation of the management procedures relating to legal services for three other selected M and O contractors. The purpose of this inspection was to evaluate: (1) Rockwell's acquisition and administration of legal services associated with civil litigation of Rocky Flats under Contract No. DE-AC04-76DP03533, and the processes used by Rockwell and the Albuquerque Operations Office (Albuquerque) for reviewing the cost of these services under DOE's voucher system prior to payment. (2) The acquisition and administration of outside legal services at Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), and Sandia National Laboratories (SNL), Albuquerque. (3) The March 23, 1994, DOE Litigation Management Procedures as they relate to the management to litigation involving Management and Operating contractors.

  19. Licensee contractor and vendor inspection status report. Quarterly report, April 1982-June 1982

    International Nuclear Information System (INIS)

    Firms designing nuclear steam supply systems, architect engineering firms doing design work on nuclear power plants, and certain selected vendors are currently inspected on a regular basis by the NRC. NRC inspectors, during periodic inspections, ascertain through direct observation of selected activities (including review of processes and selected hardware, discussions with employees and selected record review) whether a licensee or contractor is satisfactorily implementing a quality assurance program. If nonconformances with QA commitments are found, the inspected organization is requested to take appropriate corrective action and to institute preventive measures to preclude recurrence. In addition to the QA program inspections, NRC also conducts reactive inspections of the licensee's contractors and vendors. These are special, limited scope inspections to verify that organizations supplying safety-related equipment or services to licensed facilities are exercising appropriate corrective/preventive measures when defects or conditions which could adversely affect the safe operation of such facilities are identified and that these organizations are complying with the NRC requirements which govern the evaluation and reporting of such conditions

  20. Municipal solid waste management: A bibliography of US Department of Energy contractor reports through 1993

    Energy Technology Data Exchange (ETDEWEB)

    Shepherd, P

    1994-07-01

    US Department of Energy contractors continue to conduct research targeting the productive and responsible use of the more than 536,000 tons of municipal solid waste (MSW) that is generated each day in the United States. It is becoming more and more prudent to improve current methods of MSW management and to continue to search for additional cost-effective, energy-efficient means to manage our MSW resource. This bibliography is an updated version of Municipal Waste to Energy: An Annotated Bibliography of US Department of Energy Contractor Reports, by Caroline Brooks, published in 1987. Like its predecessor, this bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US Department of Energy. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment. The bibliography contains three indexes -- an author index, a subject index, and a title index. The reports are listed alphabetically in the subject areas and may appear under more than one subject. All of the reports cited in the original MSW bibliography are also included in this update. The number of copies of each report originally published varied according to anticipated public demand. However, all reports are available in either microfiche or hard copy form and may be ordered from the National Technical Information Service (NTIS), US Department of Commerce, Springfield, VA 22161. Explicit information on ordering reports is included in Appendix A.

  1. Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints

    Directory of Open Access Journals (Sweden)

    Nurbasirah Mohamed Alias

    2013-09-01

    Full Text Available It should be pointed out that the dilemma of interruption and stoppage in the construction industry is a large-scale trend. Construction interruption and stoppage is considered one of the most recurring problems in the construction industry. Construction Interruption and stoppage is always measured as costly to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows the growth of construction sector. The objective of the research work that underpins this paper was to investigate the Factors and Consequences of construction projects on local contractors. A construction project is commonly acknowledged as successful when the aim of the project is achieved in terms of predetermined objectives that are mainly completed the project on time, within budget and specified quality in accordance with the specifications and to stakeholders’ satisfaction. One of the most important problems that may arise in the construction project is delays and the magnitude of these delays varies considerably from project to project. According to delay categories that were contractor related, client related, consultant related, labour related and external related, the study revealed the six major effects of delay that were time overrun, cost overrun, dispute, arbitration, total abandonment, and litigation.

  2. Licensee contractor and vendor inspection status report: Quarterly report, July - September 1997. Volume 21, Number 3

    International Nuclear Information System (INIS)

    A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results if inspections that were performed by the NRC's Special Inspection Branch, Vendor Inspection Section, and that were distributed to the inspected organizations during the period from July through September 1997

  3. Marine Building Technology

    OpenAIRE

    Westby, Ola

    2006-01-01

    This textbook is all about building of ships, platforms and other offshore installations. The geometry and functions of systems and structures are explained as an introduction to management and technology at shipyards and building sites. Both loadbearing structures, outfitting and installation of accommodation are included. Project management, production planning, cost calculations, building methods, discipline knowledge (welding, painting, insulation, mechanical, piping etc.), fabrication te...

  4. ICT Enhanced Buildings Potentials

    DEFF Research Database (Denmark)

    Christiansson, Per

    2007-01-01

    with focus on virtual building models support, new services and user environment definitions and development, virtual spaces and augmented reality, intelligent building components, application ontologies, and ICT systems integration to illustrate ICT enhanced buildings potentials and R&D needs.  ...

  5. Facilitating Collaborative Knowledge Building

    Science.gov (United States)

    Hmelo-Silver, Cindy E.; Barrows, Howard S.

    2008-01-01

    This article describes a detailed analysis of knowledge building in a problem-based learning group. Knowledge building involves increasing the collective knowledge of a group through social discourse. For knowledge building to occur in the classroom, the teacher needs to create opportunities for constructive discourse in order to support student…

  6. Final report of the radiological release survey of Building 19 at the Grand Junction Office Facility

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 19 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building

  7. Final report of the radiological release survey of Building 29 at the Grand Junction Office Facility

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailing during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 29 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building

  8. Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building

  9. Analysis of institutional mechanisms affecting residential and commercial buildings retrofit

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    Barriers to energy conservation in the residential and commercial sectors influence (1) the willingness of building occupants to modify their energy usage habits, and (2) the willingness of building owners/occupants to upgrade the thermal characteristics of the structures within which they live or work and the appliances which they use. The barriers that influence the willingness of building owners/occupants to modify the thermal efficiency characteristics of building structures and heating/cooling systems are discussed. This focus is further narrowed to include only those barriers that impede modifications to existing buildings, i.e., energy conservation retrofit activity. Eight barriers selected for their suitability for Federal action in the residential and commercial sectors and examined are: fuel pricing policies that in the short term do not provide enough incentive to invest in energy conservation; high finance cost; inability to evaluate contractor performance; inability to evaluate retrofit products; lack of well-integrated or one-stop marketing systems (referred to as lack of delivery systems); lack of precise or customized information; lack of sociological/psychological incentives; and use of the first-cost decision criterion (expanded to include short-term payback criterion for the commercial sector). The impacts of these barriers on energy conservation are separately assessed for the residential and commercial sectors.

  10. Building Order in the Building Company Organization

    OpenAIRE

    Krivdová, Magdaléna

    2013-01-01

    The aim of the thesis is to describe an organization of a building order, and to show its key phases. The individual phases of how a order is completed in a company are shown on practical examples. The first two chapters deal with the current situation of today's construction industry; consequently, the reasons for introducing the principles of project management into the construction business practice are mentioned. The third chapter is devoted to the description of a building order. It...

  11. Integrated building design

    Science.gov (United States)

    Sanguinetti, Jennifer

    2005-04-01

    For many years, building design has been a very linear process with owners speaking to architects who then design building shells that they pass along to sub-consultants who must fit their systems into the allotted spaces. While this process has some advantages, it provides little opportunity to optimize systems based on such factors as energy use or occupant comfort. This presentation will focus on the evolution and implications of integrated building design, a method that has provided greater opportunities for interaction between design disciplines and with building users early on in the design process. Integration has resulted in buildings that are more sustainable than typical buildings and that can respond better to the needs of the owner and users. Examples of the application of the process and the resulting buildings will be presented from the view of a design engineer with experience of both processes. Specifically, the potential contribution of an acoustical consultant in the integrated process will be explored.

  12. Commercial Buildings Characteristics, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-29

    Commercial Buildings Characteristics 1992 presents statistics about the number, type, and size of commercial buildings in the United States as well as their energy-related characteristics. These data are collected in the Commercial Buildings Energy Consumption Survey (CBECS), a national survey of buildings in the commercial sector. The 1992 CBECS is the fifth in a series conducted since 1979 by the Energy Information Administration. Approximately 6,600 commercial buildings were surveyed, representing the characteristics and energy consumption of 4.8 million commercial buildings and 67.9 billion square feet of commercial floorspace nationwide. Overall, the amount of commercial floorspace in the United States increased an average of 2.4 percent annually between 1989 and 1992, while the number of commercial buildings increased an average of 2.0 percent annually.

  13. Process waste assessment approach, training and technical assistance for DOE contractors; FY93 report, ADS {number_sign}35303C

    Energy Technology Data Exchange (ETDEWEB)

    Pemberton, S

    1994-03-01

    The Department of Energy (DOE) and its contractors are faced with a large waste management problem as are other industries. One of the tools used in a successful waste minimization pollution prevention (WMin/P2) program is a process waste assessment (PWA). The purpose of this project was to share the Kansas City Plant`s (KCP`s) PWA expertise with other DOE personnel and DOE contractors. This consisted of two major activities: (1) The KCP`s PWA graded approach methodology was modified with the assistance of DOE/Defense Program`s laboratories, and (2) PWA training and technical assistance were provided to interested DOE personnel and DOE contractors. This report documents the FY93 efforts, lesson learned, and future plans for both PWA-related activities.

  14. Project W-519 CDR supplement: Raw water and electrical services for privatization contractor, AP tank farm operations

    International Nuclear Information System (INIS)

    This supplement to the Project W-519 Conceptual Design will identify a means to provide RW and Electrical services to serve the needs of the TWRS Privatization Contractor (PC) at AP Tank Farm as directed by DOE-RL. The RW will serve the fire suppression and untreated process water requirements for the PC. The purpose of this CDR supplement is to identify Raw Water (RW) and Electrical service line routes to the TWRS Privatization Contractor (PC) feed delivery tanks, AP-106 and/or AP-108, and establish associated cost impacts to the Project W-519 baseline

  15. Building for animal production

    International Nuclear Information System (INIS)

    In order to limit the radiation dose to persons working with animal husbandry in severe fallout situations, it was considered necessary to make an inventory of the Swedish livestock buildings as to number, location, use and size. These data as well as data on geometry of buildings, building material and thickness of the material in walls and roofs are given in the present work. On the basis of the mentioned data, calculations were made of the shielding factors of different types of livestock buildings. The collected data can also be used in preparedness planning in relation to housing facilities for livestock and location and size of animal production in situations of crises or war. The calculations show shielding factors for different types of livestock buildings of normal ground area within the range of 0.18-0.71. The higher value indicates a fairly poor shielding effect. The inventory and the calculations show that in those regions in Sweden where the main part of the livestock is managed, the types of buildings are, however, characterized by radiation shielding factors of 0.3-0.4. Calculation were also made of the radiation level inside the buildings following decontamination of roofs or of surrounding ground. Ground decontamination only, i.e., removal of the upper contaminated surface layer, will reduce the radiation level inside the building. For most buildings the radius of the surrounding area to be decontaminated has to be 15-30 times larger than the width of the building in order to achieve a 50 percentage reduction of the radiation level inside the building. For buildings of medium or large size and with thick walls the radiation contribution from the roof is greater than the radiation from the ground, and regardless of the size of the ground areas decontaminated the radiation level inside these buildings will only be reduced by 20-30%. 15 refs, 11 figs, 14 tabs

  16. Evaluation of safety assessment methodologies in Rocky Flats Risk Assessment Guide (1985) and Building 707 Final Safety Analysis Report (1987)

    International Nuclear Information System (INIS)

    FSARs. Rockwell International, as operating contractor at the Rocky Flats plant, conducted a safety analysis program during the 1980s. That effort resulted in Final Safety Analysis Reports (FSARs) for several buildings, one of them being the Building 707 Final Safety Analysis Report, June 87 (707FSAR) and a Plant Safety Analysis Report. Rocky Flats Risk Assessment Guide, March 1985 (RFRAG85) documents the methodologies that were used for those FSARs. Resources available for preparation of those Rocky Flats FSARs were very limited. After addressing the more pressing safety issues, some of which are described below, the present contractor (EG ampersand G) intends to conduct a program of upgrading the FSARs. This report presents the results of a review of the methodologies described in RFRAG85 and 707FSAR and contains suggestions that might be incorporated into the methodology for the FSAR upgrade effort

  17. Municipal solid waste management: A bibliography of US Department of Energy contractor report through 1994

    Energy Technology Data Exchange (ETDEWEB)

    None

    1995-09-01

    U.S. Department of Energy contractors continue to conduct research targeting the productive and responsible use of the more than 516,000 metric tons (567,000 tons) of municipal solid waste (MSW) that is generated each day in the United States. It is becoming more and more prudent to improve current methods of MSW management and to continue to search for additional cost-effective, energy-efficient means to manage our MSW resource. This bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US DOE. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment.

  18. How organisational behaviours and human factors can positively impact contractors to nuclear power plants

    International Nuclear Information System (INIS)

    Organisational behaviours have a significant impact on individual and group behaviours but are frequently ignored during the design, planning and scheduling of work or when conducting an investigation of events. Why should it matter? It is important to calculate the personal and organisational impact and cost of those elements which contribute to organisational safety. We look at two nuclear contractor organisations (one in Spain and one in the UK) that are actively making a positive difference to their behaviours in a commercial nuclear environment. They are creating a better business environment for their staff, and a robust business differentiator for future work with their clients. We consider what the cost and impact is of the changes they have made to their organisational behaviours.

  19. Current information technology needs of small to medium sized apparel manufacturers and contractors

    Energy Technology Data Exchange (ETDEWEB)

    Wimple, C., LLNL

    1998-04-01

    This report documents recent efforts of the American Textile Partnership (AMTEX{sup TM}) Demand Activated Manufacturing Architecture (DAMA) Project to identify opportunities for cost effective enhanced information technology use by small to medium sized apparel manufacturers and contractors. Background on the AMTEX/DAMA project and objectives for the specific DAMA Small and Medium Enterprise (SME) effort are discussed in this section. The approach used to gather information about current opportunities or needs is outlined in Section 2 Approach, and relevant findings are identified and a brief analysis of the information gathered is presented in Section 3 Findings. Recommendations based on the analysis, are offered in Section 4 Recommendations, and plans are suggested for DAMA follow-on in Section 5 Future Plans. Trip reports for each of the companies visited are contained in Appendix E - Company Trip Reports. These individual reports contain the data upon which the analysis presented in Section 3 Findings is based.

  20. Inclusion survey contractor implementation plan for fiscal years 1986-1988

    International Nuclear Information System (INIS)

    The Radiological Surveys Activities Group (RASA) of Oak Ridge National Laboratory acts as the Inclusion Survey Contractor (ISC) to the Uranium Mill Tailings Remedial Action (UMTRA) Project of the US Department of Energy (DOE). The ISC investigates properties to determine whether the properties qualify for remedial action according to the standards set forth for the UMTRA Project by the US Environmental Protection Agency. The major work elements making up the ISC's activities are: consent form acquisition, land survey/drawing, inclusion survey, post-survey activities, survey report, file transmittal, and recommendation for a vicinity property to be included into or excluded from UMTRAP. The ISC will produce 2960 recommendations in FY 1988 for $3.98M

  1. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    International Nuclear Information System (INIS)

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study of actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980

  2. Radiation exposures for DOE [Department of Energy] and DOE contractor employees, 1988

    International Nuclear Information System (INIS)

    This is the 21st in a series of annual radiation exposure reports published by the Department of Energy (DOE) or its predecessors. This report summarizes the radiation exposures received at DOE and DOE contractor facilities in 1988. Radiation exposures to both employees and visitors are included. Trends in radiation exposures are evaluated by comparing the doses received in 1988 to those received in previous years. The significance of the doses is addressed by comparing them to the DOE limits and by correlating the doses to health risks based on risk estimates from expert groups. This report represents a significant advancement from previous reports because it is the first for which detailed exposure data are available for each individual monitored at a DOE facility. This reports contains information on different types of radiation doses, such as penetrating, shallow, and neutron doses. It also contains analysis of exposures by age, sex, and occupation of the exposed individuals. This report is the first of any federal organization that presents such detailed exposure data. The purpose of this report is to disseminate information regarding radiation exposures received at US Department of Energy (DOE) and DOE contractor facilities. The primary purpose of this practice is to ensure that the DOE occupational dose limits are not exceeded and that as low as reasonably achievable (ALARA) goals are met. A secondary purpose, however, is to provide information that can be used by other organizations and individuals who wish to collect and analyze such information. This information may be useful for estimating the effect of changing dose limits on operations at DOE facilities, determining the progress of DOE with respect to the ALARA principle, or, in combination with epidemiological information, assisting researchers in determining whether or not low doses of ionizing radiation are harmful. 23 refs., 20 figs., 23 tabs

  3. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study of actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.

  4. [Epidemiology of "sick buildings"].

    Science.gov (United States)

    Sterling, T D; Collett, C; Rumel, D

    1991-02-01

    The indoor environment of modern buildings, especially those designed for commercial and administrative purposes, constitutes a unique ecological niche with its own biochemical environment, fauna and flora. Sophisticated construction methods and the new materials and machinery required to maintain the indoor environment of these enclosed structures produce a large number of chemical by-products and permit the growth of many different microorganisms. Because modern office buildings are sealed, the regulation of humidification and temperature of ducted air presents a dilemma, since difference species of microorganisms flourish at different combinations of humidity and temperature. If the indoor environment of modern office buildings is not properly maintained, the environment may become harmful to its occupants' health. Such buildings are classified as "Sick Buildings". A review of the epidemiology of building illness is presented. The etiology of occupant illnesses, sources of toxic substances, and possible methods of maintaining a safe indoor environment are described. PMID:1784964

  5. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  6. Development of Ecological Buildings

    Directory of Open Access Journals (Sweden)

    Andrius Keizikas

    2011-04-01

    Full Text Available The article presents research on ecological buildings and their influence on the constructional sphere. The aim of the paper is to reveal the essence of ecological architecture showing substantial progress and its potential to stimulate architectural and technological growth. The article also describes relations between the ideas of ecological buildings and the ‘passive house’ concepts and aspects of development as well as describes the possibilities of improving building sustainability and energy efficiency. Article in Lithuanian

  7. Radon in buildings

    International Nuclear Information System (INIS)

    This guide is intended to inform designers, householders and other building owners about the radon problem and to help in deciding if there is need to take any action to reduce radon levels in their homes or other buildings.It explains what radon is, how it enters buildings and what effect it may have on health. Reference is made to some of the usual ways of reducing the level of radon and guidance is given on some sources of assistance

  8. Building valve amplifiers

    CERN Document Server

    Jones, Morgan

    2013-01-01

    Building Valve Amplifiers is a unique hands-on guide for anyone working with tube audio equipment--as an electronics hobbyist, audiophile or audio engineer. This 2nd Edition builds on the success of the first with technology and technique revisions throughout and, significantly, a major new self-build project, worked through step-by-step, which puts into practice the principles and techniques introduced throughout the book. Particular attention has been paid to answering questions commonly asked by newcomers to the world of the valve, whether audio enthusiasts tackling their first build or

  9. Sick building syndrome

    Directory of Open Access Journals (Sweden)

    Tjandra Y. Aditama

    2002-06-01

    Full Text Available Sick building syndrome describes a number of mostly unspesific complaints of some occupants of the building. The exact pathophysiological mechanism remains elusive. It is a multi factorial event which may include physical, chemical, biological as well as psycological factors. In many cases it is due to insufficient maintenance of the HVAC (heating, ventilation, air conditioning system in the building. Sign and symptoms can be uncomfortable and even disabling, which may include mucus membrane irritation, neurotoxic symptoms, asthma like symptoms, skin complaints, gastrointestinal symptoms and other related symptoms. There are various investigation methods to diagnose sick building syndrome, and on site assessment of the building is extremely useful. Prevention through a proactive air quality monitoring program is far more desirable than dealing with an actual sick building. Indoor air and the sick building symdrome serves as a paradigm of modern occupational and environmental medicine. (Med J Indones 2002; 11:124-31Keywords: indoor air pollution, sick building syndrome, building related illness

  10. Nuclear reactor building

    International Nuclear Information System (INIS)

    Purpose: To prevent seismic vibrations of external buildings from transmitting to the side walls of a reactor container in a tank type FBR reactor building. Constitution: The reactor building is structured such that the base mat for a reactor container chamber and a reactor container is separated from the base mat for the walls of building, and gas-tight material such as silicon rubber is filled in the gap therebetween. With such a constitution, even if the crane-supporting wall vibrates violently upon occurrence of earthqualkes, the seismic vibrations do not transmit toward the reactor container chamber. (Horiuchi, T.)

  11. Grassmannians of classical buildings

    CERN Document Server

    Pankov, Mark

    2010-01-01

    Buildings are combinatorial constructions successfully exploited to study groups of various types. The vertex set of a building can be naturally decomposed into subsets called Grassmannians. The book contains both classical and more recent results on Grassmannians of buildings of classical types. It gives a modern interpretation of some classical results from the geometry of linear groups. The presented methods are applied to some geometric constructions non-related to buildings - Grassmannians of infinite-dimensional vector spaces and the sets of conjugate linear involutions. The book is self

  12. Healthy Buildings '88

    International Nuclear Information System (INIS)

    The Healthy Buildings '88 Conference focuses on the technical solutions and functional requirements contributing to Healthy Buildings for people to live and work in. The main object of the Conference is to give architects, consultants, real-estate owners and manufacturers of building materials recommendations on choice of materials and choice of systems and on how to combine materials and systems. The program includes overview lectures, plenary symposia with invited speakers, workshops, poster presentations and an exhibition of scientific, educational and technical material. One part of the conference is devoted to the problem of radon in residential buildings

  13. Building America Best Practices Series, Volume 10: Retrofit Techniques and Technologies: Air Sealing

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.; Gilbride, Theresa L.; Hefty, Marye G.; Cole, Pamala C.; Williamson, Jennifer L.; Love, Pat M.

    2010-04-12

    This report was prepared by PNNL for the U.S. Department of Energy Building America Program. The report provides information to home owners who want to make their existing homes more energy efficient by sealing leaks in the building envelope (ceiling, walls, and floors) that let in drafts and let conditioned air escape. The report provides descriptions of 19 key areas of the home where air sealing can improve home performance and energy efficiency. The report includes suggestions on how to find a qualified weatherization or home performance contractor, what to expect in a home energy audit, opportune times for performing air sealing, and what safety and health concerns to be aware of. The report describes some basic building science concepts and topics related to air sealing including ventilation, diagnostic tools, and code requirements. The report will be available for free download from the DOE Building America website. It is a suitable consumer education tool for home performance and weatherization contractors to share with customers to describe the process and value of home energy retrofits.

  14. Building environmental assessment schemes: pragmatism to achieve meaningful improvements

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, J; Ling, L. W. [Hong Kong Polytechnic Univ., Hong Kong Special Administrative Region (China)

    1998-11-01

    The objective of the Hong Kong Building Environmental Assessment Method (HK-BEAM) is to minimize the adverse effects of new office premises on the global and local environment and to promote healthy indoor environments within reasonable additional costs. It is intended to encourage clients, designers, contractors, operators, and occupants to become more environmentally aware, and to reduce long-term impact that buildings have on the environment. Preliminary assessment of new offices is carried out during the design process, with follow-ups during construction and upon completion before confirming the overall assessment rating. The assessment method is designed to take into account global issues and use of resources. These include energy consumption, office lighting, heat recovery, air conditioning, electricity consumption, ozone depletion, use of timber, storage for recycling of materials, etc. Local issues mentioned are electricity maximum demand, water conservation and waste water discharge, recycled materials, noise from cooling, noise from building services installation, vehicular and pedestrian access, etc. Indoor issues incorporate non-HVAC services, indoor air quality, hazardous materials, lighting design, daylighting, etc. In general, the HK-BEAM scheme has achieved good credibility within Hong Kong. It has improved the awareness of developers as far as environmental issues are concerned, encouraged better design and operational practices. Nevertheless, to date it has had no significant impact on the building stock overall. 8 refs., 2 tabs.

  15. Kennedy Space Center's NASA/Contractor Team-Centered Total Quality Management Seminar: Results, methods, and lessons learned

    Science.gov (United States)

    Kinlaw, Dennis C.; Eads, Jeannette

    1992-01-01

    It is apparent to everyone associated with the Nation's aeronautics and space programs that the challenge of continuous improvement can be reasonably addressed only if NASA and its contractors act together in a fully integrated and cooperative manner that transcends the traditional boundaries of proprietary interest. It is, however, one thing to assent to the need for such integration and cooperation; it is quite another thing to undertake the hard tasks of turning such a need into action. Whatever else total quality management is, it is fundamentally a team-centered and team-driven process of continuous improvement. The introduction of total quality management at KSC, therefore, has given the Center a special opportunity to translate the need for closer integration and cooperation among all its organizations into specific initiatives. One such initiative that NASA and its contractors have undertaken at KSC is a NASA/Contractor team-centered Total Quality Management Seminar. It is this seminar which is the subject of this paper. The specific purposes of this paper are to describe the following: Background, development, and evolution of Kennedy Space Center's Total Quality Management Seminar; Special characteristics of the seminar; Content of the seminar; Meaning and utility of a team-centered design for TQM training; Results of the seminar; Use that one KSC contractor, EG&G Florida, Inc. has made of the seminar in its Total Quality Management initiative; and Lessons learned.

  16. Knowledge exchange and learning from failures in distributed environments: The role of contractor relationship management and work characteristics

    International Nuclear Information System (INIS)

    Learning from failures is vital for improvement of safety performance, reliability, and resilience in organizations. In order for such learning to take place in distributed environments, knowledge has to be shared among organizational members at different locations and units. This paper reports on a study conducted in the context of drilling and well operations on the Norwegian Continental Shelf, which represents a high-risk distributed organizational environment. The study investigates the relationships between organizations' abilities to learn from failures, knowledge exchange within and between organizational units, quality of contractor relationship management, and work characteristics. The results show that knowledge exchange between units is the most important predictor of perceived ability to learn from failures. Contractor relationship management, leadership involvement, role clarity, and empowerment are also important factors for failure-based learning, both directly and through increased knowledge exchange. The results of the study enhance our understanding of how abilities to learn from failures can be improved in distributed environments where similar work processes take place at different locations and involve employees from several companies. Theoretical contributions and practical implications are discussed. - Highlights: • We investigate factors affecting failure-based learning in distributed environments. • Knowledge exchange between units is the most important predictor. • Contractor relationship management is positively related to knowledge exchange. • Leadership involvement, role clarity, and empowerment are significant variables. • Respondents from an operator firm and eight contractors are included in the study

  17. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Science.gov (United States)

    2010-10-01

    ... Child Labor. 22.1503 Section 22.1503 Federal Acquisition Regulations System FEDERAL ACQUISITION... Acquisition of Products Produced by Forced or Indentured Child Labor 22.1503 Procedures for acquiring end products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child...

  18. 48 CFR 622.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Science.gov (United States)

    2010-10-01

    ... Child Labor. 622.1503 Section 622.1503 Federal Acquisition Regulations System DEPARTMENT OF STATE... Products Produced by Forced or Indentured Child Labor 622.1503 Procedures for acquiring end products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child Labor. (e)...

  19. 41 CFR 109-1.5204 - Review and approval of a designated contractor's personal property management system.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Review and approval of a... property management system. (a) An initial review of a designated contractor's personal property management... needs, and good business practices. If circumstances preclude completion of the initial review...

  20. 77 FR 72905 - Pipeline Safety: Random Drug Testing Rate; Contractor MIS Reporting; and Obtaining DAMIS Sign-In...

    Science.gov (United States)

    2012-12-06

    ... January 19, 2010, PHMSA published an Advisory Bulletin (75 FR 2926) implementing the annual collection of... Pipeline and Hazardous Materials Safety Administration Pipeline Safety: Random Drug Testing Rate... for random drug testing, reminder for operators to report contractor MIS data, and new method...

  1. Alternative methods for evaluation of airtightness of the building envelope; Alternativa metoder foer utvaerdering av byggnadsskalets lufttaethet

    Energy Technology Data Exchange (ETDEWEB)

    Sikander, Eva; Wahlgren, Paula

    2008-07-01

    Airtightness plays an important role when constructing energy efficient, sustainable and healthy buildings. In order to obtain airtight buildings, the airtightness needs to be evaluated during the construction phase. This enables improvements of the airtightness in an easy and cost-efficient way. During the construction phase, it is difficult to quantify the airtightness. However, detecting and sealing air leakages are good measures to improve the airtightness of the building. Several methods to detect air leakages are presented. A methodology to search for air leakages in buildings during construction has been developed, together with contractors and experts, and the methodology has been used at two building sites. The quantifiable airtightness of a building is determined by measuring the airflow that enters or exits the building at a certain pressure difference over the building envelope. In some cases it is not possible to measure air tightness according to standard. Therefore, a number of alternative methods have been evaluated. These methods include: extrapolation of measured data to a range used in standard measurements, using a buildings ventilation system fans to create a pressure difference over the building envelope, measuring the airtightness of a smaller part of the building (apartment, fire compartment or component) and tracer gas measurements

  2. Financing Small Scale Contractors through Mobilization Advance Payments for Improved Performance: The Case of the Tamale Metropolis

    Directory of Open Access Journals (Sweden)

    Debrah Kwame Donkor

    2014-11-01

    Full Text Available The construction industry plays an important role in any economy, and its activities are vital to the achievement of the socio-economic development goals of a nation. In Ghana, the construction and housing industry plays an immeasurable role in the national developmental agenda. What however, appears to be debatable is whether the industry wields the much expected driving force required to pronounce its vital contribution towards accelerated national growth in terms of infrastructural development. This paper assesses the extent to which Mobilization Advance Payment (MAP contribute to the output of small scale contractors in the Tamale metropolis. Thirty (30 construction firms, fifteen (15 consultancy firms and fifteen (15 financial institutions were surveyed, and Chi-Squared (X2 test at α=0.05was run on responses using SPSS. The study revealed that 49% of key stakeholders in the construction industry in the Tamale metropolis see mobilization advance payment from clients as the most accessible and affordable form of construction financing. This was closely followed by Banks/Saving & Loans (regulated financial institution with 43%, and 8% for non-regulated financial institutions. A significantly high number of consultants (60% agreed that mobilization advance payment is the most accessible and affordable form of construction financing. The Chi-Squared (X2 Test on MAP and contractors performance also revealed an X2 statistic of ≈0.711 for a degrees of freedom of 4 which means that MAP arrangements for contractors contribute significantly to their output. Regrettable though, the misappropriation or misuse of such funds by some contractors has resulted in difficulties in accessing mobilization advance payments even by genuine contractors in dire need of working capital. Abandoned projects, delay in project delivery, cost overruns and employment of unqualified personnel among others result from the unavailability of this accessible and affordable

  3. School Building Defect Pattern

    Directory of Open Access Journals (Sweden)

    Mahli M.

    2014-01-01

    Full Text Available In providing a conducive learning environment for the student, the school building must be in good condition. This paper is evaluating the existing condition of primary school building in Sarawak, Malaysia. It focuses on building defects pattern for school building. The primary data collection is from the school building condition survey with involvement of 24 primary schools. The schools have been selected using simple random sampling and stratified sampling (of school age as the variable of selection. The reporting method is based on Condition Survey Protocol (CSP 1 Matrix. Data analysis covers descriptive and inferential statistics. The analysis carried out found that the overall 4,725 defects have been identified. The building defect pattern is mainly on Ground Level of 3,176 defects, the highest number of defects components found on walls (798. 16.2% defects are cracks from 11 common defects and most of all the highest score of defects based on age of the building were the building in the range of 11 to 20 years.

  4. Integrated Building Design

    DEFF Research Database (Denmark)

    Heiselberg, Per

    In the first half of the 20th century, HVAC systems and artificial lighting were developed to meet indoor comfort needs. Before the introduction of mechanical systems, climate - not building style or appearance - was the major determinant of building form. Comfort was achieved through passive mea...

  5. Building with shapes

    CERN Document Server

    Mooney, Carla

    2014-01-01

    There are shapes everywhere you look. You can put shapes together or build with them. What can you build with three circles? In this title, students will explore and understand that certain attributes define what a shape is called. This title will allow students to identify the main purpose of a text, including what the author wants to answer, explain, or describe.

  6. Dancing building prevents collapse

    NARCIS (Netherlands)

    Visscher, R.

    2007-01-01

    In future, anybody caught inside a building during an earthquake need no longer fear the roof collapsing on them. Thanks to the use of composite materials, all the building will do is dance along, riding the waves of the earthquake. At least, according to Professor Ir. Adriaan Beukers of the Aerospa

  7. Heat loss from Buildings

    DEFF Research Database (Denmark)

    Karlsson, Kenneth; Næraa, Rikke

    1997-01-01

    Determination of heat loss coefficients for buildings in Denmark. The coefficient are determined for 15 building groups and 3 year intervals. They are based on the BBR-registre and assumptions of U-values(W/K*m2)and computed in a simple spreed sheet model.The results are used in the REVEILLE...

  8. Building a Better Robot

    Science.gov (United States)

    Navah, Jan

    2012-01-01

    Kids love to build robots, letting their imaginations run wild with thoughts of what they might look like and what they could be programmed to do. Yet when students use cereal boxes and found objects to make robots, often the projects look too similar and tend to fall apart. This alternative allows students to "build" robots in a different way,…

  9. Building a Data Warehouse.

    Science.gov (United States)

    Levine, Elliott

    2002-01-01

    Describes how to build a data warehouse, using the Schools Interoperability Framework (www.sifinfo.org), that supports data-driven decision making and complies with the Freedom of Information Act. Provides several suggestions for building and maintaining a data warehouse. (PKP)

  10. Building Numbers from Primes

    Science.gov (United States)

    Burkhart, Jerry

    2009-01-01

    Prime numbers are often described as the "building blocks" of natural numbers. This article shows how the author and his students took this idea literally by using prime factorizations to build numbers with blocks. In this activity, students explore many concepts of number theory, including the relationship between greatest common factors and…

  11. Body-building

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    正In recent years, more and more people spare no pains to join in the body-building group. People begin to take part in various fitness clubs or fitness centers in their spare time. This shows body-building has become an indispensable part of many people’s life.

  12. Electromagnetically shielded building

    International Nuclear Information System (INIS)

    This invention relates to a building having an electromagnetic shield structure well-suited for application to an information network system utilizing electromagnetic waves, and more particularly to an electromagnetically shielded building for enhancing the electromagnetic shielding performance of an external wall. 6 figs

  13. Filtrations and Buildings

    OpenAIRE

    Cornut, Christophe

    2014-01-01

    We construct and study a scheme theoretical version of the Tits vectorial building, relate it to filtrations on fiber functors, and use them to clarify various constructions pertaining to Bruhat-Tits buildings, for which we also provide a Tannakian description.

  14. Technical Management for Buildings

    CERN Document Server

    Vairo, Antonio

    1999-01-01

    This paper is a presentation of an 'instrument' for the optimization of the functionality and conservation of tertiary buildings. This technique has several different names: Building Automation Systems (BAS), Central Control and Monitoring System (CCMS) in English, and Gestion Technique du Bâtiment' (GTB) or Gestion Technique Centralisée (GTC) in French. With this technique it is possible to manage all the functions of a building, it is a modern instrument that introduces the concept of 'automation' in the operation of buildings using computerized procedures, earlier reserved for industrial processes. The system is structured with different automation levels with a distributed intelligence, each level characterized by a communication system (Fieldbus for the lowest and Ethernet for the highest level). In order to apply the BAS to CERN buildings it is necessary to evaluate the advantages, the CERN requirements and the integration with the several existing control and automation systems.

  15. Energy management systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lush, D.M.

    1979-07-01

    An investigation is made of the range of possibilities available from three types of systems (automatic control devices, building envelope, and the occupants) in buildings. The following subjects are discussed: general (buildings, design and personnel); new buildings (envelope, designers, energy and load calculations, plant design, general design parameters); existing buildings (conservation measures, general energy management, air conditioned buildings, industrial buildings); man and motivation (general, energy management and documentation, maintenance, motivation); automatic energy management systems (thermostatic controls, optimized plant start up, air conditioned and industrial buildings, building automatic systems). (MCW)

  16. Knowledge formalization of intelligent building

    Science.gov (United States)

    Žáček, Martin

    2016-06-01

    This article aim is understanding the basic knowledge about an intelligent building. The notion of the intelligent building can be called any building equipped with computer and communication technology, which can automatically respond to internal or external stimuli. The result of the intelligent building is an automated and foreseeing of activities that enable to reduce operating costs and increase comfort. The best way to use the intelligent building is for a low-energy building, a passive building, or for building with high savings. The output of this article is the formalization of basic knowledge of the intelligent building by RDF graph.

  17. Semantic Bim and GIS Modelling for Energy-Efficient Buildings Integrated in a Healthcare District

    Science.gov (United States)

    Sebastian, R.; Böhms, H. M.; Bonsma, P.; van den Helm, P. W.

    2013-09-01

    The subject of energy-efficient buildings (EeB) is among the most urgent research priorities in the European Union (EU). In order to achieve the broadest impact, innovative approaches to EeB need to resolve challenges at the neighbourhood level, instead of only focusing on improvements of individual buildings. For this purpose, the design phase of new building projects as well as building retrofitting projects is the crucial moment for integrating multi-scale EeB solutions. In EeB design process, clients, architects, technical designers, contractors, and end-users altogether need new methods and tools for designing energy-efficiency buildings integrated in their neighbourhoods. Since the scope of designing covers multiple dimensions, the new design methodology relies on the inter-operability between Building Information Modelling (BIM) and Geospatial Information Systems (GIS). Design for EeB optimisation needs to put attention on the inter-connections between the architectural systems and the MEP/HVAC systems, as well as on the relation of Product Lifecycle Modelling (PLM), Building Management Systems (BMS), BIM and GIS. This paper is descriptive and it presents an actual EU FP7 large-scale collaborative research project titled STREAMER. The research on the inter-operability between BIM and GIS for holistic design of energy-efficient buildings in neighbourhood scale is supported by real case studies of mixed-use healthcare districts. The new design methodology encompasses all scales and all lifecycle phases of the built environment, as well as the whole lifecycle of the information models that comprises: Building Information Model (BIM), Building Assembly Model (BAM), Building Energy Model (BEM), and Building Operation Optimisation Model (BOOM).

  18. Building Sustainability Assessment

    Directory of Open Access Journals (Sweden)

    Heli Koukkari

    2010-07-01

    Full Text Available Although social, economic, and cultural indicators are of substantial importance to the concept of sustainable building, this concept is usually related to environmental characteristics. Any building level assessment method is complex and involves contradictory aspects. Moreover, emphasizing qualitative criteria only increases confusion. R&D and standardization are thus concentrated to transparency and usability of the environmental methods. Other directions of research aim at performance-based design and methods to take regional and cultural aspects into account. In this paper, the perspectives of the sustainability assessment of a whole building are presented, based on a state of the art, feasibility study on performance analysis and the development of an extended life-cycle assessment for buildings. Using various tools, and based on the case studies of building sustainability assessment, environmental indicators were often shown to be of lesser importance than the other, soft ones. The first steps in the development of a building sustainability assessment method for Portuguese residential buildings will be presented and discussed in the end.

  19. Building Software with Gradle

    CERN Document Server

    CERN. Geneva; Studer, Etienne

    2014-01-01

    In this presentation, we will give an overview of the key concepts and main features of Gradle, the innovative build system that has become the de-facto standard in the enterprise. We will cover task declaration and task graph execution, incremental builds, multi-project builds, dependency management, applying plugins, extracting reusable build logic, bootstrapping a build, and using the Gradle daemon. By the end of this talk, you will have a good understanding of what makes Gradle so powerful yet easy to use. You will also understand why companies like Pivotal, LinkedIn, Google, and other giants with complex builds count on Gradle. About the speakers Etienne is leading the Tooling Team at Gradleware. He has been working as a developer, architect, project manager, and CTO over the past 15 years. He has spent most of his time building software products from the ground up and successfully shipping them to happy customers. He had ...

  20. Building-integrated photovoltaics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-01-01

    This is a study of the issues and opportunities for building-integrated PV products, seen primarily from the perspective of the design community. Although some quantitative analysis is included, and limited interviews are used, the essence of the study is qualitative and subjective. It is intended as an aid to policy makers and members of the technical community in planning and setting priorities for further study and product development. It is important to remember that the success of a product in the building market is not only dependent upon its economic value; the diverse group of building owners, managers, regulators, designers, tenants and users must also find it practical, aesthetically appealing and safe. The report is divided into 11 sections. A discussion of technical and planning considerations is followed by illustrative diagrams of different wall and roof assemblies representing a range of possible PV-integration schemes. Following the diagrams, several of these assemblies are then applied to a conceptual test building which is analyzed for PV performance. Finally, a discussion of mechanical/electrical building products incorporating PVs is followed by a brief surveys of cost issues, market potential and code implications. The scope of this report is such that most of the discussion does not go beyond stating the questions. A more detailed analysis will be necessary to establish the true costs and benefits PVs may provide to buildings, taking into account PV power revenue, construction costs, and hidden costs and benefits to building utility and marketability.

  1. Buildings Interoperability Landscape

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Dave [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stephan, Eric G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Corbin, Charles D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Widergren, Steven E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-12-31

    Through its Building Technologies Office (BTO), the United States Department of Energy’s Office of Energy Efficiency and Renewable Energy (DOE-EERE) is sponsoring an effort to advance interoperability for the integration of intelligent buildings equipment and automation systems, understanding the importance of integration frameworks and product ecosystems to this cause. This is important to BTO’s mission to enhance energy efficiency and save energy for economic and environmental purposes. For connected buildings ecosystems of products and services from various manufacturers to flourish, the ICT aspects of the equipment need to integrate and operate simply and reliably. Within the concepts of interoperability lie the specification, development, and certification of equipment with standards-based interfaces that connect and work. Beyond this, a healthy community of stakeholders that contribute to and use interoperability work products must be developed. On May 1, 2014, the DOE convened a technical meeting to take stock of the current state of interoperability of connected equipment and systems in buildings. Several insights from that meeting helped facilitate a draft description of the landscape of interoperability for connected buildings, which focuses mainly on small and medium commercial buildings. This document revises the February 2015 landscape document to address reviewer comments, incorporate important insights from the Buildings Interoperability Vision technical meeting, and capture thoughts from that meeting about the topics to be addressed in a buildings interoperability vision. In particular, greater attention is paid to the state of information modeling in buildings and the great potential for near-term benefits in this area from progress and community alignment.

  2. The corporate brand building

    OpenAIRE

    Wisterová, Veronika

    2011-01-01

    The target of this master's thesis is to follow the process of corporate brand building of the company Starkl zahradník, to analyse it and to suggest possible improvements. The thesis is divided into four main sections. The first section deals with the theoretical aspects of the corporate brand building. The second section observes the process of brand building of the brand Starkl zahradník. The third section deals with the survey that was carried out and analyse its results. This survey was ...

  3. Building Social Web Applications

    CERN Document Server

    Bell, Gavin

    2009-01-01

    Building a web application that attracts and retains regular visitors is tricky enough, but creating a social application that encourages visitors to interact with one another requires careful planning. This book provides practical solutions to the tough questions you'll face when building an effective community site -- one that makes visitors feel like they've found a new home on the Web. If your company is ready to take part in the social web, this book will help you get started. Whether you're creating a new site from scratch or reworking an existing site, Building Social Web Applications

  4. INL Green Building Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Jennifer Dalton

    2005-05-01

    Green buildings, also known as sustainable buildings, resource efficient buildings, and high performance buildings, are structures that minimize the impact on the environment by using less energy and water, reducing solid waste and pollutants, and limiting the depletion of natural resources. As Idaho National Laboratory (INL) becomes the nation’s premier nuclear energy research laboratory, the physical infrastructure will be established to help accomplish the mission. This infrastructure, particularly the buildings, should incorporate green design features in order to be environmentally responsible and reflect an image of progressiveness and innovation to the public and prospective employees. With this in mind, the recommendations described in this strategy are intended to form the INL foundation for green building standards. The recommendations in this strategy are broken down into three levels: Baseline Minimum, Leadership in Energy and Environmental Design (LEED)Certification, and Innovative. Baseline Minimum features should be included in all new occupied buildings no matter what the purpose or size. These features do not require significant research, design, or capital costs and yet they can reduce Operation and Maintenance (O&M) costs and produce more environmentally friendly buildings. LEED Certification features are more aggressive than the Baseline Minimums in that they require documentation, studies, and/or additional funding. Combined with the Baseline Minimums, many of the features in this level will need to be implemented to achieve the goal of LEED certification. LEED Silver certification should be the minimum goal for all new buildings (including office buildings, laboratories, cafeterias, and visitor centers) greater than 25,000 square feet or a total cost of $10 million. Innovative features can also contribute to LEED certification, but are less mainstream than those listed in the previous two levels. These features are identified as areas where

  5. Building for energy conservation

    Energy Technology Data Exchange (ETDEWEB)

    O' Callaghan, P.W.

    1978-01-01

    The need to conserve energy, how energy may be saved, and thermal energy conservation in buildings are discussed in the introductory chapter. Heat gains and losses, fluid flow, convective heat transfer, and radiative heat transfer are covered in chapter 2, fundamentals. Thermal comfort, climate, heat losses from buildings, heat gains to buildings, thermal network analysis, energy thrift, secondary effects, waste heat recovery, and altenative energy sources are subjects covered in chapters 3 to 11. The final chapter, prospectus for the future, covers discussions on areas where energy should be saved, total energy, energy management, energy accounting, and practicing energy conservation. (MCW)

  6. ASSESSING THE IMPACT OF TOTAL QUALITY MANAGEMENT PRACTICES AND QUALITY CULTURE WITH COMPETITIVENESS OF SAUDI CONTRACTORS

    Directory of Open Access Journals (Sweden)

    Faihan Alotaibi

    2013-01-01

    Full Text Available Total quality management practices in construction industries can be described as the processes or that aligns the business performance strategy to the business processes in the hopes of achieving customer satisfaction and product and services quality. Quality culture conditions are strongly linked with project outcomes and hence, initiatives undertaken should be incorporated to the organizational cultural changes. The aim of the study is to determine the impact of total quality management practices, quality culture and their relationship with the competitiveness of Saudi Arabia contractors. A quantitative research design was adopted to collect data and test hypotheses. A cross-sectional survey method was used to conduct this study. The findings of the study will contribute to both theory and practice. Through the present study, the researcher expects the findings to indicate that total quality management practices meaningfully contributed and related to competitiveness and developing cooperative relationship with customers; practices that are related to the achievement of continuous improvement and in turn, continuous improvement affects quality outcomes.

  7. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster dsplays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume II covers papers presented at sessions 5 and 6 on system for the production of synthesis gas, and on system for the production of power. All papers have been processed for inclusion in the Energy Data Base.

  8. DOE contractors' workshop: Cellular and molecular aspects of radiation induced DNA damage and repair

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    For four decades the US Department of Energy and its predecessors have been the lead federal agency in supporting radiation biology research. Over the years emphasis in this program has gradually shifted from dose-effect studies on animals to research on the effects of radiations of various qualities on cells and molecules. Mechanistic studies on the action of radiation at the subcellular level are few in number and there is a need for more research in this area if we are to gain a better understanding of how radiation affects living cells. The intent of this workshop was to bring together DOE contractors and grantees who are investigating the effects of radiation at the cellular and molecular levels. The aims were to foster the exchange of information on research projects and experimental results, promote collaborative research efforts, and obtain an overview of research currently supported by the Health Effects Research Division of the Office of Health and Environmental Research. The latter is needed by the Office for program planning purposes. This report on the workshop which took place in Albuquerque, New Mexico on March 10-11, 1987, includes an overview with future research recommendations, extended abstracts of the plenary presentations, shorter abstracts of each poster presentation, a workshop agenda and the names and addresses of the attendees.

  9. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster displays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume I covers information presented at sessions 1 through 4 on systems for the production of Co-products and industrial fuel gas, environmental projects, and components and materials. Individual papers have been processed for the Energy Data Base.

  10. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  11. DOE contractors' workshop: Cellular and molecular aspects of radiation induced DNA damage and repair

    International Nuclear Information System (INIS)

    For four decades the US Department of Energy and its predecessors have been the lead federal agency in supporting radiation biology research. Over the years emphasis in this program has gradually shifted from dose-effect studies on animals to research on the effects of radiations of various qualities on cells and molecules. Mechanistic studies on the action of radiation at the subcellular level are few in number and there is a need for more research in this area if we are to gain a better understanding of how radiation affects living cells. The intent of this workshop was to bring together DOE contractors and grantees who are investigating the effects of radiation at the cellular and molecular levels. The aims were to foster the exchange of information on research projects and experimental results, promote collaborative research efforts, and obtain an overview of research currently supported by the Health Effects Research Division of the Office of Health and Environmental Research. The latter is needed by the Office for program planning purposes. This report on the workshop which took place in Albuquerque, New Mexico on March 10-11, 1987, includes an overview with future research recommendations, extended abstracts of the plenary presentations, shorter abstracts of each poster presentation, a workshop agenda and the names and addresses of the attendees

  12. Costs and Benefits of ISO9000-based Quality Management Systems to Construction Contractors

    Directory of Open Access Journals (Sweden)

    Thomas Ng

    2012-11-01

    Full Text Available ISO9000-based Quality Management Systems(QMSs have been widely applied by manycontractors with a hope to improve the productquality and hence achieve the desiredobjective of client satisfaction. However,setting up and implementing an ISO9000-based QMS is not without cost. Unless thecontractors can benefit from such system, it isunlikely that the senior management ofcontracting firms will commit to implement anISO9000-based QMS. In this paper, the costsof setting up and implementing an ISO9000-based QMS are assessed through aquestionnaire survey. The results arecompared with the benefits attained by thecontractors. It is found that contractors couldbe benefited from the use of ISO9000-basedQMS both tangibly and intangibly. Based on amore conservative estimation of some tangiblebenefits, a basic operational cost-benefit ratioof one to three was derived from the results ofthe survey. Since the latest version ofISO9000 has been fully implemented for anumber of years, the perception of contractorson the benefits gained after theimplementation of ISO9001:2000 is alsoexamined in this paper.

  13. Final report of the radiological release survey of Building 30B at the Grand Junction Office Facility

    International Nuclear Information System (INIS)

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 30B and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building

  14. Buildings exposed to fire

    International Nuclear Information System (INIS)

    The 24 lectures presented to the colloquium cover the following subject fields: (1) Behaviour of structural components exposed to fire; (2) Behaviour of building materials exposed to fire; (3) Thermal processes; (4) Safety related, theoretical studies. (PW)

  15. Municipal Building Energy Usage

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This data set contains energy use data from 2009-2014 for 139 municipally operated buildings. Metrics include: Site & Source EUI, annual electricity, natural...

  16. Buildings Sector Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hostick, Donna J.; Nicholls, Andrew K.; McDonald, Sean C.; Hollomon, Jonathan B.

    2005-08-01

    A joint NREL, ORNL, and PNNL team conducted market analysis to help inform DOE/EERE's Weatherization and Intergovernmental Program planning and management decisions. This chapter presents the results of the market analysis for the Buildings sector.

  17. Helping clients build credit

    OpenAIRE

    Vikki Frank

    2007-01-01

    Until now people who repaid loans from community groups had not been on credit bureaus’ radar. Now Credit Builders Alliance is partnering with Experian to help clients of community lenders build strong credit histories.

  18. Building Materials in Arctic Climate

    DEFF Research Database (Denmark)

    Jensen, Ole Mejlhede

    2005-01-01

    Building in the artic requires special attention on the appropriateness of building materials. The harsh climate makes execution difficult and sets unusual requirements for the pure material properties. In addition, there is a lack of choice of good, natural building materials in the arctic. This...... results in high transport costs. The building materials situation in Greenland may potentially be improved by intensifying the reuse of building materials or by promoting the local production of building materials....

  19. Building Services Systems

    DEFF Research Database (Denmark)

    Zinzi, Michele; Romeo, Carlo; Thomsen, Kirsten Engelund;

    2015-01-01

    This guideline on Building Services Systems is one of four guidelines produced by the School of the Future project. The other three guidelines cover: Building Construction Elements, Improved Indoor Environmental Quality and Concepts for Zero Emission Schools. This guideline consists of the...... description of 5 main technologies: condensing boilers, heat pumps, ventilation systems, lighting and photovoltaic systems. For each technology chapter there is the same content list: an introduction, a brief technology description, some advantages and disadvantages, market penetration and utilisation, energy...

  20. Plataforma smart building

    OpenAIRE

    Cidrera Lopez, Alain

    2013-01-01

    The overall project is a system (hardware + software) that allows monitoring and control in a building / office different security systems, energy, communications, home automation, PKI's overall business that will increase all the efficiency of the building and the business and ensure the continuity of it. My participation in this Project will mainly focus on the development of hardware components, monitoring and control system (home automation, energy, safety control elements ...) and softwa...

  1. Green buildings pay

    DEFF Research Database (Denmark)

    Naboni, Emanuele; Edwards, Brian

    2012-01-01

    The new edition of ‘Green Buildings Pay’ authored by Brian Edwards and Emanuele Naboni explores the business and professional benefits which derive from architectural design driven by sustainability. With a new sub-title ‘Green Buildings Pay: design, productivity and ecology’ the book argues....... Branding via LEED and BREEAM has taken green ideas to China and other emerging economies. The globalization of sustainability and of architectural practice is an important strand of the new edition....

  2. Building Peaceful Borders

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    China's efforts to build a harmonious world begin with establishing peaceful borders with its neighbors China's recent contribution to the world of international relations is the promotion of "building a harmonious world together," put forward by President Hu Jintao at the 60th anniversary of the UN in September 2005. As the core of the country's peaceful foreign policy in the new era, this approach has been well received and widely discussed in the international community. Meanwhile, Chinese foreign pol...

  3. Building Services Requests Subsystem (BSRS)

    Data.gov (United States)

    Department of Transportation — Lotus Notes workflow application used for the submission, processing, tracking and reporting of building service related requiests. Enables regional office building...

  4. Influence of construction and demolition waste management on the environmental impact of buildings

    International Nuclear Information System (INIS)

    Highlights: ► Environmental impacts of different demolition practices. ► “Top-down” approach to the Life Cycle Analysis methodology. ► Results based on real buildings measurements and demolition contractor activities. ► Not every type of selective demolition brings about environmental benefits. - Abstract: The purpose of this study is to quantify comparable environmental impacts within a Life Cycle Analysis (LCA) perspective, for buildings in which the first (Materials) and last (End of Life) life cycle stages are adjusted to several waste/material management options. Unlike most LCAs, the approach is “top-down” rather than “bottom-up”, which usually involves large amounts of data and the use of specific software applications. This approach is considered appropriate for a limited but expedient LCA designed to compare the environmental impacts of different life cycle options. Present results, based on real buildings measurements and demolition contractor activities, show that shallow, superficial, selective demolition may not result in reduced environmental impacts. Calculations actually show an increase (generally less than 5%) in most impact categories for the Materials and End of Life stages because of extra transportation needs. However, core material separation in demolition operations and its recycling and/or reuse does bring environmental benefits. A reduction of around 77% has been estimated in the climate change impact category, 57% in acidification potential and 81% in the summer smog impact (for the life cycle stages referred).

  5. Building new hospitals: a UK infection control perspective.

    Science.gov (United States)

    Stockley, J M; Constantine, C E; Orr, K E

    2006-03-01

    Infection control input is vital throughout the planning, design and building stages of a new hospital project, and must continue through the commissioning (and decommissioning) process, evaluation and putting the facility into full clinical service. Many hospitals continue to experience problems months or years after occupying the new premises; some of these could have been avoided by infection control involvement earlier in the project. The importance of infection control must be recognized by the chief executive of the hospital trust and project teams overseeing the development. Clinical user groups and contractors must also be made aware of infection control issues. It is vital that good working relationships are built up between the infection control team (ICT) and all these parties. ICTs need the authority to influence the process. This may require their specific recognition by the Private Finance Initiative National Unit, the Department of Health or other relevant authorities. ICTs need training in how to read design plans, how to write effective specifications, and in other areas with which they may be unfamiliar. The importance of documentation and record keeping is paramount. External or independent validation of processes should be available, particularly in commissioning processes. Building design in relation to infection control needs stricter national regulations, allowing ICTs to focus on more local usage issues. Further research is needed to provide evidence regarding the relationship between building design and the prevalence of infection. PMID:16337712

  6. Licensee contractor and vendor inspection status report: Quarterly report, January--March 1996. Volume 20, Number 1

    International Nuclear Information System (INIS)

    A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results of inspections performed by the NRC's Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1996 through March 1996

  7. Proceedings of the advanced research and technology development direct utilization, instrumentation and diagnostics contractors' review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Geiling, D.W. (USDOE Morgantown Energy Technology Center, WV (USA)); Goldberg, P.M. (eds.) (USDOE Pittsburgh Energy Technology Center, PA (USA))

    1990-01-01

    The 1990 Advanced Research and Technology Development (AR TD) Direct Utilization, and Instrumentation and Diagnostics Contractors Review Meeting was held September 16--18, 1990, at the Hyatt at Chatham Center in Pittsburgh, PA. The meeting was sponsored by the US Department of Energy (DOE), Office of Fossil Energy, and the Pittsburgh and Morgantown Energy Technology Centers. Each year the meeting provides a forum for the exchange of information among the DOE AR TD contractors and interested parties. This year's meeting was hosted by the Pittsburgh Energy Technology Center and was attended by 120 individuals from industry, academia, national laboratories, and other governmental agencies. Papers were presented on research addressing coal surface, science, devolatilization and combustion, ash behavior, emission controls for gases particulates, fluid bed combustion and utilization in diesels and turbines. Individual reports are processed separately for the data bases.

  8. An Analysis of the Collusive Game and Governance Strategy between the Supervisor and the Contractor under the Asymmetric Information

    Directory of Open Access Journals (Sweden)

    TaoYan

    2013-01-01

    Full Text Available Project contract is the incomplete contract and the rights and obligations between the parties of the contract cannot be accurately determined because of the inherent characteristics of asymmetric information, incompleteness, the parties' bounded rationality and each party in pursuit of maximizing their own interests. This gives rise to the collusive risk of the project in the process of construction between the supervisor and the contractor. This study firstly takes the supervisor and contractor as each party of the game by using the view of game theory and establishes the game model based on the theory of asymmetric information and then analyzes the effective treatment for both parties' gambling behaviors, finally discuss the governance strategy on the prevention of the collusion between the supervisor and constructor.

  9. Licensee contractor and vendor inspection status report: Quarterly report, January--March 1997. Volume 21, Number 1

    International Nuclear Information System (INIS)

    A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results of inspections performed by the NRC's Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1997 through March 1997

  10. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document and to DOE Order 1300.2A. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information by the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this TSL are those recorded as of July 1, 1996.

  11. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information by the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this technical standards list are those recorded as of May 1, 1999.

  12. Geodesy work provided by the general contractor of the Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    The progress is described of geodesy work during the construction of the Dukovany nuclear power plant. Geodetic documentation was compiled for the construction site and a network of fixed points on the site area was laid out and stabilized. The entire network coincided with the local coordinate system. Experience is described with the detailed laying out of the reactor building. (E.J.)

  13. Design/build/mockup of the Waste Isolation Pilot Plant gas generation experiment glovebox

    International Nuclear Information System (INIS)

    A glovebox was designed, fabricated, and mocked-up for the WIPP Gas Generation Experiments (GGE) being conducted at ANL-W. GGE will determine the gas generation rates from materials in contact handled transuranic waste at likely long term repository temperature and pressure conditions. Since the customer's schedule did not permit time for performing R ampersand D of the support systems, designing the glovebox, and fabricating the glovebox in a serial fashion, a parallel approach was undertaken. As R ampersand D of the sampling system and other support systems was initiated, a specification was written concurrently for contracting a manufacturer to design and build the glovebox and support equipment. The contractor understood that the R ampersand D being performed at ANL-W would add additional functional requirements to the glovebox design. Initially, the contractor had sufficient information to design the glovebox shell. Once the shell design was approved, ANL-W built a full scale mockup of the shell out of plywood and metal framing; support systems were mocked up and resultant information was forwarded to the glovebox contractor to incorporate into the design. This approach resulted in a glovebox being delivered to ANL-W on schedule and within budget

  14. High Level Waste Feed Delivery AZ-101 Batch Transfer to the Private Contractor Transfer and Mixing Process Improvements

    International Nuclear Information System (INIS)

    The primary purpose of this business case is to provide Operations and Maintenance with a detailed transfer process review for the first High Level Waste (HLW) feed delivery to the Privatization Contractor (PC), AZ-101 batch transfer to PC. The Team was chartered to identify improvements that could be implemented in the field. A significant penalty can be invoked for not providing the quality, quantity, or timely delivery of HLW feed to the PC

  15. 美军合同商保障法规综述%Summary of the US Army Contractor Support Statute

    Institute of Scientific and Technical Information of China (English)

    蔡丽影; 贾希胜; 王亚彬; 滕红智

    2011-01-01

    The US army contractor support statute system can be divided into three levels: relative laws passed by Congress; rule of law enacted by President, administration institution, DOD and every army of services; bylaw stipulated by every department or bureau of government, headquarters of the army/navy/air force. On the basis of the analysis of the concrete statutes of the three levels,the main characteristics are concluded as: comprehensive content and concrete regulation; pay attention to core capability; update in time, continue more perfect. And the research gives us three inspires: contractor support is an important supplement to our army; statute system is ultimate guarantee to implementing contractor support; and army is the main body to bring contractor support into effect.%美军合同商保障法规可分为:国会通过的有关法律;总统和行政机构、国防部和各军兵种颁布的法规;政府各部、局以及三军总部制订的规章制度3个层次.通过对美军合同商法规3个层次具体法规内容的分析,将美军合同商保障法规的重要特点总结为:内容全面、规定具体;及时更新、不断完善;注重军队核心能力的维持.并由此得出对实施我军合同商保障的3点启示:合同商是军队建制保障的重要补充;法规制度是实施合同商保障的根本保证;军队是实施合同商保障的主体.

  16. Analysis of top Chinese contractors' developmental tracks and evaluation of their strategic selection of international construction markets

    Institute of Scientific and Technical Information of China (English)

    Wu Weiwei; David A.S.Chew; Li Qiming; Zhong Yuan

    2008-01-01

    The past decade has witnessed a rapid development of the international construction market.This research aims to investigate top Chinese contractors' developmental tracks and evaluate their strategic selection of international construction markets over the period from 2001 to 2006,based on the modified Boston Consulting Group Matrix (BCG).Results from 2001 to 2005 indicate that Asia and Africa,which were "question marks" markets for top Chi-nese contractors( abbreviated as TCCs),have the most potential to become "stars" markets;other question marks mar-kets such as the Middle East and Europe are found not to be of potential;"dogs" markets such as the U.S.,Canada and Latin America should be relinquished progressively unless there is renewed growth opportunity over the next two years.Compared to developmental tracks of top contractors from some advanced countries,TCCs' investment and devel-opment strategy in Africa seems to be sustainable and intensive;TCCs' exit strategy for the Middle East appears deter-mined and swift,while their strategy in Asia seems to be lacking in persistence.Furthermore,the data of 2006 indicates that TCCs improve their performance in Asia and Africa,and Africa has become a "stars" market for TCCs.This re-search sheds important lights and insights into the prevailing process of internationalization of TCCs and provides a stra-tegic direction for their selection of international construction market.What is more,this research is also valuable to other Chinese contractors who are seeking the opportunity to enter the international construction markets.

  17. A study of institutional complexity and contractors' safety management strategies / y Chuanjing Ju (BEng., Msc, Chongqing University)

    OpenAIRE

    Ju, Chuanjing; 鞠傳靜

    2015-01-01

    While prior studies have examined the influence of environmental factors (e.g. regulatory, market, and socio-cultural environment) on construction safety accidents, the explanations offered remain piecemeal and the environmental factors are largely treated as given and immutable. In reality, the external environment is dynamic and continuously evolving. Contractors are subject to regulatory, market and socio-cultural segments of environment simultaneously. However, there has to date been litt...

  18. Building America Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2014-10-01

    In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. Four air-based HVAC distribution systems were assessed:-a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms. The relative ability of each system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

  19. Building Hitler's Europe: Forced Labor in the Danish Construction Business during World War II

    OpenAIRE

    Joachim Lund

    2010-01-01

    This article examines how Danish cement factories and building contractors, in particular F. L. Smidth & Co. A/S and its business partner Højgaard & Schultz A/S, used forced and slave labor in Estonia, the Polish General Government, and Serbia as they worked for the German authorities during the Second World War. The article presents new evidence on the use of forced and slave labor inside the European "New Order" and emphasizes the willingness of the companies to expand and engage in morally...

  20. Building America Case Study: Design Guidance for Passive Vents in New Construction Multifamily Buildings, New York, New York

    Energy Technology Data Exchange (ETDEWEB)

    2016-02-01

    This document addresses the use of passive vents as a source of outdoor air in multifamily buildings. The challenges associated with implementing passive vents and the factors affecting performance are outlined. A comprehensive design methodology and quantified performance metrics are provided. Two hypothetical design examples are provided to illustrate the process. This document is intended to be useful to designers, decision-makers, and contractors implementing passive ventilation strategies. It is also intended to be a resource for those responsible for setting high-performance building program requirements, especially pertaining to ventilation and outdoor air. To ensure good indoor air quality, a dedicated source of outdoor air is an integral part of high-performance buildings. Presently, there is a lack of guidance pertaining to the design and installation of passive vents, resulting in poor system performance. This report details the criteria necessary for designing, constructing, and testing passive vent systems to enable them to provide consistent and reliable levels of ventilation air from outdoors.